RecordWell Data

Packet

Village of Cottage Grove · Dane County · meeting of Oct 19, 2026 · Agenda packets

Open the original document More from Village of Cottage Grove

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

VILLAGE OF COTTAGE GROVE NOTICE OF PUBLIC MEETING Village Board of Trustees Monday, October 19, 2026 6:30 p.m. This meeting will take place as a hybrid meeting both virtually and in person at Village Hall at 221 E. Cottage Grove Road. If you are utilizing Zoom, please join the meeting from your computer, tablet or smartphone by visiting https://us06web.zoom.us/j/81356337106? pwd=VYhCrF56PJ4zvY7mZ9edmQ4qRzwbbL.1. You can also participate via phone by dialing 1 312 626 6799 and use Meeting ID 813 5633 7106#. When asked for your Participant ID, just press #, when asked for the Passcode enter 221.You may also choose to participate by providing public comment prior to the meeting via email to Village Clerk Lisa Kalata: lkalata@villageofcottagegrove.gov . If this is a teleconference, virtual or hybrid meeting, please review the Village of Cottage Grove’s policy. Call To Order Determination Of Quorum And That The Agenda Was Properly Posted. Pledge Of Allegiance PUBLIC APPEARANCES-Public's Opportunity To Speak Discuss The Minutes Of The Village Board Meeting On October 5, 2026 And The Joint Village Board And Town Meeting On October 6, 2026. 10-5-26 VB MINUTES.PDF 10-6-26 JT. VB - TOWN MINUTES.PDF Consider The Minutes Of The Village Board Meeting On October 5, 2026 And The Joint Village Board And Town Meeting On October 6, 2026. Unfinished Business Discuss Phase Agreement For Subdivision Improvements For Kosh Valley, LLC, Aka Juniper Fields. JUNIPER FIELDS PHASE 1 AGREEMENT (CLEAN).PDF JUNIPER FIELDS PHASE 1 AGREEMENT.PDF Consider Phase Agreement For Subdivision Improvements For Kosh Valley, LLC, Aka Juniper Fields. Discuss Appointments To Comprehensive Plan Focus Groups. (Presented By President Kelm-Nelson) FOCUS GROUP APPOINTMENTS COMP PLAN_CKN 10-19-26.PDF Consider Appointments To Comprehensive Plan Focus Groups. New Business Discuss Special Event Permit Application From Cottage Grove Chamber. LETTER TO THE VILLAGE.PDF CG CHAMBER APPLICATION W-COMMENTS.PDF 2026 PARADE ROUTE.JPG Consider Special Event Permit Application From Cottage Grove Chamber. Discuss Ordinance 16-2026 Re: Amending Chapter 12, Ordinance 17-2026, Re: Repealing And Recreating Chapter 163, Ordinance 18-2026 Re: Repealing And Recreating Chapter 312. 16-2026 AMENDING CHAPTER 12 RELATED TO PUBLIC WORKS AND PARKS AND RECREATION COMMITTEES.PDF 17-2026 REPEALING AND RECREATING CHAPTER 163 W-EXHIBIT A.PDF EROSION SEDIMENT AND WATER RUNOFF CONTROL (REDLINE).PDF 18-2026 REPEALING AND RECREATING CHAPTER 312 W-EXHIBIT A.PDF WATER SEWER AND STORMWATER (REDLINE) (002).PDF Consider Ordinance 16-2026 Re: Amending Chapter 12, Ordinance 17-2026, Re: Repealing And Recreating Chapter 163, Ordinance 18-2026 Re: Repealing And Recreating Chapter 312. Reports From Village Boards, Commissions & Committees Plan Commission 10-14-2026 PLAN COMMISSION AGENDA.PDF Discuss An Application From Kendal & Donna Uphoff For Approval Of A ETJ Certified Survey Map To Create One New 2.11 Acre Parcel From Parcel #0711-142- 8070-2 On W. Ridge Road In The Town Of Cottage Grove. CG_VAR_PC_UPHOFF-ETJ-CSM_2026-10-14.PDF CG_UPHOFF-ETJ-CSM_2026-10-07.PDF UPHOFF - RIDGE RD CSM (8-26-26).PDF UPHOFF - RIDGE RD CSM(3-31-26).PDF VILLAGE APP (SIGNED).PDF Consider An Application From Kendal & Donna Uphoff For Approval Of A ETJ Certified Survey Map To Create One New 2.11 Acre Parcel From Parcel #0711- 142-8070-2 On W. Ridge Road In The Town Of Cottage Grove. Discuss An Application From Hydrite Chemical Co. For Approval Of A Site Plan Amendment For The Construction Of A New 2,560 Sq. Ft. Building And Associated Pipe Bridge At The Existing Facility Located At 114 N. Main Street. CG_VAR_PC_HYDRITE-SITE_2026-10-14.PDF CG_HYDRITESITEAMEND_2026-10-06.PDF 2026-09-10-260075000-SEALED CIVIL PLANS.PDF HOT OIL BUILDING_STRAND REVIEW.PDF PLAN REVIEW APPLICATION SIGNED.PDF PROJECT NARRATIVE.PDF ZONING MAP 11X17.PDF 260075000 - SHEET - A1-1A - FIRST FLOOR PLAN - AREA-A.PDF 260075000 - SHEET - A2-0 - EXTERIOR ELEVATIONS.PDF Consider An Application From Hydrite Chemical Co. For Approval Of A Site Plan Amendment For The Construction Of A New 2,560 Sq. Ft. Building And Associated Pipe Bridge At The Existing Facility Located At 114 N. Main Street. Discuss An Application From Johnson Health Tech For Approval Of A Site Plan Amendment For The Expansion Of An Existing Parking Lot At The Former Madison Window Cleaning Building Located At 205 Commerce Parkway. CG_VAR_PC_JHT-SITE_2026-10-14-UPDATED.PDF CG_JHTPARKING_2026-10-06.PDF JOHNSON HEALTH TECH_STRAND REVIEW.PDF 205 COMMERCE FGCC 093026.PDF 261569_CIVIL PLANS_2026-09-28.PDF Consider An Application From Johnson Health Tech For Approval Of A Site Plan Amendment For The Expansion Of An Existing Parking Lot At The Former Madison Window Cleaning Building Located At 205 Commerce Parkway. Budget Review Committee 10-12-2026 BUDGET REVIEW COMMITTEE.PDF Utility Commission 10-14-26 UTILITY AGENDA.PDF Public Works, Properties And Sustainability Committee 9-16-26 PW AGENDA.PDF Discuss An Agreement For Services With GRAEF Regarding The Active Transportation Plan. COTTAGE GROVE_TRAFFIC STUDY_DRAFT PROPOSAL_2026-10.PDF 2026-1012.00 - COTTAGE GROVE ATP DRAFT CONTRACT.PDF Consider An Agreement For Services With GRAEF Regarding The Active Transportation Plan. Ad Hoc Architectural Review Committee 10-14-2026 ARC AGENDA.PDF Deer-Grove EMS Commission 10-15-2026 DGEMS COMMISSION PACKET.PDF Reports From Village Officers Village Attorney i. Legal briefings/status update. Village Administrator VILLAGE ADMINISTRATOR REPORT - 10.19.26.PDF PROJECTS, INITIATIVES, AND DEVELOPMENT TRACKER 10.15.26.PDF Communications And Miscellaneous Business Consider Approval Of Vouchers BILLS LIST.PDF PAY APPLICATION 10.PDF Correspondence Upcoming Community Events Future Agenda Items Discuss And Consider Enter Into Closed Session Regarding Village Administrator Performance Evaluation Process. The Village Of Cottage Grove Village Board Will Enter Into Closed Session Pursuant To Wisconsin State Statute §19.85 (1)(C) Considering Employment, Promotion, Compensation Or Performance Evaluation Data Of Any Public Employee Over Which The Governmental Body Has Jurisdiction Or Exercises Responsibility. Reconvene Into Open Session And Possible Consideration Of Closed Session Items. Adjournment Any item on the agenda is subject to final action. Notice: Persons needing special accommodations should call 608-839-4704 at least 24 hours prior to the meeting. It is possible that members of and possibly a quorum of members of other governmental bodies may attend the above stated meeting to gather information; no action will be taken by any governmental body at the above -stated meeting other than the governmental body specifically referred to above in this notice. Upcoming meetings: 10/21- Library Board 10/22- Parks & Rec 10/26- VB Budget Workshop 10/28- Board of Review 10/29- Emergency Management 10/29- Joint Fire Commission 1. 2. 3. 4. 5. Documents: a. 6. a. Documents: a.i. b. Documents: b.i. 7. a. Documents: a.i. b. Documents: b.i. 8. a. Documents: a.i. Documents: a.i.1. a.ii. Documents: a.ii.1. a.iii. Documents: a.iii.1. b. Documents: c. Documents: d. Documents: d.i. Documents: d.i.1. e. Documents: f. Documents: 9. a. b. Documents: 10. a. Documents: b. c. d. 11. 12. 13. VILLAGE OF COTTAGE GROVE NOTICE OF PUBLIC MEETING Village Board of Trustees Monday, October 19, 2026 6:30 p.m. This meeting will take place as a hybrid meeting both virtually and in person at Village Hall at 221 E. Cottage Grove Road. If you are utilizing Zoom, please join the meeting from your computer, tablet or smartphone by visiting https://us06web.zoom.us/j/81356337106? pwd=VYhCrF56PJ4zvY7mZ9edmQ4qRzwbbL.1. You can also participate via phone by dialing 1 312 626 6799 and use Meeting ID 813 5633 7106#. When asked for your Participant ID, just press #, when asked for the Passcode enter 221.You may also choose to participate by providing public comment prior to the meeting via email to Village Clerk Lisa Kalata: lkalata@villageofcottagegrove.gov . If this is a teleconference, virtual or hybrid meeting, please review the Village of Cottage Grove’s policy. Call To Order Determination Of Quorum And That The Agenda Was Properly Posted. Pledge Of Allegiance PUBLIC APPEARANCES-Public's Opportunity To Speak Discuss The Minutes Of The Village Board Meeting On October 5, 2026 And The Joint Village Board And Town Meeting On October 6, 2026. 10-5-26 VB MINUTES.PDF 10-6-26 JT. VB - TOWN MINUTES.PDF Consider The Minutes Of The Village Board Meeting On October 5, 2026 And The Joint Village Board And Town Meeting On October 6, 2026. Unfinished Business Discuss Phase Agreement For Subdivision Improvements For Kosh Valley, LLC, Aka Juniper Fields. JUNIPER FIELDS PHASE 1 AGREEMENT (CLEAN).PDF JUNIPER FIELDS PHASE 1 AGREEMENT.PDF Consider Phase Agreement For Subdivision Improvements For Kosh Valley, LLC, Aka Juniper Fields. Discuss Appointments To Comprehensive Plan Focus Groups. (Presented By President Kelm-Nelson) FOCUS GROUP APPOINTMENTS COMP PLAN_CKN 10-19-26.PDF Consider Appointments To Comprehensive Plan Focus Groups. New Business Discuss Special Event Permit Application From Cottage Grove Chamber. LETTER TO THE VILLAGE.PDF CG CHAMBER APPLICATION W-COMMENTS.PDF 2026 PARADE ROUTE.JPG Consider Special Event Permit Application From Cottage Grove Chamber. Discuss Ordinance 16-2026 Re: Amending Chapter 12, Ordinance 17-2026, Re: Repealing And Recreating Chapter 163, Ordinance 18-2026 Re: Repealing And Recreating Chapter 312. 16-2026 AMENDING CHAPTER 12 RELATED TO PUBLIC WORKS AND PARKS AND RECREATION COMMITTEES.PDF 17-2026 REPEALING AND RECREATING CHAPTER 163 W-EXHIBIT A.PDF EROSION SEDIMENT AND WATER RUNOFF CONTROL (REDLINE).PDF 18-2026 REPEALING AND RECREATING CHAPTER 312 W-EXHIBIT A.PDF WATER SEWER AND STORMWATER (REDLINE) (002).PDF Consider Ordinance 16-2026 Re: Amending Chapter 12, Ordinance 17-2026, Re: Repealing And Recreating Chapter 163, Ordinance 18-2026 Re: Repealing And Recreating Chapter 312. Reports From Village Boards, Commissions & Committees Plan Commission 10-14-2026 PLAN COMMISSION AGENDA.PDF Discuss An Application From Kendal & Donna Uphoff For Approval Of A ETJ Certified Survey Map To Create One New 2.11 Acre Parcel From Parcel #0711-142- 8070-2 On W. Ridge Road In The Town Of Cottage Grove. CG_VAR_PC_UPHOFF-ETJ-CSM_2026-10-14.PDF CG_UPHOFF-ETJ-CSM_2026-10-07.PDF UPHOFF - RIDGE RD CSM (8-26-26).PDF UPHOFF - RIDGE RD CSM(3-31-26).PDF VILLAGE APP (SIGNED).PDF Consider An Application From Kendal & Donna Uphoff For Approval Of A ETJ Certified Survey Map To Create One New 2.11 Acre Parcel From Parcel #0711- 142-8070-2 On W. Ridge Road In The Town Of Cottage Grove. Discuss An Application From Hydrite Chemical Co. For Approval Of A Site Plan Amendment For The Construction Of A New 2,560 Sq. Ft. Building And Associated Pipe Bridge At The Existing Facility Located At 114 N. Main Street. CG_VAR_PC_HYDRITE-SITE_2026-10-14.PDF CG_HYDRITESITEAMEND_2026-10-06.PDF 2026-09-10-260075000-SEALED CIVIL PLANS.PDF HOT OIL BUILDING_STRAND REVIEW.PDF PLAN REVIEW APPLICATION SIGNED.PDF PROJECT NARRATIVE.PDF ZONING MAP 11X17.PDF 260075000 - SHEET - A1-1A - FIRST FLOOR PLAN - AREA-A.PDF 260075000 - SHEET - A2-0 - EXTERIOR ELEVATIONS.PDF Consider An Application From Hydrite Chemical Co. For Approval Of A Site Plan Amendment For The Construction Of A New 2,560 Sq. Ft. Building And Associated Pipe Bridge At The Existing Facility Located At 114 N. Main Street. Discuss An Application From Johnson Health Tech For Approval Of A Site Plan Amendment For The Expansion Of An Existing Parking Lot At The Former Madison Window Cleaning Building Located At 205 Commerce Parkway. CG_VAR_PC_JHT-SITE_2026-10-14-UPDATED.PDF CG_JHTPARKING_2026-10-06.PDF JOHNSON HEALTH TECH_STRAND REVIEW.PDF 205 COMMERCE FGCC 093026.PDF 261569_CIVIL PLANS_2026-09-28.PDF Consider An Application From Johnson Health Tech For Approval Of A Site Plan Amendment For The Expansion Of An Existing Parking Lot At The Former Madison Window Cleaning Building Located At 205 Commerce Parkway. Budget Review Committee 10-12-2026 BUDGET REVIEW COMMITTEE.PDF Utility Commission 10-14-26 UTILITY AGENDA.PDF Public Works, Properties And Sustainability Committee 9-16-26 PW AGENDA.PDF Discuss An Agreement For Services With GRAEF Regarding The Active Transportation Plan. COTTAGE GROVE_TRAFFIC STUDY_DRAFT PROPOSAL_2026-10.PDF 2026-1012.00 - COTTAGE GROVE ATP DRAFT CONTRACT.PDF Consider An Agreement For Services With GRAEF Regarding The Active Transportation Plan. Ad Hoc Architectural Review Committee 10-14-2026 ARC AGENDA.PDF Deer-Grove EMS Commission 10-15-2026 DGEMS COMMISSION PACKET.PDF Reports From Village Officers Village Attorney i. Legal briefings/status update. Village Administrator VILLAGE ADMINISTRATOR REPORT - 10.19.26.PDF PROJECTS, INITIATIVES, AND DEVELOPMENT TRACKER 10.15.26.PDF Communications And Miscellaneous Business Consider Approval Of Vouchers BILLS LIST.PDF PAY APPLICATION 10.PDF Correspondence Upcoming Community Events Future Agenda Items Discuss And Consider Enter Into Closed Session Regarding Village Administrator Performance Evaluation Process. The Village Of Cottage Grove Village Board Will Enter Into Closed Session Pursuant To Wisconsin State Statute §19.85 (1)(C) Considering Employment, Promotion, Compensation Or Performance Evaluation Data Of Any Public Employee Over Which The Governmental Body Has Jurisdiction Or Exercises Responsibility. Reconvene Into Open Session And Possible Consideration Of Closed Session Items. Adjournment Any item on the agenda is subject to final action. Notice: Persons needing special accommodations should call 608-839-4704 at least 24 hours prior to the meeting. It is possible that members of and possibly a quorum of members of other governmental bodies may attend the above stated meeting to gather information; no action will be taken by any governmental body at the above -stated meeting other than the governmental body specifically referred to above in this notice. Upcoming meetings: 10/21- Library Board 10/22- Parks & Rec 10/26- VB Budget Workshop 10/28- Board of Review 10/29- Emergency Management 10/29- Joint Fire Commission 1. 2. 3. 4. 5. Documents: a. 6. a. Documents: a.i. b. Documents: b.i. 7. a. Documents: a.i. b. Documents: b.i. 8. a. Documents: a.i. Documents: a.i.1. a.ii. Documents: a.ii.1. a.iii. Documents: a.iii.1. b. Documents: c. Documents: d. Documents: d.i. Documents: d.i.1. e. Documents: f. Documents: 9. a. b. Documents: 10. a. Documents: b. c. d. 11. 12. 13. VILLAGE OF COTTAGE GROVE NOTICE OF PUBLIC MEETING Village Board of Trustees Monday, October 19, 2026 6:30 p.m. This meeting will take place as a hybrid meeting both virtually and in person at Village Hall at 221 E. Cottage Grove Road. If you are utilizing Zoom, please join the meeting from your computer, tablet or smartphone by visiting https://us06web.zoom.us/j/81356337106? pwd=VYhCrF56PJ4zvY7mZ9edmQ4qRzwbbL.1. You can also participate via phone by dialing 1 312 626 6799 and use Meeting ID 813 5633 7106#. When asked for your Participant ID, just press #, when asked for the Passcode enter 221.You may also choose to participate by providing public comment prior to the meeting via email to Village Clerk Lisa Kalata: lkalata@villageofcottagegrove.gov . If this is a teleconference, virtual or hybrid meeting, please review the Village of Cottage Grove’s policy. Call To Order Determination Of Quorum And That The Agenda Was Properly Posted. Pledge Of Allegiance PUBLIC APPEARANCES-Public's Opportunity To Speak Discuss The Minutes Of The Village Board Meeting On October 5, 2026 And The Joint Village Board And Town Meeting On October 6, 2026. 10-5-26 VB MINUTES.PDF 10-6-26 JT. VB - TOWN MINUTES.PDF Consider The Minutes Of The Village Board Meeting On October 5, 2026 And The Joint Village Board And Town Meeting On October 6, 2026. Unfinished Business Discuss Phase Agreement For Subdivision Improvements For Kosh Valley, LLC, Aka Juniper Fields. JUNIPER FIELDS PHASE 1 AGREEMENT (CLEAN).PDF JUNIPER FIELDS PHASE 1 AGREEMENT.PDF Consider Phase Agreement For Subdivision Improvements For Kosh Valley, LLC, Aka Juniper Fields. Discuss Appointments To Comprehensive Plan Focus Groups. (Presented By President Kelm-Nelson) FOCUS GROUP APPOINTMENTS COMP PLAN_CKN 10-19-26.PDF Consider Appointments To Comprehensive Plan Focus Groups. New Business Discuss Special Event Permit Application From Cottage Grove Chamber. LETTER TO THE VILLAGE.PDF CG CHAMBER APPLICATION W-COMMENTS.PDF 2026 PARADE ROUTE.JPG Consider Special Event Permit Application From Cottage Grove Chamber. Discuss Ordinance 16-2026 Re: Amending Chapter 12, Ordinance 17-2026, Re: Repealing And Recreating Chapter 163, Ordinance 18-2026 Re: Repealing And Recreating Chapter 312. 16-2026 AMENDING CHAPTER 12 RELATED TO PUBLIC WORKS AND PARKS AND RECREATION COMMITTEES.PDF 17-2026 REPEALING AND RECREATING CHAPTER 163 W-EXHIBIT A.PDF EROSION SEDIMENT AND WATER RUNOFF CONTROL (REDLINE).PDF 18-2026 REPEALING AND RECREATING CHAPTER 312 W-EXHIBIT A.PDF WATER SEWER AND STORMWATER (REDLINE) (002).PDF Consider Ordinance 16-2026 Re: Amending Chapter 12, Ordinance 17-2026, Re: Repealing And Recreating Chapter 163, Ordinance 18-2026 Re: Repealing And Recreating Chapter 312. Reports From Village Boards, Commissions & Committees Plan Commission 10-14-2026 PLAN COMMISSION AGENDA.PDF Discuss An Application From Kendal & Donna Uphoff For Approval Of A ETJ Certified Survey Map To Create One New 2.11 Acre Parcel From Parcel #0711-142- 8070-2 On W. Ridge Road In The Town Of Cottage Grove. CG_VAR_PC_UPHOFF-ETJ-CSM_2026-10-14.PDF CG_UPHOFF-ETJ-CSM_2026-10-07.PDF UPHOFF - RIDGE RD CSM (8-26-26).PDF UPHOFF - RIDGE RD CSM(3-31-26).PDF VILLAGE APP (SIGNED).PDF Consider An Application From Kendal & Donna Uphoff For Approval Of A ETJ Certified Survey Map To Create One New 2.11 Acre Parcel From Parcel #0711- 142-8070-2 On W. Ridge Road In The Town Of Cottage Grove. Discuss An Application From Hydrite Chemical Co. For Approval Of A Site Plan Amendment For The Construction Of A New 2,560 Sq. Ft. Building And Associated Pipe Bridge At The Existing Facility Located At 114 N. Main Street. CG_VAR_PC_HYDRITE-SITE_2026-10-14.PDF CG_HYDRITESITEAMEND_2026-10-06.PDF 2026-09-10-260075000-SEALED CIVIL PLANS.PDF HOT OIL BUILDING_STRAND REVIEW.PDF PLAN REVIEW APPLICATION SIGNED.PDF PROJECT NARRATIVE.PDF ZONING MAP 11X17.PDF 260075000 - SHEET - A1-1A - FIRST FLOOR PLAN - AREA-A.PDF 260075000 - SHEET - A2-0 - EXTERIOR ELEVATIONS.PDF Consider An Application From Hydrite Chemical Co. For Approval Of A Site Plan Amendment For The Construction Of A New 2,560 Sq. Ft. Building And Associated Pipe Bridge At The Existing Facility Located At 114 N. Main Street. Discuss An Application From Johnson Health Tech For Approval Of A Site Plan Amendment For The Expansion Of An Existing Parking Lot At The Former Madison Window Cleaning Building Located At 205 Commerce Parkway. CG_VAR_PC_JHT-SITE_2026-10-14-UPDATED.PDF CG_JHTPARKING_2026-10-06.PDF JOHNSON HEALTH TECH_STRAND REVIEW.PDF 205 COMMERCE FGCC 093026.PDF 261569_CIVIL PLANS_2026-09-28.PDF Consider An Application From Johnson Health Tech For Approval Of A Site Plan Amendment For The Expansion Of An Existing Parking Lot At The Former Madison Window Cleaning Building Located At 205 Commerce Parkway. Budget Review Committee 10-12-2026 BUDGET REVIEW COMMITTEE.PDF Utility Commission 10-14-26 UTILITY AGENDA.PDF Public Works, Properties And Sustainability Committee 9-16-26 PW AGENDA.PDF Discuss An Agreement For Services With GRAEF Regarding The Active Transportation Plan. COTTAGE GROVE_TRAFFIC STUDY_DRAFT PROPOSAL_2026-10.PDF 2026-1012.00 - COTTAGE GROVE ATP DRAFT CONTRACT.PDF Consider An Agreement For Services With GRAEF Regarding The Active Transportation Plan. Ad Hoc Architectural Review Committee 10-14-2026 ARC AGENDA.PDF Deer-Grove EMS Commission 10-15-2026 DGEMS COMMISSION PACKET.PDF Reports From Village Officers Village Attorney i. Legal briefings/status update. Village Administrator VILLAGE ADMINISTRATOR REPORT - 10.19.26.PDF PROJECTS, INITIATIVES, AND DEVELOPMENT TRACKER 10.15.26.PDF Communications And Miscellaneous Business Consider Approval Of Vouchers BILLS LIST.PDF PAY APPLICATION 10.PDF Correspondence Upcoming Community Events Future Agenda Items Discuss And Consider Enter Into Closed Session Regarding Village Administrator Performance Evaluation Process. The Village Of Cottage Grove Village Board Will Enter Into Closed Session Pursuant To Wisconsin State Statute §19.85 (1)(C) Considering Employment, Promotion, Compensation Or Performance Evaluation Data Of Any Public Employee Over Which The Governmental Body Has Jurisdiction Or Exercises Responsibility. Reconvene Into Open Session And Possible Consideration Of Closed Session Items. Adjournment Any item on the agenda is subject to final action. Notice: Persons needing special accommodations should call 608-839-4704 at least 24 hours prior to the meeting. It is possible that members of and possibly a quorum of members of other governmental bodies may attend the above stated meeting to gather information; no action will be taken by any governmental body at the above -stated meeting other than the governmental body specifically referred to above in this notice. Upcoming meetings: 10/21- Library Board 10/22- Parks & Rec 10/26- VB Budget Workshop 10/28- Board of Review 10/29- Emergency Management 10/29- Joint Fire Commission 1. 2. 3. 4. 5. Documents: a. 6. a. Documents: a.i. b. Documents: b.i. 7. a. Documents: a.i. b. Documents: b.i. 8. a. Documents: a.i. Documents: a.i.1. a.ii. Documents: a.ii.1. a.iii. Documents: a.iii.1. b. Documents: c. Documents: d. Documents: d.i. Documents: d.i.1. e. Documents: f. Documents: 9. a. b. Documents: 10. a. Documents: b. c. d. 11. 12. 13. VILLAGE OF COTTAGE GROVE NOTICE OF PUBLIC MEETING Village Board of Trustees Monday, October 19, 2026 6:30 p.m. This meeting will take place as a hybrid meeting both virtually and in person at Village Hall at 221 E. Cottage Grove Road. If you are utilizing Zoom, please join the meeting from your computer, tablet or smartphone by visiting https://us06web.zoom.us/j/81356337106? pwd=VYhCrF56PJ4zvY7mZ9edmQ4qRzwbbL.1. You can also participate via phone by dialing 1 312 626 6799 and use Meeting ID 813 5633 7106#. When asked for your Participant ID, just press #, when asked for the Passcode enter 221.You may also choose to participate by providing public comment prior to the meeting via email to Village Clerk Lisa Kalata: lkalata@villageofcottagegrove.gov . If this is a teleconference, virtual or hybrid meeting, please review the Village of Cottage Grove’s policy. Call To Order Determination Of Quorum And That The Agenda Was Properly Posted. Pledge Of Allegiance PUBLIC APPEARANCES-Public's Opportunity To Speak Discuss The Minutes Of The Village Board Meeting On October 5, 2026 And The Joint Village Board And Town Meeting On October 6, 2026. 10-5-26 VB MINUTES.PDF 10-6-26 JT. VB - TOWN MINUTES.PDF Consider The Minutes Of The Village Board Meeting On October 5, 2026 And The Joint Village Board And Town Meeting On October 6, 2026. Unfinished Business Discuss Phase Agreement For Subdivision Improvements For Kosh Valley, LLC, Aka Juniper Fields. JUNIPER FIELDS PHASE 1 AGREEMENT (CLEAN).PDF JUNIPER FIELDS PHASE 1 AGREEMENT.PDF Consider Phase Agreement For Subdivision Improvements For Kosh Valley, LLC, Aka Juniper Fields. Discuss Appointments To Comprehensive Plan Focus Groups. (Presented By President Kelm-Nelson) FOCUS GROUP APPOINTMENTS COMP PLAN_CKN 10-19-26.PDF Consider Appointments To Comprehensive Plan Focus Groups. New Business Discuss Special Event Permit Application From Cottage Grove Chamber. LETTER TO THE VILLAGE.PDF CG CHAMBER APPLICATION W-COMMENTS.PDF 2026 PARADE ROUTE.JPG Consider Special Event Permit Application From Cottage Grove Chamber. Discuss Ordinance 16-2026 Re: Amending Chapter 12, Ordinance 17-2026, Re: Repealing And Recreating Chapter 163, Ordinance 18-2026 Re: Repealing And Recreating Chapter 312. 16-2026 AMENDING CHAPTER 12 RELATED TO PUBLIC WORKS AND PARKS AND RECREATION COMMITTEES.PDF 17-2026 REPEALING AND RECREATING CHAPTER 163 W-EXHIBIT A.PDF EROSION SEDIMENT AND WATER RUNOFF CONTROL (REDLINE).PDF 18-2026 REPEALING AND RECREATING CHAPTER 312 W-EXHIBIT A.PDF WATER SEWER AND STORMWATER (REDLINE) (002).PDF Consider Ordinance 16-2026 Re: Amending Chapter 12, Ordinance 17-2026, Re: Repealing And Recreating Chapter 163, Ordinance 18-2026 Re: Repealing And Recreating Chapter 312. Reports From Village Boards, Commissions & Committees Plan Commission 10-14-2026 PLAN COMMISSION AGENDA.PDF Discuss An Application From Kendal & Donna Uphoff For Approval Of A ETJ Certified Survey Map To Create One New 2.11 Acre Parcel From Parcel #0711-142- 8070-2 On W. Ridge Road In The Town Of Cottage Grove. CG_VAR_PC_UPHOFF-ETJ-CSM_2026-10-14.PDF CG_UPHOFF-ETJ-CSM_2026-10-07.PDF UPHOFF - RIDGE RD CSM (8-26-26).PDF UPHOFF - RIDGE RD CSM(3-31-26).PDF VILLAGE APP (SIGNED).PDF Consider An Application From Kendal & Donna Uphoff For Approval Of A ETJ Certified Survey Map To Create One New 2.11 Acre Parcel From Parcel #0711- 142-8070-2 On W. Ridge Road In The Town Of Cottage Grove. Discuss An Application From Hydrite Chemical Co. For Approval Of A Site Plan Amendment For The Construction Of A New 2,560 Sq. Ft. Building And Associated Pipe Bridge At The Existing Facility Located At 114 N. Main Street. CG_VAR_PC_HYDRITE-SITE_2026-10-14.PDF CG_HYDRITESITEAMEND_2026-10-06.PDF 2026-09-10-260075000-SEALED CIVIL PLANS.PDF HOT OIL BUILDING_STRAND REVIEW.PDF PLAN REVIEW APPLICATION SIGNED.PDF PROJECT NARRATIVE.PDF ZONING MAP 11X17.PDF 260075000 - SHEET - A1-1A - FIRST FLOOR PLAN - AREA-A.PDF 260075000 - SHEET - A2-0 - EXTERIOR ELEVATIONS.PDF Consider An Application From Hydrite Chemical Co. For Approval Of A Site Plan Amendment For The Construction Of A New 2,560 Sq. Ft. Building And Associated Pipe Bridge At The Existing Facility Located At 114 N. Main Street. Discuss An Application From Johnson Health Tech For Approval Of A Site Plan Amendment For The Expansion Of An Existing Parking Lot At The Former Madison Window Cleaning Building Located At 205 Commerce Parkway. CG_VAR_PC_JHT-SITE_2026-10-14-UPDATED.PDF CG_JHTPARKING_2026-10-06.PDF JOHNSON HEALTH TECH_STRAND REVIEW.PDF 205 COMMERCE FGCC 093026.PDF 261569_CIVIL PLANS_2026-09-28.PDF Consider An Application From Johnson Health Tech For Approval Of A Site Plan Amendment For The Expansion Of An Existing Parking Lot At The Former Madison Window Cleaning Building Located At 205 Commerce Parkway. Budget Review Committee 10-12-2026 BUDGET REVIEW COMMITTEE.PDF Utility Commission 10-14-26 UTILITY AGENDA.PDF Public Works, Properties And Sustainability Committee 9-16-26 PW AGENDA.PDF Discuss An Agreement For Services With GRAEF Regarding The Active Transportation Plan. COTTAGE GROVE_TRAFFIC STUDY_DRAFT PROPOSAL_2026-10.PDF 2026-1012.00 - COTTAGE GROVE ATP DRAFT CONTRACT.PDF Consider An Agreement For Services With GRAEF Regarding The Active Transportation Plan. Ad Hoc Architectural Review Committee 10-14-2026 ARC AGENDA.PDF Deer-Grove EMS Commission 10-15-2026 DGEMS COMMISSION PACKET.PDF Reports From Village Officers Village Attorney i. Legal briefings/status update. Village Administrator VILLAGE ADMINISTRATOR REPORT - 10.19.26.PDF PROJECTS, INITIATIVES, AND DEVELOPMENT TRACKER 10.15.26.PDF Communications And Miscellaneous Business Consider Approval Of Vouchers BILLS LIST.PDF PAY APPLICATION 10.PDF Correspondence Upcoming Community Events Future Agenda Items Discuss And Consider Enter Into Closed Session Regarding Village Administrator Performance Evaluation Process. The Village Of Cottage Grove Village Board Will Enter Into Closed Session Pursuant To Wisconsin State Statute §19.85 (1)(C) Considering Employment, Promotion, Compensation Or Performance Evaluation Data Of Any Public Employee Over Which The Governmental Body Has Jurisdiction Or Exercises Responsibility. Reconvene Into Open Session And Possible Consideration Of Closed Session Items. Adjournment Any item on the agenda is subject to final action. Notice: Persons needing special accommodations should call 608-839-4704 at least 24 hours prior to the meeting. It is possible that members of and possibly a quorum of members of other governmental bodies may attend the above stated meeting to gather information; no action will be taken by any governmental body at the above -stated meeting other than the governmental body specifically referred to above in this notice. Upcoming meetings: 10/21- Library Board 10/22- Parks & Rec 10/26- VB Budget Workshop 10/28- Board of Review 10/29- Emergency Management 10/29- Joint Fire Commission 1. 2. 3. 4. 5. Documents: a. 6. a. Documents: a.i. b. Documents: b.i. 7. a. Documents: a.i. b. Documents: b.i. 8. a. Documents: a.i. Documents: a.i.1. a.ii. Documents: a.ii.1. a.iii. Documents: a.iii.1. b. Documents: c. Documents: d. Documents: d.i. Documents: d.i.1. e. Documents: f. Documents: 9. a. b. Documents: 10. a. Documents: b. c. d. 11. 12. 13. VILLAGE OF COTTAGE GROVE NOTICE OF PUBLIC MEETING Village Board of Trustees Monday, October 19, 2026 6:30 p.m. This meeting will take place as a hybrid meeting both virtually and in person at Village Hall at 221 E. Cottage Grove Road. If you are utilizing Zoom, please join the meeting from your computer, tablet or smartphone by visiting https://us06web.zoom.us/j/81356337106? pwd=VYhCrF56PJ4zvY7mZ9edmQ4qRzwbbL.1. You can also participate via phone by dialing 1 312 626 6799 and use Meeting ID 813 5633 7106#. When asked for your Participant ID, just press #, when asked for the Passcode enter 221.You may also choose to participate by providing public comment prior to the meeting via email to Village Clerk Lisa Kalata: lkalata@villageofcottagegrove.gov . If this is a teleconference, virtual or hybrid meeting, please review the Village of Cottage Grove’s policy. Call To Order Determination Of Quorum And That The Agenda Was Properly Posted. Pledge Of Allegiance PUBLIC APPEARANCES-Public's Opportunity To Speak Discuss The Minutes Of The Village Board Meeting On October 5, 2026 And The Joint Village Board And Town Meeting On October 6, 2026. 10-5-26 VB MINUTES.PDF 10-6-26 JT. VB - TOWN MINUTES.PDF Consider The Minutes Of The Village Board Meeting On October 5, 2026 And The Joint Village Board And Town Meeting On October 6, 2026. Unfinished Business Discuss Phase Agreement For Subdivision Improvements For Kosh Valley, LLC, Aka Juniper Fields. JUNIPER FIELDS PHASE 1 AGREEMENT (CLEAN).PDF JUNIPER FIELDS PHASE 1 AGREEMENT.PDF Consider Phase Agreement For Subdivision Improvements For Kosh Valley, LLC, Aka Juniper Fields. Discuss Appointments To Comprehensive Plan Focus Groups. (Presented By President Kelm-Nelson) FOCUS GROUP APPOINTMENTS COMP PLAN_CKN 10-19-26.PDF Consider Appointments To Comprehensive Plan Focus Groups. New Business Discuss Special Event Permit Application From Cottage Grove Chamber. LETTER TO THE VILLAGE.PDF CG CHAMBER APPLICATION W-COMMENTS.PDF 2026 PARADE ROUTE.JPG Consider Special Event Permit Application From Cottage Grove Chamber. Discuss Ordinance 16-2026 Re: Amending Chapter 12, Ordinance 17-2026, Re: Repealing And Recreating Chapter 163, Ordinance 18-2026 Re: Repealing And Recreating Chapter 312. 16-2026 AMENDING CHAPTER 12 RELATED TO PUBLIC WORKS AND PARKS AND RECREATION COMMITTEES.PDF 17-2026 REPEALING AND RECREATING CHAPTER 163 W-EXHIBIT A.PDF EROSION SEDIMENT AND WATER RUNOFF CONTROL (REDLINE).PDF 18-2026 REPEALING AND RECREATING CHAPTER 312 W-EXHIBIT A.PDF WATER SEWER AND STORMWATER (REDLINE) (002).PDF Consider Ordinance 16-2026 Re: Amending Chapter 12, Ordinance 17-2026, Re: Repealing And Recreating Chapter 163, Ordinance 18-2026 Re: Repealing And Recreating Chapter 312. Reports From Village Boards, Commissions & Committees Plan Commission 10-14-2026 PLAN COMMISSION AGENDA.PDF Discuss An Application From Kendal & Donna Uphoff For Approval Of A ETJ Certified Survey Map To Create One New 2.11 Acre Parcel From Parcel #0711-142- 8070-2 On W. Ridge Road In The Town Of Cottage Grove. CG_VAR_PC_UPHOFF-ETJ-CSM_2026-10-14.PDF CG_UPHOFF-ETJ-CSM_2026-10-07.PDF UPHOFF - RIDGE RD CSM (8-26-26).PDF UPHOFF - RIDGE RD CSM(3-31-26).PDF VILLAGE APP (SIGNED).PDF Consider An Application From Kendal & Donna Uphoff For Approval Of A ETJ Certified Survey Map To Create One New 2.11 Acre Parcel From Parcel #0711- 142-8070-2 On W. Ridge Road In The Town Of Cottage Grove. Discuss An Application From Hydrite Chemical Co. For Approval Of A Site Plan Amendment For The Construction Of A New 2,560 Sq. Ft. Building And Associated Pipe Bridge At The Existing Facility Located At 114 N. Main Street. CG_VAR_PC_HYDRITE-SITE_2026-10-14.PDF CG_HYDRITESITEAMEND_2026-10-06.PDF 2026-09-10-260075000-SEALED CIVIL PLANS.PDF HOT OIL BUILDING_STRAND REVIEW.PDF PLAN REVIEW APPLICATION SIGNED.PDF PROJECT NARRATIVE.PDF ZONING MAP 11X17.PDF 260075000 - SHEET - A1-1A - FIRST FLOOR PLAN - AREA-A.PDF 260075000 - SHEET - A2-0 - EXTERIOR ELEVATIONS.PDF Consider An Application From Hydrite Chemical Co. For Approval Of A Site Plan Amendment For The Construction Of A New 2,560 Sq. Ft. Building And Associated Pipe Bridge At The Existing Facility Located At 114 N. Main Street. Discuss An Application From Johnson Health Tech For Approval Of A Site Plan Amendment For The Expansion Of An Existing Parking Lot At The Former Madison Window Cleaning Building Located At 205 Commerce Parkway. CG_VAR_PC_JHT-SITE_2026-10-14-UPDATED.PDF CG_JHTPARKING_2026-10-06.PDF JOHNSON HEALTH TECH_STRAND REVIEW.PDF 205 COMMERCE FGCC 093026.PDF 261569_CIVIL PLANS_2026-09-28.PDF Consider An Application From Johnson Health Tech For Approval Of A Site Plan Amendment For The Expansion Of An Existing Parking Lot At The Former Madison Window Cleaning Building Located At 205 Commerce Parkway. Budget Review Committee 10-12-2026 BUDGET REVIEW COMMITTEE.PDF Utility Commission 10-14-26 UTILITY AGENDA.PDF Public Works, Properties And Sustainability Committee 9-16-26 PW AGENDA.PDF Discuss An Agreement For Services With GRAEF Regarding The Active Transportation Plan. COTTAGE GROVE_TRAFFIC STUDY_DRAFT PROPOSAL_2026-10.PDF 2026-1012.00 - COTTAGE GROVE ATP DRAFT CONTRACT.PDF Consider An Agreement For Services With GRAEF Regarding The Active Transportation Plan. Ad Hoc Architectural Review Committee 10-14-2026 ARC AGENDA.PDF Deer-Grove EMS Commission 10-15-2026 DGEMS COMMISSION PACKET.PDF Reports From Village Officers Village Attorney i. Legal briefings/status update. Village Administrator VILLAGE ADMINISTRATOR REPORT - 10.19.26.PDF PROJECTS, INITIATIVES, AND DEVELOPMENT TRACKER 10.15.26.PDF Communications And Miscellaneous Business Consider Approval Of Vouchers BILLS LIST.PDF PAY APPLICATION 10.PDF Correspondence Upcoming Community Events Future Agenda Items Discuss And Consider Enter Into Closed Session Regarding Village Administrator Performance Evaluation Process. The Village Of Cottage Grove Village Board Will Enter Into Closed Session Pursuant To Wisconsin State Statute §19.85 (1)(C) Considering Employment, Promotion, Compensation Or Performance Evaluation Data Of Any Public Employee Over Which The Governmental Body Has Jurisdiction Or Exercises Responsibility. Reconvene Into Open Session And Possible Consideration Of Closed Session Items. Adjournment Any item on the agenda is subject to final action. Notice: Persons needing special accommodations should call 608-839-4704 at least 24 hours prior to the meeting. It is possible that members of and possibly a quorum of members of other governmental bodies may attend the above stated meeting to gather information; no action will be taken by any governmental body at the above -stated meeting other than the governmental body specifically referred to above in this notice. Upcoming meetings: 10/21- Library Board 10/22- Parks & Rec 10/26- VB Budget Workshop 10/28- Board of Review 10/29- Emergency Management 10/29- Joint Fire Commission 1. 2. 3. 4. 5. Documents: a. 6. a. Documents: a.i. b. Documents: b.i. 7. a. Documents: a.i. b. Documents: b.i. 8. a. Documents: a.i. Documents: a.i.1. a.ii. Documents: a.ii.1. a.iii. Documents: a.iii.1. b. Documents: c. Documents: d. Documents: d.i. Documents: d.i.1. e. Documents: f. Documents: 9. a. b. Documents: 10. a. Documents: b. c. d. 11. 12. 13. VILLAGE OF COTTAGE GROVE VILLAGE BOARD OF TRUSTEES Monday, October 5, 2026 MINUTES 1. Call to Order President Kelm-Nelson called the Village Board of Trustees to order at 6:30 pm. This was a hybrid meeting. 2. Determination of quorum and that the agenda was properly posted. It was determined that there was a quorum of members present, and that the agenda was properly posted. The Village Board members present were Cindi Kelm-Nelson, Heidi Murphy, Chris Stoa (attended virtually), Paula Severson, JP Villavicencio, Casey Erlandson and Dr. Rene Buenzow. Staff present were Administrator Matt Giese, Administrator/Finance Director Cameron Sawyer, Assistant Administrator/HR Manager Inga Cushman, Planning & Development Director Erin Ruth, Director of Parks and Recreation Sean Brusegar, Police Chief, Mark Garry, Clerk Lisa Kalata, EMS Director Eric Lang (attended virtually), and Village Attorney Rick Manthe 3. Pledge of Allegiance. 4. PUBLIC APPEARANCES – Public’s opportunity to speak- None 5. Discuss the minutes of the Village Board meeting on September 21, 2026. 6. Consider the minutes of the Village Board meeting on September 21, 2026. Motion by Murphy to approve September 21, 2026, meeting minutes, seconded by Erlandson. Motion carried with a voice vote of 7-0-0. 7. New Business a. Annual review of Village consultants and service providers. i. Johnson Block-Larry Rasmussen was present to give a brief overview of services. b. Discuss Proclamation RE: Pedestrian Safety Month. (Presented by Village President Kelm-Nelson and Trustee Murphy) b.i. Consider Proclamation RE: Pedestrian Safety Month. Motion by Erlandson to approve the proclamation, seconded by Villavicencio. Motion carried with a voice vote of 7-0-0. c. Discuss Resolution 2026-19 Re: October as Fire Prevention Month. (Presented by Trustee Murphy and President Kelm-Nelson) c.i. Consider Resolution 2026-19 Re: October as Fire Prevention Month. Motion by Villavicencio to approve resolution 2026-19 as presented, seconded by Erlandson. Motion carried with a voice vote of 7-0-0. d. Discuss potential property acquisitions in TID 9. The Village Board may vote to enter closed session under item 11 to be held at the end of the meeting. d.i. Consider potential property acquisitions in TID 9. The Village Board may vote to enter closed session under item 11 to be held at the end of the meeting. No action taken. e. Discuss attendance policy for intergovernmental meetings. (Presented by Trustee Stoa and President Kelm-Nelson) e.i. Consider attendance policy for intergovernmental meetings. Motion by Villavicencio to direct staff to include in the village board handbook along with drafting an ordinance change for all committees regarding unexcused absences, seconded by Erlandson. Motion carried with a voice vote of 5-0-2 with Buenzow and Severson voting No.87. New Business 8. Reports from Village Boards, Commissions & Committees a. Law Enforcement Committee Stoa reported there was an update on the new police station. They discussed ALPRS. They approved the 2027 budget with a few changes. The monthly Chief’s reports were reviewed. a.i. Discuss the Upfitting of Squad 255 for Command/Emergency Management. a.i.1. Consider the Upfitting of Squad 255 for Command/Emergency Management. Motion by Erlandson to approve the upfitting of Squad 255 for Command/Emergency Management as presented, seconded by Murphy. Motion carried with a voice vote of 6-01 with Buenzow voting No. b. Library Board Villavicencio reported they approved an update to the donation policy. They approved the 2027 budget. Programming was discussed and is going well with more attendees in 2026. The next meeting is October 21st. c. Parks, Recreation & Forestry Committee Murphy reported there was a concept plan for Juniper Fields parkland and the committee gave feedback. They discussed the 2027 budget, and the Director’s report was given. They discussed the permanent park sign at Out lot 5 at Thaden Natural Area. c.i. Discuss a permanent park sign at Out lot 5 (Thaden Natural Area). c.i.1. Consider a permanent park sign at Out lot 5 (Thaden Natural Area). No action taken. d. Natvig Landfill Monitoring Review Committee Villavicencio reported they approved the bills and the testing and monitoring results were discussed. They approved the 2027 service contract with Strand. e. Flynn Hall Committee Kelm-Nelson reported they reviewed the usage for 2026, and they have received no complaints. They approved the 2027 budget with a $100 increase from last year. f. Board of Review Kelm-Nelson reported they held the 2-hour required meeting and reviewed the roll and performed all the statutory requirements. They considered 4 waivers requests and approved one. They conducted one objection hearing. The next meeting will be on October 28th at 5 pm. g. Cottage Grove Fire District Commission Murphy reported the Chief’s report was reviewed. They discussed the 2027 budgets and ESB maintenance. The snow removal and lawn care was discussed and there are other areas of the ESB maintenance that will be discussed at the Joint Village/Town meeting this week. h. Joint Review Board Kelm-Nelson reported they appointed officers, Ehlers gave the annual report, and they approved the resolutions as required. 9. Reports From Village Officers a. Village Attorney i. Legal briefings/status update. ii. Update on Road to Housing Act. Attorney Manthe gave an overview of the federal housing bill. b. Village Administrator Giese reported that Trista Taylor was a presenter at the National Parks and Recreation conference. Kelm-Nelson reported she received an email recognizing Giese’s 20 years of service. c. Assistant Administrator/Finance Director i. Discuss 2026 Budget Amendment 2026-005. i.a. Consider 2026 Budget Amendment 2026-005. Motion by Murphy to approve the 2026 Budget Amendment 2026-005, seconded by Erlandson. Motion carried with a voice vote of 7-0-0. 10. Communications and Miscellaneous Business a. Consider approval of vouchers. Motion by Erlandson to approve the vouchers, seconded by Murphy. Motion carried with a voice vote of 5-0-2 with Buenzow and Severson voting No. a.i. Consider approval of vouchers. Motion by Murphy to approve the vouchers, seconded by Erlandson. Motion carried with a voice vote of 6-1-0 with Buenzow voting No. b. Correspondence- Sawyer reported there were four attendees for the budget listening sessions and one online form. c. Upcoming community events- PTO annual fall fest on Saturday, October 10th. Walk and Roll bike to school day on October 8th. Fire Department Open House at the Fire Station. Stormwater Utility PIM on October 13th from 5-7 pm. Library Badger Talks on October 19th and 28th at Drumlin Reserve. d. Future agenda items- List of focus groups for the Comp Plan. Associated Appraisal service provider review. 11. Discuss and consider entering into closed session to discuss and consider potential acquisition of TID#9 property as discussed in item 6.d. The Village of Cottage Grove Village Board will enter Closed Session pursuant to Wisconsin State Statute §19.85 (1)(e) Deliberating or negotiating the purchasing of public properties, the investing of public funds, or conducting other specified public business, whenever competitive or bargaining reasons require a closed session. Motion by Kelm-Nelson to enter closed session at 7:47 pm to Discuss and consider entering into closed session to discuss and consider potential acquisition of TID#9 property as discussed in item 6.d. The Village of Cottage Grove Village Board will enter Closed Session pursuant to Wisconsin State Statute §19.85 (1)(e) Deliberating or negotiating the purchasing of public properties, the investing of public funds, or conducting other specified public business, whenever competitive or bargaining reasons require a closed session, seconded by Murphy. Motion carried with a roll call vote of Buenzow Aye, Erlandson Aye, Kelm-Nelson Aye, Murphy Aye, Severson Aye, Stoa Aye, Villavicencio Aye. 12. Discuss and consider enter into closed session regarding Village Administrator Performance evaluation process. The Village of Cottage Grove Village Board will enter into Closed Session pursuant to Wisconsin State Statute §19.85 (1)(c) considering employment, promotion, compensation or performance evaluation data of any public employee over which the governmental body has jurisdiction or exercises responsibility. Motion by Kelm-Nelson to enter closed session at 7:48 pm to discuss Village Administrator Performance evaluation process. The Village of Cottage Grove Village Board will enter into Closed Session pursuant to Wisconsin State Statute §19.85 (1)(c) considering employment, promotion, compensation or performance evaluation data of any public employee over which the governmental body has jurisdiction or exercises responsibility, seconded by Erlandson. Motion carried with a roll call vote of Buenzow Aye, Erlandson Aye, Kelm-Nelson Aye, Murphy Aye, Severson Aye, Stoa Aye, Villavicencio Aye. 13. Reconvene into open session and possible consideration of closed session items. Motion by Murphy to reconvene into open session at 8:32 p.m., seconded by Erlandson. Motion carried with a roll call vote Buenzow Aye, Erlandson Aye, Kelm-Nelson Aye, Murphy Aye, Severson Aye, Stoa Aye, Villavicencio Aye. Motion by Erlandson to give the Village Administrator a 3% merit increase along with a 6% bonus, seconded by Villavicencio. Motion carried with a voice vote of 6-0-1 with Buenzow voting No. 14.Adjournment Motion by Murphy to adjourn at 8:34 p.m., seconded by Erlandson. Motion carried with a voice vote of 7-0-0. Lisa Kalata, Clerk Village of Cottage Grove Approved: These minutes represent the general subject discussed in this meeting but do not reflect a verbatim documentation of the subjects and conversations that took place. VILLAGE OF COTTAGE GROVE & TOWN OF COTTAGE GROVE VILLAGE BOARD OF TRUSTEES & TOWN BOARD OF SUPERVISORS Tuesday, October 6, 2026 MINUTES 1. Call to Order a. Cottage Grove Town Board of Supervisors- Chairperson Anders called the Town Board of Supervisors meeting to order at 5:30 pm b. Cottage Grove Village Board of Trustees- President Kelm-Nelson called the Village Board of Trustees to order at 5:30 pm. This was a hybrid meeting. 2. Determination of quorum and that the agenda was properly posted. It was determined that there was a quorum of members present, and that the agenda was properly posted. The Village Board members present were Cindi Kelm-Nelson, Chris Stoa (attended virtually), Heidi Murphy, Paula Severson, Casey Erlandson, and JP Villavicencio. Dr. Rene Buenzow was absent and excused. Town Board members present were Steve Anders, Mike Fonger, Kristi Williams, Troy Eickhoff and Patrick Buchholz. Staff present were Village Administrator Matt Giese, Assistant Administrator/Finance Director Cameron Sawyer, Police Chief Mark Garry, Clerk Lisa Kalata, Planning Director Erin Ruth, EMS Director Eric Lang, Fire Chief Nick Archibald and Village Attorney Rick Manthe. 3. Pledge of Allegiance. 4. PUBLIC APPEARANCES – Public’s opportunity to speak- none 5. Unfinished Business a. Discuss joint ESB lease agreements. The Village and Town attorneys are working on the agreement. This will be on the next joint meeting agenda on November 4, 2026. b. Discuss and consider proposal to investigate an emergency connection at Meadowlark St. (Presented by Trustee Severson). Motion by Erlandson to direct staff to move forward with quotes and options for connection between Meadowlark St. and Wellington Plc., seconded by Murphy. Motion carried with a voice vote of 6-0-0. c. Discuss and consider joint Village and Town meeting at 5PM on November 4, 2026 at Village Hall. Motion by Williams to hold the joint Village and Town meeting on November 4, 2026 @ 5 pm at Village Hall, seconded by Anders. Motion carried with a voice vote of 5-0-0. Motion by Murphy to have the joint Village and Town meeting on November 4, 2026 @ 5 pm at Village Hall, seconded by Erlandson. Motion carried with a voice vote of 5-0-1 with Severson voting No. d. Discuss and consider ESB maintenance items. The direction was to add $5,000 by each municipality for the 2027 budget for ESB maintenance items. 6. Adjournment-Town Motion by Williams to adjourn at 6:10 pm, seconded by Eickhoff. Motion carried with a voice vote of 5-0-0. Adjournment-Village Motion by Erlandson to adjourn at 6:10 p.m., seconded by Murphy. Motion carried with a voice vote of 6-0-0. Lisa Kalata, Clerk Village of Cottage Grove Approved: These minutes represent the general subject discussed in this meeting but do not reflect a verbatim documentation of the subjects and conversations that took place. PHASE AGREEMENT FOR SUBDIVISION IMPROVEMENTS PHASE 1 THIS AGREEMENT FOR SUBDIVISION PUBLIC IMPROVEMENTS AND RELEASE OF LOTS FOR DEVELOPMENT (this “Phase Agreement”) is entered into this 31st day of July, 2026, by and between Kosh Valley, LLC, a Wisconsin limited liability company, (the “Developer”), and the Village of Cottage Grove (“Village”), a Wisconsin municipal corporation. RECITALS A. The Developer has received approval by the Village of Cottage Grove for a Plat known as Juniper Fields (hereinafter the “Plat”) for an area of land located in the Village of Cottage Grove. B. Developer intends to develop the Plat in phases (each a “Phase” and collectively the “Phases”). C. Village of Cottage Grove ordinances require that provisions be made for the installation of Public Improvements, including but not limited to, streets, street lighting, sanitary sewers and water mains and appurtenances thereto, storm sewer and stormwater drainage facilities, greenways, walk ways, and erosion controls, and that such improvements be constructed by the Developer without cost to the Village. D. The Developer is bound by an agreement dated July 20, 2026, entitled “Agreement to Undertake Development (Juniper Fields),” (“Development Agreement”) relating to the installation of Public Improvements needed to serve the Plat, among other things. E. The Village’s purposes in entering into this Phase Agreement are to provide for the installation of Public Improvements to serve lots 1-47 of the Plat (“Phase 1”), to require the Developer to pay the direct and indirect costs related to the required Public Improvements, and to avoid the harmful effects of substandard subdivisions. F. The Developer now wishes to proceed with the installation of Public Improvements needed to serve Phase 1. AGREEMENT NOW, THEREFORE, for good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the Developer and the Village agree as follows: 1. Agreement to Undertake Development. The Developer continues to be bound by the Development Agreement. Except as expressly provided otherwise in this Phase Agreement, the Development Agreement shall govern the development of Phase 1 and remains in full force and effect. 2. Public Improvements. The Developer shall construct and install those Public Improvements needed to serve Phase 1, as determined by the Village Engineer and Village Director of Public Works . The Public I mprovements contemplated herein include the following: interceptor sewer and sanitary sewer service mains, manholes, laterals and all appurtenances; water mains, laterals, hydrants, valves and all appurtenances; storm sewer mains; streets, curb and gutter and sidewalks; street lamps; street signs; and facilities for the provision of natural gas, electric, cable, and telephone utility service (hereinafter referred to as the “ Public Improvements”), in accordance with Plans and Specifications approved by the Village Engineer. The Public Improvements will be designed, constructed and installed by the Developer in accordance with the current standard specifications of the Village of Cottage Grove except as variances to or waivers of those requirements have been properly granted, and in accordance with Plans and Specifications approved by the Village Engineer. Developer shall provide two copies of the approved, signed and stamped Plans and Specifications to the Village Engineer, and one copy shall be provided to each contractor. Only stamped and signed copies of the Plans and Specifications shall be used on the job site. Where standards and/or specifications have not been established by the Village, all work shall be made in accordance with established engineering practices as designated and approved by the Village Engineer. 3. Village Approval of Starting Dates. No land disturbances or work shall begin without the Village Engineer’s approval of a starting date and schedule which shall be submitted by the Developer to the Village Engineer at a preconstruction meeting between Developer and the Village. A starting date will not be approved until the Financial Security Instrument required by the Development Agreement has been provided to the Village. a. The parties acknowledge that Developer will need to manage stormwater for Phase 1 with temporary off -site stormwater management facilities. No start date for construction of Public Improvements will be approved, and Developer shall not commence construction of Phase 1 Public Improvements until the parties have entered into a mutually acceptable stormwater management agreement for the temporary stormwater management facilities needed to service Phase 1. The stormwater management agreement shall, at a minimum, require Developer to maintain the temporary stormwater management facilities at its sole cost and expense and allow the Village to enter onto those privately owned and maintained facilities to perform maintenance and repairs if Developer fails to do so, and charge the Developer for the costs of maintenance and repairs. 4. Release of Lots. Subject to all requirements of this Phase Agreement and the Development Agreement, Developer is hereby permitted to design, construct, and install all Public Improvements necessary to serve lots 1 through 47. 5. Developer’s Project Manager . The Developer hereby designates Steve Decleene as the Project Manager, who shall act as the Developer’s representative during the construction of the Public Improvements. The Project Manager shall be available during construction hours on the job site or available by telephone at 262.894.3759. 6. Change to Work Order . The Village shall not be responsible for any costs or changes relating to this Project except those specifically enumerated and agreed upon in this or subsequent written, signed agreements between the Developer and the Village. 7. Time of Completion . All work specified herein in Phase 1, shall be completed within twelve months after the approved start date. No damages may be recovered by Developer or any person against the Village for delay in completion of the Public Improvements. 8. Definitions. Any capitalized terms in this Phase Agreement that are not defined shall have the same meaning as the Development Agreement. 9. Effective Date. This Phase Agreement is entered into as of the day and year first written above. [Signature pages follow.] IN WITNESS WHEREOF, the parties have hereunto set their hands and seals as of the dates noted below. VILLAGE OF COTTAGE GROVE By: Cynthia Kelm-Nelson, Village President ATTEST: Lisa Kalata, Village Clerk DEVELOPER By: _______________________________ Print name: ______________________ Title: ___________________________ PHASE AGREEMENT FOR SUBDIVISION IMPROVEMENTS PHASE 1 THIS AGREEMENT FOR SUBDIVISION PUBLIC IMPROVEMENTS AND RELEASE OF LOTS FOR DEVELOPMENT (this “Phase Agreement”) is entered into this 31st day of July, 2026, by and between Kosh Valley, LLC, a Wisconsin limited liability company, (the “Developer”), and the Village of Cottage Grove (“Village”), a Wisconsin municipal corporation. RECITALS A. The Developer has received approval by the Village of Cottage Grove for a Plat known as Juniper Fields (hereinafter the “Plat”) for an area of land located in the Village of Cottage Grove. B. Developer intends to develop the Plat in phases (each a “Phase” and collectively the “Phases”). C. Village of Cottage Grove ordinances require that provisions be made for the installation of Public Improvements, including but not limited to, streets, street lighting, sanitary sewers and water mains and appurtenances thereto, storm sewer and stormwater drainage facilities, greenways, walk ways, and erosion controls, and that such improvements be constructed by the Developer without cost to the Village. D. The Developer is bound by an agreement dated July 20, 2026, entitled “Agreement to Undertake Development (Juniper Fields),” (“Development Agreement”) relating to the installation of Public Improvements needed to serve the Plat, among other things. E. The Village’s purposes in entering into this Phase Agreement are to provide for the installation of Public Improvements to serve lots 1-47 of the Plat (“Phase 1”), to require the Developer to pay the direct and indirect costs related to the required Public Improvements, and to avoid the harmful effects of substandard subdivisions. F. The Developer now wishes to proceed with the installation of Public Improvements needed to serve Phase 1. AGREEMENT NOW, THEREFORE, for good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the Developer and the Village agree as follows: 1. Agreement to Undertake Development. The Developer continues to be bound by the Development Agreement. Except as expressly provided otherwise in this Phase Agreement, the Development Agreement sha ll govern the development of Phase 1 and remains in full force and effect. 2. Public Improvements. The Developer shall construct and install those Public Improvements needed to serve Phase 1, as determined by the Village Engineer and Village Director of Public Works. The Public Im provements contemplated herein include the following: interceptor sewer and sanitary sewer service mains, manholes, laterals and all appurtenances; water mains, laterals, hydrants, valves and all appurtenances; storm sewer mains; streets, curb and gutter and sidewalks; street lamps; st reet signs; and facilities for the provision of natural gas, electric, cable, and telephone utility service (hereinafter referred to as the “Public Improvements”), in accordance with Plans and Specifications approved by the Village Engineer. The Public Improvements will be designed, constructed and installed by the Developer in accordance with the current standard specifications of the Village of Cottage Grove except as variances to or waivers of those requir ements have been properly granted, and in accordance with Plans and Specifications a pproved by the Village Engineer. Developer shall provide two copies of the approved, si gned and stamped Plans and Specifications to the Village Engineer, and one copy shall be provided to each contractor. Only stamped and signed copies of the Plans and Specifications shall be used on the job site. Where standards and/or specifications have not been established by the Village, all work shall be made in accordance with established engineering practices as designated and approved by the Village Engineer. 3. Village Approval of Starting Dates. No land disturbances or work shall begin without the Village Engineer’s approval of a starting date and schedule which shall be submitted by the Developer to the Village Engineer at a preconstruction meeting between Developer and the Village. A starting date will not be ap proved until the Financial Security Instrument required by the Development Agreement has been provided to the Village. 3.a. The parties acknowledge that Developer will need to manage stormwater for Phase 1 with temporary off-site stormwater mana gement facilities. No start date for construction of Public Improvements will be approved, and Developer shall not commence construction of Phase 1 Public Improvements until the parties have entered into a mutually acceptable stormwater management agreement for the temporary stormwater management facilities needed to service Phase 1. The stormwater management agreement shall, at a minimum, require Developer to maintain the temporary stormwater management facilities at its sole cost and expense and allow the Village to enter onto those privately owned and maintained Formatted: Indent: Left: 0.5", No bullets or numbering Formatted: Indent: Left: 0.5" facilities to perform maintenance and repairs if Developer fails to do so, and charge the Developer for the costs of maintenance and repairs. 4. Release of Lots. Subject to all requirements of this Phase Agreement and the Development Agreement, Developer is hereby permitted to design, construct, and install all Public Improvements necessary to serve lots 1 through 47. 5. Developer’s Project Manager. The Developer hereby designates Steve Decleene as the Project Manager, who shall act as the Devel oper’s representative during the construction of the Public Improvements. The Project Ma nager shall be available during construction hours on the job site or available by telephone at 262.894.3759. 6. Change to Work Order . The Village shall not be res ponsible for any co sts or changes relating to this Project except those specific ally enumerated and agreed upon in this or subsequent written, signed agreements between the Developer and the Village. 7. Time of Completion . All work specified herein in Phase 1, shall be completed within twelve months after the approved start date. No damages may be recovered by Developer or any person against the Village for delay in completion of the Public Improvements. 8. Definitions. Any capitalized terms in this Phase Agreement that are not defined shall have the same meaning as the Development Agreement. 9. Effective Date. This Phase Agreement is entered into as of the day and year first written above. [Signature pages follow.] IN WITNESS WHEREOF, the parties have here unto set their hands and seals as of the dates noted below. VILLAGE OF COTTAGE GROVE B y : Cynthia Kelm-Nelson, Village President ATTEST: Lisa Kalata, Village Clerk DEVELOPER By: _______________________________ Print name: ______________________ Title: ___________________________ Trustee Memo Village of Cottage Grove, WI 1 Meeting Date: 10-19-26 Memo Date: 10-15-26 To: Village Board From: Cindi Kelm-Nelson, Village President Subject: Comprehensive Plan Update Focus Group Appointments Background/Overview I have organized the following four focus groups to support community input and research for the Village’s Comprehensive Plan update. These groups are consistent with the direction of the Plan Commission and the Village Board’s prior approval. The following focus groups are scheduled for November 5, 2026, and will be appropriately noticed: 1. Business Leaders, 11:00 a.m., via Zoom 2. Seniors and Students, 5:00 p.m., Municipal Services Building (MSB) 3. Residents, 6:00 p.m., MSB 4. New and Longtime Residents, 7:00 p.m., MSB The Village Board is respectfully requested to approve the proposed participants for each focus group. Please consider approving the broad category of MGSD students, as proposed by the district, as well as seniors designated by Drumlin Reserve. Additional appointments may be forthcoming as I continue to receive RSVPs. If the Board is amenable, I will bring those forward for consideration at the November 2, 2026, Village Board meeting. I appreciate the time, willingness, and commitment of these community members to contribute their perspectives and help shape the Village’s future! 1 (Business Leaders) 2 (Seniors & Students) 3 (Residents) 4 (New and Longtime Residents) 1 Mike Swanson, Atlantis Valley Foods MGSD student list Melissa Reithmeyer Eileen and Dave Conklin 2 Andrew Homburg, Homburg Development Drumlin Reserve list Kate Martin Charles Pelleymounter 3 Dawn Auby, Johnson Health Tech Jim Schnitzler Michael John Holl Mike Hackel 4 Jason Vangalis, Amazon April Harding, Drumlin Reserve/Capri Pastor Nate Abrahamson 5 Britt Leach, CG Chamber ED Steve DeCleene, Neumann Development Charlie Rodgers 6 Mike Day, Piggly Wiggly Abby McDowell 7 Brooke Goudreau, Kids Safari 8 October 2, 2026 Re: Cottage Grove Chamber Christmas in the Grove Parade To: Cottage Grove Village Board: I am writing today to request a partnership with the Village for our annual Christmas in the Grove Parade. We have been hosting this community favorite for many years and would like to continue to do so with your support. In reading the Special Events Manual, we feel that we meet the criteria to partner with the Village for this fun, free community event. Because we meet the criteria, we are humbly asking if you will waive the cost of the Special Events Permit fee for our event on Friday December 4th on Main Street at 6:30 P .M. If you have any follow up questions, please feel free to contact Britt Leach CgChamber@CottageGroveChamber.com Thank you for your consideration! Britt Leach Executive Director Cottage Grove Chamber of Commerce 221 E. Cottage Grove Road Cottage Grove, WI 53527 608-839-4704 www.vi.cottagegrove.wi.gov SPECIAL EVENT PERMIT APPLICATION Permit approved Date Permit fees paid Date Deposit paid Date Deposit returned? Date FEES ARE NON-REFUNDABLE APPLICATION AND PERMIT FEE IS DUE 60 DAYS PRIOR TO YOUR EVENT. ORGANIZATION INFORMATION Name of Organization Street Address City State Zip Phone Number Are you an IRS approved not for profit organization?Circleone Yes No Event Contact Person(First & Last Name) Address City State Zip Email Phone Number Day of Event Phone Number EVENT INFORMATION Name of Event Date(s) of Event Event Start Time Event End Time Location of the Event* Will your event take place near a residential neighborhood?If yes, you will be required to notify all adjacent property owners when the event will occur.Circle One Yes No You MUST attach a detailed map/sketch of your event indicating the specific location, layout of your event, the direction of the route, including all turns and the number of traffic lanes to be used. *If you are using a Village Park, you must reserve the park through thePark/Recreation Department prior to getting your special event permit approved by the Village Board. Call (608) 839-8968. Generally describe your event and its purpose Based on the class definitions found in the manual, what class is your event? Circle One. Class I Class II Estimated Number of Participants Spectators Vendors OTHER INFORMATION Is there an outdoor bar that will serve alcohol? If yes, liquor and bartender licenses are necessary under separate application. Circle One. Yes No Please list the number of Village of Cottage Grove licensed bartenders that will be on site: Will you be selling/serving food? If yes, you will need to contact the Dane County Health Department for proper permits. Circle One. Yes No If yes, will the food be distributed by a Food Truck already permitted by the Village staff? Yes No Will you be selling merchandise? If yes, you will need to obtain a Peddler's Permit under separate application. Circle One. Yes No Will your event need electricity? If yes, the Fire Department and Building Inspection Department will need to inspect prior to being energized. Circle One. Yes No Will you be setting up any lighting? If yes, the Fire Department and Building Inspection Department will need to inspect prior to being energized. Circle One. Yes No Will your event require any fencing? If yes, please provide plans for the fencing location and the gates. Circle One. Yes No Does the event involve fireworks? If yes, you will need to obtain a fireworks permit under separate application through the Cottage Grove Fire Department. Circle One. Yes No Does the event involve amplified music? Circle One. Yes No If yes, will the amplified music be a (Circle one) : Band DJ Other Hours of amplified music: Please list the number of security staff you will be providing for the event: Will you need barricades provided by the Village for your event, if so, how many? Will you be erecting any tents, canopies or other temporary structure(s)? If yes, You will need to provide a plan for their proposed locations and the Fire Department and Building Inspection Department will need to inspect these structures prior to the start of your event. Circle One. Yes No Will you be providing portable restrooms and wash stations? Circle One. Yes No If yes, how many will you provide and where will they be located? Also how will solid waste be disposed of? Provide name and contact info for companies providing these services. Will you provide parking for participants? Parking plan with map must be included with application. Circle One. Yes No If yes, where will parking be available? Will you provide a dumpster/clean-up services? Circle One. Yes No If yes, please describe your clean-up and refuse collection plan and provide the name and contact info for the company providing the service. OTHER INFORMATION CONTINUED What other assistance do you foresee needing from theVillage (personnel, materials, and/or equipment)? Have you reviewed and do you have a copy of theVillage of Cottage Grove Special Events Manual as well as the Village Special Events Ordinance? Circle One. Yes No INSURANCE REQUIREMENTS The Special Event Sponsor must obtain liability insurance for an event that includes alcohol, has more than 150 peopleper day, or involves a road closure. Proof of this insurance with coverage no less than $1,000,000 which names and endorses the Village, its officers, agents, employees and contractors as an additional insured party is due no later than 20 days before the event. Are you able to provide these insurance documents, if required?Circle One. Yes No DEPOSIT REQUIREMENTS The applicant may be required to submit to the Village a cleaning/damage deposit of $200 per day for each scheduled day of the event (or portion thereof), two weeks prior to the starting date of the event. The deposit shall be refunded to applicant, if, upon inspection, all is in order, or a prorated portion thereof as may be necessary to reimburse the Village for loss or cleaning costs. The Village reserves the right to retain the entire deposit if cleanup is not completed satisfactorily in the time frame as specified in the permit. Unless otherwise stated in the permit, the applicant shall befully responsible for all necessary cleanup associated with the permitted event to be completed within twelve (12) hours after the conclusion of the event. (This deposit is separate from any deposit required by the Park/Recreation Department for park use). TERMINATION OF AN EVENT The Village reserves the right to shut down a special event that is in progress if it is deemed to be a public safety hazard by Police Department, Fire Department, EMS and/or there is a violation of Village Ordinances, State Statutes or the terms of the Applicant's permit. The Village Administrator and/or his/her designee may revoke an approved Special Events Permit if the applicant fails to comply in good faith with the provisions of the permit prior to the event date. By signing this form, the applicant certifies authorization to act on behalf of their organization and hereby agrees to hold the Village, its officers, employees, agents and contractors, harmless against all claims, liability, loss, damage or expense (including but not limited to actual attorney's fees) incurred by the Village for any damage or injury to person or property caused by or resulting directly or indirectly from the activities for which the permit is granted. Any change to coverage requires Village approval. Signature of Applicant Date For staff use only Fees collected with application submission: Class I Event Class II Event PERMIT FEES CHARGED Application forwarded to: Deputy Administrator Building Inspector Fire Chief Addt’lfees charged by Departments: Administration Building Inspection Fire Parks & Rec Director Parks & Recreation Village Board approval, if necessary, on: Police Chief Public Works Director Police Public Works Police Department approval*: EMS Fire Department Approval*: EMS EMS Approval*: *Comments/concerns should be attached separately $150.00 SPECIAL EVENT APPLICATION CONTACT INFORMATION & FEES SHEET 221 E. Cottage Grove Road CottageGrove, WI 53527 608-839-4704 www.vi.cottagegrove.wi.gov DEPARTMENT CONTACTS: Clerk 608-839-4704 Police 608-839-4652 Building Inspection 608-697-7779 Parks & Recreation 608-839-8968 Fire 608-839-4343 Public Works & Utilities 608-839-5813 Deer-Grove EMS 608-839-5658 VILLAGE PERMIT AND OTHER FEES: Barricades Up to 6 barricades - $35; over 6 barricades - $70 Class Ie v e n t $300 per day Class II event $150 per day Electrical Inspection If a temporary electrical service is needed a permit is required from GEC. EMS service (ambulance on site) Set by Deer-Grove EMS Fireworks Permit No charge; State and local permit required Garbage cans (55 gallon) $10.00 per garbage can Host Permit $20.00 per year Park Rental Permit Shelter Rental Required, see Park and Rec fee schedule Pre-event Safety Inspection $75.00 per hour Security Deposit $200.00 per day; May encounter an additional deposit if utilizing a park facility. Temporary Bartender License $30.00 Temporary Class B (Picnic) Beer & Wine Licenses $10.00 (Picnic License for Alcoholic Beverages) Tent Inspection $31.65 if under 2500 sq. ft.; per tent, per inspection. Each tent requires separate application. TransientMerchant Permit $20.00 application fee. Christmas in the Grove Comments for departments: Parks & Recreation No comments EMS: No concerns from the EMS perspective Public Works: Public Works has no specific comments regarding the event. We will coordinate with PD on locations of No Parking signs, as needed, and barricades, cones, ect. for the event. Police Department: PD has been meeting with Chamber for this event. No issues from PD side of things. Fire Department: No issues on the fire side. ORDINANCE 16-2026 REPEALING AND RECREATING CHAPTER 163 OF THE VILLAGE OF COTTAGE GROVE CODE OF ORDINANCES The Village Board of the Village of Cottage Grove, Dane County, Wisconsin, does hereby ordain as follows: Recitals A. The Village of Cottage Grove operates a parks, recreation, and forestry committee, a public works committee, and a law enforcement committee. B. The Village desires to clarify the roles and responsibilities of the parks, recreation, and forestry committee, the public works committee, and the law enforcement committee. Ordinance Section 1. Amend section 12-2.A. of the Village of Cottage Grove Code of Ordinances to read as follows: A. The Committee shall be comprised of one Village Board member and four citizen members. The Director of Parks, and Recreation, and Forestry and the Village Forester shall be the staff liaisons for this Committee. The Committee may include up to two additional members who are current students in Grade 9, 10, 11, or 12 in a public or private high school, or the equivalent grade level in a home-based educational program. Section 2. Amend Section 12-2.C. of the Village of Cottage Grove Code of Ordinances to read as follows: C. Duties and responsibilities. The Committee shall have the following duties and responsibilities, which are not all inclusive and shall be advisory except as otherwise provided: (1) Parks. (a) To create and develop both a short- and long-term plan and budget for the creation, development, and acceptance of parkland or purchase of parkland, and/or the development of recreational trails. Said plan should be reviewed on an annual basis to ensure th at it continues to meet the needs of the community. (b) To develop criteria by which the Committee, the Public Works, Properties, and Sustainability Committee and the Village Board can determine if parkland, recreational trails or passive parkland is acceptable. These criteria shall be in a written form which s hall be provided to each developer, citizen or interested individual for his or her use in proposing the development of, acceptance of or purchase of parkland or recreational trails. Reserved. (c) To maintain an inventory of the parks, their usage and to determine if the needs of the neighborhood within which the park or recreational trail is located are being met. (d) To create and develop a plan with an associated budget for maintaining the existing park areas and recreational trails within the Village. (e) To create and develop a capital improvement plan/budget for upgrading, replacing and adding to existing park/recreational facilities, equipment and/or recreational trails within the Village. (f) To research and apply for and seek alternate funding sources such as grants, donations and bequests. (g) To identify projects which will require fund -raising activities, and upon identification, the Village Board shall create an Ad Hoc Fund -Raising Committee. One member of the Committee shall serve on this Committee, along with four citizen members as appointed by the Village President and approved by the Village Board. (2) Forestry. (a) To serve in an advisory capacity to the Village Board relating to trees and shrubs located within street rights -of-way, parks, cemeteries, and other public places in the Village, and to trees and shrubs located on private property that constitute a hazard, threat or nuisance as described herein. (b) To prepare and maintain an inventory of trees located on public lands within the Village. (c) To prepare and recommend to the Village Board a plan for the planting, care and maintenance of trees in the Village, including the number, species and location. (d) To identify, improve and promote desirable plant species. (e) To apply for county, state, federal and private grant moneys for the preparation and implementation of the Village's trees and natural area program upon approval by the Village Board. (f) To recommend such persons or firms who are qualified in urban forestry to assist in the development of urban forestry and natural area management for the Village. (g) To provide a forum for and encourage public comments on Village tree and natural area plans and programs. (h) To annually conduct Arbor Day observance and ceremonies. (i) Inform and educate Village citizens about the care of natural areas in their neighborhoods. (j) To maintain "Tree City USA" status. (3) Recreation. (a) To work with the Recreation Director to provide recreational (educational and leisure) activities, both physical and/or cultural in nature, to the Village and Town residents; to annually review that these recreational, educational and leisure activities meet the needs for all income and age groups of the community. (b) To work with other communities, organizations or service agencies to provide the most cost -effective method of developing and maintaining recreational programs or activities. (c) To develop a working relationship with other educational facilities, schools and colleges to provide programs for the community. (d) To work with the Public Works, Properties, and Sustainability Committee to develop and maintain areas for recreational programs. Section 3. Amend section 12-4.C. of the Village of Cottage Grove Code of Ordinances to read as follows: C. Duties and responsibilities: (1) The Committee shall be advisory to the Village Board. (2) Oversee the general operations and management of the Department. (3) When the Committee expressly determines it to be prudent or necessary, prescribe, review and/or approve rules and regulations for the control and management of the sworn and nonsworn personnel of the Department. (4) Contract and purchase all necessary apparatus and supplies for the use of the Department expressly delegated to the Chief through a motion, resolution or procurement policy specifically adopted by the Committee. (5) Audit all bills, claims and expenses of the Department except where expressly delegated to the Chief through a motion, resolution or procurement policy specifically adopted by the Committee. Reserved. (6) Provide recommendations regarding general policies, plans and long-range goals for the Police Department. (7) None of the functions and powers in this section shall be construed to include powers for a Board of Police Commissioners in Wisconsin Statutes §§ 62.13(3), (4)(a), (5), (7) including but not limited to hiring, firing, disciplining or promotion of personnel, nor shall the Committee conduct any hearing or other quasi-judicial proceeding. Section 4. Amend section 12-8 of the Village of Cottage Grove code of ordinances to read as follows: § 12-8. Utility Commission. See Chapter 312., Water and Sewers, § 312-3. Section 5. Amend section 12-10 of the Village of Cottage Grove Code of Ordinances to read as follows: A. Composition. The Committee shall consist of seven members, and include at least one Trustee and four citizens. The Village Director of Public Works and the Parks, Recreation, and Forestry Director shall be an ex officio nonvoting members of the Committee. B. Appointments. (1) The Trustee shall be appointed by the Village President, subject to confirmation by the Village Board. The Trustee shall serve for a one -year term commencing May 1 of each year or until his or her successor is appointed and confirmed by the Village Board. (The Trustee shall be designated by the Village President to serve as Chairperson of the Committee.) (2) Citizen members. The citizen members of the Committee shall be appointed by the Village President, subject to confirmation by the Village Board. The terms of the citizen members shall be two -year terms. The appointments shall commence on May 1 of the year of appointment, and the members shall serve until their successors are appointed and confirmed by the Village Board. C. Powers and duties. The Public Works, Properties, and Sustainability Committee is created for the purpose of reviewing and making recommendations to the Village Board on all public works, public facilities, multi-use trail, parkland, park facilities, recreational trail and related facilities. (1) Public works: (a) Responsible for the five -year capital projects plan for infrastructure located within the Village. (b) Construction and maintenance of streets, alleys, sidewalks, gutters, multi-use trails, storm sewers, stormwater drainage , and other similar public projects. (c) Review and recommend to the Village Plan Commission updates, additions and deletions to the Comprehensive Plan - Transportation Plan. (d) Review and recommend to the Village Board all budgetary, revenue and expenditure proposals relating to public works projects. (e) Maintenance of public facilities and properties owned by the Village. (f) Recycling and garbage collection. (g) Collection of leaves and brush and compost drop off area. (h) Maintenance of public facilities owned by the Village. Reserved. (i) To promote and protect the public health, safety and welfare by monitoring and developing a program for management and maintenance of environmental corridors to include greenways, detention basins, wetlands, plant communities in public-owned natural areas or dedicated property areas within Village boundaries. Reserved. (j) Any other duties or responsibilities as directed by the Village Board. This Ordinance shall become effective upon publication and notice of this Ordinance required by Wisconsin statutes. BY ORDER OF THE VILLAGE BOARD VILLAGE OF COTTAGE GROVE _________________________________ Cynthia Kelm-Nelson, Village President ATTEST: _________________________________ Lisa Kalata, Village Clerk ORDINANCE 17-2026 REPEALING AND RECREATING CHAPTER 163 OF THE VILLAGE OF COTTAGE GROVE CODE OF ORDINANCES The Village Board of the Village of Cottage Grove, Dane County, Wisconsin, does hereby ordain as follows: Recitals A. The Village of Cottage Grove regulates erosion, sediment, and stormwater runoff in Chapter 163 of the Village of Cottage Grove Code of Ordinances. B. The Village desires to amend chapter 163 to update provisions related to updates in best management practices and Wisconsin and Dane County requirements. Ordinance Section 1. Chapter 163 of the Village of Cottage Grove Code of Ordinances is hereby repealed and replaced in its entirety with Exhibit A to this Ordinance. Section 2. This Ordinance shall become effective upon publication and notice of this Ordinance required by Wisconsin statutes. BY ORDER OF THE VILLAGE BOARD VILLAGE OF COTTAGE GROVE _________________________________ Cynthia Kelm-Nelson, Village President ATTEST: _________________________________ Lisa Kalata, Village Clerk EXHIBIT A Chapter 163 EROSION, SEDIMENT AND WATER RUNOFF CONTROL Chapter 163 EROSION, SEDIMENT AND WATER RUNOFF CONTROL § 163-1. General provisions. § 163-2. Definitions. § 163-3. Scope of geographic coverage; exclusions. § 163-4. Technical standards and specifications. § 163-5. Applicability of requirement for erosion control permits. § 163-6. Applicability of requirement for stormwater control permits. § 163-7. Exemptions and clarifications. § 163-8. Preliminary review letter. § 163-9. Erosion control and stormwater control permits and administration. § 163-10. Erosion control plan requirements. § 163-11. Stormwater management plan requirements. § 163-12. Regulations for lands or activities not otherwise subject to this chapter. § 163-13. Off-site stormwater management. § 163-14. Appeals; variances. § 163-15. Permit fees. § 163-16. Enforcement. § 163-17. Violations and penalties. [HISTORY: Adopted by the Village Board of the Village of Cottage Grove 2-21-2011 by Ord. No. 02-2011;1 amended in its entirety 5-16-2016 by Ord. No. 02-2016. Subsequent amendments noted where applicable.] GENERAL REFERENCES Comprehensive Master Plan — See Ch. 23. Building construction and fire prevention — See Ch. 130. Illicit discharge detection and elimination — See Ch. 164. Floodplain zoning — See Ch. 183. Subdivision of land — See Ch. 274. Water and sewers — See Ch. 312. Wellhead protection — See Ch. 317. Zoning — See Ch. 325. § 163-1. General provisions. A. Authority. This chapter is adopted under the authority granted by ss. 61.34(1), 61.35, 61.354, 62.23 and 236.45, Wisconsin Statutes. B. Legislative findings. (1) The Village Board of the Village of Cottage Grove finds that construction site erosion and uncontrolled stormwater runoff from land -disturbing and land development activities have significant adverse impacts upon regional water resources and the health, sa fety, property and general welfare of the community, and diminish the public enjoyment and use of natural 1. Editor’s Note: This ordinance also repealed former Ch. 163, Erosion, Sediment and Water Runoff Control, adopted 8-19-2002 by Ord. No. 15-2002, as amended in its entirety 7 -17-2006 by Ord. No. 06-2006. resources. Specifically, soil erosion and stormwater runoff can: (a) Carry sediment, nutrients, pathogens, organic matter, heavy metals, toxins and other pollutants to regional lakes, streams and wetlands; (b) Diminish the capacity of water resources to support recreational and water supply uses and a natural diversity of plant and animal life; (c) Clog existing drainage systems, increasing maintenance problems and costs; (d) Cause bank and channel erosion; (e) Increase downstream flooding; (f) Reduce groundwater recharge, which may diminish stream base flows and lower water levels in regional lakes, ponds and wetlands; (g) Contaminate drinking water supplies; (h) Increase risk of property damage and personal injury; and (i) Cause damage to agricultural fields and crops. (2) The Village Board of the Village of Cottage Grove also finds that effective sediment and stormwater management depends on proper planning, design, and timely installation of conservation and management practices and their continuing maintenance. C. Purpose and intent. (1) The purpose of this chapter is to set forth the minimum requirements for construction site erosion control and stormwater management that will diminish threats to public health, safety, public and private property and natural resources of Village of Cottage Grove. (2) This chapter is intended to regulate construction site erosion and stormwater runoff, to accomplish the following objectives: (a) Promote regional stormwater management by watershed; (b) Minimize sedimentation, water pollution from nutrients, heavy metals, chemical and petroleum products and other contaminants, flooding, and thermal impacts to the water resources of Cottage Grove; (c) Promote infiltration and groundwater recharge; (d) Protect functional values of natural watercourses and wetlands; (e) Provide a set of performance standards that are consistent with the standards set forth by Dane County and the Wisconsin Department of Natural Resources' runoff management standards contained in NR 151; (f) Achieve reductions in sediment and phosphorus load development in approved TMDL studies, and achieve a twenty -percent reduction in sediment load rates compared to no controls for existing developments; (g) Ensure no increase in the rate of surface water drainage from sites during or after construction; and (h) Protect public and private property from damage resulting from runoff or erosion. (i) Ensure no increase in temperature of stormwater post -development to protect cold water communities. D. Abrogation and greater restrictions. It is not intended by this chapter to repeal, abrogate, annul, impair or interfere with any existing easements, covenants, deed restrictions, agreements, rules, regulations, ordinances or permits previously adopted or issued pursuant to law. However, wherever this chapter imposes greater restrictions, the provisions of this chapter shall govern. E. Interpretation. In their interpretation and application, the provisions of this chapter shall be held to be the minimum requirements and shall not be deemed a limitation or repeal of any other power granted by the Wisconsin Statutes. Where any terms or requirements of this chapter may be inconsistent or conflicting, the more restrictive requirement or interpretation shall control. F. Effective date. This chapter shall become effective immediately upon publication and posting. After that date, all land-disturbing activities shall be in compliance with all provisions of this chapter. § 163-2. Definitions. The following terms, wherever they appear in this chapter, are defined as follows: AFFECTED — That a regulated activity has significantly: A. Caused negative impacts on water quality or the use or maintenance of one's property or business; or B. Endangered one's health, safety, or general welfare. AGRICULTURAL — Related to or used for the production of food and fiber, including, but not limited to, general farming, livestock and poultry enterprises, grazing, nurseries, horticulture, viticulture, truck farming, forestry, sod production, cranberry productions and wild crop harvesting. Clearing and grubbin g of an area or structural development are not agricultural activity. AVERAGE ANNUAL RAINFALL — Measured precipitation in Madison, Wisconsin, between March 12 and December 2, 1981. BANK EROSION — The removal of soil or rock fragments along the banks or bed of a stream channel resulting from high flow after rain events. BASIN — The total area drained by a waterway as designated by the Village Engineer or the total area drained by any of the waterway's tributaries, exclusive of any other drainage area. BMP or BEST MANAGEMENT PRACTICE — A practice, technique, or measure that is an effective, practical means of preventing or reducing soil erosion or water pollution, or both, from runoff both during and after land development activities. These can include structural, vegetative or operational practices. CLOSED WATERSHED — An area that does not have a surface outlet, with water only able to leave through evaporaton, infiltration, or mechanical means. Examples of a closed watershed include, but are not limited to: A. Internally drained watersheds that are at least 20,000 square feet in area and at least 1 foot in depth from invert to lowest surface outlet. B. Watersheds with no surface outlet discharges from a 2-year, 24 hour design storm. C. Areas that have historically not drained through surface outlets, as determined by the Village. COMMERCIAL — For the retail or wholesale sale of goods or services. CONNECTED IMPERVIOUSNESS — An impervious surface that is directly connected to a separate storm sewer or water of the state via an impervious flow path. CONSTRUCTION SITE EROSION CONTROL — Preventing or reducing soil erosion and sedimentation from land-disturbing activity. CONTROL PLAN — An erosion control plan required by § 163-5 or a stormwater management plan required by § 163-6. DESIGN STORM — A hypothetical rainstorm that occurs with a specified recurrence interval in the Village. For example, a 10-year, 24 hour design storm defines a rainstorm that occurs over 24 hours, with a recurrence interval of 10 years. The amounts associated with these storms are further defined as follows: A. 1-year 24-hour design storm is 2.49 inches over 24 hours using MSE4 NRCS rainfall distribution. B. 2 year, 24-hour design storm is 2.84 inches over 24 hours using MSE4 NRCS rainfall distribution. C. 10-year, 24-hour design storm is 4.09 inches over 24 hours using MSE4 NRCS rainfall distribution. D. 100-year, 24-hour design storm is 6.66 inches over 24 hours using the MSE4 NRCS rainfall distribution. E. 200-year, 24-hour design storm is 7.53 inches over 24 hours using the MSE4 NRCS rainfall distribution. F. 500-year, 24-hour design storm is 8.94 inches over 24 hours using the MSE4 NRCS rainfall distribution. DEVELOPMENT — Any of the following activities: A. Construction of a new building or other structure; B. Expansion or alteration of an existing structure that results in an increase in the ground surface dimensions of the building or structure; C. Land disturbing activity; or D. Creation of expansion of impervious surfaces. DIRECT CONDUITS TO GROUNDWATER — Wells, sinkholes, swallets, fractured bedrock at the surface, mine shafts, none-metallic mines, tile inlets discharging to groundwater, quarries, or depressional groundwater recharge areas over shallow fractured bedrock. DIRECTOR — The Director of Public Works or designee. EASEMENT — An interest in land owned by another that creates a non-possessory right to enter and use the property of another for specific purposes. EASEMENT HOLDER —The holder or beneficiary of an easement that authorizes the activity on the land for the permit sought under this chapter. EFFECTIVE INFILTRATION AREA — The area of the infiltration system that is used to infiltrate runoff and does not include the area used for site access, berms or pretreatment. EROSION (SOIL EROSION) — The detachment and movement of soil or rock fragments by water, wind, ice or gravity. EXCAVATION — Any act by which organic matter, earth, sand, gravel, rock or any other similar material is cut into, dug, quarried, uncovered, removed, displaced, relocated or bulldozed and shall include the resulting conditions. EXISTING DEVELOPMENT — Buildings and other structures and impervious area existing prior to August 22, 2001. FILL — Any act by which earth, sand, gravel, rock or any other material is deposited, placed, replaced, pushed, dumped, pulled, transported, or moved to a new location and shall include the resulting conditions. GREEN INFRASTRUCTURE — Practices that use plant or soil systems, permeable pavement or other permeable surfaces or substrates, stormwater harvest and reuse, or landscaping to store, infiltrate, or evaportanspirate stormwater and reduce flows to sewer systems or to surface waters. Green infrastructure includes, but is not limited to, the following practices: rainwater harvesting/reuse, rain gardens, bioretention systems, infiltration basins, planters that are connec ted to roof drainage, vegetated swales, permeable pavement, green roofs, and rain barrels. GRADING — Altering the elevation of the land surface by stripping, excavating, filling, stockpiling of soil materials or any combination thereof and shall include the land from which the material was taken or upon which it was placed. GULLY EROSION — A severe loss of soil caused by or resulting in concentrated flow of sufficient velocity to create a defined flow channel. HEAVILY DISTURBED SITE — A site where an area of land is subjected to significant compaction due to the removal of vegetative cover or earthmoving activities, including filling. HYDROLOGIC SOIL GROUP (HSG) — Has the meaning used in the runoff calculation methodology promulgated by the United States Natural Resources Conservation Service Engineering Field Manual for Conservation Practices. IMPERVIOUS SURFACE — Any land cover that prevents rain or melting snow from soaking into the ground, such as roofs (including overhangs), roads, sidewalks, patios, driveways and parking lots. For purposes of this chapter, all road, driveway or parking surfaces, including gravel surfaces, shall be considered impervious, unless specifically designed to encourage infiltration and approved by the local approval authority. INFILTRATION — A. Refers to any precipitation that does not leave the site as surface runoff. Also known as “stay on.” B. The process by which rainfall or runoff seeps into the soil. INFILTRATION SYSTEM — A device or practice such as a basin, trench, rain garden or swale designed specifically to encourage infiltration, but does not include natural infiltration in pervious surfaces such as lawns, redirecting of rooftop downspouts onto lawns or minimal infiltration from practices such as swales or road side channels designed for conveyance and pollutant removal only. KARST FEATURE — An area or surficial geologic feature subject to bedrock dissolution so that it is likely to provide a conduit to groundwater, and may include caves, enlarged fractures, mine features, exposed bedrock surfaces, sinkholes, springs, seeps or swallets. LAND-DISTURBING ACTIVITIES — Any land alterations or disturbances that may result in soil erosion, sedimentation, or change in runoff, including but not limited to removal of ground cover, grading, excavating, and filling of land. LANDOWNER — Any person holding title to or having an ownership interest in land. LIGHTLY DISTURBED SITE — A site where an area of land is subjected to minor compaction due to the limited removal of vegetative cover or earthmoving activities. LOCAL LAND DIVISION ORDINANCE — Any county, city, Village or town ordinance adopted under Chapter 236, Wis. Stats., to regulate the division of land. MAJOR LAND-DISTURBING ACTIVITIES — Those activities where: A. The land disturbance exceeds 20,000 square feet in area; or B. The slope of the land exceeds 6%; or C. The Village Engineer determines that special circumstances due to topography, proximity to watercourses or relation to sensitive environmental areas make the disturbance a major one. MAXIMUM EXTENT PRACTICABLE (MEP) — A level of implementing best management practices in order to achieve a performance standard specified in this chapter which takes into account the best available technology, cost effectiveness and other competing issues such as human safety and welfare, endangered and threatened resources, historic properties and geographic features. MEP allows flexibility in the way to meet performance standards and may vary based on the performance standard and site conditions. MINOR LAND-DISTURBING ACTIVITIES — Those activities where: A. The land disturbance does not exceed 20,000 square feet in area; and B. The slope of the land does not exceed 6% throughout the site. NEW DEVELOPMENT — Development that results in the cumulative increase of 20,000 square feet of impervious surface to a site since August 21, 2001. New development can also include redevelopment. NONEROSIVE VELOCITY — A rate of flow of stormwater runoff, usually measured in feet per second, that does not erode soils. Nonerosive velocities vary for individual sites, taking into account topography, soil type, and runoff rates. PEAK FLOW — The maximum rate of flow of water at a given point in a channel, watercourse, or conduit resulting from the predetermined storm or flood. PERSON — Any individual, corporation, partnership, joint venture, agency, unincorporated association, municipal corporation, county, or state agency within Wisconsin, the federal government, or any combination thereof. PERVIOUS SURFACE — Any land cover that permits rain or melting snow to soak into the ground. PERMITTEE — A landowner, easement holder, or developer who has applied for a permit under this Chapter and is responsible for the requirements of the permit. POST-DEVELOPMENT — Refers to the extent and distribution of land cover types anticipated to occur under conditions of full development of the submitted plan. This term is used to match pre - and post- development stormwater peak flows as required by the chapter. PREDEVELOPMENT — Refers to the extent and distribution of land cover types present before the initiation of the proposed of land development activity, assuming that all land uses prior to land-disturbing activity are in "good" condition as described in the Natural Resources Conservation Service Technical Release 55, "Urban Hydrology for Small Watersheds" (commonly known as TR -55). This term is used to match pre- and post-development stormwater peak flows as required by the chapter. In a situation where the cumulative impervious surface created after August 21, 2001, exceeds the twenty-thousand-square-foot threshold, the predevelopment conditions shall be those prior to the proposed land disturbance. PROTECTIVE AREA — An area of land that commences at the top of the channel of lakes, streams and rivers, or at the delineated boundary of wetlands, and extends horizontally for the width specified in § 163-11B(7)(a) from the top of the channel or delineated wetland boundary to the closest impervious surface. In this chapter, "protective area" does not include any area of land adjacent to any stream enclosed within a pipe or culvert, such that runoff cannot enter the enclosure at this location. RECHARGE — The portion of the average annual rainfall that infiltrates the soil and becomes groundwater. Recharge does not include evaporation, transpiration, or runoff from the site. REDEVELOPMENT — Any construction, alteration or improvement exceeding 4,000 square feet of land disturbance performed on sites where the existing site is predominantly developed as commercial, industrial, institutional or multifamily residential uses. Projects may include a mix of redevelopment and new impervious surfaces. New impervious surfaces added as a result of redevelopment are subject to § 163-6A. RUNOFF CURVE NUMBER (RCN) — Has the meaning used in the runoff calculation methodology promulgated by the United States Natural Resources Conservation Service Engineering Field Manual for Conservation Practices. SEDIMENT — Solid earth material, both mineral and organic, that is in suspension, is being transported, or has been moved from its site of origin by air, water, gravity or ice, and has come to rest on the earth's surface at a different site. SEDIMENTATION — The deposition of eroded soils at a site different from the one where the erosion occurred. SHEET AND RILL EROSION — A loss of soil caused by sheet flow or shallow concentrated flow, and characterized by an absence of channeling or a relatively uniform loss across the exposed upper layer of the soil or shallow irregular scouring of the soil surface. SITE — The bounded area described in an erosion control plan or stormwater management plan. SLOPE — The net vertical rise over horizontal run, expressed as a percentage, which represents a relatively homogeneous surface incline or decline over the area disturbed. SOIL LOSS RATE — The rate, usually measured in tons per acre per year, at which soil is transported beyond the perimeter of a given control site and which occurs as a result of sheet and rill erosion. This term does not apply to soil movement resulting from concentrated flow such as gully or bank erosion. STORM EVENTS — The precipitation amounts that occur over a twenty -four-hour period that have a specified recurrence interval for Dane County, Wisconsin. For example, one-, two-, ten-, and one-hundred- year storm events mean the precipitation amounts that occur over a twenty -four-hour period that have a recurrence interval of one, two, 10, and 100 years, respectively. STORMWATER — The flow of water which results from, and which occurs during and immediately following, a rainfall, snow- or ice-melt event. STORMWATER MANAGEMENT — Any measures taken to permanently reduce, or minimize the negative impacts of stormwater runoff quantity and quality after land development activities. STORMWATER RUNOFF — The waters derived from rains falling or snowmelt or ice melt occurring within a drainage area, flowing over the surface of the ground and/or collected in channels, watercourses or conduits. STREET RECONSTRUCTION — Removal and replacement of the road subgrade, where existing stormwater conveyance systems are modified. STRUCTURE — Any human-made object with form, shape and utility, either permanently or temporarily attached to, placed upon, or set into the ground, stream bed or lake bed. SUB-BASIN — A subdivision of a basin all of which drains to a single identifiable location. TMDL or TOTAL MAXIMUM DAILY LOAD — The amount of pollutants specified as a function of one or more water quality parameters that can be discharged per day into a water quality limited segment and still ensure attainment of the applicable water quality standard. The USEPA and WDNR approved report "Total Maximum Daily Loads for Total Phosphorus and Total Suspended Solids in the Rock River Basin" dated July 2011 specifies an annual percent reduction for pollutants necessary to meet the wasteload allocations assigned to the Village of Cottage Grove. UNNECESSARY HARDSHIP — That circumstance where special conditions, which were not self - created, affect a particular property and make strict conformity with regulations unnecessarily burdensome or unreasonable in light of the purposes of this chapter. VILLAGE — The Village of Cottage Grove. VILLAGE AGENT — The Erosion Control Officer, the Village Engineer, the Building Inspector or any other Village employee or official assigned or charged with the responsibility of administering and enforcing the requirements of this chapter or any independent contractor retained by the Village for such purpose. VILLAGE ENGINEER — The individual, or the individual's designee, or the firm, or a representative of the firm, appointed or retained by the Village Board to routinely provide engineering services for the Village. § 163-3. Scope of geographic coverage; exclusions. A. Within the Village. Unless specifically excluded herein, this chapter applies to all land-disturbing and land developing activities occurring within the corporate limits of the Village. B. Within the extraterritorial area. This chapter shall apply outside the Village limits within the extraterritorial plat review area provided by Chapter 236, Wis. Stats., but only to those land-disturbing activities relating to, arising from, or connected with a subdivision as defined in s. 236.02, Wis. Stats.(12) § 163-4. Technical standards and specifications. The design of all best management practices designed to meet the requirements of this chapter shall comply with the following technical standards: A. Natural Resources Conservation Service's "Wisconsin's Field Office Technical Guide, Chapter 4;" or its successor; B. Applicable construction erosion control standards by the Wisconsin Department of Natural Resources; C. Any other technical methodology approved by the Dane County Conservationist. § 163-5. Applicability of requirement for erosion control permits. Unless expressly exempted by § 163-7, an erosion control permit under § 163-9 shall be required and all construction site erosion control provisions of this chapter shall apply, to any of the following activities in Village of Cottage Grove; A. Land-disturbing activity in excess of 4,000 square feet; B. Land-disturbing activity on a slope of greater than 12%; C. Land-disturbing activity that involves the excavation or filling, or a combination of excavation and filling, in excess of 400 cubic yards of material; D. Land-disturbing activity that disturbs more than 100 lineal feet of road ditch, grass waterway or other land area where surface drainage flows in a defined open channel; including the placement, repair or removal of any underground pipe, utility or other facility within the cross-section of the channel; E. Any new public or private roads or access drives longer than 125 feet; F. Development that requires a subdivision plat, as defined in the applicable local land division ordinance(s); G. Land-disturbing activity that disturbs less than 4,000 square feet of land, including the installation of access drives, that the local approval authority determines to have a high risk of soil erosion or water pollution, or that may significantly impact a lake, stream, or wetland area. Examples of activities with a high risk of soil erosion or water pollution may include, but are not limited to, land disturbance on erodible soil or disturbance adjacent to lakes, rivers, streams or wetlands. All such determinations made by the local approval authority shall be in writing, unless waived by applicant. § 163-6. Applicability of requirement for stormwater control permits. Unless otherwise exempted by § 163-7, a stormwater control permit under § 163-9 shall be required and all stormwater management provisions of this chapter shall apply to any of the following activities within the Village of Cottage Grove: A. Any development(s) after August 22, 2001, that result(s) in the cumulative addition of 20,000 square feet of impervious surface to the site; B. Agricultural development that creates new impervious surface area exceeding 20,000 square feet on the site; C. Any development that requires a subdivision plat, as defined in applicable local land division ordinance(s); D. Any development that requires a certified survey map, as defined in the applicable local land division ordinance(s); for property intended for commercial or industrial use; E. Redevelopment, as defined in § 163-2. F. Other land development activities, including but not limited to redevelopment or alteration of existing buildings and other structures, that the local approval authority determines may significantly increase downstream runoff volumes, flooding, soil erosion, water pollution or property damage, or significantly impact a lake, stream, or wetland area. All such determinations shall be made in writing unless waived by the applicant. § 163-7. Exemptions and clarifications. A. Any activity directly related to the planting, growing and harvesting of agricultural crops is exempt from all requirements of this chapter; B. The following activities are exempt from the construction site erosion control provisions of § 163-5: (1) One- and two-family dwelling units regulated under the Wisconsin Uniform Dwelling Code. Land-disturbing activities in excess of one acre, or not associated with the construction of a dwelling, are not exempt from this chapter. (2) Projects specifically exempted from local erosion control ordinances under state or federal statute. It is the responsibility of the landowner to demonstrate such exemption with documentation acceptable to the local approval authority. (3) Municipal road or county highway project not exempted under § 163-7B(2) are exempt from § 163-11B(3) and (4) where all of the following conditions are met: (a) The purpose of the project is only to meet current state or federal design or safety guidelines; (b) All activity takes place within existing public right-of-way; (c) All other requirements of § 163-11 are met; and (d) The project does not include the addition of new driving lanes. C. The following activities are exempt from the infiltration standards described in § 163-11B(6): (1) Redevelopment sites. (2) New development sites with less than ten-percent-connected imperviousness based on complete development of the post-construction site, provided the cumulative area of all impervious surface is less than one acre. (3) Agricultural facilities and practices. (4) Areas where the infiltration rate of the soil is less than 0.6 inch/hour measured at the bottom of the proposed infiltration system where the soil layer is not easily removed or manipulated. (5) Expansion of roads. D. The following activities are exempt from the protective area requirements described in § 163-11B(7): (1) Redevelopment sites; (2) In-fill development areas of less than five acres; (3) Structures that cross or access surface waters, such as boat landings, bridges and culverts; (4) Structures constructed in accordance with s. 59.692(1v), Wis. Stats.; and (5) Post-construction sites from which runoff does not enter the surface water, except to the extent that vegetative ground cover is necessary to maintain bank stability. § 163-8. Preliminary review letter. A. A preliminary review letter provides a potential permit applicant with an initial simple evaluation of whether erosion and stormwater control standards can be met for a proposed site, lot layout, and/or construction design. This review is intended to assis t applicants in preparing general site plans and other submittals necessary to obtain an erosion control and stormwater permit. A preliminary review letter does not guarantee that an erosion or stormwater control plan will be approved or that a permit will be issued. Erosion and stormwater control plans and permit applications must meet all applicable standards and criteria for approval. B. A preliminary review letter shall be required for all activities requiring an erosion control or stormwater management permit under §§ 163-5 and 163-6. C. Application requirements. (1) A preliminary review letter must be submitted to and approved by the Village Engineer before an erosion control or stormwater management permit application may be submitted. (2) The following materials must be included in the preliminary review letter: (a) A narrative describing the proposed project. (b) A map showing the following information: [1] Location of the proposed project; [2] Limits of disturbed area; [3] Limits of impervious area; [4] Drainage area for each watershed area; and [5] Location and description of proposed stormwater facilities. (c) Preliminary runoff calculations which clearly demonstrate the adequacy of the proposed facilities and land that will be dedicated to stormwater management for meeting the standards of this chapter. D. Approval process. (1) The Village Engineer shall review the letter and determine whether erosion and stormwater control standards can be met for a proposed site, lot layout, and/or construction design. (2) Within 15 days of receiving the preliminary review letter, the Village Engineer shall either approve the preliminary plan or notify the applicant of any deficiencies. (3) The Village Engineer shall notify the applicant in writing of any deficiency in the preliminary plan and the applicant shall be given an opportunity to correct any deficiency. (4) Approval of a preliminary review letter does not guarantee that an erosion or stormwater control plan will be approved or that a permit will be issued. Erosion and stormwater control plans and permit applications must meet all applicable standards and criteria for approval. § 163-9. Erosion control and stormwater control permits and administration. A. No activity meeting the criteria described in §§ 163-5 and 163 -6 shall occur and no zoning permit may be issued until an erosion control and stormwater control permit is issued by the Village. B. The applicant must provide the following when requesting a permit: (1) Completed application form: (a) The application must be signed by the landowner, easement holder, or include a notarized statement signed by the landowner or easement holder authorizing the applicant to act as the landowner's or easement holder’s agent and bind the landowner to the terms of this chapter. (b) If a landowner or easement holder appoints an agent to submit an application pursuant to Subsection B(1) (a), the landowner or easement holder shall be bound by all of the requirements of this chapter and the terms of any permit issued to the agent. If the applicant is an easement holder or an agent of an easement holder, the applicant must provide the landowner notice and a copy of the permit application and all suppor ting documentation. The Village will provide the landowner with copies of all permits and notifications issued regarding permit applications. (2) Fees as required by § 163-15. (3) Copy of preliminary review letter, as described in § 163-8. (4) If required by § 163-5, an erosion control plan meeting all the standards of § 163-10A and C, or a simplified checklist as described in § 163-10B. (5) If required by § 163-6, a stormwater management plan meeting all of the standards of § 163-11 and a draft maintenance agreement as described in § 163-11A(8). (6) Copies of permits or permit applications or approvals required by any other governmental entity. (7) A proposed timetable and schedule for completion and installation of all elements of approved erosion control and stormwater management plans and a detailed schedule for completion of construction. (8) An estimate of the cost of completion and installation of all elements of the approved erosion control and stormwater management plans. (9) Evidence of financial responsibility to complete the work proposed in the plan. For major land- disturbing activities, the applicant shall provide, prior to issuance of the permit, an irrevocable letter of credit, certificate of deposit or certified check to the Village in an amount equal to 125% of the estimated cost of all required control measures as determined by the Village Engineer. The security deposited shall guarantee that all required control measures will be taken or installed according to the approved plan. The security shall remain in full force until released by the Village Board, and only after an inspection by the Village Engineer assures that all required control measures have been fully and satisfactorily completed. The Village shall have the right to draw upon the security for purposes of obtaining compliance with the approved control plan as it deems necessary. If the erosion and runoff control requirements of this chapter are included as part of plat or certified survey map conditions of approval, then, security for performance of the control requirements may be included as part of the overall security required for installation of improvements under Chapters 23, 274 and 325 of the Village Ordinances. C. Approval process. (1) Major land-disturbing activities. (a) The Village Engineer shall verify that the permit application is complete under § 163-9B and review the plan(s) for compliance with the standards identified in §§ 163-10 and 163- 11. The Village may request additional information at any time to determine ordinance compliance. (b) The Village Engineer shall either approve the submitted plan or notify the applicant in writing of any deficiencies, within 30 days of receipt of the control plan. Staff engaged in this review and approval process shall be certified where appropriate by the Wisconsin Department of Safety and Professional Services for this purpose. (2) Minor land-disturbing activities. (a) The Village Agent shall verify the permit application is complete under § 163-9B and review the plan for compliance with this chapter in accordance with the Erosion Control Checklist attached hereto and incorporated herein as Exhibit A2 established by the Village Engineer and approved by the Village Board. The Village may request additional information at any time to determine ordinance compliance. (b) The Village Agent shall approve, reject or conditionally approve the plan within the same number of working days as required for issuance of a building permit, but in no event more than three working days after receipt of the completed control plan statement. If the control plan statement is rejected or conditionally approved, the applicant shall be informed, in writing, of the reasons for rejection or conditions of approval. Staff engaged in this review and approval process shall be certified where appropriate by the Wisconsin Department of Safety and Professional Services for this purpose. (3) Where installed stormwater practices will be privately owned, an affidavit which describes the property by legal description, notifying future prospective purchasers of the existence of a stormwater permit (which is on file at Village Hall) issued under th is chapter and applicable plan, timetables and potential liability imposed by § 163-16C for failure to bring the property into compliance with this chapter after notification, shall be recorded with the Dane County Register of Deeds prior to issuance of an erosion and stormwater control permit. The foregoing information shall also be noted on every plat and certified survey map. (4) Upon approval of the Village Engineer, the erosion control or stormwater management permit shall be issued by the Village after the applicant has met all other requirements of this chapter. D. Permit conditions. (1) The plan shall be implemented prior to the start of any land -disturbing activity and shall be maintained over the duration of the project. Stormwater components of the plan shall be maintained in perpetuity. (2) The permittee is responsible for successful completion of the erosion control plan and the stormwater management plan. The permittee shall be liable for all costs incurred, including environmental restoration costs, resulting from noncompliance with an approved plan. (3) Application for a permit shall constitute express permission by the permittee and landowner for the Village Agent to enter the property for purposes of inspection under Subsection E or curative action under § 163-16C. The application form contains a prominent provision advising the applicant and landowner of this requirement. (4) All incidental mud-tracking off site onto adjacent public thoroughfares shall be cleaned up and removed by the end of each working day using proper disposal methods. (5) A copy of the approved permit and erosion control plan shall be kept on the project site, in a place readily accessible to contractors, engineers, local approval authority inspection staff and other authorized personnel. E. Inspections. (1) Application for a permit under this chapter shall constitute permission by the applicant and 2. Editor's Note: Said exhibit is on file in the Village offices. landowner for the Village Agent to enter upon the property and inspect during the construction phase prior to the inspections pursuant to Subsection E(4) and (6), as necessary to confirm compliance with the requirements of this chapter. (2) As part of the plan approval process, the Village Agent shall determine the minimum number of inspections required to assure compliance. The site of any regulated land-disturbing activity shall be inspected once every 30 days, or more frequently as determined by the Village Engineer during the construction phase with assistance from the Erosion Control Officer and/or Building Inspector. The Village Agent's compliance inspections do not relieve the permittee from performing and documenting their own inspections required by ch. NR 151, Wis. Adm. Code. (3) Within 10 days after installation of all practices in an approved erosion control plan and achievement of soil stabilization, the permittee shall notify the Village Clerk and Erosion Control Officer. The permittee shall inspect the site weekly and prior to every forecasted rain fall of ½ inch or greater. (4) The Village Agent shall inspect the property to verify compliance with the erosion control plan within 10 days of notification of soil stabilization. (5) Within 10 days after installation of all practices in an approved stormwater management plan, the permittee shall notify the Village Clerk and submit drawings documenting construction. The person who designed the stormwater management plan for the permittee shall submit as -built certification to ensure that constructed stormwater management practices and conveyance systems comply with the specifications included in the approved plans. At minimum, as-built certification shall include a set of drawings comparing the approved stormwater management plan with what was constructed. Other information shall be submitted as required by the Village Engineer, Building Inspector, or Erosion Control Officer. (6) The Village Agent shall inspect the property to verify compliance within 10 days of notification. (7) Maintenance is the responsibility of the owner, and facilities are subject to inspection and orders for repairs. F. Permit transfers. (1) The affidavit [required in § 163-9C(3)] describing the property by legal description and notifying future prospective purchasers of the existence and responsibilities associated with the stormwater permit on file at Village Hall runs with the property. (2) The permittee may not transfer interest in property subject to an approved plan prior to completion of the proposed steps to attain soil stabilization without Village approval. (3) When a permittee and landowner transfers ownership, possession or control of real estate subject to either or both an uncompleted erosion control or stormwater management plan, the successor in interest to any portion of the real estate shall be responsible to control soil erosion and runoff and shall comply with the minimum standards provided in this chapter. (4) When ownership, possession or control of property subject to an uncompleted erosion control or stormwater management plan, or both, is transferred, the former owner (seller) shall notify the new owner (buyer) as to the current status of compliance with notice to the authority, and provide a copy of the erosion control plan or stormwater management plan, or both. (5) Transfers of interest in real estate subject to an approved, uncompleted plan may be conducted consistent with this chapter under any of the following arrangements: (a) The transferee shall file a new, approved erosion control or stormwater management plan, or both, with the authority; (b) The transferee shall obtain an approved assignment from the authority as sub-permittee to complete that portion of the approved plan regulating soil erosion and runoff on the transferee's property. (c) The permittee shall provide the authority with a duly completed and executed continuing surety bond or certified check in an amount sufficient to complete the work proposed in the approved plan; at the time of transfer, the permittee may seek to reduce the surety bond or certified check to the appropriate amount to complete remaining work. If the transferor enters into escrow agreements with transferees to complete an approved plan, these funds shall be available to the authority to attain plan compliance. When an approved erosion control plan and, if required, a stormwater management plan is or ar e not completed as proposed, the authority may use the surety bond to complete remaining work to achieve plan compliance. G. Plan or permit amendments. Any proposed modifications to approved plans, construction schedules or alterations to accepted sequencing of land-disturbing site activities shall be approved by the Village Engineer in consultation with the Erosion Control Officer or Building Inspector prior to implementation of said changes. One permit revision is allowed at no charge. The second and subsequent revisions, to a maximum of five revisions, cost $50 each. H. Timeframe and Expiration. (1) Erosion control plan construction must begin within one year from date of filing a complete application. (2) Except as otherwise specified, all permit applications will expire the sooner of: (a) One year after the applicant is notified of, but does not adequately address, a deficiency; or (b) Three years from date of filing a complete application. (3) Erosion control permits will expire the sooner of: (a) Upon the stabilization date in the approved plan; or (b) three years after permit issuance. § 163-10. Erosion control plan requirements. A. The erosion control plan shall meet the more stringent requirements between those identified in this chapter and those identified in the most current version of Dane County erosion control ordinance requirements. B. Plan materials. Erosion control plans required under § 163-5 may include consideration of adjoining landowners' cooperative efforts to control transport of sediment and, except as specifically exempted below, shall include at a minimum the following information: (1) Property lines, lot dimensions, and limits of disturbed area, including areas within five (5) feet of the property line; (2) Limits of impervious area, including buildings. Include all public and private roads, interior roads, driveways and parking lots, and indicate type of paving and surface material; (3) All natural and artificial water features including, but not limited to, lakes, ponds, streams (including intermittent streams), and ditches; and areas of natural woodland or prairie. The plan must show ordinary high-water marks of all navigable waters, one-hundred-year flood elevation and delineated wetland boundaries. A certified flood zone determination and/or wetland delineation may be required at the applicant's expense; (4) Cross sections of and profiles of channels, swales and road ditches; (5) Culvert sizes; (6) Direction of flow of runoff; (7) Watershed size for each drainage area; (8) Design discharge for ditches and structural measures; (9) Runoff velocities; (10) Fertilizer and seeding rates and recommendations; (11) Time schedules for stabilization of ditches and slopes; (12) Description of methods by which sites are to be developed and a detailed land disturbance schedule including time schedules for stabilization of ditches and slopes; (13) Provision for sequential steps mitigating erosive effect of land -disturbing activities to be followed in appropriate order and in a manner consistent with accepted erosion control methodology suitable to proposed sites and amenable to prompt revegetation, including runoff calculations as appropriate; (14) Provisions to prevent mud -tracking off site onto public thoroughfares during the construction period; (15) Provisions to prevent the discharge of sediment from dewatering activities; (16) Provisions to disconnect impervious surfaces, where feasible; (17) Provisions to prevent sediment delivery to, and accumulation in, any proposed or existing stormwater conveyance systems (both on-site and off-site); (18) Copies of permits or permit applications required by any other unit of government or agency; (19) Existing and proposed elevations (referenced to the North American Vertical Datum of 1988) and existing and proposed contours in the area, where deemed necessary. (20) Any other information necessary to reasonably determine the location, nature and condition of any physical or environmental features of the site; (21) Provisions to prevent the transport by runoff of chemicals, cement and other building compounds and materials on the construction site during the construction period; (22) Areas of natural woodland or prairie. C. Simplified plan checklist. For minor land-disturbing activities, as defined in § 163-2, applicants may submit erosion control proposals using simplified checklists of standard erosion control practices, on a standard form established by the Village Engineer and approved by the Village Board and a simple map and site development schedule. Simplified plan checklists shall be reviewed by the Village Agent for completeness and accuracy. D. Erosion control performance standards. (1) Proposed design, suggested location and phased implementation of effective, practicable erosion control measures for plans shall be designed, engineered and implemented to achieve the following results: (a) Prevent gully and bank erosion; (b) Limit total off-site permissible annual aggregate soil loss for exposed areas resulting from sheet and rill erosion to an annual, cumulative soil loss rate not to exceed five tons per acre annually; and (c) Discharges from new construction sites must have a stable outlet capable of carrying designed flow as required in § 163-11B(4), at a nonerosive velocity. Outlet design must consider flow capacity and flow duration. This requirement applies to both the site outlet and the ultimate outlet to stormwater conveyance or waterbody. (d) Prevent or reduce all of the following: 1. The depositing of soil from being tracked onto streets by vehicles. 2. The discharge of sediment from disturbed areas into on-site storm water inlets. 3. The discharge of sediment from disturbed areas into adjacent waters of the State of Wisconsin. 4. The discharge of sediment from drainage ways that flow off the site. 5. The discharge of sediment by dewatering activities. 6. The discharge of sediment eroding from soil stockpiles existing for more than 7 days. 7. The transport by runoff chemicals, cement, and other building compounds and materials on a construction site during construction. (2) Plan compliance under Subsection C(1) shall be determined using the Wisconsin Department of Natural Resources' Construction Site Soil Loss and Sediment Discharge Calculation Guidance (effective June 2015 or current version),or another commonly accepted soil erosion methodology approved by the Dane County Conservationist, that considers season of year, site characteristics, soil erodibility and slope. (3) Erosion control measures for plan approval need not attempt to regulate soil transportation within the boundaries of the applicant's site. (4) Implementation. Permittees shall implement BMPS as follows: (a) Erosion and sediment control practices shall be constructed or installed before land disturbing activities begin. (b) Erosion and sediment control practices must be maintained until final stabilization. (c) Final s activity shall commence when land disturbing activity ceases and final grade has been reached on any portion of the site. (d) Temporary stabilization activity shall commence when land disturbing activity has temporarily ceased and will not resume for a period exceeding 14 calendar days. (e) BMPs that are no longer necessary for erosion and sediment control must be removed. (5) Grading within (5) feet of property line. Except as authorized in this section, the topography within five (5) feet of any property line shall remain unchanged during development. (a) When land disturbing activity associated with development occurs within five (5) feet of any property line, finished grades in that area shall be restored to the topography in existence before the land disturbing activity began. A positive slope of one-half (1/2) inch vertical per one (1) foot horizontal within five (5) feet of the property line is allowed to provide proper drainage away from a one or two family residence. (b) The established grade of the adjoining property shall determine the finished grade at the property line for any development. The owner of the property under development bears the burden of proof as to the established grade at the property line and the topo graphy within five (5) feet of the property line. (c) Existing drainage ways and drainage easements along property lines shall be maintained including, but not limited to, natural watercourses and stormwater management areas shown on plats and certified survey maps. (d) Development in Floodplain Districts requiring fill to comply with Village ordinances is exempt from this subsection. (e) The director may authorize grading resulting in changes to the existing topography at and within five (5) feet of any property line, if the applicant establishes the following: 1. The intent of the grading and an explanation of its necessity, and 2. Stormwater runoff will not negatively affect adjacent properties. § 163-11. Stormwater management plan requirements. A. Any stormwater management plan must meet the more stringent requirements between those identified in this Chapter and those identified in the most current Dane County requirements. B. Plan materials. Stormwater management plans shall satisfy all of the requirements in Subsection B, and shall address at a minimum the following information: (1) A narrative describing the proposed project, including implementation schedule for planned practices; (2) Identification of the entity responsible for long-term maintenance of the project; (3) A map showing drainage areas for each watershed area; (4) A summary of runoff peak flow rate calculations, by watershed area, including: (a) Preexisting peak flow rates; (b) Post-construction peak flow rates with no detention; (c) Post-construction peak flow rates with detention; (d) Assumed runoff curve numbers (RCNs); and (e) Time of concentration (Tc) used in calculations. (5) A complete site plan and specifications, signed by the person who designed the plan. All plans shall be drawn to an easily legible scale, shall be clearly labeled, and shall include, at a minimum, all of the following information: (a) Property lines and lot dimensions; (b) All buildings and outdoor uses, existing and proposed, including all dimensions and setbacks; (c) All public and private roads, interior roads, driveways and parking lots. Show traffic patterns and type of paving and surfacing material; (d) All natural and artificial water features, including, but not limited to, lakes, ponds, streams (including intermittent streams), and ditches. Show ordinary high -water marks of all navigable waters, one-hundred-year flood elevations and delineated wetland boundaries, if any. If not available, appropriate flood zone determination or wetland delineation, or both, may be required at the applicant's expense; (e) Protective areas as defined in Subsection B(7)(a); (f) Depth to bedrock; (g) Depth to seasonal high-water table; (h) The extent and location of all soil types as described in the Dane County Soil Survey, slopes exceeding 12%, and areas of natural woodland or prairie; (i) Existing and proposed elevations (referenced to the North American Vertical Datum of 1988, where available) and existing and proposed contours in the area requiring a grading and filling permit; (j) Elevations, sections, profiles, and details as needed to describe all natural and artificial features of the project; (k) Soil erosion control and overland runoff control measures, including runoff calculations as appropriate; (l) Detailed construction schedule; (m) Copies of permits or permit applications required by any other governmental entities or agencies; (n) Any other information necessary to reasonably determine the location, nature and condition of any physical or environmental features; (o) Location of all stormwater management practices; (p) All existing and proposed drainage features; (q) The location and area of all proposed impervious surfaces; and (r) The limits and area of the disturbed area. (6) Engineered designs for all structural management practices; (7) A description of methods to control oil and grease or written justification for not providing such control; (8) A maintenance plan and schedule for all permanent stormwater management practices as recorded on the affidavit required in § 163-9C(3). (9) If necessary, a description and plans to control temperature of runoff. (10) A summary of infiltration calculations including: (a) Pre-development infiltration volume. (b) Calculated infiltration volume goal. (c) Achieved post-development infiltration volume. (11) Flood elevation for a 200-year design storm and proposed minimum opening elevation. C. Stormwater management performance standards. Proposed design, suggested location and phased implementation of effective, practicable stormwater management measures for plans shall be designed, engineered and implemented to achieve the following results: (1) Sediment control. (a) For new development, design practices to retain soil particles greater than five microns on the site resulting from a one -year twenty-four-hour storm event (2.5 inches over twenty - four-hour duration), according to approved procedures, and assuming no sediment resuspension; or design practices to achieve an eighty-percent reduction in sediment loads based on average annual rainfall.* [1] For new development, design practices to achieve a fifty-four-percent reduction in total phosphorus loads based on average annual rainfall. (b) For redevelopment resulting in exposed surface parking lots and associated traffic areas, design practices to achieve the following reductions in sediment loads based on average annual rainfall: 55% for sites within the Koshkonong watershed, and 62% for sites within the Yahara watershed. [1] For redevelopment resulting in exposed surface parking lots and associated traffic areas, design practices to achieve a 54% reduction in total phosphorus loads based on average annual rainfall. [2] Under no circumstances shall the site's existing sediment or phosphorus control level or trapping efficiency be reduced as a result of the redevelopment. [3] Note: the 80% reduction based on average annual rainfall standard and the five - micron particle trapping standard are considered generally equivalent. (2) Oil and grease control. For all stormwater plans for commercial or industrial developments and all other uses where the potential for pollution by oil or grease, or both, exists, the first 0.5 inch of runoff will be treated using the best oil and grease removal technology available. This requirement may be waived by the plan reviewer only when the applicant can demonstrate that installation of such practices is not necessary. (3) Runoff rate control, hydrologic calculations. All runoff calculations shall be according to the methodology described in the Natural Resources Conservation Service's Technical Release 55, "Urban Hydrology for Small Watersheds" (commonly known as TR-55), or other methodology approved by the Dane County Conservationist. The maximum runoff curve number (RCN) used in such calculation shall be the TR-55 specified curve numbers for other land uses shall be used for predevelopment conditions. For post-development conditions, heavily disturbed sites will be lowered one permeability class for hydrologic calculations. Lightly disturbed areas require no modification. Where practices have been implemented to restore soil structure to predeveloped conditions, no permeability class modification is required. Table 1 - Maximum Predevelopment Runoff Curve Numbers Runoff Curve Number Hydrologic Soil Group* A B C D Woodland 30 55 70 77 Grassland 39 61 71 78 Cropland 51 68 78 83 NOTE: * When dual HSGs are specified, the drained condition shall be assumed. (4) Runoff rate control, design standards. Hydrologic analyses shall utilize the MSE4 NRCS rainfall distribution. Except for redevelopment projects, all stormwater facilities shall be designed, installed and maintained to effectively accomplish the following: (a) Maintain predevelopment peak runoff rates for the one-year, twenty-four-hour storm event (2.49 inches over 24 hours' duration). (b) Maintain predevelopment peak runoff rates for the two-year, twenty-four-hour storm event (2.84 inches over 24 hours' duration). (c) Maintain predevelopment peak runoff rates for the ten-year, twenty-four-hour storm event (4.09 inches over 24 hours' duration). (d) Maintain predevelopment peak runoff rates for the one -hundred-year, twenty -four-hour storm event (6.66 inches over 24 hours' duration). (e) Maintain predevelopment peak runoff rates for a two-hundred year, twenty four hour storm event (7.53 inches over 24 hours’ duration). (5) Outlets. Discharges from new construction sites must have a stable outlet capable of carrying designed flow as required in Subsection B(4), at a nonerosive velocity. Outlet design must consider flow capacity and flow duration. This requirement applies to both the site outlet and the ultimate outlet to stormwater conveyance or water body. (6) Infiltration. (a) For both residential and nonresidential developments, design practices to infiltrate sufficient runoff volume so that post-development infiltration volume shall be at least 90% of pre-development infiltration volume, based on average annual rainfall. (b) If, when designing appropriate infiltration systems, more than 2% of the site is required to be used as effective infiltration area, the applicant may alternately design infiltration systems and pervious surfaces to meet or exceed the annual predevelopment recharge rate. The annual predevelopment recharge rate shall be determined from the Wisconsin Geological and Natural History Survey's 2009 Report, Groundwater Recharge in Dane County, Estimated by a GIS-Based Water-Balanced Model, or subsequent updates to this report, or by a site -specific analysis using other appropriate techniques. If this alternative design approach is taken, at least 2% of the site must be used for infiltration. (c) Pretreatment. Before infiltrating runoff, pretreatment shall be required for parking lot runoff and for runoff from new road construction in commercial, industrial and institutional areas that will enter an infiltration system. The pretreatment shall conform to the design standards in section 163-4 and designed to protect the infiltration system from clogging prior to scheduled maintenance and to protect groundwater quality. (d) Separation distances. Infiltration practices shall be located so that the characteristics of the soil and the separation distance between the bottom of the infiltration system and the elevation of seasonal high groundwater or the top of competent bedrock are shown in Table 2. Table 2 Source Area Separation Distance Soil Characteristics Industrial, Commercial, Institutional, Parking Lots, and Roads 5 feet or more Filtering layer Residential arterial roads 5 feet or more Filtering layer Roofs draining to subsurface infiltration practices 1 foot or more Native or engineered soil with particles finer than coarse sand Roofs draining to surface infiltration practices Not applicable Not applicable All other impervious source areas 5 feet or more Filtering layer (e) Prohibitions. Notwithstanding Subsection B(6)(a) through (c), infiltration systems may not be installed in any of the following areas: [1] Areas associated with Tier 1 industrial facilities identified in s. NR 216.21(2)(a), Wis. Admin. Code, including storage, loading, rooftop and parking. [2] Storage and loading areas of Tier 2 industrial facilities identified in s. NR 216.21(2)(b). Wis. Admin. Code. [3] Fueling and vehicle maintenance areas. [4] Areas within 1,000 feet up gradient or within 100 feet down gradient of karst features or direct conduits to groundwater. [5] Areas with less than three feet separation distance from bottom of the infiltration system to the elevation of seasonal high groundwater or the top of bedrock, except that this provision does not prohibit infiltration of roof runoff. [6] Areas with runoff from industrial, commercial and institutional parking lots and roads and residential arterial roads with less than five feet separation distance from the bottom of the infiltration system to the elevation of seasonal high groundwater or the top of bedrock. [7] Areas within 400 feet of a community water system well as specified in s. NR 811.16(4), Wis. Admin. Code, for runoff infiltrated from commercial, industrial and institutional land uses or regional devices for residential development. [8] Areas where contaminants of concern, as defined in s. NR 720.03(2), Wis. Admin. Code, are present in the soil through which infiltration will occur. [9] Any area where the soil does not exhibit one of the following characteristics between the bottom of the infiltration system and the seasonal high groundwater and top of bedrock: at least a five-foot soil layer with 10% fines or greater. This provision does not apply where the soil medium within the infiltration system provides an equivalent level of protection and does not prohibit infiltration of roof runoff. (f) Alternate use of runoff. Where alternate uses of runoff are employed, such as flushing, laundry or irrigation, such alternate use shall be given equal credit toward the infiltration volume required by this section. (g) Minimizing groundwater pollution. According to ch. NR 151, Wis. Admin. Code, infiltration systems designed in accordance with this section shall, to the extent technically and economically feasible, minimize the level of pollutants infiltrating to groundwater and shall maintain compliance with the preventive action limit at a point of standards application in accordance with ch. NR 140, Wis. Admin. Code. However, if site -specific information indicates that compliance with the preventive action limit is not achi evable, the infiltration system may be not installed or shall be modified to prevent infiltration to the maximum extent practicable. (h) The maximum pre -development runoff curve number (RCN) used in such calculations shall be those shown in Table 1. (7) Protective areas. (a) All sites, except those exempted under § 163-7D, shall be designed to maintain a protective area of the following minimum protective area widths: [1] For outstanding resource waters and exceptional resource waters, and for wetlands in areas of special natural resource interest as specified in s. NR 103.04, 75 feet. [2] For perennial and intermittent streams identified on a United States geological survey 7.5-minute series topographic map, or a county soil survey map, whichever is more current, 50 feet. [3] For lakes, 50 feet. [4] For highly susceptible wetlands, 50 feet. Highly susceptible wetlands include the following types: fens, sedge meadows, bogs, low prairies, conifer swamps, shrub swamps, other forested wetlands, fresh wet meadows, shallow marshes, deep marshes and seasonally flooded basins. Wetland boundary delineations shall be made in accordance with s. NR 103.08(1m). This subsection does not apply to wetlands that have been completely filled in accordance with all applicable state and federal regulations. The protective area for wetlands that have been partially filled in accordance with all applicable state and federal regulations shall be measured from the wetland boundary delineation after fill has been placed. [5] For less susceptible wetlands, 10% of the average wetland width, but no less than 10 feet, nor more than 30 feet. Less susceptible wetlands include degraded wetlands dominated by invasive species such as reed canary grass; cultivated hydric soils; and any gravel pits, dredged material or fill material disposal sites that take on the attributes of a wetland. [6] For concentrated flow channels with drainage areas greater than 130 acres, 10 feet. [7] In Subsection B(7)(a)[1], [4] and [5], determinations of the extent of the protective area adjacent to wetlands shall be made on the basis of the sensitivity and runoff susceptibility of the wetland in accordance with the standards and criteria in s. NR 103.03, Wis. Adm. Code. (b) The following requirements shall be met in protective areas: [1] Impervious surfaces shall be kept out of the protective area to the maximum extent practicable. The stormwater management plan shall contain a written site -specific explanation for any parts of the protective area that are disturbed during construction. [2] Where land -disturbing construction activity occurs within a protective area, and where no impervious surface is present, adequate sod or self -sustaining vegetative cover of 70% or greater shall be established and maintained. The adequate sod or self- sustaining vegetative cover shall be sufficient to provide for bank stability, maintenance of fish habitat and filtering of pollutants from upslope overland flow areas under sheet flow conditions. Nonvegetative materials, such as rock riprap, may be employed on the bank as necessary to prevent erosion, such as on steep slopes or where high velocity flows occur. [3] Best management practices, such as filter strips, swales, or wet detention basins, that are designed to control pollutants from nonpoint sources may be located in the protective area. D. Stormwater management goals. The following standards shall be met whenever possible, and proposed design, suggested location and implementation of practices to meet these goals shall be included in plans: (1) For existing development, design practices to retain soil particles greater than 40 microns on the site (twenty -percent reduction) resulting from a one -year twenty -four-hour storm event, according to approved procedures, and assuming no sediment resuspension. (2) For street reconstruction, design practices to retain soil particles greater than 20 microns on the site (forty-percent reduction) resulting from a one-year, twenty-four-hour storm event, according to approved procedures, and assuming no sediment resuspension. E. Control measures. All water runoff control measures shall require approval of the Village Engineer. Control measures may include, but are not limited to, infiltration basins, detention ponds, and swales. In addition to the following technical standards referred to in § 163-4, control measures installed within the Village must be designed and constructed according to the following standards: (1) All slopes shall be at least 4:1 or flatter (four feet horizontal to one foot vertical). § 163-12. Regulations for lands or activities not otherwise subject to this chapter. Notwithstanding any other provisions of this chapter, it shall be a violation of this chapter for any person to create, permit, establish, maintain or allow to be maintained any condition or activity that causes excessive runoff or erosion to adjacent land, public streets or water bodies. Penalties and remedies may be sought for such activities as provided in § 163-17. Erosion and runoff is excessive when in the opinion of the Village Engineer or Building Inspector an unsafe condition results in the streets, sedimentation occurs in lakes and streams, environmentally sensitive lands are threatened, runoff endangers downstream property, or the public health, safety or general welfare of the citizens of the Village of Cottage Grove is otherwise threatened or harmed. § 163-13. Off-site stormwater management. A. When the Village Board determines, based on a drainage study conducted and prepared by a qualified professional engineer, that off-site water runoff control measures best serve the interests of the public and the environment, then the Board may allow or require off-site water runoff control as a condition of approval of a land disturbance permit. When off -site water runoff control is permitted or required as specified in § 163-11B(4), prior to final approval by the Board, the permit applicant shall obtain written permission from any and all property owners who would experience increases in the amount of water runoff entering their land from a two-, a ten-, or a one-hundred-year, twenty-four-hour design storm or whose property is threatened by virtue of additional soil saturation. The Village Board will act on behalf of any and all affected public lands, public drainageways, storm sewers or other public waterways. B. Developments served by off -site stormwater management facilities will be charged a fee -in-lieu of detention. Fees-in-lieu will be set by the Village and based on the level of service provided to the applicant by the off-site facility. C. Off-site stormwater management is only allowed when all of the following conditions for the off-site facility are met: (1) The facility is in place; (2) The facility is designed and adequately sized to provide a level of stormwater control that at least meets the ordinance standards; (3) The facility has a legally obligated entity responsible for its long-term operation and maintenance. D. Permit applicants may be required to install and maintain temporary facilities designed to meet the standards of this chapter, if an off-site facility that will serve the proposed development is planned but does not yet meet the conditions of Subsection C. Temporary facilities must be maintained by the applicant until that time that the off -site facility meets the conditions of Subsection C. Applicants required to install and maintain temporary facilities will also be charged a fee-in-lieu. § 163-14. Appeals; variances. A. Appeals. (1) Any person aggrieved by any decision of the Village Agent pursuant to this chapter may appeal to the Zoning Board of Appeals. Such appeal shall be taken within 30 days after the challenged decision. Notice of appeal setting forth the specific grounds for the appeal shall be filed with the Village Clerk. A fee of an amount set by the Village in the annual fee schedule resolution must accompany any appeal request involving a land -disturbing activity. The Zoning Administrator shall forthwith transmit to the Zoning Board of Appeals the reco rd upon which the action appealed from was taken. (2) The Zoning Board of Appeals shall publish a Class 2 notice thereof under ch. 985, Wis. Stats., as well as give due notice to the parties in interest. The Board shall hear and decide variance and appeal requests within 30 days of receipt of written request and payment of the appeal fee. Upon the hearing any party may appear in person or by agent or attorney. (3) The Zoning Board of Appeals may, in conformity with the provisions of this chapter, reverse or affirm, wholly or partly, or modify the order, requirement, decision or determination appealed from and may make such order, requirement decision or determination as ought to be made, and shall have all the powers of the officer from whom the appeal is taken. (4) The concurring vote of a majority of the Zoning Board of Appeals shall be necessary to reverse the decision of the Village Engineer. B. Variances. (1) An applicant may include in the application a request for a variance from the requirements of § 163-10 or § 163-11. No variance shall be granted unless the applicant demonstrates and the Village Engineer, in consultation with the Zoning Administrator, finds that all of the following conditions are present: (a) Enforcement of the standards set forth in this chapter will result in unnecessary hardship to the landowner; (b) The hardship is due to exceptional physical conditions unique to the property; (c) Granting the variance will not adversely affect the public health, safety or welfare, nor be contrary to the spirit, purpose and intent of this chapter; (d) The project will have no impact upon any of the stated purposes of this chapter as set forth in § 163-1C; (e) The applicant has proposed an alternative to the requirement from which the variance is sought that will provide equivalent protection of the public health, safety and welfare, the environment and public and private property; (f) The net cumulative effect of the variance will not impact downstream conditions; and (g) Existing regional facilities are shown to meet the performance standards of this chapter. (2) If all of the conditions set forth in Subsection B(1) are met, a variance may only be granted to the minimum extent necessary to afford relief from the unnecessary hardship, with primary consideration to water quality. (3) A variance from the provisions of § 163-11B(1) and (2) may only be granted if: (a) The applicant has met the requirements of § 163-14B(1); and (b) The applicant will be denied all reasonable and beneficial use of the property if the variance is denied. (4) A person aggrieved by a variance determination by the Village Engineer and/or Zoning Administrator may appeal the decision to the Zoning Board of Appeals pursuant to Subsection B(1). (5) A person aggrieved by a decision of the Zoning Board of Appeals regarding a variance may appeal that decision to Dane County Circuit Court. § 163-15. Permit fees. A. Major. The application fee for a major land -disturbing activity permit shall be an amount set by Village in the annual fee schedule resolution, of which a portion will cover administration and inspections, and the remainder will be a deposit which is refundable unless violations occur and have to be taken care of by the Village. In addition to this fee, before any permit will be issued, the applicant must pay the actual engineering fees or expenses incurred by the Village in connection with review of the control plan and the engineering fees or expenses estimated to be incurred for on -site inspection during the project. Where plat or certified survey map review fees are paid pursuant to Chapters 23, 274 and 325 of the Village Ordinances for the same project covered by the proposed land-disturbing activity permit, then the application fee will be waived. Where the application fee is waived, the applicant must still pay engineering and inspection fees and expenses; however, such fees and expenses shall not be duplicative of any engineering or inspection fees paid in connection with plat or certified survey map approval. B. Minor. The application fee for a minor land -disturbing activity permit shall be an amount set by the Village in the annual fee schedule resolution, of which a portion will cover administration and inspections, and the remainder will be a deposit, which is refundable unless violations occur and have to be taken care of by the Village. C. Village activity. No permit or fees are required for Village activity. D. The permit fee shall be payable at the time an application for either an erosion control or a stormwater management permit, or both, is submitted. § 163-16. Enforcement. A. Stop-work order. (1) Whenever the Village Agent finds any noncompliance with the provisions of this chapter, the Village Agent shall attempt to communicate with the owner or person performing the work to obtain immediate and voluntary compliance if such person is readily avail able. If the owner or person performing the work is not readily available, that person refuses to voluntarily comply immediately or the noncompliance presents an imminent danger or will cause or threatens to cause bodily injury or damage to off -site property, including, but not limited to off -site runoff, the Village Agent shall post in a conspicuous place on the premises, a stop -work order which shall cause all activity not necessary to correct the noncompliance to cease until noncompliance is corrected. (2) The stop -work order shall provide the following information: date of issuance, an adequate identification of the property subject to the stop-work order, reason for posting and the signature of the inspector posting the card. (3) It shall be a violation of the chapter for the unauthorized removal of the stop -work order from the premises. B. In addition to posting a stop-work order, the Village Agent shall provide notification to the owner or contractor by personal service, written notice by certified mail, or facsimile transmission. (1) The permittee, landowner and contractor shall have 24 hours from the time and date of notification by the Village Agent to correct any noncompliance with the plan when notification is by either personal communication of noncompliance to the owner or contractor or their respective agents or written notice sent by certified mail to the owner or contractor. (2) If notice is not provided under Subsection B(1) the permittee and landowner shall have 72 hours to correct any noncompliance with the plan when notification is by posting notice in a conspicuous place on the site or sending notice by facsimile transmission to owner or contractor. C. If any noncompliance is not corrected within the time periods specified in Subsection B(1) or (2), the permittee and landowner authorize the Village Agent to take any action, to perform any work, or commence any operations necessary to correct conditions upon the subject property where notice of noncompliance has been issued to bring the property into conformance with plan requirements. The permittee and landowner further consent to reimburse the authority for the total costs and expenses of the aforementioned actions ; said reimbursement may be collected as a special charge upon the property for current services rendered as provided by law. D. If the permittee has filed an appeal under § 163-14A prior to the expiration of the time for compliance under § 163-16B, the Village Agent may take action, perform work or correct conditions only to the extent necessary to protect against or correct an imminent hazard or a condition that will cause or threatens to cause personal injury or damage to off-site property. E. Revocation of permit. Where a stop-work order has been issued in order to obtain compliance with a control plan and the permittee does not cease the illegal activity or obtain compliance with the control plan or permit conditions within the time period specified in Subsection B(1) or (2), the Village may revoke the permit issuance of the stop -work order. Permits for major land-disturbing activities may be revoked by the Village Engineer or his designee; permits for minor land-disturbing activities may be revoked by the Erosion Control Officer, Building Inspector or Village Engineer. F. Private remedies preserved. These enforcement provisions are not intended in any way to restrict or limit the rights of private parties to pursue whatever private legal remedies they may have available as a result of any erosion, sediment or water runoff. § 163-17. Violations and penalties. A. Any person or persons, firm, company or corporation, owner, occupant or other user of the premises who violates, disobeys, omits, neglects or refuses to comply with or resists the enforcement of any of the provisions of this chapter shall be subject to a forfeiture of not less than $200 nor more than $2,000 plus the actual costs of prosecution for each offense for major land -disturbing activities, and not less than $50 nor more than $500, plus the actual costs of prosecutions of each offense, for minor land -disturbing activities. Each day that a violation exists shall constitute a separate offense. B. Any person who has the ability to pay any forfeiture entered against him or her under this chapter but refuses to do so may be confined in the county jail until such forfeiture is paid, but in no event to exceed 30 days. In determining whether an individual has the ability to pay a forfeiture, all items of income and all assets may be considered regardless of whether or not such income or assets are subject to garnishment, lien or attachment by creditors. C. As a substitute for or as an addition to forfeiture actions under Subsection A or corrective action under § 163-16C, the Village Attorney is authorized to seek enforcement of any part of this chapter by court action seeking injunctive relief. It shall not be necessary for the Village Attorney to take corrective action or prosecute for forfeiture before resorting to injunctive relief. § 163-18. Technical Standards and Specifications. The design of all best management practices designed to meet the requirements of this chapter shall comply with the following technical standards: A. Natural Resources Conservation Service’s “Wisconsin Field Office Technical Guide, Chapter 4” or its successor. B. Applicable construction or erosion control standards established by the Wisconsin Department of Natural Resources or State of Wisconsin. C. Any other technical methodology established by Dane County. § 163-19. Interpretation. The interpretation and application of this chapter shall be interpreted and liberally construed in the favor of the Village, and nothing in this chapter will be construed as a limitation or repeal of any power granted by Wisconsin law. § 163-20. Severability. If any portion of this chapter is ruled unenforceable or invalid by a court, the remainder of this chapter shall not be rendered invalid, ineffective, or unenforceable. Village of Cottage Grove, WI Downloaded from https://ecode360.com/CO1851 on 2026-08-21 Chapter 163 EROSION, SEDIMENT AND WATER RUNOFF CONTROL § 163-1. General provisions. § 163-2. Definitions. § 163-3. Scope of geographic coverage; exclusions. § 163-4. Technical standards and specifications. § 163-5. Applicability of requirement for erosion control permits. § 163-6. Applicability of requirement for stormwater control permits. § 163-7. Exemptions and clarifications. § 163-8. Preliminary review letter. § 163-9. Erosion control and stormwater control permits and administration. § 163-10. Erosion control plan requirements. § 163-11. Stormwater management plan requirements. § 163-12. Regulations for lands or activities not otherwise subject to this chapter. § 163-13. Off-site stormwater management. § 163-14. Appeals; variances. § 163-15. Permit fees. § 163-16. Enforcement. § 163-17. Violations and penalties. [HISTORY: Adopted by the Village Board of the Village of Cottage Grove 2-21-2011 by Ord. No. 02-2011; 1 amended in its entirety 5-16-2016 by Ord. No. 02-2016. Subsequent amendments noted where applicable.] GENERAL REFERENCES Comprehensive Master Plan — See Ch. 23. Building construction and fire prevention — See Ch. 130. Illicit discharge detection and elimination — See Ch. 164. Floodplain zoning — See Ch. 183. Subdivision of land — See Ch. 274. Water and sewers — See Ch. 312. Wellhead protection — See Ch. 317. Zoning — See Ch. 325. § 163-1. General provisions. A. Authority. This chapter is adopted under the author ity granted by ss. 61.34(1) , 61.35, 61.354, 62.23 and 236.45, Wisconsin Statutes. B. Legislative findings. (1) The Village Board of the Village of Cottage Gr ove finds that construction site erosion and uncontrolled stormwater runoff from land-dis turbing and land development activities have significant adverse impacts upon regional water re sources and the health, safety, property and general welfare of the community, and dimini sh the public enjoyment and use of natural 1. Editor’s Note: This ordinance also repealed former Ch. 163, Erosion, Sediment and Water Runoff Control, adopted 8-19-2002 by Village of Cottage Grove, WI Downloaded from https://ecode360.com/CO1851 on 2026-08-21 Ord. No. 15-2002, as amended in its entirety 7-17-2006 by Ord. No. 06-2006. Village of Cottage Grove, WI Downloaded from https://ecode360.com/CO1851 on 2026-08-21 § 163-1 COTTAGE GROVE CODE § 163-1 resources. Specifically, soil erosion and stormwater runoff can: (a) Carry sediment, nutrients, pa thogens, organic matter, heavy metals, toxins and other pollutants to regional lakes, streams and wetlands; (b) Diminish the capacity of water resources to support recreational and water supply uses and a natural diversity of plant and animal life; (c) Clog existing drainage systems, increasing maintenance problems and costs; (d) Cause bank and channel erosion; (e) Increase downstream flooding; (f) Reduce groundwater rech arge, which may diminish stream base flows and lower water levels in regional lakes, ponds and wetlands; (g) Contaminate drinking water supplies; (h) Increase risk of property damage and personal injury; and (i) Cause damage to agricultural fields and crops. (2) The Village Board of the Village of Cottage Grove also finds that effective sediment and stormwater management depends on proper pl anning, design, and timely installation of conservation and management practices and their continuing maintenance. C. Purpose and intent. (1) The purpose of this chapter is to set forth the minimum requirements for construction site erosion control and stormwater management that will dimi nish threats to public health, safety, public and private property and natural resources of Village of Cottage Grove. (2) This chapter is intended to regulate constr uction site erosion and stormwater runoff, to accomplish the following objectives: (a) Promote regional stormwater management by watershed; (b) Minimize flooding, sedimentation, water pollution from nutrients, heavy metals, chemical and petroleum products and other contaminants, flooding, and thermal impacts to the water resources of Cottage Grove; (c) Promote infiltration and groundwater recharge; (d) Protect functional values of natural watercourses and wetlands; (e) Provide a set of performance standards that are consistent with the standards set forth by Dane County and the Wisconsin Department of Natural Resources' runoff management standards contained in NR 151; (f) Achieve reductions in sediment and phosphorus load development in approved TMDL studies, and achieve a twenty-percent reduction in sediment load rates compared to no controls for existing developments; (g) Ensure no increase in the flow rate of surface water drainage from sites during or after construction; and Village of Cottage Grove, WI Downloaded from https://ecode360.com/CO1851 on 2026-08-21 § 163-1 EROSION, SEDIMENT AND WATER RUNOFF § 163-2 (h) Protect public and private property from damage resulting from runoff or erosion. (h)(i) Ensure no increase in temperature of stormw ater post-development to protect cold water communities. D. Abrogation and greater restrictions. It is not intended by this chapter to repeal, abrogate, annul, impair or interfere with any existing easements, covenants, deed restrictions, agreements, rules, regulations, ordinances or permits previously a dopted or issued pursuant to law. However, wherever this chapter imposes greater restrictions, the provisions of this chapter shall govern. E. Interpretation. In their interpretation and application, the provisions of this chapter shall be held to be the minimum requirements and shall not be deemed a limitation or repeal of any other power granted by the Wisconsin Statutes. Where any terms or requirements of this chapter may be inconsistent or conflicting, the more restrictive requirement or interpretation shall control. F. Effective date. This chapter shall become effect ive immediately upon publication and posting. After that date, all land-disturbing activities shall be in compliance with all provisions of this chapter. § 163-2. Definitions. The following terms, wherever they appear in this chapter, are defined as follows: AFFECTED — That a regulated activity has significantly: A. Caused negative impacts on water quality or the use or maintenance of one's property or business; or B. Endangered one's health, safety, or general welfare. AGRICULTURAL — Related to or used for the production of food and fiber, including, but not limited to, general farming, livestock and poul try enterprises, grazing, nurseries , horticulture, viticulture, truck farming, forestry, sod production, cranberry producti ons and wild crop harvesting. Clearing and grubbing of an area or structural development are not agricultural activity. AVERAGE ANNUAL RAINFALL — Measured precipitation in Madison, Wisconsin, between March 12 and December 2, 1981. BANK EROSION — The removal of soil or rock fragm ents along the banks or bed of a stream channel resulting from high flow after rain events. BASIN — The total area drained by a waterway as desi gnated by the Village Engineer or the total area drained by any of the waterway's tributaries, exclusive of any other drainage area. BMP or BEST MANAGEMENT PRACTICE — A practice, technique, or measure that is an effective, practical means of preventing or reducing soil erosion or water pollution, or both, from runoff both during and after land development activities. These can include structural, vegetative or operational practices. CLOSED WATERSHED — An area that does not have a su rface outlet, with water only able to leave through evaporaton, infiltration, or mechanical means. Examples of a closed watershed include, but are not limited to: A. Internally drained watersheds that are at least 20,000 square feet in area and at least 1 foot in depth from invert to lowest surface outlet. B. Watersheds with no surface outlet discharges from a 2-year, 24 hour design storm. C. Areas that have historically not drained through surface outlets, as determined by the Village. COMMERCIAL — For the retail or whol esale sale of goods or services. CONNECTED IMPERVIOUSNESS — An impervious surface that is directly connected to a separate storm sewer or water of the state via an impervious flow path. CONSTRUCTION SITE EROSION CONTROL — Preventing or reducing soil erosion and sedimentation Formatted: Not Expanded by / Condensed by Formatted: Numbered + Level: 1 + Numbering Style: A, B, C, … + Start at: 1 + Alignment: Left + Aligned at: 0.5" + Indent at: 0.75" Village of Cottage Grove, WI Downloaded from https://ecode360.com/CO1851 on 2026-08-21 from land-disturbing activity. CONTROL PLAN — An erosion control plan required by § 163-5 or a stormwater management plan required by § 163-6. DESIGN STORM — A hypothetical rainstorm that occurs with a specified recurrence interval in the Village. For example, a 10-year, 24 hour design storm defines a rainstorm that occurs over 24 hours, with a recurrence interval of 10 years. The amounts associated with these storms are further defined as follows: A. 1-year 24-hour design storm is 2.49 inches over 24 hours using MSE4 NRCS rainfall distribution. B. 2 year, 24-hour design storm is 2.84 inches over 24 hours using MSE4 NRCS rainfall distribution. C. 10-year, 24-hour design storm is 4.09 inches over 24 hours using MSE4 NRCS rainfall distribution. D. 100-year, 24-hour design storm is 6.66 inches over 24 hours using the MSE4 NRCS rainfall distribution. E. 200-year, 24-hour design storm is 7.53 inches over 24 hours using the MSE4 NRCS rainfall distribution. F. 500-year, 24-hour design storm is 8.94 inches over 24 hours using the MSE4 NRCS rainfall distribution. DEVELOPMENT — Any of the following activities: A. Construction of a new building or other structure; B. Expansion or alteration of an existing structure that results in an increase in the ground surface dimensions of the building or structure; C. Land disturbing activity; or D. Creation of expansion of impervious surfaces. DIRECT CONDUITS TO GROUNDWATER — Wells, sinkholes, swallets, fractured bedrock at the surface, mine shafts, none-metallic mines, tile inlets discharging to groundwater, quarries, or depressional groundwater recharge areas over shallow fractured bedrock. DIRECTOR — The Director of Public Works or designee. EASEMENT — An interest in land owned by another th at creates a non-possessory right to enter and use the property of another for specific purposes. EASEMENT HOLDER —The holder or beneficiary of an easement that authorizes the activity on the land for the permit sought under this chapter. EFFECTIVE INFILTRATION AREA — The area of the infiltration system that is used to infiltrate runoff and does not include the area used for site access, berms or pretreatment. EROSION (SOIL EROSION) — The detachment and moveme nt of soil or rock fragments by water, wind, Formatted: Numbered + Level: 1 + Numbering Style: A, B, C, … + Start at: 1 + Alignment: Left + Aligned at: 0.25" + Indent at: 0.5" Formatted: Left, Right: 0", Space Before: 5.9 pt Village of Cottage Grove, WI § 163-2 COTTAGE GROVE CODE § 163-2 Downloaded from https://ecode360.com/CO1851 on 2026-08-21 ice or gravity. EXCAVATION — Any act by which organic matter, earth, sand, gravel, rock or any other similar material is cut into, dug, quarried, uncovered, removed, disp laced, relocated or bulldozed and shall include the resulting conditions. EXISTING DEVELOPMENT — Buildings and other stru ctures and impervious area existing prior to August 22, 2001. FILL — Any act by which earth, sand, gravel, rock or any other material is deposited, placed, replaced, pushed, dumped, pulled, transported, or moved to a new location and shall include the resulting conditions. GREEN INFRASTRUCTURE — Practices that use plant or soil systems, permeable pavement or other permeable surfaces or substrates, stormwater harvest a nd reuse, or landscaping to store, infiltrate, or evaportanspirate stormwater and reduce flows to sewer systems or to surface waters. Green infrastructure includes, but is not limited to, the following practices: rainwater harvesting/reuse, rain gardens, bioretention systems, infiltration basins, planters that are conne cted to roof drainage, ve getated swales, permeable pavement, green roofs, and rain barrels. GRADING — Altering the elevation of the land surface by stripping, excavating, filling, stockpiling of soil materials or any combination thereof and shall include the land from which the material was taken or upon which it was placed. GULLY EROSION — A severe loss of soil caused by or resulting in concentrated flow of sufficient velocity to create a defined flow channel. HEAVILY DISTURBED SITE — A site where an area of land is subjected to significant compaction due to the removal of vegetative cover or earthmoving activities, including filling. HYDROLOGIC SOIL GROUP (HSG) — Has the meaning used in the runoff calculation methodology promulgated by the United States Natural Resources Conservation Service Engineering Field Manual for Conservation Practices. IMPERVIOUS SURFACE — Any land cover that preven ts rain or melting snow from soaking into the ground, such as roofs (including overhangs), road s, sidewalks, patios, driveways and parking lots. For purposes of this chapter, all road, driveway or parking surfaces, including gravel surfaces, shall be considered impervious, unless specifically designed to encourage infiltration and approved by the local approval authority. INFILTRATION — A. Refers to any precipitation that does not leave the site as surface runoff. Also known as “stay on.” B. The process by which rainfall or runoff seeps into the soil. INFILTRATION SYSTEM — A device or practice such as a basin, trench, rain garden or swale designed specifically to encourage infiltration, but does not include natural infiltration in pervious surfaces such as lawns, redirecting of rooftop downspouts onto lawns or minimal infiltration from practices such as swales or road side channels designed for conveyance and pollutant removal only. KARST FEATURE — An area or surficial geologic feature subject to bedrock dissolution so that it is likely to provide a conduit to groundwater, and may include caves, enlarged fractures, mine features, exposed bedrock surfaces, sinkholes, springs, seeps or swallets. LAND-DISTURBING ACTIVITIES — Any la nd alterations or disturbances that may result in soil erosion, sedimentation, or change in runoff, including bu t not limited to removal of ground cover, grading, excavating, and filling of land. LANDOWNER — Any person holding title to or having an ownership interest in land. LIGHTLY DISTURBED SITE — A site where an area of land is subjected to minor compaction due to the Village of Cottage Grove, WI § 163-2 COTTAGE GROVE CODE § 163-2 Downloaded from https://ecode360.com/CO1851 on 2026-08-21 limited removal of vegetative cover or earthmoving activities. LOCAL LAND DIVISION ORDINANCE — Any county, city, Village or town ordinance adopted under Chapter 236, Wis. Stats., to regulate the division of land. Village of Cottage Grove, WI Downloaded from https://ecode360.com/CO1851 on 2026-08-21 § 163-2 EROSION, SEDIMENT AND WATER RUNOFF § 163-2 MAJOR LAND-DISTURBING ACTIVITIES — Those activities where: A. The land disturbance exceeds 20,000 square feet in area; or B. The slope of the land exceeds 6%; or C. The Village Engineer determines that special circumstances due to topography, proximity to watercourses or relation to sensitive environmental areas make the disturbance a major one. MAXIMUM EXTENT PRACTICABLE (MEP) — A level of implementing best management practices in order to achieve a performance standard specified in this chapter which takes into account the best available technology, cost effectiveness and other competing is sues such as human safety and welfare, endangered and threatened resources, historic properties and geographic features. MEP allows flexibility in the way to meet performance standards and may vary based on the performance standard and site conditions. MINOR LAND-DISTURBING ACTIVITIES — Those activities where: A. The land disturbance does not exceed 20,000 square feet in area; and B. The slope of the land does not exceed 6% throughout the site. NEW DEVELOPMENT — Any of the following activities: A. Structural development, including construction of a new building or other structures; B. Expansion or alteration of an existing structure that results in an increase in the surface dimensions of the building or structure; C. Land-disturbing activities; or D. Creation or expansion of impervious surface.Development that results in the cumulative increase of 20,000 square feet of impervious surface to a site since August 21, 2001. New development can also include redevelopment. NONEROSIVE VELOCITY — A rate of flow of stormwat er runoff, usually measured in feet per second, that does not erode soils. Nonerosi ve velocities vary for individual sites, taking into account topography, soil type, and runoff rates. PEAK FLOW — The maximum rate of flow of water at a given point in a channel, watercourse, or conduit resulting from the predetermined storm or flood. PERSON — Any individual, corporation, partnership, joint venture, agency, unincorporated association, municipal corporation, county, or state agency w ithin Wisconsin, the federal government, or any combination thereof. PERVIOUS SURFACE — Any land cover that permits rain or melting snow to soak into the ground. PERMITTEE — A landowner, easement holder, or deve loper who has applied fo r a permit under this Chapter and is responsible for the requirements of the permit. POST-DEVELOPMENT — Refers to the extent and distri bution of land cover types anticipated to occur under conditions of full development of the submitted plan. This term is used to match pre- and post- development stormwater peak flows as required by the chapter. PREDEVELOPMENT — Refers to the extent and dist ribution of land cover types present before the initiation of the proposed of land development activity, assuming that all land uses prior to land-disturbing activity are in "good" condition as described in th e Natural Resources Conser vation Service Technical Release 55, "Urban Hydrology for Small Watersheds" (c ommonly known as TR-55). This term is used to match pre- and post-development stormwater peak flows as required by the chapter. In a situation where the cumulative impervious surface created after August 21, 2001, exceeds the twenty-thousand-square-foot threshold, the predevelopment conditions shall be those prior to the proposed land disturbance. Formatted: Body Text, Indent: Left: 0.25", Space Before: 6.35 pt, No bullets or numbering, Tab stops: Not at 0.58" Village of Cottage Grove, WI Downloaded from https://ecode360.com/CO1851 on 2026-08-21 PROTECTIVE AREA — An area of land that commences at the top of the channel of lakes, streams Village of Cottage Grove, WI § 163-2 COTTAGE GROVE CODE § 163-2 Downloaded from https://ecode360.com/CO1851 on 2026-08-21 and rivers, or at the delineated boundary of wetlands , and extends horizontally for the width specified in § 163-11B(7)(a) from the top of the channel or de lineated wetland boundary to the closest impervious surface. In this chapter, "protective area" does not include any area of land adjacent to any stream enclosed within a pipe or culvert, such that runoff cannot enter the enclosure at this location. RECHARGE — The portion of the average annual rainfall that infiltrates the soil and becomes groundwater. Recharge does not include evaporation, transpiration, or runoff from the site. REDEVELOPMENT — Any construction, alteration or improvement exceeding 4,000 square feet of land disturbance performed on sites wh ere the existing site is predominantly developed as commercial, industrial, institutional or multifamily residential us es. Projects may include a mix of redevelopment and new impervious surfaces. New impervious surfaces added as a result of redevelopment are subject to § 163-6A. RUNOFF CURVE NUMBER (RCN) — Has the meaning used in the runoff calculation methodology promulgated by the United States Natural Resources Conservation Service Engineering Field Manual for Conservation Practices. SEDIMENT — Solid earth material, both mineral and organic, that is in suspension, is being transported, or has been moved from its site of origin by air, wate r, gravity or ice, and has come to rest on the earth's surface at a different site. SEDIMENTATION — The deposition of eroded soils at a site different from th e one where the erosion occurred. SHEET AND RILL EROSION — A loss of soil caused by sheet flow or shallow concentrated flow, and characterized by an absence of channeling or a relatively uniform loss across the exposed upper layer of the soil or shallow irregular scouring of the soil surface. SITE — The bounded area described in an erosion control plan or stormwater management plan. SLOPE — The net vertical rise over horizontal run, expressed as a percentage, which represents a relatively homogeneous surface incline or decline over the area disturbed. SOIL LOSS RATE — The rate, usually measured in tons per acre per year, at wh ich soil is transported beyond the perimeter of a given control site and which occurs as a result of sheet and rill erosion. This term does not apply to soil movement resulting from concentrated flow such as gully or bank erosion. STORM EVENTS — The precipitation amounts that oc cur over a twenty-four-hour period that have a specified recurrence interval for Dane County, Wisconsin. For example, one-, two-, ten-, and one-hundred- year storm events mean the precipitation amounts that occur over a twenty-four-hour period that have a recurrence interval of one, two, 10, and 100 years, respectively. STORMWATER — The flow of water which results from, and which occurs during and immediately following, a rainfall, snow- or ice-melt event. STORMWATER MANAGEMENT — Any measures taken to permanently reduce, or minimize the negative impacts of stormwater runoff quantity and quality after land development activities. STORMWATER RUNOFF — The waters derived from ra ins falling or snowmelt or ice melt occurring within a drainage area, flowing over the surface of the ground and/or collected in channels, watercourses or conduits. STREET RECONSTRUCTION — Removal and replacem ent of the road subgrade, where existing stormwater conveyance systems are modified. STRUCTURE — Any human-made object with form, shape and utility, either permanently or temporarily attached to, placed upon, or set into the ground, stream bed or lake bed. SUB-BASIN — A subdivision of a basin all of which drains to a single identifiable location. Village of Cottage Grove, WI § 163-2 EROSION, SEDIMENT AND WATER RUNOFF § 163-5 Downloaded from https://ecode360.com/CO1851 on 2026-08-21 TMDL or TOTAL MAXIMUM DAILY LOAD — The amount of pollutants specified as a function of one or more water quality parameters that can be discharged per day into a water quality limited segment and still ensure attainment of the applicable water quality standard. The USEPA and WDNR approved report "Total Maximum Daily Loads for Total Phosphorus and Total Suspended Solids in the Rock River Basin" dated July 2011 specifies an annual percent reductio n for pollutants necessary to meet the wasteload allocations assigned to the Village of Cottage Grove. UNNECESSARY HARDSHIP — That circumstance where special conditions, which were not self- created, affect a particular property and make strict conformity with regulations unnecessarily burdensome or unreasonable in light of the purposes of this chapter. VILLAGE — The Village of Cottage Grove. VILLAGE AGENT — The Erosion Control Officer, th e Village Engineer, the Building Inspector or any other Village employee or official assigned or charged with the responsibility of administering and enforcing the requirements of this chapter or any inde pendent contractor retained by the Village for such purpose. VILLAGE ENGINEER — The individual, or the individu al's designee, or the firm, or a representative of the firm, appointed or retained by the Village Bo ard to routinely provide en gineering services for the Village. § 163-3. Scope of geographi c coverage; exclusions. A. Within the Village. Unless specifically excluded herein, this chapter applies to all land-disturbing and land developing activities occurring within the corporate limits of the Village. B. Within the extraterritorial area. This chapter shall apply outside the Village limits within the extraterritorial plat review area provided by Chapter 236, Wis. Stats., but only to those land-disturbing activities relating to, arising from, or connected wi th a subdivision as defined in s. 236.02, Wis. Stats.(12) § 163-4. Technical standa rds and specifications. The design of all best management practices designed to meet the requirements of this chapter shall comply with the following technical standards: A. Natural Resources Conservation Service's "Wisconsin's Field Office Technical Guide, Chapter 4;" or its successor; B. Applicable construction erosion control standa rds by the Wisconsin Department of Natural Resources; C. Any other technical methodology approved by the Dane County Conservationist. § 163-5. Applicability of requirem ent for erosion control permits. Unless expressly exempted by § 163-7, an erosion cont rol permit under § 163-9 shall be required and all construction site erosion control provisions of this chapter shall apply, to any of the following activities in Village of Cottage Grove; A. Land-disturbing activity in excess of 4,000 square feet; B. Land-disturbing activity on a slope of greater than 12%; Village of Cottage Grove, WI § 163-5 COTTAGE GROVE CODE § 163-7 Downloaded from https://ecode360.com/CO1851 on 2026-08-21 C. Land-disturbing activity that involves the excavatio n or filling, or a combination of excavation and filling, in excess of 400 cubic yards of material; D. Land-disturbing activity that disturbs more than 100 lineal feet of road ditch, grass waterway or other land area where surface drainage flows in a defined open channel; including the placement, repair or removal of any underground pipe, utility or other facility within the cross-section of the channel; E. Any new public or private roads or access drives longer than 125 feet; F. Development that requires a subdivision plat, as defined in the applicable local land division ordinance(s); G. Land-disturbing activity that disturbs less than 4,000 square feet of land, including the installation of access drives, that the local approval authority determines to have a high risk of soil erosion or water pollution, or that may significantly impact a lake, stream, or wetland area. Examples of activities with a high risk of soil erosion or water pollution may include, but are not limited to, land disturbance on erodible soil or disturbance adjacent to lakes, rivers, streams or wetlands. All such determinations made by the local approval authority shall be in writing, unless waived by applicant. § 163-6. Applicability of requirement for stormwater control permits. Unless otherwise exempted by § 163-7, a stormwater control permit under § 163-9 shall be required and all stormwater management provisions of this chapter shall apply to any of the following activities within the Village of Cottage Grove: A. Any development(s) after August 22, 2001, that result(s) in the cumulative addition of 20,000 square feet of impervious surface to the site; B. Agricultural development that creates new imperv ious surface area exceeding 20,000 square feet on the site; C. Any development that requires a subdivision plat, as defined in applicable local land division ordinance(s); D. Any development that requires a certified survey map, as defined in the applicable local land division ordinance(s); for property intended for commercial or industrial use; E. Redevelopment, as defined in § 163-2. F. Other land development activities, including but not limited to redevelopment or alteration of existing buildings and other structures, that the local approval authority determines may significantly increase downstream runoff volumes, flooding, soil eros ion, water pollution or property damage, or significantly impact a lake, stream, or wetland area. All such determinations shall be made in writing unless waived by the applicant. § 163-7. Exemptions and clarifications. A. Any activity directly related to the planting, growi ng and harvesting of agricultural crops is exempt from all requirements of this chapter; B. The following activities are exempt from the construction site erosion control provisions of § 163-5: (1) One- and two-family dwelling units regulated under the Wisconsin Uniform Dwelling Code. Land-disturbing activities in excess of one acre, or not associated with the construction of a Village of Cottage Grove, WI § 163-7 EROSION, SEDIMENT AND WATER RUNOFF § 163-8 Downloaded from https://ecode360.com/CO1851 on 2026-08-21 dwelling, are not exempt from this chapter. (2) Projects specifically exempted from local eros ion control ordinances under state or federal statute. It is the responsibility of the landowner to demonstrate such exemption with documentation acceptable to the local approval authority. (3) Municipal road or county highway project not exempted under § 163-7B(2) are exempt from § 163-11B(3) and (4) where all of the following conditions are met: (a) The purpose of the project is only to meet current state or federal design or safety guidelines; (b) All activity takes place within existing public right-of-way; (c) All other requirements of § 163-11 are met; and (d) The project does not include the addition of new driving lanes. C. The following activities are exempt from the infiltration standards described in § 163-11B(6): (1) Redevelopment sites. (2) New development sites with less than ten-percent-connected imperviousness based on complete development of the post-construction site, provided the cumulative area of all impervious surface is less than one acre. (3) Agricultural facilities and practices. (4) Areas where the infiltration rate of the soil is less than 0.6 inch/hour measured at the bottom of the proposed infiltration system where the soil layer is not easily removed or manipulated. (5) Expansion of Parking areas and access roads le ss than 5,000 square feet for commercial and industrial development. (6)(5) Rrooads in commercial, industrial and institutional land uses, and arterial roads. D. The following activities are exempt from the protective area requirements described in § 163-11B(7): (1) Redevelopment sites; (2) In-fill development areas of less than five acres; (3) Structures that cross or access surface waters, such as boat landings, bridges and culverts; (4) Structures constructed in accordance with s. 59.692(1v), Wis. Stats.; and (5) Post-construction sites from which runoff does no t enter the surface water, except to the extent that vegetative ground cover is necessary to maintain bank stability. § 163-8. Preliminary review letter. A. A preliminary review letter provides a potential perm it applicant with an initial simple evaluation of whether erosion and stormwater control standards can be met for a proposed site, lot layout, and/or construction design. This review is intended to assi st applicants in preparing general site plans and other submittals necessary to obtain an erosion control and stormwater permit. A preliminary review Village of Cottage Grove, WI § 163-8 COTTAGE GROVE CODE § 163-9 Downloaded from https://ecode360.com/CO1851 on 2026-08-21 letter does not guarantee that an erosion or stormwater control plan will be approved or that a permit will be issued. Erosion and stormwater control plans and permit applications must meet all applicable standards and criteria for approval. B. A preliminary review letter shall be required fo r all activities requiring an erosion control or stormwater management permit under §§ 163-5 and 163-6. C. Application requirements. (1) A preliminary review letter must be submitted to and approved by the Village Engineer before an erosion control or stormwater management permit application may be submitted. (2) The following materials must be included in the preliminary review letter: (a) A narrative describing the proposed project. (b) A map showing the following information: [1] Location of the proposed project; [2] Limits of disturbed area; [3] Limits of impervious area; [4] Drainage area for each watershed area; and [5] Location and description of proposed stormwater facilities. (c) Preliminary runoff calculations which clearly demonstrate the adequacy of the proposed facilities and land that will be dedicated to stormwater management for meeting the standards of this chapter. D. Approval process. (1) The Village Engineer shall review the letter and determine whether erosion and stormwater control standards can be met for a proposed site, lot layout, and/or construction design. (2) Within 15 days of receiving the preliminary review letter, the Village Engineer shall either approve the preliminary plan or notify the applicant of any deficiencies. (3) The Village Engineer shall notify the applicant in writing of any deficiency in the preliminary plan and the applicant shall be given an opportunity to correct any deficiency. (4) Approval of a preliminary review letter does not guarantee that an erosion or stormwater control plan will be approved or that a permit will be issued. Erosion and stormwater control plans and permit applications must meet all applicable standards and criteria for approval. § 163-9. Erosion control and stormwater control permits and administration. A. No activity meeting the criteria described in §§ 163-5 and 163-6 shall occur and no zoning permit may be issued until an erosion control and stormwater control permit is issued by the Village. B. The applicant must provide the following when requesting a permit: (1) Completed application form: Village of Cottage Grove, WI § 163-9 EROSION, SEDIMENT AND WATER RUNOFF § 163-9 Downloaded from https://ecode360.com/CO1851 on 2026-08-21 (a) The application must be signed by the landowner, easement holder, or include a notarized statement signed by the landowner or easement holder authorizing the applicant to act as the landowner's or easement holder’s agent and bind the landowner to the terms of this chapter. (b) If a landowner or easement holder appoints an agent to submit an application pursuant to Subsection B(1) (a), the landowner or easement holder shall be bound by all of the requirements of this chapter and the terms of any permit issued to the agent. If the applicant is an easement holder or an agent of an ea sement holder, the applicant must provide the landowner notice and a copy of the permit application and all supporting documentation. The Village will provide the landowner with copies of all permits and notifications issued regarding permit applications. (2) Fees as required by § 163-15. (3) Copy of preliminary review letter, as described in § 163-8. (4) If required by § 163-5, an erosion control plan meeting all the standards of § 163-10A and C, or a simplified checklist as described in § 163-10B. (5) If required by § 163-6, a stormwater management plan meeting all of the standards of § 163-11 and a draft maintenance agreement as described in § 163-11A(8). (6) Copies of permits or permit applications or approvals required by any other governmental entity. (7) A proposed timetable and schedule for completion and installation of all elements of approved erosion control and stormwater management plan s and a detailed schedule for completion of construction. (8) An estimate of the cost of completion and installation of all elements of the approved erosion control and stormwater management plans. (9) Evidence of financial responsibility to complete the work proposed in the plan. For major land- disturbing activities, the applicant shall provide, prior to issuance of the permit, an irrevocable letter of credit, certificate of deposit or certified check to the Village in an amount equal to 125% of the estimated cost of all required control measures as determined by the Village Engineer. The security deposited shall guarantee that all required control measures will be taken or installed according to the approved plan. The security shall remain in full force until released by the Village Board, and only after an inspection by the Village Engineer assures that all required control measures have been fully and satisfactorily completed. The Village shall have the right to draw upon the security for purposes of obtaining compliance with the approved control plan as it deems necessary. If the erosion and runoff control requirements of this chapter are included as part of plat or certified survey map condition s of approval, then, security for performance of the control requirements may be included as part of the overall security required for installation of improvements under Chapters 23, 274 and 325 of the Village Ordinances. C. Approval process. (1) Major land-disturbing activities. (a) The Village Engineer shall verify that the permit application is complete under § 163-9B and review the plan(s) for compliance with the standards identified in §§ 163-10 and 163- 11. The Village may request additional informa tion at any time to determine ordinance compliance. (b) The Village Engineer shall eith er approve the submitted plan or notify the applicant in Village of Cottage Grove, WI § 163-9 EROSION, SEDIMENT AND WATER RUNOFF § 163-9 Downloaded from https://ecode360.com/CO1851 on 2026-08-21 writing of any deficiencies, within 30 days of receipt of the control plan. Staff engaged in this review and approval process shall be ce rtified where appropriate by the Wisconsin Department of Safety and Professional Services for this purpose. Village of Cottage Grove, WI § 163-9 COTTAGE GROVE CODE § 163-9 Downloaded from https://ecode360.com/CO1851 on 2026-08-21 (2) Minor land-disturbing activities. (a) The Village Agent shall verify the permit application is complete under § 163-9B and review the plan for compliance with this chapter in accordance with the Erosion Control Checklist attached hereto and incorporated herein as Exhibit A 2 established by the Village Engineer and approved by the Village Board. The Village may request additional information at any time to determine ordinance compliance. (b) The Village Agent shall approve, reject or conditionally approve the plan within the same number of working days as required for issuance of a building permit, but in no event more than three working days after receipt of the completed control plan statement. If the control plan statement is rejected or conditionally approved, the applicant shall be informed, in writing, of the reasons for rejection or conditions of approval. Staff engaged in this review and approval process shall be certified where appropriate by the Wisconsin Department of Safety and Professional Services for this purpose. (3) Where installed stormwater practices will be pr ivately owned, an affidavit which describes the property by legal description, notifying future prospective purchasers of the existence of a stormwater permit (which is on file at Village Hall) issued under this chapter and applicable plan, timetables and potential liability imposed by § 163-16C for failure to bring the property into compliance with this chapter after notificat ion, shall be recorded with the Dane County Register of Deeds prior to issuance of an erosion and stormwater control permit. The foregoing information shall also be noted on every plat and certified survey map. (4) Upon approval of the Village Engineer, the erosion control or stormwater management permit shall be issued by the Village after the applicant has met all other requirements of this chapter. D. Permit conditions. (1) The plan shall be implemented prior to the start of any land-disturbing activity and shall be maintained over the duration of the project. Stormwater components of the plan shall be maintained in perpetuity. (2) The permittee is responsible for successful completion of the erosion control plan and the stormwater management plan. The permittee shall be liable for all costs incurred, including environmental restoration costs, resulting from noncompliance with an approved plan. (3) Application for a permit shall constitute express permission by the permittee and landowner for the Village Agent to enter the property for purposes of inspection under Subsection E or curative action under § 163-16C. The application form contains a prominent provision advising the applicant and landowner of this requirement. (4) All incidental mud-tracking off site onto adjace nt public thoroughfares shall be cleaned up and removed by the end of each working day using proper disposal methods. (5) A copy of the approved permit and erosion control plan shall be kept on the project site, in a place readily accessible to contractors, engineers, local approval authority inspection staff and other authorized personnel. E. Inspections. (1) Application for a permit under this chapter shall constitute permission by the applicant and 2. Editor's Note: Said exhibit is on file in the Village offices. Village of Cottage Grove, WI § 163-9 EROSION, SEDIMENT AND WATER RUNOFF § 163- Downloaded from https://ecode360.com/CO1851 on 2026-08-21 landowner for the Village Agent to enter upon the property and inspect during the construction phase prior to the inspections pursuant to Subs ection E(4) and (6), as necessary to confirm compliance with the requirements of this chapter. (2) As part of the plan approval process, the Village Agent shall determine the minimum number of inspections required to assure compliance. The site of any regulated land-disturbing activity shall be inspected once every 30 days, or more frequently as determined by the Village Engineer during the construction phase with assistance from th e Erosion Control Officer and/or Building Inspector. The Village Agent's compliance inspections do not relieve the permittee from performing and documenting their own inspections required by ch. NR 151, Wis. Adm. Code. (3) Within 10 days after installation of all practic es in an approved erosion control plan and achievement of soil stabilization, the permittee shall notify the Village Clerk and Erosion Control Officer. The permittee shall inspect the site weekly and prior to every forecasted rain fall of ½ inch or greater. (4) The Village Agent shall inspect the property to verify compliance with the erosion control plan within 10 days of notification of soil stabilization. (5) Within 10 days after installation of all practices in an approved stormwater management plan, the permittee shall notify the Village Clerk and submit drawings documenting construction. The person who designed the stormwater management plan for the permittee shall submit as-built certification to ensure that constructed st ormwater management practices and conveyance systems comply with the specifications included in the approved plans. At minimum, as-built certification shall include a set of drawings comparing the approved stormwater management plan with what was constructed. Other information shall be submitted as required by the Village Engineer, Building Inspector, or Erosion Control Officer. (6) The Village Agent shall inspect the property to verify compliance within 10 days of notification. (7) Maintenance is the responsibility of the owner, and facilities are subject to inspection and orders for repairs. F. Permit transfers. (1) The affidavit [required in § 163-9C(3)] describing the property by legal description and notifying future prospective purchasers of the existence and responsibilities associated with the stormwater permit on file at Village Hall runs with the property. (2) The permittee may not transfer interest in property subject to an approved plan prior to completion of the proposed steps to attain soil stabilization without Village approval. (2)(3) When a permittee and landowner transfers owners hip, possession or control of real estate subject to either or both an uncompleted erosion control or stormwater management plan, the successor in interest to any portion of the real es tate shall be responsible to control soil erosion and runoff and shall comply with the minimum standards provided in this chapter. (3)(4) When ownership, possession or control of proper ty subject to an uncompleted erosion control or stormwater management plan, or both, is tran sferred, the former owner (seller) shall notify the new owner (buyer) as to the current status of compliance with notice to the authority, and provide a copy of the erosion control plan or stormwater management plan, or both. (4)(5) Transfers of interest in real estate subject to an approved, uncompleted plan may be conducted consistent with this chapter under any of the following arrangements: (a) The transferee shall file a new, approved erosion control or stormwater management plan, Village of Cottage Grove, WI § 163-9 EROSION, SEDIMENT AND WATER RUNOFF § 163- Downloaded from https://ecode360.com/CO1851 on 2026-08-21 or both, with the authority; Village of Cottage Grove, WI § 163-9 COTTAGE GROVE CODE § 163-11 Downloaded from https://ecode360.com/CO1851 on 2026-08-21 (b) The transferee shall obtain an approved assignment from the authority as sub-permittee to complete that portion of the approved plan regulating soil erosion and runoff on the transferee's property. (c) The permittee shall provide the authority with a duly completed and executed continuing surety bond or certified check in an amount sufficient to complete the work proposed in the approved plan; at the time of transfer, the permittee may seek to reduce the surety bond or certified check to the appropriate amount to complete remaining work. If the transferor enters into escrow agreements with transferees to complete an approved plan, these funds shall be available to the authority to attain plan compliance. When an approved erosion control plan and, if required, a stormwater management plan is or are not completed as proposed, the authority may use the surety bond to complete remaining work to achieve plan compliance. G. Plan or permit amendments. Any proposed modificati ons to approved plans, construction schedules or alterations to accepted sequencing of land-disturbing site activities shall be approved by the Village Engineer in consultation with the Erosion C ontrol Officer or Building Inspector prior to implementation of said changes. One permit revision is allowed at no charge. The second and subsequent revisions, to a maximum of five revisions, cost $50 each. H. Timeframe and Expiration. (1) Erosion control plan construction must begin wi thin one year from date of filing a complete application. (2) Except as otherwise specified, all permit applications will expire the sooner of: (a) One year after the applicant is notified of, but does not adequately address, a deficiency; or (b) Three years from date of filing a complete application. (3) Erosion control permits will expire the sooner of: (a) Upon the stabilization date in the approved plan; or G.(b) three years after permit issuance. § 163-10. Erosion control plan requirements. A. The erosion control plan shall meet the more stringent requirements between those identified in this chapter and those identified in the most current version of Dane County erosion control ordinance requirements. A.B. Plan materials. Erosion control plans required under § 163-5 may include consideration of adjoining landowners' cooperative efforts to control transport of sediment and, except as specifically exempted below, shall include at a minimum the following information: (1) Property lines, lot dimensions, and limits of disturbed area, including areas within five (5) feet of the property line; (2) Limits of impervious area, including buildings. Include all public and private roads, interior roads, driveways and parking lots, and indicate type of paving and surface material; (3) All natural and artificial water features includi ng, but not limited to, lakes, ponds, streams (including intermittent streams), and ditches; and areas of natural woodland or prairie. The plan must show ordinary high-water marks of all navigable waters, one-hundred-year flood elevation and delineated wetland boundaries. A certifi ed flood zone determination and/or wetland Formatted Village of Cottage Grove, WI § 163-9 COTTAGE GROVE CODE § 163-12 Downloaded from https://ecode360.com/CO1851 on 2026-08-21 delineation may be required at the applicant's expense; (4) Cross sections of and profiles of channels, swales and road ditches; (5) Culvert sizes; (6) Direction of flow of runoff; (7) Watershed size for each drainage area; (8) Design discharge for ditches and structural measures; (9) Runoff velocities; (10) Fertilizer and seeding rates and recommendations; (11) Time schedules for stabilization of ditches and slopes; (12) Description of methods by which sites are to be developed and a detailed land disturbance (12) Village of Cottage Grove, WI § 163-10 EROSION, SEDIMENT AND WATER RUNOFF § 163-10 Downloaded from https://ecode360.com/CO1851 on 2026-08-21 schedule including time schedules for stabilization of ditches and slopes; (13) Provision for sequential steps mitigating erosive effect of land-disturbing activities to be followed in appropriate order and in a manner consistent with accepted erosion control methodology suitable to proposed sites and amenable to prompt revegetation, including runoff calculations as appropriate; (14) Provisions to prevent mud-tracking off site on to public thoroughfares during the construction period; (15) Provisions to prevent the discharge of sediment from dewatering activities; (16) Provisions to disconnect impervious surfaces, where feasible; (17) Provisions to prevent sediment delivery to, and accumulation in, any proposed or existing stormwater conveyance systems (both on-site and off-site); (18) Copies of permits or permit applications required by any other unit of government or agency; (19) Existing and proposed elevations (referenced to the North American Vertical Datum of 1988) and existing and proposed contours in the area, where deemed necessary. (20) Any other information necessary to reasonably determine the location, nature and condition of any physical or environmental features of the site; (21) Provisions to prevent the transport by runoff of chemicals, cement and other building compounds and materials on the construction site during the construction period;. (21)(22) Areas of natural woodland or prairie. B.C. Simplified plan checklist. For minor land-disturbing activities, as defined in § 163-2, applicants may submit erosion control proposals using simplified checklists of standard erosion control practices, on a standard form established by the Village Engineer and approved by the Village Board and a simple map and site development schedule. Simplified plan checklists shall be reviewed by the Village Agent for completeness and accuracy. C.D. Erosion control performance standards. (1) Proposed design, suggested location and phased implementation of effective, practicable erosion control measures for plans shal l be designed, engineered and implemented to achieve the following results: (a) Prevent gully and bank erosion; (b) Limit total off-site permissible annual aggregate soil loss for exposed areas resulting from sheet and rill erosion to an annual, cumulative soil loss rate not to exceed five tons per acre annually; and (c) Discharges from new construction sites must have a stable outlet capable of carrying designed flow as required in § 163-11B(4), at a nonerosive velocity. Outlet design must consider flow capacity and flow duration. This requirement applies to both the site outlet and the ultimate outlet to stormwater conveyance or waterbody. (d) Prevent or reduce all of the following: 1. The depositing of soil from being tracked onto streets by vehicles. 2. The discharge of sediment from disturbed areas into on-site storm water inlets. Village of Cottage Grove, WI § 163-10 EROSION, SEDIMENT AND WATER RUNOFF § 163-11 Downloaded from https://ecode360.com/CO1851 on 2026-08-21 3. The discharge of sediment from disturbed ar eas into adjacent waters of the State of Wisconsin. 4. The discharge of sediment from drainage ways that flow off the site. 5. The discharge of sediment by dewatering activities. 6. The discharge of sediment eroding from soil stockpiles existing for more than 7 days. (c)7. The transport by runoff chemicals, cement, and other building compounds and materials on a construction site during construction. (2) Plan compliance under Subsection C(1) shall be determined using the Wisconsin Department of Natural Resources' Construction Site Soil Loss and Sediment Discharge Calculation Guidance (effective June 2015 or current version), or another commonly accepted soil erosion Formatted: Numbered + Level: 1 + Numbering Style: 1, 2, 3, … + Start at: 1 + Alignment: Left + Aligned at: 1.25" + Indent at: 1.5" Village of Cottage Grove, WI § 163-10 COTTAGE GROVE CODE § 163-12 Downloaded from https://ecode360.com/CO1851 on 2026-08-21 methodology approved by the Dane County Conservationist, that considers season of year, site characteristics, soil erodibility and slope. (3) Erosion control measures for plan approval need not attempt to regulate soil transportation within the boundaries of the applicant's site. (4) Implementation. Permittees shall implement BMPS as follows: (a) Erosion and sediment control practices shall be constructed or installed before land disturbing activities begin. (b) Erosion and sediment control practices must be maintained until final stabilization. (c) Final s activity shall commence when land disturbing activity ceases and final grade has been reached on any portion of the site. (d) Temporary stabilization activity shall commence when land disturbing activity has temporarily ceased and will not resume for a period exceeding 14 calendar days. (e) BMPs that are no longer necessary for erosion and sediment control must be removed. (5) Grading within (5) feet of property line. Except as authorized in this section, the topography within five (5) feet of any property line shall remain unchanged during development. (a) When land disturbing activity associated with development occurs within five (5) feet of any property line, finished grades in that ar ea shall be restored to the topography in existence before the land disturbing activity began. A positive slope of one-half (1/2) inch vertical per one (1) foot horizontal within five (5) feet of the property line is allowed to provide proper drainage away from a one or two family residence. (b) The established grade of the adjoining property shall determine the finished grade at the property line for any development. The owner of the property under development bears the burden of proof as to the established grade at the property line and the topography within five (5) feet of the property line. (c) Existing drainage ways and drainage easements along property lines shall be maintained including, but not limited to, natural watercourses and stormwater management areas shown on plats and certified survey maps. (d) Development in Floodplain Districts requiring fill to comply with Village ordinances is exempt from this subsection. (e) The director may authorize grading resulting in changes to the existing topography at and within five (5) feet of any property line, if the applicant establishes the following: 1. The intent of the grading and an explanation of its necessity, and 2. Stormwater runoff will not negatively affect adjacent properties. (3) § 163-11. Stormwater management plan requirements. A. Any stormwater management plan must meet th e more stringent requirements between those identified in this Chapter and those identified in the most current Dane County requirements. A.B. Plan materials. Stormwater management plans shall satisfy all of the requirements in Subsection B, and shall address at a minimum the following information: Formatted: Indent: Left: 1.97", No bullets or numbering Formatted: Indent: Left: 1.25", No bullets or numbering Village of Cottage Grove, WI § 163-10 COTTAGE GROVE CODE § 163-13 Downloaded from https://ecode360.com/CO1851 on 2026-08-21 (1) A narrative describing the proposed project, including implementation schedule for planned practices; (2) Identification of the entity responsible for long-term maintenance of the project; (3) A map showing drainage areas for each watershed area; (4) A summary of runoff peak flow rate calculations, by watershed area, including: (a) Preexisting peak flow rates; (b) Post-construction peak flow rates with no detention; (c) Post-construction peak flow rates with detention; (d) Assumed runoff curve numbers (RCNs); and (e) Time of concentration (Tc) used in calculations. (5) A complete site plan and specifications, sign ed by the person who designed the plan. All plans shall be drawn to an easily legible scale, shall be clearly labeled, and shall include, at a minimum, all of the following information: (a) Property lines and lot dimensions; (b) All buildings and outdoor uses, existing and proposed, including all dimensions and setbacks; (c) All public and private roads, interior roads, driveways and parking lots. Show traffic patterns and type of paving and surfacing material; (d) All natural and artificial water features, including, but not limited to, lakes, ponds, streams (including intermittent streams), and ditches. Show ordinary high-water marks of all navigable waters, one-hundred-year flood elevations and delineated wetland boundaries, if any. If not available, appropriate flood zone determination or wetland delineation, or both, may be required at the applicant's expense; (e) Protective areas as defined in Subsection B(7)(a); (f) Depth to bedrock; (g) Depth to seasonal high-water table; (h) The extent and location of all soil types as described in the Dane County Soil Survey, Village of Cottage Grove, WI § 163-11 EROSION, SEDIMENT AND WATER RUNOFF § 163-11 Downloaded from https://ecode360.com/CO1851 on 2026-08-21 slopes exceeding 12%, and areas of natural woodland or prairie; (i) Existing and proposed elevations (referenced to the North American Vertical Datum of 1988, where available) and existing and proposed contours in the area requiring a grading and filling permit; (j) Elevations, sections, profiles, and details as needed to describe all natural and artificial features of the project; (k) Soil erosion control and overland runoff control measures, including runoff calculations as appropriate; (l) Detailed construction schedule; (m) Copies of permits or permit applications requ ired by any other governmental entities or agencies; (n) Any other information necessary to reasonably determine the location, nature and condition of any physical or environmental features; (o) Location of all stormwater management practices; (p) All existing and proposed drainage features; (q) The location and area of all proposed impervious surfaces; and (r) The limits and area of the disturbed area. (6) Engineered designs for all structural management practices; (7) A description of methods to control oil and grease or written justification for not providing such control; (8) A maintenance plan and schedule for all perm anent stormwater management practices as recorded on the affidavit required in § 163-9C(3). (9) If necessary, a description and plans to control temperature of runoff. (10) A summary of infiltration calculations including: (a) Pre-development infiltration volume. (b) Calculated infiltration volume goal. (c) Achieved post-development infiltration volume. (8)(11) Flood elevation for a 200-year design storm and proposed minimum opening elevation. B.C. Stormwater management performance standards. Proposed de sign, suggested location and phased implementation of effective, practicable stormwater management measures for plans shall be designed, engineered and implemented to achieve the following results: (1) Sediment control. (a) For new development, design practices to retain soil particles greater than five microns on the site resulting from a one-year twenty-fou r-hour storm event (2.5 inches over twenty- four-hour duration), according to approve d procedures, and assuming no sediment resuspension; or design practices to achieve an eighty-percent reduction in sediment loads based on average annual rainfall.* Village of Cottage Grove, WI § 163-11 EROSION, SEDIMENT AND WATER RUNOFF § 163-11 Downloaded from https://ecode360.com/CO1851 on 2026-08-21 [1] For new development, design practices to achieve a fifty-four-percent reduction in total phosphorus loads based on average annual rainfall. (b) For redevelopment resulting in exposed surface parking lots and associated traffic areas, design practices to achieve th e following reductions in sedi ment loads based on average annual rainfall: 55% for sites within the Ko shkonong watershed, and 62% for sites within the Yahara watershed. Downloaded from https://ecode360.com/CO1851 on 2026-08-21 Village of Cottage Grove, WI § 163-11 COTTAGE GROVE CODE § 163-11 [1] For redevelopment resulting in exposed surface parking lots and associated traffic areas, design practices to achieve a 54% reduction in total phosphorus loads based on average annual rainfall. [2] Under no circumstances shall the site's existing sediment or phosphorus control level or trapping efficiency be reduced as a result of the redevelopment. [3] Note: the 80% reduction based on average annual rainfall standard and the five- micron particle trapping standard are considered generally equivalent. (2) Oil and grease control. For all stormwater plans for commercial or industrial developments and all other uses where the potential for pollution by oil or grease, or both, exists, the first 0.5 inch of runoff will be treated using the best oil and grease removal technology available. This requirement may be waived by the plan reviewer only when the applicant can demonstrate that installation of such practices is not necessary. (3) Runoff rate control, hydrologic calculations. A ll runoff calculations shall be according to the methodology described in the Na tural Resources Conservation Service's Technical Release 55, "Urban Hydrology for Small Watersheds" (commonly known as TR-55), or other methodology approved by the Dane County Conservationist. The maximum runoff curve number (RCN) used in such calculation shall be the TR-55 specified curve numbers for other land uses shall be used for predevelopment conditions. For post-development conditions, heavily disturbed sites will be lowered one permeability class for hydrologic cal culations. Lightly disturbed areas require no modification. Where practices have been implemented to restore soil structure to predeveloped conditions, no permeability class modification is required. Table 1 - Maximum Predevelopment Runoff Curve Numbers Runoff Curve Number Hydrologic Soil Group* A B C D Woodland 30 55 70 77 Grassland 39 61 71 78 Cropland 51 68 78 83 NOTE: * When dual HSGs are specified, the drained condition shall be assumed. (4) Runoff rate control, design standards. Hydrologic analyses shall utilize the MSE4 NRCS rainfall distribution. Except for redevelopment projects, all stormwater facilities shall be designed, installed and maintained to effectively accomplish the following: (a) Maintain predevelopment peak runoff rates for the one-year, twenty-four-hour storm event (2.49 inches over 24 hours' duration). (b) Maintain predevelopment peak runoff rates for the two-year, twenty-four-hour storm event (2.84 inches over 24 hours' duration). (c) Maintain predevelopment peak runoff rates for the ten-year, twenty-four-hour storm event (4.09 inches over 24 hours' duration). Downloaded from https://ecode360.com/CO1851 on 2026-08-21 Village of Cottage Grove, WI § 163-11 EROSION, SEDIMENT AND WATER RUNOFF § 163-11 (d) Maintain predevelopment peak runoff rates for the one-h undred-year, twenty-four-hour storm event (6.66 inches over 24 hours' duration). (d)(e) Maintain predevelopment peak runoff rates fo r a two-hundred year, twenty four hour storm event (7.53 inches over 24 hours’ duration). (5) Outlets. Discharges from new construction sites must have a stable outlet capable of carrying designed flow as required in Subsection B(4), at a nonerosive velocity. Outlet design must consider flow capacity and flow duration. This requirement applies to both the site outlet and the ultimate outlet to stormwater conveyance or water body. (6) Infiltration. (a) For both residential and nonresidential deve lopments, design practices to infiltrate sufficient runoff volume so that post-development infiltration volume shall be at least 90% of pre-development infiltration volume, based on average annual rainfall. (b) If, when designing appropriate infiltration systems, more than 2% of the site is required to be used as effective infiltration area, the applicant may alternately design infiltration systems and pervious surfaces to meet or exceed the annual predevelopment recharge rate. The annual predevelopment recharge rate shall be determined from the Wisconsin Geological and Natural History Survey's 2009 Report, Groundwater Recharge in Dane County, Estimated by a GIS-Based Water-Balance d Model, or subsequent updates to this report, or by a site-specific analysis using other appropriate techniques. If this alternative design approach is taken, at least 2% of the site must be used for infiltration. (c) Pretreatment. Before infiltrating runoff, pret reatment shall be required for parking lot runoff and for runoff from new road construction in commercial, industrial and institutional areas that will enter an infiltration system. The pretreatment shall conform to the design standards in section 163-4 and be designed to protect the infiltration system from clogging prior to scheduled maintenance and to protect groundwater quality. (d) Separation distances. Infiltration practices shall be located so that the characteristics of the soil and the separation distance between the bottom of the infiltration system and the elevation of seasonal high groundwater or the top of competent bedrock are shown in Table 2. Table 2 Source Area Separation Distance Soil Characteristics Industrial, Commercial, Institutional, Parking Lots, and Roads 5 feet or more Filtering layer Residential arterial roads 5 feet or more Filtering layer Roofs draining to subsurface infiltration practices 1 foot or more Native or engineered soil with particles finer than coarse sand Roofs draining to surface infiltration practices Not applicable Not applicable All other impervious source areas 5 feet or more Filtering layer Formatted: Indent: Left: 1.25", No bullets or numbering Formatted: Centered, Indent: Left: 1.25", No bullets or numbering Formatted: No bullets or numbering Formatted: No bullets or numbering Formatted: No bullets or numbering Formatted: No bullets or numbering Formatted: No bullets or numbering Formatted: No bullets or numbering Downloaded from https://ecode360.com/CO1851 on 2026-08-21 (c) (d)(e) Prohibitions. Notwithstanding Subsection B(6)(a) through (c), infiltration systems may not be installed in any of the following areas: [1] Areas associated with Tier 1 industrial facilities identified in s. NR 216.21(2)(a), Wis. Admin. Code, including storage, loading, rooftop and parking. [2] Storage and loading areas of Tier 2 indus trial facilities identified in s. NR 216.21(2)(b). Wis. Admin. Code. [3] Fueling and vehicle maintenance areas. [4] Areas within 1,000 feet up gradient or within 100 feet down gradient of karst features or direct conduits to groundwater. [5] Areas with less than three feet separation distance from bottom of the infiltration system to the elevation of seasonal high groundwater or the top of bedrock, except that this provision does not prohibit infiltration of roof runoff. [6] Areas with runoff from industrial, commercial and institutional parking lots and roads and residential arterial roads with less than five feet separation distance from the bottom of the infiltration system to the elevation of seasonal high groundwater or the top of bedrock. [7] Areas within 400 feet of a community water system well as specified in s. NR Formatted: Indent: Left: 1.25", No bullets or numbering Village of Cottage Grove, WI § 163-11 COTTAGE GROVE CODE § 163-11 Downloaded from https://ecode360.com/CO1851 on 2026-08-21 811.16(4), Wis. Admin. Code, for runoff infiltrated from commercial, industrial and institutional land uses or regional devices for residential development. [8] Areas where contaminants of concern, as defined in s. NR 720.03(2), Wis. Admin. Code, are present in the soil through which infiltration will occur. [9] Any area where the soil does not exhibit one of the following characteristics between the bottom of the infiltration system and the seasonal high groundwater and top of bedrock: at least a five-foot soil layer with 10% fines or greater. This provision does not apply where the soil medium within the infiltration system provides an equivalent level of protection and does not prohibit infiltration of roof runoff. (e)(f) Alternate use of runoff. Where alternate uses of runoff are employed, such as flushing, laundry or irrigation, such alternate use shall be given equal credit toward the infiltration volume required by this section. (g) Minimizing groundwater pollution. According to ch. NR 151, Wis. Admin. Code, infiltration systems designed in accordance with this section shall, to the extent technically and economically feasible, minimize the level of pollutants infiltrating to groundwater and shall maintain compliance with the preventive action limit at a point of standards application in accordance with ch. NR 140, Wi s. Admin. Code. Howeve r, if site-specific information indicates that compliance with th e preventive action limit is not achievable, the infiltration system may be not installed or shall be modified to prevent infiltration to the maximum extent practicable. (f)(h) The maximum pre-development runoff curve nu mber (RCN) used in such calculations shall be those shown in Table 1. (7) Protective areas. (a) All sites, except those exempted under § 163-7D, shall be designed to maintain a protective area of the following minimum protective area widths: [1] For outstanding resource waters and exceptional resource waters, and for wetlands in areas of special natural resource interest as specified in s. NR 103.04, 75 feet. [2] For perennial and intermittent streams identified on a United States geological survey 7.5-minute series topographic map, or a co unty soil survey map, whichever is more current, 50 feet. [3] For lakes, 50 feet. [4] For highly susceptible wetlands, 50 feet. Highly susceptible wetlands include the following types: fens, sedge meadows, bogs, low prairies, conifer swamps, shrub swamps, other forested wetlands, fresh wet meadows, shallow marshes, deep marshes and seasonally flooded basins. Wetland bound ary delineations shall be made in accordance with s. NR 103.08(1m). This subsection does not apply to wetlands that have been completely filled in accordanc e with all applicable state and federal regulations. The protective area for wetlands that have been partially filled in accordance with all applicable state and federal regulations shall be measured from the wetland boundary delineation after fill has been placed. [5] For less susceptible wetlands, 10% of the average wetland width, but no less than 10 feet, nor more than 30 feet. Less susceptible wetlands include degraded wetlands dominated by invasive species such as reed canary grass; cultivated hydric soils; and any gravel pits, dredged material or fill material disposal sites that take on the Village of Cottage Grove, WI § 163-11 EROSION, SEDIMENT AND WATER RUNOFF § 163-12 Downloaded from https://ecode360.com/CO1851 on 2026-08-21 attributes of a wetland. [6] For concentrated flow channels with drainage areas greater than 130 acres, 10 feet. [7] In Subsection B(7)(a)[1], [4] and [5], determinations of the extent of the protective area adjacent to wetlands shall be made on the basis of the sensitivity and runoff susceptibility of the wetland in accordance with the standards and criteria in s. NR 103.03, Wis. Adm. Code. (b) The following requirements shall be met in protective areas: [1] Impervious surfaces shall be kept out of the protective area to the maximum extent practicable. The stormwater management plan shall contain a written site-specific explanation for any parts of the protective area that are disturbed during construction. [2] Where land-disturbing construction activity occurs within a protective area, and where no impervious surface is present, ad equate sod or self-sustaining vegetative cover of 70% or greater shall be established and maintained. The adequate sod or self- sustaining vegetative cover shall be su fficient to provide for bank stability, maintenance of fish habitat and filtering of pollutants from upslope overland flow areas under sheet flow conditions. Nonvegetative materials, such as rock riprap, may be employed on the bank as necessary to prev ent erosion, such as on steep slopes or where high velocity flows occur. [3] Best management practices, such as filter strips, swales, or wet detention basins, that are designed to control pollutants from nonpoint sources may be located in the protective area. C.D. Stormwater management goals. The following standards shall be met whenever possible, and proposed design, suggested location and implementatio n of practices to meet these goals shall be included in plans: (1) For existing development, design practices to retain soil particles greater than 40 microns on the site (twenty-percent reduction) resulting fro m a one-year twenty-four-hour storm event, according to approved procedures, and assuming no sediment resuspension. (2) For street reconstruction, design practices to retain soil particles greater than 20 microns on the site (forty-percent reduction) resulting from a one-year, twenty-four-hour storm event, according to approved procedures, and assuming no sediment resuspension. D.E. Control measures. All water runoff control measures shall require approval of the Village Engineer. Control measures may include, but are not limited to, infiltration basins, detention ponds, and swales. In addition to the following technical standards referred to in § 163-4, control measures installed within the Village must be designed and constructed according to the following standards: (1) All slopes shall be at least 4:1 or flatter (four feet horizontal to one foot vertical). § 163-12. Regulations for lands or activities not otherwise subject to this chapter. Notwithstanding any other provisions of this chapter, it shall be a violation of this chapter for any person to create, permit, establish, maintain or allow to be maintained any condition or activity that causes excessive runoff or erosion to adjacent land, public streets or water bodies. Penalties and remedies may be sought for such activities as provided in § 163-17. Erosion and runoff is excessive when in the opinion of the Village of Cottage Grove, WI § 163-12 COTTAGE GROVE CODE § 163-14 Downloaded from https://ecode360.com/CO1851 on 2026-08-21 Village Engineer or Building Inspector an unsafe cond ition results in the streets, sedimentation occurs in lakes and streams, environmentally sensitive lands are threatened, runoff endangers downstream property, or the public health, safety or gene ral welfare of the citizens of the Village of Cottage Grove is otherwise threatened or harmed. § 163-13. Off-site st ormwater management. A. When the Village Board determines, based on a drainage study conducted and prepared by a qualified professional engineer, that off-site water runoff control measures best serve the interests of the public and the environment, then the Board may allow or require off-site water runoff control as a condition of approval of a land disturbance pe rmit. When off-site water runoff co ntrol is permitted or required as specified in § 163-11B(4), prio r to final approval by the Board, the permit applicant shall obtain written permission from any and all property owne rs who would experience increases in the amount of water runoff entering their land from a two-, a ten-, or a one-hundred-year, twenty-four-hour design storm or whose property is threatened by virtue of additional soil saturation. The Village Board will act on behalf of any and all affe cted public lands, public drainageways, storm sewers or other public waterways. B. Developments served by off-site stormwater manageme nt facilities will be charged a fee-in-lieu of detention. Fees-in-lieu will be set by the Village and based on the level of service provided to the applicant by the off-site facility. C. Off-site stormwater management is only allowed when all of the following conditions for the off-site facility are met: (1) The facility is in place; (2) The facility is designed and adequately sized to provide a level of stormwater control that at least meets the ordinance standards; (3) The facility has a legally obligated entity responsible for its long-term operation and maintenance. D. Permit applicants may be required to install and maintain temporary facilities designed to meet the standards of this chapter, if an off-site facility that will serve the proposed development is planned but does not yet meet the conditions of Subsection C. Temporary facilities must be maintained by the applicant until that time that the off-site facility meets the conditions of Subsection C. Applicants required to install and maintain temporary facilities will also be charged a fee-in-lieu. § 163-14. Appeals; variances. A. Appeals. (1) Any person aggrieved by any decision of the Village Agent pursuant to this chapter may appeal to the Zoning Board of Appeals. Such appeal shall be taken within 30 days after the challenged decision. Notice of appeal setting forth the specific grounds for the appeal shall be filed with the Village Clerk. A fee of an amount set by the Village in the annual fee schedule resolution must accompany any appeal request involving a land-disturbing activity. The Zoning Administrator shall forthwith transmit to the Zoning Board of Appeals the record upon which the action appealed from was taken. (2) The Zoning Board of Appeals shall publish a Class 2 notice thereof under ch. 985, Wis. Stats., Village of Cottage Grove, WI § 163-14 EROSION, SEDIMENT AND WATER RUNOFF § 163-15 Downloaded from https://ecode360.com/CO1851 on 2026-08-21 as well as give due notice to the parties in interest. The Board shall hear and decide variance and appeal requests within 30 days of receipt of written request and payment of the appeal fee. Upon the hearing any party may appear in person or by agent or attorney. (3) The Zoning Board of Appeals may, in conformity with the provisions of this chapter, reverse or affirm, wholly or partly, or mo dify the order, requirement, deci sion or determination appealed from and may make such order, requirement decision or determination as ought to be made, and shall have all the powers of the officer from whom the appeal is taken. (4) The concurring vote of a majority of the Zoning Board of Appeals shall be necessary to reverse the decision of the Village Engineer. B. Variances. (1) An applicant may include in the application a re quest for a variance from the requirements of § 163-10 or § 163-11. No variance shall be gr anted unless the applicant demonstrates and the Village Engineer, in consultation with the Zoning Administrator, finds that all of the following conditions are present: (a) Enforcement of the standards set forth in this chapter will result in unnecessary hardship to the landowner; (b) The hardship is due to exceptional physical conditions unique to the property; (c) Granting the variance will not adversely affect th e public health, safety or welfare, nor be contrary to the spirit, purpose and intent of this chapter; (d) The project will have no impact upon any of the stated purposes of this chapter as set forth in § 163-1C; (e) The applicant has proposed an alternative to the requirement from which the variance is sought that will provide equivalent protection of the public health, safety and welfare, the environment and public and private property; (f) The net cumulative effect of the variance will not impact downstream conditions; and (g) Existing regional facilities are shown to meet the performance standards of this chapter. (2) If all of the conditions set forth in Subsection B(1) are met, a variance may only be granted to the minimum extent necessary to afford relief from the unnecessary hardship, with primary consideration to water quality. (3) A variance from the provisions of § 163-11B(1) and (2) may only be granted if: (a) The applicant has met the requirements of § 163-14B(1); and (b) The applicant will be denied all reasonable and beneficial use of the property if the variance is denied. (4) A person aggrieved by a vari ance determination by the Village Engineer and/or Zoning Administrator may appeal the decision to the Zoning Board of Appeals pursuant to Subsection B(1). (5) A person aggrieved by a decision of the Zoni ng Board of Appeals regarding a variance may appeal that decision to Dane County Circuit Court. Village of Cottage Grove, WI § 163-15 COTTAGE GROVE CODE § 163-16 Downloaded from https://ecode360.com/CO1851 on 2026-08-21 § 163-15. Permit fees. A. Major. The application fee for a major land-disturbing activity permit shall be an amount set by Village in the annual fee schedule resolution, of which a portion will cover administration and inspections, and the remainder will be a deposit which is refundable unless violations occur and have to be taken care of by the Village. In addition to this fee, before any permit will be issued, the applicant must pay the actual engineering fees or expenses incurred by the Village in connection with review of the control plan and the engineering fees or expenses estimated to be incurred for on-site inspection during the project. Where plat or certified survey map review fees are paid pursuant to Chapters 23, 274 and 325 of the Village Ordinances for the same project covered by the proposed land-disturbing activity permit, then the application fee will be waived. Where the application fee is waived, the applicant must still pay engineering and inspection fees and expenses; however, such fees and expenses shall not be duplicative of any engineering or inspection fees paid in connection with plat or certified survey map approval. B. Minor. The application fee for a minor land-disturbing activity permit shall be an amount set by the Village in the annual fee schedule resolution, of which a portion will cover administration and inspections, and the remainder will be a deposit, which is refundable unless violations occur and have to be taken care of by the Village. C. Village activity. No permit or fees are required for Village activity. D. The permit fee shall be payable at the time an application for either an erosion control or a stormwater management permit, or both, is submitted. § 163-16. Enforcement. A. Stop-work order. (1) Whenever the Village Agent finds any noncompliance with the provisions of this chapter, the Village Agent shall attempt to communicate with the owner or person performing the work to obtain immediate and voluntary compliance if such person is readily available. If the owner or person performing the work is not readily availabl e, that person refuses to voluntarily comply immediately or the noncompliance presents an im minent danger or will cause or threatens to cause bodily injury or damage to off-site proper ty, including, but not lim ited to off-site runoff, the Village Agent shall post in a conspicuous pl ace on the premises, a stop-work order which shall cause all activity not necessary to correct the noncompliance to cease until noncompliance is corrected. (2) The stop-work order shall provide the following information: date of issuance, an adequate identification of the property subject to the stop-work order, reason for posting and the signature of the inspector posting the card. (3) It shall be a violation of the chapter for the un authorized removal of the stop-work order from the premises. B. In addition to posting a stop-work order, the Village Agent shall provide notification to the owner or contractor by personal service, written notice by certified mail, or facsimile transmission. (1) The permittee, landowner and c ontractor shall have 24 hours from the time and date of notification by the Village Agent to correct any noncompliance with the plan when notification is by either personal communication of noncomp liance to the owner or contractor or their Village of Cottage Grove, WI § 163-16 EROSION, SEDIMENT AND WATER RUNOFF § 163-17 Downloaded from https://ecode360.com/CO1851 on 2026-08-21 respective agents or written notice sent by certified mail to the owner or contractor. (2) If notice is not provided under Subsection B(1) the permittee and landowner shall have 72 hours to correct any noncompliance with the plan when notification is by posting notice in a conspicuous place on the site or sending notice by facsimile transmission to owner or contractor. C. If any noncompliance is not corrected within the time periods specified in Subsection B(1) or (2), the permittee and landowner authorize the Village Agent to take any action, to perform any work, or commence any operations necessary to correct c onditions upon the subject property where notice of noncompliance has been issued to bring the property into conformance with plan requirements. The permittee and landowner further consent to reimburse the authority for the total costs and expenses of the aforementioned actions; said reimbursement may be collected as a special charge upon the property for current services rendered as provided by law. D. If the permittee has filed an appeal under § 163-14A prior to the expiration of the time for compliance under § 163-16B, the Village Agent may take action, perform work or correct conditions only to the extent necessary to protect agains t or correct an imminent hazard or a condition that will cause or threatens to cause personal injury or damage to off-site property. E. Revocation of permit. Where a stop-work order has been issued in order to obtain compliance with a control plan and the permittee does not cease the illegal activity or obtain compliance with the control plan or permit conditions within the time period sp ecified in Subsection B(1) or (2), the Village may revoke the permit issuance of the stop-work order. Permits for major land-disturbing activities may be revoked by the Village Engineer or his design ee; permits for minor land-disturbing activities may be revoked by the Erosion Control Officer, Building Inspector or Village Engineer. F. Private remedies preserved. These enforcement provisions are not intended in any way to restrict or limit the rights of private parties to pursue whatev er private legal remedies they may have available as a result of any erosion, sediment or water runoff. § 163-17. Violations and penalties. A. Any person or persons, firm, company or corporation, owner, occupant or other user of the premises who violates, disobeys, omits, neglects or refuses to comply with or resists the enforcement of any of the provisions of this chapter shall be subject to a forfeiture of not less than $200 nor more than $2,000 plus the actual costs of prosecution for each offense for major land-disturbing activities, and not less than $50 nor more than $500, plus the actual costs of prosecutions of each offense, for minor land-disturbing activities. Each day that a violation exists shall constitute a separate offense. B. Any person who has the ability to pay any forfeiture entered against him or her under this chapter but refuses to do so may be confined in the county jail until such forfeiture is paid, but in no event to exceed 30 days. In determining whether an individual has the ability to pay a forfeiture, all items of income and all assets may be considered regardless of whether or not such income or assets are subject to garnishment, lien or attachment by creditors. C. As a substitute for or as an addition to forfeiture actions under Subsection A or corrective action under § 163-16C, the Village Attorney is authorized to seek enforcement of any part of this chapter by court action seeking injunctive relief. It shall not be necessary for the Village Attorney to take corrective action or prosecute for forfeiture before resorting to injunctive relief. § 163-18. Technical Standards and Specifications. The design of all best management practices designed to meet the requirements of this chapter shall comply with the following technical standards: Formatted: Font: Bold Formatted: Indent: First line: 0.5" Formatted: Indent: Left: 0.25" Village of Cottage Grove, WI § 163-16 EROSION, SEDIMENT AND WATER RUNOFF § 163-17 Downloaded from https://ecode360.com/CO1851 on 2026-08-21 A. Natural Resources Conservation Service’s “Wisconsin Field Office Technical Guide, Chapter 4” or its successor. B. Applicable construction or erosion control standards established by the Wisconsin Department of Natural Resources or State of Wisconsin. C. Any other technical methodology established by Dane County. § 163-19. Interpretation. The interpretation and application of this chapter shall be interpreted and liberally construed in the favor of the Village, and nothing in this chapter will be construed as a limitation or repeal of any power granted by Wisconsin law. § 163-20. Severability. If any portion of this chapter is ruled unenforceable or invalid by a court, the remainder of this chapter shall not be rendered invalid, ineffective, or unenforceable. Formatted: Font: Bold Formatted: Font: Bold Formatted: Indent: Left: 0" ORDINANCE 18-2026 REPEALING AND RECREATING CHAPTER 312 OF THE VILLAGE OF COTTAGE GROVE CODE OF ORDINANCES The Village Board of the Village of Cottage Grove, Dane County, Wisconsin, does hereby ordain as follows: Recitals A. The Village of Cottage Grove operates and maintains a comprehensive stormwater management system designed to collect, treat, and discharge stormwater. B. Costs for operating, maintaining, and constructing facilities are currently paid for from the Village’s general levy. C. Wis. Stat. § 66.0821 grants the Village the authority to implement a stormwater utility and to fund the stormwater utility via service charges. D. The Village desires to create a stormwater utility to manage the operation and maintenance of the Village’s stormwater system, and to fund the utility using service charges. E. The Village desires to amend chapter 312 of the Village of Cottage Grove Code of Ordinances to create the stormwater utility and make other amendments to coincide with current utility practices. Ordinance Section 1. Chapter 312 of the Village of Cottage Grove Code of Ordinances is hereby repealed and replaced in its entirety with Exhibit A to this Ordinance. Section 2. This Ordinance is conditioned upon the Village of Cottage Grove Utility Commission establishing an initial equivalent residential unit charge not to exceed $8.90 per month for the year 2027. If the Utility Commission establishes a charge that exceeds $8.90 per month, then this Ordinance shall be null and void. Section 3. This Ordinance shall become effective upon the condition in Section 2 being satisfied and publication and notice of this Ordinance required by Wisconsin statutes. BY ORDER OF THE VILLAGE BOARD VILLAGE OF COTTAGE GROVE _________________________________ Cynthia Kelm-Nelson, Village President ATTEST: _________________________________ Lisa Kalata, Village Clerk EXHIBIT A Chapter 312 WATER, SEWERS AND STORMWATER MANAGEMENT ARTICLE I Administration § 312-1. Agreement to comply with rules and regulations. All persons now receiving a water supply from the Utility, or who may hereafter make application therefor, shall be considered as having agreed to be bound by all rules and regulations as filed with the State Public Service Commission. § 312-2. Public Service Commission rules adopted. The following provisions of Chapter PSC 185, Wis. Adm. Code, are adopted by reference and made a part of these rules as if set forth in full. A violation of any of such rules shall constitute a violation of this section and shall be punishable as provided in § 312-10. 185.11 Authorization for and Application of Rules. 185.12 Definitions. 185.13 General Requirements. 185.15 Free or Discriminatory Service Prohibited. 185.16 Protection of Utility Facilities. 185.17 Interference with Public Service Structures. 185.18 Location of Records. 185.19 Retention of Records. 185.21 Schedules to be Filed with the Commission. 185.22 Information Available to Customers. 185.31 Metered Service. 185.32 Meter Readings and Billing Periods. 185.33 Billing. 185.35 Adjustment of Bills. 185.36 Deposits. 185.37 Disconnection and Refusal of Service. 185.38 Deferred Payment Agreement. 185.39 Dispute Procedures. 185.41 Employees Authorized to Enter Customers' Premises. 185.42 Customer Complaints. 185.43 Construction Records. 185.44 Records and Reports of Service Interruptions. 185.45 Pumpage Records. 185.46 Metering Equipment Records. 185.47 Other Records. 185.51 Requirement for Good Engineering Practice. 185.52 Construction Standards. 185.61 Meters. 185.65 Accuracy Requirements for Customer Meters. 185.71 Meter Testing Facilities and Equipment. 185.72 Calibration of Meter Testing Equipment. 185.73 Testing of Customer Meters. 185.74 Test Flows. 185.75 Required Tests of Customer Meters. 185.76 Periodic Tests. 185.77 Complaint Tests. 185.78 Referee Tests. 185.79 Testing of Metering Installations Having Remote Registers. 185.795 Jumpering Meter Settings. 185.81 Quality of Water. 185.815 Adequacy of Water Supply. 185.82 Pressure Standards. 185.83 Station Meters. 185.84 Emergency Operation. 185.85 System Losses. 185.86 Flushing Mains. 185.87 Operation of Distribution System Valves and Hydrants. 185.88 Interruptions of Service. 185.89 Thawing Frozen Services. § 312-3. Utility Commission. [Amended 4-20-1987] A. Composition. The Commission shall be comprised of one Village Board member and four citizen members. B. Appointments. (1) Village Board member. The Village Board member of the Commission shall be appointed by the Village President subject to confirmation by the Village Board. The Board member shall serve for a two -year term commencing May 1 or until his/her successor is appoi nted and confirmed by the Board. Only one member of the Village Board shall be a member of the Utility Commission at any one time. (2) Citizen members. The citizen members of the Commission shall be appointed by the Village President subject to confirmation by the Village Board. The citizen members shall serve for two-year terms commencing May 1 or until their successors are appointed and confirmed by the Board. The term of the new citizen member appointed pursuant to the May 1991 ordinance change shall be for one year. Subsequent terms are to be staggered so not more than two such appointments are made annually. C. Duties and responsibilities. (1) The Utility Commission shall be organized and function in accordance with the provisions of Chapter 196 of the Wisconsin Statutes, under existing ordinances, rules, policies and regulations of the Cottage Grove Utility Commission as of the date of adoption hereof, and any and all applicable state or local laws or regulations pertaining to the operations of water and sewer utilities. (2) The express purpose of this section is to create a Commission to independently operate the Village Water, Sewer, and Stormwater Utility as empowered and regulated by state laws and to perform its functions separately from the Village Board and to be direct ly answerable to the Village Board as well as the State of Wisconsin. (3) The Utility Commission shall have the power to determine an emergency exists pursuant to s. 62.15(1b), Wis. Stats., for bidding purposes. ARTICLE II Regulations § 312-4. Compulsory connection to water system. A. Notice to connect. Whenever the public water system becomes available to any public, commercial, mercantile or business building or any building used for human habitation, the Public Works and Utilities Director shall notify in writing the owner, agent or occupant thereof to connect thereto all facilities required by the Village. If the person to whom notice has been given fails to comply within 120 days after notice, the Public Works and Utilities Director shall cause the necessary connections to be made, and the expense thereof shall be assessed as a special tax against the property pursuant to s. 281.45, Wis. Stats. B. Deferred payment. The owner or his or her agent or the occupant may, within 30 days after the completion of the work, file a written option with the Village Treasurer electing to pay the amount of the assessment in five equal annual installments with interest on the unpaid balance at .5% over the Village's rate of interest per year. C. Privies and waterless toilets prohibited. After connection of any building to a sewer main hereunder, no privy or waterless toilet shall be used in connection with such building. § 312-5. Cross-connection control. A. Cross-connection defined. Any physical connection or arrangement between two otherwise separate systems, one of which contains potable water from the Village water system and the other water from a private source, water of unknown or questionable safety or steam, gases or chemicals whereby there may be a flow from one system to the other, the direction of flow depending on the pressure differential between the two systems. B. Cross-connections prohibited. No person shall establish or permit to be established or maintain or permit to be maintained any cross -connection. No interconnection shall be established whereby potable water from a private, auxiliary or emergency water supply other than the regular public water supply of the Village may enter the supply or distribution system of the Village unless such private, auxiliary or emergency water supply and the method of connection and use of such supply shall have been approved by the Utility Commission and the Wisconsin Department of Natural Resources in accordance with Section NR 111.25(3), Wis. Adm. Code. C. The Utility Department may inspect, or arrange for an inspection of, property served by the public water system for cross connections. The frequency of inspections shall be established by the Utility Department, approved by the Wisconsin Department of Natural Resources and in accordance with Wisconsin Administrative Code. Any unprotected cross -connection identified by the inspection shall be promptly corrected. Failure to promptly correct an unprotected cross-connection shall be sufficient cause for the Utility to discontinue water service to the property, as provided by this chapter. D. Right of entry. No person shall refuse entry to any representative of the Utility Department upon presentation of credentials at any reasonable time to examine for cross-connections any property served by a connection to the public water system of the Village. If entry is refused, the representative shall obtain a special inspection warrant under § 66.122, Wis. Stats. On request, the owner, lessee or occupant of any property so served shall furnish to the inspection agency any pertinent information regarding the piping system or systems on such property. E. Discontinuation of service. (1) Authorized. The Utility Department is authorized and directed to discontinue water service to any property wherein any connection in violation of this section exists and to take such other precautionary measures deemed necessary to eliminate any danger of contamination of the public water system. (2) Notice required. Water service shall be discontinued only after reasonable notice and opportunity for hearing under Ch. 68, Wis. Stats., except as provided in Subsection E(3). Water service to such property shall not be restored until the cross-connection has been eliminated in compliance with the provisions of this section. (3) Service may be discontinued if a cross -connection or an emergency endangers public health, safety or welfare and requires immediate action and a written finding to that effect is filed with the Village Clerk and delivered to the customer's premises. The customer shall have an opportunity for hearing under Ch. 68, Wis. Stats., within 10 days of such emergency discontinuance.1 § 312-6. Private wells. A. Purpose. The purpose of this section is to prevent unused or improperly constructed wells from serving as a passage for contaminated surface or near-surface waters or other materials to reach the usable groundwater. These wells must be properly filled and sealed. B. Application. All private wells located on any premises which is served by the public water system of the Village shall be properly filled. Only those wells for which a well operation permit has been granted by the Village Clerk may be exempted from this requirement, subject to conditions of maintenance and operation. C. Well operation permits. Application for a well operation permit shall be made on forms provided by the Village Clerk. A permit may be granted to a well owner to operate a well for a period not to exceed one year if the following requirements are met: (1) The well and pump installation meet the requirements of Chapter NR 112, Wis. Adm. Code, and a well constructor's report is on file with the Department of Natural Resources, or certification of the acceptability of the well has been granted by the Private Water Supply Section of the Department of Natural Resources. (2) The well has a history of producing safe water and presently produces bacteriologically safe water as evidenced by three samplings two weeks apart. (3) The proposed use of the well can be justified as being necessary in addition to water provided by the public water system. (4) No physical connection shall exist between the piping of the public water system and the private well. D. Abandoned wells to be filled. Wells to be abandoned shall be filled according to the procedures 1. Editor’s Note: Former Subsection F, Discontinuation of service, which immediately followed, was repealed 8-19-2019 by Ord. No. 07-2019. outlined in Chapter NR 112, Wis. Adm. Code. The pump and piping must be removed and the well checked for obstructions prior to plugging. Any obstruction or liner must be removed. E. Reports and inspection. A well abandonment report must be submitted by the well owner to the Department of Natural Resources on forms provided by that agency. Such forms are available at the office of the Village Clerk. The report shall be submitted immediately upon completion of the filling of the well. The filling must be observed by a representative of the Village. § 312-7. Limits on liability for sewer system operation; restrictions on use. A. Liability. The user of the Village sewerage system does so at his or her own risk. The Village is not responsible for any damage caused by failure of the system to convey sewage from the premises. B. Backflow or backwater valves. Building drains subject to backflow or backwater at the time of installation shall be provided with adequate backwater valve, installed to prevent interference with the flow and be readily accessible for cleaning. It is the responsibility of the Village Building Inspector to enforce this provision. It is the responsibility of the user of the Village sewerage system to install adequate backwater protection at such time as the building drain becomes subject to backflow. C. Groundwater discharge. The connection of basement drains, sump pump drains, drain tile or any other drain system the purpose of which is to alleviate a groundwater condition or which may contribute groundwater at any time of the year to the Village sewerage system is prohibited. D. Unpolluted water discharge. Unpolluted water, including but not limited to cooling water, boiler blowdown, swimming pool backwash or drain, shall not be discharged into the Village sewerage system. § 312-8. Operation of valves and hydrants; unauthorized use of water. No person shall, without authority of the Public Works and Utilities Director, allow contractors, masons or other unauthorized persons to take water from the premises, operate any valve connected with the street or supply mains or open any fire hydrant connected with the distribution system, except for the purpose of extinguishing fire, or shall wantonly injure or impair the same. Permits for the use of hydrants for the purchase of bulk water apply only to such hydrants as are designated for such use. § 312-9. Restrictions on water use. No person serviced by the Village Water Utility shall sprinkle or permit or allow the sprinkling of any lawn, garden or premises with water provided by the Village Water Utility except in accordance with a schedule to be issued by the Village President. A. Power of Village President. The Village President shall have the power to issue an emergency declaration regulating the use of water for sprinkling lawns or gardens in the Village. These regulations may be in the form of a ban during certain hours of the day or certain days of the week or an absolute ban on all sprinkling. Before declaring any such regulations, the Village President shall first consult with the Public Works and Utilities Director to determine the abilities of the Utility to supply an adequate supply of water for the Village residents. Said regulations shall be effective until removed as provided herein. B. Notice. The commencement of any regulations regarding sprinkling and the removal of such regulations shall be by notice required by Wisconsin law. The regulations shall be effective immediately upon posting. When no regulations are in effect, sprinkling may be done at any reasonable time. C. Permits. Any person who feels himself or herself aggrieved by such regulations may apply to the Village President for a permit to be exempt from such regulations. No formal notice or hearing shall be necessary for such a permit. Such permit shall be issued only if such regulations cause an unnecessary hardship. A permit shall be issued where new sod or seeding of lawns has been completed within two weeks prior to such regulations. Such permit shall specify the hours during which sprinkling will be permitted, the length of time during which the permit is valid and the property for which the permit is issued. The permit shall be posted on the property where such sprinkling is taking place. Any person whose application for permit is rejected by the Village President may apply to the Village Board for a per mit at its next regular meeting. § 312-10. Violations and penalties. Any person who shall violate any provision of this Part 1 or any regulation, rule or order made hereunder shall be subject to a penalty as provided in Chapter 1, General Provisions, § 1-19 of this Code. Part 2 Sewer Use And Sewer Service Charges ARTICLE III General Provisions § 312-11. Introduction. This Part 2 regulates the use of public and private sewers and drains, connections to the public sewerage system, discharge of septage into the public sewerage system and the discharge of waters and wastes into the public sewerage systems within the Village of Cottage Grove. It also provides for and explains the method used for levying and collecting wastewater treatment service charges, sets uniform requirements for discharges into the wastewater collection and treatment systems and enables the Village to comply with administrative provisions and other discharge criteria which are required or authorized by the State of Wisconsin or federal law. Its intent is to derive the maximum public benefit by regulating the characteristics of wastewater discharged into the sewerage system. § 312-12. Purpose; use of revenue; effect on other regulations. A. This Part 2 provides a means for regulating the use of the public sewers, effectuating connections thereto, determining wastewater volumes, constituents and characteristics, the setting of charges and fees and the issuing of permits to certain users. B. Revenues derived from the application of this Part 2 shall be used to defray the costs of operating and maintaining the wastewater collection and treatment systems and to provide sufficient funds for capital outlay, debt service costs and capital improvements. The charges and fees herein have been established pursuant to requirements of the Wisconsin Statutes. C. This Part 2 shall supersede any previous ordinances, rules or regulations of the Village of Cottage Grove relating to the subject matter hereof and shall repeal all parts thereof that may be inconsistent with this Part 2. If there is any conflict between this Part 2 and any applicable Wisconsin Statute, the Wisconsin Statute shall control in such instance. § 312-13. Curative provisions. All acts or actions performed or done by or on behalf of the Commission or Village prior to the effective date of this Part 2 are hereby ratified, confirmed and declared to be valid. ARTICLE IV Terminology § 312-14. Definitions and word usage. A. Unless the context specifically indicates otherwise, the meaning of terms used in this Part 2 shall be as follows: APPROVING AUTHORITY — The Village of Cottage Grove Utility Commission or its duly authorized committee, agent or representative. BUILDING DRAIN — That part of the lowest horizontal piping of a drainage system which receives the discharge from soil, waste and other drainage pipes inside the walls of the building or structure and conveys it to the building sewer. BUILDING SEWER — The pipe extension beginning at the outside of the inner face of the building wall to a point of connection with the public sewer. CARBONACEOUS BIOCHEMICAL OXYGEN DEMAND (CBOD) — The quantity of oxygen used in the biochemical degradation of organic material in five days at 20° C. when the oxidation of reduced forms of nitrogen is prevented by the addition of an inhibitor. This analytical procedure shall be performed in accordance with Standard Methods. CFR — The Code of Federal Regulations. COMMISSION — The Village of Cottage Grove Utility Commission. COMPATIBLE POLLUTANTS — Carbonaceous biochemical oxygen demand, suspended solids and total kjeldahl nitrogen, plus additional pollutants identified in the WPDES permit for the publicly owned treatment works receiving the pollutant if such works were designed to treat such additional pollutants to a substantial degree. FLOATABLE OIL — Oil, fat or grease in a physical state such that it will separate by gravity from wastewater by treatment in an approved pretreatment facility. A wastewater or septage shall be considered free of floatable fat if it is properly pretreated and the wastewater does not interfere with the collection or treatment system. GARBAGE — The residue from the preparation, cooking and dispensing of food and from the handling, storage and sale of food products and produce. GROUND GARBAGE — The residue from the preparation, cooking and dispensing of food that has been shredded to such degree that all particulates will be no greater than 1/2 inch in any dimension and will be carried freely in suspension under normal flow conditions in sewers. INCOMPATIBLE POLLUTANTS OR WASTEWATER — Wastewater or septage with pollutants of such a strength that will adversely affect or disrupt the wastewater treatment processes or effluent quality or sludge quality if discharged to the sewerage system facility. INDUSTRIAL WASTE — The wastewater from an industrial process, trade or business, as distinct from sanitary sewage, including cooling water and the discharge from sewage pretreatment facilities. MMSD ORDINANCE — The Sewer Use Ordinance of the Madison Metropolitan Sewerage District (herein "MMSD") adopted in September 1984, and any amendments thereto or restatements thereof. MUNICIPAL WASTEWATER — The wastewater of a municipality, including that of the utility. From the standpoint of source, it may be a combination of the liquid and water- carried wastes from residential and commercial buildings, industrial plants and institutions, together with any groundwater, surface water and stormwater that may have inadvertently entered the sewerage system of the municipality. NATURAL OUTLET — Any outlet, including storm sewers, into a watercourse, pond, ditch, lake or other body of surface water or groundwater. PARTS PER MILLION — A weight-to-weight ratio. The parts per million value multiplied by the factor 8.34 shall be equivalent to pounds per million gallons of water. PERSON — Any and all persons, including any individual, firm, company, municipal or private corporation, association, society, institution, enterprise, government agency or other entity. pH — The logarithm of the reciprocal of hydrogen ion concentration. The concentration is the weight of hydrogen ions, in grams per liter of solution. Neutral water, for example, has a pH value of 7 and a hydrogen ion concentration of 10. PUBLIC SEWER — Any sewer owned or provided by or subject to the jurisdiction of the Village or any other municipality. PUBLIC WORKS AND UTILITIES DIRECTOR — The Village Public Works and Utilities Director, or their designee. SANITARY SEWAGE — A combination of liquid and water-carried wastes discharged from toilets and/or sanitary plumbing facilities, together with such groundwater, surface water and stormwater as may have inadvertently entered the sewerage system. SANITARY SEWER — A sewer that carries liquid and water -carried wastes from residences, commercial buildings, industrial plants and institutions, together with small quantities of groundwater, stormwater and surface water that are not admitted intentionally. SEPTAGE — The wastewater or contents of septic or holding tanks, dosing chambers, grease interceptors, seepage beds, seepage pits, seepage trenches, privies or portable rest rooms. SEWERAGE SYSTEM — All structures, conduits and pipes by which sewage is collected, treated and disposed of, except plumbing inside and in connection with buildings served, and service pipes, from building to street main, i.e., a building sewer. SEWER SERVICE CHARGE — A service charge levied on users of the wastewater collection and treatment facilities for payment of use -related capital expenses as well as the operation and maintenance costs, including replacement costs, of said facilities. SEWER SYSTEM — The public sanitary sewers within a sewerage system. The facilities which convey wastewater from individual structures, from private property to the public sanitary sewer, or its equivalent, are specifically excluded from the definition of " sewer system," except that pumping units and pressurized lines for individual structures or groups of structures may be included as part of a "sewer system" when such units are cost effective and are owned and maintained by the Commission in question. Lift stations or pumping stations and all appurtenances thereto are included in this definition. For example, a building sewer is not part of the sewer system. SLUG LOAD — Any substance release at a discharge rate and/or concentration which causes interference to wastewater treatment processes or plugging or surcharging of the sewer system. STANDARD METHODS — The examination and analytical procedures set forth in the most recent edition of "Standard Methods for the Examination of Water, Sewage and Industrial Wastes" published jointly by the American Public Health Association, the American Water Works Association and the Water Pollution Control Federation and in compliance with federal regulations 40 CFR 136, "Guidelines Establishing Test Procedures for Analysis of Pollutants," all as amended from time to time. STATS — The Wisconsin Statutes in effect from time to time. STORM DRAIN — A drain or sewer for conveying water, groundwater, subsurface water or unpolluted water from any source. STORMWATER RUNOFF — That portion of the rainfall that is collected and drained into the storm sewers. SUSPENDED SOLIDS — Solids that either float on the surface of, or are in suspension in, water, wastewater, septage or other liquids and that are removable by laboratory filtering as prescribed in Standard Methods and referred to as "nonfilterable residue." TOTAL KJELDAHL NITROGEN (TKN) — The quantity of organic nitrogen and ammonia as determined in accordance with Standard Methods. TOTAL PHOSOPHORUS (TP) — The quantity of total phosphorus as determined in accordance with the Standard Methods. VILLAGE — The Village of Cottage Grove, a municipal corporation located in Dane County, Wisconsin. VILLAGE BOARD — The Village Board of the Village. WASTEWATER FACILITIES — The structures, equipment and processes required to collect, carry away, store and treat domestic and industrial waste and septage and dispose of the effluent and sludge. WASTEWATER TREATMENT WORKS — An arrangement of devices and structures for treating wastewater, septage, industrial waste and sludge. Sometimes used as synonymous with "waste treatment." WATERCOURSE — A natural or artificial channel for the passage of water, either continuously or intermittently. WPDES — Wisconsin Pollutant Discharge Elimination System. B. "May" is permissible; "shall" is mandatory. ARTICLE V Management, Operation and Control § 312-15. Management vested in Commission; records. The management, operation and control of the sewer system for the Village shall be vested in the Utility Commission. All records, minutes and all written proceedings thereof shall be kept by the Village Clerk. The Finance Director or designee shall keep all the financial records thereof. § 312-16. Construction authority. The Commission shall have the power to construct sewer lines for public use and shall have the power to lay sewer pipes in and through the public alleys, streets, easements, and public grounds located within the Village and generally to do all such work as may be found necessary or convenient in the management of the sewer system. The Commission shall have power by itself, its officers, agents and servants to enter upon any land in the Village for the purpose of making examination or supervising in the performance of its duties under this Part 2, without liability therefor, and the Commission shall have the power to purchase and acquire for the Village for the benefit of the Commission all real and personal property which may be necessary for construction of the sewer system or for any repair, remodeling or additions thereto. § 312-17. Owner's maintenance of building sewer. The owner of property abutting a public sewer shall maintain sewer service from the public sewer main to the structure or building on the owner's property, including all controls between the same, without expense to the Village or Commission, except when they are damaged as a result of negligence or carelessness on the part of the respective Village or Commission. Without intending to limit the generality of the foregoing, the owner has the sole responsibility for the repair and maintenance of all building sewers, and the ownership thereof shall at all times be vested in such property owner. All sewer services must be maintained free of defective conditions by and at the expense of the owner or occupant of the property. When any sewer service is to be relayed and there are two or more buildings on such service, each building shall be disconnected from such service and a new sewer service shall be installed for each building. In the event of any obstruction of, damage to or repair of a building sewer, the same shall be the responsibility of the property owner, except as provided for in § 312-27 hereof or as otherwise provided for herein. § 312-18. Title to real estate and personal property. All property, real, personal and mixed, including but not limited to easements, acquired for the construction of each sewer system, and all plans, specifications, diagrams, papers, books and records connected therewith, and all buildings, machinery and fixtures pertaining thereto, shall be the property of and titled in the name of the Village for the benefit of the Commission. Nothing contained in this Part 2 shall be construed as revoking, changing, abandoning or otherwise altering any conveyance of property previously made to the Village prior to the effective date of this Part 2, and such title shall be deemed to be vested in the Village as provided for herein. § 312-19. Authority of Village and Commission. Nothing contained in this Part 2 shall be construed as limiting the power and authority of the Village or Commission as provided for by applicable Wisconsin Statutes, and the Village and Commission shall have all rights and authority as provided for by law. § 312-20. Taking of real estate. Whenever any real estate or any easement therein or use thereof shall in the judgment of the Commission be necessary to the sewer system, and whenever for any reason an agreement for purchase from the owners cannot be made, the Commission after approval of the Village Board shall proceed with all necessary steps to take such real estate easement or use by condemnation in accordance with the Wisconsin Statutes and any other applicable federal or state provisions. ARTICLE VI Administrative Rules and Regulations § 312-21. Establishment. The following rules and regulations for the government of licensed plumbers, sewer users, property owners and others are hereby adopted and established. § 312-22. General provisions. A. Agreement to rules and regulation. The rules, regulations and sewer rates of the Village and Commission contained herein shall be considered a part of the contract with every person, company or corporation who or which is connected to or uses the Village sewer system, and every such person, company or corporation, by connecting with the sewer system, shall be considered as expressing his or its assent to be bound thereby. B. Application for service. Every person desiring to connect property, buildings or structures to public sewers shall make application in writing to the Public Works and Utilities Director, on such forms as are prescribed for that purpose, prior to commencing use of such service. The application must describe fully and truthfully all the wastes which are anticipated to be discharged. If the applicant is not the fee simple owner of the property, the written consent of the owner must accompany the application. Persons connected to the public sewers of the Village are referred to herein as "users." By submitting such an application, all users are deemed to have agreed to be bound by this Part 2, as amended from time to time. If it appears that the service applied for will not provide adequate service for the contemplated use, the Public Works and Utilities Director may reject the application. If the Public Works and Utilities Director approves the application, a building permit will be issued as shown on the application. No service shall be provided or application approved without prior payment of all applicable fees. C. Application fee. Where the application for service is for a connection to the public sewers, the application shall be accompanied by an application fee(s) in an amount to be determined from time to time by the Commission. Such fee shall cover the cost of processing the application and inspection of the connection. Application fees may vary in amount between residential users and commercial/ industrial users. The payment of this fee shall be in addition to any connection fees that may be charged to or on account of new users by the Commission or by MMSD. D. Inspections. Any connection to the public sewers within the Village shall be subject to the prior inspection and approval of the work by an authorized representative of the Commission. No trench or other excavation shall be filled, or any connection completed, without such prior inspection. The applicant requesting the connection shall reimburse the Commission for all inspection costs incurred, if not previously paid as part of the application fee. E. Disconnection and refusal of service. Sewer service may be disconnected or refused for any of the following reasons: (1) Violation of this Part 2, as amended from time to time. (2) Violation of the MMSD Ordinance, as amended from time to time. (3) Failure to pay the application fee, any connection fee or delinquent account of the user. F. Disconnection for delinquent accounts. A bill for service is delinquent if unpaid after the due date shown on the bill. The Commission may disconnect service for a delinquent bill by giving the user, at least eight calendar days prior to disconnection, a written disconnect notice which may be included in the bill for service.

Text truncated. Open the original for the full document.

Source: Village of Cottage Grove website. First collected Oct 25, 2026.