RecordWell Data

City Plan Commission — Agenda Packet

City of Stevens Point · Portage County · City Plan Commission · meeting of Nov 3, 2025 · Agenda packets

Open the original document More from City of Stevens Point

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Our intention is to have in-person meetings going forward. For the time being, we will hold the City Committee Meetings, Plan Commission, Council and most others at the Community Room at 933 Michigan Avenue. This in-person location will meet the legal requirement for our open meetings. We will have a virtual option available, but the technology for the hybrid style meeting may not be reliable all of the time. AGENDA CITY PLAN COMMISSION Members • Mayor Wiza • Alderperson Kneebone • Commissioner Arntsen • Commissioner Beacom • Commissioner Rice • Commissioner Schuler Date and Time: November 3, 2025 6:00 PM Location: Community Room 933 Michigan Avenue, Stevens Point, WI OR Zoom Teleconferencing Meeting ID: 863 9687 4563 Passcode: 225205 By Computer: https://us02web.zoom.us/j/86396874563?pwd=QcNYTakzK6PLkbL74b By Phone: +1-312-626-6799 (US Chicago) Opening Section: 1. Roll Call Discussion and Possible Action on: 2. Report of the October 6, October 8, & October 21, 2025 meetings of the City Plan Commission. 3. Public Hearing and action on a request from Dustin Haugen for a conditional use permit to construct an accessory structure on the property located at 1208 Wisconsin Street (Parcel ID 281240832400814) utilizing “R-TND” Traditional Neighborhood Overlay District setback requirements, consistent with Ch. 23.02(1)(h)(3). 4. Public Hearing and action on a request from Thomas Bushman for a conditional use permit to operate a single-family residence on the property located at 2877 Church Street (Parcel ID 281230805101713), consistent with Ch. 23.02(2)(a)(3)(d). 5. Public Hearing and action on a request from Jim Lundberg, representing Point Crossing LLC, for a conditional use permit to construct multiple multi-family residential buildings on an unaddressed parcel bounded by Songbird Lane (Parcel ID 281240836220063), consistent with Ch. 23.01(14)(f) & Ch. 23.02(1)(f)(3)(b). 6. A request from Jim Lundberg, representing Point Crossing LLC, for a site plan review to construct multiple multi-family residential buildings on an unaddressed parcel bounded by Page 1 of 80 Songbird Lane (Parcel ID 281240836220063), consistent with Ch. 23.02(2)(e)(5). 7. Zoning Code Rewrite - First Review of Draft General Provisions. 8. A request from Wisconsin Public Service for a Utility Easement along Water Street. 9. A request from Green Tree Companies to purchase lots 29 and 30 in the Forest Creek Subdivision and combine them for the purpose of constructing a single-family home. 10. Director's Report. Closing Section: 11. Adjourn PLEASE TAKE NOTICE that any person who has special needs while attending these meetings or needs agenda materials for these meetings should contact the City Clerk as soon as possible to ensure that a reasonable accommodation can be made. The City Clerk can be reached by telephone at (715) 346-1569 or by mail at 1515 Strongs Avenue, Stevens Point, WI 54481. Maps further defining the above area(s) may be obtained from the City of Stevens Point Department of Community Development, 1515 Strongs Avenue, Stevens Point, WI 54481, or by calling (715) 346-1567, during normal business hours. PLEASE TAKE FURTHER NOTICE that a quorum of the Common Council may be in attendance at this meeting. Page 2 of 80 Our intention is to have in-person meetings going forward. For the time being, we will hold the City Committee Meetings, Plan Commission, Council and most others at the Community Room at 933 Michigan Avenue. This in-person location will meet the legal requirement for our open meetings. We will have a virtual option available, but the technology for the hybrid style meeting may not be reliable all of the time. MINUTES CITY PLAN COMMISSION Members • Mayor Wiza • Alderperson Kneebone • Commissioner Arntsen • Commissioner Beacom • Commissioner Miskowiak • Commissioner Rice • Commissioner Schuler Date and Time: October 6, 2025 6:00 PM Location: Community Room 933 Michigan Avenue, Stevens Point, WI OR Zoom Teleconferencing Meeting ID: 815 5922 1570 Passcode: 128498 By Computer: https://us02web.zoom.us/j/81559221570?pwd=loLehx6Dbnj0NnbGCbi By Phone: +1-312-626-6799 (US Chicago) Opening Section: 1. Roll Call • Meeting called to order at 6:00PM. • Members Present: Mayor Wiza, Alder Kneebone, Commissioners Arntsen, Beacom, Miskowiak, Rice, Schuler Discussion and Possible Action on: 2. Report of the September 2, 2025 meeting of the City Plan Commission. • Background: Report of the September 2, 2025 meeting of the City Plan Commission is included in the agenda packet. • Motion: Arntsen moves approval of the Report of the September 2, 2025 meeting of the City Plan Commission. • Second: Kneebone seconds. • Discussion: None. • Vote: Unanimous approval. 3. Public Hearing and action on a request from the City of Stevens Point to amend Chapter 23, Zoning Ordinance, of the Revised Municipal Code of the City of Stevens Point. Said request amends Section 23.02(4)(e) establishing groundwater protection zones for municipal well #12. Page 3 of 80 • Background: Director Lemke provides an explanation of the ordinance amendment and need for it. • Public Hearing: No public testimony heard. • Motion: Arntsen moves approval of the amendment as presented. • Second: Beacom seconds. • Discussion: No further discussion. • Vote: Unanimous approval. 4. A request from Tyler Ignatowski, representing Little Captain LLC, to annex an unaddressed parcel bounded by Stanley Street (Parcel ID 020240828-14.18) from the Town of Hull to the City of Stevens Point. • Background: Associate Planner & Zoning Administrator Kuhn provides a background of the annexation request. Staff recommendation is to approve the request. • Motion: Arntsen moves approval of the annexation request as presented. • Second: Miskowiak seconds. • Discussion: o Rice inquires about the previous work history of the applicant. o Alder Morrow, District 11, speaks on the proposed development. • Vote: Unanimous approval. 5. Staff Update: Zoning Code Rewrite. • Background: Kuhn provides a verbal update of the zoning code rewrite, summarizing the final steps of the public engagement phase for the rewrite. • Discussion: o Schuler asks about staff satisfaction with public engagement in the process. 6. Director's Report. • Background: Director Kivela provides a verbal report. Closing Section: 7. Adjourn • Meeting adjourned at 6:23PM. PLEASE TAKE NOTICE that any person who has special needs while attending these meetings or needs agenda materials for these meetings should contact the City Clerk as soon as possible to ensure that a reasonable accommodation can be made. The City Clerk can be reached by telephone at (715) 346-1569 or by mail at 1515 Strongs Avenue, Stevens Point, WI 54481. Maps further defining the above area(s) may be obtained from the City of Stevens Point Department of Community Development, 1 515 Strongs Avenue, Stevens Point, WI 54481, or by calling (715) 346-1567, during normal business hours. PLEASE TAKE FURTHER NOTICE that a quorum of the Common Council may be in attendance at this meeting. Page 4 of 80 Page 5 of 80 Our intention is to have in-person meetings going forward. For the time being, we will hold the City Committee Meetings, Plan Commission, Council and most others at the Community Room at 933 Michigan Avenue. This in-person location will meet the legal requirement for our open meetings. We will have a virtual option available, but the technology for the hybrid style meeting may not be reliable all of the time. MINUTES CITY PLAN COMMISSION Members • Mayor Wiza • Alderperson Kneebone • Commissioner Arntsen • Commissioner Beacom • Commissioner Miskowiak • Commissioner Rice • Commissioner Schuler Date and Time : Octob er 8, 2025 6:00 PM Locatio n: Community Room 933 Michigan Avenue, Stevens Point, WI OR Zoom Teleconferencing Meeting ID: 890 0020 0557 | Passcode: 250080 By Computer: https://us02web.zoom.us/j/89000200557?pwd=bbu7dEEJkVoofUWzaMDdb AIGafL6T3.1 By Phone: +1-312-626-6799 (US Chicago) Opening Section: 1. Roll Call • Meeting called to order at 6:00PM. • Members Present: Mayor Wiza, Alder Kneebone, Commissioners Arntsen, Beacom, Rice, Schuler. • Members Excused: Commissioner Miskowiak. Discussion and Possible Action on: 1. Review of Comprehensive Plan Chapter 2: Natural, Agricultural, and Cultural Resources and recommendation to Common Council. • Background: Sam Wessel, North Central Wisconsin Regional Plan Commission, and Chris Klesmith, Neighborhood Planner, provide an overview of the amendments to Comprehensive Plan Chapter 2 and recommendations provided by community members. • Discussion: o Recommendations for Chapter 2 are provided by Commissioners Schuler, Beacom, Alder Kneebone, Mayor Wiza; Commissioners request additional discussion on Goals, Objectives, and Policies and a comparison of the conclusions between the former comprehensive plan and current draft. o • Motion: Page 6 of 80 o No action is taken. 2. Review of Comprehensive Plan Chapter 4: Utilities and Community Facilities and recommendation to Common Council. • Background: Wessel and Klesmith provide a review of amendments to Comprehensive Plan Chapter 4. • Discussion: o Recommendations and amendments for Comprehensive Plan Chapter 4 are provided by Commissioners Schuler, Mayor Wiza, Alder Kneebone,. Commissioners request additional information regarding the City facilities planning early in the Chapter and a similar comparison that was requested for Chapter 2. • Motion: o No action is taken. 3. Review of draft Comprehensive Plan Chapter 3: Housing. • Background: Wessel and Klesmith provide an overview of the draft of Comprehensive Plan Chapter 3: Housing. • Discussion: o Requests for clarification and recommendations are heard from Commissioners Beacom, Schuler, Arntsen, and Mayor Wiza regarding the housing affordability analysis and associated figures, and to revisit the explanation of how the City should be responding to the data. Further comments are received on owner and renter rates, and housing solutions, including rationale for tax incremental financing. Further comments are heard on the chapter’s Goals, Objectives, and Policies. • Motion: o No action is taken. Closing Section: 1. Adjournment • Meeting adjourned at 7:32PM. PLEASE TAKE NOTICE that any person who has special needs while attending these meetings or needs agenda materials for these meetings should contact the City Clerk as soon as possible to ensure that a reasonable accommodation can be made. The City Clerk can be reached by telephone at (715) 346-1569 or by mail at 1515 Strongs Avenue, Stevens Point, WI 54481. Maps further defining the above area(s) may be obtained from the City of Stevens Point Department of Community Development, 1515 Strongs Avenue, Stevens Point, WI 54481, or by calling (715) 346-1567, during normal business hours. PLEASE TAKE FURTHER NOTICE that a quorum of the Common Council may be in attendance at this meeting. Page 7 of 80 Page 8 of 80 Page 1 of 2 REPORT OF THE CITY PLAN COMMISSION October 21, 2025 – 6:00 PM 933 Michigan Ave, Stevens Point, WI 54481 PRESENT: Alderperson Kneebone, Commissioner Arntsen, Commissioner Beacom, Commissioner Rice, Commissioner Schuler EXCUSED: Mayor Wiza, Commissioner Miskowiak ALSO PRESENT: Associate Planner / Zoning Administrator Kuhn, Community Development Director Kivela, Planning Intern Sager INDEX: Opening Section: 1. Roll Call Discussion and Possible Action on the Following: 2. Presentation and discussion on the preliminary policy direction report for the Zoning Code rewrite. 3. Discussion on project schedule – draft and refinement stage of the Zoning Code rewrite. 4. First review of draft purpose statements – Zoning, Sign, & Subdivision Ordinances. Closing Section: 5. Adjourn Opening Section: 1. Roll Call Present: Kneebone, Arntsen, Beacom, Rice, Schuler Excused: Wiza, Miskowiak Discussion and Possible Action on the Following: 2. Presentation and discussion on the preliminary policy direction report for the Zoning Code rewrite. Associate Planner / Zoning Administrator Kuhn presented the purpose of the preliminary policy direction report, noting that its overall goals are to identify broad policy areas for consideration when performing the rewrite and to remain aligned with the 2005 Comprehensive Plan and the feedback collected through various community engagement venues. Kuhn then invited the Commission to review and refine the preliminary recommendations, which are organized into the following topics, as outlined below: 1. Housing 2. Transportation 3. Natural, Environmental, and Ecological Resource Protection 4. Site Design 5. Zoning Map Page 9 of 80 Page 2 of 2 6. Signage and Subdivision Regulations 7. Miscellaneous Recommendations 8. Areas Where Direction is Needed No action was taken. 3. Discussion on project schedule – draft and refinement stage of the Zoning Code rewrite. Associate Planner / Zoning Administrator Kuhn stated that, following the completion of the initial public engagement phase, the next stage of the rewrite will comprise of drafting and refining ordinance sections. Kuhn noted that the draft ordinance sections will be reviewed sequentially, with the overall timeline remaining flexible determined by the pace and completion of prior section revisions. Kuhn encouraged the Commission, when prompted, to diligently review and provide recommendations for the drafts to support the development of the most optimal result. No action was taken. 4. First review of draft purpose statements – Zoning, Sign, & Subdivision Ordinances. Associate Planner / Zoning Administrator Kuhn shared the first draft ordinance section which included the purpose statements for the Zoning, Sign, and Subdivision Ordinances. These draft purpose statements were completely rewritten from the existing code to achieve the following, as outlined below: • Enhance visual appeal • Eliminate redundancy • Eliminate statement areas where the City is statutorily obligated to fulfill Kuhn then opened the discussion to the Commission to provide revisions and recommendations to strength the draft purpose statements. No action was taken. Closing Section: 5. Adjourn Meeting adjourned at 8:18 PM. A recording of this meeting can be viewed/heard at: https://stevenspoint.com/365/AgendasMinutesVideos Page 10 of 80 Page 1 of 7 Administrative Staff Report Department of Community Development Construct an Accessory Structure Using Traditional Neighborhood Setbacks 1208 Wisconsin Street November 3, 2025 Applicant(s): • Dustin Haugen Staff: • Adam Kuhn, Associate Planner akuhn@stevenspoint.com Parcel Number(s): • 281240832400814 Zone(s): • “R-3” Single- and Two-Family Residential Master Plan: • Residential Council District: • District 9 | Ald. Lang Lot Information: • Frontage: 50.25 ft. • Depth: 70 ft. • Lot Size: 3,517 sq. ft. (0.08 ac.) Current Use: • Single-family residence Applicable Regulations: • 23.02(1)(h)(3) Request 1. Public Hearing and action on a request from Dustin Haugen for a conditional use permit to construct an accessory structure on the property located at 1208 Wisconsin Street (Parcel ID 281240832400814) utilizing “R-TND” Traditional Neighborhood Overlay District setback requirements, consistent with Ch. 23.02(1)(h)(3). Attachment(s) 1. Application 2. Plans Findings of Fact 1. The applicant is requesting to construct an accessory structure on the northwest corner of the subject property. 2. Detached garages are required to have a minimum three-foot side yard and rear yard setback provided that the garage is set back at least ten feet from the principal structure on the subject property and does not exceed 15 feet in height. 3. A one-foot setback from the west and north lot lines is requested. 4. The subject property is located within the “R-TND” Traditional Neighborhood Overlay District. The “R-TND” District allows, via a conditional use permit, lesser setback requirements to construct detached garages. 5. The Plan Commission and Common Council may attach additional conditions onto this request as necessary. Staff Recommendation Approve the request for a conditional use permit to construct an accessory structure using setback requirements of the “R-TND” Traditional Neighborhood Overlay District for the property located at 1208 Wisconsin Street (Parcel ID 281240832400814), subject to the following conditions: 1. A building permit shall be obtained prior to the start of construction. 2. Staff shall have the ability to approve minor amendments to the proposed project plan. Page 11 of 80 Page 2 of 7 Vicinity Map Background Overview: The applicant is requesting a conditional use permit to construct an accessory structure near the northwest corner of the subject property. The construction of accessory structures is required to meet the principal structure setback requirements for the zoning designation of the property for which the structure is proposed to be located. With that said, the City’s Zoning Code provides modified setback requirements for accessory structures for all zoning districts. Section 23.01(10) of the City’s Zoning Code allows a minimum three-foot side and rear setback for an accessory building provided that 1.) the structure is separated at least ten feet from the principal structure that is located on the property and 2.) that the height of the structure does not exceed 15 feet. The subject property is located within the “R-TND” Traditional Neighborhood Overlay District. The “R-TND” Overlay District, created in the early-2000s as a result of then-newly adopted comprehensive planning and smart growth legislation in Wisconsin, is intended to allow for the development and redevelopment of land consistent with design principles found within a specific traditional neighborhood. For properties within the “R-TND” District, lesser setbacks are available, via a conditional use permit, to construct an accessory structure. Said conditional use setback requirements are found below. Ch. 23.02(1)(h)(3) Conditional Use Setback Requirements Detached Garage • Street front setback – 20 feet • Corner side yard – 12 feet, with no access to a public street • Interior side yard – 1 foot • Rear yard – 1 foot Page 12 of 80 Page 3 of 7 The applicant is requesting a one-foot setback from the north and west lot lines. As the subject property is located within the “R-TND” District, a conditional use permit is required to allow for the requested setback. An analysis of this request relative to the City’s fourteen standards for reviewing a conditional use request are outlined below. Standards of Review – Conditional Use Permit 1. The establishment, maintenance, or operation of the use will not be detrimental to, or endanger the public health, safety, morals, comfort, or general welfare. Analysis: The proposed use is consistent with the City’s Comprehensive Plan and the existing surrounding uses are unlikely to be negatively impacted by this request. The proposed accessory structure is customary for residential uses in the city, and its location in the rear yard of the subject property will better shield its visibility from Wisconsin Street. Although the proposed structure is proposed to have a one-foot side and rear setback, building codes will apply for the construction of this garage to provide additional safeguards to adjacent properties. Findings: The subject property, zoned “R-3” Single- and Two-Family Residential, permits the construction of accessory structures so long as the cumulative size of all structures on the property do not exceed 900 square feet. Staff does not believe the proposed conditional use permit with the conditions outlined above would be detrimental to, or endanger the public health, safety, morals, comfort, or general welfare. 2. The use will not be injurious to the use and for the purpose already permitted, nor substantially diminish and impair property values. Analysis: The construction of an accessory structure is permitted on the subject property so long as the size and location standards found within the Zoning Code are met. Findings: Single- and two-family residential uses surround the subject property, most with their own accessory structures. Staff believes that the construction of an accessory structure would not be contrary to uses allowed within the “R-3” District. 3. The establishment of the use will not impede the normal and orderly development and improvement of the surrounding property for uses permitted in the district. Analysis: The respective area is in an established and developed area of the city. The City’s Comprehensive Plan identifies this area for residential uses (i.e., single-family and two-family residential uses). “R-TND” Traditional Neighborhood Overlay District Page 13 of 80 Page 4 of 7 Findings: See standards one and two above. The applicant’s proposal will not impede on the normal and orderly development and improvement of the surrounding area. 4. The exterior architectural appeal and function plan of any proposed structure will not be variance with either the exterior architectural appeal and function plan, and scale of the structures already constructed or in the course of construction in the immediate neighborhood or in the character of the applicable district so as to result in a substantial or undue adverse effect on the neighborhood. Analysis: The applicant is planning to utilize the same siding material on the accessory structure as what exists on the house. An overhead door is proposed on the front elevation of the structure, while windows are planned along the side elevations. Dormer windows are being consider, however are not finalized at this time. Findings: Staff believes that this standard is met. The purpose of the “R-TND” District, in part, is to ensure that street elevations on primary and accessory buildings does not consist of a blank wall, but rather architectural elements such as doors and windows. By having an overhead door, along with a variety of exterior wall materials and an improved fenestration pattern, staff believes that the appearance of this structure will be similar to garages constructed on other residential lots in the city. 5. Adequate utilities, access roads, drainage and/or facilities have been, or are being, provided. Analysis: Utility connections are not planned as part of this development. If needed in the future, appropriate connections exist off of Wisconsin Street. Access to the proposed garage will be via an existing driveway located off of Wisconsin Street. Given the reduced size allowed for accessory structures on the subject property (plus or minus 200 sq ft), drainage issues are not anticipated that warrants additional stormwater controls on the subject property. Findings: Staff believes that this standard is met. 6. Adequate measures have been, or will be taken, to provide ingress and egress so designed to minimize traffic congestion in the public streets. Analysis: The proposed use will be serviced by an existing driveway off of Wisconsin Street. Findings: Staff believes that access is appropriate and is not anticipated to incur additional traffic congestion on Wisconsin Street. Page 14 of 80 Page 5 of 7 7. The proposed use is not contrary to the objectives of any duly adopted land use plan for the City of Stevens Point and any of its components. Analysis: The City’s 2005 Comprehensive Plan Future Land Use Map has identified the subject property for residential (i.e., single- and two-family) uses. The subject property is zoned “R-3” Single- and Two-Family Residential. According to the City’s Zoning Code, the intent of the “R-3” District is to “provide for both single- family residences and two-family residences intended particularly to act as a transition district between lower intensity uses such as permitted in "C", "R-1" and "R-2" districts and higher intensity districts, consistent with the City's Comprehensive Plan. This district is intended to be provided for all lands where sewer and water is or will be required.” Findings: Staff believes that this request meets the intent of the “R-3” District as garages are intended to support single- and two-family residential living. 8. The use shall, in all other respects, conform to the applicable regulations of the district in which it is located, except as such regulations may, in each instance, be modified pursuant to the recommendations of the Plan Commission. Analysis: This conditional use request is seeking to construct an accessory structure with a one-foot setback side and rear setback. Findings: The regulations of the district are met provided that the above permit conditions are fulfilled. Subject Property Subject Property Page 15 of 80 Page 6 of 7 9. The proposal will not result in result in an over-concentration of high-density living facilities in one area so as to result in a substantial or undue adverse effect on the neighborhood, on the school system, and the social and protective systems of the community. Analysis: N/A Findings: N/A 10. Access to the site shall be safe. Analysis: Vehicular and pedestrian access to the site is off of Wisconsin Street. Findings: As additional traffic is not anticipated as part of constructing this accessory structure, staff believes that access to the property is appropriate. 12. There shall be adequate utilities to serve the site. a. The Public Works Director, Police Chief and Fire Chief shall determine whether there is adequate sanitary sewer, portable water, storm drainage, street capacity, emergency access, public protection services, and other utilities to serve the proposed development. They shall review the plan to ensure safety and access for safety vehicles. Analysis: While utility connections for the subject property exists off of Wisconsin Street, access to utility infrastructure is not proposed as part of the proposed development. Findings: This standard is met. 13. The privacy of the neighboring development and the proposed development shall be maintained as much as practical. Guidelines: a. Mechanical equipment including refuse storage shall be screened from neighboring properties. Analysis: Mechanical equipment is not proposed as part of this proposed use. Findings: This standard is met. b. Lighting shall be located to minimize intrusion onto neighboring properties. Analysis: While exterior light fixtures are proposed on the garage’s south-facing wall, the setback provided from Wisconsin Street should minimize light pollution onto the public right-of-way. Findings: This standard is met. c. Sources of noise shall be located in a manner that minimizes impact to neighboring properties. Analysis: The use will be operating within the confines of the building and property. Findings: The use should not create excessive noise. Page 16 of 80 Page 7 of 7 14. Principal – Applications for exclusive multi-family residential uses. Landscaping shall be provided, or existing landscape elements shall be preserved to maintain a sense of residential character, define boundaries, and to enhance the sense of enclosure and privacy. Analysis: N/A Findings: N/A Based on the findings above, staff would recommend approval of the conditional use permit with the conditions outlined on page one. Please keep in mind that State legislation has placed limitations on local jurisdictions regarding the denial of conditional use permits. Conditional use permits shall be reviewed by a means to permit a use under certain conditions applied to the use or property. For example, if a concern is raised regarding to a standard above, a condition can be applied to the permit to address the concern and grant the permit. Page 17 of 80 Page 18 of 80 Legal Description of Subject Property Designated Future Land Use Category Current Use of Property Residential, Home Explain the land use and the development proposed for the subject property. Include the time schedule (if any) for development. (Use additional pages if necessary) Garage: Designed to accommodate the small sized property. Fence: enclosing the property to safely allow children and pet to play. Driveway: Property currently has a gravel drive. We would like to make that a hard surface for clean and safe movement from car to home, etc. How will the proposed development reinforce the existing or planned character of the neighborhood? (Use additional pages if necessary) Application for a Conditional Use Permit Page 1 of 2 We purchased this home because we are avid lovers of historic homes. This 1925 Craftsman style home is very appealing to us. So much so, we hope to bring back some of the original trims and treatments to make a warm and welcoming home. The design of the enhancements are directly influenced by the craftsman style. Outline steps that will be taken to reduce any negative impacts on adjacent property. (Use additional pages if necessary) Pleasing Thought Through Design, Quality Construction, Appropriate Materials, Finish treatments, such as trim/paint, to match the home (which will also be freshly painted), and finally landscaping to visually please and support the comfortable use of the home. As a new family in the neighborhood, we have been warmly welcomed by many neighbors. During these interactions, we have heard numerous stories expressing frustration with past ownership of the property. Neighbors disliked the negative use. Apparently there were cars on blocks, trash piled along thee edges of the property, odors from human, and animal activities wafting from the home/property. And finally, the general appearance; overgrown and uncared for landscaping, etc. We hope to vastly improve and ultimately eliminate concerns by making the home beautiful with much curb appeal. Current Zoning Surrounding Subject Property North: South: East: West: Current Land Use Surrounding Subject Property North: South: East: West: Page 19 of 80 EXHIBITS Owner Information Sheet Additional Exhibits If Any: Letter to District Alderperson Maps (vicinity, zoning, floodplains, wetlands others as requested by staff) Site Plan (designating primary, side, and service street frontages) X Building Elevations Parking Plan (Location, number of spaces, reductions, and design and landscaping) X Street Plan with Cross-sections Utility Plan Landscape Plan (including any equivalent alternative landscaping requests) Stormwater Plan Outdoor Lighting Plan (location of fixtures, illumination levels) CERTIFICATION AND SIGNATURE By my signature below, I certify that the information contained in this application is true and correct to the best of my knowledge at the time of the application. I acknowledge that I understand and have complied with all of the submittal requirements and procedures and that this application is a complete application submittal. I further understand that an incomplete application submittal may cause my application to be deferred to the next posted deadline date. Signature of Applicant Date Signature of Property Owner(s) Date Dustin Haugen + Kristina Sneshkoff 10/09/2025 DJ Haugen Krissy Sneshkoff 10/09/2025 Application for a Conditional Use Permit Page 2 of 2 Page 20 of 80 Page 1 of 6 Administrative Staff Report Department of Community Development Operate a One-Unit Residence 2877 Church Street November 3, 2025 Applicant(s): • Thomas Bushman Staff: • Adam Kuhn, Associate Planner akuhn@stevenspoint.com Parcel Number(s): • 281230805101713 Zone(s): • “B-4” Commercial Master Plan: • Commercial / Office / Multi- Family Council District: • District 5 | Ald. Birr Lot Information: • Frontage: 197 ft. • Depth: 121 ft. • Lot Size: 13,365 sq. ft. (13,365 ac.) Current Use: • Residential and office Applicable Regulations: • 23.02(2)(a)(3)(d) Request 1. Public Hearing and action on a request from Thomas Bushman for a conditional use permit to operate a single-family residence on the property located at 2877 Church Street (Parcel ID 281230805101713), consistent with Ch. 23.02(2)(a)(3)(d). Attachment(s) 1. Application Findings of Fact 1. The subject property is home to an office space on the main level, along with multiple residential units within the main level and basement. 2. The subject property is zoned “B-4” Commercial. Within the “B-4” District, office spaces are a permitted use and any residential units are a conditional use. According to archival records, a conditional use was not granted for the residential use – an item that was required decades ago. Code enforcement action began with the Building Inspection Division, and the applicant is now wishing to create one residential unit in the building. 3. The applicant is interested in occupying this one-unit residence. In order for that to occur, a conditional use permit would need to be granted. 4. The Plan Commission and Common Council may attach conditions onto this request as necessary. Staff Recommendation Approve the conditional use permit to operate a one-unit residence on the property located at 2877 Church Street (Parcel ID 281240832402902), subject to the following conditions: 1. The dwelling unit shall meet minimum occupancy and space requirements as outlined in Chapters 21 & 30 of the City’s Municipal Code of Ordinances. 2. Staff shall have the ability to approve minor deviations to the project plan. Page 21 of 80 Page 2 of 6 Vicinity Map Background Overview: The applicant is requesting a conditional use permit to occupy a one-unit residence on the subject property. The subject property is home to an office space on the main level, along with multiple residential units within the main level and basement. “B-4” Commercial is the zoning designation of the subject property. Within the “B-4” District, office spaces are a permitted use and any residential units are a conditional use. According to archival records, a conditional use was not granted for the residential use – an item that was required decades ago. Code enforcement action began with the Building Inspection Division, and the applicant is now wishing to create one residential unit in the building. The applicant is interested in occupying this one-unit residence. In order for that to occur, a conditional use permit would need to be granted. An analysis of this request relative to the City’s fourteen standards for reviewing a conditional use request are outlined below. Standards of Review – Conditional Use Permit 1. The establishment, maintenance, or operation of the use will not be detrimental to, or endanger the public health, safety, morals, comfort, or general welfare. Page 22 of 80 Page 3 of 6 Analysis: The proposed use is consistent with the City’s Comprehensive Plan and the existing surrounding uses are unlikely to be negatively impacted by this request. The retail store on the main level of the building will still be a predominant land use for the subject property. Located along Church Street, the use of the subject property for both commercial and residential uses is consistent with nearby existing land uses along this street corridor. Adequate utility and road networks exist to compliment this request, with dedicated access off of Church Street. Findings: The “B-4” Commercial District allows for one-unit dwellings as a conditional use. No improvements are proposed to the exterior of the building and to the site to service the proposed use. Staff does not believe the proposed conditional use permit with the conditions outlined above would be detrimental to, or endanger the public health, safety, morals, comfort, or general welfare. 2. The use will not be injurious to the use and for the purpose already permitted, nor substantially diminish and impair property values. Analysis: One-unit dwellings are a conditional use within the “B-4” Commercial District. Findings: Commercial and single-family residential land uses surround the property where it is permitted by right. Staff believes that this proposal would not pose a detriment to the existing residential neighborhood nearby. 3. The establishment of the use will not impede the normal and orderly development and improvement of the surrounding property for uses permitted in the district. Analysis: The respective area is in an established and developed area of the city. The City’s Comprehensive Plan identifies this area for commercial, office and multi-family residential uses. Findings: See standards one and two above. The applicant’s proposal will not impede on the normal and orderly development and improvement of the surrounding area. 4. The exterior architectural appeal and function plan of any proposed structure will not be variance with either the exterior architectural appeal and function plan, and scale of the structures already constructed or in the course of construction in the immediate neighborhood or in the character of the applicable district so as to result in a substantial or undue adverse effect on the neighborhood. Analysis: The exterior of the building is not proposed to change as part of this request. Findings: Staff believes that the existing building complements both the nearby residential neighborhood to the south and the commercial corridor along Church Street. 5. Adequate utilities, access roads, drainage and/or facilities have been, or are being, provided. Analysis: Utilities exist within the Church Street Right-of-Way that services the proposed use. New connections would not be necessary as the principal structure is already built to accommodate a one-unit residence. Access onto the subject property is off of Church Street. Findings: Staff believes that this standard is met. 6. Adequate measures have been, or will be taken, to provide ingress and egress so designed to minimize traffic congestion in the public streets. Page 23 of 80 Page 4 of 6 Analysis: The proposed use will be serviced by a parking area off of Church Street. Findings: Staff believes that access is appropriate and that the proposed single-family use would not create significant issues with traffic mobility. 7. The proposed use is not contrary to the objectives of any duly adopted land use plan for the City of Stevens Point and any of its components. Analysis: The City’s 2005 Comprehensive Plan Future Land Use Map has identified the subject property for commercial, office and multi-family residential uses. The subject property is zoned “B-4” Commercial. According to the City’s Zoning Code, the intent of the “B-4” District is to “provide for retail, commercial, office, service and apartment uses in areas of good accessibility along arterial streets consistent with the City's Comprehensive Plan. This district is primarily intended to accommodate general commercial uses requiring on-site parking and arterial access.” Findings: Staff believes that this request meets the intent of the “B-4” District as it provides both retail and residential land uses. Given the layout of the principal building, a primary land use of the subject property will be for retail purposes – further meeting the intent to allow for commercial land uses located on an adjacent arterial street (i.e., Church Street). Subject Property Subject Property Page 24 of 80 Page 5 of 6 8. The use shall, in all other respects, conform to the applicable regulations of the district in which it is located, except as such regulations may, in each instance, be modified pursuant to the recommendations of the Plan Commission. Analysis: This conditional use request is seeking to convert multiple nonconforming dwelling units into one housing unit. One-unit residential uses are a conditional use within the “B-4” District. Findings: The regulations of the district are met provided that the above permit conditions are fulfilled. 9. The proposal will not result in result in an over-concentration of high-density living facilities in one area so as to result in a substantial or undue adverse effect on the neighborhood, on the school system, and the social and protective systems of the community. Analysis: One residential unit is proposed to be occupied. The proposed use would provide a similar land use intensity within adjoining properties. Findings: Occupying one housing unit will not result in an over-concentration of high-density living facilities in one area so as to result in a substantial or undue adverse effect on the neighborhood, on the school system, and the social and protective services systems of the community. This standard is met. 10. Principal – Applications for exclusive multi-family residential uses: The view from the street should maintain a residential character. The view should not be dominated by the building and not by garages, parking, mechanical equipment, garbage containers, or other storage. Analysis: N/A Findings: N/A 11. Access to the site shall be safe. Analysis: Vehicular access to the site is off of Church Street. Findings: Based on the low-intensity land use that is being proposed, staff believes that access to the property is appropriate. 12. There shall be adequate utilities to serve the site. a. The Public Works Director, Police Chief and Fire Chief shall determine whether there is adequate sanitary sewer, portable water, storm drainage, street capacity, emergency access, public protection services, and other utilities to serve the proposed development. They shall review the plan to ensure safety and access for safety vehicles. Analysis: Utility connections exist within the Church Street Right-of-Way that services the principal structure on the property. Page 25 of 80 Page 6 of 6 Findings: As no exterior improvements are proposed as part of this request, staff believes that fire access and stormwater controls are sufficient. 13. The privacy of the neighboring development and the proposed development shall be maintained as much as practical. Guidelines: a. Mechanical equipment including refuse storage shall be screened from neighboring properties. Analysis: Mechanical equipment is not proposed as part of this proposed use. Findings: This standard is met. b. Lighting shall be located to minimize intrusion onto neighboring properties. Analysis: Outside of existing light coming from the building, no additional lighting is proposed. Findings: Lighting would be provided by the building. c. Sources of noise shall be located in a manner that minimizes impact to neighboring properties. Analysis: The use will be operating within the confines of the building and property. Findings: The use should not create excessive noise. 14. Principal – Applications for exclusive multi-family residential uses. Landscaping shall be provided, or existing landscape elements shall be preserved to maintain a sense of residential character, define boundaries, and to enhance the sense of enclosure and privacy. Analysis: N/A Findings: N/A Based on the findings above, staff would recommend approval of the conditional use permit with the conditions outlined on page one. Please keep in mind that State legislation has placed limitations on local jurisdictions regarding the denial of conditional use permits. Conditional use permits shall be reviewed by a means to permit a use under certain conditions applied to the use or property. For example, if a concern is raised regarding to a standard above, a condition can be applied to the permit to address the concern and grant the permit. Page 26 of 80 Page 27 of 80 Page 28 of 80 Page 1 of 8 Administrative Staff Report Department of Community Development Construct Multi-Family Buildings Unaddressed Parcel off of Songbird Lane November 3, 2025 Applicant(s): • Jim Lundberg, representing Point Crossing LLC Staff: • Adam Kuhn, Associate Planner akuhn@stevenspoint.com Parcel Number(s): • 281240836220063 Zone(s): • “B-5” Highway Commercial Master Plan: • Commercial/Office/Multi-Family Council District: • District 7 | Ald. Kneebone Lot Information: • Lot Size: 196,463 sq. ft. (4.510 ac.) Current Use: • Undeveloped Applicable Regulations: • 23.01(14)(f) • 23.02(1)(f)(3)(b) Request 1. Public Hearing and action on a request from Jim Lundberg, representing Point Crossing LLC, for a conditional use permit to construct multiple multi-family residential buildings on an unaddressed parcel bounded by Songbird Lane (Parcel ID 281240836220063), consistent with Ch. 23.01(14)(f) & Ch. 23.02(1)(f)(3)(b). 2. A request from Jim Lundberg, representing Point Crossing LLC, for a site plan review to construct multiple multi-family residential buildings on an unaddressed parcel bounded by Songbird Lane (Parcel ID 281240836220063), consistent with Ch. 23.02(2)(e)(5). Attachment(s) 1. Application 2. Plans Findings of Fact 1. The applicant is requesting to construct nine fourplexes on the subject property, along with two six-stall garage complexes. 2. The proposed housing units would be two stories and contain a one- stall attached garage, three bedrooms and two bathrooms. 3. Additional surface parking is provided in front of each attached garage. 4. The subject property is zoned “B-5” Highway Commercial. Within the “B-5” District, multi-family residential development (3+ units) requires a conditional use permit. Additionally, a conditional use permit is required if more than one principal structure is on the same lot. 5. Within the “B-5” District, new construction requires a site plan review due to the area’s adjacency to U.S. Highway 10 East. 6. The Plan Commission and Common Council may attach additional conditions onto this request as necessary. Staff Recommendation Approve the conditional use permit and site plan review to construct multiple multi- family residential buildings on an unaddressed parcel bounded by Songbird Lane (Parcel ID 281240836220063), subject to the following conditions: Page 29 of 80 Page 2 of 8 1. The final landscaping plan shall meet minimum clearview requirements as outlined in Section 23.01(17)(b)(3) of the City’s Zoning Code. 2. The applicant shall submit to the City a wetland delineation report of the subject property. 3. One additional fire hydrant shall be installed, subject to the review and approval of the City Fire Marshal. 4. A maintenance agreement for the additional fire hydrant shall be executed and recorded with the Portage County Register of Deeds Office. 5. Sidewalk shall be installed along the north side of Windy Drive, meeting minimum design standards as required by the City Engineer. 6. An access agreement for utility access shall be executed and recorded with the Portage County Register of Deeds Office. 7. The proposed temporary turnaround shall meet minimum design standards as required by the City Fire Marshal. 8. A building permit shall be obtained prior to the start of construction. 9. Staff shall have the ability to approve minor amendments to the proposed project plan. Vicinity Map Background Overview: The applicant is requesting to construct nine fourplexes on the subject property, along with two six-stall garage complexes. The proposed housing units would be two stories and contain a one-stall attached garage, three bedrooms and two bathrooms. Additional surface parking is provided in front of each attached garage. The subject Page 30 of 80 Page 3 of 8 property is zoned “B-5” Highway Commercial. Within the “B-5” District, multi-family residential development (3+ units) requires a conditional use permit. Additionally, a conditional use permit is required if more than one principal structure is on the same lot. As the property is zoned “B-5” Highway Commercial, new construction also requires a site plan review due to the area’s adjacency to U.S. Highway 10 East. Standards of Review – Conditional Use Permit 1. The establishment, maintenance, or operation of the use will not be detrimental to, or endanger the public health, safety, morals, comfort, or general welfare. Analysis: The proposed use is consistent with the City’s Comprehensive Plan and the existing surrounding uses are unlikely to be negatively impacted by this request. The proposed multi-family development is consistent with other land uses close by, and its location more than one block away from Highway 10 will better address traffic circulation in this area of the city. Findings: The subject property, zoned “B-5” Highway Commercial, permits the construction of multi-family residential buildings via a conditional use permit and site plan review. Staff does not believe the proposed conditional use permit with the conditions outlined above would be detrimental to, or endanger the public health, safety, morals, comfort, or general welfare. 2. The use will not be injurious to the use and for the purpose already permitted, nor substantially diminish and impair property values. Analysis: The construction of several multi-family buildings are permitted on the subject property so long as minimum performance standards in the City’s Zoning Code. Findings: Multi-family residential uses and auto-centric commercial uses surround the subject property. Staff believes that the proposed development would not be contrary to uses allowed within the “B-5” District and existing uses in the general vicinity. 3. The establishment of the use will not impede the normal and orderly development and improvement of the surrounding property for uses permitted in the district. Page 31 of 80 Page 4 of 8 Analysis: The respective area is in an established and developed area of the city. The City’s Comprehensive Plan identifies this area for commercial, office and multi-family residential development. Findings: See standards one and two above. The applicant’s proposal will not impede on the normal and orderly development and improvement of the surrounding area. 4. The exterior architectural appeal and function plan of any proposed structure will not be variance with either the exterior architectural appeal and function plan, and scale of the structures already constructed or in the course of construction in the immediate neighborhood or in the character of the applicable district so as to result in a substantial or undue adverse effect on the neighborhood. Analysis: Composite siding is proposed on all structures. The multi-family buildings will have overhead garage doors, a front door and a sliding patio door on the first floor. The second floor will consist of windows for the bedrooms and bathrooms. External light fixtures are planned next to the garage door and patio door. Similar siding material is proposed for the two garage buildings. Findings: Staff believes that this standard is met. The proposed building design is consistent with other multi- family development in this area of the city. An adequate roof pitch and fenestration pattern exists to provide aesthetic variation. 5. Adequate utilities, access roads, drainage and/or facilities have been, or are being, provided. Page 32 of 80 Page 5 of 8 Analysis: Utility connections exist within the Songbird Lane and Windy Drive Right-of-Ways to support the proposed development. Access is proposed off of both Windy Drive and Songbird Lane. As this will be a phased development, access will initially be created off of Windy Drive and terminate into a temporary gravel turnaround until the final phase is complete and another access point is created off of Songbird Lane. Three infiltration basins are proposed and are scattered proportionally across the subject property. Findings: Staff believes that this standard is met. 6. Adequate measures have been, or will be taken, to provide ingress and egress so designed to minimize traffic congestion in the public streets. Analysis: Access is planned off of Windy Drive and Songbird Lane. Findings: Staff believes that access is appropriate with the additional traffic generated from this development. 7. The proposed use is not contrary to the objectives of any duly adopted land use plan for the City of Stevens Point and any of its components. Analysis: The City’s 2005 Comprehensive Plan Future Land Use Map has identified the subject property for commercial, office and multi-family residential land uses. The subject property is zoned “B-5” Highway Commercial. According to the City’s Zoning Code, the intent of the “B-5” District is “to provide for larger retail, commercial, office, and service uses which depend upon access to major highways. This district is primarily intended to accommodate regional commercial uses requiring larger land areas than the "B-4" Commercial District and which depend upon region-wide usage and region-wide access. It is the intent of this district to provide for open space, to prevent congestion, to protect the highway corridor, to protect the safety of the users of the adjacent highway and the users of the commercial sites of this district, to protect property values, and to create a convenient and safe commercial area.” Findings: Staff believes that this request meets the intent of the “B-5” District as garages are intended to support the proposed development. Subject Property Page 33 of 80 Page 6 of 8 8. The use shall, in all other respects, conform to the applicable regulations of the district in which it is located, except as such regulations may, in each instance, be modified pursuant to the recommendations of the Plan Commission. Analysis: This conditional use request is seeking to construct multiple multi-family residential buildings on the subject property. Findings: The regulations of the district are met provided that the above permit conditions are fulfilled. 9. The proposal will not result in result in an over-concentration of high-density living facilities in one area so as to result in a substantial or undue adverse effect on the neighborhood, on the school system, and the social and protective systems of the community. Analysis: 36 housing units would be created as part of this proposed development. Staff believes that 36 additional units, and roughly 62 additional persons residing on the subject property based on average household size, should not pose an adverse impact on the surrounding neighborhood, social and protective services that cover this area. Findings: This standard is met. 10. Access to the site shall be safe. Analysis: Vehicular access is off of Songbird Lane and Windy Drive. As a condition of approval, sidewalk is required to be installed on the north side of Windy Drive to support pedestrian access for this development. Findings: With 36 housing units being served by two access points, staff believes that access to the property is appropriate. 12. There shall be adequate utilities to serve the site. a. The Public Works Director, Police Chief and Fire Chief shall determine whether there is adequate sanitary sewer, portable water, storm drainage, street capacity, emergency access, public protection services, and other utilities to serve the proposed development. They shall review the plan to ensure safety and access for safety vehicles. Analysis: Utility connections exist to support the proposed development. Adequate stormwater controls are proposed in the site plan, and the surrounding road network is designed to support emergency services. Findings: This standard is met. 13. The privacy of the neighboring development and the proposed development shall be maintained as much as practical. Guidelines: a. Mechanical equipment including refuse storage shall be screened from neighboring properties. Page 34 of 80 Page 7 of 8 Analysis: Two trash enclosures are proposed – one on the north end of the subject property and the other close to Windy Drive. Findings: The proposed trash enclosures are screened from public view based on the location of residential buildings and additional landscaping being planted. b. Lighting shall be located to minimize intrusion onto neighboring properties. Analysis: Light fixtures are proposed on the front and rear elevations for each housing unit. No light fixtures are proposed in the parking lot. Findings: Staff believes that the created light should not be intrusive to neighboring properties. c. Sources of noise shall be located in a manner that minimizes impact to neighboring properties. Analysis: The use will be operating within the confines of the building and property. Findings: The use should not create excessive noise. 14. Principal – Applications for exclusive multi-family residential uses. Landscaping shall be provided, or existing landscape elements shall be preserved to maintain a sense of residential character, define boundaries, and to enhance the sense of enclosure and privacy. Analysis: Trees are proposed to be planted along both street frontages, and shrubs are proposed in front of each housing unit. Findings: Staff believes that an adequate amount of landscaping is proposed to provide character to the property. Based on the findings above, staff would recommend approval of the conditional use permit with the conditions outlined on page one. Please keep in mind that State legislation has placed limitations on local jurisdictions regarding the denial of conditional use permits. Conditional use permits shall be reviewed by a means to permit a use under certain conditions applied to the use or property. For example, if a concern is raised regarding to a standard above, a condition can be applied to the permit to address the concern and grant the permit. Standards of Review – Site Plan Review 1. Setbacks. Analysis: The following are the building setback requirements of the “B-5” Highway Commercial District – 25’ street setback, 10’ side yard setback and a 20’ rear yard setback. Note that more stringent street setbacks exist for properties abutting Highway 10 East in accordance with Wisconsin Department of Transportation requirements. Findings: The setbacks that are provided meet minimum requirements for the “B-5” District. Page 35 of 80 Page 8 of 8 Lot Line B-5 Setback Requirements Proposed Setbacks Street 40 feet – U.S. Highway 10 East 25 feet – Brilowski Road 25 feet off of Songbird Lane 43 feet off of Windy Drive Side 10 feet 23 feet Rear 20 feet 30 feet 2. Density. Analysis: Within the “B-5” District, all allowed uses are required to have a minimum lot size of 35,000 sq ft. Please note that unlike other commercial zoning districts, the “B-5” District does not differentiate in lot size requirements for residential and non-residential developments. Findings: The subject property is over 35,000 square feet in size and meets density requirements. 3. Building Height. Analysis: Building walls will be over 18 feet in height and will have a 4/12 roof pitch. Findings: Buildings within the “B-5” District are restricted to a max height of 35 feet. Structures may surpass 35 feet in height, at a height not to exceed 125 feet, if a fire prevention system exists that is approved by the Fire Department. 4. Access and Internal Traffic Flow. Analysis: Two access points are proposed – one off of Songbird Drive and the other off of Windy Drive. As noted earlier, access will initially be created off of Windy Drive and terminate into a temporary turnaround until subsequent construction phases are completed. After the third and final construction phase is complete, the access off of Songbird Lane will be created. An internal driveway will service the proposed buildings and meets minimum width requirements in the City’s Zoning Code. Findings: Staff believes that the driveway is built appropriately to handle the additional traffic volume expected within this development. 5. Parking. Analysis: 63 parking stalls are required. 48 parking stalls are provided, which includes the attached garages and two six-stall garage complexes. 36 additional outdoor parking stalls are provided next to each housing unit. Findings: The amount of off-street parking provided meets minimum parking requirements in the City’s Zoning Code. Page 36 of 80 Page 37 of 80 Page 38 of 80 Page 39 of 80 Page 40 of 80 Page 41 of 80 Point Beginningof POINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESE PRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION, MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS OR ASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTEN PERMISSION OF POINT OF BEGINNING, INC. 2025 POINT OF BEGINNING, INC.C REVISIONS CHECKED: DRAWN: DATE PROJECT NO. Civil Engineering Land Surveying Landscape Arcitecture SHEET C0.0 4941 Kirschling Court Stevens Point, WI 54481 715.344.9999(Ph) 715.344.9922(Fx) POINT CROSSING LLC Songbird Land Development STEVENS POINTPORTAGE, WI COVER SHEET JJL MAJ 09/22/2025 25.0072 CITY OF STEVENS POINT PORTAGE COUNTY, WISCONSIN RESIDENTIAL DEVELOPMENT 0 SONGBIRD LANE PROJECT LOCATION STEVENS POINT, WISCONSIN NO SCALE CIVIL SHEET INDEX: C1.0 DEMOLITION PLAN C1.1 DEMOLITION PLAN C2.0 LAYOUT PLAN C2.1 LAYOUT PLAN C3.0 GRADING PLAN C3.1 GRADING PLAN C4.0 EROSION CONTROL PLAN C4.1 EROSION CONTROL PLAN C5.0 UTILITY PLAN C5.1 UTILITY PLAN OWNER INFORMATION Page 42 of 80 t t t t t t N 89°51'29" E S 19°38'21" E S 31°10'33" W S 16°11'14" W S 65°45'23" E S 80°00'17" E N 00°13'34" W C1 35.79' 218.38' 178.77' 82.15' 55.54' 132.73' S 43°03'44" W 27.42' 328.89' ST ST STST SS SS SSSS WM WM WM WM BENCHMARK #2 ELEV=1111.69 DEMOLITION HATCH PATTERNS: CIVIL SHEET INDEX: UTILITY DISCLAIMER: BENCHMARK: C1.0 DEMOLITION PLAN C1.1 DEMOLITION PLAN C2.0 LAYOUT PLAN C2.1 LAYOUT PLAN C3.0 GRADING PLAN C3.1 GRADING PLAN C4.0 EROSION CONTROL PLAN C4.1 EROSION CONTROL PLAN C5.0 UTILITY PLAN C5.1 UTILITY PLAN BENCHMARK #1 BENCHMARK #2 BENCHMARK #3 Point Beginningof POINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESE PRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION, MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS OR ASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTEN PERMISSION OF POINT OF BEGINNING, INC. 2025 POINT OF BEGINNING, INC.C REVISIONS CHECKED: DRAWN: DATE PROJECT NO. Civil Engineering Land Surveying Landscape Arcitecture SHEET C1.0 4941 Kirschling Court Stevens Point, WI 54481 715.344.9999 (PH) 715.344.9922 (FX) POINT CROSSING LLC Songbird Land Development STEVENS POINTPORTAGE, WI DEMOLITION PLAN JJL MAJ 09/22/2025 25.0072 0' 30' 60' 1" = 30' GENERAL NOTES: KEYNOTES: MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE SEE SHEET C1.1 Page 43 of 80 t t t t t t S 65°45'23" E S 80°00'17" E S 00°23'15" E S 88°53'02" W (S 89°05'14" W) 55.54' 132.73' 222.21' 355.34' 531.66' ST ST SS SS WM WM WM WM ST WM BENCHMARK #1 ELEV=1110.74 BENCHMARK #1 BENCHMARK #2 BENCHMARK #3 Point Beginningof POINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESE PRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION, MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS OR ASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTEN PERMISSION OF POINT OF BEGINNING, INC. 2025 POINT OF BEGINNING, INC.C REVISIONS CHECKED: DRAWN: DATE PROJECT NO. Civil Engineering Land Surveying Landscape Arcitecture SHEET C1.1 4941 Kirschling Court Stevens Point, WI 54481 715.344.9999 (PH) 715.344.9922 (FX) POINT CROSSING LLC Songbird Land Development STEVENS POINTPORTAGE, WI DEMOLITION PLAN JJL MAJ 09/22/2025 25.0072 0' 30' 60' 1" = 30' UTILITY DISCLAIMER: BENCHMARK: MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE SEE SHEET C1.0 DEMOLITION HATCH PATTERNS: GENERAL NOTES: KEYNOTES: Page 44 of 80 BUILDING 5 HEIGHT 26'-4" F.F.E. = 1114.00' 25' STREET SETBACK 25' STREET SETBACK 10' SIDE SETBACK 30' REAR SETBACK BIO-INFILTRATION BASIN ELEV = 1110.50' BUILDING 6 HEIGHT 26'-4" F.F.E. = 1114.00' BUILDING 7 HEIGHT 26'-4" F.F.E. = 1113.00' BUILDING 4 HEIGHT 26'-4" F.F.E. = 1113.00' BUILDING 3 HEIGHT 26'-4" F.F.E. = 1112.00' 6-STALL GARAGE PARKING F.F.E. = 1111.50' BIO-INFILTRATION BASIN ELEV = 1109.00' 6-STALL GARAGE t t t t t t N 89°51'29" E S 19°38'21" E S 31°10'33" W S 16°11'14" W S 65°45'23" E S 80°00'17" E N 00°13'34" W C1 35.79' 218.38' 178.77' 82.15' 55.54' 132.73' S 43°03'44" W 27.42' 328.89' ST ST STST SS SS SSSS WM WM WM WM BENCHMARK #2 ELEV=1111.69 PAVEMENT HATCH PATTERNS: Point Beginningof POINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESE PRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION, MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS OR ASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTEN PERMISSION OF POINT OF BEGINNING, INC. 2025 POINT OF BEGINNING, INC.C REVISIONS CHECKED: DRAWN: DATE PROJECT NO. Civil Engineering Land Surveying Landscape Arcitecture SHEET C2.0 4941 Kirschling Court Stevens Point, WI 54481 715.344.9999 (PH) 715.344.9922 (FX) POINT CROSSING LLC Songbird Land Development STEVENS POINTPORTAGE, WI LAYOUT PLAN JJL MAJ 09/22/2025 25.0072 GENERAL NOTES: KEYNOTES: UTILITY DISCLAIMER: BENCHMARK: BENCHMARK #1 BENCHMARK #2 BENCHMARK #3 0' 30' 60' 1" = 30' MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE SEE SHEET C2.1 Page 45 of 80 25' STREET SETBACK 25' STREET SETBACK 30' REAR SETBACK 10' SIDE SETBACK 6-STALL GARAGE PARKING F.F.E. = 1111.50' BUILDING 2 HEIGHT 26'-4" F.F.E. = 1110.50' BUILDING 1 HEIGHT 26'-4" F.F.E. = 1112.00' BUILDING 8 HEIGHT 26'-4" F.F.E. = 1110.00' BUILDING 9 HEIGHT 26'-4" F.F.E. = 1111.50' BIO-INFILTRATION BASIN ELEV = 1107.00' t t t t t t S 65°45'23" E S 80°00'17" E S 00°23'15" E S 88°53'02" W (S 89°05'14" W) 55.54' 132.73' 222.21' 355.34' 531.66' ST ST SSSS SS WM WM WM WM ST WM BENCHMARK #1 ELEV=1110.74 UTILITY DISCLAIMER: BENCHMARK: BENCHMARK #1 BENCHMARK #2 BENCHMARK #3 0' 30' 60' 1" = 30' PAVEMENT HATCH PATTERNS: Point Beginningof POINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESE PRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION, MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS OR ASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTEN PERMISSION OF POINT OF BEGINNING, INC. 2025 POINT OF BEGINNING, INC.C REVISIONS CHECKED: DRAWN: DATE PROJECT NO. Civil Engineering Land Surveying Landscape Arcitecture SHEET C2.1 4941 Kirschling Court Stevens Point, WI 54481 715.344.9999 (PH) 715.344.9922 (FX) POINT CROSSING LLC Songbird Land Development STEVENS POINTPORTAGE, WI LAYOUT PLAN JJL MAJ 09/22/2025 25.0072 GENERAL NOTES: KEYNOTES: MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE SEE SHEET C2.0 Page 46 of 80 BUILDING 5 HEIGHT 26'-4" F.F.E. = 1114.00' 25' STREET SETBACK 25' STREET SETBACK 10' SIDE SETBACK 30' REAR SETBACK BIO-INFILTRATION BASIN ELEV = 1110.50' BUILDING 6 HEIGHT 26'-4" F.F.E. = 1114.00' BUILDING 7 HEIGHT 26'-4" F.F.E. = 1113.00' BUILDING 4 HEIGHT 26'-4" F.F.E. = 1113.00' BUILDING 3 HEIGHT 26'-4" F.F.E. = 1112.00' 6-STALL GARAGE PARKING F.F.E. = 1111.50' BIO-INFILTRATION BASIN ELEV = 1109.00' 6-STALL GARAGE t t t t t t N 89°51'29" E S 19°38'21" E S 31°10'33" W S 16°11'14" W S 65°45'23" E S 80°00'17" E N 00°13'34" W C1 35.79' 218.38' 178.77' 82.15' 55.54' 132.73' S 43°03'44" W 27.42' 328.89' ST ST STST SS SS SSSS WM WM WM WM BENCHMARK #2 ELEV=1111.69 Point Beginningof POINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESE PRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION, MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS OR ASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTEN PERMISSION OF POINT OF BEGINNING, INC. 2025 POINT OF BEGINNING, INC.C REVISIONS CHECKED: DRAWN: DATE PROJECT NO. Civil Engineering Land Surveying Landscape Arcitecture SHEET C3.0 4941 Kirschling Court Stevens Point, WI 54481 715.344.9999 (PH) 715.344.9922 (FX) POINT CROSSING LLC Songbird Land Development STEVENS POINTPORTAGE, WI GRADING PLAN JJL MAJ 09/22/2025 25.0072 GENERAL NOTES: 0' 30' 60' 1" = 30' MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE SEE SHEET C3.1 UTILITY DISCLAIMER: BENCHMARK: BENCHMARK #1 BENCHMARK #2 BENCHMARK #3 GRADING LEGEND: BIO-INFILTRATION BASIN Page 47 of 80 25' STREET SETBACK 25' STREET SETBACK 30' REAR SETBACK 10' SIDE SETBACK 6-STALL GARAGE PARKING F.F.E. = 1111.50' BUILDING 2 HEIGHT 26'-4" F.F.E. = 1110.50' BUILDING 1 HEIGHT 26'-4" F.F.E. = 1112.00' BUILDING 8 HEIGHT 26'-4" F.F.E. = 1110.00' BUILDING 9 HEIGHT 26'-4" F.F.E. = 1111.50' BIO-INFILTRATION BASIN ELEV = 1107.00' t t t t t t S 65°45'23" E S 80°00'17" E S 00°23'15" E S 88°53'02" W (S 89°05'14" W) 82.15' 55.54' 132.73' 222.21' 355.34' 531.66' ST ST SSSS SS WM WM WM WM ST WM BENCHMARK #1 ELEV=1110.74 0' 30' 60' 1" = 30' UTILITY DISCLAIMER: BENCHMARK: BENCHMARK #1 BENCHMARK #2 BENCHMARK #3 Point Beginningof POINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESE PRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION, MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS OR ASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTEN PERMISSION OF POINT OF BEGINNING, INC. 2025 POINT OF BEGINNING, INC.C REVISIONS CHECKED: DRAWN: DATE PROJECT NO. Civil Engineering Land Surveying Landscape Arcitecture SHEET C3.1 4941 Kirschling Court Stevens Point, WI 54481 715.344.9999 (PH) 715.344.9922 (FX) POINT CROSSING LLC Songbird Land Development STEVENS POINTPORTAGE, WI GRADING PLAN JJL MAJ 09/22/2025 25.0072 GENERAL NOTES: GRADING LEGEND: MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE SEE SHEET C3.0 INFILTRATION BASIN Page 48 of 80 BUILDING 5 HEIGHT 26'-4" F.F.E. = 1114.00' 25' STREET SETBACK 25' STREET SETBACK 10' SIDE SETBACK 30' REAR SETBACK BIO-INFILTRATION BASIN ELEV = 1110.50' BUILDING 6 HEIGHT 26'-4" F.F.E. = 1114.00' BUILDING 7 HEIGHT 26'-4" F.F.E. = 1113.00' BUILDING 4 HEIGHT 26'-4" F.F.E. = 1113.00' BUILDING 3 HEIGHT 26'-4" F.F.E. = 1112.00' 6-STALL GARAGE PARKING F.F.E. = 1111.50' BIO-INFILTRATION BASIN ELEV = 1109.00' 6-STALL GARAGE t t t t t t S 43°03'44" W 27.42' 328.89' ST ST STST SS SS SSSS WM WM WM WM BENCHMARK #2 ELEV=1111.69 EROSION CONTROL SEQUENCING: EROSION CONTROL LEGEND: Point Beginningof POINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESE PRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION, MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS OR ASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTEN PERMISSION OF POINT OF BEGINNING, INC. 2025 POINT OF BEGINNING, INC.C REVISIONS CHECKED: DRAWN: DATE PROJECT NO. Civil Engineering Land Surveying Landscape Arcitecture SHEET C4.0 4941 Kirschling Court Stevens Point, WI 54481 715.344.9999 (PH) 715.344.9922 (FX) POINT CROSSING LLC Songbird Land Development STEVENS POINTPORTAGE, WI EROSION CONTROL PLAN JJL MAJ 09/22/2025 25.0072 GENERAL NOTES: UTILITY DISCLAIMER:BENCHMARK: BENCHMARK #1 BENCHMARK #2 BENCHMARK #3 0' 30' 60' 1" = 30' 0' 30' 60' 1" = 30' MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE SEE SHEET C4.1 Page 49 of 80 25' STREET SETBACK 25' STREET SETBACK 30' REAR SETBACK 10' SIDE SETBACK 6-STALL GARAGE PARKING F.F.E. = 1111.50' BUILDING 2 HEIGHT 26'-4" F.F.E. = 1110.50' BUILDING 1 HEIGHT 26'-4" F.F.E. = 1112.00' BUILDING 8 HEIGHT 26'-4" F.F.E. = 1110.00' BUILDING 9 HEIGHT 26'-4" F.F.E. = 1111.50' BIO-INFILTRATION BASIN ELEV = 1107.00' t t t t t t S 65°45'23" E S 80°00'17" E S 00°23'15" E S 88°53'02" W (S 89°05'14" W) 82.15' 55.54' 132.73' 222.21' 355.34' 531.66' ST ST SSSS SS WM WM WM WM ST WM BENCHMARK #1 ELEV=1110.74 0' 30' 60' 1" = 30' EROSION CONTROL SEQUENCING: EROSION CONTROL LEGEND: Point Beginningof POINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESE PRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION, MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS OR ASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTEN PERMISSION OF POINT OF BEGINNING, INC. 2025 POINT OF BEGINNING, INC.C REVISIONS CHECKED: DRAWN: DATE PROJECT NO. Civil Engineering Land Surveying Landscape Arcitecture SHEET C4.1 4941 Kirschling Court Stevens Point, WI 54481 715.344.9999 (PH) 715.344.9922 (FX) POINT CROSSING LLC Songbird Land Development STEVENS POINTPORTAGE, WI EROSION CONTROL PLAN JJL MAJ 09/22/2025 25.0072 GENERAL NOTES: UTILITY DISCLAIMER:BENCHMARK: BENCHMARK #1 BENCHMARK #2 BENCHMARK #3 0' 30' 60' 1" = 30' MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE SEE SHEET C4.0 Page 50 of 80 BUILDING 5 HEIGHT 26'-4" F.F.E. = 1114.00' 25' STREET SETBACK 25' STREET SETBACK 10' SIDE SETBACK 30' REAR SETBACK BIO-INFILTRATION BASIN ELEV = 1110.50' BUILDING 6 HEIGHT 26'-4" F.F.E. = 1114.00' BUILDING 7 HEIGHT 26'-4" F.F.E. = 1113.00' BUILDING 4 HEIGHT 26'-4" F.F.E. = 1113.00' BUILDING 3 HEIGHT 26'-4" F.F.E. = 1112.00' 6-STALL GARAGE PARKING F.F.E. = 1111.50' BIO-INFILTRATION BASIN ELEV = 1109.00' t t t t t t N 89°51'29" E S 19°38'21" E S 31°10'33" W S 16°11'14" W S 65°45'23" E N 00°13'34" W C1 35.79' 218.38' 178.77' 82.15' 55.54' S 43°03'44" W 27.42' 328.89' ST ST STST SS SS SSSS WM ELEV=1112.19 WM WM BENCHMARK #2 ELEV=1111.69 UTILITY LEGEND: Point Beginningof POINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESE PRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION, MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS OR ASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTEN PERMISSION OF POINT OF BEGINNING, INC. 2025 POINT OF BEGINNING, INC.C REVISIONS CHECKED: DRAWN: DATE PROJECT NO. Civil Engineering Land Surveying Landscape Arcitecture SHEET C5.0 4941 Kirschling Court Stevens Point, WI 54481 715.344.9999 (PH) 715.344.9922 (FX) POINT CROSSING LLC Songbird Land Development STEVENS POINTPORTAGE, WI UTILITY PLAN JJL MAJ 09/22/2025 25.0072 GENERAL NOTES: UTILITY DISCLAIMER:BENCHMARK: BENCHMARK #1 BENCHMARK #2 BENCHMARK #3 0' 30' 60' 1" = 30' MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE SEE SHEET C5.1 Page 51 of 80 25' STREET SETBACK 25' STREET SETBACK 30' REAR SETBACK 10' SIDE SETBACK 6-STALL GARAGE PARKING F.F.E. = 1111.50' BUILDING 2 HEIGHT 26'-4" F.F.E. = 1110.50' BUILDING 1 HEIGHT 26'-4" F.F.E. = 1112.00' BUILDING 8 HEIGHT 26'-4" F.F.E. = 1110.00' BUILDING 9 HEIGHT 26'-4" F.F.E. = 1111.50' BIO-INFILTRATION BASIN ELEV = 1107.00' t t t t t t S 65°45'23" E S 80°00'17" E S 00°23'15" E S 88°53'02" W (S 89°05'14" W) 82.15' 55.54' 132.73' 222.21' 355.34' 531.66' ST ST SSSS SS WM WM WM WM ST WM BENCHMARK #1 ELEV=1110.74 UTILITY DISCLAIMER:BENCHMARK: BENCHMARK #1 BENCHMARK #2 BENCHMARK #3 UTILITY LEGEND: Point Beginningof POINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESE PRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION, MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS OR ASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTEN PERMISSION OF POINT OF BEGINNING, INC. 2025 POINT OF BEGINNING, INC.C REVISIONS CHECKED: DRAWN: DATE PROJECT NO. Civil Engineering Land Surveying Landscape Arcitecture SHEET C5.1 4941 Kirschling Court Stevens Point, WI 54481 715.344.9999 (PH) 715.344.9922 (FX) POINT CROSSING LLC Songbird Land Development STEVENS POINTPORTAGE, WI UTILITY PLAN JJL MAJ 09/22/2025 25.0072 GENERAL NOTES: 0' 30' 60' 1" = 30' MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE SEE SHEET C5.0 Page 52 of 80 BUILDING 5 HEIGHT 26'-4" F.F.E. = 1114.00' 25' STREET SETBACK 25' STREET SETBACK 10' SIDE SETBACK 30' REAR SETBACK BIO-INFILTRATION BASIN ELEV = 1110.50' BUILDING 6 HEIGHT 26'-4" F.F.E. = 1114.00' BUILDING 7 HEIGHT 26'-4" F.F.E. = 1113.00' BUILDING 4 HEIGHT 26'-4" F.F.E. = 1113.00' BUILDING 3 HEIGHT 26'-4" F.F.E. = 1112.00' 6-STALL GARAGE PARKING F.F.E. = 1111.50' BIO-INFILTRATION BASIN ELEV = 1109.00' t t t t t t N 89°51'29" E S 19°38'21" E S 31°10'33" W S 16°11'14" W S 65°45'23" E N 00°13'34" W C1 35.79' 218.38' 178.77' 82.15' S 43°03'44" W 27.42' 328.89' ST ST STST SS SS SSSS WM BENCHMARK #3 ELEV=1112.19 WM WM BENCHMARK #2 ELEV=1111.69 Point Beginningof POINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESE PRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION, MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS OR ASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTEN PERMISSION OF POINT OF BEGINNING, INC. 2025 POINT OF BEGINNING, INC.C REVISIONS CHECKED: DRAWN: DATE PROJECT NO. Civil Engineering Land Surveying Landscape Arcitecture SHEET L1.0 4941 Kirschling Court Stevens Point, WI 54481 715.344.9999 (PH) 715.344.9922 (FX) POINT CROSSING LLC Songbird Land Development STEVENS POINTPORTAGE, WI LANDSCAPE PLAN JJL MAJ 09/22/2025 25.0072 UTILITY DISCLAIMER:BENCHMARK: BENCHMARK #1 BENCHMARK #2 BENCHMARK #3 0' 30' 60' 1" = 30' MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE SEE SHEET L1.1 GENERAL NOTES: PLANTING SCHEDULE: LEGEND: Page 53 of 80 25' STREET SETBACK 25' STREET SETBACK 30' REAR SETBACK 10' SIDE SETBACK 6-STALL GARAGE PARKING F.F.E. = 1111.50' BUILDING 2 HEIGHT 26'-4" F.F.E. = 1110.50' BUILDING 1 HEIGHT 26'-4" F.F.E. = 1112.00' BUILDING 8 HEIGHT 26'-4" F.F.E. = 1110.00' BUILDING 9 HEIGHT 26'-4" F.F.E. = 1111.50' BIO-INFILTRATION BASIN ELEV = 1107.00' t t t t t t S 65°45'23" E S 80°00'17" E S 00°23'15" E S 88°53'02" W (S 89°05'14" W) 82.15' 55.54' 132.73' 222.21' 355.34' 531.66' ST ST SSSS SS WM WM WM WM ST WM BENCHMARK #1 ELEV=1110.74 Point Beginningof POINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESE PRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION, MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS OR ASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTEN PERMISSION OF POINT OF BEGINNING, INC. 2025 POINT OF BEGINNING, INC.C REVISIONS CHECKED: DRAWN: DATE PROJECT NO. Civil Engineering Land Surveying Landscape Arcitecture SHEET L1.1 4941 Kirschling Court Stevens Point, WI 54481 715.344.9999 (PH) 715.344.9922 (FX) POINT CROSSING LLC Songbird Land Development STEVENS POINTPORTAGE, WI LANDSCAPE PLAN JJL MAJ 09/22/2025 25.0072 UTILITY DISCLAIMER:BENCHMARK: BENCHMARK #1 BENCHMARK #2 BENCHMARK #3 0' 30' 60' 1" = 30' MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE SEE SHEET L1.0 GENERAL NOTES: PLANTING SCHEDULE: LEGEND: Page 54 of 80 Page 55 of 80 Page 56 of 80 Page 57 of 80 Page 58 of 80 Page 59 of 80 Page 60 of 80 Page 61 of 80 Page 62 of 80 Page 5 of 149 23.01 GENERAL PROVISIONS: The following general provisions shall apply in the interpretation and enforcement of this ordinance: 1) Title. This ordinance shall be known and may be cited and referred to as the "Zoning Ordinance" of the City of Stevens Point, Wisconsin. 2) Compliance. The use or development of any land or water, a change or alteration in the use of and land or water, and the use, change of use, alteration, construction, reconstruction, remodeling or expansion of any structure within the areas to be regulated by this ordinance shall be in compliance with the terms of this ordinance, and other applicable local, state, and federal regulations. 3) Conflicting Provisions Repealed. The Zoning Ordinance and all amendments thereto, the mobile home ordinance, airport height limitation ordinance and all ordinances or parts or sections of ordinances in conflict herewith, of the City of Stevens Point, WI. are hereby repealed in their entirety except provisions regulating signs and the following ordinance is enacted in lieu thereof. 4) Purpose and Intent. The purpose of this ordinance is to promote the health, safety, morals, prosperity, aesthetics and general welfare of this community. It is the general intent of this ordinance to regulate and restrict the use of all structures, lands and waters; regulate and restrict lot coverage, population distribution and density, and the size and location of all structures so as to: lessen congestion in and promote the safety and efficiency of the streets and highways; secure safety from fire, flooding, panic and other dangers; provide adequate light, air, sanitation and drainage; percent over-crowding; avoid undue population concentration; facilitate the adequate provision of public facilities and utilities; stabilize and protect property values; further the appropriate use of land and conservation of natural resources; preserve and promote the beauty of the community; and implement the community's comprehensive plan or plan components. It is further intended to provide for the administration and enforcement of this ordinance and to provide penalties for its violation. 5) Authority. These regulations are adopted pursuant to the authorization contained in Sections 62.23, 87.30, ll4.l26 and l45.02 of the Wisconsin Statutes as amended and said Section of Wisconsin Statutes is hereby adopted. 6) Interpretation, Greater Restrictions and Abrogation. General Provisions - Existing Page 63 of 80 Page 6 of 149 Where a city ordinance other than this chapter is more restrictive than the provisions contained in this ordinance, that ordinance shall continue in full force and effect to the extent of the greater restrictions, but not otherwise. This ordinance is not intended to repeal, abrogate, or impair any existing easements, covenants, or private deed restrictions. However, where this ordinance imposes greater restrictions, the provisions of this ordinance shall prevail. 7) Warning and Disclaimer of Liability. The degree of protection intended to be provided by this chapter is considered reasonable for regulatory purposes and is based on engineering and scientific methods of study. This ordinance does not imply that compliance will result in freedom from damages nor shall this ordinance create a liability on the part of or a cause of acting against the City of Stevens Point or any officer or employee for any damage that may result from reliance on this ordinance. 8) Effective Date. This ordinance is effective after public hearing, adopted by the Common Council on February 14, 1979, and publication on February 23, 1979. 9) Severability. Should any section or provision of this ordinance be declared by a court of competent jurisdiction to be invalid, that decision shall not affect the validity of the ordinance as a whole or any part thereof, other than the part so declared to be invalid. 10) Exceptions and Modifications. The regulations specified in this ordinance shall be subject to the following exceptions and interpretations: Structures permitted above height limit. The building height limitations of this ordinance shall be modified as follows: 1) Chimneys, cooling towers, elevator bulkheads, fire towers, monuments, penthouses, stacks, stage towers or scenery lofts, tanks, water towers, silos, spires and radio or television towers, or necessary mechanical appurtenances may be erected to a height in accordance with existing or here-after adopted ordinances of the City of Stevens Point, Wisconsin. 2) Public, semi-public or public service building, hospitals, sanitariums or schools, when permitted in a district, may be erected to a height not exceeding sixty (60) feet, and churches and temples, or structures at an airport, when permitted in a district may be erected to a height not exceeding seventy-five (75) feet if the building is set back from each property line at least two (2) feet for each foot of additional building height above the height limit otherwise provided in the district in which the building is built. Page 64 of 80 23.01 GENERAL PROVISIONS: The following general provisions shall apply in the interpretation and enforcement of this Oordinance: 1) Title. This Oordinance, effective as of XXXXXX X, 20XX, shall be known and may be cited and referred to as the "Zoning Ordinance" of the City of Stevens Point, Wisconsin. This title may also be known and referred to as “this Chapter” or “this Ordinance.” 2) Zoning Map. The Stevens Point Zoning Map is hereby incorporated into and made a part of this Ordinance. The Zoning Administrator shall administer the Zoning Map in accordance with Section 23.XX. 3) Authority & Applicability. a) This Ordinance is created pursuant to the authority granted under ss. 62.23(7), 62.231, 87.30, 236.45, and 281.31, Wis. Stats. b) Where this Ordinance refers to or cites a section of Wisconsin Statutes and federal law, and such section is later amended or superseded, then this Ordinance shall refer to the amended section or the section that most nearly corresponds to the superseded section. c) All lands within the City’s corporate boundary and its extraterritorial jurisdiction, as identified on the Zoning Map, are subject to this Ordinance. a) When allowed by the State of Wisconsin, this Ordinance shall apply to any building, structure, lot, land use, development, or subdivision by City, county, state, or federal agencies on land subject to this Ordinance. d) 4) Severability. Should any section or provision of this Ordinance be declared by a court of competent jurisdiction to be invalid, that decision shall not affect the validity of the Ordinance as a whole or any part thereof, other than the part so declared to be invalid. 2) Compliance. The use or development of any land or water, a change or alteration in the use of and land or water, and the use, change of use, alteration, construction, reconstruction, remodeling or expansion of any structure within the areas to be regulated by this ordinance shall be in compliance with the terms of this ordinance, and other applicable local, state, and federal Commented [AK1]: Finalized at a later date. Commented [AK2]: City zoning statute. Commented [AK3]: City zoning of wetlands in shorelands. Commented [AK4]: Floodplain zoning. Commented [AK5]: Subdivision regulations. NOTE: To be included if the City’s Subdivision Ordinance is consolidated in the Zoning Ordinance. Commented [AK6]: Navigable waters protection law. Commented [AK7]: NOTE: To be included if the City’s Subdivision Ordinance is consolidated in the Zoning Ordinance. Page 65 of 80 regulations. 3) Conflicting Provisions Repealed. The Zoning Ordinance and all amendments thereto, the mobile home ordinance, airport height limitation ordinance and all ordinances or parts or sections of ordinances in conflict herewith, of the City of Stevens Point, WI. are hereby repealed in their entirety except provisions regulating signs and the following ordinance is enacted in lieu thereof. 4) Purpose and Intent. 5) The purpose of this ordinance is to promote the health, safety, morals, prosperity, aesthetics and general welfare of this community. It is the general intent of this ordinance to regulate and restrict the use of all structures, lands and waters; regulate and restrict lot coverage, population distribution and density, and the size and location of all structures so as to: lessen congestion in and promote the safety and efficiency of the streets and highways; secure safety from fire, flooding, panic and other dangers; provide adequate light, air, sanitation and drainage; percent over-crowding; avoid undue population concentration; facilitate the adequate provision of public facilities and utilities; stabilize and protect property values; further the appropriate use of land and conservation of natural resources; preserve and promote the beauty of the community; and implement the community's comprehensive plan or plan components. It is further intended to provide for the administration and enforcement of this ordinance and to provide penalties for its violation. 5) The purpose of this Ordinance is to: 1. Protect the health, safety, and general welfare of the public; 2. Implement goals and policies of the City’s Comprehensive Plan; 3. Regulate the location, construction, reconstruction, alteration, and use of buildings, structures, and land; 4. Provide adequate light and air; prevent the overcrowding of land; secure safety from fire, panic, and other dangers; 5. Control and lessen congestion in the streets; Commented [AK8]: Consolidated under 23.01(3). Page 66 of 80 6. Promote an efficient and economic use of land; 7. Facilitate adequate provisions for transportation, water, sewerage, schools, parks, and other public facilities; and 6. Ensure orderly development that is complementary and harmonious to the surrounding area. Authority. These regulations are adopted pursuant to the authorization contained in Sections 62.23, 87.30, ll4.l26 and l45.02 of the Wisconsin Statutes as amended and said Section of Wisconsin Statutes is hereby adopted. 7)6) Interpretation, Greater Restrictions and Abrogation. Where a city ordinance other than this chapter Ordinance is more restrictive than the provisions contained in this Oordinance, that ordinance shall continue in full force and effect to the extent of the greater restrictions, but not otherwise. This Oordinance is not intended to repeal, abrogate, or impair any existing easements, covenants, or private deed restrictions. However, where this Oordinance imposes greater restrictions, the provisions of thisO ordinance shall prevail. 7) Word Usage The interpretation of this Ordinance shall abide by the provisions and rules of this Section, except where the context clearly requires otherwise, or where the result would clearly be inconsistent with the apparent intent of this Ordinance. a) The word “City” shall mean the City of Stevens Point, Wisconsin. b) The word “County” shall mean the County of Portage, Wisconsin. c) The word “State” shall mean the State of Wisconsin. d) The words “Plan Commission” shall mean the City of Stevens Point Plan Commission. e) The words “Zoning Board of Appeals” and “Board of Appeals” shall refer to the City of Stevens Point Zoning Board of Appeals. f) The word “Council” shall refer to the City of Stevens Point Common Council. g) The words “shall,” “will,” and “must” are mandatory. h) The words “may,” “might,” and “can” are permissive. i) The masculine gender shall include the feminine, and vice versa. j) Words that are used or defined in one tense or form shall include other tenses and derivative forms. 8) Abbreviations The following abbreviations in this Ordinance are intended to have the following meanings: Abbreviation Meaning Commented [AK9]: Reviewed during October 21, 2025 Plan Commission meeting. Commented [AK10]: Consolidated under 23.01(3). Page 67 of 80 ft Foot Sq ft Square Feet Wis. Stats. Wisconsin Statutes P Permitted Land Use C Conditional Land Use 8) Warning and Disclaimer of Liability. The degree of protection intended to be provided by this chapter is considered reasonable for regulatory purposes and is based on engineering and scientific methods of study. This ordinance does not imply that compliance will result in freedom from damages nor shall this ordinance create a liability on the part of or a cause of acting against the City of Stevens Point or any officer or employee for any damage that may result from reliance on this ordinance. 9) Effective Date. This ordinance is effective after public hearing, adopted by the Common Council on February 14, 1979, and publication on February 23, 1979. 10) Severability. Should any section or provision of this ordinance be declared by a court of competent jurisdiction to be invalid, that decision shall not affect the validity of the ordinance as a whole or any part thereof, other than the part so declared to be invalid. Commented [AK11]: Consolidated with 23.01(1). Commented [AK12]: Relocated above. Page 68 of 80 3336073 Easement THIS INDENTURE is made this ______ day of ______________, ______, by and between City of Stevens Point, ("Grantor") and WISCONSIN PUBLIC SERVICE CORPORATION, a Wisconsin Corporation, along with its successors and assigns (collectively, "Grantee") for good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, Grantor, owner of land, hereby grants and warrants to, Grantee, a permanent easement upon, within, beneath, over and across a part of Grantor’s land hereinafter referred to as "easement area" more particularly described as follows: Part of Lots 1 and 2, and Outlot 2 of Certified Survey Map No. 11827, Recorded in the Portage County Register of Deeds as Document 900985; and part of Blocks 9, 10, & 24 of the recorded Plat of Strong, Ellis, and Others Addition, all being part of Government Lot 2 of Section 32, Township 24 North, Range 8 East, City of Stevens Point, County of Portage, State of Wisconsin, as shown on the attached Exhibit “A”. Return to: Wisconsin Public Service Corp. Real Estate Dept. P.O. Box 19001 Green Bay, WI 54307-9001 Tax Parcel Identification Number (PIN) 281-24-0832201308 281-24-0832201937 281-24-0832201938 281-24-0832201939 1. Purpose: ELECTRIC UNDERGROUND AND GAS - The purpose of this easement is to construct, install, operate, maintain repair, replace and extend underground utility facilities, conduit and cables, electric pad-mounted transformers, manhole, electric pad-mounted vacuum fault interrupter, concrete slabs, power pedestals, riser equipment, terminals and markers, together with all necessary and appurtenant equipment under and above ground, as well as pipeline or pipelines with valves, tieovers, main laterals and service laterals, together with all necessary and appurtenant equipment under and above ground, including cathodic protection apparatus used for corrosion control, as deemed necessary by Grantee, for the transmission and distribution of electric energy, signals, television and telecommunications services; natural gas and all by-products thereof, or any liquids, gases, or substances which can or may be transported or distributed through a pipeline, including the customary growth and replacement thereof. Trees, bushes, branches and roots may be trimmed or removed so as not to interfere with Grantee's use of the easement area. 2. Access: Grantee shall have the right to enter on and across any of the Grantor’s property outside of the easement area as may be reasonably necessary to gain access to the easement area and as may be reasonably necessary for the construction, installation, operation, maintenance, inspection, removal or replacement of the Grantee’s facilities. 3. Buildings or Other Structures: Grantor agrees that no structures will be erected in the easement area or in such close proximity to Grantee's facilities as to create a violation of all applicable State of Wisconsin electric and gas codes or any amendments thereto. Page 69 of 80 4. Elevation: Grantor agrees that the elevation of the ground surface existing as of the date of the initial installation of Grantee's facilities within the easement area will not be altered by more than 4 inches without the written consent of Grantee. 5. Restoration: Grantee agrees to restore or cause to have restored Grantor's land, as nearly as is reasonably possible, to the condition existing prior to such entry by Grantee or its agents. This restoration, however, does not apply to any trees, bushes, branches or roots which may interfere with Grantee's use of the easement area. 6. Exercise of Rights: It is agreed that the complete exercise of the rights herein conveyed may be gradual and not fully exercised until sometime in the future, and that none of the rights herein granted shall be lost by non- use. 7. Binding on Future Parties: This grant of easement shall be binding upon and inure to the benefit of the heirs, successors and assigns of all parties hereto. 8. Easement Review: Grantor acknowledges receipt of materials which describe Grantor’s rights and options in the easement negotiation process and furthermore acknowledges that Grantor has had at least 5 days to review this easement document or voluntarily waives the five day review period. [REMAINDER OF PAGE LEFT BLANK] Page 70 of 80 WITNESS the hand and seal of the Grantor the day and year first above written City of Stevens Point Organization name Sign Name Print name & title Sign Name Print name & title STATE OF ) )SS COUNTY OF ) This instrument was acknowledged before me this _______ day of ___________________, _______, by the above-named_________________________________________________________ City of Stevens Point, to me known to be the Grantor(s) who executed the foregoing instrument on behalf of said Grantor(s) and acknowledged the same Sign Name Print Name Notary Public, State of My Commission expires: This instrument drafted by: Philip Paradies Wisconsin Public Service Corporation REMS Entity ID WR Number Document ID REMS Formatted Number 1488432 WMIS-3362776 3336073 INT11-488-432 Page 71 of 80 **Temporary Exhibit ** **Final Exhibit will be sent for approval at a later date** Page 72 of 80 ¬« 66 Water Street Main Street A r l i n g t o n P l a c e Second Street Clark Street Third Street W e s t C l a r k S t r e e t 0 100 200 Feet ´ Parcel of Interest Prepared by Portage County Planning and Zoning: August 20, 2025 RPS This map shows the approximate relative location of property boundaries but was not prepared by a professional land surveyor. This map is provided for informational purposes only and may not be sufficient or appropriate for legal, engineering, or surveying purposes. Date of Photography: Spring, 2020 Parcel Boundaries Page 73 of 80 City of Stevens Point 1515 Strongs Avenue Stevens Point, WI 54481-3594 Department of Community Development Redevelopment Authority Jarod Kivela, Director Ph: (715) 346-1567 Fax: (715) 346-1498 www.stevenspoint.com Open Records Information: The City of Stevens Point is subject to Wisconsin Statutes relating to public records. Communication, such as this document, sent or received by City employees are subject to these laws. Unless otherwise exempted from the public records law, senders and receivers of City communication should presume that the communications are subject to release upon request, and to state record retention requirements. Page 1 of 1 MEMORANDUM To: City of Stevens Point Plan Commission and Common Council From: Jarod Kivela, Director of Community Development Date: October 29, 2025 RE: Forest Creek Subdivision – Request to Combine Lots A request has been submitted regarding two remaining small lots within the Forest Creek Subdivision. The developer, who previously purchased and constructed single-family slab-on-grade homes on two of the four small lots in this block, is seeking to purchase the remaining two lots (each approximately 5,040 square feet) and combine them into a single parcel totaling 10,080 square feet. After evaluating the site, the developer has indicated that building on the final corner lot as a standalone single-family home would be challenging given its configuration and grading. The developer does not specialize in zero-lot-line or duplex construction and would prefer to combine the lots to construct one additional single-family home consistent with their prior development in the subdivision. Staff has reviewed the request with City building inspectors and evaluated it against applicable zoning standards. While construction of two single-family homes would not be impossible, it is not considered ideal based on site conditions and lot layout. Staff is therefore bringing this request forward to the Plan Commission and Common Council for direction. The options available include: 1. Approving the combination and sale of the two lots to the developer for construction of a single-family home; or 2. Maintaining the lots as separate parcels for potential development as a duplex, zero-lot-line homes, or two smaller single-family homes by a future builder. Staff seeks input from the Plan Commission and Council regarding the preferred course of action. Page 74 of 80 Page 75 of 80 Page 76 of 80 City of Stevens Point 1515 Strongs Avenue Stevens Point, WI 54481-3594 Department of Community Development & Redevelopment Authority Jarod Kivela, Director Ph: (715) 346-1567 Fax: (715) 346-1498 www.stevenspoint.com Open Records Information: The City of Stevens Point is subject to Wisconsin Statutes relating to public records. Communication, such as this document, sent or received by City employees are subject to these laws. Unless otherwise exempted from the public records law, senders and receivers of City communication should presume that the communications are subject to release upon request, and to state record retention requirements. Page 1 of 4 DIRECTORS REPORT To: City Plan Commission From: Jarod Kivela, Director of Community Development Date: October 30, 2025 RE: Directors Report ---------------------- Development Updates • Portage County Business Park BID/Downtown BID: Karen Margelofsky has started as the BID Executive Director. We are excited to have her on board! Karen has already jumped into the deep end and has started to complete the revisions to both Operation Plans and budgets. She is of course learning all of the elements to each BID and the city as a whole (future projects, grant programs, etc.). Staff looks forward to working alongside Karen to ensure she has the support needed as she continues to learn the ropes. • Forest Creek Subdivision: A total of 25 lots have had movement in the new subdivision. 21 of the lots have officially closed and 4 are pending. Although a rocky process for each, all of the mailboxes have been installed, and TDS has installed Fiber throughout the subdivision. Both systems are operational. Page 77 of 80 stevenspoint.com • TID 14: Staff continues to explore leads for new business for this area as well as respond to RFI’s that come in through the WEDC. City Staff continues to evaluate and advocate for ways to make this area more attractive and set it up for success. The City’s new industrial park site in TID 14 (Badger Ave area) is continuing to be overlooked by businesses, as it does not have high-pressure gas Address Lot Number Sale Date Purchase Price 0 FOREST CREEK RD STEVENS POINT WI 54482 15 5/6/2025 $65,000.00 5534 FOREST CREEK RD STEVENS POINT WI 54482 17 6/27/2025 $55,000.00 5542 FOREST CREEK RD STEVENS POINT WI 54482 18 7/3/2025 $55,000.00 0 FOREST CREEK RD STEVENS POINT WI 54482 21 Pending $55,000.00 5580 FOREST CREEK RD STEVENS POINT WI 54482 22 10/15/2025 $55,000.00 0 FOREST CREEK RD STEVENS POINT WI 54482 23 Pending $55,000.00 5581 FOREST CREEK RD STEVENS POINT WI 54482 27 4/9/2025 $22,000.00 5573 FOREST CREEK RD STEVENS POINT WI 54482 28 4/9/2025 $22,000.00 0 FOREST CREEK RD STEVENS POINT WI 54482 29 Offer $34,000.00 0 LEONARD ST STEVENS POINT WI 54482 30 Offer 5572 GOLLA RD, STEVENS POINT, WI 54482 34 4/9/2025 $45,000.00 5566 GOLLA RD, STEVENS POINT, WI 54482 35 4/9/2025 $45,000.00 220 LEONARD ST STEVENS POINT WI 54482 37 5/23/2025 $50,000.00 212 LEONARD ST, STEVENS POINT, WI 54482 38 4/9/2025 $50,000.00 0 FOREST CREEK RD STEVENS POINT WI 54482 39 10/10/2025 $50,000.00 0 FOREST CREEK RD STEVENS POINT WI 54482 40 9/11/2025 $50,000.00 211 JOE ST, STEVENS POINT, WI 54482 41 4/9/2025 $50,000.00 219 JOE ST STEVENS POINT WI 54482 42 5/23/2025 $50,000.00 0 FOREST CREEK RD STEVENS POINT WI 54482 49 9/11/2025 $25,000.00 0 FOREST CREEK RD STEVENS POINT WI 54482 50 9/11/2025 $25,000.00 0 FOREST CREEK RD STEVENS POINT WI 54482 51 9/11/2025 $25,000.00 0 FOREST CREEK RD STEVENS POINT WI 54482 52 9/11/2025 $25,000.00 0 FOREST CREEK RD STEVENS POINT WI 54482 53 9/11/2025 $25,000.00 0 FOREST CREEK RD STEVENS POINT WI 54482 54 9/11/2025 $25,000.00 5469 FOREST CREEK RD STEVENS POINT WI 54482 55 4/9/2025 $25,000.00 Page 78 of 80 stevenspoint.com available for use or rail access. Many businesses looking to locate in an area like this want to have the systems already installed or have a guaranteed installation date. Through a partnership with Burlington Junction Railway, an effort is being made to source local and regional businesses that could benefit from rail in the park. We are at the beginning stages of having those discussions. With pairing potential local interest and continuing to source new businesses to the park, staff is confident that a pathway can be found to get the rail installed and show a positive financial justification for doing so. • Shopko Site: The developer that has been engaged with the city for the better part of this year has unfortunately missed the WHEDA deadline for tax credits and had to return them. With that being the case, the project was essentially dead for this year. Interest was provided by the developer to submit for next year recently, but Staff has already been working through the process with a developer on another portion of the site. Staff notified the past developer that we would love to work with them through next year if they would like to resubmit their proposal. After completing presentations to the RDA, the RDA directed staff to work with Commonwealth Development on an approx. 47 unit affordable housing project on the southeast quarter of the Shopko site. The RDA asked the developer to rework the plan a bit to include more parking and an expanded community servicing facility so that a full daycare could be accommodated in the space. The developer is working on this but has approached the City about a possible increase in the TIF ask to accommodate the expanded facility. More discussions to come. An RDA meeting is being scheduled for mid November. • City Hall: The City Council made a decision to build a new on the 1039 Ellis Street site. Staff have now started the initial design process for the new build with Somerville Architects. While the design work progresses, Staff will work on any additional items needed to prepare for the work (Phase 2 ESA coordination, demolition coordination, survey work, finalizing the transfer with the county, etc.). Although there is a lot of work ahead of us, it is great to see progress. It is hoped to have a more formal layout and design presented in the near future. A design committee will also be formed so that recommendations can be made on the overall aesthetics of the new building. • The Oaks on Maria Drive: Work continues! The building is being buttoned up, and interior work continues. • 1466 Water Street/Edgewater Manor Site: Pelton Builders recently notified the City that they would like to rescind the LOI and withdraw their interest on the site. The contamination aspect of the site was outside of their typical development desires and they are now working with the City on a potential new site for a multi-family project. An RFP has been rereleased for this property. A few different proposals have been submitted for this property. Staff continues to work through the process with potential developers, current tenants, environmental consultants, state representatives, adjacent land owners and infrastructure companies to keep this project site moving. With these old sites, there is never a clear and easy process. There are always many moving parts that demand quite a bit of staff time. Staff hopes to continue working through the process and bring forward any RFP responses in Q1 of 2026. • Comprehensive Plan: Staff have contracted with the North Central Wisconsin Regional Planning Commission to assist with this effort. The first sections are to be reviewed in the coming weeks by staff, the RPC, and the Planning Commission. This document rewrite is another heavy lift in addition to the zoning code rewrite. Staff is working to juggle both organization of redevelopment sites and Page 79 of 80 stevenspoint.com this rewrite. Although a tough situation and heavy demand, staff is navigating quite well. We ask for your patience with us as we continue to work through each of these priorities. General Department • Anna Sager from UWSP has been doing a fantastic job assisting with the zoning code rewrite. We have offered her the opportunity to stay with us through the spring year, to which she accepted! We are excited to have her on board for a longer period of time to not only assist us through a heavy project, but also allow her to learn as much as she can through our knowledgeable staff. • Although an absence in multiple positions resulted in the department falling a bit behind, all new staff are quickly learning the ropes and working to dig out of that backlog. Loren and Rebecca are both doing well in their positions and will increase their efficiency as time continues. Although anything can happen, the department looks forward to having a full strength staff in 2026 so that the workload can be properly evaluated. There is room for efficiency yet and a need for minor staffing changes, but more insight will be gained through 2026. • Ximena Christianson has submitted her retirement notice for January 5, 2026. The department has been approved for a brief overlap period for training purposes and has thus started the hiring process for that position. Through the process, Cody Hoffman (current electrical inspector) has been offered the positions and has accepted. We are excited to see him excel in his field and look for advancement. With that position now open, we will be looking to post and fill that prior to the end of November. • Although not department specific, the current CVB Director has resigned and left the organization. Ample notice was provided and a search for a new Director started right away. The interview process continues and it is anticipated that a new Director will be brought on in December of 2025 or right away in the new year. Page 80 of 80

Source: City of Stevens Point website. First collected Nov 6, 2026.