Highway Committee — Agenda Packet
Portage County · Portage County · Highway Committee · meeting of Feb 17, 2026 · Agenda packets
Open the original document More from Portage County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
PORTAGE COUNTY
MEETING AGENDA
HIGHWAY COMMITTEE
PORTAGE COUNTY ANNEX
CONFERENCE ROOMS 1 & 2
1462 STRONGS AVENUE
STEVENS POINT, WI 54481
Tuesday, February 17, 2026 3:30 PM
REMOTE ATTENDANCE & COMMENT
To attend this meeting by telephone : dial 1-872-242-7813, after dialing the number you will then be asked to enter in a
meeting number. Use the following meeting number: 311 513 809, then press #
To attend this meeting by video: Join the meeting now
Page 1 of 2
CALL TO ORDER
CORRESPONDENCE
1. Portage County Highway Department Seasonal Weight Limit Variance Permit Policy
2. WI Transportation Bulletin No 8 – Using Weight Limits to Protect Local Roads
3. WisDOT Email regarding Coordination Document
4. Resolution for Support for Enacting a Comprehensive, Sustainable Transportation Funding Solution
5. The Transportation Fund Dilemma TDA Presentation Information
PRESENTATIONS
REPORTS
6. Special Meeting Attendance Reports (Portage County Ordinance 3.1.47 & 3.1.48)
7. Commissioner’s Report
8. Report on Purchase Under $25k – 2026 Equipment Purchase – Ironworker
PUBLIC NOTICE
Members of the public who wish to address the Committee on specific agenda items must register their request at this time,
with such comments subject to the public comment ordinance and the reasonable control of the Committee Chair as set
forth in Robert’s Rules of Order.
APPROVAL OF MINUTES
9. Approval of December 16, 2025 Minutes
DISCUSSION/POSSIBLE ACTION
10. Discussion and Possible Action on 2026 Seasonal Weight Limit Variance Permit – James Grezenski Forest Products,
Inc.
11. Discussion and Possible Action on 2026 Seasonal Weight Limit Variance Permit – Ralph Hamel Forest Products, Inc.
12. Discussion and Possible Action on 2026 Seasonal Weight Limit Variance Permit – Hintz Pallet & Repair
13. Discussion and Possible Action on 2026 Seasonal Weight Limit Variance Permit – Portage County Solid
Waste/Crockett Septic, LLC
Page 1 of 88
Highway Committee Meeting Agenda February 17, 2026
Page 2 of 2
14. Discussion and Possible Action on 2027 Equipment Purchase – Truck Chassis
15. Discussion and Possible Action on 2027-2031 Highway Capital Improvement Plan
NEXT MEETING DATE
ADJOURNMENT
Notice: Any person who has special needs and plans on attending this meeting in-person or remotely should contact the Facilities at 715-
346-1598 as soon as possible to ensure that reasonable accommodations can be made.
Notice: Remote comment by the public during the meeting will be at the discretion of the Chair.
Notice: A quorum of the Portage County Board of Supervisors, or any committee thereof, may be present at this meeting.
Page 2 of 88
Portage County 800 Plover Road
Highway Department Plover, WI 54467
Nathan Check, P E Phone: 715-345-5230
Commissioner Fax: 715-345-5356
County Engineer – Lucas Meddaugh
Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Assistant Patrol Supervisor – Bob Lang Parts Room/Shop Manager – Corey Giese
Portage County Highway Department Seasonal Weight Limit Variance Permit Policy
Fee
To offset the costs involved in seasonal weight limit variance permit review, the following fees
are established:
1. Single Trip Perishable and Public Health Emergency - $40.00
2. Multiple Trip Perishable and Public Health Emergency - $105.00
3. Single Trip Review Required by Highway Committee- $100.00
4. Multiple Trip Review Required by Highway Committee - $250.00
Statement of Purpose
The Portage County Highway Department will provide a safe and economical transportation
system for the traveling public and the taxpayers of Portage County. In order to protect the
County’s valuable infrastructure, seasonal weight restrictions are imposed during times when the
roadbed experience weakness due to their existing conditions and deterioration during climatic
conditions. In the absence of these postings, the County’s infrastructure
would likely be
seriously damaged or destroyed.
Authority
The Portage County Highway Commissioner may impose special seasonal weight restrictions on
any county trunk highway that, because of weakness of the roadbed due to deteriorating or
climatic conditions or other special or temporary conditions, would likely be seriously damaged
or destroyed in the absence of such special limitations. This is done in accordance with Wis.
Stats. Section 349.16.
S
easonal weight restrictions usually apply only during those times when the roadbed is becoming
unfrozen. The posted limits normally are six tons gross load for single-axle vehicles and ten tons
for tandem-axle vehicles. All annual or single-trip overweight travel is not permitted during this
time on posted road sections, in accordance with Wis. Stats. Section 348.17.
Imposition of Special Weight Limitations
Signs shall be erected on or along the highway section on which special weight limitations are
imposed. Reasonable notice that a special weight limitation is in effect and the nature of that
limitation shall be given at both ends of the highway section. The limits of posted highway
sections should be chosen so as to allow vehicles to choose an alternate route without having to
perform a u-turn. All signs and their installation should be in accordance with the rules of the
department and should be standard with other weight-limitation signage.
Page 3 of 88
Portage County 800 Plover Road
Highway Department Plover, WI 54467
Nathan Check, PE Phone: 715-345-5230
Commissioner Fax: 715-345-5356
County Engineer – Lucas Meddaugh
Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Assistant Patrol Supervisor – Bob Lang Parts Room/Shop Manager – Corey Giese
The following county trunk highways are not posted with seasonal weight restrictions as they
have been constructed to Class A standards:
1. CTH P (Wood County Line to CTH HH)
2. CTH HH(CTH P to CTH R)
3. CTH B (STH 54 to CTH KK)
4. CTH R (USH 10 to Porter Road)
5. CTH Q (STH 161 to CTH KK)
6. CTH KK (USH 10 to CTH A)
7. CTH BB (STH 54 to Waushara County Line)
8. CTH D (I-39 to CTH A)
9. CTH J (STH 66 to Burr Oak Road)
10. CTH R (CTH B to 150’ north of Roosevelt Drive)
Procedure
1. Prior to the start of the spring thaw period, the effective date of the seasonal weight
restrictions will be publicized by notice at the department’s Internet web site by the Portage
County Highway Commissioner. Press releases will also be sent to local media outlets by the
Commissioner.
2. The lifting of posted road restrictions will depend on roadway temperature and road
conditions, will be publicized by notice at the department’s Internet web site. Press releases will
also be sent to local media outlets by the Commissioner.
Exemptions
The department has exempted certain vehicles from the seasonal postings since such exemptions
are reasonable and necessary to promote the public health, safety, or welfare. These exemptions
include:
1. School buses
2. Tow vehicles
3. Government Public Works vehicles
4. Vehicles used to transport materials pumped from a septic or holding tank may be
declared exempt from posted road restrictions by the Department if, because of health
concerns, materials need to be removed from a septic or holding tank within 24 hours
after the vehicle operator is notified. Within 72 hours after operating such a vehicle,
the operator of the vehicle shall notify the Department that the vehicle traveled over a
posted road.
Page 4 of 88
Portage County 800 Plover Road
Highway Department Plover, WI 54467
Nathan Check, PE Phone: 715-345-5230
Commissioner Fax: 715-345-5356
County Engineer – Lucas Meddaugh
Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Assistant Patrol Supervisor – Bob Lang Parts Room/Shop Manager – Corey Giese
Variance Permits
The department may grant seasonal weight limit variance permits for vehicles carrying certain
commodities. When considering approval of permits, the applicant shall provide reasonable
explanation on why the commodities are not divisible and the shortest route utilizing county
trunk highways shall be followed.
The Highway Commissioner has the authority to approve and issue variance permits for
perishable
1 goods and for public health emergencies. The Highway Committee has the authority
to define which items are perishable and non-perishable. These items include:
1. Milk
2. Cucumbers
3. Potatoes – production and seed
4. Refrigerated food products and ingredients
5. Animal Feed
6. Paper Rolls
7. Cattle hauled to market
Items not considered perishable and not eligible for a variance permit include:
1. Potato waste product
2. Seed
3. Fertilizer
4. Liquid Propane and Bulk Fuel
5. Construction materials and equipment
All perishable items must be transported from origin to destination.
The Highway Commissioner also has the authority to approve, and issue permits in cases of
public health emergencies such as emergency utility repairs.
The Highway Committee has the authority to approve seasonal weight limit variance permits for
all other items not considered perishable or a public health emergency. These items include:
1. Raw and Finished forest products
2. Single Trip, non-divisible loads less than 2 miles in length
Policy Approved by Portage County Highway Committee, February 14, 2017, amended at February 28,2017,
February 6, 2018, April 20, 2021, March 18, 2025 meetings.
1Perishable as defined by Merriam- Webster’s dictionary shall be: liable to perish : liable to spoil or decay <such
perishable products as fruit, vegetables, butter, and eggs>.
Page 5 of 88
Wisconsin’s extensive local road system is a lifeline for
our state and local economies. Farms and businesses
depend heavily on these roads to move manufactured,
forest and agricultural products. Highway and street
agencies need them to economically transport road-
building materials. The public also relies on truck trans-
portation to receive goods at reasonable prices.
However, heavy truck loads can damage local road
pavements, especially in spring when they are weakened
because they are saturated with water.
Local officials have a responsibility to preserve our
investment in roads by protecting them from excess
damage caused by trucks carrying heavy loads. They
have the authority to restrict truck weights under state
statutes. However, local officials must carefully balance
the public good in protecting roads against the legitimate
need for efficient transportation.
We can’t do anything to control the weather, but we
can regulate how much weight is carried on certain
roads, especially during spring thaw. According to a
national study by the Federal Highway Administration
(FHWA), reducing truck weights by just 20% between
late February and early May can increase the life of vul-
nerable pavements by 62%. Cutting weights in half
increases pavement life by 95%. To be most effective,
truck weight control programs should be coordinated
with the Wisconsin Department of Transportation,
adjoining local road agencies, the trucking industry, and
the public.
This bulletin describes the causes of spring weakness
in roads, how heavy loads do damage, and the charac-
teristics of vulnerable roads. Techniques are introduced
for determining which roads need protection in spring
and when roads are vulnerable, along with guidelines on
how to set weight limits. Year round restriction on roads
and bridges is also discussed briefly. Another Wisconsin
Transportation Information Bulletin, HowTVehicleTLoads
AffectTPavementTPerformance,T No.To,Tdiscusses in more
detail how heavy trucks damage pavements.
How freezing affects pavements
A road’s design is based on a reasonable estimate of the
average loads it will carry during its projected life. That
is why Interstate highways carrying thousands of trucks
a day have thick concrete pavements while rural roads,
built for local traffic and a few trucks, are often a few
inches of compacted gravel or asphalt laid on a shallow
base. Soil types and local drainage characteristics also
affect design and load capacity.
To build roads, designers use calculations based
on strength and moisture tests of the natural soil or
subgrade. The road base and surface depth are then
designed for the average condition. Roads can be
designed for the worst soil conditions but the cost is
usually not justified by the expected use.
When the weather gets cold, pavements and the
water trapped within them freeze near the surface. As
cold temperatures persist and go lower, the frost line
moves deeper into the soil. Frost depth may range from
relatively minor—one or two feet during mild winters in
southern Wisconsin—to extremes of five to eight feet
during severe winters in the northern part of the state.
Using Weight Limits to Protect Local Roads
WisconsinrTransportationrBulletinr•rNo.r8
1
Asrspringrthawrweakensrpavements,rtrucksrcarryingrheavyrloads
canrdamagerthem.
Page 6 of 88
Frostractionrandrfrostrheaves
Pavements can be severely damaged in winter by frost
heaves from water freezing in the soil. Damage can be
particularly bad when the heaving is greater in one
pavement section than another or when it occurs next
to structures that don’t move, like bridges or manholes.
There are three critical factors in frost heave: freezing
temperatures, a source of water, and susceptible soils.
Frost heave results not just from the natural expansion
of water as it freezes, but from the buildup of a series of
ice layers, called lenses, that form at the freezing front as
it penetrates downward. This can cause heaves of a few
inches to several feet.
Water comes from the normal water table. Problems
are more severe when the water table is near the pave-
ment surface, but significant frost heaving can occur
even when it is many feet below the actual frost depth.
Frost-susceptible soils are fine-grained like silt and
clay. These permit water to move from the water table to
the freezing front through capillary action. Silt is usually
the worst because it has enough capillary action to move
water and its pore spaces are big enough to transmit
large amounts of water. Granular soils like sand have
relatively large pore spaces which generally do not have
sufficient capillary action to be frost susceptible.
Springrthaw
In spring, roads begin to thaw from both the top and bot-
tom. As ice in the pavement melts, water saturates the
road’s base and subgrade. These layers lose strength, like
a handful of mud compared to dry soil. As thawing con-
tinues, melt water becomes trapped in the upper sub-
grade, unable to drain away through the frozen soils
below. Pavements weaken considerably in a very short
time under these conditions.
The weakness can continue for weeks or months after
the pavement is completely thawed. It takes a long time
for water to leave the pavement because frost-susceptible
silt and clay soils are relatively slow to drain.
How heavy vehicles damage roads
Without adequate support, a pavement or gravel surface
deflects too much under trucks carrying heavy loads,
developing cracks or ruts. These then let more moisture
penetrate, worsening the cycle until the road fails
completely. The amount of damage a road sustains is
directly related to the weight of the load and how
often it is applied, according to tests by AASHTO (the
American Association of State Highway and Transporta-
tion Officials). Passenger autos and light duty vehicles
are not a problem. It is trucks carrying legal weight loads
of up to 80,000 GVW over weakened surfaces which do
the damage. When trucks carry loads that are heavier
than the statutory weight limit, the potential for damage
is much higher.
Another factor is the amount of weight and number
of tires on each axle. Damage increases rapidly with
higher axle loads and actually worsens at a faster rate
than the load increases. A nine-ton axle load, for
example, causes about ten times more damage than a
five-ton axle load. Distributing a vehicle’s weight and its
payload over more axles and tires makes the load lighter
at each point of contact, reducing damage to the road.
However, low-inflation tires do not protect roads
from damage. It has been commonly assumed that large
loads carried by off road equipment would have little
adverse affect because they have flotation tires or treads
that allow them to work in soft soils. In actual field tests,
the South Dakota DOT showed that off road equipment
with axle loads that exceeded legal limits caused
damage to asphalt, sealcoat, and gravel roads and
shortened pavement life.
Imposing restrictions on truck weight limits is a
reasonable and practical way to protect vulnerable local
roads when they are at their weakest. Spring weight
limits should begin with the first thawing and continue
until the pavement is again strong enough to carry
normal loads.
2
WINTER SPRING SUMMER FALL
STRENGTH
Restrict
Load
Variationrinrpavementrstrengthrthroughoutrtheryear.
Page 7 of 88
Choosing roads for spring
weight restrictions
Consider the following factors in deciding which roads
or segments should have restrictions.
•PavementTthicknessTAsphalt surfaces of two inches
or less, or total pavement less than 12 inches thick.
•TypeTofTsubgradeFine-grained subgrade soils, like
silts and clays, and areas with a high water table
and poor drainage.
•PastTexperienceAreas with alligator cracking or
rutting that break up every year and need frequent
patching and repair.
•AmountTandTtypeTofTtruckTtrafficConsider all truck
traffic and especially seasonally higher volumes of
trucks carrying heavy loads.
•SurfaceTdeflectionTPavement sections where the
surface deflects or bends 50% more during spring
thaw than in summer. Also, increased deflection
lower than 50% on weaker pavements where
summer deflections are relatively high.
•PavementTage/conditionWeight restrictions can
protect your investment in new pavements and
prolong the life of weak or aging pavements.
Year round restrictions —
Class II and Class B roads
All public roads are considered to be Class A unless des-
ignated otherwise. Vehicle weight restrictions established
in Chapter 348 are intended for travel on Class A high-
ways. Some roads, designated Class II or Class B, have
permanent weight restrictions, with some exceptions.
The state may designate certain highways as Class II.
These are limited to legal loads. No overloads are
allowed, even when the hauler has an overload permit.
About 1600 miles of state highway, mostly in the north
and west, are Class II.
State, county and local authorities may designate all
or a portion of their systems as Class B highways under
Sections 349.15 and 349.16, Wisconsin Statutes. This
designation reduces the permitted weight, year round,
not to exceed 60% of the legal load limits. It takes effect
when signs are posted and remains in effect until the
signs are removed.
Two types of loads are exempted under Class B desig-
nation. The rules now allow local pick-up and delivery
of full legal loads. Also, waste haulers can haul their full
legal load if, because of health concerns, the material
must be removed from a septic or holding tank within 24
hours and if they minimize their travel on the weight-
restricted roads.
Class B highway designation, which in general is
permanent, not seasonal, is intended for situations where
the pavement cannot withstand normal, legal truck
weights. Such roads may not have been constructed to
adequately handle these loads, or they may be roads
through low areas with poor supporting soils. The Class
B designation is well understood by industry. It is a
reasonable option for local authorities when they believe
it is necessary to protect pavement. WisDOT recognizes
this local authority through administrative code. For
example TRANS 255.12(6) requires explicit written
permission for movement on Class B local roads even
if a state permit has been issued.
Posting reduced load limits, such as a 24-ton limit,
is an alternative for protecting roads in weak condition.
Local officials may choose this option if the exemptions
which were added in 2002 to Class B for local pickup
and delivery are unacceptable.
Some bridges may also need protection. Although
their strength is not affected by freezing, bridges may be
weakened by age. Load limits should be determined by
a competent bridge inspector or consulting engineer. As
with roads, local agencies have authority to post weight
limits for bridges under Chapter 349 of the Wisconsin
Statutes. In addition to a sign at the bridge, there must
be an advance warning sign at the nearest intersection.
Determining weight limit
reductions
Aweight reduction of just 20% during critical weeks in
March and April can make a major difference in pave-
ment life according to a study by the Federal Highway
Administration. As weights are reduced further, potential
pavement life increases even more.
Local agencies have the authority to determine
seasonal weight limits on their road systems. About
50% of the normal limit is typical, but establishing limits
that are consistent with those set by the state DOT and
adjoining agencies on nearby roads is strongly recom-
mended. For state highways WisDOT normally uses a
3
Page 8 of 88
spring weight limit of six
tons per single axle and
10 tons per tandem axle.
To be effective, loads
should be reduced at least
20%, while reduction over
60% may have little added
benefit. Nationally, the
average reduction is 44%
which would lengthen
pavement life by about 88%, according to study results.
Consider other factors also, however. Thin or weak
pavements may need significant reductions during spring
thaw; small or even modest load reductions will not
prevent damage.
Since limits will be ineffective if local haulers do not
cooperate with them, the most effective restrictions are
reasonable and directly related to pavement damage.
Otherrremedialractions
Along with restricting load limits, consider other ways of
protecting pavements. When haulers seek exemptions,
consider including special requirements. For example,
a load could be made in two smaller loads. The route
could be modified so that pick-up or delivery is made
at the start or end, or so that the route is traveled in a
different direction. The goal is to minimize the length of
travel and number of truck loads on weak road sections.
Another common approach to exceptions is to
require that deliveries be made at night or in the early
morning when roads may be stronger due to overnight
freezing. Be careful not to overuse this approach. If
substantial subgrade thawing has started, a light frost
in the pavement surface offers limited value.
Physical changes can also help. For
example, where pavements are shaded,
you can increase exposure to sunlight
by removing trees, billboards or other
obstacles. Eliminate standing water in
roadside ditches and fill pavement
surface cracks to reduce the amount
of water getting to the freezing zone.
Improve drainage in the roadbed by
removing frost susceptible soils. A three
foot combined depth of pavement and
replacement base will prevent substantial
subgrade freezing in the coldest winter in
10, according to the 1993 AASHTO
DesignTGuide.
Install geosynthetics between the
free water layer and the freezing zone.
Optimal placement depth and whether
multiple layers are needed remains to
be determined, however. Geosynthetic
reinforcements may also limit damage during spring
thaw by helping bridge weak areas and limiting pave-
ment spread.
When to begin restrictions
It can be difficult to determine when the thaw begins.
In Wisconsin, it generally starts in early March and is
complete by early May. According to 38 years of data
from the Wisconsin Department of Transportation
(WisDOT), the average date for legal load restrictions
on some state highways is March 10. Posting usually
begins between March 1–8 in the southern half of the
state and March 12–18 in the north. The posted road
period generally ends between April 25–May 1 in the
south and May 1–14 in the north. However conditions in
the state can vary considerably from north to south, and
even from road to road in the same county. Unusually
warm winters also affect road posting dates. Local
knowledge of typical thaw periods is extremely helpful.
Since a uniform system of spring weight restrictions
is more understandable and enforceable, it is vital to
coordinate with the Wisconsin DOT, the county, and
adjoining road agencies. Also, when weight limits are
not uniform or when some communities post limits
and others don’t, vulnerable unposted roads may be
damaged by truck traffic taking alternate routes.
Local officials should time their road postings to
coincide with the spring weight restrictions that WisDOT
posts on the state highway system. The county highway
department, WisDOT district maintenance office, and
the WisDOT central maintenance office can tell you
when they will begin.
4
Feb 15
Mar 1
Mar 15
Apr 1
Apr 15
May 15
Jun 1
May 1
1966
1970
1974
1978
1982
1986
1990
1994
1998
2002
Ending dates of
weight restriction
Starting dates of
weight restriction
Wisconsin Spring Weight Limits Season on Class II Road Sections
Load Increase in
reduction pavement life
20% 62%
30% 78%
40% 88%
50% 90%
Page 9 of 88
To decide on a posting date, WisDOT uses informa-
tion from frost tubes buried in pavements around the
state. A liquid in the tubes changes color when it freezes.
District maintenance staff check the tubes periodically to
determine frost depth and location.
There are also about 60 automatic pavement and
weather monitoring stations in place around the state.
By watching reports from these stations on pavement
surface temperatures and at 18 inches below the surface,
county and state highway staffs can better predict when
spring thawing is underway.
For local roads, you generally must use judgment and
experience. However, a Thawing Index (TI)—calculated
like heating degree days used by winter fuel suppliers—
can help you predict when to begin restrictions. Figuring
thawing degree days involves recording daily high and
low air temperatures in your community and making a
simple calculation. For weaker or problem pavements
you may want to record daily highs and lows at the site.
Studies also show that the Thawing Index is more reli-
able for fine-grained soils than coarse-grained ones.
Begin using the Thawing Index when the average
daily temperature rises above 29° F—chosen as a
reference temperature because tests show that an asphalt
pavement surface is 32° F when air temperature is about
29° F. For midwinter thaws, use 31° F as the reference
temperature for the Thawing Index because of lower sun
angle and increased cloud cover in midwinter.
You can use high and low temperature predictions
from a five-day advance weather forecast to project
when load restrictions must take effect. This will allow
you to prepare the public and alert local heavy haulers.
Pavement thickness determines how many thawing
degree days are needed for applying spring load restric-
tions. The FHWA study GuidelinesTforTSpringTHighway
UseTRestrictionshas established “should” and “must”
Thawing Index levels for thick and thin pavements (see
below). The “should” level estimates thaw to the bottom
of the base course. The “must” level estimates thaw to
about four inches below the bottom of the base course.
When to remove restrictions
In general, keep weight restrictions in place until soils
are completely thawed and drained to normal moisture
levels. The most accurate way to tell is by testing for
5
Usual southern
thawing season:
from March 1–8
to April 25–May 1
Usual northern thawing season:
from March 12–18 to May 1–14
90
90
94
94
94
43
43
94
53
53
51
51
45
45
141
8
8
29
18
151
151
10
Prairie
du Chien Madison
Beloit Kenosha
Milwaukee
Portage
Oshkosh
La Crosse
Manitowoc
Appleton
Green Bay
Eagle River
Wausau
Marshfield Stevens
Point
Wisconsin
Rapids
Ashland
Superior
Rice Lake
Hudson
Eau ClaireOsseo
Thawingrconditionsrcanrvaryrconsiderablyrfromrnorthrtorsouth.
Thawing Index levels for posting load restrictions on asphalt
Pavement structure Thawing Index
“Should”rLevel “Must”rLevelr
THINAsphalt 2” or less 10° F-days 40° F-days
Base course 6” or less
THICKAsphalt more than 2” 25° F-days 50° F-days
Base course more than 6”
Thawing
Index
Average Daily
Temperature
Reference
Temperature
= 4° F–days TI 33° F – 29° F
MINUS EQUALS
Compute Thawing Index (TI)
100
0
100
0
High Low Average Daily
TemperaturePLUS DIVIDED
BY TWO
Compute average daily temperature
28° F ÷ 2 38° F + = 33° F
100
0
100
0
EQUALS
Day 1: 33° F - 29° F = 4° F-days
Day 2: 35° F - 29° F = 6° F-days
2-day TI total: 4 + 6 = 10° F-days
1) Determine the average
daily temperature by
adding the day’s high
and low temperatures
and dividing by 2.
2) Subtract the reference
temperature (29° F for spring
thawing or 31° F for midwinter
thaws) from the Daily Average
Temperature. The remainder is
the TI for that day.
CalculatingrtherThawingrIndex
Sample calculation of
Thawing Index for two days:
Page 10 of 88
deflection. However, combining judgement and experi-
ence with an estimate based on the Thawing Index is
very economical and will suffice in many cases.
To make this estimate you must know the Winter
Freezing Index. The Freezing Index is calculated the
same way as the Thawing Index, using 32° F as the
reference temperature. Beginning when the average
daily temperature has been below 32° F for several
days, calculate daily average temperatures. (Add the
high and the low for the day and divide by 2.) Subtract
the average daily temperature from 32° F and record the
result. Keep a running total until spring thawing begins.
This total is the winter’s freezing index in your area.
High and low temperatures reported in the local media
may also work well enough for this purpose.
To calculate the total number of thawing degree
days until the thaw is complete, multiply the Winter
Freezing Index by 0.3. For example, for a Winter
Freezing Index of 1375° F-days, the Thawing Index
would be 412° F-days: 0.3rxr1375r=r412
Implementing local weight limits
Authority
To institute a permanent weight limit on a road, the local
elected board or council should pass an appropriate
ordinance and post the necessary signs. For a temporary
restriction like spring load limits, the “authority in charge
of maintenance” can impose the limits under Section
349.16 of theWisconsinTStatutes.T
It may not be clear who is the “authority in charge of
maintenance.” It is best for the local board or council, at
a regularly scheduled meeting, to specifically identify a
person or position to have that authority. For county
trunk highways, the highway commissioner is commonly
chosen. Towns, villages or cities should designate their
highway superintendent, road foreman, street superin-
tendent, or similarly titled officer. The board or council
should also give this person or position authority to issue
special weight permits.
The local authority can impose weight limits on a
highway or bridge that they believe will be damaged
because of roadbed weakness or other special
conditions. Signs must be posted to give notice of
the restrictions, and these signs must conform to the
current ManualTonTUniformTTrafficTControlTDevicesand
the WisconsinTSupplementto that manual. For bridges
there must be an advance warning sign at the nearest
intersection. Limits become enforceable as soon as
signs are in place.
It can be complicated to analyze the capacities of
individual pavements and bridges. Local authorities may
use their judgement and knowledge of existing pavement
conditions or may hire a consultant to conduct engineer-
ing analyses. Limits based on actual testing will stand
up to potential litigation better than those based on
experience alone.
Legal authority for establishing weight limits is found
in Chapters 348 and 349 of the Wisconsin State Statutes.
Chapter 348 establishes restrictions on the size, weight
and loading of vehicles. Section 348.15 establishes
specific truck weight limitations and exemptions.
Sections 348.25, 348.26 and 348.27 outline the
provisions for permits for vehicles of excessive size and
weight. Such permits are generally issued by the state
Department of Transportation for state highways. Local
officials also have authority to issue credentials for their
road systems under Section 348.26(2).
Chapter 349 gives state and local agencies authority
to regulate movement of heavy vehicles. Section 349.15
provides the authority to establish Class B highways on
local roads. Section 349.16 gives the authority for local
officials to impose special or seasonal weight limitations.
Section 349.17 is the authority for cities, villages, and
towns to establish designated truck routes.
Exemptionsrandrenforcementr
State statutes have many provisions permitting overloads
for specific commodities such as milk and logs. As a
result, some people believe that this special treatment
applies to local roads with load restrictions. This is
not the case. In fact, local weight limits override all
special permits in the statutes. Local officials maymake
exceptions, but are not required to.
Once load limits are posted, numerous requests for
exceptions are likely. Local agencies may make excep-
tions, but it is important to be consistent and reasonable.
Overusing exceptions weakens the effectiveness of load
limit programs.
6
Page 11 of 88
PublicTagencyTvehiclesTareTnotTexemptTfromTweight
andTsizeTrestrictions.All statutory restrictions and locally
adopted weight restrictions apply uniformly to public
vehicles as well as private trucks.
To implement your authority to issue exemptions
under Section 349.16(3) it is best to put the exemptions
in writing. For commodities that will be exempted either
seasonally or permanently, make a good faith effort to
publish these rules. If, as a local official, you intend to
exempt some commodities, you can still restrict their
movement by specifying how often each day they may
travel on a road. You may also require that they travel
at specific times during the day, such as before 7:30 am
when overnight temperatures may have temporarily
strengthened the road. Like the basic exemptions, these
restrictions should be in writing and publicized.
Before posting roads, local agencies should plan how
to enforce the limits. Law enforcement officers can order
an apparent violator off the highway and issue citations.
Repeat violators must pay higher amounts, and the
amount to be paid increases with the amount of weight
over the limit.
State Patrol officers and county deputies are author-
ized to enforce weight limits. The State Patrol offers
annual training sessions on enforcing truck sizes and
weights for local law enforcement officials. Scales used
to enforce weight laws must be certified accurate.
Haulers have another considerable incentive to
comply. Under Section 86.02 of the Statutes, a party
which has caused damage to the highway is liable for
triple the cost to repair the damages. These are collected
through civil court.
Speed enforcement is also important because damage
is increased at high speed.
Permitsr
Haulers with loads over the weight and size limitations
can request permits for travel on state trunk highways
from the Wisconsin DOT. Permits can be for a single trip
or multiple trips and are issued at the WisDOT central
office in Madison.
Except for vehicles authorized in the Statutes to have
excess axle weights (Sections 348.15(3) (bg, br, & bv),
trucks which intend to also use local road systems must
obtain permission from the local maintenance authority.
Local agencies should establish permit procedures
and designate a person with authority to issue them.
Assigning this to the same person who establishes weight
limits is reasonable and convenient. However, if a
different person is issuing permits—the town clerk, for
example—it is a good idea to coordinate with the local
authority which establishes the limits. Local permit forms
may be individualized, but many local officials have
found it useful to copy WisDOT forms.
Single trip permits authorize an overweight or over-
sized vehicle to make one trip over a designated route.
The local authority should carefully select roads and
bridges that can adequately handle the excess load.
Determining these permitted routes can be complex
and may require help from an engineering consultant.
When the state puts roads into “thaw status,” it
reduces maximum weights for single trip permits. It also
suspends the authority for moving overweight loads that
are divisible (like garbage, logs, agricultural products),
and declares certain vulnerable state highways as Class II
roadways which limits the maximum weight during
spring thaw to a GVW of 80,000. Class II roadways may
also be temporarily posted for even lower weight limits.
Signingrforrweightrrestrictionsr
Weight restriction signs are regulatory and should be
white with black lettering to conform with the federal
ManualTonTUniformTTrafficTControlTDevicesTdMUTCDe
and the WisconsinTSupplement. Uniform signing
improves coopera-
tion and makes
enforcement easier.
All weight limit
signs must say:
“by order of” the
local agency.
Class B high-
way signs should
be installed at
intersections with
other highways.
Bridge weight restriction signs must follow instructions
from WisDOT. These signs must include the gross
weight and maximum limits for axle loads. Signs should
be posted at the bridge and also far enough in advance
that trucks can detour around the limited structure.
Permanent special weight signs must be permanently
installed and designate the maximum gross weight.
Temporary weight limits such as spring load restrictions
should also be on standard signs that are reflectorized
and that meet the standards of the MUTCD. Hand
painted and faded signs are not appropriate.
7
BY ORDER OF
TOWN OF FAVREVILLE
BY ORDER OF
TOWN OF FAVREVILLE
BY ORDER OF PACKER COUNTY
BY ORDER OF
PACKER COUNTY
Page 12 of 88
BulletinTNo.TwTrevisedTNovemberTommpT©TCopyrightTWisconsinTTransportationTInformationTCenter.T
WisconsinrTransportationrBulletinrisTaTseriesTofTfactTsheetsTprovidingTinformationTtoTlocalTtown,TmunicipalTandTcountyTofficialsTonTstreetTandThighwayTdesign,Tconstruction,T
maintenance,TandTmanagement.TTheseTfactTsheetsTareTproducedTandTdistributedTbyTtheTWisconsinTTransportationTInformationTCenter,TaTprojectTofTtheTUniversityTofTWisconsinj
Madison,TDepartmentTofTEngineeringTProfessionalTDevelopment,TfundedTasTaTLocalTTechnicalTAssistanceTCenterTbyTtheTFederalTHighwayTAdministration,TWisconsinTDepartmentT
ofTTransportation,TandTUWjExtension.TUWjMadisonTprovidesTequalTopportunitiesTinTemploymentTandTprogramming,TincludingTTitleTIXTrequirements.
CopiesTareTavailableTfreeTwhileTsuppliesTlastTfromTtheTTransportationTInformationTCenter,TqpoTNorthTLakeTStreet,TMadison,TWITrpvmu.T
PhoneyTwmm/qqojqunrzTejmailyTtic@epd.engr.wisc.eduzTURLyThttpy//tic.engr.wisc.edu
8
Communication
Effective communication with the public, your own
agency, and affected haulers is essential. Alert the local
media when weight restrictions are imminent. Remind
drivers of public works trucks that weight restrictions
apply to them too. Contact industries which make local
deliveries or supply local services and tell them what the
limits are and when limits will begin.
Consult with local haulers about ways to protect par-
ticularly vulnerable roads. For example, milk haulers
could alter the order of pick up to lessen the weight at a
bad site, or septic pumpers may limit how full their tanks
are when traveling problem roads to service customers.
Large construction projects that require hauling
heavy construction materials need special coordination
in advance. Local officials and contractors should plan
together well before the limits are imposed. They can
agree on specific hauling routes using roads that are
both strong enough and reasonably efficient.
Advance agreements with contractors and other
heavy haulers can be very effective. Informal agreements
or formal contracts assign responsibility to these haulers
for repairing damage along their routes. Some agencies
require bonds or escrow accounts in advance to ensure
compliance. Inspecting haul routes ahead of time is
important in enforcing these agreements. Photographing
or video taping is also helpful in documenting existing
condition. These techniques establish pavement condi-
tions before spring thaw begins.
The alternative to advance agreements—establishing
very restrictive weight limits after bids are in or construc-
tion is underway—can be very disruptive and costly, and
may result in litigation. Both contractors and local agen-
cies are responsible for this advance coordination.
Summary
Protecting local roads from damage by heavy vehicles is
the responsibility of local authorities. WisconsinTStatutes
provide adequate authority to exercise this control. In
establishing weight restrictions, local authorities must
use judgment and common sense to balance the need
for protecting roads with maintaining commerce and an
efficient transportation system. Close coordination with
Wisconsin DOT and adjoining local agencies is essential
to an effective program. Also, set a good example with
your own agency. Be sure that all publicly-owned
equipment observes the weight restrictions.
Resources
GuidelinesrforrSpringrHighwayrUserRestrictions,
Federal Highway Administration, Report No. FHWA-
TS-87-209, Turner-Fairbank Highway Research Center,
6300 Georgetown Pike, McLean, VA 22101-2296. And
related videotapes.
StaterHighwayrMaintenancerManual,rGuideline 30.06,
January 1, 1993, Wisconsin Department of Transpor-
tation, State Maintenance Engineer for Highways,
PO Box 7916, Madison, WI 53707-7916.
HowrVehiclerLoadsrAffectrPavementrPerformance,
Wisconsin Transportation Information Bulletin, No. 2,
Wisconsin Transportation Information Center–LTAP,
432 N. Lake St., Madison, WI 53706.
Other references
StudyrEffectsrofrOff-RoadrEquipmentrTiresronrFlexible
andrGranularrPavements.An Executive Summary of the
South Dakota Department of Transportation describes
damage to test pavements. The report is available for
download at: http://www.state.sd.us/Applications/HR19
ResearchProjects/oneproject_search.asp?projectnbr=
SD1999-15 (The 131 page report is a 4.4 MB pdf file.)
FrostrHeave:rWhatrcausesritrandrhowrwercanrinterfere
withrit,Special Bulletin #19, November 1995. Written
by Dr. Rich Reid, Asst. Prof. of Civil Engineering, South
Dakota State University, for South Dakota Transportation
Technology Transfer Service.
AGuidertorSpringrHighwayrUserRestrictions:rWhenr
torApply,rHowrLongrtorApply,randrWhenrtorRemove.
TheTBridgeTFactTSheet,Spring 1994, Michigan Local
Technical Assistance Program, Houghton, Michigan.
PostingrandrBondingrLocalrRoads:rASolutionrto
DamagesrCausedrbyrHeavyrHaulers,LTAP Technical
Information Sheet #57, January 1994, by Alan L.
Gesford, LTAP Engineer, Pennsylvania Local Roads
Program, Penn State Harrisburg, 777 West Harrisburg
Pike, Middletown, PA 17057-4898.
WalshrCounty’srLoadrLimitrEnforcementrProgram,by
Harvey Melstad, in TheTCenterTLine,TFall 1990, North
Dakota State University.
LegalrOpinionsby Attorney J.R. Habeck, in the news-
letter of the Wisconsin Towns Association.
Page 13 of 88
1
Check, Nathan
From: Wisconsin DOT <admin@pima.wisconsindot.gov>
Sent: Tuesday, January 27, 2026 8:28 AM
Subject: Notice of Public Comment Period - WisDOT Coordination Document
WisDOT Coordination Document
Greetings -
The purpose of this notice is to inform the public and seek comment on the Wisconsin
Department of Transportation's (WisDOT) draft Coordination Document. The
Coordination Document outlines the processes by which WisDOT will coordinate with
various parties during the development of required planning products and other select
programs. It also highlights some of WisDOT's successful practices and reviews the
steps in the local cooperation and consultation processes for select planning and
programing efforts. Per 23 CFR 450.210(b)(1), the Coordination Document must be
updated every five years and was last updated in April 2021. The public comment
period will end on March 29, 2026.
Click here to review the Coordination Document.
Click here to comment through the online comment form.
Comments on the draft document will be accepted through March 29, 2026 and may be
submitted through the online comment form on the plan's website , by email to
bop.dtim@dot.wi.gov, or by mail to the Wisconsin Department of Transportation's
Division of Transportation Investment Management, Bureau of Planning and Economic
Development, 4822 Madison Yards Way, P.O. Box 7913, Madison, WI 53707-7913.
If you would like to unsubscribe please click here .
If you would like to unsubscribe please click here .
Page 14 of 88
Page 15 of 88
Page 16 of 88
THE TRANSPORTATION FUND
DILEMMA…
THE CAMPAIGN STARTS NOW
Page 17 of 88
Outline
• The WCHA efforts on Transportation Impact (a
Strategic Planning Goal)
• The problem
• The plan
Page 18 of 88
Three Objectives Determined
Objective # 1 Objective # 2
WCHA is an expert in the industry and a key
collaborator.
WCHA is a resource for members and
partners.
Objective #3
WCHA will advance and strengthen its
partnerships
FROM THE 2026-2036 WCHA STRATEGIC
PLAN…
Page 19 of 88
FROM THESE OBJECTIVES,
WHAT IS THE GOAL?
RESOURCES
POLITICAL CLOUT
CONTINUED ASSOCIATION LEGITIMACY
Page 20 of 88
HOW ARE YOU LAYING THE GROUNDWORK, FROM YOUR COMMUNITY ,
YOUR COUNTY?
• Regular WCHA Conference/Training/Event Theme:
• Positioning yourself as a “go to” for Transportation
• You already are for your County Board
• Let’s shoot to be “that resource” for your State Legislator!
• Continuing Opportunities
• Invite Legislators to your Facility
• Ribbon Cuttings, Facility Tours, Ride Alongs
• Work with your WCHA District
• Participate in Fall/Spring District Gatherings (Invite
Legislators/Congresspeople to them)
• Utilize Opportunities presented by WCHA and their partners
• Visits to State Capitol/Testimony at Budget
Hearings/Legislative Hearings
• Utilize Opportunities provided by Elected Officials
• Attend Town Halls/Office Hours/In-District events
Page 21 of 88
IT’S CRUNCH TIME!!!!
➢Any Previous Groundwork laid with your
local legislator will prove helpful when
issues arise
➢AND WE HAVE AN ISSUE…
Page 22 of 88
Significant Investment In Current Biennium
6.82 6.80 7.20 7.06
8.35 8.90
0
1
2
3
4
5
6
7
8
9
10
2015-17 2017-19 2019-21 2021-23 2023-25 2025-27
IN BILLIONS $
Source:
WisDOT
Page 23 of 88
Projects & Programs Moving Forward
LRIP-S ARIP Interstate Projects
Page 24 of 88
The Source of the Funding Matters
0
1
2
3
4
5
6
7
8
9
10
2015-17 2017-19 2019-21 2021-23 2023-25 2025-27
Bonding
General Purpose Revenue
Federal
State
$8.35 $8.90
$7.06$7.20$6.80
IN BILLIONS
$6.82
Page 25 of 88
Transportation Funding Issue in One Slide
$18,537
$21,095 $21,178
$3,043 $2,380 $2,081
$0
$5,000
$10,000
$15,000
$20,000
$25,000
2006 2019 2024
General Fund Taxes State Transportation User Fees
-32%
14%
• General Fund tax collections
in 2024 dollars (CPI) increased
14%, despite tax cuts, with
growing incomes, prices, and
consumer spending buoying
the fund.
• Transportation user fee
revenue (in 2024 $s, WCCI)
decreased 32% despite some
fee increases.
IN MILLIONS
Transportation User Fees Don’t Grow like General Fund Taxes
Page 26 of 88
$1+ Billion 2027-29 Challenge
Replace the one-
time GPR funding
1
Provide resources
for generational
projects in the
hopper
2
Maintain program
purchasing power
3
Page 27 of 88
Advocacy Is a Team Sport
Page 28 of 88
The Campaign: What People Say
Page 29 of 88
Roads & Bridges Top Tier Budget Priority
Q. Which of the following areas are important for the State of Wisconsin to direct funding
towards? Select all that apply.
Page 30 of 88
Roads & Bridges Least Polarized Area
Q. Which of the following areas are important for the State of Wisconsin to direct funding
towards? Select all that apply.
Page 31 of 88
Wisconsinites Dissatified with Conditions
Q. How satisfied are you with the condition of the roads and bridges you drive on most
frequently in Wisconsin?
Page 32 of 88
Over 50% Say Spending on Roads & Bridges is
Too Low
Q. Do you think the state spends too much, not enough, or about the right amount on
road and bridge construction and maintenance in Wisconsin?
Page 33 of 88
Road & Bridges Not THE Most Important
Q. Which of the following areas is the most important for the State of Wisconsin to direct
funding towards?
Page 34 of 88
Moving People to Action
What I know I
should do. Doing it.
Page 35 of 88
The Campaign: The Overview
Page 36 of 88
2025 and 2026: Creating the Drumbeat
Page 37 of 88
Transportation
Delivers
• Jobs
• Connections
• Economic
Opportunity
• Safety
Page 38 of 88
Strategic Investment Drives Economic Opportunity
Case Study: Business Booms Along Improved I-94 N-S
$2 billion investment = $11
billion (108%) increase in
assessed property values along
the corridor since 2015,
compared to 30% in the rest of
Milwaukee, Kenosha, and
Racine counties.
Source: Analysis of assessed property values within three miles of the modernized corridor versus the rest of properties within the counties.
Page 39 of 88
The Stories are Unlimited – We still need your stories
Page 40 of 88
Upgrades Result in Significant Crash
Reductions
Zoo Interchange 29%
Marquette Interchange 48%
I-94 N-S 34%
I-39/90 27%
Page 41 of 88
Transportation
investment – at every
level – delivers.
Page 42 of 88
The Campaign: The Grassroots
Page 43 of 88
Working with Partners, Growing the Tent
• Ag groups
• Timber
• Towns
• Counties
• Motor Carriers
• Businesses
• Chambers of Commerce
• Economic Development Orgs
• Local Governments, Mayors
• Law Enforcement & Other Safety
Advocates
• Businesses
• Chambers of Commerce
• Economic Development Orgs
• Local Governments, Mayors
• Law Enforcement & Other Safety
Advocates
• Labor
BRIDGES
COMMUNITY
HIGHWAYS
LARGE PROJECTS
Page 44 of 88
First Inventory for Small Bridges Finds Aging
Structures
2023-25 budget included $12.5
million to inventory and assess
structures between 6'-20’.
Just under 17k structures
identified.
Inspections wrapped up.
The project served as a way to
realize the depth and breath of a
problem key to our transportation
vitality.
Page 45 of 88
A New Way to Talk About Needs
Nearly 17,000 Structures Inventoried
1,600+ Poor/Severe Structures
Page 46 of 88
Value of Local Examples
• Makes the talking points
or the issue come to life
• Invests lawmakers in
solutions for their
districts
• More memorable than
statistics
Page 47 of 88
The Campaign: The Ask of You
Page 48 of 88
1. Establish or maintain relationships with your legislators
2. Respond to requests for information and case studies
3. Show up at industry events
4. Assist with the local resolution effort
Four Things That You Can Do
Page 49 of 88
The Campaign hinges on education and full
understanding of what’s at stake
•Local Officials – knowing, seeing understanding the “boots on
the ground” needs for their communities, must send a message
to lawmakers that action is vital.
•Counties, Towns, Cities and Villages – by sending local
resolutions imploring the legislature to address the
Transportation Fund question, will apply the necessary wake up
call in Madison.
The Local Resolution Effort
Page 50 of 88
The Local Resolution Effort
Counties will be asked to approve Resolutions within their individual Boards.
As County Highway Commissioners, your effort to inform, educate and
advocate for the passage of the Resolutions will be needed.
The model Resolutions will be managed through the Wisconsin Counties
Association (WCA).
Timeline: Looking at a March/April timeframe for approvals
To See the Resolutions: Messages from WCHA’s “Friday Update”, WCA communications - websites
Page 51 of 88
QUESTIONS?
Page 52 of 88
DEBBY JACKSON,
EXECUTIVE DIRECTOR
COLLI N DRI S COLL ,
GOV ER N MEN T A F FA I RS A S S OC I ATE
Page 53 of 88
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715-345-5356
Date: February 11, 2026
To: Highway Committee
From: Nathan Check, P.E.
Subject: Commissioner’s Report
Please see below for a number of Highway Department Updates.
Staffing – We have an accepted offer for the open laborer position from last year and the
applicant is going through the required pre-employment testing. The seasonal positions are also
being advertised with the one civil technician, 5 seasonal laborers, and 6 summer help positions.
Training – The WCHA Winter Conference held in Lacrosse was well-attended at the new
location. Highway staff also participated in our winter kick-off training, chainsaw, confined
space awareness, sign truck, and fork lift training.
The Commissioner and Finance Director have been asked to present with other counties at the
Wisconsin Government Finance Officers Association Annual Conference in Oshkosh in April
regarding government funding strategies and the vehicle registration fee.
Operations – Crews are in full winter maintenance mode. As of 2/11, the crews have responded
to 50 winter weather events compared to 35 at this time last year. State crews have been busy
with guardrail and cable guard repairs. We also had our first electric car fire which brought new
challenges to deal with, but Plover Fire Department had the situation under control. For County
crews, the excavators have been brushing outside of any winter events and tree removal crews
will be focusing on the CTH D construction project.
Year-end Budget – Below is the 2025 budget analysis through year-end.
Winter maintenance was tracking within budget but ended up approximately 15% over due to the
winter events in December.
General maintenance ended at 98% of the budget.
Overall Special Revenue expenses were at 92% of the budget while revenues were at 98% of
budget which resulted in nearly $678k in savings that are designated for future use.
The Machinery Operation budget ended the year with a significant surplus.
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Page 54 of 88
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715-345-5356
Below is a summary of the net surplus/loss through the year.
January + $15k July +$347k
February +$261k August +$393k
March +$231k September +$437k
April +$280k October +$454k
May +$219k November +$356k
June +$241k Year-end +$699k
In addition to the machinery operations surplus, there was an additional $106k of gain from
reconciling our cost pool administration/supervision/radio accounts leading to a net gain of over
$806k in 2025.
The DOT Routine Maintenance Agreement ended at 138% of the budget with the majority of the
overage due to February and December winter charges. The remainder of the months were
within 5% of the budget.
2026 Budget - Costs were ran through January 17
th but will be updated at the next meeting when
we have more data.
Projects
-CTH B Project – The Village is invoiced and has paid for their portion of the project. Staff is
waiting on the final WisDOT close-out. Staff has reviewed the concrete joint repair areas from
last year which are holding up well to the winter plowing.
-Safe Streets for All(SS4A) Grant – Draft plans of the Bike/Ped Plan and ADA Compliance Plan
have been submitted to the Committee for their review and comments. Additional information
can be found at: https://www.co.portage.wi.gov/735/Safe-Streets-Roads-For-All-Grant
-WisDOT Structure 6’-20’ Program – WisDOT has released the applications and requirements
for the Local Small Structure Improvement Program (LSSIP). This program sets aside $30
million to reimburse local governments to improve deteriorating small structure crossings also
referred to as culverts. Culverts are defined as structures that are 20 feet or less in span but
greater than 6 feet in span. Projects will be funded at up to 90% state cost share. The culvert(s)
involved in the project must have a condition rating of 4 (poor) or lower as determined by a
certified bridge inspector.
Based on WisDOT’s presentations regarding the program, the $30M will likely not cover all of
the replacement costs for the severe structures(rated 0 to 2). Portage County will be applying for
the replacement of the CTH E structure over the Wisconsin River which is rated at 3. The
Page 55 of 88
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
County has one structure rated a 3 and then four more rated as a 4. For the towns, city, and
villages, there are seven structures rated as a 3 and twenty-five rated as a 4.
-CTH R(STH 54 to CTH B) –An operational planning me eting was held with the designer,
County, Village, and WisDOT to review the 30% plans. The public involvement meeting is
tentatively scheduled to be held during the week of March 9 th . Construction is scheduled for
2028 for this project as part of the WisDOT STP-Urban Program.
-CTH II Bear Creek Bridge – No new updates. Design continues. Construction is set for 2027
for this project with is part of the WisDOT STP-Bridge Program.
-CTH HH and Hoover Development – The site plan and condition use approval for the
development was approved by the City Planning Commission and will be on the Common
Council agenda for February 16th . Chair Ladick and the Commissioner have discussed the
previous Committee action of posting indefinitely with Corporation Counsel who will help
determine next County approval steps if it is approved by the Common Council. I have also
reached out to the City staff regarding a potential jurisdictional transfer of a portion of CTH HH
to the City.
-Operation Ordinance Meeting – No new updates.
-Highway Addition and Renovation – No updates. The project is still waiting final close-out and
payment to Miron as there are some HVAC issues still unresolved.
-WCHA Updates – The WCHA Executive Committee, Board of Directors, and sub-committees
are working on a number of issues including the rewrite of Trans 206(Local Road Improvement
Program), WisDOT Level of Service Model(funding analysis for the Routine Maintenance
Agreements), Bridge program funding model, and Machinery Management salvage value and
depreciation schedules.
-WisDOT Surface Transportation Program 2026-2031 Cycle –Staff has applied for STP-Rural
funding for CTH A(STH 161 to CTH Z) roadway and Local Bridge funding CTH O bridge
rehabilitation. WisDOT is expecting project selection to be announced this Spring.
-Local Road Improvement Program(LRIP) – All applica tions were submitted to WisDOT by the
application deadline and awards are anticipated in Spring. More info on the program can be
found at: https://wisconsindot.gov/Pages/doing-bus/local-gov/astnce-pgms/highway/lrip.aspx
Page 56 of 88
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
-WisDOT STH 54(Harding Ave to Waupaca County) Project – No new updates. Our design
consultant for CTH R will be contacting the WisDOT staff as there may be an overlap of the two
projects and STH 54 is needed for the CTH R detour.
-CTH HH(Old USH 10) Boat Landing – The Resource Man ager for Consolidated Water Power
Company has reached out to begin updating the maintenance agreement which may include a
longer time commitment. Staff will be working with Corporation Counsel on any changes and
will bring them to the Committee for future consideration
New Updates
2025 Inventory – The year-end inventory counts were completed wit hin one day and we were
within 0.2% of the $1M+ inventory at Highway. All staff should be recognized for their efforts
but the efficiency and accuracy can be attributed to our Parts Room and Shop Manager as well as
the Parts Room Assistant.
-New Paver – The new paver has been delivered and Fabick CAT will be providing onsite
training later this Spring. The old paver is being listed with Purple Wave auction.
-Strategic Planning – Staff will be providing input on some of the key areas identified which
include continuing to maintain investment in county property, asset analysis to provide needed,
flexible county facilities, and transportation availability for County residents.
-Town of Hull – CTH X interchange/N 2
nd Street – I have been contacted by the Town of Hull
Chairman to discuss the prior requests for WisDOT to consider an interchange at I39 and CTH
X. Information from the prior 2021 request was provided and I will likely be attending a future
town meeting to discuss their options.
-CTH D(CTH A to STH 54) Project Updates – The public involvement meeting was held on
January 28
th . Staff is currently working with design consultant to finalize the design which
includes the large box culvert options between CTH TT and Patterson Lake Road. Additional
right-of-way(r/w) may be required but multiple options are being evaluated. Options being
considered include:
1. Maintain existing box culvert and roadway profile and protect existing steep slopes
with guardrail. No new r/w is required and box culvert can remain.
2. Replace box culvert with a longer structure, eliminate the guardrail, and maintain the
existing profile. New r/w would be required on the south side of the road. This would
also require a whole new culvert structure.
3. Replace box culvert with a longer culvert, eliminate the guardrail, and just profile to a
45 mph speed which requires raising it approximately 6’. New r/w would be required on
Page 57 of 88
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
both north and south sides of the road. This would also require a whole new culvert
structure.
4. Staff is also evaluating other profile change options with the designer to increase sight
distance which may require less r/w.
-CTH R: Worzalla vs. Check et al Claim – The judge has issued an order granting dismissal
with prejudice on Worzalla’s claim against the County and contractors for the CTH R project
from Black Oak to Porter. The Plaintiff still has an ability to appeal but this is positive news.
-Report on Purchase <$25k 2026 -Equipment Purchase – Ironworker – The purchase of an
ironworker for our shop was included in the 2026 equipment budget. Pricing was obtained for 6
different units with a Uni-Hydro unit from Naab Sales, Minnesota as the best option at a price of
$15,000. This was the budgeted amount.
-Next Meeting Date – Our typical meeting date would be Tuesday, March 17
th at 3:30 pm. I
will be unavailable for that meeting and Chair Ladick will be out of town as well. We can
discuss at the meeting if we will have a quorum for that day or if we need to look at other
dates/times.
If you have any questions on any of the items, please feel free to call or email.
Thank you.
Attachments: None
Page 58 of 88
PORTAGE COUNTY
MEETING MINUTES
HIGHWAY COMMITTEE
PORTAGE COUNTY ANNEX
CONFERENCE ROOMS 1 & 2
1462 STRONGS AVENUE
STEVENS POINT, WI 54481
Tuesday, December 16, 2025 3:30 PM
REMOTE ATTENDANCE & COMMENT
To attend this meeting by telephone : dial 1-872-242-7813, after dialing the number you will then be asked to enter in a
meeting number. Use the following meeting number: 419 488 707, then press #
To attend this meeting by video: Join the meeting now
Page 1 of 2
CALL TO ORDER
The Highway Committee was called to order by Chair D. Ladick at 3:30 p.m.
Members Present: Chair D. Ladick, Vice Chair S. Cieslewicz, Member M. Jacowski, Member S. Potocki, Member A. Schwartz
Others Attending: Nathan Check, Stacy Zerby, Corey Giese, Lucas Meddaugh (Remote)
CORRESPONDENCE
1. WisDOT Email Regarding STH 54 (Harding Ave to Waupaca County Line) project
Update Only
2. WisDOT Calendar Year 2026 General Transportation Aid Calculation
Update Only
PRESENTATIONS
3. Precise AVL/GPS Equipment
Update Only
REPORTS
4. Special Meeting Attendance Reports (Portage County Ordinance 3.1.47 & 3.1.48)
5. Commissioner's Report
Update Only
PUBLIC NOTICE
Members of the public who wish to address the Committee on specific agenda items must register their request at this time,
with such comments subject to the public comment ordinance and the reasonable control of the Committee Chair as set
forth in Robert’s Rules of Order.
APPROVAL OF MINUTES
6. Approval of November 18, 2025 Minutes
A motion was made by Member M. Jacowski, seconded by Vice Chair S. Cieslewicz to approve the minutes. Motion carried by
unanimous vote.
DISCUSSION/POSSIBLE ACTION
7. Discussion and Possible Action on 2026 WisDOT Traffic Maintenance Agreement - Signing
Page 59 of 88
Highway Committee Meeting Minutes December 16, 2025
Page 2 of 2
A motion was made by Vice Chair S. Cieslewicz, seconded by Member A. Schwartz to approve the 2026 WisDOT Traffic Maintenance
Agreement — Signing for $45,000. Motion carried by unanimous vote.
8. Discussion and Possible Action on 2026 WisDOT Traffic Maintenance Agreement - Pavement Marking
A motion was made by Member S. Potocki, seconded by Member M. Jacowski to approve the 2026 WisDOT Traffic Maintenance
Agreement - Pavement Marking for $440,000. Motion carried by unanimous vote.
9. Discussion and Possible Action Re: Reconsider Previous Committee Action on Resolution Revising and Updating
County Ordinance 2.13.1, Establishment of Speed Zones
A motion was made by Member M. Jacowski, seconded by Vice Chair S. Cieslewicz to reconsider the speed ordinance update for #58
CTH KK. Motion carried by unanimous vote.
A motion was made by Member M. Jacowski, seconded by Vice Chair S. Cieslewicz that during reconsideration, to leave #58 CTH KK
as is currently written in the ordinance. Motion carried by unanimous vote.
10. Discussion and Possible Action on 2026-2027 Proposed Highway Right-of-way Maintenance Plan
A motion was made by Member M. Jacowski, seconded by Vice Chair S. Cieslewicz to approve the 2026-2027 Proposed Highway
Right-of-Way Maintenance Plan. Motion carried by unanimous vote.
NEXT MEETING DATE
Tuesday, January 20, 2026 - 3:30 p.m.
ADJOURNMENT
Adjourned 4:15 p.m.
Page 60 of 88
Page 61 of 88
Page 62 of 88
Page 63 of 88
Page 64 of 88
Page 65 of 88
Page 66 of 88
Page 67 of 88
Page 68 of 88
Page 69 of 88
Page 70 of 88
Page 71 of 88
Page 72 of 88
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
Date: February 11, 2026
To: Highway Committee
From: Nathan Check, P.E.
Subject: Discussion and Possible Action on 2027 Equipment Purchase – Truck Chassis
Background:
Three truck chassis are proposed in the 2027 Equipment Replacement Plan. These chassis are
typically ordered in the year prior in order to be ready for the next plow season. In addition,
upcoming EPA
"Phase 3" regulations for model years 2027–2032 wil l significantly tighten
emission standards and are expected to raise prices for those model years.
Analysis:
Highway staff has worked with the Purchasing Department on prior purchases through bidding
and cooperative purchasing agreements. For this purchase, the most advantageous option is
Quality Truck Center through the Sourcewell cooperative purchasing agreement. Their direct
buy pricing is summarized below. This includes all costs and extended warranties.
(2) Patrol Truck Chassis, Western Star 4700X tande m axle $164,715/chassis
(1) Quad Axle Truck Chassis, Western Star $186, 673/chassis
For reference, last year’s price was $164,488/ patrol truck chassis and the 2025 pricing for the
quad axle chassis was $173,048 with the increase largely due to tariffs. These purchases include
a 7 year, 150,00 mile warranty on the chassis, engine, exhaust after treatment and engine sensors
and harnesses.
Fiscal Impact:
The three chassis will be included in next year’s M achinery budget but it is prudent to lock these
prices in now so that they may be delivered in time for the 2027 winter season.
Recommendation:
Staff recommends that the Committee approve the purchase of 3 truck chassis’ to Quality Truck
Center for the 2027 replacement trucks. The Purchasing Director has reviewed and approved
the purchases.
Attachments: None
Page 73 of 88
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715-345-5356
Date: February 11, 2026
To: Highway Committee
From: Nathan Check, P.E.
Subject: Discussion and Possible Action on 2027-2031 Highway Capital Improvement Plan
Background:
C
apital Improvement Project Request forms were due to the Finance Department for the 2027-
2031 Plan.
Highway Department staff has been updating the Department’s Reconstruction, Reconditioning,
Resurfacing program as part of our Capital Improvement Plan(CIP). The Highway CIP has been
separated out from the full County CIP due to separate revenue sources. Significant Committee
discussion regarding the Highway CIP funding levels and level of service has continued since
2016 with various goals set by the Committee. The Highway CIP had been developed over the
past few years with those goals which were to maintain an approximate budget of $3M/year and
resurface 10 miles per year. Since that time, construction inflation has increased significantly and
the annual budget target has been increased to approximately $4M.
The Capital Project Request Form was due to Finance in February and is attached as well.
Analysis:
Multiple Requests were submitted for this upcoming cycle which include:
1. Highway Infrastructure Projects - Staff has developed a draft 5 Year Plan which will
primarily address our pavement and structure needs. We will also be continuing to
develop short and long-term maintenance plans so that the Department’s entire operations
can be considered when it comes down to budget decisions. The CIP also includes design
costs for any major reconstruction or bridge replacement projects. The draft 5 year plan is
attached and breaks down the improvements into 3 main categories:
1. Reconstruction – These projects typically require the complete rebuild of the road base
and significant improvements to the right-of-way including grading and drainage
improvements. These projects include any major bridge replacements.
2. Reconditioning – These projects typically require minor improvements to the road base
and will include spot ditching and drainage improvements. Spot improvements such as
vertical or horizontal hill realignments may also occur.
3. Resurfacing – These projects are the typical pavement replacements consisting of
pulverizing and paving a new surface. Very minimal work is needed outside the shoulder
points. This may also include milling off the surface and paving a new surface. While
not a full pavement replacement, it will extend the life of the roadway at least 10 to 15
years.
The goal of this plan is multi-fold:
A. Decrease the life cycle of our pavements: The plan averages approximately 10.7
Page 74 of 88
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715-345-5356
miles/year of new pavement which results in an average pavement replacement of 40.5
years. An average of 30 to 35 years would be preferred but this would require
significant more funding. As you refer to the attached CIP, the assumed mileage does not
include 4.5 miles for the proposed CTH A STH project in 2030. This mileage was
excluded as the staff is unsure of the likelihood of the grant funding as we would have
three Surface Transportation Program projects within 5 years. If this project was
included, it would increase our average to 11.6 miles/year and a 37.4 year pavement
cycle.
B. Address Safety and Existing Deficiencies: The plan does not consist of any major
reconstruction projects but does include multiple recondition projects every year which
will allow the department to correct issues such as poor drainage and steep sideslopes
with spot base and subgrade strengthening areas. Spending the additional
dollars upfront in correcting these issue versus a resurfacing project will help extend
the life of these pavements and improve safety. The scope of many of the projects
have been reduced to only address the major issues as full corridor reconstruction can
double the cost of the project.
C. Attempt to balance workload: Since the Department’s Enterprise Fund and equipment
replacement is not directly supported by levy or other outside funding, it is critical
that we have a balanced program which will allow us to optimize our fleet to ensure
we are providing efficient services to our taxpayers. A balanced and sustainable
program is also critical in analyzing our staffing needs. The plan also balances the
time in between major design and construction projects to allow for enough time for
real estate acquisition and utility relocations, if needed.
D. Balance construction with maintenance: Large fluctuations in the pavement program
and funding has resulted in significant shifts in personnel and resources from
maintenance activities. Staff continues to work on this issue and believes that
maintenance and construction needs can be balanced with sustainable and consistent
funding.
E. Include bridge/drainage structures: The County owns 38 structures classified as
bridges with spans greater than 20 feet. There are also a number of larger drainage
structures between 4 feet to 20 feet which are in the process of being inventoried.
The structures represent a significant amount of capital investment which need to be
included in the CIP. This plan includes replacing 4 of those structures over the next 5
years.
F. Seek outside funding opportunities: As mentioned previously, in order to average 10
miles per year, the plan relies on other funding sources. The Highway Department has
been awarded two large projects as part of this current CIP. This includes WisDOT
Surface Transportation(STP) Rural funding for CTH A from CTH Z to STH 66 and STP
Urban funding for CTH R from STH 54 to CTH B. It will include future applications for
Page 75 of 88
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715-345-5356
the other CTH A projects as well as potential structure funding for structures under 20’ in
length. As other funding opportunities arise, staff will evaluate the program for
any options.
2. Highway Department Facility Paving – This project includes replacing the eastern
p
ortion of the facility which was paved over 40 years ago.
3. Salt Shed and Brine Room Expansion – This project includes the construction of a new
salt/sand shed as well as expansion and utility upgrades to the current brine room.
4. Existing Salt Shed Repairs – This project will include the replacement of the existing
shingled roof on County Salt Shed #2. The project will also include installing steel on
the end walls of Salt Sheds #1 and 2 while also washing and treating the timber side
walls.
Fiscal Note:
The Highway CIP ranges between $3.4M to $5.2M from 2026 to 2031 with an average cost of
$4.5M.
While the goal was set at $3M/year over8 years ago, inflation has had an impact on these
projects with higher material, labor, and equipment costs. If the Committee wishes to retain the
$3M/year, a new CIP will be drafted with scope changes for roads to reduce the costs. It is likely
that multiple reconditioning projects would be eliminated and replaced with more resurfacing
projects which would only address the pavement section and nothing outside of the shoulder
points.
While tax levy has helped provide some funding for the Highway CIP, the plan has been
primarily funded by borrowing and the vehicle registration fee. The fiscal plan is to borrow on an
every-other-year basis and utilize two year’s of vehicle registration fees to pay for the alternate
years. The County Board approved an increase to the vehicle registration fee which is expected
to generate approximately $1.7M/year.
The remaining projects would be funded through the Higwhay Enterprise fund as they are
building and facility improvements.
Recommendation:
As the Committee has seen over the years, this is a planning tool which can be modified year to
year depending on budget and system needs. Staff recommends that the Committee review,
discuss, and provide staff direction for any funding or level of service changes.
Due to funding constraints, a majority of the proposed CIP projects are not proposed for roadway
widening. Recent projects such as CTH Z and CTH K included widening the existing base from
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Page 76 of 88
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715-345-5356
28’ total to 32’ which allows for a 11’ travel lane, 3’ paved shoulder, and 2’ gravel shoulder.
This required real estate as well as grading along the entire corridor which can increase the per
mile cost another 50 to 100% in some cases. While the widening does have increased costs, it
will provide for a safer road with reduced shoulder drop off areas and reduced shoulder
maintenance in the long run. The majority of the projects propose widening the pavement widths
from 22’ to 24’ but maintains the existing 28’ existing total width.
As part of the CIP process, staff recommends that the Committee review the proposed widths as
well as the scoping of the projects as that will have a significant impact on the project costs.
Attachments: Draft Highway Capital Improvement Plan - Roadway and Bridges
Capital Project Funding Request Forms
Page 77 of 88
Portage County 2027- 2031
Highway Capital Improvement Plan - Roadway and Bridges
2/11/26 Update
Road Limits Length (miles) Estimated $/mile Estimated Cost Comments
CTH T CTH B to CTH SS 2.43 450,000.00$ 1,093,500.00$ Reconditioning. 1989-91. Limited ditching.
CTH T CTH SS to STH 161 0.96 450,000.00$ 432,000.00$ Reconditioning 1989. Limited ditching.
CTH T STH 161 to CTH MM 2.50 450,000.00$ 1,125,000.00$ Reconditioning 1990. Limited ditching. $285k LRIP grant
CTH E CTH HH to Dam Road 5.98 285,000.00$ 1,704,300.00$ Resurfacing, Mill and Overlay. 1969-1970
Design Funds for CTH O Bridge Deck overlay 20,000.00$ Bridge Rehab Project Potential STP Bridge Funds, total estimated at $750k
Design Funds CTH T(CTH MM to CTH A) 186,000.00$
Total Length = 11.87 TOTAL 2027= 4,560,800.00$
Road Limits Length (miles) Estimated $/mile Estimated Cost Comments
CTH T CTH MM to CTH A 6.24 750,000.00$ 4,680,000.00$ Reconditioning. 1976-78. 2027 Design
-$
Design Funds CTH K, CTH A STP project 275,000.00$
CTH X <20ft. Structure on Trib. Of Little Eau Claire R. n/a -$ 275,000.00$ Large culvert replacement. Review possiible <20' funding options. 2026 Design
CTH R STH 54 to CTH B 2.05 -$ -$ Awarded STP U Funds. Village of Plover Responsibility per MOU/JTA. ($3.3M total)
Total Length = 8.29 TOTAL 8= 5,230,000.00$ Total with
2029
Road Limits Length (miles) Estimated $/mile Estimated Cost Comments
CTH GG CTH EE to CTH A 3.05 375,000.00$ 1,143,750.00$ Resurfacing, 1987
CTH K CTH B to USH 10 3.64 375,000.00$ 1,365,000.00$ Resurfacing, 1994. $260k LRIP grant
CTH TT STH 54 to CTH K 1.25 350,000.00$ 437,500.00$ Resurfacing, 1981
CTH A CTH Z to STH 66 4.25 260,000.00$ 1,105,000.00$ Awarded STP -R Funds, County Share is 20%, total construction estimated at $5.4M
CTH A Structure over Flume Creek Bridge Replacement included in CTH A project
CTH O B49-063 Bridge Deck Overlay 150,000.00$ Bridge Rehab Project Potential STP Bridge Funds, total estimated at $750k
Design Funds for CTH A Spring Creek bridge 55,000.00$
Total Length = 12.19 TOTAL 2029= 4,256,250.00$
Road Limits Length (miles) Estimated $/mile Estimated Cost Comments
CTH W CTH BB to CTH J 1.07 275,000.00$ 294,250.00$ Overlay, 1980
CTH A CTH J to CTH EE 3.03 450,000.00$ 1,363,500.00$ Resurfacing, minor ditching culverts, 1969-2007
CTH O Wood Cty Line to CTH P 5.50 200,000.00$ 1,100,000.00$ Overlay, 2004
CTH HH Hoover to I-39 SB off ramp 0.37 575,000.00$ 212,750.00$ Resurfacing
CTH A STH 161 to CTH Z -$ 4.5 miles. Potential STP -R Funds, County Share is 20%, total construction estimated at $5.4M
CTH A Spring Creek Structure 450,000.00$
Total Length = 9.97 TOTAL 2030= 3,420,500.00$ miles do not include CTH A STP project. 2029 design
CTH Q CTH A to CTH D 2.93 505,000.00$ 1,479,650.00$ Reconditioning, 1969-1976
CTH J Old Hwy 18 - CTH B 4.03 450,000.00$ 1,813,500.00$ Resurfacing
CTH J CTH B to STH 54 4.25 450,000.00$ 1,912,500.00$ Resurfacing
Future CIP Road Design 50,000.00$
Total Length = 11.21 TOAL 2031= 5,205,650.00$
10.71 Ave Miles/Year 4,534,640.00$ Total Ave Cost/Year (non-STP funds)
Highlighted Projects-potential grant/STP projects 4 bridge/drainage structures replaced/rehabilitated in 5 years.
2030
2028
2027
2031
Page 78 of 88
County of Portage
Finance Department
Capital Project
Funding Request Form
Policy #: TBD
Effective: November 18, 2025
Project # Project Title Existing Salt Shed Repairs
Department Highway Manager Nathan Check
Phase
Budget Action Date 1/27/26
Project Scope & Description
This project will include the replacement of the existing shingled roof on County Salt Shed #2. The project will also include installing
steel on the end walls of Salt Sheds #1 and 2 while also washing and treating the timber side walls.
Cost Summary
Source of Funds 2026 &
Prior Years FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Project
Total
Debt Financing
Grants/Aids
Other(Hwy Enterprise) 200,000 200,000
Tax Levy
Total 200,000 200,000
Cost Documentation 2026 &
Prior Years FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Project
Total
Design & Engineering
Site Preparation
Land Acquisition
Land Improvements 200,000 200,000
Contingency
Financing Costs
Total 200,000 200,000
Operating Impact
Analysis of Need
Shed #2’s roof is past its life expectancy(over 35 years old) and has been experiencing shingle lose over the past 3 years.
This roof protects over 5,000 tons of salt valued over $500,000.
The project will also protect the wood endwalls with steel which were repaired and replaced over the past 5 years in order
to extend the life of the structure. It will also include the washing and sealing of the existing sidewalls to extend the life
of the structure. While the washing and sealing are more of a maintenance project, it would likely be performed by the
same contractor as the other projects and is included in the CIP.
Page 79 of 88
Page 2 of 2
CIP Form 1 (11/18/2025)
Ongoing Operational Costs & Alternatives
The projects are meant to extend the life of a valuable asset which also protects a valuable resource which is our rock
salt.
The do nothing alternative for the roof, end walls, and sidewalls would lead to leaks and affect our salt supply.
A steel roof versus asphalt shingle roof will be evaluated for cost-benefit analysis.
For the end walls, these can remain as-is but then must be repainted every 5 to 7 years at a cost of $10,000/time/shed.
The steel is expected to costs $70,000 for both sheds and will last the expected remaining life of the shed which is at
least 25 years. The steel option is expected to save at least $30,000 over the life of the shed.
Sustainability, Maintenance, and Replacement
The project is meant to prolong the life of the valuable asset versus a full replacement or expensive emergency repairs.
Citizen & Community Impact
The salt stored in this shed is used every winter storm event which impacts the traveling public’s safety throughout
Portage County on county and state roads. The project will also help protect the environment, particularly the
groundwater aquifer by reducing any salt leachate into the groundwater.
County Departments such as Facilities and Parks as well as Towns and Villages also purchase salt from the Highway
Department which provides benefits at the local municipality level as well.
Location & Map
Highway Department – 800 Plover Road, Plover, WI 54467
Previous Actions
2027-2031 – New Project
Page 80 of 88
County of Portage
Finance Department
Capital Project
Funding Request Form
Policy #: TBD
Effective: November 18, 2025
Project # Project Title Highway Department Facility Paving
Department Highway Manager Nathan Check
Phase
Budget Action Date 1/28/26
Project Scope & Description
This project includes the repaving of the eastern portion of the Highway facility which was last paved over 40 years ago. The
western portion of the facility was paved in 2019 as part of the Highway Facility expansion project.
Cost Summary
Source of Funds 2026 &
Prior Years FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Project
Total
Debt Financing
Grants/Aids
Other:(Hwy Enterprise) 225,000 225,000
Tax Levy
Total 225,000 225,000
Cost Documentation 2026 &
Prior Years FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Project
Total
Design & Engineering
Site Preparation 35,000 35,000
Land Acquisition
Land Improvements 190,000 190,000
Contingency
Financing Costs
Total 225,000 225,000
Operating Impact
Analysis of Need
The existing asphalt pavement will be reaching the end of its service life since it was first paved ov er 40 years ago.
Distresses such as widespread cracking and pavement failure are becoming evident.
Ongoing Operational Costs & Alternatives
Once repaved, the paved area will be crackfilled on regular basis to seal the cracks and reduce water infiltration to the
base. It will be chipsealed on a 8-10 year cycle to maximize the life cycle of the pavement.
Page 81 of 88
Page 2 of 2
CIP Form 1 (11/18/2025)
For alternatives, an asphalt overlay is no feasible due to the surrounding building elevations. The do nothing alternative
will lead to further deterioration and constant maintenance costs is pothole filling or patch repairs which will be more
expensive in the long-term.
Sustainability, Maintenance, and Replacement
The area will follow typical asphalt maintenance and preservation schedules for crackfilling and sealing to ensure the life
is extended on the capital investment. The Highway Department is able to perform most of this work in-house to ensure
that it is done in a timely manner.
Citizen & Community Impact
The proposed work is to renew a County asset that services our Highway Facility which is used by all Highway equipment
which services the public traveling on our state and county roadway system. The area is also utilized by the Solid Waste
Department for certain events such as their electronic recycling days. This area also services the Sheriff’s impound
building.
Location & Map
Highway Department – 800 Plover Road, Plover, WI 54467
Previous Actions
2027-2031 – New Project
Page 82 of 88
County of Portage
Finance Department
Capital Project
Funding Request Form
Policy #: TBD
Effective: November 18, 2025
Project # 310-99-01 Project Title Road Improvement Projects
Department Highway Manager Nathan Check
Phase Construction
Budget Action In Progress Date June 9, 2025
Project Scope & Description
This project includes the Highway Department’s Reconstruction, Reconditioning, Resurfacing program which consists of
improvements to the County’s roadway and bridge system. This program includes new improvement projects which are broken
down into 3 categories.
1. Reconstruction – These projects typically require the complete rebuild of the road base and significant improvements to the
right-of-way including grading and drainage improvements. These projects include any major bridge or large culvert
replacements.
2. Reconditioning – These projects typically require minor improvements to the road base and will include spot ditching and
drainage improvements. Spot improvements such as vertical or horizontal hill realignments may also occur.
3. Resurfacing – These projects are the typical pavement replacements consisting of pulverizing and paving a new surface.
Very minimal work is needed outside the shoulder points.
These improvements are needed to maintain the county’s valuable infrastructure assets while also improving the safety of the brad
and bridge system for everyone traveling on the system. The plan also takes into account recommendations from the County-wide
Bicycle and Pedestrian Plan, improvements needed for future development growth, and recommendations from the Traffic Safety
Committee for safety improvements.
Cost Summary
Source of Funds FY 2026 &
Prior Years FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Project
Total
Debt Financing $4,360,800 $4,156,250 $4,755,650 $13,272,700
Grants/Aids $400,000 $200,000 $3,800,000 $4,400,000 $500,000 $9,300,000
Other: Vehicle Reg Fee $3,400,000 $3,400,000 $3,40 0,000 $10,200,000
Tax Levy $1,130,250 $1,330,000 $20,500 $2,480,75 0
Total $4,930,250 $4,560,800 $8,530,000 $8,556, 250 $3,420,500 $5,255,650 $35,253,450
Cost Documentation FY 2026 FY 2027 FY 2028 FY 2027 FY 2030 FY 2031 Project
Total
Design & Engineering $206,000 $156,000 $275,000 $55 ,000 $692,000
Site Preparation
Land Acquisition
Land Improvements $4,724,250 $4,354,800 $8,255,000 $8,451,250 $3,420,500 $5,205,650 $34,411,450
Contingency
Financing Costs $50,000 $50,000 $50,000 $150,000
Total $4,930,250 $4,560,800 $8,530,000 $8,556, 250 $3,420,500 $5,255,650 $35,253,450
Operating Impact Net $0 Net $0 Net $0 Net $0 Net $0 Net $0 Net $0
Page 83 of 88
Page 2 of 3
CIP Form 1 (12/11/2024)
Analysis of Need
The Highway Department is continuing to work with t he Highway Committee on the analysis of the level o f service and
corresponding costs to maintain the County’s road and bridge system. Program needs, public safety factors, infrastructure
life cycles are major items of consideration for the County’s 434 miles of roadway and 38 bridges. The assets are critical
county infrastructure that is important for all county residents and traveling public to ensure we have a safe and efficient
transportation system. The value of this CIP can b e realized in two major county strategic plan categ ories – I Facilitate
and Strengthen County-wide Community and Economic Development and II Provide Needed Functional, Flexible County
Facilities.
Current Condition of the County Road System - A str ong pavement preservation program consisting primar ily of
chipsealing and crackfilling has helped keep the average surface condition rates higher with 12% of our system rated fair
or worse but these maintenance projects have not ad dressed other needs such as drainage, right-of-way maintenance
and brushing, safety issues and geometric deficienc ies. Currently, 80% of the county road system is ra ted as needing
maintenance or resurfacing. Roads in poor condition can lead to vehicle damage and safety concerns. Bridges in disrepair
can lead to load posting the structures which limit the vehicles that travel over them or closing them altogether. These
issues will create more traffic on alternate routes, increase travel time, and increase costs for commuters and businesses
for commodity deliveries.
Pavement Replacement Cycle - The Highway Committee has identified a goal of approximately 10 miles per year (43-year
average life) for the resurfacing, reconditioning, reconstruction program. Below is an estimate paveme nt life based on
previous funding levels for the resurfacing, reconditioning, reconstruction program:
• 10-year average (2016-2025) = 9.4 miles/year, 46-year average life
• 3-year average (2023-2025) = 11.5 miles/year, 38-year average life
The Highway Department Capital Improvement Plan has proposed to increase the number of miles paved with additional
funding sought through various Wisconsin Department of Transportation funding programs. In recent Wis DOT funding
cycles, the Department has been successful with project grant awards of up to 80% of the project costs for CTH B, CTH R,
CTH WW bridge, CTH II bridge, and CTH A. In addition, the Department receives funding through the WisDOT Local Road
Improvement Program on an every other year basis to help offset roadway improvement costs.
Ongoing Operational Costs & Alternatives
The County roadway and bridge infrastructure system is a critical asset that requires regular preventative maintenance
in order to extend the life of these assets. These maintenance costs are not included in the CIP but include crackfilling,
chipsealing, shouldering, and other pavement repair activities in order to extend the life of these roads to 40+ years
while the industry standard is typically around 25 years of life. A balanced pavement and bridge improvement program
is meant to balance and maintain the existing operational costs. Annual operation costs for the specific roads in the CIP
are anticipated to decrease initially due to the new pavement, shoulder, and right-of-way areas. If the roads and bridges
are not improved, it will lead to higher operational costs due to more deterioration. It will also lead to more equipment
damage and down time, especially for our plow trucks.
Alternatives for the CIP would include:
1. Do nothing – pavement and bridges will continue to deteriorate leading to increased vehicle damage and costs
for vehicle repairs and travel times. It will also increase future operating costs for more maintenance of
potholes, patching, and temporary repairs.
2. Chip seal or pavement replacement only – The pavement surface will not last as long due to inadequate base
and drainage issues. Safety issues such as substandard curves, inadequate sight distance, steep side slopes, etc.
will not be addressed. The cost to replace will continue to rise over time.
3. Resurface Only – This would only address the pavement surface and not any other deficiencies or safety
concerns.
Page 84 of 88
Page 3 of 3
CIP Form 1 (12/11/2024)
Sustainability, Maintenance, and Replacement
The majority of the resurfacing, reconditioning, and reconstruction projects include pulverizing the existing road surface
which allows us to recycle valuable material and reduce costs while also increasing the structural capacity of the roads.
The newly constructed roads are scheduled for a chipseal within the first 4 years in order to seal the valuable asphalt
against the elements. The roads are then scheduled on a 7 to 10 year cycle for chipsealing and crackfilling in order to
extend their life to 40+ years. Shoulder maintenance is also routinely performed in order to protect the pavement edge
and to prevent from dangerous drop offs. This committed maintenance cycle helps extend the life of these pavements
and protects the valuable assets.
The vehicle registration fee was also enacted to provide for additional funding sustainability. The fee contributes
approximately $1.7M annually to Highway Capital Improvement Projects. These fees are typically banked and utilized
on an every-other-year basis to minimize the amount of debt for the program. In addition, the Highway Department
continues to search for alternative state and federal funding sources to help offset costs. This year’s CIP includes
approximately $7M of alternative funding for the CTH A and CTH R projects. In addition, WisDOT Local Road
Improvement Programs also help offset the costs on an every-other-year cycle ranging from $400,000 to $700,000 per
project.
Citizen & Community Impact
The Highway Improvement CIP has an impact on every Portage County citizen as well as anyone else traveling through
the County. The County transportation system is vital to local businesses and daily commerce. For major projects, the
Highway Department has a public involvement process which includes mailings, press releases, and public involvement
meeting which result in public interaction and support for the projects.
In addition, the Highway Department continues to search for alternative state and federal funding sources to help offset
costs. This year’s CIP includes approximately $7M of alternative funding for the CTH A and CTH R projects. An
additional application for the next phase of CTH A is also included in the CIP which would result in an additional $4M of
funding if selected.
Location & Map
See attached.
Previous Actions
2026-2031 Capital Plan: Updated for current plan.
Page 85 of 88
County of Portage
Finance Department
Capital Project
Funding Request Form
Policy #: TBD
Effective: November 18, 2025
Project # Project Title Salt Shed and Brine Room Expansion
Department Highway Manager Nathan Check
Phase
Budget Action Date
Project Scope & Description
This project is a multi-faceted project which will include the construction of a new salt/sand shed, expansion and utility upgrades of
the existing brine room storage area. While the project will increase the efficiencies of the Highway Department, this project will
ensure that we remain in compliance with various environmental regulations as well and provide for a more functional facility.
Due to the various aspects of the project, it will be broken up into a design phase and possibly one or two construction phases.
Cost Summary
Source of Funds 2026 &
Prior Years FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Project
Total
Debt Financing
Grants/Aids
Other(Highway Enterprise) 50,000 710,000 760,00 0
Tax Levy
Total 50,000 710,000 760,000
Cost Documentation 2026 &
Prior Years FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Project
Total
Design & Engineering 50,000 50,000
Site Preparation 10,000 10,000
Land Acquisition
Land Improvements 700,000 700,000
Contingency
Financing Costs
Total 50,000 710,000 760,000
Operating Impact
Analysis of Need
New Salt/Sand Shed – The Highway Department has 4 separate salt storage sheds located at the main shop which provides
for enough storage for the annual rock salt contract for both state and county salt. There is not eno ugh storage for our
sand/salt mixture which is utilized on secondary county roads as well as sold to local municipalities. Sand usage can vary
based on the winter season from 1,300 to 9,400 tons with averages at 4,000 ton/winter season. This sand is mixed with
5% rock salt to keep the sand from freezing. Mater ial is mixed as needed but a typical stockpile of 5 00 to 1,000 tons is
kept to ensure there is enough on-hand for any prolonged storm events.
Page 86 of 88
Page 2 of 3
CIP Form 1 (11/18/2025)
Historically, the sand/salt pile has been stored ou tside which is allowed by the Wisconsin DNR as long as the mixture is
under 5% salt and is covered or stored inside from April through October. Over the past 4 winter seas ons, we have
experienced multiple swings of temperature and rain events throughout the entire winter season which w ill dilute the
stockpile and cause salt to leach out and into the environment. These excess and unwanted chlorides h ave a negative
impact on the environment and the highway budget.
A new covered storage facility would be constructed to ensure that our sand/salt stockpile is covered year-round. The
new facility would also be constructed to house solar salt utilized in our brine making operations. This specialized salt is
an ultra-clean salt that allows the department to make brine at a faster production rate while also saving on equipment
damage from rock salt impurities and additional down time for cleaning the brine maker. Currently, this solar salt is stored
in a smaller shed located across the parking lot from the brine buildings. This leads to inefficiencies when making brine as
the material needs to be hauled by skid steer a far distance. The new storage facility would include a solar salt storage
area and be located next to the brine room.
Brine Room Utility Upgrades – The existing brine making room is adjacent to our state salt shed. When it was constructed,
the facility did not include any sewer for any wast e products. Rather, a sump pit and pump was instal led which when
filled, it would discharge to the outside of the room and onto the pavement. This waste product is typically high in chloride
concentration from our brine making operations and should not be directly discharged into the environment. The project
will evaluate either installing a holding tank whic h can then be pumped by a licensed waste hauler and sent for proper
treatment or connection to the Village sanitary sewer. If a connection is made to the Village sewer, the project will also
consider installing a new, larger water service lateral as well which will allow us to produce brine at a faster rate.
Brine Room Storage Expansion – The existing brine room has six brine storage ta nks at 3,000 gallons per tank. Brine
production and usage has increased over the years as it has been a cost-effective solution for certain storms compared to
just rock salt. As such, the WisDOT has paid for high-capacity brine makers throughout the state, including a new unit for
Portage County installed two winters ago. With the increase in capacity making and usage, a multiple day event will use
all of our current capacity. The project will evaluate adding more tank storage which would be located either outside or
within an expanded brine room area.
Ongoing Operational Costs & Alternatives
On-going Operational Costs
New Salt/Sand Shed – Minimum operational costs are expected for the new shed as it is planned to be a three sided
storage structure without utilities
Brine Room Utility Upgrades – Annual costs for the holding tank connection or Village sewer connection is expected to
be under $1,000/year.
Brine Room Storage Expansion – Minimal operational costs are expected as it would be general part replacements such
as valves needed for the storage tanks.
Alternatives
New Salt/Sand Shed – Do nothing and continue current operation with storage outside which leads to risks of chloride
loss. Depending on the season and contract amounts, there are opportunities to store excess salt in an existing shed
during the Spring and Summer but then it must be removed for fall early salt deliveries.
Brine Room Utility Upgrades – Do nothing and continue current operations which may result in regulatory enforcement.
The holding tank and sewer line options will be evaluated as part of the design phase.
Brine Room Storage Expansion – Do nothing and continue with current storage which may lead to brine shortage during
multiple day events. This may lead to additional rock salt usage and costs.
Sustainability, Maintenance, and Replacement
Page 87 of 88
Page 3 of 3
CIP Form 1 (11/18/2025)
The new shed and brine storage tanks are expected to last 25 to 50 years depending on the type selected with minimal
maintenance required.
The utility upgrades are expected to last 50 to 75 years with minimal maintenance required.
This project is meant to ultimately reduce costs from salt loss while making the facility more efficient and
environmentally sound.
Citizen & Community Impact
The sand/salt and brine are used in most every winter storm event which impacts the traveling public’s safety
throughout Portage County on county and state roads. The project will also help protect the environment, particularly
the groundwater aquifer by reducing any salt leachate into the groundwater.
County Departments such as Facilities and Parks as well as Towns and Villages also purchase sand/salt and brine from
the Highway Department which provides benefits at the local municipality level as well.
Location & Map
Highway Department – 800 Plover Road, Plover, WI 54467
Previous Actions
2027-2031 – New Project
Page 88 of 88