Historic Preservation Committee — Agenda packet
Village of Ephraim · Door County · Historic Preservation Committee · meeting of Oct 27, 2026 · Agenda packets
Open the original document More from Village of Ephraim
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
VILLAGE OF EPHRAIM
FOUNDED 1853
HISTORIC PRESERVATION COMMITTEE AGENDA
Tuesday, October 27, 2026 – 6:30 pm
9996 Water Street
NOTE: SO LONG AS INTERNET SERVICE IS AVAILABLE, THIS MEETING WILL BE
SIMULTANEOUSLY HELD VIA TELECONFERENCING. STAFF, COMMITTEE MEMBERS AND THE
PUBLIC ARE WELCOME TO PARTICIPATE IN THIS MANNER. TELECONFERENCING WILL BE
AVAILABLE BY COMPUTER, PHONE, TABLET, OR DIAL-IN. CONNECTION INFORMATION BELOW:
1. Call to Order
2. Quorum
3. Changes in Agenda
4. Visitors’ Comments
5. Approve Previous HPC Minutes
6. John Maher –9992 Moravia St. – Railing & Pergola – Design Review
7. Julia Uihlein – 10235 Water St. - Accessory structures – Design Review
8. New Business for Next Meeting/Next Meeting Date
9. Adjournment
Please join my meeting from your computer, tablet or smartphone.
https://meet.goto.com/126983765
You can also dial in using your phone.
Access Code: 126-983-765
United States: +1 (646) 749-3122
* It is possible that a quorum of the Village Board or other Village Committees may be present at the meeting. However,
no action will be taken by the Board or any other committee unless specifically noticed.
Date: 10/23/2026
Andrea Collak, Clerk X Village Administrative Office
X Library
X Post Office
Kim Roberts, Deputy Clerk X Website www.ephraim.wi.gov
X Emailed to WDOR Radio
X Emailed to Peninsula Pulse
Administrative Office 10005 Norway Road PO Box 138 Ephraim WI 54211
Phone: (920) 854-5501 Fax: (920) 854-2072 E-Mail: office@ephraim.wi.gov
1
VILLAGE OF EPHRAIM
HISTORIC PRESERV ATION COMMITTEE
MEETING MINUTES
TUESDAY, SEPTEMBER 22, 2026 – 6:30 PM
9996 WATER STREET
ACTION ITEMS:
Ellis moved, Russell seconded to approve the July 28, 2026 Historic Preservation Committee minutes as
presented, all ayes. Motion carried.
Russell moved, Ellis seconded to recommend approval to the Plan Committee for the Addition Design
Review Application for Devin Wolf at 9815 Water Street, all ayes. Motion carried.
Russell moved, Ellis seconded to approve the Garage Design Review Application for 9992 Moravia Street
for John Maher, all ayes. Motion carried.
Pentler moved, Ellis seconded to adjourn at 6:54 PM, all ayes. Motion carried.
Present: Marcia Ellis, Kathy Pentler (online), Amy Russell, and BD Thorp – Chair.
Absent: Cody Schreck.
Staff: Brent Bristol - Village Administrator and Kim Roberts - Deputy Clerk.
Guests in person: Ken Nelson, Andy Bartelt, Monique McClean, and Sandy Van Sickle.
Guests online: Brian Rosner (DeLeers Construction), Jason Reinhardt (DeLeers Construction), and John
Maher.
1. Call to order:
Thorp called the meeting to order at 6:30 PM.
2. Quorum:
A quorum of the Historic Preservation Committee was present.
3. Changes in agenda:
There were no changes to the agenda.
4. Visitors’ Comments:
There were no visitors’ comments.
5. Approval of previous minutes:
Ellis moved, Russell seconded to approve the July 28, 2026 Historic Preservation Committee
minutes as presented, all ayes. Motion carried.
6. Devin Wolf – 9815 Water Street – Addition – Design Review:
Bristol introduced the application for Devin Wolf's property at 9815 Water Street, a waterfront cottage at
the south end of the Village. He explained that the project originated as a foundation replacement, a
process in which the existing log structure is lifted, a new foundation is installed beneath it, and the
structure is set back down. It is a technique consistent with similar historic log building projects along the
waterfront. During the course of that work, the owner and contractor, Jack Opitz, identified a desire to add
a small addition to the backside of the cottage. The application before the Committee is for a design
review application for a 98.4 square foot addition to the rear of the log cottage. Bristol noted that the
addition would be constructed of wood, with vertical wood siding chosen to complement the existing
horizontal log construction in color.
Committee members expressed support for the application noting the addition was a reasonable size and
that it preserved the historic look of the structure.
2
Russell moved, Ellis seconded to recommend approval to the Plan Committee for the Addition
Design Review Application for Devin Wolf at 9815 Water Street, all ayes. Motion carried.
7. John Maher – 9992 Moravia Street – Garage and Remodel – Design Review:
Bristol introduced the application for John Maher's property at 9992 Moravia Street, located just north of
the Bethany Parsonage. He noted that he had been in discussions with Maher regarding the need for
additional storage and a garage solution for at least a year. The proposal consists of a roughly 25-by-25-
foot garage to be constructed on the east/backside of the existing house, situated in an alcove near the
current propane tank location. Bristol noted that the existing driveway and parking disturbances are
concentrated in that area, and that the sloping grade on the backside of the property would require
retaining walls, particularly on the north side of the proposed structure. He estimated that approximately
ten (10) cedar trees would need to be removed. From a dimensional standpoint, he indicated no concerns
on his end. He confirmed that design treatments for the garage are intended to match the existing building,
and that the existing shed, which once housed a washer and dryer and a powder room would be removed
as part of the project.
John Maher clarified that when he and his family purchased the house 25 years ago, the washer and dryer
were originally in that shed, but they have since been relocated inside the house to a converted closet. He
confirmed that only storage and a small powder room remain in the shed.
A discussion was held regarding the Garage and Remodel Design Review Application for 9992 Moravia
Street. Pentler asked whether the laundry and bathroom would be incorporated into the new garage.
Maher confirmed they would not. The only special-use space in the garage would be a small, roughly 9-
by-6-foot temperature-controlled room in the north front corner, described as a "butler's pantry" intended
for excess kitchen storage, beverages, and food items. This room would have no water. Maher clarified
that a side door on the garage leads into this butler's pantry, with no interior door connecting it to the
garage bay itself. The only access to the garage is through the garage door on the front. Pentler stated that
as long as the structure matches the home and meets the Village's specifications, she had no objection.
Russell noted that the garage is positioned behind the house and largely hidden, but raised a question
about the cedar shingle detailing visible at the top of the garage in the drawings, asking whether it was
consistent with the character and design of the main house. Maher explained that DeLeers, the project
designer, had specifically incorporated the cedar shake elements from the side of the house that faces the
schoolhouse, as well as decorative corner elements from the existing building, into the garage design. He
noted that these repeated design elements would be visible upon approaching the driveway and at the top
of the garage facade, resulting in a cohesive appearance. Ellis stated she had driven by the property that
day and raised several questions: Whether blasting or dynamiting into the bluff would be necessary,
whether the propane tank would be relocated, and what the drainage and runoff plans were.
Representatives from DeLeers confirmed that the propane tank would be relocated after the garage is
constructed. Regarding blasting, it was noted that the extent of rock removal was not yet fully determined,
it was possible that chipping rather than full blasting could be sufficient for the foundation work. On the
drainage question, the contractor explained that a drainage system would be installed behind the garage
and tied into daylight on the backside of the hill. Maher added that a French drain had been discussed with
a landscaper, to be located in the corner at the base of the bluff to capture water running down from
above. He noted that existing plantings near the base of the bluff already capture a significant amount of
runoff. Pentler interjected to note a particular concern regarding the adjacent schoolhouse, which has
archives stored in its basement. She emphasized that it was imperative that drainage not be directed
toward the schoolhouse.
Thorp asked whether the garage would extend approximately seven to eight feet north of the main
building's north corner, based on the western elevation drawing. The representative from DeLeers
confirmed this was correct, explaining that the setback from the building was necessary to allow sufficient
space for a vehicle to maneuver out of the garage and turn around, given the tightness of the site. Thorp
asked whether Maher had considered burying the propane tank, particularly if blasting was already being
planned. Maher indicated that this had not been discussed.
3
Sandy Van Sickle, of 3035 Church Street, addressed the Committee. She expressed concern about
stormwater runoff, noting that her property on Church Street already experiences significant water issues
originating from Moravia Street and the hill. She asked whether gutters or other measures were planned
for the garage to manage runoff.
Thorp acknowledged her concern and indicated it had been partly addressed during discussion, and that
the matter would be taken up again during the Plan Committee meeting, to which Van Sickle was invited
to attend.
Remodel – Railing on Western Facade – Design Review
The interior remodel component of the application, which included a small number of window and door
changes, was generally straightforward. However, Bristol flagged that the western elevation of the
drawings revealed a proposed new railing on the flat roof area above the first-floor living space. This flat
roof is currently accessible via an existing door, but has no railing a condition that would not meet current
code if constructed today. The proposed remodel includes replacing that door with a patio-style slider and
adding a railing around the flat roof perimeter, which Bristol fully understood from a safety standpoint,
particularly given Maher's mention of grandchildren. However, since the railing constitutes new exterior
work, Bristol indicated it was subject to setback requirements that he had not yet been able to fully verify.
Maher confirmed that the railing design would match the existing deck railing, the same materials and
style used on a deck installed three to four years prior, and that this consistency was intentional.
Russell noted she would not have a problem with the railing matching what was below, but expressed a
preference that the mullions on the new door match the character of older-style windows on the building.
Maher responded that the replacement slider would include mullions, and noted more broadly that the
family is in the process of replacing remaining windows throughout the house with mullioned Marvin
windows.
The Committee agreed that the railing application should be tabled and brought back at the next meeting,
at which point the full remodel application — including both the railing and any other outstanding items
could be acted upon together.
Russell moved, Ellis seconded to approve the Garage Design Review Application for 9992 Moravia
Street for John Maher, all ayes. Motion carried.
8. New Business for next meeting / next meeting date:
No new business was noted.
The next meeting of the Historic Preservation Committee is October 27, 2026.
9. Adjournment:
Pentler moved, Ellis seconded to adjourn at 6:54 PM, all ayes. Motion carried.
Recorded by, Kim Roberts – Deputy Clerk
S:\EPHRAIM\Office Forms\Zoning\Forms\Building\BUILDING PERMIT APPLICATION.doc 1
Pl
ease Print
1.
Owner/Property Tax Parcel. No. __________-___________-_____________
Owner_____________________________________________
Mailing Address ____________________ City _________________________
State ___________________________________________ Zip __________________________
Phone(s) ______________________________________ Email _________________
Location of Project ______________________________ Nearest Cross Street _____________________
Property Use: ______________________________________________________________________
Zoning Area: ______________________ Historic District?
Yes No
Co
ntractor/Contact: ____________________________Address ________
Phone(s) _________________________ Cell Phone
2. Type of Improvement
___ New Building Ac cessory Structures
___ A
ddition ___ Garage
___ Exterior Alteration ___ Storage Building
___ Foundation Work Only ___ Repair/Replacement
___ Other ___________________ ___Other__________________
3. Describe Proposed Construction: __________________________________________
________________________________________________________________________
4. Cost
Total cost of improvements as applied for in permit: $________________
Structural Improvement Cost (if new building or addition, entire amount of structure; if alteration,
renovation or repair, structural portions only): $________________
Inc
lude with Application:
Certified Survey
Building plans, including all elevations, floor plans
(if commercial, State-approved plans must be given to the office prior to obtaining your permit)
Site plan showing lot dimensions, setbacks from all lot lines for structures
For commercial structures, parking plans
Parking plan for construction vehicles during construction phase
Permit Fee/Impact Fee Land Disturbance Application
Drainage Plan Landscape Plan
VILLAGE OF EPHRAIM
BUILDING/Z
ONING PERMIT APPLICATION
1 of 2
Application Date
______________
X
X Interior Remodel
Interior remodel consisting of bathroom additions and Window and Door
replacement. Exterior: Addition of a detached 25x25 garage.
John J Maher
Madison
Wisconsin 53711
9992 Moravia St Church St
Residential Home
R1 Single-Family Residential
Jason Reinhardt
x
X
X
121240024B
08/31/2026
150,000
110,000
S:\EPHRAIM\Office Forms\Zoning\Forms\Building\BUILDING PERMIT APPLICATION.doc 2
Dimensions: Number of Stories: ____________ Height at Peak: _______________________
Roof Pitch(es): _____________________ Total Footprint, Exterior: _______________
Tot
al Square Footage, All Floors Exterior: ________________
Total Square Footage, Parking/Drives/Walkways: ______________________________
Type: Wood Frame Structural Steel Reinforced Concrete Other___________________
Pr
incipal Heating: ___ Propane ___ Oil ___ Electric
___ Other
(Explain)_____________________________________________
Plant Manager
Signature__________________________Date__________
Sewage Disposal:
Current: Proposed :
None Current System Continued Demolition/Moving ?
Sewered Connect to Available Sewer
Septic Extend Sewer to Property
Mound/In-Ground On-Site System
Other ___________________ Type: ____________________________________________
(copy of permit to be on file with Village)
Year Installed: ____________ If On-Site System, Year Last Pumped/Inspected: _________
For sewage disposal planning, your contact is the Ephraim Treatment Plant Manager, 920/854-4991.
Please contact him as soon as possible to allow proper planning and discussion of any necessary sewer
connection permits or fees involved.
Fire Chief Signature _________________________Date____________
Fire Department: Sprinklers needed? /box3 Yes /box3 No
Driveway width/tree clearance (width/height): _______________________
Clearance around structures for truck access: ________________________ Fire # Assigned __________
Fire Department requires driveways at least 12’ wide and clearance 12’ high; Fire Chief may be in
contact with you during construction to check truck access and, if commercial structure, any
sprinklering, water sources, or other safety considerations
Application and materials must be in the Village offices one week prior
to Plan Committee meeting date
to
allow for proper processing and notification of Committee members. When permits are issued, work
must start within 6 months and be completed within one year. The owner of this property and the
undersigned agree to conform to all applicable laws of the State of Wisconsin and the Village of Ephraim.
Signature of Applicant___________________________ Print Name _____________________________
FOR
OFFICE USE ONLY
For New Buildings or Additions, Complete this Section Also:
Pe
rmit #_____________________________ Permit Fee: $_________________________________
Date Permit Issued ___________ Zoning Administrator Signature:_________________________________
Restrictions: _____________________________________________________________________________
2 of 2
1
25x255/12
625 SQFT
X
X
16'
Jason C Reinhardt
Village of Ephraim Historic District Design Review Checklist
THIS FORM MUST BE COMPLETELY FILLED OUT TO BE CONSIDERED BY HPC AND/OR THE PLAN COMMITTEE.
This checklist reflects the identified standards of design review for new construction in the Village of Ephraim. Under each
subsection, please briefly describe the construction plans as they apply to each. The more detail, the better. Some of these standards
will be identified visually on the construction plans, but we do ask that you describe them herein and provide any additional
information, such as drawings and/or plans, that will help streamline the process. The standards can be found in §17.15(13) ( Design
Review), §17.26(11) (Historic District), and §17.20 (Protected Waterfront).
Material and color samples must be provided as well as photos of the existing structure for evaluation by the
Historic Preservation Committee for referral to the Plan Committee.
1 OWNER INFORMATION: * Please provide a mailing address where you can receive mail.
Owner Name: John Maher
Owner Street Address :
City: Madison State: Zip: 53711
Phone #1: Phone #2:
Email:
2 PROPERTY INFORMATION:
Property Address (Please list all applicable fire
numbers): 9992 Moravia St
3 STRUCTURE FORM / BUILDING DESIGN
Please describe the architecture of the building/ building design. Ordinance narrative: Ephraim is known for its traditional architecture, simple
rectangular forms, gable and hip roofs, and frame construction. (If additional space is required, please use the back of page 4)
We plan to match the design, style and color of the existing structure.
4 SITE & DEVELOPMENT PLANNING
Please describe the site plan. Ordinance narrative: Please refer to §17.15 and the table of standards. Ensure that the layout adheres to zoning
setbacks and zoning code. (If additional space is required, please use the back of page 4)
5 ARCHITECTURAL DETAILS
Please describe the architectural details including such items as window and door shapes. Ordinance narrative: Architectural details should
reflect the traditional architecture of the Village which is known for its simple rectangular building forms, gable & hip roofs, and frame construction.
Simplicity is the keyword. (If additional space is required, please use the back of page 4)
Rectangle windows and doors.
6 COLORS/MATERIALS
Please describe the color and materials for the following characteristics of the project design. Ordinance narrative: White is the distinctive historic color of the
Village. Wood and natural stone are recommended. Unfinished or galvanized metal siding or roofing is discouraged. To achieve unity, there are distinguishing colors
that are appropriate and compatible for the Historic District, which include white, naturally weathered wood, or natural wood. Fluorescent and bright colors are
prohibited. Wrought iron is not an acceptable material in the Historic District.
Structure(s): Color: Material:
Building(s): Color: Material:
Siding: (Please note vertical or
horizontal) Color: Brown Material: Horizontal Cedar
Roof: Color: Match house Material: Asphalt
Trim: Color: Match house Material: Wood
Sash: Color: Material:
Chimney: Color: Material:
Window Frames: Color: White Material: Aluminum
Window: Color: Material:
Door Frames: Color: White Material: Aluminum
Doors: Color: White Material: Aluminum or steel
Shutters: Color: Material:
Fences: Color: Material:
Gates: Color: Material:
Porch Trim: Color: Material:
Handrails: Color: Brown Material: Composite
Guardrails: Color: Material:
Driveway: Color: Material:
Sidewalk: Color: Material:
Patio/Deck: Color: Material:
Other
Architectural/
Ornamental
Features (describe
and detail color and
materials):
Color(s):
Material(s):
7 UTILITY WIRING (Location)
Please describe and show all utility service wiring on the plot plan. Ordinance narrative : Utility service wiring should be brought to a structure underground, if at
all possible. (If additional space is required, please use the back of page 4)
We will installing a new exterior panel to the back side of the house and running the wire underground to
supply power to the new garage and garage panel.
8 ROOF PITCH
Please describe the roof design. Ordinance narrative : Pitches less than 3/12 and/or 12/12 are subject to further design review. In the Historic
District, tar and gravel roofs are not compatible. Unfinished or galvanized metal siding or roofing is highly discouraged in all zoning districts, but a
metal roof requires a conditional use in the Historic District. In the Protected Waterfront District, primary roof pitches less than 6/12 or more than
12/12 are prohibited. Additionally, in the PW, up to 50% of the total roof pitch can be made up of dormers that may be less than 6/12 but in no
case may they be less than 3/12. (If additional space is required, please use the back of page 4)
Gable roof with a 5/12 pitch.
9 CHIMNEY
Please describe in detail the chimney, along with all venting and exhaust flues, along with their height. Ordinance narrative: In the Protected
Waterfront District, nothing can penetrate above 25 feet in height (including all venting and exhaust flues), with the roof line not exceeding 23 feet.
In all other districts, chimneys are allowed up to a maximum of 35 feet from grade.
10 SIZE AND LAYOUT OF STRUCTURE
Please explain project plans for square footage and floor area, as well as plans for variations in material or lines to create diversity.
Ordinance narrative : Any structure in any district that is proposed, by way of initial construction or successive additions, to have in excess of 5,000
square feet in floor area or 50,000 cubic feet in bulk requires special attention to avoid overbuilding of a site or overpowering the environs where
prevailing structural sizes are smaller. No single building face of 50 feet or more in length shall be uninterrupted. (If additional space is required,
please use the back of page 4)
The project is a 25' x 25' garage equaling 625 SQFT
11 DRIVEWAY, SIDEWALK(s), & PATIO (OR DECK)
Please describe and provide plans for driveways, sidewalks, patios, and decks. Ordinance narrative : Native flagstone is an excellent substitute
for concrete and asphalt in pedestrian areas. Where paving is used, it shall be kept to a minimum and buffered with landscaping when possible. (If
additional space is required, please use the back of page 4)
At this time we are planning to use the existing driveway.
12 LANDSCAPING PLANS / FENCES
Please describe and provide the landscaping plans, noting details such as hardscape and softscape. Ordinance narrative : Plantings rather
than large expanses of grass lawn are to be encouraged, and live native plants should be used. Recognizing that the open shoreline is one of
Ephraim’s most distinctive features, the intent of this ordinance is to provide for as much open viewing space along our shoreline as possible in the
PW district. (If additional space is required, please use the back of page 4)
Landscaping will remain the same and unchanged as much as possible.
13 ADDITIONAL FEATURES
14 SIGNATURE
Signature of Applicant:
Date:
09/18/2026
Internal Use Only
Date Received:
Complete Application Color and Material Samples Provided □Yes □No
Existing Structure Photos Provided □Yes □No
15 ADDITIONAL SPACE
UP
DN
UP
U.C.
Refr.
DN
KITCHEN
101
FAMILY ROOM
105
DINING
104
STORAGE
102
LINEN
SLOPED
CLG
SLOPED CLG
HALL
204
BATH
203
STAIR
200
BEDROOM
201
BEDROOM
202
PRIMARY BEDROOM
205
P. BATH
206
LINEN
FLAT ROOF
8-3/4" STEP UP
KITCHEN
101
FAMILY ROOM
105
DINING
104
NEW
LDRY/POWDER
107NEW WET BAR
106
LINEN
7' - 2 1/2" 8' - 3 1/4"
9' - 6 3/4"
SUBZERO UNDER
COUNTER DRAWER
PULL-OUT
CABINET STORAGE
2' - 1"
CAB.CAB.
ICE
MAKER
REPLACE WINDOW
REPLACE WINDOW
3 1/2"
5' - 10 3/4"
3 1/2"
3' - 1"
HALL
204
BATH
203
STAIR
200
BEDROOM
201
BEDROOM
202
PRIMARY BEDROOM
205
FLAT ROOF
8-3/4" STEP UP
P. BATH
206
SHOWER
209
2' - 0 1/2"
3 1/2"
3' - 6"5' - 6" 3' - 0"
5' - 5 1/4"
4' - 4"
3' - 10"
3 1/2"
3' - 7"
3 1/2"
2' - 1"
12' - 7 1/4"
NICHE
NICHE
RMC
RECESSED MED. CAB.
REPLACE WINDOW
WALL KEY
2x6 WOOD STUD WALL
2x4 WOOD STUD WALL
BEARING 2x4 WOOD STUD WALL
2x2 WOOD STUD WALL
DEMOLISHED WALL
DATE:
SHEET:
DESIGN NO:
DRAWN BY:
DESIGNER:
"COPYRIGHT NOTICE"
© DeLeers Construction, Inc. 2024/ Jeremy Lueck. - All
specifications, plans, designs and documents created
under this agreement are copyright protected and may
not be sold, traded, transferred altered to or by any other
party other than the owner, without the express written
consent of the Designer and DeLeers Construction, Inc.
B.D.A.: PRE-CONTRACT
UPDATES:
BID SET A1.1
9.2.26 9992 Moravia St, Ephraim, WI 54211
Maher ResidenceBD25-12-09
Lucas Rentmeester
...
Brian Rosner
1.16.26
6.1.26
8.12.26
9.2.26 BID SET
...
...
REMODEL PLANS
1/4" = 1'-0"A1.1
1 EXISTING/DEMO FIRST FLOOR PLAN
1/4" = 1'-0"A1.1
2 EXISTING/DEMO SECOND FLOOR PLAN
1/4" = 1'-0"A1.1
3 REMODELED FIRST FLOOR PLAN
1/4" = 1'-0"A1.1
4 REMODELED SECOND FLOOR PLAN
CONSTRUCTION SET REVISIONS
DATE:
SHEET:
DESIGN NO:
DRAWN BY:
DESIGNER:
"COPYRIGHT NOTICE"
© DeLeers Construction, Inc. 2024/ Jeremy Lueck. - All
specifications, plans, designs and documents created
under this agreement are copyright protected and may
not be sold, traded, transferred altered to or by any other
party other than the owner, without the express written
consent of the Designer and DeLeers Construction, Inc.
B.D.A.: PRE-CONTRACT
UPDATES:
BID SET A2.1
9.2.26 9992 Moravia St, Ephraim, WI 54211
Maher ResidenceBD25-12-09
Lucas Rentmeester
...
Brian Rosner
1.16.26
6.1.26
8.12.26
9.2.26 BID SET
...
...
EXTERIOR ELEVATIONS
CONSTRUCTION SET REVISIONS
1/4" = 1'-0"A2.1
1 WEST ELEVATION
1/4" = 1'-0"A2.1
2 SOUTH ELEVATION
1/4" = 1'-0"A2.1
3 GARAGE WEST ELEVATION
DATE:
SHEET:
DESIGN NO:
DRAWN BY:
DESIGNER:
"COPYRIGHT NOTICE"
© DeLeers Construction, Inc. 2024/ Jeremy Lueck. - All
specifications, plans, designs and documents created
under this agreement are copyright protected and may
not be sold, traded, transferred altered to or by any other
party other than the owner, without the express written
consent of the Designer and DeLeers Construction, Inc.
B.D.A.: PRE-CONTRACT
UPDATES:
BID SET A2.2
9.2.26 9992 Moravia St, Ephraim, WI 54211
Maher ResidenceBD25-12-09
Lucas Rentmeester
...
Brian Rosner
1.16.26
6.1.26
8.12.26
9.2.26 BID SET
...
...
EXTERIOR ELEVATIONS
CONSTRUCTION SET REVISIONS
1/4" = 1'-0"A2.2
1 EAST ELEVATION
1/4" = 1'-0"A2.2
2 NORTH ELEVATION
DATE:
SHEET:
DESIGN NO:
DRAWN BY:
DESIGNER:
"COPYRIGHT NOTICE"
© DeLeers Construction, Inc. 2024/ Jeremy Lueck. - All
specifications, plans, designs and documents created
under this agreement are copyright protected and may
not be sold, traded, transferred altered to or by any other
party other than the owner, without the express written
consent of the Designer and DeLeers Construction, Inc.
B.D.A.: PRE-CONTRACT
UPDATES:
BID SET A9.1
9.2.26 9992 Moravia St, Ephraim, WI 54211
Maher ResidenceBD25-12-09
Lucas Rentmeester
...
Brian Rosner
1.16.26
6.1.26
8.12.26
9.2.26 BID SET
...
...
3D VIEWS
A9.1
1 FIRST FLOOR 1
A9.1
2 SECOND FLOOR 1
CONSTRUCTION SET REVISIONS
A9.1
3 EXTERIOR SW
A9.1
4 EXTERIOR NE
NEW 25'X25'
DETACHED
GARAGE
89° 36' 05"
215.48'
N E
15° 59' 50"141.26'
S W
LANDSCAPE RETAINING
WALL (BY LANDSCAPE
TRADE PARTNER)
DATE:
SHEET:
DESIGN NO:
DRAWN BY:
DESIGNER:
"COPYRIGHT NOTICE"
© DeLeers Construction, Inc. 2024/ Jeremy Lueck. - All
specifications, plans, designs and documents created
under this agreement are copyright protected and may
not be sold, traded, transferred altered to or by any other
party other than the owner, without the express written
consent of the Designer and DeLeers Construction, Inc.
B.D.A.: PRE-CONTRACT
UPDATES:
BID SET C1.1
9.2.26 9992 Moravia St, Ephraim, WI 54211
Maher ResidenceBD25-12-09
Lucas Rentmeester
...
Brian Rosner
1.16.26
6.1.26
8.12.26
9.2.26 BID SET
...
...
SITE PLAN
1" = 20'-0"C1.1
1 SITE PLAN
CONSTRUCTION SET REVISIONS
*Zoning Admin. Note: Setback Average for property to N. and S. is 25' from the edge of ROW
Proposed Railings are aprox. 29' from the ROW.
I S S U A N C E :
A1.1
MECHANICAL PANEL
1" = 1'
N O R T H E L E V A T I O N
DAVID T GREENE + ASSOCIATES, LTD
DAVID GREENE & BOB ZAKARAS, AIA
9 3 3 1 S P R I N G R O A D , U N I T B - 2 1
F I S H C R E E K , W I 5 4 2 1 2
P H : 9 2 0 . 8 6 8 . 5 5 1 5
E M A I L : g r e e n e a r c h @ m s n . c o m
1
D A T E: 09. 28. 2026
' C E D A R S T O N E - M E C H A N I C A L E N C L O S U R E '
1" = 1'
W E S T E L E V A T I O N
2
1" = 1'
S O U T H E L E V A T I O N
3
1" = 1'
E A S T E L E V A T I O N
4
Source: Village of Ephraim website. First collected Oct 29, 2026.