Airport Commission — Agenda Packet
City of Stevens Point · Portage County · Airport Commission · meeting of Feb 9, 2026 · Agenda packets
Open the original document More from City of Stevens Point
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Our intention is to have in-person meetings going forward. Meetings will be held at 300 Bliss Avenue. This in-
person location will meet the legal requirement for our open meetings. We will have a virtual option available,
but technology for the hybrid style meeting may not be reliable.
City of Stevens Point
Airport Commission
February 9, 2026 - 12:30 PM
Stevens Point Public Utilities
300 Bliss Avenue, Stevens Point, WI
OR
Zoom Teleconferencing
Meeting ID: 820 26885705
By Computer: https://us02web.zoom.us/j/82026885705
By Phone: (303) 715-8592
(or immediately following previously scheduled meeting)
AGENDA
Discussion and Possible Action on:
1. Roll Call.
2. Approval of Minutes
3. Capital Operations and Maintenance Plan - Joel Lemke
4. Approval of Department Claims
5. Written/Verbal Report - Jason Draheim
6. Adjournment.
The next Airport Commission meeting will be Monday, March 9, 2026 immediately
following the Board of Water & Sewerage Commission Meeting.
Any person who has special needs while attending this meeting or needing agenda materials
for this meeting should contact the Director as soon as possible to ensure a reasonable
accommodation can be made. The Director can be reached by telephone at (715) 345-5260,
or by mail at 300 Bliss Avenue, P.O. Box 243 Stevens Point, WI.
Copies of resolutions, reports and minutes of the Airport Commission Meetings are on file at the
Administrative Office of the Water and Sewage Departments for inspection during normal
business hours from 7:30 A.M. to 4:00 P.M.
Page 1 of 10
City of Stevens Point
Airport Commission
January 12, 2026 - 12:40 PM
Stevens Point Public Utilities
300 Bliss Avenue, Stevens Point, WI
OR
Zoom Teleconferencing
Meeting ID: 820 26885705
By Computer: https://us02web.zoom.us/j/82026885705
By Phone: (303) 715-8592
MINUTES
Discussion and Possible Action on:
1. Roll Call.
PRESENT: Paul Adamski, Carl Rasmussen, Anna Haines, Ray Schmidt and Jeff
Bushman
ALSO PRESENT: Joel Lemke, Jennifer Schmeiser, Eric Southworth, Shane Kohnen,
Jason Draheim, Jaime Zdroik, Ald. Lang and Ald. Shuda
2. Approval of Minutes
Motion made by Carl Rasmussen, seconded by Anna Haines to approve the
December 8, 2025, meeting minutes of the Airport Commission.
Ayes all. Nays none. Motion carried.
3. Approval of Department Claims
Motion made by Ray Schmidt, seconded by Jeff Bushman to approve the department's
claims for the month of December 2025 as audited and read.
Ayes all. Nays none. Motion carried.
4. Written/Verbal Report - Jason Draheim
Jason stated there is a survey taking place today on the airfield for the taxiway lighting
project to be completed this week. Shane's crew is currently working on changing out
the broom on the MB5 snow removal machine.
5. Adjournment.
Motion made by Ray Schmidt to adjourn the meeting.
Ayes all. Nays none. Motion carried.
Meeting Adjourned: 12:42 P.M.
Page 2 of 10
Page 3 of 10
Public Utilities and Municipal Airport
Capital Operations and Maintenance Plan
2026 Requests and future year plans
* indicateds replacement fund elligibility
Water Requests Dept. Share Other Sources Notes Year
Reconstruction B‐51 N 1,375,000 2 year project from Briggs to Northpoint Dr 2026
Reconstruction B‐51 S 800,000 South city limits to Michigan Ave 2026
Reconstruction Michigan Ave Underpass 440,000 Patch St to Dixon St 2026
Purchase of power generation assets 1,250,000 1,250,000 1/2 Split with Wastewater 2026
Design of pressure zone 2 (Tower 3, 3 pump stations) 495,000 2026
Remaing design and construction of well 12 2,600,000 2026
50% of SCADA upgrade (carry‐over item) 76,000 76,000 Continued from 2025 2026
Replace Office Vehicle #11 with electric vehicle 55,000 2026
Bulk water fill station replacement panel 15,000 2026
Current Year Request Total 7,106,000 1,326,000
Future Year Capital Projects:
Repaint towers 1 and 2 2027
33% of new cold storage facility 250,000 750,000 Shared with Wastewater and Stormwater 2028
Design/Build EV Charing @ Constr. Garage TBD 2028
Replace (4) Water Service Trucks TBD Electric Vehicles 2028
33% of Administration building addition 400,000 1,200,000 Shared with Wastewater and Stormwater 2029
Replace Tractor Backhoe #8 175,000??? 2029
Tower 3 and pump station construction ‐ zone 2 7,500,000 Third tower will go on second pressure zone 2030
Wellfield treatment plant TBD Potential treatment for wells 6,7,8,9,10 2032
Wastewater Requests Dept. Share Other Sources Notes Year
Reconstruction B‐51 N 1,265,000 2 year project from Briggs to Northpoint Dr 2026
Reconstruction B‐51 S 736,000 South city limits to Michigan Ave 2026
Reconstruction Michigan Ave Underpass 405,000 Patch St to Dixon St 2026
Purchase of power generation assets 1,250,000 1,250,000 1/2 Split with Water 2026
Feltz/10‐51 lift station replacement 1,993,000 Engineering complete, project awarded, work in 2026 2026
*UV disinfection and final clarifier upgrades UV Complete, Clarifier work in 2026, total contract 619K 2026
Replace windows in lab office building 8,000 2026
50% of SCADA upgrade 76,000 76,000 Continued from 2025 2026
Replace 3/4 Ton Truck #22 with plow 65,000 WWTP Plow Truck 2026
Page 4 of 10
Replace 3/4 Ton Truck #32 with plow 65,000 Const. Garage Plow Truck 2026
Replace 3/4 Ton Truck #4 with Utility Box 75,000 Collections Service Truck 2026
Envirosight Televising Carriage 25,000 Need large diameter sewer pipe capabilities 2026
*Digester 3 cover coating TBD Inside of cover is corroding, needs inspecting 2026
*Remainder of Influent Pump Rehab/Replacement 1,010,000 Retrun of screw 1, work on screw 2 (210,000 of 1,220,000 done) 2026
*Primary Sludge Pump Replacement 100,000 2026
Remainder of security gates/fencing/access control 15,000 New fence and gates were installed. Working on access control 2026
Current Year Request Total 7,088,000 1,326,000
Future Year Capital Projects:
Solids building back up generator 250,000 2027
* Aeration upgrade/gate replacement 5,000,000 Selector Basin and Aeration Upgrade 2029
Solar Panel install 280,000 Install along back fence 200KW 2027
*Grit System Rehab 40,000 Gear box/Motor replacement 2027
Replace 3/4 Ton Truck 60,000 Lift Station Truck 2027
Replace Collections Flush Truck #BD 80,000 Estimate 2027
33% of new cold storage facility 250,000 750,000 Shared with Water and Stormwater 2028
Grease receiving equipment 2,500,000 Screening/Seperation 2030
*Automatic Sampler Replacements 50,000 Raw, Primary, Effluent 2028
33% of Administration building addition 400,000 1,200,000 Shared with Water and Stormwater 2029
*Rotary Seals for Biosolids Dryer 65,000 2029
Replace Vactor Truck 500,000 Estimate 2029
*Aeration Blower Replacement 200,000 Replace Blower #3 2031
Stormwater Requests Dept. Share Other Sources Notes Year
Reconstruction B‐51 N 1,210,000 2 year project from Briggs to Northpoint Dr 2026
Reconstruction B‐51 S 704,000 South city limits to Michigan Ave 2026
Reconstruction Michigan Ave Underpass 387,000 Patch St to Dixon St 2026
PDFR Grant 75,000 Previously approved 2026
Current Year Request Total 2,376,000 0
Future Year Capital Projects:
33% of new cold storage facility 250,000 750,000 Shared with Water and Wastewater 2028
33% of Administration building addition 400,000 1,200,000 Shared with Water and Wastewater 2029
Treatment facility Near I‐39 and Maple Bluff Road 2031
Fiber Requests Dept. Share Other Sources Notes Year
No current CIP requests
Current Year Request Total 0 0
Airport Requests Dept. Share Other Sources Notes Year
Planning ‐ New Airport Master Plan 472,000 11,800 approved trough City CIP 2026
Page 5 of 10
Design ‐ 12/30 Runway Rehab 200,000 10,000 approved through City CIP 2026
Design ‐ 12/30 Lighting Reconstruction 60,000 3,000 approved through City CIP 2026
Design ‐ Runway Signage Replacement 5,000 250 approved through City CIP 2026
Design ‐ Taxiway A Lighting Reconstruction 120,000 6,000 approved through City CIP 2026
Design ‐ Taxiway B Lighting Reconstruction 40,000 2,000 approved through City CIP 2026
Mowing Implement 33,000 Approved through 2025 City CIP ‐ Encumbered 2026
Current Year Request Total 0 930,000
Future Year Capital Projects:
Construction ‐ Taxiway A Lighting 37,500 750,000 BIL, State, Apportionment, Entitlement, Discretionary 2027
Construction ‐ Taxiway B Lighting 7,895 315,789 BIL, State, Apportionment, Entitlement, Discretionary 2027
Construction ‐ Runway 12/30 Rehabilitation 100,000 2,000,000 BIL, State, Apportionment, Entitlement, Discretionary 2028
Construction ‐ Runway 12/30 Lighting Reconstruction 30,000 600,000 BIL, State, Apportionment, Entitlement, Discretionary 2028
Construction ‐ Replace Runway Signage 1,000 20,000 BIL, State, Apportionment, Entitlement, Discretionary 2028
Design ‐ Construction of Taxilane 10,000 200,000 BIL, State, Apportionment, Entitlement, Discretionary 2029
Construction ‐ Taxilane Construction 50,000 1,000,000 BIL, State, Apportionment, Entitlement, Discretionary 2030
Loader replacement TBD TBD Future City CIP request and replacement TBD
Turf Runway 45,000 TBD
Future ‐ Hangar improvements, suitable for lease TBD TBD TBD
Page 6 of 10
FINANCES:
Bank balance as of January 1, 2026 117,017.99$
Bank deposits recorded in January 2026 7,852.06$
124,870.05$
CHECKS ISSUED IN JANUARY 2026
3129 Advanced Physical Therapy 2025 Audiograms 32.00
3130 Baker Tilly Virchow Krause LLP 2025 Transit 56.96
3131 Employee Resource Center Monthly EAP Fees 5.98
3132 Abel Ruga December cleaning services 175.00
3133 Securian Financial MN Life Insurance Policy #002832L 16.00
3134 LiveWire Systems LLC Installing cameras 2,030.00
3135 Stevens Point Public Utilities Verizon IPad charges 11-24-25-12/23/25 10.13
3136 City of Stevens Point Insurance, retirement, FMLA Source, fuel 11,377.02
3137 City of Stevens Point IT Invoices 207.06
3138 M-B Companies, Inc. MB5 Plow Blade 5,753.60
3139 Per Mar Security Services Gates 2A & 2B Repair 5,169.76
3140 Mastercard Internet & Rugs 444.33
3141 Mastercard Supplies 91.66
3142 Heartland Business Systems, LLC Monthly billing for January 71.03
EFT Payroll January 2026 9,641.39
Delta Dental Premium Charges 71.38
Wisconsin Public Service Utility Charges 5,145.07
IRS & WI Dept of Revenue Payroll Taxes 5,888.87
Gen Aviation Gen Aviation 95.52
TOTAL EXPENSES LISTED $ 46,282.76 46,282.76$
78,587.29$
Balance on Hand 78,587.29$
Plus checks written after end of month -$
Plus uncleared checks 607.02$
Less checks previously written clearing this month (1,300.91)$
Ending Cash Balance matching Bank Statements 77,893.40$
REPORT TO THE FEBRUARY
MEETING OF THE AIRPORT COMMISSION
BALANCE ON HAND JANUARY 31, 2026
Page 7 of 10
Stevens Point Municipal Airport
Manager’s Report Page | 1
January 2026
Airport Activity
• Next gen obstruction removal (tree clearing) in progress within the approach surfaces to
runways 12 and 30.
• Taxiway lighting project design in progress
• Legacy crosswind runway designation pending.
• Master plan project in progress.
Previous Yr. / Present Yr. aircraft movements recorded during business
hours.
2025 AC
Movement
Cumulative
Movements 2026 AC
Movement
Cumulative
Movements
January 201 201 January 150 150
February 152 353 February
March 201 554 March
April 220 774 April
May 388 1162 May
June 427 1589 June
July 680 2269 July
August 575 2844 August
September 592 3436 September
October 551 3987 October
November 385 4372 November
December 204 4576 December
Total 4576 Total 150
Average 381 Average 150
High Mo. 680 High Mo. 150
Low Mo. 152 Low Mo. 150
Page 8 of 10
Stevens Point Municipal Airport
Manager’s Report Page | 2
Previous Yr. / Present Yr. fuel sale comparison by month. All quantities are
U.S. Gallons.
2025 100LL Jet-A 2026 100LL Jet-A
January 433.58 1679.8 January 636.75 709.4
February 318.1 817 February
March 561.4 1156.4 March
April 1222.73 1346.2 April
May 2009.14 3566.4 May
June 1540.96 2472.4 June
July 2374.84 3299.3 July
August 1336.9 2509.9 August
September 1270.83 1459.7 September
October 1262.56 3518.2 October
November 1147.79 1449 November
December 866.97 725 December
Total 14345.8 23999.3 Total 636.75 709.4
Average 1195.48 1999.942 Average 636.75 709.4
High Mo. 2374.84 3566.4 High Mo. 636.75 709.4
Low Mo. 318.1 725 Low Mo. 636.75 709.4
Hangar Rentals/Availability
• Airport Hangars are currently occupied at full capacity. There are currently 22
Individuals interested in basing aircraft at Stevens Point Municipal should space become
available.
Aircraft Rentals/Instruction Given
N/A
Airport Maintenance/Projects (Proposed/Completed)
• Fuel System filter changes and meter calibration current.
• Vehicular tank meter(VTM) licenses current..
This report was completed by Jason Draheim. Questions concerning the report or any other
related issues can be answered by contacting Jason Draheim by telephone at 715.345.8993, or by
e-mail, jdraheim@stevenspoint.com.
Page 9 of 10
Month-End Fuel Report
To: Airport Commission
From: Jason Draheim, Airport Manager
(neg difference = fuel gained)
Month: January Year: 2026 (pos difference = fuel missing)
100LL Gal. Jet-A Gal. Total Gal. Invoiced Gallons Received
Prev. Month Jet-A Truck Quantity N/A 2131 N/A
Prev. Month Qty 8828 4414 15373
(veeder-root)
Purchases ( + ) 0 0
Sold ( - ) 636.75 709.4 1346.15
Used ( - ) 20 20 160
Total Qty ( = ) 8171.25 5815.6 13866.85
Month End Jet-A Truck Quantity N/A 1572 N/A
Month End Qty ( - ) 8136 4248 13956
(veeter-root)
Difference ( = ) 35.25 -4.4 30.85
100LL Gal. Jet-A Gal.
Tax exempt Gal. 0 0
(includes used gals)
Veeter-Root & Pump Readings
100LL Gal. Jet-A Gal.
This month end inches: 89.58 52.1
This month end temp: 7.8 8.4
This month end meter: 8136 4248 (tanks only)
Prev month end inches: 91.28 53.66
Prev month end temp: 16.7 16.5
Prev month end meter: 8828 4414 (tanks only)
Price per gal: 5.25 5.2
Inventor gals: 8136 4248
Inventory Value: 42,714.00$ 22,089.60$
Total Inventory Value: 64,803.60$
Page 10 of 10
Source: City of Stevens Point website. First collected Oct 30, 2026.