RecordWell Data

Board of Public Works

City of Waupun · Fond du Lac County · meeting of Nov 10, 2026 · Agendas

Open the original document More from City of Waupun

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

A G E N D A CITY OF WAUPUN BOARD OF PUBLIC WORKS MEETING Waupun City Hall – 201 E. Main Street, Waupun WI Tuesday, November 10, 2026 at 4:30 PM The City of Waupun Board of Public Works and Facilities Committee will meet in-person, virtually and teleconference. Instructions to join the meeting are provided below. Virtual: https://us02web.zoom.us/j/81987138114?pwd=jmbyz8Ck1Pdb9Bh58wB99oGOinRW9y.1 Meeting ID: 819 8713 8114 Passcode: 359980 Phone: 312.626.6799 US (Chicago) CALL TO ORDER ROLL CALL PERSONS WISHING TO ADDRESS THE BOARD OF PUBLIC WORKS--State name, address, and subject of comments. (2 Minutes) No Public Participation after this point. FUTURE MEETINGS AND GATHERING INVOLVING THE BOARD OF PUBLIC WORKS 1. Next Regularly Scheduled Meeting: Tuesday, December 8, 2026, 4:30 p.m. Waupun City Hall, 201 E Main Street, Waupun, WI CONSIDERATION - ACTION 2. Minutes from October 13, 2026 Board of Public Works meeting DISCUSSION 3. City of Waupun Energy Plan and Solar Option 4. Nummerdor Dr and N. Madison St Pond Location 5. Edgewood Dr. Flood Study update 6. October Report ADJOURNMENT Upon reasonable notice, efforts will be made to accommodate disabled individuals through appropriate aids and services. For additional information, contact the City Clerk at 920-324-7915. M I N U T E S CITY OF WAUPUN BOARD OF PUBLIC WORKS MEETING Waupun City Hall – 201 E. Main Street, Waupun WI Tuesday, October 13, 2026 at 4:30 PM CALL TO ORDER Chairperson Siebers called meeting to order at 4:30pm. ROLL CALL Members Present: Cheyanne Sloan, Marica Maly, Dan Siebers, Bobbi Jo Kunz, Dave Rens, Mike Matoushek Ex Officio: Jeff Daane City Staff: Mayor Rohn Bishop, City Administrator Kathy Schlieve Absent and Excused: Dale Heeringa NO PERSONS WISHING TO ADDRESS THE BOARD OF PUBLIC WORKS FUTURE MEETINGS AND GATHERING INVOLVING THE BOARD OF PUBLIC WORKS 1. Next Regularly Scheduled Meeting: Tuesday, November 10, 2026, 4:30 p.m at Waupun City Hall. CONSIDERATION - ACTION 2. Prior Minutes Motion Matoushek, second Rens to approve minutes from August 12, 2026 Board of Public Works meeting. Carried unanimously. 3. Excel Engineering Proposal for Boiler Design and Bidding DPW Director Daane states he received initial quotes and a sourcewell quote came in significantly higher. Rather than proceeding with inconsistent quotes, Daane feels it is in the City’s best interest to use Excel Engineering to produce proper bid document ensuring all specifications are met. Motion Rens, second Kunz to approve Excel Engineering proposal in the amount of $24,800. Carried unanimously. 4. 2027-2031 Five-Year Street Plan DPW Director Daane states the five-year street plan is updated annually after current projects are completed. It serves as the roadmap for mill and overlay, reconstruction, and new builds and is required documentation for grant applications. Fond du Lac County reached out and will be doing driving lanes on MM to Beekman St and asked if the City wanted to fund parking lanes, estimated at $20,000. DPW Director Daane recommended deferring Church St to accommodate the funding needed for the MM parking lane. Motion Matoushek, second Kunz to approve 2027-2031 five year street plan with the amendment to move Church St to 2029 and include the MM parking lane cost sharing. Carried unanimously. DISCUSSION 5. August & September Work Order Report DPW Director Daane reviews work order reports and noted the City did a lot of storm sewer work and that is started to wrap up. 6. Updates Daane provides update that the dump truck that was ordered end of last year should hopefully get delivered January 2027 and the dump truck ordered in 2026 is still being built. Daane also provides update that they have found the leak at the Aquatic Center and Neuman Pools is scheduled to come back and fix it in November. ADJOURNMENT Motion Kunz, second Rens to adjourn this meeting at 4:59pm. Carried unanimously. AGENDA SUMMARY SHEET MEETING DATE: 11/10/26 TITLE: City of Waupun Energy Plan and Solar Option AGENDA SECTION: Discussion PRESENTER: Jeff Daane, Public Works Director DEPARTMENT GOAL(S) SUPPORTED (if applicable) FISCAL IMPACT Future Readiness ISSUE SUMMARY: Study Findings and Budget Challenges In 2023, the City used grant funding to study several facilities. The favorable findings identified opportunities for long-term savings through new initiatives. Departments are asked each year to maintain or reduce operating costs, but flat budgets and rising costs make this approach unsustainable over the long term. Energy-Saving Initiatives The City is evaluating the costs and payback periods for installing solar at several facilities, an option identified in the report. The City has implemented several smaller cost-saving measures recommended in the report and will continue to consider these opportunities when installing new equipment. Solar Proposal and Incentives The City has begun discussions with All Energy Solar, which is gathering information and conducting a preliminary review to prepare a quote. The federal tax credit is scheduled to end in late 2027 and, as the study shows, accounts for a substantial portion of the installation cost savings. All Energy Solar will also review updated incentive amounts from Focus on Energy. STAFF RECOMMENDATION: Continue to work with All Energy Solar for cost estimates ATTACHMENTS: City of Waupun Energy Plan RECOMMENDED MOTION: CITY OF WAUPUN DEPARTMENT OF PUBLIC WORKS Waupun City Hall – 201 E. Main Street, Waupun WI P: 920-324-7918 F: 920-324-7939 www.cityofwaupun.org City of Waupun Energy Plan OCTOBER 1, 2023 City of Waupun Page 1 Contents Executive Summary .............................................................................................................................................. 2 Glossary ................................................................................................................................................................ 4 Introduction ........................................................................................................................................................... 5 Baseline Data ....................................................................................................................................................... 6 Recommendation Overview .................................................................................................................................. 7 Energy Efficiency Recommendations ................................................................................................................... 9 Recommendation 1: Continue ongoing benchmarking of building performance ............................................... 9 Recommendation 2: Implement recommended measures for walkthrough buildings ..................................... 10 Recommendation 3: Institute a standard operating policy at all buildings ...................................................... 11 Recommendation 4: Institute a standard purchasing policy for future upgrades at all buildings .................... 12 Renewable Energy Recommendations .............................................................................................................. 13 Recommendation 1: Install 100 – 150 kW of solar at city buildings ................................................................ 13 Recommendation 2: Require all new construction for city buildings to be solar-ready. .................................. 14 Recommendation 3: Consider battery energy storage systems at generator replacement. ........................... 15 Fleet Recommendations ..................................................................................................................................... 16 Recommendation 1: Pilot 2-3 Electric Vehicles in Municipal Fleet ................................................................. 16 Recommendation 2: Use estimated total cost of vehicle ownership to guide purchasing ............................... 20 Recommendation 3: Consider how the City can advance municipal and public EV charging ........................ 21 Funding Opportunities for Recommendations .................................................................................................... 22 Inflation Reduction Act .................................................................................................................................... 22 Focus on Energy and Local Utility Incentives ................................................................................................. 23 Other Grants and Opportunities ...................................................................................................................... 23 Appendix 1: Individual Building Results .............................................................................................................. 24 Waupun Library ............................................................................................................................................... 24 Waupun Safety Building .................................................................................................................................. 26 Waupun City Hall Heating ............................................................................................................................... 28 Appendix 2: Solar Methodology and Details ....................................................................................................... 30 Appendix 3: Fleet Analysis Methodology ............................................................................................................ 35 Page 2 Executive Summary For more than a decade, the City of Waupun has been committed to lowering its energy use and carbon impact. In 2009, the City signed a resolution for a 25% reduction in energy use by 2025. In 2018, the City reconfirmed its commitment with a resolution to reduce energy use in municipal operations by 5% in five years, and then quickly met that goal by upgrading lighting across city buildings. To build on its previous efforts and identify additional potential energy cost savings, the C ity was awarded a planning grant from the State Office of Energy Innovation (OEI) at the Public Service Commission in 2022. Over the past year, the City of Waupun worked with Slipstream and Waupun Utilities, to develop a municipal energy plan that identified near-term cost-effective energy saving opportunities. The project process included: - C ollection of energy use and cost data from buildings and fleet - C ompilation of energy data to develop energy and emissions baselines - Energy assessment walkthroughs at three city facilities - Analysis of energy data, along with building and vehicle information to identify cost-savings opportunities for renewable energy, fleet conversions, and building energy efficiency Creating an inventory of current energy use, costs, and carbon by source is a vital first step in a planning process. The energy profile allows for identification of savings opportunities and serves as a baseline to use when tracking future progress. The team started by inventorying the number of buildings and fleet vehicles, and associated energy use and costs. The City of Waupun has seven municipal buildings, or roughly 150,000 square feet of buildings, and an eighth building in the design and construction process. The City also owns 35 fleet vehicles, including police vehicles, dump trucks, pickup trucks, lawnmowers and passenger SUVs or cars. The annual energy use of these buildings and vehicles produces roughly 1,138 metric tons of carbon dioxide (CO2) and costs roughly $227,635. Table 2 provides the breakdown of costs and carbon across each existing building and for fleet. Table 1. Annual emissions and costs by source (2021 data) Source CO2 Emissions (metric tons) Percent of Total Carbon Cost Waupun Aquatic Center 107 9% $16,955 Waupun City Hall 113 10% $17,900 Waupun Community Center 304 27% $48,095 Waupun Heritage Museum 26 2% $4,160 Waupun Public Library 140 12% $22,235 Waupun Public Works Garage 133 12% $21,135 Waupun Safety Building 127 11% $20,155 Fleet 183 16% $77,000 Total 1,138 - $227,635 Using the baseline, the team identified recommendations for fleet conversions, solar installations, and energy efficiency improvements for municipal buildings. In addition to recommendations on direct upgrades, the plan also includes recommendations on internal guidelines or policies that can help institutionalize progress to ensure savings continue. Figure 1 provides the overview of the recommendations by category. The recommendations serve as initial items for consideration to save energy and reduce the carbon impact of the city. Funding is available through local utility rebates, federal funding, and state funding to implement these recommendations. More detail is in the report on funding options for the recommendations. Page 3 Figure 1. City of Waupun Recommended Energy Actions Figure 2 illustrates the potential cost reduction from implementing the recommended measures from this plan. Energy efficiency leads to $13,860 savings, solar installations lead to $13,545 savings, and fleet conversions to EVs lead to $14,260 savings. This amounts to a 18% reduction in cost, or roughly $41,000 savings. Figure 2. Potential cost reduction from recommended actions Energy Efficiency Continue ongoing benchmarking of building performance. Implement recommended measures for audited buildings. Adopt standard operating procedures across buildings. Institute standard purchasing policies for building equipment across all buildings. Solar Install 100-150 kW of solar at city buildings offsetting 15 to 20% of electricity use. Require all new construction for city buildings to be solar- ready. Consider battery installations at time of generator replacement. Fleet Pilot two to three electric vehicles in the municipal fleet. Use the estimated total cost of vehicle ownership to guide vehicle purchasing decisions. Consider how the city can advance municipal and public EV charging. Page 4 Glossary Battery energy storage system (BESS): Equipment that is able to store energy and then release it when needed for use. These are often lithium-ion batteries. Direct pay: A provision in the Inflation Reduction Act that makes non-taxable entities eligible for tax credits for clean energy items (including renewable energy and alternative vehicles) Energy walkthrough: Assesses how a building currently uses energy and identifies opportunities to reduce the building’s energy consumption. Electric vehicle (EV): vehicles; cars, trucks, and buses powered by a battery and electricity Focus on Energy: Wisconsin’s statewide program to increase energy efficiency and renewable energy use among residents, businesses, and local governments. Heat pump: Single heat pump replaces both furnace and an air conditioner; fueled only by electricity and very efficient Internal combustion engine (ICE): Conventional gasoline or diesel vehicles Inflation Reduction Act (IRA): Federal law passed in 2022 that directs significant funding to clean energy and climate solutions. A portion of funding is directed at local governments through rebates or grant programs. Microgrid: A group of interconnected loads and energy resources that can connect and disconnect from the grid. Can operate as part of larger group or on its own. Net metering: Billing mechanism that credits solar energy owners for electricity added to grid Non-taxable entity: An entity that is not required to pay income taxes. Includes nonprofits, local and state governments. PV: Photovoltaic solar energy; converts energy from the sun to electricity Renewable energy: Energy that is generated from a naturally replenishing resource that does not release carbon, such as solar energy, wind energy, or geothermal.   Total cost of ownership (TCO): Total cost of owning equipment, including upfront cost, any energy or maintenance costs, and resale forecast Page 5 Introduction For more than a decade, the City of Waupun has been committed to lowering its energy use and carbon impact. In 2009, the City signed a resolution for a 25% reduction in energy use by 2025. In 2018, the City reconfirmed its commitment with a resolution to reduce energy use in municipal operations by 5% in five years, and then quickly met that goal by upgrading lighting across city buildings. In 2021, the City i dentified the benefit of developing an energy plan that would identify and prioritize energy-saving measures for municipal operation. The City applied for and was awarded a planning grant from the State Office of Energy Innovation (OEI) at the Public Service Commission to complete this work. Over the past year, the City of Waupun worked with Slipstream and Waupun Utilities to compile current energy, building, and fleet data. Slipstream, a nonprofit, served as the technical energy advisor to the City. The project process included collection of energy use from buildings and fleet, compilation of energy data to develop an energy baseline, energy walkthroughs at three city facilities, and analysis of energy data to identify cost-savings opportunities for renewable energy, fleet conversions, and building energy efficiency. This document details the City’s energy plan. It starts with a summary of the baseline energy profile for City of Waupun buildings and fleet. It then provides recommendations for building efficiency upgrades, solar installations on city facilities, and fleet upgrades to electric vehicles. Figure 3. Overview of planning process Data Collection •Electricity and natural gas data for buildings •Gasoline and diesel data •Building equipment lists •Previous actions and goals of energy planning Data Compilation and Building Walkthroughs •Development of energy use, cost, and carbon baseline for city operations •Walkthrough energy audits of city buildings to review equipment Analysis of energy saving opportunities •Analysis of city data to identify cost saving opportunities: •Solar installation •Fleet conversion •Building energy efficiency •Internal policies to drive reductions Page 6 Baseline Data The City of Waupun has seven municipal buildings or roughly 150,000 square feet of buildings, and an eighth building in the design and construction process. The City also owns 35 fleet vehicles – including police vehicles, dump trucks, pickup trucks, lawnmowers and passenger SUVs or cars. The City currently has no renewable energy installations and only owns internal combustion (ICE) vehicles. The energy use of these buildings and vehicles amounts to roughly 1,138 metric tons of carbon dioxide (CO2) emitted a year and roughly $227,635 a year. Table 2 provides the breakdown of costs and carbon across each existing building and for fleet. Table 2. Annual emissions and costs by source (2021 data) Source CO2 Emissions (metric tons) Percent of Total Carbon Cost Waupun Aquatic Center 107 9% $16,955 Waupun City Hall 113 10% $17,900 Waupun Community Center 304 27% $48,095 Waupun Heritage Museum 26 2% $4,160 Waupun Public Library 140 12% $22,235 Waupun Public Works Garage 133 12% $21,135 Waupun Safety Building 127 11% $20,155 Fleet 183 16% $77,000 Total 1,138 - $227,635 The total cost for energy purchases varies across buildings and fleet based on hours of occupancy, efficiency of the building or vehicle stock, cost of the energy, and size of the building or number of vehicles in a category. Figure 4 illustrates the relative cost impact across the two main categories of energy use (buildings in green and fleet in orange). The Community Center/Hockey Rink has the largest energy cost contribution for buildings and police vehicles have the largest contribution across all fleet. Figure 4. Annual energy cost impacts of City buildings and fleet Page 7 Recommendation Overview Slipstream analyzed potential opportunities to lower energy use, reduce carbon emissions, and save money across fleet conversions, solar installations, and energy efficiency improvements in city buildings. For each of these areas, the team identified recommendations for near-term installations or upgrades and recommendations for ongoing internal policies for purchasing, new construction, and operations. The recommendations focus on both near-term upgrade opportunities and ways to institutionalize progress to ensure savings continue into the future. The recommendations are split into three primary categories – energy efficiency upgrades, solar upgrades, and fleet upgrades or conversions. We recommend the City prioritize a few upgrades each year starting with the following: - Install priority energy efficiency measures for buildings over the next two years. - Install solar at one or two buildings in the next couple of years. Prioritize a building where demonstration to public is also possible (Waupun Library or City Hall). - Purchase electric vehicles for two to three large passenger vehicles in the next two years. - Begin to develop and institute standard operating and purchasing guidelines to help institutionalize the plan and City’s commitment to these efforts. Figure 5 provides the overview of the recommendations by category. The following sections of the report provide into more detail on each of the recommendations. Funding opportunities for each of the recommendations are also presented in detail. Figure 5. City of Waupun Recommended Energy Actions Energy Efficiency Continue ongoing benchmarking of building performance Implement recommended measures for audited buildings. Adopt standard operating procedures across buildings. Institute standard purchasing policies for building equipment across all buildings. Solar + Energy Storage Install 100-150 kW of solar at city buildings reaching 15 to 20% of electricity use. Require all new construction for city buildings to be solar- ready. Consider battery installations at time of generator replacement Fleet Pilot two to three electric vehicles in the municipal fleet. Use the estimated total cost of vehicle ownership to guide vehicle purchasing decisions. Consider how the city can advance municipal and public EV charging Page 8 Figure 6 illustrates the potential cost reduction from implementing the recommended measures from this plan. Energy efficiency leads to $13,860 savings, solar installations lead to $13,545 savings, and fleet conversions to EV’s lead to $14,260 savings. This amounts to a 18% reduction in cost, or roughly $41,000 savings. The energy efficiency reduction includes all savings from recommended end-of-life equipment replacements, fleet reduction includes savings from transitioning all vehicles with eligible alternatives to EVs, and solar reduction includes installation of all recommended arrays. Figure 6. Potential cost reduction from recommended actions Figure 7 illustrates the potential CO2 reduction from implementing the recommended measures from this plan. Energy efficiency installations leads to 122 metric tons of savings, solar installations lead to 138 metric tons of savings, and fleet conversions leads to 22 metric tons of savings. This amounts to a 25% reduction in carbon, or 282 metric tons of savings. As Waupun Utilities continues to transition to renewable energy and more vehicles and building equipment transitions to electricity, further reductions in CO2 emissions will be possible. Figure 7. Potential CO2 reduction from recommended actions Page 9 Energy Efficiency Recommendations Recommendation 1: Continue ongoing benchmarking of building performance The energy performance of buildings can be tracked by examining energy use intensity over time or in comparison to other buildings, through a process called benchmarking. Energy use intensity (EUI) is a metric that shows the building’s total energy use divided by square feet of the building and provides a standard approach to examine the energy performance of a building. Figure 8 illustrates the energy use intensity of all Waupun city buildings over time and compared to the median energy use intensity of similar buildings in the climate zone. The Aquatic Center is not included in the graph as it is difficult to normalize a pool’s energy use using square feet data. In general, the buildings all perform well compared to the median energy use intensity for similar types of buildings and are relatively consistent over time. The Community Center performs slightly worse than the median EUI – which likely reflects its joint operation as a hockey rink and the high electricity use from the rink. For the other buildings, the strong performance of the EUIs reflects the recent efforts by Waupun to lower energy use across buildings but does not suggest that there are not further opportunities to lower energy use and save money. Figure 8. Energy use intensity of city facilities compared to median energy use intensity of similar buildings in same climate zone Continuing to benchmark the City’s buildings over time is a key mechanism to address unexpected changes in energy use, identify maintenance needs, and measure progress toward energy saving goals. EnergyStar Portfolio Manager is a free tool that provides a centralized location for data collection and the ability to benchmark against a national sample of similar building types. The City of Waupun started adding data to the website during this project timeline and the project team recommends that the City continue adding data at least annually to the tool. 0 20 40 60 80 100 120 City Hall Public Works Garage Community Center Heritage Museum Public Library Safety Building Energy USe Intensity (kBtu/sf) 2018 2019 2020 2021 Regional Median Site EUI (kBtu/ft²) Recommendations Continue benchmarking building energy performance. Implement recommended measures for buildings to achieve near-term savings. Adopt standard operating procedures across buildings. Institute standard purchasing policies for building equipment across all buildings. Page 10 Recommendation 2: Implement recommended measures for walkthrough buildings The project team performed energy walkthroughs at two buildings, the Safety Building and the Library. The team also examined City Hall’s heating system. Slipstream then developed energy models to provide a representative assessment and estimate savings opportunities. The models were informed by onsite review of equipment, the condition of the facilities, code requirements at time of construction, and typical meteorological year weather data. Measure costs were based on past project experience, secondary research, and industry reference materials. These estimates intend to inform prioritizing improvement measures. Actual energy savings from the recommended improvements will be highly dependent on the weather and actual building operation costs. Further engineering and final pricing of all recommended measures will be required prior to implementation. New LED lighting was installed in all City buildings in 2019. Based on our walkthrough of the buildings, building systems seem well maintained, although some equipment is near end-of-life and should be replaced. Table 3 illustrates the recommended measures across the three audited buildings. The measures are organized by high priority vs end-of life (EOL) priority. The high priority measures are items with short payback periods or significant savings. End-of-life are upgrade recommendations for when equipment reaches replacement age. A maintenance refresh is installation of low to no-cost items like new filters, air sealing around windows or doors, or installing weatherstripping. Table 3. Overview of recommended measures CITY HALL LIBRARY SAFETY BUILDING PRIORITY Steam trap review/study Steam pipe insulation Maintenance refresh Low flow plumbing fixtures Maintenance refresh Limit electric space heaters Low flow plumbing fixtures Retro-commissioning END OF LIFE Upgrade steam boiler system. Upgrade building insulation Air sealing Upgrade windows Upgrade HVAC units ENERGY STAR appliances Upgrade windows Upgrade HVAC units ENERGY STAR appliances Table 4 details the upfront cost, annual cost savings, payback period, and annual CO2 savings. The upfront cost is estimated and does not include incentives. It is recommended that the City discuss potential incentives with their Focus on Energy representative. Payback period is calculated as total upfront cost divided by annual cost savings. The end-of-life measures payback period is not included as it depends on incremental cost compared to the other option being considered at replacement time. The library’s high cost is reflective of a higher window replacement cost and added cost for wall insulation, both at EOL. The high cost for City Hall reflects the complexity of the steam boiler replacement. It is an estimated cost, and the historic characteristics of the existing system may increase these costs significantly. Appendix 1: Individual Building Results has a full description for each walkthrough building. Table 4. Cost and carbon savings from recommended measures Upfront Cost ($) Annual Energy Cost Savings ($) Percent Cost Savings Annual CO2 Savings (tons) Percent CO2 Savings Average Payback Library >$345,350 $5,600 17% 36.3 29% - Priority Measures $50 $270 1% 1.6 1% <1 year EOL Measures >$345,300 $5,330 16% 34.7 28% - Safety Building $60,400 $3,300 16% 21.1 16% - Priority Measures $10,700 $2,600 13% 17.2 13% 3 years EOL Measures $49,700 $700 3% 3.6 3% - City Hall >$556,400 $4,000-$6,100 18%-28% 45.3 – 65.0 34% - 49% - Priority Measures $6,400 $4,000 18% 29.6 22% 2 EOL Measures >$550,000 $0-$2,100 0%-10% 15.8 - 35.5 12% - 27% - Page 11 Recommendation 3: Institute a standard operating policy at all buildings The operation of a building and the behavior of building occupants, has a significant impact on building energy use. Operational policies can have impacts beyond energy use, most notably the potential to impact occupant comfort and productivity. We recommend that City of Waupun develop policies that define clear rules and standards for the operation of municipal buildings. These types of policies are a way to potentially save energy without spending money on new equipment or controls. However, they need to find the right balance between energy performance and occupant comfort and safety. To that end, we recommend that along with operational policies, the City of Waupun set up the appropriate communications channels so that building occupants can provide ongoing feedback. Figure 9 provides a full list of items to consider for an operating policy. In the walkthroughs at the City of Waupun, we identified a few areas where standard operating procedures could lead to potential savings. One item to highlight is establishing setpoints and setbacks for occupied and unoccupied times. Some buildings already follow this practice but instituting across buildings could lead to additional savings and ensure that the policy continues to be followed through potential staff changes. Another recommendation is to consider how many individual pieces of equipment are in offices and consider if there are ways to consolidate or eliminate some pieces of equipment. For example, as improvements in heating comfort at buildings are made, the removal of space heaters can reduce electricity use in the winter. Figure 9. Operating policy examples Maintenance Follow regular maintenance schedule for buildings and equipment. Change air filters on regular basis. Ensure air-conditioning units maintain refrigerant charge. Heating, ventilation, and air conditioning (HVAC) systems Establish temperature setpoints and setbacks for occupied and unoccupied times. Keep a list of operating parameters, including the temperature set points and operating schedule for each piece of equipment. Keep the list in a visible location to make sure equipment is programmed correctly. Post guidance on when operable windows can be opened based on room thermostat setpoints. For example, assuming thermostats are set from 70 degrees to 75 degrees, building occupants should have clear direction that they can opened windows between 68-77 degrees outdoor temperature. Create communication channels for building occupants to provide feedback on comfort or operational issues. A regularly administered survey can be useful to gather additional feedback on occupant comfort. Plug loads Develop a policy that prohibits or limits the use of individual fridges, space heaters, printers, and other peripheral equipment at workstations. Consider ways to consolidate the number of fridges and printers across the building. Implement computer power management on staff computers using a 30 minute or less delay before putting computers to sleep. Implement TV sleep requirements to ensure TVs are not running all day. Lighting Promote or incentivize occupants to turn off switched lights when not in use. Operational Policies Page 12 Recommendation 4: Institute a standard purchasing policy for future upgrades at all buildings There are opportunities to increase building efficiency with any new piece of equipment that uses energy. In limited cases, it may make sense to upgrade equipment early; but more importantly, the decision at replacement is important and impacts energy use for decades. We recommend that purchasing policies be put in place such that all municipal employees that are responsible for purchasing such equipment have a clear guideline as to what is an acceptable purchase to meet the municipal energy goals. Figure 10 summarizes the purchasing recommendations. Electrification Considerations Electrification is the process of phasing out equipment that uses fossil fuels (i.e., natural gas, propane, gasoline, and diesel fuel) with equipment that uses electricity. For Waupun, this is appliable to heating systems and water heating systems in most buildings. The main benefit of electrification is a reduction in CO 2 emissions compared to fossil-fuel equipment. CO2 emissions from electric equipment will continue to drop as the electric grid becomes cleaner while gas equipment will maintain a constant emissions rate throughout time. Historically, heat pumps have been more expensive than high-efficiency natural gas systems. However, state and federal incentives and changing energy costs are causing heat pumps to become more cost competitive. As the costs on heat pumps continue to drop, the City should consider heat pumps as an option for future HVAC and water heating upgrades. The City should review the incentives available, the resulting overall cost and CO2 differential between heat pumps and natural gas systems when replacing existing equipment. Table 5 lists the heat pump options for existing systems across Waupun buildings. It’s recommended to start with furnace split-systems and potentially the City Hall boiler. Table 5. Heat pump system options for existing systems in Waupun buildings Existing System Heat Pump System Notes Furnace and A/C Split System Dual-Fuel Air-Source Heat Pump A cost-effective electrification option that still uses gas but electrifies heating at temperatures above 25°F. Air-Source Heat Pump Full electrification option. Steam Boiler System Air-Source Variable Refrigerant Flow (VRF) Suitable for historic retrofit applications. Geothermal heat pump system Requires land for geothermal bore field. Inflation Reduction Act offsets 30% to 50% of the cost. Single Zone RTU Heat-Pump RTU Emerging technology. Figure 10. Purchasing policy example items Heating, ventilation, and air conditioning (HVAC) systems Consider installation of air source or dual-fuel heat pumps to replace HVAC systems. Install a minimum of condensing furnaces and boilers with efficiency higher than 95%. Install a minimum of ENERGYSTAR certified AC with SEER2 ≥15.2. Refer to CEE Tiers for energy efficient equipment for larger cooling equipment like RTUs. Install smart thermostats with occupancy sensors to setback temperatures. Consider installing or upgrading the building automation system when replace major equipment. Appliances and other equipment Purchase ENERGY STAR equipment to replace office equipment and water heaters. New windows should meet or exceed ENERGY STAR requirements. Large commercial windows or store front windows should target U-value of 0.3 and SHGC of 0.25. Consider replacing water heaters with hybrid electric water heaters. Lighting Consider addition of daylighting and occupancy controls for LED systems. Purchasing Policies Page 13 Renewable Energy Recommendations Recommendation 1: Install 100 – 150 kW of solar at city buildings Solar energy installations are a cost-effective way to reduce carbon emissions and generate cost savings for the City. The analysis examined all City buildings for solar installations and identified four buildings that were good candidates for solar installations. The analysis incorporated available space at each building, hourly historical data for the building, and the current utility rates. Table 6 provides the solar array capacity recommendations, percent renewable electricity for each site that the system would generate, and a simple payback period. The solar array size is determined by examining available roof space, hourly energy use of the building, and cost effectiveness. The payback period is calculated by dividing yearly utility bill savings by the net upfront cost. The annual cost savings represent utility bill savings. Both the energy cost savings and payback period are demonstrated as a range – the low value assumes current electric rates and high value applies a 1% increase yearly. The CO 2 savings represent annual emissions avoided. Table 6.Solar PV installation recommendations for Waupun city buildings Building Size (kW dC) Percent Renewable Electricity Payback (Years) Annual CO2 Savings (metric tons) Annual Energy Cost Savings City Hall 26 42% 12.6 - 14.4 20 $2,906 - $3,316 Library 45 38% 13 - 14.9 41 $2,894 - $3,302 Public Works 43 45% 14.5 - 16.6 39 $3,524 - $4,021 Safety Building 26 22% 15.8 - 18 19 $4,222 - $4,817 The costs for each of the solar installations are in Table 7. The estimated upfront cost is $2,500 per kW for solar installations but it should be noted that only final bids can give actual costs for each installation. The Focus on Energy incentives represent local utility incentives available for installations of solar and is based on the size (generating capacity) of the solar array. Cities are eligible for the Inflation Reduction Act tax credits through elective pay, a provision that allows non-taxable entities to receive clean energy tax credits (see Funding Opportunities for Recommendations). The credit is 30% of the total upfront cost. Net cost represents total cost after the state incentives and tax credit is applied. Table 7. Cost details of solar PV installations for Waupun city buildings Buildings Total Upfront Cost Focus on Energy Incentives IRA Tax Credit Net Cost City Hall $65,000 $3,750 $19,500 $41,750 Library $112,500 $6,125 $33,750 $72,625 Public Works Garage $108,539 $5,927 $32,562 $70,050 Safety Building $65,000 $3,750 $19,500 $41,750 The full recommendations for each building, including placement of solar panels and input details are included in Appendix 2: Solar Methodology and Details. Recommendations Install 100-150 kW of solar at city buildings to generate 15 to 20% of the City’s electricity use. Require all new construction for city buildings to be solar-ready. Consider battery installations at time of generator replacement. Page 14 Recommendation 2: Require all new construction for city buildings to be solar-ready. Design characteristics of buildings – such as orientation, available roof space, and roof type – greatly impact the feasibility of future solar installations on a building. A solar-ready building is designed to minimize costs and optimize production of a future solar installation. The added design requirements often add minimal, if any, construction costs for a new building. The main design recommendations are listed below and can be integrated into design requirements for the construction or design firms1: 1. Avoid shading over portions of the roof with potential southern exposure during peak sunlight hours, if possible 2. Minimize and/or cluster equipment on rooftop to ensure space is available for solar panels 3. Prioritize making roof space available for south-facing portion of roof 4. Consider roof type to ensure it can carry extra load from solar panels 5. Determine mounting strategy and feasibility 6. Place electrical panel near future PV location and keep breaker free for PV circuit 7. Consider running electrical conduit from electrical panel to future PV location 8. Plan locations for inverter components 1 L. Lisell. 2009. “Solar Ready Buildings Planning Guide.” https://www.nrel.gov/docs/fy10osti/46078.pdf Page 15 Recommendation 3: Consider battery energy storage systems at generator replacement. Fossil fuel generators have been the most common solution for resiliency needs at a building because of their ability to run during power outages and relatively low upfront costs. However, generators alone often are restricted by code from running during normal operations. Instead, battery energy storage systems (BESS) paired with solar PV, operating as a microgrid, are increasingly used as the primary backup system because they provide benefits during normal operations and provide backup power during emergencies. The inclusion of solar PV with the battery allows for recharging of the battery during grid outages, and for additional energy cost savings during normal operations. The U.S. Department of Energy (DOE) defines a microgrid as “a group of interconnected loads and distributed energy resources within clearly defined electrical boundaries that acts as a single controllable entity with respect to the grid. A microgrid can connect and disconnect from the grid to enable it to operate in both grid- connected or island-mode.” 2 The primary concern with BESS is cost. As costs continue to decline, BESS is becoming a viable option especially for new construction or at generator replacement. From 2010 to 2018, battery prices fell by 85%, and costs are predicted to continue to decline at a rate of 18%. 3 The U.S. National Renewable Energy Lab (NREL) estimates that a BESS costs $388 per kWh of energy and $775 per kW of capacity, compared to a diesel generator at $500 per kW of capacity.4 For a BESS, the per kW and per kWh costs are additive– a one kW, one kWh battery would cost approximately $388 plus $775, or $1,063. As costs continue to fall, microgrids are important to consider when replacing a generator or constructing a new building. Figure 11 includes a checklist for items to consider at time of generator replacement. Figure 11. Microgrid considerations checklist 2 Ton and Smith, “The U.S. Department of Energy’s Microgrid Initiative.” https://www.energy.gov/sites/prod/files/2016/06/f32/The%20US%20Department%20of%20Energy%27s%20Microgrid%20Initiative.pdf 3 Goldie-Scot, “A Behind the Scenes Take on Lithium-Ion Battery Prices.” https://about.bnef.com/blog/behind-scenes-take-lithium-ion-battery-prices/ 4 S. Mishra et al., “The ReOpt Web Tool User Manual,” 2021. https://reopt.nrel.gov/tool/reopt-user-manual.pdf At time of generator replacement or purchase, compare upfront equipment costs, ongoing operation and maintanance costs, the potential energy and demand cost savings, and performance requirements to determine best option. Consider batteries where backup power is needed Similar to solar-ready, microgrid-ready design spreads out costs and ensures a building is ready for a battery in the future. Key considerations include physical space for a battery and making sure solar inverters are compatible if solar is installed first. Utilize microgrid ready design during renovations and construction When sizing a BESS, the baseline load is the single most important factor. If there are ways to decrease total energy use through energy efficiency and demand management, this can allow for a smaller and less costly system. Consider energy efficiency and demand management to decrease solar and storage capacity needs The length of outage for the system to cover is a key input in determining backup system size. It’s important to think through functions of the building and how those relate to number of hours a system should cover. Consider length of outage system needs to cover The amount of load that must be sustained during an outage is a key factor in the size of storage required. Stakeholders familiar with the building load and needs can estimate which functions should be considered critical load. When sizing DER components, determine the critical loads at the facility Page 16 Fleet Recommendations Recommendation 1: Pilot 2-3 Electric Vehicles in Municipal Fleet The City of Waupun’s current fleet includes 17 gasoline-powered vehicles and 15 diesel-fueled vehicles. Table 8 shows fuel use, miles driven, and miles per gallon in 2021 across seven vehicle categories. It excludes fuel use for off-road equipment. Police vehicles include small and mid-sized SUVs. These vehicles were grouped together to reflect the unique use patterns and shorter replacement schedules. Table 8. City of Waupun fleet vehicle baseline Category Number of Vehicles Fuel Purchased (gallons) Fuel cost Emissions (metric tons CO2) Miles Driven Avg MPG Large Sedan 2 597 $2,135 5.1 15,750 26.4 Large SUV 1 475 $1,699 4.0 5,795 12.2 Full-size Pickup 4 1,116 $3,992 9.5 15,774 14.1 Heavy Duty Pickup 9 2,674 $10,958 26.1 26,954 10.1 Police SUVs 8 8,330 $29,798 71 120,107 37 Large Truck 7 2,361 $10,102 24.1 13,753 5.8 Street Sweeper 1 1,114 $4,766 11.4 3,316 3.0 Total 32 20,173 77,000 183 201,449 12.0 EVs offer several advantages compared to diesel or gasoline vehicles (see sidebar). EVs have similar performance capabilities as gasoline vehicles and the range of new EVs satisfies most city needs. Typical daily mileage for most City vehicles is less than 40 miles and most EVs can drive over 200 miles before they need to be recharged. Therefore, assuming that City vehicles rarely travel more than 200 miles per day, City vehicles may primarily be charged when off-duty. To identify alternatives to save money and reduce emissions compared to the existing vehicles, the project team focused on opportunities for Waupun to replace its existing cars and trucks with EVs. To ease into the transition to EVs and address potential concerns about driving and maintaining an EV fleet, the project team recommends that the City of Waupun start by replacing 2-3 existing vehicles ready for replacement with EV alternatives. This pilot approach would include three components: 1. Replace a limited number of vehicles in the City’s existing fleet with EV alternatives. 2. Install EV charging stations to fuel the vehicles in the pilot 3. Train staff to drive and maintain EVs, as applicable. During the 12–18-month pilot period, the City will track the cost and amount of electricity used to charge the EVs, the maintenance requirements, and any feedback from drivers on their experiences driving the cars. The City can use this information to guide how it adds more EVs into its municipal fleet in the future. Recommendations Pilot 2-3 electric vehicles in the municipal fleet. Use estimated total cost of vehicle ownership to guide purchasing. Consider how the City can advance municipal and public EV charging. Benefits of EVs Lower fuel cost ($/mile) than gasoline or diesel vehicles. Maintenance costs 50% lower compared to gasoline or diesel vehicles. Reduce CO2 emissions 40% - 55% with current electricity mix. Lower energy use while idiing reduces engine wear and saves money Page 17 Pilot Component 1: Replace existing fleet vehicles with EVs The first component of the pilot is to replace 2 to 3 existing vehicles with EV options when the current vehicles reach replacement age. The project team analyzed fleet data to identify which vehicles have cost-competitive electric options compared to conventional vehicles, are near-replacement age, and had similar performance capabilities of gasoline vehicles. The project team started by reviewing available EVs to determine which vehicle categories have market-ready EV alternatives, and then calculating incremental cost and payback periods to identify which categories are feasible for adoption in the near-term. More details on this analysis methodology are available in Appendix 3: Fleet Analysis Methodology. Table 9 shows the four vehicle categories in Waupun’s fleet for which EVs are available and are currently cost- competitive with gasoline-powered alternatives. The current vehicle column shows an existing vehicle in that category in Waupun’s fleet, and the new gasoline vehicle benchmark lists the approximate cost and fuel efficiency rating for a new conventional vehicle in the same category. The EV incremental cost is the difference between the cost of the new conventional vehicle and the cost of the corresponding EV. It includes the expected reduction in cost from Inflation Reduction Act credits (up to $7,500) for each vehicle.5 The cost savings per mile is the reduced per mile cost of fueling and maintaining the EV instead of the conventional vehicle. Miles for financial payback indicates the number of miles and years after which the cumulative benefit of the lower cost of driving the EV would surpass the higher cost of purchasing the EV. Table 9. Potential EV Alternatives by Vehicle Category Category Current Vehicle New gasoline vehicle benchmark Ex. EV Alternative EV Incremental Cost Cost Savings/Mile Miles for Financial Payback Large Sedan Chevrolet Impala 31 mpg $30,933 Ford Mach-E $4,600 $0.088 52,000 Large SUV Chevrolet Tahoe 17 mpg $54,200 Mazda CX-90 PHEV $0 $0.143 0 Police Patrol Ford Explorer 20 mpg $41,800 Ford Lightning Pro SSV6 $10,700 $0.123 87,000 (~5.5 years) Full-size Pickup Chevrolet Silverado 1500 20 mpg $41,800 Ford F150 Lightning $8,500 $0.123 70,000 (~17.7 years) Based on this analysis, commercially available EVs in the four categories shown in Table 9 could replace 47%t of the City’s on-road vehicles. Nine Waupun vehicles are 11 or more years old and are in a category for which a cost-competitive EV is available. Instead of an immediate full transition, the Project team recommends initially purchasing 2-3 EVs through the City’s regular vehicle replacement process and collecting data and stakeholder feedback to inform how it transitions additional vehicles. Potential candidates for replacement with an EV include a 2008 Chevrolet Impala (large car), a 2003 Chevrolet Silverado 1500, and a 2016 Ford Explorer, used as a police patrol vehicle.7 Replacing the three vehicles recommended for the pilot with the corresponding EV alternatives shown in Table 9 would generate $3,180 in annual operating cost savings and avoid 4 tons of CO2 emissions. This amounts to roughly an over 50% reduction in costs and almost a 35% reduction in emissions. The emissions reduction would be even larger with the addition of solar at the buildings. If outside factors prevent one or more of the recommended vehicles from being replaced with an EV, other similar vehicles owned by the City should be considered. 5 The value of any available Federal tax credits are applied to the EV MSRP to calculate the EV incremental cost. 6 Based on feedback from City of Waupun, we model an option for replacing police vehicles with F150s. Another option is to replace with Ford Mach- E SUVs. 7 Due to demand vehicle use patterns and high-performance requirements, police patrol vehicles have a shorter vehicle replacement cycle compared to other types of vehicles. Page 18 Pilot Component 2: Install EV Charging Stations The City will need to install adequate EV charging stations so that its vehicles can be sufficiently charged to meet their daily service requirements. Level 2 charging stations require 240V electric service and can fully charge a vehicle in 4-10 hours, depending on the battery capacity of the vehicle. Level 1 chargers use standard 120V electric service, but are unable to fully recharge a battery overnight, while Level 3 chargers can fully recharge a vehicle in less than 30 minutes but are much more expensive than Level 2 chargers. Table 10 summarizes the three levels of EV charging stations. The costs shown for Level 1 and Level 2 chargers in Table 10 indicate typical ranges for the combined cost of the station hardware, electrical upgrades, and electrician labor to install each EV charging port. The hardware cost for Level 2 charging stations is modest; however, installing conduit between existing electrical panels and the location of the charging station and upgrading electrical service (if necessary) can add complexity and expense to installing the stations. Due to the wide variation in the costs of installing the high voltage electrical service for Level 3 stations, the cost listed for Level 3 stations only represents the material expenses. Table 10. EV Charging Station Types Charger type Range miles per charging hour Uses Installed cost per port (est.) Level 1 (120V AC) ~5 Home charging ~$1,200 - $1,500 Level 2 (240V AC) ~25 Home, workplace, and public charging (most common) ~$1,500 - $4,200 Level 3 (DC) 200+ Public charging; transportation corridors ~$20,000 - $150,000 (Hardware only) Based on the understanding that the pilot vehicles will typically be off-duty overnight, we recommend installing Level 2 chargers at the Safety Building and at the DPW Garage. In planning for EV chargers at these locations and other municipal facilities in the future, the project team recommends the following: - Assess total future electrical service needs when upgrading for new vehicle charging stations. When planning for any electrical service upgrades or laying of new conduit, assess total potential electric vehicles that may be stationed at the location and the corresponding associated number of charging stations needed. Support long-term cost savings by including future needs in current upgrade plans. - C onsider how many vehicles a single charger can support. In Waupun, average daily miles driven for vehicles recommended for replacement suggests that EV alternatives may not require daily charging,8 thus allowing one level 2 charging station to support two or three EVs. However, the City may choose to plan for a worst-case scenario and install one level 2 charger per EV that it purchases so that all vehicles can charge simultaneously. 8 Statement is based on a finding that the average miles driven per workday for most City vehicles is less than half of the advertised driving range between charges for typical EV models. Page 19 Pilot Component 3: Train city staff to drive and maintain electric vehicles City staff who drive an EV during the pilot may have questions about the vehicle’s driving range, how to charge the vehicle, when the vehicle should be charged, and any differences between driving an EV and driving a conventional vehicle. To help answer these questions, the City should identify an EV ambassador - either a staff person or a dealership representative. The ambassador can provide a brief EV orientation to discuss the benefits of the vehicles and answer any remaining questions. After the pilot, those staff who drove the pilot EV may take on the roles of “EV ambassador” as additional staff start using the electric vehicles. The City should prepare a draft of an internal policy document that outlines rules for using the EVs. At a minimum, the rules and supporting materials should provide for: • Prohibiting non-EVs from parking at municipal charging stations. • The conditions (level of charge, frequency, time of day, other) under which a driver should charge a vehicle after use. • A map of public charging stations in the Waupun area. The City may also consider creating an account with a public charging station provider, such as Plug Share or Charge Point to facilitate accounting for charging municipal vehicles at public charging stations. • Protocols for tracking and allocating costs for electricity used to charge vehicles. • Procedure for reimbursing driver expenses for use of non-municipal charging stations, when needed. EVs have fewer moving parts than gasoline or diesel vehicles and require less maintenance. City staff who maintain vehicles may be able to reduce time spent on routine maintenance as Waupun adopts EVs. However, to help alleviate concerns from maintenance staff, we recommend that the City’s vehicle maintenance staff receive education on this topic. Most EV manufacturers offer training on maintaining electric vehicles and how it differs from ICEs. As another point of training and education, Waupun may benefit from contacting other municipalities in Wisconsin that have successfully introduced EVs into their fleets. For example, the City of Madison has emerged as a leader in transitioning its fleet from gas and diesel vehicles to electric models and often offers opportunities for other cities to test their vehicles or discuss EV experiences. Page 20 Recommendation 2: Use estimated total cost of vehicle ownership to guide purchasing The analysis of Waupun’s fleet identified 15 vehicles for which there are cost-competitive EV options that would save the City money in the long-run and reduce emissions. In addition, the EV market is rapidly changing with new models being announced frequently and the cost of new EVs decreasing. To reflect this changing market and the benefits of EVs, we recommend that the City adopt a vehicle purchasing policy so that it prioritizes selecting vehicles that offer the lowest total cost of ownership (TCO), rather than the lowest purchase price, while still meeting the City’s performance requirements for the vehicle. A TCO-based purchasing policy will ensure that future decisions about fleet transitions reflect the changing costs of EVs vs ICEs and the long-term operational cost savings potential of EVs. The analysis should incorporate the following components: - Upfront cost differential - Ongoing fuel costs: cost to charge an EV vs. cost to purchase gasoline or diesel needed for an ICE - Maintenance costs - Forecasted resale values of both vehicles Table 11 summarizes which vehicle has the cost advantage across factors. Table 11. EV vs conventional vehicle cost comparisons - upfront and operating Cost of Ownership Factor Advantage? Purchase Cost Cost differentials between EV and conventional vary by vehicle category Fuel Cost Fuel cost per mile lower for EVs than for all conventional vehicles Maintenance Cost Studies show approximately 50% lower maintenance costs for EVs. 9 Resale Value Some analyses have shown higher resale value for EV, but irregularities in markets for all vehicles from 2020 – 2023 create uncertainty. A TCO purchasing policy will gradually lead to adoption of EVs across vehicle types. Table 12 shows the annual operating cost saving and emissions reduction potential of replacing eligible vehicles with EVs that have a lower TCO than conventional vehicles. The operating cost savings value includes savings from both reduced fuel costs and reduced maintenance expenses. The CO2 savings represent around 12% of all fleet emissions, and fuel cost savings alone represent close to 18% savings compared to all current fuel costs. The CO2 savings would be larger if vehicles were charged using renewable energy. Table 12. Potential annual savings from adding EVs to City fleet Vehicle category Operating Cost Savings CO2 Emissions Savings Large Car $1,465 1.7 Large SUV $825 1.0 Police $14,755 16.9 Full Size Pickup $1,940 2.2 Total $18,985 21.8 Another way for a municipal fleet to save money is to optimize the total number of vehicles in the fleet. For example, there are several vehicles in the City fleet that are driven less than 5,000 miles per year. Low annual mileage may create opportunities for Waupun to use fewer vehicles to complete the same set of services. To implement this in practice, at the time of purchasing, the City should review the proposed use of the vehicle, as well as the actual use of other similar vehicles to determine whether uses may be consolidated into a single vehicle. A new vehicle would only be purchased if leaders determined that the services for which the proposed vehicle would be used could not be performed with an existing vehicle in the fleet. 9 Harto, C. Electric Vehicle Ownership Costs: Chapter 2 – Maintenance. Consumer Reports. September, 2020. (https://advocacy.consumerreports.org/wp-content/uploads/2020/09/Maintenance-Cost-White-Paper-9.24.20-1.pdf) Page 21 Recommendation 3: Consider how the City can advance municipal and public EV charging Use EV-ready guidelines during municipal construction or renovation Adding electric vehicles to the City of Waupun’s fleet will require the City to install adequate EV charging infrastructure at its facilities. Based on the types of EVs that the City may add to its fleet and the use patterns (daily miles driven and times of use), the City will most effectively meet its EV charging needs by installing Level 2 charging stations. Rather than laying conduit and upgrading electrical service as needed to meet increasing charging needs, the City can reduce costs by including EV-capability or EV-readiness into the plans for all new municipal facilities and into any renovations of existing municipal facilities. For each municipal new construction and renovation project, the City should evaluate the total number of light duty municipal fleet vehicles that may regularly be parked at the facility, which translates into number of stations. After determining the number of charging stations needed, the City may incorporate an appropriate number of EV-capable and EV-ready parking spots into facility plans so that it can avoid additional costs in the future for piecemeal electrical upgrades to meet growing need for EV charging stations. Work with partners to install public charging for residents and travelers Currently, there are two public charging stations in the City and the two next closest stations are in Beaver Dam and Mayville. As more Waupun residents purchase electric vehicles, there may be increasing demand or expectations for public-facing charging stations at some municipal facilities and at other publicly-available locations in the community. EV charging stations are being installed by a variety of partners across the United States – private businesses, state and local governments, and utilities. The project team identified several ways that the City can support development of robust public charging infrastructure in Waupun. - Engage with Wisconsin DOT to optimize their placement of EV chargers near Waupun. The Wisconsin Department of Transportation approved the Wisconsin Electric Vehicle Infrastructure (WEVI) Plan in September 2022. The WEVI plan identifies U.S. Hwy 151 exits 144 and 146, near Waupun as gaps in current EV charging infrastructure in the State’s transportation corridors and therefore future priorities. The City should engage with the Wisconsin DOT to ensure placement encourages travelers to stop in Waupun for charging. This can lead to additional visits at local restaurants, grocery stores, and retail locations. - H ighlight EV charging infrastructure incentives for residents or businesses. Most residents in Waupun will primarily charge at home or work. Waupun Utilities offers a $250 incentive for fast EV charging that should be highlighted for residents and businesses. - C ons ider appropriate areas for installations of chargers. Municipal facilities that residents visit for an extended period, such as the library and the aquatic center, may be ideal locations for public charging stations. Additionally, encourage chargers close to multifamily buildings as those residents likely have the lowest ability to add a charger in their home. - Wor k with partners to determine and install an adequate mix of level 2 and 3 charging. A mix of Level 2 and 3 charging across the City is the ideal charging infrastructure. Level 3 chargers are essential for long-route drivers that may be passing by Waupun while Level 2 chargers are ideal for in-town drivers. Level 3 chargers should be located close to Highway 151 or close to retail and restaurant locations in the City, while Level 2 chargers should be close to multifamily housing and at places residents usually spend an hour or more. We would also encourage the City to reach out to organizations like Electrify America and ask them to consider adding Level 3 charging stations within the City limits. EV-Capable: there is sufficient electrical panel capacity for a charging station with a dedicated branch circuit and a continuous raceway from the panel to the future EV parking spot EV-Ready: there is adequate electrical panel capacity and raceway with conduit, ending at a junction box or 240V outlet at the EV parking location Page 22 Funding Opportunities for Recommendations The cost of the upgrades identified in this energy plan is substantial and may be a barrier to implementing some of the recommended measures. This section is intended to provide an overview of funding opportunities for the various upgrades identified in the report. Inflation Reduction Act The Inflation Reduction Act (IRA) represents an unprecedented amount of funding for energy and climate actions. The IRA channels a substantial amount of its funding through tax credits and rebates for renewable energy and fleet. Through this funding, it also includes a provision, direct pay, that makes non-taxable entities eligible for the tax credits. The alternative vehicle tax credits have a limit per vehicle but there are no limits on total amount of projects rebated in a year or total amount of money the City can receive in a year. All credits are available starting for any projects implementing in 2023 and extend to 2032. One item to point out is that commercial vehicles must be purchased from a qualified manufacturer. 10 This is less restrictive than the requirements for residential purchases of EVs. Table 13. Eligible Tax Credits for Direct Pay Renewable Energy Alternative Vehicles Energy Plan Items Solar installations Geothermal Electric vehicle or PHEV purchases Amount 30% of upfront cost 30% of vehicle cost (or 15% for PHEVs) or incremental cost compared to ICE Limit - $40,000 for vehicles over 14,000 lbs $7,500 for vehicles under 14,000 lbs Bonus 10% if meets domestic content requirements for steel and iron - Restrictions - From a qualified manufacturer The IRS has recently released initial guidance on how entities can receive direct pay. The set of steps are listed below. More guidance is expected to be released by the end of 2023. The City of Waupun should work with a tax expert once they identify a project they would like to install. Figure 12. Inflation Reduction Act direct pay – steps for receiving credit 10 A list of qualified commercial vehicles is here: https://www.irs.gov/credits-deductions/manufacturers-for-qualified-commercial-clean-vehicle-credit Page 23 Focus on Energy and Local Utility Incentives Waupun Utilities participates in Focus on Energy statewide incentives for renewable energy installations and energy efficiency upgrades and installations. It’s recommended that the City provide a copy of this report to its Energy Advisor and ask for assistance in identifying the best way to access rebates. The amount available determines on the measure and often specific characteristics of the equipment, such as the size of the solar system or efficiency of the new building equipment. In addition to those incentives, Waupun Utilities offers supplemental incentives for certain efficiency measures and offers an electric vehicle charging incentive. The city should collaborate directly with Waupun Utilities on understanding the potential applicability of those incentives. Other Grants and Opportunities Other grants and opportunities through the state government or federal government also could potentially provide funding for installation of these projects. The state will receive an Energy Efficiency Community Block Grant (EECBG) of $2.3 million and 60% ($1.38 million) must be passed along to local governments not eligible for formula funding. Waupun should look for opportunities for funding from the state in early 2024. Additionally, future rounds of the Energy Innovation Grant Program grant program would be a good opportunity to apply for an innovative new heating system or solar installation. Page 24 Appendix 1: Individual Building Results Waupun Library Size: 25,647 ft2 Age: Original construction in 1968 with additions in 1997 and 2008. Existing heating and cooling system: Rooftop units and several furnaces with split system air conditioners. Electricity Use: 145,000 kWh Natural Gas Use: 8,020 therms EUI: 53.8 kBtu/square foot. Significantly better than median from comparable buildings in region. Waupun Library has made several improvements in the last several years, including a full LED replacement and partial roof replacement in 2017. The building also uses regular thermostat setbacks and setups and implements regular maintenance. Table 14 summarizes the recommended measures between high priority and end-of-life. The end-of-life measures’ payback period is not included as it depends on incremental cost compared to the other option being considered at replacement time. Maintenance refresh does not have a payback as the first cost is zero. Table 14. Waupun Public Library measure prioritization and estimated savings High Priority: Maintenance Refresh Next Step : Implement any of the steps below that can be completed by facilities staff. We recommend a basic maintenance refresh be done every couple of years. It can be primarily carried out by facilities staff or local contractors and have an immediate impact on energy consumption. Items for the library include: • Check/replace door seals; make sure windows operate and seal properly. • Air seal around windows • Air seal exterior walls and ceilings around accessible plumbing, electrical, and HVAC penetrations. • Air seal and insulate roof access hatch if needed. High Priority: Low Flow Aerators Next Step: Review faucets and install aerators on faucets without existing aerators Low-flow faucets are an easy do-it-yourself upgrade that can result in a quick payback. Standard aerators deliver 2.2 gallons per minute (gpm) while low-flow versions should deliver 1.0 gpm or less. Improvement measure First Cost Simple Payback $ $ (%) Electric Savings (%) Gas Savings (%) Years Tons CO2e % Maintenance refresh High $0 $200 1% 1% 1% - 1.2 1% Low flow fixture and aerators High $50 $70 0% 0% 1% Less than 1 0.4 0% Insulation upgrade - Roof EOL $27,700 $2,100 10% 5% 25% - 14.5 12% Insulation upgrade - Walls EOL >$100,000 $1,600 8% 3% 20% - 10.9 9% Air sealing EOL $19,800 $300 1% 0% 4% - 1.7 1% Upgrade windows EOL >$100,000 $500 2% 2% 3% - 3.1 2% New packaged RTU EOL $96,200 $800 4% 5% 0% - 4.4 4% ENERGY STAR residential refrigerator EOL $1,600 $30 0% 0% 0% - 0.1 0% Total Priority Measures High 50$ 270$ 1% 1% 2% Less than 1 1.6 1% Priority Annual Utilty Cost Savings Annual Carbon Savings Annual Energy Savings Page 25 EOL: Roof and Wall Insulation with Air Sealing Next Step : Have an engineer or contractor inspect current insulation and determine how much additional insulation should be added where feasible. We recommend roof insulation be improved to R-35 or better the next time the waterproof roof membrane is replaced. Original portions of the library constructed in 1968 have little to no insulation. Walls appear to be constructed of bare concrete block or brick with no insulation. This lack of insulation results in high gas consumption. Improving the wall insulation and wall air sealing, however, would be a major challenge since the interior surface of exterior walls are often covered with drywall or other finishes, and the exterior surface of walls are architectural brick. Wall insulation with air sealing would likely need to be part of a larger remodel of the facility’s exterior. EOL: Upgrade Windows Next Step : Obtain a quote from a qualified contractor for window replacements. We recommend replacing windows as they reach end-of-life to address the warm conditions in the second floor reading area. Window films have been retrofitted onto some of the windows in the main entrance, which have resulted in some marginal improvements in reducing solar heat gain but has also caused some issues such as glass breakage. When these windows (and nearby skylights) reach their effective useful life, specify products certified by ENERGY STAR® or by the National Fenestration Rating Council (NFRC) and look for products with a U-Value of less than 0.30 and a Solar Heat Gain Coefficient (SHGC) of less than 0.25. EOL: High Efficiency Packaged Rooftop HVAC Equipment or Heat Pumps Next Step : Have a contractor review current systems and determine replacement plan for all heating and cooling equipment. At end of useful life, it is recommended that the City procure new rooftop and split-system equipment with efficiency levels well above code minimum or consider adoption of a heat pump system. Both RTUs and split- systems can be replaced with heat pump technology that uses electricity efficiently to both heat and cool rather than cooling-only. Determining a replacement plan before failure will allow for better budgeting and easier implementation of emerging technologies such as packaged cold-climate heat pump rooftop units with gas backup. EOL: ENERGYSTAR Appliances Next Step : Review an ENERGY STAR list before purchase of new refrigerator or other new appliances.11 When the refrigerator in the break room reaches end of life, we recommend replacement with an ENERGY STAR model. ENERGY STAR energy efficient products should also be implemented for all key measures. 11 A list of qualified ENERGYSTAR products is here: https://www.energystar.gov/products/products_list Page 26 Waupun Safety Building Size: 21,381 ft2 Age: 1986 with a 2009 addition Existing heating and cooling system: Several furnaces with split system air conditioners. Electricity Use: ~122,000 kWh Natural Gas Use: ~7,500 therms EUI: 59.2 kBtu/square foot. Significantly better than median from comparable buildings in region. The Safety Building implemented a full LED replacement in 2018 and has established habits around turning lights off when rooms are not in use. The occupants expressed concerns about comfort in the winter and thermostat functionality. The material of the building makes insulation upgrades expensive and difficult to install. The recommended measures below work to address the concerns while keeping cost in mind. Table 15 summarizes the recommended measures for the Safety Building. The end-of-life measures payback period is not included as it depends on incremental cost compared to the other option being considered at replacement time. The measures with no upfront cost also do not include a simple payback. Table 15. Waupun Safety Building recommended measures, first cost, and savings High Priority: Retrocommissioning Measures Next Step : Focus on Energy provides incentives and a list of qualified contractors for retrocommissioning or building tune-ups. Contact them to understand potential programs and enroll.12 We recommend the Safety Building explore retrocommissioning to address the concerns around comfort and thermostat functionality in the building. Retrocommissioning is a process of servicing and repairing existing heating and air conditioning equipment to restore it to nearly its original level of performance. Although the retrcommissioning payback is somewhat longer, we recommend this measure to address current comfort issues in the building. Retrocommissioning for the safety building would include furnace and air conditioner tune-ups, air duct sealing and cleaning, ventilation system testing and balancing, replacing furnace filters, and testing thermostat setbacks. High Priority: Maintenance Refresh Next Step : Implement any energy efficiency measures that can be completed by facilities staff. We recommend a basic maintenance refresh be done every couple of years. For the Safety Building, the maintenance refresh should focus on air sealing. Weatherstripping and sealing any openings will improve 12 Information on Focus’ retrocommissioning incentives are here: https://focusonenergy.com/business/building- optimization Improvement measure First Cost Simple Payback $ $ (%) Years Electric Savings (%) Gas Savings (%) Tons CO2e % Multiple Retrocommissioning Measures High $10,700 $900 5% 12 5% 5% 6.4 5% Maintenance Refresh High $0 $1,200 6% - 7% 7% 8.5 7% Remove Electric Space Heaters High $0 $400 2% - 7% -6% 2.1 2% Low Flow Faucet Aerators High $100 $100 0% Less than 1 0% 0% 0.2 0% Energy Star Air Conditioners EOL $44,800 $400 2% - 3% 0% 2.1 2% Replace Windows EOL $4,800 $300 1% - 2% 0% 1.5 1% Total Priority Measures High 10,800$ $2,600 14% 4 18% 6% 17.2 13% Priority Annual Utilty Cost Savings Annual Energy Savings Annual Carbon Savings Page 27 comfort. We believe this work can be accomplished by facilities staff or local contractors and have an immediate impact on energy consumption. High Priority: Remove Electric Space Heaters Next Step : Implement other measures to improve comfort and then limit electric space heaters. We recommend limiting the number of electric space heaters used in offices. The building has a significant increase in electric bills during the winter months which can be attributed to running these space heaters. The measures described above should improve the heating system’s performance and eliminate excess heating loads, allowing these space heaters to be either removed or not operated. High Priority: Low Flow Aerators Next Step: Audit all faucets and install aerators on faucets without existing aerators . Low-flow faucets are an easy do-it-yourself upgrade that can result in a quick payback. Standard aerators deliver 2.2 gallons per minute (gpm) while low-flow versions should deliver 1.0 gpm or less. EOL: Replace Windows Next Step : Obtain a quote from a qualified contractor for window replacements. We recommend replacing windows as they reach end-of-life, especially in the original wing of the building. The building’s exterior windows are aging and an opportunity exists to replace them with better insulating windows. New windows also produce less solar heat gain (excess heating caused by the non-visible portion of solar radiation shining through the windows). When replacing windows, specify products certified by ENERGY STAR® or by the National Fenestration Rating Council (NFRC) and look for products with a U-Value of less than 0.30 and a Solar Heat Gain Coefficient (SHGC) of less than 0.25. EOL: ENERGY STAR Air Conditioners Next Step : Discuss air conditioning replacement with Focus on Energy. Incentives are available for qualifying products.13 We recommend replacing the air conditioners that are nearing the end of their service lives with new ENERGY STAR® certified air conditioners. This will help lower electric bills in the summer. Prioritize replacing the oldest air conditioners first. The City could also consider heat pump options to replace existing furnaces and AC units at the same time. Determining a replacement plan before failure will allow for better budgeting and easier implementation of heat pumps. 13 Focus on Energy incentive list is located here: https://s3.us-east-1.amazonaws.com/focusonenergy/staging/inline-files/2023/BIZ- Summary_of_Services_and_Incentives.pdf Page 28 Waupun City Hall Heating Size: 25,647 ft2 Age: Original construction in 1928 Existing heating and cooling system: Steam radiators and air conditioning system in offices and conference rooms Electricity Use: 60,000 kWh Natural Gas Use: ~14,000 therms (higher natural gas use than expected for age and condition of building) EUI: 85.4 kBtu/square foot. Better than median EUI of comparable buildings in climate zone The project team looked specifically at the City Hall steam boiler system. The boiler is near end-of-life and needs replacement. The steam boiler piping is also nearing the end of its life, as staff had identified four pipes that are corroding and will likely need replacement. Because the City Hall is a historic landmark, city staff are concerned about ripping out and installing new steam or hot water piping throughout the building. The age of the system and the uninsulated condensate return pipes are likely contributing to higher natural gas use. The team modeled alternative solutions for the City Hall heating system. Table 16 summarizes the various options and longer descriptions are below. The first costs are estimated for the heating systems – however the historic characteristics of these existing system may increase these costs significantly. The negative electricity savings from VRF and geothermal are a result of that each system will add air conditioning to the theater and thus increase overall air conditioning energy use in the building. Table 16. City Hall heating system replacements Option A: Steam Trap Repair and Steam Pipe Insulation The repair of the current steam system is the lowest cost option but will lead to minimal savings and not fully address the concerns with the heating system. It would involve replacing the existing system with a new steam boiler, repairing pipes, repairing steam traps and insulating steam pipes. Option B: Hot Water Boiler System Another option is to replace the steam system with an entirely new hot water condensing boiler system. The new boiler would be more efficient and save energy. However, it would require significant work to replace the existing steam radiators and install new piping throughout the building. Option C: Variable Refrigerant Flow (VRF) System A third option is to add a VRF system or heat pumps that both heat and cool the space with refrigerant run to each space. Replacing the steam system with a VRF still requires work throughout the building, but the smaller refrigerant lines require less space than hot water and steam. Radiators could be replaced with heat pumps and heat pump outdoor units could go on the roof with a cold-climate design. As the air conditioning was ment measure First Cost Simple Payback $ $ (%) Years Electric Savings (%) Gas Savings (%) Tons CO2e % Stream trap study / repair High $3,100 $1,200 5% 3 0% 10% 8.5 6% Steam Pipe Insulation High $3,300 $2,800 13% 1 0% 24% 21.0 16% Hot Water Boiler EOL >$550,000 $2,100 10% - 0% 18% 15.8 12% VRF EOL >$650,000 -$700 -3% - -116% 88% 25.2 19% Geothermal System EOL >$750,000 $1,100 5% - -105% 94% 35.5 27% Total Priority Measures High 6,400$ 4,000$ 18% 2$ 0% 34% 29.5 22% Priority Annual Utilty Cost Savings Annual Energy Savings Annual Carbon Savings Page 29 recently replaced in many spaces, it is a less economical solution as it would be replacing relatively new AC. It could add some air conditioning to the theater. VRF systems are well suited to historic renovations as it is easier and less expensive to run refrigerant piping than the larger piping of stream or hot water. Option D: Geothermal Heat Pump System Geothermal heat would require finding a location for a large borefield outside of the building, but if there is a location, it has the most energy savings. It also has the potential for the lowest cost due to the federal Inflation Reduction Act, which offers direct pay option as replacement for tax credits up to 30% of the cost of a geothermal system. Next Steps It is recommended that the City contact a heating contractor to discuss the options for the City Hall heating system and discuss internally the benefits and costs of the various options. Table 17 summarizes the considerations for each heating system. Table 17. Summary of heating replacement options First Cost Maintenance Energy Cost Savings Other considerations Steam Remediation $ Need to replace corroding pipes Hot Water Boiler $$$ VRF $$$ A/C for Theater, exterior equipment, easier retrofit Geothermal Heat pump $$$$* A/C for Theater, Requires large geothermal borefield * Inflation Reduction Act tax credits would reduce the first cost by 30%. Requires Review Better Best Page 30 Appendix 2: Solar Methodology and Details Methodology The project team identified solar opportunities by reviewing energy use profiles and roof space available by building. The project team removed the Aquatic Center, Community Center/Hockey Rink, and Heritage Museum. The Community Center had little to no energy consumption in the summer and high consumption in the winter – which is opposite of the times of year when solar panels produce the most electricity. The Aquatic Center had little space available, and the Heritage Museum had little space available and low consumption. For the other buildings, the team started by identifying the space available by reviewing the buildings with Google satellite mapping and through discussions on roof age and condition. The satellite imaging provides the direction the roof faces and degree tilt. Buildings with south-facing roofs generally offer the most cost-effective opportunities for installing solar arrays, followed by buildings with east or west facing roofs. The degree tilt represents how angled the panels are on the roof. On average, matching the degrees of tilt for the panels to the degrees latitude of the solar array will produce the most electricity over the course of a year. If a building’s roof is not tilted at this angle, panel mounting can apply a tilt that balances shading with optimal angle. The roof space available was combined with hourly energy data and utility bill rates and entered into a technoeconomic tool, ReOpt, to find the most cost-effective solution. ReOpt takes inputs of a building’s energy loads, utility rate, and based on inputs and constraints from the user optimizes the sizing of solar PV. The analysis assumes that the net metering limit is 26 kW dC. This is the current limit set by Waupun Utilities 14 and any solar installation below this size receives the full utility retail rate (the same as what is paid) for any overproduction of solar that is sent back to the grid. Any solar size above 26 kW dC receives the buyback rate (or wholesale rate) instead. The buyback rate is lower than the retail rate and changes yearly. Both rates are only applicable when the amount of solar produced at a certain time is higher than the building’s consumption. The remainder of the time the solar production is saving money as no energy must be purchased from the grid. Other assumptions include: - The lifetime of the system is 25 years. This is a conservative with estimates going up to 50 years. - The estimated upfront cost is $2,500/kW for systems below 100 kW. Only bids can give real costs. - Roof loading and electrical panel space needs to be verified by a trained design professional. - Operations and maintenance costs are low. The largest cost is inverter replacement at 15 years We present inputs and a set of scenarios that minimize payback period or maximize CO2 emissions for each building. Table 18 below includes a definition for each output shared for the buildings. Table 18. Solar analysis output definitions 14 There are currently cases being heard by the PSC to change this net metering limit or remove it. However, those cases have not been decided so at this point in time this limit still holds. If it changes in the future, payback periods may change slightly. 15 Focus on Energy solar incentive information: https://assets.focusonenergy.com/production/inline-files/2023/RR-Solar-PV-APL.pdf Output Definition System Size Total solar photovoltaics size in kW dc. Payback (years) Calculated as total upfront cost (after incentives) divided by first year cost savings. Shown with constant electric rates and a 1% increase each year. Percent Renewable Electricity Total electricity produced divided by total energy consumption Lifetime Carbon Savings (metric tons) Electricity consumption converted to solar. Avoided energy from grid multiplied by carbon emissions factor on hourly level. Lifetime Energy Savings Total energy bill savings over the lifetime of the solar panels (25-years). Shown with constant electric rates and a 1% increase each year. Total Upfront Cost Total initial upfront cost ($2500/kW multiplied by system size) Focus on Energy Incentives15 Focus on Energy Business rebates IRA Tax Credit 30% direct pay through Inflation Reduction Act. Total Cost Total initial upfront cost minus rebates and tax incentives Page 31 City Hall Available roof space: 2,600 square feet available. Excludes flat sections of the roof as identified as likely unable to hold solar panels. Utility rates: Flat rate of $0.1095/kWh; no demand charge. Wholesale (buyback) energy rate: $0.032 in off-peak; $0.045/kWh in on-peak Orientation: West and east-facing at 30-degree tilt (angle of roof) Annual energy use: ~60,000 kWh Table 19 presents one option for solar arrays on City Hall. It maximizes roof space and minimizes payback. Table 19. City Hall recommended solar array Metric System Information System Size 26 kw dC Payback (years) 12.6 - 14.4 Percent Renewable Electricity 42% Lifetime Carbon Savings (metric tons) 488 Lifetime Energy Savings $72,649 - $82,900 Total Upfront Cost $65,000 Focus on Energy Incentives -$3,750 IRA Tax Credit -$19,500 Total Cost $41,750 Page 32 Library Table 20 provides system information for two separate solar installations. The first array is the cost-optimized solution with the lowest payback period. The second array maximizes space available on the roof. As the second option only slightly increases the payback period, we recommend pursuing that option. Table 20. Library recommended solar array Available roof space: 4,500 square feet available. Utility rates: Time-of-use rate. $0.0615/kWh in off- peak, $0.085/kWh in on-peak; $8.5/kW demand charge in peak Wholesale (buyback) energy rate: $0.032 in off- peak; $0.045/kWh in on-peak Orientation: South facing at 20-degree tilt Annual energy use: ~145,000 kWh Metric Cost-Optimized Maximize Renewables System Size 37 kW dC 45 kW dC Payback (years) 12.6 - 14.3 13 - 14.9 Percent Renewable Electricity 31% 38% Lifetime Carbon Savings (metric tons) 836 1017 Lifetime Energy Savings $103,992 - $118,666 $122,054 - $139,264 Total Upfront Cost $92,500 $112,500 Focus on Energy Incentives -$5,125 -$6,125 IRA Tax Credit -$27,750 -$33,750 Total Cost $59,625 $72,625 Page 33 Public Works Garage Available roof space: 11,800 square feet available. Only need 2,600 – 4,500 square feet. Utility rates: Flat rate: $0.1095/kWh; no demand charge. Wholesale (buyback) energy rate: $0.032 in off-peak; $0.045/kWh in on-peak Orientation: South facing with 20-degree tilt Annual energy use: ~71,000 kWh Table 21 provides system information for two solar installations. The first array is the cost-optimized solution with the lowest payback period. The second option increases the percent renewable electricity to 75% but increases the payback. We recommend the second option as it is the only city facility that can serve as an example of getting close to 100% renewable electricity. Table 21. Public Works Garage recommended solar array Metric Cost-Optimized Maximize Percent Renewable System Size 26 43 Payback (years) 10.4 - 11.8 14.5 - 16.6 Percent Renewable Electricity 45% 75% Lifetime Carbon Savings (metric tons) 587 981 Lifetime Energy Savings $88,098 - $100,527 $105,544 - $120,437 Total Upfront Cost $65,000 $108,539 Focus on Energy Incentives -$3,750 -$5,927 IRA Tax Credit -$19,500 -$32,562 Total Cost $41,750 $70,050 Page 34 Safety Building Available roof space: 8,500 square feet available. Utility rates: Time-of-use rate. $0.0615/kWh in off-peak, $0.085/kWh in on-peak; $8.5/kW demand charge in peak Wholesale (buyback) energy rate: $0.032 in off-peak; $0.045/kWh in on-peak Orientation: Mix of east, west, and south facing with 30- degree tilt Annual energy use: ~122,000 kWh Table 22 illustrates the cost-optimized solution and the solution that maximize renewable energy. We recommend the cost-optimized solution in this situation as the larger system significantly increases payback. Table 22. Safety Building recommended solar array Metric Cost-Optimized Maximize Renewables System Size 26 85 Payback (years) 15.8 - 18 21.8 - 24.8 Percent Renewable Electricity 22% 71% Lifetime Carbon Savings (metric tons) 481 1574 Lifetime Energy Savings $57,870 - $66,041 $138,573 - $158,109 Total Upfront Cost $-65,000 $212,500 Focus on Energy Incentives -$3,750 -$11,125 IRA Tax Credit -$19,500 -$63,750 Total Cost $41,750 $137,625 Page 35 Appendix 3: Fleet Analysis Methodology The analysis measured the current annual energy, cost, and emissions impacts of the City of Waupun’s municipal fleet. It also applied data on current vehicles to performance metrics of new gasoline, diesel, and electricity-fueled vehicles to recommend a strategy through which the City can cost-effectively reduce the energy used and emissions generated by its vehicles. The methodology used to calculate data on current vehicles and prepare recommendations for fleet vehicle replacements is described below. 1. Calculate key performance indicators (KPIs) for municipal fleet vehicles. • Collected data showing the number of gallons and cost of fuel purchased for each vehicle, as well as the fuel type (gasoline, diesel, or other) during a 12-month period • Collected data showing the number of miles driven by each vehicle during the same 12-month period. • Applied data for fuel use, fuel type, and miles driven to calculate the pounds of CO 2e emitted by each vehicle • All City-owned vehicles were assigned to one of seven categories: Large Car, Full-size Pickup Truck, Heavy-duty truck, Small SUV, Mid-size SUV, Large Truck, Street Sweeper, and “Other.” [Other includes lawnmowers, and fuel trucks.] • C alculated the annual fuel use, fuel cost, miles driven, and CO2e emissions for all of the City’s vehicles, then segmented each metric for each vehicle category. 2. Surveyed the market to identify all electric vehicles available in the existing vehicle categories in the City’s fleet. • Limited findings to eliminate vehicles that are not yet in production or had limited market share, making them difficult for the City to obtain. • Within each vehicle category, identified a cost-effective EV option that met minimum driving range requirements and had a strong fuel economy (kWh/100 miles) rating to use for opportunity analysis. • Used the commercial clean vehicle tax credit qualified manufacturer list to reduce the assumed cost of each EV by the value of any Federal tax credit for which it may be eligible. Through the Inflation Reduction Act, municipalities have access to tax credits through a direct pay provision. 3. Surveyed the market to identify a leading gasoline or diesel-powered vehicle in the existing vehicle categories in the City fleet that the City would be likely to consider for purchase during its normal vehicle retirement and replacement process. • Identified cost and fuel economy metrics for each selected vehicle. 4. Used average gasoline, diesel, and electricity costs to calculate the cost of fuel used to drive one mile by the selected EV and by the selected gasoline or diesel vehicle in each vehicle category. • Gasoline = $3.58/gallon – Based on average per gallon gasoline cost reported for the period by five Wisconsin municipalities currently engaged in energy planning projects. • Diesel = $4.28/gallon - Based on average per gallon diesel cost reported for the period by five Wisconsin municipalities currently engaged in energy planning projects. • Electricity = $0.11/kWh – Based on U.S. Energy Information Administration (EIA) average commercial electricity cost for the State of Wisconsin. Page 36 5. Applied research by Consumer Reports16 to estimate the average per mile maintenance costs for EVs and gasoline or diesel-powered vehicles. 6. Calculated the potential cost savings per mile that the City could obtain by purchasing an EV in place of a gasoline or diesel vehicle. If the net purchase cost of the EV exceeded the cost of the gasoline or diesel vehicle, calculated the number of miles after which the per mile cost savings from driving the EV would surpass the incrementally higher purchase cost of the EV. 16 Harto, C. Electric Vehicle Ownership Costs: Chapter 2 – Maintenance. Consumer Reports. September, 2020. (https://advocacy.consumerreports.org/wp-content/uploads/2020/09/Maintenance-Cost-White-Paper-9.24.20-1.pdf) AGENDA SUMMARY SHEET MEETING DATE: 11/10/26 TITLE: Nummerdor Dr. and N. Madison St. Pond location AGENDA SECTION: Discussion PRESENTER: Jeff Daane, Public Works Director DEPARTMENT GOAL(S) SUPPORTED (if applicable) FISCAL IMPACT Future Readiness ISSUE SUMMARY: In 2017, MSA helped the City develop a stormwater quality master plan that considered a pond at Richard Holmes Park , at the Southeast corner of N. Madison St. and Nummerdor Dr. The site was not ideal because of its proximity to the school and walking path. The City then contacted Forest Mound Cemetery to explore purchasing property for an alternative location. MSA has initial results of the location change below. Yes, this looks to be a viable option – although, not surprisingly, there are some positive/negative factors, as well as a number of details that’ll need to be fully worked out before we can give you 100% confident answer. Please refer to the map below and the attached spreadsheet: 1.) The red outline is the watershed boundary that was estimated to serve the originally planned pond. This was originally estimated as 93.2 acres. a. The black triangle indicates the original location of the pond. b. The black arrow points toward the current location of the pond. 2.) Our design has not been ‘CADDed up’ and so is pretty simple, but nevertheless shows a pond that is not quite 50% the size of the original pond. This changes the ratio of watershed area to pond area which results in the pond efficiency going down: a. 2017 estimated TSS reduction = 69% b. 2026 estimated TSS reduction = 59%. I think with a full design we can do better, but it’ll be measured as a few percentage points. Even though the overall cost-effectiveness of this pond is pretty decent, I generally lose enthusiasm for recommending BMPs that get less than 60% TSS reduction (at least until we start reaching the bottom of the list of potential improvements). 3.) Subwatershed #3 is the area that will not be able to be routed to the location of the pond if moved to the cemetery – this will reduce the treated area to 77.6 acres. 4.) The area shown with the magenta highlighted edge describes lands outside the City limits. Technically, the City is not supposed to take credit for treating these areas since they are not within the MS4 (you also don’t get penalized for the loads from these areas). Probably, after some WDNR negotiations, the City *could* take treatment for anything in excess of the TMDL minimums – except: a. TMDL minimum targets are 41% TSS reduction and 48% TP reduction. b. The estimated treatment provided by the new pond is 59% TSS reduction, but only 29% TP reduction. It is the low TP reduction value that hurts the argument. During full design we can probably improve on this, but even the much larger original pond design only got 46% TP reduction. 5.) Some other considerations: a. Subwatershed #2 may-or-may not drain to the location of the proposed pond. Some grading work (swale) might be necessary to get it to flow to the pond. For this analysis, we’ve assumed it *will* drain to the pond. b. The intersection of Hoard Road and E. Spring Street might need some work to be sure it drains to the pond. It looks like the original intention was that this area drain east but the existing culverts appear to be just about completely buried. Ditching and new cross-culverts in this location are not included in the cost estimate, but I would assume they would be pretty minimal costs by comparison. c. There will be some additional storm sewer work to route spring street into the pond and then back to Spring Street. This will add roughly 360 feet of pipe length which will require some fall – around 8”. This might require relaying pipe in Spring Street further upstream or down – adding costs which are also not included in the estimate. 6.) Cost estimates reflect estimated costs from 2017 (the original report). They are undoubtedly (much) higher now, but I kept the for ease and for comparison. 7.) See attached spreadsheet, the estimated life-cycle cost estimate for TP reduction of the relocated pond is still quite low (~$300/lb/yr) and makes the pond an attractive option. Back in 2017, we used a cost of $1,000/lb/yr as the cost-effective threshold. These options are well under that value (even adding $100K of additional storm sewer costs only increases the life-cycle cost to about $500/lb/yr). STAFF RECOMMENDATION: This does look like a good option. Work with cemetery to see if they would be willing to look at a bit more property. Then have MSA run some final numbers ATTACHMENTS: Proposed pond life cycle cost estimate Item Quantity Unit Unit Price Total GENERAL Mobilization, Bonds, Insurance 1 LS 9,500.00$ 9,500.00$ Traffic Control 1 LS 500.00$ 500.00$ Erosion Control 1 LS 3,800.00$ 3,800.00$ GRADING/REMOVALS Clearing & Grubbing 1 LS 2,000.00$ 2,000.00$ Common Excavation (Hauled-Off) 7970 CY 15.00$ 119,550.00$ STORM SEWER Outlet Control Structure 1 EA 20,000.00$ 20,000.00$ Modify Existing Storm Sewer to Pond 1 EA 20,000.00$ 20,000.00$ RESTORATION Topsoil, Seed, Fertilize 3450 SY 5.00$ 17,250.00$ Erosion Control Mat, Class 1, Urban, Type B 3450 SY 3.00$ 10,350.00$ Construction Total 202,950.00$ Engineering & CRS - 18% 36,530.00$ Contingency - 25% 50,740.00$ Land Acquisition 1 LS 143,000.00$ 143,000.00$ Total 433,220.00$ Construction Cost Used for Life-Cycle Cost Estimates 253,690.00$ (Includes no acquisition, civil/geotechnical engineering, or construction services) Proposed Pond 9 - SE Quad Nummerdor & Madison Street Landowner: Joint School District #1 Project Cost Estimate Prepared by MSA Professional Services, Inc. 27-Oct-17 Item Quantity Unit Unit Price Total GENERAL Mobilization, Bonds, Insurance 1 LS 9,500.00$ 9,500.00$ Traffic Control 1 LS 500.00$ 500.00$ Erosion Control 1 LS 3,800.00$ 3,800.00$ GRADING/REMOVALS Clearing & Grubbing 1 LS 2,000.00$ 2,000.00$ Common Excavation (Hauled-Off) 3000 CY 15.00$ 45,000.00$ STORM SEWER Outlet Control Structure 1 EA 20,000.00$ 20,000.00$ Modify Existing Storm Sewer to Pond 1 EA 20,000.00$ 20,000.00$ RESTORATION Topsoil, Seed, Fertilize 3450 SY 5.00$ 17,250.00$ Erosion Control Mat, Class 1, Urban, Type B 3450 SY 3.00$ 10,350.00$ Construction Total 128,400.00$ Engineering & CRS - 18% 36,000.00$ Contingency - 25% 32,100.00$ Land Acquisition 1 LS 60,000.00$ 60,000.00$ Total 256,500.00$ Construction Cost Used for Life-Cycle Cost Estimates 160,500.00$ (Includes no acquisition, civil/geotechnical engineering, or construction services) Proposed Pond 9 Project Cost Estimate Prepared by MSA Professional Services, Inc. 29-Oct-26 TMDL Reach Proposed Pond Planning Year Pond Name/Location Tributary Area (ac) TSS Removed (lbs/5yr) TSS Removed (lbs/yr) TP Removed (lbs/5yr) TP Removed (lbs/yr) Total Estimated Initial Project Cost Estimated Construction Cost Annual Maintenance ($/yr) Maintenance Present Worth Future Dredging Cost Dredging Cost Present Worth Total Present Worth Lifetime TP Removed (lbs) TP Removal ($/lb) Recommended 2 9 2017 SE Quadrant Nummerdor Dr. / Madison St. 93.2 31060 6212 91.0 18.2 $433,220 $253,690 $634 $16,318 $32,190 $7,343 $277,351 910.0 $305 Yes 2 9 2026 Cemetary 77.6 19685 3937 57.7 11.2 $256,500 $160,500 $401 $10,324 $29,557 $6,742 $177,566 560.0 $317 Yes Interest Rate 0.03 Sediment Density 80 lbs/cf Life Span for Dredging 50 Dredging Cost $50 /cy Annual Maintenance/Construction 0.25% Estimated Life-Cycle Cost Estimates for Alternative Stormwater Quality Ponds AGENDA SUMMARY SHEET MEETING DATE: 11/10/26 TITLE: Edgewood Dr. Flood Study update AGENDA SECTION: Discussion PRESENTER: Jeff Daane, Public Works Director DEPARTMENT GOAL(S) SUPPORTED (if applicable) FISCAL IMPACT Future Readiness ISSUE SUMMARY: After both this board and council had a chance to look at previous flood study it was recommended we start conversations with the property owner. We did have initial talks with them a few months back, and from that conversation they asked if we could shape the pond a bit differently to help farming operations. We sent comments to MSA, here are the recommended changes and what that looks like. 1.) We’ve included the original pond boundary from the modeling study. As I had previously warned, making the pond a triangle loses some efficiency, so the overall footprint got larger. 2.) The concept design shows the pond as a wet pond. For flood control purposes only, there would be no reason to make the pond wet. Someday, with development to the north, the pond could be converted to a wet pond to provide water quality treatment for the development (perhaps at the developer’s expense). 3.) The concept includes a small swale off to the east. This will be desirable to collect and route all the runoff from the field to the pond – but it may not need to be directly owned by the City. Also, since the plan would be to spread the material excavated from the pond onto the farm field (to reduce haul costs) this swale could potentially be a combination berm/swale. 4.) We’re showing an emergency overflow from the pond, just east of the outlet pipe. This is not intended to be used except for events greater than the 100-yr event; however, history has shown that we should expect a larger than 100-yr event. The location is probably not ideal, being right in the middle of the undeveloped lot to the south, but that is a detail that could be worked out in the future. In any event, the new acquisition area is about 70% larger than the original concept for a total estimated area of about 3.5 acres, not counting the swale. This assumes we don’t replace the existing storm sewer. Making it larger would allow the pond to be made smaller, but there would be the obvious increased cost of the pipe work. STAFF RECOMMENDATION: Continue discussions with the property owners ATTACHMENTS: Original flood study Updated conceptual plan 1702 PANKRATZ STREET, MADISON, WI 53704 P (608) 242-7779  TF (800) 362-4505  F (608) 807-5148 WWW.MSA-PS.COM Page 1 of 9 Memo To: Jeff Daane, Department of Public Works City of Waupun From: Abby Schaefer, PE and Eric Thompson, PE Subject: Edgewood Drive Flood Study Date: July 1, 2025 Introduction This memorandum documents the findings of a study of drainage and flooding problems reported by residential property owners along Edgewood Drive on the north side of the City. Residents report that runoff from the agricultural fields to the north of the city flows south into the city and between the existing homes causing damage to yards and water accumulation in basements. The study is based on a 2-dimensional XP-SWMM computer model of the 65.2-acre watershed depicted in Figure 1. Modeling was used to evaluate existing conditions to determine the scope and magnitude of flood conditions as well as to evaluate alternatives to improve drainage and reduce flood conditions affecting existing homes. Existing Drainage System Figure 1 depicts the drainage system serving the watershed. Information describing existing drainage infrastructure was obtained from record drawings for the Fairway Estates and Woodland Hills development plans. These plans describe a primary drainage system consisting of a 24” RCP storm sewer system originating on the northwest corner of the undeveloped lot at 728 Edgewood Drive which flows south across Edgewood Drive. This pipe is believed to have been extended to its current location for the purpose of collecting drainage from undeveloped lands outside the City; however, it is observed that the only way runoff can enter the pipe is via a flat grate, which is hydraulically very restrictive. Additionally, existing grades surrounding the grate do not effectively route runoff toward the pipe. Both considerations contribute to the reported flooding. The 24” RCP storm sewer flows south to Edgewood Drive where it receives additional drainage from Edgewood Drive and surrounding lands before discharging to an open channel system on the south side of Edgewood Drive. Drainage from the west is delivered via a system of roadside ditches while runoff from the east is conveyed by storm MEMO July 1, 2025 Page 2 of 9 G:\00\00212\00212155\Reports\Recomendation Memo\Waupun_EdgewoodDr_Memo_Final.docx sewers. The channel south of Edgewood Drive discharges into a stormwater pond behind the homes at 600 and 604 Beske Street which in turn discharges to the South Branch of the Rock River. Design flow rates and flood elevations were calculated using the XP-SWMM 2D computer model version 2024.1. XP SWMM is an integrated fully dynamic hydrologic and hydraulic model capable of generating runoff hydrographs for specified rainfall conditions and routing the hydrographs through a complex drainage system consisting of closed conduits (pipes/culvert) and topographical surface features. Hydrologic Calculations The hydrologic modeling portion of the XP-SWMM model was set up to use the TR -55, ‘Urban Hydrology for Small Watersheds’ (USDA, 1986) methodology of calculating runoff volumes and routing operations. In addition to a rainfall data record to be used to simulate rainfall conditions, the TR -55 method requires three primary input parameters to determine peak discharge rates and runoff volumes. These parameters describe the runoff characteristics of a watershed and include drainage area, runoff curve number, and time of concentration. The model uses these input parameters to translate a rainfall hyetograph (distribution of rainfall depth over time) to a runoff hydrograph that the hydraulic portion of the model then routes through the system to determine peak runoff rates and flood elevations. Rainfall Events. Because this study was intended to evaluate the function of the existing system of storm sewers and inlets under normal ‘design’ conditions, as well as to determine how the overall drainage system performed under ‘flood’ conditions, stormwater calculations were performed for the 1-, 5-, 10-, 25-, and 100-yr 24-hr rainfall events. The MSE 24-hour rainfall intensity distribution with NOAA Atlas 14 rainfall depths for Fond du Lac County were used for event-based modeling. Table 1 lists the design depths used in the analysis. Table 1. NOAA Atlas 14 Design Storm Rainfall Depths Rainfall Duration 99.9% AEP (inches) 1-Year 20% AEP (inches) 5-Year 10% AEP (inches) 10-Year 4% AEP (inches) 25-Year 1% AEP (inches) 100- Year 24- hours 2.23 3.69 4.57 5.33 6.16 Drainage Areas. Drainage areas were manually delineated using 1-foot contours, storm sewer mapping, and aerial photographs obtained from Fond du Lac County LiDAR data. The primary watershed boundary was defined as those areas draining MEMO July 1, 2025 Page 3 of 9 G:\00\00212\00212155\Reports\Recomendation Memo\Waupun_EdgewoodDr_Memo_Final.docx towards the existing stormwater pond. Subwatersheds were delineated according to the presence of inlets serving streets and cross-culverts serving roadway crossings. In total, 65.2 acres of land is included in the study area limits (see Figure 1). This area was subdivided into 6 subwatersheds:  Area draining to the existing area drain to the north of Edgewood Drive (WH- M2).  Area draining to each 15” RCP culvert located on either side of Edgewood Drive (WH-E2 and WH-E4).  Area draining overland to the existing detention basin (FEP7).  Area draining to the curb and gutter inlets within the intersection of Beske Street and Beekman Street (WH-I1).  Area draining to the curb and gutter inlets within Edgewood Drive (WH-I11). Runoff Curve Numbers. For this study, each subwatershed was divided into two (2) separate catchments, one representing directly connected imperious areas and one representing the aggregation of disconnected impervious area and pervious areas. Impervious area within the study area was manually digitized using recent aerial photos, and impervious area connectivity was estimated according to its type (sidewalk, street, roof, etc.) and the surrounding land use category (residential, commercial, institutional, etc.) according to published average values (see Figure 2). In total there is approximately 3.8 acres of total impervious area with the study area (approximately 5.8% of total study area), of which approximately 2.6 are estimated to be directly connected. All impervious areas, regardless of connectivity, were assigned a runoff curve number of 98. Pervious area curve numbers were assigned values according to the TR-55 manual for pervious areas appropriate to their vegetated cover and underlying hydrologic soil classification. Review of aerial photographs indicated there were three general types of vegetative cover in the study area: turf, woods, and row crops (agricultural). The underlying soils within the study area are Hydrologic Soil Group (HSG) B Soils (see Figure 3). Soils with dual classifications such as B/D were treated as though they were in the drained condition. Times of Concentration. Each subwatershed in the study area was assigned a unique time of concentration based on estimated runoff conditions within each subwatershed. Unique time of concentration values were calculated for the portion of each subwatershed describing directly connected impervious areas vs. those representing aggregated unconnected impervious and pervious areas within each subwatershed. Times of concentration were calculated assuming only sheet flow and shallow concentrated flow regimes occurred. MEMO July 1, 2025 Page 4 of 9 G:\00\00212\00212155\Reports\Recomendation Memo\Waupun_EdgewoodDr_Memo_Final.docx Sheet flow was limited to a maximum of 100-feet and was assigned a Manning’s roughness coefficient based off the land use along the flow path:  Impervious surfaces (street surfaces), n = 0.016  Turf grass, n = 0.150  Woodland, n = 0.40 Shallow concentrated flowwas assumed to be occurring between the end of the sheet flow conditions and the outlet of the watershed, typically located at a storm sewer inlet location. Shallow concentrated flow velocity factors were assigned as follows:  Impervious areas (paved), velocity factor = 20.3 ft/sec.  Grassed waterways (turf grass), velocity factor = 15.0 ft/sec.  Cropland (cultivated straight rows), velocity factor = 9.0 ft/sec.  Woodland, velocity factor = 5.0 ft/sec. Due to the small size and corresponding short overland flow path within many of the subwatersheds, calculated time of concentration values were often less than 6 minutes. In such cases, a minimum value of 6 minutes was applied. Hydraulic Calculations Hydraulic modeling was completed using a 1D layer which included the system of culverts, storm sewers, and storm sewer inlets comprising the majority of the constructed drainage system and a 2D layer representing the ground surface which is utilized by the model when overland flows are determined to occur. 1D Hydraulic Drainage System. The 1D model network was developed primarily from data collected from record drawings for the Fairway Estates and Woodland Hills developments. The following information from the record drawings was used in the 1D model:  Pipes o Length o Diameter (all pipes in the study area are circular) o Upstream and downstream inverts o Material (all pipes are concrete)  Structures: (generally manholes or inlets) o Structure invert o Incoming/outgoing pipe invert o Rim elevation  Stormwater Pond o Primary spillway dimensions and elevation MEMO July 1, 2025 Page 5 of 9 G:\00\00212\00212155\Reports\Recomendation Memo\Waupun_EdgewoodDr_Memo_Final.docx In addition to data described above, there were three other significant elements describing system function which needed to be added to the model. These include inlet capacity, pipe roughness factors, and system minor losses. Storm Sewer Inlet Capacity. With one exception, storm sewer inlet capacity was not considered for this study. The one location where inlet capacity was incorporated was for the flat grate serving the storm sewer extending north from Edgewood Drive that was intended to receive flow from the farm field. The inlet capacity of this grate was limited according to the following equation; Q = 5.22 x Depth^0.5. This equation is a buit-in feature of XP-SWMM and approximates the weir flow behavior at shallow depths (generally less than 6”) and orifice behavior at greater depths. Manning Roughness. Only concrete pipes were identified in the record drawings. Correspondingly, a Manning’s ‘n’ value of 0.013 was assigned for all pipes. Minor Losses. Minor losses were assigned to the 1D model any time there was a transition from a closed conduit to an open channel condition or vice versa. Additionally, minor losses were assigned at structures within storm sewer systems. The following values were used:  Entry Loss Coefficients o Culverts:  End Section conforming to fill = 0.5  Projecting = 0.9 o Storm Sewer:  Straight Through = 0.05  45 degree bend = 0.25  90 degree bend = 0.5  Exit Loss Coefficient o Culverts:  Exit closed conduit to open channel = 0.5  Exit closed conduit to lake or pond = 1.0 o Storm Sewer:  Straight Through = 0.05  45 degree bend = 0.25  90 degree bend = 0.5 MEMO July 1, 2025 Page 6 of 9 G:\00\00212\00212155\Reports\Recomendation Memo\Waupun_EdgewoodDr_Memo_Final.docx Stormwater Pond. A stage-storage curve for the existing stormwater pond was developed from 1-ft contours derived from Fond du Lac County LiDAR data. The detention pond was modeled with an initial water depth of 2’ which appeared to be the typical water level in the pond based on recent and historic aerial imagery. The primary spillway of the existing detention pond was modeled with Type 2, fixed backwater outlet control. The tailwater condition was set at elevation 882.4’ reflecting the approximate 10-yr flood elevation in the South Branch of the Rock River. 2D Surface Hydraulic Drainage System The entire study area was included as a 2D surface within the XP-SWMM model. Buildings and the stormwater pond surface area were set to be inactive; this forced surface flows around buildings and prevented double counting of pond storage which was more precisely included in the 1D model. The 2D surface was used by the model to route runoff through the study area any time there was inadequate pipe capacity or where the predominant drainage system was an open channel system. This latter condition principally existed downstream from the storm sewer system, with open channels conveying discharge from the storm sewer system to the existing stormwater pond. 2D Surface Modeling Parameters. A 6-foot grid cell (with 1 second base time step) was assigned to the study area. Within each assigned grid cell values defining overland flow characteristics are aggregated to a single value applicable to the entire area defined by a single cell. While this results in a simplification of overland flow conditions, the selection of smaller cell sizes results in increasingly long model solutions times. 2D Land Use and Roughness Values. With regard to the 2D surface and overland flow characteristics, there were four principal roughness categories; Turf Grass, Woods, Agricultural, and Pavement. The values itemized below were applied as Manning roughness values for the listed ground conditions:  Pavement = 0.016  Turf = 0.03  Agricultural = 0.05  Woodlands = 0.05 MEMO July 1, 2025 Page 7 of 9 G:\00\00212\00212155\Reports\Recomendation Memo\Waupun_EdgewoodDr_Memo_Final.docx 1D-2D Interface Lines. A 1D-2D interface line was added to the model to connect the 1D and 2D layers of the model at the boundary of the inactive area representing the stormwater pond. 2D Boundary Conditions. Surface flow was predicted to leave the study area under the scenarios evaluated in this study in the area to the southwest of Edgewood Drive, including discharge from the existing detention pond. In these locations, a 2D boundary line was added to the model with an elevation set slightly below the ground elevation as defined by the 2D surface to allow surface flow to freely leave the model. This allowed a free outfall from the model system and prevented the appearance of flooding that would otherwise have been the result of an implied vertical wall that otherwise would exist around the perimeter of the 2D model area. Existing Flood Conditions Figures 4 through 8 depict estimated flood conditions within the study area under 1-, 5-, 10-, 25-, and 100-yr 24-hr rainfall conditions. Under even 1-yr conditions there is a substantial amount of runoff flowing overland from the farm field through the side yards of the residential lots between 720 and 732 Edgewood Drive. As rain events become more severe, stormwater accumulates behind these lots until, under 25-yr runoff conditions, an additional overflow occurs between 704 and 712 Edgewood Drive. There is a substantial accumulation of flow passing through the currently undeveloped lot at 728 Edgewood Drive. When this lot is developed, the building pad should be elevated well above the existing grade to protect the future home. It should be noted; however, that this will likely displace runoff onto other properties potentially increase flood impacts to those properties. Otherwise, it does not appear that overland flows coming from the farm field to the north of Edgewood Drive will directly impact existing homes. Frequent and extended overflows through side yards would be expected to saturate soil surrounding the homes which could cause groundwater intrusions into basements; however. One stormwater collects in the Edgewood Drive, flows appear to be contained within the right of way or designated drainage easements, even under 100-yr conditions. With specific regard to the findings of this study, it is important to recognize the limitations of the 2D component of this model. The main limitation is the newest available LiDAR data able to be used to develop the 2D model surface is older than some development shown on newer aerial photos (and even the most recent aerial photos don’t reflect all of current development). In these instances, the model surface likely does not reflect current topography and overland flow patterns may not be accurate. Since elevation data is aggregated within grid cells in the model some fine details critical to surface flow patterns may be lost. MEMO July 1, 2025 Page 8 of 9 G:\00\00212\00212155\Reports\Recomendation Memo\Waupun_EdgewoodDr_Memo_Final.docx Alternatives Analysis As presented in the introduction of this memorandum and documenting in the previous section on existing flood conditions, this study was completed to investigating resident reports that runoff from the agricultural fields to the north of the city flows south into the city and between the existing homes causing damage to yards and water accumulation in basements. Three potential alternative solutions to these problems were evaluated, including:  Alternative 1: Extension of the existing storm sewer further north into the farm field, removal of the inlet structure, and grading the local area to flow directly into the open pipe end.  Alternative 2: Includes Alternative 1 but adds construction of approximately 400 lineal feet of berm extending east to direct flow into the open pipe end.  Alternative 3: Includes Alternatives 1 and 2 and incorporates construction of an approximately 2-acre stormwater detention basin at the open pipe end. Alternative 1 offers a slight reduction in the extent of 100-yr flooding throughout the entire study area, but is not able to significantly improve flooding conditions for affected homes. The addition of the berm in Alternative 2 is able to eliminate flooding within Edgewood Drive for the 1% AEP event; however, flooding in the farm field is greatly increased. Alternative 3 both eliminates flooding of the residential properties north of Edgewood Drive, as well as slightly reducing flooding in the farm field. This alternative appears to address the driving concern of flooding of the residential properties along Edgewood Drive. While this alternative does not cause flood conditions to be made worse in the farm field to the north, it will require the City to negotiate with the owner of the farm field to acquire rights to construct the stormwater pond and berm on this property. Note; however, that the construction of this pond could easily be completed in a way to accommodate the stormwater management requirements of future land development in this area. MSA prepared a preliminary construction cost estimate for this alternative by creating a tabulated list of estimated quantities, which does not include any costs associated with the acquisition of the farmlands. Construction costs, not including property acquisition, are estimated to be approximately $250,000. Note, the cost estimate includes estimated engineering costs, but does not include a geotechnical assessment, it also assumes the bedrock will not be encountered, nor will there be a need to control groundwater. It is further assumed that there will be no need for a clay liner in the pond. This scope of this study did not include efforts associated with the optimization of this design. For instance, the pond may be able to be reduced in size, if a larger outlet pipe MEMO July 1, 2025 Page 9 of 9 G:\00\00212\00212155\Reports\Recomendation Memo\Waupun_EdgewoodDr_Memo_Final.docx were installed. This would require removal of approximately 200 feet of existing 24” pipe and replacement with larger pipe but could potentially be off-set by a reduction in pond construction costs (less excavation and land acquisition). Until such time as land acquisition costs are better known, it is not possible to confidently determine if costs will be significantly reduced through this process. Additionally, as the land to the north is anticipated to be developed at some time in the future and stormwater management will be required to serve that development, optimization of the pond through downstream improvements may not be warranted at this time. TOWN OF WAUPUN CITY OF WAUPUN Watershed Study Area City of Waupun Surface Roughness (Manning's n) Streets, Sidewalk, Driveway, Parking = 0.016 Buildings, Inactive Pond, Inactive Turf Grass = 0.03 Wooded = 0.05 Agricultural = 0.05 0 125 250 Feet Printed By: aschaefer, File: G:\00\00212\00212155\GIS\7_00212155_EdgewoodDrive_Waupun.aprx, 00212155_Figure2_ImperviousSurfaceRoughness, Surface Roughness - Impervious Areas Print Date: 6/27/2025 Data Sources: Aerial: WI DNR (2018) Watershed Boundaries: MSA Impervious Areas: MSA Land Uses: MSA City of Waupun Fond du Lac County, WI FIGURE 2 Edgewood Drive Study Report Land Use and Impervious Area TOWN OF WAUPUN CITY OF WAUPUN ScA VgA LvB2 LvB LvB ScA LvB ScA VgB LvB2 ScB VgA LvB2 LvB2 PhA LvB2 LvB ScA PhA PhA ScB VgA VgA Watershed Study Area City of Waupun Hydrologic Soil Group B C 0 125 250 Feet Printed By: aschaefer, File: G:\00\00212\00212155\GIS\7_00212155_EdgewoodDrive_Waupun.aprx, 00212155_Figure3_Site Soils, Site Soils Print Date: 6/27/2025 Data Sources: Aerial: WI DNR (2018) Watershed Boundaries: MSA Soils: NRCS (2025) City of Waupun Fond du Lac County, WI FIGURE 3 Edgewood Drive Study Report Site Soils TOWN OF WAUPUN CITY OF WAUPUN Watershed Study Area City of Waupun Modeled Nodes Modeled Links Maximum Water Depth (ft) 0 - 0.1 0.1 - 0.3 0.3 - 0.5 0.5 - 1 1 - 2 2 - 5 0 125 250 Feet Printed By: aschaefer, File: G:\00\00212\00212155\GIS\7_00212155_EdgewoodDrive_Waupun.aprx, 00212155_Figure9_100YRInundation - New Inlet Location, PR 100YR Inundation - New Inlet Location Print Date: 6/30/2025 Data Sources: Aerial: WI DNR (2018) Watershed Boundaries: MSA Storm Drainage System: MSA and City of Waupun City of Waupun Dodge County, WI FIGURE 9 Edgewood Drive Study Report Proposed Conditions 1% AEP New Inlet Location Item Quantity Units Unit Cost Estimated Cost Mobilization, Bonds, Insurance 1 EA 8,200.00$ 8,200.00$ Erosion Control 1 EA 5,000.00$ 5,000.00$ Embankment Fill 700 CY 6.00$ 4,200.00$ Common Excavation 17900 CY 6.00$ 107,400.00$ RCP Piping (24") 50 LF 150.00$ 7,500.00$ Control Structure 1 EA 10,000.00$ 10,000.00$ Restoration 14500 SY 2.00$ 29,000.00$ 25% Construction Contingency 43,000.00$ Engineering 40,000.00$ TOTAL 254,300.00$ Assumes on-site disposal of excavated material Assumes no bedrock Assumes no groundwater dewatering Assumes no pond liner required Proposed Pond North of Edgewood Drive Project Cost Estimate Prepared by MSA Professional Services, Inc. July 1, 2025 SS 895 891 892 893894 896897898 0408020 © MSA Professional Services, Inc.www.msa-ps.comENGINEERING | ARCHITECTURE | SURVEYINGFUNDING | PLANNING | ENVIRONMENTALEDGEWOOD DRIVE PONDCITY OF WAUPUNWAUPUN, FOND DU LAC COUNTY, WI PROJECT NO.00212148SHEET1 DRAWN BY: AES DESIGNED BY: AES CHECKED BY: EJTCONCEPTUAL PLAN PLOT DATE: 10/29/2026 9:44 AM, G:\00\00212\00212155\CADD\C3D\00212155_Design.dwg PROJECT DATE: OCTOBER 2026NO.REVISIONBY .. .. .. DATE...... EX. STORM INLETRIM = 889.52'24" RCP INV. = 884.95' PROPOSED POND OUTLET STRUCTURE36" DIA. RISER EL. = 887.5'6" ORIFICE EL. = 885.5'18" RCP INV. = 885.5' PROPOSED POND2.4 ACRESNWL = 885.5'TOP OF BERM = 891.0'100YR WSE = 889.9' 891890 885880 892 18" RCP INV. = 885.3' 885.5 60 LF 18" RCP POND BOUNDARY SHOWN INALTERNATIVES ANALYSIS 0 50 100 150 200 250 300 350 Accident/Police Aquatic Center Building Maintenance Curb & Gutter Development Equipment / Vehicle Maintenance Events Garbage/Recycling/Bulk Pick-Up Mowing Park Maintenance Signs Snow/Ice Removal Storm Sewer Street Maintenance Trees Yard Waste Work Orders Employee Hours # of Work Orders October 2026 $0.00 $2,000.00 $4,000.00 $6,000.00 $8,000.00 $10,000.00 $12,000.00 $14,000.00 Cost Employee Cost Equipment Cost Material Cost PO Cost October 2026

Source: City of Waupun website. First collected Nov 8, 2026.