RecordWell Data

Public Works Committee Regular Meeting Agenda Packet (PDF)

Village of Plover · Portage County · meeting of Feb 16, 2026 · Agenda packets

Open the original document More from Village of Plover

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

PUBLIC WORKS COMMITTEE AGENDA Plover Municipal Center Board Room 2400 Post Road Plover, WI Monday, February 16, 2026 5:00 p.m. 1. Call to order 2. Approval of the minutes of the meeting of January 19, 2026, as printed 3. Person wishing to address the Committee Discussion with possible action on the following: 4. Road Plans – Green Tree Farm Subdivision – Green Tree Construction Inc - Pleasant Drive/CTH R (PIN: 173230826-16.04) 5. Presentation – New De-icing Material 6. Reports a. Public Works Manager b. Building Manager 7. Adjournment subject to call of the chair Public Works Committee Meeting 1-19-2026 Public Works Committee Monday, January 19, 2026 5:00 p.m. Members Present: Tim Durigan, Steve Fritz, Al Tessmann Members Unexcused: Adam Raabe Others Present: Gary Wolf, Steve Kunst, Scott Klemm, Julia Mann, Adam DeKleyn, Karmen Anderson, Tracy Karnitz, Lyle Lutz, Matt Saloun, Mike Helmrick 1. Tracy Karnitz called the meeting to order at 5:00 p.m. 2. Appointments: a. Ms. Karnitz called for nominations of a chairman. Mr. Fritz moved to nominate Mr. Durigan. Mr. Tessmann seconded. There were no other nominations. 3. MINUTES Mr. Fritz moved to approve the minutes of the meeting of December 15, 2025, as printed. Mr. Tessmann seconded, and the motion carried. 4. PERSONS WISHING TO ADDRESS THE COMMITTEE – None 5. PROPOSED EMPIRE ESTATES SUBDIVISION – PLOVER RD./WILSON AVE. (PIN 173230828-01.13) ROAD PLANS Mr. Klemm reviewed the request. Staff recommends approval. Mr. Fritz requests clarification regarding the cul-de-sacs. Discussion ensued regarding the distance and length of cul-de-sacs. ***RECOMMENDATION TO VILLAGE BOARD***Mr. Tessmann motioned and Mr. Fritz seconded to approve the proposed Empire Estates Subdivision Road Plans. Motion carried. 6. REPORTS a. PUBLIC WORKS MANAGER b. BUILDING MANAGER Mr. Klemm reviewed his reports. The Nay-osh-ing Chapter Dar has donated a flagpole and bench which has now been installed. The new part-time cleaner for the Municipal Building has started, which is going well. The Public Works building Public Works Committee Meeting 1-19-2026 has begun its upgrades. He reviewed the trial usage of calcium which seems to be effective. They are currently awaiting supply before applying it in the Village. His reports were combined into one rather than two separate reports. Mr. Tessmann moved and Mr. Fritz seconded to approve the reports. Motion carried. 7. Mr. Tessman motioned, and Mr. Fritz seconded to adjourn at 5:10 p.m. Motion carried. Respectfully submitted by Tracy Karnitz Village of Plover Staff Report Public Works Committee/Village Board Submitted by: Scott Klemm, Public Works Manager Date: February 12th, 2026 Subject: Approval of Green Tree Farm Road and stormwater plans Background: Village of Plover Public Works Department was provided with the attached plan set for the road, stormwater, and erosion control plans for Green Tree Farm. After reviewing the plans and the details it is in line with Village specifications. We are seeking approval of the road, stormwater, and erosion control plans with the following conditions of approval: 1. Final AECOM review and acceptance of road plans 2. Final AECOM review and acceptance of the stormwater and erosion control plans 3. All necessary permits associated with construction and stormwater 4. Due to three phases of the project over multiple years, the developer is responsible for any/all damage caused in final acceptance areas due to construction practices until all phases are accepted by Village. 5. Village has final approval of cluster box locations and designs of such locations. 6. Installation of streetlights at the intersection of Pleasant Drive and Pear Lane and CTY R and Pear Lane. 7. All private drives should be constructed with a depressed driveway specification attached to this packet. 8. Confirm new road connections at Pleasant and CTY R will not create ponding/standing water. May require milling of existing asphalt lanes for a better match. May require a field visit between parties during intersection construction. 9. Phase three construction will require coordination with the CTY R reconstruction project slated for 2028. Exhibits to include: • Exhibit 1: Review set of plans • Exhibit 2: Depressed drive specification The Village of Plover Public Works Department recommends approval of the Green Tree Farm road plans and stormwater and erosion control plan with the above-mentioned conditions. STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C1NO SCALE EBFOSSSS SS SSSSFOFO G G UMT STSS MWMPGGMCFTAC SK FOFOTSWPWEEMETEOEBWF STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C21" = 50' EBFOSSSS SS SSSSFOFO G G STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C31" = 50' EBFOSSSS SS SSSSFOFO G G STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C41" = 50' EBFOSSSS SS SSSSFOFO G G STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C51" = 50' SSFOFO STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C61" = 20' STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C71" = 20' STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C81" = 20' STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C91" = 20' G STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C101" = 20' STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C111" = 20' STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C121" = 20' STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C51" = 20' EBFOSSSS SS SSSSFOFO G G STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C141" = 50' STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C151" = 10' SSFOFO STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C161" = 20' STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C171" = 20' STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C181" = 20' GSTAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C191" = 10' SSSS FOG STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C201" = 20' G STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C211" = 20' EB SSSS SSSSSS FOFOG G STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C221" = 50' EROSION CONTROL SCHEDULING1.INSTALL PERIMETER EROSION CONTROL.2.BEGIN DEMOLITION.3.BEGIN ROUGH GRADING AND UTILITY INSTALLATION.4.GRADE DITCHES AND STORMWATER INFILTRATION BASINS.5.INSTALL BASE, CURB & GUTTER, AND ASPHALT.6.CLEANUP AND FINISH DISTURB SOIL AREAS WITH TOPSOIL, SEED, MULCH,FERTILIZER AND EROSION MAT AS NEEDED.7.DURING GRADING ACTIVITIES EXISTING GRASS AND VEGETATION, TO BEREMOVED, SHALL REMAIN IN PLACE FOR AS LONG AS POSSIBLE, TOAVOID SEDIMENT TRANSPORT.8.ALL DISTURBED AREAS SHALL BE STABILIZED, TEMPORARILY AND/ORPERMANENT, WITHIN 30 DAYS OF DISTURBANCE, OR PERMANENTLY STABILIZED WITHIN 7 DAYS OF ACHIEVING FINISHED GRADE.9.IF DISTURBED AREAS MUST BE LEFT OVER WINTER, AN ANIONICPOLYACRYLAMIDE SHALL BE APPLIED TO ALL DISTURBED AREAS PRIORTO GROUND FREEZE. SEE SPECIFICATIONS FOR DETAILS. PROPOSED EROSION CONTROL ACTIVITIES1.CONTACT DIGGER'S HOTLINE 5 WORKING DAYS PRIOR TO THE START OFDEMOLTION/CONSTRUCTION.2.NOTIFY THE LOCAL MUNICIPALITY AT LEAST 2 WORKING DAYS PRIOR TO THESTART OF SOIL DISTURBING ACTIVITIES.3.KEEP A COPY OF THE EROSION CONTROL PLANS AND STORMWATER &EROSION CONTROL MANANGEMENT PLAN ON SITE THROUGHOUT THEPROJECT.4.INSTALL ALL TEMPORARY EROSION CONTROL ELEMENTS PRIOR TO THE STARTOF DEMOLITION/CONSTRUCTION.5.ALL ACTIVITIES SHALL BE CONDUCTED IN A LOGICAL SEQUENCE AS TOMINIMIZE THE AMOUNT OF BARE SOIL EXPOSED AT ANY ONE TIME. MAINTAINEXISTING VEGETATION AS LONG AS POSSIBLE.6.CRUSHED ROCK DRIVES FOR SEDIMENT TRACKING UTILIZING 3" CRUSHEDROCK SHALL BE MAINTAINED AT ALL CONSTRUCTION ENTRANCES TO THE SITE.THE ROCK DRIVE SHALL BE A MINIMUM OF 12" THICK AND BE A MINIMUM OF 50FEET IN LENGTH BY THE WIDTH OF THE DRIVEWAY.7.PIPE DITCH CHECK SHALL BE PLACE AT ALL INLET FLOW LOCATIONS OFCULVERTS.8.CONCRETE WASHOUT TO BE PER EPA STANDARDS.9.ALL SLOPES GREATER THAN 5' HORIZONTAL TO 1' VERTICAL SHALL HAVEEROSION MAT INSTALLED.10.OFF SITE SEDIMENT DEPOSITS OCCURRING AS A RESULT OF A STORM EVENTSHALL BE CLEANED UP BY THE END OF THE NEXT WORK DAY. ALL OFF SITESEDIMENT DEPOSITS OCCURRING AS A RESULT OF CONSTRUCTIONACTIVITIES, INCLUDING SOIL TRACKED BY CONSTRUCTION TRAFFIC, SHALL ATA MINIMUM BE CLEANED BY THE END OF EACH WORK DAY. EXCESSIVEAMOUNTS OF SEDIMENT OR OTHER DEBRIS TRACKED ONTO ADJACENTSTREETS SHALL BE CLEANED BY THE END OF EACH WORK DAY. EXCESSIVEAMOUNTS OF SEDIMENT OR OTHER DEBRIS TRACKED ONTO ADJACENTSTREETS SHALL BE CLEANED IMMEDIATELY. FINE SEDIMENT ACCUMULATIONSSHALL BE CLEANED FROM ADJACENT STREETS BY THE USE OF MECHANICALOR MANUAL SWEEPING OPERATIONS ONCE A WEEK AT A MINIMUM ANDBEFORE IMMINENT RAIN EVENTS.11.DISTURBED GROUND OUTSIDE OF THE EVERYDAY CONSTRUCTION AREAS,INCLUDING SOIL STOCKPILES, THAT ARE LEFT INACTIVE FOR MORE THAN 7DAYS SHALL BE TEMPORARILY STABILIZED BY SEEDING/MULCHING OR OTHERAPPROVED METHODS.12.WASTE MATERIAL THAT IS GENERATED ON THE CONSTRUCTION SITE SHALL BEPROPERLY DISPOSED OF AND NOT ALLOWED TO RUN INTO RECEIVINGWATERS. ANY SEDIMENT OR TRASH THAT HAS MOVED OFF-SITE SHALL BESWEPT OR CLEANED UP BEFORE THE END OF THE WORK DAY.13.EROSION CONTROL DEVICES DESTROYED AS A RESULT OF CONSTRUCTIONACTIVITIES SHALL BE REPAIRED BY THE END OF EACH WORK DAY.14.INSPECT ALL EROSION CONTROL MEASURES AT LEAST ONCE A WEEK ANDAFTER ANY RAINFALL OF 0.5" OR MORE. MAKE NEEDED REPAIRS ANDDOCUMENT ALL ACTIVITIES AS PER THE REQUIREMENTS OF THE NOTICE OFINTENT SUBMITTED BY THE PROJECT CIVIL ENGINEER.15.ALL TEMPORARY EROSION CONTROL ELEMENTS SHALL REMAIN IN PLACE UNTILA SUFFICIENT GROWTH OF VEGETATION IS ESTABLISHED AND THEN BEREMOVED AS PART OF THE BASE BID.16.IF SEDIMENT LADEN WATER NEEDS TO BE REMOVED FROM THE SITE, FILTERBAGS OR SCREENING SHALL BE USED IN ACCORDANCE WITH THE WI DNRTECHNICAL STANDARDS 1061 TO PREVENT THE DISCHARGE OF SEDIMENT TOTHE MAXIMUM EXTENT PRACTICABLE.17.IF BARE SOIL IS EXPOSED DURING THE WINTER MONTHS, STABILIZATION BYMULCHING OR ANIONIC POLYACRYLAMIDE SHALL OCCUR PRIOR TO SNOW ORFROZEN GROUND.18.SILT FENCE SHALL BE INSTALLED AROUND THE TOPSOIL STOCKPILE.19.THE CONTRACTOR SHALL ONLY USE PHOSPHORUS FREE FERTILIZER FOR ALLLANDSCAPE APPLICATIONS.20.THE CONTRACTOR SHALL BE RESPONSIBLE FOR WATERING PLANTEDDISTURBED AREAS WHENEVER MORE THAN 7 DAYS OF DRY WEATHER OCCUR.21.THE CONTRACTOR SHALL PERFORM INSPECTIONS AND MONITORING OFEROSION CONTROL PRACTICES IN ACCORDANCE WITH THE WI DNR"CONSTRUCTION SITE INSPECTION REPORT" FORM 3400-187. THIS FORM CANBE FOUND ON WISCONSIN DNR WEBSITE OR PROVIDE IF NECESSARY. STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C23NO SCALE STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C24NO SCALE STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C25NO SCALE STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C26NO SCALE STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C27NO SCALE STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C28NO SCALE STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C29NO SCALE STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C30NO SCALE STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C31NO SCALE STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: DV, TV, & CBDESIGNER: DUSTIN VREELANDFILE NO.: 25-0579 ENGINEERINGPROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION SHEETSCALE:DATE: NOVEMBER 24TH, 2025 TITLE PAGE: PREPARED FOR:PLAN DATE:C30NO SCALE Village of Plover Staff Report Public Works Committee Submitted by: Scott Klemm, Public Works Manager Date: February 12th, 2026 Subject: Information on Ice Slicer RS deicing material (informational only) Background: Village of Plover Public Works Department has been currently running a trial/test of an alternative deicing material in comparison to the traditional rock salt. The trial is still early in its use and hope to have further information in the future. Below are a few factors of importance for the product trial: 1. Product works at a lower temperature of 0F vs. 15F with rock salt 2. Has an application rate of approximately 50% less per lane mile than rock salt 3. Product has less bounce and scatter during application 4. Natural gradation of product provides quicker and longer melting times along with providing traction 5. Less corrosive than rock salt 6. Environmentally friendly and causes less yellowing/deadening of vegetation/grass 7. All private drives should be constructed with a depressed driveway specification attached to this packet. Exhibits to include: • Exhibit 1: Ice Slicer specification and information sheets The Village of Plover Public Works Department is just providing this as informational and no action is required. Submitted by: Date: Subject: PUBLIC WORKS: Village of Plover Staff Report Public Works Committee Scott Klemm, Public Works Manager February 16, 2026 Public Works/Building Report 1. Snow removal operations have finally had a break. Crews have had 41 snow events to date. 2. Continue working throughout the Village doing tree trimming for clearance, hazardous trees, and vision angles. 3. Ice rinks opened January 27th. Will remain open as long as weather permits. 4. Boulders were placed on the western Lake Pacawa security perimeter berm on the soccer field area. Will need to source more boulders to complete the northern berm this summer. 5. Continue bidding/pricing and ordering new equipment approved through budget. 6. Bid opening for 2026 road projects is March 3rd at 11 am. Final list of work will be compiled after bid opening. 7. Pothole patching continues as needed and as weather allows. 8. Steve and I had an initial meeting with DNR on Village MS4 stormwater permit. More to come over next year on the steps and requirements. 9. Started planning for Earth Day and Arbor Day events. We are planning an event at Water Department and Veterans Memorial Park this year. We are planning to invite Roosevelt Elementary to the Event at Veterans Memorial. 10. Preparing to start installation of driveway and parking area for the Daniel Mahoney Conservancy off CTY. R. Buildings: 1. Had a few minor HVAC issues that have since been resolved by Point Heating at Municipal Building 2. Continued upgrades and minor remodelling at the Public Works Facility of the offices, break room, bathroom, and employee area. We will be replacing the flooring, cabinets, ceiling tile, painting, and office furniture. Flooring will be going down starting Monday and office furniture March 2nd. Should be finished with the project early March. 3. Ordered replacement shop heater at Public Works for a unit that has a cracked heat exchanger and just waiting for installation. 4. When be having a timed lock installed on the door at to the Worzella Shelter at Pacawa for easy of renters to access the building. It should help increase efficiency and fewer after-hour/weekend calls because the key did not get picked up or did not work. 5. In the final planning stages f the adult changing table install in the Family bathroom at Pacawa by the playground/splash pad. Table was purchased from a grant last year and the remaining funds will be supplied by the Lake Pacawa 5K group. This will help increase the ADA accessibility for more users at the park.

Source: Village of Plover website. First collected Oct 1, 2026.