BUILDING BOARD MEETING
Monday, November 2, 2026
Virtual Meeting Phone/Video
4:00 P.M.
PLEASE TAKE NOTICE that a meeting of the Brown Deer Building Board will be held virtually.
The public can access this meeting of the Building Board by dialing 1-312-626-6799. The public
would then need to enter the code: 869 8573 1944 to join the meeting. The public can also join by
video using the following link https://us02web.zoom.us/j/86985731944
Please remember to mute your microphone to reduce background noise. The following items of
business will be discussed and possibly acted upon:
I Roll Call
II Persons Desiring to be Heard
III Consideration of Minutes: August 17, 2026
IV Old Business
V Plans Submitted for Consideration:
1. Proposed Addition – Residential Property – 9306 N. 52nd Street
2. New Carwash Building – Jilly’s Carwash – 4200 N. Deerwood Drive
3. Exterior Commercial Building Improvements – North Shore Commerce Center – 9091 N.
Deerwood Drive and 9050-9088 N. Deerbrook Trail
VI Adjournment
Caren Brustmann
Caren Brustmann, Village Clerk
October 29, 2026
PERSONS REQUIRING SPECIAL ACCOMMODATIONS FOR ATTENDANCE AT THE
MEETING SHOULD CONTACT THE VILLAGE CLERK AT LEAST ONE BUSINESS DAY
PRIOR TO THE MEETING.
MINUTES OF THE
BROWN DEER BUILDING BOARD
Virtual Meeting Phone/Video
August 17, 2026
The meeting was called to order at 4:00 p.m.
I ROLL CALL
Present: Mary Buckley, Will Manley, Chris Eger, Nicole Robbins, Ryan Thacker
Excused: None
Also Present: Nate Piotrowski, Community Development Director; Drew Goeke, Lingle Design;
Shannon Staples, Staples Express Carwash
II PERSONS DESIRING TO BE HEARD
None
III CONSIDERATION OF MINUTES
Mr. Manley motioned, and Ms. Robbins seconded to approve the minutes of July 20, 2026.
Approval was unanimous.
IV OLD BUSINESS
1. None
V PLANS SUBMITTED FOR CONSIDERATION
The following items were on the agenda for review:
1. Resubmittal - New Restaurant, Chipotle - 9046 N Green Bay Road
Mr. Piotrowski reviewed the resubmittal and introduced Drew Goeke from Lingle Design, the
architect for the project. Mr. Goeke presented the proposed revisions to the design, stated the
screening was added to hide the rooftop mechanicals, and the roof ladder was internalized so it was
no longer outside or visible.
Mr. Goeke proposed more brick to wrap around the side and back of the building. Mr. Goeke
proposed using the same black ribbed paneling that was on the front of the building on the back of
the building as well as the southside pickup window to reduce the thin brick.
Mr. Eger stated that he appreciated the changes to the NE corner and found the redesign to be an
improvement. Mr. Manley added that all the additional information and design changes addressed
his previous concerns and questions. Mr. Thacker also agreed tha t the revisions and added details
were satisfactory.
Mr. Manley motioned for approval of the resubmittal of plans and Mr. Thacker seconded. Motion
to approve the resubmittal was unanimous.
2. Sign Package and Building Color – Staples Express Carwash – 8300 N
Teutonia Avenue
M
r. Piotrowski reviewed the proposal and introduced Shannon Staples of Staples Express Carwash.
Ms. Staples was not aware these changes needed approval and permit prior to making these
changes. Ms. Buckley asked if the signs meet code, Mr. Piotrowski stated they do meet code and
asked if the board was ok with the aesthetic and if any changes were needed.
Ms. Robbins stated she was ok with the signage, colors on the building were muted enough and
not distracting to drivers, appreciated the updated sign and building color.
Mr
. Manley stated he agreed and liked the fact that the new signs match the other buildings in the
area. Mr. Manley stated it was an upgrade from what was there. Mr. Eger stated it was an upgrade,
not a fan of the red but stated it was done tastefully and he was ok with it.
Ms.
Buckley stated she liked the black paint color of the building and thought it was an upgrade.
Ms
. Robbins motioned for approval of the sign and building color and Mr. Eger seconded.
Motion to approve sign and building color was unanimous.
3. Sign Package, 7 Brew – 4380 W Brown Deer Road
M
r. Piotrowski introduced sign package for 7 Brew , who did not attend the meeting. Mr.
Piotrowski stated 7 Brew wanted the name on two sides of the building and their logo on the front
of the building facing Brown Deer Road , along with arrows directing you into and out of the
driveway. Mr. Piotrowski stated there were no changes from the initial plan, and it was exactly
what they presented with the building and no changes.
M
r. Manley stated that the signage looked fine to him.
Mr.
Eger motioned for approval of the signage and Mr. Thacker seconded. Motion to approve
signage was unanimous.
V
I ADJOURNMENT
Mr. Eger moved adjournment and Ms. Robbins seconded.
Approval was unanimous.
The meeting adjourned at 4:18 p.m.
The next regularly scheduled meeting is September 21, 2026
Jennifer Schlidt
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Administrative Assistant, Village of Brown Deer
ANDERSON/JENSARCHITECTURAL REVIEW SUBMISSION-10/27/299306 N 52nd St, Brown Deer WI 53223GARAGE ADDITION & RENOVATION
EXISTING HOUSENEW GARAGEEXISTING SHEDNEW ROOF OVER SCREEN PORCH10' - 0" 30' - 0"30' - 0"10' - 0"30' - 0"EXISTING HOUSEEXISTING GARAGEEXISTING SHEDNEW DRIVEWAY
DATE: NOT FOR CONSTRUCTION10/28/26ANDERSON/JENS -GARAGE ADDITION & RENOVATIONAD-001 9306 N 52nd St, Brown Deer WI 53223Scale:1/32" = 1'-0" 1PROPOSED SITE PLANScale:1/32" = 1'-0" 2EXISTING SITE PLAN
PROPOSED ADDITION LOCATIONEXT GARAGEEXT DININGEXT LAUNDRYEXT KITCHENEXT SITTING AREAEXT LIVING ROOMEXT BEDROOM 1EXT BEDROOM 2EXT BEDROOM 3EXT BATHEXT PWRD
DATE: NOT FOR CONSTRUCTION10/28/26ANDERSON/JENS -GARAGE ADDITION & RENOVATIONAD-002 9306 N 52nd St, Brown Deer WI 53223Scale:1/8" = 1'-0" NEW WORK - FLOOR PLAN
24' - 8"32' - 0"
2' - 6"10' - 0"2' - 0"10' - 0"2' - 6"16' - 3 1/2"11' - 11 1/2"DININGEXT LAUNDRYEXT KITCHENWICBEDROOM 4EXT BEDROOM 1EXT BEDROOM 2EXT BEDROOM 3EXT BATHGARAGELIVING ROOM17' - 2"MUDROOMENTRYNEW BATH4' - 11"3' - 6"SCREEN PORCH4' - 0"COAT CLOSETBENCH & CUBBIESCOAT CLOSETRECESSED HEADER ABOVE6' - 5"BENCH & CUBBIES9' - 8"10' - 2"STORAGEEXISTING HEADER ABOVE7' - 0"
AD-3011
AD-3002 AD-3012
AD-3001AD-3003 NEW WORK PLAN LEGENDEXISTING, TO REMAINNEW STUD PARTITION
DATE: NOT FOR CONSTRUCTION10/28/26ANDERSON/JENS -GARAGE ADDITION & RENOVATIONAD-100 9306 N 52nd St, Brown Deer WI 53223Scale:1/8" = 1'-0" PROPOSED FLOOR PLAN
NEW PORTION OF ROOF OVER EXISTING ROOF FOR NEW SUNROOMFOOTPRINT OF EXISTING HOUSE
EXISTING CHIMNEY TO BE REMOVED
DATE: NOT FOR CONSTRUCTION10/28/26ANDERSON/JENS -GARAGE ADDITION & RENOVATIONAD-101 9306 N 52nd St, Brown Deer WI 53223Scale:1/8" = 1'-0" PROPOSED ROOF PLANScale:1/16" = 1'-0" EXISTING ROOF PLAN
DATE: NOT FOR CONSTRUCTION10/28/26ANDERSON/JENS -GARAGE ADDITION & RENOVATIONAD-200 9306 N 52nd St, Brown Deer WI 53223Scale:AXON VIEW 1
DATE: NOT FOR CONSTRUCTION10/28/26ANDERSON/JENS -GARAGE ADDITION & RENOVATIONAD-201 9306 N 52nd St, Brown Deer WI 53223
Scale:AXON VIEW 2
DATE: NOT FOR CONSTRUCTION10/28/26ANDERSON/JENS -GARAGE ADDITION & RENOVATIONAD-202 9306 N 52nd St, Brown Deer WI 53223
Scale:AXON VIEW 3
DATE: NOT FOR CONSTRUCTION10/28/26ANDERSON/JENS -GARAGE ADDITION & RENOVATIONAD-203 9306 N 52nd St, Brown Deer WI 53223Scale:VIEW OF APPROACH TO NEW FRONT DOOR
NEW FRONT DOOR @ EXISTING BRICK WINGWALL
GARAGE ADDITION32' - 7"EXISTING HOUSE25' - 1"SALVAGED WINDOW IN EXISTING WALLSCREEN PORCH ADDITION23' - 8"NEW ROOF OVER EXISTING7' - 0 1/2"10X7 OVERHEAD DOOR - WHITE 10X7 OVERHEAD DOOR - WHITENEW METAL LAP SIDING @ ADDITION, TYPICALEXISTING BRICK TO REMAIN
NEW METAL ROOF SHINGLES, TYPICAL
SCREEN PANELS WITH WHITE TRIM
NEW WHITE ALUM FASCIA & GUTTER, TYPICALEXISTING WALL4' - 7"NEW ADDITION48' - 0"
GARAGE ADDITION25' - 9 1/2"
13' - 8"36" SERVICE DOOR -WHITENEW WINDOWS TO MATCH STYLE AND COLOR OF EXISTING HOME, TYPICALAD-3003 SCONCE LIGHT @ NEW FRONT DOOR
DATE: NOT FOR CONSTRUCTION10/28/26ANDERSON/JENS -GARAGE ADDITION & RENOVATIONAD-300 9306 N 52nd St, Brown Deer WI 53223
Scale:3/16" = 1'-0" NORTHWEST ELEVATION
Scale:3/16" = 1'-0" NORTHEAST ELEVATIONScale:3/16" = 1'-0" ENTRY ELEVATION
ADDITION32' - 7"EXISTING HOUSE50' - 3"NEW ROOF OVER EXISTING14' - 11 1/2"
13' - 8"NEW WINDOWS TO MATCH STYLE AND COLOR OF EXISTING HOME, TYPICAL
NEW ADDITION48' - 0"
NEW PORTION OF ROOF OVER EXISTING ROOFSCREEN PORCH ADDITION8' - 6 1/2"
13' - 5"
14' - 11 1/2"
NEW ROOF OVER EXISTINGEXISTING HOUSE52' - 2"
DATE: NOT FOR CONSTRUCTION10/28/26ANDERSON/JENS -GARAGE ADDITION & RENOVATIONAD-301 9306 N 52nd St, Brown Deer WI 53223
Scale:3/16" = 1'-0" SOUTHEAST ELEVATION
Scale:3/16" = 1'-0" SOUTHWEST ELEVATION
DATE: NOT FOR CONSTRUCTION10/28/26ANDERSON/JENS -GARAGE ADDITION & RENOVATIONAD-302 9306 N 52nd St, Brown Deer WI 53223
ROOF SHINGLENEW SIDINGNEW EXTERIOR SCONCE
NOTE:
ALL MECHANICAL, ELECTRICAL,
PLUMBING AND FIRE SPRINKLER
ENGINEERTING BY DESIGN -BUILD
CONTRACTORS
SECONDARY S-1 (MODERATE HAZARD STORAGE)
PRIMARY
TYPE 5B
NONE
1
1
15,576 SF
(+64 SF FOR BOOTH)
15,045 SF
(+35 SF FOR BOOTH)
OCCUPANCY :
CLASS OF CONSTRUCTION :
SPRINKLER SYSTEM :
FLOOR LEVELS :
NUMBER OF STORIES
BUILDING FOOTPRINT :
PLAN COMMISSION SET
OCTOBER 02, 2026
PROJECT INFORMATION:OWNER :
PROPOSED ADDITION FOR:
CAR WASH
4200 WEST BROWN DEER ROAD
BROWN DEER, WISCONSIN 53209
PROJECT LOCATION:
VIEW LOOKING SOUTHEAST
BUILDING AREA :
B OFFICE/BUSINESS)
PD ZONING: PLANNED DEVELOPEMENT
STREET: SETBACKS : X'
1
PARKING:
HANDICAPPED STALLS
SIDE: X'
REAR: X'
5 STANDARD STALLS
6 TOTAL STALLS
BUILDING CODE:
2021 INTERNATIONAL BUILDING CODE WITH WISCONSIN AMENDMENTS SPS 362
2021 INTERNATIONAL EXISTING BUILDING CODE WITH WISCONSIN AMENDMENTS SPS 366
ACCESSIBILITY CODE:
2021 INTERNATIONAL BUILDING CODE WITH WISCONSIN AMENDMENTS SPS 362
2017 ICC/ANSI A117.1 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES
ENERGY CODE:
2021 IECC INTERNATIONAL ENERGY CONSERVATION CODE WITH WISCONSIN AMENDMENTS SPS 363
MECHANICAL CODE:
2021 INTERNATIONAL MECHANICAL CODE WITH WISCONSIN AMENDMENTS SPS 364
PLUMBING CODE:
2023 WISCONSIN PLUMBING CODE SPS 381 -387
ELECTRICAL CODE:
2017 NFPA 70 NATIONAL ELECTRICAL CODE WITH WISCONSIN AMENDMENTS SPS316
FIRE CODE:
SPS 314 FIRE PREVENTION
BMW KAR WASH INC.
TODD GESUND
28845 TELEGRAPH ROAD
SOUTHFIELD, MICHIGAN 48034
(248) 514-5565 PHONE
Todd@JaxKarWash.net
BRIOHN DESIGN GROUP LLC
CIVIL ENGINEER:
RIZAL W. ISKANDARSJACH, P.E., P.L.S.
LANDC02
(414) 622-0103 PHONE
LANDSCAPE DESIGNER:
P.O. BOX 12043
MILWAUKEE, WISCONSIN 53212
HEATHER GROGAN, PLA
3885 N. BROOKFIELD RD., SUITE 200
BROOKFIELD, WISCONSIN 53045
(262) 790-0500 PHONE
riz@briohn.com
BRIOHN BUILDING CORPORATION
KYLE ROADT
3885 N. BROOKFIELD RD., SUITE 200
BROOKFIELD, WISCONSIN 53045
(262) 790-0500 PHONE
kroadt@briohn.com
BRIOHN DESIGN GROUP LLC
CHRISTOPHER WENZLER, AIA, NCARB, LEED AP BD+C
3885 N. BROOKFIELD RD., SUITE 200
BROOKFIELD, WISCONSIN 53045
(262) 790-0500 PHONE
cwenzler@briohn.com
BRIOHN DESIGN GROUP LLC
KEVIN JANKOWSKI, PE
GENERAL CONTRACTOR : ARCHITECT : STRUCTURAL ENGINEER:
3885 N. BROOKFIELD RD., SUITE 200
BROOKFIELD, WISCONSIN 53045
(262) 790-0500 PHONE
kjankowski@briohn.com
CHRIS CLINE, PE
ccline@briohn.com
heather@landc02.com
DATE:
SHEET:
CHECKED:
JOB:
DRAWN:
SHEET TITLE
3885 N BROOKFIELD ROAD, SUITE 200
BROOKFIELD WISCONSIN 53045-1950
(262) 790-0500 PHONE
(262) 790-0505 FAX
DESIGN GROUP
B R I O H N
APPLICABLE
TO ALL
PLAN VIEWS
PROGRESS SET
NOT FOR CONSTRUCTION
T1.0
JILLY'S TITLE SHEETJILLY'S
CAR WASH
BROWN DEER, WI
NEW BUILDING FOR:
2026-10-02
CW/CJR
CW
240158
PC SHEET INDEX
Sheet Number Sheet Name
0-GENERAL
T1.0 JILLY'S TITLE SHEET
1-CIVIL
C1.0 SITE DIMENSIONS AND PAVEMENT ID PLAN
C1.1 CAR STACKING/QUEUING EXHIBIT
C2.0 SITE GRADING PLAN
C2.1 SITE EROSION CONTROL PLAN
C3.0 SITE UTILITY PLAN
C4.0 SITE NOTES AND DETAILS
C4.1 SITE NOTES AND DETAILS
2-LANDSCAPING
L1.0 LANDSCAPE PLAN
L2.0 LANDSCAPE NOTES, DETAILS AND PLANT SCHEDULE
4-ARCHITECTURAL
A1.1 OVERALL FLOOR PLAN
A1.2 CLERESTORY PLAN
A4.1 ROOF PLAN
A5.1 EXTERIOR ELEVATIONS
A5.2 EXTERIOR RENDERINGS
7-ELECTRICAL
EL1 EXTERIOR LIGHTING AND PHOTOMETRIC PLAN
Date Revision
PARCEL A
PARCEL B
C1.1
CAR STACKING/QUEUING
EXHIBIT
DATE:
SHEET:
CHECKED:
DRAWN:
SHEET TITLE
3885 N BROOKFIELD ROAD, SUITE 200
BROOKFIELD WISCONSIN 53045-1950
(262) 790-0500 PHONE
(262) 790-0505 FAX
DESIGN GROUP
B R I O H N
10-14-2026
JOB:260084
PROPOSED IMPROVEMENTS FOR:
JILLY'S CARWASH
N. DEERWOOD DR.
VILLAGE OF BROWN DEER, WISCONSIN
Date Revision
DRAFT - NOT FOR CONSTRUCTION
FIRST FLOOR
100' - 0"
T.O. LOW WALL
116' - 8"
D AB
106' - 6"
9' - 0"
07-15
05-2
C
22' - 0" 21' - 10" 48' - 8" 14' - 0"
08-2 26-1 08-2 26-107-504-1
04-2
07-3
07-4
04-1
08-1
08-1
04-2
04-526-1 26-1104-508-2
08-2
120' - 0 1/32"
08-532-4 08-5
122' - 3 1/8"
FIRST FLOOR
100' - 0"
T.O. LOW WALL
116' - 8"
5431
05-2
10' - 0"43' - 4"43' - 4"34' - 4"
08-2
2 6
4' - 0"19' - 0"10' - 0"14' - 0"81' - 4"34' - 8"
9' - 0"
08-2
08-1
08-2
08-2
04-1 08-2 26-1 08-2 26-1
08-1 07-1521-7
08-226-11 04-107-3
07-307-4 07-3 08-1 32-4 04-2
07-5
07-5
04-504-504-504-5
7
07-3 07-3
FIRST FLOOR
100' - 0"
T.O. LOW WALL
116' - 8"
D
05-2
A B
106' - 6"
61' - 8 3/8" 11 5/8" 25' - 10" 18' - 0"
9' - 0"
C
62' - 8" 21' - 10" 22' - 0"
26-1
26-1
08-5 08-2
08-2
08-1
08-1
08-1 04-1
26-11
08-208-2
26-107-5 04-1
04-207-4
07-407-5
04-2
07-4
04-2
07-4
07-15
04-504-5 07-308-2
08-5
120' - 0 1/32"
122' - 3 1/8"
FIRST FLOOR
100' - 0"
T.O. LOW WALL
116' - 8"
5 4 3 1
10' - 0" 43' - 4" 43' - 4" 43' - 4"
26
34' - 4" 9' - 0"
26-1 26-1 26-1 08-2
05-2
9' - 0"
04-1
26-1
04-107-4 07-3 07-4 07-3
04-104-107-3 07-3
08-2 08-2 08-2 08-2 08-2 08-1
04-504-5
7
EXTERIOR MATERIALS LEGEND
INSULATED CONCRETE MASONRY UNITS
(COLOR: 'XXXXXX' )
MODULAR METAL PANEL (COLOR: 'XXXXXX')
VERTICAL METAL PANEL (COLOR: WOOD
LOOK)
HORIZONTAL METAL PANEL (COLOR:
'XXXXX' )
DATE:
SHEET:
CHECKED:
JOB:
DRAWN:
SHEET TITLE
3885 N BROOKFIELD ROAD, SUITE 200
BROOKFIELD WISCONSIN 53045-1950
(262) 790-0500 PHONE
(262) 790-0505 FAX
DESIGN GROUP
B R I O H N
PROGRESS SET
NOT FOR CONSTRUCTION
A5.1
EXTERIOR ELEVATIONSJILLY'S
CAR WASH
BROWN DEER, WI
NEW BUILDING FOR:
2026-10-02
CW
CW/CJR
240158
1/8" = 1'-0"3 SOUTH ELEVATION.
1/8" = 1'-0"4 WEST ELEVATION
1/8" = 1'-0"2 NORTH ELEVATION.
1/8" = 1'-0"1 EAST ELEVATION
Date Revision
KEYNOTE LEGEND
VALUE FLOOR PLAN CODED NOTES
04-1 INSULATED CONCRETE MASONRY UNITS - COLOR 1 (WHITE)
04-2 INSULATED CONCRETE MASONRY UNITS - COLOR 2 (LIGHT GREY)
04-5 4" WIDE REVEAL
05-2 PREFINISHED METAL TRIM FINISHED ON STEEL FRAMING CANOPY WITH
DOWNLIGHTING
07-3 VERTICAL METAL WALL PANEL SYSTEM, 'WOOD' FINISH, COLOR:
07-4 MODULAR METALL WALL PANEL SYSTEM, COLOR:
07-5 HORIZONTAL METAL WALL PANEL SYSTEM, COLOR:
07-15 PROVIDE PRE-FINISHED METAL DOWNSPOUT. COLOR AND FINISH TO MATCH
CANOPY FINISH. LOCATION SHOWN FOR REFERENCE ONLY - ROUTE DOWNSPOUT
ALONG BUILDING FACE AS REQ.
08-1 ALUMINUM STOREFRONT ENTRY SYSTEM
08-2 ALUMINUM STOREFRONT
08-5 INSULATED OH DOOR, FACTORY FINISHED SECTIONAL DOOR WITH 6" DIAMETER X
4'-0" TALL CONCRETE FILLED STEEL PIPE BOLLARD(S) EA. SIDE OF DOOR, PAINTED. SEE
DOOR LEGEND AND SCHEDULE.
21-7 FIRE DEPARTMENT CONNECTION AND ALARM AS REQUIRED BY LOCAL GOVERNING
MUNICIPALITY - REFER FLOOR PLAN.
26-1 EXTERIOR LIGHT FIXTURE - CUT-OFF LED WALLPACK - SEE LIGHTING PLAN FOR FIXTURE
TYPE AND MOUNTING HEIGHT
26-11 BACKLIT BUILDING SIGNAGE (BY OWNER), PROVIDE UTILITIES TO LOCATION.
32-4 6" DIAMETER X 4'-0" TALL CONCRETE FILLED STEEL PIPE BOLLARD(S), PAINTED SAFETY
YELLOW
DATE:
SHEET:
CHECKED:
JOB:
DRAWN:
SHEET TITLE
3885 N BROOKFIELD ROAD, SUITE 200
BROOKFIELD WISCONSIN 53045-1950
(262) 790-0500 PHONE
(262) 790-0505 FAX
DESIGN GROUP
B R I O H N
PROGRESS SET
NOT FOR CONSTRUCTION
A5.2
EXTERIOR RENDERINGSJILLY'S
CAR WASH
BROWN DEER, WI
NEW BUILDING FOR:
2026-10-02
CW
CW
240158
Date Revision
3D VIEW LOOKING NORTHEAST FROM SOUTHWEST
3D VIEW LOOKING SOUTHWEST FROM NORTHEAST 3 D VIEW LOOKING SOUTHEAST FROM NORTHWEST
3D VIEW LOOKING NORTHWEST FROM SOUTHEAST
VILLAGE OF BROWN DEER · BUILDING BOARD · PLANS SUBMITTED FOR CONSIDERATION
North Shore Commerce Center
Building 1 · 9091 N. Deerwood Dr., Brown Deer, WI 53223 Building 2 (FKA Building 4) · 9050-9088 N. Deerbrook Trail, Brown Deer, WI 53223
Rear overhead door modifications, header facade & signage - Buildings 1 & 2
Proposed: Building 2 rear (left) and Building 1 rear (right), photo mockups from the 2026 Matterport scans.
SUBMITTAL
Building Board review (PPR) + Building Permits (2) + Sign
Permits (2)
OWNER
IC Holdings 5A, LLC c/o Newlane Management LLC
APPLICANT
Newlane Management LLC · Tom McCrossin · 414-322-4717
ARCHITECT
Patera Architecture + Engineering · Brookfield, WI ·
262-786-6776
CONTRACTOR
Newlane Management LLC
ZONING
Business Planned Development District · Brown Deer Business
Park Development Agreement (1977, as amended)
DATE
October 23, 2026
CONTENTS
1 Cover
2 Summary & scope
3 Site plan (survey)
4 Bldg 2 aerial
5 Bldg 2 existing
6 Bldg 2 photo mockup
7 Bldg 2 3D view
8 Bldg 2 sheet A-201
9 Bldg 1 existing
10 Bldg 1 photo mockup
11 Bldg 1 sheet A-202
12 Bldg 1 Patera plans
13 Materials & colors
14 Sign A - unit numbers
15 Sign B - monument
16 Brand context
17 Bldg Permit - Bldg 2
18 Bldg Permit - Bldg 1
19 Sign Permit - A
20 Sign Permit - B
NORTH SHORE COMMERCE CENTER | BUILDINGS 1 & 2 | 9091 N. DEERWOOD DR. · 9050-9088 N. DEERBROOK TRAIL · BROWN DEER, WI 53223
Project summary & scope of work
What is changing, why, and how it follows the North Shore Commerce Center brand standards
PROJECT
IC Holdings 5A, LLC acquired the three former Brown Deer Business Park buildings on July
31, 2026 and is repositioning them as North Shore Commerce Center. This submittal covers
the rear (parking-lot) elevations of Building 1 at 9091 N. Deerwood Dr. (west wall) and
Building 2 at 9050-9088 N. Deerbrook Trail (south wall, facing the shared interior lot), both
being converted to small-bay flex/contractor units with drive-in access.
SCOPE OF WORK
1.
Building 2 (12'-0" wall): install 8 insulated sectional overhead doors, 10'-0" W x 11'-0" H,
white: 6 replace existing doors in the recessed bays, 2 are new masonry openings in the
longest brick runs (D2, D6).
2.
Building 1 (14'-0" wall): install 8 new 10'-0" x 11'-0" white overhead doors in new
masonry openings, one per unit, in the brick run beside each unit's existing recessed
storefront entry. Storefronts and brown fascia remain. Planting bed at each new door
replaced with a concrete apron.
3.
Building 2: remove the brown metal canopy panels in each recess; install a slim
prefinished metal header band, Barrier Orange (#FF6A00), 11'-0" to 11'-8", with
charcoal coping to the 12'-0" top of wall. Building 1: Barrier Orange header 11'-0" to
11'-8" over each new door; brick above to the existing coping.
4.
Existing face brick remains unpainted on both buildings. Existing service doors (Bldg 2)
and storefront entries (Bldg 1) remain.
5.
New steel lintels at all new masonry openings (8 at Bldg 1, 2 at Bldg 2) and raised heads
at the six existing Bldg 2 openings, designed by Patera / structural engineer. Patera to
revise Prelim #1 sheets A-1.1 / A-1.2 to the Bldg 1 door locations shown on A-202.
6.
Signage: (A) white unit numerals 1-8 on the header above each overhead door at both
buildings (16) plus one building address set per building; (B) one landlord
monument/directory sign at the Deerbrook Trail entry per the Colliers brand concept.
CODE / APPROVALS
Business Planned Development District. Use continues as warehouse / service center / light
manufacturing per Exhibit I of the Brown Deer Business Park Development Agreement, as
amended. Exterior alteration and signage are submitted for Building Board review (PPR) with
a commercial Building Permit application and Sign Permit applications. Electrical permits by
licensed electrician if any sign is illuminated.
BLDG 2 DOOR SCHEDULE (west to east, CL from west end)
TAG
WORK
CL FROM W.
SIZE
NOTE
D1
Replace
7'-0"
10' x 11'
Exist. recess
D2
New
49'-6"
10' x 11'
New opening + lintel
D3
Replace
81'-8"
10' x 11'
Exist. recess
D4
Replace
141'-6"
10' x 11'
Exist. recess
D5
Replace
191'-8"
10' x 11'
Exist. recess
D6
New
225'-5"
10' x 11'
New opening + lintel
D7
Replace
252'-8"
10' x 11'
Exist. recess
D8
Replace
311'-7"
10' x 11'
Exist. recess
BLDG 1 DOOR SCHEDULE (south to north, CL from south end; all new openings)
TAG
UNIT
CL FROM S.
SIZE
NOTE
D1
Unit 8
51'-6"
10' x 11'
New opening + lintel
D2
Unit 7
110'-4"
10' x 11'
New opening + lintel
D3
Unit 6
134'-10"
10' x 11'
New opening + lintel
D4
Unit 5
186'-4"
10' x 11'
New opening + lintel
D5
Unit 4
280'-5"
10' x 11'
New opening + lintel
D6
Unit 3
304'-10"
10' x 11'
New opening + lintel
D7
Unit 2
349'-10"
10' x 11'
New opening + lintel
D8
Unit 1
409'-10"
10' x 11'
New opening + lintel
Bldg 2: 344'-9" wall, 12'-0" high (Matterport 4/9/26). Bldg 1: approx. 439'-10" wall, 14'-0"
high (scaled from Patera 26-287 Prelim #1). All dimensions approximate; field verification
and structural design by Patera precede construction documents.
Village of Brown Deer Building Board submittal · October 23, 2026 · Professionally Managed by Newlane Management
Page 2 of 20
NORTH SHORE COMMERCE CENTER | BUILDINGS 1 & 2 | 9091 N. DEERWOOD DR. · 9050-9088 N. DEERBROOK TRAIL · BROWN DEER, WI 53223
Site plan - ALTA/NSPS survey (Patera 26-287 sheet C-1, Pinnacle / Chaput)
North up. Building 1 (east building) along N. Deerwood Dr.; Building 2 (north building) along N. Deerbrook Trail. Both rear elevations face the shared interior parking lot.
BLDG 1 REAR (WEST) WALL - 8 NEW O.H. DOORS, D1 (S) TO D8 (N)
BLDG 2 REAR (SOUTH) WALL - 8 O.H. DOORS, D1 (W) TO D8 (E)
B
SITE DATA
PARCELS
Parcel I 9088 N. Deerbrook Tr. (028-0020-001); Parcel II 9091 N.
Deerwood Dr. (028-0019-000); Parcel III 9000 N. Deerbrook Tr.
(028-0020-005)
GROSS LAND AREA
372,603 SF (8.5538 ac), three buildings
PARKING
375 stalls (363 regular + 12 accessible) per survey; no change
ZONING
Business Planned Development District; Brown Deer Business Park
Development Agreement (1977, as amended through the Tenth
Amendment, 2024)
FLOOD ZONE
Zone X (FIRM 55079C0037F, 10/24/2024)
WORK AREA
Rear walls of Buildings 1 and 2 only; no change to footprint, height,
parking or drive aisles
SITE WORK
Bldg 1: planting bed replaced by a concrete apron at each new door (8).
Bldg 2: new aprons at D2 and D6 if required.
SIGN B
Monument at the N. Deerbrook Trail entry drive; exact location set with
Village staff
Reduced from Patera Architecture + Engineering sheet C-1 (Pinnacle Engineering Group / Chaput Land Surveys ALTA survey, 2026). Not to scale on this page. Full-size survey available on request.
Village of Brown Deer Building Board submittal · October 23, 2026 · Professionally Managed by Newlane Management
Page 3 of 20
NORTH SHORE COMMERCE CENTER | BUILDINGS 1 & 2 | 9091 N. DEERWOOD DR. · 9050-9088 N. DEERBROOK TRAIL · BROWN DEER, WI 53223
Building 2 - aerial / door locations
Building 2 top-down from the Matterport scan, rear (south, interior-lot) elevation at the top of the image; Deerbrook Trail front at the bottom.
D1
D2
D3
D4
D5
D6
D7
D8
REAR ELEVATION - 344'-9" - 8 OVERHEAD DOORS, D1 (WEST) TO D8 (EAST) - SIGN A UNIT NUMERALS ABOVE EACH DOOR
B
SIGN B
N. DEERBROOK TRAIL SIDE (FRONT) - BUILDING 2 FOOTPRINT 344'-9" x 98'-10"
REAR (SOUTH) AT TOP
Overhead door D1-D8 (10' x 11', white)
Sign B monument / directory (Deerbrook Trail entry; exact location set with Village staff)
ADDRESS
9050-9088 N. Deerbrook Trail
FOOTPRINT
344'-9" x 98'-10" (approx. 32,500 SF)
BUILDING
Single-story brick, 12'-0" wall
REAR YARD
Existing parking / truck court
ACCESS
N. Deerbrook Trail & N. Deerwood Dr.
SITE WORK
None; existing aprons reused, new aprons at D2 & D6 if required
Source: Matterport scan "Brown Deer Building 2 FKA building 4 Exterior", T. Ingram, 4/9/2026. Door positions approximate.
Village of Brown Deer Building Board submittal · October 23, 2026 · Professionally Managed by Newlane Management
Page 4 of 20
NORTH SHORE COMMERCE CENTER | BUILDINGS 1 & 2 | 9091 N. DEERWOOD DR. · 9050-9088 N. DEERBROOK TRAIL · BROWN DEER, WI 53223
Building 2 - existing conditions
Rear (south, interior-lot) elevation as scanned April 2026: brown metal canopy panels over recessed bays, mixed door sizes, unpainted face brick
1. Rear wall looking east: existing recess with brown metal canopy panel, overhead door and glass entry.
2. Interior parking lot and west end of Building 2; cell tower and neighboring buildings beyond.
3. Rear elevation, three of six recessed bays visible (same view as the proposed mockup on page 6).
EXISTING CONDITIONS NOTED
•
Six recessed drive-in bays, each with a brown ribbed metal canopy panel, an overhead
door and a service door.
•
Existing overhead doors are smaller than the proposed 10' x 11' and vary in size and
condition (field verify).
•
Face brick in good condition; to remain unpainted per the brand standards and tenant
preference.
•
Dark brown metal coping at top of wall; replaced with charcoal prefinished metal.
•
Concrete aprons at each bay; asphalt lot with striped parking against the building.
Village of Brown Deer Building Board submittal · October 23, 2026 · Professionally Managed by Newlane Management
Page 5 of 20
NORTH SHORE COMMERCE CENTER | BUILDINGS 1 & 2 | 9091 N. DEERWOOD DR. · 9050-9088 N. DEERBROOK TRAIL · BROWN DEER, WI 53223
Building 2 - proposed: photo mockup
The April 2026 scan edited to show the new 10' x 11' white doors, Barrier Orange header, charcoal coping, and service doors kept in each bay
Three of the six recessed bays are visible from this camera position. Canopy panels removed; brick unpainted. Unit numerals (Sign A) shown on page 14.
Doors
10'-0" x 11'-0" insulated steel sectional, white, 3 lite options by tenant
Header
Prefinished metal, Barrier Orange #FF6A00, 11'-0" to 11'-8"
Coping
Prefinished metal, Charcoal #1F2328, to 12'-0" T.O. wall
Jambs / trim
Charcoal; existing brick unpainted
Village of Brown Deer Building Board submittal · October 23, 2026 · Professionally Managed by Newlane Management
Page 6 of 20
NORTH SHORE COMMERCE CENTER | BUILDINGS 1 & 2 | 9091 N. DEERWOOD DR. · 9050-9088 N. DEERBROOK TRAIL · BROWN DEER, WI 53223
Building 2 - proposed: full rear elevation, 3D view
All eight doors shown west to east with service doors, headers and coping; illustrative, not photo-real
Existing
Proposed
WHAT THE BOARD IS APPROVING
•
Change in exterior appearance of the rear elevation only: door size
and color, header band color and profile, coping color.
•
No change to building height, footprint, parking count or front
(Deerbrook Trail) elevation.
•
Colors per the North Shore Commerce Center Brand Standards
(Sept 2026), page 13.
Village of Brown Deer Building Board submittal · October 23, 2026 · Professionally Managed by Newlane Management
Page 7 of 20
NORTH SHORE COMMERCE CENTER | BUILDINGS 1 & 2 | 9091 N. DEERWOOD DR. · 9050-9088 N. DEERBROOK TRAIL · BROWN DEER, WI 53223
Building 2 - elevations & partial plan, sheet A-201
Proposed and existing rear elevations at 3/32" = 1'-0" (on 36x24 original), partial plan, enlarged details and door schedule
Reduced; not to scale on this page. Full-size sheet A-201 (36x24) is included as a separate PDF in the submittal.
Village of Brown Deer Building Board submittal · October 23, 2026 · Professionally Managed by Newlane Management
Page 8 of 20
NORTH SHORE COMMERCE CENTER | BUILDINGS 1 & 2 | 9091 N. DEERWOOD DR. · 9050-9088 N. DEERBROOK TRAIL · BROWN DEER, WI 53223
Building 1 - existing conditions
Rear (west) wall from the Matterport exterior scan: recessed aluminum storefront entries under brown metal fascia, face brick between, foundation plantings, 14'-0" wall
1. Typical rear bay: recessed entry, brown fascia, brick run for the new door (see page 10).
2. Service court end wall and the interior lot the rear wall faces.
3. Fenced dumpster enclosure and the one existing drive-in door (brown canopy) at the mid-building service court; both remain.
EXISTING CONDITIONS NOTED
•
Eight tenant units (Units 1-8, north to south) per Patera Prelim #1; each has a
recessed storefront entry on the west wall; two entries are shared between units.
•
Face brick in good condition, to remain unpainted. Brown ribbed metal fascia and soffit
at each recess remain.
•
Wall height approx. 14'-0" to top of coping (owner). No overhead doors in the brick
runs today.
•
Continuous planting bed and concrete entry walks along the wall; asphalt lot with
striped parking against the curb.
•
West lot is shared with Building 2 and the mid-building service court / dumpster
enclosure.
Village of Brown Deer Building Board submittal · October 23, 2026 · Professionally Managed by Newlane Management
Page 9 of 20
NORTH SHORE COMMERCE CENTER | BUILDINGS 1 & 2 | 9091 N. DEERWOOD DR. · 9050-9088 N. DEERBROOK TRAIL · BROWN DEER, WI 53223
Building 1 - proposed: photo mockup
Typical bay: new 10' x 11' white door cut into the brick beside the existing entry, Barrier Orange header with unit numeral, concrete apron; storefront unchanged
One of eight bays; the same treatment repeats at each unit along the west wall (see A-202, page 11). Brick unpainted. Existing storefront entry, fascia and plantings at the entry remain.
Doors
10'-0" x 11'-0" insulated steel sectional, white; 8
new masonry openings with steel lintels
Header
Prefinished metal, Barrier Orange #FF6A00,
11'-0" to 11'-8", 6" bearing each side
Jambs / trim
Charcoal #1F2328 break metal; brick above and
beside unpainted
Apron
Concrete apron 12' wide from door to curb
replaces planting bed at each door
Village of Brown Deer Building Board submittal · October 23, 2026 · Professionally Managed by Newlane Management
Page 10 of 20
NORTH SHORE COMMERCE CENTER | BUILDINGS 1 & 2 | 9091 N. DEERWOOD DR. · 9050-9088 N. DEERBROOK TRAIL · BROWN DEER, WI 53223
Building 1 - elevations & partial plan, sheet A-202
Proposed and existing rear (west) elevations, partial plan, enlarged details and door schedule (36x24 original)
Reduced; not to scale on this page. Full-size sheet A-202 (36x24) is included as a separate PDF in the submittal. Viewed from the west lot: Unit 8 (south) at left, Unit 1 (north) at right.
Village of Brown Deer Building Board submittal · October 23, 2026 · Professionally Managed by Newlane Management
Page 11 of 20
NORTH SHORE COMMERCE CENTER | BUILDINGS 1 & 2 | 9091 N. DEERWOOD DR. · 9050-9088 N. DEERBROOK TRAIL · BROWN DEER, WI 53223
Materials & colors
North Shore Commerce Center Brand Standards, September 2026 · Barrier Orange is the project accent, reserved for landlord signage and building elements
Barrier Orange
#FF6A00 · RGB 255/106/0 · CMYK 0|72|100|0
Door header band; monument frame
Charcoal
#1F2328 · RGB 31/35/40 · CMYK 77|68|60|69
Coping, jamb trim, sign cabinet
White
#FFFFFF
Overhead doors; unit numerals
Slate Gray
#6B737B · RGB 107/115/123
Service doors (existing, repainted)
Existing face brick
Unpainted
Remains as-is; tuckpoint as needed
EXTERIOR MATERIAL SCHEDULE
ELEMENT
SPECIFICATION
COLOR / FINISH
Overhead doors (16)
2" insulated steel sectional door, flush or raised-panel, factory white; 10'-0" x 11'-0"; 8 per building; low-headroom track at Bldg 2; optional top-section lites
White
Header band
24 ga. prefinished steel flat panel over new steel lintel / angle, 8" face (11'-0" to 11'-8"); continuous across each Bldg 2 bay, door-width + 6" each side at Bldg 1
Barrier Orange, custom color match #FF6A00 (70% PVDF)
Coping / cap
Bldg 2: 24 ga. prefinished steel coping, 4" face, 11'-8" to 12'-0". Bldg 1: existing coping remains
Charcoal (PAC-CLAD Charcoal or equal)
Jamb trim
Prefinished steel break metal at new and raised openings
Charcoal
Service doors / entries
Bldg 2: existing hollow metal doors and frames remain, repaint. Bldg 1: existing aluminum storefront entries and brown fascia remain
Slate Gray / existing
Brick
Existing face brick; clean and tuckpoint as required
Unpainted
Unit numerals
1/2" flat-cut aluminum, 6" cap height, Barlow Bold, stud-mounted to header band; 16 total + 2 address sets
White
Monument sign
Aluminum portal frame and panel per Colliers concept; see page 15
Barrier Orange / White / Charcoal
TYPOGRAPHY
Headlines & signage: Barlow (Google Fonts)
Body copy: IBM Plex Sans (Google Fonts)
Per the Brand Standards: Barrier Orange is carried on the metal elements, brick is left unpainted, and monument, wayfinding
and building identification signage is set in Barlow. Tenant signage follows the separate North Shore Commerce Center Sign
Criteria (individual block letters, 18" max letter height, front-lit channel letters on a color-matched raceway).
Left: North Shore Commerce Center Brand Guide (Colliers / Newlane, 2026).
Village of Brown Deer Building Board submittal · October 23, 2026 · Professionally Managed by Newlane Management
Page 13 of 20
NORTH SHORE COMMERCE CENTER | BUILDINGS 1 & 2 | 9091 N. DEERWOOD DR. · 9050-9088 N. DEERBROOK TRAIL · BROWN DEER, WI 53223
Sign A - unit numerals above overhead doors (Buildings 1 & 2)
Qty 16 numerals (1-8 at each building) + 2 building address sets · non-illuminated flat-cut aluminum · Barlow Bold · white
3
10'-0" OVERHEAD DOOR
20'-8" EXISTING RECESS (BLDG 2 TYP.; BLDG 1 HEADER IS DOOR WIDTH + 6" EACH SIDE)
11'-0"
12'-0" T.O. WALL
TYPICAL BAY ELEVATION · 5/16" = 1'-0"
3
8" HEADER
6" NUMERAL
NUMERAL DETAIL · 2" = 1'-0"
COPY
Numerals 1 through 8 at each building, one per overhead door, centered on the door header;
building address "9050-9088" (Bldg 2 west end wall) and "9091" (Bldg 1 south end wall),
12" cap height
MATERIAL
1/2" flat-cut aluminum letters, painted white (satin), stud-mounted 1/2" off header band
with spacers
SIZE
6" cap height x approx. 4" wide per numeral (0.17 SF each); address sets 12" high: 7'-0"
(7.0 SF) and 3'-0" (3.0 SF)
ILLUMINATION
None
TOTAL SIGN AREA
16 x 0.17 SF + 7.0 SF + 3.0 SF = 12.7 SF
INSTALL
By sign contractor (TBD) after header band installation
Font: Barlow Bold per NSCC Brand Standards. Numeral height fits the 8" header band; building address numerals meet the 6" minimum for emergency identification.
Village of Brown Deer Building Board submittal · October 23, 2026 · Professionally Managed by Newlane Management
Page 14 of 20
NORTH SHORE COMMERCE CENTER | BUILDINGS 1 & 2 | 9091 N. DEERWOOD DR. · 9050-9088 N. DEERBROOK TRAIL · BROWN DEER, WI 53223
Sign B - monument / directory sign
Landlord identification sign per the Colliers brand concept · one, single-faced · Barrier Orange portal frame · non-illuminated (ground lighting optional)
Colliers Wisconsin marketing concept, July 2026 (photo-composite).
Tenant 1
Tenant 2
Tenant 3
Tenant 4
Tenant 5
5'-0" OVERALL
4'-4" PANEL
10'-6" OVERALL HEIGHT
5'-10" PANEL
3'-0" GRADE TO PANEL
FRONT ELEVATION · 1/2" = 1'-0"
TYPE
Monument / directory (freestanding,
pole-mounted portal frame)
LOCATION
Landscape island at the N. Deerbrook Trail
entry drive to Building 2; setback and vision
triangle per Village code, confirmed with
staff
SIZE
5'-0" W x 10'-6" H overall; panel 4'-4" x
5'-10" = 25.3 SF
SIDES
One (1); optional second face if Village
permits
STRUCTURE
4" x 4" aluminum tube posts, 2" x 4" gable
rail, direct-burial concrete footings;
engineering by sign vendor
PANEL
.125 aluminum, white, with routed/applied
NSCC logo and five changeable tenant slats,
Barlow
COLORS
Frame Barrier Orange #FF6A00; copy
Charcoal #1F2328; panel White
ILLUMINATION
None proposed; optional ground-mounted
LED wash (would require electrical permit)
VENDOR
TBD; final shop drawings and footing design
to follow Building Board approval
Village of Brown Deer Building Board submittal · October 23, 2026 · Professionally Managed by Newlane Management
Page 15 of 20
NORTH SHORE COMMERCE CENTER | BUILDINGS 1 & 2 | 9091 N. DEERWOOD DR. · 9050-9088 N. DEERBROOK TRAIL · BROWN DEER, WI 53223
Brand context - Colliers concept renderings
How the Barrier Orange accent reads on the front elevations of Buildings 1 and 2 (concept only, not part of this permit)
Building 1 (9091 N. Deerwood Dr.) front: orange pilaster accents, building ID letters, tenant parking blocks.
Building 2 (9050-9088 N. Deerbrook Trail) front: Barrier Orange carried on the existing metal panel, brick unpainted.
The rear-elevation work in this submittal applies the same palette to the service sides of Buildings 1 and 2 so the property reads as one center from Deerwood Drive, Deerbrook Trail and the interior
parking lots. Front-elevation painting and building ID signage shown here will be submitted separately.
Village of Brown Deer Building Board submittal · October 23, 2026 · Professionally Managed by Newlane Management
Page 16 of 20