Plan Commission Meeting — Agenda Packet
Village of Mount Horeb · Dane County · Plan Commission · meeting of Oct 28, 2026 · Agenda packets
Open the original document More from Village of Mount Horeb
This document is no longer listed on Village of Mount Horeb's website. We kept the copy we read.
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Administrative Offices
Municipal Building - 138 East Main Street
Mount Horeb, Wisconsin 53572
608.437.6884 | mounthorebwi.info
Plan Commission Meeting Agenda
Wednesday, October 28, 2026 at 7:00 PM
Mount Horeb Senior Center
107 North Grove Street
Mount Horeb, WI
1) Call to order
2) Roll call
3) Public Participation
Participants may speak for up to three minutes. To participate, please complete a public
comment form at the Board Room entrance and submit it to staff before the meeting
begins. See below for more details.
4) Consent Agenda
All items listed below are considered to be routine by the Governing Body and will be
enacted by one motion (roll call vote). There will be no separate discussion of these
items unless a Board member so requests, in which event the item will be removed
from the Consent Agenda and considered as the first item after the Consent Agenda.
a. Consideration of August 26, 2026 Meeting Minutes
5) Chair's Report
a. Chair Report
6) Staff Reports
a. Staff & Consultant Reports
7) Action Items
a. Site Plan Review: Jeff Grundahl: consider approval of the site plan application
for 208, 214, and 220 East Main Street
1. Presentation from Applicant
2. Public Participation on Application
3. Staff Comment on Application
4. Commission Discussion and Potential Action
8) Adjournment
Page 1 of 251
*Public Comment Policy
Members of the public are invited to speak at meetings of all Mount Horeb Public Bodies. To comment, please complete a Public Comment
Form at the Meeting Room entrance and submit it to staff before the meeting begins. Comments are limited to three minutes, must be made
from the podium, and the speaker must return to the audience after speaking.
• Non-agenda item comments are heard at the start of the meeting. Public Body members and staff will not engage in discussion
during public comment but may consider topics for future agendas.
• Agenda item comments are heard during the relevant item, after the proposers or staff present the item and before Public Body
discussion. All public comments on the item will be heard before any discussion by the Public Body.
Members of the public will only be allowed to speak outside these public comment times if they are invited by the meeting chair to share
additional information requested by the Public Body. If so invited to speak, the member of the public must do so from the podium.
Written comments are also welcome. Written comments shall include the name and address of the submitter and should be submitted to the
Deputy Treasurer/Governance Coordinator by email at niki.erickson@mounthorebwi.info (subject line: Public Comment Request-Name of
Public Body) or delivered by to the Village at: 138 E Main Street, Mount Horeb WI, 53572, ATTN Public Comment Request-Name of Public
Body.
UPON REASONABLE NOTICE, EFFORTS WILL BE MADE TO ACCOMMODATE THE NEEDS OF DISABLED INDIVIDUALS THROUGH
APPROPRIATE AIDS AND SERVICES. FOR INFORMATION OR TO REQUEST THIS SERVICE, CONTACT ALYSSA GAFFNEY, CLERK,
AT 138 E MAIN STREET, MOUNT HOREB, WI (608) 437-9404.
Page 2 of 251
PLAN COMMISSION AGENDA
Wednesday, August 26, 2026 at 7:00 PM
DRAFT MEETING MINUTES
1) Call to order
Chair Ryan Czyzewski called the meeting to order at 7:00 pm in the Board Room of the
Municipal Building, 138 East Main Street, Mount Horeb, WI.
2) Roll call
Members Present: Ryan Czyzewski, Stephanie Gauthier-Phillips, Andrew Kidd, Jill Remmert-
Willis, Ben Vondra, Peggy Zalucha
Members Absent: Sarah Best
Others Present: Village Administrator Gabe Altenbernd, Village Planner Sonja Kruesel, Assistant
Clerk Jean Culberson
3) Public Comments on Non-Agenda Items
None.
4) Consent Agenda
a. Consideration of July 22, 2026 Meeting Minutes
Zalucha Motioned to approve the Consent Agenda and Remmert-Willis seconded.
Motion carried by unanimous voice vote.
5) Agenda Items
a. Extra Territorial Jurisdiction CSM: Joe Voell: consider approval of an ETJ CSM for Joe
Voell in the Town of Springdale.
Kruesel summarized the CSM. Kidd Motioned to approve the ETJ CSM Zalucha
seconded. Motion carried by unanimous voice vote.
b. Certified Survey Map: John Temby: consider approval of the certified survey map
Kruesel summarized and informed Planner Ben Rohr recommended a rezone to
Conservancy. Vondra Motioned to approve the CSM conditioned on the rezone. Zalucha
seconded and Motion carried by unanimous voice vote.
c. Hidden Ridge Subdivision
1. Public Hearing: public hearing regarding the request to rezone property
located at parcel #0606-121-1208-8 from Parks and Recreation [PR] to
Conservancy [CON]
Kruesel summarized the project including Planner Ben Rohr’s
recommendations in the August 26, 2026 Review Report in the agenda
packet. Wade from Wyser Engineering discussed the CSM and requested
removal of the 11,600 sq ft in recommendations 1 and 3.
Public Hearing opened at 7:12pm
Resident Jim Larson at 122 Jennifer Circle spoke in favor of the project.
Public Hearing closed at 7:13pm
Page 3 of 251
2. Rezone: Consider approval of an amendment to the Official Zoning Map to
rezone property located at parcel #0606-121-1208-8 from Parks and
Recreation [PR] to Conservancy [CON]
Gauthier-Phillips Motioned to approve the Zoning Map Amendment from AG to
Conservancy for outlot 1 subject to conditions a) and b). Kidd seconded and
Motion carried by unanimous voice vote.
3. Final Plat: consider approval of the Hidden Ridge Subdivision Final Plat
Gauthier-Phillips Motioned to approve the Final Plat subject to the stated
conditions a) and b) in the recommendations and removal of the 11,600 square
foot language. Vondra seconded and Motion carried by unanimous voice vote.
d. Specific Implementation Plan: JT Klein, Inc: consider approval of Amendment
No.2 to the SIP
Kruesel and JT Kein representatives summarized the amendment of the exterior
building material from stone to brick. The Commission discussed the request.
Zalucha Motioned to approve Amendment No.2 to the SIP and Remment-Willis
seconded. Motion carried by unanimous voice vote.
e. Site Plan Review: Village of Mount Horeb: consider approval of the Grundahl
Park Building Site Plan
Kruesel summarized the Recommendations in the August 26, 2026 Site Plan Review in
the agenda packet. Andrew Kidd recused himself from the item. The Commission and
Parks Superintendent Jeff Gorman discussed the façade and if it was possible to add
windows, décor or brick. The Commission recommended staff research design
guidelines for Village projects. Gauthier-Phillips Motioned to approve the Site Plan
subject to the following conditions waived: the curbing for paved areas, design
requirement for building materials, articulation, window and door openings, and the
durable base material. Additional Requests: the Parks and Rec to considered aesthetic
improvements to the building (outside of building materials) and the photometric plans
to be reviewed by staff. Zalucha seconded and the Motion carried by unanimous voice
vote.
f. Site Plan Review: Premier Cooperative: consider approval of the site plan
application for 501 West Main Street
Kruesel summarized the Recommendations in the August 26, 2026 Site Plan Review in
the agenda packet. Matt Severson from Premier Cooperative informed the Commission
that the Project Narrative was submitted late and the recommendations were met with
exception to the windows. Czyzewski recommended staff to review the design
recommendations and refer back to the Commission if needed. Czyzewski Motioned to
the approval of the Site Plan waiving the requirement for the windows. Kidd seconded
and the Motion carried by unanimous voice vote.
g. Conceptual Review: Premier Cooperative: requesting an initial concept review for a
proposed expansion.
Administrator Altenbernd and Matt Severson from Premier Cooperative spoke on the
expansion and the dead-end for West Garfield Street. Wade Wyser from Wyser
Engineering spoke on the future land use map plans and Meadow View Road as an
extension for future development. The Commission discussed the expansion including
The crossing at Highway ID and vacating West Garfield Street. Applicant will proceed
with the next steps.
Page 4 of 251
6) Chair Report
No Report.
7) Staff Report
a. Village Planner
Altenbernd informed on the Technical Staff meeting and a future agenda item regarding
Sienna Hills.
b. Building Inspector
Report in Packet.
8) Meeting adjournment.
Kidd Motioned to adjournment at 9.02 pm and Remment-Willis seconded. Motion carried by
unanimous voice vote.
Minutes by Clerk Jean Culberson
Page 5 of 251
Agenda Item Report
Plan Commission: Wednesday, October 28, 2026
Chair's Report: Chair Report
Recommendation
Background
Thank you to all in attendance and participation tonight. A special thank you to our Video crew for their work
on the satellite setup, as I know the offsite meetings are not easy to setup, nor conducive to capturing
effective Commission discussion. I apologize for missing this month’s Plan Commission meeting, I have a
previously booked engagement scheduled since April. Thank you Trustee Best for serving as Chair tonight and
helping ensure the meeting runs effectively with the help of the Commission, Staff, and Public.
Looking at this month’s agenda, I know the Plan Commission members and staff have performed their due
diligence to ensure agenda items receive the attention they deserve so questions are answered tonight. As
always, I have prepared some agenda comments and questions to Village Administrator Gabe Altenbernd
that he may share with the Commission. As always, I extend my appreciation to Plan Commission members
for your service in reviewing projects that while you work to address Mount Horeb’s Comprehensive Plan.
The work this body has done over the past several years for the Comprehensive Plan and then Zoning Code
rewrite was a long road with lots of discussion, analysis, and healthy debate. Not everyone will agree with all
aspects of those, or of a particular project or its components. However, these public processes established
the roadmap and rulebook for the Village, applicants, and public to follow.
In the near future the Plan Commission will be reviewing and recommending technical updates to the zoning
code as previously planned and discussed. And, rather than wait 40 years, expect future potential policy
components to be reviewed and updated to match future Board strategic planning and Comprehensive Plan
updates. We are all getting use to this fundamental shift in how applications process through the Village,
primarily seen by less PUD applications. I appreciate staff help with the learning curve.
Financial Impact
n/a
Attachments
Prepared By
Ryan Czyzewski, Village Board President
Page 6 of 251
Agenda Item Report
Plan Commission: Wednesday, October 28, 2026
Staff Reports: Staff & Consultant Reports
Recommendation
Background
Financial Impact
N/A
Attachments
Prepared By
1. August Permits & Inspector Update
2. Sept Permits & Inspector Update
Page 7 of 251
Building Department Report
August 2026 Permits
• 3 General Commercial Permits
• 1 Single Family Residential – Windflower Village
• 40 General Residential Permits
Commercial Project Progress Report
August 2026
__________________________________________________________________________________________
105 W Front Street / Front Street Station
Construction continues on the Front Street Station project. Wood framing of the building is now underway,
with required inspections and trade coordination continuing as construction advances.
207 Academy Street / Primary Center
Construction continues at the Primary Center. Wall erection and floor installation are underway, with required
inspections, testing documentation, and trade coordination continuing as the project advances.
900 E Garfield Street / Middle School
The two new bathrooms within the existing boys locker room have been completed.
Prepared by: Ryan Lindsey, 3C Inspect LLC
Page 8 of 251
Building Department Report
September 2026 Permits
• 3 General Commercial Permits
• 1 New Commercial TJK Design – 100 Lillehammer – 5 unit
• 2 Single Family Residential – Brookstone Hills & North Cape
• 28 General Residential Permits
Village of Mount Horeb
Building Department
Commercial Project Progress Report
September 2026
October 28, 2026 Plan Commission | Updates through October 22, 2026
_______________________________________________________________________________________
105 W Front Street / Front Street Station
Construction and electrical work continued during September, along with required plan and inspection coordination.
Roof-truss inspection was scheduled for October 19. Signage review is scheduled for the November 18 Plan Commission
meeting.
401 South Second Street / Mount Horeb Elementary School
Formerly the Primary Center at 207 Academy Street. Addition work continued with slab construction and underground
electrical installation. Concrete testing documentation was received in September; underground conduit work in Areas C
and D was nearing completion in early October.
101 and 103 Perimeter Road / JT Klein Apartments
Both early-start permits have been approved and paid. Footing and foundation work may proceed under those permits.
Full building plan review remains in progress.
100 Lillehammer Lane / Multi-Tenant Commercial Building
All permits have been approved, and footing work is planned to begin the week of October 26. An onsite meeting with
the superintendent is scheduled for Monday, October 26.
500 N 8th Street / Gunderson Funeral Home
Plans for replacement of the crematory equipment were submitted for review in September. Conditional building plan
approval was received October 16.
Prepared by: Ryan Lindsey, 3C Inspect LLC
Page 9 of 251
PLAN COMMISSION APPLICATION
PROJECT NAME: _______________________________________________________________________________________________________
Project Address ______________________________________________ Parcel Number: __________________________________
Access Dane Link
Zoning Map
Current Zoning_______________________________ Future Land Use Zoning: __________________________________________
(select zoning layer in map) (select future land use layer in map)
APPLICANT:
ADDRESS:
PHONE: EMAIL:
OWNER:
ADDRESS:
PHONE: EMAIL:
PROJECT DESCRIPTION: _________________________________________________________________________________________
______________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________
OWNER/APPLICANT SIGNATURE: ________________________________________________________DATE: ___________________
FEES & DEPOSITS
: (CHECK ALL THAT APPLY)
Application Fee Public
Hearing-
Certified Survey Map (CSM) scroll to Section 18.61 in schedule Schedule
Certified Survey Map Extraterritorial scroll to Section 18.61 in schedule Schedule
Comprehensive Plan Amendment $150.00 Class One
Conditional Use Permit (changes in USE of property) $150.00 Class Two
Conditional Use Permit (planned development district)
$200.00 Class Two
Design Review $100.00
General Development Plan (GDP) $200.00
Specific Improvement Plan (SIP) $300.00
Zoning Amendment (changes in zoning) $150.00 Class Two
Zoning Amendment (planned development district) $200.00 Class Two
VILLAGE OF MOUNT HOREB
Zoning Administrator 608-437-9409
138 East Main Street
Mount Horeb, WI 53572
Developer Deposit:
An escrow deposit is
required in accordance
with the Development
Application Agreement.
Total Fee Paid:
____________
Date: ______________
Fee Waived By:
____________________
Page 10 of 251
The Village of Mount Horeb Plan Commission meets the fourth Wednesday of the month, unless
noted on calendar. A schedule of deadlines can be found on the Zoning page of the Village
website: Plan Commission Calendar. Consultation with the Village Administrator is highly
encouraged to discuss procedure and necessary forms prior to any submittal.
Note: applications requiring a public hearing will be scheduled for a hearing according to the
publication deadline, with action considered at the scheduled Plan Commission meeting following the
public hearing. Applicants are encouraged to contact the Village Administrator for a pre-application
meeting to review the project and submittal requirements prior to submitting an official application.
Class One = Published in newspaper for one week / Class Two = Published in newspaper for two weeks
Application submittals should include:
• Fully executed Plan Commission Application
• Fully executed Development Application Agreement (attached)
• A development agreement is a voluntary contract between a local jurisdiction and a
person who owns or controls property withing the jurisdiction, detailing the
obligations of both parties and specifying the standards and conditions that will
govern development.
• Full payment for all associated fees
• Written narrative of the proposed project
• One electronic copy of full submittal emailed to (2 parties)
gabe.altenbernd@mounthorebwi.info
and mhbuildinginspector@mounthorebwi.info,
• or provided to our offices on a USB device or submitted via downloaded file
All submittals must contain the following to be considered complete:
1) Written narrative must include:
a. Owner and/or developer names and addresses
b. Where applicable; architect and/or engineer names and addresses
c. Description of proposed uses
d. Calculation indicating total site size, building floor area, number of parking stalls,
amount of impervious surface, and amount of non-impervious green space
2) A scaled site plan which must include:
a. Name of project and date of plan preparation
b. Scale of drawing and north arrow
c. Property boundaries
d. Where applicable; both the one hundred (100) year recurrence interval floodplain
and the floodway delineations
e. Where applicable; wetlands as delineated in the WDNR Wetland Inventory and 75’
setback line from such wetlands
f. Existing and proposed easements on the subject property
g. Adjoining public street rights-of-way, street pavements, and sidewalk locations;
existing and proposed driveways and curb cuts; and parking and loading areas
h. Location of existing and proposed building footprints with building and yard setback
lines indicated
i. Location and size of any existing or proposed signs and fencing
j. Location and type of all outdoor lighting proposed to illuminate the site; including a
photometrics plan of the site.
3) Building Plans which must include:
Page 11 of 251
a. Elevation drawing of each new or remodeled building façade, indicating height,
materials and building dimensions
b. Colored renderings of all façades of the principal building showing the proposed
colors
c. Building materials samples (upon request)
4) Grading and Stormwater Management Plan, including:
a. Existing and proposed topography shown at a contour interval of not less than two
(2) feet at National Geodetic Vertical Datum
b. Location and dimension of Stormwater retention or detention basins and/or
stormwater conveyances
5) Landscape Plan that meets all landscaping standards
6) Parking Calculations
7) Escrow fees as outlined in the Development Application Agreement
8) Erosion Control and Stormwater Management Application and fees. *No person may begin a
land disturbing construction activity or land developing activity subject to this division until
the person has paid the Erosion Control Review and Inspection fee.
9) Erosion Control Plan
10) Signage Plan
11) Design Review guideline
12) Refer to Mount Horeb Village Code Chapter 17- Zoning Code for all supporting details of
required documentation.
Please note Chapter 17 is the new adopted code Effective as of March 12, 2026
Page 12 of 251
DEVE
LOPMENT APPLICATION AGREEMENT
This Development Application Agreement (the “Agreement”) is made and entered into
this day of , , by and between the Village of Mount Horeb, a
Wisconsin municipal corporation (the “Village”), and (the
“Applicant”).
RECITALS
A. The Applicant plans to file, or has filed, an application for approval by the Village of one
or more of the following activities within the Village’s jurisdiction: site plan / conditional
use permit / rezone / variance / other development (hereinafter refe rred to as the
“Development”).
B. The Village desires to review and take action on the Development in a timely manner in
accordance with all applicable federal, state and local laws and regulations, and without
unreasonable expense to Village taxpayers.
C. The
Applicant agrees and acknowledges that decisions and approvals regarding the
Development are legislative determinations to be made in the Village’s discretion and that
the Applicant’s compliance with this Agreement does not, in any way, entitle the Applicant
to approval of the Development.
D. The
process of reviewing the plans and documents associated with the Development will
cause the Village to incur direct and indirect expenses including, but not limited to, staff
time and fees and expenses incurred by the Village for outside consultant ser vices related
to review of the Development ( e.g., engineers, attorneys, accountants, planners, and other
professionals).
NO
W, THEREFORE, for and in consideration of the mutual covenants contained
herein, and for good and valuable consideration, the Village and the Applicant agree as follows:
1. Re
citals. The representations and recitations set forth in the foregoing paragraphs are
material to this Agreement and are hereby incorporated into and made a part of this
Agreement as though they were fully set forth in this paragraph.
2. Appl
icant to Reimburse Village Review Costs. The Applicant shall reimburse the Village
for all direct and indirect costs and expenses related to the Village’s review of the
Development. The direct and indirect costs and expenses include, but are not limited to,
staff time and fees and expenses incurred by the Village for outside consultant services
(e.g., engineers, attorneys, accountants, planners, and other professionals). For purposes
of this Agreement, the direct and indirect costs and expenses shall be referred to as
“Review Costs.” Village staff time shall be charged at
current rates.
Page 13 of 251
3. Deposit Required to Fund Reimbursement Account.
a. To ensure that funds are readily available to the Village for reimbursement of
the Review Costs as provided in paragraph 2 above, the Applicant shall deposit
with the Village an amount determined by the Village Zoning Administrator to
be used to pay the Re view Costs (the “Deposit”). The Village Zoning
Administrator shall use the following table as a guide to determine the amount
of the Deposit:
(1) Small additions (<2,500 sf) shall require a $1,500 Deposit.
(2) Small-sized projects (<5,000 sf) shall require a $3,500 Deposit.
(3) Medium-sized projects (<10,000 sf) shall require a $5,500 Deposit.
(4) Large-sized projects (>10,000 sf) shall require a $10,000 Deposit.
(5) In addition to the amounts identified in (1) through (4), any Development
that requires a development agreement or tax incremental financing
assistance from the Village shall require an additional $5,000 to $10,000
Deposit.
All Deposit amounts shall be determined by the Village Zoning Administrator
in his/her sole discretion and are not subject to challenge by the Applicant.
Generally small additions will be less than 2,500 square feet, small projects less
than 5,000 square f eet, medium projects less than 10,000 square feet and large
projects are over 10,000 square feet.
b. The Applicant is responsible for payment of all Review Costs regardless of
whether the amount exceeds the amount initially deposited with the Village. The
Village reserves the right to require the Applicant to deposit additional amounts
if the Village Zoning Administrator determines that additional amounts are
necessary because of the size of the Development or because the Reimbursement
Account (defined below) has been depleted.
c. The Deposit may be provided in the form of cash, a certified check, cashier’s
check, personal check, or some other form as approved by the Village.
d. The required Deposit must be made by the Applicant upon execution of this
Agreement.
e. The Applicant agrees and acknowledges that the Village will not process the
application(s) associated with the Development and that the Village may
suspend or otherwise stop activities associated with the Development if the
Applicant fails to comply with this Agreement.
f. The Village shall place and maintain the Deposit in a segregated, non- interest-
bearing account to be used solely for the purpose of reimbursing the Review
Costs in accordance with paragraph 4 below (the “Reimbursement Account”).
2
Page 14 of 251
4. Village Withdrawals from the Reimbursement Account.
a. After complying with the notification requirements of paragraph 4.b. below, the
Village is entitled to make withdrawals from the Reimbursement Account to pay
Review Costs in accordance with paragraph 2 above.
b. Not less than 5 days prior to making any withdrawal from the Reimbursement
Account, the Village shall provide the Applicant with an itemized invoice for
Review Costs incurred, together with a written notice of the Village’s intent to
withdraw such funds from the Reimbursement Account.
c. Withdrawals from the Reimbursement Account may be made as often as
necessary to reimburse the Review Costs. In the event that the balance of
Applicant’s Reimbursement Account reaches $1,000 or less, the Village shall
have the discretion to continue withdra wing funds from the Reimbursement
Account; to invoice the Applicant directly for payment; or to require the
Applicant to pay additional monies to the Village, which monies shall be
deposited in the Reimbursement Account. Payments for directly invoiced bill s
shall be due 30 days from the date the invoice is mailed to the Applicant.
d. Any amounts remaining in the Reimbursement Account after the Village as
taken final action on the Development and all Review Costs have been paid shall
be promptly refunded to the Applicant.
5. Authority/Binding Effect . The parties agree that the undersigned signatories to this
Agreement have full power and authority to act on behalf of the Village and the
Applicant, and that all necessary and enabling resolutions have been enacted. This
Agreement shall bind the heirs, successors and assigns of the Applicant and the Village.
6. Notification of Parties.
Any notices to be provided under this Agreement may be made by delivery in person,
by First Class mail, or by electronic mail (request a read receipt required) as provided
below:
To Village: Village of Mount Horeb
Village Administrator
138 East Main Street
Mount Horeb, WI 53572
Email: gabe.altenbernd@mounthorebwi.info
3
Page 15 of 251
To Applicant:
Email:
7. Severability. If any provision of this Agreement is deemed invalid, then the invalidity
of said provision shall not affect the validity of any other provision hereof.
8. A
mendment, Withdrawal, or Release. This Agreement may be withdrawn, amended or
released only by a written document duly executed by both parties.
9. E
ffective Date. This Agreement shall be effective commencing on the date indicated
in the first paragraph above.
I
N WITNESS WHEREOF, the parties have caused this Agreement to be executed by
the duly authorized individuals and officers below.
VILLAGE OF MOUNT HOREB
By: ______________________
Village Administrator Gabe Altenbernd
APPLICANT
By:
Print name:
Title:
4
Owner/Developer
Page 16 of 251
LANGHUS ON MAIN
DATE: 09/30/26
SUBMITTAL
Page 17 of 251
E
OHE
OHE
OHE
OHE
OHE
OHE
OHEOHEOHE
OHEOHE
OHEOHE
OHEOHE
OHEOHEOHE
OHEOHE
OHEOHE
OHEOHEOHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHEOHEOHEOHE
EEE
EEE
E
E
E
E
E
E
E E
E E E E E E E E E E E E E
E E E E E E
E
E
SANSAN
9082 SFCOMMERCIAL SPACE17843 SFPARKING GARAGE
7.2'4.0'
14.0'
14.0' 2.70'0.99'
1.10'4.97'5.94'
6.47'
6.40'
6.40'
2.04'
4.9'
LANGHUS ON MAINVILLAGE OF MOUNT HOREB, DANE COUNTY, WI
C100
SITE INFORMATION BLOCK:SITE ADDRESS: 208-220 EAST MAIN STREETSITE ACREAGE: 0.73 AC (31,653 SQ.FT.)USE OF PROPERTY: MIXED-USE (RESIDENTIAL APARTMENTS/COMMERCIAL)ZONING: CENTRAL BUSINESS (CB)SETBACKS: ZERO FEET FOR ALL SIDESMAXIMUM BUILDING HEIGHT: 50'-0" (MINIMUM 20'-0") - 37'11.75" PROPOSEDTOTAL NUMBER OF PARKING STALLS: 55NUMBER OF STALLS DESIGNATED ACCESSIBLE: 2NO MINIMUM PARKING REQUIREDTOTAL NUMBER OF BIKE STALLS: 12EXISTING IMPERVIOUS SURFACE AREA: 10,588 SQ.FT. (12,790 SQ.FT.INCLUDING AREA REMOVED IN 2021)ROOFTOP: 5,301 SQ.FT.AREA REMOVED IN 2021: 1,850 SQ.FT.PAVED: 5,287 SQ.FT.AREA REMOVED IN 2021: 352 SQ.FT.FINAL PROPOSED IMPERVIOUS SURFACE AREA: 30,900 SQ.FT.
LEGEND (PROPOSED)
PROPOSED BUILDING28,500 SQ.FT.
EAST MAIN STREET
COMMERCIAL ENTRANCE PERTHE VILLAGE OF MOUNTHOREB REQUIREMENTS.
PROPOSED PROPERTY BOUNDARYEASEMENTBUILDING FOOTPRINTCONCRETE PAVEMENT
NORTH THIRD STREET
OVERALL PARCEL31,653 SQ. FT.OR 0.73 ACRES
PUBLIC ALLEY16.5' RIGHT-OF-WAYRIBBON CURB
CAP EXISTING WATER SERVICEAT THE MAIN. COORDINATIONCONNECTION WITH VILLAGE OFMOUNT HOREB MAIN STREETRECONSTRUCTION PROJECT.
RETAINING WALL WITHRAILING ALONG THEGRADE CHANGEBETWEEN PUBLIC ANDPRIVATE SIDEWALK.
EXISTING PARKING STALLSADJACENT TO THECOMMERCIAL ENTRY TO BEREMOVED.
RECONSTRUCT THE PUBLIC SIDEWALK.5" CONCRETE OVER 6" DGB. STREETTREES AND GRATES, LIGHT POLES, ANDPAVERS TO REMAIN IN PLACE. REPLACEIN KIND IF REQUIRED DUE TOCONSTRUCTION ACTIVITIES.RELOCATE PUBLIC SIDEWALK RAMP TOALIGN WITH EXISTING CROSSWALKLOCATION.
RECONSTRUCT THE PUBLIC SIDEWALKWITH SMALLER TERRACE WIDTH.2.5' WIDE PUBLIC SIDEWALK EASEMENT.
4.5' WIDE PUBLIC SIDEWALK EASEMENT.
RECONSTRUCT SOUTH HALF OF THEALLEY DRIVEWAY ENTRY.RECONSTRUCT THE SOUTH HALF OFTHE ALLEY. 4.0" ASPHALT OVER 12"DGB.
INSTALL NEW STORM SEWER TO ALLEY.COORDINATE CONNECTION WITHVILLAGE OF MOUNT HOREB MAINSTREET RECONSTRUCTION PROJECT.
2.5' WIDE PUBLIC SIDEWALK EASEMENT.
COORDINATION UTILITY WORK WITHVILLAGE OF MOUNT HOREB MAINSTREET RECONSTRUCTION PROJECT TOMINIMIZE STREET CLOSURES ANDPAVEMENT PATCHING.
Page 18 of 251
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
GASGASGASGAS GASGAS
GASGAS
GAS
GAS
GASGASGAS
GAS
GASCOMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMMGAS
GAS
GAS
GAS
GASGASGASGAS
GAS
GAS
GAS
GAS
GASGAS
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMMCOMMCOMMCOMMCOMM
COMMCOMMCOMMCOMMCOMMCOMMCOMMCOMM
COMMCOMM
COMM
COMM
EEEGASGAS
GAS
GAS
GAS
OHEOHE
AC
AC
AC
EMEMGM
GM
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHEOHE
OHEOHEOHE
OHEOHE
OHEOHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHEOHE
EEEE
EEE
E
E E E E E E E E E
E
WATWATWATWATWAT
WATWAT
WATWATWATWAT
WAT
WAT
WAT
WAT
WAT
WATWATWATWATWATWATWATWATWATWATWATWATWATWAT
SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN
SANSANSAN
SAN
SAN
SAN
SANSANSANSANSAN
SANSANSANSANSANSANSANSANSANSANSANSANSANSANWAT
WAT
WATWATWATWAT
WATWATWATWAT 1251125012491248
1253
12531252
1252
125112471246
12461247124912501251
1246124712481249
STM
STMSTM
STM
STMSTMSTMSTMSTMSTMSTM
STMSTMSTM
STM
STMSTMSTM
LOT 1CSM NO. 1617
LANGHUS ON MAINVILLAGE OF MOUNT HOREB, DANE COUNTY, WI
Hearing Impaired TDD (800) 542-2289C101
GENERAL NOTES
LEGEND (PROPOSED)
1.THIS PLAN INDICATES ITEMS ON THE SITE, NOT INCLUDINGINTERNAL BUILDING DEMOLITION, INTENDED FORDEMOLITION BASED ON THE CURRENT SITE DESIGN THATHAVE BEEN IDENTIFIED BY A REASONABLE OBSERVATION OFTHE EXISTING CONDITIONS THROUGH FIELD SURVEYRECONNAISSANCE (BY OTHERS), "DIGGER'S HOTLINE"LOCATION, AND GENERAL "STANDARD OF CARE". THERE MAYBE ADDITIONAL ITEMS THAT CAN NOT BE IDENTIFIED BY AREASONABLE ABOVE GROUND OBSERVATION, WHERE NOTINCLUDED WITHIN THE FIELD SURVEY, OF WHICH THEENGINEER WOULD HAVE NO KNOWLEDGE OR MAY BE A PARTOF ANOTHER DESIGN DISCIPLINE. IT IS THE CONTRACTOR'S /BIDDER'S RESPONSIBILITY TO REVIEW THE PLANS, INSPECTTHE SITE AND PROVIDE HIS OWN DUE DILIGENCE TO INCLUDEIN HIS BID WHAT ADDITIONAL ITEMS, IN HIS OPINION, MAY BENECESSARY FOR DEMOLITION. ANY ADDITIONAL ITEMSIDENTIFIED BY THE CONTRACTOR / BIDDER SHALL BEIDENTIFIED IN THE BID AND REPORTED TO THE OWNER ANDENGINEER OF RECORD. WYSER ENGINEERING TAKES NORESPONSIBILITY FOR ITEMS ON THE PROPERTY THAT COULDNOT BE LOCATED BY A REASONABLE OBSERVATION OF THEPROPERTY OR OF WHICH THEY WOULD HAVE NO KNOWLEDGE.2.PRIOR TO CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLEFOR:2.1.EXAMINING ALL SITE CONDITIONS RELATIVE TO THECONDITIONS INDICATED ON THE ENGINEERING DRAWINGS.ANY DISCREPANCIES ARE TO BE REPORTED TO THE OWNERAND ENGINEER AND RESOLVED PRIOR TO THE START OFCONSTRUCTION.2.2.VERIFYING UTILITY ELEVATIONS AND NOTIFYING OWNERAND ENGINEER OR ANY DISCREPANCIES. NO WORK SHALLBE PERFORMED UNTIL THE DISCREPANCIES ARERESOLVED.
2.3.NOTIFYING ALL UTILITIES PRIOR TO THE REMOVAL OF ANYUNDERGROUND UTILITIES.2.4.NOTIFYING THE OWNER, DESIGN ENGINEER AND LOCALCONTROLLING MUNICIPALITY 48 HOURS PRIOR TO THESTART OF CONSTRUCTION TO ARRANGE FOR APPROPRIATECONSTRUCTION INSPECTION.3.CONTRACTOR IS SOLELY RESPONSIBLE FOR SITE SAFETYDURING THE CONSTRUCTION OF THESE IMPROVEMENTS.4.CONTRACTOR SHALL KEEP ALL STREETS AND ADJOININGSHARED ACCESS ROADWAYS FREE AND CLEAR OF ALLCONSTRUCTION RELATED DIRT, DUST AND DEBRIS.5.ALL TREES WITHIN THE CONSTRUCTION LIMITS SHALL BEREMOVED UNLESS SPECIFICALLY CALLED OUT FORPROTECTION. ALL TREES TO BE REMOVED SHALL BE REMOVEDIN THEIR ENTIRETY. STUMPS SHALL BE GROUND TOPROPOSED SUBGRADE.6.PERFORM TREE PRUNING IN ALL LOCATIONS WHEREPROPOSED PAVEMENT AND / OR UTILITY INSTALLATIONENCROACH WITHIN THE EXISTING DRIP LINE OF THE TREES TOREMAIN. ALL TRENCHING WITHIN THE EXISTING DRIP LINE OFTHE TREES TO REMAIN SHALL BE DONE RADIALLY AWAY FROMTHE TRUNK IF ROOTS IN EXCESS OF 1" DIAMETER AREEXPOSED. ROOTS MUST BE CUT BY REPUTABLE TREEPRUNING SERVICE PRIOR TO ANY TRANSVERSE TRENCHING.7.ALL LIGHT POLES TO BE REMOVED SHALL BE REMOVED INTHEIR ENTIRETY, INCLUDING BASE AND ALL APPURTENANCES.SALVAGE FOR RELOCATION. COORDINATE RELOCATION AND /OR ABANDONMENT OF ALL ELECTRIC LINES WITH ELECTRICALENGINEER AND OWNER PRIOR TO DEMOLITION.
8.CONTRACTOR SHALL COORDINATE PRIVATE UTILITY REMOVAL/ ABANDONMENT AND NECESSARY RELOCATIONS WITHRESPECTIVE UTILITY COMPANY. COORDINATION REQUIREDPRIOR TO CONSTRUCTION.9.ABANDONED / REMOVED ITEMS SHALL BE DISPOSED OF OFFSITE UNLESS OTHERWISE NOTED.10.THE CONTRACTOR SHALL INSTALL A PEDESTRIAN FENCEAROUND ALL EXCAVATIONS TO BE LEFT OPEN OVERNIGHT ASREQUIRED.11.CONTRACTOR TO REMOVE EXISTING UTILITY PIPE ANDBACKFILL WITH SELECT FILL OR PROVIDE PIPE BACK-FILLINGWITHIN BUILDING FOOTPRINT USING "LOW DENSITYCONCRETE / FLOWABLE FILL".12.GRANULAR BACKFILL MATERIALS ARE REQUIRED FOR FILLUNDER PROPOSED PAVED AREAS.13.RESTORATION OF THE EXISTING RIGHT-OF-WAYS AS NEEDEDARE CONSIDERED INCIDENTAL AND SHOULD BE PART OF THECOST OF THE UNDERGROUND IMPROVEMENTS, DEMOLITIONAND REMOVAL. THIS INCLUDES, BUT IS NOT LIMITED TO, CURB& GUTTER, SIDEWALK, TOPSOIL, SEEDING AND MULCHING.14.ANY SANITARY SEWER, SANITARY SEWER SERVICES, WATERMAIN, WATER SERVICES, STORM SEWER, OR OTHER UTILITIES,WHICH ARE DAMAGED BY THE CONTRACTORS, SHALL BEREPAIRED TO THE OWNER'S SATISFACTION AT THECONTRACTOR'S EXPENSE.
DEMOLITION NOTES
SUBJECT PARCEL PROPERTY LINECONSTRUCTION LIMIT LINENEW BUILDING (FOR REFERENCE)SAWCUT LIMITSFULL SECTION ASPHALT REMOVAL AREACONCRETE REMOVAL AREACURB AND GUTTER REMOVALTREE REMOVAL
NOTE: CAPPING AND ABANDONMENT OFEXISTING UTILIES AND CUTTING IN NEWUTILITIES WITHIN MAIN STREET TO BECOORDINATED WITH THE UPCOMINGPUBLIC IMPROVEMENT PLAN FORRECONSTRUCTION OF MAIN STREET. NODEMOLITION OF THESE IS SHOWN DUETO THE ASSUMED TIMING WITH THEPUBLIC IMPROVEMENT PROJECT.
1.UNDERLYING SITE CONTOURS AND INFORMATION BASED ON TOPOGRAPHIC & UTILITY DATA ASSURVEYED BY WYSER ENGINEERING ON THE WEEK OF MAY 27, 2025. WYSER ENGINEERING SHALL NOTBE HELD RESPONSIBLE FOR ANY ERRORS OR OMISSIONS THAT MAY ARISE AS A RESULT OF ERRONEOUSOR INCOMPLETE INFORMATION PROVIDED BY OTHERS. CONTRACTOR TO CONFIRM ALL ELEVATIONS,GENERAL DRAINAGE AND EARTHWORK REQUIREMENTS PRIOR TO CONSTRUCTION.2.THE BENCHMARK LOCATIONS ARE SHOWN FOR REFERENCE ONLY ON THIS PLAN. THE BENCHMARKSSHALL BE VALIDATED BY LICENSED LAND SURVEYOR PRIOR TO CONSTRUCTION. CONTRACTORASSUMES RISK ASSOCIATED WITH BENCHMARK ELEVATIONS UNTIL CONFIRMED.3.CONTRACTOR TO OBTAIN APPROPRIATE PERMITS FOR STREET OPENINGS & TO WORK WITHIN THEVILLAGE'S LAND IF REQUIRED.4.WYSER ENGINEERING SHALL BE HELD HARMLESS AND DOES NOT WARRANT ANY DEVIATIONS BY THEOWNER OR CONTRACTOR FROM THE APPROVED CONSTRUCTION PLANS THAT MAY RESULT INDISCIPLINARY ACTIONS BY REGULATORY AGENCIES.5.IF ANY ERRORS, DISCREPANCIES, OR OMISSIONS WITHIN THE PLAN BECOME APPARENT, IT SHALL BEBROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO CONSTRUCTION SO THAT CLARIFICATION ORREDESIGN MAY OCCUR.6.ALL MUNICIPAL UTILITY CONNECTIONS, WORK IN ROW, PUBLIC OUTLOTS AND PUBLIC EASEMENTSSHALL BE IN ACCORDANCE WITH VILLAGE OF MOUNT HOREB STANDARD SPECIFICATIONS.
EXISTING PAVERS, TREE GRATES, ANDTREES ARE TO REMAIN. THE CONCRETESIDEWALK IS TO BE REMOVED. THECONTRACTOR IS REQUIRED TO PROVIDEA PLAN FOR TEMPORARY SIDEWALKCLOSURE DURING CONSTRUCTION.
ALL IMPROVEMENTS AND UTILITIESWITHIN THE PARCEL AREA ARE TO BEREMOVED IN THERE ENTIRETY. NOIMPROVEMENTS TO BE LEFTABANDONED BELOW GRADE. CAP ALLEXISTING UTILITIES AT THE PROPERTYLINE OR AS REQUIRED BY THE VILLAGE.
POWER POLES AND ASSOCIATEDOVERHEAD ELECTRIC LINES TO BEREMOVED AND BURIED BELOW GRADE.CONTRACTOR TO COORDINATE WITHTHE APPROPRIATE UTILITYCOMPANIES.
COMMUNICATION LINES AFFECTED BYCONSTRUCTION ACTIVITIES TO BERELOCATED AS NEEDED. CONTRACTORTO COORDINATE WITH THEAPPROPRIATE UTILITY COMPANIES.
REMOVE PUBLIC STREET ASREQUIRED FOR NEW PUBLIC STORMSEWER EXTENSION.
Page 19 of 251
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
GASGASGAS
GAS
GAS
GASGASGAS
GASGASGAS
GAS
GAS
GAS
GAS
GAS
GAS
GASGASGASGASGAS
GAS
GAS
GAS
GAS
GAS
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMMGAS
GAS
GAS
GAS
GASGASGASGAS
GAS
GAS
GAS
GAS
GASGASGASGAS
GAS
GAS
GAS
GAS
GASGASGASGAS
GAS
GAS
GAS
GAS
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMMCOMMCOMM
COMM
COMM
COMM
COMM
COMM
E
GAS
GAS
GAS
GAS
GAS
GAS
OHE
OHE
OHE
OHE
OHE
OHE
OHEOHE
OHEOHEOHE
OHEOHE
OHEOHE
OHEOHEOHE
OHEOHE
OHEOHE
OHEOHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHEOHEOHEOHE
EEEEE
E
E
E
E
E
E
E
E
E E E E E E E E E E E E E E E E E E E
E
E
WAT
WATWAT
WAT
WATWATWATWATWATWATWAT
WATWAT
WAT
WATWAT
WATWATWATWATWAT
WATWATWATWATWATWATWATWAT
WAT
WAT
WAT
WAT
WATWATWATWAT
WAT
WAT
WAT
WAT
WATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWAT
SANSANSAN
SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN
SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN
SAN
SAN
SANSANSAN
SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN
WAT
WAT
WAT
WAT
WATWATWATWATWATWATWATWAT
WATWATWATWATWATWATWATWAT
SANSAN
STM
STM
STM
STM
STMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTM
STM
STM
STM
9082 SFCOMMERCIAL SPACE17843 SFPARKING GARAGE245'-10"
117'-0"
WATWATWATWATWAT
SANSAN
STMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTM
STM
STM
STMSTMSTMSTMSTMSTM
STM
STM
STMSTMSTMSTMSTMSTMSTMSTMSTMSTM
STM
STM
STM
STMSTMSTMSTM
STM
1247
1246
12461247124812491250 1251 1252
1253
1254
LANGHUS ON MAINVILLAGE OF MOUNT HOREB, DANE COUNTY, WI
Hearing Impaired TDD (800) 542-2289C200
PERIMETER CONTORL PER WDNRTECHNICAL STANDARD 1056
STONE TRACKING PAD (MIN. 50'LONG AND 12" DEEP BY USE OF 3"CLEAR STONE) IN THIS AREA PERWDNR TECHNICAL STANDARD 1057.INSTALL AT ANY LOCATION WHERECONSTRUCTION TRAFFIC MEETSTHE EXISTING PAVEDDEVELOPMENT AREA.
TYPE D INLET PROTECTION PERWDNR TECHNICAL STANDARD 1060,TYP. INSTALL AT ANY LOCATIONWHERE CONSTRUCTION RUNOFFDRAINS INTO THE STORM SEWERSYSTEM.
PUBLIC ALLEY
EAST MAIN STREET
NORTH THIRD STREET
PROPOSED BUILDINGFFE = 1246.93-1252.8
FLOOR ELEVATION1246.93 (ARC 100'-0")COORDINATE CHANGE AT DOORELEVATIONS WITH ARCHITECTURALPLANS
PARKING FLOOR ELEVATION VARIES1250.66 - 1252.80
Page 20 of 251
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
GASGASGAS
GAS
GAS
GASGASGAS
GASGASGAS
GAS
GAS
GAS
GAS
GAS
GAS
GASGASGASGASGAS
GAS
GAS
GAS
GAS
GAS
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMMGAS
GAS
GAS
GAS
GASGASGASGAS
GAS
GAS
GAS
GASGASGASGASGAS
GAS
GAS
GAS
GASGASGASGAS
GAS
GAS
GAS
GAS
GAS
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMMCOMMCOMMCOMM
COMM
COMM
COMM
COMM
E
GAS
GAS
GAS
GAS
GAS
GAS
OHE
OHE
OHE
OHE
OHE
OHE
OHEOHEOHEOHEOHE
OHEOHE
OHEOHE
OHEOHEOHE
OHEOHE
OHEOHE
OHEOHEOHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHEOHEOHEOHE
EEEEE
E
E
E
E
E
E
E
E
E E E E E E E E E E E E E E E E E E E
E
E
WATWAT
WATWAT
WATWATWATWATWATWATWAT
WAT
WATWAT
WAT
WAT
WATWATWATWAT
WATWATWATWATWAT
WAT
WAT
WAT
WATWATWATWAT
WAT
WAT
WAT
WAT
WATWATWATWAT
WAT
WATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWATWAT
SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN
SAN
SAN
SANSANSAN
SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN
WAT
WATWAT
WAT
WATWATWATWATWATWATWATWAT
WATWATWATWATWATWATWATWAT
SANSAN
STM
STM
STM
STM
STMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTM
STM
STM
STM
9082 SFCOMMERCIAL SPACE17843 SFPARKING GARAGE245'-10"
117'-0"
1247.30 SW
1246.82 SW
1246.21 SW
1246.01 SW
1245.78 SW
1245.72 SW
1245.18 SW
1245.78 BC1246.19 BC1247.37 BC1248.06 BC1248.44 BC1249.76 EP
1252.45 SW
1250.47 EP1251.86 EP
1252.52 EP
1253.26 EP
1253.53 EP
1253.06 EP
1252.61 EP
WATWATWATWATWAT
SANSAN
1245.00 EP1244.90 EP
1245.22 SW
STMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTM
STM
STM
STMSTMSTMSTMSTMSTM
STM
STM
STMSTMSTMSTMSTMSTMSTMSTMSTMSTM
STM
STM
STM
STMSTMSTMSTM
1247.82 BC 1251.56 BC
1.0%
1250.66 EC1250.66 EC
2.0%1253.41 EP1253.35 FL
2.0%1253.15 EP1253.09 FL
0.57%1.63%
1252.43 EP1252.37 FL1251.70 SW
1251.64 SW
1.0%1253.00 EP1252.94 FL
0.57%
1252.57 EP1252.51 FL
2.0%
0.5%0.47%
1248.0 FG1247.5 FG
1252.67 EP1252.61 FL1252.69 EP1252.63 FL5.0%1252.80DOOR4.23%
1252.80DOOR
1252.80DOOR1252.75 EP1252.69 FL2.0%
1250.4 FG
1252.8 FG
1246.32DOOR
1245.89DOOR
1245.83DOOR
1245.45DOOR 1248.02DOOR
1250.48 SW10.0%1250.55 SW1.0%1250.56 SW1250.61 SW
2.0%
1.0%
1250.66DOOR
1248.13 SW1250.56 EC1248.19 SW2.0%1250.66DOOR
1250.66DOOR
1245.06 SW8.0%1245.14 SW2.8%1245.20 SW1245.96 SW1246.02 SW1245.39 EC7.35%5.0%
1245.30 SW1245.22 SW
1245.20 SW
1245.26DOOR
3.0%0.5%
1247.81 EC1247.50 SW1247.95 EC1247.95 SW1.0%3.0%
1247.44 SW1247.89 SW8.14% 1252.19 SW1252.25 SW5.0%7.47%1248.51 SW1250.56 EC1248.57 SW1250.66 EC1250.61 SW
1246.12DOOR
1246.93DOOR
1250.55 SW
1252.86 EP1252.80 FL
STM1.15%12.08%12.70% 0.5%
1247
1246
12461247124812491250 1251 1252
1253
1254
LANGHUS ON MAINVILLAGE OF MOUNT HOREB, DANE COUNTY, WI
Hearing Impaired TDD (800) 542-2289C201
NOTE:SPOT GRADES ARE AS FOLLOWS: FFE - FINISHED FLOOR GRADE EP - EDGE OF ASPHALT PAVEMENT EC - EDGE OF CONCRETE PAVEMENT BC - BACK OF CURB SW - EDGE OF SIDEWALK FG - FINISH GRADE TW - FINISH GRADE ADJACENT TOP OF WALL BW - FINISH GRADE ADJACENT BOTTOM OFWALL (NOT FOOTING)
PROPOSED BUILDING
OVERALL PARCEL31,653 SQ. FT.OR 0.73 ACRES
PUBLIC ALLEY16.5' RIGHT-OF-WAY
PARKING FLOOR ELEVATION VARIES1250.66 - 1252.80
RIBBON CURB
EAST MAIN STREET
NORTH THIRD STREETFLOOR ELEVATION1246.93 (ARC 100'-0")COORDINATE CHANGE AT DOORELEVATIONS WITH ARCHITECTURALPLANS
Page 21 of 251
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
GASGASGASGAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GASCOMM
COMM
COMM
COMM
COMMCOMM
COMM
COMM
COMM
COMM
COMMGAS
GASGASGASGAS
GAS
GAS
GAS
GASGASGASGASGAS
GAS
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMMCOMMCOMM
COMM
COMM
GAS
GAS
GAS
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHEOHE
OHEOHEOHE
OHEOHE
OHEOHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHEOHE
EEEEEE
E
E
E E E E E E E
E E
E
WAT
WATWATWATWAT
WATWAT
WATWATWAT
WATWATWAT
WAT
WAT
WAT
WAT
WATWATWATWATWATWATWATWATWATWATWATWATWAT
SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN
SAN
SAN
SAN
SANSANSANSANSAN
SANSANSANSANSANSANSANSANSANSANSANSANSANSANWAT
WAT
WATWATWATWAT
WATWATWATWAT
STM
STMSTM
STM
STMSTMSTMSTMSTMSTMSTM
STMSTMSTM
STM
STMSTMSTM
9082 SFCOMMERCIAL SPACE17843 SFPARKING GARAGE
WATWAT
SAN
LOT 1CSM NO. 1617
STMSTMSTMSTMSTMSTM
STMSTMSTMSTMSTMSTMSTMSTMSTMSTM
STM
LANGHUS ON MAINVILLAGE OF MOUNT HOREB, DANE COUNTY, WI
Hearing Impaired TDD (800) 542-2289C300
81 LF OF 8"PVC @ 3.00%
280 LF OF 8" DUCTILE IRON PIPE
WARNING: ULO REQUIRED.COMMUNICATION LINE CROSSINGS INTHIS AREA. CONTRACTOR TOCOORDINATE RELOCATION OFEXISTING UTILITIES AS NEEDED TOALLOW FOR NEW PIPE AT THE DESIGNELEVATION.
NOTE: CURB INLET RIM ELEVATION IS TO EDGE OF PAVEMENT.
PROPOSED BUILDING
CAP EXISTING WATER SERVICE AT THEMAIN. COORDINATION CONNECTIONWITH VILLAGE OF MOUNT HOREB MAINSTREET RECONSTRUCTION PROJECT.
CAP EXISTING WATER SERVICEAT THE MAIN. COORDINATIONCONNECTION WITH VILLAGE OFMOUNT HOREB MAIN STREETRECONSTRUCTION PROJECT.
INSTALL NEW 6" SANITARY SERVICE TOBUILDING. EXISTING MAIN IS 8" VC PIPE.I.E. = 1039.2±. COORDINATIONCONNECTION WITH VILLAGE OF MOUNTHOREB MAIN STREET RECONSTRUCTIONPROJECT.
SANITARY BUILDINGCONNECTION LOCATIONI.E. = 1239.8COORDINATE WITH INTERIORPLUMBING PLANS.
INSTALL NEW 6" WATER SERVICE TOBUILDING. EXISTING MAIN IS 8" DI.COORDINATION CONNECTION WITHVILLAGE OF MOUNT HOREB MAINSTREET RECONSTRUCTION PROJECT.
INSTALL NEW STORM SEWER TO ALLEY.COORDINATE CONNECTION WITHVILLAGE OF MOUNT HOREB MAINSTREET RECONSTRUCTION PROJECT.
WARNING: ULO REQUIRED. GAS ANDWATER CROSSING IN THIS AREA.CONTRACTOR TO COORDINATERELOCATION OF EXISTING UTILITIES ASNEEDED TO ALLOW FOR NEW PIPE ATTHE DESIGN ELEVATION.
GAS SERVICE TO BE ABANDONED.COORDINATE WITH MG&E.
EAST MAIN STREET
NORTH THIRD STREETPUBLIC ALLEY16.5' RIGHT-OF-WAY
POWER POLES AND ASSOCIATEDOVERHEAD LINES TO BE PLACEDBELOW GRADE. COMMUNICATIONBOXES TO BE PLACED AT GRADE.TYP. TO ALL ALONG ALLEYADJACENT TO PROJECT
PUBLIC STM MH NO. 1R-1550 SOLID LIDRIM EL. = 1245.63SE I.E. = 1241.2± (EX 12" RCP)NW I.E. = 1241.2± (EX 12" RCP)NE I.E. = 1241.29 (12" RCP)
PUBLIC STMMH NO. 2PUBLIC STMINL NO. 3 PUBLIC STMINL NO. 4
PUBLIC P - 3
PUBLIC P - 1
PUBLIC P - 2RD - 1 RD - 2
RD - 3
PROPOSED LOCATIONFOR GAS METERS
ELECTRIC ROOMLOCATION
FLOOR ELEVATION1246.93 (ARC 100'-0")COORDINATE CHANGE AT DOORELEVATIONS WITH ARCHITECTURALPLANSSTORM BUILDINGCONNECTION LOCATIONI.E. = 1242.75COORDINATE WITH INTERIORPLUMBING PLANS.
STORM BUILDINGCONNECTION LOCATIONI.E. = 1248.35COORDINATE WITH INTERIORPLUMBING PLANS. STORM BUILDINGCONNECTION LOCATIONI.E. = 1250.01COORDINATE WITH INTERIORPLUMBING PLANS.PARKING FLOOR ELEVATION VARIES1250.66 - 1252.80
Page 22 of 251
LANGHUS ON MAINVILLAGE OF MOUNT HOREB, DANE COUNTY, WI
C400
LEGEND (PROPOSED)PROPERTY BOUNDARYEASEMENTBUILDING FOOTPRINTRIBBON CURBASPHALT PAVEMENTCONCRETE PAVEMENTPROPOSED MAJOR CONTOURPROPOSED MINOR CONTOURPROPOSED STORM SEWERPROPOSED WATER MAINPROPOSED SANITARY SEWERPROPOSED GAS SERVICE (DESIGN BY OTHERS)PROPOSED ELECTRIC SERVICE (DESIGN BY OTHERS)SILT SOCKINLET PROTECTIONSPOT GRADEDRAINAGE GRADE BREAKDRAINAGE ARROW
11811180STM
GENERAL NOTES1.UNDERLYING SITE CONTOURS AND INFORMATION BASED ON TOPOGRAPHIC & UTILITYDATA AS SURVEYED BY WYSER ENGINEERING ON THE WEEK OF MAY 27, 2025. WYSERENGINEERING SHALL NOT BE HELD RESPONSIBLE FOR ANY ERRORS OR OMISSIONSTHAT MAY ARISE AS A RESULT OF ERRONEOUS OR INCOMPLETE INFORMATIONPROVIDED BY OTHERS. CONTRACTOR TO CONFIRM ALL ELEVATIONS, GENERALDRAINAGE AND EARTHWORK REQUIREMENTS PRIOR TO CONSTRUCTION.2.THE BENCHMARK LOCATIONS ARE SHOWN FOR REFERENCE ONLY ON THIS PLAN. THEBENCHMARKS SHALL BE VALIDATED BY LICENSED LAND SURVEYOR PRIOR TOCONSTRUCTION. CONTRACTOR ASSUMES RISK ASSOCIATED WITH BENCHMARKELEVATIONS UNTIL CONFIRMED.3.CONTRACTOR TO OBTAIN APPROPRIATE PERMITS FOR STREET OPENINGS & TO WORKWITHIN THE VILLAGE'S LAND IF REQUIRED.4.WYSER ENGINEERING SHALL BE HELD HARMLESS AND DOES NOT WARRANT ANYDEVIATIONS BY THE OWNER OR CONTRACTOR FROM THE APPROVED CONSTRUCTIONPLANS THAT MAY RESULT IN DISCIPLINARY ACTIONS BY REGULATORY AGENCIES.5.IF ANY ERRORS, DISCREPANCIES, OR OMISSIONS WITHIN THE PLAN BECOMEAPPARENT, IT SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TOCONSTRUCTION SO THAT CLARIFICATION OR REDESIGN MAY OCCUR.6.ALL MUNICIPAL UTILITY CONNECTIONS, WORK IN ROW, PUBLIC OUTLOTS AND PUBLICEASEMENTS SHALL BE IN ACCORDANCE WITH VILLAGE OF MOUNT HOREB STANDARDSPECIFICATIONS.
WATSANGASE
1.POST MUNICIPAL EROSION CONTROL PERMITS ON SITE AND MAINTAIN UNTIL CONSTRUCTION ACTIVITIES HAVE CEASED, THE SITE ISSTABILIZED, AND A NOTICE OF TERMINATION IS FILED WITH MUNICIPALITY.2.KEEP A COPY OF THE CURRENT EROSION CONTROL PLAN ON SITE THROUGHOUT THE DURATION OF THE PROJECT.3.ENGINEER / VILLAGE OF MOUNT HOREB HAS THE RIGHT TO REQUIRE CONTRACTOR TO IMPLEMENT ADDITIONAL EROSION CONTROLMEASURES AS NECESSARY.CONTRACTOR MUST NOTIFY THE VILLAGE OF MOUNT HOREB BUILDING INSPECTOR TWO (2) WORKING DAYSIN ADVANCE OF ANY SOIL DISTURBANCE ACTIVITIES.4.SUBMIT PLAN REVISIONS OR AMENDMENTS TO THE VILLAGE AT LEAST 5 DAYS PRIOR TO FIELD IMPLEMENTATION.5.THE SITE CONTRACTOR IS RESPONSIBLE FOR ROUTINE SITE INSPECTIONS AT LEAST ONCE EVERY 7 DAYS AND WITHIN 24 HOURS AFTERA RAINFALL EVENT OF 0.5 INCHES OR GREATER. KEEP INSPECTION REPORTS ON-SITE AND MAKE THEM AVAILABLE UPON REQUEST.6.INSPECT AND MAINTAIN ALL INSTALLED EROSION CONTROL PRACTICES UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEENSTABILIZED.7.WHEN POSSIBLE: PRESERVE EXISTING VEGETATION (ESPECIALLY ADJACENT TO SURFACE WATERS), MINIMIZE LAND-DISTURBINGCONSTRUCTION ACTIVITY ON SLOPES OF 20% OR MORE, MINIMIZE SOIL COMPACTION, AND PRESERVE TOPSOIL.8.REFER TO THE WDNR STORMWATER CONSTRUCTION TECHNICAL STANDARDS AThttp://dnr.wi.gov/topic/stormwater/standards/const_standards.html. 9.INSTALL PERIMETER EROSION CONTROLS AND ROCK TRACKING PAD CONSTRUCTION ENTRANCE(S) PRIOR TO ANY LAND-DISTURBINGACTIVITIES, INCLUDING CLEARING AND GRUBBING. USE WDNR TECHNICAL STANDARD STONE TRACKING PAD AND TIRE WASHING #1057FOR ROCK CONSTRUCTION ENTRANCE(S).10.INSTALL INLET PROTECTION PRIOR TO LAND-DISTURBING ACTIVITIES IN THE CONTRIBUTING DRAINAGE AREA AND/OR IMMEDIATELYUPON INLET INSTALLATION. COMPLY WITH WDNR TECHNICAL STANDARD STORM DRAIN INLET PROTECTION FOR CONSTRUCTION SITES#1060 AND DANE COUNTY REQUIREMENTS FOR FRAMED INLET PROTECTION.11.CONTRACTOR TO PROVIDE SOLID LID OR METAL PLATE ON ALL OPEN MANHOLES DURING CONSTRUCTION TO MINIMIZE SEDIMENTFROM ENTERING THE STORM SEWER SYSTEM.12.STAGE CONSTRUCTION GRADING ACTIVITIES TO MINIMIZE THE CUMULATIVE EXPOSED AREA. CONDUCT TEMPORARY GRADING FOREROSION CONTROL PER WDNR TECHNICAL STANDARD TEMPORARY GRADING PRACTICES FOR EROSION CONTROL #1067.13.PERMITTING OF GROUNDWATER DEWATERING IS THE RESPONSIBILITY OF THE CONTRACTOR. GROUNDWATER DEWATERING IS SUBJECTTO A DNR WASTEWATER DISCHARGE PERMIT AND A DNR HIGH CAPACITY WELL APPROVAL IF CUMULATIVE PUMP CAPACITY IS 70 GPMOR MORE.14.PROVIDE ANTI-SCOUR PROTECTION AND MAINTAIN NON-EROSIVE FLOW DURING DEWATERING. PERFORM DEWATERING OFACCUMULATED SURFACE RUNOFF IN ACCORDANCE WITH WDNR TECHNICAL STANDARD DE-WATERING #1061.15.INSTALL AND MAINTAIN SILT FENCING PER WDNR TECHNICAL STANDARD SILT FENCE #1056. REMOVE SEDIMENT FROM BEHIND SILTFENCES AND SEDIMENT BARRIERS BEFORE SEDIMENT REACHES A DEPTH THAT IS EQUAL TO ONE-HALF OF THE FENCE AND/ORBARRIER HEIGHT.
16.REPAIR BREAKS AND GAPS IN SILT FENCES AND BARRIERS IMMEDIATELY. REPLACE DECOMPOSING STRAW BALES (TYPICAL BALE LIFEIS 3 MONTHS). LOCATE, INSTALL, AND MAINTAIN STRAW BALES PER WDNR TECHNICAL STANDARD DITCH CHECKS #1062.17.INSTALL AND MAINTAIN FILTER SOCKS IN ACCORDANCE WITH WDNR TECHNICAL STANDARD INTERIM MANUFACTURED PERIMETERCONTROL AND SLOPE INTERRUPTION PRODUCTS # 1071.18.IMMEDIATELY STABILIZE STOCKPILES AND SURROUND STOCKPILES AS NEEDED WITH SILT FENCE OR OTHER PERIMETER CONTROL IFSTOCKPILES WILL REMAIN INACTIVE FOR 7 DAYS OR LONGER.19.IMMEDIATELY STABILIZE ALL DISTURBED AREAS THAT WILL REMAIN INACTIVE FOR 14 DAYS OR LONGER. BETWEEN SEPTEMBER 15 ANDOCTOBER 15: STABILIZE WITH MULCH, TACKIFIER, AND A PERENNIAL SEED MIXED WITH WINTER WHEAT, ANNUAL OATS, OR ANNUALRYE, AS APPROPRIATE FOR REGION AND SOIL TYPE OCTOBER 15 THROUGH COLD WEATHER: STABILIZE WITH A POLYMER ANDDORMANT SEED MIX, AS APPROPRIATE FOR REGION AND SOIL TYPE.20.STABILIZE AREAS OF FINAL GRADING WITHIN 7 DAYS OF REACHING FINAL GRADE.21.SWEEP/CLEAN UP ALL SEDIMENT/TRASH THAT MOVES OFF-SITE DUE TO CONSTRUCTION ACTIVITY OR STORM EVENTS BEFORE THEEND OF THE SAME WORKDAY OR AS DIRECTED BY THE AUTHORITIES WITH JURISDICTION. SEPARATE SWEPT MATERIALS (SOILS ANDTRASH) AND DISPOSE OF APPROPRIATELY.22.THE CONTRACTOR IS RESPONSIBLE FOR CONTROLLING DUST PER WDNR TECHNICAL STANDARD DUST CONTROL ON CONSTRUCTIONSITES # 1068.23.PROPERLY DISPOSE OF ALL WASTE AND UNUSED BUILDING MATERIALS (INCLUDING GARBAGE, DEBRIS, CLEANING WASTES, OR OTHERCONSTRUCTION MATERIALS) AND DO NOT ALLOW THESE MATERIALS TO BE CARRIED BY RUNOFF INTO THE RECEIVING CHANNEL.24.COORDINATE WITH THE AUTHORITIES WITH JURISDICTION TO UPDATE THE LAND DISTURBANCE PERMIT TO INDICATE THEANTICIPATED OR LIKELY DISPOSAL LOCATIONS FOR ANY EXCAVATED SOILS OR CONSTRUCTION DEBRIS THAT WILL BE HAULEDOFF-SITE FOR DISPOSAL. THE DEPOSITED OR STOCKPILED MATERIAL NEEDS TO INCLUDE PERIMETER SEDIMENT CONTROL MEASURES(SUCH AS SILT FENCE, HAY BALES, FILTER SOCKS, OR COMPACTED EARTHEN BERMS).25.FOR NON-CHANNELIZED FLOW ON DISTURBED OR CONSTRUCTED SLOPES, PROVIDE CLASS CLASS I TYPE B EROSION CONTROLMATTING. INSTALL AND MAINTAIN PER WDNR TECHNICAL STANDARD NON-CHANNEL EROSION MAT #1052.26.FOR CHANNELIZED FLOW ON DISTURBED OR CONSTRUCTED AREAS, PROVIDE CLASS II TYPE B EROSION CONTROL MATTING UNLESSOTHERWISE SPECIFIED ON THE PLAN. INSTALL AND MAINTAIN PER WDNR TECHNICAL STANDARD CHANNEL EROSION MAT #1053.27.MAKE PROVISIONS FOR WATERING DURING THE FIRST 8 WEEKS FOLLOWING SEEDING OR PLANTING OF DISTURBED AREAS WHENEVERMORE THAN 7 CONSECUTIVE DAYS OF DRY WEATHER OCCUR.28.THE CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL APPLICABLE WDNR REMEDIATION AND WASTE MANAGEMENTREQUIREMENTS FOR HANDLING AND DISPOSING OF CONTAMINATED MATERIALS. SITE-SPECIFIC INFORMATION FOR AREAS WITHKNOWN OR SUSPECTED SOIL AND/OR GROUNDWATER CONTAMINATION CAN BE FOUND ON WDNR'S BUREAU OF REMEDIATION ANDREDEVELOPMENT RACKING SYSTEM (BRRTS) PUBLIC DATABASE AT: http://dnr.wi.gov/botw/29.INSTALL AND MAINTAIN A CONCRETE WASHOUT BASIN PER EPA 833-F-11-006: https://www3.epa.gov/npdes/pubs/concretewashout.pdf. REQUIRE USE BY ALL CONCRETE CONTRACTORS. LIQUID MAY BE REUSED IN CONCRETE MIXING, EVAPORATED, OR DISPOSED OF ASWASTEWATER.
CONSTRUCTION SITE EROSION CONTROL REQUIREMENTS
EROSION CONTROL CONSTRUCTION SCHEDULE1.12/15/2025 - INITIAL LAND DISTURBING - INSTALL ALL PERIMETER EROSION CONTROL DEVICES INCLUDING STONETRACKING PAD AND SILT FENCE.2.12/15/2025 - BEGIN DEMOLITION. STRIP TOPSOIL AND STOCKPILE.3.02/15/2025 - BUILDING CONSTRUCTION.4.DURING CONSTRUCTION4.1.IF THE START DATE IS DELAYED, NOTIFIED AUTHORITIES HAVING JURISDICTION WHEN BREAKING GROUND.4.2.SOIL STOCKPILES WHICH ARE LEFT UNUSED FOR MORE THAN 7 DAYS SHALL BE STABILIZED AND SILT FENCEINSTALLED AROUND THE PILE.4.3.ALL SLOPES GREATER THAN 5:1 SHALL BE STABILIZED WITHIN TWO MONTHS (60 DAYS) OF BEING DISTURBED.4.4.INSTALL ADDITIONAL PRACTICES AS REQUIRED BY STATE AND LOCAL INSPECTORS AND AS NECESSARY TOPREVENT RUNOFF DUE TO CONSTRUCTION MEANS AND METHODS.4.5.ALL PRACTICES SHALL BE ONGOING BASED ON THE PLAN VIEW AND NOTES.5.06/15/2026 - TEMPORARY STABILIZATION WITH MULCH AND EROSION MATTING WHERE REQUIRED OUTSIDE OF ACTIVECONSTRUCTION AREAS.6.08/01/2027 - SITE PAVING AND FINISH GRADING.7.09/15/2027 - FINAL SITE STABILIZATION - ALL PERVIOUS AREAS DISTURBED DURING CONSTRUCTION WILL BERESTORED WITH A MINIMUM OF 6" OF TOPSOIL, FERTILIZER, SEED, AND MULCH WITHIN SEVEN (7) DAYS OF FINALGRADING.
1.ALL GRADES SHOWN ARE FINAL FINISHED SURFACE GRADES.2.AREAS TO BE SEEDED SHALL HAVE A MINIMUM 6 INCHES TOPSOIL UNLESS OTHERWISE NOTED.3.AREAS NOT RESTORED WITH EROSION MATTING OR OTHER STABILIZATION MEASURES SHALL BE STABILIZED WITHMULCH.4.APPLY ANIONIC POLYMER TO DISTURBED AREAS IF EROSION BECOMES PROBLEMATIC.5.MULCH SHALL BE WEED-FREE STRAW AND SHALL BE INSTALLED AT THE RATE OF 2 TONS PER ACRE PER SECTION 627OF "STANDARD SPECIFICATIONS FOR HIGHWAY AND STRUCTURE CONSTRUCTION" (WISDOT 2014)6.PERMANENT SEEDING SHALL NOT OCCUR BETWEEN SEPTEMBER 15TH AND APRIL 15TH. ALTERNATESEEDING/PLANTING METHODS AND/OR EROSION PROTECTION MAY BE NECESSARY FOR SEEDING/PLANTING THATOCCURS DURING THAT TIME. COORDINATE WITH THE OWNER AS NECESSARY.7.TEMPORARY STABILIZATION SHALL CONSIST OF ONE OR MORE OF THE FOLLOWING OPTIONS:a.TEMPORARY SEEDING CONSISTING OF ANNUAL RYE GRASS APPLIED AT A RATE OF 1.5 LBS PER 1000 SQUAREFEET,b.WISDOT PAL CLASS I TYPE B URBAN EROSION CONTROL MAT.
GRADING, SEEDING & RESTORATION NOTES
1.DIMENSIONS TAKE PRECEDENCE OVER SCALE. CONTRACTOR TO VERIFY ALL DIMENSIONS IN FIELD.2.LENGTHS OF ALL UTILITIES ARE TO CENTER OF STRUCTURES OR FITTINGS AND MAY VARY SLIGHTLYFROM PLAN. LENGTHS SHALL BE VERIFIED IN THE FIELD DURING CONSTRUCTION.3.CONTRACTOR SHALL VERIFY ALL ELEVATIONS, LOCATIONS, AND SIZES OF SANITARY, WATER ANDSTORM LATERALS AND CHECK ALL UTILITY CROSSINGS FOR CONFLICTS.4.THE PROPOSED IMPROVEMENTS MUST BE CONSTRUCTED IN ACCORDANCE WITH ENGINEERINGPLANS DESIGNED TO MEET ORDINANCES AND REQUIREMENTS OF THE MUNICIPALITY AND WISDOT,WISDSPS, AND WDNR.5.PRIOR TO CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE FOR:·EXAMINING ALL SITES CONDITIONS RELATIVE TO THE CONDITIONS INDICATED ON THEENGINEERING DRAWINGS. ANY DISCREPANCIES ARE TO BE REPORTED TO THE ENGINEER ANDRESOLVED PRIOR TO THE START OF CONSTRUCTION.·OBTAINING ALL PERMITS INCLUDING PERMIT COSTS, TAP FEES, METER DEPOSITS, BONDS, ANDALL OTHER FEES REQUIRED FOR PROPOSED WORK TO OBTAIN OCCUPANCY.·VERIFYING UTILITY ELEVATIONS AND NOTIFYING ENGINEER OF ANY DISCREPANCY. NO WORKSHALL BE PERFORMED UNTIL THE DISCREPANCY IS RESOLVED.·NOTIFYING ALL UTILITIES PRIOR TO THE INSTALLATION OF ANY UNDERGROUND IMPROVEMENTS.·NOTIFYING THE DESIGN ENGINEER AND MUNICIPALITY 48 HOURS PRIOR TO THE START OFCONSTRUCTION TO ARRANGE FOR APPROPRIATE CONSTRUCTION OBSERVATION.9.THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING THE ENGINEER WITH AS-BUILT CONDITIONS OFTHE DESIGNATED IMPROVEMENTS IN ORDER THAT THE APPROPRIATE DRAWINGS CAN BE PREPARED,IF REQUIRED. ANY CHANGES TO THE DRAWINGS OR ADDITIONAL ITEMS MUST BE REPORTED TO THEENGINEER AS WORK PROGRESSES.10.ANY SANITARY SEWER , SANITARY SEWER SERVICES, WATER MAIN, WATER SERVICES, STORM SEWER,OR OTHER UTILITIES, WHICH ARE DAMAGED BY THE CONTRACTORS, SHALL BE REPAIRED TO THEOWNER'S SATISFACTION AT THE CONTRACTOR'S EXPENSE.
NO BLASTING IS ALLOWED WITHIN 30
FEET OF EXISTING UTILITIES. 11.ALL PRIVATE INTERCEPTOR WATER MAIN AND WATER SERVICES SHALL BE INSTALLED WITH A 6'MINIMUM BURY. PROVIDE INSULATION ABOVE PIPES WITH LESS THAN 5' OF GROUND COVER.12.GRANULAR BACKFILL MATERIALS ARE REQUIRED IN ALL UTILITY TRENCHES UNDER SIDEWALKS ANDPROPOSED PAVED AREAS (UNLESS OTHERWISE SPECIFIED BY A GEOTECHNICAL ENGINEER). ALLUTILITY TRENCH BACKFILL SHALL BE COMPACTED PER SPECIFICATIONS. ALL PAVEMENT PATCHINGSHALL COMPLY WITH THE VILLAGE OF MOUNT HOREB STANDARDS. ADDITIONAL PAVEMENT MILLINGAND OVERLAY MAY BE REQUIRED BY PERMIT.
13.CONTRACTOR SHALL NOTIFY THE MUNICIPAL PUBLIC WORKS DEPARTMENT A MINIMUM OF 48HOURS BEFORE CONNECTING TO PUBLIC UTILITIES.14.ALL NON-METALLIC BUILDING SEWER AND WATER SERVICES MUST BE ACCOMPANIED BY MEANS OFLOCATING UNDERGROUND PIPE. TRACER WIRE VALVE BOXES SHALL BE INSTALLED ON ALL LATERALSAND AS INDICATED ON THESE PLANS.15.EXTERIOR CLEANOUTS SHALL BE PROVIDED AS REQUIRED BY SPS 382.35. ALL EXTERIOR CLEANOUTSSHALL BE PROVIDED WITH A FROST SLEEVE IN ACCORDANCE WITH SPS 382.34(5)(a)b AND SPS384.30(2)(c).16.ALL PRIVATE PLUMBING MATERIALS SHALL CONFORM TO SPS 384.30.17.ALL PRIVATE PIPE JOINTS SHALL BE INSTALLED PER SPS 384.40.18.ALL PRIVATE WATER PIPE, INCLUDING DEPTH AND SEPARATION REQUIREMENTS, SHALL BE INACCORDANCE WITH SPS 382.40(8).19.THE CONTRACTOR SHALL ALLOW 10 WORKING DAYS FOR THE CONSTRUCTION OF GAS MAINS WHENSCHEDULING THE WORK AND SHALL NOT RESTRICT ACCESS TO THE GAS MAIN CONTRACTOR OROTHER UTILITY COMPANIES.20.INLET CASTINGS SHALL BE SET TO GRADE PRIOR TO AND SEPARATE FROM THE POURING OF THECONCRETE CURB AND GUTTER. IS IS REQUIRED THAT THREE FEET OF CONCRETE CURB AND GUTTERON EACH SIDE OF THE INLET SHALL BE POURED BY HAND, NOT THROUGH THE USE OF A CURBMACHINE. THE INLET CASTING SHALL BE SET TO GRADE ON A BED OF MORTAR WHICH SHALL BE AMINIMUM OF TWO INCHES THICK. THE INLET SHALL BE PLACED ON THE MORTAR BED AND SHALL BEADJUSTED TO GRADE BY APPLYING DIRECT PRESSURE TO THE CASTING. ONCE THE CASTINGADJUSTMENT IS COMPLETE, THREE FEET OF CURB AND GUTTER ON EACH SIDE OF THE CASTINGSHALL BE POURED BY HAND.21.CONTRACTOR SHALL VERIFY AND COORDINATE ALL UTILITY CONNECTIONS WITH THE BUILDINGPRIOR TO CONSTRUCTION.22.THE CONTRACTOR SHALL CONDUCT HIS OPERATIONS SO AS TO BE IN CONFORMANCE WITH THEVILLAGE EROSION CONTROL AND STORMWATER ORDINANCE, AND DNR ADMINISTRATIVE RULE NR216 AT ALL TIMES.
UTILITY NOTES
1181.25 EP1.0%
Page 23 of 251
LANGHUS ON MAINVILLAGE OF MOUNT HOREB, DANE COUNTY, WI
C401
FLOWDIRECTION
WOVEN GEOTEXTILE FABRIC
ANCHOR TRENCH
SECURE FABRIC TO POST WITH 0.5" STAPLESIN 5 PLACES MIN.
SUPPORT CORD118 " x 118 " x 48" (MIN.) AIR OR KILN DRIEDHICKORY OR OAK POSTSGEOTEXTILE FABRIC
18" MIN. POLYESTEROR NYLON SUPPORTCORDFLOW
4" WIDE x 6" DEEPANCHOR TRENCH8" MIN. GEOTEXTILE INANCHOR TRENCH
BACKFILL AND COMPACTANCHOR TRENCH
+ 24"
FLOW MATERIAL NOTES1.GEOTEXTILE FABRIC SHALL BE WOVEN AND SHALL CONFORM TO THE MATERIALREQUIREMENTS LISTED IN SECTION 628 OF THE WISDOT STANDARDSPECIFICATIONS FOR HIGHWAY AND STRUCTURE CONSTRUCTION, 2003EDITION.INSTALLATION NOTES1.INSTALLATION SHALL CONFORM WITH THE REQUIREMENTS OF WDNRCONSERVATION PRACTICE STANDARD 1056.2.CONSTRUCT THE SILT FENCE IN AN ARC WITH THE ENDS POINTING UPSLOPE TOAVOID EROSION AROUND THE ENDS OF THE FENCE.3.FAILURE TO PROPERLY ANCHOR SILT FENCE COULD RESULT IN WATER ANDSEDIMENT RELEASE BENEATH THE SILT FENCE. PROPERLY SECURE THE SILTFENCE INTO THE ANCHOR TRENCH.4.CONSTRUCT THE FENCE FROM A CONTINUOUS ROLL OF GEOTEXTILE TO AVOIDJOINTS. WHERE JOINTS ARE NECESSARY, OVERLAP TO THE NEXT POST ORWRAP ADJOINING FABRICS TOGETHER AROUND THE JOINT POST AND TIGHTLYFASTEN.5.SILT FENCE SHALL NOT BE USED IN AREAS OF CONCENTRATED FLOW.
INSPECTION & MAINTENANCE NOTES1.AT A MINIMUM, PERFORM INSPECTIONS WEEKLY ANDWITHIN 24 HOURS OF PRECIPITATION EVENTSPRODUCING 0.5 INCHES OR MORE OF RAINFALL.2.INSPECT FENCES FOR DAMAGE TO STAKES AND FABRIC,UNDERCUTTING, EXCESSIVE SEDIMENT ACCUMULATION(GREATER THAN 12 OF THE FENCE HEIGHT), ANDINDICATIONS OF SCOUR AROUND THE EDGES.3.REPAIR OR REPLACE SILT FENCE WITHIN 24 HOURS OFIDENTIFYING AND DEFICIENCIES.SILT FENCE
48" MIN.
FOLD 3"MAX.
6' TYP. / 8' MAX.
20" MIN. POSTBURIAL
WIDTH AS SHOWN ON PLANSTOP OF CURBSECTION A-A
PLANOPTIONAL FLOWLINE(DRIVEWAY TYPE "X"CURB)
1" EXPANSION JOINT1/2" EXPANSION JOINT
DRIVEWAY
AA
VARIABLE
VARIABLE18"1.0' MIN. FULL HEIGHT CURB BETWEEN APRONS5' TYPICAL
PROFILECRUSHED AGGREGATEBASE COURSE
SAWCUT EXISTING CURB HEADOR REMOVE AND REPLACECURB AND GUTTERMAX. GRADE 10%
7" CONCRETE6" GRANULAR MATERIALINCIDENTAL TO SIDEWALKAND DRIVEWAYCONSTRUCTION
SIDEWALK
5' WIDE SIDEWALK
SLOPE 1.5%
IF THERE IS ANY DISCREPANCYBETWEEN DETAIL AND VILLAGEREQUIREMENTS, THE VILLAGESTANDARD SHALL BE USED.
COMMERCIAL ENTRANCE
GEOTEXTILE FABRIC (IF NECESSARY)EXISTING ROAD
50'
12" MIN.
12' MIN.
REFER TO MATERIALS NOTES
MATERIAL NOTES
INSTALLATION NOTES
INSPECTION & MAINTENANCE NOTES
CONSTRUCTION ENTRANCE (STONE TRACKING PAD)
1. USE HARD, DURABLE, ANGULAR STONE OR RECYCLED CONCRETEMEETING THE GRADATION IN TABLE 1. WHERE THIS GRADATION ISNOT AVAILABLE, MEET THE GRADATION IN WISCONSIN DEPARTMENTOF TRANSPORTATION (DOT) STANDARD SPECIFICATION, SECTION 312SELECT CRUSHED MATERIAL. USE MATERIAL SUBSTANTIALLY FREEFROM DIRT, DEBRIS, STEEL, VEGETABLE MATTER, AND OTHERDELETERIOUS MATERIAL. PLACE THE AGGREGATE IN A LAYER ATLEAST 12 INCHES THICK.2. THE TRACKING PAD SHALL BE UNDERLAIN WITH A WDOT TYPE RGEOTEXTILE FABRIC WHERE WARRANTED BASED ON SOIL TYPE ORHIGH GROUNDWATER.1. INSTALLATION SHALL CONFORM WITH THE REQUIREMENTS OFWDNR CONSERVATION PRACTICE STANDARD 1057.2. INSTALL THE TRACKING PAD ACROSS THE FULL WIDTH OF THEACCESS POINT, OR RESTRICT EXITING TRAFFIC TO A DEDICATEDEGRESS LANE WITH A DRIVING SURFACE AT LEAST 12 FEET WIDE.3. DIMENSIONS OF THE TRACKING PAD SHALL BE MINIMUM AS NOTEDON THE FIGURE ABOVE.4. DIVERT SURFACE FLOWS AWAY FROM TRACKING PADS OR CONVEYFLOW UNDER AND/OR AROUND USING CULVERTS AND SWALES. DIRECTRUNOFF FROM TRACKING PADS TO SEDIMENT CONTROL PRACTICES.5. DO NOT COMPACT AGGREGATE PRIOR TO USE. COMPACTION,GROUTING, OR OTHER MEANS OF CREATING A SMOOTH SURFACECOMPROMISE THE EFFECTIVENESS OF THE TRACKING PAD.6. TRACKING PAD SHALL BE REMOVED OR INCORPORATED INTOGRAVEL DRIVEWAY ONLY AFTER CONSTRUCTION IS COMPLETE ANDTHE SITE HAS BEEN STABILIZED.
1. STONE TRACKING PADS SHALL BE INSPECTED WEEKLY AND WITHIN 24HOURS AFTER EVERY PRECIPITATION EVENT THAT PRODUCES 0.5 INCHES OFRAIN OR MORE DURING A 24 HOUR PERIOD.2. MONITOR AND MAINTAIN DEVICES TO MINIMIZE SHIFTING, RUTTING OFADJACENT SURFACES, AND STRUCTURAL FAILURE. MAINTAIN A LOOSENED,ROUGH SURFACE BY SCRAPING, LOOSENING, OR TOP-DRESSING WITHADDITIONAL AGGREGATE.2. ADDITIONAL AGGREGATE SHALL BE PLACED IF THE TRACKING PAD BECOMESBURIED OR IF SEDIMENT IS NOT BEING REMOVED EFFECTIVELY FROM THEVEHICLE TIRES.3. A MINIMUM 30-FEET WIDE BY 50-FEET LONG BY 12-INCH THICK PAD SHALLBE MAINTAINED AT ALL TIMES. ADD STONE AS NEEDED TO MAINTAIN THEMINIMUM PAD THICKNESS.4. THE TRACKING PAD PERFORMANCE SHALL BE MAINTAINED BY SCRAPING ORTOP-DRESSING WITH ADDITIONAL AGGREGATE.5. ANY SEDIMENT TRACKED ONTO A PUBLIC OR PRIVATE ROAD SHOULD BEREMOVED BY STREET CLEANING AT THE END OF EACH WORKING DAY.6. REMOVE STONES LODGED BETWEEN THE TIRES OF DUAL WHEEL VEHICLESPRIOR TO LEAVING THE CONSTRUCTION SITE.7. MAINTENANCE SHALL BE COMPLETED AS SOON AS POSSIBLE WITHCONSIDERATION FOR SITE CONDITIONS.8. REPLACE DAMAGED OR CRUSHED CULVERTS UNDER TRACKING PAD.
SIEVESIZEPERCENT BYWEIGHT PASSING 3" 1002-1/2" 90-1001-1/2" 25-60 3/4" 0-20 3/8" 0-5
TABLE 1
INSET
NOTES:1.DETAIL BASED ON WDNR TECHNICAL STANDARD 1060. ANY VARIATIONS FROMTHAT STANDARD IS UNINTENDED AND SHOULD NOT BE USED.2.TAPER BOTTOM OF BAG TO MAINTAIN 8" OF CLEARANCE BETWEEN THE BAG ANDTHE STRUCTURE, MEASURED FROM THE BOTTOM OF THE OVERFLOW OPENINGSTO THE STRUCTURE WALL.3.THE RIGID FRAME SHALL BE CONSTRUCTED OF GALVANIZED STEEL AND HAVEADEQUATE STRENGTH TO SUPPORT THE WEIGHT OF THE SEDIMENT BAG WHENCOMPLETELY FULL.4.THE RIGID FRAME SHALL NOT INTERFERE WITH OR ELEVATE THE GRATE MORETHAN 1/8".5.DROP THE INLET FILTER THOUGH THE CLEAR OPENING SUCH THAT THE HANGERSREST FIRMLY ON THE LIP OF THE STRUCTURE.TYPE D-RF INLET PROTECTION
CURB BACKEXTENSION FORINLETS WITHCURB BOXES
MAINTENANCE NOTES:1.WHEN REMOVING OR MAINTAINING INLET PROTECTION, CARS SHALL BE TAKENSO THAT THE SEDIMENT TRAPPED IN THE FABRIC DOES NOT FALL INTO THESTRUCTURE. MATERIAL THAT HAS FALLEN INTO THE STRUCTURE SHALL BEIMMEDIATELY REMOVED.
REPLACEABLEFILTER BAG (22"MIN. TOTAL DEPTH)DUAL FABRIC BAGSSHALL BE STITCHEDTOGETHER.12" MIN.
LENGTH AND WIDTHDIMENSIONS SHALL BE PERINLET TYPE SPECIFIED ON PLANHANGERS (SEE NOTE #5)
AVAILABLE OVERFLOW DEPTHRIGID FRAME (SEE NOTES #2 AND #3)TYPE FF GEOTEXTILE FABRICNON-WOVEN INNER BAG LINER(COVERING LOWER HALF OF BAG)
CAN BE INSTALLED IN INLETSWITH OR WITHOUT CURB BOXES
RIBBON CURB
1.0'2.0'7-3/4"3/4"
Page 24 of 251
E
OHE
OHE
OHE
OHE
OHE
OHEOHE
OHEOHEOHE
OHEOHE
OHEOHE
OHEOHEOHE
OHEOHE
OHEOHE
OHEOHE
OHEOHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHEOHEOHEOHE
EE
EEEEE
E
E
E
E
E
E
E E E E E E E E E E E E E
E E E
E E E E
E
E
SANSAN
LANGHUS ON MAINVILLAGE OF MOUNT HOREB, DANE COUNTY, WI
L100
LEGEND (PROPOSED)
PROPOSED BUILDING28,500 SQ.FT.
EAST MAIN STREET
PROPOSED PROPERTY BOUNDARYEASEMENTBUILDING FOOTPRINTCONCRETE PAVEMENT
NORTH THIRD STREET
OVERALL PARCEL31,653 SQ. FT.OR 0.73 ACRES
PUBLIC ALLEY16.5' RIGHT-OF-WAY
2.5' WIDE PUBLIC SIDEWALK EASEMENT.
4.5' WIDE PUBLIC SIDEWALK EASEMENT.
2.5' WIDE PUBLIC SIDEWALK EASEMENT.
EXISTING STREET
TREE TO REMAIN
PROTECT DURING
CONSTRUCTION
EXISTING STREET
TREE TO REMAIN
PROTECT DURING
CONSTRUCTION
EXISTING STREET
TREE TO REMAIN
PROTECT DURING
CONSTRUCTION
EXISTING STREET
TREE TO REMAIN
PROTECT DURING
CONSTRUCTION
EXISTING STREET
TREE TO REMAIN
PROTECT DURING
CONSTRUCTION
PL1: +/- 36" TALL
PLANTER WITH
VERTICAL ANNUALS
(5 THUS)
PL2: +/- 30" TALL
PLANTER WITH
VERTICAL ANNUALS
(8 THUS)
GREEN ROOF OVER
CANOPY STRUCTURE
("LIVEROOF" OR SIM.)
GREEN ROOF OVER
CANOPY STRUCTURE
("LIVEROOF" OR SIM.)
NOTE: ALL PLANTERS PROPOSED SHALL BE MOBILE
AND PLACED OUTSIDE OF THE PUBLIC RIGHT OF WAY
AND ANY SIDEWALK EASEMENT
PL2
PL2
PL2
PL2
PL2
PL2
PL2
PL2
PL1
PL1
PL1
PL1
PL1
Page 25 of 251
TRASH
ELEV.
STAIRS STAIRS
APT.STAIRENTRY
54 TOTAL PARKING SPACES
BIKEPARKING
COMPACTCOMPACTCOMPACT
BIKE PARKING
COMPACTCOMPACTCOMPACT
9082 SFCOMMERCIAL SPACE
17843 SFPARKING GARAGE
Luminaire ScheduleQtyLabelLLFMFGDescription Lum. WattsTotal WattsLum. Lumens20OD10.950TGS880715-R3-5CCT 15 30010139 OW10.950KUZCOEW46308-BK-UNV-3CCT20 18011202 OW20.950LITHONIAWPX0 LED ALO SWW2 MVOLT PE DDBXD M212.451124.902164511OW30.950ANPA810 AM01W D xxK (finish) E2513.23145.531207
Calculation SummaryLabel CalcTypeUnitsAvgMaxMinAvg/MinMax/MinSITE IlluminanceFc1.6810.110.01168.001011
0.040.060.090.100.110.120.130.130.130.130.140.130.130.130.140.140.130.130.130.130.120.120.120.120.110.100.100.110.130.170.200.230.260.270.280.300.320.370.450.570.700.770.770.720.670.650.660.760.900.980.990.910.750.570.400.290.200.060.120.200.250.240.240.280.290.270.270.300.280.260.280.300.270.240.230.230.220.210.210.210.210.190.150.140.150.210.300.400.450.500.540.540.540.580.640.781.051.381.591.531.351.201.151.171.321.611.972.021.801.411.000.670.430.280.100.270.680.910.700.600.910.970.690.751.000.830.570.801.010.760.470.430.480.440.370.370.430.440.360.250.190.220.410.821.081.091.211.421.321.171.291.391.411.892.693.152.972.512.172.072.102.353.043.614.093.552.681.801.100.650.390.140.662.223.512.101.562.993.421.882.113.652.601.422.363.642.240.960.921.120.870.670.660.941.050.770.420.250.300.892.493.542.863.094.353.672.853.523.622.632.944.365.014.794.093.573.523.463.864.516.066.386.314.833.111.750.950.530.120.704.729.793.961.917.048.722.793.689.785.571.514.7110.114.150.561.822.771.900.730.061.962.701.620.610.060.171.055.969.765.877.029.198.045.428.578.673.232.353.383.553.853.913.834.043.783.943.954.187.096.576.944.442.351.190.632.734.072.903.114.07 3.485.094.42 8.468.938.935.612.911.440.748.567.385.793.051.530.803.973.892.891.540.833.663.982.511.500.873.764.742.901.570.895.175.883.591.840.936.456.844.052.010.995.506.053.641.890.984.325.003.001.670.904.014.542.771.530.853.794.972.971.500.814.515.862.961.390.741.693.042.011.130.641.471.681.370.860.523.202.431.300.750.464.733.371.520.750.454.673.401.590.780.464.393.121.560.860.522.402.591.731.020.612.523.772.451.340.744.476.483.431.620.833.425.883.531.700.864.075.813.091.450.750.010.020.050.140.421.444.727.363.360.960.290.100.040.020.020.030.050.150.481.845.966.802.691.985.107.413.311.834.207.714.151.833.397.455.061.952.746.815.891.760.450.140.060.050.100.280.913.177.264.911.520.441.342.621.751.020.580.020.030.080.200.581.754.786.633.601.240.410.150.060.030.020.030.050.130.381.223.253.721.801.432.953.952.101.332.504.092.501.342.153.972.901.401.803.713.241.200.370.130.070.080.150.391.173.446.574.951.850.610.410.710.790.570.380.020.040.080.190.471.132.222.711.870.860.360.150.070.040.020.030.040.080.190.440.790.880.640.580.820.930.690.570.760.950.760.580.710.940.800.570.630.870.790.430.190.090.060.080.150.340.831.812.702.271.170.500.260.210.250.280.230.020.030.070.140.280.530.840.950.750.440.230.110.060.030.020.020.030.050.080.140.190.220.210.210.230.240.220.210.220.240.230.210.220.240.220.200.200.220.190.140.090.060.050.070.120.220.430.740.950.850.550.300.170.120.100.130.130.010.030.050.080.140.220.300.320.280.190.120.070.040.030.020.020.020.030.040.050.070.080.080.090.090.090.090.090.090.090.090.090.090.090.090.080.080.080.070.060.040.040.040.050.070.120.190.280.320.300.230.150.100.070.060.060.07
OW2MH: 9 OW2MH: 9OW1MH: 9OW1MH: 9OW1MH: 9OW1MH: 9OW1MH: 9
OD1MH: 10OD1MH: 10OD1MH: 10OD1MH: 9OD1MH: 9 OD1MH: 12OD1MH: 12
OD1MH: 12OD1MH: 12OD1MH: 12OD1MH: 12OD1MH: 12OD1MH: 12
OD1MH: 12
OD1MH: 12
OD1MH: 12OD1MH: 12
OW1MH: 16OW1MH: 16OW1MH: 16
OW1MH: 16
OD1MH: 10
OD1MH: 10
OD1MH: 10
OW3MH: 10
OW3MH: 10OW3MH: 10
OW3MH: 8.33OW3MH: 8.33OW3MH: 8.33OW3MH: 8.33OW3MH: 8.33OW3MH: 8.33OW3MH: 8.33 OW3MH: 40
REVISIONS#DATECOMMENTSDRAWN BY : DATE :SCALE :
JTNOV 12, 20253/32" = 1'
LANGUS MIXED USEMOUNT HOREB, WISCONSINSITE LIGHTING LAYOUT
NOTES:·Customers are responsible for confirming mounting heights, fixture suspension types/ lengths, colortemperature, CRI, linear fixture lengths, pole lengths, and bollard heights/ lengths prior to ordering.·Mounting height (MH) is measured from the bottom of the fixture to the floor.·This Lighting layout assumes the following unless values are specified and must be confirmed by thecustomer prior to ordering.··Room reflectance of 80, 50, 20 for standard ceilings and 50, 50, 20 for exposed ceilings··Wall sconces are mounted at 7' for calculation purposes. Customer must confirm desiredmounting height before rough in.
Page 26 of 251
TRASH
ELEV.
STAIRS STAIRS
APT.
STAIR
ENTRY
101
PARKING GARAGE
245'-10"
54 TOTAL PARKING SPACES
BIKE
PARKING
117'-0 1/2"
COMPACT
54'-10"
ELEC.
COMPACT
VERTICAL BIKE RACK
18'-0" 24'-0" 193'-1" 3'-8" 5'-1"
18'-0" TYP.
9'-0" TYP.
17'-0"
60'-7" 14'-0" 20'-7" 58'-3" 47'-2" 43'-5"
18'-0" 24'-0" 36'-0" 34'-5" 2'-11"
ENTER ONLY
EXIT ONLY
8'-9"
24'-4" 37'-0" 21'-0"
HORIZONTAL RHYTHM SPACING
38'-6" 28'-10" 7'-1" 29'-3" 25'-10" 10'-6" 23'-6"
1'-4"
2'-8"
78'-0 3/8"
8'-9" 8'-9"
9'-0" 9'-0"
9897 SF
COMMERCIAL SPACE
COMPACT COMPACT COMPACT
700 SF
APARTMENT
AMMENITY
HOOD
CHASE
ABOVE
BOMA CALC
6,965 SF
BOMA CALC
2,545 SF
COMMERCIAL SPACE
0' 3/8"
0' 4' 8' 16'
3/4" 1 1/2"
SCALE: 3/32" = 1' -0"
2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570
© SKETCHWORKS ARCHITECTURE, LLC, 2024
LANGHUS ON MAIN
FLOOR PLANS
1 OF 8 DATE: 09/30/26
PLAN
NORTH
TRUE NORTH ROTATION
• PARKING STALLS: 54 TOTAL
• RESIDENTIAL UNITS: 42 TOTAL
• COMMERCIAL SPACE: 9,540 SF
(LEASEABLE BOMA CALC TOTAL)
FIRST FLOOR PLAN - COMMERCIAL SPACE, TENANT PARKING
Page 27 of 251
SHOWER
REF
SHOWER
SHOWER
REF
REF
SHOWER
REF
SHOWER
SHOWER
REF
REF
REF REF
REF
SHOWER REF
SHOWER
SHOWER
REF
REF
REF
REF REF
SHOWER
REF SHOWER REF
SHOWER
SHOWER
REF
SHOWER
REF
REF
SHOWER
SHOWER
875 SF
1 BED / DEN
555 SF
STUDIO
638 SF
STUDIO
1118 SF
2 BED
717 SF
1 BED
1104 SF
2 BED
764 SF
1 BED
958 SF
1 BED / DEN
1163 SF
2 BED
726 SF
1 BED
834 SF
1 BED
877 SF
1 BED
807 SF
1 BED
692 SF
1 BED
686 SF
1 BED
747 SF
1 BED
749 SF
1 BED
1105 SF
2 BED
1511 SF
STORAGE
STAIR
STAIR
ELEV
ELEV
LOBBY
1115 SF
1 BED / DEN
80 SF
CHASE
TYPE A UNIT
804 SF
STORAGE
651 SF
MECH
1134 SF
GYM
2 BED
1114 SF
14 UNITS
30 UNITS
0' 3/8"
0' 4' 8' 16'
3/4" 1 1/2"
SCALE: 3/32" = 1' -0"
2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570
© SKETCHWORKS ARCHITECTURE, LLC, 2024
LANGHUS ON MAIN
FLOOR PLANS
2 OF 8 DATE: 09/30/26
PLAN
NORTH
TRUE NORTH ROTATION
SECOND FLOOR
20 TOTAL UNITS
a. (2) STUDIO
• GROSS SF: 1,194
b. (10) 1 BED
• GROSS SF: 7,599
c. (3) 1 BED / DEN
• GROSS SF: 2,934
d. (5) 2 BED
GROSS SF: 5,604
GYM
STORAGE
MECHANICAL
SECOND FLOOR CONCEPT PLAN
Page 28 of 251
SHOWER
REF
SHOWER
REF
SHOWER REF
SHOWER
REF
REF
SHOWER
REF
REF
SHOWER
SHOWER
REF
REF
SHOWER
REF
REF
REF
REF
REF
REF
SHOWER
REF
SHOWER
REF
SHOWER
REF
SHOWER
REF
SHOWER
REF
SHOWER
REF
SHOWER
REF
SHOWER
762 SF
1 BED
756 SF
1 BED
785 SF
1 BED
726 SF
1 BED
1163 SF
2 BED
717 SF
1 BED
1119 SF
2 BED
637 SF
STUDIO
555 SF
STUDIO
848 SF
1 BED / DEN
807 SF
1 BED
587 SF
STUDIO
591 SF
STUDIO
765 SF
1 BED
765 SF
1 BED
564 SF
COMMUNITY ROOM
749 SF
1 BED
STAIR
ELEV
ELEV
LOBBY
STAIR
767 SF
1 BED
701 SF
STUDIO
863 SF
1 BED / DEN
1118 SF
2 BED
104'-10" 63'-5" 19'-0" TO PROP. LINE 60'-3"
590 SF
STUDIO
77 SF
CHASE
EXIT
834 SF
1 BED
2818 SF
COMMUNITY PATIO
TYPE A
0' 3/8"
0' 4' 8' 16'
3/4" 1 1/2"
SCALE: 3/32" = 1' -0"
2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570
© SKETCHWORKS ARCHITECTURE, LLC, 2024
LANGHUS ON MAIN
FLOOR PLANS
3 OF 8 DATE: 09/30/26
PLAN
NORTH
TRUE NORTH ROTATION
THIRD FLOOR - CONCEPT PLAN
THIRD FLOOR
22 TOTAL UNITS
a. (6) STUDIO
• GROSS SF: 3,663
b. (11) 1 BED
• GROSS SF: 8,392
c. (2) 1 BED / DEN
• GROSS SF: 1,711
d. (3) 2 BED
• GROSS SF: 3,404
COMMUNITY ROOM
COMMUNITY PATIO
Page 29 of 251
T.O. TRUSS
137' -11 3/4"
FIRST FLOOR
100' -0"
2
6
7
10
20
13
14
15
21
FOREGROUND OUTLINE OF MHTC BUILDING
MAX BUILDING HEIGHT
140' -0"
PARAPET MAX.
145' -0"
16
1
19
12
7
24
25
14
T.O. TRUSS
137' -11 3/4"
FIRST FLOOR
100' -0"
1 5
6 7
2
5
16
15
14
21
14
15
25 13
15
17
1 15
22
17
20
OUTLINE OF
MHTC BUILDING
23
MAX BUILDING HEIGHT
140' -0"
3
3
PARAPET MAX.
145' -0"
8'-0"
1
11 18
18
8 8
218 12
11
4
4
24
7
20
19
8
15
0' 1/4"
0' 2' 4' 8'
1/2" 1"
SCALE: 1/8" = 1' -0"
2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570
© SKETCHWORKS ARCHITECTURE, LLC, 2024
LANGHUS ON MAIN
ELEVATIONS
4 OF 8 DATE: 09/30/26
WEST ELEVATION - COLORED
SOUTH ELEVATION - COLORED
EXTERIOR ELEVATIONS KEYNOTE SCHEDULE
# DESCRIPTION COLOR
1 CLAY BRICK MASONRY - FULL BED RED/BROWN
BLEND
COUNTRY CLUB -TUMBLED - ACME BRICK
2 CLAY BRICK MASONRY - RED TONE ASHBURY - BRICKCRAFT
3 CLAY BRICK MASONRY - TAN/ BROWN BLEND CEDAR CREEK - BRICKCRAFT
4 CLAY BRICK MASONRY - TAN/ BROWN CEDAR CREEK SOLDIER COURSING
5 LIMESTONE MASONRY HILLCREST STONE - WHEAT
6 LP SMARTSIDE SIDING - BOARD AND BATTEN SHERWIN WILL IAMS - ROYCROFT MIST GRAY
7 LP SMARTSIDE - BOARD AND BATTEN SHERWIN WILLIAMS - HAMMERED SILVER
8 LP SMARTSIDE LAP SIDING SHERWIN WILLIAMS - SEALSKIN
9 LP SMARTSIDE LAP SIDING DESERT STONE
10 CONCRETE MASONRY UNIT BUFF - COUNTY MATERIALS
11 ARCHITECTURAL PANEL SIDING SHERWIN WILLIAMS - PEWT ER GREEN
12 ALUMINUM GATE / FENCE - 8'-0" TALL BRONZE FINISH
13 CORBLE ACCENT PANEL SHERWIN WILLIAMS - SEALSKIN
14 METAL BALCONY AND RAILING MEDIUM - DARK BRONZE
15 CONCRETE MASONRY COPING LIGHT GREY/ CONCRETE
16 LP SMARTSIDE - TRIM BOARDS DESERT STONE
17 COMPOSITE WOOD TRIM BOARDS,
DECORATIVE
SHERWIN WILLIAMS - SEALSKIN
18 TRIM ACCENTS SHERWIN WILLIAMS - ROOKWOOD BLUE GREE N
19 CEDAR SHAKE ROOF MEDIUM - LIGHT WOOD
20 METAL CANOPY BRONZE TONE
21 FABRIC AWNING COLOR TBD PER TENANT
22 LINTEL OVER WINDOWS AND OPENINGS MEDIUM - LIGHT MA SONRY UNIT OR FAUX WOOD ELEMENT
23 GREEN ROOF LIFEROOF PRODUCT OR SIMILAR
24 CORBLE ACCENT PANEL SHERWIN WILLIAMS - CREAMY
25 CORBLE ACCENT PANEL SHERWIN WILLIAMS -TAWNY TAN
Page 30 of 251
ALLEY
106' -7"
6
7
10
13
14
7
15
6
7
8
10
13
11
14
15
ELECTRICAL LOUVER GAS METERS
LOUVER
MAX BUILDING HEIGHT
140' -0"
EXIT ONLY
AT GARAGE DOOR
PARAPET MAX.
145' -0"
8
11
11
ALLEY
106' -7"
T.O. TRUSS
137' -11 3/4"
FIRST FLOOR
100' -0"
1
15
13
7
19
14
17
18
22
17
9
13
20
MAX BUILDING HEIGHT
140' -0"
3
ENTRANCE ONLY
AT GARAGE DOOR
PARAPET MAX.
145' -0"
16
6
10
4
15 8
15
17
17
0' 1/4"
0' 2' 4' 8'
1/2" 1"
SCALE: 1/8" = 1' -0"
2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570
© SKETCHWORKS ARCHITECTURE, LLC, 2024
LANGHUS ON MAIN
ELEVATIONS
5 OF 8 DATE: 09/30/26
NORTH ELEVATION - COLORED
EAST ELEVATION - COLORED
EXTERIOR ELEVATIONS KEYNOTE SCHEDULE
# DESCRIPTION COLOR
1 CLAY BRICK MASONRY - FULL BED RED/BROWN
BLEND
COUNTRY CLUB -TUMBLED - ACME BRICK
2 CLAY BRICK MASONRY - RED TONE ASHBURY - BRICKCRAFT
3 CLAY BRICK MASONRY - TAN/ BROWN BLEND CEDAR CREEK - BRICKCRAFT
4 CLAY BRICK MASONRY - TAN/ BROWN CEDAR CREEK SOLDIER COURSING
5 LIMESTONE MASONRY HILLCREST STONE - WHEAT
6 LP SMARTSIDE SIDING - BOARD AND BATTEN SHERWIN WILL IAMS - ROYCROFT MIST GRAY
7 LP SMARTSIDE - BOARD AND BATTEN SHERWIN WILLIAMS - HAMMERED SILVER
8 LP SMARTSIDE LAP SIDING SHERWIN WILLIAMS - SEALSKIN
9 LP SMARTSIDE LAP SIDING DESERT STONE
10 CONCRETE MASONRY UNIT BUFF - COUNTY MATERIALS
11 ARCHITECTURAL PANEL SIDING SHERWIN WILLIAMS - PEWT ER GREEN
12 ALUMINUM GATE / FENCE - 8'-0" TALL BRONZE FINISH
13 CORBLE ACCENT PANEL SHERWIN WILLIAMS - SEALSKIN
14 METAL BALCONY AND RAILING MEDIUM - DARK BRONZE
15 CONCRETE MASONRY COPING LIGHT GREY/ CONCRETE
16 LP SMARTSIDE - TRIM BOARDS DESERT STONE
17 COMPOSITE WOOD TRIM BOARDS,
DECORATIVE
SHERWIN WILLIAMS - SEALSKIN
18 TRIM ACCENTS SHERWIN WILLIAMS - ROOKWOOD BLUE GREE N
19 CEDAR SHAKE ROOF MEDIUM - LIGHT WOOD
20 METAL CANOPY BRONZE TONE
21 FABRIC AWNING COLOR TBD PER TENANT
22 LINTEL OVER WINDOWS AND OPENINGS MEDIUM - LIGHT MA SONRY UNIT OR FAUX WOOD ELEMENT
23 GREEN ROOF LIFEROOF PRODUCT OR SIMILAR
24 CORBLE ACCENT PANEL SHERWIN WILLIAMS - CREAMY
25 CORBLE ACCENT PANEL SHERWIN WILLIAMS -TAWNY TAN
10
Page 31 of 251
2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570
© SKETCHWORKS ARCHITECTURE, LLC, 2024
LANGHUS ON MAIN
EXTERIOR MATERIALS
6 OF 8 DATE: 09/30/26
Page 32 of 251
2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570
© SKETCHWORKS ARCHITECTURE, LLC, 2024
LANGHUS ON MAIN
RENDERINGS
DATE: 09/30/26
EXISTING TREES TO REMAIN ON SITE
Page 33 of 251
2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570
© SKETCHWORKS ARCHITECTURE, LLC, 2024
LANGHUS ON MAIN
RENDERINGS
DATE: 09/30/26
Page 34 of 251
Date: Nov 13, 2025
Enterprise Lighting, LTD.
2007 Pewaukee Rd.
Waukesha WI 53188
Phone: (262) 953-2700
Job Name
Langus Mixed Use
ELL25-143233
Mount Horeb WI
Bid Date
Nov 12, 2025
Submittal Date
Nov 13, 2025
Page 35 of 251
Date: Nov 13, 2025 Page 1/1
Transmittal
Enterprise Lighting, LTD.
2007 Pewaukee Rd.
Waukesha WI 53188
Phone: (262) 953-2700
From: Andrea Goral
FF00009 Page 1/1Visit us on the web at www.enterpriselighting.com
Project Langus Mixed Use
Quote# ELL25-143233
Location Mount Horeb WI
To Electrical Solutions
2928 HWY MN
Stoughton WI 53589
Contact: Bernie Esch
ATTACHED WE ARE SENDING YOU 1 COPY OF THE FOLLOWING ITEM:
X Drawings Specifications Other:
Prints Information
Plans Submittals
THESE ARE TRANSMITTED FOR:
Prior Approval Resubmittal for Approval Record
X Approval Corrections Bids due on:
Approval as Submitted Your Use Other:
Approval as Noted Review and Comment
Type MFG Part
OD1 Truly Green Solutions, Inc. 880715-R3-5CCT
OW1 Kuzco Lighting EW46308-BK-UNV-3CCT
OW2 Lithonia Exterior WPX0 LED ALO SWW2 MVOLT PE
DDBXD M2
OW3 ANP Lighting A810-AM10W-D-**K-E25
Page 36 of 251
www.trulygreensolutions.com
1
9601 Variel Ave, Chatsworth, CA 91311 Specifications & dimensions subject to change without notice.
(818) - 206 - 4404 *MOQ & longer lead times may apply, please contact customer
service for more information.
INDOOR
06232025
ThinTek™ Mini R3
Residential, Commercial, Multi-Family
ORDERING INFORMATION
0510 - 5"/10W
0715 - 7"/15W
0918 - 9"/18W
1121 - 11"/21W
1324 - 13"/24W
5CCT - 2700K/3000K/3500K/4000K/5000KR3 - Round
Surface Mount Downlight
APPLICATIONS
Construction
Lumen Output
FEATURES
Finish
Electrical & Technical Optical
Installation/Mounting
- Die-cast Aluminum Housing - White Trim [Standard]
- Brushed Nickel Trim
- Black Trim
- Bronze Trim
[Trim Options Sold Separately]
• 5"/10W: 710lm
• 7"/15W: 1,241lm
• 9"/18W: 1,460lm
• 11"/21W: 2,156lm
• 13"/24W: 2,431lm
- Input Voltage: 120V
- Input Frequency: 60Hz
- Projected L70: ≥ 50,000 hrs
- PF: >0.9
- CRI: >90
- THD: <20%
- CCT Selectable: 2700K/3000K/
3500K/4000K/5000K
- Operating Temp.: -4°F~113°F
- Wet Location Rated
- Edge-lit
- 120° Beam Angle
- Surface Mounted:
2.75" and 3.5" Junction Box
Date:
Project Name:
Sku #:
88
Controls
- Triac Dimming
Dimmer Compatibility List:
Leviton: 6672, 6674, DSL06, RNL06, IPL06
Lutron: TG-600PR-WH, S-600PR-WH, CTCL-153PDH-WH, TGCL-153PH-LA,
SLV-600P-AL, DV-600PR-WH, SCL-153PH-WH, GT-600P, DVCL-153P,
MSCL-OP153M, MACL-153M//MA-R, PD-6WCL
Warranty
- 5 Year Warranty
See warranty documentation
for more information.
EXAMPLE: 880510-R3-5CCT
Size/Wattage CCTRound Panel Shape/Type
88
Compliance
- JA8 TITLE 24 Compliant
8805-R3 (5" Trim)
8807-R3 (7" Trim)
8809-R3 (9" Trim)
8811-R3 (11" Trim)
8813-R3 (13" Trim)
BK (Black)
BN (Brushed Nickel)
BZ (Bronze)
Trim Finish Options
[Choose Trim Size and Finish Example: 8805-R3-BK]
Submitted by Enterprise Lighting, LTD.
Job Name:
Langus Mixed Use
Catalog Number:
880715-R3-5CCT
Notes:
Type:
OD1
ELL25-143233
Index Page1/2Submitted On: Nov 13, 2025
Page 37 of 251
ThinTek™ Mini R3
Surface Mount Downlight
www.trulygreensolutions.com
2
9601 Variel Ave, Chatsworth, CA 91311 Specifications & dimensions subject to change without notice.
(818) - 206 - 4404 *MOQ & longer lead times may apply, please contact customer
service for more information.
INDOOR
06232025
DIMENSIONS
Mounting
Bracket
(Included)
ACCESSORIES
ø5.51"
ø7.48"
ø8.86"
0.79"
0.79"
0.82"
(2700K) (3000K) (3500K) (4000K) (5000K)
880510-R3-5CCT 5 10 668 671 693 710 68866.8 67.1 69.3 71.0 68.8
880715-R3-5CCT 7 15 1186 1201 1223 1241 121579.06 80.06 84.53 82.7 81
880918-R3-5CCT 1389 1409 1437 1460 142677.16 78.27 79.83 81.11 659 18
SKU Size
(in)
Wattage
(W)
Efficacy
(lm/W)
Efficacy
(lm/W)
Efficacy
(lm/W)
Efficacy
(lm/W)
Efficacy
(lm/W)
Delivered
Lumens
(lm)
Delivered
Lumens
(lm)
Delivered
Lumens
(lm)
Delivered
Lumens
(lm)
Delivered
Lumens
(lm)
LUMEN OUTPUT
881324-R3-5CCT 13 24 2386 2405 2427 2431 241999.41 100.20 101.12 101.29 100.79
881121R3-5CCT 11 21 2016 2037 2079 2156 210896 97 99 102.66 100.38
ø12.8"
0.98"
0.98"
ø10.98"
Brushed Nickel Trim
[5", 7", 9", 11", 13"]
(Option)
[BN]
Black Trim
[5", 7", 9". 11", 13"]
(Option)
[BK]
Bronze Trim
[5", 7", 9" , 11", 13"]
(Option)
[BZ]
Submitted by Enterprise Lighting, LTD.
Job Name:
Langus Mixed Use
Catalog Number:
880715-R3-5CCT
Notes:
Type:
OD1
ELL25-143233
Index Page2/2Submitted On: Nov 13, 2025
Page 38 of 251
LENOXEW46308-UNV-3CCT
WALL
PROJECT
EW46308-BK-UNV-
3CCT
Black
SPECIFICATION DETAILS
Fixture Dimensions W7-3/4" x H7-3/4" x E2-7/8"
Height from center 3-7/8"
Light Source LED with DC Driver
Wattage 20W
Total Lumens 1680lm
Delivered Lumens BK-1060lm*
Voltage 120-277V
Color Temperature Selectable CCT 3000K/4000K/5000K
CRI (Ra) 90CRI
LED Rated Life 50,000 hours
Dimming 100% - 10%, TRIAC or ELV Dimmer (Not Included)
Glass Details Clear Glass
ADA Compliant Yes
Location Wet, IP65
Illumination Direction Down
Mounting Style Wall Mount, Down Only
Material Aluminum + Glass
Paint Finish BK02
* For custom options, consult factory for details.
* For warranty information, please visit www.kuzcolighting.com/warranty
DESCRIPTION
High power LED exterior wall mount fixture intended for use as a
downlight. Lenox’s die-cast aluminum housing is 8-inch square in its
front view, but as the viewer moves to the side the fixture’s profile
becomes a gently swept curve suggestive of a water drop or perhaps a
ship’s sail filling with wind. Lenox aimed downwards through its
polymeric diffuser lights both the mounting plane and floor. Lenox is
available with black finish.
7-3/4” 2-7/8”
FinishBK - Black
7-3/4”
CANADA: 19054 28TH AVENUE - SURREY, BC V3Z 6M3
USA: 3035 E. LONE MOUNTAIN ROAD - LAS VEGAS, NV 89081
WWW.KUZCOLIGHTING.COM
© 2024 KUZCO LIGHTING. ALL RIGHTS RESERVED.
COMMENT
Submitted by Enterprise Lighting, LTD.
Job Name:
Langus Mixed Use
Catalog Number:
EW46308-BK-UNV-3CCT
Notes:
Type:
OW1
ELL25-143233
Index Page1/1Submitted On: Nov 13, 2025
Page 39 of 251
Catalog
Number
Notes
Type
CONTRACTOR SELECT WPX SERIES LED
Page 1 of 2
WPX LED
Wall packs
The WPX LED wall packs are energy-efficient, cost-effective, and aesthetically appealing
full-cut off solution for both new construction and HID wall pack replacement/renovation
opportunities. Reliable IP66 construction and excellent LED lumen maintenance ensure a
long service life.
FEATURES:
¡ Architectural design at very economical prices
¡ Energy efficient - payback in less than two years
¡ Wide range of configuration options available
Luminaire CCT Lumens Input
Watts Photocell Finish Voltage Catalog Number CI Code UPC Pallet
qty.
Replaces
Up To
WPX0
SWW2
3000K/
4000K/
5000K
850 - 1,650 6.4-13W Switchable
On/Off
DARK
BRONZE 120-277V WPX0 LED ALO SWW2 MVOLT PE DDBXD M2 *276U4U 196182511806 280 70W Metal
Halide
WPX1 4000K 2,900 24W N/A DARK
BRONZE 120-277V WPX1 LED P2 40K MVOLT DDBXD M4 *265SWK 193048870589 160 150W Metal
Halide
WPX2
4000K 6,000 47W N/A DARK
BRONZE 120-277V WPX2 LED 40K MVOLT DDBXD M2 *265SX3 193048870756 120 250W Metal
Halide
5000K 6,000 47W N/A DARK
BRONZE 120-277V WPX2 LED 50K MVOLT DDBXD M2 *265SX6 193048870770 120 250W Metal
Halide
More configurations are available. Click here or visit www.acuitybrands.com and search for WPX LED.
Contractor Select™
Note : WPX3 lumen package and all the WPX configuration options are not included in
the Contractor Select program. For more information, please visit WPX LED .
Submitted by Enterprise Lighting, LTD.
Job Name:
Langus Mixed Use
Catalog Number:
WPX0 LED ALO SWW2 MVOLT PE
DDBXD M2
Notes:
Type:
OW2
ELL25-143233
Index Page1/2Submitted On: Nov 13, 2025
Page 40 of 251
One Lithonia Way, Conyers, GA 30012 | 1-800-705-7378 | www.lithonia.com
© 2020-2024 Acuity Brands Lighting, Inc. All rights reserved. Rev. 09/16/24 Page 2 of 2
CONTRACTOR SELECT WPX SERIES LED
INTENDED USE:
The WPX LED wall packs are designed to provide a cost-effective, energy-efficient solution for
the one-for-one replacement of existing HID wall packs. The WPX0, WPX1, WPX2 and WPX3
are ideal for replacing up to 70W, 150W, 250W, and 400W HID luminaires respectively. WPX
luminaires deliver a uniform, wide distribution. WPX is rated for -40ºC to 40ºC.
CONSTRUCTION:
WPX feature a die-cast aluminum main body with optimal thermal management that both
enhances LED efficacy and extends component life. The luminaires are IP66 rated, and sealed
against moisture or environmental contaminants.
ELECTRICAL:
Light engine(s) configurations consist of high-efficacy LEDs with a min LED lumen
maintenance of L86/100,000 hours. Color temperature (CCT) options of 3000K, 4000K and
5000K with minimum CRI of 70 (80 for WPX0). Electronic drivers ensure system power factor
>90% and THD <20%. All luminaires have 6kV surge protection (Note: WPX1 LED P1 package
and WPX0 comes with a standard surge protection rating of 2.5kV).
INSTALLATION:
WPX can be mounted directly over a standard electrical junction box. A port on the back
surface allows poke-through conduit wiring on surfaces that don't have an electrical junction
box. WPX1, WPX2 and WPX3 come with three 1/2 inch conduit ports on three sides that allow
for surface conduit wiring. Wiring can be made in the integral wiring compartment in all
cases. WPX is only recommended for installations with LEDs facing downwards.
LISTINGS:
CSA Certified to meet U.S. and Canadian standards. Suitable for wet locations. IP66 Rated.
DesignLights Consortium® (DLC) Premium qualified product and DLC qualified product. Not
all versions of this product may be DLC Premium qualified or DLC qualified. Please check
the DLC Qualified Products List at www.designlights.org/QPL to confirm which versions are
qualified.
WARRANTY:
5-year limited warranty. This is the only warranty provided and no other statements in this
specification sheet create any warranty of any kind. All other express and implied warranties
are disclaimed. Complete warranty terms located at: www.acuitybrands.com/support/
warranty/terms-and-conditions
Note: Actual performance may differ as a result of end-user environment and application.
All values are design or typical values, measured under laboratory conditions at 25°C.
Specifications subject to change without notice.
Specifications Dimensions
All dimensions are inches (centimeters) unless otherwise indicated.
Front View Side View
w D
u L ----
:::c:
<(
B
Luminaire Height (H) Width (W) Depth (D) Side Conduit Location WeightA B
WPX0 5.75”
(14.6 cm)
5.5”
(14.0 cm)
2”
(5.1 cm) N/A N/A 2.5 lbs
(1.1kg)
WPX1 8.1”
(20.6 cm)
11.1”
(28.3 cm)
3.2”
(8.1 cm)
4.0”
(10.3 cm)
0.6”
(1.6 cm)
6.1 lbs
(2.8kg)
WPX2 9.1”
(23.1 cm)
12.3”
(31.1 cm)
4.1”
(10.5 cm)
4.5”
(11.5 cm)
0.7”
(1.7 cm)
8.2 lbs
(3.7kg)
WPX3 9.5”
(24.1 cm)
13.0”
(33.0 cm)
5.5”
(13.7 cm)
4.7”
(12.0 cm)
0.7”
(1.7 cm)
11.0 lbs
(5.0kg)
Submitted by Enterprise Lighting, LTD.
Job Name:
Langus Mixed Use
Catalog Number:
WPX0 LED ALO SWW2 MVOLT PE
DDBXD M2
Notes:
Type:
OW2
ELL25-143233
Index Page2/2Submitted On: Nov 13, 2025
Page 41 of 251
1-800-548-3227
ANPlighting.com
2025 ANP Lighting™. Spec sheets are for general purposes only. Not all options are compatible – consult factory. Due to product
improvements, ANP reserves the right to make minor changes which do not effect the product’s overall performance or appearance.
Quantity:
Project Name:
Fixture Type:
Customer:
10312025 Page 1/4
Specifications A810
Material:
RLM shades are constructed of 12 gauge 1100
series spun aluminum. Wall back plate and driver
housing are cast aluminum, some types include a
spun metal cover. All fasteners are stainless steel.
Some washers may be galvanized. Inside of shade is
reflective white finish for all colors except galvanized
paint finish. Screw hardware may not match paint.
Drivers:
Universal voltage 120-277 is standard. 0-10V, TRIAC
and ELV dimming to 1% protocols are standard for
LED modules. (Refer to Driver Specification section
for other specifications.)
Electrical:
Approximately 6" of pull wire extends from luminaire.
All luminaires are prewired with 0-10V dimming
leads. Post Arms and Wall Mounts are also prewired
with line voltage & dimming leads.
Certifications:
Arm mount, stem mount and wall mount are UL Listed
for wet locations. LED Module is IP66.
Finish:
A polyester powder coat high quality finish. Marine
grade finish is available.
Modifications:
Consult factory for custom or modified designs.
Buy American:
This product is assembled in the USA and meets
the Buy America(n) government procurement
requirements under FAR, DFARS, and DOT
regulations. Click here for additional information.
A810 LED Weight: 1.0 lb.
Catalog Number
LIGHT SOURCE & WATTAGES
AM10W (10W ANP Module COB)
AM20W (20W ANP Module COB)
AM30W (30W ANP Module COB)
DISTRIBUTION
D (Dome Frosted Acrylic Wide Distribution Lens)
CCT (COLOR TEMPERATURE)
27K (2700K)
30K (3000K)
35K (3500K)
40K (4000K)
50K (5000K) Consult Factory
DRIVER HOUSINGS
Wall Mount Options
Choose Arm in Box 5
RTCW (Driver Housing for Wall only
(E-arms); 6 1/2" OD x 5 5/8" H)
SRTCW (Smooth Driver Housing for Wall only
(E-arms); 6" OD x 2 7/8" H)
RTCNCW (Driver Housing/No Spun Cover for Wall
only (E-arms); 5 7/8" OD x 2 5/8" H)
Stem Mount Options
Choose Stem Size in Box 5
ST-RTCC (Driver Housing for Stem only;
6 1/2" OD x 5 5/8" H)
ST-SRTCC (Smooth Driver Housing for Stem
only; 6" OD x 2 7/8" H)
ST-RTCNCC (Driver Housing/No Spun Cover for
Stem only; 5 7/8" OD x 2 5/8" H)
Emergency Backup Housing Options
Choose EMG Driver in Box 7
ST-DCCEM (Emergency Ballast Housing for
Stem only; 12" OD x 1 1/2" H)
*Driver Housing finish will match fixture finish.
MOUNTING SOURCES*
Arm Mounts
E3 E4 E6 E7 E8 E10 E11 E12
E15 E18 E25 E36
Wall Mounts
WM54 WM317
Stem Mounts
1/2" (13/16" OD) Rigid Stems 3/4" (1" OD) Rigid Stems
2ST6 2ST12 2ST18 3ST6 3ST12 3ST18
2ST24 2ST36 2ST48 3ST24 3ST36 3ST48
2ST60 2ST72 2ST96 3ST60 3ST72 3ST96
*Arm mount, Wall mount or Stem finish
will match fixture finish.
GLASS & GUARDS
100GLCL (Clear Glass)
100GLFR (Frosted Glass)
100GLPR (Prismatic Glass)
100GLCLGUP (Clear Glass & Small Wire Guard)
100GLFRGUP (Frosted Glass & Small Wire Guard)
100GLPRGUP (Pristmatic Glass & Small Wire Guard)
100GLCLGUPC (Clear Glass and Cast Guard)
100GLFRGUPC (Frosted Glass and Cast Guard)
100GLPRGUPC (Prismatic Glass and Cast Guard)
100GLGUP (Small Wire Guard with No Glass)
100GLGUPC (Small Cast Guard with No Glass)
*Cast and Wire Guard finish will match fixture.
MOUNTING ACCESSORIES
EMG-LEDR05 (5W, LED Emergency Driver, Remote
Placement up to 30', ANP Module Only,
Provided with Flexible Conduit)
EMG-LEDR7.8 (7.8W, LED Emergency Driver, Remote
Placement up to 30', ANP Module Only,
Provided with Flexible Conduit)
EMG-LEDR10.7 (10.7W, LED Emergency Driver, Remote
Placement up to 30', ANP Module Only,
Provided with Flexible Conduit)
EMG-LEDR17 (17W, LED Emergency Driver, Remote
Placement up to 30', ANP Module Only,
Provided with Flexible Conduit)
GR07 (7" Wire Grill)**
PC (Button Photo Cell) Remote Only
SC (Scroll for Arms)**
SLC (Sloped Ceiling Mount Canopy, 20° Max)**
SQ (Square Back Plate)**
SWL (Adjustable Locking Swivel)**
TBK (Turn Buckle Kit)**
*Most EM Packs are remote mount only (consult
factory). For percent lumens in emergency mode,
see Technical Section at www.ANPlighting.com
**Accessory finish will match fixture finish.
1Number
2Number
3Number
4Number
5Number
6Number
7Number
Specifications
A810 AM20W D 40K RTCW E6 100GLCL PC 41
RLM
RLM
Style
Light Source,
Wattage &
Dimming
Distribution CCT Driver
Housing
Mounting Glass/
Guard
Accessories Outside
Shade
Finish
Catalog Logic
10”
8 1/2”
11 21 31 41 51 61 71 81
A810
A810 AM20W D 40K RTCW E6 100GLCL PC 41
Submitted by Enterprise Lighting, LTD.
Job Name:
Langus Mixed Use
Catalog Number:
A810-AM10W-D-**K-E25
Notes:
Type:
OW3
ELL25-143233
*VERIFY*
*VERIFY*
Index Page1/4Submitted On: Nov 13, 2025
Page 42 of 251
1-800-548-3227
ANPlighting.com
2025 ANP Lighting™. Spec sheets are for general purposes only. Not all options are compatible – consult factory. Due to product
improvements, ANP reserves the right to make minor changes which do not effect the product’s overall performance or appearance.
Quantity:
Project Name:
Fixture Type:
Customer:
10312025 Page 2/4
Specifications A810
FINISHES
*Premium and Marine Grade Finish have additional charges
Standard
Colors
Standard
Grade
Marine
Grade*
Premium
Colors
Premium
Grade*
Marine
Grade*
Aspen Green 10 10M High Gloss Black 01 01M
Cantaloupe 11 11M Arctic Silver 14 14M
Lilac 12 12M Candy Apple Red 64 64M
Putty 13 13M Cobalt Blue 65 65M
Weathered Copper 29 29M Caramel 66 66M
Black 41 41M Butterscotch 67 67M
Forest Green 42 42M Black Silver 68 68M
Bright Red 43 43M Gunmetal Gray 69 69M
White 44 44M Mayan Gold 79 NA
Bright Blue 45 45M Textured Desert
Stone 80 80M
Sunny Yellow 46 46M Extreme Chrome 81 81M
Aqua Green 47 47M Graystone 82 82M
Galvanized 49 NA Oil Rubbed Bronze 83 83M
Navy 50 50M Carbon Graphite 96 96M
Architectural Bronze 51 51M
Consult Factory for additional paint charges and availability.
FINISHES
*Premium and Marine Grade Finish have additional charges
Standard
Colors
Standard
Grade
Marine
Grade*
Premium
Colors
Premium
Grade*
Marine
Grade*
Patina Verde 52 52M
Copper Clay 53 53M
Silver 56 56M
Black Verde 61 61M
Painted Chrome 70 70M
Painted Copper 71 71M
Textured Black 72 72M
Matte Black 73 73M
Textured Architectural
Bronze 76 76M
Textured White 77 77M
Textured Silver 78 78M
Consult Factory for additional paint charges and availability.
Finish
PERFORMANCE TABLE - ANP MODULE - INITIAL LUMENS
2700K 3000K 3500K 4000K
LED CATALOG WATTS DISTRIBUTION INITIAL
LUMENS lm/W B U G INITIAL
LUMENS lm/W B U G INITIAL
LUMENS lm/W B U G INITIAL
LUMENS lm/W B U G
AM10W 10W TYPE V 847 85 1 0 0 888 89 1 0 0 899 90 1 0 0 910 91 1 0 0
AM20W 20W TYPE V 1694 85 1 0 0 1777 89 1 0 0 1799 90 1 0 0 1820 91 1 0 0
AM30W 30W TYPE V 2541 85 1 0 0 2665 89 1 0 0 2698 90 1 0 0 2730 91 1 0 0
MODULE SPECIFICATION
• CREE XLAMP™ CMU
• Typical Efficacy 90 lm/W
• CCT: 2700K, 3000K, 3500K, 4000K
• CRI: 90 (min) 92 Typica
• 3-Step Ellipse
• Certifications: UL Recognized, RoHS, ENEC, REACH
DRIVER SPECIFICATION
• Universal Input: 120-277V
• Dimming: 0-10V, TRIAC, ELV (Dims to 1%)
• Power Factor @ Full Load >90%
• THD @ Full Load <20%
• Constant Current Output 50/60Hz
• Operating Temperature: -30°C Minimum
• Lifetime: >50,000 hours
• Ingress Protection: IP66
• Certifications: UL Recognized, CE, FCC, Energy Star, DLC, CA Title 24
FINISHES
• A polyester powder coat high quality finish is electro-statically applied and baked at 430° for exceptional
durability and color retention. Products undergo an intensive five-step cleansing and pretreatment process for
maximum paint adhesion.
• Marine grade finish provides superior salt, humidity and UV protection. This coating withstands up to 3,000
hours of continuous salt spray, comes with a 5-year warranty and is available in either a textured or gloss
surface.
WARRANTY
See www.ANPlighting.com for complete fixture warranty.
LED warranty information
• 5 year limited warranty*
• *Limited Warranty: A typical year is defined as 4,380 hours of operation.
Table Ends
8Number 8Number
Submitted by Enterprise Lighting, LTD.
Job Name:
Langus Mixed Use
Catalog Number:
A810-AM10W-D-**K-E25
Notes:
Type:
OW3
ELL25-143233
*VERIFY*
Index Page2/4Submitted On: Nov 13, 2025
Page 43 of 251
1-800-548-3227
ANPlighting.com
2025 ANP Lighting™. Spec sheets are for general purposes only. Not all options are compatible – consult factory. Due to product
improvements, ANP reserves the right to make minor changes which do not effect the product’s overall performance or appearance.
Quantity:
Project Name:
Fixture Type:
Customer:
10312025 Page 3/4
Specifications A810
ACCESSORIES
Tile
EMG-LED
GR07
PC
SLC
SQ
SWL
TBK
SC
POPULAR ARM MOUNTS Dimensions are Projection x Height | CB included with all arms Click here for all Arm Mount styles
Tile
E3 | 35" x 11 7/8"
E4 | 29" x 14"
E6 | 29" x 9 1/4"
E7 | 44 1/4" x 9 1/8"
E8 | 32 1/4" x 12 1/2"
E10 | 55 1/4" x 18"
E11 | 38 1/4" x 17 1/4"
E12 | 40 3/8" x 2"
E15 |16 3/8" x 10 1/2"
E18 | 30 3/4" x 21 3/8"
E25 | 26" x 5 1/4"
E36 | 23 1/4" x 8"
POPULAR WALL MOUNTS Dimensions are Projection x Height Click here for all Wall Mount styles
Tile
WM54 | 23 3/8" x 18"
WM317 | 15" x 12 3/4"
DRIVER HOUSINGS
Tile
RTCW
(6 1/2" OD x 5 5/8" H) Wall Only (E-arms)
RTCNCW
(5 7/8" OD x 2 5/8" H) Wall Only (E-arms)
SRTCW
(6" OD x 2 7/8" H) Wall Only (E-arms)
RTCC
(6 1/2" OD x 5 5/8" H)
RTCNCC
(5 7/8" OD x 2 5/8" H)
SRTCC
(6" OD x 2 7/8" H)
Submitted by Enterprise Lighting, LTD.
Job Name:
Langus Mixed Use
Catalog Number:
A810-AM10W-D-**K-E25
Notes:
Type:
OW3
ELL25-143233
Index Page3/4Submitted On: Nov 13, 2025
Page 44 of 251
1-800-548-3227
ANPlighting.com
2025 ANP Lighting™. Spec sheets are for general purposes only. Not all options are compatible – consult factory. Due to product
improvements, ANP reserves the right to make minor changes which do not effect the product’s overall performance or appearance.
Quantity:
Project Name:
Fixture Type:
Customer:
10312025 Page 4/4
Specifications A810
GLASS GUARD
Caret-Right Caret-Right CL = Clear Caret-Right FR = Frosted Caret-Right PR = Prismatic Caret-Right 100 = Small Caret-Right 200 = Large
Tile
Glass Only
6 1/2" H X 4 1/8" W
100GLCL
100GLFR
100GLPR
Glass with Cast Guard
7 1/2" H X 4 1/8" W
100GLCLGUPC
100GLFRGUPC
100GLPRGUPC
Glass with Wire Guard
7 1/2" H X 4 1/8" W
100GLCLGUP
100GLFRGUP
100GLPRGUP
GUPC Guard Only
7 1/2" H X 4 1/8" W
100GLGUPC (Cast Guard)
GUP Guard Only
7 1/2" H X 4 1/8" W
100GLGUP (Wire Guard)
FINISHES COLORS
/uni0057/uni0048/uni0049/uni0054/uni0045
/uni0054/uni0045/uni0058/uni0054/uni0055/uni0052/uni0045/uni0044/uni0020/uni0042/uni004C/uni0041/uni0043/uni004B
/uni0041/uni0053/uni0050/uni0045/uni004E/uni0020/uni0047/uni0052/uni0045/uni0045/uni004E
/uni0054/uni0045/uni0058/uni0054/uni0055/uni0052/uni0045/uni0044/uni0020/uni0057/uni0048/uni0049/uni0054/uni0045
/uni004D/uni0041/uni0054/uni0054/uni0045/uni0020/uni0042/uni004C/uni0041/uni0043/uni004B
/uni0042/uni0052/uni0049/uni0047/uni0048/uni0054/uni0020/uni0042/uni004C/uni0055/uni0045
/uni0053/uni0049/uni004C/uni0056/uni0045/uni0052
/uni0042/uni004C/uni0041/uni0043/uni004B
/uni004E/uni0041/uni0056/uni0059
/uni0050/uni0041/uni0049/uni004E/uni0054/uni0045/uni0044/uni0020/uni0043/uni0048/uni0052/uni004F/uni004D/uni0045
/uni0042/uni004C/uni0041/uni0043/uni004B/uni0020/uni0056/uni0045/uni0052/uni0044/uni0045
/uni0053/uni0055/uni004E/uni004E/uni0059/uni0020/uni0059/uni0045/uni004C/uni004C/uni004F/uni0057
/uni0050/uni0041/uni0049/uni004E/uni0054/uni0045/uni0044/uni0020/uni0047/uni0041/uni004C/uni0056/uni0041/uni004E/uni0049/uni005A/uni0045/uni0044
/uni0050/uni0041/uni0054/uni0049/uni004E/uni0041/uni0020/uni0056/uni0045/uni0052/uni0044/uni0045
/uni0043/uni0041/uni004E/uni0054/uni0041/uni004C/uni004F/uni0055/uni0050/uni0045
/uni0050/uni0055/uni0054/uni0054/uni0059/uni0050/uni0055/uni0054/uni0054/uni0059
/uni0057/uni0045/uni0041/uni0054/uni0048/uni0045/uni0052/uni0045/uni0044/uni0020/uni0043/uni004F/uni0050/uni0050/uni0045/uni0052
/uni0046/uni004F/uni0052/uni0045/uni0053/uni0054/uni0020/uni0047/uni0052/uni0045/uni0045/uni004E
/uni004C/uni0049/uni004C/uni0041/uni0043
/uni0054/uni0045/uni0058/uni0054/uni0055/uni0052/uni0045/uni0044/uni0020/uni0053/uni0049/uni004C/uni0056/uni0045/uni0052
/uni0041/uni0051/uni0055/uni0041/uni0020/uni0047/uni0052/uni0045/uni0045/uni004E
/uni0042/uni0052/uni0049/uni0047/uni0048/uni0054/uni0020/uni0052/uni0045/uni0044
/uni0050/uni0041/uni0049/uni004E/uni0054/uni0045/uni0044/uni0020/uni0043/uni004F/uni0050/uni0050/uni0045/uni0052
/uni0043/uni004F/uni0050/uni0050/uni0045/uni0052/uni0020/uni0043/uni004C/uni0041/uni0059
/uni0041/uni0052/uni0043/uni0048/uni0049/uni0054/uni0045/uni0043/uni0054/uni0055/uni0052/uni0041/uni004C/uni0020/uni0042/uni0052/uni004F/uni004E/uni005A/uni0045
/uni0054/uni0045/uni0058/uni0054/uni0055/uni0052/uni0045/uni0044/uni0020/uni0041/uni0052/uni0043/uni0048/uni0049/uni0054/uni0045/uni0043/uni0054/uni0055/uni0052/uni0041/uni004C
STANDARD PREMIUM
/uni0048/uni0049/uni0047/uni0048/uni0020/uni0047/uni004C/uni004F/uni0053/uni0053/uni0020/uni0042/uni004C/uni0041/uni0043/uni004B
/uni0043/uni0041/uni004E/uni0044/uni0059/uni0020/uni0041/uni0050/uni0050/uni004C/uni0045/uni0020/uni0052/uni0045/uni0044
/uni0043/uni004F/uni0042/uni0041/uni004C/uni0054/uni0020/uni0042/uni004C/uni0055/uni0045
/uni0042/uni0055/uni0054/uni0054/uni0045/uni0052/uni0053/uni0043/uni004F/uni0054/uni0043/uni0048
/uni0043/uni0041/uni0052/uni0041/uni004D/uni0045/uni004C
/uni0042/uni004C/uni0041/uni0043/uni004B/uni0020/uni0053/uni0049/uni004C/uni0056/uni0045/uni0052
/uni004D/uni0041/uni0059/uni0041/uni004E/uni0020/uni0047/uni004F/uni004C/uni0044
/uni0041/uni0052/uni0043/uni0054/uni0049/uni0043/uni0020/uni0053/uni0049/uni004C/uni0056/uni0045/uni0052
/uni0045/uni0058/uni0054/uni0052/uni0045/uni004D/uni0045/uni0020/uni0043/uni0048/uni0052/uni004F/uni004D/uni0045
/uni0047/uni0055/uni004E/uni004D/uni0045/uni0054/uni0041/uni004C/uni0020/uni0047/uni0052/uni0041/uni0059
/uni0043/uni0041/uni0052/uni0042/uni004F/uni004E/uni0020/uni0047/uni0052/uni0041/uni0050/uni0048/uni0049/uni0054/uni0045
/uni004F/uni0049/uni004C/uni0020/uni0052/uni0055/uni0042/uni0042/uni0045/uni0044/uni0020/uni0042/uni0052/uni004F/uni004E/uni005A/uni0045
/uni0047/uni0052/uni0041/uni0059/uni0053/uni0054/uni004F/uni004E/uni0045
/uni0054/uni0045/uni0058/uni0054/uni0055/uni0052/uni0045/uni0044/uni0020/uni0044/uni0045/uni0053/uni0045/uni0052/uni0054/uni0020/uni0053/uni0054/uni004F/uni004E/uni0045
Finishes
Submitted by Enterprise Lighting, LTD.
Job Name:
Langus Mixed Use
Catalog Number:
A810-AM10W-D-**K-E25
Notes:
Type:
OW3
ELL25-143233
Index Page4/4Submitted On: Nov 13, 2025
Page 45 of 251
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 1
Langhús on Main
Mixed Use Residential/Commercial Development
Infill Project
220 East Main Street, Mount Horeb
September 30, 2026
On behalf of the Owner and Developer, Jeff Grundahl, please accept this revised submittal for a
proposed mixed-use residential development at 220 East Main Street, Mount Horeb, WI.
Project Team:
Developer:
Jeff Grundahl, (or assigns)
455 S Junction Road
Madison, WI 53719
608-237-1730
jeff@jgdevelopment.com
Architect:
Sketchworks Architecture, LLC
Steve Shulfer, AIA, Partner|CEO
2501 Parmenter Street, suite 300A
Middleton, WI 53562
608-836-7570
sshulfer@sketchworksarch.com
Surveyor & Civil Engineer:
Wyser Engineering
Wade Wyse P.E.
312 E Main Street
Mount Horeb, WI 53572
608-843-3388
wade.wyse@wyserengineering.com
Property Manager:
The Gallina Companies
Dawn Hendrickson
101 East Main Street, Suite 500
Mount Horeb, WI 53572
608-237-1300
dhendrickson@gallinacos.com
Traffic Analysis
TADI (Traffic Analysis & Design, Inc.)
Don Lee, PE
PO Box 128
Cedarburg, WI 53012
414.517.5014
dlee@tadi-us.com
Page 46 of 251
Sketchworks Architecture, LLC | 2250 Parmenter St, Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 2
Land / Parcels:
There are three parcels on Main Street, Mount Horeb that are in consideration for this project:
• 208 E Main Street (currently vacant)
o BOECK'S, CARL SURVEY & PLAT MT HOREB STATION PLAT OF BLK 1-11
BLOCK 6 LOTS 5, 6, 7 & 8
• 214 E Main Street (currently a small commercial property, formerly residential)
o BOECK'S, CARL SURVEY & PLAT OF MT HOREB STATION PLAT BLOCK 6
LOTS 9, 10 & 11
• 220 E Main Street (currently a small commercial property, formerly residential)
o BOECK'S, CARL SURVEY & PLAT MT HOREB STATION PLAT OF BLK 1-11
BLOCK 6 LOTS 12, 13 & 14
Property size:
253.4’ x 125.3’ +/- (regular) = 31,653 square feet (0.73 acres)
Property Zoned as:
DMU - Downtown Mixed Use
Page 47 of 251
Sketchworks Architecture, LLC | 2250 Parmenter St, Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 3
Current Zoning assessment and Development needs:
This project reflects the desired zoned use for the site and activates a previously under utilized
section of the downtown Main Street. Accessible commercial tenant spaces along the Main
Street frontage blend into the established cadence of buildings throughout the street.
Key building statistics include:
• Three stories, 40’ tall
• 28,392 sf footprint
• 9,507 sf commercial + 730 sf lobby
• 37,241 sf residential
• Amenity spaces:
o 2,315 sf tenant private secure storage (second floor)
o 1,134 sf fitness center (second floor)
o 564 sf tenant community room (third floor)
o 2,818 sf tenant community outdoor patio
• 42 units
• 54 parking stalls, internal to the building
• 1.28:1 ratio of stalls to units; 1.08:1 ratio of stalls to bedrooms
• 49 bicycle parking stalls (38 wall, 11 floor)
Page 48 of 251
Sketchworks Architecture, LLC | 2250 Parmenter St, Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 4
In 2026, the Langhus on Main project has been redesigned to accomidate the recently updated
Municipal Zoning Code for Mount Horeb and requires no provisons or alterations to the code.
Significant building attributes modified since the previous submittal:
• Modified elevations to accomidate new zoning requirements
o Vertical articulation requirements for south façade
▪ Visually appears as eight individual buildings and storefronts, with a
maximum forty-foot width for each vertical articulation
▪ Introduced gabled roofline on south façade, additional material changes
and changes in the roof line to break up the façade and add interest to
the building
o Material changes, colors, and window sizing throughout
• Increased commercial square footage
o 1/3 of total buidling depth totaling to 9,515 SF
• Decreased number of apartment units
o 42 total units, originally 66 units, (11/25 submittal ~ 44)
• Added resident storage to second and third floors as convenience to tenants
• Parking garage modified to meet new zoning requirements
• Three story maximum height
o Original submittal included 4 stories
• Height reduced to 40-feet to meet new zoning requirements
• Increased community shared space to meet new zoning requirements
• Second floor expanded to utilize entire building footprint to allow for the following:
o Indoor work out space
o Residential storage units
o Increased MEP area
o Third floor outdoor space for better access to natural light
• Indoor communitiy room with kitchen
• Outdoor community patio with access to community room
o Tenant patios seperated by landscape planters
• Third floor at west end stepped back to in response to neighboring building concerns
• East façade introduces gabled elements at pedestrian level to ease into the
neighborhoods north of the site
• Northeast corner scaled back for better transition to North neighbors.
Bringing this corner to life with residents and consumers will activate more businesses in the
heart of downtown without additional parking constraints. Bike storage in the building
encourages use of alternative transportation and use of extablished bike paths in the area.
The shared community spaces will encourage residents to get to know their neighbors
furthering the sense of a belonging in the community.
Page 49 of 251
Sketchworks Architecture, LLC | 2250 Parmenter St, Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 5
Southeast Corner at Main St. & Third St.
Community Patio Space
Page 50 of 251
Sketchworks Architecture, LLC | 2250 Parmenter St, Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 6
Summary of Zoning Code Regulations: (adopted March 2026)
Code / Section Assessment
Section 17.02.10 DMU Downtown Mixed-Use Zoning District MEETS CRITERIA
Section 17.03.03(2) Number of Principal Buildings per Lot MEETS CRITERIA
Section 17.03.03(4) Number of Land Uses per Building MEETS CRITERIA
Section 17.03.03(9) Site Plan Review Required MEETS CRITERIA
Section 17.03.03(10) Procedural Regulations MEETS CRITERIA
Section 17.03.03(11) Demolition of a Principal Structure MEETS CRITERIA
Section 17.03.05 Table of Land Uses SEE MIXED USE BUILDING
Section 17.03.06 Residential Land Uses DEFAULT TO MIXED USE CRITERIA
Section 17.03.08(2) Mixed-Use Building MEETS CRITERIA AS A MIXED USE BUILDING
Section 17.03.08(a) MEETS CRITERIA DENSITY AND BULK REQMNTS
Section 17.03.08(b)1 DOESN’T APPLY, THIS IS IN DMU DISTRICT
Section 17.03.08(b)2a
MEETS ALL CRITERIA – NO RESIDENTIAL W/IN
35% LOT DEPTH
Section 17.03.08(b)2b MEETS ALL CRITERIA – LOBBY FROM MAIN ST
Section 17.03.08(b)2c
MEETS ALL CRITERIA – EXCEEDS GROUND LEVEL
MINIMUM
Section 17.03.08(b)2d
MEETS ALL CRITERIA – PARKING NOT IN 30 FOOT
AND 35% LOT DEPTH
Section 17.03.08(d) MEETS ALL CRITERIA
Section 17.04.12 Bulk Dimensions MEETS CRITERIA
Section 17.04.20 Height Exceptions
MEETS CRITERIA – SCREENING PARAPET <5’
ABOVE ROOF, ROOF 40’ MAX.
Section 17.06.06 Parking MEETS CRITERIA – > 1.2 STALLS PER D.U.
Section 17.06.07 Loading DMU DISTRICT, LOADING ZONE ON THIRD STREET
Section 17.06.20 Lighting LIGHTING PLAN MEETS ZONING REQUIREMENTS
Section 17.06.43 Recreation Space
MEETS CRITERIA – RECREATION SPACE
PROVIDED, CLUBHOUSE & PATIO
Section 17.07.01 Exterior Building Design MEETS CRITERIA
Section 17.07.50 DMU Design Standards MEETS CRITERIA
Article VIII Landscaping Requirements EXEMPT FROM LANDSCAPING REQUIREMENTS
Page 51 of 251
Sketchworks Architecture, LLC | 2250 Parmenter St, Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 7
Allowable Property Use:
Section 17.02.10: Zoning Districts
(12) (DMU) Downtown Mixed-Use Zoning District
(a) Intent. This district is intended to permit downtown commercial and mixed-use
development at an intensity which provides significant incentives for infill development,
redevelopment, and the continued economic viability of existing development in a
downtown development pattern that is compatible with traditional “Main Street”
characteristics of Downtown Mount Horeb. Residential uses are intended to occur at a
density that can be accommodated within the bulk requirements of this zoning district.
ASSESSMENT: MEETS CRITERIA
Section 17.02.22: Historic Preservation Overlay Zoning District
(No map found in Zoning Code or online in Village GIS mapping.)
Section 17.03.03: Regulations Applicable to All Land Uses
(2) Number of Principal Buildings per Lot
(b) …a maximum of one principal building shall be permitted on any one lot…
ASSESSMENT: MEETS CRITERIA
(4) Number of Land Uses per Building. Any number of land uses that are permitted by right can
be combined within a building or on a given lot, per the limitations of those individual uses. Any
number of land uses that require a conditional use permit can be combined within a building or
on a given lot, per the limitations of those individual uses and with each approved through the
conditional use process (Section 17.10.32).
ASSESSMENT: MEETS CRITERIA
(9) Site Plan Review Required. All development involving physical modifications to a site
including but not limited to new developments, building additions, alterations, or removal; and
additions to paving are subject to site plan review and approval in accordance with Section
17.10.43 of this Chapter, except for single family and two-family dwelling units in any zoning
district. The establishment of a Pocket Neighborhood land use requires Site Plan approval.
ASSESSMENT: MEETS CRITERIA
(10) Procedural Regulations and Requirements. All land use and development of land shall
comply with all requirements of Article X, pertaining to the procedures necessary to secure
review and approval of land use and development. Such regulations and restrictions address
Page 52 of 251
Sketchworks Architecture, LLC | 2250 Parmenter St, Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 8
both procedural and technical requirements.
ASSESSMENT: MEETS CRITERIA
(11) Demolition of a Principal Structure. Where a principal structure has been removed, all
driveways, paved areas, and below grade improvements on the lot shall be removed. All public
utilities shall be abandoned at their connection with the main unless written exception is
obtained from the Village Engineer. All demolition activities shall be in accordance with the
Village of Mount Horeb Municipal Code and all State and Federal regulations. Asbestos
abatement and removal of any other hazardous materials, when required, must be documented
before any demolition activity takes place. Applicant shall provide building inspector proof of
liability insurance. Proof of proper abandonment of all utilities and proof of notification of police
and public works as required. Applicant shall notify diggers hotline (dial 811) prior to
commencing any scraping, excavating, or boring.
ASSESSMENT: MEETS CRITERIA
Section 17.03.05: Table of Land Uses:
Downtown Mixed Use (DMU):
Permitted Uses: (only those relevant to this project are listed below)
Live/Work Unit
Mixed Use Building
Artisan Production Shop
Bed and Breakfast
Commercial Indoor Lodging
Commercial Kitchen
Indoor Commercial Entertainment
Indoor Maintenance Service
Indoor Sales of Services
Office
Personal or Professional Service
Communications Antenna
Electric Vehicle Charging
Home Occupation
Incidental Indoor Sales
Incidental Light Industrial
Incidental Outdoor Display and
Sales
On-Site Parking Lot
On-Site Structured Parking
Personal Antenna and Towers
Satellite Dish
Short-Term Residential Rental
Small Solar Energy System
Arbor/Trellis
Awning Canopy
Bay Window/Balcony
Eves dn Gutters
Fire Escape
Flagpole
Fountain
Garden, Residential Composting,
Raised Garden Bed, Landscape
Area, Rain Garden, or Bioswale
Mechanical Equipment
Patio/Freestanding or Detached
Deck
Refuse Enclosure
Walkway/Steps
Page 53 of 251
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 9
ASSESSMENT: SEE MIXED USE BUILDING
Section 17.03.06: Residential Land Uses
(1) Apartment/Multiplex: This dwelling unit type consists of a single structure with three or more
individual attached dwelling units.
ASSESSMENT: DEFAULT TO MIXED USE CRITERIA
Section 17.03.08: Mixed-Use Buildings
(2) Mixed-Use Building: A building containing a mix of principal nonresidential land uses and
principal residential land uses.
ASSESSMENT: MEETS CRITERIA AS A MIXED USE BUILDING
Regulations:
(a) Both uses are subject to the density, intensity, and bulk requirements of Article II.
ASSESSMENT: MEETS CRITERIA OF DENSITY AND ALL BULK REQUIREMENTS
(b) Land Use Minimums.
1. For any lot not located within the Downtown Mixed-Use District, …
ASSESSMENT: DOESN’T APPLY, THIS IS IN DMU DISTRICT
2. For any lot located within the Downtown Mixed-Use District, no residential land uses
are permitted on the ground floor unless such use is located a minimum of 30 feet or
35% of the lot depth as measured from the street right-of-way lot line directly abutting
Main Street, Front Street, South First Street, and South Second Street, whichever is
greater, as determined by the Plan Commission. See Figure 17.03.08b below.
a. Lots with multiple street frontages.
i. The minimum 30 foot or 35% lot depth requirement shall not be
required along any property line directly abutting a public or
private alleyway.
ASSESSMENT: MEETS ALL CRITERIA – NO RESIDENTIAL W/IN 35% LOT DEPTH
b. The lobby or entryway spaces intended for use by both residential and
nonresidential land uses shall be permitted within the 30 foot or 35% lot depth
requirement above.
ASSESSMENT: MEETS ALL CRITERIA – LOBBY FROM MAIN ST
c. Nonresidential land uses are permitted to exceed ground level minimums and
be located on any floor of the structure so long as the ground level minimum
requirement is met.
Page 54 of 251
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 10
ASSESSMENT: MEETS ALL CRITERIA – EXCEEDS GROUND LEVEL MINIMUM
d. For avoidance of doubt, parking is prohibited in the areas identified as
requiring nonresidential land uses.
ASSESSMENT: MEETS ALL CRITERIA – PARKING NOT IN 30 FOOT AND 35% LOT DEPTH
(c) Minimum and maximum required parking: See Section 17.06.06. (and shown below)
(d) Mixed-Use Buildings shall comply with the design standards for commercial and mixed-use
land uses. See Section 17.07.30. See Section 17.06.43 for on-site recreation space
requirements.
ASSESSMENT: MEETS ALL CRITERIA
Section 17.04.12 Table of Bulk Dimensions – Mixed Use Zoning Districts
Maximum Impervious Surface Percentage 100%
ASSESSMENT: MEETS CRITERIA
Maximum Lot Dwelling Unit Density None
ASSESSMENT: MEETS CRITERIA
Minimum Lot Area None
ASSESSMENT: MEETS CRITERIA
Minimum Lot Width None
ASSESSMENT: MEETS CRITERIA
Minimum Lot Frontage at Right of Way None
ASSESSMENT: MEETS CRITERIA
Minimum Front Yard and Street Side Corner Setback Min: 0 ft , Max: 10 ft
ASSESSMENT: MEETS CRITERIA
Minimum Side Yard Setback – Interior Min: 0 ft , Max: 10 ft
ASSESSMENT: MEETS CRITERIA
Minimum Rear Yard Min: 0 ft , Max: 10 ft
ASSESSMENT: MEETS CRITERIA
Maximum Building Height Max: 40 ft and 3 stories
(note 5’ added parapet and mechanical screening allowances)
ASSESSMENT: MEETS CRITERIA (3 stories, <40 ft, plus screening parapet)
Minimum Building Separation (same lot) See Building Code
ASSESSMENT: DOESN’T APPLY
Minimum Principal Dwelling Unit Structure Area See Building Code
ASSESSMENT: MEETS CRITERIA
Page 55 of 251
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 11
Minimum Front-Loaded Garage Setback Even w/ or behind principal Building
ASSESSMENT: MEETS CRITERIA
Minimum Pavement Setbacks 0 ft
ASSESSMENT: MEETS CRITERIA
Section 17.04.20: Exceptions to Maximum Height Regulations
(1) Minor Projections. The following are permitted to exceed the maximum height regulations
within any district where permitted: (text omitted that doesn’t apply)... The provisions of this
Chapter shall not apply to prevent the erection above the building height limit of a
parapet wall or cornice for ornament (and without windows) extending above such height
limit not more than 5 feet. Such features, however, shall be erected only to such height
as is necessary to accomplish the purpose they are to serve and subject to the
Wisconsin state building code.
(2) Additional Height for Roof Design or Non-Residential Space on the Ground Level. An
Apartment/Multiplex, Townhouse, Live/Work, or Mixed-Use Building may exceed the maximum
height regulations by up to a total of six (6) feet within any district where the land use is
permitted, if either of the following conditions is met:
(a) The structure is designed with a gable, hip, or gambrel roof with a pitch of at least
6/12.
(b) A Mixed-Use Building may increase the floor-to-ceiling height of the ground level, but
then the building is not eligible for additional height for roof design.
ASSESSMENT: MEETS CRITERIA – SCREENING PARAPET EXTENDS <5’ ABOVE ROOF
Parking requirements:
Section 17.06.06
Per “DMU, Downtown Mixed USe”:
Mixed Use: All Land Uses Per the minimum of each individual
land use
DMU Zoning
Land uses other than Residential None
Residential Land Uses 1.2 per dwelling unit
ASSESSMENT: MEETS CRITERIA – > 1.2 STALLS PER DWELLING UNIT
PARKING DIMENSIONAL STANDARDS MEET VILLAGE CRITERIA
Section 17.06.07: Off-Street Loading Standards
ASSESSMENT: DMU DISTRICT, LOADING ZONE ON THIRD STREET
Section 17.06.20: Exterior Lighting Standards
ASSESSMENT: LIGHTING PLAN MEETS ZONING REQUIREMENTS
Section 17.06.43: On-Site Recreational Space Requirements
Page 56 of 251
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 12
(1) On-Site Recreational Space Requirements for Multi-Family and Mixed-Use Land Uses.
(a) Each multi-family or mixed-use development containing 3 or more dwelling units shall
provide on-site recreational space suitable for inside or outside gathering space or
recreation. This space could include a children’s play area, outdoor gazebo or sitting
area, indoor gathering/community spaces, indoor fitness center, and/or shared outdoor
porch, balcony, or rooftop terrace. On-site recreational space may be provided at ground
level, in the building, or other areas including but not limited to communal
porches/decks, balconies, and rooftops.
(b) Minimum Area. A minimum of 200 square feet per building plus 25 square feet per
bedroom of usable recreation space shall be provided.
(c) Required on-site recreational space shall be for the private use of residents and need
not be open to the public.
(2) Required on-site recreational space may be divided into multiple distinct spaces, provided
that no single space is smaller than 100 square feet or narrower than 10 feet in any direction.
(3) The following will not count towards meeting the on-site recreational requirement:
(a) Outdoor areas in the required front yard or street side yard setbacks.
(b) Outdoor areas used for on-site parking or traffic circulation.
(c) Outdoor or indoor areas used for landscaping, stormwater infiltration, bicycle parking,
trash and recycling storage, or mechanical equipment.
(4) Required on-site recreational space shall not count toward land dedication or fee in lieu of
land dedication requirements of Village of Mount Horeb Ordinance Fee Schedule.
ASSESSMENT: MEETS CRITERIA – RECREATION SPACE PROVIDED, CLUBHOUSE &
PATIO
ARTICLE VII: EXTERIOR BUILDING DESIGN STANDARDS
Section 17.07.01: Purpose and Applicability
(1) Purpose. The purpose of this Section is to regulate the design and materials used for the
exterior of buildings and structures within the Village so as to maintain and enhance the
attractiveness and values of property in the community. This Article is further intended to
support the creation of a pedestrian-oriented urban environment that emphasizes architectural
and urban design principles of human scale and visual interest. Additionally, this Article is
intended to ensure the development of structures that maintain a long-lasting appearance;
withstand the effects of time and exposure to the elements; resist damage in areas with high
vehicular and pedestrian traffic and in areas where larger equipment that could cause damage
is commonly used; that maintain a consistent character of development based on land use and
zoning district particular to each development; and that contribute to the long-term economic
and social vitality of the Village of Mount Horeb.
(2) Applicability. Telecommunication, Extraction and Disposal, Energy Production, and
Agricultural land uses are exempt from the exterior design standards in Sections 17.07.10 to
17.07.50 below.
Page 57 of 251
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 13
(a) New Construction. The
requirements of this Section shall apply to all structures and buildings within the Village
constructed after the effective date of this Chapter.
(b) Additions. (omitted, doesn’t apply)
(c) Alterations. (omitted, doesn’t apply)
(d) Exceptions and Appeals.
1. Exceptions. Exceptions to the building design standards set forth in this
Section may be granted by the Zoning Administrator, to permit substitute building
materials or construction of comparable quality or design when it can be
demonstrated that the provisions of this Section are infeasible and that the
granting of such exception is in keeping with the purpose of this Section.
Decisions rendered by the Zoning Administrator may be appealed to the Plan
Commission.
2. Appeals. Any person affected by a decision of the Zoning Administrator may
petition for a hearing before the Plan Commission.
3. Waivers. The Plan Commission is authorized to grant one or more waivers for
specific design requirements in this Section when the Plan Commission finds the
design to constitute an exemption as described above in subsection (1) or finds
an alternative design standard also achieves the Purpose of this Section.
a. Granting of waivers by the Plan Commission shall be identified within
the conditions of approval as part of the design review component of any
Site Plan review (Section 17.10.43).
(e) Beyond the rules in this Section, additional building design standards may apply to:
1. Conditional Use Permits (see Section 17.10.32)
2. Planned Unit Development Districts (see Section 17.0.2.11)
(3) Review and Approval. Through the site plan review and building permit processes, the
Zoning Administrator shall be responsible and have authority to hear, review, and act upon all
proposed exterior architectural plans for all proposed development.
(4) Exterior Building Materials. The 4 classes of building materials referenced in this Chapter
have the following meanings:
(a) Class I materials include brick, brick veneer, stone, stone veneer, and glass
curtain/storefront).
(b) Class II materials include split face or decorative block, and stucco.
(c) Class III materials include architectural/decorative metal panels, EIFS, residential
aluminum siding, and siding made of wood, wood composite, vinyl, or fiber cement.
(d) Class IV materials include smooth face or non-decorative block; concrete panels (tilt-
up or precast); asphaltic, fiberglass, metal, or poly-roofing siding; non-decorative metal
panels; corrugated metal; and plywood, chipboard, or other non-decorative wood. Also
includes any material not listed in (a) through (c) above.
Any Exterior Change Within the Downtown Mixed Use Zoning District - See Section 17.07.50
ASSESSMENT: MEETS CRITERIA
Page 58 of 251
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 14
Section 17.07.50: DMU Zoning District Design Standards
These standards apply to any land use, building, and structure within the Downtown Mixed Use
zoning district constructed or altered after the effective date of this Chapter.
(2) Applicability. The regulations of this Section shall apply to new development and changes to
the exterior of any building within the mapped boundaries of the Downtown Mixed Use zoning
district.
(4) Design Theme: The design theme for the Downtown Mixed Use Zoning District is based on
its historical, pedestrian-oriented development pattern that incorporates retail, residential, and
institutional uses. Building orientation and character includes minimum setbacks at the edge of
the sidewalk, use of alleys for access (if possible), and on-street or other off-site parking. The
design theme is characterized by a variety of architectural styles popular at the time, including
Italianate, Romanesque, and Neoclassical, in formats with office, storage, or residential located
over commercial. The façades of these buildings have a traditional main street storefront
appearance that can vary in scale depending on location and surroundings, have street yard
and side yard setbacks of zero feet, have prominent horizontal and vertical patterns formed by
regularly spaced window and door openings, detailed cornice designs, rich detailing in masonry
coursing, window detailing and ornamentation, and are predominately brick, stone, or wood.
Exterior building materials are of high quality. Exterior appurtenances are minimal. Exterior
colors are harmonious, simple, and muted. Exterior signage blends, rather than contrasts, with
buildings in terms of coloring (complementary to building), location (on-building), size (small),
and number (few).
ASSESSMENT: MEETS CRITERIA
(5) Design Standards for Project Review (New Construction, Building Additions, and Building
Alterations).
(a) The design standards contained in this Subsection shall apply to all changes meeting
the criteria for Project Review (including all new buildings, building additions, and new
building appurtenances). Such activities shall correspond to the following:
1. The following requirements for building setback; height; building mass;
horizontal rhythms (created by the placement and design of façade openings and
related elements such as piers, columns); vertical rhythms (created by the
placement and design of façade details such as sills, transoms, cornices and
sign bands); roof forms; exterior materials; exterior surface features and
appurtenances; exterior colors; exterior signage; on-site landscaping; exterior
lighting; parking and loading area design; and the use of screening.
(b) Building Setback. Throughout the district, the setback of buildings from street yard
and side yard property lines shall conform to the design theme described in Subsection
(4) above, as determined by the Plan Commission.
1. No parking areas shall be located along any street frontage within the DMU
district, unless an exception is granted through the conditional use process
(Section 17.10.32).
ASSESSMENT: MEETS CRITERIA OF ZONING BULK REQUIREMENTS. PARKING AT
NORTH SIDE IS CONCEALED WITHIN BUILDING.
Page 59 of 251
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 15
(c) Building Height.
1. See Sections 17.04.11 to 17.04.14 for zoning district maximum height
requirements.
ASSESSMENT: MEETS CRITERIA
(d) Building Mass.
1. Throughout the district, the massing of buildings may vary depending on
location and surrounds, but shall conform to the design theme described in
Subsection (4) above, as determined by the Plan Commission.
2. The characteristic proportion (relationship between façade height and width) of
the design theme shall be maintained.
3. Building mass for large structures (with a façade area exceeding 5,000 square
feet) shall integrate façade articulations to conform to the design theme
described in Subsection (4), as determined by the Plan Commission.
ASSESSMENT: MEETS CRITERIA
(e) Façade Articulation. As determined by the Plan Commission, façade lengths shall not
be greater than 40 feet without articulation such as:
1. Recesses or projections that step back or project a portion of the main façade
plane.
2. Recesses or projections of upper floors from the ground floor façade plane.
3. Vertical division using different textures or materials.
4. Division of the façade into individual units through the use of windows,
entrances, arcades, porches, decks, balconies, lighting, or the incorporation of
traditional storefront design along the ground floor per Section 17.07.50(6)(e).
5. Roof form variation such as the inclusion of dormers, change in roof lines, or
change in roof type.
6. Public art installations located directly on a facade, such as murals (See
Chapter 12.075 of the Village of Mount Horeb Municipal Code for public art
standards).
ASSESSMENT: MEETS CRITERIA
(f) Horizontal Rhythms. The horizontal pattern of exterior building elements formed by
patterns of building openings for windows and doors, and related elements such as piers
and columns shall be spaced at regular intervals across all visible façades of the
building, and shall conform to the design theme described in Subsection (4) above, as
determined by the Plan Commission.
ASSESSMENT: MEETS CRITERIA
(g) Vertical Rhythms. The floor heights shall conform to the minimum and maximum
height
requirements of the DMU zoning district (Section 17.04.12). The rhythm of the ground
floor
shall harmonize with the rhythm of upper floors. The vertical pattern of exterior building
elements formed by patterns of building openings for windows and doors, and related
elements such as sills, headers, transoms, cornices and sign bands shall conform to the
design theme described in Subsection (4) above, as determined by the Plan
Commission.
Page 60 of 251
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 16
ASSESSMENT: MEETS CRITERIA
(h) Roof Forms. Flat or gently sloping roofs which are not visible from the street shall be
used.
Mansards or other exotic roof shapes not characteristic of the design theme described in
Subsection (4) above, as determined by the Plan Commission, shall not be used. See
Figure
17.07.50b.
ASSESSMENT: MEETS CRITERIA
(i) Exterior Materials. Selected building materials conform to the design theme described
in Subsection (4) above, a determined by the Plan Commission.
1. Masonry. Stone or brick facing shall be of even coloration and consistent size.
Cinder block, concrete block, concrete slab, or concrete panel shall not be
permitted.
2. Siding.
a. Wood, fiber cement, textured metal clapboard siding, or an alternative
appropriate high-quality siding material may be appropriate, particularly if
the proposed non-masonry exterior was used on a building which
conforms to the design theme described in Subsection (4) above, as
determined by the Plan Commission.
b. Clapboard or board and batten may be appropriate in certain instances
where used on the existing structure within the same block-face which
conforms to the design theme described in Subsection (4) above, as
determined by the Plan Commission.
c. Class IV materials are prohibited.
ASSESSMENT: MEETS CRITERIA
3. Glazing. Clear, or slightly tinted glass or related glazing material shall be used.
Mirrored glass, smoked glass, or heavily tinted glass shall not be permitted,
unless needed in a special situation as determined by the Plan Commission.
ASSESSMENT: MEETS CRITERIA
4. Colors. Pain colors used on exterior materials shall reflect the building’s era of
original construction, target era of restoration/renovation, and/or era of historical
significance. Applicants may choose their paint color choice within one of these
contexts. New construction paint colors should complement surrounding
structures.
a. Period-appropriate color palette examples include the Sherwin
Williams historic exterior collections.
ASSESSMENT: MEETS CRITERIA
(j) Exterior Surface. Exterior surface appurtenances shall conform to the design theme
described in Subsection (4) above, as determined by the Plan Commission.
1. The traditional storefront design theme (characterized by strong horizontal and
vertical rhythms formed by building openings, windows, and transom windows)
shall be employed for all new nonresidential buildings.
Page 61 of 251
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 17
2. Throughout the district,
avoid cluttering building façades with brackets, wiring, meter boxes, antennae,
gutters, downspouts and other appurtenances. Unnecessary signs shall also be
avoided. Where necessary, such features shall be colored so as to blend in,
rather than contrast, with the immediately adjacent building exterior. Extraneous
ornamentation which is inconsistent with the design theme described in
Subsection (4) above, as determined by the Plan Commission, is also prohibited.
ASSESSMENT: MEETS CRITERIA
(k) Awnings and Marquees. Awning and marquee size, color and placement shall
complement the architectural character of the building, as determined by the Plan
Commission.
1. Soft, weather-treated canvas or vinyl materials which allow for flexible or fixed
installation shall be used for awnings.
2. Aluminum or suspended metal canopies shall be permitted.
3. Signage applied to awnings shall be simple and durable.
4. Backlit awnings are prohibited.
ASSESSMENT: MEETS CRITERIA
(l) Exterior Lighting. On-building exterior lighting shall be compatible and harmonious
with the
design theme described in Subsection (4) above and Section 17.06.20, as determined
by the Plan Commission.
1. On-Building Lighting. The design, color, height, location, and light quality of all
on-building light fixtures shall be consistent for all light fixtures.
2. Ground-Mounted Lighting. The design, color, height, location and light quality
of ground-mounted lighting shall be consistent with the design theme described
in Subsection (4) above, as determined by the Plan Commission.
ASSESSMENT: MEETS CRITERIA
(m) Signage. See Article IX for all signage requirements.
ASSESSMENT: SIGNAGE TO BE SUBMITED AT A LATER DATE BY TENANTS
(n) Cleaning. Structural components and exterior materials shall be cleaned when
necessary, and with only the gentlest possible methods.
1. Low-pressure water, steam cleaning, and soft natural bristle brushes are
permitted.
2. Sandblasting and power washing (more than 400 psi) are prohibited.
3. Other methods shall be pre-approved by the Plan Commission.
(6) Design Standards for Design Alteration Review and Renovation Review (Changes to the
Exterior
Appearance of a Property). (OMMITTED, NOT APPLICABLE TO NEW BUILDING)
Page 62 of 251
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 18
ARTICLE VIII: LANDSCAPING REQUIREMENTS
Section 17.08.01: Purpose
The purpose of this Article is to establish landscaping requirements and other regulations
intended to preserve and maintain vegetation within in a manner that promotes the natural
resource protection, aesthetic, and public health goals of the Village.
Section 17.08.10: Applicability
(5) Exemptions.
(b) All land uses in the Downtown Mixed-Use District, Parks and Recreation
District, and Conservancy District are exempt from all landscaping requirements.
ASSESSMENT: EXEMPT FROM LANDSCAPING REQUIREMENTS
STORMWATER MANAGEMENT
Redevelopment site, compliant with Village and County requirements.
Page 63 of 251
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 19
Parking
The parking accommodations will include 54 total parking spaces on site. All of the stalls will be
at grade, secure, indoor parking, accessed from Third Street and will now exit only to alleyway
at the north in order to drive traffic to the stoplight. These will be reserved for residents and
business tenants of the building.
Parking Ratios:
• 54 parking stalls, internal to the building
• 1.28:1 ratio of stalls to units; 1.08:1 ratio of stalls to bedrooms
• 49 bicycle parking stalls (38 wall, 11 floor)
Refuse
A refuse room internal to the building will be provided to conceal trash and recycling dumpsters.
Access for removal will be provided at Third Street / the East end of the building.
Amenity Space
The tenants will have access to building amenities including: clubhouse, outdoor rooftop patio,
fitness room, conference room. The total areas of which are compliant with Village Code.
Outdoor Space
There will be a tenant rooftop patio amenity and clubhouse on the third floor. Private outdoor
balconies are provided for each dwelling unit. These balconies are either mounted tot eh exterior
wall, or recessed - refer to the building plans and elevations.
The first floor corner commercial space is intended to have outdoor seating, potentially for dining
use.
Page 64 of 251
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 20
Exterior Design
The goal of the development aesthetic is to compliment the historic Main Street appeal of Mount
Horeb. The materials used will be a combination of quality masonry (brick and stone), storefront
glazing and composite wood siding. Colors will be selected to complement the streetscape in
neutral, timeless, tones.
Exterior design features include:
• Vertical articulation is provided at a maximum of forty-foot spacing as required by
Village code
• The building is stepped back in areas at the upper floors to reduce the visual scale.
• Parking is concealed, in lieu of exposed surface parking
• A combination of brick, stone, and wood is used to vary the elevation and provide the
‘infill’ appearance common to most historic villages
• Landscape and decorative lighting will be used to enhance the aesthetic and experience.
• Outdoor spaces have been provided to activate the Main Street presence and provide for
tenant amenities
• Detail elements common to Mount Horeb are being introduced, such as recessed
balconies, large storefront windows, a combination of fabric and structured canopies,
brick pilasters, and wood sign-bands. All of these are found in historical context within
the Village of Mount Horeb.
The building height is three stories, and 40-feet. Additionally, the topography of the site slopes
nearly eight feet from south to north, creating a challenge for any building development.
Measured from grade, the exterior walls are approximately 32’ tall on the north side, and
typically a maximum of only 36 feet in height when measured along any grade at any side.
The building third-floor is stepped back at the North side for the outdoor patio amenity. It is also
stepped back at the West side to create spacing from the Mount Horeb Telephone Company.
The building section in the attached drawings illustrates the relative height relationships to Main
Street, the North alley, and refence points to the historic opera house building. It should be
noted that this proposed development is now shorter in height relative to the opera house, and
approximately the same height as the Village Hall.
Multiple elevations and renderings of the intended design are provided & attached. Materials
and colors are shown approximate and called out on the elevations.
Page 65 of 251
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 21
Stormwater Management
The redevelopment consideration of this property will not trigger a stormwater management
plan. Rainwater collected from hardscape and rooves will be directed to the Village stormwater
infrastructure.
There will be placement of rooftop stormwater retention trays to reduce runoff.
Utility Infrastructure Assessment
Initial discussions with Village staff and utility stakeholders have not produced any concern for
the development. Adequate supply for all utilities appears to be available, and the future design
submissions will accurately describe and design the necessary development infrastructure.
Traffic
A Traffic Impact Analysis (TIA) has been performed by Traffic Analysis and Design (TADI) of
Cedarburg, WI. A draft of the TIA report, dated August 14, 2025, has been forward separately
to Village Staff. This report indicates only a modest impact to the adjacent streets as caused by
this development.
Further, we have modified the indoor parking structure and interior traffic flow such that the 3rd
street will be “entrance only” and the NW corner will be “exit only”. This will then send traffic
directly to the 2nd street stoplight.
It will be up to the village to determine if the alley should be one way or two way traffic. The
developer is ok with either choice.
We are suggesting that the third street parking that exists today adjacent the building, be
modified such that it is for short term “Delivery parking” only. This will dedicate spots for retail
commercial deliveries and prevent long term parking near the intersection.
Gallina company additional studied the inflow/exit of two of their properties during the exact
same peak times the traffic analysis was done – results have been communicated previously.
• Hoff Mt Horeb, WI – 48 units
• LeSilve Middleton, WI – 180 units
Page 66 of 251
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 22
Adherence to the Comprehensive Plan
There are several objectives that the 2022 Comprehensive Plan (with amendments) seeks to
achieve. The following are examples of how this development
Foster New Housing Options:
• Provide a variety of housing types, densities, arrangements and costs to accommodate
the needs, desires and life cycles of existing and future residents.
o This proposed development will bring over forty new units of apartments within
Mount Horeb’s urban district.
• Increase the amount, type, and availability of affordable and workforce housing options
in the Village.
o While these units will be considered ‘market rate’, they provide a housing option
for those that may not wish to, or be able to, afford the single-family housing
ownership.
Grow the Local Economy:
• Strengthen and diversify the non-residential tax base and employment opportunities to
serve the day-to-day needs of residents.
• By adding commercial space and residential housing alike on underperforming real
estate, the downtown tax base will be improved, and there will be an improved means to
attract and retain businesses that enhance Mount Horeb’s desired character and
appearance.
o This development will enhance the downtown character and business climate
through new development of properties that have exceeded their lifespan.
• Cultivate independent small businesses and entrepreneurship opportunities in the
Village, especially in and around downtown.
o This development provides both housing and leasable commercial space for
small business and is vital to the livelihood of Main Street.
Page 67 of 251
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 23
An excerpt from the Comprehensive Plan
(Chapter Six: Land Use, page 43) supports the exact type of development our team is
proposing:
Central Mixed Use
This future land use category is intended for pedestrian-oriented commercial, office,
community facility, and upper story residential uses in a “downtown” setting, with on-
street parking and minimal building setbacks. The Central Mixed-Use land use category
includes the historic downtown area. The existing Village zoning district that is most
appropriate to implement this future land use category is the Central Business District
(CB).
• Policies and Programs:
1. Continue to implement the recommendations of the Downtown
Redevelopment Plan.
2. Promote downtown as a tourist, commercial, civic, and social center.
3. Work with downtown property owners and businesses to preserve,
renovate, modernize, and put to active use historically significant buildings.
4. Support the expansion, retention, and upgrading of specialty retail,
restaurants, financial services, offices, neighborhood retail and services, and
community uses.
5. Require that all projects submit and have approved detailed building
elevations and site plans, showing the proposed locations of the building(s),
parking, storage, loading, signage, landscaping, and lighting prior to
development approval.
6. Protect the unique quality of downtown by requiring buildings to be at least
two stories with a zero-lot line front setback.
7. Promote truly mixed-use development with residential above the first floor
and design oriented to pedestrian and not automobiles.
The Comprehensive Plan discusses a desire to create housing diversity for empty-nesters,
young professionals, and new families, the project’s target demographic. This same plan seeks
to “Foster Redevelopment, Reinvestment, and (promote) New Development”.
“Environmental Sustainability and Stewardship” is also a stated goal of the Plan. By creating
more density in this pedestrian friendly location, the impact to utility services, sprawling land
use, environmental pollutants, and needless consumption of natural habitat is minimized.
Simply put, this type of development, with this type of density, is smart.
We believe this well-placed mixed use development not only reinforces the downtown Main
Street corridor, it extends the useable area by nearly ¾ of a block, Lastly, it aids in reducing
urban sprawl through a smart, dense, and walkable land use.
Page 68 of 251
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 24
Conclusion
Community engagement on this project has been incredible, and the developer has gone great
lengths to address and mitigate every concern brought forth.
We firmly believe that this mixed-use infill development should be approved as it strengthens
the heart of downtown and Main Street, and positions the community for long-term vitality. So
many community’s downtowns die for lack of attention to their main street business districts:
lack of business, lack of walkability (a condition of sprawl), and lack of residential density
downtown. This project resolves all of these risks by bringing daily activity to the village center,
supporting local businesses and creating a walkable, engaging environment – a huge economic
and benefit, particularly when compared to the current land use (vacant lot, two old converted
retail buildings).
In addition to the enhanced and diversified tax base, this project ensures that Main Street
remains vibrant and economically resilient for decades to come. It is an investment in Mount
Horeb’s future character, livability, and sustained success!
Our team has been working tirelessly to accommodate Village feedback while ensuring a viable
project. We thank you for your consideration of this exciting development in Mount Horeb, we
look forward to continued discussion and collaboration!
Respectfully submitted
Steve Shulfer, AIA
Sketchworks Architecture, LLC
Page 69 of 251
Page 70 of 251
Page 71 of 251
Page 72 of 251
Page 73 of 251
Page 74 of 251
Page 75 of 251
Page 76 of 251
P.O. Box 128
Cedarburg, WI 53012
800.605.3091
www.tadi-us.com
Main Street
Residential/Mixed-Use
Development
Traffic Impact Analysis
Village of Mt Horeb
Dane County, Wisconsin
September 22, 2025
Page 77 of 251
TADI
Phone: 800.605.3091 PO Box 128 www.tadi-us.com
Cedarburg, WI 53012
PROVIDING TRAFFIC ENGINEERING SOLUTIONS
TRAFFIC IMPACT ANALYSIS
DATE: September 22, 2025
TO: Jeff Grundahl
214 E. Main LLC
FROM: Don Lee, P.E.
John A Bieberitz, P.E., PTOE
Traffic Analysis & Design, Inc.
SUBJECT: Main Street Residential/Mixed-Use Development
214-220 E. Main Street
Village of Mt. Horeb, Dane County, WI
INTRODUCTION
A residential/mixed-use development is being proposed to be located on the north side of Main
Street/State Trunk Highway (STH) 78 between North 2nd Street and North 3rd Street in the
Village of Mt. Horeb, Dane County, Wisconsin (Exhibit 1). Access to the site is proposed via
two full access driveway connections: one onto North 3rd Street and one onto the adjacent
residential alley located immediately north of the proposed building (Exhibit 2A). This traffic
impact analysis (TIA) report was prepared to address the weekday morning and weekday
evening peak hour traffic impacts of the proposed development traffic on the adjacent
transportation system.
STUDY AREA
Study Intersections
The study area for this TIA includes the following existing and proposed intersections:
• Main Street with North 2nd Street (traffic signal control)
• Main Street with North 3rd Street (two-way stop control)
• North 2nd Street with Alley (two-way stop control)
• Alley with Proposed North Access Driveway (one-way stop control)
• North 3rd Street with Proposed East Access Driveway (one-way stop control)
Each intersection is shown on the study area map on Exhibit 1 and the site plan on Exhibit 2A. A
transportation detail illustrating existing intersection lane configurations and speed limits is
shown in Exhibit 3.
Study Area Roadways
Main Street is a two-lane undivided east/west principal arterial with a posted speed limit of 25
miles per hour (mph). According to WisDOT, the Year 2024 annual average daily traffic
Page 78 of 251
Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin
Page 2 of 11
September 22, 2025
volumes (AADTs) on Main Street were approximately 8,900 vehicles per day (vpd) immediately
west of North 2nd Street, 10,000-vpd to the west of North 3rd Street and 9,100-vpd (2025 count)
to the east of North 3rd Street. Sidewalks and parallel parking are currently provided along both
sides of Main Street within the limits of the study area.
2nd Street is a two-lane undivided major collector with a posted speed limit of 25-mph. The Year
2022 WisDOT AADT volumes on 2nd Street were 1,300-vpd immediately south of Main Street.
No WisDOT AADT is currently available to the north; however, ADT volumes of approximately
900-vpd were interpolated from six hours of peak period turning movement counts taken as part
of this study. Sidewalks and parallel parking are currently provided along both sides of North 2nd
Street, immediately north of Main Street. Sidewalks are also currently provided along both sides
of South 2nd Street, immediately south of Main Street and angle parking is provided along only
the west side of the street to the south of Main Street.
3rd Street is a two-lane undivided major collector with a posted speed limit of 25-mph. The Year
2022 WisDOT AADT volumes on 3rd Street were 400-vpd immediately south of Main Street. No
WisDOT AADT is currently available to the north; however, ADT volumes of approximately
300-vpd were interpolated from six hours of peak period turning movement counts taken as part
of this study. Sidewalks are currently provided along both sides of 3rd Street, immediately north
of Main Street and parallel parking is provided along only the west side of the street to the north
of Main Street. Sidewalks and parallel parking are also currently provided along only the west
side of South 3rd Street, immediately south of Main Street.
DATA COLLECTION
Existing Traffic Counts
Weekday morning (6:00 to 9:00 a.m.) and weekday evening (3:00 to 6:00 p.m.) turning
movement traffic counts were conducted by TADI in early August of 2025 at the 2nd Street
intersections with Main Street and the north alley and with the 3rd Street intersection with Main
Street.
Based on the turning movement traffic counts, the peak traffic hours at the study intersections
were determined to occur from 7:15-8:15 a.m. (AM peak hour) and from 4:15-5:15 p.m. (PM
peak hour). The traffic volume counts were compiled for these peak hours and are shown on
Exhibit 4 as the “Existing Traffic Volumes”. The full traffic count data collected for this study,
showing calculated peak hour factors and percentage of heavy trucks, is included in Appendix A.
In addition, a Wavetronix radar counter was placed along the north alley between North 2nd
Street and North 3rd Street to record the existing hourly and daily volumes along the alley. The
count was conducted in early August of 2025. The counters recorded data from midday on
Tuesday, August 5th through midday on Thursday, August 7th. The output for the counter has
also been included in Appendix A. Based on the count, the ADT along the Alley between 2nd
Street and 3rd Street is approximately 70 vehicles per day.
PROPOSED DEVELOPMENT
Site Description
The proposed residential/mixed-use development is expected to include 65 apartment units made
up of studio, one-bedroom and two-bedroom units on floors two through four (Exhibit 2B) and a
Page 79 of 251
Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin
Page 3 of 11
September 22, 2025
parking garage (68 stalls) and a commercial space provided on the first floor. Access to the site is
proposed via two full access driveway connections: one onto North 3rd Street and one onto the
adjacent residential alley located immediately north of the proposed building (Exhibit 2A). The
residential/mixed-use development is planned to be constructed and operational next year and is
therefore included in the Full Build (with development) traffic volumes.
Trip Generation
To address any potential future traffic impacts at the study area intersections, it is necessary to
identify the hourly volume of traffic generated by anticipated development. Traffic volumes
expected to be generated are based on the size and type of the proposed uses and on trip rates and
fitted curve equations as published in the Institute of Transportation Engineers’ (ITE) Trip
Generation Manual, 11th Edition. Even though the building is expected to be four floors (one
commercial plus three residential), the ITE land use code (LU230) “Low-Rise Residential with
Ground-Floor Commercial, 2-3 floors (1-25K)” was utilized for this study in lieu of LU231
“Mid-Rise Residential with Ground-Floor Commercial, 4-10 floors (1-25K)” as a worst case
(highest volume) traffic condition. A comparison table is provided in Appendix B.
Due to the nature of the land use type, the proposed development is not expected to include
linked trips or pass-by trips. Linked trips occur when a motorist visits one or more tenants or
land use within a development site. Pass-by trips occur when motorists already on the roadway
system stop at the site prior to continuing on their intended route. Internal linked trips between
the residential and commercial land uses are already included in the ITE rates used.
The trip generation table developed for the proposed residential/mixed-use development is
shown on Exhibit 5A. As shown, the proposed development is expected to generate about 220
total trips (110 in/110 out) over a typical weekday, with 30 new trips (5 in/25 out) expected
during the weekday AM peak hour and 25 trips (20 in/5 out) expected during the weekday PM
peak hour.
Pedestrians and bicyclists may use their respective modes to access the proposed
residential/mixed-use development ; however, to allow for a conservative (highest vehicular
volume) analysis, these modes were assumed to make up a relatively small portion of the overall
trips to/from the study area. For the purpose of this TIA, all trips to/from the proposed
development site were assumed to occur via motor vehicle.
Trip Distribution
The trip distribution for the proposed development, listed below and shown in table format in
Exhibit 5A and graphically in Exhibit 5B, was determined based on the existing traffic count
patterns, the type of proposed land uses and the location of existing populations within the
immediate study area.
• 48% to/from the east on Main Street
• 43% to/from the west on Main Street
• 2% to/from the north on 2nd Street
• 7% to/from the south on 2nd Street
Page 80 of 251
Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin
Page 4 of 11
September 22, 2025
Traffic Assignment
Per direction from the Village of Mt. Horeb, two access scenarios were evaluated as part of
this study. The two access scenarios are as follows:
• Scenario 1 – Access to the site is proposed via two full access driveways
with the alley operating under two-way operation.
• Scenario 2 - Access to the site is proposed via two full access driveways
with the alley operating under one-way westbound operation.
The proposed development new trips for the two respective access scenarios were
assigned to the study intersections based on the above trip distributions. The traffic
assignment for the two respective access scenarios is shown on Exhibits 6A&B.
The new trips under Scenario 1 (Exhibit 6A) were added to the Existing traffic volumes
(Exhibit 4) to generate the “Full Build (Scenario 1)” traffic volumes. The “Full Build
(Scenario 1)” traffic volumes are shown on Exhibit 7A.
The new trips under Scenario 2 (Exhibit 6B) were added to the Existing traffic volumes
(Exhibit 4) to generate the “Full Build (Scenario 2)” traffic volumes. The “Full Build
(Scenario 2)” traffic volumes are shown on Exhibit 7B.
PEAK HOUR TRAFFIC OPERATIONS & QUEUES
The study intersections were analyzed using the Synchro 12 traffic analysis model (outputs based
on the Highway Capacity Manual, 7th Edition) and the peak hour turning movement volumes
estimated for the study area intersections. Intersection operation is defined by “level of service.”
Level of Service (LOS) is a quantitative measure that refers to the overall quality of flow at an
intersection ranging from very good, represented by LOS ‘A,’ to very poor, represented by LOS
‘F.’ For the purposes of this study, LOS D or better was used to define acceptable peak hour
operating conditions. The LOS descriptions for signalized and unsignalized intersections are in
Table 1.
Page 81 of 251
Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin
Page 5 of 11
September 22, 2025
Table 1. LOS Descriptions
The capacity analysis tables in the following sections show the peak hour LOS, delays (in
seconds per vehicle), and queues (in feet) for the Existing traffic condition and for both of the
access scenarios under the Full Build traffic condition. The Synchro capacity analysis
worksheets for all analysis scenarios are located in Appendix D.
Existing Traffic Operations
Table 2 shows the results of the weekday morning and weekday evening peak hour operational
analysis at the existing study area intersections. The existing study intersections were evaluated
using the existing geometrics and traffic control as shown on Exhibit 3, and the Existing traffic
volumes shown in Exhibit 4.
Signalized Intersections Unsignalized Intersections
Control Delay/Vehicle Avg. Control Delay Relative
LOS (sec/veh) (sec/veh) Delay
≤10 ≤10
> 10 - 20 > 10 - 15
> 20 - 35 > 15 - 25
> 35 - 55 > 25 - 35
> 55 - 80 > 35 - 50
> 80 > 50
Source: Highway Capacity Manual, Transportation Research Board, Washington, D.C., 2010
F Long
DelaysExtremely low speeds. Intersection congestion. Long delays. Extensive
traffic queues at intersections.
A
Short
Delays
Free-flow traffic operations at avearge travel speeds. Vehicles completely
unimpeded in ability to maneuver. Minimal delay at signalized intersections
B Reasonably unimpeded traffic operations at average travel speeds. Vehicle
maneuverability slightly restricted. Low traffic delays.
C Stable traffic operations. Lane changes becoming more restricted. Travel
speeds reduced to half of average free flow travel speeds. Longer
D
Moderate
Delays
Small increases in traffic flow can cause increased delays. Delays likely
attributable to increased traffic, reduced signal progression, and adverse
E Significant delays. Travel speeds reduced to one-third of average free flow
travel speed.
Page 82 of 251
Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin
Page 6 of 11
September 22, 2025
Table 2. Existing Traffic Peak Hour Operations
As shown in Table 2, all turning movements at the existing study area intersections are currently
operating acceptably at LOS D or better during the weekday morning and weekday evening peak
hours under the Existing traffic volume conditions.
Full Build Traffic Operations
The proposed site access driveways were evaluated with stop control on the development
site approaches. Tables 3 and 4 show the results of the weekday morning and weekday
evening peak hour operational analysis at the study area intersections with the proposed
development fully built out under the two respective access scenarios. The study
intersections were evaluated using the Full Build traffic volumes under the two respective
access scenarios as shown in Exhibits 7A&B.
I/S
LOS &
↗ → ↘ ↙ ← ↖ ↖ ↑ ↗ ↘ ↓ ↙ Delay
LOS
Delay
Queue
LOS
Delay
Queue
LOS A
Delay 8.9
Queue
LOS A
Delay 8.3
Queue
LOS
Delay
Queue
LOS
Delay
Queue
(-) indicates a movement that is prohibited or does not exist; (*) indicates a freeflow movement.
Delay is reported in seconds. Queue is the maximum of the 50th & 95th percentile queue, measured in feet.
25' 25' 25' 25'
PM
A A B D
9.2 8.5 12.4 29.1
Two-Way Stop Control
7.9 8.9 13.2 18.6
Node 300: 3rd Street &
Main Street
25' 25' 25' 25'
AM
A A B C
Lanes-> 1 1 1 1
125' 285' 85' 65'
PM
A A D D
3.3 5.3 36.8 35.8
Traffic Signal Control
3.8 3.1 36.7 34.9
Node 200: 2nd Street &
Main Street
150' 85' 90' 55'
AM
A A D C
Lanes-> 1 1 1 1
25' 25' 25' 25'
PM
A A A A
8.9 9.2 7.3 7.3
Two-Way Stop Control
8.9 9.2 7.3 7.3
25' 25' 25' 25'
AM
A A A A
Southbound
Node 100: 2nd Street &
Alley
Lanes-> 1 1 1 1
Intersection
Peak
Hour Metric
Level of Service (LOS) per Movement by Approach
Eastbound Westbound Northbound
Page 83 of 251
Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin
Page 7 of 11
September 22, 2025
Table 3. Full Build (Scenario 1 – Alley Two-Way Traffic)
Traffic Peak Hour Operations
I/S
LOS &
↗ → ↘ ↙ ← ↖ ↖ ↑ ↗ ↘ ↓ ↙ Delay
LOS
Delay
Queue
LOS
Delay
Queue
LOS A
Delay 9.2
Queue
LOS A
Delay 8.3
Queue
LOS
Delay
Queue
LOS
Delay
Two-Way Stop Control v/c
Queue
- -
LOS - -
Delay - -
Queue - -
LOS - -
Delay - -
Queue - -
- -
LOS - -
Delay - -
Queue - -
LOS - -
Delay - -
Queue - -
(-) indicates a movement that is prohibited or does not exist; (*) indicates a freeflow movement.
Delay is reported in seconds. Queue is the maximum of the 50th & 95th percentile queue, measured in feet.
25' - 25' *
PM
A - A *
8.5 - 7.3 *
One-Way Stop Control
8.5 - 7.3 *
Node 500: East Driveway &
3rd Street
25' - 25' *
AM
A - A *
Lanes-> 1 - 1 1
* 25' 25' -
PM
* A A -
* 7.2 8.5 -
One-Way Stop Control
* 7.2 8.7 -
Node 400: North Driveway &
Alley
* 25' 25' -
AM
* A A -
Lanes-> 1 1 1 -
- - 0.14
25' 25' 25' 25'
PM
A A B E
9.3 8.5 12.4 36.6
-
Two-Way Stop Control
8.0 8.9 13.2 19.4
Node 300: 3rd Street &
Main Street
25' 25' 25' 25'
AM
A A B C
Lanes-> 1 1 1 1
130' 285' 85' 65'
PM
A A D D
3.4 5.3 36.8 35.8
Traffic Signal Control
3.8 3.1 36.6 35.2
Node 200: 2nd Street &
Main Street
150' 90' 90' 65'
AM
A A D D
Lanes-> 1 1 1 1
25' 25' 25' 25'
PM
A A A A
8.9 9.2 7.3 7.3
Two-Way Stop Control
8.9 9.3 7.3 7.2
25' 25' 25' 25'
AM
A A A A
Southbound
Node 100: 2nd Street &
Alley
Lanes-> 1 1 1 1
Intersection
Peak
Hour Metric
Level of Service (LOS) per Movement by Approach
Eastbound Westbound Northbound
Page 84 of 251
Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin
Page 8 of 11
September 22, 2025
Table 4. Full Build (Scenario 2 - Alley One-Way Westbound Traffic)
Traffic Peak Hour Operations
As shown in Tables 3 and 4, with the additional traffic from the proposed development,
regardless of the access scenario, all turning movements at the study intersections are
expected to continue to operate acceptably at LOS D or better during the weekday morning
and weekday evening peak hours except the southbound movements at the Main Street
intersection with 3rd Street which are expected to operate at slightly higher delays under the full
build traffic volume conditions under either access scenario. Delays for the southbound
movements are expected to be about 2 to 3 seconds over the LOS D industry standard of 35
seconds during the weekday evening peak hour. The southbound movements are expected to be
1.6 seconds over the LOS D threshold under access Scenario 1 and 2.5 seconds over the LOS D
threshold under access Scenario 2. It is noted that, regardless of the access scenario, the volume
to capacity ratio (v/c) for this southbound movement during the weekday evening peak hour is
I/S
LOS &
↗ → ↘ ↙ ← ↖ ↖ ↑ ↗ ↘ ↓ ↙ Delay
LOS
Delay
Queue
LOS
Delay
Queue
LOS A
Delay 9.2
Queue
LOS A
Delay 8.3
Queue
LOS
Delay
Queue
LOS
Delay
Two-Way Stop Control v/c
Queue
- -
LOS - -
Delay - -
Queue - -
LOS - -
Delay - -
Queue - -
- -
LOS - -
Delay - -
Queue - -
LOS - -
Delay - -
Queue - -
(-) indicates a movement that is prohibited or does not exist; (*) indicates a freeflow movement.
Delay is reported in seconds. Queue is the maximum of the 50th & 95th percentile queue, measured in feet.
25' - 25' *
PM
A - A *
8.5 - 7.3 *
One-Way Stop Control
8.5 - 7.3 *
Node 500: East Driveway &
3rd Street
25' - 25' *
AM
A - A *
Lanes-> 1 - 1 1
* 25' 25' -
PM
* A A -
* 7.2 8.6 -
One-Way Stop Control
* 7.2 8.7 -
Node 400: North Driveway &
Alley
* 25' 25' -
AM
* A A -
Lanes-> 1 1 1 -
- - 0.14
25' 25' 25' 25'
PM
A A B E
9.3 8.5 12.5 37.5
-
Two-Way Stop Control
8.0 8.9 13.2 19.4
Node 300: 3rd Street &
Main Street
25' 25' 25' 25'
AM
A A B C
Lanes-> 1 1 1 1
130' 280' 85' 65'
PM
A A D D
3.4 5.2 36.8 35.8
Traffic Signal Control
3.8 3.1 36.6 35.2
Node 200: 2nd Street &
Main Street
150' 85' 90' 65'
AM
A A D D
Lanes-> 1 1 1 1
25' 25' 25' *
PM
A A A *
8.9 9.2 7.3 *
Two-Way Stop Control
8.8 9.2 7.3 *
25' 25' 25' *
AM
A A A *
Southbound
Node 100: 2nd Street &
Alley
Lanes-> 1 1 1 1
Intersection
Peak
Hour Metric
Level of Service (LOS) per Movement by Approach
Eastbound Westbound Northbound
Page 85 of 251
Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin
Page 9 of 11
September 22, 2025
only 0.14 (or less than 1/7th intersection capacity). See gap study discussion in the next section of
this report.
In addition, queues for any movement at the study area intersections are expected to increase by
1 vehicle or less regardless of the access scenario and, with the exception of the aforementioned
southbound movements at the Main Street intersection with 3rd Street, delays for any specific
movement at the study area intersections are expected to increase by 1 second or less. Therefore,
to provide for full access at all intersections during all hours of the day, providing two-way
operation along the north alley, as shown under access Scenario 1, is recommended.
GAP STUDY ANALYSIS
Because the model showed slightly higher delays for the southbound movements at the Main
Street intersection with 3rd Street, a gap analysis was completed at this intersection during the
typical weekday morning and weekday afternoon peak hours to document the existing gaps in
the east/west traffic stream and to estimate the potential availability of gaps under the full build
traffic conditions.
During the weekday AM and PM peak hours, the length of gaps, in time, between vehicles
traveling along Main Street (at 3rd Street) were counted. Critical gap and follow-up times for
vehicle turning movements were calculated based on the Highway Capacity Manual (HCM)
equations 17-1 and 17-2. These equations include adjustment factors for heavy vehicles, grade,
divided roadways, and intersection geometry. The gap analysis worksheet calculations and
compiled gap counts are located in Appendix C.
Equivalent gaps (or capacity of gaps) are calculated by adding the number of gaps available for
only one vehicle to turn, gaps long enough for two vehicles to turn, and gaps long enough for
three vehicles to turn (without counting the same gaps twice). The equivalent gaps represent the
number of additional turning movements that could be made beyond the existing turning
movements already occurring. Table 5 summarizes the findings of the gap study for the Main
Street intersection with 3rd Street during the typical weekday peak hours. The table shows the
equivalent gaps calculated from the field counts, the net new site trips assigned to the turning
movements at the intersection, and the excess gaps available for additional turning movements
above those numbers.
Table 5. Traffic Gap Study: Main Street Intersection with 3rd Street
Intersection Direction
Peak
Hour
Equivalent
Gaps
Net New
Site Trips
Excess
Gaps
Main Street & 3rd Street
AM 243 5 238
PM 140 0 140
AM 105 10 95
PM 51 5 46
AM 321 0 321
PM 235 10 225EB Left Turn from Main Street
SB Right Turn from 3rd Street
SB Left Turn from 3rd Street
Page 86 of 251
Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin
Page 10 of 11
September 22, 2025
As shown in Table 5, there are anywhere from 46 to 320 excess gaps along Main Street during
the AM or PM peak periods for additional turning movements beyond the existing traffic and site
new trip traffic assigned to the Main Street intersection with 3rd Street. These excess gaps
confirm the analysis output showing acceptable delays and queues at this intersection with the
Full Build traffic volumes. It is noted that the Main Street signalized intersection at 2nd Street
assists in the creation of these gaps in the Main Street traffic stream.
RECOMMENDATION MODIFICATONS
Recommended modifications are expected to be necessary at the study area intersections to allow
for acceptable and safe operations under the Full Build traffic volume conditions, as shown in
Exhibit 8 and detailed below. Modifications are for jurisdictional consideration and are not
legally binding. The Village of Mt. Horeb reserves the right to determine alternative solutions.
Node 100: 2nd Street with Alley
• Existing Traffic: No modifications
• Full Build Traffic: No modifications
Node 200: 2nd Street with Main Street
• Existing Traffic: No modifications
• Full Build Traffic: No modifications
Node 300: 3rd Street with Main Street
• Existing Traffic: No modifications
• Full Build Traffic: No modifications
Node 400: Proposed North Driveway with Alley
• Existing Traffic: Not applicable
• Full Build Traffic:
o Provide a full access driveway connection onto the alley as shown on the
conceptual site plan.
o Provide stop sign control on the south approach.
Node 500: Proposed East Driveway with 3rd Street
• Existing Traffic: Not applicable
• Full Build Traffic:
o Provide a full access driveway connection onto 3rd Street as shown on the
conceptual site plan.
o Provide stop sign control on the west approach.
Slightly higher delays which are expected at the Main Street intersection with 3rd Street during
the typical weekday evening peak hour under the full build traffic volume conditions. However,
since the delays are only slightly (about 2-3 second) over the LOS D threshold and queue lengths
for exiting southbound vehicles are expected to be reasonable (about 1 vehicle), and with
Page 87 of 251
Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin
Page 11 of 11
September 22, 2025
reasonable capacity ratios and traffic signals located immediately to the west that creates gaps in
the mainline east/west traffic stream, the intersection is expected to operate safely under full
build conditions.
In addition, if angle parking is desired along the alley north of the proposed development,
operations along the alley corridor are not expected to be adversely impacted since very low
volumes (approximately 70 vehicles per day) were recorded along this corridor on a typical
weekday. Angle parking could be implemented, and safe operations would be expected, if
designed per typical industry standards.
CONCLUSION
Based on the projected traffic volumes and with the recommended modifications as shown on
Exhibit 8, the proposed access driveways are expected to operate acceptably under full build
conditions with the aforementioned modifications recommended in this study. All movements at
the study area intersections are expected to operate safely and efficiently with the planned
geometric and traffic control conditions depicted in this TIA through the opening year and with
full buildout and full occupancy of the proposed development.
Appendices
Appendix A – Traffic Counts
Appendix B – Trip Generation Comparison
Appendix C – Gap Analysis
Appendix D – Existing & Full Build Traffic Synchro Analysis
Page 88 of 251
3516: 9-22-25
N
NOT TO SCALE
EXHIBIT 1
PROJECT OVERVIEW MAP
MT HOREB, WISCONSIN
Study Area Intersection
On-Site Development
LEGEND
Page 89 of 251
3516: 9-22-25
N
NOT TO SCALE
EXHIBIT 2A
CONCEPTUAL SITE PLAN
COMMERCIAL/PARKING (FIRST FLOOR)
MT HOREB, WISCONSIN
Page 90 of 251
3516: 9-22-25
N
NOT TO SCALE
EXHIBIT 2B
CONCEPTUAL SITE PLAN
APARTMENTS (2ND THROUGH 4TH FLOORS)
MT HOREB, WISCONSIN
Page 91 of 251
3516: 9-22-25
N
NOT TO SCALE
EXHIBIT 3
EXISTING TRANSPORTATION DETAIL
MT HOREB, WISCONSIN
Traffic Signal Control
Stop Sign Control
Existing Lane Configuration
Distance Between Roadways (in Feet)
LEGEND
3rd Street
SPEED
LIMIT
25
Main Street
2nd Street
3rd Street
Alley
SPEED
LIMIT
25
SPEED
LIMIT
25
SPEED
LIMIT
25
XX’
40’
165’
415’
Page 92 of 251
3516: 9-22-25
N
NOT TO SCALE
EXHIBIT 4
YEAR 2025 EXISTING TRAFFIC VOLUMES
MT HOREB, WISCONSIN
(10) 10
(15) 15
(5) 5
5 (15)
(5) 10
AM Peak Hour (7:15 - 8:15 AM)
PM Peak Hour (4:15 - 5:15 PM)
Negligible Traffic Volumes (Fewer than 3 vph)
2025 Annual Average Daily Traffic (AADT)
LEGEND
XX
(XX)
-
X,XXX
- ( - )
30 (30)
- ( - )
North Driveway East Driveway
8,900
Alley
3rd Street
2nd Street
Main Street 10,000
X,XXX 2024 Annual Average Daily Traffic ( )AADT
2022 Annual Average Daily Traffic (AADT)
1,300
400
(20) 15
10 (15)
270 (640)
35 (10)
(5) 5
(455) 485
( - ) 15
15 (10)
(30) 20
(5) 5
(45) 65
15 (20)
230 (575)
30 (50)
(5) 10
(380) 400
(10) 20
10 (20)
- (5)
40 (35)
3rd Street
9,100
(5) -
( - ) 5
(15) 15
- ( - )
- ( - )
5 (15)
5 (5)
10 (5)
( - ) -
(70) 10
X,XXX
Page 93 of 251
3516: 9-22-25
N
NOT TO SCALE
EXHIBIT 5A
ON-SITE TRIP GENERATION & DISTRIBUTION TABLES
MT HOREB, WISCONSIN
In Out Total In Out Total
220 5 25 30 20 5 25
(3.44) (23%) (77%) (0.44) (71%) (29%) (0.36)
220 5 25 30 20 5 25
TRIP DISTRIBUTION (New Trips)
East on Main Street 48% 110 5 10 10 5
West on Main Street 43% 90 0 10 10 0
North on 2nd Street 2% 0 0 0 0 0
South on 2nd Street 7% 20 0 5 0 0
100% 220 5 25 20 5
Exhibit 5A
On-Site Trip Generation Table1
1ITE Trip Rates (X.XX) and/or Fitted Curve Equations (FCE) are from the ITE Trip Generation Manual, 11th Edition.
Total New Trips
PM Peak
Low-Rise Residential with Ground-Floor
Commercial (2-3 Floors) (1-25k) 230 65 Units
Land Use
ITE
Code Proposed Size
Weekday
Daily
AM Peak
Page 94 of 251
3516: 9-22-25
N
NOT TO SCALE
EXHIBIT 5B
TRIP DISTRIBUTION DIAGRAM
MT HOREB, WISCONSIN
43%
7%
2%
North Driveway East Driveway
Alley
3rd Street
2nd Street
Main Street
Proposed Trip Distribution
LEGEND
XX%
48%
Page 95 of 251
3516: 9-22-25
N
NOT TO SCALE
EXHIBIT 6A
ON-SITE NEW TRIPS
ALLEY - TWO WAY TRAFFIC
MT HOREB, WISCONSIN
( - ) 10
10 ( - )
(15) 5
North Driveway East Driveway
(5) 15
Alley
3rd Street
2nd Street
Main Street
5 (10)
(5) -
5 ( - )
10 (5)
5 ( - )
(5) -
(5) -
5 ( - )
5 ( - )
3rd Street
(5) -
(5) -
Peak Hour (7:15 - 8: )AM 15 AM
Peak Hour (4:15 - 5:15 PM)PM
Negligible Traffic Volumes (Fewer than 3 vph)
LEGEND
XX
(XX)
-
Page 96 of 251
3516: 9-22-25
N
NOT TO SCALE
EXHIBIT 6B
ON-SITE NEW TRIPS
ALLEY - ONE WAY (WESTBOUND) TRAFFIC
MT HOREB, WISCONSIN
( - ) 10
10 ( - )
(20) 5
North Driveway East Driveway
(5) 15
Alley
3rd Street
2nd Street
Main Street
5 (10)
(10) -
5 ( - )
10 (5)
5 ( - )
(10) -
5 ( - )
5 ( - )
Peak Hour (7:15 - 8: )AM 15 AM
Peak Hour (4:15 - 5:15 PM)PM
Negligible Traffic Volumes (Fewer than 3 vph)
LEGEND
XX
(XX)
-
3rd Street
Page 97 of 251
3516: 9-22-25
N
NOT TO SCALE
EXHIBIT 6C
REDISTRIBUTED TRIPS
ALLEY - ONE WAY (WESTBOUND) TRAFFIC
MT HOREB, WISCONSIN
(5) 5
North Driveway East Driveway
Alley
3rd Street
2nd Street
Main Street
5 (5)
-5 (-5)
(-5) -10
-5 (-5)
( - ) 5
( - ) -5
5 (5)
Peak Hour (7:15 - 8: )AM 15 AM
Peak Hour (4:15 - 5:15 PM)PM
Negligible Traffic Volumes (Fewer than 3 vph)
LEGEND
XX
(XX)
-
3rd Street
(5) 5
(-5) -5
Page 98 of 251
3516: 9-22-25
N
NOT TO SCALE
( - ) 10
( - ) -
(15) 5
(20) 15
North Driveway East Driveway ( - ) -
(5) 15
Alley
3rd Street
2nd Street
Main Street
15 (25)
270 (640)
35 (10)
(10) 5
(455) 485
( - ) 15
10 (5)
20 (10) 15 (20)
235 (575)
30 (50)
(10) 10
(385) 400
(10) 20
15 (20)
5 (5)
40 (35)
3rd Street
Peak Hour (7:15 - 8: )AM 15 AM
Peak Hour (4:15 - 5:15 PM)PM
Negligible Traffic Volumes (Fewer than 3 vph)
LEGEND
XX
(XX)
-
(10) 10
(15) 15
(10) 5
- ( - )
- ( - )
15 (15)
(5) -
( - ) 5
(15) 15
- ( - )
30 (30)
- ( - )
( - ) -
(70) 10
(30) 20
(5) 5
(45) 65
EXHIBIT 7A
FULL BUILD TRAFFIC VOLUMES
ALLEY - TWO WAY TRAFFIC
MT HOREB, WISCONSIN
- ( - )
15 (10)
(5) 10
(5) -
5 (15)
- ( - )
Page 99 of 251
3516: 9-22-25
N
NOT TO SCALE
EXHIBIT 7B
FULL BUILD TRAFFIC VOLUMES
ALLEY - ONE WAY (WESTBOUND) TRAFFIC
MT HOREB, WISCONSIN
( - ) 10
North Driveway East Driveway
Alley
3rd Street
2nd Street
Main Street
20 (30)
265 (635)
35 (10)
(15) 5
(455) 485
( - ) 15
10 (5)
20 (10) 10 (15)
235 (575)
35 (50)
(5) 10
(390) 400
(10) 20
15 (20)
5 (5)
40 (35)
3rd Street
Peak Hour (7:15 - 8: )AM 15 AM
Peak Hour (4:15 - 5:15 PM)PM
Negligible Traffic Volumes (Fewer than 3 vph)
LEGEND
XX
(XX)
-
(10) 10
(15) 15
( - ) -
- ( - )
- ( - )
15 (15)
(5) 5
( - ) -
(15) 15
- ( - )
20 (30)
- ( - )
( - ) -
(70) 10
(30) 20
(5) 5
(45) 65
10 (20)
- ( - )
( - ) -
(5) 15
- ( - )
15 (10)
(20) 5
(25) 20
Page 100 of 251
3516: 9-22-25
N
NOT TO SCALE
EXHIBIT 8
RECOMMENDED MODIFICATIONS
MT HOREB, WISCONSIN
North Driveway East Driveway
Alley
3rd Street
2nd Street
Main Street
LEGEND
XX’
Traffic Signal Control
Stop Control
Storage Length (In Feet)
Existing Lane Configuration
Proposed Modifications
BLUE
Provide driveways
as shown on site plan
Page 101 of 251
3516: 9-22-25
N
NOT TO SCALE
APPENDIX B
TRIP GENERATION COMPARISON TABLE
MT HOREB, WISCONSIN
In Out Total In Out Total
220 5 25 30 20 5 25
(3.44) (23%) (77%) (0.44) (71%) (29%) (0.36)
Not 5 10 15 5 5 10
Available (23%) (77%) (0.22) (71%) (29%) (0.17)
0 15 15 15 0 15
Appendix
Trip Generation Comparison Table1
Land Use
ITE
Code Proposed Size
Weekday
Daily
AM Peak PM Peak
Low-Rise Residential with Ground-Floor
Commercial (2-3 Floors) (1-25k) 230 65 Units
Mid-Rise Residential with Ground-Floor
Commercial (4-10 Floors) (1-25k) 231 65 Units
Difference
1ITE Trip Rates (X.XX) and/or Fitted Curve Equations (FCE) are from the ITE Trip Generation Manual, 11th Edition.
Page 102 of 251
Main Street Residential/Mixed-Use Development – Mt Horeb, Wisconsin
Appendix A
Traffic Counts
Turning Movement Counts
Wavetronix Daily Count
Page 103 of 251
Version 2025.03 Page 1 of 13
Base Information, Observed (6) Hour and Estimated (24) Hour Volume Summaries
Major St: 2nd Street
Minor St: Alley
2nd Street & Alley
Site Information Count Information
SW-M
↑
AM MD PM
AM MD PM
0.877 2.359
Company Name 1.000
Comments
Observed 6 Hour Volume Summary
6
PED: 15 BIKE: 2
7 145 2 0
PED: 1 PED:
38 61 3
33
0
↑
0 North
7
BIKE: 6 BIKE:
18 6 2
11 47 67 12
PED: 5 BIKE: 3
Estimated 24 Hour AADT
14 300 4 0
2
12
68
0
↑
0 North
14
12
178
Daily/Seasonal Factor 0.877 23 97 139 25
Count Expansion Factor 2.359
Manual Adjustment Factor 1.000
Total 24 Hr Expansion Factor 2.070
7:15-8:15am
North Leg 2nd Street
Clear and Dry
Clear and Dry
AM Peak Period
Weather
Wednesday, August 6, 2025
Wednesday, August 6, 2025
Midday Peak Period
PM Peak Period Tuesday, August 5, 2025
Peak Hours Selected for Analysis
Calculated Peak Hours
Clear and Dry
West Leg Alley
South Leg 2nd Street 7:00-8:00am
Traffic Control Partial Stop Control
AM Peak Period
Midday Peak Period
PM Peak Period
Miovision
Miovision
Observers
Special Pedestrians Observed
None
None
Manual Adj.
Elementry school age children
Pre-school children
TADI
Mioribion
60
Other (describe) None None
TOTAL ENTERING VOLUME
None
Wis DOT Daily & Seasonal Factors are final for 2012 through 2024,
and 2025 uses 2024 final factors.
None
NoneWheelchairs/electric scooters
Elderly/disabled (except wheelchairs)
Visually impaired (white cane/helper dog)
20
75
40
Alley
275
137
412
319
2nd Street
569
284
853
155
83
124
Roadway Names North Direction
4:15-5:15pm
4:00-5:00pm
124
Alley
41
890
TOTAL ENTERING VOLUME
430
154
60
Alley
329
2nd Street
ESTIMATED 2nd Street
Total Entering Hourly Volume
Alley
159
99
Count Basics
Schools Not in Session
1st Day of Count Tuesday, August 5, 2025
No Special Events
Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Start Date:
County
Intersection of:
WisDOT Region13 - Dane
Weekday
Non-Holiday
Municipality Village of Mt Horeb Hrs Counted: 06:00 AM-09:00 AM and 03:00 PM-06:00 PM
Intersection Traffic Volume Report
Special Considerations
East Leg Alley
Holidays None
Special Events None
(1) Non-Interstate Low Truck %Count Expansion Group
Daily/Seasonal Adjustment Factor
Schools Not in Session
Count Expansion Factor
(1) Non-Interstate Low Truck %Daily/Seasonal Adjustment Group
24 HOUR AADT 474
HOUR VOLUMES 229
OBSERVED 2nd Street
205
24 83 50 000000
77 102 94
0
0
1,000
6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM
Motor Vehicle
Volume
One-Hour Time Period Start Time (Ex: 6am represents volume from 6am to 7am)
Page 104 of 251
Page 2 of 13
Peak Hour Volume Graphical Summary
2nd Street & Alley
AM Peak Hour Summary
PED: 4 BIKE: 0
1 30 0 0 Manual Adj. 1.000
PED: 0 PED:
3 02
2
0
↑
0 North
0
BIKE: 3 BIKE:
11 7 0
11 01 3 4
PED: 0 BIKE: 0
Midday (MD) Peak Hour Summary
PED: 0 BIKE: 0
0 0 0 0 Manual Adj. 1.000
PED: 0 PED:
0 00
0
0
↑
0 North
0
BIKE: 0 BIKE:
00 0
00 0 0
PED: 0 BIKE: 0
PM Peak Hour Summary
PED: 4 BIKE: 0
1 25 0 0 Manual Adj. 1.000
PED: 0 PED:
14 02
13
0
↑
0 North
3
BIKE: 0 BIKE:
01 7 2
3 9 15 3
PED: 2 BIKE: 1
Count Basics
Start Date: Tuesday, August 5, 2025
Total Number of Hours Counted: 6
2nd Street
58
30
88
0
0
0
0
16
20 3
Weekday
Non-Holiday
All Motor Vehicles
13
Alley
26
18
TOTAL ENTERING VOLUME
89
2nd Street
0
Alley
0
0
7
TOTAL ENTERING VOLUME
Alley
10
PM PEAK HOUR 2nd Street
4:15-5:15pm 44
30
Alley
0
0
0
0 0
0
MD PEAK HOUR
78
2nd Street
2nd Street
50
28
Intersection Traffic Volume Report
Wednesday, August 6, 2025
N/A
Tuesday, August 5, 2025
Schools Not in Session
No Special Events
AM PEAK HOUR 2nd Street TOTAL ENTERING VOLUME
7:15-8:15am 44 81
31
13
11
Alley
2
Alley
31
9
20
Page 105 of 251
Count Basics Page 3 of 13
Peak Hour Volume Summary
2nd Street & Alley
Peak Hour Volumes, Truck Percentages, and PHFs
AM Peak Hour 2nd Street Alley 2nd Street Alley
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals
7:15 AM 0 13 0 0 13 0 0 0 0 0 2 4 1 1 8 2 1 0 0 3 24
7:30 AM 1 5 0 0 6 0 0 0 0 0 1 5 2 0 8 3 1 0 0 4 18
7:45 AM 0 5 0 0 5 0 0 2 0 2 1 3 6 0 10 9 0 0 0 9 26
8:00 AM 0 7 0 0 7 0 0 0 0 0 0 1 1 0 2 3 1 0 0 4 13
Peak Hour Volume 1 30 0 0 31 0 0 2 0 2 4 13 10 1 28 17 3 0 0 20 81
Rounded Hourly Volume 0 30 0 0 30 0 0 0 0 0 5 15 10 0 30 15 5 0 0 20 80
% Single Unit Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0 0.0 0.0
% Heavy Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0
% Trucks (Total) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0 0.0 0.0
Peak Hour Factor (PHF) 0.25 0.58 0.00 0.00 0.60 0.00 0.00 0.25 0.00 0.25 0 .50 0.65 0.42 0.25 0.70 0.47 0.75 0.00 0.00 0.56 0.78
MD Peak Hour 2nd Street Alley 2nd Street Alley
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Peak Hour Volume 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Rounded Hourly Volume 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
% Single Unit Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0 0.0 0.0
% Heavy Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0
% Trucks (Total) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0 0.0 0.0
Peak Hour Factor (PHF) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 .00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PM Peak Hour 2nd Street Alley 2nd Street Alley
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals
4:15 PM 0 5 0 0 5 0 0 3 0 3 2 3 1 2 8 5 0 0 0 5 21
4:30 PM 0 6 0 0 6 0 0 7 0 7 1 3 4 0 8 4 0 0 0 4 25
4:45 PM 1 6 0 0 7 0 0 1 0 1 0 5 1 1 7 5 0 2 0 7 22
5:00 PM 0 8 0 0 8 0 0 2 0 2 0 4 3 0 7 3 0 1 0 4 21
Peak Hour Volume 1 25 0 0 26 0 0 13 0 13 3 15 9 3 30 17 0 3 0 20 89
Rounded Hourly Volume 0 25 0 0 25 0 0 15 0 15 5 15 10 5 35 15 0 5 0 20 95
% Single Unit Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0 0.0 0.0
% Heavy Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0
% Trucks (Total) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0 0.0 0.0
Peak Hour Factor (PHF) 0.25 0.78 0.00 0.00 0.81 0.00 0.00 0.46 0.00 0.46 0 .37 0.75 0.56 0.37 0.94 0.85 0.00 0.37 0.00 0.71 0.89
Peak Hour Pedestrian and Bicyclist Volumes
Pedestrians and Bicyclists Total
Ped &
2nd Street Alley 2nd Street Alley Bike
15-Minute Start Time Total Total Total Total Volume
7:15 AM 1200 3
7:30 AM 1002 3
7:45 AM 1002 3
8:00 AM 1000 1
Total 4204 1 0
12:00 PM 0000 0
12:15 PM 0000 0
12:30 PM 0000 0
12:45 PM 0000 0
Total 0000 0
4:15 PM 2304 9
4:30 PM 0011 2
4:45 PM 0104 5
5:00 PM 2025 9
Total 4 4 3 14 25
All Motor Vehicles
From West
From South From West
Weekday
West Approach
From South
From South From West
Non-Holiday
Schools Not in Session
No Special Events
Start Date: Tuesday, August 5, 2025
Total Number of Hours Counted: 6
AM
0
0
0
0
0
4
Bicyclist Pedestrian
Crossing
From North From East
From North From East
From East
Bicyclist
Wednesday, August 6, 2025
N/A
1
1
1
Pedestrian
1
0
Bicyclist
00
Pedestrian Bicyclist
CrossingCrossing
South Approach
Pedestrian
AM Peak HourMidday (MD) Peak Hour
From North
Tuesday, August 5, 2025
Crossing
North Approach
PM Peak Hour
East Approach
00
0
00
20
00
20
0
00 0000 0
00
20
11
00
31
00
00
00
00 0000 00
MD
00 00 00 00
00 00 00 0
0
00 0000 00
04
PM
20 2
00 0
40 2
00 0
20 0
Intersection Traffic Volume Report
0
001
022 1 1 4
11 50
4
0
10 10
0
0
10
Page 106 of 251
Count Basics Page 4 of 13
Hourly Volume Summary - Motor Vehicle Data
2nd Street & Alley
One-Hour Motor Vehicle Data
One-Hour Total
Time Period 2nd Street Alley 2nd Street Alley Vehicle
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume E/W N/S
6:00 AM 0 9 0 0 9 0 0 1 0 1 0 3 1 0 4 8 1 1 0 10 24 11 13
7:00 AM 2 29 0 0 31 0 0 2 0 2 5 14 11 1 31 16 2 1 0 19 83 21 62
8:00 AM 0 17 0 0 17 0 1 5 0 6 0 4 8 4 16 10 1 0 0 11 50 17 33
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 2 31 1 0 34 1 2 6 0 9 1 12 7 1 21 10 1 2 0 13 77 22 55
4:00 PM 1 34 1 0 36 0 1 11 0 12 4 18 9 3 34 18 0 2 0 20 102 32 70
5:00 PM 2 25 0 0 27 0 2 8 0 10 2 16 11 2 31 24 1 1 0 26 94 36 58
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7 145 2 0 154 1 6 33 0 40 12 67 47 11 137 86 6 7 0 99 430 139 291
Volume Totals
Non-Holiday
DirectionalFrom South From West
Weekday
PM
Start Date: Tuesday, August 5, 2025
Total Number of Hours Counted: 6
All Motor Vehicles
Schools Not in Session
No Special Events
From East
Intersection Traffic Volume Report
Totals
AMMD
From North
0
5
10
15
20
25
30
35
40
0
20
40
60
80
100
120
6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM
Entering Vehicle Volume By Approach (Line Chart)
Total Entering Vehicle Volume (Bar Chart)
One-Hour Time Period Start Time
(For example, 6am represents volumes from 6am to 7am)
Graphical Summary of Hourly Volumes
All Motor Vehicles Southbound Approach Westbound Approach
Northbound Approach Eastbound Approach
Page 107 of 251
Count Basics Page 5 of 13
15-Minute Motor Vehicle Data
2nd Street & Alley
15-Minute Motor Vehicle Data
15-Minute
Time Period 2nd Street Alley 2nd Street Alley 15-Min Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum PHF
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 1 24 0.40
6:15 AM 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 1 0 0 0 1 2 38 0.63
6:30 AM 0 7 0 0 7 0 0 0 0 0 0 0 0 0 0 6 1 1 0 8 15 60 0.63
6:45 AM 0 2 0 0 2 0 0 0 0 0 0 3 1 0 4 0 0 0 0 0 6 63 0.66
7:00 AM 1 6 0 0 7 0 0 0 0 0 1 2 2 0 5 2 0 1 0 3 15 83 0.80
7:15 AM 0 13 0 0 13 0 0 0 0 0 2 4 1 1 8 2 1 0 0 3 24 81 0.78
7:30 AM 1 5 0 0 6 0 0 0 0 0 1 5 2 0 8 3 1 0 0 4 18 74 0.71
7:45 AM 0 5 0 0 5 0 0 2 0 2 1 3 6 0 10 9 0 0 0 9 26 64 0.62
8:00 AM 0 7 0 0 7 0 0 0 0 0 0 1 1 0 2 3 1 0 0 4 13 50 0.74
8:15 AM 0 5 0 0 5 0 0 4 0 4 0 2 1 0 3 5 0 0 0 5 17
8:30 AM 0 2 0 0 2 0 0 0 0 0 0 0 3 2 5 1 0 0 0 1 8
8:45 AM 0 3 0 0 3 0 1 1 0 2 0 1 3 2 6 1 0 0 0 1 12
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 2 6 0 0 8 0 0 2 0 2 0 2 1 1 4 5 0 0 0 5 19 77 0.88
3:15 PM 0 8 1 0 9 1 0 1 0 2 0 4 4 0 8 2 0 1 0 3 22 92 0.68
3:30 PM 0 9 0 0 9 0 1 1 0 2 0 4 1 0 5 0 1 0 0 1 17 91 0.67
3:45 PM 0 8 0 0 8 0 1 2 0 3 1 2 1 0 4 3 0 1 0 4 19 99 0.73
4:00 PM 0 17 1 0 18 0 1 0 0 1 1 7 3 0 11 4 0 0 0 4 34 102 0.75
4:15 PM 0 5 0 0 5 0 0 3 0 3 2 3 1 2 8 5 0 0 0 5 21 89 0.89
4:30 PM 0 6 0 0 6 0 0 7 0 7 1 3 4 0 8 4 0 0 0 4 25 92 0.92
4:45 PM 1 6 0 0 7 0 0 1 0 1 0 5 1 1 7 5 0 2 0 7 22 94 0.87
5:00 PM 0 8 0 0 8 0 0 2 0 2 0 4 3 0 7 3 0 1 0 4 21 94 0.87
5:15 PM 1 6 0 0 7 0 0 1 0 1 0 3 2 2 7 9 0 0 0 9 24
5:30 PM 1 6 0 0 7 0 2 5 0 7 0 3 3 0 6 6 1 0 0 7 27
5:45 PM 0 5 0 0 5 0 0 0 0 0 2 6 3 0 11 6 0 0 0 6 22
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7 145 2 0 154 1 6 33 0 40 12 67 47 11 137 86 6 7 0 99 430
Peak Hour All Vehicle Volume Summary
Hourly Total
Time Period 2nd Street Alley 2nd Street Alley Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume PHF
AM 7:15 AM 1 30 0 0 31 0 0 2 0 2 4 13 10 1 28 17 3 0 0 20 81 0.78
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 1 25 0 0 26 0 0 13 0 13 3 15 9 3 30 17 0 3 0 20 89 0.89
From North From East From South From West
From West
Tuesday, August 5, 2025
Total Number of Hours Counted: 6
All Motor Vehicles
AM Peak Period
Weekday Schools Not in Session
Non-Holiday No Special Events
Start Date:
From North From East From South
Intersection Traffic Volume Report
Midday Peak PeriodPM Peak Period
Totals
Page 108 of 251
Count Basics Page 6 of 13
15-Minute Automobile Data
2nd Street & Alley
15-Minute Automobile Data
15-Minute
Time Period 2nd Street Alley 2nd Street Alley 15-Min Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 1 22
6:15 AM 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 1 36
6:30 AM 0 7 0 0 7 0 0 0 0 0 0 0 0 0 0 6 0 1 0 7 14 59
6:45 AM 0 2 0 0 2 0 0 0 0 0 0 3 1 0 4 0 0 0 0 0 6 63
7:00 AM 1 6 0 0 7 0 0 0 0 0 1 2 2 0 5 2 0 1 0 3 15 83
7:15 AM 0 13 0 0 13 0 0 0 0 0 2 4 1 1 8 2 1 0 0 3 24 81
7:30 AM 1 5 0 0 6 0 0 0 0 0 1 5 2 0 8 3 1 0 0 4 18 74
7:45 AM 0 5 0 0 5 0 0 2 0 2 1 3 6 0 10 9 0 0 0 9 26 64
8:00 AM 0 7 0 0 7 0 0 0 0 0 0 1 1 0 2 3 1 0 0 4 13 50
8:15 AM 0 5 0 0 5 0 0 4 0 4 0 2 1 0 3 5 0 0 0 5 17
8:30 AM 0 2 0 0 2 0 0 0 0 0 0 0 3 2 5 1 0 0 0 1 8
8:45 AM 0 3 0 0 3 0 1 1 0 2 0 1 3 2 6 1 0 0 0 1 12
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 2 6 0 0 8 0 0 2 0 2 0 2 1 1 4 5 0 0 0 5 19 74
3:15 PM 0 7 1 0 8 1 0 1 0 2 0 4 4 0 8 2 0 1 0 3 21 88
3:30 PM 0 8 0 0 8 0 1 1 0 2 0 4 0 0 4 0 1 0 0 1 15 88
3:45 PM 0 8 0 0 8 0 1 2 0 3 1 2 1 0 4 3 0 1 0 4 19 98
4:00 PM 0 16 1 0 17 0 1 0 0 1 1 7 3 0 11 4 0 0 0 4 33 101
4:15 PM 0 5 0 0 5 0 0 3 0 3 2 3 1 2 8 5 0 0 0 5 21 89
4:30 PM 0 6 0 0 6 0 0 7 0 7 1 3 4 0 8 4 0 0 0 4 25 92
4:45 PM 1 6 0 0 7 0 0 1 0 1 0 5 1 1 7 5 0 2 0 7 22 94
5:00 PM 0 8 0 0 8 0 0 2 0 2 0 4 3 0 7 3 0 1 0 4 21 94
5:15 PM 1 6 0 0 7 0 0 1 0 1 0 3 2 2 7 9 0 0 0 9 24
5:30 PM 1 6 0 0 7 0 2 5 0 7 0 3 3 0 6 6 1 0 0 7 27
5:45 PM 0 5 0 0 5 0 0 0 0 0 2 6 3 0 11 6 0 0 0 6 22
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7 142 2 0 151 1 6 33 0 40 12 67 46 11 136 85 5 7 0 97 424
Peak Hour Automobile Volume Summary
Hourly Total
Time Period 2nd Street Alley 2nd Street Alley Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume
AM 7:15 AM 1 30 0 0 31 0 0 2 0 2 4 13 10 1 28 17 3 0 0 20 81
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 1 25 0 0 26 0 0 13 0 13 3 15 9 3 30 17 0 3 0 20 89
From North From East From South From West
From South From West
PM Peak Period
Totals
AM Peak PeriodMidday Peak Period
From North From East
Automobiles (Cars, Light Trucks, & Motorcycles)
Intersection Traffic Volume Report Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Weekday Schools Not in Session
Non-Holiday No Special Events
Start Date:
Page 109 of 251
Count Basics Page 7 of 13
15-Minute Single Unit (SU) Truck & Bus Data
2nd Street & Alley
15-Minute Single Unit (SU) Truck & Bus Data
15-Minute
Time Period 2nd Street Alley 2nd Street Alley 15-Min Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
6:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
6:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 1
6:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
3:15 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 4
3:30 PM 0 1 0 0 1 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 2 3
3:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
4:00 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1
4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 300 30 000 00 010 10 100 1 5
SU Truck %age:
0.0% 2.1% 0.0% 0.0% 1.9% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.1% 0.0% 0.7% 0.0 % 16.7% 0.0% 0.0% 1.0% 1.2%
Peak Hour Single Unit (SU) Truck & Buses Volume Summary
Hourly Total
Time Period 2nd Street Alley 2nd Street Alley Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume
AM 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
From North From East From South From West
From South From West
PM Peak Period
Totals
AM Peak PeriodMidday Peak Period
From North From East
Single Unit (SU) Trucks & Buses
Intersection Traffic Volume Report Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Weekday Schools Not in Session
Non-Holiday No Special Events
Start Date:
Page 110 of 251
Count Basics Page 8 of 13
15-Minute Semi-Truck Data
2nd Street & Alley
15-Minute Semi-Truck Data
15-Minute
Time Period 2nd Street Alley 2nd Street Alley 15-Min Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
6:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 1 1
6:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 000 00 000 00 000 01 000 1 1
Semi Truck %age: 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 1.2 % 0.0% 0.0% 0.0% 1.0% 0.2%
Peak Hour Semi-Truck Volume Summary
Hourly Total
Time Period 2nd Street Alley 2nd Street Alley Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume
AM 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
From North From East From South From West
From WestFrom East From South
PM Peak Period
Totals
AM Peak PeriodMidday Peak Period
From North
Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Semi-Trucks
Weekday Schools Not in Session
Non-Holiday No Special Events
Start Date:
Intersection Traffic Volume Report
Page 111 of 251
Count Basics Page 9 of 13
15-Minute Heavy Vehicle Data
2nd Street & Alley
15-Minute Heavy Vehicle Data
15-Minute
Time Period 2nd Street Alley 2nd Street Alley 15-Min Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
6:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 1 2
6:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 1
6:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
3:15 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 4
3:30 PM 0 1 0 0 1 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 2 3
3:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
4:00 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1
4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 300 30 000 00 010 11 100 2 6
Total Truck %age: 0.0% 2.1% 0.0% 0.0% 1.9% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.1% 0.0% 0.7% 1.2 % 16.7% 0.0% 0.0% 2.0% 1.4%
Peak Hour Heavy Vehicle Volume Summary
Hourly Total
Time Period 2nd Street Alley 2nd Street Alley Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume
AM 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
From North From East From South From West
From South From West
PM Peak Period
Totals
AM Peak PeriodMidday Peak Period
From North From East
Heavy Vehicles (Single-Unit Trucks, Buses & Semi-Trucks)
Intersection Traffic Volume Report Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Weekday Schools Not in Session
Non-Holiday No Special Events
Start Date:
Page 112 of 251
Count Basics Page 10 of 13
15-Minute Heavy Vehicle Percentages
2nd Street & Alley
15-Minute Heavy Vehicle Percentages
Total Hourly
15-Minute Heavy Heavy
Time Period 2nd Street Alley 2nd Street Alley Vehicle Vehicle
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Percent Percent
6:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 8.3
6:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 0.0 0.0 0.0 100.0 50.0 5.3
6:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 0.0 0.0 12.5 6.7 1.7
6:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0
7:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0
7:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0
7:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0
7:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0
8:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0
8:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
8:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
8:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
10:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
10:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
10:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
10:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
11:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
11:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
11:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
11:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
12:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
12:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
12:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
12:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
1:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
1:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
1:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
1:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
2:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
2:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
2:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
2:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
3:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 3.9
3:15 PM 0.0 12.5 0.0 0.0 11.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.5 4.3
3:30 PM 0.0 11.1 0.0 0.0 11.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 0.0 20.0 0.0 0.0 0.0 0.0 0.0 11.8 3.3
3:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 1.0
4:00 PM 0.0 5.9 0.0 0.0 5.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 2.9 1.0
4:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0
4:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0
4:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0
5:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0
5:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
5:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
5:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
6:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
6:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
6:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
6:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
7:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
7:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
7:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
7:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
8:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
8:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
8:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
8:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
0.0 2.1 0.0 0.0 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0 0.7 1.2 16.7 0.0 0.0 2.0 1. 4
Semi Truck Percentage: 0.2326
Peak Hour Heavy Vehicle Percentages Summary
Hourly
Hourly Heavy
Time Period 2nd Street Alley 2nd Street Alley Vehicle
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Percent
AM 7:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
MD 12:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
PM 4:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
From North From East From South From West
From South From WestFrom East
Intersection Traffic Volume Report Start Date: Tuesday, August 5, 2025
Total Number of Hours Counted: 6
PM Peak Period
Totals
AM Peak PeriodMidday Peak Period
From North
%
Weekday Schools Not in Session
Non-Holiday
Heavy Vehicles (Single-Unit Trucks, Buses & Semi-Trucks)
No Special Events
Page 113 of 251
Page 11 of 13
15-Minute Pedestrian and Bicyclist Data
2nd Street & Alley
15-Minute Pedestrian and Bicyclist Data
15-Minute
Time Period 2nd Street Alley 2nd Street Alley 15-Min Hourly
Start Time Total Total Total Total Totals Sum
6:00 AM 0000 0 3
6:15 AM 0000 0 5
6:30 AM 0100 1 8
6:45 AM 0002 2 1 0
7:00 AM 0002 2 1 1
7:15 AM 1200 3 1 0
7:30 AM 1002 3 1 2
7:45 AM 1002 3 1 2
8:00 AM 1000 1 1 4
8:15 AM 0104 5
8:30 AM 1011 3
8:45 AM 0311 5
9:00 AM 0000 0
9:15 AM 0000 0
9:30 AM 0000 0
9:45 AM 0000 0
10:00 AM 0000 0
10:15 AM 0000 0
10:30 AM 0000 0
10:45 AM 0000 0
11:00 AM 0000 0
11:15 AM 0000 0
11:30 AM 0000 0
11:45 AM 0000 0
12:00 PM 0000 0
12:15 PM 0000 0
12:30 PM 0000 0
12:45 PM 0000 0
1:00 PM 0000 0
1:15 PM 0000 0
1:30 PM 0000 0
1:45 PM 0000 0
2:00 PM 0000 0
2:15 PM 0000 0
2:30 PM 0000 0
2:45 PM 0000 0
3:00 PM 1103 5 9
3:15 PM 1000 1 7
3:30 PM 0001 1 1 5
3:45 PM 1001 2 1 6
4:00 PM 0111 3 1 9
4:15 PM 2304 9 2 5
4:30 PM 0011 2 2 1
4:45 PM 0104 5 2 6
5:00 PM 2025 9 2 3
5:15 PM 2111 5
5:30 PM 3013 7
5:45 PM 0101 2
6:00 PM 0000 0
6:15 PM
0000 0
6:30 PM 0000 0
6:45 PM 0000 0
7:00 PM 0000 0
7:15 PM 0000 0
7:30 PM 0000 0
7:45 PM 0000 0
8:00 PM 0000 0
8:15 PM 0000 0
8:30 PM 0000 0
8:45 PM 0000 0
9:00 PM 0000 0
9:15 PM 0000 0
9:30 PM 0000 0
9:45 PM 0000 0
17 15 8 39 79
Special Pedestrians
Pedestrian Type
Other (None)
Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Start Date:
Count Basics
Unknown
West Approach
00
Pedestrians and Bicyclists
00 00
10
40
4
00 00 0
0
00
00 00
00 00 00
00
00
00
Crossing
0
00 00
00 0
00 00
00 000
Crossing Crossing
0
00
North Approach East Approach South Approach
00
000
00 00 00
00
00 00 0
00 00 00
PM Peak Period
00 0
0
0
0
00 0
00 10 00
11
00
00
00
1
00 00 00 00
00 00 00
00 0 00
00 00 00
00 00 00 00
0
30 00 01 30
10 10
00 01 15 0
00 01 00
0
00 00 10 10
20 21 00
10
00 10 10 10
10 00 00
00
00 00 00 10
01 00 00
00
10 10 00 30
00 00 00
00
00 00 00 00
00 00 00
00
00 00 00 00
00 00 00
00
00
00 00 00 00
00 00 00
00
00
00 00 00
00 00 00
0
00
00
00 00 00 00
00 00 00
00
00 00 00 00
00 00 00
00
00 00 00 00
00 00 00
00
00 00 00 00
00 00 00
00
00 00 00 00
000 00
0
10 10
0
11
0
00 000
4000 10
00 00 00
0
1
0
10 00
0
00 01
10 20 00 0
20
Crossing
00 0
0
10 0
0
Pedestrian Bicyclist Pedestrian
00
0
1
0
0
00
Bicyclist
0
0
0
0
AM Peak Period
0
Midday Peak Period
0
0
0
0
0
0
0
0
00
00 0
0
0
00
3
0
1
Pedestrian Bicyclist
00
00
00
0
0
00
00
0
200
3
0
00
0
00
0
00 00
0
00 00
0
0
00 00
0
Elderly/Disabled (except wheelchai
Wheelchairs/Electric Scooters
x
x
x
x
x
x
1 or 2 A Few Several Many
Weekday Schools Not in Session
Non-Holiday No Special Events
Totals 15 2 13
None
Pre-school Children
Elementry School Age Children
Visually Impaired (white cane/help
e
38 1
Pedestrian Bicyclist
00
5
0
2
0
1
00
00
2
20
Intersection Traffic Volume Report
Page 114 of 251
Page 12 of 13
15-Minute Adult & Children Count (Manual Entry)
2nd Street & Alley
15-Minute Adult & Children Pedestrian Data
15-Minute
Time Period 2nd Street Alley 2nd Street Alley 15-Min Hourly
Start Time Total Total Total Total Totals Sum
12:00 AM 0000 0 0
12:15 AM 0000 0 0
12:30 AM 0000 0 0
12:45 AM 0000 0 0
1:00 AM 0000 0 0
1:15 AM 0000 0 0
1:30 AM 0000 0 0
1:45 AM 0000 0 0
2:00 AM 0000 0 0
2:15 AM 0000 0 0
2:30 AM 0000 0 0
2:45 AM 0000 0 0
3:00 AM 0000 0 0
3:15 AM 0000 0 0
3:30 AM 0000 0 0
3:45 AM 0000 0 0
4:00 AM 0000 0 0
4:15 AM 0000 0 0
4:30 AM 0000 0 0
4:45 AM 0000 0 0
5:00 AM 0000 0 0
5:15 AM 0000 0 0
5:30 AM 0000 0 0
5:45 AM 0000 0 1
6:00 AM 0000 0 3
6:15 AM 0000 0 5
6:30 AM 0100 1 8
6:45 AM 0002 2 1 0
7:00 AM 0002 2 1 0
7:15 AM 1200 3 9
7:30 AM 1002 3 1 1
7:45 AM 1001 2 1 0
8:00 AM 1000 1 1 3
8:15 AM 0104 5 1 2
8:30 AM 1001 2 7
8:45 AM 0311 5 5
9:00 AM 0000 0 0
9:15 AM 0000 0 0
9:30 AM 0000 0 0
9:45 AM 0000 0 0
10:00 AM 0000 0 0
10:15 AM 0000 0 0
10:30 AM 0000 0 0
10:45 AM 0000 0 0
11:00 AM 0000 0 0
11:15 AM 0000 0 0
11:30 AM 0000 0 0
11:45 AM 0000 0 0
12:00 PM 0000 0 0
12:15 PM
0000 0 0
12:30 PM 0000 0 0
12:45 PM 0000 0 0
1:00 PM 0000 0 0
1:15 PM 0000 0 0
1:30 PM 0000 0 0
1:45 PM 0000 0 0
2:00 PM 0000 0 0
2:15 PM 0000 0 5
2:30 PM 0000 0 5
2:45 PM 0000 0 6
3:00 PM 1103 5 8
3:15 PM 0000 0 6
3:30 PM 0001 1 1 4
3:45 PM 1001 2 1 5
4:00 PM 0111 3 1 7
4:15 PM 2204 8 2 2
4:30 PM 0011 2 1 8
4:45 PM 0004 4 2 2
5:00 PM 2015 8 2 0
5:15 PM 1111 4 1 2
5:30 PM 3003 6 8
5:45 PM 0101 2 2
6:00 PM 0000 0 0
6:15 PM 0000 0 0
6:30 PM 0000 0 0
6:45 PM 0000 0 0
7:00 PM 0000 0 0
7:15 PM 0000 0 0
7:30 PM 0000 0 0
7:45 PM 0000 0 0
8:00 PM 0000 0 0
8:15 PM 0000 0 0
8:30 PM 0000 0 0
8:45 PM 0000 0 0
9:00 PM 0000 0 0
9:15 PM 0000 0 0
9:30 PM 0000 0 0
9:45 PM 0000 0 0
10:00 PM 0000 0 0
10:15 PM 0000 0 0
10:30 PM 0000 0 0
10:45 PM 0000 0 0
11:00 PM 0000 0 0
11:15 PM 0000 0
11:30 PM 0000 0
11:45 PM 0000 0
15 13 5 38 71
Count Basics
Start Date: Tuesday, August 5, 2025 Weekday Schools Not in Session
Total Number of Hours Counted: 6 Non-Holiday No Special Events
Adults Children Adults Children Adults Children Adults Children
Adults & Children
Crossing Crossing Crossing Crossing
North Approach East Approach South Approach West Approach
0
000
0
0
00
0
02
010
2
1200
000
2
1001
100
0
0104
100
1
0311
100
0
0000
000
0
Midday Peak Period
0
0000
000
0
0
0
0000
000
0
0000
000
0
0000
000
0
0000
000
0
0000
000
PM Peak Period
000
00
000
000
0
0000
0
00
1103
0
1
1001
000
1
2204
011
1
0004
001
5
1111
201
3
0101
300
0
0000
000
0
0000
000
0
0000
000
0
0000
000
0
0000
000
0
0000
000
0
0000
000
0
0000
000
03 8 0Totals 15 0 13 0 5
0
0
0
00
00
0
0
0
0
0
0
0
0
0
0
00
AM Peak Period Pre-AM Peak Period
0000
0000
0000
0
000
0000
0000
000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0
0
0
0
0
0
0000
0000
0000
0000
Intersection Traffic Volume Report
0000
0000
Post PM Peak Period
000
Page 115 of 251
Count Basics Page 13 of 1 3
15-Minute Bicycle Turning Movement Count (Manual Entry)
2nd Street & Alley
15-Minute Bicycle Data
15-Minute
Time Period 2nd Street Alley 2nd Street Alley 15-Min Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum
12:00 AM 0000 0 0
12:15 AM 0000 0 0
12:30 AM 0000 0 0
12:45 AM 0000 0 0
1:00 AM 0000 0 0
1:15 AM 0000 0 0
1:30 AM 0000 0 0
1:45 AM 0000 0 0
2:00 AM 0000 0 0
2:15 AM 0000 0 0
2:30 AM 0000 0 0
2:45 AM 0000 0 0
3:00 AM 0000 0 0
3:15 AM 0000 0 0
3:30 AM 0000 0 0
3:45 AM 0000 0 0
4:00 AM 0000 0 0
4:15 AM 0000 0 0
4:30 AM 0000 0 0
4:45 AM 0000 0 0
5:00 AM 0000 0 0
5:15 AM 0000 0 0
5:30 AM 0000 0 0
5:45 AM 0000 0 0
6:00 AM 0000 0 0
6:15 AM 0000 0 0
6:30 AM 0000 0 0
6:45 AM 0000 0 0
7:00 AM 0000 0 0
7:15 AM 0000 0 0
7:30 AM 0000 0 0
7:45 AM 0000 0 0
8:00 AM 0000 0 0
8:15 AM 0000 0 0
8:30 AM 0000 0 0
8:45 AM 0000 0 0
9:00 AM 0000 0 0
9:15 AM 0000 0 0
9:30 AM 0000 0 0
9:45 AM 0000 0 0
10:00 AM 0000 0 0
10:15 AM 0000 0 0
10:30 AM 0000 0 0
10:45 AM 0000 0 0
11:00 AM 0000 0 0
11:15 AM 0000 0 0
11:30 AM 0000 0 0
11:45 AM 0000 0 0
12:00 PM 0000 0 0
12:15 PM 0000 0 0
12:30 PM 0000 0 0
12:45 PM 0000 0 0
1:00 PM 0000 0 0
1:15 PM 0000 0 0
1:30 PM 0000 0 0
1:45 PM 0000 0 0
2:00 PM 0000 0 0
2:15 PM 0000 0 0
2:30 PM 0000 0 0
2:45 PM 0000 0 0
3:00 PM 0000 0 0
3:15 PM 0000 0 0
3:30 PM 0000 0 0
3:45 PM 0000 0 0
4:00 PM 0000 0 0
4:15 PM 0000 0 0
4:30 PM 0000 0 0
4:45 PM 0000 0 0
5:00 PM 0000 0 0
5:15 PM 0000 0 0
5:30 PM 0000 0 0
5:45 PM 0000 0 0
6:00 PM 0000 0 0
6:15 PM 0000 0 0
6:30 PM 0000 0 0
6:45 PM 0000 0 0
7:00 PM 0000 0 0
7:15 PM 0000 0 0
7:30 PM 0000 0 0
7:45 PM 0000 0 0
8:00 PM 0000 0 0
8:15 PM 0000 0 0
8:30 PM 0000 0 0
8:45 PM 0000 0 0
9:00 PM 0000 0 0
9:15 PM 0000 0 0
9:30 PM 0000 0 0
9:45 PM 0000 0 0
10:00 PM 0000 0 0
10:15 PM 0000 0 0
10:30 PM 0000 0 0
10:45 PM 0000 0 0
11:00 PM 0000 0 0
11:15 PM 0000 0
11:30 PM 0000 0
11:45 PM 0000 0
0 000 00 000 00 000 00 000 0 0
Peak Hour Bicycle Turning Movement Volume Summary
Hourly Total
Time Period 2nd Street Alley 2nd Street Alley Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume
AM 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
From North From East From South From West
Post PM Peak Period AM Peak PeriodPM Peak Period
Totals
Schools Not in Session
Total Number of Hours Counted: 6 Non-Holiday No Special Events
Midday Peak Period
Bicyclists
From North
Pre-AM Peak Period
Start Date: Tuesday, August 5, 2025 Weekday
From East From South From West
Intersection Traffic Volume Report
Page 116 of 251
Count Basics Special Report
15-Minute Motor Vehicle Data (Daily & Seasonally Adjusted)
2nd Street & Alley
15-Minute Motor Vehicle Data
15-Minute
Time Period 2nd Street Alley 2nd Street Alley 15-Min Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum PHF
12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 1 22 0.42
6:15 AM 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 1 0 0 0 1 2 35 0.63
6:30 AM 0 6 0 0 6 0 0 0 0 0 0 0 0 0 0 5 1 1 0 7 13 55 0.63
6:45 AM 0 2 0 0 2 0 0 0 0 0 0 3 1 0 4 0 0 0 0 0 6 58 0.66
7:00 AM 1 5 0 0 6 0 0 0 0 0 1 2 2 0 5 2 0 1 0 3 14 75 0.82
7:15 AM 0 11 0 0 11 0 0 0 0 0 2 4 1 1 8 2 1 0 0 3 22 73 0.79
7:30 AM 1 4 0 0 5 0 0 0 0 0 1 4 2 0 7 3 1 0 0 4 16 66 0.72
7:45 AM 0 4 0 0 4 0 0 2 0 2 1 3 5 0 9 8 0 0 0 8 23 58 0.63
8:00 AM 0 6 0 0 6 0 0 0 0 0 0 1 1 0 2 3 1 0 0 4 12 47 0.78
8:15 AM 0 4 0 0 4 0 0 4 0 4 0 2 1 0 3 4 0 0 0 4 15
8:30 AM 0 2 0 0 2 0 0 0 0 0 0 0 3 2 5 1 0 0 0 1 8
8:45 AM 0 3 0 0 3 0 1 1 0 2 0 1 3 2 6 1 0 0 0 1 12
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 2 5 0 0 7 0 0 2 0 2 0 2 1 1 4 4 0 0 0 4 17 72 0.86
3:15 PM 0 7 1 0 8 1 0 1 0 2 0 4 4 0 8 2 0 1 0 3 21 86 0.69
3:30 PM 0 8 0 0 8 0 1 1 0 2 0 4 1 0 5 0 1 0 0 1 16 84 0.68
3:45 PM 0 7 0 0 7 0 1 2 0 3 1 2 1 0 4 3 0 1 0 4 18 91 0.73
4:00 PM 0 15 1 0 16 0 1 0 0 1 1 6 3 0 10 4 0 0 0 4 31 92 0.74
4:15 PM 0 4 0 0 4 0 0 3 0 3 2 3 1 2 8 4 0 0 0 4 19 81 0.88
4:30 PM 0 5 0 0 5 0 0 6 0 6 1 3 4 0 8 4 0 0 0 4 23 84 0.91
4:45 PM 1 5 0 0 6 0 0 1 0 1 0 4 1 1 6 4 0 2 0 6 19 85 0.89
5:00 PM 0 7 0 0 7 0 0 2 0 2 0 4 3 0 7 3 0 1 0 4 20 85 0.89
5:15 PM 1 5 0 0 6 0 0 1 0 1 0 3 2 2 7 8 0 0 0 8 22
5:30 PM 1 5 0 0 6 0 2 4 0 6 0 3 3 0 6 5 1 0 0 6 24
5:45 PM 0 4 0 0 4 0 0 0 0 0 2 5 3 0 10 5 0 0 0 5 19
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7 124 2 0 133 1 6 31 0 38 12 63 46 11 132 77 6 7 0 90 393
Peak Hour All Vehicle Volume Summary
Hourly Total
Time Period 2nd Street Alley 2nd Street Alley Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume PHF
AM 7:15 AM 1 25 0 0 26 0 0 2 0 2 4 12 9 1 26 16 3 0 0 19 73 0.79
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 1 21 0 0 22 0 0 12 0 12 3 14 9 3 29 15 0 3 0 18 81 0.88
From South From West
Schools Not in Session
Total Number of Hours Counted: 6 Non-Holiday No Special Events
Start Date: Tuesday, August 5, 2025 WeekdayIntersection Traffic Volume Report
All Motor Vehicles
From North From East From South From West
From East
PM Peak Period
Totals
Post PM Peak Period Midday Peak Period
From North
AM Peak Period Pre-AM Peak Period
Page 117 of 251
Version 2025.03 Page 1 of 13
Base Information, Observed (6) Hour and Estimated (24) Hour Volume Summaries
Major St: Main Street
Minor St: 2nd Street
Main Street & 2nd Street
Site Information Count Information
SW-M
↑
AM MD PM
AM MD PM
0.877 2.359
Company Name 1.000
Comments
Observed 6 Hour Volume Summary
6
PED: 59 BIKE: 9
64 31 180 0
PED: 83 PED:
59 2039 48
208
0
↑
0 North
35
BIKE: 2053 BIKE:
19 94 6
0 108 23 267
PED: 70 BIKE: 6
Estimated 24 Hour AADT
132 64 373 0
172
4220
431
0
↑
0 North
72
4249
195
Daily/Seasonal Factor 0.877 0 224 48 553
Count Expansion Factor 2.359
Manual Adjustment Factor 1.000
Total 24 Hr Expansion Factor 2.070
7:15-8:15am
North Leg 2nd Street
Clear and Dry
Clear and Dry
AM Peak Period
Weather
Wednesday, August 6, 2025
Wednesday, August 6, 2025
Midday Peak Period
PM Peak Period Tuesday, August 5, 2025
Peak Hours Selected for Analysis
Calculated Peak Hours
Clear and Dry
West Leg Main Street
South Leg 2nd Street 7:15-8:15am
Traffic Control Traffic Signal
AM Peak Period
Midday Peak Period
PM Peak Period
Amy Scheuerlein
Amy Scheuerlein
Observers
Special Pedestrians Observed
None
None
Manual Adj.
Elementry school age children
Pre-school children
TADI
None
2211
Other (describe) None None
TOTAL ENTERING VOLUME
None
Wis DOT Daily & Seasonal Factors are final for 2012 through 2024,
and 2025 uses 2024 final factors.
None
NoneWheelchairs/electric scooters
Elderly/disabled (except wheelchairs)
Visually impaired (white cane/helper dog)
2500
141
2330
Main Street
333
398
731
569
2nd Street
689
824
1,513
292
4823
4576
Roadway Names North Direction
4:15-5:15pm
4:15-5:15pm
9,997
Main Street
5175
10,732
TOTAL ENTERING VOLUME
5,185
275
4,830
Main Street
9,093
2nd Street
ESTIMATED 2nd Street
Total Entering Hourly Volume
Main Street
4,393
2182
Count Basics
Schools Not in Session
1st Day of Count Tuesday, August 5, 2025
No Special Events
Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Start Date:
County
Intersection of:
WisDOT Region13 - Dane
Weekday
Non-Holiday
Municipality Village of Mt Horeb Hrs Counted: 06:00 AM-09:00 AM and 03:00 PM-06:00 PM
Intersection Traffic Volume Report
Special Considerations
East Leg Main Street
Holidays None
Special Events None
(1) Non-Interstate Low Truck %Count Expansion Group
Daily/Seasonal Adjustment Factor
Schools Not in Session
Count Expansion Factor
(1) Non-Interstate Low Truck %Daily/Seasonal Adjustment Group
24 HOUR AADT 861
HOUR VOLUMES 416
OBSERVED 2nd Street
4516
456
802 774
000000
894
1158 1101
0
0
1,000
2,000
6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM
Motor Vehicle
Volume
One-Hour Time Period Start Time (Ex: 6am represents volume from 6am to 7am)
Page 118 of 251
Page 2 of 13
Peak Hour Volume Graphical Summary
Main Street & 2nd Street
AM Peak Hour Summary
PED: 0 BIKE: 2
9 2 41 0 Manual Adj. 1.000
PED: 14 PED:
3 222 2
30
0
↑
0 North
9
BIKE: 402 BIKE:
12 0 1
01 8 6 6 5
PED: 9 BIKE: 1
Midday (MD) Peak Hour Summary
PED: 0 BIKE: 0
0 0 0 0 Manual Adj. 1.000
PED: 0 PED:
0 00
0
0
↑
0 North
0
BIKE: 0 BIKE:
00 0
00 0 0
PED: 0 BIKE: 0
PM Peak Hour Summary
PED: 5 BIKE: 0
18 7 36 0 Manual Adj. 1.000
PED: 22 PED:
12 571 4
48
0
↑
0 North
2
BIKE: 373 BIKE:
81 1 1
02 9 7 4 7
PED: 6 BIKE: 1
Count Basics
Start Date: Tuesday, August 5, 2025
Total Number of Hours Counted: 6
2nd Street
66
83
149
0
0
0
0
1,097
386 456
Weekday
Non-Holiday
All Motor Vehicles
641
Main Street
61
31
TOTAL ENTERING VOLUME
1,171
2nd Street
0
Main Street
0
0
508
TOTAL ENTERING VOLUME
Main Street
618
PM PEAK HOUR 2nd Street
4:15-5:15pm 92
1,004
Main Street
0
0
0
0 0
0
MD PEAK HOUR
141
2nd Street
2nd Street
52
89
Intersection Traffic Volume Report
Wednesday, August 6, 2025
N/A
Tuesday, August 5, 2025
Schools Not in Session
No Special Events
AM PEAK HOUR 2nd Street TOTAL ENTERING VOLUME
7:15-8:15am 81 838
52
29
249
Main Street
266
Main Street
680
774
431
Page 119 of 251
Count Basics Page 3 of 13
Peak Hour Volume Summary
Main Street & 2nd Street
Peak Hour Volumes, Truck Percentages, and PHFs
AM Peak Hour 2nd Street Main Street 2nd Street Main Street
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals
7:15 AM 4 0 12 0 16 3 43 4 0 50 13 2 7 0 22 1 105 3 0 109 197
7:30 AM 1 0 8 0 9 4 58 7 0 69 17 1 3 0 21 7 101 3 0 111 210
7:45 AM 0 2 14 0 16 6 67 11 0 84 21 2 6 0 29 5 95 3 0 103 232
8:00 AM 4 0 7 0 11 1 54 8 0 63 14 1 2 0 17 7 101 0 0 108 199
Peak Hour Volume 9 2 41 0 52 14 222 30 0 266 65 6 18 0 89 20 402 9 0 431 838
Rounded Hourly Volume 10 0 40 0 50 15 220 30 0 265 65 5 20 0 90 20 400 10 0 430 835
% Single Unit Trucks 11.1 0.0 0.0 0.0 1.9 0.0 8.1 0.0 0.0 6.8 0.0 16.7 5.6 0. 0 2.2 0.0 8.5 0.0 0.0 7.9 6.6
% Heavy Trucks 0.0 0.0 0.0 0.0 0.0 0.0 1.8 6.7 0.0 2.3 0.0 0.0 0.0 0.0 0.0 5.0 0 .2 0.0 0.0 0.5 1.0
% Trucks (Total) 11.1 0.0 0.0 0.0 1.9 0.0 9.9 6.7 0.0 9.0 0.0 16.7 5.6 0.0 2.2 5.0 8.7 0.0 0.0 8.4 7.5
Peak Hour Factor (PHF) 0.56 0.25 0.73 0.00 0.81 0.58 0.83 0.68 0.00 0.79 0 .77 0.75 0.64 0.00 0.77 0.71 0.96 0.75 0.00 0.97 0.90
MD Peak Hour 2nd Street Main Street 2nd Street Main Street
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Peak Hour Volume 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Rounded Hourly Volume 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
% Single Unit Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0 0.0 0.0
% Heavy Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0
% Trucks (Total) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0 0.0 0.0
Peak Hour Factor (PHF) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 .00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PM Peak Hour 2nd Street Main Street 2nd Street Main Street
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals
4:15 PM 4 3 7 0 14 7 143 9 0 159 14 1 5 0 20 2 92 0 0 94 287
4:30 PM 7 2 10 0 19 8 144 16 0 168 13 1 10 0 24 6 110 1 0 117 328
4:45 PM 4 1 8 0 13 2 125 15 0 142 10 4 9 0 23 3 78 0 0 81 259
5:00 PM 3 1 11 0 15 5 159 8 0 172 10 1 5 0 16 0 93 1 0 94 297
Peak Hour Volume 18 7 36 0 61 22 571 48 0 641 47 7 29 0 83 11 373 2 0 386 1171
Rounded Hourly Volume 20 5 35 0 60 20 570 50 0 640 45 5 30 0 80 10 375 0 0 385 1165
% Single Unit Trucks 0.0 0.0 0.0 0.0 0.0 4.5 4.4 0.0 0.0 4.1 0.0 0.0 3.4 0.0 1 .2 0.0 3.2 50.0 0.0 3.4 3.4
% Heavy Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0 .5 0.0 0.0 0.5 0.4
% Trucks (Total) 0.0 0.0 0.0 0.0 0.0 4.5 4.9 0.0 0.0 4.5 0.0 0.0 3.4 0.0 1.2 0. 0 3.8 50.0 0.0 3.9 3.8
Peak Hour Factor (PHF) 0.64 0.58 0.82 0.00 0.80 0.69 0.90 0.75 0.00 0.93 0 .84 0.44 0.72 0.00 0.86 0.46 0.85 0.50 0.00 0.82 0.89
Peak Hour Pedestrian and Bicyclist Volumes
Pedestrians and Bicyclists Total
Ped &
2nd Street Main Street 2nd Street Main Street Bike
15-Minute Start Time Total Total Total Total Volume
7:15 AM 0140 5
7:30 AM 0221 5
7:45 AM 2001 3
8:00 AM 0042 6
Total 2 3 10 4 19
12:00 PM 0000 0
12:15 PM 0000 0
12:30 PM 0000 0
12:45 PM 0000 0
Total 0000 0
4:15 PM 2106 9
4:30 PM 0225 9
4:45 PM 3006 9
5:00 PM 0253 1 0
Total 5 5 7 20 37
All Motor Vehicles
From West
From South From West
Weekday
West Approach
From South
From South From West
Non-Holiday
Schools Not in Session
No Special Events
Start Date: Tuesday, August 5, 2025
Total Number of Hours Counted: 6
AM
2
0
2
0
0
0
Bicyclist Pedestrian
Crossing
From North From East
From North From East
From East
Bicyclist
Wednesday, August 6, 2025
N/A
0
0
0
Pedestrian
0
0
Bicyclist
40
Pedestrian Bicyclist
CrossingCrossing
South Approach
Pedestrian
AM Peak HourMidday (MD) Peak Hour
From North
Tuesday, August 5, 2025
Crossing
North Approach
PM Peak Hour
East Approach
91
0
00
10
11
21
0
00 0000 0
00
01
10
20
31
40
11
00
00 0000 00
MD
00 00 00 00
00 00 00 0
0
00 0000 00
02
PM
20 1
30 0
50 4
00 2
00 1
Intersection Traffic Volume Report
1
000
816 1 1 2
41 21
3
4
20 50
3
0
00
Page 120 of 251
Count Basics Page 4 of 13
Hourly Volume Summary - Motor Vehicle Data
Main Street & 2nd Street
One-Hour Motor Vehicle Data
One-Hour Total
Time Period 2nd Street Main Street 2nd Street Main Street Vehicle
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume E/W N/S
6:00 AM 6 1 12 0 19 2 126 10 0 138 26 0 6 0 32 6 258 3 0 267 456 405 51
7:00 AM 6 3 39 0 48 14 211 26 0 251 64 5 19 0 88 13 388 14 0 415 802 666 136
8:00 AM 7 2 26 0 35 11 245 38 0 294 49 4 11 0 64 18 361 2 0 381 774 675 99
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 10 8 30 0 48 15 394 31 0 440 39 2 22 0 63 20 318 5 0 343 894 783 111
4:00 PM 21 9 37 0 67 23 545 49 0 617 52 8 35 0 95 15 361 3 0 379 1158 996 162
5:00 PM 14 8 36 0 58 18 518 54 0 590 37 4 15 0 56 22 367 8 0 397 1101 987 114
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
64 31 180 0 275 83 2039 208 0 2330 267 23 108 0 398 94 2053 35 0 2182 5185 4512 673
Volume Totals
Non-Holiday
DirectionalFrom South From West
Weekday
PM
Start Date: Tuesday, August 5, 2025
Total Number of Hours Counted: 6
All Motor Vehicles
Schools Not in Session
No Special Events
From East
Intersection Traffic Volume Report
Totals
AMMD
From North
0
100
200
300
400
500
600
700
0
200
400
600
800
1000
1200
1400
6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM
Entering Vehicle Volume By Approach (Line Chart)
Total Entering Vehicle Volume (Bar Chart)
One-Hour Time Period Start Time
(For example, 6am represents volumes from 6am to 7am)
Graphical Summary of Hourly Volumes
All Motor Vehicles Southbound Approach Westbound Approach
Northbound Approach Eastbound Approach
Page 121 of 251
Count Basics Page 5 of 13
15-Minute Motor Vehicle Data
Main Street & 2nd Street
15-Minute Motor Vehicle Data
15-Minute
Time Period 2nd Street Main Street 2nd Street Main Street 15-Min Hour ly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum PHF
6:00 AM 0 0 1 0 1 0 20 1 0 21 5 0 1 0 6 1 41 0 0 42 70 456 0.78
6:15 AM 0 1 2 0 3 0 39 3 0 42 5 0 1 0 6 0 56 1 0 57 108 549 0.84
6:30 AM 5 0 6 0 11 0 30 3 0 33 5 0 3 0 8 1 79 0 0 80 132 638 0.81
6:45 AM 1 0 3 0 4 2 37 3 0 42 11 0 1 0 12 4 82 2 0 88 146 716 0.85
7:00 AM 1 1 5 0 7 1 43 4 0 48 13 0 3 0 16 0 87 5 0 92 163 802 0.86
7:15 AM 4 0 12 0 16 3 43 4 0 50 13 2 7 0 22 1 105 3 0 109 197 838 0.90
7:30 AM 1 0 8 0 9 4 58 7 0 69 17 1 3 0 21 7 101 3 0 111 210 832 0.90
7:45 AM 0 2 14 0 16 6 67 11 0 84 21 2 6 0 29 5 95 3 0 103 232 811 0.87
8:00 AM 4 0 7 0 11 1 54 8 0 63 14 1 2 0 17 7 101 0 0 108 199 774 0.97
8:15 AM 2 0 12 0 14 1 56 11 0 68 15 1 1 0 17 5 86 1 0 92 191
8:30 AM 1 0 3 0 4 4 74 12 0 90 10 1 2 0 13 5 77 0 0 82 189
8:45 AM 0 2 4 0 6 5 61 7 0 73 10 1 6 0 17 1 97 1 0 99 195
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 3 4 7 0 14 4 94 5 0 103 9 0 6 0 15 6 70 1 0 77 209 894 0.93
3:15 PM 2 2 7 0 11 6 101 5 0 112 10 1 5 0 16 6 84 1 0 91 230 969 0.85
3:30 PM 3 0 6 0 9 2 84 8 0 94 10 1 5 0 16 5 89 2 0 96 215 1026 0.89
3:45 PM 2 2 10 0 14 3 115 13 0 131 10 0 6 0 16 3 75 1 0 79 240 1139 0.87
4:00 PM 6 3 12 0 21 6 133 9 0 148 15 2 11 0 28 4 81 2 0 87 284 1158 0.88
4:15 PM 4 3 7 0 14 7 143 9 0 159 14 1 5 0 20 2 92 0 0 94 287 1171 0.89
4:30 PM 7 2 10 0 19 8 144 16 0 168 13 1 10 0 24 6 110 1 0 117 328 1164 0.89
4:45 PM 4 1 8 0 13 2 125 15 0 142 10 4 9 0 23 3 78 0 0 81 259 1118 0.94
5:00 PM 3 1 11 0 15 5 159 8 0 172 10 1 5 0 16 0 93 1 0 94 297 1101 0.93
5:15 PM 3 1 9 0 13 4 114 10 0 128 11 0 2 0 13 6 118 2 0 126 280
5:30 PM 7 3 9 0 19 3 134 19 0 156 7 2 3 0 12 11 83 1 0 95 282
5:45 PM 1 3 7 0 11 6 111 17 0 134 9 1 5 0 15 5 73 4 0 82 242
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
64 31 180 0 275 83 2039 208 0 2330 267 23 108 0 398 94 2053 35 0 2182 5185
Peak Hour All Vehicle Volume Summary
Hourly Total
Time Period 2nd Street Main Street 2nd Street Main Street Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume PHF
AM 7:15 AM 9 2 41 0 52 14 222 30 0 266 65 6 18 0 89 20 402 9 0 431 838 0.90
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 18 7 36 0 61 22 571 48 0 641 47 7 29 0 83 11 373 2 0 386 1171 0.89
From North From East From South From West
From West
Tuesday, August 5, 2025
Total Number of Hours Counted: 6
All Motor Vehicles
AM Peak Period
Weekday Schools Not in Session
Non-Holiday No Special Events
Start Date:
From North From East From South
Intersection Traffic Volume Report
Midday Peak PeriodPM Peak Period
Totals
Page 122 of 251
Count Basics Page 6 of 13
15-Minute Automobile Data
Main Street & 2nd Street
15-Minute Automobile Data
15-Minute
Time Period 2nd Street Main Street 2nd Street Main Street 15-Min Hour ly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum
6:00 AM 0 0 1 0 1 0 19 1 0 20 5 0 1 0 6 1 40 0 0 41 68 432
6:15 AM 0 0 2 0 2 0 38 3 0 41 5 0 1 0 6 0 50 1 0 51 100 519
6:30 AM 5 0 6 0 11 0 27 3 0 30 5 0 2 0 7 1 71 0 0 72 120 596
6:45 AM 1 0 3 0 4 2 36 3 0 41 11 0 1 0 12 4 81 2 0 87 144 672
7:00 AM 1 1 5 0 7 1 40 4 0 45 13 0 3 0 16 0 82 5 0 87 155 746
7:15 AM 4 0 12 0 16 3 42 3 0 48 13 1 6 0 20 1 89 3 0 93 177 775
7:30 AM 1 0 8 0 9 4 49 7 0 60 17 1 3 0 21 6 97 3 0 106 196 779
7:45 AM 0 2 14 0 16 6 59 11 0 76 21 2 6 0 29 5 89 3 0 97 218 766
8:00 AM 3 0 7 0 10 1 50 7 0 58 14 1 2 0 17 7 92 0 0 99 184 733
8:15 AM 2 0 12 0 14 1 50 11 0 62 15 1 1 0 17 5 82 1 0 88 181
8:30 AM 1 0 3 0 4 4 69 12 0 85 10 1 2 0 13 5 76 0 0 81 183
8:45 AM 0 2 4 0 6 5 58 7 0 70 9 1 6 0 16 1 91 1 0 93 185
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 3 4 7 0 14 4 89 5 0 98 9 0 6 0 15 5 68 1 0 74 201 855
3:15 PM 2 2 6 0 10 6 98 5 0 109 10 1 5 0 16 6 80 1 0 87 222 919
3:30 PM 3 0 5 0 8 1 79 8 0 88 10 1 5 0 16 5 89 2 0 96 208 974
3:45 PM 2 2 10 0 14 3 105 11 0 119 9 0 6 0 15 3 72 1 0 76 224 1078
4:00 PM 5 3 12 0 20 6 119 9 0 134 15 2 11 0 28 4 77 2 0 83 265 1104
4:15 PM 4 3 7 0 14 6 136 9 0 151 14 1 5 0 20 2 90 0 0 92 277 1126
4:30 PM 7 2 10 0 19 8 134 16 0 158 13 1 10 0 24 6 104 1 0 111 312 1125
4:45 PM 4 1 8 0 13 2 119 15 0 136 10 4 9 0 23 3 75 0 0 78 250 1091
5:00 PM 3 1 11 0 15 5 154 8 0 167 10 1 4 0 15 0 90 0 0 90 287 1078
5:15 PM 3 1 9 0 13 4 112 10 0 126 11 0 2 0 13 6 116 2 0 124 276
5:30 PM 7 3 9 0 19 3 131 19 0 153 7 2 3 0 12 11 82 1 0 94 278
5:45 PM 1 3 7 0 11 6 109 17 0 132 9 1 5 0 15 5 70 4 0 79 237
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
62 30 178 0 270 81 1922 204 0 2207 265 22 105 0 392 92 1953 34 0 2079 4948
Peak Hour Automobile Volume Summary
Hourly Total
Time Period 2nd Street Main Street 2nd Street Main Street Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume
AM 7:15 AM 8 2 41 0 51 14 200 28 0 242 65 5 17 0 87 19 367 9 0 395 775
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 18 7 36 0 61 21 543 48 0 612 47 7 28 0 82 11 359 1 0 371 1126
From North From East From South From West
From South From West
PM Peak Period
Totals
AM Peak PeriodMidday Peak Period
From North From East
Automobiles (Cars, Light Trucks, & Motorcycles)
Intersection Traffic Volume Report Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Weekday Schools Not in Session
Non-Holiday No Special Events
Start Date:
Page 123 of 251
Count Basics Page 7 of 13
15-Minute Single Unit (SU) Truck & Bus Data
Main Street & 2nd Street
15-Minute Single Unit (SU) Truck & Bus Data
15-Minute
Time Period 2nd Street Main Street 2nd Street Main Street 15-Min Hour ly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 19
6:15 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 4 0 0 4 5 22
6:30 AM 0 0 0 0 0 0 3 0 0 3 0 0 1 0 1 0 8 0 0 8 12 35
6:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 36
7:00 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 3 0 0 3 4 47
7:15 AM 0 0 0 0 0 0 1 0 0 1 0 1 1 0 2 0 15 0 0 15 18 55
7:30 AM 0 0 0 0 0 0 9 0 0 9 0 0 0 0 0 0 4 0 0 4 13 45
7:45 AM 0 0 0 0 0 0 6 0 0 6 0 0 0 0 0 0 6 0 0 6 12 37
8:00 AM 1 0 0 0 1 0 2 0 0 2 0 0 0 0 0 0 9 0 0 9 12 34
8:15 AM 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 4 0 0 4 8
8:30 AM 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 1 0 0 1 5
8:45 AM 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 6 0 0 6 9
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 1 2 0 0 3 7 34
3:15 PM 0 0 1 0 1 0 3 0 0 3 0 0 0 0 0 0 3 0 0 3 7 44
3:30 PM 0 0 1 0 1 1 4 0 0 5 0 0 0 0 0 0 0 0 0 0 6 47
3:45 PM 0 0 0 0 0 0 8 2 0 10 1 0 0 0 1 0 3 0 0 3 14 55
4:00 PM 1 0 0 0 1 0 13 0 0 13 0 0 0 0 0 0 3 0 0 3 17 48
4:15 PM 0 0 0 0 0 1 7 0 0 8 0 0 0 0 0 0 2 0 0 2 10 40
4:30 PM 0 0 0 0 0 0 8 0 0 8 0 0 0 0 0 0 6 0 0 6 14 32
4:45 PM 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 0 2 0 0 2 7 22
5:00 PM 0 0 0 0 0 0 5 0 0 5 0 0 1 0 1 0 2 1 0 3 9 19
5:15 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2
5:30 PM 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 1 0 0 1 4
5:45 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 2 0 0 2 4
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2 020 42 9 7201 0 11 130 51 8 910 9 12 0 1
SU Truck %age:
3.1% 0.0% 1.1% 0.0% 1.5% 2.4% 4.8% 1.0% 0.0% 4.3% 0.4% 4.3% 2.8% 0.0% 1.3% 1.1 % 4.3% 2.9% 0.0% 4.2% 3.9%
Peak Hour Single Unit (SU) Truck & Buses Volume Summary
Hourly Total
Time Period 2nd Street Main Street 2nd Street Main Street Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume
AM 7:15 AM 1 0 0 0 1 0 18 0 0 18 0 1 1 0 2 0 34 0 0 34 55
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 0 0 0 0 0 1 25 0 0 26 0 0 1 0 1 0 12 1 0 13 40
From North From East From South From West
From South From West
PM Peak Period
Totals
AM Peak PeriodMidday Peak Period
From North From East
Single Unit (SU) Trucks & Buses
Intersection Traffic Volume Report Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Weekday Schools Not in Session
Non-Holiday No Special Events
Start Date:
Page 124 of 251
Count Basics Page 8 of 13
15-Minute Semi-Truck Data
Main Street & 2nd Street
15-Minute Semi-Truck Data
15-Minute
Time Period 2nd Street Main Street 2nd Street Main Street 15-Min Hour ly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum
6:00 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 5
6:15 AM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 3 8
6:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7
6:45 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 8
7:00 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 2 0 0 2 4 9
7:15 AM 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 1 0 0 1 2 8
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 1 8
7:45 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 2 8
8:00 AM 0 0 0 0 0 0 2 1 0 3 0 0 0 0 0 0 0 0 0 0 3 7
8:15 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 2
8:30 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1
8:45 AM 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 1
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 5
3:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 6
3:30 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 5
3:45 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 2 6
4:00 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 6
4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5
4:30 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 2 7
4:45 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 5
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 4
5:15 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 100 10 2 020 2 21 000 11 1 100 1 2 3 6
Semi Truck %age: 0.0% 3.2% 0.0% 0.0% 0.4% 0.0% 1.0% 1.0% 0.0% 0.9% 0.4% 0.0% 0.0% 0.0% 0.3% 1.1 % 0.5% 0.0% 0.0% 0.5% 0.7%
Peak Hour Semi-Truck Volume Summary
Hourly Total
Time Period 2nd Street Main Street 2nd Street Main Street Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume
AM 7:15 AM 0 0 0 0 0 0 4 2 0 6 0 0 0 0 0 1 1 0 0 2 8
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 2 0 0 2 5
From North From East From South From West
From WestFrom East From South
PM Peak Period
Totals
AM Peak PeriodMidday Peak Period
From North
Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Semi-Trucks
Weekday Schools Not in Session
Non-Holiday No Special Events
Start Date:
Intersection Traffic Volume Report
Page 125 of 251
Count Basics Page 9 of 13
15-Minute Heavy Vehicle Data
Main Street & 2nd Street
15-Minute Heavy Vehicle Data
15-Minute
Time Period 2nd Street Main Street 2nd Street Main Street 15-Min Hour ly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum
6:00 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 24
6:15 AM 0 1 0 0 1 0 1 0 0 1 0 0 0 0 0 0 6 0 0 6 8 30
6:30 AM 0 0 0 0 0 0 3 0 0 3 0 0 1 0 1 0 8 0 0 8 12 42
6:45 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 44
7:00 AM 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 5 0 0 5 8 56
7:15 AM 0 0 0 0 0 0 1 1 0 2 0 1 1 0 2 0 16 0 0 16 20 63
7:30 AM 0 0 0 0 0 0 9 0 0 9 0 0 0 0 0 1 4 0 0 5 14 53
7:45 AM 0 0 0 0 0 0 8 0 0 8 0 0 0 0 0 0 6 0 0 6 14 45
8:00 AM 1 0 0 0 1 0 4 1 0 5 0 0 0 0 0 0 9 0 0 9 15 41
8:15 AM 0 0 0 0 0 0 6 0 0 6 0 0 0 0 0 0 4 0 0 4 10
8:30 AM 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 0 1 0 0 1 6
8:45 AM 0 0 0 0 0 0 3 0 0 3 1 0 0 0 1 0 6 0 0 6 10
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 1 2 0 0 3 8 39
3:15 PM 0 0 1 0 1 0 3 0 0 3 0 0 0 0 0 0 4 0 0 4 8 50
3:30 PM 0 0 1 0 1 1 5 0 0 6 0 0 0 0 0 0 0 0 0 0 7 52
3:45 PM 0 0 0 0 0 0 10 2 0 12 1 0 0 0 1 0 3 0 0 3 16 61
4:00 PM 1 0 0 0 1 0 14 0 0 14 0 0 0 0 0 0 4 0 0 4 19 54
4:15 PM 0 0 0 0 0 1 7 0 0 8 0 0 0 0 0 0 2 0 0 2 10 45
4:30 PM 0 0 0 0 0 0 10 0 0 10 0 0 0 0 0 0 6 0 0 6 16 39
4:45 PM 0 0 0 0 0 0 6 0 0 6 0 0 0 0 0 0 3 0 0 3 9 27
5:00 PM 0 0 0 0 0 0 5 0 0 5 0 0 1 0 1 0 3 1 0 4 10 23
5:15 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 2 0 0 2 4
5:30 PM 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 1 0 0 1 4
5:45 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 3 0 0 3 5
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2 1 2 0 5 2 117 4 0 123 2 1 3 0 6 2 100 1 0 103 237
Total Truck %age: 3.1% 3.2% 1.1% 0.0% 1.8% 2.4% 5.7% 1.9% 0.0% 5.3% 0.7% 4.3% 2.8% 0.0% 1.5% 2.1 % 4.9% 2.9% 0.0% 4.7% 4.6%
Peak Hour Heavy Vehicle Volume Summary
Hourly Total
Time Period 2nd Street Main Street 2nd Street Main Street Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume
AM 7:15 AM 1 0 0 0 1 0 22 2 0 24 0 1 1 0 2 1 35 0 0 36 63
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 0 0 0 0 0 1 28 0 0 29 0 0 1 0 1 0 14 1 0 15 45
From North From East From South From West
From South From West
PM Peak Period
Totals
AM Peak PeriodMidday Peak Period
From North From East
Heavy Vehicles (Single-Unit Trucks, Buses & Semi-Trucks)
Intersection Traffic Volume Report Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Weekday Schools Not in Session
Non-Holiday No Special Events
Start Date:
Page 126 of 251
Count Basics Page 10 of 13
15-Minute Heavy Vehicle Percentages
Main Street & 2nd Street
15-Minute Heavy Vehicle Percentages
Total Hourly
15-Minute Heavy Heavy
Time Period 2nd Street Main Street 2nd Street Main Street Vehicle Veh icle
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Percent Percent
6:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 5.0 0.0 0.0 4.8 0.0 0.0 0.0 0.0 0.0 0.0 2.4 0.0 0. 0 2.4 2.9 5.3
6:15 AM 0.0 100.0 0.0 0.0 33.3 0.0 2.6 0.0 0.0 2.4 0.0 0.0 0.0 0.0 0.0 0.0 10.7 0 .0 0.0 10.5 7.4 5.5
6:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 10.0 0.0 0.0 9.1 0.0 0.0 33.3 0.0 12.5 0.0 10.1 0 .0 0.0 10.0 9.1 6.6
6:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 2.7 0.0 0.0 2.4 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0 0. 0 1.1 1.4 6.1
7:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 7.0 0.0 0.0 6.3 0.0 0.0 0.0 0.0 0.0 0.0 5.7 0.0 0. 0 5.4 4.9 7.0
7:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 2.3 25.0 0.0 4.0 0.0 50.0 14.3 0.0 9.1 0.0 15.2 0 .0 0.0 14.7 10.2 7.5
7:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 15.5 0.0 0.0 13.0 0.0 0.0 0.0 0.0 0.0 14.3 4.0 0. 0 0.0 4.5 6.7 6.4
7:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 11.9 0.0 0.0 9.5 0.0 0.0 0.0 0.0 0.0 0.0 6.3 0.0 0 .0 5.8 6.0 5.5
8:00 AM 25.0 0.0 0.0 0.0 9.1 0.0 7.4 12.5 0.0 7.9 0.0 0.0 0.0 0.0 0.0 0.0 8.9 0.0 0.0 8.3 7.5 5.3
8:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 10.7 0.0 0.0 8.8 0.0 0.0 0.0 0.0 0.0 0.0 4.7 0.0 0 .0 4.3 5.2
8:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 6.8 0.0 0.0 5.6 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.0 0. 0 1.2 3.2
8:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 4.9 0.0 0.0 4.1 10.0 0.0 0.0 0.0 5.9 0.0 6.2 0.0 0 .0 6.1 5.1
9:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
10:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
10:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
10:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
10:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
11:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
11:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
11:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
11:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
12:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
12:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
12:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
12:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
1:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
1:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
1:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
1:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
2:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
2:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
2:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
2:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
3:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 5.3 0.0 0.0 4.9 0.0 0.0 0.0 0.0 0.0 16.7 2.9 0.0 0 .0 3.9 3.8 4.4
3:15 PM 0.0 0.0 14.3 0.0 9.1 0.0 3.0 0.0 0.0 2.7 0.0 0.0 0.0 0.0 0.0 0.0 4.8 0.0 0 .0 4.4 3.5 5.2
3:30 PM 0.0 0.0 16.7 0.0 11.1 50.0 6.0 0.0 0.0 6.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 3.3 5.1
3:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 8.7 15.4 0.0 9.2 10.0 0.0 0.0 0.0 6.3 0.0 4.0 0.0 0.0 3.8 6.7 5.4
4:00 PM 16.7 0.0 0.0 0.0 4.8 0.0 10.5 0.0 0.0 9.5 0.0 0.0 0.0 0.0 0.0 0.0 4.9 0.0 0.0 4.6 6.7 4.7
4:15 PM 0.0 0.0 0.0 0.0 0.0 14.3 4.9 0.0 0.0 5.0 0.0 0.0 0.0 0.0 0.0 0.0 2.2 0.0 0 .0 2.1 3.5 3.8
4:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 6.9 0.0 0.0 6.0 0.0 0.0 0.0 0.0 0.0 0.0 5.5 0.0 0. 0 5.1 4.9 3.4
4:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 4.8 0.0 0.0 4.2 0.0 0.0 0.0 0.0 0.0 0.0 3.8 0.0 0. 0 3.7 3.5 2.4
5:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 3.1 0.0 0.0 2.9 0.0 0.0 20.0 0.0 6.3 0.0 3.2 100. 0 0.0 4.3 3.4 2.1
5:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 1.8 0.0 0.0 1.6 0.0 0.0 0.0 0.0 0.0 0.0 1.7 0.0 0. 0 1.6 1.4
5:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 2.2 0.0 0.0 1.9 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0 0. 0 1.1 1.4
5:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 1.8 0.0 0.0 1.5 0.0 0.0 0.0 0.0 0.0 0.0 4.1 0.0 0. 0 3.7 2.1
6:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
6:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
6:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
6:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
7:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
7:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
7:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
7:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
8:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
8:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
8:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
8:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
3.1 3.2 1.1 0.0 1.8 2.4 5.7 1.9 0.0 5.3 0.7 4.3 2.8 0.0 1.5 2.1 4.9 2.9 0.0 4.7 4.6
Semi Truck Percentage: 0.6943
Peak Hour Heavy Vehicle Percentages Summary
Hourly
Hourly Heavy
Time Period 2nd Street Main Street 2nd Street Main Street Vehicle
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Percent
AM 7:15 AM 11.1 0.0 0.0 0.0 1.9 0.0 9.9 6.7 0.0 9.0 0.0 16.7 5.6 0.0 2.2 5.0 8.7 0.0 0.0 8.4 7.5
MD 12:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
PM 4:15 PM 0.0 0.0 0.0 0.0 0.0 4.5 4.9 0.0 0.0 4.5 0.0 0.0 3.4 0.0 1.2 0.0 3.8 50.0 0 .0 3.9 3.8
From North From East From South From West
From South From WestFrom East
Intersection Traffic Volume Report Start Date: Tuesday, August 5, 2025
Total Number of Hours Counted: 6
PM Peak Period
Totals
AM Peak PeriodMidday Peak Period
From North
%
Weekday Schools Not in Session
Non-Holiday
Heavy Vehicles (Single-Unit Trucks, Buses & Semi-Trucks)
No Special Events
Page 127 of 251
Page 11 of 13
15-Minute Pedestrian and Bicyclist Data
Main Street & 2nd Street
15-Minute Pedestrian and Bicyclist Data
15-Minute
Time Period 2nd Street Main Street 2nd Street Main Street 15-Min Hour ly
Start Time Total Total Total Total Totals Sum
6:00 AM 0020 2 9
6:15 AM 0030 3 9
6:30 AM 0010 1 1 1
6:45 AM 2010 3 1 5
7:00 AM 0011 2 1 5
7:15 AM 0140 5 1 9
7:30 AM 0221 5 2 4
7:45 AM 2001 3 3 3
8:00 AM 0042 6 4 3
8:15 AM 0226 1 0
8:30 AM 1337 1 4
8:45 AM 0436 1 3
9:00 AM 0000 0
9:15 AM 0000 0
9:30 AM 0000 0
9:45 AM 0000 0
10:00 AM 0000 0
10:15 AM 0000 0
10:30 AM 0000 0
10:45 AM 0000 0
11:00 AM 0000 0
11:15 AM 0000 0
11:30 AM 0000 0
11:45 AM 0000 0
12:00 PM 0000 0
12:15 PM 0000 0
12:30 PM 0000 0
12:45 PM 0000 0
1:00 PM 0000 0
1:15 PM 0000 0
1:30 PM 0000 0
1:45 PM 0000 0
2:00 PM 0000 0
2:15 PM 0000 0
2:30 PM 0000 0
2:45 PM 0000 0
3:00 PM 9 8 13 2 32 102
3:15 PM 13 4 5 3 25 85
3:30 PM 9646 2 5 6 9
3:45 PM 5384 2 0 5 3
4:00 PM 3255 1 5 4 2
4:15 PM 2106 9 3 7
4:30 PM 0225 9 5 6
4:45 PM 3006 9 6 3
5:00 PM 0253 1 0 6 5
5:15 PM 13 8 2 5 28
5:30 PM 3445 1 6
5:45 PM 3224 1 1
6:00 PM 0000 0
6:15 PM 0000 0
6:30 PM 0000 0
6:45 PM
0000 0
7:00 PM 0000 0
7:15 PM 0000 0
7:30 PM 0000 0
7:45 PM 0000 0
8:00 PM 0000 0
8:15 PM 0000 0
8:30 PM 0000 0
8:45 PM 0000 0
9:00 PM 0000 0
9:15 PM 0000 0
9:30 PM 0000 0
9:45 PM 0000 0
68 54 76 78 276
Special Pedestrians
Pedestrian Type
Other (None)
Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Start Date:
Count Basics
Unknown
West Approach
00
Pedestrians and Bicyclists
00 00
41
33
2
00 00 0
0
00
00 00
00 00 00
00
00
00
Crossing
0
00 00
00 0
00 00
00 000
Crossing Crossing
0
00
North Approach East Approach South Approach
00
000
00 00 00
00
00 00 0
00 00 00
PM Peak Period
00 0
0
0
0
00 0
30 20 20
13 0
00
00
00
4
00 00 00 00
00 00 00
00 0 00
00 00 00
00 00 00 00
0
30 40 40 50
80 20
01 14 12 1
30 00 00
4
00 20 20 50
20 10 00
40
30 02 50 50
41 21 53
12
54 60 40 42
1 1 24 05 0
00
90 71 1 3 0 20
00 00 00
00
00 00 00 00
00 00 00
00
00 00 00 00
00 00 00
00
00
00 00 00 00
00 00 00
00
00
00 00 00
00 00 00
0
00
00
00 00 00 00
00 00 00
00
00 00 00 00
00 00 00
00
00 00 00 00
00 00 00
00
00 00 00 00
00 00 00
00
00 00 00 00
000 00
3
30 60
0
14
0
00 000
4200 20
00 04 02
2
0
0
00 11
0
00 01
00 10 40 0
01
Crossing
00 0
0
02 0
0
Pedestrian Bicyclist Pedestrian
00
0
0
0
0
00
Bicyclist
0
0
0
0
AM Peak Period
0
Midday Peak Period
2
0
0
0
0
0
0
0
03
00 0
0
0
00
4
0
1
Pedestrian Bicyclist
20
00
00
0
0
30
10
0
010
6
0
11
0
00
2
00 00
0
00 00
0
1
00 00
0
Elderly/Disabled (except wheelchai
Wheelchairs/Electric Scooters
x
x
x
x
x
x
1 or 2 A Few Several Many
Weekday Schools Not in Session
Non-Holiday No Special Events
Totals 59 9 48
None
Pre-school Children
Elementry School Age Children
Visually Impaired (white cane/help
e
59 19
Pedestrian Bicyclist
00
70
0
6
0
0
00
00
0
10
Intersection Traffic Volume Report
Page 128 of 251
Page 12 of 13
15-Minute Adult & Children Count (Manual Entry)
Main Street & 2nd Street
15-Minute Adult & Children Pedestrian Data
15-Minute
Time Period 2nd Street Main Street 2nd Street Main Street 15-Min Hour ly
Start Time Total Total Total Total Totals Sum
12:00 AM 0000 0 0
12:15 AM 0000 0 0
12:30 AM 0000 0 0
12:45 AM 0000 0 0
1:00 AM 0000 0 0
1:15 AM 0000 0 0
1:30 AM 0000 0 0
1:45 AM 0000 0 0
2:00 AM 0000 0 0
2:15 AM 0000 0 0
2:30 AM 0000 0 0
2:45 AM 0000 0 0
3:00 AM 0000 0 0
3:15 AM 0000 0 0
3:30 AM 0000 0 0
3:45 AM 0000 0 0
4:00 AM 0000 0 0
4:15 AM 0000 0 0
4:30 AM 0000 0 0
4:45 AM 0000 0 0
5:00 AM 0000 0 0
5:15 AM 0000 0 2
5:30 AM 0000 0 5
5:45 AM 0000 0 6
6:00 AM 0020 2 9
6:15 AM 0030 3 9
6:30 AM 0010 1 1 1
6:45 AM 2010 3 1 2
7:00 AM 0011 2 1 0
7:15 AM 0140 5 1 4
7:30 AM 0110 2 1 7
7:45 AM 0001 1 2 5
8:00 AM 0042 6 3 7
8:15 AM 0224 8 3 1
8:30 AM 1324 1 0 2 3
8:45 AM 0436 1 3 1 3
9:00 AM 0000 0 0
9:15 AM 0000 0 0
9:30 AM 0000 0 0
9:45 AM 0000 0 0
10:00 AM 0000 0 0
10:15 AM 0000 0 0
10:30 AM 0000 0 0
10:45 AM 0000 0 0
11:00 AM 0000 0 0
11:15 AM 0000 0 0
11:30 AM 0000 0 0
11:45 AM 0000 0 0
12:00 PM 0000 0 0
12:15 PM 0000 0 0
12:30 PM 0000 0 0
12:45 PM 0000 0 0
1:00 PM 0000 0 0
1:15 PM 0000 0 0
1:30 PM 0000 0 0
1:45 PM 0000 0 0
2:00 PM 0000 0 0
2:15 PM 0000 0 3 1
2:30 PM 0000 0 5 2
2:45 PM 0000 0 7 1
3:00 PM 9 7 13 2 31 86
3:15 PM 11 4 5 1 21 68
3:30 PM 5644 1 9 5 2
3:45 PM 4254 1 5 4 2
4:00 PM 3055 1 3 3 3
4:15 PM 2102 5 2 7
4:30 PM 0225 9 4 9
4:45 PM 3003 6 5 6
5:00 PM 0142 7 6 1
5:15 PM 13 8 2 4 27 54
5:30 PM 3445 1 6 2 7
5:45 PM 3224 1 1 1 1
6:00 PM 0000 0 0
6:15 PM 0000 0 0
6:30 PM 0000 0 0
6:45 PM 0000 0 0
7:00 PM 0000 0 0
7:15 PM 0000 0 0
7:30 PM 0000 0 0
7:45 PM 0000 0 0
8:00 PM 0000 0 0
8:15 PM 0000 0 0
8:30 PM 0000 0 0
8:45 PM 0000 0 0
9:00 PM 0000 0 0
9:15 PM 0000 0 0
9:30 PM 0000 0 0
9:45 PM 0000 0 0
10:00 PM 0000 0 0
10:15 PM 0000 0 0
10:30 PM 0000 0 0
10:45 PM 0000 0 0
11:00 PM 0000 0 0
11:15 PM 0000 0
11:30 PM 0000 0
11:45 PM 0000 0
59 48 70 59 236
Count Basics
Start Date: Tuesday, August 5, 2025 Weekday Schools Not in Session
Total Number of Hours Counted: 6 Non-Holiday No Special Events
Adults Children Adults Children Adults Children Adults Children
Adults & Children
Crossing Crossing Crossing Crossing
North Approach East Approach South Approach West Approach
0
000
0
3
20
0
10
001
1
0140
001
0
0001
011
2
0224
004
4
0436
132
0
0000
000
0
Midday Peak Period
0
0000
000
0
0
0
0000
000
0
0000
000
0
0000
000
0
0000
000
0
0000
000
PM Peak Period
000
00
000
11 4 5
0
0000
0
00
9 7 13 2
1
4
4254
564
5
2102
305
5
3003
022
2
1 3 824
014
5
3224
344
0
0000
000
0
0000
000
0
0000
000
0
0000
000
0
0000
000
0
0000
000
0
0000
000
0
0000
000
05 9 0Totals 59 0 48 0 70
0
0
0
00
00
0
0
0
0
0
0
0
0
0
0
20
AM Peak Period Pre-AM Peak Period
0000
0000
0000
0
000
0000
0000
000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0
0
0
0
0
0
0000
0000
0000
0000
Intersection Traffic Volume Report
0000
0000
Post PM Peak Period
000
Page 129 of 251
Count Basics Page 13 of 1 3
15-Minute Bicycle Turning Movement Count (Manual Entry)
Main Street & 2nd Street
15-Minute Bicycle Data
15-Minute
Time Period 2nd Street Main Street 2nd Street Main Street 15-Min Hour ly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum
12:00 AM 0000 0 0
12:15 AM 0000 0 0
12:30 AM 0000 0 0
12:45 AM 0000 0 0
1:00 AM 0000 0 0
1:15 AM 0000 0 0
1:30 AM 0000 0 0
1:45 AM 0000 0 0
2:00 AM 0000 0 0
2:15 AM 0000 0 0
2:30 AM 0000 0 0
2:45 AM 0000 0 0
3:00 AM 0000 0 0
3:15 AM 0000 0 0
3:30 AM 0000 0 0
3:45 AM 0000 0 0
4:00 AM 0000 0 0
4:15 AM 0000 0 0
4:30 AM 0000 0 0
4:45 AM 0000 0 0
5:00 AM 0000 0 0
5:15 AM 0000 0 0
5:30 AM 0000 0 0
5:45 AM 0000 0 0
6:00 AM 0000 0 0
6:15 AM 0000 0 0
6:30 AM 0000 0 0
6:45 AM 0000 0 0
7:00 AM 0000 0 0
7:15 AM 0000 0 0
7:30 AM 0000 0 0
7:45 AM 0000 0 0
8:00 AM 0000 0 0
8:15 AM 0000 0 0
8:30 AM 0000 0 0
8:45 AM 0000 0 0
9:00 AM 0000 0 0
9:15 AM 0000 0 0
9:30 AM 0000 0 0
9:45 AM 0000 0 0
10:00 AM 0000 0 0
10:15 AM 0000 0 0
10:30 AM 0000 0 0
10:45 AM 0000 0 0
11:00 AM 0000 0 0
11:15 AM 0000 0 0
11:30 AM 0000 0 0
11:45 AM 0000 0 0
12:00 PM 0000 0 0
12:15 PM 0000 0 0
12:30 PM 0000 0 0
12:45 PM 0000 0 0
1:00 PM 0000 0 0
1:15 PM 0000 0 0
1:30 PM 0000 0 0
1:45 PM 0000 0 0
2:00 PM 0000 0 0
2:15 PM 0000 0 0
2:30 PM 0000 0 0
2:45 PM 0000 0 0
3:00 PM 0000 0 0
3:15 PM 0000 0 0
3:30 PM 0000 0 0
3:45 PM 0000 0 0
4:00 PM 0000 0 0
4:15 PM 0000 0 0
4:30 PM 0000 0 0
4:45 PM 0000 0 0
5:00 PM 0000 0 0
5:15 PM 0000 0 0
5:30 PM 0000 0 0
5:45 PM 0000 0 0
6:00 PM 0000 0 0
6:15 PM 0000 0 0
6:30 PM 0000 0 0
6:45 PM 0000 0 0
7:00 PM 0000 0 0
7:15 PM 0000 0 0
7:30 PM 0000 0 0
7:45 PM 0000 0 0
8:00 PM 0000 0 0
8:15 PM 0000 0 0
8:30 PM 0000 0 0
8:45 PM 0000 0 0
9:00 PM 0000 0 0
9:15 PM 0000 0 0
9:30 PM 0000 0 0
9:45 PM 0000 0 0
10:00 PM 0000 0 0
10:15 PM 0000 0 0
10:30 PM 0000 0 0
10:45 PM 0000 0 0
11:00 PM 0000 0 0
11:15 PM 0000 0
11:30 PM 0000 0
11:45 PM 0000 0
0 000 00 000 00 000 00 000 0 0
Peak Hour Bicycle Turning Movement Volume Summary
Hourly Total
Time Period 2nd Street Main Street 2nd Street Main Street Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume
AM 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
From North From East From South From West
Post PM Peak Period AM Peak PeriodPM Peak Period
Totals
Schools Not in Session
Total Number of Hours Counted: 6 Non-Holiday No Special Events
Midday Peak Period
Bicyclists
From North
Pre-AM Peak Period
Start Date: Tuesday, August 5, 2025 Weekday
From East From South From West
Intersection Traffic Volume Report
Page 130 of 251
Count Basics Special Report
15-Minute Motor Vehicle Data (Daily & Seasonally Adjusted)
Main Street & 2nd Street
15-Minute Motor Vehicle Data
15-Minute
Time Period 2nd Street Main Street 2nd Street Main Street 15-Min Hour ly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum PHF
12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 AM 0 0 1 0 1 0 18 1 0 19 4 0 1 0 5 1 36 0 0 37 62 402 0.77
6:15 AM 0 1 2 0 3 0 34 3 0 37 4 0 1 0 5 0 49 1 0 50 95 483 0.84
6:30 AM 4 0 5 0 9 0 26 3 0 29 4 0 3 0 7 1 69 0 0 70 115 563 0.80
6:45 AM 1 0 3 0 4 2 32 3 0 37 10 0 1 0 11 4 72 2 0 78 130 634 0.85
7:00 AM 1 1 4 0 6 1 38 4 0 43 11 0 3 0 14 0 76 4 0 80 143 707 0.87
7:15 AM 4 0 11 0 15 3 38 4 0 45 11 2 6 0 19 1 92 3 0 96 175 739 0.91
7:30 AM 1 0
Text truncated. Open the original for the full document.
Source: Village of Mount Horeb website. First collected Oct 25, 2026.