RecordWell Data

Public Works & Highways Committee — Agenda Packet

Village of Germantown · Washington County · Public Works & Highways Committee · meeting of Nov 4, 2026 · Agenda packets

Open the original document More from Village of Germantown

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

MEETING: REGULAR MEETING OF THE PUBLIC WORKS & HIGHWAYS COMMITTEE DATE & TIME: Wednesday, November 4, 2026 at 5:30 PM LOCATION: Germantown Village Hall Board Room N112 W17001 Mequon Road Any member of the body and/or citizen may attend the meeting virtually through the WebEx platform, Meeting #: 2555 672 0428 Password: ZNmFyjsD343 which can be accessed by phone at 408-418-9388 or by logging on at: https://villageofgermantown.my.webex.com/villageofgermantown.my/j.php?MTID=m74fc637a5ed76641ae00927df49e88a9 Citizens not wishing to attend the meeting personally or virtually may submit any public comments by filling out the Online Comment Form by 4:00 PM on the day of the meeting so that it can be provided to the members of the body for their consideration. Previously recorded Board, Committee, and Commission meeting videos can be viewed at https://www.youtube.com/@villageofgermantownwi AGENDA I. CALL TO ORDER: This meeting has been given public notice in accordance with Section 19.83 and 19.84, Wis. Stats, in such form that will apprise the general public and news media of subject matter that is intended for consideration and action. II. ROLL CALL: III. MEETING MINUTES: A. October 7, 2026 (ACTION) IV. PUBLIC COMMENT: Please be advised per State Statute Section 19.84(2), information will be received from the public. It is the policy of this municipality that there be a four-minute time period, per person, with time extensions per the Chief Presiding Officer’s discretion; be further advised that there may be limited discussion on the information received, however, NO ACTION will be taken under public comments. Comments that may be injurious to village personnel or other individuals will not be allowed. V. UNFINISHED BUSINESS: VI. NEW BUSINESS: A. Sutton Farms Development Agreement (ACTION) B. A Resolution Terminating the Use of Additive Fluoride in the Germantown Public Water System. (ACTION) C. Award of Contract to Zenith Tech, Inc. in the amount of $95,600.00 and to include a 10% contingency of $9,560.00 for a total amount of $105,160.00 for the Maple Road Bridge Repair. (ACTION) Page 1 of 84 PUBLIC WORKS & HIGHWAYS COMMITTEE AGENDA November 4, 2026 Page 2 D. Award of Contract to Southern Wisconsin Appraisals for Appraisal Services for WisDot Project 2300-05-21 in the amount of $107,850.00. (ACTION) VII. DIRECTOR'S REPORT: A. November Director's Report (DISCUSSION) VIII. NEXT MEETING DATE: IX. ANNOUNCEMENTS: X. ADJOURNMENT: UPON REASONABLE NOTICE, efforts will be made to accommodate the needs of disabled individuals through appropriate aids and services. For additional information or to request this service, please contact the Village Clerk at (262) 250-4745 at least 2 days prior to the meeting. Notice is hereby given that a possible quorum of other boards, committees, and/or commissions may attend this meeting to gather information about an item over which they have decision-making responsibility. This may constitute a meeting of these bodies per State ex rel. Badke v Greendale Village Board, even though these bodies will not take formal action at this meeting. Page 2 of 84 ttt- MEETING: DATE & TIME: LOCATION: Village of Germanclo n REGULAR MEETING OF THE PUBLIC WORKS & HIGHWAYS COMMITTEE Wednesday, October 7,2026 at 5:30 PM Germantown Village Hall Board Room N112 W17001 Mequon Road I. CALL TO ORDER: il. Chairperson Kaminski called the Public Works and Highways Committee meeting to order at 5:30PM. ROLL CALL: Present: Trustee Terri Kaminski, Trustee Robert Warren, Trustee Jan Miller (via WebEx from start of meeting through New Business, ltem A), Trustee Jim Stout Absent: None Excused: Trustee Jan Miller after voting on New Business, ltem A III. MEETING MINUTES: A. September 2,2026 (ACTION) Motion: Approve as presented Motioned By: Robert Warren Seconded By: Jim Stout Yes: Terri Kaminski, Robert Warren, Jan Miller, Jim Stout No: None Abstain: None tv. Motaon: Approve a 3olo water rate increase as presented, with a recommendation to update the 10-year cash flow and rate projections. Motioned By: Jim Stout V MINUTES Motion Passed (Yes 4, No 0, Abstained 0) PUBLIC COMMENT: None UNFINISHED BUSINESS: A. Consideration of a water rate increase. (ACTION) Page 3 of 84 Page 2 vt. Seconded By: Terri Kaminski Yes: Terri Kaminski, Robert Warren, Jan Miller, Jim Stout No: None Abstain: None Motion Passed (Yes 4, No 0, Abstained 0) B. Consideration of a sewer rate increase. (ACTION) Motion: Approve a 37o sewer rate increase as presented, with a recommendation to update the '10-year cash flow and rate projections. Motioned By: Robert Warren Seconded By: Jim Stout Yes: Terri Kaminski. Robert Warren, Jan Miller, Jim Stout No: None Abstain: None Motion Passed (Yes 4, No 0, Abstained 0) NEW BUSINESS: A. Drainage Complaint - W214N10288 Beech Dr. (ACTION) Motion: Table and assign the new Village Engineer investigate all possible solutions and come back with a recommendation at the December PWHC Meeting. Motioned By: Terri Kaminski Seconded By: Robert Warren Motion Passed (Yes 4, No 0, Abstained 0) B. Consideration of a Change Order with Foth for Continuing Property Records not to exceed $35,000.00. (ACTION) Motaon: Approve as presented Motioned By: Robert Warren Seconded By: Teni Kaminski Yes: Terri Kaminski, Robert Warren, Jim Stout No: None Abstain: None Motion Passed (Yes 3, No 0, Abstained 0) C. Consideration of contract with Lee Mechanical for $26,1 75.00 and allow contingency up to the full amount remaining in budget not to exceed $28,200.00 for 2026 Library HVAC Control Project. (ACTION) Yes: Teni Kaminski, Robert Warren, Jan Miller, Jim Stout No: None Abstain: None Page 4 of 84 Page 3 Motion: Fonivard to Village Board as presented with a positive recommendation Motioned By: Robert Warren Seconded By: Teni Kaminski Yes: Terri Kaminski, Robert Warren, Jim Stout No: None Abstain: None Motion Passed (Yes 3, No 0, Abstained 0) D. Consideration of Quote with MACORP to paint the Outdoor Picnic Shelter at Firemens Park not to exceed $24,069.00. (ACTION) Motion: Approve as presented Motioned By: Robert Warren Seconded By: Teni Kaminski Yes: Terri Kaminski, Robert Warren, Jim Stout No: None Abstain: None Motion Passed (Yes 3, No 0, Abstained 0) E. Acceptance of lmprovements - CIPP - Visu-Sewer - Hickory Dr. Storm Sewer (ACTTON) Motion: Approve as presented Motioned By: Robert Warren Seconded By: Jim Stout Yes: Teni Kaminski, Robert Warren, Jim Stout No: None Abstain: None Motion Passed (Yes 3, No 0, Abstained 0) F. Update on Solid Waste and Curbside Recycling Collection. (DISCUSSION) DPW Director Zimmerman gave an update on solid waste and curbside recycling collection within the Village. This was a discussion-only item. Three citizens spoke about this discussion item: Norman Berger, W141N9978 Seven Pines Way Gary Konop, N1 17W17815 Augutsa Ct Bob Simonson, N115W17853 Strawgrass Ct G. Update on Status of Fiber lnstallation. (DISCUSSION) Page 5 of 84 Page 4 vil. tx. DPW Director Zimmerman gave an update on the Fiber installation within the Village This was a discussion-only item. One citizen spoke on this discussion item: Brian Sparrow, W'l43N'10660 Magnolia Dr H. Award of Contract to Lalonde Contractors for $702,386.60 and include a '10olo contingency of $70,238.66 not to exceed $77 2,625.26 for County Line and Appleton Avenue Signal, Street Light, and Pedestrian Crossing lmprovements (srsP). (ACTroN) Motion: Foruvard to Village Board for approval of award of contract to Lalonde Contractors for $702,386.60 and include a '10% contingency of $70,238.66 not to exceed $772,625.26 tor County Line and Appleton Avenue Signal, Street Light, and Pedestrian Crossing lmprovements (SISP) and include $222,400.00 in the 2027 Capital Budget which is the Village's obligation towards this project. Motioned By: Robert Warren Seconded By: Terri Kaminski Yes: Terri Kaminski, Robert Warren. Jim Stout No: None Abstain: None Motion Passed (Yes 3, No 0, Abstained 0) DIRECTOR'S REPORT: A. October Director's Report (DISCUSSION) DPW Director Zimmerman gave his October Director's Report. Highlights include updates on construction projects, Maple Road bridge repair contract, new Village Engineer to begin employment at the end of October, and water main breaks within the Village. VIII. NEXT MEETING DATE: The next Public Works and Highways Committee Meeting will be held on November 4. 2026 at 5:30PM. ANNOUNCEMENTS: x None ADJOURNMENT: Chairperson Kaminski adjourned the meeting at 7:2BPM. Page 6 of 84 BUSINESS OF THE PUBLIC WORKS & HIGHWAYS COMMITTEE MEETING DATE: November 4, 2026 PLACEMENT: Action Item ITEM TITLE: Sutton Farms Development Agreement (ACTION) SUBMITTED BY: Timothy Zimmerman, Public Works Director SUMMARY EXPLANATION: Before the Committee is the Development Agreement for the Sutton Farms development located at the north-east corner of Lannon Road and County Line Road. The Agreement is the Village's standard-form agreement modified to reflect the specifics of the development. The biggest difference in this agreement vs agreements previously approved is that the Developer plans to complete the development in multiple phases, which is reflected. The agreement also reflects the private lift station that will be used for part of the development. Maintenance and operation of the lift station will remain with the Homeowner's Association, as is called for in the agreement. The exhibits are, as is typical for the committee level, still being finalized but will be complete for consideration by the Village Board. ATTACHMENT: 1. Sutton Farms Development Agreement (MBF 10.22.26) @3PM - 55254378.1 STAFF RECOMMENDATION: A motion to recommend approval of the development agreement to the Village Board. ACTION BY COMMITTEE: Page 7 of 84 1 SUTTON FARM SUBDIVISION DEVELOPMENT AGREEMENT THIS SUTTON FARM SUBDIVISION DEVELOPMENT AGREEMENT (“Agreement”) is entered into as of the Effective Date (as defined below) by and between the Village of Germantown, a municipal corporation of the State of Wisconsin located in Washington County, hereinafter called the "Village", and Home Path Financial Limited Partnership, the developer of the Sutton Farm Subdivision, hereinafter referred to as “Developer”. WHEREAS, the Developer has certain lands within the Village under ownership or contract to develop, said lands being more specifically described in Exhibit A (the “Property”); and WHEREAS, Developer has submitted, and the Village has approved, a preliminary plat and development plan for development of the Property into a residential subdivision, which will consist of 143 single-family residential lots, 26 duplex condo units and 102 multi-family condo units (the “Development” or “Subdivision”). A copy of the approved preliminary plat is attached as Exhibit B (“Plat”); and WHEREAS, Developer has submitted for approval by the Village a development plan (“Development Plan”) for the Development to be developed in five (5) phases (each a “Phase” and collectively the “Phases”). The approved Development Plan is attached as Exhibit E; and WHEREAS, the Village may require that Developer make and install certain public improvements reasonably necessary and/or that Developer execute a certified check or irrevocable letter of credit to ensure that those public improvements will be made within a reasonable time; and further that the acceptance of dedication of these public improvements may be conditioned upon the construction of such public improvements according to Village specifications and without cost to the Village, all as detailed and described in this Agreement; and WHEREAS, it will be necessary that Developer construct and install certain water main, sanitary sewer, storm sewer, landscaping, lighting, signs, and roadway facilities in public right-of- way and storm water management facilities in a dedicated easement on the subject Property, and the Village will require that such plans and designs be approved and permitted, and that the Developer furnish an appropriate financial guarantee, all as detailed and described in this Agreement; and WHEREAS, all improvements (other than Advance Site Work, as defined below) required to support the lots within that particular Phase (including but not limited to a water looping system to the extent necessary) shall be completed with such Phase. Notwithstanding the foregoing, which shall generally consist of erosion control, minor earthwork to strip and fill overburden material and build staging area for crushing activities, blasting necessary to fracture all expected bedrock on the site and crushing of excavated bedrock, and those improvements and site work items specifically identified on Exhibit F attached hereto (collectively, “Advance Site Work”) shall be Page 8 of 84 2 completed as part of Phase I of the Development. All other improvements and site work, including any sanitary sewer, water main, grading, blasting, rock crushing, or other earth work not identified on Exhibit F, shall be completed as part of the Phase of the Development that such improvements or work will support. WHEREAS, the Village seeks to protect the health, safety and general welfare of the Village as a whole and, in particular, property owners who abut the site or are potentially affected by the project through application of the Municipal Code and rules and regulations of governmental agencies with jurisdiction. NOW, THEREFORE, in consideration of these recitals, the mutual agreements, benefits and responsibilities outlined herein, and for other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the parties agree as follows: ARTICLE I - REQUIRED IMPROVEMENTS 1.01 GENERALLY. The recitals set forth above are hereby incorporated into and made a part of this Agreement. Developer, entirely at its own expense, shall, except as herein provided, design and install the public improvements required under this Agreement for the Development in accordance with the provisions of Sec.18.08 of the Municipal Code and as directed by the Village Engineer or Village Board (“Public Improvements”). It is the intent of this Agreement that all Public Improvements shall be installed by Developer. 1.02 SANITARY SEWERAGE SYSTEMS. Except as set forth below, with each Phase, Developer shall extend and install public sanitary sewer with privately owned lateral stubs extending to the edge of right-of-way to provide wastewater utility service to all lots within the Subdivision. Notwithstanding the foregoing, all sanitary sewerage system work constituting Advance Site Work shall be completed as part of Phase I of the Development. (1) The Village has approved certain exceptions to Village specifications regarding sanitary sewer depth and private lift stations conditioned on conformity to preliminary plans and conditions set by the Village Board. Developer shall construct, install, furnish, and provide private sanitary sewers leading to a private sanitary lift station with private sanitary force mains through part of the Subdivision. Installation to be in accordance with plans and specifications approved by the Wisconsin Department of Natural Resources (WDNR), Wisconsin Department of Safety and Professional Services (DSPS), Milwaukee Metropolitan Sewerage District (MMSD) and Southeast Wisconsin Regional Planning Commission (SEWRPC). The proposed Private sanitary system plans will be transmitted to the Village, reviewed and inspected by the Village. (a) Developer shall prepare a pro forma showing the total estimated costs of operation, maintenance, repair and replacement of the private lift station over its expected useful life cycle to ensure perpetual operation. Prior to the Developer transferring the private sanitary system facilities, including the private lift station, to the applicable homeowners Page 9 of 84 3 association, the Developer shall make a one-time capital contribution to the applicable homeowners association reserve fund for the purpose of funding future maintenance of the private lift station. The amount of such capital contribution shall equal one (1) year’s portion of the estimated total cost identified in the pro forma as amortized over the lift station’s design life. The pro forma shall be shared with purchasers of lots within the subdivision to help ensure that the applicable homeowners association appropriately budgets for perpetual operating expenses related to the private lift station. (b) Once the Developer transfers private sanitary facilities to the applicable homeowners association, the maintenance, repair, and replacement of the private lift station shall be the responsibility of the applicable homeowners association, or its assignee, in perpetuity. In the event that the applicable homeowners association ceases to exist, the individual owners of the lots served by the private lift station shall be jointly and severally be responsible for the private lift station. (c) The private sanitary lift station will continuously display signage indicating it is private. The installation of the signage is the responsibility of the Developer. Maintenance and replacement of the signage, as needed, shall be the responsibility of the applicable homeowners association, or its assignee. (2) Developer shall design and submit to the Village Engineer for review and approval all proposed plans, specifications and contract documents for all sanitary sewerage system facilities before authorization for construction will be given. Design and installation shall conform to MMSD Ch. 2 Rule, WDNR Standards, Sec. 18.08(7) of the Municipal Code, and the applicable provisions of the Village of Germantown Development Handbook, including Section 3 “Sanitary Sewer System”. All such documents shall be prepared in accordance with state and local standards by a Professional Engineer registered in the State of Wisconsin and submitted stamped and signed for review by the Village Engineer and by all applicable governmental agencies. Implicit in this provision is the right of the Village Engineer and Building Inspector to require document revisions and modifications solely to the extent necessary to make the Public Improvements compliant with applicable law. All sanitary sewer Public Improvements that are to be transferred to the Germantown Wastewater Utility shall be contained within the Village right- of-way or a utility easement. The easement shall be dedicated to the Village through plat (provided that said plat also contains specific terms associated with the easement and not just a location) or an easement document prepared and submitted by Developer, subject to review and approval by the Village Engineer and the Village Attorney. (3) Public utility permits shall be applied for by the Developer and secured from the Village Engineering Department, the WDNR and MMSD. Sanitary sewer extension forms shall be prepared by Developer and provided to the Village Engineer. All sanitary sewer Public Improvements that will be transferred to the Village shall be inspected by Wastewater Utility personnel prior to acceptance by the Public Works & Highway Committee. The Wastewater Utility may televise the sewer, create a punch list of defects, and perform one follow-up televised Page 10 of 84 4 inspection at no expense to Developer. Additional follow-up televised inspections shall occur at Developer expense. (4) Construction of the public sanitary sewer system Public Improvements will be completed to the point of substantial completion within each Phase, before any conditional occupancy permits are issued for lots within such Phase; provided, however, that any sanitary sewerage system work constituting Advance Site Work shall be completed as part of Phase I. Following completion of the punch list to the Village’s satisfaction, final acceptance of the sanitary sewer Public Improvements for each Phase will be considered at the next available Public Works and Highways Committee Meeting. The public sanitary sewer Public Improvements within each Phase shall be completed, dedicated, and accepted within one year from the commencement of work on such Phase. If requested by Developer, and provided Developer has used commercial reasonable efforts to commence and continue such work, the Village Engineer shall extend this deadline in up to one (1) year increments upon receipt of a formal written request by the Developer. (5) Sanitary sewer main and lateral trenches in an existing roadway shall be aggregate compacted backfilled or as required by ordinance or published specifications of governing body. Street resurfacing required due to surface disturbance for connection to the Village sanitary sewer shall be inspected and approved by the Highway Superintendent prior to acceptance by the Public Works & Highway Committee. Lateral ends shall be marked with green painted boards 2" x 4". (6) Developer to provide a sanitary easement for future connection at CTH Y and “L Street” or in dedicated accessible easement (in northbound right turn lane). This is consistent with the Village of Germantown 2050 comprehensive plan for future sanitary sewer service, in lieu of extending the sanitary sewer along the north side of the County Line Road right of way. (7) Village acknowledges and agrees that sewer main connection at the SE corner of the Development shall be accessed by an easement granted from WE Energies for such purposes of pipe installation only and maintaining that pipe. The effort and cost of acquiring such easement shall be the responsibility of Developer. Easement will be granted to Village and Village agrees to work with Developer to acquire and execute necessary documents related to this easement. 1.03 WATER SUPPLY FACILITIES. Except as set forth below, with each Phase, Developer shall extend and install public water main with publicly owned lateral stubs extending to the edge of right-of-way to provide potable water utility service to all lots within the Subdivision. Notwithstanding the foregoing, all water supply facilities work constituting Advance Site Work, shall be completed as part of Phase I of the Development. (1) Developer shall design and submit to the Village Engineer for approval all proposed plans, specifications and contract documents for all water supply facilities before authorization of construction will be given. Design and installation shall conform to Sec. 18.08(8) Page 11 of 84 5 of the Municipal Code and the applicable provisions of the Village of Germantown Development Handbook, including Section 2 “Water System”. All such documents shall be prepared in accordance with state and local standards by a Professional Engineer registered in the State of Wisconsin and submitted stamped and signed for review by the Village Engineer and by all applicable governmental agencies. Implicit in this provision is the right of the Village Engineer and Building Inspector to require document revisions and modifications solely to the extent necessary to make the Public Improvements compliant with applicable law. All water utility improvements that are to be transferred to the Germantown Water Utility shall be contained in Village right-of-way or a utility easement dedicated to the Village. The easement shall be dedicated to the Village through plat (provided that said plat also contains specific terms associated with the easement and not just a location) or an easement document prepared and submitted by Developer, subject to review and approval by the Village Engineer and the Village Attorney. (2) Public utility permits shall be applied for by Developer and secured from the Village Engineering Department. and the WDNR with water main extension forms prepared by Developer and submitted to WDNR. All water system improvements that will be transferred to the Village shall be inspected by Water Utility personnel prior to acceptance by the Public Works & Highway Committee. (3) Water main and lateral trenches in an existing roadway shall be aggregate slurry backfilled. Street resurfacing required due to surface disturbance for connection to the Village water system shall be inspected and approved by the Highway Superintendent prior to acceptance by the Public Works & Highway Committee. Lateral ends shall be marked with blue painted maple heart boards 2" x 4". A minimum of 6 feet of engineered fill shall be maintained over the pipe in all areas of installation. (4) A portion of the Property has been reserved for future use by the Village for the purpose of constructing a municipal water well for the Germantown Water Utility as is shown on the Preliminary Plat. This parcel shall be dedicated to the Village upon acceptance of the Final Plat in accordance with Wis. Stat. § 236.29. 1.04 OTHER UTILITIES. Developer shall be responsible for and cause electrical power, telephone, cable, fiberoptic, natural gas, and like facilities to be installed in such manner as to make proper and adequate service available to each occupied building in the Subdivision. All such services shall be located underground in accordance with applicable codes. Design and installation shall conform to Sec. 18.08(11) of the Municipal Code. Public utility and/or work-in-right-of-way permits shall be applied for by Developer or the contractor doing work in the Development (e.g., We-Energies) and secured from the Village Engineering Department. Private utility permits shall be applied for and secured from the Village Building Inspection Department. 1.05 GRADING AND SURFACING OF PUBLIC STREETS. Except as set forth below, with each Phase, all Development streets shall be graded and surfaced in accordance with Sections 18.08(2), (3) and (5) of the Municipal Code and shall be located and be of the dimensions as depicted on the site Development Plan. The Development’s internal roads shall have an urban Page 12 of 84 6 cross section for vehicular access to all lots within the Subdivision. Unless otherwise identified in the approved Development Plan, the final layer of street surfacing shall be installed within thirty (30) days of the issuance of an occupancy permit for 80% of all the lots within the Phase of the Subdivision except as may be directed by the Village Engineer. Disturbed edges of existing asphalt created by connecting to existing Village or County streets shall be saw-cut full road width prior to resurfacing. Notwithstanding the foregoing, the Village acknowledges and agrees that the Developer may obtain building permits for up to three (3) model homes prior to completion of street grading, surfacing, and acceptance of public streets; provided that (i) safe and adequate temporary access acceptable to the Village Engineer is provided, and (ii) all other applicable requirements for issuance of building permits are satisfied. The incomplete status of street grading or surfacing shall not, by itself, be grounds for denial of building permits for such model homes. All grading and surfacing work constituting Advance Site Work shall be completed as part of Phase I of the Development. (1) Developer shall design and submit to the Village Engineer for approval all proposed plans, specifications and contract documents for all grading, street surfacing, concrete curb and gutter, sidewalks, and traffic signs and street signs before authorization for construction will be given. Design and installation shall conform to Sec. 18.08(2), 18.08(3), 18.08(4), 18.08(6), and 18.08(13) and 18.08(15) of the Municipal Code and the applicable provisions of the Village of Germantown Development Handbook including but not limited to Sections 1.3 “Master Grading and Drainage Plans”, Section 5 “Road System” and 6.3.6 “Grading Certification Plan”. All such documents shall be prepared in accordance with state and local standards by a Professional Engineer registered in the State of Wisconsin and submitted stamped and signed for review by the Village Engineer and by all applicable governmental agencies. Implicit in this provision is the right of the Village Engineer and Building Inspector to require document revisions and modifications in the best interests of the Village. All grading, street surfacing, concrete curb and gutter, traffic signs and street signs that are to be transferred to the Village shall be contained in Village right- of-way dedicated to the Village. (2) Final yard grades, building elevations and contours shall conform to a 0.25- feet tolerance as compared to the grading plan pursuant to Sec. 14.076 of the Municipal Code. Developer shall not export topsoil without permission from the Public Works & Highway Committee pursuant to Sec. 17.441 of the Municipal Code. (3) Work-in-right-of-way permits shall be applied for by Developer and secured from the Village Engineering Department and, as necessary based upon jurisdiction, the Washington and Waukesha County Highway Departments. All grading, street surfacing, concrete curb and gutter, sidewalks, and traffic signs and street signs related to the Subdivision that will be transferred to the Village shall be inspected by Engineering Department and Highway Department personnel prior to acceptance by the Public Works & Highway Committee. (4) All rock crushing and blasting shall be permitted by the Village and comply with the Village Municipal Code 12.181. Advance Site Work shall be completed as part of Phase I of the Development. Developer shall provide a pre-blasting video and post-blasting video survey Page 13 of 84 7 of structures on adjacent private properties unless reasonable access is denied by the owner of such adjacent property. The video surveys shall include foundation walls, windows, and interior walls as well as an exterior survey. The pre and post blasting video shall be stored by the Developer for a period of three (3) years and made available to the property owner and/or the Village upon request. (5) The Developer shall maintain all private streets within the Subdivision until such time as maintenance responsibility is formally transferred to the applicable homeowners association, or its assignee, in accordance with Paragraph 9.11(4) below. 1.06 CURB AND GUTTER. With each Phase, Developer shall construct, at a minimum, concrete curb and gutter in accordance with Sec. 18.08(4) of the Municipal Code within the Development at the locations depicted on the approved Development Plan. 1.07 IMPROVEMENTS TO STREETS ABUTTING SUBDIVISION. Developer shall install entrance intersections connecting the Subdivision’s internal roads to County Line Road (CHT Q) and to Lannon Road (CTH Y) including acceleration/deceleration lanes and any by-pass turn lanes, as required by the respective permitting authorities. Developer shall design and submit to the Village Engineer for approval all proposed plans, specifications and contract documents for all improvements to streets abutting development before authorization for construction will be given. Design and installation shall conform to Sec. 18.08(15) and Chapter 29 of the Municipal Code and the applicable provisions of the Village Development Handbook including Section 1.4. “Erosion Control Plan” and Sec. 5 “Road System”. All such documents shall be prepared in accordance with state and local standards by a Professional Engineer registered in the State of Wisconsin and submitted stamped and signed for review by the Village Engineer and by all applicable governmental agencies. Implicit in this provision is the right of the Village Engineer and Building Inspector to require document revisions and modifications solely to the extent necessary to make the Public Improvements compliant with applicable law. All improvements to streets abutting development that are to be transferred to the Village shall be contained in Village right-of-way dedicated to the Village. Work-in-right-of-way permits shall be applied for by Developer and secured from the Village Engineering Department and, as necessary based upon jurisdiction, the Washington and Waukesha County Highway Departments. All improvements to streets abutting the Subdivision that will be transferred to the Village shall be inspected by Engineering Department and Highway Department personnel prior to acceptance by the Public Works & Highway Committee. Developer shall remain responsible for maintenance of all monument signs and boulevard islands until such time as maintenance responsibility is formally transferred to the applicable homeowners association, or its assignee, in accordance with Paragraph 9.11(4) below. 1.08 SIDEWALK/PATHWAY. With each Phase, Developer shall construct a sidewalk directly connected to the existing sidewalk dead end. The sidewalks in the right-of-way are to be Page 14 of 84 8 a public improvement. Paved pathways outside of the right-of-way are to be maintained and replaced by the applicable homeowners association. The Developer shall be responsible for all costs for design and installation of the sidewalks in the right-of-way and pathways on private property. Snow removal and ice control of the sidewalks and pathways shall be the responsibility of the respective owners, as outlined in Village ordinances. Developer shall install a paved sidewalk in the right-of-way, or as pathway on private property in Outlot 1, extending the dead end sidewalk with full connectivity through the northwest corner of County Line Road (CTH Q) and Lannon Road (CTH Y) to the new road labeled “Street D” that is located approximately 900 feet east of Lannon Road (CTH Y). Sidewalks and Pathways to be designed and constructed shall conform to Sec. 8.02 of the Municipal Code and the Village Development Handbook including Section 5.2.13. All such documents shall be prepared in accordance with state and local standards by a Professional Engineer registered in the State of Wisconsin and submitted stamped and signed for review by the Village Engineer. 1.09 STREET SIGNS & MARKINGS. With each Phase, a street sign marking plan (the “Sign Plan”) shall be submitted by Developer as required in Paragraph 2.03 for review and approval by the Village Engineer. Developer shall pay to the Village Treasurer the cost of all materials and installation of street signs by the Village, pursuant to Section18.08(13) of the Municipal Code. Street signs to include at a minimum stop signs, street name signs, pedestrian walk sign and traffic directional signs. Markings at a minimum shall include stop bars and any other miscellaneous markings as required for public safety. (1) All private roads shall have signage indicating they are private. The street name signage shall indicate the road is private and will consist of white lettering on a blue sign. The private road indication on these signs shall appear above or below the street name but will be in a consistent location on private street signs throughout the Subdivision. (2) Public roads will be labeled with white lettering on a green sign, per MUTCD and Village of Germantown standards. In addition, the Village agrees and acknowledges that the approved Sign Plan may include the following temporary and development-related signage, all subject to final review and approval by the Village Engineer and compliance with applicable codes and ordinances: (i) one (1) 4-foot by 8-foot entrance sign at each entrance to the Subdivision; (ii) one (1) 4-foot by 8-foot “V” sign located at or near the intersection of Lannon Road (CTH Y) and County Line Road (CTH Q); (iii) four (4) 4-foot by 4-foot signs to be displayed in the front yard area of each model home; and Page 15 of 84 9 (iv) up to ten (10) directional signs within the Subdivision and along approved approach routes to direct traffic to the model homes. Such signage shall be located outside of Village right-of-way. All signage described in this subparagraph shall be installed, maintained, and removed by the Developer at its sole cost and expense and shall not be deemed public improvements or accepted by the Village for ownership or maintenance. 1.10 EROSION CONTROL. Developer shall install and maintain erosion and sediment control devices within the Subdivision and for all related work abutting the Subdivision. Developer shall design and submit to the Village Engineer for approval all proposed plans, specifications and contract documents for all construction site erosion and sediment control before authorization for construction will be given. Design and installation shall conform to Wisconsin Department of Natural Resources Conservation Practice Standards, Ch. 29 of the Municipal Code, and the Village Development Handbook including Section 1.4 Erosion Control Plan requirements. All such documents shall be prepared in accordance with state and local standards by a Professional Engineer registered in the State of Wisconsin and submitted stamped and signed for review by the Village Engineer and by all applicable governmental agencies. Implicit in this provision is the right of the Village Engineer and Building Inspector to require document revisions and modifications solely to the extent necessary to make the Public Improvements compliant with applicable law. Developer to secure an Erosion Control Permit for each Phase of work, in addition to any necessary Excavation for Utility Work in the Right-of-Way permit shall be applied for and secured from the Village Engineering Department. Developer to secure a construction site storm water permit from WDNR and provide a copy to the Village Engineer. Individual building site erosion control permits shall be applied for and secured from the Village Building Inspection Department. Developer shall monitor and mitigate off-site tracking through use of tracking pads and daily sweeping of streets. In event Developer defaults in keeping the abutting streets clear of tracking, the Developer will reimburse the Village for performing street sweeping services within 30 days of invoice. In event Developer defaults payment, the Village shall provide Developer with written notice of such default and Developer shall have five (5) days from receipt of such notice to cure such default before the Village may charge the Developer’s escrow account or draw from the Developer’s letter-of-credit to recover such costs. Notwithstanding the foregoing, the right of the Village to respond to off-site sediment tracking hereunder shall not excuse Developer from strict compliance with required erosion control measures or be considered a substitute or replacement for such measures. Developer shall remove and dispose of all erosion and sediment control devices after landscaping and after 85% successful vegetative cover has been achieved to the satisfaction of the Village Engineer. Page 16 of 84 10 1.11 POST-CONSTRUCTION STORMWATER MANAGEMENT AND STORMWATER DRAINAGE FACILITIES. Developer shall install publicly owned storm sewer to adequately drain publicly owned roadways within the Subdivision, and shall install publicly owned roadway ditches and storm sewer abutting the Subdivision. Developer shall install privately owned storm sewer, ditches, and swales to adequately drain privately owned roadways and lands within the Subdivision. Developer shall install and maintain privately owned wet detention ponds and a dry pond to control storm water runoff peak flows and volumes in conformance with MMSD requirements and to control storm water runoff water quality in conformance with WDNR requirements prior to discharge from the Subdivision. The privately-owned storm sewers, ditches, swales, wet detention ponds, and dry pond shall be situated in privately owned easements. Developer shall design and submit to the Village Engineer for approval all proposed plans, specifications and contract documents for all post-construction storm water management and storm water drainage facilities before authorization for construction will be given. Design and installation shall conform to WDNR Conservation Practice Standards, MMSD Ch. 13 Rule, Ch. 27 and Sec. 18.08(10) of the Municipal Code, and the applicable provisions of the Village of Germantown Development Handbook including Sec. 6.3.7 Storm Water BMP Certification Plan and Sec. 4 “Storm Sewer System” requirements. All such documents shall be prepared in accordance with state and local standards by a Professional Engineer registered in the State of Wisconsin and submitted stamped and signed for review by the Village Engineer and by all applicable governmental agencies. Implicit in this provision is the right of the Village Engineer and Building Inspector to require document revisions and modifications solely to the extent necessary to make the Public Improvements compliant with applicable law. Work-in-right-of-way permits shall be applied for by Developer and secured from the Village Engineering Department, WDNR and MMSD storm water management forms shall be prepared by Developer and provided to the Village Engineer. Developer shall prepare, submit to the Village Engineer and Village Attorney for review and approval, and record with the Washington County Register of Deeds a Declaration of Covenant for Storm Water Management Facility Maintenance before applying for an occupancy permit. Developer shall prepare and submit to the Village Engineer a Storm Water Management Facility Compliance Report and an Engineering/Construction Certification letter before applying for an occupancy permit. 1.12 LANDSCAPING. With each Phase, Developer shall provide permanent landscaping, including topsoil, seeding, trees and other vegetation, of all publicly owned rights of way and privately-owned common areas within and abutting the Subdivision. Developer shall also provide temporary landscaping of privately-owned lots to establish and maintain vegetative cover. Developer shall design and submit to the Village Zoning Administrator for approval all proposed plans, specifications and contract documents for all landscaping before authorization for construction will be given. Design and installation shall conform to Sec. 14.085 and 17.43(5) of Page 17 of 84 11 the Municipal Code. All such documents shall be prepared in accordance with state and local standards by a Landscape Architect registered in the State of Wisconsin and submitted stamped and signed for review by the Village Zoning Administrator and by all applicable governmental agencies. Implicit in this provision is the right of the Village Zoning Administrator and Building Inspector to require document revisions and modifications solely to the extent necessary to make the Public Improvements compliant with applicable law. A minimum of 4-inches of topsoil (after settlement) free of deleterious materials shall cover all areas of the site not covered by impervious roofs and/or pavements. Section 17.441(4)(a) of the Municipal Code prohibits topsoil export without special exception by the Village Public Works & Highway Committee. All landscaping related to the Subdivision that will be transferred to the Village shall be inspected by Engineering Department and Highway Department personnel prior to acceptance by the Public Works & Highway Committee. All landscaping related to the Subdivision in privately owned areas shall be inspected by Community Development Department personnel prior to issuing an occupancy permit. 1.13 STREET TREES. With each Phase, Developer shall install street trees in roadway terraces of the Subdivision in a quantity equal or greater than one tree per 50 linear feet as generally depicted in a landscape plan for said street trees and all other common areas and/or outlots within which landscaping will be installed approved by the Village Forester and Community Development Director as required as a condition of preliminary plat approval. Notwithstanding anything in this Agreement to the contrary, the Developer shall not be required to install the street trees required herein for any Phase until the final layer of street surfacing has been installed for such Phase in accordance with Paragraph 1.05, and the deferral of street tree installation shall not, by itself, delay acceptance of the other Public Improvements or the issuance of building or occupancy permits for such Phase. Developer shall design and submit to the Village Forester for approval all proposed plans, specifications and contract documents for all street trees before authorization for construction will be given. Design and installation shall conform to Sec. 18.08(14) of the Municipal Code and the Village of Germantown Comprehensive Tree Plan. All such documents shall be prepared in accordance with state and local standards by a Landscape Architect registered in the State of Wisconsin and submitted stamped and signed for review by the Village Forester and by all applicable governmental agencies. Implicit in this provision is the right of the Village Forester to require document revisions and modifications solely to the extent necessary to make the Public Improvements compliant with applicable law. The Developer shall warranty all street trees, including trees replaced under this warranty, for a period of two (2) growing seasons as required under Sec 18.08(14) of the Municipal Code. Work-in-right-of-way permits shall be applied for by Developer and secured from the Village Engineering Department. All street trees related to the Subdivision that will be transferred Page 18 of 84 12 to the Village shall be inspected by Engineering Department and Highway Department personnel prior to acceptance by the Public Works & Highway Committee. 1.14 STREET LIGHTS AND YARD LIGHTS. With each Phase, Developer shall design and submit to the Village Engineer for approval all proposed plans, specifications and contract documents for street lamps and to the Zoning Administrator for approval of proposed plans, specifications and contract documents for yard lights before authorization for construction will be given. Design and installation shall conform to Sec. 18.08(12) of the Municipal Code. All such documents shall be prepared in accordance with state and local standards by a Professional Engineer registered in the State of Wisconsin and submitted stamped and signed for review by the Village Engineer and by all applicable governmental agencies. Implicit in this provision is the right of the Village Engineer and Building Inspector to require document revisions and modifications solely to the extent necessary to make the Public Improvements compliant with applicable law. (1) Developer shall be required to provide street lights in accordance with Section 18.08(12) of the Municipal Code and the Village of Germantown Development Handbook 5.4.1. Said street lights shall be of a design approved by the Village Engineering Department and furnished and installed by Developer within the Development and all costs for the furnishing and installation of such street lights shall be borne by Developer. Street lights shall be LED. Lights and Installation to be completed by We-energies. (2) Street lights to be owned and maintained by WE Energies. 1.15 CLUSTER MAILBOXES. With each Phase, the Developer shall install cluster mailbox site(s) at a location(s) determined by the Developer and approved by the Village Engineer and the USPS. Mailbox sites shall not interfere with winter snowplow operations. Cluster Mailbox locations shall be included on final plans. 1.16 SURVEY MONUMENTS. The Developer shall install survey monuments placed in accordance with Sections 18.02(4)(c) and 18.08(1) of the Municipal Code, and the Village of Germantown Development Handbook Section 7.4, not later than one year (12 months) after the acceptance of this Agreement. Notwithstanding the foregoing, all monumenting interior to the Subdivision may be deferred for a reasonable time, not to exceed two (2) years after the recording of the Final Plat. The financial guarantee set forth in Article VI below includes the per lot sum required as a financial guarantee that such monuments will be placed within the time required. Developer understands that no occupancy permits shall be issued prior to the required monumenting. ARTICLE II - CONSTRUCTION 2.01 GENERALLY. Developer, entirely at its own expense, shall construct and install all Public Improvements and provide all plans, specifications and other documents in accordance with Sec. 18.09 of the Municipal Code or as required by the Village Engineer pursuant to Sec. 18.09. Developer understands and acknowledges that the Municipal Code may be and is subject Page 19 of 84 13 to revision from time to time, and that such revisions may impose altered or additional obligations on individual and entities creating subdivisions and other developments in the Village, including Developer, provided, however, that any revisions and modifications requested by the Village are requested solely to the extent necessary to make the Public Improvements compliant with applicable law. (1) Developer shall provide a schedule of construction setting forth approximate dates of commencement and completion of each Phase of the Development. (2) A pre-construction meeting shall be scheduled between Developer, the Contractors and the Village prior to commencement of any construction on the Public Improvements. Developer shall, prior to such meeting, notify all utilities of the planned construction and the date and location of the pre-construction meeting. 2.02 BUILDING AND OCCUPANCY PERMITS. No building permits, other than early model building permits, shall be issued by the Village for any construction within the Subdivision until all roads, sidewalks, water main, sanitary sewer, storm sewer, survey monuments, and all other improvements required in any given Phase of the Development are substantially completed in accordance with Chapter 236 of the Wisconsin Statutes. Consistent with Chapter 236 of the Wisconsin Statutes, upon such substantial completion, any outstanding building permits for home sites within such Phase that meet the requirements of applicable building codes, zoning ordinances, and other municipal regulations shall be released and shall not be withheld solely because of the status of the Public Improvements, including the status of inspection, approval, receipt of record- drawings, or acceptance by the Public Works & Highway Committee. Notwithstanding the foregoing, and notwithstanding any provision of this Agreement to the contrary (including without limitation Paragraph 1.05), the Village shall issue up to three (3) building permits for model homes prior to completion, surfacing, or acceptance of all roads, sidewalks, water main, sanitary sewer, storm sewer, and all other improvements required in any given Phase, provided that: (i) all underground utilities serving such model homes (including water, sanitary sewer, and storm sewer) are installed, tested, and operational; and (ii) all other applicable zoning, building, and code requirements unrelated to street completion are satisfied. The absence of final street grading, surfacing, or acceptance shall not, by itself, constitute grounds for denial of building permits for such model homes. Occupancy Permits will not be issued for the model homes until such time that all requirements for occupancy as stated above are satisfied and the Final Plat is recorded. In an effort to expedite the issuance of building permits for non-model residential lots, the Village agrees to work cooperatively with Developer, in accordance with the Municipal Code and the Village’s standard review practices, to review and approve a set of master architectural plans covering the anticipated styles and elevations of homes to be constructed within the Subdivision. Following approval of such master architectural plans, individual building permit applications for homes substantially conforming to the approved master plans may be reviewed on an expedited basis, subject to compliance with all applicable zoning, building, and code requirements. Page 20 of 84 14 2.03 REQUIRED PLANS. Developer shall submit to the Village Engineer for approval all of the plans, profiles and specifications required by Sec. 18.09(3) of the Municipal Code. Required plans for improvements shall include the following: (i) Grading plans, including interim and final, include cluster mailbox site locations; (ii) Erosion & sediment control plans, including interim and final; (iii) Private utility plans and capacity computations, including sanitary sewer & laterals, water main & laterals, and storm sewer & laterals; (iv) Public utility plans, profiles and capacity computations, including sanitary sewer & laterals, water main & laterals, and storm sewer & laterals; (v) Paving plans & profiles, including public roads, curb-and-gutter, road entrance intersections of “Street L” at Lannon Road (CTH Y) and “Street D” and “Street E” County Line Road (CTH Q), and sidewalk/path extensions from the intersection (CTH Y) and County Line Road (CTH Q) east to the proposed paved sidewalk along “Street D”. (vi) Storm water management plan; (vii) Landscape plans; (viii) Sign Plans; and (ix) Lighting plan. In addition, Developer shall submit to the Village Engineer for approval all specifications before authorization for construction will be given. Implicit in this provision is the right of the Village Engineer to require document revisions and modifications solely to the extent necessary to make the Public Improvements compliant with applicable law. 2.04 EXISTING FLORA. Developer shall, in accordance with Sec. 18.09(5) of the Municipal Code, make commercially reasonable efforts to protect and retain all existing trees, shrubbery, vines and grasses not actually lying within public roadways, drainage-ways, building foundation sites, private driveways and parking areas, soil absorption waste and disposal areas, paths and trails, except as necessary for implementation of the Development Plan and except for any nuisance or invasive vegetation. Such trees are to be protected and preserved during construction in accordance with sound conservation practices, including the preservation of trees by use of wells or islands or retaining walls whenever abutting grades are altered. Page 21 of 84 15 2.05 RECORD DRAWING DOCUMENTS. Developer shall, not later than sixty (60) days following Final Acceptance of the Public Improvements, provide the Village with draft record-drawing documents as outlined in Section 6.3 of the Village of Germantown Development Handbook in digital format using the latest version of AutoCAD and PDF. Final record-drawings shall be submitted on non-fading, Copy Tough media and digitally using the latest version of AutoCAD and PDF. Drawings shall include both Plan & Profile view. Record drawings shall include all public and private utilities including water main, sanitary sewer, storm sewer, pond outlet structure(s), emergency overflow area, sign plan and street lighting. GPS location of all pertinent items such as but not limited to pipe fittings, valves, hydrants, laterals, manholes, inlets, outfalls, street lighting (public) and traffic signs shall be provided to the Village. Reproducible copies of all final plans supplied by Developer to the Village pursuant to Sec. 18.09(3) of the Municipal Code shall include record-drawing information for all public and private improvements. All record-drawing measurements shall include horizontal and vertical location referenced to the Village coordinate system (Wisconsin State Plane Coordinate System, South Zone, based on North American Datum of 1983 (NAD 1983) and profiles in NAVD 1988. Each original or copy shall be certified by Developer's engineer and/or architect, in accordance with requirements of the Village Engineering Department. Record drawings shall be submitted by Developer before applying for a Village occupancy permit. ARTICLE III - DEDICATION AND ACCEPTANCE Developer agrees that the Public Improvements will not be accepted by the Village until: (i) all outstanding charges actually due and owing by Developer under the Ordinances have been paid in full, (ii) affidavits and lien waivers are received by the Village indicating that all contractors providing work, services or materials in connection with the Public Improvements on that Phase of the Development, have been paid in full for all such work, services and materials, and (iii) the Village has received evidence satisfactory to it that no liens or other encumbrances (except those approved in writing by the Village) encumber the Public Improvements. Any water main installation shall not be accepted until two (2) consecutive bacteriological safe samples have satisfactorily pass and one pressure test has successfully passed. Developer or his Contractor shall flush the main and obtain the samples required for this testing under the supervision of the Village Public Works Engineering or Water Utility. Upon completion of the water mains and service laterals and acceptance of the system by the Village Public Works & Highway Committee, ownership and control shall be turned over without reservation to the Village. With each Phase, Developer shall request in writing to the Village Engineer acceptance of the Public Improvements. The Village Engineer will order an inspection of the Public Improvements by Village Public Works, Highway, Engineering, Water Utility, and/or Wastewater Utility (as applicable), and a punch-list of corrections (if needed) shall be forwarded to Developer as part of such inspection. The Village agrees to complete the inspection of the Public Improvements within thirty (30) days from Developer’s request. When such applicable Public Improvements, and punch-list of corrections (if any) of same are completed, such Public Page 22 of 84 16 Improvements shall be formally accepted by the Public Works and Highways Committee. As long as the Public Improvements have been constructed in the manner required herein, and Developer has provided all required documentation for acceptance as required under this Agreement, the Village agrees to complete the acceptance of the Public Improvements within sixty (60) days (the "Final Acceptance"). The Final Acceptance of the Public Improvements for each Phase by the Public Works & Highway Committee shall commence running of the one-year warranty period provided for and in accordance with Paragraph 7.01 of this Agreement. ARTICLE IV - PAYMENT OF FEES 4.01 GENERALLY. Developer shall pay all fees, expenses, costs and disbursements which Developer is required to pay, pursuant to Sec. 18.10 of the Municipal Code. Unless required to be pre-paid under the terms of this Agreement or the Village Code, such amount shall be paid by Developer within thirty (30) days after being billed by the Village. 4.02 IMPACT FEES. As a condition of the approval of this Agreement by the Village, Developer shall, at the time of Building Permit issuance, pay to the Village Treasurer impact fees that have been determined in accordance with Sec. 3.14 of the Municipal Code. These fees include: (i) Water: ($1,003.00/residential unit equivalent) (ii) Parks: ($1,311.00/residential unit) (iii) Fire: ($171.00/residential unit) (iv) Police: ($148.00/residential unit) (vi) Library: ($711.00/residential unit) 4.03 SEWER CONNECTION FEE. Developer shall, at the time of Building Permit issuance, pay a sewer connection fee at a rate of $5,244.00/residential unit equivalent in accordance with Section 15.07(2) of the Municipal Code and Resolution No. 27-07, establishing the sewer connection charge. 4.04 IMPROVEMENT REVIEW FEE. Developer shall pay a fee based on the cost of required Public Improvements for all Phases of the Development to cover the cost of the Village for checking and reviewing plan and specification documents. Such improvement review fee shall be as provided by Sec. 18.10(3) of the Municipal Code. The fee shall be calculated as follows: (i) 2.25% of the first $250,000 of construction costs; plus (ii) 1.75% of the next $250,000 of construction costs; plus (iii) 1.25% of construction costs which exceed $500,000. Page 23 of 84 17 The fee may be recomputed, upon demand of the Village Engineer or Developer, after completion of Public Improvement construction in accordance with the actual cost of such improvements and the difference, if any, shall be remitted to the Developer. Evidence of cost shall be in such detail and form as required by the Village Engineer. 4.05 PROFESSIONAL FEES AND INSPECTION FEES. In accordance with Sec. 18.10(4), 18.10(7), and 18.10(8) of the Municipal Code, Developer shall be responsible for all professional (technical and legal) fees incurred by the Village in connection with this Development. Inspection costs shall be reimbursed to Village by Developer, whether performed by the Village Engineering Department, Water Utility, Wastewater Utility, Highway Department, or outsourced to a third-party engineering consultant, and shall also be reimbursed for services rendered by the Village Attorney. Developer will be billed for Village personnel at the standard rates presented in Exhibit C. Developer will be billed for third-party engineering consultants by presenting their invoices. A minimum $5,000 Developer’s Agreement fee pursuant to Section 18.10(3) of the Municipal Code. 4.06 DATA CONVERSION FEE. In accordance with Section 18.10(13) of the Municipal Code, Developer shall be responsible for all fees associated with the upload of Geographic Information System data incurred by the Village in connection with this project. 4.07 PREPAYMENT OF CERTAIN FEES. Developer, and/or a lot owner in the case of impact fees, shall pay the fees specified above that are due and owning prior to the issuance of any building permit for the Property. ARTICLE V - SPECIAL PROVISIONS 5.01 SEWER CONNECTIONS. In accordance with the rules and regulations of the Village, Developer has been authorized one (1) sewer connection for this Development, subject to the provisions of Paragraph 5.02 of this Agreement. 5.02 SEWER CAPACITY. It is understood by and between the parties that the Village, by entering into this Agreement, makes no representations or guarantees with respect to sewer capacity for the Development contemplated by this Agreement. It is understood by Developer that other governmental authorities having jurisdiction may impose limitations or restrictions upon the Village's decision to authorize the sewer connections referred to in Paragraph 5.01 of this Agreement. 5.03 WETLAND AND FLOODPLAIN CONDITIONS. It shall be an explicit condition that Developer shall comply with all required regulations and shall obtain all necessary approvals in writing from the appropriate agencies relative to the wetlands and floodplain areas which may be on the Property. Approval of the subject Development Plan by the Village Plan Commission shall not be construed to be Village approval of intrusions into wetland or floodplain areas, or Village approval of filling or modifications to wetlands or floodplain areas. Developer, except as Page 24 of 84 18 required on approved plans, will not be allowed to grade, fill, or conduct any other type of development within 75 feet of the high water mark of a navigable waterway or 25 feet from a wetland. If the Zoning Administrator suspects the presence of wetlands or navigable stream upon site inspection, an updated delineation will be required. Final delineation of wetlands and navigable streams shall be confirmed by SEWRPC. 5.04 PHASES. Developer has represented that it intends to construct the Development in five (5) separate Phases (each, a “Phase”). Developer shall provide a schedule of phasing for the initial Phase, and an updated schedule for each subsequent Phase, together with a corresponding exhibit depicting the work limits for that Phase. Except as otherwise expressly stated in this Agreement, Developer shall have no obligation or duty to commence, complete, or construct any improvements, including any Public Improvements, for any Phase other than the Phase for which Developer has obtained permits and is actively undertaking construction (the "Current Phase"). Nothing in this Agreement shall be construed to require Developer to complete, or to commit to completing, any future Phase, nor to install any Public Improvements associated with any Phase other than the Current Phase with the exception of the Advance Site Work identified on Exhibit F, which shall be completed as part of Phase I. All Public Improvements associated with the Current Phase shall be completed within one (1) year following the date of issuance of permits for such Public Improvements by the Village, subject to extensions expressly permitted under this Agreement. 5.05 FINAL PLAT. Developer may seek final plat approval for each Phase described in Paragraph 5.04 above. Final plat approval shall not be granted for any Phase until Developer has installed, and Village has accepted, all Public Improvements reasonably necessary for that Phase. If requested by the Developer, Village shall grant final plat approval for any Phase upon receipt from Developer of a letter of credit in the amount of 120% of the estimated total cost to complete any required Public Improvements that have not been completed. ARTICLE VI - FINANCIAL GUARANTY 6.01 AMOUNT. Developer shall deposit with the Village a financial guarantee (certified check, irrevocable letter of credit, or a Performance Bond at the option of the Developer) which shall assure the faithful performance of Developer's obligations under this Agreement for the Phase then being developed, as itemized in Exhibit D attached hereto and incorporated herein by reference. Notwithstanding any provision of this Agreement to the contrary, any bond, letter of credit, or other financial security required under this Agreement shall cover only the Public Improvements for the current Phase being completed, and Developer shall not be required to provide any bond or other financial security for any future Phases of the Development until such time as Developer commences development of such future Phase. Prior to any draw on the financial guarantee by the Village, the Village shall provide Developer with written notice specifying the nature and extent of the alleged default and Developer shall have thirty (30) days from receipt of such notice to cure such default; provided, however, that if such default cannot reasonably be cured within such 30-day period, Developer shall have such additional time as is reasonably necessary to cure such default, so long as Developer commences such cure within the Page 25 of 84 19 initial 30-day period and diligently pursues such cure to completion. Notwithstanding the foregoing, if the financial guarantee is scheduled to expire, terminate, or lapse before the expiration of the cure period described above, then the Village may shorten the cure period to the extent commercially reasonable and necessary to preserve its ability to draw on the financial guarantee and the Village shall provide Developer with written notice of such shortened cure period (which notice may be given concurrently with the notice of default). The Village may in its sole discretion following Developer’s request and acceptance by the Village Public Works & Highway Committee of some but not all of the improvements constructed as part of any Phase, reduce the deposit or letter of credit to the amount estimated by the Village Engineer (in a manner consistent with the Ordinances) to be necessary to secure performance by Developer for such Phase. In no event shall the amount of the guaranty be reduced below the aggregate total estimated cost of the Public Improvements for the current Phase not yet installed or accepted, plus fifteen percent (15%). The Village is hereby authorized to contact directly Developer's financial agent from time to time regarding the sufficiency of the financial guaranty. The termination date of the financial guaranty shall be no earlier than one (1) year following the date of substantial completion of the Public Improvements for the applicable Phase. If the Public Improvements to be undertaken by Developer under this Agreement for any Phase are not complete within fifteen (15) months following the issuance of permits for such work, for any reason including force majeure under Paragraph 8.03 below and without regard to the fault of Developer, then Developer’s obligation to provide a letter of credit for such Phase shall be extended through the completion of the work and its inspection and acceptance by the Village. After construction and total completion of each Phase and acceptance of the Phase by the Village Public Works & Highway Committee, the surety for such Phase will be reduced to 10% of the actual cost of construction for a period of one (1) year (the guaranty period). In the event the original surety would, by its terms, expire prior to the end of the one year guaranty period, or if the guaranty period is extended due to repairs of defects as provided in Paragraph 7.01, a new surety shall be issued to cover the remaining guaranty period for the 10% of actual original construction costs for such Phase. 6.02 FORM. The form of the financial guaranty shall be approved by the Village Attorney prior to acceptance of the letter of credit by the Village as satisfying Developer’s obligation as provided in Paragraph 6.01 above. 6.03 LIABILITY NOT RELEASED. All deposits, bonds or Letters of Credit given hereunder are security devices only which in no manner limit the liability of Developer to the Village, however arising and regardless of the amount. For clarity, Developer's liability under this Paragraph 6.03 shall be limited to the Phase for which such deposit or Letter of Credit was provided. 6.04 RESERVATION OF ASSESSMENT RIGHTS. In addition to the remedies for default provided to the Village by this financial guaranty, the Village reserves the right, following written notice to Developer and expiration of the applicable cure period set forth in Section 6.01 above, to impose special assessments or charges for any amounts to which it is specifically entitled by virtue of this Agreement for improvements specifically provided for herein upon the property described in Exhibit A attached hereto; provided, however, that such special assessments or Page 26 of 84 20 charges shall be limited to the actual, documented costs incurred by the Village and shall not include any punitive or consequential damages. Such special assessments or charges shall be collected on the next succeeding tax roll as are other special assessments or charges. This provision constitutes Developer's Waiver of Notice and Consent to all special assessment or special charges proceedings which may be required by law, subject to the notice and cure provisions set forth in Section 6.01. 6.05 REMEDIES. At the option of the Village, following written notice to Developer and expiration of the applicable cure period set forth in Section 6.01 above, a material breach of this Agreement shall result in the Village having the right to revoke any and all occupancy or use permits, or to rescind any zoning granted in consideration of the proposed project; provided, however, that the Village shall not exercise such remedies unless the breach remains uncured following the notice and cure period. Compliance with this Agreement shall be deemed a condition of any such zoning, which shall revert to the original zoning classification upon action of the Village Board under authority of this provision. As an alternative thereto, and at the option of the Village, the Village may impose a liquidated damage penalty in the amount of $500.00 per diem until such time as there shall be compliance; provided, however, that such liquidated damages shall not commence until expiration of the cure period set forth in Section 6.01 and shall not exceed, in the aggregate, the greater of (i) $50,000.00 or (ii) the amount of the financial guaranty then held by the Village for the applicable Phase. In addition, the Village shall have the right to remedy such breach at its expense and assess the actual, documented cost thereof against the subject property. All remedies as stated herein shall be deemed alternative remedies, and cumulative as and to such other remedies in law or equity as the Village may assert and herein reserves. ARTICLE VII - GUARANTEE AND INDEMNIFICATION 7.01 GUARANTEE OF IMPROVEMENTS. Developer shall guarantee all dedicated improvements against defects due to faulty materials or workmanship which appear within one (1) year from the date of Final Acceptance by the Village, as provided in Article III of this Agreement. Developer shall repair or replace any such improvements as required by the Village Engineer to eliminate such defects and shall pay for all damages to Village property resulting from such defects. Each repair or replacement performed pursuant to this paragraph shall be guaranteed for one (1) year from the completion thereof. 7.02 GENERAL INDEMNIFICATION. Developer shall indemnify and hold the Village harmless against and from any and all liability, judgments, costs and expenses incurred by the Village as the result of any action by whomsoever or whenever brought or obtained against the Village or Developer, or both, to the extent resulting from or arising in the course of, out of, or as a result of the carelessness, negligence neglect, or intentional wrongdoing of Developer, its agents, contractors or employees. In every case where judgment is recovered against the Village and where notice of the pendency of the suit and an opportunity to defend the same has been given to Developer within ten (10) days after its commencement, the judgment shall be conclusive upon Developer, not only as to the amount of damages, but also as to its liability to the Village. Page 27 of 84 21 7.03 CONTRACTOR INSURANCE. Contractors engaged by Developer to perform the work required by this Agreement within public rights-of-way shall, prior to commencing such work, submit to the Village proof of the following: (i) Unemployment and Workers' Compensation insurance which is in strict compliance with state laws. (ii) Personal and public liability insurance having limits of not less than $1,000,000.00. (iii) Property damage insurance having limits of not less than $500,000.00. (iv) Fire and extended coverage which shall insure against losses and damage to completed work, materials or equipment until the same has been accepted by the Village. 7.04 INDEMNIFICATION FOR ENVIRONMENTAL CONTAMINATION: Developer shall indemnify, and hold the Village and its officers, agents and employees harmless from and against any and all losses, damages, costs, expenses, liabilities, obligations, claims or suits (including, without limitation, reasonable attorneys’ fees, punitive damages, fines, penalties and consequential damages) resulting from or relating in any way to the presence of toxic or hazardous material or substances present in or on the real property dedicated or conveyed to the Village, but only to the extent such toxic or hazardous material or substances were bought onto the real property by the acts, errors or omissions of the Developer during the time period upon which the Developer owned fee simple title to the Subdivision. For purposes of this Agreement, “toxic or hazardous material or substances” is defined as any pollutant, contaminant, waste or toxic or hazardous chemicals, wastes or substances, including, without limitation, asbestos, urea formaldehyde insulation, petroleum, PCBs, lead, air pollutants, water pollutants, soil pollutants and other substances defined as hazardous or toxic or words of similar import under federal, state or local statute, rule, regulation or order of any government entity having jurisdiction over the control of such wastes or substances. Upon the Village becoming aware of the occurrences of any event or the existence of any state of facts in respect of which the Village has or will have a claim for indemnification under this Paragraph 7.04 (“Claim”), as soon as reasonably practicable thereafter: (a) the Village shall provide Developer notice of the losses, damages, costs, expenses, liabilities, obligations, claims or suits (including, without limitation, reasonable attorney’s fees, punitive damages, fines, penalties, and consequential damages) as and when reasonably apprehended. Notwithstanding anything to the contrary contained herein, the Village’s failure to timely notify Developer shall not prevent or in any way impair recovery by the Village unless Developer is materially prejudiced as a result of such failure; Page 28 of 84 22 (b) subject to paragraphs (c) through (f) below, Developer diligently, at its own expense, shall control and shall be responsible for the defense, negotiation and/or settlement of the Claim, including the diligent performance of any remediation associated therewith; (c) the Village may at its own expense hire counsel or consultants to monitor the Claim; (d) Developer shall not, without the prior written consent of the Village, which consent shall not be unreasonably delayed, withheld or conditioned, settle any Claim; (e) Developer shall lose its right to defend, negotiate and settle any Claim if, in the reasonable judgment of the Village, it materially fails to diligently defend, negotiate or settle such Claim and such failure continues for ten (10) days after written notice from the Village. In the event that Developer has lost its right to defend, negotiate or settle any Claim: (i) the Village shall have the right, without prejudice to its right of indemnification hereunder, at Developer’s cost and expense, to defend, negotiate and settle any Claim, and (ii) Developer shall pay such reasonable costs and expenses incurred by the Village within twenty (20) days of receipt of written notice from the Village. The Village shall at all times have the right to engage its own separate counsel and consultants in connection with any Claim; provided, however, that unless Developer has materially failed to defend such Claim as described in this paragraph (e) or paragraph (f) below, the fees and expenses of such separate counsel and consultants shall be borne solely by the Village and Developer shall have no obligation to reimburse the Village for the same; and (f) If Developer does not timely assume responsibility for any Claim, the Village shall have the right, without prejudice to its right of indemnification hereunder, at the sole cost and expense of Developer, to assume control of the defense, negotiation and/or settlement of the Claim, and may engage counsel or other agents, consultants, and contractors to contest, defend, settle or otherwise dispose of such Claim, including, without limitation, hiring any environmental consultant or contractor to perform any remediation necessary to address the Property or the toxic or hazardous materials or substances at the Property. For purposes of this Paragraph 7.04, Developer’s failure to timely assume responsibility for a Claim shall constitute a material failure to defend such Claim. ARTICLE VIII - TIME OF COMPLETION 8.01 COMPLETION DATE. The work required by this Agreement for each Phase shall be completed by Developer not later than fifteen (15) months after the date of issuance of permits for such Phase by the Village, subject to extensions expressly permitted under this Agreement, including without limitation Paragraph 8.03 (Force Majeure). For the avoidance of doubt, the completion timeline set forth in Paragraph 5.04 shall govern the completion of Public Improvements for each Phase. Page 29 of 84 23 8.02 DEFAULT. In the event Developer does not complete installation of the public improvements required by this Agreement within thirty (30) days after the Village has served written notice of default upon Developer specifying in reasonable detail the nature of such default, the Village may complete the same and take title thereto; provided, however, that if such default cannot reasonably be cured within such 30-day period, Developer shall have such additional time as is reasonably necessary to cure such default, so long as Developer commences such cure within the initial 30-day period and diligently pursues such cure to completion. The costs of doing such work shall be limited to the actual, reasonable, and documented costs incurred by the Village and shall be collected as provided in Article VI of this Agreement. 8.03 FORCE MAJEURE. Notwithstanding anything herein to the contrary, in the event that Developer is delayed or hindered in or prevented from the performance of any act required hereunder by reason of strikes, lockouts, labor troubles, inability to procure materials, failure of power, restrictive governmental regulations, orders or decrees, riots, insurrection, war, acts of God, inclement weather, or other reasons beyond Developer’s reasonable control, then performance of such act shall be excused for the period of the delay and the period for the performance of any such act shall be extended for the period of such delay. 8.04 SUNSET CLAUSE. The conditions of this Agreement shall terminate fifteen (15) months after Village Board approval unless construction on Phase I has begun or this Agreement is amended in writing by both parties. ARTICLE IX - GENERAL PROVISIONS 9.01 PLATTING REGULATIONS. All provisions of the Village's subdivision and platting code as set forth in Chapter 18 of the Municipal Code of the Village which are not inconsistent with or in conflict with any of the provisions of this Agreement are incorporated herein by reference and all such provisions shall bind the parties hereto and be a part of this Agreement as fully as if set forth herein. This Agreement, shall be performed and carried out in strict compliance with and subject to the provisions of Chapter 18. 9.02 APPROVAL TERMS. The approvals granted by the Village for the Developer, are conditioned upon the fact that the Developer’s use is not tax-exempt and shall be subject to general property taxation; No tax-exempt use is authorized by the aforesaid approvals. 9.03 AGREEMENT FOR BENEFIT OF PURCHASER. Developer agrees that in addition to the Village's rights herein, the provisions of this Agreement shall be for the benefit of the purchaser of any dwelling unit, building, lot or parcel of land within the Development. 9.04 ENTIRE AGREEMENT. This written Agreement and written amendments and any referenced attachments thereto shall constitute the entire agreement between the Developer and the Village. 9.05 AMENDMENTS. This Agreement may be amended or modified only by an Page 30 of 84 24 instrument in writing executed by all of the parties to this Agreement. 9.06 OWNERSHIP. Developer certifies and warrants to the Village that all of the owners of the real estate within said Development and all of the land contract vendors and/or mortgagees having interest in said real estate are as follows: Home Path Financial Limited Partnership 9.07 AUTHORITY. Developer, by the undersigned, represents, certifies and warrants that the undersigned has the authority to bind Home Path Financial Limited Partnership 9.08 NO VESTED RIGHTS GRANTED. Except as expressly provided by law or as expressly provided by this Agreement, no vested rights in connection with this Development shall inure to the Developer, its heirs, successors or assigns. 9.09 NO WAIVER. No waiver of any provision of this Agreement shall be deemed to constitute a waiver of any other provision, nor shall it be deemed or constitute a continuing waiver unless expressly provided for by a duly signed and executed, written amendment by all parties to this Agreement. The Village's failure to act or exercise any right under this Agreement shall not constitute the approval or a waiver of its right to act or exercise any right under this Agreement or a ratification of any wrongful or negligent act by the Developer or the acceptance of any improvement or performance on the part of the Developer. 9.10 APPROVAL. No approval by the Village Engineer or the Village attorney or any other person acting on behalf of the Village shall be construed as a waiver of any of the requirements of the Ordinances, or any statute or regulation governing the improvements. 9.11 COVENANTS AND DEED RESTRICTIONS. All proposed covenants and deed restrictions shall be submitted to and be approved by the Village Attorney prior to recording, and shall include the following: (1) ELEVATIONS. A requirement that the lot owner set the final yard grade, building elevations and contours subject to the approval of the Villages Building Inspector and Engineer prior to construction. The lot owner shall also ensure that the lot is graded in accordance with such approval. (2) YARD LIGHTS. A requirement that the lot owners install a front yard light that is in conformance with § 18.08(12) of the Municipal Code subject to the approval of the Village Engineer. (3) LANDSCAPING. A requirement that each individual lot owner is responsible for installing the minimum landscaping required under § 17.43(5) of the Municipal Code. (4) OWNER RESPONSIBILITY. A requirement that one or more homeowners associations are created, each comprised of the lot owners within the portion of the Development Page 31 of 84 25 served by the applicable improvements, for purposes of assuming the perpetual maintenance of the subject improvements including, but are not limited to: (i) Private storm system - privately owned storm water management basins, storm sewer, ditches, and swales on private property. (ii) Private sanitary - system. Maintenance, repair and replacement of private sanitary systems including the private lift station(s) and private force main(s) and appurtenances. (iii) Private Roads. Maintenance, repair and replacement of private roads and lanes. (iv) Signs. Maintenance, repair and replacement of private street signage, such as the monument entrance sign(s) and commonly owned outlots and open spaces. (v) Outlots. Common area/open space (i.e. internal/central park and walking paths). (vi) The Developer shall establish covenants and restrictions requiring the applicable homeowners association to create a capital reserve account to ensure proper financial resources for the maintenance, repair and replacement of private facilities. The Developer shall submit a lifecycle maintenance and replacement plan for these private facilities to the Village Engineer for approval. Following approval, that analysis will become an appendix to this Agreement. (vii) The Developer shall maintain the public streets until the streets are dedicated and accepted by the Village Board. Village agrees to accept improvements by phase. Snow removal and ice control will be the responsibility of the Developer and/or the applicable homeowners association prior to acceptance by the Village. Snow removal and ice control of the public streets shall be the responsibility of the Village following acceptance by the Village at the Public Works and Highways Committee. Snow removal and ice control of the sidewalks shall be the responsibility of the respective owners, as outlined in the ordinance. (viii) The Developer shall maintain the private roads until they are transferred to the applicable homeowners association. Snow removal and ice control on private roads shall not be the responsibility of the Village. Snow removal and ice control of the private roads shall be the responsibility of the Developer and/or the applicable homeowners association. (ix) Properties to be served by the Developer’s proposed private lift station shall be informed by the Developer of these financial lift station requirements in writing and shall obtain and retain on file a written acknowledgement from the Page 32 of 84 26 purchaser. (5) VILLAGE REMEDIES. The Village shall have the right to remedy deficiencies under the preceding paragraphs, the right to charge Developer, or the applicable homeowners association after responsibility has been transferred by the Developer under this Agreement, for costs incurred and the right to enforce collection of such amounts in accordance with § 66.0627 of the Wisconsin Statutes. In the event that the applicable homeowners association ceases to exist or is otherwise unable to undertake its responsibilities under this Agreement, the Village shall have the right to enforce this Agreement against the individual lot owners jointly and severally. (6) ENVIRONMENTAL. A requirement that the wetland, contained within Outlot #4, depicted on the Plat is to be preserved and protected from development and any uses or activities that would damage or destroy the natural resource features, wildlife and associated habitat therein, including but not limited to, the unnecessary removal of trees or other vegetation, the use of motorized vehicles, recreational hunting, etc. 9.12 SEVERABILITY. If any part, term or provision of this Agreement is held by a court to be illegal or otherwise unenforceable, such illegality or unenforceability shall not affect the validity of any other part, term or provision; and the right of the parties will be construed as if the part, term or provision was never part of the Agreement. ARTICLE X - NON-ASSIGNMENT This Agreement, which is binding upon Developer, Developer's agents, officers, employees, personal representatives, guardians and trustees shall not be assigned by Developer to any individual, firm, partnership or corporation without the express approval of the Village. (Signatures appear on the following pages). Page 33 of 84 27 IN WITNESS WHEREOF, Developer and the Village have caused this Agreement to be signed in duplicate originals this day of , 2026 which shall be the effective date of this Agreement (“Effective Date”). HOME PATH FINANCIAL By: ______________________________ Kenneth Frank , General Partner STATE OF WISCONSIN ) ) SS COUNTY ) Personally came before me this ____ day of ________________, 2026, the above-named, Kenneth Frank, to me known to be the person who executed the foregoing instrument and to me known to be such General Partner of HOME PATH FINANCIAL, and acknowledged that he executed the foregoing instrument in such capacity. By: __________________________ Print Name: ____________________ Notary Public, State of Wisconsin My Commission Expires: Page 34 of 84 28 VILLAGE OF GERMANTOWN By_____________________________ Robert A. Soderberg, Village President By_____________________________ Donna Ott , Village Clerk Per Village Board Approval: Dated_____________ STATE OF WISCONSIN ) ) SS WASHINGTON COUNTY ) Personally, came before me this ____ day of ________________, 2026, the above-named, Robert A. Soderberg, Village President, and Donna Ott, Village Clerk, to me known to be the persons who executed the foregoing instrument and to me known to be the persons who executed the foregoing instrument in such capacity and acknowledged the same. By_______________________ Print Name: ________________ Notary Public, State of Wisconsin My Commission Expires: Approved as to form: ______________________________ Brian C. Sajdak, Village Attorney This instrument was drafted by the Village of Germantown. Page 35 of 84 29 EXHIBIT A LEGAL DESCRIPTION OF THE PROPERTY That part of the Northwest Quarter of the SOUTHWEST Quarter (NW ¼ SW ¼) and part of the Southwest Quarter of the SOUTHWEST Quarter (SW ¼ SW ¼) and part of the Southeast Quarter of the SOUTHWEST Quarter (SE ¼ SW ¼) of Section Thirty-two (32), Town Nine (9) North, Range Twenty (20) East, Village of Germantown, Washington County, Wisconsin, bounded and described as follows: Commencing at the South ¼ corner of said Section 32; thence North 01° 24' 32" West along the East line of the Southwest ¼ of said Section 32 (recorded as North 01° 25' 14" West), 219.222 feet to an existing 1-inch I.P., said point being the point of beginning of lands to be described; thence continuing North 01° 24' 32" West along said East line, 1114.738 feet to a set 1-inch I.P.; thence South 89° 35' 56" West, 1325.809 feet to a set 1-inch I.P.; thence North 00° 22' 09" West, 665.595 feet to an existing "X" in a rock; thence South 89° 35' 36" West, 1294.485 feet to an existing 1-inch I.P., said point also being on the Easterly R.O.W. line of C.T.H. "Y" (Lannon Road); thence South 01° 30' 31" East along said R.O.W. line, 1440.115 feet to a set 1-inch I.P.; thence along the arc of a curve, 234.733 feet (chord bearing of South 12° 14' 10" East, 233.364 feet) to a set 1-inch I.P.; thence South 22° 57' 49" East, 175.906 feet to a set 1-inch I.P.; thence along the arc of a curve, 86.957 feet (chord bearing of South 16° 55' 14" East, 86.796 feet) to a set 1- inch I.P.; thence South 64° 49' 42" East, 76.644 feet to a set 1-inch I.P., said point being on the Northerly R.O.W. line of C.T.H. "Q" (County Line Road); thence North 89° 38' 57" East along said R.O.W. line, 1149.251 feet to a set 1- inch I.P.; thence North 00° 21' 03" West, 364.030 feet to an existing 1-inch I.P.; thence North 89° 38' 57" East, 143.400 feet to a set 1-inch I.P.; thence South 00° 21' 03" East, 77.870 feet to a set 1-inch I.P.; thence South 89° 23' 34" East, 170.370 feet to an existing 1-inch I.P.; thence South 00° 54' 50" East, 283.325 feet to a set 1-inch I.P, said point being on the Northerly R.O.W. of C.T.H. "Q" (County Line Road); thence North 89° 38' 57" East along said R.O.W., 28.604 feet to a set 1-inch I.P.; thence North 00° 21' 03" West, 170.000 feet to a set 1-inch I.P.; thence North 89° 38' 57" East, 110.000 feet to a set 1-inch I.P.; thence South 00° 21' 03" East, 170.000 feet to a set 1-inch I.P., said point also being on the Northerly R.O.W. line of C.T.H. "Q" (County Line Road); thence North 89° 38' 57" East along said R.O.W., 702.830 feet to a point on the North R.O.W. of said C.T.H. "Q" (County Line Road); thence North 01° 29' 35" West, 169.186 feet to an existing 1-inch I.P.; thence North 89° 38' 01" East, 110.080 feet to the point of beginning, EXCEPTING THEREFROM Three (3) parcels of land, described as follows: 1. That portion described by Trustee's Deeds recorded as Document No’s 440169, 440170 and 440171. 2. That portion contained in Award of Damages recorded on April 29, 2005, as Document No. 1086250. 3. That portion contained in Conveyance recorded on December 27, 1938, as Document No. 168138. Page 36 of 84 30 For Information Only: Tax Key Nos.: GTNV 323995 and GTNV 323986 and GTNV 323987 EXHIBIT B PRELIMINARY PLAT (See Attached) Page 37 of 84 31 EXHIBIT C LABOR & EQUIPMENT RATES (See Attached) Page 38 of 84 32 EXHIBIT D FINANCIALS (See Attached) Page 39 of 84 33 EXHIBIT E APPROVED DEVELOPMENT PLAN (See Attached) Page 40 of 84 MBF\217844\0033\55254378.v1-10/22/26 34 EXHIBIT F ADVANCE SITE WORK [To be completed: list of specific improvements and site work items to be completed as part of Phase I.] Page 41 of 84 BUSINESS OF THE PUBLIC WORKS & HIGHWAYS COMMITTEE MEETING DATE: November 4, 2026 PLACEMENT: Action Item ITEM TITLE: A Resolution Terminating the Use of Additive Fluoride in the Germantown Public Water System. (ACTION) SUBMITTED BY: Paul Haugen, Water Superintendent SUMMARY EXPLANATION: 1. This will provide a significant cost savings to the Village. 2. Our natural occurring Fluoride is.48mg/L. By adding Fluoride, the level must be maintained between .60-.80mg/L. 3. By removing Fluoride, it will provide a safer work environment for staff and greater safety for the public. Attachments: 1. Item: Breakdown of annual operating cost 2. Item: Historical data, other well communities that removed Fluoride. 3. DNR email regarding no other testing requirements to remove. 4. MSDS ATTACHMENT: 1. DNR response to removing Fluoride 2. Fluoride info-Cost 3. Fluoride info 4. MSDS 5. Resolution Terminating Fluoride in Water System STAFF RECOMMENDATION: Move to recommend removal of all Fluoride Chemicals, pumps and ancillary equipment used to add Fluoride to the Village of Germantown water system. ACTION BY COMMITTEE: Page 42 of 84 Page 43 of 84 Page 44 of 84 Cost associated with adding Fluoride As of 2026 Material and Equipment Annual Cost 1. Fluoride pump maintenance $1,500.00 Hoses, tubing, shafts and rollers 2. Analyzer maintenance- Hoses, reagents, membranes $2,400.00 3. AcuvacVac Ampules for daily testing $600.00 4. Liquid hydroFluosilicic acid Fluoride-9,128lbs(898gal) $6,268.04 5. Fluoride analyzer Annual cost-12yr life cycle $550.00 6. Chemical scales For Fluoride tank measurments-10yr life cycle $1,800.00 7. Fluoride pumps Fluoride injection-10yr life cycle $400.00 8. Electric heaters Four total out of six wells-4yr life cycle $500.00 8. New VFD Variable speed drive for motor-10yr life cycle $6,000.00 $10,000.00ea. 9. Misc labor for above $1,500.00 Subtotal: $21,518.04 Labor and testing 1. SCADA programing New scales and VFD $612.00 2. Daily testing $52.90x2hrsx2.5days/wkx4wks/12months Booster Station sample site $11,193.60 3. Testing when analizer goes out 4hrsx1.5x4wks Week-end testing $1,585.00 4. Flouride vents Vaccum pump on Fluoride tanks $720.00 (2) inservice-need to install (4) more 5. State testing and mailing costs Certified lab-Fed-X $720.00 Subtotal: $14,830.60 Combined cost of Material, Equipment, Total: $36,348.64 Testing and labor Page 45 of 84 C:\Users\VGT\Documents\Wells\Chemicals\Fluoridation\Fluoride info.xlsx Page 46 of 84 Germantown's raw water(naturlly occuring) fluoride level=.48mg/L If a community decided to add Fluoride the DNR required Fluoride level is-.60-.80mg/L WATER FLUORIDATION ACCIDENTS: FEBRUARY 1992 — Rice Lake: Residents vomiting. Centers for Disease Control state that 150 water consumers potentially at risk. A pump feed thought to have run for two days leads to fluoride levels as high as 20 ppm. The Wisconsin State Dental Director states, “To be harmful, exposure would have to have been about 225 ppm.” This statement is incorrect, as serious adverse symptoms have been reported as low as 50 ppm, and death has occurred at 150 ppm. (SOURCE: Carton 1994) July 1992-Hooper Bay, Alaska: More than 260 villagers in Hooper Bay, Alaska — nearly 10 times more than previously reported — may have suffered fluoride poisoning in May after drinking water dangerous levels of the chemical, according to a new state study We found that following acute fluoride poisoning, symptoms and toxic serum levels persisted longer and toxicity occurred at lower doses than previously reported. (Source: NEWS TRIBUNE (Tacoma, WA) OCTOBER 1990 — Westby: Fluoride levels reach as high as 150 ppm after fluoridation malfunction. Four families suffer a week of diarrhea, upset stomach and burning throats. The water utility supervisor estimates the fluoride level to be ten times normal since it had burned his mouth. The elevated fluoride levels corrode the copper off the pipes in area homes, producing copper concentrations 70 times higher than the EPA recommended limit. (SOURCE: Carton 1994) Chemical hazards Hydrofluoric Acid is Highly reactive and corrosive. Concentration above 40% fume in the air is very toxic and fatal if inhaled, absorbed through the skin or swallowed(in some cases, death occurred in less than one hour after ingested). Corrosive to the eyes, skin, nose throat and respiratory tract. Effects maybe delayed. May cause blindness and permanent scarring. Skin absorption can cause irregular heartbeat, nausea, dizziness, vomiting and seizures. Page 47 of 84 WI. Communities that removed Fluoride Made phone contact Cascade, Wi-Population-699 Lonei-920-838-1176 2017-Just pulled it from the system-cost reasonses Luck, WI-Population 1,063 Seth Peterson-715-491-3424 Had to add Polyphosphate, which needed chlorine they did not want to keep both chemicals in the same room Cost and danger of chemical mixing. Plymouth, WI-Population 8,419 Brian E. Yerges-920-893-1471 The ask the question if it is needed and their neighbor Elkhart lake does not add, so it is not mandated by the state to add Fluoride They did the math and they save about $6,000/yr. Saukville, WI-Population 4,419 Dale-262-284-0545 Sold it as their natural occurring Fluoride was close to what was added. they did not want to add an acid to the water from fluoride-safety concern out way the benefit. Removed in 2016 Communities that removed fluoride Population size Date removed Hayward, WI 2,318 8/13/2018 Montello, WI 1,500 Feb-15 Shell Lake, WI 1,400 9/1/2014 Balsam Lake, WI 1,000 2/4/2013 St. Croix Falls, WI 2126 2/1/2013 Balsam Lake, WI 1,000 2/4/2013 Chippewa Falls, Wi 13,661 2/17/2009 (for the 2nd time) http://fluoridealert.org/researchers/states/wisconsin/ Fluoride MSDS Filtering Fluoride: Pitcher or faucet-mounted water filters do not alter fluoride content; the more-expensive reverse osmosis filters remove 65–95% of fluoride Some bottled waters contain undeclared fluoride, and distillation removes all fluoride which can be present naturally in source waters. Adobe Acrobat Document Page 48 of 84 Seastar Chemicals Inc MSDS – HYDROFLUORIC ACID Page 1 of 7 Material Safety Data Sheet HYDROFLUORIC ACID Print Date: September 2011 SECTION 1 – Chemical Product and Company Identification MSDS Name: HYDROFLUORIC ACID MSDS Preparation Date: 09-2011, Supersedes 07-2008, 02-2007, 02-2004, 02-2001 & 02-98 Synonyms: Fluohydric acid, fluoric acid, hydrofluoric acid solution. Chemical Names: DE Fluorwasserstoffsäure; ES Fluoruro de hidrógeno; FR Acide fluorhydrique; IT Acido fluoridrico; NL Fluorwaterstofzuur. UN / NA Number(s): UN1790 Formula: HF Molecular Wt: 20.01 Product Numbers: S010501, S020502, S010501-SSND13, S010501-SSNW03, S010501-SSNW04, S010501-SSNW61, S010501-SSNX43, S020502-SSNF07, S020502-SSNF08, S020502-SSNP 01, S020502-SSNP02, S020502-SSNP03, S020502-SSNP04, S020502-SSNP05, S020502- SSNP06, S040501-SSND12, S040501-SSND13, S040501-SSND14 Supplier: Seastar Chemicals Inc, 10005 McDonald Park Road, Sidney, BC V8L 5Y2 CANADA Tel: (250) 655-5880, Fax: (250) 655-5888 CANUTEC (CAN): (613)-996-6666 SECTION 2 – Composition/Information on Ingredients Chemical Name Percent CAS # EINECS/ELINCS Hydrofluoric acid 47-51% 7664-39-3 231-634-8 Water Balance 7732-18-5 231-791-2 SECTION 3 – Hazards Identification EMERGENCY OVERVIEW Appearance: Colourless liquid with a pungent, irritating, penetrating odour. Concentrations above 40% fume in air. Will not burn. Cylinders or tanks may rupture and explode if heated. Highly reactive. Contact with metals, such as iron or steel, slowly releases flammable and potentially explosive hydrogen gas. VERY TOXIC. May be fatal if inhaled, absorbed through the skin or swallowed. CORROSIVE to the nose, throat and respiratory tract. Causes lung injury-effects may be delayed. CORROSIVE to the eyes and skin. Causes severe burns. May cause blindness and permanent scarring. Absorbed fluoride can cause metabolic imbalances with irregular heartbeat, nausea, dizziness, vomiting and seizures. Long-term exposure may cause skeletal fluorosis (weakened bone structure). Target Organs: Lungs, teeth, eyes, skin, bone, mucous membranes. Potential Health Effects Primary Route(s) of Entry: Inhalation and ingestion. Skin contact. Eye contact. Skin absorption. Effects of Acute Exposure: May be fatal by ingestion, inhalation or skin absorption. Corrosive. Acute effects may be delayed. LD50/LC50: CAS# 7732-18-3: Oral, rat: LD50 = >90 mL/kg. CAS# 7664-39-3: Inhalation, mouse: LC50 = 342 ppm/1H. Inhalation, rat: LC50 = 1276 ppm/1H. Eyes: Direct contact with hydrofluoric acid can cause severe and irreversible corrosive injury with possible corneal scarring and bli ndness. The acid penetrates to deep tissue layers and causes severe corrosive injury. The gas can dissolve in the moisture on the surface, formi ng corrosive hydrofluoric acid. Irritation has been reported with exposure to concentrations as low as 0.24 ppm for 1 hour. Skin: May be fatal if absorbed through skin and penetration may continue for several days. Hydrofluoric acid is extremely corrosive a nd can cause very deep and excruciatingly painful burns and tissue loss. Burns from concentrated solutions (greater than 50%) are felt immediatel y and tissue destruction is readily apparent. Weaker solutions (20-50%) result in burns that are apparent after several hours. Burns from solutions of less than 20% may take up to 24 hours to become apparent. Weak solutions (less than 7%) penetrate deeply before causing tissue damage and surface involvement m ay be minimal. Burns are swollen, hot and painful, then develop white or yellowish areas and blistering, with deep ulceration and destruction of tis sue, which tends to heal slowly. The severity of the burns and absorption of the acid (with liquefaction necrosis of soft tissue and decalcification and corrosi on of the bone) have resulted in permanent scarring, disability and death. Ingestion: May be fatal if swallowed. Hydrofluoric acid is corrosive and can cause severe burning of the mouth, throat and stomach. Perfor ation of the digestive system may occur. Systemic fluoride toxicity has occurred following ingestion. Symptoms such as nausea, vomiting, abd ominal pain, reduced heartbeat and blood pressure, shortness of breath have been reported. In some cases, death occurred in less than one hour follo wing ingestion. Ingestion is not a typical route of occupational exposure. Page 49 of 84 Seastar Chemicals Inc MSDS – HYDROFLUORIC ACID Page 2 of 7 Inhalation: May be fatal if inhaled. Low concentrations (a few ppm) can cause irritation of the nose, throat, eyes and respiratory tract. Higher concentrations can cause severe burns to the throat, airways a nd lungs. Fluid accumulation in the lungs and irregular heartbeat has led to deaths within hours following inhalation and, in some cases, concurrent skin contact with unknown concentrations of HF. Within 24-48 hours, the victim may experience a rapidly worsening difficulty in breathing, accompanied by coughing. These symptoms are due to the development of a life-threatening accumulation of fluid in the lungs (pulmonary edema). Severe shor t-term exposures may result in long- lasting effects such as shortness of breath and pulmonary emphysema (larger than normal air spaces in the lungs which decrease lung efficiency). Effects of Chronic Exposure : Absorbed fluoride can cause metabolic imbalances with irregular heartbeat, central nervous system depression, seizures, and deaths. Long-term exposure may cause osteofluorosis (weakened bone structure), skin disorders, and respiratory, l iver and kidney effects. To the best of our knowledge, the chronic toxicity of this substance has not been fully investigated. SECTION 4 – First Aid Measures FIRST AID PROCEDURES SHOULD BE ESTABLISHED PRIOR TO USE. DO NOT HANDLE UNTIL ALL SAFETY PRECAUTIONS HAVE BEEN READ AND UNDERSTOOD. SEEK MEDICAL ATTENTION FOR ALL EXPOSURES. Eyes: Avoid direct contact. Wear chemical protective gloves if ne cessary. Immediately flush the contaminated eye(s) with lukewarm, gently flowing water for 15-20 minutes, while holding the eyelid(s) open. If a contac t lens is present, DO NOT delay irrigation or attempt to remove the lens. Take care not to rinse contaminated water into the unaffected eye. DO NOT use benzalkonium chloride (Zephiran®) for eye contact. If sterile 1% calcium gluconate is available, limit water flushing to 5 minutes. Then, use the 1% calcium gluconate solution to repeatedly rinse the eye(s). Immediately transport victim to an emergency care facility. Continue flushing with water, neutral saline or 1% calcium gluconate during transport, if at all possible. Skin: Avoid direct contact. Wear chemical protective clothing, if necessary. As quickly as possible, remove contaminated clothing, shoes and leather goods (e.g. watchbands, belts). Immediately flush with lukewarm, gentl y flowing water. Limit flushing with water to 5 minutes i f 0.13% benzalkonium chloride (Zephiran®) solution or 2.5% calcium gluconate gel is available. If these treatments are not available, continue flush ing until medical treatment is available. A certain quantity of either prepared so lution or the calcium gluconate gel be kept on hand at all time s. Solutions should be replaced annually if not previously used. BENZALKONIUM CHLORIDE: Begin soaking the affected area in iced 0.13% benzalkonium chloride (Zephiran®) solution. Use ice cubes, not shaved ice, to prevent frostbite. If immersion is not practical, towels should be soaked with iced 0.13% benzalkonium chlor ide (Zephiran®) solutions and used as compresses for the burned ar ea. Compresses should be changed every 2-4 minutes. Benzalkonium chloride (Zephiran®) soaks or compresses should be continued until medical attention is available. CALCIUM GLUCONATE GEL: Wearing chemical protective gloves, start ma ssaging 2.5% calcium gluconate gel into the burn site. Apply gel frequently and massage continuously until medical attention is available. Quickly tran sport victim to an emergency care fac ility. Double bag, seal, label and leave contaminated clothing, shoes and leather goods at the scene for safe disposal. Ingestion: NEVER give anything by mouth if victim is rapidly losing consci ousness, is unconscious or is c onvulsing. Have victim rinse mo uth thoroughly with water. DO NOT INDUCE VOMITING. If vomiting occurs naturally, have victim rinse mouth with water again. Quickly transport victim to an emergency care facility. Inhalation: Remove source of contamination or move victim to fresh air. If breathing is difficult, trained personnel should administer ox ygen and 2.5% calcium gluconate, preferably with a doctor's advice. DO NOT a llow victim to move about unnecessarily. Symptoms of pulmona ry edema can be delayed up to 48 hours after exposure. If breathing has stopped, tr ained personnel should begin arti ficial respiration (AR) or, if the heart has stopped, cardiopulmonary resuscitation (CPR) or automated external defibrillation (AED) immediately. Quickly transport victim to an emergency care facility. Notes to Physician: Due to delayed and persistent symptoms, observe patient closely for 48 hours. Prompt action is essential in all cases of contact and first aid procedures must be followed if any contact is su spected. Consult a doctor and/or the nearest Poison Control Centr e for ALL EXPOSURES. Some first aid procedures recommended above require adv anced first aid training. Pr otocols for undertaking advanced procedures must be developed in consultation with a doctor and routinely revi ewed. All first aid procedures should be periodically reviewe d by a doctor familiar with the material and its conditions of use in the workplace. Antidote: Always have calcium gluconate gel on hand. The use of infilitrati on therapy and intraarterial therapy for hydrofluoric acid burns resulting from concentrations greater than 20% should be made by qualifi ed medical personnel. Calcium gluconate may be administered intra venously slowly to bind to the fluoride ion. This administration needs to be monitored under the supervision of a physician. SECTION 5 – Fire Fighting Measures General Information: Hydrofluoric acid is not flammable. However, if it is involv ed in a fire, extremely corrosive and very toxic hydrogen fluorid e gas or fumes may be released into the air. Contact with metals, such as iron or steel, slowly releases extremely flammable and pote ntially explosive hydrogen gas. A large amount of heat is generated when highly concentrated hydrofluoric acid solutions are diluted with water. Closed containers may rupture violently and suddenly release large amounts of produc t when exposed to fire or excessive heat for a sufficient per iod of time. Firefighters should wear a positive pressure self-contained respirator (SCBA) and full-body encapsulating chemical protective suit. Page 50 of 84 Seastar Chemicals Inc MSDS – HYDROFLUORIC ACID Page 3 of 7 Extinguishing Media : Use extinguishing agents compatible with acid and appropri ate for fire surrounding hydrofluoric acid containers. The extinguishing medium used depends on the concentration of the acid. Water spray or fog may be used where concentrations below 60% are present. Higher concentrations may react violently with water and a dry agent, e.g. dry chemical powder is recommended. Use water spray to keep fire exposed containers cool. Auto-ignition Temperature: Not available. Flash Point: Not available. NFPA Rating: Health 4; Flammability 0; Reactivity 1. Explosion Limits: Lower: Not available. Upper: Not available. SECTION 6 – Accidental Release Measures General Information: Use proper personal protective equipment as indicated in Sect ion 8. Restrict access to area until completion of clean-up. Remove or isolate flammable and combustible materials. Ensure clean-up is conducted by trained personnel only. Spills/Leaks: Absolutely no unprotected contact with spilled material. Stop leak if without risk. Keep materials which can burn away from spilled material. Use water spray to knock down gas. Do not get water inside vessels. Dike corrosive water solutions to prevent entry i nto waterways, sewers or confined spaces. Steps to be taken in case material is released or spilled: Contain spill with absorbent material which does not react with spilled material and cautiously dilute with large excess of water. Neutralize car efully with soda ash or lime. Material will fume during neutralizat ion; approach from upwind. Provide good ventilation. Contaminated absorbent material will po se the same hazards as the spilled product. LARGE SPIL LS: Evacuate area. Contact fire and emergency services and supplier for advice. Waste disposal method: According to all applicable regulations. Avoid runoff. SECTION 7 – Handling and Storage Handling: This material is a VERY TOXIC (INHALATION and SKIN CONTACT HAZARD), CORROSIVE liquid. Never work alone with this chemical. Another person should be in view at all times and be equipped and trained to rescue. In case of leaks or spills, escape-type re spiratory protective equipment should be available in the work area. If hydrofluoric acid is released, immediately evacuate the area. Ensure that emergency eyewash and showers are in the immediate vicinity of work involving hydrofluoric acid. Prior to working with hydrofluoric acid, ensure that appropriate first aid procedures ar e established and supplies are readily acce ssible to trained personnel. Be aware of typical signs and symptoms of poisoning and first aid procedures. Any signs of illne ss should be reported immediately to supervisory personnel. S eek medical attention for all exposures even if an exposure did not seem excessive. Symptoms of a severe exposure can be delayed. Closed handling systems should be used. Avoid generating vapours or mist s. Prevent the release of vapours/mist into workplace a ir. Keep away from combustible materials. Protect from accidental contact with water. Do not use with incompatible materials. See Section 10 for more information. Keep containers tightly closed when not in use. Never return contam inated material to its original container. Never add water t o a corrosive. Always add corrosives to COLD water. When mixing with water, cautiously and slowly stir small amounts of acid into water. Assume that empty containers contain residues which are hazardous. Storage: Store in a cool, dry, well-ventilated area away from incompatib le substances. Do not store in metal or glass containers. Do n ot store in direct sunlight. Keep tightly closed. Empty container may contai n hazardous residue. Do not add any other material to the conta iner. Do not wash down the drain. Do not get in eyes, on skin, or on clothing. Wash well after use. Handle in accordance with good storage and ha ndling practices. Do not allow smoking or food consumption while handling. Store in approved containers only. Storage Code: White. SECTION 8 – Exposure Control/Personal Protection Engineering Controls : Use process enclosure, local exhaust ventilation, or ot her engineering controls to control airborne levels below recommended exposure limits. Exposure Limits: Chemical Name ACGIH NIOSH OSHA Hydrofluoric acid As F, skin: 0.5 ppm TWA; 2 ppm Ceiling As F: 3 ppm TWA (2.5 mg/m3 TWA); 6 ppm STEL (5 mg/m3 STEL); 30 ppm IDLH 3 ppm TWA Water None listed. None listed. None listed. OSHA Vacated PELs Hydrofluoric acid, as F: 3 ppm TWA Personal Protective Equipment Eyes: Wear appropriate protective eyeglasses or chemical safety goggles as described by OSHA’s eye and face protection regulations in 29 CFR 1910.133. Wear face shield. Page 51 of 84 Seastar Chemicals Inc MSDS – HYDROFLUORIC ACID Page 4 of 7 Skin: Wear appropriate protective neoprene gloves to prevent skin exposure. Wear acid-resistant jacket, trousers and boots sufficient to protect skin. Clothing: Wear appropriate protective clothing to prevent skin exposure. Respiratory Protection: Wear appropriate OSHA/MSHA approved chemical cartridge resp irator regulations found in 29CFR 1910.134. If more than TLV, do not breathe vapour. Wear self-contained breathing apparatus. Always use an NIOSH-approved respirator when necessary. Ventilation: Use only in a chemical fume hood. Adequate ventilation to maintain vapour/dust below TLV. Other Protective Equipment: Make eye bath and emergency shower available. SECTION 9 – Physical and Chemical Properties Physical State: Liquid Appearance: Clear, colourless Odour: Strong odour pH: Weak acid Vapour Pressure: Varies with concentration; 50% (w/w): 1.64 kPa (12.4 mm Hg) at 20 °C (calculated). Vapour Density: 1.86 at 25 °C (air = 1) (HF gas) Evaporation Rate: Varies with concentration Viscosity: No information available. Boiling Point: Varies with concentration; 48% (w/w): 108.7 °C (227.7 °F); 38.2% (w/w): 112.2 °C (234 °F) Freezing/Melting Point: Varies with concentration; 48% (w/w): -37 °C (-34.6 °F) Decomposition Temperature: No information available. Solubility: Soluble in water in all proportions. Soluble in ethanol; slightly soluble in diethyl ether, benzene, toluene, xylene and tetralin. Specific Gravity/Density: 50% (w/w): 1.18 at 20 °C (water = 1). Molecular Formula: HF Molecular Weight: 20.0054 SECTION 10 – Stability and Reactivity Chemical Stability: Normally stable. Conditions to Avoid: Incompatible materials, metals, high temperatures. Incompatibilities with Other Materials: Substance is incompatible with over 35 specific chem icals. Please refer to the NFPA Fire Protection Guide for specifics. Heat. Glass, concrete and other silicon-bearing materials will yield silicon tetr afluoride. Pressure build-up fr om this process has been known to blow up glass containers. Carbonates, sulphides, and cyani des will yield toxic gases such as carbon dioxide, hydrogen sulphide and hydrogen cyanide. Alkalis, some oxides, fluorine and other water- reactive materials will cause strong exothermic reactions that can be violent. Reacts with most common metals to produce hydrogen. Corrosive to many materials, including leather, rubber and many organics. Hazardous Decomposition Products: Fluoride fumes. Hazardous Polymerization : Tends to associate by means of hydrogen bonds to fo rm polymers in both liquid and gaseous states. This polymerization is not hazardous. SECTION 11 – Toxicological Information RTECS: CAS# 7732-18-5: ZC0110000. CAS# 7664-39-3: MW7875000. LD50/LC50: CAS# 7732-18-3: Oral, rat: LD50 = >90 mL/kg. CAS# 7664-39-3: Inhalation, mouse: LC50 = 342 ppm/1H. Inhalation, rat: LC50 = 1276 ppm/1H. Carcinogenicity: CAS# 7732-18-5: Not listed as a carcinogen by ACGIH, IARC, NIOSH, NTP, OSHA, or CA Prop 65. CAS# 7664-39-3: ACGIH: Not listed. California: Not listed. NIOSH: Not listed. NTP: Not listed. OSHA: Not listed. IARC: [present] (when used in drinking water) (listed as ‘FLUORIDES, INORGANIC’). Epidemiology: Standard Draize test: Eye, human – 50 mg, severe reaction. Teratogenicity: Embryo or fetus: death, Inhalation-rat TCLo = 4980 µg/m 3/4H (1-22 D preg). Reproductive: Fertility: post- and pre- implantation mortality, Inhalation-rat TCLo=470 µg/m3/4H. Mutagenicity: DNA Damage: D. Melanogaster – Inhalation 1300 ppb/6W. Sex Chromosome Loss/Non-disjunction: D. Melanogaster – Inhalation 2900 ppb. Neurotoxicity: No information available. SECTION 12 – Ecological Information Ecotoxicity: Fish (fresh water) 60 ppm lethal (time period not specified). Environmental: No information reported. Physical: No information available. Other: None. SECTION 13 – Disposal Considerations Dispose of in a manner consistent with federal, provincial/state/territorial, and local regulations. RCRA D-Maximum Concentration of Contaminants: None of the components are on this list. RCRA D Series – Chronic Toxicity Reference Levels: None of the components are on this list. RCRA F Series Wastes: None of the components are on this list. Page 52 of 84 Seastar Chemicals Inc MSDS – HYDROFLUORIC ACID Page 5 of 7 RCRA P Series Wastes: None of the components are on this list. RCRA U Series Wastes: CAS# 7664-39-3: waste number U134 (Corrosive waste, Toxic waste). RCRA Substances Banned from Land Disposal: CAS# 7664-39-3 is banned from land disposal according to RCRA. SECTION 14 – Transport Information CANADIAN TRANSPORTATION OF DANGEROUS GOODS (TDG) SHIPPING INFORMATION Shipping Name and Description: HYDROFLUORIC ACID, solution, with not more than 60 per cent hydrofluoric acid UN Number: UN1790 Class: 8, 6.1 Packing Group/Category: II Special Provisions: --- Marine Pollutant: --- Passenger Carrying Road/Railway Vehicle Index: 1 kg or L NOTE: This information incorporates the Transportation of Dangerous Goods Regulations SOR/2001-286, effective October 14, 2009. US DEPARTMENT OF TRANSPORT (DOT) HAZARDOUS MATERIALS SHIPPING INFORMATION (49 CFR) Shipping Name and Description: HYDROFLUORIC ACID, with not more than 60 percent strength Identification Number: UN1790 Hazard Class or Division: 8 Packing Group: II NOTE: This information was taken from the US Code of Federal Regulations Title 49 - Transportation and is effective July 1, 2009. IATA (1 January – 31 December 2010) Passenger and Cargo Aircraft Cargo Aircraft Only UN/ID No. Proper Shipping Name / Description Class or Div. (Sub Risk) Hazard Label(s) PG Pkg Inst Max Net Qty/Pkg Pkg Inst Max/Net Qty/Pkg S.P. See 4.4 A B C D E I J K L M 1790 Hydrofluoric acid 60% or less strength 8 (6.1) Corrosive & Toxic II 809 1 L 813 30 L NOTE: Consult IATA DG Regulations for the most recent information, abbreviations and reference marks. SECTION 15 – Regulatory Information US OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) HAZARD COMMUNICATION STANDARD (29 CFR 1910.1200) OSHA Hazard Communication Evaluation: Meets criteria for hazardous material, as defined by 29 CFR 1910.1200. US Federal TSCA: CAS# 7732-18-5 is listed on the TSCA Inventory. CAS# 7664-39-3 is listed on the TSCA Inventory. Health and Safety Reporting List: None of the components are on this list. Chemical Test Rules: None of the components are on this list. TSCA Section 12b: None of the components are on this list. TSCA Significant New Use Rule (SNUR): None of the components are on this list. CERCLA Reportable Quantities (RQ): CAS# 7664-39-3: final RQ = 100 pounds (45.4 kg). SARA Threshold Planning Quantities (TPQ): CAS# 7664-39-3: TPQ = 100 pounds. SARA Hazard Categories: CAS# 7664-39-3: Acute, chronic. SARA Section 313: This material contains Hydrofluoric acid (CAS# 7664- 39-3, 48-50%), which is subject to the reporting requirements of Section 313 of SARA Title III and 40 CFR Part 373. Clean Air Act – Hazardous Air Pollutants (HAPs): CAS# 7664-39-3 is listed as a hazardous air pollutant (HAP). Clean Air Act – Class 1 Ozone Depletors: None of the components are on this list. Clean Air Act – Class 2 Ozone Depletors: None of the components are on this list. Clean Water Act – Hazardous Substances: CAS# 7664-39-3 is listed as a Hazardous Substance under the CWA. Clean Water Act – Priority Pollutants: None of the components are on this list. Clean Water Act – Toxic Pollutants: None of the components are on this list. OSHA – Highly Hazardous: CAS #7664-39-3 is considered highly hazardous by OSHA. US State State Right to Know: Hydrofluoric acid can be found on the following state Right-to-Know lists: California, New Jersey (RTK# 3759), Florida, Pennsylvania, Minnesota, Massachusetts (10 lbs RQ). California Prop 65: No information available. California No Significant Risk Level: No information available. CANADIAN WORKPLACE HAZARDOUS MATERIALS INFORMATION SYSTEM (WHMIS) CCOHS WHMIS Classification: D1A - Poisonous and infectious material - immediate and serious effects – Very toxic D2A - Poisonous and infectious material - Other effects - Very toxic E - Corrosive material NOTE: The WHMIS Classification of D2A (chronic toxicity) for this chemical is currently under review. Page 53 of 84 Seastar Chemicals Inc MSDS - HYDROFLUORIC ACID Page 6 of 7 WHMIS Health Effects Criteria Met by this Chemical: D1A - Acute lethality - very toxic - immediate, D1B - TDG class 6.1 packing group unknown - toxic - immediate, D2A - Chronic toxicity - very toxic - other, E - Corrosive to skin, E - TDG class 8 - corrosive substance WHMIS Ingredient Disclosure List: Included for disclosure at 1% or greater. Detailed WHMIS Classification According to Criteria: Class A - Compressed Gas: Does not meet criteria. Class B - Flammable and Combustible Material: Does not meet criteria. Not combustible (does not burn). Class C - Oxidizing Material: Does not meet criteria. Class D - Poisonous and Infectious Material. Division 1 - Immediate and Serious Toxic Effects: Meets criteria for "Very toxic material". Acute Lethality: "Very toxic". LC50 (mouse): 170 ppm (4- hour exposure); cited as 342 ppm (1-hour exposure); LD50 (oral, mouse): less than 40 mg/kg (cited as less than 2 mq/kg; at 40 mg/kg all animals (numbers not reported) died within 2 hours). Transportation of Dangerous Goods (TDG): "Toxic"; class 6.1, packing group unknown. Class D - Poisonous and Infectious Material. Division 2 - Other Toxic Effects: Meets criteria for "Very toxic material". See detailed evaluation below. Chronic Health Effects: "Very toxic". Severe lung, liver and kidney damage and deaths observed in animals exposed to low concentrations (e.g. 30 ppm for 5 weeks produced complete mortality). Low concentrations cause fluorosis in humans. Carcinogenicity: Does not meet criteria. Not included in standard reference lists. Teratogenicity and Embryotoxicity: Insufficient information. There are insufficient details to evaluate the one animal study located. Reproductive Toxicity: Insufficient information. Mutagenicity: Insufficient information. The only available in vivo study is weak and inconclusive. Respiratory Tract Sensitization: Does not meet criteria. Not reported as a human respiratory sensitizer. Skin Irritation: Corrosive materials are not also classified as irritants. Eye Irritation: Corrosive materials are not also classified as irritants. Skin Sensitization: Does not meet criteria. Not reported as a skin sensitizer. Class E - Corrosive Material: Meets criteria. TDG Class 8. Corrosive to skin, carbon steel alloy 1020 and aluminum alloy 3003 at 55 °C (131 °F). No information on the corros ivity to aluminum alloy 7075-T6 was located. Class F - Dangerously Reactive Material: Does not meet criteria. Canadian DSL/NDSL: CAS# 7732-18-5 is listed on Canada’s DSL/NDSL List. CAS# 7664-39-3 is listed on Canada’s DSL/NDSL List. EUROPEAN UNION (EU) CLASSIFICATION AND LABELLING INFORMATION EU Index#: 009-003-00-1 EU Signal Word: Danger EU Classification: Acute toxicity, Oral – Category 2 Acute toxicity, Dermal – Category 1 Acute toxicity, Inhalation – Category 2 Skin corrosion – Category 1A Corrosive to metals – Category 1 EU Pictograms: GHS06 GHS05 EU Hazard Statements: H300: Fatal if swallowed. H310: Fatal in contact with skin. H330: Fatal if inhaled. H314: Causes severe skin burns and eye damage. H290: May be corrosive to metals. EU Precautionary Statements: P234: Keep only in original container. P260: Do not breathe dust/fume/gas/mist/vapours/spray. P262: Do not get in eyes, on skin, or on clothing. P264: Wash thoroughly after handling. P270: Do not eat, drink or smoke when using this product. P271: Use only outdoors or in a well-ventilated area. P280: Wear protective gloves/protective clothing/eye protection/face protection. P284: Wear respiratory protection. P301+P310: IF SWALLOWED: Immediately call a POISON CENTER or doctor/physician. P301+P330+P331: IF SWALLOWED: Rinse mouth. Do NOT induce vomiting. P302+P350: IF ON SKIN: Gently wash with plenty of soap and water. P303+P361+P353: IF ON SKIN (or hair): Remove/Take off immediately all contaminated clothing. Rinse skin with water/shower. P304+P340: IF INHALED: Remove victim to fresh air and keep at rest in a position comfortable for breathing. P305+P351+P338: IF IN EYES: Rinse cautiously with water for several minutes. Remove contact lenses, if present and easy to do. Continue rinsing. P310: Immediately call a POISON CENTER or doctor/physician. P320: Specific treatment is urgent (see Section 4 for first aid instructions in case of skin exposure). P321: Specific treatment (see P310). P330: Rinse mouth. P361: Remove/Take off immediately all contaminated clothing. P363: Wash contaminated clothing before reuse. P390: Absorb spillage to prevent material damage. P403+P233: Store in a well-ventilated place. Keep container tightly closed. P405: Store locked up. P406: Store in corrosion resistant container with a resistant inner liner. P501: Dispose of contents/container according to federal, regional and local government requirements. Exposure Limits: (listed under FLUORIDES, as F) OES-United Kingdom: TWA 2.5 mg/m3, STEL 3 ppm (2.5 mg/m3). Page 54 of 84 Seastar Chemicals Inc MSDS - HYDROFLUORIC ACID Page 7 of 7 SECTION 16 – Other Information The statements contained herein are offered for informational purposes only and are based upon tech nical data. Seastar Chemicals Inc believes them to be accura te but does not purport to be all-inclusiv e. The above-stated product is intended for use only by persons having the necessary technical skill s and facilities for handling the product at their discretion and risk. Since conditions and m anner of use are outside our control, we (S eastar Chemicals Inc) make no warranty of merchantability or any such warranty, express or implied with re spect to information and we a ssume no liability resulting from the above product or its use. Users s hould make their own investigations to determine suitability of information and product for their particular purposes. Page 55 of 84 STATE OF WISCONSIN VILLAGE OF GERMANTOWN WASHINGTON COUNTY RESOLUTION NO. _____-2026 A RESOLUTION TERMINATING THE USE OF ADDITIVE FLUORIDE IN THE GERMANTOWN PUBLIC WATER SYSTEM WHEREAS, the Village Board acted in 1975 to start adding fluoride to the Village’s public water system; and WHEREAS, the Wisconsin Public Service Commission is directed under Wis. Stat. § 196.03(3)(a) to include the cost of fluoridation in the determination of water rates; and WHEREAS, the Wisconsin Department of Natural Resources imposes certain requirements on utilities with fluoridated water; and WHEREAS, the Village Board, acting as the Committee of the Whole during budget preparations, directed staff to remove the cost of the fluoridation program from the budget; and WHEREAS, the Village Board needs to formally act to reverse prior Board action and to have appropriate records for regulatory bodies on the issue of fluoridation; and WHEREAS, the Village Board desires to stop the Village’s additive fluoridation program; NOW, THEREFORE, BE IT RESOLVED, by the Village Board of the Village of Germantown, Wisconsin, that the Village’s water utility shall stop adding fluoride to the public water system on January 1, 2027, or upon the exhaustion of the Village’s current supply of fluoridation materials, whichever is sooner. Adopted: ____________________ Vote: Ayes: Nays: Absent: ____________________________________ Robert A. Soderberg, Village President ATTEST: ____________________________________ Donna Ott, Village Clerk Page 56 of 84 BUSINESS OF THE PUBLIC WORKS & HIGHWAYS COMMITTEE MEETING DATE: November 4, 2026 PLACEMENT: Action Item ITEM TITLE: Award of Contract to Zenith Tech, Inc. in the amount of $95,600.00 and to include a 10% contingency of $9,560.00 for a total amount of $105,160.00 for the Maple Road Bridge Repair. (ACTION) SUBMITTED BY: Timothy Zimmerman, Public Works Director SUMMARY EXPLANATION: The 2026 Road Program includes money for the repair of the Maple Road Bridge over the Goldendale Creek. The PWHC approved Option “A” repair at the May 2026 PWHC meeting which includes the following: Repair the Deficient West Outer Channel Beam with Concrete Surface Repairs, Galvanic Anodes and Fiber Wrap. Estimated cost range includes Embedded Galvanic Anodes, Concrete Surface Repair, and Fiber Wrap Reinforcing Non-Structural, some minor traffic control, and the cost of Mobilization. In addition, the cost of surface repairs to the other channels is included in the estimate. On behalf of the Village, MSA Professional Services bid this project, and the bid results are as follows: Zenith Tech, Inc. $95,600.00 Engineers estimate $65,000-$85,000 ATTACHMENT: 1. 7 - Maple Road Bridge Repair - Staff Memo - cover 2. 01 Owner Recommendation of Award Ltr 10.22.2026 STAFF RECOMMENDATION: Staff requests the PWHC recommend to the Village Board approval of a contract with Zenith Tech, Inc. for the Maple Road Bridge repair in the amount of $95,600.00 and allow a 10% contingency of $9,560.00 for the total amount of $105,160.00. Funded in 40-5561000-594300 Bridges in the amount of $275,000.00. ACTION BY COMMITTEE: Page 57 of 84 BUSINESS OF THE PUBLIC WORKS & HIGHWAYS COMMITTEE GERMANTOWN, WI MEETING DATE: May 13, 2026 AGENDA ITEM: New Business ITEM TITLE: Maple Road Bridge Repair over Goldendale Creek SUBMITTED BY: Kevin Driscoll – Village Engineer SUMMARY EXPLANATION: An inspection was completed by Washington County and Village staff was notified of the necessary repair work. This work was budget ed and approved, and a consultant delivered a conceptual design report. See attached. Staff anticipates bidding out to repair work once a design approach is selected. The steel beam and concrete surface repair alternatives were evaluated in th e study. Both are feasible options for addressing the deficient western, exterior channel beam. Replacement with a new precast concrete channel beam is not a feasible repair option because of the post-tensioned tie rods connecting the channel beams. Supplementing the precast concrete channel beam with a new steel beam addresses the deficient strength of the structure, but would also require traffic control (option B). The concrete surface repair and fiber wrap system offers the improved strength with less traffic control required during construction (option A). The Village may select a preferred option based on budget, desired durability, and long-term maintenance considerations. Alternative A: Estimated Cost amount $65,000 - $80,000 Repair the Deficient West Outer Channel Beam with Concrete Surface Repairs, Galvanic Anodes and Fiber Wrap . Estimated cost range includes Embedded Galvanic Anodes, Concrete Surface Repair, and Fiber Wrap Reinforcing Non-Structural, some minor traffic control, and the cost of Mobilization. In addition, the cost of surface repairs to the other channels is included in the estimate. Construction Engineering & Contingency is not included in these costs. Alternative B: Estimated Cost amount $85,000 - $120,000 Partial Replacement of the West Outer Channel Beam Exterior Web (Outer Leg) with a Steel Beam Estimated cost range includes jacking existing channel beam, sawcutting, removal of the deficient exterior web (outer leg) of the western channel beam, placing a new steel beam, traffic control, and the cost of Mobilization. In addition, the cost of surface repairs to the other channels is included in the estimate. Construction Engineering & Contingency is not included in these costs. ATTACHMENT: ORDINANCE RESOLUTION OTHER __X___ Exhibit A – Budget, Exhibit B - Study RECOMMENDATION: Staff requests the Public Works and Highways Committee direct staff to pursue an alternate for plan development by MSA, an proceed with repair process, and look to Page 58 of 84 program for future bridge replacement of Structure V-66-041. COMMITTEE ACTION: A motion to support authorize staff and a vote “Aye” is in the affirmative to support the contract Page 59 of 84 G:\00\00223\00223006\Spec\00 Construction Contracts\00223006 NOA, NTP Ltrs.docx 1230 South Blvd. Baraboo, WI 53913 P: (608) 356-2771 TF: (800) 362-4505 F: (608) 807-5148 www.msa-ps.com October 22, 2026 Bob Soderberg, Village President Village of Germantown N112 W17001 Mequon Road Germantown, WI 53022 Re: Maple Road Over Goldendale Creek Bridge Repair Village of Germantown Dear Mr. Soderberg: Upon review of the bidreceived on October 22, 2026 for the above-referenced project, it was found that it was submitted by a qualified contractor. It is our recommendation that the responsive bidder listed below be accepted and award made at your next meeting. Zenith Tech, Inc. N6w23673 Bluemound Road Waukesha, WI 53188 Bid Amount $95,600.00 Please execute the enclosed Notice of Award for the contract . Once the form is signed, please email a copy backto dspindler@msa-ps.com. After receiving the executed copy, we will forward one copy of the Notice of Award and the remaining contract package to the Contractor. Sincerely, MSA Professional Services, Inc. Julia Zehner, PE Project Manager Engineering dds Enc. Page 60 of 84 00 51 00 Notice of Award EJCDC® C-510, Notice of Award. Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. G:\00\00223\00223006\Spec\00 Construction Contracts\00223006 NOA, NTP, Bonds.docx NOTICE OF AWARD Date of Issuance: Owner: Village of Germantown Owner's Contract No.: Engineer: MSA Professional Services, Inc Engineer's Project No.:00223006 Contract: Village of Germantown - Maple Road Over Goldendale Creek Bridge Repair Bidder: Zenith Tech, Inc. Bidder's Address: N6w23673 Bluemound Road, Waukesha, WI 53188 You are notified that your Bid dated October 22, 2026, for the above Contract, and that you are the Successful Bidder and are awarded a Contract for Maple Road Over Goldendale Creek Bridge Repair. Base Bid The Contract Price of your Contract is Ninety-five thousand six-hundred Dollars and 00/100 Cents ($95,600.00). Contract Price is subject to adjustment based on the provisions of the Contract, including but not limited to those governing changes, Unit Price Work, and Work performed on a cost-plus-fee basis, as applicable. [1] unexecuted counterparts of the Agreement accompany this Notice of Award, and one copy of the Contract Documents accompanies this Notice of Award, or has been transmitted or made available to Bidder electronically. ☑ Drawings will be delivered separately from the other Contract Documents. You must comply with the following conditions precedent within 15 days of the date of receipt of this Notice of Award: 1. Deliver to Owner [1] counterparts of the Agreement, signed by Bidder (as Contractor). 2. Deliver with the signed Agreement(s) the Contract security (such as required performance and payment bonds) and insurance documentation, as specified in the Instructions to Bidders and in the General Conditions, Articles 2 and 6. 3. Other conditions precedent (if any): N/A Failure to comply with these conditions within the time specified will entitle Owner to consider you in default, annul this Notice of Award, and declare your Bid security forfeited. Within 10 days after you comply with the above conditions, Owner will return to you one fully signed counterpart of the Agreement, together with any additional copies of the Contract Documents as indicated in Paragraph 2.02 of the General Conditions. Owner: Village of Germantown __________________________________________________ __ By (signature): ________________________________________________________ Name (printed):Bob Soderberg Title: Village President Copy to Engineer Page 61 of 84 Village of Germantown - Maple Road Over Goldendale Creek Bridge Repair (#10321078) Owner: Germantown, Village of Solicitor: MSA Professional Services - Baraboo 10/22/2026 10:00 AM CDT Item No.Item Description UofM QuantityUnit Price Extension General 203.0335Debris Containment Over Waterway V-66-41EACH 1 $700.00 $700.00 509.0150Concrete Surface Repair SF 32 $530.00$16,960.00 619.1000Mobilization EACH 1 $54,600.00$54,600.00 643.5000Traffic Control EACH 1 $1,500.00 $1,500.00 SPV.0165Fiber Wrap Reinforcing Non-Structural SF 52 $420.00$21,840.00 Base Bid Total: $95,600.00 Zenith Tech, INC. Page 62 of 84 Page 63 of 84 Page 64 of 84 Page 65 of 84 Page 66 of 84 Page 67 of 84 Page 68 of 84 Page 69 of 84 Page 70 of 84 Page 71 of 84 Page 72 of 84 Page 73 of 84 BUSINESS OF THE PUBLIC WORKS & HIGHWAYS COMMITTEE MEETING DATE: November 4, 2026 PLACEMENT: Action Item ITEM TITLE: Award of Contract to Southern Wisconsin Appraisals for Appraisal Services for WisDot Project 2300-05-21 in the amount of $107,850.00. (ACTION) SUBMITTED BY: Timothy Zimmerman, Public Works Director SUMMARY EXPLANATION: WisDOT Project ID 2300-05-21 is a connecting highway project between IH-41 E Ramps and S STH 145. This project will address deteriorating pavement and decreased ride quality on STH 167. Along with addressing existing pavement conditions, the project will replace the out-of-date signals at six intersections, replace curb ramps to current standards throughout the corridor, add sidewalk at key locations to connect existing, replace an at-grade railroad crossing surface, and perform maintenance at existing cross culverts and ditches. The Village is responsible for the real estate acquisition and coordination on the parcels impacted by the improvements outside of the right-of-way. Staff received three qualified proposals for this project. They are as follows: Southern Wisconsin Appraisals (SWA) Traditional $107,850.00 Jewell Associates Engineers Hybrid $64,000 Base + $2,000 ea. If converted to appraisal $118,000.00 Terra Venture Advisors, LLC Hybrid $105,850 Incl.12 Appraisals Additional appraisals at $2,500.00. ATTACHMENT: 1. VGT RFP Summary and Description for STH 167 STAFF RECOMMENDATION: Staff requests the PWHC recommend to the Village Board approval of a Professional Services Agreement with Southern Wisconsin Appraisals (SWA) because its fixed-cost proposal avoids the Sales Study/Nominal Acquisition process and related risk of additional appraisal costs. The Village has successfully worked with SWA on previous land acquisitions, and WisDOT supports the proposal and associated costs. Page 74 of 84 Reimbursement procedures by WisDOT are included in the project scope. Money is budgeted in 40561000-593800 HWY 167 Improvements. ACTION BY COMMITTEE: Page 75 of 84 Village of Germantown Project #2703 STH 167 (Mequon Road) WisDOT Project ID 2300-05-21 is a connecting highway project between IH-41 E Ramps and S STH 145. This project will address deteriorating pavement and decreased ride quality on STH 167. Along with addressing existing pavement conditions, the project will replace the out-of-date signals at six intersections, replaced curb ramps to current standards throughout the corridor, add sidewalk at key locations to connect existing, replaced an at-grade railroad crossing surface, and perform maintenance at existing cross culverts and ditches. The Village is responsible for the real estate acquisition and coordination on the parcels impacted by the improvements outside of the right-of-way. Following the WisDOT land acquisition process, the Village sent out RFP’s (request for proposals) to the state approved list of appraisers and consultants. We received seven proposals, three of which met the criteria for the project scope: • Southern Wisconsin Appraisals (SWA) • Jewell Associates Engineers, Inc. • TerraVenture Advisors LLC The selected consultant is anticipated to be approved by Village Board on November 16, 2026. A WisDOT kickoff meeting is scheduled for November 18, 2026, at 10:00am. Other project target dates include: • WisDOT PS&E – 5/1/2028 (Advanced) or 5/1/2029 (Programmed) • WisDOT Let – 9/11/2028 (Advanced) or 9/11/2029 (Programmed) Below is a summary of the three proposals including cost estimates and schedules: Page 76 of 84 Southern Wisconsin Appraisals (SWA) Cost Estimate: Schedule and Summary of Services: SWA anticipates that acquisitions will be completed by May 1, 2028. This timeline may be negotiable and may also change based on the addition of properties to the project or changes in project design or other considerations. Upon completion of acquisition services, we shall provide the Village of Germantown copies of documents per parcel, as appropriate, and project reports including: Negotiation Diary, Copies of all recorded conveyances, Copies of all recorded Partial Release of Mortgage or waiver (if applicable), Statement to Construction Engineer, Payment Request and Copies of Payment(s), Administrative Revision (if applicable), Closing Statement (if applicable), Disposition of RE tax - pro-rated (if applicable), Introduction Letter & Correspondence (most recent on top), Approved Offering Price Report, Appraisal Report, and LPA Certification of Right-of-Way. These documents will be provided electronically, or hard copies may be provided upon request. Additionally, our services include fees for project management services and for recording forty-one (41) documents at the register of deeds. Our scope of work also includes the preparation of the Certification of LPA Right of Way Acquisition Form, required for WisDOT right of way clearance, and the Statement of Expenditures form, required for applicable WisDOT real estate reimbursement. Our fees include attending meetings for the purpose of discussing and reviewing the services to be provided, the project start-up meeting, and a visit to the project site. Based on the information that twenty-nine (29) parcels are expected to be appraised and acquired, the total cost for the services required to complete this project is $107,850. Should the number of parcels on the final plat be more or less than twenty-nine (29), our scope of work will be adjusted accordingly. Page 77 of 84 Jewell Associates Engineers, Inc. Cost Estimate: Page 78 of 84 Schedule and Summary of Services: Based on our review of the preliminary plat, the project consists primarily of temporary limited easement acquisitions (TLE) with several fee acquisitions affecting commercial parcels. We believe the project is well-suited for a proactive acquisition approach that emphasizes early coordination and nominal settlements while providing the tools necessary to successfully address more complex acquisitions if they arise. Page 79 of 84 TerraVenture Advisors LLC Cost Estimate: Page 80 of 84 Schedule and Summary of Services: TerraVenture Advisors (TVA) proposes completing the following scope of services for acquiring the real estate interests needed for this project: • Project Management • Sales Study/Appraisals • Acquisition Services • Encroachments (if necessary) • Relocation Services The parcels for the project are considered Nominal acquisitions, which means they are considered less than $25,000. This indicates that a Sales Study is sufficient to determine just compensation offers for the project parcels. The cost for TVA to complete the Sales Study is included in our proposal’s cost. We are including up to 12 appraisals to be completed for this project. Any additional parcels that would need to be appraised, whether requested by a property owner or deemed necessary by the agency, can also be completed as shortform appraisal by TVA. If needed, appraisal costs associated with obtaining estimates from contractors for improvements (ex: landscaping) will be either billed to the municipality directly or reimbursed to TVA at actual cost. The costs are based Page 81 of 84 on an actual cost-plus fixed fee, not to exceed basis. Expenses associated with contractor estimates (landscaping, etc.) that may be needed for completing appraisals, if necessary; and fees charged by banks for partial release of mortgages, if necessary, are all variable costs and not included in the costs outlined above. These expenses will be billed to the municipality based on actual costs. All other costs such as postage, mileage and recording fees are included in the totals on the cost form. Engineering/DPW Recommendation: We recommend Southern Wisconsin Appraisals (SWA) because its fixed-cost proposal avoids the Sales Study/Nominal Acquisition process and related risk of additional appraisal costs. The Village has successfully worked with SWA on previous land acquisitions, and WisDOT supports the proposal and associated costs. Reimbursement procedures by WisDOT are included in the project scope. Page 82 of 84 Directors Report – October 2026 Engineering Kyle Samann – Village Engineer – started 10/26 Road program including 2026 Roads along with seal coating program Esquire Estates - Surface Complete Division Rd. - Binder course complete Mequon to Hawthorn, path surfaced and restored, storm sewer on-going as is bridge scour work Heritage Hills - Complete Western Ave. - Complete 2026 Seal Coat program is complete Pleasant View culvert replacement, ARIP road project Lovers Lane South to Freistadt. (Award of Contract) Mid November Closure gas relocation Maple Rd. Bridge repair over Willow Creek. Repair of deteriorated west beam addresses remaining lifespan of the structure. Winter Closure CTH Q & STH 175 Intersection Signal Replacements. Awarded to LaLonde Pioneer Rd – Public Information meeting held 10/27 Town of Jackson Fiber install on going by AT&T Meadow Creek xing, Lone Oaks Highways, Parks, Buildings, and Grounds and Shop Crack sealing on going Currently down two operator due to resignation of Parks Crew Leader and recent resignation of a highway operator Plow Truck set up underway for winter operation transition Page 83 of 84 Water Utility Commercial Meter replacements Residential meter replacements On going hydrant repair throughout the Village Fill pipe leak at Tower 2 repaired back on line Well 7 liner – Postponed Valve exercising Wastewater Utility System Jetting and CCTV area 3 Yard Waste - Stopped taking buckthorn as of 8/16 Performing sanitary adjustments 2026 road program Revised SSSA administrative review letter received 10/1 Collection System Facilities Plan – Submitted to DNR in review Main St. and Old Farm Facilities Plan – Submitted to DNR approval of the CSFP plans are currently at 75% and Village and consultant met to review Page 84 of 84

Source: Village of Germantown website. First collected Nov 4, 2026.