AGENDA
PROPERTY & INFORMATION TECHNOLOGY COMMITTEE
DATE: Monday, November 2, 2026
TIME: 9:00 AM
LOCATION: Courthouse – Room 300
1. Call meeting to order
2. Public Comments
3. Approve minutes of October 5, 2026, meeting
4. Information Technology
a. Vouchers
b. Monthly Comments
5. Maintenance Dept.
a. Vouchers
b. Monthly Comments
c. Consider resolution for negotiation for property adjacent to Courthouse
d. Review Market St parking lot and Veterans Memorial design
6. Future Agenda Items
a. Dept. Head evaluations
7. Set date and time of next meeting – Monday, December 7, 2026
8. Adjourn
Join by phone
+1-408-418-9388 United States Toll
Access code: 2484 260 6661
Join by WebEx App or website
https://woodcountywi.webex.com/woodcountywi/j.php?MTID=mc84c175f34c4d5ac37f21ecdae58945b
Webinar number: 2484 260 6661
Webinar password: 110226
1
MINUTES
PROPERTY & INFORMATION TECHNOLOGY COMMITTEE
DATE: Monday, October 5, 2026
TIME: 9:00 AM
PLACE: Courthouse – Room 300
MEMBERS PRESENT: Al Breu, Dennis Polach, Paul Goldberg, Linda Casper, Brad Hamilton
OTHERS PRESENT: Trent Miner, County Clerk; See attached sign-in list
1. Chairman Breu called the meeting to order at 9:00 AM.
2. There was no public comment.
3. The minutes of the September 14, 2026, meeting were reviewed. Motion by Hamilton/Polach to
approve them as presented. Motion carried unanimously.
4. The Information Technology vouchers were reviewed. Motion by Goldberg/Hamilton to approve
as presented. Motion carried unanimously.
5. The IT Report was reviewed.
6. The Maintenance vouchers were reviewed. Motion by Hamilton/Polach to approve as
presented. Motion carried unanimously.
7. The Maintenance Report was reviewed and discussed.
8. Facilities Manager Van Tassel reviewed the appraisal received by the realtor for one of the
properties adjacent to the courthouse and discussed the next steps. He will draft a county
board resolution for next month’s meeting to allow for negotiations to commence between the
landowner and the county.
9. VanTassel received some initial conceptual drawings for the new parking lot in front of the
courthouse as well as reconfiguration of the Veterans Memorial area. The committee and
others present discussed various points of each. Van Tassel will bring back a couple of options
for the committee to approve at a future meeting.
10. The next meeting will be held on Monday, November 2, 2026, at 9:00 AM.
11. Chairman Breu declared the meeting adjourned at 9:56 AM.
Minutes taken by Trent Miner, County Clerk and are in draft form until approved at the next meeting.
2
3
Voucher
Vendor Name
Nature of Claim
Doc Date
Amount
Paid
27260372
AMAZON CAPITAL SERVICES
PHONE ACCESSORIES
09/25/2026
$13.56
P
27260373
CDW GOVERNMENT INC
ADOBE ACROBAT RENEWALS
09/14/2026
$2,703.69
P
27260374
CORE BTS INC
PROFESSIONAL SERVICES
09/24/2026
$980.00
P
27260375
RHYME (Portage)
HS COPIER/PRINTER
09/29/2026
$4,567.72
P
27260376
FRONTIER
PHONE CHARGES
09/19/2026
$158.70
P
27260377
AMAZON CAPITAL SERVICES
HS PRIVACY SCREENS FOR H.B.
09/29/2026
$52.99
P
27260378
AMAZON CAPITAL SERVICES
HS WEBCAM FOR S.D.
09/29/2026
$69.99
P
27260379
AMAZON CAPITAL SERVICES
IT PHONE CASE, SCRN PROTECTOR
10/01/2026
$9.99
P
27260380
AMAZON CAPITAL SERVICES
HS TRAINING HEADSETS
10/04/2026
$194.78
P
27260381
AMAZON CAPITAL SERVICES
HS HEADSETS
10/05/2026
$448.78
P
27260382
AT&T MOBILITY
MONTHLY CELL/HOTSPOT CHARGES
09/23/2026
$517.77
P
27260383
AT&T MOBILITY
MONTHLY CELL CHARGES
09/23/2026
$1,638.98
P
27260384
AT&T MOBILITY
MONTHLY CELL CHARGES
09/23/2026
$4,289.35
P
27260385
CHARTER COMMUNICATIONS (Pittsburgh)
INTERNET CHARGES
10/01/2026
$245.00
P
27260386
CHARTER COMMUNICATIONS (Pittsburgh)
WR FIBER
10/01/2026
$1,254.09
P
27260387
CHARTER COMMUNICATIONS (Pittsburgh)
MFLD FIBER
10/01/2026
$319.48
P
27260388
GOLDFAX
NETWORK FAXING AUG 2026
09/04/2026
$95.45
P
27260389
GOLDFAX
NETWORK FAXING SEPT 2026
10/05/2026
$67.95
P
27260390
INSIGHT PUBLIC SECTOR INC
2026 PC ORDER - MAINT
08/07/2026
$4,075.00
P
27260391
INSIGHT PUBLIC SECTOR INC
EMAIL SERVERS
09/23/2026
$8,391.37
P
27260392
TDS TELECOM
PHONE CHARGES
09/28/2026
$60.04
P
27260393
TDS TELECOM
PHONE CHARGES
09/28/2026
$45.28
P
27260394
TDS TELECOM
PHONE CHARGES
09/28/2026
$58.69
P
27260395
TDS TELECOM
PHONE CHARGES
09/28/2026
$17.15
P
27260396
RHYME BUSINESS PRODUCTS
PRINTER/COPIER CHARGES
10/03/2026
$8,479.16
P
27260397
AMAZON CAPITAL SERVICES
HS TRAINING HEADSETS
10/07/2026
$31.98
P
27260398
RHYME BUSINESS PRODUCTS
3RD QTR 2026 BILLING
10/06/2026
$10,501.72
P
27260399
T-MOBILE
CELL PHONE CHARGES
09/29/2026
$291.40
P
27260400
VERIZON
CELL CHGS ACCT 242258062-00001
10/01/2026
$4,679.41
P
27260401
CDW GOVERNMENT INC
2026 ALWAYS ON VPN RENEWAL
09/30/2026
$5,520.00
P
27260402
AMAZON CAPITAL SERVICES
HS WIRELESS MOUSE FOR B.H.
10/16/2026
$14.69
P
27260403
AMAZON CAPITAL SERVICES
HS WIRELESS MOUSE FOR M.S.
10/16/2026
$14.69
P
27260404
INSIGHT PUBLIC SECTOR INC
FN CURVED MONITOR
10/07/2026
$423.00
P
27260405
MNJ TECHNOLOGIES DIRECT INC
IT MONITOR AND DOCK
09/01/2026
$355.01
P
Committee Report
Report of claims for:
For the range of vouchers:
27260372 - 27260414
County of Wood
INFORMATION TECHNOLOGY
For the period of:
OCTOBER 2026
Report Run: 10/28/2026 2:30:34 PM
Page 1 of 2
4
Committee Report - County of Wood
27260372 - 27260414
INFORMATION TECHNOLOGY - OCTOBER
2026
Voucher
Vendor Name
Nature of Claim
Doc Date
Amount
Paid
27260406
CENTURYLINK
PHONE/LONG DISTANCE CHARGES
10/01/2026
$2.78
P
27260407
US BANK
LODGING, QUICKEN, FONT AWESOME
10/19/2026
$2,041.49
27260408
CDW GOVERNMENT INC
MT LOBBY PHONE
10/15/2026
$80.07
27260409
FRONTIER
PHONE CHARGES
10/19/2026
$160.62
27260410
INSIGHT PUBLIC SECTOR INC
2026 PWS MAINTENANCE RENEWAL
10/19/2026
$1,643.99
27260411
FTP TODAY INC (SHARETRU)
SHARETRU MFT SUBSCRIPTION
10/22/2026
$5,130.00
27260412
SOLARUS
PHONE CHGS ACCT 00063942-1
11/01/2026
$5,327.99
27260413
SOLARUS
PHONE CHGS ACCT 00077856-5
11/01/2026
$227.84
27260414
SOLARUS
PHONE CHGS ACCT 00061009-7
11/01/2026
$69.99
Grand Total:
$75,271.63
Committee Member:
Committee Member:
Committee Member:
Committee Chair:
Committee Member:
Signatures
Committee Member:
Committee Member:
Committee Member:
Committee Member:
Report Run: 10/28/2026 2:30:34 PM
Page 2 of 2
5
Wood County
WISCONSIN
Page 1 of 6
INFORMATION
TECHNOLOGY
October 2026
1. Penetration testing, an authorized and simulated cyberattack designed to find exploitable security
weakness, was performed and completed in September. Pen test results have been received and
analyzed, and IT staff continue to implement security improvement procedures.
2. Staff completed the mailbox cleanup in preparation for migration of the County Outlook email system to
Exchange Online. Department email migration began in August and was completed in October. With this
migration mailbox sizes will increase and an easier archiving solution will be implemented. Considerable
time was spent setting up the online mail server to prevent SPAM, Phishing and malware from reaching
Wood County staff inboxes. In November the final steps of migration, finishing the clean up of shared and
old mailboxes and moving external mailflow to the new environment will occur.
3. The County firewalls and management console were updated to address vulnerabilities. The management
console was also upgraded to a new version to support new firewall models.
4. Worked with the vendor who provides digital recording for Law Enforcement interviews to harden the
server that holds this data. This includes installing their recommended security software while ensuring
that we can maintain our ability to patch and monitor the server for malicious activity.
5. Created a new server for the Certificate Authority service. This will allow us to implement other security
hardening and maintain security patching. Migration to the new server will take place in November.
6. Updated the Wood County password policy to reflect the mandatory security standards required by
regulatory compliance frameworks. This change included increasing the password length and shortening
the time between password changes.
7. Reviewed and approved a request from Dispatch to utilize 911 Translate. 911 Translate is an AI phone and
webpage interpreter service. Their current translation service experiences delays at times, 911 Translate
should alleviate those delays.
8. The Citrix Netscalers and Console were updated to patch security vulnerabilities.
6
Wood County
WISCONSIN
Page 2 of 6
INFORMATION
TECHNOLOGY
9. Staff continue to prepare for the rollout of CoPilot, the County’s Artificial Intelligence (AI) Platform. In
preparation for the implementation of CoPilot, OneDrive has been configured and testing of the migration
process has begun. Progress has been made on moving home directories to OneDrive. Once the process is
streamlined, we will begin the roll out to the CoPilot pilot group. This group is a preliminary group from
several departments that will work with IT on implementation. This will involve setting up a Wood County
tenant to ensure County data is secure.
10. Triaged and followed up with 23 alerts from the County’s end point protection system. Manually
investigated and cleaned up each detection and worked with the vendor as needed. In every instance,
when an alert was triggered the end point protection system quarantined and stopped the process until an
investigation could be completed.
11. Employees submitted approximately 326 phishing emails to IT for review. Each submittal was reviewed.
Several were identified as legitimate phishing attempts. Filters were put in place to disallow mail from
known phishing senders.
12. Assisted CCAP, (Circuit Court Access Program) IT staff with UPS replacement and troubleshooting. State
equipment is currently utilizing County Data Center infrastructure. CCAP has requested to permanently
utilize County infrastructure. This request is under review.
13. Ordered a landline phone for Courthouse Maintenance reception area. People can simply pick up the
handset in the reception area and it will automatically ring staff in a preset order. This will make it easier
for people when they need to contact Maintenance staff. Configuration of the phone is underway and the
phone will be installed by early November.
14. Working on a project request from the Sheriff’s Department for the Enforcer platform that will manage
scheduling, reports, field training, fleet management and citations.
15. Reviewing a project request from Norwood for the SafetyZone portal. This is a safety event reporting
portal.
16. Continued work with the Finance Department and Treasurer’s Office on planning and implementing a new
general ledger accounting software system.
7
Wood County
WISCONSIN
Page 3 of 6
INFORMATION
TECHNOLOGY
17. A total of 14 actionable security alerts were received this month. Each incident was resolved.
18. Research and procedure outline is nearly complete to assist Highway staffs request to provide various
equipment training videos online\on-demand to their employees.
19. Programming staff continue support and system functionality improvement coding for the ESS, employee
self-service portal, system for payroll reports and employee benefits open enrollment. Preparation for
2027 open enrollment is complete.
20. Updates were applied to the firewalls to patch vulnerabilities.
21. Analyst, network and security review and research is complete for an app for Norwood residents to play an
ipad game, Heads Up.
22. Analyst review and research is complete for a request to use WhatsApp for Edgewater patient POA (Power
of Attorney) medical communication while the POA is out of Country. Project reviews continue to move to
the next review phase(s) which include network, security and administration.
23. Coordinating with the Clerk’s office and an AV vendor to support the Video Conferencing system in the
County Board rooms. This will be to assess, maintain and recommend any improvements as needs are
identified to ensure consistent and stable meeting operations.
24. The Countywide backup solution is up for renewal in 2026. Staff continue to meet with vendors to review
options to determine the best backup solution. A new backup solution was configured for M365
applications which includes Exchange Online and SharePoint. This addresses immediate backup needs
while allowing additional time to review options for onsite data backup.
25. Staff completed updating the IT Wiki, internal online documentation, to ensure all processes and
procedures are up to date. A section was added to track Project Request results that will allow easier
tracking of systems that have already been reviewed. Over 257 pages have been cleaned up and
revamped.
26. Staff continue to spend time reviewing possible solutions to replace the current camera systems at Wood
County dam locations.
8
Wood County
WISCONSIN
Page 4 of 6
INFORMATION
TECHNOLOGY
27. Completed a Sage HRMS, Payroll and HR software, quarter 3 update to the test environment. This update
is scheduled to be applied to the production environment in early November.
28. Wood County internet and intranet website updates are being posted continually as we work to keep
employees and citizens informed. The IT intranet website has been improved for user ease of use and
locating important resources and instructions. IT is working to cross-train additional staff to perform
website updates which will improve request accommodation.
29. Continued work on forms process improvement and document storage in Information Technology
leveraging Laserfiche.
30. Support is ongoing for Cyber Recruiter upgrades and super user support, the HRMS extension system and
website used for new hire applications. HR and IT met with the vendor to discuss upgrades, features, and
the cost of moving from on-premises to a hosted environment. The current on-prem system was
upgraded in early October and has caused issues again. To possibly resolve these issues, we begin
preparations to build a new server and installation of the applications.
31. Completed the rollout of the Software Restriction Policy to all County staff, effectively blocking software
installation in known exploitable locations, massively shrinking the potential for users to install
unapproved software either on purpose or by consequence of visiting a malicious internet site.
32. For the month of September, 636 helpdesk requests were created, with staff completing 618 tickets and
leaving 175 open requests. In addition, there are currently 164 project requests.
33. Support for GCS\Catalis property tax systems is ongoing Initial training and migration of the 34
municipalities to the new system is complete. Work and research continue to create and support an
import of tax data into Dynamics, the general ledger system.
34. IT network staff continue to work on mapping and documenting network infrastructure and hardware. This
includes detailed documentation, physical and logical diagrams, and config files backups.
35. The IT Security Team continues the Security Awareness Program. Additional security training is being
assigned to all who fail a phishing campaign.
9
Wood County
WISCONSIN
Page 5 of 6
INFORMATION
TECHNOLOGY
36. Addressing recent Personnel Action Form and other onboarding process concerns. Composing online
forms to streamline the flow of information to key stakeholders. Having all the information in one place
will allow the onboarding process to be as smooth and fast as possible for the hiring department, the new
hire, and all the departments involved in making sure the employee is setup for their first day.
37. Due to the delays in receiving hardware, staff have placed the 3rd and 4th quarter PC Replacement orders.
Traveled on-site to County facilities to place new equipment deployments for orders that did arrive. Most
of Quarter 1 -3 have been placed. Only a few computers are left to image and deploy. Followed up on
quarter 4 desktops to see when devices will be back in stock and shipped.
38. Due to substantial increases in desktop and laptop prices IT staff continue to review options with multiple
vendors in effort to reduce the impact to the PC replacement fund and department budgets. If other
options cannot be identified for a reduced cost IT will have to increase charges in the 2028 budget to all
departments to cover the actual cost of new devices.
39. Implementation phase is complete for a project for the Highway Department to replace the former
Highway permit system with Delasoft vendor software. System go-live was September 22nd and the
public can now access the new system online. Analyst review and research is complete for a Highway
project requests for software installation and configuration to support a traffic counting\radar system and
devices.
40. Continue working with vendor to review the upgrade or replacement of Winscribe, dictation software.
41. Programming staff continue courses and training to maintain and advance best practices concerning code,
security and support of in-house developed systems. Cross training additional staff to support in-house
code has begun.
42. Norwood and Edgewater Matrix Claims Management support continues with multi-factor authentication
(MFA) migration to a new system evolving constantly. Account work for new backup procedures for
Claims Management continues. Claims user setup process was tested, refined and step by step
procedures documented.
10
Wood County
WISCONSIN
Page 6 of 6
INFORMATION
TECHNOLOGY
43. IT staff work to schedule and upgrade various server operating systems and database management
systems, SQL server for the most recent cycle is nearly complete. This ongoing project takes considerable
time to plan, test, and implement.
44. Support for Norwood Healthcare Center and Edgewater Haven Matrix (EHR) and CART (CMS abstraction
and reporting tool) software is ongoing. Psychiatric reporting annual submissions were successfully
completed by the deadline. IT support works to improve the user reliance on IT for basic system
functionality. eMAR provides ability to dispense patient medication when the EHR system is not
accessible. Super user training continues and results in improved support of the EHR (electronic health
record) system.
45. The TimeStar, electronic timecard and time tracking software system configuration changes is ongoing.
Staff work to adjust settings as change requests continue. PBJ reports are submitted to CMS (Centers for
Medicare & Medicaid) using TimeStar data for both the Edgewater and Norwood Facilities. PBJ mapping
update work to support new job codes is complete for existing codes. TimeStar app and server upgrade
and patching is scheduled for early November.
46. The Register of Deeds work to upgrade applications is scheduled for early January. IT staff escorts and
assists the vendor, Fidlar Technologies, with server and application updates and maintenance on a regular
basis. Work to increase server security via user account permissions and port access is scheduled for early
November 2026. Review and research regarding the Fidlar Tech hosted solution and backup solution is
complete. Discussion concerning use of a hosted backup solution to meet needs is scheduled.
47. Discussions with Maintenance continue regarding space needs for the IT department. There is significant
increase of technology being supported in the LEC and the increase of staff and services in other
Departments within the County increases the demands on IT support as well. IT will need additional IT staff
and space in order to properly support the County’s expanded facilities, staff, software, hardware, systems
and the increased reliance on technology. The IT Conference room now serves as our vendor staging area,
network setup area, equipment storage and conference room. We have repurposed and triple purposed
as much space as possible. IT needs more space to function properly.
11
Voucher
Vendor Name
Nature of Claim
Doc Date
Amount
Paid
19260642
ROTO GRAPHIC PRINTING INC
Envelopes-Finance
09/30/2026
$67.00
P
19260643
AMAZON CAPITAL SERVICES
CH SIGNAGE
10/01/2026
$37.90
P
19260644
AMAZON CAPITAL SERVICES
FUEL TRANSFER PUMP
10/02/2026
$313.85
P
19260645
BASSETT MECHANICAL
WALK IN COOLER REPAIRS
09/23/2026
$13,415.17
P
19260646
CONSOLIDATED WATER POWER COMPANY
RIVER BLOCK ELECTRIC SEPT 2026
10/01/2026
$6,193.40
P
19260647
CRESCENT ELECTRIC SUPPLY CO
LED LAMPS
09/23/2026
$498.80
P
19260648
GAPPA SECURITY SOLUTIONS LLC
CH SECURITY - LOCKSET
09/29/2026
$338.80
P
19260649
GAPPA SECURITY SOLUTIONS LLC
CH UPDATES - LOCKSETS
10/01/2026
$732.40
P
19260650
HARTERS EXPERT DISPOSAL
WASTE DISPOSAL FEES
10/01/2026
$1,023.85
P
19260651
JOHNSON CONTROLS BUILDING SOLUTIONS LLC
JAIL CHILLER SERVICE CALL
09/23/2026
$3,382.23
P
19260652
RAPID QUALITY LAWN & LANDSCAPING
FERTILIZER & WEED CONTROL
09/26/2026
$304.00
P
19260653
RAPIDS SIGN INC
VEHICLE DECALS
09/30/2026
$252.00
P
19260654
VENTURE ARCHITECTS
CH ACCESS & PARKING LOT DESIGN
09/28/2026
$3,811.04
P
19260655
AMAZON CAPITAL SERVICES
AIR FILTER FOR TRACTOR
10/06/2026
$21.60
P
19260656
AMAZON CAPITAL SERVICES
INK CARTRIDGES
10/09/2026
$193.49
P
19260657
BADGER PLASTICS & SUPPLY INC
SUPPLIES
03/02/2026
$419.35
P
19260658
BASSETT MECHANICAL
INSPECT COOLER CONDENSER
10/08/2026
$2,638.28
P
19260659
COMPLETE CONTROL
CHILLER SERVICE CALL
09/30/2026
$165.00
P
19260660
CRESCENT ELECTRIC SUPPLY CO
RB UPDATES - RECESSED LIGHTS
09/28/2026
$130.96
P
19260661
NEXTHOME PARTNERS
PROPERTY VALUATION
10/02/2026
$450.00
P
19260662
WE ENERGIES
GAS SERVICE JT USE BLDG-SEPT
10/06/2026
$10.89
P
19260663
WE ENERGIES
GAS SERVICE RIVER BLOCK - SEPT
10/02/2026
$534.11
P
19260664
WE ENERGIES
GAS SERVICE LEC - SEPT
10/02/2026
$2,440.16
P
19260665
WE ENERGIES
GAS SERVICE SHERIFF LOCKUP-SEP
10/06/2026
$10.89
P
19260666
WE ENERGIES
GAS SERVICE COURTHOUSE - SEPT
10/02/2026
$510.27
P
19260667
AMAZON CAPITAL SERVICES
JAIL KITCHEN SPRAYER VALVE
10/16/2026
$31.59
P
19260668
AMAZON CAPITAL SERVICES
OFFICE SUPPLIES
10/20/2026
$9.17
P
19260669
JF AHERN CO
RB BOILER PMA
10/12/2026
$542.50
P
19260670
JF AHERN CO
CH BOILER PMA
10/12/2026
$1,813.75
P
19260671
JF AHERN CO
RB HVAC INSPECTION
10/12/2026
$2,012.75
P
19260672
JF AHERN CO
CH HVAC INSPECTION
10/12/2026
$8,330.00
P
19260673
FIRE & SAFETY EQUIPMENT INC
SEMI ANNUAL FIRE SYSTEM SVC
10/13/2026
$436.85
P
19260674
FREEDOM PEST CONTROL LLC
RIVER BLOCK PEST CONTROL
10/19/2026
$42.00
P
19260675
FREEDOM PEST CONTROL LLC
COURTHOUSE PEST CONTROL
10/19/2026
$52.00
P
Committee Report
Report of claims for:
For the range of vouchers:
19260642 - 19260712
County of Wood
MAINTENANCE
For the period of:
OCTOBER 2026
Report Run: 10/28/2026 2:31:53 PM
Page 1 of 3
12
Committee Report - County of Wood
19260642 - 19260712
MAINTENANCE - OCTOBER 2026
Voucher
Vendor Name
Nature of Claim
Doc Date
Amount
Paid
19260676
HOME DEPOT CREDIT SERV (Maintenance)
RB SUPPLIES
10/05/2026
$29.94
P
19260677
SHERWIN-WILLIAMS CO THE
CH UPDATES - PAINT
10/14/2026
$286.51
P
19260678
WATER WORKS & LIGHTING COMMISSION
WATER/SEWER LEC
10/14/2026
$4,095.60
P
19260679
WATER WORKS & LIGHTING COMMISSION
ELECTRIC SERVICE LEC
10/14/2026
$14,690.30
P
19260680
WATER WORKS & LIGHTING COMMISSION
WATER/SEWER SERVICE COURTHOUSE
10/14/2026
$930.65
P
19260681
WATER WORKS & LIGHTING COMMISSION
ELEC SVC COURTHOUSE SECURITY
10/14/2026
$22.72
P
19260682
WATER WORKS & LIGHTING COMMISSION
ELECTRIC SERVICE BAKER LOT
10/14/2026
$35.25
P
19260683
WATER WORKS & LIGHTING COMMISSION
RB PARKING LOT STORM SEWER
10/14/2026
$51.38
P
19260684
WATER WORKS & LIGHTING COMMISSION
RIVER BLOCK STORM SEWER
10/14/2026
$59.80
P
19260685
WATER WORKS & LIGHTING COMMISSION
SARATOGA ST STORM SEWER
10/14/2026
$10.30
P
19260686
WATER WORKS & LIGHTING COMMISSION
COURTHOUSE STORM SEWER
10/14/2026
$126.47
P
19260687
WATER WORKS & LIGHTING COMMISSION
181 MARKET ST STORM SEWER
10/14/2026
$8.02
P
19260688
WATER WORKS & LIGHTING COMMISSION
COURTHOUSE ELECTRIC
10/14/2026
$11,398.66
P
19260689
WATER WORKS & LIGHTING COMMISSION
184 2ND ST N STORM SEWER
10/14/2026
$11.34
P
19260690
WATER WORKS & LIGHTING COMMISSION
180 2ND ST N STORM SEWER
10/14/2026
$14.65
P
19260691
WATER WORKS & LIGHTING COMMISSION
321 MARKET ST STORM SEWER
10/14/2026
$3.42
P
19260692
SUPERIOR CHEMICAL LLC
SHOP SUPPLIES
10/20/2026
$232.32
P
19260693
SUPERIOR CHEMICAL LLC
SUPPLIES & SALT
10/20/2026
$2,824.52
P
19260694
IMPERIAL DADE
CLEANING SUPPLIES
10/20/2026
$1,741.90
P
19260695
IMPERIAL DADE
SALT
10/20/2026
$1,076.04
P
19260696
US BANK
JAIL,TRACTOR,EMP REC,SOFTWARE
10/19/2026
$1,177.37
19260697
ADVANCE JANITORIAL/CLEAN POWER
CLEANING COURTHOUSE, JAIL
10/20/2026
$8,556.53
19260698
ADVANCE JANITORIAL/CLEAN POWER
CLEANING RIVER BLOCK
10/20/2026
$4,303.29
19260699
APPLIED INDUSTRIAL TECHNOLOGIES INC
RB BELTS
10/16/2026
$17.56
19260700
CONSTELLATION NEWENERGY-GAS DIVISION
CH, RB GAS SERVICE
10/19/2026
$1,143.83
19260701
CRESCENT ELECTRIC SUPPLY CO
RB LIGHTS
10/19/2026
$261.91
19260702
GAPPA SECURITY SOLUTIONS LLC
CH UPDATES - DEADBOLT
10/19/2026
$144.40
19260703
GRAINGER (Maintenance)
CH UPDATES - SUPPLIES
10/26/2026
$93.28
19260704
MENARDS - PLOVER
CH UPDATES - TRIM
10/19/2026
$119.98
19260705
SHERWIN-WILLIAMS CO THE
CH UPDATES - PAINT
10/20/2026
$368.20
19260706
SHRED SAFE 1 LLC
CONFIDENTIAL SHREDDING
10/20/2026
$210.00
19260707
ULINE
DIRECTIONAL SIGN FOR JAIL
10/20/2026
$206.34
19260708
NASSCO INC
SUPPLIES
10/27/2026
$83.84
19260709
ROTO GRAPHIC PRINTING INC
PRINTING-CJ
10/28/2026
$29.00
19260710
AMAZON CAPITAL SERVICES
DIRECTIONAL SIGN FOR JAIL
10/20/2026
$75.99
19260711
AMAZON CAPITAL SERVICES
CREDIT - JAIL DIRECTIONAL SIGN
10/27/2026
($75.99)
Grand Total:
$105,531.37
Report Run: 10/28/2026 2:31:53 PM
Page 2 of 3
13
Committee Report - County of Wood
19260642 - 19260712
MAINTENANCE - OCTOBER 2026
Committee Member:
Committee Member:
Committee Member:
Committee Chair:
Committee Member:
Signatures
Committee Member:
Committee Member:
Committee Member:
Committee Member:
Report Run: 10/28/2026 2:31:53 PM
Page 3 of 3
14
Wood County
WISCONSIN
400 Market Street • P.O. Box 8095 • Wisconsin Rapids, Wisconsin 54495-8095 • Telephone (715) 421-8404 • Facsimile (715) 421-8808
Reuben Van Tassel
Facilities Manager
Letter of Comments
November 2026
Ongoing Projects and Planning
Courthouse – Road construction near the courthouse is nearly complete; although there
have been many changes to traffic flow, vehicle access to the small ADA parking lot near
the main entrance and pedestrian access from the north (Baker St) parking lot to the main
entrance have remained open.
Design meetings for the future Market Street parking lot are ongoing; there are many
details to consider and City guidelines to follow as we develop documents for this
project.
Discussion with adjacent parcel owners regarding potential future acquisition will
continue if the County Board authorizes negotiations; I will continue working as directed
by the PIT Committee and report back as more information becomes available.
Jail Project – An alternate contractor is scheduled to begin assisting with our ongoing
security electronics integration problems.
Building automation system adjustments are ongoing.
River Block – Working to replace and update lighting in multiple areas of the building
and adjust light levels to better accommodate employees.
Reviewing adjustments to Human Services office space that will better accommodate
their needs.
Miscellaneous
Attended PIT, County Board, and numerous project meetings.
Participating in meetings and other project activities with the Laird Fine Arts Building
Renovation Advisory Committee.
Supporting Norwood and Edgewater with various project planning.
Working with the Sheriff’s Department on access to the new facility for other law
enforcement agencies within Wood County.
Working with HR to fill a vacant position due to a resignation.
15
RESOLUTION# DATE November 10, 2026
Effective
Date
Page 1 of 1
Introduced by Property & Information Technology Committee
Adopted by the County Board of Wood County, November 10, 2026
County Clerk County Board Chairman
INTENT & SYNOPSIS: To authorize staff to negotiate for the acquisition
of real property adjacent to property already owned by the County,
which property would improve the function of current or future
operations of the recently updated Courthouse campus. Final
approval of any negotiations would require a resolution passed by the
county board.
FISCAL NOTE: None; the authority being conveyed by the resolution is
limited to negotiations.
WHEREAS, there have been significant changes made to Courthouse
and Jail facilities recently that affect the functionality and operation of
our campus for both employees and visitors, and
WHEREAS, the services provided to the public warrant consideration
of additional changes that could improve the operation and efficiency
of departments located at the downtown Courthouse campus, and
WHEREAS, although there is not an immediate need to acquire
additional properties, there is a benefit to exploring options for future
use and strategic planning, and
WHEREAS, Wood County Board Rule 6.01(B) requires permission from
the county board to negotiate the acquisition of real property.
NOW THEREFORE BE IT RESOLVED, THE WOOD COUNTY BOARD
OF SUPERVISORS HEREBY RESOLVES to authorize the Facilities
Manager and other County staff under his direction to negotiate for the
acquisition of properties adjacent to County-owned parcels.
BE IT FURTHER RESOLVED that the authority conveyed here is only to negotiate and that the specific terms
regarding any acquisition shall require authorization by resolution of the Wood County Board.
Motion: Adopted:
1st Lost:
2nd Tabled:
No: Yes: Absent:
Number of votes required:
X Majority Two-thirds
Reviewed
by: NF , Corp Counsel
Reviewed
by: PY , Finance Dir.
NO YES A
1 Schulz, W
2 Rozar, D
3 Buttke, T
4 Perlock, R
5 Hovendick, T
6 Breu, A
7 Voight, W
8 Hahn, J
9 Goldberg, P
10 Thao, L
11 Penzkover, J
12 Valenstein, L
13 Casper, L
14 Polach, D
15 Clendenning, B
16 Pliml, L
17 Zurfluh, J
18 Hamilton, B
19 Leichtnam, B
16