RecordWell Data

Board of Water and Sewerage Commissioners — Agenda Packet

City of Stevens Point · Portage County · Board of Water and Sewerage Commissioners · meeting of Jan 12, 2026 · Agenda packets

Open the original document More from City of Stevens Point

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Our intention is to have in-person meetings going forward. Meetings will be held at 300 Bliss Avenue. This in-person location will meet the legal requirement for our open meetings. We will have a virtual option available, but technology for the hybrid style meeting may not be reliable. City of Stevens Point Board of Water and Sewerage Commissioners January 12, 2026 - 12:00 PM Stevens Point Public Utilities 300 Bliss Avenue, Stevens Point, WI OR Zoom Teleconferencing Meeting ID: 820 26885705 By Computer: https://us02web.zoom.us/j/82026885705 By Phone: (303) 715-8592 AGENDA Discussion and Possible Action on: 1. Roll Call. 2. Approval of Minutes 3. Approval of Department Claims 4. Public Hearing/Input on NR 854 document related to Water Supply Service Area Plans - Joel Lemke 5. Water Supply and Distribution Reports - Eric Southworth 6. Sewage Treatment Operations Report - Chris Lefebvre 7. Construction and Maintenance Report - Shane Kohnen 8. Directors Report - Joel Lemke 9. Adjournment. The next Water and Sewerage Commission meeting will be Monday, February 9, 2026 at noon. Any person who has special needs while attending this meeting or needing agenda materials for this meeting should contact the Director as soon as possible to ensure a reasonable accommodation can be made. The Director can be reached by telephone at (715) 345-5260, or by mail at 300 Bliss Avenue, P.O. Box 243 Stevens Point, WI. Copies of resolutions, reports and minutes of the Board of Water & Sewerage Commission Meetings are on file at the Admin Office of the Water & Sewage Departments for inspection during normal business hours from 7:30 A.M. to 4:00 P.M. Page 1 of 58 City of Stevens Point Board of Water and Sewerage Commissioners December 8, 2025 - 12:00 PM Stevens Point Public Utilities 300 Bliss Avenue, Stevens Point, WI OR Zoom Teleconferencing Meeting ID: 820 26885705 By Computer: https://us02web.zoom.us/j/82026885705 By Phone: (303) 715-8592 MINUTES Discussion and Possible Action on: 1. Roll Call. PRESENT: Paul Adamski, Mae Nachman, Carl Rasmussen, Anna Haines and Ray Schmidt ALSO PRESENT: Joel Lemke, Eric Southworth, Chris Lefebvre, Shane Kohnen, Jason Draheim, Jaime Zdroik and resident-Jeff Bushman 2. Approval of Minutes Motion made by Anna Haines, seconded by Ray Schmidt to approve the November 10, 2025, meeting minutes of the Board of Water & Sewerage Commission. Ayes all. Nays none. Motion carried. 3. Approval of Department Claims Motion made by Ray Schmidt, seconded by Carl Rasmussen to approve the department's claims for the month of November 2025 as audited and read. Ayes all. Nays none. Motion carried. 4. Commissioner compensation - Joel Lemke Joel's memo in the packet showed what the Commissioners have been paid in previous years and what the pay would be for 2026 with the 2.64% COLA that has been established City-wide. The Commission's compensation was not always reviewed regularly, so years went by without increases. In approximately 2020, we reviewed it again, comparing it to what other City boards make, like Common Council. That helped us come up to where the pay should be, and we have been applying the cost of living annually since then. Page 2 of 58 Motion made by Carl Rasmussen, seconded by Anna Haines to approve the 2026 Commissioner's compensation with 2.64% cost of living (COLA) increase. Ayes all. Nays none. Motion carried. 5. Water Supply and Distribution Reports - Eric Southworth Eric stated he would look into why the kilowatts were up with pumpage being down slightly on the reports. Other than that, he had nothing else to add. 6. Sewage Treatment Operations Report - Chris Lefebvre Chris stated the WWTP met all permit limits for the month of November. He stated the biosolids dryer is up and running. He also explained that the ammonia level is up because they can't biologically remove both ammonia and phosphorus at the same time. Ammonia level is still within permit limits. 7. Construction and Maintenance Report - Shane Kohnen The Commission reviewed the monthly report. Shane stated he had nothing else to add. We are currently in winter operation. 8. Directors Report - Joel Lemke Joel explained to the Commission that he has a memo in the Public Works packet for the meeting tonight regarding an ordinance amendment that would clarify future utility extension projects in the Village of Park Ridge. More details regarding this will be brought back to the Commission next month. 9. Adjournment. Motion made by Ray Schmidt to adjourn the meeting. Ayes all. Nays none. Motion carried. Meeting Adourned: 12:18 P.M. Page 3 of 58 FINANCES: Bank balance as of December 1, 2025 2,811,121.57$ Bank deposits recorded in December 2025 5,523,491.25$ 8,334,612.82$ CHECKS ISSUED DECEMBER 2025: 60742 Mae Nachman Salary 64.41 60743 Community Foundation of Central WI Employee Contribution 10.00 60744 United Way Of Portage County United Way 63.69 60746 Baker Tilly Virchow Krause LLP Rate Study 4,590.00 60747 Central States H & W Fund Health Insurance Premiums 46,787.17 60748 Vestis Rugs 46.82 60749 AnSer After hours answering services 195.00 60751 Aspirus Medical Group, Inc. Wellness Program 109.00 60754 Baker Tilly Virchow Krause LLP 2025 Audit 204.91 60755 Capital OneTrade Credit Supplies #1666325984 403.12 60756 City Of Stevens Point Retirement, insurance, phone & fuel, workers comp premiums 22,411.63 60759 Employee Resource Center Inc Monthly EAP Fees 50.83 60761 H&S Protection Systems Inc Annual Alarm Monitoring-Water Office 683.16 60765 Metron-Farnier LLC Meters & shipping 35,913.54 60766 NAPA Cleaning squeegee for truck #1 21.99 60769 Plaski Disposal Dumpster Services 150.00 60772 Springbrook Holding Company LLC Civic pay transaction fees 1.00 60773 Summit Fire Protection Annual fire extinguisher inspection 677.85 60774 U.S. Postal Service Annual Rental PO Box 242 244.00 60775 WI Rural Water Assoc Membership Renewal 50.00 60779 INFOSEND INC Statement & notice printing 2,696.15 60780 Lou's Gloves Nitrile Gloves 424.00 60783 Mastercard Charger, office supplies, Well 11 maintenance, Conference expenses 2,289.25 60784 Point Supply Shop supplies 86.85 60786 Vestis Rugs 46.82 60788 WI Central Water pipe line lease 100.00 60791 Ferguson Waterworks #1476 Meter gaskets 90.00 60792 First Supply LLC -Plover Inventory 137.64 60793 Community Foundation of Central WI Green Circle Joel Lemke 10.00 60794 United Way Of Portage County United Way 63.69 60797 H&S Protection Systems Inc Remove P. Filtz from alarm panel 72.00 60800 Securian Financial MN Life Insurance Policy #002832L 187.73 60802 Stevens Point Treasurer 2025 Property Taxes 1909 Cypress, #2408.32.3004.02 2,930.90 60803 Teamsters Union Local 662 Union dues 1,731.00 60804 Angela Whelan Refund Check 004740-000, 2101-A Wyatt Ave 72.22 60805 City Of Stevens Point Sept 2025 Concrete, December Asphalt, December Concrete 6,992.00 60807 Dolce Digital Imaging Meter cards 45.00 60808 Elexco Wellington Ct. Work 7,760.00 60809 Fastenal Company PPE 214.63 60810 Hawkins Inc Chemicals 3,093.88 60811 Heartland Business Systems, LLC Monthly billing for December 199.56 60814 Petty Cash Postage, Supplies, Candy for office 82.63 60815 Mastercard Parts for truck #1, Aluminum fitting, AWS for GIS server, Water Dept tools for jobs & supplies, Laptop for Audra B., Background check -Audra B. 1,622.10 60816 WI Department of Natural Resources DNR Certification-Alex Bula 50.00 60817 WRWA WRWA Training Class - Alex Bula 625.00 60818 3K Custom Apparel Jackets embroidered 9.00 60820 Central States H & W Fund Health Insurance Premiums 29,804.17 60822 Ferguson Waterworks #1476 Meter gaskets 49.25 60824 Jerry's Small Engine Supply Co. Job tools 971.39 REPORT TO THE JANUARY 12, 2026 MEETING OF THE BOARD OF WATER AND SEWERAGE COMMISSIONERS WATER DEPARTMENT Page 4 of 58 60825 NAPA Paint for shop 68.42 60828 Vestis Rugs 46.82 60829 Community Foundation of Central WI Employee Contribution 10.00 60830 United Way Of Portage County United Way 145.00 60831 American Welding & Gas Inc Utility Garage Supplies 151.35 60832 AnSer After hours answering service 195.00 60833 Capital OneTrade Credit Tools & supplies 152.21 60834 City Of Stevens Point 2025 Street Improvement Project #25-102-Sept, 2025 Street Improvement Project #25-102-November, 2025 Street Improvement Project #25-101 November,Workers Comp Premiums 258,155.91 60835 Fastenal Company PPE - Gloves 154.19 60837 John Fabick Tractor Co Back hoe #8 parts 508.81 60838 Plaski Disposal Dumpster services 75.00 60842 Strand Associates Inc Professional Services Well 12 9,755.02 60843 Nicole Wottreng Refund Check 039247-000, 3933 Doolittle Dr #12 52.80 60844 Wroblewski Concrete Construction, LLC Concrete rings 1,512.00 Transfer Transfer of funds 1,463.49 Business Tax Fee Business Tax Fee 10.00 Bank Fees Bank Fees 1,308.54 WPS Utility Charges 21,283.86 Payroll Payroll 94,976.28 IRS & DOR PR Tax Payroll Taxes 42,773.50 Verizon Cell & iPad Charges Phone & iPad Charges 673.72 DOR Garnishment Garnishment 9.66 HRA Admin Fees Admin Fees 30.00 $ 533,760.81 $ 533,760.81 $ 7,800,852.01 Balance on Hand $ 7,800,852.01 Plus uncleared checks $ 304,185.66 Less checks previously written clearing this month $ 40,824.58 Ending Cash Balance matching Bank Statements 8,145,862.25$ BALANCE ON HAND DECEMBER 31, 2025 TOTAL EXPENSES LISTED Page 5 of 58 FINANCES: Bank Balance as of December 1, 2025 6,722,670.93$ Bank Deposits recorded in December 2025 2,840,550.17$ 9,563,221.10$ CHECKS ISSUED IN DECEMBER 2025: 60745 Andritz Separation Inc. Biosolids dryer firmware update 7,016.00 60746 Baker Tilly Virchow Krause LLP Rate Study 4,590.00 60747 Central States H & W Fund Health Insurance Premiums 21,143.18 60748 Vestis Rugs & laundry services 219.13 60750 Aquachem of America Inc. Aquachem 15,180.00 60751 Aspirus Medical Group, Inc. Wellness Program 109.00 60752 Atlas Copco Compressors LLC Parts & labor 2,624.86 60753 Badger Laboratories, Inc. Nitrate testing 60.00 60754 Baker Tilly Virchow Krause LLP 2025 Audit 151.34 60756 City Of Stevens Point Retirement, insurance, phone & fuel, workers comp premiums 10,700.02 60757 Dakota Electric Services Inc Troubleshoot Blower Motor 195.00 60758 Ben Edwards Boot & winter coat allowance-Ben Edwards 368.14 60759 Employee Resource Center Inc Monthly EAP Fees 26.91 60760 First Aid Corp Gloves 488.15 60761 H&S Protection Systems Inc Annual Alarm Monitoring-Old water garage 2,305.20 60762 Harter's Fox Valley Disposal Dumpster Services 702.63 60763 Hawkins Inc Chemicals 585.55 60764 Brad Kucharzak Jean allowance 168.75 60767 NCL of Wisconsin Inc Lab Supplies 675.26 60768 Pace Analytical Services Inc 4th Quarter Mercury Samples 434.60 60770 Security Fence & Supply Co Inc Security gates & fencing 40,769.00 60771 Spee Dee Delivery Service Inc. Shipping Charges 20.47 60773 Summit Fire Protection Annual fire extinguisher inspection 2,259.52 60777 Atlas Copco Compressors LLC New VFD for blower 34,715.95 60778 H&S Protection Systems Inc Annual Alarm Monitoring - Sewage Lab 636.96 60781 Marathon County Treasurer/Solid Waste Sludge hauling 8,960.66 60782 MC Tools and Repair LLC Supplies 1,269.72 60783 Mastercard Office supplies, winter jackets/bibs 399.97 60785 Staab Construction Corp UV Replacement 164,842.00 60786 Vestis Rugs & laundry services 219.13 60787 WDATCP Water lab license renewal 408.00 60789 Wood Street Rental LLC Material lift 84.00 60790 Airgas USA, LLC Nitrogen 2,481.12 60795 AT&T Phone charges 44.98 60796 First Aid Corp Gloves 112.00 60798 Mulcahy Shaw Water Inc Wash press gaskets 340.67 60799 RJB Property Management LLC Refund Check 020264-001, 2101 Wyatt Ave. 5.67 60800 Securian Financial MN Life Insurance Policy #002832L 70.28 60801 Spee Dee Delivery Service Inc. Shipping charges 23.00 60804 Angela Whelan Refund Check 004740-000, 2101-A Wyatt Ave. 130.53 60805 City Of Stevens Point Dec 2025 Concrete & ashphalt, Sept 2025 Concrete 8,541.00 60806 County Materials Corp Lateral replacement 2147 Strongs 844.00 60810 Hawkins Inc Chemicals 561.05 60811 Heartland Business Systems, LLC Monthly billing for December 199.56 60813 NCL of Wisconsin Inc Lab supplies 950.45 60815 Mastercard Supplies, AWS for GIS Server, pump assembly & tubing, ladder, parts for truck #30, tools, light bulbs, heating boiler cert, boiler registration renewal, AWS for IT Pipes, Laptop for Audra B., PPE L. Betro 5,162.85 60816 WI Department of Natural Resources DNR Certification-Jonathan Hankins 50.00 60817 WRWA WRWA Training Class - J. Hankins 625.00 60818 3K Custom Apparel Jackets embroidered 18.00 60819 Brenntag Great Lakes LLC Chemicals 15,582.49 60820 Central States H & W Fund Health Insurance Premiums 21,143.18 60821 CT Laboratories Biosolids Analysis 209.00 60823 Hach Company Chemicals 515.96 60827 Staab Construction Corp Condenser repair 2,113.00 60828 Vestis Rugs & laundry services 219.13 REPORT TO THE JANUARY 12, 2026 MEETING OF THE BOARD OF WATER AND SEWERAGE COMMISSIONERS SEWAGE DEPARTMENT Page 6 of 58 60834 City Of Stevens Point 2025 Street Improvement Project #25-102 September & November, 2025 Street Improvement Project #25-101 November, Workers Comp Premiums 292,076.27 60836 Hach Company Chemicals 223.17 60839 Rasmussen Plumbing & Heating Lateral Replacement Fund-2147 Strongs Ave 11,565.40 60840 Spee Dee Delivery Service Inc. Shipping charges 27.06 60841 Staab Construction Corp UV Final Clarifier - Payment No. 7 109,155.00 60843 Nicole Wottreng Refund Check 039247-000, 3933 Doolittle Dr #12 57.79 Transfer Transfer of funds 11,210.01 HRA HRA Admin Fee 30.00 Verizon Charges Verizon Charges 574.74 WPS Utility Charges Gas & Electric 19,165.40 Sewer Payroll Payroll 63,504.40 Payroll Taxes Payroll Taxes 4,047.12 Bank Fees Bank Fees 1,308.52 $ 895,216.90 895,216.90$ $ 8,668,004.20 Balance on Hand 8,668,004.20$ Plus uncleared checks 459,220.17$ Less checks previously written clearing this month (38,268.57)$ Ending Cash Balance matching Bank Statements 9,088,955.80$ (5,689,000.99)$ *Additional restricted cash of $250,000.00 is invested in CDs. 3,399,954.81$ ** Lateral Replacement fund $126,043.06 Less Restricted Balance BALANCE ON HAND DECEMBER 31, 2025 TOTAL OF EXPENSES LISTED Page 7 of 58 FINANCES: Bank balance as of December 1, 2025 288,719.13$ Bank deposits recorded in December 2025 3,339,921.50$ 3,628,640.63$ CHECKS ISSUED DECEMBER 2025: 60747 Central States H & W Fund Health Insurance Premiums 11,014.65 60751 Aspirus Medical Group, Inc. Wellness Program 109.00 60754 Baker Tilly Virchow Krause LLP 2025 Audit 151.09 60756 City Of Stevens Point Retirement, insurance, phone & fuel, workers comp premiums 5,003.61 60759 Employee Resource Center Inc Monthly EAP Fees 11.96 60773 Summit Fire Protection Annual fire extinguisher inspection 677.84 60776 Zorn Compressor & Equipment Parts for truck #33 924.23 60783 Mastercard Office supplies 26.02 60799 RJB Property Management LLC Refund Check 020264-001, 2101 Wyatt Ave. 33.09 60800 Securian Financial MN Life Insurance Policy #002832L 45.50 60805 City Of Stevens Point Dec 2025 Concrete & ashphalt, Sept concrete 11,684.00 60811 Heartland Business Systems, LLC Monthly billing for December 199.56 60815 Mastercard Laptop for Audra B., AWS for GIS Server, PPE-J. Hankins 1,455.92 60816 WI Department of Natural Resources DNR Certification-Lucas Betro 50.00 60817 WRWA WRWA Training Class - Lucas Betro 625.00 60818 3K Custom Apparel Jackets embroidered 18.00 60820 Central States H & W Fund Health Insurance Premiums 11,014.65 60826 Safe-Way Bus Transit Inc. CDL Test- L. Betro 200.00 60834 City Of Stevens Point 2025 Street Improvement Project #25-102 September & November, 2025 Street Improvement Project #25-101 November, Workers Comp Premiums 153,873.13 Bank Fees Bank Fees 1,308.52 Verizon iPad & cell phone charges 498.17 Transfer Transfer of funds 9,938.17 Payroll Payroll 16,896.51 IRS Payroll Taxes 1,778.20 WPS Monthly Utility Charges 342.27 227,879.09$ 227,879.09$ 3,400,761.54$ Balance on Hand 3,400,761.54$ Plus uncleared checks 167,282.78$ Less checks previously written clearing this month (5,105.97)$ Ending Cash Balance matching Bank Statements 3,562,938.35$ REPORT TO THE JANUARY 12, 2026 MEETING OF THE BOARD OF WATER AND SEWERAGE COMMISSIONERS STORM WATER DEPARTMENT BALANCE ON HAND DECEMBER 31, 2025 TOTAL OF EXPENSES LISTED Page 8 of 58 FINANCES: Bank balance as of December 1, 2025 370,720.91$ Bank deposits recorded in December 2025 140.27$ 370,861.18$ CHECKS ISSUED DECEMBER 2025: 60812 Millennium Fiber optic cable tag 480.37 480.37$ 480.37$ 370,380.81$ Balance on Hand 370,380.81$ Plus checks written after the end of this month -$ Plus uncleared checks Less checks previously written clearing this month Ending Cash Balance matching Bank Statements 370,380.81$ REPORT TO THE JANUARY 12, 2026 MEETING OF THE BOARD OF WATER AND SEWERAGE COMMISSIONERS FIBER (COMMUNITY AREA NETWORK) BALANCE ON HAND DECEMBER 31, 2025 TOTAL OF EXPENSES LISTED Page 9 of 58 City of Stevens Point Department of Public Utilities & Transportation P.O. BOX 243, 300 BLISS AVENUE, STEVENS POINT, WISCONSIN 54481-0243 PHONE 715-345-5260 * FAX 715-345-5369 * stevenspoint.com/water Joel C Lemke Director Phone: 715-345-5266 jlemke@stevenspoint.com January 8, 2026 MEMO RE: Water Supply Service Area Plan (NR 854) Commissioners, Our January agenda lists a public hearing for comments on the Water Supply Service Area Plan that we had created by Ruekert-Mielke. This plan requires that we provide an opportunity for public comment. We have listed the plan on the website as and put a public hearing on this agenda for those opportunities. Since we are not a community who draws water from the great lakes basin, this plan will not be reviewed or approved by the DNR. The DNR has informed me that they will not request or require a copy of the document. State Statutes simply require it to be created. The document provided is in draft form. We will take public comment, if any, into consideration and return the document with staff thoughts and corrections. No action is needed at the January Commission meeting, just an opportunity to comment from the public and from the Commission. Best Regards, Joel Lemke Director Page 10 of 58 2025 Copyright Ruekert & Mielke, Inc. Draft 2025 Water Supply Service Area Plan December 11, 2025 Draft 2025 Water Supply Service Area Plan PREPARED FOR: City of Stevens Point Water Utility 300 Bliss Avenue Stevens Point, WI 54481 PREPARED BY: Ruekert & Mielke, Inc. W233 N2080 Ridgeview Parkway Suite 300 Waukesha, WI 53188 Page 11 of 58 City of Stevens Point 2025 Water Supply Service Area Plan TOC-1 12/11/2025 09-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx TABLE OF CONTENTS I. INTRODUCTION ................................................................................................................................ 1 A. PLANNING PERIOD .................................................................................................................... 1 B. SCOPE ......................................................................................................................................... 1 C. STUDY LIMITATIONS AND ASSUMPTIONS ............................................................................. 1 II. EXISTING WATER SYSTEM FACILITIES ......................................................................................... 3 A. SERVICE AREA ........................................................................................................................... 3 B. WATER SYSTEM PRESSURE ZONES ...................................................................................... 3 C. WATER SUPPLY FACILITIES ..................................................................................................... 6 D. WATER QUALITY AND TREATMENT METHODS ..................................................................... 6 E. WATER STORAGE ...................................................................................................................... 9 F. BOOSTER PUMPING FACILITIES............................................................................................ 10 G. INVENTORY OF ALTERNATIVE SOURCES ............................................................................ 10 III. POPULATION AND COMMUNITY GROWTH ................................................................................. 11 A. POPULATION AND POPULATION DENSITY .......................................................................... 11 B. UTILITY SERVICE AREA .......................................................................................................... 11 C. PROJECTED GROWTH AREAS ............................................................................................... 11 D. SUMMARY ................................................................................................................................. 11 IV. WATER REQUIREMENTS ............................................................................................................... 14 A. WATER CONSUMPTION HISTORY ......................................................................................... 14 B. UNIT CONSUMPTION WATER USAGE ................................................................................... 14 C. TEN LARGEST WATER CUSTOMERS .................................................................................... 14 D. NON-REVENUE WATER AND UNACCOUNTED FOR WATER .............................................. 20 E. VARIATIONS IN CUSTOMER DEMANDS AND PUMPAGE .................................................... 21 F. HOURLY DEMAND FLUCTUATIONS ....................................................................................... 23 G. WATER CONSUMPTION AND PUMPAGE PROJECTIONS .................................................... 23 H. SUMMARY OF TOTAL DEMANDS AND PUMPAGE REQUIREMENTS ................................. 24 V. SUPPLY AND STORAGE ANALYSIS .............................................................................................. 26 A. WATER SUPPLY ANALYSIS .................................................................................................... 26 1. Existing Recommended Reliable Supply Capacity ............................................................. 27 B. WATER STORAGE ANALYSIS ................................................................................................. 28 1. Water Storage Needs .......................................................................................................... 28 2. Effective Storage Volumes .................................................................................................. 29 3. Recommended Existing Water Storage Volumes ............................................................... 29 C. SUPPLY AND STORAGE RESULTS ........................................................................................ 32 Page 12 of 58 City of Stevens Point 2025 Water Supply Service Area Plan TOC-2 12/11/2025 09-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx D. SUMMARY ................................................................................................................................. 32 VI. CONCLUSION AND RECOMMENDATIONS................................................................................... 33 A. KEY FINDINGS AND RECOMMENDATIONS ........................................................................... 33 1. Population Projections ......................................................................................................... 33 2. Water Demands ................................................................................................................... 33 3. Supply .................................................................................................................................. 33 4. Storage ................................................................................................................................ 33 5. Other Considerations ........................................................................................................... 33 B. CONSISTENCY WITH OTHER PLANS AND AGREEMENTS ................................................. 33 C. PLAN IMPLEMENTATION ......................................................................................................... 34 D. PUBLIC PARTICIPATION .......................................................................................................... 34 E. UPDATES TO PLAN .................................................................................................................. 34 FIGURES Figure II-1: Existing Water System ............................................................................................................... 4 Figure II-2: Existing Water System Schematic .............................................................................................. 5 Figure III-1: Proposed Developments ......................................................................................................... 13 Figure V-1: Storage Components ............................................................................................................... 28 Page 13 of 58 City of Stevens Point 2025 Water Supply Service Area Plan TOC-3 12/11/2025 09-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx TABLES Table II-1: Wells and Treatment Facilities ..................................................................................................... 7 Table II-2: Annual Well Pumpage Records ................................................................................................... 8 Table II-3: Raw Water Iron and Manganese Concentrations. Exceedances are shown red. ....................... 8 Table II-4: Well 12 PFAS Concentrations ..................................................................................................... 9 Table II-5: Water Street EST ....................................................................................................................... 10 Table II-6: Bliss Avenue EST ...................................................................................................................... 10 Table III-1: Population Trends & Projections .............................................................................................. 12 Table IV-1: Historical Water Pumpage and Sales ...................................................................................... 15 Table IV-2: Historical Customer Summary .................................................................................................. 16 Table IV-3: Water Consumption History ..................................................................................................... 17 Table IV-4: Water Usage per Customer per Day ........................................................................................ 18 Table IV-5: Historical Per Acre Usage ........................................................................................................ 18 Table IV-6: Historical Per Capita Usage ..................................................................................................... 19 Table IV-7: Ten Largest Water Customers ................................................................................................. 20 Table IV-8: Daily Pumpage Variations ........................................................................................................ 22 Table IV-9: Water Sales Projections to Planned Developments................................................................. 23 Table IV-10: Annual Water Sales and Pumpage Projections ..................................................................... 24 Table IV-11: Future Pumpage Projections .................................................................................................. 25 Table V-1: Existing Reliable Supply Capacity ............................................................................................. 27 Table V-2: Existing Recommended Reliable Supply Capacity ................................................................... 27 Table V-3: Effective Storage Volumes ........................................................................................................ 30 Table V-4: Existing and Projected Supply and Storage Requirements ...................................................... 31 Page 14 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 1 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx I. INTRODUCTION In June of 2024, Wisconsin Administrative Code (WAC) NR 854 was released, requiring many public water utilities to create water supply service area plans. This requirement applies to public water systems that withdraw from the waters of the state and that serve a population of 10,000 or more. Water systems are required to have a Water Supply Service Area Plan (WSSAP) prepared before the end of the year 2025. In addition to preparing a WSSAP, a water system is required to obtain approval from the Wisconsin Department of Natural Resources (WDNR) if either of the following conditions apply: • A general or individual permit is needed • The water system is requesting a new or increased diversion of Great Lakes water The City of Stevens Point (City) has a population of about 26,619 and is required to prepare a WSSAP; however, neither of the above criteria apply and therefore the Utility is not required to obtain WDNR approval. The City of Stevens Point Water Utility (Utility) withdraws its water from the waters of the state with its five groundwater wells; however, the Utility does not divert Great Lakes water nor plans to do so in the future. Therefore, this WSSAP is prepared to meet the requirements of NR 854. A. Planning Period This WSSAP uses a 20-year planning period and expires in the year 2045. This plan is required to be reviewed at least every 5 years and updated as necessary (NR 854.05). Current and future water needs were evaluated over a 20-year planning period with consideration given to projected future water needs extending to the year 2045. B. Scope This plan uses a systematic approach to introduce and expand basic planning concepts. A review of existing water system facilities is summarized in Chapter II. Population, community growth, and water consumption projections serve as the foundation for evaluating and identifying recommended improvements to the system and are introduced in Chapter III. The assumptions and conclusions presented in Chapter III were used to develop projections of water requirements that are presented in Chapter IV. The developed water requirements are used in Chapter V to summarize the evaluation of the water system supply and storage needs. Because needs change with time, comprehensive planning is a continuous function; therefore, the longer-term projections and improvements discussed in this report should be periodically reviewed, reevaluated, and modified, as necessary, to ensure the adequacy of future planning efforts. Proper future planning will help ensure that system expansion is coordinated and constructed in the most effective manner. C. Study Limitations and Assumptions The following limitations and assumptions underlie the work elements of this plan: 1. The primary purpose of this WSSAP is to develop a system plan to guide the extension of adequate water supply services by the Utility to existing and probable future development within the planned service area. This WSSAP includes an analysis of supply facilities such as wells and well pumps, but it does not include an analysis of distribution facilities, such as water mains and booster pumping. Page 15 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 2 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx 2. Recommendations resulting from the planning efforts are to be consistent with current federal, state and local regulations regarding facility design. 3. The investigation is limited to a review of existing available water quality data and does not include any sampling, laboratory work, or pilot testing. Page 16 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 3 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx II. EXISTING WATER SYSTEM FACILITIES This chapter presents a summary of the existing water system components of the Utility water system. The various facilities operated and maintained by the Utility include: • Seven groundwater wells, one of which is temporarily offline and one of which is not yet operational • Two elevated water storage tanks • A network of transmission and distribution water mains The general location and layout of the water system facilities are illustrated in Figure II-1 and a schematic is shown in Figure II-2. A. Service Area The service area of the Utility includes the entire municipal boundary of the City. There are plans expand the water service area beyond the current boundaries of the City, as described in the “East Park Commerce Center Water System Study” that was done by Ruekert & Mielke, Inc. in July 2025 (the EPCC Study). The existing and planned service areas are shown in Figure II-1. The existing and planned service areas are completely within the Mississippi River Basin. B. Water System Pressure Zones The Utility’s water distribution system currently consists of one pressure zone, but a new pressure zone is planned to be developed in the future, as illustrated in Figure II-1, as described in the EPCC Study. Because the City boundaries encompass an area of varied elevations, the future boosted pressure zone will be necessary to provide adequate distribution system pressures as the water system expands to the east and to the north. The main pressure zone is currently the only pressure zone, but a new pressure zone is planned to be developed, as described in the EPCC Study. The ground elevations currently served by the main pressure zone range from approximately 1,068 ft to 1,147 ft. The future pressure zone, shown in Figure II-1, is planned to develop starting at the East Park Commerce Center and will serve areas of higher elevation east of the main pressure zone. The elevations that are planned to be served by the future pressure zone range from about 1,099 ft to 1,189 ft. This boosted pressure zone is planned to include an elevated storage tank (EST) and will be supplied by several booster stations. Page 17 of 58 Page 18 of 58 Well 7 2,100 GPM 0.75 MG0.75 MG Existing Water System Schematic City of Stevens Point Portage County, WI December 2025 Main Pressure Zone LEGEND ELEVATED TANK VOLUME (MG) AND OVERFLOW ELEVATION (FEET) WELL AND PUMP RATED CAPACITY (GPM) 900 GPM Water Street Elevated Tank Well 11 5,100 GPM Bliss Avenue Elevated Tank EL. 1,252 FT USGS EL. 1,252 FT USGS 1.0 MG 0.75 MG0.75 MG Proposed Well 12 ±1,014 GPM 8166-10018 > 101 Water Supply Service Area Plan > Figure II-2_Water System Schematic.vsd Well 10 1,500 GPM Well 9 1,500 GPM Well 6 2,100 GPM Well 8 1,691 GPM Well 8 1,691 GPM Well Field Treatment Station Well 11 Treatment Station Well 12 Treatment Station1 Notes: 1. Well 12 will replace Well 4 which has been abandoned. The building that was used for Well 4 treatment will be reused for Well 12. Page 19 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 6 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx C. Water Supply Facilities The City of Stevens Point Water Utility has seven groundwater wells, as shown in Table II-1, five of which are currently operational. The wells that are currently in operation (Wells 7-11) have a total supply capacity of 13.7 million gallons per day (MGD). The annual well pumpage is shown in Table II-2. Pumpage from each well is measured using flow meters at each well discharge. Wells 6 through 10 comprise of a well field that pumps to a common treatment station. Well 6 has temporarily been taken offline until filtration equipment for manganese removal is provided. Wells 10 and 11 are radial collector wells that each have multiple pumps. Well 12 was constructed in 2024 and is not yet in full operation. Well 12 was constructed to replace Well 4 which was deactivated in 2019 and abandoned. The Well Site Investigation Report (WSIR) for Well 12 was approved by the WDNR in 2020. The well construction was approved in 2022 and completed in 2024. The Utility has plans to construct new iron and manganese removal facilities by the end of 2026 within the building that was previously used for Well 4. D. Water Quality and Treatment Methods Treatment methods used at each well are also summarized in Table II-1. Wells 6 through 11 include polyphosphate injection for corrosion control, disinfection with gas chlorine, and fluoride injection. Well 11 is also treated to remove organics, iron, and manganese. The organics removal process includes coagulation, flocculation, and sedimentation. The iron and manganese removal process includes greensand filtration. Iron and manganese sample results from Wells 6 through 12 are shown Table II-3. Well 6, which is currently offline, is planned to be equipped with filters for iron and manganese removal. Well 12, which is planned to be put into operation by the end of 2026, will also be equipped with filters to remove iron and manganese. The treatment facilities will be housed within the building that was previously used for Well 4, which was abandoned in 2019. Water samples from Wells 11 and 12 have low levels of perfluoro- and polyfluoroalkyl substances (PFAS). The PFAS concentrations found in sampling are lower than any existing or proposed health advisory levels and maximum contaminant levels (MCL), as shown in Table II-4. The Utility should continue to monitor PFAS levels to ensure that they are stable. Unless PFAS concentrations increase in future sampling, treatment to remove PFAS will likely not be needed. Page 20 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 7 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx Table II-1: Wells and Treatment Facilities Well Characteristic Well Field Well 11 Well 12 (Planned) Well 6 (Offline)1 Well 7 Well 8 Well 9 Well 10 WI Well ID BG711 BG712 BG713 BG714 LG796 WQ159 ACA566 Year Constructed 1967 1967 1967 1968 1994 2010 2024 Depth 90 ft 80 ft 85 ft 80 ft 87 ft 106 ft 83 ft Diameter 30 in 30 in 30 in 30 in 15 in 236 in 36 in Static Water Level 19.3 ft 19.1 ft 21.9 ft 20.2 ft 25.6 ft 26.5 ft 33.0 ft Pump Level 26.3 ft 23.9 ft 30.6 ft 30.7 ft 30.7 ft 39.1 ft 49.0 ft Pump Type Vertical Turbine Vertical Turbine Vertical Turbine Vertical Turbine Vertical Turbine Vertical Turbine - Capacity 2,100 gpm 2,100 gpm 1,691 gpm 1,500 gpm 4,200 gpm 5,100 gpm 1,014 gpm Motor Size 200 hp 200 hp 200 hp 200 hp 150/1502 75/75/1502 - Treatment Methods Well 6 (Offline)1 Well 7 Well 8 Well 9 Well 10 Well 11 Well 12 (Planned) Polyphosphate Injection (Corrosion Control) X X X X X X X3 Gas Chlorination (Disinfection) X X X X X X X3 Fluoridation X X X X X X X3 Ultraviolet Radiation Disinfection X Coagulation/Flocculation/ Sedimentation (Organics Removal) X Greensand Filtration (Iron/Manganese Removal) X X3 Notes: 1. Well 6 is temporarily offline and will be on standby until filtration equipment can be provided for manganese removal. 2. Well 10 has two well pumps each with 150 hp motors. Well 11 has 3 well pumps, two with 75 hp motors and one with 150 hp. 3. Treatment method is planned to be provided at Well 12. Page 21 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 8 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx Table II-2: Annual Well Pumpage Records Year Annual Withdrawal (MGY) Well 4 (Abandoned) Well 6 (Offline) Well 7 Well 8 Well 9 Well 10 Well 11 Total 2017 77.0 2.6 83.9 317.4 340.7 19.9 987.4 1,828.9 2018 179.3 1.3 90.4 218.2 457.9 19.3 1,030.7 1,997.2 2019 0.5 13.0 93.6 254.9 509.0 1.9 1,040.9 1,913.8 2020 0.4 0.4 41.2 428.3 436.7 2.2 1,043.8 1,953.1 2021 - 0.0 52.4 410.3 607.4 3.9 1,044.4 2,118.5 2022 - 0.0 163.6 540.0 759.5 2.0 1,052.2 2,517.4 2023 - 0.7 254.0 445.6 631.0 41.5 981.1 2,353.9 2024 - 0.1 233.4 464.1 694.4 0.4 1,050.2 2,442.7 Table II-3: Raw Water Iron and Manganese Concentrations. Exceedances are shown red. Well Sample Date Iron (mg/L)1 Manganese (mg/L)1 Well 6 3/17/1999 0 0.394 Well 7 3/17/1999 0 0.465 Well 8 3/17/1999 0.018 0.005 Well 9 3/17/1999 0 0 Well 10 3/14/2017 0 0.032 Well 11 12/11/2025 0.06 0.085 Well 12 12/3/2024 0.77 0.31 Notes: 1. Secondary Maximum Contaminant Levels for Iron and Manganese are 0.3 mg/L and 0.05 mg/L, respectively. Page 22 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 9 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx Table II-4: Well 12 PFAS Concentrations PFAS Chemical Name MCL, ppt Well 11 (3/10/2023) Well 12 (11/22/2024) Current Future2 PFOA - 4 1.2 2.0 PFOS - 4 1.3 2.4 PFHxs - 10 0.7 2.3 HFPO-DA (GenX) - 10 0.0 0.0 PFNA - 10 0.0 0.0 PFBS - - 1.5 1.5 Combined PFOA & PFOS 70 - 2.5 4.4 Mixture of two or more: PFHxS, PFNA, HFPO-DA and PFBS1 - 1.0 0.1 0.2 Note: ppt = Parts per trillion or ng/L 1. Hazard index is calculated per EPA requirements, as follows: 2. More stringent MCLs for PFAS are proposed by the EPA to be effective by Fall 2026. Water systems that exceed any of the MCLs need to provide treatment solutions by 2029. E. Water Storage The Utility operates two ESTs which are located throughout the water distribution system. The combined storage capacity of all the facilities is 1,750,000 gallons. One EST is a double ellipsoid tank and the other is a composite tank. Both tanks have an overflow elevation of 1,252 ft. The elevated facilities are identified as follows: Water Street (Tank #1, Double Ellipsoid) (Table II-5) Bliss Avenue (Tank #2, Composite) (Table II-6) There is also a third EST that is planned to be constructed in the future pressure zone, as described in the EPCC Study. This EST is planned to be a 1-MG composite storage tank with an overflow elevation of 1,285 ft. Page 23 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 10 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx Table II-5: Water Street EST Capacity 1,000,000 gallons Year constructed 1956 Type Ellipsoid Construction material Steel Overflow elevation 1,252 ft Diameter 75 ft Head range 35 ft Height to overflow 168 ft Table II-6: Bliss Avenue EST Capacity 750,000 gallons Year constructed 2004 Type Composite Construction material Steel & Concrete Overflow elevation 1,252 ft Diameter Varies Head range 40 ft Height to overflow 172 ft F. Booster Pumping Facilities The Utility currently does not have any booster pumping facilities; however, there are plans to construct three booster stations with the development of the future pressure zone. Preliminary locations and sizing for these booster stations are discussed in the EPCC Study. G. Inventory of Alternative Sources The Utility currently has seven groundwater wells. There are currently no plans to abandon any of the wells or seek an alternative supply. However, if the need for an alternative supply arises due to well contamination or failure, the most feasible option to provide an alternative water supply would be to drill one or more new wells. Another option that was considered for alternative water supply is establishing a wholesale connection with a neighboring water system; however, the City of Stevens Point is the largest municipality in the area and other nearby water systems would likely not have the capacity to provide large amounts of drinking water to the Utility. While a wholesale connection would be unlikely to have the capacity to be a primary source of drinking water for the City , it could be a potential option to serve as an emergency or supplemental source if the need arises. However, the City has sufficient redundancy in its water supply with seven wells and will likely not serve to benefit from an emergency connection. Page 24 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 11 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx III. POPULATION AND COMMUNITY GROWTH This chapter summarizes the planning assumptions made regarding the City. The population and community growth discussed here will be used as the basis for the service area water requirement projections presented in Chapter IV. A. Population and Population Density There is generally a close relationship between a community’s population and total water consumption volumes. As a community’s population may fluctuate up or down, it is anticipated that the water sales will also fluctuate. Therefore, future water sales can be expected to generally reflect future changes in service area population. Similarly, commercial and public water consumption will also tend to vary proportionately with the growth of the community. Table III-1 summarizes historical population data and estimates of future population for the City. According to the Wisconsin Department of Administration (DOA), the 2024 population of the City was approximately 26,619. Comparatively, the 2020 census population was 25,666. The population has, therefore, grown in recent years having seen an estimated increase of approximately 3.7% since the 2020 census. Per the United States Census Bureau QuickFacts, the average household size is 2.06. Table III-1 includes population projections from both the DOA and the from the City Planning Department. According to DOA projections, the population of the City is projected to decrease from 26,619 in 2024 to 22,454 in 2045. However, the population projections provided by the City Planning Department predict that the population will increase to 27,619 by 2045. The population projections provided by the City Planning Department, rather than the DOA, are used in projecting future water demands. B. Utility Service Area The service area of the water system encompasses the municipal boundaries of the City and are shown in Figure II-1. There are about 32 water customers outside of the City’s municipal boundary: eight in the Village of Whiting and 24 in the Town of Hull. With the planned development of a new pressure zone, the Utility plans to expand water service beyond its current service area to encompass future developments to the east and northeast. C. Projected Growth Areas Planned growth areas are shown in Figure III-1. The majority of proposed developments are planned in the future pressure zone and are described in the EPCC Study. The developments described in the EPCC Study include single- and multi-family residential, commercial, public authority, and industrial developments. There is another residential development planned near North Brilowski Road. For water demand projections, sales of water to the existing service area are assumed to be correlated with population change. Estimated future water demands to the projected growth areas are taken from the EPCC Study and are assumed to be additive to projected sales to the existing service area D. Summary This chapter summarizes the primary assumptions regarding future growth within the Utility service area. The needs and characteristics of the service area will have a direct impact on the need for the expansion of water system facilities. Therefore, the conclusions discussed in this Page 25 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 12 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx chapter are used as a primary basis for projecting future water needs, evaluating the adequacy of existing water system facilities, and determining what water system improvements are needed to maintain an adequate level of service as population increases. Table III-1: Population Trends & Projections Year Historical Population Population Change 1970 23,479 --- 1980 22,970 -2.2% 1990 23,002 0.1% 2000 24,551 6.7% 2010 26,717 8.8% 2020 25,666 -3.9% 2024 26,619 3.7% Year Projected Population DOA Projections1 Change City Projections2 Change 2030 24,861 -6.6% 26,869 0.9% 2035 24,124 -3.0% 27,119 -3.0% 2040 23,387 -3.1% 27,369 -3.1% 2045 22,454 -4.0% 27,619 -4.0% Notes: 1. Projections from the DOA. 2. Preliminary population projections provided by the City Planning Department. 0 5,000 10,000 15,000 20,000 25,000 30,000 1970 1980 1990 2000 2010 2020 2030 2040 Population Year Population Trends & Projections Historical Population DOA Projections City Projections Page 26 of 58 Page 27 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 14 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx IV. WATER REQUIREMENTS Projections of customer demands serve as the basis for capital improvements planning. Several standard methods were used in this study to project water supply and storage needs based on estimates of population and community growth. This chapter summarizes the methods used and the results of those projections. A. Water Consumption History Water consumption history reported annually to the Wisconsin Public Service Commission (PSC) from 2014 to 2024 was reviewed. A summary of historical water sales and pumpage is provided in Table IV-1. Over the 11-year period, annual water pumpage has fluctuated from a low of 1.8 billion gallons in 2016 to a high of 2.5 billion gallons in 2023. Although water usage has fluctuated both up and down, the overall trend over the past 11 years has generally increased. A summary of the number of customers in each customer class that is served by the Utility is provided in Table IV-2. Water sales to individual customer classes are summarized in Table IV-3. As shown in the tables, the number of residential and multi-family customers, as well as water sales to these customers, have increased over the past 11 years. The number of commercial customers and sales to commercial customers have remained relatively stable. The number of industrial customers has not changed significantly but sales to industrial customers have increased. Also, the number of public customers remained constant, but sales to public customers have decreased. As illustrated in Table IV-2 and Table IV-3, residential customers presently account for 84% of the Utility’s customers but only approximately 18% of the total sales in 2024. Industrial customers only make up 0.3% of the total number of customers served by the Utility; however, about 60% of all sales were to industrial customers in 2024. This is largely due to the Ahlstrom Paper Mill (formerly the Pixelle Specialty Solutions Paper Mill) which is by far the largest water customer. The paper mill alone accounts for between 40% and 50% of all water sales . B. Unit Consumption Water Usage Tables IV-4 through IV-6 show water usage per customer, per acre, and per capita, respectively. The water sales per customer show that industrial customers by far use the highest amount of water, largely due to the paper mill. The water sales per acre are based on existing land use data from the 2005 City of Stevens Point Comprehensive Plan. The water sales per capita are based on annual population for each given year. C. Ten Largest Water Customers The ten largest individual water users served by the Utility are shown in Table IV-7. According to billing data, the largest water users served by the Utility include several industrial customers, two commercial customers, and one multi-family customer. By a significant margin, the largest water customer is the Ahlstrom Paper Mill (formerly the Pixelle Specialty Solutions Paper Mill). With all its meters combined, the paper mill used a total of 1,139 MGY in 2024, resulting in an average daily flow of 3.1 MGD. The paper mill accounts for more than 95% of all industrial water usage and between 40% and 50% of all water usage in the Utility. In the past 5 years, the paper mill’s annual water usage has varied from 874 MGY in 2020 to 1,358 MGY in 2022. Page 28 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 15 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx Table IV-1: Historical Water Pumpage and Sales Year Estimated Population Total Pumpage (MG) Total Sales (MG) Pumpage Sold Non- Revenue Water Water Losses Average Day Maximum Day Ratio of Maximum to Average Day Pumpage MGD GPCD MGD Date 2014 27,040 1,896 1,753 92% 8% 6% 5.194 192.1 8.980 July 25 1.73 2015 27,037 1,884 1,734 92% 8% 5% 5.161 190.9 8.417 July 31 1.63 2016 26,895 1,801 1,588 88% 12% 7% 4.933 183.4 8.551 June 22 1.73 2017 26,757 1,826 1,797 98% 2% 6% 5.003 187.0 8.083 July 26 1.62 2018 26,749 1,990 1,944 98% 2% 7% 5.451 203.8 9.586 Aug 17 1.76 2019 26,490 1,909 1,732 91% 9% 10% 5.231 197.5 7.771 Aug 23 1.49 2020 25,666 1,947 1,746 90% 10% 1% 5.333 207.8 9.440 Aug 21 1.77 2021 25,580 2,113 1,697 80% 20% 1% 5.790 226.4 9.550 June 15 1.65 2022 25,954 2,512 2,195 87% 13% 6% 6.883 265.2 10.200 Aug 02 1.48 2023 26,332 2,532 2,271 90% 10% 7% 6.937 263.4 10.940 Jul 07 1.58 2024 26,619 2,439 1,947 80% 20% 17% 6.681 251.0 9.367 Aug 26 1.40 0 500 1,000 1,500 2,000 2,500 3,000 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Sales & Pumpage (MGY) Year Annual Water Sales and Pumpage Total Pumpage Total Sales Non-Revenue Page 29 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 16 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx Table IV-2: Historical Customer Summary Year Number of Customers Residential Commercial Industrial Public Multi- Family Total 2014 7,614 1,124 31 177 112 9,058 2015 7,647 1,089 30 176 159 9,101 2016 7,741 1,101 30 179 160 9,211 2017 7,701 1,102 25 139 160 9,127 2018 7,739 1,131 34 176 162 9,242 2019 7,959 1,225 34 194 175 9,587 2020 7,972 1,282 25 167 176 9,622 2021 7,808 1,094 26 167 159 9,254 2022 7,834 1,075 26 165 158 9,258 2023 7,880 1,120 31 166 165 9,362 2024 7,896 1,116 29 167 165 9,373 Residential 84% Commercial 12% Industrial 0.3% Public 2% Multifamily 2% 2024 Customer Summary Residential Commercial Industrial Public Multifamily Page 30 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 17 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx Table IV-3: Water Consumption History Year Annual Water Sales (MGY) Total Sales (MGY) Total Pumpage (MGY) % of Pumpage Sold Residential Commercial Industrial Public Multi- Family 2014 378.85 318.55 901.53 122.68 31.81 1,753.41 1,895.86 92% 2015 378.21 311.52 874.56 110.59 58.70 1,733.59 1,883.79 92% 2016 368.86 284.83 766.06 111.92 55.92 1,587.59 1,800.53 88% 2017 359.20 283.62 993.26 102.96 57.94 1,796.98 1,826.18 98% 2018 419.39 310.54 1,022.18 123.17 68.40 1,943.67 1,989.74 98% 2019 342.01 271.58 953.32 95.90 68.91 1,731.72 1,909.40 91% 2020 388.14 288.38 930.83 88.94 49.87 1,746.17 1,946.58 90% 2021 382.52 293.78 879.96 86.04 54.68 1,696.98 2,113.40 80% 2022 362.10 294.27 1,399.90 89.62 49.33 2,195.22 2,512.31 87% 2023 432.58 381.18 1,297.38 105.94 53.61 2,270.69 2,531.91 90% 2024 344.66 292.43 1,173.47 85.12 51.58 1,947.26 2,438.59 80% 0 200 400 600 800 1,000 1,200 1,400 1,600 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Sales (MGY) Year Water Sales by Customer Residential Commercial Industrial Public Multi-Family Page 31 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 18 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx Table IV-4: Water Usage per Customer per Day Year Gallons per Customer per Day Residential Commercial Industrial Public Multi-Family 2014 136 776 79,676 1,899 778 2015 136 784 79,869 1,722 1,011 2016 131 709 69,960 1,713 958 2017 128 705 108,851 2,029 992 2018 148 752 82,367 1,917 1,157 2019 118 607 76,819 1,354 1,079 2020 133 616 102,009 1,459 776 2021 134 736 92,724 1,412 942 2022 127 750 147,513 1,488 855 2023 150 932 114,660 1,748 890 2024 120 718 110,862 1,396 856 Average 133 735 96,846 1,649 936 Table IV-5: Historical Per Acre Usage Customer Class Residential Commercial Industrial Public Multi-Family Existing Acres1: 1,774 620 768 2,249 370 Year Gallons per Acre per Day 2014 585.1 1,407.6 3,216.1 149.4 235.5 2015 584.1 1,376.6 3,119.9 134.7 434.7 2016 569.7 1,258.6 2,732.8 136.3 414.1 2017 554.7 1,253.3 3,543.3 125.4 429.0 2018 647.7 1,372.2 3,646.5 150.0 506.5 2019 528.2 1,200.1 3,400.8 116.8 510.3 2020 599.4 1,274.3 3,320.6 108.3 369.3 2021 590.8 1,298.2 3,139.1 104.8 404.9 2022 559.2 1,300.4 4,993.9 109.2 365.3 2023 668.1 1,684.4 4,628.2 129.1 397.0 2024 532.3 1,292.2 4,186.2 103.7 381.9 Average 583.6 1,338.0 3,629.8 124.4 404.4 Notes: 1. Based on land use areas from the 2005 City of Stevens Point Comprehensive Plan. Page 32 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 19 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx Table IV-6: Historical Per Capita Usage Year Service Population Gallons per Capita per Day Residential Commercial Industrial Public Multi- Family Total Retail Sales 2014 27,040 38.4 32.3 91.3 12.4 3.2 177.7 2015 27,037 38.3 31.6 88.6 11.2 5.9 175.7 2016 26,895 37.6 29.0 78.0 11.4 5.7 161.7 2017 26,757 36.8 29.0 101.7 10.5 5.9 184.0 2018 26,749 43.0 31.8 104.7 12.6 7.0 199.1 2019 26,490 35.4 28.1 98.6 9.9 7.1 179.1 2020 25,666 41.4 30.8 99.4 9.5 5.3 186.4 2021 25,580 41.0 31.5 94.2 9.2 5.9 181.8 2022 25,954 38.2 31.1 147.8 9.5 5.2 231.7 2023 26,332 45.0 39.7 135.0 11.0 5.6 236.3 2024 26,619 35.5 30.1 120.8 8.8 5.3 200.4 Average: 39.5 31.5 103.9 10.7 5.7 191.3 0 20 40 60 80 100 120 140 160 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Per Capita Consumption (gpcd) Year Water Sales per Capita Residential Commercial Industrial Public Multi-Family Page 33 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 20 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx Table IV-7: Ten Largest Water Customers Rank Customer Name Customer Class Annual Water Usage (MGY)1 Average Daily Water Use (GPD)1 1 Ahlstrom Stevens Point Mill2 Industrial 950.7 2,604,624 2 Ahlstrom Stevens Point Mill2 Industrial 91.9 251,735 3 Ahlstrom Stevens Point Mill2 Industrial 55.2 151,131 4 Ahlstrom Stevens Point Mill2 Industrial 39.9 109,215 5 Sentry Insurance Commercial 18.7 51,146 6 Lineage Logistics, LLC Industrial 17.1 46,954 7 Sentry Insurance Commercial 12.1 33,181 8 Eagle Housing, LLC Multi-Family 11.5 31,523 9 Donaldson Industrial 11.4 31,192 10 Stevens Point Brewery Industrial 8.4 23,016 Notes: 1. Based upon billing records from January to December 2024. 2. The paper mill has several meter locations. D. Non-revenue Water and Unaccounted for Water The difference between total water pumped and total water sold is called non-revenue water. Non-revenue water is typically the result of one or more of the following: 1. Unmetered water usage for firefighting. 2. Inaccuracies in water metering devices. 3. Unmetered public water usage. 4. Leakage within the distribution system. 5. Unmetered water usage for treatment processes and maintenance purposes, such as filter cleaning, hydrant flushing and water main repairs. Non-revenue water is usually expressed as a percentage. That portion of non-revenue water attributed to leakage, meter inaccuracies, and other unknown losses is often terme d water losses and can be an indicator of the condition of the water system. When a distribution system is very old or poorly maintained, the amount of unaccounted for water often increases dramatically. Over the last 11 years, the percentage of the total non-revenue water has been reported to be as high as 20% in 2024 and as low as 2% in 2018. A summary of historical non-revenue water and water loss volumes is provided in Table IV-1. The degree of fluctuation experienced in metered pumpage is common for public water utilities and can be influenced by the factors summarized above. For example, the percentage of non-revenue water would be expected to increase in years when unusual problems with leakage or meter stoppage occurred, or when unusually high water demands for fire protection occurred. As a general rule, the percentage of non-revenue water should ideally be less than 15%. For water pumpage projections, this study assumes that the percentage of non-revenue water in future years will be maintained at 10%. Historically, the water losses for the Utility have varied. Reported non-revenue water has typically varied between 2% and 20%. Page 34 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 21 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx It is important to note that quantifying non-revenue water simply as a percent of pumped water to billed water, while widely used and accepted, is limited in its ability to accurately indicate an appropriate or acceptable level of water loss. For example, if water conservation measures are implemented causing total consumption to decrease, and yet leakage and other unaccounted - for water uses remain the same (as volume), then the percent of water losses actually increases as a percent. This would mistakenly indicate that the level of water loss has gotten worse, while in actuality, the total quantity has remained the same. E. Variations in Customer Demands and Pumpage Maximum daily water demands usually occur during the summer months on hot days when additional water is used for watering lawns, gardening, washing, and industrial cooling. Understanding and quantifying the maximum day pumpage is of particular importance to water system planning because water supply facilities must be sized to meet this demand. The maximum day demand is defined as the amount of water pumped during a single day of the year with the highest water usage. Maximum day demand is often expressed as a ratio (or factor) of the annual average day pumpage. Table IV-8 presents the average and maximum day pumpage for each year from 201 4 to 2024. With the exception of maximum day pumpage resulting from artificial demands caused by water main breaks, tank overflows, or hydrant flushing, the maximum day pumpage typically occurs during the summer months of July to September. Over the last 11 years, the maximum day pumpage ratio (ratio of maximum day to average day pumpage) has varied from a low of approximately 1.40 in 2024 to a high of 1.77 in 2020. The values shown in Table IV-8 are typical for similar sized communities. To gain a better understanding of expected fluctuations in customer demands for the Utility, a statistical analysis was performed of historical maximum day to average day pumpage ratios. The results of this analysis are also summarized in Table IV-8. The average maximum to average ratio for the past 11 years was 1.62; however, it is good practice to use a larger ratio to project future pumpage. For this reason, Table IV-8 also includes a statistical analysis of maximum day pumpage ratios for various confidence levels. For example, using a 95% confidence level, the corresponding maximum to average ratio is 1.76. Therefore, to evaluate future water supply and storage needs, a maximum day pumpage ratio of 1.76 is used for this study. Page 35 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 22 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx Table IV-8: Daily Pumpage Variations Year Avg. Day Pumpage (MGD) Max. Day Pumpage (MGD) Date of Maximum Day Ratio of Max. to Avg. Day 2014 5.19 8.980 July 25 1.73 2015 5.16 8.417 July 31 1.63 2016 4.93 8.551 June 22 1.73 2017 5.00 8.083 July 26 1.62 2018 5.45 9.586 Aug 17 1.76 2019 5.23 7.771 Aug 23 1.49 2020 5.33 9.440 Aug 21 1.77 2021 5.79 9.550 June 15 1.65 2022 6.88 10.20 Aug 02 1.48 2023 6.94 10.94 Jul 07 1.58 2024 6.68 9.367 Aug 26 1.40 Statistical Analysis Result Number of years of Data 11 Maximum Ratio - Max. to Avg. Day Pumpage 1.77 Minimum Ratio - Max. to Avg. Day Pumpage 1.40 Average Ratio Max. to Avg. Day Pumpage 1.62 Confidence Level (%) Ratio of Max. to Avg. Day 80% 1.73 85% 1.75 90% 1.76 95% 1.76 98% 1.77 100% 1.77 0.0 0.5 1.0 1.5 2.0 2.5 2014 2016 2018 2020 2022 2024 Historical Maximum Day Ratios Ratio of Max. to Avg. Day 95% Confidence Level 95% Confidence Level: 1.76 Page 36 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 23 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx F. Hourly Demand Fluctuations The hourly variation of water demands is an essential parameter in evaluating water supply and storage requirements. Peak hour demand is important because storage facilities are usually designed to equalize demands when they exceed the maximum day demand. Peak hour demand represents the hour of maximum demand. Peak hour demand is typically expressed as a ratio to the maximum day demand. According to AWWA Manual M32, typical ranges for peak hour factors in distribution systems of various sizes are 1.3 to 2.0 for peak hour to maximum day and 0.2 to 0.6 for minimum hour to maximum day. In the EPCC Study, the Utility’s SCADA data was analyzed to determine the typical peak hour factor which was found to be about to be about 1.5. In this study, a peak hour demand factor of 1.5 times the maximum day demand is used, which is typical for municipalities the size of the City of Stevens Point. G. Water Consumption and Pumpage Projections Except for industrial water sales, projected water sales to the existing service area are assumed to correlate with population change summarized in Table III-1. As discussed in Chapter III, the population is projected to increase from 26,619 in 2024 to 27,619 in 2045 according to the projections provided by the City Planning Department. Industrial water sales within the existing service area are projected to remain stable, independent of population change, at 1,200 MGY. Projected water sales to planned developments in the proposed pressure zone are taken from the EPCC Study. The total demands from the proposed developments described in the EPCC Study are about 2.95 MGD or 1,075.8 MGY. To project sales to the proposed 40-acre development near North Brilowski Road as described in Chapter III, a water use of 600 gallons per acre per day (GPAD) is applied. As shown in Table IV-5, 600 GPAD is the approximate water usage for residential areas. Using this approximate water usage per acre, the total annual water usage from the North Brilowski Road development is approximately 8.8 MGY. Water sales projections to these planned developments are shown in Table IV-9. Table IV-9: Water Sales Projections to Planned Developments Development Type Acres Projected Water Sales GPAD2 MGD MGY North Brilowski Road Development (Residential): 40 600 0.02 8.8 Developments in Proposed New Pressure Zone1 - - 2.95 1,075.8 Total Demands from Proposed Developments: 2.97 1,085 Notes: 1. Projected sales are taken from Table 4-7 from the EPCC Study. Water sales projections for the 20-year planning period of this WSSAP are shown in Table IV-10. Water sales to the existing service area and sales to new developments are added together to estimate the total projected sales. To ensure that the supply capacity of the Utility’s wells is sufficient for all proposed developments, the water demand projections assume that the proposed pressure zone will reach full buildout by 2045. The actual rate of development will likely be slower, however, by assuming a rapid rate of development, this will ensure that the supply capacity is sufficient for all proposed developments. The projected total pumpage assumes that the non-revenue water is 10% of the total pumpage. Page 37 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 24 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx Table IV-10: Annual Water Sales and Pumpage Projections Customer Classification Actual 2024 Projected 2030 2035 2040 2045 Water Sales Per Capita Sales (gpcd) Residential Sales 35 45 45 45 45 Commercial Sales 30 40 40 40 40 Industrial Sales 121 - - - - Public Sales 9 13 13 13 13 Multi-Family 5 8 8 8 8 Population Projections: 26,619 26,869 27,119 27,369 27,619 Annual Sales to Service Area (MGY)1 Residential Sales 345 441 445 450 454 Commercial Sales 292 392 396 400 403 Industrial Sales2 1,173 1,200 1,200 1,200 1,200 Public Sales 85 127 129 130 131 Multi-Family 52 78 79 80 81 Sales to New Developments3 Proposed New Pressure Zone4 0 269.0 537.9 806.9 1,075.8 N Brilowski Development 0 8.8 8.8 8.8 8.8 Total Sales (MGY) 1,947 2,517 2,796 3,075 3,353 Non-revenue Water (MGY)5 491 280 311 342 373 Total Pumpage (MGY) 2,439 2,797 3,107 3,416 3,726 Notes 1. Residential, commercial, public and multi-family water usage is assumed to correlate with population change. 2. Industrial sales are assumed to remain constant independent of population change. 3. Sales to new developments are assumed to be in addition to the sales to existing customers which correlates with population change. 4. Taken from the EPCC Study. Projected demands are assumed to reach full buildout by 2045. 5. Estimated to be 10% of total pumpage for future projections. H. Summary of Total Demands and Pumpage Requirements The total annual sales and pumpage projections previously summarized in Table IV-10 were based on a summation of water sales projections for each major customer classification. An allowance was also made for unmetered miscellaneous water usage and losses (non -revenue water) to arrive at total pumpage projections. Table IV-11 summarizes projections of future water needs for average day, maximum day, and peak hour demands. Total annual pumpage is projected to increase from approximately 2,439 MGY (6.68 MGD) to approximately 3,504 MGY (9.60 MGD) by the year 2045. Table IV-11 also illustrates the projected water sales and pumpage through the planning period. Page 38 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 25 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx Table IV-11: Future Pumpage Projections Estimate Actual 2024 Projected 2030 2035 2040 2045 Total Annual Sales (MGY) 1,947 2,517 2,796 3,075 3,353 Total Annual Pumpage (MGY) 2,439 2,797 3,107 3,416 3,726 Average Day Pumpage (MGD) 6.68 7.66 8.51 9.36 10.21 Design Maximum Day Pumpage (MGD)2 9.37 13.49 14.98 16.47 17.97 Design Peak Hour Demand (gpm)3 9,800 14,100 15,700 17,200 18,800 Notes: 1. Non-Revenue water is assumed to be 10% of total pumpage for future projections. 2. Projected maximum day pumpage projections were estimated using a ratio of maximum to average day pumpage of 1.76. 3. Design peak hour demand projections were estimated using a ratio of peak hour demand to maximum day pumpage of 1.50. Page 39 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 26 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx V. SUPPLY AND STORAGE ANALYSIS A critical step in the water system evaluation for the Utility is an assessment of water supply and storage requirements. Water supply and storage needs are closely related. The primary criteria used in determining required supply rates and storage volumes include maximum day and peak hour demands, operational characteristics, and fire protection needs. A. Water Supply Analysis As it is frequently necessary to take a well and/or booster pump out of service for periods of days to even weeks for maintenance or repair, it is necessary to properly plan to ensure that demand requirements can be met even when a pumping unit may be out of service. It is then necessary to determine a reliable capacity that accounts for the uncertainty that all pumping units will be available. By excluding one pumping unit (for planning purposes, the largest capacity unit is typically used) the reliable capacity is then determined. Therefore, reliable capacity is defined as the total available delivery rate with the largest pumping unit out of service. For evaluating a municipal water system, the reliable supply capacity should at least equal maximum day pumpage requirements, assuming adequate storage is available. If this criterion is met, supply facilities will have adequate capacity to replenish storage during off -peak hours, while depletion of available storage occurs during peak demand hours. Reliable water supply capacity is the capacity of the existing supply sources (well facilities and service pumps) to reliably supply maximum day demands from the aquifer to the water system. Table V-1 summarizes the well and well pump capacities used for the reliable water supply capacity evaluation. The reliable supply capacity is calculated assuming that the largest supply unit, Well 11, is out of service. The following sections discuss reliable water supply and system capacity in further detail for the existing water system. Page 40 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 27 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx Table V-1: Existing Reliable Supply Capacity Supply Source Supply Capacity Water to Distribution Capacity Wells (gpm) (MGD) (gpm) (MGD) Well 6 (Temporarily Offline)1 2,100 3.02 2,100 3.02 Well 7 2,100 3.02 2,100 3.02 Well 8 1,691 2.44 1,691 2.44 Well 9 1,500 2.16 1,500 2.16 Well 10 4,200 6.05 4,200 6.05 Well 112 9,050 13.03 5,100 7.34 Well 12 (Planned)3 1,014 1.46 1,014 1.46 Total Pumping Supply Capacity 21,655 31.18 17,705 25.50 Less: Largest Supply Units 9,050 13.03 5,100 7.34 Existing Reliable Supply4 9,491 13.67 9,491 13.67 Future Reliable Supply5 12,605 18.15 12,605 18.15 Notes: 1. Planned to be brought back into service in 2026. 2. Well 11 is rated for a total of 9,050 gpm. However, when all well pumps are operated simultaneously, the maximum pumping capacity based on water modeling is approximately 5,100 gpm. 3. Well 12 is not yet in operation and is planned to be put into service in 2026. 4. Capacity from Wells 6 and 12 is not included in the existing reliable supply. 5. Capacity from Wells 6 and 12 is included in the future reliable supply. 1. Existing Recommended Reliable Supply Capacity As shown in Table V-2, the existing reliable supply capacity exceeds the current maximum day demand. Therefore, the City’s wells are sufficient to meet current demands. Table V-2: Existing Recommended Reliable Supply Capacity Supply Requirements Water System 2024 gpm MGD Design Average Day Demand 4,639 6.68 Design Maximum Day Demand1 6,505 9.37 Present Reliable Supply Capacity 9,491 13.67 Reliable Supply Capacity Excess or (Deficiency) (gpm) 2,986 4.30 Notes: 1. See Table IV-1 Page 41 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 28 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx B. Water Storage Analysis 1. Water Storage Needs In addition to providing water for fire protection, system storage is used as a “cushion” to equalize fluctuations in customer demands, establish and maintain water system pressures, provide operational flexibility for water supply facilities, and improve water supply reliability. The primary criteria used in this study for evaluating storage volume needs include average and peak hour demands, water supply capacities, and fire protection needs. In general, storage facilities should be adequately sized to provide sufficient quantities of water for fire protection on days of maximum customer demands. Although storage requirements for fire protection are not anticipated to change over the planning period of this study, peak hour demands and reliable supply capacities will change as the community grows and improvements are implemented. Figure V-1 illustrates general components of system storage. As customer demands exceed supply capacities during peak hour conditions, the excess demand must be met by depleting available storage. The amount of storage depleted is referred to as equalizing storage for peak hour requirements. Figure V-1: Storage Components Page 42 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 29 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx Storage should also be available for fire protection purposes. To ensure a reliable supply for fire protection, this portion of storage should be reserved for emergency use only and should not be used to meet peak hour or operational requirements. It is assumed that the maximum fire flow requirement for the Utility is 3,500 gpm for a duration of 3 hours, or the equivalent of 630,000 gallons in each pressure zone. It is also good practice to provide additional storage for the purposes of operational needs. Operational storage allows for the control of pumps prior to the depletion of needed peak hour equalizing storage. Operational storage may be needed as a safety f actor in emergencies or where customer demands are unpredictable and fluctuate widely. Operational storage may also be desired to take advantage of off-peak electrical rates for pumping. Operational storage is assumed to be 15% of the total storage volume. 2. Effective Storage Volumes The effective storage volume of a water storage facility is the amount of available water that can be utilized while meeting regulatory requirements for system pressure. The WDNR requires that water system pressures under normal operating conditions remain above 35 psi and under emergency conditions, such as during a fire, system pressures must be maintained at a minimum pressure of 20 psi. To meet these requirements, the water surface in the storage facility must be approximately 81 feet above the highest elevation area in the service area to maintain 35 psi and at least 46 feet to maintain 20 psi. These water column heights are based upon static conditions (assuming no head losses due to friction) so actual water column heights would be higher as friction losses are included. Based upon this evaluation, the effective volume of each existing and proposed storage facility is summarized in Table V-3. Using gauging tables for the Utility’s existing and proposed ESTs, it was determined that the total storage volume effective for peak hour equalization is 1,049,000 gallons and that all the storage volume is effective for fire protection. 3. Recommended Existing Water Storage Volumes The following relationships between supply capacities and storage volumes are the primary criteria used to determine optimum storage volumes: 1. Reliable supply capacity should at least equal projected maximum day supply requirements. 2. Total available storage should be capable of meeting demands in excess of the maximum day demand as well as fire protection needs, assuming reliable supply capacity is adequate to meet maximum day requirements. The existing optimum water storage requirement for the Utility is about 1.58 MG, as shown in Table V-4. The existing storage facilities provide 1.75 MG of available storage. However, due to excess pumping capacity, the recommended storage volume can be reduced because the excess pumping capacity can be used to reduce the equalizing storage needed. When this is done, the recommended total storage capacity can be reduced by 0.70 MG to 0.88 MG. The Utility’s combined storage capacity of 1.75 MG in elevated storage is sufficient for existing demands. Page 43 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 30 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx Table V-3: Effective Storage Volumes Storage Criteria Water Street Tank Bliss Avenue Tank Proposed Tank #3 Pressure Zone Main Main Zone 2 Design Volume (gallons) 1,000,000 750,000 1,000,000 Diameter (feet) Varies Varies Varies Head Range (feet) 35.0 40.0 40.0 Storage Volume per foot (gallons) Varies Varies Varies Overflow elevation (feet USGS)1 1,252.0 1,252.0 1,285.0 Approximate Highest Elevation Served in Pressure Zone (feet USGS) 1,148 1,148 1,189 Approximate Hydraulic Grade Elevation needed to provide minimum 35 psi to all areas 1,229 1,229 1,270 Maximum Effective Peak Hour Storage Volume (gallons)2 374,000 245,000 430,000 Approximate Hydraulic Grade Elevation needed to provide minimum 20 psi to all areas 1,194 1,194 1,235 Additional Effective Fire Protection and Emergency Storage Volume (gallons)3 626,000 505,000 570,000 Total Effective Storage Volume (gallons) 1,000,000 750,000 1,000,000 Notes: 1. Not including the proposed boosted pressure zone. 2. Effective peak hour storage is considered the volume available which will continue to maintain adequate pressures in the distribution system at a minimum of 35 psi (under static conditions). Volumes derived from storage tank gauging tables. 3. Effective fire protection and emergency storage is considered the volume available which will continue to maintain pressures in the distribution system at a minimum of 20 psi (under static conditions). Volumes derived from storage tank gauging tables. Page 44 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 31 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx Table V-4: Existing and Projected Supply and Storage Requirements Supply Recommendations Existing 2024 Projected 2030 Projected 2035 Projected 2040 Projected 2045 gpm MGD gpm MGD gpm MGD gpm MGD gpm MGD Design Average Day Demand 4,639 6.7 5,321 7.7 5,910 8.5 6,499 9.4 7,088 10.2 Design Maximum Day Demand 6,505 9.4 9,365 13.5 10,402 15.0 11,438 16.5 12,475 18.0 Design Peak Hour Demand 9,800 14.1 14,100 20.3 15,700 22.6 17,200 24.8 18,800 27.1 Design Reliable Supply Capacity1 9,491 13.7 12,605 18.2 12,605 18.2 12,605 18.2 12,605 18.2 Reliable Supply Capacity Excess or (Deficiency) (gpm) 2,986 3,240 2,203 1,167 130 Storage Recommendations Existing 2024 Projected 2030 Projected 2035 Projected 2040 Projected 2045 Peak Hour Equalizing Need (gallons)2 714,000 1,028,000 1,142,000 1,256,000 1,370,000 Optimum Fire Protection Needs (gallons)3 630,000 1,260,000 1,260,000 1,260,000 1,260,000 Operating Storage (gallons; 15% of Total)4 238,000 404,000 424,000 444,000 465,000 Total Optimum Recommended Storage (gallons) 1,582,000 2,692,000 2,826,000 2,960,000 3,095,000 Available Effective Storage Capacity (gallons): Water Street Tank (374,000 gallons peak hour; 626,000 gallons fire flow) 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 Bliss Avenue Tank (245,000 gallons peak hour; 505,000 gallons fire flow) 750,000 750,000 750,000 750,000 750,000 Proposed Tank #3 (430,000 gallons peak hour; 570,000 gallons fire flow) - 1,000,000 1,000,000 1,000,000 1,000,000 Total Effective Storage Capacity (gallons)5 1,750,000 2,750,000 2,750,000 2,750,000 2,750,000 Subtotal Additional Capacity Recommended (gallons) None None 76,000 210,000 345,000 Less: Excess Available Reliable System Supply Capacity for Peak Hour (gallons)6 706,000 903,000 723,000 419,000 55,000 Less: Excess Supply Capacity Available for Fire Protection (gallons)7 None None None None None Total Storage Capacity Excess or (Deficiency) (gallons)8 874,000 961,000 647,000 209,000 (290,000) Notes: 1. Reliable Supply Capacity is with largest source out of service. 2. Peak hour storage is storage utilized to meet demands which exceed the maximum day demand rate assuming the reliable supply capacity is equal to the maximum day demand rate. 3. Optimum fire protection based on 3,500 gpm for 180 minutes in each pressure zone. A second pressure zone is proposed and is included in future years 4. Operating storage is storage utilized to provide a start/stop range for pump operation and an emergency reserve storage supply. 5. Total Effective Storage Capacity is limited to a total of the Optimum Fire Protection Needs plus peak hour available storage to maintain regulatory system pressures. 6. Supply Capacity Credit cannot exceed Peak Hour Equalization and is calculated utilizing the time of day demand curve and current supply capacity. 7. Supply Capacity Credit cannot exceed Fire Protection Need and is calculated as the reliable supply capacity in excess of Peak Hour Demand x 180 min. 8. Individual pressure zones are not analyzed in this study. A separate analysis would be needed to estimate supply and storage needs in individual pressure zones. Page 45 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 32 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx C. Supply and Storage Results The results from the supply and storage analysis are included in Table V-4. The existing reliable supply capacity does not include Wells 6 and 12, which are both planned to be put into operation in the year 2026; the reliable supply capacity for future years includes Wells 6 and 12, as shown in Table V-1. Additionally, the storage capacity for projected years includes a 1.00 MG EST that is proposed in the new pressure zone. The results of the analysis show that the Utility has sufficient supply for all the water demands that were projected in Chapter IV. The projected 2045 maximum day demand is 18.0 MGD and the reliable supply, including Wells 6 and 12, is 18.2 MGD. However, even with the proposed 1.00 MG EST, there is projected to be a 0.29 MG deficiency in storage. The EPCC Study notes that in addition to the recommended 1.00 MG EST, an additional 0.25 MG of storage may be needed in the new pressure zone before full buildout. It is important to note that the supply and storage analysis in this WSSAP does not analyze the storage capacity in individual pressure zones. As water demands increase over time, the storage capacity should be revisited to determine how much additional storage is needed in each pressure zone. Given that a rapid rate of development is assumed in this WSSAP, these findings should be reevaluated as development progresses. D. Summary This section summarizes the findings from the supply and storage evaluation of the City of Stevens Point Water Utility. Major findings from this evaluation include the following: 1. The reliable supply capacity, once Wells 6 and 12 are in operation, is adequate to meet current and projected water demands until the end of the planning period of 2045. 2. The Utility is projected to need additional storage towards the end of the planning period. However, given that a rapid rate of development is assumed in this WSSAP, this should be confirmed later as development progresses. Page 46 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 33 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx VI. CONCLUSION AND RECOMMENDATIONS A. Key Findings and Recommendations 1. Population Projections The City Planning Department’s preliminary population projections predict an increase from 24,619 in 2024 to 27,619 by 2045 which is the end of the planning period of this study. The proposed developments throughout the City include residential, commercial, industrial, and multi-family. 2. Water Demands The existing average day and maximum day water demands from 2024 pumpage are 6.68 MGD and 9.34 MGD, respectively. The total average and maximum day water demands are projected to increase to 10.21 MGD and 17.97 MGD by 2045, respectively. 3. Supply The Utility has seven groundwater wells with a total reliable supply capacity of 12,605 gpm or 18.15 MGD. This is sufficient to meet the projected 2045 maximum day demand of 12,475 gpm or 18.0 MGD. 4. Storage The Utility currently has 1.75 MG of elevated water storage with another 1.00 MG EST proposed in the new pressure zone. The total elevated storage capacity is projected to be slightly deficient by the end of the planning period. However, given that this WSSAP assumes a rapid rate of development, this should be revisited in the future as demands increase. 5. Other Considerations The largest water customer, Ahlstrom Paper Mill, accounts for nearly half of all water usage within the City. If the paper mill were to increase or reduce water usage, or shut down, this would significantly impact water distribution and the findings in this report would need to be revisited and revised. If water usage is reduced at any point, this would result in overall lower water usage and excess supply capacity. Conversely, if the water usage at the paper mill increases, this would reduce the Utility’s ability to serve future developments. B. Consistency With Other Plans and Agreements Previous studies and plans were reviewed to ensure consistency with this WSSAP. This WSSAP uses full buildout water demand projections from the EPCC Study that was done by Ruekert & Mielke, Inc. in 2025. Additionally, the 2024 Portage County Comprehensive Plan and the 2025 North Central Wisconsin Regional Planning Commission (NCWRCP) Comprehensive Plan were reviewed. It was found that the findings of this WSSAP are consistent with these two comprehensive plans. The latest comprehensive plan done by the City in 2005 is currently being updated by the City. Once the updated comprehensive plan is finalized, it should be reviewed for consistency with the findings in this WSSAP. If the findings are not consistent with the comprehensive plan, modifications should be made to update the WSSAP and bring it to compliance with the comprehensive plan. Page 47 of 58 City of Stevens Point 2025 Water Supply Service Area Plan 34 12/11/2025 8166-10118.100 > 2025 Water Supply Service Area Plan (20251211 Draft).docx C. Plan Implementation There are no immediate steps required to implement this WSSAP. D. Public Participation A draft copy of this Plan will be made available on the City’s website. The public will be notified and encouraged to provide comments and questions. E. Updates to Plan This Plan is required to be reviewed every five years and updated as necessary. A new WSSAP will need to be created by 2045 before the end of the planning period. Page 48 of 58 STEVENS POINT, WISCONSIN WATERWORKS REPORT FOR DECEMBER 2025 CURRENT YEAR VS. PREVIOUS YEAR 2024 2025 INCREASE DECREASE RECORD HIGH/LOW DATE Total pumpage, gallons 172,688,000 166,903,000 5,785,000 201,625,000 12/1/2003 Daily pumping average, in gallons 5,570,000 5,383,970 186,030 Peak pumpage, gallons, (date) 6,660,000 8,205,000 1,545,000 8,837,000 12/2/2001 (3RD) (11TH) Low pumpage, gallons, (date) 3,861,000 3,706,000 155,000 1,270,000 12/25/1970 (4TH) (10TH) 2,265,000 12/25/2012 ◄Record low since 1995 when the utility started providing water Power bill $21,119.30 $20,283.35 $835.95 $21,119.30 Dec-24 to Stora Enso. K.W.H's used 231,414 226,679 4,735 Gallons pumped per K.W.H. 854 736 118 F:\123R3\WATERWORK REPTS\WATERWRK-Dec 25.xlsx Page 49 of 58 MONTH 2025 2024 2023 2022 2021 2020 2019 2018 2017 2016 JANUARY 191,525 190,129 178,957 188,381 138,644 150,622 142,263 147,206 140,438 131,056 FEBRUARY 174,855 200,341 173,997 173,503 135,391 131,127 135,573 132,869 123,311 124,330 MARCH 182,380 197,093 169,879 195,466 150,690 138,327 154,358 148,770 139,881 131,189 APRIL 176,085 194,614 167,050 171,871 146,563 127,470 135,713 133,238 142,367 135,484 MAY 215,675 207,278 208,084 211,721 174,529 149,292 154,346 168,410 141,687 175,174 JUNE 229,512 228,814 284,930 238,070 225,268 181,763 181,220 187,095 175,722 187,693 JULY 237,122 232,529 280,293 261,545 214,800 199,876 199,645 240,487 202,817 185,672 AUGUST 226,475 241,404 275,018 251,597 206,429 231,447 210,777 225,280 179,208 167,623 SEPTEMBER 220,162 219,734 239,167 227,586 181,626 174,925 169,779 181,556 157,626 151,238 OCTOBER 186,924 189,354 177,717 206,986 188,859 170,759 143,805 148,186 151,878 143,498 NOVEMBER 165,376 166,568 194,002 191,454 169,636 151,193 135,482 133,317 137,452 126,023 DECEMBER 166,903 172,688 182,805 194,570 186,582 139,795 146,329 143,324 133,796 141,554 Grand Total/Yr 2,372,994 2,440,546 2,531,899 2,512,750 2,119,017 1,946,596 1,909,290 1,989,738 1,826,183 1,800,534 STEVENS POINT WATER DEPARTMENT CONSUMPTION HISTORY (Pumpage x 1,000) F:\123R3\PUMPAGE 2016- 2025.xlsx Page 50 of 58 MONTH 2025 2024 2023 2022 2021 2020 2019 2018 2017 JANUARY 89,445 89,029 88,937 88,942 83,106 82,287 82,112 88,989 89,079 FEBRUARY 79,592 83,297 79,725 80,355 80,293 83,129 80,253 80,441 80,474 MARCH 88,798 82,726 81,120 88,834 88,768 88,771 88,609 76,469 88,652 APRIL 85,446 86,122 84,933 84,742 86,110 86,022 84,640 86,223 76,187 MAY 89,075 88,543 88,563 88,861 88,978 88,891 88,880 88,968 66,836 JUNE 85,529 90,926 93,567 85,473 86,219 86,029 85,990 86,098 74,224 JULY 93,325 98,263 98,201 89,341 89,195 86,944 88,225 88,869 88,996 AUGUST 88,295 98,269 98,201 89,417 88,490 88,902 88,811 88,978 88,973 SEPTEMBER 86,386 78,157 88,166 86,525 86,109 86,044 85,974 86,010 86,157 OCTOBER 87,789 85,933 88,652 89,828 86,373 88,916 88,841 87,366 89,120 NOVEMBER 86,345 76,273 86,218 86,211 86,217 82,881 85,244 85,751 86,441 DECEMBER 88,891 89,129 88,973 89,035 89,444 88,909 88,890 87,468 72,909 Grand Total/Yr 1,048,916 1,046,667 1,065,256 1,047,564 1,039,302 1,037,725 1,036,469 1,031,630 988,048 STEVENS POINT WATER DEPARTMENT WELL 11 PUMPAGE HISTORY (Pumpage x 1,000) F:\Commission Meetings\Well 11 Pumpage.xlsx Page 51 of 58 Final Effluent Discharge Data December 2025 Sewage Flow BOD S.S. Phosphorus Fecal Effluent Raw Final Raw Final Raw Final Raw Final Raw Final Coliform Ammonia Precip CBOD % Pounds Pounds Raw Final % Pounds Pounds Raw Final Pounds Pounds Final Date INCHES MGD MGD MG/L MG/L Reduct. BOD/Day CBOD/Day (ppm) (ppm) Reduct. SS/Day SS/Day (ppm) (ppm) P/Day P/Day #/100 ml mg/L 12/01/2025 0.00 2.113 2.148 345 7.76 98 6,080 139 376 5.74 98 6,626.03 103 12/02/2025 0.04 2.192 2.264 277 8.29 97 5,064 157 240 6.99 97 4,387.51 132 23 12/03/2025 0.02 2.266 2.519 393 8.23 98 7,427 173 228 6.86 97 4,308.84 144 6.700 0.230 127 5 29 12/04/2025 0.00 2.218 2.533 195 8.37 96 3,607 177 216 5.94 97 3,995.59 125 43 12/05/2025 0.00 2.176 2.526 281 4.53 98 5,100 95 344 7.06 98 6,242.86 149 6.160 0.240 112 5 52 12/06/2025 0.05 2.040 2.390 263 4.43 98 4,475 88 300 5.94 98 5,104.08 118 5.690 0.220 97 4 58 12/07/2025 0.05 2.082 2.408 266 3.79 99 4,619 76 304 5.99 98 5,278.62 120 12/08/2025 0.00 2.224 2.562 353 4.72 99 6,548 101 288 6.43 98 5,341.87 137 12/09/2025 0.06 2.219 2.589 358 4.38 99 6,625 95 292 5.79 98 5,403.89 125 45 12/10/2025 0.55 2.170 2.545 374 3.98 99 6,769 84 288 5.59 98 5,212.17 119 35 12/11/2025 0.00 2.218 2.600 332 3.93 99 6,141 85 352 6.60 98 6,511.34 143 6.990 0.680 129 15 40 12/12/2025 0.00 2.156 2.399 296 4.45 98 5,322 89 236 5.40 98 4,243.53 108 6.230 0.560 112 11 31 12/13/2025 0.01 1.990 2.032 257 3.67 99 4,265 62 220 4.60 98 3,651.25 78 12/14/2025 0.00 2.007 2.044 236 3.25 99 3,950 55 204 5.00 98 3,414.63 85 5.650 0.490 95 8 8 12/15/2025 0.00 2.203 2.247 323 4.44 99 5,934 83 248 4.80 98 4,556.51 90 12/16/2025 0.00 2.230 2.305 339 4.21 99 6,305 81 256 5.00 98 4,761.14 96 8 12/17/2025 0.00 2.211 2.281 274 3.47 99 5,052 66 240 4.60 98 4,425.54 88 6.410 0.182 118 3 6 12/18/2025 0.00 2.180 2.246 486 3.93 99 8,836 74 240 3.73 98 4,363.49 70 6 12/19/2025 0.11 2.072 2.113 359 3.99 99 6,204 70 296 4.60 98 5,115.02 81 6.160 0.182 106 3 8 12/20/2025 0.00 1.929 1.978 150 3.65 98 2,413 60 80 4.20 95 1,287.03 69 3.330 0.182 54 3 6 12/21/2025 0.00 1.915 1.946 434 3.86 99 6,931 63 232 4.91 98 3,705.30 80 12/22/2025 0.11 2.017 2.080 405 4.38 99 6,813 76 276 3.31 99 4,642.81 57 4 12/23/2025 0.00 2.051 2.120 413 5.74 99 7,065 101 244 5.01 98 4,173.70 89 6.480 0.230 111 4 9 12/24/2025 0.00 1.866 1.920 299 5.81 98 4,653 93 220 4.73 98 3,423.74 76 5.470 0.230 85 4 8 12/25/2025 0.00 1.632 1.661 242 3.38 99 3,294 47 184 4.12 98 2,504.40 57 3.830 0.210 52 3 4 12/26/2025 0.04 1.850 1.906 334 4.37 99 5,153 69 240 3.53 99 3,702.96 56 4 12/27/2025 0.00 1.853 1.901 281 5.13 98 4,343 81 252 3.85 98 3,894.41 61 12/28/2025 0.02 1.906 1.979 255 4.71 98 4,053 78 188 5.15 97 2,988.46 85 12/29/2025 0.57 2.029 2.087 277 4.74 98 4,687 83 288 4.51 98 4,873.50 78 12/30/2025 0.00 1.942 1.982 329 11.70 96 5,329 193 252 5.94 98 4,081.46 98 12/31/2025 0.05 1.970 2.026 332 12.84 96 5,455 217 224 5.40 98 3,680.28 91 Total 1.68 63.927 68.337 9,758 164 3,045 168,512 3,013 7,848 161.32 3,033 135,901.93 3,010 69.100 3.636 1,197.431 68.906 425.490 Average 0.05 2.062 2.204 315 5 98 5,436 97 253 5.20 98 4,383.93 97 5.758 0.303 99.833 5.667 21.350 Maximum 0.57 2.27 2.60 486.00 12.84 99.19 8,836.06 216.96 376.00 7.06 98.80 6,626.03 148.73 6.99 0.68 129.30 14.75 57.90 Minimum 0.00 1.63 1.66 150.00 3.25 95.71 2,413.18 46.82 80.00 3.31 94.75 1,287.03 56.11 3.33 0.18 52.13 2.91 3.58 Page 52 of 58 BOD Raw 2 Year History BOD Raw Actual Monthly Average (Mo Avg) BOD Raw Design Monthly Average (Mo Avg) LBS Date ( 01/01/2024 to 12/31/2025 ) 0 800 1600 2400 3200 4000 4800 5600 6400 7200 8000 8800 9600 10400 11200 12000 Jan '24 Mar '24 May '24 Jul '24 Sep '24 Nov '24 Jan '25 Mar '25 May '25 Jul '25 Sep '25 Nov '25 Jan '26 WIMS (OPSSP_WWTP) BOD Raw 2 Year History Page 53 of 58 SS Raw 2 Year History SS Raw Actual Monthly Average (Mo Avg) SS Raw Design Monthly Average (Mo Avg) LBS Date ( 01/01/2024 to 12/31/2025 ) 0 800 1600 2400 3200 4000 4800 5600 6400 7200 8000 8800 9600 10400 11200 12000 Jan '24 Mar '24 May '24 Jul '24 Sep '24 Nov '24 Jan '25 Mar '25 May '25 Jul '25 Sep '25 Nov '25 Jan '26 WIMS (OPSSP_WWTP) SS Raw 2 Year History Page 54 of 58 Phosphorus mg/l 2 Year History Effluent Phosphorous Total (Mo Avg) Phosphorus Final Limit (Mo Avg) MG/L Date ( 01/01/2024 to 12/31/2025 ) 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.9 1.0 1.1 1.2 1.3 1.4 1.5 1.6 Jan '24 Mar '24 May '24 Jul '24 Sep '24 Nov '24 Jan '25 Mar '25 May '25 Jul '25 Sep '25 Nov '25 Jan '26 WIMS (OPSSP_WWTP) Phosphorus 2 Year History Page 55 of 58 Effluent Ammonia mg/l 2 Year History Effluent Ammonia (Mo Avg) Effluent Ammonia Limit (Mo Avg) MG/L Date ( 01/01/2024 to 12/31/2025 ) 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 Jan '24 Mar '24 May '24 Jul '24 Sep '24 Nov '24 Jan '25 Mar '25 May '25 Jul '25 Sep '25 Nov '25 Jan '26 WIMS (OPSSP_WWTP) Effluent Ammonia 2 Year History Page 56 of 58 Sewage Plant Monthly Average Temperature Precip. Sewage Flow Phosphorus BOD Suspended Solids Per Day Gas Max Min Influent Effluent Raw Influent Final Effluent Raw Influent Final CBOD Eff. Reduction Raw Influent Final Effluent Reduction Power LBS BOD Production Month ° F ° F INCHES MGD MGD MG/L LBS MG/L LBS MG/L LBS MG/L LBS % MG/L LBS MG/L LBS % kW Removed Per Day CUFT Jan 2025 23 11 0.25 2.123 2.395 5.427 94 0.318 6 291 5,157 5.52 110.25 98 247 4,378 4.81 96.00 98 6,587 5,046 Feb 2025 26 7 0.85 2.073 2.314 6.416 111 0.452 9 332 5,748 7.23 139.59 98 290 5,011 10.05 193.90 96 6,914 5,609 Mar 2025 46 24 4.88 2.255 2.563 5.675 101 0.225 5 291 5,477 5.62 120.11 98 255 4,805 5.05 107.86 98 6,703 5,356 Apr 2025 54 33 4.26 2.782 3.173 4.022 90 0.310 8 257 5,958 6.21 164.34 98 232 5,390 7.44 196.96 97 6,433 5,794 May 2025 67 44 2.15 2.553 2.925 4.437 93 0.317 8 266 5,655 2.83 69.04 99 276 5,868 4.03 98.37 98 7,548 5,586 Jun 2025 76 58 5.45 2.335 2.682 5.498 106 0.125 3 286 5,565 3.50 78.29 99 282 5,494 2.64 59.12 99 7,320 5,487 Jul 2025 83 62 4.07 2.349 2.556 5.056 100 0.124 3 283 5,536 3.40 72.50 99 296 5,806 3.61 76.88 99 6,277 5,464 Aug 2025 77 58 3.29 2.310 2.499 4.765 92 0.388 8 289 5,571 3.62 75.47 99 281 5,422 5.07 105.62 98 6,135 5,495 Sep 2025 74 52 1.93 2.318 2.591 5.830 113 0.310 7 314 6,073 5.31 114.66 98 297 5,736 5.76 124.51 98 6,853 5,958 Oct 2025 64 42 1.32 2.199 2.477 6.218 112 0.314 6 313 5,741 4.84 99.95 98 325 5,959 5.53 114.27 98 6,123 5,641 Nov 2025 44 25 0.86 2.086 2.271 5.288 92 0.187 3 281 4,897 3.92 74.23 99 243 4,233 4.57 86.59 98 5,200 4,822 Dec 2025 26 9 1.68 2.062 2.204 5.758 100 0.303 6 315 5,414 5.29 97.34 98 253 4,354 5.20 95.67 98 6,355 5,316 Minimum 23 7 0.25 2.062 2.204 4.022 90 0.124 3 257 4,897 2.83 69.04 98 232 4,233 2.64 59.12 96 5,200 4,822 Maximum 83 62 5.45 2.782 3.173 6.416 113 0.452 9 332 6,073 7.23 164.34 99 325 5,959 10.05 196.96 99 7,548 5,958 Total 660 425 30.99 27.446 30.650 64.389 1,204 3.373 72 3,518 66,791 57.29 1,215.76 1,180 3,278 62,457 63.76 1,355.74 1,175 78,450 65,576 Average 55 35 2.58 2.287 2.554 5.366 100 0.281 6 293 5,566 4.77 101.31 98 273 5,205 5.31 112.98 98 6,537 5,465 Page 57 of 58 January 2026 Meeting December Utility Construction and Maintenance Report 1. Contracted Road/Utility Construction Progress: • Village of Park Ridge water main/road project, complete, punch list items remain • Washington Ave. (Project 25-101) complete, punch list items remain • Madison St./Monroe St. (Project 25-102) complete, punch list items remain • Public Works re-paving Country Club Dr. complete, punch list items remain • Fiber ring from UWSP to P.D. to Transit in progress, directional boring complete, fiber splicing/patching projected for January • 2026 Public Works re-paving Green Ave. (Utility structure adjustments only) • 2026 Public Works repaving Northpoint Dr. from Stanley St. to Wilshire Dr. (utility structure adjustments only, potential water and sewer extension) • 2026 Michigan St. underpass reconstruct from Dixon St. to Patch St. • 2026 Division St reconstruct from Northpoint Dr. to Briggs St. • 2026 Church St. reconstruct from Heffron St. going south to City limits 2. Utility Maintenance Activities: • Televising, cut, jet, flush as normal (pending weather) • Winter Operations • Snow Removal Duties • Fire Hydrant Checks • Inventory Counts • Equipment Maintenance • Building PM’s 3. Future Construction and Maintenance Projects: • Swale Heffron St. - 2026 • Swale Woodland St. - 2027 4. Emergencies/Pager Calls: • (4) After hours pager calls in December 5. Training: • February will have multiple safety sessions given by CVMIC • (3) Employees scheduled for DNR water certification classes & exams in March Page 58 of 58

Source: City of Stevens Point website. First collected Oct 30, 2026.