RecordWell Data

_05202025-954

Village of Saukville · Ozaukee County · meeting of May 20, 2025 · Minutes

Open the original document More from Village of Saukville

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

H:\Minutes\Utility Minutes\Utility 2025\Utility Minutes 05-20-25.doc ** UTILITY COMMITTEE MEETING ** May 20, 2025 SAUKVILLE WASTEWATER TREATMENT PLANT 1600 E COTTONTAIL LANE SAUKVILLE, WISCONSIN 53080 The meeting was called to order at 4:30 p.m. by Jesse Duckart Statement of Public Notice was given by Dawn Wagner, Village Administrator. Members Present: Jesse Duckart, Bill Rudolph and Wendy Smith Also Present: Dawn Wagner, Ray Hartmann, and Dale Kropidlowski SEWER UPDATE Hartmann talked about the Facilities plan for Biosolids • The Facilities Plan covering Dewatering and Dryers should be completed by late fall. • The New WWTP Discharge Permit will take effect in September. o Future PFAS Testing is required with the New Permit. • The Knollwood Street and Whitegate St reet Project will start the week of May 27, 2025. Sewer lat erals will be slipped lined in the project. 2024 Compliance Maintenance Annual Report (CMAR) Hartmann reviewed the CMAR. The CMAR gave the WWTP/Utility an A – 4.0 rating. No action is needed at this time. Smith/Rudolph made a recommendation to the Village Board the approval of the 202 4 Compliance Maintenance Annual Report (CMAR). Motion Carried. WATER SYSTEMS UPDATES Kropidlowski stated the Water Department continues to sample the water distribution system for PFAS per the DNR requirements. All the r esults are posted on the Village website. The Water Depar tment is looking into future options for treatment. Kropidlowski added Well #1 (Grady Park) was repaired. A new pump and column pi pe was installed. Estimated cost is $55,000. Last rehabbed in 2018. In Fall, the Water De partment will have divers dive the standpipe and water tower to check for any deficiencies and vacuum out sediment that has settled in the tanks. The Water Department is in the process of changing out Water Meters. WATER MAIN LOOP PROJECT Kropidlowski stated the Village met with Eric Von Schledorn regarding the Village obtaining an easement through his property. Kropidlow ski added Eric Von Schledorn is very receptive to the idea. Ruekert and Mielke is currently working on the design. This project will be funded with the 2027 Borrowing. OTHER MATTERS None. ADJOURNMENT Duckart/Smith made a motion to adjourn. Motion carried at 5:05 p.m. Ray Hartmann Wastewater Superintendent

Source: Village of Saukville website. First collected Oct 8, 2026.