RecordWell Data

Parks & Recreation Committee Meeting Agenda & Packet October 26, 2026 at 4PM

Village of Weston · Marathon County · meeting of Oct 26, 2026 · Agenda packets

Open the original document More from Village of Weston

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

OFFICIAL MEETING PACKET OF THE PARKS AND RECREATION COMMITTEE CHAIRPERSON/TRUSTEE BARBARA ERMELING PRESIDING DIRECTOR OF PARKS AND RECREATION SHAWN OSTERBRINK; STAFF ADVISOR A meeting of the Parks and Recreation Committee, composed of five (5) appointed members, will convene at Weston Municipal Center , which is located at 4747 Camp Phillips Road, Weston, October 26, 2026, at 4:00 p.m. Village of Weston, Wisconsin ATTENTION – NOTICE OF PUBLIC MEETING Meeting: PARK AND RECREATION COMMITTEE Members: Ermeling (C), Lopes Serrao (VC), Esker, Sleeter, Tatro Ex-Officio: Maloney Staff: Osterbrink, Falkowski Date/Time: Monday, October 26, 2026, at 4:00 p.m. Location: Weston Municipal Center, 4747 Camp Phillips Road, Weston, WI 54476 Agenda: The Agenda Packet will be sent out at least three (3) days prior to the meeting. Attendance: Parks and Recreation Committee Members, please indicate if you will or will not be attending so we may determine in advance if there will be a quorum. Questions: Shawn Osterbrink Jessica Falkowski sosterbrink@westonwi.gov jfalkowski@westonwi.gov (715) 359-6114 (715) 359-6114 PLEASE NOTE THE FOLLOWING INFORMATION: This notice was posted at the Municipal Center, and on the Village’s website at www.westonwi.gov, and was emailed to local media outlets (Print, TV, and Radio) on 10/ 19/2026 @ 9:00 a.m. Any posted agenda is subject to change up until 24 hours prior to the date and time of the meeting. A quorum of members from other Village governmental bodies (boards, commissions, and committees) may attend the above-noticed meeting to gather information. Should a quorum be other government bodies are present, this would constitute a meeting pursuant to State ex rel. Badke v. Greendale Village Bd., 173 Wis.2d 553,494 N.W.2d 408 (1993). Wisconsin State Statutes require all agendas for Committee, Commission, or Board meetings be posted in final form, 24 hours prior to the meeting. Any person who has a qualifying disability, as defined by the Americans with Disabilities Act, requiring that meeting or material to be in an accessible location or format, must contact the Weston Municipal Center at 715-359-6114, so any necessary arrangements can be made to accommodate each request. VILLAGE OF WESTON, WISCONSIN OFFICIAL MEETING AGENDA OF THE PARKS AND RECREATION COMMITTEE Parks and Recreation Committee Meeting – Agenda 10/26/2026 TO THE HONORABLE TRUSTEE ERMELING AND FOUR (4) APPOINTED MEMBERS OF THE COMMITTEE: The following items were listed on the agenda in the Village Clerk’ s Office, in accordance with Chapter 2 of the Village’s Municipal Code and will be ready for your consideration at the regular meeting of the Parks and Recreation Committee on Monday, October 26, 2026 @ 4:00 p.m., in the Village Board Room at the Weston Municipal Center, 4747 Camp Phillips Road, Weston, WI 54476. A quorum of members from other Village governmental bodies (boards, commissions, and committees) may/might attend the above-noticed meeting to gather information. Should a quorum of other government bodies be present, this would constitute a meeting pursuant to State ex rel. Badke v. Greendale Village Bd., 173 Wis.2d 553,494 N.W.2d 408 (1993). No official actions other than those of the Parks and Recreation Committee shall take place. Wisconsin State Statutes require all agendas for Committee, Commission, or Board meetings be posted in final form, 24 hours prior to the meeting. Any posted agenda is subject to change up until 24 hours prior to the date and time of the meeting. All items listed on this agenda may be acted upon by the Park Committee. If you are not able to attend in person interested persons may also attend via the zoom link or by phone. Join Zoom Meeting by Computer: https://zoom.us/j/5445915099 Join Zoom Meeting by Phone: +1 312 626 6799 US (Chicago) Meeting ID: 5445915099 AGENDA ITEMS 1. Meeting called to order by Chair Ermeling 2. Pledge of Allegiance to the Flag 3. Roll Call by Recording Secretary Ermeling (C), Lopes Serrao (VC), Esker, Sleeter, Tatro 4. Approval of minutes from the previous meeting: September 28, 2026. 5. Public Comments 6. Written Comments EDUCATIONAL PRESENTATIONS & REPORTS 7. Update on Aquatic Center Repairs. 8. Update on Aquatic Center Season Financials. VILLAGE OF WESTON, WISCONSIN OFFICIAL MEETING AGENDA OF THE PARKS AND RECREATION COMMITTEE Parks and Recreation Committee Meeting – Agenda 10/26/2026 UNFINISHED BUSINESS NEW BUSINESS 9. Discussion and/or action on Machmueller Park Master Plan and Cost Estimate. 10. Discussion and/or action on Kennedy Park Master Plan and Quarterly Update. FUTURE ITEMS 11. Possible next meeting date: November 23, 2026 12. Topics for future meetings 13. Remarks from Staff 14. Remarks from Committee Members 15. Announcements 16. Adjourn This Agenda was posted at the Village Municipal Center, on www.westonwi.gov and transmitted to media partners on October 21, 2026. Village of Weston Parks and Recreation Committee Meeting September 28, 2026 Village of Weston, Wisconsin MEETING MINUTES OF THE PARK & RECREATION COMMITTEE MEETING Monday, September 28, 2026, 4:00 p.m. 1.) Meeting called to order by Chair Ermeling at 4:00 p.m. 2.) Pledge Allegiance to the Flag 3.) Roll Call by Recording Secretary: Jessica Falkowski Member Present Ermeling, Barb (C) YES Esker, Roger YES Lopes Serrao, Luis (VC) ABSENT, EXCUSED Sleeter, Pam YES Tatro, Scott YES Village Staff and other officials in attendance: Falkowski (Clerk), Administrator Gebert, Hodell, Director Osterbrink, Director Wodalski, and Trustee Beck (online). 4.) Approval of minutes from the previous meeting: August 24, 2026. *M/S/P: Tatro/Esker: to approve August 24, 2026, minutes. Yes Votes: 4 No Votes: 0 Abstain: 0 Not Voting: 1 Result: Pass Member Vote Ermeling, Barb YES Esker, Roger YES Lopes Serrao, Luis ------ Sleeter, Pam YES Tatro, Scott YES 5.) Public Comments Grace Klopotek, 6003 Jessica St Weston made the following comments: • Thanked the Committee for asking questions on the ice rink proposal at Kennedy presented last month • Asked if the Friends of Kennedy Park could put together a presentation showing: o Where they are at o Where they plan to go o How they plan to get there • Provide more details on Prohaska Park 6.) Written Comments. None Village of Weston Parks and Recreation Committee Meeting September 28, 2026 EDUCATIONAL PRESENTATIONS & REPORTS 7.) Update on the Kennedy Park Renovation Director Osterbrink stated that the update is brief but, staff and Friends of Kennedy Park does provide quarterly updates that are more detailed. Director Osterbrink contacted the contractors to complete the following: • the touch up paint on the poles – week of October 5 • concrete touch ups on the cracked block and missing mortar - week of October 5 • dugout door adjustments – no date set • dirt/sod repair where irrigation leak was detected and fixed – no date set • lights are scheduled to be delivered and installed the week of October 19 8.) Update on Machmueller Park Master Plan. Director Osterbrink stated a public input meeting was held September 3 at Machmueller Park. The consultant took the information that was collected from residents and park users that attended the meeting and revised the concept plan. The newly revised plan includes adding a tennis and basketball courts along with a small shade structure at that location - #14 on the master plan. Director Osterbrink did receive three emails about adding an additional all-access playground to the park. The information was passed onto the consultant. Tatro supports the suggestion to add an all-access playground. Director Osterbrink stated that in 2008 the Village had a concept design completed for an all-access playground but the funding fell through. Trustee Ermeling asked if the current playground was replaced in 2024 when all the other playgrounds were replaced. Director Osterbrink responded no, the playground was installed in 2007 and is still in good shape. The current playground is proposed to be updated in the future on the concept plan - #5. Trustee Ermeling also stated that if the proposed tennis court is under-utilized it can easily be transformed into pickleball courts. Director Osterbrink included four different types of bandshells in the packet. 9.) Update on Aquatic Center Repairs Director Osterbrink stated he was contacted by the contractor and they are due to arrive the week of October 5 to start working on the plumbing, motor/pump replacements and the leak detection. Once the work is completed, staff can winterize the pool vessel and building. Village of Weston Parks and Recreation Committee Meeting September 28, 2026 Director Osterbrink has been working on the electrical and commercial pool permits for the project from the Village. The plan has been approved by the State. UNFINISHED BUSINESS 10.) Discussion and/or action on completing an updated Farmers Market End of Season survey. Director Osterbrink stated we are almost at the end of the season for the Farmers Market. Does the Committee want to recommend staff to send out an updated survey for vendors and customers to collect feedback? The first survey was conducted three to four weeks into the season which, everything was new to everyone. At that time, many people still did not realize the location was moved to Kennedy Park and everyone had to learn the layout and parking. Staff stated that adjustments were made as issues/concerns arose. For example, staff addressed the parking issues, traffic control, and fixed the pothole. Administrator Gebert stated the survey would run for 30 days, October 1- October 30. Committee members stated that the following should be included in the survey: • What people liked or did not like • Suggestions of what people would like to see • What could we do better • Survey the vendors Hodell made the following comments: • Vendors like the new location because the area is larger so they can have their vehicle and/or trailer at their spot. This is an asset when the weather is not cooperative and when they need to restock or load up at the end of the day • Customers like array of vendors and things offered for purchase • Once the roundabout opened the traffic flow improved and customers started parking more in the parking lot • Customers commented more positively as the season went on as issues were addressed, they became more accustomed to the site, and as more vendors came with product • Ten more vendors participated in this season’s market due to the larger location • Customers can drive up to certain vendors, for example – vendors that sell pumpkins or mums. The customers don’t have to carry their purchase across the market to their vehicle, making it more convenient • Hodell takes left over produce that is still fresh from vendors to Neighbor’s Place on Tuesdays. On Wednesdays, the Neighbor’s Place has a food pantry day • Hsu’s Growing Supply provides compost bins that vendors can dispose of produce that is no longer fresh. Sleeter stated that the Farmers Market became more organized and easier to get around as the weeks went on. Village of Weston Parks and Recreation Committee Meeting September 28, 2026 Trustee Beck added that the survey should be available now because things are fresh in people’s minds. *M/S/P Tatro/Sleeter: motion to proceed with the updated Farmers Market Survey for vendors and customers to complete this fall. Yes Votes: 4 No Votes: 0 Abstain: 0 Not Voting: 1 Result: Pass Member Vote Ermeling, Barb YES Esker, Roger YES Lopes Serrao, Luis ------ Sleeter, Pam YES Tatro, Scott YES 11.) Discussion and/or action on collecting feedback regarding Ice Skating Rinks at Kennedy. Director Osterbrink stated that a discussion was held in March and April about the use and costs to maintain the outdoor ice rink at Kennedy Park. The discussion also included whether a survey should be conducted this fall during the election. The following would be stated on an easel in the hallway asking voters to check yes or no to an outdoor skating rink at Kennedy Park as they pass by. Committee discussed that not enough information would be given to voters to make an informative decision if the question was placed on the easel to check yes or no. The Committee would like a tenth question added to the Famers Market survey – How else do you utilize Kennedy Park. 12.) Discussion and/or action on completing an updated Aquatic Center Evaluation. Director Osterbrink stated that the past couple months, discussions have taken place on the annual operating and capital costs at the Aquatic Center. The Village spent $102,000 earlier this year in leak detection and repairs. This fall the motors and valves will be replaced for $100,000 plus and an estimated $12,000 is projected for leak detection. Aquatic Center evaluation was completed in 2016 which provided the Village with a list of recommended items to upgrade or fix. Over the years majority of the items have been completed. Since the evaluation is 10 years old, a trustee suggested that another evaluation should be done. Trustee Ermeling commented that maybe we should see what the school district decides and if there is a possible joint venture with them. Village of Weston Parks and Recreation Committee Meeting September 28, 2026 Tatro suggested that if we have an evaluation completed on our pool that could help us decide if a possible venture with the school district would be a better investment. Staff provided an estimated cost of $7,000 - $12,000 for the pool evaluation to be completed. Water Technology completed the evaluation in 2016 and the evaluation includes the pool vessel and the mechanicals. Director Osterbrink stated the items that have not been upgraded or replaced have been sidelined due to the leaks we have had to fix the past couple of years. The leak detection this fall is to detect a leak that is in the supply line for the play structure. The pool was opened in 1999 making the pool 27 years old. *M/S/P Tatro/Esker: motion to recommend approval to complete a new aquatic center evaluation due to the fact that the current evaluation is 10 years old and may help in a decision to partner with another entity. Yes Votes: 4 No Votes: 0 Abstain: 0 Not Voting: 1 Result: Pass Member Vote Ermeling, Barb YES Esker, Roger YES Lopes Serrao, Luis ------ Sleeter, Pam YES Tatro, Scott YES 13.) Possible next meeting date: October 26, 2026, at 4p.m. 14.) Topics for future meetings a.) Update on Aquatic Center – final numbers for the season 15.) Remarks from Staff Director Osterbrink stated he had a report in the packet. Staff should be receiving the warranty items to replace the broken parts on the spinner at Sandhill Park within the next couple of weeks. Work has been completed for the original list of items to be completed at the playgrounds. The Village will be issuing the final payment to the installation company. Director Wodalski added that through the current discussions and decisions that have occurred about keeping the Farmers Market at Kennedy Park and what potentially could happen with the hockey group will change the outlook of the master plan. The next step would be to look at the park layout with the Farmers Market now included and see how to adjust the baseball field that was mapped to go there. The goal is to make a park that fits all users and age groups. 16.) Remarks from Committee Members Village of Weston Parks and Recreation Committee Meeting September 28, 2026 None 17.) Announcements Community Engagement night at the municipal center from 4-6p.m. 18.) Adjourn *M/S/P Tatro/Esker: motion to adjourn the meeting at 5:02 p.m. Yes Votes: No Votes: 0 Abstain: 0 Not Voting: 0 Result: Pass Member Vote Ermeling, Barb YES Esker, Roger YES Lopes Serrao, Luis ------ Sleeter, Pam YES Tatro, Scott YES Jessica Falkowski, Recording Secretary REQUEST FOR CONSIDERATION REQUEST FOR CONSIDERATION Public Mtg/Date: Parks and Recreation Committee – October 26, 2026 Description: Update on the Aquatic Center Repairs From: Shawn Osterbrink, Director of Parks, Recreation & Forestry Question: Update on the work at the Aquatic Center. Background Neuman Pools has been on site since October 8th. They have been working on the removal of the old equipment and installation of the pumps, motors and valves. They are currently waiting for some risers that stalled work on this project, so they moved on to leak detection of the play structure supply pipe. Fortunately, after some testing they were able to find the leak on Monday, October 19th. Attached Docs: None. ______________________________________________________________________ Committee Action: None. Fiscal Impact: None. Recommendation: None. Recommended Language for Official Action None, update item. ______________________________________________________________________ Additional action: REQUEST FOR CONSIDERATION REQUEST FOR CONSIDERATION Public Mtg/Date: Parks and Recreation Committee – October 26, 2026 Description: Update on the Aquatic Center Financials for 2026 From: Shawn Osterbrink, Director of Parks, Recreation & Forestry Question: Update on the financial for the Aquatic Center 2026 season. Background Attached is the budget status report for the Aquatic Center through September 30th, 2026. Just a reminder that expenses will still occur through the end of the year for utilities and miscellaneous work that needs to be completed as we winterize the facility and make repairs. There also may be some additional revenue added as we were waiting for payment from some of the groups, we billed this season. Based on the report we are showing revenues of $246,650.75 and we had budgeted revenues of $226,870.00. We are showing expenditures of $230,587.41 and had budgeted $256,060.00 for expenditures. Based on what was budgeted we expected to be up to $29,190.00 in revenue below expenditures. Currently we are showing a positive of $16,063.34 of revenue over expenditures. Attached Docs: Budget Status Report through September 30th, 2026. ______________________________________________________________________ Committee Action: None. Fiscal Impact: None. Recommendation: None. Recommended Language for Official Action None, update item. ______________________________________________________________________ Additional action: VILLAGE OF WESTON REVENUES WITH COMPARISON TO BUDGET FOR THE 9 MONTHS ENDING SEPTEMBER 30, 2026 AQUATIC CENTER FUND ACCOUNT NO ACCOUNT TITLE PERIOD ACTUAL YTD ACTUAL BUDGET UNEARNED PCNT FOR ADMINISTRATION USE ONLY 75 % OF THE FISCAL YEAR HAS ELAPSED 10/12/2026 03:25PM PAGE: 1 TAXES 22-00-41110-000-000 PROPERTY TAXES .00 40,000.00 40,000.00 .00 100.0 TOTAL TAXES .00 40,000.00 40,000.00 .00 100.0 PUBLIC CHARGES FOR SERVICE 22-00-46734-000-045 SWIM FEE-JOINT MEMBERSHIP .00 12,090.99 13,000.00 909.01 93.0 22-00-46734-000-051 SWIM FEES-DAILY .00 113,486.25 100,000.00 ( 13,486.25) 113.5 22-00-46734-000-061 SWIM FEES-LOCKER RENTALS 31.99 31.99 70.00 38.01 45.7 22-00-46734-000-062SWIM FEES-POOL RENTALS/EVENING .00 3,824.64 2,000.00 ( 1,824.64) 191.2 22-00-46734-000-063SWIM FEES-GROUP RATE DISCOUNT/ .00 4,366.83 2,500.00 ( 1,866.83) 174.7 22-00-46734-000-064 SWIM FEES-B/DAY PARTY/DAILY FE .00 1,327.94 1,200.00 ( 127.94) 110.7 22-00-46734-000-065 SWIM FEES-B/DAY PARTY/CONCESSI .00 2,655.91 .00 ( 2,655.91) .0 22-00-46734-000-066 SWIM FEES-CONCESS DIRECT FROM .00 6,699.69 7,000.00 300.31 95.7 22-00-46734-000-074 SWIM FEES-WAC ONLY MEMBERSHIP .00 17,409.43 17,000.00 ( 409.43) 102.4 22-00-46735-000-071 SWIM LESSONS .00 2,519.24 4,000.00 1,480.76 63.0 TOTAL PUBLIC CHARGES FOR SERVICE 31.99 164,412.91 146,770.00 ( 17,642.91) 112.0 MISCELLANEOUS REVENUE 22-00-48110-001-000 INTEREST-INVESTMENTS 116.32 1,737.84 100.00 ( 1,637.84) 1737.8 22-00-48502-000-067POOL DONATIONS-PEPSI/COKE DON .00 500.00 .00 ( 500.00) .0 TOTAL MISCELLANEOUS REVENUE 116.32 2,237.84 100.00 ( 2,137.84) 2237.8 TRANSFERS IN 22-00-49229-000-000TRANSFER FROM ROOM TAXES FUN .00 40,000.00 40,000.00 .00 100.0 TOTAL TRANSFERS IN .00 40,000.00 40,000.00 .00 100.0 TOTAL FUND REVENUE 148.31 246,650.75 226,870.00 ( 19,780.75) 108.7 VILLAGE OF WESTON EXPENDITURES WITH COMPARISON TO BUDGET FOR THE 9 MONTHS ENDING SEPTEMBER 30, 2026 AQUATIC CENTER FUND PERIOD ACTUAL YTD ACTUAL BUDGET UNEXPENDED PCNT FOR ADMINISTRATION USE ONLY 75 % OF THE FISCAL YEAR HAS ELAPSED 10/12/2026 03:25PM PAGE: 2 REC FACIL-AQUATIC CENTER 22-05-55420-221-000 WATER/SEWER/STORMWATER .00 6,904.38 12,000.00 5,095.62 57.5 22-05-55420-222-000 ELECTRICITY 4,029.38 12,907.84 14,500.00 1,592.16 89.0 22-05-55420-224-000 NATURAL GAS 6,271.40 12,628.27 15,000.00 2,371.73 84.2 22-05-55420-225-000 TELEPHONE .00 .00 1,100.00 1,100.00 .0 22-05-55420-247-000 REPAIRS/MAINT-BUILDINGS .00 23,223.42 30,000.00 6,776.58 77.4 22-05-55420-279-000 STATE INSPECTION FEES .00 2,487.00 2,200.00 ( 287.00) 113.1 22-05-55420-286-000 CREDIT CARD MAINTENANCE FEES .00 48.00 .00 ( 48.00) .0 22-05-55420-290-000OTHER OUTSIDE CONTRACTED SER 46,954.83 148,327.80 144,575.00 ( 3,752.80) 102.6 22-05-55420-310-000 OFFICE SUPPLIES .00 .00 75.00 75.00 .0 22-05-55420-312-000 OUTSIDE PRINTING/STATIONERY & 74.00 153.50 160.00 6.50 95.9 22-05-55420-314-000 SMALL EQUIPMENT 469.61 469.61 1,750.00 1,280.39 26.8 22-05-55420-326-000 ADVERTISING .00 .00 500.00 500.00 .0 22-05-55420-344-000 OPERATING SUPPLIES-JANITORIAL/ .00 1,031.44 1,800.00 768.56 57.3 22-05-55420-346-000 OPERATING SUPPLIES-CLOTHING/UN .00 1,127.07 1,800.00 672.93 62.6 22-05-55420-366-000 OTHER SUPPLIES-CHEMICALS .00 19,352.23 25,000.00 5,647.77 77.4 22-05-55420-390-000 OTHER SUPPLIES-ALL OTHER SUPPL .00 624.19 1,500.00 875.81 41.6 22-05-55420-398-000OTHER SUPPLIES-CASH OVER OR S .00 162.91 .00 ( 162.91) .0 22-05-55420-808-000 COMPUTER SOFTWARE .00 1,139.75 1,600.00 460.25 71.2 22-05-55420-812-000 CAPITAL EQUIP-FURNITURE & FURN .00 .00 2,500.00 2,500.00 .0 TOTAL REC FACIL-AQUATIC CENTER 57,799.22 230,587.41 256,060.00 25,472.59 90.1 TOTAL FUND EXPENDITURES 57,799.22 230,587.41 256,060.00 25,472.59 90.1 NET REVENUE OVER EXPENDITURES ( 57,650.91) 16,063.34 ( 29,190.00) ( 45,253.34) 55.0 REQUEST FOR CONSIDERATION REQUEST FOR CONSIDERATION Public Mtg/Date: Parks and Recreation Committee – October 26, 2026 Description: Machmueller Park Master Plan and Cost Estimate From: Shawn Osterbrink, Director of Parks, Recreation & Forestry Question: Should the park committee recommend approval of the Machmueller Park Master Plan and Cost Estimate. Background Attached is the most recent version of the Machmueller Park Master Plan and Cost Estimate for the improvements at the park. All requested changes and input f rom the committee and public was considered for the plan. Attached Docs: Machmueller Concept Plan and Cost Estimate. ______________________________________________________________________ Committee Action: None. Fiscal Impact: N/A Recommendation: Approve the Master Plan and Cost Estimate. Recommended Language for Official Action I recommend approval/denial of the Machmueller Park Master Plan and Cost Estimate, Or something else. ______________________________________________________________________ Additional action: PRELIMINARY COST ESTIMATE MACHMUELLER PARK Weston, Wisconsin Park Redevelopment Project Rettler Project No.: 26.027 Item Estimated Unit Category No. Item Description Units Quantity Price Extension Sub T otal $580,410.00 1. Mobilization L.S. 1 $260,000.00 $260,000.00 2. General Demolition L.S. 1 $15,000.00 $15,000.00 3. Common Excavation, 12-inch depth C.Y. 10,500 $12.00 $126,000.00 4. Stripping Topsoil, 6-inch depth C.Y. 10,500 $2.50 $26,250.00 5. Excavation below Subgrade with 12" Breaker Run (25% of asphalt and large concrete area surfaces) C.Y. 750 $45.00 $33,750.00 6. Place Screened Topsoil, 6-inch dpeth C.Y. 6,475 $2.25 $14,570.00 7. Seed/Fertilize/Mulch Common Green Space S.F. 174,67 5 $0.50 $87,340.00 8. Erosion Control L.S. 1 $15,000.00 $15,000.00 9. Tracking Pad EACH 1 $2,500.00 $2,500.00 WALKING PATHS $90,000.00 10. Kafka Wax Coated Aggregate L.S. 1 $90,000.00 $90,000.00 Note: Aggrate is only for new paths. Does not include reinstalling existing paths. RESTROOM FACIILTY AND GATHERING PLAZA $1,173,810.00 11. 5" Concrete S.F. 13,990 $9.00 $125,910.00 12. Dense Graded Base, 6-inch depth S.Y. 1,710 $7.00 $11,970.00 13. Precast Concrete Bag Toss Boards SET 2 $3,000.00 $6,000.00 14. Water Utility L.F. 360 $60.00 $21,600.00 15. Sanitary Sewer Utility L.F. 360 $65.00 $23,400.00 16. Electric Service (For Food Truck Hookup) L.S. 1 $20 ,000.00 $20,000.00 17. 20' x 30' Poligon Band Shell L.S. 1 $320,000.00 $320 ,000.00 18. 5" Concrete (Band Shell) S.F. 500 $9.00 $4,500.00 19. Dense Graded Base, 6-inch depth (Band Shell) S.Y. 61 $7.00 $430.00 20. Restroom/Storage/Rental Building S.F. 1,600 $400.00 $640,000.00 TEEN PLAYGROUND $379,920.00 21. 12" x 12" Reinforced Concrete Curb (with base) L.F. 380 $45.00 $17,100.00 22. Poured-in-Place Surfacing & Base Aggregate Dense S.F. 5,815 $28.00 $162,820.00 23. Playground Equipment Allowance L.S. 1 $200,000.00 $2 00,000.00 TODDLER PLAYGROUND $571,690.00 24. 12" x 12" Reinforced Concrete Curb (with base) L.F. 570 $45.00 $25,650.00 25. Poured-in-Place Surfacing & Base Aggregate Dense S.F. 9,200 $28.00 $257,600.00 26. Playground Equipment Allowance L.S. 1 $250,000.00 $2 50,000.00 27. 5" Concrete S.F. 4,340 $8.00 $34,720.00 28. Dense Graded Base, 6-inch depth S.Y. 530 $7.00 $3,720.00 October 1, 2026 EARTHWORK/DEMOLITION/CONTRACTOR MOBILIZATION Page 1 of 3 PRELIMINARY COST ESTIMATE MACHMUELLER PARK Weston, Wisconsin Park Redevelopment Project Rettler Project No.: 26.027 Item Estimated Unit Category No. Item Description Units Quantity Price Extension Sub T otal October 1, 2026 OUTDOOR FITNESS SPACE $213,250.00 29. 12" x 12" Reinforced Concrete Curb (with base) L.F. 120 $45.00 $5,400.00 30. Synthetic Playground Turf S.F. 4,535 $25.00 $113,380 .00 31. Synthetic Turf - Base Drainage Stone, 6-inch dep th S.Y. 504 $8.00 $4,040.00 32. Flat Panel Underdrain 1"x12" L.F. 280 $6.00 $1,680.0 0 33. 6" Storm Sewer L.F. 75 $50.00 $3,750.00 34. Fitness Equipment Allowance L.S. 1 $85,000.00 $85,00 0.00 PLAYING COURTS (1 TENNIS, 4 PICKLEBALL, 1 BASKETBALL) $303,740.00 35. Hot Mixed Asphalt, 3.5-inch depth S.Y. 500 $28.00 $14,000.00 36. Dense Graded Base, 10-inch depth S.Y. 550 $12.00 $6,600.00 37. Sawcut Asphalt Joints L.F. 500 $5.00 $2,500.00 38. 5" Concrete S.F. 6,930 $9.00 $62,370.00 39. Dense Graded Base, 6-inch depth S.Y. 847 $7.00 $5,930.00 40. Court Surfacing and Striping (Pickleball, Tennis, and Basketball) S.Y. 2,215 $24.00 $53,160.00 41. Tennis Court Netting (Posts, Net, Center Anchor Strap) SET 1 $2,500.00 $2,500.00 42. Pickleball Court Netting (Posts, Net, Center Anc hor Strap) SET 4 $2,000.00 $8,000.00 43. Basketball Hoop EACH 2 $10,000.00 $20,000.00 44. 4' High Black Vinyl Chain Link Fencing L.F. 510 $40 .00 $20,400.00 45. 4'H x 4'W Black Vinyl Chain Link Gate EACH 5 $1,000 .00 $5,000.00 46. 10' High Black Vinyl Chain Link Fencing L.F. 340 $5 5.00 $18,700.00 47. 4" Underdrain L.F. 890 $22.00 $19,580.00 48. Shade Structure - 16'x16' L.S. 1 $55,000.00 $55,000.00 49. Benches and Spectator Seating Allowance L.S. 1 $10,000.00 $10,000.00 EXISTING PARKING LOT AND DRIVE $49,000.00 50. Crack Fill and Sealcoat S.Y. 7,655 $6.00 $46,000.00 51. Striping L.S. 1 $3,000.00 $3,000.00 Page 2 of 3 PRELIMINARY COST ESTIMATE MACHMUELLER PARK Weston, Wisconsin Park Redevelopment Project Rettler Project No.: 26.027 Item Estimated Unit Category No. Item Description Units Quantity Price Extension Sub T otal October 1, 2026 NEW PARKING LOT $59,730.00 52. Hot Mixed Asphalt, 3.5-inch depth S.Y. 1,230 $28.00 $34,440.00 53. Dense Graded Base, 10-inch depth S.Y. 1,353 $12.00 $16,240.00 54. Concrete Curb Ramp w/ Detectable Warning Field EACH 1 $1,800.00 $1,800.00 55. Striping & Signs L.S. 1 $2,000.00 $2,000.00 56. 24" Curb and Gutter L.F. 150 $35.00 $5,250.00 SITE AMENITIES $115,000.00 57. Site Landscaping Allowance L.S. 1 $50,000.00 $50,000.00 58. Signage Allowance L.S. 1 $10,000.00 $10,000.00 59. Site Amenities Allowance (benches, trash recepta cles, plaza seating, etc.) L.S. 1 $20,000.00 $20,000.00 60. Stormwater Management Allowance L.S. 1 $35,000.00 $3 5,000.00 SUMMARY CONSTRUCTION ITEMS TOTAL: $3,536,550.00 CONTINGENCY at 10%: $353,655.00 CONSTRUCTION ESTIMATE SUBTOTAL: $3,890,205.00 SOFT COSTS $247,560.00 CONSTRUCTION ESTIMATE TOTAL $4,137,765.00 NOTES: Geotechnical study not completed at time of study. Soil conditions may impact cost estimate. Topographic Survey not completed at time of study. Final existing base map may impact cost estimate. Page 3 of 3 REQUEST FOR CONSIDERATION REQUEST FOR CONSIDERATION Public Mtg/Date: Park and Recreation Committee, October 26, 2026 Description: Update on the Kennedy Park Renovation and Capital Campaign From: Jami Gebert, Village Administrator Michael Wodalski, Director of Public Works Shawn Osterbrink, Director of Parks, Recreation and Forestry Question: Update on the implementation of the master plan for Kennedy Park and capital fundraising campaign. Background Construction/Renovation: There are still a few items that need to be completed. There is some touch up painting, concrete work and a couple other items. The doors in the dugouts were recently adjusted, and an irrigation leak we found has been repaired, all under warranty. A walk through will be completed with the contractor and engineering firm. The Village, on behalf of the Friends of Kennedy Park (FoKP), has been in contact with Musco Lighting to complete the field lighting on Rajek Field. The lights have been delivered and installed as of October 20th. The Village’s role is to coordinate the construction effort as those items will become Village Property, while the FoKP, through the Community Foundation, will then make the payments for the lighting. Capital Campaign: Youth baseball board donated $17,500 to the Kennedy Park Project in September. Almost $4000 in concession stand money coming from a joint effort in the softball tournament. Softball folks agreed to use our inventory proceeds went to the project. This would increase the balance of $103,439.55 from July at the Community Foundation to approximately $124,939.55, which $98,000.00 will be spent on the lights on Rajek Field. The second Glow games are set and open on our website for February 20th, 2027. We have just started organizing again but already have verbal commitments from excited teams and invested business alike. https://www.dceyouthbaseball.org/tournaments/glow-games/27118 We'll have a clean-up day this Sunday to work on collecting equipment, taking down banners, and cleaning out the sheds. Travel baseball numbers are in for 2027, and we have a 30% increase in kids this year. I'm positive the improvements to the park and the excitement around the program has helped extend our reach. Baseball is working on scheduling three tournaments for next summer along with softball having one. Also, with the decision to keep the Farmer’s Market at Kennedy there is a need to revisit the master plan and determine what the next goal will be. Master Plan: Since the Farmers Market is going to remain at Kennedy Park it was discussed that the master plan needs to be reviewed as the master plan shows a baseball field in that location. The approved master plan has been included for review and discussion. REQUEST FOR CONSIDERATION REQUEST FOR CONSIDERATION Figure 1: Drone Image of Rajek Field and the Babe Ruth Field during the June Youth Baseball Tournament Attached Docs: Kennedy Park Master Plan and Cost Estimate. Committee Action: None. Fiscal Impact: None. Recommendation: None. Recommended Language for Official Action PRELIMINARY COST ESTIMATE Kennedy Park Master Plan Weston, Wisconsin Park Facility Redevelopment Rettler Project No.: 22.062 Item Estimated Category No. Item Description Units Quantity Unit Price Extension Sub Total $1,462,600.00 1. Mobilization L.S. 1 $725,000.00 $725,000.00 2. Clearing and Grubbing L.S. 1 $10,000.00 $10,000.00 3. General Demolition L.S. 1 $50,000.00 $50,000.00 4. Common Excavation, 12-inch depth C.Y. 35,400 $8.00 $283,200.00 5. Strip Topsoil, 6-inch depth S.Y. 91,425 $1.00 $91,425.00 6. Place Screened Topsoil, 6-inch depth S.Y. 37,309 $3.00 $111,926.67 7. Excavation below Subgrade Allowance (25% of asphalt surface) S.Y. 3,600 $15.00 $54,000.00 8. Seed/Fertilize/Mulch Common Green Space S.F. 335,780 $0.35 $117,523.00 9. Erosion Control L.S. 1 $15,000.00 $15,000.00 10. Tracking Pad EACH 3 $1,500.00 $4,500.00 $745,600.00 11. Stormwater Management Allowance L.S. 1 $150,000.00 $150,000.00 12. Storm Sewer L.F. 3,000 $55.00 $165,000.00 13. Storm Control Structure EACH 5 $4,500.00 $22,500.00 14. Storm Basin EACH 30 $3,000.00 $90,000.00 15. Storm Endwall EACH 5 $1,500.00 $7,500.00 16. Site Electrical & Service Allowance L.S. 1 $250,000.00 $250,000.00 17. Street Cut & Utility Connection L.S. 1 $20,000.00 $20,000.00 18. Sanitary Utility Allowance L.F. 312 $65.00 $20,280.00 19. Water Utility Allowance L.F. 312 $65.00 $20,280.00 BASEBALL FIELD 1 (315'/350'/315') (SYNTHETIC INFIELD) $1,406,800.00 20. Remove Topsoil from Infield Area (8" depth) S.Y. 3,882 $1.50 $5,822.78 21. Synthetic Turf w/ Field Markings (infield) S.F. 34,937 $6.00 $209,620.23 22. Synthetic Turf - Finish Drainage Stone, 2" depth S.Y. 3,882 $6.00 $23,291.14 23. Synthetic Turf - Base Drainage Stone, 6" depth S.Y. 3,882 $12.00 $46,582.27 24. Geotextile Fabric S.Y. 3,882 $2.50 $9,704.64 25. 12" x 12" Concrete Curb and Nailer (with base course) L.F. 715 $35.00 $25,025.00 26. Flat Panel Underdrain 1"x12" L.F. 1,500 $12.00 $18,000.00 27. 12" HDPE Perforated Socked Storm Pipe w/clear Stone Trench and End Caps L.F. 600 $90.00 $54,000.00 28. 48" Concrete Manhole EACH 3 $4,500.00 $13,500.00 29. Turf Utility Boxes EACH 2 $2,000.00 $4,000.00 30. Baseball Pitching Rubber & Home Plate W/ Concrete Foundations, Synthetic Turf SET 1 $4,500.00 $4,500.00 31. Baseball Bases w/ Concrete Foundations, Synthetic Turf SET 1 $2,000.00 $2,000.00 32. Turf Maintenance Equipment LS 1 $30,000.00 $30,000.00 33. Warning Track Material (6" depth) S.Y. 1,056 $25.00 $26,400.00 34. Underdrain L.F. 1,800 $25.00 $45,000.00 35. Topsoil Amendment S.Y. 9,025 $10.00 $90,250.00 36. Athletic Field Seeding S.F. 81,225 $0.50 $40,612.50 37. Irrigation EACH 1 $18,000.00 $18,000.00 38. 24' Backstop, Black Vinyl Coated L.S. 1 $40,000.00 $40,000.00 39. Fence, Black Vinyl Coated Chain Link, 8-foot high L.F. 1,260 $65.00 $81,900.00 40. Fence Gate, Black Vinyl Coated Chain Link, 4' W 8' H EACH 7 $2,500.00 $17,500.00 41. Fence Gate, Black Vinyl Coated Chain Link, 12' W x 8' H EACH 2 $4,000.00 $8,000.00 November 7, 2023 EARTHWORK / DEMOLITION UTILITIES 42. Foul Poles SET 1 $12,000.00 $12,000.00 43. Dugout - CMU Masonry L.S. 1 $75,000.00 $75,000.00 44. Dugout with 7'x8' Storage Area - CMU Masonry L.S. 1 $90,000.00 $90,000.00 45. Scoreboard EACH 1 $30,000.00 $30,000.00 46. Electrical Allowance L.S. 1 $30,000.00 $30,000.00 47. Lighting Allowance L.S. 1 $300,000.00 $300,000.00 48. 5-Row Bleachers (52 seats) SET 3 $10,000.00 $30,000.00 49. Batting Cage/Bull Pens EACH 2 $13,000.00 $26,000.00 $1,034,600.00 50. Infield Material (6" depth) S.Y. 1,887 $25.00 $47,175.00 51. Warning Track Material (6" depth) S.Y. 992 $25.00 $24,800.00 52. Underdrain L.F. 2,360 $25.00 $59,000.00 53. Topsoil Amendment S.Y. 9,768 $10.00 $97,683.96 54. Athletic Field Seeding S.F. 87,916 $0.50 $43,957.78 55. Irrigation EACH 1 $40,000.00 $40,000.00 56. Pitcher's Mound/Bases SET 1 $4,500.00 $4,500.00 57. 24' Backstop, Black Vinyl Coated L.S. 1 $40,000.00 $40,000.00 58. Fence, Black Vinyl Coated Chain Link, 8-foot high L.F. 1,215 $65.00 $78,975.00 59. Fence Gate, Black Vinyl Coated Chain Link, 4' W 8' H EACH 7 $2,500.00 $17,500.00 60. Fence Gate, Black Vinyl Coated Chain Link, 12' W x 8' H EACH 2 $4,000.00 $8,000.00 61. Foul Poles SET 1 $12,000.00 $12,000.00 62. Dugout - CMU Masonry L.S. 1 $75,000.00 $75,000.00 63. Dugout with 7'x8' Storage Area - CMU Masonry L.S. 1 $90,000.00 $90,000.00 64. Scoreboard EACH 1 $30,000.00 $30,000.00 65. Electrical Allowance L.S. 1 $10,000.00 $10,000.00 66. Lighting Allowance L.S. 1 $300,000.00 $300,000.00 67. 5-Row Bleachers (52 seats) SET 3 $10,000.00 $30,000.00 68. Batting Cage/Bull Pens EACH 2 $13,000.00 $26,000.00 $641,900.00 69. Infield Material (6" depth) S.Y. 1,613 $25.00 $40,325.00 70. Warning Track Material (6" depth) S.Y. 678 $25.00 $16,950.00 71. Underdrain L.S. 1 $25,000.00 $25,000.00 72. Topsoil Amendment S.Y. 3,157 $10.00 $31,572.22 73. Athletic Field Seeding S.F. 28,415 $0.50 $14,207.50 74. Irrigation EACH 1 $25,000.00 $25,000.00 75. Pitcher's Mound/Bases SET 1 $4,500.00 $4,500.00 76. 24' Backstop, Black Vinyl Coated L.S. 1 $30,000.00 $30,000.00 77. Fence, Black Vinyl Coated Chain Link, 8-foot high L.F. 735 $65.00 $47,775.00 78. Fence Gate, Black Vinyl Coated Chain Link, 4' W 8' H EACH 5 $2,500.00 $12,500.00 79. Fence Gate, Black Vinyl Coated Chain Link, 12' W x 8' H EACH 2 $4,000.00 $8,000.00 80. Foul Poles SET 1 $12,000.00 $12,000.00 81. Gameshade Dugout w/ 8' Vinyl Fencing EACH 2 $20,000.00 $40,000.00 82. Concrete Dugout Pads and Base Course EACH 2 $10,000.00 $20,000.00 83. Scoreboard EACH 1 $20,000.00 $20,000.00 84. Electrical Allowance L.S. 1 $10,000.00 $10,000.00 85. Lighting Allowance L.S. 1 $260,000.00 $260,000.00 86. 3-Row Bleachers (32 seats) SET 3 $8,000.00 $24,000.00 SOFTBALL FIELD 1 (220') (NATURAL TURF) BASEBALL FIELD 2 (315'/315'/315') (NATURAL TURF) $808,600.00 87. Remove Topsoil from Infield Area (8" depth) S.Y. 1,613 $1.50 $2,419.17 88. Synthetic Turf w/ Field Markings (infield) S.F. 14,515 $6.00 $87,090.00 89. Synthetic Turf - Finish Drainage Stone, 2" depth S.Y. 1,613 $6.00 $9,676.67 90. Synthetic Turf - Base Drainage Stone, 6" depth S.Y. 1,613 $12.00 $19,353.33 91. Geotextile Fabric S.Y. 1,613 $2.50 $4,031.94 92. 12" x 12" Concrete Curb and Nailer (with base course) L.F. 455 $35.00 $15,925.00 93. Flat Panel Underdrain 1"x12" L.F. 1,500 $12.00 $18,000.00 94. 12" HDPE Perforated Socked Storm Pipe w/clear Stone Trench and End Caps L.F. 600 $90.00 $54,000.00 95. 48" Concrete Manhole EACH 3 $4,500.00 $13,500.00 96. Turf Utility Boxes EACH 2 $2,000.00 $4,000.00 97. Softball Pitching Rubber & Home Plate W/ Concrete Foundations, Synthetic Turf SET 1 $4,500.00 $4,500.00 98. Softball Bases w/ Concrete Foundations, Synthetic Turf SET 1 $2,000.00 $2,000.00 99. Warning Track Material (6" depth) S.Y. 678 $25.00 $16,950.00 100. Underdrain L.S. 1 $17,000.00 $17,000.00 101. Topsoil Amendment S.Y. 3,157 $10.00 $31,572.22 102. Athletic Field Seeding S.F. 28,415 $0.50 $14,207.50 103. Irrigation EACH 1 $10,000.00 $10,000.00 104. 24' Backstop, Black Vinyl Coated L.S. 1 $30,000.00 $30,000.00 105. Fence, Black Vinyl Coated Chain Link, 8-foot high L.F. 735 $65.00 $47,775.00 106. Fence Gate, Black Vinyl Coated Chain Link, 4' W 8' H EACH 5 $2,500.00 $12,500.00 107. Fence Gate, Black Vinyl Coated Chain Link, 12' W x 8' H EACH 2 $4,000.00 $8,000.00 108. Foul Poles SET 1 $12,000.00 $12,000.00 109. Gameshade Dugout w/ 8' Vinyl Fencing EACH 2 $20,000.00 $40,000.00 110. Concrete Dugout Pads and Base Course EACH 2 $10,000.00 $20,000.00 111. Scoreboard EACH 1 $20,000.00 $20,000.00 112. Electrical Allowance L.S. 1 $10,000.00 $10,000.00 113. Lighting Allowance L.S. 1 $260,000.00 $260,000.00 114. 3-Row Bleachers (32 seats) SET 3 $8,000.00 $24,000.00 $147,800.00 115. Concrete, 5-inch depth S.F. 18,810 $7.00 $131,670.00 116. Dense Graded Base Course, 6-inch depth (under concrete) S.Y. 2,299 $7.00 $16,093.00 $800,000.00 117. Concession/Restroom/Scorers Booth S.F. 1,600 $500.00 $800,000.00 WALK CONNECTIONS (BASEBALL/SOFTBALL COMPLEX) $113,700.00 118. Hot Mixed Asphalt, 3.5" depth S.Y. 2,976 $25.00 $74,400.00 119. Dense Graded Base, 12-inch depth S.Y. 3,274 $12.00 $39,283.20 $921,200.00 120. Remove Topsoil from Infield Area (8" depth) S.Y. 1,613 $1.50 $2,419.17 121. Synthetic Turf w/ Field Markings (infield) S.F. 14,515 $6.00 $87,090.00 122. Synthetic Turf - Finish Drainage Stone, 2" depth S.Y. 1,613 $6.00 $9,676.67 123. Synthetic Turf - Base Drainage Stone, 6" depth S.Y. 1,613 $12.00 $19,353.33 124. Geotextile Fabric S.Y. 1,613 $2.50 $4,031.94 125. 12" x 12" Concrete Curb and Nailer (with base course) L.F. 455 $35.00 $15,925.00 126. Flat Panel Underdrain 1"x12" L.F. 1,500 $12.00 $18,000.00 127. 12" HDPE Perforated Socked Storm Pipe w/clear Stone Trench and End Caps L.F. 600 $90.00 $54,000.00 128. 48" Concrete Manhole EACH 3 $4,500.00 $13,500.00 129. Turf Utility Boxes EACH 2 $2,000.00 $4,000.00 130. Softball Pitching Rubber & Home Plate W/ Concrete Foundations, Synthetic Turf SET 1 $4,500.00 $4,500.00 131. Softball Bases w/ Concrete Foundations, Synthetic Turf SET 1 $2,000.00 $2,000.00 132. Warning Track Material (6" depth) S.Y. 761 $25.00 $19,025.00 SOFTBALL FIELD 3 (200') (SYNTHETIC TURF INFIELD) BALLFIELD PLAZA BALLFIELD PLAZA CONCESSION/RESTROOM BUILDING SOFTBALL FIELD 2 (200') (SYNTHETIC TURF INFIELD) 133. Underdrain L.S. 1 $17,000.00 $17,000.00 134. Topsoil Amendment S.Y. 3,157 $10.00 $31,572.22 135. Athletic Field Seeding S.F. 28,415 $0.50 $14,207.50 136. Irrigation EACH 1 $10,000.00 $10,000.00 137. 24' Backstop, Black Vinyl Coated L.S. 1 $30,000.00 $30,000.00 138. Fence, Black Vinyl Coated Chain Link, 8-foot high L.F. 820 $65.00 $53,300.00 139. Fence Gate, Black Vinyl Coated Chain Link, 4' W 8' H EACH 5 $2,500.00 $12,500.00 140. Fence Gate, Black Vinyl Coated Chain Link, 12' W x 8' H EACH 2 $4,000.00 $8,000.00 141. Foul Poles SET 1 $12,000.00 $12,000.00 142. Gameshade Dugout w/ 8' Vinyl Fencing EACH 2 $20,000.00 $40,000.00 143. Concrete Dugout Pads and Base Course EACH 2 $10,000.00 $20,000.00 144. Scoreboard EACH 1 $20,000.00 $20,000.00 145. Electrical Allowance L.S. 1 $10,000.00 $10,000.00 146. Lighting Allowance L.S. 1 $260,000.00 $260,000.00 147. 3-Row Bleachers (32 seats) SET 3 $8,000.00 $24,000.00 148. Concrete, 5-inch depth (bleacher pad) S.F. 3,348 $7.00 $23,436.00 149. Dense Graded Base Course, 6-inch depth (bleacher pad) S.Y. 409 $7.00 $2,864.40 150. Retaining Wall Allowance F.F. 788 $100.00 $78,750.00 TEE BALL BACKSTOPS/FIELDS $40,000.00 151. Tee Ball Backstop EACH 4 $10,000.00 $40,000.00 ADDITIONAL BATTING CAGES $78,000.00 152. Batting Cages EACH 6 $13,000.00 $78,000.00 HARD SURFACE - WEST PARKING LOT EXPANSION (143 SPACES) $257,800.00 153. Hot Mixed Asphalt, 3.5" depth S.Y. 4,912 $25.00 $122,800.00 154. Dense Graded Base, 12-inch depth S.Y. 5,403 $12.00 $64,838.40 155. Concrete, 5-inch depth (associated walk) S.F. 4,598 $7.00 $32,186.00 156. Dense Graded Base, 6-inch depth S.Y. 562 $7.00 $3,933.84 157. Concrete Curb Ramp w/ Detectable Warning Field EACH 2 $1,800.00 $3,600.00 158. Striping L.S. 1 $1,500.00 $1,500.00 159. 24" Curb and Gutter L.F. 412 $30.00 $12,360.00 160. Parking Lot Lighting EACH 3 $5,500.00 $16,500.00 HARD SURFACE - NORTH PARKING AND DRIVE (4 SPACES) $53,600.00 161. Hot Mixed Asphalt, 3.5" depth S.Y. 860 $25.00 $21,500.00 162. Dense Graded Base, 12-inch depth S.Y. 946 $12.00 $11,352.00 163. Concrete, 5-inch depth (associated walk) S.F. 1,500 $7.00 $10,500.00 164. Dense Graded Base, 6-inch depth S.Y. 183 $7.00 $1,283.33 165. Concrete Curb Ramp w/ Detectable Warning Field EACH 3 $1,800.00 $5,400.00 166. Striping L.S. 1 $800.00 $800.00 167. 24" Curb and Gutter L.F. 92 $30.00 $2,760.00 HARD SURFACE - EAST PARKING (154 SPACES) $331,400.00 168. Hot Mixed Asphalt, 3.5" depth S.Y. 5,668 $25.00 $141,700.00 169. Dense Graded Base, 12-inch depth S.Y. 6,235 $12.00 $74,817.60 170. Concrete, 5-inch depth (associated walk) S.F. 6,895 $7.00 $48,265.00 171. Dense Graded Base, 6-inch depth S.Y. 843 $7.00 $5,899.06 172. Concrete Curb Ramp w/ Detectable Warning Field EACH 4 $1,800.00 $7,200.00 173. Striping L.S. 1 $2,500.00 $2,500.00 174. Drive Apron, 6-inch depth concrete S.F. 505 $8.00 $4,040.00 175. Concrete, 8-inch depth (drive apron) S.Y. 62 $10.00 $617.22 176. 24" Curb and Gutter L.F. 810 $30.00 $24,300.00 177. Parking Lot Lighting EACH 4 $5,500.00 $22,000.00 ACCESSIBLE PLAY AREA (NORTH) $233,500.00 178. Play Equipment Allowance L.S. 1 $120,000.00 $120,000.00 179. PIP Surface S.F. 4,500 $22.00 $99,000.00 180. Concrete Thickened Edge Walk, 5-inch depth S.F. 1,126 $12.00 $13,512.00 181. Dense Graded Base, 6-inch depth S.Y. 138 $7.00 $963.36 PLAY AREA (AQUATIC CENTER AREA) $108,700.00 182. Play Equipment Allowance L.S. 1 $75,000.00 $75,000.00 183. PIP Surface S.F. 1,270 $22.00 $27,940.00 184. Concrete Thickened Edge Walk, 5-inch depth S.F. 448 $12.00 $5,376.00 185. Dense Graded Base, 6-inch depth S.Y. 55 $7.00 $383.29 PLAY AREA (SOUTH) $161,300.00 186. Play Equipment Allowance L.S. 1 $140,000.00 $140,000.00 187. Playground Surfacing (wood fiber @ 14" depth) S.Y. 503 $25.00 $12,575.00 188. 5" depth Concrete S.F. 985 $8.00 $7,880.00 189. Dense Graded Base, 6-inch Depth S.Y. 120 $7.00 $842.72 COVERED HOCKEY RINK AREA $181,100.00 190. 5" depth Concrete S.F. 18,746 $8.00 $149,968.00 191. Dense Graded Base, 6-inch Depth S.Y. 2,291 $7.00 $16,038.24 192. Boards and Brackets Allowance L.S. 1 $15,000.00 $15,000.00 193. Shelter (200'x85') - Not included in Estimate S.F. 17,000 TBD TBD AQUATIC CENTER AMENITIES $107,100.00 194. Relocated Fencing L.F. 470 $65.00 $30,550.00 195. Remove Existing Volleyball Allowance L.S. 1 $1,500.00 $1,500.00 196. Aquatic Area Shade Shelters Allowance L.S. 1 $75,000.00 $75,000.00 SEATING AREAS (ALONG PERIMETER SIDEWALK) $8,800.00 197. Benches EACH 8 $800.00 $6,400.00 198. 5" depth Concrete S.F. 264 $8.00 $2,112.00 199. Dense Graded Base, 6-inch Depth S.Y. 32 $7.00 $225.87 $21,100.00 200. 8" Reinforced Concrete S.F. 350 $10.50 $3,675.00 201. Dense Graded Base, 6-inch depth S.Y. 47 $6.00 $280.00 202. 8' H Vinyl Coated Chain Link Fence (with privacy slatting) L.F. 55 $75.00 $4,125.00 203. Bollards EACH 4 $750.00 $3,000.00 204. 20' wide Gate EACH 1 $10,000.00 $10,000.00 BUILDINGS AND MISCELLANEOUS AMENITIES $3,909,250.00 205. Multipurpose Park Building S.F. 4,800 $450.00 $2,160,000.00 206. Storage Building S.F. 625 $200.00 $125,000.00 207. Park Restroom/Shelter Building (enclosed area) S.F. 1,635 $450.00 $735,750.00 208. Park Restroom/Shelter Building (open-sided area) S.F. 1,798 $250.00 $449,500.00 209. Existing Restrooms Reconstruction Allowance (2) S.F. 920 $450.00 $414,000.00 210. Skate Park Expansion Allowance (with additional fencing) L.S. 1 TBD TBD 211. Landscaping Allowance L.S. 1 $25,000.00 $25,000.00 SUMMARY CONSTRUCTION ITEMS TOTAL: $13,574,450.00 CONTINGENCY at 7%: $950,220.00 CONSTRUCTION ESTIMATE SUBTOTAL: $14,524,670.00 SURVEY & GEOTECHNICAL BORINGS $20,000.00 SUMMARY - PROJECT TOTAL $14,544,670.00 Notes: Topographic Survey not completed at time of study. Existing conditions may impact cost estimate. Geotechnical study not completed at time of study. Soil conditions may impact cost estimate. DUMPSTER AREA IMPROVEMENTS 1. ITEMS OF SPECIAL NOTE 2. WORK PLAN PROJECTS Strategic Plan Initiatives  Community Engagement o Continue to update residents via website and social media. 3. KENNEDY PARK RENOVATION 10/19/26 Renovation: Lights for Rajek Field are scheduled for delivery the week of October 19 with installation taking place immediately. Capital Campaign: Total funds at the Community Foundation are $103,439.55 as of July 20th. Grants: No new information to share. Construction: There are still a couple of items that need to be completed . There is fencing work and concrete repairs. The contractor has worked with the sub -contractors to get these items scheduled. The dugout doors wer e adjusted and an irrigation leak that was found in September has been repaired. 4. AQUATIC CENTER REPAIRS • A contract with Neuman Pools was approved at the July Board Meeting to complete leak testing on the play structure. They will complete leak detection following the plumbing project. • Neuman Pools have been on site since October 8th working on the pumps, valves, and plumbing project. VILLAGE OF WESTON, WISCONSIN SHAWN OSTERBRINK, PARK DIRECTOR MONTHLY DEPARTMENT REPORT TO THE BOARD OF TRUSTEES #2026-10 FOR SEPTEMBER 2026 5. PLAYGROUND UPDATE • 10/19/2026 The final walk through was completed on Thursday, August 20th. The two main items that were found were a cracked panel on the challenge course and three broken net fasteners at Sandhill. All items were covered under warranty, and final payment has been issued. 6. DISC GOLF COURSE UPDATE • 10/19/2026 No new work has been completed since the previous update. 7. MACHMUELLER PARK MASTER PLAN • The consultant has completed the revisions to the plan based on the comments and has also completed the cost estimate. The plan and estimate will be presented to the Park Committee at their October 26 meeting. 8. IDENTIFIED NEEDS 9. MISCELLANOUS COMMENTS / ISSUES • Park Work – Staff have been spraying, fertilizing, emptying garbage, cleaning and stocking restrooms, mowing, trimming, disassembling items at the aquatic center, equipment maintenance and various other projects. • Aquatic Center – Received our final invoice from the YMCA and payment has been made. We will continue to have utility bills through the end of the year. • Park rentals for the season end on October 15th. END OF PACKET

Source: Village of Weston website. First collected Oct 26, 2026.