RecordWell Data

Airport Commission — Agenda Packet

City of Stevens Point · Portage County · Airport Commission · meeting of Feb 9, 2026 · Agenda packets

Open the original document More from City of Stevens Point

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Our intention is to have in-person meetings going forward. Meetings will be held at 300 Bliss Avenue. This in- person location will meet the legal requirement for our open meetings. We will have a virtual option available, but technology for the hybrid style meeting may not be reliable. City of Stevens Point Airport Commission February 9, 2026 - 12:30 PM Stevens Point Public Utilities 300 Bliss Avenue, Stevens Point, WI OR Zoom Teleconferencing Meeting ID: 820 26885705 By Computer: https://us02web.zoom.us/j/82026885705 By Phone: (303) 715-8592 (or immediately following previously scheduled meeting) AGENDA Discussion and Possible Action on: 1. Roll Call. 2. Approval of Minutes 3. Capital Operations and Maintenance Plan - Joel Lemke 4. Approval of Department Claims 5. Written/Verbal Report - Jason Draheim 6. Adjournment. The next Airport Commission meeting will be Monday, March 9, 2026 immediately following the Board of Water & Sewerage Commission Meeting. Any person who has special needs while attending this meeting or needing agenda materials for this meeting should contact the Director as soon as possible to ensure a reasonable accommodation can be made. The Director can be reached by telephone at (715) 345-5260, or by mail at 300 Bliss Avenue, P.O. Box 243 Stevens Point, WI. Copies of resolutions, reports and minutes of the Airport Commission Meetings are on file at the Administrative Office of the Water and Sewage Departments for inspection during normal business hours from 7:30 A.M. to 4:00 P.M. Page 1 of 10 City of Stevens Point Airport Commission January 12, 2026 - 12:40 PM Stevens Point Public Utilities 300 Bliss Avenue, Stevens Point, WI OR Zoom Teleconferencing Meeting ID: 820 26885705 By Computer: https://us02web.zoom.us/j/82026885705 By Phone: (303) 715-8592 MINUTES Discussion and Possible Action on: 1. Roll Call. PRESENT: Paul Adamski, Carl Rasmussen, Anna Haines, Ray Schmidt and Jeff Bushman ALSO PRESENT: Joel Lemke, Jennifer Schmeiser, Eric Southworth, Shane Kohnen, Jason Draheim, Jaime Zdroik, Ald. Lang and Ald. Shuda 2. Approval of Minutes Motion made by Carl Rasmussen, seconded by Anna Haines to approve the December 8, 2025, meeting minutes of the Airport Commission. Ayes all. Nays none. Motion carried. 3. Approval of Department Claims Motion made by Ray Schmidt, seconded by Jeff Bushman to approve the department's claims for the month of December 2025 as audited and read. Ayes all. Nays none. Motion carried. 4. Written/Verbal Report - Jason Draheim Jason stated there is a survey taking place today on the airfield for the taxiway lighting project to be completed this week. Shane's crew is currently working on changing out the broom on the MB5 snow removal machine. 5. Adjournment. Motion made by Ray Schmidt to adjourn the meeting. Ayes all. Nays none. Motion carried. Meeting Adjourned: 12:42 P.M. Page 2 of 10 Page 3 of 10 Public Utilities and Municipal Airport Capital Operations and Maintenance Plan 2026 Requests and future year plans * indicateds replacement fund elligibility Water Requests Dept.  Share Other  Sources Notes Year Reconstruction B‐51 N 1,375,000 2  year project from Briggs to Northpoint Dr 2026 Reconstruction B‐51 S 800,000 South  city limits to Michigan Ave 2026 Reconstruction Michigan Ave Underpass 440,000 Patch  St to Dixon St 2026 Purchase of power generation assets 1,250,000 1,250,000 1/2  Split with Wastewater 2026 Design of pressure zone 2 (Tower 3, 3 pump stations) 495,000 2026 Remaing design and construction of well 12 2,600,000 2026 50% of SCADA upgrade (carry‐over item) 76,000 76,000 Continued  from 2025 2026 Replace Office Vehicle #11 with electric vehicle 55,000 2026 Bulk water fill station replacement panel 15,000 2026 Current Year Request Total 7,106,000 1,326,000 Future Year Capital Projects: Repaint towers 1 and 2 2027 33% of new cold storage facility 250,000 750,000 Shared  with Wastewater and Stormwater 2028 Design/Build EV Charing @ Constr. Garage TBD 2028 Replace (4) Water Service Trucks TBD Electric  Vehicles 2028 33% of Administration building addition 400,000 1,200,000 Shared  with Wastewater and Stormwater 2029 Replace Tractor Backhoe #8 175,000??? 2029 Tower 3 and pump station construction ‐ zone 2 7,500,000 Third  tower will go on second pressure zone 2030 Wellfield treatment plant TBD Potential  treatment for wells 6,7,8,9,10 2032 Wastewater Requests Dept.  Share Other  Sources Notes Year Reconstruction B‐51 N 1,265,000 2  year project from Briggs to Northpoint Dr 2026 Reconstruction B‐51 S 736,000 South  city limits to Michigan Ave 2026 Reconstruction Michigan Ave Underpass 405,000 Patch  St to Dixon St 2026 Purchase of power generation assets 1,250,000 1,250,000 1/2  Split with Water 2026 Feltz/10‐51 lift station replacement  1,993,000 Engineering  complete, project awarded, work in 2026 2026 *UV disinfection and final clarifier upgrades UV  Complete, Clarifier work in 2026, total contract 619K 2026 Replace windows in lab office building 8,000 2026 50% of SCADA upgrade 76,000 76,000 Continued  from 2025 2026 Replace 3/4 Ton Truck #22 with plow 65,000 WWTP  Plow Truck 2026 Page 4 of 10 Replace 3/4 Ton Truck #32 with plow 65,000 Const.  Garage Plow Truck 2026 Replace 3/4 Ton Truck #4 with Utility Box 75,000 Collections  Service Truck 2026 Envirosight Televising Carriage 25,000 Need  large diameter sewer pipe capabilities 2026 *Digester 3 cover coating TBD Inside  of cover is corroding, needs inspecting 2026 *Remainder of Influent Pump Rehab/Replacement 1,010,000 Retrun  of screw 1, work on screw 2 (210,000 of 1,220,000 done) 2026 *Primary Sludge Pump Replacement 100,000 2026 Remainder of security gates/fencing/access control 15,000 New  fence and gates were installed.  Working on access control 2026 Current Year Request Total 7,088,000 1,326,000 Future Year Capital Projects: Solids building back up generator 250,000 2027 * Aeration upgrade/gate replacement 5,000,000 Selector  Basin and Aeration Upgrade 2029 Solar Panel install 280,000 Install  along back fence 200KW 2027 *Grit System Rehab 40,000 Gear  box/Motor replacement 2027 Replace 3/4 Ton Truck 60,000 Lift  Station Truck 2027 Replace Collections Flush Truck #BD 80,000 Estimate 2027 33% of new cold storage facility 250,000 750,000 Shared  with Water and Stormwater 2028 Grease receiving equipment 2,500,000 Screening/Seperation 2030 *Automatic Sampler Replacements 50,000 Raw,  Primary, Effluent 2028 33% of Administration building addition 400,000 1,200,000 Shared  with Water and Stormwater 2029 *Rotary Seals for Biosolids Dryer 65,000 2029 Replace Vactor Truck 500,000 Estimate 2029 *Aeration Blower Replacement 200,000 Replace  Blower #3 2031 Stormwater Requests Dept.  Share Other  Sources Notes Year Reconstruction B‐51 N 1,210,000 2  year project from Briggs to Northpoint Dr 2026 Reconstruction B‐51 S 704,000 South  city limits to Michigan Ave 2026 Reconstruction Michigan Ave Underpass 387,000 Patch  St to Dixon St 2026 PDFR Grant 75,000 Previously  approved 2026 Current Year Request Total 2,376,000 0 Future Year Capital Projects: 33% of new cold storage facility 250,000 750,000 Shared  with Water and Wastewater 2028 33% of Administration building addition 400,000 1,200,000 Shared  with Water and Wastewater 2029 Treatment facility Near  I‐39 and Maple Bluff Road 2031 Fiber Requests Dept.  Share Other  Sources Notes Year No current CIP requests Current Year Request Total 0 0 Airport Requests Dept.  Share Other  Sources Notes Year Planning ‐ New Airport Master Plan 472,000 11,800  approved trough City CIP 2026 Page 5 of 10 Design ‐ 12/30 Runway Rehab 200,000 10,000  approved through City CIP 2026 Design ‐ 12/30 Lighting Reconstruction 60,000 3,000  approved through City CIP 2026 Design ‐ Runway Signage Replacement 5,000 250  approved through City CIP 2026 Design ‐ Taxiway A Lighting Reconstruction 120,000 6,000  approved through City CIP 2026 Design ‐ Taxiway B Lighting Reconstruction  40,000 2,000  approved through City CIP 2026 Mowing Implement 33,000 Approved  through 2025 City CIP ‐ Encumbered 2026 Current Year Request Total 0 930,000 Future Year Capital Projects: Construction ‐ Taxiway A Lighting 37,500 750,000 BIL,  State, Apportionment, Entitlement, Discretionary 2027 Construction ‐ Taxiway B Lighting 7,895 315,789 BIL,  State, Apportionment, Entitlement, Discretionary 2027 Construction ‐ Runway 12/30 Rehabilitation 100,000 2,000,000 BIL,  State, Apportionment, Entitlement, Discretionary 2028 Construction ‐ Runway 12/30 Lighting Reconstruction 30,000 600,000 BIL,  State, Apportionment, Entitlement, Discretionary 2028 Construction ‐ Replace Runway Signage 1,000 20,000 BIL,  State, Apportionment, Entitlement, Discretionary 2028 Design ‐ Construction of Taxilane 10,000 200,000 BIL,  State, Apportionment, Entitlement, Discretionary 2029 Construction ‐ Taxilane Construction 50,000 1,000,000 BIL,  State, Apportionment, Entitlement, Discretionary 2030 Loader replacement TBD TBD Future  City CIP request and replacement TBD Turf Runway 45,000 TBD Future ‐ Hangar improvements, suitable for lease TBD TBD TBD Page 6 of 10 FINANCES: Bank balance as of January 1, 2026 117,017.99$ Bank deposits recorded in January 2026 7,852.06$ 124,870.05$ CHECKS ISSUED IN JANUARY 2026 3129 Advanced Physical Therapy 2025 Audiograms 32.00 3130 Baker Tilly Virchow Krause LLP 2025 Transit 56.96 3131 Employee Resource Center Monthly EAP Fees 5.98 3132 Abel Ruga December cleaning services 175.00 3133 Securian Financial MN Life Insurance Policy #002832L 16.00 3134 LiveWire Systems LLC Installing cameras 2,030.00 3135 Stevens Point Public Utilities Verizon IPad charges 11-24-25-12/23/25 10.13 3136 City of Stevens Point Insurance, retirement, FMLA Source, fuel 11,377.02 3137 City of Stevens Point IT Invoices 207.06 3138 M-B Companies, Inc. MB5 Plow Blade 5,753.60 3139 Per Mar Security Services Gates 2A & 2B Repair 5,169.76 3140 Mastercard Internet & Rugs 444.33 3141 Mastercard Supplies 91.66 3142 Heartland Business Systems, LLC Monthly billing for January 71.03 EFT Payroll January 2026 9,641.39 Delta Dental Premium Charges 71.38 Wisconsin Public Service Utility Charges 5,145.07 IRS & WI Dept of Revenue Payroll Taxes 5,888.87 Gen Aviation Gen Aviation 95.52 TOTAL EXPENSES LISTED $ 46,282.76 46,282.76$ 78,587.29$ Balance on Hand 78,587.29$ Plus checks written after end of month -$ Plus uncleared checks 607.02$ Less checks previously written clearing this month (1,300.91)$ Ending Cash Balance matching Bank Statements 77,893.40$ REPORT TO THE FEBRUARY MEETING OF THE AIRPORT COMMISSION BALANCE ON HAND JANUARY 31, 2026 Page 7 of 10 Stevens Point Municipal Airport Manager’s Report Page | 1 January 2026 Airport Activity • Next gen obstruction removal (tree clearing) in progress within the approach surfaces to runways 12 and 30. • Taxiway lighting project design in progress • Legacy crosswind runway designation pending. • Master plan project in progress. Previous Yr. / Present Yr. aircraft movements recorded during business hours. 2025 AC Movement Cumulative Movements 2026 AC Movement Cumulative Movements January 201 201 January 150 150 February 152 353 February March 201 554 March April 220 774 April May 388 1162 May June 427 1589 June July 680 2269 July August 575 2844 August September 592 3436 September October 551 3987 October November 385 4372 November December 204 4576 December Total 4576 Total 150 Average 381 Average 150 High Mo. 680 High Mo. 150 Low Mo. 152 Low Mo. 150 Page 8 of 10 Stevens Point Municipal Airport Manager’s Report Page | 2 Previous Yr. / Present Yr. fuel sale comparison by month. All quantities are U.S. Gallons. 2025 100LL Jet-A 2026 100LL Jet-A January 433.58 1679.8 January 636.75 709.4 February 318.1 817 February March 561.4 1156.4 March April 1222.73 1346.2 April May 2009.14 3566.4 May June 1540.96 2472.4 June July 2374.84 3299.3 July August 1336.9 2509.9 August September 1270.83 1459.7 September October 1262.56 3518.2 October November 1147.79 1449 November December 866.97 725 December Total 14345.8 23999.3 Total 636.75 709.4 Average 1195.48 1999.942 Average 636.75 709.4 High Mo. 2374.84 3566.4 High Mo. 636.75 709.4 Low Mo. 318.1 725 Low Mo. 636.75 709.4 Hangar Rentals/Availability • Airport Hangars are currently occupied at full capacity. There are currently 22 Individuals interested in basing aircraft at Stevens Point Municipal should space become available. Aircraft Rentals/Instruction Given N/A Airport Maintenance/Projects (Proposed/Completed) • Fuel System filter changes and meter calibration current. • Vehicular tank meter(VTM) licenses current.. This report was completed by Jason Draheim. Questions concerning the report or any other related issues can be answered by contacting Jason Draheim by telephone at 715.345.8993, or by e-mail, jdraheim@stevenspoint.com. Page 9 of 10 Month-End Fuel Report To: Airport Commission From: Jason Draheim, Airport Manager (neg difference = fuel gained) Month: January Year: 2026 (pos difference = fuel missing) 100LL Gal. Jet-A Gal. Total Gal. Invoiced Gallons Received Prev. Month Jet-A Truck Quantity N/A 2131 N/A Prev. Month Qty 8828 4414 15373 (veeder-root) Purchases ( + ) 0 0 Sold ( - ) 636.75 709.4 1346.15 Used ( - ) 20 20 160 Total Qty ( = ) 8171.25 5815.6 13866.85 Month End Jet-A Truck Quantity N/A 1572 N/A Month End Qty ( - ) 8136 4248 13956 (veeter-root) Difference ( = ) 35.25 -4.4 30.85 100LL Gal. Jet-A Gal. Tax exempt Gal. 0 0 (includes used gals) Veeter-Root & Pump Readings 100LL Gal. Jet-A Gal. This month end inches: 89.58 52.1 This month end temp: 7.8 8.4 This month end meter: 8136 4248 (tanks only) Prev month end inches: 91.28 53.66 Prev month end temp: 16.7 16.5 Prev month end meter: 8828 4414 (tanks only) Price per gal: 5.25 5.2 Inventor gals: 8136 4248 Inventory Value: 42,714.00$ 22,089.60$ Total Inventory Value: 64,803.60$ Page 10 of 10

Source: City of Stevens Point website. First collected Oct 30, 2026.