Joint Plan Commission & Historic Preservation / Design Review Commission — Agenda Packet
City of Stevens Point · Portage County · City Plan Commission · meeting of Feb 2, 2026 · Agenda packets
Open the original document More from City of Stevens Point
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Date
and
Time:
February 2, 2026
5:00 PM
Our intention is to have in-person meetings going
forward. For the time being, we will hold the City
Committee Meetings, Plan Commission, Council and
most others at the Community Room at 933 Michigan
Avenue. This in-person location will meet the legal
requirement for our open meetings.
We will have a virtual option available, but the
technology for the hybrid style meeting may not be
reliable all of the time.
AGENDA
JOINT
CITY PLAN COMMISSION & HISTORIC
PRESERVATION / DESIGN REVIEW COMMISSION
Location: Community Room
Members
• Mayor Wiza
• Alderperson Kneebone
• Commissioner Arntsen
• Commissioner Beacom
• Commissioner Rice
• Commissioner Schade Stroik
• Commissioner Schuler
• Chair Tim Siebert
• Vice Chair Peter Munck
• Alderperson Marc Christianson
• Barry Calnan
• Carol Molepske
• Janet Jurgella Finn (Alternate 1)
• Dan Kryst (Alternate 2)
933 Michigan Avenue, Stevens Point, WI
OR
Zoom Teleconferencing
Meeting ID: 890 7161 8611
Passcode: 584895
By Computer:
https:// us02web.zoom. us/j/89071618611 ?pwd=LQTm 7Qx9xE Nvas8G
By Phone: +1-312-626-6799 (US Chicago)
Opening Section:
1. Roll Call
Discussion and Possible Action on:
2. Presentation by Somerville Architects on the proposed City Hall Campus.
3. A request from the City of Stevens Point for a design review to construct a principal
structure, parking lot and associated site improvements on an unaddressed parcel
bounded by Water Street and Ellis Street (Parcel ID 281240832202055), consistent with
Ch. 22.05(2).
4. A request from the City of Stevens Point for a site plan review to construct a principal
structure, parking lot and associated site improvements on an unaddressed parcel
bounded by Water Street and Ellis Street (Parcel ID 281240832202055).
Closing Section:
5. Adjourn
Page 1 of 40
Page 2 of 40
Page 1 of 9
Administrative Staff Report
Department of Community Development
1515 Strongs Avenue, Stevens Point, WI
54481
Ph: (715) 346-1568 - Fax: (715) 346-1498
Design Review & Site Plan Review
City Hall – Bounded by Ellis & Water Street
February 2, 2026
Applicant(s):
• City of Stevens Point
Staff:
• Adam Kuhn, Associate Planner
akuhn@stevenspoint.com
Parcel Number(s):
• 281240832202055
Zone(s):
• “B-3” Central Business District
Council District:
• District 9 – Ald. Lang
Planned Use:
• City Hall
Applicable Regulations:
• Chapter 22 – Historic
Preservation Ordinance
• Downtown Design Guidelines
• Chapter 23 – Zoning Ordinance
Request
A request from the City of Stevens Point for a design review to construct a
principal structure, parking lot and associated site improvements on an
unaddressed parcel bounded by Water Street and Ellis Street (Parcel ID
281240832202055), consistent with Ch. 22.05(2).
A request from the City of Stevens Point for a site plan review to construct a
principal structure, parking lot and associated site improvements on an
unaddressed parcel bounded by Water Street and Arlington Ellis Street
(Parcel ID 281240832202055).
City Official Design Review / Historic District
1. Downtown Historic Design Review District
Staff Recommendation
Approve the request for a design review to construct a principal structure,
parking lot and associated site improvements on an unaddressed parcel
bounded by Water Street and Ellis Street (Parcel ID 281240832202055),
subject to the following conditions:
1. A building permit shall be obtained prior to the start of construction.
2. The Designated Agent shall have the authority to approve minor
amendments to the plan set.
Approve the request for a site plan review to construct a principal structure,
parking lot and associated site improvements on an unaddressed parcel
bounded by Water Street and Arlington Ellis Street (Parcel ID
281240832202055), subject to the following conditions:
1. A building permit shall be obtained prior to the start of construction.
2. The Designated Agent shall have the authority to approve minor
amendments to the plan set.
Page 3 of 40
Page 2 of 9
Vicinity Map
Scope of Work
Overview: As Commissioners are aware, the City has been exploring the idea of relocating City Hall operations away
from the Portage County Courthouse building into a new space. After discussion, the Council last year elected to
construct a new City Hall building on the site identified in the vicinity map above.
The subject area is located within the Downtown Design Review District – one of three historic districts located within
the city. Properties identified in a local historic district, or applied a local landmark designation, must adhere to the
Historic Preservation / Design Review Commission’s Design Guidelines when building and site improvements are
requested. According to Section 7.4 of the Historic Preservation / Design Review Commission’s Design Guidelines, new
construction is considered a ‘major work’ and requires the review and approval of the Commission. Said requirement is
outlined below.
Sec. 7.4: Major and Minor Works
Sec. 7.4.1 Major Works (HPDRC Approval)
a. New construction or additions to primary buildings
The process to obtain a design review from the Historic Preservation / Design Review Commission is identified below.
CHAPTER 22: HISTORIC PRESERVATION
Division 5.02 Regulation of Construction, Reconstruction, Alteration, and Demolition
Page 4 of 40
Page 3 of 9
No owner or person in charge of a historic structure or historic site, or property located within a historic district shall
reconstruct, alter, or demolish all or any part of the exterior of such property or construct any improvement upon
such designated property or properties or cause or permit any such work to be performed upon such property or
demolish such property unless approval has been granted by the commission.
Upon the filing of any request for a
design review certificate with the
commission, the commission shall
review the request in accordance with
the design guidelines. If the commission
determines that the application for a
design review certificate and the
proposed changes are consistent with
the design guidelines, it shall issue the
design review certificate. Upon the
issuance of such certificate, any other
required permits shall be obtained.
Within this agenda is a request for the
City’s Plan Commission to conduct a site
plan review of the proposed building and
site development. Although action by the
Plan Commission is not required per the
City’s Zoning Code, City Administration
requested that the Plan Commission
provide input on the proposed site design.
An analysis of relevant site design
standards is highlighted below, based on
the enclosed plan submittal. As is
addressed throughout this report, the plan
submittal includes options to include and
not include an enclosed parking area that is
attached to the City Hall building. This
report examined both design options;
however, it will be up to the Common
Council in the weeks ahead as to whether
an enclosed parking area is included in the
final plans for bid.
HPDRC Guidelines of Review
(numbers below pertain to the pertinent
guideline standards)
***Other standards within the design
guidelines not specifically mentioned
below have been reviewed and are met or
not applicable pertaining to the proposed
building improvement activities.
SEC. 5.1.2: Commercial Construction: Massing, Scale & Orientation Guidelines
1. Buildings within Stevens Point's Downtown Historic / Design Review District are of similar heights. Therefore,
Site & Landscaping Plan – No Enclosed Parking Area
Site & Landscaping Plan – Including an Enclosed Parking Area
Page 5 of 40
Page 4 of 9
the height of a new building should be compatible with other buildings in the district when measured from
grade.
Analysis: The proposed building would stand two stories in height at a peak height of 38 feet. Adjacent buildings
range from being single-story (e.g., Children’s Wisconsin & the Beth Israel Synagogue) to five stories in height
(e.g., Berkshire).
Findings: The proposed two-story building would a comparable height to neighboring buildings and serve as a
gradual increase in peak building height from the south to the Downtown area.
2. All new buildings should be compatible in height with adjacent buildings on the block.
Analysis: Please see standard #1 above.
Findings: This standard is met.
3. A new building’s height to width ratio should be consistent with existing historic structures. Floor-to-floor
heights of new buildings should be similar to the proportions of the existing.
Analysis: The proposed building would stand 38 feet in height. A maximum building width of 197 feet would
exist if an enclosed parking area were not added onto the building. If the enclosed parking area is added onto
the building, maximum building width would be 218 feet.
Findings: The building has a proposed square look to it that is similar with other multi-story buildings located in
the near vicinity (e.g., Berkshire, Courthouse, etc.).
4. The overall building massing and placement on the lot should be similar to that of other buildings in the
historic district. Commercial buildings within the interior of the block should be built to the front property line
resulting in a continuous building line.
Analysis: A building setback of 66 feet is proposed off of Water Street. Adjacent buildings range significantly in
terms of the amount of building setback provided from a street. The Berkshire building provides roughly four
feet of street setback off of Water Street, 18 feet provided for the Beth Israel Synagogue, and 13 feet for the
Portage County Annex building. A greater street setback is being requested for City Hall due to the amount of
visitor traffic coming in and out of the site, and ensuring that parking accommodations in close proximity can be
provided. Additionally, the building is requested to be set back farther to preserve an open space area adjacent
to Water Street.
5. The space between buildings should reflect the existing pattern of property development within the district.
Historically, buildings within the interior of a block were built to the side property line, usually sharing a wall
with its neighbor.
Analysis: Ten feet of side yard setback is provided from the northwest lot line.
Findings: While it is common for buildings along Main Street and Clark Street to share a common wall along the
Page 6 of 40
Page 5 of 9
side lot line, buildings on the periphery of the Downtown provided greater separation from one another. The
proposed side yard setback allows for the minimum number needed to satisfy Building Code requirements,
while ensuring that it still meets the spirit of buildings in a historic district to be close to one another.
6. Where buildings are set back from the front property line, the parking should be to the side and rear only.
Analysis: Parking is provided in the front, side and rear elevations of the building.
Findings: As part of this request, the City is requesting a deviation from this standard to allow for parking closer
to the street lot line.
7. New buildings should have their main entrance and primary architectural façade facing the street. New
buildings should have a rear entrance to accommodate rear parking and access.
Analysis: The main entrance is proposed to be off of Water Street, with secondary employee only access along
the north elevation. Primary architectural details are located along the front elevation – ranging with the use of
brick veneer, metal wall panel and stone veneer.
Findings: This standard is met.
SEC. 5.1.3: Commercial Construction: Design, Proportion & Architectural Guidelines
1. The design of a new building should not attempt to create a false historic appearance, but rather complement
buildings in the existing district. New construction should have its own character and style.
Analysis: The proposed building aims to be compatible with the Weber Tackle Building that was historically
located on the subject area. As shown within the elevation plans, the proposed building complements key
features of the Weber Tackle Building – the use of brick veneer and a fenestration pattern that has a similar
ratio of solids and voids – to present an industrial feel for a building that will house an institutional use.
Findings: Staff believes that this standard is met.
Page 7 of 40
Page 6 of 9
2. Use materials that are common to the district such as brick, stone, terra cotta, wood, and metal. Modern
materials are appropriate on a new building, however, masonry should be the predominant material on the
façade as most of downtown’s historic structures are brick or stone. Whenever modern materials are used,
they should be similar in their physical qualities to historic materials found in the district.
Analysis: Brick veneer is the predominant façade material used on the proposed building, with other materials
used consisting of metal and stone.
Findings: This standard is met.
3. The fenestration of a new building should reflect that of existing historic structures within the district in
proportion, shape, location, pattern and size. The ratio of solids to voids on a building’s façade should reflect
the buildings within the same block.
Analysis: Please see standard #1 above.
Findings: The proposed fenestration pattern is consistent with other buildings located in the near vicinity,
particularly more modern buildings (e.g., Berkshire) located within the Downtown Design Review District.
4. New construction should include storefront elements proportional to that of existing historic structures.
Analysis: Storefront elements are not proposed due to the institutional use proposed within the building.
Findings: This standard is met.
5. Aluminum and vinyl siding are not recommended on new construction within the Downtown Historic / Design
Review District.
Analysis: Aluminum is the proposed material for the window muntins. Vinyl siding is not proposed.
Findings: While aluminum is proposed for the windows, its feature is small in scale compared to the other
façade materials that would be used.
6. Architectural details such as cornices, arches, and parapet walls give a building texture and define its scale.
New construction should reflect that of existing structures. The orientation and pattern of windows, doors,
and architectural details can help reduce the impact to new construction.
Analysis: A parapet wall and metal guard rail are proposed to provide greater variation in true building height.
Finding: This standard is met.
SEC. 3.14: Mechanical and Communication Equipment
4. Mechanical equipment including utility meters and heating and air conditioning equipment should be located
at the rear of a structure if feasible. Mechanical equipment which can be seen from the street should be
screened with shrubbery or appropriate fencing.
Analysis: Mechanical equipment is proposed on the roof of the building, which would be shielded from public
view via privacy fencing.
Findings: This standard is met.
SEC. 4.1: Landscaping Guidelines
4. When adding new landscaping, native and commonly occurring vegetation is recommended. New plant
materials should be appropriate in species and scale to existing plant materials in the immediate vicinity.
Analysis: The submitted landscaping plan proposes a range of 40’ tall trees, 3-4’ tall shrubs, ornamental grasses
Page 8 of 40
Page 7 of 9
and perennials. The landscaping is located primarily within landscaped areas within the parking lot and along the
perimeter of the building.
Findings: This standard is met.
5. Shrubbery planted along building edges and property lines should have a mature height of less than six (6)
feet.
Analysis: Most shrub species are proposed to be 3-4’ in height, with the exception of Techny Arborvitae that
would stand 10-15’ tall at maturity. These shrubs would be located near the southeast corner of the subject
area.
Findings: As part of this request, an exception is being sought to allow for a taller shrub to provide separation
between the City Hall building and the Beth Israel Synagogue.
6. Trees, shrubs, and fencing should be used to screen service areas, garbage enclosures and, whenever possible,
parking areas.
Analysis: Trees and shrubs are located within the parking lot in accordance with the City’s Zoning Code.
Findings: This standard is met.
SEC. 4.2: Lighting Guidelines
1. The design of lighting fixtures and poles should be compatible in size, scale, material, and brightness with the
structure, landscape, and neighborhood setting.
Analysis: Bollards are proposed to be located throughout the parking lot at a height of 30 inches from grade.
Findings: The proposed bollards have a more pedestrian feel given their short height and best assimilates with
the broader historic district by ensuring that it complements adjacent site designs.
SEC. 4.3.1: Parking Lot Guidelines
1. Parking lots, driveways, and sidewalks shall comply with any ordinance requirements for size and landscaping
elements as well as site grading.
Analysis: The parking lot satisfies minimum design standards as outlined in the City’s Zoning Code.
Findings: This standard is met.
4. Large expanses of parking are not recommended. Parking should be adequately landscaped with buffers and
vegetative islands. Pedestrian access and crossings should be clearly designated in parking areas.
Analysis: The parking lot is broken up by terminal landscaped islands as required in the City’s Zoning Code.
Perimeter landscaping is also proposed.
Findings: This standard is met.
6. Commercial parking areas should be surfaced with suitable materials such as asphalt, concrete, brick, etc.
Gravel, crushed stone, or other loose material including unpaved lots are not recommended.
Analysis: The parking lot would comprise of asphalt.
Findings: This standard is met.
Page 9 of 40
Page 8 of 9
Site Plan Review
1. Setbacks.
Analysis: The subject area is zoned “B-3” Central Business District. Within the “B-3” District, there are no street,
side and rear setback requirements.
Findings: The setbacks that are provided exceed minimum requirements for the “B-3” District.
Lot
Line
B-3 Setback
Requirements
Proposed Setbacks – No Enclosed
Parking
Proposed Setbacks – Enclosed Parking
Street 0 feet 66’ off of Water Street, 101’ off of Ellis
Street
66’ off of Water Street, 101’ off of Ellis
Street
Side 0 feet 10’ off of northwest lot line, 147’ off of
southeast lot line
10’ off of northwest lot line, 127’ off of
southeast lot line
Rear 0 feet 150’ 99’
2. Density.
Analysis: Within the “B-3” District, permitted commercial land uses do not have a minimum lot size
requirement.
Findings: As the subject property is 128,851 square feet in size, the proposed use meets minimum density
restrictions.
3. Building Height.
Analysis: The proposed structure will be 38 feet tall.
Findings: Buildings within the “B-3” District are restricted to a max height of 35 feet. Structures may surpass 35
feet in height, at a height not to exceed 85 feet, if a fire prevention system exists that is approved by the Fire
Department. The proposed structure would be equipped with a fire prevention system.
4. Parking and Traffic Flow.
Analysis: As the subject property is zoned “B-3” Central Business District, minimum off-street parking
requirements identified in the Zoning Code are waived. With the enclosed garage, the proposal seeks 72 surface
parking stalls and 15 indoor parking stalls. Without the enclosed garage, the proposal seeks 87 surface parking
stalls. One access point is proposed off Ellis Street, Arlington Place and Water Street.
Findings: The number of parking stalls provided aligns with the number of City employees who would work in
the building, along with providing ample visitor parking areas for peak times of the year (e.g., committee
meetings, tax payments, etc.). With access points off of each adjoining public street, staff believes that traffic
circulation is sufficient within and around the site.
5. Utilities.
Page 10 of 40
Page 9 of 9
Analysis: Utility infrastructure exists within the adjacent street right-of-way to accommodate the proposed
development. Infiltration basins are proposed along the south and east lot lines. Public Utilities staff have
reviewed the proposed stormwater facilities and believes that it can handle anticipated stormwater flow as a
result of the proposed development.
Findings: This standard is met.
6. Landscaping.
Analysis: The submitted landscaping plan proposes a range of 40’ tall trees, 3-4’ tall shrubs, ornamental grasses
and perennials. The landscaping is located primarily within landscaped areas within the parking lot and along the
perimeter of the building.
Findings: Based on the landscaping plan submitted, City staff believes that it meets minimum landscaping
requirements as outlined within the Zoning Code.
Page 11 of 40
HISTORIC PRESERVATION/
DESIGN REVIEW
COMMISSION
City of Stevens Point
Community Development Department
1515 Strongs Avenue, Stevens Point, WI 54481
W͗(715) 346-1567 &͗(715) 346-1498
communitydevelopment@stevenspoint.com
http://stevenspoint.com
Application for Design Review Page 1 of 2
APPLICATION FOR DESIGN REVIEW
ADMINISTRATIVE SUMMARY (Staff Use Only)
Application # Date Submitted Assigned Case
Manager
Associated Permits or
Applications (if any)
Pre-Application
Conference Date
Decision Date Reviewed Staff Signature
Notes:
APPLICANT/CONTACT INFORMATION
APPLICANT INFORMATION CONTACT INFORMATION (Same as Applicant? )
Applicant Name Contact Name
Address Address
City, State, Zip City, State, Zip
Telephone Telephone
Fax Fax
Email Email
OWNERSHIP INFORMATION
PROPERTY OWNER OF RECORD 1 INFORMATION (Same as Applicant? ) PROPERTY OWNER OF RECORD 2 INFORMATION (If Needed)
Owner’s Name Owner’s Name
Address Address
City, State, Zip City, State, Zip
Telephone Telephone
Fax Fax
Email Email
PROJECT SUMMARY
Subject Property Location [Please Include Address and Assessor’s Identification Number(s)]
Parcel 1 Parcel 2 Parcel 3
Legal Description of Subject Property
Area of Subject Property (Acres/Sq Ft) Area of Building or Structure (Sq Ft)
City of Stevens Point Jarod Kivela
1515 Strongs Ave 1515 Strongs Ave
Stevens Point, WI 54481 Stevens Point, WI 54481
715-346-1570 715-346-1567
jkivela@stevenspoint.com
City of Stevens Point
1515 Strongs Ave
Stevens Point, WI 54481
715-346-1570
1039 Ellis Street (Parcels being combined; see CSM)
Lot 1 of Portage County Certified Survey Map Number 012080, located in Government Lot 2 of Section
32, Township 24 North, Range 8 East, City of Stevens Point, Portage County, Wisconsin.
2.958 acres (128,851 sqft) Approx 38,000 sqft primary structure (additional may be added if garage is constructed).
Page 12 of 40
Application for Design Review Page 2 of 2
Current Zoning District(s) Current Historic District(s) - Local, State, National
Designated Future Land Use Category Current Use of Property Proposed Use of Property
Briefly describe the proposed building, structure construction, reconstruction or exterior alteration. Please also provide rationale for the design review request, along
with the time schedule (if any) for the project. (Use additional pages if necessary)
Will the proposed work detrimentally change, destroy or adversely affect any exterior architectural features of the improvement upon which said work is to be done?
Explain you answer.
Does the proposed work match and harmonize with the external appearance of adjacent neighboring improvements. Explain your answer.
Does the proposed work conform to the objectives of the historic preservation plan for said district (if any)? Explain you answer.
Does the proposed work conform with the architectural design guidelines with emphasis on contextual issues including compatibility of size, volume proportions,
rhythm, materials, detailing, colors, and expressiveness? (Historic Design Guidelines can be found at www.stevenspoint.com) Explain you answer.
EXHIBITS
Letter to District Alderperson (www.stevenspoint.com/Directory) Additional Exhibits If Any (List):
Photographs of Building or Structure
Renderings or Elevations
Site Plan (for additions, and new construction)
CERTIFICATION AND SIGNATURE
By my signature below, I certify that the information contained in this application is true and correct to the best of my knowledge at the time of the application. I
acknowledge that I understand and have complied with all of the submittal requirements and procedures and that this application is a complete application submittal. I
further understand that an incomplete application submittal may cause my application to be deferred to the next posted deadline date.
Signature of Applicant Date Signature of Property Owner(s) Date
pp
ϭͬϮϲͬϮϲ ϭͬϮϲͬϮϲ^ĞĞĂƚƚĂĐŚĞĚĞŵĂŝůĨŽƌDĂLJŽƌĂƉƉƌŽǀĂů
B3 - Central Business District (Future Zoning of "Institutional") Downtown Design Review District
Downtown District Vacant/Storage for Portage County - Building Being Razed City of Stevens Point City Hall Offices
See attached document
See attached document
See attached document
See attached document
See attached document
CSM, Landscaping plan and lighting plan. Note:
sample materials will be available at the meeting.
✔
✔
Page 13 of 40
Briefly describe the proposed building, structure construction, reconstruction or
exterior alteration. Please also provide rationale for the design review request, along
with the time schedule (if any) for the project. (Use additional pages if necessary)
The proposed project includes the construction of a new City Hall building at 1039 Ellis
Street (may be readdressed). The existing structure on the property is currently being
demolished. Following completion of the demolition, a new municipal facility will be
constructed on site (closer to Water Street). The proposed building is intended to meet
modern City Hall operational needs while reinforcing the architectural character of the
Downtown Design Review District.
The new building design is being developed to pay homage to the original Weber Tackle
(Weber Lifelike Fly) building that historically occupied the site (the Frost Fishing Tackle
Company was purchased by Weber Tackle in 1926 and moved to this location in 1928).
Since the construction of the original Weber Tackle building, numerous additions were
made, and substantial exterior changes occurred over time, resulting in the loss of much of
the building’s historic architectural image. Most notable was the covering of the original
brick and windows with EIFS-type material. With the existing structure being razed, the
proposed City Hall design will reference historic photographs and incorporate materials
and architectural elements reflective of the original building’s character. Proposed features
include brick façades with soldier coursing, brick lintels, and other traditional architectural
detailing, as well as large, tall windows that mimic the scale and proportions of the original
structure’s openings and enhance the building’s street presence.
While the design incorporates historic-inspired elements, it also introduces
complementary contemporary materials to support a modern and timeless civic facility.
This includes the incorporation of Corten steel, referencing the “POINT” sign on the north
side of the community and other civic art elements in Stevens Point, along with a white
brick/stone palette that works cohesively with the Bedford limestone found on many
downtown buildings (Sentry). These elements will be brought together with a solid, dark
metal trim system to provide a cohesive, durable, and timeless finish.
This design review request is being submitted to confirm that the proposed City Hall design
aligns with the intent of the Downtown Design Review District. As a public building and
long-term civic investment, the City and its design team are focused on creating a facility
that both honors the history of the site and contributes a high-quality, functional, and
lasting addition to the downtown environment.
Page 14 of 40
Tentative Project Timeline:
o Completion of construction plans: early April
o Council authorization to bid: April 20
o Bid opening/closing: May 12
o Council consideration/award of construction contract: June 1
o Anticipated construction start: June or early July
Will the proposed work detrimentally change, destroy or adversely affect any exterior
architectural features of the improvement upon which said work is to be done? Explain
you answer.
No. The proposed work will not detrimentally change, destroy, or adversely affect exterior
architectural features of the existing improvement because the current structure has
already been substantially altered over time and no longer retains intact, character-
defining historic exterior features. The existing building is being demolished as part of an
approved redevelopment plan, and the proposed project involves new construction rather
than rehabilitation of the existing façade. The new City Hall design is intended to enhance
the architectural character of the site by incorporating historically inspired materials and
detailing that pay tribute to the original Weber Tackle building while meeting modern
standards and the intent of the Downtown Design Review District.
Does the proposed work match and harmonize with the external appearance of
adjacent neighboring improvements. Explain your answer.
Yes. The proposed building is designed to match and harmonize with the external
appearance of adjacent and nearby downtown improvements through its use of durable,
high-quality materials and architectural detailing that reflects the traditional character of
the area. The design incorporates brick façade elements, window proportions, and historic-
inspired features that are consistent with the scale and rhythm found throughout the
downtown district. In addition, complementary modern materials such as corten steel and
lighter masonry/stone elements are being incorporated in a way that remains cohesive with
surrounding buildings and the broader Downtown Design Review District standards.
Overall, the proposed City Hall will reinforce the established architectural character of the
neighborhood while providing a modern, timeless civic building that fits within its context.
Does the proposed work conform to the objectives of the historic preservation plan for
said district (if any)? Explain you answer.
Page 15 of 40
Yes. The proposed work conforms to the objectives of the Historic Preservation Plan for the
district because it is designed to respect and reinforce the historic character of the
downtown area, even though the existing structure on the site has lost most of its original
historic integrity due to extensive modifications over time. The proposed City Hall will
incorporate historic-inspired architectural elements, including traditional masonry
materials, brick detailing (such as soldier coursing and lintels), and vertically proportioned
window openings, to reflect the character of the original Weber Tackle-era building and the
broader downtown building patterns.
In addition, the project supports the intent of historic preservation planning by promoting
context-sensitive new construction that complements surrounding development,
contributes to a cohesive streetscape, and acknowledges the community’s industrial
heritage while providing a functional, long-term civic facility.
Does the proposed work conform with the architectural design guidelines with
emphasis on contextual issues including compatibility of size, volume proportions,
rhythm, materials, detailing, colors, and expressiveness? (Historic Design Guidelines
can be found at www.stevenspoint.com) Explain you answer.
Yes. The proposed City Hall design is intended to conform with the architectural design
guidelines and emphasizes contextual compatibility with the Downtown Design Review
District. The building’s overall massing and proportions are being designed to fit within the
scale of surrounding downtown development, with strong façade details and large window
openings to establish an appropriate rhythm along the street. The project incorporates
durable, high-quality materials, most notably traditional masonry/brick, along with historic-
inspired detailing such as brick soldier coursing and lintels to reflect the architectural
character found throughout the district and to pay tribute to the original Weber Tackle-era
building on the site.
In addition, the proposed material choices and exterior finishes are intended to be
cohesive with nearby downtown structures by incorporating complementary elements
such as lighter masonry/stone tones consistent with existing limestone features
downtown, balanced with modern accents like Corten steel and a timeless dark metal
trim. Overall, the design blends historic reference points with contemporary civic
architecture in a way that supports compatibility in size, volume, rhythm, materials,
detailing, and overall visual expression, consistent with the intent of the City’s architectural
design guidelines.
Page 16 of 40
PROPOSED CITYHALL BUILDINGFFE = 1091.50
INFILTRATION BASINELEV: 1087.50
INFILTRATION BASINELEV: 1088.50
INFILTRATION BASINELEV: 1088.50INFILTRATION BASINELEV: 1088.00
LAWNAREA LAWNAREA
LAWNAREA
INFILTRATION BASINELEV: 1089.50
LAWNAREA
GENERAL NOTES:PLANTING SCHEDULE:
UTILITY DISCLAIMER:BENCHMARK:BENCHMARK #1
0'30'60'1" = 30'Project No.Sheet:Date:
designmatters
SCALE VERIFICATION1" AT FULL SCALE
DESIGN DEVELOPMENT
sm
CITY OF STEVENS POINTNEW CITY HALLPROJECT LOCATION799712/30/25L100
LANDSCAPEPLAN
LEGEND:KEYNOTES:
Page 17 of 40
PROPOSED CITYHALL BUILDINGFFE = 1091.50
INFILTRATION BASINELEV: 1087.50
INFILTRATION BASINELEV: 1088.50
INFILTRATION BASINELEV: 1088.50INFILTRATION BASINELEV: 1088.00
LAWNAREA LAWNAREA
LAWNAREA
INFILTRATION BASINELEV: 1089.50
LAWNAREA
EROSION CONTROL LEGEND:GENERAL NOTES:
UTILITY DISCLAIMER:BENCHMARK:BENCHMARK #10'30'60'1" = 30'Project No.Sheet:Date:
designmatters
SCALE VERIFICATION1" AT FULL SCALE
DESIGN DEVELOPMENT
sm
CITY OF STEVENS POINTNEW CITY HALLPROJECT LOCATION799712/30/25C400
EROSIONCONTROLPLAN
Page 18 of 40
PROPOSED CITYHALL BUILDINGFFE = 1091.50
INFILTRATION BASINELEV: 1087.50
INFILTRATION BASINELEV: 1088.50
INFILTRATION BASINELEV: 1088.50INFILTRATION BASINELEV: 1088.00
LAWNAREA LAWNAREA
LAWNAREA
BID ALTERNATEBUILDING ADDITIONAND PARKING
LAWNAREA
UTILITY DISCLAIMER:BENCHMARK:BENCHMARK #1
0'30'60'1" = 30'Project No.Sheet:Date:
designmatters
SCALE VERIFICATION1" AT FULL SCALE
DESIGN DEVELOPMENT
sm
CITY OF STEVENS POINTNEW CITY HALLPROJECT LOCATION799712/30/25L100A
LANDSCAPEPLAN
GENERAL NOTES:PLANTING SCHEDULE:LEGEND:KEYNOTES:
Page 19 of 40
PROPOSED CITYHALL BUILDINGFFE = 1091.50
INFILTRATION BASINELEV: 1087.50
INFILTRATION BASINELEV: 1088.50
INFILTRATION BASINELEV: 1088.50INFILTRATION BASINELEV: 1088.00
LAWNAREA LAWNAREA
LAWNAREA
BID ALTERNATEBUILDING ADDITIONAND PARKING
LAWNAREA
UTILITY DISCLAIMER:BENCHMARK:BENCHMARK #10'30'60'1" = 30'Project No.Sheet:Date:
designmatters
SCALE VERIFICATION1" AT FULL SCALE
DESIGN DEVELOPMENT
sm
CITY OF STEVENS POINTNEW CITY HALLPROJECT LOCATION799712/30/25C400A
EROSIONCONTROLPLAN
EROSION CONTROL LEGEND:GENERAL NOTES:
Page 20 of 40
J
J
FLAGPOLES
NEW CITY HALL
WATER STREET
ELLIS STREET
X5
X5
X3
X3
X3
30
31
X3H
X3H
X3H
X3H
Z1
Z1
Z1
Z1
Z1 Z1 Z1
Z1 Z1
Z1
Z1
Z1
Z1
X5
X3H
X5
X5
X5 X5
X1 X1 X1 X1 X1
F1 F1
F1 F1 F1
F1
F1
POLE BASE DETAIL - FIXTURE
ABOVE GRADE
1" CONDUIT (TYPICAL)
30"
CONDUIT
6"
8" MIN.
MIN.
6' -0"
2"
20"
2"
3" CLEAR
GRADE GRADE
24"
MINIMUM
GROUND ROD
FORM ALL EXPOSED
CONCRETE.
PROVIDE 3/4"
RADIUS BULLNOSE
ALL AROUND.
LOCK WASHER (TYPICAL)
STUB CONDUIT UP WITHIN
BASE DIAMETER
BOLT CIRCLE AS
DETERMINED BY POLE
MANUFACTURER
TYPICAL - APPLY LUBRICANT
TO ALL BASE BOLTS.
3/4" DIA.x10' -0"
COPPERCLAD
GROUND ROD
REQUIRED.
MINIMUM 8" GREATER
THAN BOLT CIRCLE
DIAMETER
GROUNDING BUSHING ON
EACH CONDUIT
SIZE AND LENGTH OF ANCHOR
BOLTS AS DETERMINED BY
POLE MANUFACTURE. 4" L
BEND TYPICAL
GRADE 60 #4 REBAR
TYPICAL
ORIENT ANCHOR BOLTS
PARALLEL TO THE
CURB LINE
A. PROVIDE A SPARE CONDUIT STUB AT
EACH END -OF -LINE FIXTURE. SEE
PLANS FOR ADDITIONAL SPARE STUBS.
4'-7"
3'-0" MIN.
LIGHT BOLLARD BASE DETAIL
GROUND ROD.
1/2" x 8'-0" COPPER CLAD
12" DIA. CONCRETE BASE
BY GENERAL CONTRACTOR
TO NEXT FIXTURE
1" PVC CONDUIT
#3 TIES AT 12" O. C.
GRADE
4 - #6 VERT.
WITH 3 TIES AT TOP
2"
CONDUIT
GROUND ROD
STUB CONDUIT UP WITHIN
BASE DIAMETER
BOLT CIRCLE AS
DETERMINED BY POLE
MANUFACTURER
MINIMUM 8" GREATER
THAN BOLT CIRCLE
DIAMETER
ORIENT ANCHOR BOLTS
PARALLEL TO THE
CURB LINE
This drawing may not be reproduced without the written permission of Somerville, Inc. Permission or copies of this
drawing may be obtained by emailing: Planrequests@somervilleinc.com
Project No.
Sheet:
Date:
design matters
Somerville, Inc. c
SCALE VERIFICATION
1" AT FULL SCALE
PRELIMINARY
sm
1/26/2026 3:26:43 PM
CITY OF STEVENS POINT
NEW CITY HALL
PROJECT LOCATION
7997
2/2/2026
E104
2026
PLAN NOTES: X
N
ELECTRICAL - LIGHTING
SCALE: E104 1/16" = 1'-0"
SITE PLAN - BASE BID 1
30 PROVIDE POWER FOR MONUMENTAL SIGN.
31 PROVIDE CONDUIT STUB FOR FUTURE PUBLIC ART DISPLA Y
LIGHT.
NO SCALE
E104
2
NO SCALE
E104
3
Revision Description Date
Page 21 of 40
J
J
FLAGPOLES
NEW CITY HALL
WATER STREET
ELLIS STREET
X5
X5
X5 X5
X3
X3
X3
30
31
X3H
X3H
X3H
X3H
Z1
Z1
Z1
Z1
Z1 Z1 Z1
Z1 Z1
Z1
Z1
Z1
Z1
X5
X3H
X5
X1 X1 X1 X1 X1
F1 F1
F1 F1 F1
F1
30 F1
F1
This drawing may not be reproduced without the written permission of Somerville, Inc. Permission or copies of this
drawing may be obtained by emailing: Planrequests@somervilleinc.com
Project No.
Sheet:
Date:
design matters
Somerville, Inc. c
SCALE VERIFICATION
1" AT FULL SCALE
PRELIMINARY
sm
1/26/2026 3:26:45 PM
CITY OF STEVENS POINT
NEW CITY HALL
PROJECT LOCATION
7997
2/2/2026
E105
2026
PLAN NOTES: X
30 PROVIDE POWER FOR MONUMENTAL SIGN.
31 PROVIDE CONDUIT STUB FOR FUTURE PUBLIC ART DISPLA Y
LIGHT.
ELECTRICAL - LIGHTING
SCALE: E105 1/16" = 1'-0"
SITE PLAN - ALTERNATE BID 1 N
Revision Description Date
Page 22 of 40
Designer
Date
01/26/2026
Scale
Not to Scale
Drawing No.
Summary
1 of 1
Statistics
Description Symbol Avg Max Min Max/Min Avg/Min
Calc Zone #1 2.6 fc 19.0 fc 0.1 fc 190.0:1 26.0:1
1.7
2.6
1.6
0.9
0.5
0.3
1.6
0.5
1.4
0.3
1.9
0.5
1.1
1.2
2.9
0.4
1.1
2.7
6.4
3.8
3.2
4.2
5.9
2.8
1.8
0.7
0.2
0.3
0.5
0.6
0.5
0.9
1.1
0.6
0.4
2.6
3.6
1.7
0.9
0.5
0.7
3.6
1.0
0.2
0.2
0.5
0.9
2.0
2.8
3.2
2.1
1.1
0.5
2.5
3.5
2.1
1.2
0.6
0.4
8.4
1.5
0.2
0.2
0.6
1.9
4.4
4.6
3.9
2.6
1.3
0.6
3.8
4.4
2.8
1.4
0.6
0.4
7.5
1.9
0.3
0.2
0.2
0.2
0.5
1.2
3.6
5.1
4.0
2.9
1.8
0.8
0.3
4.0
4.5
2.9
1.5
0.7
0.7
7.4
2.0
0.4
0.4
0.4
0.5
1.7
2.6
3.8
3.8
2.7
1.7
0.9
0.4
2.6
3.6
2.3
1.3
0.7
0.5
10.3
2.2
0.6
0.7
1.1
2.6
3.4
3.0
2.9
2.5
1.5
0.8
0.4
3.0
3.9
2.1
1.3
0.9
0.7
7.2
2.1
0.8
1.4
3.8
5.2
4.0
3.0
2.0
1.2
0.6
0.3
2.3
3.3
2.3
1.7
1.2
1.3
10.2
2.0
0.8
2.1
4.7
4.8
3.4
2.2
1.2
0.6
0.3
2.7
3.7
3.2
2.4
1.9
1.8
5.1
1.6
0.9
3.1
4.9
3.8
2.6
1.5
0.7
0.4
0.2
12.9
4.6
12.7
3.4
11.6
2.6
12.9
1.3
1.8
2.4
2.3
1.8
4.1
4.0
3.3
2.0
1.1
0.6
0.3
0.2
4.7
4.3
5.6
4.0
4.7
3.0
3.5
11.4
1.6
13.1
2.5
13.8
3.3
2.7
1.9
1.2
0.7
0.4
0.2
3.1
4.1
4.4
4.7
3.9
3.0
2.2
2.3
2.4
1.5
2.1
2.5
2.9
3.1
2.7
2.1
1.4
0.8
0.4
0.2
3.3
4.3
4.7
5.6
4.4
3.1
2.2
2.0
1.6
2.9
2.5
2.7
3.1
3.3
2.8
2.3
1.6
1.0
0.5
0.2
4.1
4.8
4.4
4.2
3.5
2.9
2.1
1.5
0.9
6.2
2.9
2.8
3.7
4.5
3.1
2.4
1.7
1.1
0.5
0.2
3.5
4.8
4.3
3.6
3.0
2.6
2.0
3.1
5.6
11.1
2.9
2.7
3.5
4.1
3.0
2.4
1.7
1.1
0.6
0.3
2.8
4.1
3.5
2.9
2.4
2.0
1.6
1.5
1.2
5.1
2.8
2.6
2.8
2.9
2.6
2.3
1.6
1.0
0.5
0.3
3.7
4.6
3.0
2.4
2.0
1.7
1.4
3.1
6.9
3.5
2.6
2.1
2.2
2.3
2.2
1.9
1.4
0.9
0.5
0.3
3.3
4.5
3.3
2.5
1.9
1.6
1.4
2.0
2.3
13.5
16.0
13.9
5.5
2.2
1.7
1.8
1.8
1.7
1.4
1.2
0.8
0.5
0.3
4.3
5.3
4.1
3.0
2.3
2.0
1.8
2.2
2.2
0.8
0.5
0.3
0.5
1.5
3.7
7.2
8.3
7.3
11.0
2.1
1.5
1.6
1.6
1.5
1.3
1.1
0.8
5.1
6.0
4.8
3.7
2.9
2.6
2.4
4.1
7.3
0.9
0.5
0.3
0.4
0.6
0.8
0.9
1.0
0.9
5.3
2.4
1.8
1.9
1.9
1.8
1.6
1.3
0.9
3.6
5.2
4.6
4.0
3.5
3.3
2.8
2.6
1.9
1.0
0.6
0.4
0.3
0.5
0.6
0.6
0.5
0.3
4.0
2.8
2.4
2.5
2.5
2.4
2.1
1.5
1.0
4.2
5.8
4.4
4.1
4.4
4.4
3.2
4.5
8.0
1.1
0.6
0.4
0.4
0.8
1.2
1.2
0.8
0.5
6.3
3.1
2.7
3.0
3.2
2.8
2.5
1.8
1.1
3.8
5.5
4.7
4.3
4.5
4.5
3.2
2.6
2.0
1.3
0.9
1.0
1.5
2.5
4.1
4.1
2.5
1.7
11.7
3.2
3.1
3.9
4.8
3.4
2.7
1.9
1.3
4.6
6.0
5.4
4.6
4.1
3.8
3.3
2.8
2.3
1.8
1.6
2.0
3.3
4.7
5.1
5.2
4.8
3.5
2.7
5.0
11.6
7.7
4.0
5.9
3.3
3.3
4.0
4.6
3.6
3.0
2.2
1.4
6.0
7.5
6.6
5.6
4.9
4.3
3.9
3.7
3.5
3.2
3.1
3.3
3.8
4.4
4.3
4.4
4.5
3.7
3.0
3.0
3.3
3.1
2.7
2.6
3.3
3.3
3.6
3.9
4.1
3.8
3.3
2.4
1.5
4.7
7.1
6.4
5.9
5.2
4.9
4.3
4.3
4.3
4.1
4.0
4.1
3.8
3.4
3.4
3.6
3.7
3.4
3.0
2.6
2.3
1.9
1.6
1.7
2.4
3.1
3.7
4.0
4.0
3.9
3.4
2.5
1.5
5.1
7.1
5.0
3.7
4.1
4.5
4.0
4.0
3.7
2.8
2.7
3.4
3.2
2.8
3.3
3.3
3.3
3.1
3.2
2.9
2.6
2.1
1.7
1.7
2.1
2.8
3.5
3.9
4.1
3.7
3.2
2.4
1.5
2.5
3.3
2.3
1.9
1.3
1.0
1.2
0.9
0.7
0.8
0.8
0.6
0.7
2.2
3.8
3.9
3.4
3.3
4.2
3.5
2.7
2.1
1.7
1.6
2.0
2.5
3.2
4.0
4.8
3.6
2.9
2.1
1.4
0.4
2.2
3.9
4.6
3.7
3.3
4.3
3.5
2.7
2.1
1.7
1.5
1.8
2.3
2.9
3.8
4.6
3.3
2.7
1.9
1.2
0.4
2.7
3.5
4.7
3.8
3.0
3.0
2.7
2.5
2.0
1.5
1.4
1.6
2.1
2.6
2.8
3.0
2.7
2.4
1.7
1.1
0.4
2.7
3.4
4.5
3.4
2.5
2.3
2.2
2.1
1.7
1.4
1.2
1.4
1.7
2.1
2.2
2.2
2.1
1.9
1.4
0.9
0.3
2.1
3.6
4.0
2.8
2.1
2.0
1.9
1.8
1.6
1.4
1.4
1.4
1.6
1.6
1.7
1.6
1.5
1.3
1.0
0.6
0.3
1.7
3.5
3.6
3.1
2.8
2.8
2.7
2.4
2.3
2.3
2.5
2.5
2.4
2.1
1.6
1.3
1.0
0.7
0.6
0.4
0.2
1.1
2.5
3.3
3.8
3.7
3.7
3.7
3.5
3.3
3.6
3.6
3.6
3.4
3.0
2.0
1.1
0.6
0.4
0.3
0.2
1.6
2.8
3.4
2.5
2.3
3.1
3.7
3.6
3.8
2.9
2.2
2.9
3.2
2.0
0.9
0.4
0.2
0.2
0.5
0.8
0.7
1.0
1.0
0.8
1.0
1.0
1.0
1.0
1.2
1.0
0.9
0.6
0.3
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
0.1
0.1
0.1
0.1
0.1
19.0
M1 M1
Z1
Z1
Z1
Z1
Z1
Z1
Z1
Z1 Z1 Z1 Z1 Z1 Z1
M2
M2
M1
M1
M1
M1
M1
M1 M1 M1 M1
G6 G6 G6
G6 G6 G6
G6
X1 X1 X1 X1 X1
B1 B1
B1
B1
B1
B1
B1
B1 B1 B1
X3H
X3H
X3H
X3H
X3H
X5 X5
X5
X5
X5
X5
B2. B1
B2.
X3
X3
X3
Plan View
Scale - 1" = 20ft
Schedule
Label Manufacturer Description LLF Input
Power
M1
6x18 up_down cylinder - VR15, 4000K,
90CRI 25 degree
0.9 22.2
M2
Cree Lighting, Lighting
Module
'2000lm' Puck With Flat Diffuse Plastic Lens 0.9 24.4
B1
COOPER LIGHTING
SOLUTIONS - McGraw-
Edison
GEKKO WALL PACK 4000LM PACKAGE
70CRI 4000K FIXTURE w/ TYPE III
DISTRIBUTION OPTIC
0.9 26.5
G6
PRESCOLITE 6" LiteFrame Round Shallow Downlight,
2000 lumens, 4000K, 80+CRI, Medium,
Specular Clear
0.9 16.43
Z1
WILLIAMS OUTDOOR LED 835cct 0.9 27.1
X1
Spring City Electrical
Manufacturing Co
Cast aluminum housing, frosted glass lens
enclosure with a luminum top
0.9 120
X3
COOPER LIGHTING
SOLUTIONS - McGRAW-
EDISON (FORMERLY
EATON)
GALLEON AREA AND ROADWAY LUMINAIRE
(3) 90 CRI, 4000K, 615mA LIGHTSQUARES
WITH 16 LEDS EACH AND TYPE III OPTICS
1 93
X3H
COOPER LIGHTING
SOLUTIONS - McGRAW-
EDISON (FORMERLY
EATON)
GALLEON AREA AND ROADWAY LUMINAIRE
(3) 90 CRI, 4000K, 615mA LIGHTSQUARES
WITH 16 LEDS EACH AND TYPE III OPTICS
WITH HOUSE SIDE SHIELD
0.9 93
X5
COOPER LIGHTING
SOLUTIONS - McGRAW-
EDISON (FORMERLY
EATON)
GALLEON AREA AND ROADWAY LUMINAIRE
(3) 90 CRI, 4000K, 1200mA
LIGHTSQUARES WITH 16 LEDS EACH AND
TYPE V WIDE OPTICS
1 184
Note
1. ALL PARKING AREA FIXTURES ( EXCLUDING TYPE X1)
TO BE PROVIDED WITH INTEGRAL OCCUPANCY SENSOR
AND 30% DIMMING CONTROL.
Page 23 of 40
Designer
Date
01/26/2026
Scale
Not to Scale
Drawing No.
Summary
1 of 1
Statistics
Description Symbol Avg Max Min Avg/Min Max/Min
Calc Zone #1 2.7 fc 39.0 fc 0.1 fc 27.0:1 390.0:1
1.7
2.6
1.6
0.9
0.5
0.5
1.7
0.7
1.9
0.7
2.2
0.9
1.5
1.2
2.7
1.5
1.2
2.9
6.7
3.9
3.2
4.4
6.1
2.6
1.8
0.7
0.2
0.2
0.3
0.4
0.6
0.4
0.8
0.9
0.6
0.3
2.6
3.6
1.7
1.0
0.7
1.0
3.2
1.0
0.2
0.2
0.4
0.8
1.7
2.5
2.8
1.9
0.9
0.5
2.5
3.5
2.2
1.2
0.8
0.9
8.7
1.6
0.2
0.2
0.5
1.6
3.8
4.0
3.4
2.2
1.1
0.5
3.8
4.4
2.9
1.5
0.8
0.8
7.7
2.0
0.3
0.2
0.2
0.2
0.4
1.1
3.2
4.4
3.4
2.5
1.6
0.7
0.3
4.0
4.6
2.9
1.6
0.9
1.0
7.6
2.2
0.5
0.4
0.3
0.5
1.5
2.3
3.3
3.3
2.4
1.5
0.8
0.3
2.6
3.6
2.3
1.4
0.9
0.9
10.7
2.3
0.6
0.7
1.0
2.2
3.0
2.6
2.5
2.1
1.3
0.7
0.3
3.0
3.9
2.1
1.4
1.1
1.1
7.3
2.1
0.8
1.2
3.3
4.5
3.5
2.6
1.7
1.0
0.5
0.2
2.3
3.3
2.4
1.8
1.5
1.8
10.6
2.0
0.8
1.8
4.0
4.1
2.9
1.8
0.9
0.4
0.2
2.7
3.7
3.2
2.5
2.1
2.2
5.3
1.7
0.8
2.6
4.1
3.2
2.1
1.1
0.5
0.2
12.9
4.7
12.7
3.4
11.8
2.8
13.3
2.2
3.6
2.6
2.2
1.6
3.5
3.2
2.5
1.4
0.7
0.3
4.7
4.3
5.6
4.0
4.8
3.1
3.8
13.9
1.9
13.0
2.1
13.1
2.4
1.8
0.9
0.4
0.2
3.1
4.1
4.4
4.7
4.0
3.1
2.4
15.2
3.0
7.0
4.0
1.2
1.0
1.3
2.6
1.8
2.0
2.1
2.2
2.0
1.4
0.8
0.4
0.2
3.3
4.3
4.7
5.6
4.5
3.2
2.3
2.1
1.8
11.3
6.8
1.2
0.9
1.4
2.0
2.4
2.6
2.7
2.5
2.1
1.4
0.8
0.4
0.2
4.1
4.8
4.4
4.2
3.5
2.9
2.2
1.5
1.1
11.4
7.4
1.5
1.1
1.6
2.2
2.7
3.2
3.1
2.7
2.2
1.5
0.8
0.4
0.2
3.5
4.8
4.3
3.6
3.0
2.6
2.0
3.2
6.0
11.2
7.6
1.6
1.2
1.7
2.3
3.0
4.5
4.2
2.9
2.2
1.5
0.9
0.4
0.2
2.8
4.1
3.5
2.9
2.4
2.1
1.7
1.5
1.6
12.8
8.4
1.6
1.2
1.7
2.4
2.9
3.5
3.4
2.8
2.2
1.5
0.9
0.4
0.2
3.7
4.6
3.0
2.4
2.0
1.7
1.4
3.2
7.4
10.3
6.9
1.8
1.4
1.8
2.4
2.8
3.0
2.9
2.6
2.1
1.4
0.8
0.4
0.2
3.3
4.5
3.3
2.5
2.0
1.6
1.4
2.1
2.8
16.2
17.1
14.9
16.2
8.1
2.1
1.7
2.0
2.3
2.5
2.5
2.4
2.2
1.8
1.3
0.8
0.4
0.2
4.3
5.3
4.1
3.0
2.3
2.0
1.8
2.2
2.3
0.7
0.5
0.7
28.4
1.6
0.4
8.4
9.3
8.4
8.0
5.4
2.6
2.2
2.4
2.5
2.5
2.4
2.2
1.9
1.6
1.2
0.8
0.4
0.2
5.1
6.0
4.8
3.7
2.9
2.6
2.4
4.2
7.3
0.9
0.5
0.4
1.0
0.6
0.8
1.4
1.9
2.2
3.2
3.4
2.9
2.9
3.1
3.1
2.9
2.7
2.4
2.1
1.7
1.2
0.8
0.4
0.2
3.6
5.2
4.6
4.0
3.5
3.3
2.8
2.6
1.9
1.0
0.6
0.4
0.4
0.5
0.8
1.1
1.4
1.9
2.6
3.1
3.4
3.6
3.9
3.9
3.6
3.3
2.9
2.6
2.0
1.4
0.8
0.5
0.2
4.2
5.8
4.4
4.1
4.4
4.4
3.2
4.5
8.0
1.1
0.6
0.4
0.4
0.8
1.3
1.6
1.8
2.1
2.8
3.4
4.5
4.3
4.3
4.3
4.1
3.9
3.4
2.9
2.2
1.5
0.9
0.5
0.3
0.2
3.8
5.5
4.7
4.3
4.5
4.5
3.2
2.6
2.0
1.3
0.9
0.9
1.4
2.3
3.9
4.1
3.3
3.2
3.4
4.0
5.6
4.9
4.6
4.5
4.6
5.4
4.5
3.3
2.4
1.8
1.1
0.7
0.4
0.2
4.6
6.0
5.4
4.6
4.1
3.8
3.3
2.8
2.2
1.8
1.6
1.9
3.0
4.2
4.7
5.1
5.3
4.7
4.2
4.1
4.4
4.4
4.6
4.6
4.5
4.8
4.3
3.5
2.8
2.1
1.4
0.9
0.5
0.3
6.0
7.5
6.6
5.6
4.9
4.3
3.9
3.7
3.4
3.2
3.0
3.1
3.6
4.0
4.1
4.4
4.9
4.8
4.4
4.2
4.2
4.3
4.4
4.5
4.3
4.3
4.1
3.8
3.2
2.5
1.8
1.2
0.7
0.4
4.7
7.1
6.4
5.9
5.2
4.9
4.3
4.3
4.3
4.0
3.9
4.0
3.6
3.3
3.4
3.7
4.2
4.3
4.2
4.1
4.0
3.9
3.8
3.7
3.7
3.9
4.0
3.9
3.5
3.0
2.3
1.6
0.9
0.5
5.1
7.1
5.0
3.7
4.1
4.5
4.0
4.0
3.7
2.8
2.7
3.4
3.2
2.8
3.3
3.5
3.7
3.7
4.0
3.9
3.8
3.4
3.0
2.8
3.0
3.4
3.8
3.8
3.7
3.2
2.6
1.8
1.0
0.5
2.5
3.3
2.3
1.9
1.3
1.0
1.2
0.9
0.7
0.8
0.8
0.6
0.7
2.2
3.9
4.1
3.7
3.6
4.7
4.0
3.3
2.8
2.4
2.2
2.4
2.8
3.4
4.0
4.6
3.3
2.6
1.8
1.1
0.6
0.4
2.3
4.0
4.7
3.9
3.5
4.6
3.7
3.0
2.4
2.0
1.8
2.0
2.4
3.0
3.8
4.5
3.2
2.5
1.8
1.1
0.6
0.4
2.8
3.5
4.8
3.9
3.0
3.1
2.9
2.6
2.1
1.7
1.5
1.7
2.1
2.6
2.9
3.0
2.7
2.3
1.6
1.0
0.5
0.4
2.7
3.4
4.5
3.5
2.5
2.4
2.3
2.2
1.8
1.4
1.2
1.4
1.8
2.1
2.2
2.3
2.1
1.9
1.4
0.8
0.4
0.3
2.1
3.6
4.1
2.9
2.2
2.0
2.0
1.8
1.6
1.4
1.4
1.5
1.6
1.7
1.7
1.6
1.5
1.3
1.0
0.6
0.4
0.3
1.7
3.5
3.6
3.1
2.8
2.8
2.7
2.4
2.3
2.3
2.5
2.5
2.4
2.1
1.6
1.3
1.0
0.7
0.6
0.4
0.3
0.2
1.1
2.5
3.3
3.8
3.7
3.7
3.7
3.5
3.3
3.6
3.6
3.6
3.4
3.0
2.0
1.1
0.6
0.4
0.3
0.2
0.2
0.6
1.6
2.9
3.4
2.5
2.3
3.1
3.7
3.6
3.8
2.9
2.2
2.9
3.2
2.0
0.9
0.4
0.2
0.2
0.2
0.5
0.8
0.7
1.0
1.0
0.8
1.0
1.0
1.0
1.0
1.2
1.0
0.9
0.6
0.3
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
39.0
M1 @ 11' 6" M1 @ 11' 6"
X3 @ 20'
Z1 @ 4' 6"
Z1 @ 4' 6"
Z1 @ 4' 6"
Z1 @ 4' 6"
Z1 @ 4' 6"
Z1 @ 4' 6"
Z1 @ 4' 6"
Z1 @ 4' 6" Z1 @ 4' 6" Z1 @ 4' 6" Z1 @ 4' 6" Z1 @ 4' 6" Z1 @ 4' 6"
M2 @ 8'
M2 @ 8'
M1 @ 13' 6"
M1 @ 13' 6"
M1 @ 13' 6"
M1 @ 13' 6"
M1 @ 13' 6"
M1 @ 13' 6" M1 @ 13' 6" M1 @ 13' 6"M1 @ 13' 6"
G6 @ 10' G6 @ 10' G6 @ 10'
G6 @ 10' G6 @ 10' G6 @ 10'
G6 @ 10'
X1 @ 20' X1 @ 20' X1 @ 20' X1 @ 20' X1 @ 20'
X3 @ 20'
X3 @ 20'
B1 @ 11' 6" B1 @ 11' 6" B1 @ 11' 6" B1 @ 11' 6"
B1 @ 11' 6"
B1 @ 11' 6"
B1 @ 11' 6"
B1 @ 11' 6"
B1 @ 11' 6"
B1 @ 11' 6" B1 @ 11' 6" B1 @ 11' 6"
X3H @ 20'
X3H @ 20'
X3H @ 20'
X3H @ 20'
X3H @ 20'
X5 @ 20'
X5 @ 20'
X5 @ 20'
X5 @ 20'
X5 @ 20'
X5 @ 20'
X5 @ 20'
Plan View
Scale - 1" = 20ft
Schedule
Label Manufacturer Description LLF Input
Power
M1
6x18 up_down cylinder - VR15, 4000K,
90CRI 25 degree
0.9 22.2 M2
Cree Lighting, Lighting
Module
'2000lm' Puck With Flat Diffuse Plastic Lens 0.9 24.4 B1
COOPER LIGHTING
SOLUTIONS - McGraw-
Edison
GEKKO WALL PACK 4000LM PACKAGE
70CRI 4000K FIXTURE w/ TYPE III
DISTRIBUTION OPTIC
0.9 26.5
G6
PRESCOLITE 6" LiteFrame Round Shallow Downlight,
2000 lumens, 4000K, 80+CRI, Medium,
Specular Clear
0.9 16.43
Z1
WILLIAMS OUTDOOR LED 835cct 0.9 27.1
X1
Spring City Electrical
Manufacturing Co
Cast aluminum housing, frosted glass lens
enclosure with a luminum top
0.9 120
X3
COOPER LIGHTING
SOLUTIONS - McGRAW-
EDISON (FORMERLY
EATON)
GALLEON AREA AND ROADWAY LUMINAIRE
(2) 70 CRI, 4000K, 615mA LIGHTSQUARES
WITH 16 LEDS EACH AND TYPE III OPTICS
0.9 63
X3H
COOPER LIGHTING
SOLUTIONS - McGRAW-
EDISON (FORMERLY
EATON)
GALLEON AREA AND ROADWAY LUMINAIRE
(3) 90 CRI, 4000K, 615mA LIGHTSQUARES
WITH 16 LEDS EACH AND TYPE III OPTICS
WITH HOUSE SIDE SHIELD
0.9 93
X5
COOPER LIGHTING
SOLUTIONS - McGRAW-
EDISON (FORMERLY
EATON)
GALLEON AREA AND ROADWAY LUMINAIRE
(3) 90 CRI, 4000K, 1200mA
LIGHTSQUARES WITH 16 LEDS EACH AND
TYPE V WIDE OPTICS
1 184
Note
1. ALL PARKING AREA FIXTURES ( EXCLUDING TYPE X1) TO BE
PROVIDED WITH INTEGRAL OCCUPANCY SENSOR AND 30%
DIMMING CONTROL.
Page 24 of 40
EL. 100'-0"
FIRST FLOOR
EL. 114'-8"
SECOND FLOOR
EL. 132'-0"
T/ WALL
EL. 129'-0"
T/ WALL
EL. 132'-0"
T/ WALL
EL. 118'-8"
T/ WALL
STONE VENEER
(TYP.)
METAL WALL PANEL
(TYP.)
METAL WALL PANEL
(TYP.)
METAL WALL PANEL
(TYP.)
BRICK VENEER
(TYP.)
ALUMINUM STOREFRONT
(TYP.)
STONE SILL
(TYP.)
ALUMINUM CURTAIN WALL
(TYP.)
EL. 138'-0"
T/ SCREEN WALL METAL WALL PANEL
(TYP.)
METAL GUARD RAIL
(TYP.)
METAL WALL PANEL
(TYP.)
EL. 116'-0"
T/ WALL
© Somerville, Inc.
NEW CITY HALL
2/2/2026 7997
CITY OF STEVENS POINT
2026
SCALE: 1/8" = 1'-0"
WEST ELEVATION - NO INDOOR PARKING OPTION
SCALE: 1/8" = 1'-0"
NORTH ELEVATION - NO INDOOR PARKING OPTION
SCALE: 1/8" = 1'-0"
EAST ELEVATION - NO INDOOR PARKING OPTION
SCALE: 1/8" = 1'-0"
SOUTH ELEVATION - NO INDOOR PARKING OPTION
HISTORIC IMAGE
HISTORIC IMAGE
Page 25 of 40
© Somerville, Inc.
NEW CITY HALL
2/2/2026 7997
CITY OF STEVENS POINT
2026
NORTHWEST PERSPECTIVE
SOUTHWEST PERSPECTIVE
NORTHEAST PERSPECTIVE
SOUTHEAST PERSPECTIVE
Page 26 of 40
EL. 100'-0"
FIRST FLOOR
EL. 114'-8"
SECOND FLOOR
EL. 132'-0"
T/ WALL
EL. 129'-0"
T/ WALL
EL. 132'-0"
T/ WALL
EL. 118'-8"
T/ WALL
EL. 114'-8"
T/ WALL
STONE VENEER
(TYP.)
METAL WALL PANEL
(TYP.)
METAL WALL PANEL
(TYP.)
METAL WALL PANEL
(TYP.)
BRICK VENEER
(TYP.)
STONE SILL
(TYP.)
ALUMINUM CURTAIN WALL
(TYP.)
ALUMINUM STOREFRONT
(TYP.)
EL. 138'-0"
T/ SCREEN WALL METAL WALL PANEL
(TYP.)
METAL GUARD RAIL
(TYP.)
METAL WALL PANEL
(TYP.)
EL. 116'-0"
T/ WALL
© Somerville, Inc.
NEW CITY HALL
2/2/2026 7997
CITY OF STEVENS POINT
2026
SCALE: 1/8" = 1'-0"
WEST ELEVATION - WITH INDOOR PARKING OPTION
SCALE: 1/8" = 1'-0"
NORTH ELEVATION - WITH INDOOR PARKING OPTION
SCALE: 1/8" = 1'-0"
EAST ELEVATION - WITH INDOOR PARKING OPTION
SCALE: 1/8" = 1'-0"
SOUTH ELEVATION - WITH INDOOR PARKING OPTION
Page 27 of 40
© Somerville, Inc.
NEW CITY HALL
2/2/2026 7997
CITY OF STEVENS POINT
2026
NORTHWEST PERSPECTIVE
SOUTHWEST PERSPECTIVE
NORTHEAST PERSPECTIVE
SOUTHEAST PERSPECTIVE
Page 28 of 40
Page 29 of 40
Page 30 of 40
Page 31 of 40
Page 32 of 40
Page 33 of 40
LIBRARY
OFFICE
MAIL
STAIR
CLOSED
MEETINGS
MECHANICAL
ELEV
8 PARKING STALLS
8 PARKING STALLS (2 HANDICAP)
VESTIBULE
VESTIBULE
SMALL
CONFERENCE
ROOM
VOTE
ROOM
SECURE
STORAGE
LOCK/LTE
OPEN
WORK
AREA
WOMEN'S
TOILET
MEN'S
TOILET
STORAGE
CLERK
PARKING
MUNICIPAL
COURT /
COUNCIL
CHAMBERS
PUBLIC WORKS
COMMUNITY AND
ECONOMIC DEVELOPMENT
OFFICE
OFFICE
JAINTOR
CLOSET
OFFICE
PUBLIC
CONFERENCE
ROOM
OPEN
WORK
AREA
WOMEN'S
TOILET
MEN'S
TOILET
TREASURY
RECEPTION
STORAGE LAYOUT/
PRINT AREA
OFFICE
OFFICE
OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE
OFFICE OFFICE OFFICE OFFICE OFFICE
OFFICE
OFFICE
STORAGE
OPEN
WORK
STATIONS
OFFICE
LAYOUT/
PRINT AREA
RECEPTION
STORAGE
SEATING FOR APPROX.
100 PEOPLE
OFFICE
SECURE
STORAGE
MUNICIPAL
COURT
CONTROL
ROOM
CONFERENCE
ROOM
PUBLIC
CONFERENCE
ROOM
OFFICE
OFFICE
MEETING
AREA
SMALL
CONFERENCE
ROOM
ELECTRCIAL
MECHANICAL ENCLOSURE
TOILET
CITY ATTORNEY
CITY VEHICLE PARKING
CLERK
COMMUNITY AND ECONOMIC DEVELOPMENT
CORRIDOR
FIRE DEPT.
IT DEPT.
MAYOR'S OFFICE
MECHANICAL
MUNICIPAL COURT
PERSONNEL / HR
POLICE DEPT.
PUBLIC WORKS
SHARED STAFF AREAS
TOILET ROOM
TREASURY
WATER STREET ENTRY
ELLIS STREET ENTRY
LOBBY
CORRIDOR
UP
UP
RECEPTION
DESK
RECEPTION
DESK
RECEPTION
DESK
RECEPTION
DESK
RECEPTION
DESK
© Somerville, Inc.
NEW CITY HALL
2/2/2026 7997
CITY OF STEVENS POINT
2026
NSCALE: 1/8" = 1'-0"
FIRST FLOOR PLAN
FIRST FLOOR 23,100 SF
GARAGE 6,371 SF
SECOND FLOOR 8,866 SF
TOTAL: 38,337 SF
Page 34 of 40
OFFICE
OFFICE OFFICE
CHECK-IN
WINDOW
(FUTURE
OFFICE)
STORAGE
STAFF
BREAKROOM
STAIR
CORRIDOR
OPEN TO
BELOW
OPEN TO
BELOW
ROOF AREA
ROOF AREA
OPTIONAL ROOF PATIO
CITY ATTORNEY
CITY VEHICLE PARKING
CLERK
COMMUNITY AND ECONOMIC DEVELOPMENT
CORRIDOR
FIRE DEPT.
IT DEPT.
MAYOR'S OFFICE
MECHANICAL
MUNICIPAL COURT
PERSONNEL / HR
POLICE DEPT.
PUBLIC WORKS
SHARED STAFF AREAS
TOILET ROOM
TREASURY
JANITOR
CLOSET
FITNESS
ROOM
PHYSICAL /
FIRST AID
ROOM
PHYSICAL
ROOM
WALKWAY
WORK
BENCH
OFFICE
OFFICE
WAITING
ROOM
CORRIDOR
ROOF AREA
ELEV
IT DEPT.
HUMAN
RESOURCES
CITY ATTORNEY
MAYOR
MEN'S
TOILET
WOMEN'S
TOILET
SHOWER
ROOM
IT STOR
CONFERENCE
DATA
ROOM
CONFERENCE
ROOM
WELLNESS
ROOM
SMALL
CONFERENCE
OFFICE
(FUTURE
OFFICE)
STORAGE
WORK
ROOM
ROOF AREA
DOWN
DOWN
MECHANICAL AREA
MECHANICAL AREA
© Somerville, Inc.
NEW CITY HALL
2/2/2026 7997
CITY OF STEVENS POINT
2026
SCALE: 1/8" = 1'-0"
SECOND FLOOR PLAN N
FIRST FLOOR 23,100 SF
GARAGE 6,371 SF
SECOND FLOOR 8,866 SF
TOTAL: 38,337 SF
Page 35 of 40
Page 36 of 40
Page 37 of 40
Page 38 of 40
Page 39 of 40
Page 40 of 40
Source: City of Stevens Point website. First collected Oct 30, 2026.