Common Council Agenda - Amended 10/19/2026 at 3:25 PM
Call To Order
Roll Call
Pledge Of Allegiance
Public Input
Must state name and address. Must be limited to items not on the agenda. Limited
to two minutes per person unless otherwise extended. Public Input is limited to a
total of ten minutes unless otherwise extended. Common Council role is to listen
and not discuss the item. Personnel issues cannot be discussed nor individuals
named. Council is unable to take action at this meeting.
Consent Agenda
Items under the consent agenda may be acted upon by one motion. If, in the judgment of
any council member, a consent agenda item requires discussion, the item can be placed
on the regular agenda for discussion and/or action.
Approval Of Minutes From September 9, 2026
09.09.2026 COMMON COUNCIL MINUTES.PDF
Approve Special Event Permit - Christmas Lights Parade - Saturday, December 12,
2026
12.12.2026 CHRISTMAS LIGHTS PARADE.PDF
Resolution Authorizing Disposal Of 2016 F550 Versalift Boom Truck
RESOLUTION 26-67 AUTHORIZING DISPOSAL OF 2016 F550
VERSALIFT BOOM TRUCK.PDF
Resolution Authorizing Town Of Lodi To Provide Bookkeeping Services To The
Emergency Medical Services Commission
RESOLUTION 26-68 AUTHORIZING TOWN OF LODI TO PROVIDE
BOOKKEEPING SERVICES TO THE EMERGENCY MEDICAL SERVICES
COMMISSION.PDF
Resolution Approving The Primary Terrace Townhouses Condominium Plat (103
Pleasant St)
RESOLUTION 26-69 APPROVING THE PRIMARY TERRACE
TOWNHOUSES CONDOMINIUM PLAT FOR LOT 1 OF CSM NO. 7055 -
103 PLEASANT ST.PDF
Resolution Approving A Certified Survey Map
RESOLUTION 26-77 APPROVING A CSM FOR PARCELS 11246-770.905 AND
11246-770.906.PDF
EXHIBIT A - CSM7087.PDF
EXHIBIT B - NEWCSM.PDF
Resolution Approving Pay Request #3 For S&L Underground For Fair Street Project
RESOLUTION 26-70 APPROVING PAY REQUEST 3 - SL UNDERGROUND -
FAIR STREET PROJECT.PDF
LOD 04 PAY APP 3 MEMO.PDF
LOD 04 PAY APP 3.PDF
LOD 04 DEPARTMENTAL COST BREAKDOWN 3.PDF
Resolution Approving Pay Request #4 And Change Order #1 For S&L Underground For Fair
Street Project
RESOLUTION 26-71 APPROVING PAY REQUEST 4 AND CHANGE ORDER 1
FROM S AND L UNDERGROUND ON THE FAIR STREET PROJECT.PDF
LOD 04 PAY APP 4 MEMO.PDF
LOD 04 PAY APP 4 - SIGNED.PDF
LOD 04 DEPARTMENTAL COST BREAKDOWN 4.PDF
CHANGE ORDER 1 SIGNED - LOD 04.PDF
Resolution Authorizing The Relocation Of The Waste Water Treatment Facility To A New
Site
RESOLUTION 26-72 AUTHORIZING THE RELOCATION OF THE WASTE WATER
TREATMENT FACILITY TO A NEW SITE.PDF
Resolution Authorizing Letter Of Agreement With Mueller Communications
RESOLUTION 26-73 AUTHORIZING LETTER OF AGREEMENT WITH MUELLER
COMMUNICATIONS.PDF
DRAFT LODI REFERENDUM LOA 10.2.2026.PDF
Resolution Approving Proposal For Levy Limit Referendum Planning With Ehlers
RESOLUTION 26-74 APPROVING PROPOSAL FOR LEVY LIMIT REFERENDUM
PLANNING WITH EHLERS.PDF
LODI, WI - PROPOSAL FOR 2027 REFERENDUM PLANNING.PDF
Resolution Amending The City Of Lodi 2026 General Fund Budget
RESOLUTION 26-75 AMENDING THE 2026 GENERAL FUND BUDGET.PDF
Resolution Appointing City Attorney
RESOLUTION 26-76 APPOINTING A CITY ATTORNEY.PDF
Ordinance A-583 To Amend Chapter 322 Vehicles, All-Terrain And Utility-Terrain
ORDINANCE A-583 TO AMEND CHAPTER 322 VEHICLES, ALL-TERRAIN AND
UTILITY-TERRAIN.PDF
Department Status Reports
l Utilities, Streets and Parks Department Status Report
l Police Department Status Report
CHIEF QUAMME MONTHLY REPORT - SEPTEMBER.PDF
Lodi Area EMS Commission Update
Lodi Area Fire Commission Update
Follow Up On Public Input Received At Committee Of The Whole Meeting
Future Agenda Items
Adjourn
Posted:_________________
By:_____________________
Members: Mayor Marx, Alder Crow, Alder Flanagan, Alder Kutz, Alder Heller, Alder Ripp, Alder Stevenson
(President)
Agendas may change up to 24 hours prior to the commencement of the meeting. Reasonable
accommodations for persons with disabilities may be made in advance by calling City Hall at 608 -592-
3247.
PLEASE TAKE NOTICE: There will be a City of Lodi
Common Council meeting Tuesday, October 20, 2026 at
5:30 pm in the City Hall Council Room, 130 South Main
Street, Lodi, WI.
Meeting Link: https://events.gcc.teams.microsoft.com/event/3b86abd6-eebd-4d51-9d37-
c325bc85aca2@b47e60e2-f56b-4da2-a329-4ba078adf6b9?
source=copyLinkOneEventsShareDialog
1.
2.
3.
4.
5.
5.a.
Documents:
5.b.
Documents:
5.c.
Documents:
5.d.
Documents:
5.e.
Documents:
6.
Documents:
7.
Documents:
8.
Documents:
9.
Documents:
10.
Documents:
11.
Documents:
12.
Documents:
13.
Documents:
14.
Documents:
15.
Documents:
16.
17.
18.
19.
20.
Common Council Agenda - Amended 10/19/2026 at 3:25 PM
Call To Order
Roll Call
Pledge Of Allegiance
Public Input
Must state name and address. Must be limited to items not on the agenda. Limited
to two minutes per person unless otherwise extended. Public Input is limited to a
total of ten minutes unless otherwise extended. Common Council role is to listen
and not discuss the item. Personnel issues cannot be discussed nor individuals
named. Council is unable to take action at this meeting.
Consent Agenda
Items under the consent agenda may be acted upon by one motion. If, in the judgment of
any council member, a consent agenda item requires discussion, the item can be placed
on the regular agenda for discussion and/or action.
Approval Of Minutes From September 9, 2026
09.09.2026 COMMON COUNCIL MINUTES.PDF
Approve Special Event Permit - Christmas Lights Parade - Saturday, December 12,
2026
12.12.2026 CHRISTMAS LIGHTS PARADE.PDF
Resolution Authorizing Disposal Of 2016 F550 Versalift Boom Truck
RESOLUTION 26-67 AUTHORIZING DISPOSAL OF 2016 F550
VERSALIFT BOOM TRUCK.PDF
Resolution Authorizing Town Of Lodi To Provide Bookkeeping Services To The
Emergency Medical Services Commission
RESOLUTION 26-68 AUTHORIZING TOWN OF LODI TO PROVIDE
BOOKKEEPING SERVICES TO THE EMERGENCY MEDICAL SERVICES
COMMISSION.PDF
Resolution Approving The Primary Terrace Townhouses Condominium Plat (103
Pleasant St)
RESOLUTION 26-69 APPROVING THE PRIMARY TERRACE
TOWNHOUSES CONDOMINIUM PLAT FOR LOT 1 OF CSM NO. 7055 -
103 PLEASANT ST.PDF
Resolution Approving A Certified Survey Map
RESOLUTION 26-77 APPROVING A CSM FOR PARCELS 11246-770.905 AND
11246-770.906.PDF
EXHIBIT A - CSM7087.PDF
EXHIBIT B - NEWCSM.PDF
Resolution Approving Pay Request #3 For S&L Underground For Fair Street Project
RESOLUTION 26-70 APPROVING PAY REQUEST 3 - SL UNDERGROUND -
FAIR STREET PROJECT.PDF
LOD 04 PAY APP 3 MEMO.PDF
LOD 04 PAY APP 3.PDF
LOD 04 DEPARTMENTAL COST BREAKDOWN 3.PDF
Resolution Approving Pay Request #4 And Change Order #1 For S&L Underground For Fair
Street Project
RESOLUTION 26-71 APPROVING PAY REQUEST 4 AND CHANGE ORDER 1
FROM S AND L UNDERGROUND ON THE FAIR STREET PROJECT.PDF
LOD 04 PAY APP 4 MEMO.PDF
LOD 04 PAY APP 4 - SIGNED.PDF
LOD 04 DEPARTMENTAL COST BREAKDOWN 4.PDF
CHANGE ORDER 1 SIGNED - LOD 04.PDF
Resolution Authorizing The Relocation Of The Waste Water Treatment Facility To A New
Site
RESOLUTION 26-72 AUTHORIZING THE RELOCATION OF THE WASTE WATER
TREATMENT FACILITY TO A NEW SITE.PDF
Resolution Authorizing Letter Of Agreement With Mueller Communications
RESOLUTION 26-73 AUTHORIZING LETTER OF AGREEMENT WITH MUELLER
COMMUNICATIONS.PDF
DRAFT LODI REFERENDUM LOA 10.2.2026.PDF
Resolution Approving Proposal For Levy Limit Referendum Planning With Ehlers
RESOLUTION 26-74 APPROVING PROPOSAL FOR LEVY LIMIT REFERENDUM
PLANNING WITH EHLERS.PDF
LODI, WI - PROPOSAL FOR 2027 REFERENDUM PLANNING.PDF
Resolution Amending The City Of Lodi 2026 General Fund Budget
RESOLUTION 26-75 AMENDING THE 2026 GENERAL FUND BUDGET.PDF
Resolution Appointing City Attorney
RESOLUTION 26-76 APPOINTING A CITY ATTORNEY.PDF
Ordinance A-583 To Amend Chapter 322 Vehicles, All-Terrain And Utility-Terrain
ORDINANCE A-583 TO AMEND CHAPTER 322 VEHICLES, ALL-TERRAIN AND
UTILITY-TERRAIN.PDF
Department Status Reports
l Utilities, Streets and Parks Department Status Report
l Police Department Status Report
CHIEF QUAMME MONTHLY REPORT - SEPTEMBER.PDF
Lodi Area EMS Commission Update
Lodi Area Fire Commission Update
Follow Up On Public Input Received At Committee Of The Whole Meeting
Future Agenda Items
Adjourn
Posted:_________________
By:_____________________
Members: Mayor Marx, Alder Crow, Alder Flanagan, Alder Kutz, Alder Heller, Alder Ripp, Alder Stevenson
(President)
Agendas may change up to 24 hours prior to the commencement of the meeting. Reasonable
accommodations for persons with disabilities may be made in advance by calling City Hall at 608 -592-
3247.
PLEASE TAKE NOTICE: There will be a City of Lodi
Common Council meeting Tuesday, October 20, 2026 at
5:30 pm in the City Hall Council Room, 130 South Main
Street, Lodi, WI.
Meeting Link: https://events.gcc.teams.microsoft.com/event/3b86abd6-eebd-4d51-9d37-
c325bc85aca2@b47e60e2-f56b-4da2-a329-4ba078adf6b9?
source=copyLinkOneEventsShareDialog
1.
2.
3.
4.
5.
5.a.
Documents:
5.b.
Documents:
5.c.
Documents:
5.d.
Documents:
5.e.
Documents:
6.
Documents:
7.
Documents:
8.
Documents:
9.
Documents:
10.
Documents:
11.
Documents:
12.
Documents:
13.
Documents:
14.
Documents:
15.
Documents:
16.
17.
18.
19.
20.
Common Council Agenda - Amended 10/19/2026 at 3:25 PM
Call To Order
Roll Call
Pledge Of Allegiance
Public Input
Must state name and address. Must be limited to items not on the agenda. Limited
to two minutes per person unless otherwise extended. Public Input is limited to a
total of ten minutes unless otherwise extended. Common Council role is to listen
and not discuss the item. Personnel issues cannot be discussed nor individuals
named. Council is unable to take action at this meeting.
Consent Agenda
Items under the consent agenda may be acted upon by one motion. If, in the judgment of
any council member, a consent agenda item requires discussion, the item can be placed
on the regular agenda for discussion and/or action.
Approval Of Minutes From September 9, 2026
09.09.2026 COMMON COUNCIL MINUTES.PDF
Approve Special Event Permit - Christmas Lights Parade - Saturday, December 12,
2026
12.12.2026 CHRISTMAS LIGHTS PARADE.PDF
Resolution Authorizing Disposal Of 2016 F550 Versalift Boom Truck
RESOLUTION 26-67 AUTHORIZING DISPOSAL OF 2016 F550
VERSALIFT BOOM TRUCK.PDF
Resolution Authorizing Town Of Lodi To Provide Bookkeeping Services To The
Emergency Medical Services Commission
RESOLUTION 26-68 AUTHORIZING TOWN OF LODI TO PROVIDE
BOOKKEEPING SERVICES TO THE EMERGENCY MEDICAL SERVICES
COMMISSION.PDF
Resolution Approving The Primary Terrace Townhouses Condominium Plat (103
Pleasant St)
RESOLUTION 26-69 APPROVING THE PRIMARY TERRACE
TOWNHOUSES CONDOMINIUM PLAT FOR LOT 1 OF CSM NO. 7055 -
103 PLEASANT ST.PDF
Resolution Approving A Certified Survey Map
RESOLUTION 26-77 APPROVING A CSM FOR PARCELS 11246-770.905 AND
11246-770.906.PDF
EXHIBIT A - CSM7087.PDF
EXHIBIT B - NEWCSM.PDF
Resolution Approving Pay Request #3 For S&L Underground For Fair Street Project
RESOLUTION 26-70 APPROVING PAY REQUEST 3 - SL UNDERGROUND -
FAIR STREET PROJECT.PDF
LOD 04 PAY APP 3 MEMO.PDF
LOD 04 PAY APP 3.PDF
LOD 04 DEPARTMENTAL COST BREAKDOWN 3.PDF
Resolution Approving Pay Request #4 And Change Order #1 For S&L Underground For Fair
Street Project
RESOLUTION 26-71 APPROVING PAY REQUEST 4 AND CHANGE ORDER 1
FROM S AND L UNDERGROUND ON THE FAIR STREET PROJECT.PDF
LOD 04 PAY APP 4 MEMO.PDF
LOD 04 PAY APP 4 - SIGNED.PDF
LOD 04 DEPARTMENTAL COST BREAKDOWN 4.PDF
CHANGE ORDER 1 SIGNED - LOD 04.PDF
Resolution Authorizing The Relocation Of The Waste Water Treatment Facility To A New
Site
RESOLUTION 26-72 AUTHORIZING THE RELOCATION OF THE WASTE WATER
TREATMENT FACILITY TO A NEW SITE.PDF
Resolution Authorizing Letter Of Agreement With Mueller Communications
RESOLUTION 26-73 AUTHORIZING LETTER OF AGREEMENT WITH MUELLER
COMMUNICATIONS.PDF
DRAFT LODI REFERENDUM LOA 10.2.2026.PDF
Resolution Approving Proposal For Levy Limit Referendum Planning With Ehlers
RESOLUTION 26-74 APPROVING PROPOSAL FOR LEVY LIMIT REFERENDUM
PLANNING WITH EHLERS.PDF
LODI, WI - PROPOSAL FOR 2027 REFERENDUM PLANNING.PDF
Resolution Amending The City Of Lodi 2026 General Fund Budget
RESOLUTION 26-75 AMENDING THE 2026 GENERAL FUND BUDGET.PDF
Resolution Appointing City Attorney
RESOLUTION 26-76 APPOINTING A CITY ATTORNEY.PDF
Ordinance A-583 To Amend Chapter 322 Vehicles, All-Terrain And Utility-Terrain
ORDINANCE A-583 TO AMEND CHAPTER 322 VEHICLES, ALL-TERRAIN AND
UTILITY-TERRAIN.PDF
Department Status Reports
l Utilities, Streets and Parks Department Status Report
l Police Department Status Report
CHIEF QUAMME MONTHLY REPORT - SEPTEMBER.PDF
Lodi Area EMS Commission Update
Lodi Area Fire Commission Update
Follow Up On Public Input Received At Committee Of The Whole Meeting
Future Agenda Items
Adjourn
Posted:_________________
By:_____________________
Members: Mayor Marx, Alder Crow, Alder Flanagan, Alder Kutz, Alder Heller, Alder Ripp, Alder Stevenson
(President)
Agendas may change up to 24 hours prior to the commencement of the meeting. Reasonable
accommodations for persons with disabilities may be made in advance by calling City Hall at 608 -592-
3247.
PLEASE TAKE NOTICE: There will be a City of Lodi
Common Council meeting Tuesday, October 20, 2026 at
5:30 pm in the City Hall Council Room, 130 South Main
Street, Lodi, WI.
Meeting Link: https://events.gcc.teams.microsoft.com/event/3b86abd6-eebd-4d51-9d37-
c325bc85aca2@b47e60e2-f56b-4da2-a329-4ba078adf6b9?
source=copyLinkOneEventsShareDialog
1.
2.
3.
4.
5.
5.a.
Documents:
5.b.
Documents:
5.c.
Documents:
5.d.
Documents:
5.e.
Documents:
6.
Documents:
7.
Documents:
8.
Documents:
9.
Documents:
10.
Documents:
11.
Documents:
12.
Documents:
13.
Documents:
14.
Documents:
15.
Documents:
16.
17.
18.
19.
20.
City of Lodi
Common Council
Minutes of September 9, 202 6
Call to Ord er
Marx cal led the meeting to order a t 5:30 PM.
Roll Call
Co uncil Members Present: Mayor Marx, Alderpersons Crow , Stevenson , Ripp, Kutz, Heller, Flanagan
Staff: Jennifer Sweeney, Arissa Watkins , James Lincoln , Jessica Quamme
Others: Christian Reid , Steve Hefel , Mike Goethel (virtual)
Pledge of Allegiance - The Pledge of Allegiance was recited.
Public Input – Steve Hefel , Columbia County ATV/UTV club , asked the City to reconsider the ATV/UTV times in the
City for 5 am – 10 pm instead of sunrise/sundown . This is the most common time frame in the county. This impacts rural
ATV/UTV use as a detour goes through the City and policy is confusing local riders .
Public Hearing Hwy 60 Special Assessments – Reid reviewed the project and the assessment policy. A final assessment
report is likely to be done around the Fair St. project. The council acknowledged that the hearing notice was sent to all
residents and published in the newspaper for both public hearings .
Public Hearing Fair St Special Assessments – Reid reviewed the project and the assessment policy. A final assessment
report is likely to be done around the end of the project.
Consent Agenda. MOTION ( Stevenson /Ripp ) to approve the consent agenda items including: approval of minutes from
August 18 , 2026 ; Approval of Special Event Permit – Brew-B-Que – Saturday , September 19 , 2026 ; Resolution to
Exempt the City of Lodi From Paying Columbia County Library Tax . Vo ice v ote – all Aye . Motion carried.
Resolution Approving Change Order 1 For The Fair Street Reconstruction Project
Reid reviewed the changes. This is approving a scope of work, not the pay for this project.
MOTION (Stevenson /Kutz ) to approve Resolution Approving Change Order 1 For The Fair Street Reconstruction
Project . Voice vote- All Ayes. Motion carried.
Resolution Approving Change Order 2 For The Fair Street Reconstruction Project
This will be covered under the borrowing, except for potentially the $46,400 for the wall. If the borrowing does not cover
the cost of this wall, money may be sought from the parks development fund. This is approving the scope of work only.
MOTION (Stevenson /Flanagan ) to approve Resolution Approving Change Order 1 For The Fair Street Reconstruction
Project . Voice vote- All Ayes. Motion carried.
Resolution Approving an EMS Financial Request
The EMS costs were not yet broken down for approval to the council , so no report was given . The Town of Lodi is aiding
the EMS with sorting out financials.
Resolution Approving Amendment No. 3 To Long Term Power Supply Contract For Participating Members
This extends the contract by 15 years , allowing for WPPI to do long-term development projects .
MOTION (Crow /Heller ) to approve Resolution 26-62 Approving Amendment No. 3 To Long Term Power Supply
Contract For Participating Members . Roll call vote was taken. Crow- Aye , Flanagan- Aye , Kutz -Aye , Heller- Aye , Ripp-
Aye , Stevenson- Aye . Motion carried.
Resolution Approving a 1-Year Extension For Auditing Services With Wipfli
MOTION (Stevenson /Heller ) to approve Resolution Approving a 1-Year Extension For Auditing Services With Wipfli .
Roll call vote was taken: Heller -Aye , Flanagan- Aye , Stevenson- Aye , Kutz- Aye , Ripp- Aye , Crow- Aye . Motion carried.
Resolution Authorizing The Issuance And Sale Of Up To $242,247 Taxable General Obligation Promissory Notes,
Series 2026e This is for the private lead service laterals. The interest rate is 2.5% .
MOTION (Crow /Stevenson ) to approve Resolution 26-64 Authorizing The Issuance And Sale Of Up To $242,247
Taxable General Obligation Promissory Notes, Series 2026e, And Providing For Other Details And Covenants With
Respect Thereto, And Approval Of Related Financial Assistance Agreement . Roll call vote was taken: Crow- Aye , Ripp-
Aye , Heller- Aye , Stevenson- Aye , Kutz- Aye , Flanagan- Aye . Motion carried.
Department Status Report s
1. Utilities, Streets and Parks Department Status Report – Lincoln presented his report.
2. Police Department – Chief Quamme presented on her month . The Police Department has temporarily moved to
City Hall due to environmental concerns . However, an environmental hygienist is clearing them to move back in
shortly . The staffing issue persists with in the PD. They went through an unsuccessful round of hiring . They may
need to rely on Columbia County to cover vacant shifts. They want to hire at least one more full-time position to
reduce demand on staff and fill shift vacancies.
Lodi Area EMS Commission Update – The audit was not as much of a financial audit but an operational audit with the
commission. They are working on oversight parameters so that they do not run into these budgeting issues once again.
T he commission expects that the number of full-time staff and potential issues with billing for services may contribute to
the EMS ’s shortfall.
Lodi Area Fire Commission Update – The skeeter truck is still not ready and people are not yet trained. The training
truck is still out for repairs. So far, they have had 109 calls this year.
Future Agenda Items – Revisit the ATV/UTV ordinance.
Next Meeting Date – Tuesday, October 20 at 5:30 PM
Adjourn - Motion (Heller /Ripp ) to adjourn. Voice Vote- all Ayes . Motion carried. Meeting adjourn ed a t 6:29 PM .
Minutes by Arissa Watkins, City Clerk
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
INSURER(S) AFFORDING COVERAGE
INSURER F :
INSURER E :
INSURER D :
INSURER C :
INSURER B :
INSURER A :
NAIC #
NAME:
CONTACT
(A/C, No):
FAX
E-MAIL
ADDRESS:
PRODUCER
(A/C, No, Ext):
PHONE
INSURED
REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
OTHER:
(Per accident)
(Ea accident)
$
$
N / A
SUBR
WVD
ADDL
INSD
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
$
$
$
$PROPERTY DAMAGE
BODILY INJURY (Per accident)
BODILY INJURY (Per person)
COMBINED SINGLE LIMIT
AUTOS ONLY
AUTOSAUTOS ONLY
NON-OWNED
SCHEDULEDOWNED
ANY AUTO
AUTOMOBILE LIABILITY
Y / N
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
DESCRIPTION OF OPERATIONS below
If yes, describe under
ANY PROPRIETOR/PARTNER/EXECUTIVE
$
$
$
E.L. DISEASE - POLICY LIMIT
E.L. DISEASE - EA EMPLOYEE
E.L. EACH ACCIDENT
ER
OTH-
STATUTE
PER
LIMITS(MM/DD/YYYY)
POLICY EXP
(MM/DD/YYYY)
POLICY EFF
POLICY NUMBERTYPE OF INSURANCELTR
INSR
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
EXCESS LIAB
UMBRELLA LIAB $EACH OCCURRENCE
$AGGREGATE
$
OCCUR
CLAIMS-MADE
DED RETENTION $
$PRODUCTS - COMP/OP AGG
$GENERAL AGGREGATE
$PERSONAL & ADV INJURY
$MED EXP (Any one person)
$EACH OCCURRENCE
DAMAGE TO RENTED
$PREMISES (Ea occurrence)
COMMERCIAL GENERAL LIABILITY
CLAIMS-MADE OCCUR
GEN'L AGGREGATE LIMIT APPLIES PER:
POLICY PRO-
JECT LOC
CERTIFICATE OF LIABILITY INSURANCE
DATE (MM/DD/YYYY)
CANCELLATION
AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2015 ACORD CORPORATION. All rights reserved.
CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD
HIRED
AUTOS ONLY
RESOLUTION 26- 67
AUTHORIZING DISPOSAL OF 201 6 F550 VERSALIFT BOOM TRUCK
WHEREAS, the City desire s to dispose o f a 2016 F 550 V ersalift B oom T ruck ; and
WHEREAS, section 259-2 of the City Code of Ordinances states that the Common
Council determines if an item over $5,000 in fair market value is surplus property .
NOW, THEREFORE, BE IT RESOLVED , the Common Council of the City of Lodi ,
Wisconsin , hereby determines that the 2016 F 550 V ersalift B oom T ruck is surplus property and
authorizes disposal in accordance with section 259-2 E.(1) of the City ’s Code of Ordinances .
Adopted this 20 th day of October , 20 2 6 by the Common Council of the City of Lodi,
Wisconsin .
___________________________
Thomas Marx , Mayor
Attest: _______________________
Arissa Watkins , City Clerk
RESOLUTION 26- 68
AUTHORIZING THE TOWN OF LODI TO PROVIDE BOOKKEEPING SERVICES TO
THE EMERGENCY MEDICAL SERVICES COMMISSION
WHEREAS , the City of Lodi , is party to an intergovernmental agreement with each the Town of
Lodi and the Town of West Point (jointly, the “ Municipalities ” ) ( “ Agreement ” ) which established the Lodi
Area Medical Services District ( “ District ” ); and
WHEREAS , the Agreement provides for the creation of a commission to govern the emergency
services to be provided under the Agreement ( “ Commission ” ); and
WHEREAS , the Commission is to provide both monthly and annual itemized statements of the
revenues and expenditures of District ( “ Statements ” ) to enable the Municipalities to adopt a budget for the
District; and
WHEREAS, in part because of the departure of the Chief of the EMS, the Commission has found
it difficult to fully and adequately track the revenues and the expenditures of the District so as to prepare
the Statements; and
WHEREAS , the Commission representatives from the Town of Lodi have offered the services of
the Town staff on a temporary basis to assist the Commission in the tracking of the revenues and
expenditures of District.
NOW, THEREFORE, BE IT RESOLVED , that the City Council does hereby agree that for the
period of October 1, 2026, thru December 31, 2027 ( “ Duration ” ), the Town of Lodi staff shall assist the
Commission with the tracking of the revenues and the expenditures of the District and assist in the
preparation of the Statements ( “ Accounting Service ” ).
BE IT FURTHER RESOLVED , that Town of Lodi staff shall assist the Commission with the
conversion of its records presently kept in a Quickbooks format to the Caselle format, and that the Town of
Lodi Board agrees to assume the cost of such a conversion on behalf of the Commission.
BE IT FURTHER RESOLVED , that the Municipalities intend that the Town ’s Accounting
Service shall be of limited to the Duration, and that it shall only be extended upon mutual agreement of all
Municipalities.
BE IT FURTHER RESOLVED , that after the conversion to Caselle, the Commission shall be
responsible for any costs associated with the maintenance of the Caselle software.
A dopted by the C ommon Council of the City of Lodi, Wisconsin, on th is 20 th day of October, 2026.
____________________________________
Thomas Marx, Mayor
Attest: __________________________
Arissa Watkins, City Clerk
RESOLUTION 2 6 -69
APPROVING THE PRIMARY TERRACE TOWNHOUSES
CONDOMINIUM PLAT FOR LOT 1 OF CSM NO. 7055
(103 PLEASANT STREET)
WHEREAS, 103 Pleasant, LLC, as owner of Lot 1 of Certified Survey Map No. 7055, located
at 103 Pleasant Street (Parcel No. 321.01), has presented the Primary Terrace Townhouses
Condominium Plat to the City of Lodi Common Council as prepared by Grothman & Associates,
S.C., a registered land surveyor , to esta blish thirteen townhouse condominium units in five
buildings, together with common elements. The plat is attached hereto and incorporated into this
Resolution as Exhibit A; and
WHEREAS, the subject property is located within the corporate limits and jurisdiction of the
City of Lodi, Wisconsin; and
WHEREAS , the proposed land division has been reviewed for compliance with the applicable
subdivision and zoning regulations of the City of Lodi; and
WHEREAS, the development of Lot 1 was previously reviewed and approved as part of the Top
of Lodi Planned Unit Development, also known as the Primary Terrace Development, through
the approved General Development Plan and Specific Implementation Plan; and
WHEREAS, the condominium plat has been reviewed for compliance with Chapters 300 and
340 of the City Code, Planned Unit Development approvals, and Chapter 703 of the Wisconsin
Statutes; and
WHEREAS, on September 1 st , 2026, the Plan Commission recommended that the City of Lodi
Common Council approve the condominium plat subject to the conditions stated below.
NOW, THEREFORE, BE IT RESOLVED, that the Common Council of the City of Lodi
approves the Primary Terrace Townhouses Condominium Plat for Lot 1 of Certified Survey Map
No. 7055, subject to the following conditions:
1) The final Declaration of Condominium, covenants and restrictions, and related
instruments shall be reviewed and approved by the City Attorney prior to recording. The
documents shall be internally consistent and shall clearly establish that the condominium
association assumes the responsibilities assigned to the owner of Lot 1 under applicable
development-wide easements and agreements.
2) Prior to the City signing the condominium plat, the applicant shall complete any technical
corrections to the condominium plat required by the City Engineer.
3) Prior to issuance of an occupancy permit, the stormwater management improvements
necessary to serve the condominium plat shall be accepted by the City.
4) Following Common Council approval and satisfaction of all conditions, the condominium
plat and associated recordable documents shall be recorded with the Columbia County
Register of Deeds, and recorded copies shall be provided to the City Clerk.
BE IT FURTHER RESOLVED, that, upon satisfaction of the conditions applicable before City
execution, the Mayor and City Clerk are authorized to execute the condominium plat on behalf
of the City of Lodi.
Adopted by the Common Council of the City of Lodi, Wisconsin, this 20 th day of October 202 6 .
CITY OF LODI
________________________ ____ ______
Tom Marx , Mayor
ATTEST:
________________________ _ ___
Arissa Watkins , City Clerk
Page 1 of 1
RESOLUTION 2 6 -77
APPROVING A CERTIFIED SURVEY MAP
FOR PARCEL S 11246-770.90 5 AND 11246-770.906
WHEREAS, Barry Bodendein , as owner of the former Parcel # 770.902 in the City of Lodi, WI ,
has presented a Certified Survey Map to the City of Lodi Common Council as prepared by
Isthmus Surveying, LLC , a registered land surveyor, to divide the existing parcel into two lots
for a zero-lot-line duplex, which map is attached hereto and incorporated into this Resolution as
Exhibit A; and
WHEREAS, the subject property is located within the corporate limits and jurisdiction of the
City of Lodi, Wisconsin; and
WHEREAS , the proposed land division has been reviewed for compliance with the applicable
subdivision and zoning regulations of the City of Lodi; and
WHEREAS , on March 17 , 2026, the City of Lodi Common Council to approve d the Certified
Survey Ma p; and
WHEREAS , the aforementioned survey map of this parcel was off by approximately 6 inches;
and
W HEREAS, a new Certified Survey Map has been presented to the City of Lodi Common
Council as prepared by Isthmus Surveying, LLC, a registered land surveyor, which correctly
maps the division of the two lots into Parcels # 770.905 and 770.906 for the zero-line duplex,
which map is attached hereto and incorporated into this Resolution as Exhibit B.
NOW , THEREFORE , BE IT RESOLVED, that the Common Council of the City of Lodi
approves the proposed Certified Survey Map as recommended by the Plan Commission.
BE IT FURTHER RESOLVED that the Mayor and City Clerk are authorized to execute the
Certified Survey Map on behalf of the City of Lodi.
Adopted by the Common Council of the City of Lodi, Wisconsin, this 20 th day of October 202 6 ,
on a roll call vote: ______ Ayes ______ Nays
CITY OF LODI
________________________ __________
Thomas Marx , Mayor
ATTEST:
_____________________ ____ ___ ____
Arissa Watkins, City Clerk
Exhibit A
PREPARED FOR:
IRON GATE INVESTMENTS LLC
57336 ELI VALLEY ROAD
LOGANVILLE, W 53943
PREPARED BY:
ISTHMUS SURVEYING, LLC
450 NORTH BALDWN STREET
MADISON. WI 53703
(608) 244.1090
www.isthmussurveYing com
isthmussurveying@sbcglobal.net
VOLUME PAGE
LOCATED IN LOT 51, THIRD ADDITION TO RIDGESTONE
VALLEY, lN THE SW+ OF THE SEInNO THE SEJOr rur sr
f, secrtoru 28, T1oN, R8E, clrY oF LoDl, coLUMBIA
COUNTY, WISCONSIN
I
40'
I THIRD ADDITION TO
RlpGESroN-E v4!!EL
9.?
142.80',
This C.S.M. Contains
21 ,465 S. F.
0.49 Acres
uJl
Jl
<lol
uJl
>l
-ltlol
t-
aqqo
oLOtr)r
a=sNst$9?;IooO
z-a
z
oO
orO
LtI ^- tJ.J
Nx-^ io
=PoOooOA
a
JJ 33'
lrI 1 SUNgEI .O-L- -L-----_-:-f l-- nRl\/F
* -""
1 t^,1 t i- . rEs.-q-- i pnur A-$PETZ
:: R.[.S.#',2525:g] 3;:: O soLrDrRoNRoDFouND-12s"Diameter
ffi,BE$i :ik{ffi'tWuU '-z Qt-r e Dr-sIlIc-E:.15:St3?YLt? I:li'
T10N, R8E, Found
Columbia CountY
Aluminum Monument
C;\PROIECTS\2025\2510o8-BODENDEIN LOT51\251008-BODENDEIN-LOT51csm
CERTIFIED SURVEY MAP NO.
BEARINGS ARE REFERENCED TO THE
COLUMBIA COUNTY COORDINATE
SYSTEM, GRID NORTH NAD83(91), THE
souTH LINE OF Sr*or sec.28, T10N, R8E,
BEARS S 89"20'09'E
40' 0'
Easement 12'
i '1" I L:T:! H l- l:":9-r-l*Eas'|o5l''[51
_ , I I -;;l.I=]- ,r ,,-, I
I I $8e"12'46'w) .',
I t ----:-
hl;"'"r:r,- t - la-_
D RIY E
3
*5
_1r!8r3 ___j o- , tsts 13-- --4
south { or Section 28 J ur"ro'on" E 2644 '76' Soutn 1i4 to the sE 1 /4 3::l["#l:ffi"^1, -rt
ol >lFl ulrl
6i ri
Fl ol:l ul 6l
tsl
=i"r IlatUI UI
rt oi
ii "l*t ai
SHEET 1 OF 3
-
TiZt 6'
l-9_+ I_9. I erirtins eratteJ -lI rxIStttIU rtd{rYq _l!3!! E Y d.ltitity ea,-sement O'-i
Lot 2
10,700 s.F.
0.24 Acres
i THIRD ADDII'
I nrocESroNE
lqt:
a4 n'
1 Lot 1 i.,
i i1o,76ssF :I i 0.25 Acres I
--hru'--*ln:
| 12'Easement
ul
(o
i-o
a
ffi
fr[
}[
il
lt
Ir
til
ffi
ilx
ld
IlI
Il[
l|i
ru
ffi
ld
it
ll
li
ii
(N 89'12'.46" E)
N 39'13'03" E
Exhibit B
CERTIFIED SURVEY MAP No. , Volume-, Page.
LOCATED IN LOT 51, THIRD ADDITION TO RIDGESTONE
vALLEy, tN THE swl or rHE sE J nuo rHE sE J or rHe se
{, srcrtou 28, T10N, R8E, clrY oF LoDl, coLUMBIA
COUNTY, WISCONSIN
SURVEYOR'S CERTIFICATE:
l, paul A. Spetz, Professional Land Surveyor for lsthmus Surveying LLC, hereby certify that under the direction of
Barry Bodendein, Authorized representative of IRON GATE INVESTMENTS, LLC, owner of said land, I have
surveyed, divided, and mapped the following described parcel of land:
Lot Fifty-one (51), EXCEpT THE EASTERLY 0.5 FEET THEREOF, Third Addition to Ridgestone Valley, as recorded
in Votume 1 , of ptats on page 260-261as Document Number 728248,located in the SW ] of the SE J and the SE J
of the SE J of Section 2g, T't0N, RgE, City of Lodi, Columbia County, Wisconsin more particularly described as
follows:
commencing at the South J of said Section 28, thence N 89'20'09" E, along the south line of the sw J of the sE ] of
said Section 28, 1268.93 feet;
thence N 00.00'17', W, along a line being the Easterly right-of-way of Dale Drive extended, 623.84 feet to the
southwest platted boundar/corner of saio t-ot sl, Third Addition to Ridgestone Valley, and the point of beginning of
this descriPtion,
thence N 00"01 ,42" W, along the westerly platted boundary line of said Lot 51 and the easterly right-of-way line of
Dale Drive, 150.07 feet;
thence N 89"'l 3'03" E, along the northerly platted boundary line of said Lot 51 , 142.80 feel
thence s 00" 10,21" E, 1 50.ig feet to a point orr the southerly platted boundary line of said Lot 51 , and on the
northerly right-of-way line of Sunset Drive;
thence S gg.15,49,'W, along the southerly platted boundary line of said Lot 51 and northerly right-of-way line of
Sunset Drive, 143.1 8 feet to the point of beginning'
The lands in this Certified Survey Map contain 21,465 Square Feet or 0'49 acres'
I further certify that the map on sheet one (1) is a correct representatton of the exterior boundaries of the land
surveyed ,nd the division of that land, and that I have fully complied with the provisions of chapter 236.34 of the
wisconsin state statutes and the city of Lodi ordinances, in surveying, dividing, and mapping the same.
Dated this //fr day of
Signed: PaulA. Spe2, Wisconsin P.L.S 2525
C:\PROJECTS\2025\251008 BODENDEIN-LOT51\251008-BODENDEIN LOT5IcS
SHEET 2 OF 3
CERTIFIED SURVEY MAP No._, Volume_, Page.
LOCATED IN LOT 51, THIRD ADDITION TO RIDGESTONE
vALLEy, rN THE sw] or rHE sElnNo rHE sEJor rue sr
1, srcrtou 28, T'10N, RBE, ctrY oF LoDl, coLUMBIA
COUNTY, WISCONSIN
OWNER'S CERTIFICATE
I, Barry Bodendein, authorized representative of IRON GATE INVESTMENTS LLC, owners, do hereby
certify that I caused the land described on this certified survey map to be surveyed, divided, mapped
and dedicated as represented on this certified survey map. I also certify that this certified survey map is
required by S. 236.34 of the Wisconsin State Statutes and City of Lodi Ordinances, to be submitted to
the City of Lodi Plan Commission, for approval. ,
witness the hand and seal of said owner tnis |
(?
o ,, o, 1C\ob n ,,0,u
Authorized Rep. IRON GATE INVESTMENTS LLC
State of Wisconsin )
/'\ )ss
county ot l.l)Uf--t )
personaly came before netnis / hry o, CfiiW2O2;,theabove named
Barry Bodendein, authorized representative of IRON GATE INVESTIMENTS LLC, to me
the foregoing instrument and acknowledged the same
KR,st) u. D*ePrut
My commission expires:
ft$ :'!::h
= -< J. lzE
''{E;,:rff
RESOLVED that this certified survey map in the City of Lodi, Columbia County, Wisconsin is hereby approved by the
Common Council.
Dated this
-,
day of ,2026
----layorT$ of Lodi
I HEREBY cERTlFy that the foregoing is a copy of a Resolution adopted by the common council of the city of Lodi, wisconsin
on the ---, of 2026
eETldr- Daie:---
C: \PROJECTS\202 5\25 1008-BOOENDEIN-LOT5 1\2 51008-BODENDEIN-LOT5 lcsm dwg
SHEET 3 OF 3
Notary Public, of
.!
_L.
RESOLUTION 2 6 -70
RESOLUTION APPROVING PAY REQUEST # 3 FROM S&L UNDERGROUND
FOR WORK COMPLETED ON THE FAIR STREET PROJECT
WHEREAS, the City of Lodi has contracted S&L Underground to complete the Fair
Street Project; and
WHEREAS, a Request for Payment # 3 was received from S&L Underground ; and
WHEREAS, the engineer from Town and Country Engineering has reviewed and
approved Pay Request # 3 .
NOW, THEREFORE, BE IT RESOLVED that the City of Lodi Common Council
hereby approves the Request for Payment # 3 ($ 674,069.02 ) to S& L Underground .
Adopted by the Common Council of the City of Lodi, Wisconsin, on this 20 th day of
October , 20 2 6 .
____________________________________
T homas Marx , Mayor
Attest: __________________________
Arissa Watkins , City Clerk
Madison ⧫ Rhinelander ⧫ Kenosha ⧫ Platteville
6264 Nesbitt Road • Madison, WI 53719 • (608) 273-3350 • tce@tcengineers.net
MEMORANDUM
To: Jennifer Sweeney, City Administrator, City of Lodi
From: Chrisitan Reid, Project Engineer, Town & Country Engineering
Date: 8/27/2026
Subject: 2026 Street and Utility Improvements - Fair Street – Pay Request # 3
Review and Recommendation for Approval
Jennifer,
I have reviewed the complete d submittal for Pay Request No. 3 for the 2026 Street and Utility
Improvements Fair Street Project as submitted by S&L Underground . Based on the
documentation provided and on-site progress observations, I recommend the approval of the pay
request for $674,069.02.
As previously discussed, Payment Application #1 included payment for materials purchased and
stored for the project of $41,254.63, minus retainage for a payment of $39,191.90 ($21,930.73
for water, $17,261.17 for sewer). The stored materials were reduced in payment application # 2
and have been zeroed out as of this payment application (#3). This means that all prepayments
for the materials have been credited back as of this current pay request.
The work completed to date aligns with the quantities and unit prices in the contract documents,
and I have verified the billing accuracy against field observations.
Based on the associated project components for this period and the agreed upon method for
assigning costs, the total costs are split as follows:
Water: $27,093.35
Sanitary Sewer: $524,260.74
Storm Sewer: $0.00
Remaining (Street): $122,714.93
Township: $0.00
Sincerely,
TOWN & COUNTRY ENGINEERING, INC.
Christian Reid, P.E.
Project Engineer
City of Lodi
Town & Country Engineering, Inc. Engineer's Project No.: LOD 04
S & L Underground, Inc. Contractor's Project No.:
Application Date: 8/27/2026
From 7/22/2026 to 8/27/2026
1. 2,900,549.90$
2. -$
3. 2,900,549.90$
4. 832,366.05$
5.
a. 5.0% X $832,366.05 41,618.30$
b. 5.0% X $ - -$
c. 41,618.30$
6. 790,747.75$
7. 116,678.73$
8. 674,069.02$
9. 2,109,802.15$
Date:
By:
Title:
Date:
By:
Title:
Date:Date:
Approved by Funding Agency
By:
Title:
By: Christian Reid, P.E.
Title: Project Engineer
Date: 8/27/2026
Recommended by Engineer Approved by Owner
Amount due this application
Balance to finish, including retainage (Line 3 - Line 6)
Contractor's Certification
The undersigned Contractor certifies, to the best of its knowledge, the following:
(1) All previous progress payments received from Owner on account of Work done under the Contract have been
applied on account to discharge Contractor's legitimate obligations incurred in connection with the Work covered by
prior Applications for Payment;
(2) Title to all Work, materials and equipment incorporated in said Work, or otherwise listed in or covered by this
Application for Payment, will pass to Owner at time of payment free and clear of all liens, security interests, and
encumbrances (except such as are covered by a bond acceptable to Owner indemnifying Owner against any such liens,
security interest, or encumbrances); and
(3) All the Work covered by this Application for Payment is in accordance with the Contract Documents and is not
defective.
Contractor:
Signature:
Less previous payments (Line 6 from prior application)
Original Contract Price
Net change by Change Orders
Current Contract Price (Line 1 + Line 2)
Total Work completed and materials stored to date
Retainage
Stored Materials
Work Completed
Total Retainage (Line 5.a + Line 5.b)
Amount eligible to date (Line 4 - Line 5.c)
Application No.: 3
Application Period:
Contractor's Application for Payment
Owner:
Engineer:
Contractor:
Project:
Owner's Project No.:
2026 Street & Utility Improvements – Fair Street
Progress Estimate - Unit Price Work
Owner: Owner's Project No.
Engineer: Engineer's Project No.
Contractor: Contractor's Project No.
Project:
Application No.: 3 From 7/22/2026 to 8/27/2026 8/27/2026
A B C D E F G H J K L
Description Item Qty. Units Unit Price
($)
Value of Bid
Item
(C X E) ($)
Qty. Value ($) Estimated
Quantity
Incorporated
in the Work
Value of Work
Completed to
Date
(E X G) ($)
0
BASE BID - Water
1 10" PVC Water Main 564 lin. ft. $ 100.00 $ 56,400.00 - $ - - $ - $ - 0% $ 56,400.00
2 8" PVC Water Main 1,720 lin. ft. $ 61.50 $ 105,780.00 - $ - 568.00 $ 34,932.00 $ 34,932.00 33% $ 70,848.00
3 6" PVC Water Main and Hydrant Leads 176 lin. ft. $ 64.50 $ 11,352.00 24.00 $ 1,548.00 24.00 $ 1,548.00 $ 1,548.00 14% $ 9,804.00
4 10" Gate Valves and Boxes 4 each $ 4,616.00 $ 18,464.00 - $ - - $ - $ - 0% $ 18,464.00
5 8" Gate Valves and Boxes 12 each $ 3,338.00 $ 40,056.00 - $ - 3.00 $ 10,014.00 $ 10,014.00 25% $ 30,042.00
6 6" Gate Valves and Boxes 6 each $ 2,543.00 $ 15,258.00 1.00 $ 2,543.00 2.00 $ 5,086.00 $ 5,086.00 33% $ 10,172.00
7 Hydrants 6 each $ 6,432.00 $ 38,592.00 - $ - 1.00 $ 6,432.00 $ 6,432.00 17% $ 32,160.00
8 1" Corporation Stops 13 each $ 777.00 $ 10,101.00 - $ - - $ - $ - 0% $ 10,101.00
9 1" Curb Stops 13 each $ 708.40 $ 9,209.20 - $ - - $ - $ - 0% $ 9,209.20
10 1" HDPE Water Service 500 lin. ft. $ 48.40 $ 24,200.00 - $ - - $ - $ - 0% $ 24,200.00
11 Existing Lateral Reconnections 13 each $ 1,156.00 $ 15,028.00 - $ - - $ - $ - 0% $ 15,028.00
12 Existing Main Reconnection 6 each $ 7,850.80 $ 47,104.80 - $ - - $ - $ - 0% $ 47,104.80
BASE BID - Sewer
13 24" PVC SDR 35 Sanitary Sewer 455 lin. ft. $ 178.10 $ 81,035.50 - $ - - $ - $ - 0% $ 81,035.50
14 24" PVC SDR 26 Sanitary Sewer 1,400 lin. ft. $ 260.00 $ 364,000.00 1,383.00 $ 359,580.00 1,383.00 $ 359,580.00 $ 359,580.00 99% $ 4,420.00
15 8" PVC SDR 35 Sanitary Sewer 80 lin. ft. $ 112.60 $ 9,008.00 6.00 $ 675.60 6.00 $ 675.60 $ 675.60 8% $ 8,332.40
16 10" PVC SDR 35 Sanitary Sewer 10 lin. ft. $ 239.00 $ 2,390.00 4.00 $ 956.00 4.00 $ 956.00 $ 956.00 40% $ 1,434.00
17 Sanitary Manhole Castings 12 each $ 912.00 $ 10,944.00 - $ - - $ - $ - 0% $ 10,944.00
18 48" Drop Manhole Masonry 11 vert. ft. $ 700.00 $ 7,700.00 18.00 $ 12,600.00 18.00 $ 12,600.00 $ 12,600.00 164% $ (4,900.00)
19 60" Drop Manhole Masonry 11 vert. ft. $ 700.00 $ 7,700.00 9.00 $ 6,300.00 9.00 $ 6,300.00 $ 6,300.00 82% $ 1,400.00
20 48” Standard Sanitary Manhole Masonry 112 vert. ft. $ 352.00 $ 39,424.00 61.38 $ 21,605.76 61.38 $ 21,605.76 $ 21,605.76 55% $ 17,818.24
21 60" Standard Sanitary Manhole Masonry 54 vert. ft. $ 1,350.00 $ 72,900.00 49.06 $ 66,231.00 49.06 $ 66,231.00 $ 66,231.00 91% $ 6,669.00
22 24" x 6" Sanitary Sewer Wyes 11 each $ 5,150.00 $ 56,650.00 5.00 $ 25,750.00 5.00 $ 25,750.00 $ 25,750.00 45% $ 30,900.00
23 6" PVC Sanitary Laterals 250 lin. ft. $ 136.80 $ 34,200.00 155.00 $ 21,204.00 155.00 $ 21,204.00 $ 21,204.00 62% $ 12,996.00
24 Sanitary Tracer Wire Boxes 11 each $ 401.00 $ 4,411.00 5.00 $ 2,005.00 5.00 $ 2,005.00 $ 2,005.00 45% $ 2,406.00
BASE BID - Storm
25 12" CL IV RCP Storm Sewer 80 lin. ft. $ 80.15 $ 6,412.00 - $ - - $ - $ - 0% $ 6,412.00
26 18" CL III RCP Storm Sewer 45 lin. ft. $ 180.00 $ 8,100.00 - $ - - $ - $ - 0% $ 8,100.00
26A 15" CL IV RCP Storm Sewer 38 lin. ft. $ 93.90 $ 3,568.20 - $ - - $ - $ - 0% $ 3,568.20
26B 24" CL III RCP Storm Sewer 10 lin. ft. $ 142.50 $ 1,425.00 - $ - - $ - $ - 0% $ 1,425.00
27 30" CL III RCP Storm Sewer 100 lin. ft. $ 136.10 $ 13,610.00 - $ - - $ - $ - 0% $ 13,610.00
28 24" x 36" Storm Sewer Rectangular Catch
Basins with Castings
8 each $ 3,912.00 $ 31,296.00 - $ - - $ - $ - 0% $ 31,296.00
29 5' Storm Sewer Manhole Inlet with
Casting
4 each $ 6,696.00 $ 26,784.00 - $ - - $ - $ - 0% $ 26,784.00
30 15" Concrete Endwall 2 each $ 2,020.00 $ 4,040.00 - $ - - $ - $ - 0% $ 4,040.00
BASE BID - Street
31 Erosion Control 1 lump sum $ 8,960.00 $ 8,960.00 - $ - 1.00 $ 8,960.00 $ 8,960.00 100% $ -
32 Traffic Control 1 lump sum $ 17,008.00 $ 17,008.00 0.25 $ 4,252.00 0.75 $ 12,756.00 $ 12,756.00 75% $ 4,252.00
33 Excavation/ Fill to Subgrade 1 lump sum $ 432,331.00 $ 432,331.00 0.25 $ 108,082.75 0.25 $ 108,082.75 $ 108,082.75 25% $ 324,248.25
34 Excavation and Disposal of Bad Subbase
Below Subgrade
1,850 cu. yds. $ 20.00 $ 37,000.00 616.93 $ 12,338.60 616.93 $ 12,338.60 $ 12,338.60 33% $ 24,661.40
Original Contract
Bid Item
No.
Contract Information This Period Work Completed Work
Completed and
Materials
Stored to Date
(H) ($)
% of
Value of
Item
(J / F)
(%)
Balance to Finish
(F - J)
($)
Application Date:
Contractor's Application for Payment
City of Lodi
Town & Country Engineering, Inc. LOD 04
S & L Underground, Inc.
2026 Street & Utility Improvements – Fair Street
Page 1 of 3
Description Item Qty. Units Unit Price
($)
Value of Bid
Item
(C X E) ($)
Qty. Value ($) Estimated
Quantity
Incorporated
in the Work
Value of Work
Completed to
Date
(E X G) ($)
Bid Item
No.
Contract Information This Period Work Completed Work
Completed and
Materials
Stored to Date
(H) ($)
% of
Value of
Item
(J / F)
(%)
Balance to Finish
(F - J)
($)
35 3" Breaker Run and Replacement of
Excavation of Bad Subbase Below
Subgrade
10,100 tons $ 14.00 $ 141,400.00 1,866.06 $ 26,124.84 1,866.06 $ 26,124.84 $ 26,124.84 18% $ 115,275.16
36 ¾" Crushed Aggregate Base Course 6,000 tons $ 15.50 $ 93,000.00 504.00 $ 7,812.00 504.00 $ 7,812.00 $ 7,812.00 8% $ 85,188.00
37 Sawcutting Existing Concrete and Asphalt
Pavements
200 lin. ft. $ 3.00 $ 600.00 - $ - - $ - $ - 0% $ 600.00
38 30" Concrete Curb & Gutter 4,250 lin. ft. $ 20.35 $ 86,487.50 - $ - - $ - $ - 0% $ 86,487.50
39 6" Thick Concrete Sidewalk and Driveway
Approaches
1,650 sq. ft. $ 6.06 $ 9,999.00 - $ - - $ - $ - 0% $ 9,999.00
40 4" Thick Concrete Sidewalk 7,500 sq. ft. $ 5.56 $ 41,700.00 - $ - - $ - $ - 0% $ 41,700.00
41 6' Wide Concrete Step with Handrail 125 tread ft. $ 144.00 $ 18,000.00 - $ - - $ - $ - 0% $ 18,000.00
42 Truncated Dome Panels 100 sq. ft. $ 45.45 $ 4,545.00 - $ - - $ - $ - 0% $ 4,545.00
43 Topsoil Restoration, Seeding, Fertilizing &
Mulching
9,800 sq. yds. $ 5.50 $ 53,900.00 - $ - - $ - $ - 0% $ 53,900.00
44 2" Hot-Mix Asphalt Surface Course, Type 5
LT
1,400 tons $ 73.23 $ 102,522.00 - $ - - $ - $ - 0% $ 102,522.00
45 2" Hot-Mix Asphalt Lower Course, Type 4
LT
1,400 tons $ 71.72 $ 100,408.00 - $ - - $ - $ - 0% $ 100,408.00
46 Clean & Tack 11,050 sq. yds. $ 0.16 $ 1,768.00 - $ - - $ - $ - 0% $ 1,768.00
47 2" Hot-Mix Asphalt Paving and Driveways 450 sq. yds. $ 19.19 $ 8,635.50 - $ - - $ - $ - 0% $ 8,635.50
48 Segmental Block Retaining Wall 750 face ft. $ 65.00 $ 48,750.00 - $ - - $ - $ - 0% $ 48,750.00
49 Excavation and Fill at Restroom Wall 1 lump sum $ 11,250.00 $ 11,250.00 - $ - - $ - $ - 0% $ 11,250.00
50 Pavement Marking 1 lump sum $ 5,675.00 $ 5,675.00 - $ - - $ - $ - 0% $ 5,675.00
51 Gravel Shoulder 525 lin. ft. $ 1.90 $ 997.50 - $ - - $ - $ - 0% $ 997.50
BASE BID - Parking Lot
52 Site Grading 1 lump sum $ 32,922.00 $ 32,922.00 0.50 $ 16,461.00 0.50 $ 16,461.00 $ 16,461.00 50% $ 16,461.00
53 Excavation and Disposal of Bad Subbase
Below Subgrade
500 cu. yds. $ 22.60 $ 11,300.00 - $ - - $ - $ - 0% $ 11,300.00
54 3" Breaker Run and Replacement of
Excavation of Bad Subbase Below
Subgrade
1,400 tons $ 14.00 $ 19,600.00 - $ - - $ - $ - 0% $ 19,600.00
55 ¾" Crushed Aggregate Base Course 1,275 tons $ 15.20 $ 19,380.00 - $ - - $ - $ - 0% $ 19,380.00
56 3" Hot-Mix Asphalt Surface Course, Type 4
LT
550 tons $ 80.81 $ 44,445.50 - $ - - $ - $ - 0% $ 44,445.50
57 Mobilization/Bonds/Insurance 1 lump sum $ 35,093.00 $ 35,093.00 0.50 $ 17,546.50 0.50 $ 17,546.50 $ 17,546.50 50% $ 17,546.50
BASE BID - Township Roadway
Page 2 of 3
Description Item Qty. Units Unit Price
($)
Value of Bid
Item
(C X E) ($)
Qty. Value ($) Estimated
Quantity
Incorporated
in the Work
Value of Work
Completed to
Date
(E X G) ($)
Bid Item
No.
Contract Information This Period Work Completed Work
Completed and
Materials
Stored to Date
(H) ($)
% of
Value of
Item
(J / F)
(%)
Balance to Finish
(F - J)
($)
58 Performance & Payment Bonds 1 lump sum $ 1,437.00 $ 1,437.00 - $ - - $ - $ - 0% $ 1,437.00
59 Mobilization 1 lump sum $ 2,940.00 $ 2,940.00 - $ - - $ - $ - 0% $ 2,940.00
60 Traffic Control & Signage 1 lump sum $ 200.00 $ 200.00 - $ - - $ - $ - 0% $ 200.00
61 Excavation Below Subgrade (Excavation
Only)
400 cu. yds. $ 19.60 $ 7,840.00 - $ - - $ - $ - 0% $ 7,840.00
62 Base Aggregate Dense - EBS Replacement
(3" Breaker Run)
840 tons $ 13.30 $ 11,172.00 - $ - - $ - $ - 0% $ 11,172.00
63 Finish Grading In Preparation of Paving 3,870 sq. yds. $ 1.30 $ 5,031.00 - $ - - $ - $ - 0% $ 5,031.00
64 Seal Finished Pavement 3,870 sq. yds. $ 3.68 $ 14,241.60 - $ - - $ - $ - 0% $ 14,241.60
65 HMA Pavement, Upper Layer 2" thickness
(5 LT 58-28 S)
460 tons $ 71.11 $ 32,710.60 - $ - - $ - $ - 0% $ 32,710.60
66 HMA Pavement, Lower Layer 2" thickness
(4 LT 58-28 S)
460 tons $ 69.19 $ 31,827.40 - $ - - $ - $ - 0% $ 31,827.40
67 HMA Pavement, 5 LT 58-28 S - 2"
(Driveways)
200 tons $ 121.21 $ 24,242.00 - $ - - $ - $ - 0% $ 24,242.00
68 Clean and Sweep Asphalt 3,870 sq. yds. $ 0.20 $ 774.00 - $ - - $ - $ - 0% $ 774.00
69 Asphalt Tack Coat 3,870 sq. yds. $ 0.16 $ 619.20 - $ - - $ - $ - 0% $ 619.20
70 Base Aggregate Dense - 3/4" Aggregate
(Shoulders)
200 tons $ 16.30 $ 3,260.00 - $ - - $ - $ - 0% $ 3,260.00
71 Compact & Shape Shoulder Material 3,050 lin. ft. $ 0.97 $ 2,958.50 - $ - - $ - $ - 0% $ 2,958.50
72 Base Aggregate Dense - 3/4" (Driveways) 60 tons $ 29.00 $ 1,740.00 - $ - - $ - $ - 0% $ 1,740.00
73 Pulverize & Relay Asphalt Pavement 3,870 sq. yds. $ 2.00 $ 7,740.00 $ - - $ - $ - 0% $ 7,740.00
74 Remove Existing Storm Sewer Pipe 108 lin. ft. $ 23.00 $ 2,484.00 - $ - - $ - $ - 0% $ 2,484.00
75 18" CMP Storm Sewer Pipe 39 lin. ft. $ 67.60 $ 2,636.40 - $ - - $ - $ - 0% $ 2,636.40
76 18" Metal End Section 2 each $ 495.00 $ 990.00 - $ - - $ - $ - 0% $ 990.00
77 21" x 15" CMP Storm Sewer Pipe 28 lin. ft. $ 73.00 $ 2,044.00 - $ - - $ - $ - 0% $ 2,044.00
78 21" x 15" Metal End Section 1 each $ 486.00 $ 486.00 - $ - - $ - $ - 0% $ 486.00
79 21" CMP Storm Sewer Pipe 45 lin. ft. $ 73.00 $ 3,285.00 - $ - - $ - $ - 0% $ 3,285.00
80 21" Metal End Section 2 each $ 516.00 $ 1,032.00 - $ - - $ - $ - 0% $ 1,032.00
81 Sawcut Pavement 420 lin. ft. $ 3.00 $ 1,260.00 - $ - - $ - $ - 0% $ 1,260.00
ALTERNATE BID NO. 1 - ASPHALT PATH -
A1-1 Segmental Block Retaining Wall 850 face ft. $ 65.00 $ 55,250.00 - $ - - $ - $ - 0% $ 55,250.00
A1-2 8' Wide Asphalt Path 400 sq. yds. $ 17.30 $ 6,920.00 - $ - - $ - $ - 0% $ 6,920.00
A1-3 ¾" Crushed Aggregate Base Course 150 tons $ 25.50 $ 3,825.00 - $ - - $ - $ - 0% $ 3,825.00
ALTERNATE BID NO. 2 - ASSESSIBLE VIEWING AREAS
A2-1 Accessible Viewing Area # 1 1 lump sum $ 10,000.00 $ 10,000.00 - $ - - $ - $ - 0% $ 10,000.00
A2-2 Accessible Viewing Area # 2 1 lump sum $ 10,000.00 $ 10,000.00 - $ - - $ - $ - 0% $ 10,000.00
SUPPLEMENTAL BID ITEMS
S1. Removal of Unsuitable Trench Backfill 2,500 cu. yds. in
trench
$ 20.00 $ 50,000.00 1,002.00 $ 20,040.00 1,002.00 $ 20,040.00 $ 20,040.00 40% $ 29,960.00
S2. Dewatering 4,750 trench ft. $ 0.01 $ 47.50 - $ - - $ - $ - 0% $ 47.50
S3. Property Corner Replacement 26 each $ 50.00 $ 1,300.00 - $ - - $ - $ - 0% $ 1,300.00
S4. Abandon Existing Sanitary Sewer Main 300 lin. ft. $ 6.70 $ 2,010.00 - $ - - $ - $ - 0% $ 2,010.00
S5. Abandon Existing Sanitary Manhole 1 each $ 732.00 $ 732.00 - $ - - $ - $ - 0% $ 732.00
S6. Sanitary Sewer Cleanout 1 lump sum $ 1,170.00 $ 1,170.00 - $ - - $ - $ - 0% $ 1,170.00
S7. 4" Tall Split Rail Fence 120 lin. ft. $ 35.00 $ 4,200.00 - $ - - $ - $ - 0% $ 4,200.00
S8. Temporary Sewer Bypassing 1 lump sum $ 27,325.00 $ 27,325.00 0.25 $ 6,831.25 1.00 $ 27,325.00 $ 27,325.00 100% $ -
Original Contract Totals 2,900,549.90$ 740,487.30$ 832,366.05$ 832,366.05$ 29% 2,068,183.85$
0 0 - - $ - $ - $ - - $ - $ - $ -
0 0 - - $ - $ - $ - - $ - $ - $ -
0 0 - - $ - $ - $ - - $ - $ - $ -
Change Order Totals -$ -$ -$ -$
Project Totals 2,900,549.90$ 832,366.05$ 832,366.05$ 29% 2,068,183.85$
Change Orders
Original Contract and Change Orders
Page 3 of 3
Owner:
Engineer: LOD 04
Contractor:
Project:
Application No.: 3
Application
Period: From 07/22/26 to 08/27/26 08/27/26
A B C D E F G H I J K L M
Previous
Amount Stored
($)
Amount
Stored this
Period
($)
Amount Stored
to Date (G+H)
($)
Amount Previously
Incorporated in
the Work
($)
Amount
Incorporated in
the Work this
Period
($)
Total Amount
Incorporated in
the Work
(J+K)
($)
2 4682192 Util #1 8" PVC C900 (Water) S&L 1 23,084.98 23,084.98 5,771.25 17,313.73 23,084.98 -
13 4682192 Util #1 24" PVC SDR 35
(Sewer) S&L 1 18,169.65 18,169.65 4,542.41 13,627.24 18,169.65 -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
-$ 41,254.63$ 41,254.63$ 10,313.66$ 30,940.96$ 41,254.63$ -$
Note: this is the last pay request with stored materials
Application Date:
Totals
Item No.
(Lump Sum Tab)
or Bid Item No.
(Unit Price Tab)
Supplier
Invoice No.
Submittal No.
(with
Specification
Section No.)
Description of
Materials or
Equipment Stored
Storage
Location
Application No.
When Materials
Placed in Storage
Materials Stored Incorporated in Work
Materials
Remaining in
Storage
(I-L)
($)
Stored Materials Summary Contractor's Application for Payment
City of Lodi Owner's Project No.:
Town & Country Engineering, Inc. Engineer's Project No.:
S & L Underground, Inc. Contractor's Project No.:
2026 Street & Utility Improvements – Fair Street
Progress Estimate - Unit Price Work
Owner: Owner's Project No.
Engineer: Engineer's Project No.
Contractor: Contractor's Project No.
Project:
Application No.: 2 From 7/22/2026 to 8/27/2026 8/27/2026
A B C D E F G H J K L
Description Item Qty. Units Unit Price
($)
Value of Bid Item
(C X E) ($)
Qty. Value ($) Estimated
Quantity
Incorporated
in the Work
Value of Work
Completed to
Date
(E X G) ($)
Water % Water Cost Sanitary % Sanitary Cost Storm % Storm Cost Street % Street Cost Township Cost
BASE BID - Water
1 10" PVC Water Main 564 lin. ft. $ 100.00 $ 56,400.00 - $ - - $ - $ - 0% $ 56,400.00 - 100% $0.00 0% $0.00 0% $0.00 0% $0.00 $0.00
2 8" PVC Water Main 1,720 lin. ft. $ 61.50 $ 105,780.00 - $ - 568.00 $ 34,932.00 $ 34,932.00 33% $ 70,848.00 - 100% $34,932.00 0% $0.00 0% $0.00 0% $0.00 $0.00
3 6" PVC Water Main and Hydrant Leads 176 lin. ft. $ 64.50 $ 11,352.00 24.00 $ 1,548.00 24.00 $ 1,548.00 $ 1,548.00 14% $ 9,804.00 - 100% $1,548.00 0% $0.00 0% $0.00 0% $0.00 $0.00
4 10" Gate Valves and Boxes 4 each $ 4,616.00 $ 18,464.00 - $ - - $ - $ - 0% $ 18,464.00 - 100% $0.00 0% $0.00 0% $0.00 0% $0.00 $0.00
5 8" Gate Valves and Boxes 12 each $ 3,338.00 $ 40,056.00 - $ - 3.00 $ 10,014.00 $ 10,014.00 25% $ 30,042.00 - 100% $10,014.00 0% $0.00 0% $0.00 0% $0.00 $0.00
6 6" Gate Valves and Boxes 6 each $ 2,543.00 $ 15,258.00 1.00 $ 2,543.00 2.00 $ 5,086.00 $ 5,086.00 33% $ 10,172.00 - 100% $5,086.00 0% $0.00 0% $0.00 0% $0.00 $0.00
7 Hydrants 6 each $ 6,432.00 $ 38,592.00 - $ - 1.00 $ 6,432.00 $ 6,432.00 17% $ 32,160.00 - 100% $6,432.00 0% $0.00 0% $0.00 0% $0.00 $0.00
8 1" Corporation Stops 13 each $ 777.00 $ 10,101.00 - $ - - $ - $ - 0% $ 10,101.00 - 100% $0.00 0% $0.00 0% $0.00 0% $0.00 $0.00
9 1" Curb Stops 13 each $ 708.40 $ 9,209.20 - $ - - $ - $ - 0% $ 9,209.20 - 100% $0.00 0% $0.00 0% $0.00 0% $0.00 $0.00
10 1" HDPE Water Service 500 lin. ft. $ 48.40 $ 24,200.00 - $ - - $ - $ - 0% $ 24,200.00 - 100% $0.00 0% $0.00 0% $0.00 0% $0.00 $0.00
11 Existing Lateral Reconnections 13 each $ 1,156.00 $ 15,028.00 - $ - - $ - $ - 0% $ 15,028.00 - 100% $0.00 0% $0.00 0% $0.00 0% $0.00 $0.00
12 Existing Main Reconnection 6 each $ 7,850.80 $ 47,104.80 - - 0% $ 47,104.80 - 100% $0.00 0% $0.00 0% $0.00 0% $0.00 $0.00
BASE BID - Sewer
13 24" PVC SDR 35 Sanitary Sewer 455 lin. ft. $ 178.10 $ 81,035.50 - $ - - $ - $ - 0% $ 81,035.50 - 0% $0.00 100% $0.00 0% $0.00 0% $0.00 $0.00
14 24" PVC SDR 26 Sanitary Sewer 1,400 lin. ft. $ 260.00 $ 364,000.00 ######## $ 359,580.00 1,383.00 $ 359,580.00 $ 359,580.00 99% $ 4,420.00 - 0% $0.00 100% $359,580.00 0% $0.00 0% $0.00 $0.00
15 8" PVC SDR 35 Sanitary Sewer 80 lin. ft. $ 112.60 $ 9,008.00 6.00 $ 675.60 6.00 $ 675.60 $ 675.60 8% $ 8,332.40 - 0% $0.00 100% $675.60 0% $0.00 0% $0.00 $0.00
16 10" PVC SDR 35 Sanitary Sewer 10 lin. ft. $ 239.00 $ 2,390.00 4.00 $ 956.00 4.00 $ 956.00 $ 956.00 40% $ 1,434.00 - 0% $0.00 100% $956.00 0% $0.00 0% $0.00 $0.00
17 Sanitary Manhole Castings 12 each $ 912.00 $ 10,944.00 - $ - - $ - $ - 0% $ 10,944.00 - 0% $0.00 100% $0.00 0% $0.00 0% $0.00 $0.00
18 48" Drop Manhole Masonry 11 vert. ft. $ 700.00 $ 7,700.00 18.00 $ 12,600.00 18.00 $ 12,600.00 $ 12,600.00 164% $ (4,900.00) - 0% $0.00 100% $12,600.00 0% $0.00 0% $0.00 $0.00
19 60" Drop Manhole Masonry 11 vert. ft. $ 700.00 $ 7,700.00 9.00 $ 6,300.00 9.00 $ 6,300.00 $ 6,300.00 82% $ 1,400.00 - 0% $0.00 100% $6,300.00 0% $0.00 0% $0.00 $0.00
20 48” Standard Sanitary Manhole Masonry 112 vert. ft. $ 352.00 $ 39,424.00 61.38 $ 21,605.76 61.38 $ 21,605.76 $ 21,605.76 55% $ 17,818.24 - 0% $0.00 100% $21,605.76 0% $0.00 0% $0.00 $0.00
21 60" Standard Sanitary Manhole Masonry 54 vert. ft. $ 1,350.00 $ 72,900.00 49.06 $ 66,231.00 49.06 $ 66,231.00 $ 66,231.00 91% $ 6,669.00 - 0% $0.00 100% $66,231.00 0% $0.00 0% $0.00 $0.00
22 24" x 6" Sanitary Sewer Wyes 11 each $ 5,150.00 $ 56,650.00 5.00 $ 25,750.00 5.00 $ 25,750.00 $ 25,750.00 45% $ 30,900.00 - 0% $0.00 100% $25,750.00 0% $0.00 0% $0.00 $0.00
23 6" PVC Sanitary Laterals 250 lin. ft. $ 136.80 $ 34,200.00 155.00 $ 21,204.00 155.00 $ 21,204.00 $ 21,204.00 62% $ 12,996.00 - 0% $0.00 100% $21,204.00 0% $0.00 0% $0.00 $0.00
24 Sanitary Tracer Wire Boxes 11 each $ 401.00 $ 4,411.00 5.00 $ 2,005.00 5.00 $ 2,005.00 $ 2,005.00 45% $ 2,406.00 - 0% $0.00 100% $2,005.00 0% $0.00 0% $0.00 $0.00
BASE BID - Storm
25 12" CL IV RCP Storm Sewer 80 lin. ft. $ 80.15 $ 6,412.00 - $ - - $ - $ - 0% $ 6,412.00 - 0% $0.00 0% $0.00 100% $0.00 0% $0.00 $0.00
26 18" CL III RCP Storm Sewer 45 lin. ft. $ 180.00 $ 8,100.00 - $ - - $ - $ - 0% $ 8,100.00 - 0% $0.00 0% $0.00 100% $0.00 0% $0.00 $0.00
26A 15" CL IV RCP Storm Sewer 38 lin. ft. $ 93.90 $ 3,568.20 - $ - - $ - $ - 0% $ 3,568.20 - 0% $0.00 0% $0.00 100% $0.00 0% $0.00 $0.00
26B 24" CL III RCP Storm Sewer 10 lin. ft. $ 142.50 $ 1,425.00 - $ - - $ - $ - 0% $ 1,425.00 - 0% $0.00 0% $0.00 100% $0.00 0% $0.00 $0.00
27 30" CL III RCP Storm Sewer 100 lin. ft. $ 136.10 $ 13,610.00 - $ - - $ - $ - 0% $ 13,610.00 - 0% $0.00 0% $0.00 100% $0.00 0% $0.00 $0.00
28 24" x 36" Storm Sewer Rectangular Catch
Basins with Castings
8 each $ 3,912.00 $ 31,296.00 - $ - - $ - $ - 0% $ 31,296.00 - 0% $0.00 0% $0.00 100% $0.00 0% $0.00 $0.00
29 5' Storm Sewer Manhole Inlet with
Casting
4 each $ 6,696.00 $ 26,784.00 - $ - - $ - $ - 0% $ 26,784.00 - 0% $0.00 0% $0.00 100% $0.00 0% $0.00 $0.00
30 15" Concrete Endwall 2 each $ 2,020.00 $ 4,040.00 - - 0% $ 4,040.00 - 0% $0.00 0% $0.00 100% $0.00 0% $0.00 $0.00
BASE BID - Street
31 Erosion Control 1 lump sum $ 8,960.00 $ 8,960.00 - $ - 1.00 $ 8,960.00 $ 8,960.00 100% $ - - 20% $1,792.00 20% $1,792.00 0% $0.00 60% $5,376.00 $0.00
32 Traffic Control 1 lump sum $ 17,008.00 $ 17,008.00 0.25 $ 4,252.00 0.75 $ 12,756.00 $ 12,756.00 75% $ 4,252.00 - 20% $2,551.20 20% $2,551.20 0% $0.00 60% $7,653.60 $0.00
33 Excavation/ Fill to Subgrade 1 lump sum $ 432,331.00 $ 432,331.00 0.25 $ 108,082.75 0.25 $ 108,082.75 $ 108,082.75 25% $ 324,248.25 - 20% $21,616.55 20% $21,616.55 0% $0.00 60% $64,849.65 $0.00
34 Excavation and Disposal of Bad Subbase
Below Subgrade
1,850 cu. yds. $ 20.00 $ 37,000.00 616.93 $ 12,338.60 616.93 $ 12,338.60 $ 12,338.60 33% $ 24,661.40 - 20% $2,467.72 20% $2,467.72 0% $0.00 60% $7,403.16 $0.00
35 3" Breaker Run and Replacement of
Excavation of Bad Subbase Below
Subgrade
10,100 tons $ 14.00 $ 141,400.00 ######## $ 26,124.84 1,866.06 $ 26,124.84 $ 26,124.84 18% $ 115,275.16 - 20% $5,224.97 20% $5,224.97 0% $0.00 60% $15,674.90 $0.00
36 ¾" Crushed Aggregate Base Course 6,000 tons $ 15.50 $ 93,000.00 504.00 $ 7,812.00 504.00 $ 7,812.00 $ 7,812.00 8% $ 85,188.00 - 20% $1,562.40 20% $1,562.40 0% $0.00 60% $4,687.20 $0.00
37 Sawcutting Existing Concrete and Asphalt
Pavements
200 lin. ft. $ 3.00 $ 600.00 - $ - - $ - $ - 0% $ 600.00 - 20% $0.00 20% $0.00 0% $0.00 60% $0.00 $0.00
38 30" Concrete Curb & Gutter 4,250 lin. ft. $ 20.35 $ 86,487.50 - $ - - $ - $ - 0% $ 86,487.50 - 20% $0.00 20% $0.00 0% $0.00 60% $0.00 $0.00
39 6" Thick Concrete Sidewalk and Driveway
Approaches
1,650 sq. ft. $ 6.06 $ 9,999.00 - $ - - $ - $ - 0% $ 9,999.00 - 20% $0.00 20% $0.00 0% $0.00 60% $0.00 $0.00
40 4" Thick Concrete Sidewalk 7,500 sq. ft. $ 5.56 $ 41,700.00 - $ - - $ - $ - 0% $ 41,700.00 - 20% $0.00 20% $0.00 0% $0.00 60% $0.00 $0.00
41 6' Wide Concrete Step with Handrail 125 tread ft. $ 144.00 $ 18,000.00 - $ - - $ - $ - 0% $ 18,000.00 - 20% $0.00 20% $0.00 0% $0.00 60% $0.00 $0.00
42 Truncated Dome Panels 100 sq. ft. $ 45.45 $ 4,545.00 - $ - - $ - $ - 0% $ 4,545.00 - 20% $0.00 20% $0.00 0% $0.00 60% $0.00 $0.00
43 Topsoil Restoration, Seeding, Fertilizing &
Mulching
9,800 sq. yds. $ 5.50 $ 53,900.00 - $ - - $ - $ - 0% $ 53,900.00 - 20% $0.00 20% $0.00 0% $0.00 60% $0.00 $0.00
44 2" Hot-Mix Asphalt Surface Course, Type 5
LT
1,400 tons $ 73.23 $ 102,522.00 - $ - - $ - $ - 0% $ 102,522.00 - 20% $0.00 20% $0.00 0% $0.00 60% $0.00 $0.00
45 2" Hot-Mix Asphalt Lower Course, Type 4
LT
1,400 tons $ 71.72 $ 100,408.00 - $ - - $ - $ - 0% $ 100,408.00 - 20% $0.00 20% $0.00 0% $0.00 60% $0.00 $0.00
46 Clean & Tack 11,050 sq. yds. $ 0.16 $ 1,768.00 - $ - - $ - $ - 0% $ 1,768.00 - 20% $0.00 20% $0.00 0% $0.00 60% $0.00 $0.00
47 2" Hot-Mix Asphalt Paving and Driveways 450 sq. yds. $ 19.19 $ 8,635.50 - $ - - $ - $ - 0% $ 8,635.50 - 20% $0.00 20% $0.00 0% $0.00 60% $0.00 $0.00
Original Contract
Bid Item
No.
Contract Information This Period Work Completed Work
Completed and
Materials
Stored to Date
(H) ($)
% of
Value of
Item
(J / F)
(%)
Balance to Finish
(F - J)
($)
Application Date:
Contractor's Application for Payment
City of Lodi
Town & Country Engineering, Inc. LOD 04
S & L Underground, Inc.
2026 Street & Utility Improvements – Fair Street
Page 1 of 2
Description Item Qty. Units Unit Price
($)
Value of Bid Item
(C X E) ($)
Qty. Value ($) Estimated
Quantity
Incorporated
in the Work
Value of Work
Completed to
Date
(E X G) ($)
Bid Item
No.
Contract Information This Period Work Completed Work
Completed and
Materials
Stored to Date
(H) ($)
% of
Value of
Item
(J / F)
(%)
Balance to Finish
(F - J)
($)
48 Segmental Block Retaining Wall 750 face ft. $ 65.00 $ 48,750.00 - $ - - $ - $ - 0% $ 48,750.00 - 0% $0.00 0% $0.00 0% $0.00 100% $0.00 $0.00
49 Excavation and Fill at Restroom Wall 1 lump sum $ 11,250.00 $ 11,250.00 - $ - - $ - $ - 0% $ 11,250.00 - 0% $0.00 0% $0.00 0% $0.00 100% $0.00 $0.00
50 Pavement Marking 1 lump sum $ 5,675.00 $ 5,675.00 - $ - - $ - $ - 0% $ 5,675.00 - 20% $0.00 20% $0.00 0% $0.00 60% $0.00 $0.00
51 Gravel Shoulder 525 lin. ft. $ 1.90 $ 997.50 - - 0% $ 997.50 - 0% $0.00 0% $0.00 0% $0.00 100% $0.00 $0.00
BASE BID - Parking Lot
52 Site Grading 1 lump sum $ 32,922.00 $ 32,922.00 0.50 $ 16,461.00 0.50 $ 16,461.00 $ 16,461.00 50% $ 16,461.00 - 0% $0.00 0% $0.00 0% $0.00 100% $16,461.00 $0.00
53 Excavation and Disposal of Bad Subbase
Below Subgrade
500 cu. yds. $ 22.60 $ 11,300.00 - $ - - $ - $ - 0% $ 11,300.00 - 0% $0.00 0% $0.00 0% $0.00 100% $0.00 $0.00
54 3" Breaker Run and Replacement of
Excavation of Bad Subbase Below
Subgrade
1,400 tons $ 14.00 $ 19,600.00 - $ - - $ - $ - 0% $ 19,600.00 - 0% $0.00 0% $0.00 0% $0.00 100% $0.00 $0.00
55 ¾" Crushed Aggregate Base Course 1,275 tons $ 15.20 $ 19,380.00 - $ - - $ - $ - 0% $ 19,380.00 - 0% $0.00 0% $0.00 0% $0.00 100% $0.00 $0.00
56 3" Hot-Mix Asphalt Surface Course, Type 4
LT
550 tons $ 80.81 $ 44,445.50 - $ - - $ - $ - 0% $ 44,445.50 - 0% $0.00 0% $0.00 0% $0.00 100% $0.00 $0.00
57 Mobilization/Bonds/Insurance 1 lump sum $ 35,093.00 $ 35,093.00 0.50 $ 17,546.50 0.50 $ 17,546.50 $ 17,546.50 50% $ 17,546.50 - 0% $0.00 0% $0.00 0% $0.00 100% $17,546.50 $0.00
BASE BID - Township Roadway $ - $ - $ -
58 Performance & Payment Bonds 1 lump sum $ 1,437.00 $ 1,437.00 - $ - - $ - $ - 0% $ 1,437.00 - 0% $0.00 0% $0.00 0% $0.00 17% $0.00 $0.00
59 Mobilization 1 lump sum $ 2,940.00 $ 2,940.00 - $ - - $ - $ - 0% $ 2,940.00 - 0% $0.00 0% $0.00 0% $0.00 17% $0.00 $0.00
60 Traffic Control & Signage 1 lump sum $ 200.00 $ 200.00 - $ - - $ - $ - 0% $ 200.00 - 0% $0.00 0% $0.00 0% $0.00 17% $0.00 $0.00
61 Excavation Below Subgrade (Excavation
Only)
400 cu. yds. $ 19.60 $ 7,840.00 - $ - - $ - $ - 0% $ 7,840.00 - 0% $0.00 0% $0.00 0% $0.00 17% $0.00 $0.00
62 Base Aggregate Dense - EBS Replacement
(3" Breaker Run)
840 tons $ 13.30 $ 11,172.00 - $ - - $ - $ - 0% $ 11,172.00 - 0% $0.00 0% $0.00 0% $0.00 17% $0.00 $0.00
63 Finish Grading In Preparation of Paving 3,870 sq. yds. $ 1.30 $ 5,031.00 - $ - - $ - $ - 0% $ 5,031.00 - 0% $0.00 0% $0.00 0% $0.00 17% $0.00 $0.00
64 Seal Finished Pavement 3,870 sq. yds. $ 3.68 $ 14,241.60 - $ - - $ - $ - 0% $ 14,241.60 - 0% $0.00 0% $0.00 0% $0.00 17% $0.00 $0.00
65 HMA Pavement, Upper Layer 2" thickness
(5 LT 58-28 S)
460 tons $ 71.11 $ 32,710.60 - $ - - $ - $ - 0% $ 32,710.60 - 0% $0.00 0% $0.00 0% $0.00 17% $0.00 $0.00
66 HMA Pavement, Lower Layer 2" thickness
(4 LT 58-28 S)
460 tons $ 69.19 $ 31,827.40 - $ - - $ - $ - 0% $ 31,827.40 - 0% $0.00 0% $0.00 0% $0.00 17% $0.00 $0.00
67 HMA Pavement, 5 LT 58-28 S - 2"
(Driveways)
200 tons $ 121.21 $ 24,242.00 - $ - - $ - $ - 0% $ 24,242.00 - 0% $0.00 0% $0.00 0% $0.00 10% $0.00 $0.00
68 Clean and Sweep Asphalt 3,870 sq. yds. $ 0.20 $ 774.00 - $ - - $ - $ - 0% $ 774.00 - 0% $0.00 0% $0.00 0% $0.00 17% $0.00 $0.00
69 Asphalt Tack Coat 3,870 sq. yds. $ 0.16 $ 619.20 - $ - - $ - $ - 0% $ 619.20 - 0% $0.00 0% $0.00 0% $0.00 17% $0.00 $0.00
70 Base Aggregate Dense - 3/4" Aggregate
(Shoulders)
200 tons $ 16.30 $ 3,260.00 - $ - - $ - $ - 0% $ 3,260.00 - 0% $0.00 0% $0.00 0% $0.00 9% $0.00 $0.00
71 Compact & Shape Shoulder Material 3,050 lin. ft. $ 0.97 $ 2,958.50 - $ - - $ - $ - 0% $ 2,958.50 - 0% $0.00 0% $0.00 0% $0.00 17% $0.00 $0.00
72 Base Aggregate Dense - 3/4" (Driveways) 60 tons $ 29.00 $ 1,740.00 - $ - - $ - $ - 0% $ 1,740.00 - 0% $0.00 0% $0.00 0% $0.00 0% $0.00 $0.00
73 Pulverize & Relay Asphalt Pavement 3,870 sq. yds. $ 2.00 $ 7,740.00 - $ - - $ - $ - 0% $ 7,740.00 - 0% $0.00 0% $0.00 0% $0.00 0% $0.00 $0.00
74 Remove Existing Storm Sewer Pipe 108 lin. ft. $ 23.00 $ 2,484.00 - $ - - $ - $ - 0% $ 2,484.00 - 0% $0.00 0% $0.00 0% $0.00 0% $0.00 $0.00
75 18" CMP Storm Sewer Pipe 39 lin. ft. $ 67.60 $ 2,636.40 - $ - - $ - $ - 0% $ 2,636.40 - 0% $0.00 0% $0.00 0% $0.00 0% $0.00 $0.00
76 18" Metal End Section 2 each $ 495.00 $ 990.00 - $ - - $ - $ - 0% $ 990.00 - 0% $0.00 0% $0.00 0% $0.00 0% $0.00 $0.00
77 21" x 15" CMP Storm Sewer Pipe 28 lin. ft. $ 73.00 $ 2,044.00 - $ - - $ - $ - 0% $ 2,044.00 - 0% $0.00 0% $0.00 0% $0.00 0% $0.00 $0.00
78 21" x 15" Metal End Section 1 each $ 486.00 $ 486.00 - $ - - $ - $ - 0% $ 486.00 - 0% $0.00 0% $0.00 0% $0.00 0% $0.00 $0.00
79 21" CMP Storm Sewer Pipe 45 lin. ft. $ 73.00 $ 3,285.00 - $ - - $ - $ - 0% $ 3,285.00 - 0% $0.00 0% $0.00 0% $0.00 0% $0.00 $0.00
80 21" Metal End Section 2 each $ 516.00 $ 1,032.00 - $ - - $ - $ - 0% $ 1,032.00 - 0% $0.00 0% $0.00 0% $0.00 0% $0.00 $0.00
81 Sawcut Pavement 420 lin. ft. $ 3.00 $ 1,260.00 - - 0% $ 1,260.00 - 0% $0.00 0% $0.00 0% $0.00 17% $0.00 $0.00
ALTERNATE BID NO. 1 - ASPHALT PATH $ - $ - $ -
A1-1 Segmental Block Retaining Wall 850 face ft. $ 65.00 $ 55,250.00 - $ - - $ - $ - 0% $ 55,250.00 - 0% $0.00 0% $0.00 0% $0.00 100% $0.00 $0.00
A1-2 8' Wide Asphalt Path 400 sq. yds. $ 17.30 $ 6,920.00 - $ - - $ - $ - 0% $ 6,920.00 - 0% $0.00 0% $0.00 0% $0.00 100% $0.00 $0.00
A1-3 ¾" Crushed Aggregate Base Course 150 tons $ 25.50 $ 3,825.00 - - 0% $ 3,825.00 - 0% $0.00 0% $0.00 0% $0.00 100% $0.00 $0.00
ALTERNATE BID NO. 2 - ASSESSIBLE VIEWING AREAS - $ - - $ - $ - $0.00
A2-1 Accessible Viewing Area # 1 1 lump sum $ 10,000.00 $ 10,000.00 - $ - - $ - $ - 0% $ 10,000.00 - 0% $0.00 0% $0.00 0% $0.00 100% $0.00 $0.00
A2-2 Accessible Viewing Area # 2 1 lump sum $ 10,000.00 $ 10,000.00 - - 0% $ 10,000.00 - 0% $0.00 0% $0.00 0% $0.00 100% $0.00 $0.00
SUPPLEMENTAL BID ITEMS $ - $ - $ -
S1. Removal of Unsuitable Trench Backfill 2,500 cu. yds. in
trench
$ 20.00 $ 50,000.00 ######## $ 20,040.00 1,002.00 $ 20,040.00 $ 20,040.00 40% $ 29,960.00 - 50% $10,020.00 50% $10,020.00 0% $0.00 0% $0.00 $0.00
S2. Dewatering 4,750 trench ft. $ 0.01 $ 47.50 - $ - - $ - $ - 0% $ 47.50 - 50% $0.00 50% $0.00 0% $0.00 0% $0.00 $0.00
S3. Property Corner Replacement 26 each $ 50.00 $ 1,300.00 - $ - - $ - $ - 0% $ 1,300.00 - 20% $0.00 20% $0.00 0% $0.00 60% $0.00 $0.00
S4. Abandon Existing Sanitary Sewer Main 300 lin. ft. $ 6.70 $ 2,010.00 - $ - - $ - $ - 0% $ 2,010.00 - 0% $0.00 100% $0.00 0% $0.00 0% $0.00 $0.00
S5. Abandon Existing Sanitary Manhole 1 each $ 732.00 $ 732.00 - $ - - $ - $ - 0% $ 732.00 - 0% $0.00 100% $0.00 0% $0.00 0% $0.00 $0.00
S6. Sanitary Sewer Cleanout 1 lump sum $ 1,170.00 $ 1,170.00 - $ - - $ - $ - 0% $ 1,170.00 - 0% $0.00 100% $0.00 0% $0.00 0% $0.00 $0.00
S7. 4" Tall Split Rail Fence 120 lin. ft. $ 35.00 $ 4,200.00 - $ - - $ - $ - 0% $ 4,200.00 - 0% $0.00 0% $0.00 0% $0.00 100% $0.00 $0.00
S8. Temporary Sewer Bypassing 1 lump sum $ 27,325.00 $ 27,325.00 0.25 $ 6,831.25 1.00 $ 27,325.00 $ 27,325.00 100% $ - - 0% $0.00 100% $27,325.00 0% $0.00 0% $0.00 $0.00
Original Contract Totals 2,900,549.90$ 740,487.30$ 832,366.05$ 832,366.05$ 29% 2,068,183.85$ TOTALS
Cumul. Work To-
Date
Water
Total
$103,246.84 Sewer
Total
$589,467.20 Storm Toal $0.00 Street
Total
$139,652.01 $0.00 $832,366.05
Cumul. Pmt for
Stored Mat;l
$23,084.98 $18,169.65 $41,254.63
Minus Inc. Mat'l (23,084.98) (18,169.65)
0 0 - - $ - $ - $ - - $ - $ - $ - -
0 0 - - $ - $ - $ - - $ - $ - $ - - Water
Retainage
$5,162.34 Sewer
Retainage
$29,473.36 Storm
Retainage
$0.00 Street
Retainage
$6,982.60 $0.00 $41,618.30
0 0 - - $ - $ - $ - - $ - $ - $ - - Water total
minus
retainage
$98,084.50 Sewer total
minus
retainage
$559,993.84 Water total
minus
retainage
$0.00 Water total
minus
retainage
$132,669.41 $0.00 $790,747.75
Change Order Totals -$ -$ -$ -$ Prv Cumul. Pmt. $70,991.15 35,733.10 $0.00 $9,954.48 $0.00 $116,678.73
Water
Total
$27,093.35 Sewer
Total
524,260.74 Storm Toal $0.00 Street
Total
$122,714.93 $0.00 $674,069.02
Project Totals 2,900,549.90$ 832,366.05$ 832,366.05$ 29% 2,068,183.85$
Original Contract and Change Orders
Engineering Approved Totals
Change Orders
5% Retainage on Cumul. Totals
This Payment
Page 2 of 2
RESOLUTION 26- 7 1
RESOLUTION APPR OVING PAY REQUEST # 4 AND CHANGE ORDER # 1 FROM
S&L UNDERGROUND FOR WORK COMPLETED ON THE FAIR ST PROJECT
WHEREAS, the City of Lodi has contracted with S&L Underground to complete the
Fair Street Project; and,
WHEREAS, a R equest for P ayment # 4 was received from S&L Underground; and,
WHEREAS, the City Engineer from Town and Country Engineering has reviewed and
approved P ay R equest # 4 ; and,
WHEREAS, the City Engineer has submitted Change Order # 1 which includes known
utility related changes necessary to complete the project; and
WHEREAS, the City Engineer has reviewed and approved Change Order # 1 ; and,
WHEREAS , the Committee of the Whole has reviewed P ay R equest # 4 and C hange
O rder # 1 and recommended approval .
NOW THEREFORE, BE IT RESOLVED, that the City of Lodi Common Council
approves P ay R equest # 4 in the amount of $1, 262,743.75 and C hange O rder #1 in the amount of
$6 4,934.00 from S&L Underground .
Adopted by the Common Council of the City of Lodi, Wisconsin, on this 2 0 th day of October ,
20 2 6 .
____________________________________
Thomas Marx , Mayor
Attest: __________________________
Arissa Watkins , City Clerk
Madison ⧫ Rhinelander ⧫ Kenosha ⧫ Platteville
6264 Nesbitt Road • Madison, WI 53719 • (608) 273-3350 • tce@tcengineers.net
MEMORANDUM
To: Jennifer Sweeney, City Administrator, City of Lodi
From: Chrisitan Reid, Project Engineer, Town & Country Engineering
Date: 10/1/2026
Subject: 2026 Street and Utility Improvements - Fair Street – Pay Request # 4
Review and Recommendation for Approval
Jennifer,
I have reviewed the complete d submittal for Pay Request No. 4 for the 2026 Street and Utility
Improvements Fair Street Project as submitted by S&L Underground . Based on the
documentation provided and on-site progress observations, I recommend the approval of the pay
request for $1,262,743.75.
The work completed to date aligns with the quantities and unit prices in the contract documents,
and I have verified the billing accuracy against field observations.
Based on the associated project components for this period and the agreed upon method for
assigning costs, the total costs are split as follows:
Water: $443,287.39
Sanitary Sewer: $277,705.99
Storm Sewer: $145,772.13
Remaining (Street): $381,297.69
Township: $14,680.55
Sincerely,
TOWN & COUNTRY ENGINEERING, INC.
Christian Reid, P.E.
Project Engineer
Progress Estimate - Unit Price Work
Owner: Owner's Project No.
Engineer: Engineer's Project No.
Contractor: Contractor's Project No.
Project:
Application No.: 4 From 8/27/2026 to 9/30/2026 10/1/2026
A B C D E F G H J K L
Description Item Qty. Units Unit Price
($)
Value of Bid
Item
(C X E) ($)
Qty. Value ($) Estimated
Quantity
Incorporated
in the Work
Value of Work Completed
to Date
(E X G) ($)
BASE BID - Water
1 10" PVC Water Main 564 lin. ft. $ 100.00 $ 56,400.00 498.00 $ 49,800.00 498.00 $ 49,800.00 $ 49,800.00 88% $ 6,600.00
2 8" PVC Water Main 1,720 lin. ft. $ 61.50 $ 105,780.00 1,173.50 $ 72,170.25 1,741.50 $ 107,102.25 $ 107,102.25 101% $ (1,322.25)
3 6" PVC Water Main and Hydrant Leads 176 lin. ft. $ 64.50 $ 11,352.00 165.00 $ 10,642.50 189.00 $ 12,190.50 $ 12,190.50 107% $ (838.50)
4 10" Gate Valves and Boxes 4 each $ 4,616.00 $ 18,464.00 2.00 $ 9,232.00 2.00 $ 9,232.00 $ 9,232.00 50% $ 9,232.00
5 8" Gate Valves and Boxes 12 each $ 3,338.00 $ 40,056.00 10.00 $ 33,380.00 13.00 $ 43,394.00 $ 43,394.00 108% $ (3,338.00)
6 6" Gate Valves and Boxes 6 each $ 2,543.00 $ 15,258.00 6.00 $ 15,258.00 8.00 $ 20,344.00 $ 20,344.00 133% $ (5,086.00)
7 Hydrants 6 each $ 6,432.00 $ 38,592.00 5.00 $ 32,160.00 6.00 $ 38,592.00 $ 38,592.00 100% $ -
8 1" Corporation Stops 13 each $ 777.00 $ 10,101.00 14.00 $ 10,878.00 14.00 $ 10,878.00 $ 10,878.00 108% $ (777.00)
9 1" Curb Stops 13 each $ 708.40 $ 9,209.20 15.00 $ 10,626.00 15.00 $ 10,626.00 $ 10,626.00 115% $ (1,416.80)
10 1" HDPE Water Service 500 lin. ft. $ 48.40 $ 24,200.00 547.00 $ 26,474.80 547.00 $ 26,474.80 $ 26,474.80 109% $ (2,274.80)
11 Existing Lateral Reconnections 13 each $ 1,156.00 $ 15,028.00 15.00 $ 17,340.00 15.00 $ 17,340.00 $ 17,340.00 115% $ (2,312.00)
12 Existing Main Reconnection 6 each $ 7,850.80 $ 47,104.80 8.00 $ 62,806.40 8.00 $ 62,806.40 $ 62,806.40 133% $ (15,701.60)
BASE BID - Sewer
13 24" PVC SDR 35 Sanitary Sewer 455 lin. ft. $ 178.10 $ 81,035.50 291.00 $ 51,827.10 291.00 $ 51,827.10 $ 51,827.10 64% $ 29,208.40
14 24" PVC SDR 26 Sanitary Sewer 1,400 lin. ft. $ 260.00 $ 364,000.00 164.00 $ 42,640.00 1,547.00 $ 402,220.00 $ 402,220.00 111% $ (38,220.00)
15 8" PVC SDR 35 Sanitary Sewer 80 lin. ft. $ 112.60 $ 9,008.00 34.00 $ 3,828.40 40.00 $ 4,504.00 $ 4,504.00 50% $ 4,504.00
16 10" PVC SDR 35 Sanitary Sewer 10 lin. ft. $ 239.00 $ 2,390.00 2.00 $ 478.00 6.00 $ 1,434.00 $ 1,434.00 60% $ 956.00
17 Sanitary Manhole Castings 12 each $ 912.00 $ 10,944.00 6.00 $ 5,472.00 6.00 $ 5,472.00 $ 5,472.00 50% $ 5,472.00
18 48" Drop Manhole Masonry 11 vert. ft. $ 700.00 $ 7,700.00 - $ - 18.00 $ 12,600.00 $ 12,600.00 164% $ (4,900.00)
19 60" Drop Manhole Masonry 11 vert. ft. $ 700.00 $ 7,700.00 2.27 $ 1,589.00 11.27 $ 7,889.00 $ 7,889.00 102% $ (189.00)
20 48” Standard Sanitary Manhole Masonry 112 vert. ft. $ 352.00 $ 39,424.00 50.62 $ 17,818.24 112.00 $ 39,424.00 $ 39,424.00 100% $ -
21 60" Standard Sanitary Manhole Masonry 54 vert. ft. $ 1,350.00 $ 72,900.00 4.94 $ 6,669.00 54.00 $ 72,900.00 $ 72,900.00 100% $ -
22 24" x 6" Sanitary Sewer Wyes 11 each $ 5,150.00 $ 56,650.00 4.00 $ 20,600.00 9.00 $ 46,350.00 $ 46,350.00 82% $ 10,300.00
23 6" PVC Sanitary Laterals 250 lin. ft. $ 136.80 $ 34,200.00 155.00 $ 21,204.00 310.00 $ 42,408.00 $ 42,408.00 124% $ (8,208.00)
24 Sanitary Tracer Wire Boxes 11 each $ 401.00 $ 4,411.00 4.00 $ 1,604.00 9.00 $ 3,609.00 $ 3,609.00 82% $ 802.00
BASE BID - Storm
25 12" CL IV RCP Storm Sewer 80 lin. ft. $ 80.15 $ 6,412.00 95.00 $ 7,614.25 95.00 $ 7,614.25 $ 7,614.25 119% $ (1,202.25)
26 18" CL III RCP Storm Sewer 45 lin. ft. $ 180.00 $ 8,100.00 356.00 $ 64,080.00 356.00 $ 64,080.00 $ 64,080.00 791% $ (55,980.00)
26A 15" CL IV RCP Storm Sewer 38 lin. ft. $ 93.90 $ 3,568.20 40.00 $ 3,756.00 40.00 $ 3,756.00 $ 3,756.00 105% $ (187.80)
26B 24" CL III RCP Storm Sewer 10 lin. ft. $ 142.50 $ 1,425.00 87.00 $ 12,397.50 87.00 $ 12,397.50 $ 12,397.50 870% $ (10,972.50)
27 30" CL III RCP Storm Sewer 100 lin. ft. $ 136.10 $ 13,610.00 46.00 $ 6,260.60 46.00 $ 6,260.60 $ 6,260.60 46% $ 7,349.40
28 24" x 36" Storm Sewer Rectangular Catch
Basins with Castings
8 each $ 3,912.00 $ 31,296.00 9.00 $ 35,208.00 9.00 $ 35,208.00 $ 35,208.00 113% $ (3,912.00)
29 5' Storm Sewer Manhole Inlet with Casting 4 each $ 6,696.00 $ 26,784.00 3.00 $ 20,088.00 3.00 $ 20,088.00 $ 20,088.00 75% $ 6,696.00
30 15" Concrete Endwall 2 each $ 2,020.00 $ 4,040.00 2.00 $ 4,040.00 2.00 $ 4,040.00 $ 4,040.00 100% $ -
Application Date:
Contractor's Application for Payment
City of Lodi
Town & Country Engineering, Inc. LOD 04
S & L Underground, Inc.
2026 Street & Utility Improvements – Fair Street
Bid Item
No.
Contract Information This Period Work Completed Work Completed and
Materials Stored to
Date
(H) ($)
% of Value
of Item
(J / F)
(%)
Balance to Finish (F - J)
($)
Original Contract
Page 1 of 3
Description Item Qty. Units Unit Price
($)
Value of Bid
Item
(C X E) ($)
Qty. Value ($) Estimated
Quantity
Incorporated
in the Work
Value of Work Completed
to Date
(E X G) ($)
Bid Item
No.
Contract Information This Period Work Completed Work Completed and
Materials Stored to
Date
(H) ($)
% of Value
of Item
(J / F)
(%)
Balance to Finish (F - J)
($)
BASE BID - Street
31 Erosion Control 1 lump sum $ 8,960.00 $ 8,960.00 - $ - 1.00 $ 8,960.00 $ 8,960.00 100% $ -
32 Traffic Control 1 lump sum $ 17,008.00 $ 17,008.00 0.25 $ 4,252.00 1.00 $ 17,008.00 $ 17,008.00 100% $ -
33 Excavation/ Fill to Subgrade 1 lump sum $ 432,331.00 $ 432,331.00 0.75 $ 324,248.25 1.00 $ 432,331.00 $ 432,331.00 100% $ -
34 Excavation and Disposal of Bad Subbase
Below Subgrade
1,850 cu. yds. $ 20.00 $ 37,000.00 1,121.07 $ 22,421.40 1,738.00 $ 34,760.00 $ 34,760.00 94% $ 2,240.00
35 3" Breaker Run and Replacement of
Excavation of Bad Subbase Below
Subgrade
10,100 tons $ 14.00 $ 141,400.00 7,942.26 $ 111,191.64 9,808.32 $ 137,316.48 $ 137,316.48 97% $ 4,083.52
36 ¾" Crushed Aggregate Base Course 6,000 tons $ 15.50 $ 93,000.00 3,067.00 $ 47,538.50 3,571.00 $ 55,350.50 $ 55,350.50 60% $ 37,649.50
37 Sawcutting Existing Concrete and Asphalt
Pavements
200 lin. ft. $ 3.00 $ 600.00 $ - - $ - $ - 0% $ 600.00
38 30" Concrete Curb & Gutter 4,250 lin. ft. $ 20.35 $ 86,487.50 $ - - $ - $ - 0% $ 86,487.50
39 6" Thick Concrete Sidewalk and Driveway
Approaches
1,650 sq. ft. $ 6.06 $ 9,999.00 $ - - $ - $ - 0% $ 9,999.00
40 4" Thick Concrete Sidewalk 7,500 sq. ft. $ 5.56 $ 41,700.00 $ - - $ - $ - 0% $ 41,700.00
41 6' Wide Concrete Step with Handrail 125 tread ft. $ 144.00 $ 18,000.00 $ - - $ - $ - 0% $ 18,000.00
42 Truncated Dome Panels 100 sq. ft. $ 45.45 $ 4,545.00 $ - - $ - $ - 0% $ 4,545.00
43 Topsoil Restoration, Seeding, Fertilizing &
Mulching
9,800 sq. yds. $ 5.50 $ 53,900.00 $ - - $ - $ - 0% $ 53,900.00
44 2" Hot-Mix Asphalt Surface Course, Type 5
LT
1,400 tons $ 73.23 $ 102,522.00 $ - - $ - $ - 0% $ 102,522.00
45 2" Hot-Mix Asphalt Lower Course, Type 4
LT
1,400 tons $ 71.72 $ 100,408.00 $ - - $ - $ - 0% $ 100,408.00
46 Clean & Tack 11,050 sq. yds. $ 0.16 $ 1,768.00 $ - - $ - $ - 0% $ 1,768.00
47 2" Hot-Mix Asphalt Paving and Driveways 450 sq. yds. $ 19.19 $ 8,635.50 $ - - $ - $ - 0% $ 8,635.50
48 Segmental Block Retaining Wall 750 face ft. $ 65.00 $ 48,750.00 $ - - $ - $ - 0% $ 48,750.00
49 Excavation and Fill at Restroom Wall 1 lump sum $ 11,250.00 $ 11,250.00 1.00 $ 11,250.00 1.00 $ 11,250.00 $ 11,250.00 100% $ -
50 Pavement Marking 1 lump sum $ 5,675.00 $ 5,675.00 $ - - $ - $ - 0% $ 5,675.00
51 Gravel Shoulder 525 lin. ft. $ 1.90 $ 997.50 $ - - $ - $ - 0% $ 997.50
BASE BID - Parking Lot
52 Site Grading 1 lump sum $ 32,922.00 $ 32,922.00 0.50 $ 16,461.00 1.00 $ 32,922.00 $ 32,922.00 100% $ -
53 Excavation and Disposal of Bad Subbase
Below Subgrade
500 cu. yds. $ 22.60 $ 11,300.00 350.00 $ 7,910.00 350.00 $ 7,910.00 $ 7,910.00 70% $ 3,390.00
54 3" Breaker Run and Replacement of
Excavation of Bad Subbase Below
Subgrade
1,400 tons $ 14.00 $ 19,600.00 2,336.49 $ 32,710.86 2,336.49 $ 32,710.86 $ 32,710.86 167% $ (13,110.86)
55 ¾" Crushed Aggregate Base Course 1,275 tons $ 15.20 $ 19,380.00 604.30 $ 9,185.36 604.30 $ 9,185.36 $ 9,185.36 47% $ 10,194.64
56 3" Hot-Mix Asphalt Surface Course, Type 4
LT
550 tons $ 80.81 $ 44,445.50 $ - - $ - $ - 0% $ 44,445.50
57 Mobilization/Bonds/Insurance 1 lump sum $ 35,093.00 $ 35,093.00 0.50 $ 17,546.50 1.00 $ 35,093.00 $ 35,093.00 100% $ -
BASE BID - Township Roadway
58 Performance & Payment Bonds 1 lump sum $ 1,437.00 $ 1,437.00 1.00 $ 1,437.00 1.00 $ 1,437.00 $ 1,437.00 100% $ -
59 Mobilization 1 lump sum $ 2,940.00 $ 2,940.00 0.50 $ 1,470.00 0.50 $ 1,470.00 $ 1,470.00 50% $ 1,470.00
60 Traffic Control & Signage 1 lump sum $ 200.00 $ 200.00 0.50 $ 100.00 0.50 $ 100.00 $ 100.00 50% $ 100.00
61 Excavation Below Subgrade (Excavation
Only)
400 cu. yds. $ 19.60 $ 7,840.00 $ - - $ - $ - 0% $ 7,840.00
62 Base Aggregate Dense - EBS Replacement
(3" Breaker Run)
840 tons $ 13.30 $ 11,172.00 $ - - $ - $ - 0% $ 11,172.00
63 Finish Grading In Preparation of Paving 3,870 sq. yds. $ 1.30 $ 5,031.00 $ - - $ - $ - 0% $ 5,031.00
64 Seal Finished Pavement 3,870 sq. yds. $ 3.68 $ 14,241.60 $ - - $ - $ - 0% $ 14,241.60
Page 2 of 3
Description Item Qty. Units Unit Price
($)
Value of Bid
Item
(C X E) ($)
Qty. Value ($) Estimated
Quantity
Incorporated
in the Work
Value of Work Completed
to Date
(E X G) ($)
Bid Item
No.
Contract Information This Period Work Completed Work Completed and
Materials Stored to
Date
(H) ($)
% of Value
of Item
(J / F)
(%)
Balance to Finish (F - J)
($)
65 HMA Pavement, Upper Layer 2" thickness
(5 LT 58-28 S)
460 tons $ 71.11 $ 32,710.60 $ - - $ - $ - 0% $ 32,710.60
66 HMA Pavement, Lower Layer 2" thickness
(4 LT 58-28 S)
460 tons $ 69.19 $ 31,827.40 $ - - $ - $ - 0% $ 31,827.40
67 HMA Pavement, 5 LT 58-28 S - 2"
(Driveways)
200 tons $ 121.21 $ 24,242.00 $ - - $ - $ - 0% $ 24,242.00
68 Clean and Sweep Asphalt 3,870 sq. yds. $ 0.20 $ 774.00 $ - - $ - $ - 0% $ 774.00
69 Asphalt Tack Coat 3,870 sq. yds. $ 0.16 $ 619.20 $ - - $ - $ - 0% $ 619.20
70 Base Aggregate Dense - 3/4" Aggregate
(Shoulders)
200 tons $ 16.30 $ 3,260.00 $ - - $ - $ - 0% $ 3,260.00
71 Compact & Shape Shoulder Material 3,050 lin. ft. $ 0.97 $ 2,958.50 $ - - $ - $ - 0% $ 2,958.50
72 Base Aggregate Dense - 3/4" (Driveways) 60 tons $ 29.00 $ 1,740.00 $ - - $ - $ - 0% $ 1,740.00
73 Pulverize & Relay Asphalt Pavement 3,870 sq. yds. $ 2.00 $ 7,740.00 $ - - $ - $ - 0% $ 7,740.00
74 Remove Existing Storm Sewer Pipe 108 lin. ft. $ 23.00 $ 2,484.00 108.00 $ 2,484.00 108.00 $ 2,484.00 $ 2,484.00 100% $ -
75 18" CMP Storm Sewer Pipe 39 lin. ft. $ 67.60 $ 2,636.40 39.00 $ 2,636.40 39.00 $ 2,636.40 $ 2,636.40 100% $ -
76 18" Metal End Section 2 each $ 495.00 $ 990.00 2.00 $ 990.00 2.00 $ 990.00 $ 990.00 100% $ -
77 21" x 15" CMP Storm Sewer Pipe 28 lin. ft. $ 73.00 $ 2,044.00 28.00 $ 2,044.00 28.00 $ 2,044.00 $ 2,044.00 100% $ -
78 21" x 15" Metal End Section 1 each $ 486.00 $ 486.00 1.00 $ 486.00 1.00 $ 486.00 $ 486.00 100% $ -
79 21" CMP Storm Sewer Pipe 45 lin. ft. $ 73.00 $ 3,285.00 45.00 $ 3,285.00 45.00 $ 3,285.00 $ 3,285.00 100% $ -
80 21" Metal End Section 2 each $ 516.00 $ 1,032.00 2.00 $ 1,032.00 2.00 $ 1,032.00 $ 1,032.00 100% $ -
81 Sawcut Pavement 420 lin. ft. $ 3.00 $ 1,260.00 $ - - $ - $ - 0% $ 1,260.00
ALTERNATE BID NO. 1 - ASPHALT PATH
A1-1 Segmental Block Retaining Wall 850 face ft. $ 65.00 $ 55,250.00 $ - - $ - $ - 0% $ 55,250.00
A1-2 8' Wide Asphalt Path 400 sq. yds. $ 17.30 $ 6,920.00 $ - - $ - $ - 0% $ 6,920.00
A1-3 ¾" Crushed Aggregate Base Course 150 tons $ 25.50 $ 3,825.00 $ - - $ - $ - 0% $ 3,825.00
ALTERNATE BID NO. 2 - ASSESSIBLE VIEWING AREAS
A2-1 Accessible Viewing Area # 1 1 lump sum $ 10,000.00 $ 10,000.00 $ - - $ - $ - 0% $ 10,000.00
A2-2 Accessible Viewing Area # 2 1 lump sum $ 10,000.00 $ 10,000.00 $ - - $ - $ - 0% $ 10,000.00
SUPPLEMENTAL BID ITEMS
S1. Removal of Unsuitable Trench Backfill 2,500 cu. yds. in
trench
$ 20.00 $ 50,000.00 1,392.00 $ 27,840.00 2,394.00 $ 47,880.00 $ 47,880.00 96% $ 2,120.00
S2. Dewatering 4,750 trench ft. $ 0.01 $ 47.50 $ - - $ - $ - 0% $ 47.50
S3. Property Corner Replacement 26 each $ 50.00 $ 1,300.00 $ - - $ - $ - 0% $ 1,300.00
S4. Abandon Existing Sanitary Sewer Main 300 lin. ft. $ 6.70 $ 2,010.00 300.00 $ 2,010.00 300.00 $ 2,010.00 $ 2,010.00 100% $ -
S5. Abandon Existing Sanitary Manhole 1 each $ 732.00 $ 732.00 1.00 $ 732.00 1.00 $ 732.00 $ 732.00 100% $ -
S6. Sanitary Sewer Cleanout 1 lump sum $ 1,170.00 $ 1,170.00 $ - - $ - $ - 0% $ 1,170.00
S7. 4" Tall Split Rail Fence 120 lin. ft. $ 35.00 $ 4,200.00 $ - - $ - $ - 0% $ 4,200.00
S8. Temporary Sewer Bypassing 1 lump sum $ 27,325.00 $ 27,325.00 $ - 1.00 $ 27,325.00 $ 27,325.00 100% $ -
Original Contract Totals 2,900,549.90$ 1,329,203.95$ 2,161,570.00$ 2,161,570.00$ 75% 738,979.90$
Change Order Totals -$ -$ -$ -$
Project Totals 2,900,549.90$ 2,161,570.00$ 2,161,570.00$ 75%
Change Orders
Original Contract and Change Orders
Page 3 of 3
Progress Estimate - Unit Price Work
Owner: Owner's Project No.
Engineer: Engineer's Project No.
Contractor: Contractor's Project No.
Project:
Application No.: 2 From 8/28/2026 to 9/30/2026 10/1/2026
A B C D E F G H J K L
Description Item Qty. Units Unit Price
($)
Value of Bid Item
(C X E) ($)
Qty. Value ($) Estimated
Quantity
Incorporated
in the Work
Value of Work
Completed to
Date
(E X G) ($)
Water % Water Cost Sanitary % Sanitary Cost Storm % Storm Cost Street % Street Cost Township Cost
BASE BID - Water
1 10" PVC Water Main 564 lin. ft. $ 100.00 $ 56,400.00 498.00 $ 49,800.00 498.00 $ 49,800.00 $ 49,800.00 88% $ 6,600.00 - 100% $49,800.00 0% $0.00 0% $0.00 0% $0.00 $0.00
2 8" PVC Water Main 1,720 lin. ft. $ 61.50 $ 105,780.00 ######## $ 72,170.25 1,741.50 $ 107,102.25 $ 107,102.25 101% $ (1,322.25) - 100% $107,102.25 0% $0.00 0% $0.00 0% $0.00 $0.00
3 6" PVC Water Main and Hydrant Leads 176 lin. ft. $ 64.50 $ 11,352.00 165.00 $ 10,642.50 189.00 $ 12,190.50 $ 12,190.50 107% $ (838.50) - 100% $12,190.50 0% $0.00 0% $0.00 0% $0.00 $0.00
4 10" Gate Valves and Boxes 4 each $ 4,616.00 $ 18,464.00 2.00 $ 9,232.00 2.00 $ 9,232.00 $ 9,232.00 50% $ 9,232.00 - 100% $9,232.00 0% $0.00 0% $0.00 0% $0.00 $0.00
5 8" Gate Valves and Boxes 12 each $ 3,338.00 $ 40,056.00 10.00 $ 33,380.00 13.00 $ 43,394.00 $ 43,394.00 108% $ (3,338.00) - 100% $43,394.00 0% $0.00 0% $0.00 0% $0.00 $0.00
6 6" Gate Valves and Boxes 6 each $ 2,543.00 $ 15,258.00 6.00 $ 15,258.00 8.00 $ 20,344.00 $ 20,344.00 133% $ (5,086.00) - 100% $20,344.00 0% $0.00 0% $0.00 0% $0.00 $0.00
7 Hydrants 6 each $ 6,432.00 $ 38,592.00 5.00 $ 32,160.00 6.00 $ 38,592.00 $ 38,592.00 100% $ - - 100% $38,592.00 0% $0.00 0% $0.00 0% $0.00 $0.00
8 1" Corporation Stops 13 each $ 777.00 $ 10,101.00 14.00 $ 10,878.00 14.00 $ 10,878.00 $ 10,878.00 108% $ (777.00) - 100% $10,878.00 0% $0.00 0% $0.00 0% $0.00 $0.00
9 1" Curb Stops 13 each $ 708.40 $ 9,209.20 15.00 $ 10,626.00 15.00 $ 10,626.00 $ 10,626.00 115% $ (1,416.80) - 100% $10,626.00 0% $0.00 0% $0.00 0% $0.00 $0.00
10 1" HDPE Water Service 500 lin. ft. $ 48.40 $ 24,200.00 547.00 $ 26,474.80 547.00 $ 26,474.80 $ 26,474.80 109% $ (2,274.80) - 100% $26,474.80 0% $0.00 0% $0.00 0% $0.00 $0.00
11 Existing Lateral Reconnections 13 each $ 1,156.00 $ 15,028.00 15.00 $ 17,340.00 15.00 $ 17,340.00 $ 17,340.00 115% $ (2,312.00) - 100% $17,340.00 0% $0.00 0% $0.00 0% $0.00 $0.00
12 Existing Main Reconnection 6 each $ 7,850.80 $ 47,104.80 8.00 $ 62,806.40 8.00 $ 62,806.40 $ 62,806.40 133% $ (15,701.60) - 100% $62,806.40 0% $0.00 0% $0.00 0% $0.00 $0.00
BASE BID - Sewer -
13 24" PVC SDR 35 Sanitary Sewer 455 lin. ft. $ 178.10 $ 81,035.50 291.00 $ 51,827.10 291.00 $ 51,827.10 $ 51,827.10 64% $ 29,208.40 - 0% $0.00 100% $51,827.10 0% $0.00 0% $0.00 $0.00
14 24" PVC SDR 26 Sanitary Sewer 1,400 lin. ft. $ 260.00 $ 364,000.00 164.00 $ 42,640.00 1,547.00 $ 402,220.00 $ 402,220.00 111% $ (38,220.00) - 0% $0.00 100% $402,220.00 0% $0.00 0% $0.00 $0.00
15 8" PVC SDR 35 Sanitary Sewer 80 lin. ft. $ 112.60 $ 9,008.00 34.00 $ 3,828.40 40.00 $ 4,504.00 $ 4,504.00 50% $ 4,504.00 - 0% $0.00 100% $4,504.00 0% $0.00 0% $0.00 $0.00
16 10" PVC SDR 35 Sanitary Sewer 10 lin. ft. $ 239.00 $ 2,390.00 2.00 $ 478.00 6.00 $ 1,434.00 $ 1,434.00 60% $ 956.00 - 0% $0.00 100% $1,434.00 0% $0.00 0% $0.00 $0.00
17 Sanitary Manhole Castings 12 each $ 912.00 $ 10,944.00 6.00 $ 5,472.00 6.00 $ 5,472.00 $ 5,472.00 50% $ 5,472.00 - 0% $0.00 100% $5,472.00 0% $0.00 0% $0.00 $0.00
18 48" Drop Manhole Masonry 11 vert. ft. $ 700.00 $ 7,700.00 - $ - 18.00 $ 12,600.00 $ 12,600.00 164% $ (4,900.00) - 0% $0.00 100% $12,600.00 0% $0.00 0% $0.00 $0.00
19 60" Drop Manhole Masonry 11 vert. ft. $ 700.00 $ 7,700.00 2.27 $ 1,589.00 11.27 $ 7,889.00 $ 7,889.00 102% $ (189.00) - 0% $0.00 100% $7,889.00 0% $0.00 0% $0.00 $0.00
20 48” Standard Sanitary Manhole Masonry 112 vert. ft. $ 352.00 $ 39,424.00 50.62 $ 17,818.24 112.00 $ 39,424.00 $ 39,424.00 100% $ - - 0% $0.00 100% $39,424.00 0% $0.00 0% $0.00 $0.00
21 60" Standard Sanitary Manhole Masonry 54 vert. ft. $ 1,350.00 $ 72,900.00 4.94 $ 6,669.00 54.00 $ 72,900.00 $ 72,900.00 100% $ - - 0% $0.00 100% $72,900.00 0% $0.00 0% $0.00 $0.00
22 24" x 6" Sanitary Sewer Wyes 11 each $ 5,150.00 $ 56,650.00 4.00 $ 20,600.00 9.00 $ 46,350.00 $ 46,350.00 82% $ 10,300.00 - 0% $0.00 100% $46,350.00 0% $0.00 0% $0.00 $0.00
23 6" PVC Sanitary Laterals 250 lin. ft. $ 136.80 $ 34,200.00 155.00 $ 21,204.00 310.00 $ 42,408.00 $ 42,408.00 124% $ (8,208.00) - 0% $0.00 100% $42,408.00 0% $0.00 0% $0.00 $0.00
24 Sanitary Tracer Wire Boxes 11 each $ 401.00 $ 4,411.00 4.00 $ 1,604.00 9.00 $ 3,609.00 $ 3,609.00 82% $ 802.00 - 0% $0.00 100% $3,609.00 0% $0.00 0% $0.00 $0.00
BASE BID - Storm -
25 12" CL IV RCP Storm Sewer 80 lin. ft. $ 80.15 $ 6,412.00 95.00 $ 7,614.25 95.00 $ 7,614.25 $ 7,614.25 119% $ (1,202.25) - 0% $0.00 0% $0.00 100% $7,614.25 0% $0.00 $0.00
26 18" CL III RCP Storm Sewer 45 lin. ft. $ 180.00 $ 8,100.00 356.00 $ 64,080.00 356.00 $ 64,080.00 $ 64,080.00 791% $ (55,980.00) - 0% $0.00 0% $0.00 100% $64,080.00 0% $0.00 $0.00
26A 15" CL IV RCP Storm Sewer 38 lin. ft. $ 93.90 $ 3,568.20 40.00 $ 3,756.00 40.00 $ 3,756.00 $ 3,756.00 105% $ (187.80) - 0% $0.00 0% $0.00 100% $3,756.00 0% $0.00 $0.00
26B 24" CL III RCP Storm Sewer 10 lin. ft. $ 142.50 $ 1,425.00 87.00 $ 12,397.50 87.00 $ 12,397.50 $ 12,397.50 870% $ (10,972.50) - 0% $0.00 0% $0.00 100% $12,397.50 0% $0.00 $0.00
27 30" CL III RCP Storm Sewer 100 lin. ft. $ 136.10 $ 13,610.00 46.00 $ 6,260.60 46.00 $ 6,260.60 $ 6,260.60 46% $ 7,349.40 - 0% $0.00 0% $0.00 100% $6,260.60 0% $0.00 $0.00
28 24" x 36" Storm Sewer Rectangular Catch
Basins with Castings
8 each $ 3,912.00 $ 31,296.00 9.00 $ 35,208.00 9.00 $ 35,208.00 $ 35,208.00 113% $ (3,912.00) - 0% $0.00 0% $0.00 100% $35,208.00 0% $0.00 $0.00
29 5' Storm Sewer Manhole Inlet with
Casting
4 each $ 6,696.00 $ 26,784.00 3.00 $ 20,088.00 3.00 $ 20,088.00 $ 20,088.00 75% $ 6,696.00 - 0% $0.00 0% $0.00 100% $20,088.00 0% $0.00 $0.00
30 15" Concrete Endwall 2 each $ 2,020.00 $ 4,040.00 2.00 $ 4,040.00 2.00 $ 4,040.00 $ 4,040.00 100% $ - - 0% $0.00 0% $0.00 100% $4,040.00 0% $0.00 $0.00
BASE BID - Street -
31 Erosion Control 1 lump sum $ 8,960.00 $ 8,960.00 - $ - 1.00 $ 8,960.00 $ 8,960.00 100% $ - - 20% $1,792.00 20% $1,792.00 0% $0.00 60% $5,376.00 $0.00
32 Traffic Control 1 lump sum $ 17,008.00 $ 17,008.00 0.25 $ 4,252.00 1.00 $ 17,008.00 $ 17,008.00 100% $ - - 20% $3,401.60 20% $3,401.60 0% $0.00 60% $10,204.80 $0.00
33 Excavation/ Fill to Subgrade 1 lump sum $ 432,331.00 $ 432,331.00 0.75 $ 324,248.25 1.00 $ 432,331.00 $ 432,331.00 100% $ - - 20% $86,466.20 20% $86,466.20 0% $0.00 60% $259,398.60 $0.00
34 Excavation and Disposal of Bad Subbase
Below Subgrade
1,850 cu. yds. $ 20.00 $ 37,000.00 ######## $ 22,421.40 1,738.00 $ 34,760.00 $ 34,760.00 94% $ 2,240.00 - 20% $6,952.00 20% $6,952.00 0% $0.00 60% $20,856.00 $0.00
35 3" Breaker Run and Replacement of
Excavation of Bad Subbase Below
Subgrade
10,100 tons $ 14.00 $ 141,400.00 ######## $ 111,191.64 9,808.32 $ 137,316.48 $ 137,316.48 97% $ 4,083.52 - 20% $27,463.30 20% $27,463.30 0% $0.00 60% $82,389.89 $0.00
36 ¾" Crushed Aggregate Base Course 6,000 tons $ 15.50 $ 93,000.00 ######## $ 47,538.50 3,571.00 $ 55,350.50 $ 55,350.50 60% $ 37,649.50 - 20% $11,070.10 20% $11,070.10 0% $0.00 60% $33,210.30 $0.00
37 Sawcutting Existing Concrete and Asphalt
Pavements
200 lin. ft. $ 3.00 $ 600.00 - $ - - $ - $ - 0% $ 600.00 - 20% $0.00 20% $0.00 0% $0.00 60% $0.00 $0.00
38 30" Concrete Curb & Gutter 4,250 lin. ft. $ 20.35 $ 86,487.50 - $ - - $ - $ - 0% $ 86,487.50 - 20% $0.00 20% $0.00 0% $0.00 60% $0.00 $0.00
39 6" Thick Concrete Sidewalk and Driveway
Approaches
1,650 sq. ft. $ 6.06 $ 9,999.00 - $ - - $ - $ - 0% $ 9,999.00 - 20% $0.00 20% $0.00 0% $0.00 60% $0.00 $0.00
40 4" Thick Concrete Sidewalk 7,500 sq. ft. $ 5.56 $ 41,700.00 - $ - - $ - $ - 0% $ 41,700.00 - 20% $0.00 20% $0.00 0% $0.00 60% $0.00 $0.00
41 6' Wide Concrete Step with Handrail 125 tread ft. $ 144.00 $ 18,000.00 - $ - - $ - $ - 0% $ 18,000.00 - 20% $0.00 20% $0.00 0% $0.00 60% $0.00 $0.00
42 Truncated Dome Panels 100 sq. ft. $ 45.45 $ 4,545.00 - $ - - $ - $ - 0% $ 4,545.00 - 20% $0.00 20% $0.00 0% $0.00 60% $0.00 $0.00
43 Topsoil Restoration, Seeding, Fertilizing &
Mulching
9,800 sq. yds. $ 5.50 $ 53,900.00 - $ - - $ - $ - 0% $ 53,900.00 - 20% $0.00 20% $0.00 0% $0.00 60% $0.00 $0.00
44 2" Hot-Mix Asphalt Surface Course, Type 5
LT
1,400 tons $ 73.23 $ 102,522.00 - $ - - $ - $ - 0% $ 102,522.00 - 20% $0.00 20% $0.00 0% $0.00 60% $0.00 $0.00
45 2" Hot-Mix Asphalt Lower Course, Type 4
LT
1,400 tons $ 71.72 $ 100,408.00 - $ - - $ - $ - 0% $ 100,408.00 - 20% $0.00 20% $0.00 0% $0.00 60% $0.00 $0.00
46 Clean & Tack 11,050 sq. yds. $ 0.16 $ 1,768.00 - $ - - $ - $ - 0% $ 1,768.00 - 20% $0.00 20% $0.00 0% $0.00 60% $0.00 $0.00
47 2" Hot-Mix Asphalt Paving and Driveways 450 sq. yds. $ 19.19 $ 8,635.50 - $ - - $ - $ - 0% $ 8,635.50 - 20% $0.00 20% $0.00 0% $0.00 60% $0.00 $0.00
Original Contract
Bid Item
No.
Contract Information This Period Work Completed Work
Completed and
Materials
Stored to Date
(H) ($)
% of
Value of
Item
(J / F)
(%)
Balance to Finish
(F - J)
($)
Application Date:
Contractor's Application for Payment
City of Lodi
Town & Country Engineering, Inc. LOD 04
S & L Underground, Inc.
2026 Street & Utility Improvements – Fair Street
Page 1 of 2
Description Item Qty. Units Unit Price
($)
Value of Bid Item
(C X E) ($)
Qty. Value ($) Estimated
Quantity
Incorporated
in the Work
Value of Work
Completed to
Date
(E X G) ($)
Bid Item
No.
Contract Information This Period Work Completed Work
Completed and
Materials
Stored to Date
(H) ($)
% of
Value of
Item
(J / F)
(%)
Balance to Finish
(F - J)
($)
48 Segmental Block Retaining Wall 750 face ft. $ 65.00 $ 48,750.00 - $ - - $ - $ - 0% $ 48,750.00 - 0% $0.00 0% $0.00 0% $0.00 100% $0.00 $0.00
49 Excavation and Fill at Restroom Wall 1 lump sum $ 11,250.00 $ 11,250.00 1.00 $ 11,250.00 1.00 $ 11,250.00 $ 11,250.00 100% $ - - 0% $0.00 0% $0.00 0% $0.00 100% $11,250.00 $0.00
50 Pavement Marking 1 lump sum $ 5,675.00 $ 5,675.00 - $ - - $ - $ - 0% $ 5,675.00 - 20% $0.00 20% $0.00 0% $0.00 60% $0.00 $0.00
51 Gravel Shoulder 525 lin. ft. $ 1.90 $ 997.50 - - 0% $ 997.50 - 0% $0.00 0% $0.00 0% $0.00 100% $0.00 $0.00
BASE BID - Parking Lot -
52 Site Grading 1 lump sum $ 32,922.00 $ 32,922.00 0.50 $ 16,461.00 1.00 $ 32,922.00 $ 32,922.00 100% $ - - 0% $0.00 0% $0.00 0% $0.00 100% $32,922.00 $0.00
53 Excavation and Disposal of Bad Subbase
Below Subgrade
500 cu. yds. $ 22.60 $ 11,300.00 350.00 $ 7,910.00 350.00 $ 7,910.00 $ 7,910.00 70% $ 3,390.00 - 0% $0.00 0% $0.00 0% $0.00 100% $7,910.00 $0.00
54 3" Breaker Run and Replacement of
Excavation of Bad Subbase Below
Subgrade
1,400 tons $ 14.00 $ 19,600.00 ######## $ 32,710.86 2,336.49 $ 32,710.86 $ 32,710.86 167% $ (13,110.86) - 0% $0.00 0% $0.00 0% $0.00 100% $32,710.86 $0.00
55 ¾" Crushed Aggregate Base Course 1,275 tons $ 15.20 $ 19,380.00 604.30 $ 9,185.36 604.30 $ 9,185.36 $ 9,185.36 47% $ 10,194.64 - 0% $0.00 0% $0.00 0% $0.00 100% $9,185.36 $0.00
56 3" Hot-Mix Asphalt Surface Course, Type 4
LT
550 tons $ 80.81 $ 44,445.50 - $ - - $ - $ - 0% $ 44,445.50 - 0% $0.00 0% $0.00 0% $0.00 100% $0.00 $0.00
57 Mobilization/Bonds/Insurance 1 lump sum $ 35,093.00 $ 35,093.00 0.50 $ 17,546.50 1.00 $ 35,093.00 $ 35,093.00 100% $ - - 0% $0.00 0% $0.00 0% $0.00 100% $35,093.00 $0.00
BASE BID - Township Roadway $ - $ - $ - -
58 Performance & Payment Bonds 1 lump sum $ 1,437.00 $ 1,437.00 1.00 $ 1,437.00 1.00 $ 1,437.00 $ 1,437.00 100% $ - - 0% $0.00 0% $0.00 0% $0.00 17% $244.29 $1,192.71
59 Mobilization 1 lump sum $ 2,940.00 $ 2,940.00 0.50 $ 1,470.00 0.50 $ 1,470.00 $ 1,470.00 50% $ 1,470.00 - 0% $0.00 0% $0.00 0% $0.00 17% $249.90 $1,220.10
60 Traffic Control & Signage 1 lump sum $ 200.00 $ 200.00 0.50 $ 100.00 0.50 $ 100.00 $ 100.00 50% $ 100.00 - 0% $0.00 0% $0.00 0% $0.00 17% $17.00 $83.00
61 Excavation Below Subgrade (Excavation
Only)
400 cu. yds. $ 19.60 $ 7,840.00 - $ - - $ - $ - 0% $ 7,840.00 - 0% $0.00 0% $0.00 0% $0.00 17% $0.00 $0.00
62 Base Aggregate Dense - EBS Replacement
(3" Breaker Run)
840 tons $ 13.30 $ 11,172.00 - $ - - $ - $ - 0% $ 11,172.00 - 0% $0.00 0% $0.00 0% $0.00 17% $0.00 $0.00
63 Finish Grading In Preparation of Paving 3,870 sq. yds. $ 1.30 $ 5,031.00 - $ - - $ - $ - 0% $ 5,031.00 - 0% $0.00 0% $0.00 0% $0.00 17% $0.00 $0.00
64 Seal Finished Pavement 3,870 sq. yds. $ 3.68 $ 14,241.60 - $ - - $ - $ - 0% $ 14,241.60 - 0% $0.00 0% $0.00 0% $0.00 17% $0.00 $0.00
65 HMA Pavement, Upper Layer 2" thickness
(5 LT 58-28 S)
460 tons $ 71.11 $ 32,710.60 - $ - - $ - $ - 0% $ 32,710.60 - 0% $0.00 0% $0.00 0% $0.00 17% $0.00 $0.00
66 HMA Pavement, Lower Layer 2" thickness
(4 LT 58-28 S)
460 tons $ 69.19 $ 31,827.40 - $ - - $ - $ - 0% $ 31,827.40 - 0% $0.00 0% $0.00 0% $0.00 17% $0.00 $0.00
67 HMA Pavement, 5 LT 58-28 S - 2"
(Driveways)
200 tons $ 121.21 $ 24,242.00 - $ - - $ - $ - 0% $ 24,242.00 - 0% $0.00 0% $0.00 0% $0.00 10% $0.00 $0.00
68 Clean and Sweep Asphalt 3,870 sq. yds. $ 0.20 $ 774.00 - $ - - $ - $ - 0% $ 774.00 - 0% $0.00 0% $0.00 0% $0.00 17% $0.00 $0.00
69 Asphalt Tack Coat 3,870 sq. yds. $ 0.16 $ 619.20 - $ - - $ - $ - 0% $ 619.20 - 0% $0.00 0% $0.00 0% $0.00 17% $0.00 $0.00
70 Base Aggregate Dense - 3/4" Aggregate
(Shoulders)
200 tons $ 16.30 $ 3,260.00 - $ - - $ - $ - 0% $ 3,260.00 - 0% $0.00 0% $0.00 0% $0.00 9% $0.00 $0.00
71 Compact & Shape Shoulder Material 3,050 lin. ft. $ 0.97 $ 2,958.50 - $ - - $ - $ - 0% $ 2,958.50 - 0% $0.00 0% $0.00 0% $0.00 17% $0.00 $0.00
72 Base Aggregate Dense - 3/4" (Driveways) 60 tons $ 29.00 $ 1,740.00 - $ - - $ - $ - 0% $ 1,740.00 - 0% $0.00 0% $0.00 0% $0.00 0% $0.00 $0.00
73 Pulverize & Relay Asphalt Pavement 3,870 sq. yds. $ 2.00 $ 7,740.00 - $ - - $ - $ - 0% $ 7,740.00 - 0% $0.00 0% $0.00 0% $0.00 0% $0.00 $0.00
74 Remove Existing Storm Sewer Pipe 108 lin. ft. $ 23.00 $ 2,484.00 108.00 $ 2,484.00 108.00 $ 2,484.00 $ 2,484.00 100% $ - - 0% $0.00 0% $0.00 0% $0.00 0% $0.00 $2,484.00
75 18" CMP Storm Sewer Pipe 39 lin. ft. $ 67.60 $ 2,636.40 39.00 $ 2,636.40 39.00 $ 2,636.40 $ 2,636.40 100% $ - - 0% $0.00 0% $0.00 0% $0.00 0% $0.00 $2,636.40
76 18" Metal End Section 2 each $ 495.00 $ 990.00 2.00 $ 990.00 2.00 $ 990.00 $ 990.00 100% $ - - 0% $0.00 0% $0.00 0% $0.00 0% $0.00 $990.00
77 21" x 15" CMP Storm Sewer Pipe 28 lin. ft. $ 73.00 $ 2,044.00 28.00 $ 2,044.00 28.00 $ 2,044.00 $ 2,044.00 100% $ - - 0% $0.00 0% $0.00 0% $0.00 0% $0.00 $2,044.00
78 21" x 15" Metal End Section 1 each $ 486.00 $ 486.00 1.00 $ 486.00 1.00 $ 486.00 $ 486.00 100% $ - - 0% $0.00 0% $0.00 0% $0.00 0% $0.00 $486.00
79 21" CMP Storm Sewer Pipe 45 lin. ft. $ 73.00 $ 3,285.00 45.00 $ 3,285.00 45.00 $ 3,285.00 $ 3,285.00 100% $ - - 0% $0.00 0% $0.00 0% $0.00 0% $0.00 $3,285.00
80 21" Metal End Section 2 each $ 516.00 $ 1,032.00 2.00 $ 1,032.00 2.00 $ 1,032.00 $ 1,032.00 100% $ - - 0% $0.00 0% $0.00 0% $0.00 0% $0.00 $1,032.00
81 Sawcut Pavement 420 lin. ft. $ 3.00 $ 1,260.00 - - 0% $ 1,260.00 - 0% $0.00 0% $0.00 0% $0.00 17% $0.00 $0.00
ALTERNATE BID NO. 1 - ASPHALT PATH $ - $ - $ - -
A1-1 Segmental Block Retaining Wall 850 face ft. $ 65.00 $ 55,250.00 - $ - - $ - $ - 0% $ 55,250.00 - 0% $0.00 0% $0.00 0% $0.00 100% $0.00 $0.00
A1-2 8' Wide Asphalt Path 400 sq. yds. $ 17.30 $ 6,920.00 - $ - - $ - $ - 0% $ 6,920.00 - 0% $0.00 0% $0.00 0% $0.00 100% $0.00 $0.00
A1-3 ¾" Crushed Aggregate Base Course 150 tons $ 25.50 $ 3,825.00 - - 0% $ 3,825.00 - 0% $0.00 0% $0.00 0% $0.00 100% $0.00 $0.00
ALTERNATE BID NO. 2 - ASSESSIBLE VIEWING AREAS $ - $ - $ - - $0.00
A2-1 Accessible Viewing Area # 1 1 lump sum $ 10,000.00 $ 10,000.00 - $ - - $ - $ - 0% $ 10,000.00 - 0% $0.00 0% $0.00 0% $0.00 100% $0.00 $0.00
A2-2 Accessible Viewing Area # 2 1 lump sum $ 10,000.00 $ 10,000.00 - - 0% $ 10,000.00 - 0% $0.00 0% $0.00 0% $0.00 100% $0.00 $0.00
SUPPLEMENTAL BID ITEMS $ - $ - $ - -
S1. Removal of Unsuitable Trench Backfill 2,500 cu. yds. in
trench
$ 20.00 $ 50,000.00 ######## $ 27,840.00 2,394.00 $ 47,880.00 $ 47,880.00 96% $ 2,120.00 - 50% $23,940.00 50% $23,940.00 0% $0.00 0% $0.00 $0.00
S2. Dewatering 4,750 trench ft. $ 0.01 $ 47.50 - $ - - $ - $ - 0% $ 47.50 - 50% $0.00 50% $0.00 0% $0.00 0% $0.00 $0.00
S3. Property Corner Replacement 26 each $ 50.00 $ 1,300.00 - $ - - $ - $ - 0% $ 1,300.00 - 20% $0.00 20% $0.00 0% $0.00 60% $0.00 $0.00
S4. Abandon Existing Sanitary Sewer Main 300 lin. ft. $ 6.70 $ 2,010.00 300.00 $ 2,010.00 300.00 $ 2,010.00 $ 2,010.00 100% $ - - 0% $0.00 100% $2,010.00 0% $0.00 0% $0.00 $0.00
S5. Abandon Existing Sanitary Manhole 1 each $ 732.00 $ 732.00 1.00 $ 732.00 1.00 $ 732.00 $ 732.00 100% $ - - 0% $0.00 100% $732.00 0% $0.00 0% $0.00 $0.00
S6. Sanitary Sewer Cleanout 1 lump sum $ 1,170.00 $ 1,170.00 - $ - - $ - $ - 0% $ 1,170.00 - 0% $0.00 100% $0.00 0% $0.00 0% $0.00 $0.00
S7. 4" Tall Split Rail Fence 120 lin. ft. $ 35.00 $ 4,200.00 - $ - - $ - $ - 0% $ 4,200.00 - 0% $0.00 0% $0.00 0% $0.00 100% $0.00 $0.00
S8. Temporary Sewer Bypassing 1 lump sum $ 27,325.00 $ 27,325.00 - $ - 1.00 $ 27,325.00 $ 27,325.00 100% $ - - 0% $0.00 100% $27,325.00 0% $0.00 0% $0.00 $0.00
Original Contract Totals 2,900,549.90$ ############ 2,161,570.00$ 2,161,570.00$ 75% 738,979.90$ TOTALS
Cumul. Work To-
Date
Water
Total
$569,865.15 Sewer
Total
$881,789.30 Storm Toal $153,444.35 Street
Total
$541,018.00 $15,453.21 ############
Cumul. Pmt for
Stored Mat;l
$23,084.98 $18,169.65 $41,254.63
Minus Inc. Mat'l (23,084.98) (18,169.65)
-
- Water
Retainage
$28,493.26 Sewer
Retainage
$44,089.46 Storm
Retainage
$7,672.22 Street
Retainage
$27,050.90 $772.66 $108,078.50
- Water total
minus
retainage
$541,371.89 Sewer total
minus
retainage
$837,699.83 Water total
minus
retainage
$145,772.13 Water total
minus
retainage
$513,967.10 $14,680.55 ############
Change Order Totals -$ -$ -$ -$ Prv Cumul. Pmt. $98,084.50 559,993.84 $0.00 $132,669.41 $0.00 $790,747.75
Water
Total
$443,287.39 Sewer
Total
277,705.99 Storm Toal $145,772.13 Street
Total
$381,297.69 $14,680.55 ############
Project Totals 2,900,549.90$ 2,161,570.00$ 2,161,570.00$ 75% 738,979.90$
Original Contract and Change Orders
Engineering Approved Totals
Change Orders
5% Retainage on Cumul. Totals
This Payment
Page 2 of 2
RESOLUTION 2 6- 72
AUTHORIZING THE RELOCATION OF THE WASTE WATER
TREATMENT FACILITY TO A NEW SITE
WHEREAS , in 2024, the City of Lodi undertook a planning effort with Town & Country
Engineering to evaluate the current waste water treatment facility ; and
WHEREAS, in 2025, Town & Country Engineering identified the need to expand the
scope of services to consider treatment at a new treatment facility site ; and
WHEREAS, through this process, Town & Country Engineering also evaluated cost-
effective treatment alternatives, possible regional waste water treatment partners, and maintaining
treatment at the existing site; and
WHEREAS, the Committee of the Whole has evaluated the options through several
presentations provided by Town & Country Engineering ; and
WHEREAS, relocating the waste water treatment facility to a new site provides a long-
term, cost-effective option, that promote s growth and economic development for the City of Lodi.
NOW, THEREFORE BE IT RESOLVED , by the Common Council of the City of Lodi,
Columbia County, Wisconsin, that a new waste water treatment facility be built on a new site that
optionally includes spray fields; and
BE IT FURTHER RESOLVED, that the Mayor and City Administrator are authorized
to move forward with an appraisal and negotiate for a designated piece of land that satisfies the
requirements imposed by the Department of Natural Resources when locating a new waste water
treatment facility on a new site .
Adopted by the Common Council of the City of Lodi, Wisconsin on this 20 th day of
October , 2026 .
____________________________________
Thomas Marx , Mayor
Attest: ______________________ ____ ____
Arissa Watkins , City Clerk
RESOLUTION 26 -73
RESOLUTION AUTHORIZING LETTER OF AGREEMENT
WITH MUELLER COMMUNICATIONS
WHEREAS, the re is a financial need for the City to increase its levy limit in order to
fund key services ; and
WHEREAS, a letter of agreement was received from Mueller Communications to
p rovide communication services for a potential referendum ; and
WHEREAS , the City of Lodi Committee of the Whole has reviewed and recommended
approval of the proposal .
NOW, THEREFORE, BE IT RESOLVED that the City of Lodi Common Council
hereby approves the letter or agreement as presented and authorizes the City Administrator to
sign the engagement letter .
Adopted by the Common Council of the City of Lodi, Wisconsin , on this 20 th day of
October , 20 2 6 .
____________________________________
Thomas Marx , Mayor
Attest: _____________________ _____ _____
Arissa Watkins, City Clerk
DRAFT
October 2, 2026 Jennifer Sweeney City Administrator City of Lodi 130 S. Main Street Lodi, WI 53555 jsweeney@cityoflodi.us Re: Letter of Agreement Dear Jennifer: This correspondence serves as the Letter of Agreement between the City of Lodi and
Mueller
Communications
LLC
(Mueller
Communications).
It
outlines
the
nature
and
terms
of
the
working
relationship
between
our
organizations
for
referendum-related
communications.
Mueller Communications will provide strategic communications counsel and will create
and
execute
a
public
information
and
education
effort
that
clearly
articulates
for
voters
the
need
for
additional
resources
and
the
impact
to
the
community
if
the
April
2027
referendum
passes
or
fails.
Fees for these services will be billed on an hourly, “pay-as-you-go” basis. We anticipate
professional
fees
to
execute
the
tasks
outlined
in
the
September
2026
proposal
will
not
exceed
$34,561.
This
does
not
include
fees
for
third-party
vendors,
including
printing
and
mailing
costs
or
media
spend,
which
would
be
determined
and
agreed
upon
as
part
of
our
engagement,
but
are
currently
estimated
to
be
about
$6,960.
In addition to professional fees, Mueller Communications charges an administrative
service
&
technology
fee
of
seven
and
a
half
percent
(7.5%)
of
the
monthly
professional
fees
to
cover
internal
expenses
incurred
on
client’s
behalf. A
copy
of
Mueller
Communications’
Standard
Expense
Reimbursement
Policy
has
been
enclosed
for
your
review.
Mueller Communications posts invoices, which are payable upon receipt, at the end of
each
month
for
services
performed
that
month.
Each
invoice
includes
a
separate
breakdown
of
out-of-pocket
expenses
and
a
monthly
summary
of
activities
performed.
Also, please understand and agree that Mueller Communications cannot undertake to
verify
all
the
information
supplied
to
us
by
you
and
your
employees.
Therefore,
we
ask
you
to
agree
to
indemnify
and
hold
harmless
Mueller
Communications
and
its
officers
and
employees
from
and
against
any
demands,
claims,
or
liability
actually
incurred
or
suffered
by
us
directly
414.390.5500 | 108 E. Pleasant St., Milwaukee, WI 53212 | muellercommunications.com
DRAFT
City of Lodi / Letter of Agreement October 2, 2026 Page 2
relating to or arising out of the inaccuracy of the information provided to us by you hereunder
and
all
reasonable
cost
and
expenses
incurred
by
us
in
connection
therewith,
including
without
limitation,
reasonable
attorneys’
fees
and
cost
of
litigation.
This indemnification obligation shall not apply to demands, claims or liabilities relating to
or
arising
out
of
our
negligence
or
misconduct.
Likewise,
we
will
indemnify
and
hold
you
and
your
employees
harmless
from
and
against
any
demands,
claims
and
losses
or
liabilities
actually
incurred
or
suffered
by
you
in
connection
with
the
services
rendered
by
us,
except
for
demands,
claims
and
losses
or
liabilities
relating
to
or
arising
out
of
your
negligence
or
misconduct.
The
provisions
of
this
paragraph
shall
survive
the
expiration
or
termination
of
this
Letter
of
Agreement.
By signing below, the terms of this engagement letter are agreed to. An electronic
signature
is
legally
equivalent
to
a
handwritten
signature
and
will
have
the
same
effect
as
an
original
handwritten
signature.
Upon
completion
of
the
signing
process,
a
fully
executed
copy
of
this
agreement
will
be
received
via
email
for
your
records.
This
contract
may
be
terminated
at
any
time
with
a
60-day
advance
notice
to
the
affected
parties.
Mueller Communications works to ensure open lines of communication on all aspects of
the
working
relationship
with
clients.
Please
feel
free
to
contact
me
personally
if
you
have
any
questions
or
need
additional
information
on
any
portion
of
this
letter
or
any
other
matter.
We
look
forward
to
continuing
our
work
with
you.
Sincerely, ______________________________ JAMES MADLOM CEO Mueller Communications, LLC Accepted by: ______________________________ JENNIFER SWEENEY City Administrator City of Lodi
414.390.5500 | 108 E. Pleasant St., Milwaukee, WI 53212 | muellercommunications.com
DRAFT
City of Lodi / Letter of Agreement October 2, 2026 Page 3
STANDARD EXPENSE REIMBURSEMENT POLICY In order to provide the high-quality services our clients have come to expect,
Mueller
Communications
LLC
(Mueller
Communications)
incurs
reimbursable
expenses
on
behalf
of
its
clients.
We
have
prepared
this
policy
statement
to
ensure
a
full
understanding
of
how
these
charges
are
handled
and
to
provide
clients
with
more
information
on
our
policy.
Our
main
objective
is
to
develop
a
relationship
with
clients
based
on
mutual
trust.
To
further
that
goal,
Mueller
Communications
expends
funds
on
a
client’s
behalf
with
exactly
the
same
care
and
concern
we
have
for
personal
monies.
Mueller Communications charges an administrative service & technology fee of
seven
point
five
percent
(7.5%)
of
the
monthly
professional
fees
to
cover
internal
expenses
incurred
on
client’s
behalf.
Included
in
this
fee
is
access
to
our
full
suite
of
media
database
and
monitoring
services,
basic
administrative
support,
in-county
travel,
routine
printing,
telecom
and
technology
services.
Any extraordinary expenses will be billed separately. All third-party vendors used are
reputable
and
continually
monitored
for
quality
and
competitiveness.
All
charges
paid
by
Mueller
Communications
on
behalf
of
the
client
will
have
17.65
percent
added
to
cover
the
cost
of
the
oversight
and
administration.
Typical
services
provided
by
third-party
vendors
include,
but
are
not
limited
to,
costs
for
sponsored
content,
ad
buys,
or
direct
mail
/
email
services,
as
well
as
working
meals
and
out-of-county
travel.
We encourage clients to discuss any questions or comments they may have
concerning
this
policy
with
us
at
any
time.
414.390.5500 | 108 E. Pleasant St., Milwaukee, WI 53212 | muellercommunications.com
RESOLUTION 26 -74
RESOLUTION APPROVING PROPOSAL FOR
LEVY LIMIT REFERENDUM PLANNING WITH
EHLERS , INC
WHEREAS, the re is a financial need for the City to increase its levy limit in order to
fund key services ; and
WHEREAS, a propo sal was received from Ehlers to p rovide levy limit referendum
planning ; and
WHEREAS , the City of Lodi Committee of the Whole has reviewed and recommended
approval of the proposal .
NOW, THEREFORE, BE IT RESOLVED that the City of Lodi Common Council
hereby approves the proposal for the Levy Limit Referendum Planning as presented and
authorizes the City Administrator to sign the proposal .
Adopted by the Common Council of the City of Lodi, Wisconsin , on this 20 th day of
October , 20 2 6 .
____________________________________
Thomas Marx , Mayor
Attest: _____________________ _____ _____
Arissa Watkins, City Clerk
BUILDING COMMUNITIES. IT’S WHAT WE DO.
September 2026
Proposal to Provide Levy Limit Referendum Planning to the:
City of Lodi, WI
Prepared by:
Ehlers
N19W24400 Riverwood Drive,
Suite 100
Waukesha, WI 53188
Advisors:
Casey Griffiths
Associate Municipal Advisor
Kayla Thorpe
Municipal Advisor
Documentation of Municipal Advisor Relationship - Appendix B: Levy Limit Referendums
Ehlers & Associates, Inc. Page | 1
Appendix B
Levy Limit Referendum Assistance
Scope of Service
Client has requested that Ehlers assist with undertaking a levy limit referendum pursuant
to Wisconsin Statutes Section 66.0602(4) for the purposes of a Levy Limit Referendum
(“Project”). Ehlers proposes and agrees to provide the following scope of services:
Information Request and Review
• Prior five-years of Levy Limit Worksheets
• Existing General Obligation Debt Information
• Up to four (4) dollar amounts for referendum.
Referendum Analysis
• Using information supplied by client,
o Provide a high-level summary of alternatives to a levy limit referendum.
o Develop a timeline for the referendum approvals process to include a
schedule of public notices, governing body approval date, referendum
election date, and filing deadlines with the Department of Revenue.
o Determine expenditures that will be funded through the proposed levy limit
increase and determine if the levy limit increase will b e one-time, for a fixed
number of years, or ongoing.
o Provide the estimated percentage increase in the levy as a result of the
referendum as well as other calculations as required by the Department of
Revenue.
o Provide draft of the referendum question with supporting material for review
by Client’s legal counsel and the Department of Revenue.
o Provide the tax impact for various home values as determined through
discussion with Client for up to four (4) referendum amounts.
o One (1) presentation to explain the p rojected impacts of the proposed levy
limit increase to the Client’s governing body or selected committee.
o Assist Client with preparation of Notice of Referendum Election (Notice C).
Documentation of Municipal Advisor Relationship - Appendix B: Levy Limit Referendums
Ehlers & Associates, Inc. Page | 2
Compensation
In return for the services set forth in the “Scope of Service,” Client agrees to compensate
Ehlers & Associates in the amount of $4,500 being done in conjunction with a Financial
Management Plan.
Hourly Charges
Ehlers & Associates will bill Client on an hourly basis f or services requested by Client in
conjunction with the engagement that are not specifically identified in the Scope of
Service set forth in this letter. Examples would include:
• Attendance at additional meetings beyond the one (1) included in the base fee.
• Additional scenarios above the four (4) included in the base fee.
• Assistance with additional public notices outside of Notice C.
• Assistance with public relations/information campaign.
Hourly services will be billed at an hourly rate that is dependent upon the task/ staff
required to meet Client requ est at no less than $1 75.00/hour and not to exceed
$400.00/hour.
Payment for Services
For all compensation due to Ehlers & Associates , we will invoice Client once at the
completion of the engagement. Our fees include our normal travel, printing, computer
services, and mail/delivery charges. The invoice is due and payable upon receipt by the
Client.
Client Engagement
If the City finds this proposal suitable, please take the appropriate action and/or
governing body approval.
Please inform us of the decision and we will provide our required disclosures for signature.
RESOLUTION 2 6- 75
AMENDING THE CITY OF LODI 202 6 GENERAL FUND BUDGET
WHEREAS, the City of Lodi Common Council recognizes the year-over-year increasing
challenges with balancing the City ’s budget due to levy limits ; and
WHEREAS, the Common Council has spent down reserves over the last several years to balance
the budget ; and
WHEREAS, the Common Council agrees that six months of operating expenses should remain in
the reserves ; and
WHEREAS, the Common Council recognizes the importance of providing the public with timely,
accurate, and accessible information concerning a potential referendum; and
WHEREAS, the Common Council desires to work with the City ’s financial advisors, Ehlers and a
communications company to determine and effectively communicate the potential need for a referendum;
and
WHEREAS, fund balance applied will offset the expense s .
NOW , THEREFORE BE IT RESOLVED , by the Common Council of the City of Lodi ,
Wisconsin, hereby amends the 20 2 6 General Fund Budget as follows :
Amendment Amount Account
Account Description Increase/(Decrease) Account Number
Referendum Communications $ 44,113 100-51411-0216
Referendum Financial Assistance $ 4,500 100-51520-0216
Financial Management Plan $13,500 100-51520-0216
Adopted by the Common Council of the City of Lodi, Wisconsin, on this 20 th day of October , 20 2 6 .
____________________________________
Thomas Marx , Mayor
Attest: __________________________
Arissa Watkins , City Clerk
RESOLUTION 26- 77
APPOINTING A CITY ATTORNEY
WHEREAS, the current City Attorney , Paul Johnson , has submitted a notice of intent to
resign his position with the City of Lodi at the close of business on November 13 , 2026 ; and
WHEREAS, City Attorney Johnson desires to work cooperatively with his successor in the
transition of work-in-process and in closing out matters; and
WHEREAS, the Mayor nominates City Officials, including the City Attorney, subject to
confirmation by the City Council .
NOW , THEREFORE BE IT RESOLVED that William S. Cole be appointed City
Attorney for a term beginning immediately following the resignation of Paul Johnson ; and
BE IT FURTHER RESOLVED, that Attorney William S. Cole shall be considered legal
counsel to the City of Lodi prior to the resignation date in order to transition work-in process, close
out existing legal matters, and begin working with new legal matters as they arise.
Adopted this 2 0 th day of October , 20 26 by the Common Council of the City of Lodi,
Wisconsin.
______________________________
Thomas Marx , Mayor
Attest: _______________________________
Arissa Watkins , City Clerk
ORDINANCE A-583
AN ORDINANCE TO AMEND CHAPTER 322 VEHICLES, ALL-TERRAIN AND
UTILITY-TERRAIN
The Common Council of the City of Lodi, Columbia County, Wisconsin, do ordain the
amendments of the following language to Chapter 322 Vehicles, All-Terrain and Utility-Terrain:
Section 1. Chapter 322 Vehicles, All-Terrain and Utility-Terrain is hereby amended by adding
the underlined language and deleting the stricken language:
§ 322-F. Vehicles, All-Terrain and Utility-Terrain.
F. The operation of ATVs/UTVs is restricted to the daily period of sunrise and sunset 5:00
a.m. to 10:00 p.m. the same day. Municipal-owned ATVs/UTVs being operated by an on-
duty municipal employee conducting municipal business are exempt from this provision.
Section 2. This ordinance shall become effective the day after publication.
Adopted by the Common Council of the City of Lodi, Wisconsin on this 20th day of October,
2026 on a roll call vote:
_________________________________
Thomas Marx, Mayor
Attest: _________________________________
Arissa Watkins, City Clerk
Lodi Police Department
“Home of Susie the Duck ”
Jessica Quamme , Chief of Police
142 S. Main St. • Lodi, WI 53555
Administrative Office (608) 592-5401 • Fax (608) 592-4117 • Dispatch (608) 742-4166
https://www.cityoflodi.us/142/Police
Please follow us on Facebook at Lodi Police Department. There you can learn
more about the services we provide and stay updated on the latest happenings
at LOPD . For more information about our services, visit our website at
www.cityoflodi.us/142/Police .
Staffing and Budget Concerns :
We continue to operate with two vacant officer positions, placing an ongoing
strain on our current staffing levels. Maintaining adequate coverage required
increased reliance on overtime and part-time officers to meet the department ’s
operational needs.
As a result, we currently project that our budgets will exceed their allocated
amounts by approximately:
$14,5000 in overtime wages
Over $13,000 in part-time officer wages
These projected overages reflect the challenges of maintaining adequate staffing
while continuing to provide the level of service our community expects and
deserves.
Part-Time Officer Hire
We recently hired Alonzo B lev ins as a new part-time officer, with a start date of
October 29, 2026. Alonzo is currently employed as a full-time officer with the
Middleton Police Department and brings valuable law enforcement experience to
our department.
He will still need to complete our field training program; however, we are hopeful
that his training can be accelerated because of his existing law enforcement
knowledge and experience. His primary training needs will involve learning our
depart ment -specific programs, procedures, and systems, as well as those used
by the Columbia County Sheriff ’s Office and Dispatch Center.
His addition will help to provide some relief to our current staffing challenges,
although we will continue to need additional personnel to improve coverage and
reduce our reliance on overtime.
Lodi Police Department
“Home of Susie the Duck ”
Jessica Quamme , Chief of Police
142 S. Main St. • Lodi, WI 53555
Administrative Office (608) 592-5401 • Fax (608) 592-4117 • Dispatch (608) 742-4166
https://www.cityoflodi.us/142/Police
Recruitment and Future Staffing Plans
We have initiated a new application process with the goal of hiring one to two
additional part-time officers. In addition to addressing our immediate staffing
needs, we hope to establish an eligibility list of qualified candidates for future
vacancies.
Looking ahead to the April 2027 referendum, our goal is to position the
department to respond quickly if additional full-time positions are approved. If the
referendum passes, we hope to have the option of transitioning qualified part-
time officers into full-time positions or selecting candidates from the established
eligibility list.
Establishing this pool of qualified candidates now will help us prepare for
potential staffing increases while continuing to address our current operational
needs.
Our immediate priori ties remain maintaining adequate staffing, providing
consistent police services, and managing the department ’s reliance on overtime
and part-time personnel. While the recent hire and ongoing recruitment efforts
are positive steps, our staffing challenges remain significant.
By continuing recruitment efforts now and preparing for the potential outcome of
the April referendum, we can put the department in a stronger position to meet
both our current responsibilities and future staffing needs.
Calls for Service:
Officers responded to or generated a total of 3 70 calls for service in September .
Below is a summary of notable call types for the month.
Accidents: 3 School Resource: 8
Assist Citizen: 6 Theft: 3
Chapter 51: 1 Traffic Stop: 41
Disorderly Conduct: 3 Extra Patrol: 44
Security Checks: 1 41 Threats: 1
Juvenile Complaint: 1 Foot Patrol: 1 0
Sex Offense: 1 Domestic: 2
Welfare: 3 OWI: 1
Lodi Police Department
“Home of Susie the Duck ”
Jessica Quamme , Chief of Police
142 S. Main St. • Lodi, WI 53555
Administrative Office (608) 592-5401 • Fax (608) 592-4117 • Dispatch (608) 742-4166
https://www.cityoflodi.us/142/Police
Other than notable calls listed below, the remainder of calls were routine, non-
emergency calls such as check property, foot patrol, information, parking
complaints, etc.
Notable Calls:
9/2 – Controlled Substances: Ofc. Weaver conducted a traffic stop on a vehicle
driving through the construction zone. The driver was arrested for Poss. of
Methamphetamine, Poss. of Narcotic Drugs, and Poss. of Drug Paraphernalia
9/10 – Domestic: 400blk of N. Main St. for an active domestic altercation.
Intoxicated female arrested for Domestic Battery, Strangulation, Criminal
Damage to Property, and Disorderly Conduct.
9/12 – Chapter 51 (Mental Health): Male subject threatening suicide and had a
knife near the intersection of Corner St. and Elm St. Male subject was placed
under protective custody without incident and taken to the hospital for treatment.
9/14 – Sex Offense: Male and female cited for sexually explicit behavior in the
alley way next to City Hall.
9/17- Domestic: Rolling domestic pulled over onto Millston Ave. Female arrested
for Domestic Disorderly Conduct.
9/18 – Threats: Male arrived at Dove healthcare and threatened employees.
Male was arrested for Disorderly Conduct and Threat s to Health Care Staff.
9/18 – Sexual Assault of a Child: Charges referred to Columbia County Health
and Human Services for review of charges of 2 nd Degree Sexual Assault and
Battery.
9/22 – Suspicious: Ongoing investigation. Report of a male calling into the library
and doing sexually explicit things while on the phone.
9/27 – OWI: Male subject arrested for 5 th offense OWI.
Lodi Police Department
“Home of Susie the Duck ”
Jessica Quamme , Chief of Police
142 S. Main St. • Lodi, WI 53555
Administrative Office (608) 592-5401 • Fax (608) 592-4117 • Dispatch (608) 742-4166
https://www.cityoflodi.us/142/Police
Training:
Background Investigation – Sgt. Schneider
Field Training Officer (FTO) Basic – Sgt. Schneider
Leadership in Policing (LPO) – Ofc. Weaver
Outreach:
9/1 – Ofc. Hartmann stopped out at HS soccer game
9/4 – Ofc. Hartmann stopped out at HS football game
9/5 – Ofc. Weaver stopped out at the HS cross country meet
9/8 – Sgt. Schneider stopped out at HS for games
9/8 – Ofc. Weaver stopped out at HS soccer game
9/13 – Sgt. Schneider stopped out at soccer game at the Fairgrounds
9/17 – Sgt. Schneider stopped out at the football game
9/18 – Of c. Hartmann stopped out at HS football game
9/22 – Ofc. Weaver stopped out at the HS volleyball game
9/25 – Sgt. Schneider stopped out at HS football game
Source: City of Lodi website. First collected Oct 25, 2026.