PORTAGE COUNTY
MEETING AGENDA
HIGHWAY COMMITTEE
PORTAGE COUNTY ANNEX
CONFERENCE ROOMS 1 & 2
1462 STRONGS AVENUE
STEVENS POINT, WI 54481
Tuesday, July 21, 2026 3:30 PM
REMOTE ATTENDANCE & COMMENT
To attend this meeting by telephone : dial 1-872-242-7813, after dialing the number you will then be asked to enter in a
meeting number. Use the following meeting number: 694 554 049, then press #
To attend this meeting by video: Join the meeting now
Page 1 of 2
CALL TO ORDER
Committee Members enter Per Diem and Mileage
CORRESPONDENCE
1. National Association of Counties Transportation Funding Brief
2. US Army Corp of Engineers Stream Credit Release Letter
PRESENTATIONS
REPORTS
3. Special Meeting Attendance Reports (Portage County Ordinance 3.1.47 & 3.1.48)
4. Commissioner’s Report
PUBLIC NOTICE
Members of the public who wish to address the Committee on specific agenda items must register their request at this time,
with such comments subject to the public comment ordinance and the reasonable control of the Committee Chair as set forth
in Robert’s Rules of Order.
APPROVAL OF MINUTES
5. Approval of May 19, 2026 Minutes
DISCUSSION/POSSIBLE ACTION
6. Discussion and Possible Action on CTH Y(STH 66 to Dewey Drive) Preliminary Speed Study Results
7. Discussion and Possible Action on CTH KK(Timberline Road to CTH A) Preliminary Speed Study Results
8. Discussion and Possible Action on Rumble Strip Installation on CTH N east of CTH BB, Town of Buena Vista
9. Discussion and Possible Action on CTH E(CTH HH – Dam Road) Project Budget Amendment Request
10. Discussion and Possible Action on Contract with Terra Ventures for Professional Real Estate Services for CTH R
Project
11. Discussion and Possible Action on 2027 Equipment Purchase – Underbody Plows
NEXT MEETING DATE
ADJOURNMENT
Page 1 of 62
Highway Committee Meeting Agenda July 21, 2026
Page 2 of 2
Notice: Any person who has special needs and plans on attending this meeting in-person or remotely should contact the Facilities at 715-
346-1598 as soon as possible to ensure that reasonable accommodations can be made.
Notice: Remote comment by the public during the meeting will be at the discretion of the Chair.
Notice: A quorum of the Portage County Board of Supervisors, or any committee thereof, may be present at this meeting.
Page 2 of 62
Bridging the Gap for Surface Transportation:
Why Counties Need a Stronger
Federal Investment Partnership
Page 3 of 62
2 | Bridging the Gap for Surface Transportation: Why Counties Need a Stronger Federal Investment Partnership
Surface Transportation Reauthorization Is
Critical for the Nation’s Infrastructure
America’s surface transportation system connects
our communities and powers the national economy,
yet its roads face a $684 billion funding gap over the
next decade.¹ Counties own and maintain 44% of public
roads and 38% of bridges, infrastructure essential not
only for daily travel but also for economic competitiveness,
national security and quality of life. As supply chains
grow more complex and freight movement increases,
our roads are carrying more traffic and heavier loads
than ever before. Yet as demands grow and construction
costs skyrocket, this locally owned infrastructure is
deteriorating rapidly.
Despite the central role counties play in transportation,
we remain structurally disadvantaged in accessing
infrastructure funding. Although counties own 28%
of federal-aid highway miles, states direct only
about 14% of transportation funding to local
governments overall, including counties, cities and
towns.² Counties also face disadvantages in purchasing
materials and competing for labor, as states often benefit
from larger federal subsidies and purchasing power.
Overall, just 6.2% of total local government revenue
comes directly from the federal government.³
This imbalance is worsening as infrastructure needs
outpace available revenue and construction costs
continue to rise. Nearly 40% of major U.S. roads are
in poor or mediocre condition, 4 and over 40,000
bridges are structurally deficient. 5 Driving on
deteriorated, congested roads costs the average driver
more than $1,400 annually in vehicle operating costs and
lost time,6 while inadequate roadway safety contributes
to at least one-third of fatal crashes. 7
Counties cannot address this challenge alone. In 40
states, counties face significant state-imposed fiscal
constraints that limit our ability to raise revenue
when state and federal funding falls short.8 Congress
must act to restore balance and ensure counties have the
resources to keep America moving safely and efficiently.
NACo’s Ask: Counties Cannot Close the Gap Alone
A modern, balanced and reliable federal investment strategy is essential to ensure safe travel, economic stability and
long-term resilience. Congress must provide counties with the necessary tools and resources:
Increase federal
investment in county-
owned roads and bridges —
counties maintain nearly half of
America’s public roads but receive
only a small share of federal
formula transportation funding.
Congress must increase the share
of formula funds available for local
use from 15% to 25%.
Simplify and accelerate
access to federal
grants — discretionary
grants are vital, but administrative
burdens limit their effectiveness.
Congress should preserve these
programs while making them
easier to apply for and implement.
Improve planning and
project delivery —
counties often rely on metropolitan
planning organizations (MPOs) and
rural/regional transportation planning
organizations (RTPOs) to implement
federal dollars. Congress must
strengthen planning and project
selection to ensure that counties can
access intended funding.
Page 4 of 62
Bridging the Gap for Surface Transportation: Why Counties Need a Stronger Federal Investment Partnership | 3
By the Numbers
Counties need federal support to help close the nation’s $684 billion
roadway funding gap.
Counties Own and Maintain:
44%
of public road miles –
over 1.8 million miles
28%
of the 1.03 million
federal-aid highway
road miles
38%
of all U.S. bridges –
229,334 in total
Infrastructure
Conditions and Safety
Risks are Worsening
Funding Has Not
Kept Pace With County
Responsibilities
Nearly 40% of roads are in poor or
mediocre condition
Over 40,000 bridges are
structurally deficient
40,990 traffic fatalities in 2023
(47% on rural roads), up 24% over
the past decade
Counties own 28% of federal-
aid highway miles, but
only 14% of state-controlled
transportation funding is directed
to local governments
Page 5 of 62
4 | Bridging the Gap for Surface Transportation: Why Counties Need a Stronger Federal Investment Partnership
America’s Surface Transportation Infrastructure
Is Deteriorating and Unsafe
Roads and bridges across the nation are at a breaking point: nearly 40% of roads nationwide are in poor or mediocre
condition, 9 reflecting years of underinvestment. The condition of locally owned infrastructure is even more concerning,
as local governments receive far less federal support than state-owned systems, resulting in consistently worse
conditions. About half (49%) of locally owned principal arterial roads, America’s major roadways, are in poor condition,
compared to just 7% of similar state-owned roads. 10
Nearly 50% of locally-owned
principal arterial roads are in poor
condition, compared to just 7% of
state-owned roads.
The struggling condition of America’s locally owned
infrastructure has real consequences for the economy.
Closed bridges and deteriorating roads lead to detours
and delays that slow supply chains and create escalating
impacts across industries. Failing infrastructure also
imposes real costs on everyday drivers, causing an
estimated $167 billion a year — or $725 per driver on
average — in additional repairs, accelerated vehicle
depreciation and increased fuel consumption and tire
wear.11
America’s deteriorating roads and bridges are not just
an economic inconvenience; they are a safety crisis.
Each day, there are 168.5 million crossings on more than
42,000 bridges rated in poor condition.12 Around 40,000
people die annually on U.S. roads, with inadequate
roadway safety features contributing to roughly one-
third of fatal crashes. 13 These concerns are especially
acute in rural areas, which account for 47% of traffic
fatalities despite being home to only 19% of Americans.14
Together, these figures make clear that infrastructure
improvements are essential not only to lower costs for
American workers and businesses but also to protect
lives nationwide.
Locally Owned Roads and Bridges are in Worse Condition Than State Infrastructure
Percent of Infrastructure in Poor Condition, by Ownership
Source: NACo Analysis of U.S. Department of Transportation - Federal Highway Administration, National Bridge Inventory (2025) and Brookings Institution
analysis of FHWA roadway data.
Bridges
4%
9% 7%
49%
Principal Arterial Roads
State Local
Page 6 of 62
Bridging the Gap for Surface Transportation: Why Counties Need a Stronger Federal Investment Partnership | 5
County Infrastructure Supports Daily Life and
Powers the American Economy
Counties are an essential link in America’s transportation network, owning over 1.8 million miles of roads, more
than any other level of government, and more than 229,000 of the nation’s bridges. 15
Reliable transportation infrastructure is the foundation
of American economic life — connecting communities,
enabling emergency response and sustaining the supply
chains, industries and daily activities on which growth
and competitiveness depend. County-owned roads
and bridges are at the center of this network, carrying
freight, supporting agriculture and manufacturing and
connecting workers to jobs. Nearly 63 million jobs in
key industries like tourism, retail sales, agriculture
and manufacturing are completely dependent on
the nation’s transportation network. 16 County-owned
infrastructure also supports emerging industries critical to
national competitiveness, including energy development,
AI data infrastructure, advanced manufacturing and
agricultural production. As these sectors grow, reliable
roads and bridges are essential to connect rural
communities, production sites and national markets.
Counties invest $60.2 billion annually in
transportation and $146 billion in infrastructure
overall,17 yet local governments receive only about 14%
of transportation funding distributed by states. As a result,
counties often rely on municipal bonds and limited local
fuel taxes to fund critical projects. With state and local
municipal bond debt now totaling $4.4 trillion, 18 much of
America’s infrastructure is financed through debt rather
than sustained federal investment.
Counties will continue investing to keep people and
goods moving safely, but stronger federal partnership
and increased investment are essential to maintain and
modernize America’s transportation system.
Counties own more public
road miles than any other level
of government.
Source: U.S. Department of Transportation - Federal Highway Administration, 2023 Highway Performance and 2024 National Bridge Inventory
Counties Own and Maintain a Significant Portion of America’s Roads and Bridges
Ownership of Road Miles and Bridges within America’s Counties
4.13M total road miles
609,737 total bridges
44% 30% 20% 6%
38% 12% 48%
Owned by
counties
Owned by other
local governments
Owned by
state agencies
Owned by
other agencies
Page 7 of 62
6 | Bridging the Gap for Surface Transportation: Why Counties Need a Stronger Federal Investment Partnership
Costs are Rising and Straining County Budgets
The increasing use of transportation infrastructure, combined with growing vehicle sizes and weights, is placing
significant strain on our transportation system, especially in counties. Meanwhile, the cost of maintenance and repair
is increasing dramatically.
Rising construction costs are a central and growing
pressure on the infrastructure funding equation.
Maintaining infrastructure is now substantially more
expensive than it was a decade ago due to rapid price
increases across the construction sector. Between
February 2020 and late 2023, overall construction
input prices rose by nearly 40%, driven by higher
costs for concrete and diesel fuel used to operate heavy
machinery and inflation. 19 More specifically, highway
Source: NACo Analysis of the Federal Highway Administration’s National Highway Construction Cost Index (NHCCI) and Highway Statistics Series Local
Government Funding for Highways (Table LGF-2)
Rising Highway Construction Costs are Outpacing Federal Investment in Local Roads
Highway Construction Costs vs. Federal Payments to Local Governments for Highways, 2003–2023 (Indexed to 2003)
2003
1.0
Year
National Highway Construction Costs Index
Local Government Funding for Highways, Payments from Federal Government
Index (2003 = 1.00)1.5
2.0
2.5
3.0
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
In Washington County, Iowa, the
cost per mile of a road paving
project nearly doubled ($495,919 to
$893,191) between 2018 and 2026. 22
construction costs have increased by about 73%
since 2021.20 Diesel fuel prices have also surged multiple
times, remaining over $3 per gallon since the start of the
COVID-19 pandemic. 21
Page 8 of 62
Bridging the Gap for Surface Transportation: Why Counties Need a Stronger Federal Investment Partnership | 7
“Aging infrastructure systems are increasingly vulnerable to natural disasters
and extreme weather events, creating unexpected and often avoidable risks
to public safety and disrupting economic activity, ultimately hampering U.S.
global competitiveness. ” - American Society of Civil Engineers 28
These rising costs are further compounded by structural
disadvantages local governments face relative to states
in purchasing materials and accessing labor. 23 State
departments of transportation, which receive the vast
majority of federal funding,24 have larger project pipelines,
more dedicated engineering staff and greater flexibility to
secure materials and labor at scale. Conversely, smaller
and rural counties face greater cost pressures and
steeper administrative burdens in delivering infrastructure
projects, 25 even as counties collectively maintain 44% of
the nation’s public road miles. Addressing these structural
disadvantages requires more direct federal investment
in locally owned infrastructure.
In addition, in July of 2025, Americans traveled more
vehicle miles in one month than ever before, over 297
billion miles total. The weight of vehicles is growing, too: in
2025 alone, at least three states enacted legislation
to raise maximum truck weights for specific goods
on non-federal highways, and many additional
states either already allow exceptions to the federal
80,000-pound limit or have introduced legislation to do
so.26 These changes are meant to increase economic
competitiveness between states and with our neighboring
countries; however, heavier trucks will continue to
damage roads, reduce our transportation capacity and,
ultimately, undermine our economic strength unless our
infrastructure investment keeps pace. The increased
adoption of electric vehicles has also expedited this
trend, as they weigh more than their internal combustion
engine (ICE) counterparts.27 Heavier vehicles cause more
frequent and destructive wear on already deteriorating
infrastructure, and as they become more frequent and
roads continue to age, maintenance costs are increasing.
As county infrastructure responsibilities grow and
maintenance costs rise, consistent federal investment
in local governments is essential — a trend that has
not materialized over the past two decades. Reliable
funding, efficient grant access and strong federal,
state and local partnerships will help counties
maintain safe roads, support communities and
strengthen local economies.
Page 9 of 62
8 | Bridging the Gap for Surface Transportation: Why Counties Need a Stronger Federal Investment Partnership
Federal Funding and State Constraints Limit
County Investment
Counties are responsible for maintaining nearly half of
the nation’s public road miles and a significant share of
its bridges, yet the transportation funding system does
not reflect this reality. Most federal transportation dollars
are distributed to states, leaving counties dependent
on state-level decisions to access critical infrastructure
funding. Local governments receive, on average, only
about 14% of transportation funding distributed
by states, despite owning and maintaining 75% of
public roads. 29 As a result, counties are expected to
maintain a substantial share of the nation’s transportation
infrastructure without direct access to a proportional
share of transportation funding.
This imbalance is driven in part by the structure
of federal transportation programs. Federal
formula funding does not provide direct, guaranteed
investments to county governments for locally owned
roads and bridges. Instead, more than 90% of federal
transportation funds flow via formula to state departments
of transportation, requiring counties to rely on state-
level suballocations or compete for a limited share of
discretionary funding. 30
Some argue that counties and other local governments
should have limited access to federal funding because
federal funds should be limited to infrastructure with an
immediate federal nexus. However, this argument
fails to account for the fact that local governments
own 43% of federal-aid highway miles, with
counties in particular accounting for 28%. 31
Despite this responsibility, local governments receive a
disproportionately small share of transportation funding
distributed by states. 32
As federal transportation revenues stagnate and
construction costs rise, the gap between available funding
and infrastructure needs continues to widen, leaving
fewer resources for states to invest in local infrastructure
and support counties. As a result, the real value of federal
transportation investments has declined, and despite
recent increases in nominal funding, the inflation-adjusted
purchasing power of federal transportation funding
remains below historical levels. 33
This imbalance extends beyond transportation funding.
In FY 2022, federal funding accounted for just 6.2%
of total local government revenue, compared to
36.1% for states, leaving counties far more reliant on
limited local revenue sources to meet growing service,
infrastructure and operational demands. 34
“Just a few short years ago in
Converse County we could
rebuild and pave a road for a
million a mile. Our last project was
just over $1.7M a mile. How do we
keep our roads in good shape with
rising costs and flat revenue?”
- Commissioner, Converse County, Wyo.
Page 10 of 62
Bridging the Gap for Surface Transportation: Why Counties Need a Stronger Federal Investment Partnership | 9
As infrastructure costs continue to rise, local governments
receive a far smaller share of federal funding than
states, limiting their ability to keep pace with growing
transportation needs. Counties also lack the authority to
generate sufficient revenue to close this gap. State laws
define the scope of county fiscal authority, including the
types of taxes counties can levy, the amount of revenue
they can raise, and the rate at which it can grow.35 Forty
states across the nation impose significant limits on
county revenue authority including caps on property
tax rates, restrictions on sales taxes and limitations on
revenue growth.36 At the same time, counties are required
to deliver a wide range of services mandated by state and
federal governments, often without adequate funding. 37
As a result, counties must operate within both federal
funding constraints and state-imposed fiscal limits, even
as local responsibilities continue to expand.
Taken together, these dynamics create a structural
mismatch between responsibility and resources.
Counties are expected to maintain and improve critical
infrastructure systems but face both limited federal
investment and restricted fiscal flexibility at the state level.
In all, the nation faces a $684 billion funding gap for
roads over the next decade. 38 As costs continue to
rise, counties are left with difficult choices: delay projects,
defer maintenance or shift more costs to local taxpayers.
Without a stronger, more direct federal partnership,
infrastructure will continue to fall behind as transportation
needs grow, costs rise and safety risks intensify.
Federal funding makes up just 6% of local government revenue, compared
to 36% for states. Local governments receive a significantly smaller share
of federal funding than states, despite their central role in delivering
infrastructure and other critical services.
Source: Adapted from Dilger, R. J. Congressional Research Service,
Federal Grants to State and Local Governments: Trends and Issues
(R40638), June 26, 2025. https://www.congress.gov/crs-product/R40638
Local Governments Receive a Much Smaller Share
of Federal Funding Than States
Federal Funds to State and Local Governments, FY2022
Federal
Governments$146.3 billion in FY2022
$662.3 billion in FY2022
28.2% of total local government revenue
$1.112 trillion in FY2022
36.1% of total state government revenue
6.2% of total local government revenue
Local State
Page 11 of 62
10 | Bridging the Gap for Surface Transportation: Why Counties Need a Stronger Federal Investment Partnership
Bottom Line
Counties are responsible for maintaining much of the
transportation systems that keep America moving, but
the current transportation funding structure does not
match those responsibilities. The combination of rising
construction costs, state-imposed fiscal constraints and
growing infrastructure demands has created a widening
gap between what counties are expected to maintain and
what they have the resources to sustain.
Congress has the opportunity to address this situation
in the upcoming surface transportation reauthorization
bill, which will set federal funding levels for transportation
programs for the next five years and enact policy changes
on how those funds are spent.
Without a stronger federal partnership, county-owned
infrastructure will continue to fall behind as costs rise,
safety risks grow and infrastructure needs compound.
A modern, balanced and reliable federal investment
strategy, one that reflects the position of county
governments in maintaining the nation’s transportation
network, is essential to ensure safe travel, economic
stability and long-term resilience.
Scan the QR code to view Surface
Transportation Stats by County
County of Santa Clara, County Roads Team Ensures Safety and Efficiency for Motorists, Youtube
Page 12 of 62
Bridging the Gap for Surface Transportation: Why Counties Need a Stronger Federal Investment Partnership | 11
Endnotes
1 American Society of Civil Engineers. (2025). 2025 infrastructure report card: A comprehensive assessment of America’s infrastructure.
2 Tomer, A. and Ben Swedberg (2024, November 12). Connecting the DOTs: A survey of state transportation planning, investment, and accountability practices.
3 Even when federal funds passed through states are included, local governments remain chronically underfunded relative to their infrastructure responsibilities. Levin, A. G. (2025, June 26).
Federal grants to state and local governments: Trends and issues (CRS Report No. R40638). Congressional Research Service.
4 American Society of Civil Engineers. (2025). 2025 infrastructure report card: A comprehensive assessment of America’s infrastructure. ASCE.
5 NACo Analysis of U.S. Department of Transportation - Federal Highway Administration, 2024 National Bridge Inventory.
6 Munoz, SJ (2025, March 26). American Society of Civil Engineers releases infrastructure report card.
7 National Transportation Research Group. (2026, April). Key facts about the U.S. surface transportation system.
8 Harris, J., & Zmuda, T. (2025, February). The County Landscape Project: County government taxes and revenues. National Association of Counties.
9 American Society of Civil Engineers. (2025). 2025 infrastructure report card: A comprehensive assessment of America’s infrastructure.
10 Tomer, A. and Ben Swedberg (2025, April 24). Highway Shakedown: How local road users are subsidizing state highway investments.
11 Consumer Reports (2026, March 23). As Crumbling Roads Increase Costs for American Drivers, Consumer Reports Looks at Fair, Effective Ways to Fund Transportation.
12 American Road & Transportation Builders Association (2024). ARTBA Bridge Report,
13 In 2023, the exact number was 40,990. In 2025, the number decreased slightly to 36,640. While this number has been steadily declining since 2022, overall traffic deaths have not returned
to pre-pandemic levels. Source: National Center for Statistics and Analysis (2024, April). Early estimate of motor vehicle traffic fatalities in 2023 (Traffic Safety Facts Crash. Stats Brief Statistical
Summary. Report No. DOT HS 813 561). National Highway Traffic Safety Administration.
14 U.S. Department of Transportation (2025, March 17). The Critical Role of Rural Communities in the U.S. Transportation System.
15 NACo Analysis of U.S. Department of Transportation - Federal Highway Administration, 2023 Highway Performance and 2025 National Bridge Inventory.
16 National Asphalt Pavement Association (2020, April). Key Facts about the U.S. Surface Transportation System.
17 NACo Analysis of U.S. Census Bureau - 2022 Census of Individual Governments: Finance.
18 SIFMA (2026, April 1). US Municipal Bonds Statistics.
19 Warnock, T. (2024, December 30). The cost of these 5 construction materials grew the most in 2023. Machinery Partner.
20 Federal Highway Administration, (2024, September 30). National Highway Construction Cost Index (NHCCI).
21 U.S. Energy Information Administration, (2026, May 1). US Diesel Sales Price [GASDESW], retrieved from FRED, Federal Reserve Bank of St. Louis.
22 National Association of County Engineers (2026).
23 Aoun, J., & Goldsmith, S. (2021, November 16). Modernizing American infrastructure requires people and procurement, not just dollars. Brookings Institution.
24 National Association of Counties (NACo). The Bipartisan Infrastructure Law: Examining Investments in County Infrastructure — Analyzing FY 2022 Federal Competitive Transportation Awards.
25 Wessel, D. (2024, August 7). Why does building and maintaining highways in the US cost so much? Brookings Institution.
26 Goble, K. (2025, July 14). States adopt truck weight rule changes, extension.
27 Wessel, D. (2024, August 7). Why does building and maintaining highways in the US cost so much? Brookings Institution.
28 American Society of Civil Engineers (2025). ASCE Report Card Gives U.S. Infrastructure Highest-Ever ‘C’ Grade, Stresses Need for Sustained Investment to Support Economic Growth.
29 NACo Analysis of the U.S. Department of Transportation - Federal Highway Administration, 2023 Highway Performance data.
30 National Association of Counties (NACo). The Bipartisan Infrastructure Law: Examining Investments in County Infrastructure — Analyzing FY 2022 Federal Competitive Transportation Awards.
31 A federal-aid highway is any public road that is part of the Federal-Aid Highway System, meaning it is eligible to receive federal funding for construction, maintenance and improvement.
These highways are not limited to the interstate system; they include a wide range of roads that serve national, regional and local transportation needs.
32 Tomer, A. and Ben Swedberg (2024, November 12). Connecting the DOTs: A survey of state transportation planning, investment, and accountability practices.
33 Federal highway funding increased significantly in nominal terms under the Infrastructure Investment and Jobs Act; however, inflation has eroded much of this growth, leaving inflation-
adjusted funding levels below those of the mid-2000s.; Lohman, A. E. (2026, February 5). Surface transportation reauthorization: Federal highway programs (CRS Report No. R48845, Version
4). Congressional Research Service.
34 Levin, A. G. (2025, June 26). Federal grants to state and local governments: Trends and issues (CRS Report No. R40638). Congressional Research Service.
35 Harris, J., & Zmuda, T. (2025, February). The County Landscape Project: County government taxes and revenues. National Association of Counties.
36 Ibid.
37 Ibid.
38 American Society of Civil Engineers. (2025). 2025 infrastructure report card: A comprehensive assessment of America’s infrastructure. ASCE.
Page 13 of 62
May 2026
660 North Capitol Street NW
Suite 400 | Washington, D.C. 20001
202-393-6226 | www.NACo.org
@NACoCounties
Page 14 of 62
DEPARTMENT OF THE ARMY
U.S. ARMY CORPS OF ENGINEERS, ST. PAUL DISTRICT
332 MINNESOTA STREET, SUITE E1500
ST. PAUL, MN 55101-1323
June 23, 2026
Electronic copy furnished:
Nichole Deweese, EPA - Region 5
Chelsey Lundeen, Wisconsin DNR
Leslie Day, COE
Jon Gumtow, Merjent
Regulatory File No. MVP-2021-00685-EMN
Portage County Highway Department
c/o Nathan Check
800 Plover Road
Plover, Wisconsin 54467
Dear Mr. Check:
This letter is in response to your request for the release of 25% (Year 1) of the stream
credits from the Little Plover River Mitigation Bank located in Portage County, Wisconsin. Based
on your submittal of the 2025 monitoring report, a site visit on June 9, 2026, and comments from
the Interagency Review Team, we approve the release of 328.5 functional feet (FF) of stream
credits from your bank in accordance with the credit release schedule on pages 5-8 of the MBI.
The amount and type of credit approved for release are summarized in the attached table.
Please note that we recommend you collect monitoring data on the “percent riffles” for
Monitoring Reach 1 and 2 this growing season as discussed during our June 9, 2026 site visit. It
appears that there are more riffles than what was documented in the 2025 monitoring report, but
this information would be useful to determine if any corrective actions are needed prior to full
SQT monitoring in 2027. In addition, it appeared that some of the woody material used in the
stream is not large enough to count as large woody debris as defined in the SQT. You may want
to consider adding larger wood to the stream to meet this metric in the future and provide in-
stream habitat for macroinvertebrates and fish to aid your biology scores.
According to our records, we have released a total of 7.18 federal wetland credits and 591.3
FF stream credits for your sale to permittees needing to satisfy compensatory mitigation
requirements for Department of the Army permits. We track Federally approved credits in the
Corps’ Regulatory In-lieu Fee and Bank Information Tracking System (RIBITS) and have
updated the RIBITS ledger for your bank to reflect the credit release approved by this letter.
If you have any questions, please contact me in our Stevens Point office at (651) 290-5879
or eric.m.norton@usace.army.mil. In any correspondence or inquiries, please refer to the
Regulatory file number shown above.
Sincerely,
Eric Norton
Project Manager
Enclosure:
Credit Release Tables
Page 15 of 62
2026 CREDIT RELEASE TABLES
LITTLE PLOVER RIVER MITIGATION BANK
Type of
Compensation
# of
Acres
Type of
Wetland
Credit
Credit
Ratio
Final
Projected
Credits
10% MBI
Approval
Credit
Release
Aug 2025
10% As-
Built
Credit
Release
Aug 2025
Total
Credits
Released
to Date
Re-establishment 18.08
Wet
Meadow 1:1 18.08 1.81 1.81 3.62
Re-establishment
(ERA) 5.60
Wet
Meadow 0.5:1 2.80 0.28 0.28 0.56
Re-establishment
(RCA) 0.25
Wet
Meadow 0.5:1 0.13 0.01 0.01 0.02
Rehabilitation I 2.50
Wet
Meadow 1:1 2.50 0.25 0.25 0.50
Rehabilitation I
(ERA) 0.85
Wet
Meadow 0.5:1 0.43 0.04 0.04 0.08
Rehabilitation II 3.13
Hardwood
Swamp 0.75:1 2.35 0.24 0.24 0.48
Enhancement 1.82
Hardwood
Swamp 0.33:1 0.60 0.06 0.06 0.12
Upland Buffer
(may not
contribute to
more than 25%
total bank
credits)
39.96
Wet
Meadow
0.25:1
(8.96
credits)
7.85 0.79 0.79 1.58
Hardwood
Swamp 1.11 0.11 0.11 0.22
Total 68.56 35.85 3.59 3.59 7.18
Credit Release Event
(date approved)
Functional Feet Cumulative Functional
Feet Released to Date
First Release:
Executed MBI, FA,
CE (8/2025) 10%
131.4 131.4
Second Release: As-
built (8/2025) 10%
131.4 262.8
Third Release:
Performance/Year 1
(June 2026) 25%
328.5 591.3
Total 591.3
Total stream credits released: 591.3 FF
Page 16 of 62
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
Date: July 16, 2026
To: Highway Committee
From: Nathan Check, P.E.
Subject: Commissioner’s Report
Please see below for a number of Highway Department Updates.
Staffing – Our new County Surveyor Tony Dallman sta rted on May 26
th and will be introduced
at the meeting. He will also be attending the July 27 th Portage County Unity Wisconsin Towns
Association Meeting to be introduced to that group as well.
All other full-time positions are filled.
Updates are below for the seasonal positions:
-Civil Technician – It has been a struggle getting candidates to apply. The first candidate was
offered the position but was not able to get a valid driver’s license. An offer was extended to a
second qualified candidate but he declined due to the seasonal nature of the position. Another
candidate was interviewed this week but will be returning full-time to school this Fall. We are
looking at possible part-time hours through the Fall with this candidate.
Seasonal Laborers – Only two of five positions were filled with one employee only working 120
hours before not showing back up to work. The other candidate recently took a full-time
position with the City. He is working Tuesday through Friday with the City and has been
returning to work for us on Mondays still.
Summer Help – Six of six positions have been filled .
The inability to fill these positions is estimated to leave over 4,000 work hours unused.
Training – All tractor/mower operators have completed the in ternal training and testing. Only
one seasonal laborer/summer help was found to be able to fulfill these positions so full-time
operators were utilized. The WCHA Summer Conference was also held in early June with three
Highway Committee members in attendance as well as the Commissioner.
Operations – The County and State crews have completed the first round of mowing. WisDOT
has also added additional restrictions on mowing timing for Karner Blue Butterfly, remnant
prairie, and rusty patched bumblebee which will push the 2 nd pass mowing on portions of the
state system into this Fall.
Page 17 of 62
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
The CTH D project continues to progress with all ditching and restoration completed in the first
phase. Following chipsealing, that phase will be final graded and paved. Work on the 2 nd phase
is scheduled to begin with culvert replacements and pulverizing in the next week.
In addition to mowing, state crews have been working on bridge maintenance and responding to
concrete buckles with the hotter weather.
Budget – Below is the 2026 budget analysis through June 20
th .
Winter maintenance is at 60% of the overall budget which is tracking lower than last year and is
still in the typical range for this time of year.
General maintenance is at 59% of the overall budget which is tracking approximately 10%
higher than typical. This is primarily due to the additional ice storm clean-up. Staff is working
with Emergency Management and Finance on submitting data to the Wisconsin Disaster Fund to
attempt to be reimbursed for a portion of those costs.
Construction – Through last week, the CTH D constru ction costs were under $700k which is
tracking under budget for the progress made.
Chipsealing – Through the first 3 days of chipseali ng, approximately 32 of the 49 miles were
completed and costs were tracking well within and under budget.
The Machinery Operation budget is still tracking with higher revenues resulting in a current
surplus of $242k. There is a drop which is typical in the Spring as equipment use during Spring
postings are down and there are higher shop costs for removing snow and ice equipment during
this timeframe.
Below is a summary of the net surplus/loss through the year.
January + $15k
February +$261k
March +$233k
April +$333k
May +$280k
June +$242k
The DOT Routine Maintenance Agreement is tracking within 5% of the budgeted costs for
winter and general maintenance activities. The overall budget is tracking higher as our January
invoice includes our billing for radio, storage reimbursement, and winter readiness charges.
Page 18 of 62
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
Projects
-Safe Streets for All(SS4A) Grant – No new update - Draft plans of the Bike/Ped Plan and ADA
Compliance Plan have been submitted to the Committee for their review and comments.
Additional information can be found at: https://www.co.portage.wi.gov/735/Safe-Streets-
Roads-For-All-Grant
-WisDOT Structure 6’-20’ Program – No new update - Staff has applied for funding for the
CTH E structure of the Wisconsin River as well as the CTH A structure over Spring Creek. Both
structures were rated a 3. The WisDOT has given some preliminary information on the
applications which numbered approximately 430 with almost $134M in costs with only $30M in
available funding. There were 74 applications in the 0-2 rating scale totaling nearly $25M with
another 212 applications for structures rated 3 totaling $61M.
-CTH R(STH 54 to CTH B) –The 60% plans and prelimin ary plat have been completed for the
project. The final plat and relocation order is scheduled to be on the August Committee meeting.
Construction is scheduled for 2028 for this project as part of the WisDOT STP-Urban Program.
-CTH II Bear Creek Bridge – Final design is completed and submitted to WisDOT for review.
The proposed dual culverts will be replaced with a slab span bridge which will increase the
capacity and allow us to fully remove and eliminate the two failing smaller culverts to the south.
WisDOT and WDNR have reviewed and concurred with this option . Construction is set for
2027 for this project with is part of the WisDOT STP-Bridge Program.
-CTH HH and Hoover Development – The development te am has addressed all of staff’s
comments except meeting with the Village, Town, and property owners to the south to discuss
the new access limitations on their properties due to the new intersection design. We are also
waiting on a final traffic control plan for the CTH HH work. A potential future Committee
agenda item may be adjusting our budget in 2026 or 2027 to resurface the portion of CTH HH
between Hoover Ave and I39 ramps which are not being replaced as part of the intersection
project. The intersection project will replace approximately 700’ in both directions.
-Highway Addition and Renovation – No updates. The project is still waiting final close-out and
payment to Miron as there are some HVAC issues still unresolved.
-WCHA Updates – The WCHA Summer Conference was atte nded by Supervisors Cieslewicz,
Fritz, and Potocki and Commissioner Check. In addition, County Executive Olson, Supervisor
Ladick, Commissioner Check, and County Engineer Meddaugh attended the Transportation
Development Association roundtables for transportation funding on May 20 th . There are some
Page 19 of 62
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
larger items that the Executive Committee is currently working on with the WisDOT which may
require some additional assistance from our elected officials. This includes WCHA managing
the awards of the Surface Transportation Rural projects as well as a re-write of Trans 206 which
is the language that governs the Local Road Improvement Program.
-WisDOT Surface Transportation Program 2026-2031 Cycle –No new updates. Staff has applied
for STP-Rural funding for CTH A(STH 161 to CTH Z) roadway and Local Bridge funding CTH
O bridge rehabilitation. WisDOT’s initial plan was to release project selections in the Spring but
they have delayed this notice until late Summer..
-Solid Waste/Outside Sheriff Impound Project – Work has been completed for the relocation of
the outside Sheriff’s impound area to the west and on the Highway side of the fence. Any
associated costs are charged to Solid Waste.
New Updates
-WisDOT Construction Projects – WisDOT has multiple construction projects starting this
spring. Additional information will be posted to their website:
https://projects.511wi.gov/region/north-central/
-WIS 13 (2nd Street North to County P) - Wood and Portage counties – Pavement
replacement project with full closure and detour.
-WIS 54 (26 Street to County B) - Wood and Portage counties – Concrete joint repair
project with single lane closures.
-Standing Rocks Road(Custer Rd to Townline Rd, Town of Stockton) -Reconditioning
project funded under STP-Local. Road closed to through traffic with access to the park
maintained.
- Ice Storm Recovery – Information is due to the Wisconsin Disaster Fund(WDF) on July 24
th
to determine what costs may be reimbursable.. On the county system, the ice storm clean-up
costs are approximately $380k and all work is completed.
-Wetland and Stream Mitigation Project – We are currently working with a student group
from UWSP and an Eagle Scout to complete a signing project for the site that would provide
some history and educational material for the site.
-Request for Proposals(RFP) – Engineering Services – Award letters have been sent out to the
top consultants and we are currently working on scoping projects for Town of Pine Grove bridge
aid project as well as the design for CTH T.
Page 20 of 62
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
-2027 Bridge Culvert Aid – Notices and applications to the Towns have been sent out this week
for consideration in the 2027 budget.
-McDill Dam Fence – There has been communication over the past year regarding the fence
along the McDill dam and CTH HH sidewalk in the Village of Whiting between the McDill Lake
District, City of Stevens Point, Village of Whiting, and the Highway Department. There are
sections of fence missing and others in need of repair. Based on the Highway Department’s and
Corp Counsel’s review of the past agreements, we do not believe that the fence is in the County’s
responsibility but will be setting up a meeting with all parties to resolve.
-CTH HH/Bremmer Street Intersection – Due to concerns from the increased traffic being
rerouted due to the Bus 51 project, staff has received calls from the owner and a tenant for the
office building along Bremmer Street at the McDill Pond. This intersection was analyzed
previously due to sight distance concerns and the intersection was ultimately converted to a
Right Turn only intersection. There are increased concerns with speed which staff has forwarded
onto the Sheriff’s office but will also be re-evaluating some short-term solutions for the
intersection.
-Next Meeting Date – The next regularly scheduled meeting would be August 18
th .
If you have any questions on any of the items, please feel free to call or email.
Thank you.
Attachments: None
Page 21 of 62
PORTAGE COUNTY
MEETING MINUTES
HIGHWAY COMMITTEE
PORTAGE COUNTY ANNEX
CONFERENCE ROOMS 1 & 2
1462 STRONGS AVENUE
STEVENS POINT, WI 54481
Tuesday, May 19, 2026 4:00 PM
REMOTE ATTENDANCE & COMMENT
To attend this meeting by telephone : dial 1-872-242-7813, after dialing the number you will then be asked to enter in a
meeting number. Use the following meeting number: 599 639 893, then press #
To attend this meeting by video: Join the meeting now
Page 1 of 2
CALL TO ORDER
The Highway Committee Meeting was called to order by Highway Commissioner Check at 4:00 p.m.
Members Present: Member D. Ladick, Member S. Cieslewicz, Member M. Jacowski, Member S. Potocki, Member S. Fritz
Others Attending: Nathan Check, Stacy Zerby, Lucas Meddaugh(remote), Eric Olson
1. Committee Members enter Per Diem and Mileage
ELECTION OF OFFICERS
2. Chairperson
Highway Commissioner Check asked for nominations for the Committee Chairman position.
A motion was made by Member M. Jacowski, seconded by Member S. Cieslewicz to cast a unanimous ballot and seat Supervisor D.
Ladick as Chairman. Check asked for additional nominations three times with no other nominations. Nominations for Chairman were
closed. Motion passed by voice vote.
3. Vice Chairperson
Chairman D. Ladick asked for nominations for the Committee Vice Chairman position.
A motion was made by Member M. Jacowski, seconded by Member S. Potocki to cast a unanimous ballot and seat Member S.
Cieslewicz as Vice Chairman. Chairman D. Ladick asked for additional nominations three times with no other nominations.
Nominations for Vice Chairman were closed. Motion passed by voice vote.
ESTABLISH REGULAR MEETING DATE
4. Determine the Regular Committee Meeting Date for the 2026 - 2028 Term
The Highway Committee will meet the 3rd Tuesday of every month at 3:30 p.m. prior to the County Board Meeting.
CORRESPONDENCE
5. Work Zone Awareness Week Press Release
Update Only
6. CTH D Construction Project Press Release
Update Only
PRESENTATIONS
REPORTS
7. Special Meeting Attendance Reports (Portage County Ordinance 3.1.47 & 3.1.48)
Page 22 of 62
Highway Committee Meeting Minutes May 19, 2026
Page 2 of 2
8. Commissioner's Report
Update Only
PUBLIC NOTICE
Members of the public who wish to address the Committee on specific agenda items must register their request at this time,
with such comments subject to the public comment ordinance and the reasonable control of the Committee Chair as set
forth in Robert’s Rules of Order.
APPROVAL OF MINUTES
9. Approval of April 14, 2026 Minutes
A motion was made by Vice Chair S. Cieslewicz, seconded by Member M. Jacowski to approve the minutes. Motion carried by
unanimous vote.
DISCUSSION/POSSIBLE ACTION
NEXT MEETING DATE
Tuesday, June 16, 2026 - 3:30 p.m.
ADJOURNMENT
Adjourned at 4:20 p.m.
Page 23 of 62
Portage County 800 Plover Road
Highway Department Plover, WI 54467
Nathan Check, PE Phone: 715-345-5355
Commissioner Fax: 715-345-5356
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock
Date: July 9, 2026
To: Highway Committee
From: Lucas Meddaugh, P.E.
Subject: CTH Y (CTH 66 to Dewey Drive) Speed Study Results
Introduction
A speed study on CTH Y (STH 66 to Dewey Drive), was requested to be reviewed due to
concerns of speed and accident frequency. Residents made the request through the Town of Hull.
Existing Conditions
CTH Y is a two-lane, bi-directional, north-south county highway with 2 – 12 foot lanes, 3 foot
paved shoulder and 1 foot aggregate shoulder. This collector highway has two speed limits that
are the focus of this study. From the intersection of STH 66 to 2,100ft north of Jordan Road, the
speed limit is currently 45-mph. The 55-mph speed limit begins 2,100ft north of Jordan Road
and continues beyond Dewey Drive. Dewey Drive is the indicated end point of this study.
WisDOT completed a traffic count near the northern terminus of the study area in 2021, which
indicated AADT traffic counts of 1,200 veh/day. There are two main segments within the study:
Segment #1 is a 45-mph zone, from STH 66 to a point 2,100 feet north of Jordan Road, that has
adjacent Portage County Parks (Jordan Park) land on either side, along with private residential
buildings. This is a collector segment of CTH Y that is rural with no lateral obstructions within
the clear zone or significant vertical clearance issues. There are 6 access points, with one side
street intersection at Jordan Road on the southern end of the segment. A 5-year review of the
crash history was completed and indicated one crash (exceed speed limit, failure to control,
failed to keep in designated lane) with one minor injury.
Segment #2 is a 55-mph zone from a point 2,100ft north of Jordan Road to Dewey Drive, which
contains 42 access points. Segment #2 will be split into two sub-segments. The 5-year review of
crash history is listed within each segment, as well as the adjacent land use(s). This is a collector
segment that is rural with no lateral obstructions within the clear zone or significant vertical
clearance issues. The sub-segments are denoted below:
x Segment #2.1: a point 2,100 feet north of Jordan Road to 1,200 feet north of Sharonwood
Lane. This sub-segment contains 18 access points, along with the intersection at
Sharonwood Lane. The remaining access points are for residential and agricultural use.
The 5-year crash review indicated three crashes and one non-fatal injury:
o failure to control, ran off roadway
o ran off roadway, failed to keep in designated lane, operated motor vehicle in
inattentive, careless, or erratic manner
Page 24 of 62
Portage County 800 Plover Road
Highway Department Plover, WI 54467
Nathan Check, PE Phone: 715-345-5355
Commissioner Fax: 715-345-5356
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock
o failure to control, operated motor vehicle in inattentive, careless, or erratic manner
There are current advisory speeds posted on the horizontal curves within this segment which
vary from 40-mph to 50-mph. These signs are to indicate to motorists that there are changes in
the geometry that may not be apparent or expected, and drivers need to reduce their speed. There
are two curves in this segment that have different angular dimensions and have a short
connecting straight section between them. The relative closeness with different curve designs has
created a localized area of increased crash frequency with three crashes contained within these
curves.
x Segment #2.2: a point 1,200 feet north of Sharonwood Lane to Dewey Drive. This sub-
segment contains 24 access points for residential and agricultural use. The 5-year crash
review indicated two crashes and one non-fatal injury:
o failed to yield right-of-way, improper turn
o failure to control
There are current advisory speeds posted on the horizontal curves within this segment which
vary from 45-mph to 50-mph. These signs are placed as previously mentioned above.
Speed data was collected at three locations within the study area:
x 800 feet north of Jordan Road (Segment #1)
x 2,700 feet north of Jordan Road (Segment #2.1)
x 1,220 feet north of Sharonwood Lane (Segment #2.2)
The summary of the speed observations including additional statistics, such as the percent
driving over the speed limit and percent driving more than 10 mph above the speed limit, is listed
in the following table. CTH Y segment #1 study location observed approximately 77% of the
drivers exceeding the speed limit, and 13.2% of the drivers traveling more than 10-mph above
the speed limit. The observed median and 85
th percentile speeds were ~49-mph and 55-mph,
respectively. Segment #2.1 study location observed just under 39% of the drivers exceeding the
speed limit, and slightly less than 2% of the drivers traveling more than 10-mph above the speed
limit. The observed median and 85th percentile speeds were ~53-mph and 59-mph, respectively.
Segment #2.2 study location observed just over 45.2% of the drivers exceeding the speed limit,
and almost 3% of drivers traveling more than 10-mph above the speed limit. The observed
median and 85th percentile speeds were ~54-mph and 60-mph, respectively.
This information can be seen in Table 1 below:
Page 25 of 62
Portage County 800 Plover Road
Highway Department Plover, WI 54467
Nathan Check, PE Phone: 715-345-5355
Commissioner Fax: 715-345-5356
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock
Table 1 Speed Study Results on CTH Y
Segment
Speed
Limit
Median
Speed
85th
Percentile
Speed 10-mph Pace
% Over
Speed
Limit
%>10mph
Over Speed
Limit
Segment #1 from
STH 66 to a point
2,100 ft north of
Jordan Rd
45-mph 49.0-
mph 54.6-mph 45 to 54-mph 77% 13.2%
Segment #2.1 a
point 2,100 ft
north of Jordan Rd
to 1,200 ft north of
Sharonwood Ln
55-mph 53.2-
mph 58.9-mph 50 to 59-mph 38.9% 1.8%
Segment #2.2 a
point 1,200 ft
north of
Sharonwood Ln to
Dewey Dr
55-mph 54.4-
mph 60.0-mph 51 to 60-mph 45.2% 2.7%
NCHRP 966 Speed Limit Analysis
NCHRP Research Report 966: Posted Speed Limit Setting Procedure and Tool was utilized to
perform a speed limit analysis on CTH Y. This tool was created to help set reasonable, safe, and
consistent speed limits. The NCHRP 966 tool considers all major factors to determine an
appropriate speed limit, including operating speeds (median and 85th percentile), ADT, roadway
characteristics and geometric conditions, level of development in the surrounding area, as well as
several others.
The results of the NCHRP 966 tool analysis, show a suggested speed limits for the following
segments:
x 45-mph for Segment #1: from STH 66 to a point 2,100 ft north of Jordan Rd.
x 55-mph for Segment #2.1: a point 2,100 feet north of Jordan Road to 1,200 feet north of
Sharonwood Lane
x 55-mph for Segment #2.2: a point 1,200 feet north of Sharonwood Lane to Dewey Drive
Page 26 of 62
Portage County 800 Plover Road
Highway Department Plover, WI 54467
Nathan Check, PE Phone: 715-345-5355
Commissioner Fax: 715-345-5356
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock
National tools such as the NCHRP 966 tool are effective at taking information about a highway
(e.g., observed speeds, crash history, access point density, surrounding land uses, etc.) and
objectively synthesizing that information into a suggested speed limit based on research for
setting appropriate speed limits. It is important to adapt suggested speed limits from national
tools to local conditions in Wisconsin. Typically, speed limits in Wisconsin are set within 5 mph
of the recommended speed limits from a national tool are considered rational speed limits
(Highway Safety Improvement Program (HSIP): Speed Management Improvement Project
Development Study (WisDOT ID: 0656-43-04) completed by WisDOT and TADI in 2010).
Conclusions & Recommendations
The results of the study and the NCHRP 966 tool analysis support maintaining the existing
posted speed limits along CTH Y, with the exception of Segment #2.1 where crash history and
driver behavior indicate the need for a localized speed management intervention.
For Segment #1, the tool’s recommended speed limit of 45 mph aligns with the current posted
limit. Although crash frequency in this segment is low, observed operating speeds show that the
majority of motorists are exceeding the posted limit, and more than 13% are traveling 10 mph or
more above it. The combination of elevated operating speeds and a higher pace range suggests
that additional law enforcement presence or targeted enforcement campaigns will be necessary to
reinforce driver compliance.
In Segment #2.1, the NCHRP 966 tool supports the existing 55-mph speed limit; however, the
crash history reveals a concentrated pattern of run-off-road and lane-departure crashes within the
series of closely spaced horizontal curves. The presence of multiple advisory speeds within short
succession appears to be ineffective at influencing driver behavior. Reducing the posted speed
limit in this segment would better align driver expectation with actual geometric conditions and
is likely to reduce the frequency and severity of future crashes.
For Segment #2.2, both the NCHRP 966 recommendation and the operating speed data support
maintaining the existing 55-mph posted speed limit. Crashes in this segment are low in
frequency, varied in nature, and not tied to specific geometric features. Motorists are generally
complying with the existing limit, and no additional enforcement or speed management measures
appear necessary.
Therefore, it is recommended to:
• Retain the existing 45-mph speed limit from STH 66 northward, supplemented with enhanced
enforcement to address elevated operating speeds.
• Extend the 45-mph speed limit north to a point 1,200 feet north of Sharonwood Lane to provide
a consistent and appropriate speed transition through the area of increased crash frequency and
complex horizontal alignment.
• Retain the existing 55-mph speed limit from a point 1,200 feet north of Sharonwood Lane to
Dewey Drive.
Page 27 of 62
Portage County 800 Plover Road
Highway Department Plover, WI 54467
Nathan Check, PE Phone: 715-345-5355
Commissioner Fax: 715-345-5356
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock
Note that we did receive feedback from 6 residents as part of the public outreach process and
they all support a speed reduction in the area.
If the Committee approves any changes to the speed zones, a resolution and ordinance change
will be brought to the August Committee meeting for action.
A map of the existing conditions and proposed recommendations is below.
Attachments: Public Input
Page 28 of 62
Portage County 800 Plover Road
Highway Department Plover, WI 54467
Nathan Check, PE Phone: 715-345-5355
Commissioner Fax: 715-345-5356
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock
Exhibit 1. Existing Conditions and Proposed Recommendations.
Sharonwood Lane
Jordan Park Road
Dewey Drive
Legend
45-mph Zone (Existing)
45-mph Zone (Proposed)
55-mph Zone (Existing)
55-mph Zone (Proposed)
Page 29 of 62
From: Jean Buckley
To: Meddaugh, Lucas; toenofhull@tn.hull.wi.gov
Subject: County Road Y
Date: Thursday, July 9, 2026 6:51:48 PM
Caution! This message was sent from outside your organization.
By way of introduction, this is Jean Buckley and John Thompson, of 2029 County Road Y.
I (Jean) attended the meeting last November regarding excessive speeds, unsafe curves, confusing signage AND
(not mentioned in the letters) multiple motor vehicle accidents involving damage to people and property. Just last
month our mailbox and
our neighbor (Mr. & Mrs. L. & A. Hintz’s) mailboxes were destroyed by a vehicle. That driver was not cited for
speeding However he not only damaged our mailboxes he also damaged his vehicle and The Hintz’ yard.
This issue is really danger to pedestrians, property: The speed limit of 45-55 is too high: the
accident last
month establishes that standing alone.
From Hwy 66 North until the road straightens, the speed limit should be no more than 40 miles per hour. Keeping
the speed limit the same, as your letter suggests, is both confusing “45/55mph zone” and currently clearly unsafe.
Please consider
decreased the speed limit to 40 mph.
Sincerely
Jean Buckley & John Thompson
P.S. I received your letter today July 9, 2026 please allow a longer response time, especially during these summer
months.
Sent from my iPhone
Page 30 of 62
Page 31 of 62
Page 32 of 62
Page 33 of 62
Page 34 of 62
Page 35 of 62
Page 36 of 62
Page 37 of 62
Page 38 of 62
Page 39 of 62
Page 40 of 62
Portage County 800 Plover Road
Highway Department Plover, WI 54467
Nathan Check, PE Phone: 715-345-5355
Commissioner Fax: 715-345-5356
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock
Date: June 17, 2026
To: Highway Committee
From: Lucas Meddaugh, P.E.
Subject: CTH KK (800ft south of Timberline Court to the intersection with CTH A) Speed
Study Results
Introduction
A speed study on CTH KK (800ft south of Timberline Court to the intersection with CTH A),
was requested to be reviewed for an increase in speed limit, due to apparent operating speeds
exceeding posted speed limits and low accident rate. A local resident made the request through
the Town of Amherst.
Existing Conditions
CTH KK is a two-lane, bi-directional, north-south county highway with 2 – 12 foot lanes, 3 foot
paved shoulder and 5 foot aggregate shoulder. The speed limit is currently posted as 35-mph for
this 1.6 mile segment of collector roadway. This segment of roadway was former USH 10,
designed and built in 1967 at a design speed of 70mph. Through increased traffic and updates in
design criteria, the roadway design speed was reduced to 55 mph in 1993 along with the updates
to the intersection at CTH B/Western Way and USH 10 (known now at CTH KK). The design
speed was further reduced to 35-mph through a traffic study and intersection analysis in 2009.
WisDOT completed two traffic counts on this segment of roadway in 2021. The counts indicated
AADTs of 1,100 vehicles/day just south of the intersection of CTH KK and CTH B/Western
Way and 1,500 vehicles/day near the Tomorrow River Bridge. There are 24 access points within
the study corridor; of these access points, six are commercial driveways, 11 are private
driveways, and there are seven side street intersections:
x CTH B (Western Way) / Wilson Street
x Lincoln Street
x Packer Avenue / South Main Street
x Unnamed cul-de-sac
x CTH A
There are 3 study areas in this corridor that were reviewed:
x Northern segment (800ft south of Timberline Court to CTH B / Western Way / Wilson
Street Intersection)
x Middle segment: the intersection of CTH B / Western Way / Wilson Street and CTH KK
x Southern segment, from the intersection of CTH B / Western Way / Wilson Street to the
southern Village Limits which includes a short section from the Village limits to CTH A
Page 41 of 62
Portage County 800 Plover Road
Highway Department Plover, WI 54467
Nathan Check, PE Phone: 715-345-5355
Commissioner Fax: 715-345-5356
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock
The northern collector segment (800ft south of Timberline Court to CTH B/Western Way
Intersection) is a mix of residential, commercial and agricultural use. The roadway cross section
is rural with no lateral obstructions within the clear zone or significant vertical clearance issues.
There were no crashes recorded in this segment of roadway during the 5-year review period.
The middle segment includes the intersection of CTH KK and CTH B / Western Way / Wilson
St which was redesigned and reconstructed in 2020. As part of the design, alternatives from the
2009 traffic study were reviewed. The intersection was ultimately redesigned at a 35-mph speed
which allowed an expanded site distance due to tighter widths and radii. There was one crash
recorded (failed to yield right-of-way) at the intersection during the latest 5-year review period.
The limits of this reconstructed intersection will remain at 35-mph due to the design criteria
implemented during realignment.
The southern segment is a mix of developed commercial and residential uses that falls inside and
outside of the corporate limits of the Village of Amherst. Within the Village Limits, from the
intersection of CTH B / Western Way / Wilson Street to the southern Village Limits, it would be
categorized as an “Outlying District” due to the spacing of buildings greater than 200ft in any
1,000ft segment. Although, this segment is within the Village of Amherst limits, the roadway
cross section is rural with no lateral obstructions within the clear zone or significant vertical
clearance issues. There was one crash recorded (failed to yield to right-of-way) during the 5-year
review period. The collector segment of roadway that falls outside of the Village Limits
(southern Village Limits to CTH A) is a mix of residential and agricultural use. The roadway
cross section is rural with no lateral obstructions within the clear zone or significant vertical
clearance issues. There was one crash recorded at the intersection of CTH KK and CTH A
(following too closely) within this southernmost section for the 5-year review period.
Speed data was collected along CTH KK at two locations from 6:00am, 6/2/2026 until 6:00pm,
6/4/2026:
x 1000ft north of CTH B/Western Way/Wilson St intersection
x 1200ft south of CTH B/Western Way/Wilson St intersection
The summary of the speed observations including additional statistics, such as the percent
driving over the speed limit and percent driving more than 10 mph above the speed limit, is listed
in the following table. The CTH KK northern segment study location observed approximately
93.5% of the drivers exceeding the speed limit, and 33.1% of users traveling more than 10-mph
above the speed limit. The observed median and 85
th percentile speeds were ~43-mph and ~49-
mph, respectively. The southern segment study location observed approximately 95% of the
drivers exceeding the speed limit, and 40.6% of users traveling more than 10-mph above the
Page 42 of 62
Portage County 800 Plover Road
Highway Department Plover, WI 54467
Nathan Check, PE Phone: 715-345-5355
Commissioner Fax: 715-345-5356
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock
speed limit. The observed median and 85th percentile speeds were ~44-mph and ~50-mph,
respectively. This information can be seen below:
Table 1 Speed Study Results on CTH KK
Segment
Speed
Limit
Median
Speed
85th
Percentile
Speed 10-mph Pace
% Over
Speed
Limit
%>10mph
Over Speed
Limit
800ft South of
Timberline Ct - CTH
B/Western Way/
Wilson St
35-mph 42.9-
mph 48.7-mph 39 to 48-mph 93.5% 33.1%
CTH B/Western
Way/ Wilson St -
CTH A
35-mph 44.1-
mph 50.3-mph 39 to 48-mph 95.0% 40.6%
NCHRP 966 Speed Limit Analysis
NCHRP Research Report 966: Posted Speed Limit Setting Procedure and Tool was utilized
to
perform a speed limit analysis on CTH KK. This tool was created to help set reasonable, safe,
and consistent speed limits. The NCHRP 966 tool considers all major factors to determine an
appropriate speed limit, including operating speeds (median and 85th percentile), ADT, roadway
characteristics and geometric conditions, level of development in the surrounding area, as well as
several others.
The results of the NCHRP 966 tool analysis, show a suggested speed limit for the northern
segment (from 800ft south of Timberline Court to intersection of CTH B/Western Way) on CTH
KK of 45-mph. This is a short segment of roadway (0.3miles) to be posted at 45-mph by current
Traffic Engineering, Operations, & Safety Manual (TEOpS) 13-5, Table 8.22 Minimum Length
of Road for a Speed Limit, guidelines. The recommended distance for a 45-mph speed zone
posting is 0.6 miles.
The results of the NCHRP 966 tool analysis, show a suggested speed limit for the southern
segment (from 1,020ft south of the intersection of CTH B/Western Way/Wilson Street and CTH
KK to CTH A) on CTH KK of 50-mph.
National tools such as the NCHRP 966 tool are effective at taking information about a highway
(e.g., observed speeds, crash history, access point density, surrounding land uses, etc.) and
objectively synthesizing that information into a suggested speed limit based on research for
Page 43 of 62
Portage County 800 Plover Road
Highway Department Plover, WI 54467
Nathan Check, PE Phone: 715-345-5355
Commissioner Fax: 715-345-5356
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock
setting appropriate speed limits. It is important to adapt suggested speed limits from national
tools to local conditions in Wisconsin. Typically, speed limits in Wisconsin are set within 5 mph
of the recommended speed limits from a national tool are considered rational speed limits
(Highway Safety Improvement Program (HSIP): Speed Management Improvement Project
Development Study (WisDOT ID: 0656-43-04) completed by WisDOT and TADI in 2010).
Additionally, the NCHRP Research Report 966: Posted Speed Limit Setting Procedure and Tool
shows speeds of 45-mph and 50-mph are ideal for the northern and southern segments, which are
greater than the current posted speed limit of 35-mph through these sections of CTH KK.
Conclusions & Recommendations
Although, the NCHRP 966 Tool recommends a 45-mph speed limit for the segment north of the
CTH KK/CTH B intersection to a point 800ft south of Timberline Court. It would be acceptable
to create the 45-mph zone between the existing intersection and adjusting the terminus of the 55-
mph zone to the north. This would incorporate stopping sight distance ( minimum 250 feet for a
35-mph zone) prior to the intersection. This better aligns with currently traveled speeds, as well
as adhering to minimum speed zone lengths in TEOpS 13-5, Table 8.2.
The NCHRP 966 Tool recommends a 50-mph speed limit for the segment south of the CTH
KK/CTH B intersection to CTH A. It would be acceptable to increase the speed limit from 35-
mph to 45-mph, from a point approximately 1,020 ft south of the intersection of CTH B/Western
Way to CTH A. This is indicated by the analysis of the observed speeds, which show that more
than 95% of roadway users are traveling above the posted speed limit in both sections of the
study corridor. Most drivers operate within a pace range of 39/40 to 48/49 (north/south,
respectively). Combined with the low, non-localized crash rate, (3 incidents in a 5-year period),
the results indicate that roadway users have established a natural pace speed that aligns well with
existing roadway geometry and allows them to navigate the corridor safely.
Therefore, the recommendation is:
x Adjust the 55-mph speed zone southern limit, to end at a point 480 feet north of
Timberline Court
x Establish a 45-mph speed zone from a point 480 feet north of Timberline Court to a point
575 feet north of the CTH B / Western Way / Wilson Street Intersection
x Retain the existing 35-mph zone through the intersection with CTH B /Western Way /
Wilson Street
x Establish a 45-mph zone from a point beginning 1,020ft south of the intersection with
CTH B /Western Way / Wilson Street to the intersection with CTH A
Note that we did receive feedback from 6 residents as part of the public outreach process and
those comments are attached.
Page 44 of 62
Portage County 800 Plover Road
Highway Department Plover, WI 54467
Nathan Check, PE Phone: 715-345-5355
Commissioner Fax: 715-345-5356
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock
Please see the map below for an overview of the existing conditions and recommendations.
If the Committee approves any changes to the speed zones, a resolution and ordinance change
will be brought to the August Committee meeting for action.
Attachments: Public Feedback
Page 45 of 62
Portage County 800 Plover Road
Highway Department Plover, WI 54467
Nathan Check, PE Phone: 715-345-5355
Commissioner Fax: 715-345-5356
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock
Exhibit 1. Existing Conditions and Proposed Recommendations.
Legend
35-mph Zone (Existing)
35-mph Zone (Proposed)
45-mph Zone (Proposed)
55-mph Zone (Existing)
55-mph Zone (Proposed)
Timberline Court
CTH A
Page 46 of 62
From: Victor Voss
To: Meddaugh, Lucas
Subject: Hwy KK, speed study
Date: Tuesday, June 30, 2026 11:13:43 AM
Warning! This message was sent from outside your organization and we were unable to verify the sender.
Thanks for the notice of the possible speed limit change on Hwy KK between Timberline Ct.
and Hwy A/B.
I agree with the reduction in speed through the Hwy KK/Western Way/Wilson Street
intersection. This is still a very active intersection and could be studied further, possibly with a
roundabout or 4-way stop.
As Hwy KK was designed for higher speed traffic, I don't believe the roadway itself would
cause any concerns; there are also limited driveways on the proposed 45 MPH section, the
intersection with Hwy KK/Packer Ave/S. Main Street is a concern. We use this route of travel
for emergency vehicles responding into the Village and elsewhere due to the low underpasses
on Wilson and Lincoln Streets. With an increase in speed there, additional tree trimming might
be necessary.
I also have some concerns about the traffic in and out of the newly opened Tomorrow River
Supper Club, but again, this used to be Hwy 10.
So in summary, I really don't have any major concerns. But if conditions change- more
driveways, opening of Lincoln Street, etc. the speed should be reevaluated then.
ON a separate note: has there been any consideration by the county to lower the speed limit on
Hwy B on the east side of the village between the village limits and Washington St./Hwy V?
This is currently posted at 45 MPH, and traffic is moving much faster than that. The roadway
now is the east border of the village with McKinley Street, Mill Street, Red Tail Dr, and
Washington Street all intersecting with it. There is increased pedestrian traffic as there are no
sidewalks or paths. I think this needs to be addressed or at least considered for a reduction in
speed, 35 MPH? It also carries a lot of traffic.
Thanks, have a great weekend
Victor Voss, EFO
Fire Chief / Service Director
Amherst Fire District
715-824-2699 (office)
715-340-3098 (cell)
"Everything admin does is the thrust that reaches the end of the hose line, the blade of the
axe, and the tip of the ladder."
Page 47 of 62
From: Jodi Patoka
To: Meddaugh, Lucas
Subject: Proposed speed limit increase on CTY KK
Date: Tuesday, July 7, 2026 8:49:36 AM
Caution! This message was sent from outside your organization.
To: Portage County Highway Committee
From: Dave Crubaugh, Village of Amherst President
Re: Proposed speed limit increase on CTY KK
In 2023, Steve Cieslewicz approached the Village of Amherst Board to request a speed
study of this segment of CTY KK. The Village’s portion of KK is approximately 1.18 miles,
or about 75% of this segment of road. By increasing the speed from 35 mph to 55 mph,
this will decrease the driver’s commute by only 44 seconds. An increase to 45 mph
would have no significant difference to commute time.
Village residents that live near the intersection of KK, Packer Ave, and South Main St.
have expressed concerns crossing this intersection at the current speeds. Raising the
speed limit would significantly increase the risk crossing here.
At the Village Board’s June 13, 2023 meeting, the Board unanimously voted to deny the
speed study so that speed would not be adjusted.
The property adjacent to KK in the village is zoned general business, single, and
multifamily residential. This segment of the Village is one of the few areas for potential
expansion, especially for homes. A speed increase would make conditions potentially
dangerous for future driveways.
As the municipality with the majority of properties along the corridor, our hope is that our
concerns would be given primary consideration.
Convenience should never outweigh safety concerns.
Thanks for consideration of our concerns.
Jodi Patoka on behalf of Dave Crubaugh, Village President
Clerk/Treasurer
Village of Amherst
160 Mill St., P.O. Box 36
Amherst, WI 54406
Phone: (715) 824-5613
Fax: (715) 824-5713
Page 48 of 62
Page 49 of 62
Page 50 of 62
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
Date: July 14, 2026
To: Highway Committee
From: Nathan Check, P.E.
Subject: Discussion and Possible Action on Rumble Strip Installation on CTH N east of CTH
BB, Town of Buena Vista
Background:
Please see the attached email from a resident requesting rumble strips on CTH N at the
intersection with CTH BB in the Town of Buena Vista. The Highway Department has also
received a call from another resident with a similar request due to a fatality in May of 2026.
The accident report did verify that the driver did stop at the stop sign on CTH N but proceeded
westward as they did not see a motorcycle traveling south. Both the email and caller stated that
they have witnessed multiple near-misses at the intersection due to vehicles not stopping.
For past requests, rumble strip requests have been reviewed by the Committee with staff
analysis. While they have proven effective for additional warning for stop controlled
intersections, they typically would only be used for areas with accident history, geometric
concerns, or other reasons as they may have an impact on surrounding properties.
The intersection is an unlit rural 4-way intersection with stop control on CTH N on the east side
and Bluff Road on the west side. The Highway Department reviewed the sight distance along
CTH N for both the Stop Ahead and Stop sign and found them to well exceed the 55 mph speed
limit. One item to note is that there is a slight vertical crest curve before the intersection. While
the stop sign is visible from over 600’ away, the s ign is visible at the bottom of the vision profile
which is not a typical location where drivers may identify it.
The sight distance along CTH BB was also reviewed and found to exceed the requirements in
both directions.
The nearest home on the east side of the intersection is approximately 250’ away at 6539 CTH N
and appears to be inhabitable. There is also a shed and a grain storage facility located on the east
side of the intersection. On the west side, there are two homes located between 500’ to 600’
from the intersection with the next nearest residence over 1,100’ away. The nearest homes south
and north of the intersection are also over 1,000’ away.
An overview of the area is below with an approximate ¼ mile radius shown. As part of the
rumble strip request process, the Department sends out the attached letter to any properties
within ¼ mile of the intersection.
Page 51 of 62
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
/uni0050/uni006F/uni0072/uni0074/uni0061/uni0067/uni0065/uni0020/uni0043/uni006F/uni0075/uni006E/uni0074/uni0079
/uni0048/uni0069/uni0067/uni0068/uni0077/uni0061/uni0079/uni0020/uni0044/uni0065/uni0070/uni0061/uni0072/uni0074/uni006D/uni0065/uni006E/uni0074
/uni004E/uni0061/uni0074/uni0068/uni0061/uni006E/uni0020/uni0043/uni0068/uni0065/uni0063/uni006B/uni002C/uni0020/uni0050/uni0045
/uni0043/uni006F/uni006D/uni006D/uni0069/uni0073/uni0073/uni0069/uni006F/uni006E/uni0065/uni0072
/uni0038/uni0030/uni0030/uni0020/uni0050/uni006C/uni006F/uni0076/uni0065/uni0072/uni0020/uni0052/uni006F/uni0061/uni0064
/uni0050/uni006C/uni006F/uni0076/uni0065/uni0072/uni002C/uni0020/uni0057/uni0049/uni0020/uni0035/uni0034/uni0034/uni0036/uni0037
/uni0050/uni0068/uni006F/uni006E/uni0065/uni003A/uni0020/uni0037/uni0031/uni0035/uni002D/uni0033/uni0034/uni0035/uni002D/uni0035/uni0033/uni0035/uni0035
/uni0046/uni0061/uni0078/uni003A/uni0037/uni0031/uni0035 /uni002D/uni0033/uni0034/uni0035 /uni002D/uni0035/uni0033/uni0035/uni0036
Analysis:
In addition to the intersection geometry and sight distance, the accident history is also reviewed.
For WisDOT highways, they typically would only install rumble strips to reinforce the presence
of the stop sign if the intersection experienced 2 failure to stop crashes in a 12 month period or 3
such crashes in a 5 year period. The 3 failure to stop crashes within a 5 year period is also
consistent with Federal Highway Administration’s recommendation.
Page 52 of 62
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
The Highway Department has reviewed the intersection crash history for the past 5 years.
Overall, the intersection has a low crash history with two non-deer related crashes over this time.
One accident was the fatal accident due to looking but not seeing and the second was a sideswipe
at the intersection with a northbound to eastbound turning vehicle that hit a vehicle stopped at the
intersection. Staff further reviewed the accident history for a total of 10 years and found one
additional accident in 2018. This accident was a result of a westbound vehicle failing to stop at
the stop sign. The driver of the unit claimed to have looked before entering the intersection but
did not see a southbound vehicle.
The Department understands that near-misses are not accounted for in the recorded crash history
and two local residents have stated that they have experienced other near misses.
Fiscal Impact:
The Highway Department’s General Maintenance budget has adequate funds to cover the rumble
strip installation if approved.
Recommendation:
While the intersection crash history does not meet the WisDOT or FHWA crash history
warrants, staff recommends that the Committee consider the request for this specific area with
input from the surrounding residents. Staff has received one phone call for the nearest house
west of the intersection who has stated that they support the rumble strips.
Rumble strips were added to the CTH N and CTH J intersection immediately east of this
intersection in 2017 after a failure to stop which resulted in a fatality. Drivers may have an
expectation of additional notice for the stop condition due to the adjacent intersection.
In lieu of rumble strips, additional measures can be implemented at the intersection which could
include increasing the stop sign size and adding flags to the stop ahead and/or stop signs. The
additional flags would also increase the conspicuity of the stop sign.
Attachments: Email Request
Property Owner Letter
Page 53 of 62
1
Check, Nathan
From: Check, Nathan
Sent: Wednesday, May 6, 2026 6:40 AM
To: 'Heather.Stroik@sentry.com'
Cc: Meddaugh, Lucas; Johnson, David
Subject: RE: Intersection of Cty Rd N & Cty Rd BB
Good morning Heather,
Thank you for reaching out regarding your concerns at the CTH N and BB intersection. Our Department
/uni0077i/uni006C/uni006C /uni0062e /uni0077orking /uni0077ith the /uni0053heri/g431/uni2019s O/g431ice on a fu/uni006C/uni006C re/uni0076ie/uni0077 of the intersection /uni0077hich /uni0077i/uni006C/uni006C /uni006Cook at the accident
history, geometry, and signage. The re/uni0076ie/uni0077 /uni0077i/uni006C/uni006C a/uni006Cso inc/uni006Cude consideration of other safety measures such
as additiona/uni006C signs or other impro/uni0076ements such as rum/uni0062/uni006Ce strips. I /uni0077i/uni006C/uni006C /uni0062e in touch after /uni0077e comp/uni006Cete
our re/uni0076ie/uni0077. If you ha/uni0076e any questions in the meantime, p/uni006Cease fee/uni006C free to ca/uni006C/uni006C or emai/uni006C.
Take care,
Nathan
Nathan Check, PE
Highway Commissioner
800 Plover Road
Plover, WI 54467
checkn @co.portage.wi.gov
Phone: 715-345-5230
Cell: 715-630-2203
Fax: 715-345-5356
From: Stroik Heather < Heather.Stroik@sentry.com >
Sent: Tuesday, May 5, 2026 9:22 AM
To: Highway Department < Highway@co.portage.wi.gov >
Cc: Stroik Heather < Heather.Stroik@sentry.com >
Subject: Intersection of Cty Rd N & Cty Rd BB
Good morning,
I’m sending this email regarding the intersection of Cty Rd N & Cty Rd BB in Portage County, WI. My family
/uniflfl5-hus/uniflflY5and & young children/uniflfl53 li/uniflfl7Ye on Blu/gAJ1 Road in Buena /uniflfl!Yista.
We sadly came upon the accident at the intersection
of Cty Rd BB & Blu/gAJ1 Road on /uniflfl!Junday morning. We came upon it within a few minutes of it happening and /uniflflY5efore
law enforcement or medical emergency had arri/uniflfl7Yed. It’s something I pray we ne/uniflfl7Yer ha/uniflfl7Ye to witness again. Now
each time we lea/uniflfl7Ye our home/uniflflJB we must stop at the stop sign on Blu/gAJ1 Rd & Cty Rd BB and /uniflflY5e reminded of the
accident /uniflflY5y the flowers /uniflflY5y the stop sign.
We tra/uniflfl7Yel this intersection multiple times a day.
/uniflfl!Je/uniflfl7Yeral times coming West on Cty Rd N. O/uniflfl7Yer the last 11 years we
ha/uniflfl7Ye li/uniflfl7Yed on Blu/gAJ1 Road, I ha/uniflfl7Ye seen se/uniflfl7Yeral times, accidents almost happen. /uniflfl!Ahere is a /uniflflY5lind spot when you are
on Cty Rd N going West and at the stop sign. Within the last 5 years, there was another fatal accident on Cty Rd N
& Cty Rd J that resulted in a fatality. /uniflfl!Ahey added rum/uniflflY5le strips in the road /uniflflY5ut ne/uniflfl7Yer added them to the intersection
of the recent accident.
I’m asking out of concern and safety of other dri/uniflfl7Yers and my family that something /uniflflY5e done at this intersection.
May/uniflflY5e add rum/uniflflY5le strips, add a flashing stop sign. Anything! I do not want another family to ha/uniflfl7Ye to go through
Page 54 of 62
2
what the families are going through from the recent accident, and I don’t want my young children, hus/uniflflY5and, and
myself to witness this again.
You may contact me at 715-340-8464 or /uniflflY5y email.
/uniflfl!Ahank you for reading this and taking my concerns into consideration.
Heather /uniflfl!Jtroik
6455 Blu/gAJ1 Rd
Bancroft, WI 54921
/uniflfl!Ahis e-mail is confidential. If you are not the intended recipient, you must not disclose or use the
information contained in it. If you ha/uniflfl7Ye recei/uniflfl7Yed this e-mail in error, please tell us immediately /uniflflY5y return
e-mail and delete the document. No recipient may use the information in this e-mail in /uniflfl7Yiolation of any
ci/uniflfl7Yil or criminal statute. We disclaim all lia/uniflflY5ility for any unauthorized uses of this e-mail or its contents,
and accept no lia/uniflflY5ility or responsi/uniflflY5ility for any damage caused /uniflflY5y any /uniflfl7Yirus transmitted with this e-mail.
/uniflfl!Ao learn more a/uniflflY5out our pri/uniflfl7Yacy policy, please /uniflfl7Yisit sentry.com/pri/uniflfl7Yacy.
Page 55 of 62
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
June 18, 2026
Re: Rumble Strip Request for CTH N and CTH BB intersection, Town of Buena Vista
Dear Property Owner,
The Portage County Highway Department has received requests to install rumble strips on the
westbound approaches of CTH N at the CTH BB intersection in the Town of Buena Vista. The
requests are driven from the recent fatal crash as well as reports of many near-misses by local
residents in the area.
In coordination with the Sheriff’s office, the Highway Department has reviewed the intersection
crash history over the past 10 years. Overall, the intersection has a low crash history with 3 non-
deer related crashes over this 10 year period. A brief accident history is below:
• May 2026 – Westbound vehicle stopped at the stop si gn but then proceeded into
the intersection while not seeing a southbound motorcycle.
• December 2024 – Northbound vehicle turning east ont o CTH N slid into a vehicle
stopped at the stop sign.
• November 2018 – Westbound vehicle failed to stop at the stop sign and struck a
southbound vehicle. The westbound vehicle claimed to have looked before
entering the intersection but did not see the other vehicle.
The Department understands that near-misses are not accounted for in the recorded crash history,
and we will be reviewing other characteristics of the intersection such as the geometry and sight
distances. In addition, the next step of the Department’s review process is to gather local input
from near-by residents. Rumble strips have been proven to reduce intersection crashes, but one
of the pitfalls is noise disturbance for near-by residents.
The Portage County Highway Committee will be discussing this topic at their next meeting held
at 3:30 pm, Tuesday, July 21
st at the Portage County Annex Building , 1462 Strongs Avenue,
Stevens Point, WI. We encourage residents to attend to provide input in regards to this issue. If
you are not able to make the meeting, we also encourage any feedback through phone,
mail, or email. Please feel free to contact me directly at 715-345-5230 or
checkn@co.portage.wi.gov .
If the rumble strips are approved by the Highway Committee, we would anticipate installation
later this year. In the meantime, the Department is also considering increasing the stop sign size
and adding flags as other measures to improve safety at the intersection.
Page 56 of 62
County Engineer – Lucas Meddaugh
Co
unty Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
/uni0050/uni006F/uni0072/uni0074/uni0061/uni0067/uni0065/uni0020/uni0043/uni006F/uni0075/uni006E/uni0074/uni0079
/uni0048/uni0069/uni0067/uni0068/uni0077/uni0061/uni0079/uni0020/uni0044/uni0065/uni0070/uni0061/uni0072/uni0074/uni006D/uni0065/uni006E/uni0074
/uni004E/uni0061/uni0074/uni0068/uni0061/uni006E/uni0020/uni0043/uni0068/uni0065/uni0063/uni006B/uni002C/uni0020/uni0050/uni0045
/uni0043/uni006F
/uni006D/uni006D/uni0069/uni0073/uni0073/uni0069/uni006F/uni006E/uni0065/uni0072
/uni0038/uni0030/uni0030/uni0020/uni0050/uni006C/uni006F/uni0076/uni0065/uni0072/uni0020/uni0052/uni006F/uni0061/uni0064
/uni0050/uni006C/uni006F/uni0076/uni0065/uni0072/uni002C/uni0020/uni0057/uni0049/uni0020/uni0035/uni0034/uni0034/uni0036/uni0037
/uni0050/uni0068/uni006F/uni006E/uni0065/uni003A/uni0020/uni0037/uni0031/uni0035/uni002D/uni0033/uni0034/uni0035/uni002D/uni0035/uni0033/uni0035/uni0035
/uni0046/uni0061/uni0078/uni003A/uni0037/uni0031/uni0035/uni002D/uni0033/uni0034/uni0035/uni002D/uni0035/uni0033/uni0035/uni0036
Regards,
Nathan Check, P.E.
checkn@co.portage.wi.gov
Intersection Map
Page 57 of 62
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
Date: July 14, 2026
To: Highway Committee
From: Nathan Check, P.E.
Subject: Discussion and Possible Action on CTH E(CTH HH – Da m Road) Project Budget
Amendment Request
Background:
As part of the Highway Department’s Capital Improvement Plan, CTH E from CTH HH to Dam
Road was originally planned for a mill and overlay in 2027.
Analysis:
This project is proposed to be accelerated to 2026 for the following reasons.
1. The roadway surface is deteriorating at a faster rate requiring additional maintenance and
safety concerns.
2. The CTH E structure over the Wisconsin River is within this section of roadway and the
Department has applied for funding through the Wisconsin Department of Transportation
for replacement in 2027. This would require a full closure, and it would be difficult and
more expensive to attempt to complete both projects in the same year due to trucking
issues with the bridge closure.
3. There are adequate resources to complete the project this year after the completion of the
CTH D project.
Fiscal Impact:
There are adequate funds in the Vehicle Registration Fee fund to complete this project in 2026.
Recommendation:
Staff recommends that the Committee consider and approve the budget amendment request.
Attachments: Budget Amendment/Transfer Request Form
Page 58 of 62
County of Portage
Finance Department
Budget Amendment/Transfer
Request Form
Policy #: TBD
Effective: September 21, 2025
Department: HIGHWAY DEPARTMENT Fiscal Year: 2026
Submitted By: Stacy Zerby Date Submitted:
Type: Check one Description: CTH E (CTH HH – DAM RD) PROJECT County Board Date:
☐
☐
☐
☐
☐
☐
☐
☒
☐
Transfer within appropriation – account to account (Department Director)
Transfer due to technical correction – tracking or accounting purposes (Finance Director)
Transfer up to 10% of original appropriation (Finance Committee)
Transfer over 10% of original appropriation (County Board)
Transfer between two or more departments (County Board)
Increase in appropriation with grant revenue – new grant or increased funding (County Board)
Increase in appropriation with contingency funds (County Board)
Increase in appropriation with offsetting revenue or existing fund balance (County Board)
Increase in appropriation with General Fund (County Board)
Justification for Budget Amendment/Transfer: Fiscal Impact: $680,095
As part of the Highway Department’s Capital Improvement Plan, CTH E from CTH HH to Dam Road was originally planned for a mill and overlay in 2027. This
project is proposed to be accelerated to 2026 for the following reasons.
1. The roadway surface is deteriorating at a faster rate requiring additional maintenance and safety concerns.
2. The CTH E structure over the Wisconsin River is within this section of roadway and the Department has applied for funding through the Wisconsin
Department of Transportation for replacement in 2027. This would require a full closure, and it would be difficult and more expensive to attempt
to complete both projects in the same year.
There are adequate funds in the Vehicle Registration Fee fund to complete this project in 2026.
Attachments
Department Head Nathan Check
AUTHORIZATION
Finance Staff
Recommendation Approval documented in EERP System
County Executive Approval documented in EERP System
Governing Committee Action: Approval documented in EERP System Meeting Date: 7/21/26
Finance Committee Action: Approval documented in EERP System Meeting Date:
Financial Action
Increase Decrease Fund Name/Account Description Account Number Requested Amount
☒
☐
Enterprise – Construction – Contract
Enterprise – Paving - Contract
61317030-52100
61317040-52100
$140,000
$510,000
☒
☐
Enterprise - CTHS Local Highway Revenue
Enterprise – Local-Highway-Nonhighway Activities
61317000-47430
61000000-47492
$650,000
$30,095
☒
☐
Enterprise – Designated for future use 61310000-59100 $30,095
☒
☐
Special Revenue - CTH System charges 21317000-52395 $680,095
☒
☐
Special Revenue - Fund Balance Applied (Wheel Tax) 21317000-49300 $680,095
Finance
Director
Initials
Comments:
Page 59 of 62
/uni0043/uni006F/uni0075/uni006E/uni0074/uni0079 /uni0045/uni006E/uni0067/uni0069/uni006E/uni0065/uni0065/uni0072 /uni2013 /uni004C/uni0075/uni0063/uni0061/uni0073 /uni004D/uni0065/uni0064/uni0064/uni0061/uni0075/uni0067/uni0068
/uni0043/uni006F/uni0075/uni006E/uni0074/uni0079 /uni0050/uni0061/uni0074/uni0072/uni006F/uni006C /uni004D/uni0061/uni006E/uni0061/uni0067/uni0065/uni0072 /uni2013 /uni004B/uni006F/uni0072/uni0079 /uni004B/uni0075/uni006B/uni0075/uni0063/uni007A/uni006B/uni0061 /uni0053/uni0074/uni0061/uni0074/uni0065 /uni0050/uni0061/uni0074/uni0072/uni006F/uni006C /uni004D/uni0061/uni006E/uni0061/uni0067/uni0065/uni0072 /uni2013 /uni0044/uni0061/uni0076/uni0069/uni0064 /uni004A/uni006F/uni0068/uni006E/uni0073/uni006F/uni006E
/uni0050/uni0061/uni0072/uni0074/uni0073 /uni0052/uni006F/uni006F/uni006D /uni002F /uni0053/uni0068/uni006F/uni0070 /uni004D/uni0061/uni006E/uni0061/uni0067/uni0065/uni0072 /uni2013 /uni0043/uni006F/uni0072/uni0065/uni0079 /uni0047/uni0069/uni0065/uni0073/uni0065 /uni0041/uni0073/uni0073/uni0069/uni0073/uni0074/uni0061/uni006E/uni0074 /uni0050/uni0061/uni0074/uni0072/uni006F/uni006C /uni004D/uni0061/uni006E/uni0061/uni0067/uni0065/uni0072 /uni2013 /uni0042/uni006F/uni0062 /uni004C/uni0061/uni006E/uni0067
/uni0046/uni0069/uni006E/uni0061/uni006E/uni0063/uni0065 /uni004F/g431/uni0069/uni0063/uni0065 /uni0053/uni0075/uni0070/uni0065/uni0072/uni0076/uni0069/uni0073/uni006F/uni0072 /uni2013 /uni0053/uni0074/uni0061/uni0063/uni0079 /uni005A/uni0065/uni0072/uni0062/uni0079 /uni0046/uni0069/uni006E/uni0061/uni006E/uni0063/uni0069/uni0061/uni006C /uni0041/uni0073/uni0073/uni006F/uni0063/uni0069/uni0061/uni0074/uni0065 /uni0049/uni0049/uni0049 /uni2013 /uni004B/uni0072/uni0069/uni0073/uni0074/uni0065/uni006E /uni0048/uni0061/uni006E/uni0063/uni006F/uni0063/uni006B
/uni0050/uni006F/uni0072/uni0074/uni0061/uni0067/uni0065/uni0020/uni0043/uni006F/uni0075/uni006E/uni0074/uni0079
/uni0048/uni0069/uni0067/uni0068/uni0077/uni0061/uni0079/uni0020/uni0044/uni0065/uni0070/uni0061/uni0072/uni0074/uni006D/uni0065/uni006E/uni0074
/uni004E/uni0061/uni0074/uni0068/uni0061/uni006E/uni0020/uni0043/uni0068/uni0065/uni0063/uni006B/uni002C/uni0020/uni0050/uni0045
/uni0043/uni006F/uni006D/uni006D/uni0069/uni0073/uni0073/uni0069/uni006F/uni006E/uni0065/uni0072
/uni0038/uni0030/uni0030/uni0020/uni0050/uni006C/uni006F/uni0076/uni0065/uni0072/uni0020/uni0052/uni006F/uni0061/uni0064
/uni0050/uni006C/uni006F/uni0076/uni0065/uni0072/uni002C/uni0020/uni0057/uni0049/uni0020/uni0035/uni0034/uni0034/uni0036/uni0037
/uni0050/uni0068/uni006F/uni006E/uni0065/uni003A/uni0020/uni0037/uni0031/uni0035/uni002D/uni0033/uni0034/uni0035/uni002D/uni0035/uni0033/uni0035/uni0035
/uni0046/uni0061/uni0078/uni003A/uni0037/uni0031/uni0035 /uni002D/uni0033/uni0034/uni0035 /uni002D/uni0035/uni0033/uni0035/uni0036
Date: July 16, 2026
To: Highway Committee
From: Nathan Check, P.E.
Subject: Discussion and Possible Action on Contract with TerraVentures Advisors, LLC for
Professional Real Estate Services for CTH R Project
Background:
Highway staff had worked with the Purchasing Department to issue a Request for
Proposals(RFP) for real estate acquisition services for future roadway projects which include
CTH R and T. The services include appraisals, negotiations, acquisition services, and
maintenance of project files in accordance with Wisconsin Statutes and Administration Codes as
well as the WisDOT Real Estate Program Manual.
Analysis:
Four proposals were received with TerraVenture Advisors, LLC rated as the highest proposal.
Staff has worked with TerraVenture on developing a scope, negotiating a price, and setting the
schedule for the CTH R project. The project will consist of 13 properties with a mix of Fee and
Temporary Limited Easements plus 9 utility release of rights. As is past projects, a sales study
will be completed to provide the initial offering prices. At this time, no appraisals are anticipated
but property owners may request one based on state statute.
Fiscal Impact:
The pricing for the contract is below.
The estimated cost of the contract is $25,450. If appraisals are requested, this cost will be
charged at the per unit price.
The 2026 Highway Department budget included approximately $346,000 of total Highway
design project funds to cover any design and real estate services. As reported previously to the
Committee, the local costs for the CTH R project will be covered by the Village of Plover per the
Memorandum of Understanding(MOU) and Jurisdictional Transfer Agreement(JTA) for the
Page 60 of 62
/uni0043/uni006F/uni0075/uni006E/uni0074/uni0079 /uni0045/uni006E/uni0067/uni0069/uni006E/uni0065/uni0065/uni0072 /uni2013 /uni004C/uni0075/uni0063/uni0061/uni0073 /uni004D/uni0065/uni0064/uni0064/uni0061/uni0075/uni0067/uni0068
/uni0043/uni006F/uni0075/uni006E/uni0074/uni0079 /uni0050/uni0061/uni0074/uni0072/uni006F/uni006C /uni004D/uni0061/uni006E/uni0061/uni0067/uni0065/uni0072 /uni2013 /uni004B/uni006F/uni0072/uni0079 /uni004B/uni0075/uni006B/uni0075/uni0063/uni007A/uni006B/uni0061 /uni0053/uni0074/uni0061/uni0074/uni0065 /uni0050/uni0061/uni0074/uni0072/uni006F/uni006C /uni004D/uni0061/uni006E/uni0061/uni0067/uni0065/uni0072 /uni2013 /uni0044/uni0061/uni0076/uni0069/uni0064 /uni004A/uni006F/uni0068/uni006E/uni0073/uni006F/uni006E
/uni0050/uni0061/uni0072/uni0074/uni0073 /uni0052/uni006F/uni006F/uni006D /uni002F /uni0053/uni0068/uni006F/uni0070 /uni004D/uni0061/uni006E/uni0061/uni0067/uni0065/uni0072 /uni2013 /uni0043/uni006F/uni0072/uni0065/uni0079 /uni0047/uni0069/uni0065/uni0073/uni0065 /uni0041/uni0073/uni0073/uni0069/uni0073/uni0074/uni0061/uni006E/uni0074 /uni0050/uni0061/uni0074/uni0072/uni006F/uni006C /uni004D/uni0061/uni006E/uni0061/uni0067/uni0065/uni0072 /uni2013 /uni0042/uni006F/uni0062 /uni004C/uni0061/uni006E/uni0067
/uni0046/uni0069/uni006E/uni0061/uni006E/uni0063/uni0065 /uni004F/g431/uni0069/uni0063/uni0065 /uni0053/uni0075/uni0070/uni0065/uni0072/uni0076/uni0069/uni0073/uni006F/uni0072 /uni2013 /uni0053/uni0074/uni0061/uni0063/uni0079 /uni005A/uni0065/uni0072/uni0062/uni0079 /uni0046/uni0069/uni006E/uni0061/uni006E/uni0063/uni0069/uni0061/uni006C /uni0041/uni0073/uni0073/uni006F/uni0063/uni0069/uni0061/uni0074/uni0065 /uni0049/uni0049/uni0049 /uni2013 /uni004B/uni0072/uni0069/uni0073/uni0074/uni0065/uni006E /uni0048/uni0061/uni006E/uni0063/uni006F/uni0063/uni006B
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
CTH R corridor. These costs will be billed back to the Village upon the County receiving the
invoicing.
Recommendation:
Staff recommends approval of the award to TerraVenture Advisors, LLC.
The final plat and relocation order will be brought to the Committee at the August meeting for
consideration.
Attachments: None
Page 61 of 62
Portage County 800 Plover Road
Highway Department Plover, WI 54467
Nathan Check, PE Phone: 715-345-5355
Commissioner Fax: 715-345-5356
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patr ol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assista nt Patrol Manager – Bob Lang
Finance Office Supervisor – Stacy Zerby Financia l Associate III – Kristen Hancock
Date: July 14, 2026
To: Highway Committee
From: Nathan Check, P.E.
Subject: Discussion and Possible Action on 2026 Equipment Purchase – Underbody Plows
Background:
The purchase of three 2027 truck chassis were approved by the Committee at the February
meeting. Two of the chassis will now need to be outfitted with snow and ice equipment.
Typically, the underbody plows were included in the snow and ice equipment bid but beginning
in 2023, we began experiencing supply, delivery, and service issues. This resulted in us
researching other options.
Analysis:
The most advantageous option has been a Minnesota DOT contract pricing through Universal
Truck Equipment for a total price of $40,210 including freight for two underbodies. For
comparison, our cost last year was $39,096.
Fiscal Impact:
The two plow chassis and their equipment will be included in next year’s Machinery budget but
it is prudent to lock these prices in now as the MN state contract extension will likely see an
increase in the new year.
Recommendation:
Staff recommends that the Committee approve the purchase of 2 underbody plows from
Universal Truck Equipment. They have provided the underbodies the last three years with no
issues.