CENTRAL WISCONSIN JOINT AIRPORT BOARD MEETING — Agenda Packet
Portage County · Portage County · Central WI Joint Airport Board Meeting · meeting of Jan 13, 2026 · Agenda packets
Open the original document More from Portage County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Any person planning to attend this meeting who needs some type of special accommodation to participate should call the
County Clerk’s Office at 715-261-1500 or e-mail countyclerk@co.marathon.wi.us one business day before the meeting.
CENTRAL WISCONSIN JOINT AIRPORT BOARD MEETING AGENDA
Conference Room B – East Terminal Upper Level, Mosinee, Wisconsin
January 13, 2026 - 8:00 a.m.
2024-2026 Board Members: Chair Chris Dickinson - Marathon County, Vice Chair Julie Morrow - Portage
County, Dave Ladick - Portage County, Tom Seubert - Marathon County, Kurt Kluck - Marathon County, Rick
Rettler - Portage County, Nicholas Endres - Marathon County
Mission Statement: Provide premier access to the world through aviation and be a catalyst for economic growth
in our communities. Vision Statement: To be the airport of choice for central and northern Wisconsin.
The monthly meeting of the Central Wisconsin Joint Airport Board will have the option for members and the
public to call-in via telephone conference. Airport Board members and the public may join the meeting by
calling 1-469-480-4192 and enter Conference ID 586 086 871#. The conference line will be open to calls five
(5) minutes prior to the meeting start time listed above.
1) Call to Order by Chair Dickinson at 8:00 a.m.
a) Pledge of Allegiance
2) Approval of Minutes of the December 9, 2025 Board Meeting
3) Public Comment Period: 15-minute time limit
4) Review and Possible Action on On-Call Airport Engineering Services Consultant Selection
5) Staff Reports
a) Director Report
i) Air Service Update
ii) Statistical Report
iii) Flight Schedule
iv) Legislative Update
b) Financial Reports
i) Revenues and Expenses
ii) Budget Comparison
iii) PFC Update
c) Operations and Project Reports
i) Update on Airport Operations
ii) Update on Airport Projects
6) Ovation
a) Fixed Base Operator Report
7) Next Scheduled Meeting Date: February 10, 2026 at 8:00 a.m.
8) Adjournment
01
CENTRAL WISCONSIN JOINT AIRPORT BOARD MEETING MINUTES
CENTRAL WISCONSIN AIRPORT TERMINAL
Conference Room B – East Terminal Upper Level, Mosinee, Wisconsin
December 9, 2025 - 8:00 a.m.
Airport Board: Chris Dickinson, Chair J ulie Morrow, Vice Chair
Dave Ladick Kurt Kluck - via Teams
Rick Rettler Th omas Seubert
Nicholas Endres
Staff: Brian Grefe, Airport Director Mark Cihlar, Assistant Airport Director
Dave Drozd, Finance Director J ulie Ulrick, Badging Coordinator
Visitors: Karl Kemper, Becher Hoppe Josh Harris, Ovation
Call to Order: Meeting called to order by Chair Dickinson at 8:00 a.m.
Approval of Minutes: Motion by Ladick, second by Rettler to approve the minutes of the November 11, 2025 board
meeting. Motion carried unanimously.
Public Comment Period: None.
Review and Possible Action on Annual Airport Goals:
On December 12th, the airport’s annual planning session was held and facilitated by Steve Smith, retired Campus
Dean of Mid-State Technical College. The objective of the planning session was to identify and recommend to the
airport board a reasonable number of goals that have the biggest impact on the airport that work toward the
Mission/Vision statements. Airport staff and a number of board members and tenants participated in the exercise.
The goals developed for 2026 were: Expand Air Service, Exceed Customer Expectations, Attract and Retain Effective
Employees, Develop Plan for Future Growth and Explore Business Opportunities. Motion by Seubert, second by
Morrow to approve the 2026 annual airport goals as presented. Motion carried unanimously.
Staff Reports:
Director Report – Brian Grefe
Air Service Update – No real changes are anticipated through December. Promotional marketing for United has
begun for their return on May 21, 2026.
Statistical Report – The October statistical report shows total operations up 9.9% on the month, down 6.0% on the
year. Enplanements rose 12.1% for October, down 7.7% for the year. Load factors ended with American at 72.3%
and Delta at 79.4%.
Flight Schedule – The flight schedule remains at five daily flights. Several casino charters to Laughlin, NV have been
scheduled.
Financial Reports – Dave Drozd:
Revenues and Expenses – November revenues end at 74.84% of budget, with expenses ending at 77.64%. Year end
entries and close out procedures will begin in December and run through January.
Budget Comparison – The budget comparison report shows a $125,674 deficit to date. Debt service and insurance
have not been charged back as of the November report.
PFC Update – No updates.
02
Operations & Project Reports – Mark Cihlar:
Update on Airport Operations – The snowy start to winter has operationally been going very well. A new type of
bristles were installed on the brooms, which are a steel wire and poly mix rather than poly only. They have been
doing a great job. Maintenance crews have not had to use chemicals on the runway yet and equipment has been
running well. Both OMT-I positions have been filled and the new employees are fully trained. There were a couple of
diversions that landed over the holiday weekend, which benefits both Ovation and the airport.
Update on Airport Projects – Construction on the transient hangar project was paused last week with crews unable to
get footings into ground prior to winter weather. Construction will resume in spring starting with the footings and
headers. Facility opening will be pushed back to late August or early September. The hangar will be available for
next winter season. GA term building contracts have been awarded and the contractor and Woolpert are already
working though submittals and ordering materials. A pre-construction meeting will be held soon and site prep
should start in March, with construction continuing throughout 2026. An FAA meeting is scheduled for tomorrow to
begin discussing construction of the new ARFF/SRE facility in 2028.
Ovation – Fixed Base Operator Report:
Early winter weather has brought an uptick in traffic. One winter event, they remained staffed overnight to hangar
and deice aircraft, providing services through the winter event. They’ve received several more A&P mechanic
applications they will be reviewing.
ROLL CALL VOTE TO GO INTO CLOSED SESSION pursuant to Wis. Stat. 19.85(1)(c) For the purpose of considering
employment, promotion, compensation or performance evaluation data of any public employee over which the
governmental body has jurisdiction or exercises responsibility: To wit contract and annual performance appraisal
of Airport Director Brian Grefe: 8:41 a.m. Motion by Ladick, second by Morrow to move into closed session. Roll
call vote: Dickinson, Ladick, Morrow, Rettler, Endres, Seubert. All ayes.
MOTION TO RETURN TO OPEN SESSION (No Roll Call vote needed):
9:49 a.m. Motion by Ladick, second by Morrow to return to open session. Motion carried unanimously. No
announcements were made.
Next Scheduled Meeting Date: January 13, 2026 at 8:00 a.m.
Adjournment: 9:59 a.m. Motion by Seubert, second by Ladick to adjourn. Motion carried unanimously.
_______________________________________
Julie Ulrick, Recording Secretary
03
Ag
enda Item Summary
Airport Board Meeting Date: January 13, 2026
Agenda Item Title: #4) Review and Possible Action on On-Call Airport Engineering Services Consultant Selection
Board Member: Dave Ladick
Staff Responsible: Mark Cihlar, Assistant Airport Director
Background: CWA has planned for numerous airport engineering projects through the Terminal Area Master Plan
(TAMP), and several of those projects are ready to move from the planning stage into design. CWA’s last On-Call Airport
Engineering Consulting Contract (civil engineering) was selected through a competitive selection in 2020, and the
contract expired on August 31, 2025. Additionally, some of the projects now being considered were not included in the
2020 selection. For these reasons, it is necessary for CWA to conduct a new competitive selection for airport engineering
services.
The FAA has clear guidance on the process for competitive selection of consultant services, specifically through FAA
Advisory Circular 150/5100-14E – Architectural, Engineering, and Planning Consultant Se rvices f or Airport Grant Projects.
The FAA requires that consultants be selected based on qualifications to ensure the best qualified consultant is selected.
Price cannot be considered when selecting the most qualified firm. After the most qualified firm is se lected, a detailed
design contract scope of work is finalized and a fee for the work is negotiated. If th e airp ort and consultant cannot agree
on an acceptable scope/fee, the airport then has the option to suspend negotiations and begin negotiations with the
next most qualified firm.
CWA staff have completed the consultant selection process for On-Call Airport Architectural Consultant Services through
a request for qualifications in accordance with FAA Advisory Circular 150/5100-14E. See attached Record of Selection for
details regarding this procurement action, which was determined by a selection committee including two CWA staff, one
Joint Airport Board member, and one BOA representative.
If the committee’s recommendation for selection is approved by the Board, this selection will lead to contract
negotiations for a 5-year, on-call no-cost contract between the selected firm and the airport. The 5-year, on-call contract
will provide a mechanism for the firm to provide both design and construction administration services for Capital
Improvement Projects at CWA.
Timeline: After selection by the board, CWA staff will work with the selected firm to finalize the no-cost on-call contract.
CWA staff will also work with the selected firm to develop a detailed scope of work for the design of the General Aviation
Access Road as planned in the Terminal Area Master Plan. Additional design contracts will be considered when
appropriate to meet the objectives of the Airport Board.
04
Agenda Item Summary
Financial Impact: The current selection will have no immediate financial cost but will position the airport to initiate
future projects. Specific design costs will be considered on a project-by-project basis and will be presented to the board
for approval at a later date.
Contributions to Airport Goals: This selection supports the implementation of the 2023 Terminal Area Master Plan and
contributes to the 2026 Goal to Develop Plan for Future Growth.
Recommended Action: The selection committee recommends approval of the shortlisted respondents in the Record of
Selection and selection of the Becher Hoppe team for On-Call Airport Engineering Services and contract negotiations for
upcoming projects at the Central Wisconsin Airport.
05
Mailing Address:
100 CWA Drive, Suite 227
Mosinee, WI 54455
Phone: 715-693-2147
Visit us at www.fly-cwa.org
Record of Selection:
Central Wisconsin Airport
On-Call Airport Architectural Consultant Services
Date: January 8, 2026
Contract Title: On-Call Airport Engineering Services - 2026
Location: Central Wisconsin Airport
Anticipated A.I.P. Grant: TBD
1. Central Wisconsin Airport (CWA) issued a Request for Qualifications (RFQ) for Airport
Architectural Consultant Services on December 3 , 202 6. This RFQ was conducted in
accordance with FAA Advisory Circular 150/5100-14E.
2. The RFQ was publicized in the Mosinee Times as well as the Marathon County RFPs/Bids
website.
3. On January 6, 2026, the deadline for submitting Statements of Qualifications (SOQ) for the RFQ,
CWA received two SOQs from the following firms: TKDA and Becher Hoppe Associates.
4. On January 6, 2026, a 4-member selection committee, including two CWA Staff, one CWA Board
member, and one BOA representative, convened to review the two SOQs. The two SOQs were
ranked according to the criteria identified in the RFQ. Both were competent and competitive
proposals that met the minimum requirements of the RFQ and were qualified to be shortlisted for
ranking. After revi ewing both proposals and completing the initial ranking, t he evaluation
committee determined that additional presentations from each firm would not change the final
scoring, and agreed that selection could be made based on written proposals alone . The
selection committee did consider the option of separate rankings for specific projects, but
ultimately recommended one ranking for all projects. The following information briefly
summarizes the evaluations of the two firms and the final shortlist ranking:
a. TKDA’s proposal demonstrated strong experience in both large- hub commercial airpor t
projects and in small General Aviation airport projects. The project team was also very
strong, with a unique perspective offered through their Project Manager who’s past
experience includes working for the BOA as a PM for CWA, and managing the airport
maintenance department at MKE. The TKDA proposal effectively promoted TKDA as a
whole, while clearly having been prepared an d tailored specifically to CWA’s RFQ. This
was evident in their thorough review of the 2023 Terminal Area Master P lan and by
addressing specific needs and opportunities for CWA’s upcoming projects. TKDA also
demonstrated a clear understanding and ability to manage all phases of a project. The
only two areas that some, but not all, evaluation committee members had concerns
06
Mailing Address:
100 CWA Drive, Suite 227
Mosinee, WI 54455
Phone: 715-693-2147
Visit us at www.fly-cwa.org
included 1) the physical proximity of the TKDA offices and their ability to provide the level
of on-site support CWA has come to rely on for project, and 2) concerns with the potential
for CWA to be given a lower priority than TKDA’s larger clients, specifically MKE and MAC.
Despite these concerns, all of the committee members agreed that TKDA could be
successful if selected for any of the projects.
b. The Becher Hoppe Associates proposal demonstrated strong experience in comparable
types of projects and delivery methods to those planned at CWA, including well executed
projects in the past at CWA. The Becher Hoppe project team is also very strong, including
extensive relevant experience at CWA on multiple levels of the or ganization. Becher
Hoppe also demonstrates a level of understanding and familiarity with CWA’s unique local
issues that is diff icult to exceed, with Becher Hoppe staff understanding many issues
better than airport staff. Becher Hoppe demonstrated a clear understanding of the work
CWA is looking to accompl ish. F inally, Becher Hoppe has effectively manage d and
supported projects at CWA in the past, including exceptional collaboration with staff and
the Central Wisconsin Joint Airport Board.
c. The final scoring out of a maximum of 100 points, in accordance with the evaluation criteria
in the RFP, of the two shortlisted respondents was:
• TKDA – 85.125
• Becher Hoppe Associates – 100
d. After ranking by the selection committee, CWA staff contacted references for both firms.
Reference comments were strong for both, but did not provide any additional information
that would necessitate adjustments to the scoring or final ranking.
e. Final Ranking / Shortlist:
• Highest Ranked Firm: Becher Hoppe Associates
• 2 nd Highest Ranked Firm: TKDA
5. On January 13, the selection committee will recommend to the Central Wisconsin Joint Airport
Board to approve the shortlist and selection of Be cher Hoppe Associates for On-Call Airport
Engineering services and contract negotiations for upcoming projects at the Central Wisconsin
Airport.
a. In the event contract negotiations with Becher Hoppe are unsuccessful, the 2nd highest
ranked firm, TKDA, would be eligible for consideration in accordance with FAA Advisory
Circular 150/5100-14E.
_____________________________
Mark Cihlar, A.A.E.
Assistant Airport Director
07
CENTRAL WISCONSIN AIRPORT STATISTICAL REPORT `
SUMMARY - NOVEMBER 2024 - 2025
30-Dec-25
2024 2025 % CHGE. 2024 2025 % CHGE.
MONTH MONTH 24-25 Y-T-D Y-T-D 24-25
ACTUAL LANDINGS
AMERICAN 52 83 59.6% 882 877 -0.6%
AVELO 0 0 0.0% 62 0 -100.0%
DELTA 59 59 0.0% 666 675 1.4%
CHARTERS 1 2 100.0% 16 16 0.0%
TOTAL OPERATIONS 224 288 28.6% 3,252 3,136 -3.6%
ATCT OPERATIONS 707 941 33.1% 12,584 10,880 -13.5%
AIRLINE CANCELLATIONS
AMERICAN 0 6 100.0% 11 15 36.4%
AVELO 0 0 0.0% 0 0 0.0%
DELTA 0 0 0.0% 4 4 0.0%
TOTAL CANCELLATIONS 0 6 100.0% 15 19 26.7%
ENPLANED PASSENGERS
AMERICAN 1,811 3,586 98.0% 34,849 39,326 12.8%
AVELO 0 0 0.0% 8,170 0 -100.0%
DELTA 3,315 3,145 -5.1% 39,541 39,211 -0.8%
CHARTERS 185 328 77.3% 2,278 2,260 -0.8%
TOTAL ENPLANED PASSENGERS 5,311 7,059 32.9% 84,838 80,797 -4.8%
DEPLANED PASSENGERS
AMERICAN 2,119 3,538 67.0% 35,664 37,632 5.5%
AVELO 0 0 0.0% 8,126 0 -100.0%
DELTA 3,319 3,176 -4.3% 37,722 38,858 3.0%
CHARTERS 185 328 77.3% 2,278 2,260 -0.8%
TOTAL DEPLANED PASSENGERS 5,623 7,042 25.2% 83,790 78,750 -6.0%
AIR FREIGHT - AMERICAN 0 14 100.0% 603 170 -71.8%
AIR FREIGHT - DELTA 0 0 0.0% 0 0 0.0%
TOTAL AIRFREIGHT - AIRLINES 0 14 100.0% 603 170 -71.8%
TOTAL AIRFREIGHT - GENERAL AVIATION 130,290 94,266 -27.6% 1,518,369 1,374,643 -9.5%
AIRLINES & GEN AVIATION - AIR FREIGHT 130,290 94,280 -27.6% 1,518,972 1,374,813 -9.5%
LOAD FACTOR - CURRENT MONTH SEATS PAX FACTOR
AMERICAN 5,483 3,586 65.4%
DELTA 4,484 3,145 70.1%
08
09
Central Wisconsin Airport – Flight Schedule
January 13, 2026
Arrivals – Delta
4982 15: 38 from MSP CRJ-900
4934 21: 21 from MSP CRJ-900
Departures – Delta
5384
07:00 to MSP CRJ-900
4982 16:18 to MSP CRJ-900
Arrivals – American
3381 16:40 from ORD E170
3484 22:09 from ORD E170
Departures – American
3362 06:00 to ORD
E170
3363 17: 12 to ORD E170
Arrivals – United
Coming May 21, 2026
Departures – United
Coming May 21, 2026
MSP = Minneapolis
ORD = Chicago O’Hare
Total CWA Flights Daily = 4
Upcoming Charter Schedule
Jan. 12th – Sun Country to Laughlin
Jan. 25th – Sun Country to Laughlin
Feb 27th – Sun Country to Laughlin
10
FIN - Budget vs Actual for Organization
Company County of Marathon
Organization Cost Center: 53510 CWA Operations
Period FY2025 - December
Ledger Account Original Budget Actuals (Current Period) Actuals (YTD) Budget Remaining Budget Used (%)
Revenues
Federal Grants 0 0 8,248
State Grants - Other 0 0 0
Parking Fees 1,200,000 90,314 1,008,276
Airport Fees 2,230,000 342,655 2,641,707
Advertising 55,000 0 0
Other Public Charges for Services 0 8,100 67,583
Other Local Governments 0 0 0
Interest on Investments 24,000 0 0
Property Sales 0 24,250 137,224
Other Miscellaneous Revenues 170,000 0 0
Transfer In from Other Funds 740,860 0 0
Gain/Loss Sales of Fixed Assets 65,000 0 0
Total Revenues 4,484,860 465,319 3,863,039 621,821 86.14%
Expenditures
Personnel 2,115,039 180,601 1,869,222 245,817 88.38%
Salaries and Wages 131,293 1,355,326
Employee Benefits 933 11,660
Employer Contributions 48,376 502,236
Contractual Services 936,000 34,550 854,107 81,893 91.25%
Professional Services 9,079 286,080
Utility Services 1,477 232,852
Repair and Maintenance Services - Other 3,398 118,224
Special Services - IT 19,835 202,646
Other Contractual Services 762 14,305
Materials and Supplies 533,600 4,411 388,348 145,252 72.78%
Office Supplies 25 26,888
Publications, Subscriptions and Dues 930 42,956
Travel 0 14,760
Operating Supplies 1,194 36,840
Repair and Maintenance Supplies 545 111,339
Other Repairs and Maintenance Supplies 785 51,746
Other Supplies and Expense 931 103,818
Building Materials 73,000 1,040 49,954 23,046 68.43%
Concrete and Clay Products 0 25,464
Metal Products 140 691
Wood Products 0 0
Raw Materials 900 6,079
Electrical Fixtures and Small Appliances 0 710
Fabricated Materials 0 17,011
Fixed Charges 125,000 0 33,867 91,133 27.09%
Insurance 0 24,080
Other Permits and Regulatory Fees 0 545
Rents and Leases 0 9,242
Capital Outlay 250,000 45,178 855,532 (605,532) 342.21%
Debt Service 452,221 0 0 452,221 0.00%
Total Expenditures 4,484,860 265,780 4,051,030 433,830 90.33%
Net Change 199,539 (187,991)
11
2024-2025 CWA Budget Summary YTD - December
December YTD - 2025 December YTD - 2024 % CHANGE
Federal Grants $8,248 $985,567
State Grants - Other $0 $241,775
Parking Fees $1,008,276 $1,035,182
Airport Fees $2,641,707 $2,330,363
Other Charges for Services $67,583 $49,138
Other Local Governments $0 $101,561
Property Sales $137,224 $242,274
Other Miscellaneous Revenues $0 $44,651
Total Revenues $3,863,038 $5,030,511 -23.21%
Personnel Services $1,869,222 $2,074,414
Contractual Services $854,107 $1,381,889
Supplies and Expense $388,348 $460,112
Building Materials $49,954 $16,775
Fixed Charges-Insurance $33,867 $99,943
Depreciation $0 $4,772,040
Capital Outlay $855,532 -$14,214
Total Expenses $4,051,030 $8,790,959 -53.92%
Revenue over Expense -$187,992 -$3,760,448
12