RecordWell Data

Business Park Business Improvement District Board — Agenda Packet

City of Stevens Point · Portage County · Business Improvement District Board · meeting of Aug 19, 2026 · Agenda packets

Open the original document More from City of Stevens Point

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Our intention is to have in-person meetings going forward. The Business Park Business Improvement District Board meeting will be held at the Stevens Point Transit Center located at 2700 Week Street. This in- person location will meet the legal requirement for our open meetings. AGENDA BUSINESS PARK BUSINESS IMPROVEMENT DISTRICT BOARD MEETING Members • Alderperson Donahue • Heidi Charlesworth • Erik Carlson • Jeff Ramlow • Mike Trzinski • Debra Marten • Chase Rettler Date and Time: August 19, 2026 11:00 AM Location: Conference Room Stevens Point Transit Center 2700 Week Street Stevens Point WI 54481 Opening Section: 1. Roll Call. 2. General Reports and Updates A. City Staff Updates B. Board Chair Report C. Treasurer Report D. Executive Director Report Discussion and Possible Action on: 1. Approve Meeting Minutes from July 15, 2026. 2. Approval of quotes for maintenance and administrative items: A. Discussion and possible approval to share in the cost (35%) for BID's Locable software program. B. Discussion and possible action on quote from Arrow Precision Asphalt Maintenance LLC for trail maintenance. C. Discussion and possible action on Roberts Irrigation quote to repair cut lines for fountain #1 & 2. D. Discussion and possible action on quote received to replace bridge boards on trail. Page 1 of 49 3. Discussion and possible action on Name and Logo selection presented by Avia. 4. Discussion and possible action on DRPC changes as recommended by work group. 5. Adjournment PLEASE TAKE NOTICE that any person who has special needs while attending these meetings or needs agenda materials for these meetings should contact the City Clerk as soon as possible to ensure that a reasonable accommodation can be made. The City Clerk can be reached by telephone at (715) 346-1569 or by mail at 1515 Strongs Avenue, Stevens Point, WI 54481. Maps further defining the above area(s) may be obtained from the City of Stevens Point Business Improvement District Executive Director, Karen Margelofsky, 1105 Main Street Suite A, Stevens Point, WI 54481, or by calling (715) 496-0823, during normal business hours. PLEASE TAKE FURTHER NOTICE that a quorum of the Common Council may be in attendance at this meeting. Page 2 of 49 CITY OF STEVENS POINT BUSINESS PARK BID REPORT JULY 2026 Page: 1 Period: 07/26 Aug 03, 2026 08:19AM 2026 2026 2026 Current year Current year Current month Account Number Account Title Budget Actual Actual BUSINESS PARK BID 256.11100 GENERAL OPERATING CASH .00 129,528 26,445- TAXES 256.41.00120.56 BID ASSESSMENTS 230,307 230,307 .00 Total TAXES: 230,307 230,307 .00 OTHER FINANCING SOURCES 256.49.19310.59 GENERAL FUND BALANCE USAGE .00 .00 .00 Total OTHER FINANCING SOURCES: .00 .00 .00 CPA/AUDITING SERVICES 256.51.19960.2004 AUDIT SERVICES 6,300 3,400 .00 Total CPA/AUDITING SERVICES: 6,300 3,400 .00 BUSINESS IMPROV DISTRICT 256.56.00700.1154 DOWNTOWN MANAGER SALARY 23,800 13,731 1,831 256.56.00700.1900 EMPLOYER CONTRIB/WISC RET 1,714 989 132 256.56.00700.1910 EMPLOYER CONTRIB/S.S. TAX 1,821 891 118 256.56.00700.1920 EMPLOYER CONTRIB/LIFE INSUR 8 18 3 256.56.00700.1930 WORKERS COMPENSATION PREM 426 246 33 256.56.00700.1950 MEDICAL INSURANCE PREM 6,622 5,341 804 256.56.00700.1955 HSA CONTRIBUTION 420 .00 .00 256.56.00700.2200 GAS/ELECTRIC CHARGES 13,000 11,034 3,857 256.56.00700.2203 TELEPHONE UTILITY CHARGES .00 .00 .00 256.56.00700.2204 WATER/SEWER UTIL CHARGES 2,600 1,874 1,079 256.56.00700.2205 PROPERTY TAXES .00 7,442 .00 256.56.00700.2800 COMPUTER/COMPUTER EQUIP .00 .00 .00 256.56.00700.3001 GENERAL OFFICE SUPPLIES 596 175 175 256.56.00700.5000 MISCELLANEOUS CHARGES 12,000 4,140 3,792 256.56.00700.5751 LAWN CARE/SNOW REMOVAL EXP 75,000 47,581 10,780 256.56.00700.5752 LANDSCAPING EXPENSES .00 .00 .00 256.56.00700.5753 POND MAINTENANCE 10,000 10,284 3,842 256.56.00700.5754 PRIVATE UTILITY LOCATES 2,000 .00 .00 256.56.00700.5755 FOUNTAIN REPLACEMENTS 28,000 12,461 .00 256.56.00700.5756 TRAIL MAINTENANCE 20,000 .00 .00 256.56.00700.5757 BRANDING STUDY 26,000 3,200 .00 Total BUSINESS IMPROV DISTRICT: 224,007 119,407 26,445 BUSINESS PARK BID Revenue Total: 230,307 230,307 .00 BUSINESS PARK BID Expenditure Total: 230,307 122,807 26,445 Net Total BUSINESS PARK BID: .00 107,500 26,445- Page 3 of 49 Stevens Point Business Park Business Improvement District Board Meeting Minutes June 15th, 2026, at 11am at the Transit Center Conference Room Opening Section: 1. Roll call a. Heidi Charlesworth - Present b. Alderperson Donahue - Present c. Eric Carlson - Excused d. Jeff Ramlow - Present e. Mike Trizinski - Present f. Debra Marten - Present g. Chase Rettler - Present h. Karen Margelofski - Present i. Jarod Kivela – Present j. Portage Planning and Zoning – Guest - Present General reports and updates 1. City staff Updates a. Mid State/Fire Department Tech College update i. Initial approvals from City – Fall final City Review ii. Funding started iii. Business support b. Other interests from business c. Rail design – 2nd design d. Deed Restriction and still working on updates 2. Report from the Executive Director a. Property to the center park – Opportunity to sell i. Some companies are interested – Work w/Board 1. Quotes – Maintenance (asked for) ii. By Law look on opportunity to sell – Karen to check 1. City attorney – Go to Keith 2. Next month place on agenda b. Complaint on Camper – Karen followed up c. Use of the common areas – Karen followed up Page 4 of 49 d. Landscape/asphalt/wood on bridge – Quotes requested i. Pond 2 – Running ii. Pond 1 – Electrical was cut 1. Quote being asked 2. Line location opportunity – No GPS pinpoints on these lines 3. Activity of boring new lines – Board keep tabs on it e. Move of the board meeting to the 3rd Wed of the month @ 11am f. Branding was updated and get some updated draft designs to next meeting g. CCap – Run/Walk plan - Update 3. Board Chair Report a. Challenge/feedback on updates please bring to Mike/Karen b. Signs – Keep tabs where they are located and what will need to be replaced or added. c. Data base list still developing d. Annual meeting plan 4. Treasurer Report a. Thank you City for timely processing b. Budget is good – No callouts Discussion and Possible Action on: 1. Approved meeting minutes from June 17, 2026 Motioned Debra, 2nd Jeff 2. BID Asphalt/Walkways – Quotes in process a. Jay Lawncare – Quote 3. Motion to adjourn Motion Jeff, 2nd Chase Meeting adjourned at 11:32 Minutes respectfully submitted by Heidi Charlesworth - Secretary Page 5 of 49 Invoice Locable 929 Winchester Hwy, #103 Fayetteville, TN 37334 US Bill to Karen Margelofsky Stevens Point, Wisconsin Invoice numberINV-1492 Invoice dateAugust 5, 2026 Due dateAugust 5, 2026 Total $4,544.60 PRODUCTS & SERVICES QTY UNIT PRICE AMOUNT Nonprofit Content Marketing & Distribution Core - Annual Plan Annual subscription fee for the Coordinate level of the Content Marketing & Distribution Core, prepaid with an annual discount. August 5, 2026 – August 5, 2027 1 $1,188.00 $0.00 after 100% discount Community Engagement Core Onboarding & Account Setup Simply provide business and partner information via spreadsheet - we’ll provide a template.  Locable will complete account setup activities including setting up the calendar(s), directory(ies), and more. Includes training, our Community Engagement Packet filled with resources, and partner engagement support via our Community Activation Manager. This done-for-you service reduces setup time for many to around 30-minutes and we’ll show you how to man- age the process so you can make updates and addi- tions as needed in the future. 1 $750.00 $0.00 after 100% discount Administrative Efficiency Account Setup & Data Migration Simply provide business, vendor, and member informa- tion via spreadsheet - we’ll provide a template.  Account setup for the Administrative Efficiency Core in- 1 $750.00 $0.00 after 100% discount Pay for this invoice online Page 6 of 49 PRODUCTS & SERVICES QTY UNIT PRICE AMOUNT cludes configuration of membership types and statuses, billing settings; support for one-time and recurring pay- ments, donation options, vendor payment setup, and form setup. We’ll help you get the right foundations in place to streamline admin tasks and simplify future growth. This done-for-you service reduces setup time for many to around 30-minutes and we’ll show you how to man- age the process so you can make updates and addi- tions as needed in the future. Includes up to 250 Members. Content Marketing & Distribution Core Onboarding & Account Setup Locable will complete account setup activities including setup of your Content Marketing Microsite, Guided Blogging™ onboarding with hands-on training, Express Email Newsletter™ configuration, subscriber import (CSV or integration), and setup of your subscriber signup form. We’ll also help you prepare your first cam- paign or post so you can hit the ground running and we'll train your content creators as part of our new Content Marketing Training series. Simply provide your subscriber information via spread- sheet.  This done-for-you service reduces setup time for many to around 30-minutes and we’ll show you how to man- age the process so you can make updates and addi- tions as needed in the future. 1 $750.00 $750.00 Nonprofit Administrative Efficiency Core - Annual Plan Annual subscription fee for the nonprofit rate at the Coordinate level of the Administrative Efficiency Core, prepaid with an annual discount. Up to 125 recurring billing profiles (members). August 5, 2026 – August 5, 2027 1 $1,188.00 $831.60 after 30% discount Nonprofit Community Engagement Core - Annual Plan Annual subscription fee for the nonprofit rate at the Coordinate level of the Community Engagement Core, prepaid with an annual discount. August 5, 2026 – August 5, 2027 1 $1,188.00 $1,188.00 Page 7 of 49 PRODUCTS & SERVICES QTY UNIT PRICE AMOUNT Professional Assistance Website Setup Your website is one of the most critical aspects of mar- keting and also one of the more challenging tasks to get right. We’ll migrate your existing content and guide in creating additional content based on our proprietary Marketing 3-4-5™ approach.  We’ll deliver a website with a well-structured modern and mobile-friendly design, and implement calls-to-ac- tion along with a robust directory, calendar, job board, and volunteer opportunities board. Includes 10 prepared pages as well as a blog, commu- nity calendar, directory, and more including Express Email Newsletters to simplify the creation and sending process, Google Business Profile integration, and cross- promotion. Social media profiles will be featured on the site with links. Migrating blog posts (articles) and events can be done for $15 per post. Prepared Pages are those pages Locable implements for you utilizing our approach. You’re free to add unlim- ited pages and data-driven pages such as the directory, calendar, blog posts, customer reviews, and more don’t count toward the Prepared Pages count. Advanced design elements and greater customization including integrations are available for an additional one-time fee. 1 $1,775.00 $1,775.00 Subtotal $4,544.60 Total $4,544.60 Comments You will be charged on a recurring basis via credit card or ACH. By paying this invoice, you authorize Locable to automatically charge your [bank account/card] for the agreed amount on a recurring basis unless you cancel in writing at least 30 days before your renewal date. This invoice is issued in accordance with Locable’s Terms of Service, Privacy Policy, and applicable software plans as outlined at www.locable.com. Promotional or bundled discounts may be applied. All fees are listed in USD and are subject to sales tax (as applicable). Page 8 of 49 Page 9 of 49 5226 Harding Avenue, Plover, WI 54467 *Sealcoating *Striping *Crack Sealing *Routing *Court Resurfacing *Infrared Heat Patching Brandon Newby Cell 715-340-5261 brandonsnewby@gmail.com 715-592-3641 Office www. arrowprecisionasphalt.com ASPHALT MAINTENANCE ESTIMATE NAME: ______________________________ JOB ADDRESS: ______________________________ ______________________________________ BILLING J OB INSTRUCTIONS: ADDRESS: _ _________________________ ______________________________________ _ _________________________ ______________________________________ PHONE: _ _____________________________ ______________________________________ _ _____________________________________ o DRIVEW AY Work Description: *Asphalt will be edged prior to cleaning. *Asphalt is swept and cleaned with powered brooms and blowers. *Asphalt cracks are cleaned with a wire wheel machine or routed to specifications and torched. Cracks are filled with WI DOT approved hot rubberized crack filler. *After the asphalt is cleaned and repairs are completed, then the parking lot is sealcoated with 1 or 2 coats of coal-tar sealer or asphalt emulsion if requested. *Line striping is completed with white or yellow WI DOT approved striping paint. *Owners are responsible for clearing the lot prior to scheduled date and time. SEALER SQ. FT. ________________ SEALING COST: $_______________ CRACK FILLER LN. FT. ________________ CRACK FILLER COST: $_______________ RO UTING LN. FT. ________________ ROUTING COST: $_______________ STRIPING LN. FT. ________________ STRIPING COST: $_______________ # OF INFRARED HEAT PATCHES: _______ PATCHING COST: $_______________ TOTAL COMPLETE: $ ________________ CUSTOME R SIGNATURE: __________________________________ Date: _________________ ACCEPTED BY: ___________________________________________ Date: _________________ *Becomes a binding contract when signed and dated by both parties.* ALL WORK IS FULLY INSURED WITH A ONE YEAR CONDITIONAL GUARANTEE ARROW PRECISION MEETS OR EXCEEDS ALL INSURANCE REQUIREMENTS All Sealer has a 3% Rubber Modifier & 3% Sand Added for a quality finished product. All Taxes Included Stevens Point Business Park -BID Karen 1105 Main St Suite A Stevens Point, WI 54481 715-496-0823 Walking Path- Overlay section threw woods - South to bridge 1.5" $10,930.00 O -------------- 85,800 12,870.00 9,400 5,170.00 x x x x x x 18,040.00/ $28,970.00 w/ paving 7-15-26 Page 10 of 49 QUOTE Quote Nbr.: Q007477 Quote Date: 6/26/2026 Valid Until: Roberts Irrigation Company Inc. 1500 Post Road Plover, WI, 54467 Phone: (715) 344-4747 Sales Person: Customer ID: 10062 Reference: For: JASON PRONDZINSKI Web: robertsirrigation.com FOR: Location BILL TO: JAY'S LAWN CARE 3000 South Dr. Plover WI 54467 United States of America Industrial park JAY'S LAWN CARE 3000 South Dr. Plover WI 54467 United States of America Attn: JASON PRONDZINSKI NOTES: NO. ITEM QTY. UOM PRICE AMOUNT 1 5500: LABOR ELECTRICAL 2 MAN 20.00 HOUR 188.00 3,760.00 Labor to remove existing wires in conduit repair known break and reinstall wire. Also repair wires to zones. 2 EN6THHN: WIRE COPPER THHN #6 1800.00 FT 1.38 2,490.84 3 EN10THHN: WIRE COPPER THHN #10 3600.00 FT 0.60 2,172.96 4 EN20080: CONDUIT PVC 2" SCH80 10.00 FT 2.77 27.69 5 EN201: COUPLER PVC 2" 2.00 EA 2.88 5.77 6 ENHS16-12: HEAT SHRINK SMALL 4' QTY OF 5 8.00 FT 22.75 182.03 7 EN-CRIMP: MISC. CRIMP CONNECTORS 40.00 EA 2.01 80.40 Parts & labor are estimated and will be billed as actual. Milestone billing will be used for projects. Freight not included. Estimate is valid for 7 days from date on quote. All prices are adjustable to those in effect at time of installation/delivery. Signature: Quote Total: 8,719.69 Less Discount: 0.00 Tax Total: 0.00 Total (USD): 8,719.69 2% 10 days cash, net 30 days cash or credit card Does not apply to pivot sales inclusive of erection and wiring of pivot Cash discount of $ 174.39 If paid by within 10 days of Service Date. Invoices not paid within 30 days will result in a 7% finance charge. Page 11 of 49 P.O. Box 1465 961 Main St. Ouray, CO 81427 aviadg.com RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence Stevens Point Business Park Rebranding Brand Development August 14, 2026 Page 12 of 49 Stevens Point | Business Park Branding | Brand Development | August 14, 2026 2 RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence Brand Development Adds something to the name > Adds clarity > Expands meaning > Helps identify > Adds a new dimension > Creates a visual abbreviation Page 13 of 49 Stevens Point | Business Park Branding | Brand Development | August 14, 2026 3 RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence EastPoint Business Park Stevens Point Business Park Two Names Page 14 of 49 Stevens Point | Business Park Branding | Brand Development | August 14, 2026 4 RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence East Point Business Park Stevens Point Business Park Name Emphasis East Point is the unique identifier Business Park is the unique identifier Page 15 of 49 Stevens Point | Business Park Branding | Brand Development | August 14, 2026 5 RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence East Point Business Park Stevens Point Business Park EastPoint is the unique identifier. It could stand alone in conversation. “Our company is located in East Point.” Business Park becomes the unique identifier. There are hundreds of businesses with Stevens Point in the name. Business Park is a generic descriptor and becomes one of three: Industrial Park; Business Park; Commerce Park. “Our company is located in the business park.” Page 16 of 49 Stevens Point | Business Park Branding | Brand Development | August 14, 2026 6 RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence East Point BUSINESS PARK Page 17 of 49 Stevens Point | Business Park Branding | Brand Development | August 14, 2026 7 RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence A1 Page 18 of 49 Stevens Point | Business Park Branding | Brand Development | August 14, 2026 8 RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence A1 Page 19 of 49 Stevens Point | Business Park Branding | Brand Development | August 14, 2026 9 RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence A2 Page 20 of 49 Stevens Point | Business Park Branding | Brand Development | August 14, 2026 10 RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence A2 Page 21 of 49 Stevens Point | Business Park Branding | Brand Development | August 14, 2026 11 RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence Stevens Point | Business Park Branding | Brand Development | Signage Mock-up | Concept A1 at Day | July 24, 2026 A1 Page 22 of 49 Stevens Point | Business Park Branding | Brand Development | August 14, 2026 12 RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence Stevens Point | Business Park Branding | Brand Development | Signage Mock-up | Concept A1 at Night | July 24, 2026 A1 Page 23 of 49 Stevens Point | Business Park Branding | Brand Development | August 14, 2026 13 RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence Stevens Point | Business Park Branding | Brand Development | Signage Mock-up | Concept A5 at Day | July 24, 2026 A2 Page 24 of 49 Stevens Point | Business Park Branding | Brand Development | August 14, 2026 14 RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence Stevens Point | Business Park Branding | Brand Development | Signage Mock-up | Concept A5 at Night | July 24, 2026 A2 Page 25 of 49 Stevens Point | Business Park Branding | Brand Development | August 14, 2026 15 RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence A1 A2 Page 26 of 49 Stevens Point | Business Park Branding | Brand Development | August 14, 2026 16 RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence Stevens Point BUSINESS PARK Page 27 of 49 Stevens Point | Business Park Branding | Brand Development | August 14, 2026 17 RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence Without a unique name, the business park should be aligned with other city brand elements. Page 28 of 49 Stevens Point | Business Park Branding | Brand Development | August 14, 2026 18 RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence B1 Page 29 of 49 Stevens Point | Business Park Branding | Brand Development | August 14, 2026 19 RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence B1 Page 30 of 49 Stevens Point | Business Park Branding | Brand Development | August 14, 2026 20 RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence B2 Page 31 of 49 Stevens Point | Business Park Branding | Brand Development | August 14, 2026 21 RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence B2 Page 32 of 49 Stevens Point | Business Park Branding | Brand Development | August 14, 2026 22 RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence Stevens Point | Business Park Branding | Brand Development | Signage Mock-up | Concept B8 at Day | July 24, 2026 B2 Page 33 of 49 Stevens Point | Business Park Branding | Brand Development | August 14, 2026 23 RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence Stevens Point | Business Park Branding | Brand Development | Signage Mock-up | Concept B8 at Night | July 24, 2026 B2 Page 34 of 49 Stevens Point | Business Park Branding | Brand Development | August 14, 2026 24 RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence Stevens Point | Business Park Branding | Brand Development | Signage Mock-up | Concept B8 at Day | July 24, 2026 B2 Page 35 of 49 Stevens Point | Business Park Branding | Brand Development | August 14, 2026 25 RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence Stevens Point | Business Park Branding | Brand Development | Signage Mock-up | Concept B8 at Night | July 24, 2026 B2 Page 36 of 49 Stevens Point | Business Park Branding | Brand Development | August 14, 2026 26 RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence B1 B2 Page 37 of 49 Stevens Point | Business Park Branding | Brand Development | August 14, 2026 32 RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence A1 B1 B2 A2 Page 38 of 49 Stevens Point | Business Park Branding | Brand Development | August 14, 2026 33 RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence Next Steps > Decide on a single name and graphic brand > Create a simple design guide > Start on sign designs Page 39 of 49 P.O. Box 1465 961 Main St. Ouray, CO 81427 aviadg.com RailwayMedium PRESENTS 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 47 33 84 38 84 83 28 54 53 1C 23 16 42 19 159 157 109 9F 9D 6D 70% 20% 20% 20% 20% 42 90 44 33 117 43 76 75 2B 4C 70% 50% 20% Elevating Places Through Design Excellence Page 40 of 49 Land Use Plan Page 41 of 49 Land Use Plan Page 42 of 49 Prohibited Uses Page 43 of 49 Building & Pavement Setbacks Page 44 of 49 Impervious Surface Ratios Page 45 of 49 Building Materials Page 46 of 49 Investment Criteria Page 47 of 49 Parking & Loading Page 48 of 49 Maintenance Page 49 of 49

Source: City of Stevens Point website. First collected Oct 1, 2026.