RecordWell Data

Board of Public Works — Agenda Packet

Village of Jackson · Washington County · Board of Public Works · meeting of Oct 27, 2026 · Agenda packets

Open the original document More from Village of Jackson

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

October 27, 2026 Village of Jackson - Board of Public Works Meeting Agenda VILLAGE OF JACKSON BOARD OF PUBLIC WORKS MEETING AGENDA Tuesday, October 27, 2026 at 6:00 PM Jackson Municipal Complex Village Board Room N168W19851 Main Street Jackson, WI 53037 1. Call to Order and Roll Call 2. Citizens/Village Staff to address the Board of Public Works (Please sign in with the Clerk prior to speaking. Please note this is a business meeting, not a public hearing. People wishing to speak on an item on the agenda should present their comments under this agenda item. Each commenter will be limited to a total of 2 minutes.) 3. Approval of Minutes of the Board of Public Works Meeting of July 28, 2026 4. Pay Request #5 – 2026 Street Improvement Projects - Eagle Drive, Hawthorn Drive, Aspen Drive, and Linden Drive - Vinton Construction in the amount of $451,515.66 5. Reimbursement Request #17 - Final - 2024 Wastewater Treatment Plant Tertiary Filters and UV Disinfection Project - Clean Water Fund Loan in the amount of $6,424.24 6. Resolution #26-33 - Authorization to Increase Sewer Utility Rates Effective January 1, 2027 7. Resolution #26-34 - Final Resolution Authorizing the Levy of Special Assessments Against Benefited Property Associated With the 2026 Eagle, Hawthorn, Aspen, and Linden Drive Reconstruction Project 8. Director of Public Works Report 9. Adjourn Persons with disabilities requiring special accommodations for attendance at the meeting should contact the Administration Department at the Jackson Municipal Complex at least one (1) business day prior to the meeting. It is possible that members of the Village Board may attend the above meeting. No action will be taken by any governmental body at this meeting other than the governmental body specifically referred to in this meeting notice. This notice is given so that members of the Village Board may attend the meeting without violating the open meeting law. Page 1 of 28 July 28, 2026 Village of Jackson - Board of Public Works Meeting Minutes Page 1 of 3 VILLAGE OF JACKSON BOARD OF PUBLIC WORKS MEETING Tuesday, July 28, 2026 at 6:00 PM Minutes 1. Call to Order and Roll Call The meeting was called to order at 6:06 PM by President Heckendorf. Members Present: President Brian Heckendorf, Trustee Tim Engelhardt, Trustee John Schlenz, Stephanie Egner, Jeff Mitchell, and Josh Sandleback Members Excused: Ryan Ganshow Members Absent: None Staff Present: Administrator Jen Heidtke, Public Works Director Jack Straehler, and Clerk Lisa Heiser 2. Citizens/Village Staff to address the Board of Public Works (Please sign-in with the Clerk prior to speaking. Please note this is a business meeting, not a public hearing. People wishing to speak on an item on the agenda should present their comments under this agenda item. Each commenter will be limited to a total of 2 minutes.) None. 3. Approval of Minutes of the Board of Public Works Meeting of June 30, 2026 The motion to approve minutes for the Board of Public Works Meeting of June 30, 2026, was made by Tr. Schlenz and seconded by Tr. Engelhardt. Vote: 6 ayes, 0 nays. Motion carried. 4. Presentation by MSA Engineering - Review 2025 Dog Park at Cedar Creek Park MSA Engineering provided an update on construction progress, the anticipated completion timeline, and the financial impact to the Village for the Cedar Creek Dog Park and answered questions from the committee. 5. Presentation and Discussion - 2026 Budget Review and Proposed 2027 Budget - Public Works, Water, and Wastewater Utilities Director Straehler provided an update on the status of the 2026 budget, including projected year-end outcomes and anticipated overages, as well as key revisions in the 2027 draft budget which will be presented to the Village Board in August. The motion to recommend the Village Board approve the proposed draft 2027 budgets for Engineering, Streets, Park, Trash, Water, and Wastewater was made by J. Sandleback and seconded by J. Mitchell. Vote: 6 ayes, 0 nays. Motion carried. DRAFT Page 2 of 28 July 28, 2026 Village of Jackson - Board of Public Works Meeting Minutes Page 2 of 3 6. Pay Request #2 – 2026 Street Improvement Projects - Eagle Drive, Hawthorn Drive, Aspen Drive, and Linden Drive - Vinton Construction in the amount of $239,438.64 The motion to recommend that the Budget and Finance Committee and Village Board approve Pay Request #2 for Vinton Construction in the amount of $239,438.64 was made by Tr. Engelhardt and seconded by Tr. Schlenz. S. Egner left the boardroom at 6:44 PM. Vote: 5 ayes, 0 nays. Motion carried. S. Egner was absent during consideration and vote. 7. Pay Request #2 - Final - 2026 Wastewater Treatment Plant Fill Removal Project – BMCI Construction in the amount of $6,252.75 The motion to recommend that the Budget and Finance Committee and Village Board approve Pay Request #2 (Final) for BMCI Construction in the amount of $6,252.75 was made by Tr. Engelhardt and seconded by J. Mitchell. Vote: 5 ayes, 0 nays. Motion carried. S. Egner was absent during consideration and vote. 8. Review of Bids - 2026 Streetlight Improvement Project - Ridgeway Drive, Chestnut Court, and Hickory Lane The motion to recommend that the Budget and Finance Committee and Village Board award the contract for the 2026 Streetlight Improvement Projects, including Ridgeway Drive, Chestnut Court, and Hickory Lane, to MP Systems in the amount of $229,596.09 was made by Tr. Schlenz and seconded by Tr. Engelhardt. Vote: 5 ayes, 0 nays. Motion carried. S. Egner was absent during consideration and vote. 9. Review Design and Engineering Services Proposals - 2027 Street Improvement Projects - Jackson Drive and Georgetown Drive The motion to recommend that the Budget and Finance and Village Board award the design and engineering contract for the 2027 Street Improvement Projects, including Jackson Drive and Georgetown Drive, to Cedar Corporation in the amount of $38,300 was made by Tr. Schlenz and seconded by Tr. Engelhardt. S. Egner returned to the Boardroom at 6:48 PM. Vote: 6 ayes, 0 nays. Motion carried. 10. WE Energies Easement Agreement for the Relocation of Utilities on Eagle Drive The motion to recommend that the Village Board approve the easement request for W194N16660 Eagle Drive (Tax Key V3-019700E) and the adjacent lot Tax Key V3- 019800A was made by Tr. Engelhardt and seconded by J. Mitchell. Vote: 6 ayes, 0 nays. Motion carried. DRAFT Page 3 of 28 July 28, 2026 Village of Jackson - Board of Public Works Meeting Minutes Page 3 of 3 11. Director of Public Works Report Director Straehler provided a brief summary of the items outlined in the report and answered questions from the committee. The motion to place the July 2026 Director's Report on file was made by Pr. Heckendorf and seconded by Tr. Engelhardt. Vote: 6 ayes, 0 nays. Motion carried. 12. Adjourn The motion to adjourn the meeting was made by J. Mitchell and seconded by J. Sandleback. Vote: 6 ayes, 0 nays. Motion carried. The meeting adjourned at 7:04 PM. Respectfully Submitted, Lisa Heiser Village Clerk Village of Jackson DRAFT Page 4 of 28 Taking the lead in Washington County STAFF MEMO Village of Jackson Public Works To: Brian Heckendorf, Village President Jen Heidtke, Village Administrator CC: Budget and Finance; Village Board From: Jack Straehler, Director of Public Works Subject: Pay Request #5 - 2026 Street Improvement Projects - Eagle Drive, Hawthorn Drive, Aspen Drive, and Linden Drive - Vinton Construction in the amount of $451,515.66 Meeting Date: October 27, 2026 - Board of Public Works Background and Analysis: This memo is to inform the Board of Pay Request # 5 from Vinton Construction in the amount of $451,515.66 for work completed on the 2026 Street Improvement Projects, which include Eagle Drive, Hawthorn Drive, Aspen Drive, and Linden Drive. The work has been reviewed and verified for accuracy and completion in accordance with the project contract documents and has been found to be acceptable. Funding for this payment will come from the following accounts: 600-00-56700-400-000 (Capital Projects Repairs/Construction - 54%) $243,818.46 300-00-17600-000-380 (Sewer Construction Work - 39%) $176,091.11 200-00-18600-395-000 (Water Construction Work - 7%) $31,606.09 If you have any questions, please let me know. JS Recommendation: Board of Public Works recommends the Budget and Finance Committee and Village Board approve Pay Request #5 for Vinton Construction in the amount of $ 451,515.66. Page 5 of 28 Cedarburg • Green Bay • Madison • Menomonie Community Infrastructure • Architecture • Environmental Services W61N497 Washington Avenue Cedarburg, WI 53012 262-204-2360 www.cedarcorp.com October 15, 2026 Village of Jackson N168 W20733 Main Street PO Box 637 Jackson, WI 53037 Attn: Mr. Jack Straehler II, Director of Public Works Subject: Contractor’s Application for Payment No. 5 Eagle Drive, Hawthorn Drive, Aspen Drive & Linden Drive Reconstruction 2026 Cedar Project No. 05789-0029 Dear Mr. Straehler: Enclosed for your use in payment to Vinton Construction Company in the amount of $451,515.66 is Contractor’s Application for Payment No. 5. Following your review and approval, please complete the application for payment forms within the areas reserved for the Owner. Thereafter, retain one copy for your records, provide the second copy to the Contractor with payment and provide the third copy to our office. Should you have any questions, please feel free to contact me at our Cedarburg office. Sincerely, CEDAR CORPORATION Douglas T. Kroes Senior Construction Manager Enclosed: Contractor’s Application for Payment No. 5 Cc: Grant Manion, Vinton Construction Company Page 6 of 28 10/12/26 10/15/26 Page 7 of 28 Unit Price Progress Estimate B C D E F G H I J Quantity Amount Quantity Amount Quantity Amount Quantity Amount 100-01 1 LS $5,750.00 1 $5,750.00 1 $5,750.00 100.0% 100-02 3790 LF $4.60 3790 $17,434.00 3790 $17,434.00 100.0% 100-03 3805 SY $7.16 3805 $27,243.80 3805 $27,243.80 100.0% 100-04 7685 CY $26.97 7685 $207,264.45 7685 $207,264.45 100.0% 100-05 755 CY $24.00 755 $18,120.00 1965.07 $47,161.68 2720.07 $65,281.68 360.3% 100-06 1685 SY $7.12 842 $5,995.04 843 $6,002.16 1685 $11,997.20 100.0% 100-07 795 TON $16.50 664.53 $10,964.75 254.66 $4,201.89 919.19 $15,166.64 115.6% 100-08 7800 TON $16.50 7800 $128,700.00 1341.82 $22,140.03 9141.82 $150,840.03 117.2% 100-09 1660 TON $21.37 2381.3 $50,888.38 2,381.30 $50,888.38 143.5% 100-10 1755 TON $69.00 1203.05 $83,010.45 692.32 $47,770.08 1895.37 $130,780.53 108.0% 100-11 1170 TON $65.90 799.9 $52,713.41 370.1 $24,389.59 1170 $77,103.00 100.0% 100-12 545 TON $98.20 545 $53,519.00 545 100-13 10 SY $59.00 10 $590.00 10 $590.00 100.0% 100-14 40 LF $50.00 40 $2,000.00 40 $2,000.00 100.0% 100-15 5405 LF $18.55 5404 $100,244.20 319.3 $5,923.02 5723.3 $106,167.22 105.9% 100-16 60 LF $45.00 60 $2,700.00 60 $2,700.00 100.0% 100-17 23645 SF $6.80 14073 $95,696.40 9009.5 $61,264.60 23082.5 $156,961.00 97.6% 100-18 140 SF $8.20 140 $1,148.00 140 $1,148.00 100.0% 100-19 50 SF $35.00 50 $1,750.00 50 $1,750.00 100.0% 100-20 2605 SY $75.75 2565.55 $194,340.41 2565.55 $194,340.41 98.5% 100-21 8 CY $1,200.00 8 $9,600.00 8 $9,600.00 100.0% 100-22 1 EA $200,000.00 0.85 $170,000.00 0.15 $30,000.00 1 $200,000.00 100.0% 100-23 885 LF $2.11 885 $1,867.35 885 $1,867.35 100.0% 100-24 40 LF $9.06 40 $362.40 40 $362.40 100.0% 100-25 30 EA $34.07 30 $1,022.10 30 $1,022.10 100.0% 100-26 6 EA $104.50 6 $627.00 6 $627.00 100.0% 100-27 10 EA $71.50 10 $715.00 10 $715.00 100.0% 100-28 27 EA $71.50 27 $1,930.50 27 $1,930.50 100.0% 100-29 11400 SY $7.01 5310 $37,223.10 3690 $25,866.90 9000 $63,090.00 78.9% 100-30 2700 SY $8.23 100-31 4 CY $500.00 9 $4,500.00 9 $4,500.00 225.0% 100-32 2380 SY $2.00 7998 $15,996.00 7998 $15,996.00 336.1% 100-33 1 LS $28,000.00 0.85 $23,800.00 0.15 $4,200.00 1 $28,000.00 100.0% 100-34 1 LS $3,500.00 1 $3,500.00 1 $3,500.00 100.0% 100-35 2 EA $7,000.00 100-36 4492 LF $2.40 4492 $10,780.80 4492 $10,780.80 100.0% 100-37 17 LF $16.00 17 $272.00 17 $272.00 100.0% 100-38 12 LF $8.00 12 $96.00 12 $96.00 100.0% 100-39 145 LF $10.75 145 $1,558.75 145 $1,558.75 100.0% 100-40 675 LF $2.50 675 $1,687.50 675 $1,687.50 100.0% Curb Ramp Detectable Warning Field Natural Patina Concrete Driveway 7-Inch Concrete Surface Drains Mobilization Silt Fence Topsoil, Seed, Fertilizer, and Erosion Mat Temporary Ditch Checks Culvert Pipe Checks Inlet Protection Type A Inlet Protection Type B Inlet Protection Type C Sawing Asphalt HMA Pavement 3 LT 58-28 S HMA Pavement 4 LT 58-28 S Asphaltic Surface Driveways Asphaltic Flumes Concrete Curb & Gutter 18-Inch Type D Concrete Curb Pedestrian Concrete Sidewalk 4-Inch Concrete Sidewalk 6-Inch Clearing & Grubbing Removing Curb & Gutter Removing Concrete Driveways and Sidewalk Excavation Common Excavation Below Subgrade Pulverize and Relay Base Aggregate Dense 3/4-Inch Base Aggregate Dense 1 1/4-Inch Base Aggregate Dense 3-Inch Concrete Curb & Gutter 30-Inch Type D % Comp.Bid No. Description Previous Applications This Application Materials Stored Total Completed & Stored to Date (C+E+G) Contractor's Application 5 9/1/26 - 9/30/26 October 13, 2026 Eagle Drive, Hawthorn Drive, Aspen Drive, Linden Drive A Item Estimated Bid Quantity Unit Price Quantity Completed Project: Application Period: Application Number: Application Date: Topsoil, Seed, Fertilizer, and Mulch Riprap Medium w/ Geotextile Fabric Type HR Geotextile Fabric Type SAS Traffic Control Permanent Signing Rectangular Rapid Flashing Beacon (STA 67+18) Marking Line Epoxy 4-Inch Marking Stop Line Epoxy 18-Inch Marking Diagonal Epoxy 12-Inch Marking Crosswalk Epoxy Transverse Line 6-Inch 00 62 76 - 2 10/12/26 Page 8 of 28 Unit Price Progress Estimate B C D E F G H I J Quantity Amount Quantity Amount Quantity Amount Quantity Amount % Comp.Bid No. Description Previous Applications This Application Materials Stored Total Completed & Stored to Date (C+E+G) Contractor's Application 5 9/1/26 - 9/30/26 October 13, 2026 Eagle Drive, Hawthorn Drive, Aspen Drive, Linden Drive A Item Estimated Bid Quantity Unit Price Quantity Completed Project: Application Period: Application Number: Application Date: 100-41 1085 LF $3.00 1085 $3,255.00 1085 $3,255.00 100.0% 200-01 12 EA $400.00 4 $1,600.00 6 $2,400.00 10 $4,000.00 83.3% 200-02 3 EA $400.00 3 $1,200.00 3 $1,200.00 100.0% 200-03 254 LF $30.00 237 $7,110.00 3 $90.00 240 $7,200.00 94.5% 200-04 1 CY $400.00 1 $400.00 1 $400.00 100.0% 200-05 1 EA $300.00 1 $300.00 1 $300.00 100.0% 200-06 8 EA $400.00 8 $3,200.00 8 $3,200.00 100.0% 200-07 6 EA $520.00 5 $2,600.00 5 $2,600.00 83.3% 200-08 1 EA $1,840.00 1 $1,840.00 1 $1,840.00 100.0% 200-09 196 LF $56.07 198 $11,101.86 198 $11,101.86 101.0% 200-10 907 LF $64.52 893 $57,616.36 5 $322.60 898 $57,938.96 99.0% 200-11 681 LF $66.68 601 $40,074.68 82 $5,467.76 683 $45,542.44 100.3% 200-12 291 LF $121.54 290.5 $35,307.37 2.5 $303.85 293 $35,611.22 100.7% 200-13 98 LF $142.59 98 $13,973.82 98 $13,973.82 100.0% 200-14 70 LF $51.81 69 $3,574.89 69 $3,574.89 98.6% 200-15 1063 LF $52.10 1063 $55,382.30 1063 $55,382.30 100.0% 200-16 29 LF $57.68 29 $1,672.72 29 $1,672.72 100.0% 200-17 2807 LF $24.70 2917.1 $72,052.37 2917.1 $72,052.37 103.9% 200-18 151 LF $50.00 120 $6,000.00 120 $6,000.00 79.5% 200-19 15 EA $3,784.00 15 $56,760.00 15 $56,760.00 100.0% 200-20 7 EA $4,200.00 7 $29,400.00 7 $29,400.00 100.0% 200-21 3 EA $5,000.00 3 $15,000.00 3 $15,000.00 100.0% 200-22 7 EA $3,075.95 7 $21,531.65 7 $21,531.65 100.0% 200-23 2 EA $950.00 2 $1,900.00 2 $1,900.00 100.0% 200-24 33 EA $100.00 36 $3,600.00 36 $3,600.00 109.1% 200-25 1 EA $150.00 1 $150.00 1 $150.00 100.0% 200-26 3 EA $250.00 2 $500.00 1 $250.00 3 $750.00 100.0% 300-01 4 EA $2,000.00 4 $8,000.00 4 $8,000.00 100.0% 300-02 3 EA $500.00 3 $1,500.00 1 $500.00 4 $2,000.00 133.3% 300-03 40 LF $75.00 18 $1,350.00 18 $1,350.00 45.0% 300-04 4 EA $815.00 4 $3,260.00 4 $3,260.00 100.0% 300-05 44 EA $528.00 44 $23,232.00 44 $23,232.00 100.0% 300-06 44 LF $115.76 29 $3,357.04 11.5 $1,331.24 40.5 $4,688.28 92.0% 300-07 2 EA $3,000.00 4 $12,000.00 4 $12,000.00 200.0% 300-08 1 EA $3,734.00 1 $3,734.00 1 $3,734.00 100.0% 300-09 4 EA $7,500.00 4 $30,000.00 4 $30,000.00 100.0% 300-10 1 EA $2,000.00 2 $4,000.00 2 $4,000.00 200.0% 300-11 21 EA $200.00 4 $800.00 17 $3,400.00 21 $4,200.00 100.0% 300-12 192 SF $5.00 400-01 12 EA $1,000.00 12 $12,000.00 12 $12,000.00 100.0% Hydrant Extension Adjusting Water Valves Polystyrene Insulation Sanitary Sewer Manhole Covers Type J-Special Manholes 5-FT Diameter w/ Casting Inlets Median 1 Grate w/ Casting Adjusting Inlet Covers Connect to Existing Sump Pump Discharge Catch Basins 2.5x3-FT w/ Casting Storm Sewer Pipe PVC 4-Inch - Trenched Storm Sewer Pipe HDPE 4-Inch - Directionally Drilled Manholes 4-FT Diameter w/ Casting Storm Sewer Pipe Class III-A 12-Inch Storm Sewer Pipe Class III-A 15-Inch Storm Sewer Pipe HDPE 12-Inch Pipe Arch Corrugated Steel 24X18-Inch Storm Sewer Pipe Reinforced Concrete Class IV 12-Inch Storm Sewer Pipe Reinforced Concrete Class IV 15-Inch Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class HE-IV 14x23-Inch Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class HE-IV 19x30-Inch Abandoning Storm Sewer Apron Endwalls For Pipe Steel 12-Inch Connect to Existing Storm Sewer Lateral Apron Endwalls For Pipe Arch Steel 24X18-Inch Apron Endwalls For Culvert Pipe Reinforced Concrete 12-Inch Apron Endwalls For Culvert Pipe Reinforced Concrete Horizontal Elliptical 19x30-Inch Remove and Replace Water Service Curb Box Water Main PVC 6-Inch Water Gate Valve 6-Inch Water Gate Valve 8-Inch Hydrant Connect to Existing Storm Sewer Pipe Remove Hydrant Remove Gate Valve Remove Water Main Sawing Concrete Removing Small Pipe Culverts Removing Storm Sewer Structures Removing Storm Sewer Connect to Existing Water Main Fitting 00 62 76 - 3 10/12/26 Page 9 of 28 Unit Price Progress Estimate B C D E F G H I J Quantity Amount Quantity Amount Quantity Amount Quantity Amount % Comp.Bid No. Description Previous Applications This Application Materials Stored Total Completed & Stored to Date (C+E+G) Contractor's Application 5 9/1/26 - 9/30/26 October 13, 2026 Eagle Drive, Hawthorn Drive, Aspen Drive, Linden Drive A Item Estimated Bid Quantity Unit Price Quantity Completed Project: Application Period: Application Number: Application Date: 400-02 12 VF $436.00 12 $5,232.00 12 $5,232.00 100.0% 500-01 4218 LF $9.00 2800 $25,200.00 1400 $12,600.00 4200 $37,800.00 99.6% 500-02 1012 LF $15.00 500-03 4044 LF $1.10 500-04 3753 LF $2.00 500-05 15429 LF $2.75 500-06 23 EA $3,000.00 500-07 2 EA $3,000.00 500-08 1 EA $3,300.00 500-09 1 EA $2,500.00 1 $2,500.00 1 $2,500.00 100.0% 500-10 23 EA $900.00 9 $8,100.00 14 $12,600.00 23 $20,700.00 100.0% 500-11 3 EA $1,200.00 3 $3,600.00 3 $3,600.00 100.0% A1-01 2665 TON $16.50 A1-02 705 TON $66.80 A1-03 470 TON $71.00 A1-04 2080 LF $18.15 A2-01 1775 TON $16.50 1775 $29,287.50 1304.43 $21,523.10 3079.43 $50,810.60 173.5% A2-02 4010 SY $75.75 4010 $303,757.50 4010 $303,757.50 100.0% A2-03 2080 LF $18.65 2080 $38,792.00 2.5 $46.63 2082.5 $38,838.63 100.1% $2,200,655.30 $451,515.67 $2,652,170.96 Base Aggregate Dense 1 1/4-Inch Concrete Pavement 8-Inch Concrete Curb & Gutter 30-Inch Type A HMA Pavement 4 LT 58-28 H Concrete Curb & Gutter 30-Inch Type D Furnish and Install Lighting Unit Type A Furnish and Install Lighting Unit Type B - Single Furnish and Install Lighting Unit Type B - Twin Electrical Service Meter Breaker Pedestal Special Quazite Pull Boxes 12X12X24-Inch Electrical Wire Lighting 4 AWG Reconstructing Sanitary Sewer Manhole Concrete Base Type 5 Tall Base Aggregate Dense 1 1/4-Inch HMA Pavement 3 LT 58-28 S TOTAL Conduit Rigid Nonmetallic 2-Inch Conduit Special 2-Inch Electrical Wire Lighting 12 AWG Electrical Wire Lighting 6 AWG 00 62 76 - 4 10/12/26 Page 10 of 28 Taking the lead in Washington County STAFF MEMO Village of Jackson Public Works To: Brian Heckendorf, Village President Jen Heidtke, Village Administrator CC: Board of Public Works; Budget and Finance; Village Board From: Jack Straehler, Director of Public Works Subject: Reimbursement Request #17 - Final - 2024 Wastewater Treatment Plant Tertiary Filters and UV Disinfection Project - Clean Water Fund Loan in the amount of $6,424.24 Meeting Date: October 27, 2026 - Board of Public Works Background and Analysis: This memo is to inform the Board that, at its December 9, 2025, meeting, the Village Board approved and accepted the completed 2024 Wastewater Treatment Plant Tertiary Filter and UV Disinfection Project and authorized the Village Administrator to execute t he documents necessary to close out the Clean Water Fund loan. The attached Reimbursement Request number #17 - Final, in the amount of $6,424.24, is associated with the 2024 Tertiary Filter and UV Disinfection Project. This request covers the remaining engineering costs and construction management services related to final system optimization and project closeout. The work has been reviewed and verified for accuracy and completion in accordance with the project contract documents and schedule. Funding from this payment will reimburse Account Number: 300-00-17600-000-380 (Sewer Construction Work) If you have any questions, please let me know. JS Recommendation: Board of Public Works recommends the Budget and Finance Committee and Village Board approve the Clean Water Fund Loan Reimbursement Request #1 7 – Final in the amount of $6,424.24. Page 11 of 28 Page 12 of 28 Page 13 of 28 Page 14 of 28 Page 15 of 28 Taking the lead in Washington County STAFF MEMO Village of Jackson Public Works To: Brian Heckendorf, Village President Jen Heidtke, Village Administrator CC: Board of Public Works; Budget and Finance; Village Board From: Jack Straehler, Director of Public Works Subject: Authorization to Increase Sewer Utility Rates Effective January 1, 202 7 Meeting Date: October 27, 2026 – Board of Public Works Background and Analysis: This memo is to inform the Board of a proposed 18% Sewer Utility Rate increase, to take effect on January 1, 2027. During the Ehlers Financial Advisor’s presentation at the Village Board Meeting on October 13, 2026, the financial need for this rate adjustment was reviewed. The increase is necessary to prepare for the additional expenses anticipated with the forthcoming Wastewater Treatment Plant projects and upgrades. The need for a significant rate increase was first discussed during the 2024 budget workshops. At that time, the Board determined it would be more manageable to implement the required adjustments in smaller increments over multiple budget cycles rather than all at once. This proposed 18% increase represents the third consecutive year of implementing this planned adjustment. If you have any questions, please let me know. JS Recommendation: Board of Public Works recommends the Budget and Finance Committee and Village Board approve a resolution authorizing an 18% increase in Sewer Utility Rates effective January 1, 2027. Page 16 of 28 Resolution #26-33 1 RESOLUTION #26-33 AUTHORIZATION TO INCREASE SEWER UTILITY RATES The Village Board of the Village of Jackson, Washington County, Wisconsin, does resolve as follows: WHEREAS, the Village of Jackson is responsible to set fees for special services, penalties, and user fees established through policies and the Village Code; and, NOW, THEREFORE, BE IT RESOLVED that the Village Board of the Village of Jackson, Washington County, Wisconsin, does hereby establish Jackson Sewer Utility Rates for the Wastewater Treatment Facility with an 18% increase. The new rates are effective January 1, 2027, incorporated in the 2027 budget as follows: Sewer Rates & Charges: 5/8" Meter $84.71 3" Meter $423.60 3/4" Meter $84.71 4" Meter $488.76 1" Meter $117.25 6" Meter $710.68 1 1/4" Meter $162.63 8" Meter $988.55 1 1/2" Meter $202.01 10" Meter $1,367.14 2" Meter $260.66 Plus Volume Charge: $8.94 per 1,000 gal. Plus minimum charge. Unmetered Residential Sanitary Sewer / Debt Service $78.45 Unmetered Residential Sanitary Sewer / Volume Charge $169.72 Introduced by: Seconded by: Vote: Ayes Nays Passed and Approved: Brian J. Heckendorf – Village President Attest: Lisa Heiser - Village Clerk Page 17 of 28 Resolution #26-33 2 Proof of Posting: I the undersigned, certify that I posted this Resolution on posting boards at the Jackson Municipal Complex, Post Office, and one other location in the Village. Village Official Date Page 18 of 28 1 Resolution #26-34 RESOLUTION #26-34 FINAL RESOLUTION AUTHORIZING THE LEVY OF SPECIAL ASSESSMENTS AGAINST BENEFITED PROPERTY ASSOCIATED WITH THE 2026 EAGLE, HAWTHORN, ASPEN, AND LINDEN DRIVE RECONSTRUCTION PROJECT WHEREAS, the Village Board of the Village of Jackson, Washington County, Wisconsin, on the 21st day of April 2026, adopted a Preliminary Resolution declaring its intention to levy special assessments pursuant to Section 66.0703, Wisconsin Statutes upon the property benefited by the construction and reconstruction of public improvements consisting of water and sanitary sewer mains; storm sewers; pavement; curb and gutter; sidewalks; and street lighting. WHEREAS, the governing body held a public hearing at the Jackson Municipal Complex, located at N168W19851 Main Street at 7:30 p.m. on the 10th day of November 2026 for the purpose of hearing all interested persons who desired to speak concerning the project’s improvements and assessments, and WHEREAS, the governing body has examined Exhibit A and Exhibit B the report relating to the improvements and assessments (contained therein) and has considered the statements of those persons appearing at the public hearing, NOW, THEREFORE, BE IT RESOLVED, by the Village Board of the Village of Jackson, Washington County, Wisconsin, as follows: The report pertaining to the construction of the above-described public improvements, including plans and specifications, therefore, is adopted and approved. 1. The improvements were carried out in accordance with such report, and payment for assessing the cost to the property shall make the improvements, benefited those properties as indicated in the report. 2. The assessments shown on the report represent an exercise of police power, have been determined and completed on a reasonable basis, and are hereby confirmed. The total amount assessed is $123,638.83. The amount assessed against each of the affected properties is enumerated in the Assessment Report contained herein. 3. The assessments for all projects included in the report are hereby combined as a single assessment, but any interested property owner may object to each assessment separately or to all of the assessments jointly, for any purpose. 4. The property owners may, at their option, pay the assessment to the Treasurer of the Village of Jackson, in one single total payment, or have the amount added as a Special Assessment at 5% annual interest to their annual property tax statement(s) for a one-, three- or five-year term for amounts less than $5,000.00 and up to a ten- Page 19 of 28 2 Resolution #26-34 year term for amounts in excess of $5,000.00 starting on tax statement year 2026. 5. The Village Clerk shall publish this Resolution as a Class 1 notice, an Installment Assessment Notice, in accordance with Section 66.0703, Wisconsin Statutes. 6. The Village Treasurer shall mail to every interested person whose post office address is known or can with reasonable diligence be ascertained, including each property owner whose name appears on the property tax roll, a copy of this resolution, an invoice for the final assessment against the benefited property, and a contract agreement form in which the interested party shall elect their option of payment for such assessment, sign, and return to the Village Treasurer. Introduced by: Seconded by: Vote: ayes nays Passed and Approved: Brian J. Heckendorf – Village President Attest: Lisa Heiser – Village Clerk Proof of Posting: I the undersigned, certify that I posted this Resolution on bulletin boards at the Village Hall, Post Office, and one other location in the Village. Village Official Date Page 20 of 28 3 Resolution #26-34 Exhibit A - Preliminary Intent to Assess – Eagle Drive, Hawthorn Drive, Aspen Drive, and Linden Drive Page 21 of 28 4 Resolution #26-34 Exhibit B – Final Cost and Quantity - Eagle Drive, Hawthorn Drive, Aspen Drive, and Linden Drive GREEN = 4" Sidewalk ($ ORANGE = 6" Sidewalk ($8.20) Tax Parcel ID / Notes Name Address Assess. Width A (ft) Sidewalk Length A(ft) Sidewalk A(sqft) Price/sqft Assess. Width B(ft) Sidewalk Length B(ft) Sidewalk B(sqft) Price/sqft Sidewalk Total Length (ft) Sidewalk Total (sqft) Storm Lateral length(ft) Price/Foot Total Price/sqft for 4" Total Price/sqft for 6" Sidewalk Credit Total Price - Sidewalk Total price - Storm Total Assessed $ 196070 DAVID E FIEBIG, DIANE E FIEBIG N165W19944 HICKORY LN JACKSON, WI 53037 1 102.25 102.25 6.8 1 19.83 19.83 8.2 122.08 122.08 No Storm Lateral $24.70 $695.30 $162.61 $0.00 $857.91 $0.00 $857.91 196071 DUSTIN FORD W198N16533 LINDEN DR JACKSON, WI 53037 1 61 61 6.8 1 19.17 19.17 8.2 80.17 80.17 83.00 $24.70 $414.80 $157.19 $0.00 $571.99 $2,050.10 $2,622.09 196072 MICHAEL KUBCZAK & JILL KINGERY W198N16545 LINDEN DR JACKSON, WI 53037-0000 1 61.25 61.25 6.8 1 18.5 18.5 8.2 79.75 79.75 75.00 $24.70 $416.50 $151.70 $0.00 $568.20 $1,852.50 $2,420.70 196073 DARREL D WELDY, DONNA L WELDY W198N16557 LINDEN DR JACKSON, WI 53037 1 61.33 61.33 6.8 1 18.5 18.5 8.2 79.83 79.83 119.00 $24.70 $417.04 $151.70 $0.00 $568.74 $2,939.30 $3,508.04 196074 DANIEL R REIK, SARAH M REIK W198N16569 LINDEN DR JACKSON, WI 53037-0000 1 62.5 62.5 6.8 1 17.5 17.5 8.2 80.00 80.00 64.50 $24.70 $425.00 $143.50 $0.00 $568.50 $1,593.15 $2,161.65 196075 ROBERT J HEARLEY W198N16581 LINDEN DR JACKSON, WI 53037-0000 5 40.5 202.5 6.8 5 25.5 127.5 8.2 66.00 330.00 119.00 $24.70 $1,377.00 $1,045.50 -$700.00 $2,422.50 $2,939.30 $4,661.80 196075 ROBERT J HEARLEY W198N16581 LINDEN DR JACKSON, WI 53037-0000 1 20.75 20.75 6.8 1 0 0 8.2 20.75 20.75 0.00 $0.00 $141.10 $0.00 $0.00 $141.10 $0.00 $141.10 196040 JENNIFER FISHER W198N16518 LINDEN DR JACKSON, WI 53037 1 34.67 34.67 6.8 1 0 0 8.2 34.67 34.67 No Storm Lateral $24.70 $235.76 $0.00 $0.00 $235.76 $0.00 $235.76 196039 KURT E MACIEJCZAK, MARY B MACIEJCZAK W198N16528 LINDEN DR JACKSON, WI 53037 1 63 63 6.8 1 17 17 8.2 80.00 80.00 64.00 $24.70 $428.40 $139.40 $0.00 $567.80 $1,580.80 $2,148.60 196038 KELLY A MAAS W198N16538 LINDEN DR JACKSON, WI 53037 1 56 56 6.8 1 24 24 8.2 80.00 80.00 82.00 $24.70 $380.80 $196.80 $0.00 $577.60 $2,025.40 $2,603.00 196037 JOANNE LYNNE GONZALES W198N16548 LINDEN DR JACKSON, WI 53037 1 62.17 62.17 6.8 1 17.5 17.5 8.2 79.67 79.67 53.00 $24.70 $422.76 $143.50 $0.00 $566.26 $1,309.10 $1,875.36 196036 HAROLD F KEHRER REVOCABLE LIV TRUST, ANNETTE M SCHAMBURECK KEHRER REVOCABLE LIV TRUST W198N16558 LINDEN DR JACKSON, WI 53037 1 62.75 62.75 6.8 1 17.25 17.25 8.2 80.00 80.00 57.00 $24.70 $426.70 $141.45 $0.00 $568.15 $1,407.90 $1,976.05 196035 ROBERT G KREZMAN, MICHELLE M KREZMAN W198N16568 LINDEN DR JACKSON, WI 53037-0000 1 60.83 60.83 6.8 1 19 19 8.2 79.83 79.83 54.50 $24.70 $413.64 $155.80 $0.00 $569.44 $1,346.15 $1,915.59 196034 LEE A RICHARD, LINDA S RICHARD W198N16578 LINDEN DR JACKSON, WI 53037-0000 5 36.83 184.15 6.8 5 27.5 137.5 8.2 64.33 321.65 77.00 $24.70 $1,252.22 $1,127.50 -$700.00 $2,379.72 $1,901.90 $3,581.62 196034 LEE A RICHARD, LINDA S RICHARD W198N16578 LINDEN DR JACKSON, WI 53037-0000 1 15.75 15.75 6.8 1 0 0 8.2 15.75 15.75 0.00 $0.00 $107.10 $0.00 $0.00 $107.10 $0.00 $107.10 196027 RICHARD J DUQUAINE, DENISE M DUQUAINE W197N16511 ASPEN DR JACKSON, WI 53037-0000 1 130 130 6.8 1 24.17 24.17 8.2 154.17 154.17 No Storm Lateral $24.70 $884.00 $198.19 $0.00 $1,082.19 $0.00 $1,082.19 196028 NICOLE GUHL W197N16531 ASPEN DR JACKSON, WI 53037 1 60.83 60.83 6.8 1 19.5 19.5 8.2 80.33 80.33 127.00 $24.70 $413.64 $159.90 $0.00 $573.54 $3,136.90 $3,710.44 196029 ZACHARY R CLEMONS, KAYLA R CLEMONS W197N16551 ASPEN DR JACKSON, WI 53037 1 60.33 60.33 6.8 1 20 20 8.2 80.33 80.33 81.50 $24.70 $410.24 $164.00 $0.00 $574.24 $2,013.05 $2,587.29 196030 ALAN C FELDER, GENA M FELDER W197N16561 ASPEN DR JACKSON, WI 53037-0000 1 61.33 61.33 6.8 1 18.5 18.5 8.2 79.83 79.83 73.00 $24.70 $417.04 $151.70 $0.00 $568.74 $1,803.10 $2,371.84 196031 DALE L KAETTERHENRY REV TR, CAROL L KAETTERHENRY REV TR W197N16571 ASPEN DR JACKSON, WI 53027 1 56 56 6.8 1 24 24 8.2 80.00 80.00 86.60 $24.70 $380.80 $196.80 $0.00 $577.60 $2,139.02 $2,716.62 196032 CARRIE A FRAKES W197N16581 ASPEN DR JACKSON, WI 53037 1 62 62 6.8 1 18 18 8.2 80.00 80.00 115.00 $24.70 $421.60 $147.60 $0.00 $569.20 $2,840.50 $3,409.70 196033 ERIC J MOSGALLER W197N16591 ASPEN DR JACKSON, WI 53037-0000 5 48 240 6.8 5 19.83 99.15 8.2 67.83 339.15 89.50 $24.70 $1,632.00 $813.03 -$700.00 $2,445.03 $2,210.65 $3,955.68 196033 ERIC J MOSGALLER W197N16591 ASPEN DR JACKSON, WI 53037-0000 1 21.67 21.67 6.8 1 0 0 8.2 21.67 21.67 0.00 $0.00 $147.36 $0.00 $0.00 $147.36 $0.00 $147.36 196011 LEE R ZACHARYASZ, LISA B ZACHARYASZ W197N16508 ASPEN DR JACKSON, WI 53037-0000 1 71 71 6.8 1 18.5 18.5 8.2 89.50 89.50 No Storm Lateral $24.70 $482.80 $151.70 $0.00 $634.50 $0.00 $634.50 196012 MICHAEL J GARBERS, BRIANA N GARBERS W197N16518 ASPEN DR JACKSON, WI 53037 1 64.5 64.5 6.8 1 17.83 17.83 8.2 82.33 82.33 56.00 $24.70 $438.60 $146.21 $0.00 $584.81 $1,383.20 $1,968.01 196013 DOUGLAS A KEHRING, LINDA A KEHRING W197N16528 ASPEN DR JACKSON, WI 53037-0000 1 65.17 65.17 6.8 1 17.25 17.25 8.2 82.42 82.42 56.00 $24.70 $443.16 $141.45 $0.00 $584.61 $1,383.20 $1,967.81 196014 CHRISTOPHER H VESCHE, KRISTINE J VESCHE W197N16548 ASPEN DR JACKSON, WI 53037-0000 1 64.5 64.5 6.8 1 17 17 8.2 81.50 81.50 24.50 $24.70 $438.60 $139.40 $0.00 $578.00 $605.15 $1,183.15 196015 MICHAEL E KELLEY W197N16558 ASPEN DR JACKSON, WI 53037-0000 1 64.5 64.5 6.8 1 18 18 8.2 82.50 82.50 67.00 $24.70 $438.60 $147.60 $0.00 $586.20 $1,654.90 $2,241.10 196016 NICK HIDDE, HEATHER M SIEWERT W197N16568 ASPEN DR JACKSON, WI 53037 1 61.33 61.33 6.8 1 18.83 18.83 8.2 80.16 80.16 74.00 $24.70 $417.04 $154.41 $0.00 $571.45 $1,827.80 $2,399.25 196017 FORSHEE LIVING TRUST W197N16578 ASPEN DR JACKSON, WI 53037-0000 1 61.75 61.75 6.8 1 18 18 8.2 79.75 79.75 66.50 $24.70 $419.90 $147.60 $0.00 $567.50 $1,642.55 $2,210.05 196018 ALEXANDER H WEISHEIM, JANE C WEISHEIM W197N16588 ASPEN DR JACKSON, WI 53037-0000 5 39.83 199.15 6.8 5 28 140 8.2 67.83 339.15 54.00 $24.70 $1,354.22 $1,148.00 -$700.00 $2,502.22 $1,333.80 $3,136.02 196018 ALEXANDER H WEISHEIM, JANE C WEISHEIM W197N16588 ASPEN DR JACKSON, WI 53037-0000 1 12.75 12.75 6.8 1 0 0 8.2 12.75 12.75 0.00 $0.00 $86.70 $0.00 $0.00 $86.70 $0.00 $86.70 196026 NICHOLAS SCHRAM, ARIANA SCHRAM W196N16501 HAWTHORN DR JACKSON, WI 53037 1 122.5 122.5 6.8 1 23.75 23.75 8.2 146.25 146.25 44.00 $24.70 $833.00 $194.75 $0.00 $1,027.75 $1,086.80 $2,114.55 196025 JEFFREY L STEVENS, LANA P STEVENS W196N16521 HAWTHORN DR JACKSON, WI 53037-0000 1 65 65 6.8 1 18.67 18.67 8.2 83.67 83.67 84.50 $24.70 $442.00 $153.09 $0.00 $595.09 $2,087.15 $2,682.24 196024 MICHAEL D MARSHALL FAMILY TR, SARAH E MARSHALL FAMILY TR W196N16531 HAWTHORN DR JACKSON, WI 53037 1 61.83 61.83 6.8 1 22 22 8.2 83.83 83.83 98.00 $24.70 $420.44 $180.40 $0.00 $600.84 $2,420.60 $3,021.44 196023 JOEL T ROTGERS, LAURA M ROTGERS W196N16541 HAWTHORN DR JACKSON, WI 53037 1 64.5 64.5 6.8 1 18 18 8.2 82.50 82.50 80.50 $24.70 $438.60 $147.60 $0.00 $586.20 $1,988.35 $2,574.55 196022 JANET L THOMPSON W196N16561 HAWTHORN DR JACKSON, WI 53037 1 64.17 64.17 6.8 1 18.5 18.5 8.2 82.67 82.67 39.00 $24.70 $436.36 $151.70 $0.00 $588.06 $963.30 $1,551.36 196021 THOMAS D ANDERSON, MARY ANN T ANDERSON W196N16571 HAWTHORN DR JACKSON, WI 53037-0000 1 62.17 62.17 6.8 1 18 18 8.2 80.17 80.17 78.50 $24.70 $422.76 $147.60 $0.00 $570.36 $1,938.95 $2,509.31 196020 NATHAN DEERING, MARTINA DEERING W196N16581 HAWTHORN DR JACKSON, WI 53037 1 61.83 61.83 6.8 1 18 18 8.2 79.83 79.83 80.00 $24.70 $420.44 $147.60 $0.00 $568.04 $1,976.00 $2,544.04 196019 MARGARET A MILLER, MICHELLE A NORDLUND W196N16591 HAWTHORN DR JACKSON, WI 53037 5 50.17 250.85 6.8 5 19.25 96.25 8.2 69.42 347.10 98.00 $24.70 $1,705.78 $789.25 -$700.00 $2,495.03 $2,420.60 $4,215.63 196019 MARGARET A MILLER, MICHELLE A NORDLUND W196N16591 HAWTHORN DR JACKSON, WI 53037 1 10.67 10.67 6.8 1 0 0 8.2 10.67 10.67 0.00 $0.00 $72.56 $0.00 $0.00 $72.56 $0.00 $72.56 196002 TIMOTHY A P ARE W196N16500 HAWTHORN DR JACKSON, WI 53037 1 76.5 76.5 6.8 1 23.5 23.5 8.2 100.00 100.00 No Storm Lateral $24.70 $520.20 $192.70 $0.00 $712.90 $0.00 $712.90 196003 ROBERT P HELMINIAK, AMY M HELMINIAK W196N16520 HAWTHORN DR JACKSON, WI 53037-0000 1 61.5 61.5 6.8 1 18.5 18.5 8.2 80.00 80.00 57.50 $24.70 $418.20 $151.70 $0.00 $569.90 $1,420.25 $1,990.15 196004 MICHAEL W PUHL, SHERRI A PUHL W196N16530 HAWTHORN DR JACKSON, WI 53037 1 63.5 63.5 6.8 1 16.5 16.5 8.2 80.00 80.00 60.00 $24.70 $431.80 $135.30 $0.00 $567.10 $1,482.00 $2,049.10 196005 GREGORY S MANGAN, NANCY C MANGAN W196N16540 HAWTHORN DR JACKSON, WI 53037-0000 1 57 57 6.8 1 22.83 22.83 8.2 79.83 79.83 55.00 $24.70 $387.60 $187.21 $0.00 $574.81 $1,358.50 $1,933.31 196006 RICHARD KUPKA LIVING TRUST, GEORGIANA KUPKA LIVING TRUST W196N16550 HAWTHORN DR JACKSON, WI 53037-0000 1 52.5 52.5 6.8 1 22 22 8.2 74.50 74.50 55.50 $24.70 $357.00 $180.40 $0.00 $537.40 $1,370.85 $1,908.25 196007 JOHN F VOGT REVOCABLE TRUST W196N16560 HAWTHORN DR JACKSON, WI 53037 1 50.3 50.3 6.8 1 24 24 8.2 74.30 74.30 82.00 $24.70 $342.04 $196.80 $0.00 $538.84 $2,025.40 $2,564.24 196008 JOHN F BERINGER, MARSHA A BERINGER W196N16570 HAWTHORN DR JACKSON, WI 53037-0000 1 60.3 60.3 6.8 1 20 20 8.2 80.30 80.30 56.00 $24.70 $410.04 $164.00 $0.00 $574.04 $1,383.20 $1,957.24 196009 TIMOTHY VERKEN, NICOLE GIERACH VERKEN W196N16580 HAWTHORN DR JACKSON, WI 53037 1 63.25 63.25 6.8 1 17 17 8.2 80.25 80.25 58.50 $24.70 $430.10 $139.40 $0.00 $569.50 $1,444.95 $2,014.45 196010 ROBERT A POLIVKA, NANCY D POLIVKA W196N16590 HAWTHORN DR JACKSON, WI 53037-0000 5 52.5 262.5 6.8 5 20 100 8.2 72.50 362.50 65.50 $24.70 $1,785.00 $820.00 -$700.00 $2,605.00 $1,617.85 $3,522.85 196010 ROBERT A POLIVKA, NANCY D POLIVKA W196N16590 HAWTHORN DR JACKSON, WI 53037-0000 1 11.25 11.25 6.8 1 0 0 8.2 11.25 11.25 0.00 $0.00 $76.50 $0.00 $0.00 $76.50 $0.00 $76.50 019700S STEVEN G STILOSKI, JUDY BOEHM PO BOX 529 JACKSON, WI 53037 5 165 825 6.8 5 30 150 8.2 195.00 975.00 No Storm Lateral $24.70 $5,610.00 $1,230.00 $0.00 $6,840.00 $0.00 $6,840.00 019700R BUCK PROPERTIES LLC W194N16747 EAGLE DR STE N JACKSON, WI 53037-0000 5 127.17 635.85 6.8 5 0 0 8.2 127.17 635.85 No Storm Lateral $24.70 $4,323.78 $0.00 $0.00 $4,323.78 $0.00 $4,323.78 019700P001 CLAYPOOL PROPERTIES 3443 TAMARACK TRL WEST BEND, WI 53095-0000 5 131.5 657.5 6.8 5 33.3 166.5 8.2 164.80 824.00 No Storm Lateral $24.70 $4,471.00 $1,365.30 $0.00 $5,836.30 $0.00 $5,836.30 Assessed Total Linear Feet Assessed Total Square Feet Total Lateral Feet GRAND TOTAL $ 6108.18 1755.98 4,284.64 7,864.16 2911.10 $1,185.60 $41,535.62 $14,399.04 -$4,200.00 $55,934.66 $71,904.17 $123,638.83 2026 Final Assessment Spreadsheet - Eagle, Hawthorn, Aspen, and Linden Drive YELLOW = Partial Existing Sidewalk Page 22 of 28 1 Public Works Report October 27, 2026 Wastewater Treatment Plant - Designed Capacity – 1.69 million gallons per day Peak Flow Capacity – 6.0 million gallons per day Wastewater Treatment Plant Flows - Year 2024 Month Average Daily Flow Minimum Daily Flow Maximum Daily Flow January 1.337 MGD 0.980 MGD 2.260 MGD February 1.440 MGD 1.090 MGD 2.250 MGD March 1.502 MGD 0.950 MGD 2.590 MGD April 1.427 MGD 0.980 MGD 3.220 MGD May 1.325 MGD 0.980 MGD 1.990 MGD June 1.544 MGD 0.980 MGD 2.500 MGD July 1.146 MGD 0.850 MGD 1.560 MGD August 1.027 MGD 0.760 MGD 1.550 MGD September 0.884 MGD 0.700 MGD 1.400 MGD October 0.795 MGD 0.670 MGD 0.990 MGD November 0.997 MGD 0.720 MGD 1.610 MGD December 0.936 MGD 0.730 MGD 1.460 MGD Wastewater Treatment Plant Flows - Year 2025 Month Average Daily Flow Minimum Daily Flow Maximum Daily Flow January 0.881 MGD 0.750 MGD 1.160 MGD February 0.891 MGD 0.730 MGD 1.030 MGD March 1.356 MGD 0.840 MGD 2.300 MGD April 1.443 MGD 1.000 MGD 3.530 MGD May 1.279 MGD 0.830 MGD 2.530 MGD June 1.100 MGD 0.830 MGD 1.890 MGD July 0.993 MGD 0.860 MGD 1.280 MGD August 1.446 MGD 0.800 MGD 5.670 MGD September 0.953 MGD 0.820 MGD 1.210 MGD October 1.038 MGD 0.730 MGD 1.420 MGD November 0.929 MGD 0.760 MGD 1.080 MGD December 1.075 MGD 0.780 MGD 1.560 MGD Wastewater Treatment Plant Flows - Year 2026 Month Average Daily Flow Minimum Daily Flow Maximum Daily Flow January 1.203 MGD 0.830 MGD 1.700 MGD February 1.020 MGD 0.800 MGD 1.480 MGD March 1.532 MGD 0.970 MGD 2.250 MGD April 2.095 MGD 1.230 MPD 4.300 MGD May 1.038 MGD 0.830 MGD 1.260 MGD June 1.030 MGD 0.880 MGD 1.260 MGD July 1.080 MGD 0.830 MGD 1.490 MGD August 1.306 MGD 0.950 MGD 2.380 MGD September 1.342 MGD 1.020 MGD 2.400 MGD October November December Page 23 of 28 2 2024 Wastewater Treatment Plant – Holding & Septage Receiving Annually by Month Month Holdings Grease Grease Decant Septage Septage Decant Total Billed January 1,240,050 Gallons 500 Gallons 62,900 Gallons $14,003.00 February 1,236,550 Gallons 2,300 Gallons 63,100 Gallons $14,081.00 March 1,139,150 Gallons 4,500 Gallons 141,500 Gallons $15,200.25 April 1,135,752 Gallons 3,600 Gallons 225,950 Gallons $17,972.27 May 982,150 Gallons 14,800 Gallons 274,550 Gallons $17,573.25 June 734,178 Gallons 2,000 Gallons 175,950 Gallons $11,860.53 July 1,374,900 Gallons 11,300 Gallons 285,450 Gallons $21,563.25 August 1,362,350 Gallons 15,800 Gallons 272,200 Gallons $21,376.50 Septembe r 990,600 Gallons 1,000 Gallons 237,550 Gallons $15,904.75 October 1,044,550 Gallons 6,400 Gallons 228,3650 Gallons $16,545.75 November 987,500 Gallons 5,800 Gallons 195,350 Gallons $15,106.75 December 960,550 Gallons 2,750 Gallons 107,300 Gallons $12,453.00 2025 Wastewater Treatment Plant – Holding & Septage Receiving Annually by Month Month Holdings Grease Grease Decant Septage Septage Decant Total Billed January 1,008,400 Gallons 1,500 Gallons 40,650 Gallons $11,190.25 February 905,450 Gallons 1,400 Gallons 41,250 Gallons $10,169.75 March 1,237,500 Gallons 3,100 Gallons 72,450 Gallons $14,372.25 April 1,1317,75 0 Gallons 3,200 Gallons 168,650 Gallons $15,545.75 May 1,174,850 Gallons 17,900 Gallons 194,850 Gallons $17,693.75 June 1,084,900 Gallons 15,800 Gallons 223,750 Gallons $17,390.75 July 1,037,150 Gallons 15,000 Gallons 168,550 Gallons $15,485.25 August 1,184,950 Gallons 22,700 Gallons 187,850 Gallons $17,907.75 September 1,292,700 Gallons 800 Gallons 2,500 Gallons 268,400 Gallons $19,819.00 October 1,700,600 Gallons 4,500 Gallons 17,400 Gallons 479,250 Gallons $30,211.25 November 1,592,850 Gallons 8,200 Gallons 297,850 Gallons $23,866.75 December 1,908,200 Gallons 4,250 Gallons 128,650 Gallons $22,553.25 Page 24 of 28 3 2026 Wastewater Treatment Plant – Holding & Septage Receiving Annually by Month Month Holdings Grease Grease Decant Septage Septage Decant Total Billed January 1,455,600 Gallons 1,750 Gallons 75,700 Gallons $16,518.50 February 1,032,250 Gallons 2,000 Gallons 84,200 Gallons $12,547.50 March 1,239,500 Gallons 4,500 Gallons 89,950 Gallons $14,913.75 April 1,601,050 Gallons 13,900 Gallons 269,750 Gallons $23,588.25 May 1,066,950 Gallons 100 Gallons 13,750 Gallons 237,200 Gallons $17,428.50 June 1,102,400 Gallons 8,500 Gallons 6,000 Gallons 245,300 Gallons $17,921.50 July 1,069,000 Gallons 1,800 Gallons 16,000 Gallons 336,450 Gallons $20,133.25 August 936,900 Gallons 14,000 Gallons 221,500 Gallons $15,746.50 September 1,044,750 Gallons 6,000 Gallons 292,450 Gallons $18,118.75 October November December Wastewater Treatment Plant – Holding & Septage Receiving Annually Year Collected Amount Collected Year Collected Amount Collected Year Collected Amount Collected Year Collected Amount Collected 2005 $7,562.01 2006 $101,115.11 2007 $152,201.07 2008 $210,441.47 2009 $183,815.34 2010 $197,653.66 2011 $220,576.28 2012 $236,224.70 2013 $235,336.46 2014 $203,938.32 2015 $210,644.47 2016 $220,473.17 2017 $232,358.23 2018 $245,767.74 2019 $219,822.80 2020 $204,656.11 2021 $209,083.10 2022 $251,109.46 2023 $157,332.20 2024 $194,954.27 2025 $217,002.75 2026 Municipal Well Pump Information – Well Number and Pumping Capacity Well #1 400 GPM Well #3 900 GPM Well #4 1,200 GPM Well #5 1,100 GPM Well #6 800 GPM Summary of Municipal Water Consumption 2010 Total Annual Pumpage 239,326,000 Gallons 2011 Total Annual Pumpage 240,268,000 Gallons 2012 Total Annual Pumpage 253,492,000 Gallons 2013 Total Annual Pumpage 228,371,000 Gallons 2014 Total Annual Pumpage 230,973,000 Gallons 2015 Total Annual Pumpage 222,621,000 Gallons 2016 Total Annual Pumpage 254,531,000 Gallons 2017 Total Annual Pumpage 251,387,000 Gallons 2018 Total Annual Pumpage 241,322,000 Gallons 2019 Total Annual Pumpage 253,427,000 Gallons 2020 Total Annual Pumpage 259,413,000 Gallons 2021 Total Annual Pumpage 242,216,000 Gallons 2022 Total Annual Pumpage 222,033,000 Gallons 2023 Total Annual Pumpage 229,997,000 Gallons 2024 Total Annual Pumpage 233,155,000 Gallons 2025 Total Annual Pumpage 249,538,201 Gallons 2026 Total Annual Pumpage 123,123,123 gallons Page 25 of 28 4 Municipal Water Consumption - Year 2024 Month Average Daily Pumpage Highest Daily Pumpage Total Monthly Pumpage January 0.560 MGD 0.733 MGD 17.486 MG February 0.555 MGD 0.711 MGD 16.082 MG March 0.542 MGD 0.731 MGD 16.797 MG April 0.609 MGD 0.903 MGD 18.274 MG May 0.610 MGD 0.762 MGD 18.906 MG June 0.662 MGD 0.817 MGD 19.855 MG July 0.731 MGD 0.988 MGD 22.676 MG August 0.694 MGD 0.881 MGD 21.506 MG September 0.740 MGD 0.972 MGD 22.187 MG October 0.723 MGD 1.021 MGD 22.407 MG November 0.565 MGD 0.816 MGD 17.529 MG December 0.627 MGD 0.889 MGD 19.450 MG Municipal Water Consumption - Year 2025 Month Average Daily Pumpage Highest Daily Pumpage Total Monthly Pumpage January 0.680 MGD 0.781 MGD 18.847 MG February 0.683 MGD 0.820 MGD 19.115 MG March 0.694 MGD 0.769 MGD 21.201 MG April 0.707 MGD 1.122 MGD 21.212 MG May 0.716 MGD 0.917 MGD 22.210 MG June 0.842 MGD 1.000 MGD 25.265 MG July 0.856 MGD 1.066 MGD 26.550 MG August 0.785 MGD 0.970 MGD 24.209 MG September 0.838 MGD 1.269 MGD 25.126 MG October 0.814 MGD 1.196 MGD 25.219 MG November 0.702 MGD 0.912 MGD 21.069 MG December 0.668 MGD 0.842 MGD 20.695 MG Municipal Water Consumption - Year 2026 Month Average Daily Pumpage Highest Daily Pumpage Total Monthly Pumpage January 0.669 MGD 0.816 MGD 20.733 MG February 0.619 MGD 0.836 MGD 18.583 MG March 0.669 MGD 0.964 MGD 20.551 MG April 0.725 MGD 0.867 MGD 21.759 MG May 0.794 MGD 1.054 MGD 24.612 MG June 0.849 MGD 1.095 MGD 25.460 MG July 0.922 MGD 1.262 MGD 28.569 MG August 0.760 MGD 0.910 MGD 23.568 MG September 0.712 MGD 0.883 MGD 21.368 MG October November December Page 26 of 28 5 Midwest Fiber Network – Fiber to Homes There are no new updates currently. Installation of Midwest Fiber Network equipment continues throughout the Village, with work progressing steadily. Crews remain active in multiple areas, and significant progress has been made. Midwest Fiber Network – Upgrade to Village Facilities Following the June 9 Board meeting, the proposals were approved and forwarded to Midwest Fiber Network and Pros4 Technology. Pros4 Technology has been on-site and has installed the majority of the cameras and wiring needed at Jackson Park and Hickory Lane Park. Midwest Fiber Network has also been on-site to determine the fiber routing and installation points at each facility. Recently, updated plan sets, right-of-way permits, and official service and operational agreements were received and are currently under review. I anticipate Midwest Fiber Network will break ground this fall, with the project expected to be completed in the spring, weather permitting. Cedar Run Park – Dog Park Project Staff are putting the finishing touches on the dog park! The grass is growing well and is nearing the point where the gates may be unlocked by the end of the month to allow for public use, weather permitting. Staff are also completing the final details, including installing waste receptacles, picnic tables, and the park sign. We anticipate completing these items within the next 4–6 weeks, at which time an official soft opening will take place, also weather permitting. We look forward to seeing the park completed and welcoming community members and their four-legged friends to enjoy this new space. We’re excited to see how the community makes the park its own and what fun activities and events may take place in the future! WWTP Aeration Basin Upgrades / Service Building Upgrades There are no significant new updates at this time. The Aeration Basin Upgrades and the 2027 Service Building Upgrade Project are approximately 90% complete with the evaluation and design phases. Both projects remain on schedule and have been submitted to the Wisconsin Department of Natural Resources (DNR) for review. Additionally, The Village has applied for the 2027 Clean Water Fund Loan Program to help finance these improvements. The Wisconsin DNR will publish the final funding list in December 2026. 2026 Street Reconstruction Projects Construction is nearing completion, and all areas have been opened to the public. A few remaining punch- list items involving landscaping, mailboxes, and signage are being addressed. Streetlight poles were delayed during the ordering process and are anticipated to arrive on-site in December, with installation to follow. Restoration work associated with the light pole installation is scheduled for the spring. Temporary lighting has been installed in the interim until the permanent streetlighting system is complete. 2026 Streetlight Project Following approval by the Village Board in August, the project was awarded to MP Systems. A preconstruction meeting has been held, and the light poles and luminaires have been ordered, with delivery expected in December. Construction may begin this fall; however, the timing has not yet been confirmed. Depending on weather conditions, construction may need to be postponed until spring. Eagle Drive – North Segment Following approval from the Village Board, this project was completed in July by Stark Pavement Corporation. The line painting was completed by Washington County. This much-needed improvement has been well received by the public. Tower Drive – Water Tower Rehabilitation Project USG Water Works has successfully completed the rehabilitation project of the Tower Drive Water Tower. The project included a full sandblast and repainting of both the interior dry section and the interior wet section of the tower. Additionally, the exterior of the tower received minor spot repairs, followed by primer Page 27 of 28 6 application and complete exterior repainting. Safe water samples were collected and approved, allowing the tower to be returned to service and reconnected to the water distribution system as of July 18. Maple Fields Subdivision Phase 3 - No major updates at this time. All underground utility work, curb and gutter installation, binder course asphalt paving, and sidewalk construction have been completed. We Energies and Midwest Fiber Network have been on site performing underground utility work. Plans and permits have been received for nine new homes. Respectfully submitted, Jack Straehler, Director of Public Works Page 28 of 28

Source: Village of Jackson website. First collected Oct 27, 2026.