RecordWell Data

_06022026-1046

Village of Saukville · Ozaukee County · meeting of Jun 2, 2026 · Minutes

Open the original document More from Village of Saukville

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Public Works Committee June 2, 2026 Public works Chairperson Pamela Duckart called the meeting to order at 4:00 p.m. Village Administrator Dawn Wagner gave the Statement of Public Notice Public Works Members: Pamela Duckart-present, Wendy Smith-present, Bill Rudolph-present, and Dan Helm-Present. Others Present: Dawn Wagner. 2026 Street Projects • Crack Filling will be completed on Mayfair Rd, Dekora Woods Blvd, N Market, 100-300 Block of Colonial Parkway and Center St. • Paving on the 3 crosswalks on Church St. replacing paver with Asphalt. • Chip Seal will be completed on Cedar Sauk Road in June 2026. Summer Projects • Installed New Swing Set at Quade Park. • Replaced damaged equipment at the Quade Park Playground and wood chips were added woodchips to the Playground area. • Replace all the lights in the pavilion with updated LED Lights/power washed the concrete and restrained multiple board on the Pavilion at Quade Park. • New Baseball Fence was installed at Peninsula Park, baseball bases were also updated and 4 dump truck loads of ball diamond mix were added to the infield. • 80 Feet of the Fence at Schowalter Field was repaired. Equipment Update • New Loader arrived with snowplow in mid-December of 2025. • New Pick-up Truck with snowplow was ordered in February and is expected to be here in June 2026. Cemetery Report • Year to date there has been 6 Burials. 4 Cremations and 2 Full Burials. • 3 Niches were sold in June 2026. • A column on the South end of the Cemetery was damaged when a tree fell during the winter snow/wind storm taking 3 feet off the top of the Column. Holton Brothers will be rebuilding the column in June 2026. Other Matters • The 2 Seasonal Summer help employee have returned. Brady Fleishmann is coming back for his 5th year and Max Reyes is back for his 4th year. • Spring Clean Up Dempster were a success Adjournment Duckart/Smith made a motion to adjourn. Motion Carried at 4:52 p.m. Respectfully submitted, Dan Helm Public Works Superintendent

Source: Village of Saukville website. First collected Oct 8, 2026.