July 16, 2026 Public Meeting
Village of Hewitt · Wood County · meeting of Jul 16, 2026 · Notices
Open the original document More from Village of Hewitt
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Public Meeting
On 1st and 2nd Street Project
Hewitt Village Hall
Thursday, July 16, 2026
Public Meeting on 1st & 2nd Street Project was called to order at 7:00 PM at the Hewitt Village Hall.
Residents Present: First Street – Tiffany & Anthony Valle, Paul Kuhlka, Mr. & Mrs. Borgen, Jerry Pretsch, Donna
Fahey, Rich Lauren. Second Street – Mr. Thompson, Ron Bredemann, Frank Akey, Kurt Sanger, Sandra Hudak,
Duane LaPointe, Ben Corcoran, Randy Helvey, Bill Kappel, Andrew Mitroshin. Others - Mike & Vickie Draxler
(Evergreen), Jeff Geisky (ERE Excavating), Rob Korth (Yellowstone Dr.), Tom M. (10976 Main St.), Mike Bell
(Main St.), Roger Meyer (Main St.) Travis Weinke, Tom Iwanski, Dan Sommers, Cassie Horn, Marlene Stueland,
Romelle Bymers, and two representative from Wood County Highway Dept.
A new design was introduced with a different way to reroute the water so that it doesn’t go down the 2nd St.
ditches. This would save the residents and Village about $300,000. Each resident that needs to get a different
culvert would need to contact their own contractor. The plan also cuts down on the number of culverts that
will be affected. About .772 acres was purchased for $25,000 north of Maple. There will be a culvert installed
for farmers to access the field.
Water on 2nd St. will keep north of Maple St. with a converter channel in the field. The residents should only
have to deal with roadway run off. About 24 culverts on 2nd St. will need to be replace or reset. If there is
drain tile it may be removed if it is not at the correct depth. The 2 current culverts on Maple will be removed
with ditching this summer. The field will be done later in the fall after the crop of off. Both sides of 2nd St. will
be ditched. The area has already been flagged.
On 1st St. about 95% of the ditches may be addressed with a few culvert changes. Top soil and reseeding will
be added after the project is complete. Ditches will to dug to the flow line.
End walls on culverts will be required only if the culvert has been changed. Rip rock in the ditches will not be
an option. If a new culvert is installed or a culvert is reset a hard cover on the driveways must be done.
Culverts will be plastic. End walls may be plastic or metal.
Ditching is being planned to start the week of July 27 or the first week in August depending on the weather. It
will take roughly about 2 weeks to complete the project. Resident’s may have their contractors working while
ditching is proceeding. Residents will need a building permit for new culverts. All new culverts and reset
culverts will need to be inspected by Travis and Mike to make sure they are set at the correct depth. Flow lines
will be set before the work begins and must be checks on completion. If residents want to add end wall to
their existing culverts, they will not need a permit.
Residents who will need a culvert change will be notified by the Village which will include the culvert size and
other details. The county will be working starting a 7 each morning, 4 days a week. The drawing of the work
plan may be posted on the website once it is finalized. There may be some adjustments to the plan once the
work has begun.
Respectfully submitted, Romelle Bymers
Source: Village of Hewitt website. First collected Oct 30, 2026.