Special Common Council — Agenda Packet
City of Stevens Point · Portage County · Common Council · meeting of Oct 15, 2025 · Agenda packets
Open the original document More from City of Stevens Point
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Our intention is to have in-person meetings going forward. For the time being, we will hold the City Committee Meetings, Plan
Commission, Council and most others at the Community Room at 933 Michigan Avenue. This in-person location will meet the legal
requirement for our open meetings.
We will have a virtual option available, but the technology for the hybrid style meeting may not be reliable all of the time.
CITY OF STEVENS POINT
SPECIAL COUNCIL MEETING
Community Room
933 Michigan Avenue, Stevens Point, WI
OR
Zoom Teleconferencing
Meeting ID: 885 3196 7761 | Passcode:716657
By Computer: Zoom Link
By Phone: +1-312-626-6799 (US Chicago)
October 15, 2025
7:45 PM
AGENDA
Minutes
1. Roll Call.
Consideration and Possible Action on the Following:
2. To award the Plover River Crossing Project to Highway Landscapers, Inc. in the amount of
$1,796,643.43.
3. Adjournment.
RMC – Revised Municipal Code
Persons who wish to address the Common Council may make a statement as long as it pertains to a specific agenda item. Persons
who wish to speak on an agenda item will be limited to a five (5) minute presentation. Any person who wishes to address the
Common Council on a matter which is not on the agenda will be given a maximum of three (3) minutes and the time strictly
enforced under the item, “Persons who wish to address the mayor and council on non-agenda items.” Individuals should not expect
to engage in discussion with members of the City Council and City staff.
Any person who has special needs while attending this meeting or needing agenda materials for this meeting should contact the City
Clerk as soon as possible to ensure a reasonable accommodation can be made. The City Clerk can be reached by telephone at (715)
346-1569 or by mail at 1515 Strongs Avenue, Stevens Point, WI 54481.
Copies of ordinances, resolutions, reports and minutes of the committee meetings are on file at the office of the City Clerk for
inspection during the regular business hours from 7:30 A.M. to 4:00 P.M.
Page 1 of 5
City of Stevens Point
2442 Sims Avenue
Stevens Point, WI 54481-3594
Memo
TO: Park Commission, Finance Committee and Common Council
FROM: Dan Kremer, Director of Parks, Recreation, Forestry
DATE: September 25, 2025
RE: Approval of Plover River Crossing Project contract
Bids were solicited and opened on Tuesday, September 16, 2025 for the Plover River Crossing Trail
Project. The city and the Friends of the Plover River Crossing acquired a Federal Transportation
Alternatives Program Grant for this project that totals $1,819,000. Within that grant amount, up to
80% ($1,455,200) is grant reimbursable and the remaining 20% local match ($363,000) has been
met through fundraising efforts.
A total of seven (7) bids were received on the project, and the low, qualified bid was received
from Highway Landscapers, Inc. in the amount of $1,796,643.43. The bids have been reviewed by
city staff, Rettler Corporation and the Wisconsin Department of Transportation and all approvals
from the grant coordinators have been received.
A complete bid tabulation and the signed/approved request to award from the WisDOT is
attached to this memo for reference.
I would like to extend a heartfelt thank you to Tori Jennings and Steve Menzel (Friends of the
Plover River Crossing Trail co-chairs), Rettler Corporation, Mayor Wiza, the city park commission,
the city common council, numerous donors, advocates and volunteers for the unwavering
support of this project over the last five plus years. It has truly taken a community to see this
project come from concept to the brink of construction!
The project is scheduled for completion in September of 2026.
Staff Recommendation:
1. Award the contract to Highway Landscapers, Inc. in the amount of $1,796,643.43.
a. Comptroller Ladick confirmed the city will pay for the project up front and be
reimbursed from the WisDOT and Friends of Plover River Crossing at the end of
construction.
Page 2 of 5
Project: City of Stevens Point Plover River Crossing
Bid Item Estimated
No. Item Description Units Quantity Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Ext ension
201.0105 Clearing STA 16.0 $950.00 $15,200.00 $593.00 $9,488.00 $950.00 $15,200.00 $ 1,200.00 $19,200.00 $1,782.00 $28,512.00 $1,050.00 $16,8 00.00 $1,500.00 $24,000.00
201.0205 Grubbing STA 13.0 $950.00 $12,350.00 $599.00 $7,787.00 $950.00 $12,350.00 $800.00 $10,400.00 $ 1,725.00 $22,425.00 $700.00 $9,100.00 $1,450.00 $18,850. 00
213.0100 Finishing Roadway (6998-14-71) EACH 1.0 $500.00 $500.00 $330.00 $330.00 $1,500.00 $1,500.00 $2,50 0.00 $2,500.00 $1,782.00 $1,782.00 $5,000.00 $5,000.00 $1 ,500.00 $1,500.00
305.0120 Base Aggregate Dense 1 1/4-Inch TON 670.0 $30.00 $20,100.00 $25.00 $16,750.00 $30.00 $20,100.00 $30 .70 $20,569.00 $26.50 $17,755.00 $24.80 $16,616.00 $22.25 $14,907.50
465.0105 Asphaltic Surface TON 207.0 $231.50 $47,920.50 $231.50 $47,920.50 $231.50 $47,920.50 $231.50 $47,920.50 $185.00 $38,295.00 $235.00 $48,645.00 $231.50 $47,920.50
465.0315 Asphaltic Flumes S.Y. 7.0 $70.00 $490.00 $70.00 $490.00 $70.00 $490.00 $70.00 $490.0 0 $179.00 $1,253.00 $88.00 $616.00 $70.00 $490.00
502.0100 Concrete Masonry Bridges C.Y. 16.2 $500.00 $8,100.00 $1,255.00 $20,331.00 $500.00 $8,100.00 $4,000.00 $64,800.00 $2,115.00 $34,263.00 $3,000.00 $48, 600.00 $2,050.00 $33,210.00
502.3200 Protective Surface Treatment S.Y. 60.0 $2.00 $120.00 $4.95 $297.00 $2.00 $120.00 $60.00 $3,600.00 $28.00 $1,680.00 $3.00 $180.00 $7.00 $420.00
505.0600 Bar Steel Reinforcement HS Coated
Structures LB 2760.0 $2.49 $6,872.40 $3.10 $8,556.00 $2.49 $6,872.40 $8.00 $22, 080.00 $1.50 $4,140.00 $4.00 $11,040.00 $3.50 $9,660.00
506.0105 Structural Steel Carbon LB 86.0 $5.00 $430.00 $20.00 $1,720.00 $5.00 $430.00 $20.00 $1,720 .00 $13.00 $1,118.00 $20.00 $1,720.00 $56.00 $4,816.00
506.8006.S Prefabricated Steel Truss Pedestrian Bridge
B-49-201 LRFD EACH 1.0 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,00 0.00 $200,000.00 $300,000.00 $300,000.00 $230,000.00 $23 0,000.00 $205,000.00 $205,000.00 $320,000.00 $320,000.0 0
511.1200 Temporary Shoring R-49-31 S.F. 1600.0 $40.00 $64,000.00 $37.00 $59,200.00 $40.00 $64,000.00 $40 .00 $64,000.00 $30.50 $48,800.00 $60.00 $96,000.00 $26.00 $41,600.00
550.0500 Pile Points EACH 6.0 $350.00 $2,100.00 $135.00 $810.00 $350.00 $2,100.00 $29,5 00.00 $177,000.00 $366.00 $2,196.00 $250.00 $1,500.00 $26 5.00 $1,590.00
550.2126 Piling CIP Concrete 12 3/4 X 0.375-Inch L.F. 480.0 $60.00 $28,800.00 $92.00 $44,160.00 $60.00 $28,800.00 $80 .00 $38,400.00 $68.00 $32,640.00 $75.00 $36,000.00 $98.00 $47,040.00
601.0411 Concrete Curb & Gutter 30-Inch Type D L.F. 29 5.0 $95.00 $28,025.00 $83.00 $24,485.00 $36.96 $10,903.20 $30 .00 $8,850.00 $113.00 $33,335.00 $58.00 $17,110.00 $46.00 $13,570.00
602.0415 Concrete Sidewalk 6-Inch S.F. 122.0 $17.00 $2,074.00 $18.00 $2,196.00 $33.71 $4,112.62 $10.00 $1,220.00 $12.00 $1,464.00 $24.00 $2,928.00 $40.00 $4,880 .00
602.0515 Curb Ramp Detectable Warning Field Natural
Patina S.F. 40.0 $55.00 $2,200.00 $53.00 $2,120.00 $50.00 $2,000.00 $45.00 $1,800.00 $60.00 $2,400.00 $60.00 $2,400.00 $50.00 $2,000 .00
606.0200 Riprap Medium C.Y. 3.0 $150.00 $450.00 $123.00 $369.00 $150.00 $450.00 $200.00 $6 00.00 $150.00 $450.00 $280.00 $840.00 $125.00 $375.00
612.0406 Pipe Underdrain Wrapped 6-Inch L.F. 300.0 $15.00 $4,500.00 $6.70 $2,010.00 $15.00 $4,500.00 $30.00 $ 9,000.00 $3.00 $900.00 $28.00 $8,400.00 $17.00 $5,100.00
619.1000 Mobilization EACH 1.0 $361,367.07 $361,367.07 $121,585.00 $121,585.00 $271,50 4.66 $271,504.66 $65,000.00 $65,000.00 $228,125.00 $228, 125.00 $296,000.00 $296,000.00 $357,000.00 $357,000.00
625.0500 Salvaged Topsoil S.Y. 1164.0 $8.00 $9,312.00 $7.00 $8,148.00 $8.00 $9,312.00 $5.00 $5,8 20.00 $4.50 $5,238.00 $8.00 $9,312.00 $3.50 $4,074.00
627.0200 Mulching S.Y. 273.0 $2.50 $682.50 $3.00 $819.00 $2.50 $682.50 $3.00 $819.00 $3. 00 $819.00 $3.00 $819.00 $2.50 $682.50
628.1504 Silt Fence L.F. 1279.0 $2.00 $2,558.00 $4.00 $5,116.00 $2.00 $2,558.00 $3.50 $4,4 76.50 $2.50 $3,197.50 $3.50 $4,476.50 $2.00 $2,558.00
628.1520 Silt Fence Maintenance L.F. 1279.0 $0.01 $12.79 $0.10 $127.90 $0.01 $12.79 $0.10 $127.90 $1.50 $1,918.50 $0.50 $639.50 $1.00 $1,279.00
628.2002 Erosion Mat Class I Type A S.Y. 501.0 $2.50 $1,252.50 $1.05 $526.05 $2.50 $1,252.50 $3.00 $1,503 .00 $3.00 $1,503.00 $2.50 $1,252.50 $2.50 $1,252.50
628.2006 Erosion Mat Urban Class I Type A S.Y. 391.0 $3.00 $1,173.00 $2.00 $782.00 $3.00 $1,173.00 $4.50 $1,759 .50 $3.50 $1,368.50 $5.00 $1,955.00 $2.75 $1,075.25
628.6005 Turbidity Barriers S.Y. 102.0 $50.00 $5,100.00 $34.00 $3,468.00 $50.00 $5,100.00 $60.00 $6,120.00 $66.50 $6,783.00 $55.00 $5,610.00 $55.75 $5,686 .50
628.7504 Temporary Ditch Checks L.F. 36.0 $25.00 $900.00 $6.00 $216.00 $25.00 $900.00 $25.00 $900.00 $9.00 $324.00 $20.00 $720.00 $7.50 $270.00
628.7560 Tracking Pads EACH 2.0 $1,500.00 $3,000.00 $1,600.00 $3,200.00 $1,500.00 $3,000 .00 $2,000.00 $4,000.00 $2,080.00 $4,160.00 $1,500.00 $3, 000.00 $1,750.00 $3,500.00
629.0210 Fertilizer Type B C.W.T. 0.7 $300.00 $219.00 $225.00 $164.25 $300.00 $219.00 $300.00 $2 19.00 $200.00 $146.00 $250.00 $182.50 $195.00 $142.35
630.0120 Seeding Mixture No. 20 L.B. 53.0 $15.00 $795.00 $7.00 $371.00 $15.00 $795.00 $25.00 $1,325. 00 $6.00 $318.00 $22.00 $1,166.00 $5.00 $265.00
630.0170 Seeding Mixture No. 70 L.B. 0.5 $1,000.00 $500.00 $635.00 $317.50 $1,000.00 $500.00 $1,00 0.00 $500.00 $125.00 $62.50 $800.00 $400.00 $105.00 $52.50
634.0814 Posts Tubular Steel 2x2-Inch x 14 Feet EACH 2 .0 $350.00 $700.00 $273.00 $546.00 $350.00 $700.00 $325.00 $6 50.00 $150.00 $300.00 $300.00 $600.00 $125.00 $250.00
637.2210 Signs Type II Reflective H S.F. 8.0 $60.00 $480.00 $22.50 $180.00 $60.00 $480.00 $50.00 $400.0 0 $54.00 $432.00 $45.00 $360.00 $45.00 $360.00
643.5000 Traffic Control EACH 1.0 $3,500.00 $3,500.00 $565.00 $565.00 $2,362.00 $2,362.00 $ 2,362.00 $2,362.00 $2,855.00 $2,855.00 $20,000.00 $20,00 0.00 $3,500.00 $3,500.00
645.0120 Geotextile Type HR S.Y. 6.0 $10.00 $60.00 $12.50 $75.00 $10.00 $60.00 $10.00 $60.00 $9. 00 $54.00 $10.00 $60.00 $7.00 $42.00
650.4500 Construction Staking Subgrade L.F. 1074.0 $1.50 $1,611.00 $1.50 $1,611.00 $1.50 $1,611.00 $1.50 $1,6 11.00 $2.00 $2,148.00 $1.50 $1,611.00 $1.50 $1,611.00
Date and Time: 9/16/25 11:00AM
CONTRACT "A" - GENERAL SITE CONSTRUCTION - BASE BID
Unit Price
Janke General Contractors, Inc. Zenith Tech Inc.Earth, Inc.Lunda Construction Company Advance Construction, Inc .
Unit Price Extension
Highway Landscapers, Inc. Michael's Construction, Inc.
Extension
Page 3 of 5
650.5000 Construction Staking Base L.F. 1074.0 $1.50 $1,611.00 $1.50 $1,611.00 $1.50 $1,611.00 $1.50 $1,6 11.00 $2.00 $2,148.00 $1.50 $1,611.00 $1.50 $1,611.00
650.5500 Construction Staking Curb Gutter and Curb &
Gutter L.F. 295.0 $2.65 $781.75 $2.65 $781.75 $2.65 $781.75 $2.65 $781.75 $4. 00 $1,180.00 $2.75 $811.25 $3.00 $885.00
650.6501.01 Construction Staking Structure Layout (B-49-
201) EACH 1.0 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $2,000 .00 $2,000.00 $2,000.00 $2,400.00 $2,400.00 $2,000.00 $2, 000.00 $2,000.00 $2,000.00
650.6501.02 Construction Staking Structure Layout (R-49-
31) EACH 1.0 $1,500.00 $1,500.00 $1,500.00 $1,500.00 $1,500.00 $1,500 .00 $1,500.00 $1,500.00 $1,785.00 $1,785.00 $1,500.00 $1, 500.00 $1,500.00 $1,500.00
650.6501.03 Construction Staking Structure Layout
(Boardwalk) EACH 1.0 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $ 10,000.00 $10,000.00 $10,000.00 $12,000.00 $12,000.00 $1 0,000.00 $10,000.00 $10,000.00 $10,000.00
650.9000 Construction Staking Curb Ramps EACH 2.0 $200.00 $400.00 $200.00
$400.00 $200.00 $400.00 $200.00 $400.00 $238.00 $476.00 $200.00 $4 00.00 $200.00 $400.00
650.9911 Construction Staking Supplemental Control
(6998-14-71) EACH 1.0 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $2,000 .00 $2,000.00 $2,000.00 $2,340.00 $2,340.00 $2,000.00 $2, 000.00 $2,000.00 $2,000.00
650.9920 Construction Staking Slope Stakes L.F. 1074.0 $1.00 $1,074.00 $1.00 $1,074.00 $1.00 $1,074.00 $1.00 $1,0 74.00 $1.50 $1,611.00 $1.00 $1,074.00 $1.00 $1,074.00
690.0150 Sawing Asphalt L.F. 10.0 $10.00 $100.00 $2.50 $25.00 $10.00 $100.00 $5.00 $50.00 $7. 50 $75.00 $10.00 $100.00 $6.00 $60.00
SPV.0060.01 Helical Pile EACH 82.0 $1,450.00 $118,900.00 $2,455.00 $201,310.00 $2,225.00 $1 82,450.00 $3,800.00 $311,600.00 $3,165.00 $259,530.00 $3 ,650.00 $299,300.00 $5,150.00 $422,300.00
SPV.0090.01 Treated Lumber and Timber Boardwalk 12'
Clear L.F. 734.0 $680.18 $499,252.12 $878.00 $644,452.00 $875.00 $642,250 .00 $670.00 $491,780.00 $780.50 $572,887.00 $995.00 $730, 330.00 $650.00 $477,100.00
SPV.0090.02
Treated Lumber and Timber Boardwalk 15'-10"
Clear L.F. 20.0 $831.38 $16,627.60 $1,083.00 $21,660.00 $1,050.00 $21,00 0.00 $900.00 $18,000.00 $1,140.00 $22,800.00 $1,490.00 $2 9,800.00 $950.00 $19,000.00
SPV.0090.03 Timber Pedestrian Railing R-49-31 L.F. 258 .0 $161.90 $41,770.20 $261.00 $67,338.00 $115.00 $29,670.00 $400.00 $103,200.00 $335.00 $86,430.00 $174.00 $44,892.0 0 $275.00 $70,950.00
SPV.0105.01 Excavation Common (Approximately 580 C.Y.) L.S. 1.0 $17,400.00 $17,400.00 $27,600.00 $27,600.00 $17,400.00 $ 17,400.00 $39,000.00 $39,000.00 $14,815.00 $14,815.00 $3 9,000.00 $39,000.00 $20,000.00 $20,000.00
SPV.0165.01 Wall Modular Block Mechanically Stabilized
Earth (R-49-31) S.F. 2050.0 $119.24 $244,442.00 $122.00 $250,100.00 $119.24 $244,442 .00 $95.00 $194,750.00 $160.00 $328,000.00 $86.25 $176,81 2.50 $140.00 $287,000.00
SPV.0195.01 Crushed Granite 6" TON 14.0 $95.00 $1,330.00 $126.00 $1,764.00 $95.00 $1,330.00 $55.0 0 $770.00 $44.00 $616.00 $80.00 $1,120.00 $37.00 $518.00
$1,796,643.43 $1,830,452.95 $1,890,179.92 $2,070,319.1 5 $2,072,253.00 $2,217,409.75 $2,291,927.60
Total Base Bid as Written $1,799,493.43 $1,830,334.15 $1,890,179.92 $2,070,319.15 $2,072,253.00 $2,217,409.7 5 $2,291,927.60
Difference -$2,850.00 $118.80 $0.00 $0.00 $0.00 $0.00 $0.0 0
Total Base Bid - Contract "A" - General Site Construction
Page 4 of 5
Page 5 of 5