RecordWell Data

Historic Preservation Commission — Agenda Packet

Village of Mount Horeb · Dane County · Historic Preservation Commission · meeting of Oct 28, 2026 · Agenda packets

Open the original document More from Village of Mount Horeb

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Administrative Offices Municipal Building - 138 East Main Street Mount Horeb, Wisconsin 53572 608.437.6884 | mounthorebwi.info Historic Preservation Commission Meeting Agenda Wednesday, October 28, 2026 at 6:00 PM Mount Horeb Senior Center 107 North Grove Street Mount Horeb, WI 1) Call to order 2) Roll call 3) Public Participation Participants may speak for up to three minutes. To participate, please complete a public comment form at the Board Room entrance and submit it to staff before the meeting begins. See below for more details. 4) Consent Agenda All items listed below are considered to be routine by the Governing Body and will be enacted by one motion (roll call vote). There will be no separate discussion of these items unless a Board member so requests, in which event the item will be removed from the Consent Agenda and considered as the first item after the Consent Agenda. a. Consideration of August 26, 2026 Meeting Minutes 5) Chair's Report 6) Staff Reports 7) Action Items a. Discuss and provide comments to the Plan Commission on the proposed Site Plan for 208, 214, and 220 East Main Street 1. Presentation from Applicant 2. Public Participation on Application. (Public Participation for this agenda item will be limited to 30 minutes and all comments should be specifically related how this project fits with the downtown design standards or the historical nature of the area. General site plan comments should be presented at the Plan Commission meeting which starts at 7:00 p.m.) 3. Staff Comment on Application 4. Commission Discussion and Potential Action 8) Adjournment Page 1 of 224 *Public Comment Policy Members of the public are invited to speak at meetings of all Mount Horeb Public Bodies. To comment, please complete a Public Comment Form at the Meeting Room entrance and submit it to staff before the meeting begins. Comments are limited to three minutes, must be made from the podium, and the speaker must return to the audience after speaking. • Non-agenda item comments are heard at the start of the meeting. Public Body members and staff will not engage in discussion during public comment but may consider topics for future agendas. • Agenda item comments are heard during the relevant item, after the proposers or staff present the item and before Public Body discussion. All public comments on the item will be heard before any discussion by the Public Body. Members of the public will only be allowed to speak outside these public comment times if they are invited by the meeting chair to share additional information requested by the Public Body. If so invited to speak, the member of the public must do so from the podium. Written comments are also welcome. Written comments shall include the name and address of the submitter and should be submitted to the Deputy Treasurer/Governance Coordinator by email at niki.erickson@mounthorebwi.info (subject line: Public Comment Request-Name of Public Body) or delivered by to the Village at: 138 E Main Street, Mount Horeb WI, 53572, ATTN Public Comment Request-Name of Public Body. UPON REASONABLE NOTICE, EFFORTS WILL BE MADE TO ACCOMMODATE THE NEEDS OF DISABLED INDIVIDUALS THROUGH APPROPRIATE AIDS AND SERVICES. FOR INFORMATION OR TO REQUEST THIS SERVICE, CONTACT ALYSSA GAFFNEY, CLERK, AT 138 E MAIN STREET, MOUNT HOREB, WI (608) 437-9404. Page 2 of 224 Historic Preservation Commission Agenda Wednesday, August 26, 2026 at 6:00 PM Draft Minutes 1) Call to order Chair Marc Schellpfeffer called the meeting to order at 6:00 pm in the Board Room of the Municipal Building, 138 East Main Street, Mount Horeb, WI. 2) Roll Call Members Present: Curtis Johnson, Ted McMillan, Jill Schuettpelz, Destinee Udelhoven Others Present: Village Administrator Gabe Altenbernd, Assistant Clerk Jean Culberson 3) Public Comments on Non-Agenda Items None. 4) Consent Agenda a. Consideration of July 22, 2026 Meeting Minutes Udelhoven Motioned to approve the Consent Agenda and Johnson seconded. Motion carried by unanimous voice vote. 5) Agenda Items a. Consider a CLG grant to fund preparation of Mount Horeb-specific design review guidelines. Schellpfeffer and Udelhoven summarized the grant and design review standards. The Commission discussed the grant and standards. Schellpfeffer and Udelhoven presented the Letter of Intent to apply for the 2026 grant funding. Schuettpelz Motioned to approve the Letter of Intent and Johnson seconded. Motion carried by unanimous voice vote. 6) Chair Report No Report. 7) Staff Reports No Reports. 8) Future agenda items ­ Discussion on Section 17.02.22 Historic Preservation Overlay Zoning District ­ Introduction on the Historic Preservation District 9) Meeting adjournment. Johnson Motioned and McMillan seconded to Meeting adjournment at 6:22 pm. Motion carried by unanimous voice vote. Minutes by Clerk Jean Culberson Page 3 of 224 PLAN COMMISSION APPLICATION PROJECT NAME: _______________________________________________________________________________________________________ Project Address ______________________________________________ Parcel Number: __________________________________ Access Dane Link Zoning Map Current Zoning_______________________________ Future Land Use Zoning: __________________________________________ (select zoning layer in map) (select future land use layer in map) APPLICANT: ADDRESS: PHONE: EMAIL: OWNER: ADDRESS: PHONE: EMAIL: PROJECT DESCRIPTION: _________________________________________________________________________________________ ______________________________________________________________________________________________________________________ ______________________________________________________________________________________________________________________ OWNER/APPLICANT SIGNATURE: ________________________________________________________DATE: ___________________ FEES & DEPOSITS : (CHECK ALL THAT APPLY) Application Fee Public Hearing- Certified Survey Map (CSM) scroll to Section 18.61 in schedule Schedule Certified Survey Map Extraterritorial scroll to Section 18.61 in schedule Schedule Comprehensive Plan Amendment $150.00 Class One Conditional Use Permit (changes in USE of property) $150.00 Class Two Conditional Use Permit (planned development district) $200.00 Class Two Design Review $100.00 General Development Plan (GDP) $200.00 Specific Improvement Plan (SIP) $300.00 Zoning Amendment (changes in zoning) $150.00 Class Two Zoning Amendment (planned development district) $200.00 Class Two VILLAGE OF MOUNT HOREB Zoning Administrator 608-437-9409 138 East Main Street Mount Horeb, WI 53572 Developer Deposit: An escrow deposit is required in accordance with the Development Application Agreement. Total Fee Paid: ____________ Date: ______________ Fee Waived By: ____________________ Page 4 of 224 The Village of Mount Horeb Plan Commission meets the fourth Wednesday of the month, unless noted on calendar. A schedule of deadlines can be found on the Zoning page of the Village website: Plan Commission Calendar. Consultation with the Village Administrator is highly encouraged to discuss procedure and necessary forms prior to any submittal. Note: applications requiring a public hearing will be scheduled for a hearing according to the publication deadline, with action considered at the scheduled Plan Commission meeting following the public hearing. Applicants are encouraged to contact the Village Administrator for a pre-application meeting to review the project and submittal requirements prior to submitting an official application. Class One = Published in newspaper for one week / Class Two = Published in newspaper for two weeks Application submittals should include: • Fully executed Plan Commission Application • Fully executed Development Application Agreement (attached) • A development agreement is a voluntary contract between a local jurisdiction and a person who owns or controls property withing the jurisdiction, detailing the obligations of both parties and specifying the standards and conditions that will govern development. • Full payment for all associated fees • Written narrative of the proposed project • One electronic copy of full submittal emailed to (2 parties) gabe.altenbernd@mounthorebwi.info and mhbuildinginspector@mounthorebwi.info, • or provided to our offices on a USB device or submitted via downloaded file All submittals must contain the following to be considered complete: 1) Written narrative must include: a. Owner and/or developer names and addresses b. Where applicable; architect and/or engineer names and addresses c. Description of proposed uses d. Calculation indicating total site size, building floor area, number of parking stalls, amount of impervious surface, and amount of non-impervious green space 2) A scaled site plan which must include: a. Name of project and date of plan preparation b. Scale of drawing and north arrow c. Property boundaries d. Where applicable; both the one hundred (100) year recurrence interval floodplain and the floodway delineations e. Where applicable; wetlands as delineated in the WDNR Wetland Inventory and 75’ setback line from such wetlands f. Existing and proposed easements on the subject property g. Adjoining public street rights-of-way, street pavements, and sidewalk locations; existing and proposed driveways and curb cuts; and parking and loading areas h. Location of existing and proposed building footprints with building and yard setback lines indicated i. Location and size of any existing or proposed signs and fencing j. Location and type of all outdoor lighting proposed to illuminate the site; including a photometrics plan of the site. 3) Building Plans which must include: Page 5 of 224 a. Elevation drawing of each new or remodeled building façade, indicating height, materials and building dimensions b. Colored renderings of all façades of the principal building showing the proposed colors c. Building materials samples (upon request) 4) Grading and Stormwater Management Plan, including: a. Existing and proposed topography shown at a contour interval of not less than two (2) feet at National Geodetic Vertical Datum b. Location and dimension of Stormwater retention or detention basins and/or stormwater conveyances 5) Landscape Plan that meets all landscaping standards 6) Parking Calculations 7) Escrow fees as outlined in the Development Application Agreement 8) Erosion Control and Stormwater Management Application and fees. *No person may begin a land disturbing construction activity or land developing activity subject to this division until the person has paid the Erosion Control Review and Inspection fee. 9) Erosion Control Plan 10) Signage Plan 11) Design Review guideline 12) Refer to Mount Horeb Village Code Chapter 17- Zoning Code for all supporting details of required documentation. Please note Chapter 17 is the new adopted code Effective as of March 12, 2026 Page 6 of 224 DEVE LOPMENT APPLICATION AGREEMENT This Development Application Agreement (the “Agreement”) is made and entered into this day of , , by and between the Village of Mount Horeb, a Wisconsin municipal corporation (the “Village”), and (the “Applicant”). RECITALS A. The Applicant plans to file, or has filed, an application for approval by the Village of one or more of the following activities within the Village’s jurisdiction: site plan / conditional use permit / rezone / variance / other development (hereinafter refe rred to as the “Development”). B. The Village desires to review and take action on the Development in a timely manner in accordance with all applicable federal, state and local laws and regulations, and without unreasonable expense to Village taxpayers. C. The Applicant agrees and acknowledges that decisions and approvals regarding the Development are legislative determinations to be made in the Village’s discretion and that the Applicant’s compliance with this Agreement does not, in any way, entitle the Applicant to approval of the Development. D. The process of reviewing the plans and documents associated with the Development will cause the Village to incur direct and indirect expenses including, but not limited to, staff time and fees and expenses incurred by the Village for outside consultant ser vices related to review of the Development ( e.g., engineers, attorneys, accountants, planners, and other professionals). NO W, THEREFORE, for and in consideration of the mutual covenants contained herein, and for good and valuable consideration, the Village and the Applicant agree as follows: 1. Re citals. The representations and recitations set forth in the foregoing paragraphs are material to this Agreement and are hereby incorporated into and made a part of this Agreement as though they were fully set forth in this paragraph. 2. Appl icant to Reimburse Village Review Costs. The Applicant shall reimburse the Village for all direct and indirect costs and expenses related to the Village’s review of the Development. The direct and indirect costs and expenses include, but are not limited to, staff time and fees and expenses incurred by the Village for outside consultant services (e.g., engineers, attorneys, accountants, planners, and other professionals). For purposes of this Agreement, the direct and indirect costs and expenses shall be referred to as “Review Costs.” Village staff time shall be charged at current rates. Page 7 of 224 3. Deposit Required to Fund Reimbursement Account. a. To ensure that funds are readily available to the Village for reimbursement of the Review Costs as provided in paragraph 2 above, the Applicant shall deposit with the Village an amount determined by the Village Zoning Administrator to be used to pay the Re view Costs (the “Deposit”). The Village Zoning Administrator shall use the following table as a guide to determine the amount of the Deposit: (1) Small additions (<2,500 sf) shall require a $1,500 Deposit. (2) Small-sized projects (<5,000 sf) shall require a $3,500 Deposit. (3) Medium-sized projects (<10,000 sf) shall require a $5,500 Deposit. (4) Large-sized projects (>10,000 sf) shall require a $10,000 Deposit. (5) In addition to the amounts identified in (1) through (4), any Development that requires a development agreement or tax incremental financing assistance from the Village shall require an additional $5,000 to $10,000 Deposit. All Deposit amounts shall be determined by the Village Zoning Administrator in his/her sole discretion and are not subject to challenge by the Applicant. Generally small additions will be less than 2,500 square feet, small projects less than 5,000 square f eet, medium projects less than 10,000 square feet and large projects are over 10,000 square feet. b. The Applicant is responsible for payment of all Review Costs regardless of whether the amount exceeds the amount initially deposited with the Village. The Village reserves the right to require the Applicant to deposit additional amounts if the Village Zoning Administrator determines that additional amounts are necessary because of the size of the Development or because the Reimbursement Account (defined below) has been depleted. c. The Deposit may be provided in the form of cash, a certified check, cashier’s check, personal check, or some other form as approved by the Village. d. The required Deposit must be made by the Applicant upon execution of this Agreement. e. The Applicant agrees and acknowledges that the Village will not process the application(s) associated with the Development and that the Village may suspend or otherwise stop activities associated with the Development if the Applicant fails to comply with this Agreement. f. The Village shall place and maintain the Deposit in a segregated, non- interest- bearing account to be used solely for the purpose of reimbursing the Review Costs in accordance with paragraph 4 below (the “Reimbursement Account”). 2 Page 8 of 224 4. Village Withdrawals from the Reimbursement Account. a. After complying with the notification requirements of paragraph 4.b. below, the Village is entitled to make withdrawals from the Reimbursement Account to pay Review Costs in accordance with paragraph 2 above. b. Not less than 5 days prior to making any withdrawal from the Reimbursement Account, the Village shall provide the Applicant with an itemized invoice for Review Costs incurred, together with a written notice of the Village’s intent to withdraw such funds from the Reimbursement Account. c. Withdrawals from the Reimbursement Account may be made as often as necessary to reimburse the Review Costs. In the event that the balance of Applicant’s Reimbursement Account reaches $1,000 or less, the Village shall have the discretion to continue withdra wing funds from the Reimbursement Account; to invoice the Applicant directly for payment; or to require the Applicant to pay additional monies to the Village, which monies shall be deposited in the Reimbursement Account. Payments for directly invoiced bill s shall be due 30 days from the date the invoice is mailed to the Applicant. d. Any amounts remaining in the Reimbursement Account after the Village as taken final action on the Development and all Review Costs have been paid shall be promptly refunded to the Applicant. 5. Authority/Binding Effect . The parties agree that the undersigned signatories to this Agreement have full power and authority to act on behalf of the Village and the Applicant, and that all necessary and enabling resolutions have been enacted. This Agreement shall bind the heirs, successors and assigns of the Applicant and the Village. 6. Notification of Parties. Any notices to be provided under this Agreement may be made by delivery in person, by First Class mail, or by electronic mail (request a read receipt required) as provided below: To Village: Village of Mount Horeb Village Administrator 138 East Main Street Mount Horeb, WI 53572 Email: gabe.altenbernd@mounthorebwi.info 3 Page 9 of 224 To Applicant: Email: 7. Severability. If any provision of this Agreement is deemed invalid, then the invalidity of said provision shall not affect the validity of any other provision hereof. 8. A mendment, Withdrawal, or Release. This Agreement may be withdrawn, amended or released only by a written document duly executed by both parties. 9. E ffective Date. This Agreement shall be effective commencing on the date indicated in the first paragraph above. I N WITNESS WHEREOF, the parties have caused this Agreement to be executed by the duly authorized individuals and officers below. VILLAGE OF MOUNT HOREB By: ______________________ Village Administrator Gabe Altenbernd APPLICANT By: Print name: Title: 4 Owner/Developer Page 10 of 224 TRASH ELEV. STAIRS STAIRS APT. STAIR ENTRY 101 PARKING GARAGE 245'-10" 51 TOTAL PARKING SPACES BIKE PARKING 117'-0 1/2" ELEC. VERTICAL BIKE RACK 18'-0" 19'-7" 196'-8" 9'-6" 60'-7" 14'-0" 20'-7" 58'-3" 47'-2" 43'-5" TYP. 18'-0" 24'-0" 18'-0" 56'-0" ENTER ONLY EXIT ONLY 24'-4" 37'-0" 21'-0" HORIZONTAL RHYTHM SPACING 38'-6" 28'-10" 7'-1" 29'-3" 25'-10" 10'-6" 23'-6" APARTMENT AMMENITY 1,065 SF HOOD CHASE ABOVE COMMERCIAL SPACES BOMA CALC 7,307 SF COMMERCIAL SPACE BOMA CALC 2,874 SF B1 A301 B1 A301 A1 A302 A1 A302 C1 A302 C1 A302 C1 A301 C1 A301 73'-9" 43'-4" (22 STALLS) (10 STALLS) (7 STALLS) 2811 SF TENANT 1 1331 SF TENANT 2 1377 SF TENANT 3 4367 SF TENANT 4 WATER SERVICE & SPRINKLER RISER 44'-0" 44'-0" 8'-6" TYP. 9'-0" 8'-6" (7 STALLS) TYP. 9'-0" 9'-6" TYP. 9'-0" (4 STALLS) ONE WAY CONVEX SAFTEY MIRRORS ONE WAY ONE WAY 0' 3/8" 0' 4' 8' 16' 3/4" 1 1/2" SCALE: 3/32" = 1' -0" 2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570 © SKETCHWORKS ARCHITECTURE, LLC, 2024 LANGHUS ON MAIN FLOOR PLANS 1 OF 8 DATE: 10/26/26 PLAN NORTH TRUE NORTH ROTATION FIRST FLOOR • RESIDENTIAL UNITS: 42 TOTAL • PARKING STALLS: 51 TOTAL • BIKE PARKING: 53 TOTAL • COMMERCIAL SPACE: 10,181 SF (LEASEABLE BOMA CALC TOTAL) FIRST FLOOR PLAN - COMMERCIAL SPACE, TENANT PARKING Page 11 of 224 SHOWER REF SHOWER SHOWER REF REF SHOWER REF SHOWER SHOWER REF REF REF REF REF SHOWER REF SHOWER SHOWER REF REF REF REF REF SHOWER REF SHOWER REF SHOWER SHOWER REF SHOWER REF REF SHOWER SHOWER 889 SF 1 BED / DEN 555 SF STUDIO 642 SF STUDIO 1128 SF 2 BED 717 SF 1 BED 1104 SF 2 BED 764 SF 1 BED 958 SF 1 BED / DEN 1173 SF 2 BED 726 SF 1 BED 834 SF 1 BED 877 SF 1 BED 807 SF 1 BED 692 SF 1 BED 686 SF 1 BED 749 SF 1 BED 747 SF 1 BED 1105 SF 2 BED 1511 SF STORAGE STAIR STAIR ELEV ELEV LOBBY 1139 SF 1 BED / DEN 80 SF CHASE A1 A301 A1 A301 TYPE A UNIT 805 SF STORAGE 652 SF MECH 1132 SF GYM 2 BED B1 A301 B1 A301 1114 SF 14 UNITS 30 UNITS A1 A302 A1 A302 C1 A302 C1 A302 C1 A301 C1 A301 0' 3/8" 0' 4' 8' 16' 3/4" 1 1/2" SCALE: 3/32" = 1' -0" 2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570 © SKETCHWORKS ARCHITECTURE, LLC, 2024 LANGHUS ON MAIN FLOOR PLANS 2 OF 8 DATE: 10/26/26 PLAN NORTH TRUE NORTH ROTATION SECOND FLOOR 20 TOTAL UNITS a. (2) STUDIO • GROSS SF: 1,193 b. (10) 1 BED • GROSS SF: 7,599 c. (3) 1 BED / DEN • GROSS SF: 2,986 d. (5) 2 BED • GROSS SF: 5,604 GYM STORAGE MECHANICAL SECOND FLOOR CONCEPT PLAN Page 12 of 224 SHOWER REF SHOWER REF SHOWER REF SHOWER REF REF SHOWER REF REF SHOWER SHOWER REF REF SHOWER REF REF REF REF REF REF SHOWER REF SHOWER REF SHOWER REF SHOWER REF SHOWER REF SHOWER REF SHOWER REF SHOWER 762 SF 1 BED 756 SF 1 BED 785 SF 1 BED 726 SF 1 BED 1163 SF 2 BED 717 SF 1 BED 1129 SF 2 BED 641 SF STUDIO 555 SF STUDIO 848 SF 1 BED / DEN 807 SF 1 BED 587 SF STUDIO 591 SF STUDIO 765 SF 1 BED 765 SF 1 BED 564 SF COMMUNITY ROOM 749 SF 1 BED STAIR ELEV ELEV LOBBY STAIR 767 SF 1 BED A1 A301 A1 A301 701 SF STUDIO 863 SF 1 BED / DEN 1118 SF 2 BED 104'-10" 63'-5" 19'-0" TO PROP. LINE 60'-3" 590 SF STUDIO 77 SF CHASE EXIT 834 SF 1 BED B1 A301 B1 A301 2818 SF COMMUNITY PATIO TYPE A A1 A302 A1 A302 C1 A302 C1 A302 C1 A301 C1 A301 0' 3/8" 0' 4' 8' 16' 3/4" 1 1/2" SCALE: 3/32" = 1' -0" 2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570 © SKETCHWORKS ARCHITECTURE, LLC, 2024 LANGHUS ON MAIN FLOOR PLANS 3 OF 8 DATE: 10/26/26 PLAN NORTH TRUE NORTH ROTATION THIRD FLOOR - CONCEPT PLAN THIRD FLOOR 22 TOTAL UNITS a. (6) STUDIO • GROSS SF: 3,661 b. (11) 1 BED • GROSS SF: 8,433 c. (2) 1 BED / DEN • GROSS SF: 1,711 d. (3) 2 BED • GROSS SF: 3,400 COMMUNITY ROOM COMMUNITY PATIO Page 13 of 224 T.O. TRUSS 137' -11 3/4" FIRST FLOOR 100' -0" 2 6 7 10 20 13 14 15 21 FOREGROUND OUTLINE OF MHTC BUILDING MAX BUILDING HEIGHT 140' -0" PARAPET MAX. 145' -0" 16 1 19 12 7 24 25 14 A1 A302 A1 A302 C1 A302 C1 A302 T.O. TRUSS 137' -11 3/4" FIRST FLOOR 100' -0" 1 5 6 7 2 5 16 15 14 21 14 15 25 13 15 17 1 15 22 17 20 OUTLINE OF MHTC BUILDING 23 MAX BUILDING HEIGHT 140' -0" 3 3 B1 A301 B1 A301 PARAPET MAX. 145' -0" 6'-0" 1 11 18 18 8 8 218 12 11 4 4 24 7 20 8 15 C1 A301 C1 A301 STONE BENCH 0' 1/4" 0' 2' 4' 8' 1/2" 1" SCALE: 1/8" = 1' -0" 2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570 © SKETCHWORKS ARCHITECTURE, LLC, 2024 LANGHUS ON MAIN ELEVATIONS 4 OF 8 DATE: 10/26/26 WEST ELEVATION - COLORED SOUTH ELEVATION - COLORED EXTERIOR ELEVATIONS KEYNOTE SCHEDULE # DESCRIPTION COLOR 1 CLAY BRICK MASONRY - FULL BED RED/BROWN BLEND COUNT RY CLUB -TUMBLED - ACME BRICK 2 CLAY BRICK MASONRY - RED TONE ASHBURY - BRICKCRAFT 3 CLAY BRICK MASONRY - TAN/ BROWN BLEND CEDAR CREEK - BRICKCRAFT 4 CLAY BRICK MASONRY - TAN/ BROWN CEDAR CREEK SOLDIER COURSING 5 LIMESTONE MASONRY HILLCREST STONE - WHEAT 6 LP SMARTSIDE SIDING - BOARD AND BATTEN SHERWIN WILL IAMS - ROYCROFT MIST GRAY 7 LP SMARTSIDE - BOARD AND BATTEN SHERWIN WILLIAMS - HAMMERED SILVER 8 LP SMARTSIDE LAP SIDING SHERWIN WILLIAMS - SEALSKIN 9 LP SMARTSIDE LAP SIDING DESERT STONE 10 CONCRETE MASONRY UNIT BUFF - COUNTY MATERIALS 11 ARCHITECTURAL PANEL SIDING SHERWIN WILLIAMS - PEWT ER GREEN 12 <varies> BRONZE FINISH 13 CORBLE ACCENT PANEL SHERWIN WILLIAMS - SEALSKIN 14 METAL BALCONY AND RAILING MEDIUM - DARK BRONZE 15 CONCRETE MASONRY COPING LIGHT GREY/ CONCRETE 16 LP SMARTSIDE - TRIM BOARDS DESERT STONE 17 COMPOSITE WOOD TRIM BOARDS, DECORATIVE SHERWIN WIL LIAMS - SEALSKIN 18 TRIM ACCENTS SHERWIN WILLIAMS - ROOKWOOD BLUE GREE N 19 CEDAR SHAKE ROOF MEDIUM - LIGHT WOOD 20 METAL CANOPY BRONZE TONE 21 FABRIC AWNING COLOR TBD PER TENANT 22 LINTEL OVER WINDOWS AND OPENINGS MEDIUM - LIGHT MA SONRY UNIT OR FAUX WOOD ELEMENT 23 GREEN ROOF LIFEROOF PRODUCT OR SIMILAR 24 CORBLE ACCENT PANEL SHERWIN WILLIAMS - CREAMY 25 CORBLE ACCENT PANEL SHERWIN WILLIAMS -TAWNY TAN Page 14 of 224 ALLEY 106' -7" 6 7 10 13 14 7 6 7 8 10 13 11 14 15 ELECTRICAL METERS LOUVER GAS METERS LOUVERS MAX BUILDING HEIGHT 140' -0" EXIT ONLY AT GARAGE DOOR B1 A301 B1 A301 PARAPET MAX. 145' -0" 8 11 11 C1 A301 C1 A301 SAFTEY MIRRORS ALLEY 106' -7" T.O. TRUSS 137' -11 3/4" FIRST FLOOR 100' -0" 1 15 13 7 19 14 17 18 22 17 9 13 20 MAX BUILDING HEIGHT 140' -0" 3 ENTRANCE ONLY AT GARAGE DOOR PARAPET MAX. 145' -0" 16 6 10 4 15 8 15 17 17 A1 A302 A1 A302 C1 A302 C1 A302 0' 1/4" 0' 2' 4' 8' 1/2" 1" SCALE: 1/8" = 1' -0" 2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570 © SKETCHWORKS ARCHITECTURE, LLC, 2024 LANGHUS ON MAIN ELEVATIONS 5 OF 8 DATE: 10/26/26 NORTH ELEVATION - COLORED EAST ELEVATION - COLORED EXTERIOR ELEVATIONS KEYNOTE SCHEDULE # DESCRIPTION COLOR 1 CLAY BRICK MASONRY - FULL BED RED/BROWN BLEND COUNT RY CLUB -TUMBLED - ACME BRICK 2 CLAY BRICK MASONRY - RED TONE ASHBURY - BRICKCRAFT 3 CLAY BRICK MASONRY - TAN/ BROWN BLEND CEDAR CREEK - BRICKCRAFT 4 CLAY BRICK MASONRY - TAN/ BROWN CEDAR CREEK SOLDIER COURSING 5 LIMESTONE MASONRY HILLCREST STONE - WHEAT 6 LP SMARTSIDE SIDING - BOARD AND BATTEN SHERWIN WILL IAMS - ROYCROFT MIST GRAY 7 LP SMARTSIDE - BOARD AND BATTEN SHERWIN WILLIAMS - HAMMERED SILVER 8 LP SMARTSIDE LAP SIDING SHERWIN WILLIAMS - SEALSKIN 9 LP SMARTSIDE LAP SIDING DESERT STONE 10 CONCRETE MASONRY UNIT BUFF - COUNTY MATERIALS 11 ARCHITECTURAL PANEL SIDING SHERWIN WILLIAMS - PEWT ER GREEN 12 <varies> BRONZE FINISH 13 CORBLE ACCENT PANEL SHERWIN WILLIAMS - SEALSKIN 14 METAL BALCONY AND RAILING MEDIUM - DARK BRONZE 15 CONCRETE MASONRY COPING LIGHT GREY/ CONCRETE 16 LP SMARTSIDE - TRIM BOARDS DESERT STONE 17 COMPOSITE WOOD TRIM BOARDS, DECORATIVE SHERWIN WIL LIAMS - SEALSKIN 18 TRIM ACCENTS SHERWIN WILLIAMS - ROOKWOOD BLUE GREE N 19 CEDAR SHAKE ROOF MEDIUM - LIGHT WOOD 20 METAL CANOPY BRONZE TONE 21 FABRIC AWNING COLOR TBD PER TENANT 22 LINTEL OVER WINDOWS AND OPENINGS MEDIUM - LIGHT MA SONRY UNIT OR FAUX WOOD ELEMENT 23 GREEN ROOF LIFEROOF PRODUCT OR SIMILAR 24 CORBLE ACCENT PANEL SHERWIN WILLIAMS - CREAMY 25 CORBLE ACCENT PANEL SHERWIN WILLIAMS -TAWNY TAN Page 15 of 224 2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570 © SKETCHWORKS ARCHITECTURE, LLC, 2024 LANGHUS ON MAIN EXTERIOR MATERIALS 6 OF 8 DATE: 10/26/26 Page 16 of 224 2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570 © SKETCHWORKS ARCHITECTURE, LLC, 2024 LANGHUS ON MAIN RENDERINGS 7 OF 8 DATE: 10/26/26 EXISTING TREES TO REMAIN ON SITE Page 17 of 224 2501 PARMENTER STREET, SUITE 300A ○ MIDDLETON, WI 53562 ○ 608-836-7570 © SKETCHWORKS ARCHITECTURE, LLC, 2024 LANGHUS ON MAIN RENDERINGS 8 OF 8 DATE: 10/26/26 Page 18 of 224 Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com LANGUS ON MAIN MOUNT HOREB – MAIN ST MIXED USE BLDG September 30, 2026 Page 1 Langhús on Main Mixed Use Residential/Commercial Development Infill Project 220 East Main Street, Mount Horeb September 30, 2026 On behalf of the Owner and Developer, Jeff Grundahl, please accept this revised submittal for a proposed mixed-use residential development at 220 East Main Street, Mount Horeb, WI. Project Team: Developer: Jeff Grundahl, (or assigns) 455 S Junction Road Madison, WI 53719 608-237-1730 jeff@jgdevelopment.com Architect: Sketchworks Architecture, LLC Steve Shulfer, AIA, Partner|CEO 2501 Parmenter Street, suite 300A Middleton, WI 53562 608-836-7570 sshulfer@sketchworksarch.com Surveyor & Civil Engineer: Wyser Engineering Wade Wyse P.E. 312 E Main Street Mount Horeb, WI 53572 608-843-3388 wade.wyse@wyserengineering.com Property Manager: The Gallina Companies Dawn Hendrickson 101 East Main Street, Suite 500 Mount Horeb, WI 53572 608-237-1300 dhendrickson@gallinacos.com Traffic Analysis TADI (Traffic Analysis & Design, Inc.) Don Lee, PE PO Box 128 Cedarburg, WI 53012 414.517.5014 dlee@tadi-us.com Page 19 of 224 Sketchworks Architecture, LLC | 2250 Parmenter St, Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com LANGUS ON MAIN MOUNT HOREB – MAIN ST MIXED USE BLDG September 30, 2026 Page 2 Land / Parcels: There are three parcels on Main Street, Mount Horeb that are in consideration for this project: • 208 E Main Street (currently vacant) o BOECK'S, CARL SURVEY & PLAT MT HOREB STATION PLAT OF BLK 1-11 BLOCK 6 LOTS 5, 6, 7 & 8 • 214 E Main Street (currently a small commercial property, formerly residential) o BOECK'S, CARL SURVEY & PLAT OF MT HOREB STATION PLAT BLOCK 6 LOTS 9, 10 & 11 • 220 E Main Street (currently a small commercial property, formerly residential) o BOECK'S, CARL SURVEY & PLAT MT HOREB STATION PLAT OF BLK 1-11 BLOCK 6 LOTS 12, 13 & 14 Property size: 253.4’ x 125.3’ +/- (regular) = 31,653 square feet (0.73 acres) Property Zoned as: DMU - Downtown Mixed Use Page 20 of 224 Sketchworks Architecture, LLC | 2250 Parmenter St, Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com LANGUS ON MAIN MOUNT HOREB – MAIN ST MIXED USE BLDG September 30, 2026 Page 3 Current Zoning assessment and Development needs: This project reflects the desired zoned use for the site and activates a previously under utilized section of the downtown Main Street. Accessible commercial tenant spaces along the Main Street frontage blend into the established cadence of buildings throughout the street. Key building statistics include: • Three stories, 40’ tall • 28,392 sf footprint • 9,507 sf commercial + 730 sf lobby • 37,241 sf residential • Amenity spaces: o 2,315 sf tenant private secure storage (second floor) o 1,134 sf fitness center (second floor) o 564 sf tenant community room (third floor) o 2,818 sf tenant community outdoor patio • 42 units • 54 parking stalls, internal to the building • 1.28:1 ratio of stalls to units; 1.08:1 ratio of stalls to bedrooms • 49 bicycle parking stalls (38 wall, 11 floor) Page 21 of 224 Sketchworks Architecture, LLC | 2250 Parmenter St, Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com LANGUS ON MAIN MOUNT HOREB – MAIN ST MIXED USE BLDG September 30, 2026 Page 4 In 2026, the Langhus on Main project has been redesigned to accomidate the recently updated Municipal Zoning Code for Mount Horeb and requires no provisons or alterations to the code. Significant building attributes modified since the previous submittal: • Modified elevations to accomidate new zoning requirements o Vertical articulation requirements for south façade ▪ Visually appears as eight individual buildings and storefronts, with a maximum forty-foot width for each vertical articulation ▪ Introduced gabled roofline on south façade, additional material changes and changes in the roof line to break up the façade and add interest to the building o Material changes, colors, and window sizing throughout • Increased commercial square footage o 1/3 of total buidling depth totaling to 9,515 SF • Decreased number of apartment units o 42 total units, originally 66 units, (11/25 submittal ~ 44) • Added resident storage to second and third floors as convenience to tenants • Parking garage modified to meet new zoning requirements • Three story maximum height o Original submittal included 4 stories • Height reduced to 40-feet to meet new zoning requirements • Increased community shared space to meet new zoning requirements • Second floor expanded to utilize entire building footprint to allow for the following: o Indoor work out space o Residential storage units o Increased MEP area o Third floor outdoor space for better access to natural light • Indoor communitiy room with kitchen • Outdoor community patio with access to community room o Tenant patios seperated by landscape planters • Third floor at west end stepped back to in response to neighboring building concerns • East façade introduces gabled elements at pedestrian level to ease into the neighborhoods north of the site • Northeast corner scaled back for better transition to North neighbors. Bringing this corner to life with residents and consumers will activate more businesses in the heart of downtown without additional parking constraints. Bike storage in the building encourages use of alternative transportation and use of extablished bike paths in the area. The shared community spaces will encourage residents to get to know their neighbors furthering the sense of a belonging in the community. Page 22 of 224 Sketchworks Architecture, LLC | 2250 Parmenter St, Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com LANGUS ON MAIN MOUNT HOREB – MAIN ST MIXED USE BLDG September 30, 2026 Page 5 Southeast Corner at Main St. & Third St. Community Patio Space Page 23 of 224 Sketchworks Architecture, LLC | 2250 Parmenter St, Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com LANGUS ON MAIN MOUNT HOREB – MAIN ST MIXED USE BLDG September 30, 2026 Page 6 Summary of Zoning Code Regulations: (adopted March 2026) Code / Section Assessment Section 17.02.10 DMU Downtown Mixed-Use Zoning District MEETS CRITERIA Section 17.03.03(2) Number of Principal Buildings per Lot MEETS CRITERIA Section 17.03.03(4) Number of Land Uses per Building MEETS CRITERIA Section 17.03.03(9) Site Plan Review Required MEETS CRITERIA Section 17.03.03(10) Procedural Regulations MEETS CRITERIA Section 17.03.03(11) Demolition of a Principal Structure MEETS CRITERIA Section 17.03.05 Table of Land Uses SEE MIXED USE BUILDING Section 17.03.06 Residential Land Uses DEFAULT TO MIXED USE CRITERIA Section 17.03.08(2) Mixed-Use Building MEETS CRITERIA AS A MIXED USE BUILDING Section 17.03.08(a) MEETS CRITERIA DENSITY AND BULK REQMNTS Section 17.03.08(b)1 DOESN’T APPLY, THIS IS IN DMU DISTRICT Section 17.03.08(b)2a MEETS ALL CRITERIA – NO RESIDENTIAL W/IN 35% LOT DEPTH Section 17.03.08(b)2b MEETS ALL CRITERIA – LOBBY FROM MAIN ST Section 17.03.08(b)2c MEETS ALL CRITERIA – EXCEEDS GROUND LEVEL MINIMUM Section 17.03.08(b)2d MEETS ALL CRITERIA – PARKING NOT IN 30 FOOT AND 35% LOT DEPTH Section 17.03.08(d) MEETS ALL CRITERIA Section 17.04.12 Bulk Dimensions MEETS CRITERIA Section 17.04.20 Height Exceptions MEETS CRITERIA – SCREENING PARAPET <5’ ABOVE ROOF, ROOF 40’ MAX. Section 17.06.06 Parking MEETS CRITERIA – > 1.2 STALLS PER D.U. Section 17.06.07 Loading DMU DISTRICT, LOADING ZONE ON THIRD STREET Section 17.06.20 Lighting LIGHTING PLAN MEETS ZONING REQUIREMENTS Section 17.06.43 Recreation Space MEETS CRITERIA – RECREATION SPACE PROVIDED, CLUBHOUSE & PATIO Section 17.07.01 Exterior Building Design MEETS CRITERIA Section 17.07.50 DMU Design Standards MEETS CRITERIA Article VIII Landscaping Requirements EXEMPT FROM LANDSCAPING REQUIREMENTS Page 24 of 224 Sketchworks Architecture, LLC | 2250 Parmenter St, Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com LANGUS ON MAIN MOUNT HOREB – MAIN ST MIXED USE BLDG September 30, 2026 Page 7 Allowable Property Use: Section 17.02.10: Zoning Districts (12) (DMU) Downtown Mixed-Use Zoning District (a) Intent. This district is intended to permit downtown commercial and mixed-use development at an intensity which provides significant incentives for infill development, redevelopment, and the continued economic viability of existing development in a downtown development pattern that is compatible with traditional “Main Street” characteristics of Downtown Mount Horeb. Residential uses are intended to occur at a density that can be accommodated within the bulk requirements of this zoning district. ASSESSMENT: MEETS CRITERIA Section 17.02.22: Historic Preservation Overlay Zoning District (No map found in Zoning Code or online in Village GIS mapping.) Section 17.03.03: Regulations Applicable to All Land Uses (2) Number of Principal Buildings per Lot (b) …a maximum of one principal building shall be permitted on any one lot… ASSESSMENT: MEETS CRITERIA (4) Number of Land Uses per Building. Any number of land uses that are permitted by right can be combined within a building or on a given lot, per the limitations of those individual uses. Any number of land uses that require a conditional use permit can be combined within a building or on a given lot, per the limitations of those individual uses and with each approved through the conditional use process (Section 17.10.32). ASSESSMENT: MEETS CRITERIA (9) Site Plan Review Required. All development involving physical modifications to a site including but not limited to new developments, building additions, alterations, or removal; and additions to paving are subject to site plan review and approval in accordance with Section 17.10.43 of this Chapter, except for single family and two-family dwelling units in any zoning district. The establishment of a Pocket Neighborhood land use requires Site Plan approval. ASSESSMENT: MEETS CRITERIA (10) Procedural Regulations and Requirements. All land use and development of land shall comply with all requirements of Article X, pertaining to the procedures necessary to secure review and approval of land use and development. Such regulations and restrictions address Page 25 of 224 Sketchworks Architecture, LLC | 2250 Parmenter St, Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com LANGUS ON MAIN MOUNT HOREB – MAIN ST MIXED USE BLDG September 30, 2026 Page 8 both procedural and technical requirements. ASSESSMENT: MEETS CRITERIA (11) Demolition of a Principal Structure. Where a principal structure has been removed, all driveways, paved areas, and below grade improvements on the lot shall be removed. All public utilities shall be abandoned at their connection with the main unless written exception is obtained from the Village Engineer. All demolition activities shall be in accordance with the Village of Mount Horeb Municipal Code and all State and Federal regulations. Asbestos abatement and removal of any other hazardous materials, when required, must be documented before any demolition activity takes place. Applicant shall provide building inspector proof of liability insurance. Proof of proper abandonment of all utilities and proof of notification of police and public works as required. Applicant shall notify diggers hotline (dial 811) prior to commencing any scraping, excavating, or boring. ASSESSMENT: MEETS CRITERIA Section 17.03.05: Table of Land Uses: Downtown Mixed Use (DMU): Permitted Uses: (only those relevant to this project are listed below) Live/Work Unit Mixed Use Building Artisan Production Shop Bed and Breakfast Commercial Indoor Lodging Commercial Kitchen Indoor Commercial Entertainment Indoor Maintenance Service Indoor Sales of Services Office Personal or Professional Service Communications Antenna Electric Vehicle Charging Home Occupation Incidental Indoor Sales Incidental Light Industrial Incidental Outdoor Display and Sales On-Site Parking Lot On-Site Structured Parking Personal Antenna and Towers Satellite Dish Short-Term Residential Rental Small Solar Energy System Arbor/Trellis Awning Canopy Bay Window/Balcony Eves dn Gutters Fire Escape Flagpole Fountain Garden, Residential Composting, Raised Garden Bed, Landscape Area, Rain Garden, or Bioswale Mechanical Equipment Patio/Freestanding or Detached Deck Refuse Enclosure Walkway/Steps Page 26 of 224 Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com LANGUS ON MAIN MOUNT HOREB – MAIN ST MIXED USE BLDG September 30, 2026 Page 9 ASSESSMENT: SEE MIXED USE BUILDING Section 17.03.06: Residential Land Uses (1) Apartment/Multiplex: This dwelling unit type consists of a single structure with three or more individual attached dwelling units. ASSESSMENT: DEFAULT TO MIXED USE CRITERIA Section 17.03.08: Mixed-Use Buildings (2) Mixed-Use Building: A building containing a mix of principal nonresidential land uses and principal residential land uses. ASSESSMENT: MEETS CRITERIA AS A MIXED USE BUILDING Regulations: (a) Both uses are subject to the density, intensity, and bulk requirements of Article II. ASSESSMENT: MEETS CRITERIA OF DENSITY AND ALL BULK REQUIREMENTS (b) Land Use Minimums. 1. For any lot not located within the Downtown Mixed-Use District, … ASSESSMENT: DOESN’T APPLY, THIS IS IN DMU DISTRICT 2. For any lot located within the Downtown Mixed-Use District, no residential land uses are permitted on the ground floor unless such use is located a minimum of 30 feet or 35% of the lot depth as measured from the street right-of-way lot line directly abutting Main Street, Front Street, South First Street, and South Second Street, whichever is greater, as determined by the Plan Commission. See Figure 17.03.08b below. a. Lots with multiple street frontages. i. The minimum 30 foot or 35% lot depth requirement shall not be required along any property line directly abutting a public or private alleyway. ASSESSMENT: MEETS ALL CRITERIA – NO RESIDENTIAL W/IN 35% LOT DEPTH b. The lobby or entryway spaces intended for use by both residential and nonresidential land uses shall be permitted within the 30 foot or 35% lot depth requirement above. ASSESSMENT: MEETS ALL CRITERIA – LOBBY FROM MAIN ST c. Nonresidential land uses are permitted to exceed ground level minimums and be located on any floor of the structure so long as the ground level minimum requirement is met. Page 27 of 224 Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com LANGUS ON MAIN MOUNT HOREB – MAIN ST MIXED USE BLDG September 30, 2026 Page 10 ASSESSMENT: MEETS ALL CRITERIA – EXCEEDS GROUND LEVEL MINIMUM d. For avoidance of doubt, parking is prohibited in the areas identified as requiring nonresidential land uses. ASSESSMENT: MEETS ALL CRITERIA – PARKING NOT IN 30 FOOT AND 35% LOT DEPTH (c) Minimum and maximum required parking: See Section 17.06.06. (and shown below) (d) Mixed-Use Buildings shall comply with the design standards for commercial and mixed-use land uses. See Section 17.07.30. See Section 17.06.43 for on-site recreation space requirements. ASSESSMENT: MEETS ALL CRITERIA Section 17.04.12 Table of Bulk Dimensions – Mixed Use Zoning Districts Maximum Impervious Surface Percentage 100% ASSESSMENT: MEETS CRITERIA Maximum Lot Dwelling Unit Density None ASSESSMENT: MEETS CRITERIA Minimum Lot Area None ASSESSMENT: MEETS CRITERIA Minimum Lot Width None ASSESSMENT: MEETS CRITERIA Minimum Lot Frontage at Right of Way None ASSESSMENT: MEETS CRITERIA Minimum Front Yard and Street Side Corner Setback Min: 0 ft , Max: 10 ft ASSESSMENT: MEETS CRITERIA Minimum Side Yard Setback – Interior Min: 0 ft , Max: 10 ft ASSESSMENT: MEETS CRITERIA Minimum Rear Yard Min: 0 ft , Max: 10 ft ASSESSMENT: MEETS CRITERIA Maximum Building Height Max: 40 ft and 3 stories (note 5’ added parapet and mechanical screening allowances) ASSESSMENT: MEETS CRITERIA (3 stories, <40 ft, plus screening parapet) Minimum Building Separation (same lot) See Building Code ASSESSMENT: DOESN’T APPLY Minimum Principal Dwelling Unit Structure Area See Building Code ASSESSMENT: MEETS CRITERIA Page 28 of 224 Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com LANGUS ON MAIN MOUNT HOREB – MAIN ST MIXED USE BLDG September 30, 2026 Page 11 Minimum Front-Loaded Garage Setback Even w/ or behind principal Building ASSESSMENT: MEETS CRITERIA Minimum Pavement Setbacks 0 ft ASSESSMENT: MEETS CRITERIA Section 17.04.20: Exceptions to Maximum Height Regulations (1) Minor Projections. The following are permitted to exceed the maximum height regulations within any district where permitted: (text omitted that doesn’t apply)... The provisions of this Chapter shall not apply to prevent the erection above the building height limit of a parapet wall or cornice for ornament (and without windows) extending above such height limit not more than 5 feet. Such features, however, shall be erected only to such height as is necessary to accomplish the purpose they are to serve and subject to the Wisconsin state building code. (2) Additional Height for Roof Design or Non-Residential Space on the Ground Level. An Apartment/Multiplex, Townhouse, Live/Work, or Mixed-Use Building may exceed the maximum height regulations by up to a total of six (6) feet within any district where the land use is permitted, if either of the following conditions is met: (a) The structure is designed with a gable, hip, or gambrel roof with a pitch of at least 6/12. (b) A Mixed-Use Building may increase the floor-to-ceiling height of the ground level, but then the building is not eligible for additional height for roof design. ASSESSMENT: MEETS CRITERIA – SCREENING PARAPET EXTENDS <5’ ABOVE ROOF Parking requirements: Section 17.06.06 Per “DMU, Downtown Mixed USe”: Mixed Use: All Land Uses Per the minimum of each individual land use DMU Zoning Land uses other than Residential None Residential Land Uses 1.2 per dwelling unit ASSESSMENT: MEETS CRITERIA – > 1.2 STALLS PER DWELLING UNIT PARKING DIMENSIONAL STANDARDS MEET VILLAGE CRITERIA Section 17.06.07: Off-Street Loading Standards ASSESSMENT: DMU DISTRICT, LOADING ZONE ON THIRD STREET Section 17.06.20: Exterior Lighting Standards ASSESSMENT: LIGHTING PLAN MEETS ZONING REQUIREMENTS Section 17.06.43: On-Site Recreational Space Requirements Page 29 of 224 Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com LANGUS ON MAIN MOUNT HOREB – MAIN ST MIXED USE BLDG September 30, 2026 Page 12 (1) On-Site Recreational Space Requirements for Multi-Family and Mixed-Use Land Uses. (a) Each multi-family or mixed-use development containing 3 or more dwelling units shall provide on-site recreational space suitable for inside or outside gathering space or recreation. This space could include a children’s play area, outdoor gazebo or sitting area, indoor gathering/community spaces, indoor fitness center, and/or shared outdoor porch, balcony, or rooftop terrace. On-site recreational space may be provided at ground level, in the building, or other areas including but not limited to communal porches/decks, balconies, and rooftops. (b) Minimum Area. A minimum of 200 square feet per building plus 25 square feet per bedroom of usable recreation space shall be provided. (c) Required on-site recreational space shall be for the private use of residents and need not be open to the public. (2) Required on-site recreational space may be divided into multiple distinct spaces, provided that no single space is smaller than 100 square feet or narrower than 10 feet in any direction. (3) The following will not count towards meeting the on-site recreational requirement: (a) Outdoor areas in the required front yard or street side yard setbacks. (b) Outdoor areas used for on-site parking or traffic circulation. (c) Outdoor or indoor areas used for landscaping, stormwater infiltration, bicycle parking, trash and recycling storage, or mechanical equipment. (4) Required on-site recreational space shall not count toward land dedication or fee in lieu of land dedication requirements of Village of Mount Horeb Ordinance Fee Schedule. ASSESSMENT: MEETS CRITERIA – RECREATION SPACE PROVIDED, CLUBHOUSE & PATIO ARTICLE VII: EXTERIOR BUILDING DESIGN STANDARDS Section 17.07.01: Purpose and Applicability (1) Purpose. The purpose of this Section is to regulate the design and materials used for the exterior of buildings and structures within the Village so as to maintain and enhance the attractiveness and values of property in the community. This Article is further intended to support the creation of a pedestrian-oriented urban environment that emphasizes architectural and urban design principles of human scale and visual interest. Additionally, this Article is intended to ensure the development of structures that maintain a long-lasting appearance; withstand the effects of time and exposure to the elements; resist damage in areas with high vehicular and pedestrian traffic and in areas where larger equipment that could cause damage is commonly used; that maintain a consistent character of development based on land use and zoning district particular to each development; and that contribute to the long-term economic and social vitality of the Village of Mount Horeb. (2) Applicability. Telecommunication, Extraction and Disposal, Energy Production, and Agricultural land uses are exempt from the exterior design standards in Sections 17.07.10 to 17.07.50 below. Page 30 of 224 Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com LANGUS ON MAIN MOUNT HOREB – MAIN ST MIXED USE BLDG September 30, 2026 Page 13 (a) New Construction. The requirements of this Section shall apply to all structures and buildings within the Village constructed after the effective date of this Chapter. (b) Additions. (omitted, doesn’t apply) (c) Alterations. (omitted, doesn’t apply) (d) Exceptions and Appeals. 1. Exceptions. Exceptions to the building design standards set forth in this Section may be granted by the Zoning Administrator, to permit substitute building materials or construction of comparable quality or design when it can be demonstrated that the provisions of this Section are infeasible and that the granting of such exception is in keeping with the purpose of this Section. Decisions rendered by the Zoning Administrator may be appealed to the Plan Commission. 2. Appeals. Any person affected by a decision of the Zoning Administrator may petition for a hearing before the Plan Commission. 3. Waivers. The Plan Commission is authorized to grant one or more waivers for specific design requirements in this Section when the Plan Commission finds the design to constitute an exemption as described above in subsection (1) or finds an alternative design standard also achieves the Purpose of this Section. a. Granting of waivers by the Plan Commission shall be identified within the conditions of approval as part of the design review component of any Site Plan review (Section 17.10.43). (e) Beyond the rules in this Section, additional building design standards may apply to: 1. Conditional Use Permits (see Section 17.10.32) 2. Planned Unit Development Districts (see Section 17.0.2.11) (3) Review and Approval. Through the site plan review and building permit processes, the Zoning Administrator shall be responsible and have authority to hear, review, and act upon all proposed exterior architectural plans for all proposed development. (4) Exterior Building Materials. The 4 classes of building materials referenced in this Chapter have the following meanings: (a) Class I materials include brick, brick veneer, stone, stone veneer, and glass curtain/storefront). (b) Class II materials include split face or decorative block, and stucco. (c) Class III materials include architectural/decorative metal panels, EIFS, residential aluminum siding, and siding made of wood, wood composite, vinyl, or fiber cement. (d) Class IV materials include smooth face or non-decorative block; concrete panels (tilt- up or precast); asphaltic, fiberglass, metal, or poly-roofing siding; non-decorative metal panels; corrugated metal; and plywood, chipboard, or other non-decorative wood. Also includes any material not listed in (a) through (c) above. Any Exterior Change Within the Downtown Mixed Use Zoning District - See Section 17.07.50 ASSESSMENT: MEETS CRITERIA Page 31 of 224 Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com LANGUS ON MAIN MOUNT HOREB – MAIN ST MIXED USE BLDG September 30, 2026 Page 14 Section 17.07.50: DMU Zoning District Design Standards These standards apply to any land use, building, and structure within the Downtown Mixed Use zoning district constructed or altered after the effective date of this Chapter. (2) Applicability. The regulations of this Section shall apply to new development and changes to the exterior of any building within the mapped boundaries of the Downtown Mixed Use zoning district. (4) Design Theme: The design theme for the Downtown Mixed Use Zoning District is based on its historical, pedestrian-oriented development pattern that incorporates retail, residential, and institutional uses. Building orientation and character includes minimum setbacks at the edge of the sidewalk, use of alleys for access (if possible), and on-street or other off-site parking. The design theme is characterized by a variety of architectural styles popular at the time, including Italianate, Romanesque, and Neoclassical, in formats with office, storage, or residential located over commercial. The façades of these buildings have a traditional main street storefront appearance that can vary in scale depending on location and surroundings, have street yard and side yard setbacks of zero feet, have prominent horizontal and vertical patterns formed by regularly spaced window and door openings, detailed cornice designs, rich detailing in masonry coursing, window detailing and ornamentation, and are predominately brick, stone, or wood. Exterior building materials are of high quality. Exterior appurtenances are minimal. Exterior colors are harmonious, simple, and muted. Exterior signage blends, rather than contrasts, with buildings in terms of coloring (complementary to building), location (on-building), size (small), and number (few). ASSESSMENT: MEETS CRITERIA (5) Design Standards for Project Review (New Construction, Building Additions, and Building Alterations). (a) The design standards contained in this Subsection shall apply to all changes meeting the criteria for Project Review (including all new buildings, building additions, and new building appurtenances). Such activities shall correspond to the following: 1. The following requirements for building setback; height; building mass; horizontal rhythms (created by the placement and design of façade openings and related elements such as piers, columns); vertical rhythms (created by the placement and design of façade details such as sills, transoms, cornices and sign bands); roof forms; exterior materials; exterior surface features and appurtenances; exterior colors; exterior signage; on-site landscaping; exterior lighting; parking and loading area design; and the use of screening. (b) Building Setback. Throughout the district, the setback of buildings from street yard and side yard property lines shall conform to the design theme described in Subsection (4) above, as determined by the Plan Commission. 1. No parking areas shall be located along any street frontage within the DMU district, unless an exception is granted through the conditional use process (Section 17.10.32). ASSESSMENT: MEETS CRITERIA OF ZONING BULK REQUIREMENTS. PARKING AT NORTH SIDE IS CONCEALED WITHIN BUILDING. Page 32 of 224 Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com LANGUS ON MAIN MOUNT HOREB – MAIN ST MIXED USE BLDG September 30, 2026 Page 15 (c) Building Height. 1. See Sections 17.04.11 to 17.04.14 for zoning district maximum height requirements. ASSESSMENT: MEETS CRITERIA (d) Building Mass. 1. Throughout the district, the massing of buildings may vary depending on location and surrounds, but shall conform to the design theme described in Subsection (4) above, as determined by the Plan Commission. 2. The characteristic proportion (relationship between façade height and width) of the design theme shall be maintained. 3. Building mass for large structures (with a façade area exceeding 5,000 square feet) shall integrate façade articulations to conform to the design theme described in Subsection (4), as determined by the Plan Commission. ASSESSMENT: MEETS CRITERIA (e) Façade Articulation. As determined by the Plan Commission, façade lengths shall not be greater than 40 feet without articulation such as: 1. Recesses or projections that step back or project a portion of the main façade plane. 2. Recesses or projections of upper floors from the ground floor façade plane. 3. Vertical division using different textures or materials. 4. Division of the façade into individual units through the use of windows, entrances, arcades, porches, decks, balconies, lighting, or the incorporation of traditional storefront design along the ground floor per Section 17.07.50(6)(e). 5. Roof form variation such as the inclusion of dormers, change in roof lines, or change in roof type. 6. Public art installations located directly on a facade, such as murals (See Chapter 12.075 of the Village of Mount Horeb Municipal Code for public art standards). ASSESSMENT: MEETS CRITERIA (f) Horizontal Rhythms. The horizontal pattern of exterior building elements formed by patterns of building openings for windows and doors, and related elements such as piers and columns shall be spaced at regular intervals across all visible façades of the building, and shall conform to the design theme described in Subsection (4) above, as determined by the Plan Commission. ASSESSMENT: MEETS CRITERIA (g) Vertical Rhythms. The floor heights shall conform to the minimum and maximum height requirements of the DMU zoning district (Section 17.04.12). The rhythm of the ground floor shall harmonize with the rhythm of upper floors. The vertical pattern of exterior building elements formed by patterns of building openings for windows and doors, and related elements such as sills, headers, transoms, cornices and sign bands shall conform to the design theme described in Subsection (4) above, as determined by the Plan Commission. Page 33 of 224 Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com LANGUS ON MAIN MOUNT HOREB – MAIN ST MIXED USE BLDG September 30, 2026 Page 16 ASSESSMENT: MEETS CRITERIA (h) Roof Forms. Flat or gently sloping roofs which are not visible from the street shall be used. Mansards or other exotic roof shapes not characteristic of the design theme described in Subsection (4) above, as determined by the Plan Commission, shall not be used. See Figure 17.07.50b. ASSESSMENT: MEETS CRITERIA (i) Exterior Materials. Selected building materials conform to the design theme described in Subsection (4) above, a determined by the Plan Commission. 1. Masonry. Stone or brick facing shall be of even coloration and consistent size. Cinder block, concrete block, concrete slab, or concrete panel shall not be permitted. 2. Siding. a. Wood, fiber cement, textured metal clapboard siding, or an alternative appropriate high-quality siding material may be appropriate, particularly if the proposed non-masonry exterior was used on a building which conforms to the design theme described in Subsection (4) above, as determined by the Plan Commission. b. Clapboard or board and batten may be appropriate in certain instances where used on the existing structure within the same block-face which conforms to the design theme described in Subsection (4) above, as determined by the Plan Commission. c. Class IV materials are prohibited. ASSESSMENT: MEETS CRITERIA 3. Glazing. Clear, or slightly tinted glass or related glazing material shall be used. Mirrored glass, smoked glass, or heavily tinted glass shall not be permitted, unless needed in a special situation as determined by the Plan Commission. ASSESSMENT: MEETS CRITERIA 4. Colors. Pain colors used on exterior materials shall reflect the building’s era of original construction, target era of restoration/renovation, and/or era of historical significance. Applicants may choose their paint color choice within one of these contexts. New construction paint colors should complement surrounding structures. a. Period-appropriate color palette examples include the Sherwin Williams historic exterior collections. ASSESSMENT: MEETS CRITERIA (j) Exterior Surface. Exterior surface appurtenances shall conform to the design theme described in Subsection (4) above, as determined by the Plan Commission. 1. The traditional storefront design theme (characterized by strong horizontal and vertical rhythms formed by building openings, windows, and transom windows) shall be employed for all new nonresidential buildings. Page 34 of 224 Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com LANGUS ON MAIN MOUNT HOREB – MAIN ST MIXED USE BLDG September 30, 2026 Page 17 2. Throughout the district, avoid cluttering building façades with brackets, wiring, meter boxes, antennae, gutters, downspouts and other appurtenances. Unnecessary signs shall also be avoided. Where necessary, such features shall be colored so as to blend in, rather than contrast, with the immediately adjacent building exterior. Extraneous ornamentation which is inconsistent with the design theme described in Subsection (4) above, as determined by the Plan Commission, is also prohibited. ASSESSMENT: MEETS CRITERIA (k) Awnings and Marquees. Awning and marquee size, color and placement shall complement the architectural character of the building, as determined by the Plan Commission. 1. Soft, weather-treated canvas or vinyl materials which allow for flexible or fixed installation shall be used for awnings. 2. Aluminum or suspended metal canopies shall be permitted. 3. Signage applied to awnings shall be simple and durable. 4. Backlit awnings are prohibited. ASSESSMENT: MEETS CRITERIA (l) Exterior Lighting. On-building exterior lighting shall be compatible and harmonious with the design theme described in Subsection (4) above and Section 17.06.20, as determined by the Plan Commission. 1. On-Building Lighting. The design, color, height, location, and light quality of all on-building light fixtures shall be consistent for all light fixtures. 2. Ground-Mounted Lighting. The design, color, height, location and light quality of ground-mounted lighting shall be consistent with the design theme described in Subsection (4) above, as determined by the Plan Commission. ASSESSMENT: MEETS CRITERIA (m) Signage. See Article IX for all signage requirements. ASSESSMENT: SIGNAGE TO BE SUBMITED AT A LATER DATE BY TENANTS (n) Cleaning. Structural components and exterior materials shall be cleaned when necessary, and with only the gentlest possible methods. 1. Low-pressure water, steam cleaning, and soft natural bristle brushes are permitted. 2. Sandblasting and power washing (more than 400 psi) are prohibited. 3. Other methods shall be pre-approved by the Plan Commission. (6) Design Standards for Design Alteration Review and Renovation Review (Changes to the Exterior Appearance of a Property). (OMMITTED, NOT APPLICABLE TO NEW BUILDING) Page 35 of 224 Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com LANGUS ON MAIN MOUNT HOREB – MAIN ST MIXED USE BLDG September 30, 2026 Page 18 ARTICLE VIII: LANDSCAPING REQUIREMENTS Section 17.08.01: Purpose The purpose of this Article is to establish landscaping requirements and other regulations intended to preserve and maintain vegetation within in a manner that promotes the natural resource protection, aesthetic, and public health goals of the Village. Section 17.08.10: Applicability (5) Exemptions. (b) All land uses in the Downtown Mixed-Use District, Parks and Recreation District, and Conservancy District are exempt from all landscaping requirements. ASSESSMENT: EXEMPT FROM LANDSCAPING REQUIREMENTS STORMWATER MANAGEMENT Redevelopment site, compliant with Village and County requirements. Page 36 of 224 Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com LANGUS ON MAIN MOUNT HOREB – MAIN ST MIXED USE BLDG September 30, 2026 Page 19 Parking The parking accommodations will include 54 total parking spaces on site. All of the stalls will be at grade, secure, indoor parking, accessed from Third Street and will now exit only to alleyway at the north in order to drive traffic to the stoplight. These will be reserved for residents and business tenants of the building. Parking Ratios: • 54 parking stalls, internal to the building • 1.28:1 ratio of stalls to units; 1.08:1 ratio of stalls to bedrooms • 49 bicycle parking stalls (38 wall, 11 floor) Refuse A refuse room internal to the building will be provided to conceal trash and recycling dumpsters. Access for removal will be provided at Third Street / the East end of the building. Amenity Space The tenants will have access to building amenities including: clubhouse, outdoor rooftop patio, fitness room, conference room. The total areas of which are compliant with Village Code. Outdoor Space There will be a tenant rooftop patio amenity and clubhouse on the third floor. Private outdoor balconies are provided for each dwelling unit. These balconies are either mounted tot eh exterior wall, or recessed - refer to the building plans and elevations. The first floor corner commercial space is intended to have outdoor seating, potentially for dining use. Page 37 of 224 Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com LANGUS ON MAIN MOUNT HOREB – MAIN ST MIXED USE BLDG September 30, 2026 Page 20 Exterior Design The goal of the development aesthetic is to compliment the historic Main Street appeal of Mount Horeb. The materials used will be a combination of quality masonry (brick and stone), storefront glazing and composite wood siding. Colors will be selected to complement the streetscape in neutral, timeless, tones. Exterior design features include: • Vertical articulation is provided at a maximum of forty-foot spacing as required by Village code • The building is stepped back in areas at the upper floors to reduce the visual scale. • Parking is concealed, in lieu of exposed surface parking • A combination of brick, stone, and wood is used to vary the elevation and provide the ‘infill’ appearance common to most historic villages • Landscape and decorative lighting will be used to enhance the aesthetic and experience. • Outdoor spaces have been provided to activate the Main Street presence and provide for tenant amenities • Detail elements common to Mount Horeb are being introduced, such as recessed balconies, large storefront windows, a combination of fabric and structured canopies, brick pilasters, and wood sign-bands. All of these are found in historical context within the Village of Mount Horeb. The building height is three stories, and 40-feet. Additionally, the topography of the site slopes nearly eight feet from south to north, creating a challenge for any building development. Measured from grade, the exterior walls are approximately 32’ tall on the north side, and typically a maximum of only 36 feet in height when measured along any grade at any side. The building third-floor is stepped back at the North side for the outdoor patio amenity. It is also stepped back at the West side to create spacing from the Mount Horeb Telephone Company. The building section in the attached drawings illustrates the relative height relationships to Main Street, the North alley, and refence points to the historic opera house building. It should be noted that this proposed development is now shorter in height relative to the opera house, and approximately the same height as the Village Hall. Multiple elevations and renderings of the intended design are provided & attached. Materials and colors are shown approximate and called out on the elevations. Page 38 of 224 Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com LANGUS ON MAIN MOUNT HOREB – MAIN ST MIXED USE BLDG September 30, 2026 Page 21 Stormwater Management The redevelopment consideration of this property will not trigger a stormwater management plan. Rainwater collected from hardscape and rooves will be directed to the Village stormwater infrastructure. There will be placement of rooftop stormwater retention trays to reduce runoff. Utility Infrastructure Assessment Initial discussions with Village staff and utility stakeholders have not produced any concern for the development. Adequate supply for all utilities appears to be available, and the future design submissions will accurately describe and design the necessary development infrastructure. Traffic A Traffic Impact Analysis (TIA) has been performed by Traffic Analysis and Design (TADI) of Cedarburg, WI. A draft of the TIA report, dated August 14, 2025, has been forward separately to Village Staff. This report indicates only a modest impact to the adjacent streets as caused by this development. Further, we have modified the indoor parking structure and interior traffic flow such that the 3rd street will be “entrance only” and the NW corner will be “exit only”. This will then send traffic directly to the 2nd street stoplight. It will be up to the village to determine if the alley should be one way or two way traffic. The developer is ok with either choice. We are suggesting that the third street parking that exists today adjacent the building, be modified such that it is for short term “Delivery parking” only. This will dedicate spots for retail commercial deliveries and prevent long term parking near the intersection. Gallina company additional studied the inflow/exit of two of their properties during the exact same peak times the traffic analysis was done – results have been communicated previously. • Hoff Mt Horeb, WI – 48 units • LeSilve Middleton, WI – 180 units Page 39 of 224 Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com LANGUS ON MAIN MOUNT HOREB – MAIN ST MIXED USE BLDG September 30, 2026 Page 22 Adherence to the Comprehensive Plan There are several objectives that the 2022 Comprehensive Plan (with amendments) seeks to achieve. The following are examples of how this development Foster New Housing Options: • Provide a variety of housing types, densities, arrangements and costs to accommodate the needs, desires and life cycles of existing and future residents. o This proposed development will bring over forty new units of apartments within Mount Horeb’s urban district. • Increase the amount, type, and availability of affordable and workforce housing options in the Village. o While these units will be considered ‘market rate’, they provide a housing option for those that may not wish to, or be able to, afford the single-family housing ownership. Grow the Local Economy: • Strengthen and diversify the non-residential tax base and employment opportunities to serve the day-to-day needs of residents. • By adding commercial space and residential housing alike on underperforming real estate, the downtown tax base will be improved, and there will be an improved means to attract and retain businesses that enhance Mount Horeb’s desired character and appearance. o This development will enhance the downtown character and business climate through new development of properties that have exceeded their lifespan. • Cultivate independent small businesses and entrepreneurship opportunities in the Village, especially in and around downtown. o This development provides both housing and leasable commercial space for small business and is vital to the livelihood of Main Street. Page 40 of 224 Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com LANGUS ON MAIN MOUNT HOREB – MAIN ST MIXED USE BLDG September 30, 2026 Page 23 An excerpt from the Comprehensive Plan (Chapter Six: Land Use, page 43) supports the exact type of development our team is proposing: Central Mixed Use This future land use category is intended for pedestrian-oriented commercial, office, community facility, and upper story residential uses in a “downtown” setting, with on- street parking and minimal building setbacks. The Central Mixed-Use land use category includes the historic downtown area. The existing Village zoning district that is most appropriate to implement this future land use category is the Central Business District (CB). • Policies and Programs: 1. Continue to implement the recommendations of the Downtown Redevelopment Plan. 2. Promote downtown as a tourist, commercial, civic, and social center. 3. Work with downtown property owners and businesses to preserve, renovate, modernize, and put to active use historically significant buildings. 4. Support the expansion, retention, and upgrading of specialty retail, restaurants, financial services, offices, neighborhood retail and services, and community uses. 5. Require that all projects submit and have approved detailed building elevations and site plans, showing the proposed locations of the building(s), parking, storage, loading, signage, landscaping, and lighting prior to development approval. 6. Protect the unique quality of downtown by requiring buildings to be at least two stories with a zero-lot line front setback. 7. Promote truly mixed-use development with residential above the first floor and design oriented to pedestrian and not automobiles. The Comprehensive Plan discusses a desire to create housing diversity for empty-nesters, young professionals, and new families, the project’s target demographic. This same plan seeks to “Foster Redevelopment, Reinvestment, and (promote) New Development”. “Environmental Sustainability and Stewardship” is also a stated goal of the Plan. By creating more density in this pedestrian friendly location, the impact to utility services, sprawling land use, environmental pollutants, and needless consumption of natural habitat is minimized. Simply put, this type of development, with this type of density, is smart. We believe this well-placed mixed use development not only reinforces the downtown Main Street corridor, it extends the useable area by nearly ¾ of a block, Lastly, it aids in reducing urban sprawl through a smart, dense, and walkable land use. Page 41 of 224 Sketchworks Architecture, LLC | 2501 Parmenter St., Suite 300A, Middleton, WI 53562 | 608.836.7570 | www.sketchworksarch.com LANGUS ON MAIN MOUNT HOREB – MAIN ST MIXED USE BLDG September 30, 2026 Page 24 Conclusion Community engagement on this project has been incredible, and the developer has gone great lengths to address and mitigate every concern brought forth. We firmly believe that this mixed-use infill development should be approved as it strengthens the heart of downtown and Main Street, and positions the community for long-term vitality. So many community’s downtowns die for lack of attention to their main street business districts: lack of business, lack of walkability (a condition of sprawl), and lack of residential density downtown. This project resolves all of these risks by bringing daily activity to the village center, supporting local businesses and creating a walkable, engaging environment – a huge economic and benefit, particularly when compared to the current land use (vacant lot, two old converted retail buildings). In addition to the enhanced and diversified tax base, this project ensures that Main Street remains vibrant and economically resilient for decades to come. It is an investment in Mount Horeb’s future character, livability, and sustained success! Our team has been working tirelessly to accommodate Village feedback while ensuring a viable project. We thank you for your consideration of this exciting development in Mount Horeb, we look forward to continued discussion and collaboration! Respectfully submitted Steve Shulfer, AIA Sketchworks Architecture, LLC Page 42 of 224 Page 43 of 224 Page 44 of 224 Page 45 of 224 Page 46 of 224 Page 47 of 224 Page 48 of 224 Page 49 of 224 P.O. Box 128 Cedarburg, WI 53012 800.605.3091 www.tadi-us.com Main Street Residential/Mixed-Use Development Traffic Impact Analysis Village of Mt Horeb Dane County, Wisconsin September 22, 2025 Page 50 of 224 TADI Phone: 800.605.3091 PO Box 128 www.tadi-us.com Cedarburg, WI 53012 PROVIDING TRAFFIC ENGINEERING SOLUTIONS TRAFFIC IMPACT ANALYSIS DATE: September 22, 2025 TO: Jeff Grundahl 214 E. Main LLC FROM: Don Lee, P.E. John A Bieberitz, P.E., PTOE Traffic Analysis & Design, Inc. SUBJECT: Main Street Residential/Mixed-Use Development 214-220 E. Main Street Village of Mt. Horeb, Dane County, WI INTRODUCTION A residential/mixed-use development is being proposed to be located on the north side of Main Street/State Trunk Highway (STH) 78 between North 2nd Street and North 3rd Street in the Village of Mt. Horeb, Dane County, Wisconsin (Exhibit 1). Access to the site is proposed via two full access driveway connections: one onto North 3rd Street and one onto the adjacent residential alley located immediately north of the proposed building (Exhibit 2A). This traffic impact analysis (TIA) report was prepared to address the weekday morning and weekday evening peak hour traffic impacts of the proposed development traffic on the adjacent transportation system. STUDY AREA Study Intersections The study area for this TIA includes the following existing and proposed intersections: • Main Street with North 2nd Street (traffic signal control) • Main Street with North 3rd Street (two-way stop control) • North 2nd Street with Alley (two-way stop control) • Alley with Proposed North Access Driveway (one-way stop control) • North 3rd Street with Proposed East Access Driveway (one-way stop control) Each intersection is shown on the study area map on Exhibit 1 and the site plan on Exhibit 2A. A transportation detail illustrating existing intersection lane configurations and speed limits is shown in Exhibit 3. Study Area Roadways Main Street is a two-lane undivided east/west principal arterial with a posted speed limit of 25 miles per hour (mph). According to WisDOT, the Year 2024 annual average daily traffic Page 51 of 224 Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin Page 2 of 11 September 22, 2025 volumes (AADTs) on Main Street were approximately 8,900 vehicles per day (vpd) immediately west of North 2nd Street, 10,000-vpd to the west of North 3rd Street and 9,100-vpd (2025 count) to the east of North 3rd Street. Sidewalks and parallel parking are currently provided along both sides of Main Street within the limits of the study area. 2nd Street is a two-lane undivided major collector with a posted speed limit of 25-mph. The Year 2022 WisDOT AADT volumes on 2nd Street were 1,300-vpd immediately south of Main Street. No WisDOT AADT is currently available to the north; however, ADT volumes of approximately 900-vpd were interpolated from six hours of peak period turning movement counts taken as part of this study. Sidewalks and parallel parking are currently provided along both sides of North 2nd Street, immediately north of Main Street. Sidewalks are also currently provided along both sides of South 2nd Street, immediately south of Main Street and angle parking is provided along only the west side of the street to the south of Main Street. 3rd Street is a two-lane undivided major collector with a posted speed limit of 25-mph. The Year 2022 WisDOT AADT volumes on 3rd Street were 400-vpd immediately south of Main Street. No WisDOT AADT is currently available to the north; however, ADT volumes of approximately 300-vpd were interpolated from six hours of peak period turning movement counts taken as part of this study. Sidewalks are currently provided along both sides of 3rd Street, immediately north of Main Street and parallel parking is provided along only the west side of the street to the north of Main Street. Sidewalks and parallel parking are also currently provided along only the west side of South 3rd Street, immediately south of Main Street. DATA COLLECTION Existing Traffic Counts Weekday morning (6:00 to 9:00 a.m.) and weekday evening (3:00 to 6:00 p.m.) turning movement traffic counts were conducted by TADI in early August of 2025 at the 2nd Street intersections with Main Street and the north alley and with the 3rd Street intersection with Main Street. Based on the turning movement traffic counts, the peak traffic hours at the study intersections were determined to occur from 7:15-8:15 a.m. (AM peak hour) and from 4:15-5:15 p.m. (PM peak hour). The traffic volume counts were compiled for these peak hours and are shown on Exhibit 4 as the “Existing Traffic Volumes”. The full traffic count data collected for this study, showing calculated peak hour factors and percentage of heavy trucks, is included in Appendix A. In addition, a Wavetronix radar counter was placed along the north alley between North 2nd Street and North 3rd Street to record the existing hourly and daily volumes along the alley. The count was conducted in early August of 2025. The counters recorded data from midday on Tuesday, August 5th through midday on Thursday, August 7th. The output for the counter has also been included in Appendix A. Based on the count, the ADT along the Alley between 2nd Street and 3rd Street is approximately 70 vehicles per day. PROPOSED DEVELOPMENT Site Description The proposed residential/mixed-use development is expected to include 65 apartment units made up of studio, one-bedroom and two-bedroom units on floors two through four (Exhibit 2B) and a Page 52 of 224 Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin Page 3 of 11 September 22, 2025 parking garage (68 stalls) and a commercial space provided on the first floor. Access to the site is proposed via two full access driveway connections: one onto North 3rd Street and one onto the adjacent residential alley located immediately north of the proposed building (Exhibit 2A). The residential/mixed-use development is planned to be constructed and operational next year and is therefore included in the Full Build (with development) traffic volumes. Trip Generation To address any potential future traffic impacts at the study area intersections, it is necessary to identify the hourly volume of traffic generated by anticipated development. Traffic volumes expected to be generated are based on the size and type of the proposed uses and on trip rates and fitted curve equations as published in the Institute of Transportation Engineers’ (ITE) Trip Generation Manual, 11th Edition. Even though the building is expected to be four floors (one commercial plus three residential), the ITE land use code (LU230) “Low-Rise Residential with Ground-Floor Commercial, 2-3 floors (1-25K)” was utilized for this study in lieu of LU231 “Mid-Rise Residential with Ground-Floor Commercial, 4-10 floors (1-25K)” as a worst case (highest volume) traffic condition. A comparison table is provided in Appendix B. Due to the nature of the land use type, the proposed development is not expected to include linked trips or pass-by trips. Linked trips occur when a motorist visits one or more tenants or land use within a development site. Pass-by trips occur when motorists already on the roadway system stop at the site prior to continuing on their intended route. Internal linked trips between the residential and commercial land uses are already included in the ITE rates used. The trip generation table developed for the proposed residential/mixed-use development is shown on Exhibit 5A. As shown, the proposed development is expected to generate about 220 total trips (110 in/110 out) over a typical weekday, with 30 new trips (5 in/25 out) expected during the weekday AM peak hour and 25 trips (20 in/5 out) expected during the weekday PM peak hour. Pedestrians and bicyclists may use their respective modes to access the proposed residential/mixed-use development ; however, to allow for a conservative (highest vehicular volume) analysis, these modes were assumed to make up a relatively small portion of the overall trips to/from the study area. For the purpose of this TIA, all trips to/from the proposed development site were assumed to occur via motor vehicle. Trip Distribution The trip distribution for the proposed development, listed below and shown in table format in Exhibit 5A and graphically in Exhibit 5B, was determined based on the existing traffic count patterns, the type of proposed land uses and the location of existing populations within the immediate study area. • 48% to/from the east on Main Street • 43% to/from the west on Main Street • 2% to/from the north on 2nd Street • 7% to/from the south on 2nd Street Page 53 of 224 Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin Page 4 of 11 September 22, 2025 Traffic Assignment Per direction from the Village of Mt. Horeb, two access scenarios were evaluated as part of this study. The two access scenarios are as follows: • Scenario 1 – Access to the site is proposed via two full access driveways with the alley operating under two-way operation. • Scenario 2 - Access to the site is proposed via two full access driveways with the alley operating under one-way westbound operation. The proposed development new trips for the two respective access scenarios were assigned to the study intersections based on the above trip distributions. The traffic assignment for the two respective access scenarios is shown on Exhibits 6A&B. The new trips under Scenario 1 (Exhibit 6A) were added to the Existing traffic volumes (Exhibit 4) to generate the “Full Build (Scenario 1)” traffic volumes. The “Full Build (Scenario 1)” traffic volumes are shown on Exhibit 7A. The new trips under Scenario 2 (Exhibit 6B) were added to the Existing traffic volumes (Exhibit 4) to generate the “Full Build (Scenario 2)” traffic volumes. The “Full Build (Scenario 2)” traffic volumes are shown on Exhibit 7B. PEAK HOUR TRAFFIC OPERATIONS & QUEUES The study intersections were analyzed using the Synchro 12 traffic analysis model (outputs based on the Highway Capacity Manual, 7th Edition) and the peak hour turning movement volumes estimated for the study area intersections. Intersection operation is defined by “level of service.” Level of Service (LOS) is a quantitative measure that refers to the overall quality of flow at an intersection ranging from very good, represented by LOS ‘A,’ to very poor, represented by LOS ‘F.’ For the purposes of this study, LOS D or better was used to define acceptable peak hour operating conditions. The LOS descriptions for signalized and unsignalized intersections are in Table 1. Page 54 of 224 Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin Page 5 of 11 September 22, 2025 Table 1. LOS Descriptions The capacity analysis tables in the following sections show the peak hour LOS, delays (in seconds per vehicle), and queues (in feet) for the Existing traffic condition and for both of the access scenarios under the Full Build traffic condition. The Synchro capacity analysis worksheets for all analysis scenarios are located in Appendix D. Existing Traffic Operations Table 2 shows the results of the weekday morning and weekday evening peak hour operational analysis at the existing study area intersections. The existing study intersections were evaluated using the existing geometrics and traffic control as shown on Exhibit 3, and the Existing traffic volumes shown in Exhibit 4. Signalized Intersections Unsignalized Intersections Control Delay/Vehicle Avg. Control Delay Relative LOS (sec/veh) (sec/veh) Delay ≤10 ≤10 > 10 - 20 > 10 - 15 > 20 - 35 > 15 - 25 > 35 - 55 > 25 - 35 > 55 - 80 > 35 - 50 > 80 > 50 Source: Highway Capacity Manual, Transportation Research Board, Washington, D.C., 2010 F Long DelaysExtremely low speeds. Intersection congestion. Long delays. Extensive traffic queues at intersections. A Short Delays Free-flow traffic operations at avearge travel speeds. Vehicles completely unimpeded in ability to maneuver. Minimal delay at signalized intersections B Reasonably unimpeded traffic operations at average travel speeds. Vehicle maneuverability slightly restricted. Low traffic delays. C Stable traffic operations. Lane changes becoming more restricted. Travel speeds reduced to half of average free flow travel speeds. Longer D Moderate Delays Small increases in traffic flow can cause increased delays. Delays likely attributable to increased traffic, reduced signal progression, and adverse E Significant delays. Travel speeds reduced to one-third of average free flow travel speed. Page 55 of 224 Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin Page 6 of 11 September 22, 2025 Table 2. Existing Traffic Peak Hour Operations As shown in Table 2, all turning movements at the existing study area intersections are currently operating acceptably at LOS D or better during the weekday morning and weekday evening peak hours under the Existing traffic volume conditions. Full Build Traffic Operations The proposed site access driveways were evaluated with stop control on the development site approaches. Tables 3 and 4 show the results of the weekday morning and weekday evening peak hour operational analysis at the study area intersections with the proposed development fully built out under the two respective access scenarios. The study intersections were evaluated using the Full Build traffic volumes under the two respective access scenarios as shown in Exhibits 7A&B. I/S LOS & ↗ → ↘ ↙ ← ↖ ↖ ↑ ↗ ↘ ↓ ↙ Delay LOS Delay Queue LOS Delay Queue LOS A Delay 8.9 Queue LOS A Delay 8.3 Queue LOS Delay Queue LOS Delay Queue (-) indicates a movement that is prohibited or does not exist; (*) indicates a freeflow movement. Delay is reported in seconds. Queue is the maximum of the 50th & 95th percentile queue, measured in feet. 25' 25' 25' 25' PM A A B D 9.2 8.5 12.4 29.1 Two-Way Stop Control 7.9 8.9 13.2 18.6 Node 300: 3rd Street & Main Street 25' 25' 25' 25' AM A A B C Lanes-> 1 1 1 1 125' 285' 85' 65' PM A A D D 3.3 5.3 36.8 35.8 Traffic Signal Control 3.8 3.1 36.7 34.9 Node 200: 2nd Street & Main Street 150' 85' 90' 55' AM A A D C Lanes-> 1 1 1 1 25' 25' 25' 25' PM A A A A 8.9 9.2 7.3 7.3 Two-Way Stop Control 8.9 9.2 7.3 7.3 25' 25' 25' 25' AM A A A A Southbound Node 100: 2nd Street & Alley Lanes-> 1 1 1 1 Intersection Peak Hour Metric Level of Service (LOS) per Movement by Approach Eastbound Westbound Northbound Page 56 of 224 Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin Page 7 of 11 September 22, 2025 Table 3. Full Build (Scenario 1 – Alley Two-Way Traffic) Traffic Peak Hour Operations I/S LOS & ↗ → ↘ ↙ ← ↖ ↖ ↑ ↗ ↘ ↓ ↙ Delay LOS Delay Queue LOS Delay Queue LOS A Delay 9.2 Queue LOS A Delay 8.3 Queue LOS Delay Queue LOS Delay Two-Way Stop Control v/c Queue - - LOS - - Delay - - Queue - - LOS - - Delay - - Queue - - - - LOS - - Delay - - Queue - - LOS - - Delay - - Queue - - (-) indicates a movement that is prohibited or does not exist; (*) indicates a freeflow movement. Delay is reported in seconds. Queue is the maximum of the 50th & 95th percentile queue, measured in feet. 25' - 25' * PM A - A * 8.5 - 7.3 * One-Way Stop Control 8.5 - 7.3 * Node 500: East Driveway & 3rd Street 25' - 25' * AM A - A * Lanes-> 1 - 1 1 * 25' 25' - PM * A A - * 7.2 8.5 - One-Way Stop Control * 7.2 8.7 - Node 400: North Driveway & Alley * 25' 25' - AM * A A - Lanes-> 1 1 1 - - - 0.14 25' 25' 25' 25' PM A A B E 9.3 8.5 12.4 36.6 - Two-Way Stop Control 8.0 8.9 13.2 19.4 Node 300: 3rd Street & Main Street 25' 25' 25' 25' AM A A B C Lanes-> 1 1 1 1 130' 285' 85' 65' PM A A D D 3.4 5.3 36.8 35.8 Traffic Signal Control 3.8 3.1 36.6 35.2 Node 200: 2nd Street & Main Street 150' 90' 90' 65' AM A A D D Lanes-> 1 1 1 1 25' 25' 25' 25' PM A A A A 8.9 9.2 7.3 7.3 Two-Way Stop Control 8.9 9.3 7.3 7.2 25' 25' 25' 25' AM A A A A Southbound Node 100: 2nd Street & Alley Lanes-> 1 1 1 1 Intersection Peak Hour Metric Level of Service (LOS) per Movement by Approach Eastbound Westbound Northbound Page 57 of 224 Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin Page 8 of 11 September 22, 2025 Table 4. Full Build (Scenario 2 - Alley One-Way Westbound Traffic) Traffic Peak Hour Operations As shown in Tables 3 and 4, with the additional traffic from the proposed development, regardless of the access scenario, all turning movements at the study intersections are expected to continue to operate acceptably at LOS D or better during the weekday morning and weekday evening peak hours except the southbound movements at the Main Street intersection with 3rd Street which are expected to operate at slightly higher delays under the full build traffic volume conditions under either access scenario. Delays for the southbound movements are expected to be about 2 to 3 seconds over the LOS D industry standard of 35 seconds during the weekday evening peak hour. The southbound movements are expected to be 1.6 seconds over the LOS D threshold under access Scenario 1 and 2.5 seconds over the LOS D threshold under access Scenario 2. It is noted that, regardless of the access scenario, the volume to capacity ratio (v/c) for this southbound movement during the weekday evening peak hour is I/S LOS & ↗ → ↘ ↙ ← ↖ ↖ ↑ ↗ ↘ ↓ ↙ Delay LOS Delay Queue LOS Delay Queue LOS A Delay 9.2 Queue LOS A Delay 8.3 Queue LOS Delay Queue LOS Delay Two-Way Stop Control v/c Queue - - LOS - - Delay - - Queue - - LOS - - Delay - - Queue - - - - LOS - - Delay - - Queue - - LOS - - Delay - - Queue - - (-) indicates a movement that is prohibited or does not exist; (*) indicates a freeflow movement. Delay is reported in seconds. Queue is the maximum of the 50th & 95th percentile queue, measured in feet. 25' - 25' * PM A - A * 8.5 - 7.3 * One-Way Stop Control 8.5 - 7.3 * Node 500: East Driveway & 3rd Street 25' - 25' * AM A - A * Lanes-> 1 - 1 1 * 25' 25' - PM * A A - * 7.2 8.6 - One-Way Stop Control * 7.2 8.7 - Node 400: North Driveway & Alley * 25' 25' - AM * A A - Lanes-> 1 1 1 - - - 0.14 25' 25' 25' 25' PM A A B E 9.3 8.5 12.5 37.5 - Two-Way Stop Control 8.0 8.9 13.2 19.4 Node 300: 3rd Street & Main Street 25' 25' 25' 25' AM A A B C Lanes-> 1 1 1 1 130' 280' 85' 65' PM A A D D 3.4 5.2 36.8 35.8 Traffic Signal Control 3.8 3.1 36.6 35.2 Node 200: 2nd Street & Main Street 150' 85' 90' 65' AM A A D D Lanes-> 1 1 1 1 25' 25' 25' * PM A A A * 8.9 9.2 7.3 * Two-Way Stop Control 8.8 9.2 7.3 * 25' 25' 25' * AM A A A * Southbound Node 100: 2nd Street & Alley Lanes-> 1 1 1 1 Intersection Peak Hour Metric Level of Service (LOS) per Movement by Approach Eastbound Westbound Northbound Page 58 of 224 Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin Page 9 of 11 September 22, 2025 only 0.14 (or less than 1/7th intersection capacity). See gap study discussion in the next section of this report. In addition, queues for any movement at the study area intersections are expected to increase by 1 vehicle or less regardless of the access scenario and, with the exception of the aforementioned southbound movements at the Main Street intersection with 3rd Street, delays for any specific movement at the study area intersections are expected to increase by 1 second or less. Therefore, to provide for full access at all intersections during all hours of the day, providing two-way operation along the north alley, as shown under access Scenario 1, is recommended. GAP STUDY ANALYSIS Because the model showed slightly higher delays for the southbound movements at the Main Street intersection with 3rd Street, a gap analysis was completed at this intersection during the typical weekday morning and weekday afternoon peak hours to document the existing gaps in the east/west traffic stream and to estimate the potential availability of gaps under the full build traffic conditions. During the weekday AM and PM peak hours, the length of gaps, in time, between vehicles traveling along Main Street (at 3rd Street) were counted. Critical gap and follow-up times for vehicle turning movements were calculated based on the Highway Capacity Manual (HCM) equations 17-1 and 17-2. These equations include adjustment factors for heavy vehicles, grade, divided roadways, and intersection geometry. The gap analysis worksheet calculations and compiled gap counts are located in Appendix C. Equivalent gaps (or capacity of gaps) are calculated by adding the number of gaps available for only one vehicle to turn, gaps long enough for two vehicles to turn, and gaps long enough for three vehicles to turn (without counting the same gaps twice). The equivalent gaps represent the number of additional turning movements that could be made beyond the existing turning movements already occurring. Table 5 summarizes the findings of the gap study for the Main Street intersection with 3rd Street during the typical weekday peak hours. The table shows the equivalent gaps calculated from the field counts, the net new site trips assigned to the turning movements at the intersection, and the excess gaps available for additional turning movements above those numbers. Table 5. Traffic Gap Study: Main Street Intersection with 3rd Street Intersection Direction Peak Hour Equivalent Gaps Net New Site Trips Excess Gaps Main Street & 3rd Street AM 243 5 238 PM 140 0 140 AM 105 10 95 PM 51 5 46 AM 321 0 321 PM 235 10 225EB Left Turn from Main Street SB Right Turn from 3rd Street SB Left Turn from 3rd Street Page 59 of 224 Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin Page 10 of 11 September 22, 2025 As shown in Table 5, there are anywhere from 46 to 320 excess gaps along Main Street during the AM or PM peak periods for additional turning movements beyond the existing traffic and site new trip traffic assigned to the Main Street intersection with 3rd Street. These excess gaps confirm the analysis output showing acceptable delays and queues at this intersection with the Full Build traffic volumes. It is noted that the Main Street signalized intersection at 2nd Street assists in the creation of these gaps in the Main Street traffic stream. RECOMMENDATION MODIFICATONS Recommended modifications are expected to be necessary at the study area intersections to allow for acceptable and safe operations under the Full Build traffic volume conditions, as shown in Exhibit 8 and detailed below. Modifications are for jurisdictional consideration and are not legally binding. The Village of Mt. Horeb reserves the right to determine alternative solutions. Node 100: 2nd Street with Alley • Existing Traffic: No modifications • Full Build Traffic: No modifications Node 200: 2nd Street with Main Street • Existing Traffic: No modifications • Full Build Traffic: No modifications Node 300: 3rd Street with Main Street • Existing Traffic: No modifications • Full Build Traffic: No modifications Node 400: Proposed North Driveway with Alley • Existing Traffic: Not applicable • Full Build Traffic: o Provide a full access driveway connection onto the alley as shown on the conceptual site plan. o Provide stop sign control on the south approach. Node 500: Proposed East Driveway with 3rd Street • Existing Traffic: Not applicable • Full Build Traffic: o Provide a full access driveway connection onto 3rd Street as shown on the conceptual site plan. o Provide stop sign control on the west approach. Slightly higher delays which are expected at the Main Street intersection with 3rd Street during the typical weekday evening peak hour under the full build traffic volume conditions. However, since the delays are only slightly (about 2-3 second) over the LOS D threshold and queue lengths for exiting southbound vehicles are expected to be reasonable (about 1 vehicle), and with Page 60 of 224 Main Street Residential/Mixed-Use Development – Mt. Horeb, Wisconsin Page 11 of 11 September 22, 2025 reasonable capacity ratios and traffic signals located immediately to the west that creates gaps in the mainline east/west traffic stream, the intersection is expected to operate safely under full build conditions. In addition, if angle parking is desired along the alley north of the proposed development, operations along the alley corridor are not expected to be adversely impacted since very low volumes (approximately 70 vehicles per day) were recorded along this corridor on a typical weekday. Angle parking could be implemented, and safe operations would be expected, if designed per typical industry standards. CONCLUSION Based on the projected traffic volumes and with the recommended modifications as shown on Exhibit 8, the proposed access driveways are expected to operate acceptably under full build conditions with the aforementioned modifications recommended in this study. All movements at the study area intersections are expected to operate safely and efficiently with the planned geometric and traffic control conditions depicted in this TIA through the opening year and with full buildout and full occupancy of the proposed development. Appendices Appendix A – Traffic Counts Appendix B – Trip Generation Comparison Appendix C – Gap Analysis Appendix D – Existing & Full Build Traffic Synchro Analysis Page 61 of 224 3516: 9-22-25 N NOT TO SCALE EXHIBIT 1 PROJECT OVERVIEW MAP MT HOREB, WISCONSIN Study Area Intersection On-Site Development LEGEND Page 62 of 224 3516: 9-22-25 N NOT TO SCALE EXHIBIT 2A CONCEPTUAL SITE PLAN COMMERCIAL/PARKING (FIRST FLOOR) MT HOREB, WISCONSIN Page 63 of 224 3516: 9-22-25 N NOT TO SCALE EXHIBIT 2B CONCEPTUAL SITE PLAN APARTMENTS (2ND THROUGH 4TH FLOORS) MT HOREB, WISCONSIN Page 64 of 224 3516: 9-22-25 N NOT TO SCALE EXHIBIT 3 EXISTING TRANSPORTATION DETAIL MT HOREB, WISCONSIN Traffic Signal Control Stop Sign Control Existing Lane Configuration Distance Between Roadways (in Feet) LEGEND 3rd Street SPEED LIMIT 25 Main Street 2nd Street 3rd Street Alley SPEED LIMIT 25 SPEED LIMIT 25 SPEED LIMIT 25 XX’ 40’ 165’ 415’ Page 65 of 224 3516: 9-22-25 N NOT TO SCALE EXHIBIT 4 YEAR 2025 EXISTING TRAFFIC VOLUMES MT HOREB, WISCONSIN (10) 10 (15) 15 (5) 5 5 (15) (5) 10 AM Peak Hour (7:15 - 8:15 AM) PM Peak Hour (4:15 - 5:15 PM) Negligible Traffic Volumes (Fewer than 3 vph) 2025 Annual Average Daily Traffic (AADT) LEGEND XX (XX) - X,XXX - ( - ) 30 (30) - ( - ) North Driveway East Driveway 8,900 Alley 3rd Street 2nd Street Main Street 10,000 X,XXX 2024 Annual Average Daily Traffic ( )AADT 2022 Annual Average Daily Traffic (AADT) 1,300 400 (20) 15 10 (15) 270 (640) 35 (10) (5) 5 (455) 485 ( - ) 15 15 (10) (30) 20 (5) 5 (45) 65 15 (20) 230 (575) 30 (50) (5) 10 (380) 400 (10) 20 10 (20) - (5) 40 (35) 3rd Street 9,100 (5) - ( - ) 5 (15) 15 - ( - ) - ( - ) 5 (15) 5 (5) 10 (5) ( - ) - (70) 10 X,XXX Page 66 of 224 3516: 9-22-25 N NOT TO SCALE EXHIBIT 5A ON-SITE TRIP GENERATION & DISTRIBUTION TABLES MT HOREB, WISCONSIN In Out Total In Out Total 220 5 25 30 20 5 25 (3.44) (23%) (77%) (0.44) (71%) (29%) (0.36) 220 5 25 30 20 5 25 TRIP DISTRIBUTION (New Trips) East on Main Street 48% 110 5 10 10 5 West on Main Street 43% 90 0 10 10 0 North on 2nd Street 2% 0 0 0 0 0 South on 2nd Street 7% 20 0 5 0 0 100% 220 5 25 20 5 Exhibit 5A On-Site Trip Generation Table1 1ITE Trip Rates (X.XX) and/or Fitted Curve Equations (FCE) are from the ITE Trip Generation Manual, 11th Edition. Total New Trips PM Peak Low-Rise Residential with Ground-Floor Commercial (2-3 Floors) (1-25k) 230 65 Units Land Use ITE Code Proposed Size Weekday Daily AM Peak Page 67 of 224 3516: 9-22-25 N NOT TO SCALE EXHIBIT 5B TRIP DISTRIBUTION DIAGRAM MT HOREB, WISCONSIN 43% 7% 2% North Driveway East Driveway Alley 3rd Street 2nd Street Main Street Proposed Trip Distribution LEGEND XX% 48% Page 68 of 224 3516: 9-22-25 N NOT TO SCALE EXHIBIT 6A ON-SITE NEW TRIPS ALLEY - TWO WAY TRAFFIC MT HOREB, WISCONSIN ( - ) 10 10 ( - ) (15) 5 North Driveway East Driveway (5) 15 Alley 3rd Street 2nd Street Main Street 5 (10) (5) - 5 ( - ) 10 (5) 5 ( - ) (5) - (5) - 5 ( - ) 5 ( - ) 3rd Street (5) - (5) - Peak Hour (7:15 - 8: )AM 15 AM Peak Hour (4:15 - 5:15 PM)PM Negligible Traffic Volumes (Fewer than 3 vph) LEGEND XX (XX) - Page 69 of 224 3516: 9-22-25 N NOT TO SCALE EXHIBIT 6B ON-SITE NEW TRIPS ALLEY - ONE WAY (WESTBOUND) TRAFFIC MT HOREB, WISCONSIN ( - ) 10 10 ( - ) (20) 5 North Driveway East Driveway (5) 15 Alley 3rd Street 2nd Street Main Street 5 (10) (10) - 5 ( - ) 10 (5) 5 ( - ) (10) - 5 ( - ) 5 ( - ) Peak Hour (7:15 - 8: )AM 15 AM Peak Hour (4:15 - 5:15 PM)PM Negligible Traffic Volumes (Fewer than 3 vph) LEGEND XX (XX) - 3rd Street Page 70 of 224 3516: 9-22-25 N NOT TO SCALE EXHIBIT 6C REDISTRIBUTED TRIPS ALLEY - ONE WAY (WESTBOUND) TRAFFIC MT HOREB, WISCONSIN (5) 5 North Driveway East Driveway Alley 3rd Street 2nd Street Main Street 5 (5) -5 (-5) (-5) -10 -5 (-5) ( - ) 5 ( - ) -5 5 (5) Peak Hour (7:15 - 8: )AM 15 AM Peak Hour (4:15 - 5:15 PM)PM Negligible Traffic Volumes (Fewer than 3 vph) LEGEND XX (XX) - 3rd Street (5) 5 (-5) -5 Page 71 of 224 3516: 9-22-25 N NOT TO SCALE ( - ) 10 ( - ) - (15) 5 (20) 15 North Driveway East Driveway ( - ) - (5) 15 Alley 3rd Street 2nd Street Main Street 15 (25) 270 (640) 35 (10) (10) 5 (455) 485 ( - ) 15 10 (5) 20 (10) 15 (20) 235 (575) 30 (50) (10) 10 (385) 400 (10) 20 15 (20) 5 (5) 40 (35) 3rd Street Peak Hour (7:15 - 8: )AM 15 AM Peak Hour (4:15 - 5:15 PM)PM Negligible Traffic Volumes (Fewer than 3 vph) LEGEND XX (XX) - (10) 10 (15) 15 (10) 5 - ( - ) - ( - ) 15 (15) (5) - ( - ) 5 (15) 15 - ( - ) 30 (30) - ( - ) ( - ) - (70) 10 (30) 20 (5) 5 (45) 65 EXHIBIT 7A FULL BUILD TRAFFIC VOLUMES ALLEY - TWO WAY TRAFFIC MT HOREB, WISCONSIN - ( - ) 15 (10) (5) 10 (5) - 5 (15) - ( - ) Page 72 of 224 3516: 9-22-25 N NOT TO SCALE EXHIBIT 7B FULL BUILD TRAFFIC VOLUMES ALLEY - ONE WAY (WESTBOUND) TRAFFIC MT HOREB, WISCONSIN ( - ) 10 North Driveway East Driveway Alley 3rd Street 2nd Street Main Street 20 (30) 265 (635) 35 (10) (15) 5 (455) 485 ( - ) 15 10 (5) 20 (10) 10 (15) 235 (575) 35 (50) (5) 10 (390) 400 (10) 20 15 (20) 5 (5) 40 (35) 3rd Street Peak Hour (7:15 - 8: )AM 15 AM Peak Hour (4:15 - 5:15 PM)PM Negligible Traffic Volumes (Fewer than 3 vph) LEGEND XX (XX) - (10) 10 (15) 15 ( - ) - - ( - ) - ( - ) 15 (15) (5) 5 ( - ) - (15) 15 - ( - ) 20 (30) - ( - ) ( - ) - (70) 10 (30) 20 (5) 5 (45) 65 10 (20) - ( - ) ( - ) - (5) 15 - ( - ) 15 (10) (20) 5 (25) 20 Page 73 of 224 3516: 9-22-25 N NOT TO SCALE EXHIBIT 8 RECOMMENDED MODIFICATIONS MT HOREB, WISCONSIN North Driveway East Driveway Alley 3rd Street 2nd Street Main Street LEGEND XX’ Traffic Signal Control Stop Control Storage Length (In Feet) Existing Lane Configuration Proposed Modifications BLUE Provide driveways as shown on site plan Page 74 of 224 3516: 9-22-25 N NOT TO SCALE APPENDIX B TRIP GENERATION COMPARISON TABLE MT HOREB, WISCONSIN In Out Total In Out Total 220 5 25 30 20 5 25 (3.44) (23%) (77%) (0.44) (71%) (29%) (0.36) Not 5 10 15 5 5 10 Available (23%) (77%) (0.22) (71%) (29%) (0.17) 0 15 15 15 0 15 Appendix Trip Generation Comparison Table1 Land Use ITE Code Proposed Size Weekday Daily AM Peak PM Peak Low-Rise Residential with Ground-Floor Commercial (2-3 Floors) (1-25k) 230 65 Units Mid-Rise Residential with Ground-Floor Commercial (4-10 Floors) (1-25k) 231 65 Units Difference 1ITE Trip Rates (X.XX) and/or Fitted Curve Equations (FCE) are from the ITE Trip Generation Manual, 11th Edition. Page 75 of 224 Main Street Residential/Mixed-Use Development – Mt Horeb, Wisconsin Appendix A Traffic Counts Turning Movement Counts Wavetronix Daily Count Page 76 of 224 Version 2025.03 Page 1 of 13 Base Information, Observed (6) Hour and Estimated (24) Hour Volume Summaries Major St: 2nd Street Minor St: Alley 2nd Street & Alley Site Information Count Information SW-M ↑ AM MD PM AM MD PM 0.877 2.359 Company Name 1.000 Comments Observed 6 Hour Volume Summary 6 PED: 15 BIKE: 2 7 145 2 0     PED:  1 PED: 38  61 3  33  0 ↑ 0  North 7  BIKE: 6  BIKE: 18 6  2    11 47 67 12 PED: 5 BIKE: 3 Estimated 24 Hour AADT 14 300 4 0      2  12  68  0 ↑ 0  North 14  12  178     Daily/Seasonal Factor 0.877 23 97 139 25 Count Expansion Factor 2.359 Manual Adjustment Factor 1.000 Total 24 Hr Expansion Factor 2.070 7:15-8:15am North Leg 2nd Street Clear and Dry Clear and Dry AM Peak Period Weather Wednesday, August 6, 2025 Wednesday, August 6, 2025 Midday Peak Period PM Peak Period Tuesday, August 5, 2025 Peak Hours Selected for Analysis Calculated Peak Hours Clear and Dry West Leg Alley South Leg 2nd Street 7:00-8:00am Traffic Control Partial Stop Control AM Peak Period Midday Peak Period PM Peak Period Miovision Miovision Observers Special Pedestrians Observed None None Manual Adj. Elementry school age children Pre-school children TADI Mioribion 60 Other (describe) None None TOTAL ENTERING VOLUME None Wis DOT Daily & Seasonal Factors are final for 2012 through 2024, and 2025 uses 2024 final factors. None NoneWheelchairs/electric scooters Elderly/disabled (except wheelchairs) Visually impaired (white cane/helper dog) 20 75  40 Alley 275 137 412 319 2nd Street  569 284 853 155  83 124  Roadway Names North Direction 4:15-5:15pm 4:00-5:00pm 124 Alley  41 890 TOTAL ENTERING VOLUME  430 154 60 Alley 329 2nd Street ESTIMATED 2nd Street Total Entering Hourly Volume Alley 159 99  Count Basics Schools Not in Session 1st Day of Count Tuesday, August 5, 2025 No Special Events Tuesday, August 5, 2025 Total Number of Hours Counted: 6 Start Date: County Intersection of: WisDOT Region13 - Dane Weekday Non-Holiday Municipality Village of Mt Horeb Hrs Counted: 06:00 AM-09:00 AM and 03:00 PM-06:00 PM Intersection Traffic Volume Report Special Considerations East Leg Alley Holidays None Special Events None (1) Non-Interstate Low Truck %Count Expansion Group Daily/Seasonal Adjustment Factor Schools Not in Session Count Expansion Factor (1) Non-Interstate Low Truck %Daily/Seasonal Adjustment Group 24 HOUR AADT 474 HOUR VOLUMES 229 OBSERVED 2nd Street 205  24 83 50 000000 77 102 94 0 0 1,000 6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM Motor Vehicle Volume One-Hour Time Period Start Time (Ex: 6am represents volume from 6am to 7am) Page 77 of 224 Page 2 of 13 Peak Hour Volume Graphical Summary 2nd Street & Alley AM Peak Hour Summary PED: 4 BIKE: 0 1 30 0 0 Manual Adj. 1.000   PED:  0 PED: 3  02  2  0 ↑ 0  North 0  BIKE: 3  BIKE: 11 7  0    11 01 3 4 PED: 0 BIKE: 0 Midday (MD) Peak Hour Summary PED: 0 BIKE: 0 0 0 0 0 Manual Adj. 1.000   PED:  0 PED: 0  00  0  0 ↑ 0  North 0  BIKE: 0  BIKE: 00  0    00 0 0 PED: 0 BIKE: 0 PM Peak Hour Summary PED: 4 BIKE: 0 1 25 0 0 Manual Adj. 1.000   PED:  0 PED: 14  02  13  0 ↑ 0  North 3  BIKE: 0  BIKE: 01 7  2    3 9 15 3 PED: 2 BIKE: 1 Count Basics Start Date: Tuesday, August 5, 2025 Total Number of Hours Counted: 6 2nd Street  58 30 88 0 0 0 0 16 20  3 Weekday Non-Holiday All Motor Vehicles 13 Alley 26 18  TOTAL ENTERING VOLUME 89 2nd Street  0 Alley 0  0  7 TOTAL ENTERING VOLUME Alley 10  PM PEAK HOUR 2nd Street 4:15-5:15pm 44 30 Alley 0   0 0 0 0 0 MD PEAK HOUR 78 2nd Street 2nd Street  50 28 Intersection Traffic Volume Report Wednesday, August 6, 2025 N/A Tuesday, August 5, 2025 Schools Not in Session No Special Events AM PEAK HOUR 2nd Street TOTAL ENTERING VOLUME 7:15-8:15am 44 81 31 13  11  Alley 2 Alley 31 9 20 Page 78 of 224 Count Basics Page 3 of 13 Peak Hour Volume Summary 2nd Street & Alley Peak Hour Volumes, Truck Percentages, and PHFs  AM Peak Hour 2nd Street Alley 2nd Street Alley Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals 7:15 AM 0 13 0 0 13 0 0 0 0 0 2 4 1 1 8 2 1 0 0 3 24 7:30 AM 1 5 0 0 6 0 0 0 0 0 1 5 2 0 8 3 1 0 0 4 18 7:45 AM 0 5 0 0 5 0 0 2 0 2 1 3 6 0 10 9 0 0 0 9 26 8:00 AM 0 7 0 0 7 0 0 0 0 0 0 1 1 0 2 3 1 0 0 4 13 Peak Hour Volume 1 30 0 0 31 0 0 2 0 2 4 13 10 1 28 17 3 0 0 20 81 Rounded Hourly Volume 0 30 0 0 30 0 0 0 0 0 5 15 10 0 30 15 5 0 0 20 80 % Single Unit Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0 0.0 0.0 % Heavy Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0 % Trucks (Total) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0 0.0 0.0 Peak Hour Factor (PHF) 0.25 0.58 0.00 0.00 0.60 0.00 0.00 0.25 0.00 0.25 0 .50 0.65 0.42 0.25 0.70 0.47 0.75 0.00 0.00 0.56 0.78  MD Peak Hour 2nd Street Alley 2nd Street Alley Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Peak Hour Volume 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Rounded Hourly Volume 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Single Unit Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0 0.0 0.0 % Heavy Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0 % Trucks (Total) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0 0.0 0.0 Peak Hour Factor (PHF) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 .00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00  PM Peak Hour 2nd Street Alley 2nd Street Alley Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals 4:15 PM 0 5 0 0 5 0 0 3 0 3 2 3 1 2 8 5 0 0 0 5 21 4:30 PM 0 6 0 0 6 0 0 7 0 7 1 3 4 0 8 4 0 0 0 4 25 4:45 PM 1 6 0 0 7 0 0 1 0 1 0 5 1 1 7 5 0 2 0 7 22 5:00 PM 0 8 0 0 8 0 0 2 0 2 0 4 3 0 7 3 0 1 0 4 21 Peak Hour Volume 1 25 0 0 26 0 0 13 0 13 3 15 9 3 30 17 0 3 0 20 89 Rounded Hourly Volume 0 25 0 0 25 0 0 15 0 15 5 15 10 5 35 15 0 5 0 20 95 % Single Unit Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0 0.0 0.0 % Heavy Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0 % Trucks (Total) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0 0.0 0.0 Peak Hour Factor (PHF) 0.25 0.78 0.00 0.00 0.81 0.00 0.00 0.46 0.00 0.46 0 .37 0.75 0.56 0.37 0.94 0.85 0.00 0.37 0.00 0.71 0.89 Peak Hour Pedestrian and Bicyclist Volumes Pedestrians and Bicyclists Total Ped & 2nd Street Alley 2nd Street Alley Bike 15-Minute Start Time Total Total Total Total Volume 7:15 AM 1200 3 7:30 AM 1002 3 7:45 AM 1002 3 8:00 AM 1000 1 Total 4204 1 0 12:00 PM 0000 0 12:15 PM 0000 0 12:30 PM 0000 0 12:45 PM 0000 0 Total 0000 0 4:15 PM 2304 9 4:30 PM 0011 2 4:45 PM 0104 5 5:00 PM 2025 9 Total 4 4 3 14 25 All Motor Vehicles From West From South From West Weekday West Approach From South From South From West Non-Holiday Schools Not in Session No Special Events Start Date: Tuesday, August 5, 2025 Total Number of Hours Counted: 6 AM 0 0 0 0 0 4 Bicyclist Pedestrian Crossing From North From East From North From East From East Bicyclist Wednesday, August 6, 2025 N/A 1 1 1 Pedestrian 1 0 Bicyclist 00 Pedestrian Bicyclist CrossingCrossing South Approach Pedestrian AM Peak HourMidday (MD) Peak Hour From North Tuesday, August 5, 2025 Crossing North Approach PM Peak Hour East Approach 00 0 00 20 00 20 0 00 0000 0 00 20 11 00 31 00 00 00 00 0000 00 MD 00 00 00 00 00 00 00 0 0 00 0000 00 04 PM 20 2 00 0 40 2 00 0 20 0 Intersection Traffic Volume Report 0 001 022 1 1 4 11 50 4 0 10 10 0 0 10 Page 79 of 224 Count Basics Page 4 of 13 Hourly Volume Summary - Motor Vehicle Data 2nd Street & Alley One-Hour Motor Vehicle Data  One-Hour Total Time Period 2nd Street Alley 2nd Street Alley Vehicle Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume E/W N/S 6:00 AM 0 9 0 0 9 0 0 1 0 1 0 3 1 0 4 8 1 1 0 10 24 11 13 7:00 AM 2 29 0 0 31 0 0 2 0 2 5 14 11 1 31 16 2 1 0 19 83 21 62 8:00 AM 0 17 0 0 17 0 1 5 0 6 0 4 8 4 16 10 1 0 0 11 50 17 33 9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:00 PM 2 31 1 0 34 1 2 6 0 9 1 12 7 1 21 10 1 2 0 13 77 22 55 4:00 PM 1 34 1 0 36 0 1 11 0 12 4 18 9 3 34 18 0 2 0 20 102 32 70 5:00 PM 2 25 0 0 27 0 2 8 0 10 2 16 11 2 31 24 1 1 0 26 94 36 58 6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 145 2 0 154 1 6 33 0 40 12 67 47 11 137 86 6 7 0 99 430 139 291 Volume Totals Non-Holiday DirectionalFrom South From West Weekday PM Start Date: Tuesday, August 5, 2025 Total Number of Hours Counted: 6 All Motor Vehicles Schools Not in Session No Special Events From East Intersection Traffic Volume Report Totals AMMD From North 0 5 10 15 20 25 30 35 40 0 20 40 60 80 100 120 6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM Entering Vehicle Volume By Approach (Line Chart) Total Entering Vehicle Volume (Bar Chart) One-Hour Time Period Start Time (For example, 6am represents volumes from 6am to 7am) Graphical Summary of Hourly Volumes All Motor Vehicles Southbound Approach Westbound Approach Northbound Approach Eastbound Approach Page 80 of 224 Count Basics Page 5 of 13 15-Minute Motor Vehicle Data 2nd Street & Alley 15-Minute Motor Vehicle Data  15-Minute Time Period 2nd Street Alley 2nd Street Alley 15-Min Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum PHF 6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 1 24 0.40 6:15 AM 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 1 0 0 0 1 2 38 0.63 6:30 AM 0 7 0 0 7 0 0 0 0 0 0 0 0 0 0 6 1 1 0 8 15 60 0.63 6:45 AM 0 2 0 0 2 0 0 0 0 0 0 3 1 0 4 0 0 0 0 0 6 63 0.66 7:00 AM 1 6 0 0 7 0 0 0 0 0 1 2 2 0 5 2 0 1 0 3 15 83 0.80 7:15 AM 0 13 0 0 13 0 0 0 0 0 2 4 1 1 8 2 1 0 0 3 24 81 0.78 7:30 AM 1 5 0 0 6 0 0 0 0 0 1 5 2 0 8 3 1 0 0 4 18 74 0.71 7:45 AM 0 5 0 0 5 0 0 2 0 2 1 3 6 0 10 9 0 0 0 9 26 64 0.62 8:00 AM 0 7 0 0 7 0 0 0 0 0 0 1 1 0 2 3 1 0 0 4 13 50 0.74 8:15 AM 0 5 0 0 5 0 0 4 0 4 0 2 1 0 3 5 0 0 0 5 17 8:30 AM 0 2 0 0 2 0 0 0 0 0 0 0 3 2 5 1 0 0 0 1 8 8:45 AM 0 3 0 0 3 0 1 1 0 2 0 1 3 2 6 1 0 0 0 1 12 9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:00 PM 2 6 0 0 8 0 0 2 0 2 0 2 1 1 4 5 0 0 0 5 19 77 0.88 3:15 PM 0 8 1 0 9 1 0 1 0 2 0 4 4 0 8 2 0 1 0 3 22 92 0.68 3:30 PM 0 9 0 0 9 0 1 1 0 2 0 4 1 0 5 0 1 0 0 1 17 91 0.67 3:45 PM 0 8 0 0 8 0 1 2 0 3 1 2 1 0 4 3 0 1 0 4 19 99 0.73 4:00 PM 0 17 1 0 18 0 1 0 0 1 1 7 3 0 11 4 0 0 0 4 34 102 0.75 4:15 PM 0 5 0 0 5 0 0 3 0 3 2 3 1 2 8 5 0 0 0 5 21 89 0.89 4:30 PM 0 6 0 0 6 0 0 7 0 7 1 3 4 0 8 4 0 0 0 4 25 92 0.92 4:45 PM 1 6 0 0 7 0 0 1 0 1 0 5 1 1 7 5 0 2 0 7 22 94 0.87 5:00 PM 0 8 0 0 8 0 0 2 0 2 0 4 3 0 7 3 0 1 0 4 21 94 0.87 5:15 PM 1 6 0 0 7 0 0 1 0 1 0 3 2 2 7 9 0 0 0 9 24 5:30 PM 1 6 0 0 7 0 2 5 0 7 0 3 3 0 6 6 1 0 0 7 27 5:45 PM 0 5 0 0 5 0 0 0 0 0 2 6 3 0 11 6 0 0 0 6 22 6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 145 2 0 154 1 6 33 0 40 12 67 47 11 137 86 6 7 0 99 430 Peak Hour All Vehicle Volume Summary  Hourly Total Time Period 2nd Street Alley 2nd Street Alley Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume PHF AM 7:15 AM 1 30 0 0 31 0 0 2 0 2 4 13 10 1 28 17 3 0 0 20 81 0.78 MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PM 4:15 PM 1 25 0 0 26 0 0 13 0 13 3 15 9 3 30 17 0 3 0 20 89 0.89 From North From East From South From West From West Tuesday, August 5, 2025 Total Number of Hours Counted: 6 All Motor Vehicles AM Peak Period Weekday Schools Not in Session Non-Holiday No Special Events Start Date: From North From East From South Intersection Traffic Volume Report Midday Peak PeriodPM Peak Period Totals Page 81 of 224 Count Basics Page 6 of 13 15-Minute Automobile Data 2nd Street & Alley 15-Minute Automobile Data  15-Minute Time Period 2nd Street Alley 2nd Street Alley 15-Min Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum 6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 1 22 6:15 AM 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 1 36 6:30 AM 0 7 0 0 7 0 0 0 0 0 0 0 0 0 0 6 0 1 0 7 14 59 6:45 AM 0 2 0 0 2 0 0 0 0 0 0 3 1 0 4 0 0 0 0 0 6 63 7:00 AM 1 6 0 0 7 0 0 0 0 0 1 2 2 0 5 2 0 1 0 3 15 83 7:15 AM 0 13 0 0 13 0 0 0 0 0 2 4 1 1 8 2 1 0 0 3 24 81 7:30 AM 1 5 0 0 6 0 0 0 0 0 1 5 2 0 8 3 1 0 0 4 18 74 7:45 AM 0 5 0 0 5 0 0 2 0 2 1 3 6 0 10 9 0 0 0 9 26 64 8:00 AM 0 7 0 0 7 0 0 0 0 0 0 1 1 0 2 3 1 0 0 4 13 50 8:15 AM 0 5 0 0 5 0 0 4 0 4 0 2 1 0 3 5 0 0 0 5 17 8:30 AM 0 2 0 0 2 0 0 0 0 0 0 0 3 2 5 1 0 0 0 1 8 8:45 AM 0 3 0 0 3 0 1 1 0 2 0 1 3 2 6 1 0 0 0 1 12 9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:00 PM 2 6 0 0 8 0 0 2 0 2 0 2 1 1 4 5 0 0 0 5 19 74 3:15 PM 0 7 1 0 8 1 0 1 0 2 0 4 4 0 8 2 0 1 0 3 21 88 3:30 PM 0 8 0 0 8 0 1 1 0 2 0 4 0 0 4 0 1 0 0 1 15 88 3:45 PM 0 8 0 0 8 0 1 2 0 3 1 2 1 0 4 3 0 1 0 4 19 98 4:00 PM 0 16 1 0 17 0 1 0 0 1 1 7 3 0 11 4 0 0 0 4 33 101 4:15 PM 0 5 0 0 5 0 0 3 0 3 2 3 1 2 8 5 0 0 0 5 21 89 4:30 PM 0 6 0 0 6 0 0 7 0 7 1 3 4 0 8 4 0 0 0 4 25 92 4:45 PM 1 6 0 0 7 0 0 1 0 1 0 5 1 1 7 5 0 2 0 7 22 94 5:00 PM 0 8 0 0 8 0 0 2 0 2 0 4 3 0 7 3 0 1 0 4 21 94 5:15 PM 1 6 0 0 7 0 0 1 0 1 0 3 2 2 7 9 0 0 0 9 24 5:30 PM 1 6 0 0 7 0 2 5 0 7 0 3 3 0 6 6 1 0 0 7 27 5:45 PM 0 5 0 0 5 0 0 0 0 0 2 6 3 0 11 6 0 0 0 6 22 6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 142 2 0 151 1 6 33 0 40 12 67 46 11 136 85 5 7 0 97 424 Peak Hour Automobile Volume Summary  Hourly Total Time Period 2nd Street Alley 2nd Street Alley Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume AM 7:15 AM 1 30 0 0 31 0 0 2 0 2 4 13 10 1 28 17 3 0 0 20 81 MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PM 4:15 PM 1 25 0 0 26 0 0 13 0 13 3 15 9 3 30 17 0 3 0 20 89 From North From East From South From West From South From West PM Peak Period Totals AM Peak PeriodMidday Peak Period From North From East Automobiles (Cars, Light Trucks, & Motorcycles) Intersection Traffic Volume Report Tuesday, August 5, 2025 Total Number of Hours Counted: 6 Weekday Schools Not in Session Non-Holiday No Special Events Start Date: Page 82 of 224 Count Basics Page 7 of 13 15-Minute Single Unit (SU) Truck & Bus Data 2nd Street & Alley 15-Minute Single Unit (SU) Truck & Bus Data  15-Minute Time Period 2nd Street Alley 2nd Street Alley 15-Min Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum 6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 6:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 6:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 1 6:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 3:15 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 4 3:30 PM 0 1 0 0 1 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 2 3 3:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 4:00 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 300 30 000 00 010 10 100 1 5 SU Truck %age: 0.0% 2.1% 0.0% 0.0% 1.9% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.1% 0.0% 0.7% 0.0 % 16.7% 0.0% 0.0% 1.0% 1.2% Peak Hour Single Unit (SU) Truck & Buses Volume Summary  Hourly Total Time Period 2nd Street Alley 2nd Street Alley Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume AM 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PM 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 From North From East From South From West From South From West PM Peak Period Totals AM Peak PeriodMidday Peak Period From North From East Single Unit (SU) Trucks & Buses Intersection Traffic Volume Report Tuesday, August 5, 2025 Total Number of Hours Counted: 6 Weekday Schools Not in Session Non-Holiday No Special Events Start Date: Page 83 of 224 Count Basics Page 8 of 13 15-Minute Semi-Truck Data 2nd Street & Alley 15-Minute Semi-Truck Data  15-Minute Time Period 2nd Street Alley 2nd Street Alley 15-Min Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum 6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 6:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 1 1 6:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000 00 000 00 000 01 000 1 1 Semi Truck %age: 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 1.2 % 0.0% 0.0% 0.0% 1.0% 0.2% Peak Hour Semi-Truck Volume Summary  Hourly Total Time Period 2nd Street Alley 2nd Street Alley Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume AM 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PM 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 From North From East From South From West From WestFrom East From South PM Peak Period Totals AM Peak PeriodMidday Peak Period From North Tuesday, August 5, 2025 Total Number of Hours Counted: 6 Semi-Trucks Weekday Schools Not in Session Non-Holiday No Special Events Start Date: Intersection Traffic Volume Report Page 84 of 224 Count Basics Page 9 of 13 15-Minute Heavy Vehicle Data 2nd Street & Alley 15-Minute Heavy Vehicle Data  15-Minute Time Period 2nd Street Alley 2nd Street Alley 15-Min Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum 6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 6:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 1 2 6:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 1 6:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 3:15 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 4 3:30 PM 0 1 0 0 1 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 2 3 3:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 4:00 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 300 30 000 00 010 11 100 2 6 Total Truck %age: 0.0% 2.1% 0.0% 0.0% 1.9% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.1% 0.0% 0.7% 1.2 % 16.7% 0.0% 0.0% 2.0% 1.4% Peak Hour Heavy Vehicle Volume Summary  Hourly Total Time Period 2nd Street Alley 2nd Street Alley Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume AM 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PM 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 From North From East From South From West From South From West PM Peak Period Totals AM Peak PeriodMidday Peak Period From North From East Heavy Vehicles (Single-Unit Trucks, Buses & Semi-Trucks) Intersection Traffic Volume Report Tuesday, August 5, 2025 Total Number of Hours Counted: 6 Weekday Schools Not in Session Non-Holiday No Special Events Start Date: Page 85 of 224 Count Basics Page 10 of 13 15-Minute Heavy Vehicle Percentages 2nd Street & Alley 15-Minute Heavy Vehicle Percentages  Total Hourly 15-Minute Heavy Heavy Time Period 2nd Street Alley 2nd Street Alley Vehicle Vehicle Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Percent Percent 6:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 8.3 6:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 0.0 0.0 0.0 100.0 50.0 5.3 6:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 0.0 0.0 12.5 6.7 1.7 6:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0 7:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0 7:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0 7:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0 7:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0 8:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0 8:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 8:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 8:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 9:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 9:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 9:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 9:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 10:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 10:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 10:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 10:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 11:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 11:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 11:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 11:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 12:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 12:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 12:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 12:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 1:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 1:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 1:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 1:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 2:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 2:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 2:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 2:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 3:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 3.9 3:15 PM 0.0 12.5 0.0 0.0 11.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.5 4.3 3:30 PM 0.0 11.1 0.0 0.0 11.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 0.0 20.0 0.0 0.0 0.0 0.0 0.0 11.8 3.3 3:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 1.0 4:00 PM 0.0 5.9 0.0 0.0 5.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 2.9 1.0 4:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0 4:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0 4:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0 5:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0 5:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 5:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 5:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 6:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 6:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 6:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 6:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 7:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 7:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 7:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 7:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 8:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 8:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 8:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 8:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 9:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 9:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 9:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 9:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0 2.1 0.0 0.0 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0 0.7 1.2 16.7 0.0 0.0 2.0 1. 4 Semi Truck Percentage: 0.2326 Peak Hour Heavy Vehicle Percentages Summary  Hourly Hourly Heavy Time Period 2nd Street Alley 2nd Street Alley Vehicle Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Percent AM 7:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 MD 12:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 PM 4:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 From North From East From South From West From South From WestFrom East Intersection Traffic Volume Report Start Date: Tuesday, August 5, 2025 Total Number of Hours Counted: 6 PM Peak Period Totals AM Peak PeriodMidday Peak Period From North % Weekday Schools Not in Session Non-Holiday Heavy Vehicles (Single-Unit Trucks, Buses & Semi-Trucks) No Special Events Page 86 of 224 Page 11 of 13 15-Minute Pedestrian and Bicyclist Data 2nd Street & Alley 15-Minute Pedestrian and Bicyclist Data 15-Minute Time Period 2nd Street Alley 2nd Street Alley 15-Min Hourly Start Time Total Total Total Total Totals Sum 6:00 AM 0000 0 3 6:15 AM 0000 0 5 6:30 AM 0100 1 8 6:45 AM 0002 2 1 0 7:00 AM 0002 2 1 1 7:15 AM 1200 3 1 0 7:30 AM 1002 3 1 2 7:45 AM 1002 3 1 2 8:00 AM 1000 1 1 4 8:15 AM 0104 5 8:30 AM 1011 3 8:45 AM 0311 5 9:00 AM 0000 0 9:15 AM 0000 0 9:30 AM 0000 0 9:45 AM 0000 0 10:00 AM 0000 0 10:15 AM 0000 0 10:30 AM 0000 0 10:45 AM 0000 0 11:00 AM 0000 0 11:15 AM 0000 0 11:30 AM 0000 0 11:45 AM 0000 0 12:00 PM 0000 0 12:15 PM 0000 0 12:30 PM 0000 0 12:45 PM 0000 0 1:00 PM 0000 0 1:15 PM 0000 0 1:30 PM 0000 0 1:45 PM 0000 0 2:00 PM 0000 0 2:15 PM 0000 0 2:30 PM 0000 0 2:45 PM 0000 0 3:00 PM 1103 5 9 3:15 PM 1000 1 7 3:30 PM 0001 1 1 5 3:45 PM 1001 2 1 6 4:00 PM 0111 3 1 9 4:15 PM 2304 9 2 5 4:30 PM 0011 2 2 1 4:45 PM 0104 5 2 6 5:00 PM 2025 9 2 3 5:15 PM 2111 5 5:30 PM 3013 7 5:45 PM 0101 2 6:00 PM 0000 0 6:15 PM 0000 0 6:30 PM 0000 0 6:45 PM 0000 0 7:00 PM 0000 0 7:15 PM 0000 0 7:30 PM 0000 0 7:45 PM 0000 0 8:00 PM 0000 0 8:15 PM 0000 0 8:30 PM 0000 0 8:45 PM 0000 0 9:00 PM 0000 0 9:15 PM 0000 0 9:30 PM 0000 0 9:45 PM 0000 0 17 15 8 39 79 Special Pedestrians Pedestrian Type Other (None) Tuesday, August 5, 2025 Total Number of Hours Counted: 6 Start Date: Count Basics Unknown West Approach 00 Pedestrians and Bicyclists 00 00 10 40 4 00 00 0 0 00 00 00 00 00 00 00 00 00 Crossing 0 00 00 00 0 00 00 00 000 Crossing Crossing 0 00 North Approach East Approach South Approach 00 000 00 00 00 00 00 00 0 00 00 00 PM Peak Period 00 0 0 0 0 00 0 00 10 00 11 00 00 00 1 00 00 00 00 00 00 00 00 0 00 00 00 00 00 00 00 00 0 30 00 01 30 10 10 00 01 15 0 00 01 00 0 00 00 10 10 20 21 00 10 00 10 10 10 10 00 00 00 00 00 00 10 01 00 00 00 10 10 00 30 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 0 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 000 00 0 10 10 0 11 0 00 000 4000 10 00 00 00 0 1 0 10 00 0 00 01 10 20 00 0 20 Crossing 00 0 0 10 0 0 Pedestrian Bicyclist Pedestrian 00 0 1 0 0 00 Bicyclist 0 0 0 0 AM Peak Period 0 Midday Peak Period 0 0 0 0 0 0 0 0 00 00 0 0 0 00 3 0 1 Pedestrian Bicyclist 00 00 00 0 0 00 00 0 200 3 0 00 0 00 0 00 00 0 00 00 0 0 00 00 0 Elderly/Disabled (except wheelchai Wheelchairs/Electric Scooters x x x x x x 1 or 2 A Few Several Many Weekday Schools Not in Session Non-Holiday No Special Events Totals 15 2 13 None Pre-school Children Elementry School Age Children Visually Impaired (white cane/help e 38 1 Pedestrian Bicyclist 00 5 0 2 0 1 00 00 2 20 Intersection Traffic Volume Report Page 87 of 224 Page 12 of 13 15-Minute Adult & Children Count (Manual Entry) 2nd Street & Alley 15-Minute Adult & Children Pedestrian Data 15-Minute Time Period 2nd Street Alley 2nd Street Alley 15-Min Hourly Start Time Total Total Total Total Totals Sum 12:00 AM 0000 0 0 12:15 AM 0000 0 0 12:30 AM 0000 0 0 12:45 AM 0000 0 0 1:00 AM 0000 0 0 1:15 AM 0000 0 0 1:30 AM 0000 0 0 1:45 AM 0000 0 0 2:00 AM 0000 0 0 2:15 AM 0000 0 0 2:30 AM 0000 0 0 2:45 AM 0000 0 0 3:00 AM 0000 0 0 3:15 AM 0000 0 0 3:30 AM 0000 0 0 3:45 AM 0000 0 0 4:00 AM 0000 0 0 4:15 AM 0000 0 0 4:30 AM 0000 0 0 4:45 AM 0000 0 0 5:00 AM 0000 0 0 5:15 AM 0000 0 0 5:30 AM 0000 0 0 5:45 AM 0000 0 1 6:00 AM 0000 0 3 6:15 AM 0000 0 5 6:30 AM 0100 1 8 6:45 AM 0002 2 1 0 7:00 AM 0002 2 1 0 7:15 AM 1200 3 9 7:30 AM 1002 3 1 1 7:45 AM 1001 2 1 0 8:00 AM 1000 1 1 3 8:15 AM 0104 5 1 2 8:30 AM 1001 2 7 8:45 AM 0311 5 5 9:00 AM 0000 0 0 9:15 AM 0000 0 0 9:30 AM 0000 0 0 9:45 AM 0000 0 0 10:00 AM 0000 0 0 10:15 AM 0000 0 0 10:30 AM 0000 0 0 10:45 AM 0000 0 0 11:00 AM 0000 0 0 11:15 AM 0000 0 0 11:30 AM 0000 0 0 11:45 AM 0000 0 0 12:00 PM 0000 0 0 12:15 PM 0000 0 0 12:30 PM 0000 0 0 12:45 PM 0000 0 0 1:00 PM 0000 0 0 1:15 PM 0000 0 0 1:30 PM 0000 0 0 1:45 PM 0000 0 0 2:00 PM 0000 0 0 2:15 PM 0000 0 5 2:30 PM 0000 0 5 2:45 PM 0000 0 6 3:00 PM 1103 5 8 3:15 PM 0000 0 6 3:30 PM 0001 1 1 4 3:45 PM 1001 2 1 5 4:00 PM 0111 3 1 7 4:15 PM 2204 8 2 2 4:30 PM 0011 2 1 8 4:45 PM 0004 4 2 2 5:00 PM 2015 8 2 0 5:15 PM 1111 4 1 2 5:30 PM 3003 6 8 5:45 PM 0101 2 2 6:00 PM 0000 0 0 6:15 PM 0000 0 0 6:30 PM 0000 0 0 6:45 PM 0000 0 0 7:00 PM 0000 0 0 7:15 PM 0000 0 0 7:30 PM 0000 0 0 7:45 PM 0000 0 0 8:00 PM 0000 0 0 8:15 PM 0000 0 0 8:30 PM 0000 0 0 8:45 PM 0000 0 0 9:00 PM 0000 0 0 9:15 PM 0000 0 0 9:30 PM 0000 0 0 9:45 PM 0000 0 0 10:00 PM 0000 0 0 10:15 PM 0000 0 0 10:30 PM 0000 0 0 10:45 PM 0000 0 0 11:00 PM 0000 0 0 11:15 PM 0000 0 11:30 PM 0000 0 11:45 PM 0000 0 15 13 5 38 71 Count Basics Start Date: Tuesday, August 5, 2025 Weekday Schools Not in Session Total Number of Hours Counted: 6 Non-Holiday No Special Events Adults Children Adults Children Adults Children Adults Children Adults & Children Crossing Crossing Crossing Crossing North Approach East Approach South Approach West Approach 0 000 0 0 00 0 02 010 2 1200 000 2 1001 100 0 0104 100 1 0311 100 0 0000 000 0 Midday Peak Period 0 0000 000 0 0 0 0000 000 0 0000 000 0 0000 000 0 0000 000 0 0000 000 PM Peak Period 000 00 000 000 0 0000 0 00 1103 0 1 1001 000 1 2204 011 1 0004 001 5 1111 201 3 0101 300 0 0000 000 0 0000 000 0 0000 000 0 0000 000 0 0000 000 0 0000 000 0 0000 000 0 0000 000 03 8 0Totals 15 0 13 0 5 0 0 0 00 00 0 0 0 0 0 0 0 0 0 0 00 AM Peak Period Pre-AM Peak Period 0000 0000 0000 0 000 0000 0000 000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0 0 0 0 0 0 0000 0000 0000 0000 Intersection Traffic Volume Report 0000 0000 Post PM Peak Period 000 Page 88 of 224 Count Basics Page 13 of 1 3 15-Minute Bicycle Turning Movement Count (Manual Entry) 2nd Street & Alley 15-Minute Bicycle Data  15-Minute Time Period 2nd Street Alley 2nd Street Alley 15-Min Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum 12:00 AM 0000 0 0 12:15 AM 0000 0 0 12:30 AM 0000 0 0 12:45 AM 0000 0 0 1:00 AM 0000 0 0 1:15 AM 0000 0 0 1:30 AM 0000 0 0 1:45 AM 0000 0 0 2:00 AM 0000 0 0 2:15 AM 0000 0 0 2:30 AM 0000 0 0 2:45 AM 0000 0 0 3:00 AM 0000 0 0 3:15 AM 0000 0 0 3:30 AM 0000 0 0 3:45 AM 0000 0 0 4:00 AM 0000 0 0 4:15 AM 0000 0 0 4:30 AM 0000 0 0 4:45 AM 0000 0 0 5:00 AM 0000 0 0 5:15 AM 0000 0 0 5:30 AM 0000 0 0 5:45 AM 0000 0 0 6:00 AM 0000 0 0 6:15 AM 0000 0 0 6:30 AM 0000 0 0 6:45 AM 0000 0 0 7:00 AM 0000 0 0 7:15 AM 0000 0 0 7:30 AM 0000 0 0 7:45 AM 0000 0 0 8:00 AM 0000 0 0 8:15 AM 0000 0 0 8:30 AM 0000 0 0 8:45 AM 0000 0 0 9:00 AM 0000 0 0 9:15 AM 0000 0 0 9:30 AM 0000 0 0 9:45 AM 0000 0 0 10:00 AM 0000 0 0 10:15 AM 0000 0 0 10:30 AM 0000 0 0 10:45 AM 0000 0 0 11:00 AM 0000 0 0 11:15 AM 0000 0 0 11:30 AM 0000 0 0 11:45 AM 0000 0 0 12:00 PM 0000 0 0 12:15 PM 0000 0 0 12:30 PM 0000 0 0 12:45 PM 0000 0 0 1:00 PM 0000 0 0 1:15 PM 0000 0 0 1:30 PM 0000 0 0 1:45 PM 0000 0 0 2:00 PM 0000 0 0 2:15 PM 0000 0 0 2:30 PM 0000 0 0 2:45 PM 0000 0 0 3:00 PM 0000 0 0 3:15 PM 0000 0 0 3:30 PM 0000 0 0 3:45 PM 0000 0 0 4:00 PM 0000 0 0 4:15 PM 0000 0 0 4:30 PM 0000 0 0 4:45 PM 0000 0 0 5:00 PM 0000 0 0 5:15 PM 0000 0 0 5:30 PM 0000 0 0 5:45 PM 0000 0 0 6:00 PM 0000 0 0 6:15 PM 0000 0 0 6:30 PM 0000 0 0 6:45 PM 0000 0 0 7:00 PM 0000 0 0 7:15 PM 0000 0 0 7:30 PM 0000 0 0 7:45 PM 0000 0 0 8:00 PM 0000 0 0 8:15 PM 0000 0 0 8:30 PM 0000 0 0 8:45 PM 0000 0 0 9:00 PM 0000 0 0 9:15 PM 0000 0 0 9:30 PM 0000 0 0 9:45 PM 0000 0 0 10:00 PM 0000 0 0 10:15 PM 0000 0 0 10:30 PM 0000 0 0 10:45 PM 0000 0 0 11:00 PM 0000 0 0 11:15 PM 0000 0 11:30 PM 0000 0 11:45 PM 0000 0 0 000 00 000 00 000 00 000 0 0 Peak Hour Bicycle Turning Movement Volume Summary  Hourly Total Time Period 2nd Street Alley 2nd Street Alley Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume AM 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PM 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 From North From East From South From West Post PM Peak Period AM Peak PeriodPM Peak Period Totals Schools Not in Session Total Number of Hours Counted: 6 Non-Holiday No Special Events Midday Peak Period Bicyclists From North Pre-AM Peak Period Start Date: Tuesday, August 5, 2025 Weekday From East From South From West Intersection Traffic Volume Report Page 89 of 224 Count Basics Special Report 15-Minute Motor Vehicle Data (Daily & Seasonally Adjusted) 2nd Street & Alley 15-Minute Motor Vehicle Data  15-Minute Time Period 2nd Street Alley 2nd Street Alley 15-Min Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum PHF 12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 1 22 0.42 6:15 AM 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 1 0 0 0 1 2 35 0.63 6:30 AM 0 6 0 0 6 0 0 0 0 0 0 0 0 0 0 5 1 1 0 7 13 55 0.63 6:45 AM 0 2 0 0 2 0 0 0 0 0 0 3 1 0 4 0 0 0 0 0 6 58 0.66 7:00 AM 1 5 0 0 6 0 0 0 0 0 1 2 2 0 5 2 0 1 0 3 14 75 0.82 7:15 AM 0 11 0 0 11 0 0 0 0 0 2 4 1 1 8 2 1 0 0 3 22 73 0.79 7:30 AM 1 4 0 0 5 0 0 0 0 0 1 4 2 0 7 3 1 0 0 4 16 66 0.72 7:45 AM 0 4 0 0 4 0 0 2 0 2 1 3 5 0 9 8 0 0 0 8 23 58 0.63 8:00 AM 0 6 0 0 6 0 0 0 0 0 0 1 1 0 2 3 1 0 0 4 12 47 0.78 8:15 AM 0 4 0 0 4 0 0 4 0 4 0 2 1 0 3 4 0 0 0 4 15 8:30 AM 0 2 0 0 2 0 0 0 0 0 0 0 3 2 5 1 0 0 0 1 8 8:45 AM 0 3 0 0 3 0 1 1 0 2 0 1 3 2 6 1 0 0 0 1 12 9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:00 PM 2 5 0 0 7 0 0 2 0 2 0 2 1 1 4 4 0 0 0 4 17 72 0.86 3:15 PM 0 7 1 0 8 1 0 1 0 2 0 4 4 0 8 2 0 1 0 3 21 86 0.69 3:30 PM 0 8 0 0 8 0 1 1 0 2 0 4 1 0 5 0 1 0 0 1 16 84 0.68 3:45 PM 0 7 0 0 7 0 1 2 0 3 1 2 1 0 4 3 0 1 0 4 18 91 0.73 4:00 PM 0 15 1 0 16 0 1 0 0 1 1 6 3 0 10 4 0 0 0 4 31 92 0.74 4:15 PM 0 4 0 0 4 0 0 3 0 3 2 3 1 2 8 4 0 0 0 4 19 81 0.88 4:30 PM 0 5 0 0 5 0 0 6 0 6 1 3 4 0 8 4 0 0 0 4 23 84 0.91 4:45 PM 1 5 0 0 6 0 0 1 0 1 0 4 1 1 6 4 0 2 0 6 19 85 0.89 5:00 PM 0 7 0 0 7 0 0 2 0 2 0 4 3 0 7 3 0 1 0 4 20 85 0.89 5:15 PM 1 5 0 0 6 0 0 1 0 1 0 3 2 2 7 8 0 0 0 8 22 5:30 PM 1 5 0 0 6 0 2 4 0 6 0 3 3 0 6 5 1 0 0 6 24 5:45 PM 0 4 0 0 4 0 0 0 0 0 2 5 3 0 10 5 0 0 0 5 19 6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 124 2 0 133 1 6 31 0 38 12 63 46 11 132 77 6 7 0 90 393 Peak Hour All Vehicle Volume Summary  Hourly Total Time Period 2nd Street Alley 2nd Street Alley Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume PHF AM 7:15 AM 1 25 0 0 26 0 0 2 0 2 4 12 9 1 26 16 3 0 0 19 73 0.79 MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PM 4:15 PM 1 21 0 0 22 0 0 12 0 12 3 14 9 3 29 15 0 3 0 18 81 0.88 From South From West Schools Not in Session Total Number of Hours Counted: 6 Non-Holiday No Special Events Start Date: Tuesday, August 5, 2025 WeekdayIntersection Traffic Volume Report All Motor Vehicles From North From East From South From West From East PM Peak Period Totals Post PM Peak Period Midday Peak Period From North AM Peak Period Pre-AM Peak Period Page 90 of 224 Version 2025.03 Page 1 of 13 Base Information, Observed (6) Hour and Estimated (24) Hour Volume Summaries Major St: Main Street Minor St: 2nd Street Main Street & 2nd Street Site Information Count Information SW-M ↑ AM MD PM AM MD PM 0.877 2.359 Company Name 1.000 Comments Observed 6 Hour Volume Summary 6 PED: 59 BIKE: 9 64 31 180 0     PED:  83 PED: 59  2039 48  208  0 ↑ 0  North 35  BIKE: 2053  BIKE: 19 94  6    0 108 23 267 PED: 70 BIKE: 6 Estimated 24 Hour AADT 132 64 373 0      172  4220  431  0 ↑ 0  North 72  4249  195     Daily/Seasonal Factor 0.877 0 224 48 553 Count Expansion Factor 2.359 Manual Adjustment Factor 1.000 Total 24 Hr Expansion Factor 2.070 7:15-8:15am North Leg 2nd Street Clear and Dry Clear and Dry AM Peak Period Weather Wednesday, August 6, 2025 Wednesday, August 6, 2025 Midday Peak Period PM Peak Period Tuesday, August 5, 2025 Peak Hours Selected for Analysis Calculated Peak Hours Clear and Dry West Leg Main Street South Leg 2nd Street 7:15-8:15am Traffic Control Traffic Signal AM Peak Period Midday Peak Period PM Peak Period Amy Scheuerlein Amy Scheuerlein Observers Special Pedestrians Observed None None Manual Adj. Elementry school age children Pre-school children TADI None 2211 Other (describe) None None TOTAL ENTERING VOLUME None Wis DOT Daily & Seasonal Factors are final for 2012 through 2024, and 2025 uses 2024 final factors. None NoneWheelchairs/electric scooters Elderly/disabled (except wheelchairs) Visually impaired (white cane/helper dog) 2500 141  2330 Main Street 333 398 731 569 2nd Street  689 824 1,513 292  4823 4576  Roadway Names North Direction 4:15-5:15pm 4:15-5:15pm 9,997 Main Street  5175 10,732 TOTAL ENTERING VOLUME  5,185 275 4,830 Main Street 9,093 2nd Street ESTIMATED 2nd Street Total Entering Hourly Volume Main Street 4,393 2182  Count Basics Schools Not in Session 1st Day of Count Tuesday, August 5, 2025 No Special Events Tuesday, August 5, 2025 Total Number of Hours Counted: 6 Start Date: County Intersection of: WisDOT Region13 - Dane Weekday Non-Holiday Municipality Village of Mt Horeb Hrs Counted: 06:00 AM-09:00 AM and 03:00 PM-06:00 PM Intersection Traffic Volume Report Special Considerations East Leg Main Street Holidays None Special Events None (1) Non-Interstate Low Truck %Count Expansion Group Daily/Seasonal Adjustment Factor Schools Not in Session Count Expansion Factor (1) Non-Interstate Low Truck %Daily/Seasonal Adjustment Group 24 HOUR AADT 861 HOUR VOLUMES 416 OBSERVED 2nd Street 4516  456 802 774 000000 894 1158 1101 0 0 1,000 2,000 6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM Motor Vehicle Volume One-Hour Time Period Start Time (Ex: 6am represents volume from 6am to 7am) Page 91 of 224 Page 2 of 13 Peak Hour Volume Graphical Summary Main Street & 2nd Street AM Peak Hour Summary PED: 0 BIKE: 2 9 2 41 0 Manual Adj. 1.000   PED:  14 PED: 3  222 2  30  0 ↑ 0  North 9  BIKE: 402  BIKE: 12 0  1    01 8 6 6 5 PED: 9 BIKE: 1 Midday (MD) Peak Hour Summary PED: 0 BIKE: 0 0 0 0 0 Manual Adj. 1.000   PED:  0 PED: 0  00  0  0 ↑ 0  North 0  BIKE: 0  BIKE: 00  0    00 0 0 PED: 0 BIKE: 0 PM Peak Hour Summary PED: 5 BIKE: 0 18 7 36 0 Manual Adj. 1.000   PED:  22 PED: 12  571 4  48  0 ↑ 0  North 2  BIKE: 373  BIKE: 81 1  1    02 9 7 4 7 PED: 6 BIKE: 1 Count Basics Start Date: Tuesday, August 5, 2025 Total Number of Hours Counted: 6 2nd Street  66 83 149 0 0 0 0 1,097 386  456 Weekday Non-Holiday All Motor Vehicles 641 Main Street 61 31  TOTAL ENTERING VOLUME 1,171 2nd Street  0 Main Street 0  0  508 TOTAL ENTERING VOLUME Main Street 618  PM PEAK HOUR 2nd Street 4:15-5:15pm 92 1,004 Main Street 0   0 0 0 0 0 MD PEAK HOUR 141 2nd Street 2nd Street  52 89 Intersection Traffic Volume Report Wednesday, August 6, 2025 N/A Tuesday, August 5, 2025 Schools Not in Session No Special Events AM PEAK HOUR 2nd Street TOTAL ENTERING VOLUME 7:15-8:15am 81 838 52 29  249  Main Street 266 Main Street 680 774 431 Page 92 of 224 Count Basics Page 3 of 13 Peak Hour Volume Summary Main Street & 2nd Street Peak Hour Volumes, Truck Percentages, and PHFs  AM Peak Hour 2nd Street Main Street 2nd Street Main Street Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals 7:15 AM 4 0 12 0 16 3 43 4 0 50 13 2 7 0 22 1 105 3 0 109 197 7:30 AM 1 0 8 0 9 4 58 7 0 69 17 1 3 0 21 7 101 3 0 111 210 7:45 AM 0 2 14 0 16 6 67 11 0 84 21 2 6 0 29 5 95 3 0 103 232 8:00 AM 4 0 7 0 11 1 54 8 0 63 14 1 2 0 17 7 101 0 0 108 199 Peak Hour Volume 9 2 41 0 52 14 222 30 0 266 65 6 18 0 89 20 402 9 0 431 838 Rounded Hourly Volume 10 0 40 0 50 15 220 30 0 265 65 5 20 0 90 20 400 10 0 430 835 % Single Unit Trucks 11.1 0.0 0.0 0.0 1.9 0.0 8.1 0.0 0.0 6.8 0.0 16.7 5.6 0. 0 2.2 0.0 8.5 0.0 0.0 7.9 6.6 % Heavy Trucks 0.0 0.0 0.0 0.0 0.0 0.0 1.8 6.7 0.0 2.3 0.0 0.0 0.0 0.0 0.0 5.0 0 .2 0.0 0.0 0.5 1.0 % Trucks (Total) 11.1 0.0 0.0 0.0 1.9 0.0 9.9 6.7 0.0 9.0 0.0 16.7 5.6 0.0 2.2 5.0 8.7 0.0 0.0 8.4 7.5 Peak Hour Factor (PHF) 0.56 0.25 0.73 0.00 0.81 0.58 0.83 0.68 0.00 0.79 0 .77 0.75 0.64 0.00 0.77 0.71 0.96 0.75 0.00 0.97 0.90  MD Peak Hour 2nd Street Main Street 2nd Street Main Street Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Peak Hour Volume 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Rounded Hourly Volume 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Single Unit Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0 0.0 0.0 % Heavy Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0 % Trucks (Total) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0 0.0 0.0 Peak Hour Factor (PHF) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 .00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00  PM Peak Hour 2nd Street Main Street 2nd Street Main Street Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals 4:15 PM 4 3 7 0 14 7 143 9 0 159 14 1 5 0 20 2 92 0 0 94 287 4:30 PM 7 2 10 0 19 8 144 16 0 168 13 1 10 0 24 6 110 1 0 117 328 4:45 PM 4 1 8 0 13 2 125 15 0 142 10 4 9 0 23 3 78 0 0 81 259 5:00 PM 3 1 11 0 15 5 159 8 0 172 10 1 5 0 16 0 93 1 0 94 297 Peak Hour Volume 18 7 36 0 61 22 571 48 0 641 47 7 29 0 83 11 373 2 0 386 1171 Rounded Hourly Volume 20 5 35 0 60 20 570 50 0 640 45 5 30 0 80 10 375 0 0 385 1165 % Single Unit Trucks 0.0 0.0 0.0 0.0 0.0 4.5 4.4 0.0 0.0 4.1 0.0 0.0 3.4 0.0 1 .2 0.0 3.2 50.0 0.0 3.4 3.4 % Heavy Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0 .5 0.0 0.0 0.5 0.4 % Trucks (Total) 0.0 0.0 0.0 0.0 0.0 4.5 4.9 0.0 0.0 4.5 0.0 0.0 3.4 0.0 1.2 0. 0 3.8 50.0 0.0 3.9 3.8 Peak Hour Factor (PHF) 0.64 0.58 0.82 0.00 0.80 0.69 0.90 0.75 0.00 0.93 0 .84 0.44 0.72 0.00 0.86 0.46 0.85 0.50 0.00 0.82 0.89 Peak Hour Pedestrian and Bicyclist Volumes Pedestrians and Bicyclists Total Ped & 2nd Street Main Street 2nd Street Main Street Bike 15-Minute Start Time Total Total Total Total Volume 7:15 AM 0140 5 7:30 AM 0221 5 7:45 AM 2001 3 8:00 AM 0042 6 Total 2 3 10 4 19 12:00 PM 0000 0 12:15 PM 0000 0 12:30 PM 0000 0 12:45 PM 0000 0 Total 0000 0 4:15 PM 2106 9 4:30 PM 0225 9 4:45 PM 3006 9 5:00 PM 0253 1 0 Total 5 5 7 20 37 All Motor Vehicles From West From South From West Weekday West Approach From South From South From West Non-Holiday Schools Not in Session No Special Events Start Date: Tuesday, August 5, 2025 Total Number of Hours Counted: 6 AM 2 0 2 0 0 0 Bicyclist Pedestrian Crossing From North From East From North From East From East Bicyclist Wednesday, August 6, 2025 N/A 0 0 0 Pedestrian 0 0 Bicyclist 40 Pedestrian Bicyclist CrossingCrossing South Approach Pedestrian AM Peak HourMidday (MD) Peak Hour From North Tuesday, August 5, 2025 Crossing North Approach PM Peak Hour East Approach 91 0 00 10 11 21 0 00 0000 0 00 01 10 20 31 40 11 00 00 0000 00 MD 00 00 00 00 00 00 00 0 0 00 0000 00 02 PM 20 1 30 0 50 4 00 2 00 1 Intersection Traffic Volume Report 1 000 816 1 1 2 41 21 3 4 20 50 3 0 00 Page 93 of 224 Count Basics Page 4 of 13 Hourly Volume Summary - Motor Vehicle Data Main Street & 2nd Street One-Hour Motor Vehicle Data  One-Hour Total Time Period 2nd Street Main Street 2nd Street Main Street Vehicle Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume E/W N/S 6:00 AM 6 1 12 0 19 2 126 10 0 138 26 0 6 0 32 6 258 3 0 267 456 405 51 7:00 AM 6 3 39 0 48 14 211 26 0 251 64 5 19 0 88 13 388 14 0 415 802 666 136 8:00 AM 7 2 26 0 35 11 245 38 0 294 49 4 11 0 64 18 361 2 0 381 774 675 99 9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:00 PM 10 8 30 0 48 15 394 31 0 440 39 2 22 0 63 20 318 5 0 343 894 783 111 4:00 PM 21 9 37 0 67 23 545 49 0 617 52 8 35 0 95 15 361 3 0 379 1158 996 162 5:00 PM 14 8 36 0 58 18 518 54 0 590 37 4 15 0 56 22 367 8 0 397 1101 987 114 6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 64 31 180 0 275 83 2039 208 0 2330 267 23 108 0 398 94 2053 35 0 2182 5185 4512 673 Volume Totals Non-Holiday DirectionalFrom South From West Weekday PM Start Date: Tuesday, August 5, 2025 Total Number of Hours Counted: 6 All Motor Vehicles Schools Not in Session No Special Events From East Intersection Traffic Volume Report Totals AMMD From North 0 100 200 300 400 500 600 700 0 200 400 600 800 1000 1200 1400 6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM Entering Vehicle Volume By Approach (Line Chart) Total Entering Vehicle Volume (Bar Chart) One-Hour Time Period Start Time (For example, 6am represents volumes from 6am to 7am) Graphical Summary of Hourly Volumes All Motor Vehicles Southbound Approach Westbound Approach Northbound Approach Eastbound Approach Page 94 of 224 Count Basics Page 5 of 13 15-Minute Motor Vehicle Data Main Street & 2nd Street 15-Minute Motor Vehicle Data  15-Minute Time Period 2nd Street Main Street 2nd Street Main Street 15-Min Hour ly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum PHF 6:00 AM 0 0 1 0 1 0 20 1 0 21 5 0 1 0 6 1 41 0 0 42 70 456 0.78 6:15 AM 0 1 2 0 3 0 39 3 0 42 5 0 1 0 6 0 56 1 0 57 108 549 0.84 6:30 AM 5 0 6 0 11 0 30 3 0 33 5 0 3 0 8 1 79 0 0 80 132 638 0.81 6:45 AM 1 0 3 0 4 2 37 3 0 42 11 0 1 0 12 4 82 2 0 88 146 716 0.85 7:00 AM 1 1 5 0 7 1 43 4 0 48 13 0 3 0 16 0 87 5 0 92 163 802 0.86 7:15 AM 4 0 12 0 16 3 43 4 0 50 13 2 7 0 22 1 105 3 0 109 197 838 0.90 7:30 AM 1 0 8 0 9 4 58 7 0 69 17 1 3 0 21 7 101 3 0 111 210 832 0.90 7:45 AM 0 2 14 0 16 6 67 11 0 84 21 2 6 0 29 5 95 3 0 103 232 811 0.87 8:00 AM 4 0 7 0 11 1 54 8 0 63 14 1 2 0 17 7 101 0 0 108 199 774 0.97 8:15 AM 2 0 12 0 14 1 56 11 0 68 15 1 1 0 17 5 86 1 0 92 191 8:30 AM 1 0 3 0 4 4 74 12 0 90 10 1 2 0 13 5 77 0 0 82 189 8:45 AM 0 2 4 0 6 5 61 7 0 73 10 1 6 0 17 1 97 1 0 99 195 9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:00 PM 3 4 7 0 14 4 94 5 0 103 9 0 6 0 15 6 70 1 0 77 209 894 0.93 3:15 PM 2 2 7 0 11 6 101 5 0 112 10 1 5 0 16 6 84 1 0 91 230 969 0.85 3:30 PM 3 0 6 0 9 2 84 8 0 94 10 1 5 0 16 5 89 2 0 96 215 1026 0.89 3:45 PM 2 2 10 0 14 3 115 13 0 131 10 0 6 0 16 3 75 1 0 79 240 1139 0.87 4:00 PM 6 3 12 0 21 6 133 9 0 148 15 2 11 0 28 4 81 2 0 87 284 1158 0.88 4:15 PM 4 3 7 0 14 7 143 9 0 159 14 1 5 0 20 2 92 0 0 94 287 1171 0.89 4:30 PM 7 2 10 0 19 8 144 16 0 168 13 1 10 0 24 6 110 1 0 117 328 1164 0.89 4:45 PM 4 1 8 0 13 2 125 15 0 142 10 4 9 0 23 3 78 0 0 81 259 1118 0.94 5:00 PM 3 1 11 0 15 5 159 8 0 172 10 1 5 0 16 0 93 1 0 94 297 1101 0.93 5:15 PM 3 1 9 0 13 4 114 10 0 128 11 0 2 0 13 6 118 2 0 126 280 5:30 PM 7 3 9 0 19 3 134 19 0 156 7 2 3 0 12 11 83 1 0 95 282 5:45 PM 1 3 7 0 11 6 111 17 0 134 9 1 5 0 15 5 73 4 0 82 242 6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 64 31 180 0 275 83 2039 208 0 2330 267 23 108 0 398 94 2053 35 0 2182 5185 Peak Hour All Vehicle Volume Summary  Hourly Total Time Period 2nd Street Main Street 2nd Street Main Street Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume PHF AM 7:15 AM 9 2 41 0 52 14 222 30 0 266 65 6 18 0 89 20 402 9 0 431 838 0.90 MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PM 4:15 PM 18 7 36 0 61 22 571 48 0 641 47 7 29 0 83 11 373 2 0 386 1171 0.89 From North From East From South From West From West Tuesday, August 5, 2025 Total Number of Hours Counted: 6 All Motor Vehicles AM Peak Period Weekday Schools Not in Session Non-Holiday No Special Events Start Date: From North From East From South Intersection Traffic Volume Report Midday Peak PeriodPM Peak Period Totals Page 95 of 224 Count Basics Page 6 of 13 15-Minute Automobile Data Main Street & 2nd Street 15-Minute Automobile Data  15-Minute Time Period 2nd Street Main Street 2nd Street Main Street 15-Min Hour ly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum 6:00 AM 0 0 1 0 1 0 19 1 0 20 5 0 1 0 6 1 40 0 0 41 68 432 6:15 AM 0 0 2 0 2 0 38 3 0 41 5 0 1 0 6 0 50 1 0 51 100 519 6:30 AM 5 0 6 0 11 0 27 3 0 30 5 0 2 0 7 1 71 0 0 72 120 596 6:45 AM 1 0 3 0 4 2 36 3 0 41 11 0 1 0 12 4 81 2 0 87 144 672 7:00 AM 1 1 5 0 7 1 40 4 0 45 13 0 3 0 16 0 82 5 0 87 155 746 7:15 AM 4 0 12 0 16 3 42 3 0 48 13 1 6 0 20 1 89 3 0 93 177 775 7:30 AM 1 0 8 0 9 4 49 7 0 60 17 1 3 0 21 6 97 3 0 106 196 779 7:45 AM 0 2 14 0 16 6 59 11 0 76 21 2 6 0 29 5 89 3 0 97 218 766 8:00 AM 3 0 7 0 10 1 50 7 0 58 14 1 2 0 17 7 92 0 0 99 184 733 8:15 AM 2 0 12 0 14 1 50 11 0 62 15 1 1 0 17 5 82 1 0 88 181 8:30 AM 1 0 3 0 4 4 69 12 0 85 10 1 2 0 13 5 76 0 0 81 183 8:45 AM 0 2 4 0 6 5 58 7 0 70 9 1 6 0 16 1 91 1 0 93 185 9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:00 PM 3 4 7 0 14 4 89 5 0 98 9 0 6 0 15 5 68 1 0 74 201 855 3:15 PM 2 2 6 0 10 6 98 5 0 109 10 1 5 0 16 6 80 1 0 87 222 919 3:30 PM 3 0 5 0 8 1 79 8 0 88 10 1 5 0 16 5 89 2 0 96 208 974 3:45 PM 2 2 10 0 14 3 105 11 0 119 9 0 6 0 15 3 72 1 0 76 224 1078 4:00 PM 5 3 12 0 20 6 119 9 0 134 15 2 11 0 28 4 77 2 0 83 265 1104 4:15 PM 4 3 7 0 14 6 136 9 0 151 14 1 5 0 20 2 90 0 0 92 277 1126 4:30 PM 7 2 10 0 19 8 134 16 0 158 13 1 10 0 24 6 104 1 0 111 312 1125 4:45 PM 4 1 8 0 13 2 119 15 0 136 10 4 9 0 23 3 75 0 0 78 250 1091 5:00 PM 3 1 11 0 15 5 154 8 0 167 10 1 4 0 15 0 90 0 0 90 287 1078 5:15 PM 3 1 9 0 13 4 112 10 0 126 11 0 2 0 13 6 116 2 0 124 276 5:30 PM 7 3 9 0 19 3 131 19 0 153 7 2 3 0 12 11 82 1 0 94 278 5:45 PM 1 3 7 0 11 6 109 17 0 132 9 1 5 0 15 5 70 4 0 79 237 6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 62 30 178 0 270 81 1922 204 0 2207 265 22 105 0 392 92 1953 34 0 2079 4948 Peak Hour Automobile Volume Summary  Hourly Total Time Period 2nd Street Main Street 2nd Street Main Street Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume AM 7:15 AM 8 2 41 0 51 14 200 28 0 242 65 5 17 0 87 19 367 9 0 395 775 MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PM 4:15 PM 18 7 36 0 61 21 543 48 0 612 47 7 28 0 82 11 359 1 0 371 1126 From North From East From South From West From South From West PM Peak Period Totals AM Peak PeriodMidday Peak Period From North From East Automobiles (Cars, Light Trucks, & Motorcycles) Intersection Traffic Volume Report Tuesday, August 5, 2025 Total Number of Hours Counted: 6 Weekday Schools Not in Session Non-Holiday No Special Events Start Date: Page 96 of 224 Count Basics Page 7 of 13 15-Minute Single Unit (SU) Truck & Bus Data Main Street & 2nd Street 15-Minute Single Unit (SU) Truck & Bus Data  15-Minute Time Period 2nd Street Main Street 2nd Street Main Street 15-Min Hour ly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum 6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 19 6:15 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 4 0 0 4 5 22 6:30 AM 0 0 0 0 0 0 3 0 0 3 0 0 1 0 1 0 8 0 0 8 12 35 6:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 36 7:00 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 3 0 0 3 4 47 7:15 AM 0 0 0 0 0 0 1 0 0 1 0 1 1 0 2 0 15 0 0 15 18 55 7:30 AM 0 0 0 0 0 0 9 0 0 9 0 0 0 0 0 0 4 0 0 4 13 45 7:45 AM 0 0 0 0 0 0 6 0 0 6 0 0 0 0 0 0 6 0 0 6 12 37 8:00 AM 1 0 0 0 1 0 2 0 0 2 0 0 0 0 0 0 9 0 0 9 12 34 8:15 AM 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 4 0 0 4 8 8:30 AM 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 1 0 0 1 5 8:45 AM 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 6 0 0 6 9 9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:00 PM 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 1 2 0 0 3 7 34 3:15 PM 0 0 1 0 1 0 3 0 0 3 0 0 0 0 0 0 3 0 0 3 7 44 3:30 PM 0 0 1 0 1 1 4 0 0 5 0 0 0 0 0 0 0 0 0 0 6 47 3:45 PM 0 0 0 0 0 0 8 2 0 10 1 0 0 0 1 0 3 0 0 3 14 55 4:00 PM 1 0 0 0 1 0 13 0 0 13 0 0 0 0 0 0 3 0 0 3 17 48 4:15 PM 0 0 0 0 0 1 7 0 0 8 0 0 0 0 0 0 2 0 0 2 10 40 4:30 PM 0 0 0 0 0 0 8 0 0 8 0 0 0 0 0 0 6 0 0 6 14 32 4:45 PM 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 0 2 0 0 2 7 22 5:00 PM 0 0 0 0 0 0 5 0 0 5 0 0 1 0 1 0 2 1 0 3 9 19 5:15 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 5:30 PM 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 1 0 0 1 4 5:45 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 2 0 0 2 4 6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 020 42 9 7201 0 11 130 51 8 910 9 12 0 1 SU Truck %age: 3.1% 0.0% 1.1% 0.0% 1.5% 2.4% 4.8% 1.0% 0.0% 4.3% 0.4% 4.3% 2.8% 0.0% 1.3% 1.1 % 4.3% 2.9% 0.0% 4.2% 3.9% Peak Hour Single Unit (SU) Truck & Buses Volume Summary  Hourly Total Time Period 2nd Street Main Street 2nd Street Main Street Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume AM 7:15 AM 1 0 0 0 1 0 18 0 0 18 0 1 1 0 2 0 34 0 0 34 55 MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PM 4:15 PM 0 0 0 0 0 1 25 0 0 26 0 0 1 0 1 0 12 1 0 13 40 From North From East From South From West From South From West PM Peak Period Totals AM Peak PeriodMidday Peak Period From North From East Single Unit (SU) Trucks & Buses Intersection Traffic Volume Report Tuesday, August 5, 2025 Total Number of Hours Counted: 6 Weekday Schools Not in Session Non-Holiday No Special Events Start Date: Page 97 of 224 Count Basics Page 8 of 13 15-Minute Semi-Truck Data Main Street & 2nd Street 15-Minute Semi-Truck Data  15-Minute Time Period 2nd Street Main Street 2nd Street Main Street 15-Min Hour ly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum 6:00 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 5 6:15 AM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 3 8 6:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 6:45 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 8 7:00 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 2 0 0 2 4 9 7:15 AM 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 1 0 0 1 2 8 7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 1 8 7:45 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 2 8 8:00 AM 0 0 0 0 0 0 2 1 0 3 0 0 0 0 0 0 0 0 0 0 3 7 8:15 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 2 8:30 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 8:45 AM 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 1 9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:00 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 5 3:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 6 3:30 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 5 3:45 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 2 6 4:00 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 6 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 4:30 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 2 7 4:45 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 5 5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 4 5:15 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 10 2 020 2 21 000 11 1 100 1 2 3 6 Semi Truck %age: 0.0% 3.2% 0.0% 0.0% 0.4% 0.0% 1.0% 1.0% 0.0% 0.9% 0.4% 0.0% 0.0% 0.0% 0.3% 1.1 % 0.5% 0.0% 0.0% 0.5% 0.7% Peak Hour Semi-Truck Volume Summary  Hourly Total Time Period 2nd Street Main Street 2nd Street Main Street Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume AM 7:15 AM 0 0 0 0 0 0 4 2 0 6 0 0 0 0 0 1 1 0 0 2 8 MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PM 4:15 PM 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 2 0 0 2 5 From North From East From South From West From WestFrom East From South PM Peak Period Totals AM Peak PeriodMidday Peak Period From North Tuesday, August 5, 2025 Total Number of Hours Counted: 6 Semi-Trucks Weekday Schools Not in Session Non-Holiday No Special Events Start Date: Intersection Traffic Volume Report Page 98 of 224 Count Basics Page 9 of 13 15-Minute Heavy Vehicle Data Main Street & 2nd Street 15-Minute Heavy Vehicle Data  15-Minute Time Period 2nd Street Main Street 2nd Street Main Street 15-Min Hour ly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum 6:00 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 24 6:15 AM 0 1 0 0 1 0 1 0 0 1 0 0 0 0 0 0 6 0 0 6 8 30 6:30 AM 0 0 0 0 0 0 3 0 0 3 0 0 1 0 1 0 8 0 0 8 12 42 6:45 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 44 7:00 AM 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 5 0 0 5 8 56 7:15 AM 0 0 0 0 0 0 1 1 0 2 0 1 1 0 2 0 16 0 0 16 20 63 7:30 AM 0 0 0 0 0 0 9 0 0 9 0 0 0 0 0 1 4 0 0 5 14 53 7:45 AM 0 0 0 0 0 0 8 0 0 8 0 0 0 0 0 0 6 0 0 6 14 45 8:00 AM 1 0 0 0 1 0 4 1 0 5 0 0 0 0 0 0 9 0 0 9 15 41 8:15 AM 0 0 0 0 0 0 6 0 0 6 0 0 0 0 0 0 4 0 0 4 10 8:30 AM 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 0 1 0 0 1 6 8:45 AM 0 0 0 0 0 0 3 0 0 3 1 0 0 0 1 0 6 0 0 6 10 9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:00 PM 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 1 2 0 0 3 8 39 3:15 PM 0 0 1 0 1 0 3 0 0 3 0 0 0 0 0 0 4 0 0 4 8 50 3:30 PM 0 0 1 0 1 1 5 0 0 6 0 0 0 0 0 0 0 0 0 0 7 52 3:45 PM 0 0 0 0 0 0 10 2 0 12 1 0 0 0 1 0 3 0 0 3 16 61 4:00 PM 1 0 0 0 1 0 14 0 0 14 0 0 0 0 0 0 4 0 0 4 19 54 4:15 PM 0 0 0 0 0 1 7 0 0 8 0 0 0 0 0 0 2 0 0 2 10 45 4:30 PM 0 0 0 0 0 0 10 0 0 10 0 0 0 0 0 0 6 0 0 6 16 39 4:45 PM 0 0 0 0 0 0 6 0 0 6 0 0 0 0 0 0 3 0 0 3 9 27 5:00 PM 0 0 0 0 0 0 5 0 0 5 0 0 1 0 1 0 3 1 0 4 10 23 5:15 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 2 0 0 2 4 5:30 PM 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 1 0 0 1 4 5:45 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 3 0 0 3 5 6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 1 2 0 5 2 117 4 0 123 2 1 3 0 6 2 100 1 0 103 237 Total Truck %age: 3.1% 3.2% 1.1% 0.0% 1.8% 2.4% 5.7% 1.9% 0.0% 5.3% 0.7% 4.3% 2.8% 0.0% 1.5% 2.1 % 4.9% 2.9% 0.0% 4.7% 4.6% Peak Hour Heavy Vehicle Volume Summary  Hourly Total Time Period 2nd Street Main Street 2nd Street Main Street Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume AM 7:15 AM 1 0 0 0 1 0 22 2 0 24 0 1 1 0 2 1 35 0 0 36 63 MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PM 4:15 PM 0 0 0 0 0 1 28 0 0 29 0 0 1 0 1 0 14 1 0 15 45 From North From East From South From West From South From West PM Peak Period Totals AM Peak PeriodMidday Peak Period From North From East Heavy Vehicles (Single-Unit Trucks, Buses & Semi-Trucks) Intersection Traffic Volume Report Tuesday, August 5, 2025 Total Number of Hours Counted: 6 Weekday Schools Not in Session Non-Holiday No Special Events Start Date: Page 99 of 224 Count Basics Page 10 of 13 15-Minute Heavy Vehicle Percentages Main Street & 2nd Street 15-Minute Heavy Vehicle Percentages  Total Hourly 15-Minute Heavy Heavy Time Period 2nd Street Main Street 2nd Street Main Street Vehicle Veh icle Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Percent Percent 6:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 5.0 0.0 0.0 4.8 0.0 0.0 0.0 0.0 0.0 0.0 2.4 0.0 0. 0 2.4 2.9 5.3 6:15 AM 0.0 100.0 0.0 0.0 33.3 0.0 2.6 0.0 0.0 2.4 0.0 0.0 0.0 0.0 0.0 0.0 10.7 0 .0 0.0 10.5 7.4 5.5 6:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 10.0 0.0 0.0 9.1 0.0 0.0 33.3 0.0 12.5 0.0 10.1 0 .0 0.0 10.0 9.1 6.6 6:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 2.7 0.0 0.0 2.4 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0 0. 0 1.1 1.4 6.1 7:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 7.0 0.0 0.0 6.3 0.0 0.0 0.0 0.0 0.0 0.0 5.7 0.0 0. 0 5.4 4.9 7.0 7:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 2.3 25.0 0.0 4.0 0.0 50.0 14.3 0.0 9.1 0.0 15.2 0 .0 0.0 14.7 10.2 7.5 7:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 15.5 0.0 0.0 13.0 0.0 0.0 0.0 0.0 0.0 14.3 4.0 0. 0 0.0 4.5 6.7 6.4 7:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 11.9 0.0 0.0 9.5 0.0 0.0 0.0 0.0 0.0 0.0 6.3 0.0 0 .0 5.8 6.0 5.5 8:00 AM 25.0 0.0 0.0 0.0 9.1 0.0 7.4 12.5 0.0 7.9 0.0 0.0 0.0 0.0 0.0 0.0 8.9 0.0 0.0 8.3 7.5 5.3 8:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 10.7 0.0 0.0 8.8 0.0 0.0 0.0 0.0 0.0 0.0 4.7 0.0 0 .0 4.3 5.2 8:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 6.8 0.0 0.0 5.6 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.0 0. 0 1.2 3.2 8:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 4.9 0.0 0.0 4.1 10.0 0.0 0.0 0.0 5.9 0.0 6.2 0.0 0 .0 6.1 5.1 9:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 9:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 9:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 9:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 10:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 10:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 10:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 10:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 11:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 11:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 11:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 11:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 12:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 12:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 12:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 12:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 1:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 1:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 1:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 1:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 2:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 2:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 2:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 2:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 3:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 5.3 0.0 0.0 4.9 0.0 0.0 0.0 0.0 0.0 16.7 2.9 0.0 0 .0 3.9 3.8 4.4 3:15 PM 0.0 0.0 14.3 0.0 9.1 0.0 3.0 0.0 0.0 2.7 0.0 0.0 0.0 0.0 0.0 0.0 4.8 0.0 0 .0 4.4 3.5 5.2 3:30 PM 0.0 0.0 16.7 0.0 11.1 50.0 6.0 0.0 0.0 6.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 3.3 5.1 3:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 8.7 15.4 0.0 9.2 10.0 0.0 0.0 0.0 6.3 0.0 4.0 0.0 0.0 3.8 6.7 5.4 4:00 PM 16.7 0.0 0.0 0.0 4.8 0.0 10.5 0.0 0.0 9.5 0.0 0.0 0.0 0.0 0.0 0.0 4.9 0.0 0.0 4.6 6.7 4.7 4:15 PM 0.0 0.0 0.0 0.0 0.0 14.3 4.9 0.0 0.0 5.0 0.0 0.0 0.0 0.0 0.0 0.0 2.2 0.0 0 .0 2.1 3.5 3.8 4:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 6.9 0.0 0.0 6.0 0.0 0.0 0.0 0.0 0.0 0.0 5.5 0.0 0. 0 5.1 4.9 3.4 4:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 4.8 0.0 0.0 4.2 0.0 0.0 0.0 0.0 0.0 0.0 3.8 0.0 0. 0 3.7 3.5 2.4 5:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 3.1 0.0 0.0 2.9 0.0 0.0 20.0 0.0 6.3 0.0 3.2 100. 0 0.0 4.3 3.4 2.1 5:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 1.8 0.0 0.0 1.6 0.0 0.0 0.0 0.0 0.0 0.0 1.7 0.0 0. 0 1.6 1.4 5:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 2.2 0.0 0.0 1.9 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0 0. 0 1.1 1.4 5:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 1.8 0.0 0.0 1.5 0.0 0.0 0.0 0.0 0.0 0.0 4.1 0.0 0. 0 3.7 2.1 6:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 6:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 6:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 6:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 7:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 7:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 7:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 7:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 8:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 8:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 8:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 8:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 9:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 9:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 9:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 9:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 3.1 3.2 1.1 0.0 1.8 2.4 5.7 1.9 0.0 5.3 0.7 4.3 2.8 0.0 1.5 2.1 4.9 2.9 0.0 4.7 4.6 Semi Truck Percentage: 0.6943 Peak Hour Heavy Vehicle Percentages Summary  Hourly Hourly Heavy Time Period 2nd Street Main Street 2nd Street Main Street Vehicle Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Percent AM 7:15 AM 11.1 0.0 0.0 0.0 1.9 0.0 9.9 6.7 0.0 9.0 0.0 16.7 5.6 0.0 2.2 5.0 8.7 0.0 0.0 8.4 7.5 MD 12:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 PM 4:15 PM 0.0 0.0 0.0 0.0 0.0 4.5 4.9 0.0 0.0 4.5 0.0 0.0 3.4 0.0 1.2 0.0 3.8 50.0 0 .0 3.9 3.8 From North From East From South From West From South From WestFrom East Intersection Traffic Volume Report Start Date: Tuesday, August 5, 2025 Total Number of Hours Counted: 6 PM Peak Period Totals AM Peak PeriodMidday Peak Period From North % Weekday Schools Not in Session Non-Holiday Heavy Vehicles (Single-Unit Trucks, Buses & Semi-Trucks) No Special Events Page 100 of 224 Page 11 of 13 15-Minute Pedestrian and Bicyclist Data Main Street & 2nd Street 15-Minute Pedestrian and Bicyclist Data 15-Minute Time Period 2nd Street Main Street 2nd Street Main Street 15-Min Hour ly Start Time Total Total Total Total Totals Sum 6:00 AM 0020 2 9 6:15 AM 0030 3 9 6:30 AM 0010 1 1 1 6:45 AM 2010 3 1 5 7:00 AM 0011 2 1 5 7:15 AM 0140 5 1 9 7:30 AM 0221 5 2 4 7:45 AM 2001 3 3 3 8:00 AM 0042 6 4 3 8:15 AM 0226 1 0 8:30 AM 1337 1 4 8:45 AM 0436 1 3 9:00 AM 0000 0 9:15 AM 0000 0 9:30 AM 0000 0 9:45 AM 0000 0 10:00 AM 0000 0 10:15 AM 0000 0 10:30 AM 0000 0 10:45 AM 0000 0 11:00 AM 0000 0 11:15 AM 0000 0 11:30 AM 0000 0 11:45 AM 0000 0 12:00 PM 0000 0 12:15 PM 0000 0 12:30 PM 0000 0 12:45 PM 0000 0 1:00 PM 0000 0 1:15 PM 0000 0 1:30 PM 0000 0 1:45 PM 0000 0 2:00 PM 0000 0 2:15 PM 0000 0 2:30 PM 0000 0 2:45 PM 0000 0 3:00 PM 9 8 13 2 32 102 3:15 PM 13 4 5 3 25 85 3:30 PM 9646 2 5 6 9 3:45 PM 5384 2 0 5 3 4:00 PM 3255 1 5 4 2 4:15 PM 2106 9 3 7 4:30 PM 0225 9 5 6 4:45 PM 3006 9 6 3 5:00 PM 0253 1 0 6 5 5:15 PM 13 8 2 5 28 5:30 PM 3445 1 6 5:45 PM 3224 1 1 6:00 PM 0000 0 6:15 PM 0000 0 6:30 PM 0000 0 6:45 PM 0000 0 7:00 PM 0000 0 7:15 PM 0000 0 7:30 PM 0000 0 7:45 PM 0000 0 8:00 PM 0000 0 8:15 PM 0000 0 8:30 PM 0000 0 8:45 PM 0000 0 9:00 PM 0000 0 9:15 PM 0000 0 9:30 PM 0000 0 9:45 PM 0000 0 68 54 76 78 276 Special Pedestrians Pedestrian Type Other (None) Tuesday, August 5, 2025 Total Number of Hours Counted: 6 Start Date: Count Basics Unknown West Approach 00 Pedestrians and Bicyclists 00 00 41 33 2 00 00 0 0 00 00 00 00 00 00 00 00 00 Crossing 0 00 00 00 0 00 00 00 000 Crossing Crossing 0 00 North Approach East Approach South Approach 00 000 00 00 00 00 00 00 0 00 00 00 PM Peak Period 00 0 0 0 0 00 0 30 20 20 13 0 00 00 00 4 00 00 00 00 00 00 00 00 0 00 00 00 00 00 00 00 00 0 30 40 40 50 80 20 01 14 12 1 30 00 00 4 00 20 20 50 20 10 00 40 30 02 50 50 41 21 53 12 54 60 40 42 1 1 24 05 0 00 90 71 1 3 0 20 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 0 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 000 00 3 30 60 0 14 0 00 000 4200 20 00 04 02 2 0 0 00 11 0 00 01 00 10 40 0 01 Crossing 00 0 0 02 0 0 Pedestrian Bicyclist Pedestrian 00 0 0 0 0 00 Bicyclist 0 0 0 0 AM Peak Period 0 Midday Peak Period 2 0 0 0 0 0 0 0 03 00 0 0 0 00 4 0 1 Pedestrian Bicyclist 20 00 00 0 0 30 10 0 010 6 0 11 0 00 2 00 00 0 00 00 0 1 00 00 0 Elderly/Disabled (except wheelchai Wheelchairs/Electric Scooters x x x x x x 1 or 2 A Few Several Many Weekday Schools Not in Session Non-Holiday No Special Events Totals 59 9 48 None Pre-school Children Elementry School Age Children Visually Impaired (white cane/help e 59 19 Pedestrian Bicyclist 00 70 0 6 0 0 00 00 0 10 Intersection Traffic Volume Report Page 101 of 224 Page 12 of 13 15-Minute Adult & Children Count (Manual Entry) Main Street & 2nd Street 15-Minute Adult & Children Pedestrian Data 15-Minute Time Period 2nd Street Main Street 2nd Street Main Street 15-Min Hour ly Start Time Total Total Total Total Totals Sum 12:00 AM 0000 0 0 12:15 AM 0000 0 0 12:30 AM 0000 0 0 12:45 AM 0000 0 0 1:00 AM 0000 0 0 1:15 AM 0000 0 0 1:30 AM 0000 0 0 1:45 AM 0000 0 0 2:00 AM 0000 0 0 2:15 AM 0000 0 0 2:30 AM 0000 0 0 2:45 AM 0000 0 0 3:00 AM 0000 0 0 3:15 AM 0000 0 0 3:30 AM 0000 0 0 3:45 AM 0000 0 0 4:00 AM 0000 0 0 4:15 AM 0000 0 0 4:30 AM 0000 0 0 4:45 AM 0000 0 0 5:00 AM 0000 0 0 5:15 AM 0000 0 2 5:30 AM 0000 0 5 5:45 AM 0000 0 6 6:00 AM 0020 2 9 6:15 AM 0030 3 9 6:30 AM 0010 1 1 1 6:45 AM 2010 3 1 2 7:00 AM 0011 2 1 0 7:15 AM 0140 5 1 4 7:30 AM 0110 2 1 7 7:45 AM 0001 1 2 5 8:00 AM 0042 6 3 7 8:15 AM 0224 8 3 1 8:30 AM 1324 1 0 2 3 8:45 AM 0436 1 3 1 3 9:00 AM 0000 0 0 9:15 AM 0000 0 0 9:30 AM 0000 0 0 9:45 AM 0000 0 0 10:00 AM 0000 0 0 10:15 AM 0000 0 0 10:30 AM 0000 0 0 10:45 AM 0000 0 0 11:00 AM 0000 0 0 11:15 AM 0000 0 0 11:30 AM 0000 0 0 11:45 AM 0000 0 0 12:00 PM 0000 0 0 12:15 PM 0000 0 0 12:30 PM 0000 0 0 12:45 PM 0000 0 0 1:00 PM 0000 0 0 1:15 PM 0000 0 0 1:30 PM 0000 0 0 1:45 PM 0000 0 0 2:00 PM 0000 0 0 2:15 PM 0000 0 3 1 2:30 PM 0000 0 5 2 2:45 PM 0000 0 7 1 3:00 PM 9 7 13 2 31 86 3:15 PM 11 4 5 1 21 68 3:30 PM 5644 1 9 5 2 3:45 PM 4254 1 5 4 2 4:00 PM 3055 1 3 3 3 4:15 PM 2102 5 2 7 4:30 PM 0225 9 4 9 4:45 PM 3003 6 5 6 5:00 PM 0142 7 6 1 5:15 PM 13 8 2 4 27 54 5:30 PM 3445 1 6 2 7 5:45 PM 3224 1 1 1 1 6:00 PM 0000 0 0 6:15 PM 0000 0 0 6:30 PM 0000 0 0 6:45 PM 0000 0 0 7:00 PM 0000 0 0 7:15 PM 0000 0 0 7:30 PM 0000 0 0 7:45 PM 0000 0 0 8:00 PM 0000 0 0 8:15 PM 0000 0 0 8:30 PM 0000 0 0 8:45 PM 0000 0 0 9:00 PM 0000 0 0 9:15 PM 0000 0 0 9:30 PM 0000 0 0 9:45 PM 0000 0 0 10:00 PM 0000 0 0 10:15 PM 0000 0 0 10:30 PM 0000 0 0 10:45 PM 0000 0 0 11:00 PM 0000 0 0 11:15 PM 0000 0 11:30 PM 0000 0 11:45 PM 0000 0 59 48 70 59 236 Count Basics Start Date: Tuesday, August 5, 2025 Weekday Schools Not in Session Total Number of Hours Counted: 6 Non-Holiday No Special Events Adults Children Adults Children Adults Children Adults Children Adults & Children Crossing Crossing Crossing Crossing North Approach East Approach South Approach West Approach 0 000 0 3 20 0 10 001 1 0140 001 0 0001 011 2 0224 004 4 0436 132 0 0000 000 0 Midday Peak Period 0 0000 000 0 0 0 0000 000 0 0000 000 0 0000 000 0 0000 000 0 0000 000 PM Peak Period 000 00 000 11 4 5 0 0000 0 00 9 7 13 2 1 4 4254 564 5 2102 305 5 3003 022 2 1 3 824 014 5 3224 344 0 0000 000 0 0000 000 0 0000 000 0 0000 000 0 0000 000 0 0000 000 0 0000 000 0 0000 000 05 9 0Totals 59 0 48 0 70 0 0 0 00 00 0 0 0 0 0 0 0 0 0 0 20 AM Peak Period Pre-AM Peak Period 0000 0000 0000 0 000 0000 0000 000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0 0 0 0 0 0 0000 0000 0000 0000 Intersection Traffic Volume Report 0000 0000 Post PM Peak Period 000 Page 102 of 224 Count Basics Page 13 of 1 3 15-Minute Bicycle Turning Movement Count (Manual Entry) Main Street & 2nd Street 15-Minute Bicycle Data  15-Minute Time Period 2nd Street Main Street 2nd Street Main Street 15-Min Hour ly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum 12:00 AM 0000 0 0 12:15 AM 0000 0 0 12:30 AM 0000 0 0 12:45 AM 0000 0 0 1:00 AM 0000 0 0 1:15 AM 0000 0 0 1:30 AM 0000 0 0 1:45 AM 0000 0 0 2:00 AM 0000 0 0 2:15 AM 0000 0 0 2:30 AM 0000 0 0 2:45 AM 0000 0 0 3:00 AM 0000 0 0 3:15 AM 0000 0 0 3:30 AM 0000 0 0 3:45 AM 0000 0 0 4:00 AM 0000 0 0 4:15 AM 0000 0 0 4:30 AM 0000 0 0 4:45 AM 0000 0 0 5:00 AM 0000 0 0 5:15 AM 0000 0 0 5:30 AM 0000 0 0 5:45 AM 0000 0 0 6:00 AM 0000 0 0 6:15 AM 0000 0 0 6:30 AM 0000 0 0 6:45 AM 0000 0 0 7:00 AM 0000 0 0 7:15 AM 0000 0 0 7:30 AM 0000 0 0 7:45 AM 0000 0 0 8:00 AM 0000 0 0 8:15 AM 0000 0 0 8:30 AM 0000 0 0 8:45 AM 0000 0 0 9:00 AM 0000 0 0 9:15 AM 0000 0 0 9:30 AM 0000 0 0 9:45 AM 0000 0 0 10:00 AM 0000 0 0 10:15 AM 0000 0 0 10:30 AM 0000 0 0 10:45 AM 0000 0 0 11:00 AM 0000 0 0 11:15 AM 0000 0 0 11:30 AM 0000 0 0 11:45 AM 0000 0 0 12:00 PM 0000 0 0 12:15 PM 0000 0 0 12:30 PM 0000 0 0 12:45 PM 0000 0 0 1:00 PM 0000 0 0 1:15 PM 0000 0 0 1:30 PM 0000 0 0 1:45 PM 0000 0 0 2:00 PM 0000 0 0 2:15 PM 0000 0 0 2:30 PM 0000 0 0 2:45 PM 0000 0 0 3:00 PM 0000 0 0 3:15 PM 0000 0 0 3:30 PM 0000 0 0 3:45 PM 0000 0 0 4:00 PM 0000 0 0 4:15 PM 0000 0 0 4:30 PM 0000 0 0 4:45 PM 0000 0 0 5:00 PM 0000 0 0 5:15 PM 0000 0 0 5:30 PM 0000 0 0 5:45 PM 0000 0 0 6:00 PM 0000 0 0 6:15 PM 0000 0 0 6:30 PM 0000 0 0 6:45 PM 0000 0 0 7:00 PM 0000 0 0 7:15 PM 0000 0 0 7:30 PM 0000 0 0 7:45 PM 0000 0 0 8:00 PM 0000 0 0 8:15 PM 0000 0 0 8:30 PM 0000 0 0 8:45 PM 0000 0 0 9:00 PM 0000 0 0 9:15 PM 0000 0 0 9:30 PM 0000 0 0 9:45 PM 0000 0 0 10:00 PM 0000 0 0 10:15 PM 0000 0 0 10:30 PM 0000 0 0 10:45 PM 0000 0 0 11:00 PM 0000 0 0 11:15 PM 0000 0 11:30 PM 0000 0 11:45 PM 0000 0 0 000 00 000 00 000 00 000 0 0 Peak Hour Bicycle Turning Movement Volume Summary  Hourly Total Time Period 2nd Street Main Street 2nd Street Main Street Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume AM 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PM 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 From North From East From South From West Post PM Peak Period AM Peak PeriodPM Peak Period Totals Schools Not in Session Total Number of Hours Counted: 6 Non-Holiday No Special Events Midday Peak Period Bicyclists From North Pre-AM Peak Period Start Date: Tuesday, August 5, 2025 Weekday From East From South From West Intersection Traffic Volume Report Page 103 of 224 Count Basics Special Report 15-Minute Motor Vehicle Data (Daily & Seasonally Adjusted) Main Street & 2nd Street 15-Minute Motor Vehicle Data  15-Minute Time Period 2nd Street Main Street 2nd Street Main Street 15-Min Hour ly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum PHF 12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:00 AM 0 0 1 0 1 0 18 1 0 19 4 0 1 0 5 1 36 0 0 37 62 402 0.77 6:15 AM 0 1 2 0 3 0 34 3 0 37 4 0 1 0 5 0 49 1 0 50 95 483 0.84 6:30 AM 4 0 5 0 9 0 26 3 0 29 4 0 3 0 7 1 69 0 0 70 115 563 0.80 6:45 AM 1 0 3 0 4 2 32 3 0 37 10 0 1 0 11 4 72 2 0 78 130 634 0.85 7:00 AM 1 1 4 0 6 1 38 4 0 43 11 0 3 0 14 0 76 4 0 80 143 707 0.87 7:15 AM 4 0 11 0 15 3 38 4 0 45 11 2 6 0 19 1 92 3 0 96 175 739 0.91 7:30 AM 1 0 7 0 8 4 51 6 0 61 15 1 3 0 19 6 89 3 0 98 186 732 0.90 7:45 AM 0 2 12 0 14 5 59 10 0 74 18 2 5 0 25 4 83 3 0 90 203 714 0.88 8:00 AM 4 0 6 0 10 1 47 7 0 55 12 1 2 0 15 6 89 0 0 95 175 683 0.98 8:15 AM 2 0 11 0 13 1 49 10 0 60 13 1 1 0 15 4 75 1 0 80 168 8:30 AM 1 0 3 0 4 4 65 11 0 80 9 1 2 0 12 4 68 0 0 72 168 8:45 AM 0 2 4 0 6 4 54 6 0 64 9 1 5 0 15 1 85 1 0 87 172 9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:00 PM 3 4 6 0 13 4 82 4 0 90 8 0 5 0 13 5 61 1 0 67 183 786 0.93 3:15 PM 2 2 6 0 10 5 89 4 0 98 9 1 4 0 14 5 74 1 0 80 202 854 0.85 3:30 PM 3 0 5 0 8 2 74 7 0 83 9 1 4 0 14 4 78 2 0 84 189 904 0.90 3:45 PM 2 2 9 0 13 3 101 11 0 115 9 0 5 0 14 3 66 1 0 70 212 1003 0.87 4:00 PM 5 3 11 0 19 5 117 8 0 130 13 2 10 0 25 4 71 2 0 77 251 1020 0.89 4:15 PM 4 3 6 0 13 6 125 8 0 139 12 1 4 0 17 2 81 0 0 83 252 1031 0.89 4:30 PM 6 2 9 0 17 7 126 14 0 147 11 1 9 0 21 5 97 1 0 103 288 1027 0.89 4:45 PM 4 1 7 0 12 2 110 13 0 125 9 4 8 0 21 3 68 0 0 71 229 989 0.94 5:00 PM 3 1 10 0 14 4 140 7 0 151 9 1 4 0 14 0 82 1 0 83 262 972 0.93 5:15 PM 3 1 8 0 12 4 100 9 0 113 10 0 2 0 12 5 104 2 0 111 248 5:30 PM 6 3 8 0 17 3 118 17 0 138 6 2 3 0 11 10 73 1 0 84 250 5:45 PM 1 3 6 0 10 5 97 15 0 117 8 1 4 0 13 4 64 4 0 72 212 6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 60 31 160 0 251 75 1790 185 0 2050 233 23 95 0 351 82 1802 34 0 1918 4570 Peak Hour All Vehicle Volume Summary  Hourly Total Time Period 2nd Street Main Street 2nd Street Main Street Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume PHF AM 7:15 AM 9 2 36 0 47 13 195 27 0 235 56 6 16 0 78 17 353 9 0 379 739 0.91 MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PM 4:15 PM 17 7 32 0 56 19 501 42 0 562 41 7 25 0 73 10 328 2 0 340 1031 0.89 From South From West Schools Not in Session Total Number of Hours Counted: 6 Non-Holiday No Special Events Start Date: Tuesday, August 5, 2025 WeekdayIntersection Traffic Volume Report All Motor Vehicles From North From East From South From West From East PM Peak Period Totals Post PM Peak Period Midday Peak Period From North AM Peak Period Pre-AM Peak Period Page 104 of 224 Version 2025.03 Page 1 of 13 Base Information, Observed (6) Hour and Estimated (24) Hour Volume Summaries Major St: Main Street Minor St: 3rd Street Main Street & 3rd Street Site Information Count Information SW-M ↑ AM MD PM AM MD PM 0.877 2.359 Company Name 1.000 Comments Observed 6 Hour Volume Summary 6 PED: 47 BIKE: 0 19 1 30 0     PED:  56 PED: 48  2334 1  121  1 ↑ 0  North 20  BIKE: 2455  BIKE: 32 9  3    0 7 1 164 PED: 61 BIKE: 0 Estimated 24 Hour AADT 39 2 62 0      116  4831  250  2 ↑ 0  North 41  5082  60     Daily/Seasonal Factor 0.877 0 14 2 339 Count Expansion Factor 2.359 Manual Adjustment Factor 1.000 Total 24 Hr Expansion Factor 2.070 Special Considerations East Leg Main Street Holidays None Special Events None (1) Non-Interstate Low Truck %Count Expansion Group Daily/Seasonal Adjustment Factor Schools Not in Session Count Expansion Factor (1) Non-Interstate Low Truck %Daily/Seasonal Adjustment Group 24 HOUR AADT 263 HOUR VOLUMES 127 OBSERVED 3rd Street 5183  Count Basics Schools Not in Session 1st Day of Count Tuesday, August 5, 2025 No Special Events Tuesday, August 5, 2025 Total Number of Hours Counted: 6 Start Date: County Intersection of: WisDOT Region13 - Dane Weekday Non-Holiday Municipality Village of Mt Horeb Hrs Counted: 06:00 AM-09:00 AM and 03:00 PM-06:00 PM Intersection Traffic Volume Report Roadway Names North Direction 4:15-5:15pm 4:15-5:15pm 10,685 Main Street  5485 10,842 TOTAL ENTERING VOLUME  5,238 50 5,162 Main Street 10,068 3rd Street ESTIMATED 3rd Street Total Entering Hourly Volume Main Street 4,864 2504  3rd Street  313 356 669 159  5200 4885  2650 77  2512 Main Street 151 172 323 103 2360 Other (describe) None None TOTAL ENTERING VOLUME None Wis DOT Daily & Seasonal Factors are final for 2012 through 2024, and 2025 uses 2024 final factors. None NoneWheelchairs/electric scooters Elderly/disabled (except wheelchairs) Visually impaired (white cane/helper dog) AM Peak Period Midday Peak Period PM Peak Period Miovision Miovision Observers Special Pedestrians Observed None None Manual Adj. Elementry school age children Pre-school children TADI Mioribion 7:15-8:15am North Leg 3rd Street Clear and Dry Clear and Dry AM Peak Period Weather Wednesday, August 6, 2025 Wednesday, August 6, 2025 Midday Peak Period PM Peak Period Tuesday, August 5, 2025 Peak Hours Selected for Analysis Calculated Peak Hours Clear and Dry West Leg Main Street South Leg 3rd Street 7:30-8:30am Traffic Control Partial Stop Control 454 799 821 000000 868 1205 1091 0 0 1,000 2,000 6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM Motor Vehicle Volume One-Hour Time Period Start Time (Ex: 6am represents volume from 6am to 7am) Page 105 of 224 Page 2 of 13 Peak Hour Volume Graphical Summary Main Street & 3rd Street AM Peak Hour Summary PED: 3 BIKE: 0 3 0 9 0 Manual Adj. 1.000   PED:  8 PED: 5  273 0  37  0 ↑ 0  North 7  BIKE: 484  BIKE: 01 3  0    01 01 2 PED: 8 BIKE: 0 Midday (MD) Peak Hour Summary PED: 0 BIKE: 0 0 0 0 0 Manual Adj. 1.000   PED:  0 PED: 0  00  0  0 ↑ 0  North 0  BIKE: 0  BIKE: 00  0    00 0 0 PED: 0 BIKE: 0 PM Peak Hour Summary PED: 4 BIKE: 0 5 0 4 0 Manual Adj. 1.000   PED:  17 PED: 10  646 0  9  1 ↑ 0  North 3  BIKE: 456  BIKE: 11  0    00 17 0 PED: 2 BIKE: 0 Intersection Traffic Volume Report Wednesday, August 6, 2025 N/A Tuesday, August 5, 2025 Schools Not in Session No Special Events AM PEAK HOUR 3rd Street TOTAL ENTERING VOLUME 7:15-8:15am 27 847 12 15  277  Main Street 318 Main Street 781 823 504 0 0 0 MD PEAK HOUR 63 3rd Street 3rd Street  50 13 Main Street 651  PM PEAK HOUR 3rd Street 4:15-5:15pm 30 1,111 Main Street 0   0 0 1,204 460  531 Weekday Non-Holiday All Motor Vehicles 673 Main Street 9 21  TOTAL ENTERING VOLUME 1,213 3rd Street  0 Main Street 0  0  505 TOTAL ENTERING VOLUME 3rd Street  10 71 81 0 0 0 0 Count Basics Start Date: Tuesday, August 5, 2025 Total Number of Hours Counted: 6 Page 106 of 224 Count Basics Page 3 of 13 Peak Hour Volume Summary Main Street & 3rd Street Peak Hour Volumes, Truck Percentages, and PHFs  AM Peak Hour 3rd Street Main Street 3rd Street Main Street Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals 7:15 AM 0 0 3 0 3 1 53 7 0 61 3 0 0 0 3 0 127 1 0 128 195 7:30 AM 2 0 2 0 4 3 63 5 0 71 5 0 0 0 5 6 118 2 0 126 206 7:45 AM 0 0 3 0 3 2 88 12 0 102 2 0 0 0 2 2 128 2 0 132 239 8:00 AM 1 0 1 0 2 2 69 13 0 84 2 0 1 0 3 5 111 2 0 118 207 Peak Hour Volume 3 0 9 0 12 8 273 37 0 318 12 0 1 0 13 13 484 7 0 504 847 Rounded Hourly Volume 5 0 10 0 15 10 275 35 0 320 10 0 0 0 10 15 485 5 0 505 850 % Single Unit Trucks 0.0 0.0 0.0 0.0 0.0 0.0 5.1 0.0 0.0 4.4 0.0 0.0 0.0 0.0 0 .0 0.0 3.9 0.0 0.0 3.8 3.9 % Heavy Trucks 0.0 0.0 0.0 0.0 0.0 0.0 1.5 0.0 0.0 1.3 0.0 0.0 100.0 0.0 7.7 0. 0 0.2 0.0 0.0 0.2 0.7 % Trucks (Total) 0.0 0.0 0.0 0.0 0.0 0.0 6.6 0.0 0.0 5.7 0.0 0.0 100.0 0.0 7.7 0.0 4.1 0.0 0.0 4.0 4.6 Peak Hour Factor (PHF) 0.37 0.00 0.75 0.00 0.75 0.67 0.78 0.71 0.00 0.78 0 .60 0.00 0.25 0.00 0.65 0.54 0.95 0.87 0.00 0.95 0.89  MD Peak Hour 3rd Street Main Street 3rd Street Main Street Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Peak Hour Volume 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Rounded Hourly Volume 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Single Unit Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0 0.0 0.0 % Heavy Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0 % Trucks (Total) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 0.0 0.0 0.0 Peak Hour Factor (PHF) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 .00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00  PM Peak Hour 3rd Street Main Street 3rd Street Main Street Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals 4:15 PM 0 0 1 0 1 3 160 0 1 164 23 1 0 0 24 1 110 1 0 112 301 4:30 PM 2 0 1 0 3 5 168 2 0 175 24 0 0 0 24 0 138 0 0 138 340 4:45 PM 2 0 2 0 4 7 143 4 0 154 9 0 0 0 9 0 95 2 0 97 264 5:00 PM 1 0 0 0 1 2 175 3 0 180 14 0 0 0 14 0 113 0 0 113 308 Peak Hour Volume 5 0 4 0 9 17 646 9 1 673 70 1 0 0 71 1 456 3 0 460 1213 Rounded Hourly Volume 5 0 5 0 10 15 645 10 0 670 70 0 0 0 70 0 455 5 0 460 1210 % Single Unit Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 0.0 0.7 0.0 0.0 0.0 0.0 0 .0 0.0 1.1 0.0 0.0 1.1 0.8 % Heavy Trucks 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0 .4 0.0 0.0 0.4 0.3 % Trucks (Total) 0.0 0.0 0.0 0.0 0.0 0.0 1.1 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0. 0 1.5 0.0 0.0 1.5 1.2 Peak Hour Factor (PHF) 0.62 0.00 0.50 0.00 0.56 0.61 0.92 0.56 0.25 0.93 0 .73 0.25 0.00 0.00 0.74 0.25 0.83 0.37 0.00 0.83 0.89 Peak Hour Pedestrian and Bicyclist Volumes Pedestrians and Bicyclists Total Ped & 3rd Street Main Street 3rd Street Main Street Bike 15-Minute Start Time Total Total Total Total Volume 7:15 AM 2041 7 7:30 AM 0011 2 7:45 AM 0012 3 8:00 AM 1021 4 Total 3085 1 6 12:00 PM 0000 0 12:15 PM 0000 0 12:30 PM 0000 0 12:45 PM 0000 0 Total 0000 0 4:15 PM 2006 8 4:30 PM 0000 0 4:45 PM 1013 5 5:00 PM 1012 4 Total 4 0 2 11 17 Intersection Traffic Volume Report 0 100 102 0 1 0 10 11 3 0 00 00 0 0 00 06 PM 20 0 10 0 40 0 00 0 10 0 0 00 0000 00 00 0000 00 MD 00 00 00 00 00 00 00 00 00 0000 0 10 10 20 10 50 40 10 10 80 0 00 00 00 00 AM Peak HourMidday (MD) Peak Hour From North Tuesday, August 5, 2025 Crossing North Approach PM Peak Hour East Approach Pedestrian Bicyclist CrossingCrossing South Approach Pedestrian 1 0 0 Pedestrian 2 0 Bicyclist 20 AM 0 0 0 0 0 3 Bicyclist Pedestrian Crossing From North From East From North From East From East Bicyclist Wednesday, August 6, 2025 N/A All Motor Vehicles From West From South From West Weekday West Approach From South From South From West Non-Holiday Schools Not in Session No Special Events Start Date: Tuesday, August 5, 2025 Total Number of Hours Counted: 6 Page 107 of 224 Count Basics Page 4 of 13 Hourly Volume Summary - Motor Vehicle Data Main Street & 3rd Street One-Hour Motor Vehicle Data  One-Hour Total Time Period 3rd Street Main Street 3rd Street Main Street Vehicle Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume E/W N/S 6:00 AM 2 0 2 0 4 1 140 9 0 150 5 0 2 0 7 0 293 0 0 293 454 443 11 7:00 AM 4 0 11 0 15 6 249 26 0 281 13 0 0 0 13 8 477 5 0 490 799 771 28 8:00 AM 3 0 5 0 8 9 297 58 0 364 14 0 2 0 16 14 417 2 0 433 821 797 24 9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:00 PM 1 1 4 0 6 11 429 7 0 447 23 0 1 0 24 2 385 4 0 391 868 838 30 4:00 PM 5 0 5 0 10 19 634 9 1 663 77 1 1 0 79 2 448 3 0 453 1205 1116 89 5:00 PM 4 0 3 0 7 10 585 12 0 607 32 0 1 0 33 3 435 6 0 444 1091 1051 40 6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 19 1 30 0 50 56 2334 121 1 2512 164 1 7 0 172 29 2455 20 0 2504 5238 5016 222 Intersection Traffic Volume Report Totals AMMD From North Weekday PM Start Date: Tuesday, August 5, 2025 Total Number of Hours Counted: 6 All Motor Vehicles Schools Not in Session No Special Events From East Volume Totals Non-Holiday DirectionalFrom South From West 0 100 200 300 400 500 600 700 0 200 400 600 800 1000 1200 1400 6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM Entering Vehicle Volume By Approach (Line Chart) Total Entering Vehicle Volume (Bar Chart) One-Hour Time Period Start Time (For example, 6am represents volumes from 6am to 7am) Graphical Summary of Hourly Volumes All Motor Vehicles Southbound Approach Westbound Approach Northbound Approach Eastbound Approach Page 108 of 224 Count Basics Page 5 of 13 15-Minute Motor Vehicle Data Main Street & 3rd Street 15-Minute Motor Vehicle Data  15-Minute Time Period 3rd Street Main Street 3rd Street Main Street 15-Min Hour ly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum PHF 6:00 AM 0 0 1 0 1 0 22 0 0 22 2 0 0 0 2 0 46 0 0 46 71 454 0.78 6:15 AM 0 0 0 0 0 1 41 0 0 42 1 0 0 0 1 0 62 0 0 62 105 542 0.85 6:30 AM 1 0 1 0 2 0 33 4 0 37 0 0 1 0 1 0 92 0 0 92 132 632 0.81 6:45 AM 1 0 0 0 1 0 44 5 0 49 2 0 1 0 3 0 93 0 0 93 146 706 0.86 7:00 AM 2 0 3 0 5 0 45 2 0 47 3 0 0 0 3 0 104 0 0 104 159 799 0.84 7:15 AM 0 0 3 0 3 1 53 7 0 61 3 0 0 0 3 0 127 1 0 128 195 847 0.89 7:30 AM 2 0 2 0 4 3 63 5 0 71 5 0 0 0 5 6 118 2 0 126 206 863 0.90 7:45 AM 0 0 3 0 3 2 88 12 0 102 2 0 0 0 2 2 128 2 0 132 239 857 0.90 8:00 AM 1 0 1 0 2 2 69 13 0 84 2 0 1 0 3 5 111 2 0 118 207 821 0.97 8:15 AM 0 0 1 0 1 3 70 18 0 91 5 0 0 0 5 2 112 0 0 114 211 8:30 AM 2 0 1 0 3 1 84 18 0 103 4 0 1 0 5 5 84 0 0 89 200 8:45 AM 0 0 2 0 2 3 74 9 0 86 3 0 0 0 3 2 110 0 0 112 203 9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:00 PM 0 0 3 0 3 2 104 1 0 107 7 0 1 0 8 1 86 2 0 89 207 868 0.92 3:15 PM 1 0 0 0 1 3 101 3 0 107 4 0 0 0 4 0 103 0 0 103 215 961 0.80 3:30 PM 0 0 1 0 1 3 98 1 0 102 5 0 0 0 5 1 98 2 0 101 209 1047 0.87 3:45 PM 0 1 0 0 1 3 126 2 0 131 7 0 0 0 7 0 98 0 0 98 237 1178 0.87 4:00 PM 1 0 1 0 2 4 163 3 0 170 21 0 1 0 22 1 105 0 0 106 300 1205 0.89 4:15 PM 0 0 1 0 1 3 160 0 1 164 23 1 0 0 24 1 110 1 0 112 301 1213 0.89 4:30 PM 2 0 1 0 3 5 168 2 0 175 24 0 0 0 24 0 138 0 0 138 340 1205 0.89 4:45 PM 2 0 2 0 4 7 143 4 0 154 9 0 0 0 9 0 95 2 0 97 264 1128 0.92 5:00 PM 1 0 0 0 1 2 175 3 0 180 14 0 0 0 14 0 113 0 0 113 308 1091 0.89 5:15 PM 1 0 2 0 3 2 134 3 0 139 6 0 0 0 6 2 142 1 0 145 293 5:30 PM 1 0 1 0 2 3 144 5 0 152 9 0 0 0 9 1 98 1 0 100 263 5:45 PM 1 0 0 0 1 3 132 1 0 136 3 0 1 0 4 0 82 4 0 86 227 6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 19 1 30 0 50 56 2334 121 1 2512 164 1 7 0 172 29 2455 20 0 2504 5238 Peak Hour All Vehicle Volume Summary  Hourly Total Time Period 3rd Street Main Street 3rd Street Main Street Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume PHF AM 7:15 AM 3 0 9 0 12 8 273 37 0 318 12 0 1 0 13 13 484 7 0 504 847 0.89 MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PM 4:15 PM 5 0 4 0 9 17 646 9 1 673 70 1 0 0 71 1 456 3 0 460 1213 0.89 Intersection Traffic Volume Report Midday Peak PeriodPM Peak Period Totals Tuesday, August 5, 2025 Total Number of Hours Counted: 6 All Motor Vehicles AM Peak Period Weekday Schools Not in Session Non-Holiday No Special Events Start Date: From North From East From South From West From North From East From South From West Page 109 of 224 Count Basics Page 6 of 13 15-Minute Automobile Data Main Street & 3rd Street 15-Minute Automobile Data  15-Minute Time Period 3rd Street Main Street 3rd Street Main Street 15-Min Hour ly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum 6:00 AM 0 0 1 0 1 0 21 0 0 21 2 0 0 0 2 0 46 0 0 46 70 438 6:15 AM 0 0 0 0 0 1 40 0 0 41 1 0 0 0 1 0 58 0 0 58 100 519 6:30 AM 0 0 1 0 1 0 31 4 0 35 0 0 1 0 1 0 87 0 0 87 124 604 6:45 AM 1 0 0 0 1 0 43 4 0 47 2 0 1 0 3 0 93 0 0 93 144 676 7:00 AM 2 0 3 0 5 0 41 2 0 43 3 0 0 0 3 0 100 0 0 100 151 762 7:15 AM 0 0 3 0 3 1 51 7 0 59 3 0 0 0 3 0 119 1 0 120 185 808 7:30 AM 2 0 2 0 4 3 57 5 0 65 5 0 0 0 5 6 114 2 0 122 196 827 7:45 AM 0 0 3 0 3 2 82 12 0 96 2 0 0 0 2 2 125 2 0 129 230 827 8:00 AM 1 0 1 0 2 2 65 13 0 80 2 0 0 0 2 5 106 2 0 113 197 792 8:15 AM 0 0 1 0 1 3 65 18 0 86 5 0 0 0 5 2 110 0 0 112 204 8:30 AM 2 0 1 0 3 1 81 18 0 100 4 0 1 0 5 5 83 0 0 88 196 8:45 AM 0 0 2 0 2 3 72 9 0 84 3 0 0 0 3 2 104 0 0 106 195 9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:00 PM 0 0 3 0 3 2 99 1 0 102 7 0 0 0 7 1 84 1 0 86 198 834 3:15 PM 1 0 0 0 1 3 99 3 0 105 4 0 0 0 4 0 98 0 0 98 208 923 3:30 PM 0 0 1 0 1 3 94 1 0 98 5 0 0 0 5 1 97 2 0 100 204 1014 3:45 PM 0 0 0 0 0 3 118 2 0 123 6 0 0 0 6 0 95 0 0 95 224 1147 4:00 PM 1 0 1 0 2 4 153 3 0 160 21 0 1 0 22 1 102 0 0 103 287 1183 4:15 PM 0 0 1 0 1 3 159 0 1 163 23 1 0 0 24 1 109 1 0 111 299 1199 4:30 PM 2 0 1 0 3 5 166 2 0 173 24 0 0 0 24 0 137 0 0 137 337 1191 4:45 PM 2 0 2 0 4 7 141 4 0 152 9 0 0 0 9 0 93 2 0 95 260 1115 5:00 PM 1 0 0 0 1 2 173 3 0 178 14 0 0 0 14 0 110 0 0 110 303 1079 5:15 PM 1 0 2 0 3 2 133 3 0 138 6 0 0 0 6 2 141 1 0 144 291 5:30 PM 1 0 1 0 2 3 142 5 0 150 9 0 0 0 9 1 98 1 0 100 261 5:45 PM 1 0 0 0 1 3 131 1 0 135 3 0 1 0 4 0 80 4 0 84 224 6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 18 0 30 0 48 56 2257 120 1 2434 163 1 5 0 169 29 2389 19 0 2437 5088 Peak Hour Automobile Volume Summary  Hourly Total Time Period 3rd Street Main Street 3rd Street Main Street Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume AM 7:15 AM 3 0 9 0 12 8 255 37 0 300 12 0 0 0 12 13 464 7 0 484 808 MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PM 4:15 PM 5 0 4 0 9 17 639 9 1 666 70 1 0 0 71 1 449 3 0 453 1199 Intersection Traffic Volume Report Tuesday, August 5, 2025 Total Number of Hours Counted: 6 Weekday Schools Not in Session Non-Holiday No Special Events Start Date: Automobiles (Cars, Light Trucks, & Motorcycles) Totals AM Peak PeriodMidday Peak Period From North From East PM Peak Period From North From East From South From West From South From West Page 110 of 224 Count Basics Page 7 of 13 15-Minute Single Unit (SU) Truck & Bus Data Main Street & 3rd Street 15-Minute Single Unit (SU) Truck & Bus Data  15-Minute Time Period 3rd Street Main Street 3rd Street Main Street 15-Min Hour ly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum 6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 6:15 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 2 0 0 2 3 16 6:30 AM 1 0 0 0 1 0 2 0 0 2 0 0 0 0 0 0 5 0 0 5 8 22 6:45 AM 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 1 24 7:00 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 2 0 0 2 4 30 7:15 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 7 0 0 7 9 33 7:30 AM 0 0 0 0 0 0 6 0 0 6 0 0 0 0 0 0 4 0 0 4 10 29 7:45 AM 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 3 0 0 3 7 22 8:00 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 5 0 0 5 7 22 8:15 AM 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 2 0 0 2 5 8:30 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 1 0 0 1 3 8:45 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 5 0 0 5 7 9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:00 PM 0 0 0 0 0 0 4 0 0 4 0 0 1 0 1 0 2 1 0 3 8 26 3:15 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 4 0 0 4 6 29 3:30 PM 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 1 0 0 1 4 25 3:45 PM 0 1 0 0 1 0 4 0 0 4 0 0 0 0 0 0 3 0 0 3 8 23 4:00 PM 0 0 0 0 0 0 9 0 0 9 0 0 0 0 0 0 2 0 0 2 11 17 4:15 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 10 4:30 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 8 4:45 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 8 5:00 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 2 0 0 2 4 8 5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:30 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 2 5:45 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 100 20 5 610 5 70 010 10 5 410 5 51 1 5 SU Truck %age: 5.3% 100.0% 0.0% 0.0% 4.0% 0.0% 2.4% 0.8% 0.0% 2.3% 0.0% 0.0% 14.3% 0.0% 0.6% 0.0% 2.2% 5.0% 0.0% 2.2% 2.2% Peak Hour Single Unit (SU) Truck & Buses Volume Summary  Hourly Total Time Period 3rd Street Main Street 3rd Street Main Street Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume AM 7:15 AM 0 0 0 0 0 0 14 0 0 14 0 0 0 0 0 0 19 0 0 19 33 MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PM 4:15 PM 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 0 5 0 0 5 10 Intersection Traffic Volume Report Tuesday, August 5, 2025 Total Number of Hours Counted: 6 Weekday Schools Not in Session Non-Holiday No Special Events Start Date: Single Unit (SU) Trucks & Buses Totals AM Peak PeriodMidday Peak Period From North From East PM Peak Period From North From East From South From West From South From West Page 111 of 224 Count Basics Page 8 of 13 15-Minute Semi-Truck Data Main Street & 3rd Street 15-Minute Semi-Truck Data  15-Minute Time Period 3rd Street Main Street 3rd Street Main Street 15-Min Hour ly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum 6:00 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 4 6:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 2 7 6:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 6:45 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 6 7:00 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 2 0 0 2 4 7 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 6 7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 7:45 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 2 8 8:00 AM 0 0 0 0 0 0 2 0 0 2 0 0 1 0 1 0 0 0 0 0 3 7 8:15 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 2 8:30 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:00 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 8 3:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 9 3:30 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 8 3:45 PM 0 0 0 0 0 0 4 0 0 4 1 0 0 0 1 0 0 0 0 0 5 8 4:00 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 5 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 4:30 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 6 4:45 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 5 5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 4 5:15 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000 00 2 100 2 11 010 20 1 200 1 2 3 5 Semi Truck %age: 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.9% 0.0% 0.0% 0.8% 0.6% 0.0% 14.3% 0.0% 1.2% 0. 0% 0.5% 0.0% 0.0% 0.5% 0.7% Peak Hour Semi-Truck Volume Summary  Hourly Total Time Period 3rd Street Main Street 3rd Street Main Street Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume AM 7:15 AM 0 0 0 0 0 0 4 0 0 4 0 0 1 0 1 0 1 0 0 1 6 MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PM 4:15 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 2 0 0 2 4 Tuesday, August 5, 2025 Total Number of Hours Counted: 6 Semi-Trucks Weekday Schools Not in Session Non-Holiday No Special Events Start Date: Intersection Traffic Volume Report PM Peak Period Totals AM Peak PeriodMidday Peak Period From North From North From East From South From West From WestFrom East From South Page 112 of 224 Count Basics Page 9 of 13 15-Minute Heavy Vehicle Data Main Street & 3rd Street 15-Minute Heavy Vehicle Data  15-Minute Time Period 3rd Street Main Street 3rd Street Main Street 15-Min Hour ly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum 6:00 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 16 6:15 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 4 0 0 4 5 23 6:30 AM 1 0 0 0 1 0 2 0 0 2 0 0 0 0 0 0 5 0 0 5 8 28 6:45 AM 0 0 0 0 0 0 1 1 0 2 0 0 0 0 0 0 0 0 0 0 2 30 7:00 AM 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 4 0 0 4 8 37 7:15 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 8 0 0 8 10 39 7:30 AM 0 0 0 0 0 0 6 0 0 6 0 0 0 0 0 0 4 0 0 4 10 36 7:45 AM 0 0 0 0 0 0 6 0 0 6 0 0 0 0 0 0 3 0 0 3 9 30 8:00 AM 0 0 0 0 0 0 4 0 0 4 0 0 1 0 1 0 5 0 0 5 10 29 8:15 AM 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 0 2 0 0 2 7 8:30 AM 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 1 0 0 1 4 8:45 AM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 6 0 0 6 8 9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:00 PM 0 0 0 0 0 0 5 0 0 5 0 0 1 0 1 0 2 1 0 3 9 34 3:15 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 5 0 0 5 7 38 3:30 PM 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 1 0 0 1 5 33 3:45 PM 0 1 0 0 1 0 8 0 0 8 1 0 0 0 1 0 3 0 0 3 13 31 4:00 PM 0 0 0 0 0 0 10 0 0 10 0 0 0 0 0 0 3 0 0 3 13 22 4:15 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 14 4:30 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 1 0 0 1 3 14 4:45 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 2 0 0 2 4 13 5:00 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 3 0 0 3 5 12 5:15 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 5:30 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 2 5:45 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 2 0 0 2 3 6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 100 20 7 710 7 81 020 30 6 610 6 71 5 0 Total Truck %age: 5.3% 100.0% 0.0% 0.0% 4.0% 0.0% 3.3% 0.8% 0.0% 3.1% 0.6% 0.0% 28.6% 0.0% 1.7% 0.0% 2.7% 5.0% 0.0% 2.7% 2.9% Peak Hour Heavy Vehicle Volume Summary  Hourly Total Time Period 3rd Street Main Street 3rd Street Main Street Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume AM 7:15 AM 0 0 0 0 0 0 18 0 0 18 0 0 1 0 1 0 20 0 0 20 39 MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PM 4:15 PM 0 0 0 0 0 0 7 0 0 7 0 0 0 0 0 0 7 0 0 7 14 Intersection Traffic Volume Report Tuesday, August 5, 2025 Total Number of Hours Counted: 6 Weekday Schools Not in Session Non-Holiday No Special Events Start Date: Heavy Vehicles (Single-Unit Trucks, Buses & Semi-Trucks) Totals AM Peak PeriodMidday Peak Period From North From East PM Peak Period From North From East From South From West From South From West Page 113 of 224 Count Basics Page 10 of 13 15-Minute Heavy Vehicle Percentages Main Street & 3rd Street 15-Minute Heavy Vehicle Percentages  Total Hourly 15-Minute Heavy Heavy Time Period 3rd Street Main Street 3rd Street Main Street Vehicle Veh icle Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Percent Percent 6:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 4.5 0.0 0.0 4.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 1.4 3.5 6:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 2.4 0.0 0.0 2.4 0.0 0.0 0.0 0.0 0.0 0.0 6.5 0.0 0. 0 6.5 4.8 4.2 6:30 AM 100.0 0.0 0.0 0.0 50.0 0.0 6.1 0.0 0.0 5.4 0.0 0.0 0.0 0.0 0.0 0.0 5.4 0. 0 0.0 5.4 6.1 4.4 6:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 2.3 20.0 0.0 4.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 1.4 4.2 7:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 8.9 0.0 0.0 8.5 0.0 0.0 0.0 0.0 0.0 0.0 3.8 0.0 0. 0 3.8 5.0 4.6 7:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 3.8 0.0 0.0 3.3 0.0 0.0 0.0 0.0 0.0 0.0 6.3 0.0 0. 0 6.3 5.1 4.6 7:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 9.5 0.0 0.0 8.5 0.0 0.0 0.0 0.0 0.0 0.0 3.4 0.0 0. 0 3.2 4.9 4.2 7:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 6.8 0.0 0.0 5.9 0.0 0.0 0.0 0.0 0.0 0.0 2.3 0.0 0. 0 2.3 3.8 3.5 8:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 5.8 0.0 0.0 4.8 0.0 0.0 100.0 0.0 33.3 0.0 4.5 0. 0 0.0 4.2 4.8 3.5 8:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 7.1 0.0 0.0 5.5 0.0 0.0 0.0 0.0 0.0 0.0 1.8 0.0 0. 0 1.8 3.3 8:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 3.6 0.0 0.0 2.9 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0 0. 0 1.1 2.0 8:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 2.7 0.0 0.0 2.3 0.0 0.0 0.0 0.0 0.0 0.0 5.5 0.0 0. 0 5.4 3.9 9:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 9:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 9:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 9:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 10:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 10:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 10:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 10:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 11:00 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 11:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 11:30 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 11:45 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 12:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 12:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 12:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 12:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 1:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 1:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 1:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 1:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 2:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 2:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 2:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 2:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 3:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 4.8 0.0 0.0 4.7 0.0 0.0 100.0 0.0 12.5 0.0 2.3 50 .0 0.0 3.4 4.3 3.9 3:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 2.0 0.0 0.0 1.9 0.0 0.0 0.0 0.0 0.0 0.0 4.9 0.0 0. 0 4.9 3.3 4.0 3:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 4.1 0.0 0.0 3.9 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0. 0 1.0 2.4 3.2 3:45 PM 0.0 100.0 0.0 0.0 100.0 0.0 6.3 0.0 0.0 6.1 14.3 0.0 0.0 0.0 14.3 0.0 3. 1 0.0 0.0 3.1 5.5 2.6 4:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 6.1 0.0 0.0 5.9 0.0 0.0 0.0 0.0 0.0 0.0 2.9 0.0 0. 0 2.8 4.3 1.8 4:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.9 0.0 0. 0 0.9 0.7 1.2 4:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0 0.0 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0 0. 0 0.7 0.9 1.2 4:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 1.4 0.0 0.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0 0. 0 2.1 1.5 1.2 5:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 1.1 0.0 0.0 1.1 0.0 0.0 0.0 0.0 0.0 0.0 2.7 0.0 0. 0 2.7 1.6 1.1 5:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0 0. 0 0.7 0.7 5:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 1.4 0.0 0.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.8 5:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 2.4 0.0 0. 0 2.3 1.3 6:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 6:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 6:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 6:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 7:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 7:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 7:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 7:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 8:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 8:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 8:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 8:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 9:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 9:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 9:30 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 9:45 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0 0.0 0.0 5.3 100.0 0.0 0.0 4.0 0.0 3.3 0.8 0.0 3.1 0.6 0.0 28.6 0.0 1.7 0.0 2.7 5.0 0.0 2.7 2.9 Semi Truck Percentage: 0.6682 Peak Hour Heavy Vehicle Percentages Summary  Hourly Hourly Heavy Time Period 3rd Street Main Street 3rd Street Main Street Vehicle Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Percent AM 7:15 AM 0.0 0.0 0.0 0.0 0.0 0.0 6.6 0.0 0.0 5.7 0.0 0.0 100.0 0.0 7.7 0.0 4.1 0.0 0.0 4.0 4.6 MD 12:00 PM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 PM 4:15 PM 0.0 0.0 0.0 0.0 0.0 0.0 1.1 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 1.5 0.0 0. 0 1.5 1.2 % Weekday Schools Not in Session Non-Holiday Heavy Vehicles (Single-Unit Trucks, Buses & Semi-Trucks) No Special Events PM Peak Period Totals AM Peak PeriodMidday Peak Period From North Intersection Traffic Volume Report Start Date: Tuesday, August 5, 2025 Total Number of Hours Counted: 6 From North From East From South From West From South From WestFrom East Page 114 of 224 Page 11 of 13 15-Minute Pedestrian and Bicyclist Data Main Street & 3rd Street 15-Minute Pedestrian and Bicyclist Data 15-Minute Time Period 3rd Street Main Street 3rd Street Main Street 15-Min Hour ly Start Time Total Total Total Total Totals Sum 6:00 AM 1030 4 1 5 6:15 AM 0030 3 1 3 6:30 AM 1012 4 1 7 6:45 AM 0040 4 1 5 7:00 AM 0011 2 1 4 7:15 AM 2041 7 1 6 7:30 AM 0011 2 1 4 7:45 AM 0012 3 2 2 8:00 AM 1021 4 1 9 8:15 AM 1022 5 8:30 AM 2053 1 0 8:45 AM 0000 0 9:00 AM 0000 0 9:15 AM 0000 0 9:30 AM 0000 0 9:45 AM 0000 0 10:00 AM 0000 0 10:15 AM 0000 0 10:30 AM 0000 0 10:45 AM 0000 0 11:00 AM 0000 0 11:15 AM 0000 0 11:30 AM 0000 0 11:45 AM 0000 0 12:00 PM 0000 0 12:15 PM 0000 0 12:30 PM 0000 0 12:45 PM 0000 0 1:00 PM 0000 0 1:15 PM 0000 0 1:30 PM 0000 0 1:45 PM 0000 0 2:00 PM 0000 0 2:15 PM 0000 0 2:30 PM 0000 0 2:45 PM 0000 0 3:00 PM 10 1 4 6 21 64 3:15 PM 10 0 5 6 21 56 3:30 PM 2123 8 4 3 3:45 PM 2057 1 4 3 5 4:00 PM 5143 1 3 2 6 4:15 PM 2006 8 1 7 4:30 PM 0000 0 1 0 4:45 PM 1013 5 2 2 5:00 PM 1012 4 2 5 5:15 PM 0010 1 5:30 PM 4170 1 2 5:45 PM 2042 8 6:00 PM 0000 0 6:15 PM 0000 0 6:30 PM 0000 0 6:45 PM 0000 0 7:00 PM 0000 0 7:15 PM 0000 0 7:30 PM 0000 0 7:45 PM 0000 0 8:00 PM 0000 0 8:15 PM 0000 0 8:30 PM 0000 0 8:45 PM 0000 0 9:00 PM 0000 0 9:15 PM 0000 0 9:30 PM 0000 0 9:45 PM 0000 0 47 4 61 51 163 Special Pedestrians Pedestrian Type Other (None) Intersection Traffic Volume Report 1 00 00 1 10 Weekday Schools Not in Session Non-Holiday No Special Events Totals 47 0 1 None Pre-school Children Elementry School Age Children Visually Impaired (white cane/help e 48 3 Pedestrian Bicyclist 00 61 0 3 0 1 or 2 A Few Several Many Elderly/Disabled (except wheelchai Wheelchairs/Electric Scooters x x x x x x 0 0 10 0 00 5 00 00 0 00 00 0 1 00 00 0 Pedestrian Bicyclist 30 00 20 0 0 30 10 0 040 Midday Peak Period 0 1 0 0 0 0 0 0 00 00 0 0 0 00 0 0 2 Bicyclist 0 0 0 0 AM Peak Period 0 Crossing 00 0 0 00 0 0 Pedestrian Bicyclist Pedestrian 10 0 0 0 0 00 0 1 00 00 0 01 02 20 00 40 0 10 2010 00 00 02 01 2 000 00 1 00 00 0 02 0 00 000 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 0 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 1 0 00 14 06 0 00 00 00 60 20 01 20 21 1 0 00 05 0 70 50 10 40 30 20 00 50 11 10 00 10 0 00 00 00 00 20 00 00 00 10 00 01 0 0 40 01 70 00 00 00 00 00 00 00 00 00 00 00 00 2 00 00 00 00 00 00 00 00 0 00 00 00 PM Peak Period 00 0 0 0 0 00 0 20 00 40 00 North Approach East Approach South Approach 00 000 00 00 00 00 00 00 0 Crossing 0 00 00 00 0 00 00 00 000 Crossing Crossing 0 00 00 00 0 0 00 00 00 00 00 00 00 00 00 Tuesday, August 5, 2025 Total Number of Hours Counted: 6 Start Date: Count Basics Unknown West Approach 00 Pedestrians and Bicyclists 00 00 00 30 6 Page 115 of 224 Page 12 of 13 15-Minute Adult & Children Count (Manual Entry) Main Street & 3rd Street 15-Minute Adult & Children Pedestrian Data 15-Minute Time Period 3rd Street Main Street 3rd Street Main Street 15-Min Hour ly Start Time Total Total Total Total Totals Sum 12:00 AM 0000 0 0 12:15 AM 0000 0 0 12:30 AM 0000 0 0 12:45 AM 0000 0 0 1:00 AM 0000 0 0 1:15 AM 0000 0 0 1:30 AM 0000 0 0 1:45 AM 0000 0 0 2:00 AM 0000 0 0 2:15 AM 0000 0 0 2:30 AM 0000 0 0 2:45 AM 0000 0 0 3:00 AM 0000 0 0 3:15 AM 0000 0 0 3:30 AM 0000 0 0 3:45 AM 0000 0 0 4:00 AM 0000 0 0 4:15 AM 0000 0 0 4:30 AM 0000 0 0 4:45 AM 0000 0 0 5:00 AM 0000 0 0 5:15 AM 0000 0 4 5:30 AM 0000 0 7 5:45 AM 0000 0 1 1 6:00 AM 1030 4 1 5 6:15 AM 0030 3 1 3 6:30 AM 1012 4 1 7 6:45 AM 0040 4 1 5 7:00 AM 0011 2 1 4 7:15 AM 2041 7 1 6 7:30 AM 0011 2 1 4 7:45 AM 0012 3 2 1 8:00 AM 1021 4 1 8 8:15 AM 1022 5 1 4 8:30 AM 2052 9 9 8:45 AM 0000 0 0 9:00 AM 0000 0 0 9:15 AM 0000 0 0 9:30 AM 0000 0 0 9:45 AM 0000 0 0 10:00 AM 0000 0 0 10:15 AM 0000 0 0 10:30 AM 0000 0 0 10:45 AM 0000 0 0 11:00 AM 0000 0 0 11:15 AM 0000 0 0 11:30 AM 0000 0 0 11:45 AM 0000 0 0 12:00 PM 0000 0 0 12:15 PM 0000 0 0 12:30 PM 0000 0 0 12:45 PM 0000 0 0 1:00 PM 0000 0 0 1:15 PM 0000 0 0 1:30 PM 0000 0 0 1:45 PM 0000 0 0 2:00 PM 0000 0 0 2:15 PM 0000 0 2 0 2:30 PM 0000 0 4 1 2:45 PM 0000 0 4 7 3:00 PM 10 0 4 6 20 61 3:15 PM 10 0 5 6 21 54 3:30 PM 2022 6 4 1 3:45 PM 2057 1 4 3 5 4:00 PM 5143 1 3 2 6 4:15 PM 2006 8 1 6 4:30 PM 0000 0 9 4:45 PM 1013 5 2 0 5:00 PM 1011 3 2 3 5:15 PM 0010 1 2 0 5:30 PM 4070 1 1 1 9 5:45 PM 2042 8 8 6:00 PM 0000 0 0 6:15 PM 0000 0 0 6:30 PM 0000 0 0 6:45 PM 0000 0 0 7:00 PM 0000 0 0 7:15 PM 0000 0 0 7:30 PM 0000 0 0 7:45 PM 0000 0 0 8:00 PM 0000 0 0 8:15 PM 0000 0 0 8:30 PM 0000 0 0 8:45 PM 0000 0 0 9:00 PM 0000 0 0 9:15 PM 0000 0 0 9:30 PM 0000 0 0 9:45 PM 0000 0 0 10:00 PM 0000 0 0 10:15 PM 0000 0 0 10:30 PM 0000 0 0 10:45 PM 0000 0 0 11:00 PM 0000 0 0 11:15 PM 0000 0 11:30 PM 0000 0 11:45 PM 0000 0 47 1 61 48 157 Intersection Traffic Volume Report 0000 0000 Post PM Peak Period 000 0000 0000 0000 0 0000 0000 0000 0 0 0 0 0 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 000 0000 0000 000 0000 AM Peak Period Pre-AM Peak Period 0000 0000 0000 0 0 0 0 0 1 0 00 0 0 0 00 00 0 0 0 0 04 8 0Totals 47 0 1 0 61 0 0000 000 0 0000 000 0 0000 000 0 0000 000 0 0000 000 0 0000 000 0 0000 000 0 0000 000 0 2042 407 1 0010 101 0 1013 000 3 2006 514 6 2 2057 202 0 00 1 0 046 0 0000 PM Peak Period 000 00 000 10 0 5 0 0000 000 0 0000 000 0 0000 000 0 0000 000 0 0000 000 0 Midday Peak Period 0 0000 000 0 0 0 0000 000 2 0000 205 1 1022 102 1 0012 001 1 2041 001 40 101 Crossing North Approach East Approach South Approach West Approach 2 000 0 3 30 0 Count Basics Start Date: Tuesday, August 5, 2025 Weekday Schools Not in Session Total Number of Hours Counted: 6 Non-Holiday No Special Events Adults Children Adults Children Adults Children Adults Children Adults & Children Crossing Crossing Crossing Page 116 of 224 Count Basics Page 13 of 1 3 15-Minute Bicycle Turning Movement Count (Manual Entry) Main Street & 3rd Street 15-Minute Bicycle Data  15-Minute Time Period 3rd Street Main Street 3rd Street Main Street 15-Min Hour ly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum 12:00 AM 0000 0 0 12:15 AM 0000 0 0 12:30 AM 0000 0 0 12:45 AM 0000 0 0 1:00 AM 0000 0 0 1:15 AM 0000 0 0 1:30 AM 0000 0 0 1:45 AM 0000 0 0 2:00 AM 0000 0 0 2:15 AM 0000 0 0 2:30 AM 0000 0 0 2:45 AM 0000 0 0 3:00 AM 0000 0 0 3:15 AM 0000 0 0 3:30 AM 0000 0 0 3:45 AM 0000 0 0 4:00 AM 0000 0 0 4:15 AM 0000 0 0 4:30 AM 0000 0 0 4:45 AM 0000 0 0 5:00 AM 0000 0 0 5:15 AM 0000 0 0 5:30 AM 0000 0 0 5:45 AM 0000 0 0 6:00 AM 0000 0 0 6:15 AM 0000 0 0 6:30 AM 0000 0 0 6:45 AM 0000 0 0 7:00 AM 0000 0 0 7:15 AM 0000 0 0 7:30 AM 0000 0 0 7:45 AM 0000 0 0 8:00 AM 0000 0 0 8:15 AM 0000 0 0 8:30 AM 0000 0 0 8:45 AM 0000 0 0 9:00 AM 0000 0 0 9:15 AM 0000 0 0 9:30 AM 0000 0 0 9:45 AM 0000 0 0 10:00 AM 0000 0 0 10:15 AM 0000 0 0 10:30 AM 0000 0 0 10:45 AM 0000 0 0 11:00 AM 0000 0 0 11:15 AM 0000 0 0 11:30 AM 0000 0 0 11:45 AM 0000 0 0 12:00 PM 0000 0 0 12:15 PM 0000 0 0 12:30 PM 0000 0 0 12:45 PM 0000 0 0 1:00 PM 0000 0 0 1:15 PM 0000 0 0 1:30 PM 0000 0 0 1:45 PM 0000 0 0 2:00 PM 0000 0 0 2:15 PM 0000 0 0 2:30 PM 0000 0 0 2:45 PM 0000 0 0 3:00 PM 0000 0 0 3:15 PM 0000 0 0 3:30 PM 0000 0 0 3:45 PM 0000 0 0 4:00 PM 0000 0 0 4:15 PM 0000 0 0 4:30 PM 0000 0 0 4:45 PM 0000 0 0 5:00 PM 0000 0 0 5:15 PM 0000 0 0 5:30 PM 0000 0 0 5:45 PM 0000 0 0 6:00 PM 0000 0 0 6:15 PM 0000 0 0 6:30 PM 0000 0 0 6:45 PM 0000 0 0 7:00 PM 0000 0 0 7:15 PM 0000 0 0 7:30 PM 0000 0 0 7:45 PM 0000 0 0 8:00 PM 0000 0 0 8:15 PM 0000 0 0 8:30 PM 0000 0 0 8:45 PM 0000 0 0 9:00 PM 0000 0 0 9:15 PM 0000 0 0 9:30 PM 0000 0 0 9:45 PM 0000 0 0 10:00 PM 0000 0 0 10:15 PM 0000 0 0 10:30 PM 0000 0 0 10:45 PM 0000 0 0 11:00 PM 0000 0 0 11:15 PM 0000 0 11:30 PM 0000 0 11:45 PM 0000 0 0 000 00 000 00 000 00 000 0 0 Peak Hour Bicycle Turning Movement Volume Summary  Hourly Total Time Period 3rd Street Main Street 3rd Street Main Street Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume AM 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PM 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Pre-AM Peak Period Start Date: Tuesday, August 5, 2025 Weekday From East From South From West Intersection Traffic Volume Report Schools Not in Session Total Number of Hours Counted: 6 Non-Holiday No Special Events Midday Peak Period Bicyclists From North Post PM Peak Period AM Peak PeriodPM Peak Period Totals From North From East From South From West Page 117 of 224 Count Basics Special Report 15-Minute Motor Vehicle Data (Daily & Seasonally Adjusted) Main Street & 3rd Street 15-Minute Motor Vehicle Data  15-Minute Time Period 3rd Street Main Street 3rd Street Main Street 15-Min Hour ly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Totals Sum PHF 12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:00 AM 0 0 1 0 1 0 19 0 0 19 2 0 0 0 2 0 40 0 0 40 62 400 0.78 6:15 AM 0 0 0 0 0 1 36 0 0 37 1 0 0 0 1 0 54 0 0 54 92 478 0.85 6:30 AM 1 0 1 0 2 0 29 4 0 33 0 0 1 0 1 0 81 0 0 81 117 558 0.81 6:45 AM 1 0 0 0 1 0 39 4 0 43 2 0 1 0 3 0 82 0 0 82 129 622 0.86 7:00 AM 2 0 3 0 5 0 39 2 0 41 3 0 0 0 3 0 91 0 0 91 140 704 0.83 7:15 AM 0 0 3 0 3 1 47 6 0 54 3 0 0 0 3 0 111 1 0 112 172 746 0.88 7:30 AM 2 0 2 0 4 3 55 4 0 62 4 0 0 0 4 5 104 2 0 111 181 759 0.90 7:45 AM 0 0 3 0 3 2 77 11 0 90 2 0 0 0 2 2 112 2 0 116 211 755 0.89 8:00 AM 1 0 1 0 2 2 61 11 0 74 2 0 1 0 3 4 97 2 0 103 182 724 0.98 8:15 AM 0 0 1 0 1 3 61 16 0 80 4 0 0 0 4 2 98 0 0 100 185 8:30 AM 2 0 1 0 3 1 74 16 0 91 4 0 1 0 5 4 74 0 0 78 177 8:45 AM 0 0 2 0 2 3 65 8 0 76 3 0 0 0 3 2 97 0 0 99 180 9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:00 PM 0 0 3 0 3 2 91 1 0 94 6 0 1 0 7 1 75 2 0 78 182 765 0.92 3:15 PM 1 0 0 0 1 3 89 3 0 95 4 0 0 0 4 0 90 0 0 90 190 847 0.80 3:30 PM 0 0 1 0 1 3 86 1 0 90 4 0 0 0 4 1 86 2 0 89 184 922 0.87 3:45 PM 0 1 0 0 1 3 111 2 0 116 6 0 0 0 6 0 86 0 0 86 209 1036 0.87 4:00 PM 1 0 1 0 2 4 143 3 0 150 18 0 1 0 19 1 92 0 0 93 264 1059 0.89 4:15 PM 0 0 1 0 1 3 140 0 1 144 20 1 0 0 21 1 97 1 0 99 265 1066 0.89 4:30 PM 2 0 1 0 3 4 147 2 0 153 21 0 0 0 21 0 121 0 0 121 298 1060 0.89 4:45 PM 2 0 2 0 4 6 125 4 0 135 8 0 0 0 8 0 83 2 0 85 232 993 0.92 5:00 PM 1 0 0 0 1 2 154 3 0 159 12 0 0 0 12 0 99 0 0 99 271 962 0.89 5:15 PM 1 0 2 0 3 2 118 3 0 123 5 0 0 0 5 2 125 1 0 128 259 5:30 PM 1 0 1 0 2 3 126 4 0 133 8 0 0 0 8 1 86 1 0 88 231 5:45 PM 1 0 0 0 1 3 116 1 0 120 3 0 1 0 4 0 72 4 0 76 201 6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 19 1 30 0 50 54 2048 109 1 2212 145 1 7 0 153 26 2153 20 0 2199 4614 Peak Hour All Vehicle Volume Summary  Hourly Total Time Period 3rd Street Main Street 3rd Street Main Street Hourly Start Time Right Thru Left U-Tn Total Right Thru Left U-Tn Total Rig ht Thru Left U-Tn Total Right Thru Left U-Tn Total Volume PHF AM 7:15 AM 3 0 9 0 12 8 240 32 0 280 11 0 1 0 12 11 424 7 0 442 746 0.88 MD 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PM 4:15 PM 5 0 4 0 9 15 566 9 1 591 61 1 0 0 62 1 400 3 0 404 1066 0.89PM Peak Period Totals Post PM Peak Period Midday Peak Period From North AM Peak Period Pre-AM Peak Period All Motor Vehicles From North From East From South From West From East Intersection Traffic Volume Report Schools Not in Session Total Number of Hours Counted: 6 Non-Holiday No Special Events Start Date: Tuesday, August 5, 2025 Weekday From South From West Page 118 of 224 Total Volume (Hourly) Alley btwn 2nd and 3rd (43.009097, -89.737856) Started: 8/5/2025 10:00 Ended: 8/7/2025 9:00 --- --- --- --- --- --- --- --- Total --- --- Total --- --- Total --- --- --- --- --- --- --- --- Total 00:00 --- 0 0-- 00:00 00:00-00:59 0 01:00 --- 0 0-- 01:00 01:00-01:59 0 02:00 --- 0 0-- 02:00 02:00-02:59 0 03:00 --- 0 0-- 03:00 03:00-03:59 0 04:00 --- 0 0-- 04:00 04:00-04:59 0 05:00 --- 0 0-- 05:00 05:00-05:59 0 06:00 --- 1 0-- 06:00 06:00-06:59 1 07:00 --- 3 2-- 07:00 07:00-07:59 3 08:00 --- 3 5-- 08:00 08:00-08:59 4 09:00 --- 7 6-- 09:00 09:00-09:59 7 10:00 -- 4 2--- 10:00 10:00-10:59 3 11:00 -- 2 2--- 11:00 11:00-11:59 2 12:00 -- 9 4--- 12:00 12:00-12:59 7 13:00 -- 1 4 4--- 13:00 13:00-13:59 9 14:00 -- 8 6--- 14:00 14:00-14:59 7 15:00 -- 3 7--- 15:00 15:00-15:59 5 16:00 -- 7 8--- 16:00 16:00-16:59 8 17:00 -- 8 6--- 17:00 17:00-17:59 7 18:00 -- 3 8--- 18:00 18:00-18:59 6 19:00 -- 3 2--- 19:00 19:00-19:59 3 20:00 -- 1 2--- 20:00 20:00-20:59 2 21:00 -- 2 0--- 21:00 21:00-21:59 1 22:00 -- 0 0--- 22:00 22:00-22:59 0 23:00 -- 1 0--- 23:00 23:00-23:59 1 Daily Total - - - -- - -- 65 -- 65 -- 13 -- - -- - Daily Total - - 72 AM Peak --- 7 7-- AM Peak 7 HV% --- -- HV% Hour - - - 08:45 08:30 - - Hour 08:45 MD Peak -- 1 4 5--- MD Peak 9 HV% -- 1 4 % --- HV% 17% Hour - - 13:00 12:30 - - - Hour 13:00 PM Peak -- 8 9--- PM Peak 9 HV% -- --- HV% Hour - - 14:00 16:15 - - - Hour 16:15 Wed 0.947 Daily/Seasonal Factor Thurs 0.918 (1) Non-Interstate Low ruck % Fri 0.92 62 60 12 Weekday ADT 72 Adjusted 67 Location Description: Hour Mon-Thurs AverageHour --- --- Tue 8/5/25 Wed 8/6/25 Thu 8/7/25 --- --- Page 119 of 224 Main Street Residential/Mixed-Use Development – Mt Horeb, Wisconsin Appendix B Trip Generation Comparison Page 120 of 224 3516: 8-14-25 N NOT TO SCALE APPENDIX B TRIP GENERATION COMPARISON TABLE MT HOREB, WISCONSIN In Out Total In Out Total 220 5 25 30 20 5 25 (3.44) (23%) (77%) (0.44) (71%) (29%) (0.36) Not 5 10 15 5 5 10 Available (23%) (77%) (0.22) (71%) (29%) (0.17) 0 15 15 15 0 15 Appendix Trip Generation Comparison Table1 Land Use ITE Code Proposed Size Weekday Daily AM Peak PM Peak Low-Rise Residential with Ground-Floor Commercial (2-3 Floors) (1-25k) 230 65 Units Mid-Rise Residential with Ground-Floor Commercial (4-10 Floors) (1-25k) 231 65 Units Difference 1ITE Trip Rates (X.XX) and/or Fitted Curve Equations (FCE) are from the ITE Trip Generation Manual, 11th Edition. Page 121 of 224 Main Street Residential/Mixed-Use Development – Mt Horeb, Wisconsin Appendix C Gap Analysis Page 122 of 224 Gap Analysis Calculations Main Street & 3rd Street Look Up Tables Calculated Values Inputs Major Street Tc,HV Tf,HV Tc,HV Tf,HV 2 lanes 1.0 0.9 1.0 0.9 4 lanes 2.0 1.0 Grade Adjust. Tc,G G Minor RT 0.1 0.0 Minor LT/TH 0.2 Gap Acceptance Tc,t Tc,t Calculations 1 stage 0.0 0.0 Tc,x Tf,x 1 Veh 2 Veh 3 Veh Tc,x Tf,x 1 Veh 2 Veh 3 Veh 2 stage 1.0 4.2 2.3 4.2 10.6 17.0 4.1 2.2 4.1 10.5 16.8 6.3 3.4 6.3 15.9 25.5 6.2 3.3 6.2 15.8 25.3 Geometry T3,lt T3,lt 6.6 4.1 6.6 17.2 27.8 6.5 4.0 6.5 17.1 27.6 3-leg 0.7 0.0 7.2 3.6 7.2 17.9 28.6 7.1 3.5 7.1 17.8 28.4 4-leg 0.0 Equations HCM Exhibit 17-5 Base follow-up Tc,x = Tc,base + Tc,HVPHV + Tc,GG - Tc,T - T3,LT Vehicle Movement 2-Ln Major 4-Ln Major Tf,base (s) Tc,base Tf,base Tc,G Tf,x = Tf,base + Tf,HVPHV LT from Major 4.1 4.1 2.2 4.1 2.2 0.0 RT from Minor 6.2 6.9 3.3 6.2 3.3 0.1 Definitions TH on Minor 6.5 6.5 4.0 6.5 4.0 0.2 Tc,x Critical gap for movement LT from Minor 7.1 7.5 3.5 7.1 3.5 0.2 Tc,base base critical gap (Exhibit 17-5) Tc,HV HV adjustment factor (1.0 2-ln, 2.0 4-ln) for major street PHV PHV proportion of heavy vehicles for minor movement AM 0.06 Tc,G grade adjustment factor (0.1 mvmts 9 & 12, 0.2 mvmts 7, 8, 10, & 11) PM 0.02 G percent grade divided by 100 Tc,T 2-stage gap acceptance adjustment factor (1.0 for 1st or 2nd stage, 0.0 for only 1 stage) T3,LT intersection geometry adjsutment factor (0.7 minor street left turn at 3-leg intersection, 0.0 otherwise) Tf,x minor movement follow-up time Tf,base base follow-up time from exhibit 17-5 Tf,HV heavy vehicle adjustment factor (0.9 for 2-ln major, 1.0 for 4-ln major) PHV proportion of heavy vehicles for minor movement Lanes on Major St. (both dir.) 2 lanes %HV on Minor Street (AM) 6.0% %HV on Minor Street (PM) 2.0% Grade 0.0% Gap Acceptance 1 stage Legs at Intersection 4 leg Left Turn from Minor Base Critical Gap Tc,base (s) AM PM Left turn from major Right Turn from Minor Through Traffic on Minor Page 123 of 224 Start Time 2 - 3 4 - 5 6 - 7 8 - 9 10 - 11 12 - 13 14 - 15 16 - 17 18 - 19 20 - 21 22 - 23 24 - 25 26 - 27 28 - 29 >29 7:15 AM 842132213231009 7:30 AM 10 35422362322115 7:45 AM 15 78564140013222 8:00 AM 728341143110018 Total 40 16 23 13 15 9 7 15 867634 2 4 Start Time 2 - 3 4 - 5 6 - 7 8 - 9 10 - 11 12 - 13 14 - 15 16 - 17 18 - 19 20 - 21 22 - 23 24 - 25 26 - 27 28 - 29 >29 7:15 AM 6 10 4864433112200 7:30 AM 13 11 7455231211211 7:45 AM 12 18 9826310020111 8:00 AM 16 87453543101012 Total 47 47 27 24 18 18 14 11 7444534 Start Time 2 - 3 4 - 5 6 - 7 8 - 9 10 - 11 12 - 13 14 - 15 16 - 17 18 - 19 20 - 21 22 - 23 24 - 25 26 - 27 28 - 29 >29 7:15 AM 16 11 8865311101200 7:30 AM 31 13 8245133001000 7:45 AM 31 16 9822200010000 8:00 AM 21 8 6 11 51521000001 Total 99 48 31 29 17 13 11 65112201 Gap Calcs Gaps Gaps 1 Veh (x1) 6.3 15.8 63 6.3 15.8 96 2 Veh (x2) 15.9 25.4 82 15.9 25.4 60 3 Veh (x3) 25.5 & up 98 25.5 & up 40 243 196 Westbound Gap Eastbound Gap Gap Calcs Gaps 1 Veh (x1) 7.2 17.8 78 2 Veh (x2) 17.9 28.5 24 3 Veh (x3) 28.6 & up 3 105 Combined Gap Gap Calcs Gaps Gaps 1 Veh (x1) 4.2 10.5 54 4.2 10.5 98 2 Veh (x2) 10.6 16.9 68 10.6 16.9 101 3 Veh (x3) 17.0 & up 199 17.0 & up 111 321 310 Westbound Gap Eastbound Gap Main Street & 3rd Street Traffic Gaps NB & SB LT from Minor Gap Times Equivalent Gaps EB LT from Major WB LT from Major Gap Times Gap Times Equivalent Gaps Weekday AM 8/6/2025 - Wednesday Westbound Gaps Eastbound Gaps Combined Gaps SB RT from Minor NB RT from Minor Gap Times Gap Times Equivalent Gaps Page 124 of 224 Start Time 2 - 3 4 - 5 6 - 7 8 - 9 10 - 11 12 - 13 14 - 15 16 - 17 18 - 19 20 - 21 22 - 23 24 - 25 26 - 27 28 - 29 >29 4:15 PM 40 96542200131000 4:30 PM 29 13 3561320100011 4:45 PM 31 10 10 853333001010 5:00 PM 43 13 10 654221000010 Total 143 45 29 24 20 10 10 74232031 Start Time 2 - 3 4 - 5 6 - 7 8 - 9 10 - 11 12 - 13 14 - 15 16 - 17 18 - 19 20 - 21 22 - 23 24 - 25 26 - 27 28 - 29 >29 4:15 PM 11 23 5941442220310 4:30 PM 13 11 12 558200300311 4:45 PM 10 15 4973142200204 5:00 PM 7 10 4883623300211 Total 41 59 25 31 24 15 13 10 7 10 2 0 10 3 6 Start Time 2 - 3 4 - 5 6 - 7 8 - 9 10 - 11 12 - 13 14 - 15 16 - 17 18 - 19 20 - 21 22 - 23 24 - 25 26 - 27 28 - 29 >29 4:15 PM 50 18 9540000000000 4:30 PM 37 12 5334000000000 4:45 PM 41 15 10 834200001000 5:00 PM 49 19 9523000000000 Total 177 64 33 21 12 11 200001000 Gap Calcs Gaps Gaps 1 Veh (x1) 6.2 15.7 89 6.2 15.7 104 2 Veh (x2) 15.8 25.2 37 15.8 25.2 62 3 Veh (x3) 25.3 & up 14 25.3 & up 57 140 222 Westbound Gap Eastbound Gap Gap Calcs Gaps 1 Veh (x1) 7.1 17.7 49 2 Veh (x2) 17.8 28.3 2 3 Veh (x3) 28.4 & up 0 51 Combined Gap Gap Calcs Gaps Gaps 1 Veh (x1) 4.1 10.4 100 4.1 10.4 117 2 Veh (x2) 10.5 16.7 77 10.5 16.7 101 3 Veh (x3) 16.8 & up 59 16.8 & up 134 235 352 Westbound Gap Eastbound Gap Main Street & 3rd Street Traffic Gaps EB LT from Major WB LT from Major Gap Times Gap Times Eastbound Gaps Combined Gaps SB RT from Minor Weekday PM 8/5/2025 - Tuesday Westbound Gaps NB RT from Minor Equivalent Gaps Gap TimesGap Times Equivalent Gaps NB & SB LT from Minor Gap Times Equivalent Gaps Page 125 of 224 Main Street Residential/Mixed-Use Development – Mt Horeb, Wisconsin Appendix D Peak Hour Analysis Outputs Existing Traffic Full Build (Scenario 1- Two-way) Traffic Full Build (Scenario 2 – One-way Westbound) Traffic Page 126 of 224 Lanes, Volumes, Timings AM Peak 100: 2nd Street & Alley 08/14/2025 TADI Synchro 12 Report Existing AM Peak Hour Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T r a f f i c V o l u m e ( v p h ) 15 1 5511 1 0 1 551 3 01 F u t u r e V o l u m e ( v p h ) 15 1 5511 1 0 1 551 3 01 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.901 0.983 0.979 0.997 Flt Protected 0.998 0.964 0.983 0.999 Satd. Flow (prot) 0 1692 0 0 1783 0 0 1810 0 0 1874 0 Flt Permitted 0.998 0.964 0.983 0.999 Satd. Flow (perm) 0 1692 0 0 1783 0 0 1810 0 0 1874 0 Link Speed (mph) 25 25 25 25 Link Distance (ft) 289 200 228 207 Travel Time (s) 7.9 5.5 6.2 5.6 C o n f l . P e d s . ( # / h r )41 14 32 23 C o n f l . B i k e s ( # / h r ) 1111 Peak Hour Factor 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 H e a v y V e h i c l e s ( % ) 1 %1 %1 %1 %1 %1 %1 %1 %1 %1 %1 %1 % A d j . F l o w ( v p h ) 16 1 9611 1 3 1 961 3 81 Shared Lane Traffic (%) Lane Group Flow (vph) 0 2 600800 3 800 4 00 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Sign Control Stop Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 18.1% ICU Level of Service A Analysis Period (min) 15 Page 127 of 224 HCM 7th TWSC AM Peak 100: 2nd Street & Alley 08/14/2025 TADI Synchro 12 Report Existing AM Peak Hour Page 2 Intersection Int Delay, s/veh 3.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 1 5 15 5 1 1 10 15 5 1 30 1 Future Vol, veh/h 1 5 15 5 1 1 10 15 5 1 30 1 C o n f l i c t i n g P e d s , # / h r 401104302203 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - ----------- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 78 78 78 78 78 78 78 78 78 78 78 78 H e a v y V e h i c l e s , % 111111111111 M v m t F l o w 16 1 9611 1 3 1 961 3 81 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 94 98 43 95 95 28 43 0 0 28 0 0 Stage 1 45 45 - 50 50 ------- Stage 2 50 53 - 45 45 ------- Critical Hdwy 7.11 6.51 6.21 7.11 6.51 6.21 4.11 - - 4.11 - - C r i t i c a l H d w y S t g 1 6 . 1 1 5 . 5 1- 6 . 1 1 5 . 5 1------- C r i t i c a l H d w y S t g 2 6 . 1 1 5 . 5 1- 6 . 1 1 5 . 5 1------- Follow-up Hdwy 3.509 4.009 3.309 3.509 4.009 3.309 2.209 - - 2.209 - - Pot Cap-1 Maneuver 891 794 1030 890 797 1049 1573 - - 1593 - - Stage 1 972 860 - 966 855 ------- Stage 2 966 852 - 971 859 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 875 783 1026 856 786 1043 1568 - - 1589 - - Mov Cap-2 Maneuver 875 783 - 856 786 ------- Stage 1 968 857 - 956 846 ------- Stage 2 952 844 - 944 856 ------- Approach EB WB NB SB HCM Ctrl Dly, s/v 8.91 9.2 2.44 0.23 HCM LOS A A Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 571 - - 948 867 56 - - HCM Lane V/C Ratio 0.008 - - 0.028 0.01 0.001 - - HCM Ctrl Dly (s/v) 7.3 0 - 8.9 9.2 7.3 0 - HCM Lane LOS A A - AAAA - HCM 95th %tile Q(veh) 0 - - 0.1 0 0 - - Page 128 of 224 Lanes, Volumes, Timings AM Peak 200: 2nd Street & Main Street 08/14/2025 TADI Synchro 12 Report Existing AM Peak Hour Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 10 400 20 30 230 15 20 5 65 40 1 10 Future Volume (vph) 10 400 20 30 230 15 20 5 65 40 1 10 Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor 1.00 1.00 0.98 0.99 Frt 0.994 0.992 0.903 0.973 Flt Protected 0.999 0.995 0.989 0.962 Satd. Flow (prot) 0 1607 0 0 1583 0 0 1505 0 0 1598 0 Flt Permitted 0.992 0.930 0.908 0.745 Satd. Flow (perm) 0 1596 0 0 1479 0 0 1381 0 0 1235 0 R i g h t T u r n o n R e d N oN oN oN o Satd. Flow (RTOR) Link Speed (mph) 25 25 25 25 Link Distance (ft) 375 420 242 228 Travel Time (s) 10.2 11.5 6.6 6.2 C o n f l . P e d s . ( # / h r )19 91 32 23 C o n f l . B i k e s ( # / h r ) 1211 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 H e a v y V e h i c l e s ( % ) 8 %8 %8 %9 %9 %9 %2 %2 %2 %2 %2 %2 % Adj. Flow (vph) 11 444 22 33 256 17 22 6 72 44 1 11 Shared Lane Traffic (%) Lane Group Flow (vph) 0 477 0 0 306 0 0 100 0 0 56 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 1 2 1 2 1 2 Detector Template Left Thru Left Thru Left Thru Left Thru Leading Detector (ft) 20 100 20 100 20 100 20 100 Trailing Detector (ft) 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 20 6 20 6 20 6 20 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 94 Detector 2 Size(ft) 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 6 2 8 4 Page 129 of 224 Lanes, Volumes, Timings AM Peak 200: 2nd Street & Main Street 08/14/2025 TADI Synchro 12 Report Existing AM Peak Hour Page 4 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR P e r m i t t e d P h a s e s 6284 Detector Phase 6 6 2 2 8 8 4 4 Switch Phase Minimum Initial (s) 12.0 12.0 12.0 12.0 7.0 7.0 7.0 7.0 Minimum Split (s) 17.5 17.5 17.0 17.0 12.5 12.5 12.5 12.5 Total Split (s) 50.0 50.0 50.0 50.0 30.5 30.5 30.5 30.5 Total Split (%) 62.1% 62.1% 62.1% 62.1% 37.9% 37.9% 37.9% 37.9% Maximum Green (s) 44.5 44.5 45.0 45.0 25.0 25.0 25.0 25.0 Yellow Time (s) 4.0 4.0 3.5 3.5 4.0 4.0 4.0 4.0 All-Red Time (s) 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.5 5.0 5.5 5.5 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 4.0 4.0 4.0 4.0 2.0 2.0 2.0 2.0 Minimum Gap (s) 2.5 2.5 2.5 2.5 3.0 3.0 3.0 3.0 Time Before Reduce (s) 20.0 20.0 20.0 20.0 0.0 0.0 0.0 0.0 Time To Reduce (s) 10.0 10.0 10.0 10.0 0.0 0.0 0.0 0.0 Recall Mode C-Min C-Min C-Min C-Min None None None None Act Effct Green (s) 62.7 63.1 10.4 10.4 Actuated g/C Ratio 0.78 0.78 0.13 0.13 v/c Ratio 0.38 0.26 0.56 0.35 Control Delay (s/veh) 5.3 4.4 44.5 37.0 Queue Delay 0.0 0.0 0.0 0.0 Total Delay (s/veh) 5.3 4.4 44.5 37.0 LOS A A D D Approach Delay (s/veh) 5.3 4.4 44.5 37.0 Approach LOS A A D D Intersection Summary Area Type: Other Cycle Length: 80.5 Actuated Cycle Length: 80.5 Offset: 22.5 (28%), Referenced to phase 2:WBTL and 6:EBTL, Start of Green Natural Cycle: 40 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.56 Intersection Signal Delay (s/veh): 11.1 Intersection LOS: B Intersection Capacity Utilization 48.7% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 200: 2nd Street & Main Street Page 130 of 224 Queues AM Peak 200: 2nd Street & Main Street 08/14/2025 TADI Synchro 12 Report Existing AM Peak Hour Page 5 Lane Group EBT WBT NBT SBT Lane Group Flow (vph) 477 306 100 56 v/c Ratio 0.38 0.26 0.56 0.35 Control Delay (s/veh) 5.3 4.4 44.5 37.0 Queue Delay 0.0 0.0 0.0 0.0 Total Delay (s/veh) 5.3 4.4 44.5 37.0 Queue Length 50th (ft) 71 39 48 26 Queue Length 95th (ft) 150 87 91 57 Internal Link Dist (ft) 295 340 162 148 Turn Bay Length (ft) Base Capacity (vph) 1243 1159 428 383 Starvation Cap Reductn 0000 Spillback Cap Reductn 0000 Storage Cap Reductn 0000 Reduced v/c Ratio 0.38 0.26 0.23 0.15 Intersection Summary Page 131 of 224 HCM 7th Signalized Intersection Summary AM Peak 200: 2nd Street & Main Street 08/14/2025 TADI Synchro 12 Report Existing AM Peak Hour Page 6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 10 400 20 30 230 15 20 5 65 40 1 10 Future Volume (veh/h) 10 400 20 30 230 15 20 5 65 40 1 10 I n i t i a l Q ( Q b ) , v e h 000000000000 Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 0.99 0.96 0.99 0.96 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1641 1641 1641 1627 1627 1627 1723 1723 1723 1723 1723 1723 Adj Flow Rate, veh/h 11 444 22 33 256 17 22 6 72 44 1 11 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 P e r c e n t H e a v y V e h , % 888999222222 Cap, veh/h 55 1181 58 139 997 64 74 17 96 170 11 25 Arrive On Green 0.77 0.77 0.77 0.77 0.77 0.77 0.09 0.09 0.09 0.09 0.09 0.09 Sat Flow, veh/h 12 1530 75 116 1292 83 217 187 1039 982 119 269 Grp Volume(v), veh/h 477 0 0 306 0 0 100 0 0 56 0 0 Grp Sat Flow(s),veh/h/ln 1616 0 0 1491 0 0 1444 0 0 1369 0 0 Q Serve(g_s), s 0.0 0.0 0.0 0.0 0.0 0.0 2.4 0.0 0.0 0.0 0.0 0.0 Cycle Q Clear(g_c), s 7.7 0.0 0.0 4.3 0.0 0.0 5.4 0.0 0.0 3.0 0.0 0.0 Prop In Lane 0.02 0.05 0.11 0.06 0.22 0.72 0.79 0.20 Lane Grp Cap(c), veh/h 1293 0 0 1200 0 0 187 0 0 206 0 0 V/C Ratio(X) 0.37 0.00 0.00 0.26 0.00 0.00 0.53 0.00 0.00 0.27 0.00 0.00 Avail Cap(c_a), veh/h 1293 0 0 1200 0 0 487 0 0 475 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 3.0 0.0 0.0 2.6 0.0 0.0 35.8 0.0 0.0 34.7 0.0 0.0 Incr Delay (d2), s/veh 0.8 0.0 0.0 0.5 0.0 0.0 0.9 0.0 0.0 0.3 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(95%),veh/ln 3.5 0.0 0.0 2.0 0.0 0.0 3.5 0.0 0.0 1.9 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 3.8 0.0 0.0 3.1 0.0 0.0 36.7 0.0 0.0 34.9 0.0 0.0 LnGrp LOS A A D C Approach Vol, veh/h 477 306 100 56 Approach Delay, s/veh 3.8 3.1 36.7 34.9 Approach LOS A A D C Timer - Assigned Phs 2 4 6 8 Phs Duration (G+Y+Rc), s 68.0 13.0 68.0 13.0 Change Period (Y+Rc), s * 5.5 5.5 5.5 5.5 Max Green Setting (Gmax), s * 45 25.0 44.5 25.0 Max Q Clear Time (g_c+I1), s 6.3 5.0 9.7 7.4 Green Ext Time (p_c), s 3.3 0.1 5.3 0.3 Intersection Summary HCM 7th Control Delay, s/veh 8.9 HCM 7th LOS A Notes * HCM 7th computational engine requires equal clearance times for the phases crossing the barrier. Page 132 of 224 Lanes, Volumes, Timings AM Peak 300: 3rd Street & Main Street 08/14/2025 TADI Synchro 12 Report Existing AM Peak Hour Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 5 485 15 35 270 10 1 1 10 10 1 5 Future Volume (vph) 5 485 15 35 270 10 1 1 10 10 1 5 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.996 0.996 0.886 0.955 Flt Protected 0.999 0.995 0.996 0.970 Satd. Flow (prot) 0 1818 0 0 1776 0 0 1552 0 0 1743 0 Flt Permitted 0.999 0.995 0.996 0.970 Satd. Flow (perm) 0 1818 0 0 1776 0 0 1552 0 0 1743 0 Link Speed (mph) 25 25 25 25 Link Distance (ft) 420 521 251 130 Travel Time (s) 11.5 14.2 6.8 3.5 C o n f l . P e d s . ( # / h r )38 83 51 15 C o n f l . B i k e s ( # / h r ) 1111 Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 H e a v y V e h i c l e s ( % ) 4 %4 %4 %6 %6 %6 %8 %8 %8 %1 %1 %1 % Adj. Flow (vph) 6 545 17 39 303 11 1 1 11 11 1 6 Shared Lane Traffic (%) Lane Group Flow (vph) 0 568 0 0 353 0 0 13 0 0 18 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Sign Control Free Free Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 50.3% ICU Level of Service A Analysis Period (min) 15 Page 133 of 224 HCM 7th TWSC AM Peak 300: 3rd Street & Main Street 08/14/2025 TADI Synchro 12 Report Existing AM Peak Hour Page 8 Intersection Int Delay, s/veh 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 5 485 15 35 270 10 1 1 10 10 1 5 Future Vol, veh/h 5 485 15 35 270 10 1 1 10 10 1 5 C o n f l i c t i n g P e d s , # / h r 308803501105 Sign Control Free Free Free Free Free

Text truncated. Open the original for the full document.

Source: Village of Mount Horeb website. First collected Nov 2, 2026.