RecordWell Data

Highway Committee — Agenda Packet

Town of Grant · Portage County · Highway Committee · meeting of Jul 21, 2026 · Agenda packets

Open the original document More from Town of Grant

This document is no longer listed on Town of Grant's website. We kept the copy we read.

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

PORTAGE COUNTY MEETING AGENDA HIGHWAY COMMITTEE PORTAGE COUNTY ANNEX CONFERENCE ROOMS 1 & 2 1462 STRONGS AVENUE STEVENS POINT, WI 54481 Tuesday, July 21, 2026 3:30 PM REMOTE ATTENDANCE & COMMENT To attend this meeting by telephone : dial 1-872-242-7813, after dialing the number you will then be asked to enter in a meeting number. Use the following meeting number: 694 554 049, then press # To attend this meeting by video: Join the meeting now Page 1 of 2 CALL TO ORDER Committee Members enter Per Diem and Mileage CORRESPONDENCE 1. National Association of Counties Transportation Funding Brief 2. US Army Corp of Engineers Stream Credit Release Letter PRESENTATIONS REPORTS 3. Special Meeting Attendance Reports (Portage County Ordinance 3.1.47 & 3.1.48) 4. Commissioner’s Report PUBLIC NOTICE Members of the public who wish to address the Committee on specific agenda items must register their request at this time, with such comments subject to the public comment ordinance and the reasonable control of the Committee Chair as set forth in Robert’s Rules of Order. APPROVAL OF MINUTES 5. Approval of May 19, 2026 Minutes DISCUSSION/POSSIBLE ACTION 6. Discussion and Possible Action on CTH Y(STH 66 to Dewey Drive) Preliminary Speed Study Results 7. Discussion and Possible Action on CTH KK(Timberline Road to CTH A) Preliminary Speed Study Results 8. Discussion and Possible Action on Rumble Strip Installation on CTH N east of CTH BB, Town of Buena Vista 9. Discussion and Possible Action on CTH E(CTH HH – Dam Road) Project Budget Amendment Request 10. Discussion and Possible Action on Contract with Terra Ventures for Professional Real Estate Services for CTH R Project 11. Discussion and Possible Action on 2027 Equipment Purchase – Underbody Plows NEXT MEETING DATE ADJOURNMENT Page 1 of 62 Highway Committee Meeting Agenda July 21, 2026 Page 2 of 2 Notice: Any person who has special needs and plans on attending this meeting in-person or remotely should contact the Facilities at 715- 346-1598 as soon as possible to ensure that reasonable accommodations can be made. Notice: Remote comment by the public during the meeting will be at the discretion of the Chair. Notice: A quorum of the Portage County Board of Supervisors, or any committee thereof, may be present at this meeting. Page 2 of 62 Bridging the Gap for Surface Transportation: Why Counties Need a Stronger Federal Investment Partnership Page 3 of 62 2 | Bridging the Gap for Surface Transportation: Why Counties Need a Stronger Federal Investment Partnership Surface Transportation Reauthorization Is Critical for the Nation’s Infrastructure America’s surface transportation system connects our communities and powers the national economy, yet its roads face a $684 billion funding gap over the next decade.¹ Counties own and maintain 44% of public roads and 38% of bridges, infrastructure essential not only for daily travel but also for economic competitiveness, national security and quality of life. As supply chains grow more complex and freight movement increases, our roads are carrying more traffic and heavier loads than ever before. Yet as demands grow and construction costs skyrocket, this locally owned infrastructure is deteriorating rapidly. Despite the central role counties play in transportation, we remain structurally disadvantaged in accessing infrastructure funding. Although counties own 28% of federal-aid highway miles, states direct only about 14% of transportation funding to local governments overall, including counties, cities and towns.² Counties also face disadvantages in purchasing materials and competing for labor, as states often benefit from larger federal subsidies and purchasing power. Overall, just 6.2% of total local government revenue comes directly from the federal government.³ This imbalance is worsening as infrastructure needs outpace available revenue and construction costs continue to rise. Nearly 40% of major U.S. roads are in poor or mediocre condition, 4 and over 40,000 bridges are structurally deficient. 5 Driving on deteriorated, congested roads costs the average driver more than $1,400 annually in vehicle operating costs and lost time,6 while inadequate roadway safety contributes to at least one-third of fatal crashes. 7 Counties cannot address this challenge alone. In 40 states, counties face significant state-imposed fiscal constraints that limit our ability to raise revenue when state and federal funding falls short.8 Congress must act to restore balance and ensure counties have the resources to keep America moving safely and efficiently. NACo’s Ask: Counties Cannot Close the Gap Alone A modern, balanced and reliable federal investment strategy is essential to ensure safe travel, economic stability and long-term resilience. Congress must provide counties with the necessary tools and resources: Increase federal investment in county- owned roads and bridges — counties maintain nearly half of America’s public roads but receive only a small share of federal formula transportation funding. Congress must increase the share of formula funds available for local use from 15% to 25%. Simplify and accelerate access to federal grants — discretionary grants are vital, but administrative burdens limit their effectiveness. Congress should preserve these programs while making them easier to apply for and implement. Improve planning and project delivery — counties often rely on metropolitan planning organizations (MPOs) and rural/regional transportation planning organizations (RTPOs) to implement federal dollars. Congress must strengthen planning and project selection to ensure that counties can access intended funding. Page 4 of 62 Bridging the Gap for Surface Transportation: Why Counties Need a Stronger Federal Investment Partnership | 3 By the Numbers Counties need federal support to help close the nation’s $684 billion roadway funding gap. Counties Own and Maintain: 44% of public road miles – over 1.8 million miles 28% of the 1.03 million federal-aid highway road miles 38% of all U.S. bridges – 229,334 in total Infrastructure Conditions and Safety Risks are Worsening Funding Has Not Kept Pace With County Responsibilities Nearly 40% of roads are in poor or mediocre condition Over 40,000 bridges are structurally deficient 40,990 traffic fatalities in 2023 (47% on rural roads), up 24% over the past decade Counties own 28% of federal- aid highway miles, but only 14% of state-controlled transportation funding is directed to local governments Page 5 of 62 4 | Bridging the Gap for Surface Transportation: Why Counties Need a Stronger Federal Investment Partnership America’s Surface Transportation Infrastructure Is Deteriorating and Unsafe Roads and bridges across the nation are at a breaking point: nearly 40% of roads nationwide are in poor or mediocre condition, 9 reflecting years of underinvestment. The condition of locally owned infrastructure is even more concerning, as local governments receive far less federal support than state-owned systems, resulting in consistently worse conditions. About half (49%) of locally owned principal arterial roads, America’s major roadways, are in poor condition, compared to just 7% of similar state-owned roads. 10 Nearly 50% of locally-owned principal arterial roads are in poor condition, compared to just 7% of state-owned roads. The struggling condition of America’s locally owned infrastructure has real consequences for the economy. Closed bridges and deteriorating roads lead to detours and delays that slow supply chains and create escalating impacts across industries. Failing infrastructure also imposes real costs on everyday drivers, causing an estimated $167 billion a year — or $725 per driver on average — in additional repairs, accelerated vehicle depreciation and increased fuel consumption and tire wear.11 America’s deteriorating roads and bridges are not just an economic inconvenience; they are a safety crisis. Each day, there are 168.5 million crossings on more than 42,000 bridges rated in poor condition.12 Around 40,000 people die annually on U.S. roads, with inadequate roadway safety features contributing to roughly one- third of fatal crashes. 13 These concerns are especially acute in rural areas, which account for 47% of traffic fatalities despite being home to only 19% of Americans.14 Together, these figures make clear that infrastructure improvements are essential not only to lower costs for American workers and businesses but also to protect lives nationwide. Locally Owned Roads and Bridges are in Worse Condition Than State Infrastructure Percent of Infrastructure in Poor Condition, by Ownership Source: NACo Analysis of U.S. Department of Transportation - Federal Highway Administration, National Bridge Inventory (2025) and Brookings Institution analysis of FHWA roadway data. Bridges 4% 9% 7% 49% Principal Arterial Roads State Local Page 6 of 62 Bridging the Gap for Surface Transportation: Why Counties Need a Stronger Federal Investment Partnership | 5 County Infrastructure Supports Daily Life and Powers the American Economy Counties are an essential link in America’s transportation network, owning over 1.8 million miles of roads, more than any other level of government, and more than 229,000 of the nation’s bridges. 15 Reliable transportation infrastructure is the foundation of American economic life — connecting communities, enabling emergency response and sustaining the supply chains, industries and daily activities on which growth and competitiveness depend. County-owned roads and bridges are at the center of this network, carrying freight, supporting agriculture and manufacturing and connecting workers to jobs. Nearly 63 million jobs in key industries like tourism, retail sales, agriculture and manufacturing are completely dependent on the nation’s transportation network. 16 County-owned infrastructure also supports emerging industries critical to national competitiveness, including energy development, AI data infrastructure, advanced manufacturing and agricultural production. As these sectors grow, reliable roads and bridges are essential to connect rural communities, production sites and national markets. Counties invest $60.2 billion annually in transportation and $146 billion in infrastructure overall,17 yet local governments receive only about 14% of transportation funding distributed by states. As a result, counties often rely on municipal bonds and limited local fuel taxes to fund critical projects. With state and local municipal bond debt now totaling $4.4 trillion, 18 much of America’s infrastructure is financed through debt rather than sustained federal investment. Counties will continue investing to keep people and goods moving safely, but stronger federal partnership and increased investment are essential to maintain and modernize America’s transportation system. Counties own more public road miles than any other level of government. Source: U.S. Department of Transportation - Federal Highway Administration, 2023 Highway Performance and 2024 National Bridge Inventory Counties Own and Maintain a Significant Portion of America’s Roads and Bridges Ownership of Road Miles and Bridges within America’s Counties 4.13M total road miles 609,737 total bridges 44% 30% 20% 6% 38% 12% 48%  Owned by counties  Owned by other local governments  Owned by state agencies  Owned by other agencies Page 7 of 62 6 | Bridging the Gap for Surface Transportation: Why Counties Need a Stronger Federal Investment Partnership Costs are Rising and Straining County Budgets The increasing use of transportation infrastructure, combined with growing vehicle sizes and weights, is placing significant strain on our transportation system, especially in counties. Meanwhile, the cost of maintenance and repair is increasing dramatically. Rising construction costs are a central and growing pressure on the infrastructure funding equation. Maintaining infrastructure is now substantially more expensive than it was a decade ago due to rapid price increases across the construction sector. Between February 2020 and late 2023, overall construction input prices rose by nearly 40%, driven by higher costs for concrete and diesel fuel used to operate heavy machinery and inflation. 19 More specifically, highway Source: NACo Analysis of the Federal Highway Administration’s National Highway Construction Cost Index (NHCCI) and Highway Statistics Series Local Government Funding for Highways (Table LGF-2) Rising Highway Construction Costs are Outpacing Federal Investment in Local Roads Highway Construction Costs vs. Federal Payments to Local Governments for Highways, 2003–2023 (Indexed to 2003) 2003 1.0 Year National Highway Construction Costs Index Local Government Funding for Highways, Payments from Federal Government Index (2003 = 1.00)1.5 2.0 2.5 3.0 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 In Washington County, Iowa, the cost per mile of a road paving project nearly doubled ($495,919 to $893,191) between 2018 and 2026. 22 construction costs have increased by about 73% since 2021.20 Diesel fuel prices have also surged multiple times, remaining over $3 per gallon since the start of the COVID-19 pandemic. 21 Page 8 of 62 Bridging the Gap for Surface Transportation: Why Counties Need a Stronger Federal Investment Partnership | 7 “Aging infrastructure systems are increasingly vulnerable to natural disasters and extreme weather events, creating unexpected and often avoidable risks to public safety and disrupting economic activity, ultimately hampering U.S. global competitiveness. ” - American Society of Civil Engineers 28 These rising costs are further compounded by structural disadvantages local governments face relative to states in purchasing materials and accessing labor. 23 State departments of transportation, which receive the vast majority of federal funding,24 have larger project pipelines, more dedicated engineering staff and greater flexibility to secure materials and labor at scale. Conversely, smaller and rural counties face greater cost pressures and steeper administrative burdens in delivering infrastructure projects, 25 even as counties collectively maintain 44% of the nation’s public road miles. Addressing these structural disadvantages requires more direct federal investment in locally owned infrastructure. In addition, in July of 2025, Americans traveled more vehicle miles in one month than ever before, over 297 billion miles total. The weight of vehicles is growing, too: in 2025 alone, at least three states enacted legislation to raise maximum truck weights for specific goods on non-federal highways, and many additional states either already allow exceptions to the federal 80,000-pound limit or have introduced legislation to do so.26 These changes are meant to increase economic competitiveness between states and with our neighboring countries; however, heavier trucks will continue to damage roads, reduce our transportation capacity and, ultimately, undermine our economic strength unless our infrastructure investment keeps pace. The increased adoption of electric vehicles has also expedited this trend, as they weigh more than their internal combustion engine (ICE) counterparts.27 Heavier vehicles cause more frequent and destructive wear on already deteriorating infrastructure, and as they become more frequent and roads continue to age, maintenance costs are increasing. As county infrastructure responsibilities grow and maintenance costs rise, consistent federal investment in local governments is essential — a trend that has not materialized over the past two decades. Reliable funding, efficient grant access and strong federal, state and local partnerships will help counties maintain safe roads, support communities and strengthen local economies. Page 9 of 62 8 | Bridging the Gap for Surface Transportation: Why Counties Need a Stronger Federal Investment Partnership Federal Funding and State Constraints Limit County Investment Counties are responsible for maintaining nearly half of the nation’s public road miles and a significant share of its bridges, yet the transportation funding system does not reflect this reality. Most federal transportation dollars are distributed to states, leaving counties dependent on state-level decisions to access critical infrastructure funding. Local governments receive, on average, only about 14% of transportation funding distributed by states, despite owning and maintaining 75% of public roads. 29 As a result, counties are expected to maintain a substantial share of the nation’s transportation infrastructure without direct access to a proportional share of transportation funding. This imbalance is driven in part by the structure of federal transportation programs. Federal formula funding does not provide direct, guaranteed investments to county governments for locally owned roads and bridges. Instead, more than 90% of federal transportation funds flow via formula to state departments of transportation, requiring counties to rely on state- level suballocations or compete for a limited share of discretionary funding. 30 Some argue that counties and other local governments should have limited access to federal funding because federal funds should be limited to infrastructure with an immediate federal nexus. However, this argument fails to account for the fact that local governments own 43% of federal-aid highway miles, with counties in particular accounting for 28%. 31 Despite this responsibility, local governments receive a disproportionately small share of transportation funding distributed by states. 32 As federal transportation revenues stagnate and construction costs rise, the gap between available funding and infrastructure needs continues to widen, leaving fewer resources for states to invest in local infrastructure and support counties. As a result, the real value of federal transportation investments has declined, and despite recent increases in nominal funding, the inflation-adjusted purchasing power of federal transportation funding remains below historical levels. 33 This imbalance extends beyond transportation funding. In FY 2022, federal funding accounted for just 6.2% of total local government revenue, compared to 36.1% for states, leaving counties far more reliant on limited local revenue sources to meet growing service, infrastructure and operational demands. 34 “Just a few short years ago in Converse County we could rebuild and pave a road for a million a mile. Our last project was just over $1.7M a mile. How do we keep our roads in good shape with rising costs and flat revenue?” - Commissioner, Converse County, Wyo. Page 10 of 62 Bridging the Gap for Surface Transportation: Why Counties Need a Stronger Federal Investment Partnership | 9 As infrastructure costs continue to rise, local governments receive a far smaller share of federal funding than states, limiting their ability to keep pace with growing transportation needs. Counties also lack the authority to generate sufficient revenue to close this gap. State laws define the scope of county fiscal authority, including the types of taxes counties can levy, the amount of revenue they can raise, and the rate at which it can grow.35 Forty states across the nation impose significant limits on county revenue authority including caps on property tax rates, restrictions on sales taxes and limitations on revenue growth.36 At the same time, counties are required to deliver a wide range of services mandated by state and federal governments, often without adequate funding. 37 As a result, counties must operate within both federal funding constraints and state-imposed fiscal limits, even as local responsibilities continue to expand. Taken together, these dynamics create a structural mismatch between responsibility and resources. Counties are expected to maintain and improve critical infrastructure systems but face both limited federal investment and restricted fiscal flexibility at the state level. In all, the nation faces a $684 billion funding gap for roads over the next decade. 38 As costs continue to rise, counties are left with difficult choices: delay projects, defer maintenance or shift more costs to local taxpayers. Without a stronger, more direct federal partnership, infrastructure will continue to fall behind as transportation needs grow, costs rise and safety risks intensify. Federal funding makes up just 6% of local government revenue, compared to 36% for states. Local governments receive a significantly smaller share of federal funding than states, despite their central role in delivering infrastructure and other critical services. Source: Adapted from Dilger, R. J. Congressional Research Service, Federal Grants to State and Local Governments: Trends and Issues (R40638), June 26, 2025. https://www.congress.gov/crs-product/R40638 Local Governments Receive a Much Smaller Share of Federal Funding Than States Federal Funds to State and Local Governments, FY2022 Federal Governments$146.3 billion in FY2022 $662.3 billion in FY2022 28.2% of total local government revenue $1.112 trillion in FY2022 36.1% of total state government revenue 6.2% of total local government revenue Local State Page 11 of 62 10 | Bridging the Gap for Surface Transportation: Why Counties Need a Stronger Federal Investment Partnership Bottom Line Counties are responsible for maintaining much of the transportation systems that keep America moving, but the current transportation funding structure does not match those responsibilities. The combination of rising construction costs, state-imposed fiscal constraints and growing infrastructure demands has created a widening gap between what counties are expected to maintain and what they have the resources to sustain. Congress has the opportunity to address this situation in the upcoming surface transportation reauthorization bill, which will set federal funding levels for transportation programs for the next five years and enact policy changes on how those funds are spent. Without a stronger federal partnership, county-owned infrastructure will continue to fall behind as costs rise, safety risks grow and infrastructure needs compound. A modern, balanced and reliable federal investment strategy, one that reflects the position of county governments in maintaining the nation’s transportation network, is essential to ensure safe travel, economic stability and long-term resilience. Scan the QR code to view Surface Transportation Stats by County County of Santa Clara, County Roads Team Ensures Safety and Efficiency for Motorists, Youtube Page 12 of 62 Bridging the Gap for Surface Transportation: Why Counties Need a Stronger Federal Investment Partnership | 11 Endnotes 1 American Society of Civil Engineers. (2025). 2025 infrastructure report card: A comprehensive assessment of America’s infrastructure. 2 Tomer, A. and Ben Swedberg (2024, November 12). Connecting the DOTs: A survey of state transportation planning, investment, and accountability practices. 3 Even when federal funds passed through states are included, local governments remain chronically underfunded relative to their infrastructure responsibilities. Levin, A. G. (2025, June 26). Federal grants to state and local governments: Trends and issues (CRS Report No. R40638). Congressional Research Service. 4 American Society of Civil Engineers. (2025). 2025 infrastructure report card: A comprehensive assessment of America’s infrastructure. ASCE. 5 NACo Analysis of U.S. Department of Transportation - Federal Highway Administration, 2024 National Bridge Inventory. 6 Munoz, SJ (2025, March 26). American Society of Civil Engineers releases infrastructure report card. 7 National Transportation Research Group. (2026, April). Key facts about the U.S. surface transportation system. 8 Harris, J., & Zmuda, T. (2025, February). The County Landscape Project: County government taxes and revenues. National Association of Counties. 9 American Society of Civil Engineers. (2025). 2025 infrastructure report card: A comprehensive assessment of America’s infrastructure. 10 Tomer, A. and Ben Swedberg (2025, April 24). Highway Shakedown: How local road users are subsidizing state highway investments. 11 Consumer Reports (2026, March 23). As Crumbling Roads Increase Costs for American Drivers, Consumer Reports Looks at Fair, Effective Ways to Fund Transportation. 12 American Road & Transportation Builders Association (2024). ARTBA Bridge Report, 13 In 2023, the exact number was 40,990. In 2025, the number decreased slightly to 36,640. While this number has been steadily declining since 2022, overall traffic deaths have not returned to pre-pandemic levels. Source: National Center for Statistics and Analysis (2024, April). Early estimate of motor vehicle traffic fatalities in 2023 (Traffic Safety Facts Crash. Stats Brief Statistical Summary. Report No. DOT HS 813 561). National Highway Traffic Safety Administration. 14 U.S. Department of Transportation (2025, March 17). The Critical Role of Rural Communities in the U.S. Transportation System. 15 NACo Analysis of U.S. Department of Transportation - Federal Highway Administration, 2023 Highway Performance and 2025 National Bridge Inventory. 16 National Asphalt Pavement Association (2020, April). Key Facts about the U.S. Surface Transportation System. 17 NACo Analysis of U.S. Census Bureau - 2022 Census of Individual Governments: Finance. 18 SIFMA (2026, April 1). US Municipal Bonds Statistics. 19 Warnock, T. (2024, December 30). The cost of these 5 construction materials grew the most in 2023. Machinery Partner. 20 Federal Highway Administration, (2024, September 30). National Highway Construction Cost Index (NHCCI). 21 U.S. Energy Information Administration, (2026, May 1). US Diesel Sales Price [GASDESW], retrieved from FRED, Federal Reserve Bank of St. Louis. 22 National Association of County Engineers (2026). 23 Aoun, J., & Goldsmith, S. (2021, November 16). Modernizing American infrastructure requires people and procurement, not just dollars. Brookings Institution. 24 National Association of Counties (NACo). The Bipartisan Infrastructure Law: Examining Investments in County Infrastructure — Analyzing FY 2022 Federal Competitive Transportation Awards. 25 Wessel, D. (2024, August 7). Why does building and maintaining highways in the US cost so much? Brookings Institution. 26 Goble, K. (2025, July 14). States adopt truck weight rule changes, extension. 27 Wessel, D. (2024, August 7). Why does building and maintaining highways in the US cost so much? Brookings Institution. 28 American Society of Civil Engineers (2025). ASCE Report Card Gives U.S. Infrastructure Highest-Ever ‘C’ Grade, Stresses Need for Sustained Investment to Support Economic Growth. 29 NACo Analysis of the U.S. Department of Transportation - Federal Highway Administration, 2023 Highway Performance data. 30 National Association of Counties (NACo). The Bipartisan Infrastructure Law: Examining Investments in County Infrastructure — Analyzing FY 2022 Federal Competitive Transportation Awards. 31 A federal-aid highway is any public road that is part of the Federal-Aid Highway System, meaning it is eligible to receive federal funding for construction, maintenance and improvement. These highways are not limited to the interstate system; they include a wide range of roads that serve national, regional and local transportation needs. 32 Tomer, A. and Ben Swedberg (2024, November 12). Connecting the DOTs: A survey of state transportation planning, investment, and accountability practices. 33 Federal highway funding increased significantly in nominal terms under the Infrastructure Investment and Jobs Act; however, inflation has eroded much of this growth, leaving inflation- adjusted funding levels below those of the mid-2000s.; Lohman, A. E. (2026, February 5). Surface transportation reauthorization: Federal highway programs (CRS Report No. R48845, Version 4). Congressional Research Service. 34 Levin, A. G. (2025, June 26). Federal grants to state and local governments: Trends and issues (CRS Report No. R40638). Congressional Research Service. 35 Harris, J., & Zmuda, T. (2025, February). The County Landscape Project: County government taxes and revenues. National Association of Counties. 36 Ibid. 37 Ibid. 38 American Society of Civil Engineers. (2025). 2025 infrastructure report card: A comprehensive assessment of America’s infrastructure. ASCE. Page 13 of 62 May 2026 660 North Capitol Street NW Suite 400 | Washington, D.C. 20001 202-393-6226 | www.NACo.org @NACoCounties Page 14 of 62 DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, ST. PAUL DISTRICT 332 MINNESOTA STREET, SUITE E1500 ST. PAUL, MN 55101-1323 June 23, 2026 Electronic copy furnished: Nichole Deweese, EPA - Region 5 Chelsey Lundeen, Wisconsin DNR Leslie Day, COE Jon Gumtow, Merjent Regulatory File No. MVP-2021-00685-EMN Portage County Highway Department c/o Nathan Check 800 Plover Road Plover, Wisconsin 54467 Dear Mr. Check: This letter is in response to your request for the release of 25% (Year 1) of the stream credits from the Little Plover River Mitigation Bank located in Portage County, Wisconsin. Based on your submittal of the 2025 monitoring report, a site visit on June 9, 2026, and comments from the Interagency Review Team, we approve the release of 328.5 functional feet (FF) of stream credits from your bank in accordance with the credit release schedule on pages 5-8 of the MBI. The amount and type of credit approved for release are summarized in the attached table. Please note that we recommend you collect monitoring data on the “percent riffles” for Monitoring Reach 1 and 2 this growing season as discussed during our June 9, 2026 site visit. It appears that there are more riffles than what was documented in the 2025 monitoring report, but this information would be useful to determine if any corrective actions are needed prior to full SQT monitoring in 2027. In addition, it appeared that some of the woody material used in the stream is not large enough to count as large woody debris as defined in the SQT. You may want to consider adding larger wood to the stream to meet this metric in the future and provide in- stream habitat for macroinvertebrates and fish to aid your biology scores. According to our records, we have released a total of 7.18 federal wetland credits and 591.3 FF stream credits for your sale to permittees needing to satisfy compensatory mitigation requirements for Department of the Army permits. We track Federally approved credits in the Corps’ Regulatory In-lieu Fee and Bank Information Tracking System (RIBITS) and have updated the RIBITS ledger for your bank to reflect the credit release approved by this letter. If you have any questions, please contact me in our Stevens Point office at (651) 290-5879 or eric.m.norton@usace.army.mil. In any correspondence or inquiries, please refer to the Regulatory file number shown above. Sincerely, Eric Norton Project Manager Enclosure: Credit Release Tables Page 15 of 62 2026 CREDIT RELEASE TABLES LITTLE PLOVER RIVER MITIGATION BANK Type of Compensation # of Acres Type of Wetland Credit Credit Ratio Final Projected Credits 10% MBI Approval Credit Release Aug 2025 10% As- Built Credit Release Aug 2025 Total Credits Released to Date Re-establishment 18.08 Wet Meadow 1:1 18.08 1.81 1.81 3.62 Re-establishment (ERA) 5.60 Wet Meadow 0.5:1 2.80 0.28 0.28 0.56 Re-establishment (RCA) 0.25 Wet Meadow 0.5:1 0.13 0.01 0.01 0.02 Rehabilitation I 2.50 Wet Meadow 1:1 2.50 0.25 0.25 0.50 Rehabilitation I (ERA) 0.85 Wet Meadow 0.5:1 0.43 0.04 0.04 0.08 Rehabilitation II 3.13 Hardwood Swamp 0.75:1 2.35 0.24 0.24 0.48 Enhancement 1.82 Hardwood Swamp 0.33:1 0.60 0.06 0.06 0.12 Upland Buffer (may not contribute to more than 25% total bank credits) 39.96 Wet Meadow 0.25:1 (8.96 credits) 7.85 0.79 0.79 1.58 Hardwood Swamp 1.11 0.11 0.11 0.22 Total 68.56 35.85 3.59 3.59 7.18 Credit Release Event (date approved) Functional Feet Cumulative Functional Feet Released to Date First Release: Executed MBI, FA, CE (8/2025) 10% 131.4 131.4 Second Release: As- built (8/2025) 10% 131.4 262.8 Third Release: Performance/Year 1 (June 2026) 25% 328.5 591.3 Total 591.3 Total stream credits released: 591.3 FF Page 16 of 62 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang /uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock Portage County Highway Department Nathan Check, PE Commissioner 800 Plover Road Plover, WI 54467 Phone: 715-345-5355 Fax:715 -345 -5356 Date: July 16, 2026 To: Highway Committee From: Nathan Check, P.E. Subject: Commissioner’s Report Please see below for a number of Highway Department Updates. Staffing – Our new County Surveyor Tony Dallman sta rted on May 26 th and will be introduced at the meeting. He will also be attending the July 27 th Portage County Unity Wisconsin Towns Association Meeting to be introduced to that group as well. All other full-time positions are filled. Updates are below for the seasonal positions: -Civil Technician – It has been a struggle getting candidates to apply. The first candidate was offered the position but was not able to get a valid driver’s license. An offer was extended to a second qualified candidate but he declined due to the seasonal nature of the position. Another candidate was interviewed this week but will be returning full-time to school this Fall. We are looking at possible part-time hours through the Fall with this candidate. Seasonal Laborers – Only two of five positions were filled with one employee only working 120 hours before not showing back up to work. The other candidate recently took a full-time position with the City. He is working Tuesday through Friday with the City and has been returning to work for us on Mondays still. Summer Help – Six of six positions have been filled . The inability to fill these positions is estimated to leave over 4,000 work hours unused. Training – All tractor/mower operators have completed the in ternal training and testing. Only one seasonal laborer/summer help was found to be able to fulfill these positions so full-time operators were utilized. The WCHA Summer Conference was also held in early June with three Highway Committee members in attendance as well as the Commissioner. Operations – The County and State crews have completed the first round of mowing. WisDOT has also added additional restrictions on mowing timing for Karner Blue Butterfly, remnant prairie, and rusty patched bumblebee which will push the 2 nd pass mowing on portions of the state system into this Fall. Page 17 of 62 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang /uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock Portage County Highway Department Nathan Check, PE Commissioner 800 Plover Road Plover, WI 54467 Phone: 715-345-5355 Fax:715 -345 -5356 The CTH D project continues to progress with all ditching and restoration completed in the first phase. Following chipsealing, that phase will be final graded and paved. Work on the 2 nd phase is scheduled to begin with culvert replacements and pulverizing in the next week. In addition to mowing, state crews have been working on bridge maintenance and responding to concrete buckles with the hotter weather. Budget – Below is the 2026 budget analysis through June 20 th . Winter maintenance is at 60% of the overall budget which is tracking lower than last year and is still in the typical range for this time of year. General maintenance is at 59% of the overall budget which is tracking approximately 10% higher than typical. This is primarily due to the additional ice storm clean-up. Staff is working with Emergency Management and Finance on submitting data to the Wisconsin Disaster Fund to attempt to be reimbursed for a portion of those costs. Construction – Through last week, the CTH D constru ction costs were under $700k which is tracking under budget for the progress made. Chipsealing – Through the first 3 days of chipseali ng, approximately 32 of the 49 miles were completed and costs were tracking well within and under budget. The Machinery Operation budget is still tracking with higher revenues resulting in a current surplus of $242k. There is a drop which is typical in the Spring as equipment use during Spring postings are down and there are higher shop costs for removing snow and ice equipment during this timeframe. Below is a summary of the net surplus/loss through the year. January + $15k February +$261k March +$233k April +$333k May +$280k June +$242k The DOT Routine Maintenance Agreement is tracking within 5% of the budgeted costs for winter and general maintenance activities. The overall budget is tracking higher as our January invoice includes our billing for radio, storage reimbursement, and winter readiness charges. Page 18 of 62 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang /uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock Portage County Highway Department Nathan Check, PE Commissioner 800 Plover Road Plover, WI 54467 Phone: 715-345-5355 Fax:715 -345 -5356 Projects -Safe Streets for All(SS4A) Grant – No new update - Draft plans of the Bike/Ped Plan and ADA Compliance Plan have been submitted to the Committee for their review and comments. Additional information can be found at: https://www.co.portage.wi.gov/735/Safe-Streets- Roads-For-All-Grant -WisDOT Structure 6’-20’ Program – No new update - Staff has applied for funding for the CTH E structure of the Wisconsin River as well as the CTH A structure over Spring Creek. Both structures were rated a 3. The WisDOT has given some preliminary information on the applications which numbered approximately 430 with almost $134M in costs with only $30M in available funding. There were 74 applications in the 0-2 rating scale totaling nearly $25M with another 212 applications for structures rated 3 totaling $61M. -CTH R(STH 54 to CTH B) –The 60% plans and prelimin ary plat have been completed for the project. The final plat and relocation order is scheduled to be on the August Committee meeting. Construction is scheduled for 2028 for this project as part of the WisDOT STP-Urban Program. -CTH II Bear Creek Bridge – Final design is completed and submitted to WisDOT for review. The proposed dual culverts will be replaced with a slab span bridge which will increase the capacity and allow us to fully remove and eliminate the two failing smaller culverts to the south. WisDOT and WDNR have reviewed and concurred with this option . Construction is set for 2027 for this project with is part of the WisDOT STP-Bridge Program. -CTH HH and Hoover Development – The development te am has addressed all of staff’s comments except meeting with the Village, Town, and property owners to the south to discuss the new access limitations on their properties due to the new intersection design. We are also waiting on a final traffic control plan for the CTH HH work. A potential future Committee agenda item may be adjusting our budget in 2026 or 2027 to resurface the portion of CTH HH between Hoover Ave and I39 ramps which are not being replaced as part of the intersection project. The intersection project will replace approximately 700’ in both directions. -Highway Addition and Renovation – No updates. The project is still waiting final close-out and payment to Miron as there are some HVAC issues still unresolved. -WCHA Updates – The WCHA Summer Conference was atte nded by Supervisors Cieslewicz, Fritz, and Potocki and Commissioner Check. In addition, County Executive Olson, Supervisor Ladick, Commissioner Check, and County Engineer Meddaugh attended the Transportation Development Association roundtables for transportation funding on May 20 th . There are some Page 19 of 62 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang /uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock Portage County Highway Department Nathan Check, PE Commissioner 800 Plover Road Plover, WI 54467 Phone: 715-345-5355 Fax:715 -345 -5356 larger items that the Executive Committee is currently working on with the WisDOT which may require some additional assistance from our elected officials. This includes WCHA managing the awards of the Surface Transportation Rural projects as well as a re-write of Trans 206 which is the language that governs the Local Road Improvement Program. -WisDOT Surface Transportation Program 2026-2031 Cycle –No new updates. Staff has applied for STP-Rural funding for CTH A(STH 161 to CTH Z) roadway and Local Bridge funding CTH O bridge rehabilitation. WisDOT’s initial plan was to release project selections in the Spring but they have delayed this notice until late Summer.. -Solid Waste/Outside Sheriff Impound Project – Work has been completed for the relocation of the outside Sheriff’s impound area to the west and on the Highway side of the fence. Any associated costs are charged to Solid Waste. New Updates -WisDOT Construction Projects – WisDOT has multiple construction projects starting this spring. Additional information will be posted to their website: https://projects.511wi.gov/region/north-central/ -WIS 13 (2nd Street North to County P) - Wood and Portage counties – Pavement replacement project with full closure and detour. -WIS 54 (26 Street to County B) - Wood and Portage counties – Concrete joint repair project with single lane closures. -Standing Rocks Road(Custer Rd to Townline Rd, Town of Stockton) -Reconditioning project funded under STP-Local. Road closed to through traffic with access to the park maintained. - Ice Storm Recovery – Information is due to the Wisconsin Disaster Fund(WDF) on July 24 th to determine what costs may be reimbursable.. On the county system, the ice storm clean-up costs are approximately $380k and all work is completed. -Wetland and Stream Mitigation Project – We are currently working with a student group from UWSP and an Eagle Scout to complete a signing project for the site that would provide some history and educational material for the site. -Request for Proposals(RFP) – Engineering Services – Award letters have been sent out to the top consultants and we are currently working on scoping projects for Town of Pine Grove bridge aid project as well as the design for CTH T. Page 20 of 62 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang /uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock Portage County Highway Department Nathan Check, PE Commissioner 800 Plover Road Plover, WI 54467 Phone: 715-345-5355 Fax:715 -345 -5356 -2027 Bridge Culvert Aid – Notices and applications to the Towns have been sent out this week for consideration in the 2027 budget. -McDill Dam Fence – There has been communication over the past year regarding the fence along the McDill dam and CTH HH sidewalk in the Village of Whiting between the McDill Lake District, City of Stevens Point, Village of Whiting, and the Highway Department. There are sections of fence missing and others in need of repair. Based on the Highway Department’s and Corp Counsel’s review of the past agreements, we do not believe that the fence is in the County’s responsibility but will be setting up a meeting with all parties to resolve. -CTH HH/Bremmer Street Intersection – Due to concerns from the increased traffic being rerouted due to the Bus 51 project, staff has received calls from the owner and a tenant for the office building along Bremmer Street at the McDill Pond. This intersection was analyzed previously due to sight distance concerns and the intersection was ultimately converted to a Right Turn only intersection. There are increased concerns with speed which staff has forwarded onto the Sheriff’s office but will also be re-evaluating some short-term solutions for the intersection. -Next Meeting Date – The next regularly scheduled meeting would be August 18 th . If you have any questions on any of the items, please feel free to call or email. Thank you. Attachments: None Page 21 of 62 PORTAGE COUNTY MEETING MINUTES HIGHWAY COMMITTEE PORTAGE COUNTY ANNEX CONFERENCE ROOMS 1 & 2 1462 STRONGS AVENUE STEVENS POINT, WI 54481 Tuesday, May 19, 2026 4:00 PM REMOTE ATTENDANCE & COMMENT To attend this meeting by telephone : dial 1-872-242-7813, after dialing the number you will then be asked to enter in a meeting number. Use the following meeting number: 599 639 893, then press # To attend this meeting by video: Join the meeting now Page 1 of 2 CALL TO ORDER The Highway Committee Meeting was called to order by Highway Commissioner Check at 4:00 p.m. Members Present: Member D. Ladick, Member S. Cieslewicz, Member M. Jacowski, Member S. Potocki, Member S. Fritz Others Attending: Nathan Check, Stacy Zerby, Lucas Meddaugh(remote), Eric Olson 1. Committee Members enter Per Diem and Mileage ELECTION OF OFFICERS 2. Chairperson Highway Commissioner Check asked for nominations for the Committee Chairman position. A motion was made by Member M. Jacowski, seconded by Member S. Cieslewicz to cast a unanimous ballot and seat Supervisor D. Ladick as Chairman. Check asked for additional nominations three times with no other nominations. Nominations for Chairman were closed. Motion passed by voice vote. 3. Vice Chairperson Chairman D. Ladick asked for nominations for the Committee Vice Chairman position. A motion was made by Member M. Jacowski, seconded by Member S. Potocki to cast a unanimous ballot and seat Member S. Cieslewicz as Vice Chairman. Chairman D. Ladick asked for additional nominations three times with no other nominations. Nominations for Vice Chairman were closed. Motion passed by voice vote. ESTABLISH REGULAR MEETING DATE 4. Determine the Regular Committee Meeting Date for the 2026 - 2028 Term The Highway Committee will meet the 3rd Tuesday of every month at 3:30 p.m. prior to the County Board Meeting. CORRESPONDENCE 5. Work Zone Awareness Week Press Release Update Only 6. CTH D Construction Project Press Release Update Only PRESENTATIONS REPORTS 7. Special Meeting Attendance Reports (Portage County Ordinance 3.1.47 & 3.1.48) Page 22 of 62 Highway Committee Meeting Minutes May 19, 2026 Page 2 of 2 8. Commissioner's Report Update Only PUBLIC NOTICE Members of the public who wish to address the Committee on specific agenda items must register their request at this time, with such comments subject to the public comment ordinance and the reasonable control of the Committee Chair as set forth in Robert’s Rules of Order. APPROVAL OF MINUTES 9. Approval of April 14, 2026 Minutes A motion was made by Vice Chair S. Cieslewicz, seconded by Member M. Jacowski to approve the minutes. Motion carried by unanimous vote. DISCUSSION/POSSIBLE ACTION NEXT MEETING DATE Tuesday, June 16, 2026 - 3:30 p.m. ADJOURNMENT Adjourned at 4:20 p.m. Page 23 of 62 Portage County 800 Plover Road Highway Department Plover, WI 54467 Nathan Check, PE Phone: 715-345-5355 Commissioner Fax: 715-345-5356 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock Date: July 9, 2026 To: Highway Committee From: Lucas Meddaugh, P.E. Subject: CTH Y (CTH 66 to Dewey Drive) Speed Study Results Introduction A speed study on CTH Y (STH 66 to Dewey Drive), was requested to be reviewed due to concerns of speed and accident frequency. Residents made the request through the Town of Hull. Existing Conditions CTH Y is a two-lane, bi-directional, north-south county highway with 2 – 12 foot lanes, 3 foot paved shoulder and 1 foot aggregate shoulder. This collector highway has two speed limits that are the focus of this study. From the intersection of STH 66 to 2,100ft north of Jordan Road, the speed limit is currently 45-mph. The 55-mph speed limit begins 2,100ft north of Jordan Road and continues beyond Dewey Drive. Dewey Drive is the indicated end point of this study. WisDOT completed a traffic count near the northern terminus of the study area in 2021, which indicated AADT traffic counts of 1,200 veh/day. There are two main segments within the study: Segment #1 is a 45-mph zone, from STH 66 to a point 2,100 feet north of Jordan Road, that has adjacent Portage County Parks (Jordan Park) land on either side, along with private residential buildings. This is a collector segment of CTH Y that is rural with no lateral obstructions within the clear zone or significant vertical clearance issues. There are 6 access points, with one side street intersection at Jordan Road on the southern end of the segment. A 5-year review of the crash history was completed and indicated one crash (exceed speed limit, failure to control, failed to keep in designated lane) with one minor injury. Segment #2 is a 55-mph zone from a point 2,100ft north of Jordan Road to Dewey Drive, which contains 42 access points. Segment #2 will be split into two sub-segments. The 5-year review of crash history is listed within each segment, as well as the adjacent land use(s). This is a collector segment that is rural with no lateral obstructions within the clear zone or significant vertical clearance issues. The sub-segments are denoted below: x Segment #2.1: a point 2,100 feet north of Jordan Road to 1,200 feet north of Sharonwood Lane. This sub-segment contains 18 access points, along with the intersection at Sharonwood Lane. The remaining access points are for residential and agricultural use. The 5-year crash review indicated three crashes and one non-fatal injury: o failure to control, ran off roadway o ran off roadway, failed to keep in designated lane, operated motor vehicle in inattentive, careless, or erratic manner Page 24 of 62 Portage County 800 Plover Road Highway Department Plover, WI 54467 Nathan Check, PE Phone: 715-345-5355 Commissioner Fax: 715-345-5356 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock o failure to control, operated motor vehicle in inattentive, careless, or erratic manner There are current advisory speeds posted on the horizontal curves within this segment which vary from 40-mph to 50-mph. These signs are to indicate to motorists that there are changes in the geometry that may not be apparent or expected, and drivers need to reduce their speed. There are two curves in this segment that have different angular dimensions and have a short connecting straight section between them. The relative closeness with different curve designs has created a localized area of increased crash frequency with three crashes contained within these curves. x Segment #2.2: a point 1,200 feet north of Sharonwood Lane to Dewey Drive. This sub- segment contains 24 access points for residential and agricultural use. The 5-year crash review indicated two crashes and one non-fatal injury: o failed to yield right-of-way, improper turn o failure to control There are current advisory speeds posted on the horizontal curves within this segment which vary from 45-mph to 50-mph. These signs are placed as previously mentioned above. Speed data was collected at three locations within the study area: x 800 feet north of Jordan Road (Segment #1) x 2,700 feet north of Jordan Road (Segment #2.1) x 1,220 feet north of Sharonwood Lane (Segment #2.2) The summary of the speed observations including additional statistics, such as the percent driving over the speed limit and percent driving more than 10 mph above the speed limit, is listed in the following table. CTH Y segment #1 study location observed approximately 77% of the drivers exceeding the speed limit, and 13.2% of the drivers traveling more than 10-mph above the speed limit. The observed median and 85 th percentile speeds were ~49-mph and 55-mph, respectively. Segment #2.1 study location observed just under 39% of the drivers exceeding the speed limit, and slightly less than 2% of the drivers traveling more than 10-mph above the speed limit. The observed median and 85th percentile speeds were ~53-mph and 59-mph, respectively. Segment #2.2 study location observed just over 45.2% of the drivers exceeding the speed limit, and almost 3% of drivers traveling more than 10-mph above the speed limit. The observed median and 85th percentile speeds were ~54-mph and 60-mph, respectively. This information can be seen in Table 1 below: Page 25 of 62 Portage County 800 Plover Road Highway Department Plover, WI 54467 Nathan Check, PE Phone: 715-345-5355 Commissioner Fax: 715-345-5356 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock Table 1 Speed Study Results on CTH Y Segment Speed Limit Median Speed 85th Percentile Speed 10-mph Pace % Over Speed Limit %>10mph Over Speed Limit Segment #1 from STH 66 to a point 2,100 ft north of Jordan Rd 45-mph 49.0- mph 54.6-mph 45 to 54-mph 77% 13.2% Segment #2.1 a point 2,100 ft north of Jordan Rd to 1,200 ft north of Sharonwood Ln 55-mph 53.2- mph 58.9-mph 50 to 59-mph 38.9% 1.8% Segment #2.2 a point 1,200 ft north of Sharonwood Ln to Dewey Dr 55-mph 54.4- mph 60.0-mph 51 to 60-mph 45.2% 2.7% NCHRP 966 Speed Limit Analysis NCHRP Research Report 966: Posted Speed Limit Setting Procedure and Tool was utilized to perform a speed limit analysis on CTH Y. This tool was created to help set reasonable, safe, and consistent speed limits. The NCHRP 966 tool considers all major factors to determine an appropriate speed limit, including operating speeds (median and 85th percentile), ADT, roadway characteristics and geometric conditions, level of development in the surrounding area, as well as several others. The results of the NCHRP 966 tool analysis, show a suggested speed limits for the following segments: x 45-mph for Segment #1: from STH 66 to a point 2,100 ft north of Jordan Rd. x 55-mph for Segment #2.1: a point 2,100 feet north of Jordan Road to 1,200 feet north of Sharonwood Lane x 55-mph for Segment #2.2: a point 1,200 feet north of Sharonwood Lane to Dewey Drive Page 26 of 62 Portage County 800 Plover Road Highway Department Plover, WI 54467 Nathan Check, PE Phone: 715-345-5355 Commissioner Fax: 715-345-5356 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock National tools such as the NCHRP 966 tool are effective at taking information about a highway (e.g., observed speeds, crash history, access point density, surrounding land uses, etc.) and objectively synthesizing that information into a suggested speed limit based on research for setting appropriate speed limits. It is important to adapt suggested speed limits from national tools to local conditions in Wisconsin. Typically, speed limits in Wisconsin are set within 5 mph of the recommended speed limits from a national tool are considered rational speed limits (Highway Safety Improvement Program (HSIP): Speed Management Improvement Project Development Study (WisDOT ID: 0656-43-04) completed by WisDOT and TADI in 2010). Conclusions & Recommendations The results of the study and the NCHRP 966 tool analysis support maintaining the existing posted speed limits along CTH Y, with the exception of Segment #2.1 where crash history and driver behavior indicate the need for a localized speed management intervention. For Segment #1, the tool’s recommended speed limit of 45 mph aligns with the current posted limit. Although crash frequency in this segment is low, observed operating speeds show that the majority of motorists are exceeding the posted limit, and more than 13% are traveling 10 mph or more above it. The combination of elevated operating speeds and a higher pace range suggests that additional law enforcement presence or targeted enforcement campaigns will be necessary to reinforce driver compliance. In Segment #2.1, the NCHRP 966 tool supports the existing 55-mph speed limit; however, the crash history reveals a concentrated pattern of run-off-road and lane-departure crashes within the series of closely spaced horizontal curves. The presence of multiple advisory speeds within short succession appears to be ineffective at influencing driver behavior. Reducing the posted speed limit in this segment would better align driver expectation with actual geometric conditions and is likely to reduce the frequency and severity of future crashes. For Segment #2.2, both the NCHRP 966 recommendation and the operating speed data support maintaining the existing 55-mph posted speed limit. Crashes in this segment are low in frequency, varied in nature, and not tied to specific geometric features. Motorists are generally complying with the existing limit, and no additional enforcement or speed management measures appear necessary. Therefore, it is recommended to: • Retain the existing 45-mph speed limit from STH 66 northward, supplemented with enhanced enforcement to address elevated operating speeds. • Extend the 45-mph speed limit north to a point 1,200 feet north of Sharonwood Lane to provide a consistent and appropriate speed transition through the area of increased crash frequency and complex horizontal alignment. • Retain the existing 55-mph speed limit from a point 1,200 feet north of Sharonwood Lane to Dewey Drive. Page 27 of 62 Portage County 800 Plover Road Highway Department Plover, WI 54467 Nathan Check, PE Phone: 715-345-5355 Commissioner Fax: 715-345-5356 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock Note that we did receive feedback from 6 residents as part of the public outreach process and they all support a speed reduction in the area. If the Committee approves any changes to the speed zones, a resolution and ordinance change will be brought to the August Committee meeting for action. A map of the existing conditions and proposed recommendations is below. Attachments: Public Input Page 28 of 62 Portage County 800 Plover Road Highway Department Plover, WI 54467 Nathan Check, PE Phone: 715-345-5355 Commissioner Fax: 715-345-5356 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock Exhibit 1. Existing Conditions and Proposed Recommendations. Sharonwood Lane Jordan Park Road Dewey Drive Legend 45-mph Zone (Existing) 45-mph Zone (Proposed) 55-mph Zone (Existing) 55-mph Zone (Proposed) Page 29 of 62 From: Jean Buckley To: Meddaugh, Lucas; toenofhull@tn.hull.wi.gov Subject: County Road Y Date: Thursday, July 9, 2026 6:51:48 PM Caution! This message was sent from outside your organization. By way of introduction, this is Jean Buckley and John Thompson, of 2029 County Road Y. I (Jean) attended the meeting last November regarding excessive speeds, unsafe curves, confusing signage AND (not mentioned in the letters) multiple motor vehicle accidents involving damage to people and property. Just last month our mailbox and our neighbor (Mr. & Mrs. L. & A. Hintz’s) mailboxes were destroyed by a vehicle. That driver was not cited for speeding However he not only damaged our mailboxes he also damaged his vehicle and The Hintz’ yard. This issue is really danger to pedestrians, property: The speed limit of 45-55 is too high: the accident last month establishes that standing alone. From Hwy 66 North until the road straightens, the speed limit should be no more than 40 miles per hour. Keeping the speed limit the same, as your letter suggests, is both confusing “45/55mph zone” and currently clearly unsafe. Please consider decreased the speed limit to 40 mph. Sincerely Jean Buckley & John Thompson P.S. I received your letter today July 9, 2026 please allow a longer response time, especially during these summer months. Sent from my iPhone Page 30 of 62 Page 31 of 62 Page 32 of 62 Page 33 of 62 Page 34 of 62 Page 35 of 62 Page 36 of 62 Page 37 of 62 Page 38 of 62 Page 39 of 62 Page 40 of 62 Portage County 800 Plover Road Highway Department Plover, WI 54467 Nathan Check, PE Phone: 715-345-5355 Commissioner Fax: 715-345-5356 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock Date: June 17, 2026 To: Highway Committee From: Lucas Meddaugh, P.E. Subject: CTH KK (800ft south of Timberline Court to the intersection with CTH A) Speed Study Results Introduction A speed study on CTH KK (800ft south of Timberline Court to the intersection with CTH A), was requested to be reviewed for an increase in speed limit, due to apparent operating speeds exceeding posted speed limits and low accident rate. A local resident made the request through the Town of Amherst. Existing Conditions CTH KK is a two-lane, bi-directional, north-south county highway with 2 – 12 foot lanes, 3 foot paved shoulder and 5 foot aggregate shoulder. The speed limit is currently posted as 35-mph for this 1.6 mile segment of collector roadway. This segment of roadway was former USH 10, designed and built in 1967 at a design speed of 70mph. Through increased traffic and updates in design criteria, the roadway design speed was reduced to 55 mph in 1993 along with the updates to the intersection at CTH B/Western Way and USH 10 (known now at CTH KK). The design speed was further reduced to 35-mph through a traffic study and intersection analysis in 2009. WisDOT completed two traffic counts on this segment of roadway in 2021. The counts indicated AADTs of 1,100 vehicles/day just south of the intersection of CTH KK and CTH B/Western Way and 1,500 vehicles/day near the Tomorrow River Bridge. There are 24 access points within the study corridor; of these access points, six are commercial driveways, 11 are private driveways, and there are seven side street intersections: x CTH B (Western Way) / Wilson Street x Lincoln Street x Packer Avenue / South Main Street x Unnamed cul-de-sac x CTH A There are 3 study areas in this corridor that were reviewed: x Northern segment (800ft south of Timberline Court to CTH B / Western Way / Wilson Street Intersection) x Middle segment: the intersection of CTH B / Western Way / Wilson Street and CTH KK x Southern segment, from the intersection of CTH B / Western Way / Wilson Street to the southern Village Limits which includes a short section from the Village limits to CTH A Page 41 of 62 Portage County 800 Plover Road Highway Department Plover, WI 54467 Nathan Check, PE Phone: 715-345-5355 Commissioner Fax: 715-345-5356 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock The northern collector segment (800ft south of Timberline Court to CTH B/Western Way Intersection) is a mix of residential, commercial and agricultural use. The roadway cross section is rural with no lateral obstructions within the clear zone or significant vertical clearance issues. There were no crashes recorded in this segment of roadway during the 5-year review period. The middle segment includes the intersection of CTH KK and CTH B / Western Way / Wilson St which was redesigned and reconstructed in 2020. As part of the design, alternatives from the 2009 traffic study were reviewed. The intersection was ultimately redesigned at a 35-mph speed which allowed an expanded site distance due to tighter widths and radii. There was one crash recorded (failed to yield right-of-way) at the intersection during the latest 5-year review period. The limits of this reconstructed intersection will remain at 35-mph due to the design criteria implemented during realignment. The southern segment is a mix of developed commercial and residential uses that falls inside and outside of the corporate limits of the Village of Amherst. Within the Village Limits, from the intersection of CTH B / Western Way / Wilson Street to the southern Village Limits, it would be categorized as an “Outlying District” due to the spacing of buildings greater than 200ft in any 1,000ft segment. Although, this segment is within the Village of Amherst limits, the roadway cross section is rural with no lateral obstructions within the clear zone or significant vertical clearance issues. There was one crash recorded (failed to yield to right-of-way) during the 5-year review period. The collector segment of roadway that falls outside of the Village Limits (southern Village Limits to CTH A) is a mix of residential and agricultural use. The roadway cross section is rural with no lateral obstructions within the clear zone or significant vertical clearance issues. There was one crash recorded at the intersection of CTH KK and CTH A (following too closely) within this southernmost section for the 5-year review period. Speed data was collected along CTH KK at two locations from 6:00am, 6/2/2026 until 6:00pm, 6/4/2026: x 1000ft north of CTH B/Western Way/Wilson St intersection x 1200ft south of CTH B/Western Way/Wilson St intersection The summary of the speed observations including additional statistics, such as the percent driving over the speed limit and percent driving more than 10 mph above the speed limit, is listed in the following table. The CTH KK northern segment study location observed approximately 93.5% of the drivers exceeding the speed limit, and 33.1% of users traveling more than 10-mph above the speed limit. The observed median and 85 th percentile speeds were ~43-mph and ~49- mph, respectively. The southern segment study location observed approximately 95% of the drivers exceeding the speed limit, and 40.6% of users traveling more than 10-mph above the Page 42 of 62 Portage County 800 Plover Road Highway Department Plover, WI 54467 Nathan Check, PE Phone: 715-345-5355 Commissioner Fax: 715-345-5356 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock speed limit. The observed median and 85th percentile speeds were ~44-mph and ~50-mph, respectively. This information can be seen below: Table 1 Speed Study Results on CTH KK Segment Speed Limit Median Speed 85th Percentile Speed 10-mph Pace % Over Speed Limit %>10mph Over Speed Limit 800ft South of Timberline Ct - CTH B/Western Way/ Wilson St 35-mph 42.9- mph 48.7-mph 39 to 48-mph 93.5% 33.1% CTH B/Western Way/ Wilson St - CTH A 35-mph 44.1- mph 50.3-mph 39 to 48-mph 95.0% 40.6% NCHRP 966 Speed Limit Analysis NCHRP Research Report 966: Posted Speed Limit Setting Procedure and Tool was utilized to perform a speed limit analysis on CTH KK. This tool was created to help set reasonable, safe, and consistent speed limits. The NCHRP 966 tool considers all major factors to determine an appropriate speed limit, including operating speeds (median and 85th percentile), ADT, roadway characteristics and geometric conditions, level of development in the surrounding area, as well as several others. The results of the NCHRP 966 tool analysis, show a suggested speed limit for the northern segment (from 800ft south of Timberline Court to intersection of CTH B/Western Way) on CTH KK of 45-mph. This is a short segment of roadway (0.3miles) to be posted at 45-mph by current Traffic Engineering, Operations, & Safety Manual (TEOpS) 13-5, Table 8.22 Minimum Length of Road for a Speed Limit, guidelines. The recommended distance for a 45-mph speed zone posting is 0.6 miles. The results of the NCHRP 966 tool analysis, show a suggested speed limit for the southern segment (from 1,020ft south of the intersection of CTH B/Western Way/Wilson Street and CTH KK to CTH A) on CTH KK of 50-mph. National tools such as the NCHRP 966 tool are effective at taking information about a highway (e.g., observed speeds, crash history, access point density, surrounding land uses, etc.) and objectively synthesizing that information into a suggested speed limit based on research for Page 43 of 62 Portage County 800 Plover Road Highway Department Plover, WI 54467 Nathan Check, PE Phone: 715-345-5355 Commissioner Fax: 715-345-5356 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock setting appropriate speed limits. It is important to adapt suggested speed limits from national tools to local conditions in Wisconsin. Typically, speed limits in Wisconsin are set within 5 mph of the recommended speed limits from a national tool are considered rational speed limits (Highway Safety Improvement Program (HSIP): Speed Management Improvement Project Development Study (WisDOT ID: 0656-43-04) completed by WisDOT and TADI in 2010). Additionally, the NCHRP Research Report 966: Posted Speed Limit Setting Procedure and Tool shows speeds of 45-mph and 50-mph are ideal for the northern and southern segments, which are greater than the current posted speed limit of 35-mph through these sections of CTH KK. Conclusions & Recommendations Although, the NCHRP 966 Tool recommends a 45-mph speed limit for the segment north of the CTH KK/CTH B intersection to a point 800ft south of Timberline Court. It would be acceptable to create the 45-mph zone between the existing intersection and adjusting the terminus of the 55- mph zone to the north. This would incorporate stopping sight distance ( minimum 250 feet for a 35-mph zone) prior to the intersection. This better aligns with currently traveled speeds, as well as adhering to minimum speed zone lengths in TEOpS 13-5, Table 8.2. The NCHRP 966 Tool recommends a 50-mph speed limit for the segment south of the CTH KK/CTH B intersection to CTH A. It would be acceptable to increase the speed limit from 35- mph to 45-mph, from a point approximately 1,020 ft south of the intersection of CTH B/Western Way to CTH A. This is indicated by the analysis of the observed speeds, which show that more than 95% of roadway users are traveling above the posted speed limit in both sections of the study corridor. Most drivers operate within a pace range of 39/40 to 48/49 (north/south, respectively). Combined with the low, non-localized crash rate, (3 incidents in a 5-year period), the results indicate that roadway users have established a natural pace speed that aligns well with existing roadway geometry and allows them to navigate the corridor safely. Therefore, the recommendation is: x Adjust the 55-mph speed zone southern limit, to end at a point 480 feet north of Timberline Court x Establish a 45-mph speed zone from a point 480 feet north of Timberline Court to a point 575 feet north of the CTH B / Western Way / Wilson Street Intersection x Retain the existing 35-mph zone through the intersection with CTH B /Western Way / Wilson Street x Establish a 45-mph zone from a point beginning 1,020ft south of the intersection with CTH B /Western Way / Wilson Street to the intersection with CTH A Note that we did receive feedback from 6 residents as part of the public outreach process and those comments are attached. Page 44 of 62 Portage County 800 Plover Road Highway Department Plover, WI 54467 Nathan Check, PE Phone: 715-345-5355 Commissioner Fax: 715-345-5356 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock Please see the map below for an overview of the existing conditions and recommendations. If the Committee approves any changes to the speed zones, a resolution and ordinance change will be brought to the August Committee meeting for action. Attachments: Public Feedback Page 45 of 62 Portage County 800 Plover Road Highway Department Plover, WI 54467 Nathan Check, PE Phone: 715-345-5355 Commissioner Fax: 715-345-5356 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock Exhibit 1. Existing Conditions and Proposed Recommendations. Legend 35-mph Zone (Existing) 35-mph Zone (Proposed) 45-mph Zone (Proposed) 55-mph Zone (Existing) 55-mph Zone (Proposed) Timberline Court CTH A Page 46 of 62 From: Victor Voss To: Meddaugh, Lucas Subject: Hwy KK, speed study Date: Tuesday, June 30, 2026 11:13:43 AM Warning! This message was sent from outside your organization and we were unable to verify the sender. Thanks for the notice of the possible speed limit change on Hwy KK between Timberline Ct. and Hwy A/B. I agree with the reduction in speed through the Hwy KK/Western Way/Wilson Street intersection. This is still a very active intersection and could be studied further, possibly with a roundabout or 4-way stop. As Hwy KK was designed for higher speed traffic, I don't believe the roadway itself would cause any concerns; there are also limited driveways on the proposed 45 MPH section, the intersection with Hwy KK/Packer Ave/S. Main Street is a concern. We use this route of travel for emergency vehicles responding into the Village and elsewhere due to the low underpasses on Wilson and Lincoln Streets. With an increase in speed there, additional tree trimming might be necessary. I also have some concerns about the traffic in and out of the newly opened Tomorrow River Supper Club, but again, this used to be Hwy 10. So in summary, I really don't have any major concerns. But if conditions change- more driveways, opening of Lincoln Street, etc. the speed should be reevaluated then. ON a separate note: has there been any consideration by the county to lower the speed limit on Hwy B on the east side of the village between the village limits and Washington St./Hwy V? This is currently posted at 45 MPH, and traffic is moving much faster than that. The roadway now is the east border of the village with McKinley Street, Mill Street, Red Tail Dr, and Washington Street all intersecting with it. There is increased pedestrian traffic as there are no sidewalks or paths. I think this needs to be addressed or at least considered for a reduction in speed, 35 MPH? It also carries a lot of traffic. Thanks, have a great weekend Victor Voss, EFO Fire Chief / Service Director Amherst Fire District 715-824-2699 (office) 715-340-3098 (cell) "Everything admin does is the thrust that reaches the end of the hose line, the blade of the axe, and the tip of the ladder." Page 47 of 62 From: Jodi Patoka To: Meddaugh, Lucas Subject: Proposed speed limit increase on CTY KK Date: Tuesday, July 7, 2026 8:49:36 AM Caution! This message was sent from outside your organization. To: Portage County Highway Committee From: Dave Crubaugh, Village of Amherst President Re: Proposed speed limit increase on CTY KK In 2023, Steve Cieslewicz approached the Village of Amherst Board to request a speed study of this segment of CTY KK. The Village’s portion of KK is approximately 1.18 miles, or about 75% of this segment of road. By increasing the speed from 35 mph to 55 mph, this will decrease the driver’s commute by only 44 seconds. An increase to 45 mph would have no significant difference to commute time. Village residents that live near the intersection of KK, Packer Ave, and South Main St. have expressed concerns crossing this intersection at the current speeds. Raising the speed limit would significantly increase the risk crossing here. At the Village Board’s June 13, 2023 meeting, the Board unanimously voted to deny the speed study so that speed would not be adjusted. The property adjacent to KK in the village is zoned general business, single, and multifamily residential. This segment of the Village is one of the few areas for potential expansion, especially for homes. A speed increase would make conditions potentially dangerous for future driveways. As the municipality with the majority of properties along the corridor, our hope is that our concerns would be given primary consideration. Convenience should never outweigh safety concerns. Thanks for consideration of our concerns. Jodi Patoka on behalf of Dave Crubaugh, Village President Clerk/Treasurer Village of Amherst 160 Mill St., P.O. Box 36 Amherst, WI 54406 Phone: (715) 824-5613 Fax: (715) 824-5713 Page 48 of 62 Page 49 of 62 Page 50 of 62 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang /uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock Portage County Highway Department Nathan Check, PE Commissioner 800 Plover Road Plover, WI 54467 Phone: 715-345-5355 Fax:715 -345 -5356 Date: July 14, 2026 To: Highway Committee From: Nathan Check, P.E. Subject: Discussion and Possible Action on Rumble Strip Installation on CTH N east of CTH BB, Town of Buena Vista Background: Please see the attached email from a resident requesting rumble strips on CTH N at the intersection with CTH BB in the Town of Buena Vista. The Highway Department has also received a call from another resident with a similar request due to a fatality in May of 2026. The accident report did verify that the driver did stop at the stop sign on CTH N but proceeded westward as they did not see a motorcycle traveling south. Both the email and caller stated that they have witnessed multiple near-misses at the intersection due to vehicles not stopping. For past requests, rumble strip requests have been reviewed by the Committee with staff analysis. While they have proven effective for additional warning for stop controlled intersections, they typically would only be used for areas with accident history, geometric concerns, or other reasons as they may have an impact on surrounding properties. The intersection is an unlit rural 4-way intersection with stop control on CTH N on the east side and Bluff Road on the west side. The Highway Department reviewed the sight distance along CTH N for both the Stop Ahead and Stop sign and found them to well exceed the 55 mph speed limit. One item to note is that there is a slight vertical crest curve before the intersection. While the stop sign is visible from over 600’ away, the s ign is visible at the bottom of the vision profile which is not a typical location where drivers may identify it. The sight distance along CTH BB was also reviewed and found to exceed the requirements in both directions. The nearest home on the east side of the intersection is approximately 250’ away at 6539 CTH N and appears to be inhabitable. There is also a shed and a grain storage facility located on the east side of the intersection. On the west side, there are two homes located between 500’ to 600’ from the intersection with the next nearest residence over 1,100’ away. The nearest homes south and north of the intersection are also over 1,000’ away. An overview of the area is below with an approximate ¼ mile radius shown. As part of the rumble strip request process, the Department sends out the attached letter to any properties within ¼ mile of the intersection. Page 51 of 62 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang /uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock /uni0050/uni006F/uni0072/uni0074/uni0061/uni0067/uni0065/uni0020/uni0043/uni006F/uni0075/uni006E/uni0074/uni0079 /uni0048/uni0069/uni0067/uni0068/uni0077/uni0061/uni0079/uni0020/uni0044/uni0065/uni0070/uni0061/uni0072/uni0074/uni006D/uni0065/uni006E/uni0074 /uni004E/uni0061/uni0074/uni0068/uni0061/uni006E/uni0020/uni0043/uni0068/uni0065/uni0063/uni006B/uni002C/uni0020/uni0050/uni0045 /uni0043/uni006F/uni006D/uni006D/uni0069/uni0073/uni0073/uni0069/uni006F/uni006E/uni0065/uni0072 /uni0038/uni0030/uni0030/uni0020/uni0050/uni006C/uni006F/uni0076/uni0065/uni0072/uni0020/uni0052/uni006F/uni0061/uni0064 /uni0050/uni006C/uni006F/uni0076/uni0065/uni0072/uni002C/uni0020/uni0057/uni0049/uni0020/uni0035/uni0034/uni0034/uni0036/uni0037 /uni0050/uni0068/uni006F/uni006E/uni0065/uni003A/uni0020/uni0037/uni0031/uni0035/uni002D/uni0033/uni0034/uni0035/uni002D/uni0035/uni0033/uni0035/uni0035 /uni0046/uni0061/uni0078/uni003A/uni0037/uni0031/uni0035 /uni002D/uni0033/uni0034/uni0035 /uni002D/uni0035/uni0033/uni0035/uni0036 Analysis: In addition to the intersection geometry and sight distance, the accident history is also reviewed. For WisDOT highways, they typically would only install rumble strips to reinforce the presence of the stop sign if the intersection experienced 2 failure to stop crashes in a 12 month period or 3 such crashes in a 5 year period. The 3 failure to stop crashes within a 5 year period is also consistent with Federal Highway Administration’s recommendation. Page 52 of 62 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang /uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock Portage County Highway Department Nathan Check, PE Commissioner 800 Plover Road Plover, WI 54467 Phone: 715-345-5355 Fax:715 -345 -5356 The Highway Department has reviewed the intersection crash history for the past 5 years. Overall, the intersection has a low crash history with two non-deer related crashes over this time. One accident was the fatal accident due to looking but not seeing and the second was a sideswipe at the intersection with a northbound to eastbound turning vehicle that hit a vehicle stopped at the intersection. Staff further reviewed the accident history for a total of 10 years and found one additional accident in 2018. This accident was a result of a westbound vehicle failing to stop at the stop sign. The driver of the unit claimed to have looked before entering the intersection but did not see a southbound vehicle. The Department understands that near-misses are not accounted for in the recorded crash history and two local residents have stated that they have experienced other near misses. Fiscal Impact: The Highway Department’s General Maintenance budget has adequate funds to cover the rumble strip installation if approved. Recommendation: While the intersection crash history does not meet the WisDOT or FHWA crash history warrants, staff recommends that the Committee consider the request for this specific area with input from the surrounding residents. Staff has received one phone call for the nearest house west of the intersection who has stated that they support the rumble strips. Rumble strips were added to the CTH N and CTH J intersection immediately east of this intersection in 2017 after a failure to stop which resulted in a fatality. Drivers may have an expectation of additional notice for the stop condition due to the adjacent intersection. In lieu of rumble strips, additional measures can be implemented at the intersection which could include increasing the stop sign size and adding flags to the stop ahead and/or stop signs. The additional flags would also increase the conspicuity of the stop sign. Attachments: Email Request Property Owner Letter Page 53 of 62 1 Check, Nathan From: Check, Nathan Sent: Wednesday, May 6, 2026 6:40 AM To: 'Heather.Stroik@sentry.com' Cc: Meddaugh, Lucas; Johnson, David Subject: RE: Intersection of Cty Rd N & Cty Rd BB Good morning Heather, Thank you for reaching out regarding your concerns at the CTH N and BB intersection. Our Department /uni0077i/uni006C/uni006C /uni0062e /uni0077orking /uni0077ith the /uni0053heri/g431/uni2019s O/g431ice on a fu/uni006C/uni006C re/uni0076ie/uni0077 of the intersection /uni0077hich /uni0077i/uni006C/uni006C /uni006Cook at the accident history, geometry, and signage. The re/uni0076ie/uni0077 /uni0077i/uni006C/uni006C a/uni006Cso inc/uni006Cude consideration of other safety measures such as additiona/uni006C signs or other impro/uni0076ements such as rum/uni0062/uni006Ce strips. I /uni0077i/uni006C/uni006C /uni0062e in touch after /uni0077e comp/uni006Cete our re/uni0076ie/uni0077. If you ha/uni0076e any questions in the meantime, p/uni006Cease fee/uni006C free to ca/uni006C/uni006C or emai/uni006C. Take care, Nathan Nathan Check, PE Highway Commissioner 800 Plover Road Plover, WI 54467 checkn @co.portage.wi.gov Phone: 715-345-5230 Cell: 715-630-2203 Fax: 715-345-5356 From: Stroik Heather < Heather.Stroik@sentry.com > Sent: Tuesday, May 5, 2026 9:22 AM To: Highway Department < Highway@co.portage.wi.gov > Cc: Stroik Heather < Heather.Stroik@sentry.com > Subject: Intersection of Cty Rd N & Cty Rd BB Good morning, I’m sending this email regarding the intersection of Cty Rd N & Cty Rd BB in Portage County, WI. My family /uniflfl5-hus/uniflflY5and & young children/uniflfl53 li/uniflfl7Ye on Blu/gAJ1 Road in Buena /uniflfl!Yista. We sadly came upon the accident at the intersection of Cty Rd BB & Blu/gAJ1 Road on /uniflfl!Junday morning. We came upon it within a few minutes of it happening and /uniflflY5efore law enforcement or medical emergency had arri/uniflfl7Yed. It’s something I pray we ne/uniflfl7Yer ha/uniflfl7Ye to witness again. Now each time we lea/uniflfl7Ye our home/uniflflJB we must stop at the stop sign on Blu/gAJ1 Rd & Cty Rd BB and /uniflflY5e reminded of the accident /uniflflY5y the flowers /uniflflY5y the stop sign. We tra/uniflfl7Yel this intersection multiple times a day. /uniflfl!Je/uniflfl7Yeral times coming West on Cty Rd N. O/uniflfl7Yer the last 11 years we ha/uniflfl7Ye li/uniflfl7Yed on Blu/gAJ1 Road, I ha/uniflfl7Ye seen se/uniflfl7Yeral times, accidents almost happen. /uniflfl!Ahere is a /uniflflY5lind spot when you are on Cty Rd N going West and at the stop sign. Within the last 5 years, there was another fatal accident on Cty Rd N & Cty Rd J that resulted in a fatality. /uniflfl!Ahey added rum/uniflflY5le strips in the road /uniflflY5ut ne/uniflfl7Yer added them to the intersection of the recent accident. I’m asking out of concern and safety of other dri/uniflfl7Yers and my family that something /uniflflY5e done at this intersection. May/uniflflY5e add rum/uniflflY5le strips, add a flashing stop sign. Anything! I do not want another family to ha/uniflfl7Ye to go through Page 54 of 62 2 what the families are going through from the recent accident, and I don’t want my young children, hus/uniflflY5and, and myself to witness this again. You may contact me at 715-340-8464 or /uniflflY5y email. /uniflfl!Ahank you for reading this and taking my concerns into consideration. Heather /uniflfl!Jtroik 6455 Blu/gAJ1 Rd Bancroft, WI 54921 /uniflfl!Ahis e-mail is confidential. If you are not the intended recipient, you must not disclose or use the information contained in it. If you ha/uniflfl7Ye recei/uniflfl7Yed this e-mail in error, please tell us immediately /uniflflY5y return e-mail and delete the document. No recipient may use the information in this e-mail in /uniflfl7Yiolation of any ci/uniflfl7Yil or criminal statute. We disclaim all lia/uniflflY5ility for any unauthorized uses of this e-mail or its contents, and accept no lia/uniflflY5ility or responsi/uniflflY5ility for any damage caused /uniflflY5y any /uniflfl7Yirus transmitted with this e-mail. /uniflfl!Ao learn more a/uniflflY5out our pri/uniflfl7Yacy policy, please /uniflfl7Yisit sentry.com/pri/uniflfl7Yacy. Page 55 of 62 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang /uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock Portage County Highway Department Nathan Check, PE Commissioner 800 Plover Road Plover, WI 54467 Phone: 715-345-5355 Fax:715 -345 -5356 June 18, 2026 Re: Rumble Strip Request for CTH N and CTH BB intersection, Town of Buena Vista Dear Property Owner, The Portage County Highway Department has received requests to install rumble strips on the westbound approaches of CTH N at the CTH BB intersection in the Town of Buena Vista. The requests are driven from the recent fatal crash as well as reports of many near-misses by local residents in the area. In coordination with the Sheriff’s office, the Highway Department has reviewed the intersection crash history over the past 10 years. Overall, the intersection has a low crash history with 3 non- deer related crashes over this 10 year period. A brief accident history is below: • May 2026 – Westbound vehicle stopped at the stop si gn but then proceeded into the intersection while not seeing a southbound motorcycle. • December 2024 – Northbound vehicle turning east ont o CTH N slid into a vehicle stopped at the stop sign. • November 2018 – Westbound vehicle failed to stop at the stop sign and struck a southbound vehicle. The westbound vehicle claimed to have looked before entering the intersection but did not see the other vehicle. The Department understands that near-misses are not accounted for in the recorded crash history, and we will be reviewing other characteristics of the intersection such as the geometry and sight distances. In addition, the next step of the Department’s review process is to gather local input from near-by residents. Rumble strips have been proven to reduce intersection crashes, but one of the pitfalls is noise disturbance for near-by residents. The Portage County Highway Committee will be discussing this topic at their next meeting held at 3:30 pm, Tuesday, July 21 st at the Portage County Annex Building , 1462 Strongs Avenue, Stevens Point, WI. We encourage residents to attend to provide input in regards to this issue. If you are not able to make the meeting, we also encourage any feedback through phone, mail, or email. Please feel free to contact me directly at 715-345-5230 or checkn@co.portage.wi.gov . If the rumble strips are approved by the Highway Committee, we would anticipate installation later this year. In the meantime, the Department is also considering increasing the stop sign size and adding flags as other measures to improve safety at the intersection. Page 56 of 62 County Engineer – Lucas Meddaugh Co unty Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang /uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock /uni0050/uni006F/uni0072/uni0074/uni0061/uni0067/uni0065/uni0020/uni0043/uni006F/uni0075/uni006E/uni0074/uni0079 /uni0048/uni0069/uni0067/uni0068/uni0077/uni0061/uni0079/uni0020/uni0044/uni0065/uni0070/uni0061/uni0072/uni0074/uni006D/uni0065/uni006E/uni0074 /uni004E/uni0061/uni0074/uni0068/uni0061/uni006E/uni0020/uni0043/uni0068/uni0065/uni0063/uni006B/uni002C/uni0020/uni0050/uni0045 /uni0043/uni006F /uni006D/uni006D/uni0069/uni0073/uni0073/uni0069/uni006F/uni006E/uni0065/uni0072 /uni0038/uni0030/uni0030/uni0020/uni0050/uni006C/uni006F/uni0076/uni0065/uni0072/uni0020/uni0052/uni006F/uni0061/uni0064 /uni0050/uni006C/uni006F/uni0076/uni0065/uni0072/uni002C/uni0020/uni0057/uni0049/uni0020/uni0035/uni0034/uni0034/uni0036/uni0037 /uni0050/uni0068/uni006F/uni006E/uni0065/uni003A/uni0020/uni0037/uni0031/uni0035/uni002D/uni0033/uni0034/uni0035/uni002D/uni0035/uni0033/uni0035/uni0035 /uni0046/uni0061/uni0078/uni003A/uni0037/uni0031/uni0035/uni002D/uni0033/uni0034/uni0035/uni002D/uni0035/uni0033/uni0035/uni0036 Regards, Nathan Check, P.E. checkn@co.portage.wi.gov Intersection Map Page 57 of 62 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang /uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock Portage County Highway Department Nathan Check, PE Commissioner 800 Plover Road Plover, WI 54467 Phone: 715-345-5355 Fax:715 -345 -5356 Date: July 14, 2026 To: Highway Committee From: Nathan Check, P.E. Subject: Discussion and Possible Action on CTH E(CTH HH – Da m Road) Project Budget Amendment Request Background: As part of the Highway Department’s Capital Improvement Plan, CTH E from CTH HH to Dam Road was originally planned for a mill and overlay in 2027. Analysis: This project is proposed to be accelerated to 2026 for the following reasons. 1. The roadway surface is deteriorating at a faster rate requiring additional maintenance and safety concerns. 2. The CTH E structure over the Wisconsin River is within this section of roadway and the Department has applied for funding through the Wisconsin Department of Transportation for replacement in 2027. This would require a full closure, and it would be difficult and more expensive to attempt to complete both projects in the same year due to trucking issues with the bridge closure. 3. There are adequate resources to complete the project this year after the completion of the CTH D project. Fiscal Impact: There are adequate funds in the Vehicle Registration Fee fund to complete this project in 2026. Recommendation: Staff recommends that the Committee consider and approve the budget amendment request. Attachments: Budget Amendment/Transfer Request Form Page 58 of 62 County of Portage Finance Department Budget Amendment/Transfer Request Form Policy #: TBD Effective: September 21, 2025 Department: HIGHWAY DEPARTMENT Fiscal Year: 2026 Submitted By: Stacy Zerby Date Submitted: Type: Check one Description: CTH E (CTH HH – DAM RD) PROJECT County Board Date: ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☒ ☐ Transfer within appropriation – account to account (Department Director) Transfer due to technical correction – tracking or accounting purposes (Finance Director) Transfer up to 10% of original appropriation (Finance Committee) Transfer over 10% of original appropriation (County Board) Transfer between two or more departments (County Board) Increase in appropriation with grant revenue – new grant or increased funding (County Board) Increase in appropriation with contingency funds (County Board) Increase in appropriation with offsetting revenue or existing fund balance (County Board) Increase in appropriation with General Fund (County Board) Justification for Budget Amendment/Transfer: Fiscal Impact: $680,095 As part of the Highway Department’s Capital Improvement Plan, CTH E from CTH HH to Dam Road was originally planned for a mill and overlay in 2027. This project is proposed to be accelerated to 2026 for the following reasons. 1. The roadway surface is deteriorating at a faster rate requiring additional maintenance and safety concerns. 2. The CTH E structure over the Wisconsin River is within this section of roadway and the Department has applied for funding through the Wisconsin Department of Transportation for replacement in 2027. This would require a full closure, and it would be difficult and more expensive to attempt to complete both projects in the same year. There are adequate funds in the Vehicle Registration Fee fund to complete this project in 2026. Attachments Department Head Nathan Check AUTHORIZATION Finance Staff Recommendation Approval documented in EERP System County Executive Approval documented in EERP System Governing Committee Action: Approval documented in EERP System Meeting Date: 7/21/26 Finance Committee Action: Approval documented in EERP System Meeting Date: Financial Action Increase Decrease Fund Name/Account Description Account Number Requested Amount ☒ ☐ Enterprise – Construction – Contract Enterprise – Paving - Contract 61317030-52100 61317040-52100 $140,000 $510,000 ☒ ☐ Enterprise - CTHS Local Highway Revenue Enterprise – Local-Highway-Nonhighway Activities 61317000-47430 61000000-47492 $650,000 $30,095 ☒ ☐ Enterprise – Designated for future use 61310000-59100 $30,095 ☒ ☐ Special Revenue - CTH System charges 21317000-52395 $680,095 ☒ ☐ Special Revenue - Fund Balance Applied (Wheel Tax) 21317000-49300 $680,095 Finance Director Initials Comments: Page 59 of 62 /uni0043/uni006F/uni0075/uni006E/uni0074/uni0079 /uni0045/uni006E/uni0067/uni0069/uni006E/uni0065/uni0065/uni0072 /uni2013 /uni004C/uni0075/uni0063/uni0061/uni0073 /uni004D/uni0065/uni0064/uni0064/uni0061/uni0075/uni0067/uni0068 /uni0043/uni006F/uni0075/uni006E/uni0074/uni0079 /uni0050/uni0061/uni0074/uni0072/uni006F/uni006C /uni004D/uni0061/uni006E/uni0061/uni0067/uni0065/uni0072 /uni2013 /uni004B/uni006F/uni0072/uni0079 /uni004B/uni0075/uni006B/uni0075/uni0063/uni007A/uni006B/uni0061 /uni0053/uni0074/uni0061/uni0074/uni0065 /uni0050/uni0061/uni0074/uni0072/uni006F/uni006C /uni004D/uni0061/uni006E/uni0061/uni0067/uni0065/uni0072 /uni2013 /uni0044/uni0061/uni0076/uni0069/uni0064 /uni004A/uni006F/uni0068/uni006E/uni0073/uni006F/uni006E /uni0050/uni0061/uni0072/uni0074/uni0073 /uni0052/uni006F/uni006F/uni006D /uni002F /uni0053/uni0068/uni006F/uni0070 /uni004D/uni0061/uni006E/uni0061/uni0067/uni0065/uni0072 /uni2013 /uni0043/uni006F/uni0072/uni0065/uni0079 /uni0047/uni0069/uni0065/uni0073/uni0065 /uni0041/uni0073/uni0073/uni0069/uni0073/uni0074/uni0061/uni006E/uni0074 /uni0050/uni0061/uni0074/uni0072/uni006F/uni006C /uni004D/uni0061/uni006E/uni0061/uni0067/uni0065/uni0072 /uni2013 /uni0042/uni006F/uni0062 /uni004C/uni0061/uni006E/uni0067 /uni0046/uni0069/uni006E/uni0061/uni006E/uni0063/uni0065 /uni004F/g431/uni0069/uni0063/uni0065 /uni0053/uni0075/uni0070/uni0065/uni0072/uni0076/uni0069/uni0073/uni006F/uni0072 /uni2013 /uni0053/uni0074/uni0061/uni0063/uni0079 /uni005A/uni0065/uni0072/uni0062/uni0079 /uni0046/uni0069/uni006E/uni0061/uni006E/uni0063/uni0069/uni0061/uni006C /uni0041/uni0073/uni0073/uni006F/uni0063/uni0069/uni0061/uni0074/uni0065 /uni0049/uni0049/uni0049 /uni2013 /uni004B/uni0072/uni0069/uni0073/uni0074/uni0065/uni006E /uni0048/uni0061/uni006E/uni0063/uni006F/uni0063/uni006B /uni0050/uni006F/uni0072/uni0074/uni0061/uni0067/uni0065/uni0020/uni0043/uni006F/uni0075/uni006E/uni0074/uni0079 /uni0048/uni0069/uni0067/uni0068/uni0077/uni0061/uni0079/uni0020/uni0044/uni0065/uni0070/uni0061/uni0072/uni0074/uni006D/uni0065/uni006E/uni0074 /uni004E/uni0061/uni0074/uni0068/uni0061/uni006E/uni0020/uni0043/uni0068/uni0065/uni0063/uni006B/uni002C/uni0020/uni0050/uni0045 /uni0043/uni006F/uni006D/uni006D/uni0069/uni0073/uni0073/uni0069/uni006F/uni006E/uni0065/uni0072 /uni0038/uni0030/uni0030/uni0020/uni0050/uni006C/uni006F/uni0076/uni0065/uni0072/uni0020/uni0052/uni006F/uni0061/uni0064 /uni0050/uni006C/uni006F/uni0076/uni0065/uni0072/uni002C/uni0020/uni0057/uni0049/uni0020/uni0035/uni0034/uni0034/uni0036/uni0037 /uni0050/uni0068/uni006F/uni006E/uni0065/uni003A/uni0020/uni0037/uni0031/uni0035/uni002D/uni0033/uni0034/uni0035/uni002D/uni0035/uni0033/uni0035/uni0035 /uni0046/uni0061/uni0078/uni003A/uni0037/uni0031/uni0035 /uni002D/uni0033/uni0034/uni0035 /uni002D/uni0035/uni0033/uni0035/uni0036 Date: July 16, 2026 To: Highway Committee From: Nathan Check, P.E. Subject: Discussion and Possible Action on Contract with TerraVentures Advisors, LLC for Professional Real Estate Services for CTH R Project Background: Highway staff had worked with the Purchasing Department to issue a Request for Proposals(RFP) for real estate acquisition services for future roadway projects which include CTH R and T. The services include appraisals, negotiations, acquisition services, and maintenance of project files in accordance with Wisconsin Statutes and Administration Codes as well as the WisDOT Real Estate Program Manual. Analysis: Four proposals were received with TerraVenture Advisors, LLC rated as the highest proposal. Staff has worked with TerraVenture on developing a scope, negotiating a price, and setting the schedule for the CTH R project. The project will consist of 13 properties with a mix of Fee and Temporary Limited Easements plus 9 utility release of rights. As is past projects, a sales study will be completed to provide the initial offering prices. At this time, no appraisals are anticipated but property owners may request one based on state statute. Fiscal Impact: The pricing for the contract is below. The estimated cost of the contract is $25,450. If appraisals are requested, this cost will be charged at the per unit price. The 2026 Highway Department budget included approximately $346,000 of total Highway design project funds to cover any design and real estate services. As reported previously to the Committee, the local costs for the CTH R project will be covered by the Village of Plover per the Memorandum of Understanding(MOU) and Jurisdictional Transfer Agreement(JTA) for the Page 60 of 62 /uni0043/uni006F/uni0075/uni006E/uni0074/uni0079 /uni0045/uni006E/uni0067/uni0069/uni006E/uni0065/uni0065/uni0072 /uni2013 /uni004C/uni0075/uni0063/uni0061/uni0073 /uni004D/uni0065/uni0064/uni0064/uni0061/uni0075/uni0067/uni0068 /uni0043/uni006F/uni0075/uni006E/uni0074/uni0079 /uni0050/uni0061/uni0074/uni0072/uni006F/uni006C /uni004D/uni0061/uni006E/uni0061/uni0067/uni0065/uni0072 /uni2013 /uni004B/uni006F/uni0072/uni0079 /uni004B/uni0075/uni006B/uni0075/uni0063/uni007A/uni006B/uni0061 /uni0053/uni0074/uni0061/uni0074/uni0065 /uni0050/uni0061/uni0074/uni0072/uni006F/uni006C /uni004D/uni0061/uni006E/uni0061/uni0067/uni0065/uni0072 /uni2013 /uni0044/uni0061/uni0076/uni0069/uni0064 /uni004A/uni006F/uni0068/uni006E/uni0073/uni006F/uni006E /uni0050/uni0061/uni0072/uni0074/uni0073 /uni0052/uni006F/uni006F/uni006D /uni002F /uni0053/uni0068/uni006F/uni0070 /uni004D/uni0061/uni006E/uni0061/uni0067/uni0065/uni0072 /uni2013 /uni0043/uni006F/uni0072/uni0065/uni0079 /uni0047/uni0069/uni0065/uni0073/uni0065 /uni0041/uni0073/uni0073/uni0069/uni0073/uni0074/uni0061/uni006E/uni0074 /uni0050/uni0061/uni0074/uni0072/uni006F/uni006C /uni004D/uni0061/uni006E/uni0061/uni0067/uni0065/uni0072 /uni2013 /uni0042/uni006F/uni0062 /uni004C/uni0061/uni006E/uni0067 /uni0046/uni0069/uni006E/uni0061/uni006E/uni0063/uni0065 /uni004F/g431/uni0069/uni0063/uni0065 /uni0053/uni0075/uni0070/uni0065/uni0072/uni0076/uni0069/uni0073/uni006F/uni0072 /uni2013 /uni0053/uni0074/uni0061/uni0063/uni0079 /uni005A/uni0065/uni0072/uni0062/uni0079 /uni0046/uni0069/uni006E/uni0061/uni006E/uni0063/uni0069/uni0061/uni006C /uni0041/uni0073/uni0073/uni006F/uni0063/uni0069/uni0061/uni0074/uni0065 /uni0049/uni0049/uni0049 /uni2013 /uni004B/uni0072/uni0069/uni0073/uni0074/uni0065/uni006E /uni0048/uni0061/uni006E/uni0063/uni006F/uni0063/uni006B Portage County Highway Department Nathan Check, PE Commissioner 800 Plover Road Plover, WI 54467 Phone: 715-345-5355 Fax:715 -345 -5356 CTH R corridor. These costs will be billed back to the Village upon the County receiving the invoicing. Recommendation: Staff recommends approval of the award to TerraVenture Advisors, LLC. The final plat and relocation order will be brought to the Committee at the August meeting for consideration. Attachments: None Page 61 of 62 Portage County 800 Plover Road Highway Department Plover, WI 54467 Nathan Check, PE Phone: 715-345-5355 Commissioner Fax: 715-345-5356 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patr ol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assista nt Patrol Manager – Bob Lang Finance Office Supervisor – Stacy Zerby Financia l Associate III – Kristen Hancock Date: July 14, 2026 To: Highway Committee From: Nathan Check, P.E. Subject: Discussion and Possible Action on 2026 Equipment Purchase – Underbody Plows Background: The purchase of three 2027 truck chassis were approved by the Committee at the February meeting. Two of the chassis will now need to be outfitted with snow and ice equipment. Typically, the underbody plows were included in the snow and ice equipment bid but beginning in 2023, we began experiencing supply, delivery, and service issues. This resulted in us researching other options. Analysis: The most advantageous option has been a Minnesota DOT contract pricing through Universal Truck Equipment for a total price of $40,210 including freight for two underbodies. For comparison, our cost last year was $39,096. Fiscal Impact: The two plow chassis and their equipment will be included in next year’s Machinery budget but it is prudent to lock these prices in now as the MN state contract extension will likely see an increase in the new year. Recommendation: Staff recommends that the Committee approve the purchase of 2 underbody plows from Universal Truck Equipment. They have provided the underbodies the last three years with no issues. Attachments: None Page 62 of 62

Source: Town of Grant website. First collected Nov 6, 2026.