RecordWell Data

Special Common Council — Agenda Packet

City of Stevens Point · Portage County · Common Council · meeting of Oct 27, 2025 · Agenda packets

Open the original document More from City of Stevens Point

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Our intention is to have in-person meetings going forward. For the time being, we will hold the City Committee Meetings, Plan Commission, Council and most others at the Community Room at 933 Michigan Avenue. This in-person location will meet the legal requirement for our open meetings. We will have a virtual option available, but the technology for the hybrid style meeting may not be reliable all of the time. CITY OF STEVENS POINT SPECIAL COUNCIL MEETING Community Room 933 Michigan Avenue, Stevens Point, WI OR Zoom Teleconferencing Meeting ID: 816 0287 4308 | Passcode: 829323 By Computer: Zoom Link By Phone: +1-312-626-6799 (US Chicago) October 27, 2025 6:00 PM AGENDA 1. Roll Call. Consideration and Possible Action on the Following: 2. Approval of an access agreement with Wisconsin Public Service Corporation to allow ongoing monitoring and supplemental site investigation of the southern portion of Pfiffner Pioneer Park. 3. Adjournment. RMC – Revised Municipal Code Persons who wish to address the Common Council may make a statement as long as it pertains to a specific agenda item. Persons who wish to speak on an agenda item will be limited to a five (5) minute presentation. Any person who wishes to address the Common Council on a matter which is not on the agenda will be given a maximum of three (3) minutes and the time strictly enforced under the item, “Persons who wish to address the mayor and council on non-agenda items.” Individuals should not expect to engage in discussion with members of the City Council and City staff. Any person who has special needs while attending this meeting or needing agenda materials for this meeting should contact the City Clerk as soon as possible to ensure a reasonable accommodation can be made. The City Clerk can be reached by telephone at (715) 346-1569 or by mail at 1515 Strongs Avenue, Stevens Point, WI 54481. Copies of ordinances, resolutions, reports and minutes of the committee meetings are on file at the office of the City Clerk for inspection during the regular business hours from 7:30 A.M. to 4:00 P.M. Page 1 of 35 TO: Common Council FROM: Andrew Beveridge – City Attorney DATE: 10-23-25 RE: WPS Access Agreement – Pfiffner Park Alderpersons: In connection with the ongoing process of addressing contamination connected to the former WPS site adjacent to Pfiffner Park, WPS has been directed by US EPA to do additional soil borings and install additional monitoring wells within the park. The attached agreement provides authorization and conditions for them to perform that work. The access agreement requires Common Council approval and is time sensitive, which is why we are asking you to act upon it at this Special Common Council Meeting. Thank you, Andrew Beveridge City Attorney Page 2 of 35 1 ACCESS AGREEMENT . This Access Agreement ("Agreement") is made this ______day of __________2025, by and between Wisconsin Public Service Corporation ("WPSC") and the City of Stevens Point, Wisconsin ("City") (collectively, the "Parties"). RECITALS WHEREAS, WPSC is responsible for ongoing monitoring and supplemental site investigation of a former manufactured gas plant site located in the southern portion of Pfiffner Pioneer Park along Crosby Avenue in Stevens Point, Wisconsin (the "Site"); WHEREAS, WPSC, its consultant, Ramboll, and its environmental remediation subcontractors along with the representatives of the United States Environmental Protection Agency ("U.S. EPA") and the Wisconsin Department of Natural Resources ("WDNR") and their contractors, require temporary access to the Site for the purpose of monitoring well installation and soil borings and performing additional soil and groundwater sampling (the "Work") required by and overseen by the U.S. EPA as further described in the approved work plan(s) attached as Exhibit A. In consideration of the mutual promises contained in this Agreement, t he sufficiency of which is hereby expressly acknowledged, the Parties agree as follows. AGREEMENT 1. Grant of Access. The City grants to WPSC, its agents, representatives, employees, contractors, subcontractors, consultants, and invitees (collectively, the "WPSC Access Parties"), as well as representatives of U.S. EPA, the WDNR and their contractors (collectively, the "G overnment Access Parties") temporary access to the Site, under the conditions set forth in this Agreement, to complete the Work, as further described in the work plan(s) attached as Exhibit A. 2. Condition of Site - No Representation. The City makes no representation as to any physical condition of the Site or the suitability of the Site for the Work intended to be conducted by the WPSC Access Parties. The WPSC Access Parties shall rely solely on their own examination and investigation of the Site, including any surface or subsurface conditions. 3. Location of Work. The area where the Work is anticipated to be performed is shown on the Figure 1 within Exhibit A. To the extent Work extends beyond property owned by the City, WPSC is responsible for arranging access to such other property. 4. Scheduling and Conduct of the Work. The WPSC Access Parties expect to commence the Work by November 1, 2025. Recognizing that the newly installed monitoring wells would be resampled on a semi-annual basis during future ongoing routine monitoring events at the Page 3 of 35 2 property. The Work is anticipated to be completed within two weeks of commencement subject to conditions specified below. The City acknowledges this schedule is subject to change, depending upon weather conditions, determinations or additional approvals by U.S. EPA before or during the time the Work is conducted, and/or other unanticipated circumstances, such as but not limited to, adverse weather or contractor availability/ delays. The WPSC Access Parties will conduct the Work as set forth in Exhibit A, unless U.S. EPA requires a modification to the work in which case the Work shall be conducted in accordance with the U.S. EPA approved modification. WPSC shall provide the City with a copy of the U.S. EPA approved modification. In the event timely completion of the Work requires the WPSC Access Parties to conduct the Work during times or days other than as set forth in Exhibit A, WPSC will obtain consent from the City prior to conducting the Work during such times (see Paragraph 6 below). WPSC acknowledges and understands that the City may host events at this location. WPSC agrees to take into account the schedule of events in planning its work at this location upon advanced notice of such events. WPSC will provide the City advance notice of at least 7 days prior to initiating and conducting the Work. 5. Performance of Work. The Parties agree to the following conditions with regard to the performance of the Work. a. WPSC Access Parties will notify Digger’s Hotline to identify public utilities and contract with a private utility locating subcontractor to make all reasonable attempts to identify and locate private utilities in the vicinity of the proposed boring locations. b. Local Permit Exemption. WPSC represents that, under Section 121(e)(l) of CERCLA, codified at 42 U.S.C. § 9621(e)(l), and the associated federal regulations (the "Superfund Permit Waiver"), the WPSC Access Parties’ are exempt from applying for and/or obtaining any and all federal, state, and local permits in association with the Work. Accordingly, to the extent allowed under federal law and regulation, the WPSC Access Parties are not required to obtain any of the permits or approvals (or pay any fees for such permits or approvals) described in the City's Municipal Code ("City Code"), including but not limited to Chapter 31. c. Exhibit A to this Agreement is the WPSC Access Parties U.S. EPA approved work plan(s). The terms and conditi ons of Exhibit A and any U.S. EPA approved modifications are incorporated into this Access Agreement. d. Noise, Odor, Dust, and Other Nuisances. The City acknowledges that elements of the Work will necessarily involve elevated noise levels. To the extent necessary, the City excepts the WPSC Access Parties from any City Code provisions limiting or regulating noise, odor, dust, and any other nuisance that may occur in connection with the Work; provided, however, that the WPSC Access Parties shall not unnecessarily engage in or permit any loud or disturbing noise of such character, intensity or duration as to be detrimental to the life or health of individuals and shall limit the production of high noise levels that may otherwise exceed the City Code levels to between the hours of 7:00 AM and 7:00 PM, Monday through Friday. 6. Cooperation. The Parties will cooperate in good faith with each other Page 4 of 35 3 in the performance of the Work. WPSC and the City shall appoint designated representatives for coordinating the Work activities and addressing any issues or concerns that arise during the performance of the Work. The designated representatives also shall coordinate with representatives of the Government Access Parties. To the extent the City is aware of any underground structures and/or utilities (such as pipes or septic systems) located on the Site, the City will provide WPSC with any available information regarding these structures and/or utilities before the WPSC Access Parties commence the Work. The WPSC Access Parties will be responsible for contacting "Diggers Hotline" or a comparable public utility locating service and a private utility locating subcontractor at their own expense to make all reasonable attempts to identify and locate any underground utilities on the Access Property. 7. U.S. EPA Authority. U.S. EPA is directing the Work under the Consent Decree and its authority as set forth in the NCP. Under the Consent Decree, U.S. EPA m ay require WPSC to perform Work in a manner that is in conflict with this Agreement. In the event U.S. EPA exercises its authority and directs WPSC to unde rtake work contrary to any term or provision of this Agreement, such direction of U.S. EPA shall control, and WPSC shall not be considered in breach of this Agreement. WPSC will promptly notify the City representative in the event WPSC receives any such direction from U.S. EPA. 8. Restoration and Waste Disposal . The WPSC Access Parties will use their best efforts to minimize disruption to the Site in conducting the Work, consistent with the nature of the Work itself. Boreholes will be properly abandoned and will be completely filled with bentonite granules, bentonite chips, bentonite slurry, etc. Sealing material will be placed via gravity. Sealing material will be placed in the borehole in a manner that detects and prevents bridging and displaces the borehole water column, if present. Borehole bentonite granules and chips will be hydrated in lifts if the borehole is dry or does not contain sufficient borehole water . Monitoring wells will be constructed with flush mount caps, consistent with the description in Exhibit A. WPSC will be responsible for removal, proper handling/management and disposal of any investigative derived waste generated during the Work. 9. Title to the Site. The City represents and warrants that it has good and indefeasible fee simple title to the Site as of the date of this Agreement, free and clear of all liens and encumbrances, and that it has the authority to grant access to the WPSC Access Parties to perform the Work on the Site. 10. Indemnification. WPSC agrees to indemnify and hold the City, its officers, employees, representatives, consultants and agents harmless from and against any and all injuries, death, damages, claims, losses, demands, penalties, expenses, or liabilities (cumulatively "Losses") arising out of or relating to the WPSC Access Parties' performance of the Work, except to the extent such Losses are caused by or arise from the City's or third parties (other than the WPSC Access Parties) negligence, actions or omissions. This indemni ty shall not cover any Losses caused by the City or any third party who is not an agent, employee, contractor, subcontractor, or invitee of WPSC unless the Losses to the extent caused by a third party arise from the wrongful, intentional or negligent act or omission of one or more WPSC Access Parties. This indemnity also does not apply to any environmental matters covered in Paragraph 11 below. This paragraph shall survive the termination, revocation or expiration of Page 5 of 35 4 this Agreement. 11. Environmental. The WPSC Access Parties will employ the methods and procedures called for in the U.S. EPA approved Work Plan (Exhibit A). WPSC shall require the WPSC Access Parties, as part of the contr act with WPSC, to comply with these methods and procedures, as applicable to the Work performed. WPSC shall be solely responsible for and pay for the investigation and remediation for any ex acerbation of MGP related environmental contamination o n the Site caused by the WPSC Access Parties wh ile performing Work under this Agreement. WPSC Access Parties agree to only collect samples from locations and depth intervals as identified in the Work Plan (Exhibit A) and provide the City with all results from any sampling performed within the park no later than 10 days of WPSC Access Parties receiving the final laboratory reports in accordance with Wisconsin Administrative Code § NR 716.14(2). 12. Insurance. The WPSC Access Parties shall hav e liability insurance, including comprehensive general liability insurance, automobile liability insurance, and pollution legal liability insurance, of at least $2,000,000 per occurrence and will provide adequate proof of such insurance upon request. Such insurance shall name the City as an additional insured. WPSC shall have the right to self-insure the above requirements. 13. Binding Effect. All provisions of this Agreement, including the benefits and burdens, run with the land and are binding upon and inure to the benefit of the Parties h ereto and their heirs, personal representatives, successors, and assigns. 14. Compliance with Laws. Except as provided elsewhere in this Agreement, the WPS C Access Parties will comply with all applicable federal, state, or local laws, ordinances, rules, orders, or regulations in conducting the Work, with the exception of those laws, ordinances, rules, orders, or regulations from which the WPSC Access Parties are exempt under the Superfund Permit Waiver, or from which the WPSC Access Parties are exempt under the terms of the U.S. EPA approved Work, as may be modified by U.S. EPA (Exhibit A), or where U.S. EPA, exercising its lawful authority, supersedes any contrary laws, ordinances, rules, orders or regulations. 15. Term. This Agreement shall terminate on the date on which the WPSC Access Parties complete the Work or October 1, 2026, whichever is later, unless the Parties mutually agree otherwise in w riting. 16. Notices. Notices relating to this Agreement shall be sent to the following: Notice to WPSC shall be addressed to: Wisconsin Public Service Corporation PO Box 19001 Green Bay, Wisconsin 54307-9001 Attn: Real Estate Department Page 6 of 35 5 N otice to the City shall be addressed to: City of Stevens Point 1515 Strongs Avenue Stevens Point, WI 54481 Attn: ___________________ 17. No Admissions. This Agreement shall not constitute or be used as evidence of any admission of law, fact, or liability or a waiver of any right or defense by WPSC or the City. 18. Choice of Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Wisconsin. 19. Authority to Enter into Agreement. Each person signing this Agreement represents and warrants tha t he or she has the full power and authority to enter into and be bound by this Agreement. [Signature Page Follows] W ISCONSIN PUBLIC SERVICE CORPORATION DATED__________________ By: WEC Business Services LLC, Its affiliate and agent B y: _________________________ Kory J. Rentmeester Manager Property Management C ITY OF STEVENS POINT, WISCONSIN D ATED__________________ By: __________________________ Its _______________________ Page 7 of 35 September 19, 2025 Ms. Clara Copps Remedial Project Manager USEPA Region 5 77 West Jackson Boulevard Chicago, Illinois 60604-3590 RE: Additional Studies Work Plan Technical Memorandum – Revision 0 Former WPSC Stevens Point MGP, Stevens Point, Wisconsin Wisconsin Public Service Corporation CERCLA Docket No. V-W-06-C-847; Civil Action No. 14-cv-546 Dear Ms. Copps: On August 4, 2025, United States Environmental Protection Agency (USEPA) issued a letter directing WPS to undertake additional investigation activities in the vicinity of soil and groundwater impacts previously identified in Pfiffner Pioneer Park located adjacent to the Wisconsin Public Service Corporation’s (WPSC) Former Stevens Point Manufactured Gas Plant (MGP) Site (the “Site”). In the August 4, 2025 letter, USEPA directed WPSC to carry out the following actions to address concerns regarding the contamination in the park: 1. Perform step out soil and groundwater sampling to the north and east of SB-324 and SB-325 to a depth of at least 15 feet to further delineate the contamination and assess potential risks to human health and the environment. 2. Sample surface water and sheen in the rain garden within the Park to determine whether Site-related contamination is reaching the surface and/or impacting the rain garden. 3. To carry out the sampling identified under #1 and #2 above, EPA requests the PRPs submit an Additional Studies Work Plan within 90 calendar days of the date of this letter. In response to the request by USEPA, please find enclosed the Additional Studies Work Plan Technical Memorandum – Revision 0 for the WPSC Former Stevens Point MGP Site. If you need additional information or would like to discuss, please contact me at 414 -221-2156 or via email at frank.dombrowski@wecenergygroup.com. Sincerely, Frank Dombrowski Principal Environmental Consultant Enclosures as noted CC: Elizabeth Nightingale, USEPA Amanda Urban, USEPA Rex Key, WPSC Matthew Vitale, WDNR Dan Kremer, City of Stevens Point William Nelson, Godfrey & Kahn Brian Hennings, Ramboll Andrew Cawrse, Ramboll Page 8 of 35 1/8 September 19, 2025 Ramboll 234 W. Florida St Fifth Floor Milwaukee, WI 53204 USA https://ramboll.com Technical Memorandum Project name WPSC Stevens Point MGP Site – Additional Studies Work Plan Project no. 1940105129 Client Wisconsin Public Service Corporation Version 0 To Frank Dombrowski From Andrew Cawrse Prepared by Andrew Cawrse Checked by Brian Hennings Approved by Brian Hennings 1. INTRODUCTION United States Environmental Protection Agency (USEPA) directed in a letter to Wisconsin Energy Corporation, dated August 4, 2025, to further investigate contamination identified in Pfiffner Pioneer Park located to the west of the former Wisconsin Public Service Corporation (WPSC) Stevens Point Manufactured Gas Plant (MGP) site (Figure 1) by performing additional soil, groundwater, and surface water sampling. This technical memorandum addresses the following directives from USEPA : 1. Perform step out soil and groundwater sampling to the north and east of SB-324 and SB-325 to a depth of at least 15 feet to further delineate the contamination and assess potential risks to human health and the environment. 2. Sample surface water and sheen in the rain garden within the Park to determine whether Site-related contamination is reaching the surface and/or impacting the rain garden. 3. To carry out the sampling identified under #1 and #2 above, EPA requests the PRPs submit an Additional Studies Work Plan within 90 calendar days of the date of this letter. 2. BACKGROUND Pfiffner Pioneer Park is located adjacent to the former WPSC Stevens Point MGP site to the west (Figure 2). Based on review of historical documentation, the portion of the park adjacent to the former MGP site was historically occupied by a lumber mill and lumber yard with railroad lines and spurs crossing the area. A former slough historically adjoined the MGP site to the south and ran through the present day Pfiffner Pioneer Park. The width of the slough varied over time with a portion of the slough being identified as “filled with mill refuse” in historic Sanborn Fire Insurance Maps. The former slough was filled in as part of the City of Stevens Point storm sewer reconstruction project between 1981 and 1985, with the exception of the western end of the slough which was partially filled to create a pond currently located between wells OW17 and OW16 (Figure 2). Page 9 of 35 2/8 3. PRIOR INVESTIGATION As discussed in the August 10, 2020 Pfiffner Pioneer Park Water Garden letter report by Sand Creek Consultants (Sand Creek), a sheen was observed on the water in a rain garden located to the north of the pond and south of the Cultural Commons in Pfiffner Pioneer Park (Figure 2). Staff with the City of Stevens Point collected a sample of the water from the rain garden and submitted the sample for analysis of polycyclic aromatic hydrocarbons (PAHs). The laboratory analytical results identified PAHs in the water sample and the City of Stevens Point retained Sand Creek to collect additional samples and evaluate the site conditions. Sand Creek collected two soil samples and two surface water samples from the rain garden for analysis of PAHs. Results of the analysis identified soil and water PAH impacts and the City of Stevens Point notified Wisconsin Department of Natural Resources (WDNR) of a hazardous substance discharge. A WDNR Environmental Repair Program (ERP) case (BRRTS Activity No. 02-50-586876) was opened on August 11, 2020 for the release. 3.1 STANTEC SITE INVESTIGATION SUMMARY In May 2021, a Limited Site Investigation (LSI) was completed on behalf of the City of Stevens Point by Stantec Consulting Services Inc. (Stantec) to evaluate the nature and extent of soil and groundwater impacts associated with the samples collected from the rain garden. Based on the results of the LSI, Stantec completed additional investigation activities in November 2021 and September 2022. Soil boring and temporary well locations completed by Stantec are depicted on Figure 3. Results of the investigations identified select PAHs, volatile organic compounds (VOCs), and lead in soil at concentrations exceeding their respective chapter NR720 Wisconsin Administrative Code (WAC) groundwater pathway residual contaminant levels (RCLs). In addition, select VOCs and PAHs were also detected above their respective non-industrial direct contact and/or industrial direct contact RCLs. Groundwater analysis identified select PAHs at concentrations exceeding their respective chapter NR140 WAC (NR140) enforcement standard (ES) and arsenic at concentrations exceeding the NR140 preventative action limit (PAL) but below the ES in groundwater. Subsurface conditions encountered during the Stantec investigation consisted of medium to coarse grained sand followed by intervals of wood and silt to depths of 16 feet below ground surface (bgs), the maximum depth of the borings. Fill material consisting of coal fragments, slag, and glass was encountered to depths of 6 feet bgs. Non-aqueous phase liquid (NAPL) was observed between 6 to 8 feet bgs at boring SB5 (boring log included in Attachment 1), which is located on the west side of the park near the Wisconsin River (Figure 3). A soil sample was collected from the 6-8 foot interval and analyzed for VOCs and PAHs. Based on the results: • VOCs 1,2,4-trimethylbenzene and 1,3,5-trimethylbenzene were detected at concentrations exceeding the groundwater pathway RCL and naphthalene was detected at a concentration exceeding the groundwater pathway RCL and industrial direct contact RCL. • Fourteen PAHs, including naphthalene, were detected at a concentration exceeding their respective groundwater pathway, non-industrial direct contact, and/or industrial direct contact RCLs Stantec Soil Analytical Results Tables 2b and 2c are included as Attachment 1. Following completion of soil sampling activities, temporary well TW5 was installed in boring SB5 with a screened interval of 3 to 13 feet bgs. A groundwater grab sample was collected from TW5 and analyzed for VOCs, PAHs, arsenic, and lead. Based on the results: Page 10 of 35 3/8 • Naphthalene was the only detected VOC exceeding the ES. • PAHs benzo(a)pyrene, benzo(b)fluoranthene, chrysene, and naphthalene were detected at concentrations exceeding their respective ESs. • Arsenic was detected at a concentration exceeding the PAL but below the ES. Stantec Groundwater Analytical Results Tables 3a, 3b and 3c are included as Attachment 1. 3.2 RAMBOLL SITE INVESTIGATION SUMMARY At the direction of USEPA, on September 4, 2024, additional investigation was performed by Ramboll to further delineate of the nature and extent of the soil and groundwater impacts identified at Stantec soil boring/temporary well SB5/TW5. Soil borings were installed at the seven locations (SB-322 through SB- 328) in the vicinity of Stantec soil boring SB5 as shown on Figure 3. The soil borings were advanced using a direct-push method to define the presence/absence and vertical extent of impacted soil at each boring location and extend to a depth of at least 15 feet bgs. During field sampling activities, the presence of MGP-related impacts was observed in four soil boring locations (SB-323 through SB-326) and the monitoring well (OW24) location. As such, two samples were collected from each of these locations for laboratory analysis. Soil samples were not collected from borings SB-322, SB-327, or SB-328 as the presence of MGP-related impacts was not observed at these borings. Soil analytical results were compared to site-specific USEPA Cleanup Levels (CLs) that were established in the Record of Decision (ROD) dated September 25, 2012. Based on the results of the soil investigation: • Benzene was not detected at concentrations above the laboratory detection limit in any of the soil samples. Low level concentrations of trimethylbenzenes, ethylbenzene, and xylenes were detected but these PVOCs do not have CLs identified in the ROD. • PAHs, including naphthalene, were detected at concentrations exceeding the CLs in samples collected from impacted fill material. However, there were no PAH CL exceedances in any of the samples collected from the native sand material below the interval of potential impacts. • PVOCs and PAHs were not detected at concentrations exceeding their respective CLs in the soil samples collected from boring SB-323, which is the southernmost boring closest to the pond. • Soil impacts were not observed in the three borings located closest to the Wisconsin River. The soil analytical results are presented in Table 1. Following soil boring installation, one monitoring well (OW24) was installed in the vicinity of Stantec temporary well TW5 as shown on Figure 3. The monitoring well was constructed with a 2-inch inner diameter polyvinyl chloride well with a 10 foot 0.01-inch factory slotted screen that was set from 3 to 13 feet bgs, the same screened interval as temporary well TW5. Monitoring well OW24 was sampled for groundwater using low-flow sample techniques at the same time as the October 2024 and April 2025 semi-annual sampling of existing wells. Field parameters were measured using a flow-through cell. The presence of DNAPL was not observed at well OW24 following installation and development activities or during the groundwater sampling. Groundwater analytical results were compared to site-specific USEPA CLs that were established in the ROD dated September 25, 2012. Page 11 of 35 4/8 Based on the results of the groundwater sampling: • Benzene and naphthalene were detected at concentrations below their respective CLs at well OW24 during both the October 2024 and April 2025 sampling events. • Benzo(a)anthracene was detected at a concentration exceeding the CL at well OW24 during the October 2024 sampling event. Benzo(a)anthracene was not detected at well OW24 during the April 2025 sampling event. • No other PAHs were detected at concentrations exceeding their respective CLs during both the October 2024 and April 2025 sampling events. • Iron was detected at concentrations exceeding the CL during both the October 2024 and April 2025 sampling events. However, semi-annual sampling results for the site indicates background concentrations of iron in groundwater are significantly higher than the CL. The groundwater analytical results for well OW24 are presented in Table 2. 4. PROPOSED SUPPLEMENTAL SAMPLING ACTIVITIES Per the directives in EPA’s communication of August 4, 2025, additional investigation will be performed to complete delineation of the nature and extent of the soil and groundwater impacts to the north and east of SB-324 and SB-325. The supplemental investigation activities described below will be performed in accordance with the site-specific information included in the Multi-Site Field Sampling Plan (FSP) – Revision 4 (IBS, 2008). 4.1 SOIL BORING AND SAMPLING Health and Safety Plan A site-specific health and safety plan (HASP) was prepared prior to initiating field activities in 2024. The HASP will be updated as necessary and followed by all field personnel for the on-site work. Underground Utility Locate The drilling company will notify Digger’s Hotline to identify public utilities in the area of proposed sampling. To obtain subsurface clearance for private utilities on site, Ramboll will discuss proposed boring locations with knowledgeable site personnel, if available, prior to advancement of borings. Ramboll will also contract with a private utility locating subcontractor to locate private utilities in the vicinity of the proposed boring locations. 4.1.1 SOIL BORING LOCATIONS Soil borings will be installed in the park and Cultural Commons area at the six soil boring locations (SB-329 through SB-334) and seven contingency soil boring locations (SB-335 through SB-341) as shown on Figure 3. The contingency soil borings will only be installed in the vicinity of any soil boring locations that exhibit field observations of MGP-residuals. Locations may be field modified as needed based on the field-identified locations of utilities. Soil borings will be advanced using a direct-push method with efforts made to limit disturbances to the park and Cultural Commons. Sampling will be continuous to define the presence/absence and vertical extent of MGP-impacted soil at each boring location and extend to a depth of at least 15 feet bgs. All borings advanced as part of the investigation will be continuously logged, following Multi-Site standard SOP SAS-05-02, the presence of fill material, moisture content, photoionization detector Page 12 of 35 5/8 readings, the nature of each geologic unit encountered, and visual and olfactory observations indicating the presence of NAPL (e.g., oil-coated, or oil-wetted). Soil boring locations will be recorded per Multi-Site SOP SAS-03-03, and will be abandoned following the methods described in Multi-Site SOP SAS-05-05. Field equipment will be calibrated prior to use, as required by Multi-Site SOP SAS-02-01 from the Multi-Site FSP. Historical documentation indicates that the area was filled with mill refuse and recent investigation observations confirm that MGP-residuals in the vicinity of the former slough were buried with fill material not associated with the former MGP site. As such, soil samples will not be collected from soil borings that do not exhibit field observations of MGP-residuals since impacts in the shallow fill material are likely attributed to the historical activities at Pfiffner Pioneer Park and mill refuse used to fill this area. The soil impacts associated with the fill material in the park is currently being addressed as part of WDNR ERP case 02-50-586876. Subsurface soil samples will be collected as follows: • Soil samples will not be collected for borings that show no visual, olfactory, or PID indication of MGP- related impacts. These borings will be continuously logged, following Multi-Site standard SOP SAS 05-02, the presence of fill material, moisture content, photoionization detector readings, and the nature of each geologic unit encountered. • For borings that indicate the presence of MGP-related contamination (through visual, olfactory, or PID indication), one sample of impacted material will be collected. A second sample will also be collected below the interval(s) of potential impacts, to document vertical extent. All soil samples will be submitted to a Wisconsin certified laboratory (Pace Analytical of Green Bay, Wisconsin or Eurofins, Chicago, IL) for Contaminants of Potential Concern (COPCs) consistent with the Sampling and Analysis Plan Summary (Table 8 of the April 26, 2007 Remedial Investigation and Feasibility Study (RI/FS) Site Specific Work Plan Revision 1 (SSWP) included as Attachment 2). The SSWP was prepared by Natural Resource Technology, Inc. (NRT) and USEPA conditionally approved the SSWP on July 11, 2007. Soil sample analysis will include: • Petroleum volatile organic compounds (PVOCs) via USEPA Method 8260 (Benzene, Ethylbenzene, Toluene, Total Xylenes, 1,2,4-Trimethylbenzene, 1,3,5-Trimethylbenzene, Methyl Tert-Butyl Ether) • PAHs via USEPA Method 8270 (1-Methylnaphthalene, 2-Methylnaphthalene, Acenaphthene, Acenaphthylene, Anthracene, Benzo(a)anthracene, Benzo(a)pyrene, Benzo(b)fluoranthene, Benzo(g,h,i)perylene, Benzo(k)fluoranthene, Chrysene, Dibenz(a,h)anthracene, Fluoranthene, Fluorene, Indeno(1,2,3-cd)pyrene, Naphthalene, Phenanthrene, Pyrene) A soil sampling and analysis plan summary is presented in Table 3. Quality control (QC) samples will be collected as required by Multi-Site FSP SOP SAS-04-03 and as shown in Table 3. Samples will be labeled and packaged in accordance with Multi-Site FSP SOP SAS-03-01 and shipped using chain-of-custody procedures described in Multi-Site FSP SOP SAS-03-02. Equipment will be decontaminated after use in accordance with Multi-Site FSP SOP SAS-04-04. Page 13 of 35 6/8 4.2 TEMPORARY WELL INSTALLATION AND GROUNDWATER SAMPLING 4.2.1 Temporary Well Installation Based on prior groundwater sampling activities, groundwater in the vicinity of the site investigation area flows east-northeast, away from the Wisconsin River. Following soil boring installation, one temporary monitoring well (TW-332) will be installed north and east of the impacted area as shown on Figure 3. In addition, one temporary monitoring well may be installed at one of the contingency soil boring locations if any of the contingency soil boring locations exhibit field observations of MGP-residuals, or if groundwater impacts exceeding CLs are documented in TW-332. The exact location of the contingency temporary well will depend on field observations. The temporary well(s) will be constructed according to Multi-Site SOP SAS-05-03. A 1-inch inner diameter polyvinyl chloride well with a 10 foot 0.01-inch factory slotted screen will be set from approximately 5 to 15 feet bgs, and the annular space around the well will be backfilled with clean sand filter pack, bentonite seal, and finished with a steel flush mount cover. The temporary wells will be constructed with a minimum 3-foot annular seal. 4.2.2 WELL DEVELOPMENT Following installation, the temporary well(s) will be developed in accordance with Multi-Site SOP SAS-05-04. Field parameters (specific conductance, pH, temperature, dissolved oxygen, oxidation- reduction potential, and turbidity) will be measured during development. The well(s) will be considered developed when field parameters meet the stabilization criteria detailed in Multi-Site SOP SAS-05-04. 4.2.3 GROUNDWATER SAMPLING The temporary well(s) will be sampled for groundwater using low-flow sample techniques, in accordance with Multi-Site SOP SAS-08-02. Groundwater sampling will be conducted within two months following well installation. Field parameters will be measured using a flow-through cell. Samples will be submitted to Pace Analytical of Green Bay, Wisconsin for analysis consistent with the Summary Required Analytes Based on Purpose (Table 3 of the Natural Attenuation Implementation Plan (NAIMP), Attachment 2). The NAIMP was submitted as an appendix to the August 25, 2014 Final Remedial Design, Revision 0 (Modified) prepared by NRT and approved by USEPA on October 22, 2014. • Benzene via USEPA Method 8260 • 10 PAHs via USEPA Method 8270 (Benzo(a)anthracene, Benzo(a)pyrene, Benzo(b)fluoranthene, Benzo(k)fluoranthene, Chrysene, Dibenzo(a,h)anthracene, Fluoranthene, Indeno(1,2,3- cd)pyrene, Naphthalene, and Pyrene) • Iron, total and dissolved via USEPA Method 6010D • Field parameters (Specific Conductance, pH, Temperature, Dissolved Oxygen, Oxidation- Reduction Potential, and Turbidity) A groundwater sampling and analysis plan summary is presented in Table 3. Quality control (QC) samples will be collected as required by Multi-Site FSP SOP SAS-04-03 and as presented in Table 3. Samples will be labeled and packaged in accordance with Multi-Site FSP SOP SAS-03-01 and shipped using chain-of-custody procedures described in Multi-Site FSP SOP SAS-03-02. Equipment will be decontaminated after use in accordance with Multi-Site FSP SOP SAS-04-04. Page 14 of 35 7/8 The need for additional sampling of the temporary well(s) will be evaluated once the results of the initial round of sampling results have been received. If groundwater analytical results do not exceed groundwater CLs, the temporary well(s) will be abandoned following approval to do so from USEPA. 5. RAIN GARDEN SURFACE WATER AND SHEEN SAMPLING If surface water is present in the rain garden at the time of the soil and groundwater investigation activities, one surface water sample will be collected from the rain garden depicted on Figure 3 in accordance with Multi-Site SOP SAS-09-01. The surface water grab sample will be collected from the top 12 inches of the water column in a manner that avoids disturbance of sediments. If a sheen is present, a sample of the sheen will also be collected. A sampling device will be used to skim the surface of the water to collect a sample of the sheen. The sheen sample collection method will depend on the site conditions (e.g. depth of surface water, quantity of sheen present) observed in the field during the investigation activities. If water is not present in the rain garden at the time of the sampling event, no sample will be collected. The surface water sample and sheen sample (if present) will be submitted to a Wisconsin certified laboratory (Pace Analytical of Green Bay, Wisconsin or Eurofins, Chicago, IL) for COPCs consistent with the Sampling and Analysis Plan Summary (Table 8 of the April 26, 2007 RI/FS SSWP included as Attachment 2). Surface water sample and sheen sample analysis will include: • PVOCs via USEPA Method 8260 (Benzene, Ethylbenzene, Toluene, Total Xylenes, 1,2,4- Trimethylbenzene, 1,3,5-Trimethylbenzene, Methyl Tert-Butyl Ether) • PAHs via USEPA Method 8270 (1-Methylnaphthalene, 2-Methylnaphthalene, Acenaphthene, Acenaphthylene, Anthracene, Benzo(a)anthracene, Benzo(a)pyrene, Benzo(b)fluoranthene, Benzo(g,h,i)perylene, Benzo(k)fluoranthene, Chrysene, Dibenz(a,h)anthracene, Fluoranthene, Fluorene, Indeno(1,2,3-cd)pyrene, Naphthalene, Phenanthrene, Pyrene) A surface water and sheen sampling and analysis plan summary is presented in Table 3. 6. DISPOSAL OF INVESTIGATIVE DERIVED WASTE Investigative derived wastes (IDW) will be containerized during site investigation activities. Soil, purge water, and investigation decontamination water will be disposed of offsite. Disposal activities will be completed in accordance with applicable state and federal regulations, and the methods described in Section 9 of the Multi Site FSP, Rev 4 (IBS, 2008). All disposal will be completed in accordance with the “Off-Site Rule” (September 1993, USEPA) for the disposal of IDW. 7. SCHEDULE AND REPORTING Soil boring and temporary monitoring well installation is proposed to be completed in October or November 2025 following USEPA-approval of this work plan pending subcontractor availability and access agreement execution with the current landowner. Results of the investigation, if available, will be incorporated into the 2025 Groundwater Annual Report, which will be submitted within 90 days of the October 2025 sampling event. Page 15 of 35 8/8 TABLES Table 1 Soil Analytical Results Table 2 Groundwater Analytical Results Table 3 Sampling and Analysis Plan FIGURES Figure 1 Site Location Map Figure 2 Site Layout Figure 3 Proposed Soil Boring and Temporary Well Locations ATTACHMENTS Attachment 1 Stantec Boring Log SB5 and Tables 2b, 2c, 3a, 3b, and 3c Attachment 2 Sampling and Analysis Plan Summary and Summary Required Analytes Based on Purpose REFERENCES Natural Resource Technology. Remedial Investigation / Feasibility Study Site Specific Work Plan. April 26, 2007 Natural Resource Technology. Final Remedial Design, Revision 0 (Modified). August 25, 2014 Sand Creek Consultants. Pfiffner Pioneer Park Water Garden. August 10, 2020 Stantec Consulting Services Inc. Limited Site Investigation. June 14, 2021 Page 16 of 35 TABLES Page 17 of 35 Table 1. Soil Analytical Results Wisconsin Public Service Corporation - Former Stevens Point Manufactured Gas Plant Site 1111 Crosby Avenue, Stevens Point, Wisconsin USEPA WIN000509983 / BRRTS # 02-50-000079 / FID # 750081200 Field Sample ID Sample Location Sample Depth (feet bgs) Sample Date Reporting Units: Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Site-Specific USEPA Cleanup Level: OW-24 (2.9-3.2) OW-24 2.9-3.2 9/4/2024 6.0 3.24 J 1.06 U 1.06 U 1.12 U 3.21 U 1.31 U 93.5 171 185 20.3 J 138 113 81.2 J 84.7 J 44.8 J 38.6 J 87.4 J 12.9 U 279 147 35.8 J 87.1 J 445 207 28.1 OW-24 (6.5-7.6) OW-24 6.5-7.6 9/4/2024 0.0204 U 0.0220 U 0.0163 U 0.0163 U 0.0172 U 0.0494 U 0.0201 U 0.0524 0.0915 0.121 0.0133 J 0.101 0.0607 0.0525 0.0544 0.0233 0.0241 0.0481 0.0069 J 0.162 0.0958 0.0217 0.0519 0.269 0.106 15.5 SB-323 (6.5-7.5) SB-323 6.5-7.5 9/4/2024 0.227 J 0.120 U 0.0889 U 0.0889 U 0.0941 U 0.270 U 0.110 U 4.36 2.31 11.3 0.224 J 0.212 J 0.159 J 0.177 J 0.187 J 0.211 U 0.154 U 0.227 U 0.167 U 0.373 J 4.24 0.251 U 6.77 1.39 0.271 J 72.2 SB-323 (10-12) SB-323 10-12 9/4/2024 0.0206 U 0.0223 U 0.0165 U 0.0165 U 0.0174 U 0.0499 U 0.0203 U 0.0029 U 0.0029 U 0.0031 J 0.0025 U 0.0025 U 0.0026 U 0.0023 U 0.0028 U 0.0035 U 0.0025 U 0.0038 U 0.0028 U 0.0033 J 0.0024 U 0.0042 U 0.0043 J 0.0029 J 0.0029 U 16.1 SB-324 (5-6.2) SB-324 5-6.2 9/4/2024 18.6 7.99 J 2.48 U 4.43 J 2.62 U 13 J 3.06 U 94.6 176 150 19.7 J 104 75.4 65.6 63.1 39.3 J 31 J 65.7 7.47 J 207 106 30.9 J 119 315 156 24.9 SB-324 (10-12) SB-324 10-12 9/4/2024 0.0226 U 0.0244 U 0.0180 U 0.0180 U 0.0191 U 0.0547 U 0.0223 U 0.0407 0.0726 0.0701 0.0100 J 0.0479 0.0392 0.0400 0.0407 0.0254 0.0176 J 0.0335 0.0067 J 0.0994 0.0488 0.0229 0.0663 0.130 0.0787 20.4 SB-325 (2.8-3.6) (N) SB-325 2.8-3.6 9/4/2024 26.6 12.3 J 1.93 U 5.84 J 2.05 U 6.05 J 2.39 U 169 311 325 29.5 J 214 143 128 133 59 54.3 107 11 J 401 213 42.2 635 701 297 30.7 SB-325 (7-8) SB-325 7-8 9/4/2024 0.0191 U 0.0206 U 0.0152 U 0.0152 U 0.0161 U 0.0462 U 0.0188 U 0.0052 J 0.0088 J 0.0113 J 0.0024 U 0.0109 J 0.0125 J 0.0102 J 0.0107 J 0.0053 J 0.0051 J 0.0088 J 0.0026 U 0.0236 0.0085 J 0.0043 J 0.0187 J 0.0308 0.0178 J 12.2 SB-326 (1.8-2.6) SB-326 1.8-2.6 9/4/2024 41.3 19.7 J 9.17 U 28.3 J 9.71 U 53.2 J 11.3 U 31 53 48.2 8.40 J 44.8 53.9 49.5 46.4 28.9 24.8 45.4 6.02 J 131 40.9 21.0 J 163 125 93.2 31.6 SB-326 (8-9) SB-326 8-9 9/4/2024 0.0212 U 0.0229 U 0.0169 U 0.0169 U 0.0179 U 0.0514 U 0.0209 U 0.0030 U 0.0030 U 0.0026 U 0.0025 U 0.0025 U 0.0026 U 0.0023 U 0.0028 U 0.0035 U 0.0026 U 0.0038 U 0.0028 U 0.0025 J 0.0024 U 0.0042 U 0.0043 J 0.0023 U 0.0030 U 17.5 TB-1-20240904 TB-1 Trip blank 9/4/2024 0.0149 U 0.0161 U 0.0119 U 0.0119 U 0.0126 U 0.0361 U 0.0147 U -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- [O: GKJ 9/18/24, C:ECB 9/23/2024] Analyte concentration exceeds the standard for: Screening Levels: Bold Site-Specific USEPA Cleanup Level The site-specific USEPA Cleanup Levels were established in the Record of Decision (ROD) dated September 25, 2012 Results & Flags: -- = Analysis not performed J = Estimated Concentration U = Concentration was not detected above the reported limit Acronyms: (N) = Normalized sample locations created from combining parent and field duplicate samples following EPA protocol BGS = Below ground surface BRRTS = Bureau for Remediation and Redevelopment Tracking System DF 2 = Dilution Factor of 2 GW = Groundwater FID = facility identification number mg/kg = milligrams per kilogram MGP = Manufactured Gas Plant NS = No Screening Level PAH = Polycyclic Aromatic Hydrocarbon PVOC = Petroleum Volatile Organic Compound TB = trip blank USEPA = United States Environmental Protection Agency Lab comments, additional data qualifiers and definitions can be found in associated laboratory and validation reports. NS NS 5.4 NS NS 2.1 18 NS NS NS2.1 NS 21 210 0.21 NSNS NS NS NS NS NS NS NS 2.1 0.21 mg/kg mg/kg mg/kg mg/kg %mg/kg mg/kg mg/kg mg/kg mg/kgmg/kgmg/kg mg/kg mg/kg mg/kg mg/kg mg/kgmg/kg mg/kg mg/kg mg/kgmg/kg mg/kg mg/kg Chrysene Dibenz(a,h)anthracene Fluoranthene Fluorene Indeno(1,2,3-cd)pyrene Naphthalene Anthracene Benzo(a)anthracene Benzo(a)pyrene Benzo(b)fluoranthene Benzo(g,h,i)perylene Benzo(k)fluoranthene 1,3,5-Trimethylbenzene Methyl-tert-butyl-ether 1-Methylnaphthalene 2-Methylnaphthalene Acenaphthene Acenaphthylene 1,2,4-Trimethylbenzene mg/kg mg/kg GEO Benzene Ethylbenzene Toluene Xylenes, Total PAH PAH PAH PAH PAH PAHPAH PAH PAH PAH PAH PAHPVOC PVOC PVOC PVOC Phenanthrene Pyrene Percent Moisture PVOC PVOC PVOC PAH PAH PAH PAH PAH PAH Table 1 - Soil Analytical Results.xlsx 1 of 1 Page 18 of 35 Table 2. Groundwater Analytical Results Wisconsin Public Service Corporation - Former Stevens Point Manufactured Gas Plant Site 1111 Crosby Avenue, Stevens Point, Wisconsin USEPA WIN000509983 / BRRTS # 02-50-000079 / FID # 750081200 Sample Location Sample Date Reporting Units Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Result Flag Groundwater Clean-Up Levels: OW24 10/16/2024 0.49 J 0.080 J 0.056 U 0.040 U 0.098 U 0.055 U 0.078 U 1.2 0.068 U 44.6 0.73 14,800 14,800 849 72,100 59 U 2,200 U 4,140 OW24 4/22/2025 0.55 J 0.071 U 0.066 U 0.047 U 0.12 U 0.066 U 0.093 U 0.57 0.081 U 42.8 0.36 16,900 16,200 823 57,900 92 J 1,400 J -- [O: GKJ 5/19/25, QC: LDH 5/19/25, C: AGC 5/20/25] Sorted by Sample Location Groundwater Clean-Up Levels: Bold concentration attains or exceeds the WI Groundwater ES Underlined concentration attains or exceeds the WI Groundwater PAL Results & Flags: -- = Analysis not performed J = Estimated Concentration U = Concentration was not detected above the reported limit Lab comments, additional data qualifiers and definitions can be found in associated laboratory reports. Acronyms: -- = Analysis not performed NS = A groundwater quality standard has not been established. µg/L = micrograms per liter PAH = Polycyclic Aromatic Hydrocarbon BRRTS = Bureau for Remediation and Redevelopment Tracking System USEPA ID = United States Environmental Protection Agency site identification number EPA = Environmental Protection Agency VOC = Volatile Organic Compound FID = facility identification number WDNR = Wisconsin Department of Natural Resources MGP = Manufactured Gas Plant WI = Wisconsin NO2 + NO3 = nitrite plus nitrate NS The Remedial Action Objectives (RAOs) to protect the public and the environment for this Site are non-numerical. Therefore, a set of numerical cleanup levels were established in the Record of Decision (ROD) to provide guidance for cleaning up the (Stevens Point) Site to provide protection of human health and the environment. PAH PAH PAH PAH PAH PAH PAH NS Inorganic Benzene Benzo(a)anthracene Benzo(a)pyrene Benzo(b)fluoranthene Benzo(k)fluoranthene Chrysene Dibenz(a,h)anthracene Inorganic OrganicPAH PAH Metal Metal Metal InorganicVOC PAH µg/L µg/L µg/L µg/L µg/L Manganese, Dissolved Alkalinity, Total Nitrogen, NO2 + NO3, Total Methane Fluoranthene Indeno(1,2,3-cd)pyrene Naphthalene Pyrene Iron, Dissolved Iron, Total µg/L µg/L µg/L µg/L µg/L µg/L µg/Lµg/L µg/L µg/L µg/L µg/L Sulfate, Total µg/L 5 0.029 0.2 0.2 0.29 0.2 0.0029 400 0.029 100 250 300 300 NS NS NS Table 2 - Groundwater Analytical Results.xlsx 1 of 1 Page 19 of 35 Table 3. Sampling and Analysis Plan Wisconsin Public Service Corporation - Former Stevens Point Manufactured Gas Plant Site 1111 Crosby Avenue, Stevens Point, Wisconsin USEPA WIN000509983 / BRRTS # 02-50-000079 / FID # 750081200 PVOCs3 8260 1 per 20 1 per 20 VOC trip blanks will accompany each cooler containing VOC samples Glass Vial 2 oz. MeOH 48 hours to freeze 14 days to analyze PAHs4 8270 1 per 20 1 per 20 -- Glass 4 oz. -- 14 days to extract 40 days to analyze Benzene 8260 1 per 20 1 per 20 VOC trip blanks will accompany each cooler containing VOC samples Glass Vial 3-40 mL HCl to pH<2, Zero Headspace 14 days PAHs5 8270 1 per 20 1 per 20 -- Amber Glass 70 mL -- 7 days to extract 40 days to analyze Iron, total and dissolved 6010D 1 per 20 1 per 20 -- Plastic 250 mL HNO3 to pH<2 6 months PVOCs3 8260 1 per 20 1 per 20 VOC trip blanks will accompany each cooler containing VOC samples Glass Vial 2 oz. MeOH 48 hours to freeze 14 days to analyze PAHs4 8270 1 per 20 1 per 20 -- Glass 4 oz. -- 14 days to extract 40 days to analyze Notes: 1. Field duplicates will be collected at a frequency of 1 per 20 or fewer samples. 2. Matrix Spike/Matrix Spike Duplicate (MS/MSD) samples will be collected at a frequency of 1 per group of 20 or fewer samples. Additional volume will be determined by laboratory requirements. 3. Petroleum volatile organic compounds (PVOCs) include Benzene, Ethylbenzene, Toluene, Total Xylenes, 1,2,4-Trimethylbenzene, 13,5-Trimethylbenzene, Methyl Tert-Butyl Ether BRRTS - Bureau for Remediation and Redevelopment Tracking System HCL - Hydrochloric acid HNO3 - Nitric acid H2S04 - Sulfuric acid MeOH - Methanol MGP - manufactured gas plant mL - milliliter MS/MSD - Matrix Spike/Matrix Spike Duplicate -- - not applicable oz. - ounce PAH - polycyclic aromatic hydrocarbon PVOC - petroleum volatile organic compound USEPA - United States Environmental Protection Agency 4. Soil polycyclic aromatic hydrocarbon (PAHs) include 1-Methylnaphthalene, 2-Methylnaphthalene, Acenaphthene, Acenaphthylene, Anthracene, Benzo(a)anthracene, Benzo(a)pyrene, Benzo(b)fluoranthene, Benzo(g,h,i)perylene, Benzo(k)fluoranthene, Chrysene, Dibenz(a,h)anthracene, Fluoranthene, Fluorene, Indeno(1,2,3-cd)pyrene, Naphthalene, Phenanthrene, Pyrene 5. Groundwater PAHs include Benzo(a)anthracene, Benzo(a)pyrene, Benzo(b)fluoranthene, Benzo(k)fluoranthene, Chrysene, Dibenzo(a,h)anthracene, Fluoranthene, Indeno(1,2,3-cd)pyrene, Naphthalene, and Pyrene Trip Blanks Holding Time from Sample Date Preservation (Cool All Samples to 4° ± 2°C Unless 'None' Indicated) Container Type Minimum Volume Field Duplicates1 (1 extra volume) Sample Type Proposed Number of Samples Parameter Method MS/MSD2 (2 extra volumes) Soil 12-26 Proposed Number of Locations 6 Soil Borings (SB-329 - SB-334) 7 Contingency Soil Boring (SB-335 - SB-341) 1 Temporary Monitoring Well (TW-332) 1 Contingency Temporary Monitoring Well (Location to be determined) 1 Surface Water Sample 1 Sheen Sample (if present) (SW-01-2025) Groundwater 1-2 Surface Water and Sheen Sample 1 -2 Table 3 - Sampling and Analysis Plan.xlsx 1 of 1 Page 20 of 35 FIGURES Page 21 of 35 SITE LOCATION MAP DATED: 5/7/2024 | DESIGNER: egreaves PROPERTY BOUNDARY FIGURE 1 RAMBOLL AMERICAS ENGINEERING SOLUTIONS, INC. A RAMBOLL COMPANY Service Layer Credits: USA_Topo_Maps: Copyright:© 2013 National Geographic Society, i-cubed 0 2,0001,000 Feet !( ! á(N ADDITIONAL STUDIES WORK PLAN FORMER MANUFACTURED GAS PLANT WISCONSIN PUBLIC SERVICE CORPORATION STEVENS POINT, WISCONSIN Y:\GIS\Projects\11\1177\MXD\2024.aprx Iowa Minnesota Illinois Michigan Wisconsin Map Scale: 1:1:24,000; Map Center: 89°35'17"W 44°31'30"N KEY MAP t s t Page 22 of 35 SITE LAYOUT !A #0 "D "D "D"D "D "D"D "D "D"D "D "D"D "D"D "D"D "D"D "D "D"D "D"D "D"D "D "D "D "D "D "D "D 1ST ST W 3RD ST WI-66 N WATER ST MAIN ST PORTAGE ST W CLARK ST CROSBY AVE OW23 OW22 OW20OW19 OW18 OW17 OW16 OW15 OW14 OW12 OW11 OW10 OW09 OW08 OW06 OW04 OW02 OW01 PZ16B PZ15B PZ14B PZ13B PZ12B PZ11B PZ10B PZ09B PZ07B OW07A PZ05B OW05R PZ03B OW03R OW24 SG02 OW21 "D MONITORING WELL LOCATION #0 STAFF GAUGE LOCATION !A ABANDONED MONITORING WELL LOCATION GROUNDWATER INSTITUTIONAL CONTROLS AREA FORMER SLOUGH SOIL INSTITUTIONAL CONTROLS AREA PROPERTY BOUNDARY RIVER FIGURE 2 RAMBOLL AMERICAS ENGINEERING SOLUTIONS, INC. A RAMBOLL COMPANY Service Layer Credits: World Imagery: Maxar, Microsoft 0 18090 Feet LAST SAVE: 11:19 AM !( ! á ( N PROJECT: 1940105129 | DATED: 9/19/2025 | DESIGNER: PWYSIATKO Y:\GIS\Projects\11\1177\MXD\2025_AdditionalStudiesWorkPlan\FormerGasPlant_StevensPoint.aprx FORMER MANUFACTURED GAS PLANT WISCONSIN PUBLIC SERVICE CORPORATION STEVENS POINT, WISCONSIN WISCONSIN RIVER Page 23 of 35 PROPOSED SOIL BORING AND TEMPORARY WELL LOCATIONS "D "D"D "D "D "D "D @A @A @A @A @A @A @A @A @A @A @A @A @A @A @A @A @A @A @A @A @A @A @A @A LEU LEU LEU LEU LEU LEU LEU LEU LEU LEU LEU LEU LEU LEU LEU LEU LEU LEU OF OF OF OF OF OF OF OF "D &< &< &< &< &< &< &< @A @A @A @A @A "D @A @A @A @A @A @A @A @A Crosby Ave Crosby Ave Crosby Ave Crosby Ave CULTURAL COMMONS RAIN GARDEN POND OW02 OW16 PZ16B SB11 SB13 SB15 SB17 SB14 SB20 SB5/TW5 SB16 SB9 SB21 SB6 SB4 SB3 SB7/TW7 SB18 SB19 SB2 SB22 SB26 SB10 SB23 SB24 SB25 SB1/TW1 SB12 SB-101 SB-102 SB8/TW8 SB-327 SB-328 SB-322 SB-323 SB-324 SB-325 SB-326 OW24 SB-335 SB-337 SB-336 SB-341 SB-340 SB-338 SB-339 SW-01-2025 SB-333 SB-334 SB-331 SB-330 SB-329 SB/TW-332 PROPERTY BOUNDARY SOIL INSTITUTIONAL CONTROLS AREA FORMER SLOUGH RIVER @A PROPOSED SOIL BORING LOCATION "D PROPOSED SOIL BORING/TEMPORARY WELL LOCATION @A PROPOSED CONTINGENCY BORING LOCATION @A PROPOSED SURFACE WATER SAMPLE LOCATION "D MONITORING WELL LOCATION - INSTALLED SEPTEMBER 2024 &< SOIL BORING - INSTALLED SEPTEMBER 2024 "D EXISTING MONITORING WELL LOCATION "D SOIL BORING AND TEMPORARY WELL (PFIFFNER PIONEER PARK WATER GARDEN ERP CASE 02-50-586876) @A SOIL BORING (PFIFFNER PIONEER PARK WATER GARDEN ERP CASE 02-50-586876) LEU ELECTRICAL LINE OF FIBER OPTIC FIGURE 3 RAMBOLL AMERICAS ENGINEERING SOLUTIONS, INC. A RAMBOLL COMPANY Service Layer Credits: Wisconsin Leaf-Off Digital Orthophotography: 0 3015 Feet LAST SAVE: 11:19 AM !( ! á ( N PROJECT: 1940105129 | DATED: 9/19/2025 | DESIGNER: PWYSIATKO Y:\GIS\Projects\11\1177\MXD\2025_AdditionalStudiesWorkPlan\FormerGasPlant_StevensPoint.aprx ADDITIONAL STUDIES WORK PLAN FORMER MANUFACTURED GAS PLANT WISCONSIN PUBLIC SERVICE CORPORATION STEVENS POINT, WISCONSIN WISCONSIN RIVER Page 24 of 35 ATTACHMENT 1 STANTEC BORING LOG SB5 AND TABLES 2B, 2C, 3A, 3B, AND 3C Page 25 of 35 Page 26 of 35 1,1,2-Trichloroethane 1,1-Dichloroethane 1,2,4-Trimethyl benzene 1,3,5-Trimethyl benzene 1,2-Dichloroethane Benzene Bromobenzene Bromomethane Chloroform Ethylbenzene Isopropylbenzene Methyl tert-butyl ether (MTBE) Methylene chloride n-Butylbenzene Naphthalene n-Propylbenzene p-Isopropyltoluene sec-Butylbenzene Tetrachloroethene (PCE) Toluene Trichloroethene (TCE) Vinyl Chloride Total Xylenes Non-Industrial 1,590 5,060 219,000 182,000 652 1,600 342,000 9,600 454 8,020 NE 63,800 61,800 108,000 5,520 NE 162,000 145,000 33,000 818,000 1,300 67 260,000 Industrial 7,010 22,200 219,000 182,000 2,870 7,070 679,000 43,000 1,980 35,400 NE 282,000 1,150,000 108,000 24,100 NE 162,000 145,000 145,000 818,000 8,410 2,080 260,000 3.2 483.4 2.8 5.1 NE 5.1 3.3 1,570 NE 27 2.6 NE 658.2 NE NE NE 4.5 1,107.2 3.6 0.1 3,960 B1 SB1 (0-2) 5/5/2021 0-2 Loamy sand w/ trace coal frags to medium sand 2.6 <22 <26 <22 <24 <24 14 J <22 <27 <23 <11 <24 <25 <100 <24 71 <26 <23 <25 <23 40 <10 <16 51 B2 SB2 (0-2) 5/5/2021 0-2 Sandy topsoil to medium sand 2 <19 <22 26 J <21 <21 16 <19 <43 <20 12 J <21 <22 <89 <21 150 <23 <20 <22 <20 63 <8.9 <14 97 SB3 (0-2) 5/5/2021 0-2 Sandy topsoil to medium sand w/ trace gravel 1.6 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- SB3 (2-4) 5/5/2021 2-4 medium sand w/ gravel w/ fine coal frags 0.9 <26 <31 <27 <29 <29 <11 <27 <60 <28 <14 <29 <30 <120 <29 <25 <31 <27 <30 <28 <11 <12 <20 <17 SB4 (0-2) 5/5/2021 0-2 Sandy topsoil to fine sand 1.4 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- SB4 (2-4) 5/5/2021 2-4 Fine sand to medium sand w/ fine coal frags 2.1 <21 <24 83 <22 <23 68 <21 <25 <22 73 <23 <23 <96 <23 280 49 J <21 <23 <22 350 <9.6 <15 410 SB5 (0-2) 5/5/2021 0-2 Sandy topsoil to medium sand 1 <21 <25 <22 <23 <24 <8.9 <22 <48 <22 <11 <23 <24 <99 <24 23 J <25 <22 <24 <22 <8.9 <10 <16 <13 SB5 (6-8) 5/5/2021 6-8 Sand w/ black tar binding, sticky, to wood chips 46.2 <290 <340 20,000 9,000 <330 <120 <300 <670 <310 1,300 1,800 <330 <1400 <320 1,100,000 610 J 2,600 <330 <310 430 <140 <220 3,300 B6 SB6 (0-2) 5/5/2021 0-2 Medium sand w/ loamy layers 2.6 <24 <28 <24 <26 <27 <9.9 <24 <54 <25 <12 <26 <27 <110 <26 <23 <28 <25 <27 <25 <10 <11 <18 <15 B7 SB7 (0-2) 5/5/2021 0-2 Loamy topsoil to sand w/ slag and coal 1.3 <25 <29 60 J <27 <28 36 <25 <56 <26 45 <27 <28 <120 <27 120 30 J <26 <28 <26 170 <12 <18 250 B8 SB8 (0-2) 5/5/2021 0-2 Loamy topsoil to medium sand w/ slag and coal 0.6 <23 <27 <24 <25 <26 <9.7 <24 <53 <24 <12 <25 <26 <110 <26 <22 <27 <24 <26 <24 <9.7 <11 <17 <15 B9 SB9 (0-1) 5/5/2021 0-1 Sandy topsoil to medium sand 1 <20 <24 <21 <22 <23 <8.5 <21 <46 <21 <11 <22 <23 <94 <22 32 J <24 <21 <23 <21 <8.5 <9.5 <15 <13 B10 SB10 (0-1.5) 5/5/2021 0-1.5 Sandy topsoil to medium sand 0.8 <20 <23 <20 <22 <22 19 <20 <45 <21 <10 <22 <22 <93 <22 340 <24 <21 <23 <21 49 <9.3 <15 44 Key: < x = compound not detected to a detection limit of x µg/kg = micrograms per kilogram --- = not analyzed NE = not established by Wisconsin Administrative Code (Wis. Adm. Code) or WDNR Soil RCL Summary Table XXX =exceeds WDNR RCL for direct contact risk (Non-Industrial) XXX = exceeds WDNR RCL for direct contact risk (Industrial) ** = sample collected below the observed low water table XXX = exceeds WDNR RCL for protection of groundwater "J" = analyte detected between limit of detection and limit of quantification RCL = residual contaminant level iui = Instruments Units of Isobutylene "B" = analyte detected in laboratory blank and sample Notes: 1. WDNR soil RCL Summary table (December 2018) used to establish RCLs for groundwater protection and direct contact. 2. No VOCs detected above limits of dtection in Trip Blank accompanying soil VOC samples. WDNR RCL for Groundwater Protection 1378.7 combined B3 B4 B5 WDNR Direct Contact RCL Table 2b - Soil Analytical Results, Volatile Organic Compounds, Pfiffner Pioneer Park, 1200 Crosby Avenue, Stevens Point, Wisconsin Borehole Number Sample Number Date Depth (feet below grade) Soil Description PID Response (iui) Detected Volatile Organic Compound Laboratory Result (µg/kg) Page 27 of 35 Sample Number Date Collected Depth (fbg) Soil Description Acenaphthene Acenaphthylene Anthracene Benzo(a) anthracene Benzo(a)pyrene Benzo(b) fluoranthene Benzo(g,h,i) perylene Benzo(k) fluoranthene Chrysene Dibenzo(a,h) anthrancene Fluoranthene Fluorene Indeno(1,2,3- cd)pyrene 1-Methyl naphthalene 2-Methyl naphthalene Naphthalene Phenanthrene Pyrene Non-Industrial 3,590 NE 17,900 1.14 0.115 1.15 NE 11.5 115 0.115 2,390 2,390 1.15 17.6 239 5.52 NE 1,790 Industrial 45,200 NE 100,000 20.8 2.11 21.1 NE 211 2,110 2.11 30,100 30,100 21.1 72.7 3,010 24.1 NE 22,600 NE NE 196.9 NE 0.47 0.478 NE NE 0.144 NE 88.877 14.829 NE NE NE 0.658 NE 54.545 B1 SB1 (0-2) 5/5/2021 0-2 Loamy sand w/ trace coal frags to medium sand 0.22 1 0.64 4.5 6.9 8.7 2.9 3.3 5.9 0.74 7.6 0.15 J 2.6 0.190 J 0.081 J 0.24 2.3 11 B2 SB2 (0-2) 5/5/2021 0-2 Sandy topsoil to medium sand 0.18 0.48 0.31 2.6 2.7 2.5 1.4 1.5 2.6 0.39 4.1 0.087 J 1.4 0.29 J 0.32 J 0.36 0.86 5.2 SB3 (0-2) 5/5/2021 0-2 Sandy topsoil to medium sand w/ trace gravel 1.9 12 20 48 61 76 19 21 47 5.9 50 1.5 J 19 1.7 J 0.73 J 3.4 6.2 63 SB3 (2-4) 5/5/2021 2-4 medium sand w/ gravel w/ fine coal frags 0.31 J 2.3 1.9 9.2 10 14 3.4 5 8.6 0.8 18 0.37 J 2.8 0.23 J 0.28 J 0.67 5.1 15 SB4 (0-2) 5/5/2021 0-2 Sandy topsoil to fine sand <0.033 0.32 0.19 1.2 1.6 2.1 0.44 0.69 1.2 0.13 J 2 0.053 J 0.43 <0.044 0.036 J 0.10 J 0.46 2 SB4 (2-4) 5/5/2021 2-4 Fine sand to medium sand w/ fine coal frags 0.26 J 3.7 3.3 17 20 28 5.7 8.7 17 1.7 37 0.71 5.5 1.1 J 1.6 2.2 12 31 SB5 (0-2) 5/5/2021 0-2 Sandy topsoil to medium sand <0.032 0.25 0.11 J 1.2 1.7 2.3 0.55 0.93 1.3 0.15 J 1.8 <0.025 0.51 <0.043 0.045 J 0.15 J 0.22 1.9 SB5 (6-8) 5/5/2021 6-8 Sand w/ black tar binding, sticky, to wood chips 520 35 400 230 240 300 46 110 190 16 770 380 48 240 430 1100 1300 690 B6 SB6 (0-2) 5/5/2021 0-2 Medium sand w/ loamy layers 0.099 0.074 0.24 0.58 0.65 1 0.2 0.26 0.56 0.059 1.3 0.11 0.18 0.042 J 0.048 J 0.14 0.9 1 B7 SB7 (0-2) 5/5/2021 0-2 Loamy topsoil to sand w/ slag and coal 0.023 J 0.17 0.082 0.6 0.9 1.4 0.32 0.4 0.63 0.071 1.1 0.026 J 0.27 0.25 0.33 0.24 0.41 1.5 B8 SB8 (0-2) 5/5/2021 0-2 Loamy topsoil to medium sand w/ slag and coal 0.22 1.4 0.71 5.8 9.6 12 2.7 4.5 6.1 0.74 7.3 0.15 J 2.5 0.26 J 0.20 J 0.57 1.3 12 B9 SB9 (0-1) 5/5/2021 0-1 Sandy topsoil to medium sand 0.010 J 0.16 0.069 0.69 0.94 1.3 0.26 0.33 0.65 0.084 1.1 0.013 J 0.25 0.013 J 0.024 J 0.069 0.13 1.2 B10 SB10 (0-1.5) 5/5/2021 0-1.5 Sandy topsoil to medium sand <0.32 4.2 2.1 19 28 32 8.2 13 18 2.4 29 0.39 J 7.7 <0.43 0.39 J 1.7 2.9 30 Key: <x = compound not detected to a detection limit of x "J" = analyte detected between the limit of detection and limit of quantification --- = not laboratory analyzed iui = instrument units as isobutylene XXX = exceeds WDNR RCL for direct contact risk (Non-Industrial) PID = photoionization detecto r XXX = exceeds WDNR RCL for direct contact risk (Industrial) RCL = residual contaminant level XXX = exceeds WDNR RCL for protection of groundwater and/or BTV NE = not established by WAC (Wis. Adm. Code) or WDNR Soil RCL Summary Table Notes: WDNR soil RCL Summary table (December 2018) used to establish RCLs for groundwater protection and direct contact. B3 B4 B5 Table 2c - Soil Analytical Results, Polynuclear Aromatic Hydrocarbons, Pfiffner Pioneer Park, 1200 Crosby Avenue, Stevens Point, Wisconsin PAH Compound Laboratory Result (milligram/kilogram) Boring Number WDNR RCL for Protection of Groundwater WDNR RCL for Protection from Direct Contact Risk Page 28 of 35 Arsenic Lead 1 1.5 10 15 TW1 5/5/2021 <0.23 0.40 J TW5 5/5/2021 1.3 1.1 TW7 5/5/2021 1.1 1.3 TW8 5/5/2021 1.1 0.6 Key: RCRA = Resource Conservation and Recovery Act <X = analyte not detected above method detection limit "J" = analyte detected between limit of detection and limit of quantitation X X = concentration detected above NR 140, Wis. Adm. Code enforcement standard (ES) NE = not established --- = not analyzed Table 3a Groundwater Analytical Results, RCRA Metals, Pfiffner Pioneer Park, 1200 Crosby Avenue, Stevens Point, WI = concentration detected above Chapter NR 140, Wisconsin Administrative Code(NR 140, Wis. Adm. Code) preventive action limit (PAL) Well Number Date Collected NR 140 Preventive Action Limit (µg/l) NR 140 Enforcement Standard (µg/l) Laboratory Results (μg/L) RCRA Metals Page 29 of 35 Benzene Isopropylbenzene n-Butylbenzene n-Propylbenzene sec-Butylbenzene 1,2-Dichloroethane cis-1,2-Dichloroethene trans-1,2-Dichloroethene Ethylbenzene p-Isopropyltoluene Methylene Chloride MTBE Naphthalene Tetrachloroethene (PCE) Toluene Trichloroethene (TCE) Total Trimethylbenzene Vinyl Chloride Total Xylenes 0.5 NE NE NE NE 0.5 7 20 140 NE 0.5 12 10 0.5 160 0.5 96 0.02 400 5 NE NE NE NE 5 70 100 700 NE 5 60 100 5 800 5 480 0.2 2,000 TW1 5/5/2021 <0.15 <0.39 <0.39 <0.41 <0.40 <0.39 <0.41 <0.35 <0.18 <0.36 <1.6 <0.39 <0.34 <0.37 <0.15 <0.16 <0.61 <0.20 <0.22 TW5 5/5/2021 <0.29 <0.77 <0.78 <0.83 <0.80 <0.78 <0.82 <0.70 0.98 J 61 <3.3 <0.79 1100 <0.74 <0.30 <0.33 13.2 <0.41 1.3 J TW7 5/5/2021 <0.15 <0.39 <0.39 <0.41 <0.40 <0.39 <0.41 <0.35 <0.18 <0.36 <1.6 <0.39 <0.34 <0.37 <0.15 <0.16 <0.61 <0.20 <0.22 TW8 5/5/2021 <0.15 <0.39 <0.39 <0.41 <0.40 <0.39 <0.41 <0.35 <0.18 <0.36 <1.6 <0.39 <0.34 <0.37 <0.15 <0.16 <0.61 <0.20 <0.22 DUP 5/5/2021 <0.29 <0.77 <0.78 <0.83 <0.80 <0.78 <0.82 <0.70 1.4 78 <3.3 <0.79 1200 <0.74 0.43 J <0.33 14.7 <0.41 1.3 J Key: "J" = Analyte detected between Limit of Detection and Limit of Quantitation X = Concentration detected above Chapter NR 140, Wisconsin Administrative Code (NR 140, Wis. Adm. Code) preventive action limit (PAL) X = Concentration detected above NR 140, Wis. Adm. Code enforcement standard (ES) μg/L = micrograms per liter Notes: 1. No VOCs detected above limits of dtection in Trip Blank accompanying groundwater VOC samples. Table 3b Groundwater Analytical Results, Volatile Organic Compound, Pfiffner Pioneer Park, 1200 Crosby Avenue, Stevens Point, WI NR 140 Preventive Action Limit (µg/l) NR 140 Enforcement Standard (µg/l) Date CollectedWell Number Volatile Organic Compounds (μg/L) Page 30 of 35 Acenaphthene Acenaphthylene Anthracene Benzo(a)anthracene Benzo(a)pyrene Benzo(b)fluoranthene Benzo(g, h, i)perylene Benzo(k)fluoranthene Chrysene Dibenzo(a, h)anthracene Fluoranthene Fluorene Indeno(1,2,3-cd)pyrene 1-Methyl naphthalene 2-Methyl naphthalene Naphthalene Phenanthrene Pyrene NE NE 600 NE 0.02 0.02 NE NE 0.02 NE 80 80 NE NE NE 10 NE 50 NE NE 3,000 NE 0.2 0.2 NE NE 0.2 NE 400 400 NE NE NE 100 NE 250 TW1 5/5/2021 7.3 1.3 1.4 5.2 6 7.2 1.5 3 4.7 0.48 9.4 2.7 1.8 0.38 J 0.32 J 1.1 3.8 9.5 TW5 5/5/2021 130 2 11 5.2 5.5 6.3 1.3 2.2 4.6 0.4 14 36 1.5 94 130 1100 43 12 TW7 5/5/2021 2 <0.21 <0.26 0.072 J <0.076 <0.062 <0.29 <0.049 <0.052 <0.039 0.35 J 0.97 <0.057 <0.23 0.056 J 0.32 J 0.54 J <0.33 TW8 5/5/2021 0.23 J <0.20 <0.25 0.35 0.45 0.49 <0.28 0.19 0.28 <0.038 0.39 J <0.18 <0.057 <0.23 0.084 J 0.46 J <0.23 0.47 J DUP 5/5/2021 130 1.9 11 4.4 4.5 5.4 1.2 2.6 4 0.24 13 41 1.3 99 140 1100 47 11 Key: "J" = Analyte detected between Limit of Detection and Limit of Quantitation X = Concentration detected above Chapter NR 140, Wisconsin Administrative Code (NR 140, Wis. Adm. Code) preventive action limit (PAL) X = Concentration detected above NR 140, Wis. Adm. Code enforcement standard (ES) μg/L = micrograms per liter Table 3c Groundwater Analytical Results, Polynuclear Aromatic Hydrocarbons, Pfiffner Pioneer Park, 1200 Crosby Avenue, Stevens Point, WI NR 140 Preventive Action Limit (µg/l) NR 140 Enforcement Standard (µg/l) Well Number Date Collected Polynuclear Aromatic Hydrocarbons (μg/L) Page 31 of 35 ATTACHMENT 2 SAMPLING AND ANALYSIS PLAN SUMMARY AND SUMMARY REQUIRED ANALYTES BASED ON PURPOSE Page 32 of 35 Table 8. Sampling and Analysis Plan Summary Wisconsin Public Service - Former Stevens Point Manufactured Gas Plant Site 1111 Crosby Avenue, Stevens Point, Wisconsin USEPA WIN000509983 / BRRTS # 02-50-000079 / FID # 750081200 Sample Type/Location Matrix / Laboratory Parameter Method Sample Quantity Field Duplicates 2 Equipment Blanks 3 MS/MSD 4 TOTAL Container Type Minimum Volume Preservation (Cool to 4° ≥ 2°C All Samples) Holding Time from Sample Date Soil - Pond Area Soil PVOCs 8021 or 8260B up to 91 1 0 1 up to 11 glass 4 oz. methanol 14/40 days (Source area and Fixed PAHs 8270C or 8270-SIM up to 91 1 0 1 up to 11 amber glass 8 oz. 14/40 days vertical migration) Metals9 6020A or 7471A up to 91 1 0 1 up to 11 plastic 125 mL 28 days (Hg) Cyanide 9012A up to 91 1 0 1 up to 11 plastic 125 mL 14 days Phenols10 8270C up to 91 1 0 1 up to 11 amber glass 8 oz. 14/40 days Soil - Pioneer Park Soil PVOCs 8021 or 8260B 6 1 0 1 8 glass 4 oz. methanol 14/40 days (Surface Soils [0'-2']) Fixed PAHs 8270C or 8270-SIM 6 1 0 1 8 amber glass 8 oz. 14/40 days Soil - City Parking Lot Soil PVOCs 8021 or 8260B 8 1 0 1 10 glass 4 oz. methanol 14/40 days (Shallow Subsurface Soils [2'-6']) Fixed PAHs 8270C or 8270-SIM 8 1 0 1 10 amber glass 8 oz. 14/40 days Groundwater Water Benzene 8021 or 8260B 20 2 0 1 23 glass vial 2-40 ml HCl to pH<2, Zero Headspace 14 days First Quarter Fixed PAHs 8270C or 8270-SIM 20 2 0 1 23 amber glass 1 L 14 days (Risk Assessment, Feasibility Alkalinity EPA 310.2 20 2 0 1 23 plastic 100 ml 14 days Study, On-going monitoring) Nitrate+Nitrite EPA 300.0 20 2 0 1 23 plastic 100 ml H2SO4 to pH<2 48 hours Sulfate EPA 300.0 20 2 0 1 23 plastic 50 ml Cool to 4° ≥ 2°C 28 days Iron (dissolved) 6010 20 2 0 1 23 plastic 250 ml HNO3 to pH <2 6 months Methane 8015 20 2 0 1 23 glass vial 2-40 ml HCl to pH<2, Zero Headspace 14 days Field Parameters12 Field 20 2 0 0 22 field measured Groundwater Water Benzene 8021 or 8260B 28 3 0 2 33 glass vial 2-40 ml HCl to pH<2, Zero Headspace 14 days Quarters 2-4 Fixed PAHs 8270C or 8270-SIM 28 3 0 2 33 amber glass 1 L 14 days (Risk Assessment, Feasibility Alkalinity - Only Oct. 2007 EPA 310.2 28 3 0 2 33 plastic 100 ml 14 days Study, On-going monitoring) Nitrate+Nitrite - Only Oct. 2007 EPA 353.3 28 3 0 2 33 plastic 100 ml H2SO4 to pH<2 48 hours Sulfate - Only Oct. 2007 EPA 300.0 28 3 0 2 33 plastic 50 ml Cool to 4° ≥ 2°C 28 days Iron (dissolved) - Only Oct. 2007 6010 28 3 0 2 33 plastic 250 ml HNO3 to pH <2 6 months Methane - Only Oct. 2007 8015 28 3 0 2 33 glass vial 2-40 ml HCl to pH<2, Zero Headspace 14 days Field Parameters12 Field 28 3 0 0 31 field measured Storm Water Water PAHs 8270C or 8270-SIM 4 1 0 0 5 amber glass 1 L 14 days 3 Quarters Fixed PVOCs 8021 or 8260B 4 1 0 0 5 glass vial 2-40 ml HCl to pH<2, Zero Headspace 14 days River Surface Water Water PVOCs 8021 or 8260B 9 1 0 1 11 glass vial 2-40 ml HCl to pH<2, Zero Headspace 14 days (Human Health and Ecological Fixed PAHs 8270C or 8270-SIM 9 1 0 1 11 amber glass 1 L 14 days Risk Assessment) Metals9 6010 or 7470 9 1 0 1 11 plastic 500 ml HNO3 to pH <2 28 days Cyanide OIA-1677 9 1 0 1 11 amber glass 500 ml PbCO3; NaOH to pH>12 14 days Phenols10 8270C 9 1 0 1 11 amber glass 1 L 14 days Field Parameters12 Field 9 0 0 0 9 field measured River Sediment Sediment PVOCs 8021 or 8260B 20 cores8 TBD TBD TBD TBD Glass 4 oz. methanol 7/28 days (Human Health and Ecological Mobile 34 PAHs5 8270C or 8270-SIM 20 cores8 TBD TBD TBD TBD amber glass 8 oz. 14/40 days Risk Assessment) Metals11 6020A or 7471A 20 cores8 TBD TBD TBD TBD plastic 125 mL 6 months Phenols10 8270C 20 cores8 TBD TBD TBD TBD amber glass 8 oz. 14/40 days Percent Solids Various 20 cores8 TBD TBD TBD TBD Glass 4 oz keep in dark 28 days Fixed Cyanide 9012A 20 cores8 TBD TBD TBD TBD plastic 125 mL 14 days "Soot" Carbon13 Refer to Note 6 20 cores8 TBD TBD TBD TBD Plastic 500 g keep in dark 28 days Total Organic Carbon13 Various 20 cores8 TBD TBD TBD TBD plastic 100 g keep in dark 28 days Biological Testing13 Refer to Note 7 20 cores8 TBD TBD TBD TBD Plastic 2L keep in dark 1177_SSWP Sample_Summ 070420.xls - All Page 1 of 2 Natural Resource Technology, Inc. Page 33 of 35 Table 8. Sampling and Analysis Plan Summary Wisconsin Public Service - Former Stevens Point Manufactured Gas Plant Site 1111 Crosby Avenue, Stevens Point, Wisconsin USEPA WIN000509983 / BRRTS # 02-50-000079 / FID # 750081200 Sample Type/Location Matrix / Laboratory Parameter Method Sample Quantity Field Duplicates 2 Equipment Blanks 3 MS/MSD 4 TOTAL Container Type Minimum Volume Preservation (Cool to 4° ≥ 2°C All Samples) Holding Time from Sample Date Pond Surface Water Water PVOCs 8021 or 8260B 1 0 0 0 1 glass vial 2-40 ml HCl to pH<2, Zero Headspace 14 days (Human Health and Ecological Fixed PAHs 8270C or 8270-SIM 1 0 0 0 1 amber glass 1 L 14 days Risk Assessment) Metals9 6010 or 7470 1 0 0 0 1 plastic 500 ml HNO3 to pH <2 28 days Cyanide OIA-1677 1 0 0 0 1 amber glass 500 ml PbCO3; NaOH to pH>12 14 days Phenols10 8270C 1 0 0 0 1 amber glass 1 L 14 days Field Parameters12 Field 1 0 0 0 1 field measured Pond Sediment Sediment PVOCs 8021 or 8260B 3 cores8 TBD TBD TBD TBD Glass 4 oz. methanol 7/28 days (Human Health and Ecological Mobile 34 PAHs5 8270C or 8270-SIM 3 cores8 TBD TBD TBD TBD amber glass 8 oz. 14/40 days Risk Assessment) Metals11 6020A or 7471A 3 cores8 TBD TBD TBD TBD plastic 125 mL 6 months Phenols10 8270C 3 cores8 TBD TBD TBD TBD amber glass 8 oz. 14/40 days Percent Solids Various 3 cores8 TBD TBD TBD TBD Glass 4 oz keep in dark 28 days Sediment Soil Grain Size Distribution ASTM D421, 422 6 0 0 0 6 5 gal bucket 5 gal. (FS Parameters) Fixed Atterberg Limits ASTM D4318 6 0 0 0 6 Glass or Plastic 8 oz. Organic Content ASTM D2974 6 0 0 0 6 plastic 100 g keep in dark 28 days Moisture Content ASTM D2216 6 0 0 0 6 Glass or Plastic 8 oz. Notes: 1. Actual number of soil samples collected dependent on recovery and impacts observed. Number of QC samples collected is based on an estimate of 9 samples, numbers will change according to footnote 2 depending on actual number of analytical samples. 2. Field duplicates will be collected at a frequency of one per group of ten or fewer investigative water samples and one per group of twenty or fewer investigative soil/sediment samples. 3. Equipment blanks will be collected at a frequency of one per sampling day with non-dedicated sampling equipment. 4. Matrix Spike/Matrix Spike Duplicate (MS/MSD) samples will be collected at a frequency of one per group of twenty or fewer investigative samples. Additional volume will be determined per laboratory requirements. 5. May include a list of 34 PAHs, including chain parameters as provided in USEPA Guidance Procedures for the Derivation of Equilibrium Partitioning Sediment Benchmarks (ESBs) for the Protection of Benthic Organisms: PAH Mixtures, 2002 by SW-846 Method 8270C with gas chromatograph/mass spectrometry in selected ion mode of operation. 6. "Soot" Carbon is the remaining carbon after muffle furnace drying and acid treatment of sediments to remove other forms of carbon. Used to estimate the bioavailable concentration of PAHs in sediment from the "freely-dissolved" chemical in the interstitial water based on USEPA Bioavailability Procedure, 2000, Gustafsson, et al. 1997, and Accardi-Day and Gschwend, 2003. 7. The Hyalella (amphipod) 28-day test may be used to evaluate the toxicity of whole sediments. This test will be performed in accordance with USEPA guidance. 8. Additional sediment cores may be collected based on mobile laboratory analytical results as described in Sections 6.7/6.8 of the Site Specific Work Plan. Sediment cores will be subdivided into 0-6 inch, 6-18 inch, 18-30 inch, 30-42 inch, and so on in one foot intervals as described in Section 6.7 of the Site Specific Work Plan. Field duplicates, equipment blanks and MS/MSD samples will be collected as described above. Final sample numbers will be determined based on field conditions. 9. Metals include aluminum, antimony, arsenic, barium, cadmium, chromium, copper, iron, lead, manganese, mercury, nickel, selenium, silver, vanadium and zinc. 10. Phenols include 2,4-dimethylphenol, 2-methylphenol, 4-methylphenol and phenol. 11. Metals for sediment include aluminum, antimony, arsenic, barium, chromium, iron, manganese, nickel, selenium, silver and vanadium. 12. Field parameters include temperature, pH, specific conductivity, oxidation-reduction potential, and dissolved oxygen. 13. These parameters may be analyzed as part of additional Step 1 assessment sampling. Acronyms: TBD = To be determined based on field encountered conditions BTEX = Benzene, Toluene, Ethylbenzene, Xylenes PVOC = Petroleum Volatile Organic Compounds PAHs = Polynuclear Aromatic Hydrocarbons VOC = Volatile Organic Compounds 1177_SSWP Sample_Summ 070420.xls - All Page 2 of 2 Natural Resource Technology, Inc. Page 34 of 35 Table 2. Summary Required Analytes Based on Purpose Natural Attenuation Implementation and Monitoring Plan (Modified) Wisconsin Public Service - Former Stevens Point Manufactured Gas Plant Site 1111 Crosby Avenue, Stevens Point, Wisconsin USEPA WIN000509983 / BRRTS # 02-50-000079 / FID # 750081200 Analytes Analytical  Method Lateral Plume Definition Vertical Plume Definition Inside/Outside Plume MNA Monitoring Plume Concentration Trends GW to Vapor Groundwater Flow Benzene  8021 or 8260B XX X X Benzo[a]anthracene  XX X Benzo[a]pyrene  XX X Benzo[b]fluoranthene XX X Benzo[k]fluoranthene  XX X Chrysene XX X Dibenz[a,h]anthracene  XX X Fluoranthene  XX X Indeno[I,2,3‐cd]pyrene  XX X Naphthalene XX X X Pyrene XX X Iron, Dissolved 6010 XX X X Iron, Total 6010 XX X X Manganese, Dissolved 6010 X Alkalinity, Total 310.2 X NO3 + NO2, Total 300 X Sulfate, Total 300 X Methane 8015B X Field Parameters Field XX X X X Groundwater Elevation Field X Analyte list originates from clean up levels identified in the ROD Field Parameters: Temperature, Dissolved Oxygen, Oxidation‐Reduction  Potential, pH, Specific Conductance, Turbidity The potential vapor risk will be assessed as described in Section 5.5 of the NAIMP 8270‐SIM Table 2 1 of 1 Page 35 of 35

Source: City of Stevens Point website. First collected Nov 6, 2026.