Meeting Agenda & Packet
Village of Mount Pleasant · Racine County · meeting of Mar 18, 2026 · Agenda packets
Open the original document More from Village of Mount Pleasant
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Ron Molar, Chair
Karen Sorenson, Member
Don Nutall, Member
Tom Young, Member
Russ Weyers, Alternate Member
Chuck Christoffersen, Member
A.
CALL TO ORDER
B.
ROLL CALL
C.
MEETING MINUTES
1.
August 20, 2025, Meeting Minutes
D.
OLD BUSINESS
E.
NEW BUSINESS
1.
12023 Durand Avenue Zoning Variance; ZVA-26-01
Public Hearing regarding ZVA-26-01
Consideration of ZVA-26-01
F.
ADJOURN
ZONING BOARD OF APPEALS AGENDA
March 18, 2026
5:30 PM
Village Hall, Room B114 Ebe Auditorium
8811 Campus Drive, Mount Pleasant, WI 53406
2025-08-20 Meeting Minutes
Transparency Narrative
Parapet Narrative
Site Plans
Building Elevation
Requests for persons with disabilies who need assistance to parcipate in this meeng or hearing should be made to the
Village Administrator or Village Clerk's Office at (262) 664-7800 with as much advance noce as possible.
1
Page 1
ZONING BOARD OF APPEALS MEETING MINUTES
August 20, 2025, at 5:30 PM
Village Hall, B114 Ebe Auditorium
8811 Campus Drive, Mount Pleasant, WI 53406
Staff Present: Community Development Director Samuel Schutz, and Village Treasurer Brandi Baker
A. CALL TO ORDER
Chair R. Molnar called the meeting to order at 5:30 PM.
B. ROLL CALL
Treasurer Baker called the roll. Chair R. Molnar, K. Sorenson, D. Nutall, T. Young , R. Weyers, and G. Paulick
were present. The meeting had a quorum of six members.
C. MEETING MINUTES
1. June 18, 2025
Motion by K. Sorenson to approve the minutes from the June 18, 2025 meeting. Motion seconded by T.
Young. On voice vote, motion carried 6-0.
D. OLD BUSINESS
None
E. NEW BUSINESS
1. 9356 Old Spring Street Zoning Variance; ZVA-25-04
Community Development Director Samuel Schutz led the discussion regarding the application for a variance
from Code of Ordinances § 90-110.70 Lot and building regulations. The section sets
a maximum accessory building height of 1.5 stories in the RL zoning district (18 feet). The applicant applied
for a 26-foottall accessory building. The Board of Appeals previously approved this variance in 2023; however,
the applicant did not pull a permit within a year, so by ordinance the previous variance expired. R. Molnar
inquired if anything besides the time has changed since the original approval. S. Schultz explained there has
been some changes regarding feet to stories in the zoning code. D. Nutall inquired about any DNR concerns
in 2023. S. Schultz did not remember there being any.
a. Public hearing regarding ZVA-25-04
R. Molnar opened the public hearing.
Shawn Klinzing 9356 Old Spring Street Owner of the property spoke regarding his application, he feels that
the pole barn fits others in the neighborhood and this would allow him to fit his trucks. He runs a tree cutting
business and there are 5 vehicles in his fleet.
G. Paulick asked Mr. Klinzing why he didn’t proceed in 2023 after the initial approval. Mr. Klinzing explained
there was some financial hardships and he ultimately went with a different builder.
b. Consideration of ZVA-25-04
Motion by D. Nutall to approve ZVA-25-04 based on evidence presented that the application does not meet
the review criteria and standards of § 90-420.80, with staff recommendation # 1, The applicant may not grade
or impact the environmental corridor in the northeast corner of the property (the green areas shown in the
maps below). Motion seconded by G. Paulick. K. Sorenson spoke in favor of also using staff recommendation
#2.
Motion by D. Nutall to amend the motion to approve ZVA-25-04 based on evidence presented that the
application does not meet the review criteria and standards of § 90-420.80, with staff recommendation # 1,
the applicant may not grade or impact the environmental corridor in the northeast corner of the property
(The green areas shown in the maps below) and #2, the application must receive a determination from the
Wisconsin DNR that the unnamed stream in not navigable; otherwise, shoreland zoning setbacks apply to the
subject area. With a time limit of 45 days for the DNR to respond. Motion seconded by G. Paulick. ROLL CALL
2
Page 2
VOTE: K. Sorenson-aye, D. Nutall-aye, T. Young-aye, R. Weyers-aye, G. Paulick-aye, R. Molnar-aye. Motion
carried 6-0.
F. ADJOURN
Chair R. Molnar adjourned the meeting at 5:46pm.
3
Executive Summary
Zoning Board of Appeals Meeting of March 18, 2026
12023 Durand Avenue Zoning Variance; ZVA-26-01
1
.
Public Hearing regarding ZVA-26-01
2
.
Consideration of ZVA-26-01
BACKGROUND
The applicant applied for two variances on behalf of Microsoft Corporation.
1
.
From
90-130.40: Lot and building regulations
, which requires a minimum street-facing ground-story and
upper-story transparency for principal buildings within the C-4 district at 20% and 10%, respectively.
2
.
From
§ 90-405.30: Building roofs
, which states, “Architects shall enclose flat roofs with parapets at least 36
inches high.”
COMPREHENSIVE PLAN
This application complies with the Comprehensive Plan, which lists the property as Business Park. The Bicycle Plan
does not show any recommended improvements adjacent to the subject property. The Park and Open Space Plan
shows minor, farmed wetlands within the subject property, some of which the Wisconsin Department of Natural
Resources permitted the applicant to fill. It also depicts Braun Road as a corridor recommended for an enhanced
bicycle facility. The Wisconsin Department of Transportation constructed an off-street multi-purpose pathway in
line with this recommendation when they last reconstructed Braun Road in a multi-road reconstruction project
with the village and Racine County.
ZONING
The Board of Appeals may find the review criteria and standards for which they must review these applications
within
§ 90-560.80
.
Transparency
The applicant argued their justification for their variance application within the contained narrative documents.
The staff agree the variance is warranted, because due the village's noise regulations, the applicant must
construct a series of large, precast sound walls to meet the regulations within
§ 90-450.70: Noise
. These walls
effectively block much of the building facade from public view the buildings. Within the buildings, the mechanical
equipment protrusions on the building facades render the architectural glazing from inside to outside difficult.
The Board of Appeals granted similar variances for the Microsoft data centers located at 4800 90th Street and
4811 CTH H. Due to this being the third zoning variance for this issue, the village staff will prepare recommended
changes to the zoning ordinance to better address conflicts between building design regulations and performance
standards such as noise.
Parapets
The application meets subsections (b)(2), (3), and (5) of
§ 90-405.40: Alternative compliance
. Therefore, the
applicant does not need a variance from § 90-405.30. Furthermore,
§ 90-560.30(d)
limits when an applicant may
apply for zoning variances when alternative compliance procedures may apply.
STRATEGIC PLAN
4
The application meets the following Key Strategies and Outcomes of the Strategic Plan.
Safe Community
Outcome: Safety in the public right-of-way for all modes of transportation.
The Village's public infrastructure allows a smooth flow of vehicle traffic and offers safe
routes for bicyclists and pedestrians.
Balance Growth and Development
Outcome: Welcoming and competitive community for a variety of housing types and commercial
development.
Development processes are streamlined, fair, and predictable for both developers and
citizens, encouraging companies and individuals to invest in the Village.
Outcome: Long-term local and regional benefits of Tax Incremental District No. 5.
Growth of jobs and tax base continues in TID No. 5, creating resources to support initiatives
that will benefit the Village and entire region for generations.
RECOMMENDATION
The staff recommends a motion by the Board of Appeals to:
1
.
Approve the zoning variance for § 90-130.40 based on their findings of fact regarding the criteria.
2
.
Deny the zoning variance for § 90-405.30 based on the rationale contained within the Zoning section of
this staff report
.
PREPARED BY
Samuel Schultz, Community Development Director
5
13737 Noel Road, Galleria North Tower, Suite 700 \ Dallas, Texas 75240
O (972) 455-3100 \ burnsmcd.com
Page 1 of 5
February 17, 2026
Samuel Schultz, AICP, CNU-A
Community Development Director
Village of Mount Pleasant
8811 Campus Drive
Mount Pleasant, WI 53406
Zoning Variance
MKE Area 2
Principal Building Design - Section 90-130-2 (c)
Street Facing Ground Story Transparency
Mr. Schultz,
On behalf of the property owner, Microsoft Corporation, we are submitting a Zoning Variance
request under the regulations of Division 90-560 of the Village of Mount Pleasant Zoning
Ordinance. The subject property is 791.3 acres, further defined as Tax Parcel ID: 151-03-22-
29-01-001 is located at Section 29, T3N, R22E and Section 30, T3N, R22E, zoned General
Industrial (C-4) and located Tax Increment District No. 151 (TID 151).
The owner is actively pursuing final development approvals to permit a data center use on this
property. This is a permitted use in the C-4 Zoning District and meets the complimentary Land
Use and Economic Development goals, objective and polices defined in the “Multi-
Jurisdictional Comprehensive Plan for Racine County: 2035”, the “Mount-Pleasant-
Wisconsin-Year-2035-Master-Plan” and the “TID 5 -Comprehensive-Plan-of-Redevelopment”
documents. The development plans align with the industrial land use zoning and planned land
use envisioned on site. The existing public infrastructure specifically, water, power, sewer and
transportation, are critical components of the property’s suitability for data center
development. The development plans support the many policies which promote industrial
use, associated diverse employment opportunities, and diversified tax base. The proposed
data center use specifically aligns to Racine County’s EDP goals for targeted business with
“emerging industries”.
Division 90-130.40 of the Village of Mount Pleasant Zoning Ordinance regulates the lot and
building regulations. Specifically, Section 90 -130-2 (C) states:
6
MKE Area 2
Zoning Variance -Section 90-130-2 (C)
February 17, 2026
___________________________
For reasons justified below we make the following formal request:
Variance Request - Section 90-130-2(C)
• Approve a variance to allow 0% façade transparency for the following facades of
street facing ground story elevations:
o North facades of buildings MKE 07, 08 and 09 facing Durand Avenue
o South facades of buildings MKE 11, 12 and 13 facing Braun Road.
o West facades of buildings MKE 14 & 15 facing Hewitt Memorial Drive
7
MKE Area 2
Zoning Variance -Section 90-130-2 (C)
February 17, 2026
Justification
Street Facing Ground Story Transparency:
• Project description: Buildings MKE 07–15 are nine (9) one-story buildings located
along Durand Ave, Braun Road, and Hewitt Memorial Drive, comprising the MKE
Area 2 campus. Each one-story building includes a data center with a small
administration area located on one of the short sides of the building. Equipment
yards are located along both long sides of each building.
o The Area 2 Campus also includes a Campus Amenities Building which is
centrally located on the campus. The Campus Amenities Building does not
have any facades that face the street, so the ground floor transparency
requirements don’t apply to this building
• Operational/security constraints: The data center (data hall) portions of the
buildings have stringent security requirements that prohibit large amounts of
glazing in areas containing server racks. These requirements also restrict exterior
openings and limit doors to those necessary for life safety egress and service
access. In addition, there are no regularly occupied spaces on the street-facing
sides of the buildings that could reasonably accommodate windows. Due to the
technical and functional nature of this building type, achieving the required 20%
street-facing ground-story transparency is not feasible.
• Noise ordinance mitigation / visibility from right-of-way: To comply with the
zoning code noise ordinance requirements, a precast concrete sound wall will be
installed along Durand Ave, Braun Road, and Hewitt Memorial Drive. Due to the
height of the sound wall, much of the building façade will be obscured from the
public right-of-way, and the 20% street-facing ground-story transparency
requirement would not be visible from the right-of-way along these frontages.
90-560.80 – Review Criteria
Pursuant to § 62.23(7)(e)7, Wis. Stats., a zoning variance may not be approved unless the Zoning
Board of Appeals finds, based on evidence presented by the subject property owner, that:
1. There are conditions unique to the subject property that do not apply generally to other
properties in the district.
• The ordinance permits a data center building type on the subject property. Due to the
technical and operational requirements of a data center, it is not feasible to provide
typical façade transparency and glazing along significant portions of the building
envelope. Specifically, the street-facing façades of Buildings MKE 07–15 contain data
hall areas where direct exterior openings (doors and windows) are restricted to meet
security and controlled-access requirements. In addition, a sound wall is proposed
along all three right -of-ways to address on-site noise restrictions and will obscure
most of the façades in question from the public right-of-way. These operational and
security constraints are unique to this facility type and do not apply generally to other
properties in the district.
2. The variance is not contrary to the spirit, purpose, and intent of the regulations of this zoning
chapter and is not contrary to the public interest;
• Granting the requested variance is not contrary to the spirit, purpose, and intent of
the zoning regulations and is not contrary to the public interest. The proposed data
8
MKE Area 2
Zoning Variance -Section 90-130-2 (C)
February 17, 2026
center use is a permitted use in the C-4 district, and the minimum façade
transparency requirement, as applied to street-facing data hall areas, conflicts with
the operational and security needs of this building type. Without the requested
variance to allow reduced/0% transparency on the identified façades, the permitted
data center use would not be feasible on the subject property.
3. Strict compliance with applicable zoning regulations would unreasonably prevent use of the
property for a permitted purpose or would render compliance with the chapter unnecessarily
burdensome;
• Strict compliance with the minimum façade transparency requirement would
unreasonably prevent development of a permitted data center use on the property
and would make compliance not reasonably achievable. As a permitted use in the
C-4 district, a data center requires secure, controlled-access data hall areas that
limit exterior doors and windows. Requiring transparency on these street-facing
data hall façades would conflict with operational and security needs, making the
permitted use not feasible without the requested variance. Additionally, the sound
wall required to address on-site noise restrictions will obscure most of these
façades from public view.
4. The alleged hardship is created by the terms of the chapter rather than by a person who has
a present interest in the property;
• The hardship is created by the application of the chapter’s minimum façade
transparency standard to a permitted data center building type, rather than by any
action of the owner/applicant. The data hall program and associated security
requirements are inherent to the permitted use; therefore, the need for reduced/0%
transparency on the identified façades results from the ordinance standard as
applied to this use. The sound wall is also required due to site noise restrictions,
independent of the applicant’s actions.
5. The proposed variance will not create substantial detriment to adjacent property; and
• The requested variance will not create substantial detriment to adjacent properties.
Surrounding sites are similarly zoned (C -4) and are anticipated to develop with
general industrial/light industrial buildings that commonly have limited street-facing
transparency due to operational constraints.
6. The proposed variance will not result in building or development that is incompatible with the
character of the immediate neighborhood.
• The proposed variance will not result in development that is incompatible with the
character of the immediate neighborhood. The proposed data center campus is
consistent with the industrial land use zoning and the planned land use envisioned
for the site, and it supports the Land Use and Economic Development goals and
objectives identified in applicable regional policy documents. The property’s existing
public infrastructure, including water, power, sewer, and transportation, is well
suited to support data center development. The project advances policies that
promote industrial uses, associated employment opportunities, and a diversified tax
base, and the proposed data center use aligns with Racine County’s EPD goals for
targeted business growth in “emerging industries.
9
MKE Area 2
Zoning Variance -Section 90-130-2 (C)
February 17, 2026
We appreciate your consideration of this administrative waiver. Should you have any
questions about the information or request as presented, reach out anytime. We’d be happy
to discuss this further as necessary.
Sincerely,
Aditi Padki, AIA
Associate Architect/Department Manager
Burns and McDonnell
Attachments:
1. Exhibit 01- Typical street facing building elevations
2. Exhibit 02- Site plan (Showing Sound wall location)
10
13737 Noel Road, Galleria North Tower, Suite 700 \ Dallas, Texas 75240
O (972) 455-3100 \ burnsmcd.com
Page 1 of 4
February 17, 2026
Samuel Schultz, AICP, CNU-A
Community Development Director
Village of Mount Pleasant
8811 Campus Drive
Mount Pleasant, WI 53406
Zoning Variance
MKE Area 2
Architectural Standards - Section 90-405
Building Roofs- Section 90-405.30
Mr. Schultz,
On behalf of the property owner, Microsoft Corporation, we are submitting a Zoning Variance
request under the regulations of Division 90-560 of the Village of Mount Pleasant Zoning
Ordinance. The subject property is 791.3 acres, further defined as Tax Parcel ID: 151-03-22-
29-01-001 is located at Section 29, T3N, R22E and Section 30, T3N, R22E, zoned General
Industrial (C-4) and located Tax Increment District No. 151 (TID 151).
The owner is actively pursuing final development approvals to permit a data center use on this
property. This is a permitted use in the C-4 Zoning District and meets the complimentary Land
Use and Economic Development goals, objective and polices defined in the “Multi-
Jurisdictional Comprehensive Plan for Racine County: 2035”, the “Mount-Pleasant-
Wisconsin-Year-2035-Master-Plan” and the “TID 5 -Comprehensive-Plan-of-Redevelopment”
documents. The development plans align with the industrial land use zoning and planned land
use envisioned on site. The existing public infrastructure specifically, water, power, sewer and
transportation, are critical components of the property’s suitability for data center
development. The development plans support the many policies which promote industrial
use, associated diverse employment opportunities, and diversified tax base. The proposed
data center use specifically aligns to Racine County’s EDP goals for targeted business with
“emerging industries”.
Division 90-405 of the Village of Mount Pleasant Zoning Ordinance regulates the lot and
building regulations for architectural standards. Specifically, Section 90-405.30 (b) states:
___________________________
11
MKE Area 2
Zoning Variance - Section 90-405.30
February 17, 2026
For reasons justified below we make the following formal request:
Variance Request - Section 90-405.30 (b)
• Approve a variance to allow no parapets on the data center portion of the building:
o Buildings MKE 07, 08 and 09 facing Durand Avenue
o Buildings MKE 11, 12 and 13 facing Braun Road.
o Buildings MKE 14 & 15 facing Hewitt Memorial Drive
Justification
The applicable standard states: “Architects shall enclose flat roofs with parapets at least
36 inches high.” The project proposes 36-inch parapets at the administration portions of
each building, but no parapet at the data hall portions. The Campus Administration Building
on this campus has also been provided with a 42” parapet.
Parapets over the data hall roof areas are intentionally avoided to reduce the risk of water
intrusion in a climate with significant snow and ice. Parapets on flat roofs typically require
scuppers and downspouts, which add roof-edge penetrations and drainage components
that can become recurring points of leakage and maintenance under freeze/thaw
conditions. The data hall roof areas also do not contain rooftop equipment, so a parapet is
not needed for equipment screening. In addition, a precast concrete sound wall required to
meet the site’s noise ordinance requirements will be constructed along Durand Ave, Braun
Road, and Hewitt Memorial Drive, which will obscure much of the building mass from the
public right-of-way, further reducing the visual impact of omitting parapets at the data hall
portions.
90-560.80 – Review Criteria
Pursuant to § 62.23(7)(e)7, Wis. Stats., a zoning variance may not be approved unless the Zoning
Board of Appeals finds, based on evidence presented by the subject property owner, that:
1. There are conditions unique to the subject property that do not apply generally to other
properties in the district.
• Buildings MKE 07–15 are data center buildings with large data hall roof areas. In this
climate, parapets on flat roofs typically require scuppers and downspouts, which
can be recurring points of water intrusion due to snow/ice accumulation and freeze-
thaw conditions. The need to minimize envelope penetrations and reduce intrusion
risk is a functional requirement for these data hall roof areas and is not common to
typical commercial development.
2. The variance is not contrary to the spirit, purpose, and intent of the regulations of this zoning
chapter and is not contrary to the public interest;
• The intent of requiring 36-inch parapets is generally to provide a finished roof edge
and screen rooftop conditions. This intent is met by providing 36-inch parapets at
the administration portions, which are the most publicly legible components of
12
MKE Area 2
Zoning Variance - Section 90-405.30
February 17, 2026
each building. The data hall roofs have no rooftop equipment, so parapets are not
needed for screening in those areas. Omitting parapets over the data halls improves
long-term roof performance and reduces maintenance and failure risk, which
supports the public interest.
3. Strict compliance with applicable zoning regulations would unreasonably prevent use of the
property for a permitted purpose or would render compliance with the chapter unnecessarily
burdensome;
• Requiring parapets across the entire flat roof area would introduce roof drainage
features (scuppers/downspouts) that increase the likelihood of water intrusion and
long-term maintenance concerns in a snow/ice climate. For a permitted data center
use, reli able building performance is essential; full compliance with the parapet
requirement over the data hall roof areas is not reasonably achievable without
increasing risk to the building envelope.
4. The alleged hardship is created by the terms of the chapter rather than by a person who has
a present interest in the property;
• The hardship results from applying the parapet requirement to a building type with
extensive flat roof data hall areas in a snow/ice climate—not from actions of the
owner/applicant. The roof performance concern is inherent to the building design
and climate conditions.
5. The proposed variance will not create substantial detriment to adjacent property; and
• The requested variance will not create substantial detriment to adjacent properties.
The roof height and overall building massing remain unchanged, and the
administration portions provide the required 36-inch parapet condition.
Additionally, a precast concrete sound wall required for noise ordinance
compliance along Durand Ave, Braun Road, and Hewitt Memorial Drive will obscure
much of the building mass from the public right-of-way, minimizing any visual
impact related to parapets on the data hall portions.
6. The proposed variance will not result in building or development that is incompatible with the
character of the immediate neighborhood.
• The project is consistent with the industrial land use zoning and planned land
use for the area. Allowing no parapets on the data hall roof areas is limited in scope
and does not alter the building use or overall site character. The approach (parapets
at administration portions; no parapets at data hall portions) remains compatible
with an industrial/data center campus setting.
13
MKE Area 2
Zoning Variance - Section 90-405.30
February 17, 2026
We appreciate your consideration of this administrative waiver. Should you have any
questions about the information or request as presented, reach out anytime. We’d be happy
to discuss this further as necessary.
Sincerely,
Aditi Padki, AIA
Associate Architect/Department Manager
Burns and McDonnell
Attachments:
1. Exhibit 01- Typical street facing building elevations
2. Exhibit 02- Site plan (Showing Sound wall location)
erely,
14
Sheet Title/Number
Revisions
DATA CENTER
Package
MKE07-15
9400 Ward Parkway
Kansas City, MO 64114
www.burnsmcd.com
REGISTRATION #: 1308-11
PROPRIETARY - CONFIDENTIAL INFORMATION -
NOT FOR PUBLIC DISTRIBUTION
No. Date Description
Registration
Layout Manager
Civil, Site Survey, Landscaping Technical Lead
Architectural & Structural Technical Lead
Mech, Plumbing & Fire Protection Technical Lead
DESIGN TEAM
MICROSOFT
Building Automation Systems (BAS) Technical Lead
Electrical Technical Lead
Electrical Power Management Systems (EPMS) Technical Lead
Telecommunications / Network Technical Lead
Security Design Manager
Civil Engineering Lead
Structural Engineering Lead
Architectural Lead
Mechanical Engineering Lead
Plumbing Engineering Lead
Fire Protection Engineering Lead
Electrical Engineering Lead
Telecommunications / Network Engineering Lead
Security Systems Engineering Lead
Design Manager
DUANE THOMAS
JORGE GONZALEZ / TRAVIS TEST
SEAN ABBOTT / JOSH MARKS
JEREMY WIKSTROM
LEIANNA BOLEY
BRIAN BURKE
RENATA BOLLICH
DAVID WEEMS / DEWBERRY
ADITI PADKI / BMcD
BINYAM JEMAL / BMcD
JAKE COLBRUNN / BMcD
JOE MIRACLE / BMcD
JASON PHAM / BMcD
CHAD STILWELL / BMcD
JOSE PAYAN / BMcD
BAS Engineering Lead
AMMAR ALKHUWAITER
BILL GEMBINSKI
JUSTIN JACOBSON / Z BETA
SITE SOUND WALL
DIAGRAM
MKE07
12023 Duralnd Avenue
Sturtevant, WI 53177
0 12 DEC 2025 MKE07-15 SITE PLAN IFP
SUBSTATION(SUBSTATION WALL ANDEQUIPMENT BY UTILITY)
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
SS
CHICAGO, MILWAUKEE & ST. PAUL RAILWAY COMPANY
CHICAGO, MILWAUKEE & ST. PAUL RAILWAY COMPANY
BRAUN ROAD
BRAUN ROAD
OLD HIGHWAY 11DURAND AVE.
DURAND AVE.
OLD HIGHWAY 11
S0°30'15"E 2540.19' (CONT.)S0°31'31"E 2465.95' (CONT.)
N83°05'13"E53.95 '
N83°05'13"E 300.00'
N83°05'13"E 2666.85' (CONT.)
N6°54'45"W 360.23'N83°05'41"E18.92'N38°05'15"E56.57'
N30°14'35"E 980.76' (CONT.)
S89°11'16"E71.58'N89°11'16"W71.58'N23°56'25"W 511.40'N23°56'25"W81.18'
N44°59'36"W 80.89'N1°17'34"E 203.21'
N0°31'13"W12.02'
N88°42'26"W 419.29'
N89°02'31"W 969.09'
N89°02'31"W 200.00'
N89°33'57"W 2674.93'
S0°30'15"E 2540.19' (CONT.)S0°30'15"E 2540.19' (CONT.)S0°30'15"E 2540.19'S0°31'31"E 2465.95' (CONT.)S0°31'31"E 2465.95' (CONT.)S0°31'31"E 2465.95' (CONT.)
N83°05'13"E 2666.85' (CONT.)
N83°05'13"E 2666.85' (CONT.)
N83°05'13"E 2666.85' (CONT.)
N30°14'35"E 980.76' (CONT.)
N89°02'31"W 1462.80' (CONT.)
N89°02'31"W 1462.80' (CONT.)
N89°33'57"W 2674.93'
N88°58'46"W 1329.38'
SA706232010759.444SAMH "16350" SAN ST SAN1 STSA706232015749.075SAMH SAN
SA706232034754.213SAMH SAN
SA706232037753.561SAMH "6543" SANSA706232038747.528SAMH "6429" SAN
SA706232040752.252SAMH "6161" SAN
SA706232070752.427SAMH "6897" SAN STSA706232071759.372SAMH "16344" SAN SAN1
SA11759.444SAMH SAN
N89°33'57"W 2674.93'
ELECTRIC POLE LINEEASEMENT DOC. 480137
HEWITT MEMORIAL DRIVE
HEWITT MEMORIAL DRIVE
HEWITT MEMORIAL DRIVE
HEWITT MEMORIAL DRIVE
DURAND AVE
BRAUN ROAD
BRAUN ROAD
N6°54'45"W 360.23'
S0°30'15"E 2540.19' (CONT.)
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
SS
SUBSTATION(SUBSTATION WALL ANDEQUIPMENT BY UTILITY)
oooooo
^^|^^|^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^|^^| ^^| ^^|^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^|^^|^^|^^| ^^| ^^| ^^| ^^| ^^|^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^|^^|^^|^^|^^|^^|^^|^^|^^| ^^| ^^| ^^| ^^| ^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^|^^|^^|^^|^^|^^|^^| oooooooooooooooooooooooooooooooooooo^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^|^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^|
lXλ՛lXλ՛lXλ՛lXλ՛lXλ՛
lllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll
^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^|
lllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll
^^|
^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^|^^| ^^| ^^| ^^|
^^|^^|^^|^^|^^|^^|oooooooooooooooooooooooo
lXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlX
lXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlX ^^|^^|^^|^^|^^|^^|^^|^^|^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^|^^| ^^| ^^| ^^| ^^| ^^|^^| ^^| ^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^| ^^| ^^| ^^| ^^|^^|^^|
lllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll
lll
lll
lll
llllll
lll
oooooo
^^|^^|^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^|^^| ^^| ^^|^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^|^^|^^|^^| ^^| ^^| ^^| ^^| ^^|^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^|^^|^^|^^|^^|^^|^^|^^|^^| ^^| ^^| ^^| ^^| ^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^|^^|^^|^^|^^|^^|^^| oooooooooooooooooooooooooooooooooooo^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^|^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^|
lXλ՛lXλ՛lXλ՛lXλ՛lXλ՛
lllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll
^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^|
lllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll
^^|
^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^|^^| ^^| ^^| ^^|
^^|^^|^^|^^|^^|^^|oooooooooooooooooooooooo
lXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlX
lXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlXlX ^^|^^|^^|^^|^^|^^|^^|^^|^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^| ^^|^^| ^^| ^^| ^^| ^^| ^^|^^| ^^| ^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^|^^| ^^| ^^| ^^| ^^|^^|^^|
lllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll
lll
lll
lll
llllll
lll
KEEP CLEAR
STOP
EMPLOYEE
EXIT
SLOW
KEEP CLEAR
SLOW
KEEP CLEAR
EMPLOYEE
STOPSTOP
SLOWSLOW
STOP
ENTRYSTOPKEEP CLEARENTRYSTOP
SLOW
SLOW
STOP
EXITENTRYSTOP
SLOWKEEP CLEARKEEP CLEARKEEP CLEAR
KEEP CLEAR
SLOW
EMPLOYEE
EMPLOYEEEMPLOYEE
EMPLOYEEVISITORSANDTRUCKS
VISITORSANDTRUCKS
EMPLOYEEEMPLOYEEVISITORSANDTRUCKS
VISITORSANDTRUCKSEXIT
LEFT APPROACHVISIBILITY TRIANGLE
RIGHT APPROACHVISIBILITY TRIANGLE150'150'
POND
POND1-STORYDATA CENTER
POND
POND
POND
PONDPOND
PONDPOND
1-STORYDATA CENTERPROPOSED SITE ACCESS
8' TALL METAL FENCE
64 SPACES
8' TALLMETALFENCE
8' TALL METAL FENCE
8' TALL METAL FENCE8' TALLMETALFENCE
8' TALLMETALFENCE
PROPOSED EMERGENCY/SECONDARY ACCESS
ACCESSROADACCESSROAD
ACCESSROAD
APPROX.LOCATION OFSOUND WALLAPPROX.LOCATION OFSOUND WALL
APPROX.LOCATION OFSOUND WALL
TRANSMISSION EASEMENT
TRANSMISSIONEASEMENT
TRANSMISSIONEASEMENTTRANSMISSIONEASEMENT
TRANSMISSION EASEMENT
TRANSMISSION EASEMENT
TRANSMISSIONEASEMENT
TRANSMISSIONEASEMENT
ACCESSROAD
8' TALL CHAINLINK FENCE
6' TALL CHAINLINK FENCE
FUTURE SUBSTATION ACCESS
PROPOSED EMERGENCY/SECONDARYACCESS 8' TALL METAL FENCE
8' TALL METAL FENCE
8' TALLMETALFENCEACCESSROAD
300' SHORELAND SETBACK300' SHORELAND SETBACK
150' BUILDING SETBACK150' BUILDING SETBACK
20' MIN. BUILDINGSETBACK
20' MIN. BUILDING SETBACK
20' MIN. BUILDING SETBACK
STORM SHELTERS
LOADING DOCK/DUMPSTER PAD
VISIBILITY TRIANGLESGUARD RAIL
64 SPACES
LOADING DOCK/DUMPSTER PAD64 SPACES
LOADING DOCK/DUMPSTER PAD
170 SPACES
5 MOTORCYCLE
ACCESSROAD
8' TALL METAL FENCE
6' TALL CHAINLINK FENCE
8' TALL METAL FENCE
8' TALL METAL FENCE
8' TALL METALFENCE5 MOTORCYCLE
GUARD RAIL
APPROX. LOCATIONOF SOUND WALLAPPROX. LOCATIONOF SOUND WALL
6' TALL CHAINLINK FENCE
LOADING DOCK/DUMPSTER PAD5 MOTORCYCLELOADING DOCK/DUMPSTER PAD
LOADING DOCK/DUMPSTER PAD1-STORYDATA CENTER
1-STORYDATA CENTER
1-STORYDATA CENTER
128 SPACES11 MOTORCYCLEAPPROX.LOCATIONOF SOUNDWALLACCESSROAD8' TALLMETALFENCE
APPROX.LOCATION OFSOUND WALL
STORMSHELTERSSTORMSHELTERS
STORMSHELTERS64 SPACES5 MOTORCYCLESTORMSHELTERS
64 SPACES5 MOTORCYCLESTORMSHELTERS
1-STORYDATA CENTER
1-STORYDATA CENTER
STORMSHELTERS
1-STORYDATA CENTER
1-STORYDATA CENTER
64 SPACESLOADING DOCK/DUMPSTER PAD5 MOTORCYCLESTORMSHELTERS
LOADING DOCK/DUMPSTER PADSTORMSHELTERS
STORM SHELTERS96 SPACES5 MOTORCYCLE
ACCESSROAD
ACCESSROAD
POND
APPROX. LOCATIONOF SOUND WALL
TRANSMISSIONEASEMENT8' TALL METALFENCE
8' TALL METALFENCETRANSMISSION EASEMENT
TRANSMISSIONEASEMENT
APPROX.LOCATION OFSOUND WALL
6' TALL CHAINLINK FENCE8' TALLCHAIN LINKFENCE8' TALLCHAIN LINKFENCE
1-STORYOFFICE
64 SPACESLOADING DOCK/DUMPSTER PAD5 MOTORCYCLE
STACKING SPACES
8' WELDED WIREMESH FENCE8' WELDED WIREMESH FENCE8' WELDED WIREMESH FENCE
TEMPORARY CONSTRUCTIONLAYDOWN AREA
PROP. GUARDHOUSEENTRANCE GATESLOADING DOCK/DUMPSTER PAD330SPACES
10' MULTI-USE PATHWAY
10' MULTI-USE PATHWAY
10' MULTI-USE PATHWAY
330SPACES&STORAGEBLDG
64 SPACES5 MOTORCYCLE5 EV4 ADA(1 EV)4 FLEET5 EV4 ADA(1 EV)4 FLEET24 EV4 FLEET5 EV4 ADA(1 EV)4 FLEET6 EV4 ADA(1 EV)7 ADA9 EV
5 EV5 EV
4 ADA(1 EV)4 ADA(1 EV)
4 ADA(1 EV)5 EV
5 EV
5 EV
4 FLEET4 FLEET
4 FLEET
4 FLEET
4 FLEET
4 ADA(1 EV)
4 ADA(1 EV)
LEGEND
– SOUND WALL LOCATION
– STREET FACING BUILDING
ELEVATION - SHORT SIDE
– STREET FACING BUILDING
ELEVATION - LONG SIDE
EX-02
EX-07
15
LEVEL 01
100' - 0"
TOP OF PRECAST
134' - 9"
5/EX-04
4/EX-04
4/EX-04
3/EX-04
3/EX-04
2/EX-04
3/EX-06
LEVEL 01
100' - 0"
TOP OF PRECAST
134' - 9"
4 23 5
11314 129
8
7
2/EX-06
4/EX-06
LEVEL 01
100' - 0"
TOP OF PRECAST
134' - 9"
4 23 5
11314 12
8
7
3/EX-06
5/EX-06
LEVEL 01
100' - 0"
TOP OF PRECAST
134' - 9"
11314
4 23 5
127
8
4/EX-06
LEVEL 01
100' - 0"
TOP OF PRECAST
134' - 9"
10113
4 23
1
4
8
6
18
11 9
15
9
5
1214
17
16
10 11
8
7
MKE07-15
DATA HALL
ADMIN
Sheet Title/Number
Sector Key Plan
Revisions
DATA CENTER
Package
MKE07-15
9400 Ward Parkway
Kansas City, MO 64114
www.burnsmcd.com
REGISTRATION #: 1308-11
PROPRIETARY - CONFIDENTIAL INFORMATION -
NOT FOR PUBLIC DISTRIBUTION
No. Date Description
Registration
Layout Manager
Civil, Site Survey, Landscaping Technical Lead
Architectural & Structural Technical Lead
Mech, Plumbing & Fire Protection Technical Lead
DESIGN TEAM
MICROSOFT
Building Automation Systems (BAS) Technical Lead
Electrical Technical Lead
Electrical Power Management Systems (EPMS) Technical Lead
Telecommunications / Network Technical Lead
Security Design Manager
Civil Engineering Lead
Structural Engineering Lead
Architectural Lead
Mechanical Engineering Lead
Plumbing Engineering Lead
Fire Protection Engineering Lead
Electrical Engineering Lead
Telecommunications / Network Engineering Lead
Security Systems Engineering Lead
Design Manager
DUANE THOMAS
JORGE GONZALEZ / TRAVIS TEST
SEAN ABBOTT / JOSH MARKS
JEREMY WIKSTROM
LEIANNA BOLEY
BRIAN BURKE
RENATA BOLLICH
DAVID WEEMS / DEWBERRY
ADITI PADKI / BMcD
BINYAM JEMAL / BMcD
JAKE COLBRUNN / BMcD
JOE MIRACLE / BMcD
JASON PHAM / BMcD
CHAD STILWELL / BMcD
JOSE PAYAN / BMcD
BAS Engineering Lead
AMMAR ALKHUWAITER
BILL GEMBINSKI
JUSTIN JACOBSON / Z BETA
EX-01
ARCHITECTURAL
ELEVATION -
STREET FACING
EX-06
MKE07
12023 Duralnd Avenue
Sturtevant, WI 53177
1" = 50'-0"1 OVERALL STREET FACING ELEVATION - LONG SIDE
1/16" = 1'-0"2 ENLARGED STREET FACING ELEVATION - LONG SIDE
1/16" = 1'-0"3 ENLARGED STREET FACING ELEVATION - LONG SIDE
1/16" = 1'-0"4 ENLARGED STREET FACING ELEVATION - LONG SIDE
1/16" = 1'-0"5 ENLARGED STREET FACING ELEVATION - LONG SIDE
0 12 DEC 2025 MKE07-15 SITE PLAN IFP
ELEVATION SHEET NOTES
# MATERIAL
1 INSULATED PRECAST ARCHITECTURAL
CONCRETE PANELS
2 INSULATED METAL PANELS
3 CONCRTE FACED INSULATION PANELS
4 PAINTED HOLLOW METAL DOORS
5 EQUIPMENT ACCESS DOORS
6 PREFINISHED OVERHEAD COILING DOOR
7 PREFINISHED METAL LOUVER, TYPICAL
8 PREFINISHED METAL CANOPY WITH
DOWNSPOUTS
9 PREFINISHED METAL COPING
10 PREFINISHED METAL CONDUCTOR HEAD WITH
DOWNSPOUTS
11 PREFINISHED METAL OVERFLOW
CONDUCTOR HEAD WITH DOWNSPOUTS
12 PREFINISHED METAL GUTTERS WITH
DOWNSPOUTS
13 WHITE THERMOPLASTIC MEMBRANE ROOFING
14 ROOF LIFELINE FALL PROTECTION
15 ROOF ACCESS LADDER AND PLATFORM
16 LADDER ENCLOSURE, ARCHITECTURAL
WELDED WIRE FENCING
17 GALVANIZED STEEL GUARDRAIL
18 LOADING DOCK SEAL
16
LEVEL 01
100' - 0"
TOP OF PRECAST - LOW
131' - 8 1/4"
TOP OF PRECAST - HIGH
136' - 0"
3
5
4
5
4
6
1
1
7
2
1' - 4 3/8"
8
MKE07-15
DATA HALL
ADMIN
Sheet Title/Number
Sector Key Plan
Revisions
DATA CENTER
Package
MKE07-15
9400 Ward Parkway
Kansas City, MO 64114
www.burnsmcd.com
REGISTRATION #: 1308-11
PROPRIETARY - CONFIDENTIAL INFORMATION -
NOT FOR PUBLIC DISTRIBUTION
No. Date Description
Registration
Layout Manager
Civil, Site Survey, Landscaping Technical Lead
Architectural & Structural Technical Lead
Mech, Plumbing & Fire Protection Technical Lead
DESIGN TEAM
MICROSOFT
Building Automation Systems (BAS) Technical Lead
Electrical Technical Lead
Electrical Power Management Systems (EPMS) Technical Lead
Telecommunications / Network Technical Lead
Security Design Manager
Civil Engineering Lead
Structural Engineering Lead
Architectural Lead
Mechanical Engineering Lead
Plumbing Engineering Lead
Fire Protection Engineering Lead
Electrical Engineering Lead
Telecommunications / Network Engineering Lead
Security Systems Engineering Lead
Design Manager
DUANE THOMAS
JORGE GONZALEZ / TRAVIS TEST
SEAN ABBOTT / JOSH MARKS
JEREMY WIKSTROM
LEIANNA BOLEY
BRIAN BURKE
RENATA BOLLICH
DAVID WEEMS / DEWBERRY
ADITI PADKI / BMcD
BINYAM JEMAL / BMcD
JAKE COLBRUNN / BMcD
JOE MIRACLE / BMcD
JASON PHAM / BMcD
CHAD STILWELL / BMcD
JOSE PAYAN / BMcD
BAS Engineering Lead
AMMAR ALKHUWAITER
BILL GEMBINSKI
JUSTIN JACOBSON / Z BETA
EX-01
ARCHITECTURAL
ELEVATION -
STREET FACING
EX-05
MKE07
12023 Duralnd Avenue
Sturtevant, WI 53177
0 12 DEC 2025 MKE07-15 SITE PLAN IFP
1/16" = 1'-0"1 STREET FACING ELEVATION - SHORT SIDE
ELEVATION SHEET NOTES
# MATERIAL
1 INSULATED PRECAST ARCHITECTURAL
CONCRETE PANELS
2 PRECAST PANEL JOINTS
3 PREFINISHED METAL COPING
4 PREFINISHED METAL GUTTERS WITH
DOWNSPOUTS
5 PREFINISHED METAL CANOPY WITH
DOWNSPOUTS
6 ROOF ACCESS LADDER AND PLATFORM
7 LADDER ENCLOSURE, ARCHITECTURAL
WELDED WIRE FENCING
8 TOP OF ROOF BEHIND WALL
17