RecordWell Data

Joint Plan Commission & Historic Preservation / Design Review Commission — Agenda Packet

City of Stevens Point · Portage County · City Plan Commission · meeting of Feb 2, 2026 · Agenda packets

Open the original document More from City of Stevens Point

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Date and Time: February 2, 2026 5:00 PM Our intention is to have in-person meetings going forward. For the time being, we will hold the City Committee Meetings, Plan Commission, Council and most others at the Community Room at 933 Michigan Avenue. This in-person location will meet the legal requirement for our open meetings. We will have a virtual option available, but the technology for the hybrid style meeting may not be reliable all of the time. AGENDA JOINT CITY PLAN COMMISSION & HISTORIC PRESERVATION / DESIGN REVIEW COMMISSION Location: Community Room Members • Mayor Wiza • Alderperson Kneebone • Commissioner Arntsen • Commissioner Beacom • Commissioner Rice • Commissioner Schade Stroik • Commissioner Schuler • Chair Tim Siebert • Vice Chair Peter Munck • Alderperson Marc Christianson • Barry Calnan • Carol Molepske • Janet Jurgella Finn (Alternate 1) • Dan Kryst (Alternate 2) 933 Michigan Avenue, Stevens Point, WI OR Zoom Teleconferencing Meeting ID: 890 7161 8611 Passcode: 584895 By Computer: https:// us02web.zoom. us/j/89071618611 ?pwd=LQTm 7Qx9xE Nvas8G By Phone: +1-312-626-6799 (US Chicago) Opening Section: 1. Roll Call Discussion and Possible Action on: 2. Presentation by Somerville Architects on the proposed City Hall Campus. 3. A request from the City of Stevens Point for a design review to construct a principal structure, parking lot and associated site improvements on an unaddressed parcel bounded by Water Street and Ellis Street (Parcel ID 281240832202055), consistent with Ch. 22.05(2). 4. A request from the City of Stevens Point for a site plan review to construct a principal structure, parking lot and associated site improvements on an unaddressed parcel bounded by Water Street and Ellis Street (Parcel ID 281240832202055). Closing Section: 5. Adjourn Page 1 of 40 Page 2 of 40 Page 1 of 9 Administrative Staff Report Department of Community Development 1515 Strongs Avenue, Stevens Point, WI 54481 Ph: (715) 346-1568 - Fax: (715) 346-1498 Design Review & Site Plan Review City Hall – Bounded by Ellis & Water Street February 2, 2026 Applicant(s): • City of Stevens Point Staff: • Adam Kuhn, Associate Planner akuhn@stevenspoint.com Parcel Number(s): • 281240832202055 Zone(s): • “B-3” Central Business District Council District: • District 9 – Ald. Lang Planned Use: • City Hall Applicable Regulations: • Chapter 22 – Historic Preservation Ordinance • Downtown Design Guidelines • Chapter 23 – Zoning Ordinance Request A request from the City of Stevens Point for a design review to construct a principal structure, parking lot and associated site improvements on an unaddressed parcel bounded by Water Street and Ellis Street (Parcel ID 281240832202055), consistent with Ch. 22.05(2). A request from the City of Stevens Point for a site plan review to construct a principal structure, parking lot and associated site improvements on an unaddressed parcel bounded by Water Street and Arlington Ellis Street (Parcel ID 281240832202055). City Official Design Review / Historic District 1. Downtown Historic Design Review District Staff Recommendation Approve the request for a design review to construct a principal structure, parking lot and associated site improvements on an unaddressed parcel bounded by Water Street and Ellis Street (Parcel ID 281240832202055), subject to the following conditions: 1. A building permit shall be obtained prior to the start of construction. 2. The Designated Agent shall have the authority to approve minor amendments to the plan set. Approve the request for a site plan review to construct a principal structure, parking lot and associated site improvements on an unaddressed parcel bounded by Water Street and Arlington Ellis Street (Parcel ID 281240832202055), subject to the following conditions: 1. A building permit shall be obtained prior to the start of construction. 2. The Designated Agent shall have the authority to approve minor amendments to the plan set. Page 3 of 40 Page 2 of 9 Vicinity Map Scope of Work Overview: As Commissioners are aware, the City has been exploring the idea of relocating City Hall operations away from the Portage County Courthouse building into a new space. After discussion, the Council last year elected to construct a new City Hall building on the site identified in the vicinity map above. The subject area is located within the Downtown Design Review District – one of three historic districts located within the city. Properties identified in a local historic district, or applied a local landmark designation, must adhere to the Historic Preservation / Design Review Commission’s Design Guidelines when building and site improvements are requested. According to Section 7.4 of the Historic Preservation / Design Review Commission’s Design Guidelines, new construction is considered a ‘major work’ and requires the review and approval of the Commission. Said requirement is outlined below. Sec. 7.4: Major and Minor Works Sec. 7.4.1 Major Works (HPDRC Approval) a. New construction or additions to primary buildings The process to obtain a design review from the Historic Preservation / Design Review Commission is identified below. CHAPTER 22: HISTORIC PRESERVATION Division 5.02 Regulation of Construction, Reconstruction, Alteration, and Demolition Page 4 of 40 Page 3 of 9 No owner or person in charge of a historic structure or historic site, or property located within a historic district shall reconstruct, alter, or demolish all or any part of the exterior of such property or construct any improvement upon such designated property or properties or cause or permit any such work to be performed upon such property or demolish such property unless approval has been granted by the commission. Upon the filing of any request for a design review certificate with the commission, the commission shall review the request in accordance with the design guidelines. If the commission determines that the application for a design review certificate and the proposed changes are consistent with the design guidelines, it shall issue the design review certificate. Upon the issuance of such certificate, any other required permits shall be obtained. Within this agenda is a request for the City’s Plan Commission to conduct a site plan review of the proposed building and site development. Although action by the Plan Commission is not required per the City’s Zoning Code, City Administration requested that the Plan Commission provide input on the proposed site design. An analysis of relevant site design standards is highlighted below, based on the enclosed plan submittal. As is addressed throughout this report, the plan submittal includes options to include and not include an enclosed parking area that is attached to the City Hall building. This report examined both design options; however, it will be up to the Common Council in the weeks ahead as to whether an enclosed parking area is included in the final plans for bid. HPDRC Guidelines of Review (numbers below pertain to the pertinent guideline standards) ***Other standards within the design guidelines not specifically mentioned below have been reviewed and are met or not applicable pertaining to the proposed building improvement activities. SEC. 5.1.2: Commercial Construction: Massing, Scale & Orientation Guidelines 1. Buildings within Stevens Point's Downtown Historic / Design Review District are of similar heights. Therefore, Site & Landscaping Plan – No Enclosed Parking Area Site & Landscaping Plan – Including an Enclosed Parking Area Page 5 of 40 Page 4 of 9 the height of a new building should be compatible with other buildings in the district when measured from grade. Analysis: The proposed building would stand two stories in height at a peak height of 38 feet. Adjacent buildings range from being single-story (e.g., Children’s Wisconsin & the Beth Israel Synagogue) to five stories in height (e.g., Berkshire). Findings: The proposed two-story building would a comparable height to neighboring buildings and serve as a gradual increase in peak building height from the south to the Downtown area. 2. All new buildings should be compatible in height with adjacent buildings on the block. Analysis: Please see standard #1 above. Findings: This standard is met. 3. A new building’s height to width ratio should be consistent with existing historic structures. Floor-to-floor heights of new buildings should be similar to the proportions of the existing. Analysis: The proposed building would stand 38 feet in height. A maximum building width of 197 feet would exist if an enclosed parking area were not added onto the building. If the enclosed parking area is added onto the building, maximum building width would be 218 feet. Findings: The building has a proposed square look to it that is similar with other multi-story buildings located in the near vicinity (e.g., Berkshire, Courthouse, etc.). 4. The overall building massing and placement on the lot should be similar to that of other buildings in the historic district. Commercial buildings within the interior of the block should be built to the front property line resulting in a continuous building line. Analysis: A building setback of 66 feet is proposed off of Water Street. Adjacent buildings range significantly in terms of the amount of building setback provided from a street. The Berkshire building provides roughly four feet of street setback off of Water Street, 18 feet provided for the Beth Israel Synagogue, and 13 feet for the Portage County Annex building. A greater street setback is being requested for City Hall due to the amount of visitor traffic coming in and out of the site, and ensuring that parking accommodations in close proximity can be provided. Additionally, the building is requested to be set back farther to preserve an open space area adjacent to Water Street. 5. The space between buildings should reflect the existing pattern of property development within the district. Historically, buildings within the interior of a block were built to the side property line, usually sharing a wall with its neighbor. Analysis: Ten feet of side yard setback is provided from the northwest lot line. Findings: While it is common for buildings along Main Street and Clark Street to share a common wall along the Page 6 of 40 Page 5 of 9 side lot line, buildings on the periphery of the Downtown provided greater separation from one another. The proposed side yard setback allows for the minimum number needed to satisfy Building Code requirements, while ensuring that it still meets the spirit of buildings in a historic district to be close to one another. 6. Where buildings are set back from the front property line, the parking should be to the side and rear only. Analysis: Parking is provided in the front, side and rear elevations of the building. Findings: As part of this request, the City is requesting a deviation from this standard to allow for parking closer to the street lot line. 7. New buildings should have their main entrance and primary architectural façade facing the street. New buildings should have a rear entrance to accommodate rear parking and access. Analysis: The main entrance is proposed to be off of Water Street, with secondary employee only access along the north elevation. Primary architectural details are located along the front elevation – ranging with the use of brick veneer, metal wall panel and stone veneer. Findings: This standard is met. SEC. 5.1.3: Commercial Construction: Design, Proportion & Architectural Guidelines 1. The design of a new building should not attempt to create a false historic appearance, but rather complement buildings in the existing district. New construction should have its own character and style. Analysis: The proposed building aims to be compatible with the Weber Tackle Building that was historically located on the subject area. As shown within the elevation plans, the proposed building complements key features of the Weber Tackle Building – the use of brick veneer and a fenestration pattern that has a similar ratio of solids and voids – to present an industrial feel for a building that will house an institutional use. Findings: Staff believes that this standard is met. Page 7 of 40 Page 6 of 9 2. Use materials that are common to the district such as brick, stone, terra cotta, wood, and metal. Modern materials are appropriate on a new building, however, masonry should be the predominant material on the façade as most of downtown’s historic structures are brick or stone. Whenever modern materials are used, they should be similar in their physical qualities to historic materials found in the district. Analysis: Brick veneer is the predominant façade material used on the proposed building, with other materials used consisting of metal and stone. Findings: This standard is met. 3. The fenestration of a new building should reflect that of existing historic structures within the district in proportion, shape, location, pattern and size. The ratio of solids to voids on a building’s façade should reflect the buildings within the same block. Analysis: Please see standard #1 above. Findings: The proposed fenestration pattern is consistent with other buildings located in the near vicinity, particularly more modern buildings (e.g., Berkshire) located within the Downtown Design Review District. 4. New construction should include storefront elements proportional to that of existing historic structures. Analysis: Storefront elements are not proposed due to the institutional use proposed within the building. Findings: This standard is met. 5. Aluminum and vinyl siding are not recommended on new construction within the Downtown Historic / Design Review District. Analysis: Aluminum is the proposed material for the window muntins. Vinyl siding is not proposed. Findings: While aluminum is proposed for the windows, its feature is small in scale compared to the other façade materials that would be used. 6. Architectural details such as cornices, arches, and parapet walls give a building texture and define its scale. New construction should reflect that of existing structures. The orientation and pattern of windows, doors, and architectural details can help reduce the impact to new construction. Analysis: A parapet wall and metal guard rail are proposed to provide greater variation in true building height. Finding: This standard is met. SEC. 3.14: Mechanical and Communication Equipment 4. Mechanical equipment including utility meters and heating and air conditioning equipment should be located at the rear of a structure if feasible. Mechanical equipment which can be seen from the street should be screened with shrubbery or appropriate fencing. Analysis: Mechanical equipment is proposed on the roof of the building, which would be shielded from public view via privacy fencing. Findings: This standard is met. SEC. 4.1: Landscaping Guidelines 4. When adding new landscaping, native and commonly occurring vegetation is recommended. New plant materials should be appropriate in species and scale to existing plant materials in the immediate vicinity. Analysis: The submitted landscaping plan proposes a range of 40’ tall trees, 3-4’ tall shrubs, ornamental grasses Page 8 of 40 Page 7 of 9 and perennials. The landscaping is located primarily within landscaped areas within the parking lot and along the perimeter of the building. Findings: This standard is met. 5. Shrubbery planted along building edges and property lines should have a mature height of less than six (6) feet. Analysis: Most shrub species are proposed to be 3-4’ in height, with the exception of Techny Arborvitae that would stand 10-15’ tall at maturity. These shrubs would be located near the southeast corner of the subject area. Findings: As part of this request, an exception is being sought to allow for a taller shrub to provide separation between the City Hall building and the Beth Israel Synagogue. 6. Trees, shrubs, and fencing should be used to screen service areas, garbage enclosures and, whenever possible, parking areas. Analysis: Trees and shrubs are located within the parking lot in accordance with the City’s Zoning Code. Findings: This standard is met. SEC. 4.2: Lighting Guidelines 1. The design of lighting fixtures and poles should be compatible in size, scale, material, and brightness with the structure, landscape, and neighborhood setting. Analysis: Bollards are proposed to be located throughout the parking lot at a height of 30 inches from grade. Findings: The proposed bollards have a more pedestrian feel given their short height and best assimilates with the broader historic district by ensuring that it complements adjacent site designs. SEC. 4.3.1: Parking Lot Guidelines 1. Parking lots, driveways, and sidewalks shall comply with any ordinance requirements for size and landscaping elements as well as site grading. Analysis: The parking lot satisfies minimum design standards as outlined in the City’s Zoning Code. Findings: This standard is met. 4. Large expanses of parking are not recommended. Parking should be adequately landscaped with buffers and vegetative islands. Pedestrian access and crossings should be clearly designated in parking areas. Analysis: The parking lot is broken up by terminal landscaped islands as required in the City’s Zoning Code. Perimeter landscaping is also proposed. Findings: This standard is met. 6. Commercial parking areas should be surfaced with suitable materials such as asphalt, concrete, brick, etc. Gravel, crushed stone, or other loose material including unpaved lots are not recommended. Analysis: The parking lot would comprise of asphalt. Findings: This standard is met. Page 9 of 40 Page 8 of 9 Site Plan Review 1. Setbacks. Analysis: The subject area is zoned “B-3” Central Business District. Within the “B-3” District, there are no street, side and rear setback requirements. Findings: The setbacks that are provided exceed minimum requirements for the “B-3” District. Lot Line B-3 Setback Requirements Proposed Setbacks – No Enclosed Parking Proposed Setbacks – Enclosed Parking Street 0 feet 66’ off of Water Street, 101’ off of Ellis Street 66’ off of Water Street, 101’ off of Ellis Street Side 0 feet 10’ off of northwest lot line, 147’ off of southeast lot line 10’ off of northwest lot line, 127’ off of southeast lot line Rear 0 feet 150’ 99’ 2. Density. Analysis: Within the “B-3” District, permitted commercial land uses do not have a minimum lot size requirement. Findings: As the subject property is 128,851 square feet in size, the proposed use meets minimum density restrictions. 3. Building Height. Analysis: The proposed structure will be 38 feet tall. Findings: Buildings within the “B-3” District are restricted to a max height of 35 feet. Structures may surpass 35 feet in height, at a height not to exceed 85 feet, if a fire prevention system exists that is approved by the Fire Department. The proposed structure would be equipped with a fire prevention system. 4. Parking and Traffic Flow. Analysis: As the subject property is zoned “B-3” Central Business District, minimum off-street parking requirements identified in the Zoning Code are waived. With the enclosed garage, the proposal seeks 72 surface parking stalls and 15 indoor parking stalls. Without the enclosed garage, the proposal seeks 87 surface parking stalls. One access point is proposed off Ellis Street, Arlington Place and Water Street. Findings: The number of parking stalls provided aligns with the number of City employees who would work in the building, along with providing ample visitor parking areas for peak times of the year (e.g., committee meetings, tax payments, etc.). With access points off of each adjoining public street, staff believes that traffic circulation is sufficient within and around the site. 5. Utilities. Page 10 of 40 Page 9 of 9 Analysis: Utility infrastructure exists within the adjacent street right-of-way to accommodate the proposed development. Infiltration basins are proposed along the south and east lot lines. Public Utilities staff have reviewed the proposed stormwater facilities and believes that it can handle anticipated stormwater flow as a result of the proposed development. Findings: This standard is met. 6. Landscaping. Analysis: The submitted landscaping plan proposes a range of 40’ tall trees, 3-4’ tall shrubs, ornamental grasses and perennials. The landscaping is located primarily within landscaped areas within the parking lot and along the perimeter of the building. Findings: Based on the landscaping plan submitted, City staff believes that it meets minimum landscaping requirements as outlined within the Zoning Code. Page 11 of 40 HISTORIC PRESERVATION/ DESIGN REVIEW COMMISSION City of Stevens Point Community Development Department 1515 Strongs Avenue, Stevens Point, WI 54481 W͗(715) 346-1567 &͗(715) 346-1498 communitydevelopment@stevenspoint.com http://stevenspoint.com Application for Design Review Page 1 of 2 APPLICATION FOR DESIGN REVIEW ADMINISTRATIVE SUMMARY (Staff Use Only) Application # Date Submitted Assigned Case Manager Associated Permits or Applications (if any) Pre-Application Conference Date Decision Date Reviewed Staff Signature Notes: APPLICANT/CONTACT INFORMATION APPLICANT INFORMATION CONTACT INFORMATION (Same as Applicant? ) Applicant Name Contact Name Address Address City, State, Zip City, State, Zip Telephone Telephone Fax Fax Email Email OWNERSHIP INFORMATION PROPERTY OWNER OF RECORD 1 INFORMATION (Same as Applicant? ) PROPERTY OWNER OF RECORD 2 INFORMATION (If Needed) Owner’s Name Owner’s Name Address Address City, State, Zip City, State, Zip Telephone Telephone Fax Fax Email Email PROJECT SUMMARY Subject Property Location [Please Include Address and Assessor’s Identification Number(s)] Parcel 1 Parcel 2 Parcel 3 Legal Description of Subject Property Area of Subject Property (Acres/Sq Ft) Area of Building or Structure (Sq Ft) City of Stevens Point Jarod Kivela 1515 Strongs Ave 1515 Strongs Ave Stevens Point, WI 54481 Stevens Point, WI 54481 715-346-1570 715-346-1567 jkivela@stevenspoint.com City of Stevens Point 1515 Strongs Ave Stevens Point, WI 54481 715-346-1570 1039 Ellis Street (Parcels being combined; see CSM) Lot 1 of Portage County Certified Survey Map Number 012080, located in Government Lot 2 of Section 32, Township 24 North, Range 8 East, City of Stevens Point, Portage County, Wisconsin. 2.958 acres (128,851 sqft) Approx 38,000 sqft primary structure (additional may be added if garage is constructed). Page 12 of 40 Application for Design Review Page 2 of 2 Current Zoning District(s) Current Historic District(s) - Local, State, National Designated Future Land Use Category Current Use of Property Proposed Use of Property Briefly describe the proposed building, structure construction, reconstruction or exterior alteration. Please also provide rationale for the design review request, along with the time schedule (if any) for the project. (Use additional pages if necessary) Will the proposed work detrimentally change, destroy or adversely affect any exterior architectural features of the improvement upon which said work is to be done? Explain you answer. Does the proposed work match and harmonize with the external appearance of adjacent neighboring improvements. Explain your answer. Does the proposed work conform to the objectives of the historic preservation plan for said district (if any)? Explain you answer. Does the proposed work conform with the architectural design guidelines with emphasis on contextual issues including compatibility of size, volume proportions, rhythm, materials, detailing, colors, and expressiveness? (Historic Design Guidelines can be found at www.stevenspoint.com) Explain you answer. EXHIBITS Letter to District Alderperson (www.stevenspoint.com/Directory) Additional Exhibits If Any (List): Photographs of Building or Structure Renderings or Elevations Site Plan (for additions, and new construction) CERTIFICATION AND SIGNATURE By my signature below, I certify that the information contained in this application is true and correct to the best of my knowledge at the time of the application. I acknowledge that I understand and have complied with all of the submittal requirements and procedures and that this application is a complete application submittal. I further understand that an incomplete application submittal may cause my application to be deferred to the next posted deadline date. Signature of Applicant Date Signature of Property Owner(s) Date pp ϭͬϮϲͬϮϲ ϭͬϮϲͬϮϲ^ĞĞĂƚƚĂĐŚĞĚĞŵĂŝůĨŽƌDĂLJŽƌĂƉƉƌŽǀĂů B3 - Central Business District (Future Zoning of "Institutional") Downtown Design Review District Downtown District Vacant/Storage for Portage County - Building Being Razed City of Stevens Point City Hall Offices See attached document See attached document See attached document See attached document See attached document CSM, Landscaping plan and lighting plan. Note: sample materials will be available at the meeting. ✔ ✔ Page 13 of 40 Briefly describe the proposed building, structure construction, reconstruction or exterior alteration. Please also provide rationale for the design review request, along with the time schedule (if any) for the project. (Use additional pages if necessary) The proposed project includes the construction of a new City Hall building at 1039 Ellis Street (may be readdressed). The existing structure on the property is currently being demolished. Following completion of the demolition, a new municipal facility will be constructed on site (closer to Water Street). The proposed building is intended to meet modern City Hall operational needs while reinforcing the architectural character of the Downtown Design Review District. The new building design is being developed to pay homage to the original Weber Tackle (Weber Lifelike Fly) building that historically occupied the site (the Frost Fishing Tackle Company was purchased by Weber Tackle in 1926 and moved to this location in 1928). Since the construction of the original Weber Tackle building, numerous additions were made, and substantial exterior changes occurred over time, resulting in the loss of much of the building’s historic architectural image. Most notable was the covering of the original brick and windows with EIFS-type material. With the existing structure being razed, the proposed City Hall design will reference historic photographs and incorporate materials and architectural elements reflective of the original building’s character. Proposed features include brick façades with soldier coursing, brick lintels, and other traditional architectural detailing, as well as large, tall windows that mimic the scale and proportions of the original structure’s openings and enhance the building’s street presence. While the design incorporates historic-inspired elements, it also introduces complementary contemporary materials to support a modern and timeless civic facility. This includes the incorporation of Corten steel, referencing the “POINT” sign on the north side of the community and other civic art elements in Stevens Point, along with a white brick/stone palette that works cohesively with the Bedford limestone found on many downtown buildings (Sentry). These elements will be brought together with a solid, dark metal trim system to provide a cohesive, durable, and timeless finish. This design review request is being submitted to confirm that the proposed City Hall design aligns with the intent of the Downtown Design Review District. As a public building and long-term civic investment, the City and its design team are focused on creating a facility that both honors the history of the site and contributes a high-quality, functional, and lasting addition to the downtown environment. Page 14 of 40 Tentative Project Timeline: o Completion of construction plans: early April o Council authorization to bid: April 20 o Bid opening/closing: May 12 o Council consideration/award of construction contract: June 1 o Anticipated construction start: June or early July Will the proposed work detrimentally change, destroy or adversely affect any exterior architectural features of the improvement upon which said work is to be done? Explain you answer. No. The proposed work will not detrimentally change, destroy, or adversely affect exterior architectural features of the existing improvement because the current structure has already been substantially altered over time and no longer retains intact, character- defining historic exterior features. The existing building is being demolished as part of an approved redevelopment plan, and the proposed project involves new construction rather than rehabilitation of the existing façade. The new City Hall design is intended to enhance the architectural character of the site by incorporating historically inspired materials and detailing that pay tribute to the original Weber Tackle building while meeting modern standards and the intent of the Downtown Design Review District. Does the proposed work match and harmonize with the external appearance of adjacent neighboring improvements. Explain your answer. Yes. The proposed building is designed to match and harmonize with the external appearance of adjacent and nearby downtown improvements through its use of durable, high-quality materials and architectural detailing that reflects the traditional character of the area. The design incorporates brick façade elements, window proportions, and historic- inspired features that are consistent with the scale and rhythm found throughout the downtown district. In addition, complementary modern materials such as corten steel and lighter masonry/stone elements are being incorporated in a way that remains cohesive with surrounding buildings and the broader Downtown Design Review District standards. Overall, the proposed City Hall will reinforce the established architectural character of the neighborhood while providing a modern, timeless civic building that fits within its context. Does the proposed work conform to the objectives of the historic preservation plan for said district (if any)? Explain you answer. Page 15 of 40 Yes. The proposed work conforms to the objectives of the Historic Preservation Plan for the district because it is designed to respect and reinforce the historic character of the downtown area, even though the existing structure on the site has lost most of its original historic integrity due to extensive modifications over time. The proposed City Hall will incorporate historic-inspired architectural elements, including traditional masonry materials, brick detailing (such as soldier coursing and lintels), and vertically proportioned window openings, to reflect the character of the original Weber Tackle-era building and the broader downtown building patterns. In addition, the project supports the intent of historic preservation planning by promoting context-sensitive new construction that complements surrounding development, contributes to a cohesive streetscape, and acknowledges the community’s industrial heritage while providing a functional, long-term civic facility. Does the proposed work conform with the architectural design guidelines with emphasis on contextual issues including compatibility of size, volume proportions, rhythm, materials, detailing, colors, and expressiveness? (Historic Design Guidelines can be found at www.stevenspoint.com) Explain you answer. Yes. The proposed City Hall design is intended to conform with the architectural design guidelines and emphasizes contextual compatibility with the Downtown Design Review District. The building’s overall massing and proportions are being designed to fit within the scale of surrounding downtown development, with strong façade details and large window openings to establish an appropriate rhythm along the street. The project incorporates durable, high-quality materials, most notably traditional masonry/brick, along with historic- inspired detailing such as brick soldier coursing and lintels to reflect the architectural character found throughout the district and to pay tribute to the original Weber Tackle-era building on the site. In addition, the proposed material choices and exterior finishes are intended to be cohesive with nearby downtown structures by incorporating complementary elements such as lighter masonry/stone tones consistent with existing limestone features downtown, balanced with modern accents like Corten steel and a timeless dark metal trim. Overall, the design blends historic reference points with contemporary civic architecture in a way that supports compatibility in size, volume, rhythm, materials, detailing, and overall visual expression, consistent with the intent of the City’s architectural design guidelines. Page 16 of 40 PROPOSED CITYHALL BUILDINGFFE = 1091.50 INFILTRATION BASINELEV: 1087.50 INFILTRATION BASINELEV: 1088.50 INFILTRATION BASINELEV: 1088.50INFILTRATION BASINELEV: 1088.00 LAWNAREA LAWNAREA LAWNAREA INFILTRATION BASINELEV: 1089.50 LAWNAREA GENERAL NOTES:PLANTING SCHEDULE: UTILITY DISCLAIMER:BENCHMARK:BENCHMARK #1 0'30'60'1" = 30'Project No.Sheet:Date: designmatters SCALE VERIFICATION1" AT FULL SCALE DESIGN DEVELOPMENT sm CITY OF STEVENS POINTNEW CITY HALLPROJECT LOCATION799712/30/25L100 LANDSCAPEPLAN LEGEND:KEYNOTES: Page 17 of 40 PROPOSED CITYHALL BUILDINGFFE = 1091.50 INFILTRATION BASINELEV: 1087.50 INFILTRATION BASINELEV: 1088.50 INFILTRATION BASINELEV: 1088.50INFILTRATION BASINELEV: 1088.00 LAWNAREA LAWNAREA LAWNAREA INFILTRATION BASINELEV: 1089.50 LAWNAREA EROSION CONTROL LEGEND:GENERAL NOTES: UTILITY DISCLAIMER:BENCHMARK:BENCHMARK #10'30'60'1" = 30'Project No.Sheet:Date: designmatters SCALE VERIFICATION1" AT FULL SCALE DESIGN DEVELOPMENT sm CITY OF STEVENS POINTNEW CITY HALLPROJECT LOCATION799712/30/25C400 EROSIONCONTROLPLAN Page 18 of 40 PROPOSED CITYHALL BUILDINGFFE = 1091.50 INFILTRATION BASINELEV: 1087.50 INFILTRATION BASINELEV: 1088.50 INFILTRATION BASINELEV: 1088.50INFILTRATION BASINELEV: 1088.00 LAWNAREA LAWNAREA LAWNAREA BID ALTERNATEBUILDING ADDITIONAND PARKING LAWNAREA UTILITY DISCLAIMER:BENCHMARK:BENCHMARK #1 0'30'60'1" = 30'Project No.Sheet:Date: designmatters SCALE VERIFICATION1" AT FULL SCALE DESIGN DEVELOPMENT sm CITY OF STEVENS POINTNEW CITY HALLPROJECT LOCATION799712/30/25L100A LANDSCAPEPLAN GENERAL NOTES:PLANTING SCHEDULE:LEGEND:KEYNOTES: Page 19 of 40 PROPOSED CITYHALL BUILDINGFFE = 1091.50 INFILTRATION BASINELEV: 1087.50 INFILTRATION BASINELEV: 1088.50 INFILTRATION BASINELEV: 1088.50INFILTRATION BASINELEV: 1088.00 LAWNAREA LAWNAREA LAWNAREA BID ALTERNATEBUILDING ADDITIONAND PARKING LAWNAREA UTILITY DISCLAIMER:BENCHMARK:BENCHMARK #10'30'60'1" = 30'Project No.Sheet:Date: designmatters SCALE VERIFICATION1" AT FULL SCALE DESIGN DEVELOPMENT sm CITY OF STEVENS POINTNEW CITY HALLPROJECT LOCATION799712/30/25C400A EROSIONCONTROLPLAN EROSION CONTROL LEGEND:GENERAL NOTES: Page 20 of 40 J J FLAGPOLES NEW CITY HALL WATER STREET ELLIS STREET X5 X5 X3 X3 X3 30 31 X3H X3H X3H X3H Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 X5 X3H X5 X5 X5 X5 X1 X1 X1 X1 X1 F1 F1 F1 F1 F1 F1 F1 POLE BASE DETAIL - FIXTURE ABOVE GRADE 1" CONDUIT (TYPICAL) 30" CONDUIT 6" 8" MIN. MIN. 6' -0" 2" 20" 2" 3" CLEAR GRADE GRADE 24" MINIMUM GROUND ROD FORM ALL EXPOSED CONCRETE. PROVIDE 3/4" RADIUS BULLNOSE ALL AROUND. LOCK WASHER (TYPICAL) STUB CONDUIT UP WITHIN BASE DIAMETER BOLT CIRCLE AS DETERMINED BY POLE MANUFACTURER TYPICAL - APPLY LUBRICANT TO ALL BASE BOLTS. 3/4" DIA.x10' -0" COPPERCLAD GROUND ROD REQUIRED. MINIMUM 8" GREATER THAN BOLT CIRCLE DIAMETER GROUNDING BUSHING ON EACH CONDUIT SIZE AND LENGTH OF ANCHOR BOLTS AS DETERMINED BY POLE MANUFACTURE. 4" L BEND TYPICAL GRADE 60 #4 REBAR TYPICAL ORIENT ANCHOR BOLTS PARALLEL TO THE CURB LINE A. PROVIDE A SPARE CONDUIT STUB AT EACH END -OF -LINE FIXTURE. SEE PLANS FOR ADDITIONAL SPARE STUBS. 4'-7" 3'-0" MIN. LIGHT BOLLARD BASE DETAIL GROUND ROD. 1/2" x 8'-0" COPPER CLAD 12" DIA. CONCRETE BASE BY GENERAL CONTRACTOR TO NEXT FIXTURE 1" PVC CONDUIT #3 TIES AT 12" O. C. GRADE 4 - #6 VERT. WITH 3 TIES AT TOP 2" CONDUIT GROUND ROD STUB CONDUIT UP WITHIN BASE DIAMETER BOLT CIRCLE AS DETERMINED BY POLE MANUFACTURER MINIMUM 8" GREATER THAN BOLT CIRCLE DIAMETER ORIENT ANCHOR BOLTS PARALLEL TO THE CURB LINE This drawing may not be reproduced without the written permission of Somerville, Inc. Permission or copies of this drawing may be obtained by emailing: Planrequests@somervilleinc.com Project No. Sheet: Date: design matters Somerville, Inc. c SCALE VERIFICATION 1" AT FULL SCALE PRELIMINARY sm 1/26/2026 3:26:43 PM CITY OF STEVENS POINT NEW CITY HALL PROJECT LOCATION 7997 2/2/2026 E104 2026 PLAN NOTES: X N ELECTRICAL - LIGHTING SCALE: E104 1/16" = 1'-0" SITE PLAN - BASE BID 1 30 PROVIDE POWER FOR MONUMENTAL SIGN. 31 PROVIDE CONDUIT STUB FOR FUTURE PUBLIC ART DISPLA Y LIGHT. NO SCALE E104 2 NO SCALE E104 3 Revision Description Date Page 21 of 40 J J FLAGPOLES NEW CITY HALL WATER STREET ELLIS STREET X5 X5 X5 X5 X3 X3 X3 30 31 X3H X3H X3H X3H Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 X5 X3H X5 X1 X1 X1 X1 X1 F1 F1 F1 F1 F1 F1 30 F1 F1 This drawing may not be reproduced without the written permission of Somerville, Inc. Permission or copies of this drawing may be obtained by emailing: Planrequests@somervilleinc.com Project No. Sheet: Date: design matters Somerville, Inc. c SCALE VERIFICATION 1" AT FULL SCALE PRELIMINARY sm 1/26/2026 3:26:45 PM CITY OF STEVENS POINT NEW CITY HALL PROJECT LOCATION 7997 2/2/2026 E105 2026 PLAN NOTES: X 30 PROVIDE POWER FOR MONUMENTAL SIGN. 31 PROVIDE CONDUIT STUB FOR FUTURE PUBLIC ART DISPLA Y LIGHT. ELECTRICAL - LIGHTING SCALE: E105 1/16" = 1'-0" SITE PLAN - ALTERNATE BID 1 N Revision Description Date Page 22 of 40 Designer Date 01/26/2026 Scale Not to Scale Drawing No. Summary 1 of 1 Statistics Description Symbol Avg Max Min Max/Min Avg/Min Calc Zone #1 2.6 fc 19.0 fc 0.1 fc 190.0:1 26.0:1 1.7 2.6 1.6 0.9 0.5 0.3 1.6 0.5 1.4 0.3 1.9 0.5 1.1 1.2 2.9 0.4 1.1 2.7 6.4 3.8 3.2 4.2 5.9 2.8 1.8 0.7 0.2 0.3 0.5 0.6 0.5 0.9 1.1 0.6 0.4 2.6 3.6 1.7 0.9 0.5 0.7 3.6 1.0 0.2 0.2 0.5 0.9 2.0 2.8 3.2 2.1 1.1 0.5 2.5 3.5 2.1 1.2 0.6 0.4 8.4 1.5 0.2 0.2 0.6 1.9 4.4 4.6 3.9 2.6 1.3 0.6 3.8 4.4 2.8 1.4 0.6 0.4 7.5 1.9 0.3 0.2 0.2 0.2 0.5 1.2 3.6 5.1 4.0 2.9 1.8 0.8 0.3 4.0 4.5 2.9 1.5 0.7 0.7 7.4 2.0 0.4 0.4 0.4 0.5 1.7 2.6 3.8 3.8 2.7 1.7 0.9 0.4 2.6 3.6 2.3 1.3 0.7 0.5 10.3 2.2 0.6 0.7 1.1 2.6 3.4 3.0 2.9 2.5 1.5 0.8 0.4 3.0 3.9 2.1 1.3 0.9 0.7 7.2 2.1 0.8 1.4 3.8 5.2 4.0 3.0 2.0 1.2 0.6 0.3 2.3 3.3 2.3 1.7 1.2 1.3 10.2 2.0 0.8 2.1 4.7 4.8 3.4 2.2 1.2 0.6 0.3 2.7 3.7 3.2 2.4 1.9 1.8 5.1 1.6 0.9 3.1 4.9 3.8 2.6 1.5 0.7 0.4 0.2 12.9 4.6 12.7 3.4 11.6 2.6 12.9 1.3 1.8 2.4 2.3 1.8 4.1 4.0 3.3 2.0 1.1 0.6 0.3 0.2 4.7 4.3 5.6 4.0 4.7 3.0 3.5 11.4 1.6 13.1 2.5 13.8 3.3 2.7 1.9 1.2 0.7 0.4 0.2 3.1 4.1 4.4 4.7 3.9 3.0 2.2 2.3 2.4 1.5 2.1 2.5 2.9 3.1 2.7 2.1 1.4 0.8 0.4 0.2 3.3 4.3 4.7 5.6 4.4 3.1 2.2 2.0 1.6 2.9 2.5 2.7 3.1 3.3 2.8 2.3 1.6 1.0 0.5 0.2 4.1 4.8 4.4 4.2 3.5 2.9 2.1 1.5 0.9 6.2 2.9 2.8 3.7 4.5 3.1 2.4 1.7 1.1 0.5 0.2 3.5 4.8 4.3 3.6 3.0 2.6 2.0 3.1 5.6 11.1 2.9 2.7 3.5 4.1 3.0 2.4 1.7 1.1 0.6 0.3 2.8 4.1 3.5 2.9 2.4 2.0 1.6 1.5 1.2 5.1 2.8 2.6 2.8 2.9 2.6 2.3 1.6 1.0 0.5 0.3 3.7 4.6 3.0 2.4 2.0 1.7 1.4 3.1 6.9 3.5 2.6 2.1 2.2 2.3 2.2 1.9 1.4 0.9 0.5 0.3 3.3 4.5 3.3 2.5 1.9 1.6 1.4 2.0 2.3 13.5 16.0 13.9 5.5 2.2 1.7 1.8 1.8 1.7 1.4 1.2 0.8 0.5 0.3 4.3 5.3 4.1 3.0 2.3 2.0 1.8 2.2 2.2 0.8 0.5 0.3 0.5 1.5 3.7 7.2 8.3 7.3 11.0 2.1 1.5 1.6 1.6 1.5 1.3 1.1 0.8 5.1 6.0 4.8 3.7 2.9 2.6 2.4 4.1 7.3 0.9 0.5 0.3 0.4 0.6 0.8 0.9 1.0 0.9 5.3 2.4 1.8 1.9 1.9 1.8 1.6 1.3 0.9 3.6 5.2 4.6 4.0 3.5 3.3 2.8 2.6 1.9 1.0 0.6 0.4 0.3 0.5 0.6 0.6 0.5 0.3 4.0 2.8 2.4 2.5 2.5 2.4 2.1 1.5 1.0 4.2 5.8 4.4 4.1 4.4 4.4 3.2 4.5 8.0 1.1 0.6 0.4 0.4 0.8 1.2 1.2 0.8 0.5 6.3 3.1 2.7 3.0 3.2 2.8 2.5 1.8 1.1 3.8 5.5 4.7 4.3 4.5 4.5 3.2 2.6 2.0 1.3 0.9 1.0 1.5 2.5 4.1 4.1 2.5 1.7 11.7 3.2 3.1 3.9 4.8 3.4 2.7 1.9 1.3 4.6 6.0 5.4 4.6 4.1 3.8 3.3 2.8 2.3 1.8 1.6 2.0 3.3 4.7 5.1 5.2 4.8 3.5 2.7 5.0 11.6 7.7 4.0 5.9 3.3 3.3 4.0 4.6 3.6 3.0 2.2 1.4 6.0 7.5 6.6 5.6 4.9 4.3 3.9 3.7 3.5 3.2 3.1 3.3 3.8 4.4 4.3 4.4 4.5 3.7 3.0 3.0 3.3 3.1 2.7 2.6 3.3 3.3 3.6 3.9 4.1 3.8 3.3 2.4 1.5 4.7 7.1 6.4 5.9 5.2 4.9 4.3 4.3 4.3 4.1 4.0 4.1 3.8 3.4 3.4 3.6 3.7 3.4 3.0 2.6 2.3 1.9 1.6 1.7 2.4 3.1 3.7 4.0 4.0 3.9 3.4 2.5 1.5 5.1 7.1 5.0 3.7 4.1 4.5 4.0 4.0 3.7 2.8 2.7 3.4 3.2 2.8 3.3 3.3 3.3 3.1 3.2 2.9 2.6 2.1 1.7 1.7 2.1 2.8 3.5 3.9 4.1 3.7 3.2 2.4 1.5 2.5 3.3 2.3 1.9 1.3 1.0 1.2 0.9 0.7 0.8 0.8 0.6 0.7 2.2 3.8 3.9 3.4 3.3 4.2 3.5 2.7 2.1 1.7 1.6 2.0 2.5 3.2 4.0 4.8 3.6 2.9 2.1 1.4 0.4 2.2 3.9 4.6 3.7 3.3 4.3 3.5 2.7 2.1 1.7 1.5 1.8 2.3 2.9 3.8 4.6 3.3 2.7 1.9 1.2 0.4 2.7 3.5 4.7 3.8 3.0 3.0 2.7 2.5 2.0 1.5 1.4 1.6 2.1 2.6 2.8 3.0 2.7 2.4 1.7 1.1 0.4 2.7 3.4 4.5 3.4 2.5 2.3 2.2 2.1 1.7 1.4 1.2 1.4 1.7 2.1 2.2 2.2 2.1 1.9 1.4 0.9 0.3 2.1 3.6 4.0 2.8 2.1 2.0 1.9 1.8 1.6 1.4 1.4 1.4 1.6 1.6 1.7 1.6 1.5 1.3 1.0 0.6 0.3 1.7 3.5 3.6 3.1 2.8 2.8 2.7 2.4 2.3 2.3 2.5 2.5 2.4 2.1 1.6 1.3 1.0 0.7 0.6 0.4 0.2 1.1 2.5 3.3 3.8 3.7 3.7 3.7 3.5 3.3 3.6 3.6 3.6 3.4 3.0 2.0 1.1 0.6 0.4 0.3 0.2 1.6 2.8 3.4 2.5 2.3 3.1 3.7 3.6 3.8 2.9 2.2 2.9 3.2 2.0 0.9 0.4 0.2 0.2 0.5 0.8 0.7 1.0 1.0 0.8 1.0 1.0 1.0 1.0 1.2 1.0 0.9 0.6 0.3 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 19.0 M1 M1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 M2 M2 M1 M1 M1 M1 M1 M1 M1 M1 M1 G6 G6 G6 G6 G6 G6 G6 X1 X1 X1 X1 X1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 X3H X3H X3H X3H X3H X5 X5 X5 X5 X5 X5 B2. B1 B2. X3 X3 X3 Plan View Scale - 1" = 20ft Schedule Label Manufacturer Description LLF Input Power M1 6x18 up_down cylinder - VR15, 4000K, 90CRI 25 degree 0.9 22.2 M2 Cree Lighting, Lighting Module '2000lm' Puck With Flat Diffuse Plastic Lens 0.9 24.4 B1 COOPER LIGHTING SOLUTIONS - McGraw- Edison GEKKO WALL PACK 4000LM PACKAGE 70CRI 4000K FIXTURE w/ TYPE III DISTRIBUTION OPTIC 0.9 26.5 G6 PRESCOLITE 6" LiteFrame Round Shallow Downlight, 2000 lumens, 4000K, 80+CRI, Medium, Specular Clear 0.9 16.43 Z1 WILLIAMS OUTDOOR LED 835cct 0.9 27.1 X1 Spring City Electrical Manufacturing Co Cast aluminum housing, frosted glass lens enclosure with a luminum top 0.9 120 X3 COOPER LIGHTING SOLUTIONS - McGRAW- EDISON (FORMERLY EATON) GALLEON AREA AND ROADWAY LUMINAIRE (3) 90 CRI, 4000K, 615mA LIGHTSQUARES WITH 16 LEDS EACH AND TYPE III OPTICS 1 93 X3H COOPER LIGHTING SOLUTIONS - McGRAW- EDISON (FORMERLY EATON) GALLEON AREA AND ROADWAY LUMINAIRE (3) 90 CRI, 4000K, 615mA LIGHTSQUARES WITH 16 LEDS EACH AND TYPE III OPTICS WITH HOUSE SIDE SHIELD 0.9 93 X5 COOPER LIGHTING SOLUTIONS - McGRAW- EDISON (FORMERLY EATON) GALLEON AREA AND ROADWAY LUMINAIRE (3) 90 CRI, 4000K, 1200mA LIGHTSQUARES WITH 16 LEDS EACH AND TYPE V WIDE OPTICS 1 184 Note 1. ALL PARKING AREA FIXTURES ( EXCLUDING TYPE X1) TO BE PROVIDED WITH INTEGRAL OCCUPANCY SENSOR AND 30% DIMMING CONTROL. Page 23 of 40 Designer Date 01/26/2026 Scale Not to Scale Drawing No. Summary 1 of 1 Statistics Description Symbol Avg Max Min Avg/Min Max/Min Calc Zone #1 2.7 fc 39.0 fc 0.1 fc 27.0:1 390.0:1 1.7 2.6 1.6 0.9 0.5 0.5 1.7 0.7 1.9 0.7 2.2 0.9 1.5 1.2 2.7 1.5 1.2 2.9 6.7 3.9 3.2 4.4 6.1 2.6 1.8 0.7 0.2 0.2 0.3 0.4 0.6 0.4 0.8 0.9 0.6 0.3 2.6 3.6 1.7 1.0 0.7 1.0 3.2 1.0 0.2 0.2 0.4 0.8 1.7 2.5 2.8 1.9 0.9 0.5 2.5 3.5 2.2 1.2 0.8 0.9 8.7 1.6 0.2 0.2 0.5 1.6 3.8 4.0 3.4 2.2 1.1 0.5 3.8 4.4 2.9 1.5 0.8 0.8 7.7 2.0 0.3 0.2 0.2 0.2 0.4 1.1 3.2 4.4 3.4 2.5 1.6 0.7 0.3 4.0 4.6 2.9 1.6 0.9 1.0 7.6 2.2 0.5 0.4 0.3 0.5 1.5 2.3 3.3 3.3 2.4 1.5 0.8 0.3 2.6 3.6 2.3 1.4 0.9 0.9 10.7 2.3 0.6 0.7 1.0 2.2 3.0 2.6 2.5 2.1 1.3 0.7 0.3 3.0 3.9 2.1 1.4 1.1 1.1 7.3 2.1 0.8 1.2 3.3 4.5 3.5 2.6 1.7 1.0 0.5 0.2 2.3 3.3 2.4 1.8 1.5 1.8 10.6 2.0 0.8 1.8 4.0 4.1 2.9 1.8 0.9 0.4 0.2 2.7 3.7 3.2 2.5 2.1 2.2 5.3 1.7 0.8 2.6 4.1 3.2 2.1 1.1 0.5 0.2 12.9 4.7 12.7 3.4 11.8 2.8 13.3 2.2 3.6 2.6 2.2 1.6 3.5 3.2 2.5 1.4 0.7 0.3 4.7 4.3 5.6 4.0 4.8 3.1 3.8 13.9 1.9 13.0 2.1 13.1 2.4 1.8 0.9 0.4 0.2 3.1 4.1 4.4 4.7 4.0 3.1 2.4 15.2 3.0 7.0 4.0 1.2 1.0 1.3 2.6 1.8 2.0 2.1 2.2 2.0 1.4 0.8 0.4 0.2 3.3 4.3 4.7 5.6 4.5 3.2 2.3 2.1 1.8 11.3 6.8 1.2 0.9 1.4 2.0 2.4 2.6 2.7 2.5 2.1 1.4 0.8 0.4 0.2 4.1 4.8 4.4 4.2 3.5 2.9 2.2 1.5 1.1 11.4 7.4 1.5 1.1 1.6 2.2 2.7 3.2 3.1 2.7 2.2 1.5 0.8 0.4 0.2 3.5 4.8 4.3 3.6 3.0 2.6 2.0 3.2 6.0 11.2 7.6 1.6 1.2 1.7 2.3 3.0 4.5 4.2 2.9 2.2 1.5 0.9 0.4 0.2 2.8 4.1 3.5 2.9 2.4 2.1 1.7 1.5 1.6 12.8 8.4 1.6 1.2 1.7 2.4 2.9 3.5 3.4 2.8 2.2 1.5 0.9 0.4 0.2 3.7 4.6 3.0 2.4 2.0 1.7 1.4 3.2 7.4 10.3 6.9 1.8 1.4 1.8 2.4 2.8 3.0 2.9 2.6 2.1 1.4 0.8 0.4 0.2 3.3 4.5 3.3 2.5 2.0 1.6 1.4 2.1 2.8 16.2 17.1 14.9 16.2 8.1 2.1 1.7 2.0 2.3 2.5 2.5 2.4 2.2 1.8 1.3 0.8 0.4 0.2 4.3 5.3 4.1 3.0 2.3 2.0 1.8 2.2 2.3 0.7 0.5 0.7 28.4 1.6 0.4 8.4 9.3 8.4 8.0 5.4 2.6 2.2 2.4 2.5 2.5 2.4 2.2 1.9 1.6 1.2 0.8 0.4 0.2 5.1 6.0 4.8 3.7 2.9 2.6 2.4 4.2 7.3 0.9 0.5 0.4 1.0 0.6 0.8 1.4 1.9 2.2 3.2 3.4 2.9 2.9 3.1 3.1 2.9 2.7 2.4 2.1 1.7 1.2 0.8 0.4 0.2 3.6 5.2 4.6 4.0 3.5 3.3 2.8 2.6 1.9 1.0 0.6 0.4 0.4 0.5 0.8 1.1 1.4 1.9 2.6 3.1 3.4 3.6 3.9 3.9 3.6 3.3 2.9 2.6 2.0 1.4 0.8 0.5 0.2 4.2 5.8 4.4 4.1 4.4 4.4 3.2 4.5 8.0 1.1 0.6 0.4 0.4 0.8 1.3 1.6 1.8 2.1 2.8 3.4 4.5 4.3 4.3 4.3 4.1 3.9 3.4 2.9 2.2 1.5 0.9 0.5 0.3 0.2 3.8 5.5 4.7 4.3 4.5 4.5 3.2 2.6 2.0 1.3 0.9 0.9 1.4 2.3 3.9 4.1 3.3 3.2 3.4 4.0 5.6 4.9 4.6 4.5 4.6 5.4 4.5 3.3 2.4 1.8 1.1 0.7 0.4 0.2 4.6 6.0 5.4 4.6 4.1 3.8 3.3 2.8 2.2 1.8 1.6 1.9 3.0 4.2 4.7 5.1 5.3 4.7 4.2 4.1 4.4 4.4 4.6 4.6 4.5 4.8 4.3 3.5 2.8 2.1 1.4 0.9 0.5 0.3 6.0 7.5 6.6 5.6 4.9 4.3 3.9 3.7 3.4 3.2 3.0 3.1 3.6 4.0 4.1 4.4 4.9 4.8 4.4 4.2 4.2 4.3 4.4 4.5 4.3 4.3 4.1 3.8 3.2 2.5 1.8 1.2 0.7 0.4 4.7 7.1 6.4 5.9 5.2 4.9 4.3 4.3 4.3 4.0 3.9 4.0 3.6 3.3 3.4 3.7 4.2 4.3 4.2 4.1 4.0 3.9 3.8 3.7 3.7 3.9 4.0 3.9 3.5 3.0 2.3 1.6 0.9 0.5 5.1 7.1 5.0 3.7 4.1 4.5 4.0 4.0 3.7 2.8 2.7 3.4 3.2 2.8 3.3 3.5 3.7 3.7 4.0 3.9 3.8 3.4 3.0 2.8 3.0 3.4 3.8 3.8 3.7 3.2 2.6 1.8 1.0 0.5 2.5 3.3 2.3 1.9 1.3 1.0 1.2 0.9 0.7 0.8 0.8 0.6 0.7 2.2 3.9 4.1 3.7 3.6 4.7 4.0 3.3 2.8 2.4 2.2 2.4 2.8 3.4 4.0 4.6 3.3 2.6 1.8 1.1 0.6 0.4 2.3 4.0 4.7 3.9 3.5 4.6 3.7 3.0 2.4 2.0 1.8 2.0 2.4 3.0 3.8 4.5 3.2 2.5 1.8 1.1 0.6 0.4 2.8 3.5 4.8 3.9 3.0 3.1 2.9 2.6 2.1 1.7 1.5 1.7 2.1 2.6 2.9 3.0 2.7 2.3 1.6 1.0 0.5 0.4 2.7 3.4 4.5 3.5 2.5 2.4 2.3 2.2 1.8 1.4 1.2 1.4 1.8 2.1 2.2 2.3 2.1 1.9 1.4 0.8 0.4 0.3 2.1 3.6 4.1 2.9 2.2 2.0 2.0 1.8 1.6 1.4 1.4 1.5 1.6 1.7 1.7 1.6 1.5 1.3 1.0 0.6 0.4 0.3 1.7 3.5 3.6 3.1 2.8 2.8 2.7 2.4 2.3 2.3 2.5 2.5 2.4 2.1 1.6 1.3 1.0 0.7 0.6 0.4 0.3 0.2 1.1 2.5 3.3 3.8 3.7 3.7 3.7 3.5 3.3 3.6 3.6 3.6 3.4 3.0 2.0 1.1 0.6 0.4 0.3 0.2 0.2 0.6 1.6 2.9 3.4 2.5 2.3 3.1 3.7 3.6 3.8 2.9 2.2 2.9 3.2 2.0 0.9 0.4 0.2 0.2 0.2 0.5 0.8 0.7 1.0 1.0 0.8 1.0 1.0 1.0 1.0 1.2 1.0 0.9 0.6 0.3 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 39.0 M1 @ 11' 6" M1 @ 11' 6" X3 @ 20' Z1 @ 4' 6" Z1 @ 4' 6" Z1 @ 4' 6" Z1 @ 4' 6" Z1 @ 4' 6" Z1 @ 4' 6" Z1 @ 4' 6" Z1 @ 4' 6" Z1 @ 4' 6" Z1 @ 4' 6" Z1 @ 4' 6" Z1 @ 4' 6" Z1 @ 4' 6" M2 @ 8' M2 @ 8' M1 @ 13' 6" M1 @ 13' 6" M1 @ 13' 6" M1 @ 13' 6" M1 @ 13' 6" M1 @ 13' 6" M1 @ 13' 6" M1 @ 13' 6"M1 @ 13' 6" G6 @ 10' G6 @ 10' G6 @ 10' G6 @ 10' G6 @ 10' G6 @ 10' G6 @ 10' X1 @ 20' X1 @ 20' X1 @ 20' X1 @ 20' X1 @ 20' X3 @ 20' X3 @ 20' B1 @ 11' 6" B1 @ 11' 6" B1 @ 11' 6" B1 @ 11' 6" B1 @ 11' 6" B1 @ 11' 6" B1 @ 11' 6" B1 @ 11' 6" B1 @ 11' 6" B1 @ 11' 6" B1 @ 11' 6" B1 @ 11' 6" X3H @ 20' X3H @ 20' X3H @ 20' X3H @ 20' X3H @ 20' X5 @ 20' X5 @ 20' X5 @ 20' X5 @ 20' X5 @ 20' X5 @ 20' X5 @ 20' Plan View Scale - 1" = 20ft Schedule Label Manufacturer Description LLF Input Power M1 6x18 up_down cylinder - VR15, 4000K, 90CRI 25 degree 0.9 22.2 M2 Cree Lighting, Lighting Module '2000lm' Puck With Flat Diffuse Plastic Lens 0.9 24.4 B1 COOPER LIGHTING SOLUTIONS - McGraw- Edison GEKKO WALL PACK 4000LM PACKAGE 70CRI 4000K FIXTURE w/ TYPE III DISTRIBUTION OPTIC 0.9 26.5 G6 PRESCOLITE 6" LiteFrame Round Shallow Downlight, 2000 lumens, 4000K, 80+CRI, Medium, Specular Clear 0.9 16.43 Z1 WILLIAMS OUTDOOR LED 835cct 0.9 27.1 X1 Spring City Electrical Manufacturing Co Cast aluminum housing, frosted glass lens enclosure with a luminum top 0.9 120 X3 COOPER LIGHTING SOLUTIONS - McGRAW- EDISON (FORMERLY EATON) GALLEON AREA AND ROADWAY LUMINAIRE (2) 70 CRI, 4000K, 615mA LIGHTSQUARES WITH 16 LEDS EACH AND TYPE III OPTICS 0.9 63 X3H COOPER LIGHTING SOLUTIONS - McGRAW- EDISON (FORMERLY EATON) GALLEON AREA AND ROADWAY LUMINAIRE (3) 90 CRI, 4000K, 615mA LIGHTSQUARES WITH 16 LEDS EACH AND TYPE III OPTICS WITH HOUSE SIDE SHIELD 0.9 93 X5 COOPER LIGHTING SOLUTIONS - McGRAW- EDISON (FORMERLY EATON) GALLEON AREA AND ROADWAY LUMINAIRE (3) 90 CRI, 4000K, 1200mA LIGHTSQUARES WITH 16 LEDS EACH AND TYPE V WIDE OPTICS 1 184 Note 1. ALL PARKING AREA FIXTURES ( EXCLUDING TYPE X1) TO BE PROVIDED WITH INTEGRAL OCCUPANCY SENSOR AND 30% DIMMING CONTROL. Page 24 of 40 EL. 100'-0" FIRST FLOOR EL. 114'-8" SECOND FLOOR EL. 132'-0" T/ WALL EL. 129'-0" T/ WALL EL. 132'-0" T/ WALL EL. 118'-8" T/ WALL STONE VENEER (TYP.) METAL WALL PANEL (TYP.) METAL WALL PANEL (TYP.) METAL WALL PANEL (TYP.) BRICK VENEER (TYP.) ALUMINUM STOREFRONT (TYP.) STONE SILL (TYP.) ALUMINUM CURTAIN WALL (TYP.) EL. 138'-0" T/ SCREEN WALL METAL WALL PANEL (TYP.) METAL GUARD RAIL (TYP.) METAL WALL PANEL (TYP.) EL. 116'-0" T/ WALL © Somerville, Inc. NEW CITY HALL 2/2/2026 7997 CITY OF STEVENS POINT 2026 SCALE: 1/8" = 1'-0" WEST ELEVATION - NO INDOOR PARKING OPTION SCALE: 1/8" = 1'-0" NORTH ELEVATION - NO INDOOR PARKING OPTION SCALE: 1/8" = 1'-0" EAST ELEVATION - NO INDOOR PARKING OPTION SCALE: 1/8" = 1'-0" SOUTH ELEVATION - NO INDOOR PARKING OPTION HISTORIC IMAGE HISTORIC IMAGE Page 25 of 40 © Somerville, Inc. NEW CITY HALL 2/2/2026 7997 CITY OF STEVENS POINT 2026 NORTHWEST PERSPECTIVE SOUTHWEST PERSPECTIVE NORTHEAST PERSPECTIVE SOUTHEAST PERSPECTIVE Page 26 of 40 EL. 100'-0" FIRST FLOOR EL. 114'-8" SECOND FLOOR EL. 132'-0" T/ WALL EL. 129'-0" T/ WALL EL. 132'-0" T/ WALL EL. 118'-8" T/ WALL EL. 114'-8" T/ WALL STONE VENEER (TYP.) METAL WALL PANEL (TYP.) METAL WALL PANEL (TYP.) METAL WALL PANEL (TYP.) BRICK VENEER (TYP.) STONE SILL (TYP.) ALUMINUM CURTAIN WALL (TYP.) ALUMINUM STOREFRONT (TYP.) EL. 138'-0" T/ SCREEN WALL METAL WALL PANEL (TYP.) METAL GUARD RAIL (TYP.) METAL WALL PANEL (TYP.) EL. 116'-0" T/ WALL © Somerville, Inc. NEW CITY HALL 2/2/2026 7997 CITY OF STEVENS POINT 2026 SCALE: 1/8" = 1'-0" WEST ELEVATION - WITH INDOOR PARKING OPTION SCALE: 1/8" = 1'-0" NORTH ELEVATION - WITH INDOOR PARKING OPTION SCALE: 1/8" = 1'-0" EAST ELEVATION - WITH INDOOR PARKING OPTION SCALE: 1/8" = 1'-0" SOUTH ELEVATION - WITH INDOOR PARKING OPTION Page 27 of 40 © Somerville, Inc. NEW CITY HALL 2/2/2026 7997 CITY OF STEVENS POINT 2026 NORTHWEST PERSPECTIVE SOUTHWEST PERSPECTIVE NORTHEAST PERSPECTIVE SOUTHEAST PERSPECTIVE Page 28 of 40 Page 29 of 40 Page 30 of 40 Page 31 of 40 Page 32 of 40 Page 33 of 40 LIBRARY OFFICE MAIL STAIR CLOSED MEETINGS MECHANICAL ELEV 8 PARKING STALLS 8 PARKING STALLS (2 HANDICAP) VESTIBULE VESTIBULE SMALL CONFERENCE ROOM VOTE ROOM SECURE STORAGE LOCK/LTE OPEN WORK AREA WOMEN'S TOILET MEN'S TOILET STORAGE CLERK PARKING MUNICIPAL COURT / COUNCIL CHAMBERS PUBLIC WORKS COMMUNITY AND ECONOMIC DEVELOPMENT OFFICE OFFICE JAINTOR CLOSET OFFICE PUBLIC CONFERENCE ROOM OPEN WORK AREA WOMEN'S TOILET MEN'S TOILET TREASURY RECEPTION STORAGE LAYOUT/ PRINT AREA OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE STORAGE OPEN WORK STATIONS OFFICE LAYOUT/ PRINT AREA RECEPTION STORAGE SEATING FOR APPROX. 100 PEOPLE OFFICE SECURE STORAGE MUNICIPAL COURT CONTROL ROOM CONFERENCE ROOM PUBLIC CONFERENCE ROOM OFFICE OFFICE MEETING AREA SMALL CONFERENCE ROOM ELECTRCIAL MECHANICAL ENCLOSURE TOILET CITY ATTORNEY CITY VEHICLE PARKING CLERK COMMUNITY AND ECONOMIC DEVELOPMENT CORRIDOR FIRE DEPT. IT DEPT. MAYOR'S OFFICE MECHANICAL MUNICIPAL COURT PERSONNEL / HR POLICE DEPT. PUBLIC WORKS SHARED STAFF AREAS TOILET ROOM TREASURY WATER STREET ENTRY ELLIS STREET ENTRY LOBBY CORRIDOR UP UP RECEPTION DESK RECEPTION DESK RECEPTION DESK RECEPTION DESK RECEPTION DESK © Somerville, Inc. NEW CITY HALL 2/2/2026 7997 CITY OF STEVENS POINT 2026 NSCALE: 1/8" = 1'-0" FIRST FLOOR PLAN FIRST FLOOR 23,100 SF GARAGE 6,371 SF SECOND FLOOR 8,866 SF TOTAL: 38,337 SF Page 34 of 40 OFFICE OFFICE OFFICE CHECK-IN WINDOW (FUTURE OFFICE) STORAGE STAFF BREAKROOM STAIR CORRIDOR OPEN TO BELOW OPEN TO BELOW ROOF AREA ROOF AREA OPTIONAL ROOF PATIO CITY ATTORNEY CITY VEHICLE PARKING CLERK COMMUNITY AND ECONOMIC DEVELOPMENT CORRIDOR FIRE DEPT. IT DEPT. MAYOR'S OFFICE MECHANICAL MUNICIPAL COURT PERSONNEL / HR POLICE DEPT. PUBLIC WORKS SHARED STAFF AREAS TOILET ROOM TREASURY JANITOR CLOSET FITNESS ROOM PHYSICAL / FIRST AID ROOM PHYSICAL ROOM WALKWAY WORK BENCH OFFICE OFFICE WAITING ROOM CORRIDOR ROOF AREA ELEV IT DEPT. HUMAN RESOURCES CITY ATTORNEY MAYOR MEN'S TOILET WOMEN'S TOILET SHOWER ROOM IT STOR CONFERENCE DATA ROOM CONFERENCE ROOM WELLNESS ROOM SMALL CONFERENCE OFFICE (FUTURE OFFICE) STORAGE WORK ROOM ROOF AREA DOWN DOWN MECHANICAL AREA MECHANICAL AREA © Somerville, Inc. NEW CITY HALL 2/2/2026 7997 CITY OF STEVENS POINT 2026 SCALE: 1/8" = 1'-0" SECOND FLOOR PLAN N FIRST FLOOR 23,100 SF GARAGE 6,371 SF SECOND FLOOR 8,866 SF TOTAL: 38,337 SF Page 35 of 40 Page 36 of 40 Page 37 of 40 Page 38 of 40 Page 39 of 40 Page 40 of 40

Source: City of Stevens Point website. First collected Oct 30, 2026.