Plan Commission Meeting — Agenda Packet
Village of Mount Horeb · Dane County · Plan Commission · meeting of Oct 28, 2026 · Agenda packets
Open the original document More from Village of Mount Horeb
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Administrative Offices
Municipal Building - 138 East Main Street
Mount Horeb, Wisconsin 53572
608.437.6884 | mounthorebwi.info
Plan Commission Meeting Agenda
Wednesday, October 28, 2026 at 7:00 PM
Mount Horeb Senior Center
107 North Grove Street
Mount Horeb, WI
1) Call to order
2) Roll call
3) Public Participation
Participants may speak for up to three minutes. To participate, please complete a public
comment form at the Board Room entrance and submit it to staff before the meeting
begins. See below for more details.
4) Consent Agenda
All items listed below are considered to be routine by the Governing Body and will be
enacted by one motion (roll call vote). There will be no separate discussion of these
items unless a Board member so requests, in which event the item will be removed
from the Consent Agenda and considered as the first item after the Consent Agenda.
a. Consideration of August 26, 2026 Meeting Minutes
5) Chair's Report
a. Chair Report
6) Staff Reports
a. Staff & Consultant Reports
7) Action Items
a. Site Plan Review: Jeff Grundahl: consider approval of the site plan application
for 208, 214, and 220 East Main Street
1. Presentation from Applicant
2. Public Participation on Application
3. Staff Comment on Application
4. Commission Discussion and Potential Action
8) Adjournment
Page 1 of 230
*Public Comment Policy
Members of the public are invited to speak at meetings of all Mount Horeb Public Bodies. To comment, please complete a Public Comment
Form at the Meeting Room entrance and submit it to staff before the meeting begins. Comments are limited to three minutes, must be made
from the podium, and the speaker must return to the audience after speaking.
• Non-agenda item comments are heard at the start of the meeting. Public Body members and staff will not engage in discussion
during public comment but may consider topics for future agendas.
• Agenda item comments are heard during the relevant item, after the proposers or staff present the item and before Public Body
discussion. All public comments on the item will be heard before any discussion by the Public Body.
Members of the public will only be allowed to speak outside these public comment times if they are invited by the meeting chair to share
additional information requested by the Public Body. If so invited to speak, the member of the public must do so from the podium.
Written comments are also welcome. Written comments shall include the name and address of the submitter and should be submitted to the
Deputy Treasurer/Governance Coordinator by email at niki.erickson@mounthorebwi.info (subject line: Public Comment Request-Name of
Public Body) or delivered by to the Village at: 138 E Main Street, Mount Horeb WI, 53572, ATTN Public Comment Request-Name of Public
Body.
UPON REASONABLE NOTICE, EFFORTS WILL BE MADE TO ACCOMMODATE THE NEEDS OF DISABLED INDIVIDUALS THROUGH
APPROPRIATE AIDS AND SERVICES. FOR INFORMATION OR TO REQUEST THIS SERVICE, CONTACT ALYSSA GAFFNEY, CLERK,
AT 138 E MAIN STREET, MOUNT HOREB, WI (608) 437-9404.
Page 2 of 230
PLAN COMMISSION AGENDA
Wednesday, August 26, 2026 at 7:00 PM
DRAFT MEETING MINUTES
1) Call to order
Chair Ryan Czyzewski called the meeting to order at 7:00 pm in the Board Room of the
Municipal Building, 138 East Main Street, Mount Horeb, WI.
2) Roll call
Members Present: Ryan Czyzewski, Stephanie Gauthier-Phillips, Andrew Kidd, Jill Remmert-
Willis, Ben Vondra, Peggy Zalucha
Members Absent: Sarah Best
Others Present: Village Administrator Gabe Altenbernd, Village Planner Sonja Kruesel, Assistant
Clerk Jean Culberson
3) Public Comments on Non-Agenda Items
None.
4) Consent Agenda
a. Consideration of July 22, 2026 Meeting Minutes
Zalucha Motioned to approve the Consent Agenda and Remmert-Willis seconded.
Motion carried by unanimous voice vote.
5) Agenda Items
a. Extra Territorial Jurisdiction CSM: Joe Voell: consider approval of an ETJ CSM for Joe
Voell in the Town of Springdale.
Kruesel summarized the CSM. Kidd Motioned to approve the ETJ CSM Zalucha
seconded. Motion carried by unanimous voice vote.
b. Certified Survey Map: John Temby: consider approval of the certified survey map
Kruesel summarized and informed Planner Ben Rohr recommended a rezone to
Conservancy. Vondra Motioned to approve the CSM conditioned on the rezone. Zalucha
seconded and Motion carried by unanimous voice vote.
c. Hidden Ridge Subdivision
1. Public Hearing: public hearing regarding the request to rezone property
located at parcel #0606-121-1208-8 from Parks and Recreation [PR] to
Conservancy [CON]
Kruesel summarized the project including Planner Ben Rohr’s
recommendations in the August 26, 2026 Review Report in the agenda
packet. Wade from Wyser Engineering discussed the CSM and requested
removal of the 11,600 sq ft in recommendations 1 and 3.
Public Hearing opened at 7:12pm
Resident Jim Larson at 122 Jennifer Circle spoke in favor of the project.
Public Hearing closed at 7:13pm
Page 3 of 230
2. Rezone: Consider approval of an amendment to the Official Zoning Map to
rezone property located at parcel #0606-121-1208-8 from Parks and
Recreation [PR] to Conservancy [CON]
Gauthier-Phillips Motioned to approve the Zoning Map Amendment from AG to
Conservancy for outlot 1 subject to conditions a) and b). Kidd seconded and
Motion carried by unanimous voice vote.
3. Final Plat: consider approval of the Hidden Ridge Subdivision Final Plat
Gauthier-Phillips Motioned to approve the Final Plat subject to the stated
conditions a) and b) in the recommendations and removal of the 11,600 square
foot language. Vondra seconded and Motion carried by unanimous voice vote.
d. Specific Implementation Plan: JT Klein, Inc: consider approval of Amendment
No.2 to the SIP
Kruesel and JT Kein representatives summarized the amendment of the exterior
building material from stone to brick. The Commission discussed the request.
Zalucha Motioned to approve Amendment No.2 to the SIP and Remment-Willis
seconded. Motion carried by unanimous voice vote.
e. Site Plan Review: Village of Mount Horeb: consider approval of the Grundahl
Park Building Site Plan
Kruesel summarized the Recommendations in the August 26, 2026 Site Plan Review in
the agenda packet. Andrew Kidd recused himself from the item. The Commission and
Parks Superintendent Jeff Gorman discussed the façade and if it was possible to add
windows, décor or brick. The Commission recommended staff research design
guidelines for Village projects. Gauthier-Phillips Motioned to approve the Site Plan
subject to the following conditions waived: the curbing for paved areas, design
requirement for building materials, articulation, window and door openings, and the
durable base material. Additional Requests: the Parks and Rec to considered aesthetic
improvements to the building (outside of building materials) and the photometric plans
to be reviewed by staff. Zalucha seconded and the Motion carried by unanimous voice
vote.
f. Site Plan Review: Premier Cooperative: consider approval of the site plan
application for 501 West Main Street
Kruesel summarized the Recommendations in the August 26, 2026 Site Plan Review in
the agenda packet. Matt Severson from Premier Cooperative informed the Commission
that the Project Narrative was submitted late and the recommendations were met with
exception to the windows. Czyzewski recommended staff to review the design
recommendations and refer back to the Commission if needed. Czyzewski Motioned to
the approval of the Site Plan waiving the requirement for the windows. Kidd seconded
and the Motion carried by unanimous voice vote.
g. Conceptual Review: Premier Cooperative: requesting an initial concept review for a
proposed expansion.
Administrator Altenbernd and Matt Severson from Premier Cooperative spoke on the
expansion and the dead-end for West Garfield Street. Wade Wyser from Wyser
Engineering spoke on the future land use map plans and Meadow View Road as an
extension for future development. The Commission discussed the expansion including
The crossing at Highway ID and vacating West Garfield Street. Applicant will proceed
with the next steps.
Page 4 of 230
6) Chair Report
No Report.
7) Staff Report
a. Village Planner
Altenbernd informed on the Technical Staff meeting and a future agenda item regarding
Sienna Hills.
b. Building Inspector
Report in Packet.
8) Meeting adjournment.
Kidd Motioned to adjournment at 9.02 pm and Remment-Willis seconded. Motion carried by
unanimous voice vote.
Minutes by Clerk Jean Culberson
Page 5 of 230
Agenda Item Report
Plan Commission: Wednesday, October 28, 2026
Chair's Report: Chair Report
Recommendation
Background
Thank you to all in attendance and participation tonight. A special thank you to our Video crew for their work
on the satellite setup, as I know the offsite meetings are not easy to setup, nor conducive to capturing
effective Commission discussion. I apologize for missing this month’s Plan Commission meeting, I have a
previously booked engagement scheduled since April. Thank you Trustee Best for serving as Chair tonight and
helping ensure the meeting runs effectively with the help of the Commission, Staff, and Public.
Looking at this month’s agenda, I know the Plan Commission members and staff have performed their due
diligence to ensure agenda items receive the attention they deserve so questions are answered tonight. As
always, I have prepared some agenda comments and questions to Village Administrator Gabe Altenbernd
that he may share with the Commission. As always, I extend my appreciation to Plan Commission members
for your service in reviewing projects that while you work to address Mount Horeb’s Comprehensive Plan.
The work this body has done over the past several years for the Comprehensive Plan and then Zoning Code
rewrite was a long road with lots of discussion, analysis, and healthy debate. Not everyone will agree with all
aspects of those, or of a particular project or its components. However, these public processes established
the roadmap and rulebook for the Village, applicants, and public to follow.
In the near future the Plan Commission will be reviewing and recommending technical updates to the zoning
code as previously planned and discussed. And, rather than wait 40 years, expect future potential policy
components to be reviewed and updated to match future Board strategic planning and Comprehensive Plan
updates. We are all getting use to this fundamental shift in how applications process through the Village,
primarily seen by less PUD applications. I appreciate staff help with the learning curve.
Financial Impact
n/a
Attachments
Prepared By
Ryan Czyzewski, Village Board President
Page 6 of 230
Agenda Item Report
Plan Commission: Wednesday, October 28, 2026
Staff Reports: Staff & Consultant Reports
Recommendation
Background
Financial Impact
N/A
Attachments
Prepared By
1. August Permits & Inspector Update
2. Sept Permits & Inspector Update
Page 7 of 230
Building Department Report
August 2026 Permits
• 3 General Commercial Permits
• 1 Single Family Residential – Windflower Village
• 40 General Residential Permits
Commercial Project Progress Report
August 2026
__________________________________________________________________________________________
105 W Front Street / Front Street Station
Construction continues on the Front Street Station project. Wood framing of the building is now underway,
with required inspections and trade coordination continuing as construction advances.
207 Academy Street / Primary Center
Construction continues at the Primary Center. Wall erection and floor installation are underway, with required
inspections, testing documentation, and trade coordination continuing as the project advances.
900 E Garfield Street / Middle School
The two new bathrooms within the existing boys locker room have been completed.
Prepared by: Ryan Lindsey, 3C Inspect LLC
Page 8 of 230
Building Department Report
September 2026 Permits
• 3 General Commercial Permits
• 1 New Commercial TJK Design – 100 Lillehammer – 5 unit
• 2 Single Family Residential – Brookstone Hills & North Cape
• 28 General Residential Permits
Village of Mount Horeb
Building Department
Commercial Project Progress Report
September 2026
October 28, 2026 Plan Commission | Updates through October 22, 2026
_______________________________________________________________________________________
105 W Front Street / Front Street Station
Construction and electrical work continued during September, along with required plan and inspection coordination.
Roof-truss inspection was scheduled for October 19. Signage review is scheduled for the November 18 Plan Commission
meeting.
401 South Second Street / Mount Horeb Elementary School
Formerly the Primary Center at 207 Academy Street. Addition work continued with slab construction and underground
electrical installation. Concrete testing documentation was received in September; underground conduit work in Areas C
and D was nearing completion in early October.
101 and 103 Perimeter Road / JT Klein Apartments
Both early-start permits have been approved and paid. Footing and foundation work may proceed under those permits.
Full building plan review remains in progress.
100 Lillehammer Lane / Multi-Tenant Commercial Building
All permits have been approved, and footing work is planned to begin the week of October 26. An onsite meeting with
the superintendent is scheduled for Monday, October 26.
500 N 8th Street / Gunderson Funeral Home
Plans for replacement of the crematory equipment were submitted for review in September. Conditional building plan
approval was received October 16.
Prepared by: Ryan Lindsey, 3C Inspect LLC
Page 9 of 230
PLAN COMMISSION APPLICATION
PROJECT NAME: _______________________________________________________________________________________________________
Project Address ______________________________________________ Parcel Number: __________________________________
Access Dane Link
Zoning Map
Current Zoning_______________________________ Future Land Use Zoning: __________________________________________
(select zoning layer in map) (select future land use layer in map)
APPLICANT:
ADDRESS:
PHONE: EMAIL:
OWNER:
ADDRESS:
PHONE: EMAIL:
PROJECT DESCRIPTION: _________________________________________________________________________________________
______________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________
OWNER/APPLICANT SIGNATURE: ________________________________________________________DATE: ___________________
FEES & DEPOSITS
: (CHECK ALL THAT APPLY)
Application Fee Public
Hearing-
Certified Survey Map (CSM) scroll to Section 18.61 in schedule Schedule
Certified Survey Map Extraterritorial scroll to Section 18.61 in schedule Schedule
Comprehensive Plan Amendment $150.00 Class One
Conditional Use Permit (changes in USE of property) $150.00 Class Two
Conditional Use Permit (planned development district)
$200.00 Class Two
Design Review $100.00
General Development Plan (GDP) $200.00
Specific Improvement Plan (SIP) $300.00
Zoning Amendment (changes in zoning) $150.00 Class Two
Zoning Amendment (planned development district) $200.00 Class Two
VILLAGE OF MOUNT HOREB
Zoning Administrator 608-437-9409
138 East Main Street
Mount Horeb, WI 53572
Developer Deposit:
An escrow deposit is
required in accordance
with the Development
Application Agreement.
Total Fee Paid:
____________
Date: ______________
Fee Waived By:
____________________
Page 10 of 230
The Village of Mount Horeb Plan Commission meets the fourth Wednesday of the month, unless
noted on calendar. A schedule of deadlines can be found on the Zoning page of the Village
website: Plan Commission Calendar. Consultation with the Village Administrator is highly
encouraged to discuss procedure and necessary forms prior to any submittal.
Note: applications requiring a public hearing will be scheduled for a hearing according to the
publication deadline, with action considered at the scheduled Plan Commission meeting following the
public hearing. Applicants are encouraged to contact the Village Administrator for a pre-application
meeting to review the project and submittal requirements prior to submitting an official application.
Class One = Published in newspaper for one week / Class Two = Published in newspaper for two weeks
Application submittals should include:
• Fully executed Plan Commission Application
• Fully executed Development Application Agreement (attached)
• A development agreement is a voluntary contract between a local jurisdiction and a
person who owns or controls property withing the jurisdiction, detailing the
obligations of both parties and specifying the standards and conditions that will
govern development.
• Full payment for all associated fees
• Written narrative of the proposed project
• One electronic copy of full submittal emailed to (2 parties)
gabe.altenbernd@mounthorebwi.info
and mhbuildinginspector@mounthorebwi.info,
• or provided to our offices on a USB device or submitted via downloaded file
All submittals must contain the following to be considered complete:
1) Written narrative must include:
a. Owner and/or developer names and addresses
b. Where applicable; architect and/or engineer names and addresses
c. Description of proposed uses
d. Calculation indicating total site size, building floor area, number of parking stalls,
amount of impervious surface, and amount of non-impervious green space
2) A scaled site plan which must include:
a. Name of project and date of plan preparation
b. Scale of drawing and north arrow
c. Property boundaries
d. Where applicable; both the one hundred (100) year recurrence interval floodplain
and the floodway delineations
e. Where applicable; wetlands as delineated in the WDNR Wetland Inventory and 75’
setback line from such wetlands
f. Existing and proposed easements on the subject property
g. Adjoining public street rights-of-way, street pavements, and sidewalk locations;
existing and proposed driveways and curb cuts; and parking and loading areas
h. Location of existing and proposed building footprints with building and yard setback
lines indicated
i. Location and size of any existing or proposed signs and fencing
j. Location and type of all outdoor lighting proposed to illuminate the site; including a
photometrics plan of the site.
3) Building Plans which must include:
Page 11 of 230
a. Elevation drawing of each new or remodeled building façade, indicating height,
materials and building dimensions
b. Colored renderings of all façades of the principal building showing the proposed
colors
c. Building materials samples (upon request)
4) Grading and Stormwater Management Plan, including:
a. Existing and proposed topography shown at a contour interval of not less than two
(2) feet at National Geodetic Vertical Datum
b. Location and dimension of Stormwater retention or detention basins and/or
stormwater conveyances
5) Landscape Plan that meets all landscaping standards
6) Parking Calculations
7) Escrow fees as outlined in the Development Application Agreement
8) Erosion Control and Stormwater Management Application and fees. *No person may begin a
land disturbing construction activity or land developing activity subject to this division until
the person has paid the Erosion Control Review and Inspection fee.
9) Erosion Control Plan
10) Signage Plan
11) Design Review guideline
12) Refer to Mount Horeb Village Code Chapter 17- Zoning Code for all supporting details of
required documentation.
Please note Chapter 17 is the new adopted code Effective as of March 12, 2026
Page 12 of 230
DEVE
LOPMENT APPLICATION AGREEMENT
This Development Application Agreement (the “Agreement”) is made and entered into
this day of , , by and between the Village of Mount Horeb, a
Wisconsin municipal corporation (the “Village”), and (the
“Applicant”).
RECITALS
A. The Applicant plans to file, or has filed, an application for approval by the Village of one
or more of the following activities within the Village’s jurisdiction: site plan / conditional
use permit / rezone / variance / other development (hereinafter refe rred to as the
“Development”).
B. The Village desires to review and take action on the Development in a timely manner in
accordance with all applicable federal, state and local laws and regulations, and without
unreasonable expense to Village taxpayers.
C. The
Applicant agrees and acknowledges that decisions and approvals regarding the
Development are legislative determinations to be made in the Village’s discretion and that
the Applicant’s compliance with this Agreement does not, in any way, entitle the Applicant
to approval of the Development.
D. The
process of reviewing the plans and documents associated with the Development will
cause the Village to incur direct and indirect expenses including, but not limited to, staff
time and fees and expenses incurred by the Village for outside consultant ser vices related
to review of the Development ( e.g., engineers, attorneys, accountants, planners, and other
professionals).
NO
W, THEREFORE, for and in consideration of the mutual covenants contained
herein, and for good and valuable consideration, the Village and the Applicant agree as follows:
1. Re
citals. The representations and recitations set forth in the foregoing paragraphs are
material to this Agreement and are hereby incorporated into and made a part of this
Agreement as though they were fully set forth in this paragraph.
2. Appl
icant to Reimburse Village Review Costs. The Applicant shall reimburse the Village
for all direct and indirect costs and expenses related to the Village’s review of the
Development. The direct and indirect costs and expenses include, but are not limited to,
staff time and fees and expenses incurred by the Village for outside consultant services
(e.g., engineers, attorneys, accountants, planners, and other professionals). For purposes
of this Agreement, the direct and indirect costs and expenses shall be referred to as
“Review Costs.” Village staff time shall be charged at
current rates.
Page 13 of 230
3. Deposit Required to Fund Reimbursement Account.
a. To ensure that funds are readily available to the Village for reimbursement of
the Review Costs as provided in paragraph 2 above, the Applicant shall deposit
with the Village an amount determined by the Village Zoning Administrator to
be used to pay the Re view Costs (the “Deposit”). The Village Zoning
Administrator shall use the following table as a guide to determine the amount
of the Deposit:
(1) Small additions (<2,500 sf) shall require a $1,500 Deposit.
(2) Small-sized projects (<5,000 sf) shall require a $3,500 Deposit.
(3) Medium-sized projects (<10,000 sf) shall require a $5,500 Deposit.
(4) Large-sized projects (>10,000 sf) shall require a $10,000 Deposit.
(5) In addition to the amounts identified in (1) through (4), any Development
that requires a development agreement or tax incremental financing
assistance from the Village shall require an additional $5,000 to $10,000
Deposit.
All Deposit amounts shall be determined by the Village Zoning Administrator
in his/her sole discretion and are not subject to challenge by the Applicant.
Generally small additions will be less than 2,500 square feet, small projects less
than 5,000 square f eet, medium projects less than 10,000 square feet and large
projects are over 10,000 square feet.
b. The Applicant is responsible for payment of all Review Costs regardless of
whether the amount exceeds the amount initially deposited with the Village. The
Village reserves the right to require the Applicant to deposit additional amounts
if the Village Zoning Administrator determines that additional amounts are
necessary because of the size of the Development or because the Reimbursement
Account (defined below) has been depleted.
c. The Deposit may be provided in the form of cash, a certified check, cashier’s
check, personal check, or some other form as approved by the Village.
d. The required Deposit must be made by the Applicant upon execution of this
Agreement.
e. The Applicant agrees and acknowledges that the Village will not process the
application(s) associated with the Development and that the Village may
suspend or otherwise stop activities associated with the Development if the
Applicant fails to comply with this Agreement.
f. The Village shall place and maintain the Deposit in a segregated, non- interest-
bearing account to be used solely for the purpose of reimbursing the Review
Costs in accordance with paragraph 4 below (the “Reimbursement Account”).
2
Page 14 of 230
4. Village Withdrawals from the Reimbursement Account.
a. After complying with the notification requirements of paragraph 4.b. below, the
Village is entitled to make withdrawals from the Reimbursement Account to pay
Review Costs in accordance with paragraph 2 above.
b. Not less than 5 days prior to making any withdrawal from the Reimbursement
Account, the Village shall provide the Applicant with an itemized invoice for
Review Costs incurred, together with a written notice of the Village’s intent to
withdraw such funds from the Reimbursement Account.
c. Withdrawals from the Reimbursement Account may be made as often as
necessary to reimburse the Review Costs. In the event that the balance of
Applicant’s Reimbursement Account reaches $1,000 or less, the Village shall
have the discretion to continue withdra wing funds from the Reimbursement
Account; to invoice the Applicant directly for payment; or to require the
Applicant to pay additional monies to the Village, which monies shall be
deposited in the Reimbursement Account. Payments for directly invoiced bill s
shall be due 30 days from the date the invoice is mailed to the Applicant.
d. Any amounts remaining in the Reimbursement Account after the Village as
taken final action on the Development and all Review Costs have been paid shall
be promptly refunded to the Applicant.
5. Authority/Binding Effect . The parties agree that the undersigned signatories to this
Agreement have full power and authority to act on behalf of the Village and the
Applicant, and that all necessary and enabling resolutions have been enacted. This
Agreement shall bind the heirs, successors and assigns of the Applicant and the Village.
6. Notification of Parties.
Any notices to be provided under this Agreement may be made by delivery in person,
by First Class mail, or by electronic mail (request a read receipt required) as provided
below:
To Village: Village of Mount Horeb
Village Administrator
138 East Main Street
Mount Horeb, WI 53572
Email: gabe.altenbernd@mounthorebwi.info
3
Page 15 of 230
To Applicant:
Email:
7. Severability. If any provision of this Agreement is deemed invalid, then the invalidity
of said provision shall not affect the validity of any other provision hereof.
8. A
mendment, Withdrawal, or Release. This Agreement may be withdrawn, amended or
released only by a written document duly executed by both parties.
9. E
ffective Date. This Agreement shall be effective commencing on the date indicated
in the first paragraph above.
I
N WITNESS WHEREOF, the parties have caused this Agreement to be executed by
the duly authorized individuals and officers below.
VILLAGE OF MOUNT HOREB
By: ______________________
Village Administrator Gabe Altenbernd
APPLICANT
By:
Print name:
Title:
4
Owner/Developer
Page 16 of 230
TRASH
ELEV.
STAIRS STAIRS APT. STAIR ENTRY
101
PARKING GARAGE
245'-10"
51 TOTAL PARKING SPACES
BIKE PARKING
117'-0 1/2"
ELEC.
VERTICAL BIKE RACK
18'-0" 19'-7" 196'-8" 9'-6"
60'-7" 14'-0" 20'-7" 58'-3" 47'-2" 43'-5"
TYP.
18'-0" 24'-0" 18'-0" 56'-0"
ENTER ONLY
EXIT ONLY
24'-4" 37'-0" 21'-0"
HORIZONTAL RHYTHM SPACING
38'-6" 28'-10" 7'-1" 29'-3" 25'-10" 10'-6" 23'-6"
APARTMENT
AMMENITY
1,065 SF
HOOD
CHASE
ABOVE
COMMERCIAL SPACES
BOMA CALC
7,307 SF
COMMERCIAL SPACE
BOMA CALC
2,874 SF
B1
A301
B1
A301
A1
A302
A1
A302
C1
A302
C1
A302
C1
A301
C1
A301
73'-9" 43'-4"
(22 STALLS)
(10 STALLS)
(7 STALLS)
2811 SF
TENANT 1
1331 SF
TENANT 2
1377 SF
TENANT 3
4367 SF
TENANT 4
WATER SERVICE &
SPRINKLER RISER
44'-0"
44'-0"
8'-6"
TYP.
9'-0"
8'-6"
(7 STALLS)
TYP.
9'-0" 9'-6"
TYP.
9'-0"
(4 STALLS)
ONE WAY
CONVEX SAFTEY MIRRORS
ONE WAY
ONE WAY
0' 3/8"
0' 4' 8' 16'
3/4" 1 1/2"
SCALE: 3/32" = 1' -0"
2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570
© SKETCHWORKS ARCHITECTURE, LLC, 2024
LANGHUS ON MAIN
FLOOR PLANS
1 OF 8 DATE: 10/26/26
PLAN
NORTH
TRUE NORTH ROTATION
FIRST FLOOR
• RESIDENTIAL UNITS: 42 TOTAL
• PARKING STALLS: 51 TOTAL
• BIKE PARKING: 53 TOTAL
• COMMERCIAL SPACE: 10,181 SF
(LEASEABLE BOMA CALC TOTAL)
FIRST FLOOR PLAN - COMMERCIAL SPACE, TENANT PARKING
Page 17 of 230
SHOWER
REF
SHOWER
SHOWER
REF
REF
SHOWER
REF
SHOWER
SHOWER
REF
REF
REF REF
REF
SHOWER REF
SHOWER
SHOWER
REF
REF
REF
REF REF
SHOWER
REF SHOWER REF
SHOWER
SHOWER
REF
SHOWER
REF
REF
SHOWER
SHOWER
889 SF
1 BED / DEN
555 SF
STUDIO
642 SF
STUDIO
1128 SF
2 BED
717 SF
1 BED
1104 SF
2 BED
764 SF
1 BED
958 SF
1 BED / DEN
1173 SF
2 BED
726 SF
1 BED
834 SF
1 BED
877 SF
1 BED
807 SF
1 BED
692 SF
1 BED
686 SF
1 BED
749 SF
1 BED
747 SF
1 BED
1105 SF
2 BED
1511 SF
STORAGE
STAIR
STAIR
ELEV
ELEV
LOBBY
1139 SF
1 BED / DEN
80 SF
CHASE
A1
A301
A1
A301
TYPE A UNIT
805 SF
STORAGE
652 SF
MECH
1132 SF
GYM
2 BED
B1
A301
B1
A301
1114 SF
14 UNITS
30 UNITS
A1
A302
A1
A302
C1
A302
C1
A302
C1
A301
C1
A301
0' 3/8"
0' 4' 8' 16'
3/4" 1 1/2"
SCALE: 3/32" = 1' -0"
2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570
© SKETCHWORKS ARCHITECTURE, LLC, 2024
LANGHUS ON MAIN
FLOOR PLANS
2 OF 8 DATE: 10/26/26
PLAN
NORTH
TRUE NORTH ROTATION
SECOND FLOOR
20 TOTAL UNITS
a. (2) STUDIO
• GROSS SF: 1,193
b. (10) 1 BED
• GROSS SF: 7,599
c. (3) 1 BED / DEN
• GROSS SF: 2,986
d. (5) 2 BED
• GROSS SF: 5,604
GYM
STORAGE
MECHANICAL
SECOND FLOOR CONCEPT PLAN
Page 18 of 230
SHOWER
REF
SHOWER
REF
SHOWER REF
SHOWER
REF
REF
SHOWER
REF
REF
SHOWER
SHOWER
REF
REF
SHOWER
REF
REF
REF
REF
REF
REF
SHOWER
REF
SHOWER
REF
SHOWER
REF
SHOWER
REF
SHOWER
REF
SHOWER
REF
SHOWER
REF
SHOWER
762 SF
1 BED
756 SF
1 BED
785 SF
1 BED
726 SF
1 BED
1163 SF
2 BED
717 SF
1 BED
1129 SF
2 BED
641 SF
STUDIO
555 SF
STUDIO
848 SF
1 BED / DEN
807 SF
1 BED
587 SF
STUDIO
591 SF
STUDIO
765 SF
1 BED
765 SF
1 BED
564 SF
COMMUNITY ROOM
749 SF
1 BED
STAIR
ELEV
ELEV
LOBBY
STAIR
767 SF
1 BED
A1
A301
A1
A301
701 SF
STUDIO
863 SF
1 BED / DEN
1118 SF
2 BED
104'-10" 63'-5" 19'-0" TO PROP. LINE 60'-3"
590 SF
STUDIO
77 SF
CHASE
EXIT
834 SF
1 BED
B1
A301
B1
A301
2818 SF
COMMUNITY PATIO
TYPE A A1
A302
A1
A302
C1
A302
C1
A302
C1
A301
C1
A301
0' 3/8"
0' 4' 8' 16'
3/4" 1 1/2"
SCALE: 3/32" = 1' -0"
2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570
© SKETCHWORKS ARCHITECTURE, LLC, 2024
LANGHUS ON MAIN
FLOOR PLANS
3 OF 8 DATE: 10/26/26
PLAN
NORTH
TRUE NORTH ROTATION
THIRD FLOOR - CONCEPT PLAN
THIRD FLOOR
22 TOTAL UNITS
a. (6) STUDIO
• GROSS SF: 3,661
b. (11) 1 BED
• GROSS SF: 8,433
c. (2) 1 BED / DEN
• GROSS SF: 1,711
d. (3) 2 BED
• GROSS SF: 3,400
COMMUNITY ROOM
COMMUNITY PATIO
Page 19 of 230
T.O. TRUSS
137' -11 3/4"
FIRST FLOOR
100' -0"
2
6
7
10
20
13
14
15
21
FOREGROUND OUTLINE OF MHTC BUILDING
MAX BUILDING HEIGHT
140' -0"
PARAPET MAX.
145' -0"
16
1
19
12
7
24
25
14
A1
A302
A1
A302
C1
A302
C1
A302
T.O. TRUSS
137' -11 3/4"
FIRST FLOOR
100' -0"
1 5
6 7
2
5
16
15
14
21
14
15
25 13
15
17
1 15
22
17
20
OUTLINE OF
MHTC BUILDING
23
MAX BUILDING HEIGHT
140' -0"
3
3
B1
A301
B1
A301
PARAPET MAX.
145' -0"
6'-0"
1
11 18
18
8 8
218 12
11
4
4
24
7
20
8
15
C1
A301
C1
A301
STONE BENCH
0' 1/4"
0' 2' 4' 8'
1/2" 1"
SCALE: 1/8" = 1' -0"
2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570
© SKETCHWORKS ARCHITECTURE, LLC, 2024
LANGHUS ON MAIN
ELEVATIONS
4 OF 8 DATE: 10/26/26
WEST ELEVATION - COLORED
SOUTH ELEVATION - COLORED
EXTERIOR ELEVATIONS KEYNOTE SCHEDULE
# DESCRIPTION COLOR
1 CLAY BRICK MASONRY - FULL BED RED/BROWN BLEND COUNT RY CLUB -TUMBLED - ACME BRICK
2 CLAY BRICK MASONRY - RED TONE ASHBURY - BRICKCRAFT
3 CLAY BRICK MASONRY - TAN/ BROWN BLEND CEDAR CREEK - BRICKCRAFT
4 CLAY BRICK MASONRY - TAN/ BROWN CEDAR CREEK SOLDIER COURSING
5 LIMESTONE MASONRY HILLCREST STONE - WHEAT
6 LP SMARTSIDE SIDING - BOARD AND BATTEN SHERWIN WILL IAMS - ROYCROFT MIST GRAY
7 LP SMARTSIDE - BOARD AND BATTEN SHERWIN WILLIAMS - HAMMERED SILVER
8 LP SMARTSIDE LAP SIDING SHERWIN WILLIAMS - SEALSKIN
9 LP SMARTSIDE LAP SIDING DESERT STONE
10 CONCRETE MASONRY UNIT BUFF - COUNTY MATERIALS
11 ARCHITECTURAL PANEL SIDING SHERWIN WILLIAMS - PEWT ER GREEN
12 <varies> BRONZE FINISH
13 CORBLE ACCENT PANEL SHERWIN WILLIAMS - SEALSKIN
14 METAL BALCONY AND RAILING MEDIUM - DARK BRONZE
15 CONCRETE MASONRY COPING LIGHT GREY/ CONCRETE
16 LP SMARTSIDE - TRIM BOARDS DESERT STONE
17 COMPOSITE WOOD TRIM BOARDS, DECORATIVE SHERWIN WIL LIAMS - SEALSKIN
18 TRIM ACCENTS SHERWIN WILLIAMS - ROOKWOOD BLUE GREE N
19 CEDAR SHAKE ROOF MEDIUM - LIGHT WOOD
20 METAL CANOPY BRONZE TONE
21 FABRIC AWNING COLOR TBD PER TENANT
22 LINTEL OVER WINDOWS AND OPENINGS MEDIUM - LIGHT MA SONRY UNIT OR FAUX WOOD ELEMENT
23 GREEN ROOF LIFEROOF PRODUCT OR SIMILAR
24 CORBLE ACCENT PANEL SHERWIN WILLIAMS - CREAMY
25 CORBLE ACCENT PANEL SHERWIN WILLIAMS -TAWNY TAN
Page 20 of 230
ALLEY
106' -7"
6
7
10
13
14
7
6
7
8
10
13
11
14
15
ELECTRICAL
METERS
LOUVER
GAS METERS
LOUVERS
MAX BUILDING HEIGHT
140' -0"
EXIT ONLY AT
GARAGE DOOR
B1
A301
B1
A301
PARAPET MAX.
145' -0"
8
11 11
C1
A301
C1
A301
SAFTEY
MIRRORS
ALLEY
106' -7"
T.O. TRUSS
137' -11 3/4"
FIRST FLOOR
100' -0"
1
15
13
7
19
14
17
18
22
17
9
13
20
MAX BUILDING HEIGHT
140' -0"
3
ENTRANCE ONLY
AT GARAGE DOOR
PARAPET MAX.
145' -0"
16
6
10
4
15 8
15
17
17
A1
A302
A1
A302
C1
A302
C1
A302
0' 1/4"
0' 2' 4' 8'
1/2" 1"
SCALE: 1/8" = 1' -0"
2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570
© SKETCHWORKS ARCHITECTURE, LLC, 2024
LANGHUS ON MAIN
ELEVATIONS
5 OF 8 DATE: 10/26/26
NORTH ELEVATION - COLORED
EAST ELEVATION - COLORED
EXTERIOR ELEVATIONS KEYNOTE SCHEDULE
# DESCRIPTION COLOR
1 CLAY BRICK MASONRY - FULL BED RED/BROWN BLEND COUNT RY CLUB -TUMBLED - ACME BRICK
2 CLAY BRICK MASONRY - RED TONE ASHBURY - BRICKCRAFT
3 CLAY BRICK MASONRY - TAN/ BROWN BLEND CEDAR CREEK - BRICKCRAFT
4 CLAY BRICK MASONRY - TAN/ BROWN CEDAR CREEK SOLDIER COURSING
5 LIMESTONE MASONRY HILLCREST STONE - WHEAT
6 LP SMARTSIDE SIDING - BOARD AND BATTEN SHERWIN WILL IAMS - ROYCROFT MIST GRAY
7 LP SMARTSIDE - BOARD AND BATTEN SHERWIN WILLIAMS - HAMMERED SILVER
8 LP SMARTSIDE LAP SIDING SHERWIN WILLIAMS - SEALSKIN
9 LP SMARTSIDE LAP SIDING DESERT STONE
10 CONCRETE MASONRY UNIT BUFF - COUNTY MATERIALS
11 ARCHITECTURAL PANEL SIDING SHERWIN WILLIAMS - PEWT ER GREEN
12 <varies> BRONZE FINISH
13 CORBLE ACCENT PANEL SHERWIN WILLIAMS - SEALSKIN
14 METAL BALCONY AND RAILING MEDIUM - DARK BRONZE
15 CONCRETE MASONRY COPING LIGHT GREY/ CONCRETE
16 LP SMARTSIDE - TRIM BOARDS DESERT STONE
17 COMPOSITE WOOD TRIM BOARDS, DECORATIVE SHERWIN WIL LIAMS - SEALSKIN
18 TRIM ACCENTS SHERWIN WILLIAMS - ROOKWOOD BLUE GREE N
19 CEDAR SHAKE ROOF MEDIUM - LIGHT WOOD
20 METAL CANOPY BRONZE TONE
21 FABRIC AWNING COLOR TBD PER TENANT
22 LINTEL OVER WINDOWS AND OPENINGS MEDIUM - LIGHT MA SONRY UNIT OR FAUX WOOD ELEMENT
23 GREEN ROOF LIFEROOF PRODUCT OR SIMILAR
24 CORBLE ACCENT PANEL SHERWIN WILLIAMS - CREAMY
25 CORBLE ACCENT PANEL SHERWIN WILLIAMS -TAWNY TAN
Page 21 of 230
2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570
© SKETCHWORKS ARCHITECTURE, LLC, 2024
LANGHUS ON MAIN
EXTERIOR MATERIALS
6 OF 8 DATE: 10/26/26
Page 22 of 230
2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570
© SKETCHWORKS ARCHITECTURE, LLC, 2024
LANGHUS ON MAIN
RENDERINGS
7 OF 8 DATE: 10/26/26
EXISTING TREES TO REMAIN ON SITE
Page 23 of 230
2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570
© SKETCHWORKS ARCHITECTURE, LLC, 2024
LANGHUS ON MAIN
RENDERINGS
8 OF 8 DATE: 10/26/26
Page 24 of 230
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 1
Langhús on Main
Mixed Use Residential/Commercial Development
Infill Project
220 East Main Street, Mount Horeb
September 30, 2026
On behalf of the Owner and Developer, Jeff Grundahl, please accept this revised submittal for a
proposed mixed-use residential development at 220 East Main Street, Mount Horeb, WI.
Project Team:
Developer:
Jeff Grundahl, (or assigns)
455 S Junction Road
Madison, WI 53719
608-237-1730
jeff@jgdevelopment.com
Architect:
Sketchworks Architecture, LLC
Steve Shulfer, AIA, Partner|CEO
2501 Parmenter Street, suite 300A
Middleton, WI 53562
608-836-7570
sshulfer@sketchworksarch.com
Surveyor & Civil Engineer:
Wyser Engineering
Wade Wyse P.E.
312 E Main Street
Mount Horeb, WI 53572
608-843-3388
wade.wyse@wyserengineering.com
Property Manager:
The Gallina Companies
Dawn Hendrickson
101 East Main Street, Suite 500
Mount Horeb, WI 53572
608-237-1300
dhendrickson@gallinacos.com
Traffic Analysis
TADI (Traffic Analysis & Design, Inc.)
Don Lee, PE
PO Box 128
Cedarburg, WI 53012
414.517.5014
dlee@tadi-us.com
Page 25 of 230
Sketchworks Architecture, LLC | 2250 Parmenter St, Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 2
Land / Parcels:
There are three parcels on Main Street, Mount Horeb that are in consideration for this project:
• 208 E Main Street (currently vacant)
o BOECK'S, CARL SURVEY & PLAT MT HOREB STATION PLAT OF BLK 1-11
BLOCK 6 LOTS 5, 6, 7 & 8
• 214 E Main Street (currently a small commercial property, formerly residential)
o BOECK'S, CARL SURVEY & PLAT OF MT HOREB STATION PLAT BLOCK 6
LOTS 9, 10 & 11
• 220 E Main Street (currently a small commercial property, formerly residential)
o BOECK'S, CARL SURVEY & PLAT MT HOREB STATION PLAT OF BLK 1-11
BLOCK 6 LOTS 12, 13 & 14
Property size:
253.4’ x 125.3’ +/- (regular) = 31,653 square feet (0.73 acres)
Property Zoned as:
DMU - Downtown Mixed Use
Page 26 of 230
Sketchworks Architecture, LLC | 2250 Parmenter St, Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 3
Current Zoning assessment and Development needs:
This project reflects the desired zoned use for the site and activates a previously under utilized
section of the downtown Main Street. Accessible commercial tenant spaces along the Main
Street frontage blend into the established cadence of buildings throughout the street.
Key building statistics include:
• Three stories, 40’ tall
• 28,392 sf footprint
• 9,507 sf commercial + 730 sf lobby
• 37,241 sf residential
• Amenity spaces:
o 2,315 sf tenant private secure storage (second floor)
o 1,134 sf fitness center (second floor)
o 564 sf tenant community room (third floor)
o 2,818 sf tenant community outdoor patio
• 42 units
• 54 parking stalls, internal to the building
• 1.28:1 ratio of stalls to units; 1.08:1 ratio of stalls to bedrooms
• 49 bicycle parking stalls (38 wall, 11 floor)
Page 27 of 230
Sketchworks Architecture, LLC | 2250 Parmenter St, Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 4
In 2026, the Langhus on Main project has been redesigned to accomidate the recently updated
Municipal Zoning Code for Mount Horeb and requires no provisons or alterations to the code.
Significant building attributes modified since the previous submittal:
• Modified elevations to accomidate new zoning requirements
o Vertical articulation requirements for south façade
▪ Visually appears as eight individual buildings and storefronts, with a
maximum forty-foot width for each vertical articulation
▪ Introduced gabled roofline on south façade, additional material changes
and changes in the roof line to break up the façade and add interest to
the building
o Material changes, colors, and window sizing throughout
• Increased commercial square footage
o 1/3 of total buidling depth totaling to 9,515 SF
• Decreased number of apartment units
o 42 total units, originally 66 units, (11/25 submittal ~ 44)
• Added resident storage to second and third floors as convenience to tenants
• Parking garage modified to meet new zoning requirements
• Three story maximum height
o Original submittal included 4 stories
• Height reduced to 40-feet to meet new zoning requirements
• Increased community shared space to meet new zoning requirements
• Second floor expanded to utilize entire building footprint to allow for the following:
o Indoor work out space
o Residential storage units
o Increased MEP area
o Third floor outdoor space for better access to natural light
• Indoor communitiy room with kitchen
• Outdoor community patio with access to community room
o Tenant patios seperated by landscape planters
• Third floor at west end stepped back to in response to neighboring building concerns
• East façade introduces gabled elements at pedestrian level to ease into the
neighborhoods north of the site
• Northeast corner scaled back for better transition to North neighbors.
Bringing this corner to life with residents and consumers will activate more businesses in the
heart of downtown without additional parking constraints. Bike storage in the building
encourages use of alternative transportation and use of extablished bike paths in the area.
The shared community spaces will encourage residents to get to know their neighbors
furthering the sense of a belonging in the community.
Page 28 of 230
Sketchworks Architecture, LLC | 2250 Parmenter St, Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 5
Southeast Corner at Main St. & Third St.
Community Patio Space
Page 29 of 230
Sketchworks Architecture, LLC | 2250 Parmenter St, Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 6
Summary of Zoning Code Regulations: (adopted March 2026)
Code / Section Assessment
Section 17.02.10 DMU Downtown Mixed-Use Zoning District MEETS CRITERIA
Section 17.03.03(2) Number of Principal Buildings per Lot MEETS CRITERIA
Section 17.03.03(4) Number of Land Uses per Building MEETS CRITERIA
Section 17.03.03(9) Site Plan Review Required MEETS CRITERIA
Section 17.03.03(10) Procedural Regulations MEETS CRITERIA
Section 17.03.03(11) Demolition of a Principal Structure MEETS CRITERIA
Section 17.03.05 Table of Land Uses SEE MIXED USE BUILDING
Section 17.03.06 Residential Land Uses DEFAULT TO MIXED USE CRITERIA
Section 17.03.08(2) Mixed-Use Building MEETS CRITERIA AS A MIXED USE BUILDING
Section 17.03.08(a) MEETS CRITERIA DENSITY AND BULK REQMNTS
Section 17.03.08(b)1 DOESN’T APPLY, THIS IS IN DMU DISTRICT
Section 17.03.08(b)2a
MEETS ALL CRITERIA – NO RESIDENTIAL W/IN
35% LOT DEPTH
Section 17.03.08(b)2b MEETS ALL CRITERIA – LOBBY FROM MAIN ST
Section 17.03.08(b)2c
MEETS ALL CRITERIA – EXCEEDS GROUND LEVEL
MINIMUM
Section 17.03.08(b)2d
MEETS ALL CRITERIA – PARKING NOT IN 30 FOOT
AND 35% LOT DEPTH
Section 17.03.08(d) MEETS ALL CRITERIA
Section 17.04.12 Bulk Dimensions MEETS CRITERIA
Section 17.04.20 Height Exceptions
MEETS CRITERIA – SCREENING PARAPET <5’
ABOVE ROOF, ROOF 40’ MAX.
Section 17.06.06 Parking MEETS CRITERIA – > 1.2 STALLS PER D.U.
Section 17.06.07 Loading DMU DISTRICT, LOADING ZONE ON THIRD STREET
Section 17.06.20 Lighting LIGHTING PLAN MEETS ZONING REQUIREMENTS
Section 17.06.43 Recreation Space
MEETS CRITERIA – RECREATION SPACE
PROVIDED, CLUBHOUSE & PATIO
Section 17.07.01 Exterior Building Design MEETS CRITERIA
Section 17.07.50 DMU Design Standards MEETS CRITERIA
Article VIII Landscaping Requirements EXEMPT FROM LANDSCAPING REQUIREMENTS
Page 30 of 230
Sketchworks Architecture, LLC | 2250 Parmenter St, Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 7
Allowable Property Use:
Section 17.02.10: Zoning Districts
(12) (DMU) Downtown Mixed-Use Zoning District
(a) Intent. This district is intended to permit downtown commercial and mixed-use
development at an intensity which provides significant incentives for infill development,
redevelopment, and the continued economic viability of existing development in a
downtown development pattern that is compatible with traditional “Main Street”
characteristics of Downtown Mount Horeb. Residential uses are intended to occur at a
density that can be accommodated within the bulk requirements of this zoning district.
ASSESSMENT: MEETS CRITERIA
Section 17.02.22: Historic Preservation Overlay Zoning District
(No map found in Zoning Code or online in Village GIS mapping.)
Section 17.03.03: Regulations Applicable to All Land Uses
(2) Number of Principal Buildings per Lot
(b) …a maximum of one principal building shall be permitted on any one lot…
ASSESSMENT: MEETS CRITERIA
(4) Number of Land Uses per Building. Any number of land uses that are permitted by right can
be combined within a building or on a given lot, per the limitations of those individual uses. Any
number of land uses that require a conditional use permit can be combined within a building or
on a given lot, per the limitations of those individual uses and with each approved through the
conditional use process (Section 17.10.32).
ASSESSMENT: MEETS CRITERIA
(9) Site Plan Review Required. All development involving physical modifications to a site
including but not limited to new developments, building additions, alterations, or removal; and
additions to paving are subject to site plan review and approval in accordance with Section
17.10.43 of this Chapter, except for single family and two-family dwelling units in any zoning
district. The establishment of a Pocket Neighborhood land use requires Site Plan approval.
ASSESSMENT: MEETS CRITERIA
(10) Procedural Regulations and Requirements. All land use and development of land shall
comply with all requirements of Article X, pertaining to the procedures necessary to secure
review and approval of land use and development. Such regulations and restrictions address
Page 31 of 230
Sketchworks Architecture, LLC | 2250 Parmenter St, Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 8
both procedural and technical requirements.
ASSESSMENT: MEETS CRITERIA
(11) Demolition of a Principal Structure. Where a principal structure has been removed, all
driveways, paved areas, and below grade improvements on the lot shall be removed. All public
utilities shall be abandoned at their connection with the main unless written exception is
obtained from the Village Engineer. All demolition activities shall be in accordance with the
Village of Mount Horeb Municipal Code and all State and Federal regulations. Asbestos
abatement and removal of any other hazardous materials, when required, must be documented
before any demolition activity takes place. Applicant shall provide building inspector proof of
liability insurance. Proof of proper abandonment of all utilities and proof of notification of police
and public works as required. Applicant shall notify diggers hotline (dial 811) prior to
commencing any scraping, excavating, or boring.
ASSESSMENT: MEETS CRITERIA
Section 17.03.05: Table of Land Uses:
Downtown Mixed Use (DMU):
Permitted Uses: (only those relevant to this project are listed below)
Live/Work Unit
Mixed Use Building
Artisan Production Shop
Bed and Breakfast
Commercial Indoor Lodging
Commercial Kitchen
Indoor Commercial Entertainment
Indoor Maintenance Service
Indoor Sales of Services
Office
Personal or Professional Service
Communications Antenna
Electric Vehicle Charging
Home Occupation
Incidental Indoor Sales
Incidental Light Industrial
Incidental Outdoor Display and
Sales
On-Site Parking Lot
On-Site Structured Parking
Personal Antenna and Towers
Satellite Dish
Short-Term Residential Rental
Small Solar Energy System
Arbor/Trellis
Awning Canopy
Bay Window/Balcony
Eves dn Gutters
Fire Escape
Flagpole
Fountain
Garden, Residential Composting,
Raised Garden Bed, Landscape
Area, Rain Garden, or Bioswale
Mechanical Equipment
Patio/Freestanding or Detached
Deck
Refuse Enclosure
Walkway/Steps
Page 32 of 230
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 9
ASSESSMENT: SEE MIXED USE BUILDING
Section 17.03.06: Residential Land Uses
(1) Apartment/Multiplex: This dwelling unit type consists of a single structure with three or more
individual attached dwelling units.
ASSESSMENT: DEFAULT TO MIXED USE CRITERIA
Section 17.03.08: Mixed-Use Buildings
(2) Mixed-Use Building: A building containing a mix of principal nonresidential land uses and
principal residential land uses.
ASSESSMENT: MEETS CRITERIA AS A MIXED USE BUILDING
Regulations:
(a) Both uses are subject to the density, intensity, and bulk requirements of Article II.
ASSESSMENT: MEETS CRITERIA OF DENSITY AND ALL BULK REQUIREMENTS
(b) Land Use Minimums.
1. For any lot not located within the Downtown Mixed-Use District, …
ASSESSMENT: DOESN’T APPLY, THIS IS IN DMU DISTRICT
2. For any lot located within the Downtown Mixed-Use District, no residential land uses
are permitted on the ground floor unless such use is located a minimum of 30 feet or
35% of the lot depth as measured from the street right-of-way lot line directly abutting
Main Street, Front Street, South First Street, and South Second Street, whichever is
greater, as determined by the Plan Commission. See Figure 17.03.08b below.
a. Lots with multiple street frontages.
i. The minimum 30 foot or 35% lot depth requirement shall not be
required along any property line directly abutting a public or
private alleyway.
ASSESSMENT: MEETS ALL CRITERIA – NO RESIDENTIAL W/IN 35% LOT DEPTH
b. The lobby or entryway spaces intended for use by both residential and
nonresidential land uses shall be permitted within the 30 foot or 35% lot depth
requirement above.
ASSESSMENT: MEETS ALL CRITERIA – LOBBY FROM MAIN ST
c. Nonresidential land uses are permitted to exceed ground level minimums and
be located on any floor of the structure so long as the ground level minimum
requirement is met.
Page 33 of 230
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 10
ASSESSMENT: MEETS ALL CRITERIA – EXCEEDS GROUND LEVEL MINIMUM
d. For avoidance of doubt, parking is prohibited in the areas identified as
requiring nonresidential land uses.
ASSESSMENT: MEETS ALL CRITERIA – PARKING NOT IN 30 FOOT AND 35% LOT DEPTH
(c) Minimum and maximum required parking: See Section 17.06.06. (and shown below)
(d) Mixed-Use Buildings shall comply with the design standards for commercial and mixed-use
land uses. See Section 17.07.30. See Section 17.06.43 for on-site recreation space
requirements.
ASSESSMENT: MEETS ALL CRITERIA
Section 17.04.12 Table of Bulk Dimensions – Mixed Use Zoning Districts
Maximum Impervious Surface Percentage 100%
ASSESSMENT: MEETS CRITERIA
Maximum Lot Dwelling Unit Density None
ASSESSMENT: MEETS CRITERIA
Minimum Lot Area None
ASSESSMENT: MEETS CRITERIA
Minimum Lot Width None
ASSESSMENT: MEETS CRITERIA
Minimum Lot Frontage at Right of Way None
ASSESSMENT: MEETS CRITERIA
Minimum Front Yard and Street Side Corner Setback Min: 0 ft , Max: 10 ft
ASSESSMENT: MEETS CRITERIA
Minimum Side Yard Setback – Interior Min: 0 ft , Max: 10 ft
ASSESSMENT: MEETS CRITERIA
Minimum Rear Yard Min: 0 ft , Max: 10 ft
ASSESSMENT: MEETS CRITERIA
Maximum Building Height Max: 40 ft and 3 stories
(note 5’ added parapet and mechanical screening allowances)
ASSESSMENT: MEETS CRITERIA (3 stories, <40 ft, plus screening parapet)
Minimum Building Separation (same lot) See Building Code
ASSESSMENT: DOESN’T APPLY
Minimum Principal Dwelling Unit Structure Area See Building Code
ASSESSMENT: MEETS CRITERIA
Page 34 of 230
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 11
Minimum Front-Loaded Garage Setback Even w/ or behind principal Building
ASSESSMENT: MEETS CRITERIA
Minimum Pavement Setbacks 0 ft
ASSESSMENT: MEETS CRITERIA
Section 17.04.20: Exceptions to Maximum Height Regulations
(1) Minor Projections. The following are permitted to exceed the maximum height regulations
within any district where permitted: (text omitted that doesn’t apply)... The provisions of this
Chapter shall not apply to prevent the erection above the building height limit of a
parapet wall or cornice for ornament (and without windows) extending above such height
limit not more than 5 feet. Such features, however, shall be erected only to such height
as is necessary to accomplish the purpose they are to serve and subject to the
Wisconsin state building code.
(2) Additional Height for Roof Design or Non-Residential Space on the Ground Level. An
Apartment/Multiplex, Townhouse, Live/Work, or Mixed-Use Building may exceed the maximum
height regulations by up to a total of six (6) feet within any district where the land use is
permitted, if either of the following conditions is met:
(a) The structure is designed with a gable, hip, or gambrel roof with a pitch of at least
6/12.
(b) A Mixed-Use Building may increase the floor-to-ceiling height of the ground level, but
then the building is not eligible for additional height for roof design.
ASSESSMENT: MEETS CRITERIA – SCREENING PARAPET EXTENDS <5’ ABOVE ROOF
Parking requirements:
Section 17.06.06
Per “DMU, Downtown Mixed USe”:
Mixed Use: All Land Uses Per the minimum of each individual
land use
DMU Zoning
Land uses other than Residential None
Residential Land Uses 1.2 per dwelling unit
ASSESSMENT: MEETS CRITERIA – > 1.2 STALLS PER DWELLING UNIT
PARKING DIMENSIONAL STANDARDS MEET VILLAGE CRITERIA
Section 17.06.07: Off-Street Loading Standards
ASSESSMENT: DMU DISTRICT, LOADING ZONE ON THIRD STREET
Section 17.06.20: Exterior Lighting Standards
ASSESSMENT: LIGHTING PLAN MEETS ZONING REQUIREMENTS
Section 17.06.43: On-Site Recreational Space Requirements
Page 35 of 230
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 12
(1) On-Site Recreational Space Requirements for Multi-Family and Mixed-Use Land Uses.
(a) Each multi-family or mixed-use development containing 3 or more dwelling units shall
provide on-site recreational space suitable for inside or outside gathering space or
recreation. This space could include a children’s play area, outdoor gazebo or sitting
area, indoor gathering/community spaces, indoor fitness center, and/or shared outdoor
porch, balcony, or rooftop terrace. On-site recreational space may be provided at ground
level, in the building, or other areas including but not limited to communal
porches/decks, balconies, and rooftops.
(b) Minimum Area. A minimum of 200 square feet per building plus 25 square feet per
bedroom of usable recreation space shall be provided.
(c) Required on-site recreational space shall be for the private use of residents and need
not be open to the public.
(2) Required on-site recreational space may be divided into multiple distinct spaces, provided
that no single space is smaller than 100 square feet or narrower than 10 feet in any direction.
(3) The following will not count towards meeting the on-site recreational requirement:
(a) Outdoor areas in the required front yard or street side yard setbacks.
(b) Outdoor areas used for on-site parking or traffic circulation.
(c) Outdoor or indoor areas used for landscaping, stormwater infiltration, bicycle parking,
trash and recycling storage, or mechanical equipment.
(4) Required on-site recreational space shall not count toward land dedication or fee in lieu of
land dedication requirements of Village of Mount Horeb Ordinance Fee Schedule.
ASSESSMENT: MEETS CRITERIA – RECREATION SPACE PROVIDED, CLUBHOUSE &
PATIO
ARTICLE VII: EXTERIOR BUILDING DESIGN STANDARDS
Section 17.07.01: Purpose and Applicability
(1) Purpose. The purpose of this Section is to regulate the design and materials used for the
exterior of buildings and structures within the Village so as to maintain and enhance the
attractiveness and values of property in the community. This Article is further intended to
support the creation of a pedestrian-oriented urban environment that emphasizes architectural
and urban design principles of human scale and visual interest. Additionally, this Article is
intended to ensure the development of structures that maintain a long-lasting appearance;
withstand the effects of time and exposure to the elements; resist damage in areas with high
vehicular and pedestrian traffic and in areas where larger equipment that could cause damage
is commonly used; that maintain a consistent character of development based on land use and
zoning district particular to each development; and that contribute to the long-term economic
and social vitality of the Village of Mount Horeb.
(2) Applicability. Telecommunication, Extraction and Disposal, Energy Production, and
Agricultural land uses are exempt from the exterior design standards in Sections 17.07.10 to
17.07.50 below.
Page 36 of 230
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 13
(a) New Construction. The
requirements of this Section shall apply to all structures and buildings within the Village
constructed after the effective date of this Chapter.
(b) Additions. (omitted, doesn’t apply)
(c) Alterations. (omitted, doesn’t apply)
(d) Exceptions and Appeals.
1. Exceptions. Exceptions to the building design standards set forth in this
Section may be granted by the Zoning Administrator, to permit substitute building
materials or construction of comparable quality or design when it can be
demonstrated that the provisions of this Section are infeasible and that the
granting of such exception is in keeping with the purpose of this Section.
Decisions rendered by the Zoning Administrator may be appealed to the Plan
Commission.
2. Appeals. Any person affected by a decision of the Zoning Administrator may
petition for a hearing before the Plan Commission.
3. Waivers. The Plan Commission is authorized to grant one or more waivers for
specific design requirements in this Section when the Plan Commission finds the
design to constitute an exemption as described above in subsection (1) or finds
an alternative design standard also achieves the Purpose of this Section.
a. Granting of waivers by the Plan Commission shall be identified within
the conditions of approval as part of the design review component of any
Site Plan review (Section 17.10.43).
(e) Beyond the rules in this Section, additional building design standards may apply to:
1. Conditional Use Permits (see Section 17.10.32)
2. Planned Unit Development Districts (see Section 17.0.2.11)
(3) Review and Approval. Through the site plan review and building permit processes, the
Zoning Administrator shall be responsible and have authority to hear, review, and act upon all
proposed exterior architectural plans for all proposed development.
(4) Exterior Building Materials. The 4 classes of building materials referenced in this Chapter
have the following meanings:
(a) Class I materials include brick, brick veneer, stone, stone veneer, and glass
curtain/storefront).
(b) Class II materials include split face or decorative block, and stucco.
(c) Class III materials include architectural/decorative metal panels, EIFS, residential
aluminum siding, and siding made of wood, wood composite, vinyl, or fiber cement.
(d) Class IV materials include smooth face or non-decorative block; concrete panels (tilt-
up or precast); asphaltic, fiberglass, metal, or poly-roofing siding; non-decorative metal
panels; corrugated metal; and plywood, chipboard, or other non-decorative wood. Also
includes any material not listed in (a) through (c) above.
Any Exterior Change Within the Downtown Mixed Use Zoning District - See Section 17.07.50
ASSESSMENT: MEETS CRITERIA
Page 37 of 230
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 14
Section 17.07.50: DMU Zoning District Design Standards
These standards apply to any land use, building, and structure within the Downtown Mixed Use
zoning district constructed or altered after the effective date of this Chapter.
(2) Applicability. The regulations of this Section shall apply to new development and changes to
the exterior of any building within the mapped boundaries of the Downtown Mixed Use zoning
district.
(4) Design Theme: The design theme for the Downtown Mixed Use Zoning District is based on
its historical, pedestrian-oriented development pattern that incorporates retail, residential, and
institutional uses. Building orientation and character includes minimum setbacks at the edge of
the sidewalk, use of alleys for access (if possible), and on-street or other off-site parking. The
design theme is characterized by a variety of architectural styles popular at the time, including
Italianate, Romanesque, and Neoclassical, in formats with office, storage, or residential located
over commercial. The façades of these buildings have a traditional main street storefront
appearance that can vary in scale depending on location and surroundings, have street yard
and side yard setbacks of zero feet, have prominent horizontal and vertical patterns formed by
regularly spaced window and door openings, detailed cornice designs, rich detailing in masonry
coursing, window detailing and ornamentation, and are predominately brick, stone, or wood.
Exterior building materials are of high quality. Exterior appurtenances are minimal. Exterior
colors are harmonious, simple, and muted. Exterior signage blends, rather than contrasts, with
buildings in terms of coloring (complementary to building), location (on-building), size (small),
and number (few).
ASSESSMENT: MEETS CRITERIA
(5) Design Standards for Project Review (New Construction, Building Additions, and Building
Alterations).
(a) The design standards contained in this Subsection shall apply to all changes meeting
the criteria for Project Review (including all new buildings, building additions, and new
building appurtenances). Such activities shall correspond to the following:
1. The following requirements for building setback; height; building mass;
horizontal rhythms (created by the placement and design of façade openings and
related elements such as piers, columns); vertical rhythms (created by the
placement and design of façade details such as sills, transoms, cornices and
sign bands); roof forms; exterior materials; exterior surface features and
appurtenances; exterior colors; exterior signage; on-site landscaping; exterior
lighting; parking and loading area design; and the use of screening.
(b) Building Setback. Throughout the district, the setback of buildings from street yard
and side yard property lines shall conform to the design theme described in Subsection
(4) above, as determined by the Plan Commission.
1. No parking areas shall be located along any street frontage within the DMU
district, unless an exception is granted through the conditional use process
(Section 17.10.32).
ASSESSMENT: MEETS CRITERIA OF ZONING BULK REQUIREMENTS. PARKING AT
NORTH SIDE IS CONCEALED WITHIN BUILDING.
Page 38 of 230
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 15
(c) Building Height.
1. See Sections 17.04.11 to 17.04.14 for zoning district maximum height
requirements.
ASSESSMENT: MEETS CRITERIA
(d) Building Mass.
1. Throughout the district, the massing of buildings may vary depending on
location and surrounds, but shall conform to the design theme described in
Subsection (4) above, as determined by the Plan Commission.
2. The characteristic proportion (relationship between façade height and width) of
the design theme shall be maintained.
3. Building mass for large structures (with a façade area exceeding 5,000 square
feet) shall integrate façade articulations to conform to the design theme
described in Subsection (4), as determined by the Plan Commission.
ASSESSMENT: MEETS CRITERIA
(e) Façade Articulation. As determined by the Plan Commission, façade lengths shall not
be greater than 40 feet without articulation such as:
1. Recesses or projections that step back or project a portion of the main façade
plane.
2. Recesses or projections of upper floors from the ground floor façade plane.
3. Vertical division using different textures or materials.
4. Division of the façade into individual units through the use of windows,
entrances, arcades, porches, decks, balconies, lighting, or the incorporation of
traditional storefront design along the ground floor per Section 17.07.50(6)(e).
5. Roof form variation such as the inclusion of dormers, change in roof lines, or
change in roof type.
6. Public art installations located directly on a facade, such as murals (See
Chapter 12.075 of the Village of Mount Horeb Municipal Code for public art
standards).
ASSESSMENT: MEETS CRITERIA
(f) Horizontal Rhythms. The horizontal pattern of exterior building elements formed by
patterns of building openings for windows and doors, and related elements such as piers
and columns shall be spaced at regular intervals across all visible façades of the
building, and shall conform to the design theme described in Subsection (4) above, as
determined by the Plan Commission.
ASSESSMENT: MEETS CRITERIA
(g) Vertical Rhythms. The floor heights shall conform to the minimum and maximum
height
requirements of the DMU zoning district (Section 17.04.12). The rhythm of the ground
floor
shall harmonize with the rhythm of upper floors. The vertical pattern of exterior building
elements formed by patterns of building openings for windows and doors, and related
elements such as sills, headers, transoms, cornices and sign bands shall conform to the
design theme described in Subsection (4) above, as determined by the Plan
Commission.
Page 39 of 230
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 16
ASSESSMENT: MEETS CRITERIA
(h) Roof Forms. Flat or gently sloping roofs which are not visible from the street shall be
used.
Mansards or other exotic roof shapes not characteristic of the design theme described in
Subsection (4) above, as determined by the Plan Commission, shall not be used. See
Figure
17.07.50b.
ASSESSMENT: MEETS CRITERIA
(i) Exterior Materials. Selected building materials conform to the design theme described
in Subsection (4) above, a determined by the Plan Commission.
1. Masonry. Stone or brick facing shall be of even coloration and consistent size.
Cinder block, concrete block, concrete slab, or concrete panel shall not be
permitted.
2. Siding.
a. Wood, fiber cement, textured metal clapboard siding, or an alternative
appropriate high-quality siding material may be appropriate, particularly if
the proposed non-masonry exterior was used on a building which
conforms to the design theme described in Subsection (4) above, as
determined by the Plan Commission.
b. Clapboard or board and batten may be appropriate in certain instances
where used on the existing structure within the same block-face which
conforms to the design theme described in Subsection (4) above, as
determined by the Plan Commission.
c. Class IV materials are prohibited.
ASSESSMENT: MEETS CRITERIA
3. Glazing. Clear, or slightly tinted glass or related glazing material shall be used.
Mirrored glass, smoked glass, or heavily tinted glass shall not be permitted,
unless needed in a special situation as determined by the Plan Commission.
ASSESSMENT: MEETS CRITERIA
4. Colors. Pain colors used on exterior materials shall reflect the building’s era of
original construction, target era of restoration/renovation, and/or era of historical
significance. Applicants may choose their paint color choice within one of these
contexts. New construction paint colors should complement surrounding
structures.
a. Period-appropriate color palette examples include the Sherwin
Williams historic exterior collections.
ASSESSMENT: MEETS CRITERIA
(j) Exterior Surface. Exterior surface appurtenances shall conform to the design theme
described in Subsection (4) above, as determined by the Plan Commission.
1. The traditional storefront design theme (characterized by strong horizontal and
vertical rhythms formed by building openings, windows, and transom windows)
shall be employed for all new nonresidential buildings.
Page 40 of 230
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 17
2. Throughout the district,
avoid cluttering building façades with brackets, wiring, meter boxes, antennae,
gutters, downspouts and other appurtenances. Unnecessary signs shall also be
avoided. Where necessary, such features shall be colored so as to blend in,
rather than contrast, with the immediately adjacent building exterior. Extraneous
ornamentation which is inconsistent with the design theme described in
Subsection (4) above, as determined by the Plan Commission, is also prohibited.
ASSESSMENT: MEETS CRITERIA
(k) Awnings and Marquees. Awning and marquee size, color and placement shall
complement the architectural character of the building, as determined by the Plan
Commission.
1. Soft, weather-treated canvas or vinyl materials which allow for flexible or fixed
installation shall be used for awnings.
2. Aluminum or suspended metal canopies shall be permitted.
3. Signage applied to awnings shall be simple and durable.
4. Backlit awnings are prohibited.
ASSESSMENT: MEETS CRITERIA
(l) Exterior Lighting. On-building exterior lighting shall be compatible and harmonious
with the
design theme described in Subsection (4) above and Section 17.06.20, as determined
by the Plan Commission.
1. On-Building Lighting. The design, color, height, location, and light quality of all
on-building light fixtures shall be consistent for all light fixtures.
2. Ground-Mounted Lighting. The design, color, height, location and light quality
of ground-mounted lighting shall be consistent with the design theme described
in Subsection (4) above, as determined by the Plan Commission.
ASSESSMENT: MEETS CRITERIA
(m) Signage. See Article IX for all signage requirements.
ASSESSMENT: SIGNAGE TO BE SUBMITED AT A LATER DATE BY TENANTS
(n) Cleaning. Structural components and exterior materials shall be cleaned when
necessary, and with only the gentlest possible methods.
1. Low-pressure water, steam cleaning, and soft natural bristle brushes are
permitted.
2. Sandblasting and power washing (more than 400 psi) are prohibited.
3. Other methods shall be pre-approved by the Plan Commission.
(6) Design Standards for Design Alteration Review and Renovation Review (Changes to the
Exterior
Appearance of a Property). (OMMITTED, NOT APPLICABLE TO NEW BUILDING)
Page 41 of 230
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 18
ARTICLE VIII: LANDSCAPING REQUIREMENTS
Section 17.08.01: Purpose
The purpose of this Article is to establish landscaping requirements and other regulations
intended to preserve and maintain vegetation within in a manner that promotes the natural
resource protection, aesthetic, and public health goals of the Village.
Section 17.08.10: Applicability
(5) Exemptions.
(b) All land uses in the Downtown Mixed-Use District, Parks and Recreation
District, and Conservancy District are exempt from all landscaping requirements.
ASSESSMENT: EXEMPT FROM LANDSCAPING REQUIREMENTS
STORMWATER MANAGEMENT
Redevelopment site, compliant with Village and County requirements.
Page 42 of 230
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 19
Parking
The parking accommodations will include 54 total parking spaces on site. All of the stalls will be
at grade, secure, indoor parking, accessed from Third Street and will now exit only to alleyway
at the north in order to drive traffic to the stoplight. These will be reserved for residents and
business tenants of the building.
Parking Ratios:
• 54 parking stalls, internal to the building
• 1.28:1 ratio of stalls to units; 1.08:1 ratio of stalls to bedrooms
• 49 bicycle parking stalls (38 wall, 11 floor)
Refuse
A refuse room internal to the building will be provided to conceal trash and recycling dumpsters.
Access for removal will be provided at Third Street / the East end of the building.
Amenity Space
The tenants will have access to building amenities including: clubhouse, outdoor rooftop patio,
fitness room, conference room. The total areas of which are compliant with Village Code.
Outdoor Space
There will be a tenant rooftop patio amenity and clubhouse on the third floor. Private outdoor
balconies are provided for each dwelling unit. These balconies are either mounted tot eh exterior
wall, or recessed - refer to the building plans and elevations.
The first floor corner commercial space is intended to have outdoor seating, potentially for dining
use.
Page 43 of 230
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 20
Exterior Design
The goal of the development aesthetic is to compliment the historic Main Street appeal of Mount
Horeb. The materials used will be a combination of quality masonry (brick and stone), storefront
glazing and composite wood siding. Colors will be selected to complement the streetscape in
neutral, timeless, tones.
Exterior design features include:
• Vertical articulation is provided at a maximum of forty-foot spacing as required by
Village code
• The building is stepped back in areas at the upper floors to reduce the visual scale.
• Parking is concealed, in lieu of exposed surface parking
• A combination of brick, stone, and wood is used to vary the elevation and provide the
‘infill’ appearance common to most historic villages
• Landscape and decorative lighting will be used to enhance the aesthetic and experience.
• Outdoor spaces have been provided to activate the Main Street presence and provide for
tenant amenities
• Detail elements common to Mount Horeb are being introduced, such as recessed
balconies, large storefront windows, a combination of fabric and structured canopies,
brick pilasters, and wood sign-bands. All of these are found in historical context within
the Village of Mount Horeb.
The building height is three stories, and 40-feet. Additionally, the topography of the site slopes
nearly eight feet from south to north, creating a challenge for any building development.
Measured from grade, the exterior walls are approximately 32’ tall on the north side, and
typically a maximum of only 36 feet in height when measured along any grade at any side.
The building third-floor is stepped back at the North side for the outdoor patio amenity. It is also
stepped back at the West side to create spacing from the Mount Horeb Telephone Company.
The building section in the attached drawings illustrates the relative height relationships to Main
Street, the North alley, and refence points to the historic opera house building. It should be
noted that this proposed development is now shorter in height relative to the opera house, and
approximately the same height as the Village Hall.
Multiple elevations and renderings of the intended design are provided & attached. Materials
and colors are shown approximate and called out on the elevations.
Page 44 of 230
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 21
Stormwater Management
The redevelopment consideration of this property will not trigger a stormwater management
plan. Rainwater collected from hardscape and rooves will be directed to the Village stormwater
infrastructure.
There will be placement of rooftop stormwater retention trays to reduce runoff.
Utility Infrastructure Assessment
Initial discussions with Village staff and utility stakeholders have not produced any concern for
the development. Adequate supply for all utilities appears to be available, and the future design
submissions will accurately describe and design the necessary development infrastructure.
Traffic
A Traffic Impact Analysis (TIA) has been performed by Traffic Analysis and Design (TADI) of
Cedarburg, WI. A draft of the TIA report, dated August 14, 2025, has been forward separately
to Village Staff. This report indicates only a modest impact to the adjacent streets as caused by
this development.
Further, we have modified the indoor parking structure and interior traffic flow such that the 3rd
street will be “entrance only” and the NW corner will be “exit only”. This will then send traffic
directly to the 2nd street stoplight.
It will be up to the village to determine if the alley should be one way or two way traffic. The
developer is ok with either choice.
We are suggesting that the third street parking that exists today adjacent the building, be
modified such that it is for short term “Delivery parking” only. This will dedicate spots for retail
commercial deliveries and prevent long term parking near the intersection.
Gallina company additional studied the inflow/exit of two of their properties during the exact
same peak times the traffic analysis was done – results have been communicated previously.
• Hoff Mt Horeb, WI – 48 units
• LeSilve Middleton, WI – 180 units
Page 45 of 230
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 22
Adherence to the Comprehensive Plan
There are several objectives that the 2022 Comprehensive Plan (with amendments) seeks to
achieve. The following are examples of how this development
Foster New Housing Options:
• Provide a variety of housing types, densities, arrangements and costs to accommodate
the needs, desires and life cycles of existing and future residents.
o This proposed development will bring over forty new units of apartments within
Mount Horeb’s urban district.
• Increase the amount, type, and availability of affordable and workforce housing options
in the Village.
o While these units will be considered ‘market rate’, they provide a housing option
for those that may not wish to, or be able to, afford the single-family housing
ownership.
Grow the Local Economy:
• Strengthen and diversify the non-residential tax base and employment opportunities to
serve the day-to-day needs of residents.
• By adding commercial space and residential housing alike on underperforming real
estate, the downtown tax base will be improved, and there will be an improved means to
attract and retain businesses that enhance Mount Horeb’s desired character and
appearance.
o This development will enhance the downtown character and business climate
through new development of properties that have exceeded their lifespan.
• Cultivate independent small businesses and entrepreneurship opportunities in the
Village, especially in and around downtown.
o This development provides both housing and leasable commercial space for
small business and is vital to the livelihood of Main Street.
Page 46 of 230
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 23
An excerpt from the Comprehensive Plan
(Chapter Six: Land Use, page 43) supports the exact type of development our team is
proposing:
Central Mixed Use
This future land use category is intended for pedestrian-oriented commercial, office,
community facility, and upper story residential uses in a “downtown” setting, with on-
street parking and minimal building setbacks. The Central Mixed-Use land use category
includes the historic downtown area. The existing Village zoning district that is most
appropriate to implement this future land use category is the Central Business District
(CB).
• Policies and Programs:
1. Continue to implement the recommendations of the Downtown
Redevelopment Plan.
2. Promote downtown as a tourist, commercial, civic, and social center.
3. Work with downtown property owners and businesses to preserve,
renovate, modernize, and put to active use historically significant buildings.
4. Support the expansion, retention, and upgrading of specialty retail,
restaurants, financial services, offices, neighborhood retail and services, and
community uses.
5. Require that all projects submit and have approved detailed building
elevations and site plans, showing the proposed locations of the building(s),
parking, storage, loading, signage, landscaping, and lighting prior to
development approval.
6. Protect the unique quality of downtown by requiring buildings to be at least
two stories with a zero-lot line front setback.
7. Promote truly mixed-use development with residential above the first floor
and design oriented to pedestrian and not automobiles.
The Comprehensive Plan discusses a desire to create housing diversity for empty-nesters,
young professionals, and new families, the project’s target demographic. This same plan seeks
to “Foster Redevelopment, Reinvestment, and (promote) New Development”.
“Environmental Sustainability and Stewardship” is also a stated goal of the Plan. By creating
more density in this pedestrian friendly location, the impact to utility services, sprawling land
use, environmental pollutants, and needless consumption of natural habitat is minimized.
Simply put, this type of development, with this type of density, is smart.
We believe this well-placed mixed use development not only reinforces the downtown Main
Street corridor, it extends the useable area by nearly ¾ of a block, Lastly, it aids in reducing
urban sprawl through a smart, dense, and walkable land use.
Page 47 of 230
Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com
LANGUS ON MAIN
MOUNT HOREB – MAIN ST MIXED USE BLDG
September 30, 2026
Page 24
Conclusion
Community engagement on this project has been incredible, and the developer has gone great
lengths to address and mitigate every concern brought forth.
We firmly believe that this mixed-use infill development should be approved as it strengthens
the heart of downtown and Main Street, and positions the community for long-term vitality. So
many community’s downtowns die for lack of attention to their main street business districts:
lack of business, lack of walkability (a condition of sprawl), and lack of residential density
downtown. This project resolves all of these risks by bringing daily activity to the village center,
supporting local businesses and creating a walkable, engaging environment – a huge economic
and benefit, particularly when compared to the current land use (vacant lot, two old converted
retail buildings).
In addition to the enhanced and diversified tax base, this project ensures that Main Street
remains vibrant and economically resilient for decades to come. It is an investment in Mount
Horeb’s future character, livability, and sustained success!
Our team has been working tirelessly to accommodate Village feedback while ensuring a viable
project. We thank you for your consideration of this exciting development in Mount Horeb, we
look forward to continued discussion and collaboration!
Respectfully submitted
Steve Shulfer, AIA
Sketchworks Architecture, LLC
Page 48 of 230
Page 49 of 230
Page 50 of 230
Page 51 of 230
Page 52 of 230
Page 53 of 230
Page 54 of 230
Page 55 of 230
P.O. Box 128
Cedarburg, WI 53012
800.605.3091
www.tadi-us.com
Main Street
Residential/Mixed-Use
Development
Traffic Impact Analysis
Village of Mt Horeb
Dane County, Wisconsin
September 22, 2025
Page 56 of 230
TADI
Phone: 800.605.3091 PO Box 128 www.tadi-us.com
Cedarburg, WI 53012
PROVIDING TRAFFIC ENGINEERING SOLUTIONS
TRAFFIC IMPACT ANALYSIS
DATE: September 22, 2025
TO: Jeff Grundahl
214 E. Main LLC
FROM: Don Lee, P.E.
John A Bieberitz, P.E., PTOE
Traffic Analysis & Design, Inc.
SUBJECT: Main Street Residential/Mixed-Use Development
214-220 E. Main Street
Village of Mt. Horeb, Dane County, WI
INTRODUCTION
A residential/mixed-use development is being proposed to be located on the north side of Main
Street/State Trunk Highway (STH) 78 between North 2nd Street and North 3rd Street in the
Village of Mt. Horeb, Dane County, Wisconsin (Exhibit 1). Access to the site is proposed via
two full access driveway connections: one onto North 3rd Street and one onto the adjacent
residential alley located immediately north of the proposed building (Exhibit 2A). This traffic
impact analysis (TIA) report was prepared to address the weekday morning and weekday
evening peak hour traffic impacts of the proposed development traffic on the adjacent
transportation system.
STUDY AREA
Study Intersections
The study area for this TIA includes the following existing and proposed intersections:
• Main Street with North 2nd Street (traffic signal control)
• Main Street with North 3rd Street (two-way stop control)
• North 2nd Street with Alley (two-way stop control)
• Alley with Proposed North Access Driveway (one-way stop control)
• North 3rd Street with Proposed East Access Driveway (one-way stop control)
Each intersection is shown on the study area map on Exhibit 1 and the site plan on Exhibit 2A. A
transportation detail illustrating existing intersection lane configurations and speed limits is
shown in Exhibit 3.
Study Area Roadways
Main Street is a two-lane undivided east/west principal arterial with a posted speed limit of 25
miles per hour (mph). According to WisDOT, the Year 2024 annual average daily traffic
Page 57 of 230
Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin
Page 2 of 11
September 22, 2025
volumes (AADTs) on Main Street were approximately 8,900 vehicles per day (vpd) immediately
west of North 2nd Street, 10,000-vpd to the west of North 3rd Street and 9,100-vpd (2025 count)
to the east of North 3rd Street. Sidewalks and parallel parking are currently provided along both
sides of Main Street within the limits of the study area.
2nd Street is a two-lane undivided major collector with a posted speed limit of 25-mph. The Year
2022 WisDOT AADT volumes on 2nd Street were 1,300-vpd immediately south of Main Street.
No WisDOT AADT is currently available to the north; however, ADT volumes of approximately
900-vpd were interpolated from six hours of peak period turning movement counts taken as part
of this study. Sidewalks and parallel parking are currently provided along both sides of North 2nd
Street, immediately north of Main Street. Sidewalks are also currently provided along both sides
of South 2nd Street, immediately south of Main Street and angle parking is provided along only
the west side of the street to the south of Main Street.
3rd Street is a two-lane undivided major collector with a posted speed limit of 25-mph. The Year
2022 WisDOT AADT volumes on 3rd Street were 400-vpd immediately south of Main Street. No
WisDOT AADT is currently available to the north; however, ADT volumes of approximately
300-vpd were interpolated from six hours of peak period turning movement counts taken as part
of this study. Sidewalks are currently provided along both sides of 3rd Street, immediately north
of Main Street and parallel parking is provided along only the west side of the street to the north
of Main Street. Sidewalks and parallel parking are also currently provided along only the west
side of South 3rd Street, immediately south of Main Street.
DATA COLLECTION
Existing Traffic Counts
Weekday morning (6:00 to 9:00 a.m.) and weekday evening (3:00 to 6:00 p.m.) turning
movement traffic counts were conducted by TADI in early August of 2025 at the 2nd Street
intersections with Main Street and the north alley and with the 3rd Street intersection with Main
Street.
Based on the turning movement traffic counts, the peak traffic hours at the study intersections
were determined to occur from 7:15-8:15 a.m. (AM peak hour) and from 4:15-5:15 p.m. (PM
peak hour). The traffic volume counts were compiled for these peak hours and are shown on
Exhibit 4 as the “Existing Traffic Volumes”. The full traffic count data collected for this study,
showing calculated peak hour factors and percentage of heavy trucks, is included in Appendix A.
In addition, a Wavetronix radar counter was placed along the north alley between North 2nd
Street and North 3rd Street to record the existing hourly and daily volumes along the alley. The
count was conducted in early August of 2025. The counters recorded data from midday on
Tuesday, August 5th through midday on Thursday, August 7th. The output for the counter has
also been included in Appendix A. Based on the count, the ADT along the Alley between 2nd
Street and 3rd Street is approximately 70 vehicles per day.
PROPOSED DEVELOPMENT
Site Description
The proposed residential/mixed-use development is expected to include 65 apartment units made
up of studio, one-bedroom and two-bedroom units on floors two through four (Exhibit 2B) and a
Page 58 of 230
Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin
Page 3 of 11
September 22, 2025
parking garage (68 stalls) and a commercial space provided on the first floor. Access to the site is
proposed via two full access driveway connections: one onto North 3rd Street and one onto the
adjacent residential alley located immediately north of the proposed building (Exhibit 2A). The
residential/mixed-use development is planned to be constructed and operational next year and is
therefore included in the Full Build (with development) traffic volumes.
Trip Generation
To address any potential future traffic impacts at the study area intersections, it is necessary to
identify the hourly volume of traffic generated by anticipated development. Traffic volumes
expected to be generated are based on the size and type of the proposed uses and on trip rates and
fitted curve equations as published in the Institute of Transportation Engineers’ (ITE) Trip
Generation Manual, 11th Edition. Even though the building is expected to be four floors (one
commercial plus three residential), the ITE land use code (LU230) “Low-Rise Residential with
Ground-Floor Commercial, 2-3 floors (1-25K)” was utilized for this study in lieu of LU231
“Mid-Rise Residential with Ground-Floor Commercial, 4-10 floors (1-25K)” as a worst case
(highest volume) traffic condition. A comparison table is provided in Appendix B.
Due to the nature of the land use type, the proposed development is not expected to include
linked trips or pass-by trips. Linked trips occur when a motorist visits one or more tenants or
land use within a development site. Pass-by trips occur when motorists already on the roadway
system stop at the site prior to continuing on their intended route. Internal linked trips between
the residential and commercial land uses are already included in the ITE rates used.
The trip generation table developed for the proposed residential/mixed-use development is
shown on Exhibit 5A. As shown, the proposed development is expected to generate about 220
total trips (110 in/110 out) over a typical weekday, with 30 new trips (5 in/25 out) expected
during the weekday AM peak hour and 25 trips (20 in/5 out) expected during the weekday PM
peak hour.
Pedestrians and bicyclists may use their respective modes to access the proposed
residential/mixed-use development ; however, to allow for a conservative (highest vehicular
volume) analysis, these modes were assumed to make up a relatively small portion of the overall
trips to/from the study area. For the purpose of this TIA, all trips to/from the proposed
development site were assumed to occur via motor vehicle.
Trip Distribution
The trip distribution for the proposed development, listed below and shown in table format in
Exhibit 5A and graphically in Exhibit 5B, was determined based on the existing traffic count
patterns, the type of proposed land uses and the location of existing populations within the
immediate study area.
• 48% to/from the east on Main Street
• 43% to/from the west on Main Street
• 2% to/from the north on 2nd Street
• 7% to/from the south on 2nd Street
Page 59 of 230
Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin
Page 4 of 11
September 22, 2025
Traffic Assignment
Per direction from the Village of Mt. Horeb, two access scenarios were evaluated as part of
this study. The two access scenarios are as follows:
• Scenario 1 – Access to the site is proposed via two full access driveways
with the alley operating under two-way operation.
• Scenario 2 - Access to the site is proposed via two full access driveways
with the alley operating under one-way westbound operation.
The proposed development new trips for the two respective access scenarios were
assigned to the study intersections based on the above trip distributions. The traffic
assignment for the two respective access scenarios is shown on Exhibits 6A&B.
The new trips under Scenario 1 (Exhibit 6A) were added to the Existing traffic volumes
(Exhibit 4) to generate the “Full Build (Scenario 1)” traffic volumes. The “Full Build
(Scenario 1)” traffic volumes are shown on Exhibit 7A.
The new trips under Scenario 2 (Exhibit 6B) were added to the Existing traffic volumes
(Exhibit 4) to generate the “Full Build (Scenario 2)” traffic volumes. The “Full Build
(Scenario 2)” traffic volumes are shown on Exhibit 7B.
PEAK HOUR TRAFFIC OPERATIONS & QUEUES
The study intersections were analyzed using the Synchro 12 traffic analysis model (outputs based
on the Highway Capacity Manual, 7th Edition) and the peak hour turning movement volumes
estimated for the study area intersections. Intersection operation is defined by “level of service.”
Level of Service (LOS) is a quantitative measure that refers to the overall quality of flow at an
intersection ranging from very good, represented by LOS ‘A,’ to very poor, represented by LOS
‘F.’ For the purposes of this study, LOS D or better was used to define acceptable peak hour
operating conditions. The LOS descriptions for signalized and unsignalized intersections are in
Table 1.
Page 60 of 230
Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin
Page 5 of 11
September 22, 2025
Table 1. LOS Descriptions
The capacity analysis tables in the following sections show the peak hour LOS, delays (in
seconds per vehicle), and queues (in feet) for the Existing traffic condition and for both of the
access scenarios under the Full Build traffic condition. The Synchro capacity analysis
worksheets for all analysis scenarios are located in Appendix D.
Existing Traffic Operations
Table 2 shows the results of the weekday morning and weekday evening peak hour operational
analysis at the existing study area intersections. The existing study intersections were evaluated
using the existing geometrics and traffic control as shown on Exhibit 3, and the Existing traffic
volumes shown in Exhibit 4.
Signalized Intersections Unsignalized Intersections
Control Delay/Vehicle Avg. Control Delay Relative
LOS (sec/veh) (sec/veh) Delay
≤10 ≤10
> 10 - 20 > 10 - 15
> 20 - 35 > 15 - 25
> 35 - 55 > 25 - 35
> 55 - 80 > 35 - 50
> 80 > 50
Source: Highway Capacity Manual, Transportation Research Board, Washington, D.C., 2010
F Long
DelaysExtremely low speeds. Intersection congestion. Long delays. Extensive
traffic queues at intersections.
A
Short
Delays
Free-flow traffic operations at avearge travel speeds. Vehicles completely
unimpeded in ability to maneuver. Minimal delay at signalized intersections
B Reasonably unimpeded traffic operations at average travel speeds. Vehicle
maneuverability slightly restricted. Low traffic delays.
C Stable traffic operations. Lane changes becoming more restricted. Travel
speeds reduced to half of average free flow travel speeds. Longer
D
Moderate
Delays
Small increases in traffic flow can cause increased delays. Delays likely
attributable to increased traffic, reduced signal progression, and adverse
E Significant delays. Travel speeds reduced to one-third of average free flow
travel speed.
Page 61 of 230
Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin
Page 6 of 11
September 22, 2025
Table 2. Existing Traffic Peak Hour Operations
As shown in Table 2, all turning movements at the existing study area intersections are currently
operating acceptably at LOS D or better during the weekday morning and weekday evening peak
hours under the Existing traffic volume conditions.
Full Build Traffic Operations
The proposed site access driveways were evaluated with stop control on the development
site approaches. Tables 3 and 4 show the results of the weekday morning and weekday
evening peak hour operational analysis at the study area intersections with the proposed
development fully built out under the two respective access scenarios. The study
intersections were evaluated using the Full Build traffic volumes under the two respective
access scenarios as shown in Exhibits 7A&B.
I/S
LOS &
↗ → ↘ ↙ ← ↖ ↖ ↑ ↗ ↘ ↓ ↙ Delay
LOS
Delay
Queue
LOS
Delay
Queue
LOS A
Delay 8.9
Queue
LOS A
Delay 8.3
Queue
LOS
Delay
Queue
LOS
Delay
Queue
(-) indicates a movement that is prohibited or does not exist; (*) indicates a freeflow movement.
Delay is reported in seconds. Queue is the maximum of the 50th & 95th percentile queue, measured in feet.
25' 25' 25' 25'
PM
A A B D
9.2 8.5 12.4 29.1
Two-Way Stop Control
7.9 8.9 13.2 18.6
Node 300: 3rd Street &
Main Street
25' 25' 25' 25'
AM
A A B C
Lanes-> 1 1 1 1
125' 285' 85' 65'
PM
A A D D
3.3 5.3 36.8 35.8
Traffic Signal Control
3.8 3.1 36.7 34.9
Node 200: 2nd Street &
Main Street
150' 85' 90' 55'
AM
A A D C
Lanes-> 1 1 1 1
25' 25' 25' 25'
PM
A A A A
8.9 9.2 7.3 7.3
Two-Way Stop Control
8.9 9.2 7.3 7.3
25' 25' 25' 25'
AM
A A A A
Southbound
Node 100: 2nd Street &
Alley
Lanes-> 1 1 1 1
Intersection
Peak
Hour Metric
Level of Service (LOS) per Movement by Approach
Eastbound Westbound Northbound
Page 62 of 230
Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin
Page 7 of 11
September 22, 2025
Table 3. Full Build (Scenario 1 – Alley Two-Way Traffic)
Traffic Peak Hour Operations
I/S
LOS &
↗ → ↘ ↙ ← ↖ ↖ ↑ ↗ ↘ ↓ ↙ Delay
LOS
Delay
Queue
LOS
Delay
Queue
LOS A
Delay 9.2
Queue
LOS A
Delay 8.3
Queue
LOS
Delay
Queue
LOS
Delay
Two-Way Stop Control v/c
Queue
- -
LOS - -
Delay - -
Queue - -
LOS - -
Delay - -
Queue - -
- -
LOS - -
Delay - -
Queue - -
LOS - -
Delay - -
Queue - -
(-) indicates a movement that is prohibited or does not exist; (*) indicates a freeflow movement.
Delay is reported in seconds. Queue is the maximum of the 50th & 95th percentile queue, measured in feet.
25' - 25' *
PM
A - A *
8.5 - 7.3 *
One-Way Stop Control
8.5 - 7.3 *
Node 500: East Driveway &
3rd Street
25' - 25' *
AM
A - A *
Lanes-> 1 - 1 1
* 25' 25' -
PM
* A A -
* 7.2 8.5 -
One-Way Stop Control
* 7.2 8.7 -
Node 400: North Driveway &
Alley
* 25' 25' -
AM
* A A -
Lanes-> 1 1 1 -
- - 0.14
25' 25' 25' 25'
PM
A A B E
9.3 8.5 12.4 36.6
-
Two-Way Stop Control
8.0 8.9 13.2 19.4
Node 300: 3rd Street &
Main Street
25' 25' 25' 25'
AM
A A B C
Lanes-> 1 1 1 1
130' 285' 85' 65'
PM
A A D D
3.4 5.3 36.8 35.8
Traffic Signal Control
3.8 3.1 36.6 35.2
Node 200: 2nd Street &
Main Street
150' 90' 90' 65'
AM
A A D D
Lanes-> 1 1 1 1
25' 25' 25' 25'
PM
A A A A
8.9 9.2 7.3 7.3
Two-Way Stop Control
8.9 9.3 7.3 7.2
25' 25' 25' 25'
AM
A A A A
Southbound
Node 100: 2nd Street &
Alley
Lanes-> 1 1 1 1
Intersection
Peak
Hour Metric
Level of Service (LOS) per Movement by Approach
Eastbound Westbound Northbound
Page 63 of 230
Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin
Page 8 of 11
September 22, 2025
Table 4. Full Build (Scenario 2 - Alley One-Way Westbound Traffic)
Traffic Peak Hour Operations
As shown in Tables 3 and 4, with the additional traffic from the proposed development,
regardless of the access scenario, all turning movements at the study intersections are
expected to continue to operate acceptably at LOS D or better during the weekday morning
and weekday evening peak hours except the southbound movements at the Main Street
intersection with 3rd Street which are expected to operate at slightly higher delays under the full
build traffic volume conditions under either access scenario. Delays for the southbound
movements are expected to be about 2 to 3 seconds over the LOS D industry standard of 35
seconds during the weekday evening peak hour. The southbound movements are expected to be
1.6 seconds over the LOS D threshold under access Scenario 1 and 2.5 seconds over the LOS D
threshold under access Scenario 2. It is noted that, regardless of the access scenario, the volume
to capacity ratio (v/c) for this southbound movement during the weekday evening peak hour is
I/S
LOS &
↗ → ↘ ↙ ← ↖ ↖ ↑ ↗ ↘ ↓ ↙ Delay
LOS
Delay
Queue
LOS
Delay
Queue
LOS A
Delay 9.2
Queue
LOS A
Delay 8.3
Queue
LOS
Delay
Queue
LOS
Delay
Two-Way Stop Control v/c
Queue
- -
LOS - -
Delay - -
Queue - -
LOS - -
Delay - -
Queue - -
- -
LOS - -
Delay - -
Queue - -
LOS - -
Delay - -
Queue - -
(-) indicates a movement that is prohibited or does not exist; (*) indicates a freeflow movement.
Delay is reported in seconds. Queue is the maximum of the 50th & 95th percentile queue, measured in feet.
25' - 25' *
PM
A - A *
8.5 - 7.3 *
One-Way Stop Control
8.5 - 7.3 *
Node 500: East Driveway &
3rd Street
25' - 25' *
AM
A - A *
Lanes-> 1 - 1 1
* 25' 25' -
PM
* A A -
* 7.2 8.6 -
One-Way Stop Control
* 7.2 8.7 -
Node 400: North Driveway &
Alley
* 25' 25' -
AM
* A A -
Lanes-> 1 1 1 -
- - 0.14
25' 25' 25' 25'
PM
A A B E
9.3 8.5 12.5 37.5
-
Two-Way Stop Control
8.0 8.9 13.2 19.4
Node 300: 3rd Street &
Main Street
25' 25' 25' 25'
AM
A A B C
Lanes-> 1 1 1 1
130' 280' 85' 65'
PM
A A D D
3.4 5.2 36.8 35.8
Traffic Signal Control
3.8 3.1 36.6 35.2
Node 200: 2nd Street &
Main Street
150' 85' 90' 65'
AM
A A D D
Lanes-> 1 1 1 1
25' 25' 25' *
PM
A A A *
8.9 9.2 7.3 *
Two-Way Stop Control
8.8 9.2 7.3 *
25' 25' 25' *
AM
A A A *
Southbound
Node 100: 2nd Street &
Alley
Lanes-> 1 1 1 1
Intersection
Peak
Hour Metric
Level of Service (LOS) per Movement by Approach
Eastbound Westbound Northbound
Page 64 of 230
Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin
Page 9 of 11
September 22, 2025
only 0.14 (or less than 1/7th intersection capacity). See gap study discussion in the next section of
this report.
In addition, queues for any movement at the study area intersections are expected to increase by
1 vehicle or less regardless of the access scenario and, with the exception of the aforementioned
southbound movements at the Main Street intersection with 3rd Street, delays for any specific
movement at the study area intersections are expected to increase by 1 second or less. Therefore,
to provide for full access at all intersections during all hours of the day, providing two-way
operation along the north alley, as shown under access Scenario 1, is recommended.
GAP STUDY ANALYSIS
Because the model showed slightly higher delays for the southbound movements at the Main
Street intersection with 3rd Street, a gap analysis was completed at this intersection during the
typical weekday morning and weekday afternoon peak hours to document the existing gaps in
the east/west traffic stream and to estimate the potential availability of gaps under the full build
traffic conditions.
During the weekday AM and PM peak hours, the length of gaps, in time, between vehicles
traveling along Main Street (at 3rd Street) were counted. Critical gap and follow-up times for
vehicle turning movements were calculated based on the Highway Capacity Manual (HCM)
equations 17-1 and 17-2. These equations include adjustment factors for heavy vehicles, grade,
divided roadways, and intersection geometry. The gap analysis worksheet calculations and
compiled gap counts are located in Appendix C.
Equivalent gaps (or capacity of gaps) are calculated by adding the number of gaps available for
only one vehicle to turn, gaps long enough for two vehicles to turn, and gaps long enough for
three vehicles to turn (without counting the same gaps twice). The equivalent gaps represent the
number of additional turning movements that could be made beyond the existing turning
movements already occurring. Table 5 summarizes the findings of the gap study for the Main
Street intersection with 3rd Street during the typical weekday peak hours. The table shows the
equivalent gaps calculated from the field counts, the net new site trips assigned to the turning
movements at the intersection, and the excess gaps available for additional turning movements
above those numbers.
Table 5. Traffic Gap Study: Main Street Intersection with 3rd Street
Intersection Direction
Peak
Hour
Equivalent
Gaps
Net New
Site Trips
Excess
Gaps
Main Street & 3rd Street
AM 243 5 238
PM 140 0 140
AM 105 10 95
PM 51 5 46
AM 321 0 321
PM 235 10 225EB Left Turn from Main Street
SB Right Turn from 3rd Street
SB Left Turn from 3rd Street
Page 65 of 230
Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin
Page 10 of 11
September 22, 2025
As shown in Table 5, there are anywhere from 46 to 320 excess gaps along Main Street during
the AM or PM peak periods for additional turning movements beyond the existing traffic and site
new trip traffic assigned to the Main Street intersection with 3rd Street. These excess gaps
confirm the analysis output showing acceptable delays and queues at this intersection with the
Full Build traffic volumes. It is noted that the Main Street signalized intersection at 2nd Street
assists in the creation of these gaps in the Main Street traffic stream.
RECOMMENDATION MODIFICATONS
Recommended modifications are expected to be necessary at the study area intersections to allow
for acceptable and safe operations under the Full Build traffic volume conditions, as shown in
Exhibit 8 and detailed below. Modifications are for jurisdictional consideration and are not
legally binding. The Village of Mt. Horeb reserves the right to determine alternative solutions.
Node 100: 2nd Street with Alley
• Existing Traffic: No modifications
• Full Build Traffic: No modifications
Node 200: 2nd Street with Main Street
• Existing Traffic: No modifications
• Full Build Traffic: No modifications
Node 300: 3rd Street with Main Street
• Existing Traffic: No modifications
• Full Build Traffic: No modifications
Node 400: Proposed North Driveway with Alley
• Existing Traffic: Not applicable
• Full Build Traffic:
o Provide a full access driveway connection onto the alley as shown on the
conceptual site plan.
o Provide stop sign control on the south approach.
Node 500: Proposed East Driveway with 3rd Street
• Existing Traffic: Not applicable
• Full Build Traffic:
o Provide a full access driveway connection onto 3rd Street as shown on the
conceptual site plan.
o Provide stop sign control on the west approach.
Slightly higher delays which are expected at the Main Street intersection with 3rd Street during
the typical weekday evening peak hour under the full build traffic volume conditions. However,
since the delays are only slightly (about 2-3 second) over the LOS D threshold and queue lengths
for exiting southbound vehicles are expected to be reasonable (about 1 vehicle), and with
Page 66 of 230
Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin
Page 11 of 11
September 22, 2025
reasonable capacity ratios and traffic signals located immediately to the west that creates gaps in
the mainline east/west traffic stream, the intersection is expected to operate safely under full
build conditions.
In addition, if angle parking is desired along the alley north of the proposed development,
operations along the alley corridor are not expected to be adversely impacted since very low
volumes (approximately 70 vehicles per day) were recorded along this corridor on a typical
weekday. Angle parking could be implemented, and safe operations would be expected, if
designed per typical industry standards.
CONCLUSION
Based on the projected traffic volumes and with the recommended modifications as shown on
Exhibit 8, the proposed access driveways are expected to operate acceptably under full build
conditions with the aforementioned modifications recommended in this study. All movements at
the study area intersections are expected to operate safely and efficiently with the planned
geometric and traffic control conditions depicted in this TIA through the opening year and with
full buildout and full occupancy of the proposed development.
Appendices
Appendix A – Traffic Counts
Appendix B – Trip Generation Comparison
Appendix C – Gap Analysis
Appendix D – Existing & Full Build Traffic Synchro Analysis
Page 67 of 230
3516: 9-22-25
N
NOT TO SCALE
EXHIBIT 1
PROJECT OVERVIEW MAP
MT HOREB, WISCONSIN
Study Area Intersection
On-Site Development
LEGEND
Page 68 of 230
3516: 9-22-25
N
NOT TO SCALE
EXHIBIT 2A
CONCEPTUAL SITE PLAN
COMMERCIAL/PARKING (FIRST FLOOR)
MT HOREB, WISCONSIN
Page 69 of 230
3516: 9-22-25
N
NOT TO SCALE
EXHIBIT 2B
CONCEPTUAL SITE PLAN
APARTMENTS (2ND THROUGH 4TH FLOORS)
MT HOREB, WISCONSIN
Page 70 of 230
3516: 9-22-25
N
NOT TO SCALE
EXHIBIT 3
EXISTING TRANSPORTATION DETAIL
MT HOREB, WISCONSIN
Traffic Signal Control
Stop Sign Control
Existing Lane Configuration
Distance Between Roadways (in Feet)
LEGEND
3rd Street
SPEED
LIMIT
25
Main Street
2nd Street
3rd Street
Alley
SPEED
LIMIT
25
SPEED
LIMIT
25
SPEED
LIMIT
25
XX’
40’
165’
415’
Page 71 of 230
3516: 9-22-25
N
NOT TO SCALE
EXHIBIT 4
YEAR 2025 EXISTING TRAFFIC VOLUMES
MT HOREB, WISCONSIN
(10) 10
(15) 15
(5) 5
5 (15)
(5) 10
AM Peak Hour (7:15 - 8:15 AM)
PM Peak Hour (4:15 - 5:15 PM)
Negligible Traffic Volumes (Fewer than 3 vph)
2025 Annual Average Daily Traffic (AADT)
LEGEND
XX
(XX)
-
X,XXX
- ( - )
30 (30)
- ( - )
North Driveway East Driveway
8,900
Alley
3rd Street
2nd Street
Main Street 10,000
X,XXX 2024 Annual Average Daily Traffic ( )AADT
2022 Annual Average Daily Traffic (AADT)
1,300
400
(20) 15
10 (15)
270 (640)
35 (10)
(5) 5
(455) 485
( - ) 15
15 (10)
(30) 20
(5) 5
(45) 65
15 (20)
230 (575)
30 (50)
(5) 10
(380) 400
(10) 20
10 (20)
- (5)
40 (35)
3rd Street
9,100
(5) -
( - ) 5
(15) 15
- ( - )
- ( - )
5 (15)
5 (5)
10 (5)
( - ) -
(70) 10
X,XXX
Page 72 of 230
3516: 9-22-25
N
NOT TO SCALE
EXHIBIT 5A
ON-SITE TRIP GENERATION & DISTRIBUTION TABLES
MT HOREB, WISCONSIN
In Out Total In Out Total
220 5 25 30 20 5 25
(3.44) (23%) (77%) (0.44) (71%) (29%) (0.36)
220 5 25 30 20 5 25
TRIP DISTRIBUTION (New Trips)
East on Main Street 48% 110 5 10 10 5
West on Main Street 43% 90 0 10 10 0
North on 2nd Street 2% 0 0 0 0 0
South on 2nd Street 7% 20 0 5 0 0
100% 220 5 25 20 5
Exhibit 5A
On-Site Trip Generation Table1
1ITE Trip Rates (X.XX) and/or Fitted Curve Equations (FCE) are from the ITE Trip Generation Manual, 11th Edition.
Total New Trips
PM Peak
Low-Rise Residential with Ground-Floor
Commercial (2-3 Floors) (1-25k) 230 65 Units
Land Use
ITE
Code Proposed Size
Weekday
Daily
AM Peak
Page 73 of 230
3516: 9-22-25
N
NOT TO SCALE
EXHIBIT 5B
TRIP DISTRIBUTION DIAGRAM
MT HOREB, WISCONSIN
43%
7%
2%
North Driveway East Driveway
Alley
3rd Street
2nd Street
Main Street
Proposed Trip Distribution
LEGEND
XX%
48%
Page 74 of 230
3516: 9-22-25
N
NOT TO SCALE
EXHIBIT 6A
ON-SITE NEW TRIPS
ALLEY - TWO WAY TRAFFIC
MT HOREB, WISCONSIN
( - ) 10
10 ( - )
(15) 5
North Driveway East Driveway
(5) 15
Alley
3rd Street
2nd Street
Main Street
5 (10)
(5) -
5 ( - )
10 (5)
5 ( - )
(5) -
(5) -
5 ( - )
5 ( - )
3rd Street
(5) -
(5) -
Peak Hour (7:15 - 8: )AM 15 AM
Peak Hour (4:15 - 5:15 PM)PM
Negligible Traffic Volumes (Fewer than 3 vph)
LEGEND
XX
(XX)
-
Page 75 of 230
3516: 9-22-25
N
NOT TO SCALE
EXHIBIT 6B
ON-SITE NEW TRIPS
ALLEY - ONE WAY (WESTBOUND) TRAFFIC
MT HOREB, WISCONSIN
( - ) 10
10 ( - )
(20) 5
North Driveway East Driveway
(5) 15
Alley
3rd Street
2nd Street
Main Street
5 (10)
(10) -
5 ( - )
10 (5)
5 ( - )
(10) -
5 ( - )
5 ( - )
Peak Hour (7:15 - 8: )AM 15 AM
Peak Hour (4:15 - 5:15 PM)PM
Negligible Traffic Volumes (Fewer than 3 vph)
LEGEND
XX
(XX)
-
3rd Street
Page 76 of 230
3516: 9-22-25
N
NOT TO SCALE
EXHIBIT 6C
REDISTRIBUTED TRIPS
ALLEY - ONE WAY (WESTBOUND) TRAFFIC
MT HOREB, WISCONSIN
(5) 5
North Driveway East Driveway
Alley
3rd Street
2nd Street
Main Street
5 (5)
-5 (-5)
(-5) -10
-5 (-5)
( - ) 5
( - ) -5
5 (5)
Peak Hour (7:15 - 8: )AM 15 AM
Peak Hour (4:15 - 5:15 PM)PM
Negligible Traffic Volumes (Fewer than 3 vph)
LEGEND
XX
(XX)
-
3rd Street
(5) 5
(-5) -5
Page 77 of 230
3516: 9-22-25
N
NOT TO SCALE
( - ) 10
( - ) -
(15) 5
(20) 15
North Driveway East Driveway ( - ) -
(5) 15
Alley
3rd Street
2nd Street
Main Street
15 (25)
270 (640)
35 (10)
(10) 5
(455) 485
( - ) 15
10 (5)
20 (10) 15 (20)
235 (575)
30 (50)
(10) 10
(385) 400
(10) 20
15 (20)
5 (5)
40 (35)
3rd Street
Peak Hour (7:15 - 8: )AM 15 AM
Peak Hour (4:15 - 5:15 PM)PM
Negligible Traffic Volumes (Fewer than 3 vph)
LEGEND
XX
(XX)
-
(10) 10
(15) 15
(10) 5
- ( - )
- ( - )
15 (15)
(5) -
( - ) 5
(15) 15
- ( - )
30 (30)
- ( - )
( - ) -
(70) 10
(30) 20
(5) 5
(45) 65
EXHIBIT 7A
FULL BUILD TRAFFIC VOLUMES
ALLEY - TWO WAY TRAFFIC
MT HOREB, WISCONSIN
- ( - )
15 (10)
(5) 10
(5) -
5 (15)
- ( - )
Page 78 of 230
3516: 9-22-25
N
NOT TO SCALE
EXHIBIT 7B
FULL BUILD TRAFFIC VOLUMES
ALLEY - ONE WAY (WESTBOUND) TRAFFIC
MT HOREB, WISCONSIN
( - ) 10
North Driveway East Driveway
Alley
3rd Street
2nd Street
Main Street
20 (30)
265 (635)
35 (10)
(15) 5
(455) 485
( - ) 15
10 (5)
20 (10) 10 (15)
235 (575)
35 (50)
(5) 10
(390) 400
(10) 20
15 (20)
5 (5)
40 (35)
3rd Street
Peak Hour (7:15 - 8: )AM 15 AM
Peak Hour (4:15 - 5:15 PM)PM
Negligible Traffic Volumes (Fewer than 3 vph)
LEGEND
XX
(XX)
-
(10) 10
(15) 15
( - ) -
- ( - )
- ( - )
15 (15)
(5) 5
( - ) -
(15) 15
- ( - )
20 (30)
- ( - )
( - ) -
(70) 10
(30) 20
(5) 5
(45) 65
10 (20)
- ( - )
( - ) -
(5) 15
- ( - )
15 (10)
(20) 5
(25) 20
Page 79 of 230
3516: 9-22-25
N
NOT TO SCALE
EXHIBIT 8
RECOMMENDED MODIFICATIONS
MT HOREB, WISCONSIN
North Driveway East Driveway
Alley
3rd Street
2nd Street
Main Street
LEGEND
XX’
Traffic Signal Control
Stop Control
Storage Length (In Feet)
Existing Lane Configuration
Proposed Modifications
BLUE
Provide driveways
as shown on site plan
Page 80 of 230
3516: 9-22-25
N
NOT TO SCALE
APPENDIX B
TRIP GENERATION COMPARISON TABLE
MT HOREB, WISCONSIN
In Out Total In Out Total
220 5 25 30 20 5 25
(3.44) (23%) (77%) (0.44) (71%) (29%) (0.36)
Not 5 10 15 5 5 10
Available (23%) (77%) (0.22) (71%) (29%) (0.17)
0 15 15 15 0 15
Appendix
Trip Generation Comparison Table1
Land Use
ITE
Code Proposed Size
Weekday
Daily
AM Peak PM Peak
Low-Rise Residential with Ground-Floor
Commercial (2-3 Floors) (1-25k) 230 65 Units
Mid-Rise Residential with Ground-Floor
Commercial (4-10 Floors) (1-25k) 231 65 Units
Difference
1ITE Trip Rates (X.XX) and/or Fitted Curve Equations (FCE) are from the ITE Trip Generation Manual, 11th Edition.
Page 81 of 230
Main Street Residential/Mixed-Use Development – Mt Horeb, Wisconsin
Appendix A
Traffic Counts
Turning Movement Counts
Wavetronix Daily Count
Page 82 of 230
Version 2025.03 Page 1 of 13
Base Information, Observed (6) Hour and Estimated (24) Hour Volume Summaries
Major St: 2nd Street
Minor St: Alley
2nd Street & Alley
Site Information Count Information
SW-M
↑
AM MD PM
AM MD PM
0.877 2.359
Company Name 1.000
Comments
Observed 6 Hour Volume Summary
6
PED: 15 BIKE: 2
7 145 2 0
PED: 1 PED:
38 61 3
33
0
↑
0 North
7
BIKE: 6 BIKE:
18 6 2
11 47 67 12
PED: 5 BIKE: 3
Estimated 24 Hour AADT
14 300 4 0
2
12
68
0
↑
0 North
14
12
178
Daily/Seasonal Factor 0.877 23 97 139 25
Count Expansion Factor 2.359
Manual Adjustment Factor 1.000
Total 24 Hr Expansion Factor 2.070
7:15-8:15am
North Leg 2nd Street
Clear and Dry
Clear and Dry
AM Peak Period
Weather
Wednesday, August 6, 2025
Wednesday, August 6, 2025
Midday Peak Period
PM Peak Period Tuesday, August 5, 2025
Peak Hours Selected for Analysis
Calculated Peak Hours
Clear and Dry
West Leg Alley
South Leg 2nd Street 7:00-8:00am
Traffic Control Partial Stop Control
AM Peak Period
Midday Peak Period
PM Peak Period
Miovision
Miovision
Observers
Special Pedestrians Observed
None
None
Manual Adj.
Elementry school age children
Pre-school children
TADI
Mioribion
60
Other (describe) None None
TOTAL ENTERING VOLUME
None
Wis DOT Daily & Seasonal Factors are final for 2012 through 2024,
and 2025 uses 2024 final factors.
None
NoneWheelchairs/electric scooters
Elderly/disabled (except wheelchairs)
Visually impaired (white cane/helper dog)
20
75
40
Alley
275
137
412
319
2nd Street
569
284
853
155
83
124
Roadway Names North Direction
4:15-5:15pm
4:00-5:00pm
124
Alley
41
890
TOTAL ENTERING VOLUME
430
154
60
Alley
329
2nd Street
ESTIMATED 2nd Street
Total Entering Hourly Volume
Alley
159
99
Count Basics
Schools Not in Session
1st Day of Count Tuesday, August 5, 2025
No Special Events
Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Start Date:
County
Intersection of:
WisDOT Region13 - Dane
Weekday
Non-Holiday
Municipality Village of Mt Horeb Hrs Counted: 06:00 AM-09:00 AM and 03:00 PM-06:00 PM
Intersection Traffic Volume Report
Special Considerations
East Leg Alley
Holidays None
Special Events None
(1) Non-Interstate Low Truck %Count Expansion Group
Daily/Seasonal Adjustment Factor
Schools Not in Session
Count Expansion Factor
(1) Non-Interstate Low Truck %Daily/Seasonal Adjustment Group
24 HOUR AADT 474
HOUR VOLUMES 229
OBSERVED 2nd Street
205
24 83 50 000000
77 102 94
0
0
1,000
6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM
Motor Vehicle
Volume
One-Hour Time Period Start Time (Ex: 6am represents volume from 6am to 7am)
Page 83 of 230
Page 2 of 13
Peak Hour Volume Graphical Summary
2nd Street & Alley
AM Peak Hour Summary
PED: 4 BIKE: 0
1 30 0 0 Manual Adj. 1.000
PED: 0 PED:
3 02
2
0
↑
0 North
0
BIKE: 3 BIKE:
11 7 0
11 01 3 4
PED: 0 BIKE: 0
Midday (MD) Peak Hour Summary
PED: 0 BIKE: 0
0 0 0 0 Manual Adj. 1.000
PED: 0 PED:
0 00
0
0
↑
0 North
0
BIKE: 0 BIKE:
00 0
00 0 0
PED: 0 BIKE: 0
PM Peak Hour Summary
PED: 4 BIKE: 0
1 25 0 0 Manual Adj. 1.000
PED: 0 PED:
14 02
13
0
↑
0 North
3
BIKE: 0 BIKE:
01 7 2
3 9 15 3
PED: 2 BIKE: 1
Count Basics
Start Date: Tuesday, August 5, 2025
Total Number of Hours Counted: 6
2nd Street
58
30
88
0
0
0
0
16
20 3
Weekday
Non-Holiday
All Motor Vehicles
13
Alley
26
18
TOTAL ENTERING VOLUME
89
2nd Street
0
Alley
0
0
7
TOTAL ENTERING VOLUME
Alley
10
PM PEAK HOUR 2nd Street
4:15-5:15pm 44
30
Alley
0
0
0
0 0
0
MD PEAK HOUR
78
2nd Street
2nd Street
50
28
Intersection Traffic Volume Report
Wednesday, August 6, 2025
N/A
Tuesday, August 5, 2025
Schools Not in Session
No Special Events
AM PEAK HOUR 2nd Street TOTAL ENTERING VOLUME
7:15-8:15am 44 81
31
13
11
Alley
2
Alley
31
9
20
Page 84 of 230
Count Basics Page 3 of 13
Peak Hour Volume Summary
2nd Street & Alley
Peak Hour Volumes, Truck Percentages, and PHFs
AM Peak Hour 2nd Street Alley 2nd Street Alley
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals
7:15 AM 0 13 0 0 13 0 0 0 0 0 2 4 1 1 8 2 1 0 0 3 24
7:30 AM 1 5 0 0 6 0 0 0 0 0 1 5 2 0 8 3 1 0 0 4 18
7:45 AM 0 5 0 0 5 0 0 2 0 2 1 3 6 0 10 9 0 0 0 9 26
8:00 AM 0 7 0 0 7 0 0 0 0 0 0 1 1 0 2 3 1 0 0 4 13
Peak Hour Volume 1 30 0 0 31 0 0 2 0 2 4 13 10 1 28 17 3 0 0 20 81
Rounded Hourly Volume 0 30 0 0 30 0 0 0 0 0 5 15 10 0 30 15 5 0 0 20 80
% Single Unit Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0 0.0 0.0
% Heavy Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0
% Trucks (Total) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0 0.0 0.0
Peak Hour Factor (PHF) 0.25 0.58 0.00 0.00 0.60 0.00 0.00 0.25 0.00 0.25 0 .50 0.65 0.42 0.25 0.70 0.47 0.75 0.00 0.00 0.56 0.78
MD Peak Hour 2nd Street Alley 2nd Street Alley
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Peak Hour Volume 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Rounded Hourly Volume 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
% Single Unit Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0 0.0 0.0
% Heavy Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0
% Trucks (Total) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0 0.0 0.0
Peak Hour Factor (PHF) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 .00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PM Peak Hour 2nd Street Alley 2nd Street Alley
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals
4:15 PM 0 5 0 0 5 0 0 3 0 3 2 3 1 2 8 5 0 0 0 5 21
4:30 PM 0 6 0 0 6 0 0 7 0 7 1 3 4 0 8 4 0 0 0 4 25
4:45 PM 1 6 0 0 7 0 0 1 0 1 0 5 1 1 7 5 0 2 0 7 22
5:00 PM 0 8 0 0 8 0 0 2 0 2 0 4 3 0 7 3 0 1 0 4 21
Peak Hour Volume 1 25 0 0 26 0 0 13 0 13 3 15 9 3 30 17 0 3 0 20 89
Rounded Hourly Volume 0 25 0 0 25 0 0 15 0 15 5 15 10 5 35 15 0 5 0 20 95
% Single Unit Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0 0.0 0.0
% Heavy Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0
% Trucks (Total) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0 0.0 0.0
Peak Hour Factor (PHF) 0.25 0.78 0.00 0.00 0.81 0.00 0.00 0.46 0.00 0.46 0 .37 0.75 0.56 0.37 0.94 0.85 0.00 0.37 0.00 0.71 0.89
Peak Hour Pedestrian and Bicyclist Volumes
Pedestrians and Bicyclists Total
Ped &
2nd Street Alley 2nd Street Alley Bike
15-Minute Start Time Total Total Total Total Volume
7:15 AM 1200 3
7:30 AM 1002 3
7:45 AM 1002 3
8:00 AM 1000 1
Total 4204 1 0
12:00 PM 0000 0
12:15 PM 0000 0
12:30 PM 0000 0
12:45 PM 0000 0
Total 0000 0
4:15 PM 2304 9
4:30 PM 0011 2
4:45 PM 0104 5
5:00 PM 2025 9
Total 4 4 3 14 25
All Motor Vehicles
From West
From South From West
Weekday
West Approach
From South
From South From West
Non-Holiday
Schools Not in Session
No Special Events
Start Date: Tuesday, August 5, 2025
Total Number of Hours Counted: 6
AM
0
0
0
0
0
4
Bicyclist Pedestrian
Crossing
From North From East
From North From East
From East
Bicyclist
Wednesday, August 6, 2025
N/A
1
1
1
Pedestrian
1
0
Bicyclist
00
Pedestrian Bicyclist
CrossingCrossing
South Approach
Pedestrian
AM Peak HourMidday (MD) Peak Hour
From North
Tuesday, August 5, 2025
Crossing
North Approach
PM Peak Hour
East Approach
00
0
00
20
00
20
0
00 0000 0
00
20
11
00
31
00
00
00
00 0000 00
MD
00 00 00 00
00 00 00 0
0
00 0000 00
04
PM
20 2
00 0
40 2
00 0
20 0
Intersection Traffic Volume Report
0
001
022 1 1 4
11 50
4
0
10 10
0
0
10
Page 85 of 230
Count Basics Page 4 of 13
Hourly Volume Summary - Motor Vehicle Data
2nd Street & Alley
One-Hour Motor Vehicle Data
One-Hour Total
Time Period 2nd Street Alley 2nd Street Alley Vehicle
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume E/W N/S
6:00 AM 0 9 0 0 9 0 0 1 0 1 0 3 1 0 4 8 1 1 0 10 24 11 13
7:00 AM 2 29 0 0 31 0 0 2 0 2 5 14 11 1 31 16 2 1 0 19 83 21 62
8:00 AM 0 17 0 0 17 0 1 5 0 6 0 4 8 4 16 10 1 0 0 11 50 17 33
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 2 31 1 0 34 1 2 6 0 9 1 12 7 1 21 10 1 2 0 13 77 22 55
4:00 PM 1 34 1 0 36 0 1 11 0 12 4 18 9 3 34 18 0 2 0 20 102 32 70
5:00 PM 2 25 0 0 27 0 2 8 0 10 2 16 11 2 31 24 1 1 0 26 94 36 58
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7 145 2 0 154 1 6 33 0 40 12 67 47 11 137 86 6 7 0 99 430 139 291
Volume Totals
Non-Holiday
DirectionalFrom South From West
Weekday
PM
Start Date: Tuesday, August 5, 2025
Total Number of Hours Counted: 6
All Motor Vehicles
Schools Not in Session
No Special Events
From East
Intersection Traffic Volume Report
Totals
AMMD
From North
0
5
10
15
20
25
30
35
40
0
20
40
60
80
100
120
6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM
Entering Vehicle Volume By Approach (Line Chart)
Total Entering Vehicle Volume (Bar Chart)
One-Hour Time Period Start Time
(For example, 6am represents volumes from 6am to 7am)
Graphical Summary of Hourly Volumes
All Motor Vehicles Southbound Approach Westbound Approach
Northbound Approach Eastbound Approach
Page 86 of 230
Count Basics Page 5 of 13
15-Minute Motor Vehicle Data
2nd Street & Alley
15-Minute Motor Vehicle Data
15-Minute
Time Period 2nd Street Alley 2nd Street Alley 15-Min Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum PHF
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 1 24 0.40
6:15 AM 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 1 0 0 0 1 2 38 0.63
6:30 AM 0 7 0 0 7 0 0 0 0 0 0 0 0 0 0 6 1 1 0 8 15 60 0.63
6:45 AM 0 2 0 0 2 0 0 0 0 0 0 3 1 0 4 0 0 0 0 0 6 63 0.66
7:00 AM 1 6 0 0 7 0 0 0 0 0 1 2 2 0 5 2 0 1 0 3 15 83 0.80
7:15 AM 0 13 0 0 13 0 0 0 0 0 2 4 1 1 8 2 1 0 0 3 24 81 0.78
7:30 AM 1 5 0 0 6 0 0 0 0 0 1 5 2 0 8 3 1 0 0 4 18 74 0.71
7:45 AM 0 5 0 0 5 0 0 2 0 2 1 3 6 0 10 9 0 0 0 9 26 64 0.62
8:00 AM 0 7 0 0 7 0 0 0 0 0 0 1 1 0 2 3 1 0 0 4 13 50 0.74
8:15 AM 0 5 0 0 5 0 0 4 0 4 0 2 1 0 3 5 0 0 0 5 17
8:30 AM 0 2 0 0 2 0 0 0 0 0 0 0 3 2 5 1 0 0 0 1 8
8:45 AM 0 3 0 0 3 0 1 1 0 2 0 1 3 2 6 1 0 0 0 1 12
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 2 6 0 0 8 0 0 2 0 2 0 2 1 1 4 5 0 0 0 5 19 77 0.88
3:15 PM 0 8 1 0 9 1 0 1 0 2 0 4 4 0 8 2 0 1 0 3 22 92 0.68
3:30 PM 0 9 0 0 9 0 1 1 0 2 0 4 1 0 5 0 1 0 0 1 17 91 0.67
3:45 PM 0 8 0 0 8 0 1 2 0 3 1 2 1 0 4 3 0 1 0 4 19 99 0.73
4:00 PM 0 17 1 0 18 0 1 0 0 1 1 7 3 0 11 4 0 0 0 4 34 102 0.75
4:15 PM 0 5 0 0 5 0 0 3 0 3 2 3 1 2 8 5 0 0 0 5 21 89 0.89
4:30 PM 0 6 0 0 6 0 0 7 0 7 1 3 4 0 8 4 0 0 0 4 25 92 0.92
4:45 PM 1 6 0 0 7 0 0 1 0 1 0 5 1 1 7 5 0 2 0 7 22 94 0.87
5:00 PM 0 8 0 0 8 0 0 2 0 2 0 4 3 0 7 3 0 1 0 4 21 94 0.87
5:15 PM 1 6 0 0 7 0 0 1 0 1 0 3 2 2 7 9 0 0 0 9 24
5:30 PM 1 6 0 0 7 0 2 5 0 7 0 3 3 0 6 6 1 0 0 7 27
5:45 PM 0 5 0 0 5 0 0 0 0 0 2 6 3 0 11 6 0 0 0 6 22
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7 145 2 0 154 1 6 33 0 40 12 67 47 11 137 86 6 7 0 99 430
Peak Hour All Vehicle Volume Summary
Hourly Total
Time Period 2nd Street Alley 2nd Street Alley Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume PHF
AM 7:15 AM 1 30 0 0 31 0 0 2 0 2 4 13 10 1 28 17 3 0 0 20 81 0.78
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 1 25 0 0 26 0 0 13 0 13 3 15 9 3 30 17 0 3 0 20 89 0.89
From North From East From South From West
From West
Tuesday, August 5, 2025
Total Number of Hours Counted: 6
All Motor Vehicles
AM Peak Period
Weekday Schools Not in Session
Non-Holiday No Special Events
Start Date:
From North From East From South
Intersection Traffic Volume Report
Midday Peak PeriodPM Peak Period
Totals
Page 87 of 230
Count Basics Page 6 of 13
15-Minute Automobile Data
2nd Street & Alley
15-Minute Automobile Data
15-Minute
Time Period 2nd Street Alley 2nd Street Alley 15-Min Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 1 22
6:15 AM 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 1 36
6:30 AM 0 7 0 0 7 0 0 0 0 0 0 0 0 0 0 6 0 1 0 7 14 59
6:45 AM 0 2 0 0 2 0 0 0 0 0 0 3 1 0 4 0 0 0 0 0 6 63
7:00 AM 1 6 0 0 7 0 0 0 0 0 1 2 2 0 5 2 0 1 0 3 15 83
7:15 AM 0 13 0 0 13 0 0 0 0 0 2 4 1 1 8 2 1 0 0 3 24 81
7:30 AM 1 5 0 0 6 0 0 0 0 0 1 5 2 0 8 3 1 0 0 4 18 74
7:45 AM 0 5 0 0 5 0 0 2 0 2 1 3 6 0 10 9 0 0 0 9 26 64
8:00 AM 0 7 0 0 7 0 0 0 0 0 0 1 1 0 2 3 1 0 0 4 13 50
8:15 AM 0 5 0 0 5 0 0 4 0 4 0 2 1 0 3 5 0 0 0 5 17
8:30 AM 0 2 0 0 2 0 0 0 0 0 0 0 3 2 5 1 0 0 0 1 8
8:45 AM 0 3 0 0 3 0 1 1 0 2 0 1 3 2 6 1 0 0 0 1 12
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 2 6 0 0 8 0 0 2 0 2 0 2 1 1 4 5 0 0 0 5 19 74
3:15 PM 0 7 1 0 8 1 0 1 0 2 0 4 4 0 8 2 0 1 0 3 21 88
3:30 PM 0 8 0 0 8 0 1 1 0 2 0 4 0 0 4 0 1 0 0 1 15 88
3:45 PM 0 8 0 0 8 0 1 2 0 3 1 2 1 0 4 3 0 1 0 4 19 98
4:00 PM 0 16 1 0 17 0 1 0 0 1 1 7 3 0 11 4 0 0 0 4 33 101
4:15 PM 0 5 0 0 5 0 0 3 0 3 2 3 1 2 8 5 0 0 0 5 21 89
4:30 PM 0 6 0 0 6 0 0 7 0 7 1 3 4 0 8 4 0 0 0 4 25 92
4:45 PM 1 6 0 0 7 0 0 1 0 1 0 5 1 1 7 5 0 2 0 7 22 94
5:00 PM 0 8 0 0 8 0 0 2 0 2 0 4 3 0 7 3 0 1 0 4 21 94
5:15 PM 1 6 0 0 7 0 0 1 0 1 0 3 2 2 7 9 0 0 0 9 24
5:30 PM 1 6 0 0 7 0 2 5 0 7 0 3 3 0 6 6 1 0 0 7 27
5:45 PM 0 5 0 0 5 0 0 0 0 0 2 6 3 0 11 6 0 0 0 6 22
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7 142 2 0 151 1 6 33 0 40 12 67 46 11 136 85 5 7 0 97 424
Peak Hour Automobile Volume Summary
Hourly Total
Time Period 2nd Street Alley 2nd Street Alley Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume
AM 7:15 AM 1 30 0 0 31 0 0 2 0 2 4 13 10 1 28 17 3 0 0 20 81
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 1 25 0 0 26 0 0 13 0 13 3 15 9 3 30 17 0 3 0 20 89
From North From East From South From West
From South From West
PM Peak Period
Totals
AM Peak PeriodMidday Peak Period
From North From East
Automobiles (Cars, Light Trucks, & Motorcycles)
Intersection Traffic Volume Report Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Weekday Schools Not in Session
Non-Holiday No Special Events
Start Date:
Page 88 of 230
Count Basics Page 7 of 13
15-Minute Single Unit (SU) Truck & Bus Data
2nd Street & Alley
15-Minute Single Unit (SU) Truck & Bus Data
15-Minute
Time Period 2nd Street Alley 2nd Street Alley 15-Min Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
6:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
6:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 1
6:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
3:15 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 4
3:30 PM 0 1 0 0 1 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 2 3
3:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
4:00 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1
4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 300 30 000 00 010 10 100 1 5
SU Truck %age:
0.0% 2.1% 0.0% 0.0% 1.9% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.1% 0.0% 0.7% 0.0 % 16.7% 0.0% 0.0% 1.0% 1.2%
Peak Hour Single Unit (SU) Truck & Buses Volume Summary
Hourly Total
Time Period 2nd Street Alley 2nd Street Alley Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume
AM 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
From North From East From South From West
From South From West
PM Peak Period
Totals
AM Peak PeriodMidday Peak Period
From North From East
Single Unit (SU) Trucks & Buses
Intersection Traffic Volume Report Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Weekday Schools Not in Session
Non-Holiday No Special Events
Start Date:
Page 89 of 230
Count Basics Page 8 of 13
15-Minute Semi-Truck Data
2nd Street & Alley
15-Minute Semi-Truck Data
15-Minute
Time Period 2nd Street Alley 2nd Street Alley 15-Min Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
6:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 1 1
6:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 000 00 000 00 000 01 000 1 1
Semi Truck %age: 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 1.2 % 0.0% 0.0% 0.0% 1.0% 0.2%
Peak Hour Semi-Truck Volume Summary
Hourly Total
Time Period 2nd Street Alley 2nd Street Alley Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume
AM 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
From North From East From South From West
From WestFrom East From South
PM Peak Period
Totals
AM Peak PeriodMidday Peak Period
From North
Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Semi-Trucks
Weekday Schools Not in Session
Non-Holiday No Special Events
Start Date:
Intersection Traffic Volume Report
Page 90 of 230
Count Basics Page 9 of 13
15-Minute Heavy Vehicle Data
2nd Street & Alley
15-Minute Heavy Vehicle Data
15-Minute
Time Period 2nd Street Alley 2nd Street Alley 15-Min Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
6:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 1 2
6:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 1
6:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
3:15 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 4
3:30 PM 0 1 0 0 1 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 2 3
3:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
4:00 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1
4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 300 30 000 00 010 11 100 2 6
Total Truck %age: 0.0% 2.1% 0.0% 0.0% 1.9% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.1% 0.0% 0.7% 1.2 % 16.7% 0.0% 0.0% 2.0% 1.4%
Peak Hour Heavy Vehicle Volume Summary
Hourly Total
Time Period 2nd Street Alley 2nd Street Alley Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume
AM 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
From North From East From South From West
From South From West
PM Peak Period
Totals
AM Peak PeriodMidday Peak Period
From North From East
Heavy Vehicles (Single-Unit Trucks, Buses & Semi-Trucks)
Intersection Traffic Volume Report Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Weekday Schools Not in Session
Non-Holiday No Special Events
Start Date:
Page 91 of 230
Count Basics Page 10 of 13
15-Minute Heavy Vehicle Percentages
2nd Street & Alley
15-Minute Heavy Vehicle Percentages
Total Hourly
15-Minute Heavy Heavy
Time Period 2nd Street Alley 2nd Street Alley Vehicle Vehicle
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Percent Percent
6:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 8.3
6:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 0.0 0.0 0.0 100.0 50.0 5.3
6:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 0.0 0.0 12.5 6.7 1.7
6:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0
7:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0
7:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0
7:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0
7:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0
8:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0
8:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
8:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
8:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
10:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
10:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
10:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
10:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
11:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
11:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
11:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
11:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
12:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
12:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
12:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
12:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
1:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
1:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
1:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
1:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
2:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
2:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
2:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
2:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
3:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 3.9
3:15 PM 0.0 12.5 0.0 0.0 11.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.5 4.3
3:30 PM 0.0 11.1 0.0 0.0 11.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 0.0 20.0 0.0 0.0 0.0 0.0 0.0 11.8 3.3
3:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 1.0
4:00 PM 0.0 5.9 0.0 0.0 5.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 2.9 1.0
4:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0
4:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0
4:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0
5:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0
5:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
5:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
5:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
6:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
6:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
6:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
6:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
7:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
7:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
7:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
7:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
8:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
8:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
8:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
8:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
0.0 2.1 0.0 0.0 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0 0.7 1.2 16.7 0.0 0.0 2.0 1. 4
Semi Truck Percentage: 0.2326
Peak Hour Heavy Vehicle Percentages Summary
Hourly
Hourly Heavy
Time Period 2nd Street Alley 2nd Street Alley Vehicle
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Percent
AM 7:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
MD 12:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
PM 4:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
From North From East From South From West
From South From WestFrom East
Intersection Traffic Volume Report Start Date: Tuesday, August 5, 2025
Total Number of Hours Counted: 6
PM Peak Period
Totals
AM Peak PeriodMidday Peak Period
From North
%
Weekday Schools Not in Session
Non-Holiday
Heavy Vehicles (Single-Unit Trucks, Buses & Semi-Trucks)
No Special Events
Page 92 of 230
Page 11 of 13
15-Minute Pedestrian and Bicyclist Data
2nd Street & Alley
15-Minute Pedestrian and Bicyclist Data
15-Minute
Time Period 2nd Street Alley 2nd Street Alley 15-Min Hourly
Start Time Total Total Total Total Totals Sum
6:00 AM 0000 0 3
6:15 AM 0000 0 5
6:30 AM 0100 1 8
6:45 AM 0002 2 1 0
7:00 AM 0002 2 1 1
7:15 AM 1200 3 1 0
7:30 AM 1002 3 1 2
7:45 AM 1002 3 1 2
8:00 AM 1000 1 1 4
8:15 AM 0104 5
8:30 AM 1011 3
8:45 AM 0311 5
9:00 AM 0000 0
9:15 AM 0000 0
9:30 AM 0000 0
9:45 AM 0000 0
10:00 AM 0000 0
10:15 AM 0000 0
10:30 AM 0000 0
10:45 AM 0000 0
11:00 AM 0000 0
11:15 AM 0000 0
11:30 AM 0000 0
11:45 AM 0000 0
12:00 PM 0000 0
12:15 PM 0000 0
12:30 PM 0000 0
12:45 PM 0000 0
1:00 PM 0000 0
1:15 PM 0000 0
1:30 PM 0000 0
1:45 PM 0000 0
2:00 PM 0000 0
2:15 PM 0000 0
2:30 PM 0000 0
2:45 PM 0000 0
3:00 PM 1103 5 9
3:15 PM 1000 1 7
3:30 PM 0001 1 1 5
3:45 PM 1001 2 1 6
4:00 PM 0111 3 1 9
4:15 PM 2304 9 2 5
4:30 PM 0011 2 2 1
4:45 PM 0104 5 2 6
5:00 PM 2025 9 2 3
5:15 PM 2111 5
5:30 PM 3013 7
5:45 PM 0101 2
6:00 PM 0000 0
6:15 PM
0000 0
6:30 PM 0000 0
6:45 PM 0000 0
7:00 PM 0000 0
7:15 PM 0000 0
7:30 PM 0000 0
7:45 PM 0000 0
8:00 PM 0000 0
8:15 PM 0000 0
8:30 PM 0000 0
8:45 PM 0000 0
9:00 PM 0000 0
9:15 PM 0000 0
9:30 PM 0000 0
9:45 PM 0000 0
17 15 8 39 79
Special Pedestrians
Pedestrian Type
Other (None)
Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Start Date:
Count Basics
Unknown
West Approach
00
Pedestrians and Bicyclists
00 00
10
40
4
00 00 0
0
00
00 00
00 00 00
00
00
00
Crossing
0
00 00
00 0
00 00
00 000
Crossing Crossing
0
00
North Approach East Approach South Approach
00
000
00 00 00
00
00 00 0
00 00 00
PM Peak Period
00 0
0
0
0
00 0
00 10 00
11
00
00
00
1
00 00 00 00
00 00 00
00 0 00
00 00 00
00 00 00 00
0
30 00 01 30
10 10
00 01 15 0
00 01 00
0
00 00 10 10
20 21 00
10
00 10 10 10
10 00 00
00
00 00 00 10
01 00 00
00
10 10 00 30
00 00 00
00
00 00 00 00
00 00 00
00
00 00 00 00
00 00 00
00
00
00 00 00 00
00 00 00
00
00
00 00 00
00 00 00
0
00
00
00 00 00 00
00 00 00
00
00 00 00 00
00 00 00
00
00 00 00 00
00 00 00
00
00 00 00 00
00 00 00
00
00 00 00 00
000 00
0
10 10
0
11
0
00 000
4000 10
00 00 00
0
1
0
10 00
0
00 01
10 20 00 0
20
Crossing
00 0
0
10 0
0
Pedestrian Bicyclist Pedestrian
00
0
1
0
0
00
Bicyclist
0
0
0
0
AM Peak Period
0
Midday Peak Period
0
0
0
0
0
0
0
0
00
00 0
0
0
00
3
0
1
Pedestrian Bicyclist
00
00
00
0
0
00
00
0
200
3
0
00
0
00
0
00 00
0
00 00
0
0
00 00
0
Elderly/Disabled (except wheelchai
Wheelchairs/Electric Scooters
x
x
x
x
x
x
1 or 2 A Few Several Many
Weekday Schools Not in Session
Non-Holiday No Special Events
Totals 15 2 13
None
Pre-school Children
Elementry School Age Children
Visually Impaired (white cane/help
e
38 1
Pedestrian Bicyclist
00
5
0
2
0
1
00
00
2
20
Intersection Traffic Volume Report
Page 93 of 230
Page 12 of 13
15-Minute Adult & Children Count (Manual Entry)
2nd Street & Alley
15-Minute Adult & Children Pedestrian Data
15-Minute
Time Period 2nd Street Alley 2nd Street Alley 15-Min Hourly
Start Time Total Total Total Total Totals Sum
12:00 AM 0000 0 0
12:15 AM 0000 0 0
12:30 AM 0000 0 0
12:45 AM 0000 0 0
1:00 AM 0000 0 0
1:15 AM 0000 0 0
1:30 AM 0000 0 0
1:45 AM 0000 0 0
2:00 AM 0000 0 0
2:15 AM 0000 0 0
2:30 AM 0000 0 0
2:45 AM 0000 0 0
3:00 AM 0000 0 0
3:15 AM 0000 0 0
3:30 AM 0000 0 0
3:45 AM 0000 0 0
4:00 AM 0000 0 0
4:15 AM 0000 0 0
4:30 AM 0000 0 0
4:45 AM 0000 0 0
5:00 AM 0000 0 0
5:15 AM 0000 0 0
5:30 AM 0000 0 0
5:45 AM 0000 0 1
6:00 AM 0000 0 3
6:15 AM 0000 0 5
6:30 AM 0100 1 8
6:45 AM 0002 2 1 0
7:00 AM 0002 2 1 0
7:15 AM 1200 3 9
7:30 AM 1002 3 1 1
7:45 AM 1001 2 1 0
8:00 AM 1000 1 1 3
8:15 AM 0104 5 1 2
8:30 AM 1001 2 7
8:45 AM 0311 5 5
9:00 AM 0000 0 0
9:15 AM 0000 0 0
9:30 AM 0000 0 0
9:45 AM 0000 0 0
10:00 AM 0000 0 0
10:15 AM 0000 0 0
10:30 AM 0000 0 0
10:45 AM 0000 0 0
11:00 AM 0000 0 0
11:15 AM 0000 0 0
11:30 AM 0000 0 0
11:45 AM 0000 0 0
12:00 PM 0000 0 0
12:15 PM
0000 0 0
12:30 PM 0000 0 0
12:45 PM 0000 0 0
1:00 PM 0000 0 0
1:15 PM 0000 0 0
1:30 PM 0000 0 0
1:45 PM 0000 0 0
2:00 PM 0000 0 0
2:15 PM 0000 0 5
2:30 PM 0000 0 5
2:45 PM 0000 0 6
3:00 PM 1103 5 8
3:15 PM 0000 0 6
3:30 PM 0001 1 1 4
3:45 PM 1001 2 1 5
4:00 PM 0111 3 1 7
4:15 PM 2204 8 2 2
4:30 PM 0011 2 1 8
4:45 PM 0004 4 2 2
5:00 PM 2015 8 2 0
5:15 PM 1111 4 1 2
5:30 PM 3003 6 8
5:45 PM 0101 2 2
6:00 PM 0000 0 0
6:15 PM 0000 0 0
6:30 PM 0000 0 0
6:45 PM 0000 0 0
7:00 PM 0000 0 0
7:15 PM 0000 0 0
7:30 PM 0000 0 0
7:45 PM 0000 0 0
8:00 PM 0000 0 0
8:15 PM 0000 0 0
8:30 PM 0000 0 0
8:45 PM 0000 0 0
9:00 PM 0000 0 0
9:15 PM 0000 0 0
9:30 PM 0000 0 0
9:45 PM 0000 0 0
10:00 PM 0000 0 0
10:15 PM 0000 0 0
10:30 PM 0000 0 0
10:45 PM 0000 0 0
11:00 PM 0000 0 0
11:15 PM 0000 0
11:30 PM 0000 0
11:45 PM 0000 0
15 13 5 38 71
Count Basics
Start Date: Tuesday, August 5, 2025 Weekday Schools Not in Session
Total Number of Hours Counted: 6 Non-Holiday No Special Events
Adults Children Adults Children Adults Children Adults Children
Adults & Children
Crossing Crossing Crossing Crossing
North Approach East Approach South Approach West Approach
0
000
0
0
00
0
02
010
2
1200
000
2
1001
100
0
0104
100
1
0311
100
0
0000
000
0
Midday Peak Period
0
0000
000
0
0
0
0000
000
0
0000
000
0
0000
000
0
0000
000
0
0000
000
PM Peak Period
000
00
000
000
0
0000
0
00
1103
0
1
1001
000
1
2204
011
1
0004
001
5
1111
201
3
0101
300
0
0000
000
0
0000
000
0
0000
000
0
0000
000
0
0000
000
0
0000
000
0
0000
000
0
0000
000
03 8 0Totals 15 0 13 0 5
0
0
0
00
00
0
0
0
0
0
0
0
0
0
0
00
AM Peak Period Pre-AM Peak Period
0000
0000
0000
0
000
0000
0000
000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0
0
0
0
0
0
0000
0000
0000
0000
Intersection Traffic Volume Report
0000
0000
Post PM Peak Period
000
Page 94 of 230
Count Basics Page 13 of 1 3
15-Minute Bicycle Turning Movement Count (Manual Entry)
2nd Street & Alley
15-Minute Bicycle Data
15-Minute
Time Period 2nd Street Alley 2nd Street Alley 15-Min Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum
12:00 AM 0000 0 0
12:15 AM 0000 0 0
12:30 AM 0000 0 0
12:45 AM 0000 0 0
1:00 AM 0000 0 0
1:15 AM 0000 0 0
1:30 AM 0000 0 0
1:45 AM 0000 0 0
2:00 AM 0000 0 0
2:15 AM 0000 0 0
2:30 AM 0000 0 0
2:45 AM 0000 0 0
3:00 AM 0000 0 0
3:15 AM 0000 0 0
3:30 AM 0000 0 0
3:45 AM 0000 0 0
4:00 AM 0000 0 0
4:15 AM 0000 0 0
4:30 AM 0000 0 0
4:45 AM 0000 0 0
5:00 AM 0000 0 0
5:15 AM 0000 0 0
5:30 AM 0000 0 0
5:45 AM 0000 0 0
6:00 AM 0000 0 0
6:15 AM 0000 0 0
6:30 AM 0000 0 0
6:45 AM 0000 0 0
7:00 AM 0000 0 0
7:15 AM 0000 0 0
7:30 AM 0000 0 0
7:45 AM 0000 0 0
8:00 AM 0000 0 0
8:15 AM 0000 0 0
8:30 AM 0000 0 0
8:45 AM 0000 0 0
9:00 AM 0000 0 0
9:15 AM 0000 0 0
9:30 AM 0000 0 0
9:45 AM 0000 0 0
10:00 AM 0000 0 0
10:15 AM 0000 0 0
10:30 AM 0000 0 0
10:45 AM 0000 0 0
11:00 AM 0000 0 0
11:15 AM 0000 0 0
11:30 AM 0000 0 0
11:45 AM 0000 0 0
12:00 PM 0000 0 0
12:15 PM 0000 0 0
12:30 PM 0000 0 0
12:45 PM 0000 0 0
1:00 PM 0000 0 0
1:15 PM 0000 0 0
1:30 PM 0000 0 0
1:45 PM 0000 0 0
2:00 PM 0000 0 0
2:15 PM 0000 0 0
2:30 PM 0000 0 0
2:45 PM 0000 0 0
3:00 PM 0000 0 0
3:15 PM 0000 0 0
3:30 PM 0000 0 0
3:45 PM 0000 0 0
4:00 PM 0000 0 0
4:15 PM 0000 0 0
4:30 PM 0000 0 0
4:45 PM 0000 0 0
5:00 PM 0000 0 0
5:15 PM 0000 0 0
5:30 PM 0000 0 0
5:45 PM 0000 0 0
6:00 PM 0000 0 0
6:15 PM 0000 0 0
6:30 PM 0000 0 0
6:45 PM 0000 0 0
7:00 PM 0000 0 0
7:15 PM 0000 0 0
7:30 PM 0000 0 0
7:45 PM 0000 0 0
8:00 PM 0000 0 0
8:15 PM 0000 0 0
8:30 PM 0000 0 0
8:45 PM 0000 0 0
9:00 PM 0000 0 0
9:15 PM 0000 0 0
9:30 PM 0000 0 0
9:45 PM 0000 0 0
10:00 PM 0000 0 0
10:15 PM 0000 0 0
10:30 PM 0000 0 0
10:45 PM 0000 0 0
11:00 PM 0000 0 0
11:15 PM 0000 0
11:30 PM 0000 0
11:45 PM 0000 0
0 000 00 000 00 000 00 000 0 0
Peak Hour Bicycle Turning Movement Volume Summary
Hourly Total
Time Period 2nd Street Alley 2nd Street Alley Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume
AM 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
From North From East From South From West
Post PM Peak Period AM Peak PeriodPM Peak Period
Totals
Schools Not in Session
Total Number of Hours Counted: 6 Non-Holiday No Special Events
Midday Peak Period
Bicyclists
From North
Pre-AM Peak Period
Start Date: Tuesday, August 5, 2025 Weekday
From East From South From West
Intersection Traffic Volume Report
Page 95 of 230
Count Basics Special Report
15-Minute Motor Vehicle Data (Daily & Seasonally Adjusted)
2nd Street & Alley
15-Minute Motor Vehicle Data
15-Minute
Time Period 2nd Street Alley 2nd Street Alley 15-Min Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum PHF
12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 1 22 0.42
6:15 AM 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 1 0 0 0 1 2 35 0.63
6:30 AM 0 6 0 0 6 0 0 0 0 0 0 0 0 0 0 5 1 1 0 7 13 55 0.63
6:45 AM 0 2 0 0 2 0 0 0 0 0 0 3 1 0 4 0 0 0 0 0 6 58 0.66
7:00 AM 1 5 0 0 6 0 0 0 0 0 1 2 2 0 5 2 0 1 0 3 14 75 0.82
7:15 AM 0 11 0 0 11 0 0 0 0 0 2 4 1 1 8 2 1 0 0 3 22 73 0.79
7:30 AM 1 4 0 0 5 0 0 0 0 0 1 4 2 0 7 3 1 0 0 4 16 66 0.72
7:45 AM 0 4 0 0 4 0 0 2 0 2 1 3 5 0 9 8 0 0 0 8 23 58 0.63
8:00 AM 0 6 0 0 6 0 0 0 0 0 0 1 1 0 2 3 1 0 0 4 12 47 0.78
8:15 AM 0 4 0 0 4 0 0 4 0 4 0 2 1 0 3 4 0 0 0 4 15
8:30 AM 0 2 0 0 2 0 0 0 0 0 0 0 3 2 5 1 0 0 0 1 8
8:45 AM 0 3 0 0 3 0 1 1 0 2 0 1 3 2 6 1 0 0 0 1 12
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 2 5 0 0 7 0 0 2 0 2 0 2 1 1 4 4 0 0 0 4 17 72 0.86
3:15 PM 0 7 1 0 8 1 0 1 0 2 0 4 4 0 8 2 0 1 0 3 21 86 0.69
3:30 PM 0 8 0 0 8 0 1 1 0 2 0 4 1 0 5 0 1 0 0 1 16 84 0.68
3:45 PM 0 7 0 0 7 0 1 2 0 3 1 2 1 0 4 3 0 1 0 4 18 91 0.73
4:00 PM 0 15 1 0 16 0 1 0 0 1 1 6 3 0 10 4 0 0 0 4 31 92 0.74
4:15 PM 0 4 0 0 4 0 0 3 0 3 2 3 1 2 8 4 0 0 0 4 19 81 0.88
4:30 PM 0 5 0 0 5 0 0 6 0 6 1 3 4 0 8 4 0 0 0 4 23 84 0.91
4:45 PM 1 5 0 0 6 0 0 1 0 1 0 4 1 1 6 4 0 2 0 6 19 85 0.89
5:00 PM 0 7 0 0 7 0 0 2 0 2 0 4 3 0 7 3 0 1 0 4 20 85 0.89
5:15 PM 1 5 0 0 6 0 0 1 0 1 0 3 2 2 7 8 0 0 0 8 22
5:30 PM 1 5 0 0 6 0 2 4 0 6 0 3 3 0 6 5 1 0 0 6 24
5:45 PM 0 4 0 0 4 0 0 0 0 0 2 5 3 0 10 5 0 0 0 5 19
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7 124 2 0 133 1 6 31 0 38 12 63 46 11 132 77 6 7 0 90 393
Peak Hour All Vehicle Volume Summary
Hourly Total
Time Period 2nd Street Alley 2nd Street Alley Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume PHF
AM 7:15 AM 1 25 0 0 26 0 0 2 0 2 4 12 9 1 26 16 3 0 0 19 73 0.79
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 1 21 0 0 22 0 0 12 0 12 3 14 9 3 29 15 0 3 0 18 81 0.88
From South From West
Schools Not in Session
Total Number of Hours Counted: 6 Non-Holiday No Special Events
Start Date: Tuesday, August 5, 2025 WeekdayIntersection Traffic Volume Report
All Motor Vehicles
From North From East From South From West
From East
PM Peak Period
Totals
Post PM Peak Period Midday Peak Period
From North
AM Peak Period Pre-AM Peak Period
Page 96 of 230
Version 2025.03 Page 1 of 13
Base Information, Observed (6) Hour and Estimated (24) Hour Volume Summaries
Major St: Main Street
Minor St: 2nd Street
Main Street & 2nd Street
Site Information Count Information
SW-M
↑
AM MD PM
AM MD PM
0.877 2.359
Company Name 1.000
Comments
Observed 6 Hour Volume Summary
6
PED: 59 BIKE: 9
64 31 180 0
PED: 83 PED:
59 2039 48
208
0
↑
0 North
35
BIKE: 2053 BIKE:
19 94 6
0 108 23 267
PED: 70 BIKE: 6
Estimated 24 Hour AADT
132 64 373 0
172
4220
431
0
↑
0 North
72
4249
195
Daily/Seasonal Factor 0.877 0 224 48 553
Count Expansion Factor 2.359
Manual Adjustment Factor 1.000
Total 24 Hr Expansion Factor 2.070
7:15-8:15am
North Leg 2nd Street
Clear and Dry
Clear and Dry
AM Peak Period
Weather
Wednesday, August 6, 2025
Wednesday, August 6, 2025
Midday Peak Period
PM Peak Period Tuesday, August 5, 2025
Peak Hours Selected for Analysis
Calculated Peak Hours
Clear and Dry
West Leg Main Street
South Leg 2nd Street 7:15-8:15am
Traffic Control Traffic Signal
AM Peak Period
Midday Peak Period
PM Peak Period
Amy Scheuerlein
Amy Scheuerlein
Observers
Special Pedestrians Observed
None
None
Manual Adj.
Elementry school age children
Pre-school children
TADI
None
2211
Other (describe) None None
TOTAL ENTERING VOLUME
None
Wis DOT Daily & Seasonal Factors are final for 2012 through 2024,
and 2025 uses 2024 final factors.
None
NoneWheelchairs/electric scooters
Elderly/disabled (except wheelchairs)
Visually impaired (white cane/helper dog)
2500
141
2330
Main Street
333
398
731
569
2nd Street
689
824
1,513
292
4823
4576
Roadway Names North Direction
4:15-5:15pm
4:15-5:15pm
9,997
Main Street
5175
10,732
TOTAL ENTERING VOLUME
5,185
275
4,830
Main Street
9,093
2nd Street
ESTIMATED 2nd Street
Total Entering Hourly Volume
Main Street
4,393
2182
Count Basics
Schools Not in Session
1st Day of Count Tuesday, August 5, 2025
No Special Events
Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Start Date:
County
Intersection of:
WisDOT Region13 - Dane
Weekday
Non-Holiday
Municipality Village of Mt Horeb Hrs Counted: 06:00 AM-09:00 AM and 03:00 PM-06:00 PM
Intersection Traffic Volume Report
Special Considerations
East Leg Main Street
Holidays None
Special Events None
(1) Non-Interstate Low Truck %Count Expansion Group
Daily/Seasonal Adjustment Factor
Schools Not in Session
Count Expansion Factor
(1) Non-Interstate Low Truck %Daily/Seasonal Adjustment Group
24 HOUR AADT 861
HOUR VOLUMES 416
OBSERVED 2nd Street
4516
456
802 774
000000
894
1158 1101
0
0
1,000
2,000
6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM
Motor Vehicle
Volume
One-Hour Time Period Start Time (Ex: 6am represents volume from 6am to 7am)
Page 97 of 230
Page 2 of 13
Peak Hour Volume Graphical Summary
Main Street & 2nd Street
AM Peak Hour Summary
PED: 0 BIKE: 2
9 2 41 0 Manual Adj. 1.000
PED: 14 PED:
3 222 2
30
0
↑
0 North
9
BIKE: 402 BIKE:
12 0 1
01 8 6 6 5
PED: 9 BIKE: 1
Midday (MD) Peak Hour Summary
PED: 0 BIKE: 0
0 0 0 0 Manual Adj. 1.000
PED: 0 PED:
0 00
0
0
↑
0 North
0
BIKE: 0 BIKE:
00 0
00 0 0
PED: 0 BIKE: 0
PM Peak Hour Summary
PED: 5 BIKE: 0
18 7 36 0 Manual Adj. 1.000
PED: 22 PED:
12 571 4
48
0
↑
0 North
2
BIKE: 373 BIKE:
81 1 1
02 9 7 4 7
PED: 6 BIKE: 1
Count Basics
Start Date: Tuesday, August 5, 2025
Total Number of Hours Counted: 6
2nd Street
66
83
149
0
0
0
0
1,097
386 456
Weekday
Non-Holiday
All Motor Vehicles
641
Main Street
61
31
TOTAL ENTERING VOLUME
1,171
2nd Street
0
Main Street
0
0
508
TOTAL ENTERING VOLUME
Main Street
618
PM PEAK HOUR 2nd Street
4:15-5:15pm 92
1,004
Main Street
0
0
0
0 0
0
MD PEAK HOUR
141
2nd Street
2nd Street
52
89
Intersection Traffic Volume Report
Wednesday, August 6, 2025
N/A
Tuesday, August 5, 2025
Schools Not in Session
No Special Events
AM PEAK HOUR 2nd Street TOTAL ENTERING VOLUME
7:15-8:15am 81 838
52
29
249
Main Street
266
Main Street
680
774
431
Page 98 of 230
Count Basics Page 3 of 13
Peak Hour Volume Summary
Main Street & 2nd Street
Peak Hour Volumes, Truck Percentages, and PHFs
AM Peak Hour 2nd Street Main Street 2nd Street Main Street
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals
7:15 AM 4 0 12 0 16 3 43 4 0 50 13 2 7 0 22 1 105 3 0 109 197
7:30 AM 1 0 8 0 9 4 58 7 0 69 17 1 3 0 21 7 101 3 0 111 210
7:45 AM 0 2 14 0 16 6 67 11 0 84 21 2 6 0 29 5 95 3 0 103 232
8:00 AM 4 0 7 0 11 1 54 8 0 63 14 1 2 0 17 7 101 0 0 108 199
Peak Hour Volume 9 2 41 0 52 14 222 30 0 266 65 6 18 0 89 20 402 9 0 431 838
Rounded Hourly Volume 10 0 40 0 50 15 220 30 0 265 65 5 20 0 90 20 400 10 0 430 835
% Single Unit Trucks 11.1 0.0 0.0 0.0 1.9 0.0 8.1 0.0 0.0 6.8 0.0 16.7 5.6 0. 0 2.2 0.0 8.5 0.0 0.0 7.9 6.6
% Heavy Trucks 0.0 0.0 0.0 0.0 0.0 0.0 1.8 6.7 0.0 2.3 0.0 0.0 0.0 0.0 0.0 5.0 0 .2 0.0 0.0 0.5 1.0
% Trucks (Total) 11.1 0.0 0.0 0.0 1.9 0.0 9.9 6.7 0.0 9.0 0.0 16.7 5.6 0.0 2.2 5.0 8.7 0.0 0.0 8.4 7.5
Peak Hour Factor (PHF) 0.56 0.25 0.73 0.00 0.81 0.58 0.83 0.68 0.00 0.79 0 .77 0.75 0.64 0.00 0.77 0.71 0.96 0.75 0.00 0.97 0.90
MD Peak Hour 2nd Street Main Street 2nd Street Main Street
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Peak Hour Volume 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Rounded Hourly Volume 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
% Single Unit Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0 0.0 0.0
% Heavy Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0
% Trucks (Total) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0 0.0 0.0
Peak Hour Factor (PHF) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 .00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PM Peak Hour 2nd Street Main Street 2nd Street Main Street
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals
4:15 PM 4 3 7 0 14 7 143 9 0 159 14 1 5 0 20 2 92 0 0 94 287
4:30 PM 7 2 10 0 19 8 144 16 0 168 13 1 10 0 24 6 110 1 0 117 328
4:45 PM 4 1 8 0 13 2 125 15 0 142 10 4 9 0 23 3 78 0 0 81 259
5:00 PM 3 1 11 0 15 5 159 8 0 172 10 1 5 0 16 0 93 1 0 94 297
Peak Hour Volume 18 7 36 0 61 22 571 48 0 641 47 7 29 0 83 11 373 2 0 386 1171
Rounded Hourly Volume 20 5 35 0 60 20 570 50 0 640 45 5 30 0 80 10 375 0 0 385 1165
% Single Unit Trucks 0.0 0.0 0.0 0.0 0.0 4.5 4.4 0.0 0.0 4.1 0.0 0.0 3.4 0.0 1 .2 0.0 3.2 50.0 0.0 3.4 3.4
% Heavy Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0 .5 0.0 0.0 0.5 0.4
% Trucks (Total) 0.0 0.0 0.0 0.0 0.0 4.5 4.9 0.0 0.0 4.5 0.0 0.0 3.4 0.0 1.2 0. 0 3.8 50.0 0.0 3.9 3.8
Peak Hour Factor (PHF) 0.64 0.58 0.82 0.00 0.80 0.69 0.90 0.75 0.00 0.93 0 .84 0.44 0.72 0.00 0.86 0.46 0.85 0.50 0.00 0.82 0.89
Peak Hour Pedestrian and Bicyclist Volumes
Pedestrians and Bicyclists Total
Ped &
2nd Street Main Street 2nd Street Main Street Bike
15-Minute Start Time Total Total Total Total Volume
7:15 AM 0140 5
7:30 AM 0221 5
7:45 AM 2001 3
8:00 AM 0042 6
Total 2 3 10 4 19
12:00 PM 0000 0
12:15 PM 0000 0
12:30 PM 0000 0
12:45 PM 0000 0
Total 0000 0
4:15 PM 2106 9
4:30 PM 0225 9
4:45 PM 3006 9
5:00 PM 0253 1 0
Total 5 5 7 20 37
All Motor Vehicles
From West
From South From West
Weekday
West Approach
From South
From South From West
Non-Holiday
Schools Not in Session
No Special Events
Start Date: Tuesday, August 5, 2025
Total Number of Hours Counted: 6
AM
2
0
2
0
0
0
Bicyclist Pedestrian
Crossing
From North From East
From North From East
From East
Bicyclist
Wednesday, August 6, 2025
N/A
0
0
0
Pedestrian
0
0
Bicyclist
40
Pedestrian Bicyclist
CrossingCrossing
South Approach
Pedestrian
AM Peak HourMidday (MD) Peak Hour
From North
Tuesday, August 5, 2025
Crossing
North Approach
PM Peak Hour
East Approach
91
0
00
10
11
21
0
00 0000 0
00
01
10
20
31
40
11
00
00 0000 00
MD
00 00 00 00
00 00 00 0
0
00 0000 00
02
PM
20 1
30 0
50 4
00 2
00 1
Intersection Traffic Volume Report
1
000
816 1 1 2
41 21
3
4
20 50
3
0
00
Page 99 of 230
Count Basics Page 4 of 13
Hourly Volume Summary - Motor Vehicle Data
Main Street & 2nd Street
One-Hour Motor Vehicle Data
One-Hour Total
Time Period 2nd Street Main Street 2nd Street Main Street Vehicle
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume E/W N/S
6:00 AM 6 1 12 0 19 2 126 10 0 138 26 0 6 0 32 6 258 3 0 267 456 405 51
7:00 AM 6 3 39 0 48 14 211 26 0 251 64 5 19 0 88 13 388 14 0 415 802 666 136
8:00 AM 7 2 26 0 35 11 245 38 0 294 49 4 11 0 64 18 361 2 0 381 774 675 99
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 10 8 30 0 48 15 394 31 0 440 39 2 22 0 63 20 318 5 0 343 894 783 111
4:00 PM 21 9 37 0 67 23 545 49 0 617 52 8 35 0 95 15 361 3 0 379 1158 996 162
5:00 PM 14 8 36 0 58 18 518 54 0 590 37 4 15 0 56 22 367 8 0 397 1101 987 114
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
64 31 180 0 275 83 2039 208 0 2330 267 23 108 0 398 94 2053 35 0 2182 5185 4512 673
Volume Totals
Non-Holiday
DirectionalFrom South From West
Weekday
PM
Start Date: Tuesday, August 5, 2025
Total Number of Hours Counted: 6
All Motor Vehicles
Schools Not in Session
No Special Events
From East
Intersection Traffic Volume Report
Totals
AMMD
From North
0
100
200
300
400
500
600
700
0
200
400
600
800
1000
1200
1400
6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM
Entering Vehicle Volume By Approach (Line Chart)
Total Entering Vehicle Volume (Bar Chart)
One-Hour Time Period Start Time
(For example, 6am represents volumes from 6am to 7am)
Graphical Summary of Hourly Volumes
All Motor Vehicles Southbound Approach Westbound Approach
Northbound Approach Eastbound Approach
Page 100 of 230
Count Basics Page 5 of 13
15-Minute Motor Vehicle Data
Main Street & 2nd Street
15-Minute Motor Vehicle Data
15-Minute
Time Period 2nd Street Main Street 2nd Street Main Street 15-Min Hour ly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum PHF
6:00 AM 0 0 1 0 1 0 20 1 0 21 5 0 1 0 6 1 41 0 0 42 70 456 0.78
6:15 AM 0 1 2 0 3 0 39 3 0 42 5 0 1 0 6 0 56 1 0 57 108 549 0.84
6:30 AM 5 0 6 0 11 0 30 3 0 33 5 0 3 0 8 1 79 0 0 80 132 638 0.81
6:45 AM 1 0 3 0 4 2 37 3 0 42 11 0 1 0 12 4 82 2 0 88 146 716 0.85
7:00 AM 1 1 5 0 7 1 43 4 0 48 13 0 3 0 16 0 87 5 0 92 163 802 0.86
7:15 AM 4 0 12 0 16 3 43 4 0 50 13 2 7 0 22 1 105 3 0 109 197 838 0.90
7:30 AM 1 0 8 0 9 4 58 7 0 69 17 1 3 0 21 7 101 3 0 111 210 832 0.90
7:45 AM 0 2 14 0 16 6 67 11 0 84 21 2 6 0 29 5 95 3 0 103 232 811 0.87
8:00 AM 4 0 7 0 11 1 54 8 0 63 14 1 2 0 17 7 101 0 0 108 199 774 0.97
8:15 AM 2 0 12 0 14 1 56 11 0 68 15 1 1 0 17 5 86 1 0 92 191
8:30 AM 1 0 3 0 4 4 74 12 0 90 10 1 2 0 13 5 77 0 0 82 189
8:45 AM 0 2 4 0 6 5 61 7 0 73 10 1 6 0 17 1 97 1 0 99 195
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 3 4 7 0 14 4 94 5 0 103 9 0 6 0 15 6 70 1 0 77 209 894 0.93
3:15 PM 2 2 7 0 11 6 101 5 0 112 10 1 5 0 16 6 84 1 0 91 230 969 0.85
3:30 PM 3 0 6 0 9 2 84 8 0 94 10 1 5 0 16 5 89 2 0 96 215 1026 0.89
3:45 PM 2 2 10 0 14 3 115 13 0 131 10 0 6 0 16 3 75 1 0 79 240 1139 0.87
4:00 PM 6 3 12 0 21 6 133 9 0 148 15 2 11 0 28 4 81 2 0 87 284 1158 0.88
4:15 PM 4 3 7 0 14 7 143 9 0 159 14 1 5 0 20 2 92 0 0 94 287 1171 0.89
4:30 PM 7 2 10 0 19 8 144 16 0 168 13 1 10 0 24 6 110 1 0 117 328 1164 0.89
4:45 PM 4 1 8 0 13 2 125 15 0 142 10 4 9 0 23 3 78 0 0 81 259 1118 0.94
5:00 PM 3 1 11 0 15 5 159 8 0 172 10 1 5 0 16 0 93 1 0 94 297 1101 0.93
5:15 PM 3 1 9 0 13 4 114 10 0 128 11 0 2 0 13 6 118 2 0 126 280
5:30 PM 7 3 9 0 19 3 134 19 0 156 7 2 3 0 12 11 83 1 0 95 282
5:45 PM 1 3 7 0 11 6 111 17 0 134 9 1 5 0 15 5 73 4 0 82 242
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
64 31 180 0 275 83 2039 208 0 2330 267 23 108 0 398 94 2053 35 0 2182 5185
Peak Hour All Vehicle Volume Summary
Hourly Total
Time Period 2nd Street Main Street 2nd Street Main Street Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume PHF
AM 7:15 AM 9 2 41 0 52 14 222 30 0 266 65 6 18 0 89 20 402 9 0 431 838 0.90
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 18 7 36 0 61 22 571 48 0 641 47 7 29 0 83 11 373 2 0 386 1171 0.89
From North From East From South From West
From West
Tuesday, August 5, 2025
Total Number of Hours Counted: 6
All Motor Vehicles
AM Peak Period
Weekday Schools Not in Session
Non-Holiday No Special Events
Start Date:
From North From East From South
Intersection Traffic Volume Report
Midday Peak PeriodPM Peak Period
Totals
Page 101 of 230
Count Basics Page 6 of 13
15-Minute Automobile Data
Main Street & 2nd Street
15-Minute Automobile Data
15-Minute
Time Period 2nd Street Main Street 2nd Street Main Street 15-Min Hour ly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum
6:00 AM 0 0 1 0 1 0 19 1 0 20 5 0 1 0 6 1 40 0 0 41 68 432
6:15 AM 0 0 2 0 2 0 38 3 0 41 5 0 1 0 6 0 50 1 0 51 100 519
6:30 AM 5 0 6 0 11 0 27 3 0 30 5 0 2 0 7 1 71 0 0 72 120 596
6:45 AM 1 0 3 0 4 2 36 3 0 41 11 0 1 0 12 4 81 2 0 87 144 672
7:00 AM 1 1 5 0 7 1 40 4 0 45 13 0 3 0 16 0 82 5 0 87 155 746
7:15 AM 4 0 12 0 16 3 42 3 0 48 13 1 6 0 20 1 89 3 0 93 177 775
7:30 AM 1 0 8 0 9 4 49 7 0 60 17 1 3 0 21 6 97 3 0 106 196 779
7:45 AM 0 2 14 0 16 6 59 11 0 76 21 2 6 0 29 5 89 3 0 97 218 766
8:00 AM 3 0 7 0 10 1 50 7 0 58 14 1 2 0 17 7 92 0 0 99 184 733
8:15 AM 2 0 12 0 14 1 50 11 0 62 15 1 1 0 17 5 82 1 0 88 181
8:30 AM 1 0 3 0 4 4 69 12 0 85 10 1 2 0 13 5 76 0 0 81 183
8:45 AM 0 2 4 0 6 5 58 7 0 70 9 1 6 0 16 1 91 1 0 93 185
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 3 4 7 0 14 4 89 5 0 98 9 0 6 0 15 5 68 1 0 74 201 855
3:15 PM 2 2 6 0 10 6 98 5 0 109 10 1 5 0 16 6 80 1 0 87 222 919
3:30 PM 3 0 5 0 8 1 79 8 0 88 10 1 5 0 16 5 89 2 0 96 208 974
3:45 PM 2 2 10 0 14 3 105 11 0 119 9 0 6 0 15 3 72 1 0 76 224 1078
4:00 PM 5 3 12 0 20 6 119 9 0 134 15 2 11 0 28 4 77 2 0 83 265 1104
4:15 PM 4 3 7 0 14 6 136 9 0 151 14 1 5 0 20 2 90 0 0 92 277 1126
4:30 PM 7 2 10 0 19 8 134 16 0 158 13 1 10 0 24 6 104 1 0 111 312 1125
4:45 PM 4 1 8 0 13 2 119 15 0 136 10 4 9 0 23 3 75 0 0 78 250 1091
5:00 PM 3 1 11 0 15 5 154 8 0 167 10 1 4 0 15 0 90 0 0 90 287 1078
5:15 PM 3 1 9 0 13 4 112 10 0 126 11 0 2 0 13 6 116 2 0 124 276
5:30 PM 7 3 9 0 19 3 131 19 0 153 7 2 3 0 12 11 82 1 0 94 278
5:45 PM 1 3 7 0 11 6 109 17 0 132 9 1 5 0 15 5 70 4 0 79 237
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
62 30 178 0 270 81 1922 204 0 2207 265 22 105 0 392 92 1953 34 0 2079 4948
Peak Hour Automobile Volume Summary
Hourly Total
Time Period 2nd Street Main Street 2nd Street Main Street Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume
AM 7:15 AM 8 2 41 0 51 14 200 28 0 242 65 5 17 0 87 19 367 9 0 395 775
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 18 7 36 0 61 21 543 48 0 612 47 7 28 0 82 11 359 1 0 371 1126
From North From East From South From West
From South From West
PM Peak Period
Totals
AM Peak PeriodMidday Peak Period
From North From East
Automobiles (Cars, Light Trucks, & Motorcycles)
Intersection Traffic Volume Report Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Weekday Schools Not in Session
Non-Holiday No Special Events
Start Date:
Page 102 of 230
Count Basics Page 7 of 13
15-Minute Single Unit (SU) Truck & Bus Data
Main Street & 2nd Street
15-Minute Single Unit (SU) Truck & Bus Data
15-Minute
Time Period 2nd Street Main Street 2nd Street Main Street 15-Min Hour ly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 19
6:15 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 4 0 0 4 5 22
6:30 AM 0 0 0 0 0 0 3 0 0 3 0 0 1 0 1 0 8 0 0 8 12 35
6:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 36
7:00 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 3 0 0 3 4 47
7:15 AM 0 0 0 0 0 0 1 0 0 1 0 1 1 0 2 0 15 0 0 15 18 55
7:30 AM 0 0 0 0 0 0 9 0 0 9 0 0 0 0 0 0 4 0 0 4 13 45
7:45 AM 0 0 0 0 0 0 6 0 0 6 0 0 0 0 0 0 6 0 0 6 12 37
8:00 AM 1 0 0 0 1 0 2 0 0 2 0 0 0 0 0 0 9 0 0 9 12 34
8:15 AM 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 4 0 0 4 8
8:30 AM 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 1 0 0 1 5
8:45 AM 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 6 0 0 6 9
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 1 2 0 0 3 7 34
3:15 PM 0 0 1 0 1 0 3 0 0 3 0 0 0 0 0 0 3 0 0 3 7 44
3:30 PM 0 0 1 0 1 1 4 0 0 5 0 0 0 0 0 0 0 0 0 0 6 47
3:45 PM 0 0 0 0 0 0 8 2 0 10 1 0 0 0 1 0 3 0 0 3 14 55
4:00 PM 1 0 0 0 1 0 13 0 0 13 0 0 0 0 0 0 3 0 0 3 17 48
4:15 PM 0 0 0 0 0 1 7 0 0 8 0 0 0 0 0 0 2 0 0 2 10 40
4:30 PM 0 0 0 0 0 0 8 0 0 8 0 0 0 0 0 0 6 0 0 6 14 32
4:45 PM 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 0 2 0 0 2 7 22
5:00 PM 0 0 0 0 0 0 5 0 0 5 0 0 1 0 1 0 2 1 0 3 9 19
5:15 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2
5:30 PM 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 1 0 0 1 4
5:45 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 2 0 0 2 4
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2 020 42 9 7201 0 11 130 51 8 910 9 12 0 1
SU Truck %age:
3.1% 0.0% 1.1% 0.0% 1.5% 2.4% 4.8% 1.0% 0.0% 4.3% 0.4% 4.3% 2.8% 0.0% 1.3% 1.1 % 4.3% 2.9% 0.0% 4.2% 3.9%
Peak Hour Single Unit (SU) Truck & Buses Volume Summary
Hourly Total
Time Period 2nd Street Main Street 2nd Street Main Street Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume
AM 7:15 AM 1 0 0 0 1 0 18 0 0 18 0 1 1 0 2 0 34 0 0 34 55
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 0 0 0 0 0 1 25 0 0 26 0 0 1 0 1 0 12 1 0 13 40
From North From East From South From West
From South From West
PM Peak Period
Totals
AM Peak PeriodMidday Peak Period
From North From East
Single Unit (SU) Trucks & Buses
Intersection Traffic Volume Report Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Weekday Schools Not in Session
Non-Holiday No Special Events
Start Date:
Page 103 of 230
Count Basics Page 8 of 13
15-Minute Semi-Truck Data
Main Street & 2nd Street
15-Minute Semi-Truck Data
15-Minute
Time Period 2nd Street Main Street 2nd Street Main Street 15-Min Hour ly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum
6:00 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 5
6:15 AM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 3 8
6:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7
6:45 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 8
7:00 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 2 0 0 2 4 9
7:15 AM 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 1 0 0 1 2 8
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 1 8
7:45 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 2 8
8:00 AM 0 0 0 0 0 0 2 1 0 3 0 0 0 0 0 0 0 0 0 0 3 7
8:15 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 2
8:30 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1
8:45 AM 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 1
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 5
3:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 6
3:30 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 5
3:45 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 2 6
4:00 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 6
4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5
4:30 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 2 7
4:45 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 5
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 4
5:15 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 100 10 2 020 2 21 000 11 1 100 1 2 3 6
Semi Truck %age: 0.0% 3.2% 0.0% 0.0% 0.4% 0.0% 1.0% 1.0% 0.0% 0.9% 0.4% 0.0% 0.0% 0.0% 0.3% 1.1 % 0.5% 0.0% 0.0% 0.5% 0.7%
Peak Hour Semi-Truck Volume Summary
Hourly Total
Time Period 2nd Street Main Street 2nd Street Main Street Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume
AM 7:15 AM 0 0 0 0 0 0 4 2 0 6 0 0 0 0 0 1 1 0 0 2 8
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 2 0 0 2 5
From North From East From South From West
From WestFrom East From South
PM Peak Period
Totals
AM Peak PeriodMidday Peak Period
From North
Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Semi-Trucks
Weekday Schools Not in Session
Non-Holiday No Special Events
Start Date:
Intersection Traffic Volume Report
Page 104 of 230
Count Basics Page 9 of 13
15-Minute Heavy Vehicle Data
Main Street & 2nd Street
15-Minute Heavy Vehicle Data
15-Minute
Time Period 2nd Street Main Street 2nd Street Main Street 15-Min Hour ly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum
6:00 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 24
6:15 AM 0 1 0 0 1 0 1 0 0 1 0 0 0 0 0 0 6 0 0 6 8 30
6:30 AM 0 0 0 0 0 0 3 0 0 3 0 0 1 0 1 0 8 0 0 8 12 42
6:45 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 44
7:00 AM 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 5 0 0 5 8 56
7:15 AM 0 0 0 0 0 0 1 1 0 2 0 1 1 0 2 0 16 0 0 16 20 63
7:30 AM 0 0 0 0 0 0 9 0 0 9 0 0 0 0 0 1 4 0 0 5 14 53
7:45 AM 0 0 0 0 0 0 8 0 0 8 0 0 0 0 0 0 6 0 0 6 14 45
8:00 AM 1 0 0 0 1 0 4 1 0 5 0 0 0 0 0 0 9 0 0 9 15 41
8:15 AM 0 0 0 0 0 0 6 0 0 6 0 0 0 0 0 0 4 0 0 4 10
8:30 AM 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 0 1 0 0 1 6
8:45 AM 0 0 0 0 0 0 3 0 0 3 1 0 0 0 1 0 6 0 0 6 10
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 1 2 0 0 3 8 39
3:15 PM 0 0 1 0 1 0 3 0 0 3 0 0 0 0 0 0 4 0 0 4 8 50
3:30 PM 0 0 1 0 1 1 5 0 0 6 0 0 0 0 0 0 0 0 0 0 7 52
3:45 PM 0 0 0 0 0 0 10 2 0 12 1 0 0 0 1 0 3 0 0 3 16 61
4:00 PM 1 0 0 0 1 0 14 0 0 14 0 0 0 0 0 0 4 0 0 4 19 54
4:15 PM 0 0 0 0 0 1 7 0 0 8 0 0 0 0 0 0 2 0 0 2 10 45
4:30 PM 0 0 0 0 0 0 10 0 0 10 0 0 0 0 0 0 6 0 0 6 16 39
4:45 PM 0 0 0 0 0 0 6 0 0 6 0 0 0 0 0 0 3 0 0 3 9 27
5:00 PM 0 0 0 0 0 0 5 0 0 5 0 0 1 0 1 0 3 1 0 4 10 23
5:15 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 2 0 0 2 4
5:30 PM 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 1 0 0 1 4
5:45 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 3 0 0 3 5
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2 1 2 0 5 2 117 4 0 123 2 1 3 0 6 2 100 1 0 103 237
Total Truck %age: 3.1% 3.2% 1.1% 0.0% 1.8% 2.4% 5.7% 1.9% 0.0% 5.3% 0.7% 4.3% 2.8% 0.0% 1.5% 2.1 % 4.9% 2.9% 0.0% 4.7% 4.6%
Peak Hour Heavy Vehicle Volume Summary
Hourly Total
Time Period 2nd Street Main Street 2nd Street Main Street Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume
AM 7:15 AM 1 0 0 0 1 0 22 2 0 24 0 1 1 0 2 1 35 0 0 36 63
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 0 0 0 0 0 1 28 0 0 29 0 0 1 0 1 0 14 1 0 15 45
From North From East From South From West
From South From West
PM Peak Period
Totals
AM Peak PeriodMidday Peak Period
From North From East
Heavy Vehicles (Single-Unit Trucks, Buses & Semi-Trucks)
Intersection Traffic Volume Report Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Weekday Schools Not in Session
Non-Holiday No Special Events
Start Date:
Page 105 of 230
Count Basics Page 10 of 13
15-Minute Heavy Vehicle Percentages
Main Street & 2nd Street
15-Minute Heavy Vehicle Percentages
Total Hourly
15-Minute Heavy Heavy
Time Period 2nd Street Main Street 2nd Street Main Street Vehicle Veh icle
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Percent Percent
6:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 5.0 0.0 0.0 4.8 0.0 0.0 0.0 0.0 0.0 0.0 2.4 0.0 0. 0 2.4 2.9 5.3
6:15 AM 0.0 100.0 0.0 0.0 33.3 0.0 2.6 0.0 0.0 2.4 0.0 0.0 0.0 0.0 0.0 0.0 10.7 0 .0 0.0 10.5 7.4 5.5
6:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 10.0 0.0 0.0 9.1 0.0 0.0 33.3 0.0 12.5 0.0 10.1 0 .0 0.0 10.0 9.1 6.6
6:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 2.7 0.0 0.0 2.4 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0 0. 0 1.1 1.4 6.1
7:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 7.0 0.0 0.0 6.3 0.0 0.0 0.0 0.0 0.0 0.0 5.7 0.0 0. 0 5.4 4.9 7.0
7:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 2.3 25.0 0.0 4.0 0.0 50.0 14.3 0.0 9.1 0.0 15.2 0 .0 0.0 14.7 10.2 7.5
7:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 15.5 0.0 0.0 13.0 0.0 0.0 0.0 0.0 0.0 14.3 4.0 0. 0 0.0 4.5 6.7 6.4
7:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 11.9 0.0 0.0 9.5 0.0 0.0 0.0 0.0 0.0 0.0 6.3 0.0 0 .0 5.8 6.0 5.5
8:00 AM 25.0 0.0 0.0 0.0 9.1 0.0 7.4 12.5 0.0 7.9 0.0 0.0 0.0 0.0 0.0 0.0 8.9 0.0 0.0 8.3 7.5 5.3
8:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 10.7 0.0 0.0 8.8 0.0 0.0 0.0 0.0 0.0 0.0 4.7 0.0 0 .0 4.3 5.2
8:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 6.8 0.0 0.0 5.6 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.0 0. 0 1.2 3.2
8:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 4.9 0.0 0.0 4.1 10.0 0.0 0.0 0.0 5.9 0.0 6.2 0.0 0 .0 6.1 5.1
9:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
10:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
10:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
10:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
10:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
11:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
11:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
11:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
11:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
12:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
12:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
12:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
12:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
1:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
1:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
1:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
1:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
2:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
2:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
2:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
2:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
3:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 5.3 0.0 0.0 4.9 0.0 0.0 0.0 0.0 0.0 16.7 2.9 0.0 0 .0 3.9 3.8 4.4
3:15 PM 0.0 0.0 14.3 0.0 9.1 0.0 3.0 0.0 0.0 2.7 0.0 0.0 0.0 0.0 0.0 0.0 4.8 0.0 0 .0 4.4 3.5 5.2
3:30 PM 0.0 0.0 16.7 0.0 11.1 50.0 6.0 0.0 0.0 6.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 3.3 5.1
3:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 8.7 15.4 0.0 9.2 10.0 0.0 0.0 0.0 6.3 0.0 4.0 0.0 0.0 3.8 6.7 5.4
4:00 PM 16.7 0.0 0.0 0.0 4.8 0.0 10.5 0.0 0.0 9.5 0.0 0.0 0.0 0.0 0.0 0.0 4.9 0.0 0.0 4.6 6.7 4.7
4:15 PM 0.0 0.0 0.0 0.0 0.0 14.3 4.9 0.0 0.0 5.0 0.0 0.0 0.0 0.0 0.0 0.0 2.2 0.0 0 .0 2.1 3.5 3.8
4:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 6.9 0.0 0.0 6.0 0.0 0.0 0.0 0.0 0.0 0.0 5.5 0.0 0. 0 5.1 4.9 3.4
4:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 4.8 0.0 0.0 4.2 0.0 0.0 0.0 0.0 0.0 0.0 3.8 0.0 0. 0 3.7 3.5 2.4
5:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 3.1 0.0 0.0 2.9 0.0 0.0 20.0 0.0 6.3 0.0 3.2 100. 0 0.0 4.3 3.4 2.1
5:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 1.8 0.0 0.0 1.6 0.0 0.0 0.0 0.0 0.0 0.0 1.7 0.0 0. 0 1.6 1.4
5:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 2.2 0.0 0.0 1.9 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0 0. 0 1.1 1.4
5:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 1.8 0.0 0.0 1.5 0.0 0.0 0.0 0.0 0.0 0.0 4.1 0.0 0. 0 3.7 2.1
6:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
6:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
6:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
6:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
7:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
7:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
7:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
7:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
8:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
8:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
8:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
8:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
3.1 3.2 1.1 0.0 1.8 2.4 5.7 1.9 0.0 5.3 0.7 4.3 2.8 0.0 1.5 2.1 4.9 2.9 0.0 4.7 4.6
Semi Truck Percentage: 0.6943
Peak Hour Heavy Vehicle Percentages Summary
Hourly
Hourly Heavy
Time Period 2nd Street Main Street 2nd Street Main Street Vehicle
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Percent
AM 7:15 AM 11.1 0.0 0.0 0.0 1.9 0.0 9.9 6.7 0.0 9.0 0.0 16.7 5.6 0.0 2.2 5.0 8.7 0.0 0.0 8.4 7.5
MD 12:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
PM 4:15 PM 0.0 0.0 0.0 0.0 0.0 4.5 4.9 0.0 0.0 4.5 0.0 0.0 3.4 0.0 1.2 0.0 3.8 50.0 0 .0 3.9 3.8
From North From East From South From West
From South From WestFrom East
Intersection Traffic Volume Report Start Date: Tuesday, August 5, 2025
Total Number of Hours Counted: 6
PM Peak Period
Totals
AM Peak PeriodMidday Peak Period
From North
%
Weekday Schools Not in Session
Non-Holiday
Heavy Vehicles (Single-Unit Trucks, Buses & Semi-Trucks)
No Special Events
Page 106 of 230
Page 11 of 13
15-Minute Pedestrian and Bicyclist Data
Main Street & 2nd Street
15-Minute Pedestrian and Bicyclist Data
15-Minute
Time Period 2nd Street Main Street 2nd Street Main Street 15-Min Hour ly
Start Time Total Total Total Total Totals Sum
6:00 AM 0020 2 9
6:15 AM 0030 3 9
6:30 AM 0010 1 1 1
6:45 AM 2010 3 1 5
7:00 AM 0011 2 1 5
7:15 AM 0140 5 1 9
7:30 AM 0221 5 2 4
7:45 AM 2001 3 3 3
8:00 AM 0042 6 4 3
8:15 AM 0226 1 0
8:30 AM 1337 1 4
8:45 AM 0436 1 3
9:00 AM 0000 0
9:15 AM 0000 0
9:30 AM 0000 0
9:45 AM 0000 0
10:00 AM 0000 0
10:15 AM 0000 0
10:30 AM 0000 0
10:45 AM 0000 0
11:00 AM 0000 0
11:15 AM 0000 0
11:30 AM 0000 0
11:45 AM 0000 0
12:00 PM 0000 0
12:15 PM 0000 0
12:30 PM 0000 0
12:45 PM 0000 0
1:00 PM 0000 0
1:15 PM 0000 0
1:30 PM 0000 0
1:45 PM 0000 0
2:00 PM 0000 0
2:15 PM 0000 0
2:30 PM 0000 0
2:45 PM 0000 0
3:00 PM 9 8 13 2 32 102
3:15 PM 13 4 5 3 25 85
3:30 PM 9646 2 5 6 9
3:45 PM 5384 2 0 5 3
4:00 PM 3255 1 5 4 2
4:15 PM 2106 9 3 7
4:30 PM 0225 9 5 6
4:45 PM 3006 9 6 3
5:00 PM 0253 1 0 6 5
5:15 PM 13 8 2 5 28
5:30 PM 3445 1 6
5:45 PM 3224 1 1
6:00 PM 0000 0
6:15 PM 0000 0
6:30 PM 0000 0
6:45 PM
0000 0
7:00 PM 0000 0
7:15 PM 0000 0
7:30 PM 0000 0
7:45 PM 0000 0
8:00 PM 0000 0
8:15 PM 0000 0
8:30 PM 0000 0
8:45 PM 0000 0
9:00 PM 0000 0
9:15 PM 0000 0
9:30 PM 0000 0
9:45 PM 0000 0
68 54 76 78 276
Special Pedestrians
Pedestrian Type
Other (None)
Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Start Date:
Count Basics
Unknown
West Approach
00
Pedestrians and Bicyclists
00 00
41
33
2
00 00 0
0
00
00 00
00 00 00
00
00
00
Crossing
0
00 00
00 0
00 00
00 000
Crossing Crossing
0
00
North Approach East Approach South Approach
00
000
00 00 00
00
00 00 0
00 00 00
PM Peak Period
00 0
0
0
0
00 0
30 20 20
13 0
00
00
00
4
00 00 00 00
00 00 00
00 0 00
00 00 00
00 00 00 00
0
30 40 40 50
80 20
01 14 12 1
30 00 00
4
00 20 20 50
20 10 00
40
30 02 50 50
41 21 53
12
54 60 40 42
1 1 24 05 0
00
90 71 1 3 0 20
00 00 00
00
00 00 00 00
00 00 00
00
00 00 00 00
00 00 00
00
00
00 00 00 00
00 00 00
00
00
00 00 00
00 00 00
0
00
00
00 00 00 00
00 00 00
00
00 00 00 00
00 00 00
00
00 00 00 00
00 00 00
00
00 00 00 00
00 00 00
00
00 00 00 00
000 00
3
30 60
0
14
0
00 000
4200 20
00 04 02
2
0
0
00 11
0
00 01
00 10 40 0
01
Crossing
00 0
0
02 0
0
Pedestrian Bicyclist Pedestrian
00
0
0
0
0
00
Bicyclist
0
0
0
0
AM Peak Period
0
Midday Peak Period
2
0
0
0
0
0
0
0
03
00 0
0
0
00
4
0
1
Pedestrian Bicyclist
20
00
00
0
0
30
10
0
010
6
0
11
0
00
2
00 00
0
00 00
0
1
00 00
0
Elderly/Disabled (except wheelchai
Wheelchairs/Electric Scooters
x
x
x
x
x
x
1 or 2 A Few Several Many
Weekday Schools Not in Session
Non-Holiday No Special Events
Totals 59 9 48
None
Pre-school Children
Elementry School Age Children
Visually Impaired (white cane/help
e
59 19
Pedestrian Bicyclist
00
70
0
6
0
0
00
00
0
10
Intersection Traffic Volume Report
Page 107 of 230
Page 12 of 13
15-Minute Adult & Children Count (Manual Entry)
Main Street & 2nd Street
15-Minute Adult & Children Pedestrian Data
15-Minute
Time Period 2nd Street Main Street 2nd Street Main Street 15-Min Hour ly
Start Time Total Total Total Total Totals Sum
12:00 AM 0000 0 0
12:15 AM 0000 0 0
12:30 AM 0000 0 0
12:45 AM 0000 0 0
1:00 AM 0000 0 0
1:15 AM 0000 0 0
1:30 AM 0000 0 0
1:45 AM 0000 0 0
2:00 AM 0000 0 0
2:15 AM 0000 0 0
2:30 AM 0000 0 0
2:45 AM 0000 0 0
3:00 AM 0000 0 0
3:15 AM 0000 0 0
3:30 AM 0000 0 0
3:45 AM 0000 0 0
4:00 AM 0000 0 0
4:15 AM 0000 0 0
4:30 AM 0000 0 0
4:45 AM 0000 0 0
5:00 AM 0000 0 0
5:15 AM 0000 0 2
5:30 AM 0000 0 5
5:45 AM 0000 0 6
6:00 AM 0020 2 9
6:15 AM 0030 3 9
6:30 AM 0010 1 1 1
6:45 AM 2010 3 1 2
7:00 AM 0011 2 1 0
7:15 AM 0140 5 1 4
7:30 AM 0110 2 1 7
7:45 AM 0001 1 2 5
8:00 AM 0042 6 3 7
8:15 AM 0224 8 3 1
8:30 AM 1324 1 0 2 3
8:45 AM 0436 1 3 1 3
9:00 AM 0000 0 0
9:15 AM 0000 0 0
9:30 AM 0000 0 0
9:45 AM 0000 0 0
10:00 AM 0000 0 0
10:15 AM 0000 0 0
10:30 AM 0000 0 0
10:45 AM 0000 0 0
11:00 AM 0000 0 0
11:15 AM 0000 0 0
11:30 AM 0000 0 0
11:45 AM 0000 0 0
12:00 PM 0000 0 0
12:15 PM 0000 0 0
12:30 PM 0000 0 0
12:45 PM 0000 0 0
1:00 PM 0000 0 0
1:15 PM 0000 0 0
1:30 PM 0000 0 0
1:45 PM 0000 0 0
2:00 PM 0000 0 0
2:15 PM 0000 0 3 1
2:30 PM 0000 0 5 2
2:45 PM 0000 0 7 1
3:00 PM 9 7 13 2 31 86
3:15 PM 11 4 5 1 21 68
3:30 PM 5644 1 9 5 2
3:45 PM 4254 1 5 4 2
4:00 PM 3055 1 3 3 3
4:15 PM 2102 5 2 7
4:30 PM 0225 9 4 9
4:45 PM 3003 6 5 6
5:00 PM 0142 7 6 1
5:15 PM 13 8 2 4 27 54
5:30 PM 3445 1 6 2 7
5:45 PM 3224 1 1 1 1
6:00 PM 0000 0 0
6:15 PM 0000 0 0
6:30 PM 0000 0 0
6:45 PM 0000 0 0
7:00 PM 0000 0 0
7:15 PM 0000 0 0
7:30 PM 0000 0 0
7:45 PM 0000 0 0
8:00 PM 0000 0 0
8:15 PM 0000 0 0
8:30 PM 0000 0 0
8:45 PM 0000 0 0
9:00 PM 0000 0 0
9:15 PM 0000 0 0
9:30 PM 0000 0 0
9:45 PM 0000 0 0
10:00 PM 0000 0 0
10:15 PM 0000 0 0
10:30 PM 0000 0 0
10:45 PM 0000 0 0
11:00 PM 0000 0 0
11:15 PM 0000 0
11:30 PM 0000 0
11:45 PM 0000 0
59 48 70 59 236
Count Basics
Start Date: Tuesday, August 5, 2025 Weekday Schools Not in Session
Total Number of Hours Counted: 6 Non-Holiday No Special Events
Adults Children Adults Children Adults Children Adults Children
Adults & Children
Crossing Crossing Crossing Crossing
North Approach East Approach South Approach West Approach
0
000
0
3
20
0
10
001
1
0140
001
0
0001
011
2
0224
004
4
0436
132
0
0000
000
0
Midday Peak Period
0
0000
000
0
0
0
0000
000
0
0000
000
0
0000
000
0
0000
000
0
0000
000
PM Peak Period
000
00
000
11 4 5
0
0000
0
00
9 7 13 2
1
4
4254
564
5
2102
305
5
3003
022
2
1 3 824
014
5
3224
344
0
0000
000
0
0000
000
0
0000
000
0
0000
000
0
0000
000
0
0000
000
0
0000
000
0
0000
000
05 9 0Totals 59 0 48 0 70
0
0
0
00
00
0
0
0
0
0
0
0
0
0
0
20
AM Peak Period Pre-AM Peak Period
0000
0000
0000
0
000
0000
0000
000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0
0
0
0
0
0
0000
0000
0000
0000
Intersection Traffic Volume Report
0000
0000
Post PM Peak Period
000
Page 108 of 230
Count Basics Page 13 of 1 3
15-Minute Bicycle Turning Movement Count (Manual Entry)
Main Street & 2nd Street
15-Minute Bicycle Data
15-Minute
Time Period 2nd Street Main Street 2nd Street Main Street 15-Min Hour ly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum
12:00 AM 0000 0 0
12:15 AM 0000 0 0
12:30 AM 0000 0 0
12:45 AM 0000 0 0
1:00 AM 0000 0 0
1:15 AM 0000 0 0
1:30 AM 0000 0 0
1:45 AM 0000 0 0
2:00 AM 0000 0 0
2:15 AM 0000 0 0
2:30 AM 0000 0 0
2:45 AM 0000 0 0
3:00 AM 0000 0 0
3:15 AM 0000 0 0
3:30 AM 0000 0 0
3:45 AM 0000 0 0
4:00 AM 0000 0 0
4:15 AM 0000 0 0
4:30 AM 0000 0 0
4:45 AM 0000 0 0
5:00 AM 0000 0 0
5:15 AM 0000 0 0
5:30 AM 0000 0 0
5:45 AM 0000 0 0
6:00 AM 0000 0 0
6:15 AM 0000 0 0
6:30 AM 0000 0 0
6:45 AM 0000 0 0
7:00 AM 0000 0 0
7:15 AM 0000 0 0
7:30 AM 0000 0 0
7:45 AM 0000 0 0
8:00 AM 0000 0 0
8:15 AM 0000 0 0
8:30 AM 0000 0 0
8:45 AM 0000 0 0
9:00 AM 0000 0 0
9:15 AM 0000 0 0
9:30 AM 0000 0 0
9:45 AM 0000 0 0
10:00 AM 0000 0 0
10:15 AM 0000 0 0
10:30 AM 0000 0 0
10:45 AM 0000 0 0
11:00 AM 0000 0 0
11:15 AM 0000 0 0
11:30 AM 0000 0 0
11:45 AM 0000 0 0
12:00 PM 0000 0 0
12:15 PM 0000 0 0
12:30 PM 0000 0 0
12:45 PM 0000 0 0
1:00 PM 0000 0 0
1:15 PM 0000 0 0
1:30 PM 0000 0 0
1:45 PM 0000 0 0
2:00 PM 0000 0 0
2:15 PM 0000 0 0
2:30 PM 0000 0 0
2:45 PM 0000 0 0
3:00 PM 0000 0 0
3:15 PM 0000 0 0
3:30 PM 0000 0 0
3:45 PM 0000 0 0
4:00 PM 0000 0 0
4:15 PM 0000 0 0
4:30 PM 0000 0 0
4:45 PM 0000 0 0
5:00 PM 0000 0 0
5:15 PM 0000 0 0
5:30 PM 0000 0 0
5:45 PM 0000 0 0
6:00 PM 0000 0 0
6:15 PM 0000 0 0
6:30 PM 0000 0 0
6:45 PM 0000 0 0
7:00 PM 0000 0 0
7:15 PM 0000 0 0
7:30 PM 0000 0 0
7:45 PM 0000 0 0
8:00 PM 0000 0 0
8:15 PM 0000 0 0
8:30 PM 0000 0 0
8:45 PM 0000 0 0
9:00 PM 0000 0 0
9:15 PM 0000 0 0
9:30 PM 0000 0 0
9:45 PM 0000 0 0
10:00 PM 0000 0 0
10:15 PM 0000 0 0
10:30 PM 0000 0 0
10:45 PM 0000 0 0
11:00 PM 0000 0 0
11:15 PM 0000 0
11:30 PM 0000 0
11:45 PM 0000 0
0 000 00 000 00 000 00 000 0 0
Peak Hour Bicycle Turning Movement Volume Summary
Hourly Total
Time Period 2nd Street Main Street 2nd Street Main Street Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume
AM 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
From North From East From South From West
Post PM Peak Period AM Peak PeriodPM Peak Period
Totals
Schools Not in Session
Total Number of Hours Counted: 6 Non-Holiday No Special Events
Midday Peak Period
Bicyclists
From North
Pre-AM Peak Period
Start Date: Tuesday, August 5, 2025 Weekday
From East From South From West
Intersection Traffic Volume Report
Page 109 of 230
Count Basics Special Report
15-Minute Motor Vehicle Data (Daily & Seasonally Adjusted)
Main Street & 2nd Street
15-Minute Motor Vehicle Data
15-Minute
Time Period 2nd Street Main Street 2nd Street Main Street 15-Min Hour ly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum PHF
12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 AM 0 0 1 0 1 0 18 1 0 19 4 0 1 0 5 1 36 0 0 37 62 402 0.77
6:15 AM 0 1 2 0 3 0 34 3 0 37 4 0 1 0 5 0 49 1 0 50 95 483 0.84
6:30 AM 4 0 5 0 9 0 26 3 0 29 4 0 3 0 7 1 69 0 0 70 115 563 0.80
6:45 AM 1 0 3 0 4 2 32 3 0 37 10 0 1 0 11 4 72 2 0 78 130 634 0.85
7:00 AM 1 1 4 0 6 1 38 4 0 43 11 0 3 0 14 0 76 4 0 80 143 707 0.87
7:15 AM 4 0 11 0 15 3 38 4 0 45 11 2 6 0 19 1 92 3 0 96 175 739 0.91
7:30 AM 1 0 7 0 8 4 51 6 0 61 15 1 3 0 19 6 89 3 0 98 186 732 0.90
7:45 AM 0 2 12 0 14 5 59 10 0 74 18 2 5 0 25 4 83 3 0 90 203 714 0.88
8:00 AM 4 0 6 0 10 1 47 7 0 55 12 1 2 0 15 6 89 0 0 95 175 683 0.98
8:15 AM 2 0 11 0 13 1 49 10 0 60 13 1 1 0 15 4 75 1 0 80 168
8:30 AM 1 0 3 0 4 4 65 11 0 80 9 1 2 0 12 4 68 0 0 72 168
8:45 AM 0 2 4 0 6 4 54 6 0 64 9 1 5 0 15 1 85 1 0 87 172
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 3 4 6 0 13 4 82 4 0 90 8 0 5 0 13 5 61 1 0 67 183 786 0.93
3:15 PM 2 2 6 0 10 5 89 4 0 98 9 1 4 0 14 5 74 1 0 80 202 854 0.85
3:30 PM 3 0 5 0 8 2 74 7 0 83 9 1 4 0 14 4 78 2 0 84 189 904 0.90
3:45 PM 2 2 9 0 13 3 101 11 0 115 9 0 5 0 14 3 66 1 0 70 212 1003 0.87
4:00 PM 5 3 11 0 19 5 117 8 0 130 13 2 10 0 25 4 71 2 0 77 251 1020 0.89
4:15 PM 4 3 6 0 13 6 125 8 0 139 12 1 4 0 17 2 81 0 0 83 252 1031 0.89
4:30 PM 6 2 9 0 17 7 126 14 0 147 11 1 9 0 21 5 97 1 0 103 288 1027 0.89
4:45 PM 4 1 7 0 12 2 110 13 0 125 9 4 8 0 21 3 68 0 0 71 229 989 0.94
5:00 PM 3 1 10 0 14 4 140 7 0 151 9 1 4 0 14 0 82 1 0 83 262 972 0.93
5:15 PM 3 1 8 0 12 4 100 9 0 113 10 0 2 0 12 5 104 2 0 111 248
5:30 PM 6 3 8 0 17 3 118 17 0 138 6 2 3 0 11 10 73 1 0 84 250
5:45 PM 1 3 6 0 10 5 97 15 0 117 8 1 4 0 13 4 64 4 0 72 212
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
60 31 160 0 251 75 1790 185 0 2050 233 23 95 0 351 82 1802 34 0 1918 4570
Peak Hour All Vehicle Volume Summary
Hourly Total
Time Period 2nd Street Main Street 2nd Street Main Street Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume PHF
AM 7:15 AM 9 2 36 0 47 13 195 27 0 235 56 6 16 0 78 17 353 9 0 379 739 0.91
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 17 7 32 0 56 19 501 42 0 562 41 7 25 0 73 10 328 2 0 340 1031 0.89
From South From West
Schools Not in Session
Total Number of Hours Counted: 6 Non-Holiday No Special Events
Start Date: Tuesday, August 5, 2025 WeekdayIntersection Traffic Volume Report
All Motor Vehicles
From North From East From South From West
From East
PM Peak Period
Totals
Post PM Peak Period Midday Peak Period
From North
AM Peak Period Pre-AM Peak Period
Page 110 of 230
Version 2025.03 Page 1 of 13
Base Information, Observed (6) Hour and Estimated (24) Hour Volume Summaries
Major St: Main Street
Minor St: 3rd Street
Main Street & 3rd Street
Site Information Count Information
SW-M
↑
AM MD PM
AM MD PM
0.877 2.359
Company Name 1.000
Comments
Observed 6 Hour Volume Summary
6
PED: 47 BIKE: 0
19 1 30 0
PED: 56 PED:
48 2334 1
121
1
↑
0 North
20
BIKE: 2455 BIKE:
32 9 3
0 7 1 164
PED: 61 BIKE: 0
Estimated 24 Hour AADT
39 2 62 0
116
4831
250
2
↑
0 North
41
5082
60
Daily/Seasonal Factor 0.877 0 14 2 339
Count Expansion Factor 2.359
Manual Adjustment Factor 1.000
Total 24 Hr Expansion Factor 2.070
Special Considerations
East Leg Main Street
Holidays None
Special Events None
(1) Non-Interstate Low Truck %Count Expansion Group
Daily/Seasonal Adjustment Factor
Schools Not in Session
Count Expansion Factor
(1) Non-Interstate Low Truck %Daily/Seasonal Adjustment Group
24 HOUR AADT 263
HOUR VOLUMES 127
OBSERVED 3rd Street
5183
Count Basics
Schools Not in Session
1st Day of Count Tuesday, August 5, 2025
No Special Events
Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Start Date:
County
Intersection of:
WisDOT Region13 - Dane
Weekday
Non-Holiday
Municipality Village of Mt Horeb Hrs Counted: 06:00 AM-09:00 AM and 03:00 PM-06:00 PM
Intersection Traffic Volume Report
Roadway Names North Direction
4:15-5:15pm
4:15-5:15pm
10,685
Main Street
5485
10,842
TOTAL ENTERING VOLUME
5,238
50
5,162
Main Street
10,068
3rd Street
ESTIMATED 3rd Street
Total Entering Hourly Volume
Main Street
4,864
2504
3rd Street
313
356
669
159
5200
4885
2650
77
2512
Main Street
151
172
323
103
2360
Other (describe) None None
TOTAL ENTERING VOLUME
None
Wis DOT Daily & Seasonal Factors are final for 2012 through 2024,
and 2025 uses 2024 final factors.
None
NoneWheelchairs/electric scooters
Elderly/disabled (except wheelchairs)
Visually impaired (white cane/helper dog)
AM Peak Period
Midday Peak Period
PM Peak Period
Miovision
Miovision
Observers
Special Pedestrians Observed
None
None
Manual Adj.
Elementry school age children
Pre-school children
TADI
Mioribion
7:15-8:15am
North Leg 3rd Street
Clear and Dry
Clear and Dry
AM Peak Period
Weather
Wednesday, August 6, 2025
Wednesday, August 6, 2025
Midday Peak Period
PM Peak Period Tuesday, August 5, 2025
Peak Hours Selected for Analysis
Calculated Peak Hours
Clear and Dry
West Leg Main Street
South Leg 3rd Street 7:30-8:30am
Traffic Control Partial Stop Control
454
799 821
000000
868
1205 1091
0
0
1,000
2,000
6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM
Motor Vehicle
Volume
One-Hour Time Period Start Time (Ex: 6am represents volume from 6am to 7am)
Page 111 of 230
Page 2 of 13
Peak Hour Volume Graphical Summary
Main Street & 3rd Street
AM Peak Hour Summary
PED: 3 BIKE: 0
3 0 9 0 Manual Adj. 1.000
PED: 8 PED:
5 273 0
37
0
↑
0 North
7
BIKE: 484 BIKE:
01 3 0
01 01 2
PED: 8 BIKE: 0
Midday (MD) Peak Hour Summary
PED: 0 BIKE: 0
0 0 0 0 Manual Adj. 1.000
PED: 0 PED:
0 00
0
0
↑
0 North
0
BIKE: 0 BIKE:
00 0
00 0 0
PED: 0 BIKE: 0
PM Peak Hour Summary
PED: 4 BIKE: 0
5 0 4 0 Manual Adj. 1.000
PED: 17 PED:
10 646 0
9
1
↑
0 North
3
BIKE: 456 BIKE:
11 0
00 17 0
PED: 2 BIKE: 0
Intersection Traffic Volume Report
Wednesday, August 6, 2025
N/A
Tuesday, August 5, 2025
Schools Not in Session
No Special Events
AM PEAK HOUR 3rd Street TOTAL ENTERING VOLUME
7:15-8:15am 27 847
12
15
277
Main Street
318
Main Street
781
823
504
0 0
0
MD PEAK HOUR
63
3rd Street
3rd Street
50
13
Main Street
651
PM PEAK HOUR 3rd Street
4:15-5:15pm 30
1,111
Main Street
0
0
0
1,204
460 531
Weekday
Non-Holiday
All Motor Vehicles
673
Main Street
9
21
TOTAL ENTERING VOLUME
1,213
3rd Street
0
Main Street
0
0
505
TOTAL ENTERING VOLUME
3rd Street
10
71
81
0
0
0
0
Count Basics
Start Date: Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Page 112 of 230
Count Basics Page 3 of 13
Peak Hour Volume Summary
Main Street & 3rd Street
Peak Hour Volumes, Truck Percentages, and PHFs
AM Peak Hour 3rd Street Main Street 3rd Street Main Street
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals
7:15 AM 0 0 3 0 3 1 53 7 0 61 3 0 0 0 3 0 127 1 0 128 195
7:30 AM 2 0 2 0 4 3 63 5 0 71 5 0 0 0 5 6 118 2 0 126 206
7:45 AM 0 0 3 0 3 2 88 12 0 102 2 0 0 0 2 2 128 2 0 132 239
8:00 AM 1 0 1 0 2 2 69 13 0 84 2 0 1 0 3 5 111 2 0 118 207
Peak Hour Volume 3 0 9 0 12 8 273 37 0 318 12 0 1 0 13 13 484 7 0 504 847
Rounded Hourly Volume 5 0 10 0 15 10 275 35 0 320 10 0 0 0 10 15 485 5 0 505 850
% Single Unit Trucks 0.0 0.0 0.0 0.0 0.0 0.0 5.1 0.0 0.0 4.4 0.0 0.0 0.0 0.0 0 .0 0.0 3.9 0.0 0.0 3.8 3.9
% Heavy Trucks 0.0 0.0 0.0 0.0 0.0 0.0 1.5 0.0 0.0 1.3 0.0 0.0 100.0 0.0 7.7 0. 0 0.2 0.0 0.0 0.2 0.7
% Trucks (Total) 0.0 0.0 0.0 0.0 0.0 0.0 6.6 0.0 0.0 5.7 0.0 0.0 100.0 0.0 7.7 0.0 4.1 0.0 0.0 4.0 4.6
Peak Hour Factor (PHF) 0.37 0.00 0.75 0.00 0.75 0.67 0.78 0.71 0.00 0.78 0 .60 0.00 0.25 0.00 0.65 0.54 0.95 0.87 0.00 0.95 0.89
MD Peak Hour 3rd Street Main Street 3rd Street Main Street
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Peak Hour Volume 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Rounded Hourly Volume 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
% Single Unit Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0 0.0 0.0
% Heavy Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0
% Trucks (Total) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0 0.0 0.0
Peak Hour Factor (PHF) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 .00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PM Peak Hour 3rd Street Main Street 3rd Street Main Street
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals
4:15 PM 0 0 1 0 1 3 160 0 1 164 23 1 0 0 24 1 110 1 0 112 301
4:30 PM 2 0 1 0 3 5 168 2 0 175 24 0 0 0 24 0 138 0 0 138 340
4:45 PM 2 0 2 0 4 7 143 4 0 154 9 0 0 0 9 0 95 2 0 97 264
5:00 PM 1 0 0 0 1 2 175 3 0 180 14 0 0 0 14 0 113 0 0 113 308
Peak Hour Volume 5 0 4 0 9 17 646 9 1 673 70 1 0 0 71 1 456 3 0 460 1213
Rounded Hourly Volume 5 0 5 0 10 15 645 10 0 670 70 0 0 0 70 0 455 5 0 460 1210
% Single Unit Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 0.0 0.7 0.0 0.0 0.0 0.0 0 .0 0.0 1.1 0.0 0.0 1.1 0.8
% Heavy Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0 .4 0.0 0.0 0.4 0.3
% Trucks (Total) 0.0 0.0 0.0 0.0 0.0 0.0 1.1 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0. 0 1.5 0.0 0.0 1.5 1.2
Peak Hour Factor (PHF) 0.62 0.00 0.50 0.00 0.56 0.61 0.92 0.56 0.25 0.93 0 .73 0.25 0.00 0.00 0.74 0.25 0.83 0.37 0.00 0.83 0.89
Peak Hour Pedestrian and Bicyclist Volumes
Pedestrians and Bicyclists Total
Ped &
3rd Street Main Street 3rd Street Main Street Bike
15-Minute Start Time Total Total Total Total Volume
7:15 AM 2041 7
7:30 AM 0011 2
7:45 AM 0012 3
8:00 AM 1021 4
Total 3085 1 6
12:00 PM 0000 0
12:15 PM 0000 0
12:30 PM 0000 0
12:45 PM 0000 0
Total 0000 0
4:15 PM 2006 8
4:30 PM 0000 0
4:45 PM 1013 5
5:00 PM 1012 4
Total 4 0 2 11 17
Intersection Traffic Volume Report
0
100
102 0 1 0
10 11
3
0
00 00
0
0
00 06
PM
20 0
10 0
40 0
00 0
10 0
0
00 0000 00
00 0000 00
MD
00 00 00 00
00 00 00 00
00 0000 0
10
10
20
10
50
40
10
10
80
0
00
00
00
00
AM Peak HourMidday (MD) Peak Hour
From North
Tuesday, August 5, 2025
Crossing
North Approach
PM Peak Hour
East Approach
Pedestrian Bicyclist
CrossingCrossing
South Approach
Pedestrian
1
0
0
Pedestrian
2
0
Bicyclist
20
AM
0
0
0
0
0
3
Bicyclist Pedestrian
Crossing
From North From East
From North From East
From East
Bicyclist
Wednesday, August 6, 2025
N/A
All Motor Vehicles
From West
From South From West
Weekday
West Approach
From South
From South From West
Non-Holiday
Schools Not in Session
No Special Events
Start Date: Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Page 113 of 230
Count Basics Page 4 of 13
Hourly Volume Summary - Motor Vehicle Data
Main Street & 3rd Street
One-Hour Motor Vehicle Data
One-Hour Total
Time Period 3rd Street Main Street 3rd Street Main Street Vehicle
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume E/W N/S
6:00 AM 2 0 2 0 4 1 140 9 0 150 5 0 2 0 7 0 293 0 0 293 454 443 11
7:00 AM 4 0 11 0 15 6 249 26 0 281 13 0 0 0 13 8 477 5 0 490 799 771 28
8:00 AM 3 0 5 0 8 9 297 58 0 364 14 0 2 0 16 14 417 2 0 433 821 797 24
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 1 1 4 0 6 11 429 7 0 447 23 0 1 0 24 2 385 4 0 391 868 838 30
4:00 PM 5 0 5 0 10 19 634 9 1 663 77 1 1 0 79 2 448 3 0 453 1205 1116 89
5:00 PM 4 0 3 0 7 10 585 12 0 607 32 0 1 0 33 3 435 6 0 444 1091 1051 40
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
19 1 30 0 50 56 2334 121 1 2512 164 1 7 0 172 29 2455 20 0 2504 5238 5016 222
Intersection Traffic Volume Report
Totals
AMMD
From North
Weekday
PM
Start Date: Tuesday, August 5, 2025
Total Number of Hours Counted: 6
All Motor Vehicles
Schools Not in Session
No Special Events
From East
Volume Totals
Non-Holiday
DirectionalFrom South From West
0
100
200
300
400
500
600
700
0
200
400
600
800
1000
1200
1400
6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM
Entering Vehicle Volume By Approach (Line Chart)
Total Entering Vehicle Volume (Bar Chart)
One-Hour Time Period Start Time
(For example, 6am represents volumes from 6am to 7am)
Graphical Summary of Hourly Volumes
All Motor Vehicles Southbound Approach Westbound Approach
Northbound Approach Eastbound Approach
Page 114 of 230
Count Basics Page 5 of 13
15-Minute Motor Vehicle Data
Main Street & 3rd Street
15-Minute Motor Vehicle Data
15-Minute
Time Period 3rd Street Main Street 3rd Street Main Street 15-Min Hour ly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum PHF
6:00 AM 0 0 1 0 1 0 22 0 0 22 2 0 0 0 2 0 46 0 0 46 71 454 0.78
6:15 AM 0 0 0 0 0 1 41 0 0 42 1 0 0 0 1 0 62 0 0 62 105 542 0.85
6:30 AM 1 0 1 0 2 0 33 4 0 37 0 0 1 0 1 0 92 0 0 92 132 632 0.81
6:45 AM 1 0 0 0 1 0 44 5 0 49 2 0 1 0 3 0 93 0 0 93 146 706 0.86
7:00 AM 2 0 3 0 5 0 45 2 0 47 3 0 0 0 3 0 104 0 0 104 159 799 0.84
7:15 AM 0 0 3 0 3 1 53 7 0 61 3 0 0 0 3 0 127 1 0 128 195 847 0.89
7:30 AM 2 0 2 0 4 3 63 5 0 71 5 0 0 0 5 6 118 2 0 126 206 863 0.90
7:45 AM 0 0 3 0 3 2 88 12 0 102 2 0 0 0 2 2 128 2 0 132 239 857 0.90
8:00 AM 1 0 1 0 2 2 69 13 0 84 2 0 1 0 3 5 111 2 0 118 207 821 0.97
8:15 AM 0 0 1 0 1 3 70 18 0 91 5 0 0 0 5 2 112 0 0 114 211
8:30 AM 2 0 1 0 3 1 84 18 0 103 4 0 1 0 5 5 84 0 0 89 200
8:45 AM 0 0 2 0 2 3 74 9 0 86 3 0 0 0 3 2 110 0 0 112 203
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 0 0 3 0 3 2 104 1 0 107 7 0 1 0 8 1 86 2 0 89 207 868 0.92
3:15 PM 1 0 0 0 1 3 101 3 0 107 4 0 0 0 4 0 103 0 0 103 215 961 0.80
3:30 PM 0 0 1 0 1 3 98 1 0 102 5 0 0 0 5 1 98 2 0 101 209 1047 0.87
3:45 PM 0 1 0 0 1 3 126 2 0 131 7 0 0 0 7 0 98 0 0 98 237 1178 0.87
4:00 PM 1 0 1 0 2 4 163 3 0 170 21 0 1 0 22 1 105 0 0 106 300 1205 0.89
4:15 PM 0 0 1 0 1 3 160 0 1 164 23 1 0 0 24 1 110 1 0 112 301 1213 0.89
4:30 PM 2 0 1 0 3 5 168 2 0 175 24 0 0 0 24 0 138 0 0 138 340 1205 0.89
4:45 PM 2 0 2 0 4 7 143 4 0 154 9 0 0 0 9 0 95 2 0 97 264 1128 0.92
5:00 PM 1 0 0 0 1 2 175 3 0 180 14 0 0 0 14 0 113 0 0 113 308 1091 0.89
5:15 PM 1 0 2 0 3 2 134 3 0 139 6 0 0 0 6 2 142 1 0 145 293
5:30 PM 1 0 1 0 2 3 144 5 0 152 9 0 0 0 9 1 98 1 0 100 263
5:45 PM 1 0 0 0 1 3 132 1 0 136 3 0 1 0 4 0 82 4 0 86 227
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
19 1 30 0 50 56 2334 121 1 2512 164 1 7 0 172 29 2455 20 0 2504 5238
Peak Hour All Vehicle Volume Summary
Hourly Total
Time Period 3rd Street Main Street 3rd Street Main Street Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume PHF
AM 7:15 AM 3 0 9 0 12 8 273 37 0 318 12 0 1 0 13 13 484 7 0 504 847 0.89
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 5 0 4 0 9 17 646 9 1 673 70 1 0 0 71 1 456 3 0 460 1213 0.89
Intersection Traffic Volume Report
Midday Peak PeriodPM Peak Period
Totals
Tuesday, August 5, 2025
Total Number of Hours Counted: 6
All Motor Vehicles
AM Peak Period
Weekday Schools Not in Session
Non-Holiday No Special Events
Start Date:
From North From East From South From West
From North From East From South From West
Page 115 of 230
Count Basics Page 6 of 13
15-Minute Automobile Data
Main Street & 3rd Street
15-Minute Automobile Data
15-Minute
Time Period 3rd Street Main Street 3rd Street Main Street 15-Min Hour ly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum
6:00 AM 0 0 1 0 1 0 21 0 0 21 2 0 0 0 2 0 46 0 0 46 70 438
6:15 AM 0 0 0 0 0 1 40 0 0 41 1 0 0 0 1 0 58 0 0 58 100 519
6:30 AM 0 0 1 0 1 0 31 4 0 35 0 0 1 0 1 0 87 0 0 87 124 604
6:45 AM 1 0 0 0 1 0 43 4 0 47 2 0 1 0 3 0 93 0 0 93 144 676
7:00 AM 2 0 3 0 5 0 41 2 0 43 3 0 0 0 3 0 100 0 0 100 151 762
7:15 AM 0 0 3 0 3 1 51 7 0 59 3 0 0 0 3 0 119 1 0 120 185 808
7:30 AM 2 0 2 0 4 3 57 5 0 65 5 0 0 0 5 6 114 2 0 122 196 827
7:45 AM 0 0 3 0 3 2 82 12 0 96 2 0 0 0 2 2 125 2 0 129 230 827
8:00 AM 1 0 1 0 2 2 65 13 0 80 2 0 0 0 2 5 106 2 0 113 197 792
8:15 AM 0 0 1 0 1 3 65 18 0 86 5 0 0 0 5 2 110 0 0 112 204
8:30 AM 2 0 1 0 3 1 81 18 0 100 4 0 1 0 5 5 83 0 0 88 196
8:45 AM 0 0 2 0 2 3 72 9 0 84 3 0 0 0 3 2 104 0 0 106 195
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 0 0 3 0 3 2 99 1 0 102 7 0 0 0 7 1 84 1 0 86 198 834
3:15 PM 1 0 0 0 1 3 99 3 0 105 4 0 0 0 4 0 98 0 0 98 208 923
3:30 PM 0 0 1 0 1 3 94 1 0 98 5 0 0 0 5 1 97 2 0 100 204 1014
3:45 PM 0 0 0 0 0 3 118 2 0 123 6 0 0 0 6 0 95 0 0 95 224 1147
4:00 PM 1 0 1 0 2 4 153 3 0 160 21 0 1 0 22 1 102 0 0 103 287 1183
4:15 PM 0 0 1 0 1 3 159 0 1 163 23 1 0 0 24 1 109 1 0 111 299 1199
4:30 PM 2 0 1 0 3 5 166 2 0 173 24 0 0 0 24 0 137 0 0 137 337 1191
4:45 PM 2 0 2 0 4 7 141 4 0 152 9 0 0 0 9 0 93 2 0 95 260 1115
5:00 PM 1 0 0 0 1 2 173 3 0 178 14 0 0 0 14 0 110 0 0 110 303 1079
5:15 PM 1 0 2 0 3 2 133 3 0 138 6 0 0 0 6 2 141 1 0 144 291
5:30 PM 1 0 1 0 2 3 142 5 0 150 9 0 0 0 9 1 98 1 0 100 261
5:45 PM 1 0 0 0 1 3 131 1 0 135 3 0 1 0 4 0 80 4 0 84 224
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
18 0 30 0 48 56 2257 120 1 2434 163 1 5 0 169 29 2389 19 0 2437 5088
Peak Hour Automobile Volume Summary
Hourly Total
Time Period 3rd Street Main Street 3rd Street Main Street Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume
AM 7:15 AM 3 0 9 0 12 8 255 37 0 300 12 0 0 0 12 13 464 7 0 484 808
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 5 0 4 0 9 17 639 9 1 666 70 1 0 0 71 1 449 3 0 453 1199
Intersection Traffic Volume Report Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Weekday Schools Not in Session
Non-Holiday No Special Events
Start Date:
Automobiles (Cars, Light Trucks, & Motorcycles)
Totals
AM Peak PeriodMidday Peak Period
From North From East
PM Peak Period
From North From East From South From West
From South From West
Page 116 of 230
Count Basics Page 7 of 13
15-Minute Single Unit (SU) Truck & Bus Data
Main Street & 3rd Street
15-Minute Single Unit (SU) Truck & Bus Data
15-Minute
Time Period 3rd Street Main Street 3rd Street Main Street 15-Min Hour ly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12
6:15 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 2 0 0 2 3 16
6:30 AM 1 0 0 0 1 0 2 0 0 2 0 0 0 0 0 0 5 0 0 5 8 22
6:45 AM 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 1 24
7:00 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 2 0 0 2 4 30
7:15 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 7 0 0 7 9 33
7:30 AM 0 0 0 0 0 0 6 0 0 6 0 0 0 0 0 0 4 0 0 4 10 29
7:45 AM 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 3 0 0 3 7 22
8:00 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 5 0 0 5 7 22
8:15 AM 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 2 0 0 2 5
8:30 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 1 0 0 1 3
8:45 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 5 0 0 5 7
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 0 0 0 0 0 0 4 0 0 4 0 0 1 0 1 0 2 1 0 3 8 26
3:15 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 4 0 0 4 6 29
3:30 PM 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 1 0 0 1 4 25
3:45 PM 0 1 0 0 1 0 4 0 0 4 0 0 0 0 0 0 3 0 0 3 8 23
4:00 PM 0 0 0 0 0 0 9 0 0 9 0 0 0 0 0 0 2 0 0 2 11 17
4:15 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 10
4:30 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 8
4:45 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 8
5:00 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 2 0 0 2 4 8
5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 2
5:45 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 100 20 5 610 5 70 010 10 5 410 5 51 1 5
SU Truck %age:
5.3% 100.0% 0.0% 0.0% 4.0% 0.0% 2.4% 0.8% 0.0% 2.3% 0.0% 0.0% 14.3% 0.0% 0.6% 0.0% 2.2% 5.0% 0.0% 2.2% 2.2%
Peak Hour Single Unit (SU) Truck & Buses Volume Summary
Hourly Total
Time Period 3rd Street Main Street 3rd Street Main Street Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume
AM 7:15 AM 0 0 0 0 0 0 14 0 0 14 0 0 0 0 0 0 19 0 0 19 33
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 0 5 0 0 5 10
Intersection Traffic Volume Report Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Weekday Schools Not in Session
Non-Holiday No Special Events
Start Date:
Single Unit (SU) Trucks & Buses
Totals
AM Peak PeriodMidday Peak Period
From North From East
PM Peak Period
From North From East From South From West
From South From West
Page 117 of 230
Count Basics Page 8 of 13
15-Minute Semi-Truck Data
Main Street & 3rd Street
15-Minute Semi-Truck Data
15-Minute
Time Period 3rd Street Main Street 3rd Street Main Street 15-Min Hour ly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum
6:00 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 4
6:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 2 7
6:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6
6:45 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 6
7:00 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 2 0 0 2 4 7
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 6
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7
7:45 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 2 8
8:00 AM 0 0 0 0 0 0 2 0 0 2 0 0 1 0 1 0 0 0 0 0 3 7
8:15 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 2
8:30 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 8
3:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 9
3:30 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 8
3:45 PM 0 0 0 0 0 0 4 0 0 4 1 0 0 0 1 0 0 0 0 0 5 8
4:00 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 5
4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
4:30 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 6
4:45 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 5
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 4
5:15 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 000 00 2 100 2 11 010 20 1 200 1 2 3 5
Semi Truck %age: 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.9% 0.0% 0.0% 0.8% 0.6% 0.0% 14.3% 0.0% 1.2% 0. 0% 0.5% 0.0% 0.0% 0.5% 0.7%
Peak Hour Semi-Truck Volume Summary
Hourly Total
Time Period 3rd Street Main Street 3rd Street Main Street Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume
AM 7:15 AM 0 0 0 0 0 0 4 0 0 4 0 0 1 0 1 0 1 0 0 1 6
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 2 0 0 2 4
Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Semi-Trucks
Weekday Schools Not in Session
Non-Holiday No Special Events
Start Date:
Intersection Traffic Volume Report
PM Peak Period
Totals
AM Peak PeriodMidday Peak Period
From North
From North From East From South From West
From WestFrom East From South
Page 118 of 230
Count Basics Page 9 of 13
15-Minute Heavy Vehicle Data
Main Street & 3rd Street
15-Minute Heavy Vehicle Data
15-Minute
Time Period 3rd Street Main Street 3rd Street Main Street 15-Min Hour ly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum
6:00 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 16
6:15 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 4 0 0 4 5 23
6:30 AM 1 0 0 0 1 0 2 0 0 2 0 0 0 0 0 0 5 0 0 5 8 28
6:45 AM 0 0 0 0 0 0 1 1 0 2 0 0 0 0 0 0 0 0 0 0 2 30
7:00 AM 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 4 0 0 4 8 37
7:15 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 8 0 0 8 10 39
7:30 AM 0 0 0 0 0 0 6 0 0 6 0 0 0 0 0 0 4 0 0 4 10 36
7:45 AM 0 0 0 0 0 0 6 0 0 6 0 0 0 0 0 0 3 0 0 3 9 30
8:00 AM 0 0 0 0 0 0 4 0 0 4 0 0 1 0 1 0 5 0 0 5 10 29
8:15 AM 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 0 2 0 0 2 7
8:30 AM 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 1 0 0 1 4
8:45 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 6 0 0 6 8
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 0 0 0 0 0 0 5 0 0 5 0 0 1 0 1 0 2 1 0 3 9 34
3:15 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 5 0 0 5 7 38
3:30 PM 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 1 0 0 1 5 33
3:45 PM 0 1 0 0 1 0 8 0 0 8 1 0 0 0 1 0 3 0 0 3 13 31
4:00 PM 0 0 0 0 0 0 10 0 0 10 0 0 0 0 0 0 3 0 0 3 13 22
4:15 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 14
4:30 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 1 0 0 1 3 14
4:45 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 2 0 0 2 4 13
5:00 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 3 0 0 3 5 12
5:15 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2
5:30 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 2
5:45 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 2 0 0 2 3
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 100 20 7 710 7 81 020 30 6 610 6 71 5 0
Total Truck %age: 5.3% 100.0% 0.0% 0.0% 4.0% 0.0% 3.3% 0.8% 0.0% 3.1% 0.6% 0.0% 28.6% 0.0% 1.7% 0.0% 2.7% 5.0% 0.0% 2.7% 2.9%
Peak Hour Heavy Vehicle Volume Summary
Hourly Total
Time Period 3rd Street Main Street 3rd Street Main Street Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume
AM 7:15 AM 0 0 0 0 0 0 18 0 0 18 0 0 1 0 1 0 20 0 0 20 39
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 0 0 0 0 0 0 7 0 0 7 0 0 0 0 0 0 7 0 0 7 14
Intersection Traffic Volume Report Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Weekday Schools Not in Session
Non-Holiday No Special Events
Start Date:
Heavy Vehicles (Single-Unit Trucks, Buses & Semi-Trucks)
Totals
AM Peak PeriodMidday Peak Period
From North From East
PM Peak Period
From North From East From South From West
From South From West
Page 119 of 230
Count Basics Page 10 of 13
15-Minute Heavy Vehicle Percentages
Main Street & 3rd Street
15-Minute Heavy Vehicle Percentages
Total Hourly
15-Minute Heavy Heavy
Time Period 3rd Street Main Street 3rd Street Main Street Vehicle Veh icle
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Percent Percent
6:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 4.5 0.0 0.0 4.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 1.4 3.5
6:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 2.4 0.0 0.0 2.4 0.0 0.0 0.0 0.0 0.0 0.0 6.5 0.0 0. 0 6.5 4.8 4.2
6:30 AM 100.0 0.0 0.0 0.0 50.0 0.0 6.1 0.0 0.0 5.4 0.0 0.0 0.0 0.0 0.0 0.0 5.4 0. 0 0.0 5.4 6.1 4.4
6:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 2.3 20.0 0.0 4.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 1.4 4.2
7:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 8.9 0.0 0.0 8.5 0.0 0.0 0.0 0.0 0.0 0.0 3.8 0.0 0. 0 3.8 5.0 4.6
7:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 3.8 0.0 0.0 3.3 0.0 0.0 0.0 0.0 0.0 0.0 6.3 0.0 0. 0 6.3 5.1 4.6
7:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 9.5 0.0 0.0 8.5 0.0 0.0 0.0 0.0 0.0 0.0 3.4 0.0 0. 0 3.2 4.9 4.2
7:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 6.8 0.0 0.0 5.9 0.0 0.0 0.0 0.0 0.0 0.0 2.3 0.0 0. 0 2.3 3.8 3.5
8:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 5.8 0.0 0.0 4.8 0.0 0.0 100.0 0.0 33.3 0.0 4.5 0. 0 0.0 4.2 4.8 3.5
8:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 7.1 0.0 0.0 5.5 0.0 0.0 0.0 0.0 0.0 0.0 1.8 0.0 0. 0 1.8 3.3
8:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 3.6 0.0 0.0 2.9 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0 0. 0 1.1 2.0
8:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 2.7 0.0 0.0 2.3 0.0 0.0 0.0 0.0 0.0 0.0 5.5 0.0 0. 0 5.4 3.9
9:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
10:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
10:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
10:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
10:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
11:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
11:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
11:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
11:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
12:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
12:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
12:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
12:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
1:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
1:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
1:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
1:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
2:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
2:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
2:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
2:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
3:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 4.8 0.0 0.0 4.7 0.0 0.0 100.0 0.0 12.5 0.0 2.3 50 .0 0.0 3.4 4.3 3.9
3:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 2.0 0.0 0.0 1.9 0.0 0.0 0.0 0.0 0.0 0.0 4.9 0.0 0. 0 4.9 3.3 4.0
3:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 4.1 0.0 0.0 3.9 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0. 0 1.0 2.4 3.2
3:45 PM 0.0 100.0 0.0 0.0 100.0 0.0 6.3 0.0 0.0 6.1 14.3 0.0 0.0 0.0 14.3 0.0 3. 1 0.0 0.0 3.1 5.5 2.6
4:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 6.1 0.0 0.0 5.9 0.0 0.0 0.0 0.0 0.0 0.0 2.9 0.0 0. 0 2.8 4.3 1.8
4:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.9 0.0 0. 0 0.9 0.7 1.2
4:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0 0.0 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0 0. 0 0.7 0.9 1.2
4:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 1.4 0.0 0.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0 0. 0 2.1 1.5 1.2
5:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 1.1 0.0 0.0 1.1 0.0 0.0 0.0 0.0 0.0 0.0 2.7 0.0 0. 0 2.7 1.6 1.1
5:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0 0. 0 0.7 0.7
5:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 1.4 0.0 0.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.8
5:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 2.4 0.0 0. 0 2.3 1.3
6:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
6:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
6:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
6:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
7:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
7:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
7:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
7:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
8:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
8:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
8:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
8:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
9:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0
5.3 100.0 0.0 0.0 4.0 0.0 3.3 0.8 0.0 3.1 0.6 0.0 28.6 0.0 1.7 0.0 2.7 5.0 0.0 2.7 2.9
Semi Truck Percentage: 0.6682
Peak Hour Heavy Vehicle Percentages Summary
Hourly
Hourly Heavy
Time Period 3rd Street Main Street 3rd Street Main Street Vehicle
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Percent
AM 7:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 6.6 0.0 0.0 5.7 0.0 0.0 100.0 0.0 7.7 0.0 4.1 0.0 0.0 4.0 4.6
MD 12:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0
PM 4:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 1.1 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 1.5 0.0 0. 0 1.5 1.2
%
Weekday Schools Not in Session
Non-Holiday
Heavy Vehicles (Single-Unit Trucks, Buses & Semi-Trucks)
No Special Events
PM Peak Period
Totals
AM Peak PeriodMidday Peak Period
From North
Intersection Traffic Volume Report Start Date: Tuesday, August 5, 2025
Total Number of Hours Counted: 6
From North From East From South From West
From South From WestFrom East
Page 120 of 230
Page 11 of 13
15-Minute Pedestrian and Bicyclist Data
Main Street & 3rd Street
15-Minute Pedestrian and Bicyclist Data
15-Minute
Time Period 3rd Street Main Street 3rd Street Main Street 15-Min Hour ly
Start Time Total Total Total Total Totals Sum
6:00 AM 1030 4 1 5
6:15 AM 0030 3 1 3
6:30 AM 1012 4 1 7
6:45 AM 0040 4 1 5
7:00 AM 0011 2 1 4
7:15 AM 2041 7 1 6
7:30 AM 0011 2 1 4
7:45 AM 0012 3 2 2
8:00 AM 1021 4 1 9
8:15 AM 1022 5
8:30 AM 2053 1 0
8:45 AM 0000 0
9:00 AM 0000 0
9:15 AM 0000 0
9:30 AM 0000 0
9:45 AM 0000 0
10:00 AM 0000 0
10:15 AM 0000 0
10:30 AM 0000 0
10:45 AM 0000 0
11:00 AM 0000 0
11:15 AM 0000 0
11:30 AM 0000 0
11:45 AM 0000 0
12:00 PM 0000 0
12:15 PM 0000 0
12:30 PM 0000 0
12:45 PM 0000 0
1:00 PM 0000 0
1:15 PM 0000 0
1:30 PM 0000 0
1:45 PM 0000 0
2:00 PM 0000 0
2:15 PM 0000 0
2:30 PM 0000 0
2:45 PM 0000 0
3:00 PM 10 1 4 6 21 64
3:15 PM 10 0 5 6 21 56
3:30 PM 2123 8 4 3
3:45 PM 2057 1 4 3 5
4:00 PM 5143 1 3 2 6
4:15 PM 2006 8 1 7
4:30 PM 0000 0 1 0
4:45 PM 1013 5 2 2
5:00 PM 1012 4 2 5
5:15 PM 0010 1
5:30 PM 4170 1 2
5:45 PM 2042 8
6:00 PM 0000 0
6:15 PM 0000 0
6:30 PM
0000 0
6:45 PM 0000 0
7:00 PM 0000 0
7:15 PM 0000 0
7:30 PM 0000 0
7:45 PM 0000 0
8:00 PM 0000 0
8:15 PM 0000 0
8:30 PM 0000 0
8:45 PM 0000 0
9:00 PM 0000 0
9:15 PM 0000 0
9:30 PM 0000 0
9:45 PM 0000 0
47 4 61 51 163
Special Pedestrians
Pedestrian Type
Other (None)
Intersection Traffic Volume Report
1
00
00
1
10
Weekday Schools Not in Session
Non-Holiday No Special Events
Totals 47 0 1
None
Pre-school Children
Elementry School Age Children
Visually Impaired (white cane/help
e
48 3
Pedestrian Bicyclist
00
61
0
3
0
1 or 2 A Few Several Many
Elderly/Disabled (except wheelchai
Wheelchairs/Electric Scooters
x
x
x
x
x
x
0
0
10
0
00
5
00 00
0
00 00
0
1
00 00
0
Pedestrian Bicyclist
30
00
20
0
0
30
10
0
040
Midday Peak Period
0
1
0
0
0
0
0
0
00
00 0
0
0
00
0
0
2
Bicyclist
0
0
0
0
AM Peak Period
0
Crossing
00 0
0
00 0
0
Pedestrian Bicyclist Pedestrian
10
0
0
0
0
00
0
1
00 00
0
01 02
20 00 40 0
10
2010 00
00 02 01
2
000 00
1
00 00
0
02
0
00 000
00
00 00 00 00
00
00 00 00 00
00 00 00
00
00 00 00 00
00 00 00
00
00 00 00 00
00 00 00
00
00 00 00 00
00 00 00
00
00
00 00 00
00 00 00
0
00
00
00
00 00 00 00
00 00 00
00
00 00 00 00
00 00 00
00
00 00 00 00
00 00 00
00
1 0 00 14 06 0
00 00 00
60
20 01 20 21
1 0 00 05 0
70
50 10 40 30
20 00 50
11
10 00 10
0
00 00 00 00
20 00 00
00 10
00 01 0
0
40 01 70 00
00
00 00 00
00 00 00 00
00
00
00
2
00 00 00 00
00 00 00
00 0
00 00 00
PM Peak Period
00 0
0
0
0
00 0
20 00 40
00
North Approach East Approach South Approach
00
000
00 00 00
00
00 00 0
Crossing
0
00 00
00 0
00 00
00 000
Crossing Crossing
0
00
00 00 0
0
00
00 00
00 00 00
00
00
00
Tuesday, August 5, 2025
Total Number of Hours Counted: 6
Start Date:
Count Basics
Unknown
West Approach
00
Pedestrians and Bicyclists
00 00
00
30
6
Page 121 of 230
Page 12 of 13
15-Minute Adult & Children Count (Manual Entry)
Main Street & 3rd Street
15-Minute Adult & Children Pedestrian Data
15-Minute
Time Period 3rd Street Main Street 3rd Street Main Street 15-Min Hour ly
Start Time Total Total Total Total Totals Sum
12:00 AM 0000 0 0
12:15 AM 0000 0 0
12:30 AM 0000 0 0
12:45 AM 0000 0 0
1:00 AM 0000 0 0
1:15 AM 0000 0 0
1:30 AM 0000 0 0
1:45 AM 0000 0 0
2:00 AM 0000 0 0
2:15 AM 0000 0 0
2:30 AM 0000 0 0
2:45 AM 0000 0 0
3:00 AM 0000 0 0
3:15 AM 0000 0 0
3:30 AM 0000 0 0
3:45 AM 0000 0 0
4:00 AM 0000 0 0
4:15 AM 0000 0 0
4:30 AM 0000 0 0
4:45 AM 0000 0 0
5:00 AM 0000 0 0
5:15 AM 0000 0 4
5:30 AM 0000 0 7
5:45 AM 0000 0 1 1
6:00 AM 1030 4 1 5
6:15 AM 0030 3 1 3
6:30 AM 1012 4 1 7
6:45 AM 0040 4 1 5
7:00 AM 0011 2 1 4
7:15 AM 2041 7 1 6
7:30 AM 0011 2 1 4
7:45 AM 0012 3 2 1
8:00 AM 1021 4 1 8
8:15 AM 1022 5 1 4
8:30 AM 2052 9 9
8:45 AM 0000 0 0
9:00 AM 0000 0 0
9:15 AM 0000 0 0
9:30 AM 0000 0 0
9:45 AM 0000 0 0
10:00 AM 0000 0 0
10:15 AM 0000 0 0
10:30 AM 0000 0 0
10:45 AM 0000 0 0
11:00 AM 0000 0 0
11:15 AM 0000 0 0
11:30 AM 0000 0 0
11:45 AM 0000 0 0
12:00 PM 0000 0 0
12:15 PM 0000 0 0
12:30 PM 0000 0 0
12:45 PM 0000 0 0
1:00 PM 0000 0 0
1:15 PM 0000 0 0
1:30 PM 0000 0 0
1:45 PM 0000 0 0
2:00 PM 0000 0 0
2:15 PM 0000 0 2 0
2:30 PM 0000 0 4 1
2:45 PM 0000 0 4 7
3:00 PM 10 0 4 6 20 61
3:15 PM 10 0 5 6 21 54
3:30 PM 2022 6 4 1
3:45 PM 2057 1 4 3 5
4:00 PM 5143 1 3 2 6
4:15 PM 2006 8 1 6
4:30 PM 0000 0 9
4:45 PM 1013 5 2 0
5:00 PM 1011 3 2 3
5:15 PM 0010 1 2 0
5:30 PM 4070 1 1 1 9
5:45 PM 2042 8 8
6:00 PM 0000 0 0
6:15 PM 0000 0 0
6:30 PM 0000 0 0
6:45 PM 0000 0 0
7:00 PM 0000 0 0
7:15 PM 0000 0 0
7:30 PM 0000 0 0
7:45 PM 0000 0 0
8:00 PM 0000 0 0
8:15 PM 0000 0 0
8:30 PM 0000 0 0
8:45 PM 0000 0 0
9:00 PM 0000 0 0
9:15 PM 0000 0 0
9:30 PM 0000 0 0
9:45 PM 0000 0 0
10:00 PM 0000 0 0
10:15 PM 0000 0 0
10:30 PM 0000 0 0
10:45 PM 0000 0 0
11:00 PM 0000 0 0
11:15 PM 0000 0
11:30 PM 0000 0
11:45 PM 0000 0
47 1 61 48 157
Intersection Traffic Volume Report
0000
0000
Post PM Peak Period
000
0000
0000
0000
0
0000
0000
0000
0
0
0
0
0
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
000
0000
0000
000
0000
AM Peak Period Pre-AM Peak Period
0000
0000
0000
0
0
0
0
0
1
0
00
0
0
0
00
00
0
0
0
0
04 8 0Totals 47 0 1 0 61
0
0000
000
0
0000
000
0
0000
000
0
0000
000
0
0000
000
0
0000
000
0
0000
000
0
0000
000
0
2042
407
1
0010
101
0
1013
000
3
2006
514
6
2
2057
202
0
00
1 0 046
0
0000
PM Peak Period
000
00
000
10 0 5
0
0000
000
0
0000
000
0
0000
000
0
0000
000
0
0000
000
0
Midday Peak Period
0
0000
000
0
0
0
0000
000
2
0000
205
1
1022
102
1
0012
001
1
2041
001
40
101
Crossing
North Approach East Approach South Approach West Approach
2
000
0
3
30
0
Count Basics
Start Date: Tuesday, August 5, 2025 Weekday Schools Not in Session
Total Number of Hours Counted: 6 Non-Holiday No Special Events
Adults Children Adults Children Adults Children Adults Children
Adults & Children
Crossing Crossing Crossing
Page 122 of 230
Count Basics Page 13 of 1 3
15-Minute Bicycle Turning Movement Count (Manual Entry)
Main Street & 3rd Street
15-Minute Bicycle Data
15-Minute
Time Period 3rd Street Main Street 3rd Street Main Street 15-Min Hour ly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum
12:00 AM 0000 0 0
12:15 AM 0000 0 0
12:30 AM 0000 0 0
12:45 AM 0000 0 0
1:00 AM 0000 0 0
1:15 AM 0000 0 0
1:30 AM 0000 0 0
1:45 AM 0000 0 0
2:00 AM 0000 0 0
2:15 AM 0000 0 0
2:30 AM 0000 0 0
2:45 AM 0000 0 0
3:00 AM 0000 0 0
3:15 AM 0000 0 0
3:30 AM 0000 0 0
3:45 AM 0000 0 0
4:00 AM 0000 0 0
4:15 AM 0000 0 0
4:30 AM 0000 0 0
4:45 AM 0000 0 0
5:00 AM 0000 0 0
5:15 AM 0000 0 0
5:30 AM 0000 0 0
5:45 AM 0000 0 0
6:00 AM 0000 0 0
6:15 AM 0000 0 0
6:30 AM 0000 0 0
6:45 AM 0000 0 0
7:00 AM 0000 0 0
7:15 AM 0000 0 0
7:30 AM 0000 0 0
7:45 AM 0000 0 0
8:00 AM 0000 0 0
8:15 AM 0000 0 0
8:30 AM 0000 0 0
8:45 AM 0000 0 0
9:00 AM 0000 0 0
9:15 AM 0000 0 0
9:30 AM 0000 0 0
9:45 AM 0000 0 0
10:00 AM 0000 0 0
10:15 AM 0000 0 0
10:30 AM 0000 0 0
10:45 AM 0000 0 0
11:00 AM 0000 0 0
11:15 AM 0000 0 0
11:30 AM 0000 0 0
11:45 AM 0000 0 0
12:00 PM 0000 0 0
12:15 PM 0000 0 0
12:30 PM 0000 0 0
12:45 PM 0000 0 0
1:00 PM 0000 0 0
1:15 PM 0000 0 0
1:30 PM 0000 0 0
1:45 PM 0000 0 0
2:00 PM 0000 0 0
2:15 PM 0000 0 0
2:30 PM 0000 0 0
2:45 PM 0000 0 0
3:00 PM 0000 0 0
3:15 PM 0000 0 0
3:30 PM 0000 0 0
3:45 PM 0000 0 0
4:00 PM 0000 0 0
4:15 PM 0000 0 0
4:30 PM 0000 0 0
4:45 PM 0000 0 0
5:00 PM 0000 0 0
5:15 PM 0000 0 0
5:30 PM 0000 0 0
5:45 PM 0000 0 0
6:00 PM 0000 0 0
6:15 PM 0000 0 0
6:30 PM 0000 0 0
6:45 PM 0000 0 0
7:00 PM 0000 0 0
7:15 PM 0000 0 0
7:30 PM 0000 0 0
7:45 PM 0000 0 0
8:00 PM 0000 0 0
8:15 PM 0000 0 0
8:30 PM 0000 0 0
8:45 PM 0000 0 0
9:00 PM 0000 0 0
9:15 PM 0000 0 0
9:30 PM 0000 0 0
9:45 PM 0000 0 0
10:00 PM 0000 0 0
10:15 PM 0000 0 0
10:30 PM 0000 0 0
10:45 PM 0000 0 0
11:00 PM 0000 0 0
11:15 PM 0000 0
11:30 PM 0000 0
11:45 PM 0000 0
0 000 00 000 00 000 00 000 0 0
Peak Hour Bicycle Turning Movement Volume Summary
Hourly Total
Time Period 3rd Street Main Street 3rd Street Main Street Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume
AM 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Pre-AM Peak Period
Start Date: Tuesday, August 5, 2025 Weekday
From East From South From West
Intersection Traffic Volume Report Schools Not in Session
Total Number of Hours Counted: 6 Non-Holiday No Special Events
Midday Peak Period
Bicyclists
From North
Post PM Peak Period AM Peak PeriodPM Peak Period
Totals
From North From East From South From West
Page 123 of 230
Count Basics Special Report
15-Minute Motor Vehicle Data (Daily & Seasonally Adjusted)
Main Street & 3rd Street
15-Minute Motor Vehicle Data
15-Minute
Time Period 3rd Street Main Street 3rd Street Main Street 15-Min Hour ly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum PHF
12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 AM 0 0 1 0 1 0 19 0 0 19 2 0 0 0 2 0 40 0 0 40 62 400 0.78
6:15 AM 0 0 0 0 0 1 36 0 0 37 1 0 0 0 1 0 54 0 0 54 92 478 0.85
6:30 AM 1 0 1 0 2 0 29 4 0 33 0 0 1 0 1 0 81 0 0 81 117 558 0.81
6:45 AM 1 0 0 0 1 0 39 4 0 43 2 0 1 0 3 0 82 0 0 82 129 622 0.86
7:00 AM 2 0 3 0 5 0 39 2 0 41 3 0 0 0 3 0 91 0 0 91 140 704 0.83
7:15 AM 0 0 3 0 3 1 47 6 0 54 3 0 0 0 3 0 111 1 0 112 172 746 0.88
7:30 AM 2 0 2 0 4 3 55 4 0 62 4 0 0 0 4 5 104 2 0 111 181 759 0.90
7:45 AM 0 0 3 0 3 2 77 11 0 90 2 0 0 0 2 2 112 2 0 116 211 755 0.89
8:00 AM 1 0 1 0 2 2 61 11 0 74 2 0 1 0 3 4 97 2 0 103 182 724 0.98
8:15 AM 0 0 1 0 1 3 61 16 0 80 4 0 0 0 4 2 98 0 0 100 185
8:30 AM 2 0 1 0 3 1 74 16 0 91 4 0 1 0 5 4 74 0 0 78 177
8:45 AM 0 0 2 0 2 3 65 8 0 76 3 0 0 0 3 2 97 0 0 99 180
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 0 0 3 0 3 2 91 1 0 94 6 0 1 0 7 1 75 2 0 78 182 765 0.92
3:15 PM 1 0 0 0 1 3 89 3 0 95 4 0 0 0 4 0 90 0 0 90 190 847 0.80
3:30 PM 0 0 1 0 1 3 86 1 0 90 4 0 0 0 4 1 86 2 0 89 184 922 0.87
3:45 PM 0 1 0 0 1 3 111 2 0 116 6 0 0 0 6 0 86 0 0 86 209 1036 0.87
4:00 PM 1 0 1 0 2 4 143 3 0 150 18 0 1 0 19 1 92 0 0 93 264 1059 0.89
4:15 PM 0 0 1 0 1 3 140 0 1 144 20 1 0 0 21 1 97 1 0 99 265 1066 0.89
4:30 PM 2 0 1 0 3 4 147 2 0 153 21 0 0 0 21 0 121 0 0 121 298 1060 0.89
4:45 PM 2 0 2 0 4 6 125 4 0 135 8 0 0 0 8 0 83 2 0 85 232 993 0.92
5:00 PM 1 0 0 0 1 2 154 3 0 159 12 0 0 0 12 0 99 0 0 99 271 962 0.89
5:15 PM 1 0 2 0 3 2 118 3 0 123 5 0 0 0 5 2 125 1 0 128 259
5:30 PM 1 0 1 0 2 3 126 4 0 133 8 0 0 0 8 1 86 1 0 88 231
5:45 PM 1 0 0 0 1 3 116 1 0 120 3 0 1 0 4 0 72 4 0 76 201
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
19 1 30 0 50 54 2048 109 1 2212 145 1 7 0 153 26 2153 20 0 2199 4614
Peak Hour All Vehicle Volume Summary
Hourly Total
Time Period 3rd Street Main Street 3rd Street Main Street Hourly
Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume PHF
AM 7:15 AM 3 0 9 0 12 8 240 32 0 280 11 0 1 0 12 11 424 7 0 442 746 0.88
MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 4:15 PM 5 0 4 0 9 15 566 9 1 591 61 1 0 0 62 1 400 3 0 404 1066 0.89PM Peak Period
Totals
Post PM Peak Period Midday Peak Period
From North
AM Peak Period Pre-AM Peak Period
All Motor Vehicles
From North From East From South From West
From East
Intersection Traffic Volume Report Schools Not in Session
Total Number of Hours Counted: 6 Non-Holiday No Special Events
Start Date: Tuesday, August 5, 2025 Weekday
From South From West
Page 124 of 230
Total Volume (Hourly)
Alley btwn 2nd and 3rd (43.009097, -89.737856)
Started: 8/5/2025 10:00
Ended: 8/7/2025 9:00
--- --- --- --- --- --- --- --- Total --- --- Total --- --- Total --- --- --- --- --- --- --- --- Total
00:00 --- 0 0-- 00:00 00:00-00:59 0
01:00 --- 0 0-- 01:00 01:00-01:59 0
02:00 --- 0 0-- 02:00 02:00-02:59 0
03:00 --- 0 0-- 03:00 03:00-03:59 0
04:00 --- 0 0-- 04:00 04:00-04:59 0
05:00 --- 0 0-- 05:00 05:00-05:59 0
06:00 --- 1 0-- 06:00 06:00-06:59 1
07:00 --- 3 2-- 07:00 07:00-07:59 3
08:00 --- 3 5-- 08:00 08:00-08:59 4
09:00 --- 7 6-- 09:00 09:00-09:59 7
10:00 -- 4 2--- 10:00 10:00-10:59 3
11:00 -- 2 2--- 11:00 11:00-11:59 2
12:00 -- 9 4--- 12:00 12:00-12:59 7
13:00 -- 1 4 4--- 13:00 13:00-13:59 9
14:00 -- 8 6--- 14:00 14:00-14:59 7
15:00 -- 3 7--- 15:00 15:00-15:59 5
16:00 -- 7 8--- 16:00 16:00-16:59 8
17:00 -- 8 6--- 17:00 17:00-17:59 7
18:00 -- 3 8--- 18:00 18:00-18:59 6
19:00 -- 3 2--- 19:00 19:00-19:59 3
20:00 -- 1 2--- 20:00 20:00-20:59 2
21:00 -- 2 0--- 21:00 21:00-21:59 1
22:00 -- 0 0--- 22:00 22:00-22:59 0
23:00 -- 1 0--- 23:00 23:00-23:59 1
Daily Total - - - -- - -- 65 -- 65 -- 13 -- - -- - Daily Total - - 72
AM Peak --- 7 7-- AM Peak 7
HV% --- -- HV%
Hour - - - 08:45 08:30 - - Hour 08:45
MD Peak -- 1 4 5--- MD Peak 9
HV% -- 1 4 % --- HV% 17%
Hour - - 13:00 12:30 - - - Hour 13:00
PM Peak -- 8 9--- PM Peak 9
HV% -- --- HV%
Hour - - 14:00 16:15 - - - Hour 16:15
Wed 0.947
Daily/Seasonal Factor Thurs 0.918
(1) Non-Interstate Low ruck % Fri 0.92 62 60 12
Weekday ADT 72
Adjusted 67
Location Description:
Hour Mon-Thurs AverageHour --- --- Tue 8/5/25 Wed 8/6/25 Thu 8/7/25 --- ---
Page 125 of 230
Main Street Residential/Mixed-Use Development – Mt Horeb, Wisconsin
Appendix B
Trip Generation Comparison
Page 126 of 230
3516: 8-14-25
N
NOT TO SCALE
APPENDIX B
TRIP GENERATION COMPARISON TABLE
MT HOREB, WISCONSIN
In Out Total In Out Total
220 5 25 30 20 5 25
(3.44) (23%) (77%) (0.44) (71%) (29%) (0.36)
Not 5 10 15 5 5 10
Available (23%) (77%) (0.22) (71%) (29%) (0.17)
0 15 15 15 0 15
Appendix
Trip Generation Comparison Table1
Land Use
ITE
Code Proposed Size
Weekday
Daily
AM Peak PM Peak
Low-Rise Residential with Ground-Floor
Commercial (2-3 Floors) (1-25k) 230 65 Units
Mid-Rise Residential with Ground-Floor
Commercial (4-10 Floors) (1-25k) 231 65 Units
Difference
1ITE Trip Rates (X.XX) and/or Fitted Curve Equations (FCE) are from the ITE Trip Generation Manual, 11th Edition.
Page 127 of 230
Main Street Residential/Mixed-Use Development – Mt Horeb, Wisconsin
Appendix C
Gap Analysis
Page 128 of 230
Gap Analysis Calculations
Main Street & 3rd Street
Look Up Tables Calculated Values
Inputs Major Street Tc,HV Tf,HV Tc,HV Tf,HV
2 lanes 1.0 0.9 1.0 0.9
4 lanes 2.0 1.0
Grade Adjust. Tc,G G
Minor RT 0.1 0.0
Minor LT/TH 0.2
Gap Acceptance Tc,t Tc,t
Calculations 1 stage 0.0 0.0
Tc,x Tf,x 1 Veh 2 Veh 3 Veh Tc,x Tf,x 1 Veh 2 Veh 3 Veh 2 stage 1.0
4.2 2.3 4.2 10.6 17.0 4.1 2.2 4.1 10.5 16.8
6.3 3.4 6.3 15.9 25.5 6.2 3.3 6.2 15.8 25.3 Geometry T3,lt T3,lt
6.6 4.1 6.6 17.2 27.8 6.5 4.0 6.5 17.1 27.6 3-leg 0.7 0.0
7.2 3.6 7.2 17.9 28.6 7.1 3.5 7.1 17.8 28.4 4-leg 0.0
Equations HCM Exhibit 17-5 Base follow-up
Tc,x = Tc,base + Tc,HVPHV + Tc,GG - Tc,T - T3,LT Vehicle Movement 2-Ln Major 4-Ln Major Tf,base (s) Tc,base Tf,base Tc,G
Tf,x = Tf,base + Tf,HVPHV LT from Major 4.1 4.1 2.2 4.1 2.2 0.0
RT from Minor 6.2 6.9 3.3 6.2 3.3 0.1
Definitions TH on Minor 6.5 6.5 4.0 6.5 4.0 0.2
Tc,x Critical gap for movement LT from Minor 7.1 7.5 3.5 7.1 3.5 0.2
Tc,base base critical gap (Exhibit 17-5)
Tc,HV HV adjustment factor (1.0 2-ln, 2.0 4-ln) for major street PHV
PHV proportion of heavy vehicles for minor movement AM 0.06
Tc,G grade adjustment factor (0.1 mvmts 9 & 12, 0.2 mvmts 7, 8, 10, & 11) PM 0.02
G percent grade divided by 100
Tc,T 2-stage gap acceptance adjustment factor (1.0 for 1st or 2nd stage, 0.0 for only 1 stage)
T3,LT intersection geometry adjsutment factor (0.7 minor street left turn at 3-leg intersection, 0.0 otherwise)
Tf,x minor movement follow-up time
Tf,base base follow-up time from exhibit 17-5
Tf,HV heavy vehicle adjustment factor (0.9 for 2-ln major, 1.0 for 4-ln major)
PHV proportion of heavy vehicles for minor movement
Lanes on Major St. (both dir.) 2 lanes
%HV on Minor Street (AM) 6.0%
%HV on Minor Street (PM) 2.0%
Grade 0.0%
Gap Acceptance 1 stage
Legs at Intersection 4 leg
Left Turn from Minor
Base Critical Gap Tc,base (s)
AM PM
Left turn from major
Right Turn from Minor
Through Traffic on Minor
Page 129 of 230
Start Time 2 - 3 4 - 5 6 - 7 8 - 9 10 - 11 12 - 13 14 - 15 16 - 17 18 - 19 20 - 21 22 - 23 24 - 25 26 - 27 28 - 29 >29
7:15 AM 842132213231009
7:30 AM 10 35422362322115
7:45 AM 15 78564140013222
8:00 AM 728341143110018
Total 40 16 23 13 15 9 7 15 867634 2 4
Start Time 2 - 3 4 - 5 6 - 7 8 - 9 10 - 11 12 - 13 14 - 15 16 - 17 18 - 19 20 - 21 22 - 23 24 - 25 26 - 27 28 - 29 >29
7:15 AM 6 10 4864433112200
7:30 AM 13 11 7455231211211
7:45 AM 12 18 9826310020111
8:00 AM 16 87453543101012
Total 47 47 27 24 18 18 14 11 7444534
Start Time 2 - 3 4 - 5 6 - 7 8 - 9 10 - 11 12 - 13 14 - 15 16 - 17 18 - 19 20 - 21 22 - 23 24 - 25 26 - 27 28 - 29 >29
7:15 AM 16 11 8865311101200
7:30 AM 31 13 8245133001000
7:45 AM 31 16 9822200010000
8:00 AM 21 8 6 11 51521000001
Total 99 48 31 29 17 13 11 65112201
Gap Calcs
Gaps Gaps
1 Veh (x1) 6.3 15.8 63 6.3 15.8 96
2 Veh (x2) 15.9 25.4 82 15.9 25.4 60
3 Veh (x3) 25.5 & up 98 25.5 & up 40
243 196
Westbound Gap Eastbound Gap
Gap Calcs
Gaps
1 Veh (x1) 7.2 17.8 78
2 Veh (x2) 17.9 28.5 24
3 Veh (x3) 28.6 & up 3
105
Combined Gap
Gap Calcs
Gaps Gaps
1 Veh (x1) 4.2 10.5 54 4.2 10.5 98
2 Veh (x2) 10.6 16.9 68 10.6 16.9 101
3 Veh (x3) 17.0 & up 199 17.0 & up 111
321 310
Westbound Gap Eastbound Gap
Main Street & 3rd Street Traffic Gaps
NB & SB LT from Minor
Gap Times
Equivalent Gaps
EB LT from Major WB LT from Major
Gap Times Gap Times
Equivalent Gaps
Weekday AM 8/6/2025 - Wednesday
Westbound Gaps
Eastbound Gaps
Combined Gaps
SB RT from Minor NB RT from Minor
Gap Times Gap Times
Equivalent Gaps
Page 130 of 230
Start Time 2 - 3 4 - 5 6 - 7 8 - 9 10 - 11 12 - 13 14 - 15 16 - 17 18 - 19 20 - 21 22 - 23 24 - 25 26 - 27 28 - 29 >29
4:15 PM 40 96542200131000
4:30 PM 29 13 3561320100011
4:45 PM 31 10 10 853333001010
5:00 PM 43 13 10 654221000010
Total 143 45 29 24 20 10 10 74232031
Start Time 2 - 3 4 - 5 6 - 7 8 - 9 10 - 11 12 - 13 14 - 15 16 - 17 18 - 19 20 - 21 22 - 23 24 - 25 26 - 27 28 - 29 >29
4:15 PM 11 23 5941442220310
4:30 PM 13 11 12 558200300311
4:45 PM 10 15 4973142200204
5:00 PM 7 10 4883623300211
Total 41 59 25 31 24 15 13 10 7 10 2 0 10 3 6
Start Time 2 - 3 4 - 5 6 - 7 8 - 9 10 - 11 12 - 13 14 - 15 16 - 17 18 - 19 20 - 21 22 - 23 24 - 25 26 - 27 28 - 29 >29
4:15 PM 50 18 9540000000000
4:30 PM 37 12 5334000000000
4:45 PM 41 15 10 834200001000
5:00 PM 49 19 9523000000000
Total 177 64 33 21 12 11 200001000
Gap Calcs
Gaps Gaps
1 Veh (x1) 6.2 15.7 89 6.2 15.7 104
2 Veh (x2) 15.8 25.2 37 15.8 25.2 62
3 Veh (x3) 25.3 & up 14 25.3 & up 57
140 222
Westbound Gap Eastbound Gap
Gap Calcs
Gaps
1 Veh (x1) 7.1 17.7 49
2 Veh (x2) 17.8 28.3 2
3 Veh (x3) 28.4 & up 0
51
Combined Gap
Gap Calcs
Gaps Gaps
1 Veh (x1) 4.1 10.4 100 4.1 10.4 117
2 Veh (x2) 10.5 16.7 77 10.5 16.7 101
3 Veh (x3) 16.8 & up 59 16.8 & up 134
235 352
Westbound Gap Eastbound Gap
Main Street & 3rd Street Traffic Gaps
EB LT from Major WB LT from Major
Gap Times Gap Times
Eastbound Gaps
Combined Gaps
SB RT from Minor
Weekday PM 8/5/2025 - Tuesday
Westbound Gaps
NB RT from Minor
Equivalent Gaps
Gap TimesGap Times
Equivalent Gaps
NB & SB LT from Minor
Gap Times
Equivalent Gaps
Page 131 of 230
Main Street Residential/Mixed-Use Development – Mt Horeb, Wisconsin
Appendix D
Peak Hour Analysis Outputs
Existing Traffic
Full Build (Scenario 1- Two-way) Traffic
Full Build (Scenario 2 – One-way Westbound) Traffic
Page 132 of 230
Lanes, Volumes, Timings AM Peak
100: 2nd Street & Alley 08/14/2025
TADI Synchro 12 Report
Existing AM Peak Hour Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l u m e ( v p h ) 15 1 5511 1 0 1 551 3 01
F u t u r e V o l u m e ( v p h ) 15 1 5511 1 0 1 551 3 01
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.901 0.983 0.979 0.997
Flt Protected 0.998 0.964 0.983 0.999
Satd. Flow (prot) 0 1692 0 0 1783 0 0 1810 0 0 1874 0
Flt Permitted 0.998 0.964 0.983 0.999
Satd. Flow (perm) 0 1692 0 0 1783 0 0 1810 0 0 1874 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 289 200 228 207
Travel Time (s) 7.9 5.5 6.2 5.6
C o n f l . P e d s . ( # / h r )41 14 32 23
C o n f l . B i k e s ( # / h r ) 1111
Peak Hour Factor 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78
H e a v y V e h i c l e s ( % ) 1 %1 %1 %1 %1 %1 %1 %1 %1 %1 %1 %1 %
A d j . F l o w ( v p h ) 16 1 9611 1 3 1 961 3 81
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 2 600800 3 800 4 00
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 0 0
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Sign Control Stop Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 18.1% ICU Level of Service A
Analysis Period (min) 15
Page 133 of 230
HCM 7th TWSC AM Peak
100: 2nd Street & Alley 08/14/2025
TADI Synchro 12 Report
Existing AM Peak Hour Page 2
Intersection
Int Delay, s/veh 3.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 5 15 5 1 1 10 15 5 1 30 1
Future Vol, veh/h 1 5 15 5 1 1 10 15 5 1 30 1
C o n f l i c t i n g P e d s , # / h r 401104302203
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - -----------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 78 78 78 78 78 78 78 78 78 78 78 78
H e a v y V e h i c l e s , % 111111111111
M v m t F l o w 16 1 9611 1 3 1 961 3 81
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 94 98 43 95 95 28 43 0 0 28 0 0
Stage 1 45 45 - 50 50 -------
Stage 2 50 53 - 45 45 -------
Critical Hdwy 7.11 6.51 6.21 7.11 6.51 6.21 4.11 - - 4.11 - -
C r i t i c a l H d w y S t g 1 6 . 1 1 5 . 5 1- 6 . 1 1 5 . 5 1-------
C r i t i c a l H d w y S t g 2 6 . 1 1 5 . 5 1- 6 . 1 1 5 . 5 1-------
Follow-up Hdwy 3.509 4.009 3.309 3.509 4.009 3.309 2.209 - - 2.209 - -
Pot Cap-1 Maneuver 891 794 1030 890 797 1049 1573 - - 1593 - -
Stage 1 972 860 - 966 855 -------
Stage 2 966 852 - 971 859 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 875 783 1026 856 786 1043 1568 - - 1589 - -
Mov Cap-2 Maneuver 875 783 - 856 786 -------
Stage 1 968 857 - 956 846 -------
Stage 2 952 844 - 944 856 -------
Approach EB WB NB SB
HCM Ctrl Dly, s/v 8.91 9.2 2.44 0.23
HCM LOS A A
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 571 - - 948 867 56 - -
HCM Lane V/C Ratio 0.008 - - 0.028 0.01 0.001 - -
HCM Ctrl Dly (s/v) 7.3 0 - 8.9 9.2 7.3 0 -
HCM Lane LOS A A - AAAA -
HCM 95th %tile Q(veh) 0 - - 0.1 0 0 - -
Page 134 of 230
Lanes, Volumes, Timings AM Peak
200: 2nd Street & Main Street 08/14/2025
TADI Synchro 12 Report
Existing AM Peak Hour Page 3
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 10 400 20 30 230 15 20 5 65 40 1 10
Future Volume (vph) 10 400 20 30 230 15 20 5 65 40 1 10
Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750
Lane Util. Factor 1.00 1.00 1.00 1.00 1.0
Text truncated. Open the original for the full document.
Source: Village of Mount Horeb website. First collected Nov 2, 2026.