RecordWell Data

Village Board — Agenda packet

Village of Ephraim · Door County · Village Board · meeting of Nov 6, 2026 · Agenda packets

Open the original document More from Village of Ephraim

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

VILLAGE OF EPHRAIM BOARD MEETING AGENDA Friday, NOVEMBER 6 , 2026, 8:00 AM 10005 Norway Street- Village Admin Office VILLAGE OF EPHRAIM FOUNDED 1853 Please Note Meeting location change to Admin Building NOTE: SO LONG AS INTERNET SERVICE IS AVAILABLE, THIS MEETING WILL BE SIMULTANEOUSLY HELD VIA TELECONFERENCING. STAFF, COMMITTEE MEMBERS, AND THE PUBLIC ARE WELCOME TO PARTICIPATE IN THIS MANNER. TELECONFERENCING WILL BE AVAILABLE BY COMPUTER, PHONE, TABLET, OR DIAL-IN. CONNECTION INFORMATION BELOW: 1. Call to Order: 2. Quorum: 3. Changes in Agenda: 4. Visitors’ Comments: 5. Administration: a) Discussion and Consideration regarding Village Administration Office Project options 6. Adjournment: Please join my meeting from your computer, tablet or smartphone. https://meet.goto.com/974160445 You can also dial in using your phone. Access Code: 974-160-445 United States: +1 (408) 650-3123 *Deviation from the listed order may occur*** Please note, that upon reasonable notice, efforts will be made to accommodate the needs of disabled individuals through appropriate aids and services. For additional information please contact Andrea Collak, Clerk Village of Ephraim, PO Box 138, Ephraim, WI 54211 Date: 11/4/2026 Andrea Collak, Clerk X Village Administrative Office X Library X Post Office Kim Roberts, Deputy Clerk X Website: ephraim.wi.gov X Emailed to WDOR Radio/Peninsula Pulse Administration Building Project Overview & Options Carly, Ken & Brent 11/3/2026 Ephraim Administration Building Problem Solving Matrix Problem (box checked if option provides improvement over existing condition) Option 0 Option 1 Option 2 Environmental X X X Accessibility X X Work Operations X Public Interactions X Problem Summary: Environmental: To improve health and air quality, flat roof and leak correction, building insulation, HV AC. Accessibility: Improve accessibility for staff and public. Work Operations: To improve daily operations and workflow for staff. Public Interactions: To improve staff ability to serve public with less disruption to daily operations. Option 1: Environmental: Resolves issues. Accessibility: Provides enclosed ramp, ramp entrance point not optimal. Work Operations: No privacy improvements for front desk. Smaller offices. Low flexibility for future needs. Public Interactions: Confusing entry points for visitors because we are now maintaining two public access points. Less secure as ramp entrance is basically a blind back door to the office. Single unisex bathroom for public meetings. No lobby. Meeting room provides the minimum layout/space for voting. Option 2: Environmental: Resolves issues. Accessibility: Provides enclosed ramp and new primary entrance point. Stairs are also provided at new entrance. Work Operations: Provides improved privacy for front desk. Improves interaction/flow for staff activities. Better separation of space (meeting vs. staff) for improved privacy and less disruption. Expansion possibility for future staff needs (space for 2 cubicles). Increased flexible space for elections. More dedicated accessible short-term storage. Public Interactions: Provides dedicated transaction desk for all staff to use with public, allowing ability to serve public from the lobby entrance area in two locations. Easier to hear and serve the public entering the building when Kim is out of the office. Two bathrooms (Women’s and Men’s) with closer proximity for staff and public while still being private. Public bathroom on South side with exterior access thus not disrupting office operations. Improved election storage. Provides dedicated lobby. More secure with primary entrance point. Cost Estimates: Option 1: Remodel & Addition Total: 2,622 (Existing 2,172 sq. ft. & 450 sq. ft. New) Budget: $1,575,000 with $100,000 contingency Timeline: 6 months construction A comprehensive renovation of the existing 2,172 square foot facility to improve code compliance, and overall building performance. This option includes an internal ramp (rather than an external) in the small addition. Work would involve reconfiguration of interior spaces, upgrades to mechanical, electrical, and plumbing systems, and improvements to the building envelope as needed. Option 2.0: Remodel & Addition Total: 2,990 (Existing 2,172 sq. ft. & 818 sq. ft. New) Budget: $1,800,000 with $100,000 contingency Timeline: 6 months construction This option includes renovation of the existing 2,172 square foot facility combined with an 818 square foot addition to allow internal ramp and additional work space. Work includes integration of new and existing systems, interior reconfiguration, and upgrades to building systems and envelope. Chronology of Administration Building Improvements: All dates are 2026 VB meetings - February10: Approved Survey & Environmental/ Hazardous Material Inspection by Keller - April 14: Presented 5 Options Option 0 - Deferred Maintenance Option 1 - Minor Changes Option 2 - Small Addition Option 3 - Large Addition Option 4 - New Building on existing property All Options but 1 & 2 capable of holding future Village meetings All Options but 0 include a ramp for improved accessibility - May 12: Presented details of 5 Options, along with Pros/ Cons and Estimated Cost - June 9: Reviewed 5 Options Eliminated Option 3: Large addition Determined existing building would not be demolished regardless of option chosen - July 14: Engaged architect to develop options to VH for use in holding future Village meetings. Also discuss future A V needs for VH. - July 28: Reviewed options for VH remodeling and A V systems for future VH meetings. - August 11: Agreed no remodeling of VH Agreed future VB, PC & HPC meetings to be held in VH and all Committee meetings in remodeled Admin Building Decision to eliminate Option 4 Decision to focus on Options 1 and 2 BUILDING CODE ANALYSIS APPLICABLE CODES 2021 International Building Code (w/ WI Amendments) ASHRAE Standard 90.1-2019 2021 IEBC (Level # Alteration) OCCUPANCY --- Accessory Use ---- Incidental Use ---- High-Piled Combustible Storage YES/NO Hazardous Materials YES/NO Multiple Control Areas YES/NO HEIGHT & AREA Building Height: -'--" Maximum Allowed: -'--" Number of Stories: -- Maximum Allowed: -- Total Building Area: -,--- S.F. Maximum Allowed: -,--- S.F. Total Fire Area: -,--- S.F. Maximum Allowed: -,--- S.F. Mixed/Separated Occupancies Unlimited Area Building YES/NO CONSTRUCTION TYPE Construction Classification -B Fire Separation Distance -'--" FIRE PROTECTION SYSTEMS Assumed Sprinkler Type -- Fire Alarm System YES/NO MEANS OF EGRESS Occupant Load -- Panic Hardware YES/NO STRUCTURAL DESIGN Risk Category -- Design Loads Roof Live Load -- psf Walk-on IMP Ceiling Live Load -- psf Steel Framing Collateral Load -- psf Wood Truss Top Chord Dead Load -- psf Bottom Chord Load -- psf Mezzanine/Second Floor/Basement Live Load -- psf Point Load (Partition) -- psf Snow Load Criteria Ground Snow Load (Pg) -- psf Exposure Factor (Ce) -- Thermal Factor (Ct) -- Wind Loads Wind Load -- MPH Surface Roughness -- Exposure Category -- Earthquake Load Criteria Soil Site Class -- Ss -- S1 -- PLUMBING SYSTEMS Mens WC Required # Womens WC Required # Drinking Fountain Required # Other Source YES/NO Ambulatory Stall Required YES/NO MECHANICAL SYSTEMS NO SINGLE PIECE OF EQUIPMENT OVER 400,000 BTU NO BOILERS OVER 15 PSI AND 10 HORSEPOWER SITE INFORMATION SITE CONTENT Building Size -,--- S.F. -.--% Hard Surface -,--- S.F. -.--% Green Space -,--- S.F. -.--% Parcel Size (Approx.) -,--- S.F. -.-- Acres Parking Provided -- Stalls Area of Disturbance -,--- S.F. ZONING Property Zoning -- Setbacks FY -'--" SY -'--" RY -'--" Hard Surface Setback -'--" Coverage Limit --% Greenspace Requirement --% Parking Required -- Stalls Refuse Enclosure YES/NO RTU SCREENING YES/NO FLOOR AREAS SECOND FLOOR BUILDING & FIRE AREA SQUARE FOOTAGES FIRST FLOOR CANOPIES (COLUMN SUPPORTED) BASEMENT EXISTING NEW ------ S.F. SUB-TOTAL BUILDING AREA SUB-TOTALS MEZZANINES FIRE AREA TOTALS ------ S.F. ------ S.F. 2,172 S.F. 450 S.F. 46 S.F. ------ S.F. 1,698 S.F. ------ S.F. 3,916 S.F. ------ S.F. ------ S.F. ------ S.F. REMODEL AREA TOTALS ------ S.F. --% OF BUILDING AREA 3,916 S.F. 2,622 S.F. 1,698 S.F. 46 S.F. 4,366 S.F. 4,366 S.F. 450 S.F. 450 S.F. CHURCH ST NORWAY ST N EXISTING BUILDING IVERSON LN EXISTING BUILDING NEW SIDEWALK NEW CANOPY TO MATCH EXISTING RE-ROOF AREA 3:12 PITCH 3:12 PITCH 3:12 PITCH 7:12 PITCH PROPOSED ADDITION 450 SQ. FT. PRELIMINARY NO: SUPERVISOR: EXPEDITOR: DRAWN BY: CONTRACT NO: DATE: SHEET: REVISIONS "COPYRIGHT NOTICE" This design, drawing and detail is the copyrighted property of KELLER, INC. No part hereof shall be copied, duplicated, distributed, disclosed or made available to anyone without the expressed written consent of KELLER, INC. PRELIMINARY - NOT FOR CONSTRUCTIONWISCONSIN WISCONSIN DESIGNER: PROJECT MANAGER: INTERIOR DESIGNER: C1.0 02.18.2026 ACM ------- ------- P25244 ------- PROPOSED FOR: EPHRAIM, VILLAGE OF EPHRAIM VILLAGE OF EPHRAIM PROPOSED FOR: EPHRAIM, D. FLANIGAN G. STRAUB ------- 10005 NORWAY ST N 54211 NORTH SHEET INDEX C1.0 CONCEPTUAL SITE PLAN D1.0 DEMOLITION FLOOR PLANS D2.0 DEMOLITION BUILDING ELEVATIONS A1.0 FIRST FLOOR PLAN A1.1 BASEMENT FLOOR PLAN A2.0 BUILDING ELEVATIONS THE LOT DIMENSIONS AND BEARINGS SHOWN ON THIS PLAN ARE INTERPRETED VALUES. BACKGROUND INFORMATION TAKEN FROM LOCAL GIS DATE. AERIAL IMAGERY AND/OR CLIENT PROVIDED INFORMATION, EASEMENTS, STREAMS AND ROADS ARE APPROXIMATE IN NATURE. FOLLOW UP INVESTIGATION WITH STATE AND LOCAL AUTHORITIES AND/OR WITH CERTIFIED SURVEY MAP DATA WHEN AVAILABLE IS REQUIRED. 0' 20' 40' 80' 160' 1" = 40'-0" CONCEPTUAL SITE PLAN 1 03.10.2026 ACM 2 06.22.2026 ACM 3 09.04.2026 ACM 4 09.25.2026 ACM 5 6 OPTION 1 WISCONSIN CONCEPT ONLYEPHRAIM, VILLAGE OF EPHRAIM OPTION 1 DOOR & WINDOW VALUES WINDOWS: U VALUE 0.-- SHGC 0.-- VT 0.-- DOORS: U VALUE 0.38 O.H. DOORS: U VALUE 0.11 DOORS: U VALUE 0.-- SHGC 0.-- VT 0.-- (>50% GLAZING) (SWINGING) (NON-SWINGING) UPPER FLOOR 103' - 3" ASPHALT SHINGLES @ REROOF AREA WOOD TRIM BOARD TO MATCH EXISTING NEW DOWNSPOUT @ EXISTING LOCATION GUTTER & DOWNSPOUT SYSTEM ADDITIONEXISTING ASPHALT SHINGLES VERTICAL WOOD SIDING TO MATCH EXISTING WOOD CORNER TRIM NEW CANOPY TO MATCH EXISTING GUTTER & DOWNSPOUT SYSTEM ENTRY FLOOR 99' - 8" UPPER FLOOR 103' - 3" VERTICAL WOOD SIDING TO MATCH EXISTING ASPHALT SHINGLES WOOD TRIM BOARD TO MATCH EXISTING NEW CANOPY TO MATCH EXISTING WOOD CORNER TRIM 3 : 12 PITCH ENTRY FLOOR 99' - 8" 7 : 12 PITCH HORIZONTAL WOOD SIDING TO MATCH EXISTING ASPHALT SHINGLES @ REROOF AREA WOOD TRIM BOARD TO MATCH EXISTING GABLE VENT WOOD TRIM BOARD TO MATCH EXISTING 3 : 12 PITCH UPPER FLOOR 103' - 3" VERTICAL WOOD SIDING TO MATCH EXISTING GUTTER & DOWNSPOUT SYSTEM ASPHALT SHINGLES @ REROOF AREA WOOD TRIM BOARD TO MATCH EXISTING NEW DOWNSPOUTS @ EXISTING LOCATIONS GUTTER & DOWNSPOUT SYSTEM WOOD CORNER TRIM ENTRY FLOOR 99' - 8" VERTICAL WOOD SIDING TO MATCH EXISTING ASPHALT SHINGLES WOOD CORNER TRIM GUTTER & DOWNSPOUT SYSTEM PRELIMINARY NO: SUPERVISOR: EXPEDITOR: DRAWN BY: CONTRACT NO: DATE: SHEET: REVISIONS "COPYRIGHT NOTICE" This design, drawing and detail is the copyrighted property of KELLER, INC. No part hereof shall be copied, duplicated, distributed, disclosed or made available to anyone without the expressed written consent of KELLER, INC. PRELIMINARY - NOT FOR CONSTRUCTION WISCONSIN DESIGNER: PROJECT MANAGER: INTERIOR DESIGNER: A2.0 02.18.2026 ACM ------- ------- P25244 ------- PROPOSED FOR: EPHRAIM, VILLAGE OF EPHRAIM D. FLANIGAN G. STRAUB ------- 10005 NORWAY ST N 54211 1 03.10.2026 ACM 2 06.22.2026 ACM 3 09.04.2026 ACM 4 09.25.2026 ACM 5 6 1/4" = 1'-0" EAST ELEVATION 1/4" = 1'-0" NORTH ELEVATION 1/4" = 1'-0" SOUTH ELEVATION 1/4" = 1'-0" WEST ELEVATION OPTION 1 PIPING ALONG WALL INSIDE OF TALL CABINETS UNEXCAVATED UP UP STORAGE / FLEX MECH. KITCHEN MECHANICAL STAIR STAIR INFILL FLOOR @ LOCATION OF DEMOLISHED CHIMNEY OPTION TO LEAVE CHIMNEY IN PLACE ON THIS LEVEL INFILL EXISTING OPENING TYPICAL EXISTING WALL DEMO WALLS WALL KEY NEW WALL/FURRING NEW MASONRY/ VENEER WALL NEW COOLER/ FREEZER WALLS NEW PRECAST WALL FIRE WALL OR FIRE BARRIER NEW IMP WALL NEW FOUNDATION WALL EXISTING MASONRY WALL DEMO MASONRY WALL PRELIMINARY NO: SUPERVISOR: EXPEDITOR: DRAWN BY: CONTRACT NO: DATE: SHEET: REVISIONS "COPYRIGHT NOTICE" This design, drawing and detail is the copyrighted property of KELLER, INC. No part hereof shall be copied, duplicated, distributed, disclosed or made available to anyone without the expressed written consent of KELLER, INC. PRELIMINARY - NOT FOR CONSTRUCTION WISCONSIN DESIGNER: PROJECT MANAGER: INTERIOR DESIGNER: A1.1 02.18.2026 ACM ------- ------- P25244 ------- PROPOSED FOR: EPHRAIM, VILLAGE OF EPHRAIM D. FLANIGAN G. STRAUB ------- 10005 NORWAY ST N 54211 1 03.10.2026 ACM 2 06.22.2026 ACM 3 09.04.2026 ACM 4 09.25.2026 ACM 5 6 1/4" = 1'-0" BASEMENT FLOOR PLAN NORTH OPTION 1 TYPICAL EXISTING WALL DEMO WALLS WALL KEY NEW WALL/FURRING NEW MASONRY/ VENEER WALL NEW COOLER/ FREEZER WALLS NEW PRECAST WALL FIRE WALL OR FIRE BARRIER NEW IMP WALL NEW FOUNDATION WALL EXISTING MASONRY WALL DEMO MASONRY WALL DN UP PASSAGE STAIR PASSAGE JAN. WOMEN'S TOILET UTILITY SINK ELEV. TRANSACTION COUNTER OFFICE LOCKABLE BUILT-IN A/V CABINET LAT. FILESLAT. FILES LAT. FILES LAT. FILES TVTV TV TV COPY / WORK OFFICE OFFICE 9'-5" 3 1/2" 9'-5" 3 1/2" 22'-6 1/4" (25 SEATS) MOTORIZED SOLAR SHADES BREAK ROOM MEETING ROOM INFILL FLOOR @ LOCATION OF DEMOLISHED CHIMNEY 3'-8 3/4" 5 1/2" 7'-1" UNISEX TOILET 8'-5 3/8" 3 1/2" 6'-11 1/4" 3 1/2" 10'-10 5/8" STORAGE / ELECTION STORAGE23'-9 1/2" LINE OF CANOPY ABOVE TO MATCH EXISTING COPIER PASSAGE 12'-8 3/4" 3 1/2" 5'-8" 3 1/2" 4'-9 3/4" 30" REF.MICRO COFFEE 18" MIN. TV 3" GAP ALCOVE 8'-4 5/8" 3 1/2" 3'-8 3/4" 11'-3 1/4" MEN'S TOILET 100' - 0" 103' - 3" RAMP UP RAMP UP14'-6" RAMP 28'-6" RAMP 102' - 0 1/2" 105' - 0" 107' - 0" 11'-6" 2'-9" 41'-0" 12'-0"3'-0" 5 1/2" 3'-0"9'-5"3'-0" 5 1/2" 3'-0"6'-8" 99' - 8" 103' - 3" ADDITIONEXISTING 5'-7 3/8" 4'-0" 1'-4" ENTRY NEW 5'-0" WIDE OPENING 103' - 3" DUSTCOVER OVER EXISTING STAIR DUSTCOVER OVER EXISTING STAIR HALFWALL DS DS DS DN 10'-11 3/8" 18" MIN. SERVER RAMP ADDITION 450 SF LOCKABLE BUILT-IN A/V CABINET TV TV 3 1/2" 22'-6 1/4" MOTORIZED SOLAR SHADES INFILL FLOOR @ LOCATION OF DEMOLISHED CHIMNEY 23'-9 1/2" REGISTRATION BALLOTS OBSERVATION POLLING BOOTHS ADA ELECTRONIC BALLOT BOX ELECTION ROOM PRELIMINARY NO: SUPERVISOR: EXPEDITOR: DRAWN BY: CONTRACT NO: DATE: SHEET: REVISIONS "COPYRIGHT NOTICE" This design, drawing and detail is the copyrighted property of KELLER, INC. No part hereof shall be copied, duplicated, distributed, disclosed or made available to anyone without the expressed written consent of KELLER, INC. PRELIMINARY - NOT FOR CONSTRUCTION WISCONSIN DESIGNER: PROJECT MANAGER: INTERIOR DESIGNER: A1.0 02.18.2026 ACM ------- ------- P25244 ------- PROPOSED FOR: EPHRAIM, VILLAGE OF EPHRAIM D. FLANIGAN G. STRAUB ------- 10005 NORWAY ST N 54211 NORTH 1/4" = 1'-0" FIRST FLOOR PLAN 1 03.10.2026 ACM 2 06.22.2026 ACM 3 09.04.2026 ACM 4 09.25.2026 ACM 5 6 OPTION 1 1/4" = 1'-0" ALTERNATE FIRST FLOOR PLAN LAYOUT NORTH BUILDING CODE ANALYSIS APPLICABLE CODES 2021 International Building Code (w/ WI Amendments) ASHRAE Standard 90.1-2019 2021 IEBC (Level # Alteration) OCCUPANCY --- Accessory Use ---- Incidental Use ---- High-Piled Combustible Storage YES/NO Hazardous Materials YES/NO Multiple Control Areas YES/NO HEIGHT & AREA Building Height: -'--" Maximum Allowed: -'--" Number of Stories: -- Maximum Allowed: -- Total Building Area: -,--- S.F. Maximum Allowed: -,--- S.F. Total Fire Area: -,--- S.F. Maximum Allowed: -,--- S.F. Mixed/Separated Occupancies Unlimited Area Building YES/NO CONSTRUCTION TYPE Construction Classification -B Fire Separation Distance -'--" FIRE PROTECTION SYSTEMS Assumed Sprinkler Type -- Fire Alarm System YES/NO MEANS OF EGRESS Occupant Load -- Panic Hardware YES/NO STRUCTURAL DESIGN Risk Category -- Design Loads Roof Live Load -- psf Walk-on IMP Ceiling Live Load -- psf Steel Framing Collateral Load -- psf Wood Truss Top Chord Dead Load -- psf Bottom Chord Load -- psf Mezzanine/Second Floor/Basement Live Load -- psf Point Load (Partition) -- psf Snow Load Criteria Ground Snow Load (Pg) -- psf Exposure Factor (Ce) -- Thermal Factor (Ct) -- Wind Loads Wind Load -- MPH Surface Roughness -- Exposure Category -- Earthquake Load Criteria Soil Site Class -- Ss -- S1 -- PLUMBING SYSTEMS Mens WC Required # Womens WC Required # Drinking Fountain Required # Other Source YES/NO Ambulatory Stall Required YES/NO MECHANICAL SYSTEMS NO SINGLE PIECE OF EQUIPMENT OVER 400,000 BTU NO BOILERS OVER 15 PSI AND 10 HORSEPOWER SITE INFORMATION SITE CONTENT Building Size -,--- S.F. -.--% Hard Surface -,--- S.F. -.--% Green Space -,--- S.F. -.--% Parcel Size (Approx.) -,--- S.F. -.-- Acres Parking Provided -- Stalls Area of Disturbance -,--- S.F. ZONING Property Zoning -- Setbacks FY -'--" SY -'--" RY -'--" Hard Surface Setback -'--" Coverage Limit --% Greenspace Requirement --% Parking Required -- Stalls Refuse Enclosure YES/NO RTU SCREENING YES/NO FLOOR AREAS SECOND FLOOR BUILDING & FIRE AREA SQUARE FOOTAGES FIRST FLOOR CANOPIES (COLUMN SUPPORTED) BASEMENT EXISTING NEW ------ S.F. SUB-TOTAL BUILDING AREA SUB-TOTALS MEZZANINES FIRE AREA TOTALS ------ S.F. ------ S.F. 2,172 S.F. 820 S.F. 46 S.F. ------ S.F. 1,698 S.F. ------ S.F. 3,916 S.F. ------ S.F. ------ S.F. ------ S.F. REMODEL AREA TOTALS ------ S.F. --% OF BUILDING AREA 3,916 S.F. 2,992 S.F. 1,698 S.F. 46 S.F. 4,736 S.F. 4,736 S.F. 820 S.F. 820 S.F. CHURCH ST NORWAY ST N EXISTING BUILDING IVERSON LN EXISTING BUILDING NEW SIDEWALK NEW CANOPY TO MATCH EXISTING RE-ROOF AREA 3:12 PITCH 3:12 PITCH PROPOSED ADDITION 820 SQ. FT. PRELIMINARY NO: SUPERVISOR: EXPEDITOR: DRAWN BY: CONTRACT NO: DATE: SHEET: REVISIONS "COPYRIGHT NOTICE" This design, drawing and detail is the copyrighted property of KELLER, INC. No part hereof shall be copied, duplicated, distributed, disclosed or made available to anyone without the expressed written consent of KELLER, INC. PRELIMINARY - NOT FOR CONSTRUCTIONWISCONSIN WISCONSIN DESIGNER: PROJECT MANAGER: INTERIOR DESIGNER: C1.0 03.04.2026 ACM ------- ------- P25244 ------- PROPOSED FOR: EPHRAIM, VILLAGE OF EPHRAIM VILLAGE OF EPHRAIM PROPOSED FOR: EPHRAIM, D. FLANIGAN G. STRAUB ------- 10005 NORWAY ST N 54211 NORTH SHEET INDEX C1.0 CONCEPTUAL SITE PLAN D1.0 DEMOLITION FLOOR PLANS D2.0 DEMOLITION BUILDING ELEVATIONS A1.0 FIRST FLOOR PLAN A1.1 BASEMENT FLOOR PLAN A2.0 BUILDING ELEVATIONS THE LOT DIMENSIONS AND BEARINGS SHOWN ON THIS PLAN ARE INTERPRETED VALUES. BACKGROUND INFORMATION TAKEN FROM LOCAL GIS DATE. AERIAL IMAGERY AND/OR CLIENT PROVIDED INFORMATION, EASEMENTS, STREAMS AND ROADS ARE APPROXIMATE IN NATURE. FOLLOW UP INVESTIGATION WITH STATE AND LOCAL AUTHORITIES AND/OR WITH CERTIFIED SURVEY MAP DATA WHEN AVAILABLE IS REQUIRED. 0' 20' 40' 80' 160' 1" = 40'-0" CONCEPTUAL SITE PLAN 1 04.29.2026 ACM 2 06.22.2026 ACM 3 09.04.2026 ACM 4 09.25.2026 ACM 5 6 OPTION 2 WISCONSIN CONCEPT ONLYEPHRAIM, VILLAGE OF EPHRAIM OPTION 2 DOOR & WINDOW VALUES WINDOWS: U VALUE 0.-- SHGC 0.-- VT 0.-- DOORS: U VALUE 0.38 O.H. DOORS: U VALUE 0.11 DOORS: U VALUE 0.-- SHGC 0.-- VT 0.-- (>50% GLAZING) (SWINGING) (NON-SWINGING) FINISH FLOOR 100' - 0" UPPER FLOOR 103' - 3" LOWER LEVEL 93' - 9" ASPHALT SHINGLES @ REROOF AREA WOOD TRIM BOARD TO MATCH EXISTING NEW DOWNSPOUT @ EXISTING LOCATION GUTTER & DOWNSPOUT SYSTEM ADDITIONEXISTING ASPHALT SHINGLES VERTICAL WOOD SIDING TO MATCH EXISTING WOOD CORNER TRIM LOBBY FLOOR 99' - 8" NEW CANOPY TO MATCH EXISTING UPPER FLOOR 103' - 3" VERTICAL WOOD SIDING TO MATCH EXISTING ASPHALT SHINGLES WOOD TRIM BOARD TO MATCH EXISTING NEW CANOPY TO MATCH EXISTING WOOD CORNER TRIM 3 : 12 PITCH ADDITIONEXISTING GUTTER & DOWNSPOUT SYSTEM LOBBY FLOOR 99' - 8" 7 : 12 PITCH ASPHALT SHINGLES @ REROOF AREA FINISH FLOOR 100' - 0" UPPER FLOOR 103' - 3" HORIZONTAL WOOD SIDING TO MATCH EXISTING ASPHALT SHINGLES @ REROOF AREA WOOD TRIM BOARD TO MATCH EXISTING GABLE VENT WOOD TRIM BOARD TO MATCH EXISTING 3 : 12 PITCH EXISTINGADDITION VERTICAL WOOD SIDING TO MATCH EXISTING GUTTER & DOWNSPOUT SYSTEM WOOD CORNER TRIM NEW DOOR FINISH FLOOR 100' - 0" UPPER FLOOR 103' - 3" LOWER LEVEL 93' - 9" VERTICAL WOOD SIDING TO MATCH EXISTING GUTTER & DOWNSPOUT SYSTEM ASPHALT SHINGLES WOOD TRIM BOARD TO MATCH EXISTING NEW DOWNSPOUTS @ EXISTING LOCATIONS GUTTER & DOWNSPOUT SYSTEM WOOD CORNER TRIM EXISTINGADDITION LOBBY FLOOR 99' - 8" ASPHALT SHINGLES @ REROOF AREA PRELIMINARY NO: SUPERVISOR: EXPEDITOR: DRAWN BY: CONTRACT NO: DATE: SHEET: REVISIONS "COPYRIGHT NOTICE" This design, drawing and detail is the copyrighted property of KELLER, INC. No part hereof shall be copied, duplicated, distributed, disclosed or made available to anyone without the expressed written consent of KELLER, INC. PRELIMINARY - NOT FOR CONSTRUCTION WISCONSIN DESIGNER: PROJECT MANAGER: INTERIOR DESIGNER: A2.0 03.04.2026 ACM ------- ------- P25244 ------- PROPOSED FOR: EPHRAIM, VILLAGE OF EPHRAIM D. FLANIGAN G. STRAUB ------- 10005 NORWAY ST N 54211 1 04.29.2026 ACM 2 06.22.2026 ACM 3 09.04.2026 ACM 4 09.25.2026 ACM 5 6 1/4" = 1'-0" EAST ELEVATION 1/4" = 1'-0" NORTH ELEVATION 1/4" = 1'-0" SOUTH ELEVATION 1/4" = 1'-0" WEST ELEVATION OPTION 2 PIPING ALONG WALL INSIDE OF TALL CABINETS UNEXCAVATED UP UP STORAGE / FLEX MECH. KITCHEN MECHANICAL STAIR STAIR INFILL FLOOR @ LOCATION OF DEMOLISHED CHIMNEY OPTION TO LEAVE CHIMNEY IN PLACE ON THIS LEVEL UNEXCAVATED UNEXCAVATED CLOSE UP WINDOW OPENING 4'-0" 42'-0" 41'-0" 13'-11 3/4" CLOSE UP WINDOW OPENING TYPICAL EXISTING WALL DEMO WALLS WALL KEY NEW WALL/FURRING NEW MASONRY/ VENEER WALL NEW COOLER/ FREEZER WALLS NEW PRECAST WALL FIRE WALL OR FIRE BARRIER NEW IMP WALL NEW FOUNDATION WALL EXISTING MASONRY WALL DEMO MASONRY WALL PRELIMINARY NO: SUPERVISOR: EXPEDITOR: DRAWN BY: CONTRACT NO: DATE: SHEET: REVISIONS "COPYRIGHT NOTICE" This design, drawing and detail is the copyrighted property of KELLER, INC. No part hereof shall be copied, duplicated, distributed, disclosed or made available to anyone without the expressed written consent of KELLER, INC. PRELIMINARY - NOT FOR CONSTRUCTION WISCONSIN DESIGNER: PROJECT MANAGER: INTERIOR DESIGNER: A1.1 03.04.2026 ACM ------- ------- P25244 ------- PROPOSED FOR: EPHRAIM, VILLAGE OF EPHRAIM D. FLANIGAN G. STRAUB ------- 10005 NORWAY ST N 54211 1 04.29.2026 ACM 2 06.22.2026 ACM 3 09.04.2026 ACM 4 09.25.2026 ACM 5 6 1/4" = 1'-0" BASEMENT FLOOR PLAN NORTH OPTION 2 TYPICAL EXISTING WALL DEMO WALLS WALL KEY NEW WALL/FURRING NEW MASONRY/ VENEER WALL NEW COOLER/ FREEZER WALLS NEW PRECAST WALL FIRE WALL OR FIRE BARRIER NEW IMP WALL NEW FOUNDATION WALL EXISTING MASONRY WALL DEMO MASONRY WALL DN UP STORAGE STAIR PASSAGE JAN. UNISEX TOILET UTILITY SINK ELEV. WORK / BREAK WOMEN'S TOILET MEN'S TOILET 7'-7 1/4" 3 1/2" 9'-2 3/4" 29'-7 7/8" 3 1/2" 4'-9 1/4" 3 1/2" 6'-5 5/8" 5 1/2" (49 MAX. OCCUPANCY) MOTORIZED SOLAR SHADES OFFICE MEETING ROOM INFILL FLOOR @ LOCATION OF DEMOLISHED CHIMNEY OFFICE OFFICE 4'-0" 3'-0" 6'-4" 15'-8" 6'-4" 10'-8" 9'-8 3/8" 3 1/2" 10'-2 3/4" 6" 8'-3 15/16" SERVER PASSAGE 30" REF. MICROCOFFEE CEILING MOUNTED MOTORIZED PROJECTION SCREEN TV BABY CHANGING STATION BABY CHANGING STATION 30" DEEP COUNTERTOP @ 30" A.F.F. COPIER TV LAT. FILES LAT. FILES TV TV LAT. FILES LAT. FILES TRANSACTION WINDOW AT 42" A.F.F. LAT. FILES LAT. FILES 103' - 3" CAP OVER EXISTING STAIR 42'-0" 41'-0" RAMP UP RAMP UP 14'-6" RAMP 28'-6" RAMP UP ENTRY LOBBY 6" 13'-7 1/4" 3 1/2" 5'-1 1/4" 3 1/2" 13'-9" 5 1/2" 7'-6" 6" 6" 11'-4 1/2" 3 1/2" 8'-7 1/4" 3 1/2" 19'-5 1/4" 6" 13'-11 3/4" 6'-3" 6'-4" 1'-4 3/4" 12'-0"3'-0" 5 1/2" 3'-0"9'-5"3'-0" 5 1/2" 3'-0"6'-8" 19'-0 13/16" 3 1/2" 5'-3" 3 1/2" 6'-7 1/4" 3 1/2" 11'-8" 5'-9 5/8" 3 1/2" 8'-8 3/4"3 1/2"8'-8 1/8" 4'-8"3 1/2" LINE OF CANOPY ABOVE TO MATCH EXISTING 99' - 3 1/4" 99' - 8" 102' - 0 1/2" 103' - 3" NEW 5'-0" x 8'-0" OPENING CLEAR 4'-8" NEW SIDEWALK 105' - 0" DS DS DS (20) CHAIRS SET UP AT ALL TIMES (2) FUTURE CUBICLES ELECTION STORAGE RAMP ADDITION 363 SF OFFICE ADDITION 457 SF 23'-9 1/2" 29'-7 7/8" 3 1/2" 4'-9 1/4" 3 1/2" MOTORIZED SOLAR SHADES PASSAGE CEILING MOUNTED MOTORIZED PROJECTION SCREEN TV 103' - 3" CLEAR 4'-8" (2) FUTURE CUBICLES ELECTION STORAGE 23'-9 1/2" REGISTRATION BALLOTS OBSERVATION POLLING BOOTHS ADA ELECTRONIC BALLOT BOX ELECTION ROOM PRELIMINARY NO: SUPERVISOR: EXPEDITOR: DRAWN BY: CONTRACT NO: DATE: SHEET: REVISIONS "COPYRIGHT NOTICE" This design, drawing and detail is the copyrighted property of KELLER, INC. No part hereof shall be copied, duplicated, distributed, disclosed or made available to anyone without the expressed written consent of KELLER, INC. PRELIMINARY - NOT FOR CONSTRUCTION WISCONSIN DESIGNER: PROJECT MANAGER: INTERIOR DESIGNER: A1.0 03.04.2026 ACM ------- ------- P25244 ------- PROPOSED FOR: EPHRAIM, VILLAGE OF EPHRAIM D. FLANIGAN G. STRAUB ------- 10005 NORWAY ST N 54211 NORTH 1/4" = 1'-0" FIRST FLOOR PLAN 1 04.29.2026 ACM 2 06.22.2026 ACM 3 09.04.2026 ACM 4 09.25.2026 ACM 5 6 OPTION 2 1/4" = 1'-0" ALTERNATE FIRST FLOOR PLAN LAYOUT NORTH

Source: Village of Ephraim website. First collected Nov 6, 2026.