CENTRAL WISCONSIN JOINT AIRPORT BOARD — Agenda Packet
Portage County · Portage County · Central WI Joint Airport Board Meeting · meeting of Dec 9, 2025 · Agenda packets
Open the original document More from Portage County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
County Clerk’s Office at 715-261-1500 or e-mail countyclerk@co.marathon.wi.us o ne business day before the meeting.
CENTRAL WISCONSIN JOINT AIRPORT BOARD MEETING AGENDA
Conference Room B – East Terminal Upper Level, Mosinee, Wisconsin
December 9, 2025 - 8:00 a.m.
2024-20
26 Board Members: Chair Chris Dickinson - Marathon County, Vice Chair Julie Morrow - Portage
County, Dave Ladick - Portage County, Tom Seubert - Marathon County, Kurt Kluck - Marathon County, Rick
Rettler - Portage County, Nicholas Endres - Marathon County
Mission Statement: Provide premier access to the world through aviation and be a catalyst for economic growth
in our communities. Vision Statement: To be the airport of choice for central and northern Wisconsin.
The monthly meeting of the Central Wisconsin Joint Airport Board will have the option for members and the
public to call-in via telephone conference. Airport Board members and the public may join the meeting by
calling 1-469-480-4192 and enter Conference ID 586 086 871#. The conference line will be open to calls five
(5) minutes prior to the meeting start time listed above.
1) Call to Order by Chair Dickinson at 8:00 a.m.
a) Pledge of Allegiance
2) Approval of Minutes of the November 11, 2025 Board Meeting
3) Public Comment Period: 15-minute time limit
4) Review and Possible Action on Annual Airport Goals
5) Staff Reports
a) Director Report
i) Air Service Update
ii) Statistical Report
iii) Flight Schedule
b) Financial Reports
i) Revenues and Expenses
ii) Budget Comparison
iii) PFC Update
c) Operations and Project Reports
i) Update on Airport Operations
ii) Update on Airport Projects
6) Ovation
a) Fixed Base Operator Report
7) ROLL CALL VOTE TO GO INTO CLOSED SESSION pursuant to Wis. Stat. 19.85(1)(c) For the purpose of
considering employment, promotion, compensation or performance evaluation data of any public employee
over which the governmental body has jurisdiction or exercises responsibility: To wit contract and annual
performance appraisal of Airport Director Brian Grefe
8) MOTION TO RETURN TO OPEN SESSION (No Roll Call vote needed)
9) Next Scheduled Meeting Date: January 13, 2026 at 8:00 a.m.
10) Adjournment
Any person planning to attend this meeting who needs some type of special accommodation to participate should call
the
01
CENTRAL WISCONSIN JOINT AIRPORT BOARD MEETING MINUTES
CENTRAL WISCONSIN AIRPORT TERMINAL
Conference Room B – East Terminal Upper Level, Mosinee, Wisconsin
November 11, 2025 - 8:00 a.m.
Airport Board: Chris Dickinson, Chair J ulie Morrow, Vice Chair
Dave Ladick Kurt Kluck – Excused
Rick Rettler Th omas Seubert – Excused
Nicholas Endres
Staff: Brian Grefe, Airport Director Mark Cihlar, Assistant Airport Director
Dave Drozd, Finance Director J ulie Ulrick, Badging Coordinator
Visitors: Karl Kemper, Becher Hoppe Josh Harris, Ovation
Collin Eiden, Ovation Marco Espinoza, GFO Aviation
Call to Order: Meeting called to order by Chair Dickinson at 8:00 a.m.
Approval of Minutes: Motion by Ladick, second by Rettler to approve the minutes of the October 14, 2025 board
meeting. Motion carried unanimously.
Public Comment Period: None.
Air Service Update and Presentation by Brian Grefe:
United Airlines announced it will be returning to CWA May 21, 2026, with three daily flights and the last arrival will
remain overnight. Skywest will be flying CRJ550s for the new service and initial flight times are excellent for CWA’s
market. CRJ550s have extra leg room in the entire aircraft and first class service will be offered. The new service is
eligible for the CWA Air Carrier Incentive Program, which offers temporary reductions in specified fees and/or
charges and marketing support, subject to the availability and limits of CWA’s approved budget. The new Regional
Air Service Development Fund will not be utilized.
The Take Off Air Service Development Conference was held last week and Director Grefe had meetings with Delta,
American, Breeze and Sun Country. Everyone was aware of United returning to CWA’s market. Delta still would like
to see a third MSP flight prior to bringing Detroit back into the market. American’s loads remain a little soft due to
flight times and the American representatives at the meeting suggested reaching out to the Chicago scheduling
office. Sun Country was interested in the MRG incentive information. Breeze said they are reducing their Orlando
service due to capacity issues and are interested in growing the Tampa market.
Review and Possible Action on Additional Work for the Air Traffic Control Tower Rehabilitation Project:
The majority of construction on the tower rehabilitation project was completed last year. Grants for that project
have approximately $120,000 in funding remaining due to a change order reduction. A recent lightning strike near
the tower caused a radio antenna malfunction in the tower. This incident brought concerns with the existing
grounding and counterpoise for the building. Staff have started working with Woolpert to evaluate grounding setup
on tower. This additional work will require an amendment to add the work into the grant project description, which
would be subject to FAA approval. Staff will work with the FAA and Woolpert to utilize remaining funds by
prioritizing additional tower needs. Motion by Morrow, second by Ladick to approve additional work on the tower
rehabilitation project and authorize the airport director to sign off on the construction administration contract
amendment with Woolpert. Motion carried unanimously.
02
Staff Reports:
Director Report – Brian Grefe
T-Hangar Rate Increase – CWA has 28 T-hangars it leases, including small and large hangars. The current lease rates
are $100/month for a small hangar and $120/month for a large hangar. Lease rates have not been raised in many
years. Rates for 2026 will be increasing to $125/month for a small hangar and $150/month for a large hangar due to
increased airport costs.
Statistical Report – Not available.
Flight Schedule – Daily flights remain at five. American changed the timing of their midday flight from a 9:30 a.m.
departure to 11:30 a.m., which will be helpful with load factors. Staff will continue working to get their third flight
moved to an earlier timeslot.
Legislative Update – US Secretary of Transportation Sean Duffy will be visiting CWA today to tour the air traffic
control tower, then he will host a media event in the terminal ticketing area around 10:30 a.m. A US Senate panel
approved legislation to require the use of advanced aircraft-tracking technology. The legislation would mandate that
all civilian aircraft, as well as military helicopters near civilian planes, be equipped with ADS-B technology by the end
of 2031. It would also boost the oversight of mixed jet and helicopter traffic and flight routes near commercial
service airports.
Assistant Airport Director Mark Cihlar was able to testify in Madison at the Senate Committee on Transportation and
Local Government hearing on a bill that is aimed at allowing the use of a Construction Manager At Risk to streamline
Wisconsin airport construction projects. The committee will vote on the bill and then, if passed, the bill would move
on to the State Senate floor for consideration. The accompanying State Assembly bill is being heard tomorrow by the
Assembly Transportation Committee and Cihlar will be testifying at that hearing as well.
Annual Planning Session – The airport’s annual planning session will be held tomorrow and board members are
welcome to attend. Dickinson and Endres are interested in attending the session.
Financial Reports – Dave Drozd:
Revenues and Expenses – October revenues end at 69.4% of budget, with expenses ending at 71.48% of budget. For
capital items, one tractor was purchased and an old tractor was sold, and one pickup truck is scheduled for delivery
by end of year. The IT transition to Dirks Group has begun, which may require a few more capital item purchases.
2025 insurance premiums will be charged back in November or December. Supplies are well stocked going into
December and parking has been doing well.
Budget Comparison – October ends with a revenue deficit of $93,102. Debt service will be paid from the general
fund as planned.
Operations & Project Reports – Mark Cihlar:
Update on Airport Operations – A phone update to Microsoft Teams phones is part of the IT transition and it will be a
larger project. Staff are working with Dirks Group on the phone project, as well as the IT transition. The public
address system that was initially installed by tying it into the fire alarm system is being replaced and the new system
will run through newly installed speakers throughout the entire facility. The maintenance department is now fully
staffed.
Update on Airport Projects – The transient hangar project is well underway. Utilities are all in and this week crews
will be prepping for foundations. Warmer weather is forecast for later this week, which will allow for footings to go
in and crews to erect the building over winter. The project is still on track for an early June opening. The GA terminal
building project is still in the contract award phase due to the government shutdown slowing down the buy American
waiver and signing of the construction contract. The project is scheduled to begin in spring. The State has asked to
have the GA access road project ready for a June contract.
03
Ovation – Fixed Base Operator Report:
October traffic was consistent and fuels sales were up a few thousand gallons over last year. Ovation staff are fully
ready for winter operations. The flight school is now up and operational and they are working to get students back
on the books. A couple of line tech positions are open that they hope to fill soon. The search for an A&P mechanic
continues.
Next Scheduled Meeting Date: December 9, 2025 at 8:00 a.m.
Adjournment: 8:58 a.m. Motion by Ladick, second by Rettler to adjourn. Motion carried unanimously.
_______________________________________
Julie Ulrick, Recording Secretary
04
CWA Annual Goals 2026
Action Step Benefit/Measure of Success Necessary Resources Potential Challenges
What needs to be done? How will this benefit the airport? What do you need to complete this step? Are there any potential challenges?
Grow and expand Regional Aviation
Development Fund
Market all air service options
Optimize flight times for existing
destinations
Accept more flight diversions
Recapture Detroit service
Attract a low-cost carrier
Continue to work with DMO's and
Wisconsin for inbound marketing
GOAL #1: Expand Air Service
SUB-GOAL: Expand Commercial Air Service
Additional destinations and available seats
should increase airport passengers driving
an increase in aeronautical revenues,
passenger facility charges, customer facility
charges, and parking numbers.
Resources needed to see a potential
increase in commercial seats are: frequent
and productive meetings with various
airlines, a robust airline incentive program,
maintaining low fees, and updated per-turn
pricing. The airlines will need to provide
additional capacity and destinations.
Challenges to this sub-goal are airline fleet
sizes, fuel prices, individual airline business
models, CWA's proximity to existing hubs,
the pilot shortage, and available airline
staffing.
05
Action Step Benefit/Measure of Success Necessary Resources Potential Challenges
What needs to be done? How will this benefit the airport? What do you need to complete this step? Are there any potential challenges?
Create routine inspection and cleaning
duties including the terminal, shop and
ATCT
Will ensure a positive first impression for
guests arriving airside and landside, the
community and airport neighbors. A well
kept and clean facility will encourage
repeat visits.
Allocate staff time and prioritize this effort. Multiple responsibilities on limited staff
could, at times, limits success, i.e. snow
removal.Action Step Benefit/Measure of Success Necessary Resources Potential Challenges
What needs to be done? How will this benefit the airport? What do you need to complete this step? Are there any potential challenges?
Identify current deficiencies in
preventative facility maintenance
Determine what levels of PMs can be
completed by staff, and what would need
to be contracted out
Develop and execute a plan to install
complete 2026 landscaping services
An effective PM program will minimize
service interruptions that affect our
customers.
Staff time will be the biggest necessary
resource, but certain PM projects will
require contractual services.
Staff technical training will limit what PM
items can be performed in-house. Decision
making will need to be timely.
GOAL #2: Exceed Customer Expectations
SUB-GOAL: Evaluate and Adjust Cleaning Procedures to Provide the Best Possible Experience
SUB-GOAL: Focus Efforts on Preventative Maintenance
06
Action Step Benefit/Measure of Success Necessary Resources Potential Challenges
What needs to be done? How will this benefit the airport? What do you need to complete this step? Are there any potential challenges?
Identify training focus areas
Identify effective training resources and
continuing education opportunities
Create and implement a training tracking
system and schedule
Action Step Benefit/Measure of Success Necessary Resources Potential Challenges
What needs to be done? How will this benefit the airport? What do you need to complete this step? Are there any potential challenges?
Explore seasonal shift changes
Explore night shift rotations
SUB-GOAL: Optimize Work Schedules
Would give staff an opportunity to cross
train on different shifts and with different
people. A increase in team capability
would be a benefit
This plan would need to be developed in-
house drawing on everyone's individual
experiences.
Buy-in from a majority of the team could
be a challenge as many people have built
their lives around the current schedule. To
go to a new plan would need to be
thoroughly vetted
SUB-GOAL: Implement a CWA Specific Training Program
Better educated staff will create improved
efficiencies, enhance the quality of the
passenger experience, and create a more
coordinated airport overall.
Available staff time could limit the success. This process will be created by CWA. This
will require significant time from all team
members.
GOAL #3: Attract and Retain Effective Employees
07
Action Step Benefit/Measure of Success Necessary Resources Potential Challenges
What needs to be done? How will this benefit the airport? What do you need to complete this step? Are there any potential challenges?
Identify infrastructure needs for potential
growth in air service
Engage with air carriers on their current
and future needs
Communicate with internal departments
to accomplish work/tasks
Start the process to secure funding for a
new ARFF/SRE facility in 2028
Develop baggage makeup area expansion
plan
Action Step Benefit/Measure of Success Necessary Resources Potential Challenges
What needs to be done? How will this benefit the airport? What do you need to complete this step? Are there any potential challenges?
Create new FBO agreement(s) for new GA
terminal and facilities
Evaluate additional non-aeronautical
revenue
Explore opening upstairs restaurant
Evaluate opening second parking lot
SUB-GOAL:
A diverse revenue stream with reasonable
rates and charges will help to growth
airport revenues and support all airport
partners.
Staff time, proactive business partners, and
creative business-minded thinking will be
important.
Additional business opportunities and
growth at the airport is demand driven. A
great business idea without support or
anyone to run with it will fail.
GOAL #5: Explore Business Opportunities
GOAL #4: Develop Plan for Future Growth
Planning for future needs and conservative
development will help to ensure the
Central Wisconsin Airport is prepared to
meet the current and future needs of its
users, tenants, and guests.
Thoughtful planning and strategic fund
allocation when warranted will be
important.
Expenses are the biggest limiting factor.
Planning for any type of development
should maximize all available funding
types. Airport generated revenues should
be prioritized as well.
SUB-GOAL:
08
CENTRAL WISCONSIN AIRPORT STATISTICAL REPORT `
SUMMARY - OCTOBER 2024 - 2025
03-Dec-25
2024 2025 % CHGE. 2024 2025 % CHGE.
MONTH MONTH 24-25 Y-T-D Y-T-D 24-25
ACTUAL LANDINGS
AMERICAN 78 92 17.9% 830 794 -4.3%
AVELO 0 0 0.0% 62 0 -100.0%
DELTA 60 62 3.3% 607 616 1.5%
CHARTERS 4 2 -50.0% 15 13 -13.3%
TOTAL OPERATIONS 284 312 9.9% 3,028 2,846 -6.0%
ATCT OPERATIONS 1,233 1,121 -9.1% 11,877 9,939 -16.3%
AIRLINE CANCELLATIONS
AMERICAN 0 0 0.0% 11 9 -18.2%
AVELO 0 0 0.0% 0 0 0.0%
DELTA 0 0 0.0% 4 4 0.0%
TOTAL CANCELLATIONS 0 0 0.0% 15 13 -13.3%
ENPLANED PASSENGERS
AMERICAN 3,331 4,390 31.8% 33,038 35,740 8.2%
AVELO 0 0 0.0% 8,170 0 -100.0%
DELTA 3,507 3,739 6.6% 36,226 36,066 -0.4%
CHARTERS 545 150 -72.5% 2,093 1,596 -23.7%
TOTAL ENPLANED PASSENGERS 7,383 8,279 12.1% 79,527 73,402 -7.7%
DEPLANED PASSENGERS
AMERICAN 3,317 4,027 21.4% 33,545 34,094 1.6%
AVELO 0 0 0.0% 8,126 0 -100.0%
DELTA 3,347 3,665 9.5% 34,403 35,682 3.7%
CHARTERS 545 150 -72.5% 2,093 1,596 -23.7%
TOTAL DEPLANED PASSENGERS 7,209 7,842 8.8% 78,167 71,372 -8.7%
AIR FREIGHT - AMERICAN 0 1 100.0% 603 156 -74.1%
AIR FREIGHT - DELTA 0 0 0.0% 0 0 0.0%
TOTAL AIRFREIGHT - AIRLINES 50 1 -98.0% 603 156 -74.1%
TOTAL AIRFREIGHT - GENERAL AVIATION 153,670 135,292 -12.0% 1,388,079 1,280,377 -7.8%
AIRLINES & GEN AVIATION - AIR FREIGHT 153,720 135,293 -12.0% 1,388,682 1,280,533 -7.8%
LOAD FACTOR-CURRENT MONTH SEATS PAX FACTOR
AMERICAN 6,068 4,390 72.3%
DELTA 4,712 3,739 79.4%
09
Central Wisconsin Airport – Flight Schedule
December 9, 2025
Arrivals – Delta
4982 15:43 from MSP CRJ-900
4934 21:21 from MSP CRJ-900
Departures – Delta
5384 07:00 to MSP CRJ-900
4982 16:23 to MSP CRJ-900
Arrivals – American
3798 11:00 from ORD E170
3415 16:40 from ORD E170
3527 20:26 from ORD E170
Departures – American
3397 06:00 to ORD E170
3798 11:30 to ORD E170
3400 18:00 to ORD E170
Arrivals – United
Coming May 21, 2026
Departures – United
Coming May 21, 2026
MSP = Minneapolis
ORD = Chicago O’Hare
Total CWA Flights Daily = 5
Upcoming Charter Schedule
Jan. 12th – Sun Country to Laughlin
Jan. 25th – Sun Country to Laughlin
Feb 27th – Sun Country to Laughlin
10
FIN - Budget vs Actual for Organization
Company County of Marathon
Organization Cost Center: 53510 CWA Operations
Period FY2025 - November
Ledger Account Original Budget Actuals (Current Period) Actuals (YTD) Budget Remaining Budget Used (%)
Revenues
Federal Grants 0 0 8,248
State Grants - Other 0 0 0
Parking Fees 1,200,000 84,967 917,962
Airport Fees 2,230,000 122,014 2,257,814
Advertising 55,000 0 0
Other Public Charges for Services 0 7,690 59,483
Other Local Governments 0 0 0
Interest on Investments 24,000 0 0
Property Sales 0 0 112,974
Other Miscellaneous Revenues 170,000 0 0
Transfer In from Other Funds 740,860 0 0
Gain/Loss Sales of Fixed Assets 65,000 0 0
Total Revenues 4,484,860 214,670 3,356,482 1,128,378 74.84%
Expenditures
Personnel 2,115,039 87,099 1,623,869 491,170 76.78%
Salaries and Wages 53,829 1,169,196
Employee Benefits 411 10,275
Employer Contributions 32,860 444,398
Contractual Services 936,000 14,903 718,871 217,129 76.80%
Professional Services 4,822 240,749
Utility Services 1,376 211,410
Repair and Maintenance Services - Other 2,720 99,516
Special Services 5,800 154,785
Other Contractual Services 185 12,411
Materials and Supplies 533,600 40,493 344,764 188,836 64.61%
Office Supplies 10,450 26,443
Publications, Subscriptions and Dues 0 39,430
Travel 195 10,561
Operating Supplies 1,498 34,316
Repair and Maintenance Supplies 2,873 89,053
Other Repairs and Maintenance Supplies 1,714 43,176
Other Supplies and Expense 23,763 101,786
Building Materials 73,000 0 48,884 24,116 66.96%
Concrete and Clay Products 0 25,464
Metal Products 0 521
Wood Products 0 0
Raw Materials 0 5,179
Electrical Fixtures and Small Appliances 0 710
Fabricated Materials 0 17,011
Fixed Charges 125,000 0 33,867 91,133 27.09%
Insurance 0 24,080
Other Permits and Regulatory Fees 0 545
Rents and Leases 0 9,242
Capital Outlay 250,000 0 711,900 (461,900) 284.76%
Debt Service 452,221 0 0 452,221 0.00%
Total Expenditures 4,484,860 142,495 3,482,156 1,002,704 77.64%
Net Change 72,175 (125,674)
11
2024-2025 CWA Budget Summary YTD - November
November YTD - 2025 November YTD - 2024 % CHANGE
Federal Grants $8,248 $522,108
State Grants - Other $0 $241,775
Parking Fees $917,962 $966,308
Airport Fees $2,257,814 $2,132,787
Other Charges for Services $59,483 $49,138
Other Local Governments $0 $65,989
Property Sales $112,974 $198,907
Other Miscellaneous Revenues $0 $44,791
Total Revenues $3,356,481 $4,221,803 -20.50%
Personnel Services $1,623,869 $1,829,993
Contractual Services $718,871 $869,704
Supplies and Expense $344,764 $432,314
Building Materials $48,884 $16,775
Fixed Charges-Insurance $33,867 $5,738
Capital Outlay $711,900 $179,694
Total Expenses $3,482,155 $3,334,218 4.44%
Revenue over Expense -$125,674 $887,585
12
Source: Portage County website. First collected Nov 7, 2026.