City Plan Commission — Agenda Packet
City of Stevens Point · Portage County · City Plan Commission · meeting of Nov 3, 2025 · Agenda packets
Open the original document More from City of Stevens Point
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Our intention is to have in-person meetings going
forward. For the time being, we will hold the City
Committee Meetings, Plan Commission, Council and
most others at the Community Room at 933 Michigan
Avenue. This in-person location will meet the legal
requirement for our open meetings.
We will have a virtual option available, but the
technology for the hybrid style meeting may not be
reliable all of the time.
AGENDA
CITY PLAN COMMISSION
Members
• Mayor Wiza
• Alderperson Kneebone
• Commissioner Arntsen
• Commissioner Beacom
• Commissioner Rice
• Commissioner Schuler
Date
and
Time:
November 3, 2025
6:00 PM
Location:
Community Room
933 Michigan Avenue, Stevens Point, WI
OR
Zoom Teleconferencing
Meeting ID: 863 9687 4563
Passcode: 225205
By Computer:
https://us02web.zoom.us/j/86396874563?pwd=QcNYTakzK6PLkbL74b
By Phone: +1-312-626-6799 (US Chicago)
Opening Section:
1. Roll Call
Discussion and Possible Action on:
2. Report of the October 6, October 8, & October 21, 2025 meetings of the City Plan
Commission.
3. Public Hearing and action on a request from Dustin Haugen for a conditional use permit to
construct an accessory structure on the property located at 1208 Wisconsin Street (Parcel
ID 281240832400814) utilizing “R-TND” Traditional Neighborhood Overlay District setback
requirements, consistent with Ch. 23.02(1)(h)(3).
4. Public Hearing and action on a request from Thomas Bushman for a conditional use permit
to operate a single-family residence on the property located at 2877 Church Street (Parcel
ID 281230805101713), consistent with Ch. 23.02(2)(a)(3)(d).
5. Public Hearing and action on a request from Jim Lundberg, representing Point Crossing
LLC, for a conditional use permit to construct multiple multi-family residential buildings on
an unaddressed parcel bounded by Songbird Lane (Parcel ID 281240836220063),
consistent with Ch. 23.01(14)(f) & Ch. 23.02(1)(f)(3)(b).
6. A request from Jim Lundberg, representing Point Crossing LLC, for a site plan review to
construct multiple multi-family residential buildings on an unaddressed parcel bounded by
Page 1 of 80
Songbird Lane (Parcel ID 281240836220063), consistent with Ch. 23.02(2)(e)(5).
7. Zoning Code Rewrite - First Review of Draft General Provisions.
8. A request from Wisconsin Public Service for a Utility Easement along Water Street.
9. A request from Green Tree Companies to purchase lots 29 and 30 in the Forest Creek
Subdivision and combine them for the purpose of constructing a single-family home.
10. Director's Report.
Closing Section:
11. Adjourn
PLEASE TAKE NOTICE that any person who has special needs while attending these meetings or needs agenda materials for these meetings
should contact the City Clerk as soon as possible to ensure that a reasonable accommodation can be made. The City Clerk can be reached by
telephone at (715) 346-1569 or by mail at 1515 Strongs Avenue, Stevens Point, WI 54481.
Maps further defining the above area(s) may be obtained from the City of Stevens Point Department of Community Development, 1515
Strongs Avenue, Stevens Point, WI 54481, or by calling (715) 346-1567, during normal business hours.
PLEASE TAKE FURTHER NOTICE that a quorum of the Common Council may be in attendance at this meeting.
Page 2 of 80
Our intention is to have in-person meetings going
forward. For the time being, we will hold the City
Committee Meetings, Plan Commission, Council and
most others at the Community Room at 933 Michigan
Avenue. This in-person location will meet the legal
requirement for our open meetings.
We will have a virtual option available, but the
technology for the hybrid style meeting may not be
reliable all of the time.
MINUTES
CITY PLAN COMMISSION
Members
• Mayor Wiza
• Alderperson Kneebone
• Commissioner Arntsen
• Commissioner Beacom
• Commissioner Miskowiak
• Commissioner Rice
• Commissioner Schuler
Date
and
Time:
October 6, 2025
6:00 PM
Location:
Community Room
933 Michigan Avenue, Stevens Point, WI
OR
Zoom Teleconferencing
Meeting ID: 815 5922 1570
Passcode: 128498
By Computer:
https://us02web.zoom.us/j/81559221570?pwd=loLehx6Dbnj0NnbGCbi
By Phone: +1-312-626-6799 (US Chicago)
Opening Section:
1. Roll Call
• Meeting called to order at 6:00PM.
• Members Present: Mayor Wiza, Alder Kneebone, Commissioners Arntsen,
Beacom, Miskowiak, Rice, Schuler
Discussion and Possible Action on:
2. Report of the September 2, 2025 meeting of the City Plan Commission.
• Background: Report of the September 2, 2025 meeting of the City Plan
Commission is included in the agenda packet.
• Motion: Arntsen moves approval of the Report of the September 2, 2025 meeting of
the City Plan Commission.
• Second: Kneebone seconds.
• Discussion: None.
• Vote: Unanimous approval.
3. Public Hearing and action on a request from the City of Stevens Point to amend Chapter
23, Zoning Ordinance, of the Revised Municipal Code of the City of Stevens Point. Said
request amends Section 23.02(4)(e) establishing groundwater protection zones for
municipal well #12.
Page 3 of 80
• Background: Director Lemke provides an explanation of the ordinance amendment
and need for it.
• Public Hearing: No public testimony heard.
• Motion: Arntsen moves approval of the amendment as presented.
• Second: Beacom seconds.
• Discussion: No further discussion.
• Vote: Unanimous approval.
4. A request from Tyler Ignatowski, representing Little Captain LLC, to annex an
unaddressed parcel bounded by Stanley Street (Parcel ID 020240828-14.18) from the
Town of Hull to the City of Stevens Point.
• Background: Associate Planner & Zoning Administrator Kuhn provides a
background of the annexation request. Staff recommendation is to approve the
request.
• Motion: Arntsen moves approval of the annexation request as presented.
• Second: Miskowiak seconds.
• Discussion:
o Rice inquires about the previous work history of the applicant.
o Alder Morrow, District 11, speaks on the proposed development.
• Vote: Unanimous approval.
5. Staff Update: Zoning Code Rewrite.
• Background: Kuhn provides a verbal update of the zoning code rewrite,
summarizing the final steps of the public engagement phase for the rewrite.
• Discussion:
o Schuler asks about staff satisfaction with public engagement in the process.
6. Director's Report.
• Background: Director Kivela provides a verbal report.
Closing Section:
7. Adjourn
• Meeting adjourned at 6:23PM.
PLEASE TAKE NOTICE that any person who has special needs while attending these meetings or needs agenda materials for these meetings
should contact the City Clerk as soon as possible to ensure that a reasonable accommodation can be made. The City Clerk can be reached by
telephone at (715) 346-1569 or by mail at 1515 Strongs Avenue, Stevens Point, WI 54481.
Maps further defining the above area(s) may be obtained from the City of Stevens Point Department of Community Development, 1 515
Strongs Avenue, Stevens Point, WI 54481, or by calling (715) 346-1567, during normal business hours.
PLEASE TAKE FURTHER NOTICE that a quorum of the Common Council may be in attendance at this meeting.
Page 4 of 80
Page 5 of 80
Our intention is to have in-person meetings going
forward. For the time being, we will hold the City
Committee Meetings, Plan Commission, Council and
most others at the Community Room at 933 Michigan
Avenue. This in-person location will meet the legal
requirement for our open meetings.
We will have a virtual option available, but the
technology for the hybrid style meeting may not be
reliable all of the time.
MINUTES
CITY PLAN COMMISSION
Members
• Mayor Wiza
• Alderperson Kneebone
• Commissioner Arntsen
• Commissioner Beacom
• Commissioner
Miskowiak
• Commissioner Rice
• Commissioner Schuler
Date
and
Time
:
Octob
er 8,
2025
6:00
PM
Locatio
n:
Community Room
933 Michigan Avenue, Stevens Point, WI
OR
Zoom Teleconferencing
Meeting ID: 890 0020 0557 | Passcode: 250080
By
Computer: https://us02web.zoom.us/j/89000200557?pwd=bbu7dEEJkVoofUWzaMDdb
AIGafL6T3.1
By Phone: +1-312-626-6799 (US Chicago)
Opening Section:
1. Roll Call
• Meeting called to order at 6:00PM.
• Members Present: Mayor Wiza, Alder Kneebone, Commissioners Arntsen,
Beacom, Rice, Schuler.
• Members Excused: Commissioner Miskowiak.
Discussion and Possible Action on:
1. Review of Comprehensive Plan Chapter 2: Natural, Agricultural, and Cultural Resources
and recommendation to Common Council.
• Background: Sam Wessel, North Central Wisconsin Regional Plan Commission,
and Chris Klesmith, Neighborhood Planner, provide an overview of the
amendments to Comprehensive Plan Chapter 2 and recommendations provided by
community members.
• Discussion:
o Recommendations for Chapter 2 are provided by Commissioners Schuler,
Beacom, Alder Kneebone, Mayor Wiza; Commissioners request additional
discussion on Goals, Objectives, and Policies and a comparison of the
conclusions between the former comprehensive plan and current draft.
o
• Motion:
Page 6 of 80
o No action is taken.
2. Review of Comprehensive Plan Chapter 4: Utilities and Community Facilities and
recommendation to Common Council.
• Background: Wessel and Klesmith provide a review of amendments to
Comprehensive Plan Chapter 4.
• Discussion:
o Recommendations and amendments for Comprehensive Plan Chapter 4 are
provided by Commissioners Schuler, Mayor Wiza, Alder Kneebone,.
Commissioners request additional information regarding the City facilities
planning early in the Chapter and a similar comparison that was requested
for Chapter 2.
• Motion:
o No action is taken.
3. Review of draft Comprehensive Plan Chapter 3: Housing.
• Background: Wessel and Klesmith provide an overview of the draft of
Comprehensive Plan Chapter 3: Housing.
• Discussion:
o Requests for clarification and recommendations are heard from
Commissioners Beacom, Schuler, Arntsen, and Mayor Wiza regarding the
housing affordability analysis and associated figures, and to revisit the
explanation of how the City should be responding to the data. Further
comments are received on owner and renter rates, and housing solutions,
including rationale for tax incremental financing. Further comments are
heard on the chapter’s Goals, Objectives, and Policies.
• Motion:
o No action is taken.
Closing Section:
1. Adjournment
• Meeting adjourned at 7:32PM.
PLEASE TAKE NOTICE that any person who has special needs while attending these meetings or needs agenda materials for these meetings
should contact the City Clerk as soon as possible to ensure that a reasonable accommodation can be made. The City Clerk can be reached by
telephone at (715) 346-1569 or by mail at 1515 Strongs Avenue, Stevens Point, WI 54481.
Maps further defining the above area(s) may be obtained from the City of Stevens Point Department of Community Development, 1515
Strongs Avenue, Stevens Point, WI 54481, or by calling (715) 346-1567, during normal business hours.
PLEASE TAKE FURTHER NOTICE that a quorum of the Common Council may be in attendance at this meeting.
Page 7 of 80
Page 8 of 80
Page 1 of 2
REPORT OF THE CITY PLAN COMMISSION
October 21, 2025 – 6:00 PM
933 Michigan Ave, Stevens Point, WI 54481
PRESENT: Alderperson Kneebone, Commissioner Arntsen, Commissioner Beacom, Commissioner Rice,
Commissioner Schuler
EXCUSED: Mayor Wiza, Commissioner Miskowiak
ALSO PRESENT: Associate Planner / Zoning Administrator Kuhn, Community Development Director
Kivela, Planning Intern Sager
INDEX:
Opening Section:
1. Roll Call
Discussion and Possible Action on the Following:
2. Presentation and discussion on the preliminary policy direction report for the Zoning Code
rewrite.
3. Discussion on project schedule – draft and refinement stage of the Zoning Code rewrite.
4. First review of draft purpose statements – Zoning, Sign, & Subdivision Ordinances.
Closing Section:
5. Adjourn
Opening Section:
1. Roll Call
Present: Kneebone, Arntsen, Beacom, Rice, Schuler
Excused: Wiza, Miskowiak
Discussion and Possible Action on the Following:
2. Presentation and discussion on the preliminary policy direction report for the Zoning Code rewrite.
Associate Planner / Zoning Administrator Kuhn presented the purpose of the preliminary policy
direction report, noting that its overall goals are to identify broad policy areas for consideration
when performing the rewrite and to remain aligned with the 2005 Comprehensive Plan and the
feedback collected through various community engagement venues. Kuhn then invited the
Commission to review and refine the preliminary recommendations, which are organized into
the following topics, as outlined below:
1. Housing
2. Transportation
3. Natural, Environmental, and Ecological Resource Protection
4. Site Design
5. Zoning Map
Page 9 of 80
Page 2 of 2
6. Signage and Subdivision Regulations
7. Miscellaneous Recommendations
8. Areas Where Direction is Needed
No action was taken.
3. Discussion on project schedule – draft and refinement stage of the Zoning Code rewrite.
Associate Planner / Zoning Administrator Kuhn stated that, following the completion of the
initial public engagement phase, the next stage of the rewrite will comprise of drafting and
refining ordinance sections. Kuhn noted that the draft ordinance sections will be reviewed
sequentially, with the overall timeline remaining flexible determined by the pace and
completion of prior section revisions. Kuhn encouraged the Commission, when prompted, to
diligently review and provide recommendations for the drafts to support the development of
the most optimal result.
No action was taken.
4. First review of draft purpose statements – Zoning, Sign, & Subdivision Ordinances.
Associate Planner / Zoning Administrator Kuhn shared the first draft ordinance section which
included the purpose statements for the Zoning, Sign, and Subdivision Ordinances. These draft
purpose statements were completely rewritten from the existing code to achieve the following,
as outlined below:
• Enhance visual appeal
• Eliminate redundancy
• Eliminate statement areas where the City is statutorily obligated to fulfill
Kuhn then opened the discussion to the Commission to provide revisions and recommendations
to strength the draft purpose statements.
No action was taken.
Closing Section:
5. Adjourn
Meeting adjourned at 8:18 PM.
A recording of this meeting can be viewed/heard at: https://stevenspoint.com/365/AgendasMinutesVideos
Page 10 of 80
Page 1 of 7
Administrative Staff Report
Department of Community
Development
Construct an Accessory Structure Using
Traditional Neighborhood Setbacks
1208 Wisconsin Street
November 3, 2025
Applicant(s):
• Dustin Haugen
Staff:
• Adam Kuhn, Associate Planner
akuhn@stevenspoint.com
Parcel Number(s):
• 281240832400814
Zone(s):
• “R-3” Single- and Two-Family
Residential
Master Plan:
• Residential
Council District:
• District 9 | Ald. Lang
Lot Information:
• Frontage: 50.25 ft.
• Depth: 70 ft.
• Lot Size: 3,517 sq. ft. (0.08 ac.)
Current Use:
• Single-family residence
Applicable Regulations:
• 23.02(1)(h)(3)
Request
1. Public Hearing and action on a request from Dustin Haugen for a
conditional use permit to construct an accessory structure on the
property located at 1208 Wisconsin Street (Parcel ID
281240832400814) utilizing “R-TND” Traditional Neighborhood
Overlay District setback requirements, consistent with Ch.
23.02(1)(h)(3).
Attachment(s)
1. Application
2. Plans
Findings of Fact
1. The applicant is requesting to construct an accessory structure on
the northwest corner of the subject property.
2. Detached garages are required to have a minimum three-foot side
yard and rear yard setback provided that the garage is set back at
least ten feet from the principal structure on the subject property
and does not exceed 15 feet in height.
3. A one-foot setback from the west and north lot lines is requested.
4. The subject property is located within the “R-TND” Traditional
Neighborhood Overlay District. The “R-TND” District allows, via a
conditional use permit, lesser setback requirements to construct
detached garages.
5. The Plan Commission and Common Council may attach additional
conditions onto this request as necessary.
Staff Recommendation
Approve the request for a conditional use permit to construct an accessory
structure using setback requirements of the “R-TND” Traditional
Neighborhood Overlay District for the property located at 1208 Wisconsin
Street (Parcel ID 281240832400814), subject to the following conditions:
1. A building permit shall be obtained prior to the start of construction.
2. Staff shall have the ability to approve minor amendments to the
proposed project plan.
Page 11 of 80
Page 2 of 7
Vicinity Map
Background
Overview: The applicant is requesting a conditional use permit to construct an accessory structure near the northwest
corner of the subject property. The construction of accessory structures is required to meet the principal structure
setback requirements for the zoning designation of the property for which the structure is proposed to be located. With
that said, the City’s Zoning Code provides modified setback requirements for accessory structures for all zoning districts.
Section 23.01(10) of the City’s Zoning Code allows a minimum three-foot side and rear setback for an accessory building
provided that 1.) the structure is separated at least ten feet from the principal structure that is located on the property
and 2.) that the height of the structure does not exceed 15 feet.
The subject property is located within the “R-TND” Traditional Neighborhood Overlay District. The “R-TND” Overlay
District, created in the early-2000s as a result of then-newly adopted comprehensive planning and smart growth
legislation in Wisconsin, is intended to allow for the development and redevelopment of land consistent with design
principles found within a specific traditional neighborhood. For properties within the “R-TND” District, lesser setbacks
are available, via a conditional use permit, to construct an accessory structure. Said conditional use setback
requirements are found below.
Ch. 23.02(1)(h)(3) Conditional Use Setback Requirements
Detached Garage
• Street front setback – 20 feet
• Corner side yard – 12 feet, with no access to a public street
• Interior side yard – 1 foot
• Rear yard – 1 foot
Page 12 of 80
Page 3 of 7
The applicant is requesting a one-foot setback from the north and west lot lines. As the subject property is located
within the “R-TND” District, a conditional use permit is required to allow for the requested setback. An analysis of this
request relative to the City’s fourteen standards for reviewing a conditional use request are outlined below.
Standards of Review – Conditional Use Permit
1. The establishment, maintenance, or operation of the use will not be detrimental to, or endanger the public
health, safety, morals, comfort, or general welfare.
Analysis: The proposed use is consistent with the City’s Comprehensive Plan and the existing surrounding uses
are unlikely to be negatively impacted by this request. The proposed accessory structure is customary for
residential uses in the city, and its location in the rear yard of the subject property will better shield its visibility
from Wisconsin Street. Although the proposed structure is proposed to have a one-foot side and rear setback,
building codes will apply for the construction of this garage to provide additional safeguards to adjacent
properties.
Findings: The subject property, zoned “R-3” Single- and Two-Family Residential, permits the construction of
accessory structures so long as the cumulative size of all structures on the property do not exceed 900 square
feet. Staff does not believe the proposed conditional use permit with the conditions outlined above would be
detrimental to, or endanger the public health, safety, morals, comfort, or general welfare.
2. The use will not be injurious to the
use and for the purpose already
permitted, nor substantially
diminish and impair property
values.
Analysis: The construction of an
accessory structure is permitted on
the subject property so long as the
size and location standards found
within the Zoning Code are met.
Findings: Single- and two-family
residential uses surround the
subject property, most with their
own accessory structures. Staff
believes that the construction of an
accessory structure would not be
contrary to uses allowed within the
“R-3” District.
3. The establishment of the use will not impede the normal and orderly development and improvement of the
surrounding property for uses permitted in the district.
Analysis: The respective area is in an established and developed area of the city. The City’s Comprehensive Plan
identifies this area for residential uses (i.e., single-family and two-family residential uses).
“R-TND” Traditional Neighborhood Overlay District
Page 13 of 80
Page 4 of 7
Findings: See standards one and two above. The applicant’s proposal will not impede on the normal and orderly
development and improvement of the surrounding area.
4. The exterior architectural appeal and function plan of any proposed structure will not be variance with either
the exterior architectural appeal and function plan, and scale of the structures already constructed or in the
course of construction in the immediate neighborhood or in the character of the applicable district so as to
result in a substantial or undue adverse effect on the neighborhood.
Analysis: The applicant is planning to utilize the
same siding material on the accessory structure as
what exists on the house. An overhead door is
proposed on the front elevation of the structure,
while windows are planned along the side
elevations. Dormer windows are being consider,
however are not finalized at this time.
Findings: Staff believes that this standard is met.
The purpose of the “R-TND” District, in part, is to
ensure that street elevations on primary and
accessory buildings does not consist of a blank wall,
but rather architectural elements such as doors and
windows. By having an overhead door, along with a
variety of exterior wall materials and an improved
fenestration pattern, staff believes that the
appearance of this structure will be similar to
garages constructed on other residential lots in the city.
5. Adequate utilities, access roads, drainage and/or facilities have been, or are being, provided.
Analysis: Utility connections are not planned as part of this development. If needed in the future, appropriate
connections exist off of Wisconsin Street. Access to the proposed garage will be via an existing driveway located
off of Wisconsin Street. Given the reduced size allowed for accessory structures on the subject property (plus or
minus 200 sq ft), drainage issues are not anticipated that warrants additional stormwater controls on the subject
property.
Findings: Staff believes that this standard is met.
6. Adequate measures have been, or will be taken, to provide ingress and egress so designed to minimize traffic
congestion in the public streets.
Analysis: The proposed use will be serviced by an existing driveway off of Wisconsin Street.
Findings: Staff believes that access is appropriate and is not anticipated to incur additional traffic congestion on
Wisconsin Street.
Page 14 of 80
Page 5 of 7
7. The proposed use is not contrary to the objectives of any duly adopted land use plan for the City of Stevens
Point and any of its components.
Analysis: The City’s 2005 Comprehensive Plan Future Land Use Map has identified the subject property for
residential (i.e., single- and two-family) uses. The subject property is zoned “R-3” Single- and Two-Family
Residential. According to the City’s Zoning Code, the intent of the “R-3” District is to “provide for both single-
family residences and two-family residences intended particularly to act as a transition district between lower
intensity uses
such as
permitted in
"C", "R-1" and
"R-2" districts
and higher
intensity
districts,
consistent with
the City's
Comprehensive
Plan. This
district is
intended to be
provided for all
lands where sewer
and water is or will
be required.”
Findings: Staff
believes that this
request meets the
intent of the “R-3”
District as garages
are intended to
support single- and
two-family
residential living.
8. The use shall, in all other respects, conform to the applicable regulations of the district in which it is located,
except as such regulations may, in each instance, be modified pursuant to the recommendations of the Plan
Commission.
Analysis: This conditional use request is seeking to construct an accessory structure with a one-foot setback side
and rear setback.
Findings: The regulations of the district are met provided that the above permit conditions are fulfilled.
Subject Property
Subject Property
Page 15 of 80
Page 6 of 7
9. The proposal will not result in result in an over-concentration of high-density living facilities in one area so as
to result in a substantial or undue adverse effect on the neighborhood, on the school system, and the social
and protective systems of the community.
Analysis: N/A
Findings: N/A
10. Access to the site shall be safe.
Analysis: Vehicular and pedestrian access to the site is off of Wisconsin Street.
Findings: As additional traffic is not anticipated as part of constructing this accessory structure, staff believes
that access to the property is appropriate.
12. There shall be adequate utilities to serve the site.
a. The Public Works Director, Police Chief and Fire Chief shall determine whether there is adequate
sanitary sewer, portable water, storm drainage, street capacity, emergency access, public protection
services, and other utilities to serve the proposed development. They shall review the plan to ensure
safety and access for safety vehicles.
Analysis: While utility connections for the subject property exists off of Wisconsin Street, access to
utility infrastructure is not proposed as part of the proposed development.
Findings: This standard is met.
13. The privacy of the neighboring development and the proposed development shall be maintained as much as
practical. Guidelines:
a. Mechanical equipment including refuse storage shall be screened from neighboring properties.
Analysis: Mechanical equipment is not proposed as part of this proposed use.
Findings: This standard is met.
b. Lighting shall be located to minimize intrusion onto neighboring properties.
Analysis: While exterior light fixtures are proposed on the garage’s south-facing wall, the setback
provided from Wisconsin Street should minimize light pollution onto the public right-of-way.
Findings: This standard is met.
c. Sources of noise shall be located in a manner that minimizes impact to neighboring properties.
Analysis: The use will be operating within the confines of the building and property.
Findings: The use should not create excessive noise.
Page 16 of 80
Page 7 of 7
14. Principal – Applications for exclusive multi-family residential uses. Landscaping shall be provided, or existing
landscape elements shall be preserved to maintain a sense of residential character, define boundaries, and to
enhance the sense of enclosure and privacy.
Analysis: N/A
Findings: N/A
Based on the findings above, staff would recommend approval of the conditional use permit with the conditions
outlined on page one. Please keep in mind that State legislation has placed limitations on local jurisdictions regarding
the denial of conditional use permits. Conditional use permits shall be reviewed by a means to permit a use under
certain conditions applied to the use or property. For example, if a concern is raised regarding to a standard above, a
condition can be applied to the permit to address the concern and grant the permit.
Page 17 of 80
Page 18 of 80
Legal Description of Subject Property
Designated Future Land Use Category Current Use of Property
Residential, Home
Explain the land use and the development proposed for the subject property. Include the time schedule (if any) for development. (Use additional pages
if necessary)
Garage: Designed to accommodate the small sized property.
Fence: enclosing the property to safely allow children and pet to play.
Driveway: Property currently has a gravel drive. We would like to make that a hard surface for clean and safe movement from car to home, etc. How will the proposed development reinforce the existing or planned character of the neighborhood? (Use additional pages if necessary)
Application for a Conditional Use Permit Page 1 of 2
We purchased this home because we are avid lovers of historic homes. This 1925 Craftsman style home is very appealing to us. So much so, we hope to bring back some of
the original trims and treatments to make a warm and welcoming home. The design of the enhancements are directly influenced by the craftsman style.
Outline steps that will be taken to reduce any negative impacts on adjacent property. (Use additional pages if necessary)
Pleasing Thought Through Design,
Quality Construction,
Appropriate Materials,
Finish treatments, such as trim/paint, to match the home (which will also be freshly painted),
and finally landscaping to visually please and support the comfortable use of the home.
As a new family in the neighborhood, we have been warmly welcomed by many neighbors. During these interactions, we have heard numerous stories
expressing frustration with past ownership of the property. Neighbors disliked the negative use. Apparently there were cars on blocks, trash piled along thee
edges of the property, odors from human, and animal activities wafting from the home/property. And finally, the general appearance; overgrown and uncared for
landscaping, etc. We hope to vastly improve and ultimately eliminate concerns by making the home beautiful with much curb appeal.
Current Zoning Surrounding Subject Property
North: South:
East: West:
Current Land Use Surrounding Subject Property
North: South:
East: West:
Page 19 of 80
EXHIBITS
Owner Information Sheet Additional Exhibits If Any:
Letter to District Alderperson
Maps (vicinity, zoning, floodplains, wetlands others as requested by staff)
Site Plan (designating primary, side, and service street frontages) X
Building Elevations
Parking Plan (Location, number of spaces, reductions, and design and landscaping) X
Street Plan with Cross-sections
Utility Plan
Landscape Plan (including any equivalent alternative landscaping requests)
Stormwater Plan
Outdoor Lighting Plan (location of fixtures, illumination levels)
CERTIFICATION AND SIGNATURE
By my signature below, I certify that the information contained in this application is true and correct to the best of my knowledge at the time of the application. I
acknowledge that I understand and have complied with all of the submittal requirements and procedures and that this application is a complete application submittal.
I further understand that an incomplete application submittal may cause my application to be deferred to the next posted deadline date.
Signature of Applicant Date Signature of Property Owner(s) Date
Dustin Haugen + Kristina Sneshkoff 10/09/2025 DJ Haugen Krissy Sneshkoff 10/09/2025
Application for a Conditional Use Permit Page 2 of 2
Page 20 of 80
Page 1 of 6
Administrative Staff Report
Department of Community
Development
Operate a One-Unit Residence
2877 Church Street
November 3, 2025
Applicant(s):
• Thomas Bushman
Staff:
• Adam Kuhn, Associate Planner
akuhn@stevenspoint.com
Parcel Number(s):
• 281230805101713
Zone(s):
• “B-4” Commercial
Master Plan:
• Commercial / Office / Multi-
Family
Council District:
• District 5 | Ald. Birr
Lot Information:
• Frontage: 197 ft.
• Depth: 121 ft.
• Lot Size: 13,365 sq. ft. (13,365 ac.)
Current Use:
• Residential and office
Applicable Regulations:
• 23.02(2)(a)(3)(d)
Request
1. Public Hearing and action on a request from Thomas Bushman for a
conditional use permit to operate a single-family residence on the
property located at 2877 Church Street (Parcel ID
281230805101713), consistent with Ch. 23.02(2)(a)(3)(d).
Attachment(s)
1. Application
Findings of Fact
1. The subject property is home to an office space on the main level,
along with multiple residential units within the main level and
basement.
2. The subject property is zoned “B-4” Commercial. Within the “B-4”
District, office spaces are a permitted use and any residential units
are a conditional use. According to archival records, a conditional
use was not granted for the residential use – an item that was
required decades ago. Code enforcement action began with the
Building Inspection Division, and the applicant is now wishing to
create one residential unit in the building.
3. The applicant is interested in occupying this one-unit residence. In
order for that to occur, a conditional use permit would need to be
granted.
4. The Plan Commission and Common Council may attach conditions
onto this request as necessary.
Staff Recommendation
Approve the conditional use permit to operate a one-unit residence on the
property located at 2877 Church Street (Parcel ID 281240832402902),
subject to the following conditions:
1. The dwelling unit shall meet minimum occupancy and space
requirements as outlined in Chapters 21 & 30 of the City’s Municipal
Code of Ordinances.
2. Staff shall have the ability to approve minor deviations to the project
plan.
Page 21 of 80
Page 2 of 6
Vicinity Map
Background
Overview: The applicant is requesting a conditional use permit to occupy a one-unit residence on the subject property.
The subject property is home to an office space on the main level, along with multiple residential units within the main
level and basement. “B-4” Commercial is the zoning designation of the subject property. Within the “B-4” District, office
spaces are a permitted use and any residential units are a conditional use. According to archival records, a conditional
use was not granted for the residential use – an item that was required decades ago. Code enforcement action began
with the Building Inspection Division, and the applicant is now wishing to create one residential unit in the building. The
applicant is interested in occupying this one-unit residence. In order for that to occur, a conditional use permit would
need to be granted.
An analysis of this request relative to the City’s fourteen standards for reviewing a conditional use request are outlined
below.
Standards of Review – Conditional Use Permit
1. The establishment, maintenance, or operation of the use will not be detrimental to, or endanger the public
health, safety, morals, comfort, or general welfare.
Page 22 of 80
Page 3 of 6
Analysis: The proposed use is consistent with the City’s Comprehensive Plan and the existing surrounding uses
are unlikely to be negatively impacted by this request. The retail store on the main level of the building will still
be a predominant land use for the subject property. Located along Church Street, the use of the subject
property for both commercial and residential uses is consistent with nearby existing land uses along this street
corridor. Adequate utility and road networks exist to compliment this request, with dedicated access off of
Church Street.
Findings: The “B-4” Commercial District allows for one-unit dwellings as a conditional use. No improvements are
proposed to the exterior of the building and to the site to service the proposed use. Staff does not believe the
proposed conditional use permit with the conditions outlined above would be detrimental to, or endanger the
public health, safety, morals, comfort, or general welfare.
2. The use will not be injurious to the use and for the purpose already permitted, nor substantially diminish and
impair property values.
Analysis: One-unit dwellings are a conditional use within the “B-4” Commercial District.
Findings: Commercial and single-family residential land uses surround the property where it is permitted by
right. Staff believes that this proposal would not pose a detriment to the existing residential neighborhood
nearby.
3. The establishment of the use will not impede the normal and orderly development and improvement of the
surrounding property for uses permitted in the district.
Analysis: The respective area is in an established and developed area of the city. The City’s Comprehensive Plan
identifies this area for commercial, office and multi-family residential uses.
Findings: See standards one and two above. The applicant’s proposal will not impede on the normal and orderly
development and improvement of the surrounding area.
4. The exterior architectural appeal and function plan of any proposed structure will not be variance with either
the exterior architectural appeal and function plan, and scale of the structures already constructed or in the
course of construction in the immediate neighborhood or in the character of the applicable district so as to
result in a substantial or undue adverse effect on the neighborhood.
Analysis: The exterior of the building is not proposed to change as part of this request.
Findings: Staff believes that the existing building complements both the nearby residential neighborhood to the
south and the commercial corridor along Church Street.
5. Adequate utilities, access roads, drainage and/or facilities have been, or are being, provided.
Analysis: Utilities exist within the Church Street Right-of-Way that services the proposed use. New connections
would not be necessary as the principal structure is already built to accommodate a one-unit residence. Access
onto the subject property is off of Church Street.
Findings: Staff believes that this standard is met.
6. Adequate measures have been, or will be taken, to provide ingress and egress so designed to minimize traffic
congestion in the public streets.
Page 23 of 80
Page 4 of 6
Analysis: The proposed use will be serviced by a parking area off of Church Street.
Findings: Staff believes that access is appropriate and that the proposed single-family use would not create
significant issues with traffic mobility.
7. The proposed use is not contrary to the objectives of any duly adopted land use plan for the City of Stevens
Point and any of its components.
Analysis: The
City’s 2005
Comprehensive
Plan Future
Land Use Map
has identified
the subject
property for
commercial,
office and
multi-family
residential
uses. The
subject property is zoned
“B-4” Commercial.
According to the City’s
Zoning Code, the intent
of the “B-4” District is to
“provide for retail,
commercial, office,
service and apartment
uses in areas of good
accessibility along
arterial streets
consistent with the City's
Comprehensive Plan.
This district is primarily intended to accommodate general commercial uses requiring on-site parking and
arterial access.”
Findings: Staff believes that this request meets the intent of the “B-4” District as it provides both retail and
residential land uses. Given the layout of the principal building, a primary land use of the subject property will be
for retail purposes – further meeting the intent to allow for commercial land uses located on an adjacent arterial
street (i.e., Church Street).
Subject Property
Subject Property
Page 24 of 80
Page 5 of 6
8. The use shall, in all other respects, conform to the applicable regulations of the district in which it is located,
except as such regulations may, in each instance, be modified pursuant to the recommendations of the Plan
Commission.
Analysis: This conditional use request is seeking to convert multiple nonconforming dwelling units into one
housing unit. One-unit residential uses are a conditional use within the “B-4” District.
Findings: The regulations of the district are met provided that the above permit conditions are fulfilled.
9. The proposal will not result in result in an over-concentration of high-density living facilities in one area so as
to result in a substantial or undue adverse effect on the neighborhood, on the school system, and the social
and protective systems of the community.
Analysis: One residential unit is proposed to be occupied. The proposed use would provide a similar land use
intensity within adjoining properties.
Findings: Occupying one housing unit will not result in an over-concentration of high-density living facilities in
one area so as to result in a substantial or undue adverse effect on the neighborhood, on the school system, and
the social and protective services systems of the community. This standard is met.
10. Principal – Applications for exclusive multi-family residential uses: The view from the street should maintain a
residential character. The view should not be dominated by the building and not by garages, parking,
mechanical equipment, garbage containers, or other storage.
Analysis: N/A
Findings: N/A
11. Access to the site shall be safe.
Analysis: Vehicular access to the site is off of Church Street.
Findings: Based on the low-intensity land use that is being proposed, staff believes that access to the property is
appropriate.
12. There shall be adequate utilities to serve the site.
a. The Public Works Director, Police Chief and Fire Chief shall determine whether there is adequate
sanitary sewer, portable water, storm drainage, street capacity, emergency access, public protection
services, and other utilities to serve the proposed development. They shall review the plan to ensure
safety and access for safety vehicles.
Analysis: Utility connections exist within the Church Street Right-of-Way that services the principal
structure on the property.
Page 25 of 80
Page 6 of 6
Findings: As no exterior improvements are proposed as part of this request, staff believes that fire
access and stormwater controls are sufficient.
13. The privacy of the neighboring development and the proposed development shall be maintained as much as
practical. Guidelines:
a. Mechanical equipment including refuse storage shall be screened from neighboring properties.
Analysis: Mechanical equipment is not proposed as part of this proposed use.
Findings: This standard is met.
b. Lighting shall be located to minimize intrusion onto neighboring properties.
Analysis: Outside of existing light coming from the building, no additional lighting is proposed.
Findings: Lighting would be provided by the building.
c. Sources of noise shall be located in a manner that minimizes impact to neighboring properties.
Analysis: The use will be operating within the confines of the building and property.
Findings: The use should not create excessive noise.
14. Principal – Applications for exclusive multi-family residential uses. Landscaping shall be provided, or existing
landscape elements shall be preserved to maintain a sense of residential character, define boundaries, and to
enhance the sense of enclosure and privacy.
Analysis: N/A
Findings: N/A
Based on the findings above, staff would recommend approval of the conditional use permit with the conditions
outlined on page one. Please keep in mind that State legislation has placed limitations on local jurisdictions regarding
the denial of conditional use permits. Conditional use permits shall be reviewed by a means to permit a use under
certain conditions applied to the use or property. For example, if a concern is raised regarding to a standard above, a
condition can be applied to the permit to address the concern and grant the permit.
Page 26 of 80
Page 27 of 80
Page 28 of 80
Page 1 of 8
Administrative Staff Report
Department of Community
Development
Construct Multi-Family Buildings
Unaddressed Parcel off of Songbird Lane
November 3, 2025
Applicant(s):
• Jim Lundberg, representing Point
Crossing LLC
Staff:
• Adam Kuhn, Associate Planner
akuhn@stevenspoint.com
Parcel Number(s):
• 281240836220063
Zone(s):
• “B-5” Highway Commercial
Master Plan:
• Commercial/Office/Multi-Family
Council District:
• District 7 | Ald. Kneebone
Lot Information:
• Lot Size: 196,463 sq. ft. (4.510 ac.)
Current Use:
• Undeveloped
Applicable Regulations:
• 23.01(14)(f)
• 23.02(1)(f)(3)(b)
Request
1. Public Hearing and action on a request from Jim Lundberg,
representing Point Crossing LLC, for a conditional use permit to
construct multiple multi-family residential buildings on an
unaddressed parcel bounded by Songbird Lane (Parcel ID
281240836220063), consistent with Ch. 23.01(14)(f) & Ch.
23.02(1)(f)(3)(b).
2. A request from Jim Lundberg, representing Point Crossing LLC, for a
site plan review to construct multiple multi-family residential
buildings on an unaddressed parcel bounded by Songbird Lane
(Parcel ID 281240836220063), consistent with Ch. 23.02(2)(e)(5).
Attachment(s)
1. Application
2. Plans
Findings of Fact
1. The applicant is requesting to construct nine fourplexes on the
subject property, along with two six-stall garage complexes.
2. The proposed housing units would be two stories and contain a one-
stall attached garage, three bedrooms and two bathrooms.
3. Additional surface parking is provided in front of each attached
garage.
4. The subject property is zoned “B-5” Highway Commercial. Within the
“B-5” District, multi-family residential development (3+ units)
requires a conditional use permit. Additionally, a conditional use
permit is required if more than one principal structure is on the
same lot.
5. Within the “B-5” District, new construction requires a site plan
review due to the area’s adjacency to U.S. Highway 10 East.
6. The Plan Commission and Common Council may attach additional
conditions onto this request as necessary.
Staff Recommendation
Approve the conditional use permit and site plan review to construct multiple multi-
family residential buildings on an unaddressed parcel bounded by Songbird Lane
(Parcel ID 281240836220063), subject to the following conditions:
Page 29 of 80
Page 2 of 8
1. The final landscaping plan shall meet minimum clearview
requirements as outlined in Section 23.01(17)(b)(3) of the City’s
Zoning Code.
2. The applicant shall submit to the City a wetland delineation report of
the subject property.
3. One additional fire hydrant shall be installed, subject to the review
and approval of the City Fire Marshal.
4. A maintenance agreement for the additional fire hydrant shall be
executed and recorded with the Portage County Register of Deeds
Office.
5. Sidewalk shall be installed along the north side of Windy Drive,
meeting minimum design standards as required by the City Engineer.
6. An access agreement for utility access shall be executed and
recorded with the Portage County Register of Deeds Office.
7. The proposed temporary turnaround shall meet minimum design
standards as required by the City Fire Marshal.
8. A building permit shall be obtained prior to the start of construction.
9. Staff shall have the ability to approve minor amendments to the
proposed project plan.
Vicinity Map
Background
Overview: The applicant is requesting to construct nine fourplexes on the subject property, along with two six-stall
garage complexes. The proposed housing units would be two stories and contain a one-stall attached garage, three
bedrooms and two bathrooms. Additional surface parking is provided in front of each attached garage. The subject
Page 30 of 80
Page 3 of 8
property is zoned “B-5” Highway Commercial. Within the “B-5” District, multi-family residential development (3+ units)
requires a conditional use permit. Additionally, a conditional use permit is required if more than one principal structure
is on the same lot. As the property is zoned “B-5” Highway Commercial, new construction also requires a site plan
review due to the area’s adjacency to U.S. Highway 10 East.
Standards of Review – Conditional
Use Permit
1. The establishment, maintenance, or
operation of the use will not be
detrimental to, or endanger the public
health, safety, morals, comfort, or general
welfare.
Analysis: The proposed use is consistent
with the City’s Comprehensive Plan and the
existing surrounding uses are unlikely to be
negatively impacted by this request. The
proposed multi-family development is
consistent with other land uses close by,
and its location more than one block away
from Highway 10 will better address traffic
circulation in this area of the city.
Findings: The subject property, zoned “B-5”
Highway Commercial, permits the
construction of multi-family residential
buildings via a conditional use permit and
site plan review. Staff does not believe the
proposed conditional use permit with the
conditions outlined above would be
detrimental to, or endanger the public
health, safety, morals, comfort, or general
welfare.
2. The use will not be injurious to the use and for the purpose already permitted, nor substantially diminish and
impair property values.
Analysis: The construction of several multi-family buildings are permitted on the subject property so long as
minimum performance standards in the City’s Zoning Code.
Findings: Multi-family residential uses and auto-centric commercial uses surround the subject property. Staff
believes that the proposed development would not be contrary to uses allowed within the “B-5” District and
existing uses in the general vicinity.
3. The establishment of the use will not impede the normal and orderly development and improvement of the
surrounding property for uses permitted in the district.
Page 31 of 80
Page 4 of 8
Analysis: The respective area is in an established and developed area of the city. The City’s Comprehensive Plan
identifies this area for commercial, office and multi-family residential development.
Findings: See standards one and two above. The applicant’s proposal will not impede on the normal and orderly
development and improvement of the surrounding area.
4. The exterior architectural appeal and function plan of any proposed structure will not be variance with either
the exterior architectural appeal and function plan, and scale of the structures already constructed or in the
course of construction in the immediate neighborhood or in the character of the applicable district so as to
result in a substantial or undue adverse effect on the neighborhood.
Analysis: Composite siding is proposed on all structures. The multi-family buildings will have overhead garage
doors, a front door and a sliding patio door on the first floor. The second floor will consist of windows for the
bedrooms and bathrooms. External light fixtures are planned next to the garage door and patio door. Similar
siding material is proposed for the two garage buildings.
Findings: Staff believes that this standard is met. The proposed building design is consistent with other multi-
family development in this area of the city. An adequate roof pitch and fenestration pattern exists to provide
aesthetic variation.
5. Adequate utilities, access roads, drainage and/or facilities have been, or are being, provided.
Page 32 of 80
Page 5 of 8
Analysis: Utility connections exist within the Songbird Lane and Windy Drive Right-of-Ways to support the
proposed development. Access is proposed off of both Windy Drive and Songbird Lane. As this will be a phased
development, access will initially be created off of Windy Drive and terminate into a temporary gravel
turnaround until the final phase is complete and another access point is created off of Songbird Lane. Three
infiltration basins are proposed and are scattered proportionally across the subject property.
Findings: Staff believes that this standard is met.
6. Adequate measures have been, or will be taken, to provide ingress and egress so designed to minimize traffic
congestion in the public streets.
Analysis: Access is planned off of Windy Drive and Songbird Lane.
Findings: Staff believes that access is appropriate with the additional traffic generated from this development.
7. The proposed use is not contrary to the objectives of any duly adopted land use plan for the City of Stevens
Point and any of its components.
Analysis: The City’s 2005 Comprehensive Plan Future Land Use Map has identified the subject property for
commercial, office and multi-family residential land uses. The subject property is zoned “B-5” Highway
Commercial. According to the City’s Zoning Code, the intent of the “B-5” District is “to provide for larger retail,
commercial, office, and service uses which depend upon access to major highways. This district is primarily
intended to accommodate regional commercial uses requiring larger land areas than the "B-4" Commercial
District and
which
depend upon
region-wide
usage and
region-wide
access. It is
the intent of
this district to
provide for
open space,
to prevent
congestion,
to protect the highway corridor, to protect the safety of the users of the adjacent highway and the users of the
commercial sites of this district, to protect property values, and to create a convenient and safe commercial
area.”
Findings: Staff believes that this request meets the intent of the “B-5” District as garages are intended to
support the proposed development.
Subject Property
Page 33 of 80
Page 6 of 8
8. The use shall, in all other respects, conform to the applicable regulations of the district in which it is located,
except as such regulations may, in each instance, be modified pursuant to the recommendations of the Plan
Commission.
Analysis: This conditional use request is seeking to construct multiple multi-family residential buildings on the
subject property.
Findings: The regulations of the district are met provided that the above permit conditions are fulfilled.
9. The proposal will not result in result in an over-concentration of high-density living facilities in one area so as
to result in a substantial or undue adverse effect on the neighborhood, on the school system, and the social
and protective systems of the community.
Analysis: 36 housing units would be created as part of this proposed development. Staff believes that 36
additional units, and roughly 62 additional persons residing on the subject property based on average household
size, should not pose an adverse impact on the surrounding neighborhood, social and protective services that
cover this area.
Findings: This standard is met.
10. Access to the site shall be safe.
Analysis: Vehicular access is off of Songbird Lane and Windy Drive. As a condition of approval, sidewalk is
required to be installed on the north side of Windy Drive to support pedestrian access for this development.
Findings: With 36 housing units being served by two access points, staff believes that access to the property is
appropriate.
12. There shall be adequate utilities to serve the site.
a. The Public Works Director, Police Chief and Fire Chief shall determine whether there is adequate
sanitary sewer, portable water, storm drainage, street capacity, emergency access, public protection
services, and other utilities to serve the proposed development. They shall review the plan to ensure
safety and access for safety vehicles.
Analysis: Utility connections exist to support the proposed development. Adequate stormwater controls
are proposed in the site plan, and the surrounding road network is designed to support emergency
services.
Findings: This standard is met.
13. The privacy of the neighboring development and the proposed development shall be maintained as much as
practical. Guidelines:
a. Mechanical equipment including refuse storage shall be screened from neighboring properties.
Page 34 of 80
Page 7 of 8
Analysis: Two trash enclosures are proposed – one on the north end of the subject property and the
other close to Windy Drive.
Findings: The proposed trash enclosures are screened from public view based on the location of
residential buildings and additional landscaping being planted.
b. Lighting shall be located to minimize intrusion onto neighboring properties.
Analysis: Light fixtures are proposed on the front and rear elevations for each housing unit. No light
fixtures are proposed in the parking lot.
Findings: Staff believes that the created light should not be intrusive to neighboring properties.
c. Sources of noise shall be located in a manner that minimizes impact to neighboring properties.
Analysis: The use will be operating within the confines of the building and property.
Findings: The use should not create excessive noise.
14. Principal – Applications for exclusive multi-family residential uses. Landscaping shall be provided, or existing
landscape elements shall be preserved to maintain a sense of residential character, define boundaries, and to
enhance the sense of enclosure and privacy.
Analysis: Trees are proposed to be planted along both street frontages, and shrubs are proposed in front of
each housing unit.
Findings: Staff believes that an adequate amount of landscaping is proposed to provide character to the
property.
Based on the findings above, staff would recommend approval of the conditional use permit with the conditions
outlined on page one. Please keep in mind that State legislation has placed limitations on local jurisdictions regarding
the denial of conditional use permits. Conditional use permits shall be reviewed by a means to permit a use under
certain conditions applied to the use or property. For example, if a concern is raised regarding to a standard above, a
condition can be applied to the permit to address the concern and grant the permit.
Standards of Review – Site Plan Review
1. Setbacks.
Analysis: The following are the building setback requirements of the “B-5” Highway Commercial District – 25’
street setback, 10’ side yard setback and a 20’ rear yard setback. Note that more stringent street setbacks exist
for properties abutting Highway 10 East in accordance with Wisconsin Department of Transportation
requirements.
Findings: The setbacks that are provided meet minimum requirements for the “B-5” District.
Page 35 of 80
Page 8 of 8
Lot Line B-5 Setback Requirements Proposed Setbacks
Street 40 feet – U.S. Highway 10 East
25 feet – Brilowski Road
25 feet off of Songbird Lane
43 feet off of Windy Drive
Side 10 feet 23 feet
Rear 20 feet 30 feet
2. Density.
Analysis: Within the “B-5” District, all allowed uses are required to have a minimum lot size of 35,000 sq ft.
Please note that unlike other commercial zoning districts, the “B-5” District does not differentiate in lot size
requirements for residential and non-residential developments.
Findings: The subject property is over 35,000 square feet in size and meets density requirements.
3. Building Height.
Analysis: Building walls will be over 18 feet in height and will have a 4/12 roof pitch.
Findings: Buildings within the “B-5” District are restricted to a max height of 35 feet. Structures may surpass 35
feet in height, at a height not to exceed 125 feet, if a fire prevention system exists that is approved by the Fire
Department.
4. Access and Internal Traffic Flow.
Analysis: Two access points are proposed – one off of Songbird Drive and the other off of Windy Drive. As noted
earlier, access will initially be created off of Windy Drive and terminate into a temporary turnaround until
subsequent construction phases are completed. After the third and final construction phase is complete, the
access off of Songbird Lane will be created. An internal driveway will service the proposed buildings and meets
minimum width requirements in the City’s Zoning Code.
Findings: Staff believes that the driveway is built appropriately to handle the additional traffic volume expected
within this development.
5. Parking.
Analysis: 63 parking stalls are required. 48 parking stalls are provided, which includes the attached garages and
two six-stall garage complexes. 36 additional outdoor parking stalls are provided next to each housing unit.
Findings: The amount of off-street parking provided meets minimum parking requirements in the City’s Zoning
Code.
Page 36 of 80
Page 37 of 80
Page 38 of 80
Page 39 of 80
Page 40 of 80
Page 41 of 80
Point Beginningof
POINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESE
PRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION,
MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS OR
ASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTEN
PERMISSION OF POINT OF BEGINNING, INC.
2025 POINT OF BEGINNING, INC.C
REVISIONS
CHECKED:
DRAWN:
DATE
PROJECT NO.
Civil Engineering
Land Surveying
Landscape Arcitecture
SHEET
C0.0
4941 Kirschling Court
Stevens Point, WI 54481
715.344.9999(Ph) 715.344.9922(Fx)
POINT CROSSING LLC
Songbird Land Development
STEVENS POINTPORTAGE, WI
COVER SHEET
JJL
MAJ
09/22/2025
25.0072
CITY OF STEVENS POINT
PORTAGE COUNTY, WISCONSIN
RESIDENTIAL DEVELOPMENT
0 SONGBIRD LANE
PROJECT LOCATION
STEVENS POINT, WISCONSIN
NO SCALE
CIVIL SHEET INDEX:
C1.0 DEMOLITION PLAN
C1.1 DEMOLITION PLAN
C2.0 LAYOUT PLAN
C2.1 LAYOUT PLAN
C3.0 GRADING PLAN
C3.1 GRADING PLAN
C4.0 EROSION CONTROL PLAN
C4.1 EROSION CONTROL PLAN
C5.0 UTILITY PLAN
C5.1 UTILITY PLAN
OWNER INFORMATION
Page 42 of 80
t t t
t t t
N 89°51'29" E
S 19°38'21" E
S 31°10'33" W
S 16°11'14" W
S 65°45'23" E
S 80°00'17" E
N 00°13'34" W
C1
35.79'
218.38'
178.77'
82.15'
55.54'
132.73'
S 43°03'44" W
27.42'
328.89'
ST
ST
STST
SS
SS
SSSS
WM WM
WM
WM
BENCHMARK #2
ELEV=1111.69
DEMOLITION HATCH PATTERNS:
CIVIL SHEET INDEX:
UTILITY DISCLAIMER: BENCHMARK:
C1.0 DEMOLITION PLAN
C1.1 DEMOLITION PLAN
C2.0 LAYOUT PLAN
C2.1 LAYOUT PLAN
C3.0 GRADING PLAN
C3.1 GRADING PLAN
C4.0 EROSION CONTROL PLAN
C4.1 EROSION CONTROL PLAN
C5.0 UTILITY PLAN
C5.1 UTILITY PLAN
BENCHMARK #1
BENCHMARK #2
BENCHMARK #3
Point Beginningof
POINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESE
PRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION,
MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS OR
ASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTEN
PERMISSION OF POINT OF BEGINNING, INC.
2025 POINT OF BEGINNING, INC.C
REVISIONS
CHECKED:
DRAWN:
DATE
PROJECT NO.
Civil Engineering
Land Surveying
Landscape Arcitecture
SHEET
C1.0
4941 Kirschling Court
Stevens Point, WI 54481
715.344.9999 (PH) 715.344.9922 (FX)
POINT CROSSING LLC
Songbird Land Development
STEVENS POINTPORTAGE, WI
DEMOLITION PLAN
JJL
MAJ
09/22/2025
25.0072
0' 30' 60'
1" = 30'
GENERAL NOTES:
KEYNOTES:
MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE
SEE SHEET C1.1
Page 43 of 80
t t t
t t t
S 65°45'23" E
S 80°00'17" E
S 00°23'15" E
S 88°53'02" W
(S 89°05'14" W)
55.54'
132.73'
222.21'
355.34'
531.66'
ST
ST
SS
SS
WM WM
WM
WM
ST
WM
BENCHMARK #1
ELEV=1110.74
BENCHMARK #1
BENCHMARK #2
BENCHMARK #3
Point Beginningof
POINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESE
PRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION,
MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS OR
ASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTEN
PERMISSION OF POINT OF BEGINNING, INC.
2025 POINT OF BEGINNING, INC.C
REVISIONS
CHECKED:
DRAWN:
DATE
PROJECT NO.
Civil Engineering
Land Surveying
Landscape Arcitecture
SHEET
C1.1
4941 Kirschling Court
Stevens Point, WI 54481
715.344.9999 (PH) 715.344.9922 (FX)
POINT CROSSING LLC
Songbird Land Development
STEVENS POINTPORTAGE, WI
DEMOLITION PLAN
JJL
MAJ
09/22/2025
25.0072
0' 30' 60'
1" = 30'
UTILITY DISCLAIMER: BENCHMARK:
MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE
SEE SHEET C1.0
DEMOLITION HATCH PATTERNS:
GENERAL NOTES:
KEYNOTES:
Page 44 of 80
BUILDING 5
HEIGHT 26'-4"
F.F.E. = 1114.00'
25' STREET SETBACK
25' STREET SETBACK
10' SIDE SETBACK
30' REAR SETBACK
BIO-INFILTRATION
BASIN
ELEV = 1110.50'
BUILDING 6
HEIGHT 26'-4"
F.F.E. = 1114.00'
BUILDING 7
HEIGHT 26'-4"
F.F.E. = 1113.00'
BUILDING 4
HEIGHT 26'-4"
F.F.E. = 1113.00'
BUILDING 3
HEIGHT 26'-4"
F.F.E. = 1112.00'
6-STALL
GARAGE
PARKING
F.F.E. = 1111.50'
BIO-INFILTRATION
BASIN
ELEV = 1109.00'
6-STALL
GARAGE
t t t
t t t
N 89°51'29" E
S 19°38'21" E
S 31°10'33" W
S 16°11'14" W
S 65°45'23" E
S 80°00'17" E
N 00°13'34" W
C1
35.79'
218.38'
178.77'
82.15'
55.54'
132.73'
S 43°03'44" W
27.42'
328.89'
ST
ST
STST
SS
SS
SSSS
WM WM
WM
WM
BENCHMARK #2
ELEV=1111.69
PAVEMENT HATCH PATTERNS:
Point Beginningof
POINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESE
PRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION,
MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS OR
ASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTEN
PERMISSION OF POINT OF BEGINNING, INC.
2025 POINT OF BEGINNING, INC.C
REVISIONS
CHECKED:
DRAWN:
DATE
PROJECT NO.
Civil Engineering
Land Surveying
Landscape Arcitecture
SHEET
C2.0
4941 Kirschling Court
Stevens Point, WI 54481
715.344.9999 (PH) 715.344.9922 (FX)
POINT CROSSING LLC
Songbird Land Development
STEVENS POINTPORTAGE, WI
LAYOUT PLAN
JJL
MAJ
09/22/2025
25.0072
GENERAL NOTES:
KEYNOTES:
UTILITY DISCLAIMER: BENCHMARK:
BENCHMARK #1
BENCHMARK #2
BENCHMARK #3
0' 30' 60'
1" = 30'
MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE
SEE SHEET C2.1
Page 45 of 80
25' STREET SETBACK
25' STREET SETBACK
30' REAR SETBACK
10' SIDE SETBACK
6-STALL
GARAGE
PARKING
F.F.E. = 1111.50'
BUILDING 2
HEIGHT 26'-4"
F.F.E. = 1110.50'
BUILDING 1
HEIGHT 26'-4"
F.F.E. = 1112.00'
BUILDING 8
HEIGHT 26'-4"
F.F.E. = 1110.00'
BUILDING 9
HEIGHT 26'-4"
F.F.E. = 1111.50'
BIO-INFILTRATION
BASIN
ELEV = 1107.00'
t t t
t t t
S 65°45'23" E
S 80°00'17" E
S 00°23'15" E
S 88°53'02" W
(S 89°05'14" W)
55.54'
132.73'
222.21'
355.34'
531.66'
ST
ST
SSSS
SS
WM WM
WM
WM
ST
WM
BENCHMARK #1
ELEV=1110.74
UTILITY DISCLAIMER: BENCHMARK:
BENCHMARK #1
BENCHMARK #2
BENCHMARK #3
0' 30' 60'
1" = 30'
PAVEMENT HATCH PATTERNS:
Point Beginningof
POINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESE
PRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION,
MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS OR
ASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTEN
PERMISSION OF POINT OF BEGINNING, INC.
2025 POINT OF BEGINNING, INC.C
REVISIONS
CHECKED:
DRAWN:
DATE
PROJECT NO.
Civil Engineering
Land Surveying
Landscape Arcitecture
SHEET
C2.1
4941 Kirschling Court
Stevens Point, WI 54481
715.344.9999 (PH) 715.344.9922 (FX)
POINT CROSSING LLC
Songbird Land Development
STEVENS POINTPORTAGE, WI
LAYOUT PLAN
JJL
MAJ
09/22/2025
25.0072
GENERAL NOTES:
KEYNOTES:
MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE
SEE SHEET C2.0
Page 46 of 80
BUILDING 5
HEIGHT 26'-4"
F.F.E. = 1114.00'
25' STREET SETBACK
25' STREET SETBACK
10' SIDE SETBACK
30' REAR SETBACK
BIO-INFILTRATION
BASIN
ELEV = 1110.50'
BUILDING 6
HEIGHT 26'-4"
F.F.E. = 1114.00'
BUILDING 7
HEIGHT 26'-4"
F.F.E. = 1113.00'
BUILDING 4
HEIGHT 26'-4"
F.F.E. = 1113.00'
BUILDING 3
HEIGHT 26'-4"
F.F.E. = 1112.00'
6-STALL
GARAGE
PARKING
F.F.E. = 1111.50'
BIO-INFILTRATION
BASIN
ELEV = 1109.00'
6-STALL
GARAGE
t t t
t t t
N 89°51'29" E
S 19°38'21" E
S 31°10'33" W
S 16°11'14" W
S 65°45'23" E
S 80°00'17" E
N 00°13'34" W
C1
35.79'
218.38'
178.77'
82.15'
55.54'
132.73'
S 43°03'44" W
27.42'
328.89'
ST
ST
STST
SS
SS
SSSS
WM WM
WM
WM
BENCHMARK #2
ELEV=1111.69
Point Beginningof
POINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESE
PRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION,
MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS OR
ASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTEN
PERMISSION OF POINT OF BEGINNING, INC.
2025 POINT OF BEGINNING, INC.C
REVISIONS
CHECKED:
DRAWN:
DATE
PROJECT NO.
Civil Engineering
Land Surveying
Landscape Arcitecture
SHEET
C3.0
4941 Kirschling Court
Stevens Point, WI 54481
715.344.9999 (PH) 715.344.9922 (FX)
POINT CROSSING LLC
Songbird Land Development
STEVENS POINTPORTAGE, WI
GRADING PLAN
JJL
MAJ
09/22/2025
25.0072
GENERAL NOTES:
0' 30' 60'
1" = 30'
MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE
SEE SHEET C3.1
UTILITY DISCLAIMER: BENCHMARK:
BENCHMARK #1
BENCHMARK #2
BENCHMARK #3
GRADING LEGEND:
BIO-INFILTRATION BASIN
Page 47 of 80
25' STREET SETBACK
25' STREET SETBACK
30' REAR SETBACK
10' SIDE SETBACK
6-STALL
GARAGE
PARKING
F.F.E. = 1111.50'
BUILDING 2
HEIGHT 26'-4"
F.F.E. = 1110.50'
BUILDING 1
HEIGHT 26'-4"
F.F.E. = 1112.00'
BUILDING 8
HEIGHT 26'-4"
F.F.E. = 1110.00'
BUILDING 9
HEIGHT 26'-4"
F.F.E. = 1111.50'
BIO-INFILTRATION
BASIN
ELEV = 1107.00'
t t t
t t t
S 65°45'23" E
S 80°00'17" E
S 00°23'15" E
S 88°53'02" W
(S 89°05'14" W)
82.15'
55.54'
132.73'
222.21'
355.34'
531.66'
ST
ST
SSSS
SS
WM WM
WM
WM
ST
WM
BENCHMARK #1
ELEV=1110.74
0' 30' 60'
1" = 30'
UTILITY DISCLAIMER: BENCHMARK:
BENCHMARK #1
BENCHMARK #2
BENCHMARK #3
Point Beginningof
POINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESE
PRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION,
MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS OR
ASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTEN
PERMISSION OF POINT OF BEGINNING, INC.
2025 POINT OF BEGINNING, INC.C
REVISIONS
CHECKED:
DRAWN:
DATE
PROJECT NO.
Civil Engineering
Land Surveying
Landscape Arcitecture
SHEET
C3.1
4941 Kirschling Court
Stevens Point, WI 54481
715.344.9999 (PH) 715.344.9922 (FX)
POINT CROSSING LLC
Songbird Land Development
STEVENS POINTPORTAGE, WI
GRADING PLAN
JJL
MAJ
09/22/2025
25.0072
GENERAL NOTES:
GRADING LEGEND:
MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE
SEE SHEET C3.0
INFILTRATION BASIN
Page 48 of 80
BUILDING 5
HEIGHT 26'-4"
F.F.E. = 1114.00'
25' STREET SETBACK
25' STREET SETBACK
10' SIDE SETBACK
30' REAR SETBACK
BIO-INFILTRATION
BASIN
ELEV = 1110.50'
BUILDING 6
HEIGHT 26'-4"
F.F.E. = 1114.00'
BUILDING 7
HEIGHT 26'-4"
F.F.E. = 1113.00'
BUILDING 4
HEIGHT 26'-4"
F.F.E. = 1113.00'
BUILDING 3
HEIGHT 26'-4"
F.F.E. = 1112.00'
6-STALL
GARAGE
PARKING
F.F.E. = 1111.50'
BIO-INFILTRATION
BASIN
ELEV = 1109.00'
6-STALL
GARAGE
t t t
t t t
S 43°03'44" W
27.42'
328.89'
ST
ST
STST
SS
SS
SSSS
WM WM
WM
WM
BENCHMARK #2
ELEV=1111.69
EROSION CONTROL SEQUENCING:
EROSION CONTROL LEGEND:
Point Beginningof
POINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESE
PRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION,
MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS OR
ASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTEN
PERMISSION OF POINT OF BEGINNING, INC.
2025 POINT OF BEGINNING, INC.C
REVISIONS
CHECKED:
DRAWN:
DATE
PROJECT NO.
Civil Engineering
Land Surveying
Landscape Arcitecture
SHEET
C4.0
4941 Kirschling Court
Stevens Point, WI 54481
715.344.9999 (PH) 715.344.9922 (FX)
POINT CROSSING LLC
Songbird Land Development
STEVENS POINTPORTAGE, WI
EROSION CONTROL PLAN
JJL
MAJ
09/22/2025
25.0072
GENERAL NOTES:
UTILITY DISCLAIMER:BENCHMARK:
BENCHMARK #1
BENCHMARK #2
BENCHMARK #3
0' 30' 60'
1" = 30'
0' 30' 60'
1" = 30'
MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE
SEE SHEET C4.1
Page 49 of 80
25' STREET SETBACK
25' STREET SETBACK
30' REAR SETBACK
10' SIDE SETBACK
6-STALL
GARAGE
PARKING
F.F.E. = 1111.50'
BUILDING 2
HEIGHT 26'-4"
F.F.E. = 1110.50'
BUILDING 1
HEIGHT 26'-4"
F.F.E. = 1112.00'
BUILDING 8
HEIGHT 26'-4"
F.F.E. = 1110.00'
BUILDING 9
HEIGHT 26'-4"
F.F.E. = 1111.50'
BIO-INFILTRATION
BASIN
ELEV = 1107.00'
t t t
t t t
S 65°45'23" E
S 80°00'17" E
S 00°23'15" E
S 88°53'02" W
(S 89°05'14" W)
82.15'
55.54'
132.73'
222.21'
355.34'
531.66'
ST
ST
SSSS
SS
WM WM
WM
WM
ST
WM
BENCHMARK #1
ELEV=1110.74
0' 30' 60'
1" = 30'
EROSION CONTROL SEQUENCING:
EROSION CONTROL LEGEND:
Point Beginningof
POINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESE
PRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION,
MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS OR
ASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTEN
PERMISSION OF POINT OF BEGINNING, INC.
2025 POINT OF BEGINNING, INC.C
REVISIONS
CHECKED:
DRAWN:
DATE
PROJECT NO.
Civil Engineering
Land Surveying
Landscape Arcitecture
SHEET
C4.1
4941 Kirschling Court
Stevens Point, WI 54481
715.344.9999 (PH) 715.344.9922 (FX)
POINT CROSSING LLC
Songbird Land Development
STEVENS POINTPORTAGE, WI
EROSION CONTROL PLAN
JJL
MAJ
09/22/2025
25.0072
GENERAL NOTES:
UTILITY DISCLAIMER:BENCHMARK:
BENCHMARK #1
BENCHMARK #2
BENCHMARK #3
0' 30' 60'
1" = 30'
MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE
SEE SHEET C4.0
Page 50 of 80
BUILDING 5
HEIGHT 26'-4"
F.F.E. = 1114.00'
25' STREET SETBACK
25' STREET SETBACK
10' SIDE SETBACK
30' REAR SETBACK
BIO-INFILTRATION
BASIN
ELEV = 1110.50'
BUILDING 6
HEIGHT 26'-4"
F.F.E. = 1114.00'
BUILDING 7
HEIGHT 26'-4"
F.F.E. = 1113.00'
BUILDING 4
HEIGHT 26'-4"
F.F.E. = 1113.00'
BUILDING 3
HEIGHT 26'-4"
F.F.E. = 1112.00'
6-STALL
GARAGE
PARKING
F.F.E. = 1111.50'
BIO-INFILTRATION
BASIN
ELEV = 1109.00'
t t t
t t t
N 89°51'29" E
S 19°38'21" E
S 31°10'33" W
S 16°11'14" W
S 65°45'23" E
N 00°13'34" W
C1
35.79'
218.38'
178.77'
82.15'
55.54'
S 43°03'44" W
27.42'
328.89'
ST
ST
STST
SS
SS
SSSS
WM
ELEV=1112.19
WM
WM
BENCHMARK #2
ELEV=1111.69
UTILITY LEGEND:
Point Beginningof
POINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESE
PRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION,
MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS OR
ASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTEN
PERMISSION OF POINT OF BEGINNING, INC.
2025 POINT OF BEGINNING, INC.C
REVISIONS
CHECKED:
DRAWN:
DATE
PROJECT NO.
Civil Engineering
Land Surveying
Landscape Arcitecture
SHEET
C5.0
4941 Kirschling Court
Stevens Point, WI 54481
715.344.9999 (PH) 715.344.9922 (FX)
POINT CROSSING LLC
Songbird Land Development
STEVENS POINTPORTAGE, WI
UTILITY PLAN
JJL
MAJ
09/22/2025
25.0072
GENERAL NOTES:
UTILITY DISCLAIMER:BENCHMARK:
BENCHMARK #1
BENCHMARK #2
BENCHMARK #3
0' 30' 60'
1" = 30'
MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE
SEE SHEET C5.1
Page 51 of 80
25' STREET SETBACK
25' STREET SETBACK
30' REAR SETBACK
10' SIDE SETBACK
6-STALL
GARAGE
PARKING
F.F.E. = 1111.50'
BUILDING 2
HEIGHT 26'-4"
F.F.E. = 1110.50'
BUILDING 1
HEIGHT 26'-4"
F.F.E. = 1112.00'
BUILDING 8
HEIGHT 26'-4"
F.F.E. = 1110.00'
BUILDING 9
HEIGHT 26'-4"
F.F.E. = 1111.50'
BIO-INFILTRATION
BASIN
ELEV = 1107.00'
t t t
t t t
S 65°45'23" E
S 80°00'17" E
S 00°23'15" E
S 88°53'02" W
(S 89°05'14" W)
82.15'
55.54'
132.73'
222.21'
355.34'
531.66'
ST
ST
SSSS
SS
WM WM
WM
WM
ST
WM
BENCHMARK #1
ELEV=1110.74
UTILITY DISCLAIMER:BENCHMARK:
BENCHMARK #1
BENCHMARK #2
BENCHMARK #3
UTILITY LEGEND:
Point Beginningof
POINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESE
PRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION,
MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS OR
ASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTEN
PERMISSION OF POINT OF BEGINNING, INC.
2025 POINT OF BEGINNING, INC.C
REVISIONS
CHECKED:
DRAWN:
DATE
PROJECT NO.
Civil Engineering
Land Surveying
Landscape Arcitecture
SHEET
C5.1
4941 Kirschling Court
Stevens Point, WI 54481
715.344.9999 (PH) 715.344.9922 (FX)
POINT CROSSING LLC
Songbird Land Development
STEVENS POINTPORTAGE, WI
UTILITY PLAN
JJL
MAJ
09/22/2025
25.0072
GENERAL NOTES:
0' 30' 60'
1" = 30'
MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE
SEE SHEET C5.0
Page 52 of 80
BUILDING 5
HEIGHT 26'-4"
F.F.E. = 1114.00'
25' STREET SETBACK
25' STREET SETBACK
10' SIDE SETBACK
30' REAR SETBACK
BIO-INFILTRATION
BASIN
ELEV = 1110.50'
BUILDING 6
HEIGHT 26'-4"
F.F.E. = 1114.00'
BUILDING 7
HEIGHT 26'-4"
F.F.E. = 1113.00'
BUILDING 4
HEIGHT 26'-4"
F.F.E. = 1113.00'
BUILDING 3
HEIGHT 26'-4"
F.F.E. = 1112.00'
6-STALL
GARAGE
PARKING
F.F.E. = 1111.50'
BIO-INFILTRATION
BASIN
ELEV = 1109.00'
t t t
t t t
N 89°51'29" E
S 19°38'21" E
S 31°10'33" W
S 16°11'14" W
S 65°45'23" E
N 00°13'34" W
C1
35.79'
218.38'
178.77'
82.15'
S 43°03'44" W
27.42'
328.89'
ST
ST
STST
SS
SS
SSSS
WM
BENCHMARK #3
ELEV=1112.19
WM
WM
BENCHMARK #2
ELEV=1111.69
Point Beginningof
POINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESE
PRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION,
MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS OR
ASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTEN
PERMISSION OF POINT OF BEGINNING, INC.
2025 POINT OF BEGINNING, INC.C
REVISIONS
CHECKED:
DRAWN:
DATE
PROJECT NO.
Civil Engineering
Land Surveying
Landscape Arcitecture
SHEET
L1.0
4941 Kirschling Court
Stevens Point, WI 54481
715.344.9999 (PH) 715.344.9922 (FX)
POINT CROSSING LLC
Songbird Land Development
STEVENS POINTPORTAGE, WI
LANDSCAPE PLAN
JJL
MAJ
09/22/2025
25.0072
UTILITY DISCLAIMER:BENCHMARK:
BENCHMARK #1
BENCHMARK #2
BENCHMARK #3
0' 30' 60'
1" = 30'
MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE
SEE SHEET L1.1
GENERAL NOTES:
PLANTING SCHEDULE:
LEGEND:
Page 53 of 80
25' STREET SETBACK
25' STREET SETBACK
30' REAR SETBACK
10' SIDE SETBACK
6-STALL
GARAGE
PARKING
F.F.E. = 1111.50'
BUILDING 2
HEIGHT 26'-4"
F.F.E. = 1110.50'
BUILDING 1
HEIGHT 26'-4"
F.F.E. = 1112.00'
BUILDING 8
HEIGHT 26'-4"
F.F.E. = 1110.00'
BUILDING 9
HEIGHT 26'-4"
F.F.E. = 1111.50'
BIO-INFILTRATION
BASIN
ELEV = 1107.00'
t t t
t t t
S 65°45'23" E
S 80°00'17" E
S 00°23'15" E
S 88°53'02" W
(S 89°05'14" W)
82.15'
55.54'
132.73'
222.21'
355.34'
531.66'
ST
ST
SSSS
SS
WM WM
WM
WM
ST
WM
BENCHMARK #1
ELEV=1110.74
Point Beginningof
POINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESE
PRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION,
MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS OR
ASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTEN
PERMISSION OF POINT OF BEGINNING, INC.
2025 POINT OF BEGINNING, INC.C
REVISIONS
CHECKED:
DRAWN:
DATE
PROJECT NO.
Civil Engineering
Land Surveying
Landscape Arcitecture
SHEET
L1.1
4941 Kirschling Court
Stevens Point, WI 54481
715.344.9999 (PH) 715.344.9922 (FX)
POINT CROSSING LLC
Songbird Land Development
STEVENS POINTPORTAGE, WI
LANDSCAPE PLAN
JJL
MAJ
09/22/2025
25.0072
UTILITY DISCLAIMER:BENCHMARK:
BENCHMARK #1
BENCHMARK #2
BENCHMARK #3
0' 30' 60'
1" = 30'
MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE MATCH LINE
SEE SHEET L1.0
GENERAL NOTES:
PLANTING SCHEDULE:
LEGEND:
Page 54 of 80
Page 55 of 80
Page 56 of 80
Page 57 of 80
Page 58 of 80
Page 59 of 80
Page 60 of 80
Page 61 of 80
Page 62 of 80
Page 5 of 149
23.01 GENERAL PROVISIONS:
The following general provisions shall apply in the interpretation and enforcement of this
ordinance:
1) Title.
This ordinance shall be known and may be cited and referred to as the "Zoning
Ordinance" of the City of Stevens Point, Wisconsin.
2) Compliance.
The use or development of any land or water, a change or alteration in the use of and land
or water, and the use, change of use, alteration, construction, reconstruction, remodeling
or expansion of any structure within the areas to be regulated by this ordinance shall be in
compliance with the terms of this ordinance, and other applicable local, state, and federal
regulations.
3) Conflicting Provisions Repealed.
The Zoning Ordinance and all amendments thereto, the mobile home ordinance, airport
height limitation ordinance and all ordinances or parts or sections of ordinances in
conflict herewith, of the City of Stevens Point, WI. are hereby repealed in their entirety
except provisions regulating signs and the following ordinance is enacted in lieu thereof.
4) Purpose and Intent.
The purpose of this ordinance is to promote the health, safety, morals, prosperity,
aesthetics and general welfare of this community. It is the general intent of this
ordinance to regulate and restrict the use of all structures, lands and waters; regulate and
restrict lot coverage, population distribution and density, and the size and location of all
structures so as to: lessen congestion in and promote the safety and efficiency of the
streets and highways; secure safety from fire, flooding, panic and other dangers; provide
adequate light, air, sanitation and drainage; percent over-crowding; avoid undue
population concentration; facilitate the adequate provision of public facilities and
utilities; stabilize and protect property values; further the appropriate use of land and
conservation of natural resources; preserve and promote the beauty of the community;
and implement the community's comprehensive plan or plan components. It is further
intended to provide for the administration and enforcement of this ordinance and to
provide penalties for its violation.
5) Authority.
These regulations are adopted pursuant to the authorization contained in Sections 62.23,
87.30, ll4.l26 and l45.02 of the Wisconsin Statutes as amended and said Section of
Wisconsin Statutes is hereby adopted.
6) Interpretation, Greater Restrictions and Abrogation.
General Provisions - Existing
Page 63 of 80
Page 6 of 149
Where a city ordinance other than this chapter is more restrictive than the provisions
contained in this ordinance, that ordinance shall continue in full force and effect to the
extent of the greater restrictions, but not otherwise. This ordinance is not intended to
repeal, abrogate, or impair any existing easements, covenants, or private deed restrictions.
However, where this ordinance imposes greater restrictions, the provisions of this
ordinance shall prevail.
7) Warning and Disclaimer of Liability.
The degree of protection intended to be provided by this chapter is considered reasonable
for regulatory purposes and is based on engineering and scientific methods of study. This
ordinance does not imply that compliance will result in freedom from damages nor shall
this ordinance create a liability on the part of or a cause of acting against the City of
Stevens Point or any officer or employee for any damage that may result from reliance on
this ordinance.
8) Effective Date.
This ordinance is effective after public hearing, adopted by the Common Council on
February 14, 1979, and publication on February 23, 1979.
9) Severability.
Should any section or provision of this ordinance be declared by a court of competent
jurisdiction to be invalid, that decision shall not affect the validity of the ordinance as a
whole or any part thereof, other than the part so declared to be invalid.
10) Exceptions and Modifications.
The regulations specified in this ordinance shall be subject to the following exceptions
and interpretations:
Structures permitted above height limit. The building height limitations of this ordinance shall
be modified as follows:
1) Chimneys, cooling towers, elevator bulkheads, fire towers, monuments,
penthouses, stacks, stage towers or scenery lofts, tanks, water towers, silos,
spires and radio or television towers, or necessary mechanical appurtenances
may be erected to a height in accordance with existing or here-after adopted
ordinances of the City of Stevens Point, Wisconsin.
2) Public, semi-public or public service building, hospitals, sanitariums or
schools, when permitted in a district, may be erected to a height not exceeding
sixty (60) feet, and churches and temples, or structures at an airport, when
permitted in a district may be erected to a height not exceeding seventy-five
(75) feet if the building is set back from each property line at least two (2) feet
for each foot of additional building height above the height limit otherwise
provided in the district in which the building is built.
Page 64 of 80
23.01 GENERAL PROVISIONS:
The following general provisions shall apply in the interpretation and enforcement of this
Oordinance:
1) Title.
This Oordinance, effective as of XXXXXX X, 20XX, shall be known and may be cited and
referred to as the "Zoning Ordinance" of the City of Stevens Point, Wisconsin. This title may
also be known and referred to as “this Chapter” or “this Ordinance.”
2) Zoning Map.
The Stevens Point Zoning Map is hereby incorporated into and made a part of this
Ordinance. The Zoning Administrator shall administer the Zoning Map in accordance with
Section 23.XX.
3) Authority & Applicability.
a) This Ordinance is created pursuant to the authority granted under ss. 62.23(7),
62.231, 87.30, 236.45, and 281.31, Wis. Stats.
b) Where this Ordinance refers to or cites a section of Wisconsin Statutes and federal
law, and such section is later amended or superseded, then this Ordinance shall
refer to the amended section or the section that most nearly corresponds to the
superseded section.
c) All lands within the City’s corporate boundary and its extraterritorial jurisdiction, as
identified on the Zoning Map, are subject to this Ordinance.
a) When allowed by the State of Wisconsin, this Ordinance shall apply to any building,
structure, lot, land use, development, or subdivision by City, county, state, or federal
agencies on land subject to this Ordinance.
d)
4) Severability.
Should any section or provision of this Ordinance be declared by a court of competent
jurisdiction to be invalid, that decision shall not affect the validity of the Ordinance as a
whole or any part thereof, other than the part so declared to be invalid.
2) Compliance.
The use or development of any land or water, a change or alteration in the use of and land
or water, and the use, change of use, alteration, construction, reconstruction, remodeling
or expansion of any structure within the areas to be regulated by this ordinance shall be in
compliance with the terms of this ordinance, and other applicable local, state, and federal
Commented [AK1]: Finalized at a later date.
Commented [AK2]: City zoning statute.
Commented [AK3]: City zoning of wetlands in
shorelands.
Commented [AK4]: Floodplain zoning.
Commented [AK5]: Subdivision regulations.
NOTE: To be included if the City’s Subdivision Ordinance
is consolidated in the Zoning Ordinance.
Commented [AK6]: Navigable waters protection law.
Commented [AK7]: NOTE: To be included if the City’s
Subdivision Ordinance is consolidated in the Zoning
Ordinance.
Page 65 of 80
regulations.
3) Conflicting Provisions Repealed.
The Zoning Ordinance and all amendments thereto, the mobile home ordinance, airport
height limitation ordinance and all ordinances or parts or sections of ordinances in
conflict herewith, of the City of Stevens Point, WI. are hereby repealed in their entirety
except provisions regulating signs and the following ordinance is enacted in lieu thereof.
4) Purpose and Intent.
5) The purpose of this ordinance is to promote the health, safety, morals, prosperity,
aesthetics and general welfare of this community. It is the general intent of this
ordinance to regulate and restrict the use of all structures, lands and waters;
regulate and
restrict lot coverage, population distribution and density, and the size and location
of all
structures so as to: lessen congestion in and promote the safety and efficiency of
the
streets and highways; secure safety from fire, flooding, panic and other dangers;
provide
adequate light, air, sanitation and drainage; percent over-crowding; avoid undue
population concentration; facilitate the adequate provision of public facilities and
utilities; stabilize and protect property values; further the appropriate use of land
and
conservation of natural resources; preserve and promote the beauty of the
community;
and implement the community's comprehensive plan or plan components. It is
further
intended to provide for the administration and enforcement of this ordinance and to
provide penalties for its violation.
5)
The purpose of this Ordinance is to:
1. Protect the health, safety, and general welfare of the public;
2. Implement goals and policies of the City’s Comprehensive Plan;
3. Regulate the location, construction, reconstruction, alteration, and use of buildings,
structures, and land;
4. Provide adequate light and air; prevent the overcrowding of land; secure safety from
fire, panic, and other dangers;
5. Control and lessen congestion in the streets;
Commented [AK8]: Consolidated under 23.01(3).
Page 66 of 80
6. Promote an efficient and economic use of land;
7. Facilitate adequate provisions for transportation, water, sewerage, schools, parks,
and other public facilities; and
6. Ensure orderly development that is complementary and harmonious to the
surrounding area.
Authority.
These regulations are adopted pursuant to the authorization contained in Sections 62.23,
87.30, ll4.l26 and l45.02 of the Wisconsin Statutes as amended and said Section of
Wisconsin Statutes is hereby adopted.
7)6) Interpretation, Greater Restrictions and Abrogation.
Where a city ordinance other than this chapter Ordinance is more restrictive than the
provisions contained in this Oordinance, that ordinance shall continue in full force and
effect to the extent of the greater restrictions, but not otherwise. This Oordinance is not
intended to repeal, abrogate, or impair any existing easements, covenants, or private deed
restrictions. However, where this Oordinance imposes greater restrictions, the provisions of
thisO ordinance shall prevail.
7) Word Usage
The interpretation of this Ordinance shall abide by the provisions and rules of this Section,
except where the context clearly requires otherwise, or where the result would clearly be
inconsistent with the apparent intent of this Ordinance.
a) The word “City” shall mean the City of Stevens Point, Wisconsin.
b) The word “County” shall mean the County of Portage, Wisconsin.
c) The word “State” shall mean the State of Wisconsin.
d) The words “Plan Commission” shall mean the City of Stevens Point Plan
Commission.
e) The words “Zoning Board of Appeals” and “Board of Appeals” shall refer to the City
of Stevens Point Zoning Board of Appeals.
f) The word “Council” shall refer to the City of Stevens Point Common Council.
g) The words “shall,” “will,” and “must” are mandatory.
h) The words “may,” “might,” and “can” are permissive.
i) The masculine gender shall include the feminine, and vice versa.
j) Words that are used or defined in one tense or form shall include other tenses and
derivative forms.
8) Abbreviations
The following abbreviations in this Ordinance are intended to have the following meanings:
Abbreviation Meaning
Commented [AK9]: Reviewed during October 21, 2025
Plan Commission meeting.
Commented [AK10]: Consolidated under 23.01(3).
Page 67 of 80
ft Foot
Sq ft Square Feet
Wis. Stats. Wisconsin Statutes
P Permitted Land Use
C Conditional Land Use
8) Warning and Disclaimer of Liability.
The degree of protection intended to be provided by this chapter is considered reasonable
for regulatory purposes and is based on engineering and scientific methods of study. This
ordinance does not imply that compliance will result in freedom from damages nor shall
this ordinance create a liability on the part of or a cause of acting against the City of
Stevens Point or any officer or employee for any damage that may result from reliance on
this ordinance.
9) Effective Date.
This ordinance is effective after public hearing, adopted by the Common Council on
February 14, 1979, and publication on February 23, 1979.
10) Severability.
Should any section or provision of this ordinance be declared by a court of competent
jurisdiction to be invalid, that decision shall not affect the validity of the ordinance as a
whole or any part thereof, other than the part so declared to be invalid.
Commented [AK11]: Consolidated with 23.01(1).
Commented [AK12]: Relocated above.
Page 68 of 80
3336073 Easement
THIS INDENTURE is made this ______ day of ______________,
______, by and between City of Stevens Point, ("Grantor") and
WISCONSIN PUBLIC SERVICE CORPORATION, a Wisconsin
Corporation, along with its successors and assigns (collectively,
"Grantee") for good and valuable consideration, the receipt and
sufficiency of which are hereby acknowledged, Grantor, owner of
land, hereby grants and warrants to, Grantee, a permanent easement
upon, within, beneath, over and across a part of Grantor’s land
hereinafter referred to as "easement area" more particularly described
as follows:
Part of Lots 1 and 2, and Outlot 2 of Certified Survey Map
No. 11827, Recorded in the Portage County Register of
Deeds as Document 900985; and part of Blocks 9, 10, & 24
of the recorded Plat of Strong, Ellis, and Others Addition,
all being part of Government Lot 2 of Section 32,
Township 24 North, Range 8 East, City of Stevens Point,
County of Portage, State of Wisconsin, as shown on the
attached Exhibit “A”.
Return to:
Wisconsin Public Service Corp.
Real Estate Dept.
P.O. Box 19001
Green Bay, WI 54307-9001
Tax Parcel Identification Number
(PIN)
281-24-0832201308
281-24-0832201937
281-24-0832201938
281-24-0832201939
1. Purpose: ELECTRIC UNDERGROUND AND GAS - The purpose of this easement is to construct,
install, operate, maintain repair, replace and extend underground utility facilities, conduit and cables,
electric pad-mounted transformers, manhole, electric pad-mounted vacuum fault interrupter, concrete slabs,
power pedestals, riser equipment, terminals and markers, together with all necessary and appurtenant
equipment under and above ground, as well as pipeline or pipelines with valves, tieovers, main laterals and
service laterals, together with all necessary and appurtenant equipment under and above ground, including
cathodic protection apparatus used for corrosion control, as deemed necessary by Grantee, for the
transmission and distribution of electric energy, signals, television and telecommunications services; natural
gas and all by-products thereof, or any liquids, gases, or substances which can or may be transported or
distributed through a pipeline, including the customary growth and replacement thereof. Trees, bushes,
branches and roots may be trimmed or removed so as not to interfere with Grantee's use of the easement
area.
2. Access: Grantee shall have the right to enter on and across any of the Grantor’s property outside of the
easement area as may be reasonably necessary to gain access to the easement area and as may be reasonably
necessary for the construction, installation, operation, maintenance, inspection, removal or replacement of the
Grantee’s facilities.
3. Buildings or Other Structures: Grantor agrees that no structures will be erected in the easement area or in
such close proximity to Grantee's facilities as to create a violation of all applicable State of Wisconsin electric
and gas codes or any amendments thereto.
Page 69 of 80
4. Elevation: Grantor agrees that the elevation of the ground surface existing as of the date of the initial
installation of Grantee's facilities within the easement area will not be altered by more than 4 inches without
the written consent of Grantee.
5. Restoration: Grantee agrees to restore or cause to have restored Grantor's land, as nearly as is reasonably
possible, to the condition existing prior to such entry by Grantee or its agents. This restoration, however, does
not apply to any trees, bushes, branches or roots which may interfere with Grantee's use of the easement area.
6. Exercise of Rights: It is agreed that the complete exercise of the rights herein conveyed may be gradual and
not fully exercised until sometime in the future, and that none of the rights herein granted shall be lost by non-
use.
7. Binding on Future Parties: This grant of easement shall be binding upon and inure to the benefit of the
heirs, successors and assigns of all parties hereto.
8. Easement Review: Grantor acknowledges receipt of materials which describe Grantor’s rights and options
in the easement negotiation process and furthermore acknowledges that Grantor has had at least 5 days to
review this easement document or voluntarily waives the five day review period.
[REMAINDER OF PAGE LEFT BLANK]
Page 70 of 80
WITNESS the hand and seal of the Grantor the day and year first above written
City of Stevens Point
Organization name
Sign Name
Print name & title
Sign Name
Print name & title
STATE
OF
)
)SS
COUNTY
OF
)
This instrument was acknowledged before me this _______ day of ___________________, _______, by the
above-named_________________________________________________________ City of Stevens Point, to
me known to be the Grantor(s) who executed the foregoing instrument on behalf of said Grantor(s) and
acknowledged the same
Sign Name
Print Name
Notary Public, State of
My Commission expires:
This instrument drafted by: Philip Paradies
Wisconsin Public Service Corporation
REMS Entity ID WR Number Document ID REMS Formatted Number
1488432 WMIS-3362776 3336073 INT11-488-432
Page 71 of 80
**Temporary Exhibit **
**Final Exhibit will be sent for approval at a later date**
Page 72 of 80
¬«
66
Water Street
Main Street
A
r
l i n
g
t o
n
P
l a
c
e
Second Street
Clark Street
Third Street
W
e
s t
C
l a
r k
S t r e e t
0 100 200
Feet
´
Parcel of Interest
Prepared by Portage County Planning and Zoning: August 20, 2025 RPS
This map shows the approximate relative location of property boundaries but was
not prepared by a professional land surveyor. This map is provided for
informational purposes only and may not be sufficient or appropriate for legal,
engineering, or surveying purposes.
Date of Photography: Spring, 2020
Parcel Boundaries
Page 73 of 80
City of Stevens Point
1515 Strongs Avenue
Stevens Point, WI 54481-3594
Department of Community Development
Redevelopment Authority
Jarod Kivela, Director
Ph: (715) 346-1567
Fax: (715) 346-1498
www.stevenspoint.com
Open Records Information: The City of Stevens Point is subject to Wisconsin Statutes relating to public records.
Communication, such as this document, sent or received by City employees are subject to these laws. Unless otherwise
exempted from the public records law, senders and receivers of City communication should presume that the
communications are subject to release upon request, and to state record retention requirements.
Page 1 of 1
MEMORANDUM
To: City of Stevens Point Plan Commission and Common Council
From: Jarod Kivela, Director of Community Development
Date: October 29, 2025
RE: Forest Creek Subdivision – Request to Combine Lots
A request has been submitted regarding two remaining small lots within the Forest Creek
Subdivision. The developer, who previously purchased and constructed single-family slab-on-grade
homes on two of the four small lots in this block, is seeking to purchase the remaining two lots (each
approximately 5,040 square feet) and combine them into a single parcel totaling 10,080 square
feet.
After evaluating the site, the developer has indicated that building on the final corner lot as a
standalone single-family home would be challenging given its configuration and grading. The
developer does not specialize in zero-lot-line or duplex construction and would prefer to combine
the lots to construct one additional single-family home consistent with their prior development in
the subdivision.
Staff has reviewed the request with City building inspectors and evaluated it against applicable
zoning standards. While construction of two single-family homes would not be impossible, it is not
considered ideal based on site conditions and lot layout.
Staff is therefore bringing this request forward to the Plan Commission and Common Council for
direction. The options available include:
1. Approving the combination and sale of the two lots to the developer for construction of a
single-family home; or
2. Maintaining the lots as separate parcels for potential development as a duplex, zero-lot-line
homes, or two smaller single-family homes by a future builder.
Staff seeks input from the Plan Commission and Council regarding the preferred course of action.
Page 74 of 80
Page 75 of 80
Page 76 of 80
City of Stevens Point
1515 Strongs Avenue
Stevens Point, WI 54481-3594
Department of Community Development
& Redevelopment Authority
Jarod Kivela, Director
Ph: (715) 346-1567
Fax: (715) 346-1498
www.stevenspoint.com
Open Records Information: The City of Stevens Point is subject to Wisconsin Statutes relating to public records.
Communication, such as this document, sent or received by City employees are subject to these laws. Unless otherwise
exempted from the public records law, senders and receivers of City communication should presume that the
communications are subject to release upon request, and to state record retention requirements.
Page 1 of 4
DIRECTORS REPORT
To: City Plan Commission
From: Jarod Kivela, Director of Community Development
Date: October 30, 2025
RE: Directors Report
----------------------
Development Updates
• Portage County Business Park BID/Downtown BID: Karen Margelofsky has started as the BID
Executive Director. We are excited to have her on board!
Karen has already jumped into the deep end and has started to complete the revisions to both
Operation Plans and budgets. She is of course learning all of the elements to each BID and the city
as a whole (future projects, grant programs, etc.). Staff looks forward to working alongside Karen to
ensure she has the support needed as she continues to learn the ropes.
• Forest Creek Subdivision: A total of 25 lots have had movement in the new subdivision. 21 of the
lots have officially closed and 4 are pending.
Although a rocky process for each, all of the mailboxes have been installed, and TDS has installed
Fiber throughout the subdivision. Both systems are operational.
Page 77 of 80
stevenspoint.com
• TID 14: Staff continues to explore leads for new business for this area as well as respond to RFI’s that
come in through the WEDC. City Staff continues to evaluate and advocate for ways to make this
area more attractive and set it up for success. The City’s new industrial park site in TID 14 (Badger
Ave area) is continuing to be overlooked by businesses, as it does not have high-pressure gas
Address Lot Number Sale Date Purchase Price
0 FOREST CREEK RD STEVENS POINT
WI 54482
15 5/6/2025 $65,000.00
5534 FOREST CREEK RD STEVENS
POINT WI 54482 17 6/27/2025 $55,000.00
5542 FOREST CREEK RD STEVENS
POINT WI 54482 18 7/3/2025 $55,000.00
0 FOREST CREEK RD STEVENS POINT
WI 54482 21 Pending $55,000.00
5580 FOREST CREEK RD STEVENS
POINT WI 54482 22 10/15/2025 $55,000.00
0 FOREST CREEK RD STEVENS POINT
WI 54482 23 Pending $55,000.00
5581 FOREST CREEK RD STEVENS
POINT WI 54482 27 4/9/2025 $22,000.00
5573 FOREST CREEK RD STEVENS
POINT WI 54482 28 4/9/2025 $22,000.00
0 FOREST CREEK RD STEVENS POINT
WI 54482 29 Offer $34,000.00
0 LEONARD ST STEVENS POINT WI
54482 30 Offer
5572 GOLLA RD, STEVENS POINT, WI
54482 34 4/9/2025 $45,000.00
5566 GOLLA RD, STEVENS POINT, WI
54482 35 4/9/2025 $45,000.00
220 LEONARD ST STEVENS POINT WI
54482 37 5/23/2025 $50,000.00
212 LEONARD ST, STEVENS POINT, WI
54482 38 4/9/2025 $50,000.00
0 FOREST CREEK RD STEVENS POINT
WI 54482 39 10/10/2025 $50,000.00
0 FOREST CREEK RD STEVENS POINT
WI 54482 40 9/11/2025 $50,000.00
211 JOE ST, STEVENS POINT, WI 54482 41 4/9/2025 $50,000.00
219 JOE ST STEVENS POINT WI 54482 42 5/23/2025 $50,000.00
0 FOREST CREEK RD STEVENS POINT
WI 54482 49 9/11/2025 $25,000.00
0 FOREST CREEK RD STEVENS POINT
WI 54482 50 9/11/2025 $25,000.00
0 FOREST CREEK RD STEVENS POINT
WI 54482 51 9/11/2025 $25,000.00
0 FOREST CREEK RD STEVENS POINT
WI 54482 52 9/11/2025 $25,000.00
0 FOREST CREEK RD STEVENS POINT
WI 54482 53 9/11/2025 $25,000.00
0 FOREST CREEK RD STEVENS POINT
WI 54482 54 9/11/2025 $25,000.00
5469 FOREST CREEK RD STEVENS
POINT WI 54482 55 4/9/2025 $25,000.00
Page 78 of 80
stevenspoint.com
available for use or rail access. Many businesses looking to locate in an area like this want to have
the systems already installed or have a guaranteed installation date.
Through a partnership with Burlington Junction Railway, an effort is being made to source local and
regional businesses that could benefit from rail in the park. We are at the beginning stages of
having those discussions. With pairing potential local interest and continuing to source new
businesses to the park, staff is confident that a pathway can be found to get the rail installed and
show a positive financial justification for doing so.
• Shopko Site: The developer that has been engaged with the city for the better part of this year has
unfortunately missed the WHEDA deadline for tax credits and had to return them. With that being
the case, the project was essentially dead for this year. Interest was provided by the developer to
submit for next year recently, but Staff has already been working through the process with a
developer on another portion of the site. Staff notified the past developer that we would love to
work with them through next year if they would like to resubmit their proposal.
After completing presentations to the RDA, the RDA directed staff to work with Commonwealth
Development on an approx. 47 unit affordable housing project on the southeast quarter of the
Shopko site. The RDA asked the developer to rework the plan a bit to include more parking and an
expanded community servicing facility so that a full daycare could be accommodated in the
space. The developer is working on this but has approached the City about a possible increase in
the TIF ask to accommodate the expanded facility. More discussions to come. An RDA meeting is
being scheduled for mid November.
• City Hall: The City Council made a decision to build a new on the 1039 Ellis Street site. Staff have
now started the initial design process for the new build with Somerville Architects. While the design
work progresses, Staff will work on any additional items needed to prepare for the work (Phase 2
ESA coordination, demolition coordination, survey work, finalizing the transfer with the county, etc.).
Although there is a lot of work ahead of us, it is great to see progress.
It is hoped to have a more formal layout and design presented in the near future. A design
committee will also be formed so that recommendations can be made on the overall aesthetics of
the new building.
• The Oaks on Maria Drive: Work continues! The building is being buttoned up, and interior work
continues.
• 1466 Water Street/Edgewater Manor Site: Pelton Builders recently notified the City that they would
like to rescind the LOI and withdraw their interest on the site. The contamination aspect of the site
was outside of their typical development desires and they are now working with the City on a
potential new site for a multi-family project. An RFP has been rereleased for this property.
A few different proposals have been submitted for this property. Staff continues to work through
the process with potential developers, current tenants, environmental consultants, state
representatives, adjacent land owners and infrastructure companies to keep this project site
moving. With these old sites, there is never a clear and easy process. There are always many
moving parts that demand quite a bit of staff time. Staff hopes to continue working through the
process and bring forward any RFP responses in Q1 of 2026.
• Comprehensive Plan: Staff have contracted with the North Central Wisconsin Regional Planning
Commission to assist with this effort. The first sections are to be reviewed in the coming weeks by
staff, the RPC, and the Planning Commission. This document rewrite is another heavy lift in addition
to the zoning code rewrite. Staff is working to juggle both organization of redevelopment sites and
Page 79 of 80
stevenspoint.com
this rewrite. Although a tough situation and heavy demand, staff is navigating quite well. We ask
for your patience with us as we continue to work through each of these priorities.
General Department
• Anna Sager from UWSP has been doing a fantastic job assisting with the zoning code rewrite. We
have offered her the opportunity to stay with us through the spring year, to which she accepted!
We are excited to have her on board for a longer period of time to not only assist us through a
heavy project, but also allow her to learn as much as she can through our knowledgeable staff.
• Although an absence in multiple positions resulted in the department falling a bit behind, all new
staff are quickly learning the ropes and working to dig out of that backlog. Loren and Rebecca are
both doing well in their positions and will increase their efficiency as time continues. Although
anything can happen, the department looks forward to having a full strength staff in 2026 so that
the workload can be properly evaluated. There is room for efficiency yet and a need for minor
staffing changes, but more insight will be gained through 2026.
• Ximena Christianson has submitted her retirement notice for January 5, 2026. The department has
been approved for a brief overlap period for training purposes and has thus started the hiring
process for that position. Through the process, Cody Hoffman (current electrical inspector) has
been offered the positions and has accepted. We are excited to see him excel in his field and look
for advancement. With that position now open, we will be looking to post and fill that prior to the
end of November.
• Although not department specific, the current CVB Director has resigned and left the organization.
Ample notice was provided and a search for a new Director started right away. The interview
process continues and it is anticipated that a new Director will be brought on in December of 2025
or right away in the new year.
Page 80 of 80