AGENDA
Public Works Committee
6:30 p.m. - Monday, October 26, 2026
Village Hall
300 W. Spring St. Rochester, WI
A meeting of the Public Works Committee will be held Monday, October 26, 2026 at 6:30 p.m. at the Village Hall.
Page
1. Roll Call by Chairperson: Gary Beck Jr.
Committee Members: Nick Ahlers, John Ehlers, Jim Rueter, Adam Schaefer, Jeff Sterling,
Doug Webb
Staff Members: Adam Davis, Public Works Manager; Gary Vogel, Village Engineer; Betty
Novy, Administrator-Treasurer; Amber Jensen, Clerk
2. Pledge of Allegiance
3. Submitted for Review and Approval
3.1. Minutes
Public Works Committee - Sep 28 2026 - Minutes - Pdf
3 - 5
4. Information Items
4.1. Western Racine County Sewerage District Report
WRCSD Agenda 20261020 FINAL
6 - 7
4.2. Review Submitted Stormwater Budget
Agenda Item Report - AIR-26-220 - Pdf
8 - 12
5. Action Items
5.1. Review and Possible Recommendation: GIS Work Order Updates
Agenda Item Report - AIR-26-221 - Pdf
13 - 16
5.2. Review and Possible Recommendation: Sidewalk Repair Survey
Agenda Item Report - AIR-26-224 - Pdf
17 - 25
5.3. Review and Possible Recommendation: Renewal of Special Exception Animal Permit
Agenda Item Report - AIR-26-217 - Pdf
26 - 28
5.4. Review and Possible Recommendation: Kate Shaffer Riverside Park Plans
Agenda Item Report - AIR-26-225 - Pdf
29 - 42
6. Adjourn
Amber Jensen, Clerk
Posted: October 23, 2026
It is possible that members and possibly a quorum of members of other governmental bodies of
the municipality may be in attendance at the above stated meeting to gather information; no
action will be taken by any governmental body at the above stated meeting other than the
governmental body specifically referred to above in this notice.
Please note: Upon reasonable notice, efforts will be made to accommodate the needs of
disabled individuals through appropriate aids and services. For additional information or to
request this service, please contact the Village Hall at 262‐534‐2431.
Page 2 of 42
Public Works Committee Meeting September 28, 2026
MINUTES
Public Works Committee
Meeting
6:30 PM - Monday, September 28, 2026
Village Hall
The Public Works Committee of the Village of Rochester was called to order on Monday, September 28, 2026,
at 6:30 PM, in the Village Hall:
1. ROLL CALL BY CHAIRPERSON: GARY BECK JR.
PRESENT: Gary Beck Jr., Nick Ahlers, Adam Schaefer, John Ehlers, and Jim Rueter
ABSENT: Douglas Webb and Jeff Sterling
STAFF
PRESENT:
Adam Davis, Public Works Manager, Amber Jensen, Clerk, and Betty
Novy, Village Administrator-Treasurer, Jaimi Lapp, Village Engineer
2. PLEDGE OF ALLEGIANCE
3. SUBMITTED FOR REVIEW AND APPROVAL
3.1. MINUTES
Adam Schaefer made a motion to approve meeting minutes from August 31, 2026 as
presented. John Ehlers seconded the motion. Carried unanimously.
4. INFORMATION ITEMS
4.1. WESTERN RACINE COUNTY SEWERAGE DISTRICT REPORT
Betty Novy reported on the recent Sewer District meeting. The District held a public hearing
regarding ordinance updates and received engineering updates regarding DNR permit renewal
requirements.
5. ACTION ITEMS
5.1. REVIEW AND POSSIBLE APPROVAL OF 2027 PUBLIC WORKS BUDGET
PROPOSAL FOR SUBMISSION TO THE FINANCE COMMITTEE
Adam Davis reviewed the proposed 2027 Public Works Budget, highlighting capital and
maintenance items including replacement of the library's failing ceiling-mounted heating unit,
installation of a water softener system at the library, potential development of construction-
ready plans for Riverside Park, and funding requested by the Rochester Volunteer Fire
Company for exterior painting of the fire station.
The Committee also discussed anticipated expenditures for contracted street maintenance,
Page 1 of 3Page 3 of 42
Public Works Committee Meeting September 28, 2026
right-of-way mowing and brush removal, snow removal and road salt, park maintenance, the
sidewalk repair program, fire station improvements, and library maintenance and capital
projects. Members reviewed recent library plumbing repairs and considered quotes for the
library furnace replacement, water softener installation, and fire station painting.
Nick Ahlers made a motion to approve the Public Works Budget proposal and recommend that
it be submitted to the finance committee for consideration in 2027 budget preparations. Jim
Rueter seconded the motion. Carried unanimously.
5.2. REVIEW AND POSSIBLE RECOMMENDATION: SHOULDERING AND
DITCHING WORK FOR THE CAMELBACK SUBDIVISON
Adam Davis reviewed proposed shoulder restoration and ditch improvement projects within
the Camelback Subdivision, including areas along Hunter's Glen Road, Royal Hill Road, and
Abbey Lane. The proposed work would address erosion, deteriorated road shoulders, drainage
concerns, ditch reshaping, and culvert-related issues. Estimated costs provided by Racine
County were approximately $2,500 for ditching work on Abbey Lane and $8,000 per day for
shoulder restoration activities.
Nick Ahlers made a motion to recommend awarding the shouldering and ditch work in the
Camelback Subdivision to Racine County Public Works on a time and materials basis at an
estimated cost of $18,500-$26,500. Adam Schaefer seconded the motion. Carried
unanimously.
5.3. REVIEW AND POSSIBLE RECOMMENDATIONS REGARDING
RENEWALS OF 6 SPECIAL EXCEPTION ANIMAL PERMITS
Special Exemption Animal Permit Renewal to Keep 4 Chickens at 208 S. State St.
Special Exemption Animal Permit Renewal to Keep 3 Chickens at 2702 Fox Grove Dr.
Special Exemption Animal Permit Renewal to Keep 1 Mini Horse and 1 Donkey at
32364 Academy Road
Special Exemption Animal Permit Renewal to Keep 3 Chickens at 160 Heritage Road
Special Exemption Animal Permit Renewal to Keep 2.5 Chickens at 31017
Washington Ave.
Special Exemption Animal Permit Renewal to Keep 12 Chickens at 35307 Washington
Ave.
All six permits were reviewed. Davis confirmed that Racine County Sheriff's Office had no
reports of incidents related to any of the permit holders and that all permits are in good
standing.
Jim Rueter made a motion to recommend approval of 6 special animal permit renewals to the
Village Board. John Ehlers seconded the motion. Carried unanimously.
6. ADJOURN
Adam Schaefer made a motion to adjourn at 6:53 P.M. Nick Ahlers seconded the motion.
Carried unanimously.
Amber Jensen, Clerk
Page 2 of 3Page 4 of 42
Public Works Committee Meeting September 28, 2026
Page 3 of 3Page 5 of 42
The Western Racine County Sewerage District Commission will meet on Tuesday October
20th, 2026 at 5:30 PM, in the District Office, located at 1020 N River Road, Rochester, WI
Minutes
1. Applied technologies-Leo to update projection of the Phosphorus per pound.
oThe Commission discussed the phosphorus cost estimate and the projections
needed to meet the new criteria expected in five years. Members spent
approximately 40 minutes reviewing the figures and discussing options for
addressing any potential shortfalls.
2. Review and approve-construction related invoices for CWL approval
oAt the Rochester lift station, a 27-inch inlet discharges above Pump 3. The effluent’s
impact is causing the pump to cavitate, so a deflector plate has been proposed. A
design has been prepared, but members raised concerns and discussed alternative
designs.
3. Approve minutes
oApproved
4. Correspondence
oThe treasurer. Theres a lawyer rate hike. 3-4% for the sewer district lawyer. The
radiator for the generator was (discussed in previous meeting) 58-62 weeks out.
They are looking at a core rebuild in the range of around $70,000.
oATV route road questioned.
5. Monthly plant operations report
oMonthly flow increased slightly. The discharge remains within acceptable limits, and
plant upkeep is good. Batteries were replaced at the Rochester lift station. Sewer
fees were discussed at approximately $417–$420 per 1,000 gallons; surrounding
neighborhoods were reported to pay approximately $500–$700 per 1,000 gallons.
6. Financial Manager’s report
oGood
7. Approve expenditures
oApproved Page 6 of 42
8. Vice President’s report
oAbsent.
9. President’s report
oThe President referred to the discussion above and requested a different design for the
Rochester deflector plate. Several options were discussed.
10.New WRCSD.US emails and passwords
oWent over all good
CLOSED SESSION, pursuant to s. 19.85 (1), Wis. Stats.
A motion will be taken up pursuant to Wis. Stat. Section 19.85(1)(e) for the purpose of “deliberating or
negotiating the purchasing of public properties, the investing of public funds, or conducting other specified public
business, whenever competitive or bargaining reasons require a closed session” as applied to a potential sewer
service agreement with the Villages of Rochester and Waterford, and the Town of Waterford Sanitary District.
The Commission shall RECONVENE INTO OPEN SESSION reserving the right to take action on the matter discussed
in closed session, and to move to the remaining meeting agenda as posted.
Any other business to come before the Commission
Vince Klemko, President
Page 7 of 42
Village of Rochester
Agenda Report
Public Works Committee - Oct 26 2026
Prepared For:
Public Works Committee
Staff Contact:
Adam Davis, Public Works Manager
Agenda Item:
Review Submitted Stormwater Budget
Purpose/Nature of the Proposal:
Review the submitted Stormwater Utility Budget.
With the costs associated with the Oak Knoll Road project for 2026, the budget for 2027 is set up as a
maintenance budget to cover operational costs and rebuild the capital project fund for future projects.
Attachments:
2027 Proposed Stormwater Utility Budget
Budget Report Stormwater Utility 2027
Page 1 of 5 Page 8 of 42
2027 Proposed Stormwater Utility Budget Worksheet
Account Number Account Description
2024 Actual 2025 Actual
2026 Actual Through
8.31.2026
9.1.2026-
12.31.2026
(Estimated)
2026 Total
(Actual +
Estimated) 2026 Budget
2027
Proposed
Budget
109-56-48100-000-000Interest on Temporary Investments 11,773.63 4,522.21 3,155.91 3,155.91 5,000.00 1,000.00
109-56-48200-000-000Stormwater Utility Fees 116,145.37 116,860.37 116,821.37 - 116,821.37 116,886.00 165,073.38
Toal Revenues:127,919.00 121,382.58 119,977.28 - 119,977.28 121,886.00 166,073.38
Fund Balance Carried Over from Previous Year:189,477.47 160,892.38 178,981.70 (28,592.48) 178,981.70 178,981.70 (78,032.38)
Operating/Capital Projects Funds:317,396.47 282,274.96 298,958.98 (28,592.48) 298,958.98 300,867.70 88,041.00
109-56-53100-110-000Public Works Dept Wages 21,129.80 20,861.62 14,210.57 7,200.00 21,410.57 20,000.00 24,666.00
109-56-53100-130-000Public Works FICA 1,505.04 1,570.61 1,010.29 551.00 1,561.29 1,522.00 1,887.00
109-56-53100-131-000Public Works WRS (Pension) 1,307.13 1,425.77 920.35 496.00 1,416.35 1,433.00 1,494.00
109-56-53100-132-000Health Insurance Benefit 5,109.26 5,547.30 3,915.29 1,962.90 5,878.19 5,671.00 5,904.00
109-56-53100-330-000Public Works Mileage - - - - 100.00 100.00
109-56-53440-361-000Stormwater Operations Related to Utility 15,630.00 12,000.00 - 15,000.00 15,000.00 15,000.00 15,000.00
109-56-53440-153-000Stormwater Administrative Expenses 14,063.01 18,030.80 13,682.91 - 13,682.91 14,760.00 14,800.00
109-56-53440-211-000Stormwater Audit Expenses 4,960.00 5,280.00 5,609.60 - 5,609.60 5,600.00 5,880.00
109-56-53440-212-000Stormwater Engineering Fees 8,290.00 - 387.50 2,000.00 2,387.50 3,000.00 2,000.00
109-56-53440-170-000Stormwater Drainage District Fees 13,281.87 12,706.07 12,130.32 - 12,130.32 13,000.00 13,000.00
109-56-53440-360-000Stormwater Equipment Expense(Truck Operating)923.94 1,461.89 92.40 500.00 592.40 950.00 310.00
109-56-53440-224-000Stormwater Mobile Services - - 300.99 400.00 700.99 720.00 1,000.00
109-56-53440-362-000Stormwater Fuel - - 292.77 400.00 692.77 800.00 1,000.00
109-56-53440-390-000Stormwater Misc Exp - - - 500.00 500.00 1,000.00 1,000.00
109-56-57331-810-000Stormwater Equipment Expense( Capt Outlay) - 18,151.47 18,151.47 19,000.00 -
109-56-57100-212-000Stormwater Capital Projects Engineering 15,766.24 3,426.15 - - - -
109-56-57100-213-000Stormwater Capital Projects Construction Costs54,537.80 4,883.05 - - - -
109-56-59200-000-000Transfer to Other Funds(Oak Knoll Rehab Project) 16,100.00 256,847.00 20,430.00 277,277.00 274,530.00 -
Total Expenditures:156,504.09 103,293.26 327,551.46 49,439.90 376,991.36 377,086.00 88,041.00
Excess of Revenues Over (Under) Expenditures:(28,585.09) 18,089.32 (207,574.18) (49,439.90) (257,014.08) (255,200.00) 78,032.38
Transfer to Capital Projects Fund (Fund Balance 12.31.202X):160,892.38 178,981.70 (28,592.48) (78,032.38) (78,032.38) (76,218.30) -
Other Financing Receipts (Disbursements)
109-00-11310-000-000 Interfund Advances Out (Due from Other Funds)
109-00-24300-000-000 Interfund Advances In (Due to Other Funds) 78,032.38 76,218.30 (78,032.38)
Total Other Financing Receipts (Disbursements) -
Net Change in Fund Cash Balances(28,585.09) (257,014.08) (255,200.00) -
Fund Cash Balances, January 1189,477.47 - 178,981.70 -
Fund Cash Balances, December 31160,892.38 160,892.38 (178,981.70) - -
Page 2 of 5Page 9 of 42
2027 Proposed Stormwater Utility Budget Worksheet
Utility Fee Revenue:165,073.38
Unit Count 1,802.50
26 Stormwater Utility Fee (Per REU):91.58
ROUNDED: 92.00
2025 Stormwater Utility Fee: 65.00
($27 increase)
Page 3 of 5Page 10 of 42
Budget Report Stormwater Utility 10/26/2026
Budget Items.
Account Code: 109-56-53440-361-000 Stormwater Operations Related to Utility
This is primarily used for yearly Leaf Collections costs and miscellaneous ditching projects. For
increased hours for leaf collection $15,000.00 should be sufficient.
Account Code: 109-56-53440-212-000 Stormwater Engineering Fees
This is for General Consulting and GIS updates for the utility and not applied to specific projects.
$2,000.00
Account Code: 109-56-53440-360-000 Stormwater Equipment Expense(20%)
Carried over from PW budget. This is for truck maintenance. $310.00
Account Code: 109-56-53440-224-000 Stormwater Mobile Services
Split equally with Sewer Utility and P .W. General Funds. This is for US Cell and ARC GIS costs.
$1,000.00
Account Code: 109-56-53440-362-000 Stormwater Fuel (20%)
Fuel is split out from Equipment expense and into its own category for 2026. Cover fuel needs
related to the utility. $1,000.00
Account Code: 109-56-53440-390-000 Stormwater Misc Expense
Covers Miscellaneous costs related to the utility. Exp: Spray paint for markings, tools, Etc. Split off
Public Works budget to share costs over both utilities. $1,000.00
Capital Projects:
Account Code: 109-56-57331-810-000 Stormwater Equipment Expense (Capt Outlay)
No plan for 2027
Page 4 of 5 Page 11 of 42
Account Code: 109-56-57100-212-000 Stormwater Capital Projects Engineering
For engineering cost related to Capital Projects. For 2027, no projects are planned.
Account Code: 109-56-825-53442 Capital Projects Land Acquisition
This is for acquiring easements for new or replacements of stormwater related drainage pipes.
Nothing is planned for 2027.
Account Code: 109-56-57100-213-000 Capital Projects Construction Costs
No plan for 2027
Page 5 of 5 Page 12 of 42
Village of Rochester
Agenda Report
Public Works Committee - Oct 26 2026
Prepared For:
Public Works Committee
Staff Contact:
Adam Davis, Public Works Manager
Agenda Item:
Review and Possible Recommendation: GIS Work Order Updates
Recommended Action:
To approve a Work Order from Baxter & Woodman for GIS updates for $3,000.00.
Purpose/Nature of the Proposal:
To review a Work Order from Baxter & Woodman for further updates to existing assets, and to create
new layers for street signs and Right of Way Tree inventory.
This update will add missing information for storm water structures and mains to include Racine
County's system. Add as built information and restructure the manhole layout for the sanitary sewer
system.
The additional layers for street signs and ROW trees will give staff the ability to inventory, track, and
locate assets.
Financial Impact/Analysis:
Work order can be split evenly between the Engineering Accounts in the Public Works, Stormwater,
and Sanitary Sewer budgets.
Alternative Action:
Provide a different direction.
Attachments:
B&W W.O. GIS Development 2026
Page 1 of 4 Page 13 of 42
500 East Main Street, Suite 101, Waterford, WI 53185 | (815) 459-1260 | baxterwoodman.com
Work Order
VILLAGE OF ROCHESTER, WISCONSIN
GIS DEVELOPMENT
Engineer’s Project No. 2601849.00
Project Description:
The Project includes continued GIS data and application development for the Village’s GIS through ArcGIS
Online. GIS layers and a Field Map app will be developed for the collection of signs and tree assets.
Additional GIS assistance will include as-built updates and sanitary sewer system data maintenance.
Engineering Services:
Provide engineering services for the Project as described in Attachment A. Manpower requirements and
a fee summary are listed in Attachment B.
Compensation:
Compensation for the services to be provided under this Work Order will be in accordance with the
Engineering Services Agreement dated February 20, 2008. The Engineers’ fee will be based upon standard
hourly rates of compensation for actual work time perf ormed plus reimbursement of out -of-pocket
expenses including travel, which in total will not exceed $3,000.00.
Submitted by: Baxter & Woodman, Inc. Approved by: Village of Rochester
By: __________________________________ By: ______________________________________
Gary A. Vogel, PE
Title: Vice President Title:
Date: __October 12, 2026________________ Date: ____________________________________
Additional Comments and Conditions: None.
Page 2 of 4 Page 14 of 42
Village of Rochester Attachment A
GIS Development
Engineering Services
Work Order 2601849.00
Project Description
The Village of Rochester would like to expand on its GIS development that was started in 2025. After
meeting with Mr. Davis, we identified a number of GIS projects and an overall goal of what the Village
would like to accomplish in this next phase of a GIS development. We have prepared a scope of services
and fee to complete those tasks.
Scope of Services
The following scope of services details the anticipated tasks necessary to successfully complete this
Project.
1. PROJECT COORDINATION AND DATA COLLECTION
A. Plan, schedule, and control the activities that must be performed to complete the project
including budget, schedule, and scope.
B. Coordinate with key Village staff to ensure the goals of the project are achieved.
2. ARCGIS ONLINE FIELD MAPS DEVELOPMENT
A. Develop two layers for street signs and trees and a n Esri Field Map that will allow Village
staff with an ArcGIS Online license the ability to collect these asset locations, attribute data,
and photos of each sign and tree they wish to inventory.
3. AS-BUILT UPDATES – Update Storm and Sanitary data based on as -built data provided by the
Village.
4. MISCELLANEOUS DATA AND LAYER UPDATES
A. Add Racine County storm sewer structures to the Village’s GIS webmap.
B. Update sanitary sewer manhole numbering to be unique ID values across the whole system.
C. Provide Zoning change and mapping updates as requested by the Village
P:\ROCHV\2601849-GIS Development\Contract\Work\2601849.00_WorkOrder_GIS_Development.docx
Page 3 of 4 Page 15 of 42
Task Planned Hrs Planned Labor Bill Reimb Allowance Total Compensation
23.00 2,985.00 0.00 2,985.00
1.00 340.00 0.00 340.00
1.00 200.00
6.00 340.00 0.00 340.00
2.00 350.00
4.00 520.00
7.00 955.00 0.00 955.00
1.00 175.00
6.00 780.00
9.00 1,350.00 0.00 1,350.00
4.00 700.00
5.00 650.00
Village of Rochester
Plan Number: 2601849.00
Plan Name: GIS Development
Attachment B
New Layer setup and Field Map development
Dan Sattler
Employee
Overall Project Total
Project Coordination
Carly Casper
Brandon Bywater
Brandon Bywater
Brandon Bywater
Misc GIS data development
Asbuilt data updates
Carly Casper
Carly Casper
Page 4 of 4 Page 16 of 42
Village of Rochester
Agenda Report
Public Works Committee - Oct 26 2026
Prepared For:
Public Works Committee
Staff Contact:
Adam Davis, Public Works Manager
Agenda Item:
Review and Possible Recommendation: Sidewalk Repair Survey
Recommended Action:
To approve Safe Steps proposal for $6,512.00
Purpose/Nature of the Proposal:
This proposal is a follow up to the 2026 sidewalk project. Safe Step is performing sidewalk repairs on
North and South State St. to remove trip hazards.
This proposal is to review all remaining sidewalk in the Village, inventory areas for repairs and
replacement, prioritize areas, and set up a repair schedule. Safe Step charges upfront for the proposal,
but refunds the cost of the survey over 2 years of projects in credits towards the repairs. Total cost for
the survey is $6,512.00
Financial Impact/Analysis:
To be paid for out of the Sidewalk fund for 2026.
Alternative Action:
Provide a different direction.
Attachments:
Rochester 2026 Sidewalk Evaluation Proposal
Page 1 of 9 Page 17 of 42
Presented to: Adam Davis
Village of Rochester
Rochester 2026 Sidewalk Evaluation Proposal
September 28, 2026
Scott Prochaska • Project Manager • 920.636.8231• Scott@notrippin.com • www.notrippin.com
Information contained in this proposal is proprietary and confidential, and is to be used solely by Village of Rochester personnel in
evaluating the project. Copying, unauthorized disclosure, reuse in any form is prohibited.
Sidewalk
Evaluation
Proposal
Page 2 of 9 Page 18 of 42
Scott Prochaska • Project Manager • 920.636.8231• Scott@notrippin.com • www.notrippin.com
Information contained in this proposal is proprietary and confidential, and is to be used solely by Village of Rochester personnel in
evaluating the project. Copying, unauthorized disclosure, reuse in any form is prohibited.
1
Introduction
September 28, 2026
Adam Davis
Village of Rochester
300 W Spring St
Rochester, Wisconsin 53167
Adam,
Thank you for the opportunity to present this proposal for sidewalk side evaluation.
Review
1. The Village of Rochesterhas requested Safe Step LLC evaluate sidewalk segments identified by theVillage of
Rochester.
2. Safe Step LLC will evaluate sidewalks for defects that present a trip hazard and are appropriate for saw-cutting
repair based on the identification criteria on page 5.
3. Safe Step LLC will also evaluate sidewalks for defects that are not appropriate for saw-cutting repair and will
require alternative repair methods.
4. Safe Step, LLC will provide deliverables that include locations, descriptions, suggested repair types, and photos
of each defect identified.
5. A credit of$6,512.00 may be applied to a resulting saw-cutting repair project proportional to the approved saw-
cutting project must be approved by June 1, 2027. Invoicing to be divided into two installments:
1. 2027 Production: Billed upon completion of production in 2027.
2. 2028 Production: Billed after May 1, 2028, upon completion of production in 2028.
Notable Proposal Contents
• Page 2: Execution Strategy
• Page 3: Priority Areas Map
• Page 4: Evaluation Criteria
• Page 7: Proposal Acceptance
Please let me know if you have any questions. We look forward to serving your needs.
Scott Prochaska
Project Manager
920.636.8231
Scott@notrippin.com
Page 3 of 9 Page 19 of 42
Scott Prochaska • Project Manager • 920.636.8231• Scott@notrippin.com • www.notrippin.com
Information contained in this proposal is proprietary and confidential, and is to be used solely by Village of Rochester personnel in
evaluating the project. Copying, unauthorized disclosure, reuse in any form is prohibited.
2
Execution Strategy
Based on our discussions, Safe Step will execute the project as follows:
1. Confirm sidewalk evaluation area and defect identification criteria (enclosed)
1. Page 3 of this proposal contains the sidewalk areas and the priority in which they should be
evaluated and repaired.
2. Page 4 of this proposal contains the defect identification criteria that will be used to evaluate the
sidewalks.
2. Evaluate current sidewalk conditions
1. Safe Step LLC will evaluate the predetermined sidewalk locations.
2. Identified defects will be recorded along with the measurement, address, approximate GPS
coordinates, important notes, and a photo of the defect.
3. Deliver evaluation results
1. Following the completion of the evaluation, Safe Step LLC will provide the sidewalk defect data
through a proprietar online t y ool called Centr Sidewalk al™ da 60 for Access ys. will continue
uninterrupted with the approval of a saw-cutting project within that time period.
1. Sidewalk Central™ allows you to review, make notes, and confirm the preferred repair type
for each defect.
2. The data will also be delivered in spreadsheet form.
4. Propose saw-cutting repair project based on sidewalk evaluation (optional)
1. After you review and confirmation by Safe Step LLC, Safe Step LLC will provide a proposal for the
selected saw-cutting repairs.
2. All proposed saw-cutting repairs will be done in accordance with "The Safe Step LLC Approach"
outlined on page 5 of this proposal.
3. Sidewalk Centr al™ alllows the monitoring of the saw-cutting in r eal-time, providing defect
completion status as well as repair photos and timestamps for quality assurance.
Page 4 of 9 Page 20 of 42
Scott Prochaska • Project Manager • 920.636.8231• Scott@notrippin.com • www.notrippin.com
Information contained in this proposal is proprietary and confidential, and is to be used solely by Village of Rochester personnel in
evaluating the project. Copying, unauthorized disclosure, reuse in any form is prohibited.
3
Priority Areas Map
Survey Area and Priorities
1. Priority 1: Red (4.07 Total Miles)
Map Data: Google
Page 5 of 9 Page 21 of 42
Scott Prochaska • Project Manager • 920.636.8231• Scott@notrippin.com • www.notrippin.com
Information contained in this proposal is proprietary and confidential, and is to be used solely by Village of Rochester personnel in
evaluating the project. Copying, unauthorized disclosure, reuse in any form is prohibited.
4
Sidewalk Evaluation Criteria
Page 6 of 9 Page 22 of 42
Scott Prochaska • Project Manager • 920.636.8231• Scott@notrippin.com • www.notrippin.com
Information contained in this proposal is proprietary and confidential, and is to be used solely by Village of Rochester personnel in
evaluating the project. Copying, unauthorized disclosure, reuse in any form is prohibited.
5
The Safe Step Approach
Specifications
1. Repairs will be tapered to a 1:12 slope ratio and taken to a zero point of differential between adjoining sidewalk
panels along the full width of the sidewalk, in accordance with ADA standards.
2. Repairs shall have a smooth and uniform finish with a coefficient of friction meeting OSHA requirements and
shall not impact adjoining sidewalks, driveways, landscaping, or other objects within the vicinity of the work.
3. In instances where sidewalk conditions do not permit a 1:12 slope ratio, repairs will be made with the shallowest
slope possible for the given sidewalk condition.
Clean-up
1. All saw-cutting will be performed without water-cooling; No slurry will be created eliminating the risk of “tracking”
and run-off water contamination.
2. Saw mounted dust abatement systems will be used to minimize airborne dust. Containment systems are
designed for fine dust applications.
3. Debris and concrete shall be cleaned from the sidewalk surface as well as surrounding rails, sidewalks,
driveways, landscaping, or other objects within the vicinity of the work.
Reporting
1. Upon completion of the project, Safe Step LLC will provide a detailed and audit-able report. This report will include
the street address or location, dimensions, and GPS coordinates of each repair made.
2. An invoice for payment will be provided when the projected has been completed. Payment in full is due30 days
from the date of invoice. Late payments may be subject to a $30 re-billing fee.
Safety and Insurance
1. Safe Step LLC employees who work directly in slab displacement repair undergo a rigorous training process with
emphasis on safe work practices, OSHA-approved personal protection equipment, and quality workmanship. It is
not uncommon for our clients to receive unsolicited compliments on our safety practices and the quality of the
work performed.
2. Safe Step LLC is fully licensed and insured. Proof of auto, liability, and workers compensation insurance are
available upon request.
Page 7 of 9 Page 23 of 42
Scott Prochaska • Project Manager • 920.636.8231• Scott@notrippin.com • www.notrippin.com
Information contained in this proposal is proprietary and confidential, and is to be used solely by Village of Rochester personnel in
evaluating the project. Copying, unauthorized disclosure, reuse in any form is prohibited.
6
Our Result
Before
After
Before
After
Page 8 of 9 Page 24 of 42
Scott Prochaska • Project Manager • 920.636.8231• Scott@notrippin.com • www.notrippin.com
Information contained in this proposal is proprietary and confidential, and is to be used solely by Village of Rochester personnel in
evaluating the project. Copying, unauthorized disclosure, reuse in any form is prohibited.
7
Proposal Acceptance
Financial Parameters
1. Financial Parameters
1. The total cost of the consultation, evaluation, and reporting will not exceed $6,512.00
2. A credit of$6,512.00 may be applied to a resulting saw-cutting repair project proportional to the approved
saw-cutting project must be approved by June 1, 2027. Invoicing to be divided into two installments: 2027
Production: Billed upon completion of production in 2027. 2028 Production: Billed after May 1, 2028 upon
completion of production in 2028.
3. Safe Step LLC will accept full responsibility for any project cost overage, provided that the scope of the project
is not altered once the project begins. Any requested change in scope will be fully discussed and approved by
the Village of Rochester prior to the start of the work on the revised area.
Proposal #: 202846
PO Number: PO Number (Optional)
Cost: $6,512.00
Approved by: Approved by
SIGNATURE
Adam Davis Title: Title
Date SignedDate:
For a valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the above signed hereby agrees to defend,
indemnify, and hold contractor harmless with respect to any and all liability whatsoever arising from contractor’s activities in
attempting to repair concrete sidewalk and other slabs owned by the above signed or within the above signed’s dominion and control,
and to defend, indemnify, and hold harmless contractor with respect thereto.
Use this form to provide us with any other information we may need to know.
Client Notes:
Signed:
Billing Contact Name: Contact
Billing Email Address: Email
Does this project require prevailing wage?: Yes/No
If this proposal is acceptable, please complete and sign below. We will contact you upon receiving this form to schedule
your project.
Due to the ongoing supply chain issues and labor availability, the pricing in this proposal is only valid untilOctober 23,
2026.
Page 9 of 9 Page 25 of 42
Village of Rochester
Agenda Report
Public Works Committee - Oct 26 2026
Prepared For:
Public Works Committee
Staff Contact:
Adam Davis, Public Works Manager
Agenda Item:
Review and Possible Recommendation: Renewal of Special Exception Animal Permit
Recommended Action:
Approval to renew permit.
Purpose/Nature of the Proposal:
Review summited permit renewal for 35310 Lakewood Ave. Robert & Staci Kobs.
Staff has reviewed the renewal requests and found no issues. The permits are being presented to the
Board for consideration of renewal in accordance with applicable Village ordinances and permit
requirements.
Sherriff's Department has no record of animal control calls for this address.
Background/Summary:
12 Renewals have been approved thus far for 2026.
Alternative Action:
Provide a different direction.
Attachments:
Permit Renewal App Kobs 2026
Page 1 of 3 Page 26 of 42
Village of Rochester Application Fee: $50.00
PO Box 65 Payable to: Village of Rochester
Rochester WI 53167
SPECIAL EXCEPTION ANIMAL PERMIT
Application Date: v0 7:
l3 610; ,
Property Owner: Rebel—4b:1— 6Jc-cack‘t Ke125
Parcel#: 1767 on . \' \DQQ.
Phone Number:
Email Address:
Address: 3531C“ Len mama qur ,_
Zoning District: R7%
Acreage amount:
\x Site plan attached (showing area where animals will be penned, manure storage sites,
adequate draining facilities)
rg\ Written plan for disposal of manure
Statement or further explanation for Board to consider for approval:
:Sme Q W 5 x ‘
\
0“: E)‘\|\ GV\Q¥?? given“ 20 1<5.
Page 2 of 3Page 2 of 3 Page 27 of 42
9/30/26.3:24 PM MSB Payment System
I VILLAGE (11"-
ROCIIE STEI:
- ‘WISII 'OWHIN -
General Payments
300 W Spring St, Rochester, WI 53167
(262) 534-2431
Transaction Date/Time 09-30-2026 3:24 pm
Transaction Type Sale
Merchant ID 4445056995418
Terminal Identifier d3585f99—fc5d-4d63-932a-11f14c640021
Transaction ID CC7119913
Payment Type Credit Card
Card Logo Mastercard
Account Number 8649
Entry Contactlesslcc
Approval Code 276771
Response Code 00
A rovedcrypt°gram AEFECB5E1653DD3CB1556
Subtotal $50.00
Convenience Fee $2.95
Total Amount $52.95
Order Details
Item Reference Special Animal Kobs
Item Name Miscellaneous
1 x $50.00 $50.00
httpsz/ladmin.msbnexus.com/pointOfSaIe/receipt 1/1
Page 3 of 3Page 3 of 3 Page 28 of 42
Village of Rochester
Agenda Report
Public Works Committee - Oct 26 2026
Prepared For:
Public Works Committee
Staff Contact:
Adam Davis, Public Works Manager
Agenda Item:
Review and Possible Recommendation: Kate Shaffer Riverside Park Plans
Recommended Action:
Looking for Public Works Committee to provide direction moving forward.
Purpose/Nature of the Proposal:
The Village Board’s original direction was to explore incorporating the Riverside Park parking lot
replacement and a potential concrete pavilion pad into the Oak Knoll Road rehabilitation project. This
approach was put on hold pending final project costs and the opportunity to submit Riverside Park for
design through a capstone program.
The Oak Knoll Road project is now nearing completion, and the Village was not selected for the
capstone program.
Baxter & Woodman has submitted a work order to develop plans for the park improvements,
including site grading, an asphalt parking lot, pavement markings, standard lighting, an ADA-
accessible fishing pier, kayak launch, and park pavilion with a concrete floor. The work order also
includes preparation of bidding documents and assistance with bidding.
An alternative approach would be to develop a parking lot concept and use a pavilion design-supply
company to prepare engineered plans for the structure. This would allow the Village to purchase
pavilion materials directly, potentially reducing costs, and bid out construction to a local contractor.
Staff is seeking direction from the Committee on the preferred approach, including the pavilion’s size
and placement, desired amenities, and the overall scope of improvements to be included in the project.
Background/Summary:
A copy of similar documents from Racine County's latest pavilion project are attached below showing
a purchase requisition and bid documents for construction.
Page 1 of 14 Page 29 of 42
Financial Impact/Analysis:
Final proceeds from bond and remaining fund from the Oak Knoll Road project to be provided at
meeting.
Attachments:
2501707_Riverside Park_Work Order rev 3
Riverside Park Concept Plan 021326
B&W Park layout 4
Req Form Pavilion
Ford Construction
Completed Construction
Page 2 of 14 Page 30 of 42
500 East Main Street, Suite 101, Waterford, WI 53185 | (815) 459-1260 | baxterwoodman.com
Work Order
VILLAGE OF ROCHESTER, WISCONSIN
RIVERSIDE PARK IMPROVEMENTS
Engineer’s Project No. 2501707.00
Project Description:
The Project includes the development of parking lot infrastructure for the park including site grading,
asphaltic parking lot, pavement marking, s tandard lighting, ADA accessible pier, kayak launch, and park
pavilion with concrete floor.
Engineering Services:
Provide engineering services for the Project as described in Attachment A. Manpower requirements and
a fee summary are listed in Attachment B.
Compensation:
Compensation for the services to be provided under this Work Order will be in accordance with the
Engineering Services Agreement dated February 20, 2008. The Engineers’ fee will be based upon standard
hourly rates of compensation for actual work time performed plus reimbursement of out -of-pocket
expenses including travel, which in total will not exceed $39,500.00.
Submitted by: Baxter & Woodman, Inc. Approved by: Village of Rochester, Wisconsin
By: __________________________________ By: ____________________________________
Gary A. Vogel, PE Nick Ahlers
Title: Vice President Title: Village President
Date: __October 23, 2026_______________ Date: ____________________________________
Additional Comments and Conditions: Design of the pavilion is not included in the scope. It is anticipated
the Village will procure the pavilion materials and design fr om a supplier specializing in such s tructures.
The scope of this work order includes the design of the concrete pad for the structure. The pier and kayak
launch will be included in the project documents as design/build features for the contractor.
Page 3 of 14 Page 31 of 42
Village of Rochester, Wisconsin Attachment A
Riverside Park Improvements Page 1 of 3
Engineering Services
Work Order 2501707.00
PROJECT DESCRIPTION
The Project includes the development of parking lot infrastructure for the park including site grading,
asphaltic parking lot, pavement marking, s tandard lighting, ADA accessible pier, kayak launch, and park
pavilion with concrete floor.
SCHEDULE
Overall Park Project
Start Preliminary Design December 1, 2026
Final Plans March 31, 2027
Bid Letting April 16, 2027
Construction 2027 Season
SCOPE OF SERVICES
The Project includes management and preparation of one plan set consisting of Drawings, Specifications,
and Estimates.
1. PROJECT COORDINATION
1.1. PROJECT MANAGEMENT
A. Plan, schedule, and control the activities that must be performed to complete the
project including budget, schedule, and scope.
B. Coordinate with OWNER and project team to ensure the goals of the project are
achieved.
C. Prepare and submit monthly invoices and provide a monthly status report via
email describing tasks completed the previous month and outlining goals for the
subsequent month.
1.2 PROJECT MEETINGS
A. The following meetings are anticipated for this project:
1. Meetings with OWNER
a. Kickoff Meeting
b. Review Meetings as design work progresses
c. Pre-final (90%) Meeting
d. Attend Park Committee Meeting
B. OWNER will provide decisions on feature types from options provided by the
Engineer or other sources.
Page 4 of 14 Page 32 of 42
Village of Rochester, Wisconsin Attachment A
Riverside Park Improvements Page 2 of 3
Engineering Services
Work Order 2501707.00
1.3 VISUALIZATION
A. Create 3D rendering of existing and proposed park features utilizing existing data
and aerial mapping.
1.4 TOPOGRAPHIC SURVEY
A. Topographic Survey was completed during the design concept phase of the
Project.
2. PRELIMINARY DESIGN
2.1. PRELIMINARY DESIGN DOCUMENTS
A. Prepare preliminary plan sheets that indicate the proposed layout of design
elements.
B. Elements will include site grading, asphaltic parking lot, pavement marking,
standard lighting, grass restoration, erosion control, retaining walls where
needed, sidewalk removal or modification, ADA accessible Pier, kayak launch, and
park shelter.
• The pier and kayak launch will be in cluded in the project documents as
design/build features for the contractor. The materials for the pavilion
structure will be purchased by the Village separately and constructed by
a separate contractor under a separate contract with the Village.
C. Coordinate with local electrical utility to provide power to the site and for lighting
options.
D. Provide landscaping design specifically for the slope on the north end of the
property.
3. FINAL DESIGN
3.1. BIDDING DOCUMENTS/PROJECT MANUAL
A. Provide detailed drawings design elements and construction requirements. The
drawings will consist of plan view sheets for the various improvements.
B. Create all legends, general notes, and designer instructions to contractors, to
create a final set of construction drawings.
C. Prepare Design Documents consisting of Drawings and Specifications detailing
the general scope, extent, and character of construction work to be furnished and
performed by the Contractor(s). Specifications prepared in conformance with the
format of the Construction Specification Institute.
D. Prepare for review and approval by the OWNER and its legal counsel the forms of
Construction Contract Documents consisting of “Front End Documents” including
Advertisement for Bids, Bidder Instructions. Bid Form, Agreement, Performance
Page 5 of 14 Page 33 of 42
Village of Rochester, Wisconsin Attachment A
Riverside Park Improvements Page 3 of 3
Engineering Services
Work Order 2501707.00
Bond Form, Payment Bond Form, General Conditions, and Supplementary
Conditions, where appropriate, based upon standard OWNER contract
documents or documents prepared by the Engineers Joint Contract Document
Committee (EJCDC).
4. ENGINEER’S OPINION OF PROBABLE COST - Prepare Opinion of Probable Costs (OPC) for the
Project including: construction cost; contingencies; construction engineering services; and, on the
basis of information furnished by the OWNER, allowances for legal services, financial consultants,
and any administrative services or other costs necessary for completion of the Project.
5. AGENCY PERMITTING
5.1. Prepare and submit permit applications to the Wisconsin Department of Natural
Resources (WDNR) for a Chapter 30 permit for grading and construction of the kayak
launch and fishing pier.
5.2. Prepare and submit permit applications to the United States Army Corps of Engineers
(USACE) for a General permit for grading and construction of the kayak launch and fishing
pier.
6. PEER AND CONSTRUCTABILITY REVIEWS
6.1. Conduct engineering QA/QC peer reviews of drawings and specifications.
6.2. Conduct constructability review of drawings and specifications.
6.3. Make revisions to Drawings and Specifications based on comments from both engineering
and construction reviews.
7. BID ASSISTANCE
7.1. Provide design assistance and clarification for bid documents.
7.2. Assist the OWNER with coordination and scheduling during the bid process.
7.3. Provide documents for bidding and assist the OWNER in solicitation of bids from as many
qualified bidders as possible, prepare addendums as necessary.
7.4. Attend bid opening to receive and evaluate bids.
7.5. Tabulate bids and make a recommendation to the OWNER for an award of contract.
Page 6 of 14 Page 34 of 42
Task Planned Hrs Planned Labor Bill Reimb Allowance Total Compensation
190.00 39,250.00 250.00 39,500.00
10.00 2,350.00 0.00 2,350.00
2.00 550.00
8.00 1,800.00
6.00 1,450.00 100.00 1,550.00
2.00 550.00
4.00 900.00
96.00 18,980.00 150.00 19,130.00
2.00 550.00
50.00 11,250.00
8.00 1,240.00
24.00 3,720.00
12.00 2,220.00
24.00 4,600.00 0.00 4,600.00
2.00 550.00
12.00 2,700.00
6.00 930.00
4.00 420.00
4.00 1,000.00 0.00 1,000.00
2.00 550.00
2.00 450.00
4.00 770.00 0.00 770.00
2.00 450.00
2.00 320.00
44.00 9,760.00 0.00 9,760.00
2.00 550.00
40.00 9,000.00
2.00 210.00
6.00 1,110.00 0.00 1,110.00
4.00 900.00
2.00 210.00
Engineer V
Admin. Assist.
Engineer VII
Engineer V
Peer and Constructability Reviews
Engineer V
Permitting
Engineer VII
Admin. Assist.
Admin. Assist.
Engineer's Opinion of Probable Cost
Engineer V
Senior Construction Tech
Bid Assistance
Engineer V
Senior CAD Tech
Engineer II
Final Design
Engineer VII
Engineer V
Senior CAD Tech
Spatial Tech
Attachment B
Village of Rochester
Plan Number: 2501707.00
Plan Name: Riverside Park Improvements
Employee
Project Management
Engineer VII
Project Meetings
Design Services Total
Engineer VII
Preliminary Design
Engineer VII
Engineer V
Engineer V
Page 7 of 14 Page 35 of 42
ASPHASPH ASPH
ASPH
ASPH
ASPH
ASPH
ASPH
ASPH GRVLBRUSHLINE
30"16"
36"
48"40"22"
39"24"26"38"22"36"24"26"26"32"
32" 2"6"5"10"8"6"48"5"
BRUSHLINE
BRUSHLINE
25'3-8"
18"
25'7" 27"44" 2-12"2-24"2-14"9"
WATER EDGE
WATER EDGE WATER EDGE
BM#51 BM#52
2-8"12"
GSS
SS
SSSS
SS
POST
IE = 760.76
12" CMP
12" RCP
WOOD POSTW/ELECTRIC SERVICE
2" PVCSAN. VENT ORCLEAN OUT
OHOH
OH OHOHOHOHOHOHOHIP IP
IP
IP
769.45
767.75767.58766.38
768.43
766.38766.06766.06766.06765.60765.60765.60766.46
770.20MATCHMATCH MATCHMATCH775.52773.50772.50
770.73770.19768.87 773.37775.36
770.56
766.00
765.50765.50
766.00
765.50765
770
775
761762763764
766767768769771772773774
786784781779
764
768
767766765764763762761
770
775
769771772773774
769768
767 768769
770771770768
773775778772
772769
765.00PROPOSED GRADE
CROSSSECTION
765.00
765.50
766.00766.38768.37
770.43773.63
50'SHELTER SLAB
33'GRADEDGRASS SLOPE
6' WALK18'STALLS24'AISLE18'STALLS20'AISLE31'GRADEDGRASS SLOPE
766.06EXISTING GRADEPROPOSED GRADE
CROSS SECTION WISDOT/CADDS SHEET 42ECOUNTY:P:\ROCHV\2500403-OAK KNOLL REHABILITATION DESIGN\CAD\01_CIVIL 3D-2024\01_SHTS_PLANS\FRONT ST PRKLOT\020201-PD.DWGFILE NAME : 2/13/2026 8:54 AMPLOT DATE :PLOT BY :JAIMI LAPP
2
PROJECT NO: PLOT NAME :
2
VILLAGE OF ROCHESTER, WISCONSINSHEET
S FRONT STREET PARKING LOT PLOT SCALE :1 IN:50 FT2500403 3RACINESITE PLANLAYOUT NAME - 020201-pd (site)
NORTH BROWNS LAKE DRIVE
AG SCHOOL ROAD
10'W.E.P.CO. EASEMENT
12'
DRAINAGE EASEMENT
12'
MEANDER LINEMEANDER LINE
FOX RIVER
18'
24'
16'
14'
6'
WALK, FISHING PIER,CANOE/KAYAK LAUNCH(SURFACE TYPE TO BE CHOSEN)
12'
75' x 50'PROPOSEDPARK SHELTERBATHROOMS
24'
24'
FLOODPLAIN LIMITS
20'
NOTES:1.LIGHTING - PER WE ENERGIES2.WILD FLOWER AREA - TBD3.BRIDGE OVER FOX RIVER - TBD4.DISTURBANCE AREA - 43,100 SF (< 1 ACRE)
FOX RIVER
LIMITS OF DISTURBANCE
Page 8 of 14Page 36 of 42
ASPHASPH ASPH
ASPH
ASPH
ASPH
ASPH
ASPH
ASPH GRVLBRUSHLINE
30"16"
36"
48"40"22"
39"24"26"38"22"36"24"26"26"32"
32" 2"6"5"10"8"6"48"5"
BRUSHLINE
BRUSHLINE
25'3-8"
18"
25'7" 27"44" 2-12"2-24"2-14"9"
WATER EDGE
WATER EDGE WATER EDGE
BM#51 BM#52
2-8"12"
GSS
SS
SSSS
SS
POST
IE = 760.76
12" CMP
12" RCP
WOOD POSTW/ELECTRIC SERVICE
2" PVCSAN. VENT ORCLEAN OUT
OHOH
OH OHOHOHOHOHOHOHIP IP
IP
IP
WISDOT/CADDS SHEET 42ECOUNTY:P:\ROCHV\2500403-OAK KNOLL REHABILITATION DESIGN\CAD\01_CIVIL 3D-2024\01_SHTS_PLANS\FRONT ST PRKLOT\020201-PD.DWGFILE NAME : 10/17/2025 11:34 AMPLOT DATE :PLOT BY :JAIMI LAPP
2
PROJECT NO: PLOT NAME :
2
VILLAGE OF ROCHESTER, WISCONSINSHEET
S FRONT STREET PARKING LOT PLOT SCALE :1 IN:50 FT2500403 3RACINESITE PLANLAYOUT NAME - 020201-pd (site)
NORTH BROWNS LAKE DRIVE
AG SCHOOLROAD
10'W.E.P.CO. EASEMENT
12'
DRAINAGE EASEMENT
12'
MEANDER LINEMEANDER LINE
FOX RIVERFOX RIVER
75'50'
18'
24'
16'
14'
6'PAVED ADA WALKWITH RAMPS AND LANDINGS
PAVED WALK, FISHING PIER,CANOE/KAYAK LAUNCH
12'
PROPOSEDPARK SHELTER
BATHROOMBUILDING
24'
24'
24'17'
LAND OWNERSHIP TO BETRANSFERRED TO THE VILLAGE
6'
Page 9 of 14Page 37 of 42
PURCHASING REQUISITION FORM
Please email form with support to Purchasing@RacineCounty.com
Revised: 8/01/2022
Purchase Level Procurement Requirement
under $5,000 No comparison pricing or PO required. Pcard use is encouraged.
$5,000-10,000 Requires 3 verbal quotes to be documented on page 2.
$10,000-25,000 Requires 3 written letterhead quotes to be documented on page 2.
over $25,000 Contact Purchasing Coordinator ( 262-636-3700) regarding formal bid process.
DEPT: FISCAL YEAR: DATE
:
VENDOR NAME: VENDOR #: ADDRESS #:
(NEW = new vendor to be added; leave blank if unknown)
VENDOR ADDRESS:
VENDOR EMAIL:
SHIP TO ADDRESS IF OTHER THAN DEPT LISTED ABOVE:
PREPARED BY: PREPARER PHONE #:
PREPARER EMAIL:
DESCRIPTION:
NOTES TO BE PRINTED ON THE PO:
(Include information applicable to purchase – quote number and date, shipping information, term of procurement such as
for maintenance agreements 6/20/16 to 6/19/17, if maintenance agreement add when original procurement completed and
original PO/Contract number, down payment due at time of order, sole source vendor, emergency procurement, budget
authorization or resolution #, IT related purchase needs review and approval by IT Director. I.S. review – and add supporting
information into the attachment.) IT Approval and Date:
PRICING: (Freight should be listed separately.)
Quantity Mfg/Article Number Unit Price Extended Price
TOTAL: $
ACCOUNT NUMBER:
(if multiple accounts, please include splits in detail)
AUTHORIZED BY: AUTHORIZOR PHONE #:
Purchasing Use only:
Date Entered: Entered By: P.O. #:
Procurement rules are in Section 7 of the Racine County Ordinances. Please inquire with Finance at 262-636-3706 regarding Pcard use and issuance.
Page 10 of 14 Page 38 of 42
PURCHASING REQUISITION FORM
Procurement rules are in Section 7 of the Racine County Ordi nances. Please inquire with Finance at 262-636-3706 regarding Pcard use and issuance.
Please email form with support to Purchasing@RacineCounty.com
Revised: 8/01/2022
Is this purchase greater than $5,000 but less than or equal to $10,000? (Sec. 7-260(4)) Yes, No.
If this purchase fits this
category, you are required to get telephone quotes from a minimum of three vendors.
Please list them below.
Date Vendor Name Total Price$
Is this purchase greater than $10,000 but less than or equal to $25,000? (Sec.7-260(5)) Yes, No.
If this purchase fits in this category you must request (3) three written letterhead quotations from vendors. Results
and copies of their quotes should be attached to this form and indicated below.
Date Vendor Name Total Price$
______________________________________________________________________________________
All purchases in excess of $25,000 must follow the formal bid procedures specified within the Racine
County Procurement Ordinance (Sec. 7-261).
Was contact made with at least one certified minority-owned
business in Racine County? Yes, No.
If no, please give an explanation.
Certified MBE’s (Minority Business Enterprise) can be viewed at: https://wisdp.wi.gov/Search.aspx
I certify the above quotes have been received by me.
Signature Date
Page 11 of 14 Page 39 of 42
Page 12 of 14 Page 40 of 42
Page 13 of 14 Page 41 of 42
Page 14 of 14 Page 42 of 42