PLAN COMMISSION MEETING AGENDA
Friday, October 30, 2026 -- 9:00 A.M.
Sister Bay-Liberty Grove Fire Station – 2258 Mill Rd., Sister Bay, WI – Large Meeting Room
To access the meeting electronically, click:
https://zoom.us/j/4439901723?pwd=yAVpi40M1OIqgNufcVUE8XWCUSkKaH.1&omn=9706363858
Meeting ID: 443 990 1723 Passcode: 304078
To connect by phone: 1-301-715-8592 - Meeting ID 443 990 1723#
For additional meeting information visit: www.sisterbaywi.gov, click ‘Agendas and Minutes’ or watch the meeting video online.
AGENDA
1. Call to Order & Roll Call
2. Approve of Agenda
3. Approve Meeting Minutes:
a) September 22, 2026; Regular Meeting
4. Comments, Correspondence, and Concerns from the Public
5. Discussion/Action Items:
a) Proposed Land Division/Certified Survey Map (CSM) for Zaug Enterprises LTD to separate a 3-acre
parcel from an existing 16-acre parcel, Parcel#181005312832L
b) Proposed Spa- Dorr Hotel Holdings, LLC- 2335 Mill Rd
6. Zoning Permit Log
7. Matters to be Placed on a Future Agenda or Referred to a Committee, Official or Employee
8. Next Meeting
• Regular Monthly Meeting; November 10, 2026, at 5:30 P.M.; Large Meeting Room, Sister Bay-Liberty
Grove Fire Station
9. Adjournment
Pub
lic Notice
For q uestions regarding the above a genda items or to review the related files contact Sarah Bertges, Administrative Assistant,
at adminassist@sisterbaywi.gov. To submit letters in support or opposition of an agenda item that is not part of a public hearing, email
adminassist@sisterbaywi.gov by 4:00 pm the day before the meeting; letters regarding a public hearing must be received by 4:00 pm
the Thursday before the hearing. It is possible that members of, or quorum of, other governmental bodies may attend the meeting to
gather information; no action will be taken by any governmental body other than the body specifically referred to above. Upon
reasonable notice, a good faith effort will be made to accommodate the needs of disabled individuals through sign language interpreters
or other auxiliary aid or accommodation at no cost to the individual. Due to the difficulty in finding interpreters, requests should be made
as far in advance as possible, preferably a minimum of 48 hours. For additional information or to request this service, contact the Village
Administration Office at 920.854.4118 or in writing to: Village Administration Building, 2383 Maple Dr., PO Box 769, Sister Bay, WI 54234.
Copies of reports and other supporting documentation are typically available online and can also be viewed at the Village Administration
Office 8 am – 4 pm Monday through Thursday, except holidays.
The Village of Sister Bay is an Equal Opportunity Provider & Employer
1
VILLAGE OF SISTER BAY 1
PLAN COMMISSION MEETING MINUTES 2
TUESDAY , SEPTEMBER 22, 2026 3
UNAPPROVED 4
5
1. Call to Order & Roll Call 6
Chairperson Nate Bell called the Plan Commission meeting to order on Tuesday, September 22, 2026, 7
at 5:30 P.M., and roll call was taken. 8
9
Present: Commission members Nate Bell, Jerry Ahrens, Skip Heidler, and Brigid White. 10
11
Staff Member(s): Village Zoning Administrator Benjamin Andrews, Administrative Assistant Sarah 12
Bertges. 13
14
Others: Mary Pat Carlson, Mihir Sinhasan. VIA ZOOM: Jake Gazlay. 15
16
2. Approve of Agenda 17
Prior to approval, Bell moved to amend the agenda with two changes: item 3 (Approve Meeting 18
Minutes) was corrected to reference the July 28, 2026 regular meeting rather than the June 23 19
meeting, and item 5a (Development Agreement; Sister Bay General Store, LLC) was removed from 20
the agenda on the advice of counsel. 21
Motion to approve the agenda as amended was made by Heidler and second by Ahrens . The motion 22
carried- all ayes. 23
24
3. Approve Meeting Minutes 25
3a. July 28, 2026; Regular Meeting 26
Heidler presented several corrections to the draft minutes. 27
Motion to approve the July 28, 2026 meeting minutes as amended was made by Heidler and second 28
by Ahrens. The motion carried – all ayes 29
30
4. Comments, Correspondence, and Concerns from the Public 31
Bell noted that one email had been received from a member of the public the previous day and that 32
all commissioners had been provided a copy. No other comments or correspondence were received. 33
34
5. Discussion/Action Items 35
36
5a. Development Agreement; Sister Bay General Store, LLC; 10674 North Bay Shore Drive 37
This item was removed from the agenda prior to approval on the advice of counsel. 38
39
5b. Text Amendment Revisions Discussions 40
Andrews provided an overview of the procedural requirements for adopting any proposed zoning 41
code amendments. He outlined a two-scenario timeline: under Scenario 1, a public hearing could 42
follow this meeting with adoption in November; under Scenario 2, a public hearing held in 43
conjunction with the October 29 meeting would result in adoption in December. Sample notice 44
documents, a standard ordinance amendment format, and individual staff reports for each 45
amendment topic were included in the commission's packet. 46
The commission discussed scheduling concerns. Bell noted that the October 29 meeting falls on a 47
Green Bay Packers game day and expressed reluctance to hold a public hearing on that date out of 48
fairness to the public. The commission reached consensus that the October 29 meeting could proceed 49
as a regular plan commission meeting without a public hearing. The public hearing should be 50
2
September 22, 2026 Plan Commission Meeting- Unapproved
2
scheduled on November 10 in conjunction with a regular plan commission meeting — two weeks 1
ahead of the regular November schedule. 2
Andrews confirmed that holding a public hearing on November 10 would allow sufficient time for 3
the required Class 2 notice publication, even if some final details of the amendments were still being 4
refined at the October 29 meeting. The commission agreed to proceed on this schedule. 5
6
5.b.i. Automotive Body and Mechanical Repair7
Andrews summarized the changes made to the draft ordinance language since the previous meeting, 8
including moving automotive body and mechanical repair from a permitted use to a conditional use, 9
incorporating specific code references for noise, fumes and ventilation, and outdoor vehicle storage 10
screening. 11
Heidler raised several points for discussion and correction: 12
● A reference to code section 66.0403 was noted to contain a formatting error and should be13
corrected.14
● Lines 21–27 of page 55 were discussed regarding outdoor vehicle storage screening15
requirements for large trucks, semi-trailers, and large equipment. Heidler recommended16
adding a sub-bullet referencing the applicable code section (§66.0405(8)), with language17
indicating that businesses servicing larger vehicles may be required to provide taller or18
additional screening as determined by the Plan Commission, rather than mandating a19
specific fence height in all cases. White noted that an 8-foot solid fence would look unusual20
and that evergreen plantings could supplement screening for taller vehicles. The commission21
agreed with language along the lines of: "If large vehicles are serviced, greater screening22
compliance with §66.0405(8) may be required."23
● A scrivener’s error on line 32, where a comma appeared in place of a decimal point in a code24
reference, was identified for correction.25
The commission debated proposed subsection (f), which would have closed the business to the 26
public between certain hours. Heidler, Bell, and White all agreed this provision was unnecessary, as 27
operating noise is governed by existing ordinances applicable to all businesses, and towing drop-offs 28
during off-hours are an inherent characteristic of the trade that cannot realistically be regulated. The 29
commission acknowledged other sections of the code that include operational conditions for specific 30
uses (such as kennels), but agreed that those conditions address distinct circumstances. Consensus 31
was reached to strike subsection (f) from the draft ordinance entirely. 32
33
5.b.ii. Fee-In-Lieu of Parking34
Andrews presented a revised fee-in-lieu of parking formula developed using real assessed value data 35
for the B-3 district. The formula incorporates the following variables: assessed land value per square 36
foot (B), the standard parking space area (L, set at 350 square feet per space), construction cost per 37
space (Z), an amortization period of 20 years (A), and annual maintenance (M). Andrews indicated 38
the formula produces an annual fee of approximately $1,435 per parking space, which he noted was 39
not far off from prior static estimates. 40
Key discussion points included: 41
Square footage per space: Heidler questioned the use of 350 square feet, noting that a standard stall 42
is 9 by 20 feet (180 square feet). Andrews explained the 350-square-foot figure accounts for the 43
proportional share of drive aisles and common areas. The commission confirmed this is consistent 44
with industry guidance (300–350 square feet per space is the accepted standard for commercial lots) 45
and agreed the figure is defensible. 46
Annual maintenance as a variable: Heidler recommended that the annual maintenance value (M) 47
not be fixed in perpetuity but should be included in the five-year formula review, with CPI 48
adjustments applying between reviews. The commission agreed, and Andrews confirmed this would 49
be a straightforward change. 50
3
September 22, 2026 Plan Commission Meeting- Unapproved
3
Construction cost per space: White expressed concern that the $7,500 construction cost per space 1
may be inflated relative to surface lot construction, which she estimated is typically between $2,500 2
and $5,000. Bell indicated $7,500 was selected as a reasonable surface lot estimate inclusive of 3
grading, engineering, and site preparation. Andrews demonstrated that substituting $5,000 for 4
$7,500, all else equal, would reduce the annual fee by approximately $100 per space (to 5
approximately $1,340). The commission requested that a real-world cost figure — ideally from an 6
actual quote for a surface parking lot — be obtained and included in the October packet for further 7
consideration. 8
Exclusion of zero-value parcels: Heidler noted that several parcels in the B-3 district had acreage 9
recorded but no assessed value (municipally owned or exempt properties), and their acreage should 10
be removed from the assessed-value-per-square-foot calculation to avoid underrepresenting the 11
true market land value. Andrews agreed to remove those parcels and recalculate. 12
Inclusion of B-2 district: The commission reaffirmed its earlier consensus to extend the fee-in-lieu 13
program to both the B-2 and B-3 districts, rather than B-3 alone. Andrews confirmed the resolution 14
language and assessed value calculations would be revised accordingly. 15
Terminology — "developer" vs. "business": Heidler identified inconsistent use of "developer" and 16
"business" in the draft ordinance and resolution. The commission agreed to replace all references to 17
"developer" with "business" for consistency and clarity regarding who bears responsibility for the 18
fee. 19
Compound interest: Andrews noted an assumption of compound interest was built into the 20-year 20
amortization schedule but was not explicitly stated in the draft language. The commission agreed 21
that language should be added to clarify that the CPI adjustment compounds annually. 22
Resolution language: Additional minor corrections were noted, including updating references from 23
B-3 to B-2 and B-3, removing zero-assessed-value acreage, and replacing the word "breakdown" with24
"calculation" in the supporting documentation reference. 25
The commission reached consensus that Andrews would bring a revised formula and resolution to the 26
October 29 meeting, incorporating all agreed-upon adjustments. 27
28
5.b.iii. Accessory Dwelling Units (ADUs)29
Andrews summarized revisions to the draft ADU ordinance made since the prior meeting, including: 30
alignment of R-4 language with corrected meeting minutes; removal of the 800-square-foot 31
maximum, leaving building code as the effective limit; allowance for both attached and detached 32
ADUs; updated parking requirements; maintained height limitations; and architectural compatibility 33
requirements. 34
R-4 District: The commission discussed whether ADUs should be addressed at all in the R-4 district.35
Bell argued that because R-4 is entirely village-owned, the village has absolute control over 36
development in that district as a property owner, and codifying zoning restrictions on it is premature 37
and potentially limiting. He suggested striking R-4 from both the permitting provision (item 4) and 38
the prohibition provision (item 5), and making R-4 zoning a separate future agenda item. White 39
acknowledged the point while noting a preference that the village not hold itself to a different 40
standard than it requires of private property owners. The commission reached consensus to remove 41
R-4 from both items 4 and 5 of the ADU draft and to place a broader R-4 zoning review on a future42
agenda. 43
Owner-Occupancy and Short-Term Rental Risk: Heidler raised substantive concerns regarding the 44
interaction between ADUs and the state's short-term rental (STR) preemption law. He noted that 45
under current state law, municipalities cannot restrict an STR to fewer than 180 days per year, 46
cannot mandate when those 180 days occur, and cannot require that the owner be physically 47
present. This means that a property owner could potentially construct an ADU and short-term-rent 48
both the primary dwelling and the ADU for up to 180 days each — simultaneously operating two STR 49
units on a single residential parcel — without any owner-occupancy restriction being enforceable. 50
4
September 22, 2026 Plan Commission Meeting- Unapproved
4
White confirmed that state legislative attempts to restrict ADUs from being used as STRs failed, and 1
Andrews noted that the most restrictive owner-occupancy condition legally permissible is the 6-2
month threshold, without the ability to dictate when that period falls. 3
Bell acknowledged the concern but argued that doing nothing also has costs — including the ongoing 4
loss of housing options — and that the consequences of allowing ADUs may be less severe than 5
assumed, particularly given that STR numbers have been declining. He advocated for trying the 6
approach and adjusting if needed. 7
The commission debated the merits of restricting ADUs to attached units only. Heidler expressed a 8
preference for attached ADUs as a way to reduce the likelihood of short-term rental conversion, 9
since property owners are generally less inclined to rent a unit connected to their own living space. 10
White noted, however, that residents have historically been denied the ability to finish space above 11
garages for family use, suggesting there is unmet demand for attached accessory space as well. 12
Parking: Bell proposed limiting the additional parking allowance to no more than one space, rather 13
than "at least one space" as currently drafted. This would help limit the scale of short-term rental 14
operations on residential lots by constraining the number of vehicles that can be accommodated. 15
White noted that some STR tenants already park on the street regardless of off-street availability. 16
The commission reached consensus to change the parking provision to "up to one additional off-17
street parking space," and to bring the full draft to public hearing with that language included. 18
The commission agreed that public hearing on ADUs is warranted and that genuine weight should be 19
given to public testimony. White emphasized the importance of broadly publicizing the hearing, and 20
the commission discussed using email blasts to all village subscribers, supplemental press releases, 21
and any available media contacts to maximize public awareness beyond the statutory Class 2 notice 22
requirement. 23
24
5.b.iv. Development Agreement25
Andrews presented a draft ordinance amendment changing the period for execution of 26
development agreements from six months to 45 days. This change was discussed at a prior meeting 27
as a means of preventing developers from using an extended execution window as a negotiation 28
tool. A typographical error ("billboard" misspelled with an extra "o") was identified for correction. 29
The commission confirmed consensus on the 45-day amendment with no further substantive 30
discussion. 31
32
6. Zoning Permit Log33
Andrews noted that the Door Hotel is anticipated to submit a complete standard zoning permit 34
application for the October 29 meeting, and that staff is working with the applicant to obtain all 35
required materials. 36
White raised a concern regarding permit application 26-019 (a sign permit), which was submitted in 37
March but not approved until June — a timeline she characterized as unusually long based on 38
feedback she received from the community. Andrews acknowledged the application involved 39
additional back-and-forth review and some implementation issues following approval, and offered 40
to provide a written summary of the correspondence if requested. Heidler noted the applicant's 41
proposed sign had initially exceeded code requirements for height, which contributed to the 42
extended review period. 43
44
7. Matters to be Placed on a Future Agenda or Referred to a Committee, Official or Employee45
7a. Site Plan and Architectural Review; Friends of the Ice Rink/Sister Bay Sports Complex; 2155 46
Autumn Court 47
Andrews confirmed the ice rink site plan and architectural review is anticipated to come before the 48
commission at a future meeting once a revised site plan is available. 49
The commission also identified the following additional future agenda items: 50
5
September 22, 2026 Plan Commission Meeting- Unapproved
5
● Certified Survey Map (CSM) — Warren's Ogg: Andrews confirmed this is targeted for the1
October 29 meeting.2
● Flagpole Location: Bell noted that discussions at the board level are ongoing and that3
complications have arisen regarding the proposed location. The item will be brought back when 4
further direction is available. 5
● R-4 Zoning Review: To be scheduled as a standalone discussion item.6
● Short-Term Rental Ordinance Review: Andrews noted a referral from personnel regarding7
potential process improvements to the STR notification and complaint system. White 8
summarized the concern as involving the efficiency of the current neighbor-notification letter 9
process and the appropriate channel for filing complaints. Bell noted that the licensing and 10
complaint process is primarily a village board matter, not a zoning matter, and recommended 11
the STR review be directed first to the board. Andrews agreed to identify which components 12
appropriately originate at the planning commission level and bring those forward. The 13
commission noted that any changes for the following permit year would need to be addressed 14
no later than early 2027. 15
16
8. Next Meeting17
8a. Regular Monthly Meeting; Thursday, October 29, 2026, at 5:30 P.M.; Large Meeting Room, 18
Sister Bay-Liberty Grove Fire Station 19
The commission confirmed the next regular meeting will be held on Thursday, October 29, 2026, at 20
5:30 P.M. in the Large Meeting Room at the Sister Bay-Liberty Grove Fire Station. 21
The commission also confirmed that the November public hearing will be scheduled in conjunction 22
with a regular Plan meeting on Tuesday, November 10, 2026, at 5:30 P.M. 23
24
9. Adjournment25
Motion to adjourn at 7:06 PM. 26
Motion by Heidler second by Ahrens. Motion carried -all ayes. 27
28
Respectfully submitted by Sarah Bertges, Administrative Assistant 29
6
COMMENTS, CORRESPONDENCE,
AND CONCERNS FROM THE PUBLIC
Date: October 30, 2026
To: Plan Commission
Re: October 2026
Written Correspondence is included in the packet below for the month.
7
8
9
10
P
age 1
STAFF REPORT
Date: October 30, 2026
To: Plan Commission
Re: Zaug Land Division
Proposed Land Division/Certified Survey Map (CSM) for Zaug Enterprises LTD to separate a 3-acre
parcel from an existing 16-acre parcel, Parcel#181005312832L
11
12
13
14
15
P
age 1
STAFF REPORT
Date: October 30, 2026
To: Plan Commission
Re: Spa- Dorr Hotel Holdings, LLC
a) Proposed Spa- Dorr Hotel Holdings, LLC- 2335 Mill Rd
16
17
Proposed SPA
Proposed Location:
Address: 2335 Mill Rd, Sister Bay, WI
Ownership: The Dorr Hotel Holdings, LLC
Zoning: B-3 Downtown Business District
Amended October 29, 2026
18
Location of proposed spa in Sister Bay, WI
19
20
21
Code review on parking shows:
• 1 space loading requirement, available on Mill Rd
• 1 space per 300sqft; 2,500sqft=8 spaces
• 1 space per 4 patrons, max 20 patrons= 5 spaces
• 3 space B-3 district credit
Adjustments, shared parking with The Dorr hotel, spa primarily
used by Hotel patrons
22
Plan Committee preliminary review- March 31, 2026
2335 Mill Road, Sister Bay Amended October 29, 2026
The proposed use is a spa that would accommodate up to 20 patrons. Change to 40 patrons at max capacity, we
do not expect to be at max very often if at all.
The property is in the B-3 Downtown Business District with a spa as a permitted use.
Code review on parking shows:
• 1 space loading requirement, available on Mill Rd
• 1 space per 300sqft; 2,500sqft=8 spaces
• 1 space per 4 patrons, max 20 40 patrons= 5 spaces 10 spaces
• 3 space B-3 district credit-
• 7 spaces shared parking
Asking the Plan Committee to review the availability of shared parking with The Dorr hotel
in accordance with section 66.0404(1) (b) to meet the parking requirements. Parking is
available within 400 feet of the lot to satisfy the parking demand.
Thank you in advance for this preliminary review.
23
24
25
26
Lighting fixtures for outside of building
2700 Lumens to be used
27
PRINT DATE:
2026 © E30 FACADES, INC.
TEMPLATE VERSION: MODEL: TITLE BLOCK VERSION:
SHEET NUMBER:
PRELIM DATE 10/02/2026
SHEET TITLE:
KEY PLAN
SHEET INFORMATION
PROJECT NUMBER
2335 Mill Rd, Sister Bay, WI 54234
SUBMITTAL DATES
SPECIALTY ENGINEER
DRAWN BY
DÖRR SPA PROJECT
MASSING STUDY FOR:
513 W.COLLEGE AVE,
SUITE 330
APPLETON, WI 54911
(920) 903-3160
PROJECT
INFORMATION
DAN MEISSNER
2329 Mill Rd
Sister Bay, WI 54234
PROFESSIONAL SEAL
AJ
10/07/2026 12:12:21 PM C:\Users\Aldin\Documents\Dan_Meissner_Dorr_Project_light_Aldin.JusicHWUWF.rvt
G100
COVER SHEET
260032601
260000000
DÖRR SPA PROJECT
2335 MILL RD SISTER BAY, WISCONSIN
PROJECT LOCATION MAP
SHEET LIST
SHEET # SHEET NAME
100% SD
100% DD
ISSUE FOR PERMIT
100% CD
G100 COVER SHEET
A102 LIGHTING PLAN - EXTERIOR
A110 FOUNDATION PLAN
A120 FLOOR PLAN
A130 EXTERIOR ELEVATIONS
R - FOR REFERENCE ONLY
• - SHEET INCLUDED FOR SUBMISSION
VICINITY
SITE LOCATION
28
EXTERIOR LIGHTING
EXTERIOR LIGHTING
EXTERIOR LIGHTING
PRINT DATE:
2026 © E30 FACADES, INC.
TEMPLATE VERSION: MODEL: TITLE BLOCK VERSION:
SHEET NUMBER:
PRELIM DATE 10/05/2026
SHEET TITLE:
KEY PLAN
SHEET INFORMATION
PROJECT NUMBER
2329 Mill Rd, Sister Bay, WI 54234
SUBMITTAL DATES
SPECIALTY ENGINEER
DRAWN BY
DAN MEISSNER -
DORR PROJECT
MASSING STUDY FOR:
513 W.COLLEGE AVE,
SUITE 330
APPLETON, WI 54911
(920) 903-3160
PROJECT
INFORMATION
DAN MEISSNER
2329 Mill Rd
Sister Bay, WI 54234
PROFESSIONAL SEAL
AJ
10/07/2026 12:12:29 PM C:\Users\Aldin\Documents\Dan_Meissner_Dorr_Project_light_Aldin.JusicHWUWF.rvt
A102
LIGHTING PLAN - EXTERIOR
260032601
260000000
1/8" = 1'-0"1 LIGHTING PLAN - EXTERIOR
NOT
FOR
CONSTRU
CTI
ON
29
MILL
ROAD
5.5'
10'
12' - 5 7/8" 18' - 4 1/8" 8' - 10" 1' - 0" 9' - 0" 3' - 0"
52' - 8"
12' - 6"10' - 3 1/2"9"
4 5/8" 8"
8"
2' - 1 3/4"
8" 8" 8"
8" 4' - 11" 8" 12' - 6" 8"
6' - 4 7/8" 6' - 0" 39' - 4 1/8"
3' - 6 1/2" 6' - 0" 43' - 1 1/2"
-0' - 6"
-4' - 0"
-4' - 0" 0' - 0"
-4' - 0"
0' - 0"
-4' - 0"
2' - 0"
4' - 0"
-0' - 6"
-0' - 6"
6' - 0"
-0' - 6"
6' - 0"
8' - 6"
4' - 0"
8' - 0"
8' - 0"
4' - 0"
8' - 0"
-0' - 6"
-0' - 6"
-0' - 6"
4' - 0"
-4' - 0"
8' - 0"0' - 0"
-4' - 0"
0' - 0"
-4' - 0"
-0' - 6"
-4' - 0"
-0' - 6"
4' - 0"
4' - 0"
4' - 0" 4' - 0"
-4' - 0"
8' - 0"
4' - 0"
8' - 0"
PRINT DATE:
2026 © E30 FACADES, INC.
TEMPLATE VERSION: MODEL: TITLE BLOCK VERSION:
SHEET NUMBER:
PRELIM DATE 10/05/2026
SHEET TITLE:
KEY PLAN
SHEET INFORMATION
PROJECT NUMBER
2329 Mill Rd, Sister Bay, WI 54234
SUBMITTAL DATES
SPECIALTY ENGINEER
DRAWN BY
DAN MEISSNER -
DORR PROJECT
MASSING STUDY FOR:
513 W.COLLEGE AVE,
SUITE 330
APPLETON, WI 54911
(920) 903-3160
PROJECT
INFORMATION
DAN MEISSNER
2329 Mill Rd
Sister Bay, WI 54234
PROFESSIONAL SEAL
AJ
10/07/2026 12:12:29 PM C:\Users\Aldin\Documents\Dan_Meissner_Dorr_Project_light_Aldin.JusicHWUWF.rvt
A110
FOUNDATION PLAN
260032601
NOT
FOR
CONSTRU
CTI
ON
260000000
1/8" = 1'-0"1 FOUNDATION PLAN
30
GROUND LEVEL
0' - 0"
UPPER LEVEL
8' - 6"
24' - 0"
GROUND LEVEL
0' - 0"
UPPER LEVEL
8' - 6"
GROUND LEVEL
0' - 0"
UPPER LEVEL
8' - 6"
GROUND LEVEL
0' - 0"
UPPER LEVEL
8' - 6"
25' - 1 1/2"
24' - 0"
PRINT DATE:
2026 © E30 FACADES, INC.
TEMPLATE VERSION: MODEL: TITLE BLOCK VERSION:
SHEET NUMBER:
PRELIM DATE 08/25/2026
SHEET TITLE:
KEY PLAN
SHEET INFORMATION
PROJECT NUMBER
2329 Mill Rd, Sister Bay, WI 54234
SUBMITTAL DATES
SPECIALTY ENGINEER
DRAWN BY
DAN MEISSNER -
DORR PROJECT
MASSING STUDY FOR:
513 W.COLLEGE AVE,
SUITE 330
APPLETON, WI 54911
(920) 903-3160
PROJECT
INFORMATION
DAN MEISSNER
2329 Mill Rd
Sister Bay, WI 54234
PROFESSIONAL SEAL
AJ
10/07/2026 12:12:41 PM C:\Users\Aldin\Documents\Dan_Meissner_Dorr_Project_light_Aldin.JusicHWUWF.rvt
A130
EXTERIOR ELEVATIONS
260032601
260000000
3/16" = 1'-0"1 NORTH ELEVATION
3/16" = 1'-0"2 EAST ELEVATION
3/16" = 1'-0"3 SOUTH ELEVATION
3/16" = 1'-0"4 WEST ELEVATION
NOT
FOR
CONSTRU
CTI
ON
31
P
age 1
STAFF REPORT
Date: October 30, 2026
To: Plan Commission
Re: Zoning Permit Log
The most recently updated Zoning Permit Log was submitted to Plan Commission members on
10/29/2026 via email.
32