City Plan Commission — Agenda Packet
City of Stevens Point · Portage County · City Plan Commission · meeting of Sep 8, 2026 · Agenda packets
Open the original document More from City of Stevens Point
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Our intention is to have in-person meetings going
forward. For the time being, we will hold the City
Committee Meetings, Plan Commission, Council and
most others at the Community Room at 933 Michigan
Avenue. This in-person location will meet the legal
requirement for our open meetings.
We will have a virtual option available, but the
technology for the hybrid style meeting may not be
reliable all of the time.
AGENDA
CITY PLAN COMMISSION
Members
• Mayor Wiza
• Alderperson Kneebone
• Commissioner Arntsen
• Commissioner Beacom
• Commissioner Rice
• Commissioner Schade Stroik
• Commissioner Schuler
Date and
Time:
September 8, 2026
6:00 PM
Location:
Community Room
933 Michigan Avenue, Stevens Point, WI
OR
Zoom Teleconferencing
Meeting ID: 818 8195 9403
Passcode: 287906
By Computer:
https://us02web.zoom.us/j/81881959403?pwd=g5AVADlg
By Phone: +1-312-626-6799 (US Chicago)
Opening Section:
1. Roll Call
Discussion and Possible Action on:
2. Report of the August 3, 2026 meeting of the City Plan Commission.
3. Public Hearing and action on a request from Benjamin Nusz, representing Mid-State
Technical College, for a conditional use permit to operate a technical college facility on the
property located at 1101 Centerpoint Drive (Parcel ID 281240832202976), consistent with
Ch. 23.02(1)(c)(3)(d).
4. Public Hearing and action on a request from Christy Harris for a conditional use permit to
operate a large group day care center on the property located at 2343 Ellis Street (Parcel
ID 281240833201902), consistent with Ch. 23.02(1)(b)(3)(e).
5. Public Hearing and action on a request from Bill Pritchard, representing the Elizabeth
Revocable Trust, for a final subdivision plat review on an unaddressed parcel bounded by
West Zinda Drive (Parcel ID 281240831401241) and Lots 1-15 of the Riverwood West
Subdivision (Parcel ID 281240831401211-281240831401226), consistent with Ch.
20.05(2).
6. Public Hearing and action on a request from Jim Lucas, representing R&L Developers, for
a conceptual plan review of a proposed multi-family residential development on the
Page 1 of 116
property located at 1016 Third Street (Parcel ID 281240832200425), consistent with Ch.
23.02(4)(b)(5).
7. Public Hearing and action on a request from Jim Lucas, representing R&L Developers, for
a conditional use permit to construct a multi-family residential building on the property
located at 1016 Third Street (Parcel ID 281240832200425), consistent with Ch.
23.02(1)(f)(3)(b).
8. A request from Jim Lucas, representing R&L Developers, for a site plan review to construct
a multi-family residential building on the property located at 1016 Third Street (Parcel ID
281240832200425), consistent with Ch. 23.02(4)(b)(1)(2).
9. Public Hearing and action on a request from the City of Stevens Point to amend Chapter
23, Zoning Ordinance, of the Revised Municipal Code of the City of Stevens Point. Said
request amends Ch. 23.01(17)(i)(3)(a)(iv) to increase the maximum turnaround area size
allowed for driveways off of an arterial street from 80 square feet to 120 square feet.
10. July 2026 Monthly Report.
Closing Section:
11. Adjourn
PLEASE TAKE NOTICE that any person who has special needs while attending these meetings or needs agenda materials for these meetings
should contact the City Clerk as soon as possible to ensure that a reasonable accommodation can be made. The City Clerk can be reached by
telephone at (715) 346-1569 or by mail at 1515 Strongs Avenue, Stevens Point, WI 54481.
Maps further defining the above area(s) may be obtained from the City of Stevens Point Department of Community Development, 1515
Strongs Avenue, Stevens Point, WI 54481, or by calling (715) 346-1567, during normal business hours.
PLEASE TAKE FURTHER NOTICE that a quorum of the Common Council may be in attendance at this meeting.
Page 2 of 116
MINUTES
CITY PLAN COMMISSION
Members
• Mayor Wiza
• Alderperson Kneebone
• Commissioner Arntsen
• Commissioner Beacom
• Commissioner Rice
• Commissioner Schade Stroik
• Commissioner Schuler
Date and Time: August 3, 2026
6:00 PM
Location:
Community Room
933 Michigan Avenue, Stevens
Point, WI
OR
Zoom Teleconferencing
Opening Section:
1. Roll Call
• Meeting called to order at 6:00 P.M.
• Members present: Mayor Wiza, Alder Kneebone, Commissioners Arntsen,
Beacom, Schuler, Rice (online at 6:09pm).
• Members excused: Commissioner Schade Stroik.
Discussion and Possible Action on:
2. Report of the July 6 & July 20, 2026 meeting of the City Plan Commission.
• Background: Minutes of the July 6, 2026 and July 20, 2026 meetings of the City
Plan Commission were included in the agenda packet.
• Motion: Kneebone moves to approve the meeting minutes.
• Second: Beacom seconds the motion.
• Vote: Unanimous approval.
3. A request from Raymond Cal for an exception to fencing standards to install
privacy fencing on the property located at 1233 Maria Drive (Parcel ID
281240829300103) and an unaddressed parcel bounded by Maria Drive
(Parcel ID 281240829300139), consistent with Ch. 23.01(16)(g).
• Background: Associate Planner & Zoning Administrator Kuhn provides an
overview of the request.
• Motion: Arntsen moves to approve the request with a condition of obtaining a
building permit.
• Second: Kneebone seconds the motion.
• Discussion:
o Mary Mortell, part owner of the property, provides details about the
Page 3 of 116
proposed fence.
o Raymond Cal, part owner of the property, provides details about the
proposed fence.
• Vote: Unanimous approval.
4. A request from Chase Rettler, representing SentryWorld Real Estate LLC, for
an exception to fencing standards to install privacy fencing on the property
located at 501 Michigan Avenue North (Parcel ID 281240821310003),
consistent with Ch. 23.01(16)(g).
• Background: Associate Planner & Zoning Administrator Kuhn provides an
overview of the request.
• Motion: Wiza moves to approve the request with a condition of obtaining a
building permit prior to construction.
• Second: Schuler seconds the motion.
• Vote: Unanimous approval.
5. June 2026 Monthly Report.
• Background: Monthly reports are included in the agenda packet.
• Motion: Kneebone moves to accept and place the report on file.
• Second: Beacom seconds the motion.
• Vote: Unanimous approval.
6. Director's Report.
• Background: Director Kivela gives a verbal report.
Closing Section:
7. Adjourn
Adjourned at 6:23 P.M.
Page 4 of 116
Page 1 of 8
Administrative Staff Report
Department of Community
Development
Conditional Use Permit
1101 Centerpoint Drive
September 8, 2026
Applicant(s):
• Benjamin Nusz, representing Mid-
State Technical College
Staff:
• Adam Kuhn, Associate Planner
akuhn@stevenspoint.com
Parcel Number(s):
• 281240832202976
Zone(s):
• “B-3” Central Business District
Master Plan:
• Downtown District
Council District:
• District 1 | Ald. Christianson
Lot Information:
• Lot Size: 43,996 sq. ft. (1.01 ac.)
Current Use:
• Vacant Building
Applicable Regulations:
• 23.02(1)(c)(3)(d)
Request
1. Public Hearing and action on a request from Benjamin Nusz,
representing Mid-State Technical College, for a conditional use
permit to operate a technical college facility on the property
located at 1101 Centerpoint Drive (Parcel ID 281240832202976),
consistent with Ch. 23.02(1)(c)(3)(d).
Attachment(s)
1. Application
2. Plans
Findings of Fact
1. The City’s Redevelopment Authority has discussed a potential sale of
the subject property to Mid-State Technical College.
2. The proposed use of the existing building will be an educational
facility. The proposal will place education, workforce training,
student services, community programming, and related
administrative functions in the building.
3. Technical college facilities are a conditional use within the “B-3”
Central Business District, the zoning designation of the subject
property.
4. The Plan Commission and Common Council may attach additional
conditions onto the request as necessary.
Staff Recommendation
Approve the request for a conditional use permit to operate a technical
college facility on the property located at 1101 Centerpoint Drive (Parcel ID
281240832202976), subject to the following conditions:
1. A building permit shall be obtained prior to the start of construction.
2. Planned exterior improvements to the building shall be consistent
with the Historic Preservation / Design Review Commission’s Design
Guidelines, subject to the review and approval of the Commission
and/or Designated Agent.
3. Staff shall have the ability to approve minor modifications to the
proposed project plan.
Page 5 of 116
Page 2 of 8
Vicinity Map
Background
Overview: Mid-State Technical College proposes to adaptively reuse the existing building at 1101 Centerpoint Drive as an
educational facility and extension of the Mid-State’s Downtown Stevens Point Campus. The proposal will place
education, workforce training, student services, community programming, and related administrative functions in an
existing downtown building immediately adjacent to Mid-State's current campus. Phase one is expected to focus on
exterior improvements to match the exterior character of the currents Stevens Point Downtown Campus. Phase two will
focus on activating the interior spaces, which may include a large flexible meeting and training room, Workforce and
Economic Development offices, front-desk and office functions, and Mid-State signage and branding. Technical college
facilities are a conditional use within the “B-3” Central Business District, the zoning designation of the subject property.
Standards of Review – Conditional Use Permit
1. The establishment, maintenance, or operation of the use will not be detrimental to, or endanger the public
health, safety, morals, comfort, or general welfare.
Analysis: The proposed use is consistent with the City’s Comprehensive Plan and the existing surrounding uses
are unlikely to be negatively impacted by the proposed development. The surrounding neighborhood is located
within the City’s Downtown that provides a compatible land use intensity of commercial, retail and educational
uses. The subject property exceeds minimum lot size requirements. Additionally, utility and road infrastructure
exist to complement the planned future development of the subject property.
Findings: The “B-3” Central Business District allows for technical schools as a conditional use. While technical
schools are a conditional use within all City zoning districts, the purpose of the proposed development would be
to provide complementary uses with Mid-State’s Downtown Stevens Point Campus. Staff do not believe the
Page 6 of 116
Page 3 of 8
proposed conditional use permit with the conditions outlined above would be detrimental to, or endanger the
public health, safety, morals, comfort, or general welfare.
2. The use will not be injurious to the use and for the purpose already permitted, nor substantially diminish and
impair property values.
Analysis: According to the City’s Zoning Code, the intent of the “B-3” Central Business District is to “provide a
single contiguous district encompassing the central business district or downtown area which will encourage
primarily retail uses and a variety of supporting uses. This district is intended to help implement the
community's specialized development goals and planning principles, for the CBD, particularly the development
and maintenance of the downtown area as a specialized pedestrian-oriented shopping and community center.”
Findings: City staff believes that the proposed use is consistent with the “B-3” District. The planned activities are
consistent with institutional uses that are allowed within the “B-3” District, and such activities are intended to
be in operation during set hours and operated by professionals.
3. The establishment of the use will not impede the normal and orderly development and improvement of the
surrounding property for uses permitted in the district.
Analysis: The respective area is in an established and developed area of the city. The City’s Comprehensive Plan
identifies this area for commercial, retail and educational uses in a compact, pedestrian-oriented environment.
Findings: See standards one and two above. The subject property adjoins properties that are zoned “B-3”
Central Business and “B-2” Central Business Transition – zoning districts that also allow for technical college
facilities as a conditional use. As the subject property is considerably larger than most lots with a “B-3” zoning
designation, staff believes that the subject property and proposed use should not impact the existing
development surrounding the area and should not impede any future development.
4. The exterior architectural appeal and function plan of any proposed structure will not be variance with either
the exterior architectural appeal and function plan, and scale of the structures already constructed or in the
course of construction in the immediate neighborhood or in the character of the applicable district so as to
result in a substantial or undue adverse effect on the neighborhood.
Analysis: If the conditional use permit is granted, exterior improvements to the existing building are planned.
Exterior work is expected to include new windows, overhangs above selected doors, stone-clad architectural
elements, maroon cladding or covering on the existing main entrance awning, illuminated Mid-State
identification signage, and landscape improvements. The subject property is located within the Downtown
Design Review District, which requires exterior improvements to align with the City Historic Preservation /
Design Review Commission’s Design Guidelines. Some of the planned improvements can be reviewed by myself
as the Designated Agent for the Historic Preservation / Design Review Commission, while others need
Commission review.
Findings: This standard is met.
Page 7 of 116
Page 4 of 8
5. Adequate utilities, access roads, drainage and/or facilities have been, or are being, provided.
Analysis: Primary means of access is off of Third Street, and existing shared access agreements with adjacent
properties provide additional access from Strongs Avenue. Drainage areas are proposed primarily to the east of
the building.
Findings: This standard is met.
6. Adequate measures have been, or will be taken, to provide ingress and egress so designed to minimize traffic
congestion in the public streets.
Analysis: Two access points exist off of Third Street.
Findings: Staff believes that proposed driveways will not create access issues.
7. The proposed use is not contrary to the objectives of any duly adopted land use plan for the City of Stevens
Point and any of its components.
Page 8 of 116
Page 5 of 8
Analysis: The City’s
2005 Comprehensive
Plan Future Land Use
Map has identified this
property has identified
the subject property
for as part of the
Downtown District,
which is intended for
commercial, office,
retail and institutional
uses situated in a
compact development
pattern. The subject property is zoned “B-3” Central Business District. The “B-3” District is intended to “provide a
single contiguous district encompassing the central business district or downtown area which will encourage
primarily retail uses and a variety of supporting uses. This district is intended to help implement the
community's specialized development goals and planning principles, for the CBD, particularly the development
and maintenance of the downtown area as a specialized pedestrian-oriented shopping and community center.”
Findings: The proposed development is consistent with building mass and site intensity that is typically found
within the City’s Downtown and is consistent with providing coverage of community facilities within the city.
8. The use shall, in all other respects, conform to the applicable regulations of the district in which it is located,
except as such regulations may, in each instance, be modified pursuant to the recommendations of the Plan
Commission.
Analysis: The conditional use permit application is seeking to operate an instructional facility as part of Mid-
State Technical College. Key land use requirements are met and are outlined throughout this report.
Findings: The regulations of the district are met for this proposal provided that the conditional use permit’s
conditions are met.
9. The proposal will not result in result in an over-concentration of high-density living facilities in one area so as
to result in a substantial or undue adverse effect on the neighborhood, on the school system, and the social
and protective systems of the community.
Analysis: N/A
Findings: N/A
10. Principal: Applications for exclusive multifamily residential uses: The view from the street should maintain a
residential character. The view should be dominated by the building and not by garages, parking, mechanical
equipment, garbage containers, or other storage.
Analysis: N/A
Subject Property
Page 9 of 116
Page 6 of 8
Findings: N/A
11. Principal: Access to the site shall be safe.
a) All developments shall front on a public right-of-way unless recommended by the Public Works
Director.
Analysis: The proposed development will have access off of Third Street.
Finding: This standard is met.
b) The driveway to the site shall be located so as not to be a danger to the street flow of traffic.
Analysis: Two driveways are proposed off of Third Street and can handle expected traffic generation.
Findings: This standard is met.
c) The driveway shall not be too close to neighboring intersections.
Analysis: The closest street intersection is roughly 10’ away from the intersection of Third Street and
Centerpoint Drive. This intersection is existing.
Findings: While the aforementioned driveway fails to meet the 100’ separation requirement from the
Third Street-Centerpoint Drive intersection, said driveway is considered legal nonconforming. Other
driveways serve the proposed use to aid in adequate traffic flow in and out of the subject property.
d) Alignment of the driveway shall be coordinated with adjacent access points to avoid conflict or
confusion.
Analysis: Proposed driveways are evenly separated along Third Street.
Findings: This standard is met.
e) Only one driveway shall be allowed per site unless recommended by the Public Works Director. Two
family units may be allowed more than one driveway if those driveways are separated by not less
than 10 feet. Maximum driveway openings shall be 20 feet (each).
Analysis: One driveway serves the subject property, with additional driveways being located off-site via
the shared parking lot.
Findings: This standard is met.
f) The organization of traffic flow on-site and between the site and the street shall be organized in a
clear hierarchy of flow patterns. Internal and external areas where traffic flow changes directions or
creates intersections shall be organized at clear intersections and those intersections are spaced far
Page 10 of 116
Page 7 of 8
enough apart so as to not cause confusion or problems and to provide for adequate spacing for
waiting vehicles.
Analysis: Parking areas are located to the north and south of the building to provide separate means of
traffic flow for the subject property.
Findings: This standard is met.
g) Intersections are visible and not visually screened.
Analysis: Intersections are visible as required in the City’s clearview requirements.
Findings: This standard is met.
h) Adequate drainage and snow storage is provided.
Analysis: A drainage area exists to the east of the building that can also serve as a snow storage area.
Findings: This standard is met.
i) Minimum size requirements are maintained for safe vehicle circulation.
Analysis: Minimum dimensional standards for driveways and internal roads are met.
Findings: This standard is met.
j) Parking areas shall be safe. They shall be adequately lit, sized to meet minimum standards, graded so
as to not be too steep, and paved with concrete, brick, or bituminous surfacing. The light source shall
not be visible from adjacent properties. Lighting shall be developed in such a way to minimize light
straying onto adjacent properties.
Analysis: The proposed parking areas meet minimum dimensional standards as outlined in the City’s
Zoning Code. Lighting is located within the parking areas and is visible from adjacent properties in part
due to it being a shared parking lot.
Findings: This standard is met.
k) Driveways shall be located to minimize the impact to adjacent properties.
Analysis: Please see above.
Findings: This standard is met.
11. There shall be adequate utilities to serve the site.
Page 11 of 116
Page 8 of 8
a. The Public Works Director, Police Chief and Fire Chief shall determine whether there is adequate
sanitary sewer, portable water, storm drainage, street capacity, emergency access, public protection
services, and other utilities to serve the proposed development. They shall review the plan to ensure
safety and access for safety vehicles.
Analysis: The property currently has water and sewer connections.
Findings: This standard is met.
13. The privacy of the neighboring development and the proposed development shall be maintained as much as
practical. Guidelines:
a. Mechanical equipment including refuse storage shall be screened from neighboring properties.
Analysis: Refuse storage is located to the southeast of the building.
Findings: This standard is met.
b. Lighting shall be located to minimize intrusion onto neighboring properties.
Analysis: Outside of light coming from the building and parking lot, no additional lighting that impacts
the surrounding area is proposed.
Findings: This standard is met.
c. Sources of noise shall be located in a manner that minimizes impact to neighboring properties.
Analysis: The use will be operating within the confines of the building and property.
Findings: The use should not create excessive noise.
14. Principal – Applications for exclusive multi-family residential uses. Landscaping shall be provided, or existing
landscape elements shall be preserved to maintain a sense of residential character, define boundaries, and to
enhance the sense of enclosure and privacy.
Analysis: N/A
Findings: N/A
Based on the findings above, staff would recommend approval of the conditional use permit with the conditions
outlined on page one. Please keep in mind that State legislation has placed limitations on local jurisdictions regarding
the denial of conditional use permits. Conditional use permits shall be reviewed by a means to permit a use under
certain conditions applied to the use or property. For example, if a concern is raised regarding to a standard above, a
condition can be applied to the permit to address the concern and grant the permit.
Page 12 of 116
Page 13 of 116
Page 14 of 116
Page 15 of 116
Page 16 of 116
Page 1 of 8
Administrative Staff Report
Department of Community
Development
Conditional Use Permit
2343 Ellis Street
September 8, 2026
Applicant(s):
• Christy Harris
Staff:
• Adam Kuhn, Associate Planner
akuhn@stevenspoint.com
Parcel Number(s):
• 281240833201902
Zone(s):
• “R-2” Single-Family Residential
Master Plan:
• Residential
Council District:
• District 3 | Ald. Keymer
Lot Information:
• Lot Size: 10,311 sq. ft. (0.24 ac.)
Current Use:
• Day care facility
Applicable Regulations:
• 23.02(1)(b)(3)(e)
Request
1. Public Hearing and action on a request from Christy Harris for a
conditional use permit to operate a large group day care center on
the property located at 2343 Ellis Street (Parcel ID
281240833201902), consistent with Ch. 23.02(1)(b)(3)(e).
Attachment(s)
1. Application
2. Plans
Findings of Fact
1. The applicant is requesting a conditional use permit to increase the
occupancy of an existing day care facility from eight individuals to
twelve individuals.
2. This proposal stems from a recent change by the State of Wisconsin
to increase the allowed occupancy for day care facilities from eight
to twelve individuals.
3. The applicant manages the existing day care facility and maintains
prerequisite State licensing for a day care facility.
4. Large group day care facilities, defined in the City’s Zoning Code as
providing care and supervision for more than eight individuals
regardless of age, is a conditional use within the “R-2” Single-Family
Residence District.
5. The Plan Commission and Common Council may attach additional
conditions onto the request as necessary.
Staff Recommendation
Approve the request for a conditional use permit to operate a large group
day care center on the property located at 2343 Ellis Street (Parcel ID
281240833201902), subject to the following conditions:
1. The day care facility shall maintain applicable licensing from County
and State agencies.
2. The maximum occupancy of the day care facility shall be 12
individuals.
3. City staff shall have the ability to approve minor amendments to the
project proposal.
Page 17 of 116
Page 2 of 8
Vicinity Map
Background
Overview: The applicant is requesting a conditional use permit to increase the occupancy of an existing day care facility
from eight individuals to twelve individuals. This proposal stems from a recent change by the Wisconsin Department of
Safety and Professional Services to increase the occupancy allowed for day care facilities from eight to twelve
individuals. The applicant manages the existing day care facility and maintains prerequisite State licensing for a day care
facility. Large group day care facilities, defined in the City’s Zoning Code as providing care and supervision for more than
eight individuals regardless of age, is a conditional use within the “R-2” Single-Family Residence District.
Standards of Review – Conditional Use Permit
1. The establishment, maintenance, or operation of the use will not be detrimental to, or endanger the public
health, safety, morals, comfort, or general welfare.
Analysis: The proposed use is consistent with the City’s Comprehensive Plan and the existing surrounding uses
are unlikely to be negatively impacted by the proposed development. Day care facilities are allowed within all
City residential zoning districts, and smaller day care facilities like what is proposed tends to be operated out of
an existing dwelling unit. The surrounding neighborhood consists of single-family homes with a higher density
pattern than other parts of the city. Utility and road infrastructure already exist to support the current day care
Page 18 of 116
Page 3 of 8
facility, and an increased occupancy of four individuals does not trigger the need for additional capital
infrastructure.
Findings: The “R-2” District permits large group day care centers via a conditional use permit. Day care centers
providing care and supervision for 4-8 individuals are permitted by right in the “R-2” District (defined as a family
day care center). Staff do not believe the proposed conditional use permit with the conditions outlined above
would be detrimental to, or endanger the public health, safety, morals, comfort, or general welfare.
2. The use will not be injurious to the use and for the purpose already permitted, nor substantially diminish and
impair property values.
Analysis: Small day care facilities are commonly located within defined residential neighborhoods like where the
subject property is located. As day care facilities are allowed in residential zoning district – the exact occupancy
triggering the distinction between permitted versus conditional – staff believes that the proposed use is
consistent with uses allowed within the “R-2” District.
Findings: This standard is met.
3. The establishment of the use will not impede the normal and orderly development and improvement of the
surrounding property for uses permitted in the district.
Analysis: The respective area is in an established and developed area of the city. The City’s Comprehensive Plan
identifies this area for residential development.
Findings: See standards one and two above. The subject property is located along a transition zone with denser
residential development located to the west and zoned “R-3” Single- and Two-Family Residential. Staff believe
that the subject property and proposed use should not impact the existing development surrounding the area
and should not impede any future development.
4. The exterior architectural appeal and function plan of any proposed structure will not be variance with either
the exterior architectural appeal and function plan, and scale of the structures already constructed or in the
course of construction in the immediate neighborhood or in the character of the applicable district so as to
result in a substantial or undue adverse effect on the neighborhood.
Analysis: The residence on the subject property has the design of Old Style architectural appeal that is common
among residential construction in this part of the city. The residence is 1 ½ stories in height and has white siding
with brick accents by the front porch. Six bedrooms are in the residence.
Findings: No improvements to the exterior of the residence are proposed to change as part of this conditional
use permit request. The residence has an architectural appeal that is consistent with other homes in the near
vicinity.
5. Adequate utilities, access roads, drainage and/or facilities have been, or are being, provided.
Analysis: Access into the subject property is off of Ellis Street. A large back and side yard exists off of Michigan
Avenue that provides adequate drainage.
Findings: This standard is met.
Page 19 of 116
Page 4 of 8
6. Adequate measures have been, or will be taken, to provide ingress and egress so designed to minimize traffic
congestion in the public streets.
Analysis: One driveway roughly 90 feet deep exists with access off of Ellis Street, with on-street parking also
available off of Ellis Street.
Findings: Staff believe that the configuration of the driveway is adequate to support the occupancy of four
additional persons.
7. The proposed use is not contrary to the objectives of any duly adopted land use plan for the City of Stevens
Point and any of its components.
Analysis: The
City’s 2005
Comprehensive
Plan Future Land
Use Map has
identified this
property has
identified the
subject property
as ‘Residential.’
The subject
property is zoned
“R-2” Single-
Family Residential, which is
intended “to provide the
population density and
used primarily for single
family living, which is
expected to accommodate
the numerous residential
developments already at
the density of this district,
and this district would
accommodate other
housing not on City sewer.
This district is to be located
consistent with the City's Comprehensive Plan.”
Findings: The proposed land use is consistent with the City’s Comprehensive Plan for providing a small-scale day
care facility within residential neighborhoods that provide the least amount of disruption to neighboring
property owners and land uses.
Subject Property
Subject Property
Page 20 of 116
Page 5 of 8
8. The use shall, in all other respects, conform to the applicable regulations of the district in which it is located,
except as such regulations may, in each instance, be modified pursuant to the recommendations of the Plan
Commission.
Analysis: The conditional use permit application is seeking to expand the occupancy of an existing day care
facility from eight to twelve individuals.
Findings: The regulations of the district are met with this proposal provided that the conditional use permit’s
conditions are met.
9. The proposal will not result in result in an over-concentration of high-density living facilities in one area so as
to result in a substantial or undue adverse effect on the neighborhood, on the school system, and the social
and protective systems of the community.
Analysis: N/A
Findings: N/A
10. Principal: Applications for exclusive multifamily residential uses: The view from the street should maintain a
residential character. The view should be dominated by the building and not by garages, parking, mechanical
equipment, garbage containers, or other storage.
Analysis: N/A
Findings: N/A
11. Principal: Access to the site shall be safe.
a) All developments shall front on a public right-of-way unless recommended by the Public Works
Director.
Analysis: The proposed use has access off of Ellis Street.
Finding: This standard is met.
b) The driveway to the site shall be located so as not to be a danger to the street flow of traffic.
Analysis: The driveway is positioned roughly 70 feet from the intersection of Michigan Avenue and Ellis
Street. One driveway is located immediately west of the subject property that is also owned by the
applicant.
Findings: The existing driveway is not anticipated to be a danger to traffic flow along adjacent streets.
c) The driveway shall not be too close to neighboring intersections.
Page 21 of 116
Page 6 of 8
Analysis: The driveway is positioned roughly 70 feet from the intersection of Michigan Avenue and Ellis
Street and maintains the minimum 20 feet of separation that is needed.
Findings: This standard is met.
d) Alignment of the driveway shall be coordinated with adjacent access points to avoid conflict or
confusion.
Analysis: No driveways exist on the north side of Ellis Street immediately in front of the subject
property. Adequate driveway separation exists between neighboring lots on the south side of Ellis
Street.
Findings: This standard is met.
e) Only one driveway shall be allowed per site unless recommended by the Public Works Director. Two
family units may be allowed more than one driveway if those driveways are separated by not less
than 10 feet. Maximum driveway openings shall be 20 feet (each).
Analysis: One driveway serves the subject property.
Findings: This standard is met.
f) The organization of traffic flow on-site and between the site and the street shall be organized in a
clear hierarchy of flow patterns. Internal and external areas where traffic flow changes directions or
creates intersections shall be organized at clear intersections and those intersections are spaced far
enough apart so as to not cause confusion or problems and to provide for adequate spacing for
waiting vehicles.
Analysis: The existing driveway provides adequate traffic flow to and from the subject property.
Findings: This standard is met.
g) Intersections are visible and not visually screened.
Analysis: Intersections are visible as required in the City’s clearview requirements.
Findings: This standard is met.
h) Adequate drainage and snow storage is provided.
Analysis: A drainage area exists to the east of the building that can also serve as a snow storage area
Findings: This standard is met.
i) Minimum size requirements are maintained for safe vehicle circulation.
Page 22 of 116
Page 7 of 8
Analysis: Minimum dimensional standards for the driveway are met.
Findings: This standard is met.
j) Parking areas shall be safe. They shall be adequately lit, sized to meet minimum standards, graded so
as to not be too steep, and paved with concrete, brick, or bituminous surfacing. The light source shall
not be visible from adjacent properties. Lighting shall be developed in such a way to minimize light
straying onto adjacent properties.
Analysis: The driveway, along with available on-street parking off of Ellis Street, meets minimum parking
requirements per the City’s Zoning Code. Lighting that is provided would come off of the residence.
Findings: This standard is met.
k) Driveways shall be located to minimize the impact to adjacent properties.
Analysis: Please see above.
Findings: This standard is met.
11. There shall be adequate utilities to serve the site.
a. The Public Works Director, Police Chief and Fire Chief shall determine whether there is adequate
sanitary sewer, portable water, storm drainage, street capacity, emergency access, public protection
services, and other utilities to serve the proposed development. They shall review the plan to ensure
safety and access for safety vehicles.
Analysis: The property currently has water and sewer connections.
Findings: This standard is met.
13. The privacy of the neighboring development and the proposed development shall be maintained as much as
practical. Guidelines:
a. Mechanical equipment including refuse storage shall be screened from neighboring properties.
Analysis: Refuse storage is located within the residence.
Findings: This standard is met.
b. Lighting shall be located to minimize intrusion onto neighboring properties.
Analysis: Lighting that is provided would come off of the residence.
Findings: This standard is met.
Page 23 of 116
Page 8 of 8
c. Sources of noise shall be located in a manner that minimizes impact to neighboring properties.
Analysis: The use will be operating within the confines of the building and property.
Findings: The use should not create excessive noise.
14. Principal – Applications for exclusive multi-family residential uses. Landscaping shall be provided, or existing
landscape elements shall be preserved to maintain a sense of residential character, define boundaries, and to
enhance the sense of enclosure and privacy.
Analysis: N/A
Findings: N/A
Based on the findings above, staff would recommend approval of the conditional use permit with the conditions
outlined on page one. Please keep in mind that State legislation has placed limitations on local jurisdictions regarding
the denial of conditional use permits. Conditional use permits shall be reviewed by a means to permit a use under
certain conditions applied to the use or property. For example, if a concern is raised regarding to a standard above, a
condition can be applied to the permit to address the concern and grant the permit.
Page 24 of 116
Page 25 of 116
Page 26 of 116
From: Christy Harris
To: District 3
Cc: Adam Kuhn
Subject: CUP Little Hands Learning Center
Date: Wednesday, July 22, 2026 8:33:31 PM
Dear Alderperson,
Thank you for taking the time to review my Conditional Use Permit application.
I am requesting approval to increase the licensed capacity of my existing family child
care program from eight (8) children to twelve (12) children.
My daycare has been operating successfully while providing a safe, nurturing, and
structured environment for children and their families. This request is intended to allow
me to serve a few additional families in our community while continuing to provide the
same high-quality care and maintaining compliance with all state licensing requirements.
The proposed increase is not expected to result in any significant changes to the
character of the neighborhood. The daycare will continue to operate within its current
location and business hours, and I do not anticipate a noticeable increase in traffic, noise,
or parking demands beyond what currently exists.
As a licensed child care provider, I remain committed to maintaining a safe, respectful,
and well-managed environment for the children in my care while being a considerate
neighbor and member of the community.
I appreciate your consideration of my request and your support throughout the
Conditional Use Permit process. Please don’t hesitate to contact me if you have any
questions or would like any additional information.
Sincerely,
Christy Harris
Owner of Little Hands Learning Center
2343 Ellis St
Stevens point, WI 54481
715-347-4620
Page 27 of 116
Page 1 of 5
Administrative Staff Report
Department of Community
Development
Final Subdivision Plat Review
West River Drive & West Zinda Drive
September 8, 2026
Applicant(s):
• Bill Pritchard, representing the
Elizabeth Revocable Trust
Staff:
• Adam Kuhn, Associate Planner
akuhn@stevenspoint.com
Parcel Number(s):
• 281240831401241
• 281240831401211-
281240831401226
Zone(s):
• “R-2” Single-Family Residential
Master Plan:
• Residential
• Not Developable / Restrictive
Ownership
Council District:
• District 9 – Ald. Lang
Lot Information:
• 18 lots
Current Use:
• Vacant
Applicable Regulations:
• Ch. 20.05(2)
Request
1. Public Hearing and action on a request from Bill Pritchard,
representing the Elizabeth Revocable Trust, for a final subdivision
plat review on an unaddressed parcel bounded by West Zinda Drive
(Parcel ID 281240831401241) and Lots 1-15 of the Riverwood West
Subdivision (Parcel ID 281240831401211-281240831401226),
consistent with Ch. 20.05(2).
Attachment(s)
1. Application
2. Plat
Findings of Fact
1. The applicant is requesting a final subdivision plat review for a
proposed subdivision located between West River Drive and West
Zinda Drive.
2. The land division includes 1.) a replating of a Council-approved
undeveloped subdivision off of West River Drive and 2.) the
subdividing of an undeveloped parcel immediately west of the
platted subdivision.
3. Proposed lots range from slightly over 10,000 sq ft in size to over
151,705 sq ft in size.
4. The subject area has been delineated for wetlands, and the
delineated wetland areas are overlayed on the final plat.
5. Access to the lots would be off of two separate access points. 13 lots
would be off of a proposed cul-de-sac extending from West River
Drive, while 5 lots would be off of a public street extending from
West Zinda Drive. One proposed lot would not have street access as
it is designated as undevelopable.
6. The subject area is zoned “R-2” Single-Family Residential and has a
dual future land use designation of ‘Residential’ and ‘Not
Developable / Restrictive Ownership.’
7. The creation of five or more lots requires the Common Council to
approve both a preliminary plat review and a final plat review.
Staff Recommendation
Approve the final subdivision plat review on an unaddressed parcel bounded
by West Zinda Drive (Parcel ID 281240831401241) and Lots 1-15 of the
Page 28 of 116
Page 2 of 5
Riverwood West Subdivision (Parcel ID 281240831401211-
281240831401226), subject to the following conditions:
1. The future land use designation for Parcel ID 281240831401241 shall
be amended from ‘Not Developable / Restrictive Ownership’ to
‘Residential.’
Vicinity Map
Background
The applicant is requesting a final subdivision plat review for a proposed subdivision located between West River Drive
and West Zinda Drive. The attached subdivision includes 1.) a replating of a Council-approved undeveloped subdivision
off of West River Drive and 2.) the subdividing of an undeveloped parcel immediately west of the platted subdivision.
Consistent with the City’s Subdivision Ordinance, the subdividing of land creating five or more lots requires a preliminary
and final subdivision plat to be approved by the Plan Commission and Common Council.
Access: Two separate roads/streets are planned to provide access to the subject area. Lots 1-6 & 12-18 would be
accessed off of a proposed street extending off of West River Drive. This public street is already platted – however, the
directionality of the street is proposed to change as part of this plat. Consistent with Wis. Stats. 66.1003(4), the existing
platted right-of-way would need to be vacated, which triggers a lengthy review process including two separate actions
Page 29 of 116
Page 3 of 5
by the Common Council. Lots 7-11 are proposed to be accessed off of West Zinda Drive. This public street will also
terminate into a cul-de-sac. Outlot 2 is identified as an undevelopable outlot and would not have street frontage.
Utilities: Utility infrastructure would be installed underneath the proposed public street and private driveway, servicing
the 18 developable lots.
Zoning and Land Use: If the subdivision plat is approved, the property owner intends to build single-family homes. The
subject area is zoned “R-2” Single-Family Residential, which permits single-family development by right. The City’s
Future Land Use Map identifies the area where Lots 1-6 & 12-18 are proposed for residential use. Where Lots 7-11 are
proposed, however, the Future Land Use Map identifies the area as ‘Not Developable / Restrictive Ownership.’ This
designation was likely due to most of the land being identified with hydric soils. As a wetland delineation has been
conducted for this area, the results may substantiate the need for a Future Land Use Map amendment.
Standards of Review
A preliminary plat or final plat of any major or minor subdivision in the City of Stevens Point or in the extraterritorial area
shall not be approved unless the Plan Commission and the Common Council determine that adequate public facilities and
public services are available to support and service the area of the proposed subdivision, unless the City finds the major
or minor plat are in an area not likely to be included in the City’s future growth zone. In considering the questions of
adequacy of public facilities and public services as set forth above, the Plan Commission and Common Council shall
consider but not be limited to:
Final Subdivision Plat
Page 30 of 116
Page 4 of 5
1. The nature, extent and size of the proposed subdivision and its impact in terms of the estimated increase in
population expected to result.
Analysis: The subject area includes 18 lots that are proposed for single-family residential development.
Proposed lots range from slightly over 10,000 sq ft in size to over 151,000 sq ft in size. Some of the proposed lots
have significant wetland areas, which will impact the true area where land development would be permitted.
Developable areas range from 8,453 sq ft per lot to slightly under 30,000 sq ft. Please note that there are
additional limitations for the placement of structures directly below the overhead power lines, which will limit
developable areas and building placement.
Findings: US Census household size in Stevens Point is 2.10 persons per household. If the subdivision was 100%
occupied, we could expect an additional 38 persons to reside in the proposed subdivision. The City’s 2023
estimated population was 25,752 persons. With the proposed subdivision, a .15% population increase could be
reasonably expected. Existing public infrastructure, along with the new street, utilities and fire hydrants, can
reasonably handle this type of increase.
2. The present or projected state of development likely to result when said subdivision is developed with
projected densities as anticipated by adopted area Comprehensive Plans and currently approved subdivisions
in the immediate vicinity of the proposed subdivision.
Analysis: The proposed subdivision provides low-density residential development on the city’s west side.
Findings: Long-term cost for the City does exist with the proposed subdivision having access via a public street.
Given the tax revenues tied to this development, staff believes that sufficient lot density exists so that revenues
are on par with expected expenditures.
3. The avoidance of expenditures of public funds necessitated by the proposed subdivision which are not in
adopted capital or operating budgets. For subdivisions in the City of Stevens Point, the applicant shall furnish
data requested by the Director of Public Works, Water Utility Manager, Traffic Engineer and Director of
Planning and Development who will coordinate statements of adequacy for transportation, storm sewer,
sanitary sewer, water service, fire and police protection, parks, open space, and recreation and school
facilities for the Plan Commission and the Common Council.
Analysis: The City will not be constructing the planned public street. Rather, the construction of that
infrastructure, along with proposed water and sewer laterals, will be financed and constructed by the applicant.
Therefore, up-front City expenditures for this proposed subdivision are expected to be minimal. Additional long-
term expenditures in maintenance costs for the street and multi-use path are anticipated, however such
expenditures will be financed by the additional tax revenue coming from the 18 single-family homes.
Findings: Estimated infrastructure costs, projected property tax revenue, and utility users provide sufficient
financial capacity for the subdivision over the life of the proposed infrastructure.
Page 31 of 116
Page 5 of 5
Exhibits
Subject Area
Page 32 of 116
Page 33 of 116
Page 34 of 116
S73°58'35"E15.06'
LOT 1819,382 SQ. FT.LOT 1723,845 SQ. FT.
LOT 1610,513 SQ. FT.
LOT 518,714 SQ. FT.LOT 415,509 SQ. FT.LOT 317,177 SQ. FT.LOT 223,436 SQ. FT.LOT 132,139 SQ. FT.
LOT 660,083 SQ. FT.
LOT 1239,319 SQ. FT.
LOT 1161,645 SQ. FT.LOT 1318,817 SQ. FT.
OUT LOT 2148,321 SQ. FT.
LOT 7151,475 SQ. FT.
LOT 869,111 SQ. FT.
N89°55'51"E 616.95'
S15°57'56"W 325.06' (325.35)N73°59'32"W 150.25'(150.00')
S15°52'37"W 408.37'N73°58'35"W 586.91'S66°21'36"W 187.62'S66°13'58"W102.70'N87°31'52"W 254.50'S89°57'05"W 175.09'(175.16')
(176.45')N89°57'05"E 176.40'(121.95')S87°31'52"E122.00'
N00°10'01"W 736.11' (736.15')
N89°32'11"E 245.22' (245.02')
N00°02'30"W60.00' S00°22'28"W22.37'
C1 (C1)155.85'(156.04')272.65'155.72'
112.99'
66.00'
146.07'
136.82'
271.55'
540.37'
195.74'
S42°11'01"E 308.27'
N70°50'01"W 385.70'N08°47'38"E 162.75'
N16°14'06"E 414.08'N29°37'17"W 420.27'
N55°41'16"E 349.80'
112.66'50.09'
222.79'
N30°50'01"W 221.41'N00°50'01"W 177.62'
N29°09'59"E 162.44'N59°09'59"E 217.46'N70°24'22"E 317.78'S79°09'59"W 223.12'
S49°09'59"W 177.48'
S32°24'14"W 298.28'170.00'83.26'S19°10'24"E
ARC = 158.72'
32.73'ARC = 105.36'ARC = 154.37'
ARC = 80.33'ARC =47.12'
LOT 1521,831 SQ. FT.
N89°37'50"E 2666.38'
WEST RIVER DRIVE
WEST ZINDA DRIVE
SW-SE
GOV'T.LOT 4
LEGENDEXISTING 3/4" REBARFOUND GOVERNMENT MONUMENT AS NOTED
SET 1 1/4" X 18" REBAR, WEIGHING 4.30 LBS/LIN FTEXISTING 1 1/4" O.D. IRON PIPEALL OTHER LOT CORNERS SET WITH AEXISTING 1 1/4" REBAREXISTING 2 1/4" O.D. IRON PIPE1 1/4" OD X 18" IRON PIPE WEIGHING 1.68 LBS/LIN FT( ) RECORDED DISTANCE FROM PREVIOUS INSTRUMENT
LOT 1024.933 SQ. FT.N58°33'30"W 120.92'
PLEASANT COURT
S11°05'57"E 148.58'
S42°11'01"E 154.01'175.85'
122.43'
LOT 1418,408 SQ. FT.
92.92'
S87°31'52"E85.52'
S84°35'19"E117.00'LOT 914,750 SQ. FT.
S70°09'48"E 169.72'N70°09'48"W 169.72'
LOT 1CSM #9448-40-78
50'ROW
66'ROW
60'ROW 66'ROW
90'RAD.
63'RAD.
UNPLATTEDLANDS
LOT 1CSM #1-154UNPLATTEDLANDS
LOT 2CSM #3257-11-215LOT 1CSM #3226-11-184LOT 4CSM #9082-38-12LOT 3CSM #9082-38-12
LOT 1CSM #9399-40-29LOT 1CSM #8775-36-5
30'
100'
ASTER COURTN24°09'32"W31.28'
N00°22'28"E529.81'
1312.58' 1135.30'
POB
O.L. 1 CSM #5925-21-241
C2C3ARC = 121.21'
ARC =53.99'ARC =44.91'ARC =38.16'
ARC =66.84'C4
ARC =47.53'
ARC =46.66'
ARC =47.12'ARC =47.12'ARC =45.80'C7
ARC =63.30'ARC =47.12'ARC =47.14'ARC =58.99'C8C9
C5C6 L1L2L3L4L5
L6L7 L8 L985.48'71.12'
68.37'59.78'
N58°40'12"E 239.01'
S42°11'01"E 156.60'
S57°56'08"E 166.48'15' WIDEDRAINAGEEASEMENT 20' WIDEDRAINAGEEASEMENT
RIVERWOODWESTSUBDIVISIONLOT 2CSM #9448-40-78
LOT 2CSM #9448-40-78
WEST LINE OF GOVERNMENT LOT 4
ROW50,793 SQ. FT.
100'66'ROW
CANADIAN NATIONALRAILROADNW-SEGOV'T.LOT 3
DEDICATED TOTHE PUBLIC
DEDICATED TOTHE PUBLICOL 1CSM #8051-31-31
CITY
STEVENS
OF
POINT
UTILITYEASEMENTDOC. #620095
UTILITYEASEMENTDOC. #499429
20' UTILITYEASEMENTDOC. #287251100' UTILITY EASEMENTSEE SURVEYOR'S NOTE
218.50'1353.80'
S18°47'36"W 215.49'
ROW51,489 SQ. FT.5' WIDE TRAIL EASEMENT(GREEN CIRCLE TRAIL)
28.00'S32°24'14"W 304.06'134.06'CENTERLINE OF 100'UTILITY EASEMENTN66°15'09"E 937.88'20'
O. L. 1
20' WIDE TRAIL EASEMENT(GREEN CIRCLE TRAIL)N06°36'01"E 128.15'
20' UTILITYEASEMENTDOC. #287251
SURVEYOR'S CERTIFICATEI, AARON PARKS, PROFESSIONAL LAND SURVEYOR S-2861, DOHEREBY CERTIFY THAT UNDER THE DIRECTION OF BILL PRICHARD, IHAVE SURVEYED, DIVIDED, AND MAPPED REPLAT OF RIVERWOODWEST SUBDIVISION, BEING ALL OF RIVERWOOD WEST SUBDIVISIONAND THAT PART OF LOT 2 OF CERTIFIED SURVEY MAP #9448-40-78LOCATED IN GOVERNMENT LOT 4, AND ALL OF OUT LOT 1 OFCERTIFIED SURVEY MAP #8051-31-31 AND THAT PART OF LOT 2 OFCERTIFIED SURVEY MAP #9448-40-78 LOCATED IN THE SOUTHWEST 1/4OF THE SOUTHEAST 1/4, ALL IN SECTION 31, TOWNSHIP 24 NORTH,RANGE 8 EAST, CITY OF STEVENS POINT, PORTAGE COUNTY,WISCONSIN.THAT SUCH PLAT IS A CORRECT REPRESENTATION OF ALL OF THEEXTERIOR BOUNDARIES OF THE LAND SURVEYED AND THESUBDIVISION THEREOF MADE.THAT I HAVE FULLY COMPLIED WITH THE PROVISIONS OF CHAPTER236 OF THE WISCONSIN STATUTES AND THE PROVISIONS OF THESUBDIVISION ORDINANCE OF THE CITY OF STEVENS POINT,WISCONSIN, IN SURVEYING, DIVIDING AND MAPPING THE SAME.DATED THIS 23RD DAY OF JULY, 2026.___________________________________AARON PARKSPROFESSIONAL LAND SURVEYOR S-2861
REPLAT OF RIVERWOOD WEST SUBDIVISIONA SUBDIVISION PLAT OF REPLAT OF RIVERWOOD WEST SUBDIVISION, BEING ALL OF RIVERWOOD WEST SUBDIVISION AND THAT PART OF LOT 2 OF CSM #9448-40-78 LOCATED IN GOVERNMENT LOT 4, AND ALL OFOUT LOT 1 OF CSM #8051-31-31 AND THAT PART OF LOT 2 OF CERTIFIED SURVEY MAP #9448-40-78 LOCATED IN THE SOUTHWEST 1/4 OF THE SOUTHEAST 1/4, ALL IN SECTION 31, TOWNSHIP 24 NORTH, RANGE 8 EAST,CITY OF STEVENS POINT, PORTAGE COUNTY, WISCONSIN.
SCALE: 1"=80'160'0' 80'
BEARINGS REFERENCED TO THE SOUTH LINE OFTHE SE1/4 OF SECTION 31, T24N, R8E, HAVING AGRID BEARING OF N 89°37'50" E, PER THEWISCONSIN COUNTY COORDINATE SYSTEM,PORTAGE COUNTY, NAD83(2011).BASE FOR BEARING
FORWARD
There are no objections to this plat with respect to Secs. 236.15, 236.16, 236.20 and 236.21(1) and (2),Wis. Stats. as provided by s. 236.12, Wis. Stats.Certified __________________, 20_____Department of Administration
TYPICAL DRAINAGE EASEMENT WIDTH AS NOTED.SIDES OF EASEMENT ARE PARALLEL TO LOT LINESAND THEY SHALL LENGTHEN OR SHORTEN TOPROVIDE CONTINUITY.NOT TO SCALE
DRAINAGE EASEMENT NOTES
LOT LINE15'
DEVELOPER/OWNER:THE ELIZABETH REVOCABLE TRUSTco: BILL PRICHARD3364 COTTAGE HILL DRIVEGREEN BAY, WI 54311
SHEET 1 OF 2 SHEETS
7.5'7.5'
TYPICAL 12' UTILITY EASEMENT. SIDES OFEASEMENT ARE PARALLEL TO ROW LINES ANDTHEY SHALL LENGTHEN OR SHORTEN TO PROVIDECONTINUITY.NOT TO SCALEUTILITY EASEMENT NOTES
ROW LINE12'EASEMENT LINE
NO POLES OR BURIED CABLES ARE TO BE PLACEDSUCH THAT THE INSTALLATION WOULD DISTURBANY SURVEY STAKE OR OBSTRUCT VISION ALONGANY LOT LINE OR STREET LINE. THE DISTURBANCEOF A SURVEY STAKE BY ANYONE IS A VIOLATION OFs. 236.32 OF THE REVISED WISCONSIN STATUTES.UTILITY EASEMENTS AS HEREIN SET FORTH AREFOR THE USE OF PUBLIC BODIES AND PRIVATE ORPUBLIC UTILITIES HAVING THE RIGHT T0 SERVE THEAREA.THE UTILITY EASEMENTS INCLUDE THE RIGHT OFTHE UTILITY TO TRIM OR REMOVE ANY OR ALLTREES WITHIN THE EASEMENT WHICH WOULDINTERFERE WITH THE CONSTRUCTION ORMAINTENANCE OF THE UTILITY.
UTILITY EASEMENTS
LOT SIZESQ. FT.OUT LOT #18,433
TRTR31326524N8E23N8ETRTR31624N8E23N8E
PREPARED BY:AARON PARKS, PLS #2861GREMMER & ASSOCIATES, INC.120 WILSHIRE BLVD. NORTHSTEVENS POINT, WI 54481PHONE (715)341-4363
LOT 2 CSM#9920-43-100 OUT LOT 1 CSM#4329-15-124
SEE SHEET 2 OF 2 SHEETS FOR LINE AND CURVE TABLES.EXISTING 100' WIDE UTILITY EASEMENT, CENTERED ONPOWER POLES AS LAID OUT, DOCUMENT #181217 ANDDOCUMENT #183328.EXISTING 20' WIDE UTILITY EASEMENT, DOC. #287251 ISPARALLEL TO THE 100' UTILITY EASEMENT. THE NORTHLINE OF THE 20' EASEMENT IS THE CENTERLINE OF THE100' EASEMENT.SEE SHEET 2 OF 2 FOR DESCRIPTION OF EASEMENT FORTHE GREEN CIRCLE TRAIL THROUGH LOT 9 AND OUT LOT 2.
SURVEYOR'S NOTES
WESTCOTTAGESTWESTPLEASANT ST
W MCDONALD DRW MAPLERIDGE DRBRENT-WOODDRWBIRCHWOOD LN
WEST ZINDA DR
W TRILLIUMCT
VICINITY MAPDRAWING NOTTO SCALESUBJECTPARCEL
WEST RIVER DRCONCRETEMONUMENT NONMONUMENTED,IN RIVERTRTR31326524N8E23N8EMEANDER CORNER,2" IRON PIPE
LOT 10LOT 920'OUT LOT 1LOT 17LOT LINE
Page 35 of 116
LINE #BEARINGDISTANCEL1N74°05'35"W23.70'L2 47.50'L4 28.69'L3 63.85'N70°09'48"WL5 77.18'L6S70°09'48"E24.34'L7 145.38'L8 47.50'S65°40'43"WN70°09'48"WN70°09'48"WL9 23.77'S74°05'35"EN65°40'43"E
CURVE TABLELOTRADIUSARCLENGTHCHORDBEARINGCHORDLENGTH42879.93'498.77'S67°18'05"E498.15'2879.93'80.33'S71°27'50"E80.33'
183.00'59.54'S25°15'33"W59.28'67.00'47.04'S85°47'34"W46.08'
90.00'46.66'N04°01'03"E46.14'
CENTRALANGLEAH TANGENTBEARINGBEARING
18°38'33"
9°55'23"01°35'22"
40°13'43"
29°42'08"
BK TANGENTS72°15'47"E
N20°38'13"ES65°33'20"W
S34°34'50"W
S62°20'24"E
S88°55'31"E
S15°56'16"WN74°05'35"W
N70°09'48"W
S65°40'43"W
N65°40'43"E
CURVEC11
C4C5
322879.93'2879.93'105.36'154.37'158.72'S63°23'17"ES65°58'18"ES69°05'10"E105.35'154.35'158.69'02°05'46"03°04'16"03°09'27"63.00'325.10'S82°16'37"E67.08'863.00'121.21'S05°00'31"E103.36'110°14'12"9133.00'102.50'S87°45'27"W99.99'44°09'29"1690.00'497.91'N19°50'12"E66.00'43°01'13"1590.00'47.53'N85°58'14"W46.98'1490.00'47.14'N55°50'16"W46.60'30°00'30"30°15'27"690.00'63.30'N39°01'03"E62.00'40°17'52"590.00'47.12'N74°09'59"E46.59'30°00'00"490.00'47.12'S75°50'01"E46.59'
(498.54')(497.92')(C1)143.84'134.95'C2
1390.00'47.12'N25°50'01"W46.59'30°00'00"
(S67°04'30"E)2879.93'8117.00'N55°51'21"E70°26'15"C3 N50°06'35"W64°20'05"763.00'53.99'N84°40'34"E52.35'49°05'52"1163.00'44.91'S50°21'18"E43.96'40°50'26"1063.00'38.16'S12°34'57"E37.58'34°42'15"963.00'66.84'S35°09'45"W63.75'60°47'10"18C618 S65°40'43"WN70°09'48"WC7 S41°20'49"WS01°40'25"E90.00'58.99'S60°07'26"W57.94'37°33'14"12 30°00'00"90.00'47.12'S45°50'01"E46.59'290.00'45.80'S16°15'13"E45.31'29°09'36"167.00'51.64'N87°45'27"E50.37'44°09'29"1133.00'93.38'N85°47'34"E91.48'3 40°13'43"30°00'00"C8C9 S65°40'43"WS74°05'35"ES70°09'48"E
RESOLVED, THAT THE REPLAT OF RIVERWOOD WEST SUBDIVISION IN THE CITY OFSTEVENS POINT, THE ELIZABETH REVOCABLE TRUST, OWNER, IS HEREBY APPROVED BYTHE COMMON COUNCIL.APPROVED IN ACCORDANCE WITH THE CITY OF STEVENS POINT SUBDIVISIONORDINANCE THIS __________ DAY OF _______________, 2026. APPROVED BY ___________________________________________ MIKE WIZA, MAYORI HEREBY ATTEST, THAT THE FOREGOING IS A COPY OF A RESOLUTION ADAPTED BY THECOMMON COUNCIL OF THE CITY OF STEVENS POINT. ATTESTED BY_______________________________________________ SUSAN PAGEL, CLERK
AS OWNER, I HEREBY CERTIFY THAT I CAUSED THE LAND DESCRIBED ON THIS PLAT TO BE SURVEYED, DIVIDED, MAPPEDAND DEDICATED AS REPRESENTED ON THIS PLAT. I ALSO CERTIFY THAT THIS PLAT IS REQUIRED BY S.236.10 OR S.236.12 TOBE SUBMITTED TO THE FOLLOWING FOR APPROVAL OR OBJECTION: STATE OF WISCONSIN DEPARTMENT OF ADMINISTRATION CITY OF STEVENS POINTWITNESS THE HAND AND SEAL OF SAID OWNER THIS _____, DAY OF _______________, 2026.IN THE PRESENCE OF:____________________________________ ________________________OWNER (PRINT)OWNER (SIGNATURE)STATE OF WISCONSIN ) ) SSPORTAGE COUNTY ) PERSONALLY CAME BEFORE ME THIS _____ DAY OF _______________, 2026, THE ABOVE NAMED , TO ME KNOWN TO BE THEPERSON WHO EXECUTED THE FOREGOING INSTRUMENT AND ACKNOWLEDGED THE SAME._____________________________NOTARY PUBLIC, _______________, WISCONSINMY COMMISSION EXPIRES __________________.
OWNER'S CERTIFICATE OF DEDICATION
STATE OF WISCONSIN ) ) SSPORTAGE COUNTY ) I, COREY LADICK, BEING THE DULY ELECTED, QUALIFIED AND ACTING TREASURER OF THE CITY OF STEVENS POINT, DO HEREBY CERTIFY THATTHE RECORDS IN MY OFFICE SHOW NO UNREDEEMED TAX SALES AND NO UNPAID TAXES OR SPECIAL ASSESSMENTS AS OF ____________ , 2026,AFFECTING THE LANDS INCLUDED IN THE REPLAT OF RIVERWOOD WEST SUBDIVISION.____________ _______________________________DATE COREY LADICK, CITY TREASURER
CITY TREASURER'S CERTIFICATE
STATE OF WISCONSIN ) ) SSPORTAGE COUNTY ) I, SUSAN PAGEL, BEING THE DULY APPOINTED, QUALIFIED AND ACTING CITY CLERK OF THE CITY OF STEVENS POINT, DO HEREBY CERTIFYTHAT COPIES OF REPLAT OF RIVERWOOD WEST SUBDIVISION WERE FORWARDED ON THE ________DAY OF ________________, 2026 ASREQUIRED BY S. 236.12 (4) AND THAT NO OBJECTIONS TO THE PLAT HAVE BEEN FILED WITHIN THE 20-DAY LIMIT SET BY SUB. (3) OR, IF FILED,HAVE BEEN MET.____________ ________________________DATE SUSAN PAGEL, CLERK
COMMON COUNCIL RESOLUTION
CITY CLERK'S CERTIFICATE
STATE OF WISCONSIN ) ) SSPORTAGE COUNTY ) I, PAMELA PRZYBELSKI, BEING THE DULY ELECTED, QUALIFIED AND ACTING TREASURER OF THE COUNTY OF PORTAGE, DO HEREBY CERTIFYTHAT THE RECORDS IN MY OFFICE SHOW NO UNREDEEMED TAX SALES AND NO UNPAID TAXES OR SPECIAL ASSESSMENTS AS OF ____________ ,2026 AFFECTING THE LANDS INCLUDED IN THE REPLAT OF RIVERWOOD WEST SUBDIVISION.____________ ________________________________________DATE PAMELA PRZYBELSKI, COUNTY TREASURER
COUNTY TREASURER'S CERTIFICATE
UTILITY EASEMENT PROVISIONSAN EASEMENT FOR ELECTRIC, NATURAL GAS AND COMMUNICATIONS SERVICE IS HEREBY GRANTED BY:THE ELIZABETH REVOCABLE TRUST, GRANTOR, TOWISCONSIN PUBLIC SERVICE CORPORATION, A WISCONSIN CORPORATION, GRANTEE,AT&T TELECOMMUNICATIONS COMPANY, GRANTEE,CHARTER COMMUNICATIONS/SPECTRUM TELECOMMUNICATIONS COMPANY, GRANTEE ANDTDS METROCOM, GRANTEETHEIR RESPECTIVE SUCCESSORS AND ASSIGNS, TO CONSTRUCT, INSTALL, OPERATE, REPAIR, MAINTAIN AND REPLACE FROM TIME TO TIME,FACILITIES USED IN CONNECTION WITH OVERHEAD AND UNDERGROUND TRANSMISSION AND DISTRIBUTION OF ELECTRICITY AND ELECTRICENERGY, NATURAL GAS, TELEPHONE, CABLE TV AND FIBER OPTIC FACILITIES FOR SUCH PURPOSE AS THE SAME IS NOW OR MAY HEREAFTER BEUSED, ALL IN, OVER, UNDER, ACROSS, ALONG AND UPON THE PROPERTY SHOWN WITHIN THOSE AREAS ON THE PLAT DESIGNATED AS "UTILITYEASEMENT" AND THE PROPERTY DESIGNATED ON THE PLAT FOR STREETS AND ALLEYS, WHETHER PUBLIC OR PRIVATE, TOGETHER WITH THERIGHT TO INSTALL SERVICE CONNECTIONS UPON, ACROSS, WITHIN AND BENEATH THE SURFACE OF EACH LOT TO SERVE IMPROVEMENTS,THEREON, OR ON ADJACENT LOTS; ALSO THE RIGHT TO TRIM OR CUT DOWN TREES, BRUSH AND ROOTS AS MAY BE REASONABLY REQUIREDINCIDENTAL TO THE RIGHTS HEREIN GIVEN, AND THE RIGHT TO ENTER UPON THE SUBDIVIDED PROPERTY FOR ALL SUCH PURPOSES. THEGRANTEES AGREE TO RESTORE OR CAUSE TO HAVE RESTORED, THE PROPERTY, AS NEARLY AS IS REASONABLY POSSIBLE, TO THE CONDITIONEXISTING PRIOR TO SUCH ENTRY BY THE GRANTEES OR THEIR AGENTS. THIS RESTORATION, HOWEVER, DOES NOT APPLY TO THE INITIALINSTALLATION OF SAID UNDERGROUND AND/OR ABOVE GROUND ELECTRIC FACILITIES, NATURAL GAS FACILITIES, TELEPHONE AND CABLE TVFACILITIES OR FIBER OPTIC FACILITIES OR TO ANY TREES, BRUSH OR ROOTS WHICH MAY BE REMOVED AT ANY TIME PURSUANT TO THE RIGHTSHEREIN GRANTED. STRUCTURES SHALL NOT BE PLACED OVER GRANTEES' FACILITIES OR IN, UPON OR OVER THE PROPERTY WITHIN THE LINESMARKED "UTILITY EASEMENT" WITHOUT THE PRIOR WRITTEN CONSENT OF GRANTEES. AFTER INSTALLATION OF ANY SUCH FACILITIES, THEGRADE OF THE SUBDIVIDED PROPERTY SHALL NOT BE ALTERED BY MORE THAN SIX INCHES WITHOUT WRITTEN CONSENT OF GRANTEES. THISUTILITY EASEMENT PROVISION DOES NOT PREVENT OR PROHIBIT OTHERS FROM UTILIZING OR CROSSING THE UTILITY EASEMENT AS THE UTILITYEASEMENT(S) ARE NON-EXCLUSIVE.THE GRANT OF EASEMENT SHALL BE BINDING UPON AND INURE TO THE BENEFIT OF THE HEIRS, SUCCESSORS AND ASSIGNS OF ALL PARTIESHERETO.
EASEMENT FOR GREEN CIRCLE TRAILAN EASEMENT FOR THE CONSTRUCTION, MAINTENANCE AND USE OF A PUBLIC, MULTI-USE RECREATIONALTRAIL, TO BE SET FORTH FULLY ON A SEPARATE DOCUMENT, IS HEREBY GRANTED BY:THE ELIZABETH REVOCABLE TRUST, GRANTOR, TOGREEN CIRCLE TRAIL, INC., A WISCONSIN NONSTOCK CORPORATION, GRANTEETHE PROPERTY SUBJECT TO THIS EASEMENT IS DESCRIBED AS FOLLOWS:5' WIDE EASEMENT IN LOT 9 COMMENCING AT THE SOUTHWEST CORNER OF LOT 9, THE POINT OF BEGINNING OF A 5' WIDE EASEMENT; THENCE N00°22'28"E, 5.47 FEET; THENCE N66°21'36"E, 188.31 FEET; THENCE S06°36'01"W, 5.79 FEET; THENCE S66°21'36"W, 187.62 FEET, TO THE POINT OF BEGINNING, THERE TERMINATING. SIDE OF EASEMENT IS PARALLEL TO LOT LINE, AND SHALL LENGTHEN OR SHORTEN TO PROVIDECONTINUITY.ALSO;CENTERLINE OF 20' WIDE EASEMENT IN OUT LOT 2 COMMENCING AT THE SOUTHWEST CORNER OF OUT LOT 2; THENCE S73°58'40"E, 4.82 FEET TO THE CENTERLINE OF THE 20' EASEMENT, THE POINT OF BEGINNING; THENCE N66°18'28"E, ALONG SAID CENTERLINE, 260.48 FEET; THENCE ALONG SAID CENTERLINE, SOUTHEASTERLY 18.66 FEET ALONG THE ARC OF A 20.00 FOOT RADIUSCURVE, CENTER WHICH LIES SOUTHERLY, A CHORD WHICH BEARS S86°57'41"E, A DISTANCE OF 17.99 FEET; THENCE S60°13'50"E, ALONG SAID CENTERLINE, 125.12 FEET; THENCE ALONG SAID CENTERLINE, NORTHEASTERLY 30.75 FEET ALONG THE ARC OF A 20.00 FOOT RADIUSCURVE, CENTER WHICH LIES NORTHERLY, A CHORD WHICH BEARS N75°43'27"E, A DISTANCE OF 27.81 FEET; THENCE N31°40'44"E, ALONG SAID CENTERLINE, 38.28 FEET TO SOUTHERN LINE OF OUT LOT 1, THERETERMINATING. SAID CENTERLINE TERMINUS IS N58°33'30"W, 10.19 FEET FROM THE SOUTHEAST CORNER OFSAID OUT LOT 1. SIDES OF THE EASEMENT ARE PARALLEL TO CENTERLINE, 10 FEET ON EACH SIDE OF CENTERLINE ANDTHEY SHALL LENGTHEN OR SHORTEN TO PROVIDE CONTINUITY.
SURVEYOR'S CERTIFICATEI, AARON PARKS, PROFESSIONAL LAND SURVEYOR S-2861, DO HEREBY CERTIFY THAT UNDER THE DIRECTION OF BILL PRICHARD, I HAVE SURVEYED, DIVIDED, ANDMAPPED REPLAT OF RIVERWOOD WEST SUBDIVISION, AND THAT SUCH PLAT CORRECTLY REPRESENTS ALL EXTERIOR BOUNDARIES AND THE SUBDIVISION OF THELAND SURVEYED, BEING ALL OF RIVERWOOD WEST SUBDIVISION AND THAT PART OF LOT 2 OF CERTIFIED SURVEY MAP #9448-40-78 LOCATED IN GOVERNMENT LOT 4,AND ALL OF OUT LOT 1 OF CERTIFIED SURVEY MAP #8051-31-31 AND THAT PART OF LOT 2 OF CERTIFIED SURVEY MAP #9448-40-78 LOCATED IN THE SOUTHWEST 1/4 OFTHE SOUTHEAST 1/4, ALL IN SECTION 31, T24N, R8E, CITY OF STEVENS POINT, PORTAGE COUNTY, WISCONSIN, DESCRIBED AS FOLLOWS: COMMENCING AT THE SOUTH QUARTER CORNER OF SECTION 31, T24N, R8E; THENCE N89°37'50"E, ALONG THE SOUTH LINE OF THE SOUTHWEST 1/4 OF THE SOUTHEAST 1/4 OF SAID SECTION 31, 1312.58 FEET, TO THE SOUTHEAST CORNERTHEREOF; THENCE N00°22'28"E, ALONG THE EAST LINE OF THE SOUTHWEST 1/4 OF THE SOUTHEAST 1/4, 529.81 FEET, TO THE NORTHEAST CORNER OF LOT 4 OF CERTIFIEDSURVEY MAP #9082-38-12, BEING THE POINT OF BEGINNING; THENCE S66°13'58"W, ALONG THE NORTH LINE OF SAID LOT 4, 102.70 FEET; THENCE N24°09'32"W, 31.28 FEET, TO THE SOUTHEAST CORNER OF OUT LOT 1 OF CERTIFIED SURVEY MAP #8051-31-31; THENCE N87°31'52"W, ALONG THE SOUTH LINE OF SAID OUT LOT 1, 254.50 FEET; THENCE S89°57'05"W, ALONG SAID SOUTH LINE, 175.09 FEET, TO THE EXISTING EAST RIGHT OF WAY LINE OF WEST ZINDA DRIVE ALSO THE SOUTHWEST CORNER OFSAID OUT LOT 1; THENCE N00°02'30"W, ALONG THE SAID EXISTING EAST RIGHT OF WAY LINE, 60.00 FEET TO THE NORTHWEST CORNER OF SAID OUT LOT 1; THENCE N89°57'05"E, ALONG THE NORTH LINE OF SAID OUT LOT 1, 176.40 FEET; THENCE S87°31'52"E, ALONG THE NORTH LINE OF SAID OUT LOT 1, 122.00 FEET TO THE SOUTHWEST CORNER OF LOT 2 OF CERTIFIED SURVEY MAP #9448-40-78; THENCE N00°10'01"W, ALONG THE WEST LINE OF SAID LOT 2, 736.11 FEET TO THE NORTHWEST CORNER OF SAID LOT 2; THENCE N89°32'11"E, ALONG THE NORTH LINE OF SAID LOT 2, 245.22 FEET TO THE NORTHEAST CORNER OF SAID LOT 2, ALSO THE NORTHWEST CORNER OFGOVERNMENT LOT 4; THENCE N89°55'51"E, ALONG THE NORTH LINE OF SAID LOT 2 AND THE NORTH LINE OF RIVERWOOD WEST SUBDIVISION, 616.95 FEET TO THE EXISTING SOUTHERNRIGHT OF WAY OF THE CANADIAN NATIONAL RAILROAD; THENCE ALONG SAID EXISTING SOUTHERN RIGHT OF WAY, SOUTHEASTERLY 498.77 FEET ALONG THE ARC OF A 2879.93 FOOT RADIUS CURVE, CENTER WHICH LIESNORTHEASTERLY, A CHORD WHICH BEARS S67°18'05"E, A DISTANCE OF 498.15 FEET TO THE EXISTING WEST RIGHT OF WAY LINE OF WEST RIVER DRIVE, ALSO THENORTHEAST CORNER OF SAID SUBDIVISION; THENCE S15°57'56"W, ALONG THE SAID EXISTING WEST RIGHT OF WAY LINE, 325.06 FEET TO THE SOUTHEAST CORNER OF SAID SUBDIVISION; THENCE N73°59'32"W, ALONG THE SOUTH LINE OF SAID SUBDIVISION, 150.25 FEET; THENCE S15°52'37"W, ALONG THE EAST LINE OF SAID SUBDIVISION AND THE EAST LINE OF LOT 2 OF CERTIFIED SURVEY MAP #9448-40-78, 408.37 FEET, TO THE NORTHLINE OF LOT 1 OF CERTIFIED SURVEY MAP #3226-11-184; THENCE N73°58'35"W, ALONG THE SAID NORTH LINE, 586.91 FEET; THENCE S66°21'36"W, 187.62 FEET TO THE WEST LINE OF GOVERNMENT LOT 4; THENCE S00°22'28"W, ALONG SAID WEST LINE OF GOVERNMENT LOT 4, 22.37 FEET TO THE POINT OF BEGINNING, THERE TERMINATING. SAID PARCEL CONTAINS 20.664 ACRES, MORE OR LESS.THAT SUCH PLAT IS A CORRECT REPRESENTATION OF ALL OF THE EXTERIOR BOUNDARIES OF THE LAND SURVEYED AND THE SUBDIVISION THEREOF MADE.THAT I HAVE FULLY COMPLIED WITH THE PROVISIONS OF CHAPTER 236 OF THE WISCONSIN STATUTES AND THE PROVISIONS OF THE SUBDIVISION ORDINANCEOF THE CITY OF STEVENS POINT, WISCONSIN, IN SURVEYING, DIVIDING AND MAPPING THE SAME.DATED THIS 23RD DAY OF JULY, 2026.
___________________________________AARON PARKSPROFESSIONAL LAND SURVEYOR S-2861
PREPARED BY:AARON PARKS, PLS #2861GREMMER & ASSOCIATES, INC.120 WILSHIRE BLVD. NORTHSTEVENS POINT, WI 54481PHONE (715)341-4363
FORWARD
There are no objections to this plat with respect to Secs. 236.15, 236.16, 236.20 and 236.21(1) and (2),Wis. Stats. as provided by s. 236.12, Wis. Stats.Certified __________________, 20_____Department of Administration
SHEET 2 OF 2 SHEETS
DEVELOPER/OWNER:THE ELIZABETH REVOCABLE TRUSTco: BILL PRICHARD3364 COTTAGE HILL DRIVEGREEN BAY, WI 54311
REPLAT OF RIVERWOOD WEST SUBDIVISIONA SUBDIVISION PLAT OF REPLAT OF RIVERWOOD WEST SUBDIVISION, BEING ALL OF RIVERWOOD WEST SUBDIVISION AND THAT PART OF LOT 2 OF CSM #9448-40-78 LOCATED IN GOVERNMENT LOT 4, AND ALL OFOUT LOT 1 OF CSM #8051-31-31 AND THAT PART OF LOT 2 OF CERTIFIED SURVEY MAP #9448-40-78 LOCATED IN THE SOUTHWEST 1/4 OF THE SOUTHEAST 1/4, ALL IN SECTION 31, TOWNSHIP 24 NORTH, RANGE 8 EAST,CITY OF STEVENS POINT, PORTAGE COUNTY, WISCONSIN.
Page 36 of 116
PLAN OF PROPOSED IMPROVEMENT
1
ORDER OF SHEETS
LAYOUT
SCALE 0
TOTAL NET LENGTH OF CENTERLINE =
2
3
4 - 10
13 - 14
15 - 16
17 - 18
COUNTY:
PLOT NAME :P:\PROJECTS_CURRENT\PORTAGE\PRITCHARD\WEST ZINDA-RIVER SUBDIVISION - 2025\ACAD\PRICHARD_TYPICAL.DWGFILE NAME : 5/4/2026 4:48 PMPLOT DATE : PLOT BY : DEXTER KAETTERHENRY
TOTAL SHEETS = 23
PAGE NO:
PAGE NO:
PAGE NO:
PAGE NO:
PAGE NO:
PAGE NO:
PAGE NO:
PAGE NO:
PORTAGE
SCALE
1,201 LF
HORIZONTAL POSITIONS SHOWN ON THIS PLAN ARE WISCONSIN
COORDINATE REFERENCE SYSTEM (WISCRS),
NAD83 ( ), IN U.S. SURVEY FEET. POSITIONS SHOWN ARE GRID
COORDINATES, GRID BEARINGS, AND GRID DISTANCES. GRID DISTANCES
ARE THE SAME AS GROUND DISTANCES.
ELEVATIONS ARE REFERENCED TO NAVD 88 ( ). GPS DERIVED
ELEVATIONS ARE BASED ON GEOID
2011
PORTAGE COUNTY
2012
12A
RIVER WOOD WEST SUBDIVISION
PROJECT LOCATION
RIVER WOOD WEST SUBDIVISION
TITLE
PROJECT OVERVIEW
TYPICAL SECTIONS / GENERAL NOTES
CONSTRUCTION DETAILS
EROSION CONTROL PLAN
UTILITY PLANS
GRADING PLANS
PLAN AND PROFILE
CROSS SECTIONS
19 - 23PAGE NO:
DEXTER D. KAETTERHENRY, PEDATE
6/24/2026
11 - 12
Page 37 of 116
MH
MH
MH
GUYGUY
GUY POLE
GUY POLE
GUYGUY
GUYGUYMH
GUY
GUYGUY
SAN
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
97
98 99 100 101 102
103
104
104
199
200
201
202
203
204
205
205
WISDOT/CADDS SHEET 42
E
P:\PROJECTS_CURRENT\PORTAGE\PRITCHARD\WEST ZINDA-RIVER SUBDIVISION - 2025\ACAD\PRICHARD_PROJECTOVERVIEW.DWGFILE NAME : 6/23/2026 1:27 PMPLOT DATE : PLOT BY : DEXTER KAETTERHENRY
2
PROJECT:
PLOT NAME :
2
SHEET
PLOT SCALE : ######
RIVER WOOD WEST SUBDIVISION PROJECT OVERVIEW:
LAYOUT NAME - PO
WEST RIVER DRIVE
WEST ZINDA DRIVE
GREEN CIRCLE TRAIL
SLOPE INTERCEPT
SLOPE INTERCEPT
GREEN CIRCLE TRAIL
RESURFACE
EXISTING ROAD
TEST PIT #1
TEST PIT #2
REALIGNTRAIL
2
Page 38 of 116
WISDOT/CADDS SHEET 42
E
P:\PROJECTS_CURRENT\PORTAGE\PRITCHARD\WEST ZINDA-RIVER SUBDIVISION - 2025\ACAD\PRICHARD_TYPICAL.DWGFILE NAME : 6/22/2026 2:40 PMPLOT DATE : PLOT BY : DEXTER KAETTERHENRY
2
PROJECT NO:
PLOT NAME :
2
SHEET
PLOT SCALE : 1 IN:10 FT
RIVER WOOD WEST SUBDIVISION GENERAL NOTES / TYPICAL SECTIONS
LAYOUT NAME - 01-10ft
11' 2'11'2' 5.62' 0'-3'5.62'0'-3'
33' 33'R/LR/W R/W
4" HMA PAVEMENT
UPPER: 1.75" 4MT 58-34S
LOWER: 2.25" 3MT 58-28S
12" BASE AGGREGATE DENSE 1 1/4-INCH
4" BASE AGGREGATE DENSE 3/4-INCH 4" BASE AGGREGATE DENSE 3/4-INCH
FINISHED TYPICAL SECTION
STA 100+00 - 104+66 (WEST ZINDA DRIVE ENTRANCE)
STA 199+75 - 204+80 (WEST RIVER DRIVE ENTRANCE)
GENERAL NOTES:
UTILITY FACILITIES SHOWN WITHIN THE PLANS ARE
APPROXIMATE AND THERE MAY BE OTHER FACILITIES NOT
SHOWN. PRIVATE UTILITIES AND OTHER UTILITIES NOT
LOCATED BY A DIGGERS HOTLINE LOCATE ARE NOT SHOWN.
FIELD VERIFY AND LOCATE ALL UTILITIES FOR ACTUAL
LOCATIONS, OTHER FACULTIES, SIZES, TYPES, MATERIAL,
AND DEPTHS.
ANY ROADWAY OR DRIVEWAY WORK OVER EXISTING
UNDERGROUND PIPING LOCATED WITHIN AN ESTABLISHED
EASEMENT SHALL BE FULLY ENCASED IN CONCRETE.
COORDINATE WITH AHLSTROM TO ENSURE PERSONNEL ARE
PRESENT ON-SITE FOR INSPECTION.
CONTRACTOR MUST AHDERE TO ALL OVERHEAD POWER
LINE CLEARANCES.
ALL FINAL MANHOLES NEED TO BE ADJUSTED UTILIZING THE
CORE AND POUR METHOD.
CONTACTS:
OWNER
THE ELIZABETH TRUST
ATTN: WILLIAM PRITCHARD
3364 COTTAGE HILL DRIVE
GREEN BAY, WI 54311
PHONE: 715.570.7211
ENGINEER
GREMMER & ASSOCIATES
ATTN: DEXTER KAETTERHENRY
120 WILSHIRE BOULEVARD NORTH
STEVENS POINT, WI 54481
PHONE: 715.341.4363
EMAIL: D.KAETTERHENRY@GREMMERASSOCIATES.COM
UTILITY EASEMENT
AHLSTROM
ATTN: NICHOLAS PROULX
707 ARLINGTON PLACE
STEVENS POINT, WI 54481
EMAIL: NICK.PROULX@AHLSTROM.COM
UTILITY EASEMENT
BILLERUD
ATTN: MARK ANDERSON
610 HIGH STREET
WISCONSIN RAPIDS, WI 54495
PHONE: 715.422.3927
EMAIL: MARK.ANDERSON2@BILLERUD.COM
GEOGRID
11' 2'11'2'
33' 33'R/LR/W R/W
FINISHED TYPICAL SECTION
STA 97+70 - 100+00 (WEST ZINDA DRIVE ENTRANCE)
4" HMA PAVEMENT
UPPER: 1.75" 4MT 58-34S
LOWER: 2.25" 3MT 58-28S
4" BASE AGGREGATE DENSE 3/4-INCH4" BASE AGGREGATE DENSE 3/4-INCH
REMOVE EXISTING ASPHALTIC MATERIAL
3
Page 39 of 116
OH
OH
WISDOT/CADDS SHEET 44
E
P:\PROJECTS_CURRENT\PORTAGE\PRITCHARD\WEST ZINDA-RIVER SUBDIVISION - 2025\ACAD\PRICHARD_PLANPROFILE.DWGFILE NAME : 5/26/2026 2:18 PMPLOT DATE : PLOT BY : DEXTER KAETTERHENRY
PROJECT:
PLOT NAME :
CONSTRUCTION DETAILS SHEET
PLOT SCALE : ##########
RIVER WOOD WEST SUBDIVISION
LAYOUT NAME - 02 (3)
1085
1086
1087
1088
1088
1089
1089
1090
1090
1088
1087
1089
1090
EMERGENCY RIPRAP OVERFLOW
4' 4' 10' 4'4'
TOP OF BERM
· WEST ZINDA DRIVE = 1093.25
· WEST RIVER DRIVE = 1086.25
OVERFLOW
· WEST ZINDA DRIVE = 1092.75
· WEST RIVER DRIVE = 1085.75
GEOTEXTILE FABRIC, TYPE HR
RIPRAP MEDIUM
12" MIN
STORMWATER POND NOTES
DRAINAGE SWALE CONSTRUCTION WITHIN POND LIMITS IS INCIDENTAL TO POND GRADING. STORMWATER BASIN SHALL BE CONSTRUCTED PRIOR TO MASS
GRADING AND DISTURBING ACTIVITIES.
WET BASIN SHALL HAVE A MINIMUM 2-FOOT THICK TYPE 'A' CLAY LINER. CLAY LINER SHALL BE CONSTRUCTED IN ACCORDANCE WITH WDNR TECHNICAL
STANDARD 1001. COMPACT CLAY AND DOCUMENT AS SPECIFIED IN NRCS WISCONSIN CONSTRUCTION SPECIFICATION 300, CLAY LINERS. A QUALIFIED
GEOTECHNICAL ENGINEER OR SOIL SCIENTIST SHALL CERTIFY IN WRITING CONSTRUCTION OF THE WET DETENTION BASIN.
TREAT PORTION OF SAFETY SHELF IN FRONT OF POND OUTLET WITH GEOTEXTILE FABRIC AND LIGHT RIPRAP TO DETER PLANT GROWTH IN FRONT OF OUTLET
STRUCTURE. KEY RIPRAP 6" - 12" THICK INTO SAFETY SHELF TO MATCH FINISH GRADING ELEVATIONS.
ALL DISTURBED AREAS OF THE POND ABOVE THE SAFETY SHELF SHALL BE RESTORED WITH TOPSOIL, SEED MIXTURE (WISDOT MIXTURE #70 OR EQUIVALENT),
FERTILIZER, AND EROSION MAT URBAN CLASS I TYPE B.
POND AS-BUILT SURVEY REQUIRED UPON COMPLETION OF CONSTRUCTION ACTIVITIES.
1091
1091
1092
EXISTING WETLAND
BOUNDARY
SLOPE INTERCEPT
BERM
1093.25
BERM
1093.25
A A
SECTION A-A
SECTION B-B
8'
SAFETY SHELF
2:1
3:1
2'
NOTE: DRAWING NO TO SCALE
AND SHALL BE USED FOR
SCHEMATIC PURPOSES ONLY
EMERGENCY OVERFLOW
1092.75
BERM
1093.25
WDNR TYPE "A" LINER
2' MIN IF CLAY
(SEE NOTES)
SALVAGED TOPSOIL, WISDOT MIXTURE #70
AND NURSE CROP, FERTILIZER, AND EROSION
MAT URBAN CLASS I TYPE B
BOTTOM OF POND
1086
B
B
2'
10'
SAFETY SHELF
BOTTOM OF POND
1079
2:1
3:1
4:1
4:1
EMERGENCY OVERFLOW
1085.75
BERM
1086.25
BOTTOM OF SAFETY SHELF
1090
BOTTOM OF SAFETY SHELF
1083
WDNR TYPE "A" LINER
2' MIN IF CLAY
(SEE NOTES)
SALVAGED TOPSOIL, WISDOT MIXTURE #70
AND NURSE CROP, FERTILIZER, AND EROSION
MAT URBAN CLASS I TYPE B
RIPRAP LIGHT AND
GEOTEXTILE FABRIC TYPE R
RIPRAP LIGHT AND
GEOTEXTILE FABRIC TYPE R
PERMANENT POOL = 1084.00
HW2 = 1084.86
HW10 = 1085.76
HW100 = 1086.13
PERMANENT POOL = 1091.00
HW2 = 1092.24
HW10 = 1092.85
HW100 = 1093.03
BERM
1086.25
EXISTING WETLAND
BOUNDARY
SLOPE INTERCEPT
1086
1085
1085
1084
1084
1084
1087
1086
1085
1084
1088
1082
1083
1082
1081
1083
1080
1081
1079
1083
1085
1089
1090
1079
1080
1086
1086
1093
1091
1090
1093
1092
1093
1093
1092
1091
12" PIPE WITH 4" ORIFICE @ 0.1%
12" PIPE WITH 4" ORIFICE @ 0.1%
4
Page 40 of 116
4' MAX DEPTH OF
TOP OF RISER AT
LOT LINE BELOW
EXISTING GRADE
8' SANITARY SEWER MAIN
1.05% MIN
6" SANITARY SEWER LATERAL
8x8x6 WYE
8" SANITARY SEWER MAIN
6" SANITARY SEWER LATERAL
8" SANITARY SEWER MAIN
EXISTING HOME
EXISTING SANITARY SEWER LATERAL
R/W
SANITARY SEWER LATERAL CONNECTION
(INCIDENTAL TO SANITARY LATERAL BID ITEM)
PLAN VIEW
CROSS SECTION VIEW
45 DEGREE BEND
R/W
45 DEGREE BEND
CONNECT TO EXISTING PIPE
WISDOT/CADDS SHEET 42
E
P:\PROJECTS_CURRENT\PORTAGE\STEVENS POINT, CITY OF\BUS 51\ACAD\SHEETSPLAN\021001_CD\021002_CD.DWGFILE NAME : 5/8/2026 10:30 AMPLOT DATE : PLOT BY : DEXTER KAETTERHENRY
2
PROJECT:
PLOT NAME :
2
SHEET
PLOT SCALE : 1 IN:5 FT
LAYOUT NAME - 01 (5)
CONSTRUCTION DETAILS:Z/sZtKKt^d^h/s/^/KE
E
SHEET
CONSTRUCTION DETAILS:
2
5
Page 41 of 116
WISDOT/CADDS SHEET 42
E
P:\PROJECTS_CURRENT\PORTAGE\STEVENS POINT, CITY OF\BUS 51\ACAD\SHEETSPLAN\021001_CD\021002_CD.DWGFILE NAME : 5/8/2026 10:29 AMPLOT DATE : PLOT BY : DEXTER KAETTERHENRY
2
PROJECT:
PLOT NAME :
2
SHEET
PLOT SCALE : 1 IN:10 FT
LAYOUT NAME - 02
CONSTRUCTION DETAILS:RIVER WOOD WEST SUBDIVISION
6
Page 42 of 116
WISDOT/CADDS SHEET 42
EHWY: COUNTY:
P:\PROJECTS_CURRENT\PORTAGE\STEVENS POINT, CITY OF\BUS 51\ACAD\SHEETSPLAN\021001_CD\021002_CD.DWGFILE NAME : 5/8/2026 10:30 AMPLOT DATE : PLOT BY : DEXTER KAETTERHENRY
2
PROJECT NO:
PLOT NAME :
2
SHEET
PLOT SCALE : 1 IN:10 FT
LAYOUT NAME - 06
BUSINESS 51 PORTAGE CONSTRUCTION DETAILS:26-105
GEOTEXTILE
HYDRANT & GATE VALVE INSTALLATION
CRUSHED ROCK
WATER SERVICE CONNECTION
WATER VALVE BOX BEDDING WATER MAIN PIPE INSULATION
BURY DEPTH
7
Page 43 of 116
WISDOT/CADDS SHEET 42
E
P:\PROJECTS_CURRENT\PORTAGE\STEVENS POINT, CITY OF\BUS 51\ACAD\SHEETSPLAN\021001_CD\021002_CD.DWGFILE NAME : 5/8/2026 10:30 AMPLOT DATE : PLOT BY : DEXTER KAETTERHENRY
2
PROJECT:
PLOT NAME :
2
SHEET
PLOT SCALE : 1 IN:5 FT
LAYOUT NAME - 08
CONSTRUCTION DETAILS:RIVER WOOD WEST SUBDIVISION
8
Page 44 of 116
WISDOT/CADDS SHEET 42
E
P:\PROJECTS_CURRENT\PORTAGE\STEVENS POINT, CITY OF\BUS 51\ACAD\SHEETSPLAN\021001_CD\021002_CD.DWGFILE NAME : 5/8/2026 10:30 AMPLOT DATE : PLOT BY : DEXTER KAETTERHENRY
2
PROJECT:
PLOT NAME :
2
SHEET
PLOT SCALE : 1 IN:5 FT
LAYOUT NAME - 09
RIVER WOOD WEST SUBDIVISION CONSTRUCTION DETAILS:
9
Page 45 of 116
WISDOT/CADDS SHEET 42
E
P:\PROJECTS_CURRENT\PORTAGE\PRITCHARD\WEST ZINDA-RIVER SUBDIVISION - 2025\ACAD\PRICHARD_TYPICAL.DWGFILE NAME : 6/22/2026 2:46 PMPLOT DATE : PLOT BY : DEXTER KAETTERHENRY
2
PROJECT NO:
PLOT NAME :
2
SHEET
PLOT SCALE : 1 IN:10 FT
RIVER WOOD WEST SUBDIVISION
LAYOUT NAME - 02-10ft
CONSTRUCTION DETAIL
CORE-AND-POUR METHOD
NOTES:
A CIRCULAR-SHAPED CONCRETE COLLAR IS REQUIRED ON BITUMONOUS PAVED ROADWAY.
INSTALL A 9" (TYP.) THICK CONCRETE COLLAR THAT SHALL BE FLUSH WITH THE ASPHALT
SURFACE WITH A SURFACE TOLERANCE OF +0" TO -1/4".
CONCRETE SHALL BE 3,000 PSI MINIMUM AT 28 DAYS, WATER-TO-CEMENT RATIO
SHALL BE 0.5, 3" MAXIMUM SLUMP, AND 3%-6% ENTRAINED AIR WITH ONE #4
REBAR HOOP. FIBER-REINFORCED CONCRETE (ADDED PER MANUFACTURER'S
RECOMMENDATIONS) MAY BE USED IN LIEU OF #4 REBAR.
CONCRETE COLLAR TO MATCH
CASTING HEIGHT (9" TYPICAL)
10
Page 46 of 116
SAN
OH
OH
OH
OH
OH
OH
OH
OH
EP: 104+79.58
PC: 101+64.28
PC: 100+03.38
PT: 104+12.37
PT: 100+41.25
100
101
102
103
104
WISDOT/CADDS SHEET 44
E
P:\PROJECTS_CURRENT\PORTAGE\PRITCHARD\WEST ZINDA-RIVER SUBDIVISION - 2025\ACAD\PRICHARD_PLANPROFILE.DWGFILE NAME : 6/23/2026 8:49 AMPLOT DATE : PLOT BY : DEXTER KAETTERHENRY
PROJECT:
PLOT NAME :
EROSION CONTROL: SHEET
PLOT SCALE : ##########
RIVER WOOD WEST SUBDIVISION WEST ZINDA DRIVE ENTRANCE
LAYOUT NAME - 01 (2)
1096
1095
1094
1094
1095
1094
1095
1096
1097
1098
1095
1094
1093
1092
1093
1092 1091
1090 1089
1095
1091
1091
1092
EXISTING WETLAND
BOUNDARY
STORMWATER DETAIL
SEE DETAIL
PROPERTY LINE
PROPERTY LINE
1096
SLOPE INTERCEPT
BERM
BERM
1" = 60 FT
0 60 120
TEMPORARY DITCH CHECK
INSTALL AND MAINTAIN TRACKING PAD
SILT FENCE
CULVERT PIPE CHECK
1
2
EROSION CONTROL KEYNOTES
3
EROSION CONTROL PLAN
EROSION CONTROL MEASURES SHALL BE IN ACCORDANCE
WITH LOCAL ORDINANCES, AND IMPLEMENTED AND
CONSTRUCTED IN ACCORDANCE WITH WDNR
CONSERVATION PRACTICE TECHNICAL STANDARDS. EROSION
CONTROL ITEMS SHALL BE FIELD LOCATED AS NEEDED.
TRACKING PAD SHALL BE INSTALLED FOR ANY EQUIPMENT
OPERATING ON SOIL BEFORE LEAVING THE SITE. TRACKING
PAD SHALL FOLLOW WDNR TECHNICAL STANDARD 1057.
ALL AREAS DISTURBED BY CONSTRUCTION SHALL RECEIVE 4"
(MIN.) TOPSOIL, SEED, FERTILIZER, AND MULCH. SEEDING
SHALL BE PERFORMED IN ACCORDANCE WITH WDNR
SEEDING TECHNICAL STANDARDS 1059.
ALL OFF-SITE SEDIMENT DEPOSITS OCCURRING AS A RESULT
OF CONSTRUCTION WORK OR A STORM EVENT SHALL BE
CLEANED UP BY THE END OF EACH DAY. FLUSHING SHALL
NOT BE ALLOWED.
ALL SWALE LOCATIONS SHALL HAVE EROSION MAT CLASS II
TYPE A DOWN FLOWLINE.
FOR ANY DISTURBED AREA THAT REMAINS INACTIVE FOR
MORE THAN 7 WORKING DAYS, OR WHERE GRADING
EXTENDS BEYOND THE PERMANENT SEEDING DEADLINES,
THE SITE MUST BE TREATED WITH TEMPORARY
STABILIZATION MEASURES SUCH AS SOIL TREATMENT,
TEMPORARY SEEDING AND/OR MULCHING, EMAT, OR
ANIONIC POLYACRYLAMIDE (PAM) AS A TEMPORARY SOIL
BINDING AGENT.
ALL TEMPORARY BEST MANAGEMENT PRACTICES SHALL BE
MAINTAINED UNTIL THE SITE IS STABILIZED.
CONCRETE WASHOUT AREA TO BE LINED SO THAT ALL
WASHOUT WATER IS CONTAINED WITHIN THE WASHOUT
AREA. REFER TO EPA CONCRETE WASHOUT GUIDANCE FOR
MORE INFORMATION.
ANY SOIL EROSION THAT OCCURS AFTER FINAL GRADING
AND/OR THE APPLICATION OF THE STABILIZATION MEASURE
MUST BE REPAIRED AND THE STABILIZATION WORK REDONE.
THE SITE WORK MUST DEMONSTRATE LONG-TERM EROSION
STABILIZATION FROM VARIATIONS OF SEASONAL
RAINFALL/RUNOFF CONDITIONS.
INSTALL SILT FENCE IN AREAS WHERE ON-SITE SOILS AND
STORMWATER MAY EXIT THE CONSTRUCTION SITE.
ALL DISTURBED AREAS SHALL BE TREATED WITH
STABILIZATION MEASURES AS SPECIFIED WITHIN 3 WORKING
DAYS OF FINAL GRADING.
CONSTRUCTION TRAFFIC SHOULD AVOID ALL PROPOSED
RETENTION/INFILTRATION AREAS TO LIMIT COMPACTION
DURING CONSTRUCTION.
REMOVE ANY ACCUMULATED SEDIMENT FROM RETENTION/
INFILTRATION AREAS AND SWALES WHEN CONSTRUCTION IS
FINISHED.
TEMPORARY SPOIL PILE IF REQUIRED MUST BE LOCATED
WITHIN THE SITE AND INCLUDE PERIMETER SEDIMENT
CONTROL. SILT FENCE AROUND PERIMETER OF PILE IS
REQUIRED TO PREVENT ANY EROSION OR SEDIMENTS
LEAVING THE PROPERTY. PLANS SHOW AN APPROXIMATE
AREA. CONTRACTOR TO PROVIDE ADDITIONAL AREA IF
NECESSARY.
ALL RETENTION/INFILTRATION AREA BOTTOMS SHALL HAVE
2" OF COMPOST SCARIFIED TO A DEPTH OF 6".
ALL EROSION CONTROL ITEMS SHOULD BE PLACED BEFORE
GROUND DISTURBING ACTIVITIES BEGIN.
INSTALL INLET PROTECTION AT EACH INLET ADJACENT TO
THE PROJECT LIMITS ON POST ROAD.
4
4
4 4
4
4
2
1
1
1
1
1 1
3
3
3
1
1086
1093
1091
1090
1093
1092
1093
1093
1092
1091
3
3
EXTEND TO END OF
GRADING LIMITS ON
GRADING PLAN
11
Page 47 of 116
GUY POLE
GUY POLE
GUYGUY
GUYGUYMH
GUY
GUYGUY
OH
OH
OH
OH
OH
OH
199
200
201
202
203
204
PC: 202+53.46
PC: 203+78.03
PT: 203+30.53
PT: 204+48.24
OH
OH
WISDOT/CADDS SHEET 44
E
P:\PROJECTS_CURRENT\PORTAGE\PRITCHARD\WEST ZINDA-RIVER SUBDIVISION - 2025\ACAD\PRICHARD_PLANPROFILE.DWGFILE NAME : 6/23/2026 8:53 AMPLOT DATE : PLOT BY : DEXTER KAETTERHENRY
PROJECT:
PLOT NAME :
EROSION CONTROL: SHEET
PLOT SCALE : ##########
RIVER WOOD WEST SUBDIVISION WEST RIVER DRIVE ENTRANCE
LAYOUT NAME - 02 (2)
1085
1086
1087
1088
1088
1089
1089
1090
1090
1088
1087
1089
1090
1090
1089
1091
1092
1093
1104
1105
1103
1102
1101 1101 11001099
1098
1097
1096
1095
1094
1093
1092
110211011100109910981097
10961095
STORMWATER DETAIL
1" = 60 FT
0 60 120
TEMPORARY DITCH CHECK
INSTALL AND MAINTAIN TRACKING PAD
SILT FENCE
CULVERT PIPE CHECK
1
2
EROSION CONTROL KEYNOTES
3
EROSION CONTROL PLAN
EROSION CONTROL MEASURES SHALL BE IN ACCORDANCE
WITH LOCAL ORDINANCES, AND IMPLEMENTED AND
CONSTRUCTED IN ACCORDANCE WITH WDNR
CONSERVATION PRACTICE TECHNICAL STANDARDS. EROSION
CONTROL ITEMS SHALL BE FIELD LOCATED AS NEEDED.
TRACKING PAD SHALL BE INSTALLED FOR ANY EQUIPMENT
OPERATING ON SOIL BEFORE LEAVING THE SITE. TRACKING
PAD SHALL FOLLOW WDNR TECHNICAL STANDARD 1057.
ALL AREAS DISTURBED BY CONSTRUCTION SHALL RECEIVE 4"
(MIN.) TOPSOIL, SEED, FERTILIZER, AND MULCH. SEEDING
SHALL BE PERFORMED IN ACCORDANCE WITH WDNR
SEEDING TECHNICAL STANDARDS 1059.
ALL OFF-SITE SEDIMENT DEPOSITS OCCURRING AS A RESULT
OF CONSTRUCTION WORK OR A STORM EVENT SHALL BE
CLEANED UP BY THE END OF EACH DAY. FLUSHING SHALL
NOT BE ALLOWED.
ALL SWALE LOCATIONS SHALL HAVE EROSION MAT CLASS II
TYPE A DOWN FLOWLINE.
FOR ANY DISTURBED AREA THAT REMAINS INACTIVE FOR
MORE THAN 7 WORKING DAYS, OR WHERE GRADING
EXTENDS BEYOND THE PERMANENT SEEDING DEADLINES,
THE SITE MUST BE TREATED WITH TEMPORARY
STABILIZATION MEASURES SUCH AS SOIL TREATMENT,
TEMPORARY SEEDING AND/OR MULCHING, EMAT, OR
ANIONIC POLYACRYLAMIDE (PAM) AS A TEMPORARY SOIL
BINDING AGENT.
ALL TEMPORARY BEST MANAGEMENT PRACTICES SHALL BE
MAINTAINED UNTIL THE SITE IS STABILIZED.
CONCRETE WASHOUT AREA TO BE LINED SO THAT ALL
WASHOUT WATER IS CONTAINED WITHIN THE WASHOUT
AREA. REFER TO EPA CONCRETE WASHOUT GUIDANCE FOR
MORE INFORMATION.
ANY SOIL EROSION THAT OCCURS AFTER FINAL GRADING
AND/OR THE APPLICATION OF THE STABILIZATION MEASURE
MUST BE REPAIRED AND THE STABILIZATION WORK REDONE.
THE SITE WORK MUST DEMONSTRATE LONG-TERM EROSION
STABILIZATION FROM VARIATIONS OF SEASONAL
RAINFALL/RUNOFF CONDITIONS.
INSTALL SILT FENCE IN AREAS WHERE ON-SITE SOILS AND
STORMWATER MAY EXIT THE CONSTRUCTION SITE.
ALL DISTURBED AREAS SHALL BE TREATED WITH
STABILIZATION MEASURES AS SPECIFIED WITHIN 3 WORKING
DAYS OF FINAL GRADING.
CONSTRUCTION TRAFFIC SHOULD AVOID ALL PROPOSED
RETENTION/INFILTRATION AREAS TO LIMIT COMPACTION
DURING CONSTRUCTION.
REMOVE ANY ACCUMULATED SEDIMENT FROM RETENTION/
INFILTRATION AREAS AND SWALES WHEN CONSTRUCTION IS
FINISHED.
TEMPORARY SPOIL PILE IF REQUIRED MUST BE LOCATED
WITHIN THE SITE AND INCLUDE PERIMETER SEDIMENT
CONTROL. SILT FENCE AROUND PERIMETER OF PILE IS
REQUIRED TO PREVENT ANY EROSION OR SEDIMENTS
LEAVING THE PROPERTY. PLANS SHOW AN APPROXIMATE
AREA. CONTRACTOR TO PROVIDE ADDITIONAL AREA IF
NECESSARY.
ALL RETENTION/INFILTRATION AREA BOTTOMS SHALL HAVE
2" OF COMPOST SCARIFIED TO A DEPTH OF 6".
ALL EROSION CONTROL ITEMS SHOULD BE PLACED BEFORE
GROUND DISTURBING ACTIVITIES BEGIN.
INSTALL INLET PROTECTION AT EACH INLET ADJACENT TO
THE PROJECT LIMITS ON POST ROAD.
4
4
4 4
4
4
4
4
4
4
4
4
44
4
21
1
1
1
1
1
1
1
3
3
3
3
3
1086
1085
1086
1085
1084
1084
1084
1087
1086
1085
1084
1088
1082
1083
1082
1081
1083
1080
1081
1079
1083
1085
1089
1090
1079
1080
3
EXTEND TO END OF
GRADING LIMITS ON
GRADING PLAN
12
Page 48 of 116
1080
1085
1090
1095
1100
1105
1080
1085
1090
1095
1100
1105
99 100 101 102 103 104 105
3104+52.60
OFF 17.39
3
RIM: 1095.30
SUMP: 1084.28
DEPTH: 11.02
S INV OUT: 1086.34
153.6' of SANITARY
SEWER PVC 8 INCH @
0.40%112.4' of SANITARY
SEWER PVC 8 INCH @
0.40%
2103+00.00
OFF 0.00
2
RIM: 1095.60
SUMP: 1085.62
DEPTH: 9.98
N INV IN: 1085.72
SW INV OUT: 1085.62
1101+85.68
OFF 2.18
1
RIM: 1095.59
SUMP: 1085.07
DEPTH: 10.52
NE INV IN: 1085.17
S INV OUT: 1085.07
SAN
OH
OH
OH
OH
OH
99 100
101
102
103
104
SAN
SAN
SAN
SAN
SAN
SAN
SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
WWWWWWWW
W
6"WM
W
8"WM
8"WM
8"WM
W
W
W
W
CONNECT TO EXISTING
8 X 8-INCH TEE
STA 101+91.95
8-INCH 22.5° BEND
STA 101+96.79
8-INCH GATE VALVE
STA 102+00.44
8-INCH 22.5° BEND
STA 104+09.33
8 X 6-INCH REDUCER
STA 104+43.75
6-INCH GATE VALVE
STA 104+47.16
HYDRANT 6.0' BURY DEPTH
STA 104+50.56
W
W 8"WM
W
W
W
8"WM
WISDOT/CADDS SHEET 44
E
P:\PROJECTS_CURRENT\PORTAGE\PRITCHARD\WEST ZINDA-RIVER SUBDIVISION - 2025\ACAD\PRICHARD_UTILITYPLANPROFILE.DWGFILE NAME : 6/22/2026 1:39 PMPLOT DATE : PLOT BY : DEXTER KAETTERHENRY
PROJECT:
PLOT NAME :
UTILITY PLAN: SHEET
PLOT SCALE : 1 IN:40 FT
RIVER WOOD WEST SUBDIVISION WEST ZINDA DRIVE ENTRANCE
LAYOUT NAME - 03
SAN MH 2
STA 103+00
OFFSET = 0' RT
RIM = 1095.60
INV IN = 1085.72
INV OUT = 1085.62
SAN MH 3
STA 104+52.6
OFFSET = 17.4' RT
RIM = 1094.61
INV OUT = 1086.34
EX SAN MH 1
STA 101+85.7
OFFSET = 2.2' RT
RIM = 1095.67
INV IN = 1085.17
INV OUT = 1085.07
(RECONSTRUCTING
MANHOLE REQUIRED)
A
B C
D
E
SANITARY LATERALS
LATERAL KEYNOTE CONNECTION TO MAIN
STATION
CONNECTION TO MAIN
OFFSET
A 103+97 3.0' LT
B 104+31 7.0' RT
C 104+40 12.2' RT
D 104+44 15.4' RT
E 104+16 2.7' RT
POTENTIAL DRIVEWAY
LOCATION, TYP
UTILITY NOTES:
CONTRACTOR SHALL VERIFY DEPTHS OF EXISTING SANITARY SEWER AND WATERMAIN PRIOR TO INSTALLATION.
SANITARY AND WATER LATERAL LOCATIONS CAN BE REVISED BY ENGINEER TO FIT FIELD CONDITIONS.
ALL WATER LATERALS SHALL BE 1" POLYETHYLENE.
ALL SANITARY LATERALS SHALL BE 6" PVC.
CONNECTION TO EXISTING MANHOLE WILL REQUIRE RECONSTRUCTING OF MANHOLE. EXISTING RIM GRADE IS 1093.27.
EXISTING CASTING CAN BE SALVAGED.
CONTRACTOR SHALL COMPLY WITH ALL CITY OF STEVENS POINT STANDARD SPECIFICATIONS AND REQUIREMENTS.
284 LF OF 8" PVC WATERMAIN
12 LF OF 6" PVC WATERMAIN
MAINTAIN 8 FT OF
SEPARATION AT ALL TIMES
8' MIN
13
Page 49 of 116
1083
1084
1086
1088
1090
1092
1094
1096
1083
1084
1086
1088
1090
1092
1094
1096
199 200 201 202 203 204 205 205
8199+59.80
OFF 0.00
8
RIM: 1094.68
SUMP: 1086.02
DEPTH: 8.66
E INV OUT: 1086.02
249.9' of SANITARY SEWER PVC 8 INCH @ 0.40%
7202+09.74
OFF 0.00
7
RIM: 1092.99
SUMP: 1084.93
DEPTH: 8.06
W INV IN: 1085.03
E INV OUT: 1084.93
277.4' of SANITARY SEWER PVC 8 INCH @ 0.40%
6204+98.10
OFF -4.92
6
RIM: 1092.45
SUMP: 1071.62
DEPTH: 20.83
N INV IN: 1071.33
W INV IN: 1083.82
S INV OUT: 1071.33
MH
MH
GUYGUY
GUY POLE
GUY POLE
GUYGUY
GUYGUYMH
GUY
GUYGUY
OH
OH
OH
OH
199
200
201
202
203
204
205
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN SAN SAN SAN SAN SAN SAN SAN SAN
W
W
W
W
W
8"WM
8"WMWWWWWW 8"WM
W
W
W
W
W
W
8"WM
6"WM6"WM
W
W
W
W
W
W
W
W
W
W
W
W
W
8-INCH 22.5° BEND
STA 202+11.20
8-INCH 22.5° BEND
STA 204+83.63
8-INCH GATE VALVE
STA 204+86.81
8 X 8-INCH TEE
STA 204+90.01
8 X 6-INCH REDUCER
STA 199+51.76
6-INCH GATE VALVE
STA 199+45.76
HYDRANT 6.0'
BURY DEPTH
STA 199+39.76
WISDOT/CADDS SHEET 44
E
P:\PROJECTS_CURRENT\PORTAGE\PRITCHARD\WEST ZINDA-RIVER SUBDIVISION - 2025\ACAD\PRICHARD_UTILITYPLANPROFILE.DWGFILE NAME : 6/22/2026 1:35 PMPLOT DATE : PLOT BY : DEXTER KAETTERHENRY
PROJECT:
PLOT NAME :
UTILITY PLAN: SHEET
PLOT SCALE : 1 IN:40 FT
RIVER WOOD WEST SUBDIVISION WEST RIVER DRIVE ENTRANCE
LAYOUT NAME - 04
SAN MH 8
STA 199+59.8
OFFSET = 0' RT
RIM = 1094.68
INV OUT = 1086.02
SAN MH 7
STA 202+09.7
OFFSET = 0' RT
RIM = 1092.99
INV IN = 1085.03
INV OUT = 1084.93
SAN MH 6
STA 204+98.1
OFFSET = 4.9' LT
RIM = 1094.84
INV IN (N)= 1071.33
INV IN (W) = 1083.82
INV OUT = 1071.33
(DROP MANHOLE REQUIRED)
EX SAN MH 4
STA 204+99.3
OFFSET = 115.9' LT
RIM = 1094.54
INV OUT = 1071.34
EX SAN MH 5
STA 204+95.8
OFFSET = 203.6' RT
RIM = 1088.81
INV OUT = 1071.31
POTENTIAL DRIVEWAY
LOCATION, TYP
I
H
Q
J
G
K
L
M
N O
P
R
F
SANITARY LATERALS
LATERAL KEYNOTE CONNECTION TO MAIN
STATION
CONNECTION TO MAIN
OFFSET
F 203+55 4.1' LT
G 202+24 5.3' LT
H 201+05 0.0' RT
I 200+04 0.0' RT
J 199+86 0.0' RT
K 199+74 0.0' RT
L 199+64 0.0' RT
M 199+77 0.0' RT
N 199+90 0.0' RT
O 199+99 0.0' RT
P 200+19 0.0' RT
Q 200+68 0.0' RT
R 202+72 20.6' LT
526 LF OF 8" PVC WATERMAIN
12 LF OF 8" PVC WATERMAIN
MAINTAIN 8 FT OF
SEPARATION AT ALL TIMES
UTILITY NOTES:
CONTRACTOR SHALL VERIFY DEPTHS OF EXISTING SANITARY
SEWER AND WATERMAIN PRIOR TO INSTALLATION.
SANITARY AND WATER LATERAL LOCATIONS CAN BE REVISED
BY ENGINEER TO FIT FIELD CONDITIONS.
ALL WATER LATERALS SHALL BE 1" POLYETHYLENE.
ALL SANITARY LATERALS SHALL BE 6" PVC.
CONNECTION TO EXISTING SANITARY WILL REQUIRE NEW
DROP MANHOLE.
CONTRACTOR SHALL COMPLY WITH ALL CITY OF STEVENS
POINT STANDARD SPECIFICATIONS AND REQUIREMENTS.
8' MIN
14
Page 50 of 116
SAN
OH
OH
OH
OH
OH
OH
OH
OH
OH
98 99 100
101
102
103
104
104
WISDOT/CADDS SHEET 42
E
P:\PROJECTS_CURRENT\PORTAGE\PRITCHARD\WEST ZINDA-RIVER SUBDIVISION - 2025\ACAD\PRICHARD_GRADINGPLAN.DWGFILE NAME : 6/23/2026 10:14 AMPLOT DATE : PLOT BY : DEXTER KAETTERHENRY
2
PROJECT:
PLOT NAME :
2
SHEET
PLOT SCALE : Custom
RIVER WOOD WEST SUBDIVISION GRADING PLAN: WEST ZINDA DRIVE ENTRANCE
LAYOUT NAME - Plan 1 IN 20 FT
1096
1095
1094
1094
1095
1094
1095
1096
1097
1098
1095
1094
1093
1092
1093
1092 1091
1090 1089
1095
1092
1086
1094
1095
1095
1094
1094
1094 1093
1093
1095
1095
10941095
1095
1094
1094
1093
1094
1095
1094
1094
1093
1095
1095
FF = 1095.5
FF = 1095.5
FF = 1095.5
FF = 1095.5
FF = 1095.5
BERM ELEVATION = 1094.25
BERM ELEVATION = 1094.25
GRADING NOTES:
SEE CROSS SECTIONS FOR MORE INFORMATION ON
ROADWAY AND DITCH GRADES.
SEE CUL-DE-SAC CONSTRUCTION DETAIL FOR FINAL
PAVEMENT GRADES.
NO GRADING IS ALLOWED OUTSIDE OF THE SLOPE
INTERCEPT WHERE WETLANDS ARE PRESENT.
WETLAND IMPACTS ARE PERMITTED.
ALL SLOPES 4:1 UNLESS NOTED OTHERWISE.
1" = 60 FT
0 60 120
GRADING LEGEND:
EXISTING CONTOUR
PROPOSED CONTOUR
1087
1083
BERM ELEVATION = 1093.25
1091
1090
1093
15
Page 51 of 116
MH
MH
MH
GUYGUY
GUY POLE
GUY POLE
GUYGUY
GUYGUYMH GUY
GUYGUY
OH
OH
OH
OH
OH
OH
OH
OH
OH
199
200
201
202
203
204 205
205
WISDOT/CADDS SHEET 42
E
P:\PROJECTS_CURRENT\PORTAGE\PRITCHARD\WEST ZINDA-RIVER SUBDIVISION - 2025\ACAD\PRICHARD_GRADINGPLAN.DWGFILE NAME : 6/23/2026 10:15 AMPLOT DATE : PLOT BY : DEXTER KAETTERHENRY
2
PROJECT:
PLOT NAME :
2
SHEET
PLOT SCALE : Custom
RIVER WOOD WEST SUBDIVISION GRADING PLAN: WEST RIVER DRIVE ENTRANCE
LAYOUT NAME - Plan 1 IN 20 FT (2)
1089
1088
1090
1091
1092
1088
1089
1090
1091
1092
1093
1094
1095
1093
1093
1093
1094 1095
1096
1096
1092
1090
1089
1091
1092
1093
1100
1099
1098
1101
1102
1103
1102
1101
1101
1100
1099
1098
1097
1096
1095
1094
1093
1092
1102110111001099
1098
1097
1096
1095
FF = 1094.5
FF = 1095.5
FF = 1094.5
FF = 1094.5
FF = 1094.5
FF = 1094.5
FF = 1093.5
FF = 1094.5
FF = 1096.5
FF = 1096.5
FF = 1097.5
FF = 1098.5
FF = 1098.5
1094
1093
1092
1091
1090
1089
1088
1087
1086
1085
1086
1085
1084
1084
1085
1085
1084
1079
1087 1088
1089
1090 1091 1092 1093
1093
1093
1092
1091
1090
1094
1093 1092
1094
1092
1093
1093 1093
1093
1092
1092
1093
1097
1095
1095
1094
1093
1092
1102
1103
1097
1098 1099
1100 1101
1102
1096
10971098
10991100
1101
1102
1103
1096
10971098
1096 1097
1098 1096
1097
1096
1095
1095
1095
1094
1094
1093
1092
1090
1091
1092
1093
1094
1094
1089
1093
1094
1094
1094
1094
1094
BERM ELEVATION = 1094.25
BERM ELEVATION
= 1094.25
BERM ELEVATION
= 1093.25
BERM ELEVATION = 1095.25
BERM ELEVATION = 1096.25
GRADING NOTES:
SEE CROSS SECTIONS FOR MORE INFORMATION ON
ROADWAY AND DITCH GRADES.
SEE CUL-DE-SAC CONSTRUCTION DETAIL FOR FINAL
PAVEMENT GRADES.
NO GRADING IS ALLOWED OUTSIDE OF THE SLOPE
INTERCEPT WHERE WETLANDS ARE PRESENT.
WETLAND IMPACTS ARE PERMITTED.
ALL SLOPES 4:1 UNLESS NOTED OTHERWISE.1" = 60 FT
0 60 120
GRADING LEGEND:
EXISTING CONTOUR
PROPOSED CONTOUR
1087
1083
1083
1088
BERM ELEVATION
= 1086.251086
1086
1079
1087
1086
1085
1083
REALIGNED TRAIL
16
Page 52 of 116
1092
1094
1096
1098
1100
1102
1092
1094
1096
1098
1100
1102
1095.61 1095.61
1095.80 1095.80
1095.77 1095.77
1095.10 1095.10
1094.42 1094.42
1093.72 1093.72
1093.64 1093.64
1093.52 1093.52
1093.56 1093.56
1093.38 1093.38
1093.31 1093.31
1093.37 1093.37
1093.44 1093.44
1093.79 1093.79
1094.12 1094.12
1094.48 1094.48
1095.58 1095.58
1096.71 1096.71
1097.59 1097.59
1098.04 1098.04
1098.20 1098.20
1097.57 1097.57
1095.77 1095.77
1095.76 1095.76
1095.74 1095.74
1095.73 1095.73
1095.71 1095.71
1095.70 1095.70
1095.68 1095.68
1095.67 1095.67
1095.66 1095.66
1095.64 1095.64
1095.63 1095.63
1095.61 1095.61
1095.60 1095.60
1095.58 1095.58
1095.57 1095.57
1095.32 1095.32
1095.07 1095.07
1095.01 1095.01
1095.31 1095.31
99 100 101 102 103 104 105
-0.06%
-1.00% 1.17%
VPI STA 100+00.00
VPI EL 1095.77
VPI STA 103+50.00
VPI EL 1095.57
VPI STA 104+16.00
VPI EL 1094.91
VPI STA 104+66.58
VPI EL 1095.50
SAN
OH
OH
OH
OH
OH
OH
OH
OH
EP: 104+79.58
PC: 101+64.28
PC: 100+03.38
PT: 104+12.37
PT: 100+41.25
100
101
102
103
104
WISDOT/CADDS SHEET 44
E
P:\PROJECTS_CURRENT\PORTAGE\PRITCHARD\WEST ZINDA-RIVER SUBDIVISION - 2025\ACAD\PRICHARD_PLANPROFILE.DWGFILE NAME : 6/22/2026 2:23 PMPLOT DATE : PLOT BY : DEXTER KAETTERHENRY
PROJECT:
PLOT NAME :
PLAN AND PROFILE: SHEET
PLOT SCALE : 1 IN:40 FT
RIVER WOOD WEST SUBDIVISION WEST ZINDA DRIVE ENTRANCE
LAYOUT NAME - 01
INV = 1093.18
INV = 1093.06
SWALE/INV = 1092.96
INV = 1093.13
INV = 1093.23
INV = 1093.42
INV = 1093.53
INV = 1093.73
INV = 1093.95
HP
1094.14
INV = 1093.27
+53, 19' RT
INV = 1093.27
+53, 19' LT
1096
1095
1094
1094
1095
1094
1095
1096
1097
1095
1094
1093
1092
1093
1092 1091
1090 1089
1095
1091
1091
1092
EXISTING WETLAND
BOUNDARY
STORMWATER RELIEF
1092.75
STORMWATER DETAIL
SEE DETAIL
PROPERTY LINE
PROPERTY LINE
BEGIN CONSTRUCTION
STA 100+00
MATCH EXISTING
SAWCUT REQ'D
1096
PLAN AND PROFILE NOTES:
SEE CROSS SECTIONS FOR MORE
INFORMATION ON ROADWAY AND DITCH
GRADES.
NO GRADING IS ALLOWED OUTSIDE OF THE
SLOPE INTERCEPT WHERE WETLANDS ARE
PRESENT. WETLAND IMPACTS ARE
PERMITTED.
SLOPE INTERCEPT
1" = 60 FT
0 60 120 1095.50
+25
1096.03
+00
1096.20
+75
1096.05
+50
1095.50
1094.57
+501095.31
1094.30
+75
1094.14
+00
1095.22
+251095.32
1095.01
1086
1093
BERM ELEVATION =
1093.25
1091
1090
1093
BERM ELEVATION =
1093.25
1092
1093
1093
1092
1091
R=50'
PAVEMENT REPLACEMENT
STA 97+70 TO STA 100+00
REMOVE EXISTING ASPHALT AND
REPAVE WITH 4" OF HMA PAVEMENT
SEE TYPICAL SECTIONS
17
Page 53 of 116
1090
1092
1094
1096
1098
1100
1090
1092
1094
1096
1098
1100
1094.72 1094.72
1094.64 1094.64
1094.54 1094.54
1094.47 1094.47
1094.87 1094.87
1095.65 1095.65
1095.60 1095.60
1094.95 1094.95
1094.84 1094.84
1094.50 1094.50
1094.01 1094.01
1093.52 1093.52
1093.26 1093.26
1093.57 1093.57
1093.64 1093.64
1093.46 1093.46
1094.51 1094.51
1095.09 1095.09
1093.57 1093.57
1094.28 1094.28
1093.78 1093.78
1092.47 1092.47
1092.40 1092.40
1094.72 1094.72
1094.63 1094.63
1094.54 1094.54
1094.29 1094.29
1094.04 1094.04
1093.79 1093.79
1093.54 1093.54
1093.29 1093.29
1093.09 1093.09
1092.98 1092.98
1092.96 1092.96
1093.04 1093.04
1093.17 1093.17
1093.29 1093.29
1093.42 1093.42
1093.54 1093.54
1093.67 1093.67
1093.70 1093.70
1093.57 1093.57
1093.26 1093.26
1092.79 1092.79
1092.22 1092.22
199 200 201 202 203 204 205
0.50%
-2.26%
-0.36%
-1.00%
VPI STA 199+50.00
VPI EL 1094.72
VPI STA 200+00.00
VPI EL 1094.54
VPI STA 204+80.99
VPI EL 1092.09
VPC STA 203+50.00
VPC EL 1093.67
VPI STA 204+00.00
VPI EL 1093.92
VPT STA 204+50.00
VPT EL 1092.79
VPC STA 201+24.88
VPC EL 1093.29
VPI STA 201+74.88
VPI EL 1092.79
VPT STA 202+24.88
VPT EL 1093.04
HP STA 203+68.12
HP EL 1093.71
LP STA 201+91.56
LP EL 1092.96
VCL = 100.00'
K = 36.23
VCL = 100.00'
K = 66.63
MH
MH
GUYGUY
GUY POLE
GUY POLE
GUYGUY
GUYGUYMH
GUY
GUYGUY
OH
OH
OH
OH
OH
OH
199
200
201
202
203
204
205
EP: 205+14.34PC: 202+53.46
PC: 203+78.03
PT: 203+30.53
PT: 204+48.24
OH
OH
WISDOT/CADDS SHEET 44
E
P:\PROJECTS_CURRENT\PORTAGE\PRITCHARD\WEST ZINDA-RIVER SUBDIVISION - 2025\ACAD\PRICHARD_PLANPROFILE.DWGFILE NAME : 6/22/2026 2:16 PMPLOT DATE : PLOT BY : DEXTER KAETTERHENRY
PROJECT:
PLOT NAME :
PLAN AND PROFILE: SHEET
PLOT SCALE : 1 IN:40 FT
RIVER WOOD WEST SUBDIVISION WEST RIVER DRIVE ENTRANCE
LAYOUT NAME - 02
201+92, 19' LT
INV = 1090.80
201+92, 19' RT
INV = 1090.60
SWALE = 1094.24
(HIGH-POINT)
INV = 1093.52
INV = 1093.76
INV = 1093.87
INV = 1094.11
INV = 1093.05
INV = 1093.26INV = 1093.90
INV = 1092.41
INV = 1093.37
INV = 1093.13
INV = 1093.02
INV = 1092.78
INV = 1092.72
INV = 1092.48
INV = 1092.43
INV = 1092.19
INV = 1092.12
INV = 1091.86
INV = 1091.74
INV = 1091.85
INV = 1090.60
INV = 1091.25
INV = 1091.65
INV = 1091.75
INV = 1093.70
INV = 1093.70
1085
1086
1087
1088
1088
1089
1089
1090
1090
1086
1085
1088
1087
1086
1085
1084
1084
1084
1087
1086
1085
1084
1088
1089
1090
1090
1089
1091
1092
1093
1100
1099
1098
1101
1102
1104
1105
1103
1102
1101 1101 11001099
1098
1097
1096
1095
1094
1093
1092
110211011100109910981097
10961095
STORMWATER DETAIL
1" = 60 FT
0 60 120
PLAN AND PROFILE NOTES:
SEE CROSS SECTIONS FOR MORE
INFORMATION ON ROADWAY AND DITCH
GRADES.
NO GRADING IS ALLOWED OUTSIDE OF THE
SLOPE INTERCEPT WHERE WETLANDS ARE
PRESENT. WETLAND IMPACTS ARE
PERMITTED.
1082
1083
1082
1081
1083
1080
1081
1079
1083
1085
1094.05
+75
1094.72
1094.63
1094.54
1095.02
+75 1095.46
+00 1094.50
+25
1093.95
+50
1093.78
+50
1094.03
1094.29
1093.65
+25
1093.54
+00
1089
1090
1079
1080
BERM ELEVATION = 1086.25
STORMWATER RELIEF = 1085.75
R=50'
W14-2
OUTLET
NO
30"X30"
INV = 1091.00
INV = 1090.90
REALIGN TRAIL TO CONNECT TO ROADWAY
6" BASE AGGREGATE DENSE 3/4-INCH
(8' WIDE / 75' LONG)
+51.8, 85.9' RT
1093.16
+68.5, 11' RT
1092.74
18
Page 54 of 116
101+00.00 101+00.00
1085
1090
1095
1100
1085
1090
1095
1100
0 10 20 30 40 50 60 70 800-10-20-30-40-50-60-70
24.60
1093.63
-25.91
1093.64
-11.00
1095.49
11.00
1095.49
0.00
1095.71
0.00
1094.38
13.00
1095.41
18.62
1094.01
16.00
1094.66
19.00
1094.66
0.00
1095.71
0.00
1094.38
-13.00
1095.41
-18.62
1094.01
-16.00
1094.66
-19.00
1094.66
101+50.00 101+50.00
1085
1090
1095
1100
1085
1090
1095
1100
0 10 20 30 40 50 60 70 800-10-20-30-40-50-60-70
24.66
1093.66
-26.45
1093.48
-11.00
1095.46
11.00
1095.46
0.00
1095.68
0.00
1094.35
13.00
1095.38
18.62
1093.98
17.00
1094.38
20.00
1094.38
0.00
1095.68
0.00
1094.35
-13.00
1095.38
-18.62
1093.98
-17.00
1094.38
-20.00
1094.38
102+00.00 102+00.00
1085
1090
1095
1100
1085
1090
1095
1100
0 10 20 30 40 50 60 70 800-10-20-30-40-50-60-70
26.17
1093.88
-28.94
1093.41
-11.00
1095.44
11.00
1095.44
0.00
1095.66
0.00
1094.32
13.00
1095.36
18.62
1093.95
18.00
1094.10
21.00
1094.10
0.00
1095.66
0.00
1094.32
-13.00
1095.36
-18.62
1093.95
-18.00
1094.10
-21.00
1094.10
102+50.00 102+50.00
1085
1090
1095
1100
1085
1090
1095
1100
0 10 20 30 40 50 60 70 800-10-20-30-40-50-60-70
27.87
1094.04
-30.96
1093.46
-11.00
1095.41
11.00
1095.41
0.00
1095.63
0.00
1094.29
13.00
1095.33
18.62
1093.92
19.00
1093.83
22.00
1093.83
0.00
1095.63
0.00
1094.29
-13.00
1095.33
-18.62
1093.92
-19.00
1093.83
-22.00
1093.83
WISDOT/CADDS SHEET 49
E
P:\PROJECTS_CURRENT\PORTAGE\PRITCHARD\WEST ZINDA-RIVER SUBDIVISION - 2025\ACAD\PRITCHARD_CORR.DWGFILE NAME : 5/4/2026 4:04 PMPLOT DATE : PLOT BY : DEXTER KAETTERHENRY
9
PROJECT: RIVER WOOD WEST SUBDIVISION
PLOT NAME :
9
CROSS SECTIONS: SHEET
PLOT SCALE :
WEST ZINDA DRIVE ENTRANCE
PLOT SCALE :
10 FT
10 FT
LAYOUT NAME - Model
1 IN:10 FT HORZ. / 1 IN:10 FT VERT.
19
Page 55 of 116
103+00.00 103+00.00
1085
1090
1095
1100
1085
1090
1095
1100
0 10 20 30 40 50 60 70 800-10-20-30-40-50-60-70
25.37
1094.34
-26.75
1093.90
-11.00
1095.38
11.00
1095.38
0.00
1095.60
0.00
1094.26
13.00
1095.30
18.62
1093.89
20.00
1093.55
23.00
1093.55
0.00
1095.60
0.00
1094.26
-13.00
1095.30
-18.62
1093.89
-20.00
1093.55
-23.00
1093.55
103+50.00 103+50.00
1085
1090
1095
1100
1085
1090
1095
1100
0 10 20 30 40 50 60 70 800-10-20-30-40-50-60-70
30.65
1095.48
-28.71
1094.44
-11.00
1095.35
11.00
1095.35
0.00
1095.57
0.00
1094.23
13.00
1095.27
18.62
1093.86
21.00
1093.27
24.00
1093.27
0.00
1095.57
0.00
1094.23
-13.00
1095.27
-18.62
1093.86
-21.00
1093.27
-24.00
1093.27
104+00.00 104+00.00
1085
1090
1095
1100
1085
1090
1095
1100
0 10 20 30 40 50 60 70 800-10-20-30-40-50-60-70
72.23
1096.79
-67.52
1094.19
-48.00
1096.03
46.30
1094.14
0.00
1095.07
0.00
1093.73
48.30
1094.06
53.92
1092.66
55.30
1092.31
58.30
1092.31
0.00
1095.07
0.00
1093.73
-50.00
1095.95
-55.62
1094.54
-57.00
1094.20
-60.00
1094.20
104+50.00 104+50.00
1085
1090
1095
1100
1085
1090
1095
1100
0 10 20 30 40 50 60 70 800-10-20-30-40-50-60-70
58.43
1095.71
-54.02
1094.84
-37.00
1096.05
37.00
1094.57
0.00
1095.31
0.00
1093.97
39.00
1094.49
44.62
1093.08
46.00
1092.74
49.00
1092.74
0.00
1095.31
0.00
1093.97
-39.00
1095.97
-44.62
1094.56
-46.00
1094.22
-49.00
1094.22
WISDOT/CADDS SHEET 49
E
P:\PROJECTS_CURRENT\PORTAGE\PRITCHARD\WEST ZINDA-RIVER SUBDIVISION - 2025\ACAD\PRITCHARD_CORR.DWGFILE NAME : 5/4/2026 4:05 PMPLOT DATE : PLOT BY : DEXTER KAETTERHENRY
9
PROJECT: RIVER WOOD WEST SUBDIVISION
PLOT NAME :
9
CROSS SECTIONS: SHEET
PLOT SCALE :
WEST ZINDA DRIVE ENTRANCE
PLOT SCALE :
10 FT
10 FT
LAYOUT NAME - Model
1 IN:10 FT HORZ. / 1 IN:10 FT VERT.
20
Page 56 of 116
200+00.00 200+00.00
1085
1090
1095
1100
1105
1085
1090
1095
1100
1105
0 10 20 30 40 50 60 70 800-10-20-30-40-50-60-70
65.87
1092.83
-50.00
1095.54
50.00
1093.54
0.00
1094.54
0.00
1093.21
52.00
1093.46
57.62
1092.05
59.00
1091.71
62.00
1091.71
0.00
1094.54
0.00
1093.21
-52.00
1095.46
-56.49
1094.34
-57.87
1093.99
-60.87
1093.99
200+50.00 200+50.00
1085
1090
1095
1100
1105
1085
1090
1095
1100
1105
0 10 20 30 40 50 60 70 800-10-20-30-40-50-60-70
30.58
1093.64
-53.02
1099.08
-13.00
1093.78
13.00
1093.78
0.00
1094.04
0.00
1092.71
15.00
1093.70
20.62
1092.29
22.00
1091.95
25.00
1091.95
0.00
1094.04
0.00
1092.71
-15.00
1093.70
-20.62
1092.29
-22.00
1091.95
-25.00
1091.95
201+00.00 201+00.00
1085
1090
1095
1100
1105
1085
1090
1095
1100
1105
0 10 20 30 40 50 60 70 800-10-20-30-40-50-60-70
30.76
1093.91
-52.88
1099.08
-11.00
1093.32
11.00
1093.32
0.00
1093.54
0.00
1092.21
13.00
1093.24
18.62
1091.83
20.00
1091.49
23.00
1091.49
0.00
1093.54
0.00
1092.21
-13.00
1093.24
-18.62
1091.83
-20.00
1091.49
-23.00
1091.49
WISDOT/CADDS SHEET 49
E
P:\PROJECTS_CURRENT\PORTAGE\PRITCHARD\WEST ZINDA-RIVER SUBDIVISION - 2025\ACAD\PRITCHARD_CORR.DWGFILE NAME : 5/4/2026 4:06 PMPLOT DATE : PLOT BY : DEXTER KAETTERHENRY
9
PROJECT: RIVER WOOD WEST SUBDIVISION
PLOT NAME :
9
CROSS SECTIONS: SHEET
PLOT SCALE :
WEST RIVER DRIVE ENTRANCE
PLOT SCALE :
10 FT
10 FT
LAYOUT NAME - Model
1 IN:10 FT HORZ. / 1 IN:10 FT VERT.
21
Page 57 of 116
201+50.00 201+50.00
1085
1090
1095
1100
1105
1085
1090
1095
1100
1105
0 10 20 30 40 50 60 70 800-10-20-30-40-50-60-70
32.40
1094.00
-54.99
1099.16
-11.00
1092.87
11.00
1092.87
0.00
1093.09
0.00
1091.75
13.00
1092.79
18.62
1091.38
20.00
1091.04
23.00
1091.04
0.00
1093.09
0.00
1091.75
-13.00
1092.79
-18.62
1091.38
-20.00
1091.04
-23.00
1091.04
202+00.00 202+00.00
1085
1090
1095
1100
1105
1085
1090
1095
1100
1105
0 10 20 30 40 50 60 70 800-10-20-30-40-50-60-70
31.75
1093.66
-50.25
1097.85
-11.00
1092.74
11.00
1092.74
0.00
1092.96
0.00
1091.63
13.00
1092.66
18.62
1091.26
20.00
1090.91
23.00
1090.91
0.00
1092.96
0.00
1091.63
-13.00
1092.66
-18.62
1091.26
-20.00
1090.91
-23.00
1090.91
202+50.00 202+50.00
1080
1085
1090
1095
1100
1105
1080
1085
1090
1095
1100
1105
0 10 20 30 40 50 60 70 800-10-20-30-40-50-60-70
30.22
1093.35
-37.15
1094.78
-11.00
1092.95
11.00
1092.95
0.00
1093.17
0.00
1091.83
13.00
1092.87
18.62
1091.46
20.00
1091.11
23.00
1091.11
0.00
1093.17
0.00
1091.83
-13.00
1092.87
-18.62
1091.46
-20.00
1091.11
-23.00
1091.11
WISDOT/CADDS SHEET 49
E
P:\PROJECTS_CURRENT\PORTAGE\PRITCHARD\WEST ZINDA-RIVER SUBDIVISION - 2025\ACAD\PRITCHARD_CORR.DWGFILE NAME : 5/4/2026 4:06 PMPLOT DATE : PLOT BY : DEXTER KAETTERHENRY
9
PROJECT: RIVER WOOD WEST SUBDIVISION
PLOT NAME :
9
CROSS SECTIONS: SHEET
PLOT SCALE :
WEST RIVER DRIVE ENTRANCE
PLOT SCALE :
10 FT
10 FT
LAYOUT NAME - Model
1 IN:10 FT HORZ. / 1 IN:10 FT VERT.
22
Page 58 of 116
203+00.00 203+00.00
1080
1085
1090
1095
1100
1105
1080
1085
1090
1095
1100
1105
0 10 20 30 40 50 60 70 800-10-20-30-40-50-60-70
28.04
1092.88
-37.97
1095.23
-11.00
1093.20
11.00
1093.20
0.00
1093.42
0.00
1092.08
13.00
1093.12
18.62
1091.71
20.00
1091.36
23.00
1091.36
0.00
1093.42
0.00
1092.08
-13.00
1093.12
-18.62
1091.71
-20.00
1091.36
-23.00
1091.36
203+50.00 203+50.00
1080
1085
1090
1095
1100
1105
1080
1085
1090
1095
1100
1105
0 10 20 30 40 50 60 70 800-10-20-30-40-50-60-70
32.69
1094.68
-30.39
1091.64
-11.00
1093.45
11.00
1093.45
0.00
1093.67
0.00
1092.33
13.00
1093.37
18.62
1091.96
20.00
1091.61
23.00
1091.61
0.00
1093.67
0.00
1092.33
-13.00
1093.37
-18.62
1091.96
-20.00
1091.61
-23.00
1091.61
204+00.00 204+00.00
1080
1085
1090
1095
1080
1085
1090
1095
0 10 20 30 40 50 60 70 800-10-20-30-40-50-60-70
33.17
1094.74
-28.69
1091.97
-11.00
1093.35
11.00
1093.35
0.00
1093.57
0.00
1092.24
13.00
1093.27
18.62
1091.86
20.00
1091.52
23.00
1091.52
0.00
1093.57
0.00
1092.24
-13.00
1093.27
-18.62
1091.86
-20.00
1091.52
-23.00
1091.52
204+50.00 204+50.00
1080
1085
1090
1095
1080
1085
1090
1095
0 10 20 30 40 50 60 70 800-10-20-30-40-50-60-70
33.35
1094.02
-30.41
1092.71
-11.00
1092.57
11.00
1092.57
0.00
1092.79
0.00
1091.45
13.00
1092.49
18.62
1091.08
20.00
1090.73
23.00
1090.73
0.00
1092.79
0.00
1091.45
-13.00
1092.49
-18.62
1091.08
-20.00
1090.73
-23.00
1090.73
WISDOT/CADDS SHEET 49
E
P:\PROJECTS_CURRENT\PORTAGE\PRITCHARD\WEST ZINDA-RIVER SUBDIVISION - 2025\ACAD\PRITCHARD_CORR.DWGFILE NAME : 5/4/2026 4:08 PMPLOT DATE : PLOT BY : DEXTER KAETTERHENRY
9
PROJECT: RIVER WOOD WEST SUBDIVISION
PLOT NAME :
9
CROSS SECTIONS: SHEET
PLOT SCALE :
WEST RIVER DRIVE ENTRANCE
PLOT SCALE :
10 FT
10 FT
LAYOUT NAME - Model
1 IN:10 FT HORZ. / 1 IN:10 FT VERT.
10 FT
10 FT
23
Page 59 of 116
8
7
11
10
18
3
45
6
12
13
14 15
16
17
9
2
1
MH
MH
GUYGUY
GUY POLE
GUY POLE
GUYGUY
GUYGUYMH
GUY
GUYGUY
SAN
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
98 99 100 101 102
103
104
104
199
200
201
202
203
204
205
205
OUTLOT 2
TRAIL
TRAIL
Not included in area calculation
REPLAT OF RIVERWOOD WEST SUBDIVISION - (OVERVIEW SHEET - DEVELOPABLE AREAS)
1 IN = 100 FT
0 50 100
OUTLOT 2
Not included in area calculation
29,464 SF
0.68 AC
23,759 SF
0.55 AC
9,171 SF
0.21 AC
14,750 SF
0.34 AC
10,130 SF
0.23 AC
11,001 SF
0.25 AC
8,453 SF
0.19 AC
12,263 SF
0.28 AC
11,634 SF
0.27 AC
10,382 SF
0.24 AC
23,845 SF
0.55 AC
19,382 SF
0.45 AC
11,356 SF
0.26 AC
15,959 SF
0.37 AC
11,441 SF
0.26 AC
12,146 SF
0.28 AC
19,127 SF
0.44 AC
14,413 SF
0.33 AC
Page 60 of 116
State of Wisconsin
DEPARTMENT OF NATURAL RESOURCES
West Central Region Headquarters
1300 W. Clairemont Ave
Eau Claire, WI 54701
dnr.wi.gov
wisconsin.gov
Tony Evers, Governor
Karen Hyun, Ph.D., Secretary
Telephone 715-839-3700
Toll Free 1-888-936-7463
TTY Access via relay - 711
July 9, 2026
William Pritchard
The Elizabeth Trust
3364 Cottage Hill Drive
Green Bay WI 54311
SUBJECT: Coverage Under WPDES General Permit No. WI-S067831-06: Construction Site Storm Water Runoff
Permittee Name: The Elizabeth Trust
Site Name: River Wood West Subdivision
FIN: 105558
Dear Permittee:
The Wisconsin Department of Natural Resources received your Water Resources Application for Project Permits or Notice of
Intent, on June 05, 2026, for the River Wood West Subdivision site and has evaluated the information provided regarding
storm water discharges from your construction site. We have determined that your construction site activities will be
regulated under ch. 283, Wis. Stats., ch. NR 216, Wis. Adm. Code, and in accordance with Wisconsin Pollutant Discharge
Elimination System (WPDES) General Permit No. WI-S067831-06, Construction Site Storm Water Runoff. All erosion
control and storm water management activities undertaken at the site must be done in accordance with the terms and
conditions of the general permit.
The Start Date of permit coverage for this site is July 09, 2026. The maximum period of permit coverage for this site is
limited to 3 years from the Start Date. Therefore, permit coverage automatically expires and terminates 3 years from the
Start Date and storm water discharges are no longer authorized unless another Notice of Intent and application fee to retain
coverage under this permit or a reissued version of this permit is submitted to the Department 14 working days prior to
expiration.
A copy of the general permit along with extensive storm water information including technical standards, forms, guidance
and other documents is accessible on the Department’s storm water program Internet site. To obtain a copy of the general
permit, please download it and the associated documents listed below from the following Department Internet site:
http://dnr.wi.gov/topic/stormwater/construction/forms.html
• Construction Site Storm Water Runoff WPDES general permit No. WI-S067831-06
• Construction site inspection report form
• Notice of Termination form
If, for any reason, you are unable to access these documents over the Internet, please contact me and I will send them to you.
To ensure compliance with the general permit, please read it carefully and be sure you understand its contents. Please take
special note of the following requirements (This is not a complete list of the terms and conditions of the general permit.):
1. The Construction Site Erosion Control Plan and Storm Water Management Plan that you completed prior to
submitting your permit application must be implemented and maintained throughout construction. Failure to do so may
result in enforcement action by the Department.
Page 61 of 116
Page 2
2. Construction dewatering discharges from an area subject to remedial action operations or from an area containing
contamination that would be subject to remedial action operations are not eligible for coverage under this permit
(section 1.1.2.3). Discharges may be eligible for coverage under the Contaminated Groundwater from Remedial Action
Operations General Permit (WI-0046566-07-0).
3. The general permit requires that erosion and sediment controls be routinely inspected at least every 7 days, and
within 24 hours after a rainfall event of 0.5 inches or greater. Weekly written reports of all inspections must be
maintained. The reports must contain the following information:
a. Date, time, and exact place of inspection;
b. Name(s) of individual(s) performing inspection;
c. An assessment of the condition of erosion and sediment controls;
d. A description of any erosion and sediment control implementation and maintenance performed;
e. A description of the site’s present phase of construction.
4. A Certificate of Permit Coverage must be posted in a conspicuous place on the construction site. The Certificate
of Permit Coverage (WDNR Publication # WT-813) is enclosed for your use.
5. When construction activities have ceased and the site has undergone final stabilization, a Notice of Termination
(NOT) of coverage under the general permit must be submitted to the Department.
It is important that you read and understand the terms and conditions of the general permit because they have the force of la w
and apply to you. Your project may lose its permit coverage if you do not comply with its terms and conditions. The
Department may also withdraw your project from coverage under the general permit and require that you obtain an individual
WPDES permit instead, based on the Department's own motion, upon the filing of a written petition by any person, or upon
your request.
If you believe that you have a right to challenge this decision to grant permit coverage, you should know that the Wisconsin
statutes and administrative rules establish time periods within which requests to review Department decisions must be filed.
For judicial review of a decision pursuant to ss. 227.52 and 227.53, Wis. Stats., you have 30 days after the decision is mail ed,
or otherwise served by the Department, to file your petition with the appropriate circuit court and serve the petition on the
Department. Such a petition for judicial review must name the Department of Natural Resources as the respondent.
To request a contested case hearing pursuant to s. 227.42, Wis. Stats., you have 30 days after the decision is mailed, or
otherwise served by the Department, to serve a petition for hearing on the Secretary of the Department of Natural Resources.
All requests for contested case hearings must be made in accordance with s. NR 2.05(5), Wis. Adm. Code, and served on the
Secretary in accordance with s. NR 2.03, Wis. Adm. Code. The filing of a request for a contested case hearing is not a
prerequisite for judicial review and does not extend the 30-day period for filing a petition for judicial review.
Thank you for your cooperation with the Construction Site Storm Water Discharge Permit Program. If you have any
questions concerning the contents of this letter or the general permit, please contact Amanda Harvey at (715) 679-0694.
Sincerely,
Ethan McGowan, PE
Regional Stormwater Engineer
Northern & West Central Region
ENCLOSURE: Certificate of Permit Coverage
Page 62 of 116
UNDER THE
WPDES CONSTRUCTION SITE STORM WATER RUNOFF PERMIT
Permit No. WI-S067831-06
Under s. NR 216.455(2), Wis. Adm. Code, landowners of construction sites with storm water discharges
regulated by the Wisconsin Department of Natural Resources (WDNR) Storm Water Permit Program are
required to post this certificate in a conspicuous place at the construction site. This certifies that the site
has been granted WDNR storm water permit coverage. The landowner must implement and maintain erosion
control practices to limit sediment-contaminated runoff to waters of the state in accordance with the permit.
EROSION CONTROL COMPLAINTS
should be reported to the WDNR Tip Line at
1-800-TIP-WDNR (1-800-847-9367)
Please provide the following information to the Tip Line:
WDNR Site No. (FIN): 105558
Site Name: River Wood West Subdivision
Address/Location: River Wood West Subdivision City of STEVENS POINT
Additional Information:
Landowner: The Elizabeth Trust
Landowner's Contact Person: William Pritchard
Contact Telephone Number: (715) 570-7211
Permit Start Date: July 09, 2026
WDNR Publication # WT-813 (10/11)
CERTIFICATE OF PERMIT COVERAGE
By: ________________________________
Page 63 of 116
July 9, 2026
Via email GP-NE-2026-69-T01751
Permit No. 8023090
City of Stevens Point
Scott Beduhn
1515 Strongs Avenue
Stevens Point, WI 54481
RE: Coverage under WDNR-GP2-2022 to build new roadway infrastructure for the River
Wood West Subdivision in the City of Stevens Point, Portage County.
Dear Mr. Beduhn,
Thank you for submitting an application on behalf of the City of Stevens Point for coverage
under the wetland and waterway statewide general permit for municipalities. In compliance
with the provision(s) of Wis. Stats. ss. Chapter 281.36 (3g) (a)10 and Section 30.123(7),
municipalities are authorized to construct, reconstruct, or maintain highways, bridges, arches,
and culverts and will comply with the terms and conditions of WDNR-GP2-2022. Further
information regarding resource concerns and permitting can be found by following the
hyperlinks throughout the electronic version of this document.
According to your application, the City of Stevens Point is proposing a subdivision
development that will impact approximately 9,110 square feet of wetland.
You have certified that your project meets the eligibility criteria and conditions for this activity.
Based upon your signed certification you may proceed with your project. Please take this time
to re-read the permit eligibility standards and conditions. The eligibility standards can be found
on your application checklist or in the statewide general permit NR 320 (found at
http://dnr.wi.gov/topic/Sectors/Transportation.html, under the Permits tab). The permit
conditions are attached to this letter. You are responsible for meeting all general permit
eligibility standards and permit conditions. This includes notifying the department before
starting the project and submitting photographs within one week of the project’s
completion. Please note, your coverage is valid for five years from the date of the
department’s determination or until the activity is completed, whichever occurs first. This permit
coverage also constitutes the state of Wisconsin’s wetland water quality certification under
USCS s. 1341 (Clean Water Act s. 401).
The Natural Heritage Inventory Public Portal database was reviewed on June 4, 2026, for
potential impacts to threatened, endangered, or special concern resources. Details of this
review are contained in the Endangered Resource Review (ERR) Letter that was sent as a
separate attachment to this letter. The ERR letter is a confidential document that is not subject
to open records requests and may only be shared with people directly involved with the design
and construction of the project.
wisconsin.gov Printed on
Recycled
Paper
dnr.wi.gov
Tony Evers, Governor
Karen Hyun, Secretary
Telephone 608-266-2621
Toll Free 1-888-936-7463
TTY Access via relay - 711
State of Wisconsin
DEPARTMENT OF NATURAL RESOURCES
Northeast Region Headquarters
2984 Shawano Avenue
Green Bay, WI 54313-6727
Page 64 of 116
Mr. Beduhn
River Wood West Subdivision
General Permit Cover Letter
July 9, 2026
Page 2 of 3
Further action is required on your part regarding threatened, endangered, or special concern,
resources. Please keep me updated as you work through the required measures described in
the ERR letter.
A review for archeological and historical resources was also completed on June 7, 2026. The
project received clearance from the department’s archeologist on June 8, 2026. No further
action is required on your part regarding archeological or historical resources.
The department conducts routine and annual compliance monitoring inspections. Our staff
may follow up and inspect your project to verify compliance with state statutes and codes.
The department appreciates your willingness to comply with wetland regulations, which help to
protect the water quality, fish and wildlife habitat, natural scenic beauty, and recreational value
of Wisconsin’s wetland resources for future generations. Please be sure to obtain any other
local, state, or federal permits that are required before starting your project.
Additionally, please share this letter and the Municipal General Permit with the
construction foreman. This will help ensure that the crew completing the project are
aware of the permit requirements and recommendations provided in this letter.
If you need to modify your scope, have any questions regarding the review of the project, the
contents of this letter, or the permit requirements, please contact me at (920) 360-3784 or by
email at Jeremiah.Schiefelbein@Wisconsin.gov.
Sincerely,
Jay Schiefelbein
Environmental Analysis & Review Specialist
Enclosure: WDNR GP2-2022
BMPs for water quality
Image 1. Overview of Project Location
ec: J. Nieling – Stevens Point South
E. McGowan – Eau Claire
J. Kivela – City of Stevens Point
D. Katterhenry – Gremmer
File
Page 65 of 116
Image 1. Overview of Project Location
Page 66 of 116
Endangered Resources Review for the Proposed RiverWood West Subdivision, Portage County
WI DNR Reviewer Information
Review Date 6/4/2026
Reviewer Name Jeremiah Schiefelbein
Program Name Environmental Analysis & Sustainability
Work Station Brown
Section A. Location and brief description of the proposed project
Project Number GP 2026 T01751
Project Timing
Location Portage County - T24N R08E S31
Project Description
The Elizabeth Trust is proposing a subdivision development in the City of StevensPoint, Portage County. The project has two entrances one off West Zinda Drive andanother off West River Drive. The typical section for each roadway is 11 foot asphalttravel lanes and 2 foot gravel shoulders. 4 inches of asphalt over 12 inches of baseaggregate dense material. The roadways will be classified as local with average dailytraffic (ADT) of less than 100 vehicles per day. The project will be developed into 19 lotswith one of the lots being dedicated to the City of Stevens Point for the Green CircleTrail.
Current Habitat
Impacts to Wetlands or WaterbodiesMinimized to the greatest extent practicable.
Property Type
Federal Nexus Unknown
Details related to project location, design, and timing of disturbance are important for determining both the endangered resourcesthat may be impacted by the project and any necessary follow-up actions. Please renew the review when the project plans or timingchange, new details become available, or more than a year has passed to confirm if results of this ER Review are still valid.
The project follow-up actions are summarized below:
Required Actions: 1 speciesRecommended Actions: 2 speciesNo follow-up Actions: 5 speciesAdditional Recommendations: No
Section B. Endangered Resources recorded from within the project area and surrounding area
6/4/26, 3:29 PM
1/5
Page 67 of 116
Group State status Federal status
Red-shouldered Hawk (Buteo lineatus) Bird~ THR
Prairie Skink (Plestiodon septentrionalis) Lizard SC/H
Northern Flying Squirrel (Glaucomys sabrinus) Mammal SC/P
Prairie Vole (Microtus ochrogaster) Mammal SC/N
Karner Blue Butterfly High Potential Range Other NA HPR
Four-toed Salamander (Hemidactylium scutatum) Salamander~ SC/H
Wood Turtle (Glyptemys insculpta) Turtle~ THR
Blanding's Turtle (Emydoidea blandingii) Turtle~ SC/P
For additional information on the rare species, high-quality natural communities, and other endangered resources listed above,please visit our Biodiversity (https://dnr.wi.gov/topic/EndangeredResources/biodiversity.html) page. For further definitions of stateand federal statuses (END=Endangered, THR=Threatened, SC=Special Concern), please refer to the Natural Heritage Inventory(NHI) Working List (https://dnr.wi.gov/topic/NHI/calypso/EOReport.html#SStatus).
Section C. Follow-up Actions
Actions that need to be taken to comply with state and/or federal endangered species laws:
Red-shouldered Hawk (Buteo lineatus) - Bird~ State status: THR Federal status:
Impact type Impact possible
Required measures Time of year restriction,Surveys,Habitat Assessment
Description of required measures
Red-shouldered Hawk (Buteo lineatus), listed as Threatened in Wisconsin, prefers largerstands of older-aged to mature bottomland hardwoods along riparian areas, deciduousswamps, and northern hardwoods or mixed deciduous-coniferous upland forests withwetland pockets or ephemeral ponds interspersed or located in proximity.
Suitable habitat for the red-shouldered Hawk may be present within or immediatelyadjacent to the project area. The birds and their nests and eggs are also protected underthe federal Migratory Bird Treaty Act (MBTA). To avoid impacts to this listed species, theproject shall follow one of the two options below:
(i) Assume the birds are present on the site, and avoid all disturbances to the project sitefrom April 1 to July 31 (both dates inclusive). If the project cannot completely avoid allareas of suitable habitat during this time frame, please contact me to discuss otheroptions.
(ii) Not assume the birds are present on the site and have a qualified biologist conductsurveys to determine if they are present (see list of pre-qualified surveyors,https://wiatri.net/er/nhitraining/docs/BirdSurveyors.pdf).If the is not found on the site as a result of the surveys, there will be no projectrestrictions related to these species.
If surveys show the species is recorded, option (i) must be followed above. Surveyresults should be submitted to the Endangered Resources Review Program.
Actions recommended to help conserve Wisconsin’s Endangered Resources:
6/4/26, 3:29 PM
2/5
Page 68 of 116
Northern Flying Squirrel (Glaucomys sabrinus) - Mammal State status: SC/PFederal status:
Impact type Impact possible
Recommended measures Other
Description of recommended measures
Northern Flying Squirrel (Glaucomys sabrinus) is a Special Concern species inWisconsin and a Protected Wild Animal under NR 10.02 Wis. Admin. Stats. It inhabits anumber of forested natural communities and the presence of conifers and a relativelymoist environment are important habitat components. Although it does not require old-growth, it is generally associated with certain characteristics of older forests, such asstanding dead trees, an abundance of decaying coarse woody debris, a diverseunderstory, and high truffle abundances.
While this special concern species has no mandatory legal protections, I stronglyencourage you to follow the avoicance measures available at:https://widnr.widen.net/view/pdf/nib3le0cr3/ER0678.pdf?t.download=true&u=kkadwx
Blanding's Turtle (Emydoidea blandingii) - Turtle~ State status: SC/PFederal status:
Impact type Impact possible
Recommended measures Exclusion Fencing,Other
Description of recommended measures
Blanding's Turtle (Emydoidea blandingii) is a Special Concern species in Wisconsin,utilizes a wide variety of aquatic habitats including deep and shallow marshes, shallowbays of lakes and impoundments where areas of dense emergent and submergentvegetation exists, sluggish streams, oxbows and other backwaters of rivers, drainageditches (usually where wetlands have been drained), sedge meadows, and wetmeadows adjacent to these habitats. This species is semi-terrestrial, and individualsmay spend quite a bit of time on land. They often move between a variety of wetlandhabitats during the active season, which can extend from early-March to mid-November.They overwinter in standing water that is typically over 3 feet deep with a deep organicsubstrate but will also use both warm and cold-water streams and rivers where they canavoid freezing. Blanding's turtles generally breed in spring, late summer, or fall. Nestingoccurs from mid-May through early-July depending on spring temperatures. Theystrongly prefer to nest in sandy soils and may travel up to 300m from a wetland orwaterbody to find suitable nesting sites. This species appears to display nest site fidelity,returning to its natal site and nesting in a similar location annually. Young hatch fromearly-August through mid-October and take 17-20 years or more to reach maturity. Seethe species guidance document for avoidance measures and management guidancefrom the Natural Heritage Conservation Program.
Awareness of potential presence and having contractors remove and relocate any turtlesfound in the active work zone will help minimize impacts to this species. The active workzone includes any parking, staging, stockpiling, and storage locations.
Remember that although these actions are not required by state or federal endangered species laws, they may be required by otherlaws, permits, granting programs, or policies of this or another agency. Examples include the federal Migratory Bird Treaty Act, Baldand Golden Eagle Protection Act, State Natural Areas law, DNR Chapter 30 Wetland and Waterway permits, DNR Stormwaterpermits, and Forest Certification.
No actions are required or recommended for the following endangered resources:
6/4/26, 3:29 PM
3/5
Page 69 of 116
Prairie Skink (Plestiodon septentrionalis) - Lizard State status: SC/HFederal status:
Impact type No impact
Reason Other - Justification Required
Justification
Prairie Skink (Plestiodon septentrionalis), a Special Concern species in Wisconsin,prefers sandy soils in bracken grasslands or pine barrens. They are also found on opensandy banks along rivers and streams. Their range in Wisconsin is restricted to a smallnumber of counties in the northwestern portion of the state, but they are more commonlyfound west of Wisconsin in the Great Plains. They are active from May throughSeptember, breeding takes place soon after emerging from their communaloverwintering sites. During the breeding season, males exhibit bright orange chins, lips,and throats. Prairie skinks maintain burrow systems enabling them to escape frompredators that include hawks, owls, ground squirrels, raccoons, and snakes. In the fall,with the onset of cold temperatures, prairie skinks will lengthen their burrows andoverwinter there. A prairie skink's diet is made up of numerous terrestrial insects such asspiders, crickets, beetles, and grasshoppers.
Preferred habitat will not be impacted.
Prairie Vole (Microtus ochrogaster) - Mammal State status: SC/NFederal status:
Impact type No impact
Reason Lack of Suitable Habitat within Project Boundary
Justification
Prairie Vole (Microtus ochrogaster), a state Special Concern species, is found in drysand prairies, along fence lines, in open fields, sandy grassland terraces of large rivers,bluff prairies, abandoned farm fields, and seldom in barrens areas. Its preferred habitatseems to be native prairie sod, of which there is little left in Wisconsin. It avoids marshesand wet places. Semi-colonial, this species breeds throughout the year with a peak inJuly, August, and September.
Preferred habitat will not be impacted.
Karner Blue Butterfly High Potential Range - OtherState status: NAFederal status: HPR
Impact type No impact
Reason Other - Justification Required
Justification Given the heavily wooded habitat, it is highly unlikely that Lupine would be found on thisparcel.
Four-toed Salamander (Hemidactylium scutatum) - Salamander~ State status: SC/HFederal status:
Impact type No impact
Reason Lack of Suitable Habitat within Project Boundary
Justification
Four-toed Salamander (Hemidactylium scutatum), a Special Concern species, prefershardwood forests with ephemeral ponds, alder thickets, and sedge meadows, and to alesser degree, conifer swamps. It overwinters from November through late-March byburrowing underground to avoid freezing. Mating can occur in fall or spring at breedingponds, seepage pools, or springs. In April, females move to microhabitats of densemosses, usually sphagnum, overhanging the water's edge or dense mosses on downedwoody debris overlying the water. Four-toed salamanders will also nest in inundatedsedge tussock wetlands when mosses are not present. This species' unique nestingmicrohabitats appear to limit their abundance. Females remain with their eggs until theyhatch in late-May or June. Larvae drop into the water where they live until transformingin about six weeks. Four-toed salamanders remain active through November.
Preferred habitat will not be impacted.
6/4/26, 3:29 PM
4/5
Page 70 of 116
Wood Turtle (Glyptemys insculpta) - Turtle~ State status: THR Federal status:
Impact type No impact
Reason Other - Justification Required
Justification
Wood Turtle (Glyptemys insculpta), a Threatened Species in Wisconsin, prefers riversand streams with adjacent riparian wetlands and upland deciduous forests. This speciesoften forages in open wet meadows or in shrub-carrs dominated by speckled alder. Theyoverwinter in streams and rivers in deep holes or undercut banks where there is enoughwater flow to prevent freezing. This semi-terrestrial species typically remains within300m of rivers and streams. Wood turtles become active in spring as soon as the ice isgone and air temperatures reach around 50 deg. F, which can occur as early as mid-March. They may remain active into late-October but have been observed active andbreeding under the ice. Although they can breed at any time of year, breeding usuallyoccurs in the spring or fall. Nesting usually begins in late-May in southern Wisconsin andearly-June in the north and continues throughout June. They nest in open or semi-opencanopy areas containing gravelly or sandy soils, typically within 61m of open water.Young hatch in 55-75 days (mid-July to mid-September) depending on air temperatures.This species does not overwinter in nests, unlike some Wisconsin turtle species. Seethe species guidance document for avoidance measures and management guidancefrom the Natural Heritage Conservation Program.
The closest documented occurrence is greater than one mile from the project.
Awareness of potential presence and having contractors remove and relocate any turtlesfound in the active work zone will help minimize impacts to this species. The active workzone includes any parking, staging, stockpiling, and storage locations.
Disclaimer
This ER Review may contain Natural Heritage Inventory data (https://dnr.wi.gov/topic/NHI), including specific locations ofendangered resources, which are considered sensitive and are not subject to Wisconsin’s Open Records Law. As a result,information contained in this ER Review may be shared only with individuals or agencies that require this information in order tocarry out specific roles in the permitting, planning and implementation of the proposed project. Specific locations of endangeredresources may not be released or reproduced in any publicly disseminated documents. Details related to project location, design,and timing of disturbance are important for determining both the endangered resources that may be impacted by the project andany necessary follow-up actions. If the project plans change, new details become available, or more than a year passed, pleaserenew this review.
6/4/26, 3:29 PM
5/5
Page 71 of 116
From: Dexter Kaetterhenry
To: jared.seidl@wisconsin.gov
Cc: Bill Pritchard; Jarod Kivela; Adam Kuhn
Subject: RE: Riverwood West subdivision (City of Stevens Point)
Date: Friday, July 10, 2026 8:47:21 AM
Attachments: image001.gif
image002.gif
image003.gif
image004.gif
image005.gif
image006.gif
image007.png
image008.png
GP 2026 T01751 Riverwood West Subdivision GP Cover Letter.pdf
Good Morning Mr. Seidl,
Jay Schiefelbein and Ethan McGowen served as the reviewers for the upcoming
Riverwood West Subdivision project and have issued the attached Wetland General
Permit based on the current development plans. The links provided below include the
wetland delineation report as well as the project plans.
As part of the design process, we completed a full-build analysis of the subdivision,
which identified 9,110 square feet of wetland impacts. To minimize these impacts to the
greatest extent practicable while maintaining a viable development with access from
both West Zinda Drive and West River Drive, we incorporated front and side yard berms,
steeper grading slopes, and adjusted roadway alignments to reduce wetland
encroachment while preserving the functionality of the subdivision.
Please let me know if you have any questions or need any additional information.
Wetland Delineation Report
https://www.dropbox.com/scl/fi/wg1nl89eonazzm7dci25c/Pritchard_WetlandReport.pd
f?rlkey=bi7plhn6cih1n41wa0vdgy6kf&st=95banf7g&dl=0
Plans
https://www.dropbox.com/scl/fi/3doxrb9vmdoi8h6iqhijs/PRITCHARD_RiverWoodWestS
ubdivision_pln.pdf?rlkey=o7sfalcsl94lfo7m9mya6itre&st=vnfxoa44&dl=0
Thanks!
Dexter
Dexter D. Kaetterhenry, PE
Project Engineer
E: d.kaetterhenry@gremmerassociates.com
Page 72 of 116
Page 1 of 11
Administrative Staff Report
Department of Community
Development
Conceptual Plan Review
Conditional Use Permit
Site Plan Review
1016 Third Street
September 8, 2026
Applicant(s):
• Jim Lucas, representing R&L
Developers
Staff:
• Adam Kuhn, Associate Planner
akuhn@stevenspoint.com
Parcel Number(s):
• 281240832200425
Zone(s):
• “B-2” Central Business Transition
District
• “PD” Planned Development
Master Plan:
• Downtown District
Council District:
• District 1 | Ald. Christianson
Lot Information:
• Lot Size: 16,059 sq. ft. (0.369 ac.)
Current Use:
• Undeveloped
Applicable Regulations:
• 23.02(1)(f)(3)(b)
• 23.02(4)(b)
Request
1. Public Hearing and action on a request from Jim Lucas,
representing R&L Developers, for a conceptual plan review of a
proposed multi-family residential development on the property
located at 1016 Third Street (Parcel ID 281240832200425),
consistent with Ch. 23.02(4)(b)(5).
2. Public Hearing and action on a request from Jim Lucas,
representing R&L Developers, for a conditional use permit to
construct a multi-family residential building on the property located
at 1016 Third Street (Parcel ID 281240832200425), consistent with
Ch. 23.02(1)(f)(3)(b).
3. A request from Jim Lucas, representing R&L Developers, for a site
plan review to construct a multi-family residential building on the
property located at 1016 Third Street (Parcel ID
281240832200425), consistent with Ch. 23.02(4)(b)(1)(2).
Attachment(s)
1. Application
2. Plans
Findings of Fact
1. The applicant is requesting to construct a six-unit condominium on
the subject property.
2. The proposed structure would be situated on the northern half of
the property, with seven on-site parking stalls being situated
immediately to the south.
3. The property is zoned “B-2” Central Business Transition District. As
part of the redevelopment plan for the former Belke Lumber site,
the subject property was applied a “PD” Planned Development
overlay designation.
4. The “PD” Planned Development designation allows for modified
development standards, contingent on approval of a conceptual plan
and site plan review.
5. A conditional use permit is also required as 3+ residential units are
being proposed.
6. The Plan Commission and Common Council may attach additional
conditions onto this request as necessary.
Page 73 of 116
Page 2 of 11
Staff Recommendation
Approve the request for a conceptual plan review of a proposed multi-family
residential development on the property located at 1016 Third Street (Parcel
ID 281240832200425).
Approve the request for a conditional use permit to construct a multi-family
residential building on the property located at 1016 Third Street (Parcel ID
281240832200425), subject to the following conditions:
1. A building permit shall be obtained prior to the start of construction.
2. Staff shall be permitted to approve minor changes to the plan
submittal.
Approve the request for a site plan review to construct a multi-family
residential building on the property located at 1016 Third Street (Parcel ID
281240832200425), subject to the following conditions:
1. Garbage and recycling collection shall be handled commercially.
2. The intended trash enclosure shall be screened from public view,
subject to the review and approval of the Zoning Administrator.
3. Final details on proposed landscaping shall be submitted to the
Zoning Administrator for review and approval.
4. A building and erosion control permit shall be obtained prior to the
start of construction.
5. Staff shall have the ability to approve minor amendments to the
submitted plan set.
Vicinity Map
Page 74 of 116
Page 3 of 11
Background
Overview: The applicant is requesting to construct a six-unit condominium on the subject property, which would be
situated on the northern half of the property. Four of the units would have two bedrooms, while the remaining two
units would have one bedroom. Additional site features include seven parking stalls on the southern end of the property
and stormwater management features on both sides of the proposed structure. The property is zoned “B-2” Central
Business Transition District. As part of the redevelopment plan for the former Belke Lumber site, the subject property
was applied a “PD” Planned Development overlay designation. While the “PD” designation is applied to the property,
the Common Council must approve a conceptual development plan for the site and a site plan review. Additionally, land
use standards are subject to the base zoning of the property – in this case, the “B-2” District. A six-unit residence is a
conditional use within the “B-2” District and requires a conditional use permit to authorize said land use.
Standards of Review – Conceptual Plan Review
1. The proposed PD is consistent with the pertinent elements of the City of Stevens Point Comprehensive Plan
and any other adopted plans.
Analysis: The subject property has a future land use designation of ‘Downtown District,’ which “allows for and
promotes high density office, retail, housing and public uses, preferably in mixed-use buildings.”
Findings: Staff believes that this standard is met. The proposed land use is consistent with providing residential
uses on the periphery of the City’s Downtown. While the proposed structure will not be a mixed-use building, a
significant number of commercial and mixed-use buildings are located nearby.
Page 75 of 116
Page 4 of 11
2. The proposed PD is consistent with the standards and uses of the context area within which it is located.
Analysis: Multi-family residential uses exist to the east and west of the subject property. Single-family uses exist
to the north, while commercial and institutional uses exist to the south. Surrounding land uses are consistent
with the types of land uses allowed within the Downtown District.
Findings: This standard is met.
3. The proposed PD meets the requirements of this zoning ordinance.
Analysis: The proposed development meets all Zoning Code requirements. No deviations are being requested.
Findings: This standard is met.
4. The proposed PD will reinforce the existing or planned character of the neighborhood.
Analysis: Staff believes that the proposed development will support the existing neighborhood. High-density
multi-family residential developments exist to the east and west, and single-family development exists to the
north. The proposed six-unit structure provides a better land use transition from the stark differences in
residential intensity that currently exists. Various commercial uses exist to the south that will benefit from
having additional residential units close by.
Findings: While there are single-family uses that exist nearby, careful planning in site design took place to
minimize any concerns. For example, the height of the structure is designed in a way to be more complementary
to neighboring two-story single-family uses to the north.
5. The site is appropriate for the development allowed in the proposed PD.
Analysis: The subject property is appropriate for the proposed planned development. As mentioned earlier, the
subject property already has a “PD” overlay designation, as do neighboring lots as part of the former Belke
Lumber site.
Findings: This standard is met.
6. The PD demonstrates a higher quality of site design that is more sensitive to the existing context, both built
and natural, than is possible under other available zoning districts.
Analysis: The subject property is located within the City’s Downtown Design Review – a historic district that has
unique architectural and site design standards to promote harmonious development for a historically significant
area of the City. The City’s Historic Preservation / Design Review Commission has approved the proposed
building and site design during their August 25th, 2026 meeting.
Findings: The proposed three-story structure contains a variety of siding materials – metal, glass, concrete block
and composite wood siding – that provides contrast and is complementary with the historic land uses that
Page 76 of 116
Page 5 of 11
occupied the site. Building mass is significant in that it covers a considerable portion of the property, leaving
remaining land designated for parking and stormwater management.
7. Public facilities and services including but not limited to schools, roads, recreation facilities, wastewater
treatment, water supply and stormwater facilities are adequate for the development allowed in the proposed
PD.
Analysis: City infrastructure, such as roads and underground utility infrastructure, currently exists and can
support the proposed development. Stormwater features are proposed on the site to handle on-site retention.
Nearby recreational amenities exist, such as Pfiffner Park, that residents of the proposed building can utilize.
While the enrollment of the School District could increase with the proposed development, a total of six units is
not anticipated to result in a significant influx of school-aged residents.
Findings: This standard is met.
8. The PD will not substantially or permanently injure the appropriate use of adjacent conforming properties.
Analysis: Please see the section above regarding the future land use designation for the subject property.
Findings: Staff believes that this standard is met. The proposed multi-family residential development aligns with
the Comprehensive Plan’s intention to have high-density residential offerings within the City’s Downtown.
Standards of Review – Conditional Use Permit
1. The establishment, maintenance, or operation of the use will not be detrimental to, or endanger the public
health, safety, morals, comfort, or general welfare.
Analysis: Six residential units are proposed.
Findings: The City’s Zoning Code places numerous regulations designed as safeguards to protect the public.
These regulations include building setbacks, parking, stormwater management, etc. The proposed development
meets all Zoning Code requirements. By meeting Zoning Code requirements, staff believes that the proposal will
not endanger the health, safety and general welfare of the public.
2. The use will not be injurious to the use and for the purpose already permitted, nor substantially diminish and
impair property values.
Analysis: Six residential units are proposed.
Page 77 of 116
Page 6 of 11
Findings: Multi-family residential uses are identified as a conditional use within the “B-2” Central Business
Transition District. Based on the application and plan submittal, staff believe that the use will not be injurious to
the property or surrounding neighborhood.
3. The establishment of the use will not impede the normal and orderly development and improvement of the
surrounding property for uses permitted in the district.
Analysis: The respective area is in an established and developed area of the city.
Findings: See standards one and two above.
4. The exterior architectural appeal and function plan of any proposed structure will not be variance with either
the exterior architectural appeal and function plan, and scale of the structures already constructed or in the
course of construction in the immediate neighborhood or in the character of the applicable district so as to
result in a substantial or undue adverse effect on the neighborhood.
Analysis: The proposed buildings are planned to use a variety of siding material – metal, glass, concrete block
and composite wood siding – to provide contrast and a sound visual aesthetic. As mentioned earlier, the
property falls within the City’s Downtown Design Review District. The City’s Historic Preservation / Design
Review District approved a design review of the proposed structure and site improvements.
Findings: This standard is met.
5. Adequate utilities, access roads, drainage and/or facilities have been, or are being, provided.
Analysis: Seven parking spaces are proposed. While the subject property is exempt from minimum parking
requirements due to its “B-2” zoning designation, the City’s parking requirements would otherwise require nine
parking spaces. On-street parking is provided along Portage Street that can satisfy additional parking needs.
Access to the property is off of an existing private alley. On-site drainage is provided on the site and meets
minimum specifications.
Findings: This standard is met.
6. Adequate measures have been, or will be taken, to provide ingress and egress so designed to minimize traffic
congestion in the public streets.
Analysis: One access point is proposed off of the alley to the south. Given that six housing units are proposed,
staff believes that the one access point is adequate to handle traffic generation. The proposed driveway is 40’
away from the intersection between the alley and Third Street.
Findings: Staff believes that safe access into and out of the subject property is provided with the proposed land
use.
7. The proposed use is not contrary to the objectives of any duly adopted land use plan for the City of Stevens
Point and any of its components.
Page 78 of 116
Page 7 of 11
Analysis: The subject
property is zoned “B-2”
Central Business
Transition and already
has a “PD” Planned
Development Overlay
District designation. A
future land use
designation of
‘Downtown District’
exists. The “B-2” District
is estbalished to “be
applied on the fringe of the City's Central Business District for the following purposes: a) To accommodate
existing, new and relocated land uses which are compatible with the retail core area. b) To provide a commercial
district of intermediate intensity which will provide a buffer zone between the retail core and residential
neighborhoods.”
Findings: Staff believes that the proposed residential use aligns with the zoning and future land use designation
of the subject property.
8. The use shall, in all other respects, conform to the applicable regulations of the district in which it is located,
except as such regulations may, in each instance, be modified pursuant to the recommendations of the Plan
Commission.
Analysis: The property and use meet minimum performance standards in the “B-2” District. Several Building
Code requirements exist with the proposed land use and would need to be met as a condition for receiving
temporary occupancy.
Findings: This standard is met.
9. The proposal will not result in result in an over-concentration of high-density living facilities in one area so as
to result in a substantial or undue adverse effect on the neighborhood, on the school system, and the social
and protective systems of the community.
Analysis: The proposed development is in an area that allows for higher-density residential land uses, per the
City’s Future Land Use Map. Staff believes that social and emergency services in the area can support the
anticipated population influx.
Findings: The proposal should not result in an over-concentration of high-density living facilities as the property
is located near a commercial corridor designated as an arterial street.
10. Principal: Applications for exclusive multifamily residential uses: The view from the street should maintain a
residential character. The view should be dominated by the building and not by garages, parking, mechanical
equipment, garbage containers, or other storage.
Subject Property
Page 79 of 116
Page 8 of 11
Analysis: Please see previous sections of this report.
Findings: The current building matches the surrounding multi-family residential area in terms of architectural
appeal and general function.
11. Principal: Access to the site shall be safe.
a) All developments shall front on a public right-of-way unless recommended by the Public Works
Director.
Analysis: Access is proposed to be off of Third Street.
Finding: This standard is met.
b) The driveway to the site shall be located so as not to be a danger to the street flow of traffic.
Analysis: The proposed access point maintains minimum spacing requirements as outlined in the City’s
Zoning Code.
Findings: This standard is met.
c) The driveway shall not be too close to neighboring intersections.
Analysis: The proposed driveway is 40’ away from the intersection between the alley and Third Street.
20’ of separation is required.
Findings: This standard is met.
d) Alignment of the driveway shall be coordinated with adjacent access points to avoid conflict or
confusion.
Analysis: One driveway is proposed off of the alley. No driveway exists on the opposite side of the alley.
Findings: This standard is met.
e) Only one driveway shall be allowed per site unless recommended by the Public Works Director. Two
family units may be allowed more than one driveway if those driveways are separated by not less
than 10 feet. Maximum driveway openings shall be 20 feet (each).
Analysis: Based on the amount of street frontage provided, the City’s Zoning Code permits a maximum
of two driveways.
Findings: No access points are proposed off of City streets. Instead, access would be off of the adjacent
alley.
Page 80 of 116
Page 9 of 11
f) The organization of traffic flow on-site and between the site and the street shall be organized in a
clear hierarchy of flow patterns. Internal and external areas where traffic flow changes directions or
creates intersections shall be organized at clear intersections and those intersections are spaced far
enough apart so as to not cause confusion or problems and to provide for adequate spacing for
waiting vehicles.
Analysis: The traffic flow on the site to the street is anticipated to flow smoothly. Traffic will enter and
exit off of the adjacent alley, which leads to Third Street and Portage Street.
Findings: This standard is met.
g) Intersections are visible and not visually screened.
Analysis: The intersections are not screened from view.
Findings: Vision obstructions should not be a concern.
h) Adequate drainage and snow storage is provided.
Analysis: Adequate drainage exists on the property, and snow storage is expected to be located towards
the south end of the property.
Findings: This standard is met.
i) Minimum size requirements are maintained for safe vehicle circulation.
Analysis: The lot provides for adequate traffic aisles, as required by the City’s Zoning Code.
Findings: This standard is met.
j) Parking areas shall be safe. They shall be adequately lit, sized to meet minimum standards, graded so
as to not be too steep, and paved with concrete, brick, or bituminous surfacing. The light source shall
not be visible from adjacent properties. Lighting shall be developed in such a way to minimize light
straying onto adjacent properties.
Analysis: Additional lighting is planned to be located on the exterior of the building to meet minimum
Building Code requirements. Light pollution is anticipated to be minimal.
Findings: This standard is met.
k) Driveways shall be located to minimize the impact to adjacent properties.
Analysis: Please see above. The driveway should not cause a negative impact on the adjacent
properties.
Page 81 of 116
Page 10 of 11
Findings: This standard is met.
12. There shall be adequate utilities to serve the site.
a. The Public Works Director, Police Chief and Fire Chief shall determine whether there is adequate
sanitary sewer, portable water, storm drainage, street capacity, emergency access, public protection
services, and other utilities to serve the proposed development. They shall review the plan to ensure
safety and access for safety vehicles.
Analysis: Please see above. The property has the needed utilities and access to support the proposed
land use.
Findings: This standard is met.
13. The privacy of the neighboring development and the proposed development shall be maintained as much as
practical. Guidelines:
a. Mechanical equipment including refuse storage shall be screened from neighboring properties.
Analysis: Refuse storage is planned to be located within the parking lot. As a condition of approval, the
applicant would need to provide additional details as to the screening material that would be used.
Findings: This standard is met.
b. Lighting shall be located to minimize intrusion onto neighboring properties.
Analysis: Outside of light coming from the building, no additional lighting that impacts the surrounding
area is proposed.
Findings: This standard is met.
c. Sources of noise shall be located in a manner that minimizes impact to neighboring properties.
Analysis: The use will be operating within the confines of the building and property.
Findings: The use should not create excessive noise.
14. Principal – Applications for exclusive multi-family residential uses. Landscaping shall be provided, or existing
landscape elements shall be preserved to maintain a sense of residential character, define boundaries, and to
enhance the sense of enclosure and privacy.
Analysis: Landscaping is planned to be located along the building.
Findings: This standard is met.
Page 82 of 116
Page 11 of 11
Based on the findings above, staff would recommend approval of the conditional use permit with the conditions
outlined on page one. Please keep in mind that State legislation has placed limitations on local jurisdictions regarding
the denial of conditional use permits. Conditional use permits shall be reviewed by a means to permit a use under
certain conditions applied to the use or property. For example, if a concern is raised regarding to a standard above, a
condition can be applied to the permit to address the concern and grant the permit.
Page 83 of 116
Page 84 of 116
Page 85 of 116
Page 86 of 116
Page 87 of 116
Page 88 of 116
Page 89 of 116
Page 90 of 116
BUILDING 1
13'-0"
15'-8 1/4" 17'-9"
49'-11"
P O R T A G E S T R E E T
T H I R D S T R E E TEXISTING
BUILDING
FENCE TO SEPARATE WALK-OUT PATIO AREAS
ALL DRAWINGS ARE TO THE SCALE SHOWN ON THE SHEETS. THEY ARE INTENDED TO BE PRINTED ON 24x36" SHEETS. IF THEY ARE
PRINTED ON A DIFFERENT SIZE SHEET THE SCALE NEEDS TO BE ADJUSTED ACCORDINGLY.
715-572-2698
inquiry_arccentral@outlook.com
ARC CENTRAL LLC
PROJECT NO.
DATE
REVISIONS
© Arc Central LLC 2025
ARCHITECTURE, CONSTRUCTIONMANAGEMENT, INTERIOR DESIGN
PROPOSED PLANS
FOR
COPYRIGHT © Arc Central LLC 2025 All Rights Reserved
PARCEL ID:
1016 Third Street, Stevens Point, Wisconsin 54481
THIRD STREET CONDOMINIUMS
New Multi-Family For
T100
25109
August 21, 2025
1016 Third Street, Stevens Point,
Wisconsin 54481
SITE PLAN & SHEET INDEXTHIRD STREET CONDOMINIUMS
281240832200421 & 281240832200425
1" = 20'-0"1 1SITE PLANSITE PLAN
N
40'0' 10' 20'
CODE DATA
SOIL BEARING CAPACITY
GROUND SNOW LOAD
ROOF DEAD LOAD
LATERAL LOAD (115 mph WIND)
UPLIFT AT CANOPY
FLOOR LIVE LOAD, RESIDENTIAL
HALLWAY LIVE LOAD, RESIDENTIAL
Design Loads 1607.1/1608.2
Residential R2 OCC, With Sprinkler - 250 FT,
STAIRS = .30" PER OCC:
DOORS = .20" PER OCC: 108" PROVIDED, 36/38 =0.95"
Sanitary Facilities, Table 2902.1
Required Exit Width - Table 1005
Exit Access Travel Distance 1017.2
TYPE 5 B,
7,591 SF Proposed New Building
Wisconsin Enrolled, 2021 International Building Code
Residential, R2
Actual Building Area
Occupant Capacity 1004.1.2
Occupancy Classification - 303.3
Governing Code
Type of Construction - TABLE 601
Residential R2, 5B Constr, Sprinkled, Allows 3 Stories
Allowable Height - TABLE 504.4
R OCCUPANCY, PER UNIT REQUIREMENTS:
1 TOILET
1 LAVATORY
1 BATH / SHOWER
1 KITCHEN SINK
1 LAUNDRY CONNECTION PER 20 UNITS
= 3,000 PSF PRESUMED
= 40 PSF
= 15 PSF
= 24 PSF
= 30 PSF
= 40 PSF
= 100 PSF
Residential, R2 - 7,591 sf Occupied Area
7,591 / 200 sf per Person = 38 Occupants
Allowable Area - TABLE 506.2
Residential R2, 5B Constr, Sprinkled, Allows 21,000 sf
*Fire Suppression System must be 13, cannot be 13R*
IBC 1607.1 (26)
SHEET INDEX
TITLE
T100 SITE PLAN & SHEET INDEX
ARCHITECTURE
A001 LIFE SAFETY PLANS & FIRE PARTITION DETAILS
A010 UNIT TYPES
A101 PROPOSED FIRST FLOOR PLAN
A102 PROPOSED SECOND & THIRD FLOOR PLAN
A103 KITCHEN PLAN & CABINET ELEVATIONS
A104 BATHROOM PLAN & ELEVATIONS
A201 EXTERIOR BUILDING ELEVATIONS
A301 BUILDING SECTIONS
A302 WALL DETAILS
A303 STAIR DETAILS
A600 WINDOW SCHEDULE AND DETAILS
A701 3D VIEWS
STRUCTURE
S100 FOUNDATION PLAN & DETAILS
S101 FLOOR FRAMING PLANS
S102 ROOF FRAMING PLAN AND DETAILS
ELECTRICAL
E101 1ST FLR POWER & LIGHTING PLAN
E102 2ND & 3RD FLR POWER & LIGHTING PLAN
GENERAL
G101 FRAMING CONNECTIONS SCHEDULE
G102 SYMBOLS AND LEGENDS
G103 ACCESSIBILITY DETAILS
G104 ACCESSIBLE PARKING AND SIDEWALK DETAILS
Prelim. Plan 7.14.25
Const. Docs Date
Approval Date
Revision 1 Date
Revision 2 Date
Residential OCC, With Sprinkler - 125 FT,
Common Path Travel Distance 1006.2.1
Prescriptive Method for Heat Loss
ENERGY EFFICIENCY DATA IS ON SHEET A201
SHEET NOTES:
1. FIRE SUPPRESSION AND ALARM SYSTEMS SHALL BE DESIGNED, SUBMITTED, AND INSTALLED
BY SYSTEM SUBCONTRACTOR PER NFPA 13 AND 2021 IBC.
2. HVAC SYSTEM SHALL BE DESIGNED, SUBMITTED AND INSTALLED BY SUBCONTRACTOR.
3. PLUMBING SYSTEM SHALL BE DESIGNED, SUBMITTED AND INSTALLED BY SUBCONTRACTOR.
4. TRUSS SHOP DRAWINGS SHALL BE SENT TO THE ARCHITECT FOR SUBMITTAL TO THE STATE.
Page 6 of 61
Page 91 of 116
DN
DryerWasher
DryerWasher
UP
DryerWasher
WasherDryer
WALL TYPE E SECTION
1 HR. FIRE RATED TO MEET CODE
STANDARDS: TABLE 602
1'-4"
WALL TYPE A SECTION
1 HR. FIRE & SOUND RATED
GA WP3370 STC 51
R-13 FIBERGLASS
BATT INSULATION
STC 51
1 LAYER 5/8"
TYPE X GYPSUM
WALL BOARD
RATED
ASSEMBLY UL
U419
1'-4"
R-13 FIBERGLASS
BATT INSULATION
1 LAYER 5/8"
TYPE X GYPSUM
WALL BOARD
RATED ASSEMBLY UL
U305, STC 51
2 LAYER 5/8" TYPE X
GYPSUM WALL BOARD
INDICATES 1 HR COORIDOR FIRE
BARRIER, 45-MIN DOOR MINIMUM
INDICATES 1 HR FIRE BARRIER @
STAIR SHAFTS, 1-HR DOOR MINIMUM
WALL TYPE F SECTION
1 HR. FIRE RATED TO MEET CODE
STANDARDS: TABLE 602
1'-4"
R-13 FIBERGLASS
BATT INSULATION
1 LAYER 5/8"
TYPE X GYPSUM
WALL BOARD
RATED ASSEMBLY UL
U305, STC 51
1/2" RESILENT
CHANNEL
1'-4"
WALL TYPE G SECTION
1 HR. FIRE RATED TO MEET CODE
STANDARDS: TABLE 602
5 1/2" THERMAFIBER
SAFB
1 LAYER 5/8" TYPE X
GYPSUM WALL BOARD
INTERIOR SIDE
RATED ASSEMBLY UL
U330
1" EXTRUDED
POLYSTYRENE
INSULATING SHEATING
EXTERIOR SIDING BY
OWNER
INDICATES 1 HR COORIDOR FIRE
BARRIER, 45-MIN DOOR MINIMUM
715-572-2698
inquiry_arccentral@outlook.com
ARC CENTRAL LLC
PROJECT NO.
DATE
REVISIONS
© Arc Central LLC 2025
ARCHITECTURE, CONSTRUCTIONMANAGEMENT, INTERIOR DESIGN
PROPOSED PLANS
FOR
COPYRIGHT © Arc Central LLC 2025 All Rights Reserved
ALL DRAWINGS ARE TO THE SCALE SHOWN ON THE SHEETS. THEY ARE INTENDED TO BE PRINTED ON 24x36" SHEETS. IF THEY ARE
PRINTED ON A DIFFERENT SIZE SHEET THE SCALE NEEDS TO BE ADJUSTED ACCORDINGLY. A001
25109
August 21, 2025
0 Third Street, Stevens Point,
Wisconsin 54481
LIFE SAFETY PLANS & FIRE
PARTITION DETAILSTHIRD STREET CONDOMINIUMS
1/8" = 1'-0"3 33RD FLR FIRE SEPARATION3RD FLR FIRE SEPARATION
1/8" = 1'-0"2 22ND FLR FIRE SEPARATION2ND FLR FIRE SEPARATION
1/8" = 1'-0"1 11ST FLR FIRE SEPARATION1ST FLR FIRE SEPARATION
16'0' 4' 8' 16'0' 4' 8' 16'0' 4' 8'
1" = 1'-0"4 4FIRE PARTITIONSFIRE PARTITIONS
0' 2'6" 1'
SHEET NOTES:
1. ALL UNITS TO INCLUDE A MINIMUM RATED 2-A:10-BC PORTABLE FIRE EXTINGUISHER IN EACH KITCHEN - IN
ACCORDANCE WITH IBC 906.3.1, NFC 906, AND NFPA 10
2. ALL UNITS TO INCLUDE A SMOKE ALARM IN EACH BEDROOM AND OUTSIDE OF EACH SEPARATE SLEEPING
AREA PER IBC 907.2.11.2.
3. ALL UNITS TO INCLUDE A CARBON MONOXIDE DETECTOR OUTSIDE OF EACH SLEEPING AREA AND IN BEDROOMS
WHERE THERE IS A FUEL BURNING APPLIANCE LOCATED WITHIN PER IBC IBC 915.2 AND SPS 362.0915
4. 1 SEMI-RECESSED FIRE EXTINGUISHER CABINETS (FEC) PER FLOOR NOT TO PROJECT OUT INTO CIRCULATION
PATH GREATER THAN 4 INCHES.
Prelim. Plan 7.14.25
Const. Docs Date
Approval Date
Revision 1 Date
Revision 2 Date
Page 7 of 61
Page 92 of 116
DN
UP
DryerWasher
DN
B
C
D
D
D
E F
B
A
EE
78 SF 78 SF
UNIT 1 LAUNDRY
ROOM
81 SF 81 SF
UNIT 1 ENTRY
68 SF 68 SF
UNIT 1 BATHROOM
99 SF 99 SF
UNIT 1 BEDROOM 1
134 SF 134 SF
UNIT 1 BEDROOM 2
115 SF 115 SF
UNIT 1 KITCHEN
179 SF 179 SF
UNIT 1 LIVING
ROOM
13 SF 13 SF
UNIT 1
MECHANICAL
CLOSET
11 SF 11 SF
UNIT 1 COAT
CLOSET
48 SF 48 SF
BALCONY
10 SF 10 SF
UNIT 1 BEDROOM 1
CLOSET
18 SF 18 SF
UNIT 1 BEDROOM 2
CLOSET
C
D
D
D
B
B
C
B
D
D
D
D
D
B
B
E
F
A
57 SF 57 SF
UNIT 2 ENTRY
46 SF 46 SF
UNIT 2 LAUNDRY
ROOM
16 SF 16 SF
UNIT 2
MECHANICAL
CLOSET
189 SF 189 SF
UNIT 2 KITCHEN
66 SF 66 SF
UNIT 2 BATHROOM
172 SF 172 SF
UNIT 2 LIVING
ROOM
131 SF 131 SF
UNIT 2 BEDROOM
16 SF 16 SF
UNIT 2 BEDROOM
CLOSET
198 SF 198 SF
BALCONY
E
B
C
1'-4"
WALL TYPE A PLAN
1 HR. FIRE & SOUND RATED
GA WP3370 STC 51
R-13 FIBERGLASS
BATT INSULATION
STC 51
1 LAYER 5/8"
TYPE X GYPSUM
WALL BOARD
2"x4" WOOD STUD
FRAMING, 16" O.C.
RATED
ASSEMBLY UL
U419
1'-4"
WALL TYPE B PLAN
STANDARD 2"x6" EXTERIOR WALL
R-13 FIBERGLASS
BATT INSULATION
1 LAYER 1/2"
GYPSUM WALL
BOARD
EXTERIOR SIDING
OVER 1/2" OSB
SHEATHING AS
SELECTED BY OWNER
2"x6" WOOD STUD
FRAMING, 16" O.C.
1'-4"
WALL TYPE C PLAN
STANDARD 2"x6" INTERIOR WALL
1 LAYER 1/2"
GYPSUM WALL
BOARD
2"x6" WOOD STUD
FRAMING, 16" O.C.
1'-4"
WALL TYPE D PLAN
STANDARD 2"x4" INTERIOR WALL
1 LAYER 1/2"
GYPSUM WALL
BOARD
2"x4" WOOD STUD
FRAMING, 16" O.C.
1'-4"
WALL TYPE E PLAN
1 HR. FIRE RATED TO MEET CODE
STANDARDS: TABLE 602
R-13 FIBERGLASS
BATT INSULATION
1 LAYER 5/8"
TYPE X GYPSUM
WALL BOARD
2"x6" WOOD STUD
FRAMING, 16" O.C.
RATED ASSEMBLY UL
U305, STC 51
1/2" RESILENT
CHANNEL
1'-4"
WALL TYPE F PLAN
1 HR. FIRE RATED TO MEET CODE
STANDARDS: TABLE 602
R-13 FIBERGLASS
BATT INSULATION
1 LAYER 5/8"
TYPE X GYPSUM
WALL BOARD
2"x6" WOOD STUD
FRAMING, 16" O.C.
RATED ASSEMBLY UL
U305
2 LAYER 5/8" TYPE X
GYPSUM WALL BOARD
1'-4"
WALL TYPE G SECTION
1 HR. FIRE RATED TO MEET CODE
STANDARDS: TABLE 602
5 1/2" THERMAFIBER
SAFB
1 LAYER 5/8" TYPE X
GYPSUM WALL BOARD
INTERIOR SIDE
RATED ASSEMBLY UL
U330
1" EXTRUDED
POLYSTYRENE
INSULATING SHEATING
EXTERIOR SIDING BY
OWNER
715-572-2698
inquiry_arccentral@outlook.com
ARC CENTRAL LLC
PROJECT NO.
DATE
REVISIONS
© Arc Central LLC 2025
ARCHITECTURE, CONSTRUCTIONMANAGEMENT, INTERIOR DESIGN
PROPOSED PLANS
FOR
COPYRIGHT © Arc Central LLC 2025 All Rights Reserved
ALL DRAWINGS ARE TO THE SCALE SHOWN ON THE SHEETS. THEY ARE INTENDED TO BE PRINTED ON 24x36" SHEETS. IF THEY ARE
PRINTED ON A DIFFERENT SIZE SHEET THE SCALE NEEDS TO BE ADJUSTED ACCORDINGLY. A010
25109
August 21, 2025
0 Third Street, Stevens Point,
Wisconsin 54481
UNIT TYPESTHIRD STREET CONDOMINIUMS
Prelim. Plan 7.14.25
Const. Docs Date
Approval Date
Revision 1 Date
Revision 2 Date
1/4" = 1'-0"1 1UNIT TYPE 1UNIT TYPE 1
0' 8'0' 2' 4'
1/4" = 1'-0"2 2UNIT TYPE 2UNIT TYPE 2
0' 8'0' 2' 4'
SHEET NOTES:
1. ALL FRAMING SHOULD BE SPF #2 OR BETTER
2. ALL FRAMING LUMBER IN CONTACT WITH GRADE OR MASONRY SHALL
BE PRESSURE TREATED
3. ALL HEADERS SHALL BE SUPPORTED BY MINIMUM OF TWO SHOULDER
STUDS. SPANS OVER 10 FEET SHALL HAVE 5 1/2" MINIMUM BEARING.
4. ALL DIMENSIONS ARE FROM FACE OF STUD TO FACE OF STUD UNLESS
OTHERWISE SPECIFIED
5. CORRIDOR WALLS TO BE STC 50 MIN.
1" = 1'-0"3 3WALL TYPESWALL TYPES
0' 2'6" 1'
1ST & 2ND FLOOR 3RD FLOOR
Page 8 of 61
Page 93 of 116
UP
Dryer Washer
Washer Dryer
12'-0"
13'-0"
12'-0"
25'-0"
13'-0" 6'-0"
22'-0"
26'-0"
25'-0"
27'-0"
1'-0"
13'-0"
14'-0"
6'-0"
14'-0"
13'-0"
1'-0"
5'-0"
5'-0"
4'-0"
3'-6 1/2"
4'-6 1/2"
A
A A
A A
A
G
H
G
G
G
G
B
B
B
D
D
B
B
D
I
I
B
DD
2'-0"
2'-1"
D
J
A103
1
A104
1
32'-0"
UNIT TYPE 1 UNIT TYPE 1
G
G
H
26'-0" 25'-0"
1
A301
2
A301
3
A301
J
E
6'-4 1/2"
11'-6 1/2" 12'-0 1/2" 12'-0 1/2" 12'-1" 6'-0" 12'-1" 11'-6 1/2"
24'-1"
24'-1"
24'-1"
29'-6 1/2"
24'-1"
31'-1"
31'-4 1/2" 17'-5" 5'-0" 7'-6 1/2" 3'-1"
4'-0"5'-8 1/2"
8'-6 1/2"2'-1"
5'-6" 4'-2 1/2"
10'-0"
10'-0"
8'-10" 3'-10"
22'-6 1/2"
12'-8"
8'-6 1/2"
8'-2"
13'-1"
12'-1"
9'-8 1/2" 2'-1"9'-0"3'-9 1/2" 5'-1" 4'-0 1/2" 6'-0"
2'-1" 9'-8 1/2"
12'-1"
9'-5"
6'-0"5'-0"9'-5"9'-8 1/2"
9'-0" 3'-9 1/2"
12'-1"
5'-1" 4'-0 1/2" 6'-0"
12'-1"
2'-1"9'-8 1/2"
3'-0" 7'-7 1/2" 5'-0"
6'-0"
8'-10"
22'-6 1/2"
12'-8"
B B
WALK-OUT PATIO WALK-OUT PATIO
EXTERIOR
OVERHEAD DOOR
FIN FLR
A
2
INTERIOR
MDF 2-PANEL
B
INTERIOR
MDF 2-PANEL
C
INTERIOR
MDF 2-PANEL
D
FIN FLR
INTERIOR
MDF 2-PANEL
E
INTERIOR
MDF 2-PANEL
F
EXTERIOR
STEEL ENTRY DOOR
G
EXTERIOR
STEEL PANEL
60 MIN FIRE RATING
SELF-CLOSING PER IBC 716.5.9
H
EXTERIOR
GLASS STOREFRONT
I
INTERIOR
MDF 2-PANEL
VENTED BOTTOM PANEL
J
1/4" = 1'-0"1 1FIRST FLOORFIRST FLOOR
715-572-2698
inquiry_arccentral@outlook.com
ARC CENTRAL LLC
PROJECT NO.
DATE
REVISIONS
© Arc Central LLC 2025
ARCHITECTURE, CONSTRUCTIONMANAGEMENT, INTERIOR DESIGN
PROPOSED PLANS
FOR
COPYRIGHT © Arc Central LLC 2025 All Rights Reserved
ALL DRAWINGS ARE TO THE SCALE SHOWN ON THE SHEETS. THEY ARE INTENDED TO BE PRINTED ON 24x36" SHEETS. IF THEY ARE
PRINTED ON A DIFFERENT SIZE SHEET THE SCALE NEEDS TO BE ADJUSTED ACCORDINGLY. A101
25109
August 21, 2025
0 Third Street, Stevens Point,
Wisconsin 54481
PROPOSED FIRST FLOOR
PLANTHIRD STREET CONDOMINIUMS
0' 8'0' 2' 4' N
DOOR SCHEDULE
TYPE
SIZE
COUNT
LH DOOR
SWING
RH DOOR
SWING COMMENTSWIDTH HEIGHT
FIRST FLOOR
A 10' - 0" 8' - 0" 6 OVERHEAD DOOR
B 3' - 0" 6' - 8" 8 4 4
D 4' - 0" 6' - 8" 6 DOUBLE BIFOLD
E 5' - 0" 6' - 8" 1 DOUBLE BIFOLD
G 3' - 0" 6' - 8" 7 4 3
H 3' - 0" 6' - 8" 2 1 1
I 3' - 0" 6' - 10" 2 1 1
J 2' - 8" 6' - 8" 2 1 1 VENTED HVAC CLOSET DOOR
SECOND FLOOR
B 3' - 0" 6' - 8" 12 6 6
D 4' - 0" 6' - 8" 6 DOUBLE BIFOLD
E 5' - 0" 6' - 8" 2 DOUBLE BIFOLD
H 3' - 0" 6' - 8" 1 1
J 2' - 8" 6' - 8" 2 1 1 VENTED HVAC CLOSET DOOR
THIRD FLOOR
B 3' - 0" 6' - 8" 6 3 3
C 2' - 8" 6' - 8" 2 1 1
F 6' - 0" 6' - 8" 2 DOUBLE BIFOLD
H 3' - 0" 6' - 8" 1 1
I 3' - 0" 6' - 10" 2 1 1
J 2' - 8" 6' - 8" 2 1 1 VENTED HVAC CLOSET DOOR
1/4" = 1'-0"
DOOR LEGENDDOOR LEGEND
Prelim. Plan 7.14.25
Const. Docs Date
Approval Date
Revision 1 Date
Revision 2 Date
Page 9 of 61
Page 94 of 116
UP
DryerWasher
DryerWasher
DNDN
5'-0"26'-5 1/2"13'-0"
10'-0" 32'-0" 10'-0"
13'-0"
14'-0"
6'-0"
26'-0"14'-0"
B B
H
B B
B
J
E
B
D
DD
BB
DD
D
B
E
J
B
UNIT TYPE 1 UNIT TYPE 1
5'-0"
1'-0"
1
A301
2
A301
A303
2
7'-6" 15'-2" 7'-6"
4'-6 1/2"
4'-6 1/2"
4'-6 1/2"
10'-5 1/2"
9'-1"
22'-6 1/2"
12'-8" 12'-8"
8'-10" 8'-10"
23'-11"
8'-2"
17'-5"
4'-6"
3'-0" 7'-7 1/2"
8'-6 1/2" 2'-1"
5'-7" 4'-1 1/2"
10'-0"
12'-1"
6'-0"9'-5"
12'-1"
4'-0 1/2"5'-1"
2'-1"9'-8 1/2"
2'-1" 9'-0"
9'-8 1/2"
13'-1"
12'-1"
3'-9 1/2"
3'-0"7'-11"
4'-6"5'-2 1/2"
8'-6 1/2"2'-1"
5'-7" 4'-1 1/2"
10'-5 1/2"
9'-1"
5'-0"5'-0"
22'-6 1/2"
23'-11"
1'-0" 5'-0"9'-5"2'-1"9'-8 1/2"
9'-0"
13'-1"
12'-1"
3'-9 1/2" 5'-1" 4'-0 1/2"
2'-1" 9'-8 1/2"
12'-1"
3'-10"
A104
4
B BA104
7
10'-0"
5'-0"
32'-0"
5'-0"
10'-0"
25'-5 1/2"16'-0"
16'-0"
8'-0"
B
H
B
C
J
B
BFF
B
B
C
J
A103
5
5'-6"
UNIT TYPE 2 UNIT TYPE 2
1
A301
2
A301
16'-0"
16'-0"
8'-0"
25'-5 1/2"
2'-0"
7'-6" 15'-2" 7'-6"
4'-6 1/2"
4'-6 1/2"8'-2"
17'-5"
4'-8 1/2"
3'-0" 2'-6" 6'-0"
22'-8"
12'-4 1/2" 4'-0"
7'-7"
2'-6 1/2"
3'-8"
6'-8"
8'-3 1/2"
9'-1"
6'-3"
6'-0"
11'-6 1/2"
2'-6 1/2"
2'-6 1/2"
11'-6 1/2"
6'-0" 2'-6 1/2"
3'-8" 7'-7" 9'-1"
6'-1"
12'-4 1/2"4'-0"
5'-6"
3'-0"2'-6"6'-0"
22'-8"
6'-8" 12'-3"
8'-3 1/2"
12'-8" 12'-8"
12'-1"
2'-1"9'-8 1/2"
8'-1"4'-3 1/2" 8'-1"
2'-1"9'-8 1/2"
4'-3 1/2"12'-1"
715-572-2698
inquiry_arccentral@outlook.com
ARC CENTRAL LLC
PROJECT NO.
DATE
REVISIONS
© Arc Central LLC 2025
ARCHITECTURE, CONSTRUCTIONMANAGEMENT, INTERIOR DESIGN
PROPOSED PLANS
FOR
COPYRIGHT © Arc Central LLC 2025 All Rights Reserved
ALL DRAWINGS ARE TO THE SCALE SHOWN ON THE SHEETS. THEY ARE INTENDED TO BE PRINTED ON 24x36" SHEETS. IF THEY ARE
PRINTED ON A DIFFERENT SIZE SHEET THE SCALE NEEDS TO BE ADJUSTED ACCORDINGLY. A102
25109
August 21, 2025
0 Third Street, Stevens Point,
Wisconsin 54481
PROPOSED SECOND &
THIRD FLOOR PLANTHIRD STREET CONDOMINIUMS
0' 8'0' 2' 4'
1/4" = 1'-0"1 1SECOND FLOORSECOND FLOOR
N
1/4" = 1'-0"2 2THIRD FLOORTHIRD FLOOR
0' 8'0' 2' 4' N
Prelim. Plan 7.14.25
Const. Docs Date
Approval Date
Revision 1 Date
Revision 2 Date
Page 10 of 61
Page 95 of 116
A103
2
3
4
STUD TO STUD
8'-5 1/2"
FACE OF STUD TO FACE OF STUD
8'-2 1/2"
4'-0"
4'-1 7/8"
REFRIGERATOR
3'-6"1'-6"3'-0"
3'-0"
3'-0"
A103
6
7
98
STUD TO STUD
7'-8 1/2"
8'-0 1/2"
3'-6"
5'-0"
REFRIGERATOR
3'-6"1'-6"3'-0"3'-0"
3'-0"
3'-0"2'-0"3'-0"
8'-0"
715-572-2698
inquiry_arccentral@outlook.com
ARC CENTRAL LLC
PROJECT NO.
DATE
REVISIONS
© Arc Central LLC 2025
ARCHITECTURE, CONSTRUCTIONMANAGEMENT, INTERIOR DESIGN
PROPOSED PLANS
FOR
COPYRIGHT © Arc Central LLC 2025 All Rights Reserved
ALL DRAWINGS ARE TO THE SCALE SHOWN ON THE SHEETS. THEY ARE INTENDED TO BE PRINTED ON 24x36" SHEETS. IF THEY ARE
PRINTED ON A DIFFERENT SIZE SHEET THE SCALE NEEDS TO BE ADJUSTED ACCORDINGLY. A103
25109
August 21, 2025
0 Third Street, Stevens Point,
Wisconsin 54481
KITCHEN PLAN & CABINET
ELEVATIONSTHIRD STREET CONDOMINIUMS
1/2" = 1'-0"1 1KITCHEN TYPE 1KITCHEN TYPE 1
1/2" = 1'-0"2 2KITCHEN TYPE 1 - ELEV. 1KITCHEN TYPE 1 - ELEV. 1
1/2" = 1'-0"3 3KITCHEN TYPE 1 - ELEV. 2KITCHEN TYPE 1 - ELEV. 2
1/2" = 1'-0"4 4KITCHEN TYPE 1 - ELEV. 3KITCHEN TYPE 1 - ELEV. 3
2' 4'0' 1'
2' 4'0' 1'
2' 4'0' 1'
2' 4'0' 1' 1/2" = 1'-0"5 5KITCHEN TYPE 2KITCHEN TYPE 2
2' 4'0' 1'
1/2" = 1'-0"6 6KITCHEN TYPE 2 - ELEV. 1KITCHEN TYPE 2 - ELEV. 1
1/2" = 1'-0"7 7KITCHEN TYPE 2 - ELEV. 2KITCHEN TYPE 2 - ELEV. 2
1/2" = 1'-0"8 8KITCHEN TYPE 2 - ELEV. 3KITCHEN TYPE 2 - ELEV. 3
1/2" = 1'-0"9 9KITCHEN TYPE 2 - ELEV. 4KITCHEN TYPE 2 - ELEV. 4
2' 4'0' 1'
2' 4'0' 1'
2' 4'0' 1'
2' 4'0' 1'
Prelim. Plan 7.14.25
Const. Docs Date
Approval Date
Revision 1 Date
Revision 2 Date
Page 11 of 61
Page 96 of 116
Washer Dryer
Washer
A104 3
PROVIDE BLOCKING FOR FUTURE
SWING UP GRAB BAR INSTALLATION
PER ICC/ANSI A 117.1 CHAPTER 1104.11.1
REMOVABLE VANITY CABINET,
FINISH FLOOR AND WALL BEHIND
2CL
1'-6" 1'-9 1/2"
CLCLCL 1'-3 3/4" 1'-3 3/4"
PROVIDE BLOCKING FOR FUTURE
GRAB BAR INSTALLATION
REMOVABLE SHOWER SEAT
WASHER AND DRYER TO COMPLY
WITH ANSI 117.1 SECTION 611
A104 10
AFF
8'-0"
A104 6
5
CL CL CL CL CL EQEQEQEQEQEQ
TILE SHOWER
WALLS & FLOOR
PROVIDE BLOCKING
FOR FUTURE GRAB
BAR INSTALLATION
WINDOW TYPE A
TILE SHOWER WALLS,
BENCH, AND FLOOR
PROVIDE BLOCKING
FOR FUTURE GRAB
BAR INSTALLATION
BUILT-IN BENCH:
- 17 INCHES MIN. TO 19 INCHES MAX. AFF
- MUST BE ABLE TO WITHSTAND 250+ LBS
A104
8
9
TUB BASE
WINDOW TYPE A
TILE WALLS
PROVIDE BLOCKING
FOR FUTURE GRAB
BAR INSTALLATION
CL CL CL CL CL EQEQEQEQEQEQTUB BASE
TILE WALLS
PROVIDE BLOCKING
FOR FUTURE GRAB
BAR INSTALLATION
715-572-2698
inquiry_arccentral@outlook.com
ARC CENTRAL LLC
PROJECT NO.
DATE
REVISIONS
© Arc Central LLC 2025
ARCHITECTURE, CONSTRUCTIONMANAGEMENT, INTERIOR DESIGN
PROPOSED PLANS
FOR
COPYRIGHT © Arc Central LLC 2025 All Rights Reserved
ALL DRAWINGS ARE TO THE SCALE SHOWN ON THE SHEETS. THEY ARE INTENDED TO BE PRINTED ON 24x36" SHEETS. IF THEY ARE
PRINTED ON A DIFFERENT SIZE SHEET THE SCALE NEEDS TO BE ADJUSTED ACCORDINGLY. A104
25109
August 21, 2025
0 Third Street, Stevens Point,
Wisconsin 54481
BATHROOM PLAN &
ELEVATIONSTHIRD STREET CONDOMINIUMS
Prelim. Plan 7.14.25
Const. Docs Date
Approval Date
Revision 1 Date
Revision 2 Date
1/2" = 1'-0"1 1ACCESSIBLE BATH & LAUNDRY PLANACCESSIBLE BATH & LAUNDRY PLAN
1/2" = 1'-0"3 3ADA BATHROOM ELEV. 2ADA BATHROOM ELEV. 2
2' 4'0' 1'
2' 4'0' 1'2' 4'0' 1'
REQUIRED SHEET NOTES:
ANSI/ICC 117.1 - 609.8 STRUCTURAL STRENGTH
- ALLOWABLE STRESSES SHALL NOT BE EXCEEDED FOR MATERIALS USED WHERE A VERTICAL
OR HORIZONTAL FORCE OF 250 POUNDS IS APPLIED AT ANY POINT ON THE GRAB BAR,
FASTENER MOUNTING DEVICE, OR SUPPORTING STRUCTURE.
- PROVIDE TOILET AND BATHING ROOM FLOORS WITH A SMOOTH, HARD, NONABSORBENT
SURFACE EXTENDING 4" MINIMUM UP THE WALLS WITHIN 2' OF URINAL AND TOILET.
- BATHROOM DOORS SHALL HAVE PRIVACY SET HARDWARE.
IBC 1101.2 & ANSI/ICC 117.1 - SECTION 604.2:
- THE CENTERLINE OF THE WATER CLOSET SHALL BE 16 INCHES MINIMUM AND 18 INCHES
MAXIMUM FROM THE SIDE WALL OR PARTITION.
IBC 1101.2 & ANSI/ICC 117.1 - SECTION 604.7:
- THE TOP OF THE TOILET PAPER DISPENSER SHALL BE 1-1/2" INCHES BELOW THE HORIZONTAL
SIDE WALL GRAB BAR TO BE WITHIN THE ACCEPTABLE REACH RANGE.
ANSI/ICC 117.1 - CHAPTER 6 - BATHING ROOMS
CONTROLS AND ENCLOSURESCONTROLS AND ENCLOSURES
- SHOWER CONTROLS AND FITTING MUST BE AT LEAST 1-1/2" ABOVE THE GRAB BAR SO THAT
THEY DO NOT IMPEDE THE BAR'S GRIPPING SURFACE.
- FLUSH CONTROLS SHALL BE LOCATED ON THE OPEN SIDE OF THE WATER CLOSET.
THRESHOLDSTHRESHOLDS
- A THRESHOLD HEIGHT UP TO 1/2" IS PERMITTED, TRENCH DRAINS AND OTHER DESIGNS THAT
ALL A FLUSH TRANSITION TO THE SHOWER FLOOR WILL PROVIDE EASIER ACCESS.
- SHOWER FLOORS CAN SLOP TO DRAINS (A 1:48 MAXIMUM SLOPE WILL HELP CONTROL WATER
WITHOUT IMPACTING ACCESSIBILITY).
SHOWER SPRAY UNITS AND WATER TEMPERATURE AT SHOWER COMPARTMENTSSHOWER SPRAY UNITS AND WATER TEMPERATURE AT SHOWER COMPARTMENTS
- A HAND-HELD SHOWER SPRAY UNIT THAT CAN ALSO BE USED IN A FIXED POSITION IS
REQUIRED AT ALL ACCESSIBLE SHOWERS AND BATHTUBS.
- THE WATER TEMPERATURE IS LIMITED TO 120 DEGREES FAHRENHEIT.
- THE HAND-HELD UNIT NEEDS TO BE REACHABLE WITHIN A HEIGHT OF 48" ABOVE THE SHOWER
FLOOR.
- HOSE AT LEAST 59" LONG.
ANSI/ICC 117.1 - CHAPTER 1104 - TYPE B UNITS
- FOR TYPE B UNITS, CLEAR FLOOR SPACES SHALL BE 48 INCHES MINIMUM IN LENGTH AND 30
INCHES MINIMUM IN WIDTH.
- SEE SHEETS G102 & G103 FOR ADDITIONAL ACCESSIBILITY DETAILS AND DIMENSIONS
1/2" = 1'-0"2 2ADA BATHROOM ELEV. 1ADA BATHROOM ELEV. 1
1/2" = 1'-0"4 4OPTION A BATHROOM PLANOPTION A BATHROOM PLAN
2' 4'0' 1'
1/2" = 1'-0"5 5OPT. A - BATHROOM ELEV. 1OPT. A - BATHROOM ELEV. 1
1/2" = 1'-0"6 6OPT. A - BATHROOM ELEV. 2OPT. A - BATHROOM ELEV. 2
2' 4'0' 1'
2' 4'0' 1'
1/2" = 1'-0"7 7OPTION B BATHROOM PLANOPTION B BATHROOM PLAN
1/2" = 1'-0"9 9OPT. B - BATHROOM ELEV. 2OPT. B - BATHROOM ELEV. 2
1/2" = 1'-0"8 8OPT. B - BATHROOM ELEV. 1OPT. B - BATHROOM ELEV. 1
2' 4'0' 1'
2' 4'0' 1'
2' 4'0' 1'
1/2" = 1'-0"10 10LAUNDRY ELEVATIONLAUNDRY ELEVATION
2' 4'0' 1'
Page 12 of 61
Page 97 of 116
B
G B
C
D
E
A
C
D
E
A
C
D
E
C
D
E
A A A A A A
CC
C
D D
C
C C C C
I I II
I I
H H H
F F
C
D
E
C
D
E
C
D
E
C
D
E
HH
CC C C
DD D D
I HI
F FF F
B
B G
A
A
D
E
C
D
E
C
D
E
C
D
E
C
IECC 402.1 PRESCRIPTIVE METHOD FOR THERMAL ENVELOPE ASSEMBLIES
IEBC 908.1 APPLIES TO NEW CONSTRUCTION ONLY
BUILDING USES U-VALUE BASED METHOD, C402.1.4 CLIMATE ZONE 6
ATTIC INSULATION = U-0.021
WALLS BELOW GRADE, U-0.119
METAL FRAMED WALLS, U-0.064
WOOD FRAMED FLOORS, U-0.033
BUILDING USES U-VALUE BASED METHOD, C402.4 CLIMATE ZONE 6
OPERABLE FENESTRATION, U - 0.43
SHADING COEFFICIENT, 0.40
ASSEMBLIES SHOWN ON PLANS AND SECTIONS COMPLY WITH AND PROVIDE
BETTER THERMAL INSULATION THAN REQUIRED BY PRESCRIPTIVE METHOD VALUES SHOWN ABOVE.
AIR LEAKAGE 0.3 PER 402.5.2
MANUFACTURER'S DATA STICKER SHALL BE LEFT ON WINDOWS AND
DOORS UNTIL FINAL INSPECTION
ATTIC INSULATION = R-47.62
WALLS BELOW GRADE, R-8.40
METAL FRAMED WALLS, R-15.63
WOOD FRAMED FLOORS, R-30.30
OPERABLE FENESTRATION, R-2.32
OPAQUE SWINGING DOORS, U-0.37 OPAQUE SWINGING DOORS, R-2.27
FIXED FENESTRATION, U - 0.36 FIXED FENESTRATION, R-2.77
WOOD FRAMED WALLS, U-0.051 WOOD FRAMED WALLS, R-19.60
INSIDE AIR FILM
5_
8 " GYP WALL BRD
" GYP 1-HR SHEATHING
STUD CAVITY
1_
2" SIDING
OUTSIDE AIR FILM
.68
.54
.54
21
.81
.17
COMPONENT
R-VALUE @
CAVITY
TOTAL 23.74
INSIDE AIR FILM
STUD
1_
2 " SIDING
OUTSIDE AIR FILM
.54
.54
6.88
.81
COMPONENT
TOTAL 9.62
2"x6", 16" OC TOTAL WALL R-VALUE = .093 x (0.104) + .907 (0.042)
0.00967 + 0.038084
0.0478 WALL U-VALUE
%of STUD %of CAVITYU of STUD U of CAVITY
.68
.17
R-VALUE @
STUD
=
=
0.104
U-VALUE @
STUD
U-VALUE @
CAVITY
0.042
5_
8
5_
8 " GYP WALL BRD
" GYP 1-HR SHEATHING5_
8
ROOF DECK INSUL ENTIRELY ABOVE DECK, U-0.032 WOOD FRAMED WALLS, R-19.60
ENTRY DOORS, U - 0.77 ENTRY DOORS, R-2.32
715-572-2698
inquiry_arccentral@outlook.com
ARC CENTRAL LLC
PROJECT NO.
DATE
REVISIONS
© Arc Central LLC 2025
ARCHITECTURE, CONSTRUCTIONMANAGEMENT, INTERIOR DESIGN
PROPOSED PLANS
FOR
COPYRIGHT © Arc Central LLC 2025 All Rights Reserved
ALL DRAWINGS ARE TO THE SCALE SHOWN ON THE SHEETS. THEY ARE INTENDED TO BE PRINTED ON 24x36" SHEETS. IF THEY ARE
PRINTED ON A DIFFERENT SIZE SHEET THE SCALE NEEDS TO BE ADJUSTED ACCORDINGLY. A201
25109
August 21, 2025
0 Third Street, Stevens Point,
Wisconsin 54481
EXTERIOR BUILDING
ELEVATIONSTHIRD STREET CONDOMINIUMS
SHEET NOTES:
SAFETY GLAZING SHALL BE INSTALLED IN ALL OF THE FOLLOWING CONDITIONS:
- SIDELITES WITHIN 24" OF ENTRY DOORS
SAFETY GLAZING SHALL BE INSTALLED AT WINDOWS WHERE ALL OF THE FOLLOWING CONDITIONS ARE MET.
- EXPOSED AREA OF GLAZING EXCEEDS 9 SQ FT.
- THE BOTTOM EDGE OF WINDOW IS LESS THAN 18" ABOVE THE FLOOR
- THE TOP EDGE OF THE WINDOW IS GREATER THAN 36" ABOVE THE FLOOR
- A WALKING SURFACE IS WITHIN 36" HORIZONTALLY FROM THE WINDOW.
SAFETY GLAZING SHALL BE IDENTIFIED AS SUCH BY MANUFACTURER
1/8" = 1'-0"1 1WEST WEST
1/8" = 1'-0"2 2SOUTH SOUTH
1/8" = 1'-0"3 3NORTH NORTH
1/8" = 1'-0"4 4EAST EAST
16'0' 4' 8'
16'0' 4' 8' 16'0' 4' 8'
16'0' 4' 8'
Prelim. Plan 7.14.25
Const. Docs Date
Approval Date
Revision 1 Date
Revision 2 Date
Page 13 of 61
Page 98 of 116
8'-1 1/8"8'-1 1/8"8'-1 1/8"
A303
1A302
1
8'-1 1/8"1'-0"8'-1 1/8"1'-0"
3'-6"
TRUSS BEARING
9'-2 3/8"
TRUSS BEARING
11'-2 3/8"
715-572-2698
inquiry_arccentral@outlook.com
ARC CENTRAL LLC
PROJECT NO.
DATE
REVISIONS
© Arc Central LLC 2025
ARCHITECTURE, CONSTRUCTIONMANAGEMENT, INTERIOR DESIGN
PROPOSED PLANS
FOR
COPYRIGHT © Arc Central LLC 2025 All Rights Reserved
ALL DRAWINGS ARE TO THE SCALE SHOWN ON THE SHEETS. THEY ARE INTENDED TO BE PRINTED ON 24x36" SHEETS. IF THEY ARE
PRINTED ON A DIFFERENT SIZE SHEET THE SCALE NEEDS TO BE ADJUSTED ACCORDINGLY. A301
25109
August 21, 2025
0 Third Street, Stevens Point,
Wisconsin 54481
BUILDING SECTIONSTHIRD STREET CONDOMINIUMS
1/4" = 1'-0"1 1BUILDING SECTION 1BUILDING SECTION 1
1/4" = 1'-0"2 2BUILDING SECTION 2BUILDING SECTION 2
1/4" = 1'-0"3 3BUILDING SECTION 3BUILDING SECTION 3
0' 8'0' 2' 4' 0' 8'0' 2' 4'
0' 8'0' 2' 4'
Prelim. Plan 7.14.25
Const. Docs Date
Approval Date
Revision 1 Date
Revision 2 Date
Page 14 of 61
Page 99 of 116
ROOF STRUCTURE:
- EPDM MEMBRANE
- 1/2" HIGH DENSITY FIBER BOARD
- 5/8" OSB SHEATHING
- PRE-ENGINEERED ROOF TRUSSES, 24" O.C.,
1/4" : 12 PITCH
- R-49 BLOWN CELLULOSE INSULATION
- ALUMINUM SOFFIT & FASCIA
TYPICAL EXTERIOR WALL:
- SIDING SELECTED BY OWNER, EXTERIOR
- AIR BARRIER
- 1/2" OSB SHEATHING
- R-21 DENSE-PACKED FIBERGLASS INSULATION
- 2" x 6" STUD FRAMING, 16" O.C.
- 6 MIL POLYETHYLENE VAPOR BARRIER
- 5/8" GYPSUM WALL BOARD, INTERIOR
FLOOR STRUCTURE:
- T&G OSB FLOOR DECK SCREWED
AND GLUED TO FLOOR JOISTS
- 2" x 12" FLOOR JOISTS, 16" O.C.
SEE SHEET S100 FOR FOUNDATION DETAILS
ROOF STRUCTURE:
- EPDM MEMBRANE
-1/2" HIGH DENSITY FIBER BOARD
- 5/8" OSB SHEATHING
- PRE-ENGINEERED ROOF TRUSSES, 24" O.C.,
1/4" : 12 PITCH
- R-49 BLOWN CELLULOSE INSULATION
- ALUMINUM SOFFIT & FASCIA
STOREFRONT WINDOW TYPE H,
SEE SHEET A600 FOR DETAILS
BALCONY FLOOR JOISTS, SEE
SHEET S101 FOR FRAMING PLANS
TYPICAL EXTERIOR WALL:
- SIDING SELECTED BY OWNER, EXTERIOR
- AIR BARRIER
- 1/2" OSB SHEATHING
- R-21 DENSE-PACKED FIBERGLASS INSULATION
- 2" x 6" STUD FRAMING, 16" O.C.
- 6 MIL POLYETHYLENE VAPOR BARRIER
- 5/8" GYPSUM WALL BOARD, INTERIOR
FLOOR STRUCTURE:
- T&G OSB FLOOR DECK SCREWED
AND GLUED TO FLOOR JOISTS
- 2" x 12" FLOOR JOISTS, 16" O.C.
SEE SHEET S100 FOR FOUNDATION DETAILS
3'-6"
E
D
E
D
(2) 2 x 8 SPF WINDOW HEADER
(2) 2 x 8 SPF WINDOW HEADER
715-572-2698
inquiry_arccentral@outlook.com
ARC CENTRAL LLC
PROJECT NO.
DATE
REVISIONS
© Arc Central LLC 2025
ARCHITECTURE, CONSTRUCTIONMANAGEMENT, INTERIOR DESIGN
PROPOSED PLANS
FOR
COPYRIGHT © Arc Central LLC 2025 All Rights Reserved
ALL DRAWINGS ARE TO THE SCALE SHOWN ON THE SHEETS. THEY ARE INTENDED TO BE PRINTED ON 24x36" SHEETS. IF THEY ARE
PRINTED ON A DIFFERENT SIZE SHEET THE SCALE NEEDS TO BE ADJUSTED ACCORDINGLY. A302
25109
August 21, 2025
0 Third Street, Stevens Point,
Wisconsin 54481
WALL DETAILSTHIRD STREET CONDOMINIUMS
Prelim. Plan 7.14.25
Const. Docs Date
Approval Date
Revision 1 Date
Revision 2 Date
1/2" = 1'-0"1 1WALL DETAIL 1WALL DETAIL 1
1/2" = 1'-0"2 2WALL DETAIL 2WALL DETAIL 2
2' 4'0' 1' 2' 4'0' 1'
Page 15 of 61
Page 100 of 116
8'-1 1/8"1'-0"8'-1 1/8"1'-0"8'-1 1/8"
9'-1 1/8"
3'-6"
A303
3
5'-0 1/2"5'-0 1/2"
6 1/16"
11"
3/4" OSB RISERS
15/16" PARTICLEBOARD TREADS
WOOD STRINGERS, 12" O.C.
715-572-2698
inquiry_arccentral@outlook.com
ARC CENTRAL LLC
PROJECT NO.
DATE
REVISIONS
© Arc Central LLC 2025
ARCHITECTURE, CONSTRUCTIONMANAGEMENT, INTERIOR DESIGN
PROPOSED PLANS
FOR
COPYRIGHT © Arc Central LLC 2025 All Rights Reserved
ALL DRAWINGS ARE TO THE SCALE SHOWN ON THE SHEETS. THEY ARE INTENDED TO BE PRINTED ON 24x36" SHEETS. IF THEY ARE
PRINTED ON A DIFFERENT SIZE SHEET THE SCALE NEEDS TO BE ADJUSTED ACCORDINGLY. A303
25109
August 21, 2025
0 Third Street, Stevens Point,
Wisconsin 54481
STAIR DETAILSTHIRD STREET CONDOMINIUMS
Prelim. Plan 7.14.25
Const. Docs Date
Approval Date
Revision 1 Date
Revision 2 Date
1/2" = 1'-0"1 1STAIR SECTIONSTAIR SECTION
1/2" = 1'-0"2 2SECOND FLOOR STAIR PLANSECOND FLOOR STAIR PLAN
N2' 4'0' 1' 2' 4'0' 1'
3" = 1'-0"3 3STAIR TREAD DETAILSTAIR TREAD DETAIL
0' 6"1 1/2" 3"
STAIR CODE REQUIREMENTS (IBC 2021):
RISER HEIGHT AND TREAD DEPTH (1011.5.2)
- STAIR RISER HEIGHTS SHALL BE 7 INCHES MAXIMUM AND 4 INCHES MINIMUM. RECTANGULAR TREAD DEPTHS SHALL BE 11 INCHES MINIMUM.
STAIRWAY WALKING SURFACE (1011.7.1)
- STAIRWAY TREADS AND LANDINGS SHALL HAVE A SOLID SURFACE. FINISH FLOOR SURFACES SHALL BE SECURELY ATTACHED.
HANDRAIL HEIGHT (1014.2)
- HANDRAIL HEIGHT, MEASURED ABOVE STAIR TREAD NOSINGS, OR FINISH SURFACE OF RAMP SLOPE, SHALL BE UNIFORM, NOT LESS THAN
34 INCHES AND NOT MORE THAN 38 INCHES.
HANDRAIL GRASPABILITY - TYPE I (1014.3.1)
- HANDRAILS WITH A CIRCULAR CROSS SECTION SHALL HAVE AN OUTSIDE DIAMETER OF NOT LESS THAN 1 1/4 INCHES AND NOT GREATER
THAN 2 INCHES.
HANDRAIL CONTINUITY (1014.4)
- HANDRAIL GRIPPING SURFACES SHALL BE CONTINUOUS, WITHOUT INTERRUPTION BY NEWEL POSTS OR OTHER OBSTRUCTIONS.
HANDRAIL EXTENSIONS (1014.6)
- HANDRAILS SHALL RETURN TO A WALL, GUARD, OR THE WALKING SURFACE OR SHALL BE CONTINUOUS TO THE HANDRAIL OF AN ADJACENT
FLIGHT OF STAIRS OR RAMP RUN.
GUARDS - WHERE REQUIRED (1015.2)
- GUARDS SHALL BE LOCATED ALONG OPEN-SIDED WALKING SURFACES, INCLUDING MEZZANINES, EQUIPMENT PLATFORMS, AISLES, STAIRS,
RAMPS, AND LANDINGS THAT ARE LOCATED MORE THAN 30 INCHES MEASURED VERTICALLY TO THE FLOOR OR GRADE BELOW AT ANY POINT
WITHIN 36 INCHES HORIZONTALLY TO THE EDGE OF THE OPEN SIDE.
GUARD HEIGHT (1015.3)
- REQUIRED GUARDS SHALL BE NOT LESS THAN 42 INCHES HIGH.
GUARD - OPENING LIMITATIONS (1015.4)
- REQUIRED GUARDS SHALL NOT HAVE OPENINGS THAT ALLOW PASSAGE OF A SPHERE 4 INCHES IN DIAMETER FROM THE WALKING SURFACE
TO THE REQUIRED GUARD HEIGHT
Page 16 of 61
Page 101 of 116
FIN FLR
5
5'-6" 1'-6"
3'-0"
A
2'-0" 5'-0"
2'-0"
B
ASSEMBLY 1
2'-0" 5'-0"
6'-0"
C
D
E
OVERALL WIDTH
12'-0"
OVERALL HEIGHT
7'-0"
OVERALL WIDTH
12'-0"
OVERALL HEIGHT
7'-0"
9 1/4"
CL CL CL
CL
2'-11"
CL
2'-10 1/2"
CL
2'-10 1/2"
CL
3'-2"
I
CLCLCL
CL
2'-11"
CL
2'-10 1/2"
CL
2'-10 1/2"
CL
3'-2"
I
CL
6'-10"
STOREFRONT
TYPE F
STOREFRONT
TYPE F
THIRD FLOOR
18' - 2 1/4"
T.O. 2ND FLR
17' - 2 1/4"
ROOF
26' - 3 3/8"
OVERALL HEIGHT
7'-0"
OVERALL WIDTH
3'-0"
CL
6'-10"
CL
2'-4 1/2"
BRAKE METAL
OVER COLUMN
STOREFRONT TYPE G
THIRD FLOOR
18' - 2 1/4"T.O. 2ND FLR
17' - 2 1/4"
ROOF
26' - 3 3/8"OVERALL WIDTH
12'-0"
CL
6'-10"
BRAKE METAL
OVER COLUMN
STOREFRONT
TYPE H
CL CL CL
CL
3'-2"
CL
2'-8 3/4"
CL
2'-8 3/4"
CL
2'-9"
OVERALL HEIGHT
7'-0"
SECOND FLOOR
9' - 1 1/8"
T.O. 1ST FLR
8' - 1 1/8"
THIRD FLOOR
18' - 2 1/4"
T.O. 2ND FLR
17' - 2 1/4"
CL
4'-9"
STOREFRONT TYPE I
CL
CL
3'-0"
CL
3'-0"
WINDOW SCHEDULE
TYPE WIDTH HEIGHT COUNT COMMENTS
FIRST FLOOR
A 3' - 0" 1' - 6" 2
C 3' - 0" 5' - 0" 4
D 3' - 0" 2' - 6" 4
E 3' - 0" 2' - 6" 8
SECOND FLOOR
A 3' - 0" 1' - 6" 2
C 3' - 0" 5' - 0" 12
D 3' - 0" 2' - 6" 6
E 3' - 0" 2' - 6" 8
THIRD FLOOR
B 2' - 0" 5' - 0" 2
C 3' - 0" 5' - 0" 8
D 3' - 0" 2' - 6" 2
E 3' - 0" 2' - 6" 2
715-572-2698
inquiry_arccentral@outlook.com
ARC CENTRAL LLC
PROJECT NO.
DATE
REVISIONS
© Arc Central LLC 2025
ARCHITECTURE, CONSTRUCTIONMANAGEMENT, INTERIOR DESIGN
PROPOSED PLANS
FOR
COPYRIGHT © Arc Central LLC 2025 All Rights Reserved
ALL DRAWINGS ARE TO THE SCALE SHOWN ON THE SHEETS. THEY ARE INTENDED TO BE PRINTED ON 24x36" SHEETS. IF THEY ARE
PRINTED ON A DIFFERENT SIZE SHEET THE SCALE NEEDS TO BE ADJUSTED ACCORDINGLY. A600
25109
August 21, 2025
0 Third Street, Stevens Point,
Wisconsin 54481
WINDOW SCHEDULE AND
DETAILSTHIRD STREET CONDOMINIUMS
1/4" = 1'-0"
WINDOW LEGENDWINDOW LEGEND
0' 8'0' 2' 4'
1/4" = 1'-0"1 1STOREFRONT DETAIL 1STOREFRONT DETAIL 1
1/4" = 1'-0"2 2STOREFRONT DETAIL 2STOREFRONT DETAIL 2
1/4" = 1'-0"3 3STOREFRONT DETAIL 3STOREFRONT DETAIL 3
1/4" = 1'-0"4 4STOREFRONT DETAIL 4STOREFRONT DETAIL 4
0' 8'0' 2' 4'
0' 8'0' 2' 4'
0' 8'0' 2' 4'
0' 8'0' 2' 4'
Prelim. Plan 7.14.25
Const. Docs Date
Approval Date
Revision 1 Date
Revision 2 Date
ROOM FINISH SCHEDULE
ROOM NAME
FINISH ROOM
COUNT COMMENTSFLOOR BASE WALL CEILING
FIRST FLOOR
UNIT 1 BATHROOM PAINT - WHITE PAINT - WHITE 2
UNIT 1 BEDROOM 1 PAINT - WHITE PAINT - WHITE 2
UNIT 1 BEDROOM 1 CLOSET PAINT - WHITE PAINT - WHITE 2
UNIT 1 BEDROOM 2 PAINT - WHITE PAINT - WHITE 2
UNIT 1 BEDROOM 2 CLOSET PAINT - WHITE PAINT - WHITE 2
UNIT 1 ENTRY PAINT - WHITE PAINT - WHITE 2
UNIT 1 KITCHEN PAINT - WHITE PAINT - WHITE 2
UNIT 1 LAUNDRY ROOM PAINT - WHITE PAINT - WHITE 2
UNIT 1 LIVING ROOM PAINT - WHITE PAINT - WHITE 2
UNIT 1 MECHANICAL CLOSET PAINT - WHITE PAINT - WHITE 2
SECOND FLOOR
BALCONY 2
UNIT 1 BATHROOM PAINT - WHITE PAINT - WHITE 2
UNIT 1 BEDROOM 1 PAINT - WHITE PAINT - WHITE 2
UNIT 1 BEDROOM 1 CLOSET PAINT - WHITE PAINT - WHITE 2
UNIT 1 BEDROOM 2 PAINT - WHITE PAINT - WHITE 2
UNIT 1 BEDROOM 2 CLOSET PAINT - WHITE PAINT - WHITE 2
UNIT 1 COAT CLOSET PAINT - WHITE PAINT - WHITE 2
UNIT 1 ENTRY PAINT - WHITE PAINT - WHITE 2
UNIT 1 KITCHEN PAINT - WHITE PAINT - WHITE 2
UNIT 1 LAUNDRY ROOM PAINT - WHITE PAINT - WHITE 2
UNIT 1 LIVING ROOM PAINT - WHITE PAINT - WHITE 2
UNIT 1 MECHANICAL CLOSET PAINT - WHITE PAINT - WHITE 2
THIRD FLOOR
BALCONY 2
UNIT 2 BATHROOM PAINT - WHITE PAINT - WHITE 2
UNIT 2 BEDROOM PAINT - WHITE PAINT - WHITE 2
UNIT 2 BEDROOM CLOSET PAINT - WHITE PAINT - WHITE 2
UNIT 2 ENTRY PAINT - WHITE PAINT - WHITE 2
UNIT 2 KITCHEN PAINT - WHITE PAINT - WHITE 2
UNIT 2 LAUNDRY ROOM PAINT - WHITE PAINT - WHITE 2
UNIT 2 LIVING ROOM PAINT - WHITE PAINT - WHITE 2
UNIT 2 MECHANICAL CLOSET PAINT - WHITE PAINT - WHITE 2
Page 17 of 61
Page 102 of 116
715-572-2698
inquiry_arccentral@outlook.com
ARC CENTRAL LLC
PROJECT NO.
DATE
REVISIONS
© Arc Central LLC 2025
ARCHITECTURE, CONSTRUCTIONMANAGEMENT, INTERIOR DESIGN
PROPOSED PLANS
FOR
COPYRIGHT © Arc Central LLC 2025 All Rights Reserved
ALL DRAWINGS ARE TO THE SCALE SHOWN ON THE SHEETS. THEY ARE INTENDED TO BE PRINTED ON 24x36" SHEETS. IF THEY ARE
PRINTED ON A DIFFERENT SIZE SHEET THE SCALE NEEDS TO BE ADJUSTED ACCORDINGLY. A701
25109
August 21, 2025
0 Third Street, Stevens Point,
Wisconsin 54481
3D VIEWSTHIRD STREET CONDOMINIUMS
Prelim. Plan 7.14.25
Const. Docs Date
Approval Date
Revision 1 Date
Revision 2 Date
Page 18 of 61
Page 103 of 116
25'-0"
12'-0" 25'-0" 13'-0"
5'-0"
4'-0"
13'-0"
13'-0"
14'-0"
6'-0"
26'-0"
6'-0"
14'-0"
27'-0"
22'-0"13'-0"
1'-0"
26'-0" 25'-0"
12'-0"
1'-0"
25'-0"
4'-0"
9'-9 1/2" 12'-6 1/2"
5'-0"
13'-6 1/2"
5'-0"
8'-9 1/2"
10'-1 1/2"
9'-9 1/2"
2
S100
3
S100
4
S100
5'-0"
5
S100
NOTCH SLAB AT OVERHEAD DOORS
20" x 10" AT INTERIOR
BEARING WALLS
20" x 10" AT INTERIOR
BEARING WALLS
20" x 10" AT INTERIOR
BEARING WALLS
20" x 10" AT INTERIOR
BEARING WALLS
20" x 10" AT INTERIOR
BEARING WALLS
ACOUSTIC INSULATION BETWEEN UNITS
R-10 EXTRUDED POLYSTYRENE
INSULATION UNDER SLAB
TREATED 2" x 4" SILL PLATE ANCHOR
TO FOUNDATION W/ 1/2" x 5-1/2"
EXPANSION ANCHORS, 72" O.C.
10" x 2'-0" CONCRETE THICKENED
SLAB, THREE #5 BARS CONTINUOUS
10"
CL4"
1'-8"
CL4"
10"
1'-8"
R-10 EXTRUDED POLYSTYRENE
INSULATION UNDER SLAB
TREATED 2" x 4" SILL PLATE
ANCHOR TO FOUNDATION
W/ 1/2" x 5-1/2" EXPANSION
ANCHORS, 72" O.C.
10" x 2'-0" CONCRETE
THICKENED SLAB, THREE
#5 BARS CONTINUOUS
TAPER SLAB 3/4" AT OVERHEAD DOOR
CL
8"
4'-0"
CL4"
10"
1'-8"
TAPER SLAB 1/4" : 12 AWAY FROM BLDG
8" x 48" CONCRETE CAST-IN-PLACE
FOUNDATION WALL
SLABS AND WALLS SHOULD BE 4,000
PSI MIX, AIR ENTRAINED. REINFORCE
SLABS WITH FIBRILLATED FIBER MESH
20" x 10" CONCRETE FOOTING
WITH (3) #5 CONTINUOUS BARS
R-20 FOAM INSULATION
CL4"
4'-0"10"
1'-8"
TYPICAL EXTERIOR WALL - SEE
SHEET A302 FOR WALL DETAIL
TREATED 2" x 6" SILL PLATE ANCHOR
TO FOUNDATION W/ 1/2" x 5-1/2"
EXPANSION ANCHORS, 48" O.C.
R-20 FOAM INSULATION
CL
8"
8" x 48" CONCRETE CAST-IN-PLACE
FOUNDATION WALL
SLABS AND WALLS SHOULD BE 4,000
PSI MIX, AIR ENTRAINED. REINFORCE
SLABS WITH FIBRILLATED FIBER MESH
20" x 10" CONCRETE FOOTING
WITH (3) #5 CONTINUOUS BARS
715-572-2698
inquiry_arccentral@outlook.com
ARC CENTRAL LLC
PROJECT NO.
DATE
REVISIONS
© Arc Central LLC 2025
ARCHITECTURE, CONSTRUCTIONMANAGEMENT, INTERIOR DESIGN
PROPOSED PLANS
FOR
COPYRIGHT © Arc Central LLC 2025 All Rights Reserved
ALL DRAWINGS ARE TO THE SCALE SHOWN ON THE SHEETS. THEY ARE INTENDED TO BE PRINTED ON 24x36" SHEETS. IF THEY ARE
PRINTED ON A DIFFERENT SIZE SHEET THE SCALE NEEDS TO BE ADJUSTED ACCORDINGLY. S100
25109
August 21, 2025
0 Third Street, Stevens Point,
Wisconsin 54481
FOUNDATION PLAN &
DETAILSTHIRD STREET CONDOMINIUMS
SHEET NOTES:
ALL CAST-IN-PLACE CONTINUOUS CONCRETE SLAB FOOTINGS AND GRADE BEAMS SHALL BE MIXED
TO ACHIEVE A COMPRESSIVE STRENGTH 4,000 PSI MINIMUM, AND SHALL BE AIR ENTRAINED
CONCRETE MIX SHALL CONTAIN FIBRILLATED FIBERMESH REINFORCING, 1.5 LBS PER CUBIC YARD
Prelim. Plan 7.14.25
Const. Docs Date
Approval Date
Revision 1 Date
Revision 2 Date
1/4" = 1'-0"1 1FOUNDATION PLANFOUNDATION PLAN
0' 8'0' 2' 4' N
3/4" = 1'-0"2 2FTG @ UNIT PARTITIONFTG @ UNIT PARTITION
3/4" = 1'-0"3 3FTG @ BEARING WALLSFTG @ BEARING WALLS
0' 2'1'6"
0' 2'1'6"
3/4" = 1'-0"4 4FTG @ O.H. DOORFTG @ O.H. DOOR
0' 2'1'6"
3/4" = 1'-0"5 5TYP. FTG DETAILTYP. FTG DETAIL
0' 2'1'6"
Page 19 of 61
Page 104 of 116
DN
UP
DN
2" x 12" FLOOR JOISTS, 16" O.C. 2" x 12" FLOOR JOISTS, 16" O.C.
715-572-2698
inquiry_arccentral@outlook.com
ARC CENTRAL LLC
PROJECT NO.
DATE
REVISIONS
© Arc Central LLC 2025
ARCHITECTURE, CONSTRUCTIONMANAGEMENT, INTERIOR DESIGN
PROPOSED PLANS
FOR
COPYRIGHT © Arc Central LLC 2025 All Rights Reserved
ALL DRAWINGS ARE TO THE SCALE SHOWN ON THE SHEETS. THEY ARE INTENDED TO BE PRINTED ON 24x36" SHEETS. IF THEY ARE
PRINTED ON A DIFFERENT SIZE SHEET THE SCALE NEEDS TO BE ADJUSTED ACCORDINGLY. S101
25109
August 21, 2025
0 Third Street, Stevens Point,
Wisconsin 54481
FLOOR FRAMING PLANSTHIRD STREET CONDOMINIUMS
1/4" = 1'-0"1 1SECOND FLOOR FRAMING PLANSECOND FLOOR FRAMING PLAN
1/4" = 1'-0"2 2THIRD FLOOR FRAMING PLANTHIRD FLOOR FRAMING PLAN
0' 8'0' 2' 4'0' 8'0' 2' 4'
Prelim. Plan 7.14.25
Const. Docs Date
Approval Date
Revision 1 Date
Revision 2 Date
NN
SHEET NOTES:
1. ALL WINDOW AND DOOR HEADERS TO HAVE (2) 2" x 8" SPF HEADERS UNLESS NOTED OTHERWISE.
Page 20 of 61
Page 105 of 116
DN
2'-0"
PRE-ENGINEERED TAPERED
ROOF TRUSSES, 24" O.C.,
TOWARDS ROOF DRAIN
ROOF DRAIN
ROOF DRAIN
SLOPE 1/4" PER FOOT
SLOPE 1/4" PER FOOT
SLOPE 1/4" PER FOOT
SLOPE 1/4" PER FOOT
ROOF DRAIN
ROOF DRAIN
PRE-ENGINEERED ROOF
TRUSSES, 24" O.C., 1/4" : 12 PITCH
*SEE SHEET A301
FOR ROOF HEIGHTS*
2'-0"
ROOF DRAIN
CLAMP RING
ROOF MEMBRANE
RIGID FOAM INSULATION
SLOPED 1/4" PER EVERY
FOOT OF RISE
OSB SHEATHING
WITH WATER
RESISTIVE BARRIER
715-572-2698
inquiry_arccentral@outlook.com
ARC CENTRAL LLC
PROJECT NO.
DATE
REVISIONS
© Arc Central LLC 2025
ARCHITECTURE, CONSTRUCTIONMANAGEMENT, INTERIOR DESIGN
PROPOSED PLANS
FOR
COPYRIGHT © Arc Central LLC 2025 All Rights Reserved
ALL DRAWINGS ARE TO THE SCALE SHOWN ON THE SHEETS. THEY ARE INTENDED TO BE PRINTED ON 24x36" SHEETS. IF THEY ARE
PRINTED ON A DIFFERENT SIZE SHEET THE SCALE NEEDS TO BE ADJUSTED ACCORDINGLY. S102
25109
August 21, 2025
0 Third Street, Stevens Point,
Wisconsin 54481
ROOF FRAMING PLAN AND
DETAILSTHIRD STREET CONDOMINIUMS
28.0 = 0.7 x 40 x 1 x 1 x 1 x 1
SHEET NOTE:
TRUSS MANUFACTURER TO PREPARE AND PROVIDE STAMPED COPIES OF TRUSS
PLANS AND ENGINEERED CALCUALTIONS TO THE ARCHITECT FOR SUBMITTAL TO
THE STATE PRIOR TO INSTALLATION OF THE TRUSSES.
TRUSS MANUFACTURER TO INCLUDE UNBALANCED AND SNOWDRIFT LOADS IN THEIR
CALCULATIONS. NEW TRUSS SYSTEM SHALL BE DESIGNED ACCORDINGLY.
TRUSS SUPPLIER SHALL PREPARE TRUSS COMPONENT SUBMITTAL
INFORMATION FOR STATE APPROVAL TO INCLUDE CALCULATIONS AND
DRAWINGS FOR SNOW LOADS AS FOLLOWS:
GROUND SNOW LOAD Pg =
BUILDING IS LOCATED IN PORTAGE COUNTY
IMPORTANCE FACTOR Is =
EXOSURE FACTOR Ce =
SLOPE FACTOR Ps =
THERMAL FACTOR Ct =
40 PSF
1.0
1.0
1.0
1.0
ROOF SNOW LOAD ___ = 0.7 x Pg x Ps x Ce x Is x Ct
CATEGORY II
EXPOSURE B
HEATED STRUC
ROOF SNOW LOAD
LATERAL LOADS SHALL BE BASED ON WIND SPEED OF 90 MPH, 20 PSF
LATERAL LOAD
PER IBC 1608.2
1/8" = 1'-0"2 2ROOF FRAMING PLANROOF FRAMING PLAN
1/8" = 1'-0"3 3ROOF PLANROOF PLAN
16'0' 4' 8' 16'0' 4' 8'
1/8" = 1'-0"1 1GARAGE ROOF FRAMING PLANGARAGE ROOF FRAMING PLAN
16'0' 4' 8'
Prelim. Plan 7.14.25
Const. Docs Date
Approval Date
Revision 1 Date
Revision 2 Date
N
NN
1 1/2" = 1'-0"4 4ROOF DRAIN DETAILROOF DRAIN DETAIL
1'3"0' 6"
Page 21 of 61
Page 106 of 116
UP
Dryer Washer
Washer Dryer
WP WP
WP
WP
WP
WP
WP
WP
WP WP
D
D
DD
D
D
D
D
3 3
3 3
D
D
D
D
D D
D
3
3
D
D
D 3
3 3
3
OUTDOOR PASSAGEWAY LIGHTS TO BE ON A TIMER FROM DUSK TO DAWN.
MOTION SENSOR FOR DURING DAY.
715-572-2698
inquiry_arccentral@outlook.com
ARC CENTRAL LLC
PROJECT NO.
DATE
REVISIONS
© Arc Central LLC 2025
ARCHITECTURE, CONSTRUCTIONMANAGEMENT, INTERIOR DESIGN
PROPOSED PLANS
FOR
COPYRIGHT © Arc Central LLC 2025 All Rights Reserved
ALL DRAWINGS ARE TO THE SCALE SHOWN ON THE SHEETS. THEY ARE INTENDED TO BE PRINTED ON 24x36" SHEETS. IF THEY ARE
PRINTED ON A DIFFERENT SIZE SHEET THE SCALE NEEDS TO BE ADJUSTED ACCORDINGLY. E101
25109
August 21, 2025
0 Third Street, Stevens Point,
Wisconsin 54481
1ST FLR POWER &
LIGHTING PLANTHIRD STREET CONDOMINIUMS
0' 8'0' 2' 4'
Prelim. Plan 7.14.25
Const. Docs Date
Approval Date
Revision 1 Date
Revision 2 Date
1/4" = 1'-0"1 1FIRST FLOOR ELECTRICAL PLANFIRST FLOOR ELECTRICAL PLAN
N
Page 22 of 61
Page 107 of 116
DN
UP
DryerWasher
DryerWasher
WP WP
D
D
D
D D
D
F
F D
D
D
D
D
D
DD
D
D
D
D
D
D
3 3
3 3
3
3
3
3
33
33
DN
WP
WP
D
D
D F
D D
D F
D
D D
D
D
D D
D
D 3 3
3 3
3
3
D 3 3 3
33
3
PASSAGEWAY LIGHTS TO BE MOTION SENSORED
PASSAGEWAY LIGHTS TO BE MOTION SENSORED
715-572-2698
inquiry_arccentral@outlook.com
ARC CENTRAL LLC
PROJECT NO.
DATE
REVISIONS
© Arc Central LLC 2025
ARCHITECTURE, CONSTRUCTIONMANAGEMENT, INTERIOR DESIGN
PROPOSED PLANS
FOR
COPYRIGHT © Arc Central LLC 2025 All Rights Reserved
ALL DRAWINGS ARE TO THE SCALE SHOWN ON THE SHEETS. THEY ARE INTENDED TO BE PRINTED ON 24x36" SHEETS. IF THEY ARE
PRINTED ON A DIFFERENT SIZE SHEET THE SCALE NEEDS TO BE ADJUSTED ACCORDINGLY. E102
25109
August 21, 2025
0 Third Street, Stevens Point,
Wisconsin 54481
2ND & 3RD FLR POWER &
LIGHTING PLANTHIRD STREET CONDOMINIUMS
0' 8'0' 2' 4'
Prelim. Plan 7.14.25
Const. Docs Date
Approval Date
Revision 1 Date
Revision 2 Date
1/4" = 1'-0"1 1SECOND FLOOR ELECTRICAL PLANSECOND FLOOR ELECTRICAL PLAN
1/4" = 1'-0"2 2THIRD FLOOR ELECTRICAL PLANTHIRD FLOOR ELECTRICAL PLAN
0' 8'0' 2' 4' N N
Page 23 of 61
Page 108 of 116
715-572-2698
inquiry_arccentral@outlook.com
ARC CENTRAL LLC
PROJECT NO.
DATE
REVISIONS
© Arc Central LLC 2025
ARCHITECTURE, CONSTRUCTIONMANAGEMENT, INTERIOR DESIGN
PROPOSED PLANS
FOR
COPYRIGHT © Arc Central LLC 2025 All Rights Reserved
ALL DRAWINGS ARE TO THE SCALE SHOWN ON THE SHEETS. THEY ARE INTENDED TO BE PRINTED ON 24x36" SHEETS. IF THEY ARE
PRINTED ON A DIFFERENT SIZE SHEET THE SCALE NEEDS TO BE ADJUSTED ACCORDINGLY. G101
25109
August 21, 2025
0 Third Street, Stevens Point,
Wisconsin 54481
FRAMING CONNECTIONS
SCHEDULETHIRD STREET CONDOMINIUMS
SHEET NOTES:
ALL FRAMING SHOULD BE SPF #2 OR BETTER
ALL FRAMING LUMBER IN CONTACT WITH GRADE OR MASONRY SHALL BE PRESSURE TREATED.
ALL HEADERS SHALL BE SUPPORTED BY MINIMUM OF TWO SHOULDER STUDS. SPANS OVER 10 FEET SHALL HAVE 5 1/2" MINIMUM BEARING
1
G101
2
G101
TYPICAL WALL SHEATHING SHEAR WALL SHEATHING
SHEAR WALL BRACING -
FASTEN SHEATHING TO STUD FRAMING WITH 8d NAILS 6"
O.C. AT ALL POINTS WHERE SHEETS CROSS FRAMING. SHEAR WALL
NAILING TO BE APPLIED WITHIN 8'-0" OF ALL BUILDING CORNERS.
EDGE NAIL, 8d
COMMON, 6" O.C.
FIELD NAIL, 8d
COMMON, 6" O.C.
7/16" OSB SHEATHING
EDGE NAIL, 8d
COMMON, 6" O.C.
FIELD NAIL, 8d
COMMON, 12" O.C.
7/16" OSB
SHEATHING
TYPICAL SHEATHING -
FASTEN SHEATHING TO STUD FRAMING AS INDICATED ABOVE.
6"
6"
1'-0"
6"
3
G101
ROOF SHEATHING
OSB SHEATHING, INSTALL 8d NAILS 6" OC AT
ALL POINTS WHERE SHEETS CROSS FRAMING.
INSTALL "H" CLIPS BETWEEN TRUSSES
ON THE LONG SIDE OF THE SHEETS
TOP CHORD OF ROOF TRUSSES
FASTEN OSB ROOF SHEATHING AS NOTED
Page 24 of 61
Page 109 of 116
+95'-0"
DISPENSER
SOAP
SHOWER
VALVE
WATER CLOSET
PIPE PROTECTION
LAVATORY CLEARANCES
BENEATH LAVATORY.
LATCH SIDE APPROACH - SWINGING DOORS
HINGE SIDE APPROACH - SWINGING DOORS
FRONT APPROACH - SWINGING DOORS
HOSE BIBB
URINAL
TOP OF LIP
CLOCK 1'-6" CHILDREN
1'-5" HANDICAPPED
MIRROR
3'-0" CHILDREN
3'-2" HANDICAPPED
LINE
FLOOR
FLOOR
LINE
DRYER
HAND/HAIR
24" PREFERRED
PAPER TOWEL
DISPENSER
APPROACH
X = 42" MIN. IF Y = 54"
X = 36" MIN. IF Y = 60"
* 54" MIN. IF DOOR HAS CLOSER
APPROACH
NOTE:
APPROACH
TOILET PAPERROBE
HOOK
PARTITION
AT TOILET
6'-0" (WOMEN)
5'-0" (CHILDREN)
HEAD
SHOWER
HOLDER
PARTITION
AT URINAL
LINE
FLOOR
FLOOR
LINE
TOWEL DISPENSER/
WASTE RECEPTACLE
EWC
HOSE
VALVE
CLEAR FLOOR SPACE
SANITARY NAPKIN-
TAMPON DISPENSER
CLEAR
SPACE
FLOOR
APPROACH
@ FIXTURES
FLOOR
LINE
SPACE
FLOOR
CLEAR
A LATCH & CLOSER
* 48" MIN. IF DOOR HAS BOTH
* 48" MIN. IF DOOR HAS CLOSER
APPROACH
APPROACH
BEYOND RIM
NOT EXTEND
OR SHIELDS DO
SANITARY NAPKIN
DISPOSAL UNIT
30" X 48"
SPACE
CLEAR
CLEAR FLOOR
LEVEL OF
COIN SLOT
SIAMESE
GRAB BARS
FLOOR
LINE
AS REQUIRED
SOLID BLOCKING
FIRE HOSE CABINET
FLOOR
LINE
2
WINDOW
INDICATOR
GAS
MAING
PROJECTION
SCREEN
DRINKING
FOUNTAIN
MISCELLANEOUS SYMBOLS
WATER CLOSET
(TANK)
EWS
EYE
WASH
SINK
DF
LAV
SERVICE
SINK
LAVATORY
CENTER
LINE
U
WC/T
WC
URINAL
WATER
CLOSET
PROPERTY
LINE
CONSTRUCTION
LIMIT
SAN
STM
FP
E
T
SANITARY
SILT
FENCE
FENCE
RAILROAD
TRACKS
SETBACK
LINE
ELECTRIC
STORM
TELEPHONE
FIRE
PROTECTION
GENERAL NOTES
WALL MOUNTED FIRE
EXTINGUISHER
SEMI RECESSED FIRE
EXTINGUISHER
ILLUMINATED
FACE(S)
EMERGENCY
LIGHTS
ARROW(S). SHADED AREA INDICATES
EXIT LIGHT-WITH DIRECTIONAL
FE
FE
FLOOR
DRAINFD
KEYNOTES
SHEET NOTES
EXIT TO
GRADE
WH
HOSE
BIBB
WATER
METER
SAFETY
SHOWER
WALL
HYDRANT
HB
WH
WM
SS
ACCESSIBLE
ROUTE
MANHOLE
CATCH
BASIN
POWER
POLE
LIGHT
POLE
FIRE
HYDRANT
INLET
PROTECTION
CHANNEL
PROTECTION
TRACKING
PROTECTION
C.B.
P.P.
M.H.
L.P.
F.H.
HANDICAP
ELEVATION
MARKER
PLAN NORTH
SPOT
ELEVATION
RECESSED SLAB
CONDITION
101'-10"
LOW
SIDE
T.O.F. ELEV =
614'-0"T.O.F. ELEV =
614'-0"
PLAN
NORTH
CEILING HEIGHT
INDICATOR
COLUMN REFERENCE
GRID
REVISION
INDICATOR
KEYNOTE
INDICATOR
EQUIPMENT
NUMBER
PARTITION TYPE
INDICATOR
A
2 3
4
X
X
X
ARCHITECTURAL MATERIAL INDICATIONS
CIVIL SYMBOLS
NEW GRADE
ELEVATION
EXISTING GRADE
ELEVATION
GRASS
100.00
100.00
CIVIL INDICATIONS
W
100
100
WATER
MAIN
EXISTING
CONTOUR
NEW
CONTOUR
DATUM
PARTITION INDICATIONS
INSULATION
WOOD
METAL
BATT/LOOSE
FILL
WOOD STUD
FINISH
STEEL
WALL DEFINITIONS
EARTHWORKS
CONCRETE
MASONRY
/PRECAST
EXISTING
CONSTRUCTION
CONCRETE
BLOCK
COMPACTED
FILL
CAST-IN-PLACE
SWAMP
MISC.
DIRECTION OF
PITCHWITH % OF
SLOPE
UNIFORM
PITCH
DOWNSPOUT
HIGH
POINT
CLEANOUT FLUSH WITH
GRADE
SWALE LINE W/ DIR. OF
FLOW
U.P.
D.S.
C.O.
H.P.
2.0%
GLASS
WOOD STUD
(DETAIL)
RIGID
ALUMINUM
ROUGH
METAL
STUD
(DETAIL)
PLYWOOD
/BRONZE
BRASS
SPECIFIC DETAILS ARE SHOWN ON DETAIL
ROOM
IDENTIFIER
NOMINAL SIZE OR
S.F.
DOOR
INDICATOR
ARCHITECTURAL SYMBOLS
MATCH LINE
INDICATOR
101
MATCH
LINESEE
XX/X-XXX
SHEET AS FOLLOWS:
NAME NUMBER
DETAIL
NUMBER
DETAIL SHEET
NUMBER
DETAIL SHEET
NUMBER
DETAILS OF SPECIFIC ITEMS ON PLANS, ETC. ARE
DETAIL INDICATOR FOR SMALL CONDITIONS ARE
SHOWN AS FOLLOWS:
1
A2
DETAIL
NUMBER
SHOWN AS FOLLOWS:
ELEVATION
SHEET
NEW
CONSTRUCTION
BRICK
GROUT
UNDISTURBED
EARTH
STONE
DEMOLITION
DRAINAGE
FILL
ETC. ARE SHOWN AS FOLLOWS:
BUILDING SECTIONS CUT ON PLANS,
ETC. ARE SHOWN AS FOLLOWS:
PARTIAL SECTIONS CUT ON PLANS,
INTERIOR ELEVATIONS SHOWN AS FOLLOWS:
SECTIONS AND DETAILS
ELEVATION
NUMBER
SECTION
LETTER
SECTION
SHEET
HORIZ horizontal
INSUL insulate(d), insulation
LAV lavatory
LF linear foot
LL live load
INT interior
JST joist
JT joint
INCL include(d), including
HVAC heating/ventilating/air conditioning
IE invert elevation
ID inside diameter
IN inch
HTG heating
HW hot water
HYD hydrant
square/square foot
LP plate
angle
diameter
centerlineLC
I#
oI
GA gauge
GC general contract(or)
HM hollow metal
HDWR hardware
HC hollow core
HGT height
HB hose bib
GL glass, glazing
GALV galvanized
GYP gypsum
GB grab bar
FNDTN foundation
FTG footing, fitting
G gas
FT foot
FLUR fluorescent
FE fire extinguisher
FD floor drain
FLR floor
FIN finish
DR door, drain
ELEC electric(al)
FAC fire access cabinet
EXP exposed, expansion
EWC electric water cooler
EPI extruded polystyrene insulation
EPDM ethylene, propylene, diene terpolymer
EXIST existing
EXT exterior
EXH exhaust
EQUIP equipment
EW each way
ELEV elevator
EIFS exterior finish insulation system
DWG drawing
EL elevation
EA each
DWALL drywall
DW dishwasher
DS down spout
DTL detail
CONTR contract(or)
DIM dimension
DF drinking fountain
DIA diameter
DBL double
DN down
CY cubic yard
CT ceramic tile
CR curb ramp
CPT carpet(ed)
CONT continue, continuous
CMU concrete masonry unit
CONC concrete
COL column
CO cleanout
CJ construction joint
CF cubic feet
CLK caulk(ing)
CLJ control joint
CLG ceiling
STANDARD ABBREVIATIONS
AP access panel
BM beam, bench mark
BS both sides
BTM bottom
BRG bearing
BO by others
BLKG blocking
BLDG building
ASPH asphalt
BD board
AFF above finished floor
AB anchor bolt
ALUM aluminum
A/C air conditioning
ALT alternate
1/4" =
1'-0"
8'2' 4'0
3'-1 1/4"3'-8 11/16" 3'-0"
40" max.
17" min. depth
34" max.
29" min.
6" max.
27" min
1'-10 5/16" STANDARD
1'-10 3/8"
6'-0 5/8" (MIN.)
8" min.
9" min.
12" MAX.
18"
MIN.
3'-5" STANDARD
3'-1 1/4"
7"-9"
3'-3 1/8" MIN.
15" MIN.
60" MIN.
X
24"
MIN.
48" MIN. *
Y
5'-9 13/16"
4'-6"
11 3/16"
6'-6" (MEN)
1'-10 3/8"
1'-4 3/4"
3'-3 1/8"
2'-7 11/16"
3'-1 1/4"
3'-1 1/4" MAX.
5 3/4"
17"-19"
X
NOTE: X = 12" MIN. IF DOOR HAS BOTH A LATCH
& CLOSER
56" min.
24" MIN.
36" PREF.
60" min.
16"-18"
42" min.
30" min.
48" min.
19" max.
3'-1 1/4"
17" min.
48" MIN.
54" MIN.
42" MIN. *
24"
MIN.
42" MIN. *
2'-0 3/16"
SCREEN WALLS
29" (735 mm)
2'-2 1/16"
1 1/2"
1 1/4"-1 1/2"
5'-8 7/8"
5'-5 3/16"
NOTES APPLY TO ENTIRE DOCUMENT SET.
NOTES APPLY ONLY WHERE INDICATED BY SYMBOL.
NOTES APPLY ONLY TO SHEET.
MANUF manufactured
MAX maximum
MB mop basin
MECH mechanical
MEMB membrane
MFR manufacturer
MIN minimum
MISC miscellaneous
MO masonry opening
MTL metal
NIC not in contract
NO number
NOM nominal
NTS not to scale
OC on center
OD outside diameter
OH overhead, overhang
OPNG opening
PART partition
PCF pounds per cubic foot
PKT pocket
PLAS plastic
PLBG plumbing
PLF pounds per lineal foot
PNL panel
POLY polyethylene
PROJ project, projected
PROP property
PSF pounds per square foot
PSI pounds per square inch
PT pressure treated
PTD paint(ed)
PVC polyvinyl chloride
PVMT pavement
PWD plywood
QT quarry tile
R radius, riser
RA return air
RD roof drain
REF refrigerator
REINF reinforcing
REQD required
REV revise, revision
RM room
RO rough opening
SA supply air
SC solid core
SF square foot
SH shelf, shelving, shower
SHT sheet
SIM similar
SPKR speaker
SQ square
SS stainless steel
STC sound transmission coefficient
STD standard
STL steel
SUSP suspended
SY square yard
T tread
TELE telephone
T/G tongue and groove
THK thick(ness)
TOF top of footing
TOS top of steel
TOW top of wall
TYP typical
UH unit heater
VB vapor barrier
VCT vinyl composition tile
VERT vertical
VT vinyl tile
W water
W/ with
WD wood
W/O without
WP waterproof(ing)
WSCT wainscot
WWF welded wire fabric
FLOOR PLAN
MOUNTING HEIGHTS & CLEARANCES
M
715-572-2698
inquiry_arccentral@outlook.com
ARC CENTRAL LLC
PROJECT NO.
DATE
REVISIONS
© Arc Central LLC 2025
ARCHITECTURE, CONSTRUCTIONMANAGEMENT, INTERIOR DESIGN
PROPOSED PLANS
FOR
COPYRIGHT © Arc Central LLC 2025 All Rights Reserved
ALL DRAWINGS ARE TO THE SCALE SHOWN ON THE SHEETS. THEY ARE INTENDED TO BE PRINTED ON 24x36" SHEETS. IF THEY ARE
PRINTED ON A DIFFERENT SIZE SHEET THE SCALE NEEDS TO BE ADJUSTED ACCORDINGLY. G102
25109
August 21, 2025
0 Third Street, Stevens Point,
Wisconsin 54481
SYMBOLS AND LEGENDSTHIRD STREET CONDOMINIUMS
Prelim. Plan 7.14.25
Const. Docs Date
Approval Date
Revision 1 Date
Revision 2 Date
Page 25 of 61
Page 110 of 116
60" (1525 mm) MIN.
SWING--OPPOSITE DIRECTION
Notes
1. Hardware: Specify hardware that can be operated with one hand, without tight
grasping, pinching, or twisting of the wrist.
2. Thresholds: Thresholds are typically limited to 1/2 in. maximum height;
however, some standards allow a 3/4 in. height for certain sliding doors.
3. Opening force: Interior doors (other than fire doors) should be able to be
operated with 5 lb of force. Exterior doors and fire doors may be regulated
by the authority having jursidiction.
WITHIN 43" OF FLOOR
SHOULD EXTEND TO
LEAST ONE PANEL
ARE PROVIDED, AT
WHERE VISION LIGHTS
(865 AND 1220 mm)
LOCATED BETWEEN
DOOR HARDWARE
SHOULD BE SMOOTH
OF DOOR SURFACE
BOTTOM 10" (255 mm)
60" (1525 mm) MIN.
HANDRAIL
PROTECTION
PROVIDES EDGE
ENCLOSED RAMP
CLEAR WIDTH
36" (915 mm) MIN.
X = RAMP LENGTH (HORIZONTAL PROJECTION OR RUN)
MIN.
PARALLEL APPROACH--ALCOVE
48" (1220 mm) MIN.
60" (1525 mm) MIN.
32" (815 mm)
36" (915 mm)
MIN.
MIN.
SINGLE WHEELCHAIR
24" (610 mm)
MIN.
TWO WHEELCHAIRS
36" (915 mm)
32" (815 mm)
MIN.
MIN.
MIN.
24" (610 mm)
ONE WHEELCHAIR AND
48" (1220 mm) MIN.
ONE AMBULATORY
PERSON
PARALLEL
ACCESSABLE DOORS
43" (1090 mm)
34"
48"
MAX.
MIN.
CLOSER
DOOR
MAX.
ABOVE FLOOR
34" AND 48"
36" (915 mm)
FORWARD APPROACH--ALCOVE
30" (760 mm)
30" (760 mm)
21" (535 mm)
48" (1220 mm) MAX.
15" (380 mm) MIN.
48" (1220 mm) MIN.30" (760 mm) MIN.
(380 mm)
X > 15"
MIN.
SHELVES
X > 24"
(610 mm)
MAX.
ACCESSIBLE RANGE
48" (1220 mm) MAX.
CLOSET
21" (535 mm)
MAX.
10" (255 mm) MAX.
32" TO 42" PREFERRED
54" (1370 mm) MAX.
9" (230 mm) MIN.
24" (610 mm)
46" (1170 mm)
34" (865 mm) MAX.
MAX. SIDE REACH OVER OBSTRUCTION
HIGH AND LOW SIDE REACH LIMITS
17" (430 mm) MIN.
6" (150 mm)11" (280 mm)
OVER 10" (1:20 SLOPE)
1/2" RISE, MAX.
34" TO 38" (865 TO 965 mm)
EXTENDED PLATFORM
10" (255 mm) MIN.
(255 mm TO 610 mm)
10" TO 24"20" TO 25"
(510 TO 635 mm)
48" (1220 mm)
30" (760 mm)
48" (1220 mm) MIN.
30" (760 mm) MIN.
FORWARD
MIN.
OBSTRUCTED HIGH FORWARD REACH
ALCOVE
SPACE
FLOOR
CLEAR
30" X 48"
MAX.
OBSTRUCTED SIDE REACH
MAX.
44" (1120 mm) MAX. 48" (1220 mm) MAX.
20" (510 mm)
MAX.
46" (1170 mm) MAX.
34" (865 mm) MAX.
48" (1220 mm) MAX.
10" (255 mm)
34" (865 mm) MAX.
MAX.
6" (150 mm) MAX.
TOE CLEARANCE ONLY
9" (230 mm)
48" (1220 mm)
SWING--SAME DIRECTION
DIRECTION
OF TRAVEL
MIN.
27" (685 mm) MIN.
9" (230 mm)
specific accessible elements.
Clearances shown are required at
WHEELCHAIR TURNING SPACE
OF MANEUVERING CLEARANCE OR
THIS AREA MAY BE USED AS PART
MINIMUM CLEARANCE
NOTE
TOE CLEARANCE
8" (205 mm)
MIN.
MIN.
CLEARANCE
CLEARANCE
TOE
KNEE
MIN.
(865 TO 965 mm)
34" TO 38"
Slope = Y:X, where X is a level plane.
NOTE
Y = RAMP
LANDING
RISE
RAMP SURFACE
HORIZONTAL EXTENSION
12" (305 mm) MIN.
RAMP
RAMP
RAILING
RAMP
ANYCLEARANY
80" (2030 mm) MIN.
27" (685 mm)48" (1220 mm) MAX.
UNOBSTRUCTED FORWARD REACH
15" (380 mm)
MIN.
TO A WALL
WALKING PARALLEL
(685 mm)
HIGHER THAN 27"
OR LESS
48" (1220 mm) MAX.
UNOBSTRUCTED SIDE REACH
DISABILITY,
PERSON WITH
TYP.
MIN.
15" (380 mm)
FOR ADAAG
* 54" (1370 mm) MAX.
27" (685 mm)
TO A WALL
WALKING PERPENDICULAR
OR LESS
WALKING PARALLEL
TO A WALL
RANGE
CANE
AMOUNT
MAX.
4" (100 mm)
WIDTH AMOUNT
MAX.
1/2" (13 mm)
9" (230 mm)
27" (685 mm) MIN.
is not considered knee and toe clearance.
table, desk, or other element, but that space
Additional space can be provided beneath the
WHEELCHAIR TURNING SPACE
OF MANEUVERING CLEARANCE OR
THIS AREA MAY BE USED AS PART
MAXIMUM CLEARANCE
NOTE
CLEARANCE
TOE AND KNEE
CLEARANCE
TOE AND KNEE
25" (635 mm) MAX.
KNEE
CLEARANCE
CLEARANCE
TOE
turning space, and access aisles.
maneuvering clearances, wheelchair
in level in clear floor space,
2. Some standards prohibit changes
1/2 in. (13 mm) must be ramped.
1. Changes in level greater than
36" (915 mm) MIN.
BALUSTER
HANDRAIL
CLEAR WIDTH
2
ALLOWED
(6.5 TO 13 mm)
1/4" TO 1/2"
NOTES
MAX.
1
1/4" (6.5 mm)
NOT ALLOWED
ALLOWED
MAX.
RAMP RUN
RAMP RISE
RAMP
WHEELCHAIR TURNING SPACE
OF MANEUVERING CLEARANCE OR
THIS AREA MAY BE USED AS PART
1 1/2"1 1/4" TO 2"
29"
NONCIRCULAR
2 1/4"
1 1/2"
2 1/4"
2 1/4"
2 1/2"
ANSI MIN.
MAX.
MAX.
MAX.
PROJECTION
HORIZONTAL
PERIMETER
4" TO 6 1/4"
MAX.
CIRCULAR
2 1/2" ANSI MIN.
MIN.
PROJECTION
HORIZONTAL
48"
40"
27"
34"
17" TO 25"
9"
MIN.
MAX.
MAX.
MAX.
30"
MIN.
17"
3'-8"
REMOVABLE
LAVATORY
TOP OF
BOTTOM
MIRROR
MIN.
REFLECTIVE
PART OF
2'-3"
PERPENDICULAR
APPROACH
PARALLEL
APPROACH
SEAT
25"
SPACE
FLOOR
CLEAR
MAX.
4'-6 7/16"
9 1__
16"
34" TO 38" (865 TO 965 mm)
MIN.
OF TRAVEL
DIRECTION
1:20 IS NOT<(SLOPE
LANDING
ARE REQUIRED)
SO NO HANDRAILS
DEFINED AS A RAMP
LANDING
12" (305 mm) MIN.
1:20 SLOPE
1:12 TO
HORIZONTAL
PROJECTION
4'-7"
3'-8"
1'-0"
2'-9"
2'-9"
3'-6"
2'-0"4'-0"
12"
8"
2'-9" TO 2'-9"
MOUNT
CONTROLS
IN THIS
AREA ONLY
3'-6" MIN.
18"
1'-10"
15"
SEAT
FOLDING
SHOWER
SHOWER
HEAD
FIXED
18"
3'-7" ± 5"
CONTROL AREA
2'-6" TO 3'-0"
GRAB BAR
1 1/2" (38 mm)
DIAMETER
HANDHELD
SHOWER
HEAD
6"MIRROR
URINAL PARTITION
URINAL (ELONGATED TYPE)
TOILET PARTITION
2'-9"3'-0 5__
16" MAX.
1'-5" MIN.
8"
60" (1525 mm) MIN.
60" (1525 mm) MIN.
MIN. REQUIRED LANDING WIDTH
mm)
(255
RAMP
AS RAMP RUN
AT LEAST AS WIDE
RAMP
X
LANDING
Y
LANDING
SURFACE
TO REFLECTING
LANDING LENGTH
3'-0" MIN.
5" MAX.
1'-0"
3'-6"
CLEAR
11_
2"
3'-4"
1'-3"
2'-3"
2'-10"
2'-6"
5"
MAX.
2"
1 1/2"
LC
1'-6"
2'-10"
1'-7" MIN.
BOWL AND PIPES MUST BE
CONTAINED WITHIN THIS AREA
5'-0" clear
SPACE 2'-6" X 4'-0"
CLEAR FLOOR
3'-0" MAX.
LC
5'-0" x 5'-0"
CLEAR FLOOR SPACE
AT ACCESSIBLE STALL
3'-6"
1'-6"
VERTICAL GRAB BAR
HORIZ. GRAB BAR
CTR OF TOILET
KNEE/TOE CLEARANCE
MIN.
3'-4"VERT. BAR
MANUEVERING CLEARANCES, REACH RANGES, & PROTRUDING OBJECTS RAMPS & DOORS MOUNTING HEIGHTS & CLEARANCES
715-572-2698
inquiry_arccentral@outlook.com
ARC CENTRAL LLC
PROJECT NO.
DATE
REVISIONS
© Arc Central LLC 2025
ARCHITECTURE, CONSTRUCTIONMANAGEMENT, INTERIOR DESIGN
PROPOSED PLANS
FOR
COPYRIGHT © Arc Central LLC 2025 All Rights Reserved
ALL DRAWINGS ARE TO THE SCALE SHOWN ON THE SHEETS. THEY ARE INTENDED TO BE PRINTED ON 24x36" SHEETS. IF THEY ARE
PRINTED ON A DIFFERENT SIZE SHEET THE SCALE NEEDS TO BE ADJUSTED ACCORDINGLY. G103
25109
August 21, 2025
0 Third Street, Stevens Point,
Wisconsin 54481
ACCESSIBILITY DETAILSTHIRD STREET CONDOMINIUMS
Prelim. Plan 7.14.25
Const. Docs Date
Approval Date
Revision 1 Date
Revision 2 Date
Page 26 of 61
Page 111 of 116
RAMP, STREET OR PARKING
SLOPE GUTTER FROM
LEVEL WITH
SLOPE
1:12 MAX.
TYPE A
PAVEMENT
SLOPE
SLOPE
1:50 MAX.
6" CURB MAX.
SLOPE CURB
WITH RAMP
1:12 MAX.
CURB LEVEL WITH
GROUND COVER
VISUAL IMPAIRMENTS
FOR PERSONS WITH
DETECTABLE WARNING
TYPE B
SLOPE
1:12 MAX.
GROUND COVER
CURB LEVEL WITH
SLOPE
SLOPE CURB
WITH RAMP
1:12 MAX.
GROUND COVER
CURB LEVEL WITH
1:50 MAX.
SLOPE
TYPE C
TYPE D
ROADWAY
WITH
LEVEL
TYPE E
IMPAIRMENT
VISUAL
PERSONS WITH
WARNING FOR
DETECTABLE
CROSS SLOPE
SLOPE
1:12 MAX.
SLOPE
1:50 MAX.
1:10 MAX.
RAMP
CURB
FROM
GUTTER
SLOPE
CROSS SLOPE
1:50 MAX.
SLOPE
1:10 MAX.
1:12 MAX.
SLOPE
TYPE F
SLOPE
1:50 MAX.
TYPE G
GROUND COVER
CURB LEVEL WITH
WITH RAMP
SLOPE CURB
1:12 MAX.
SLOPE
NOTE
If the 4 ft 0 in. preferred dimension cannot be met for type
F, the 1:10 slope becomes 1:12 maximum.
ACCESSIBLE ROUTE
SIGN
BUMPER
S S S S SV
HATCHING
INTERNATIONAL SYMBOL
IN PAVEMENT (OPTIONAL)
SIGN (VAN-ACCESSIBLE
PARKING)
SV
SVSV
CURB
SIDEWALK
SV SV
SIDEWALK
CURB
CURB RAMP
LANDSCAPING
CURB
SIDEWALK
SLOPE OF
FLARES 1:10
SV S
WALL
18'-0" MIN.
19'-0" PREF.
19'-0" PREF.
18'-0" MIN.
19'-0" PREF.
18'-0" MIN.
2'-6" MIN.
1'-6" MIN.2'-0"PREFERRED
8'-0" MIN. 9'-0"
PREFERRED TYP.
5'-0" TYP.
SLOPE 1:12SLOPE 1:12
SLOPE 1:12
SLOPE 1:12
8'-0"
8'-0" MIN. 9'-0"
PREFERRED TYP.
FOR 6" CURB
AND 1/4":1'-0"
CROSS-SLOPE
8'-0" MIN.
9'-0" PREF. TYP.
8'-0" MIN. 9'-0"
PREFERRED TYP.
2'-6"
2'-6" MIN.
2'-6"
2'-6"
4'-0" MIN.
2'-6"
3'-0" MIN.
2'-0" PREFERRED
3'-8 1
2" TYP.
3'-0" MIN.
2'-0" OVRHNG
3' MIN.
8'-0"
8'-0"
3'-0"
3'-0"
3'-0" MIN.
2'-0" OVERHANG
8'-0"
3'-0" MIN.
2'-0" OVRHNG
3'-0" TYP.
5'-0"
2'-0" OVRHNG
3'-0" MIN.
1'-0"
1'-6"
1'-0"
1'-6"
MANUEVERING CLEARANCES, REACH RANGES, & PROTRUDING OBJECTS ACCESSIBLE SIDEWALK RAMPS
715-572-2698
inquiry_arccentral@outlook.com
ARC CENTRAL LLC
PROJECT NO.
DATE
REVISIONS
© Arc Central LLC 2025
ARCHITECTURE, CONSTRUCTIONMANAGEMENT, INTERIOR DESIGN
PROPOSED PLANS
FOR
COPYRIGHT © Arc Central LLC 2025 All Rights Reserved
ALL DRAWINGS ARE TO THE SCALE SHOWN ON THE SHEETS. THEY ARE INTENDED TO BE PRINTED ON 24x36" SHEETS. IF THEY ARE
PRINTED ON A DIFFERENT SIZE SHEET THE SCALE NEEDS TO BE ADJUSTED ACCORDINGLY. G104
25109
August 21, 2025
0 Third Street, Stevens Point,
Wisconsin 54481
ACCESSIBLE PARKING AND
SIDEWALK DETAILSTHIRD STREET CONDOMINIUMS
Prelim. Plan 7.14.25
Const. Docs Date
Approval Date
Revision 1 Date
Revision 2 Date
Page 27 of 61
Page 112 of 116
BUILDING 1
15'-8 1/4" 17'-9"
48'-11"
T H I R D S T R E E T
FENCE TO SEPARATE WALK-OUT PATIO AREAS
UNIT 104
UNIT 101
UNIT 103
UNIT 102
UNIT 105
UNIT 106
IN
OUT
SNOW STORAGE SNOW STORAGE
STORMWATER RETENTION SWALE STORMWATER
RETENTION SWALE
10'-0"
DIM TO FOUNDATION
25'-9"
EXISTING ALLEY
EXISTING ALLEY
ROOF OVERHANG AT ENTRY
EXISTING CITY SIDEWALK
MULCHED LANDSCAPE
BEDS @ BLDG PERIMETER
TYPICAL
RED MAPLE
OAK LEAF
HYDRANGEAS
1" = 10'-0"1 1LANDSCAPE PLANLANDSCAPE PLAN
715-572-2698
inquiry_arccentral@outlook.com
ARC CENTRAL LLC
PROJECT NO.
DATE
REVISIONS
© Arc Central LLC 2025
ARCHITECTURE, CONSTRUCTIONMANAGEMENT, INTERIOR DESIGN
PROPOSED PLANS
FOR
COPYRIGHT © Arc Central LLC 2025 All Rights Reserved
ALL DRAWINGS ARE TO THE SCALE SHOWN ON THE SHEETS. THEY ARE INTENDED TO BE PRINTED ON 24x36" SHEETS. IF THEY ARE
PRINTED ON A DIFFERENT SIZE SHEET THE SCALE NEEDS TO BE ADJUSTED ACCORDINGLY. C100
25109
August 21, 2025
0 Third Street, Stevens Point,
Wisconsin 54481
LANDSCAPE & UTILITIES
SITE PLANTHIRD STREET CONDOMINIUMS
Prelim. Plan 7.14.25
Const. Docs 5.11.26
Approval Date
Revision 1 6.24.26
Revision 2 Date
0' 20'0' 5' 10'
N
PORTAGE STREET
2 2UTILITIES UTILITIES
Page 113 of 116
City of Stevens Point
1515 Strongs Avenue
Stevens Point, WI 54481-3594
Department of Community Development
Adam Kuhn
Associate Planner
Zoning Administrator
Ph: (715) 346-1567
Fax: (715) 346-1498
www.stevenspoint.com
Open Records Rider: The City of Stevens Point is subject to Wisconsin Statutes relating to public records.
Communication, such as this document, sent or received by City employees are subject to these laws. Unless
otherwise exempted from the public records law, senders and receivers of City communication should
presume that the communications are subject to rel ease upon request, and to state record retention
requirements.
Page 1 of 1
MEMORANDUM
To: Plan Commission
From: Adam Kuhn, AICP
Associate Planner / Zoning Administrator
Date: September 8, 2026
RE: Zoning Ordinance Amendment – Turnaround Specifications
-------------------
Background: The City’s Zoning Ordinance has numerous provisions pertaining to the
design of residential driveways. One such provision is the specifications for turnaround
areas that serve a residential driveway abutting an arterial street. Turnaround areas are
permitted to be constructed at a size not to exceed 8’ x 10’ and must not be located in
front of the residence.
Ch. 23.01(17)(i)(3)(a)(iv)
On arterial streets only, a turnaround area (8 feet by 10 feet, 80 square
feet maximum) may be located in a front yard, but not in front of the
primary dwellings. The turnaround area must be contiguous to the
driveway.
As part of the Business 51 Reconstruction Project, City staff have been engaging with
multiple residential property owners along the corridor regarding apron work to their
driveways. With access points being adjusted as part of the project to achieve
conformity, City staff are requesting to increase maximum size allowances for
turnarounds from 80 square feet to 120 square feet. Having a larger turnaround area
better enables motorists to not back out on an arterial street – reducing potential traffic
conflicts along the city’s major thoroughfares.
Staff Recommendation: APPROVE the ordinance amendment as presented.
Page 114 of 116
ORDINANCE AMENDING THE REVISED MUNICIPAL CODE
OF THE CITY OF STEVENS POINT, WISCONSIN
[Chapter 23 of the Revised Municipal Code – Zoning Ordinance – Maximum Turnaround
Area for Residential Driveways Abutting an Arterial Street]
The Common Council of the City of Stevens Point, Portage County, Wisconsin, do
ordain as follows:
SECTION I: That Section 23.01(17)(i)(3)(a)(iv), Zoning Ordinance of the Revised Municipal
Code of the City of Stevens Point, shall be amended as follows:
On arterial streets only, a turnaround area (8 feet by 10 feet 10 feet by 12
feet, 80 120 square feet maximum) may be located in a front yard, but not
in front of the primary dwellings. The turnaround area must be contiguous
to the driveway.
SECTION II: That this ordinance shall take effect upon passage and publication.
Approved: ________________________________
Mike Wiza, Mayor
Attest: ________________________________
Susan Pagel, City Clerk
Dated: September 8, 2026
Adopted:
Drafted by: Adam Kuhn
Return to: City Clerk
Page 115 of 116
Community Development Report, July 2026
Abandoned Vehicle on Property 5
1 230 Evelyn Ct $1,163.00 Bulk Waste at Curb Early 15
1 222 Evelyn Ct $1,319.00 Commercial Building Violation 0
1 214 Evelyn Ct $1,420.52 Construction Work Without Permits 0
1 5550 Forest Creek Rd $1,491.00 Debris on Property 5
1 5566 Forest Creek Rd $1,451.48 Exterior Violations on House 4
1 5498 Golla Rd $1,393.00 Illegal Pets or Livestock 1
Two‐Family 1 3265/3267 Echo Dells Ave $1,515.00 Infestation 1
Multi‐Family N/A N/A N/A Interior Housing Violations 0
NEW CITY HALL (BLD/ZN) Native Lawn Plan 0 ++
NEW CITY HALL (PLB) Potholes 0 +
NEW CITY HALL (SITE PLB) Property Encumbrance 0
1039 Ellis St Public Works Violation 7 +
MIDSTATE INDEPENDENT LIVING STORAGE BLDG (BLD/ZN) Snow & Ice Removal ‐ Sidewalk 0
1101 Brilowski Rd Tall Grass or Noxious Weeds 13
Trash Containers Improperly Stored 2
Vacant Building/Home 0
Vehicle Parked on Grass 8
Residential 116 $8,893.00 Vision Obstruction in Roadway or Intersection 0
Commercial 31 $7,697.73 Zoning Violations 0
Total Violations / Total Service Fees Billed 61 $3,475
Monthly Permits Monthly Valuation Monthly Fees YTD Permits YTD Valuation YTD Fees Voluntary Compliance Rate for Tagged/Verbal 0/0 0%
158 $14,060,458.50 $27,318.73 867 $232,362,758.30 $1,155,213.38 + Referred to another department
++ Perpetual
2025 829 $40,343,617.85 $143,551.71
2024 839 $54,579,076.77 $201,031.20
2023 921 $55,323,916.53 $234,774.01
Commercial/Industrial
3
$975.00
$25,000.00
$270,200.00
$316,120.00
N/A
$269,499.75
$9,264,255.00
$348,345.00 $0.00
Additions or Alterations # of Permits
$1,379,111.33
$1,221,007.22
Declared Valuation Fees
1 $4,034.20
Violation ReportConstruction Report
New Construction Fees# of Permits Location Declared Valuation
Single Family
$306,111.00
$213,275.00
$220,000.00
$223,500.00
Page 116 of 116
Source: City of Stevens Point website. First collected Oct 1, 2026.