New Development Construction Packet
City of Oconto Falls · Oconto County · meeting of Oct 22, 2026 · Agenda packets
Open the original document More from City of Oconto Falls
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Below is the check list for the paperwork needed in order to obtain a building permit for any new
or remodeled stick-built dwelling.
These forms ** are included in the packet.
____ Act 211 Signature Form **
____ Completed Application **
Sign 1st and 3rd page
The highlighted form shows
information needed **
____ Cross Section ** if this info is
not on your plans
____ Building Plans
See Plan Info **
____ Plumbing Affidavit **
(For plumber)
____ Heat Calcs.
From HVAC contractor
____ Site Plan ** with Erosion. Control info documented.
Must show accurate property lines; all structures, decks, sheds, ingress & egress, etc., clearly
noted. All items must comply with City of Oconto Falls zoning regulations.
____ Recent survey of lot (copy)
If available
___ Contact Building Inspector for Fire number/Address (new builds)
____ Contact Oconto Falls Municipal Utilities for Water and Electric Connections
____Contact City Hall for Garbage and Recycling bins if need
Revised 02.02.26
Revised 02.02.26
_______List of all subcontractors: Names, Addresses, Phone and Email, and required State
Certification Numbers.
☐ Builder/General Contractor ☐ Excavator ☐ Mason ☐ HVAC Contractor
☐ Electrical Company ☐ Master Electricians ☐ Plumbing ☐ Demolition Contractor
O
nce the above required information is received, the application will be reviewed. Amount due
will be
provided to applicant, and permit will be issued
when payment is received.
If an early start permit is required for the foundation/slab, contact me for a separate application
and it
will be reviewed and processed accordingly.
A copy of INSPECTIONS REQUIRED
sheet is included for your information. Building Inspector does not need anyone on site, but easy
access is a requirement. A copy of my report will be secured on site. It is your responsibility to
call for the correct inspections.
Please have your licensed electrician call Building Inspector for the new service inspection once
he/she has set the meter base, ground rods and panel. Building Inspector will inspect and notify
Electric company with approval.
A state licensed electrician MUST install the SERVICE per the NEC and the State.
Contacts for City of Oconto Falls
J
ane Meissner, Building Inspector City Administrator Peter Wills/ City Hall
License #945930 500 N. Chestnut/ PO Box 70
715-245-1708 Oconto Falls WI. 54154
Nebuildinginspector@gmail.com Email. Pwills@cityofocontofalls.wi.gov
P hone 920-846-4505 ext 109
Fax 920-846-4516
O
conto Falls Municipal Utilities
Water and Electric Connections
500 N. Chestnut/ PO Box 70
Oconto Falls WI. 54154
Phone, 920-846-4507
Fax 920-846-4516
D
ate: _______________________________________________________
P
roject Name and Address: _______________________________________________________
T
his letter authorizes Jane E. Meissner, Nature's Edge Inspection Agency, Building Inspector for
The City of Oconto Falls to complete and submit to the State of Wisconsin, Department of Safety
and Professional Services, a building permit in accordance with Act 211.
Thank you.
S
ignature: _____________________________________________________________
Print Name: ___________________________________________________________
Date: ________________________________________________________________
INSPECTIONS
REQUIRED
FOR
NEW
DWELLINGS
AND
ADDITIONS
FOOTINGS/FOUNDATION
1. Whereforms, dampproofing, exteriorinsulationordraintilearerequiredforcodecompliance, thefooting/foundationshall beinspectedpriortobackfilling
ROUGHS
1. Aroughinspectionshall beperformedforthebasementfloorareaandtheunderfloorvaporretarderandplumbingif applicable. Roughinspectionof thegeneral constructionincluding: Framing, Roughelectrical, Roughplumbing,Roughheating, ventilatingandairconditioning.
INSULATION
1. Aninspectionshall bemadeof theinsulation andvaporretardersaftertheyareinstalledbut beforeconcealing.
FINAL/OCCUPANCY
1. Adwelling maynot beoccupieduntil afinal/occupancyinspectionhasbeenmadethat findsnocritical violationsof thecodethat couldreasonablybeexpectedtoaffect thehealthorsafetyof apersonusingthedwelling.
EROSION
CONTROL
Erosioncontrol inspections(if applicable) shall beperformedconcurrentlywithallotherrequiredconstructioninspections.
1
(5)REQUIREDPLANS. Therequiredbuildingplansshall belegibleanddrawntoscaleor dimensionedandshall includeall of thefollowing:(a) Siteplan. Thesiteplanshall showall of thefollowing:1. Thelocationof thedwellingandanyother buildings, wells,surfacewatersanddispersal systemsonthesitewithrespect topropertylinesandsurfacewatersadjacent tothesite.2. Theareasof land−disturbingconstructionactivityandthelocationof all erosionandsediment control measurestobeemployedinorder tocomplywiths. SPS321.125. Pleasedocument trackingareaondrive.3. Thepre−constructiongroundsurfaceslopeanddirectionof runoffflowwithintheproposedareasof landdisturbance.(b) Floorplan. 1. Floor plansshall beprovidedfor eachfloor.2. Thefollowingfeaturesshall beincludedonall floor plans:a. Thesizeandlocationof all rooms, doors, windows, structuralfeatures, exit passagewaysandstairs.b. Theuseof eachroom.c. Thelocationof plumbingfixtures, chimneys, heatingandcoolingappliances, andaheatingdistributionlayout. Alsothelocationof thefloor drainandelectrical panel.d. Thelocationandconstructiondetailsof wall bracingoneachbuildingsideandfloor level. Thedetailsmayconsist of theWall BracingComplianceWorksheet or alegendshowingwhichwall bracingmethodisusedandthelengthsor number of bracedwall panelsanddemarcationof thecircumscribedrectanglesifmorethanoneisused.(c) Elevations. Theelevationsshall showall of thefollowing:
1. Theexterior appearanceof thebuilding, includingthetypeof exterior materials.2. Thelocation, sizeandconfigurationof doors, windows,roof, chimneys, exterior grade, footingsandfoundationwalls.(6)REQUIREDDATA. (a) All planssubmittedfor approvalshallbeaccompaniedbysufficient data, calculationsandinformationtodetermineif thedwellingwill meet therequirementsof thiscode.(b) Thedataandinformationfor determiningcompliancewiththeenergyconservationstandardsshall besubmittedinaformatapprovedbythedepartment.(c) Except asrequiredunder s. SPS321.33, amunicipalityexercisingjurisdictionmaynot requireplansor calculationstobestampedor sealedbyanarchitect or engineer.(d) Thenameof theinitial downstreamreceivingwater of thestatefromthedwellingshall beidentified, regardingerosionandsediment control.determinesthat theplanssubmittedfor aone−or 2−familydwellingsubstantiallyconformtotheprovisionsof thiscodeandotherlegal requirements, anapproval shall beissued.
Plansmust beCONSTRUCTIONready, haveFOOTING/FOUNDATIONinformation, CUSTOMERSNAMEandbeONSITEat all times.
EXAMPLE SITE PLAN
City of Oconto Falls
500 N. Chestnut, Oconto Falls, WI. 54154
920-846-4505 – F: 920-846-4516
PROPERTY ADDRESS: _____________________________________________ RH #:__ __________________
OWNER NAME & ADDRESS: __________________________________________________________________
OWNER CONTACT #: ________________________ APPLICANT CONTACT #: _____________________
P
rovide 1 copy
of Site Plan
S
how on Plan
Lot lines
Lot Dimensions
Street(s) Name
All existing Structures
Driveway location
Special Easements (provide
deed information)
Power Supply
Location of New Structure
Structure Distance to Lot Lines
Distance to Other Buildings
Property Address
Owner Name & Address
Note: If Site Plan is not complete, the
review process will be delayed.
Shed
Deck
Garage
Existing House
SITE PLAN
Pr
operty Owner contract Phone Number_______________________
Property Owner Email_____________________________
Contractors Phone Number________________Contractors Email_________________________
Dept of Safety & Professional Services
Industry Services Division
Wisconsin Uniform Building
Permit Application
Application No.
Wisconsin Stats. 101.63, 101.73 Instructions on back of second ply. The information you provide may be
used by other government agency programs [(Privacy Law, s. 15.04 (1)(m)]
Parcel No.
PERMIT REQUESTED Constr. HVAC Electric Plumbing Erosion Control Other:
Owner’s Name Mailing Address Email: Tel.
Contractor Name & Type Lic/Cert# Exp Date Mailing Address Tel. & Email
Dwelling Contractor (Constr.)
Dwelling Contr. Qualifier The Dwelling Contr. Qualifier shall be an owner,
CEO, COB or employee of the Dwelling Contr.
HVAC
Electrical Contractor
Electrical Master Electrician
Plumbing
PROJECT
LOCATION
Lot area
Sq.ft.
One acre or more of
soil will be disturbed
Town Village
City of 1/4, 1/4, of Section , T N, R E/W
Building Address County Subdivision Name Lot No. Block No.
Zoning District(s) Zoning Permit No. Setbacks: Front
ft.
Rear
ft.
Left
ft.
Right
ft.
1. PROJECT New Alteration Addition Repair Raze Move Other
2. AREA INVOLVED (sq ft) Unit 1 Unit 2 Total
Unfin. Bsmt.
Living Area
Garage
Deck/Porch
Totals
3. OCCUPANCY Single Family Two Family Garage Other 4. USE Seasonal Permanent Other:
5. CONSTRUCTION TYPE Site Built Mfd. Per WI UDC Mfd. Per US HUD
6. STORIES 1-Story 2-Story Other: Plus Basement 7. EST. BUILDING COST w/o LAND $
8. WALLS Wood Frame Steel ICF Timber/Pole Other 9. ELECTRIC Panel Amps: Underground Overhead
10. SEWER Municipal Sanitary Permit # 11. WATER Municipal On-Site Well
I understand that I: am subject to all applicable codes, laws, statutes and ordinances, including those described on the reverse side of the last ply of this form; am subject to
any conditions of this permit; understand that the issuance of this permit creates no legal liability, express or implied, on the state or municipality; and certify that all the
above information is accurate. If one acre or more of soil will be disturbed, I understand that this project is subject to ch. NR 151 regarding additional erosion control and
stormwater management and the owner shall sign the statement on the back of the permit if not signing below. I expressly grant the building inspector, or the inspector's
authorized agent, permission to enter the premises for which this permit is sought at all reasonable hours and for any proper purpose to inspect the work which is being done.
I vouch that I am or will be an owner-occupant of this dwelling for which I am applying for an erosion control or construction permit without a
Dwelling Contractor Certification and have read the cautionary statement regarding contractor responsibility on the reverse side of the last ply of this
form.
APPLICANT (Print:) ____________________________________ Sign:___________________________________________ DATE
APPROVAL CONDITIONS This permit is issued pursuant to the following conditions. Failure to comply may result in suspension
or revocation of this permit or other penalty. See attached for conditions of approval.
ISSUING
JURISDICTION
Town of County of
Village of State
City of
State-Contracted
Inspection Agency#:
Municipality Number of Dwelling Location
-
FEES: PERMIT(S) ISSUED WIS PERMIT SEAL # PERMIT ISSUED BY:
Plan Review
Inspection
Wis. Permit Seal
Other
Total
$
$
$
$
$
Construction
HVAC
Electrical
Plumbing
Erosion Control
__________________
Name ___________________________________________
Date _______________ Tel. ________________________
Cert No. _________________________________________
Email: ___________________________________________
SBD-5823(R1/17) Distribute: Ply 1 – Issuing Jurisdiction; Ply 2- Issuer forwards to state w/in 30 days; Ply 3- Inspector; Ply 4- Applicant
INSTRUCTIONS
The owner, builder or agents shall complete the application form down through the Signature of Applicant block and submit it and
building plans and specifications to the enforcing jurisdiction, which is usually your municipality or county. Permit application
data is used for statewide statistical gathering on new one- and two-family dwellings, as well as for local code administration.
Please type or use ink and press firmly with multi-ply form.
PERMIT REQUESTED
Check off type of Permit Requested, such as structural, HVAC, Electrical or Plumbing.
Fill in owner's current Mailing Address and Telephone Number.
If the project will disturb one acre or more of soil, the project is subject to the additional erosion control and stormwater
provisions of ch. NR 151 of the WI Administrative Code. Checking this box will satisfy the related notification requirements
of ch. NR 216.
Fill in Contractor and Contractor Qualifier Information. Per s. 101.654 (1) WI Stats., an individual taking out an erosion
control or construction permit shall enter his or her dwelling contractor certificate number, and name and certificate number
of the dwelling contractor qualifier employed by the contactor, unless they reside or will reside in the dwelling. Per s. 101.63
(7) Wis. Stats., the master plumber name and license number must be entered before issuing a plumbing permit.
PROJECT LOCATION
Fill in Building Address (number and street or sufficient information so that the building inspector can locate the site.
Local zoning, land use and flood plain requirements must be satisfied before a building permit can be issued. County
approval may be necessary.
Fill in Zoning District, lot area and required building setbacks.
1. PROJECT DATA - Fill in all numbered project data blocks (1-11) with the required information. All data blocks must be filled
in, including the following:
2. AREA (involved in project):
Basements - include unfinished area only
Living area - include any finished area including finished areas in basements
Two-family dwellings - include separate and total combined areas
3. OCCUPANCY - Check only "Single-Family" or "Two-Family" if that is what is being worked on. In other words, do not
check either of these two blocks if only a new detached garage is being built, even if it serves a one or two family dwelling .
Instead, check "Garage" and number of stalls. If the project is a community based residential facility serving 3 to 8 residents,
it is considered a single-family dwelling.
4. USE - Seasonal, permanent or other.
7. ESTIMATED BLDG COST - Include the total cost of construction, including materials and market rate labor, but not the cost
of land or landscaping.
10. SEWER - A building permit cannot be issued until a sanitary permit has been issued for any new or affected existing private
onsite wastewater treatment system.
SIGNATURE – The owner or the contractor’s authorized agent shall sign and date this application form. If you do not possess the
Dwelling Contractor certification, then you will need to check the owner-occupancy statement for any erosion control or
construction permits.
CONDITIONS OF APPROVAL - The authority having jurisdiction uses this section to state any conditions that must be complied
with pursuant to issuing the building permit.
ISSUING JURISDICTION: This must be completed by the authority having jurisdiction.
Check off Jurisdiction Status, such as town, village, city, county or state and fill in Municipality Name
Fill in State Inspection Agency number only if working under state inspection jurisdiction.
Fill in Municipality Number of Dwelling Location
Check off type of Permit Issued, such as construction, HVAC, electrical or plumbing.
Fill in Wisconsin Uniform Permit Seal Number, if project is a new one- or two-family dwelling.
Fill in Name and Inspector Certification Number of person reviewing building plans and date building permit issued.
Cautionary Statement to Owners Obtaining Building Permits
101.65(lr) of the Wisconsin Statutes requires municipalities that enforce the Uniform Dwelling Code to
provide an owner who applies for a building permit with a statement advising the owner that:
If the owner hires a contractor to perform work under the building permit and the contractor is not bonded
or insured as required under s. 101.654 (2) (a), the following consequences might occur:
(a) The owner may be held liable for any bodily in jury to or death of others or for any damage to
the property of others that arises out of the work performed under the building permit or that is caused by
any negligence by
the contractor that occurs in connection with the work performed under the building
permit.
(b) The owner may not be able to collect from the contractor damages for any loss sustained by
the owner because of a violation by the contractor of the one- and two- family dwelling code or an
ordinance enacted under sub. (1) (a), because of any bodily injury to or death of others or damage to the
property of others that arises out of the work performed under the building permit or because of any
bodily injury to or death of others or damage to the property of others that is caused by any negligence by
the contractor that occurs in connection with the work performed under the building permit.
Cautionary Statement to Contractors for Projects Involving Building Built Before 1978
If this project is in a dwelling or child-occupied facility, built before 1978, and disturbs 6 sq. ft. or more
of paint per room, 20 sq. ft. or more of exterior paint, or involves windows, then the requirements of ch.
DHS 163 requiring Lead-Safe Renovation Training and Certification apply. Call (608)261-6876 or go to
the Wisconsin Department of Health Services’ lead homepage for details of how to be in compliance
Wetlands Notice to Permit Applicants
You are responsible for complying with state and federal laws concerning the construction near or on
wetlands, lakes, and streams. Wetlands that are not associated with open water can be difficult to
identify. Failure to comply may result in removal or modification of construction that violates the law or
other penalties or costs. For more information,
visit the Department of Natural Resources wetlands
identification web page or contact a Department of Natural Resources service center.
Additional Responsibilities for Owners of Projects Disturbing One or More Acre of Soil
I understand that this project is subject to ch. NR 151 regarding additional erosion control and stormwater
management
and will comply with those standards.
Owner's Signature: _______________________________________ Date:___________________
Contractor Credential Requirements
All contractors shall possess an appropriate contractor credential issued by the Wisconsin Division of
Industry Services.
SBD-10605(R1/20)
Wisconsin Department of Safety and Professional Services
Division of Industry Services
4822 Madison Yards Way
PO Box 7302
Madison WI 53707-7302
Affidavit of Plumbing Testing
With the inspector’s permission, per SPS 382.21(1)(b)1b, complete entire form. Use of this form is not
mandatory. This is a suggested format that a plumber may replace with their own affidavit. Print or type
clearly. Call for your rough inspection and inform the inspector that you have completed the testing and the
affidavit. Provide this completed form to the inspector prior to or at the time of the rough-in inspection.
Date of test: Responsible Master:
Responsible MP Number:
Personal information you provide may be used for secondary purposes [Privacy Law, s. 15.04 (1)(m)].
Owner and Site Information
Owner’s Name:
Project Site Address:
Project Site City:
Type of project (check one):
New plumbing installation Remodel or addition Repair Other
If other, explain:
Testing Information
Sanitary Building Sewer or Private
Interceptor Main Sewer
Water test (10’ for 15 minutes)
Air test (3 psig for 15 minutes)
(air test not recommended for plastic pipe)
Water Service or Private Water Main
Water test (Working pressure)
Air test (Working pressure)
Building Drain
Water test (10’ except for top 10’ for 15 minutes)
Air test (5 psig for 15 minutes)
Drain & Vent System
Water test (10’ for 15 minutes)
Air test (5 psig for 15 minutes)
Water Distribution
Water test (Working pressure)
Air test (Working pressure)
Air Admittance Valves Manometer test to 1” water column
Responsible Master Plumber - signature Witness (not required) - signature
Phone: 608-266-2112
Web: http://dsps.wi.gov
Email: dsps@wisconsin.gov
Vapor Retarder Drain Tile SystemFooting
Concrete Floor
Vertical ReinforcementFoundation Wall
1/2" Anchor Bolts
Treated Sill PlateClear span, to support
Insulation
Floor Joist
Horizontal Reinforcement
Footing Reinforcement
Roof:Pitch-__________/12Shingles-_________________________________Felt-______________lb.Ice Barrier-_____________________Roof Sheathing-________________________Truss-______Yes______No (if yesif no answer the followingRafter Size-__________x_________Rafter Spacing-__________"-O.C.Rafter Clear Span-________________________________Rafter Species & Grade-_____________/______________Ridge Type & Size-_________________/______________Ceiling Joist Size-_________________________________Ceiling Joist Spacing-______________________________Ceiling Joist Species & Grade-_____________/________Insulation Type & R- Value-________________/R______Roof Ventilation-______________________________
Building Cross SectionRafterorTruss
Ceiling joist
ShinglesFeltIce BarrierRoof Sheathing
Headers
SidingSheathing
Insulation
Wall Framing
Interior FinishVapor Retarder
Foundation:Anchor Type___________________________Anchor Spacing________________________Sill Plate-_____________________________Insulation Type / R-Value-__________R-____ Wall Height-___________________________Poured Wall Size-_______________________Block Wall Size-________________________Vertical Reinforcement- #_____-_______o.c.Horizontal Reinforcement- #_____-_____o.c.Concrete Floor Thickness-______________Vapor Retarder-________________________Drain Tile Size-________________________Column Pad Size-______x______x_______Column Spacing-______________________Footing Width-_________________________Footing Heigth-________________________Footing Depth Below Grade-___________Footing Reinforcement- #_____-______o.c.
Floor:Sub-Floor___________________________Floor Joist Type______________________Floor Joist Size_______________________Floor Joist Spacing-____________________Floor Joist Clear Span-_________________Floor Joist Species-____________________Floor Joist Grade-_____________________Beam Support, Type & Size-________/____Distance From Grade-__________________
Walls:Siding-___________________________Sheathing Type & Thickness-____________/_____"Insulation Type / R-Value-______________R-____ Header Size-__________x___________Ceiling Height-________________________Stud Size & Spacing-______x_______/_____"O.C.Interior Finish-___________________________Grade of Framing Lumber -_________________Name_______________________________ Job Address______________________________________________________________________________________________________________________________________Contact Phone #____________________________________
Revised 3-1-07 jaw
truss clips must be installed if span is over 6')
Gravel Fill
Standard Erosion Control Plan
for 1- & 2-Family Dwelling Construction Sites
According to Chapters SPS 320 & 321 of the Wisconsin Uniform Dwelling Code, soil erosion control
information needs to be included on the plot plan which is submitted and approved prior to the issuance of
building permits for 1- & 2-family dwelling units in those jurisdictions where the soil erosion control
provisions of the Uniform Dwelling Code are enforced. This Standard Erosion Control Plan is provided to
assist in meeting this requirement.
Instructions:
1. Complete this plan by filling in requested information, completing the site diagram and marking
appropriate boxes on the inside of this form.
2. In completing the site diagram, give consideration to potential erosion that may occur before, during, and
after grading. Water runoff patterns can change significantly as a site is reshaped.
3. Submit this plan at the time of building permit application.
PROJECT LOCATION __________________________________________________________
BUILDER ______________________________ OWNER ______________________________
WORKSHEET COMPLETED BY _____________________ DATE _______________________
1
PROPERTY
LINE
EXISTING
DRAINAGE
TEMPORARY
DIVERSIONTD
FINISHED
DRAINAGE
LIMITS OF
GRADING
SILT
FENCE
STRAW
BALES
GRAVEL
VEGETATION
SPECIFICATION
TREE
PRESERVATION
STOCKPILED
SOIL
EROSION
CONTROL PLAN
LEGEND
Please indicate north
by completing the arrow.
NSITE DIAGRAM Scale: 1 inch = ____feet
EROSION CONTROL PLAN CHECKLIST
Check (✔) appropriate boxes below, and complete the site diagram
with necessary information.
Site Characteristics
❒ North arrow, scale, and site boundary. Indicate and name adjacent streets or roadways.
❒❒ Location of existing drainageways, streams, rivers, lakes, wetlands or wells.
❒ Location of storm sewer inlets.
❒ Location of existing and proposed buildings and paved areas.
❒ The disturbed area on the lot.
❒ Approximate gradient and direction of slopes before grading operations.
❒ Approximate gradient and direction of slopes after grading operations.
❒❒ Overland runoff (sheet flow) coming onto the site from adjacent areas.
Erosion Control Practices
❒❒ Location of temporary soil storage piles.
Note: Soil storage piles should be placed behind a sediment fence, a 10 foot wide
vegetative strip, or should be covered with a tarp or more than 25 feet from
any downslope road or drainageway.
❒ Location of access drive(s).
Note: Access drive should have 2 to 3 inch aggregate stone laid at least 7 feet wide
and 6 inches thick. Drives should extend from the roadway 50 feet or to the
house foundation (whichever is less).
❒❒ Location of sediment controls (filter fabric fence, straw bale fence or 10-foot-wide
vegetative strip) that will prevent eroded soil from leaving the site.
❒❒ Location of sediment barriers around on-site storm sewer inlets.
❒❒ Location of diversions.
Note: Although not specifically required by code, it is recommended that concen-
trated flow (drainageways) be diverted (re-directed) around disturbed areas.
Overland runoff (sheet flow)from adjacent areas greater than 10,000 sq. ft.
should also be diverted around disturbed areas.
❒❒ Location of practices that will be applied to control erosion on steep slopes (greater than
12% grade).
Note: Such practices include maintaining existing vegetation, placement of additional
sediment fences, diversions, and re-vegetation by sodding or seeding with use
of erosion control mats.
❒❒ Location of practices that will control erosion on areas of concentrated runoff flow.
Note: Unstabilized drainageways, ditches, diversions, and inlets should be protected
from erosion through use of such practices as in-channel fabric or straw bale
barriers, erosion control mats, staked sod, and rock rip-rap. When used, a
given in-channel barrier should not receive drainage from more than two acres
of unpaved area, or one acre of paved area. In-channel practices should not be
installed in perennial streams (streams with year round flow).
❒❒ Location of other planned practices not already noted.
COMPLETED
NOT APPLICABLE
COMPLETED
NOT APPLICABLE
Indicate management strategy by checking (✔) the appropriate box.
Management Strategies
❒❒ Temporary stabilization of disturbed areas.
Note: It is recommended that disturbed areas and soil piles left inactive for extended
periods of time be stabilized by seeding (between April 1 and September 15), or
by other cover, such as tarping or mulching.
❒ Permanent stabilization of site by re-vegetation or other means as soon as possible
(lawn establishment).
• Indicate re-vegetation method: ❒Seed ❒Sod ❒Other ___________
• Expected date of permanent re-vegetation: _________________________
• Re-vegetation responsibility of: ❒Builder ❒Owner/Buyer
• Is temporary seeding or mulching planned if site is not seeded by
Sept. 15 or sodded by Nov. 15?
❒Yes ❒No
❒❒ Use of downspout and/or sump pump outlet extensions.
Note: It is rec ommended that flow from downspouts and sump pump outlets be routed
through plastic drainage pipe to stable areas such as established sod or pavement.
❒❒ Trapping sediment during de-watering operations.
Note: Sediment-laden discharge water from pumping operations should be ponded
behind a sediment barrier until most of the sediment settles out.
❒ Proper disposal of building material waste so that pollutants and debris are not carried
off-site by wind or water
.
❒ Maintenance of erosion control practices.
• Sediment will be removed from behind sediment fences and barriers
before it reaches a depth that is equal to half the height o f the barrier.
• Breaks and gaps in sediment fences and barriers will be repaired imme-
diately. Decomposing straw bales will be replaced (typical bale life is
three months).
• All sediment that moves off-site due to construction activity will be
cleaned up before the end of the same workday.
• All sediment that moves off-site due to storm events will be cleaned up
before the end of the next workday.
• Access drives will be maintained throughout construction.
• All installed erosion control practices will be maintained until the
disturbed areas they protect are stabilized.
Printed on
recycled paper
This publication is available from county UW-Extension offices or from Extension Publications, 45 N. Charter
St., Madison, WI 53715. (608) 262-3346 or toll-free (877) 947-7827. A publication of the University of
Wisconsin–Extension in cooperation with the Wisconsin Department of Natural Resources and the Wisconsin
Department of Commerce.GWQ001A Standard Erosion Control Plan for 1 & 2 Family Dwelling Construction Sites
DNR WT-458-96 R-03-02-2M-10-S
CONTROLS REQUIRED
• Erosion control measures specified in the Wisconsin
Construction Site Best Management Practice Handbook.
• Measures to control storm water after construction.
Check with your county, city, village, or town for any local erosion control ordinances including shoreland zoning require-
ments. Except for new 1- & 2-family dwellings, local ordinances may be more strict than state regulations. They may also
require erosion control on construction projects not affected by state or federal regulations.
EROSION CONTROL REGULATIONS
FOR MORE INFORMATION, CONTACT
• Department of Natural Resources, Storm Water Permits,
NOI Permit (Notice of Intent) P.O. 7921, Madison, WI
53707-7921,
CONTROLS REQUIRED
• Silt fences, straw bales, or other approved perimeter
measures along downslope sides and side slopes.
• Access drive.
• Straw bales, filter fabric fences or other barriers to
protect on-site sewer inlets.
• Additional controls if needed for steep slopes or other
special conditions.
FOR MORE INFORMATION, CONTACT:
• Local building inspector
• Department of Safety and & Professional Services,
P
.O. Box 7970, Madison, Wis. 53707-7970
LOCAL ORDINANCES
UNIFORM DWELLING CODE (DEPT. OF SAFTEY & PROF SERVICES)
STORMWATER PERMIT (DEPT. OF NATURAL RESOURCES)
Editing and design by the Environmental Resources Center, University of Wisconsin–Extension.
Erosion control and stormwater regulations can be complex. Local, state and, in
some cases, federal regulations may apply. Before construction make sure you have
the appropriate permits.
©1999 by the Board of Regents of the University of Wisconsin System. Send inquiries about copyright permission to: Cooperative Extension
Publications, 432 North Lake Street, Madison, WI 53706. University of Wisconsin-Extension is an EEO/Affirmative Action employer and provides
equal opportunities in employment and programming, including Title IX and ADA requirements.
For more assistance on plan preparation, refer to the Wisconsin Uniform Dwelling Code, the DNR Wisconsin Construction Site
Best Management Handbook, and UW–Extension publication Erosion Control for Home Builders. The Wisconsin Uniform Dwelling
Code and the Wisconsin Construction Site Best Management Handbook are available through the State of Wisconsin Document
Sales, (608) 266-3358.
Erosion Control for Home Builders (GWQ001) can be ordered through Extension Publications, (608) 262-3346 or the Department
of Commerce, (608) 267-4405. A PDF version of Erosion Control for Home Builders (GWQ001) and Standard Erosion Control Plan
are also available at http://clean-water.uwex.edu/pubs/sheets
RIGHT-OF-WAY
EXCAVATION PERMIT
500 N. Chestnut Ave
Oconto Falls, WI 54154
Applicant
Name:
Address:
City: State: ZIP Code:
Phone #: Cell: Email:
Contractor
Name:
Address:
City: State: ZIP Code:
Phone #: Cell: Email:
Description of Work
Address or Location Description:
Applicant shall place a flag or marker in the ROW at the location of the proposed work to allow the City to evaluate the permit
Brief Description of Work:
Plans Prepared by: Construction plans specifying proposed backfill material
must be included with application
Proposed Utility Orientation Proposed Method of Installation
☐ Cross right of way
☐ Parallel right of way
☐ Underground
☐ Overhead
☐ Open cut ☐ Trench ☐ Tunnel
☐ Jack & bore ☐ Plow ☐ Cased
☐ Suspended on poles ☐ Other:
Estimated Start date: Estimated Restoration date:
• The applicant/contractor understands and agrees that the permitted work shall comply with all permit provisions and
conditions listed on the reverse side hereof, any special provisions listed below or attached hereto, and any and all
plans, details or notes attached hereto and made a part hereof.
• Applicant and contractor will indemnify and hold harmless the City of Oconto Falls and its various departments,
commissions, employees, and agents from all liability for accidents and damage caused by any of the work in
connection with this permit and applicant/contractor will fill and place in good and safe condition all excavations
and openings made in any public street, alley, sidewalk, ditch, City or municipal utility easement, or other public
right-of-way.
Signature of Applicant, Agent, or Contractor Date
PERMIT APPROVAL & CONDITIONS
• The foregoing application is hereby approved and permit issued by the City of Oconto Falls subject to full
compliance by the applicant/contractor with all provisions and conditions stated herein and on the reverse side
hereof and all attachments hereto.
• OTHER SPECIAL PROVISIONS/CONDITIONS OF APPROVAL:
City Signatory: Title:
Approval Date:
Payment Information
Permit Fee (non-refundable) $ Paid By:
Total Paid $ Receipt #
PERMIT PROVISIONS AND CONDITIONS OF ISSUANCE
This permit is granted to allow performance of the specific work described herein. The following standard provisions
and any included special provisions shall govern.
• The Permit Fee shall be as follows:
o ROW abutting only single residence: $75.00
o Up to 500’ of ROW: $250.00
o Over 500’ of ROW: $250.00 per 500’
1. Proof of insurance from all companies working with in the City limits.
2. This permit shall be valid for a period of 30 days from the date of issuance. Requests for renewals shall be
made in writing pursuant to Section 233-3.F of the City of Oconto Falls Code of Ordinances.
3. No excavation shall be permitted between November 15 and April 15 unless a determination has been made in
writing by the City Administrator – Clerk/Treasurer, Utility Manager, or their designee, that there exists a
situation requiring an emergency excavation.
4. All nonemergency excavations shall be accomplished during business hours, M -F. No nonemergency
excavation shall be started on a Friday, the day before a municipal holiday, or after 2:00 p.m. on any day. No
excavation may begin until the permittee has received approval to proceed from the City Administrator –
Clerk/Treasurer or designee and has arranged for a City representative to be present during the excavation. The
permittee shall call City Hall (920-846-4505) no less than one full business day prior to the desired start date to
seek approval to proceed and arrange for the presence of a City representative.
5. The permittee shall call Diggers’ Hotline a minimum of three days prior to undertaking any excavation. The
permittee shall be responsible for protecting all private and public utility infrastructure (including, without
limitation, private sewer and water laterals) from damage in connection with the permitted work.
6. The permittee shall comply with all applicable local, state, and federal statutes, rules, regulations, and ordinances,
including without limitation, Chapter 233 of the City of Oconto Falls Code of Ordinances. Obtaining a right-of-
way excavation permit does not relieve the permittee from the obligation to obtain any other permit, license, or
approval required for the work undertaken.
7. The permittee shall provide sufficient warning signs, devices, and barriers to protect the public in accordance
with the latest edition of the Wisconsin Manual of Uniform Traffic Control. The permittee shall not obstruct
the traveled portion of the right -of-way unless permission is first obtained from the Administrator –
Clerk/Treasurer or designee. Except by special permission in writing from the Administrator – Clerk/Treasurer
or designee, no more than 500 feet of trench shall be open at a time.
8. Upon completion, the permittee shall restore all disturbed areas to their prior condition or better, to the
satisfaction of the Administrator – Clerk/Treasurer or designee, and in compliance with Section 233-11 of the
City of Oconto Falls Code of Ordinances. The Administrator – Clerk/Treasurer or designee shall determine the
appropriate backfill material upon inspection of the excavation. If the pavement restoration settles or cracks
within one year from the date of the permit due to improper backfill or compaction, the pavement and backfill
shall be removed and replaced at the permittee’s expense as directed by the Administrator – Clerk/Treasurer or
designee. If the permittee's restoration efforts do not meet the City's standards, the City reserves the right to
notify the permittee and invoice them for the cost of completing or correcting the restoration using City staff or
contracted services.
9. The issuance of a permit does not make the City of Oconto Falls, its departments, commissions, employees, or
agents liable for any private improvement /utility made or placed within the right -of-way. The permitted
utilities/improvements shall, if necessary, be altered at the expense of the permittee to permit alteration,
improvement or maintenance of the highway as may hereafter be ordered. The entire premium cost of
constructing and maintaining the permitted utilities/improvements shall be the obligation of the permittee unless
a contract for such costs has been executed.
10. A copy of this permit, along with any plans and special provisions, shall be available on the job site.
11. Upon completion of the permitted work, the permittee shall file a written notice of completion with the City.
Oconto Falls Municipal Utilities
Water, Light, and Sewage Disposal Commissions
500 N. Chestnut Avenue • P.O. Box 70 • Oconto Falls, WI 54154-0070
Tel: (920) 846-4507 • FAX: (920) 846-4516
UTILITY CONNECTION APPLICATION
Date of Application: ____________________________________________________________
APPLICANT INFORMATION
Applicant Name: ________________________________________________________________________________
Address: ________________________________________________________________________________
City, State, ZIP: ________________________________________________________________________________
Phone Number: ________________________________________________________________________________
Email: ________________________________________________________________________________
CONTRACTOR INFORMATION
Contractor Name: ________________________________________________________________________________
Contact: ________________________________________________________________________________
Address: ________________________________________________________________________________
City, State, ZIP: ________________________________________________________________________________
Phone Number: ________________________________________________________________________________
Email: ________________________________________________________________________________
CONNECTION DETAILS
Connection to be made (select all that apply): ☐ Electric ☐ Water ☐ Sewer
Location of Connection: ________________________________________________________________________________
Additional Information: ________________________________________________________________________________
________________________________________________________________________________
APPLICANT / CONTRACTOR ACKNOWLEDGMENT
I
understand that authorization to connect to the municipal utility system noted above does not relieve me of my responsibility to contact
DIGGERS HOTLINE three (3) working days before beginning any work described in this application; obtain all other permits required by
governmental agencies; provide proper protection of the public through decontamination of the facility being connected and proper
barricading and signing of the work area; ensure utility work is properly inspected before covering; minimize damage to public streets
and facilities; and repair damaged property to the specifications of private owners and the municipality. I further understand that any
repair costs for damage to public property may be assessed to the applicant if the applicant fails to properly repair such damage to
municipal specifications. I acknowledge that I have reviewed the City’s Utility Connection Ordinance (445).
Applicant/Contractor Signature: __________________________________________ Date: ________________
FOR MUNICIPAL USE ONLY
Has Excavation Permit been approved? ☐ Yes ☐ No
Has applicant completed a Service Application? ☐ Yes ☐ No
Source: City of Oconto Falls website. First collected Oct 29, 2026.