Common Council Agenda Packet - 7:30 PM
City of Oconomowoc · Waukesha County · meeting of Nov 3, 2026 · Agenda packets
Open the original document More from City of Oconomowoc
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
City of Oconomowoc
Common Council
Tuesday, November 03, 2026 - 7:30 PM
City Hall - Council Chambers
174 E. Wisconsin Ave. Oconomowoc, WI 53066
Notice: If a person with a disability requires that the meeting be accessible or that materials at the
meeting be in an accessible format, call the City Clerk’s office at least 48 hours in advance to request
adequate accommodations. Tel: (262) 569-2186
1. Call to order and confirmation of appropriate meeting notification
2. Pledge of Allegiance
3. Roll Call
4. Public Hearing
a. Public Hearing - 2027 Proposed City Budget
The purpose is to hear public comment on the Proposed 2027 City of Oconomowoc Budget
5. Approval of Meeting Minutes
a. Minutes of October 20, 2026
6. Comments/Suggestions from Citizens
7. Consent Agenda (Items listed under the Consent Agenda are considered in one motion - a
Council member may request to remove an item):
a. Easements in Olde Highlander
b. Resolution 26-R3240 Approving City Elevator and Electric Upgrades
c. Resolution 26-R3416 Awarding Cooney Substation Electrical Panel Replacement
d. Resolution 26-R3419 for Disallowance of Claim - Meckl
e. Licenses
1. License Approval
8. New Business
a. Consider/act on the Adoption of the City of Oconomowoc 2027 Annual Budget
b. Consider/act on Setting the 2026 Property Tax Levy for the 2027 City of Oconomowoc
Budget
c. Consider/act on Resolution 26-R3413 Approving the 2027 Wastewater Treatment Rate
Adjustment
1
d. Consider/act on Adoption of the 2027 Utility Budgets (Wastewater, Water, Electric)
9. Mayoral Appointment to Council Committee
a. Mayoral Appointment to Fill Community Development Authority Vacancy
10. Staff Reports
11. Reports and Comments from the Aldermen
12. Reports and Comments from the Mayor
13. Adjourn
2
2026 2027 Percent
Budget Budget Change
218,050$ 228,050$
12,000 12,000
3,153,893 3,210,759
1,460,200 1,482,700
294,500 287,500
773,595 775,843
3,950 3,950
772,285 816,889
Total Revenues Excluding Property Taxes 6,688,473 6,817,691 1.9%
12,496,181 13,011,059 4.1%
1,806,000 1,877,795
600,000 673,500
TOTAL REVENUES, OTHER FINANCING SOURCES & FUND BALANCE APPLIED 21,590,654$ 22,380,045$ 3.7%
EXPENDITURES, OTHER FINANCING USES & FIRE RESERVES:
2,141,095$
2,002,919$
10,124,919 11,468,459
3,357,979 3,449,901
139,905 127,406
1,414,967 1,507,826
2,483,698 2,551,766
560,094 598,269
20,222,658 21,706,545 7.3%
885,850 673,500
482,146 -
TOTAL EXPENDITURES, OTHER FINANCING USES & FIRE RESERVES 21,590,654$ 22,380,045$ 3.7%
The 2027 proposed budgets for all funds combined:
2026 Budget
2027 Budget
General Fund $14,071,942 $21,706,545 $22,380,045 $13,398,442 $12,496,181 $13,011,059
Fire & Ambulance Reserve Fund 1,292,617 5,000 150,000 1,147,617
Garbage & Refuse Special Revenue Fund 525,244 1,363,225 1,476,513 411,956
Woodcreek Stormwater Fund 123,108 8,451 8,599 122,960
River Watershed Fund 191,903 432,754 432,754 191,903
Transportation Facilities Impact Fee Fund (833,974) 159,000 30,000 (704,974)
Law Enforcement Facilities Impact Fee Fund 460,819 157,000 314,100 303,719
Park & Recreation Facilities Impact Fee Fund 2,735,988 710,000 515,000 2,930,988
Police Equipment Donations Fund 8,116 - 400 7,716
K9 Fund 9,288 500 9,514 274
Community Development Authority Fund 49,664 100 10,000 39,764
Tourism Fund 615,579 567,100 736,344 446,334
Debt Service Fund 337,412 4,974,564 4,974,564 337,412 2,306,231 2,634,181
T.I.D. #8 Capital Projects Fund (1,644) - 150 (1,794)
T.I.D. #4 Capital Projects Fund 803,957 5,000 808,957 -
T.I.D. #5 Capital Projects Fund (294,697) 857,386 42,013 520,676
T.I.D. #6 Capital Projects Fund (69,430) 509,735 1,202,763 (762,459)
T.I.D. #7 Capital Projects Fund 7,404,330 1,659,903 6,757,451 2,306,782
Capital Improvements Fund 6,345,575 3,517,286 5,983,799 3,879,062 2,100,000 2,314,905
Wastewater Utility 90,332,135 9,196,717 6,686,196 92,842,656
Water Utility 52,124,394 7,696,329 5,635,374 54,185,349
Electric Utility 64,818,600 32,222,929 29,375,958 67,665,571
Technology Internal Service Fund 1,008,257 1,054,350 1,154,282 908,325
Risk Management Internal Service Fund 256,418 798,286 798,286 256,418
Fleet Maintenance Internal Service Fund 274,798 893,576 893,576 274,798
TOTAL ALL FUNDS $242,590,400 $88,495,736 $90,376,638 $240,709,496 $16,902,412 $17,960,145
PERCENT CHANGE -0.8% 6.3%
2026 2027 $ Change % Change
Estimated Equalized Value Property Tax Rate $4.11 $4.05 -$0.06 -1.6%
Estimated Assessed Value Property Tax Rate $4.16 $4.16 $0.00 0.0%
The City's outstanding debt at December 31, 2026 is projected to be:
General Obligation Notes & Bonds $41,185,000
Unsecured Debt -
Mortgage Revenue Bonds -
Utility Revenue Bonds -
TOTAL DEBT $41,185,000
Total Expenditures
Other Financing Uses
Fire Reserves
SUMMARY BY FUND
If a person with a disability requires the meeting be accessible or materials at the meeting be in an accessible format call the Clerk's office at 262-569-2186 at least 48
hours prior to the meeting to request adequate accommodations. Interested persons may attend the hearing in person or submit their opinions to the City Clerk in writing
prior to the hearing. Gina Kozlik, City Clerk
Fund Balance
January 1
Total
Revenues
Total
Expend
Fund Balance
December 31
Property Tax Contribution
Public Charges for Services
Interfund Charges for Services
Miscellaneous Revenues
Conservation & Development
General Property Taxes
Other Financing Sources
Fund Balance Applied
General City Government
Public Safety
Public Works
Health & Human Services
Library
Parks and Recreation
Taxes (other than property taxes)
Special Assessments
Intergovernmental Revenues
Licenses and Permits
Fines, Forfeits and Penalties
RESIDENTS & TAXPAYERS please take notice the City of Oconomowoc Common Council has scheduled a Public Hearing on the proposed 2027 budget to be held in
Council Chambers, 2nd floor of City Hall, 174 E Wisconsin Ave, Oconomowoc WI at 7:30pm on November 3, 2026.
CITY OF OCONOMOWOC PROPOSED BUDGET SUMMARY
GENERAL FUND SUMMARY BY CATEGORY
The 2026 adopted & 2027 proposed General Fund budgets are as follows:
REVENUES, OTHER FINANCING SOURCES & FUND BALANCE APPLIED:
3
1
Common Council - October 20, 2026
City of Oconomowoc
Common Council Meeting Minutes
October 20, 2026 - 7:30 PM
Aldermen Present: Jennifer Aultman Kloth, Kevin Ellis, Karen Spiegelberg, Charles Schellpeper, Lou Kowieski, Erik
Jungwirth, Zachary Frankowski
Also Present: Matt Rosek, Stan Riffle, Mark Frye, Gina Kozlik, Eric Boettcher, Robert Duffy, Jason Gallo, Jason
Herzog, Kevin Kaari, James Pfister, Tim Reel, Steve Hatton, Ivan Lam
Mayor Rosek called the Common Council Meeting to order at 7:30 PM and appropriate meeting notice was
confirmed.
Pledge of Allegiance
Roll Call
Public Hearing
a. Public Hearing - Reddelien Road Vacation
The Common Council introduced a Resolution at its September 1, 2026 meeting in which it considered
the discontinuance of part of Reddelien Road, within the Weston Acres Subdivision, consisting of 78,584
SF (1.80 acres) and set October 20, 2026 for a public hearing. The purpose of the hearing is to hear
public comment on the proposed partial vacation of Reddelien Road as described and shown on the
attached map. The roadway vacation is being requested as the road will be reconstructed to the west, at
which time the existing road will be removed and developed into single-family lots. The Council may, but
is not required to, consider and act on the resolution at the October 20, 2026 Common Council meeting.
The Public Hearing opened at 7:30 PM. City Planner Jason Gallo introduced the item on for public
hearing. He explained this is the last step in the process to discontinue this portion of public right-of-way.
There were no public speakers. The Public Hearing closed at 7:33 PM.
b. Public Hearing - Make It Happy Cafe Rezoning
The purpose is to hear public comment rezone 196 SF of land (.0045 acres) with dimensions of 8.5’ x 23’
located directly north of 162 E. Wisconsin Avenue. The area is zoned IP – Institutional / Public District
and the request is to rezone it to MC – Mixed-Use Commercial. The area to be rezoned is owned by the
City of Oconomowoc and is an unused area of the municipal parking lot. This area is tentatively being
sold to the owners of 162 E. Wisconsin Avenue who intend to combine the 196 SF with their existing
parcel to allow for a future building addition for Make It Happy Cafe.
The Public Hearing opened at 7:33 PM. Gallo gave an overview PowerPoint presentation and showed
the area involved with details. There was no one present to speak. The Public Hearing closed at 7:34
PM.
c. Public Hearing - Journey21 PD Amendment
The purpose is to hear public comment to amend the Planned Development Ordinance for the project
known as Journey21 (PD-321) to change the layout from what was previously approved on the 12.05
acre area for both the enrichment center and the future residential area. The parcels are located at 1669
& 1671 Old Schoolhouse Road, identified as tax keys #OCOC 0616.999.038 (enrichment center) and
OCOC 0616.999.039 (future residential area). The request is to enlarge the enrichment center with the
construction of a learning center (28,000 SF); increase the lodge from 16 apartment units to 60 units; and
decrease the number of cottages from 12 to 11. The proposed number of residential units would
increase from 28 units to 71 units. The applicant is also requesting to be allowed to increase the building
4
2
Common Council - October 20, 2026
height for the lodge apartments from 35’ to 45’ and allow a reduction in parking from the 94 required stalls
to 83 proposed stalls.
The Public Hearing opened at 7:34 PM. Gallo gave an overview PowerPoint presentation of the changes
requested to the General Development Plan with the Planned Development asking for flexibility in
building height and parking stall reduction with providing enhanced walkability and connectivity benefits to
the City. Gallo noted a right-of-way permit could be approved by city staff since for the sidewalk rather
than come back. He also reviewed the three added exceptions required to be met. There were no public
comments. The Public Hearing closed at 7:44 PM.
Approval of Meeting Minutes
a. Minutes of October 6, 2026
Motion to approve the Council minutes of October 6, 2026 made by Kowieski and seconded by
Spiegelberg. Motion carried 7-0-0.
Comments/Suggestions from Citizens
Mike Beatty, 1048 Saratoga Ct, spoke in support of the Flock camera system and the Police Department.
Consent Agenda (Items listed under the Consent Agenda are considered in one motion - a Council
member may request to remove an item):
Motion to approve the Consent Agenda made by Frankowski and seconded by Ellis. Motion
carried 7-0-0.
a. Treasurer's Report
1. Treasurer's Report and Financials - September 2026
b. Electric Utility Easement Agreement Between the City of Oconomowoc and Thomas R Monis
and Barbara J Monis LLV0542044
c. Electric Utility Easement Agreement Between City of Oconomowoc and Ellen A Glynn
LLV0542045
d. Final Plat for Weston Acres Phase I, to create 25 single-family lots & 6 duplex lots, located
along Reddelien Rd, between Marks Rd & Weston Ridge Rd.
e. Certified Survey Map for Village Square Holdings to divide one 27.29 acre lot into four lots
located at the SE corner of Valley Road & Pabst Farms Circle
Committee Reports
a. Finance - Aultman Kloth, Chr; Schellpeper, Secy; Frankowski
1. Consider/act on Resolution 26-R3415 Approving Budget Amendments for 3rd
Quarter Grants and Donations Received (7/1/26 - 9/30/26)
This item moved forward with unanimous recommendation from Committee. There was discussion
and support for the Police Department e-bike purchase. It was confirmed that the police bikes are
exempt for their specific purpose of safety on trails.
Motion to adopt Resolution 26-R3415 approving Budget Amendments for 3rd Quarter Grants and
Donations received (7/1/26 - 9/30/26) made by Aultman Kloth and seconded by Kowieski.
Motion carried 7-0-0.
5
3
Common Council - October 20, 2026
Plan Commission
a. Consider/act on Resolution 26-R3411 Vacating a Portion of Reddelien Road within Weston
Acres Subdivision
City Planner Gallo gave details on this item at the Public Hearing.
Motion to adopt Resolution 26-R3411 Vacating a Portion of Reddelien Rd within Weston Acres
Subdivision made by Ellis. Motion carried 7-0-0.
b. Consider/act on Resolution 26-R3414 Approving the Sale of Public Property to Make It Happy
Café 66, LLC to be attached to 162 E. Wisconsin Avenue
City Planner Gallo gave details on this item at the Public Hearing.
Motion to adopt Resolution 26-R3414 approving the Sale of Public Property to Make It Happy Cafe
66, LLC made by Ellis and seconded by Aultman Kloth. Motion carried 7-0-0.
c. Consider/act on the Certified Survey Map for Make It Happy Cafe 66, LLC to combine 196 SF
of land to the existing parcel located at 162 E. Wisconsin Avenue
City Planner Gallo gave details on this item at the Public Hearing.
Motion to approve the CSM for Make It Happy Cafe 66, LLC to combine 196 SF of land to the
existing parcel located at 162 E. Wisconsin Ave made by Ellis and seconded by Jungwirth.
Motion carried 7-0-0.
d. Consider/act on Ordinance 26-O1139 to rezone 196 SF from Institutional/Public to Mixed-Use
Commercial for Make It Happy Café 66, LLC at 162 E. Wisconsin Ave - 1st Reading
City Planner Gallo gave details on this item at the Public Hearing.
Motion to adopt the ordinance and waive the second reading made by Aultman Kloth and
seconded by Ellis. Motion carried 7-0-0.
e. Consider/act on Ordinance 26-O1137 to amend the Planned Development Overlay District
PD-3-21 for Journey21, located at 1669 & 1671 Old Schoolhouse Road - 1st Reading
City Planner Gallo gave details on this item at the Public Hearing. There was discussion and some
concern about the change in density, the height, and questions about control the overlay allows. There
was consensus supporting this as the right project to allow for changes. Administrator Frye provided that
there was an increase in RECs with the extension of sewer, allowing for increased capacity. The Mayor
explained the additional three bullets that were added securing details about construction start, delays
and use changes. Judy Taylor, President and CEO of Journey 21 was in attendance and explained their
fundraising campaign and timing and how additional units help the financial model and affordability. The
addition of the sidewalk connectivity was discussed with access to the trail and the YMCA.
Motion to adopt the ordinance and waive the second reading Waive 2nd reading and two requested
additions row and pd exemption changes made by Ellis and seconded by Spiegelberg.
Motion carried 7-0-0.
Mayoral Appointments with Council Confirmation
a. Mayoral Appointment with Council Confirmation
Michael Weix appeared and answered questions from Council on his background and the position. The
alderman discussed the number of hours that will be put in from this voluntary position especially with
search for a new Police Chief.
Motion to confirm the Mayor's appointment as presented michael Weix made by Aultman Kloth and
seconded by Frankowski. Motion carried 6-0-1. Abstained: Spiegelberg.
Staff Reports
Clerk Kozlik gave an update regarding the December Special Election for County Executive and the District 1
Aldermanic seat with the closure of the nomination filing period that day. She announced there would not be a
November Primary and Ken Kreiser will be advancing unopposed for the Aldermanic District 1 vacant seat.
6
4
Common Council - October 20, 2026
Reports and Comments from the Aldermen
Kowieski read his letter of appreciation to Brian Borkowski from 120 on Wisconsin and made a statement of his
intention to run for the aldermanic seat in Spring.
Reports and Comments from the Mayor
Aultman Kloth expressed best wishes to her son on his golden birthday.
Adjourn
Motion to adjourn made by Ellis and seconded by Jungwirth.
Motion carried 7-0-0.
The meeting adjourned at 8:35 PM.
Minutes taken by Gina Kozlik, City Clerk
7
V:\Stormwater\Development Projects (2016-Present)\Olde Highlander-Norden Range #7-
2023\ Easements\Memo - Olde Highlander Easements.docx1
MEMORANDUM
DEPARTMENT - PUBLIC WORKS
Date: November 3, 2026
To: Mayor and Common Council
From: Jason Herzog P.E., City of Oconomowoc
Re: City of Oconomowoc Easements in Olde Highlander
RELATES TO THE STRATEGIC PLAN
n/a
BACKGROUND
These easements are needed to outline 2 wastewater and water utility easements, an electrical
easement, and a public access easement / maintenance agreement along Glasgow Road, Bruce Drive,
and Wallace Loop.
ADDITIONAL ANALYSIS
n/a
FINANCIAL IMPACT
n/a
RECOMMENDATION
Staff recommend approval of the four easements.
SUGGESTED MOTION
Consent agenda item: Motion to approve the consent agenda.
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
MEMORANDUM
PUBLIC WORKS
Date: November 3, 2026
To: Mayor and Common Council
From: Jason Herzog, Director of Public Works
Re: Consider/Act on Resolution 26-R3420 Awarding Contracts for the 2026 Elevator Modernization
and Associated Electrical Work
RELATES TO THE STRATEGIC PLAN
Key Infrastructure & Facility Maintenance
BACKGROUND
The Elevator Modernization scope encompasses the complete removal of existing elevator components
and the installation of modern equipment.
The City of Oconomowoc Department of Public Works solicited separate, independent bids for the 2026
Elevator Modernization project and its associated Electrical Scope of Work at City Hall (174 East Wisconsin
Avenue). Per the bid specifications, the project requires direct contracting with two specialized firms, one
General Elevator Contractor and one Electrical Contractor who will coordinate to modernize existing
building facilities and bring all systems up to current code.
ADDITIONAL ANALYSIS
1. Elevator Modernization Bids
Contractor Base Bid Alternate 1 Total Amount
Metro Elevator
(Milwaukee, WI) $84,560.00 $13,520.00 $98,080.00
Express Elevator $108,120.00 $18,400.00 $126,520.00
MEI $116,425.00 — $132,825.00 (incl.
alternate/adjustments)
2. Electrical Work Bids
37
V:\City Projects\2026 Elevator Modernization\Background Memo for Elevator and Electrical Moderization.docx2
Contractor Bid Amount Status / Notes
Total Mechanical (Milwaukee, WI) $32,235.00 Responsive / Lowest Bidder
Midwest Electrical $49,780.00 Responsive
Wil-Surge Electric Incomplete Disqualified
FINANCIAL IMPACT
The total combined award for the base elevator work ($84,560.00), Alternate 1 Cab Upgrade ($13,520),
and electrical work ($32,235.00) equals $130,315.00. Staff recommend including a 10% contingency for a
total of $143,346.50. which falls within the established project budget of $150,000.00.
RECOMMENDATION
Motion to approve Resolution 26-R3420 awarding the 2026 Elevator Modernization contract to Metro
Elevator and the Electrical Work contract to Total Mechanical.
SUGGESTED MOTION
Consent Agenda Item, Motion to approve the Consent Agenda
38
RESOLUTION NO. 26-R3420
RESOLUTION AWARDING CONTRACTS FOR THE 2026 ELEVATOR MODERNIZATION
PROJECT AND ASSOCIATED ELECTRICAL WORK
WHEREAS, the City of Oconomowoc Department of Public Works solicited separate,
independent bids for an Elevator Modernization project and its corresponding Electrical Scope
of Work at City Hall; and
WHEREAS, bids were received, publicly opened, and read aloud on October 22, 2026,
in accordance with published legal notices; and
WHEREAS, bids received for the general elevator modernization work were reviewed for
compliance and evaluated, resulting in the following totals including Base Bid and Alternate 1:
Metro Elevator (Milwaukee, WI): $98,080.00 (Base Bid: $84,560.00; Alternate 1:
$13,520.00)
Express Elevator: $126,520.00 (Base Bid: $108,120.00; Alternate 1: $18,400.00)
MEI: $132,825.00 (Base Bid: $116,425.00)
WHEREAS, the bids received for the electrical scope of work were reviewed, resulting in
the following totals:
Total Mechanical (Milwaukee, WI): $32,235.00
Midwest Electrical: $49,780.00
Wil-Surge Electric: Incomplete bid (Disqualified)
WHEREAS, City staff and the Public Services Committee recommend accepting the
proposal of Metro Elevator including Alternate 1 in the amount of $98,080.00 and the proposal
of Total Mechanical in the amount of $32,235.00 for the respective project scopes.
NOW THEREFORE, BE IT HEREBY RESOLVED that the proposal of Metro Elevator in
the sum of $98,080.00 for the general elevator modernization work and the proposal of Total
Mechanical in the sum of $32,235.00 for the electrical scope of work, total cost of $130,315.00
be and the same are hereby accepted, and appropriate City officials are authorized to enter into
contracts with them for said work.
BE IT FURTHER RESOLVED this is a Not-to-Exceed price proposal with a 10%
contingency of $13,031.50, total combined project cost including contingency of $143,346.50,
which is within the established project budget of $150,000.00.
BE IT FURTHER RESOLVED this resolution not become effective and no notice of
award be issued unless and until an appropriate performance bond and a certificate of
insurance are filed with the City Clerk.
DATED:________________ CITY OF OCONOMOWOC
By:_________________________
Matt Rosek, Mayor
ATTEST:
_____________________________
Gina Kozlik, Clerk
39
P:\Committee and Council\Memos\Consider Act on Cooney Substation Electrical Panel Replacement Award to Midwest Electric - Rev1.docx
MEMORANDUM
ELECTRIC UTILITY
Date: November 3, 2026
To: Mayor, Common Council and Utility Committee
From: Kevin Kaari, Utility Manager
Re: Consider/Act on Resolution 26-R3416 Awarding Cooney Substation Electrical Panel
Replacement
RELATES TO THE STRATEGIC PLAN
Strategic Goal II Improve and Maintain our Facilities
BACKGROUND
The electrical panel at Cooney Substation experienced an unexpected main breaker failure in spring of
2026. This electrical panel supplies the normal and back-up auxiliary power needs of the control building,
relays, transformer fans, heaters, lighting, and HVAC equipment. Staff immediately found a refurbished
breaker but learned the panel and related equipment are obsolete and should be replaced to avoid future
failure problems.
The scope of work to replace the panel requires coordination with the American Transmission Company
(ATC) who also has equipment at the substation. Therefore, timing and coordination of the work is a critical
consideration.
Request for quotes were solicited to Midwest Electric, Edge Electric, Filuit Electric and KRL Electric. Due
to the timing coordination required for this project, Filuit Electric could not provide proper staff levels to
accomplish the work timely and KRL Electric declined due to the specialty nature of the work.
The two qualified vendors provided the following quotes:
*Midwest Electric $ 25,940.00
Edge Electric $ 21,983.00
*Midwest provided an optional quote for replacing the automatic transfer switch for an additional $2,840.00
that staff recommend we include.
While the higher price, Midwest Electric has the best overall understanding of the project and would best
serve the City’s needs to complete this in timely fashion with quality products and professional services.
FINANCIAL IMPACT
Midwest Electric’s quote for $25,940.00 and the additional automatic transfer switch for $2,840, totaling
$28,780.00, is within the 2026 operations budget for substation maintenance outside services fund 603-
573-6592-210.
40
P:\Committee and Council\Memos\Consider Act on Cooney Substation Electrical Panel Replacement Award to Midwest Electric - Rev1.docx
RECOMMENDATION
Motion to recommend to the Common Council award of the Cooney Substation Electrical Panel
Replacement to Midwest Electric, including the optional auto transfer switch, for a total of $28,780.00.
SUGGESTED MOTION
Consent Agenda item, motion to approve the Consent Agenda
41
P:\Committee and Council\Resolutions\Resolution 26-R3416 Cooney Substation Electrical Panel Replacement Award to Midwest
Electric.docx
RESOLUTION NO. 26-R3416
RESOLUTION APPROVING COONEY SUBSTATION ELECTRICAL PANEL
REPLACEMENT AWARD TO MIDWEST ELECTRIC
WHEREAS, the electrical panel at Cooney Substation failed in spring of 2026; and
WHEREAS, the refurbished replacement panel and related equipment is obsolete; and
WHEREAS, the panel is critical to Cooney Substation power needs in the control room,
relays, transformer fans, heaters, lighting and HVAC system; and
WHEREAS, Midwest Electric is the most qualified vendor to supply a quote; and
WHEREAS, the Midwest Electric quote of $28,780.00 is within the 2026 substation
maintenance operations budget for professional services;
NOW THEREFORE, BE IT HEREBY RESOLVED, Common Council approves the
Cooney Substation electrical panel replacement award to Midwest Electric.
DATED: November 3, 2026 CITY OF OCONOMOWOC
By: _______________________
Matt Rosek, Mayor
ATTEST:
______________________
Gina Kozlik, Clerk
42
Y:\Insurance\Claims Filed\Liability\2026 8.07 Meckl\Background Memo for Denial of Claim by Meckl.docx
MEMORANDUM
FINANCE DEPARTMENT
Date: November 3, 2026
To: Mayor and Common Council
From: Steve Hatton, Finance Director
Re: Consider/act on Resolution 26-R3419 for Denial of Claim by A Meckl
RELATES TO THE STRATEGIC PLAN
Strategic Goal-NA
BACKGROUND
On August 13, 2026, we received a “Notice of Claim” submitted by Andreas V Meckl of W351N5461
Lake Drive, Oconomowoc, WI 53066. Mr. Meckl is claiming damage to the inner tube of his e-bike due to
the condition of the right-hand lane of West-bound East Wisconsin Avenue between the Burger King and
VFW.
The City filed the claim with the Claims Division of our insurance carrier, Statewide Services Inc., and
DPW crew were dispatched.
ADDITIONAL ANALYSIS
The DPW crew reported finding a few potholes in the area but stated nothing appeared major or deep.
Cold-mix asphalt was applied to fill any voids possible. They revisited the area again on August 19, 2026,
to check the area again and reported no areas of concern found.
Based on the insurance and staff investigation, the pothole had never been reported to the City prior to
the incident. As a result, the City had no notice of the condition and therefore had no opportunity to
inspect, repair, or otherwise remedy the defect before the incident occurred.
FINANCIAL IMPACT
N/A
RECOMMENDATION
It is recommended that the City of Oconomowoc Council disallow this claim pursuant to the Wisconsin
Statute for disallowance of claim 893.80. The disallowance of the claim in this manner will allow us to
shorten the statute of limitations period to six months.
SUGGESTED MOTION
Motion to approve Resolution 26-R3419.
43
RESOLUTION NO. 26-3419
RESOLUTION DISALLOWING CLAIM
WHEREAS, on August 13, 2026, the City of Oconomowoc received a claim of damages
from Andreas V Meckl asserting damage to his bicycle inner tube due to condition of the
roadway on the right-hand west-bound lane of East Wisconsin Avenue between 830 and 860 E
Wisconsin Avenue; and
WHEREAS, said claim has been considered by the City of Oconomowoc and was referred
to the Claims Division of Statewide Services, Inc., which company administers claims for the
League of Wisconsin Municipalities Mutual Insurance Company; and
WHEREAS, Statewide Services, Inc. recommends that the City of Oconomowoc deny this
claim pursuant to §893.80 Wis. Stats.; and
WHEREAS, it is therefore the opinion of the City of Oconomowoc, without objection,
direction, or instruction to the contrary from Statewide Services, Inc., that the claim has no merit
and should be denied.
NOW THEREFORE, BE IT HEREBY RESOLVED the claim from Andreas V Meckl, that the City
has no liability in the incident, and be hereby denied.
BE IT FURTHER RESOLVED the City Clerk is hereby instructed to serve a certified copy of
this Resolution Disallowing Claim upon the claimant by certified mail with restricted delivery.
DATED: November 3, 2026, CITY OF OCONOMOWOC
By: __________________________
Matt Rosek, Mayor
ATTEST:
Gina Kozlik, Clerk
44
NOTICE OF DISALLOWANCE OF CLAIM
Via Certified Mail
Return Receipt Requested
To:
PLEASE TAKE NOTICE that the Common Council of the City of Oconomowoc at its
regular meeting on November 3, 2026, voted to deny the claim dated August 13, 2026, for
damages, pursuant to the provisions of §893.80, Stats.
This Notice of Disallowance of Claim is being served pursuant to the provisions of
§893.80(1g), Stats.
PLEASE TAKE FURTHER NOTICE that §893.80(1g) provides that no action on a claim
against a municipal corporation, nor against any officer, official, agent or employee, may be
brought after six (6) months from the date of service of this notice.
DATED: November 3, 2026 CITY OF OCONOMOWOC
By:
Gina Kozlic, City Clerk
C: Attorney Stan Riffle
45
S:\Licenses\License Approvals\2025\5-6-25.doc
LICENSE APPROVALS
Honorable Mayor and Common Council: November 3, 2026
The following license applications have been received by the City Clerk, accompanied by
the proper fee and approved by the Oconomowoc Police Department:
Change of Agents
Lutheran Homes of Oconomowoc
1305 W. Wisconsin Ave
Kristin R. Timmer, Agent
1486 Mackenzie Lane
Solveson Moos Abrahamson VFW Post 2260
830 E. Wisconsin Ave
Frank J. Mirenda, Agent
W383 N6610 Deer Creek Ct
46
1
MEMORANDUM
FINANCE DEPARTMENT
Date: November 3, 2026
To: Mayor and Common Council
From: Steve Hatton, Finance Director
Re: Consider/act on the Adoption of the City of Oconomowoc 2027 Annual Budget
RELATES TO THE STRATEGIC PLAN
N/A
BACKGROUND
A balanced preliminary 2027 Budget was delivered to Council on September 15. The budget was reviewed
in detail on October 13 during a Committee of the Whole budget workshop. The motion taken at that
meeting to amend the preliminary budget for the use of Tourism funds in the amount of $6,200 is
incorporated into the proposed 2027 Budget.
ADDITIONAL INFORMATION
The 2027 budget preserves the City’s service levels and makes strategic investments in public safety and
infrastructure, aligning with long-term financial stability goals. The budget complies with State Levy Limits
and enhances public safety, through the addition of an additional Police officer and additional funding for
Fire/EMS services. The funding of these area ensures the City continues to provide a high quality of life
for its residents.
The City of Oconomowoc has a long history of being fiscally responsible and financially stable. With the
recommended 2027 budget, that tradition remains intact.
FINANCIAL IMPACT
The proposed 2027 Annual Budget is summarized in the attached Public Notice. The overall City
property tax levy will increase by $1,057,733 compared to the 2026 budget. This increase is driven
primarily by a 5.18% growth in net new construction and increased Fire/EMS costs. Below is a summary
of changes from 2025-2026:
47
2
The City portion of the tax bill for an average home valued at $455,000 is estimated to remain
unchanged at $4.16 per $1,000 of assessed value or $1,891 annually.
Approval of the Capital Budget occurred on August 18, 2026. Since the approval, the need for six
changes has been identified during the development of the operating budget. These changes are shown
below.
The Utility items were reviewed at the October 20, 2026 Committee of the Whole meeting and included in
the recommendation for approval. All other Capital items remain unchanged. An amended summary
schedule for the 2027 City and Utility Capital Budgets and Funding Plans are attached.
RECOMMENDATION
It is recommended that the Common Council adopts the City of Oconomowoc 2027 Budget as
presented.
SUGGESTED MOTION
Motion to approve the 2027 Budget as presented.
2025 2026 $ %
City Levy Levy Levy Change Change
General Fund Operations* 8,146,407 8,636,850 490,443 6.0%
Debt Service Payments* 2,592,081 2,634,181 42,100 1.6%
City Capital Projects 1,472,355 1,664,238 191,883 13.0%
Fire/EMS Operations 4,213,924 4,524,209 310,285 7.4%
Fire/EMS Capital Projects 477,645 500,667 23,022 4.8%
Total City Levy 16,902,412 17,960,145 1,057,733 6.3%
Assessed Value** 4,345,276,800 4,577,479,100 232,202,300 5.3%
* 2026 Adjusted to to match 2027 treatment as direct Debt Service Fund Levy revenue
** 2026 Assessed value is preliminary until Manufacturing values are equated
Capital Original Updated
Budget Description Cap Plan Budget Change Notes
Wastewater Wastewater GIS 30,000 - (30,000) Moved to Operating Expense
Wastewater Pump Station & WWTP Building Repair 70,000 - (70,000) Moved to Operating Expense
Wastewater Scum Pump Replacement 22,000 - (22,000) Urgent Need, moved up to 2026
Water Lead Lateral (Public-Side) Replacements 75,000 200,000 125,000 Increased project activity
Water Water Meter Head Replacements - 22,000 22,000 Added needed project
City Annual Capital Contribution for WLFD 652,000 650,667 (1,333) Trued up to WLFD Budget
23,667
48
Published: Thursday, October 15, 2026
2026 2027 Percent
Budget Budget Change
218,050$ 228,050$
12,000 12,000
3,153,893 3,210,759
1,460,200 1,482,700
294,500 287,500
773,595 775,843
3,950 3,950
772,285 816,889
6,688,473 6,817,691 1.9%
12,496,181 13,011,059 4.1%
1,806,000 1,877,795
600,000 673,500
21,590,654$ 22,380,045$ 3.7%
EXPENDITURES, OTHER FINANCING USES AND FIRE RESERVES:
2,141,095$ 2,002,919$
10,124,919 11,468,459
3,357,979 3,449,901
139,905 127,406
1,414,967 1,507,826
2,483,698 2,551,766
560,094 598,269
20,222,658 21,706,545 7.3%
885,850 673,500
482,146 -
21,590,654$ 22,380,045$ 3.7%
The 2027 proposed budgets for all funds combined:
2026
Budget
2027
Budget
General Fund $14,071,942 $21,706,545 $22,380,045 $13,398,442 $12,496,181 $13,011,059
Fire & Ambulance Reserve Fund 1,292,617 5,000 150,000 1,147,617
Garbage and Refuse Special Revenue Fund 525,244 1,363,225 1,476,513 411,956
Woodcreek Stormwater Fund 123,108 8,451 8,599 122,960
River Watershed Fund 191,903 432,754 432,754 191,903
Transportation Facilities Impact Fee Fund (833,974) 159,000 30,000 (704,974)
Law Enforcement Facilities Impact Fee Fund 460,819 157,000 314,100 303,719
Park & Recreation Facilities Impact Fee Fund 2,735,988 710,000 515,000 2,930,988
Police Equipment Donations Fund 8,116 - 400 7,716
K9 Fund 9,288 500 9,514 274
Community Development Authority Fund 49,664 100 10,000 39,764
Tourism Fund 615,579 567,100 736,344 446,334
Debt Service Fund 337,412 4,974,564 4,974,564 337,412 2,306,231 2,634,181
T.I.D. #8 Capital Projects Fund (1,644) - 150 (1,794)
T.I.D. #4 Capital Projects Fund 803,957 5,000 808,957 -
T.I.D. #5 Capital Projects Fund (294,697) 857,386 42,013 520,676
T.I.D. #6 Capital Projects Fund (69,430) 509,735 1,202,763 (762,459)
T.I.D. #7 Capital Projects Fund 7,404,330 1,659,903 6,757,451 2,306,782
Capital Improvements Fund 6,345,575 3,517,286 5,983,799 3,879,062 2,100,000 2,314,905
Wastewater Utility 90,332,135 9,196,717 6,686,196 92,842,656
Water Utility 52,124,394 7,696,329 5,635,374 54,185,349
Electric Utility 64,818,600 32,222,929 29,375,958 67,665,571
Technology Internal Service Fund 1,008,257 1,054,350 1,154,282 908,325
Risk Management Internal Service Fund 256,418 798,286 798,286 256,418
Fleet Maintenance Internal Service Fund 274,798 893,576 893,576 274,798
Total All Funds $242,590,400 $88,495,736 $90,376,638 $240,709,496 $16,902,412 $17,960,145
Percent Change -0.8% 6.3%
2026 2027 $ Change % Change
Estimated Equalized Value Property Tax Rate $4.11 $4.05 -$0.06 -1.6%
Estimated Assessed Value Property Tax Rate $4.16 $4.16 $0.00 0.0%
General Obligation Notes and Bonds $53,640,000
Unsecured Debt -
Mortgage Revenue Bonds -
Utility Revenue Bonds 8,134,322
Total Debt $61,774,322
RESIDENTS AND TAXPAYERS, please take notice that the Common Council of the City of Oconomowoc has scheduled a public hearing on the proposed 2027 budget. The hearing will be held in
the Council Chambers on the second floor of City Hall, 174 E. Wisconsin Ave., Oconomowoc, WI, at 7:30 p.m. on November 3, 2026.
CITY OF OCONOMOWOC
ADOPTED BUDGET SUMMARY
LEGALLY REQUIRED PUBLICATION
Total Revenues Excluding Property Taxes
GENERAL FUND SUMMARY BY CATEGORY
The 2026 adopted and 2027 adopted General Fund budgets are as follows:
REVENUES, OTHER FINANCING SOURCES AND FUND BALANCE APPLIED:
Taxes (other than property taxes)
Special Assessments
Intergovernmental Revenues
Licenses and Permits
Fines, Forfeits and Penalties
Public Charges for Services
Interfund Charges for Services
Miscellaneous Revenues
Conservation and Development
General Property Taxes
Other Financing Sources
Fund Balance Applied
TOTAL REVENUES, OTHER FINANCING SOURCES
AND FUND BALANCE APPLIED
General City Government
Public Safety
Public Works
Health and Human Services
Library
Parks and Recreation
Total Expenditures
Other Financing Uses
TOTAL EXPENDITURES, OTHER FINANCING USES AND FIRE RESERVES
SUMMARY BY FUND
Fund
Balance
January 1
Total
Revenues
Total
Expend
Fund
Balance
December 31
Property Tax Contribution
The City's outstanding debt at December 31, 2026 is projected to be:
If a person with a disability requires that the meeting be accessible or that materials at the meeting be in an accessible format, call the City Clerk's office at 569-2186, at least 48 hours prior to the
meeting to request adequate accommodations.
Interested persons may attend the hearing in person or submit their opinions to the City Clerk, in writing, prior to the hearing.
Gina Kozlik, City Clerk
City of Oconomowoc
Fire Reserves
49
CAPITAL IMPROVEMENT PLAN 2027-2031
SCHEDULE OF CAPITAL PROJECTS - CITY FUNDS
Tab # Fund Dept Type Funding Description 2027 2028 2029 2030 2031
Clerk1 CapProj Clerk Other Equipment CP Reserve Badger Books Purchase-Electronic Poll Book/Voter Check-In 58,632$
Clerk2 CapProj Clerk Bldg & Grounds CP Reserve Customer Service Window & Workstat ion Improvements 52,000$
Tech 1 Technology Technology Other Equipment Tech ReserveIT Upgrades 75,000$ 81,500$ 66,550$ 73,205$ 80,526$
WLFD 1 CapProj Fire/EMS Other Equipment Fire Reserve Capital Contribution to Western Lakes Fire District 650,667$ 678,100$ 704,200$ 732,000$ 762,200$
Police 1 CapProj Police Fleet Other Squad Car Replacement 84,000$ 93,500$ 187,000$ 95,000$ 95,000$
Police 2 CapProj Police Other Equipment Levy Virtual Reality Software Program 53,498$
Police 3 CapProj Police Other Equipment Levy Crosswalk System 21,540$ 21,540$
Police 5 CapProj Police Bldg & Grounds Levy Update HVAC System 52,500$
Police 6 CapProj Police Bldg & Grounds Levy Remodel Clerical Area 52,500$
Police 7 CapProj Police Bldg & Grounds Levy Entry A ccess Fobs & Card Control 30,000$
Police 8 CapProj Police Bldg & Grounds Levy UPS Battery B ackup 20,000$
DPW 1 CapProj DPW Other Levy Adaptive Management Program 75,000$ 75,000$ 75,000$ 75,000$ 75,000$
DPW 2 CapProj DPW Fleet Levy Pickup #92 85,000$
DPW 3 CapProj DPW Fleet Equipment Levy Lake Barge with Outboard 180,000$
DPW 4 CapProj DPW Fleet Levy Plow Truck #47 330,000$
DPW 5 CapProj DPW Fleet Levy 1 Ton Dump Truck #39 115,000$
DPW 6 CapProj DPW Fleet Levy Plow Truck #54 330,000$
DPW 7 CapProj DPW Fleet Levy Backhoe Loader #29 200,000$
DPW 8 CapProj DPW Fleet Levy 1 Ton Dump Truck #36 115,000$
DPW 9 CapProj DPW Fleet Equipment FLD Reserve Aquarius Lake Weed Harvestor 300,000$
DPW 10 CapProj DPW Fleet Equipment FLD Reserve Aquarius Lake Transport 290,000$
DPW 11 CapProj DPW Fleet Equipment FLD Reserve Aquarius Shore Conveyor 88,000$
DPW 12 CapProj DPW Infrastructure Levy DESIGN Street Program 125,000$ 125,000$ 125,000$ 125,000$ 125,000$
DPW 13 CapProj DPW Infrastructure Levy Street Maintenance Program 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$
DPW 14 CapProj DPW Infrastructure Debt Major Street Replacement Plan 2,000,000$ 2,000,000$ 2,000,000$ 2,000,000$ 2,000,000$
DPW 15 CapProj DPW Bldg & Grounds Levy Second Salt Shed 300,000$
DPW 16 HwyImpact DPW Fleet Levy Additional Plow Truck -$ 330,000$
DPW 17 CapProj DPW Fleet Levy Pickup Truck #73 a 2019 Chevy Silverado 55173 -$ 65,000$
DPW 18 CapProj DPW Bldg & Grounds Levy Brine Making Machine - not fleet - Buildin g & Grounds 50,000$
DPW 19 CapProj DPW Fleet Equipment Levy Replace Vibratory Roller and add Trailer 90,000$
DPW 20 CapProj DPW Fleet Equipment Levy Replace 2020 J ohnston Sweeper #16 450,000$ -$
DPW 21 CapProj DPW Bldg & Grounds Debt Storage Building 85,000$
DPW 22 CapProj DPW Bldg & Grounds Levy City Hall Flat Roof Repl acement 50,000$
DPW 23 CapProj DPW Fleet Levy Plow Truck #51 a 2014 International 55051 330,000$
DPW 24 CapProj DPW Bldg & Grounds Levy Repl ace Uninterruptible Power Supply (UPS) at City Hall 80,000$
DPW 25 CapProj DPW Bldg & Grounds Levy Restore F aces on the City Hall Clock Tower 50,000$
Library 1 CapProj Library Bldg & Grounds rants/Donatio Satellite Branch Start-Up Costs 156,000$
Library 2 CapProj Library Bldg & Grounds Levy Fire System Repl acement 100,000$
Parks 1 ParkImpact Parks Infrastructure Impact Fee NE Regional Park Development - Pha se 2 515,000$
Parks 2 CapProj Parks Bldg & Grounds Levy Tennis Court Resurfacing 40,000$ 40,000$
Parks 3 CapProj Parks Bldg & Grounds Levy Scout Houses Siding Repl acement 19,000$ 48,000$
Parks 5 CapProj Parks Infrastructure CP Reserve Bike/Ped Trail connections 600,000$ 200,000$ 2,500,000$
Parks 6 CapProj Parks Bldg & Grounds Levy Park Shelter Picnic Table Repl acement 45,000$
Parks 7 CapProj Parks Fleet Equipment Levy 3WD Super Rake #80 replacement 52,000$
Parks 8 ParkImpact Parks Fleet Equipment Impact Fee Additional New Wide Area Mower 115,000$
Parks 9 CapProj Parks Fleet Equipment Levy 2008 Toro Herbicide Sprayer 35,000$
Parks 10 CapProj Parks Fleet Equipment Levy 2012 SmithcoAthletic Field C onditioner 41,000$
Parks 11 CapProj Parks Fleet Levy Truck #81 - 2011: Silverado C2500 3/4 ton 95,000$
Parks 12 CapProj Parks Fleet Equipment Levy 2015 JCB Mini Loader replacement 180,000$
Parks 13 CapProj Parks Fleet Equipment Levy Stand Up Mower (replaces 2 walk behinds ) 21,000$
Parks 14 CapProj Parks Fleet Equipment Levy 2015 Massey Ferguson Tractor replacemen t 64,000$
Parks 15 CapProj Parks Fleet Levy 2011 Ford F550 #91 with Forestry Body 180,000$
Parks 16 CapProj Parks Other Equipment Levy River Bluff Park Playground 60,000$
Parks 17 CapProj Parks Fleet Equipment Levy Floor Scrubber 14,000$
Parks 18 CapProj Parks Fleet Equipment Levy Fecon Head Attachment for John Deere 19 0 40,000$
Parks 19 CapProj Parks Fleet Equipment Levy 2018 K ubota RTV 35,000$
Parks 20 CapProj Parks Bldg & Grounds Levy Community Center Porch/Balcony Resurfaci ng 25,000$
Parks 21 CapProj Parks Fleet Levy 2013 Chevy Silverado K3500 with plow #102 90,000$
Parks 22 CapProj Parks Fleet Equipment Levy 1979 J ohn Deere Tractor Replace w/Toro Outcross 9060 85,000$
Parks 23 CapProj Parks Fleet Equipment Levy 2013 JCB Skid Steer 85,000$
Parks 24 CapProj Parks Bldg & Grounds Levy Roosevelt Field Netting System Repl acement 40,000$
Parks 25 CapProj Parks Bldg & Grounds Levy Champion Field Park Park Updates 275,000$ 250,000$
Parks 26 CapProj Parks Bldg & Grounds Levy Chapman Barn Restoration 40,000$
Parks 27 CapProj Parks Bldg & Grounds Levy Fowler Park Pathway Extension 90,000$
6,573,799$ 5,909,640$ 8,503,250$ 5,254,243$ 4,667,726$
Update 2027-2031
Y:\Budget\Budget 2027\Capital\COW Workshop\City Capital Worksheets 2027-2031.xlsx, Council Plan 1
50
2027 City Capital Project Funding Plan
Fund Dept Description 2027 Exp Levy Debt Reserves Grant /
Dontation
Impact
Fees Other 2027
Total
408-Cap Proj Cler k Badger Books Electronic Poll Books 58,632 - - 58,632 - - - 58,632
Clerk Customer Service Window 52,000 - - 52,000 - - - 52,000
Fire/EMS Annual Capital Contribution for WLFD 650,667 500,667 - 150,000 - - - 650,667
Police Squad Car Replacement 84,000 74,000 - - - - 10,000 84,000
Update HVAC System 52,500 52,500 - - - - - 52,500
UPS Battery Back Up 20,000 20,000 - - - - - 20,000
DPW Adaptive Management 75,000 75,000 - - - - - 75,000
Replace 2002 Freightliner Snow Plow Truck # 47 330,000 330,000 - - - - - 330,000
Replace Backhoe Loader # 029 a 2004 John Deere 410G 200,000 200,000 - - - - - 200,000
Design Street Program 125,000 125,000 - - - - - 125,000
Street Maintenance Program 1,000,000 326,500 - - - - 673,500 1,000,000
Major Street Replacement Plan 2,000,000 116,238 1,883,762 - - - - 2,000,000
Restore Faces on the City Hall Clock Tower 50,000 50,000 - - - - - 50,000
Storage Building (Utilities, DPW and Parks) 85,000 - 85,000 - - - - 85,000
Library Satellite Branch Start-Up Costs 156,000 - - - 156,000 - - 156,000
Fire System Replacement 100,000 100,000 - - - - - 100,000
Parks Scout Houses Siding Replacement 19,000 19,000 - - - - - 19,000
NE Corridor Bicycle and Pedestrian Overpass 600,000 - - 500,000 100,000 - - 600,000
3WD Super Rake #80 replacement 52,000 52,000 - - - - - 52,000
2015 JCB 409 Mini Wheeled Loader #5 180,000 180,000 - - - - - 180,000
Floor Scrubber 14,000 14,000 - - - - - 14,000
Roosevelt Field Netting Post Replacement 40,000 40,000 - - - - - 40,000
Chapman Barn Restoration 40,000 40,000 - - - - - 40,000
408-Cap Proj Total 5,983,799 2,314,905 1,968,762 760,632 256,000 - 683,500 5,983,79 9
700-Tech Technology IT Upgrades 75,000 - - 75,000 - - - 75,000
700-Tech Total 75,000 - - 75,000 - - - 75,000
223-Park Parks NE Regional Park Phase 2 515,000 - - - - 515,000 - 515,000
223-Park Total 515,000 - - - - 515,00 0 - 515,000
Grand Total 6,573,799 2,314,905 1,968,762 835,632 256,000 515,000 683,50 0 6,573,79 9
51
2027-2028 Fleet Items
Tab # Dept Description 2027 2028
DPW 3 DPW Lake Bar ge with Outboard 180,000
DPW 4 DPW Plow Truck #47 330,000
DPW 5 DPW 1 Ton Dump Truck #39 115,000
DPW 6 DPW Plow Truck #54 330,000
DPW 7 DPW Backhoe Loader #29 200,000
DPW 8 DPW 1 Ton Dump Truck #36 115,000
Parks 10 Parks 2012 SmithcoAthletic Field Conditioner 41,000
Parks 11 Parks Truck #81 - 2011: Silverado C2500 3/4 ton 95,000
Parks 12 Parks 2015 JCB Mini Loader replacement 180,000
Parks 7 Parks 3WD Super Rake #80 replacement 52,000
Police 1 Police Squad Car Replacement 84,000 93,500
Elec 15 Electric Replace T44 Trailer a 2004 Contrail 60,000
Elec 16 Electric Replace Zero Turn Mower ZT2 a 2015 Grasshopper 10,000
Elec 19 Electric Replace 2017 Small Aerial Truck #15 (63115) 225,000
Elec 23 Electric Replace 2020 Vermeer Bore Ri g #63043 500,000
Elec 24 Electric Replace 2018 Bobcat E45 Mini Excavator #63148 120,000
Elec 25 Electric Modif y 2020 Chevy 4500 Truck #106 for Updated Bed 10,000
Water 10 Water Replace H ydro Exc Truck 2011 Freightliner #58 63058 375,000
Water 20 Water Cold Storage Building (Water Utility Portion) 28,300 -
Water 9 Water Replace Crew Truck # 9 2016 Ford 95,000
WWTP 17 WWTP Replace Zero Turn Mower ZT2 a 2015 Grasshopper 10,000
WWTP 8 WWTP Replace Truck #87 2010 Ford 60,000
Total 1,939,300 1,369,500
Above items approved for delivery/payment in year indicated. Orders may be placed ealier, but delivery and payment must
occur in above budget year. Highlighted truck updated from #38 to #54 following 2026 purchase of 2 used City of Waukesha
Trucks
52
CAPITAL IMPROVEMENT PLAN 2027-2031
SCHEDULE OF CAPITAL PROJECTS - UTILITY FUNDS
Page # Dept Type Funding Description 2027 2028 2029 2030 2031
WWTP 1 WWTP Infr Revenues Sewer Main (In Conjunction w/ Streets) 500,000$ 500,000$ 550,000$ 550,000$ 550,000$
WWTP 2 WWTP Infr ERF Treatment Plant Upgrades-HVAC 75,000$ 15,000$ 15,000$ 15,000$
WWTP 4 WWTP Infr Reserves Madison Lift Station - Purchase and installation of 3rd pump 180,000$ 80,000$
WWTP 6 WWTP Equip Reserves Lift Station pump/mechanical updates 48,000$ 50,000$ 50,000$ 50,000$ 50,000$
WWTP 7 WWTP Equip Reserves Lift Station control panel & associated equipm ent 80,000$ 80,000$ 80,000$ 80,000$ 80,000$
WWTP 8 WWTP Fleet Reserves Replace Truck #87 2010 Ford 60,000$
WWTP 10 WWTP Equip ERF Replacement of chemical feed pump 18,000$ 18,000$
WWTP 11 WWTP Equip Revenues Influent pump rebuilds - schedule 24,000$ 25,000$ 26,000$
WWTP 15 WWTP Equip ERF Grit pump replacement 35,000$
WWTP 19 WWTP Equip ERF Ortho-Phosphate Analyzer 33,000$
Elec 1 Electric Infr New Services 180,000$ 190,000$ 190,000$ 190,000$ 190,000$
Elec 2 Electric Infr Primary Extensions 275,000$ 275,000$ 275,000$ 275,000$ 275,000$
Elec 3 Electric Infr Voltage Conversion 250,000$ 250,000$
Elec 4 Electric Infr Cooney replacement breakers 232,000$
Elec 5 Electric Infr Annual Street Project Relocations 50,000$ 50,000$ 50,000$ 50,000$ 50,000$
Elec 6 Electric Infr Auto Transfer Switches 300,000$
Elec 7 Electric Infr Cable Replacement 300,000$ 300,000$ 300,000$ 300,000$ 300,000$
Elec 8 Electric Infr Overhead to Underground Conversions 25,000$ 25,000$ 25,000$ 25,000$ 25,000$
Elec 9 Electric Infr Street Light Additions/Replacements 50,000$ 50,000$ 50,000$ 50,000$ 50,000$
Elec 10 Electric Equip Electric Meters - New & Replacement 250,000$ 250,000$ 400,000$ 400,000$ 250,000$
Elec 11 Electric Equip Transformers - New & Replacement 750,000$ 750,000$ 750,000$ 750,000$ 750,000$
Elec 12 Electric Fleet Replace Truck #8 2015 - Foreman Pickup 55,000$
Elec 13 Electric Fleet Replace T33 2007 Sauber 3 reel turret trailer 70,000$
Elec 14 Electric Fleet Replace TBC21 2004 Butler mini excavator trailer 20,000$
Elec 15 Electric Fleet Replace T44 Trailer a 2004 Contrail 60,000$
Elec 16 Electric Fleet Replace Zero Turn Mower ZT2 a 2015 Grasshopper 10,000$
Elec 17 Electric Infr Utility Building 50,000$ 2,000,000$
Elec 18 Electric Infr Cold Storage Building (Electric Utility Portion) 56,700$ -$ -$ - $ - $
Elec 19 Electric Fleet Replace 2017 Small Aerial Truck #15 (63115) 225,000$
Elec 20 Electric Infr Distribution Outage Repair Upgrades 175,000$ 175,000$ 175,000$ 175,000$ 175,000$
Elec 21 Electric Infr Relight South Main 125,000$ 125,000$
Elec 22 Electric Infr Replace Cooney T8 - 50 yrs old in '29 100,000$ 3,000,000$
Elec 23 Electric Fleet Replace 2020 Vermeer Bore Rig #63043 500,000$
Elec 24 Electric Fleet Replace 2018 Bobcat E45 Mini Excavator #63148 120,000$
Elec 25 Electric Fleet Modify 2020 Chevy 4500 Truck #106 for Updated Bed 10,000$
Elec 26 Electric Fleet Replace 2001 Ingersoll Rand Portable Air Compressor 50,000$
Elec 27 Electric Fleet Replace 2018 Ram Crew Truck #13 100,000$
Elec 28 Electric Fleet Replace 2020 Bobcat E35 Mini Excavator 90,000$
Elec 29 Electric Equip Substation Battery Replacements 15,000$
Elec 30 Electric Equip Meter Testing Equipment 35,000$
Elec 31 Electric Infr Street Light Signal Upgrades 40,000$ 35,000$
Elec32 Electric Infr Berg Development - Allen/Morgan/Reddelein 2,000,000$
Water 1 Water Equip Water Meters 375,000$ 300,000$ 300,000$ 300,000$ 300,000$
Water 2 Water Infr Water Main (In Conjunction w/ Streets) 950,000$ 950,000$ 950,000$ 1,000,000$ 1,000,000$
Water 3 Water Infr Distribution Water Mains & Valves 100,000$ 100,000$ 100,000$ 100,000$ 100,000$
Water 4 Water Infr DNR Mandated Lead Service Line Replacement Program 200,000$ 200,000$ 200,000$ 200,000$ 200,000$
Water 5 Water Infr Well 2 Abandonment 200,000$ 100,000$
Water 6 Water Infr Well 9 site acquisition 50,000$ -$ 150,000$
Water 7 Water Infr Ground Storage Reservoir at Wells 4 & 6 750,000$ 3,000,000$
Water 8 Water Infr New Utility Building 25,000$ 1,000,000$
Water 9 Water Fleet Replace Crew Truck # 9 2016 Ford 95,000$
Water 10 Water Fleet Replace Hydro Excavator Truck 2011 Freightliner #58 63058 375,000$
Water 11 Water Fleet Replace Zero Turn Mower 2019 Grasshopper 63051-ZT3 20,000$
Water 13 Water Infr Well 7 Repipe 75,000$
Water 14 Water Fleet Replace Crane Truck 2009 Chevy #25 250,000$
Water 15 Water Infr Well #6 - Pull, Inspect, Repair or Replace all Pumping Equipment 50,000$
Water 16 Water Infr Well #4 - Pull, Inspect, Repair or Replace all Pumping Equipment 50,000$
Water 17 Water Infr Well #3 - Pull, Inspect, Repair or Replace all Pumping Equipment 50,000$
Water 18 Water Infr Well #1 - Pull, Inspect, Repair or Replace all Pumping Equipment 50,000$
Water 19 Water Fleet Replace Truck #12 2018 Ram 2500HD 62112 95,000$
Water 20 Water Fleet Cold Storage Building (Water Utility Portion) 28,300$ -$ -$ - $ - $
Water 21 Water Infr Water Meter Head Replacements 22,000$ -$ -$ - $ - $
7,252,000$ 7,315,000$ 8,486,000$ 8,153,000$ 7,610,000$
Y:\Budget\Budget 2027\Capital\COW Workshop\Utility Capital Worksheets 2027-2031.xlsx, Capital Util-Council Plan 1
53
2027 Utility Capital Funding Plan
Dept Page # Description
Fund
Revenues Reserves Other Debt 2027 Total
Electric Elec 1 New Services 180,000 - - - 180,000
Elec 2 Primary Extensions 275,000 - - - 275,000
Elec 3 Voltage Conversion 250,000 - - - 250,000
Elec 4 Cooney replacement breakers 232,000 - - - 232,000
Elec 5 Annual Street Project Relocations 50,000 - - - 50,000
Elec 6 Auto Transfer Switches 300,000 - - - 300,000
Elec 7 Cable Replacement 300,000 - - - 300,000
Elec 8 Overhead to Underground Conversions 25,000 - - - 25,000
Elec 9 Street Light Additions/Replacements 50,000 - - - 50,000
Elec 10 Electric Meters - New & Replacement 250,000 - - - 250,000
Elec 11 Transformers - New & Replacement 750,000 - - - 750,000
Elec 18 Cold Storage Building (Utilities, DPW and Parks) 56,700 - - - 56,700
Elec 20 Distribution Outage Repair Upgrades 175,000 - - - 175,000
Elec 21 Relight South Main 125,000 - - - 125,000
Elec 22 Replace Cooney T8 - 50 yrs old in '29 100,000 - - - 100,000
Elec 23 Replace 2020 Vermeer Bore Rig #63043 500,000 - - - 500,000
Elec 24 Replace 2018 Bobcat E45 Mini Excavator #63148 120,000 - - - 120,000
Elec 25 Modify 2020 Chevy 4500 Truck #106 for Updated Bed 10,000 - - - 10,000
Elec 30 Meter Testing Equipment 35,000 - - - 35,000
Elec 31 Street Light Signal Upgrades 40,000 - - - 40,000
Electric Total 3,823,700 - - - 3,823,700
Water Water 1 Water Meters 375,000 - - - 375,000
Water 2 Water Mains - In Conjunction w/Streets - - - 950,000 950,000
Water 3 Distribution Water Mains & Valve Extensions 100,000 - - - 100,000
Water 4 DNR Mandated Lead Service Line Replacements 200,000 - - - 200,000
Water 5 Well 2 Abandonment 200,000 - - - 200,000
Water 6 Well 9 Site Acquisition 50,000 - - - 50,000
Water10 Replace Hydro Excavator Truck 2011 Freightliner #58 63058 375,000 - - - 375,000
Water13 Well 7 Re-Pipe 75,000 - - - 75,000
Water 20 Cold Storage Building (Utilities, DPW and Parks) 28,300 - - - 28,300
Water 21 Water Meter Head Replacements 22,000 - - - 22,000
Water Total 1,425,300 - - 950,000 2,375,300
(blank) (blank) (blank) -
(blank) Total -
WWTP WWTP 1 Sewer Main (In Conjunction w/ Streets) 500,000 - - - 500,000
WWTP 2 Treatment Plant Upgrades-HVAC - 75,000 - - 75,000
WWTP 4 Madison Lift Station - Purchase and installation of 3rd pump - 180,000 - - 180,000
WWTP 5 Wastewater GIS - - - - -
WWTP 6 Lift Station pump/mechanical updates - 48,000 - - 48,000
WWTP 7 Lift Station control panel & associated equipment - 80,000 - - 80,000
WWTP 8 Replace Truck #87 2010 Ford - 60,000 - - 60,000
WWTP 9 Lift Station and WWTP Building Repair - - - - -
WWTP 10 Replacement of chemical feed pump - - 18,000 - 18,000
WWTP 11 Influent pump rebuilds - schedule 24,000 - - - 24,000
WWTP 15 Grit pump replacement - - 35,000 - 35,000
WWTP 19 Effluent Phosphorus Analyzer - - 33,000 - 33,000
WWTP Total 524,000 443,000 86,000 - 1,053,000
Grand Total 5,773,000 443,000 86,000 950,000 7,252,000
Y:\Budget\Budget 2027\Capital\COW Workshop\Utility Capital Worksheets 2027-2031.xlsx, PT Summary 2
54
1
MEMORANDUM
FINANCE
Date: November 3, 2026
To: Mayor and Common Council
From: Steve Hatton, Finance Director
Re: Consider/act on Setting the 2026 City of Oconomowoc Property Tax Levy for the 2027 Budget
RELATES TO THE STRATEGIC PLAN
N/A
BACKGROUND
In concert with approving the annual budget, the Common Council must take separate action to approve
the property tax levy for the City. The 2026 property tax levy for the 2027 budget is summarized below.
ADDITIONAL INFORMATION
The 2026 levy approved by the Common Council is levied on the 1/1/2026 assessed value of taxable real
property within the City. After combining with the other taxing jurisdictions (Waukesha County,
Oconomowoc Area School District, Waukesha County Technical College), the City will issue tax bills in
December 2026. The City collects property tax bill payments from residents and forwards the portions due
to other jurisdictions. The City portion of these collections represent revenue to fund the 2027 Budget.
FINANCIAL IMPACT
The City’s 2026 property tax levy for the 2027 budget is $17,960,145 broken out as follows:
RECOMMENDATION
Approve the 2026 City of Oconomowoc tax levy for the 2027 Budget at $17,960,145.
SUGGESTED MOTION
2025 2026 $ %
City Levy Levy Levy Change Change
General Fund Operations* 8,146,407 8,636,850 490,443 6.0%
Debt Service Payments* 2,592,081 2,634,181 42,100 1.6%
City Capital Projects 1,472,355 1,664,238 191,883 13.0%
Fire/EMS Operations 4,213,924 4,524,209 310,285 7.4%
Fire/EMS Capital Projects 477,645 500,667 23,022 4.8%
Total City Levy 16,902,412 17,960,145 1,057,733 6.3%
Assessed Value** 4,345,276,800 4,577,479,100 232,202,300 5.3%
* 2026 Adjusted to to match 2027 treatment as direct Debt Service Fund Levy revenue
** 2026 Assessed value is preliminary until Manufacturing values are equated
55
2
Motion to set the City of Oconomowoc 2026 property tax levy for the 2027 budget at $17,960,145.
56
1
MEMORANDUM
FINANCE DEPARTMENT
Date: November 3, 2026
To: Mayor and Common Council
From: John Schuh, Utility Accounting Manager
Steve Hatton, Finance Director
Re: Proposed 2027 Sanitary Sewer Rates
RELATES TO THE STRATEGIC PLAN
Strategic Goal-N/A
BACKGROUND
A thorough cost of service study has been conducted to ensure that the Wastewater Utility is recovering
adequate revenues to meet its financial needs. Service rates based on the study have been developed
so that all customers pay a fair and proportional share of all operating and capital costs. See the attached
pages showing the current and proposed 2027 service rates. Wastewater treatment rates are not
regulated by the Public Service Commission and are typically adjusted annually.
ADDITIONAL ANALYSIS
The Committee of the Whole reviewed on October 20, 2026, and recommended council approval.
FINANCIAL IMPACT
The study calculated a recommended net increase of 3.9% for residential customers. An average
customer’s monthly bill would increase by $1.30, from $33.69 to $34.99. This increase is lower than the
prior three year’s annual adjustments. City commercial customer rates would increase on average 1.0%
depending on volume and concentration of waste. The average net increase is lower for commercial
customers because the rate study determined the price adjustment should only be made to the fixed
monthly charge and not the variable per gallon rate. The increase is recommended to cover annual
operating expenses and provide a positive rate of return that continues funding current and future capital
projects necessary to maintain the integrity of our collection system, pumping stations and the treatment
facility.
Overall combined charges for the extraterritorial customers will also increase as a result of this rate review.
Charges to this customer group consist of annual license fees based on the number of residential
equivalent connections (RECs), and volumetric charges based on metered flow from each sanitary district.
The license fees are municipal (non-utility) revenue that increase annually by 4.0% per year under the
terms of the sewer service agreements. Volumetric charges are impacted by changes in operating and
maintenance expenses, annual flows and capital costs. The volumetric rates vary by district and would
increase 0.1% to 2.7%.
57
2
Customers outside the City limits, but not part of a wholesale metered sanitary district, are labeled “Outside
Contract”. The fixed and variable rates for outside contract customers are based on an engineering cost
of service model that is part of the agreements for sanitary sewer service. In 2027, the outside contract
fixed charge is lower than the City rate, however, the outside contract volume rate is higher. The lower
fixed cost is the result of the agreement that limits the amount of capital cost we can apply to the rates. In
addition to the fixed and volume charges, all non-city wastewater customers pay an annual “License
Fee”. For 2027 these range from $175.43 to $377.79.
The volume rate for the Village of Lac La Belle #1, Village of Lac La Belle #2 and Town of Ixonia #2 around
the western edge of Lac La Belle is lower than the volume rate for City customers. The rates for the
sanitary districts vary based on the level of service provided by our wastewater utility. Those three districts
own and provide maintenance to their local wastewater collection system. In addition, they have ownership
of a force main that brings their wastewater flow into the City. Therefore, the only service provided to those
districts is for treatment at the wastewater treatment facility. This creates the lower per gallon rate
charged. As noted above, these districts are also charged the annual license fee based on the number of
residential equivalent connections (RECs) in their district.
RECOMMENDATION
Recommend approval of proposed 2027 sanitary sewer rates.
SUGGESTED MOTION
Motion to approve the proposed 2027 sanitary sewer rate schedule.
EXHIBIT
The chart below shows the average wastewater monthly bill at our current and proposed rates compared
to a peer group of neighboring communities.
58
RESOLUTION NO. 26-R3413
RESOLUTION FOR WASTEWATER TREATMENT RATE ADJUSTMENT
WHEREAS, §13.50 of the Municipal Code of the City of Oconomowoc sets forth the
various sewer service charges and fees and provides in §13.50(6)(d) that the Common Council
shall establish the charges and fees by resolution; and
WHEREAS, §13.50 provides that there shall be an annual review of the user charge
system, which shall be computed by the Finance Director and presented to the Common
Council in time to provide for implementation of new charges for the following year; and
WHEREAS, the Finance Director has computed all rates, charges and fees for 2027 and
submitted a recommendation to the Committee of the Whole on October 20, 2026; and
WHEREAS, the Committee of the Whole reviewed and recommend approval of the 2027
sewer user rates, charges and fees for all wastewater treatment plant users, including
extraterritorial users, and the proposed septage disposal charges and fees.
NOW THEREFORE, BE IT HEREBY RESOLVED that the attached schedule of sewer
rates, charges and fees, including septage disposal charges, are approved and established as
the 2027 sewer rates, which rates shall remain in effect until further amendment by Common
Council resolution.
BE IT FURTHER RESOLVED that all other rates, charges and fees, including the sewer
availability charge, shall remain in effect unless amended by ordinance or resolution of the
Common Council.
BE IT FURTHER RESOLVED that this resolution and the rates, charges and fees set forth
on the attached schedule shall become effective January 1, 2027.
DATED: November 3, 2026 CITY OCONOMOWOC
By: _________________________
Matt Rosek, Mayor
ATTEST:
________________________
Gina Kozlik, Clerk
59
City of Oconomowoc
2027 Wastewater Rate Forecast-Adjusted
Current and Proposed Rates
Proposed
Retail Rates (Individually Metered Customers) Class Unit of Measure 2026 Rates 2027 Rates
City of Oconomowoc
Domestic Strength Volume A per 1,000 gallons 7.50 $ 7.50 $
Above Domestic Strength Volume B per 1,000 gallons 8.27 $ 8.27 $
High Sgrength Volume C per 1,000 gallons 7.50 $ 7.50 $
Fixed Customer Charge n/a per customer, per month 8.50 $ 9.80 $
Outside Contract Retail
Domestic Strength Volume A per 1,000 gallons 8.21 $ 8.21 $
Above Domestic Strength Volume B per 1,000 gallons 8.30 $ 8.30 $
Fixed Customer Charge n/a per customer, per month 3.91 $ 5.29 $
Proposed
Retail High-Strength Surcharges Class Unit of Measure 2026 Rates 2027 Rates
Biochemical Oxygen Demand (BOD) C pounds over 250 mg/L 0.58 $ 0.55 $
Total Suspended Solids (TSS) C pounds over 270 mg/L 0.39 $ 0.36 $
Phosphorus C pounds over 7 mg/L 14.05 $ 13.60 $
Proposed
Wholesale Contract Rates (Metered By District) Class Unit of Measure 2026 Rates 2027 Rates
V. of Lac LaBelle: #3 Blackhawk
Volume per 1,000 gallons 8.21 $ 8.22 $
Town of Ixonia #2
Volume per 1,000 gallons 6.27 $ 6.29 $
V. of Lac LaBelle: #2 Mary Lane
Volume per 1,000 gallons 6.27 $ 6.29 $
V. of Lac LaBelle: #1 Lac LaBelle
Volume per 1,000 gallons 6.27 $ 6.29 $
V. of Lac LaBelle: #4 Okauchee
Volume per 1,000 gallons 8.82 $ 9.06 $
V. of Oconomowoc Lake
Volume per 1,000 gallons 8.82 $ 9.06 $
V. of Summit: Silver Lake
Volume per 1,000 gallons 8.82 $ 9.06 $
Y:\Financial Statements\2026\Month End\2026-09 Utility Financial Stmts, Rates 27a1 10/7/2026, 8:31 AM
60
City of Oconomowoc
2027 Wastewater Rate Forecast-Adjusted
Average Residential Customer Impact
Average Residential
Customer Rate Impact
2027
Volume
2026
Rates
% of
Total
2027
Rates
% of
Total
$
Change
%
Change
Average Annual Usage 40,300
# of Months 12
Average Monthly Usage 3,358
Thousand Gallons 3.36 3.36 3.36
Volume Rate 7.50 7.50 - 0.0%
Volume Charge 25.19 75% 25.19 72% - 0.0%
Fixed Monthly Charge 8.50 25% 9.80 28% 1.30 15.3%
Total Charges 33.69 100% 34.99 100% 1.30 3.9%
Average Residential
Customer Rate Impact
2027
Volume
2026
Rates
% of
Total
2027
Rates
% of
Total
$
Change
%
Change
Average Annual Usage 40,300
Thousand Gallons 40.30 40.30 40.30
Volume Rate 7.50 7.50
Volume Charge 302.25 75% 302.25 72% - 0.0%
Fixed Monthly Charge 8.50 9.80
# of Months 12 12
Fixed Charge 102.00 25% 117.60 28% 15.60 15.3%
Total Charges 404.25 100% 419.85 72% 15.60 3.9%
Note, prior year budget average customer annual estimated consumption gallons was: 39,900
This represents a change in volume of: 400
1.0%
per Monthper Year
Y:\Financial Statements\2026\Month End\2026-09 Utility Financial Stmts, Avg Cust 27j1 10/7/2026, 8:34 AM
61
City of Oconomowoc
2027 Wastewater Rate Forecast-Adjusted
Miscellaneous Fees
2026 2027
Unit of Current Proposed
Description Measure Fee Fee
Application and Registration Fees
Renewal Application per firm 243.00$ 252.00$
Truck Registration per truck 21.00$ 22.00$
Initial Application per firm 353.00$ 367.00$
Analysis Fees
Biochemical Oxygen Demand (BOD) per test 40.80$ 42.40$
Total Suspended Solids (TSS) per test 17.50$ 18.20$
Phosphorus per test 20.40$ 21.20$
Oil and Grease per test 40.80$ 42.40$
pH per test 5.30$ 5.50$
Rates may be set for a particular originator based on sampling averages.
BOD TSS P
Septic and Holding Tanks Assumed Strength (mg / L) (mg / L) (mg / L)
Holding Tank 350 500 18.2
Septic Tank 5,000 11,000 23.9
High Strength Rate per Pound 0.55$ 0.39$ 13.60$
Unit of Current Proposed
Description Measure Fee Fee
Septic and Holding Tank Fees
Holding Tank per 1,000 gal 10.20$ 10.20$
Septic Tank per 1,000 gal 67.30$ 67.30$
Other Fees
Recreational Vehicle per load 5.00$ 5.00$
Administrative Charge per load 29.00$ 30.00$
Special Waste Review Fee (prepayment required) per review 103.00$ 107.00$
Misc Debris per load 279.00$ 290.00$
Y:\Financial Statements\2026\Month End\2026-09 Utility Financial Stmts, Misc Fees 27h3 10/7/2026, 8:41 AM
62
City of Oconomowoc
2027 Wastewater Rate Forecast-Original
License Fees for Contract Communities
Rate Rate
Sanitary District 2026 2027
V. of Lac LaBelle: #1 Lac LaBelle 168.68$ 175.43$
V. of Lac LaBelle: #2 Mary Lane 168.68$ 175.43$
V. of Lac LaBelle: #3 Blackhawk 181.64$ 188.91$
V. of Lac LaBelle: #4 Okauchee 181.64$ 188.91$
Town of Ixonia #2 168.68$ 175.43$
Village of Oconomowoc Lake 181.64$ 188.91$
Village of Summit - Residential 181.64$ 188.91$
Village of Summit - Non-Residential 363.26$ 377.79$
Silver Lake - Residential 181.64$ 188.91$
Silver Lake - Non-Residential 363.26$ 377.79$
Note - Fee increases 4.0% annually per contracts.
Note - License fees are revenue for the municipal general fund, not the wastewater utility.
Y:\Financial Statements\2026\Month End\2026-09 Utility Financial Stmts, Lic Fees 27i 10/7/2026, 8:48 AM
63
1
MEMORANDUM
FINANCE DEPARTMENT
Date: November 3, 2026
To: Mayor and Common Council
From: John Schuh, Utility Accounting Manager
Steve Hatton, Finance Director
RE: Consider/act on Approval of the 2027 Utility Budgets for Wastewater, Water, Electric
RELATES TO THE STRATEGIC PLAN
Strategic Goal-N/A
BACKGROUND
The details of the 2027 Utility Budgets were made available on October 21 for your review. The budget
was reviewed at a joint Utility Committee and Committee-of-the-Whole meeting on October 20, 2026,
and recommended for approval. This memo is intended to give you an overview of the budget and
budgeting process.
ADDITIONAL ANALYSIS
Wastewater Budget Overview
Unlike the PSC regulated water & electric utilities, wastewater rates are determined by the City Council
and typically adjusted annually. As part of the annual budget process, a detailed rate study model is
updated for the planned expenses. The study provides guidance on how to structure rates for both our
metered city customers and the outlying adjacent sanitary districts. The model also reflects anticipated
customer growth and changes in volume flow. For city customers, the study recommended an
adjustment only to the fixed monthly charge and not the variable per gallon rate. For an average
residential customer would have a net increase of 3.9% or $1.30/month. Sanitary district rates are
adjusted by their agreements and the rate model results, with increases varying between 0.1% and
2.7%.
Overall operating expenses are projected to increase 2.7% ($146,047). Because the Wastewater Utility
is very capital intensive, depreciation is one of the largest components, representing 29% of total
operating expenses.
The Wastewater capital budget continues to fund sewer main replacements and reinforcements in
conjunction with street repair projects. The capital budget of $1.05M is lower than most prior years. This
is partially due to the utility continuing to work complete studies for a future years’ major treatment plant
facility upgrade and capacity increase.
64
2
The Wastewater Utility is budgeted to produce an operating income of $439,550 and a rate of return of
1.98%. Actual operating expenses have historically been less than budgeted amounts. In addition, the
utility currently has adequate cash reserves as it prepares for future capital projects.
Water Budget Overview
The Water Utility’s current PSC approved rates were implemented in October 2025. The PSC calculated
those rates based on initial cost estimates for the Well #8 project that were below the subsequently
approved construction bids. The 2027 budget does not include additional revenue from another rate
increase. After the full year 2026 financial results and reporting are completed, we anticipate starting a
rate adjustment application with the PSC for an increase that would likely become effective in early 2028.
Operating revenue is projected to increase 5.1% ($319,231) due to the updated volume and customer
growth projections.
Overall operating expenses are projected to increase 4.7% ($208,273). The largest increases are from
operating expenses of the new Well #8 and related iron filtration processes.
The capital project budget includes about $2.3M of new projects. This includes $950,000 for water main
replacements, which is the lowest in 10 years as the utility focuses on investing in infrastructure at a
sustainable level while moderating its reliance on debt financing.
The Water Utility is projected to produce an operating income of $1,944,203 and a rate of return of
5.48%.
Electric Budget Overview
Operating revenue is projected to increase 4.0% ($1,201,423). Most of this is related to the anticipated
change in the cost of purchased power, increasing 5.0% ($1,019,337). WPPI provides our initial
guidance in forecasting future sales and costs of purchased power. Changes in the cost of purchased
power are recovered through monthly adjustments to the Purchase Cost Adjustment Charge (PCAC)
rate, which minimizes the financial impact on our local utility operations.
The budget does not include a PSC base rate increase for 2027. The current electric rates were
implemented in August 2023. Due to the long approval process, next year we may evaluate the timing of
a rate change application, which would likely be subsequent to the next water rate adjustment.
The cost of purchased power from WPPI, as noted above, represents 74% of total operating expenses
for the Electric Utility. Excluding that, other operating expenses are projected to decrease -0.4% (-
$28,040), due to lower depreciation from project timing adjustments. The largest expense increases are
due to wages & benefits.
The capital project budget includes $1.2M of distribution system upgrade projects. This represents a
continued effort to replace problematic cable, implement distribution voltage improvements, and upgrade
industrial services. The capital budget also includes an underground cable bore rig replacement, the
purchase of transformers and replacement small excavator.
Overall, the Electric Utility is projected to produce $2,034,115 in operating income with a rate of return of
4.67%.
65
3
FINANCIAL IMPACT
Our customers will continue to benefit from competitive utility rates compared to other communities. The
2027 budget aims to balance service reliability, regulatory compliance, and long-term asset sustainability
without imposing unnecessary financial burdens on our customers.
The City’s utilities issue about 156,000 invoices per year using data from almost 20,000 meters and
maintain about 600 miles of infrastructure. As the City grows, the demand placed on these essential
services increases, making it imperative to strategically manage resources and maintain our high
standards of service delivery.
RECOMMENDATION
Recommend approval of proposed 2027 Utility Budgets.
SUGGESTED MOTION
Motion to approve the 2027 Utility Budgets as presented.
66
1
MEMORANDUM
MAYOR
Date: November 3, 2026
To: Common Council
From: Matt Rosek, Mayor
Re: Appointments to Council Committees- Community Development Authority Vacancy
RELATES TO THE STRATEGIC PLAN
Strategic Goal – N/A
BACKGROUND
A Community Development Authority Commissioner vacancy was created with the resignation of April
Welch earlier this fall. The unexpired term can be filled by Mayoral appointment with confirmation by the
Common Council. I ask for your support in the appointment of Lou Kowieski to fill the vacant Council
member seat.
SUGGESTED MOTION
Motion to approve the appointment as submitted.
67
2-Yr Terms 3-Yr Terms
Jason Puestow (5/2026) 4/30/28 4 Scott Carter (10/2022) 4/30/27
19 Chairman: Jeremy Flint (4/2007) 4/30/28 9 Jeff Roemer (2/2017) 4/30/28
2 Ben Otten (4/2024) 4/30/27
Jared Matteson (5/2026) 4/30/28 4 Susan Marshall (12\2022) 4/30/28
11 Anne Krogstad (10/2015) 4/30/27 7 Mike Miller (5/2019) 4/30/27
Hearing Date/Time TBD 5-Yr Terms 3-Yr Terms
1 Andy Moroni (4/2025) 4/30/30 19 Bruce White (12/2007) 4/30/27
10 Leslie Kleba (4/2016) 4/30/28 16 Scott Antonneau (5/2010) 4/30/27
21 Jimi Hall (7/2005) 4/30/29 Aaron Kloth (5/2026) 4/30/29
6 Bonnie Lewis-Tschannen (10/2020) 4/30/28 Ald. April Welch 4/30/29
4 Burdus Galbraith (6/2022) 4/30/29 5 Chad Brown (1/2021) 4/30/29
2 Alt. Nicholas Noggle (4/2024) 4/30/29 21 Jimi Hall (7/2005) 4/30/28
Ald. Rusty McConnell 4/30/27
Meets as needed - TBD 3-Yr Terms 2 Julie Nankee (10/2024) 4/30/28
3 Laurie Muffler (4/2023) 4/30/29
Chairman: Ald. Zach Frankowski 4/30/27 3-Yr Terms
1 Kathryn Brisk (5/2025) 4/30/29 Chairman: Matt Rosek Mayor
1 Burdus Galbraith (4/2025) 4/30/27 Sawyer Kowieski (5/2026) 4/30/29
4 Mark Knight (12/2022) 4/30/27 9 Dean Frederick (4/2017) 4/30/28
Skylar Suttner (5/2026) 4/30/29 Matthew King (7/2026) 4/30/27
5 Sara Ninmann (4/2021) 4/30/27 David Byzeck (5/2026) 4/30/29
2 Carl Wickman (4/2024) 4/30/27
3-Yr Terms Ald. Kevin Ellis 4/30/27
Ald. Lou Kowieski 4/30/27
4 Scott Carter (4/2022) 4/30/28 5-Yr Terms
Joseph Chrnelich (5/2026) 4/30/29 5 Danny Day, Jr (2/2021) 4/30/27
2 Nicholas Noggle (4/2024) 4/30/27 1 Alex Hansen (4/2025) 4/30/30
3 Trevor Stiles (11/2023) 4/30/29 7 Chair: Mike Miller (5/2019) 4/30/29
3 Daniel Rogers (11/2023) 4/30/27 Michael Weix (10/2026) 4/30/31
Ald. Karen Spiegelberg 4/30/27 3 Louise Sausen (11/2023) 4/30/28
Ald. Jennifer Aultman Kloth 4/30/27
4-Yr Terms
Chairman: Matt Rosek 4/30/27 3-Yr Terms
Ald. Karen Spiegelberg 4/30/27 9 Chairman: Ken Brotheridge (10/2017) 4/30/26
Laurie Muffler (5/2026) 4/30/30 13 Kyle Driscoll (10/2013) 4/30/29
8 Mary Blaska (9/2018) 4/30/29 Kevin Murray (5/2026) 4/30/29
8 Dean Frederick (9/2018) 4/30/30 5 Danny Day, Jr. (4/2021) 4/30/27
5 Carl Wickman (2/2021) 4/30/27
3-Yr Terms 3 1st Alternate - Ben Otten (4/2023) 4/30/29
Lisa Remm (5/2026) 4/30/29 4 2nd Alternate-Burdus Galbraith (4/2022) 4/30/28
5 Kerry Hansen (7/2021) 4/30/28
Roland Johnson (5/2026) 4/30/29 Date / Time TBD No Terms
Kasey Metz (5/2026) 4/30/29 City Mayor Matt Rosek
7 Benjamin Nankee (5/2019) 4/30/28 City Citizen Member Dean Frederick
Ald. Jennifer Aultman Kloth 4/30/27 Waukesha County Member Andrew Thelke
Michele Koper (12/2025) School District Appointee 4/28 WCTC Member Jane Kittle
John Suttner (5/2026) Waukesha County Appt 7/1/29 OASD Member Beth Sheridan
3 Melissa Wood (7/2023) Waukesha County Appt 7/1/29
1 Melissa Howe (6/2025) Jefferson County Appointee 4/28
Zoning Board of Appeals - Meets as Needed
Joint Review Board - Meets as Needed
Elderly Housing Authority (EHA) - Meets as Needed
Library Board - 2nd Thursday each Month @6 PM
Community Development Authority (CDA) - Meets as Needed
COMMITTEES / BOARDS / COMMISSIONS
Police Commission - Meets as Needed @ 5 PM
Architectural Commission - 1st Wednesday each month @ 4:30 PM Years
Served
Years
Served
Plan Commission - 1st Wednesday each month @6 PM
Board of Review - Meets Annually (Initial Mtg in April)
Bureau of Economic Development & Tourism Commission
Western Lakes Fire District- Fire Board Members
Park & Recreation Board - 2nd Monday each month @6:30 PM
Western Lakes Fire District - Fire Commission Members
68