RecordWell Data

Solid Waste Management Board — Agenda Packet

Town of Grant · Portage County · Solid Waste Management Board · meeting of Oct 27, 2026 · Agenda packets

Open the original document More from Town of Grant

This document is no longer listed on Town of Grant's website. We kept the copy we read.

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

PORTAGE COUNTY MEETING AGENDA SOLID WASTE MANAGEMENT BOARD PORTAGE COUNTY HWY CONFERENCE ROOM 800 PLOVER ROAD PLOVER, WI 54467 Tuesday, October 27, 2026 4:30 PM REMOTE ATTENDANCE & COMMENT To attend this meeting by telephone: dial 1-872-242-7813, after dialing the number you will then be asked to enter in a meeting number. Use the following meeting number: 638 955 759 then press #. To attend this meeting by video: https://teams.microsoft.com/meet/261216542257028?p=tc14RSXmi5u1IbWBMr Page 1 of 2 CALL TO ORDER Committee Members enter Per Diem and Mileage REPORTS 1. Special Meeting Attendance Reports (Portage County Ordinance 3.1.47 & 3.1.48) 2. Site Coordinator • Landfill Updates • Hazardous Waste Updates • Special Programs Updates 3. Solid Waste Director • SWAP Reconciliation Report • Recycling Processing Report • YTD Budget Report • Program Updates PUBLIC NOTICE Members of the public who wish to address the Committee on specific agenda items must register their request at this time, with such comments subject to the public comment ordinance and the reasonable control of the Committee Chair as set forth in Robert’s Rules of Order. APPROVAL OF MINUTES 4. August Meeting Minutes DISCUSSION/POSSIBLE ACTION 5. Discussion Only: Solid Waste Project Update NEXT MEETING DATE 6. Tuesday, November 24 at 4:30 pm Page 1 of 12 Solid Waste Management Board Meeting Agenda October 27, 2026 Page 2 of 2 ADJOURNMENT Notice: Any person who has special needs and plans on attending this meeting in-person or remotely should contact the Facilities at 715- 346-1598 as soon as possible to ensure that reasonable accommodations can be made. Notice: Remote comment by the public during the meeting will be at the discretion of the Chair. Notice: A quorum of the Portage County Board of Supervisors, or any committee thereof, may be present at this meeting. Page 2 of 12 2025 2026 LOADS TONS INCOME GENERATEDLOADS TONS INCOME GENERATED RESIDENTIAL 144 122.35 $9,788.00 438 207.04 $20,114.19 COMMERCIAL 240 858.16 $68,652.80 283 966.62 $80,813.34 DEMOLITION 655 826.15 $66,092.00 784 793.30 $67,376.21 MINIMUM CHARGE 432 59.93 $8,640.00 16 4.08 $320.00 MUNICIPAL 173 1,156.82 $80,977.40 185 1,201.91 $88,340.86 MISC. 631 0.00 $14,073.95 525 0.00 $11,341.00 TOTAL 2,275 3,023.41 $248,224.15 2,231 3,172.95 $268,305.60 2025 2026 CHANGE % CHANGE 2025 2026 CHANGE % CHANGE TOTAL LOADS 2,275 2,231 -44 -1.93% Total 146 152 6 4.11% YTD LOADS 16,538 18,327 1,789 10.82% YTD 1169 1293 124 10.61% TOTAL TONS 3,023.41 3,172.95 149.54 4.95% YTD TONS 24,001.08 25,871.01 1,869.93 7.79% TOTAL REVENUE $248,224.15 $268,305.60 $20,081.45 8.09% YTD REVENUE $1,970,362.89 $2,190,015.35 $219,652.46 11.15% LOADS TONS INCOME GENERATEDLOADS TONS INCOME GENERATED CHARGE 59 78.10 $7,236.95 84 131.52 $11,507.18 NO CHARGE 120 276.25 $0.00 140 337.65 $0.00 TOTAL 179 354.35 $7,236.95 224 469.17 $11,507.18 2025 2026 CHANGE % CHANGE 2025 2026 CHANGE % CHANGE YTD LOADS 1,781 1,978 197 11.06% Total 29 40 11 37.93% YTD TONS 3,260.60 3,764.61 504.01 15.46% YTD 276 346 70 25.36% YTD REVENUE* $54,254.03 $82,253.97 $27,999.94 51.61% *Tipping Fee Revenue (does not include the sale of recyclable material) INCOMING RECYCLABLE MATERIAL TOTALS COMPARISONOUTGOING LOADS OF RECYCLABLE MATERIAL SEPTEMBER MATERIAL VOLUME REPORT - 9/30/26 INCOMING TRANSFER FACILITY MATERIAL COMPARISON INCOMING TRANSFER FACILITY TOTALS COMPARISON OUTGOING TRANSFER FACILITY LOADS COMPARISON INCOMING RECYCLABLE MATERIAL COMPARISON 2025 2026 Page 3 of 12 Portage County Transfer Facility to Cranberry Creek WM Haul to Cranberry Creek Portage County Total to Cranberry Creek WM to Marathon County Monthly Variance (tons) Cumulative Variance (tons) Monthly Payment Due January 2,031.75 82.41 2,114.16 1,791.01 -323.15 -323.15 (12,764.43)$ February 1,917.43 55.85 1,973.28 1,609.83 -363.45 -686.60 (14,356.28)$ March 2,401.39 72.04 2,473.43 1,901.97 -571.46 -1,258.06 (22,572.67)$ 1st Quarter Total 6,350.57 210.30 6,560.87 5,302.81 (49,693.37)$ April 2,813.25 66.36 2,879.61 2,057.40 -822.21 -2,080.27 (32,477.30)$ May 2,878.83 68.28 2,947.11 2,014.91 -932.20 -3,012.47 (36,821.90)$ June 3,447.66 71.09 3,518.75 2,384.11-1,134.64 -4,147.11 (44,818.28)$ 2nd Quarter Total 9,139.74 205.73 9,345.47 6,456.42 (114,117.48)$ July 3,521.43 77.03 3,598.46 2,263.16-1,335.30 -5,482.41 (52,744.35)$ August 3,264.27 70.08 3,334.35 2,456.65 -877.70 -877.70 (34,669.15)$ September 3,119.08 67.32 3,186.40 2,319.51 -866.89 -866.89 (34,242.16)$ 3rd Quarter Total 9,904.78 214.43 10,119.21 7,039.32 (121,655.66)$ October 0.00 0.00 -866.89 -$ November 0.00 0.00 0.00 -$ December 0.00 0.00 0.00 -$ 4th Quarter Total 0.00 0.00 0.00 0.00 -$ Page 4 of 12 2026 Processing Fee or Rebate Incoming Residential Tons Incoming Business Tons Tons Processed at MRF Additional Fees Rebate or (Cost to Process) Number of Outbound Loads Cost to Haul Processing + Hauling Costs Monthly Average January (19.00)$ 305.04 83.28 395.80 -$ (7,520.20)$ 34 (25,249.42)$ (32,769.62)$ 18.49 February (19.00)$ 256.64 95.49 348.59 -$ (6,623.21)$ 33 (24,506.79)$ (31,130.00)$ 17.61 March (19.00)$ 287.66 104.31 376.10 -$ (7,145.90)$ 35 (25,992.05)$ (33,137.95)$ 17.82 April (16.00)$ 322.17 113.02 428.67 -$ (6,858.72)$ 39 (28,962.57)$ (35,821.29)$ 19.78 May (16.00)$ 313.69 101.68 398.90 -$ (6,382.40)$ 39 (28,962.57)$ (35,344.97)$ 18.88 June (16.00)$ 335.85 105.00 411.73 -$ (6,587.68)$ 41 (30,447.83)$ (37,035.51)$ 20.04 July (14.00)$ 347.04 97.07 433.90 (129.92)$ (6,457.76)$ 44 (32,675.72)$ (39,263.40)$ 20.19 August (14.00)$ 310.79 116.74 421.69 -$ (5,903.66)$ 40 (29,705.20)$ (35,608.86)$ 20.36 September (14.00)$ 337.65 131.53 455.78 (144.50)$ (6,380.92)$ 42 (31,190.46)$ (37,571.38)$ 22.34 October (13.00)$ -$ -$ -$ -$ November (13.00)$ -$ -$ -$ -$ December (13.00)$ -$ -$ -$ -$ Total 2,816.53 948.12 3,671.16 (274.42)$ (59,860.45)$ 347 (257,692.61)$ (317,682.98)$ Average (15.50)$ 312.95 105.35 407.91 (22.87)$ (4,988.37)$ 39 (21,474.38)$ (26,473.58)$ 19.50 July - Contamination Fee Sept. - higher tipping rate over 450 tons. Recycling Processing Report Page 5 of 12 2026 Budgeted 2026 Actual Percent Used Interest Income from LTC Account (77,241.00)$ (18,962.90)$ 24.6% LTC Account to Pay for Expenses (75,663.00)$ -$ 0.0% Fund Balance Applied (8,887.00)$ -$ 0.0% Investment Fees 2,701.00$ 2,127.98$ 78.8% Salaries/Wages 17,008.00$ 9,263.58$ 54.5% Benefits 6,241.00$ 1,659.90$ 26.6% Telephone/Computer Services 7,808.00$ 5,863.79$ 75.1% Mileage, Gas, & Rental 828.00$ 641.85$ 77.5% Leachate Hauling 14,805.00$ 6,832.50$ 46.1% Mi-Tech Services 8,000.00$ 5,626.19$ 70.3% Natural Gas 1,630.00$ 3,775.68$ 231.6% Electric 2,000.00$ 1,980.70$ 99.0% Repair & Maintenance Services 21,200.00$ 10,581.37$ 49.9% Jetting of Leachate Lines 5,250.00$ 4,500.00$ 85.7% Mowing of the Landfill 2,500.00$ 2.51$ 0.1% Water Testing Services 5,100.00$ 4,832.00$ 94.7% Snow Removal 3,500.00$ -$ 0.0% Disposing of Leachate at WWTP 1,700.00$ 578.73$ 34.0% License Fees 650.00$ -$ 0.0% Operating Materials 1,100.00$ 2,039.11$ 185.4% Property & Liability Insurance 7,069.00$ 4,999.43$ 70.7% Designated for Future Operations 52,701.00$ -$ 0.0% -$ 46,342.42$ As of September 30 Natural Gas: natural gas was prebought for the 2026/2027 winter season and was more than estimated during budgeting time last year; Operating Materials: a gas well needed to be replaced Landfill Budget Summary Page 6 of 12 2026 Budgeted 2026 Actual Percent Used State Grants - Hazardous Waste Grant (17,246.98)$ -$ 0.0% Federal Grant - HUD (1,910,400.00)$ (33,098.50)$ 1.7% Solid Waste Disposal Fees (2,630,416.00)$ (1,419,978.92)$ 54.0% Fund Balance Used (27,000.00)$ -$ 0.0% Other Miscellaneous Revenues (20,494.00)$ (15,939.68)$ 77.8% Uncollectible Accounts 750.00$ -$ 0.0% Salaries/Wages (Full-time) 95,666.50$ 65,057.71$ 68.0% Benefits 24,115.00$ 10,789.48$ 44.7% Telephone/Computer Services 9,106.00$ 6,569.93$ 72.1% Office Supplies & Equipment 2,700.00$ 2,183.33$ 80.9% Advertising/Photocopying/Postage 4,110.00$ 2,077.27$ 50.5% Membership & Association Dues 380.00$ 372.50$ 98.0% Conference & Trainings 1,500.00$ 975.00$ 65.0% Mileage/Meals/Gas/Rental/Lodging 1,079.00$ 1,025.89$ 95.1% Architectural/Engineering Services 52,300.00$ 47,784.41$ 91.4% Mykisen (TF Operations) 598,399.10$ 510,170.28$ 85.3% Water & Sewer 650.00$ 493.79$ 76.0% Natural Gas 8,500.00$ 4,178.68$ 49.2% Electric 15,500.00$ 7,320.70$ 47.2% Repair & Maintenance Services 119,500.00$ 8,370.59$ 7.0% Fire & Security Services 1,925.00$ 814.13$ 42.3% Mowing/Lawn care 5,000.00$ 4,210.71$ 84.2% Pest Control Services 2,600.00$ 2,413.71$ 92.8% Snow Removal 7,500.00$ 287.50$ 3.8% Waste Removal/Disposal 1,346,400.00$ 1,083,871.15$ 80.5% Merchant Services (Credit Card Fees) 12,500.00$ 9,773.22$ 78.2% License Fees 2,290.00$ 282.88$ 12.4% Operating Materials & Supplies 875.00$ 1,418.41$ 162.1% Property & Liability Insurance 15,810.00$ 12,087.82$ 76.5% Equipment Rental/Leases 1,794.00$ 1,077.89$ 60.1% Depreciation 34,193.00$ 20,996.99$ 61.4% Building & Land Improvements 1,455,400.00$ 22,913.70$ 1.6% Equipment 350,000.00$ -$ 0.0% Funds to be placed in the reserve 435,014.38$ 0.0% -$ 358,500.57$ Transfer Facility Budget Summary As of September 30 Architectural/Engineering Services: due to the length and complexity of the compactor procurement process, an engineering company was needed longer; Mykisen (TF Operations): due to fuel surcharges the cost for hauling trash has increased; Repair & Maintenance Services: the truck scale needed a few replacement parts (cost split with recycling); Waste Removal/Disposal: PCSW has experienced three of the busiest months on record for incoming trash, therefore disposal costs and hauling costs reflect the increase; Merchant Services: more and more people use credit cards to pay for services; Land Improvements: the recreation of the impound at HWY Page 7 of 12 2026 Budgeted 2026 Actual Percent Used State Grants - Recycling Grant (198,435.00)$ (197,768.59)$ 99.7% Federal Grants - HUD (1,814,800.00)$ (33,098.50)$ 1.8% Other Miscellaneous Revenues (4,818.00)$ (21,010.64)$ 436.1% Fund Balance Applied (614,915.40)$ -$ 0.0% Recycling Tipping Fees (60,000.00)$ (44,776.80)$ 74.6% Salaries/Wages 112,235.50$ 78,448.72$ 69.9% Benefits 30,347.00$ 13,315.68$ 43.9% Computer Services - County IT 7,784.00$ 5,856.03$ 75.2% Office Supplies 900.00$ 752.86$ 83.7% Advertising/Printing/Postage 2,916.00$ 1,375.55$ 47.2% Membership & Association Dues 380.00$ 245.00$ 64.5% Conferences & Trainings 1,500.00$ 800.00$ 53.3% Mileage/Meals/Rental/Gas/Lodging 1,079.00$ 505.98$ 46.9% Architectural/Engineering Services 50,000.00$ 48,150.30$ 96.3% MRF Processing Fees 188,000.00$ 59,531.26$ 31.7% Operation/Transportation Fees 312,472.90$ 263,131.26$ 84.2% Water & Sewer 900.00$ 683.71$ 76.0% Natural Gas 13,000.00$ 7,418.92$ 57.1% Electric 21,000.00$ 11,352.62$ 54.1% Repair & Maintenance Services 248,525.00$ 11,485.78$ 4.6% Fire & Security Services 2,425.00$ 1,088.15$ 44.9% Mowing/Lawn Care/Sprinklers 5,000.00$ 2,643.75$ 52.9% Pest Control 3,000.00$ 2,186.10$ 72.9% Snow Removal 7,500.00$ 287.50$ 3.8% Water Testing Services 700.00$ 645.00$ 92.1% License Fees 30.00$ -$ 0.0% Operating Materials & Supplies 2,250.00$ 3,653.11$ 162.4% Property & Liability Insurance 15,836.00$ 11,209.89$ 70.8% Equipment Rental/Leases 1,794.00$ 1,082.96$ 60.4% Depreciation 894.00$ 521.50$ 58.3% Building Improvements 1,312,500.00$ 4,901.00$ 0.4% Equipment 350,000.00$ -$ 0.0% Funds to be Placed in Reserves -$ -$ -$ 234,618.10$ Recycling Budget Summary As of September 30 Misc. Revenues: includes V. of Plover's 2025 recycling fee; Architectural/Engineering Services: due to the length and complexity of the compactor procurement process, an engineering company was needed longer; Operation/Transportation Fees: due to fuel surcharges the cost for hauling recycling has increased; Repair & Maintenance Services: the truck scale needed a few replacement parts (cost split with trash); Operating Materials & Supplies: a cart was purchased to aid in the event recycling bin loan program, replacement lids were also purchased Page 8 of 12 PORTAGE COUNTYMEETING MINUTESSOLID WASTE MANAGEMENT BOARDPORTAGE COUNTY ANNEX CONFERENCE ROOM 51462 STRONGS AVENUESTEVENS POINT, WI 54481Monday, August 24, 2026 4:30 PM REMOTE ATTENDANCE & COMMENTTo attend this meeting by telephone: dial 1-872-242-7813, after dialing the number you will then be asked to enter in a meeting number. Use the following meeting number: 153 402 338, then press #To attend this meeting by video: https://teams.microsoft.com/meet/282849553358527?p=us3w4A75g93BLPC0ql Page 1 of 2 CALL TO ORDERCommittee Members enter Per Diem and MileageThe Solid Waste Management Board meeting was called to order at 04:31 PMMembers Present:Attending In-Person: Bassett, Fritz, Wiza, WolfAttending Online: ZachMembers Excused: Randazzo, SchliceMembers Absent: GiffordStaff Attending: Haffele, Jossie (Finance Director)Others Attending: Pratt (T. of Amherst)REPORTS 1.Special Meeting Attendance Reports (Portage County Ordinance 3.1.47 & 3.1.48)2.Site CoordinatorLandfill UpdatesHazardous Waste UpdatesSpecial Program Updates3.Solid Waste DirectorSWAP Reconciliation ReportRecycling Processing ReportProgram UpdatesPUBLIC NOTICEMembers of the public who wish to address the Committee on specific agenda items must register their request at this time, with such comments subject to the public comment ordinance and the reasonable control of the Committee Chair as set forth in Robert’s Rules of Order.APPROVAL OF MINUTES 4.July Meeting Minutes Page 9 of 12 Solid Waste Management Board Meeting MinutesAugust 24, 2026 Page 2 of 2 A motion was made by Fritz, seconded by Bassett, to approve the July meeting minutes. Motion carried by voice vote, with no negative votes.DISCUSSION/POSSIBLE ACTION 5.Discussion and Possible Action: 2027 BudgetA motion was made by Fritz, seconded by Bassett, to recommend the 2027 draft budget as presented to the County Board Executive. Motion carried by voice vote, with no negative votes.NEXT MEETING DATE: September 22 at 4:30 pm ADJOURNMENT Meeting adjourned at 04:48 AM Page 10 of 12 Portage County Solid Waste Project Highlights Project Scope: The project is to optimize materials management in central Wisconsin. Portage County Solid Waste will accomplish the following tasks: 1. Reduce the financial burden of transferring solid waste and recyclable materials to a landfill and materials recovery facility. 2. Expand collection by improving, updating, and adding material management infrastructure. 3. Protect the current infrastructure from fire and daily use. Goals and Deliverables: There are three goals to the overall project. 1. Reduce hauling costs by compacting solid waste and recyclable materials. This will be done by purchasing two compactors to compact materials into trailers. A compaction trailer can hold up to 50% more material than an open top trailer therefore requiring less trips to a landfill or a recycling facility. 2. Increase processing capacity of solid waste and recyclable materials. The County plans to add a compactor bay to the Transfer Facility, which will reorganize the building's working area. 3. Protect the current infrastructure from years of use and potential fire by adding protective measures and updating mitigation techniques. This includes removing built up dust and debris, installing new ceiling tiles after removal of dust and debris, installing fire suppression systems, updating the current tipping floor in the recycling facility, and adding a push wall to the recycling facility. Details Dorschner Associates is serving as the project designer and Findorff is acting as the Construction Manager at Risk. The compactors were procured through Ace Equipment. Transfer Facility 1. The building addition will be located on the west side of the Transfer Facility and will be approximately 1500 sq ft. This space will house the compactor. a. The facade will match the existing building. 2. A fire protection mechanical room will be constructed on the east side of the building, totaling approximately 97 sq. ft. Fire suppression nozzles will be placed throughout the entire Transfer Facility including the addition. 3. An updated air handling system will be installed to reduce dust and increase air quality inside the building. Page 11 of 12 Recycling Facility 1. The fire protection mechanical room will be located on the inside of the former processing room. It will be sized to support fire suppression requirements for the entire building; however, through this project, nozzles will only be installed on the tipping floor. a. Water lines will be routed from the Transfer Facility to the Recycling Facility to accommodate the needs of the fire suppression system. 2. A portion of the tipping room floor in the Recycling Facility will be replaced. 3. A push wall will be installed on the north wall and a portion of the east wall within the active tipping area of the Recycling Facility. 4. A compactor will be installed on the east side of the building’s tipping floor area. Both Buildings 1. Once the major portion of the project is completed, buildings will be cleaned by an industrial cleaning company to remove the built up dust and debris, reducing fire risk and increasing air quality. a. Ceiling tiles will be replaced with new. 2. Lighting upgrades may be implemented pending program eligibility and potential rebate opportunities through Focus on Energy. Timeline Final designs to be given to Portage County in late 2026 with hopes to break ground in spring of 2027. Page 12 of 12

Source: Town of Grant website. First collected Oct 30, 2026.