Packet
Village of Cottage Grove · Dane County · meeting of Oct 19, 2026 · Agenda packets
Open the original document More from Village of Cottage Grove
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
VILLAGE OF COTTAGE GROVE
NOTICE OF PUBLIC MEETING
Village Board of Trustees
Monday, October 19, 2026
6:30 p.m.
This meeting will take place as a hybrid meeting both virtually and in person at Village Hall at 221
E. Cottage Grove Road. If you are utilizing Zoom, please join the meeting from your computer,
tablet or smartphone by visiting https://us06web.zoom.us/j/81356337106?
pwd=VYhCrF56PJ4zvY7mZ9edmQ4qRzwbbL.1. You can also participate via phone by dialing 1
312 626 6799 and use Meeting ID 813 5633 7106#. When asked for your Participant ID, just press
#, when asked for the Passcode enter 221.You may also choose to participate by providing public
comment prior to the meeting via email to Village Clerk Lisa
Kalata: lkalata@villageofcottagegrove.gov . If this is a teleconference, virtual or hybrid meeting,
please review the Village of Cottage Grove’s policy.
Call To Order
Determination Of Quorum And That The Agenda Was Properly Posted.
Pledge Of Allegiance
PUBLIC APPEARANCES-Public's Opportunity To Speak
Discuss The Minutes Of The Village Board Meeting On October 5, 2026 And The Joint
Village Board And Town Meeting On October 6, 2026.
10-5-26 VB MINUTES.PDF
10-6-26 JT. VB - TOWN MINUTES.PDF
Consider The Minutes Of The Village Board Meeting On October 5, 2026 And The Joint
Village Board And Town Meeting On October 6, 2026.
Unfinished Business
Discuss Phase Agreement For Subdivision Improvements For Kosh Valley, LLC, Aka
Juniper Fields.
JUNIPER FIELDS PHASE 1 AGREEMENT (CLEAN).PDF
JUNIPER FIELDS PHASE 1 AGREEMENT.PDF
Consider Phase Agreement For Subdivision Improvements For Kosh Valley, LLC,
Aka Juniper Fields.
Discuss Appointments To Comprehensive Plan Focus Groups. (Presented By President
Kelm-Nelson)
FOCUS GROUP APPOINTMENTS COMP PLAN_CKN 10-19-26.PDF
Consider Appointments To Comprehensive Plan Focus Groups.
New Business
Discuss Special Event Permit Application From Cottage Grove Chamber.
LETTER TO THE VILLAGE.PDF
CG CHAMBER APPLICATION W-COMMENTS.PDF
2026 PARADE ROUTE.JPG
Consider Special Event Permit Application From Cottage Grove Chamber.
Discuss Ordinance 16-2026 Re: Amending Chapter 12, Ordinance 17-2026, Re:
Repealing And Recreating Chapter 163, Ordinance 18-2026 Re: Repealing And
Recreating Chapter 312.
16-2026 AMENDING CHAPTER 12 RELATED TO PUBLIC WORKS AND
PARKS AND RECREATION COMMITTEES.PDF
17-2026 REPEALING AND RECREATING CHAPTER 163 W-EXHIBIT A.PDF
EROSION SEDIMENT AND WATER RUNOFF CONTROL (REDLINE).PDF
18-2026 REPEALING AND RECREATING CHAPTER 312 W-EXHIBIT A.PDF
WATER SEWER AND STORMWATER (REDLINE) (002).PDF
Consider Ordinance 16-2026 Re: Amending Chapter 12, Ordinance 17-2026, Re:
Repealing And Recreating Chapter 163, Ordinance 18-2026 Re: Repealing And
Recreating Chapter 312.
Reports From Village Boards, Commissions & Committees
Plan Commission
10-14-2026 PLAN COMMISSION AGENDA.PDF
Discuss An Application From Kendal & Donna Uphoff For Approval Of A ETJ
Certified Survey Map To Create One New 2.11 Acre Parcel From Parcel #0711-142-
8070-2 On W. Ridge Road In The Town Of Cottage Grove.
CG_VAR_PC_UPHOFF-ETJ-CSM_2026-10-14.PDF
CG_UPHOFF-ETJ-CSM_2026-10-07.PDF
UPHOFF - RIDGE RD CSM (8-26-26).PDF
UPHOFF - RIDGE RD CSM(3-31-26).PDF
VILLAGE APP (SIGNED).PDF
Consider An Application From Kendal & Donna Uphoff For Approval Of A ETJ
Certified Survey Map To Create One New 2.11 Acre Parcel From Parcel #0711-
142-8070-2 On W. Ridge Road In The Town Of Cottage Grove.
Discuss An Application From Hydrite Chemical Co. For Approval Of A Site Plan
Amendment For The Construction Of A New 2,560 Sq. Ft. Building And Associated
Pipe Bridge At The Existing Facility Located At 114 N. Main Street.
CG_VAR_PC_HYDRITE-SITE_2026-10-14.PDF
CG_HYDRITESITEAMEND_2026-10-06.PDF
2026-09-10-260075000-SEALED CIVIL PLANS.PDF
HOT OIL BUILDING_STRAND REVIEW.PDF
PLAN REVIEW APPLICATION SIGNED.PDF
PROJECT NARRATIVE.PDF
ZONING MAP 11X17.PDF
260075000 - SHEET - A1-1A - FIRST FLOOR PLAN - AREA-A.PDF
260075000 - SHEET - A2-0 - EXTERIOR ELEVATIONS.PDF
Consider An Application From Hydrite Chemical Co. For Approval Of A Site Plan
Amendment For The Construction Of A New 2,560 Sq. Ft. Building And
Associated Pipe Bridge At The Existing Facility Located At 114 N. Main Street.
Discuss An Application From Johnson Health Tech For Approval Of A Site Plan
Amendment For The Expansion Of An Existing Parking Lot At The Former Madison
Window Cleaning Building Located At 205 Commerce Parkway.
CG_VAR_PC_JHT-SITE_2026-10-14-UPDATED.PDF
CG_JHTPARKING_2026-10-06.PDF
JOHNSON HEALTH TECH_STRAND REVIEW.PDF
205 COMMERCE FGCC 093026.PDF
261569_CIVIL PLANS_2026-09-28.PDF
Consider An Application From Johnson Health Tech For Approval Of A Site Plan
Amendment For The Expansion Of An Existing Parking Lot At The Former
Madison Window Cleaning Building Located At 205 Commerce Parkway.
Budget Review Committee
10-12-2026 BUDGET REVIEW COMMITTEE.PDF
Utility Commission
10-14-26 UTILITY AGENDA.PDF
Public Works, Properties And Sustainability Committee
9-16-26 PW AGENDA.PDF
Discuss An Agreement For Services With GRAEF Regarding The Active
Transportation Plan.
COTTAGE GROVE_TRAFFIC STUDY_DRAFT PROPOSAL_2026-10.PDF
2026-1012.00 - COTTAGE GROVE ATP DRAFT CONTRACT.PDF
Consider An Agreement For Services With GRAEF Regarding The Active
Transportation Plan.
Ad Hoc Architectural Review Committee
10-14-2026 ARC AGENDA.PDF
Deer-Grove EMS Commission
10-15-2026 DGEMS COMMISSION PACKET.PDF
Reports From Village Officers
Village Attorney
i. Legal briefings/status update.
Village Administrator
VILLAGE ADMINISTRATOR REPORT - 10.19.26.PDF
PROJECTS, INITIATIVES, AND DEVELOPMENT TRACKER 10.15.26.PDF
Communications And Miscellaneous Business
Consider Approval Of Vouchers
BILLS LIST.PDF
PAY APPLICATION 10.PDF
Correspondence
Upcoming Community Events
Future Agenda Items
Discuss And Consider Enter Into Closed Session Regarding Village Administrator
Performance Evaluation Process. The Village Of Cottage Grove Village Board Will Enter
Into Closed Session Pursuant To Wisconsin State Statute §19.85 (1)(C) Considering
Employment, Promotion, Compensation Or Performance Evaluation Data Of Any Public
Employee Over Which The Governmental Body Has Jurisdiction Or Exercises
Responsibility.
Reconvene Into Open Session And Possible Consideration Of Closed Session Items.
Adjournment
Any item on the agenda is subject to final action. Notice: Persons needing special
accommodations should call 608-839-4704 at least 24 hours prior to the meeting. It is
possible that members of and possibly a quorum of members of other governmental bodies
may attend the above stated meeting to gather information; no action will be taken by any
governmental body at the above -stated meeting other than the governmental body
specifically referred to above in this notice.
Upcoming meetings:
10/21- Library Board
10/22- Parks & Rec
10/26- VB Budget Workshop
10/28- Board of Review
10/29- Emergency Management
10/29- Joint Fire Commission
1.
2.
3.
4.
5.
Documents:
a.
6.
a.
Documents:
a.i.
b.
Documents:
b.i.
7.
a.
Documents:
a.i.
b.
Documents:
b.i.
8.
a.
Documents:
a.i.
Documents:
a.i.1.
a.ii.
Documents:
a.ii.1.
a.iii.
Documents:
a.iii.1.
b.
Documents:
c.
Documents:
d.
Documents:
d.i.
Documents:
d.i.1.
e.
Documents:
f.
Documents:
9.
a.
b.
Documents:
10.
a.
Documents:
b.
c.
d.
11.
12.
13.
VILLAGE OF COTTAGE GROVE
NOTICE OF PUBLIC MEETING
Village Board of Trustees
Monday, October 19, 2026
6:30 p.m.
This meeting will take place as a hybrid meeting both virtually and in person at Village Hall at 221
E. Cottage Grove Road. If you are utilizing Zoom, please join the meeting from your computer,
tablet or smartphone by visiting https://us06web.zoom.us/j/81356337106?
pwd=VYhCrF56PJ4zvY7mZ9edmQ4qRzwbbL.1. You can also participate via phone by dialing 1
312 626 6799 and use Meeting ID 813 5633 7106#. When asked for your Participant ID, just press
#, when asked for the Passcode enter 221.You may also choose to participate by providing public
comment prior to the meeting via email to Village Clerk Lisa
Kalata: lkalata@villageofcottagegrove.gov . If this is a teleconference, virtual or hybrid meeting,
please review the Village of Cottage Grove’s policy.
Call To Order
Determination Of Quorum And That The Agenda Was Properly Posted.
Pledge Of Allegiance
PUBLIC APPEARANCES-Public's Opportunity To Speak
Discuss The Minutes Of The Village Board Meeting On October 5, 2026 And The Joint
Village Board And Town Meeting On October 6, 2026.
10-5-26 VB MINUTES.PDF
10-6-26 JT. VB - TOWN MINUTES.PDF
Consider The Minutes Of The Village Board Meeting On October 5, 2026 And The Joint
Village Board And Town Meeting On October 6, 2026.
Unfinished Business
Discuss Phase Agreement For Subdivision Improvements For Kosh Valley, LLC, Aka
Juniper Fields.
JUNIPER FIELDS PHASE 1 AGREEMENT (CLEAN).PDF
JUNIPER FIELDS PHASE 1 AGREEMENT.PDF
Consider Phase Agreement For Subdivision Improvements For Kosh Valley, LLC,
Aka Juniper Fields.
Discuss Appointments To Comprehensive Plan Focus Groups. (Presented By President
Kelm-Nelson)
FOCUS GROUP APPOINTMENTS COMP PLAN_CKN 10-19-26.PDF
Consider Appointments To Comprehensive Plan Focus Groups.
New Business
Discuss Special Event Permit Application From Cottage Grove Chamber.
LETTER TO THE VILLAGE.PDF
CG CHAMBER APPLICATION W-COMMENTS.PDF
2026 PARADE ROUTE.JPG
Consider Special Event Permit Application From Cottage Grove Chamber.
Discuss Ordinance 16-2026 Re: Amending Chapter 12, Ordinance 17-2026, Re:
Repealing And Recreating Chapter 163, Ordinance 18-2026 Re: Repealing And
Recreating Chapter 312.
16-2026 AMENDING CHAPTER 12 RELATED TO PUBLIC WORKS AND
PARKS AND RECREATION COMMITTEES.PDF
17-2026 REPEALING AND RECREATING CHAPTER 163 W-EXHIBIT A.PDF
EROSION SEDIMENT AND WATER RUNOFF CONTROL (REDLINE).PDF
18-2026 REPEALING AND RECREATING CHAPTER 312 W-EXHIBIT A.PDF
WATER SEWER AND STORMWATER (REDLINE) (002).PDF
Consider Ordinance 16-2026 Re: Amending Chapter 12, Ordinance 17-2026, Re:
Repealing And Recreating Chapter 163, Ordinance 18-2026 Re: Repealing And
Recreating Chapter 312.
Reports From Village Boards, Commissions & Committees
Plan Commission
10-14-2026 PLAN COMMISSION AGENDA.PDF
Discuss An Application From Kendal & Donna Uphoff For Approval Of A ETJ
Certified Survey Map To Create One New 2.11 Acre Parcel From Parcel #0711-142-
8070-2 On W. Ridge Road In The Town Of Cottage Grove.
CG_VAR_PC_UPHOFF-ETJ-CSM_2026-10-14.PDF
CG_UPHOFF-ETJ-CSM_2026-10-07.PDF
UPHOFF - RIDGE RD CSM (8-26-26).PDF
UPHOFF - RIDGE RD CSM(3-31-26).PDF
VILLAGE APP (SIGNED).PDF
Consider An Application From Kendal & Donna Uphoff For Approval Of A ETJ
Certified Survey Map To Create One New 2.11 Acre Parcel From Parcel #0711-
142-8070-2 On W. Ridge Road In The Town Of Cottage Grove.
Discuss An Application From Hydrite Chemical Co. For Approval Of A Site Plan
Amendment For The Construction Of A New 2,560 Sq. Ft. Building And Associated
Pipe Bridge At The Existing Facility Located At 114 N. Main Street.
CG_VAR_PC_HYDRITE-SITE_2026-10-14.PDF
CG_HYDRITESITEAMEND_2026-10-06.PDF
2026-09-10-260075000-SEALED CIVIL PLANS.PDF
HOT OIL BUILDING_STRAND REVIEW.PDF
PLAN REVIEW APPLICATION SIGNED.PDF
PROJECT NARRATIVE.PDF
ZONING MAP 11X17.PDF
260075000 - SHEET - A1-1A - FIRST FLOOR PLAN - AREA-A.PDF
260075000 - SHEET - A2-0 - EXTERIOR ELEVATIONS.PDF
Consider An Application From Hydrite Chemical Co. For Approval Of A Site Plan
Amendment For The Construction Of A New 2,560 Sq. Ft. Building And
Associated Pipe Bridge At The Existing Facility Located At 114 N. Main Street.
Discuss An Application From Johnson Health Tech For Approval Of A Site Plan
Amendment For The Expansion Of An Existing Parking Lot At The Former Madison
Window Cleaning Building Located At 205 Commerce Parkway.
CG_VAR_PC_JHT-SITE_2026-10-14-UPDATED.PDF
CG_JHTPARKING_2026-10-06.PDF
JOHNSON HEALTH TECH_STRAND REVIEW.PDF
205 COMMERCE FGCC 093026.PDF
261569_CIVIL PLANS_2026-09-28.PDF
Consider An Application From Johnson Health Tech For Approval Of A Site Plan
Amendment For The Expansion Of An Existing Parking Lot At The Former
Madison Window Cleaning Building Located At 205 Commerce Parkway.
Budget Review Committee
10-12-2026 BUDGET REVIEW COMMITTEE.PDF
Utility Commission
10-14-26 UTILITY AGENDA.PDF
Public Works, Properties And Sustainability Committee
9-16-26 PW AGENDA.PDF
Discuss An Agreement For Services With GRAEF Regarding The Active
Transportation Plan.
COTTAGE GROVE_TRAFFIC STUDY_DRAFT PROPOSAL_2026-10.PDF
2026-1012.00 - COTTAGE GROVE ATP DRAFT CONTRACT.PDF
Consider An Agreement For Services With GRAEF Regarding The Active
Transportation Plan.
Ad Hoc Architectural Review Committee
10-14-2026 ARC AGENDA.PDF
Deer-Grove EMS Commission
10-15-2026 DGEMS COMMISSION PACKET.PDF
Reports From Village Officers
Village Attorney
i. Legal briefings/status update.
Village Administrator
VILLAGE ADMINISTRATOR REPORT - 10.19.26.PDF
PROJECTS, INITIATIVES, AND DEVELOPMENT TRACKER 10.15.26.PDF
Communications And Miscellaneous Business
Consider Approval Of Vouchers
BILLS LIST.PDF
PAY APPLICATION 10.PDF
Correspondence
Upcoming Community Events
Future Agenda Items
Discuss And Consider Enter Into Closed Session Regarding Village Administrator
Performance Evaluation Process. The Village Of Cottage Grove Village Board Will Enter
Into Closed Session Pursuant To Wisconsin State Statute §19.85 (1)(C) Considering
Employment, Promotion, Compensation Or Performance Evaluation Data Of Any Public
Employee Over Which The Governmental Body Has Jurisdiction Or Exercises
Responsibility.
Reconvene Into Open Session And Possible Consideration Of Closed Session Items.
Adjournment
Any item on the agenda is subject to final action. Notice: Persons needing special
accommodations should call 608-839-4704 at least 24 hours prior to the meeting. It is
possible that members of and possibly a quorum of members of other governmental bodies
may attend the above stated meeting to gather information; no action will be taken by any
governmental body at the above -stated meeting other than the governmental body
specifically referred to above in this notice.
Upcoming meetings:
10/21- Library Board
10/22- Parks & Rec
10/26- VB Budget Workshop
10/28- Board of Review
10/29- Emergency Management
10/29- Joint Fire Commission
1.
2.
3.
4.
5.
Documents:
a.
6.
a.
Documents:
a.i.
b.
Documents:
b.i.
7.
a.
Documents:
a.i.
b.
Documents:
b.i.
8.
a.
Documents:
a.i.
Documents:
a.i.1.
a.ii.
Documents:
a.ii.1.
a.iii.
Documents:
a.iii.1.
b.
Documents:
c.
Documents:
d.
Documents:
d.i.
Documents:
d.i.1.
e.
Documents:
f.
Documents:
9.
a.
b.
Documents:
10.
a.
Documents:
b.
c.
d.
11.
12.
13.
VILLAGE OF COTTAGE GROVE
NOTICE OF PUBLIC MEETING
Village Board of Trustees
Monday, October 19, 2026
6:30 p.m.
This meeting will take place as a hybrid meeting both virtually and in person at Village Hall at 221
E. Cottage Grove Road. If you are utilizing Zoom, please join the meeting from your computer,
tablet or smartphone by visiting https://us06web.zoom.us/j/81356337106?
pwd=VYhCrF56PJ4zvY7mZ9edmQ4qRzwbbL.1. You can also participate via phone by dialing 1
312 626 6799 and use Meeting ID 813 5633 7106#. When asked for your Participant ID, just press
#, when asked for the Passcode enter 221.You may also choose to participate by providing public
comment prior to the meeting via email to Village Clerk Lisa
Kalata: lkalata@villageofcottagegrove.gov . If this is a teleconference, virtual or hybrid meeting,
please review the Village of Cottage Grove’s policy.
Call To Order
Determination Of Quorum And That The Agenda Was Properly Posted.
Pledge Of Allegiance
PUBLIC APPEARANCES-Public's Opportunity To Speak
Discuss The Minutes Of The Village Board Meeting On October 5, 2026 And The Joint
Village Board And Town Meeting On October 6, 2026.
10-5-26 VB MINUTES.PDF
10-6-26 JT. VB - TOWN MINUTES.PDF
Consider The Minutes Of The Village Board Meeting On October 5, 2026 And The Joint
Village Board And Town Meeting On October 6, 2026.
Unfinished Business
Discuss Phase Agreement For Subdivision Improvements For Kosh Valley, LLC, Aka
Juniper Fields.
JUNIPER FIELDS PHASE 1 AGREEMENT (CLEAN).PDF
JUNIPER FIELDS PHASE 1 AGREEMENT.PDF
Consider Phase Agreement For Subdivision Improvements For Kosh Valley, LLC,
Aka Juniper Fields.
Discuss Appointments To Comprehensive Plan Focus Groups. (Presented By President
Kelm-Nelson)
FOCUS GROUP APPOINTMENTS COMP PLAN_CKN 10-19-26.PDF
Consider Appointments To Comprehensive Plan Focus Groups.
New Business
Discuss Special Event Permit Application From Cottage Grove Chamber.
LETTER TO THE VILLAGE.PDF
CG CHAMBER APPLICATION W-COMMENTS.PDF
2026 PARADE ROUTE.JPG
Consider Special Event Permit Application From Cottage Grove Chamber.
Discuss Ordinance 16-2026 Re: Amending Chapter 12, Ordinance 17-2026, Re:
Repealing And Recreating Chapter 163, Ordinance 18-2026 Re: Repealing And
Recreating Chapter 312.
16-2026 AMENDING CHAPTER 12 RELATED TO PUBLIC WORKS AND
PARKS AND RECREATION COMMITTEES.PDF
17-2026 REPEALING AND RECREATING CHAPTER 163 W-EXHIBIT A.PDF
EROSION SEDIMENT AND WATER RUNOFF CONTROL (REDLINE).PDF
18-2026 REPEALING AND RECREATING CHAPTER 312 W-EXHIBIT A.PDF
WATER SEWER AND STORMWATER (REDLINE) (002).PDF
Consider Ordinance 16-2026 Re: Amending Chapter 12, Ordinance 17-2026, Re:
Repealing And Recreating Chapter 163, Ordinance 18-2026 Re: Repealing And
Recreating Chapter 312.
Reports From Village Boards, Commissions & Committees
Plan Commission
10-14-2026 PLAN COMMISSION AGENDA.PDF
Discuss An Application From Kendal & Donna Uphoff For Approval Of A ETJ
Certified Survey Map To Create One New 2.11 Acre Parcel From Parcel #0711-142-
8070-2 On W. Ridge Road In The Town Of Cottage Grove.
CG_VAR_PC_UPHOFF-ETJ-CSM_2026-10-14.PDF
CG_UPHOFF-ETJ-CSM_2026-10-07.PDF
UPHOFF - RIDGE RD CSM (8-26-26).PDF
UPHOFF - RIDGE RD CSM(3-31-26).PDF
VILLAGE APP (SIGNED).PDF
Consider An Application From Kendal & Donna Uphoff For Approval Of A ETJ
Certified Survey Map To Create One New 2.11 Acre Parcel From Parcel #0711-
142-8070-2 On W. Ridge Road In The Town Of Cottage Grove.
Discuss An Application From Hydrite Chemical Co. For Approval Of A Site Plan
Amendment For The Construction Of A New 2,560 Sq. Ft. Building And Associated
Pipe Bridge At The Existing Facility Located At 114 N. Main Street.
CG_VAR_PC_HYDRITE-SITE_2026-10-14.PDF
CG_HYDRITESITEAMEND_2026-10-06.PDF
2026-09-10-260075000-SEALED CIVIL PLANS.PDF
HOT OIL BUILDING_STRAND REVIEW.PDF
PLAN REVIEW APPLICATION SIGNED.PDF
PROJECT NARRATIVE.PDF
ZONING MAP 11X17.PDF
260075000 - SHEET - A1-1A - FIRST FLOOR PLAN - AREA-A.PDF
260075000 - SHEET - A2-0 - EXTERIOR ELEVATIONS.PDF
Consider An Application From Hydrite Chemical Co. For Approval Of A Site Plan
Amendment For The Construction Of A New 2,560 Sq. Ft. Building And
Associated Pipe Bridge At The Existing Facility Located At 114 N. Main Street.
Discuss An Application From Johnson Health Tech For Approval Of A Site Plan
Amendment For The Expansion Of An Existing Parking Lot At The Former Madison
Window Cleaning Building Located At 205 Commerce Parkway.
CG_VAR_PC_JHT-SITE_2026-10-14-UPDATED.PDF
CG_JHTPARKING_2026-10-06.PDF
JOHNSON HEALTH TECH_STRAND REVIEW.PDF
205 COMMERCE FGCC 093026.PDF
261569_CIVIL PLANS_2026-09-28.PDF
Consider An Application From Johnson Health Tech For Approval Of A Site Plan
Amendment For The Expansion Of An Existing Parking Lot At The Former
Madison Window Cleaning Building Located At 205 Commerce Parkway.
Budget Review Committee
10-12-2026 BUDGET REVIEW COMMITTEE.PDF
Utility Commission
10-14-26 UTILITY AGENDA.PDF
Public Works, Properties And Sustainability Committee
9-16-26 PW AGENDA.PDF
Discuss An Agreement For Services With GRAEF Regarding The Active
Transportation Plan.
COTTAGE GROVE_TRAFFIC STUDY_DRAFT PROPOSAL_2026-10.PDF
2026-1012.00 - COTTAGE GROVE ATP DRAFT CONTRACT.PDF
Consider An Agreement For Services With GRAEF Regarding The Active
Transportation Plan.
Ad Hoc Architectural Review Committee
10-14-2026 ARC AGENDA.PDF
Deer-Grove EMS Commission
10-15-2026 DGEMS COMMISSION PACKET.PDF
Reports From Village Officers
Village Attorney
i. Legal briefings/status update.
Village Administrator
VILLAGE ADMINISTRATOR REPORT - 10.19.26.PDF
PROJECTS, INITIATIVES, AND DEVELOPMENT TRACKER 10.15.26.PDF
Communications And Miscellaneous Business
Consider Approval Of Vouchers
BILLS LIST.PDF
PAY APPLICATION 10.PDF
Correspondence
Upcoming Community Events
Future Agenda Items
Discuss And Consider Enter Into Closed Session Regarding Village Administrator
Performance Evaluation Process. The Village Of Cottage Grove Village Board Will Enter
Into Closed Session Pursuant To Wisconsin State Statute §19.85 (1)(C) Considering
Employment, Promotion, Compensation Or Performance Evaluation Data Of Any Public
Employee Over Which The Governmental Body Has Jurisdiction Or Exercises
Responsibility.
Reconvene Into Open Session And Possible Consideration Of Closed Session Items.
Adjournment
Any item on the agenda is subject to final action. Notice: Persons needing special
accommodations should call 608-839-4704 at least 24 hours prior to the meeting. It is
possible that members of and possibly a quorum of members of other governmental bodies
may attend the above stated meeting to gather information; no action will be taken by any
governmental body at the above -stated meeting other than the governmental body
specifically referred to above in this notice.
Upcoming meetings:
10/21- Library Board
10/22- Parks & Rec
10/26- VB Budget Workshop
10/28- Board of Review
10/29- Emergency Management
10/29- Joint Fire Commission
1.
2.
3.
4.
5.
Documents:
a.
6.
a.
Documents:
a.i.
b.
Documents:
b.i.
7.
a.
Documents:
a.i.
b.
Documents:
b.i.
8.
a.
Documents:
a.i.
Documents:
a.i.1.
a.ii.
Documents:
a.ii.1.
a.iii.
Documents:
a.iii.1.
b.
Documents:
c.
Documents:
d.
Documents:
d.i.
Documents:
d.i.1.
e.
Documents:
f.
Documents:
9.
a.
b.
Documents:
10.
a.
Documents:
b.
c.
d.
11.
12.
13.
VILLAGE OF COTTAGE GROVE
NOTICE OF PUBLIC MEETING
Village Board of Trustees
Monday, October 19, 2026
6:30 p.m.
This meeting will take place as a hybrid meeting both virtually and in person at Village Hall at 221
E. Cottage Grove Road. If you are utilizing Zoom, please join the meeting from your computer,
tablet or smartphone by visiting https://us06web.zoom.us/j/81356337106?
pwd=VYhCrF56PJ4zvY7mZ9edmQ4qRzwbbL.1. You can also participate via phone by dialing 1
312 626 6799 and use Meeting ID 813 5633 7106#. When asked for your Participant ID, just press
#, when asked for the Passcode enter 221.You may also choose to participate by providing public
comment prior to the meeting via email to Village Clerk Lisa
Kalata: lkalata@villageofcottagegrove.gov . If this is a teleconference, virtual or hybrid meeting,
please review the Village of Cottage Grove’s policy.
Call To Order
Determination Of Quorum And That The Agenda Was Properly Posted.
Pledge Of Allegiance
PUBLIC APPEARANCES-Public's Opportunity To Speak
Discuss The Minutes Of The Village Board Meeting On October 5, 2026 And The Joint
Village Board And Town Meeting On October 6, 2026.
10-5-26 VB MINUTES.PDF
10-6-26 JT. VB - TOWN MINUTES.PDF
Consider The Minutes Of The Village Board Meeting On October 5, 2026 And The Joint
Village Board And Town Meeting On October 6, 2026.
Unfinished Business
Discuss Phase Agreement For Subdivision Improvements For Kosh Valley, LLC, Aka
Juniper Fields.
JUNIPER FIELDS PHASE 1 AGREEMENT (CLEAN).PDF
JUNIPER FIELDS PHASE 1 AGREEMENT.PDF
Consider Phase Agreement For Subdivision Improvements For Kosh Valley, LLC,
Aka Juniper Fields.
Discuss Appointments To Comprehensive Plan Focus Groups. (Presented By President
Kelm-Nelson)
FOCUS GROUP APPOINTMENTS COMP PLAN_CKN 10-19-26.PDF
Consider Appointments To Comprehensive Plan Focus Groups.
New Business
Discuss Special Event Permit Application From Cottage Grove Chamber.
LETTER TO THE VILLAGE.PDF
CG CHAMBER APPLICATION W-COMMENTS.PDF
2026 PARADE ROUTE.JPG
Consider Special Event Permit Application From Cottage Grove Chamber.
Discuss Ordinance 16-2026 Re: Amending Chapter 12, Ordinance 17-2026, Re:
Repealing And Recreating Chapter 163, Ordinance 18-2026 Re: Repealing And
Recreating Chapter 312.
16-2026 AMENDING CHAPTER 12 RELATED TO PUBLIC WORKS AND
PARKS AND RECREATION COMMITTEES.PDF
17-2026 REPEALING AND RECREATING CHAPTER 163 W-EXHIBIT A.PDF
EROSION SEDIMENT AND WATER RUNOFF CONTROL (REDLINE).PDF
18-2026 REPEALING AND RECREATING CHAPTER 312 W-EXHIBIT A.PDF
WATER SEWER AND STORMWATER (REDLINE) (002).PDF
Consider Ordinance 16-2026 Re: Amending Chapter 12, Ordinance 17-2026, Re:
Repealing And Recreating Chapter 163, Ordinance 18-2026 Re: Repealing And
Recreating Chapter 312.
Reports From Village Boards, Commissions & Committees
Plan Commission
10-14-2026 PLAN COMMISSION AGENDA.PDF
Discuss An Application From Kendal & Donna Uphoff For Approval Of A ETJ
Certified Survey Map To Create One New 2.11 Acre Parcel From Parcel #0711-142-
8070-2 On W. Ridge Road In The Town Of Cottage Grove.
CG_VAR_PC_UPHOFF-ETJ-CSM_2026-10-14.PDF
CG_UPHOFF-ETJ-CSM_2026-10-07.PDF
UPHOFF - RIDGE RD CSM (8-26-26).PDF
UPHOFF - RIDGE RD CSM(3-31-26).PDF
VILLAGE APP (SIGNED).PDF
Consider An Application From Kendal & Donna Uphoff For Approval Of A ETJ
Certified Survey Map To Create One New 2.11 Acre Parcel From Parcel #0711-
142-8070-2 On W. Ridge Road In The Town Of Cottage Grove.
Discuss An Application From Hydrite Chemical Co. For Approval Of A Site Plan
Amendment For The Construction Of A New 2,560 Sq. Ft. Building And Associated
Pipe Bridge At The Existing Facility Located At 114 N. Main Street.
CG_VAR_PC_HYDRITE-SITE_2026-10-14.PDF
CG_HYDRITESITEAMEND_2026-10-06.PDF
2026-09-10-260075000-SEALED CIVIL PLANS.PDF
HOT OIL BUILDING_STRAND REVIEW.PDF
PLAN REVIEW APPLICATION SIGNED.PDF
PROJECT NARRATIVE.PDF
ZONING MAP 11X17.PDF
260075000 - SHEET - A1-1A - FIRST FLOOR PLAN - AREA-A.PDF
260075000 - SHEET - A2-0 - EXTERIOR ELEVATIONS.PDF
Consider An Application From Hydrite Chemical Co. For Approval Of A Site Plan
Amendment For The Construction Of A New 2,560 Sq. Ft. Building And
Associated Pipe Bridge At The Existing Facility Located At 114 N. Main Street.
Discuss An Application From Johnson Health Tech For Approval Of A Site Plan
Amendment For The Expansion Of An Existing Parking Lot At The Former Madison
Window Cleaning Building Located At 205 Commerce Parkway.
CG_VAR_PC_JHT-SITE_2026-10-14-UPDATED.PDF
CG_JHTPARKING_2026-10-06.PDF
JOHNSON HEALTH TECH_STRAND REVIEW.PDF
205 COMMERCE FGCC 093026.PDF
261569_CIVIL PLANS_2026-09-28.PDF
Consider An Application From Johnson Health Tech For Approval Of A Site Plan
Amendment For The Expansion Of An Existing Parking Lot At The Former
Madison Window Cleaning Building Located At 205 Commerce Parkway.
Budget Review Committee
10-12-2026 BUDGET REVIEW COMMITTEE.PDF
Utility Commission
10-14-26 UTILITY AGENDA.PDF
Public Works, Properties And Sustainability Committee
9-16-26 PW AGENDA.PDF
Discuss An Agreement For Services With GRAEF Regarding The Active
Transportation Plan.
COTTAGE GROVE_TRAFFIC STUDY_DRAFT PROPOSAL_2026-10.PDF
2026-1012.00 - COTTAGE GROVE ATP DRAFT CONTRACT.PDF
Consider An Agreement For Services With GRAEF Regarding The Active
Transportation Plan.
Ad Hoc Architectural Review Committee
10-14-2026 ARC AGENDA.PDF
Deer-Grove EMS Commission
10-15-2026 DGEMS COMMISSION PACKET.PDF
Reports From Village Officers
Village Attorney
i. Legal briefings/status update.
Village Administrator
VILLAGE ADMINISTRATOR REPORT - 10.19.26.PDF
PROJECTS, INITIATIVES, AND DEVELOPMENT TRACKER 10.15.26.PDF
Communications And Miscellaneous Business
Consider Approval Of Vouchers
BILLS LIST.PDF
PAY APPLICATION 10.PDF
Correspondence
Upcoming Community Events
Future Agenda Items
Discuss And Consider Enter Into Closed Session Regarding Village Administrator
Performance Evaluation Process. The Village Of Cottage Grove Village Board Will Enter
Into Closed Session Pursuant To Wisconsin State Statute §19.85 (1)(C) Considering
Employment, Promotion, Compensation Or Performance Evaluation Data Of Any Public
Employee Over Which The Governmental Body Has Jurisdiction Or Exercises
Responsibility.
Reconvene Into Open Session And Possible Consideration Of Closed Session Items.
Adjournment
Any item on the agenda is subject to final action. Notice: Persons needing special
accommodations should call 608-839-4704 at least 24 hours prior to the meeting. It is
possible that members of and possibly a quorum of members of other governmental bodies
may attend the above stated meeting to gather information; no action will be taken by any
governmental body at the above -stated meeting other than the governmental body
specifically referred to above in this notice.
Upcoming meetings:
10/21- Library Board
10/22- Parks & Rec
10/26- VB Budget Workshop
10/28- Board of Review
10/29- Emergency Management
10/29- Joint Fire Commission
1.
2.
3.
4.
5.
Documents:
a.
6.
a.
Documents:
a.i.
b.
Documents:
b.i.
7.
a.
Documents:
a.i.
b.
Documents:
b.i.
8.
a.
Documents:
a.i.
Documents:
a.i.1.
a.ii.
Documents:
a.ii.1.
a.iii.
Documents:
a.iii.1.
b.
Documents:
c.
Documents:
d.
Documents:
d.i.
Documents:
d.i.1.
e.
Documents:
f.
Documents:
9.
a.
b.
Documents:
10.
a.
Documents:
b.
c.
d.
11.
12.
13.
VILLAGE OF COTTAGE GROVE
NOTICE OF PUBLIC MEETING
Village Board of Trustees
Monday, October 19, 2026
6:30 p.m.
This meeting will take place as a hybrid meeting both virtually and in person at Village Hall at 221
E. Cottage Grove Road. If you are utilizing Zoom, please join the meeting from your computer,
tablet or smartphone by visiting https://us06web.zoom.us/j/81356337106?
pwd=VYhCrF56PJ4zvY7mZ9edmQ4qRzwbbL.1. You can also participate via phone by dialing 1
312 626 6799 and use Meeting ID 813 5633 7106#. When asked for your Participant ID, just press
#, when asked for the Passcode enter 221.You may also choose to participate by providing public
comment prior to the meeting via email to Village Clerk Lisa
Kalata: lkalata@villageofcottagegrove.gov . If this is a teleconference, virtual or hybrid meeting,
please review the Village of Cottage Grove’s policy.
Call To Order
Determination Of Quorum And That The Agenda Was Properly Posted.
Pledge Of Allegiance
PUBLIC APPEARANCES-Public's Opportunity To Speak
Discuss The Minutes Of The Village Board Meeting On October 5, 2026 And The Joint
Village Board And Town Meeting On October 6, 2026.
10-5-26 VB MINUTES.PDF
10-6-26 JT. VB - TOWN MINUTES.PDF
Consider The Minutes Of The Village Board Meeting On October 5, 2026 And The Joint
Village Board And Town Meeting On October 6, 2026.
Unfinished Business
Discuss Phase Agreement For Subdivision Improvements For Kosh Valley, LLC, Aka
Juniper Fields.
JUNIPER FIELDS PHASE 1 AGREEMENT (CLEAN).PDF
JUNIPER FIELDS PHASE 1 AGREEMENT.PDF
Consider Phase Agreement For Subdivision Improvements For Kosh Valley, LLC,
Aka Juniper Fields.
Discuss Appointments To Comprehensive Plan Focus Groups. (Presented By President
Kelm-Nelson)
FOCUS GROUP APPOINTMENTS COMP PLAN_CKN 10-19-26.PDF
Consider Appointments To Comprehensive Plan Focus Groups.
New Business
Discuss Special Event Permit Application From Cottage Grove Chamber.
LETTER TO THE VILLAGE.PDF
CG CHAMBER APPLICATION W-COMMENTS.PDF
2026 PARADE ROUTE.JPG
Consider Special Event Permit Application From Cottage Grove Chamber.
Discuss Ordinance 16-2026 Re: Amending Chapter 12, Ordinance 17-2026, Re:
Repealing And Recreating Chapter 163, Ordinance 18-2026 Re: Repealing And
Recreating Chapter 312.
16-2026 AMENDING CHAPTER 12 RELATED TO PUBLIC WORKS AND
PARKS AND RECREATION COMMITTEES.PDF
17-2026 REPEALING AND RECREATING CHAPTER 163 W-EXHIBIT A.PDF
EROSION SEDIMENT AND WATER RUNOFF CONTROL (REDLINE).PDF
18-2026 REPEALING AND RECREATING CHAPTER 312 W-EXHIBIT A.PDF
WATER SEWER AND STORMWATER (REDLINE) (002).PDF
Consider Ordinance 16-2026 Re: Amending Chapter 12, Ordinance 17-2026, Re:
Repealing And Recreating Chapter 163, Ordinance 18-2026 Re: Repealing And
Recreating Chapter 312.
Reports From Village Boards, Commissions & Committees
Plan Commission
10-14-2026 PLAN COMMISSION AGENDA.PDF
Discuss An Application From Kendal & Donna Uphoff For Approval Of A ETJ
Certified Survey Map To Create One New 2.11 Acre Parcel From Parcel #0711-142-
8070-2 On W. Ridge Road In The Town Of Cottage Grove.
CG_VAR_PC_UPHOFF-ETJ-CSM_2026-10-14.PDF
CG_UPHOFF-ETJ-CSM_2026-10-07.PDF
UPHOFF - RIDGE RD CSM (8-26-26).PDF
UPHOFF - RIDGE RD CSM(3-31-26).PDF
VILLAGE APP (SIGNED).PDF
Consider An Application From Kendal & Donna Uphoff For Approval Of A ETJ
Certified Survey Map To Create One New 2.11 Acre Parcel From Parcel #0711-
142-8070-2 On W. Ridge Road In The Town Of Cottage Grove.
Discuss An Application From Hydrite Chemical Co. For Approval Of A Site Plan
Amendment For The Construction Of A New 2,560 Sq. Ft. Building And Associated
Pipe Bridge At The Existing Facility Located At 114 N. Main Street.
CG_VAR_PC_HYDRITE-SITE_2026-10-14.PDF
CG_HYDRITESITEAMEND_2026-10-06.PDF
2026-09-10-260075000-SEALED CIVIL PLANS.PDF
HOT OIL BUILDING_STRAND REVIEW.PDF
PLAN REVIEW APPLICATION SIGNED.PDF
PROJECT NARRATIVE.PDF
ZONING MAP 11X17.PDF
260075000 - SHEET - A1-1A - FIRST FLOOR PLAN - AREA-A.PDF
260075000 - SHEET - A2-0 - EXTERIOR ELEVATIONS.PDF
Consider An Application From Hydrite Chemical Co. For Approval Of A Site Plan
Amendment For The Construction Of A New 2,560 Sq. Ft. Building And
Associated Pipe Bridge At The Existing Facility Located At 114 N. Main Street.
Discuss An Application From Johnson Health Tech For Approval Of A Site Plan
Amendment For The Expansion Of An Existing Parking Lot At The Former Madison
Window Cleaning Building Located At 205 Commerce Parkway.
CG_VAR_PC_JHT-SITE_2026-10-14-UPDATED.PDF
CG_JHTPARKING_2026-10-06.PDF
JOHNSON HEALTH TECH_STRAND REVIEW.PDF
205 COMMERCE FGCC 093026.PDF
261569_CIVIL PLANS_2026-09-28.PDF
Consider An Application From Johnson Health Tech For Approval Of A Site Plan
Amendment For The Expansion Of An Existing Parking Lot At The Former
Madison Window Cleaning Building Located At 205 Commerce Parkway.
Budget Review Committee
10-12-2026 BUDGET REVIEW COMMITTEE.PDF
Utility Commission
10-14-26 UTILITY AGENDA.PDF
Public Works, Properties And Sustainability Committee
9-16-26 PW AGENDA.PDF
Discuss An Agreement For Services With GRAEF Regarding The Active
Transportation Plan.
COTTAGE GROVE_TRAFFIC STUDY_DRAFT PROPOSAL_2026-10.PDF
2026-1012.00 - COTTAGE GROVE ATP DRAFT CONTRACT.PDF
Consider An Agreement For Services With GRAEF Regarding The Active
Transportation Plan.
Ad Hoc Architectural Review Committee
10-14-2026 ARC AGENDA.PDF
Deer-Grove EMS Commission
10-15-2026 DGEMS COMMISSION PACKET.PDF
Reports From Village Officers
Village Attorney
i. Legal briefings/status update.
Village Administrator
VILLAGE ADMINISTRATOR REPORT - 10.19.26.PDF
PROJECTS, INITIATIVES, AND DEVELOPMENT TRACKER 10.15.26.PDF
Communications And Miscellaneous Business
Consider Approval Of Vouchers
BILLS LIST.PDF
PAY APPLICATION 10.PDF
Correspondence
Upcoming Community Events
Future Agenda Items
Discuss And Consider Enter Into Closed Session Regarding Village Administrator
Performance Evaluation Process. The Village Of Cottage Grove Village Board Will Enter
Into Closed Session Pursuant To Wisconsin State Statute §19.85 (1)(C) Considering
Employment, Promotion, Compensation Or Performance Evaluation Data Of Any Public
Employee Over Which The Governmental Body Has Jurisdiction Or Exercises
Responsibility.
Reconvene Into Open Session And Possible Consideration Of Closed Session Items.
Adjournment
Any item on the agenda is subject to final action. Notice: Persons needing special
accommodations should call 608-839-4704 at least 24 hours prior to the meeting. It is
possible that members of and possibly a quorum of members of other governmental bodies
may attend the above stated meeting to gather information; no action will be taken by any
governmental body at the above -stated meeting other than the governmental body
specifically referred to above in this notice.
Upcoming meetings:
10/21- Library Board
10/22- Parks & Rec
10/26- VB Budget Workshop
10/28- Board of Review
10/29- Emergency Management
10/29- Joint Fire Commission
1.
2.
3.
4.
5.
Documents:
a.
6.
a.
Documents:
a.i.
b.
Documents:
b.i.
7.
a.
Documents:
a.i.
b.
Documents:
b.i.
8.
a.
Documents:
a.i.
Documents:
a.i.1.
a.ii.
Documents:
a.ii.1.
a.iii.
Documents:
a.iii.1.
b.
Documents:
c.
Documents:
d.
Documents:
d.i.
Documents:
d.i.1.
e.
Documents:
f.
Documents:
9.
a.
b.
Documents:
10.
a.
Documents:
b.
c.
d.
11.
12.
13.
VILLAGE OF COTTAGE GROVE
VILLAGE BOARD OF TRUSTEES
Monday, October 5, 2026
MINUTES
1. Call to Order
President Kelm-Nelson called the Village Board of Trustees to order at 6:30 pm. This was a hybrid meeting.
2. Determination of quorum and that the agenda was properly posted.
It was determined that there was a quorum of members present, and that the agenda was properly posted. The
Village Board members present were Cindi Kelm-Nelson, Heidi Murphy, Chris Stoa (attended virtually), Paula
Severson, JP Villavicencio, Casey Erlandson and Dr. Rene Buenzow. Staff present were Administrator Matt Giese,
Administrator/Finance Director Cameron Sawyer, Assistant Administrator/HR Manager Inga Cushman, Planning &
Development Director Erin Ruth, Director of Parks and Recreation Sean Brusegar, Police Chief, Mark Garry, Clerk
Lisa Kalata, EMS Director Eric Lang (attended virtually), and Village Attorney Rick Manthe
3. Pledge of Allegiance.
4. PUBLIC APPEARANCES – Public’s opportunity to speak- None
5. Discuss the minutes of the Village Board meeting on September 21, 2026.
6. Consider the minutes of the Village Board meeting on September 21, 2026.
Motion by Murphy to approve September 21, 2026, meeting minutes, seconded by Erlandson. Motion carried with a
voice vote of 7-0-0.
7. New Business
a. Annual review of Village consultants and service providers.
i. Johnson Block-Larry Rasmussen was present to give a brief overview of services.
b. Discuss Proclamation RE: Pedestrian Safety Month. (Presented by Village President Kelm-Nelson and
Trustee Murphy)
b.i. Consider Proclamation RE: Pedestrian Safety Month.
Motion by Erlandson to approve the proclamation, seconded by Villavicencio. Motion carried with a voice vote of
7-0-0.
c. Discuss Resolution 2026-19 Re: October as Fire Prevention Month. (Presented by Trustee Murphy and
President Kelm-Nelson)
c.i. Consider Resolution 2026-19 Re: October as Fire Prevention Month.
Motion by Villavicencio to approve resolution 2026-19 as presented, seconded by Erlandson. Motion carried with
a voice vote of 7-0-0.
d. Discuss potential property acquisitions in TID 9. The Village Board may vote to enter closed session
under item 11 to be held at the end of the meeting.
d.i. Consider potential property acquisitions in TID 9. The Village Board may vote to enter closed session
under item 11 to be held at the end of the meeting.
No action taken.
e. Discuss attendance policy for intergovernmental meetings. (Presented by Trustee Stoa and President
Kelm-Nelson)
e.i. Consider attendance policy for intergovernmental meetings.
Motion by Villavicencio to direct staff to include in the village board handbook along with drafting an ordinance
change for all committees regarding unexcused absences, seconded by Erlandson. Motion carried with a voice
vote of 5-0-2 with Buenzow and Severson voting No.87. New Business
8. Reports from Village Boards, Commissions & Committees
a. Law Enforcement Committee
Stoa reported there was an update on the new police station. They discussed ALPRS. They approved the 2027
budget with a few changes. The monthly Chief’s reports were reviewed.
a.i. Discuss the Upfitting of Squad 255 for Command/Emergency Management.
a.i.1. Consider the Upfitting of Squad 255 for Command/Emergency Management.
Motion by Erlandson to approve the upfitting of Squad 255 for Command/Emergency Management as presented,
seconded by Murphy. Motion carried with a voice vote of 6-01 with Buenzow voting No.
b. Library Board
Villavicencio reported they approved an update to the donation policy. They approved the 2027 budget. Programming was
discussed and is going well with more attendees in 2026. The next meeting is October 21st.
c. Parks, Recreation & Forestry Committee
Murphy reported there was a concept plan for Juniper Fields parkland and the committee gave feedback. They discussed
the 2027 budget, and the Director’s report was given. They discussed the permanent park sign at Out lot 5 at Thaden
Natural Area.
c.i. Discuss a permanent park sign at Out lot 5 (Thaden Natural Area).
c.i.1. Consider a permanent park sign at Out lot 5 (Thaden Natural Area).
No action taken.
d. Natvig Landfill Monitoring Review Committee
Villavicencio reported they approved the bills and the testing and monitoring results were discussed. They approved the
2027 service contract with Strand.
e. Flynn Hall Committee
Kelm-Nelson reported they reviewed the usage for 2026, and they have received no complaints. They approved the 2027
budget with a $100 increase from last year.
f. Board of Review
Kelm-Nelson reported they held the 2-hour required meeting and reviewed the roll and performed all the statutory
requirements. They considered 4 waivers requests and approved one. They conducted one objection hearing. The next
meeting will be on October 28th at 5 pm.
g. Cottage Grove Fire District Commission
Murphy reported the Chief’s report was reviewed. They discussed the 2027 budgets and ESB maintenance. The snow
removal and lawn care was discussed and there are other areas of the ESB maintenance that will be discussed at the
Joint Village/Town meeting this week.
h. Joint Review Board
Kelm-Nelson reported they appointed officers, Ehlers gave the annual report, and they approved the resolutions as
required.
9. Reports From Village Officers
a. Village Attorney
i. Legal briefings/status update.
ii. Update on Road to Housing Act.
Attorney Manthe gave an overview of the federal housing bill.
b. Village Administrator
Giese reported that Trista Taylor was a presenter at the National Parks and Recreation conference.
Kelm-Nelson reported she received an email recognizing Giese’s 20 years of service.
c. Assistant Administrator/Finance Director
i. Discuss 2026 Budget Amendment 2026-005.
i.a. Consider 2026 Budget Amendment 2026-005.
Motion by Murphy to approve the 2026 Budget Amendment 2026-005, seconded by Erlandson. Motion
carried with a voice vote of 7-0-0.
10. Communications and Miscellaneous Business
a. Consider approval of vouchers.
Motion by Erlandson to approve the vouchers, seconded by Murphy. Motion carried with a voice vote of 5-0-2
with Buenzow and Severson voting No.
a.i. Consider approval of vouchers.
Motion by Murphy to approve the vouchers, seconded by Erlandson. Motion carried with a voice vote of 6-1-0
with Buenzow voting No.
b. Correspondence- Sawyer reported there were four attendees for the budget listening sessions and one online
form.
c. Upcoming community events- PTO annual fall fest on Saturday, October 10th. Walk and Roll bike to school day
on October 8th. Fire Department Open House at the Fire Station. Stormwater Utility PIM on October 13th from 5-7 pm.
Library Badger Talks on October 19th and 28th at Drumlin Reserve.
d. Future agenda items- List of focus groups for the Comp Plan. Associated Appraisal service provider review.
11. Discuss and consider entering into closed session to discuss and consider potential acquisition of TID#9
property as discussed in item 6.d. The Village of Cottage Grove Village Board will enter Closed Session pursuant
to Wisconsin State Statute §19.85 (1)(e) Deliberating or negotiating the purchasing of public properties, the
investing of public funds, or conducting other specified public business, whenever competitive or bargaining
reasons require a closed session.
Motion by Kelm-Nelson to enter closed session at 7:47 pm to Discuss and consider entering into closed session to
discuss and consider potential acquisition of TID#9 property as discussed in item 6.d. The Village of Cottage Grove
Village Board will enter Closed Session pursuant to Wisconsin State Statute §19.85 (1)(e) Deliberating or negotiating the
purchasing of public properties, the investing of public funds, or conducting other specified public business, whenever
competitive or bargaining reasons require a closed session, seconded by Murphy. Motion carried with a roll call vote of
Buenzow Aye, Erlandson Aye, Kelm-Nelson Aye, Murphy Aye, Severson Aye, Stoa Aye, Villavicencio Aye.
12. Discuss and consider enter into closed session regarding Village Administrator Performance evaluation
process. The Village of Cottage Grove Village Board will enter into Closed Session pursuant to Wisconsin State
Statute §19.85 (1)(c) considering employment, promotion, compensation or performance evaluation data of any
public employee over which the governmental body has jurisdiction or exercises responsibility.
Motion by Kelm-Nelson to enter closed session at 7:48 pm to discuss Village Administrator Performance evaluation
process. The Village of Cottage Grove Village Board will enter into Closed Session pursuant to Wisconsin State Statute
§19.85 (1)(c) considering employment, promotion, compensation or performance evaluation data of any public employee
over which the governmental body has jurisdiction or exercises responsibility, seconded by Erlandson. Motion carried
with a roll call vote of Buenzow Aye, Erlandson Aye, Kelm-Nelson Aye, Murphy Aye, Severson Aye, Stoa Aye,
Villavicencio Aye.
13. Reconvene into open session and possible consideration of closed session items.
Motion by Murphy to reconvene into open session at 8:32 p.m., seconded by Erlandson. Motion carried with a roll call
vote Buenzow Aye, Erlandson Aye, Kelm-Nelson Aye, Murphy Aye, Severson Aye, Stoa Aye, Villavicencio Aye.
Motion by Erlandson to give the Village Administrator a 3% merit increase along with a 6% bonus, seconded by
Villavicencio. Motion carried with a voice vote of 6-0-1 with Buenzow voting No.
14.Adjournment
Motion by Murphy to adjourn at 8:34 p.m., seconded by Erlandson. Motion carried with a voice vote of 7-0-0.
Lisa Kalata, Clerk
Village of Cottage Grove
Approved:
These minutes represent the general subject discussed in this meeting but do not reflect a verbatim documentation of the
subjects and conversations that took place.
VILLAGE OF COTTAGE GROVE & TOWN OF COTTAGE GROVE
VILLAGE BOARD OF TRUSTEES & TOWN BOARD OF SUPERVISORS
Tuesday, October 6, 2026
MINUTES
1. Call to Order
a. Cottage Grove Town Board of Supervisors- Chairperson Anders called the Town Board of Supervisors meeting
to order at 5:30 pm
b. Cottage Grove Village Board of Trustees- President Kelm-Nelson called the Village Board of Trustees to order at
5:30 pm. This was a hybrid meeting.
2. Determination of quorum and that the agenda was properly posted.
It was determined that there was a quorum of members present, and that the agenda was properly posted. The
Village Board members present were Cindi Kelm-Nelson, Chris Stoa (attended virtually), Heidi Murphy, Paula
Severson, Casey Erlandson, and JP Villavicencio. Dr. Rene Buenzow was absent and excused. Town Board
members present were Steve Anders, Mike Fonger, Kristi Williams, Troy Eickhoff and Patrick Buchholz. Staff present
were Village Administrator Matt Giese, Assistant Administrator/Finance Director Cameron Sawyer, Police Chief Mark
Garry, Clerk Lisa Kalata, Planning Director Erin Ruth, EMS Director Eric Lang, Fire Chief Nick Archibald and Village
Attorney Rick Manthe.
3. Pledge of Allegiance.
4. PUBLIC APPEARANCES – Public’s opportunity to speak- none
5. Unfinished Business
a. Discuss joint ESB lease agreements.
The Village and Town attorneys are working on the agreement. This will be on the next joint meeting agenda on
November 4, 2026.
b. Discuss and consider proposal to investigate an emergency connection at Meadowlark St. (Presented by
Trustee Severson).
Motion by Erlandson to direct staff to move forward with quotes and options for connection between Meadowlark St.
and Wellington Plc., seconded by Murphy. Motion carried with a voice vote of 6-0-0.
c. Discuss and consider joint Village and Town meeting at 5PM on November 4, 2026 at Village Hall.
Motion by Williams to hold the joint Village and Town meeting on November 4, 2026 @ 5 pm at Village Hall,
seconded by Anders. Motion carried with a voice vote of 5-0-0.
Motion by Murphy to have the joint Village and Town meeting on November 4, 2026 @ 5 pm at Village Hall,
seconded by Erlandson. Motion carried with a voice vote of 5-0-1 with Severson voting No.
d. Discuss and consider ESB maintenance items.
The direction was to add $5,000 by each municipality for the 2027 budget for ESB maintenance items.
6. Adjournment-Town
Motion by Williams to adjourn at 6:10 pm, seconded by Eickhoff. Motion carried with a voice vote of 5-0-0.
Adjournment-Village
Motion by Erlandson to adjourn at 6:10 p.m., seconded by Murphy. Motion carried with a voice vote of 6-0-0.
Lisa Kalata, Clerk
Village of Cottage Grove
Approved:
These minutes represent the general subject discussed in this meeting but do not reflect a verbatim documentation of the
subjects and conversations that took place.
PHASE AGREEMENT FOR
SUBDIVISION IMPROVEMENTS
PHASE 1
THIS AGREEMENT FOR SUBDIVISION PUBLIC IMPROVEMENTS AND
RELEASE OF LOTS FOR DEVELOPMENT (this “Phase Agreement”) is entered into this 31st
day of July, 2026, by and between Kosh Valley, LLC, a Wisconsin limited liability company, (the
“Developer”), and the Village of Cottage Grove (“Village”), a Wisconsin municipal corporation.
RECITALS
A. The Developer has received approval by the Village of Cottage Grove for a Plat known
as Juniper Fields (hereinafter the “Plat”) for an area of land located in the Village of
Cottage Grove.
B. Developer intends to develop the Plat in phases (each a “Phase” and collectively the
“Phases”).
C. Village of Cottage Grove ordinances require that provisions be made for the installation
of Public Improvements, including but not limited to, streets, street lighting, sanitary
sewers and water mains and appurtenances thereto, storm sewer and stormwater drainage
facilities, greenways, walk ways, and erosion controls, and that such improvements be
constructed by the Developer without cost to the Village.
D. The Developer is bound by an agreement dated July 20, 2026, entitled “Agreement to
Undertake Development (Juniper Fields),” (“Development Agreement”) relating to the
installation of Public Improvements needed to serve the Plat, among other things.
E. The Village’s purposes in entering into this Phase Agreement are to provide for the
installation of Public Improvements to serve lots 1-47 of the Plat (“Phase 1”), to require
the Developer to pay the direct and indirect costs related to the required Public
Improvements, and to avoid the harmful effects of substandard subdivisions.
F. The Developer now wishes to proceed with the installation of Public Improvements
needed to serve Phase 1.
AGREEMENT
NOW, THEREFORE, for good and valuable consideration, the receipt and sufficiency of
which is hereby acknowledged, the Developer and the Village agree as follows:
1. Agreement to Undertake Development. The Developer continues to be bound by the
Development Agreement. Except as expressly provided otherwise in this Phase
Agreement, the Development Agreement shall govern the development of Phase 1 and
remains in full force and effect.
2. Public Improvements. The Developer shall construct and install those Public
Improvements needed to serve Phase 1, as determined by the Village Engineer and Village
Director of Public Works . The Public I mprovements contemplated herein include the
following: interceptor sewer and sanitary sewer service mains, manholes, laterals and all
appurtenances; water mains, laterals, hydrants, valves and all appurtenances; storm sewer
mains; streets, curb and gutter and sidewalks; street lamps; street signs; and facilities for
the provision of natural gas, electric, cable, and telephone utility service (hereinafter
referred to as the “ Public Improvements”), in accordance with Plans and Specifications
approved by the Village Engineer.
The Public Improvements will be designed, constructed and installed by the Developer in
accordance with the current standard specifications of the Village of Cottage Grove except
as variances to or waivers of those requirements have been properly granted, and in
accordance with Plans and Specifications approved by the Village Engineer. Developer
shall provide two copies of the approved, signed and stamped Plans and Specifications to
the Village Engineer, and one copy shall be provided to each contractor. Only stamped
and signed copies of the Plans and Specifications shall be used on the job site. Where
standards and/or specifications have not been established by the Village, all work shall be
made in accordance with established engineering practices as designated and approved by
the Village Engineer.
3. Village Approval of Starting Dates. No land disturbances or work shall begin without the
Village Engineer’s approval of a starting date and schedule which shall be submitted by
the Developer to the Village Engineer at a preconstruction meeting between Developer and
the Village. A starting date will not be approved until the Financial Security Instrument
required by the Development Agreement has been provided to the Village.
a. The parties acknowledge that Developer will need to manage stormwater for Phase
1 with temporary off -site stormwater management facilities. No start date for
construction of Public Improvements will be approved, and Developer shall not
commence construction of Phase 1 Public Improvements until the parties have
entered into a mutually acceptable stormwater management agreement for the
temporary stormwater management facilities needed to service Phase 1. The
stormwater management agreement shall, at a minimum, require Developer to
maintain the temporary stormwater management facilities at its sole cost and
expense and allow the Village to enter onto those privately owned and maintained
facilities to perform maintenance and repairs if Developer fails to do so, and charge
the Developer for the costs of maintenance and repairs.
4. Release of Lots. Subject to all requirements of this Phase Agreement and the Development
Agreement, Developer is hereby permitted to design, construct, and install all Public
Improvements necessary to serve lots 1 through 47.
5. Developer’s Project Manager . The Developer hereby designates Steve Decleene as the
Project Manager, who shall act as the Developer’s representative during the construction
of the Public Improvements. The Project Manager shall be available during construction
hours on the job site or available by telephone at 262.894.3759.
6. Change to Work Order . The Village shall not be responsible for any costs or changes
relating to this Project except those specifically enumerated and agreed upon in this or
subsequent written, signed agreements between the Developer and the Village.
7. Time of Completion . All work specified herein in Phase 1, shall be completed within
twelve months after the approved start date. No damages may be recovered by Developer
or any person against the Village for delay in completion of the Public Improvements.
8. Definitions. Any capitalized terms in this Phase Agreement that are not defined shall have
the same meaning as the Development Agreement.
9. Effective Date. This Phase Agreement is entered into as of the day and year first written
above.
[Signature pages follow.]
IN WITNESS WHEREOF, the parties have hereunto set their hands and seals as of the
dates noted below.
VILLAGE OF COTTAGE GROVE
By:
Cynthia Kelm-Nelson, Village President
ATTEST:
Lisa Kalata, Village Clerk
DEVELOPER
By: _______________________________
Print name: ______________________
Title: ___________________________
PHASE AGREEMENT FOR
SUBDIVISION IMPROVEMENTS
PHASE 1
THIS AGREEMENT FOR SUBDIVISION PUBLIC IMPROVEMENTS AND
RELEASE OF LOTS FOR DEVELOPMENT (this “Phase Agreement”) is entered into this 31st
day of July, 2026, by and between Kosh Valley, LLC, a Wisconsin limited liability company, (the
“Developer”), and the Village of Cottage Grove (“Village”), a Wisconsin municipal corporation.
RECITALS
A. The Developer has received approval by the Village of Cottage Grove for a Plat known
as Juniper Fields (hereinafter the “Plat”) for an area of land located in the Village of
Cottage Grove.
B. Developer intends to develop the Plat in phases (each a “Phase” and collectively the
“Phases”).
C. Village of Cottage Grove ordinances require that provisions be made for the installation
of Public Improvements, including but not limited to, streets, street lighting, sanitary
sewers and water mains and appurtenances thereto, storm sewer and stormwater drainage
facilities, greenways, walk ways, and erosion controls, and that such improvements be
constructed by the Developer without cost to the Village.
D. The Developer is bound by an agreement dated July 20, 2026, entitled “Agreement to
Undertake Development (Juniper Fields),” (“Development Agreement”) relating to the
installation of Public Improvements needed to serve the Plat, among other things.
E. The Village’s purposes in entering into this Phase Agreement are to provide for the
installation of Public Improvements to serve lots 1-47 of the Plat (“Phase 1”), to require
the Developer to pay the direct and indirect costs related to the required Public
Improvements, and to avoid the harmful effects of substandard subdivisions.
F. The Developer now wishes to proceed with the installation of Public Improvements
needed to serve Phase 1.
AGREEMENT
NOW, THEREFORE, for good and valuable consideration, the receipt and sufficiency of
which is hereby acknowledged, the Developer and the Village agree as follows:
1. Agreement to Undertake Development. The Developer continues to be bound by the
Development Agreement. Except as expressly provided otherwise in this Phase
Agreement, the Development Agreement sha ll govern the development of Phase 1 and
remains in full force and effect.
2. Public Improvements. The Developer shall construct and install those Public
Improvements needed to serve Phase 1, as determined by the Village Engineer and Village
Director of Public Works. The Public Im provements contemplated herein include the
following: interceptor sewer and sanitary sewer service mains, manholes, laterals and all
appurtenances; water mains, laterals, hydrants, valves and all appurtenances; storm sewer
mains; streets, curb and gutter and sidewalks; street lamps; st reet signs; and facilities for
the provision of natural gas, electric, cable, and telephone utility service (hereinafter
referred to as the “Public Improvements”), in accordance with Plans and Specifications
approved by the Village Engineer.
The Public Improvements will be designed, constructed and installed by the Developer in
accordance with the current standard specifications of the Village of Cottage Grove except
as variances to or waivers of those requir ements have been properly granted, and in
accordance with Plans and Specifications a pproved by the Village Engineer. Developer
shall provide two copies of the approved, si gned and stamped Plans and Specifications to
the Village Engineer, and one copy shall be provided to each contractor. Only stamped
and signed copies of the Plans and Specifications shall be used on the job site. Where
standards and/or specifications have not been established by the Village, all work shall be
made in accordance with established engineering practices as designated and approved by
the Village Engineer.
3. Village Approval of Starting Dates. No land disturbances or work shall begin without the
Village Engineer’s approval of a starting date and schedule which shall be submitted by
the Developer to the Village Engineer at a preconstruction meeting between Developer and
the Village. A starting date will not be ap proved until the Financial Security Instrument
required by the Development Agreement has been provided to the Village.
3.a. The parties acknowledge that Developer will need to manage stormwater for Phase
1 with temporary off-site stormwater mana gement facilities. No start date for
construction of Public Improvements will be approved, and Developer shall not
commence construction of Phase 1 Public Improvements until the parties have
entered into a mutually acceptable stormwater management agreement for the
temporary stormwater management facilities needed to service Phase 1. The
stormwater management agreement shall, at a minimum, require Developer to
maintain the temporary stormwater management facilities at its sole cost and
expense and allow the Village to enter onto those privately owned and maintained
Formatted: Indent: Left: 0.5", No bullets or numbering
Formatted: Indent: Left: 0.5"
facilities to perform maintenance and repairs if Developer fails to do so, and charge
the Developer for the costs of maintenance and repairs.
4. Release of Lots. Subject to all requirements of this Phase Agreement and the Development
Agreement, Developer is hereby permitted to design, construct, and install all Public
Improvements necessary to serve lots 1 through 47.
5. Developer’s Project Manager. The Developer hereby designates Steve Decleene as the
Project Manager, who shall act as the Devel oper’s representative during the construction
of the Public Improvements. The Project Ma nager shall be available during construction
hours on the job site or available by telephone at 262.894.3759.
6. Change to Work Order . The Village shall not be res ponsible for any co sts or changes
relating to this Project except those specific ally enumerated and agreed upon in this or
subsequent written, signed agreements between the Developer and the Village.
7. Time of Completion . All work specified herein in Phase 1, shall be completed within
twelve months after the approved start date. No damages may be recovered by Developer
or any person against the Village for delay in completion of the Public Improvements.
8. Definitions. Any capitalized terms in this Phase Agreement that are not defined shall have
the same meaning as the Development Agreement.
9. Effective Date. This Phase Agreement is entered into as of the day and year first written
above.
[Signature pages follow.]
IN WITNESS WHEREOF, the parties have here unto set their hands and seals as of the
dates noted below.
VILLAGE OF COTTAGE GROVE
B y :
Cynthia Kelm-Nelson, Village President
ATTEST:
Lisa Kalata, Village Clerk
DEVELOPER
By: _______________________________
Print name: ______________________
Title: ___________________________
Trustee Memo
Village of Cottage Grove, WI 1
Meeting Date: 10-19-26
Memo Date: 10-15-26
To: Village Board
From: Cindi Kelm-Nelson, Village President
Subject: Comprehensive Plan Update Focus Group Appointments
Background/Overview
I have organized the following four focus groups to support community input and research for the
Village’s Comprehensive Plan update. These groups are consistent with the direction of the Plan
Commission and the Village Board’s prior approval.
The following focus groups are scheduled for November 5, 2026, and will be appropriately noticed:
1. Business Leaders, 11:00 a.m., via Zoom
2. Seniors and Students, 5:00 p.m., Municipal Services Building (MSB)
3. Residents, 6:00 p.m., MSB
4. New and Longtime Residents, 7:00 p.m., MSB
The Village Board is respectfully requested to approve the proposed participants for each focus group.
Please consider approving the broad category of MGSD students, as proposed by the district, as well
as seniors designated by Drumlin Reserve.
Additional appointments may be forthcoming as I continue to receive RSVPs. If the Board is amenable,
I will bring those forward for consideration at the November 2, 2026, Village Board meeting.
I appreciate the time, willingness, and commitment of these community members to contribute their
perspectives and help shape the Village’s future!
1
(Business Leaders)
2
(Seniors & Students)
3
(Residents)
4
(New and Longtime
Residents)
1 Mike Swanson, Atlantis Valley Foods MGSD student list Melissa Reithmeyer Eileen and Dave Conklin
2 Andrew Homburg, Homburg
Development
Drumlin Reserve list
Kate Martin Charles Pelleymounter
3 Dawn Auby, Johnson Health Tech Jim Schnitzler
Michael John Holl
Mike Hackel
4 Jason Vangalis, Amazon
April Harding, Drumlin
Reserve/Capri
Pastor Nate Abrahamson
5 Britt Leach, CG Chamber ED
Steve DeCleene,
Neumann Development
Charlie Rodgers
6 Mike Day, Piggly Wiggly Abby McDowell
7 Brooke Goudreau, Kids Safari
8
October 2, 2026
Re: Cottage Grove Chamber Christmas in the Grove Parade
To: Cottage Grove Village Board:
I am writing today to request a partnership with the Village for our annual Christmas in the
Grove Parade. We have been hosting this community favorite for many years and would
like to continue to do so with your support.
In reading the Special Events Manual, we feel that we meet the criteria to partner with the
Village for this fun, free community event. Because we meet the criteria, we are humbly
asking if you will waive the cost of the Special Events Permit fee for our event on Friday
December 4th on Main Street at 6:30 P .M.
If you have any follow up questions, please feel free to contact Britt Leach
CgChamber@CottageGroveChamber.com
Thank you for your consideration!
Britt Leach
Executive Director
Cottage Grove Chamber of Commerce
221 E. Cottage Grove Road
Cottage Grove, WI 53527
608-839-4704
www.vi.cottagegrove.wi.gov
SPECIAL EVENT PERMIT APPLICATION
Permit approved Date
Permit fees paid Date
Deposit paid Date
Deposit returned? Date
FEES ARE NON-REFUNDABLE
APPLICATION AND PERMIT FEE IS DUE 60 DAYS PRIOR TO YOUR EVENT.
ORGANIZATION INFORMATION
Name of Organization
Street Address City State Zip
Phone Number Are you an IRS approved not for
profit organization?Circleone Yes No
Event Contact Person(First & Last Name)
Address City State Zip
Email Phone Number Day of Event Phone Number
EVENT INFORMATION
Name of Event Date(s) of Event
Event Start Time Event End Time
Location of the Event*
Will your event take place near a residential neighborhood?If yes, you will be required
to notify all adjacent property owners when the event will occur.Circle One
Yes No
You MUST attach a detailed map/sketch of your event indicating the specific location, layout of your
event, the direction of the route, including all turns and the number of traffic lanes to be used.
*If you are using a Village Park, you must reserve the park through thePark/Recreation Department
prior to getting your special event permit approved by the Village Board. Call (608) 839-8968.
Generally describe your event and its purpose
Based on the class definitions found in the manual, what
class is your event? Circle One. Class I Class II
Estimated Number of Participants Spectators Vendors
OTHER INFORMATION
Is there an outdoor bar that will serve alcohol? If yes, liquor and bartender licenses are
necessary under separate application. Circle One. Yes No
Please list the number of Village of Cottage Grove licensed bartenders that will be on site:
Will you be selling/serving food? If yes, you will need to contact the Dane County
Health Department for proper permits. Circle One. Yes No
If yes, will the food be distributed by a Food Truck already
permitted by the Village staff? Yes No
Will you be selling merchandise? If yes, you will need to obtain a Peddler's Permit
under separate application. Circle One. Yes No
Will your event need electricity? If yes, the Fire Department and Building Inspection
Department will need to inspect prior to being energized. Circle One. Yes No
Will you be setting up any lighting? If yes, the Fire Department and Building Inspection
Department will need to inspect prior to being energized. Circle One. Yes No
Will your event require any fencing? If yes, please provide plans for the fencing location
and the gates. Circle One. Yes No
Does the event involve fireworks? If yes, you will need to obtain a fireworks permit
under separate application through the Cottage Grove Fire Department. Circle One. Yes No
Does the event involve amplified music? Circle One. Yes No
If yes, will the amplified music be a (Circle one) : Band DJ Other
Hours of amplified music:
Please list the number of security staff you will be providing for the event:
Will you need barricades provided by the Village for your event, if so, how many?
Will you be erecting any tents, canopies or other temporary structure(s)? If yes, You will
need to provide a plan for their proposed locations and the Fire Department and
Building
Inspection Department will need to inspect these structures prior to the start of
your event. Circle One.
Yes
No
Will you be providing portable restrooms and wash stations? Circle One. Yes No
If yes, how many will you provide and where will they be located? Also how will solid waste
be disposed of? Provide name and contact info for companies providing these services.
Will you provide parking for participants? Parking plan with map must be included with
application. Circle One.
Yes No
If yes, where will parking be available?
Will you provide a dumpster/clean-up services? Circle One. Yes No
If yes, please describe your clean-up and refuse collection plan and provide the name and contact info for
the company providing the service.
OTHER INFORMATION CONTINUED
What other assistance do you foresee needing from theVillage (personnel, materials, and/or equipment)?
Have you reviewed and do you have a copy of theVillage of Cottage Grove Special
Events Manual as well as the Village Special Events Ordinance? Circle One. Yes No
INSURANCE REQUIREMENTS
The Special Event Sponsor must obtain liability insurance for an event that includes alcohol, has more than 150 peopleper
day, or involves a road closure. Proof of this insurance with coverage no less than $1,000,000 which names and endorses
the Village, its officers, agents, employees and contractors as an additional insured party is due no later than 20
days before the event.
Are you able to provide these insurance documents, if required?Circle One. Yes No
DEPOSIT REQUIREMENTS
The applicant may be required to submit to the Village a cleaning/damage deposit of $200 per day for each scheduled
day of the event (or portion thereof), two weeks prior to the starting date of the event. The deposit shall be refunded to
applicant, if, upon inspection, all is in order, or a prorated portion thereof as may be necessary to reimburse the Village
for loss or cleaning costs. The Village reserves the right to retain the entire deposit if cleanup is not completed
satisfactorily in the time frame as specified in the permit. Unless otherwise stated in the permit, the applicant shall befully
responsible for all necessary cleanup associated with the permitted event to be completed within twelve (12) hours after
the conclusion of the event. (This deposit is separate from any deposit required by the Park/Recreation Department for
park use).
TERMINATION OF AN EVENT
The Village reserves the right to shut down a special event that is in progress if it is deemed to be a public safety hazard
by Police Department, Fire Department, EMS and/or there is a violation of Village Ordinances, State Statutes or the
terms of the Applicant's permit. The Village Administrator and/or his/her designee may revoke an approved Special
Events Permit if the applicant fails to comply in good faith with the provisions of the permit prior to the event date.
By signing this form, the applicant certifies authorization to act on behalf of their organization and hereby
agrees to hold the Village, its officers, employees, agents and contractors, harmless against all claims, liability,
loss, damage or expense (including but not limited to actual attorney's fees) incurred by the Village for any
damage or injury to person or property caused by or resulting directly or indirectly from the activities for which
the permit is granted. Any change to coverage requires Village approval.
Signature of Applicant Date
For staff use only
Fees collected with application submission:
Class I Event
Class II Event
PERMIT FEES CHARGED
Application forwarded to:
Deputy Administrator
Building Inspector
Fire Chief
Addt’lfees charged by Departments:
Administration
Building Inspection
Fire
Parks & Rec Director Parks & Recreation
Village Board approval, if necessary, on:
Police Chief
Public Works Director
Police
Public Works
Police Department approval*:
EMS
Fire Department Approval*:
EMS
EMS Approval*:
*Comments/concerns should be attached separately
$150.00
SPECIAL EVENT APPLICATION
CONTACT INFORMATION & FEES SHEET
221 E. Cottage Grove Road
CottageGrove, WI 53527
608-839-4704
www.vi.cottagegrove.wi.gov
DEPARTMENT CONTACTS:
Clerk 608-839-4704 Police 608-839-4652
Building Inspection 608-697-7779 Parks & Recreation 608-839-8968
Fire 608-839-4343 Public Works & Utilities 608-839-5813
Deer-Grove EMS 608-839-5658
VILLAGE PERMIT AND OTHER FEES:
Barricades Up to 6 barricades - $35; over 6 barricades - $70
Class Ie v e n t $300 per day
Class II event $150 per day
Electrical Inspection If a temporary electrical service is needed a permit is
required from GEC.
EMS service (ambulance on site) Set by Deer-Grove EMS
Fireworks Permit No charge; State and local permit required
Garbage cans (55 gallon) $10.00 per garbage can
Host Permit $20.00 per year
Park Rental Permit Shelter Rental Required, see Park and Rec fee schedule
Pre-event Safety Inspection $75.00 per hour
Security Deposit $200.00 per day; May encounter an additional deposit if
utilizing a park facility.
Temporary Bartender License $30.00
Temporary Class B (Picnic) Beer & Wine
Licenses $10.00 (Picnic License for Alcoholic Beverages)
Tent Inspection $31.65 if under 2500 sq. ft.; per tent, per inspection. Each
tent requires separate application.
TransientMerchant Permit $20.00 application fee.
Christmas in the Grove
Comments for departments:
Parks & Recreation
No comments
EMS:
No concerns from the EMS perspective
Public Works:
Public Works has no specific comments regarding the event. We will coordinate with PD on locations of
No Parking signs, as needed, and barricades, cones, ect. for the event.
Police Department:
PD has been meeting with Chamber for this event.
No issues from PD side of things.
Fire Department:
No issues on the fire side.
ORDINANCE 16-2026
REPEALING AND RECREATING CHAPTER 163
OF THE VILLAGE OF COTTAGE GROVE
CODE OF ORDINANCES
The Village Board of the Village of Cottage Grove, Dane County, Wisconsin, does hereby
ordain as follows:
Recitals
A. The Village of Cottage Grove operates a parks, recreation, and forestry
committee, a public works committee, and a law enforcement committee.
B. The Village desires to clarify the roles and responsibilities of the parks,
recreation, and forestry committee, the public works committee, and the law
enforcement committee.
Ordinance
Section 1. Amend section 12-2.A. of the Village of Cottage Grove Code of Ordinances
to read as follows:
A. The Committee shall be comprised of one Village Board member and four
citizen members. The Director of Parks, and Recreation, and Forestry and the
Village Forester shall be the staff liaisons for this Committee. The Committee
may include up to two additional members who are current students in Grade
9, 10, 11, or 12 in a public or private high school, or the equivalent grade level
in a home-based educational program.
Section 2. Amend Section 12-2.C. of the Village of Cottage Grove Code of Ordinances
to read as follows:
C. Duties and responsibilities. The Committee shall have the following duties and
responsibilities, which are not all inclusive and shall be advisory except as
otherwise provided:
(1) Parks.
(a) To create and develop both a short- and long-term plan and budget for
the creation, development, and acceptance of parkland or purchase of
parkland, and/or the development of recreational trails. Said plan should
be reviewed on an annual basis to ensure th at it continues to meet the
needs of the community.
(b) To develop criteria by which the Committee, the Public Works,
Properties, and Sustainability Committee and the Village Board can
determine if parkland, recreational trails or passive parkland is
acceptable. These criteria shall be in a written form which s hall be
provided to each developer, citizen or interested individual for his or her
use in proposing the development of, acceptance of or purchase of
parkland or recreational trails. Reserved.
(c) To maintain an inventory of the parks, their usage and to determine if the
needs of the neighborhood within which the park or recreational trail is
located are being met.
(d) To create and develop a plan with an associated budget for maintaining
the existing park areas and recreational trails within the Village.
(e) To create and develop a capital improvement plan/budget for upgrading,
replacing and adding to existing park/recreational facilities, equipment
and/or recreational trails within the Village.
(f) To research and apply for and seek alternate funding sources such as
grants, donations and bequests.
(g) To identify projects which will require fund -raising activities, and upon
identification, the Village Board shall create an Ad Hoc Fund -Raising
Committee. One member of the Committee shall serve on this
Committee, along with four citizen members as appointed by the Village
President and approved by the Village Board.
(2) Forestry.
(a) To serve in an advisory capacity to the Village Board relating to trees
and shrubs located within street rights -of-way, parks, cemeteries, and
other public places in the Village, and to trees and shrubs located on
private property that constitute a hazard, threat or nuisance as described
herein.
(b) To prepare and maintain an inventory of trees located on public lands
within the Village.
(c) To prepare and recommend to the Village Board a plan for the planting,
care and maintenance of trees in the Village, including the number,
species and location.
(d) To identify, improve and promote desirable plant species.
(e) To apply for county, state, federal and private grant moneys for the
preparation and implementation of the Village's trees and natural area
program upon approval by the Village Board.
(f) To recommend such persons or firms who are qualified in urban forestry
to assist in the development of urban forestry and natural area
management for the Village.
(g) To provide a forum for and encourage public comments on Village tree
and natural area plans and programs.
(h) To annually conduct Arbor Day observance and ceremonies.
(i) Inform and educate Village citizens about the care of natural areas in
their neighborhoods.
(j) To maintain "Tree City USA" status.
(3) Recreation.
(a) To work with the Recreation Director to provide recreational (educational
and leisure) activities, both physical and/or cultural in nature, to the
Village and Town residents; to annually review that these recreational,
educational and leisure activities meet the needs for all income and age
groups of the community.
(b) To work with other communities, organizations or service agencies to
provide the most cost -effective method of developing and maintaining
recreational programs or activities.
(c) To develop a working relationship with other educational facilities,
schools and colleges to provide programs for the community.
(d) To work with the Public Works, Properties, and Sustainability Committee
to develop and maintain areas for recreational programs.
Section 3. Amend section 12-4.C. of the Village of Cottage Grove Code of Ordinances
to read as follows:
C. Duties and responsibilities:
(1) The Committee shall be advisory to the Village Board.
(2) Oversee the general operations and management of the Department.
(3) When the Committee expressly determines it to be prudent or necessary,
prescribe, review and/or approve rules and regulations for the control and
management of the sworn and nonsworn personnel of the Department.
(4) Contract and purchase all necessary apparatus and supplies for the use of
the Department expressly delegated to the Chief through a motion,
resolution or procurement policy specifically adopted by the Committee.
(5) Audit all bills, claims and expenses of the Department except where
expressly delegated to the Chief through a motion, resolution or
procurement policy specifically adopted by the Committee. Reserved.
(6) Provide recommendations regarding general policies, plans and long-range
goals for the Police Department.
(7) None of the functions and powers in this section shall be construed to
include powers for a Board of Police Commissioners in Wisconsin Statutes
§§ 62.13(3), (4)(a), (5), (7) including but not limited to hiring, firing,
disciplining or promotion of personnel, nor shall the Committee conduct any
hearing or other quasi-judicial proceeding.
Section 4. Amend section 12-8 of the Village of Cottage Grove code of ordinances to
read as follows:
§ 12-8. Utility Commission.
See Chapter 312., Water and Sewers, § 312-3.
Section 5. Amend section 12-10 of the Village of Cottage Grove Code of Ordinances
to read as follows:
A. Composition. The Committee shall consist of seven members, and include at
least one Trustee and four citizens. The Village Director of Public Works and
the Parks, Recreation, and Forestry Director shall be an ex officio nonvoting
members of the Committee.
B. Appointments.
(1) The Trustee shall be appointed by the Village President, subject to
confirmation by the Village Board. The Trustee shall serve for a one -year
term commencing May 1 of each year or until his or her successor is
appointed and confirmed by the Village Board. (The Trustee shall be
designated by the Village President to serve as Chairperson of the
Committee.)
(2) Citizen members. The citizen members of the Committee shall be appointed
by the Village President, subject to confirmation by the Village Board. The
terms of the citizen members shall be two -year terms. The appointments
shall commence on May 1 of the year of appointment, and the members
shall serve until their successors are appointed and confirmed by the Village
Board.
C. Powers and duties. The Public Works, Properties, and Sustainability
Committee is created for the purpose of reviewing and making
recommendations to the Village Board on all public works, public facilities,
multi-use trail, parkland, park facilities, recreational trail and related facilities.
(1) Public works:
(a) Responsible for the five -year capital projects plan for infrastructure
located within the Village.
(b) Construction and maintenance of streets, alleys, sidewalks, gutters,
multi-use trails, storm sewers, stormwater drainage , and other similar
public projects.
(c) Review and recommend to the Village Plan Commission updates,
additions and deletions to the Comprehensive Plan - Transportation
Plan.
(d) Review and recommend to the Village Board all budgetary, revenue and
expenditure proposals relating to public works projects.
(e) Maintenance of public facilities and properties owned by the Village.
(f) Recycling and garbage collection.
(g) Collection of leaves and brush and compost drop off area.
(h) Maintenance of public facilities owned by the Village. Reserved.
(i) To promote and protect the public health, safety and welfare by
monitoring and developing a program for management and
maintenance of environmental corridors to include greenways,
detention basins, wetlands, plant communities in public-owned natural
areas or dedicated property areas within Village boundaries. Reserved.
(j) Any other duties or responsibilities as directed by the Village Board.
This Ordinance shall become effective upon publication and notice of this Ordinance
required by Wisconsin statutes.
BY ORDER OF THE VILLAGE BOARD VILLAGE OF COTTAGE GROVE
_________________________________
Cynthia Kelm-Nelson, Village President
ATTEST: _________________________________
Lisa Kalata, Village Clerk
ORDINANCE 17-2026
REPEALING AND RECREATING CHAPTER 163 OF THE VILLAGE OF
COTTAGE GROVE CODE OF ORDINANCES
The Village Board of the Village of Cottage Grove, Dane County, Wisconsin, does hereby ordain
as follows:
Recitals
A. The Village of Cottage Grove regulates erosion, sediment, and stormwater runoff in
Chapter 163 of the Village of Cottage Grove Code of Ordinances.
B. The Village desires to amend chapter 163 to update provisions related to updates in
best management practices and Wisconsin and Dane County requirements.
Ordinance
Section 1. Chapter 163 of the Village of Cottage Grove Code of Ordinances is hereby
repealed and replaced in its entirety with Exhibit A to this Ordinance.
Section 2. This Ordinance shall become effective upon publication and notice of this
Ordinance required by Wisconsin statutes.
BY ORDER OF THE VILLAGE BOARD VILLAGE OF COTTAGE GROVE
_________________________________
Cynthia Kelm-Nelson, Village President
ATTEST: _________________________________
Lisa Kalata, Village Clerk
EXHIBIT A
Chapter 163
EROSION, SEDIMENT
AND WATER RUNOFF CONTROL
Chapter 163
EROSION, SEDIMENT AND WATER RUNOFF CONTROL
§ 163-1. General provisions.
§ 163-2. Definitions.
§ 163-3. Scope of geographic coverage;
exclusions.
§ 163-4. Technical standards and
specifications.
§ 163-5. Applicability of requirement
for erosion control permits.
§ 163-6. Applicability of requirement
for stormwater control permits.
§ 163-7. Exemptions and clarifications.
§ 163-8. Preliminary review letter.
§ 163-9. Erosion control and stormwater
control permits and
administration.
§ 163-10. Erosion control plan
requirements.
§ 163-11. Stormwater management plan
requirements.
§ 163-12. Regulations for lands or
activities not otherwise subject
to this chapter.
§ 163-13. Off-site stormwater
management.
§ 163-14. Appeals; variances.
§ 163-15. Permit fees.
§ 163-16. Enforcement.
§ 163-17. Violations and penalties.
[HISTORY: Adopted by the Village Board of the Village of Cottage Grove 2-21-2011 by Ord. No.
02-2011;1 amended in its entirety 5-16-2016 by Ord. No. 02-2016. Subsequent amendments noted
where applicable.]
GENERAL REFERENCES
Comprehensive Master Plan — See Ch. 23.
Building construction and fire prevention — See Ch. 130.
Illicit discharge detection and elimination — See Ch. 164.
Floodplain zoning — See Ch. 183.
Subdivision of land — See Ch. 274.
Water and sewers — See Ch. 312.
Wellhead protection — See Ch. 317.
Zoning — See Ch. 325.
§ 163-1. General provisions.
A. Authority. This chapter is adopted under the authority granted by ss. 61.34(1), 61.35, 61.354, 62.23
and 236.45, Wisconsin Statutes.
B. Legislative findings.
(1) The Village Board of the Village of Cottage Grove finds that construction site erosion and
uncontrolled stormwater runoff from land -disturbing and land development activities have
significant adverse impacts upon regional water resources and the health, sa fety, property and
general welfare of the community, and diminish the public enjoyment and use of natural
1. Editor’s Note: This ordinance also repealed former Ch. 163, Erosion, Sediment and Water Runoff Control, adopted 8-19-2002 by
Ord. No. 15-2002, as amended in its entirety 7 -17-2006 by Ord. No. 06-2006.
resources. Specifically, soil erosion and stormwater runoff can:
(a) Carry sediment, nutrients, pathogens, organic matter, heavy metals, toxins and other
pollutants to regional lakes, streams and wetlands;
(b) Diminish the capacity of water resources to support recreational and water supply uses and
a natural diversity of plant and animal life;
(c) Clog existing drainage systems, increasing maintenance problems and costs;
(d) Cause bank and channel erosion;
(e) Increase downstream flooding;
(f) Reduce groundwater recharge, which may diminish stream base flows and lower water
levels in regional lakes, ponds and wetlands;
(g) Contaminate drinking water supplies;
(h) Increase risk of property damage and personal injury; and
(i) Cause damage to agricultural fields and crops.
(2) The Village Board of the Village of Cottage Grove also finds that effective sediment and
stormwater management depends on proper planning, design, and timely installation of
conservation and management practices and their continuing maintenance.
C. Purpose and intent.
(1) The purpose of this chapter is to set forth the minimum requirements for construction site erosion
control and stormwater management that will diminish threats to public health, safety, public
and private property and natural resources of Village of Cottage Grove.
(2) This chapter is intended to regulate construction site erosion and stormwater runoff, to
accomplish the following objectives:
(a) Promote regional stormwater management by watershed;
(b) Minimize sedimentation, water pollution from nutrients, heavy metals, chemical and
petroleum products and other contaminants, flooding, and thermal impacts to the water
resources of Cottage Grove;
(c) Promote infiltration and groundwater recharge;
(d) Protect functional values of natural watercourses and wetlands;
(e) Provide a set of performance standards that are consistent with the standards set forth by
Dane County and the Wisconsin Department of Natural Resources' runoff management
standards contained in NR 151;
(f) Achieve reductions in sediment and phosphorus load development in approved TMDL
studies, and achieve a twenty -percent reduction in sediment load rates compared to no
controls for existing developments;
(g) Ensure no increase in the rate of surface water drainage from sites during or after
construction; and
(h) Protect public and private property from damage resulting from runoff or erosion.
(i) Ensure no increase in temperature of stormwater post -development to protect cold water
communities.
D. Abrogation and greater restrictions. It is not intended by this chapter to repeal, abrogate, annul, impair
or interfere with any existing easements, covenants, deed restrictions, agreements, rules, regulations,
ordinances or permits previously adopted or issued pursuant to law. However, wherever this chapter
imposes greater restrictions, the provisions of this chapter shall govern.
E. Interpretation. In their interpretation and application, the provisions of this chapter shall be held to be
the minimum requirements and shall not be deemed a limitation or repeal of any other power granted
by the Wisconsin Statutes. Where any terms or requirements of this chapter may be inconsistent or
conflicting, the more restrictive requirement or interpretation shall control.
F. Effective date. This chapter shall become effective immediately upon publication and posting. After
that date, all land-disturbing activities shall be in compliance with all provisions of this chapter.
§ 163-2. Definitions.
The following terms, wherever they appear in this chapter, are defined as follows:
AFFECTED — That a regulated activity has significantly:
A. Caused negative impacts on water quality or the use or maintenance of one's property or business; or
B. Endangered one's health, safety, or general welfare.
AGRICULTURAL — Related to or used for the production of food and fiber, including, but not limited to,
general farming, livestock and poultry enterprises, grazing, nurseries, horticulture, viticulture, truck
farming, forestry, sod production, cranberry productions and wild crop harvesting. Clearing and grubbin g
of an area or structural development are not agricultural activity.
AVERAGE ANNUAL RAINFALL — Measured precipitation in Madison, Wisconsin, between March 12
and December 2, 1981.
BANK EROSION — The removal of soil or rock fragments along the banks or bed of a stream channel
resulting from high flow after rain events.
BASIN — The total area drained by a waterway as designated by the Village Engineer or the total area
drained by any of the waterway's tributaries, exclusive of any other drainage area.
BMP or BEST MANAGEMENT PRACTICE — A practice, technique, or measure that is an effective,
practical means of preventing or reducing soil erosion or water pollution, or both, from runoff both during
and after land development activities. These can include structural, vegetative or operational practices.
CLOSED WATERSHED — An area that does not have a surface outlet, with water only able to leave through
evaporaton, infiltration, or mechanical means. Examples of a closed watershed include, but are not limited to:
A. Internally drained watersheds that are at least 20,000 square feet in area and at least 1 foot in depth
from invert to lowest surface outlet.
B. Watersheds with no surface outlet discharges from a 2-year, 24 hour design storm.
C. Areas that have historically not drained through surface outlets, as determined by the Village.
COMMERCIAL — For the retail or wholesale sale of goods or services.
CONNECTED IMPERVIOUSNESS — An impervious surface that is directly connected to a separate
storm sewer or water of the state via an impervious flow path.
CONSTRUCTION SITE EROSION CONTROL — Preventing or reducing soil erosion and sedimentation
from land-disturbing activity.
CONTROL PLAN — An erosion control plan required by § 163-5 or a stormwater management plan
required by § 163-6.
DESIGN STORM — A hypothetical rainstorm that occurs with a specified recurrence interval in the Village.
For example, a 10-year, 24 hour design storm defines a rainstorm that occurs over 24 hours, with a recurrence
interval of 10 years. The amounts associated with these storms are further defined as follows:
A. 1-year 24-hour design storm is 2.49 inches over 24 hours using MSE4 NRCS rainfall distribution.
B. 2 year, 24-hour design storm is 2.84 inches over 24 hours using MSE4 NRCS rainfall distribution.
C. 10-year, 24-hour design storm is 4.09 inches over 24 hours using MSE4 NRCS rainfall distribution.
D. 100-year, 24-hour design storm is 6.66 inches over 24 hours using the MSE4 NRCS rainfall distribution.
E. 200-year, 24-hour design storm is 7.53 inches over 24 hours using the MSE4 NRCS rainfall distribution.
F. 500-year, 24-hour design storm is 8.94 inches over 24 hours using the MSE4 NRCS rainfall distribution.
DEVELOPMENT — Any of the following activities:
A. Construction of a new building or other structure;
B. Expansion or alteration of an existing structure that results in an increase in the ground surface
dimensions of the building or structure;
C. Land disturbing activity; or
D. Creation of expansion of impervious surfaces.
DIRECT CONDUITS TO GROUNDWATER — Wells, sinkholes, swallets, fractured bedrock at the surface,
mine shafts, none-metallic mines, tile inlets discharging to groundwater, quarries, or depressional
groundwater recharge areas over shallow fractured bedrock.
DIRECTOR — The Director of Public Works or designee.
EASEMENT — An interest in land owned by another that creates a non-possessory right to enter and use the
property of another for specific purposes.
EASEMENT HOLDER —The holder or beneficiary of an easement that authorizes the activity on the land
for the permit sought under this chapter.
EFFECTIVE INFILTRATION AREA — The area of the infiltration system that is used to infiltrate runoff and
does not include the area used for site access, berms or pretreatment.
EROSION (SOIL EROSION) — The detachment and movement of soil or rock fragments by water, wind,
ice or gravity.
EXCAVATION — Any act by which organic matter, earth, sand, gravel, rock or any other similar material
is cut into, dug, quarried, uncovered, removed, displaced, relocated or bulldozed and shall include the
resulting conditions.
EXISTING DEVELOPMENT — Buildings and other structures and impervious area existing prior to
August 22, 2001.
FILL — Any act by which earth, sand, gravel, rock or any other material is deposited, placed, replaced,
pushed, dumped, pulled, transported, or moved to a new location and shall include the resulting conditions.
GREEN INFRASTRUCTURE — Practices that use plant or soil systems, permeable pavement or other
permeable surfaces or substrates, stormwater harvest and reuse, or landscaping to store, infiltrate, or
evaportanspirate stormwater and reduce flows to sewer systems or to surface waters. Green infrastructure
includes, but is not limited to, the following practices: rainwater harvesting/reuse, rain gardens, bioretention
systems, infiltration basins, planters that are connec ted to roof drainage, vegetated swales, permeable
pavement, green roofs, and rain barrels.
GRADING — Altering the elevation of the land surface by stripping, excavating, filling, stockpiling of soil
materials or any combination thereof and shall include the land from which the material was taken or upon
which it was placed.
GULLY EROSION — A severe loss of soil caused by or resulting in concentrated flow of sufficient
velocity to create a defined flow channel.
HEAVILY DISTURBED SITE — A site where an area of land is subjected to significant compaction due
to the removal of vegetative cover or earthmoving activities, including filling.
HYDROLOGIC SOIL GROUP (HSG) — Has the meaning used in the runoff calculation methodology
promulgated by the United States Natural Resources Conservation Service Engineering Field Manual for
Conservation Practices.
IMPERVIOUS SURFACE — Any land cover that prevents rain or melting snow from soaking into
the ground, such as roofs (including overhangs), roads, sidewalks, patios, driveways and parking lots.
For purposes of this chapter, all road, driveway or parking surfaces, including gravel surfaces, shall be
considered impervious, unless specifically designed to encourage infiltration and approved by the local
approval authority.
INFILTRATION —
A. Refers to any precipitation that does not leave the site as surface runoff. Also known as “stay on.”
B. The process by which rainfall or runoff seeps into the soil.
INFILTRATION SYSTEM — A device or practice such as a basin, trench, rain garden or swale designed
specifically to encourage infiltration, but does not include natural infiltration in pervious surfaces such as
lawns, redirecting of rooftop downspouts onto lawns or minimal infiltration from practices such as swales
or road side channels designed for conveyance and pollutant removal only.
KARST FEATURE — An area or surficial geologic feature subject to bedrock dissolution so that it is likely
to provide a conduit to groundwater, and may include caves, enlarged fractures, mine features, exposed
bedrock surfaces, sinkholes, springs, seeps or swallets.
LAND-DISTURBING ACTIVITIES — Any land alterations or disturbances that may result in soil erosion,
sedimentation, or change in runoff, including but not limited to removal of ground cover, grading,
excavating, and filling of land.
LANDOWNER — Any person holding title to or having an ownership interest in land.
LIGHTLY DISTURBED SITE — A site where an area of land is subjected to minor compaction due to the
limited removal of vegetative cover or earthmoving activities.
LOCAL LAND DIVISION ORDINANCE — Any county, city, Village or town ordinance adopted under
Chapter 236, Wis. Stats., to regulate the division of land.
MAJOR LAND-DISTURBING ACTIVITIES — Those activities where:
A. The land disturbance exceeds 20,000 square feet in area; or
B. The slope of the land exceeds 6%; or
C. The Village Engineer determines that special circumstances due to topography, proximity to
watercourses or relation to sensitive environmental areas make the disturbance a major one.
MAXIMUM EXTENT PRACTICABLE (MEP) — A level of implementing best management practices in
order to achieve a performance standard specified in this chapter which takes into account the best available
technology, cost effectiveness and other competing issues such as human safety and welfare, endangered
and threatened resources, historic properties and geographic features. MEP allows flexibility in the way to
meet performance standards and may vary based on the performance standard and site conditions.
MINOR LAND-DISTURBING ACTIVITIES — Those activities where:
A. The land disturbance does not exceed 20,000 square feet in area; and
B. The slope of the land does not exceed 6% throughout the site.
NEW DEVELOPMENT — Development that results in the cumulative increase of 20,000 square feet of
impervious surface to a site since August 21, 2001. New development can also include redevelopment.
NONEROSIVE VELOCITY — A rate of flow of stormwater runoff, usually measured in feet per second,
that does not erode soils. Nonerosive velocities vary for individual sites, taking into account topography,
soil type, and runoff rates.
PEAK FLOW — The maximum rate of flow of water at a given point in a channel, watercourse, or conduit
resulting from the predetermined storm or flood.
PERSON — Any individual, corporation, partnership, joint venture, agency, unincorporated association,
municipal corporation, county, or state agency within Wisconsin, the federal government, or any
combination thereof.
PERVIOUS SURFACE — Any land cover that permits rain or melting snow to soak into the ground.
PERMITTEE — A landowner, easement holder, or developer who has applied for a permit under this
Chapter and is responsible for the requirements of the permit.
POST-DEVELOPMENT — Refers to the extent and distribution of land cover types anticipated to occur
under conditions of full development of the submitted plan. This term is used to match pre - and post-
development stormwater peak flows as required by the chapter.
PREDEVELOPMENT — Refers to the extent and distribution of land cover types present before the
initiation of the proposed of land development activity, assuming that all land uses prior to land-disturbing
activity are in "good" condition as described in the Natural Resources Conservation Service Technical
Release 55, "Urban Hydrology for Small Watersheds" (commonly known as TR -55). This term is used to
match pre- and post-development stormwater peak flows as required by the chapter. In a situation where
the cumulative impervious surface created after August 21, 2001, exceeds the twenty-thousand-square-foot
threshold, the predevelopment conditions shall be those prior to the proposed land disturbance.
PROTECTIVE AREA — An area of land that commences at the top of the channel of lakes, streams
and rivers, or at the delineated boundary of wetlands, and extends horizontally for the width specified
in § 163-11B(7)(a) from the top of the channel or delineated wetland boundary to the closest impervious
surface. In this chapter, "protective area" does not include any area of land adjacent to any stream enclosed
within a pipe or culvert, such that runoff cannot enter the enclosure at this location.
RECHARGE — The portion of the average annual rainfall that infiltrates the soil and becomes
groundwater. Recharge does not include evaporation, transpiration, or runoff from the site.
REDEVELOPMENT — Any construction, alteration or improvement exceeding 4,000 square feet of land
disturbance performed on sites where the existing site is predominantly developed as commercial,
industrial, institutional or multifamily residential uses. Projects may include a mix of redevelopment and
new impervious surfaces. New impervious surfaces added as a result of redevelopment are subject to
§ 163-6A.
RUNOFF CURVE NUMBER (RCN) — Has the meaning used in the runoff calculation methodology
promulgated by the United States Natural Resources Conservation Service Engineering Field Manual for
Conservation Practices.
SEDIMENT — Solid earth material, both mineral and organic, that is in suspension, is being transported,
or has been moved from its site of origin by air, water, gravity or ice, and has come to rest on the earth's
surface at a different site.
SEDIMENTATION — The deposition of eroded soils at a site different from the one where the erosion
occurred.
SHEET AND RILL EROSION — A loss of soil caused by sheet flow or shallow concentrated flow, and
characterized by an absence of channeling or a relatively uniform loss across the exposed upper layer of the
soil or shallow irregular scouring of the soil surface.
SITE — The bounded area described in an erosion control plan or stormwater management plan.
SLOPE — The net vertical rise over horizontal run, expressed as a percentage, which represents a relatively
homogeneous surface incline or decline over the area disturbed.
SOIL LOSS RATE — The rate, usually measured in tons per acre per year, at which soil is transported
beyond the perimeter of a given control site and which occurs as a result of sheet and rill erosion. This term
does not apply to soil movement resulting from concentrated flow such as gully or bank erosion.
STORM EVENTS — The precipitation amounts that occur over a twenty -four-hour period that have a
specified recurrence interval for Dane County, Wisconsin. For example, one-, two-, ten-, and one-hundred-
year storm events mean the precipitation amounts that occur over a twenty -four-hour period that have a
recurrence interval of one, two, 10, and 100 years, respectively.
STORMWATER — The flow of water which results from, and which occurs during and immediately
following, a rainfall, snow- or ice-melt event.
STORMWATER MANAGEMENT — Any measures taken to permanently reduce, or minimize the
negative impacts of stormwater runoff quantity and quality after land development activities.
STORMWATER RUNOFF — The waters derived from rains falling or snowmelt or ice melt occurring
within a drainage area, flowing over the surface of the ground and/or collected in channels, watercourses
or conduits.
STREET RECONSTRUCTION — Removal and replacement of the road subgrade, where existing
stormwater conveyance systems are modified.
STRUCTURE — Any human-made object with form, shape and utility, either permanently or temporarily
attached to, placed upon, or set into the ground, stream bed or lake bed.
SUB-BASIN — A subdivision of a basin all of which drains to a single identifiable location.
TMDL or TOTAL MAXIMUM DAILY LOAD — The amount of pollutants specified as a function of one
or more water quality parameters that can be discharged per day into a water quality limited segment and
still ensure attainment of the applicable water quality standard. The USEPA and WDNR approved report
"Total Maximum Daily Loads for Total Phosphorus and Total Suspended Solids in the Rock River Basin"
dated July 2011 specifies an annual percent reduction for pollutants necessary to meet the wasteload
allocations assigned to the Village of Cottage Grove.
UNNECESSARY HARDSHIP — That circumstance where special conditions, which were not self -
created, affect a particular property and make strict conformity with regulations unnecessarily burdensome
or unreasonable in light of the purposes of this chapter.
VILLAGE — The Village of Cottage Grove.
VILLAGE AGENT — The Erosion Control Officer, the Village Engineer, the Building Inspector or
any other Village employee or official assigned or charged with the responsibility of administering and
enforcing the requirements of this chapter or any independent contractor retained by the Village for such
purpose.
VILLAGE ENGINEER — The individual, or the individual's designee, or the firm, or a representative
of the firm, appointed or retained by the Village Board to routinely provide engineering services for the
Village.
§ 163-3. Scope of geographic coverage; exclusions.
A. Within the Village. Unless specifically excluded herein, this chapter applies to all land-disturbing and
land developing activities occurring within the corporate limits of the Village.
B. Within the extraterritorial area. This chapter shall apply outside the Village limits within the
extraterritorial plat review area provided by Chapter 236, Wis. Stats., but only to those land-disturbing
activities relating to, arising from, or connected with a subdivision as defined in s. 236.02, Wis.
Stats.(12)
§ 163-4. Technical standards and specifications.
The design of all best management practices designed to meet the requirements of this chapter shall comply
with the following technical standards:
A. Natural Resources Conservation Service's "Wisconsin's Field Office Technical Guide, Chapter 4;" or
its successor;
B. Applicable construction erosion control standards by the Wisconsin Department of Natural
Resources;
C. Any other technical methodology approved by the Dane County Conservationist.
§ 163-5. Applicability of requirement for erosion control permits.
Unless expressly exempted by § 163-7, an erosion control permit under § 163-9 shall be required and all
construction site erosion control provisions of this chapter shall apply, to any of the following activities in
Village of Cottage Grove;
A. Land-disturbing activity in excess of 4,000 square feet;
B. Land-disturbing activity on a slope of greater than 12%;
C. Land-disturbing activity that involves the excavation or filling, or a combination of excavation and
filling, in excess of 400 cubic yards of material;
D. Land-disturbing activity that disturbs more than 100 lineal feet of road ditch, grass waterway or other
land area where surface drainage flows in a defined open channel; including the placement, repair or
removal of any underground pipe, utility or other facility within the cross-section of the channel;
E. Any new public or private roads or access drives longer than 125 feet;
F. Development that requires a subdivision plat, as defined in the applicable local land division
ordinance(s);
G. Land-disturbing activity that disturbs less than 4,000 square feet of land, including the installation of
access drives, that the local approval authority determines to have a high risk of soil erosion or water
pollution, or that may significantly impact a lake, stream, or wetland area. Examples of activities with
a high risk of soil erosion or water pollution may include, but are not limited to, land disturbance on
erodible soil or disturbance adjacent to lakes, rivers, streams or wetlands. All such determinations
made by the local approval authority shall be in writing, unless waived by applicant.
§ 163-6. Applicability of requirement for stormwater control permits.
Unless otherwise exempted by § 163-7, a stormwater control permit under § 163-9 shall be required and all
stormwater management provisions of this chapter shall apply to any of the following activities within the
Village of Cottage Grove:
A. Any development(s) after August 22, 2001, that result(s) in the cumulative addition of 20,000 square
feet of impervious surface to the site;
B. Agricultural development that creates new impervious surface area exceeding 20,000 square feet on
the site;
C. Any development that requires a subdivision plat, as defined in applicable local land division
ordinance(s);
D. Any development that requires a certified survey map, as defined in the applicable local land division
ordinance(s); for property intended for commercial or industrial use;
E. Redevelopment, as defined in § 163-2.
F. Other land development activities, including but not limited to redevelopment or alteration of existing
buildings and other structures, that the local approval authority determines may significantly increase
downstream runoff volumes, flooding, soil erosion, water pollution or property damage, or
significantly impact a lake, stream, or wetland area. All such determinations shall be made in writing
unless waived by the applicant.
§ 163-7. Exemptions and clarifications.
A. Any activity directly related to the planting, growing and harvesting of agricultural crops is exempt
from all requirements of this chapter;
B. The following activities are exempt from the construction site erosion control provisions of § 163-5:
(1) One- and two-family dwelling units regulated under the Wisconsin Uniform Dwelling Code.
Land-disturbing activities in excess of one acre, or not associated with the construction of a
dwelling, are not exempt from this chapter.
(2) Projects specifically exempted from local erosion control ordinances under state or federal
statute. It is the responsibility of the landowner to demonstrate such exemption with
documentation acceptable to the local approval authority.
(3) Municipal road or county highway project not exempted under § 163-7B(2) are exempt from
§ 163-11B(3) and (4) where all of the following conditions are met:
(a) The purpose of the project is only to meet current state or federal design or safety
guidelines;
(b) All activity takes place within existing public right-of-way;
(c) All other requirements of § 163-11 are met; and
(d) The project does not include the addition of new driving lanes.
C. The following activities are exempt from the infiltration standards described in § 163-11B(6):
(1) Redevelopment sites.
(2) New development sites with less than ten-percent-connected imperviousness based on complete
development of the post-construction site, provided the cumulative area of all impervious surface
is less than one acre.
(3) Agricultural facilities and practices.
(4) Areas where the infiltration rate of the soil is less than 0.6 inch/hour measured at the bottom of
the proposed infiltration system where the soil layer is not easily removed or manipulated.
(5) Expansion of roads.
D. The following activities are exempt from the protective area requirements described in § 163-11B(7):
(1) Redevelopment sites;
(2) In-fill development areas of less than five acres;
(3) Structures that cross or access surface waters, such as boat landings, bridges and culverts;
(4) Structures constructed in accordance with s. 59.692(1v), Wis. Stats.; and
(5) Post-construction sites from which runoff does not enter the surface water, except to the extent
that vegetative ground cover is necessary to maintain bank stability.
§ 163-8. Preliminary review letter.
A. A preliminary review letter provides a potential permit applicant with an initial simple evaluation of
whether erosion and stormwater control standards can be met for a proposed site, lot layout, and/or
construction design. This review is intended to assis t applicants in preparing general site plans and
other submittals necessary to obtain an erosion control and stormwater permit. A preliminary review
letter does not guarantee that an erosion or stormwater control plan will be approved or that a permit
will be issued. Erosion and stormwater control plans and permit applications must meet all applicable
standards and criteria for approval.
B. A preliminary review letter shall be required for all activities requiring an erosion control or
stormwater management permit under §§ 163-5 and 163-6.
C. Application requirements.
(1) A preliminary review letter must be submitted to and approved by the Village Engineer before
an erosion control or stormwater management permit application may be submitted.
(2) The following materials must be included in the preliminary review letter:
(a) A narrative describing the proposed project.
(b) A map showing the following information:
[1] Location of the proposed project;
[2] Limits of disturbed area;
[3] Limits of impervious area;
[4] Drainage area for each watershed area; and
[5] Location and description of proposed stormwater facilities.
(c) Preliminary runoff calculations which clearly demonstrate the adequacy of the proposed
facilities and land that will be dedicated to stormwater management for meeting the
standards of this chapter.
D. Approval process.
(1) The Village Engineer shall review the letter and determine whether erosion and stormwater
control standards can be met for a proposed site, lot layout, and/or construction design.
(2) Within 15 days of receiving the preliminary review letter, the Village Engineer shall either
approve the preliminary plan or notify the applicant of any deficiencies.
(3) The Village Engineer shall notify the applicant in writing of any deficiency in the preliminary
plan and the applicant shall be given an opportunity to correct any deficiency.
(4) Approval of a preliminary review letter does not guarantee that an erosion or stormwater control
plan will be approved or that a permit will be issued. Erosion and stormwater control plans and
permit applications must meet all applicable standards and criteria for approval.
§ 163-9. Erosion control and stormwater control permits and administration.
A. No activity meeting the criteria described in §§ 163-5 and 163 -6 shall occur and no zoning permit
may be issued until an erosion control and stormwater control permit is issued by the Village.
B. The applicant must provide the following when requesting a permit:
(1) Completed application form:
(a) The application must be signed by the landowner, easement holder, or include a notarized
statement signed by the landowner or easement holder authorizing the applicant to act as
the landowner's or easement holder’s agent and bind the landowner to the terms of this
chapter.
(b) If a landowner or easement holder appoints an agent to submit an application pursuant to
Subsection B(1) (a), the landowner or easement holder shall be bound by all of the
requirements of this chapter and the terms of any permit issued to the agent. If the applicant
is an easement holder or an agent of an easement holder, the applicant must provide the
landowner notice and a copy of the permit application and all suppor ting documentation.
The Village will provide the landowner with copies of all permits and notifications issued
regarding permit applications.
(2) Fees as required by § 163-15.
(3) Copy of preliminary review letter, as described in § 163-8.
(4) If required by § 163-5, an erosion control plan meeting all the standards of § 163-10A and C, or
a simplified checklist as described in § 163-10B.
(5) If required by § 163-6, a stormwater management plan meeting all of the standards of § 163-11
and a draft maintenance agreement as described in § 163-11A(8).
(6) Copies of permits or permit applications or approvals required by any other governmental entity.
(7) A proposed timetable and schedule for completion and installation of all elements of approved
erosion control and stormwater management plans and a detailed schedule for completion of
construction.
(8) An estimate of the cost of completion and installation of all elements of the approved erosion
control and stormwater management plans.
(9) Evidence of financial responsibility to complete the work proposed in the plan. For major land-
disturbing activities, the applicant shall provide, prior to issuance of the permit, an irrevocable
letter of credit, certificate of deposit or certified check to the Village in an amount equal to 125%
of the estimated cost of all required control measures as determined by the Village Engineer.
The security deposited shall guarantee that all required control measures will be taken or
installed according to the approved plan. The security shall remain in full force until released by
the Village Board, and only after an inspection by the Village Engineer assures that all required
control measures have been fully and satisfactorily completed. The Village shall have the right
to draw upon the security for purposes of obtaining compliance with the approved control plan
as it deems necessary. If the erosion and runoff control requirements of this chapter are included
as part of plat or certified survey map conditions of approval, then, security for performance of
the control requirements may be included as part of the overall security required for installation
of improvements under Chapters 23, 274 and 325 of the Village Ordinances.
C. Approval process.
(1) Major land-disturbing activities.
(a) The Village Engineer shall verify that the permit application is complete under § 163-9B
and review the plan(s) for compliance with the standards identified in §§ 163-10 and 163-
11. The Village may request additional information at any time to determine ordinance
compliance.
(b) The Village Engineer shall either approve the submitted plan or notify the applicant in
writing of any deficiencies, within 30 days of receipt of the control plan. Staff engaged in
this review and approval process shall be certified where appropriate by the Wisconsin
Department of Safety and Professional Services for this purpose.
(2) Minor land-disturbing activities.
(a) The Village Agent shall verify the permit application is complete under § 163-9B and
review the plan for compliance with this chapter in accordance with the Erosion Control
Checklist attached hereto and incorporated herein as Exhibit A2 established by the Village
Engineer and approved by the Village Board. The Village may request additional
information at any time to determine ordinance compliance.
(b) The Village Agent shall approve, reject or conditionally approve the plan within the same
number of working days as required for issuance of a building permit, but in no event more
than three working days after receipt of the completed control plan statement. If the control
plan statement is rejected or conditionally approved, the applicant shall be informed, in
writing, of the reasons for rejection or conditions of approval. Staff engaged in this review
and approval process shall be certified where appropriate by the Wisconsin Department of
Safety and Professional Services for this purpose.
(3) Where installed stormwater practices will be privately owned, an affidavit which describes the
property by legal description, notifying future prospective purchasers of the existence of a
stormwater permit (which is on file at Village Hall) issued under th is chapter and applicable
plan, timetables and potential liability imposed by § 163-16C for failure to bring the property
into compliance with this chapter after notification, shall be recorded with the Dane County
Register of Deeds prior to issuance of an erosion and stormwater control permit. The foregoing
information shall also be noted on every plat and certified survey map.
(4) Upon approval of the Village Engineer, the erosion control or stormwater management permit
shall be issued by the Village after the applicant has met all other requirements of this chapter.
D. Permit conditions.
(1) The plan shall be implemented prior to the start of any land -disturbing activity and shall be
maintained over the duration of the project. Stormwater components of the plan shall be
maintained in perpetuity.
(2) The permittee is responsible for successful completion of the erosion control plan and the
stormwater management plan. The permittee shall be liable for all costs incurred, including
environmental restoration costs, resulting from noncompliance with an approved plan.
(3) Application for a permit shall constitute express permission by the permittee and landowner for
the Village Agent to enter the property for purposes of inspection under Subsection E or curative
action under § 163-16C. The application form contains a prominent provision advising the
applicant and landowner of this requirement.
(4) All incidental mud-tracking off site onto adjacent public thoroughfares shall be cleaned up and
removed by the end of each working day using proper disposal methods.
(5) A copy of the approved permit and erosion control plan shall be kept on the project site, in a
place readily accessible to contractors, engineers, local approval authority inspection staff and
other authorized personnel.
E. Inspections.
(1) Application for a permit under this chapter shall constitute permission by the applicant and
2. Editor's Note: Said exhibit is on file in the Village offices.
landowner for the Village Agent to enter upon the property and inspect during the construction
phase prior to the inspections pursuant to Subsection E(4) and (6), as necessary to confirm
compliance with the requirements of this chapter.
(2) As part of the plan approval process, the Village Agent shall determine the minimum number of
inspections required to assure compliance. The site of any regulated land-disturbing activity shall
be inspected once every 30 days, or more frequently as determined by the Village Engineer during
the construction phase with assistance from the Erosion Control Officer and/or Building
Inspector. The Village Agent's compliance inspections do not relieve the permittee from
performing and documenting their own inspections required by ch. NR 151, Wis. Adm. Code.
(3) Within 10 days after installation of all practices in an approved erosion control plan and
achievement of soil stabilization, the permittee shall notify the Village Clerk and Erosion Control
Officer. The permittee shall inspect the site weekly and prior to every forecasted rain fall of ½
inch or greater.
(4) The Village Agent shall inspect the property to verify compliance with the erosion control plan
within 10 days of notification of soil stabilization.
(5) Within 10 days after installation of all practices in an approved stormwater management plan,
the permittee shall notify the Village Clerk and submit drawings documenting construction. The
person who designed the stormwater management plan for the permittee shall submit as -built
certification to ensure that constructed stormwater management practices and conveyance
systems comply with the specifications included in the approved plans. At minimum, as-built
certification shall include a set of drawings comparing the approved stormwater management
plan with what was constructed. Other information shall be submitted as required by the Village
Engineer, Building Inspector, or Erosion Control Officer.
(6) The Village Agent shall inspect the property to verify compliance within 10 days of notification.
(7) Maintenance is the responsibility of the owner, and facilities are subject to inspection and orders
for repairs.
F. Permit transfers.
(1) The affidavit [required in § 163-9C(3)] describing the property by legal description and notifying
future prospective purchasers of the existence and responsibilities associated with the stormwater
permit on file at Village Hall runs with the property.
(2) The permittee may not transfer interest in property subject to an approved plan prior to
completion of the proposed steps to attain soil stabilization without Village approval.
(3) When a permittee and landowner transfers ownership, possession or control of real estate subject
to either or both an uncompleted erosion control or stormwater management plan, the successor
in interest to any portion of the real estate shall be responsible to control soil erosion and runoff
and shall comply with the minimum standards provided in this chapter.
(4) When ownership, possession or control of property subject to an uncompleted erosion control or
stormwater management plan, or both, is transferred, the former owner (seller) shall notify the
new owner (buyer) as to the current status of compliance with notice to the authority, and provide
a copy of the erosion control plan or stormwater management plan, or both.
(5) Transfers of interest in real estate subject to an approved, uncompleted plan may be conducted
consistent with this chapter under any of the following arrangements:
(a) The transferee shall file a new, approved erosion control or stormwater management plan,
or both, with the authority;
(b) The transferee shall obtain an approved assignment from the authority as sub-permittee to
complete that portion of the approved plan regulating soil erosion and runoff on the
transferee's property.
(c) The permittee shall provide the authority with a duly completed and executed continuing
surety bond or certified check in an amount sufficient to complete the work proposed in
the approved plan; at the time of transfer, the permittee may seek to reduce the surety bond
or certified check to the appropriate amount to complete remaining work. If the transferor
enters into escrow agreements with transferees to complete an approved plan, these funds
shall be available to the authority to attain plan compliance. When an approved erosion
control plan and, if required, a stormwater management plan is or ar e not completed as
proposed, the authority may use the surety bond to complete remaining work to achieve
plan compliance.
G. Plan or permit amendments. Any proposed modifications to approved plans, construction schedules
or alterations to accepted sequencing of land-disturbing site activities shall be approved by the Village
Engineer in consultation with the Erosion Control Officer or Building Inspector prior to
implementation of said changes. One permit revision is allowed at no charge. The second and
subsequent revisions, to a maximum of five revisions, cost $50 each.
H. Timeframe and Expiration.
(1) Erosion control plan construction must begin within one year from date of filing a complete
application.
(2) Except as otherwise specified, all permit applications will expire the sooner of:
(a) One year after the applicant is notified of, but does not adequately address, a deficiency; or
(b) Three years from date of filing a complete application.
(3) Erosion control permits will expire the sooner of:
(a) Upon the stabilization date in the approved plan; or
(b) three years after permit issuance.
§ 163-10. Erosion control plan requirements.
A. The erosion control plan shall meet the more stringent requirements between those identified in this
chapter and those identified in the most current version of Dane County erosion control ordinance
requirements.
B. Plan materials. Erosion control plans required under § 163-5 may include consideration of adjoining
landowners' cooperative efforts to control transport of sediment and, except as specifically exempted
below, shall include at a minimum the following information:
(1) Property lines, lot dimensions, and limits of disturbed area, including areas within five (5) feet of the
property line;
(2) Limits of impervious area, including buildings. Include all public and private roads, interior
roads, driveways and parking lots, and indicate type of paving and surface material;
(3) All natural and artificial water features including, but not limited to, lakes, ponds, streams
(including intermittent streams), and ditches; and areas of natural woodland or prairie. The plan
must show ordinary high-water marks of all navigable waters, one-hundred-year flood elevation
and delineated wetland boundaries. A certified flood zone determination and/or wetland
delineation may be required at the applicant's expense;
(4) Cross sections of and profiles of channels, swales and road ditches;
(5) Culvert sizes;
(6) Direction of flow of runoff;
(7) Watershed size for each drainage area;
(8) Design discharge for ditches and structural measures;
(9) Runoff velocities;
(10) Fertilizer and seeding rates and recommendations;
(11) Time schedules for stabilization of ditches and slopes;
(12) Description of methods by which sites are to be developed and a detailed land disturbance
schedule including time schedules for stabilization of ditches and slopes;
(13) Provision for sequential steps mitigating erosive effect of land -disturbing activities to be
followed in appropriate order and in a manner consistent with accepted erosion control
methodology suitable to proposed sites and amenable to prompt revegetation, including runoff
calculations as appropriate;
(14) Provisions to prevent mud -tracking off site onto public thoroughfares during the construction
period;
(15) Provisions to prevent the discharge of sediment from dewatering activities;
(16) Provisions to disconnect impervious surfaces, where feasible;
(17) Provisions to prevent sediment delivery to, and accumulation in, any proposed or existing
stormwater conveyance systems (both on-site and off-site);
(18) Copies of permits or permit applications required by any other unit of government or agency;
(19) Existing and proposed elevations (referenced to the North American Vertical Datum of 1988)
and existing and proposed contours in the area, where deemed necessary.
(20) Any other information necessary to reasonably determine the location, nature and condition of
any physical or environmental features of the site;
(21) Provisions to prevent the transport by runoff of chemicals, cement and other building compounds
and materials on the construction site during the construction period;
(22) Areas of natural woodland or prairie.
C. Simplified plan checklist. For minor land-disturbing activities, as defined in § 163-2, applicants may
submit erosion control proposals using simplified checklists of standard erosion control practices, on
a standard form established by the Village Engineer and approved by the Village Board and a simple
map and site development schedule. Simplified plan checklists shall be reviewed by the Village Agent
for completeness and accuracy.
D. Erosion control performance standards.
(1) Proposed design, suggested location and phased implementation of effective, practicable erosion
control measures for plans shall be designed, engineered and implemented to achieve the
following results:
(a) Prevent gully and bank erosion;
(b) Limit total off-site permissible annual aggregate soil loss for exposed areas resulting from
sheet and rill erosion to an annual, cumulative soil loss rate not to exceed five tons per acre
annually; and
(c) Discharges from new construction sites must have a stable outlet capable of carrying
designed flow as required in § 163-11B(4), at a nonerosive velocity. Outlet design must
consider flow capacity and flow duration. This requirement applies to both the site outlet
and the ultimate outlet to stormwater conveyance or waterbody.
(d) Prevent or reduce all of the following:
1. The depositing of soil from being tracked onto streets by vehicles.
2. The discharge of sediment from disturbed areas into on-site storm water inlets.
3. The discharge of sediment from disturbed areas into adjacent waters of the State of
Wisconsin.
4. The discharge of sediment from drainage ways that flow off the site.
5. The discharge of sediment by dewatering activities.
6. The discharge of sediment eroding from soil stockpiles existing for more than 7 days.
7. The transport by runoff chemicals, cement, and other building compounds and
materials on a construction site during construction.
(2) Plan compliance under Subsection C(1) shall be determined using the Wisconsin Department of
Natural Resources' Construction Site Soil Loss and Sediment Discharge Calculation Guidance
(effective June 2015 or current version),or another commonly accepted soil erosion
methodology approved by the Dane County Conservationist, that considers season of year, site
characteristics, soil erodibility and slope.
(3) Erosion control measures for plan approval need not attempt to regulate soil transportation
within the boundaries of the applicant's site.
(4) Implementation. Permittees shall implement BMPS as follows:
(a) Erosion and sediment control practices shall be constructed or installed before land
disturbing activities begin.
(b) Erosion and sediment control practices must be maintained until final stabilization.
(c) Final s activity shall commence when land disturbing activity ceases and final grade has
been reached on any portion of the site.
(d) Temporary stabilization activity shall commence when land disturbing activity has
temporarily ceased and will not resume for a period exceeding 14 calendar days.
(e) BMPs that are no longer necessary for erosion and sediment control must be removed.
(5) Grading within (5) feet of property line. Except as authorized in this section, the topography
within five (5) feet of any property line shall remain unchanged during development.
(a) When land disturbing activity associated with development occurs within five (5) feet of
any property line, finished grades in that area shall be restored to the topography in
existence before the land disturbing activity began. A positive slope of one-half (1/2) inch
vertical per one (1) foot horizontal within five (5) feet of the property line is allowed to
provide proper drainage away from a one or two family residence.
(b) The established grade of the adjoining property shall determine the finished grade at the
property line for any development. The owner of the property under development bears the
burden of proof as to the established grade at the property line and the topo graphy within
five (5) feet of the property line.
(c) Existing drainage ways and drainage easements along property lines shall be maintained
including, but not limited to, natural watercourses and stormwater management areas
shown on plats and certified survey maps.
(d) Development in Floodplain Districts requiring fill to comply with Village ordinances is
exempt from this subsection.
(e) The director may authorize grading resulting in changes to the existing topography at and
within five (5) feet of any property line, if the applicant establishes the following:
1. The intent of the grading and an explanation of its necessity, and
2. Stormwater runoff will not negatively affect adjacent properties.
§ 163-11. Stormwater management plan requirements.
A. Any stormwater management plan must meet the more stringent requirements between those
identified in this Chapter and those identified in the most current Dane County requirements.
B. Plan materials. Stormwater management plans shall satisfy all of the requirements in Subsection B,
and shall address at a minimum the following information:
(1) A narrative describing the proposed project, including implementation schedule for planned
practices;
(2) Identification of the entity responsible for long-term maintenance of the project;
(3) A map showing drainage areas for each watershed area;
(4) A summary of runoff peak flow rate calculations, by watershed area, including:
(a) Preexisting peak flow rates;
(b) Post-construction peak flow rates with no detention;
(c) Post-construction peak flow rates with detention;
(d) Assumed runoff curve numbers (RCNs); and
(e) Time of concentration (Tc) used in calculations.
(5) A complete site plan and specifications, signed by the person who designed the plan. All plans
shall be drawn to an easily legible scale, shall be clearly labeled, and shall include, at a minimum,
all of the following information:
(a) Property lines and lot dimensions;
(b) All buildings and outdoor uses, existing and proposed, including all dimensions and
setbacks;
(c) All public and private roads, interior roads, driveways and parking lots. Show traffic
patterns and type of paving and surfacing material;
(d) All natural and artificial water features, including, but not limited to, lakes, ponds, streams
(including intermittent streams), and ditches. Show ordinary high -water marks of all
navigable waters, one-hundred-year flood elevations and delineated wetland boundaries, if
any. If not available, appropriate flood zone determination or wetland delineation, or both,
may be required at the applicant's expense;
(e) Protective areas as defined in Subsection B(7)(a);
(f) Depth to bedrock;
(g) Depth to seasonal high-water table;
(h) The extent and location of all soil types as described in the Dane County Soil Survey,
slopes exceeding 12%, and areas of natural woodland or prairie;
(i) Existing and proposed elevations (referenced to the North American Vertical Datum of
1988, where available) and existing and proposed contours in the area requiring a grading
and filling permit;
(j) Elevations, sections, profiles, and details as needed to describe all natural and artificial
features of the project;
(k) Soil erosion control and overland runoff control measures, including runoff calculations as
appropriate;
(l) Detailed construction schedule;
(m) Copies of permits or permit applications required by any other governmental entities or
agencies;
(n) Any other information necessary to reasonably determine the location, nature and condition
of any physical or environmental features;
(o) Location of all stormwater management practices;
(p) All existing and proposed drainage features;
(q) The location and area of all proposed impervious surfaces; and
(r) The limits and area of the disturbed area.
(6) Engineered designs for all structural management practices;
(7) A description of methods to control oil and grease or written justification for not providing such
control;
(8) A maintenance plan and schedule for all permanent stormwater management practices as
recorded on the affidavit required in § 163-9C(3).
(9) If necessary, a description and plans to control temperature of runoff.
(10) A summary of infiltration calculations including:
(a) Pre-development infiltration volume.
(b) Calculated infiltration volume goal.
(c) Achieved post-development infiltration volume.
(11) Flood elevation for a 200-year design storm and proposed minimum opening elevation.
C. Stormwater management performance standards. Proposed design, suggested location and phased
implementation of effective, practicable stormwater management measures for plans shall be
designed, engineered and implemented to achieve the following results:
(1) Sediment control.
(a) For new development, design practices to retain soil particles greater than five microns on
the site resulting from a one -year twenty-four-hour storm event (2.5 inches over twenty -
four-hour duration), according to approved procedures, and assuming no sediment
resuspension; or design practices to achieve an eighty-percent reduction in sediment loads
based on average annual rainfall.*
[1] For new development, design practices to achieve a fifty-four-percent reduction in
total phosphorus loads based on average annual rainfall.
(b) For redevelopment resulting in exposed surface parking lots and associated traffic areas,
design practices to achieve the following reductions in sediment loads based on average
annual rainfall: 55% for sites within the Koshkonong watershed, and 62% for sites within
the Yahara watershed.
[1] For redevelopment resulting in exposed surface parking lots and associated traffic
areas, design practices to achieve a 54% reduction in total phosphorus loads based on
average annual rainfall.
[2] Under no circumstances shall the site's existing sediment or phosphorus control level
or trapping efficiency be reduced as a result of the redevelopment.
[3] Note: the 80% reduction based on average annual rainfall standard and the five -
micron particle trapping standard are considered generally equivalent.
(2) Oil and grease control. For all stormwater plans for commercial or industrial developments and
all other uses where the potential for pollution by oil or grease, or both, exists, the first 0.5 inch
of runoff will be treated using the best oil and grease removal technology available. This
requirement may be waived by the plan reviewer only when the applicant can demonstrate that
installation of such practices is not necessary.
(3) Runoff rate control, hydrologic calculations. All runoff calculations shall be according to the
methodology described in the Natural Resources Conservation Service's Technical Release 55,
"Urban Hydrology for Small Watersheds" (commonly known as TR-55), or other methodology
approved by the Dane County Conservationist. The maximum runoff curve number (RCN) used
in such calculation shall be the TR-55 specified curve numbers for other land uses shall be used
for predevelopment conditions. For post-development conditions, heavily disturbed sites will be
lowered one permeability class for hydrologic calculations. Lightly disturbed areas require no
modification. Where practices have been implemented to restore soil structure to predeveloped
conditions, no permeability class modification is required.
Table 1 - Maximum Predevelopment Runoff Curve Numbers
Runoff Curve Number Hydrologic Soil Group*
A B C D
Woodland 30 55 70 77
Grassland 39 61 71 78
Cropland 51 68 78 83
NOTE:
* When dual HSGs are specified, the drained condition shall be assumed.
(4) Runoff rate control, design standards. Hydrologic analyses shall utilize the MSE4 NRCS rainfall
distribution. Except for redevelopment projects, all stormwater facilities shall be designed,
installed and maintained to effectively accomplish the following:
(a) Maintain predevelopment peak runoff rates for the one-year, twenty-four-hour storm event
(2.49 inches over 24 hours' duration).
(b) Maintain predevelopment peak runoff rates for the two-year, twenty-four-hour storm event
(2.84 inches over 24 hours' duration).
(c) Maintain predevelopment peak runoff rates for the ten-year, twenty-four-hour storm event
(4.09 inches over 24 hours' duration).
(d) Maintain predevelopment peak runoff rates for the one -hundred-year, twenty -four-hour
storm event (6.66 inches over 24 hours' duration).
(e) Maintain predevelopment peak runoff rates for a two-hundred year, twenty four hour storm
event (7.53 inches over 24 hours’ duration).
(5) Outlets. Discharges from new construction sites must have a stable outlet capable of carrying
designed flow as required in Subsection B(4), at a nonerosive velocity. Outlet design must
consider flow capacity and flow duration. This requirement applies to both the site outlet and the
ultimate outlet to stormwater conveyance or water body.
(6) Infiltration.
(a) For both residential and nonresidential developments, design practices to infiltrate
sufficient runoff volume so that post-development infiltration volume shall be at least 90%
of pre-development infiltration volume, based on average annual rainfall.
(b) If, when designing appropriate infiltration systems, more than 2% of the site is required to
be used as effective infiltration area, the applicant may alternately design infiltration
systems and pervious surfaces to meet or exceed the annual predevelopment recharge rate.
The annual predevelopment recharge rate shall be determined from the Wisconsin
Geological and Natural History Survey's 2009 Report, Groundwater Recharge in Dane
County, Estimated by a GIS-Based Water-Balanced Model, or subsequent updates to this
report, or by a site -specific analysis using other appropriate techniques. If this alternative
design approach is taken, at least 2% of the site must be used for infiltration.
(c) Pretreatment. Before infiltrating runoff, pretreatment shall be required for parking lot
runoff and for runoff from new road construction in commercial, industrial and institutional
areas that will enter an infiltration system. The pretreatment shall conform to the design
standards in section 163-4 and designed to protect the infiltration system from clogging prior
to scheduled maintenance and to protect groundwater quality.
(d) Separation distances. Infiltration practices shall be located so that the characteristics of the
soil and the separation distance between the bottom of the infiltration system and the
elevation of seasonal high groundwater or the top of competent bedrock are shown in Table
2.
Table 2
Source Area Separation Distance Soil Characteristics
Industrial, Commercial,
Institutional, Parking
Lots, and Roads
5 feet or more Filtering layer
Residential arterial roads 5 feet or more Filtering layer
Roofs draining to
subsurface infiltration
practices
1 foot or more Native or engineered soil
with particles finer than
coarse sand
Roofs draining to surface
infiltration practices
Not applicable Not applicable
All other impervious
source areas
5 feet or more Filtering layer
(e) Prohibitions. Notwithstanding Subsection B(6)(a) through (c), infiltration systems may not
be installed in any of the following areas:
[1] Areas associated with Tier 1 industrial facilities identified in s. NR 216.21(2)(a), Wis.
Admin. Code, including storage, loading, rooftop and parking.
[2] Storage and loading areas of Tier 2 industrial facilities identified in s. NR
216.21(2)(b). Wis. Admin. Code.
[3] Fueling and vehicle maintenance areas.
[4] Areas within 1,000 feet up gradient or within 100 feet down gradient of karst features
or direct conduits to groundwater.
[5] Areas with less than three feet separation distance from bottom of the infiltration
system to the elevation of seasonal high groundwater or the top of bedrock, except
that this provision does not prohibit infiltration of roof runoff.
[6] Areas with runoff from industrial, commercial and institutional parking lots and roads
and residential arterial roads with less than five feet separation distance from the
bottom of the infiltration system to the elevation of seasonal high groundwater or the
top of bedrock.
[7] Areas within 400 feet of a community water system well as specified in s. NR
811.16(4), Wis. Admin. Code, for runoff infiltrated from commercial, industrial and
institutional land uses or regional devices for residential development.
[8] Areas where contaminants of concern, as defined in s. NR 720.03(2), Wis. Admin.
Code, are present in the soil through which infiltration will occur.
[9] Any area where the soil does not exhibit one of the following characteristics between
the bottom of the infiltration system and the seasonal high groundwater and top of
bedrock: at least a five-foot soil layer with 10% fines or greater. This provision does
not apply where the soil medium within the infiltration system provides an equivalent
level of protection and does not prohibit infiltration of roof runoff.
(f) Alternate use of runoff. Where alternate uses of runoff are employed, such as flushing,
laundry or irrigation, such alternate use shall be given equal credit toward the infiltration
volume required by this section.
(g) Minimizing groundwater pollution. According to ch. NR 151, Wis. Admin. Code,
infiltration systems designed in accordance with this section shall, to the extent technically
and economically feasible, minimize the level of pollutants infiltrating to groundwater and
shall maintain compliance with the preventive action limit at a point of standards
application in accordance with ch. NR 140, Wis. Admin. Code. However, if site -specific
information indicates that compliance with the preventive action limit is not achi evable,
the infiltration system may be not installed or shall be modified to prevent infiltration to
the maximum extent practicable.
(h) The maximum pre -development runoff curve number (RCN) used in such calculations
shall be those shown in Table 1.
(7) Protective areas.
(a) All sites, except those exempted under § 163-7D, shall be designed to maintain a protective
area of the following minimum protective area widths:
[1] For outstanding resource waters and exceptional resource waters, and for wetlands in
areas of special natural resource interest as specified in s. NR 103.04, 75 feet.
[2] For perennial and intermittent streams identified on a United States geological survey
7.5-minute series topographic map, or a county soil survey map, whichever is more
current, 50 feet.
[3] For lakes, 50 feet.
[4] For highly susceptible wetlands, 50 feet. Highly susceptible wetlands include the
following types: fens, sedge meadows, bogs, low prairies, conifer swamps, shrub
swamps, other forested wetlands, fresh wet meadows, shallow marshes, deep marshes
and seasonally flooded basins. Wetland boundary delineations shall be made in
accordance with s. NR 103.08(1m). This subsection does not apply to wetlands that
have been completely filled in accordance with all applicable state and federal
regulations. The protective area for wetlands that have been partially filled in
accordance with all applicable state and federal regulations shall be measured from
the wetland boundary delineation after fill has been placed.
[5] For less susceptible wetlands, 10% of the average wetland width, but no less than 10
feet, nor more than 30 feet. Less susceptible wetlands include degraded wetlands
dominated by invasive species such as reed canary grass; cultivated hydric soils; and
any gravel pits, dredged material or fill material disposal sites that take on the
attributes of a wetland.
[6] For concentrated flow channels with drainage areas greater than 130 acres, 10 feet.
[7] In Subsection B(7)(a)[1], [4] and [5], determinations of the extent of the protective
area adjacent to wetlands shall be made on the basis of the sensitivity and runoff
susceptibility of the wetland in accordance with the standards and criteria in s. NR
103.03, Wis. Adm. Code.
(b) The following requirements shall be met in protective areas:
[1] Impervious surfaces shall be kept out of the protective area to the maximum extent
practicable. The stormwater management plan shall contain a written site -specific
explanation for any parts of the protective area that are disturbed during construction.
[2] Where land -disturbing construction activity occurs within a protective area, and
where no impervious surface is present, adequate sod or self -sustaining vegetative
cover of 70% or greater shall be established and maintained. The adequate sod or self-
sustaining vegetative cover shall be sufficient to provide for bank stability,
maintenance of fish habitat and filtering of pollutants from upslope overland flow
areas under sheet flow conditions. Nonvegetative materials, such as rock riprap, may
be employed on the bank as necessary to prevent erosion, such as on steep slopes or
where high velocity flows occur.
[3] Best management practices, such as filter strips, swales, or wet detention basins, that
are designed to control pollutants from nonpoint sources may be located in the
protective area.
D. Stormwater management goals. The following standards shall be met whenever possible, and
proposed design, suggested location and implementation of practices to meet these goals shall be
included in plans:
(1) For existing development, design practices to retain soil particles greater than 40 microns on the
site (twenty -percent reduction) resulting from a one -year twenty -four-hour storm event,
according to approved procedures, and assuming no sediment resuspension.
(2) For street reconstruction, design practices to retain soil particles greater than 20 microns on the
site (forty-percent reduction) resulting from a one-year, twenty-four-hour storm event, according
to approved procedures, and assuming no sediment resuspension.
E. Control measures. All water runoff control measures shall require approval of the Village Engineer.
Control measures may include, but are not limited to, infiltration basins, detention ponds, and swales.
In addition to the following technical standards referred to in § 163-4, control measures installed
within the Village must be designed and constructed according to the following standards:
(1) All slopes shall be at least 4:1 or flatter (four feet horizontal to one foot vertical).
§ 163-12. Regulations for lands or activities not otherwise subject to this chapter.
Notwithstanding any other provisions of this chapter, it shall be a violation of this chapter for any person to
create, permit, establish, maintain or allow to be maintained any condition or activity that causes excessive
runoff or erosion to adjacent land, public streets or water bodies. Penalties and remedies may be sought for
such activities as provided in § 163-17. Erosion and runoff is excessive when in the opinion of the
Village Engineer or Building Inspector an unsafe condition results in the streets, sedimentation occurs in
lakes and streams, environmentally sensitive lands are threatened, runoff endangers downstream property,
or the public health, safety or general welfare of the citizens of the Village of Cottage Grove is otherwise
threatened or harmed.
§ 163-13. Off-site stormwater management.
A. When the Village Board determines, based on a drainage study conducted and prepared by a qualified
professional engineer, that off-site water runoff control measures best serve the interests of the public
and the environment, then the Board may allow or require off-site water runoff control as a condition
of approval of a land disturbance permit. When off -site water runoff control is permitted or required
as specified in § 163-11B(4), prior to final approval by the Board, the permit applicant shall obtain
written permission from any and all property owners who would experience increases in the amount
of water runoff entering their land from a two-, a ten-, or a one-hundred-year, twenty-four-hour design
storm or whose property is threatened by virtue of additional soil saturation. The Village Board will
act on behalf of any and all affected public lands, public drainageways, storm sewers or other public
waterways.
B. Developments served by off -site stormwater management facilities will be charged a fee -in-lieu of
detention. Fees-in-lieu will be set by the Village and based on the level of service provided to the
applicant by the off-site facility.
C. Off-site stormwater management is only allowed when all of the following conditions for the off-site
facility are met:
(1) The facility is in place;
(2) The facility is designed and adequately sized to provide a level of stormwater control that at
least meets the ordinance standards;
(3) The facility has a legally obligated entity responsible for its long-term operation and
maintenance.
D. Permit applicants may be required to install and maintain temporary facilities designed to meet the
standards of this chapter, if an off-site facility that will serve the proposed development is planned but
does not yet meet the conditions of Subsection C. Temporary facilities must be maintained by the
applicant until that time that the off -site facility meets the conditions of Subsection C. Applicants
required to install and maintain temporary facilities will also be charged a fee-in-lieu.
§ 163-14. Appeals; variances.
A. Appeals.
(1) Any person aggrieved by any decision of the Village Agent pursuant to this chapter may appeal
to the Zoning Board of Appeals. Such appeal shall be taken within 30 days after the challenged
decision. Notice of appeal setting forth the specific grounds for the appeal shall be filed with the
Village Clerk. A fee of an amount set by the Village in the annual fee schedule resolution must
accompany any appeal request involving a land -disturbing activity. The Zoning Administrator
shall forthwith transmit to the Zoning Board of Appeals the reco rd upon which the action
appealed from was taken.
(2) The Zoning Board of Appeals shall publish a Class 2 notice thereof under ch. 985, Wis. Stats.,
as well as give due notice to the parties in interest. The Board shall hear and decide variance and
appeal requests within 30 days of receipt of written request and payment of the appeal fee. Upon
the hearing any party may appear in person or by agent or attorney.
(3) The Zoning Board of Appeals may, in conformity with the provisions of this chapter, reverse or
affirm, wholly or partly, or modify the order, requirement, decision or determination appealed
from and may make such order, requirement decision or determination as ought to be made, and
shall have all the powers of the officer from whom the appeal is taken.
(4) The concurring vote of a majority of the Zoning Board of Appeals shall be necessary to reverse
the decision of the Village Engineer.
B. Variances.
(1) An applicant may include in the application a request for a variance from the requirements of
§ 163-10 or § 163-11. No variance shall be granted unless the applicant demonstrates and the
Village Engineer, in consultation with the Zoning Administrator, finds that all of the following
conditions are present:
(a) Enforcement of the standards set forth in this chapter will result in unnecessary hardship
to the landowner;
(b) The hardship is due to exceptional physical conditions unique to the property;
(c) Granting the variance will not adversely affect the public health, safety or welfare, nor be
contrary to the spirit, purpose and intent of this chapter;
(d) The project will have no impact upon any of the stated purposes of this chapter as set forth
in § 163-1C;
(e) The applicant has proposed an alternative to the requirement from which the variance is
sought that will provide equivalent protection of the public health, safety and welfare, the
environment and public and private property;
(f) The net cumulative effect of the variance will not impact downstream conditions; and
(g) Existing regional facilities are shown to meet the performance standards of this chapter.
(2) If all of the conditions set forth in Subsection B(1) are met, a variance may only be granted to
the minimum extent necessary to afford relief from the unnecessary hardship, with primary
consideration to water quality.
(3) A variance from the provisions of § 163-11B(1) and (2) may only be granted if:
(a) The applicant has met the requirements of § 163-14B(1); and
(b) The applicant will be denied all reasonable and beneficial use of the property if the variance
is denied.
(4) A person aggrieved by a variance determination by the Village Engineer and/or Zoning
Administrator may appeal the decision to the Zoning Board of Appeals pursuant to Subsection
B(1).
(5) A person aggrieved by a decision of the Zoning Board of Appeals regarding a variance may
appeal that decision to Dane County Circuit Court.
§ 163-15. Permit fees.
A. Major. The application fee for a major land -disturbing activity permit shall be an amount set by
Village in the annual fee schedule resolution, of which a portion will cover administration and
inspections, and the remainder will be a deposit which is refundable unless violations occur and have
to be taken care of by the Village. In addition to this fee, before any permit will be issued, the applicant
must pay the actual engineering fees or expenses incurred by the Village in connection with review of
the control plan and the engineering fees or expenses estimated to be incurred for on -site inspection
during the project. Where plat or certified survey map review fees are paid pursuant to Chapters 23,
274 and 325 of the Village Ordinances for the same project covered by the proposed land-disturbing
activity permit, then the application fee will be waived. Where the application fee is waived, the
applicant must still pay engineering and inspection fees and expenses; however, such fees and expenses
shall not be duplicative of any engineering or inspection fees paid in connection with plat or certified
survey map approval.
B. Minor. The application fee for a minor land -disturbing activity permit shall be an amount set by the
Village in the annual fee schedule resolution, of which a portion will cover administration and
inspections, and the remainder will be a deposit, which is refundable unless violations occur and have
to be taken care of by the Village.
C. Village activity. No permit or fees are required for Village activity.
D. The permit fee shall be payable at the time an application for either an erosion control or a stormwater
management permit, or both, is submitted.
§ 163-16. Enforcement.
A. Stop-work order.
(1) Whenever the Village Agent finds any noncompliance with the provisions of this chapter, the
Village Agent shall attempt to communicate with the owner or person performing the work to
obtain immediate and voluntary compliance if such person is readily avail able. If the owner or
person performing the work is not readily available, that person refuses to voluntarily comply
immediately or the noncompliance presents an imminent danger or will cause or threatens to
cause bodily injury or damage to off -site property, including, but not limited to off -site runoff,
the Village Agent shall post in a conspicuous place on the premises, a stop -work order which
shall cause all activity not necessary to correct the noncompliance to cease until noncompliance
is corrected.
(2) The stop -work order shall provide the following information: date of issuance, an adequate
identification of the property subject to the stop-work order, reason for posting and the signature
of the inspector posting the card.
(3) It shall be a violation of the chapter for the unauthorized removal of the stop -work order from
the premises.
B. In addition to posting a stop-work order, the Village Agent shall provide notification to the owner or
contractor by personal service, written notice by certified mail, or facsimile transmission.
(1) The permittee, landowner and contractor shall have 24 hours from the time and date of
notification by the Village Agent to correct any noncompliance with the plan when notification
is by either personal communication of noncompliance to the owner or contractor or their
respective agents or written notice sent by certified mail to the owner or contractor.
(2) If notice is not provided under Subsection B(1) the permittee and landowner shall have
72 hours to correct any noncompliance with the plan when notification is by posting
notice in a conspicuous place on the site or sending notice by facsimile transmission to
owner or contractor.
C. If any noncompliance is not corrected within the time periods specified in Subsection B(1) or
(2), the permittee and landowner authorize the Village Agent to take any action, to perform
any work, or commence any operations necessary to correct conditions upon the subject
property where notice of noncompliance has been issued to bring the property into
conformance with plan requirements. The permittee and landowner further consent to
reimburse the authority for the total costs and expenses of the aforementioned actions ; said
reimbursement may be collected as a special charge upon the property for current services
rendered as provided by law.
D. If the permittee has filed an appeal under § 163-14A prior to the expiration of the time for
compliance under § 163-16B, the Village Agent may take action, perform work or correct
conditions only to the extent necessary to protect against or correct an imminent hazard or a
condition that will cause or threatens to cause personal injury or damage to off-site property.
E. Revocation of permit. Where a stop-work order has been issued in order to obtain compliance
with a control plan and the permittee does not cease the illegal activity or obtain compliance
with the control plan or permit conditions within the time period specified in Subsection B(1)
or (2), the Village may revoke the permit issuance of the stop -work order. Permits for major
land-disturbing activities may be revoked by the Village Engineer or his designee; permits for
minor land-disturbing activities may be revoked by the Erosion Control Officer, Building
Inspector or Village Engineer.
F. Private remedies preserved. These enforcement provisions are not intended in any way to
restrict or limit the rights of private parties to pursue whatever private legal remedies they
may have available as a result of any erosion, sediment or water runoff.
§ 163-17. Violations and penalties.
A. Any person or persons, firm, company or corporation, owner, occupant or other user of the
premises who violates, disobeys, omits, neglects or refuses to comply with or resists the
enforcement of any of the provisions of this chapter shall be subject to a forfeiture of not
less than $200 nor more than
$2,000 plus the actual costs of prosecution for each offense for major land -disturbing
activities, and not less than $50 nor more than $500, plus the actual costs of prosecutions of
each offense, for minor land -disturbing activities. Each day that a violation exists shall
constitute a separate offense.
B. Any person who has the ability to pay any forfeiture entered against him or her under this
chapter but refuses to do so may be confined in the county jail until such forfeiture is paid,
but in no event to exceed 30 days. In determining whether an individual has the ability to pay
a forfeiture, all items of income and all assets may be considered regardless of whether or not
such income or assets are subject to garnishment, lien or attachment by creditors.
C. As a substitute for or as an addition to forfeiture actions under Subsection A or corrective action
under
§ 163-16C, the Village Attorney is authorized to seek enforcement of any part of this chapter
by court action seeking injunctive relief. It shall not be necessary for the Village Attorney to
take corrective action or prosecute for forfeiture before resorting to injunctive relief.
§ 163-18. Technical Standards and Specifications.
The design of all best management practices designed to meet the requirements of this chapter shall
comply with the following technical standards:
A. Natural Resources Conservation Service’s “Wisconsin Field Office Technical Guide, Chapter
4” or its successor.
B. Applicable construction or erosion control standards established by the Wisconsin Department
of Natural Resources or State of Wisconsin.
C. Any other technical methodology established by Dane County.
§ 163-19. Interpretation. The interpretation and application of this chapter shall be interpreted and
liberally construed in the favor of the Village, and nothing in this chapter will be construed as a
limitation or repeal of any power granted by Wisconsin law.
§ 163-20. Severability. If any portion of this chapter is ruled unenforceable or invalid by a court, the
remainder of this chapter shall not be rendered invalid, ineffective, or unenforceable.
Village of Cottage Grove, WI
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
Chapter 163
EROSION, SEDIMENT AND WATER RUNOFF CONTROL
§ 163-1. General provisions.
§ 163-2. Definitions.
§ 163-3. Scope of geographic coverage;
exclusions.
§ 163-4. Technical standards and
specifications.
§ 163-5. Applicability of requirement
for erosion control permits.
§ 163-6. Applicability of requirement
for stormwater control permits.
§ 163-7. Exemptions and clarifications.
§ 163-8. Preliminary review letter.
§ 163-9. Erosion control and stormwater
control permits and
administration.
§ 163-10. Erosion control plan
requirements.
§ 163-11. Stormwater management plan
requirements.
§ 163-12. Regulations for lands or
activities not otherwise subject
to this chapter.
§ 163-13. Off-site stormwater
management.
§ 163-14. Appeals; variances.
§ 163-15. Permit fees.
§ 163-16. Enforcement.
§ 163-17. Violations and penalties.
[HISTORY: Adopted by the Village Board of the Village of Cottage Grove 2-21-2011 by Ord. No.
02-2011;
1 amended in its entirety 5-16-2016 by Ord. No. 02-2016. Subsequent amendments noted
where applicable.]
GENERAL REFERENCES
Comprehensive Master Plan — See Ch. 23.
Building construction and fire prevention — See Ch. 130.
Illicit discharge detection and elimination — See Ch. 164.
Floodplain zoning — See Ch. 183.
Subdivision of land — See Ch. 274.
Water and sewers — See Ch. 312.
Wellhead protection — See Ch. 317.
Zoning — See Ch. 325.
§ 163-1. General provisions.
A. Authority. This chapter is adopted under the author ity granted by ss. 61.34(1) , 61.35, 61.354, 62.23
and 236.45, Wisconsin Statutes.
B. Legislative findings.
(1) The Village Board of the Village of Cottage Gr ove finds that construction site erosion and
uncontrolled stormwater runoff from land-dis turbing and land development activities have
significant adverse impacts upon regional water re sources and the health, safety, property and
general welfare of the community, and dimini sh the public enjoyment and use of natural
1. Editor’s Note: This ordinance also repealed former Ch. 163, Erosion, Sediment and Water Runoff Control, adopted 8-19-2002 by
Village of Cottage Grove, WI
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
Ord. No. 15-2002, as amended in its entirety 7-17-2006 by Ord. No. 06-2006.
Village of Cottage Grove, WI
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
§ 163-1 COTTAGE GROVE CODE § 163-1
resources. Specifically, soil erosion and stormwater runoff can:
(a) Carry sediment, nutrients, pa thogens, organic matter, heavy metals, toxins and other
pollutants to regional lakes, streams and wetlands;
(b) Diminish the capacity of water resources to support recreational and water supply uses and
a natural diversity of plant and animal life;
(c) Clog existing drainage systems, increasing maintenance problems and costs;
(d) Cause bank and channel erosion;
(e) Increase downstream flooding;
(f) Reduce groundwater rech arge, which may diminish stream base flows and lower water
levels in regional lakes, ponds and wetlands;
(g) Contaminate drinking water supplies;
(h) Increase risk of property damage and personal injury; and
(i) Cause damage to agricultural fields and crops.
(2) The Village Board of the Village of Cottage Grove also finds that effective sediment and
stormwater management depends on proper pl anning, design, and timely installation of
conservation and management practices and their continuing maintenance.
C. Purpose and intent.
(1) The purpose of this chapter is to set forth the minimum requirements for construction site erosion
control and stormwater management that will dimi nish threats to public health, safety, public
and private property and natural resources of Village of Cottage Grove.
(2) This chapter is intended to regulate constr uction site erosion and stormwater runoff, to
accomplish the following objectives:
(a) Promote regional stormwater management by watershed;
(b) Minimize flooding, sedimentation, water pollution from nutrients, heavy metals, chemical
and petroleum products and other contaminants, flooding, and thermal impacts to the water
resources of Cottage Grove;
(c) Promote infiltration and groundwater recharge;
(d) Protect functional values of natural watercourses and wetlands;
(e) Provide a set of performance standards that are consistent with the standards set forth by
Dane County and the Wisconsin Department of Natural Resources' runoff management
standards contained in NR 151;
(f) Achieve reductions in sediment and phosphorus load development in approved TMDL
studies, and achieve a twenty-percent reduction in sediment load rates compared to no
controls for existing developments;
(g) Ensure no increase in the flow rate of surface water drainage from sites during or after
construction; and
Village of Cottage Grove, WI
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
§ 163-1 EROSION, SEDIMENT AND WATER RUNOFF § 163-2
(h) Protect public and private property from damage resulting from runoff or erosion.
(h)(i) Ensure no increase in temperature of stormw ater post-development to protect cold water
communities.
D. Abrogation and greater restrictions. It is not intended by this chapter to repeal, abrogate, annul, impair
or interfere with any existing easements, covenants, deed restrictions, agreements, rules, regulations,
ordinances or permits previously a dopted or issued pursuant to law. However, wherever this chapter
imposes greater restrictions, the provisions of this chapter shall govern.
E. Interpretation. In their interpretation and application, the provisions of this chapter shall be held to be
the minimum requirements and shall not be deemed a limitation or repeal of any other power granted
by the Wisconsin Statutes. Where any terms or requirements of this chapter may be inconsistent or
conflicting, the more restrictive requirement or interpretation shall control.
F. Effective date. This chapter shall become effect ive immediately upon publication and posting. After
that date, all land-disturbing activities shall be in compliance with all provisions of this chapter.
§ 163-2. Definitions.
The following terms, wherever they appear in this chapter, are defined as follows:
AFFECTED — That a regulated activity has significantly:
A. Caused negative impacts on water quality or the use or maintenance of one's property or business; or
B. Endangered one's health, safety, or general welfare.
AGRICULTURAL — Related to or used for the production of food and fiber, including, but not limited to,
general farming, livestock and poul try enterprises, grazing, nurseries , horticulture, viticulture, truck
farming, forestry, sod production, cranberry producti ons and wild crop harvesting. Clearing and grubbing
of an area or structural development are not agricultural activity.
AVERAGE ANNUAL RAINFALL — Measured precipitation in Madison, Wisconsin, between March 12
and December 2, 1981.
BANK EROSION — The removal of soil or rock fragm ents along the banks or bed of a stream channel
resulting from high flow after rain events.
BASIN — The total area drained by a waterway as desi gnated by the Village Engineer or the total area
drained by any of the waterway's tributaries, exclusive of any other drainage area.
BMP or BEST MANAGEMENT PRACTICE — A practice, technique, or measure that is an effective,
practical means of preventing or reducing soil erosion or water pollution, or both, from runoff both during
and after land development activities. These can include structural, vegetative or operational practices.
CLOSED WATERSHED — An area that does not have a su rface outlet, with water only able to leave through
evaporaton, infiltration, or mechanical means. Examples of a closed watershed include, but are not limited to:
A. Internally drained watersheds that are at least 20,000 square feet in area and at least 1 foot in depth
from invert to lowest surface outlet.
B. Watersheds with no surface outlet discharges from a 2-year, 24 hour design storm.
C. Areas that have historically not drained through surface outlets, as determined by the Village.
COMMERCIAL — For the retail or whol esale sale of goods or services.
CONNECTED IMPERVIOUSNESS — An impervious surface that is directly connected to a separate
storm sewer or water of the state via an impervious flow path.
CONSTRUCTION SITE EROSION CONTROL — Preventing or reducing soil erosion and sedimentation
Formatted: Not Expanded by / Condensed by
Formatted: Numbered + Level: 1 + Numbering Style:
A, B, C, … + Start at: 1 + Alignment: Left + Aligned at:
0.5" + Indent at: 0.75"
Village of Cottage Grove, WI
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
from land-disturbing activity.
CONTROL PLAN — An erosion control plan required by § 163-5 or a stormwater management plan
required by § 163-6.
DESIGN STORM — A hypothetical rainstorm that occurs with a specified recurrence interval in the Village.
For example, a 10-year, 24 hour design storm defines a rainstorm that occurs over 24 hours, with a recurrence
interval of 10 years. The amounts associated with these storms are further defined as follows:
A. 1-year 24-hour design storm is 2.49 inches over 24 hours using MSE4 NRCS rainfall distribution.
B. 2 year, 24-hour design storm is 2.84 inches over 24 hours using MSE4 NRCS rainfall distribution.
C. 10-year, 24-hour design storm is 4.09 inches over 24 hours using MSE4 NRCS rainfall distribution.
D. 100-year, 24-hour design storm is 6.66 inches over 24 hours using the MSE4 NRCS rainfall distribution.
E. 200-year, 24-hour design storm is 7.53 inches over 24 hours using the MSE4 NRCS rainfall distribution.
F. 500-year, 24-hour design storm is 8.94 inches over 24 hours using the MSE4 NRCS rainfall distribution.
DEVELOPMENT — Any of the following activities:
A. Construction of a new building or other structure;
B. Expansion or alteration of an existing structure that results in an increase in the ground surface
dimensions of the building or structure;
C. Land disturbing activity; or
D. Creation of expansion of impervious surfaces.
DIRECT CONDUITS TO GROUNDWATER — Wells, sinkholes, swallets, fractured bedrock at the surface,
mine shafts, none-metallic mines, tile inlets discharging to groundwater, quarries, or depressional
groundwater recharge areas over shallow fractured bedrock.
DIRECTOR — The Director of Public Works or designee.
EASEMENT — An interest in land owned by another th at creates a non-possessory right to enter and use the
property of another for specific purposes.
EASEMENT HOLDER —The holder or beneficiary of an easement that authorizes the activity on the land
for the permit sought under this chapter.
EFFECTIVE INFILTRATION AREA — The area of the infiltration system that is used to infiltrate runoff and
does not include the area used for site access, berms or pretreatment.
EROSION (SOIL EROSION) — The detachment and moveme nt of soil or rock fragments by water, wind,
Formatted: Numbered + Level: 1 + Numbering Style:
A, B, C, … + Start at: 1 + Alignment: Left + Aligned at:
0.25" + Indent at: 0.5"
Formatted: Left, Right: 0", Space Before: 5.9 pt
Village of Cottage Grove, WI
§ 163-2 COTTAGE GROVE CODE § 163-2
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
ice or gravity.
EXCAVATION — Any act by which organic matter, earth, sand, gravel, rock or any other similar material
is cut into, dug, quarried, uncovered, removed, disp laced, relocated or bulldozed and shall include the
resulting conditions.
EXISTING DEVELOPMENT — Buildings and other stru ctures and impervious area existing prior to
August 22, 2001.
FILL — Any act by which earth, sand, gravel, rock or any other material is deposited, placed, replaced,
pushed, dumped, pulled, transported, or moved to a new location and shall include the resulting conditions.
GREEN INFRASTRUCTURE — Practices that use plant or soil systems, permeable pavement or other
permeable surfaces or substrates, stormwater harvest a nd reuse, or landscaping to store, infiltrate, or
evaportanspirate stormwater and reduce flows to sewer systems or to surface waters. Green infrastructure
includes, but is not limited to, the following practices: rainwater harvesting/reuse, rain gardens, bioretention
systems, infiltration basins, planters that are conne cted to roof drainage, ve getated swales, permeable
pavement, green roofs, and rain barrels.
GRADING — Altering the elevation of the land surface by stripping, excavating, filling, stockpiling of soil
materials or any combination thereof and shall include the land from which the material was taken or upon
which it was placed.
GULLY EROSION — A severe loss of soil caused by or resulting in concentrated flow of sufficient
velocity to create a defined flow channel.
HEAVILY DISTURBED SITE — A site where an area of land is subjected to significant compaction due
to the removal of vegetative cover or earthmoving activities, including filling.
HYDROLOGIC SOIL GROUP (HSG) — Has the meaning used in the runoff calculation methodology
promulgated by the United States Natural Resources Conservation Service Engineering Field Manual for
Conservation Practices.
IMPERVIOUS SURFACE — Any land cover that preven ts rain or melting snow from soaking into
the ground, such as roofs (including overhangs), road s, sidewalks, patios, driveways and parking lots.
For purposes of this chapter, all road, driveway or parking surfaces, including gravel surfaces, shall be
considered impervious, unless specifically designed to encourage infiltration and approved by the local
approval authority.
INFILTRATION —
A. Refers to any precipitation that does not leave the site as surface runoff. Also known as “stay on.”
B. The process by which rainfall or runoff seeps into the soil.
INFILTRATION SYSTEM — A device or practice such as a basin, trench, rain garden or swale designed
specifically to encourage infiltration, but does not include natural infiltration in pervious surfaces such as
lawns, redirecting of rooftop downspouts onto lawns or minimal infiltration from practices such as swales
or road side channels designed for conveyance and pollutant removal only.
KARST FEATURE — An area or surficial geologic feature subject to bedrock dissolution so that it is likely
to provide a conduit to groundwater, and may include caves, enlarged fractures, mine features, exposed
bedrock surfaces, sinkholes, springs, seeps or swallets.
LAND-DISTURBING ACTIVITIES — Any la nd alterations or disturbances that may result in soil erosion,
sedimentation, or change in runoff, including bu t not limited to removal of ground cover, grading,
excavating, and filling of land.
LANDOWNER — Any person holding title to or having an ownership interest in land.
LIGHTLY DISTURBED SITE — A site where an area of land is subjected to minor compaction due to the
Village of Cottage Grove, WI
§ 163-2 COTTAGE GROVE CODE § 163-2
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
limited removal of vegetative cover or earthmoving activities.
LOCAL LAND DIVISION ORDINANCE — Any county, city, Village or town ordinance adopted under
Chapter 236, Wis. Stats., to regulate the division of land.
Village of Cottage Grove, WI
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
§ 163-2 EROSION, SEDIMENT AND WATER RUNOFF § 163-2
MAJOR LAND-DISTURBING ACTIVITIES — Those activities where:
A. The land disturbance exceeds 20,000 square feet in area; or
B. The slope of the land exceeds 6%; or
C. The Village Engineer determines that special circumstances due to topography, proximity to
watercourses or relation to sensitive environmental areas make the disturbance a major one.
MAXIMUM EXTENT PRACTICABLE (MEP) — A level of implementing best management practices in
order to achieve a performance standard specified in this chapter which takes into account the best available
technology, cost effectiveness and other competing is sues such as human safety and welfare, endangered
and threatened resources, historic properties and geographic features. MEP allows flexibility in the way to
meet performance standards and may vary based on the performance standard and site conditions.
MINOR LAND-DISTURBING ACTIVITIES — Those activities where:
A. The land disturbance does not exceed 20,000 square feet in area; and
B. The slope of the land does not exceed 6% throughout the site.
NEW DEVELOPMENT — Any of the following activities:
A. Structural development, including construction of a new building or other structures;
B. Expansion or alteration of an existing structure that results in an increase in the surface dimensions of the
building or structure;
C. Land-disturbing activities; or
D. Creation or expansion of impervious surface.Development that results in the cumulative increase of 20,000
square feet of impervious surface to a site since August 21, 2001. New development can also include
redevelopment.
NONEROSIVE VELOCITY — A rate of flow of stormwat er runoff, usually measured in feet per second,
that does not erode soils. Nonerosi ve velocities vary for individual sites, taking into account topography,
soil type, and runoff rates.
PEAK FLOW — The maximum rate of flow of water at a given point in a channel, watercourse, or conduit
resulting from the predetermined storm or flood.
PERSON — Any individual, corporation, partnership, joint venture, agency, unincorporated association,
municipal corporation, county, or state agency w ithin Wisconsin, the federal government, or any
combination thereof.
PERVIOUS SURFACE — Any land cover that permits rain or melting snow to soak into the ground.
PERMITTEE — A landowner, easement holder, or deve loper who has applied fo r a permit under this
Chapter and is responsible for the requirements of the permit.
POST-DEVELOPMENT — Refers to the extent and distri bution of land cover types anticipated to occur
under conditions of full development of the submitted plan. This term is used to match pre- and post-
development stormwater peak flows as required by the chapter.
PREDEVELOPMENT — Refers to the extent and dist ribution of land cover types present before the
initiation of the proposed of land development activity, assuming that all land uses prior to land-disturbing
activity are in "good" condition as described in th e Natural Resources Conser vation Service Technical
Release 55, "Urban Hydrology for Small Watersheds" (c ommonly known as TR-55). This term is used to
match pre- and post-development stormwater peak flows as required by the chapter. In a situation where
the cumulative impervious surface created after August 21, 2001, exceeds the twenty-thousand-square-foot
threshold, the predevelopment conditions shall be those prior to the proposed land disturbance.
Formatted: Body Text, Indent: Left: 0.25", Space
Before: 6.35 pt, No bullets or numbering, Tab stops:
Not at 0.58"
Village of Cottage Grove, WI
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
PROTECTIVE AREA — An area of land that commences at the top of the channel of lakes, streams
Village of Cottage Grove, WI
§ 163-2 COTTAGE GROVE CODE § 163-2
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
and rivers, or at the delineated boundary of wetlands , and extends horizontally for the width specified
in § 163-11B(7)(a) from the top of the channel or de lineated wetland boundary to the closest impervious
surface. In this chapter, "protective area" does not include any area of land adjacent to any stream enclosed
within a pipe or culvert, such that runoff cannot enter the enclosure at this location.
RECHARGE — The portion of the average annual rainfall that infiltrates the soil and becomes
groundwater. Recharge does not include evaporation, transpiration, or runoff from the site.
REDEVELOPMENT — Any construction, alteration or improvement exceeding 4,000 square feet of land
disturbance performed on sites wh ere the existing site is predominantly developed as commercial,
industrial, institutional or multifamily residential us es. Projects may include a mix of redevelopment and
new impervious surfaces. New impervious surfaces added as a result of redevelopment are subject to
§ 163-6A.
RUNOFF CURVE NUMBER (RCN) — Has the meaning used in the runoff calculation methodology
promulgated by the United States Natural Resources Conservation Service Engineering Field Manual for
Conservation Practices.
SEDIMENT — Solid earth material, both mineral and organic, that is in suspension, is being transported,
or has been moved from its site of origin by air, wate r, gravity or ice, and has come to rest on the earth's
surface at a different site.
SEDIMENTATION — The deposition of eroded soils at a site different from th e one where the erosion
occurred.
SHEET AND RILL EROSION — A loss of soil caused by sheet flow or shallow concentrated flow, and
characterized by an absence of channeling or a relatively uniform loss across the exposed upper layer of the
soil or shallow irregular scouring of the soil surface.
SITE — The bounded area described in an erosion control plan or stormwater management plan.
SLOPE — The net vertical rise over horizontal run, expressed as a percentage, which represents a relatively
homogeneous surface incline or decline over the area disturbed.
SOIL LOSS RATE — The rate, usually measured in tons per acre per year, at wh ich soil is transported
beyond the perimeter of a given control site and which occurs as a result of sheet and rill erosion. This term
does not apply to soil movement resulting from concentrated flow such as gully or bank erosion.
STORM EVENTS — The precipitation amounts that oc cur over a twenty-four-hour period that have a
specified recurrence interval for Dane County, Wisconsin. For example, one-, two-, ten-, and one-hundred-
year storm events mean the precipitation amounts that occur over a twenty-four-hour period that have a
recurrence interval of one, two, 10, and 100 years, respectively.
STORMWATER — The flow of water which results from, and which occurs during and immediately
following, a rainfall, snow- or ice-melt event.
STORMWATER MANAGEMENT — Any measures taken to permanently reduce, or minimize the
negative impacts of stormwater runoff quantity and quality after land development activities.
STORMWATER RUNOFF — The waters derived from ra ins falling or snowmelt or ice melt occurring
within a drainage area, flowing over the surface of the ground and/or collected in channels, watercourses
or conduits.
STREET RECONSTRUCTION — Removal and replacem ent of the road subgrade, where existing
stormwater conveyance systems are modified.
STRUCTURE — Any human-made object with form, shape and utility, either permanently or temporarily
attached to, placed upon, or set into the ground, stream bed or lake bed.
SUB-BASIN — A subdivision of a basin all of which drains to a single identifiable location.
Village of Cottage Grove, WI
§ 163-2 EROSION, SEDIMENT AND WATER RUNOFF § 163-5
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
TMDL or TOTAL MAXIMUM DAILY LOAD — The amount of pollutants specified as a function of one
or more water quality parameters that can be discharged per day into a water quality limited segment and
still ensure attainment of the applicable water quality standard. The USEPA and WDNR approved report
"Total Maximum Daily Loads for Total Phosphorus and Total Suspended Solids in the Rock River Basin"
dated July 2011 specifies an annual percent reductio n for pollutants necessary to meet the wasteload
allocations assigned to the Village of Cottage Grove.
UNNECESSARY HARDSHIP — That circumstance where special conditions, which were not self-
created, affect a particular property and make strict conformity with regulations unnecessarily burdensome
or unreasonable in light of the purposes of this chapter.
VILLAGE — The Village of Cottage Grove.
VILLAGE AGENT — The Erosion Control Officer, th e Village Engineer, the Building Inspector or
any other Village employee or official assigned or charged with the responsibility of administering and
enforcing the requirements of this chapter or any inde pendent contractor retained by the Village for such
purpose.
VILLAGE ENGINEER — The individual, or the individu al's designee, or the firm, or a representative
of the firm, appointed or retained by the Village Bo ard to routinely provide en gineering services for the
Village.
§ 163-3. Scope of geographi c coverage; exclusions.
A. Within the Village. Unless specifically excluded herein, this chapter applies to all land-disturbing and
land developing activities occurring within the corporate limits of the Village.
B. Within the extraterritorial area. This chapter shall apply outside the Village limits within the
extraterritorial plat review area provided by Chapter 236, Wis. Stats., but only to those land-disturbing
activities relating to, arising from, or connected wi th a subdivision as defined in s. 236.02, Wis.
Stats.(12)
§ 163-4. Technical standa rds and specifications.
The design of all best management practices designed to meet the requirements of this chapter shall comply
with the following technical standards:
A. Natural Resources Conservation Service's "Wisconsin's Field Office Technical Guide, Chapter 4;" or
its successor;
B. Applicable construction erosion control standa rds by the Wisconsin Department of Natural
Resources;
C. Any other technical methodology approved by the Dane County Conservationist.
§ 163-5. Applicability of requirem ent for erosion control permits.
Unless expressly exempted by § 163-7, an erosion cont rol permit under § 163-9 shall be required and all
construction site erosion control provisions of this chapter shall apply, to any of the following activities in
Village of Cottage Grove;
A. Land-disturbing activity in excess of 4,000 square feet;
B. Land-disturbing activity on a slope of greater than 12%;
Village of Cottage Grove, WI
§ 163-5 COTTAGE GROVE CODE § 163-7
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
C. Land-disturbing activity that involves the excavatio n or filling, or a combination of excavation and
filling, in excess of 400 cubic yards of material;
D. Land-disturbing activity that disturbs more than 100 lineal feet of road ditch, grass waterway or other
land area where surface drainage flows in a defined open channel; including the placement, repair or
removal of any underground pipe, utility or other facility within the cross-section of the channel;
E. Any new public or private roads or access drives longer than 125 feet;
F. Development that requires a subdivision plat, as defined in the applicable local land division
ordinance(s);
G. Land-disturbing activity that disturbs less than 4,000 square feet of land, including the installation of
access drives, that the local approval authority determines to have a high risk of soil erosion or water
pollution, or that may significantly impact a lake, stream, or wetland area. Examples of activities with
a high risk of soil erosion or water pollution may include, but are not limited to, land disturbance on
erodible soil or disturbance adjacent to lakes, rivers, streams or wetlands. All such determinations
made by the local approval authority shall be in writing, unless waived by applicant.
§ 163-6. Applicability of requirement for stormwater control permits.
Unless otherwise exempted by § 163-7, a stormwater control permit under § 163-9 shall be required and all
stormwater management provisions of this chapter shall apply to any of the following activities within the
Village of Cottage Grove:
A. Any development(s) after August 22, 2001, that result(s) in the cumulative addition of 20,000 square
feet of impervious surface to the site;
B. Agricultural development that creates new imperv ious surface area exceeding 20,000 square feet on
the site;
C. Any development that requires a subdivision plat, as defined in applicable local land division
ordinance(s);
D. Any development that requires a certified survey map, as defined in the applicable local land division
ordinance(s); for property intended for commercial or industrial use;
E. Redevelopment, as defined in § 163-2.
F. Other land development activities, including but not limited to redevelopment or alteration of existing
buildings and other structures, that the local approval authority determines may significantly increase
downstream runoff volumes, flooding, soil eros ion, water pollution or property damage, or
significantly impact a lake, stream, or wetland area. All such determinations shall be made in writing
unless waived by the applicant.
§ 163-7. Exemptions and clarifications.
A. Any activity directly related to the planting, growi ng and harvesting of agricultural crops is exempt
from all requirements of this chapter;
B. The following activities are exempt from the construction site erosion control provisions of § 163-5:
(1) One- and two-family dwelling units regulated under the Wisconsin Uniform Dwelling Code.
Land-disturbing activities in excess of one acre, or not associated with the construction of a
Village of Cottage Grove, WI
§ 163-7 EROSION, SEDIMENT AND WATER RUNOFF § 163-8
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
dwelling, are not exempt from this chapter.
(2) Projects specifically exempted from local eros ion control ordinances under state or federal
statute. It is the responsibility of the landowner to demonstrate such exemption with
documentation acceptable to the local approval authority.
(3) Municipal road or county highway project not exempted under § 163-7B(2) are exempt from
§ 163-11B(3) and (4) where all of the following conditions are met:
(a) The purpose of the project is only to meet current state or federal design or safety
guidelines;
(b) All activity takes place within existing public right-of-way;
(c) All other requirements of § 163-11 are met; and
(d) The project does not include the addition of new driving lanes.
C. The following activities are exempt from the infiltration standards described in § 163-11B(6):
(1) Redevelopment sites.
(2) New development sites with less than ten-percent-connected imperviousness based on complete
development of the post-construction site, provided the cumulative area of all impervious surface
is less than one acre.
(3) Agricultural facilities and practices.
(4) Areas where the infiltration rate of the soil is less than 0.6 inch/hour measured at the bottom of
the proposed infiltration system where the soil layer is not easily removed or manipulated.
(5) Expansion of Parking areas and access roads le ss than 5,000 square feet for commercial and
industrial development.
(6)(5) Rrooads in commercial, industrial and institutional land uses, and arterial roads.
D. The following activities are exempt from the protective area requirements described in § 163-11B(7):
(1) Redevelopment sites;
(2) In-fill development areas of less than five acres;
(3) Structures that cross or access surface waters, such as boat landings, bridges and culverts;
(4) Structures constructed in accordance with s. 59.692(1v), Wis. Stats.; and
(5) Post-construction sites from which runoff does no t enter the surface water, except to the extent
that vegetative ground cover is necessary to maintain bank stability.
§ 163-8. Preliminary review letter.
A. A preliminary review letter provides a potential perm it applicant with an initial simple evaluation of
whether erosion and stormwater control standards can be met for a proposed site, lot layout, and/or
construction design. This review is intended to assi st applicants in preparing general site plans and
other submittals necessary to obtain an erosion control and stormwater permit. A preliminary review
Village of Cottage Grove, WI
§ 163-8 COTTAGE GROVE CODE § 163-9
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
letter does not guarantee that an erosion or stormwater control plan will be approved or that a permit
will be issued. Erosion and stormwater control plans and permit applications must meet all applicable
standards and criteria for approval.
B. A preliminary review letter shall be required fo r all activities requiring an erosion control or
stormwater management permit under §§ 163-5 and 163-6.
C. Application requirements.
(1) A preliminary review letter must be submitted to and approved by the Village Engineer before
an erosion control or stormwater management permit application may be submitted.
(2) The following materials must be included in the preliminary review letter:
(a) A narrative describing the proposed project.
(b) A map showing the following information:
[1] Location of the proposed project;
[2] Limits of disturbed area;
[3] Limits of impervious area;
[4] Drainage area for each watershed area; and
[5] Location and description of proposed stormwater facilities.
(c) Preliminary runoff calculations which clearly demonstrate the adequacy of the proposed
facilities and land that will be dedicated to stormwater management for meeting the
standards of this chapter.
D. Approval process.
(1) The Village Engineer shall review the letter and determine whether erosion and stormwater
control standards can be met for a proposed site, lot layout, and/or construction design.
(2) Within 15 days of receiving the preliminary review letter, the Village Engineer shall either
approve the preliminary plan or notify the applicant of any deficiencies.
(3) The Village Engineer shall notify the applicant in writing of any deficiency in the preliminary
plan and the applicant shall be given an opportunity to correct any deficiency.
(4) Approval of a preliminary review letter does not guarantee that an erosion or stormwater control
plan will be approved or that a permit will be issued. Erosion and stormwater control plans and
permit applications must meet all applicable standards and criteria for approval.
§ 163-9. Erosion control and stormwater control permits and administration.
A. No activity meeting the criteria described in §§ 163-5 and 163-6 shall occur and no zoning permit
may be issued until an erosion control and stormwater control permit is issued by the Village.
B. The applicant must provide the following when requesting a permit:
(1) Completed application form:
Village of Cottage Grove, WI
§ 163-9 EROSION, SEDIMENT AND WATER RUNOFF § 163-9
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
(a) The application must be signed by the landowner, easement holder, or include a notarized
statement signed by the landowner or easement holder authorizing the applicant to act as
the landowner's or easement holder’s agent and bind the landowner to the terms of this
chapter.
(b) If a landowner or easement holder appoints an agent to submit an application pursuant to
Subsection B(1) (a), the landowner or easement holder shall be bound by all of the
requirements of this chapter and the terms of any permit issued to the agent. If the applicant
is an easement holder or an agent of an ea sement holder, the applicant must provide the
landowner notice and a copy of the permit application and all supporting documentation.
The Village will provide the landowner with copies of all permits and notifications issued
regarding permit applications.
(2) Fees as required by § 163-15.
(3) Copy of preliminary review letter, as described in § 163-8.
(4) If required by § 163-5, an erosion control plan meeting all the standards of § 163-10A and C, or
a simplified checklist as described in § 163-10B.
(5) If required by § 163-6, a stormwater management plan meeting all of the standards of § 163-11
and a draft maintenance agreement as described in § 163-11A(8).
(6) Copies of permits or permit applications or approvals required by any other governmental entity.
(7) A proposed timetable and schedule for completion and installation of all elements of approved
erosion control and stormwater management plan s and a detailed schedule for completion of
construction.
(8) An estimate of the cost of completion and installation of all elements of the approved erosion
control and stormwater management plans.
(9) Evidence of financial responsibility to complete the work proposed in the plan. For major land-
disturbing activities, the applicant shall provide, prior to issuance of the permit, an irrevocable
letter of credit, certificate of deposit or certified check to the Village in an amount equal to 125%
of the estimated cost of all required control measures as determined by the Village Engineer.
The security deposited shall guarantee that all required control measures will be taken or
installed according to the approved plan. The security shall remain in full force until released by
the Village Board, and only after an inspection by the Village Engineer assures that all required
control measures have been fully and satisfactorily completed. The Village shall have the right
to draw upon the security for purposes of obtaining compliance with the approved control plan
as it deems necessary. If the erosion and runoff control requirements of this chapter are included
as part of plat or certified survey map condition s of approval, then, security for performance of
the control requirements may be included as part of the overall security required for installation
of improvements under Chapters 23, 274 and 325 of the Village Ordinances.
C. Approval process.
(1) Major land-disturbing activities.
(a) The Village Engineer shall verify that the permit application is complete under § 163-9B
and review the plan(s) for compliance with the standards identified in §§ 163-10 and 163-
11. The Village may request additional informa tion at any time to determine ordinance
compliance.
(b) The Village Engineer shall eith er approve the submitted plan or notify the applicant in
Village of Cottage Grove, WI
§ 163-9 EROSION, SEDIMENT AND WATER RUNOFF § 163-9
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
writing of any deficiencies, within 30 days of receipt of the control plan. Staff engaged in
this review and approval process shall be ce rtified where appropriate by the Wisconsin
Department of Safety and Professional Services for this purpose.
Village of Cottage Grove, WI
§ 163-9 COTTAGE GROVE CODE § 163-9
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
(2) Minor land-disturbing activities.
(a) The Village Agent shall verify the permit application is complete under § 163-9B and
review the plan for compliance with this chapter in accordance with the Erosion Control
Checklist attached hereto and incorporated herein as Exhibit A
2 established by the Village
Engineer and approved by the Village Board. The Village may request additional
information at any time to determine ordinance compliance.
(b) The Village Agent shall approve, reject or conditionally approve the plan within the same
number of working days as required for issuance of a building permit, but in no event more
than three working days after receipt of the completed control plan statement. If the control
plan statement is rejected or conditionally approved, the applicant shall be informed, in
writing, of the reasons for rejection or conditions of approval. Staff engaged in this review
and approval process shall be certified where appropriate by the Wisconsin Department of
Safety and Professional Services for this purpose.
(3) Where installed stormwater practices will be pr ivately owned, an affidavit which describes the
property by legal description, notifying future prospective purchasers of the existence of a
stormwater permit (which is on file at Village Hall) issued under this chapter and applicable
plan, timetables and potential liability imposed by § 163-16C for failure to bring the property
into compliance with this chapter after notificat ion, shall be recorded with the Dane County
Register of Deeds prior to issuance of an erosion and stormwater control permit. The foregoing
information shall also be noted on every plat and certified survey map.
(4) Upon approval of the Village Engineer, the erosion control or stormwater management permit
shall be issued by the Village after the applicant has met all other requirements of this chapter.
D. Permit conditions.
(1) The plan shall be implemented prior to the start of any land-disturbing activity and shall be
maintained over the duration of the project. Stormwater components of the plan shall be
maintained in perpetuity.
(2) The permittee is responsible for successful completion of the erosion control plan and the
stormwater management plan. The permittee shall be liable for all costs incurred, including
environmental restoration costs, resulting from noncompliance with an approved plan.
(3) Application for a permit shall constitute express permission by the permittee and landowner for
the Village Agent to enter the property for purposes of inspection under Subsection E or curative
action under § 163-16C. The application form contains a prominent provision advising the
applicant and landowner of this requirement.
(4) All incidental mud-tracking off site onto adjace nt public thoroughfares shall be cleaned up and
removed by the end of each working day using proper disposal methods.
(5) A copy of the approved permit and erosion control plan shall be kept on the project site, in a
place readily accessible to contractors, engineers, local approval authority inspection staff and
other authorized personnel.
E. Inspections.
(1) Application for a permit under this chapter shall constitute permission by the applicant and
2. Editor's Note: Said exhibit is on file in the Village offices.
Village of Cottage Grove, WI
§ 163-9 EROSION, SEDIMENT AND WATER RUNOFF § 163-
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
landowner for the Village Agent to enter upon the property and inspect during the construction
phase prior to the inspections pursuant to Subs ection E(4) and (6), as necessary to confirm
compliance with the requirements of this chapter.
(2) As part of the plan approval process, the Village Agent shall determine the minimum number of
inspections required to assure compliance. The site of any regulated land-disturbing activity shall
be inspected once every 30 days, or more frequently as determined by the Village Engineer during
the construction phase with assistance from th e Erosion Control Officer and/or Building
Inspector. The Village Agent's compliance inspections do not relieve the permittee from
performing and documenting their own inspections required by ch. NR 151, Wis. Adm. Code.
(3) Within 10 days after installation of all practic es in an approved erosion control plan and
achievement of soil stabilization, the permittee shall notify the Village Clerk and Erosion Control
Officer. The permittee shall inspect the site weekly and prior to every forecasted rain fall of ½
inch or greater.
(4) The Village Agent shall inspect the property to verify compliance with the erosion control plan
within 10 days of notification of soil stabilization.
(5) Within 10 days after installation of all practices in an approved stormwater management plan,
the permittee shall notify the Village Clerk and submit drawings documenting construction. The
person who designed the stormwater management plan for the permittee shall submit as-built
certification to ensure that constructed st ormwater management practices and conveyance
systems comply with the specifications included in the approved plans. At minimum, as-built
certification shall include a set of drawings comparing the approved stormwater management
plan with what was constructed. Other information shall be submitted as required by the Village
Engineer, Building Inspector, or Erosion Control Officer.
(6) The Village Agent shall inspect the property to verify compliance within 10 days of notification.
(7) Maintenance is the responsibility of the owner, and facilities are subject to inspection and orders
for repairs.
F. Permit transfers.
(1) The affidavit [required in § 163-9C(3)] describing the property by legal description and notifying
future prospective purchasers of the existence and responsibilities associated with the stormwater
permit on file at Village Hall runs with the property.
(2) The permittee may not transfer interest in property subject to an approved plan prior to
completion of the proposed steps to attain soil stabilization without Village approval.
(2)(3) When a permittee and landowner transfers owners hip, possession or control of real estate
subject to either or both an uncompleted erosion control or stormwater management plan, the
successor in interest to any portion of the real es tate shall be responsible to control soil erosion
and runoff and shall comply with the minimum standards provided in this chapter.
(3)(4) When ownership, possession or control of proper ty subject to an uncompleted erosion control
or stormwater management plan, or both, is tran sferred, the former owner (seller) shall notify
the new owner (buyer) as to the current status of compliance with notice to the authority, and
provide a copy of the erosion control plan or stormwater management plan, or both.
(4)(5) Transfers of interest in real estate subject to an approved, uncompleted plan may be conducted
consistent with this chapter under any of the following arrangements:
(a) The transferee shall file a new, approved erosion control or stormwater management plan,
Village of Cottage Grove, WI
§ 163-9 EROSION, SEDIMENT AND WATER RUNOFF § 163-
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
or both, with the authority;
Village of Cottage Grove, WI
§ 163-9 COTTAGE GROVE CODE § 163-11
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
(b) The transferee shall obtain an approved assignment from the authority as sub-permittee to
complete that portion of the approved plan regulating soil erosion and runoff on the
transferee's property.
(c) The permittee shall provide the authority with a duly completed and executed continuing
surety bond or certified check in an amount sufficient to complete the work proposed in
the approved plan; at the time of transfer, the permittee may seek to reduce the surety bond
or certified check to the appropriate amount to complete remaining work. If the transferor
enters into escrow agreements with transferees to complete an approved plan, these funds
shall be available to the authority to attain plan compliance. When an approved erosion
control plan and, if required, a stormwater management plan is or are not completed as
proposed, the authority may use the surety bond to complete remaining work to achieve
plan compliance.
G. Plan or permit amendments. Any proposed modificati ons to approved plans, construction schedules
or alterations to accepted sequencing of land-disturbing site activities shall be approved by the Village
Engineer in consultation with the Erosion C ontrol Officer or Building Inspector prior to
implementation of said changes. One permit revision is allowed at no charge. The second and
subsequent revisions, to a maximum of five revisions, cost $50 each.
H. Timeframe and Expiration.
(1) Erosion control plan construction must begin wi thin one year from date of filing a complete
application.
(2) Except as otherwise specified, all permit applications will expire the sooner of:
(a) One year after the applicant is notified of, but does not adequately address, a deficiency; or
(b) Three years from date of filing a complete application.
(3) Erosion control permits will expire the sooner of:
(a) Upon the stabilization date in the approved plan; or
G.(b) three years after permit issuance.
§ 163-10. Erosion control plan requirements.
A. The erosion control plan shall meet the more stringent requirements between those identified in this
chapter and those identified in the most current version of Dane County erosion control ordinance
requirements.
A.B. Plan materials. Erosion control plans required under § 163-5 may include consideration of adjoining
landowners' cooperative efforts to control transport of sediment and, except as specifically exempted
below, shall include at a minimum the following information:
(1) Property lines, lot dimensions, and limits of disturbed area, including areas within five (5) feet of the
property line;
(2) Limits of impervious area, including buildings. Include all public and private roads, interior
roads, driveways and parking lots, and indicate type of paving and surface material;
(3) All natural and artificial water features includi ng, but not limited to, lakes, ponds, streams
(including intermittent streams), and ditches; and areas of natural woodland or prairie. The plan
must show ordinary high-water marks of all navigable waters, one-hundred-year flood elevation
and delineated wetland boundaries. A certifi ed flood zone determination and/or wetland
Formatted
Village of Cottage Grove, WI
§ 163-9 COTTAGE GROVE CODE § 163-12
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
delineation may be required at the applicant's expense;
(4) Cross sections of and profiles of channels, swales and road ditches;
(5) Culvert sizes;
(6) Direction of flow of runoff;
(7) Watershed size for each drainage area;
(8) Design discharge for ditches and structural measures;
(9) Runoff velocities;
(10) Fertilizer and seeding rates and recommendations;
(11) Time schedules for stabilization of ditches and slopes;
(12) Description of methods by which sites are to be developed and a detailed land disturbance
(12)
Village of Cottage Grove, WI
§ 163-10 EROSION, SEDIMENT AND WATER RUNOFF § 163-10
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
schedule including time schedules for stabilization of ditches and slopes;
(13) Provision for sequential steps mitigating erosive effect of land-disturbing activities to be
followed in appropriate order and in a manner consistent with accepted erosion control
methodology suitable to proposed sites and amenable to prompt revegetation, including runoff
calculations as appropriate;
(14) Provisions to prevent mud-tracking off site on to public thoroughfares during the construction
period;
(15) Provisions to prevent the discharge of sediment from dewatering activities;
(16) Provisions to disconnect impervious surfaces, where feasible;
(17) Provisions to prevent sediment delivery to, and accumulation in, any proposed or existing
stormwater conveyance systems (both on-site and off-site);
(18) Copies of permits or permit applications required by any other unit of government or agency;
(19) Existing and proposed elevations (referenced to the North American Vertical Datum of 1988)
and existing and proposed contours in the area, where deemed necessary.
(20) Any other information necessary to reasonably determine the location, nature and condition of
any physical or environmental features of the site;
(21) Provisions to prevent the transport by runoff of chemicals, cement and other building compounds
and materials on the construction site during the construction period;.
(21)(22) Areas of natural woodland or prairie.
B.C. Simplified plan checklist. For minor land-disturbing activities, as defined in § 163-2, applicants may
submit erosion control proposals using simplified checklists of standard erosion control practices, on
a standard form established by the Village Engineer and approved by the Village Board and a simple
map and site development schedule. Simplified plan checklists shall be reviewed by the Village Agent
for completeness and accuracy.
C.D. Erosion control performance standards.
(1) Proposed design, suggested location and phased implementation of effective, practicable erosion
control measures for plans shal l be designed, engineered and implemented to achieve the
following results:
(a) Prevent gully and bank erosion;
(b) Limit total off-site permissible annual aggregate soil loss for exposed areas resulting from
sheet and rill erosion to an annual, cumulative soil loss rate not to exceed five tons per acre
annually; and
(c) Discharges from new construction sites must have a stable outlet capable of carrying
designed flow as required in § 163-11B(4), at a nonerosive velocity. Outlet design must
consider flow capacity and flow duration. This requirement applies to both the site outlet
and the ultimate outlet to stormwater conveyance or waterbody.
(d) Prevent or reduce all of the following:
1. The depositing of soil from being tracked onto streets by vehicles.
2. The discharge of sediment from disturbed areas into on-site storm water inlets.
Village of Cottage Grove, WI
§ 163-10 EROSION, SEDIMENT AND WATER RUNOFF § 163-11
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
3. The discharge of sediment from disturbed ar eas into adjacent waters of the State of
Wisconsin.
4. The discharge of sediment from drainage ways that flow off the site.
5. The discharge of sediment by dewatering activities.
6. The discharge of sediment eroding from soil stockpiles existing for more than 7 days.
(c)7. The transport by runoff chemicals, cement, and other building compounds and
materials on a construction site during construction.
(2) Plan compliance under Subsection C(1) shall be determined using the Wisconsin Department of
Natural Resources' Construction Site Soil Loss and Sediment Discharge Calculation Guidance
(effective June 2015 or current version), or another commonly accepted soil erosion
Formatted: Numbered + Level: 1 + Numbering Style:
1, 2, 3, … + Start at: 1 + Alignment: Left + Aligned at:
1.25" + Indent at: 1.5"
Village of Cottage Grove, WI
§ 163-10 COTTAGE GROVE CODE § 163-12
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
methodology approved by the Dane County Conservationist, that considers season of year, site
characteristics, soil erodibility and slope.
(3) Erosion control measures for plan approval need not attempt to regulate soil transportation
within the boundaries of the applicant's site.
(4) Implementation. Permittees shall implement BMPS as follows:
(a) Erosion and sediment control practices shall be constructed or installed before land
disturbing activities begin.
(b) Erosion and sediment control practices must be maintained until final stabilization.
(c) Final s activity shall commence when land disturbing activity ceases and final grade has
been reached on any portion of the site.
(d) Temporary stabilization activity shall commence when land disturbing activity has
temporarily ceased and will not resume for a period exceeding 14 calendar days.
(e) BMPs that are no longer necessary for erosion and sediment control must be removed.
(5) Grading within (5) feet of property line. Except as authorized in this section, the topography
within five (5) feet of any property line shall remain unchanged during development.
(a) When land disturbing activity associated with development occurs within five (5) feet of
any property line, finished grades in that ar ea shall be restored to the topography in
existence before the land disturbing activity began. A positive slope of one-half (1/2) inch
vertical per one (1) foot horizontal within five (5) feet of the property line is allowed to
provide proper drainage away from a one or two family residence.
(b) The established grade of the adjoining property shall determine the finished grade at the
property line for any development. The owner of the property under development bears the
burden of proof as to the established grade at the property line and the topography within
five (5) feet of the property line.
(c) Existing drainage ways and drainage easements along property lines shall be maintained
including, but not limited to, natural watercourses and stormwater management areas
shown on plats and certified survey maps.
(d) Development in Floodplain Districts requiring fill to comply with Village ordinances is
exempt from this subsection.
(e) The director may authorize grading resulting in changes to the existing topography at and
within five (5) feet of any property line, if the applicant establishes the following:
1. The intent of the grading and an explanation of its necessity, and
2. Stormwater runoff will not negatively affect adjacent properties.
(3)
§ 163-11. Stormwater management plan requirements.
A. Any stormwater management plan must meet th e more stringent requirements between those
identified in this Chapter and those identified in the most current Dane County requirements.
A.B. Plan materials. Stormwater management plans shall satisfy all of the requirements in Subsection B,
and shall address at a minimum the following information:
Formatted: Indent: Left: 1.97", No bullets or
numbering
Formatted: Indent: Left: 1.25", No bullets or
numbering
Village of Cottage Grove, WI
§ 163-10 COTTAGE GROVE CODE § 163-13
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
(1) A narrative describing the proposed project, including implementation schedule for planned
practices;
(2) Identification of the entity responsible for long-term maintenance of the project;
(3) A map showing drainage areas for each watershed area;
(4) A summary of runoff peak flow rate calculations, by watershed area, including:
(a) Preexisting peak flow rates;
(b) Post-construction peak flow rates with no detention;
(c) Post-construction peak flow rates with detention;
(d) Assumed runoff curve numbers (RCNs); and
(e) Time of concentration (Tc) used in calculations.
(5) A complete site plan and specifications, sign ed by the person who designed the plan. All plans
shall be drawn to an easily legible scale, shall be clearly labeled, and shall include, at a minimum,
all of the following information:
(a) Property lines and lot dimensions;
(b) All buildings and outdoor uses, existing and proposed, including all dimensions and
setbacks;
(c) All public and private roads, interior roads, driveways and parking lots. Show traffic
patterns and type of paving and surfacing material;
(d) All natural and artificial water features, including, but not limited to, lakes, ponds, streams
(including intermittent streams), and ditches. Show ordinary high-water marks of all
navigable waters, one-hundred-year flood elevations and delineated wetland boundaries, if
any. If not available, appropriate flood zone determination or wetland delineation, or both,
may be required at the applicant's expense;
(e) Protective areas as defined in Subsection B(7)(a);
(f) Depth to bedrock;
(g) Depth to seasonal high-water table;
(h) The extent and location of all soil types as described in the Dane County Soil Survey,
Village of Cottage Grove, WI
§ 163-11 EROSION, SEDIMENT AND WATER RUNOFF § 163-11
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
slopes exceeding 12%, and areas of natural woodland or prairie;
(i) Existing and proposed elevations (referenced to the North American Vertical Datum of
1988, where available) and existing and proposed contours in the area requiring a grading
and filling permit;
(j) Elevations, sections, profiles, and details as needed to describe all natural and artificial
features of the project;
(k) Soil erosion control and overland runoff control measures, including runoff calculations as
appropriate;
(l) Detailed construction schedule;
(m) Copies of permits or permit applications requ ired by any other governmental entities or
agencies;
(n) Any other information necessary to reasonably determine the location, nature and condition
of any physical or environmental features;
(o) Location of all stormwater management practices;
(p) All existing and proposed drainage features;
(q) The location and area of all proposed impervious surfaces; and
(r) The limits and area of the disturbed area.
(6) Engineered designs for all structural management practices;
(7) A description of methods to control oil and grease or written justification for not providing such
control;
(8) A maintenance plan and schedule for all perm anent stormwater management practices as
recorded on the affidavit required in § 163-9C(3).
(9) If necessary, a description and plans to control temperature of runoff.
(10) A summary of infiltration calculations including:
(a) Pre-development infiltration volume.
(b) Calculated infiltration volume goal.
(c) Achieved post-development infiltration volume.
(8)(11) Flood elevation for a 200-year design storm and proposed minimum opening elevation.
B.C. Stormwater management performance standards. Proposed de sign, suggested location and phased
implementation of effective, practicable stormwater management measures for plans shall be
designed, engineered and implemented to achieve the following results:
(1) Sediment control.
(a) For new development, design practices to retain soil particles greater than five microns on
the site resulting from a one-year twenty-fou r-hour storm event (2.5 inches over twenty-
four-hour duration), according to approve d procedures, and assuming no sediment
resuspension; or design practices to achieve an eighty-percent reduction in sediment loads
based on average annual rainfall.*
Village of Cottage Grove, WI
§ 163-11 EROSION, SEDIMENT AND WATER RUNOFF § 163-11
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
[1] For new development, design practices to achieve a fifty-four-percent reduction in
total phosphorus loads based on average annual rainfall.
(b) For redevelopment resulting in exposed surface parking lots and associated traffic areas,
design practices to achieve th e following reductions in sedi ment loads based on average
annual rainfall: 55% for sites within the Ko shkonong watershed, and 62% for sites within
the Yahara watershed.
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
Village of Cottage Grove, WI
§ 163-11 COTTAGE GROVE CODE § 163-11
[1] For redevelopment resulting in exposed surface parking lots and associated traffic
areas, design practices to achieve a 54% reduction in total phosphorus loads based on
average annual rainfall.
[2] Under no circumstances shall the site's existing sediment or phosphorus control level
or trapping efficiency be reduced as a result of the redevelopment.
[3] Note: the 80% reduction based on average annual rainfall standard and the five-
micron particle trapping standard are considered generally equivalent.
(2) Oil and grease control. For all stormwater plans for commercial or industrial developments and
all other uses where the potential for pollution by oil or grease, or both, exists, the first 0.5 inch
of runoff will be treated using the best oil and grease removal technology available. This
requirement may be waived by the plan reviewer only when the applicant can demonstrate that
installation of such practices is not necessary.
(3) Runoff rate control, hydrologic calculations. A ll runoff calculations shall be according to the
methodology described in the Na tural Resources Conservation Service's Technical Release 55,
"Urban Hydrology for Small Watersheds" (commonly known as TR-55), or other methodology
approved by the Dane County Conservationist. The maximum runoff curve number (RCN) used
in such calculation shall be the TR-55 specified curve numbers for other land uses shall be used
for predevelopment conditions. For post-development conditions, heavily disturbed sites will be
lowered one permeability class for hydrologic cal culations. Lightly disturbed areas require no
modification. Where practices have been implemented to restore soil structure to predeveloped
conditions, no permeability class modification is required.
Table 1 - Maximum Predevelopment Runoff Curve Numbers
Runoff Curve Number Hydrologic Soil Group*
A B C D
Woodland 30 55 70 77
Grassland 39 61 71 78
Cropland 51 68 78 83
NOTE:
* When dual HSGs are specified, the drained condition shall be assumed.
(4) Runoff rate control, design standards. Hydrologic analyses shall utilize the MSE4 NRCS rainfall
distribution. Except for redevelopment projects, all stormwater facilities shall be designed,
installed and maintained to effectively accomplish the following:
(a) Maintain predevelopment peak runoff rates for the one-year, twenty-four-hour storm event
(2.49 inches over 24 hours' duration).
(b) Maintain predevelopment peak runoff rates for the two-year, twenty-four-hour storm event
(2.84 inches over 24 hours' duration).
(c) Maintain predevelopment peak runoff rates for the ten-year, twenty-four-hour storm event
(4.09 inches over 24 hours' duration).
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
Village of Cottage Grove, WI
§ 163-11 EROSION, SEDIMENT AND WATER RUNOFF § 163-11
(d) Maintain predevelopment peak runoff rates for the one-h undred-year, twenty-four-hour
storm event (6.66 inches over 24 hours' duration).
(d)(e) Maintain predevelopment peak runoff rates fo r a two-hundred year, twenty four hour
storm event (7.53 inches over 24 hours’ duration).
(5) Outlets. Discharges from new construction sites must have a stable outlet capable of carrying
designed flow as required in Subsection B(4), at a nonerosive velocity. Outlet design must
consider flow capacity and flow duration. This requirement applies to both the site outlet and the
ultimate outlet to stormwater conveyance or water body.
(6) Infiltration.
(a) For both residential and nonresidential deve lopments, design practices to infiltrate
sufficient runoff volume so that post-development infiltration volume shall be at least 90%
of pre-development infiltration volume, based on average annual rainfall.
(b) If, when designing appropriate infiltration systems, more than 2% of the site is required to
be used as effective infiltration area, the applicant may alternately design infiltration
systems and pervious surfaces to meet or exceed the annual predevelopment recharge rate.
The annual predevelopment recharge rate shall be determined from the Wisconsin
Geological and Natural History Survey's 2009 Report, Groundwater Recharge in Dane
County, Estimated by a GIS-Based Water-Balance d Model, or subsequent updates to this
report, or by a site-specific analysis using other appropriate techniques. If this alternative
design approach is taken, at least 2% of the site must be used for infiltration.
(c) Pretreatment. Before infiltrating runoff, pret reatment shall be required for parking lot
runoff and for runoff from new road construction in commercial, industrial and institutional
areas that will enter an infiltration system. The pretreatment shall conform to the design
standards in section 163-4 and be designed to protect the infiltration system from clogging
prior to scheduled maintenance and to protect groundwater quality.
(d) Separation distances. Infiltration practices shall be located so that the characteristics of the
soil and the separation distance between the bottom of the infiltration system and the
elevation of seasonal high groundwater or the top of competent bedrock are shown in Table
2.
Table 2
Source Area Separation Distance Soil Characteristics
Industrial, Commercial,
Institutional, Parking
Lots, and Roads
5 feet or more Filtering layer
Residential arterial roads 5 feet or more Filtering layer
Roofs draining to
subsurface infiltration
practices
1 foot or more Native or engineered soil
with particles finer than
coarse sand
Roofs draining to surface
infiltration practices
Not applicable Not applicable
All other impervious
source areas
5 feet or more Filtering layer
Formatted: Indent: Left: 1.25", No bullets or
numbering
Formatted: Centered, Indent: Left: 1.25", No bullets
or numbering
Formatted: No bullets or numbering
Formatted: No bullets or numbering
Formatted: No bullets or numbering
Formatted: No bullets or numbering
Formatted: No bullets or numbering
Formatted: No bullets or numbering
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
(c)
(d)(e) Prohibitions. Notwithstanding Subsection B(6)(a) through (c), infiltration systems may
not be installed in any of the following areas:
[1] Areas associated with Tier 1 industrial facilities identified in s. NR 216.21(2)(a), Wis.
Admin. Code, including storage, loading, rooftop and parking.
[2] Storage and loading areas of Tier 2 indus trial facilities identified in s. NR
216.21(2)(b). Wis. Admin. Code.
[3] Fueling and vehicle maintenance areas.
[4] Areas within 1,000 feet up gradient or within 100 feet down gradient of karst features
or direct conduits to groundwater.
[5] Areas with less than three feet separation distance from bottom of the infiltration
system to the elevation of seasonal high groundwater or the top of bedrock, except
that this provision does not prohibit infiltration of roof runoff.
[6] Areas with runoff from industrial, commercial and institutional parking lots and roads
and residential arterial roads with less than five feet separation distance from the
bottom of the infiltration system to the elevation of seasonal high groundwater or the
top of bedrock.
[7] Areas within 400 feet of a community water system well as specified in s. NR
Formatted: Indent: Left: 1.25", No bullets or
numbering
Village of Cottage Grove, WI
§ 163-11 COTTAGE GROVE CODE § 163-11
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
811.16(4), Wis. Admin. Code, for runoff infiltrated from commercial, industrial and
institutional land uses or regional devices for residential development.
[8] Areas where contaminants of concern, as defined in s. NR 720.03(2), Wis. Admin.
Code, are present in the soil through which infiltration will occur.
[9] Any area where the soil does not exhibit one of the following characteristics between
the bottom of the infiltration system and the seasonal high groundwater and top of
bedrock: at least a five-foot soil layer with 10% fines or greater. This provision does
not apply where the soil medium within the infiltration system provides an equivalent
level of protection and does not prohibit infiltration of roof runoff.
(e)(f) Alternate use of runoff. Where alternate uses of runoff are employed, such as flushing,
laundry or irrigation, such alternate use shall be given equal credit toward the infiltration
volume required by this section.
(g) Minimizing groundwater pollution. According to ch. NR 151, Wis. Admin. Code,
infiltration systems designed in accordance with this section shall, to the extent technically
and economically feasible, minimize the level of pollutants infiltrating to groundwater and
shall maintain compliance with the preventive action limit at a point of standards
application in accordance with ch. NR 140, Wi s. Admin. Code. Howeve r, if site-specific
information indicates that compliance with th e preventive action limit is not achievable,
the infiltration system may be not installed or shall be modified to prevent infiltration to
the maximum extent practicable.
(f)(h) The maximum pre-development runoff curve nu mber (RCN) used in such calculations
shall be those shown in Table 1.
(7) Protective areas.
(a) All sites, except those exempted under § 163-7D, shall be designed to maintain a protective
area of the following minimum protective area widths:
[1] For outstanding resource waters and exceptional resource waters, and for wetlands in
areas of special natural resource interest as specified in s. NR 103.04, 75 feet.
[2] For perennial and intermittent streams identified on a United States geological survey
7.5-minute series topographic map, or a co unty soil survey map, whichever is more
current, 50 feet.
[3] For lakes, 50 feet.
[4] For highly susceptible wetlands, 50 feet. Highly susceptible wetlands include the
following types: fens, sedge meadows, bogs, low prairies, conifer swamps, shrub
swamps, other forested wetlands, fresh wet meadows, shallow marshes, deep marshes
and seasonally flooded basins. Wetland bound ary delineations shall be made in
accordance with s. NR 103.08(1m). This subsection does not apply to wetlands that
have been completely filled in accordanc e with all applicable state and federal
regulations. The protective area for wetlands that have been partially filled in
accordance with all applicable state and federal regulations shall be measured from
the wetland boundary delineation after fill has been placed.
[5] For less susceptible wetlands, 10% of the average wetland width, but no less than 10
feet, nor more than 30 feet. Less susceptible wetlands include degraded wetlands
dominated by invasive species such as reed canary grass; cultivated hydric soils; and
any gravel pits, dredged material or fill material disposal sites that take on the
Village of Cottage Grove, WI
§ 163-11 EROSION, SEDIMENT AND WATER RUNOFF § 163-12
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
attributes of a wetland.
[6] For concentrated flow channels with drainage areas greater than 130 acres, 10 feet.
[7] In Subsection B(7)(a)[1], [4] and [5], determinations of the extent of the protective
area adjacent to wetlands shall be made on the basis of the sensitivity and runoff
susceptibility of the wetland in accordance with the standards and criteria in s. NR
103.03, Wis. Adm. Code.
(b) The following requirements shall be met in protective areas:
[1] Impervious surfaces shall be kept out of the protective area to the maximum extent
practicable. The stormwater management plan shall contain a written site-specific
explanation for any parts of the protective area that are disturbed during construction.
[2] Where land-disturbing construction activity occurs within a protective area, and
where no impervious surface is present, ad equate sod or self-sustaining vegetative
cover of 70% or greater shall be established and maintained. The adequate sod or self-
sustaining vegetative cover shall be su fficient to provide for bank stability,
maintenance of fish habitat and filtering of pollutants from upslope overland flow
areas under sheet flow conditions. Nonvegetative materials, such as rock riprap, may
be employed on the bank as necessary to prev ent erosion, such as on steep slopes or
where high velocity flows occur.
[3] Best management practices, such as filter strips, swales, or wet detention basins, that
are designed to control pollutants from nonpoint sources may be located in the
protective area.
C.D. Stormwater management goals. The following standards shall be met whenever possible, and
proposed design, suggested location and implementatio n of practices to meet these goals shall be
included in plans:
(1) For existing development, design practices to retain soil particles greater than 40 microns on the
site (twenty-percent reduction) resulting fro m a one-year twenty-four-hour storm event,
according to approved procedures, and assuming no sediment resuspension.
(2) For street reconstruction, design practices to retain soil particles greater than 20 microns on the
site (forty-percent reduction) resulting from a one-year, twenty-four-hour storm event, according
to approved procedures, and assuming no sediment resuspension.
D.E. Control measures. All water runoff control measures shall require approval of the Village Engineer.
Control measures may include, but are not limited to, infiltration basins, detention ponds, and swales.
In addition to the following technical standards referred to in § 163-4, control measures installed
within the Village must be designed and constructed according to the following standards:
(1) All slopes shall be at least 4:1 or flatter (four feet horizontal to one foot vertical).
§ 163-12. Regulations for lands or activities not otherwise subject to this chapter.
Notwithstanding any other provisions of this chapter, it shall be a violation of this chapter for any person to
create, permit, establish, maintain or allow to be maintained any condition or activity that causes excessive
runoff or erosion to adjacent land, public streets or water bodies. Penalties and remedies may be sought for
such activities as provided in § 163-17. Erosion and runoff is excessive when in the opinion of the
Village of Cottage Grove, WI
§ 163-12 COTTAGE GROVE CODE § 163-14
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
Village Engineer or Building Inspector an unsafe cond ition results in the streets, sedimentation occurs in
lakes and streams, environmentally sensitive lands are threatened, runoff endangers downstream property,
or the public health, safety or gene ral welfare of the citizens of the Village of Cottage Grove is otherwise
threatened or harmed.
§ 163-13. Off-site st ormwater management.
A. When the Village Board determines, based on a drainage study conducted and prepared by a qualified
professional engineer, that off-site water runoff control measures best serve the interests of the public
and the environment, then the Board may allow or require off-site water runoff control as a condition
of approval of a land disturbance pe rmit. When off-site water runoff co ntrol is permitted or required
as specified in § 163-11B(4), prio r to final approval by the Board, the permit applicant shall obtain
written permission from any and all property owne rs who would experience increases in the amount
of water runoff entering their land from a two-, a ten-, or a one-hundred-year, twenty-four-hour design
storm or whose property is threatened by virtue of additional soil saturation. The Village Board will
act on behalf of any and all affe cted public lands, public drainageways, storm sewers or other public
waterways.
B. Developments served by off-site stormwater manageme nt facilities will be charged a fee-in-lieu of
detention. Fees-in-lieu will be set by the Village and based on the level of service provided to the
applicant by the off-site facility.
C. Off-site stormwater management is only allowed when all of the following conditions for the off-site
facility are met:
(1) The facility is in place;
(2) The facility is designed and adequately sized to provide a level of stormwater control that at
least meets the ordinance standards;
(3) The facility has a legally obligated entity responsible for its long-term operation and
maintenance.
D. Permit applicants may be required to install and maintain temporary facilities designed to meet the
standards of this chapter, if an off-site facility that will serve the proposed development is planned but
does not yet meet the conditions of Subsection C. Temporary facilities must be maintained by the
applicant until that time that the off-site facility meets the conditions of Subsection C. Applicants
required to install and maintain temporary facilities will also be charged a fee-in-lieu.
§ 163-14. Appeals; variances.
A. Appeals.
(1) Any person aggrieved by any decision of the Village Agent pursuant to this chapter may appeal
to the Zoning Board of Appeals. Such appeal shall be taken within 30 days after the challenged
decision. Notice of appeal setting forth the specific grounds for the appeal shall be filed with the
Village Clerk. A fee of an amount set by the Village in the annual fee schedule resolution must
accompany any appeal request involving a land-disturbing activity. The Zoning Administrator
shall forthwith transmit to the Zoning Board of Appeals the record upon which the action
appealed from was taken.
(2) The Zoning Board of Appeals shall publish a Class 2 notice thereof under ch. 985, Wis. Stats.,
Village of Cottage Grove, WI
§ 163-14 EROSION, SEDIMENT AND WATER RUNOFF § 163-15
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
as well as give due notice to the parties in interest. The Board shall hear and decide variance and
appeal requests within 30 days of receipt of written request and payment of the appeal fee. Upon
the hearing any party may appear in person or by agent or attorney.
(3) The Zoning Board of Appeals may, in conformity with the provisions of this chapter, reverse or
affirm, wholly or partly, or mo dify the order, requirement, deci sion or determination appealed
from and may make such order, requirement decision or determination as ought to be made, and
shall have all the powers of the officer from whom the appeal is taken.
(4) The concurring vote of a majority of the Zoning Board of Appeals shall be necessary to reverse
the decision of the Village Engineer.
B. Variances.
(1) An applicant may include in the application a re quest for a variance from the requirements of
§ 163-10 or § 163-11. No variance shall be gr anted unless the applicant demonstrates and the
Village Engineer, in consultation with the Zoning Administrator, finds that all of the following
conditions are present:
(a) Enforcement of the standards set forth in this chapter will result in unnecessary hardship
to the landowner;
(b) The hardship is due to exceptional physical conditions unique to the property;
(c) Granting the variance will not adversely affect th e public health, safety or welfare, nor be
contrary to the spirit, purpose and intent of this chapter;
(d) The project will have no impact upon any of the stated purposes of this chapter as set forth
in § 163-1C;
(e) The applicant has proposed an alternative to the requirement from which the variance is
sought that will provide equivalent protection of the public health, safety and welfare, the
environment and public and private property;
(f) The net cumulative effect of the variance will not impact downstream conditions; and
(g) Existing regional facilities are shown to meet the performance standards of this chapter.
(2) If all of the conditions set forth in Subsection B(1) are met, a variance may only be granted to
the minimum extent necessary to afford relief from the unnecessary hardship, with primary
consideration to water quality.
(3) A variance from the provisions of § 163-11B(1) and (2) may only be granted if:
(a) The applicant has met the requirements of § 163-14B(1); and
(b) The applicant will be denied all reasonable and beneficial use of the property if the variance
is denied.
(4) A person aggrieved by a vari ance determination by the Village Engineer and/or Zoning
Administrator may appeal the decision to the Zoning Board of Appeals pursuant to Subsection
B(1).
(5) A person aggrieved by a decision of the Zoni ng Board of Appeals regarding a variance may
appeal that decision to Dane County Circuit Court.
Village of Cottage Grove, WI
§ 163-15 COTTAGE GROVE CODE § 163-16
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
§ 163-15. Permit fees.
A. Major. The application fee for a major land-disturbing activity permit shall be an amount set by
Village in the annual fee schedule resolution, of which a portion will cover administration and
inspections, and the remainder will be a deposit which is refundable unless violations occur and have
to be taken care of by the Village. In addition to this fee, before any permit will be issued, the applicant
must pay the actual engineering fees or expenses incurred by the Village in connection with review of
the control plan and the engineering fees or expenses estimated to be incurred for on-site inspection
during the project. Where plat or certified survey map review fees are paid pursuant to Chapters 23,
274 and 325 of the Village Ordinances for the same project covered by the proposed land-disturbing
activity permit, then the application fee will be waived. Where the application fee is waived, the
applicant must still pay engineering and inspection fees and expenses; however, such fees and expenses
shall not be duplicative of any engineering or inspection fees paid in connection with plat or certified
survey map approval.
B. Minor. The application fee for a minor land-disturbing activity permit shall be an amount set by the
Village in the annual fee schedule resolution, of which a portion will cover administration and
inspections, and the remainder will be a deposit, which is refundable unless violations occur and have
to be taken care of by the Village.
C. Village activity. No permit or fees are required for Village activity.
D. The permit fee shall be payable at the time an application for either an erosion control or a stormwater
management permit, or both, is submitted.
§ 163-16. Enforcement.
A. Stop-work order.
(1) Whenever the Village Agent finds any noncompliance with the provisions of this chapter, the
Village Agent shall attempt to communicate with the owner or person performing the work to
obtain immediate and voluntary compliance if such person is readily available. If the owner or
person performing the work is not readily availabl e, that person refuses to voluntarily comply
immediately or the noncompliance presents an im minent danger or will cause or threatens to
cause bodily injury or damage to off-site proper ty, including, but not lim ited to off-site runoff,
the Village Agent shall post in a conspicuous pl ace on the premises, a stop-work order which
shall cause all activity not necessary to correct the noncompliance to cease until noncompliance
is corrected.
(2) The stop-work order shall provide the following information: date of issuance, an adequate
identification of the property subject to the stop-work order, reason for posting and the signature
of the inspector posting the card.
(3) It shall be a violation of the chapter for the un authorized removal of the stop-work order from
the premises.
B. In addition to posting a stop-work order, the Village Agent shall provide notification to the owner or
contractor by personal service, written notice by certified mail, or facsimile transmission.
(1) The permittee, landowner and c ontractor shall have 24 hours from the time and date of
notification by the Village Agent to correct any noncompliance with the plan when notification
is by either personal communication of noncomp liance to the owner or contractor or their
Village of Cottage Grove, WI
§ 163-16 EROSION, SEDIMENT AND WATER RUNOFF § 163-17
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
respective agents or written notice sent by certified mail to the owner or contractor.
(2) If notice is not provided under Subsection B(1) the permittee and landowner shall have 72 hours
to correct any noncompliance with the plan when notification is by posting notice in a
conspicuous place on the site or sending notice by facsimile transmission to owner or contractor.
C. If any noncompliance is not corrected within the time periods specified in Subsection B(1) or (2), the
permittee and landowner authorize the Village Agent to take any action, to perform any work, or
commence any operations necessary to correct c onditions upon the subject property where notice of
noncompliance has been issued to bring the property into conformance with plan requirements. The
permittee and landowner further consent to reimburse the authority for the total costs and expenses of
the aforementioned actions; said reimbursement may be collected as a special charge upon the
property for current services rendered as provided by law.
D. If the permittee has filed an appeal under § 163-14A prior to the expiration of the time for compliance
under § 163-16B, the Village Agent may take action, perform work or correct conditions only to the
extent necessary to protect agains t or correct an imminent hazard or a condition that will cause or
threatens to cause personal injury or damage to off-site property.
E. Revocation of permit. Where a stop-work order has been issued in order to obtain compliance with a
control plan and the permittee does not cease the illegal activity or obtain compliance with the control
plan or permit conditions within the time period sp ecified in Subsection B(1) or (2), the Village may
revoke the permit issuance of the stop-work order. Permits for major land-disturbing activities may
be revoked by the Village Engineer or his design ee; permits for minor land-disturbing activities may
be revoked by the Erosion Control Officer, Building Inspector or Village Engineer.
F. Private remedies preserved. These enforcement provisions are not intended in any way to restrict or
limit the rights of private parties to pursue whatev er private legal remedies they may have available
as a result of any erosion, sediment or water runoff.
§ 163-17. Violations and penalties.
A. Any person or persons, firm, company or corporation, owner, occupant or other user of the premises
who violates, disobeys, omits, neglects or refuses to comply with or resists the enforcement of any of
the provisions of this chapter shall be subject to a forfeiture of not less than $200 nor more than
$2,000 plus the actual costs of prosecution for each offense for major land-disturbing activities, and
not less than $50 nor more than $500, plus the actual costs of prosecutions of each offense, for minor
land-disturbing activities. Each day that a violation exists shall constitute a separate offense.
B. Any person who has the ability to pay any forfeiture entered against him or her under this chapter but
refuses to do so may be confined in the county jail until such forfeiture is paid, but in no event to
exceed 30 days. In determining whether an individual has the ability to pay a forfeiture, all items of
income and all assets may be considered regardless of whether or not such income or assets are subject
to garnishment, lien or attachment by creditors.
C. As a substitute for or as an addition to forfeiture actions under Subsection A or corrective action under
§ 163-16C, the Village Attorney is authorized to seek enforcement of any part of this chapter by court
action seeking injunctive relief. It shall not be necessary for the Village Attorney to take corrective
action or prosecute for forfeiture before resorting to injunctive relief.
§ 163-18. Technical Standards and Specifications.
The design of all best management practices designed to meet the requirements of this chapter shall comply
with the following technical standards:
Formatted: Font: Bold
Formatted: Indent: First line: 0.5"
Formatted: Indent: Left: 0.25"
Village of Cottage Grove, WI
§ 163-16 EROSION, SEDIMENT AND WATER RUNOFF § 163-17
Downloaded from https://ecode360.com/CO1851 on 2026-08-21
A. Natural Resources Conservation Service’s “Wisconsin Field Office Technical Guide, Chapter 4” or its
successor.
B. Applicable construction or erosion control standards established by the Wisconsin Department of
Natural Resources or State of Wisconsin.
C. Any other technical methodology established by Dane County.
§ 163-19. Interpretation. The interpretation and application of this chapter shall be interpreted and liberally
construed in the favor of the Village, and nothing in this chapter will be construed as a limitation or repeal of
any power granted by Wisconsin law.
§ 163-20. Severability. If any portion of this chapter is ruled unenforceable or invalid by a court, the remainder
of this chapter shall not be rendered invalid, ineffective, or unenforceable.
Formatted: Font: Bold
Formatted: Font: Bold
Formatted: Indent: Left: 0"
ORDINANCE 18-2026
REPEALING AND RECREATING CHAPTER 312 OF THE VILLAGE OF
COTTAGE GROVE CODE OF ORDINANCES
The Village Board of the Village of Cottage Grove, Dane County, Wisconsin, does hereby ordain
as follows:
Recitals
A. The Village of Cottage Grove operates and maintains a comprehensive stormwater
management system designed to collect, treat, and discharge stormwater.
B. Costs for operating, maintaining, and constructing facilities are currently paid for from
the Village’s general levy.
C. Wis. Stat. § 66.0821 grants the Village the authority to implement a stormwater utility
and to fund the stormwater utility via service charges.
D. The Village desires to create a stormwater utility to manage the operation and
maintenance of the Village’s stormwater system, and to fund the utility using service
charges.
E. The Village desires to amend chapter 312 of the Village of Cottage Grove Code of
Ordinances to create the stormwater utility and make other amendments to coincide
with current utility practices.
Ordinance
Section 1. Chapter 312 of the Village of Cottage Grove Code of Ordinances is hereby
repealed and replaced in its entirety with Exhibit A to this Ordinance.
Section 2. This Ordinance is conditioned upon the Village of Cottage Grove Utility
Commission establishing an initial equivalent residential unit charge not to exceed $8.90 per
month for the year 2027. If the Utility Commission establishes a charge that exceeds $8.90 per
month, then this Ordinance shall be null and void.
Section 3. This Ordinance shall become effective upon the condition in Section 2 being
satisfied and publication and notice of this Ordinance required by Wisconsin statutes.
BY ORDER OF THE VILLAGE BOARD VILLAGE OF COTTAGE GROVE
_________________________________
Cynthia Kelm-Nelson, Village President
ATTEST: _________________________________ Lisa Kalata, Village Clerk
EXHIBIT A
Chapter 312
WATER, SEWERS
AND STORMWATER MANAGEMENT
ARTICLE I
Administration
§ 312-1. Agreement to comply with rules and regulations.
All persons now receiving a water supply from the Utility, or who may hereafter make application
therefor, shall be considered as having agreed to be bound by all rules and regulations as filed with
the State Public Service Commission.
§ 312-2. Public Service Commission rules adopted.
The following provisions of Chapter PSC 185, Wis. Adm. Code, are adopted by reference and
made a part of these rules as if set forth in full. A violation of any of such rules shall constitute a
violation of this section and shall be punishable as provided in § 312-10.
185.11 Authorization for and Application of Rules.
185.12 Definitions.
185.13 General Requirements.
185.15 Free or Discriminatory Service Prohibited.
185.16 Protection of Utility Facilities.
185.17 Interference with Public Service Structures.
185.18 Location of Records.
185.19 Retention of Records.
185.21 Schedules to be Filed with the Commission.
185.22 Information Available to Customers.
185.31 Metered Service.
185.32 Meter Readings and Billing Periods.
185.33 Billing.
185.35 Adjustment of Bills.
185.36 Deposits.
185.37 Disconnection and Refusal of Service.
185.38 Deferred Payment Agreement.
185.39 Dispute Procedures.
185.41 Employees Authorized to Enter Customers'
Premises.
185.42 Customer Complaints.
185.43 Construction Records.
185.44 Records and Reports of Service Interruptions.
185.45 Pumpage Records.
185.46 Metering Equipment Records.
185.47 Other Records.
185.51 Requirement for Good Engineering Practice.
185.52 Construction Standards.
185.61 Meters.
185.65 Accuracy Requirements for Customer Meters.
185.71 Meter Testing Facilities and Equipment.
185.72 Calibration of Meter Testing Equipment.
185.73 Testing of Customer Meters.
185.74 Test Flows.
185.75 Required Tests of Customer Meters.
185.76 Periodic Tests.
185.77 Complaint Tests.
185.78 Referee Tests.
185.79 Testing of Metering Installations Having Remote
Registers.
185.795 Jumpering Meter Settings.
185.81 Quality of Water.
185.815 Adequacy of Water Supply.
185.82 Pressure Standards.
185.83 Station Meters.
185.84 Emergency Operation.
185.85 System Losses.
185.86 Flushing Mains.
185.87 Operation of Distribution System Valves and Hydrants.
185.88 Interruptions of Service.
185.89 Thawing Frozen Services.
§ 312-3. Utility Commission. [Amended 4-20-1987]
A. Composition. The Commission shall be comprised of one Village Board member and four
citizen members.
B. Appointments.
(1) Village Board member. The Village Board member of the Commission shall be
appointed by the Village President subject to confirmation by the Village Board. The
Board member shall serve for a two -year term commencing May 1 or until his/her
successor is appoi nted and confirmed by the Board. Only one member of the Village
Board shall be a member of the Utility
Commission at any one time.
(2) Citizen members. The citizen members of the Commission shall be appointed by the
Village President subject to confirmation by the Village Board. The citizen members
shall serve for two-year terms commencing May 1 or until their successors are appointed
and confirmed by the Board. The term of the new citizen member appointed pursuant to
the May 1991 ordinance change shall be for one year. Subsequent terms are to be
staggered so not more than two such appointments are made annually.
C. Duties and responsibilities.
(1) The Utility Commission shall be organized and function in accordance with the
provisions of Chapter 196 of the Wisconsin Statutes, under existing ordinances, rules,
policies and regulations of the Cottage Grove Utility Commission as of the date of
adoption hereof, and any and all applicable state or local laws or regulations pertaining
to the operations of water and sewer utilities.
(2) The express purpose of this section is to create a Commission to independently operate
the Village Water, Sewer, and Stormwater Utility as empowered and regulated by state
laws and to perform its functions separately from the Village Board and to be direct ly
answerable to the Village Board as well as the State of Wisconsin.
(3) The Utility Commission shall have the power to determine an emergency exists pursuant
to s. 62.15(1b), Wis. Stats., for bidding purposes.
ARTICLE II
Regulations
§ 312-4. Compulsory connection to water system.
A. Notice to connect. Whenever the public water system becomes available to any public,
commercial, mercantile or business building or any building used for human habitation, the
Public Works and Utilities Director shall notify in writing the owner, agent or occupant
thereof to connect thereto all facilities required by the Village. If the person to whom notice
has been given fails to comply within 120 days after notice, the Public Works and Utilities
Director shall cause the necessary connections to be made, and the expense thereof shall be
assessed as a special tax against the property pursuant to s. 281.45, Wis. Stats.
B. Deferred payment. The owner or his or her agent or the occupant may, within 30 days after
the completion of the work, file a written option with the Village Treasurer electing to pay the
amount of the assessment in five equal annual installments with interest on the unpaid balance
at .5% over the Village's rate of interest per year.
C. Privies and waterless toilets prohibited. After connection of any building to a sewer main
hereunder, no privy or waterless toilet shall be used in connection with such building.
§ 312-5. Cross-connection control.
A. Cross-connection defined. Any physical connection or arrangement between two otherwise
separate systems, one of which contains potable water from the Village water system and the
other water from a private source, water of unknown or questionable safety or steam, gases or
chemicals whereby there may be a flow from one system to the other, the direction of flow
depending on the pressure differential between the two systems.
B. Cross-connections prohibited. No person shall establish or permit to be established or
maintain or permit to be maintained any cross -connection. No interconnection shall be
established whereby potable water from a private, auxiliary or emergency water supply other
than the regular public water supply of the Village may enter the supply or distribution system
of the Village unless such private, auxiliary or emergency water supply and the method of
connection and use of such supply shall have been approved by the Utility Commission and
the Wisconsin Department of Natural Resources in accordance with Section NR 111.25(3),
Wis. Adm. Code.
C. The Utility Department may inspect, or arrange for an inspection of, property served by the
public water system for cross connections. The frequency of inspections shall be established
by the Utility Department, approved by the Wisconsin Department of Natural Resources and
in accordance with Wisconsin Administrative Code. Any unprotected cross -connection
identified by the inspection shall be promptly corrected. Failure to promptly correct an
unprotected cross-connection shall be sufficient cause for the Utility to discontinue water
service to the property, as provided by this chapter.
D. Right of entry. No person shall refuse entry to any representative of the Utility Department
upon presentation of credentials at any reasonable time to examine for cross-connections any
property served by a connection to the public water system of the Village. If entry is refused,
the representative shall obtain a special inspection warrant under § 66.122, Wis. Stats. On
request, the owner, lessee or occupant of any property so served shall furnish to the inspection
agency any pertinent information regarding the piping system or systems on such property.
E. Discontinuation of service.
(1) Authorized. The Utility Department is authorized and directed to discontinue water
service to any property wherein any connection in violation of this section exists and to
take such other precautionary measures deemed necessary to eliminate any danger of
contamination of the public water system.
(2) Notice required. Water service shall be discontinued only after reasonable notice and
opportunity for hearing under Ch. 68, Wis. Stats., except as provided in Subsection E(3).
Water service to such property shall not be restored until the cross-connection has been
eliminated in compliance with the provisions of this section.
(3) Service may be discontinued if a cross -connection or an emergency endangers public
health, safety or welfare and requires immediate action and a written finding to that effect
is filed with the Village Clerk and delivered to the customer's premises. The customer
shall have an opportunity for hearing under Ch. 68, Wis. Stats., within 10 days of such
emergency discontinuance.1
§ 312-6. Private wells.
A. Purpose. The purpose of this section is to prevent unused or improperly constructed wells
from serving as a passage for contaminated surface or near-surface waters or other materials
to reach the usable groundwater. These wells must be properly filled and sealed.
B. Application. All private wells located on any premises which is served by the public water
system of the Village shall be properly filled. Only those wells for which a well operation
permit has been granted by the Village Clerk may be exempted from this requirement, subject
to conditions of maintenance and operation.
C. Well operation permits. Application for a well operation permit shall be made on forms
provided by the Village Clerk. A permit may be granted to a well owner to operate a well for
a period not to exceed one year if the following requirements are met:
(1) The well and pump installation meet the requirements of Chapter NR 112, Wis. Adm.
Code, and a well constructor's report is on file with the Department of Natural Resources,
or certification of the acceptability of the well has been granted by the Private Water
Supply Section of the Department of Natural Resources.
(2) The well has a history of producing safe water and presently produces bacteriologically
safe water as evidenced by three samplings two weeks apart.
(3) The proposed use of the well can be justified as being necessary in addition to water
provided by the public water system.
(4) No physical connection shall exist between the piping of the public water system and the
private well.
D. Abandoned wells to be filled. Wells to be abandoned shall be filled according to the
procedures
1. Editor’s Note: Former Subsection F, Discontinuation of service, which immediately
followed, was repealed 8-19-2019 by Ord. No. 07-2019.
outlined in Chapter NR 112, Wis. Adm. Code. The pump and piping must be removed and
the well checked for obstructions prior to plugging. Any obstruction or liner must be
removed.
E. Reports and inspection. A well abandonment report must be submitted by the well owner to
the Department of Natural Resources on forms provided by that agency. Such forms are
available at the office of the Village Clerk. The report shall be submitted immediately upon
completion of the filling of the well. The filling must be observed by a representative of the
Village.
§ 312-7. Limits on liability for sewer system operation; restrictions on use.
A. Liability. The user of the Village sewerage system does so at his or her own risk. The Village
is not responsible for any damage caused by failure of the system to convey sewage from the
premises.
B. Backflow or backwater valves. Building drains subject to backflow or backwater at the time
of installation shall be provided with adequate backwater valve, installed to prevent
interference with the flow and be readily accessible for cleaning. It is the responsibility of the
Village Building Inspector to enforce this provision. It is the responsibility of the user of the
Village sewerage system to install adequate backwater protection at such time as the building
drain becomes subject to backflow.
C. Groundwater discharge. The connection of basement drains, sump pump drains, drain tile or
any other drain system the purpose of which is to alleviate a groundwater condition or which
may contribute groundwater at any time of the year to the Village sewerage system is
prohibited.
D. Unpolluted water discharge. Unpolluted water, including but not limited to cooling water,
boiler blowdown, swimming pool backwash or drain, shall not be discharged into the Village
sewerage system.
§ 312-8. Operation of valves and hydrants; unauthorized use of water.
No person shall, without authority of the Public Works and Utilities Director, allow contractors,
masons or other unauthorized persons to take water from the premises, operate any valve
connected with the street or supply mains or open any fire hydrant connected with the distribution
system, except for the purpose of extinguishing fire, or shall wantonly injure or impair the same.
Permits for the use of hydrants for the purchase of bulk water apply only to such hydrants as are
designated for such use.
§ 312-9. Restrictions on water use.
No person serviced by the Village Water Utility shall sprinkle or permit or allow the sprinkling of
any lawn, garden or premises with water provided by the Village Water Utility except in
accordance with a schedule to be issued by the Village President.
A. Power of Village President. The Village President shall have the power to issue an emergency
declaration regulating the use of water for sprinkling lawns or gardens in the Village. These
regulations may be in the form of a ban during certain hours of the day or certain days of the
week or an absolute ban on all sprinkling. Before declaring any such regulations, the Village
President shall first consult with the Public Works and Utilities Director to determine the
abilities of the Utility to supply an adequate supply of water for the Village residents. Said
regulations shall be effective until removed as provided herein.
B. Notice. The commencement of any regulations regarding sprinkling and the removal of such
regulations shall be by notice required by Wisconsin law. The regulations shall be
effective immediately upon posting. When no regulations are in effect, sprinkling may be done
at any reasonable time.
C. Permits. Any person who feels himself or herself aggrieved by such regulations may apply to
the Village President for a permit to be exempt from such regulations. No formal notice or
hearing shall be necessary for such a permit. Such permit shall be issued only if such
regulations cause an unnecessary hardship. A permit shall be issued where new sod or seeding
of lawns has been completed within two weeks prior to such regulations. Such permit shall
specify the hours during which sprinkling will be permitted, the length of time during which
the permit is valid and the property for which the permit is issued. The permit shall be posted
on the property where such sprinkling is taking place. Any person whose application for
permit is rejected by the Village President may apply to the Village Board for a per mit at its
next regular meeting.
§ 312-10. Violations and penalties.
Any person who shall violate any provision of this Part 1 or any regulation, rule or order made
hereunder shall be subject to a penalty as provided in Chapter 1, General Provisions, § 1-19 of
this Code.
Part 2
Sewer Use And Sewer Service Charges
ARTICLE III
General Provisions
§ 312-11. Introduction.
This Part 2 regulates the use of public and private sewers and drains, connections to the public
sewerage system, discharge of septage into the public sewerage system and the discharge of waters
and wastes into the public sewerage systems within the Village of Cottage Grove. It also provides
for and explains the method used for levying and collecting wastewater treatment service charges,
sets uniform requirements for discharges into the wastewater collection and treatment systems and
enables the Village to comply with administrative provisions and other discharge criteria which
are required or authorized by the State of Wisconsin or federal law. Its intent is to derive the
maximum public benefit by regulating the characteristics of wastewater discharged into the
sewerage system.
§ 312-12. Purpose; use of revenue; effect on other regulations.
A. This Part 2 provides a means for regulating the use of the public sewers, effectuating
connections thereto, determining wastewater volumes, constituents and characteristics, the
setting of charges and fees and the issuing of permits to certain users.
B. Revenues derived from the application of this Part 2 shall be used to defray the costs of
operating and maintaining the wastewater collection and treatment systems and to provide
sufficient funds for capital outlay, debt service costs and capital improvements. The charges
and fees herein have been established pursuant to requirements of the Wisconsin Statutes.
C. This Part 2 shall supersede any previous ordinances, rules or regulations of the Village of
Cottage Grove relating to the subject matter hereof and shall repeal all parts thereof that may
be inconsistent with this Part 2. If there is any conflict between this Part 2 and any applicable
Wisconsin Statute, the Wisconsin Statute shall control in such instance.
§ 312-13. Curative provisions.
All acts or actions performed or done by or on behalf of the Commission or Village prior to the
effective date of this Part 2 are hereby ratified, confirmed and declared to be valid.
ARTICLE IV
Terminology
§ 312-14. Definitions and word usage.
A. Unless the context specifically indicates otherwise, the meaning of terms used in this Part 2
shall be as follows:
APPROVING AUTHORITY — The Village of Cottage Grove Utility Commission or its duly
authorized committee, agent or representative.
BUILDING DRAIN — That part of the lowest horizontal piping of a drainage system which
receives the discharge from soil, waste and other drainage pipes inside the walls of the
building or structure and conveys it to the building sewer.
BUILDING SEWER — The pipe extension beginning at the outside of the inner face of the
building wall to a point of connection with the public sewer.
CARBONACEOUS BIOCHEMICAL OXYGEN DEMAND (CBOD) — The quantity of
oxygen
used in the biochemical degradation of organic material in five days at 20° C. when the
oxidation of reduced forms of nitrogen is prevented by the addition of an inhibitor. This
analytical procedure shall be performed in accordance with Standard Methods.
CFR — The Code of Federal Regulations.
COMMISSION — The Village of Cottage Grove Utility Commission.
COMPATIBLE POLLUTANTS — Carbonaceous biochemical oxygen demand, suspended
solids and total kjeldahl nitrogen, plus additional pollutants identified in the WPDES permit
for the publicly owned treatment works receiving the pollutant if such works were designed
to treat such additional pollutants to a substantial degree.
FLOATABLE OIL — Oil, fat or grease in a physical state such that it will separate by
gravity from wastewater by treatment in an approved pretreatment facility. A wastewater or
septage shall be considered free of floatable fat if it is properly pretreated and the wastewater
does not interfere with the collection or treatment system.
GARBAGE — The residue from the preparation, cooking and dispensing of food and from
the handling, storage and sale of food products and produce.
GROUND GARBAGE — The residue from the preparation, cooking and dispensing of food
that has been shredded to such degree that all particulates will be no greater than 1/2 inch in
any dimension and will be carried freely in suspension under normal flow conditions in
sewers.
INCOMPATIBLE POLLUTANTS OR WASTEWATER — Wastewater or septage with
pollutants of such a strength that will adversely affect or disrupt the wastewater treatment
processes or effluent quality or sludge quality if discharged to the sewerage system facility.
INDUSTRIAL WASTE — The wastewater from an industrial process, trade or business, as
distinct from sanitary sewage, including cooling water and the discharge from sewage
pretreatment facilities.
MMSD ORDINANCE — The Sewer Use Ordinance of the Madison Metropolitan Sewerage
District (herein "MMSD") adopted in September 1984, and any amendments thereto or
restatements thereof.
MUNICIPAL WASTEWATER — The wastewater of a municipality, including that of the
utility. From the standpoint of source, it may be a combination of the liquid and water-
carried wastes from residential and commercial buildings, industrial plants and
institutions, together with any groundwater, surface water and stormwater that may have
inadvertently entered the sewerage system of the municipality.
NATURAL OUTLET — Any outlet, including storm sewers, into a watercourse, pond, ditch,
lake or other body of surface water or groundwater.
PARTS PER MILLION — A weight-to-weight ratio. The parts per million value multiplied
by the factor 8.34 shall be equivalent to pounds per million gallons of water.
PERSON — Any and all persons, including any individual, firm, company, municipal or
private corporation, association, society, institution, enterprise, government agency or other
entity.
pH — The logarithm of the reciprocal of hydrogen ion concentration. The concentration is the
weight of hydrogen ions, in grams per liter of solution. Neutral water, for example, has a pH
value of 7 and a hydrogen ion concentration of 10.
PUBLIC SEWER — Any sewer owned or provided by or subject to the jurisdiction of the
Village or any other municipality.
PUBLIC WORKS AND UTILITIES DIRECTOR — The Village Public Works and Utilities
Director, or their designee.
SANITARY SEWAGE — A combination of liquid and water-carried wastes discharged from
toilets and/or sanitary plumbing facilities, together with such groundwater, surface water and
stormwater as may have inadvertently entered the sewerage system.
SANITARY SEWER — A sewer that carries liquid and water -carried wastes from
residences, commercial buildings, industrial plants and institutions, together with small
quantities of groundwater, stormwater and surface water that are not admitted intentionally.
SEPTAGE — The wastewater or contents of septic or holding tanks, dosing chambers, grease
interceptors, seepage beds, seepage pits, seepage trenches, privies or portable rest rooms.
SEWERAGE SYSTEM — All structures, conduits and pipes by which sewage is collected,
treated and disposed of, except plumbing inside and in connection with buildings served, and
service pipes, from building to street main, i.e., a building sewer.
SEWER SERVICE CHARGE — A service charge levied on users of the wastewater
collection and treatment facilities for payment of use -related capital expenses as well as the
operation and maintenance costs, including replacement costs, of said facilities.
SEWER SYSTEM — The public sanitary sewers within a sewerage system. The facilities
which convey wastewater from individual structures, from private property to the public
sanitary sewer, or its equivalent, are specifically excluded from the definition of " sewer
system," except that pumping units and pressurized lines for individual structures or groups
of structures may be included as part of a "sewer system" when such units are cost effective
and are owned and maintained by the Commission in question. Lift stations or pumping
stations and all appurtenances thereto are included in this definition. For example, a building
sewer is not part of the sewer system.
SLUG LOAD — Any substance release at a discharge rate and/or concentration which causes
interference to wastewater treatment processes or plugging or surcharging of the sewer
system.
STANDARD METHODS — The examination and analytical procedures set forth in the most
recent edition of "Standard Methods for the Examination of Water, Sewage and Industrial
Wastes" published jointly by the American Public Health Association, the American Water
Works Association and the Water Pollution Control Federation and in compliance with
federal regulations 40 CFR 136, "Guidelines Establishing Test Procedures for Analysis of
Pollutants," all as amended from time to time.
STATS — The Wisconsin Statutes in effect from time to time.
STORM DRAIN — A drain or sewer for conveying water, groundwater, subsurface water or
unpolluted water from any source.
STORMWATER RUNOFF — That portion of the rainfall that is collected and drained into
the storm sewers.
SUSPENDED SOLIDS — Solids that either float on the surface of, or are in suspension in,
water, wastewater, septage or other liquids and that are removable by laboratory filtering as
prescribed in Standard Methods and referred to as "nonfilterable residue."
TOTAL KJELDAHL NITROGEN (TKN) — The quantity of organic nitrogen and
ammonia as determined in accordance with Standard Methods.
TOTAL PHOSOPHORUS (TP) — The quantity of total phosphorus as determined in
accordance with the Standard Methods.
VILLAGE — The Village of Cottage Grove, a municipal corporation located in Dane
County, Wisconsin.
VILLAGE BOARD — The Village Board of the Village.
WASTEWATER FACILITIES — The structures, equipment and processes required to
collect, carry away, store and treat domestic and industrial waste and septage and dispose of
the effluent and sludge.
WASTEWATER TREATMENT WORKS — An arrangement of devices and structures for
treating wastewater, septage, industrial waste and sludge. Sometimes used as synonymous
with "waste treatment."
WATERCOURSE — A natural or artificial channel for the passage of water, either
continuously or intermittently.
WPDES — Wisconsin Pollutant Discharge Elimination System.
B. "May" is permissible; "shall" is mandatory.
ARTICLE V
Management, Operation and Control
§ 312-15. Management vested in Commission; records.
The management, operation and control of the sewer system for the Village shall be vested in the
Utility Commission. All records, minutes and all written proceedings thereof shall be kept by the
Village Clerk. The Finance Director or designee shall keep all the financial records thereof.
§ 312-16. Construction authority.
The Commission shall have the power to construct sewer lines for public use and shall have the
power to lay sewer pipes in and through the public alleys, streets, easements, and public grounds
located within the Village and generally to do all such work as may be found necessary or
convenient in the management of the sewer system. The Commission shall have power by itself,
its officers, agents and servants to enter upon any land in the Village for the purpose of making
examination or supervising in the performance of its duties under this Part 2, without liability
therefor, and the Commission shall have the power to purchase and acquire for the Village for the
benefit of the Commission all real and personal property which may be necessary for construction
of the sewer system or for any repair, remodeling or additions thereto.
§ 312-17. Owner's maintenance of building sewer.
The owner of property abutting a public sewer shall maintain sewer service from the public sewer
main to the structure or building on the owner's property, including all controls between the same,
without expense to the Village or Commission, except when they are damaged as a result of
negligence or carelessness on the part of the respective Village or Commission. Without intending
to limit the generality of the foregoing, the owner has the sole responsibility for the repair and
maintenance of all building sewers, and the ownership thereof shall at all times be vested in such
property owner. All sewer services must be maintained free of defective conditions by and at the
expense of the owner or occupant of the property. When any sewer service is to be relayed and
there are two or more buildings on such service, each building shall be disconnected from such
service and a new sewer service shall be installed for each building. In the event of any obstruction
of, damage to or repair of a building sewer, the same shall be the responsibility of the property
owner, except as provided for in § 312-27 hereof or as otherwise provided for herein.
§ 312-18. Title to real estate and personal property.
All property, real, personal and mixed, including but not limited to easements, acquired for the
construction of each sewer system, and all plans, specifications, diagrams, papers, books and
records connected therewith, and all buildings, machinery and fixtures pertaining thereto, shall be
the property of and titled in the name of the Village for the benefit of the Commission. Nothing
contained in this Part 2 shall be construed as revoking, changing, abandoning or otherwise altering
any conveyance of property previously made to the Village prior to the effective date of this Part
2, and such title shall be deemed to be vested in the Village as provided for herein.
§ 312-19. Authority of Village and Commission.
Nothing contained in this Part 2 shall be construed as limiting the power and authority of the
Village or Commission as provided for by applicable Wisconsin Statutes, and the Village and
Commission shall have all rights and authority as provided for by law.
§ 312-20. Taking of real estate.
Whenever any real estate or any easement therein or use thereof shall in the judgment of the
Commission be necessary to the sewer system, and whenever for any reason an agreement for
purchase from the owners cannot be made, the Commission after approval of the Village Board
shall proceed with all necessary steps to take such real estate easement or use by condemnation in
accordance with the Wisconsin Statutes and any other applicable federal or state provisions.
ARTICLE VI
Administrative Rules and Regulations
§ 312-21. Establishment.
The following rules and regulations for the government of licensed plumbers, sewer users,
property owners and others are hereby adopted and established.
§ 312-22. General provisions.
A. Agreement to rules and regulation. The rules, regulations and sewer rates of the Village and
Commission contained herein shall be considered a part of the contract with every person,
company or corporation who or which is connected to or uses the Village sewer system, and
every such person, company or corporation, by connecting with the sewer system, shall be
considered as expressing his or its assent to be bound thereby.
B. Application for service. Every person desiring to connect property, buildings or structures to
public sewers shall make application in writing to the Public Works and Utilities Director, on
such forms as are prescribed for that purpose, prior to commencing use of such service. The
application must describe fully and truthfully all the wastes which are anticipated to be
discharged. If the applicant is not the fee simple owner of the property, the written consent of
the owner must accompany the application. Persons connected to the public sewers of the
Village are referred to herein as "users." By submitting such an application, all users are
deemed to have agreed to be bound by this Part 2, as amended from time to time. If it appears
that the service applied for will not provide adequate service for the contemplated use, the
Public Works and Utilities Director may reject the application. If the Public Works and
Utilities Director approves the application, a building permit will be issued as shown on the
application. No service shall be provided or application approved without prior payment of
all applicable fees.
C. Application fee. Where the application for service is for a connection to the public sewers,
the application shall be accompanied by an application fee(s) in an amount to be determined
from time to time by the Commission. Such fee shall cover the cost of processing the
application and inspection of the connection. Application fees may vary in amount between
residential users and commercial/ industrial users. The payment of this fee shall be in addition
to any connection fees that may be charged to or on account of new users by the Commission
or by MMSD.
D. Inspections. Any connection to the public sewers within the Village shall be subject to the
prior inspection and approval of the work by an authorized representative of the Commission.
No trench or other excavation shall be filled, or any connection completed, without such prior
inspection. The applicant requesting the connection shall reimburse the Commission for all
inspection costs incurred, if not previously paid as part of the application fee.
E. Disconnection and refusal of service. Sewer service may be disconnected or refused for any
of the following reasons:
(1) Violation of this Part 2, as amended from time to time.
(2) Violation of the MMSD Ordinance, as amended from time to time.
(3) Failure to pay the application fee, any connection fee or delinquent account of the user.
F. Disconnection for delinquent accounts. A bill for service is delinquent if unpaid after the due
date shown on the bill. The Commission may disconnect service for a delinquent bill by
giving the user, at least eight calendar days prior to disconnection, a written disconnect notice
which may be included in the bill for service.
Text truncated. Open the original for the full document.
Source: Village of Cottage Grove website. First collected Oct 25, 2026.