Board of Public Works — Agenda Packet
Village of Jackson · Washington County · Board of Public Works · meeting of Oct 27, 2026 · Agenda packets
Open the original document More from Village of Jackson
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
October 27, 2026 Village of Jackson - Board of Public Works Meeting Agenda
VILLAGE OF JACKSON
BOARD OF PUBLIC WORKS MEETING AGENDA
Tuesday, October 27, 2026 at 6:00 PM
Jackson Municipal Complex
Village Board Room
N168W19851 Main Street
Jackson, WI 53037
1. Call to Order and Roll Call
2. Citizens/Village Staff to address the Board of Public Works (Please sign in with the Clerk
prior to speaking. Please note this is a business meeting, not a public hearing. People
wishing to speak on an item on the agenda should present their comments under this agenda
item. Each commenter will be limited to a total of 2 minutes.)
3. Approval of Minutes of the Board of Public Works Meeting of July 28, 2026
4. Pay Request #5 – 2026 Street Improvement Projects - Eagle Drive, Hawthorn Drive, Aspen
Drive, and Linden Drive - Vinton Construction in the amount of $451,515.66
5. Reimbursement Request #17 - Final - 2024 Wastewater Treatment Plant Tertiary Filters and
UV Disinfection Project - Clean Water Fund Loan in the amount of $6,424.24
6. Resolution #26-33 - Authorization to Increase Sewer Utility Rates Effective January 1, 2027
7. Resolution #26-34 - Final Resolution Authorizing the Levy of Special Assessments Against
Benefited Property Associated With the 2026 Eagle, Hawthorn, Aspen, and Linden Drive
Reconstruction Project
8. Director of Public Works Report
9. Adjourn
Persons with disabilities requiring special accommodations for attendance at the meeting should contact the
Administration Department at the Jackson Municipal Complex at least one (1) business day prior to the
meeting.
It is possible that members of the Village Board may attend the above meeting. No action will be taken by any
governmental body at this meeting other than the governmental body specifically referred to in this meeting
notice. This notice is given so that members of the Village Board may attend the meeting without violating the
open meeting law.
Page 1 of 28
July 28, 2026 Village of Jackson - Board of Public Works Meeting Minutes
Page 1 of 3
VILLAGE OF JACKSON
BOARD OF PUBLIC WORKS MEETING
Tuesday, July 28, 2026 at 6:00 PM
Minutes
1. Call to Order and Roll Call
The meeting was called to order at 6:06 PM by President Heckendorf.
Members Present: President Brian Heckendorf, Trustee Tim Engelhardt, Trustee John
Schlenz, Stephanie Egner, Jeff Mitchell, and Josh Sandleback
Members Excused: Ryan Ganshow
Members Absent: None
Staff Present: Administrator Jen Heidtke, Public Works Director Jack Straehler, and Clerk
Lisa Heiser
2. Citizens/Village Staff to address the Board of Public Works (Please sign-in with the Clerk
prior to speaking. Please note this is a business meeting, not a public hearing. People wishing
to speak on an item on the agenda should present their comments under this agenda item.
Each commenter will be limited to a total of 2 minutes.)
None.
3. Approval of Minutes of the Board of Public Works Meeting of June 30, 2026
The motion to approve minutes for the Board of Public Works Meeting of June 30, 2026,
was made by Tr. Schlenz and seconded by Tr. Engelhardt.
Vote: 6 ayes, 0 nays. Motion carried.
4. Presentation by MSA Engineering - Review 2025 Dog Park at Cedar Creek Park
MSA Engineering provided an update on construction progress, the anticipated completion
timeline, and the financial impact to the Village for the Cedar Creek Dog Park and answered
questions from the committee.
5. Presentation and Discussion - 2026 Budget Review and Proposed 2027 Budget - Public
Works, Water, and Wastewater Utilities
Director Straehler provided an update on the status of the 2026 budget, including projected
year-end outcomes and anticipated overages, as well as key revisions in the 2027 draft
budget which will be presented to the Village Board in August.
The motion to recommend the Village Board approve the proposed draft 2027 budgets for
Engineering, Streets, Park, Trash, Water, and Wastewater was made by J. Sandleback and
seconded by J. Mitchell.
Vote: 6 ayes, 0 nays. Motion carried.
DRAFT
Page 2 of 28
July 28, 2026 Village of Jackson - Board of Public Works Meeting Minutes
Page 2 of 3
6. Pay Request #2 – 2026 Street Improvement Projects - Eagle Drive, Hawthorn Drive, Aspen
Drive, and Linden Drive - Vinton Construction in the amount of $239,438.64
The motion to recommend that the Budget and Finance Committee and Village Board
approve Pay Request #2 for Vinton Construction in the amount of $239,438.64 was made by
Tr. Engelhardt and seconded by Tr. Schlenz.
S. Egner left the boardroom at 6:44 PM.
Vote: 5 ayes, 0 nays. Motion carried. S. Egner was absent during consideration and vote.
7. Pay Request #2 - Final - 2026 Wastewater Treatment Plant Fill Removal Project – BMCI
Construction in the amount of $6,252.75
The motion to recommend that the Budget and Finance Committee and Village Board
approve Pay Request #2 (Final) for BMCI Construction in the amount of $6,252.75 was
made by Tr. Engelhardt and seconded by J. Mitchell.
Vote: 5 ayes, 0 nays. Motion carried. S. Egner was absent during consideration and vote.
8. Review of Bids - 2026 Streetlight Improvement Project - Ridgeway Drive, Chestnut Court,
and Hickory Lane
The motion to recommend that the Budget and Finance Committee and Village Board award
the contract for the 2026 Streetlight Improvement Projects, including Ridgeway Drive,
Chestnut Court, and Hickory Lane, to MP Systems in the amount of $229,596.09 was made
by Tr. Schlenz and seconded by Tr. Engelhardt.
Vote: 5 ayes, 0 nays. Motion carried. S. Egner was absent during consideration and vote.
9. Review Design and Engineering Services Proposals - 2027 Street Improvement Projects -
Jackson Drive and Georgetown Drive
The motion to recommend that the Budget and Finance and Village Board award the design
and engineering contract for the 2027 Street Improvement Projects, including Jackson Drive
and Georgetown Drive, to Cedar Corporation in the amount of $38,300 was made by Tr.
Schlenz and seconded by Tr. Engelhardt.
S. Egner returned to the Boardroom at 6:48 PM.
Vote: 6 ayes, 0 nays. Motion carried.
10. WE Energies Easement Agreement for the Relocation of Utilities on Eagle Drive
The motion to recommend that the Village Board approve the easement request for
W194N16660 Eagle Drive (Tax Key V3-019700E) and the adjacent lot Tax Key V3-
019800A was made by Tr. Engelhardt and seconded by J. Mitchell.
Vote: 6 ayes, 0 nays. Motion carried.
DRAFT
Page 3 of 28
July 28, 2026 Village of Jackson - Board of Public Works Meeting Minutes
Page 3 of 3
11. Director of Public Works Report
Director Straehler provided a brief summary of the items outlined in the report and answered
questions from the committee.
The motion to place the July 2026 Director's Report on file was made by Pr. Heckendorf and
seconded by Tr. Engelhardt.
Vote: 6 ayes, 0 nays. Motion carried.
12. Adjourn
The motion to adjourn the meeting was made by J. Mitchell and seconded by J. Sandleback.
Vote: 6 ayes, 0 nays. Motion carried. The meeting adjourned at 7:04 PM.
Respectfully Submitted,
Lisa Heiser
Village Clerk
Village of Jackson
DRAFT
Page 4 of 28
Taking the lead in Washington County
STAFF MEMO Village of Jackson Public Works
To: Brian Heckendorf, Village President
Jen Heidtke, Village Administrator
CC: Budget and Finance; Village Board
From: Jack Straehler, Director of Public Works
Subject: Pay Request #5 - 2026 Street Improvement Projects - Eagle Drive, Hawthorn
Drive, Aspen Drive, and Linden Drive - Vinton Construction in the amount of $451,515.66
Meeting Date: October 27, 2026 - Board of Public Works
Background and Analysis:
This memo is to inform the Board of Pay Request # 5 from Vinton Construction in the
amount of $451,515.66 for work completed on the 2026 Street Improvement Projects,
which include Eagle Drive, Hawthorn Drive, Aspen Drive, and Linden Drive.
The work has been reviewed and verified for accuracy and completion in accordance with
the project contract documents and has been found to be acceptable.
Funding for this payment will come from the following accounts:
600-00-56700-400-000 (Capital Projects Repairs/Construction - 54%) $243,818.46
300-00-17600-000-380 (Sewer Construction Work - 39%) $176,091.11
200-00-18600-395-000 (Water Construction Work - 7%) $31,606.09
If you have any questions, please let me know.
JS
Recommendation:
Board of Public Works recommends the Budget and Finance Committee and Village Board
approve Pay Request #5 for Vinton Construction in the amount of $ 451,515.66.
Page 5 of 28
Cedarburg • Green Bay • Madison • Menomonie
Community Infrastructure • Architecture • Environmental Services
W61N497 Washington Avenue
Cedarburg, WI 53012
262-204-2360
www.cedarcorp.com
October 15, 2026
Village of Jackson
N168 W20733 Main Street
PO Box 637
Jackson, WI 53037
Attn: Mr. Jack Straehler II, Director of Public Works
Subject: Contractor’s Application for Payment No. 5
Eagle Drive, Hawthorn Drive, Aspen Drive & Linden Drive Reconstruction 2026
Cedar Project No. 05789-0029
Dear Mr. Straehler:
Enclosed for your use in payment to Vinton Construction Company in the amount of $451,515.66 is Contractor’s
Application for Payment No. 5.
Following your review and approval, please complete the application for payment forms within the areas reserved
for the Owner. Thereafter, retain one copy for your records, provide the second copy to the Contractor with
payment and provide the third copy to our office.
Should you have any questions, please feel free to contact me at our Cedarburg office.
Sincerely,
CEDAR CORPORATION
Douglas T. Kroes
Senior Construction Manager
Enclosed: Contractor’s Application for Payment No. 5
Cc: Grant Manion, Vinton Construction Company
Page 6 of 28
10/12/26
10/15/26
Page 7 of 28
Unit Price Progress Estimate
B C D E F G H I J
Quantity Amount Quantity Amount Quantity Amount Quantity Amount
100-01 1 LS $5,750.00 1 $5,750.00 1 $5,750.00 100.0%
100-02 3790 LF $4.60 3790 $17,434.00 3790 $17,434.00 100.0%
100-03 3805 SY $7.16 3805 $27,243.80 3805 $27,243.80 100.0%
100-04 7685 CY $26.97 7685 $207,264.45 7685 $207,264.45 100.0%
100-05 755 CY $24.00 755 $18,120.00 1965.07 $47,161.68 2720.07 $65,281.68 360.3%
100-06 1685 SY $7.12 842 $5,995.04 843 $6,002.16 1685 $11,997.20 100.0%
100-07 795 TON $16.50 664.53 $10,964.75 254.66 $4,201.89 919.19 $15,166.64 115.6%
100-08 7800 TON $16.50 7800 $128,700.00 1341.82 $22,140.03 9141.82 $150,840.03 117.2%
100-09 1660 TON $21.37 2381.3 $50,888.38 2,381.30 $50,888.38 143.5%
100-10 1755 TON $69.00 1203.05 $83,010.45 692.32 $47,770.08 1895.37 $130,780.53 108.0%
100-11 1170 TON $65.90 799.9 $52,713.41 370.1 $24,389.59 1170 $77,103.00 100.0%
100-12 545 TON $98.20 545 $53,519.00 545
100-13 10 SY $59.00 10 $590.00 10 $590.00 100.0%
100-14 40 LF $50.00 40 $2,000.00 40 $2,000.00 100.0%
100-15 5405 LF $18.55 5404 $100,244.20 319.3 $5,923.02 5723.3 $106,167.22 105.9%
100-16 60 LF $45.00 60 $2,700.00 60 $2,700.00 100.0%
100-17 23645 SF $6.80 14073 $95,696.40 9009.5 $61,264.60 23082.5 $156,961.00 97.6%
100-18 140 SF $8.20 140 $1,148.00 140 $1,148.00 100.0%
100-19 50 SF $35.00 50 $1,750.00 50 $1,750.00 100.0%
100-20 2605 SY $75.75 2565.55 $194,340.41 2565.55 $194,340.41 98.5%
100-21 8 CY $1,200.00 8 $9,600.00 8 $9,600.00 100.0%
100-22 1 EA $200,000.00 0.85 $170,000.00 0.15 $30,000.00 1 $200,000.00 100.0%
100-23 885 LF $2.11 885 $1,867.35 885 $1,867.35 100.0%
100-24 40 LF $9.06 40 $362.40 40 $362.40 100.0%
100-25 30 EA $34.07 30 $1,022.10 30 $1,022.10 100.0%
100-26 6 EA $104.50 6 $627.00 6 $627.00 100.0%
100-27 10 EA $71.50 10 $715.00 10 $715.00 100.0%
100-28 27 EA $71.50 27 $1,930.50 27 $1,930.50 100.0%
100-29 11400 SY $7.01 5310 $37,223.10 3690 $25,866.90 9000 $63,090.00 78.9%
100-30 2700 SY $8.23
100-31 4 CY $500.00 9 $4,500.00 9 $4,500.00 225.0%
100-32 2380 SY $2.00 7998 $15,996.00 7998 $15,996.00 336.1%
100-33 1 LS $28,000.00 0.85 $23,800.00 0.15 $4,200.00 1 $28,000.00 100.0%
100-34 1 LS $3,500.00 1 $3,500.00 1 $3,500.00 100.0%
100-35 2 EA $7,000.00
100-36 4492 LF $2.40 4492 $10,780.80 4492 $10,780.80 100.0%
100-37 17 LF $16.00 17 $272.00 17 $272.00 100.0%
100-38 12 LF $8.00 12 $96.00 12 $96.00 100.0%
100-39 145 LF $10.75 145 $1,558.75 145 $1,558.75 100.0%
100-40 675 LF $2.50 675 $1,687.50 675 $1,687.50 100.0%
Curb Ramp Detectable Warning Field Natural Patina
Concrete Driveway 7-Inch
Concrete Surface Drains
Mobilization
Silt Fence
Topsoil, Seed, Fertilizer, and Erosion Mat
Temporary Ditch Checks
Culvert Pipe Checks
Inlet Protection Type A
Inlet Protection Type B
Inlet Protection Type C
Sawing Asphalt
HMA Pavement 3 LT 58-28 S
HMA Pavement 4 LT 58-28 S
Asphaltic Surface Driveways
Asphaltic Flumes
Concrete Curb & Gutter 18-Inch Type D
Concrete Curb Pedestrian
Concrete Sidewalk 4-Inch
Concrete Sidewalk 6-Inch
Clearing & Grubbing
Removing Curb & Gutter
Removing Concrete Driveways and Sidewalk
Excavation Common
Excavation Below Subgrade
Pulverize and Relay
Base Aggregate Dense 3/4-Inch
Base Aggregate Dense 1 1/4-Inch
Base Aggregate Dense 3-Inch
Concrete Curb & Gutter 30-Inch Type D
%
Comp.Bid No.
Description
Previous Applications This Application Materials Stored
Total Completed & Stored to Date
(C+E+G)
Contractor's Application
5
9/1/26 - 9/30/26 October 13, 2026
Eagle Drive, Hawthorn Drive, Aspen Drive, Linden Drive
A
Item Estimated
Bid
Quantity
Unit
Price
Quantity Completed
Project:
Application Period:
Application Number:
Application Date:
Topsoil, Seed, Fertilizer, and Mulch
Riprap Medium w/ Geotextile Fabric Type HR
Geotextile Fabric Type SAS
Traffic Control
Permanent Signing
Rectangular Rapid Flashing Beacon (STA 67+18)
Marking Line Epoxy 4-Inch
Marking Stop Line Epoxy 18-Inch
Marking Diagonal Epoxy 12-Inch
Marking Crosswalk Epoxy Transverse Line 6-Inch
00 62 76 - 2
10/12/26
Page 8 of 28
Unit Price Progress Estimate
B C D E F G H I J
Quantity Amount Quantity Amount Quantity Amount Quantity Amount
%
Comp.Bid No.
Description
Previous Applications This Application Materials Stored
Total Completed & Stored to Date
(C+E+G)
Contractor's Application
5
9/1/26 - 9/30/26 October 13, 2026
Eagle Drive, Hawthorn Drive, Aspen Drive, Linden Drive
A
Item Estimated
Bid
Quantity
Unit
Price
Quantity Completed
Project:
Application Period:
Application Number:
Application Date:
100-41 1085 LF $3.00 1085 $3,255.00 1085 $3,255.00 100.0%
200-01 12 EA $400.00 4 $1,600.00 6 $2,400.00 10 $4,000.00 83.3%
200-02 3 EA $400.00 3 $1,200.00 3 $1,200.00 100.0%
200-03 254 LF $30.00 237 $7,110.00 3 $90.00 240 $7,200.00 94.5%
200-04 1 CY $400.00 1 $400.00 1 $400.00 100.0%
200-05 1 EA $300.00 1 $300.00 1 $300.00 100.0%
200-06 8 EA $400.00 8 $3,200.00 8 $3,200.00 100.0%
200-07 6 EA $520.00 5 $2,600.00 5 $2,600.00 83.3%
200-08 1 EA $1,840.00 1 $1,840.00 1 $1,840.00 100.0%
200-09 196 LF $56.07 198 $11,101.86 198 $11,101.86 101.0%
200-10 907 LF $64.52 893 $57,616.36 5 $322.60 898 $57,938.96 99.0%
200-11 681 LF $66.68 601 $40,074.68 82 $5,467.76 683 $45,542.44 100.3%
200-12 291 LF $121.54 290.5 $35,307.37 2.5 $303.85 293 $35,611.22 100.7%
200-13 98 LF $142.59 98 $13,973.82 98 $13,973.82 100.0%
200-14 70 LF $51.81 69 $3,574.89 69 $3,574.89 98.6%
200-15 1063 LF $52.10 1063 $55,382.30 1063 $55,382.30 100.0%
200-16 29 LF $57.68 29 $1,672.72 29 $1,672.72 100.0%
200-17 2807 LF $24.70 2917.1 $72,052.37 2917.1 $72,052.37 103.9%
200-18 151 LF $50.00 120 $6,000.00 120 $6,000.00 79.5%
200-19 15 EA $3,784.00 15 $56,760.00 15 $56,760.00 100.0%
200-20 7 EA $4,200.00 7 $29,400.00 7 $29,400.00 100.0%
200-21 3 EA $5,000.00 3 $15,000.00 3 $15,000.00 100.0%
200-22 7 EA $3,075.95 7 $21,531.65 7 $21,531.65 100.0%
200-23 2 EA $950.00 2 $1,900.00 2 $1,900.00 100.0%
200-24 33 EA $100.00 36 $3,600.00 36 $3,600.00 109.1%
200-25 1 EA $150.00 1 $150.00 1 $150.00 100.0%
200-26 3 EA $250.00 2 $500.00 1 $250.00 3 $750.00 100.0%
300-01 4 EA $2,000.00 4 $8,000.00 4 $8,000.00 100.0%
300-02 3 EA $500.00 3 $1,500.00 1 $500.00 4 $2,000.00 133.3%
300-03 40 LF $75.00 18 $1,350.00 18 $1,350.00 45.0%
300-04 4 EA $815.00 4 $3,260.00 4 $3,260.00 100.0%
300-05 44 EA $528.00 44 $23,232.00 44 $23,232.00 100.0%
300-06 44 LF $115.76 29 $3,357.04 11.5 $1,331.24 40.5 $4,688.28 92.0%
300-07 2 EA $3,000.00 4 $12,000.00 4 $12,000.00 200.0%
300-08 1 EA $3,734.00 1 $3,734.00 1 $3,734.00 100.0%
300-09 4 EA $7,500.00 4 $30,000.00 4 $30,000.00 100.0%
300-10 1 EA $2,000.00 2 $4,000.00 2 $4,000.00 200.0%
300-11 21 EA $200.00 4 $800.00 17 $3,400.00 21 $4,200.00 100.0%
300-12 192 SF $5.00
400-01 12 EA $1,000.00 12 $12,000.00 12 $12,000.00 100.0%
Hydrant Extension
Adjusting Water Valves
Polystyrene Insulation
Sanitary Sewer Manhole Covers Type J-Special
Manholes 5-FT Diameter w/ Casting
Inlets Median 1 Grate w/ Casting
Adjusting Inlet Covers
Connect to Existing Sump Pump Discharge
Catch Basins 2.5x3-FT w/ Casting
Storm Sewer Pipe PVC 4-Inch - Trenched
Storm Sewer Pipe HDPE 4-Inch - Directionally Drilled
Manholes 4-FT Diameter w/ Casting
Storm Sewer Pipe Class III-A 12-Inch
Storm Sewer Pipe Class III-A 15-Inch
Storm Sewer Pipe HDPE 12-Inch
Pipe Arch Corrugated Steel 24X18-Inch
Storm Sewer Pipe Reinforced Concrete Class IV 12-Inch
Storm Sewer Pipe Reinforced Concrete Class IV 15-Inch
Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class HE-IV 14x23-Inch
Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class HE-IV 19x30-Inch
Abandoning Storm Sewer
Apron Endwalls For Pipe Steel 12-Inch
Connect to Existing Storm Sewer Lateral
Apron Endwalls For Pipe Arch Steel 24X18-Inch
Apron Endwalls For Culvert Pipe Reinforced Concrete 12-Inch
Apron Endwalls For Culvert Pipe Reinforced Concrete Horizontal Elliptical 19x30-Inch
Remove and Replace Water Service Curb Box
Water Main PVC 6-Inch
Water Gate Valve 6-Inch
Water Gate Valve 8-Inch
Hydrant
Connect to Existing Storm Sewer Pipe
Remove Hydrant
Remove Gate Valve
Remove Water Main
Sawing Concrete
Removing Small Pipe Culverts
Removing Storm Sewer Structures
Removing Storm Sewer
Connect to Existing Water Main Fitting
00 62 76 - 3
10/12/26
Page 9 of 28
Unit Price Progress Estimate
B C D E F G H I J
Quantity Amount Quantity Amount Quantity Amount Quantity Amount
%
Comp.Bid No.
Description
Previous Applications This Application Materials Stored
Total Completed & Stored to Date
(C+E+G)
Contractor's Application
5
9/1/26 - 9/30/26 October 13, 2026
Eagle Drive, Hawthorn Drive, Aspen Drive, Linden Drive
A
Item Estimated
Bid
Quantity
Unit
Price
Quantity Completed
Project:
Application Period:
Application Number:
Application Date:
400-02 12 VF $436.00 12 $5,232.00 12 $5,232.00 100.0%
500-01 4218 LF $9.00 2800 $25,200.00 1400 $12,600.00 4200 $37,800.00 99.6%
500-02 1012 LF $15.00
500-03 4044 LF $1.10
500-04 3753 LF $2.00
500-05 15429 LF $2.75
500-06 23 EA $3,000.00
500-07 2 EA $3,000.00
500-08 1 EA $3,300.00
500-09 1 EA $2,500.00 1 $2,500.00 1 $2,500.00 100.0%
500-10 23 EA $900.00 9 $8,100.00 14 $12,600.00 23 $20,700.00 100.0%
500-11 3 EA $1,200.00 3 $3,600.00 3 $3,600.00 100.0%
A1-01 2665 TON $16.50
A1-02 705 TON $66.80
A1-03 470 TON $71.00
A1-04 2080 LF $18.15
A2-01 1775 TON $16.50 1775 $29,287.50 1304.43 $21,523.10 3079.43 $50,810.60 173.5%
A2-02 4010 SY $75.75 4010 $303,757.50 4010 $303,757.50 100.0%
A2-03 2080 LF $18.65 2080 $38,792.00 2.5 $46.63 2082.5 $38,838.63 100.1%
$2,200,655.30 $451,515.67 $2,652,170.96
Base Aggregate Dense 1 1/4-Inch
Concrete Pavement 8-Inch
Concrete Curb & Gutter 30-Inch Type A
HMA Pavement 4 LT 58-28 H
Concrete Curb & Gutter 30-Inch Type D
Furnish and Install Lighting Unit Type A
Furnish and Install Lighting Unit Type B - Single
Furnish and Install Lighting Unit Type B - Twin
Electrical Service Meter Breaker Pedestal Special
Quazite Pull Boxes 12X12X24-Inch
Electrical Wire Lighting 4 AWG
Reconstructing Sanitary Sewer Manhole
Concrete Base Type 5 Tall
Base Aggregate Dense 1 1/4-Inch
HMA Pavement 3 LT 58-28 S
TOTAL
Conduit Rigid Nonmetallic 2-Inch
Conduit Special 2-Inch
Electrical Wire Lighting 12 AWG
Electrical Wire Lighting 6 AWG
00 62 76 - 4
10/12/26
Page 10 of 28
Taking the lead in Washington County
STAFF MEMO Village of Jackson Public Works
To: Brian Heckendorf, Village President
Jen Heidtke, Village Administrator
CC: Board of Public Works; Budget and Finance; Village Board
From: Jack Straehler, Director of Public Works
Subject: Reimbursement Request #17 - Final - 2024 Wastewater Treatment Plant Tertiary
Filters and UV Disinfection Project - Clean Water Fund Loan in the amount of $6,424.24
Meeting Date: October 27, 2026 - Board of Public Works
Background and Analysis:
This memo is to inform the Board that, at its December 9, 2025, meeting, the Village Board
approved and accepted the completed 2024 Wastewater Treatment Plant Tertiary Filter
and UV Disinfection Project and authorized the Village Administrator to execute t he
documents necessary to close out the Clean Water Fund loan.
The attached Reimbursement Request number #17 - Final, in the amount of $6,424.24, is
associated with the 2024 Tertiary Filter and UV Disinfection Project. This request covers
the remaining engineering costs and construction management services related to final
system optimization and project closeout.
The work has been reviewed and verified for accuracy and completion in accordance with
the project contract documents and schedule.
Funding from this payment will reimburse Account Number:
300-00-17600-000-380 (Sewer Construction Work)
If you have any questions, please let me know.
JS
Recommendation:
Board of Public Works recommends the Budget and Finance Committee and Village Board
approve the Clean Water Fund Loan Reimbursement Request #1 7 – Final in the amount of
$6,424.24.
Page 11 of 28
Page 12 of 28
Page 13 of 28
Page 14 of 28
Page 15 of 28
Taking the lead in Washington County
STAFF MEMO Village of Jackson Public Works
To: Brian Heckendorf, Village President
Jen Heidtke, Village Administrator
CC: Board of Public Works; Budget and Finance; Village Board
From: Jack Straehler, Director of Public Works
Subject: Authorization to Increase Sewer Utility Rates Effective January 1, 202 7
Meeting Date: October 27, 2026 – Board of Public Works
Background and Analysis:
This memo is to inform the Board of a proposed 18% Sewer Utility Rate increase, to take
effect on January 1, 2027.
During the Ehlers Financial Advisor’s presentation at the Village Board Meeting on October
13, 2026, the financial need for this rate adjustment was reviewed. The increase is
necessary to prepare for the additional expenses anticipated with the forthcoming
Wastewater Treatment Plant projects and upgrades.
The need for a significant rate increase was first discussed during the 2024 budget
workshops. At that time, the Board determined it would be more manageable to implement
the required adjustments in smaller increments over multiple budget cycles rather than all
at once. This proposed 18% increase represents the third consecutive year of
implementing this planned adjustment.
If you have any questions, please let me know.
JS
Recommendation:
Board of Public Works recommends the Budget and Finance Committee and Village Board
approve a resolution authorizing an 18% increase in Sewer Utility Rates effective January
1, 2027.
Page 16 of 28
Resolution #26-33
1
RESOLUTION #26-33
AUTHORIZATION TO INCREASE SEWER UTILITY RATES
The Village Board of the Village of Jackson, Washington County, Wisconsin, does resolve
as follows:
WHEREAS, the Village of Jackson is responsible to set fees for special services,
penalties, and user fees established through policies and the Village Code; and,
NOW, THEREFORE, BE IT RESOLVED that the Village Board of the Village of
Jackson, Washington County, Wisconsin, does hereby establish Jackson Sewer Utility
Rates for the Wastewater Treatment Facility with an 18% increase. The new rates are
effective January 1, 2027, incorporated in the 2027 budget as follows:
Sewer Rates & Charges:
5/8" Meter $84.71 3" Meter $423.60
3/4" Meter $84.71 4" Meter $488.76
1" Meter $117.25 6" Meter $710.68
1 1/4" Meter $162.63 8" Meter $988.55
1 1/2" Meter $202.01 10" Meter $1,367.14
2" Meter $260.66
Plus Volume Charge:
$8.94 per 1,000 gal. Plus minimum charge.
Unmetered Residential Sanitary Sewer / Debt Service $78.45
Unmetered Residential Sanitary Sewer / Volume Charge $169.72
Introduced by: Seconded by:
Vote: Ayes Nays Passed and Approved:
Brian J. Heckendorf – Village President
Attest:
Lisa Heiser - Village Clerk
Page 17 of 28
Resolution #26-33
2
Proof of Posting:
I the undersigned, certify that I posted this Resolution on posting boards at the Jackson
Municipal
Complex, Post Office, and one other location in the Village.
Village Official Date
Page 18 of 28
1
Resolution #26-34
RESOLUTION #26-34
FINAL RESOLUTION AUTHORIZING THE LEVY OF SPECIAL
ASSESSMENTS AGAINST BENEFITED PROPERTY ASSOCIATED WITH
THE 2026 EAGLE, HAWTHORN, ASPEN, AND LINDEN DRIVE
RECONSTRUCTION PROJECT
WHEREAS, the Village Board of the Village of Jackson, Washington County,
Wisconsin, on the 21st day of April 2026, adopted a Preliminary Resolution declaring its
intention to levy special assessments pursuant to Section 66.0703, Wisconsin Statutes upon
the property benefited by the construction and reconstruction of public improvements
consisting of water and sanitary sewer mains; storm sewers; pavement; curb and gutter;
sidewalks; and street lighting.
WHEREAS, the governing body held a public hearing at the Jackson Municipal
Complex, located at N168W19851 Main Street at 7:30 p.m. on the 10th day of November 2026
for the purpose of hearing all interested persons who desired to speak concerning the project’s
improvements and assessments, and
WHEREAS, the governing body has examined Exhibit A and Exhibit B the report
relating to the improvements and assessments (contained therein) and has considered the
statements of those persons appearing at the public hearing,
NOW, THEREFORE, BE IT RESOLVED, by the Village Board of the Village of
Jackson, Washington County, Wisconsin, as follows:
The report pertaining to the construction of the above-described public improvements,
including plans and specifications, therefore, is adopted and approved.
1. The improvements were carried out in accordance with such report, and payment for
assessing the cost to the property shall make the improvements, benefited those
properties as indicated in the report.
2. The assessments shown on the report represent an exercise of police power, have
been determined and completed on a reasonable basis, and are hereby confirmed.
The total amount assessed is $123,638.83. The amount assessed against each of the
affected properties is enumerated in the Assessment Report contained herein.
3. The assessments for all projects included in the report are hereby combined as a
single assessment, but any interested property owner may object to each assessment
separately or to all of the assessments jointly, for any purpose.
4. The property owners may, at their option, pay the assessment to the Treasurer of
the Village of Jackson, in one single total payment, or have the amount added as a
Special Assessment at 5% annual interest to their annual property tax statement(s)
for a one-, three- or five-year term for amounts less than $5,000.00 and up to a ten-
Page 19 of 28
2
Resolution #26-34
year term for amounts in excess of $5,000.00 starting on tax statement year 2026.
5. The Village Clerk shall publish this Resolution as a Class 1 notice, an Installment
Assessment Notice, in accordance with Section 66.0703, Wisconsin Statutes.
6. The Village Treasurer shall mail to every interested person whose post office address
is known or can with reasonable diligence be ascertained, including each property
owner whose name appears on the property tax roll, a copy of this resolution, an
invoice for the final assessment against the benefited property, and a contract
agreement form in which the interested party shall elect their option of payment for
such assessment, sign, and return to the Village Treasurer.
Introduced by: Seconded by:
Vote: ayes nays Passed and Approved:
Brian J. Heckendorf – Village President
Attest:
Lisa Heiser – Village Clerk
Proof of Posting:
I the undersigned, certify that I posted this Resolution on bulletin boards at the Village Hall,
Post Office, and one other location in the Village.
Village Official Date
Page 20 of 28
3
Resolution #26-34
Exhibit A - Preliminary Intent to Assess – Eagle Drive, Hawthorn Drive,
Aspen Drive, and Linden Drive
Page 21 of 28
4
Resolution #26-34
Exhibit B – Final Cost and Quantity - Eagle Drive, Hawthorn Drive, Aspen
Drive, and Linden Drive
GREEN = 4" Sidewalk ($ ORANGE = 6" Sidewalk ($8.20)
Tax Parcel ID / Notes Name Address Assess. Width A (ft) Sidewalk Length A(ft) Sidewalk A(sqft) Price/sqft Assess. Width B(ft) Sidewalk Length B(ft) Sidewalk B(sqft) Price/sqft Sidewalk Total Length (ft) Sidewalk Total (sqft) Storm Lateral length(ft) Price/Foot Total Price/sqft for 4" Total Price/sqft for 6" Sidewalk Credit Total Price - Sidewalk Total price - Storm Total Assessed $
196070 DAVID E FIEBIG, DIANE E FIEBIG N165W19944 HICKORY LN
JACKSON, WI 53037 1 102.25 102.25 6.8 1 19.83 19.83 8.2 122.08 122.08 No Storm Lateral $24.70 $695.30 $162.61 $0.00 $857.91 $0.00 $857.91
196071 DUSTIN FORD W198N16533 LINDEN DR
JACKSON, WI 53037 1 61 61 6.8 1 19.17 19.17 8.2 80.17 80.17 83.00 $24.70 $414.80 $157.19 $0.00 $571.99 $2,050.10 $2,622.09
196072 MICHAEL KUBCZAK & JILL KINGERY W198N16545 LINDEN DR
JACKSON, WI 53037-0000 1 61.25 61.25 6.8 1 18.5 18.5 8.2 79.75 79.75 75.00 $24.70 $416.50 $151.70 $0.00 $568.20 $1,852.50 $2,420.70
196073 DARREL D WELDY, DONNA L WELDY W198N16557 LINDEN DR
JACKSON, WI 53037 1 61.33 61.33 6.8 1 18.5 18.5 8.2 79.83 79.83 119.00 $24.70 $417.04 $151.70 $0.00 $568.74 $2,939.30 $3,508.04
196074 DANIEL R REIK, SARAH M REIK W198N16569 LINDEN DR
JACKSON, WI 53037-0000 1 62.5 62.5 6.8 1 17.5 17.5 8.2 80.00 80.00 64.50 $24.70 $425.00 $143.50 $0.00 $568.50 $1,593.15 $2,161.65
196075 ROBERT J HEARLEY W198N16581 LINDEN DR
JACKSON, WI 53037-0000 5 40.5 202.5 6.8 5 25.5 127.5 8.2 66.00 330.00 119.00 $24.70 $1,377.00 $1,045.50 -$700.00 $2,422.50 $2,939.30 $4,661.80
196075 ROBERT J HEARLEY W198N16581 LINDEN DR
JACKSON, WI 53037-0000 1 20.75 20.75 6.8 1 0 0 8.2 20.75 20.75 0.00 $0.00 $141.10 $0.00 $0.00 $141.10 $0.00 $141.10
196040 JENNIFER FISHER W198N16518 LINDEN DR
JACKSON, WI 53037 1 34.67 34.67 6.8 1 0 0 8.2 34.67 34.67 No Storm Lateral $24.70 $235.76 $0.00 $0.00 $235.76 $0.00 $235.76
196039 KURT E MACIEJCZAK, MARY B
MACIEJCZAK
W198N16528 LINDEN DR
JACKSON, WI 53037 1 63 63 6.8 1 17 17 8.2 80.00 80.00 64.00 $24.70 $428.40 $139.40 $0.00 $567.80 $1,580.80 $2,148.60
196038 KELLY A MAAS W198N16538 LINDEN DR
JACKSON, WI 53037 1 56 56 6.8 1 24 24 8.2 80.00 80.00 82.00 $24.70 $380.80 $196.80 $0.00 $577.60 $2,025.40 $2,603.00
196037 JOANNE LYNNE GONZALES W198N16548 LINDEN DR
JACKSON, WI 53037 1 62.17 62.17 6.8 1 17.5 17.5 8.2 79.67 79.67 53.00 $24.70 $422.76 $143.50 $0.00 $566.26 $1,309.10 $1,875.36
196036
HAROLD F KEHRER REVOCABLE LIV
TRUST, ANNETTE M SCHAMBURECK
KEHRER REVOCABLE LIV TRUST
W198N16558 LINDEN DR
JACKSON, WI 53037 1 62.75 62.75 6.8 1 17.25 17.25 8.2 80.00 80.00 57.00 $24.70 $426.70 $141.45 $0.00 $568.15 $1,407.90 $1,976.05
196035 ROBERT G KREZMAN, MICHELLE M
KREZMAN
W198N16568 LINDEN DR
JACKSON, WI 53037-0000 1 60.83 60.83 6.8 1 19 19 8.2 79.83 79.83 54.50 $24.70 $413.64 $155.80 $0.00 $569.44 $1,346.15 $1,915.59
196034 LEE A RICHARD, LINDA S RICHARD W198N16578 LINDEN DR
JACKSON, WI 53037-0000 5 36.83 184.15 6.8 5 27.5 137.5 8.2 64.33 321.65 77.00 $24.70 $1,252.22 $1,127.50 -$700.00 $2,379.72 $1,901.90 $3,581.62
196034 LEE A RICHARD, LINDA S RICHARD W198N16578 LINDEN DR
JACKSON, WI 53037-0000 1 15.75 15.75 6.8 1 0 0 8.2 15.75 15.75 0.00 $0.00 $107.10 $0.00 $0.00 $107.10 $0.00 $107.10
196027 RICHARD J DUQUAINE, DENISE M
DUQUAINE
W197N16511 ASPEN DR
JACKSON, WI 53037-0000 1 130 130 6.8 1 24.17 24.17 8.2 154.17 154.17 No Storm Lateral $24.70 $884.00 $198.19 $0.00 $1,082.19 $0.00 $1,082.19
196028 NICOLE GUHL W197N16531 ASPEN DR
JACKSON, WI 53037 1 60.83 60.83 6.8 1 19.5 19.5 8.2 80.33 80.33 127.00 $24.70 $413.64 $159.90 $0.00 $573.54 $3,136.90 $3,710.44
196029 ZACHARY R CLEMONS, KAYLA R
CLEMONS
W197N16551 ASPEN DR
JACKSON, WI 53037 1 60.33 60.33 6.8 1 20 20 8.2 80.33 80.33 81.50 $24.70 $410.24 $164.00 $0.00 $574.24 $2,013.05 $2,587.29
196030 ALAN C FELDER, GENA M FELDER W197N16561 ASPEN DR
JACKSON, WI 53037-0000 1 61.33 61.33 6.8 1 18.5 18.5 8.2 79.83 79.83 73.00 $24.70 $417.04 $151.70 $0.00 $568.74 $1,803.10 $2,371.84
196031 DALE L KAETTERHENRY REV TR,
CAROL L KAETTERHENRY REV TR
W197N16571 ASPEN DR
JACKSON, WI 53027 1 56 56 6.8 1 24 24 8.2 80.00 80.00 86.60 $24.70 $380.80 $196.80 $0.00 $577.60 $2,139.02 $2,716.62
196032 CARRIE A FRAKES W197N16581 ASPEN DR
JACKSON, WI 53037 1 62 62 6.8 1 18 18 8.2 80.00 80.00 115.00 $24.70 $421.60 $147.60 $0.00 $569.20 $2,840.50 $3,409.70
196033 ERIC J MOSGALLER W197N16591 ASPEN DR
JACKSON, WI 53037-0000 5 48 240 6.8 5 19.83 99.15 8.2 67.83 339.15 89.50 $24.70 $1,632.00 $813.03 -$700.00 $2,445.03 $2,210.65 $3,955.68
196033 ERIC J MOSGALLER W197N16591 ASPEN DR
JACKSON, WI 53037-0000 1 21.67 21.67 6.8 1 0 0 8.2 21.67 21.67 0.00 $0.00 $147.36 $0.00 $0.00 $147.36 $0.00 $147.36
196011 LEE R ZACHARYASZ, LISA B
ZACHARYASZ
W197N16508 ASPEN DR
JACKSON, WI 53037-0000 1 71 71 6.8 1 18.5 18.5 8.2 89.50 89.50 No Storm Lateral $24.70 $482.80 $151.70 $0.00 $634.50 $0.00 $634.50
196012 MICHAEL J GARBERS, BRIANA N
GARBERS
W197N16518 ASPEN DR
JACKSON, WI 53037 1 64.5 64.5 6.8 1 17.83 17.83 8.2 82.33 82.33 56.00 $24.70 $438.60 $146.21 $0.00 $584.81 $1,383.20 $1,968.01
196013 DOUGLAS A KEHRING, LINDA A
KEHRING
W197N16528 ASPEN DR
JACKSON, WI 53037-0000 1 65.17 65.17 6.8 1 17.25 17.25 8.2 82.42 82.42 56.00 $24.70 $443.16 $141.45 $0.00 $584.61 $1,383.20 $1,967.81
196014 CHRISTOPHER H VESCHE, KRISTINE J
VESCHE
W197N16548 ASPEN DR
JACKSON, WI 53037-0000 1 64.5 64.5 6.8 1 17 17 8.2 81.50 81.50 24.50 $24.70 $438.60 $139.40 $0.00 $578.00 $605.15 $1,183.15
196015 MICHAEL E KELLEY W197N16558 ASPEN DR
JACKSON, WI 53037-0000 1 64.5 64.5 6.8 1 18 18 8.2 82.50 82.50 67.00 $24.70 $438.60 $147.60 $0.00 $586.20 $1,654.90 $2,241.10
196016 NICK HIDDE, HEATHER M SIEWERT W197N16568 ASPEN DR
JACKSON, WI 53037 1 61.33 61.33 6.8 1 18.83 18.83 8.2 80.16 80.16 74.00 $24.70 $417.04 $154.41 $0.00 $571.45 $1,827.80 $2,399.25
196017 FORSHEE LIVING TRUST W197N16578 ASPEN DR
JACKSON, WI 53037-0000 1 61.75 61.75 6.8 1 18 18 8.2 79.75 79.75 66.50 $24.70 $419.90 $147.60 $0.00 $567.50 $1,642.55 $2,210.05
196018 ALEXANDER H WEISHEIM, JANE C
WEISHEIM
W197N16588 ASPEN DR
JACKSON, WI 53037-0000 5 39.83 199.15 6.8 5 28 140 8.2 67.83 339.15 54.00 $24.70 $1,354.22 $1,148.00 -$700.00 $2,502.22 $1,333.80 $3,136.02
196018 ALEXANDER H WEISHEIM, JANE C
WEISHEIM
W197N16588 ASPEN DR
JACKSON, WI 53037-0000 1 12.75 12.75 6.8 1 0 0 8.2 12.75 12.75 0.00 $0.00 $86.70 $0.00 $0.00 $86.70 $0.00 $86.70
196026 NICHOLAS SCHRAM, ARIANA
SCHRAM
W196N16501 HAWTHORN DR
JACKSON, WI 53037 1 122.5 122.5 6.8 1 23.75 23.75 8.2 146.25 146.25 44.00 $24.70 $833.00 $194.75 $0.00 $1,027.75 $1,086.80 $2,114.55
196025 JEFFREY L STEVENS, LANA P STEVENS W196N16521 HAWTHORN DR
JACKSON, WI 53037-0000 1 65 65 6.8 1 18.67 18.67 8.2 83.67 83.67 84.50 $24.70 $442.00 $153.09 $0.00 $595.09 $2,087.15 $2,682.24
196024 MICHAEL D MARSHALL FAMILY TR,
SARAH E MARSHALL FAMILY TR
W196N16531 HAWTHORN DR
JACKSON, WI 53037 1 61.83 61.83 6.8 1 22 22 8.2 83.83 83.83 98.00 $24.70 $420.44 $180.40 $0.00 $600.84 $2,420.60 $3,021.44
196023 JOEL T ROTGERS, LAURA M ROTGERS W196N16541 HAWTHORN DR
JACKSON, WI 53037 1 64.5 64.5 6.8 1 18 18 8.2 82.50 82.50 80.50 $24.70 $438.60 $147.60 $0.00 $586.20 $1,988.35 $2,574.55
196022 JANET L THOMPSON W196N16561 HAWTHORN DR
JACKSON, WI 53037 1 64.17 64.17 6.8 1 18.5 18.5 8.2 82.67 82.67 39.00 $24.70 $436.36 $151.70 $0.00 $588.06 $963.30 $1,551.36
196021 THOMAS D ANDERSON, MARY ANN T
ANDERSON
W196N16571 HAWTHORN DR
JACKSON, WI 53037-0000 1 62.17 62.17 6.8 1 18 18 8.2 80.17 80.17 78.50 $24.70 $422.76 $147.60 $0.00 $570.36 $1,938.95 $2,509.31
196020 NATHAN DEERING, MARTINA
DEERING
W196N16581 HAWTHORN DR
JACKSON, WI 53037 1 61.83 61.83 6.8 1 18 18 8.2 79.83 79.83 80.00 $24.70 $420.44 $147.60 $0.00 $568.04 $1,976.00 $2,544.04
196019 MARGARET A MILLER, MICHELLE A
NORDLUND
W196N16591 HAWTHORN DR
JACKSON, WI 53037 5 50.17 250.85 6.8 5 19.25 96.25 8.2 69.42 347.10 98.00 $24.70 $1,705.78 $789.25 -$700.00 $2,495.03 $2,420.60 $4,215.63
196019 MARGARET A MILLER, MICHELLE A
NORDLUND
W196N16591 HAWTHORN DR
JACKSON, WI 53037 1 10.67 10.67 6.8 1 0 0 8.2 10.67 10.67 0.00 $0.00 $72.56 $0.00 $0.00 $72.56 $0.00 $72.56
196002 TIMOTHY A P ARE W196N16500 HAWTHORN DR
JACKSON, WI 53037 1 76.5 76.5 6.8 1 23.5 23.5 8.2 100.00 100.00 No Storm Lateral $24.70 $520.20 $192.70 $0.00 $712.90 $0.00 $712.90
196003 ROBERT P HELMINIAK, AMY M
HELMINIAK
W196N16520 HAWTHORN DR
JACKSON, WI 53037-0000 1 61.5 61.5 6.8 1 18.5 18.5 8.2 80.00 80.00 57.50 $24.70 $418.20 $151.70 $0.00 $569.90 $1,420.25 $1,990.15
196004 MICHAEL W PUHL, SHERRI A PUHL W196N16530 HAWTHORN DR
JACKSON, WI 53037 1 63.5 63.5 6.8 1 16.5 16.5 8.2 80.00 80.00 60.00 $24.70 $431.80 $135.30 $0.00 $567.10 $1,482.00 $2,049.10
196005 GREGORY S MANGAN, NANCY C
MANGAN
W196N16540 HAWTHORN DR
JACKSON, WI 53037-0000 1 57 57 6.8 1 22.83 22.83 8.2 79.83 79.83 55.00 $24.70 $387.60 $187.21 $0.00 $574.81 $1,358.50 $1,933.31
196006 RICHARD KUPKA LIVING TRUST,
GEORGIANA KUPKA LIVING TRUST
W196N16550 HAWTHORN DR
JACKSON, WI 53037-0000 1 52.5 52.5 6.8 1 22 22 8.2 74.50 74.50 55.50 $24.70 $357.00 $180.40 $0.00 $537.40 $1,370.85 $1,908.25
196007 JOHN F VOGT REVOCABLE TRUST W196N16560 HAWTHORN DR
JACKSON, WI 53037 1 50.3 50.3 6.8 1 24 24 8.2 74.30 74.30 82.00 $24.70 $342.04 $196.80 $0.00 $538.84 $2,025.40 $2,564.24
196008 JOHN F BERINGER, MARSHA A
BERINGER
W196N16570 HAWTHORN DR
JACKSON, WI 53037-0000 1 60.3 60.3 6.8 1 20 20 8.2 80.30 80.30 56.00 $24.70 $410.04 $164.00 $0.00 $574.04 $1,383.20 $1,957.24
196009 TIMOTHY VERKEN, NICOLE GIERACH
VERKEN
W196N16580 HAWTHORN DR
JACKSON, WI 53037 1 63.25 63.25 6.8 1 17 17 8.2 80.25 80.25 58.50 $24.70 $430.10 $139.40 $0.00 $569.50 $1,444.95 $2,014.45
196010 ROBERT A POLIVKA, NANCY D
POLIVKA
W196N16590 HAWTHORN DR
JACKSON, WI 53037-0000 5 52.5 262.5 6.8 5 20 100 8.2 72.50 362.50 65.50 $24.70 $1,785.00 $820.00 -$700.00 $2,605.00 $1,617.85 $3,522.85
196010 ROBERT A POLIVKA, NANCY D
POLIVKA
W196N16590 HAWTHORN DR
JACKSON, WI 53037-0000 1 11.25 11.25 6.8 1 0 0 8.2 11.25 11.25 0.00 $0.00 $76.50 $0.00 $0.00 $76.50 $0.00 $76.50
019700S STEVEN G STILOSKI, JUDY BOEHM PO BOX 529
JACKSON, WI 53037 5 165 825 6.8 5 30 150 8.2 195.00 975.00 No Storm Lateral $24.70 $5,610.00 $1,230.00 $0.00 $6,840.00 $0.00 $6,840.00
019700R BUCK PROPERTIES LLC W194N16747 EAGLE DR STE N
JACKSON, WI 53037-0000 5 127.17 635.85 6.8 5 0 0 8.2 127.17 635.85 No Storm Lateral $24.70 $4,323.78 $0.00 $0.00 $4,323.78 $0.00 $4,323.78
019700P001 CLAYPOOL PROPERTIES 3443 TAMARACK TRL
WEST BEND, WI 53095-0000 5 131.5 657.5 6.8 5 33.3 166.5 8.2 164.80 824.00 No Storm Lateral $24.70 $4,471.00 $1,365.30 $0.00 $5,836.30 $0.00 $5,836.30
Assessed Total
Linear Feet
Assessed Total
Square Feet Total Lateral Feet GRAND TOTAL $
6108.18 1755.98 4,284.64 7,864.16 2911.10 $1,185.60 $41,535.62 $14,399.04 -$4,200.00 $55,934.66 $71,904.17 $123,638.83
2026 Final Assessment Spreadsheet - Eagle, Hawthorn, Aspen, and Linden Drive
YELLOW = Partial Existing Sidewalk
Page 22 of 28
1
Public Works Report
October 27, 2026
Wastewater Treatment Plant - Designed Capacity – 1.69 million gallons per day
Peak Flow Capacity – 6.0 million gallons per day
Wastewater Treatment Plant Flows - Year 2024
Month Average Daily Flow Minimum Daily Flow Maximum Daily Flow
January 1.337 MGD 0.980 MGD 2.260 MGD
February 1.440 MGD 1.090 MGD 2.250 MGD
March 1.502 MGD 0.950 MGD 2.590 MGD
April 1.427 MGD 0.980 MGD 3.220 MGD
May 1.325 MGD 0.980 MGD 1.990 MGD
June 1.544 MGD 0.980 MGD 2.500 MGD
July 1.146 MGD 0.850 MGD 1.560 MGD
August 1.027 MGD 0.760 MGD 1.550 MGD
September 0.884 MGD 0.700 MGD 1.400 MGD
October 0.795 MGD 0.670 MGD 0.990 MGD
November 0.997 MGD 0.720 MGD 1.610 MGD
December 0.936 MGD 0.730 MGD 1.460 MGD
Wastewater Treatment Plant Flows - Year 2025
Month Average Daily Flow Minimum Daily Flow Maximum Daily Flow
January 0.881 MGD 0.750 MGD 1.160 MGD
February 0.891 MGD 0.730 MGD 1.030 MGD
March 1.356 MGD 0.840 MGD 2.300 MGD
April 1.443 MGD 1.000 MGD 3.530 MGD
May 1.279 MGD 0.830 MGD 2.530 MGD
June 1.100 MGD 0.830 MGD 1.890 MGD
July 0.993 MGD 0.860 MGD 1.280 MGD
August 1.446 MGD 0.800 MGD 5.670 MGD
September 0.953 MGD 0.820 MGD 1.210 MGD
October 1.038 MGD 0.730 MGD 1.420 MGD
November 0.929 MGD 0.760 MGD 1.080 MGD
December 1.075 MGD 0.780 MGD 1.560 MGD
Wastewater Treatment Plant Flows - Year 2026
Month Average Daily Flow Minimum Daily Flow Maximum Daily Flow
January 1.203 MGD 0.830 MGD 1.700 MGD
February 1.020 MGD 0.800 MGD 1.480 MGD
March 1.532 MGD 0.970 MGD 2.250 MGD
April 2.095 MGD 1.230 MPD 4.300 MGD
May 1.038 MGD 0.830 MGD 1.260 MGD
June 1.030 MGD 0.880 MGD 1.260 MGD
July 1.080 MGD 0.830 MGD 1.490 MGD
August 1.306 MGD 0.950 MGD 2.380 MGD
September 1.342 MGD 1.020 MGD 2.400 MGD
October
November
December
Page 23 of 28
2
2024 Wastewater Treatment Plant – Holding & Septage Receiving Annually by Month
Month Holdings Grease Grease Decant Septage Septage Decant Total Billed
January 1,240,050
Gallons
500
Gallons
62,900 Gallons $14,003.00
February 1,236,550
Gallons
2,300
Gallons
63,100 Gallons $14,081.00
March 1,139,150
Gallons
4,500
Gallons
141,500 Gallons $15,200.25
April 1,135,752
Gallons
3,600
Gallons
225,950 Gallons $17,972.27
May 982,150
Gallons
14,800
Gallons
274,550 Gallons $17,573.25
June 734,178
Gallons
2,000
Gallons
175,950 Gallons $11,860.53
July 1,374,900
Gallons
11,300
Gallons
285,450 Gallons $21,563.25
August 1,362,350
Gallons
15,800
Gallons
272,200 Gallons $21,376.50
Septembe
r
990,600
Gallons
1,000
Gallons
237,550 Gallons $15,904.75
October 1,044,550
Gallons
6,400
Gallons
228,3650 Gallons $16,545.75
November 987,500
Gallons
5,800
Gallons
195,350 Gallons $15,106.75
December 960,550
Gallons
2,750
Gallons
107,300 Gallons $12,453.00
2025 Wastewater Treatment Plant – Holding & Septage Receiving Annually by Month
Month Holdings Grease Grease Decant Septage Septage Decant Total Billed
January 1,008,400
Gallons
1,500
Gallons
40,650 Gallons $11,190.25
February 905,450
Gallons
1,400
Gallons
41,250 Gallons $10,169.75
March 1,237,500
Gallons
3,100
Gallons
72,450 Gallons $14,372.25
April 1,1317,75
0 Gallons
3,200
Gallons
168,650 Gallons $15,545.75
May 1,174,850
Gallons
17,900
Gallons
194,850 Gallons $17,693.75
June 1,084,900
Gallons
15,800
Gallons
223,750 Gallons $17,390.75
July 1,037,150
Gallons
15,000
Gallons
168,550 Gallons $15,485.25
August 1,184,950
Gallons
22,700
Gallons
187,850 Gallons $17,907.75
September 1,292,700
Gallons
800
Gallons
2,500
Gallons
268,400 Gallons $19,819.00
October 1,700,600
Gallons
4,500 Gallons 17,400
Gallons
479,250 Gallons $30,211.25
November 1,592,850
Gallons
8,200
Gallons
297,850 Gallons $23,866.75
December 1,908,200
Gallons
4,250
Gallons
128,650 Gallons $22,553.25
Page 24 of 28
3
2026 Wastewater Treatment Plant – Holding & Septage Receiving Annually by Month
Month Holdings Grease Grease Decant Septage Septage Decant Total Billed
January 1,455,600
Gallons
1,750
Gallons
75,700
Gallons
$16,518.50
February 1,032,250
Gallons
2,000
Gallons
84,200
Gallons
$12,547.50
March 1,239,500
Gallons
4,500
Gallons
89,950
Gallons
$14,913.75
April 1,601,050
Gallons
13,900
Gallons
269,750
Gallons
$23,588.25
May 1,066,950
Gallons
100
Gallons
13,750
Gallons
237,200
Gallons
$17,428.50
June 1,102,400
Gallons
8,500
Gallons
6,000
Gallons
245,300
Gallons
$17,921.50
July 1,069,000
Gallons
1,800
Gallons
16,000
Gallons
336,450
Gallons
$20,133.25
August 936,900
Gallons
14,000
Gallons
221,500
Gallons
$15,746.50
September 1,044,750
Gallons
6,000
Gallons
292,450
Gallons
$18,118.75
October
November
December
Wastewater Treatment Plant – Holding & Septage Receiving Annually
Year
Collected
Amount
Collected
Year
Collected
Amount
Collected
Year
Collected
Amount
Collected
Year
Collected
Amount
Collected
2005 $7,562.01 2006 $101,115.11 2007 $152,201.07 2008 $210,441.47
2009 $183,815.34 2010 $197,653.66 2011 $220,576.28 2012 $236,224.70
2013 $235,336.46 2014 $203,938.32 2015 $210,644.47 2016 $220,473.17
2017 $232,358.23 2018 $245,767.74 2019 $219,822.80 2020 $204,656.11
2021 $209,083.10 2022 $251,109.46 2023 $157,332.20 2024 $194,954.27
2025 $217,002.75 2026
Municipal Well Pump Information – Well Number and Pumping Capacity
Well #1 400 GPM Well #3 900 GPM Well #4 1,200 GPM Well #5 1,100 GPM Well #6 800 GPM
Summary of Municipal Water Consumption
2010 Total Annual Pumpage 239,326,000 Gallons 2011 Total Annual Pumpage 240,268,000 Gallons
2012 Total Annual Pumpage 253,492,000 Gallons 2013 Total Annual Pumpage 228,371,000 Gallons
2014 Total Annual Pumpage 230,973,000 Gallons 2015 Total Annual Pumpage 222,621,000 Gallons
2016 Total Annual Pumpage 254,531,000 Gallons 2017 Total Annual Pumpage 251,387,000 Gallons
2018 Total Annual Pumpage 241,322,000 Gallons 2019 Total Annual Pumpage 253,427,000 Gallons
2020 Total Annual Pumpage 259,413,000 Gallons 2021 Total Annual Pumpage 242,216,000 Gallons
2022 Total Annual Pumpage 222,033,000 Gallons 2023 Total Annual Pumpage 229,997,000 Gallons
2024 Total Annual Pumpage 233,155,000 Gallons 2025 Total Annual Pumpage 249,538,201 Gallons
2026 Total Annual Pumpage 123,123,123 gallons
Page 25 of 28
4
Municipal Water Consumption - Year 2024
Month Average Daily
Pumpage
Highest Daily
Pumpage
Total Monthly
Pumpage
January 0.560 MGD 0.733 MGD 17.486 MG
February 0.555 MGD 0.711 MGD 16.082 MG
March 0.542 MGD 0.731 MGD 16.797 MG
April 0.609 MGD 0.903 MGD 18.274 MG
May 0.610 MGD 0.762 MGD 18.906 MG
June 0.662 MGD 0.817 MGD 19.855 MG
July 0.731 MGD 0.988 MGD 22.676 MG
August 0.694 MGD 0.881 MGD 21.506 MG
September 0.740 MGD 0.972 MGD 22.187 MG
October 0.723 MGD 1.021 MGD 22.407 MG
November 0.565 MGD 0.816 MGD 17.529 MG
December 0.627 MGD 0.889 MGD 19.450 MG
Municipal Water Consumption - Year 2025
Month Average Daily
Pumpage
Highest Daily
Pumpage
Total Monthly
Pumpage
January 0.680 MGD 0.781 MGD 18.847 MG
February 0.683 MGD 0.820 MGD 19.115 MG
March 0.694 MGD 0.769 MGD 21.201 MG
April 0.707 MGD 1.122 MGD 21.212 MG
May 0.716 MGD 0.917 MGD 22.210 MG
June 0.842 MGD 1.000 MGD 25.265 MG
July 0.856 MGD 1.066 MGD 26.550 MG
August 0.785 MGD 0.970 MGD 24.209 MG
September 0.838 MGD 1.269 MGD 25.126 MG
October 0.814 MGD 1.196 MGD 25.219 MG
November 0.702 MGD 0.912 MGD 21.069 MG
December 0.668 MGD 0.842 MGD 20.695 MG
Municipal Water Consumption - Year 2026
Month Average Daily
Pumpage
Highest Daily
Pumpage
Total Monthly
Pumpage
January 0.669 MGD 0.816 MGD 20.733 MG
February 0.619 MGD 0.836 MGD 18.583 MG
March 0.669 MGD 0.964 MGD 20.551 MG
April 0.725 MGD 0.867 MGD 21.759 MG
May 0.794 MGD 1.054 MGD 24.612 MG
June 0.849 MGD 1.095 MGD 25.460 MG
July 0.922 MGD 1.262 MGD 28.569 MG
August 0.760 MGD 0.910 MGD 23.568 MG
September 0.712 MGD 0.883 MGD 21.368 MG
October
November
December
Page 26 of 28
5
Midwest Fiber Network – Fiber to Homes
There are no new updates currently. Installation of Midwest Fiber Network equipment continues throughout
the Village, with work progressing steadily. Crews remain active in multiple areas, and significant progress
has been made.
Midwest Fiber Network – Upgrade to Village Facilities
Following the June 9 Board meeting, the proposals were approved and forwarded to Midwest Fiber Network
and Pros4 Technology. Pros4 Technology has been on-site and has installed the majority of the cameras
and wiring needed at Jackson Park and Hickory Lane Park. Midwest Fiber Network has also been on-site to
determine the fiber routing and installation points at each facility. Recently, updated plan sets, right-of-way
permits, and official service and operational agreements were received and are currently under review. I
anticipate Midwest Fiber Network will break ground this fall, with the project expected to be completed in the
spring, weather permitting.
Cedar Run Park – Dog Park Project
Staff are putting the finishing touches on the dog park! The grass is growing well and is nearing the point
where the gates may be unlocked by the end of the month to allow for public use, weather permitting. Staff
are also completing the final details, including installing waste receptacles, picnic tables, and the park sign.
We anticipate completing these items within the next 4–6 weeks, at which time an official soft opening will
take place, also weather permitting. We look forward to seeing the park completed and welcoming
community members and their four-legged friends to enjoy this new space. We’re excited to see how the
community makes the park its own and what fun activities and events may take place in the future!
WWTP Aeration Basin Upgrades / Service Building Upgrades
There are no significant new updates at this time. The Aeration Basin Upgrades and the 2027 Service
Building Upgrade Project are approximately 90% complete with the evaluation and design phases. Both
projects remain on schedule and have been submitted to the Wisconsin Department of Natural Resources
(DNR) for review. Additionally, The Village has applied for the 2027 Clean Water Fund Loan Program to
help finance these improvements. The Wisconsin DNR will publish the final funding list in December 2026.
2026 Street Reconstruction Projects
Construction is nearing completion, and all areas have been opened to the public. A few remaining punch-
list items involving landscaping, mailboxes, and signage are being addressed. Streetlight poles were
delayed during the ordering process and are anticipated to arrive on-site in December, with installation to
follow. Restoration work associated with the light pole installation is scheduled for the spring. Temporary
lighting has been installed in the interim until the permanent streetlighting system is complete.
2026 Streetlight Project
Following approval by the Village Board in August, the project was awarded to MP Systems. A
preconstruction meeting has been held, and the light poles and luminaires have been ordered, with delivery
expected in December. Construction may begin this fall; however, the timing has not yet been confirmed.
Depending on weather conditions, construction may need to be postponed until spring.
Eagle Drive – North Segment
Following approval from the Village Board, this project was completed in July by Stark Pavement
Corporation. The line painting was completed by Washington County. This much-needed improvement has
been well received by the public.
Tower Drive – Water Tower Rehabilitation Project
USG Water Works has successfully completed the rehabilitation project of the Tower Drive Water Tower.
The project included a full sandblast and repainting of both the interior dry section and the interior wet
section of the tower. Additionally, the exterior of the tower received minor spot repairs, followed by primer
Page 27 of 28
6
application and complete exterior repainting. Safe water samples were collected and approved, allowing the
tower to be returned to service and reconnected to the water distribution system as of July 18.
Maple Fields Subdivision
Phase 3 - No major updates at this time. All underground utility work, curb and gutter installation, binder
course asphalt paving, and sidewalk construction have been completed. We Energies and Midwest Fiber
Network have been on site performing underground utility work. Plans and permits have been received for
nine new homes.
Respectfully submitted, Jack Straehler, Director of Public Works
Page 28 of 28
Source: Village of Jackson website. First collected Oct 27, 2026.