RecordWell Data

Board of Public Works — Agenda Packet

City of Stevens Point · Portage County · Board of Public Works · meeting of Nov 9, 2026 · Agenda packets

Open the original document More from City of Stevens Point

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Our intention is to have in-person meetings going forward. For the time being, we will hold the City Committee Meetings, Plan Commission, Council and most others at the Community Room at 933 Michigan Avenue. This in-person location will meet the legal requirement for our open meetings. We will have a virtual option available, but the technology for the hybrid style meeting may not be reliable all of the time. AGENDA BOARD OF PUBLIC WORKS Members • Mayor Wiza • Alderperson Kneebone • Alderperson Morrow • Alderperson Keymer • Alderperson Shuda • Alderperson Christianson • Chris Tiffany Date and Time: November 9, 2026 6:05 PM (or immediately following previously scheduled meeting) Location: Community Room 933 Michigan Avenue, Stevens Point, WI OR Zoom Teleconferencing Meeting ID: 880 4863 2262 Passcode: 303565 By Computer: Zoom Link By Phone: +1-312-626-6799 (US Chicago) Roll Call Informational 1. Director's Report a. Division and Church Streets Reconstruction Projects Discussion and Possible Action 2. To approve the Ordinance Amendment in Chapter 16, Section 16.15, as it relates to the Right of Way, Boulevards, and Swales. Adjourn PLEASE TAKE NOTICE that any person who has special needs while attending these meetings or needs agenda materials for these meetings should contact the City Clerk as soon as possible to ensure that a reasonable accommodation can be made. The City Clerk can be reached by telephone at (715) 346-1569 or by mail at 1515 Strongs Avenue, Stevens Point, WI 54481. Copies of ordinances, resolutions, reports and minutes of the committee meetings are on file at the office of the City Clerk for inspection during normal business hours from 7:30 a.m. to 4:00p.m. PLEASE TAKE FURTHER NOTICE that a quorum of the Common Council may be in attendance at this meeting. Page 1 of 11 s t e v e n s p o i n t . c o m November 4, 2026 DIRECTOR OF PUBLIC WORKS REPORT Scott Beduhn 1. Engineering Division • Division and Church Streets Reconstruction Project: o South Segment (South City Limits to Michigan Avenue). ▪ All utility work is complete. ▪ Stage 4 mainline paving is complete; tie-ins between the new pavement and existing pavements remain to be done. ▪ Stage 5 mainline paving is underway. ▪ Due to delays in the delivery of the signal and lighting equipment, temporary traffic signals and WPS lighting will be utilized over the winter. o North Segment (Briggs Street to North Point Drive) ▪ Utility work on Stage 1 is complete, and the Utility contractor is working on Stage 2. ▪ Paving is generally complete within Stage 1, with some ancillary work yet to be completed. ▪ Real Estate acquisition continues. The City still needs to acquire interest in three parcels at the intersection of Maria Drive. ▪ WPS continues to work on the relocation of their infrastructure. The work is being done concurrently with the road work. o City staff were notified that our STP-Urban application for the South Segment between Rice Street and Francis Street was selected. The grant award is approximately $3.1 million. o Final design for the South Segment Phases 2 and 3 is nearing the 60 percent design level. ▪ Real estate acquisition is underway for South Segment Phase 2. Right of Way Professional recently completed the sales study and nominal parcel report. • Fall Paving Project: o This work is currently underway. Weather dependent, this work should take about a week to complete. • Pavement Maintenance Project: o This year’s pavement maintenance has been completed. • Downtown Concrete Joint Repair Project: o Staff continues to evaluate potential next phases of this project, looking at Water Street/Second Street between Clark Street and Portage Street. While staff was anticipating completing some of this work this spring, staff is currently pausing as we continue to evaluate downtown transportation needs and discuss longer-term pavement solution options with WisDOT. City of Stevens Point 1515 Strongs Avenue Stevens Point, WI 54481 Public Works Engineering Department: Phone: 715-346-1561 Fax: 715-346-1650 Streets Department: Phone: 715-346-1537 Fax: 715-346-1687 Page 2 of 11 s t e v e n s p o i n t . c o m • Michigan Avenue Underpass: o The work is substantially complete, and the underpass is open to traffic. The contractor continues to work on a few remaining items. • Hoover Road Intersections Signalization: o All work is complete. The contractor will return in the spring to address any warranty items. • West Scott Street: o All utility work is complete, and the contractor is building the road. The project should be wrapped up in the next couple of weeks. • 2027 Street Improvement Project(s): o The 2027 Street Improvement Project will consist of several road resurfacing projects. The first of several bid packages is being worked on now for an anticipated late 2026 or early 2027 bid opening. ▪ The first bid package will include the resurfacing of Michigan Avenue between Church Street and Patch Street. ▪ The second bid package will include the resurfacing of Patch Street and Industrial Park Road between Michigan Avenue and Hoover Road. • Traffic Signal Upgrade: o Staff is working on a multi-year effort to modernize and upgrade the City’s traffic signal systems. These upgrades include new controllers and communications, camera systems, pedestrian pushbuttons, and emergency vehicle preemption. o Some of the improvements will be made in conjunction with other planned projects, such as the Business 51and Michigan Avenue underpass, while others will be completed using the annual signal improvement capital budget line item. o Staff applied for grants under the WisDOT Signals and ITS Standalone Program (SISP). The SISP program is for state-controlled intersections and extends to municipalities for connecting highways. The grants cover up to 90 percent of all eligible costs. ▪ City staff has received State/Municipal Financial Agreements for both grant awards. The City will receive just over $600,000 to replace 13 outdated signal control cabinets along STH 66. ▪ Procurement and installation documents will be prepared this winter in anticipation of installing the new cabinets in the spring. • Park Street Railroad Crossing Closure Investigation: o Staff continues to work with Canadian National Railway (CN) on the potential closure of the Wood Street crossing in lieu of Park Street. CN has agreed to file a petition to introduce the Wood Street closure option to the Office of the Commissioner of Railroads (OCR). o CN has informed OCR staff of the preferred plan; however, we are still waiting to file a formal petition with OCR. • Patch Street Railroad Crossing Alteration: o OCR held a virtual public hearing on March 3, 2026. o While the City will be financially responsible for safety improvements, no official order was delivered at the public hearing, as the Administrative Law Judge is allowing the City and CN to work together on a proposed solution, subject to OCR approval. o CN has presented a proposal to staff combining the closure of Wood Street (in lieu of Park Street) where the existing signals at Wood Street would be relocated to Patch Street. Any such proposal would be subject to OCR approval. Page 3 of 11 s t e v e n s p o i n t . c o m • WisDOT HWY 66/HWY 10 Improvements: o Staff is working with WisDOT, as they are planning several improvement projects for the Highway 66 and Highway 10 corridors through Stevens Point over the next few years. ▪ In 2027, they are planning to complete a curb ramp replacement project through both corridors. This project is intended to improve the pedestrian environment by ensuring that curb ramps are ADA-compliant. ▪ In 2028, they are planning to complete a joint repair project on Highway 10. ▪ In 2030, they are planning to complete a pavement replacement project on Highway 66 from the west City Limits to the CN Railroad crossing. ▪ In 2031, they are planning to complete a pavement overlay of Highway 66 between Frontenac Avenue and Country Club Drive. ▪ In 2032, they are planning to complete a pavement replacement project on Highway 66 between West Karner Street and the bridge over the Wisconsin River. ➢ The overall WisDOT pavement replacement project does extend through downtown to Division Street; however, City staff and WisDOT regional staff are reviewing the City’s conceptual plan for two-waying between Division Street and the bridge over the Wisconsin River. WisDOT regional staff have stated that they are supportive of the City’s consideration of two-waying the downtown and are willing to work with the City to achieve this goal if that is the City’s intent. • Additional Miscellaneous Projects: o Engineering staff continues working on proposed 2026, 2027, and 2028 roadway projects, including gathering survey data, researching right-of-way, and preparing bidding documents. o Engineering staff have been working with university staff on several fronts to improve the University environment. These include: ▪ Discussions in conjunction with Community Development on the future of the old Maytag lot. ▪ Discussions regarding the reconstruction of Fourth Avenue through campus, which is tentatively scheduled for reconstruction in 2028. o Staff continues to work with the Utility Department on various water, sanitary, stormwater, and fiber projects. o Staff continues to work with the Community Development Department on various projects. These projects include: ▪ Shopko redevelopment. ▪ Convent redevelopment. STREETS SUPERINTENDENT Chris Johnson 2. Streets Division • Continued Operations: o Garbage and Recycling o Street Sign Compliance and replacement o Street Light Maintenance o Street Patching/Trumbull o Drop-off Site Operations Page 4 of 11 s t e v e n s p o i n t . c o m • Staffing: o Both vacant positions, Fleet Mechanic and Streets Maintenance Worker, have been filled, with both individuals scheduled to begin the second week of November. One is transferring from another City department, while the other is a returning employee. o In October, our Drop-Off Attendant resigned for a full-time employment opportunity. We are currently accepting applications, but in the meantime, current staff is covering the position to maintain operations. • Summer Crews: o All crews have transitioned back to the standard schedule of five 8-hour workdays per week. o Crews will continue completing remaining summer projects as weather permits, transitioning to winter operations as weather requires. ▪ Concrete: ➢ Most concrete work has been completed for the 2026 season. Crews will continue addressing small utility patches and other project-related repairs as needed. ▪ Paving: ➢ Paving operations are largely completed for this year. Crews finished utility patches and pavement repairs associated with the fall mill and overlay projects. Crews will remain available for additional repairs as needed until the asphalt plants close for the season. ▪ Patching: ➢ Mastic operations have been largely paused due to leaf collection. Crews hope to complete remaining work on Water and Stanley Streets before resuming citywide patching efforts in preparation for winter. ▪ Painting: ➢ Crews completed long-line pavement marking in August and October. All painting operations are complete for this year. ▪ Crack Filling: ➢ Crews have completed the 2026 crack fill program. • Fall Leaf Collection: o Crews began leaf collection in the last week of October, with collection expected to take approximately two weeks. Once completed, crews will process and haul the leaves to various disposal sites, including local farms and composting facilities. • Street Sweeping: o Two sweeping crews began operating on day and night shifts during the week of November 2, following leaf collection activities. The additional coverage will allow crews to complete one final citywide sweep before the end of the year. • Equipment Maintenance/Garage: o Despite operating with one less mechanic since May, garage staff have done an excellent job maintaining equipment and preparing for winter. All winter equipment is ready for the season, with the exception of a new style plow blade that crews plan to test this year. Page 5 of 11 s t e v e n s p o i n t . c o m November 4, 2026 To: Board of Public Works From: Scott Beduhn, Director of Public Works Re: Ordinance Amendment The ordinance amendment to Chapter 16, Section 16.15, creating Right of Way, Boulevards and Swales, is the result of staff’s ongoing effort to address the increasing number of private plantings within the public right of way. The attached ordinance language reflects the collaborative efforts of Community Development, Forestry, and Public Works, along with input from the public and alderpersons and is intended to establish some basic rules for plantings within the right of way. If you have any questions, please don't hesitate to contact me. Thank you, City of Stevens Point 1515 Strongs Avenue Stevens Point, WI 54481 Public Works Engineering Department: Phone: 715-346-1561 Fax: 715-346-1650 Streets Department: Phone: 715-346-1537 Fax: 715-346-1687 Page 6 of 11 ORDINANCE AMENDING THE REVISED MUNICIPAL CODE OF THE CITY OF STEVENS POINT, WISCONSIN The Common Council of the City of Stevens Point do ordain as follows: SECTION I: That Chapter 16, Section 16.15 of the Revised Municipal Code, Right of Way, Boulevards and Swales is hereby created to read as follows: 16.15 1) Definitions: As used in this ordinance, or where terms are not defined in chapters 11, 13, 21 and 23 of the City of Stevens Point Revised Municipal Codes, such terms shall have the meanings ascribed to them in a standard dictionary, unless the context otherwise indicates, the following definitions apply: a) “Noxious weeds” and " invasive plants” shall mean any plant so defined in Chapter 21 of the City of Stevens Point Revised Municipal Codes. b) “Swale” – shall mean a created vegetated depression designed to retain and/or convey stormwater for the purpose of natural infiltration, flood reduction, and erosion control. This is considered part of the City’s stormwater management infrastructure, lying between the property line and the edge of the roadway, where no curb exists. c) “Boulevard also known as a Terrace” – shall mean the public right of way lying between the property line and sidewalk, and between the sidewalk and the edge of curb, or where no sidewalk or swale exists, between the property line and the edge of the public roadway. 2) Plantings Permitted within the Boulevard, Swales or Undeveloped Right of Way Areas: a) A property owner in the City shall be permitted to plant, care for, and maintain gardens within the Boulevard or undeveloped right of way areas adjacent to their property, subject to the restrictions set forth below: 1) All plantings and/or seeded gardens such as native or turf grasses may be planted up to the sidewalk, curb, or shoulder, provided they are maintained and do not encroach or overhang onto the adjacent sidewalk, curb, or street. Page 7 of 11 2) No plantings or associated work may cause damage to an existing street tree roots located within the Boulevard. Soil levels shall not be altered to the extent where they exceed the height of either sidewalk or curb, if present. Any tree planting or excessive soil disturbance work within the dripline of existing boulevard trees shall require prior approval of the City Forestry Department. 3) Plantings may include flowers, native plants, herbs or turf grasses, and other decorative plants, but in no event shall any invasive plant or noxious weed be allowed. 4) Plantings which may create and/or are deemed to be a nuisance are prohibited within the public sidewalk or street, such as those with thorns, spines, or sharp-edged appendages. 5) Terrace Plantings Restriction Zones indicated on attached Exhibit A map. b) A property owner in the City shall be permitted to plant, care for, and maintain plants within the swales adjacent to their property, subject to the restrictions set forth below: 1) No changes to the established grades are allowed. Depth or grade of swales cannot be altered. Plants or plant types may not impede the intended function of the swale. 2) Stone (such as river rock or similar aggregate material) may not be used. Mulch may not be used within swales but is permissible in other areas. Rocks, boulders and structures such as retaining walls, planters, raised garden beds, fences and steps are prohibited. 3) Woody vegetation or a terrace garden may not be planted within any stormwater management feature intended to convey water such as roadside ditches. c) The property owner shall be solely responsible for the maintenance of the terrace garden or swale. Maintenance at a minimum shall include: 1) Removal of noxious weeds or invasive plants. Page 8 of 11 2) Removal of all woody plants from swale areas except for approved street trees. Swales must be mowed no less than annually to prevent the establishment of trees, bushes, and shrubs, or as otherwise dictated under stormwater Best Management Practices. 3) Removal of accumulated sediment. 4) Removal of trash, leaves, grass clippings, or other debris. 5) Repairing areas of bare soil or erosion. 6) Removal of any plant material, soil, mulch, or stone from the sidewalk, curb and gutter, or roadway inclusive of any paved or gravel shoulder. d) A permit shall not be required for a terrace garden which complies with the standards within this ordinance; a constructed raised bed garden within the boulevard, if allowed, would require a permit. 3) Public Works and Utilities: a) Notwithstanding the foregoing, all such boulevards remain public property and subject to the right of the City and private utility companies to perform necessary work, to plant, trim and otherwise maintain trees, to access utilities and store excess snow. In the event the City disturbs terrace plantings or gardens in the course of such work, it shall restore the terrace to a grassy state. In no event shall the City or private utility company be liable for any damage to, disruption of, or removal of plantings, either direct or indirect, as a result of the City or private utility company, their employees, agents or contractors performing any installation, maintenance or repairs. Further, the City shall have the right to remove or restrict any plantings that are deemed to be a public nuisance or interfere with the safety of pedestrians and motorists, without notice. 4) Violations: a) If the Code Official determines that circumstances warrant code enforcement and/or abatement, the property owner shall be notified and given 30 days to correct the violation. If the property owner does not correct the violation(s) within 30 days, the City will take corrective action (abate) and bill the owner for all related costs. The cost of abatement shall be collected from the owner, including all applicable service fees being assessed against the real estate as a special Page 9 of 11 charge. Failure to pay any of these related charges within thirty (30) days will result in the charges being transferred onto the tax roll as a special charge against said property pursuant to the provisions of Section 66.0627 of the Wisconsin Statutes for collection and settlement under Chapter 74 of the Wisconsin Statutes. SECTION II: This ordinance change shall take effect upon passage and publication: Approved: Mike Wiza, Mayor Attest: Susan Pagel, City Clerk Dated: November 4, 2026 Approved: November 16, 2026 Published: November 27, 2026 Page 10 of 11 Page 11 of 11

Source: City of Stevens Point website. First collected Nov 6, 2026.