COMMITTEE OF THE WHOLE MINUTES
Jon Schultz, Mayor
Diahnn Halbach, City Clerk
Tuesday, October 20, 2026
1. Call to Order - Roll Call
Council President Tom Preusker, called the Committee of the Whole meeting to order at 6:30
p.m. on Tuesday, October 20, 2026 and presided on behalf of Mayor Jon Schultz, who was
excused. Council President Preusker retained his right to vote.
Roll Call: Present — Alderman Shad Branen, Alderman Andrea Brewer, Alderman Judi Adams,
Alderman Phil Hein, Alderman Katie Mooney, Alderman David Thompson, Alderman Tom
Preusker, Alderman Bill Smitz. Excused: Mayor Jon Schultz.
Staff present: City Administrator Carina Walters, Assistant City Administrator/Zoning
Administrator Megan Watkins, Finance/HR Director Deb Epping, Director of Public Works
Howard Moser, Fire Chief Tom Stuckart, Library Director Joe Davies (via Zoom), City Attorney
Elaine Ekes, City Engineer Gregory Governatori.
2. Citizen Comments: There were no citizen comments.
3. Approval of Minutes — To approve the October 6, 2026 Committee of the Whole Meeting
Minutes.
Motion: Alderman Branen. Second: Alderman Adams. With all in favor, the motion carried.
A. To approve the October 6, 2026 Committee of the Whole Meeting Minutes.
4. REPORTS BY ALDERMANIC REPRESENTATIVES AND DEPARTMENT HEADS
There were no Aldermanic Reports. City Clerk Halbach provided a reminder that the In-Person
Absentee Voting began that day at Public Works. Hours are 8:30–11:30 a.m. and 1:30–3:30
p.m., through next Thursday, with no weekend hours. On Friday, October 30, the final day of
early voting, the site will remain open until 5:00 p.m.
5. DISCUSSION:
A. A discussion regarding the Lead and Copper Rule Compliance Update.
Director Howard Moser reported that the utility completed required monitoring of 30 Tier 1 sites
(properties with known lead pipes) in June 2026. Four samples exceeded the 15
parts-per-billion action level. This triggered a DNR-mandated public notification campaign:
mailed results to all 30 participants
brochures posted in government buildings
press releases
a notice on utility bills
notices to at-risk customers, including the hospital, schools, and childcare facilities
Samples from the wells at all system entry points were within the expected range. The city must
remove all lead services by 2037, but all lead laterals must be removed by 2031 to avoid
implementing corrosion control measures. The city applied for a Safe Drinking Water loan to
remove its inventory of 477 private-side and 113 public-side laterals, 590 in total, over the next
couple of years. A DNR decision on the loan was expected that month, and the city will proceed
either way. The discussion served as part of the required notification process.
In response to questions, Director Moser stated:
Samples are tested for both lead and copper. A copper limit exists, but copper is not an
issue.
Whether loan funds could defray private-side costs for property owners depends on the
loan conditions, which will not be known until an award is made.
All 590 laterals would be considered Tier 1. He did not know how many would fail under
the forthcoming 10 ppb standard, but did not believe any of the other samples would have
exceeded it.
The four failing sites are scattered and not clustered in one area. Sampling relies on
homeowners following instructions to let water sit six hours, which he described as an
"imperfect system."
Affected owners were notified, and the city intends to address them through its lead lateral
replacement process, with property owners free to act sooner.
Home reverse osmosis systems help but use a large amount of water.
B. A discussion regarding the 2027 City of Burlington Budget.
Director Deb Epping presented the final discussion on the 2027 budget following monthly
workshops since June. The full budget document will come to the council in November for
review and approval. Key points from her cover memo:
Employee compensation: A 3% wage scale adjustment is planned. Health, dental, and
vision premiums remain flat for employer and employee because the self-insured plan
performed well.
Operational referendum: An operational referendum is likely in the future. Staff will keep
analyzing services and pursuing non-local funding.
Savings and grants:
Housing the library at City Hall saves more than $100,000 in rent and moving costs.
New janitorial contracts save over $14,000.
The school district's increased share of the school resource officer position saves
about $20,000 annually.
Insurance now covers more of the Lexipol subscription.
Replacing one fire department generator instead of two saves about $80,000.
Retrofitting existing playground equipment at Echo saves about $80,000.
2026 grant awards total over $610,000 across 14 grants, including $560,000 for the
library expansion.
General fund: Compared to 2026, general government decreases by about 2.8%, public
safety increases about 3.5%, and public works increases about 3%. Health and human
services (the Racine County animal shelter contract) decreases slightly, culture and
recreation increases slightly, and conservation and development increases because of
economic development activity.
Transfers: The general fund receives about $40,000 from the airport for administration
and a payment in lieu of taxes from the water utility. It transfers $150,000 to the EMS fund
and funds debt service and equipment replacement.
EMS fund: Billing collections are projected at about $600,000. The traditional $100,000
transfer to the equipment replacement fund was eliminated because ambulance
purchases will be funded through near-term borrowing.
Water and wastewater: Water revenues are projected to rise about 3% following the
2026 rate increase, and another rate case is anticipated. Wastewater is in the second year
of collection on its 2025 increase.
Equipment replacement: About $713,000 of near-term borrowing will be executed within
weeks and placed on the tax levy.
Airport: Fuel sales are budgeted conservatively below the 2026 projection of $1.1 million
because fuel prices are expected to ease.
Council President Preusker noted that the budget resulted from four workshops
(June–September). He explained that state levy limits tie levy growth to net new construction,
which has been flat and has not kept pace with inflation. Absent a change in state law, the city
faces a choice between reducing services and an operating referendum. He added that the
decline of volunteer fire service and the insourcing of EMS have shifted costs to the city.
Director Epping reported 2026 net new construction of 0.87%, or about $65,000.
In response to questions:
Alderman Smitz confirmed that increment from the new subdivision in a TID is unavailable
to the city until the TID closes, although net new construction includes that activity.
Alderman Branen asked about projected net new construction. Staff had not modeled it
but expected growth of under 2%, depending on the pace of construction.
At Alderman Branen's request, Director Epping agreed to provide a black-and-white
citywide, all-funds budget cover sheet already sent for publication.
Alderman Mooney asked about the airport deficit. Director Epping stated it is covered by
the airport's fund balance.
Alderman Branen asked about selling snowblowers. Director Moser said the city intends
to surplus one or both older units once the new one is in service, and proceeds would
appear under sale of equipment in the equipment replacement fund.
6. RESOLUTIONS:
At the Council President's direction, item 6.D was taken first so that the presenter, Jon
Cameron, could be heard.
A. Resolution 5509(39) — To approve the City of Burlington Fire Department's request to enter
into a three-year Stryker ProCare Preventative Maintenance Agreement, in the total amount of
$40,511.25, payable in annual installments of $13,503.75 for 2027, 2028, and 2029.
Chief Stuckard explained that since 2020 the department has used Stryker for LifePak
preventative maintenance (about $9,991 per year) and MedPro for other equipment (about
$1,368 per year), for a combined cost of about $11,359 annually. MedPro's service consisted
mainly of cleaning and lubrication, and parts and repairs had to be outsourced back to Stryker,
leaving the department with additional expenses for batteries and parts. The Stryker ProCare
agreement combines the services into a single manufacturer-performed agreement that
includes preventative maintenance, parts, labor, and travel. The annual cost is about $2,144
more than the current combined cost. The multi-year term earns a discount of about 25 percent
and locks in pricing, avoiding an anticipated 3 to 6 percent annual inflation. Service is performed
on-site at the firehouse. The chief noted the equipment is costly, including a recently purchased
power load and power cot at about $77,000, and that OEM parts are important.
In response to questions, Chief Stuckard stated that:
The agreement contains no repair timeframes, but Stryker has historically been
responsive, with delays occurring only from supply chain backlogs.
Stair chairs are excluded because they are non-motorized, inexpensive (about $1,300),
and largely serviceable in-house.
Automatic external defibrillators are excluded because they require no annual
maintenance, while the three manual defibrillators (LifePak 15) used by paramedics are
covered.
Equipment lifespans range from about 8 years for compression devices to 10 years for
defibrillators and 12–13 years for power loads, while cots are replaced as wear dictates.
Equipment still under manufacturer warranty is not covered until the warranty expires.
A longer term is possible, but inventory changes over time.
Additional equipment, such as a new ambulance, would require a separate agreement.
Maintaining a manufacturer's warranty requires showing good faith preventative
maintenance, performed by the manufacturer or a third party.
B. Resolution 5510(40) — To consider approving an amendment to the City of Burlington Fee
Schedule.
Director Watkins reported that department heads review the fee schedule annually to stay in line
with peer communities and the cost of services, and few changes were proposed. Four new
fees were added: a $15 provisional liquor license fee, a $50 sex offender residency appeal fee,
a $100 annual grease trap permit fee, and a $50 snow and ice removal fee charged on top of
existing labor and administration charges. Three fees were increased: two right-of-way permit
fees, by $50 and $30, and the well operation permit fee, by $25. Council President Preusker
noted that fees cannot be used to generate profit but should cover the city's increasing costs.
Alderman Mooney asked how the snow and ice removal fee operates. Director Moser confirmed
that it is a base fee plus an additional $50 for each repeat occurrence at the same property, so
that the first occurrence would be $110 and the second $160, excluding equipment and hourly
labor. In response to Alderman Smitz, Director Moser said such removal is not terribly common.
C. Resolution 5511(41) — Approving an Easement Agreement with TDS Metrocom, LLC at 517
Congress Street.
Director Moser explained that TDS, which is installing fiber throughout the city, has attached
conduit to the existing pedestrian bridge. The easement would cover a stretch of city-owned
parkland from the end of the bridge to Congress Avenue, allowing TDS to install and maintain
infrastructure, most likely by directional boring with minimal disturbance and required
restoration. He described it as a housekeeping matter, and staff recommended approval. TDS
had earlier attempted unsuccessfully to bore beneath the river, so attaching to the bridge was
approved.
Council President Preusker asked about the relationship with TDS and about restoration timing.
Director Moser said TDS typically works neighborhood by neighborhood under one permit and
returns to restore afterward, though not always as quickly as residents would like. Problems
stem mostly from varying quality among subcontractors. The city receives a fair number of
complaints, meets with TDS every two weeks, and forwards complaints to the company. He
stated that this installation was going comparatively well.
Alderman Mooney asked why an easement was needed and whether other routes existed.
Director Moser explained that the parcel is city-owned rather than right-of-way. Alderman
Mooney also raised concerns about trip hazards from above-ground boxes and uncovered
handholds near a children's play area, and asked whether TDS was aware of frequent flooding
of the river and bridge. Director Moser said TDS is aware of the flooding and that the plan is to
bore across Congress, with any handhold or pedestal on the far side rather than in the park.
Alderman Mooney asked that this be documented. Administrator Walters agreed that staff would
seek additional language to tighten the agreement to address both the placement of equipment
and restoration.
Alderman Branen asked whether this was TDS's only crossing request, and Director Moser said
it was the only one to date.
D. Resolution 5512(42) — To approve the 2027 Test Year Sewer Rate Study prepared by Ehlers
and increase the sewer user charges.
Jon Cameron of Ehlers stated that the city follows an every-other-year rate increase trajectory
on the sewer side and that 2027 is an increase year. The full cost of service study ensures rates
are fair and equitable across customer classes and accounts for the agreements with the city's
two sanitary districts. The average single-family residential increase would be 11.44 percent,
about $12 per quarter, for a customer using about 12,000 gallons per quarter (roughly 4,000
gallons per month). The increase incorporates recommended rate adjustments for both 2027
and 2028, so the city would not need to return for another sewer rate increase until 2029. This
also leaves room for a potential water rate case. Mr. Cameron said results landed on the
projections in the financial management plan, and that later increases would be driven by
inflationary operating costs and the capital improvement plan.
7. MOTIONS:
A. Motion 26-1192 — To approve revisions to the City of Burlington Employee Handbook.
Director Epping presented four revisions to take effect January 2027, to be distributed to
employees for acknowledgment of receipt:
Status changes would take effect at the start of a payroll period, which reduces manual
payroll entry and errors.
Purchasing language would be added so that all employees making purchases on behalf
of the city understand their obligations, including those without a credit card agreement.
The casual day provision would be clarified to require usage by a set date so that it is
either used or paid out cleanly.
The language on repayment of health insurance premiums upon termination after FMLA
leave would be clarified on the recommendation of the city's labor attorney.
Alderman Mooney asked whether the term "serious health condition" on page 50 would include
a permanent disability. Director Epping confirmed that it would.
B. Motion 26-1193 — Motion to approve a Third Amendment Lease Agreement between The City
of Burlington and Cellco Partnership, d/b/a Verizon Wireless.
Administrator Walters reported that after nearly two years of negotiations, staff reached a
mutually beneficial third lease amendment for Verizon's equipment on the Origen Street water
tower. Verizon had sought to reduce the rent, at one point by about $800, and the city had
weighed the risk of losing the revenue, which she said is roughly $40,000 or more annually. The
final terms are:
No rent reduction. Rent increases to $4,017 beginning December 1, up from the current
$3,900.
Either party may terminate on 24 months' notice, but not during the first five years.
The flat 3 percent annual escalator is retained.
Verizon will pay all engineering and third-party plan review costs.
Verizon will pay overage costs for city staff called out on short notice or outside normal
hours.
Verizon will be responsible for any damage to the tower during its transition back from the
temporary antenna, with KLM engaged to ensure no damage occurs.
The temporary pole will be completely removed and the area restored.
Walters said that if the Council approves the amendment on November 4, staff would work with
Verizon to return its antenna to the tower as soon as possible, and she noted that the city holds
three cell provider contracts yielding comparable revenue.
Council President Preusker called the result a significant win for the city and taxpayers, noting
that 5G requires more, not fewer, sites, and that without the lease other antennas might be
placed on private property. Walters added that the outcome affirms the value of the water tower.
In response to Alderman Branen, Walters confirmed that the temporary pole supports only
Verizon's equipment and will be removed.
Alderman Adams commended Walters, Director Epping, and staff on the favorable result, and
Alderman Thompson confirmed that Verizon will restore the temporary tower area and said he
looked forward to its removal.
8. ADJOURNMENT
Motion: Alderman Brewer. Second: Alderman Smitz. With all in favor, the motion carried, and
the meeting was adjourned at 7:48 p.m.
Minutes respectfully submitted by:
Diahnn Halbach
City Clerk