RecordWell Data

Waupun Utilities Commission

City of Waupun · Fond du Lac County · meeting of Nov 9, 2026 · Agendas

Open the original document More from City of Waupun

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

A G E N D A WAUPUN UTILITIES COMMISSION MEETING 817 S. Madison Street Monday, November 09, 2026 at 4:00 PM There is a regular commission meeting scheduled for Monday, November 9, 2026 at 4:00 p.m. at the Waupun Utilities Administrative Building, with option to join via virtual and teleconference. Instructions to join the meeting are provided below: Join Zoom Meeting https://us02web.zoom.us/j/89819520743?pwd=amNEeGRJTzBNaVdhUHhpcUdDNGNwdz09 By Phone: 1 312 626 6799 Meeting ID: 898 1952 0743 Passcode: 061341 CALL TO ORDER ROLL CALL OF COMMISSIONERS PERSONS WISHING TO ADDRESS COMMISSION – State name, address, and subject of comments (2 Minutes) PRESENTATION 1. Summary of Resolution Authorizing the Redemption of 2019 Water and Electric System Revenue Bonds – Carol Wirth, President, Wisconsin Public Finance Professionals, LLC CONSIDERATION – ACTION 2. Recommendation to Common Council for Approval of Resolution Authorizing the Redemption of the Water and Electric System Revenue Refunding Bonds, Series 2019B, Dated December 4, 2019 3. Approval of Minutes from October 12, 2026 4. Approval of October 2026 Accounts Payable 5. Finance Director Report and Approval of Monthly Financial Results 6. Approval of the 2027 Electric, Water, and Sewer Utilities Budget 7. Approval of Sewer Rate Adjustment Resolution for the 2027 Test Year Wastewater Rate Analysis for Recommendation to the Common Council 8. Approval of Revisions to Waupun Utilities Compensation for Standby Policy 9. Approval of Cell Phone Reimbursement Policy DISCUSSION 10. December 14, 2026, Commission Meeting DEPARTMENT REPORTS 11. General Manager Report 12. Electric Operations Report 13. Treatment Facilities Report 14. Water and Sewer Operations Report 15. Energy Services Manager Report ADJOURNMENT Upon reasonable notice, efforts will be made to accommodate disabled individuals through appropriate aids and services. For additional information, contact the General Manager at 920-324-7920. Summary Explanation Resolution Authorizing the Redemption of 2019 Water and Electric System Revenue Bonds (“2019 Bonds”) Waupun Utilities Commission - November 9, 2026 Waupun Common Council – November 10, 2026 Presented by: Carol Ann Wirth, President Wisconsin Public Finance Professionals, LLC (“WPFP”) The 2019 Bonds were originally issued to refinance Water and Electric Revenue Bonds issued in 2014 and 2016. The 2019 Bonds have principal payments due on March 1, 2027 through 2031 in the total amount of $2,015,000, at interest rates ranging from 2.00% - 2.125%. The Bonds due on March 1, 2028 through 2031 are subject to prepayment beginning March 1, 2027 whereby they may be “redeemed,” stopping the remaining interest payments ($85,937). The 2019 Bonds were issued under the provisions of a 1993 revenue bond resolution, which continued to be extended with the issuance of subsequent revenue bond resolutions. The 1993 revenue bond resolution pledges the revenues of both the water and electric systems for each financing, regardless of the purpose of the project being financed. Also, it does not allow for the potential future issuance of short-term revenue obligations, or to participate in potential future State or Federal Loan programs on a “parity” or “equal” basis. Attached is a resolution authorizing the redemption of the 2019 Bonds at the earliest prepayment date of March 1, 2027. The process requires the notice of redemption (Exhibit A) to be provided to The Depository Trust Company and to the Municipal Securities Rulemaking Board’s website, not more than 60 days nor less than 30 days prior to March 1, 2027. This provides notification to the existing bondholders that their interest will stop on that date. WPFP will assist the City with processing this notice on January 7, 2027. On March 1, 2027, the 2019 Bonds will be paid off with Water Utility funds on hand and the provisions included in the 1993 revenue bond resolution will no longer be carried forward into any future borrowing. The City of Waupun, together with the Waupun Utilities Commission, is preparing to issue Electric System Revenue Bonds in early 2027 to finance the new sub-station and transformers, under the terms of a new revenue bond resolution pledging only the revenues of the electric utility. It is anticipated this authorizing resolution will be presented to the Waupun Utilities Commission and the Waupun Common Council in early January, 2027. WPFP will serve as the Municipal Advisor for this issue and will coordinate the financing with the City, Utilities Commission, Quarles & Brady (Bond Counsel) and Moody’s Investors Service. QB\105507745.1 RESOLUTION NO. 11-10-26-02 RESOLUTION AUTHORIZING THE REDEMPTION OF THE WATER AND ELECTRIC SYSTEM REVENUE REFUNDING BONDS, SERIES 2019B, DATED DECEMBER 4, 2019 WHEREAS, the City of Waupun, Dodge and Fond du Lac Counties, Wisconsin (the "City") has outstanding its Water and Electric System Revenue Refunding Bonds, Series 2019B, dated December 4, 2019 (the "2019B Bonds"); WHEREAS, the Common Council has determined that it is necessary and desirable to call the 2019B Bonds maturing in the years 2028 through 2031 for redemption on March 1, 2027 with funds of the City on hand; NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City, that the 2019B Bonds maturing in the years 2028 through 2031 are called for prior payment on March 1, 2027 at the price of par plus accrued interest to the date of redemption. The City hereby directs the City Clerk to cause timely notice of redemption, in substantially the form attached hereto as Exhibit A and incorporated herein by this reference (the "Notice"), to be provided at the times, to the parties and in the manner set forth on the Notice. Further, the City Clerk shall cause the funds necessary to redeem the 2019B Bonds to be provided to The Depository Trust Company. Adopted, approved and recorded November 10, 2026. _____________________________ Rohn W. Bishop Mayor ATTEST: ____________________________ Angela J. Hull City Clerk (SEAL) QB\105507745.1 EXHIBIT A NOTICE OF FULL CALL* Regarding CITY OF WAUPUN DODGE AND FOND DU LAC COUNTIES, WISCONSIN WATER AND ELECTRIC SYSTEM REVENUE REFUNDING BONDS, SERIES 2019B, DATED DECEMBER 4, 2019 NOTICE IS HEREBY GIVEN that the Bonds of the above-referenced issue which mature on the dates and in the amounts; bear interest at the rates; and have CUSIP Nos. as set forth below have been called by the City for prior payment on March 1, 2027 at a redemption price equal to 100% of the principal amount thereof plus accrued interest to the date of prepayment: Maturity Date Principal Amount Interest Rate CUSIP No. 03/01/2028 $395,000 2.00 % 943277DH3 03/01/2029 405,000 2.00 943277DJ9 03/01/2030 410,000 2.125 943277DK6 03/01/2031 420,000 2.125 943277DL4 The City shall deposit federal or other immediately available funds sufficient for such redemption at the office of The Depository Trust Company on or before March 1, 2027. Said Bonds will cease to bear interest on March 1, 2027. By Order of the Common Council City of Waupun City Clerk Dated ________________________ _____________ * To be provided by registered or certified mail, overnight express delivery, facsimile transmission, electronic transmission or in any other manner required by The Depository Trust Company, to The Depository Trust Company, Attn: Supervisor, Call Notification Department, 570 Washington Blvd., Jersey City, NJ 07310, not less than thirty (30) days nor more than sixty (60) days prior to March 1, 2027 and to the MSRB electronically through the Electronic Municipal Market Access (EMMA) System website at www.emma.msrb.org. Minutes of a Regular Meeting of the Waupun Utilities Commission Monday, October 12, 2026 Meeting called to order by President Heeringa at 4:00 p.m. Present: Commissioners Heeringa, Homan, Kunz, Mielke, Siebers, and Thurmer Absent with notice: Commissioner Daane Visitor: Michael Miller (virtual) Motion by Siebers, seconded by Homan, and unanimously carried to approve the minutes from the September 14, 2026 meeting. Motion by Kunz, seconded by Siebers, and unanimously carried to approve the bills for the month of September 2026 as presented. Motion by Thurmer, seconded by Kunz, and unanimously carried, year-to-date financial reports through August 2026 were approved as presented by Finance Director Stanek. Electric operating income was $549,700. Water operating income was $372,200. Sewer operating income was $94,100. General Manager Brooks provided an update on the solicitation for proposals for a new 60' x 120' x 18' commercial base building for utility operations and equipment storage. One proposal was received, and staff recommended acceptance. Motion by Kunz, seconded by Homan, and unanimously carried to award the contract for the 60’ x 120’ x 18’ Design-Build Base Building Project to M.P.B Builders, Inc. in the amount of $335,798.00, subject to final contract execution and required documentation. General Manager Brooks presented the proposed Waupun Utilities Employee Wellness Program Policy, modeled after the City of Waupun's policy approved September 29, 2026. The policy encourages annual wellness checks for employees and their covered spouses, with reduced employee premium contributions for those who complete the requirements. Motion by Thurmer, seconded by Mielke, and unanimously carried to approve the policy. Finance Director Stanek proposed amending the 2026 Water Utility budget to include rehabilitation and maintenance costs for Wells #2 and #3, not to exceed $120,000. Motion by Siebers, seconded by Thurmer, and unanimously carried to approve the water utility budget amendment. General Manager Brooks presented a revised Standby Policy transitioning from percentage- based compensation to straight-time hourly compensation by department. The change would simplify accounting and eliminate manual overtime calculations. The Commission reached a general consensus to proceed with legal review, with implementation planned for January 2027. General Manager Brooks presented a proposed employee cell phone reimbursement policy of $30 per month to help offset personal cell phone costs associated with business use, including communication, access to Utility systems, notifications, and operational needs outside regular Waupun Utilities Commission October 12, 2026 Meeting Minutes Page 2 work hours. The expense is included in the 2027 preliminary budget. The Commission reached a general consensus to retain the reimbursement in the 2027 budget. General Manager Brooks presented a comparison of locate requests, employee hours, and associated labor costs from 2021 through 2026 to date. Staff will explore alternatives for locating electric, water, and sewer service lines in 2027. The Commission reached a general consensus to include funding in the 2027 budget to evaluate potential alternatives that could improve efficiency and reduce costs. Finance Director Stanek presented the 2027 preliminary budget, reflecting a projected increase of $4,402,300, or 22.0%, over the 2026 budget. Key items included wage adjustments, increased health insurance costs, operating and maintenance expenses, projected revenues, capital equipment and vehicle replacements, debt financing and construction for the new Business Park substation and voltage conversion, water debt payments, and a proposed 5% increase to all sewer rates with separate increase to the fixed charge for Major Contributing Industries. The Commission reached a general consensus to move forward with the preliminary budget as presented. General Manager Brooks highlighted a meeting with a longstanding customer regarding potential equipment replacement and relocation to improve system reliability and strengthen infrastructure. Electric Operations Superintendent Vande Kolk presented report highlights, including safety precautions taken in response to a recent gas main break and the purchase, delivery, and replacement of a transformer, including removal and disposal of the old unit. General Manager Brooks presented highlights from Treatment Facilities Superintendent Sytsma’s report, including repairs at Well #4, findings at Wells #2 and #3, and the SCADA radio system upgrade. General Manager Brooks summarized the Water and Sewer Operations Report, noting routine operations, assistance to other departments with the Vactor truck, and continued efforts to identify customer-owned service lines for required WDNR reporting. General Manager Brooks highlighted items from the Energy Services Manager’s report, including the Public Power prize raffle, third-grade coloring contest, and Energy Assistance Event. Motion by Homan, seconded by Thurmer, and unanimously carried to adjourn the meeting at 5:58 p.m. The next regular commission meeting will be held on November 9, 2026, at 4:00 p.m. Jen Benson Office & Customer Service Supervisor WAUPUN UTILITIES Paid Invoice Report - COMMISSION Page: 1 Check issue dates: 10/1/2026 - 10/31/2026 Nov 03, 2026 01:33PM Vendor Invoice Invoice Invoice Check Check Check Number Number Description Date Amount Amount Number Issue Date AIR PRODUCTS AND CHEMICALS INC 840 436579385 CARBON DIOXIDE - ABNR (39960 LBS) 10/12/2026 5,405.83 5,405.83 1256 10/12/2026 Total AIR PRODUCTS AND CHEMICALS INC: 5,405.83 5,405.83 AIRGAS USA INC 855 5527595963 ACETYLENE/OXYGEN/NITROGEN-E 10/12/2026 68.25 68.25 51398 10/12/2026 5527595963 ACETYLENE/OXYGEN/NITROGEN-W 10/12/2026 68.25 68.25 51398 10/12/2026 5527595963 ACETYLENE/OXYGEN/NITROGEN-S 10/12/2026 68.25 68.25 51398 10/12/2026 Total AIRGAS USA INC: 204.75 204.75 ALLIANT ENERGY 900 183035.09302026 GAS UTILITY - WATER PLANT 10/12/2026 124.31 124.31 1101220210/12/2026 3261389217.09302WWTF- PROCESS BLD, GREEN HOUSE AND PUMP BLD 10/12/2026 111.16 111.161101220210/12/2026 4370000.09302026 GAS UTIL BILL @ N2721 FDL ST - ADMIN/DIGESTER BLD 10/12/2026 174.46 174.461101220210/12/2026 590516.09302026 SPLIT DISTRIBUTION- MAIN BLD - 2% E 10/12/2026 1.24 1.24 1101220210/12/2026 590516.09302026 SPLIT DISTRIBUTION- MAIN BLD - 2% S 10/12/2026 1.24 1.24 1101220210/12/2026 590516.09302026 SPLIT DISTRIBUTION- MAIN BLD - 2% W 10/12/2026 1.24 1.24 1101220210/12/2026 590516.09302026 SPLIT DISTRIBUTION- MAIN BLD - 27% E 10/12/2026 16.74 16.74 1101220210/12/2026 590516.09302026 SPLIT DISTRIBUTION- MAIN BLD - 27% S 10/12/2026 16.74 16.74 1101220210/12/2026 590516.09302026 SPLIT DISTRIBUTION- MAIN BLD - 27% W 10/12/2026 16.74 16.74 1101220210/12/2026 590516.09302026 SPLIT DISTRIBUTION- MAIN BLD - 4% S 10/12/2026 2.48 2.48 1101220210/12/2026 590516.09302026 SPLIT DISTRIBUTION- MAIN BLD - 4% W 10/12/2026 2.48 2.48 1101220210/12/2026 590516.09302026 SPLIT DISTRIBUTION- MAIN BLD - 5% E 10/12/2026 3.11 3.11 1101220210/12/2026 80105.09302026 GAS UTILITY FOR WELLHOUSE #5 10/12/2026 14.22 14.22 1101220210/12/2026 931084.09302026 GAS UTIL @ N2721 FDL ST - FILTER & DEWATERING BLD 10/12/2026 29.97 29.971101220210/12/2026 Port Sub Rental 6.2PORTABLE SUB RENTAL 6.26-11.26 (18 WKS) 10/30/2026 90,000.00 90,000.001030202610/30/2026 Total ALLIANT ENERGY: 90,516.13 90,516.13 ALTERNATIVE TECHNOLOGIES INC. 1000 59911 SUBSTATION SAMPLING SERVICES 10/30/2026 880.00 880.00 51414 10/30/2026 Total ALTERNATIVE TECHNOLOGIES INC.: 880.00 880.00 AMAZON CAPITAL SERVICES 1015 11N1-XNPP-6NVM 2027 PLANNER - ACCOUNTANT 10/30/2026 5.50 5.50 1280 10/30/2026 11N1-XNPP-6NVM 2027 PLANNER - ACCOUNTANT 10/30/2026 4.37 4.37 1280 10/30/2026 11N1-XNPP-6NVM 2027 PLANNER - ACCOUNTANT 10/30/2026 4.22 4.22 1280 10/30/2026 1C9N-MTYV-43XV SHEET METAL SCREWS 10/12/2026 31.98 31.98 1257 10/12/2026 1ND3-4D99-DDRC COMPUTER ADAPTOR FOR CONFERENCE ROOM 10/12/2026 10.92 10.92 1257 10/12/2026 1ND3-4D99-DDRC COMPUTER ADAPTOR FOR CONFERENCE ROOM 10/12/2026 8.68 8.68 1257 10/12/2026 1ND3-4D99-DDRC COMPUTER ADAPTOR FOR CONFERENCE ROOM 10/12/2026 8.39 8.39 1257 10/12/2026 1QY7-R6M7-RPV9 PLC BATTERIES - WWTP 10/30/2026 69.69 69.69 1280 10/30/2026 1W7N-JH9G-CMPM DONATION ITEM - KICKIN' FOR KEVIN 2026 10/12/2026 38.24 38.24 1257 10/12/2026 1XLV-GGWF-6CFQSELF-SEAL BUBBLE POUCHES - SENIOR CENTER EVEN10/12/2026 49.98 49.98 1257 10/12/2026 Total AMAZON CAPITAL SERVICES: 231.97 231.97 AT&T MOBILITY 1560287362417474X092CELLPHONE MONTHLY EXPENSE - E 10/12/2026 155.32 155.32 1101220210/12/2026 287362417474X092CELLPHONE MONTHLY EXPENSE - W 10/12/2026 81.01 81.01 1101220210/12/2026 287362417474X092CELLPHONE MONTHLY EXPENSE - S 10/12/2026 80.52 80.52 1101220210/12/2026 Total AT&T MOBILITY: 316.85 316.85 WAUPUN UTILITIES Paid Invoice Report - COMMISSION Page: 2 Check issue dates: 10/1/2026 - 10/31/2026 Nov 03, 2026 01:33PM Vendor Invoice Invoice Invoice Check Check Check Number Number Description Date Amount Amount Number Issue Date BELL LUMBER & POLE COMPANY 2550 603080 35 FT WOOD POLE (10) 10/30/2026 3,890.00 3,890.00 51415 10/30/2026 603080 45 FT WOOD POLE (20) 10/30/2026 12,360.00 12,360.00 51415 10/30/2026 603080 FREIGHT 10/30/2026 5,995.05 5,995.05 51415 10/30/2026 Total BELL LUMBER & POLE COMPANY: 22,245.05 22,245.05 BOARDMAN & CLARK LLP 3200 325105 PROFESSIONAL SERVICES - POLE ATTACH AGREEMENT10/30/2026 1,255.50 1,255.50 1281 10/30/2026 Total BOARDMAN & CLARK LLP: 1,255.50 1,255.50 BORDER STATES ELECTRIC SUPPLY 3300 933180873 COVERS FOR HTAP & D DIE (100) 10/12/2026 208.00 208.00 1258 10/12/2026 933180873 CONNECTORS (250) 10/12/2026 467.50 467.50 1258 10/12/2026 933180873 COVERS FOR HTAP & D DIE (200) 10/12/2026 416.00 416.00 1258 10/12/2026 933280469 ELECTRIC CONNECTORS (15) 10/30/2026 156.60 156.60 1282 10/30/2026 933337786 ELECTRIC CONNECTORS (80) 10/30/2026 901.60 901.60 1282 10/30/2026 Total BORDER STATES ELECTRIC SUPPLY: 2,149.70 2,149.70 BROOKS SHOES & REPAIR 3550 59054 SAFETY BOOTS - C. JAHN 10/30/2026 175.00 175.00 1283 10/30/2026 Total BROOKS SHOES & REPAIR: 175.00 175.00 CAREW CONCRETE & SUPPLY CO 5600 030522 AG- 3/4" CRUSHER (QTY 16.29) 10/30/2026 65.16 65.16 1284 10/30/2026 030522 AG- 3/4" CRUSHER (QTY 16.29) 10/30/2026 65.16 65.16 1284 10/30/2026 27661 SONOTUBE - RAINGUARD (11) - SHALER DR 10/12/2026 1,925.00 1,925.00 1259 10/12/2026 27717 AG- 3/4" CRUSHER (QTY 17.95) 10/12/2026 143.60 143.60 1259 10/12/2026 28656 SCREENINGS (QTY 16.66) 10/12/2026 91.63 91.63 1259 10/12/2026 28658 SCREENINGS (QTY 16.02 + 15.29) 10/12/2026 172.21 172.21 1259 10/12/2026 28660 3/4 CRUSHER (QTY 17.37+17.15) 10/12/2026 276.16 276.16 1259 10/12/2026 Total CAREW CONCRETE & SUPPLY CO: 2,738.92 2,738.92 COLUMN SOFTWARE PBC 6115 A1CF33FA-0031 LEGAL NOTICE - BID DOCS FOR SUB MATERIALS PKGE 10/30/2026 110.76 110.76 1286 10/30/2026 A1CF33FA-0032 MNTHLY MEETING MINS-E 10/30/2026 68.72 68.72 1286 10/30/2026 A1CF33FA-0032 MNTHLY MEETING MINS-W 10/30/2026 54.62 54.62 1286 10/30/2026 A1CF33FA-0032 MNTHLY MEETING MINS-S 10/30/2026 52.86 52.86 1286 10/30/2026 Total COLUMN SOFTWARE PBC: 286.96 286.96 DIGGERS HOTLINE INC. 7300 260931801 MONTHLY LOCATE TICKET CHRGS 10/12/2026 233.70 233.70 51399 10/12/2026 Total DIGGERS HOTLINE INC.: 233.70 233.70 DNR 7475VELEKE RENEWAL RENEW WASTEWATER OPERATOR CERT - VELEKE 10/12/2026 45.00 45.00 51400 10/12/2026 Total DNR: 45.00 45.00 MARTENS ACE HARDWARE 9200 253241 BATTERIES FOR GENERAL USE 10/12/2026 13.99 13.99 1268 10/12/2026 WAUPUN UTILITIES Paid Invoice Report - COMMISSION Page: 3 Check issue dates: 10/1/2026 - 10/31/2026 Nov 03, 2026 01:33PM Vendor Invoice Invoice Invoice Check Check Check Number Number Description Date Amount Amount Number Issue Date 253241 WWTP ABNR CENTRIFUGE #2 ADAPTORS & TEE'S 10/12/2026 41.14 41.14 1268 10/12/2026 253523 SENIOR EXPO - LED BULBS 10/30/2026 243.81 243.81 1296 10/30/2026 253525WWTP PROCESS BUILDINGS WATER LINE VALVE REPLA10/12/2026 19.99 19.99 1268 10/12/2026 253527 PUBLIC POWER RAFFLE - SNOW BLOWER 10/30/2026 699.00 699.00 1296 10/30/2026 253565 #171 PAINT 10/30/2026 8.99 8.99 1296 10/30/2026 253577 FASTENERS FOR 171 & 172 10/30/2026 24.00 24.00 1296 10/30/2026 253600 #23 VAC TRUCK - CONNECTION 10/12/2026 .30 .30 1268 10/12/2026 253600 #23 VAC TRUCK - CONNECTION 10/12/2026 .30 .30 1268 10/12/2026 253600 #23 VAC TRUCK - CONNECTION 10/12/2026 1.99 1.99 1268 10/12/2026 253727 MORTAR MIX 10/30/2026 79.92 79.92 1296 10/30/2026 253826 #6 TAPE MEASURES 10/30/2026 21.99 21.99 1296 10/30/2026 253826 #6 TAPE MEASURES 10/30/2026 21.99 21.99 1296 10/30/2026 253930 #156 & #157 TOOLS 10/30/2026 35.98 35.98 1296 10/30/2026 Total MARTENS ACE HARDWARE: 1,213.39 1,213.39 FERGUSON WATERWORKS #1476 9480 487197 26" SECTION VALVE BOX TOP - SECONDARY DOME (5) 10/12/2026 625.00 625.00 1260 10/12/2026 487197 24" VALVE BOX EXTENSION (2) 10/12/2026 186.00 186.00 1260 10/12/2026 487197 18" VALVE BOX EXTENSION (3) 10/12/2026 276.00 276.00 1260 10/12/2026 487197 8" SLIDE BY (4) 10/12/2026 244.00 244.00 1260 10/12/2026 Total FERGUSON WATERWORKS #1476: 1,331.00 1,331.00 FLOTTWEG SEPARATION TECHNOLOGY 9860 85509 ABNR CENTRIFUGE #1 SEALING, WEAR PLATE & VALVE 10/12/2026 7,838.17 7,838.17 1261 10/12/2026 Total FLOTTWEG SEPARATION TECHNOLOGY: 7,838.17 7,838.17 FORSTER ELECTRICAL ENGINEERING 9885 28108 NEW SUBSTATION DESIGN & ENGINEERING W08-25A 10/12/2026 12,757.50 12,757.50 1262 10/12/2026 28109 ENGINEERING - TRANSFORMER RESOLUTION - INSURA10/12/2026 870.00 870.00 1262 10/12/2026 28126 JOINT USE POLE ATTACHMENT DETAIL - TDS 10/12/2026 1,465.00 1,465.00 1262 10/12/2026 Total FORSTER ELECTRICAL ENGINEERING: 15,092.50 15,092.50 GFL ENVIRONMENTAL 11300 U90000346847 DUMPSTER - OFFICE BLDG-E 40% 10/30/2026 364.04 364.04 1287 10/30/2026 U90000346847 DUMPSTER - OFFICE BLDG-S 30% 10/30/2026 273.03 273.03 1287 10/30/2026 U90000346847 DUMPSTER - OFFICE BLDG-W 30% 10/30/2026 273.04 273.04 1287 10/30/2026 U90000347074 DUMPSTER - WWTP 10/30/2026 4,415.53 4,415.53 1287 10/30/2026 Total GFL ENVIRONMENTAL: 5,325.64 5,325.64 GORDON FLESCH COMPANY INC 11325 IN15797765 MTHLY CLICK COUNTS -E (39%) 10/12/2026 17.10 17.10 1263 10/12/2026 IN15797765 MTHLY CLICK COUNTS -S (30%) 10/12/2026 13.16 13.16 1263 10/12/2026 IN15797765 MTHLY CLICK COUNTS -W (31%) 10/12/2026 13.60 13.60 1263 10/12/2026 Total GORDON FLESCH COMPANY INC: 43.86 43.86 GUENTHER SUPPLY INC 11700 INV-551697 WWTP REPLACEMENT PVC SITE GLASS FOR AMMONIC 10/12/2026 108.05 108.05 1264 10/12/2026 Total GUENTHER SUPPLY INC: 108.05 108.05 WAUPUN UTILITIES Paid Invoice Report - COMMISSION Page: 4 Check issue dates: 10/1/2026 - 10/31/2026 Nov 03, 2026 01:33PM Vendor Invoice Invoice Invoice Check Check Check Number Number Description Date Amount Amount Number Issue Date GUTHS CANDY LLC 11850 28450 CUSTOMER MEETING SUPPLIES 10/12/2026 35.00 35.00 51401 10/12/2026 Total GUTHS CANDY LLC: 35.00 35.00 HARN R/O SYSTEMS INC. 12140 SINV-000347 (4) 500 LB DRUMS VITEC 3000 10/30/2026 4,600.00 4,600.00 1288 10/30/2026 Total HARN R/O SYSTEMS INC.: 4,600.00 4,600.00 HYDRITE CHEMICAL CO 13980 2026000071736 AMMONIUM HYDROXIDE - ABNR (29420 LBS) 10/30/2026 9,125.00 9,125.00 1289 10/30/2026 Total HYDRITE CHEMICAL CO: 9,125.00 9,125.00 HYDROCORP LLC 13985 CI-16348 CROSS CNNCTN CONTROL PROG & INSP (NON-RES) 10/12/2026 1,304.00 1,304.00 1265 10/12/2026 CI-16350CROSS CNNCTN CONTROL PROG & INSP (RESIDENTIAL)10/12/2026 950.00 950.00 1265 10/12/2026 CI-16505 AF HOSE BIBB VACUUM BREAKER 10/30/2026 1,162.00 1,162.00 1290 10/30/2026 Total HYDROCORP LLC: 3,416.00 3,416.00 ICS MEDICAL ANSWERING SERVICE LLC 14120 252400101101 ANSWERING SERVICE - E 10/30/2026 93.99 93.99 1291 10/30/2026 252400101101 ANSWERING SERVICE - W 10/30/2026 74.71 74.71 1291 10/30/2026 252400101101 ANSWERING SERVICE - S 10/30/2026 72.30 72.30 1291 10/30/2026 Total ICS MEDICAL ANSWERING SERVICE LLC: 241.00 241.00 INFOSEND INC 14490 319603 BILL PRINT & POSTAGE-W (31%) 10/30/2026 1,012.61 1,012.61 1292 10/30/2026 319603 BILL PRINT & POSTAGE-S (30%) 10/30/2026 979.94 979.94 1292 10/30/2026 319603 BILL PRINT & POSTAGE-E (39%) 10/30/2026 1,273.92 1,273.92 1292 10/30/2026 Total INFOSEND INC: 3,266.47 3,266.47 ITU ABSORB TECH INC. 14950 8806929 SHOP TOWELS MTHLY RENTAL FEE-E 10/30/2026 14.48 14.48 1293 10/30/2026 8806929 SHOP TOWELS MTHLY RENTAL FEE-W 10/30/2026 14.48 14.48 1293 10/30/2026 8806929 SHOP TOWELS MTHLY RENTAL FEE-S 10/30/2026 14.47 14.47 1293 10/30/2026 8806930 SHOP TOWELS FOR WWTP 10/30/2026 25.61 25.61 1293 10/30/2026 Total ITU ABSORB TECH INC.: 69.04 69.04 J & H CONTROLS INC 16000 10000028634 BUILDING PREVENTATIVE MAINT. - E 10/30/2026 209.20 209.20 1294 10/30/2026 10000028634 BUILDING PREVENTATIVE MAINT. - S 10/30/2026 156.90 156.90 1294 10/30/2026 10000028634 BUILDING PREVENTATIVE MAINT. - W 10/30/2026 156.90 156.90 1294 10/30/2026 10000028635 BUILDING MAINT MTHLY CHRG-WTP 10/30/2026 204.00 204.00 1294 10/30/2026 10000028636 BUILDING MAINT MTHLY CHRG-WWTF (SEPT, OCT, NOV) 10/30/2026 1,443.00 1,443.00 1294 10/30/2026 Total J & H CONTROLS INC: 2,170.00 2,170.00 J HARLEN COMPANY INC 16150 1838112 LANYARDS - ELECTRIC CREW HARNESS V(4) 10/12/2026 815.96 815.96 1266 10/12/2026 WAUPUN UTILITIES Paid Invoice Report - COMMISSION Page: 5 Check issue dates: 10/1/2026 - 10/31/2026 Nov 03, 2026 01:33PM Vendor Invoice Invoice Invoice Check Check Check Number Number Description Date Amount Amount Number Issue Date Total J HARLEN COMPANY INC: 815.96 815.96 K BROWN PLUMBING LLC 17070 2026-416 ADMIN BUILDING BATHROOM REPAIR 10/30/2026 65.40 65.40 51416 10/30/2026 2026-416 ADMIN BUILDING BATHROOM REPAIR 10/30/2026 49.05 49.05 51416 10/30/2026 2026-416 ADMIN BUILDING BATHROOM REPAIR 10/30/2026 49.05 49.05 51416 10/30/2026 Total K BROWN PLUMBING LLC: 163.50 163.50 KEMIRA WATER SOLUTIONS INC. 17513 9017961835 FERROUS CHLORIDE - WWTF (47300 LBS) 10/12/2026 11,160.32 11,160.32 1267 10/12/2026 Total KEMIRA WATER SOLUTIONS INC.: 11,160.32 11,160.32 KNOWLES PRODUCE & TRADING CO 17650 CT48934 #15 SHOCK ABSORBER 10/30/2026 60.90 60.90 51417 10/30/2026 CT48934 #15 SHOCK ABSORBER 10/30/2026 60.89 60.89 51417 10/30/2026 CT48934 #15 SHOCK ABSORBER 10/30/2026 60.89 60.89 51417 10/30/2026 Total KNOWLES PRODUCE & TRADING CO: 182.68 182.68 M.T.S.R. LLC 19075 INV4100 #150 PRESSURIZED FUEL SYSTEM & TESTED FOR LEAK10/30/2026 148.40 148.40 1295 10/30/2026 Total M.T.S.R. LLC: 148.40 148.40 MARSHALL-BOND PUMPS INC. 20035 41217.0 (4) URETHANE CHECK BALLS FOR PRIMARY SLUDGE PU10/30/2026 1,501.81 1,501.81 51418 10/30/2026 Total MARSHALL-BOND PUMPS INC.: 1,501.81 1,501.81 MARTELLE WATER TREATMENT INC. 20250 32620 CASTIC SODA 50% BULK - WTF (WATER PH ADJUSTMEN10/12/2026 3,448.72 3,448.72 51402 10/12/2026 Total MARTELLE WATER TREATMENT INC.: 3,448.72 3,448.72 MEUW 23500 6355 LEADERSHIP THROUGH COACHING - BENSON 10/30/2026 88.50 88.50 1297 10/30/2026 6355 LEADERSHIP THROUGH COACHING - BENSON 10/30/2026 91.45 91.45 1297 10/30/2026 6355 LEADERSHIP THROUGH COACHING - BENSON 10/30/2026 115.05 115.05 1297 10/30/2026 6355 LEADERSHIP THROUGH COACHING - VANDE KOLK 10/30/2026 295.00 295.00 1297 10/30/2026 Total MEUW: 590.00 590.00 MIDWEST OVERHEAD DOORS INC 24300 201394 GARAGE DOOR REPAIR MAIN BLD - CLEAN LIMIT SHAFT 10/30/2026 165.00 165.00 51419 10/30/2026 201394GARAGE DOOR REPAIR MAIN BLD - CLEAN LIMIT SHAFT 10/30/2026 123.75 123.75 51419 10/30/2026 201394GARAGE DOOR REPAIR MAIN BLD - CLEAN LIMIT SHAFT 10/30/2026 123.75 123.75 51419 10/30/2026 Total MIDWEST OVERHEAD DOORS INC: 412.50 412.50 SECURIAN FINANCIAL GROUP INC 252000283832L-1027 OCBASIC GROUP LIFE INS PREMIUM 10/12/2026 321.78 321.78 51404 10/12/2026 0283832L-1027 OCEMPLOYER CONTRIBUTION 20%-E 10/12/2026 18.11 18.11 51404 10/12/2026 0283832L-1027 OCEMPLOYER CONTRIBUTION 20%-W 10/12/2026 14.40 14.40 51404 10/12/2026 0283832L-1027 OCEMPLOYER CONTRIBUTION 20%-S 10/12/2026 13.93 13.93 51404 10/12/2026 WAUPUN UTILITIES Paid Invoice Report - COMMISSION Page: 6 Check issue dates: 10/1/2026 - 10/31/2026 Nov 03, 2026 01:33PM Vendor Invoice Invoice Invoice Check Check Check Number Number Description Date Amount Amount Number Issue Date Total SECURIAN FINANCIAL GROUP INC: 368.22 368.22 MSA PROFESSIONAL SERVICES INC 28200 034246 ALLEYWAY EASEMENT 10/30/2026 360.00 360.00 1298 10/30/2026 034246 ALLEYWAY EASEMENT 10/30/2026 360.00 360.00 1298 10/30/2026 Total MSA PROFESSIONAL SERVICES INC: 720.00 720.00 MULDER, JONATHAN 29240 14020380-026 REFUND 414 CARRINGTON ST 10/30/2026 89.44 89.44 1299 10/30/2026 Total MULDER, JONATHAN: 89.44 89.44 NAPA AUTO PARTS 30900 476594 WINDSHIELD WASH 10/12/2026 5.14 5.14 1269 10/12/2026 476594 WINDSHIELD WASH 10/12/2026 5.14 5.14 1269 10/12/2026 476660 #23 HYDRAULIC ADAPTER 10/12/2026 3.18 3.18 1269 10/12/2026 476660 #23 HYDRAULIC ADAPTER 10/12/2026 3.18 3.18 1269 10/12/2026 476660 #23 HYDRAULIC ADAPTER 10/12/2026 25.46 25.46 1269 10/12/2026 Total NAPA AUTO PARTS: 42.10 42.10 ODP BUSINESS SOLUTIONS LLC 38877 483412101001 COPY PAPER 10/12/2026 16.67 16.67 1270 10/12/2026 483412101001 COPY PAPER 10/12/2026 13.25 13.25 1270 10/12/2026 483412101001 COPY PAPER 10/12/2026 12.81 12.81 1270 10/12/2026 483412101001 TRASH BAGS 10/12/2026 17.69 17.69 1270 10/12/2026 483412101001 TRASH BAGS 10/12/2026 14.06 14.06 1270 10/12/2026 483412101001 TRASH BAGS 10/12/2026 13.61 13.61 1270 10/12/2026 483877429001 BILLING PLANNER 10/12/2026 7.17 7.17 1270 10/12/2026 483877429001 BILLING PLANNER 10/12/2026 5.70 5.70 1270 10/12/2026 483877429001 BILLING PLANNER 10/12/2026 5.52 5.52 1270 10/12/2026 483877516001 BILLING WALL CALENDAR 10/12/2026 7.17 7.17 1270 10/12/2026 483877516001 BILLING WALL CALENDAR 10/12/2026 5.70 5.70 1270 10/12/2026 483877516001 BILLING WALL CALENDAR 10/12/2026 5.52 5.52 1270 10/12/2026 483877516002 PAPER USED FOR WATER DOOR HANGERS 10/12/2026 13.96 13.96 1270 10/12/2026 484337297001 WALL CALENDAR- ACCOUNTING 10/12/2026 7.17 7.17 1270 10/12/2026 484337297001 WALL CALENDAR- ACCOUNTING 10/12/2026 5.70 5.70 1270 10/12/2026 484337297001 WALL CALENDAR- ACCOUNTING 10/12/2026 5.52 5.52 1270 10/12/2026 484337297001 WWTP OFFICE SUPPLIES 10/12/2026 64.46 64.46 1270 10/12/2026 484548215001 WWTP OFFICE SUPPLIES 10/30/2026 83.22 83.22 1300 10/30/2026 Total ODP BUSINESS SOLUTIONS LLC: 304.90 304.90 ONLINE INFORMATION SERVICES 38940 1416576 ONLINE UTILITY EXCHANGE-E 10/12/2026 9.81 9.81 1101220210/12/2026 1416576 ONLINE UTILITY EXCHANGE-W 10/12/2026 7.80 7.80 1101220210/12/2026 1416576 ONLINE UTILITY EXCHANGE-S 10/12/2026 7.55 7.55 1101220210/12/2026 Total ONLINE INFORMATION SERVICES: 25.16 25.16 PARAGON DEVELOPMENT SYSTEMS 40250 15357911 LAPTOP FINANCE DIRECTOR 10/12/2026 832.26 832.26 1271 10/12/2026 15357911 LAPTOP FINANCE DIRECTOR 10/12/2026 661.54 661.54 1271 10/12/2026 15357911 LAPTOP FINANCE DIRECTOR 10/12/2026 640.20 640.20 1271 10/12/2026 15358267 3 YEAR CAREPACK FINANCE DIRECTOR COMPUTER 10/12/2026 65.91 65.91 1271 10/12/2026 WAUPUN UTILITIES Paid Invoice Report - COMMISSION Page: 7 Check issue dates: 10/1/2026 - 10/31/2026 Nov 03, 2026 01:33PM Vendor Invoice Invoice Invoice Check Check Check Number Number Description Date Amount Amount Number Issue Date 15358267 3 YEAR CAREPACK FINANCE DIRECTOR COMPUTER 10/12/2026 52.39 52.39 1271 10/12/2026 15358267 3 YEAR CAREPACK FINANCE DIRECTOR COMPUTER 10/12/2026 50.70 50.70 1271 10/12/2026 Total PARAGON DEVELOPMENT SYSTEMS: 2,303.00 2,303.00 PAYMENT SERVICE NETWORK 40285 330467 RT17076-CREDIT CARD FEES-E 65% 10/12/2026 614.58 614.58 1101220210/12/2026 330467 RT17076-CREDIT CARD FEES-W 18% 10/12/2026 170.19 170.19 1101220210/12/2026 330467 RT17076-CREDIT CARD FEES-S 17% 10/12/2026 160.73 160.73 1101220210/12/2026 331059 RT28446-CREDIT CARD FEES-E 38% 10/12/2026 1.43 1.43 1101220210/12/2026 331059 RT28446-CREDIT CARD FEES-W 25% 10/12/2026 .94 .94 1101220210/12/2026 331059 RT28446-CREDIT CARD FEES-S 37% 10/12/2026 1.38 1.38 1101220210/12/2026 Total PAYMENT SERVICE NETWORK: 949.25 949.25 PIGGLY WIGGLY 41200 $6 CREDIT CREDIT FOR MEETING SUPPLIES 10/12/2026 2.00- 2.00- 51403 10/12/2026 $6 CREDIT CREDIT FOR MEETING SUPPLIES 10/12/2026 2.00- 2.00- 51403 10/12/2026 $6 CREDIT CREDIT FOR MEETING SUPPLIES 10/12/2026 2.00- 2.00- 51403 10/12/2026 3265 SAFETY TRAINING 10/12/2026 5.85 5.85 51403 10/12/2026 3265 SAFETY TRAINING 10/12/2026 4.65 4.65 51403 10/12/2026 3265 SAFETY TRAINING 10/12/2026 4.50 4.50 51403 10/12/2026 5060 WWTP LAB SHIPPING SUPPLIES 10/30/2026 25.61 25.61 51420 10/30/2026 Total PIGGLY WIGGLY: 34.61 34.61 PUBLIC SERVICE COMMISSION OF W 44200 RA27-I-06290 PSC REMAINDER ASSMT - GROSS INTRASTATE OPERATI10/12/2026 13,007.21 13,007.21 1272 10/12/2026 RA27-I-06290PSC REMAINDER ASSMNT GROSS INTRASTATE OPERAT10/12/2026 2,913.00 2,913.00 1272 10/12/2026 Total PUBLIC SERVICE COMMISSION OF W: 15,920.21 15,920.21 RESCO 46400 3127895 FIBERGLASS CROSSARM (30) 10/12/2026 6,420.00 6,420.00 1273 10/12/2026 3130638 150KVA 3 PH PAD MOUNT TRANSFORMERS (2) 10/30/2026 32,436.00 32,436.00 1301 10/30/2026 3131369 BRANDNER SAFETY CLOTHES 10/12/2026 769.73 769.73 1273 10/12/2026 Total RESCO: 39,625.73 39,625.73 RUEKERT-MIELKE 49300 166101 ABNR SCADA SERVICE WORK 8/7/26-9/4/26 10/12/2026 678.00 678.00 1274 10/12/2026 166441 WATER PLANT RADIO IMPROVEMENT PLC CONFIG. 10/30/2026 535.47 535.47 1302 10/30/2026 166442SCADA RADIO REPLACEMENT DESIGN/INSTALL ASSISTA10/30/2026 2,930.33 2,930.33 1302 10/30/2026 166442SCADA RADIO REPLACEMENT DESIGN/INSTALL ASSISTA10/30/2026 6,837.44 6,837.44 1302 10/30/2026 166443 ABNR SCADA SERVICE WORK 9/5/26-10/2/26 10/30/2026 226.00 226.00 1302 10/30/2026 Total RUEKERT-MIELKE: 11,207.24 11,207.24 SABEL MECHANICAL LLC 50300 261122 SLUDGE HAULED (71 LOADS) 10/30/2026 31,749.14 31,749.14 1303 10/30/2026 Total SABEL MECHANICAL LLC: 31,749.14 31,749.14 SEERA 51535WAUPUN/SEPTEM"WAUPUN" FOCUS PROGRAM FEE 10/12/2026 2,898.62 2,898.62 1275 10/12/2026 WAUPUN UTILITIES Paid Invoice Report - COMMISSION Page: 8 Check issue dates: 10/1/2026 - 10/31/2026 Nov 03, 2026 01:33PM Vendor Invoice Invoice Invoice Check Check Check Number Number Description Date Amount Amount Number Issue Date Total SEERA: 2,898.62 2,898.62 CHARTER COMMUNICATIONS 52500 171156801100726 INTERNET SERVICES-E 10/30/2026 112.54 112.54 1285 10/30/2026 171156801100726 INTERNET SERVICES-W 10/30/2026 89.45 89.45 1285 10/30/2026 171156801100726 INTERNET SERVICES-S 10/30/2026 86.57 86.57 1285 10/30/2026 171156801100726 MONTHLY SERVICE EXP -E 10/30/2026 107.64 107.64 1285 10/30/2026 171156801100726 MONTHLY SERVICE EXP-W 10/30/2026 85.56 85.56 1285 10/30/2026 171156801100726 MONTHLY SERVICE EXP-S 10/30/2026 82.81 82.81 1285 10/30/2026 171156801100726 WATER PLANT VOICE SERV 10/30/2026 95.13 95.13 1285 10/30/2026 171156801100726 WASTEWATER VOICE SERV 10/30/2026 95.13 95.13 1285 10/30/2026 Total CHARTER COMMUNICATIONS: 754.83 754.83 SPEE-DEE 52600 1553454 SERVICE CHRG FOR WATER SAMPLES 10/12/2026 58.08 58.08 51405 10/12/2026 1565231 SERVICE CHRG FOR WATER SAMPLES 10/30/2026 72.18 72.18 51421 10/30/2026 Total SPEE-DEE: 130.26 130.26 TERMINATOR PEST CONTROL 55950 272166 PEST CONTROL AT WATER PLANT 10/12/2026 138.00 138.00 51406 10/12/2026 Total TERMINATOR PEST CONTROL: 138.00 138.00 TJ'S AUTO BODY 57200 WO 225-210 VEHICLE REPAIR DURING CONSTRUCTION 10/30/2026 2,800.80 2,800.80 51422 10/30/2026 Total TJ'S AUTO BODY: 2,800.80 2,800.80 TRUCLEANERS LLC 58700 WU100126 MONTHLY CLEANING SERVICE - E 10/12/2026 409.50 409.50 1276 10/12/2026 WU100126 MONTHLY CLEANING SERVICE - W 10/12/2026 325.50 325.50 1276 10/12/2026 WU100126 MONTHLY CLEANING SERVICE - S 10/12/2026 315.00 315.00 1276 10/12/2026 Total TRUCLEANERS LLC: 1,050.00 1,050.00 TRUE NORTH CONTROLS 58730 3690 RADIO RPLCMNT FOR WTR - 4 WELLS, 2 TWRS, 1 SPARE 10/12/2026 21,486.50 21,486.50 51407 10/12/2026 3690 RADIO RPLCMNT FOR SWR - 3 LIFT STATIONS 10/12/2026 9,208.50 9,208.50 51407 10/12/2026 3702 WTF RADIO UPGRADE SUPPLIES & EQUIPMENT 10/12/2026 8,574.00 8,574.00 51407 10/12/2026 Total TRUE NORTH CONTROLS: 39,269.00 39,269.00 USA BLUE BOOK 59600 INV01156437 WATER PLANT LAB SUPPLIES 10/12/2026 785.54 785.54 1277 10/12/2026 Total USA BLUE BOOK: 785.54 785.54 VAN BUREN, JEROME and/or SANDRA 60800SEPTEMBER 2026 SOLAR CREDIT - 9/26 10/12/2026 308.33 308.33 51408 10/12/2026 Total VAN BUREN, JEROME and/or SANDRA: 308.33 308.33 VERONA SAFETY SUPPLY INC 63200 140223 EARPLUGS 10/12/2026 54.49 54.49 1278 10/12/2026 WAUPUN UTILITIES Paid Invoice Report - COMMISSION Page: 9 Check issue dates: 10/1/2026 - 10/31/2026 Nov 03, 2026 01:33PM Vendor Invoice Invoice Invoice Check Check Check Number Number Description Date Amount Amount Number Issue Date 140223 EARPLUGS 10/12/2026 54.50 54.50 1278 10/12/2026 Total VERONA SAFETY SUPPLY INC: 108.99 108.99 VIKING ELECTRIC SUPPLY 63300 S010635164.001MINOR INVENTORY (PVC, LOCKNUTS, ADAPTERS, COUP10/12/2026 164.00 164.00 51409 10/12/2026 S010635164.001 SWEEP ELBOW (6) 10/12/2026 333.90 333.90 51409 10/12/2026 S010635164.001 4" SCH40 PVC PIPE (200') 10/12/2026 692.48 692.48 51409 10/12/2026 S010635164.002 PVC ELBOW (4) - MADISON/MILL ALLEYWAY (2) 10/12/2026 151.17 151.17 51409 10/12/2026 S010635164.003 EXPANSION COUPLINGS (2) - MADISON/MILL ALLEYWAY 10/12/2026 174.59 174.59 51409 10/12/2026 S010740585.001 UNI-STRUT (20) 10/30/2026 87.10 87.10 51423 10/30/2026 S010740585.001 #12 WIRE (3,500) 10/30/2026 1,009.37 1,009.37 51423 10/30/2026 s010740585.002 #12 WIRE (500) 10/30/2026 144.20 144.20 51423 10/30/2026 Total VIKING ELECTRIC SUPPLY: 2,756.81 2,756.81 VIRGINIA TRANSFORMER CORP 63600 100436 TRANSFORMER FOR BUSINESS PARK - 12/22.4 MVA, 6--1 10/12/2026 301,560.00 301,560.00 51410 10/12/2026 Total VIRGINIA TRANSFORMER CORP: 301,560.00 301,560.00 WAUPUN, CITY OF 74400 1808 EMPLOYEE CLINIC-E (38%) 10/12/2026 857.99 857.99 1279 10/12/2026 1808 EMPLOYEE CLINIC-W (25%) 10/12/2026 564.47 564.47 1279 10/12/2026 1808 EMPLOYEE CLINIC-S (37%) 10/12/2026 835.41 835.41 1279 10/12/2026 1810 2025 SINGLE AUDIT 10/30/2026 8,396.85 8,396.85 1304 10/30/2026 1826 MSA CONSTRUCTION STAKING & OBSERVATIONS 10/30/2026 29,319.85 29,319.85 1304 10/30/2026 1826 MSA CONSTRUCTION STAKING & OBSERVATIONS 10/30/2026 11,871.01 11,871.01 1304 10/30/2026 PILOT OCTOBER 2 2026 PILOT - WATER 10/12/2026 26,433.00 26,433.00 1279 10/12/2026 PILOT OCTOBER 2 2026 PILOT - ELECTRIC 10/12/2026 21,471.00 21,471.00 1279 10/12/2026 SENIOR EXPO 10.2 ANNUAL MEMBERSHIP - SANDY DEBOER & SHIRLEY HA10/30/2026 260.00 260.00 1304 10/30/2026 STORMWATER SESTORMWATER RECEIPTS 10/12/2026 51,320.06 51,320.06 1279 10/12/2026 TRASH SEPTEMBETRASH/RECYCLING COLLECTION 10/12/2026 50,256.64 50,256.64 1279 10/12/2026 Total WAUPUN, CITY OF: 201,586.28 201,586.28 WEX BANK 79930 115535855 FUEL VEHICLE EXPENSE - E 10/12/2026 2,419.31 2,419.31 1101220310/12/2026 115535855 FUEL VEHICLE EXPENSE - W 10/12/2026 1,127.86 1,127.86 1101220310/12/2026 115535855 FUEL VEHICLE EXPENSE - S 10/12/2026 2,063.69 2,063.69 1101220310/12/2026 Total WEX BANK: 5,610.86 5,610.86 WISCONSIN CORRECTIONAL CENTER 84300 410-0000011879 INMATE LABOR SEPTEMBER 2026 10/12/2026 125.00 125.00 51411 10/12/2026 410-0000011911 INMATE LABOR SEPTEMBER 2026 10/12/2026 159.00 159.00 51411 10/12/2026 Total WISCONSIN CORRECTIONAL CENTER: 284.00 284.00 WISCONSIN DEPT OF REVENUE 858002026 GROSS REVE 2026 GROSS REVENUE LICENSE FEE - 2ND INSTALLMEN10/12/2026 4,931.56 4,931.56 1101220310/12/2026 Total WISCONSIN DEPT OF REVENUE: 4,931.56 4,931.56 WISCONSIN PUBLIC SERVICE CORPORATION 87000TRANSFORMER 20 KUHLMAN 13/17/22 MVA USED SUBSTATION ELECTRIC T 10/30/2026 20,866.11 20,866.11 1305 10/30/2026 WAUPUN UTILITIES Paid Invoice Report - COMMISSION Page: 10 Check issue dates: 10/1/2026 - 10/31/2026 Nov 03, 2026 01:33PM Vendor Invoice Invoice Invoice Check Check Check Number Number Description Date Amount Amount Number Issue Date Total WISCONSIN PUBLIC SERVICE CORPORATION: 20,866.11 20,866.11 WISCONSIN STATE LAB OF HYGIENE 88300 30052776 LAB TESTING/ACCREDITATION 10/30/2026 1,688.00 1,688.00 51426 10/30/2026 30053733 FLUORIDE LAB TESTING - WTF 10/30/2026 33.00 33.00 51426 10/30/2026 Total WISCONSIN STATE LAB OF HYGIENE: 1,721.00 1,721.00 WPPI ENERGY 89600 27-92026 METER DATA COLLECTION - E 10/30/2026 1,032.43 1,032.43 1030202610/30/2026 27-92026 METER DATA COLLECTION - W 10/30/2026 820.65 820.65 1030202610/30/2026 27-92026 METER DATA COLLECTION - S 10/30/2026 794.17 794.17 1030202610/30/2026 27-92026 HOSTED BILLING CIS-E 10/30/2026 792.70 792.70 1030202610/30/2026 27-92026 HOSTED BILLING CIS-W 10/30/2026 630.10 630.10 1030202610/30/2026 27-92026 HOSTED BILLING CIS-S 10/30/2026 609.76 609.76 1030202610/30/2026 27-92026 GIS SUPPORT -E 10/30/2026 1,191.67 1,191.67 1030202610/30/2026 27-92026 SHARED METER TECH SERVICE-E 10/30/2026 214.38 214.38 1030202610/30/2026 27-92026 SHARED METER TECH SERVICE-W 10/30/2026 214.37 214.37 1030202610/30/2026 27-92026 CYBER SECURITY-E 10/30/2026 236.13 236.13 1030202610/30/2026 27-92026 CYBER SECURITY-W 10/30/2026 193.20 193.20 1030202610/30/2026 27-92026 CYBER SECURITY-S 10/30/2026 286.22 286.22 1030202610/30/2026 27-92026 MEMEBER NETWORK ASSESMT & MONITOR-E 10/30/2026 36.73 36.73 1030202610/30/2026 27-92026 MEMEBER NETWORK ASSESMT & MONITOR-W 10/30/2026 29.19 29.19 1030202610/30/2026 27-92026 MEMEBER NETWORK ASSESMT & MONITOR-S 10/30/2026 28.25 28.25 1030202610/30/2026 27-92026 IT TICKETS -E 10/30/2026 297.77 297.77 1030202610/30/2026 27-92026 IT TICKETS -W 10/30/2026 236.69 236.69 1030202610/30/2026 27-92026 IT TICKETS -S 10/30/2026 229.05 229.05 1030202610/30/2026 27-92026 WPPI WAN-E 10/30/2026 64.35 64.35 1030202610/30/2026 27-92026 WPPI WAN-W 10/30/2026 51.15 51.15 1030202610/30/2026 27-92026 WPPI WAN-S 10/30/2026 49.50 49.50 1030202610/30/2026 27-92026 T-MOBILE - E 10/30/2026 5.00 5.00 1030202610/30/2026 27-92026 T-MOBILE - W 10/30/2026 5.00 5.00 1030202610/30/2026 27-92026 USP OIL SAMPLE SHIPPIN CHARGE 10/30/2026 74.74 74.74 1030202610/30/2026 27-92026 POWER PARTNER REWARDS REBATE 10/30/2026 175.00- 175.00- 1030202610/30/2026 27-92026 WHOLE SALE POWER BILL 10/30/2026 918,367.62 918,367.62 1030202610/30/2026 27-92026 JUD-SONS (1 OF 60) 10/30/2026 149.20 149.20 1030202610/30/2026 Total WPPI ENERGY: 926,465.02 926,465.02 WAUPUN UTILITIES (Refund Acct) 100000 15014017-025 REF OVERPAYMT FRM: 725 W LINCOLN ST APT 4 10/30/2026 34.19 34.19 51425 10/30/2026 18061220-033 REF OVERPAYMT FRM: 235 TAYLOR ST 10/30/2026 105.07 105.07 51424 10/30/2026 Total WAUPUN UTILITIES (Refund Acct): 139.26 139.26 Grand Totals: 1,816,488.64 1,816,488.64 Page: 1ACH and TRANSFER PAYMENTSWAUPUN UTILITIES Period 10/26 (10/31/2026) Nov 03, 2026 1:23PM Date Reference Number Payee or Description Account Number Account Title Debit Amount Credit Amount CASH DISBURSEMENTS (CD) 1 10/16/2026 1 Record August Sales & Use Tax 1-2241-2416-00 TAX COLL PAY - SALES TAX 16,262.47 Record August Sales & Use Tax 9-1131-0000-00 COMBINED CASH .00 16,262.47- 16,262.47-16,262.47Total 1: CASH DISBURSEMENTS (CD) 2 10/10/2026 2 Record ACH Credit Card Paymt 1-2232-0000-00 ACCOUNTS PAYABLE - ELECTRI .00 55.86- Record ACH Credit Card Paymt 2-2232-0000-00 ACCOUNTS PAYABLE - WATER 102.70 Record ACH Credit Card Paymt 3-2232-0000-00 ACCOUNTS PAYABLE - WASTEW 1,415.91 Record ACH Credit Card Paymt 9-1131-0000-00 COMBINED CASH .00 1,462.75- 1,518.61-1,518.61Total 2: CASH DISBURSEMENTS (CD) 3 10/13/2026 3 Record WF Monthly Fees 1-5921-0000-20 OFFICE SUPPLIES AND EXPENS 28.91 Record WF Monthly Fees 2-5921-0000-20 OFFICE SUPPLIES & EXPENSES 8.00 Record WF Monthly Fees 3-5851-0000-20 OFFICE SUPPLIES & EXPENSES 7.56 Record WF Monthly Fees 9-1131-0000-00 COMBINED CASH .00 44.47- 44.47-44.47Total 3: 17,825.55-17,825.55Total CASH DISBURSEMENTS (CD): References: 3 Transactions: 10 17,825.55-17,825.55Grand Totals: Page 1 of 3 TO: Waupun Utilities Commissioners FROM: Jeff Stanek, CPA, Finance Director DATE: November 9, 2026 SUBJECT: September 2026 Financial Report CONSTRUCTION AND PLANT ADDITIONS The electric utility construction activity consisted of continued work on the alleyway reconstruction project, overhead re-builds and miscellaneous customer work. Engineering work continues with the Business Park substation project. The Water/Sewer utilities continued work associated with the Alleyway reconstruction projects. The electric utility purchased two utility-body trucks during the month totaling $140,700 to replace several service vehicles past their useful lives. MONTHLY OPERATING RESULTS – September 2026 Monthly and Year-To-Date (YTD) Sales Electric ➢ Monthly kWh sales were 13.6% above budget & 9.8% higher than September 2025 on increased sales to Residential, Large and Industrial Power customers. ➢ YTD kWh sales were 8.1% above budget & 10.1% higher than September 2025 YTD actual sales. Water ➢ Monthly sales units of 100 cubic feet were 10.2% below budget & 1.5% higher than September 2025 sales on and increase in sales to Industrial customers. ➢ YTD water sales were 0.1% below budget & 2.3% higher than September 2025 YTD actual sales. Sewer ➢ Monthly sales units of 100 cubic feet were 1.2% above budget & 7.2% higher than September 2025 from higher volumes to Industrial & Public Authority customers. ➢ YTD sewer sales were 4.8% above budget & 5.6% higher than September 2025 YTD actual sales. Income Statement Electric ➢ Operating revenues and purchased power expense were above budget $1,076,600 and $961,800, respectively, due to increased consumption and higher market energy costs. ➢ Gross margin was $114,800 above budget as a result of the higher unit sales than budgeted. ➢ Operating expenses were $90,000 below budget primarily due to lower distribution expenses associated with tree trimming during the non-construction season, increased work order activity and mutual aid to other communities. ➢ Operating income was $604,600 or $293,600 above budget, largely due to higher operating revenue and lower expenses than originally budgeted. Page 2 of 3 ➢ Net income was $723,100 or $407,500 above budget primarily from increased operating revenues. ➢ The rolling 12-month Rate of Return was 9.1%. Water ➢ Operating revenues were above budget by $9,400 due to increases in revenues from Public Authority customers. ➢ Operating expenses were $28,300 above budget on higher distribution expenses associated with water main breaks during winter freezing periods and meter costs from repaired meters. ➢ Operating income was $426,100 or $14,000 below budget. ➢ Net income was $461,000 or $51,000 above budget. ➢ The rolling 12-month Rate of Return was 3.9%. Sewer ➢ Operating revenues were $71,900 above budget due to slight increases high strength charges to Public Authority customers. ➢ Operating expenses were $129,400 below budget due to fewer maintenance costs experienced during the month, primarily from lower drying costs from the ABNR process. ➢ Operating income (loss) was $99,800 or $174,200 above budget as a result of the increased revenues and lower operating expenses. ➢ Net income (loss) was ($54,500) or $210,600 above budget largely due to lower operating expenses. ➢ The rolling 12-month Rate of Return was 3.5%. Balance Sheets Electric ➢ Balance sheet increased $39,700 from August 2026 due to an increase in plant purchases associated with a down payment on a transformer for the new substation in the amount of $301,000 which will be reimbursed with debt proceeds in early 2027 and the purchase of $140,000 in new vehicles. Accounts receivable/payable were lower due to a change from high consumption & power-related costs typically experienced during the summer (high consumption) months. ➢ Unrestricted cash decreased $182,200 from routine operations and the capital purchases. ➢ Net Position increased $52,900. Water ➢ Balance sheet increased $48,100 from August 2026 due to an increase in plant through construction in progress associated with the alleyway reconstruction project. ➢ Unrestricted cash decreased $186,700 from routine operations and payments associated with the Madison/Mill Street alleyway reconstruction projects. ➢ Net Plant increased $247,300 from the Madison/ Mill Street Alleyway reconstruction project. ➢ Net Position increased $44,900. Sewer ➢ Balance sheet decreased $61,000 from August 2026 as a result of routine operations and plant purchases associated with the Madison/Mill Street alleyway reconstruction projects. ➢ Unrestricted cash increased $35,000 from routine operations. ➢ Net Position decreased $27,500 from routine operations and monthly depreciation expense being higher than operating margins. Page 3 of 3 Cash and Investments The monthly metrics dashboard for cash and investments provides a monthly comparison of cash and investment balances and graphs that present long-term investments by maturity, type, and rating. The Utility’s investments are typically fixed-income and held-to-maturity unless called before maturity by the issuer. Held to maturity investments recognize monthly mark to market adjustments that u ltimately are not realized when the investment matures. ➢ Total cash and investments decreased $408,200 or 2.8% from August 2026 primarily from routine operating activity and payment for capital-related purchases including the $301,000 substation transformer down payment. ➢ Received interest and distributions of $13,300 and recorded unrealized market adjustments of ($49,500) along with ($800) in management fees, resulting in a net portfolio loss of ($37,200) for the month. ➢ Total interest and investment income earned (excluding market value adjustments) on all accounts for the month was $33,500 and $341,000 year-to-date. OTHER FINANCIAL MATTERS 2027 Utility Budget Process See separate 2027 Budget Memo for summary analysis of the final budget. Outstanding Utility Bill - Tax Roll Process Utility bills past due as of September 30, 2026, were subject to a 10% interest penalty effective November 1, 2026. A total of 53 customer accounts received the penalty on their unpaid balances subject to placement on the tax roll, resulting in $1,596.04 in total penalties charged. Resolution to Call (Pay-off) 2019 Revenue Bonds A Resolution will be presented to the City of Waupun Common Council on November 10th to approve the early payment (debt call) of the remaining $2,015,000 in outstanding 2019 Revenue Bonds, effective as of the call date of March 1, 2027. The water utility has adequate cash funds on-hand to pay-off the existing debt. This transaction will eliminate historical Revenue Bond Official Statement language carried - forward from each successive debt issuance and will allow for more flexibility to participate in State and Federal loan programs in the future as needed. This concludes my report. Please do not hesitate to contact me at 324-7920 or jstanek@waupunutilities.org with any questions or comments. Waupun Utilities Construction and Plant Additions Summary September 2026 CONSTRUCTION: Total Description Month Project To Date Budget Month Project To Date Budget Month Project To Date Budget Project To Date Budget Projects: Overhead and underground conductor and devices 5,919 $         114,041$     ‐ $                 ‐ $                ‐ $                    ‐ $                   ‐ $             ‐ $             ‐ $                114,041$         ‐ $                  Transformers  ‐                ‐               75,000            ‐                  ‐                      ‐                      ‐               ‐               ‐                  ‐                   75,000             Overhead and Underground Services 1,278            12,916         10,000             ‐                  ‐                      ‐                      ‐               ‐               ‐                  12,916            10,000              LED street lighting ‐                17,337        10,000             ‐                  ‐                      ‐                      ‐               ‐               ‐                  17,337            10,000              Voltage conversion ‐                ‐               60,000            ‐                  ‐                      ‐                      ‐               ‐               ‐                  ‐                   60,000             Rebuild overhead and underground line 27,932          35,735         310,000           ‐                  ‐                      ‐                      ‐               ‐               ‐                  35,735            310,000            City of Waupun ‐ Shared Services ‐                ‐               ‐                   724                 ‐                      ‐                      436               436               ‐                  436                  ‐                     Work Invoiced to Customer / Others ‐ CIAC 1,744            18,639         ‐                   ‐                  ‐                      ‐                      ‐               283               ‐                  18,923            ‐                     Mutual Aid reimbursements ‐                71,202        ‐                   ‐                  ‐                      ‐                      ‐               ‐               ‐                  71,202            ‐                     Meters /  Meter Modules / Gatekeepers ‐                20,320        10,000             ‐                  ‐                      ‐                      1,307           12,481         8,000              32,801             18,000              Sewer CIPP & manhole lining ‐                ‐               ‐                   ‐                  ‐                      85,000               ‐               ‐               ‐                  ‐                   85,000             New Water Well ‐ #6 ‐                ‐               ‐                   ‐                  ‐                      ‐                      ‐               1,682           52,000            1,682               52,000              Mill / Madison Street Alleyway Reconstruction 19,577          112,897       ‐                   75,375           89,945               93,936                289,950       503,213       357,564          706,055           451,500            N Grove, Park, Franklin Street Reconstruction ‐                ‐               ‐                   ‐                  11,537              ‐                      ‐               11,553        Miscellaneous Work Orders ‐                2,003          ‐                  2,582             18,722              11,675               1,052          2,762          ‐                 23,487            11,675             TOTAL CONSTRUCTION 56,450$       405,091$     475,000$         78,681$         120,204$          190,611$           292,745$     532,410$     417,564$        1,034,615$     1,083,175$      CARRYOVER PROJECTS: Business Park Substation 20,264          245,483       1,334,700       ‐                  ‐                      ‐                      ‐               ‐               ‐                  245,483          1,334,700        Substation upgrades ‐                171,789      ‐                   ‐                  ‐                      ‐                      ‐               ‐               ‐                  171,789          ‐                     OH & URD Re‐Build Projects 10,673          43,893         ‐                   ‐                  ‐                      ‐                      ‐               ‐               ‐                  43,893            ‐                     WWTF Phosphorus Upgrade Engineering ‐                ‐               ‐                   ‐                  3,872,607        3,804,000           ‐               ‐               ‐                  3,872,607      3,804,000        WWTF Construction Upgrade ‐ ABNR ‐                ‐              ‐                  ‐                 33,489,719      33,704,000       ‐               ‐              ‐                 33,489,719    33,704,000     TOTAL CARRYOVER CONSTRUCTION 30,937$       461,165$     1,334,700$     ‐$                37,362,326$     37,508,000$     ‐ $             ‐$             ‐$                37,823,491$   38,842,700$   PLANT ADDITIONS: Total Description Current Month YTD Budget Current Month YTD Budget Current Month YTD Budget YTD Budget Vehicle Replacements (2 utililty‐body & 1 pick‐up) 140,727 $      182,507 $     171,500 $         ‐ $                11,415$            10,750 $             ‐ $             11,415$       10,750 $          205,336 $         193,000 $          Admin Building Structures & Equipment ‐                35,676        68,400             46,378            76,278               51,300 $             ‐               31,344        51,300            143,298           171,000            SCADA & Treatment Facility Upgrades ‐                ‐               ‐                   ‐                  ‐                      ‐                      ‐               ‐               58,000           ‐                   58,000             Lift Station Upgrades ‐                ‐               ‐                   ‐                  ‐                      30,000               ‐               ‐               ‐                  ‐                   30,000             WWTF Equipment Replacements ‐                ‐               ‐                   ‐                  24,663              72,000                ‐               ‐               ‐                  24,663            72,000              WWTF Nonpotable SystemReplacements ‐                ‐               ‐                   ‐                  ‐                      160,000             ‐               ‐               ‐                  ‐                   160,000           Other Equipment Upgrades & Replacements ‐                9,571          60,600            ‐                 ‐                     13,300               ‐              ‐              33,300           9,571              107,200           TOTAL PLANT ADDITIONS 140,727$      227,754 $     300,500$         46,378$         112,356$          337,350$           ‐$             42,759$       153,350$        382,869$         791,200$          Electric Sewer Water Sewer WaterElectric Page 1 of 11 Variance from Budget Variance from Budget Current Current YTD Current Current YTD KWh 10,292,485         13.6% 8.2% Power Costs 918,368 $           16.8% 13.4% Revenues 1,150,006$        18.4% 11.8% Gross Margin 231,638 $           24.9% 5.8% Variance from Budget Variance from Budget Current Current YTD Current Current YTD Cubic Ft (100) 18,248                ‐10.2% ‐0.1% Revenues 146,453 $           ‐5.8% ‐0.1% Variance from Budget Variance from Budget Current Current YTD Current Current YTD Cubic Ft (100) 37,517                1.2% 4.8% Revenues 313,816 $           1.6% 3.9% Sales and Revenues Dashboard ‐ Sept 2026  5,000,000  6,000,000  7,000,000  8,000,000  9,000,000  10,000,000  11,000,000  12,000,000  13,000,000 Sep‐25 Oct‐25 Nov‐25 Dec‐25 Jan‐26 Feb‐26 Mar‐26 Apr‐26 May‐26 Jun‐26 Jul ‐26 Aug‐26 Sep‐26 kWhs Sold Actual Budgeted  10,000  12,000  14,000  16,000  18,000  20,000  22,000  24,000 Sep‐25 Oct‐25 Nov‐25 Dec‐25 Jan‐26 Feb‐26 Mar‐26 Apr‐26 May‐26 Jun‐26 Jul ‐26 Aug‐26 Sep‐26 Water Cubic Feet (100's) Sold Actual Budgeted  20,000  25,000  30,000  35,000  40,000  45,000 Sep‐25 Oct‐25 Nov‐25 Dec‐25 Jan‐26 Feb‐26 Mar‐26 Apr‐26 May‐26 Jun‐26 Jul ‐26 Aug‐26 Sep‐26Sewer Cubic Feet (100's) Treated Actual Budgeted Sales by Customer Class Sept 2026  ‐  2,000,000  4,000,000  6,000,000  8,000,000  10,000,000  12,000,000  14,000,000  16,000,000  18,000,000  20,000,000  22,000,000  24,000,000  26,000,000  28,000,000 Residential Commerical Small Power Large Power Industrial Power Larg e Industrial YTD Electric Sales (kWh) Budget 2025 2024 2023  ‐  50,000  100,000  150,000  200,000 Residential Commercial Industrial Public Authority YTD Sewer Sales (Ccf) Budget 2025 2024 2023  ‐  20,000  40,000  60,000  80,000  100,000  120,000 Residential Multifamily Commercial Industrial Public Authority YTD Water Sales (Ccf) Budget 2025 2024 2023 Page 3 of 11 ELECTRIC Sept 2024 Sept 2025 Sept 2026 Sales of Electricity 10,523,750 $ 11,412,548 $ 12,960,201 $ Purchased Power 8,218,232 8,871,249 10,219,712 Gross Margin 2,305,518 2,541,299 2,740,489 21.9% 22.3% 21.1% Other Operating Revenues 140,470 128,581 138,091 Operating Expenses Distribution expense 334,533 405,483 421,647 Customer accounts expense 134,227 137,260 145,779 Advertising expense (2,054) 7,671 5,030 Administrative & general expense 474,851 534,459 496,297 Total operating expenses 941,557 1,084,873 1,068,753 Other Operating Expenses Depreciation expense 675,034 671,905 732,036 Taxes 322,452 296,318 394,708 Total other operating expenses 997,486 968,223 1,126,744 Operating Income 506,945 616,785 683,083 Other Income (Expense) Capital contributions 880,708 59,052 454,272 Interest expense (14,131) (6,356) (2,669) Amortization of debt-related costs (6,241) (6,013) (2,335) Other 203,043 179,607 462,016 Total other income (expense) 1,063,379 226,290 911,284 Net Income 1,570,324 $ 843,075 $ 1,594,367$ Regulatory Operating Income 598,248 734,621 753,725 Rate of Return 7.35 8.94 9.05 Authorized Rate of Return 5.00 6.30 6.30 Current Ratio 6.3 5.9 4.6 Months of Unrestricted Cash on Hand 5.7 5.6 5.4 Equity vs Debt 0.97 0.99 1.00 Asset Utilization 0.59 0.59 0.60 Combined E&W Debt Coverage 4.33 4.54 7.98 Minimum Required Coverage 1.25 1.25 1.25 Note 1 - Electric rates adjusted April 2024. Definitions Rate of Return - Return on investment in capital infrastructure. Should be near authorized rate of return. Current Ratio - measure of liquidity or ability to pay obligations. Should be > 1. Months of Unrestricted Cash on Hand - measure of reserves. Should be at least 2-3 months. Equity vs Debt - Percent of infrastucture financed by operations. 50% is a good benchmark. Asset Utilization - Illustrates the relative age of the system. Ratio of 1 indicates a system at full life expectancy. Debt Coverage - Earnings coverage of annual debt service. Must exceed 1.25 WAUPUN UTILITIES Income Statement and Financial Ratios Electric Utility For the 12 Months Ending: Page 4 of 11 Last 12 Months YTD 2026 YTD Budget Difference ELECTRIC Operating Revenues 12,960,201 $ 10,205,514 $ 9,128,909 $ 1,076,605 $ Purchased Power 10,219,712 8,116,773 7,155,001 961,772 Gross Margin 2,740,489 2,088,741 1,973,908 114,833 21.1% 20.5% 21.6% Other Operating Revenues 138,091 178,260 82,404 95,856 Operating Expenses Distribution expense 421,647 348,012 459,360 (111,348) Customer accounts expense 145,779 107,754 99,738 8,016 Advertising expense 5,030 12,889 630 12,259 Administrative & general expense 496,297 411,059 409,998 1,061 Total operating expenses 1,068,753 879,715 969,726 (90,012) -9.28% Other Operating Expenses Depreciation expense 732,036 527,379 527,382 (3) Taxes 394,708 255,346 248,274 7,072 Total other operating expenses 1,126,744 782,726 775,656 7,070 Operating Income 683,083 604,562 310,930 293,632 Other Income (Expense) Capital contributions 454,272 - - - Interest expense (2,669) (975) (2,196) 1,221 Amortization of debt-related costs (2,335) (847) (639) (208) Other 462,016 120,322 7,497 112,825 Total other income (expense) 911,284 118,501 4,662 113,839 Net Income 1,594,367 $ 723,062 $ 315,592 $ 407,470 $ Sept 2026 Aug 2026 July 2026 June 2026 May 2026 April 2026 March 2026 Feb 2026 Jan 2026 Dec 2025 Nov 2025 Oct 2025 Sept 2025 Operating Revenues 1,150,006$ 1,499,883 $ 1,379,730 $ 1,164,611 $ 1,027,198 $ 921,776 $ 962,424 $ 1,091,652 $ 1,008,235 $ 936,399 $ 874,356 $ 943,931 $ 1,046,804 $ Purchased Power 918,368 1,263,064 1,121,772 927,632 806,569 696,551 737,978 869,528 775,311 703,826 671,351 727,762 839,779 Gross Margin 231,638 236,818 257,957 236,979 220,629 225,225 224,446 222,124 232,924 232,573 203,006 216,169 207,025 20.1% 15.8% 18.7% 20.3% 21.5% 24.4% 23.3% 20.3% 23.1% 24.8% 23.2% 22.9% 19.8% Other Operating Revenues 10,843 9,776 19,843 9,993 11,568 9,919 9,910 9,436 86,972 (60,792) 9,729 10,895 10,927 Operating Expenses Distribution expense 37,894 46,484 27,814 25,495 24,051 30,386 41,486 55,430 58,972 9,446 30,199 33,990 36,199 Customer accounts expense 11,772 15,833 12,440 11,567 10,607 11,720 10,839 10,404 12,573 18,222 9,680 10,123 10,185 Advertising expense 6,863 625 1,336 2,803 (3,866) 1,126 1,965 1,787 250 (3,263) (7,718) 3,123 954 Administrative & general expense 33,946 51,776 41,741 32,852 48,383 22,542 61,798 51,345 66,251 20,020 25,479 39,739 31,852 Total operating expenses 90,475 114,717 83,331 72,717 79,174 65,774 116,088 118,966 138,046 44,424 57,639 86,975 79,190 Other Operating Expenses Depreciation expense 58,598 58,598 58,598 58,598 58,598 58,598 58,598 58,598 58,598 93,824 55,416 55,416 55,416 Taxes 38,359 26,783 25,373 24,921 25,067 30,646 26,777 27,219 30,200 72,183 23,993 43,186 24,031 Total other operating expenses 96,956 85,380 83,971 83,519 83,665 89,244 85,375 85,817 88,798 166,007 79,409 98,602 79,447 Operating Income 55,050 46,497 110,498 90,737 69,357 80,126 32,893 26,777 93,053 (38,651) 75,686 41,487 59,315 Other Income (Expense) Capital contributions - - - - - - - - - 454,272 - - - Interest expense - - - - - - (975) - - (565) (565) (565) (565) Amortization of debt-related costs - - - - - - (706) (70) (70) (496) (496) (496) (496) Other (1,948) 10,972 21,033 25,943 14,524 9,936 5,598 19,721 14,545 315,019 16,894 9,780 14,931 Total other income (expense) (1,948) 10,972 21,033 25,943 14,524 9,936 3,917 19,650 14,475 768,231 15,833 8,719 13,870 Net Income 53,102 $ 57,468 $ 131,531 $ 116,679 $ 83,881 $ 90,062 $ 36,810 $ 46,428 $ 107,527 $ 729,580 $ 91,519 $ 50,206 $ 73,185 $ WAUPUN UTILITIES Detailed Income Statement and YTD Budget Comparison Electric Utility For the Period Ended Sept, 30 2026 Page 5 of 11 WATER Sept 2024 Sept 2025 Sept 2026 Operating Revenues 2,719,511 $ 2,662,394 $ 2,686,742 $ Operating Expenses Source of supply expenses 4,150 2,419 4,706 Pumping expenses 87,877 89,569 97,212 Water treatment expenses 426,600 326,804 335,093 Transmission & distribution expenses 216,417 218,107 281,142 Customer accounts expenses 118,625 116,656 122,654 Administrative & general expense 388,847 367,693 376,009 Total operating expenses 1,242,517 1,121,247 1,216,816 Other Operating Expenses Depreciation expense 612,056 603,878 621,538 Taxes 335,606 325,132 404,664 Total other operating expenses 947,662 929,010 1,026,202 Operating Income 529,332 612,138 443,724 Other Income (Expense) Capital contributions from customers and municipal 1,189,564 10,900 111,511 Interest expense (76,331) (66,361) (55,047) Amortization of debt-related costs (14,410) (13,200) (2,997) Other 176,170 127,925 109,582 Total other income (expense) 1,274,994 59,263 163,049 Net Income 1,804,326 $ 671,401 $ 606,773 $ Regulatory Operating Income 617,935 618,955 514,949 Rate of Return 4.55 4.59 3.92 Authorized Rate of Return 6.50 6.50 6.50 Current Ratio 48.44 177.99 79.82 Months of Unrestricted Cash on Hand 23.92 29.02 26.82 Equity vs Debt 0.84 0.86 0.89 Asset Utilization 0.42 0.44 0.46 Note 1 - Water rates adjusted May 2012. Definitions Rate of Return - Return on investment in capital infrastructure. Should be near authorized rate of return. Current Ratio - measure of liquidity or ability to pay obligations. Should be > 1. Months of Unrestricted Cash on Hand - measure of reserves. Should be at least 2-3 months. Equity vs Debt - Percent of infrastucture financed by operations. 50% is a good benchmark. Asset Utilization - Illustrates the relative age of the system. Ratio of 1 indicates a system at full life expectancy. WAUPUN UTILITIES Income Statement and Financial Ratios Water Utility For the 12 Months Ending: Page 6 of 11 Last 12 Months YTD 2026 YTD Budget Difference WATER Operating Revenues 2,686,742 $ 2,030,767 $ 2,021,356 $ 9,411 $ Operating Expenses Source of supply expenses 4,706 2,966 432 2,534 Pumping expenses 97,212 75,085 66,861 8,224 Water treatment expenses 335,09 3 247,244 215,514 31,730 Transmission & distribution expenses 281,142 197,42 9 167,15 3 30,276 Customer accounts expenses 122,654 95,132 85,815 9,317 Administrative & general expense 376,009 283,67 9 337,480 (53,801 ) Total operating expenses 1,216,816 901,53 4 873,25 5 28,279 3.24% Other Operating Expenses Depreciation expense 621,538 443,01 9 470,151 (27,132 ) Taxes 404,664 260,16 3 237,89 7 22,266 Total other operating expenses 1,026,202 703,182 708,048 (4,866) Operating Income 443,724 426,051 440,053 (14,002) Other Income (Expense) Capital contributions 111,511 - - - Interest expense (55,047) (39,450) (39,447) (3) Amortization of debt-related costs (2,997) 226 1,935 (1,709) Other 109,582 74,221 7,497 66,724 Total other income (expense) 163,049 34,997 (30,015 ) 65,012 Net Income 606,773$ 461,04 7$ 410,03 8$ 51,009 $ Sept 2026 Aug 2026 July 2026 June 2026 May 2026 April 2026 March 2026 Feb 2026 Jan 2026 Dec 2025 Nov 2025 Oct 2025 Sept 2025 WATER Operating Revenues 221,44 3$ 231,904 $ 243,62 8$ 232,16 6$ 236,31 8$ 218,35 9$ 214,41 9$ 212,85 5$ 219,67 3$ 218,05 3$ 215,88 8$ 222,03 5$ 218,04 6$ Operating Expenses Source of supply expenses - - 114 - 2,557 - 182 112 - 1,740 - - - Pumping expenses 139 7,271 7,079 13,921 7,489 6,444 9,335 12,223 11,185 9,429 6,371 6,327 7,732 Water treatment expenses 34,159 36,351 31,057 24,883 24,771 25,158 21,369 28,795 20,701 39,398 23,716 24,735 35,546 Transmission & distribution expenses 16,212 22,069 13,898 13,973 47,259 17,863 20,663 24,144 21,349 42,516 15,283 25,914 20,268 Customer accounts expenses 10,199 14,441 10,580 10,338 9,090 10,149 9,597 9,316 11,421 10,056 8,780 8,686 8,875 Administrative & general expense 26,101 34,477 30,282 26,771 27,528 14,546 49,245 32,930 41,798 46,976 17,431 27,923 22,907 Total operating expenses 86,810 114,610 93,010 89,886 118,692 74,160 110,392 107,520 106,454 150,115 71,580 93,587 95,327 Other Operating Expenses Depreciation expense 49,224 49,224 49,224 49,224 49,224 49,224 49,224 49,224 49,224 84,739 46,890 46,890 46,890 Taxes 31,590 29,805 28,185 28,102 28,176 28,044 27,926 28,536 29,800 88,508 27,913 28,080 28,381 Total operating expenses 80,814 79,030 77,409 77,326 77,400 77,268 77,150 77,760 79,025 173,248 74,802 74,970 75,271 Operating Income 53,819 38,265 73,209 64,954 40,226 66,930 26,878 27,575 34,195 (105,310) 69,505 53,478 47,448 Other Income (Expense) Capital contributions - - - - - - - - - 111,511 - - - Interest expense (4,383) (4,383) (4,383) (4,383) (4,383) (4,383) (4,383) (4,383) (4,383) (5,199) (5,199) (5,199) (5,199) Amortization of debt-related costs 786 786 786 786 786 786 (4,921) 215 215 (1,074) (1,074) (1,074) (1,074) Other (5,346) 8,037 8,754 12,716 11,686 10,755 2,454 13,401 11,763 13,590 15,034 6,737 12,123 Total other income (expense) (8,944) 4,440 5,157 9,119 8,089 7,158 (6,850) 9,233 7,595 118,828 8,760 464 5,850 Net Income 44,875 $ 42,705 $ 78,366 $ 74,073 $ 48,315 $ 74,088 $ 20,027 $ 36,809 $ 41,790 $ 13,517 $ 78,266 $ 53,942 $ 53,297 $ WAUPUN UTILITIES Detailed Income Statement and YTD Budget Comparison Water Utility For the Period Ended Sept 30, 2026 Page 7 of 11 SEWER Sept 2024 Sept 2025 Sept 2026 Operating Revenues 3,400,657 $ 3,440,315 $ 3,914,184 $ Operating Expenses WWTP operation expenses 566,343 702,547 695,883 Laboratory expenses 113,290 105,756 108,202 Maintenance expenses 543,291 541,453 552,144 Customer accounts expenses 154,628 147,017 156,942 Administrative & general expenses 571,161 497,398 577,648 Total operating expenses 1,948,713 1,994,170 2,090,820 Other Operating Expenses Depreciation expense 936,657 1,623,194 1,410,095 Total other operating expenses 936,657 1,623,194 1,410,095 Operating Income 515,287 (177,050) 413,270 Other Income (Expense) Interest expense (307,363) (305,591) (290,854) Capital contributions 1,598,415 1,467,921 286,357 Other 196,103 152,800 100,614 Total other income (expense) 1,487,155 1,315,130 96,117 Net Income (loss) 2,002,443 $ 1,138,080 $ 509,387 $ Operating Income (excluding GASB 68 & 75) 541,220 (245,245) 433,662 Rate of Return 3.28 (1.89) 3.48 Current Ratio 9.07 9.21 16.39 Months of Unrestricted Cash on Hand 8.53 7.47 12.60 Equity vs Debt 0.46 0.48 0.48 Asset Utilization 0.54 0.57 0.58 Debt Coverage 1.82 1.78 2.14 Minimum Required Coverage 1.20 1.20 1.20 Note 1 - Sewer rates adjusted April 2025. Definitions Rate of Return - Return on investment in capital infrastructure. Current Ratio - measure of liquidity or ability to pay obligations. Should be > 1. Months of Unrestricted Cash on Hand - measure of reserves. Should be at least 2-3 months. Equity vs Debt - Percent of infrastucture financed by operations. 50% is a good benchmark. Asset Utilization - Illustrates the relative age of the system. Ratio of 1 indicates a system at full life expectancy. Debt Coverage - Earnings coverage of annual debt service. Must exceed 1.20 WAUPUN UTILITIES Income Statement and Financial Ratios Sewer Utility For the 12 Months Ending: Page 8 of 11 Last 12 Months YTD 2026 YTD Budget Difference SEWER Operating Revenues 3,914,184 $ 2,973,476 $ 2,901,563 $ 71,913 $ Operating Expenses WWTP operation expenses 695,883 524,150 563,682 (39,532) Laboratory expenses 108,202 79,577 85,203 (5,626) Maintenance expenses 552,144 373,772 452,025 (78,253) Customer accounts expenses 156,942 121,892 112,032 9,860 Administrative & general expenses 577,648 415,242 431,116 (15,874) Total operating expenses 2,090,820 1,514,633 1,644,058 (129,425) -7.87% Other Operating Expenses Depreciation expense 1,410,095 1,359,049 1,331,865 27,184 Total other operating expenses 1,410,095 1,359,049 1,331,865 27,184 Operating Income (Loss) 413,270 99,795 (74,360) 174,155 Non-operating Income (Expense) Interest Expense (290,854) (220,658) (220,662) 4 Capital contributions 286,357 994 - 994 Other 100,614 65,399 29,997 35,402 Total other income (expense) 96,117 (154,266) (190,665) 36,399 Net Income (Loss) 509,387 $ (54,471) $ (265,025)$ 210,554 $ Sept 2026 Aug 2026 July 2026 June 2026 May 2026 April 2026 March 2026 Feb 2026 Jan 2026 Dec 2025 Nov 2025 Oct 2025 Sept 2025 SEWER Operating Revenues 324,692 $ 339,762 $ 337,459 $ 334,256 $ 348,997 $ 338,946 $ 308,030 $ 319,975 $ 321,358 $ 310,709 $ 305,007 $ 324,991 $ 317,794 $ Operating Expenses WWTP operation expenses 35,068 63,485 76,572 53,815 66,174 54,151 42,378 66,129 66,377 82,257 43,632 45,844 71,614 Laboratory expenses 5,831 10,830 7,166 7,711 8,134 8,660 10,557 12,680 8,007 9,572 13,416 5,638 7,702 Maintenance expenses 71,677 (1,896) 44,180 75,396 61,182 41,577 23,901 29,721 28,036 63,889 36,593 77,891 29,638 Customer accounts expenses 13,351 17,352 13,687 13,296 12,235 13,828 12,323 11,958 13,860 12,070 11,304 11,675 11,714 Administrative & general expense 42,095 49,709 41,742 39,614 48,297 32,336 60,927 45,945 54,577 72,737 31,227 58,441 51,495 Total operating expenses 168,022 139,481 183,347 189,833 196,021 150,552 150,086 166,433 170,857 240,526 136,172 199,489 172,164 Other Operating Expenses Depreciation expense 151,005 151,005 151,005 151,005 151,005 151,005 151,005 151,005 151,005 (247,197) 149,122 149,122 149,122 Total other operating expenses 151,005 151,005 151,005 151,005 151,005 151,005 151,005 151,005 151,005 (247,197) 149,122 149,122 149,122 Operating Income (Loss) 5,665 49,276 3,107 (6,582) 1,970 37,388 6,938 2,536 (505) 317,380 19,714 (23,619) (3,491) Other Income (Expense) Interest expense (24,518) (24,518) (24,518) (24,518) (24,518) (24,518) (24,518) (24,518) (24,518) (19,141) (25,528) (25,528) (25,528) Capital contributions - - - - - - 994 - - 285,363 - - - Other (8,681) 7,216 7,479 12,633 11,330 10,302 332 13,400 11,388 13,474 15,226 6,515 13,771 Total other income (expense) (33,198) (17,301) (17,039) (11,885) (13,188) (14,216) (23,192) (11,118) (13,130) 279,696 (10,301) (19,012) (11,756) Net Income (Loss) (27,533) $ 31,975 $ (13,931)$ (18,467) $ (11,217) $ 23,173 $ (16,253) $ (8,582) $ (13,635)$ 597,076 $ 9,412 $ (42,631)$ (15,248) $ WAUPUN UTILITIES Detailed Income Statement and YTD Budget Comparison Sewer Utility For the Period Ended Sept 30, 2026 Page 9 of 11 ELECTRIC Sept 2024 Sept 2025 Sept 2026 Aug 2026 Change Cash and investments - unrestricted 4,500,852 $ 4,774,042 $ 5,284,262 $ 5,466,428 $ (182,165) $ Cash and investments - restricted 154,170 161,461 0 0 - Receivables 1,163,226 1,284,826 1,444,114 1,704,009 (259,895) Materials and supplies 448,736 450,401 461,775 448,830 12,945 Other assets 81,472 81,801 80,412 103,746 (23,334) Plant - net of accumulated depreciation 9,697,287 10,135,215 10,991,640 10,499,473 492,168 Deferred outflows of resources 803,475 559,453 384,433 384,433 - Total Assets 16,849,219 17,447,200 18,646,637 18,606,918 39,718 Accounts payable 890,850 1,029,191 1,475,847 1,493,889 (18,042) Payable to sewer utility - - - - - Interest accrued 2,525 256 - - - Accrued benefits 92,342 100,981 113,420 110,797 2,623 Deferred inflows of resources 1,535,696 1,331,463 672,693 670,446 2,247 Long-term debt 380,000 195,000 - - - Net Position 13,947,806 14,790,308 16,384,675 16,331,786 52,889 Total Liabilities & Net Position 16,849,219$ 17,447,200$ 18,646,637$ 18,606,918$ 39,718 $ WATER Sept 2024 Sept 2025 Sept 2026 Aug 2026 Change Cash and investments - unrestricted / designated 3,146,027$ 3,498,044 $ 3,623,508 $ 3,810,218 $ (186,711) $ Cash and investments - restricted 452,859 467,883 376,599 377,283 (684) Receivables 256,006 241,647 245,044 250,514 (5,471) Materials and supplies 85,637 107,269 107,946 108,412 (466) Other assets 64,906 65,790 112,557 118,417 (5,860) Plant - net of accumulated depreciation 16,396,405 16,127,035 16,185,701 15,938,399 247,302 Deferred outflows of resources 451,080 328,826 247,748 247,748 - Total Assets 20,852,920 20,836,494 20,899,102 20,850,992 48,110 Accounts payable 65,052 16,604 41,611 43,790 (2,179) Interest accrued 5,187 4,407 6,854 2,471 4,383 Accrued benefits 60,900 67,418 56,056 54,239 1,817 Deferred inflows of resources 642,808 467,691 392,435 393,221 (786) Long-term debt 2,970,000 2,500,000 2,015,000 2,015,000 - Net Position 17,108,973 17,780,374 18,387,147 18,342,271 44,875 Total Liabilities & Net Position 20,852,920$ 20,836,494$ 20,899,102$ 20,850,992$ 48,110 $ SEWER Sept 2024 Sept 2025 Sept 2026 Aug 2026 Change Cash and investments - unrestricted 1,385,239 $ 1,242,053 $ 2,195,303 $ 2,160,317 $ 34,985 $ Cash and investments - restricted 2,617,243 2,815,229 2,506,019 2,579,618 (73,598) Receivables 277,697 357,829 371,926 359,861 12,065 Receivable from electric utility - - - - - Materials and supplies 8,529 8,581 8,173 8,313 (140) Advances to other funds - - - - - Other assets 52,692 40,646 61,818 69,565 (7,747) Plant - net of accumulated depreciation 49,300,603 49,652,251 48,876,807 48,903,398 (26,590) Deferred outflows of resources 729,543 501,909 383,452 383,452 - Total Assets 54,371,545 54,618,498 54,403,498 54,464,524 (61,026) Accounts payable 56,095 45,424 35,197 95,982 (60,785) Interest accrued 127,156 128,248 121,436 96,919 24,518 Accrued benefits 92,124 102,305 95,723 92,948 2,775 Deferred inflows of resources 853,190 557,361 459,296 459,296 - Long-term debt 26,533,400 25,937,500 25,334,800 25,334,800 - Net Position 26,709,579 27,847,659 28,357,046 28,384,579 (27,533) Total Liabilities & Net Position 54,371,545$ 54,618,498$ 54,403,498$ 54,464,524$ (61,026) $ WAUPUN UTILITES Balance Sheets Electric, Water, and Sewer Page 10 of 11 Monthly Dashboard - Cash & Investments September 2026 Account Restrictions Sept 2026 Aug 2026 $ Inc/(Dec) % Inc/(Dec) Checking ‐ E Unrestricted 674,079 $         854,297 $        (180,217) $       ‐21.10% Checking ‐ W Unrestricted 287,286            469,334           (182,048)          ‐38.79% Checking ‐ S Unrestricted 1,029,060         1,058,992        (29,932)            ‐2.83% Reserves ‐ E Unrestricted 4,176,802         4,180,098        (3,296)               ‐0.08% Reserves ‐ W Unrestricted 2,736,196         2,742,700        (6,504)               ‐0.24% Reserves ‐ S Unrestricted 1,166,243         1,101,325        64,918              5.89% P&I Redemption ‐ E Restricted 0                        0                        ‐                    0.00% P&I Redemption ‐ W Restricted 194,986            194,377           609                   0.31% P&I Redemption ‐ S Restricted 231,854            300,685           (68,832)            ‐22.89% Bond Reserve ‐ S Restricted 568,191            564,682           3,509                0.62% Construction ‐ S Restricted 0                        0                        ‐                    0.00% Depreciation ‐ E Restricted ‐                     ‐                    ‐                    #DIV/0! Depreciation ‐ W Restricted 181,613            182,906           (1,293)               ‐0.71% Capital Improve. ‐ E Designated 433,381            432,033           1,348                0.31% Capital Improve. ‐ W Designated 103,571           103,253           318                   0.31% ERF ‐ Water Plant Designated 496,454            494,931           1,523                0.31% ERF ‐ WWTP Restricted 1,705,975         1,714,251        (8,275)               ‐0.48% 13,985,691$   14,393,863 $   (408,173) $       ‐2.84% Unrestricted and Designated 11,103,072$   11,436,963 $  (333,891)$      ‐2.92% Restricted 2,882,618$      2,956,900 $    (74,282)$        ‐2.51%  $‐  $500,000  $1,000,000  $1,500,000  $2,000,000 Cash <12 mos. 13‐24 mos. 25‐36 mos. 37‐48 mos. 49‐60 mos. >60 mos. Long‐Term Investment by Maturity  22% 11% 48% 9% 5% 5%Long‐Term Investments by Type Cash/Money Markets Certificate of Deposits Muni Bonds US Government Government Agencies Corporate Bonds Page 11 of 11 Page 1 of 3 TO: Waupun Utilities Commission FROM: Jeff Stanek, CPA, Finance Director DATE: November 9, 2026 SUBJECT: 2027 Budget Review This memorandum provides an introduction to the proposed Waupun Utilities 2027 budget. Waupun Utilities 2027 Budget Summary Electric Water Sewer Total Sources of Cash Operating Revenues 13,407,415 $ 2,685,767 $ 4,385,134 $ 20, 478,316$ Debt Financing 7,000,000 - - 7, 000,000 Equipment Replacement Funds 85,000 - - 85,000 Interest Earnings 40,000 5 0 , 0 0 0 40,000 130,000 Total Sources of Cash 20,532,415 2,735,767 4,425,134 27,693,316 Uses of Cash Operation and Maintenance Expenses 11,921,299 1,354,298 2, 344,900 15, 620,497 Depreciation on Meters - - 32,500 32,500 Taxes 405,949 391,816 - 797,765 Debt Service 2019 Refunding Revenue Bonds - 2,015,000 - 2, 015,000 2020/21 USDA Revenue Bonds - - 896,961 896,961 2026 Revenue Bonds 292,639 - - 292,639 Plant Additions and Construction 1,193,437 243,363 545,163 1, 981,963 Plant - Electric Substation 3,951,000 - - 3, 951,000 Vehicle Replacement Funding - - - - Equipment Replacement Funding - 50,000 250,000 300,000 Debt Reserve Account Funding - - 90,000 90,000 Removal Expenses 10,000 - - 10,000 Total Uses of Cash 17,774,324 4,054,477 4,159,524 25,988,325 Cash Applied to (Used from) Reserves 2,758,091$ (1,318,710)$ 265,610 $ 1,704,991$ 2026 Budget - Uses of Cash 13,353,044$ 2,654,762 $ 3,987,631 $ 19,995,437$ $ Difference 4,421,280$ 1,399,715 $ 171,893 $ 5,992,888$ % Difference 33.11% 52.72% 4.31% 29.97% Page 2 of 3 The above table provides a summary of the 2027 budget as well as a comparison to the 2026 budget. Electric utility uses of cash are forecasted to increase $4,421,300 over the 2026 budget primarily due to an increase in capital improvement spending associated the new business park substation and system conversion projects. The multi-year project will be financed with revenue bond debt and will convert a majority of the remaining 4 kV distribution system to 12 kV. The project is estimated to cost $7.0 million with $4.0 million anticipated to be allocated or spent in 2027. New interest payments on the 2027 Revenue Bond debt financing are budgeted to be $292,600 beginning in 2027 with principal payments commencing in 2028. Purchase power expense is budgeted to increase from serving multiple services for the new large customer located in the industrial park. Electric rates were effective April 1, 2024 and a Test Year 2027 Electric rate case will be submitted to the PSCW late in 2026. The budgeted rate of return is 3.6% vs an authorized 6.3%. Water utility uses of cash are forecasted to increase $1,399,700 from the 2026 budget due to the repayment in full (call) of the 2019 Water Revenue Bonds in the amount of $2,015,000. The bonds are callable as of March 1, 2027 and the utility has adequate cash reserves to pay off the debt and maintain adequate operating reserves. The rehab of wells #2 & #3 in 2026 will delay the need for a new well for the foreseeable future. There are no major street reconstruction projects planned and routine capital replacements are budgeted for 2027. The budgeted rate of return is 1.8% vs an authorized 6.5%. Sewer utility uses of cash are forecasted to increase from the 2026 budget by $171,900 due to equipment replacements at the WWTP and increases in operational costs. The utility will continue to fund the USDA debt reserve account for $90,000 and $250,000 for the equipment replacement fund required by our loan agreements. OPERATING REVENUES Forecasted revenues for each utility were derived using historical consumption data and current rates for each respective utility. Current electric rates were effective April 2024 and a Test Year 2027 Electric rate case will be submitted in late 2026 to account for the new business park substation project. Electric revenues also include a full year of revenues from the new industrial park agricultural customer added in the previous years. Water rates were effective May 2012 with no planned rate adjustments. Sewer rates were effective April 2025 and will be increased effective January 1, 2027 to address operating shortfalls in 2027. A 5.0% increase will be applied to all fixed and variable rates with a separate adjustment to the fixed charge for Major Contributing Industries. OPERATION AND MAINTENANCE EXPENSES The following non-routine or new expenses are included in the 2027 budget. Electric Utility The electric budget includes $122,200 in wage & benefits costs for a new electric apprentice (full year) and Utility Tech position (allocated 70% to Electric). Also included is $292,600 in interest expense for the 2027 Revenue bonds and $31,300 in PSCW costs related to the TY2027 electric rate case. All other expenses budgeted are routine in nature. Water Utility All other expenses budgeted are routine in nature. No well rehab maintenance projects are included in the 2027 budget. Page 3 of 3 Sewer Utility The sewer budget includes new annual maintenance costs for the ABNR upgrade including $30,000 for annual centrifuge re-builds, $6,500 for pigging system replacements and $16,000 in bio tower tuck- pointing at the WWTP. Additional electric power expense to operate greenhouse lighting 24-hours a day is also included in the budget for 2027. All other expenses budgeted are routine in nature PLANT ADDITIONS AND CONSTRUCTION The electric construction budget includes; $221,300 to rebuild overhead line, $317,600 for voltage conversion work, $75,000 for underground cable replacements, $50,000 for transformers and $3,951,000 in substation engineering & equipment procurement (financed with revenue bonds). Plant additions include; $280,000 for a new storage facility at the admin building (70% electric), $85,000 to replace the small dump truck past its useful life, $60,000 to replace the aging trenching machine with a small excavator, $14,000 in wire transportation & handling equipment and $53,600 in asset replacements at the administrative building. The remaining electric plant and construction budget is routine in nature. There are no reconstruction projects planned for 2027. Water plant additions include; $120,000 for a new storage facility at the admin building (30% water), $20,000 in chemical system upgrades at the water treatment facility, $22,500 to replace a ½ ton pick-up truck replacement (split 50% with sewer), $40,200 in asset replacements at the administrative building and $18,500 for distribution system equipment replacements. The remaining water plant budget is routine in nature. There are no reconstruction projects planned for 2027. The sewer construction budget includes $85,000 for cured-in-place pipe lining for 2027. Sewer plant additions include; $275,000 to replace the failing electrical breakers at the wastewater treatment facility, $82,500 in equipment replacements at the WWTP, $40,000 to add an automated transfer switch with SCADA integration for the new generator, $22,500 to replace a ½ ton pick-up truck replacement (split 50% with water) and $40,200 in asset replacements at the administrative building. Please review the individual utility plant addition schedules for detailed listing of budgeted items. DEBT SERVICE The electric utility’s debt obligations will increase with the issuance of the 2027 Revenue Bonds for the new electric substation and conversion projects. A preliminary estimate of $7.0 million is anticipated to be issued to cover the cost of the projects over a three-year period with interest payments beginning 2027. The electric utility is budgeted to meet its required debt coverage requirements in 2027. The water utility is budgeted to call (pay off in full) its remaining principal balance of $2,015,000 on the 2019 Revenue Bonds on the call date of March 1, 2027. The utility has sufficient cash reserves to pay off this remaining debt and maintain adequate operating reserves. The sewer utility’s debt requirements associated with the 2020 and 2021 USDA Revenue Bonds will remain $897,000 annually until 2060. The Utility is budgeted to meet its required debt coverage requirements in 2027. The utility will continue funding a USDA equipment replacement fund as well. SUMMARY The remainder of this budget document provides line-item detail for each utility. In addition, there are three appendices providing relevant planning information pertaining to equipment replacement, debt service, and overall cash position. WAUPUN UTILITIES 2027 Budget - Electric TABLE OF CONTENTS Description Attachment Management Information n/a C a s h F l o w E B - 1 O p e r a t i n g I n c o m e E B - 2 Expenses E B - 3 Plant Additions and Construction E B - 4 Plant Additions and Construction Explanation EB-5 WAUPUN UTILITIES 2027 Budget - Electric MANAGEMENT INFORMATION Page 1 of 2 This section of the budget document presents detailed information related to our proposed 2027 electric utility budget. As presented in Attachment EB-1, we forecasted a budget deficit of $290,909 based on sources and uses of cash of $13,532,415 and $13,823,324, respectively, from reserve balances (without the inclusion of debt financing). With the inclusion of debt financing, a net surplus of $2,758,100 is budgeted for 2027 as bond proceeds will remain to be spent in future budget periods. SOURCES OF CASH The pie chart above presents sources of cash distribution. Sales of electricity represent 65% of total sources. This chart highlights a concentration from three large customers within the Large Industrial Power and Industrial Power category totaling 17% of total sources of cash. The 2027 budget includes $7 million in revenue bonds totaling 34% of total sources of cash. USES OF CASH Our proposed budget indicates that purchased power will account for approximately six of every ten dollars spent in 2027. We forecasted a 2027 purchased power cost of $10,555,737 compared to total operation and maintenance expenses of $11,921,299, accounting for 88.5% of total operational expenditures. Residential 21% Commercial 8% Small Power 7% Large Power 11% Industrial Power 6% Large Industrial  Power 11% Street Lighting 1% Equipment  Replacement 0% Debt Financing 34% Miscellaneous  Revenues 1% 2027 Electric Budget ‐ Sources of Cash WAUPUN UTILITIES 2027 Budget - Electric MANAGEMENT INFORMATION Page 2 of 2 All electric utility cost categories are consistent with the prior year budget with the exception of Plant and Construction which includes an additional $3,951,000 related to the multi-year construction of a new Business Park Substation. SUGGESTED VIEWING ORDER The electric budget schedules are divided into two sections, electric budget and electric budget supplemental schedules. Focus your attention on budget schedules to obtain specific knowledge of proposed 2027 operations, while supplemental budget schedules present management rationale supporting proposed 2027 operations. Purchased Power 59% Plant and  Construction 29% Operation and  Maintenance 8% Debt Service 2%Taxes 2% 2027 Electric Budget ‐ Uses of Cash Waupun Utilities 2027 Budget - Electric Cash Flow Debt Test Year Reserves Financing Total 2023 Schedule Sources of Cash Total Operating Revenues 13,407,415 $ - $ 13,407,415$ 12,110,971 $ Operating income schedule 2027 Revenue Bonds (Substation) - 7,000,000 7,000,000 Vehicle Replacement Fund 85,000 - 85,000 Current equipment purchases Interest Earnings 40,000 - 40,000 - Total Sources of Cash 13,532,415 7,000,000 20,532,415 12,110,971 Uses of Cash Total Operation and Maintenance Expenses 11,921,299 - 11,921,299 10,531,065 Operating income schedule Taxes 405,949 - 405,949 351,986 Operating income schedule Debt Service - - 2027 Revenue Bonds 292,639 - 292,639 - Estimated repayment schedule (I n Plant Additions and Construction - Reserves 1,193,437 - 1,193,437 692,500 Plant/Construction schedule Plant Additions and Construction - Debt Financed - 3,951,000 3,951,000 - Vehicle Replacement Fund - - - - Annual funding Removal Expenses 10,000 - 10,000 10,000 Prior year estimate Total Uses of Cash 13,823,324 3,951,000 17,774,324 11,585,551 Cash Applied to / (Used from) Electric Reserves (290,909)$ 3,049,000 $ 2,758,091 $ 525,420 $ 2027 Budget EB-1 Waupun Utilities 2027 Budget - Electric Operating Income Account 2027 Number OPERATING REVENUES Budget Source Sales of Electricity 440 Residential 4,400,391 $ Consumer Analysis 441 General service (Commercial) 1,539,322 Consumer Analysis 442 Small power - TOD 1,442,242 Consumer Analysis 443.1 Large power - TOD 2,315,265 Consumer Analysis 443.2 Industrial power - TOD 1,250,737 Consumer Analysis 443.3 Large Industrial power - TOD 2,183,036 Consumer Analysis 444 Street & security lighting 151,344 Separate Analysis Total Sales of Electricity 13,282,338 Other 422 Sale of Equipment - 450 Forfeited discounts 15,700 A nnualized '26 Actuals 451 Miscellaneous service revenue 9,200 A nnualized '26 Actuals 454 Rent from electric pr operty 100,177 Pole contact and tower rent Total Operating Revenues 13,407,415 OPERATING EXPENSES Operation and Maintenance 555 Purchased power 10,555,737 Ex pense Schedule 580 Operation and supervision and engineering 120,531 Ex pense Schedule 582 Station 14,428 Ex pense Schedule 583 Overhead line 42,678 Ex pense Schedule 584 Underground line 103,465 Ex pense Schedule 585 Street lighting and signal system 10,275 Ex pense Schedule 586 Meter 17,955 Ex pense Schedule 587 Customer installations 116 Ex pense Schedule 588 Miscellaneous 58,838 Ex pense Schedule 592 Maintenance of station equipment 11,583 Ex pense Schedule 593 Maintenance of overhead lines 119,460 Ex pense Schedule 594 Maintenance of underground lines 82,028 Ex pense Schedule 595 Maintenance of line transformers 153 Ex pense Schedule 596 Maintenance of street lighting 10,486 Ex pense Schedule 597 Maintenance of meters 10,266 Ex pense Schedule 901 Supervision office 15,213 Ex pense Schedule 902 Meter reading labor 11,949 Ex pense Schedule 903 Customer records and collection 109,054 Ex pense Schedule 904 Uncollectible accounts 300 Ex pense Schedule 913 Sales/advertising 907 Ex pense Schedule 920 Administrative and general salaries 94,431 Ex pense Schedule 921 Office supplies 85,181 Ex pense Schedule 923 Outside services employed 54,159 Ex pense Schedule 924 Property insurance 31,141 Ex pense Schedule 925 Injuries and damages 14,757 Ex pense Schedule 926 Employee pensions and benefits 282,693 Ex pense Schedule 928 Regulatory commission 31,320 Ex pense Schedule 930 Miscellaneous 10,821 Ex pense Schedule 932 Maintenance of general plant 21,374 Expense Schedule Total Operation and Maintenance Expenses 11,921,299 403 Depreciation 707,627 Ex pense Schedule 408 Taxes 405,949 Expense Schedule Total Operating Expenses 13,034,875 OPERATING INCOME 372,540$ EB-2 Waupun Utilities 2027 Budget - Electric Expenses Account Actual Actual Actual YTD Budget Budget Number 2023 2024 2025 3 yr Average 7/ 31/2026 2026 2027 Budget Notes/Source OPERATION AND MAINTENANCE EXPENSES 555 Purchased power 8,514,648 $ 8,201,269 $ 9,149,208 $ 8,621,708 $ 5,935,341 $ 9,295,856 $ 10,555,737 $ Separate Analysis 580 Operation, supervision and engineering 45,451 53,182 64,471 54,368 29,215 79,467 120,531 Separate Analysis 582 Station 12,207 10,930 14,008 12,382 8,400 13,639 14,428 Actual 2025 with inflation 583 Overhead line 24,838 33,221 47,569 35,209 23,966 34,218 42,678 Annualized YTD 7/26 with inflation 584 Underground line 30,847 81,284 77,265 63,132 42,006 105,618 103,465 Annualized YTD 7/26 with inflation + 1/3 of new apprentice new salary 585 Street lighting and signal system 6,537 8,430 8,755 7,907 5,791 7,452 10,275 Annualized YTD 7/26 with inflation 586 Meter 11,203 14,127 17,432 14,254 8,194 17,132 17,955 Actual 2025 with inflation 587 Customer installations 197 141 - 113 - 257 116 3 Yr Average with inflation 588 Miscellaneous 27,958 44,905 57,124 43,329 7,410 49,891 58,838 Actual 2025 with inflation 592 Maintenance of station equipment 3,438 3,088 5,266 3,930 6,497 5,813 11,583 Annualized YTD 7/26 with inflation 593 Maintenance of overhead lines 43,721 123,329 97,396 88,149 113,496 162,564 119,460 3 Yr Avg w/ inflation + tree contractor + 1/3 of new Apprentice 594 Maintenance of underground lines 14,679 29,014 19,853 21,182 9,141 47,027 82,028 Annualized YTD 7/26 with inflation + 1/3 of new Apprentice + 70% of Utility Tech 595 Maintenance of line transformers - - 445 148 - 41 153 3 Yr Average with inflation 596 Maintenance of street lighting 5,077 9,187 7,213 7,159 5,903 7,952 10,486 Annualized YTD 7/26 with inflation 597 Maintenance of meters 3,960 7,156 9,967 7,028 3,616 10,087 10,266 Actual 2025 with inflation 901 Supervision office 16,105 19,134 23,415 19,551 11,619 14,471 15,213 Separate Analysis 902 Meter reading labor 9,240 10,222 11,335 10,266 7,105 11,278 11,949 WPPI Shared Service Estimate 903 Customer records and collection 97,843 117,327 98,655 104,608 61,169 107,005 109,054 3 Yr Average with inflation 904 Uncollectible accounts 648 - 216 288 257 225 300 3 Yr Average with inflation 913 Sales/advertising 856 801 986 881 5,401 839 907 3 Yr Average with inflation 920 Administrative and general salaries 65,150 69,138 85,058 73,115 48,600 88,808 94,431 Separate Analysis 921 Office supplies and expenses 76,559 68,429 76,937 73,975 36,770 67,834 85,181 Separate Analysis 923 Outside services employed 36,983 32,407 36,337 35,242 35,130 58,640 54,159 Separate Analysis 924 Property insurance 8,632 11,962 10,845 10,480 21,200 14,432 31,141 Separate Analysis 925 Injuries and damages 8,833 7,587 6,823 7,748 8,302 14,198 14,757 Separate Analysis 926 Employee pensions and benefits 196,512 233,133 242,745 224,130 154,938 258,664 282,693 Separate Analysis, excludes GASB 68 & 75, apprentice training program 928 Regulatory commission 30,408 318 - 10,242 1,025 - 31,320 Actual 2023 Rate Study Cost + Inflation 930 Miscellaneous 11,639 9,356 7,790 9,595 4,812 8,017 10,821 Separate Analysis 932 Maintenance of general plant 21,588 11,636 28,285 20,503 12,641 16,903 21,374 3 Yr Average with inflation TOTAL OPERATION AND MAINTENANCE EXPENSES 9,325,757 9,210,711 10,205,395 9,580,621 6,607,944 10,498,329 11,921,299 403 Depreciation 652,660 667,084 703,404 674,383 410,184 703,172 707,627 Separate Analysis 408 Taxes 300,655 316,192 365,914 327,587 190,205 331,032 405,949 Separate Analysis TOTAL OPERATING EXPENSES 10,279,072$ 10,193,988 $ 11,274,713 $ 10,582,591 $ 7,208,333 $ 11,532,533 $ 13,034,875 $ EB-3 Waupun Utilities 2027 Budget - Electric Plant Additions and Construction Proposed Budget Plant Additions: Meters 10,000$ Replace One-Ton Dump Truck (Unit #149) E - 100% 85,000 Pole Shed @ Admin Bldg. (E-70%, W-30%) 280,000 Spider Wire System E - 100% 14,000 Small scale excavator w/ attachments (Dingo) E - 100% 60,000 Office Admin Upgrades (E-40%, W-30%,S-30%) 45,550 Office Server Upgrade (E-40%, W-30%,S-30%) 8,000 Misc. Tools, Safety Equipment & Testing E - 100% 7,000 Total Plant Additions 509,550$ Routine Construction: Rebuild overhead lines 221,250 $ Underground cable replacements 75,000 Voltage converstion 317,637 LED street lighting 10,000 Transformers 50,000 Services 10,000 Total Construction (Reserve-financed) 683,887$ Plant Additions and Construction (Reserves) 1,193,437 $ Substation Construction (Debt-financed) 3,773,000 Substation Engineering (Debt-financed) 178,000 Total Construction (Debt-financed) 3,951,000 $ Total Plant Additions and Construction 5,144,437 $ EB-4 Waupun Electric Utility Plant and Construction Schedule Explanation 2027 Budget EB-5 Page 1 of 2 PLANT ADDITIONS Vehicle Replacement This budget item includes the replacement of an aging utility one-ton dump truck for $85,000 past its useful life. Small Scale Excavator w/ attachments This purchase of new equipment for $60,000 would aide operations staff with excavation associated with overhead and underground line replacements. The equipment would replace existing trencher equipment past its useful life. Spider System Equipment This budget item includes $14,000 to add equipment to aide operations staff when completing overhead and underground line replacements. Storage Facility at Administrative Building This budget item includes the electric utilities $280,000 portion to construct a new storage facility at the administrative building to house electric and water inventory that will need to be moved with the placement of the new Business Park Substation in the inventory yard. This capital item will be split 70% to Electric & 30% to Water. Meters This budget item includes $10,000 for the purchase of electric meters, which is a routine annual capital outlay. Miscellaneous Tools & Safety Equipment This budget item includes $7,000 to test and replace various tools specific to the electric utility that are in need of replacement. Administrative Building Replacements (Shared between all Utilities) These budget items will replace aging assets at the Utility’s main administrative building and includes the following; office carpeting & painting ($25,690), security upgrades ($7,460), conference room upgrades ($12,400) and replacement of aging server ($8,000). Waupun Electric Utility Plant and Construction Schedule Explanation 2027 Budget EB-5 Page 2 of 2 ROUTINE CONSTRUCTION Rebuild Overhead Line This is an on-going capital outlay of $221,250 to rebuild multiple segments of overhead distribution lines that is aging or near the end of its useful service life. Voltage Conversion The utility plans to continue its conversion upgrade from the 4-kv to the 12-kv system in the amount of $317,637. Underground Cable Replacements The utility has experienced several faults associated with aging underground line segments and is allocating $75,000 to replace several troublesome areas. LED Street Lighting This is a capital outlay of $10,000 to retrofit HPS street lighting with LED lighting. Transformers This is a capital outlay of $50,000 to acquire distribution transformers for both new developments and the replacement of existing, aging equipment. Services This is a capital outlay of $10,000 to install overhead and underground services. MAJOR CONSTRUCTION New Substation and System Conversion The electric utility will continue the planning and procurement process to build a new 12 kv, two transformer substation to be located in the material storage yard behind the utility administration building. The project will also consist of converting existing 4 kV distribution infrastructure to 12 kV and retiring old substation equipment. This project is projected to be a three-year project, commencing in 2026 and will be funded with Revenue Bonds to be issued in full in 2027. The project is estimated to cost $7.0 million over a three-year period of which $3.951 million will be spent in 2027 for engineering, design and equipment procurement. The utility received Wisconsin Public Service Commission approval in 2026 via a Construction Authorization and is proceeding with substation design and equipment procurement as part of the 2027 budget. WAUPUN UTILITIES 2027 Budget - Electric Supplemental Schedules TABLE OF CONTENTS Description Attachment Management Information n/a 2027 Consumer Analysis E S - 1 Usage and Customer Number Comparison, E S - 2 2012 through 2025, 2027 Budget Monthly Electric Consumption – Actual ES-3 2021 through July 2026, 2027 Budget Historical Expenses –2017 through 2025 E S - 4 WAUPUN UTILITIES 2027 Electric Budget – Supplemental Schedules MANAGEMENT INFORMATION Page 1 of 2 This section of the budget document presents supplemental schedules that support our proposed 2027 electric budget. FORECASTED REVENUES Attachment ES-2 and ES-3 present the basis for 2027 forecasted electric sales. Sales figures in the 2027 budget are based on the latest 12 months of usage data, adjusted for extreme weather or known increases/decreases in customer load. Forecasted sales for 2027 are conservative and include adjustments for gains or losses in sales/customers from prior years. The graph above presents monthly electric sales for 2021 through July 2026, as well as forecasted 2027 sales. The yellow bar represents 2027 budgeted sales and shows that forecasted sales are adjusted for extreme weather (note the month of July & August) and changes in customer usage patterns during the summer months. The following graph presents annual sales (kilowatt hours) by customer class for 2017 through 2025, as well as forecasted 2027 sales. For comparative purposes, forecasted 2027 industrial sales include the rate class CP-4 Large Industrial Power. CP-2 Large Power sales decreased since 2016 due to the loss of one customer and from another customer moving to CP-1 Small Power. This trend reversed beginning in 2024 due to the addition of a new Large Power customer in the industrial park. Overall, forecasted electric sales are expected to increase in 2027 as result of higher sales to Large Power customers.  ‐  2,000,000  4,000,000  6,000,000  8,000,000  10,000,000  12,000,000  14,000,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec KWHs Months Yearly Comparison of KWHs Sold by Month 2021 2022 2023 2024 2025 2027 Budget WAUPUN UTILITIES 2027 Electric Budget – Supplemental Schedules MANAGEMENT INFORMATION Page 2 of 2 Attachment ES-2 also presents actual customer numbers by customer class from 2012 through 2025, and budget 2027. This table shows a small increase of 1.9% in forecasted total customers compared to 2025 due to a new multi-family complex being added in 2027. The utility implemented a new GS-3 Large General Service customer class in the Test Year 2023 rate case which shuffled customers between the various Commercial and Small Power customer classes beginning in April 2024. This trend is reflected in the graph above. The main takeaway is there are many factors that go into forecasting electric usage/load and corresponding revenues. This is why we continue to use the latest 12 months of sales as the foundation for our annual sales estimates. Attachment ES-1 presents budgeted revenues based on 2027 sales units at current rates. FORECASTED EXPENSES Attachment ES-4 presents actual operating expenses from 2017 through 2025. This schedule provides historical trends for each operation and maintenance expense that assists in our forecast. 0 5,000,000 10,000,000 15,000,000 20,000,000 25,000,000 30,000,000 35,000,000 40,000,000 45,000,000 2017 2018 2019 2020 2021 2022 2023 2024 2025 2027 Year 2027 Electric Budget ‐ Sales History Residential Commercial Small Power Large Power Industrial Pwr K i l o w a t t H o u r s Waupun Utilities 2027 Budget - Electric Consumer Analysis Customer Class Units Rate Revenue Residential Service, Rg-1 Customer Charge 46,704 13.00 $ 607,152 $ Energy (kWh) 31,806,032 0.1107 $ 3,520,928 PCAC (average) 31,806,032 0.0036 $ 114,502 Total Computed 4,242,581 $ Residential Service Time-of-Day, Rg-2 Customer Charge 1,812 13.00 $ 23,556 $ On-peak Energy Charge (kWh) 402,228 0.1930 $ 77,630 Off-peak Energy Charge (kWh) 828,460 0.0630 $ 52,193 PCAC (average) 1,230,688 0.0036 $ 4,430 Total Computed 157,809 $ General Service, Gs-1 Customer Charge - Single Phase 3,204 16.00 $ 51,264 $ Customer Charge - Three Phase 984 26.00 $ 25,584 Energy (kWh) 5,181,485 0.1144 $ 592,762 PCAC (average) 5,181,485 0.0036 $ 18,653 Total Computed 688,263 $ General Service Time-of-Day, Gs-2 Customer Charge - Single Phase 984 16.00 $ 15,744 $ Customer Charge - Three Phase 84 26.00 $ 2,184 On-peak Energy Charge (kWh) 142,239 0.1955 $ 27,808 Off-peak Energy Charge (kWh) 300,452 0.0655 $ 19,680 PCAC (average) 442,691 0.0036 $ 1,594 Total Computed 67,009 $ General Service Time-of-Day, Gs-3 (20-50 kW) Customer Charge 936 30.00 $ 28,080 $ Demand Charge (kW) 24,227 3.75 $ 90,851 Distribution Demand Charge (kW) 33,883 0.75 $ 25,412 On-peak Energy Charge (kWh) 2,903,797 0.1050 $ 304,899 Off-peak Energy Charge (kWh) 3,784,765 0.0821 $ 310,729 PCAC (average) 6,688,562 0.0036 $ 24,079 Total Computed 784,050 $ Accounting\Budget\2027 Budget\Electric\ Electric UB Budget - 2027.xlsx ES-1, Page 1 of 2 Waupun Utilities 2027 Budget - Electric Consumer Analysis Customer Class Units Rate Revenue Small Power Service, Cp-1 Customer Charge 672 50.00 $ 33,600 $ Demand Charge (kW) 37,454 9.00 $ 337,086 Distribution Demand Charge (kW) 65,377 1.50 $ 98,066 On-peak Energy Charge (kWh) 5,802,018 0.0920 $ 533,786 Off-peak Energy Charge (kWh) 6,700,613 0.0680 $ 455,642 PCAC (average) 12,502,631 0.0036 $ 45,009 Demand/Energy Limiter (60,212) Primary Metering Discount (734) Total Computed 1,442,242 $ Large Power Time-of-Day Service, Cp-2 Customer Charge - Three Phase 168 150.00 $ 25,200 $ Demand Charge (kW) 62,112 12.00 $ 745,344 Distribution Demand Charge (kW) 79,539 1.75 $ 139,193 On-peak Energy Charge (kWh) 9,491,718 0.0828 $ 785,914 Off-peak Energy Charge (kWh) 11,455,958 0.0480 $ 549,886 PCAC (average) 20,947,676 0.0036 $ 75,412 Primary Metering Discount (5,684) Total Computed 2,315,265 $ Industrial Power Time-of-Day Service, Cp-3 Customer Charge - Three Phase 12 250.00$ 3,000 $ Demand Charge (kW) 28,534 14.00 $ 399,476 Distribution Demand Charge (kW) 34,289 2.00 $ 68,578 On-peak Energy Charge (kWh) 5,513,396 0.0771 $ 425,083 Off-peak Energy Charge (kWh) 7,777,831 0.0450 $ 350,002 PCAC (average) 13,291,227 0.0036 $ 47,848 Transformer Ownership Discount (7,411) Primary Metering Discount (35,840) Total Computed 1,250,737 $ Large Industrial Power Time-of-Day Service, Cp-4 Customer Charge - Three Phase 12 250.00$ 3,000 $ Demand Charge (kW) 43,905 17.19 $ 754,727 Distribution Demand Charge (kW) 46,302 2.50 $ 115,755 On-peak Energy Charge (kWh) 9,937,034 0.0660 $ 655,844 Off-peak Energy Charge (kWh) 15,777,907 0.0416 $ 656,361 ECA (average) 25,714,941 (0.0015) $ (38,572) DCA (average) 43,905 1.8140 $ 79,644 Primary Metering Discount (43,722) Total Computed 2,183,036 $ Accounting\Budget\2027 Budget\Electric\ Electric UB Budget - 2027.xlsx ES-1, Page 2 of 2 Waupun Utilities 2027 Budget - Electric Usage and Customer Number Comparison - 2012 through 2027 USAGE: Rg-1 Rg-2 Gs-1 Gs-2 Gs-3 Cp-1 Cp-2 Cp-3 Cp-4 TOTAL Sales Growth YEAR Residential Resident ial General Srv. General Srv. General Srv. Small Power Large Power Industrial Power Lg Industrial Pwr kWh per Y EAR Per Year 2012 30,731,238 10,317,941 - 13,691,461 14,846,400 36,379,200 - 105,966,240 2013 30,641,285 10,093,527 - 13,501,805 14,554,646 36,508,596 - 105,299,859 -0.63% 2014 30,168,609 11,033,159 - 11,665,073 15,510,489 36,265,792 - 104,643,122 -0.62% 2015 29,384,840 10,402,007 - 11,656,010 15,741,500 38,226,847 - 105,411,204 0.73% 2016 30,210,941 10,624,078 - 11,710,962 15,268,121 29,803,092 8,515,200 106,132,394 0.68% 2017 29,299,202 10,132,801 - 12,181,604 14,600,051 11,185,378 26,155,919 103,554,955 -2.43% 2018 30,783,794 958,541 10,776,785 313,130 - 13,101,426 13,466,372 11,646,810 25,675,383 106,722,241 3.06% 2019 31,112,636 1,252,805 10,085,727 616,374 - 14,094,186 12,443,802 10,847,254 26,438,565 106,891,349 0.16% 2020 30,877,872 1,384,676 9,396,750 613,202 - 13,586,784 9,528,359 10,924,264 24,233,527 100,545,434 -5.94% 2021 31,464,453 1,190,302 9,444,287 683,381 - 13,861,199 9,672,097 11,733,641 26,017,352 104,066,712 3.50% 2022 31,303,046 1,077,576 9,547,317 757,120 - 15,098,603 9,518,251 10,934,792 26,668,510 104,905,215 0.81% 2023 30,911,625 1,029,425 9,623,819 735,236 - 14,240,596 12,192,722 10,821,339 26,390,040 105,944,802 0.99% 2024 30,953,143 1,134,143 5,559,501 565,688 5,118,161 12,886,569 14,741,535 11,426,597 24,727,259 107,112,596 1.10% 2025 31,510,928 1,220,352 5,296,893 459,977 6,336,597 12,688,323 17,475,466 11,769,526 25,421,199 112,179,261 4.73% 2027 31,806,032 1,230,688 5,181,485 442,691 6,688,562 12,502,631 20,947,676 13,291,227 25,714,941 117,805,933 5.02% Average Change 0.80% Rg-1 Rg-2 Gs-1 Gs-2 Gs-3 Cp-1 Cp-2 Cp-3 Cp-4 Sales Growth YEAR Residential Residentia l Commercial Commercial General Srv. Small Power Large Power Industrial Power Large Industrial Customer Total Per Year 2012 3,744 461 - 45 8 2 - 4,260 2013 3,763 465 - 45 8 2 - 4,283 0.54% 2014 3,732 477 - 43 9 2 - 4,263 -0.47% 2015 3,738 471 - 44 9 2 - 4,264 0.02% 2016 3,728 461 - 47 9 1 1 4,247 -0.40% 2017 3,733 89 467 - 51 9 1 1 4,351 2.45% 2018 3,721 112 439 42 - 52 9 1 1 4,377 0.60% 2019 3,664 142 400 89 - 64 8 1 1 4,369 -0.18% 2020 3,691 153 408 97 - 63 8 1 1 4,422 1.21% 2021 3,729 135 415 98 - 61 8 1 1 4,448 0.59% 2022 3,760 127 414 101 - 62 7 1 1 4,473 0.56% 2023 3,789 124 422 97 - 60 8 1 1 4,502 0.65% 2024 3,814 136 370 90 67 53 9 1 1 4,541 0.87% 2025 3,814 143 354 89 79 54 12 1 1 4,547 0.13% 2027 3,892 151 349 89 78 56 14 1 1 4,631 1.85% Average Change 0.60% CUSTOMERS: S:\Accounting\Budget\2027 Budget\Electric\ Electric UB Budget - 2027.xlsx ES-2 Waupun Utilities 2027 Budget - Electric Monthly Electric Consumption - Actual 2021 through July 2026 and 2027 Budget Month 2021 2022 2023 2024 2025 2026 3 Yr Average 2026 Budget 2027 Budget January 8,407,848 8,912,064 8,730,880 9,310,487 9,227,143 10,177,726 9,758,371 9,815,378 9,561,487 February 7,791,461 7,984,774 7,921,997 8,193,299 8,359,081 9,098,881 8,719,933 8,916,540 8,356,277 March 8,092,110 8,398,417 8,574,522 8,397,257 8,482,330 9,480,666 8,786,751 8,724,455 9,094,731 April 7,566,659 7,674,688 7,862,298 8,073,247 8,128,270 9,379,165 8,526,894 8,341,485 9,046,561 May 8,127,955 8,607,638 8,415,665 8,420,554 8,449,199 9,501,352 8,790,368 8,683,764 9,286,991 June 9,825,468 9,363,961 9,456,093 9,560,050 10,018,838 10,530,035 10,036,308 10,125,203 10,440,567 July 10,033,058 10,230,087 10,317,896 10,718,794 11,421,901 12,521,230 11,553,975 11,475,960 12,409,108 August 10,422,652 10,119,671 10,509,265 10,184,330 10,489,298 - 10,394,298 10,332,096 10,790,311 September 8,493,216 8,681,365 8,859,868 8,901,965 9,369,483 - 9,043,772 9,063,358 9,675,833 October 8,497,029 8,090,354 8,478,152 8,574,516 9,287,095 - 8,779,921 8,753,146 9,617,688 November 8,277,694 8,157,090 8,230,229 8,225,197 9,036,580 - 8,497,335 8,382,358 9,342,303 December 8,531,562 8,685,106 8,587,937 8,552,900 9,910,043 - 9,016,960 8,713,392 10,184,076 Total 104,066,712 104,905,215 105,944,802 107,112,596 112,179,261 70,689,055 111,904,885 111,327,136 117,805,933 % Change 3.50% 0.81% 0.99% 1.10% 4.73% vs '25 Actuals 5.02% vs '26 Budget 5.82% Month 2021 2022 2023 2024 2025 2026 3 Yr Average 2026 Budget 2027 Budget January 2,645,544 2,813,591 2,605,737 2,689,413 2,805,511 2,871,930 2,788,951 2,805,511 2,871,930 February 2,472,308 2,378,430 2,300,994 2,252,433 2,430,554 2,315,221 2,332,736 2,430,554 2,315,221 March 2,266,090 2,363,543 2,427,736 2,260,881 2,332,485 2,346,497 2,313,288 2,332,485 2,346,497 April 2,030,902 2,161,666 2,159,698 2,074,934 2,114,743 2,203,299 2,130,992 2,114,743 2,203,299 May 2,249,831 2,440,322 2,195,120 2,150,817 2,155,470 2,297,316 2,201,201 2,155,470 2,297,316 June 3,261,611 2,890,391 2,877,529 2,970,331 2,973,167 2,806,735 2,916,744 2,973,167 2,806,735 July 3,432,719 3,428,870 3,455,774 3,619,761 3,702,257 3,968,293 3,763,437 3,702,257 3,968,293 August 3,592,127 3,142,381 3,263,179 3,268,681 3,114,505 - 3,215,455 3,268,681 3,114,505 September 2,324,503 2,437,790 2,448,803 2,565,907 2,478,511 - 2,497,740 2,565,907 2,478,511 October 2,268,603 2,143,865 2,281,049 2,095,166 2,263,019 - 2,213,078 2,095,166 2,263,019 November 2,279,294 2,298,052 2,273,189 2,270,639 2,306,122 - 2,283,317 2,270,639 2,306,122 December 2,640,921 2,804,145 2,622,817 2,734,180 2,834,584 - 2,730,527 2,734,180 2,834,584 Total 31,464,453 31,303,046 30,911,625 30,953,143 31,510,928 18,809,291 31,387,466 31,448,760 31,806,032 % Change 1.90% -0.51% -1.25% 0.13% 1.80% vs '25 Actuals 0.94% vs '26 Budget 1.14% Total Residential (Rg-1) ccounting\Budget\2027 Budget\Electric\ Electric UB Budget - 2027.xlsx ES-3, Page 1 of 5 Waupun Utilities 2027 Budget - Electric Monthly Electric Consumption - Actual 2021 through July 2026 and 2027 Budget Month 2021 2022 2023 2024 2025 2026 3 Yr Average 2026 Budget 2027 Budget January 116,174 103,665 93,689 91,394 110,110 117,139 106,214 110,110 117,139 February 105,602 83,402 81,707 74,348 95,105 89,991 86,481 95,105 89,991 March 94,890 84,004 83,861 75,642 91,214 88,075 84,977 91,214 88,075 April 83,577 75,360 72,531 68,754 83,309 83,516 78,526 83,309 83,516 May 83,659 83,769 73,768 83,352 85,856 85,935 85,048 85,856 85,935 June 115,315 95,863 89,356 109,425 109,439 105,009 107,958 109,439 105,009 July 123,662 112,799 106,638 131,197 135,681 151,385 139,421 135,681 151,385 August 124,538 104,375 101,927 119,424 115,788 - 112,380 119,424 115,788 September 80,291 79,677 78,908 94,542 92,850 - 88,767 94,542 92,850 October 79,751 72,729 75,956 83,239 87,691 - 82,295 83,239 87,691 November 85,246 81,346 80,226 91,291 92,791 - 88,103 91,291 92,791 December 97,597 100,587 90,858 111,535 120,518 - 107,637 111,535 120,518 Total 1,190,302 1,077,576 1,029,425 1,134,143 1,220,352 721,050 1,167,807 1,210,745 1,230,688 % Change -14.04% -9.47% -4.47% 10.17% 7.60% vs '25 Actuals 0.85% vs '26 Budget 1.65% (TY2023 Rate change re-classed customers in GS-1, GS-2, GS-3 & CP-1 categories) Month 2021 2022 2023 2024 2025 2026 3 Yr Average 2026 Budget 2027 Budget January 897,005 981,799 847,119 916,582 471,050 477,502 621,711 767,544 477,502 February 799,997 886,239 783,847 803,386 409,366 389,620 534,124 672,754 389,620 March 745,764 790,333 809,608 398,807 368,044 371,147 379,333 333,960 371,147 April 681,757 696,081 683,528 331,363 334,754 332,356 332,824 277,483 332,356 May 693,823 723,269 725,106 328,085 323,957 323,395 325,146 274,738 323,395 June 848,849 786,797 833,156 366,435 385,234 349,096 366,922 306,852 349,096 July 884,076 881,169 934,580 421,232 493,689 427,570 447,497 352,739 427,570 August 914,291 859,695 939,483 387,694 487,659 - 604,945 324,654 487,659 September 725,027 722,720 765,152 340,063 355,717 - 486,977 284,768 355,717 October 717,399 669,371 736,557 351,166 352,374 - 480,032 294,066 352,374 November 702,677 713,491 752,645 447,115 478,249 - 559,336 374,413 478,249 December 833,622 836,353 813,038 467,573 836,800 - 705,804 391,545 836,800 Total 9,444,287 9,547,317 9,623,819 5,559,501 5,296,893 2,670,686 5,844,652 4,655,518 5,181,485 % Change 0.51% 1.09% 0.80% -42.23% -4.72% vs '25 Actuals -2.18% vs '26 Budget 11.30% Residential (Rg-2) General Service (Gs-1) ccounting\Budget\2027 Budget\Electric\ Electric UB Budget - 2027.xlsx ES-3, Page 2 of 5 Waupun Utilities 2027 Budget - Electric Monthly Electric Consumption - Actual 2021 through July 2026 and 2027 Budget (TY2023 Rate change re-classed customers in GS-1, GS-2, GS-3 & CP-1 categories) Month 2021 2022 2023 2024 2025 2026 3 Yr Average 2026 Budget 2027 Budget January 66,533 76,295 81,426 77,948 60,139 51,148 63,078 68,562 51,148 February 61,650 67,232 75,388 64,935 43,928 41,893 50,252 57,116 41,893 March 57,054 68,096 78,657 55,904 41,716 42,839 46,820 49,172 42,839 April 50,784 60,590 61,527 46,792 38,960 36,668 40,807 41,157 36,668 May 49,181 54,055 50,065 37,548 32,464 29,524 33,179 33,027 29,524 June 50,968 54,858 49,523 37,777 30,413 29,037 32,409 33,228 29,037 July 53,559 58,769 54,760 38,019 32,356 31,581 33,985 33,441 31,581 August 54,519 54,880 54,103 37,682 32,461 - 41,415 33,144 32,461 September 48,630 51,490 49,440 33,475 28,737 - 37,217 29,444 28,737 October 55,216 58,504 52,150 35,723 32,160 - 40,011 31,421 32,160 November 63,846 68,376 56,686 42,800 37,547 - 45,678 37,646 37,547 December 71,441 83,975 71,511 57,085 49,096 - 59,231 50,211 49,096 Total 683,381 757,120 735,236 565,688 459,977 262,690 524,082 497,570 442,691 % Change 11.44% 10.79% -2.89% -23.06% -18.69% vs '25 Actuals -3.76% vs '26 Budget -11.03% (TY2023 Rate change re-classed customers in GS-1, GS-2, GS-3 & CP-1 categories) Month 2021 2022 2023 2024 2025 2026 2/3 Yr Average 2026 Budget 2027 Budg et January - - - - 538,751 580,761 559,756 516,369 581,765 February - - - - 494,941 522,132 508,537 474,379 523,034 March - - - 452,555 501,196 551,803 501,851 480,375 552,757 April - - - 457,948 461,492 508,703 476,048 442,320 509,582 May - - - 470,847 465,400 517,036 484,428 446,066 517,930 June - - - 556,168 529,741 576,420 554,110 507,734 577,416 July - - - 617,011 615,872 690,962 641,282 590,287 692,156 August - - - 650,426 583,736 - 411,387 623,405 584,745 September - - - 522,202 578,609 - 366,937 500,508 579,609 October - - - 467,443 490,677 - 319,373 448,024 491,525 November - - - 426,415 523,635 - 316,683 408,700 524,540 December - - - 497,146 552,547 - 349,898 476,493 553,502 Total - - - 5,118,161 6,336,597 3,947,817 5,490,289 5,914,659 6,688,562 % Change 23.81% vs '25 Actuals 5.55% vs '26 Budget 13.08% General Service (Gs-2) General Service (Gs-3) ccounting\Budget\2027 Budget\Electric\ Electric UB Budget - 2027.xlsx ES-3, Page 3 of 5 Waupun Utilities 2027 Budget - Electric Monthly Electric Consumption - Actual 2021 through July 2026 and 2027 Budget (TY2023 Rate change re-classed customers in GS-1, GS-2, GS-3 & CP-1 categories) Month 2021 2022 2023 2024 2025 2026 3 Yr Average 2026 Budget 2027 Budget January 1,146,564 1,216,398 1,269,150 1,156,131 1,097,366 1,679,245 1,310,914 995,234 1,081,306 February 1,094,300 1,113,923 1,149,113 1,034,797 957,705 996,881 996,461 890,786 943,689 March 1,131,326 1,234,564 1,245,272 1,001,531 980,407 1,024,667 1,002,202 862,150 966,059 April 1,078,731 1,134,981 1,160,685 956,845 930,898 967,182 951,642 823,683 917,274 May 1,120,921 1,216,366 1,261,433 1,014,458 978,553 974,540 989,184 873,278 964,232 June 1,277,595 1,306,892 1,312,676 1,078,346 1,119,011 1,049,587 1,082,315 928,274 1,102,634 July 1,272,019 1,483,027 1,306,473 1,242,080 1,257,544 1,240,428 1,246,684 1,069,222 1,239,140 August 1,290,593 1,514,639 1,237,251 1,188,976 1,153,228 - 1,193,152 1,023,508 1,136,351 September 1,126,217 1,251,643 1,105,925 1,094,093 959,993 - 1,053,337 941,830 945,944 October 1,116,804 1,206,797 1,087,064 1,066,194 1,037,309 - 1,063,522 917,814 1,022,128 November 1,064,562 1,164,829 1,035,140 1,019,948 957,757 - 1,004,282 878,004 943,740 December 1,141,567 1,254,544 1,070,414 1,033,170 1,258,552 - 1,120,712 889,385 1,240,133 Total 13,861,199 15,098,603 14,240,596 12,886,569 12,688,323 7,932,530 13,014,405 11,093,167 12,502,631 % Change 2.02% 8.93% -5.68% -9.51% -1.54% vs '25 Actuals -1.46% vs '26 Budget 12.71% Month 2021 2022 2023 2024 2025 2026 3 Yr Average 2026 Budget 2027 Budget January 702,836 699,423 767,145 1,168,815 1,253,664 1,522,059 1,314,846 1,661,496 1,502,755 February 663,181 608,932 695,696 1,103,392 1,104,792 2,014,618 1,407,601 1,473,156 1,324,304 March 731,317 692,322 760,926 1,173,551 1,182,213 1,745,388 1,367,051 1,590,045 1,417,108 April 693,756 678,459 772,619 1,147,182 1,269,719 1,805,576 1,407,492 1,664,395 1,522,000 May 770,634 872,145 896,657 1,283,269 1,416,480 1,902,868 1,534,206 1,824,312 1,697,921 June 856,566 864,103 957,655 1,252,898 1,547,840 1,998,893 1,599,877 1,942,516 1,855,381 July 856,396 781,101 1,119,467 1,308,768 1,690,626 2,138,566 1,712,653 2,098,458 2,026,537 August 935,460 828,776 1,342,565 1,309,293 1,594,849 - 1,415,569 1,717,125 1,911,730 September 841,382 879,991 1,189,022 1,201,751 1,607,519 - 1,332,764 1,596,427 1,926,918 October 940,879 805,546 1,156,713 1,383,207 1,735,995 - 1,425,305 1,791,039 2,080,921 November 898,305 945,579 1,314,605 1,221,457 1,604,680 - 1,380,247 1,616,133 1,923,515 December 781,385 861,874 1,219,652 1,187,952 1,467,089 - 1,291,564 1,595,784 1,758,586 Total 9,672,097 9,518,251 12,192,722 14,741,535 17,475,466 13,127,968 17,189,175 20,570,882 20,947,676 % Change 1.51% -1.59% 28.10% 20.90% 18.55% vs '25 Actuals 19.87% vs '26 Budget 1.83% Small Power (Cp-1) Large Power TOD (Cp-2) ccounting\Budget\2027 Budget\Electric\ Electric UB Budget - 2027.xlsx ES-3, Page 4 of 5 Waupun Utilities 2027 Budget - Electric Monthly Electric Consumption - Actual 2021 through July 2026 and 2027 Budget Month 2021 2022 2023 2024 2025 2026 3 Yr Average 2026 Budget 2027 Budget January 613,445 779,064 818,197 1,033,164 789,816 763,992 862,324 789,816 763,992 February 513,152 743,595 773,955 758,414 805,268 703,939 755,874 805,268 703,939 March 743,055 846,632 806,566 801,627 802,578 1,128,543 910,916 802,578 1,128,543 April 787,238 717,302 842,188 849,522 800,386 1,225,634 958,514 800,386 1,225,634 May 988,936 956,980 941,891 910,350 936,706 1,190,474 1,012,510 936,706 1,190,474 June 1,159,113 1,037,554 1,062,989 989,390 1,125,289 1,401,204 1,171,961 1,125,289 1,401,204 July 1,226,552 1,266,057 1,157,147 1,130,115 1,288,289 1,656,247 1,358,217 1,288,289 1,656,247 August 1,245,605 1,198,915 1,144,983 1,160,479 1,224,597 - 1,176,686 1,160,479 1,224,597 September 1,210,177 1,059,484 982,737 1,099,195 1,119,224 - 1,067,052 1,099,195 1,119,224 October 1,195,221 856,587 822,517 997,876 1,040,410 - 953,601 997,876 1,040,410 November 1,093,609 734,535 633,548 877,965 961,494 - 824,336 877,965 961,494 December 957,538 738,087 834,621 818,500 875,469 - 842,863 818,500 875,469 Total 11,733,641 10,934,792 10,821,339 11,426,597 11,769,526 8,070,033 11,894,854 11,502,347 13,291,227 % Change 7.41% -6.81% -1.04% 5.59% 3.00% vs '25 Actuals 12.93% vs '26 Budget 15.55% Month 2021 2022 2023 2024 2025 2026 3 Yr Average 2026 Budget 2027 Budget January 2,219,747 2,241,829 2,248,417 2,177,040 2,100,736 2,113,950 2,130,575 2,100,736 2,113,950 February 2,081,271 2,103,021 2,061,297 2,101,594 2,017,422 2,024,586 2,047,867 2,017,422 2,024,586 March 2,322,614 2,318,923 2,361,896 2,176,759 2,182,477 2,181,707 2,180,314 2,182,477 2,181,707 April 2,159,914 2,150,249 2,109,522 2,139,907 2,094,009 2,216,231 2,150,049 2,094,009 2,216,231 May 2,170,970 2,260,732 2,271,625 2,141,828 2,054,313 2,180,264 2,125,468 2,054,313 2,180,264 June 2,255,451 2,327,503 2,273,209 2,199,280 2,198,704 2,214,054 2,204,013 2,198,704 2,214,054 July 2,184,075 2,218,295 2,183,057 2,210,611 2,205,587 2,216,198 2,210,799 2,205,587 2,216,198 August 2,265,519 2,416,010 2,425,774 2,061,675 2,182,475 - 2,223,308 2,061,675 2,182,475 September 2,136,989 2,198,570 2,239,881 1,950,737 2,148,323 - 2,112,980 1,950,737 2,148,323 October 2,123,156 2,276,955 2,266,146 2,094,502 2,247,460 - 2,202,703 2,094,502 2,247,460 November 2,090,155 2,150,882 2,084,190 1,827,567 2,074,305 - 1,995,354 1,827,567 2,074,305 December 2,007,491 2,005,541 1,865,026 1,645,759 1,915,388 - 1,808,724 1,645,759 1,915,388 Total 26,017,352 26,668,510 26,390,040 24,727,259 25,421,199 15,146,990 25,392,155 24,433,488 25,714,941 7.36% 2.50% -1.04% -6.30% 2.81% vs '25 Actuals 1.16% Industrial Power TOD (Cp-3) Large Industrial Power TOD (Cp-4) ccounting\Budget\2027 Budget\Electric\ Electric UB Budget - 2027.xlsx ES-3, Page 5 of 5 Waupun Utilities 2027 Budget - Electric Expenses - Actual 2017 through Actual 2025 Accoun t Actual Actual Actual Actual Actual Actual Actual Actual Actual Number 2017 2018 2019 2020 2021 2022 2023 2024 2025 OPERATION AND MAINTENANCE EXPENSES 555 Purchased power 8,264,959 $ 7,977,884 $ 7,652,205 $ 7,380,142 $ 8,048,579 $ 8,938,573 $ 8,514,648 $ 8,201,269 $ 9,149,208 $ 580 Operation and supervision and engineering 28,612 28,645 38,464 40,192 31,276 35,028 45,451 53,182 64,471 582 Station 9,498 10,546 13,458 20,269 15,597 16,588 12,207 10,930 14,008 583 Overhead line 36,703 43,347 42,687 66,701 13,875 28,507 24,838 33,221 47,569 584 Underground line 36,161 49,329 66,723 72,149 54,053 49,277 30,847 81,284 77,265 585 Street lighting and signal system 14,542 9,920 10,161 8,427 3,671 6,739 6,537 8,430 8,755 586 Meter 11,810 12,548 14,767 14,537 12,462 14,639 11,203 14,127 17,432 587 Customer installations 2,044 1,123 2,866 - 237 409 197 141 - 588 Miscellaneous 9,267 26,285 19,221 4,598 28,710 33,521 27,958 44,905 57,124 592 Maintenance of station equipment 19,844 6,342 7,509 1,146 7,933 10,202 3,438 3,088 5,266 593 Maintenance of overhead lines 74,411 147,778 95,115 70,341 78,162 78,283 43,721 123,329 97,396 594 Maintenance of underground lines 19,557 13,908 27,465 7,887 11,261 18,882 14,679 29,014 19,853 595 Maintenance of line transformers 3,689 581 941 283 2,323 120 - - 445 596 Maintenance of street lighting 4,308 9,480 7,386 4,261 10,657 8,619 5,077 9,187 7,213 597 Maintenance of meters 5,805 7,086 7,927 4,467 3,944 8,188 3,960 7,156 9,967 901 Supervision office 28,139 26,244 30,466 19,035 14,367 15,536 16,105 19,134 23,415 902 Meter reading labor 4,432 4,979 6,022 6,813 7,256 8,243 9,240 10,222 11,335 903 Customer records and collection 74,956 83,304 91,487 95,170 89,401 92,757 97,843 117,327 98,655 904 Uncollectible accounts 621 444 203 - 1,628 - 648 - 216 913 Sales/advertising 600 1,564 1,009 976 1,546 787 856 801 986 920 Administrative and general salaries 23,527 23,122 51,093 64,515 57,170 62,487 65,150 69,138 85,058 921 Office supplies 70,249 73,531 76,362 70,385 71,720 77,604 76,559 68,429 76,937 923 Outside services employed 33,676 32,259 38,813 34,052 35,950 49,993 36,983 32,407 36,337 924 Property insurance 6,581 6,400 7,880 9,566 10,207 11,090 8,632 11,962 10,845 925 Injuries and damages 4,346 2,805 4,749 3,648 4,283 4,753 8,833 7,587 6,823 926 Employee pensions and benefits 199,581 185,666 173,413 152,125 160,729 159,428 196,512 233,133 242,745 928 Regulatory commission 3,211 164 442 7 22 - 30,408 318 - 930 Miscellaneous 6,770 7,083 7,196 8,543 15,016 11,483 11,639 9,356 7,790 932 Maintenance of general plant 13,483 16,504 39,644 19,989 18,008 15,418 21,588 11,636 28,285 TOTAL OPERATION AND MAINTENANCE EXPENSES 9,011,381 8,808,871 8,535,672 8,180,224 8,810,042 9,757,154 9,325,757 9,210,711 10,205,395 403 Depreciation 558,693 575,142 590,846 606,808 617,367 631,951 652,660 667,084 703,404 408 Taxes 342,783 334,706 344,905 334,605 318,251 305,206 300,655 316,192 365,914 TOTAL OPERATING EXPENSES 9,912,857$ 9,718,718 $ 9,471,423 $ 9,121,637 $ 9,745,660 $ 10,694,311 $ 10,279,072 $ 10,193,988 $ 11,274,713 $ $ Change (195,581)$ (194,138) $ (247,295) $ (349,786) $ 624,023 $ 948,652 $ (415,239) $ (85,084) $ 1,080,725$ % Change -1.93% -1.96% -2.54% -3.69% 6.84% 9.73% -3.88% -0.83% 10.60% S:\Accounting\Budget\2027 Budget\Electric\ Electric UB Budget - 2027.xlsx ES-4 WAUPUN UTILITIES 2027 Budget - Water TABLE OF CONTENTS Description Attachment Management Information n/a C a s h F l o w W B - 1 O p e r a t i n g I n c o m e W B - 2 Expenses W B - 3 Plant Additions and Construction W B - 4 Plant Additions and Construction Explanation WB-5 WAUPUN UTILITIES 2027 Budget - Water MANAGEMENT INFORMATION Page 1 of 2 This section of the budget document presents detailed information related to the proposed 2027 water utility budget. As presented in Attachment WB-1, we forecasted a budget deficit of $1,318,710 based on sources of cash and uses of cash of $2,735,767 and $4,054,477, respectively. The water utility will be calling (paying off) its 2019 revenue bonds with surplus cash on-had in the amount of $2,015,000 which is the primary contributed to the 2027 budget deficit. Cash flows from operations without consideration of the full revenue bond pay-back is a budget surplus of $271,878. SOURCES OF CASH The graph below presents sources of cash distribution. Water sales represent 65% of total sources and fire protection represents 29%. Miscellaneous revenues include joint metering, miscellaneous services, generator capacity payments, sales of equipment, use of equipment replacement funds and interest earnings. Attachment WB-2 presents a comparison of budgeted 2027 operating income to the Test Year 2007 Water Rate application (current rate structure). Total 2027 budgeted operating revenues are $82,700 above Test Year 2007 projections even after two simplified rate increases in 2010 and 2012 that provided for an additional $150,000 in revenues. Residential 45% Multifamily 7%Commercial 9% Industrial  2% Public Authority 2% Private Fire  Protection 2% Public Fire  Protection 29% Miscellaneous 4% 2027 Water Budget ‐ Sources of Cash WAUPUN UTILITIES 2027 Budget - Water MANAGEMENT INFORMATION Page 2 of 2 USES OF CASH The graph below present uses of cash distribution. The utility anticipates calling (paying off) the remainder of its 2019 revenue bonds with cash reserves on their March 1, 2027 call date in the amount of $2,015,000. The utility has adequate cash reserve balances to pay the debt in full and maintain adequate operational cash flows. The debt payment represents 50% of the uses of cash in 2027. There are no significant capital or large maintenance projects scheduled for 2027. The last full rate study was performed in 2007. In 2027, no rate adjustment is considered necessary based upon a September 2026 cash flow, debt coverage factor and rate of return metrics all being within acceptable thresholds. SUGGESTED VIEWING ORDER The water budget schedules are divided into two sections, water budget and water budget supplemental schedules. Focus your attention on budget schedules to obtain specific knowledge of proposed 2027 operations, while supplemental budget schedules present management rationale supporting proposed 2027 operations. Operation and  Maintenance 33%Taxes 10% Debt Service 50% Plant and  Construction 7% 2027 Water Budget ‐ Uses of Cash (with Debt Pay‐off) Waupun Utilities 2027 Budget - Water Cash Flow - Budget to Test Year 2007 Comparison 2027 Test Yea r Budget 2007 $ Difference % Difference Sources of Cash Total Operating Revenues 2,685,767 $ 2,545,864 $ 139,903 $ 5.50% Sale of Equipment - - - n/a Interest Earnings 50,000 50,000 - n/a Total Sources of Cash 2,735,767 2,595,864 139,903 5.39% Uses of Cash Total Operation and Maintenance Expenses 1,354,298 838,321 515,977 61.55% Taxes 391,816 306,875 84,941 27.68% Debt Service 2014 Revenue Bonds - 907,610 (907,610) n/a 2019 Revenue Bonds - - - n/a 2019 Refunding Revenue Bonds 2,015,000 - 2,015,000 n/a Equipment Replacement Funds - - - n/a Vehicle Equipment Replacement Funding 50,000 - 50,000 n/a Plant Additions and Construction 243,363 267,700 (24,337) -9.09% Total Uses of Cash 4,054,477 2,320,506 1,733,971 74.72% Cash Applied to / (Used From) Water Reserves (1,318,710)$ 275,358 $ (1,594,068)$ -578.91% Cash Applied to / (Used From) Water Reserves without Debt Repayment 271,878$ WB-1 Waupun Utilities 2027 Budget - Water Operating Income - Budget to Test Year 2007 Comparison Accoun t 2027 Test Year Number Budget 2007 $ Difference % Differenc e OPERATING REVENUES Sales of Water 461.1 Residential 1,229,658 $ 1,286,370 $ (56,712) $ -4.41% 461.2 Multifamily 184,168 - 184,168 n/a 461.3 Commercial 257,889 359,540 (101,651) -28.27% 461.4 Industrial 64,701 147,739 (83,038) -56.21% 462 Private fire protection 47,294 22,812 24,482 107.32% 463 Public fire protection 782,289 674,671 107,618 15.95% 464 Public authorit y 52,590 44,738 7,852 17.55% Total Sales of Water 2,618,59 0 2,535,870 82,720 3.26% Other 422 Sale of equipment - - - 0.00% 470 Forfeited discounts 4,100 4,791 (691) -14.42% 471 Miscellaneous service revenue 3,500 1,569 1,931 123.07% 472 Rent from water property 19,677 - 19,677 n/a 474 Other water revenue s 39,900 3,634 36,266 997.96% Total Operating Revenues 2,685,767 2,545,864 139,903 5.50% OPERATING EXPENSES Operation Source of Supply 601 Supervision 254 4,000 (3,746) -93.66% 611 Structures 274 - 274 n/a 614 Wells - 2,000 (2,000) -100.00% Pumping 620 Supervision and engineering - 1,000 (1,000) -100.00% 623 Power for pumping 105,753 95,399 10,354 10.85% 624 Pumping labor 9,133 32,619 (23,486) -72.00% 626 Miscellaneous 300 4,000 (3,700) -92.50% 631 Structures 111 1,000 (889) -88.94% 633 Pumping equipment 2,109 500 1,609 321.82% Water Treatment 640 Supervision and engineering 126,474 46,270 80,204 173.34% 641 Chemicals 43,234 63,469 (20,235) -31.88% 642 Operation labor 195,869 71,839 124,030 172.65% 643 Miscellaneous 1,700 5,120 (3,421) -66.81% 651 Structures 200 - 200 n/a 652 Treatment equipment 13,405 19,714 (6,309) -32.00% Transmission and Distribution 662 Transmission and Distribution Lines 14,502 - 14,502 n/a 663 Meter 11,106 8,958 2,148 23.98% 664 Customer installations 28,400 - 28,400 n/a 665 Miscellaneous expenses 35,315 - 35,315 n/a 671 Structures - - - n/a 672 Distribution reservoirs 47,832 58,747 (10,915) -18.58% 673 Transmission and distribution mains 83,785 54,463 29,322 53.84% 675 Services 54,396 30,216 24,180 80.02% 676 Meters 16,253 7,269 8,984 123.59% 677 Hydrants 13,046 16,677 (3,631) -21.77% WB-2 Waupun Utilities 2027 Budget - Water Operating Income - Budget to Test Year 2007 Comparison Accoun t 2027 Test Year Number Budget 2007 $ Difference % Differenc e Customer Accounts 901 Supervision 15,213 17,500 (2,287) -13.07% 902 Meter reading labor 9,498 12,362 (2,864) -23.17% 903 Accounting and collecting labor 98,458 44,652 53,806 120.50% 904 Uncollectible accounts - 200 (200) -100.00% Administrative and General 920 Salaries 79,218 13,523 65,695 485.80% 921 Office supplies 52,605 42,686 9,919 23.24% 923 Outside services employed 46,113 32,000 14,113 44.10% 924 Property insurance 21,687 11,553 10,134 87.72% 925 Injuries and damages 12,245 13,600 (1,355) -9.96% 926 Employee pensions and benefits 171,067 116,352 54,715 47.03% 928 Regulatory commission - 1,000 (1,000) -100.00% 930 Miscellaneous 1,766 800 966 120.72% 932 General plan t 42,977 8,833 34,144 386.56% TOTAL OPERATION AND MAINTENANCE 1,354,298 838,321 515,977 61.55% 403 Depreciation 642,195 490,129 152,066 31.03% 408 Taxes 391,816 306,875 84,941 27.68% TOTAL OPERATING EXPENSES 2,388,309 1,635,325 752,984 46.04% OPERATING INCOME 297,458$ 910,539 $ (613,081)$ -67.33% WB-2 Waupun Utilities 2027 Budget - Water Expenses Account Actual Actual Actual 3 Yr YTD Budget Budget Number OPERATING EXPENSES 2023 2024 2025 Average 7/31/2026 2026 2027 Budget Notes/Source OPERATION AND MAINTENANCE Source of Supply 601 Operation Labor and Expenses 195$ 544 $ - $ 246 $ 227 $ 298 254 3 yr. avg. with inflation 611 Structures and Improvements 798 - - 266 - 274 274 3 yr. avg. with inflation 614 Wells and Springs 990 4,826 2,419 2,745 2,739 - - Well Rehab (every 10 years) Pumping 620 Operation Supervision and engineering - - - - - - - Historical trends 623 Fuel or Power Purchased for Pumping 80,846 74,531 78,901 78,093 59,893 80,691 105,753 Annualized YTD 7/26 with inflation 624 Pumping Labor and Expenses 1,782 13,515 11,303 8,867 5,373 5,462 9,133 3 yr. avg. with inflation 626 Miscellaneous Expenses - 36 - 12 38 300 300 Historical trends 631 Structures and Improvements 297 25 - 107 - 412 111 3 yr. avg. with inflation 633 Pumping Equipment 2,825 3,318 - 2,048 2,373 2,290 2,109 3 yr. avg. with inflation Water Treatment 640 Operation Supervision and Engineering 63,275 98,385 112,265 91,308 42,347 62,390 126,474 Separate Analysis 641 Chemicals 44,776 36,751 44,397 41,975 22,787 45,852 43,234 3 yr. avg. with inflation 642 Operation Labor and Expenses 91,879 102,192 170,390 121,487 110,247 164,158 195,869 Annualized YTD 7/26 with inflation 643 Miscellaneous Expenses 1,781 1,548 1,621 1,650 981 1,734 1,700 3 yr. avg. with inflation 651 Structures and Improvements - - 322 107 - 200 200 Historical trends 652 Maintenance of Water Treatment Equipment 1,635 196,920 25,951 74,835 372 13,014 13,405 2026 budget with inflation Transmission and Distribution 662 Transmission and Distribution Lines 21,946 6,947 13,347 14,080 468 13,309 14,502 3 yr. avg. with inflation 663 Meter 4,001 4,543 5,428 4,657 6,222 5,675 11,106 Annualized YTD 7/ 26 with inflation 664 Customer Installations 27,672 27,672 27,048 27,464 15,778 28,280 28,400 2026 budget with inflation 665 Miscellaneous expenses 19,552 28,258 28,847 25,552 19,761 24,227 35,315 Annualized YTD 7/ 26 with inflation 671 Maintenance of Structures and Improvements - - - - - - - Historical trends 672 Maintenance of Distribution Reservoirs 43,092 52,405 43,092 46,196 28,000 48,000 47,832 Separate Analysis 673 Maintenance of Transmission and Distribution Mains 72,409 50,258 48,830 57,166 47,352 76,335 83,785 Annualized YTD 7/ 26 with inflation 675 Services 44,114 41,056 50,083 45,084 28,925 39,740 54,396 3 yr. avg. with inflation + 15% Util Tech 676 Meters 3,193 1,919 1,884 2,332 9,185 2,230 16,253 Annualized YTD 7/ 26 with inflation 677 Hydrants 5,425 15,406 17,168 12,666 3,457 12,301 13,046 3 yr. avg. with inflation Customer Accounts 901 Supervision 13,397 15,078 16,352 14,942 9,309 14,471 15,213 Separate Analysis 902 Meter reading labor 7,713 8,468 8,531 8,237 5,797 9,413 9,498 WPPI provided estimates for 2027 903 Customer Accounts 86,966 102,763 87,105 92,278 55,276 90,534 98,458 Annualized YTD 7/ 26 with inflation 904 Uncollectible accounts - - 105 35 109 - - Historical trends WB-3 Page 1 of 2 Waupun Utilities 2027 Budget - Water Expenses Account Actual Actual Actual 3 Yr YTD Budget Budget Number OPERATING EXPENSES 2023 2024 2025 Average 7/31/2026 2026 2027 Budget Notes/Source Administrative and General 920 Salaries 53,743 56,934 62,205 57,627 38,731 74,337 79,218 Separate Analysis 921 Office supplies 46,615 49,171 51,073 48,953 31,402 50,646 52,605 Actual 2025 with Inflation 923 Outside services employed 41,888 69,164 23,257 44,770 23,454 54,845 46,113 3 yr. avg. with inflation 924 Property insurance 15,525 17,602 16,579 16,569 11,378 20,457 21,687 Separate Analysis 925 Injuries and damages 10,682 8,580 9,554 9,605 6,849 11,646 12,245 Separate Analysis 926 Employee pensions and benefits 124,538 134,366 158,637 139,180 95,770 186,850 171,067 Separate Analysis, excludes GASB 68 & 75 928 Regulatory commission - - - - - - - No PSC charges anticipated 930 Miscellaneous 3,509 543 1,091 1,714 792 1,685 1,766 3 yr. avg. with inflation 932 Maintenance of general plant 22,831 62,261 40,085 41,726 14,724 37,001 42,977 3 yr. avg. with inflation 959,890 1,285,985 1,157,870 1,134,582 700,114 1,179,057 1,354,298 403 Depreciation 569,126 549,014 545,506 554,549 344,570 626,864 642,195 Based on estimated plant balances 408 Taxes 336,766 336,686 399,234 357,562 198,768 317,190 391,816 Separate Analysis TOTAL OPERATING EXPENSES 1,865,782$ 2,171,685 $ 2,102,610 $ 2,046,692 $ 1,243,452 $ 2,123,111 $ 2,388,309 $ TOTAL OPERATION AND MAINTENANCE WB-3 Page 2 of 2 Waupun Utilities 2027 Budget - Water Plant Additions and Construction Proposed Budget Plant Additions: Water meters & meter modules 22,200$ Chemical Scale Replacements 20,000 Pole Shed @ Admin Bldg. (E-70%, W-30%) 120,000 Replace 5 Water Loggers 7,500 Trailer Wagon Replacements 8,500 Pick-up Truck Replacment - 1/2 ton (Unit #146) (S-50%,W-50%) 22,500 Floor Scrubbing Machine (S-50%,W-50%) 2,500 Office Admin Upgrades (E-40%, W-30%,S-30%) 34,163 Office Server Upgrade (E-40%, W-30%,S-30%) 6,000 Total Plant Additions 243,363 $ Construction: - Total Plant Additions and Construction 243,363 $ WB-4 Waupun Water Utility Plant and Construction Schedule Explanation 2027 Budget W B - 5 PLANT ADDITIONS Water Meters This budget item includes $22,200 to replace 1 1/2” and larger water meters in addition to new meters for anticipated developments. Chemical Scale Replacements – Water Treatment Facility Chemical scale equipment at the Water Treatment Facility is approaching the end of its useful live and will require replacement. This item is budgeted for $20,000. Storage Facility at Administrative Building This budget item includes the water utilities $120,000 portion to construct a new storage facility at the administrative building to house electric and water inventory that will need to be moved with the placement of the new Business Park Substation in the inventory yard. This capital item will be split 70% to Electric & 30% to Water. Vehicle Replacement This budget item includes the replacement of a ½ ton pick-up truck and will be split between the water & sewer utilities with the sewer allocation being $22,500. Equipment Replacements This budget item includes $7,500 to replace five water loggers utilized by the distribution crew and $8,500 for trailer wagon replacements past their useful lives Floor Scrubbing Machine This budget item includes the water utilities $2,500 portion to purchase a floor scrubbing machine to be used at both the water and sewer treatment facilities. This capital item will be split 1/2 between the two utilities. Administrative Building Replacements (Shared between all Utilities) These budget items will replace aging assets at the Utility’s main administrative building and includes the following; office carpeting & painting ($19,270), security upgrades ($5,600), conference room upgrades ($9,300) and replacement of aging server ($6,000). CONSTRUCTION No construction work is budgeted for 2027. WAUPUN UTILITIES 2027 Budget - Water Supplemental Schedules TABLE OF CONTENTS Description Attachment Management Information n/a 2027 Consumer Analysis W S - 1 Water Usage Comparison by Customer Class WS-2 1995 through 2025, and Budget 2027 M o n t h l y W a t e r C o n s u m p t i o n C o m p a r i s o n W S - 3 2021 through July 2026 and Budget 2027 Historical Expenses – 2016 through 2025 W S - 4 WAUPUN UTILITIES 2027 Water Budget - Supplemental Schedules MANAGEMENT INFORMATION Page 1 of 3 This section of the budget document presents supplemental schedules that support our proposed 2027 water budget. FORECASTED REVENUES Sales figures in the 2026 budget are based on the latest 12 months of usage data, adjusted for extreme weather or known increases/decreases in customer usage. The above graph presents monthly water sales for 2022 through July 2026, as well as forecasted 2027 sales. The yellow bar represents 2027 sales and shows that forecasted sales are adjusted for extreme weather (note the months of July and August). Attachments WS-2 and WS-3 present the basis for forecasted water sales. Attachment WS-2 presents actual water usage by customer class from 1995 through 2026 and forecasted 2027. Forecasted 2027 sales are 0.8% higher than actual 2025 sales based on historical trends and year-to-date July 2026 sales. Forecasted 2027 sales are 31.7% lower than peak sales in 1998. The following graph presents annual sales by customer class for 2016 through 2025, as well as forecasted 2027 sales. Residential sales have decreased consistently since 1998 due to conservation. Forecasted 2027 residential sales are 0.5% higher than actual 2025 sales.  ‐  2,000,000  4,000,000  6,000,000  8,000,000  10,000,000  12,000,000  14,000,000  16,000,000  18,000,000  20,000,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Gallons Months Water Sold by Month ‐ Annual Comparison  2022 2023 2024 2025 2026 2027 Budget WAUPUN UTILITIES 2027 Water Budget - Supplemental Schedules MANAGEMENT INFORMATION Page 2 of 3 The usage history graph also shows industrial sales are more volatile and less predictable. In 2014, the multifamily residential class was created resulting in a decrease in commercial sales. The following graph presents a history of customer numbers by customer class.  ‐  20,000,000  40,000,000  60,000,000  80,000,000  100,000,000  120,000,000 G a l l o n s S o l d YEAR 2027 Water Budget ‐ Usage History Residential Commercial Industrial Public Authority Multifamily 50% 55% 60% 65% 70% 75% 80% 85% 90% 95% 100% 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 % o f T o t a l Year Water Customers by Customer Class Public Authority Industrial Commercial Multifamily Residential WAUPUN UTILITIES 2027 Water Budget - Supplemental Schedules MANAGEMENT INFORMATION Page 3 of 3 The following graph presents a history of water sales by customer class. The previous graphs illustrate differences between the makeup of total customer numbers and sales by customer class. The residential, multifamily and commercial classes contain on average 99% of total customers and account for 87% of total sales, from 2016 through 2025. The industrial and public authority classes contain on average 1% of total customers but account for 13% of total sales, from 2016 through 2025. HISTORICAL EXPENSES Attachment WS-4 presents actual operating expenses from 2016 through 2025. This schedule provides historical trends for each operation and maintenance expense, providing a sound basis for our forecast when specific information is not present. 50% 55% 60% 65% 70% 75% 80% 85% 90% 95% 100% 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 % o f T o t a l Year Water Customers by Customer Class Public Authority Industrial Commercial Multifamily Residential Waupun Utilities 2027 Budget - Water Consumer Analysis - Total Volume Charges: Per 100 Residential Multifamily Commercial Industrial Public Author ity Total Cubic Ft. Cubic Ft. Units Amount Units Amount Units Amount Units Amount U nits Amount Units Amount First 1,300 5.34 $ 133,002 710,230 $ 10,901 58,209 $ 13,241 70,709 $ 1,084 5,787 $ 1,806 9,646 $ 160,034 854,581 $ Next 7,000 5.23 $ 1,559 8,154 16,163 84,534 16,594 86,784 3,527 18,445 2,889 15,111 40,732 213,029 Next 58,300 4.38 $ - - 2,928 12,825 10,620 46,516 6,951 30,446 2,931 12,839 23,431 102,626 Over 66,000 3.48 $ - - - - - - 1,641 5,712 442 1,537 2,083 7,249 134,561 718,384 $ 29,992 155,568 $ 40,455 204,009 $ 13,203 60,390 $ 8,069 39,133 $ 226,280 1,177,485$ Meter Charges: Average Annual Average Annual Average Annual Average Ann ual Average Annual Average Annual Per Billing Meters Revenues Meters Revenues Meters Revenues Meters Reve nues Meters Revenues Meters Revenues 5/8" 13.82 $ 28,152 389,061 146 2,018 1,452 20,067 - - 72 995 29,822 412,140 3/4" 13.82 $ 8,810 121,754 90 1,244 1,058 14,622 48 663 60 829 10,066 139,112 1" 19.13 $ 24 459 276 5,280 396 7,575 12 230 96 1,836 804 15,381 1-1/2" 29.76 $ - - 554 16,487 176 5,238 12 357 132 3,928 874 26,010 2" 42.52 $ - - 84 3,572 132 5,613 72 3,061 36 1,531 324 13,776 3" 63.78 $ - - - - 12 765 - - 24 1,531 36 2,296 4" 90.35 $ - - - - - - - - 12 1,084 12 1,084 6" 143.50 $ - - - - - - - - 12 1,722 12 1,722 8" 212.59 $ - - - - - - - - - - - - 36,986 511,274 $ 1,150 28,600 $ 3,226 53,879 $ 144 4,311$ 444 13,457$ 41,950 611,522 $ Total Revenues per Analysis 1,229,658 $ 184,168 $ 257,889 $ 64,701 $ 52,590 $ 1,789,007 $ S:\Accounting\Budget\2027 Budget\Water\Water UB Budget - 2027 FINAL.xlsx WS-1 Waupun Utilities 2027 Budget - Water Sales in Gallons from 1995 through 2025 Year Residential Multifamily Commercial Industrial Public Authority Total Water Sold Change in Water Usage 1995 123,906,703 37, 610,234 58,772,867 7,591,211 227,881,015 1996 124,444,000 39, 276,000 59,867,000 6,443,000 230,030,000 0.94% 1997 123,301,307 42, 453,937 67,595,040 6,476,334 239,826,618 4.26% 1998 126,169,022 44, 376,944 69,364,358 7,986,705 247,897,029 3.37% 1999 126,037,972 44, 078,367 62,162,730 8,107,291 240,386,360 -3.03% 2000 125,981,202 45, 245,220 56,862,444 8,046,998 236,135,864 -1.77% 2001 124,940,410 46, 069,467 55,391,696 6,475,345 232,876,918 -1.38% 2002 125,732,068 45, 870,352 55,590,612 6,099,192 233,292,224 0.18% 2003 124,904,032 44, 811,184 60,843,068 6,286,192 236,844,476 1.52% 2004 122,511,928 45, 187,428 56,779,184 5,968,292 230,446,832 -2.70% 2005 124,281,696 43, 945,000 44,846,340 5,961,560 219,034,596 -4.95% 2006 119,560,320 44, 910,668 27,748,556 6,054,312 198,273,856 -9.48% 2007 119,264,860 46, 295,216 27,899,640 6,002,700 199,462,416 0.60% 2008 112,935,284 45, 834,448 19,523,548 6,304,892 184,598,172 -7.45% 2009 110,199,848 44, 665,324 11,979,220 5,807,472 172,651,864 -6.47% 2010 110,097,477 45, 918,576 6,326,584 9, 082,216 171,424,853 -0.71% 2011 108,159,304 42, 313,163 12,911,228 9,344,764 172,728,459 0.76% 2012 108,656,724 41, 436,208 28,818,944 5,533,704 184,445,580 6.78% 2013 106,199,544 39, 614,080 23,359,292 3,380,212 172,553,128 -6.45% 2014 100,753,356 22, 524,524 18,802,476 16,920,508 3,836,492 162,837,356 -5.63% 2015 99,431,640 22, 245,520 18,726,180 18,704,488 4,336,904 163,444,732 0.37% 2016 98,740,488 21, 050,171 18,918,341 20,434,612 4,253,876 163,397,488 -0.03% 2017 98,201,180 21, 940,336 18,756,302 18,524,220 4,356,352 161,778,390 -0.99% 2018 99,179,726 22, 481,955 24,290,745 11,671,855 5,583,460 163,207,741 0.88% 2019 102,174,927 20, 450,994 25,908,033 13,448,479 5,783,938 167,766,370 2.79% 2020 102,660,412 21, 460,116 23,600,293 12,850,037 3,707,346 164,278,204 -2.08% 2021 100,598,033 22, 190,215 24,850,287 11,265,663 4,714,972 163,619,170 -0.40% 2022 98,261,867 23, 011,052 27,658,071 18,572,239 5,232,070 172,735,298 5.57% 2023 101,132,030 22, 957,604 26,802,681 21,707,654 5,835,950 178,435,918 3.30% 2024 100,339,207 22, 906,848 27,457,249 22,277,737 5,497,434 178,478,475 0.02% 2025 100,137,233 23, 100,594 28,411,763 10,324,614 5,890,161 167,864,365 -5.95% 2027 100,658,625 22, 435,576 30,262,444 9,876,531 6, 035,782 169,268,957 0.84% Average Change in Usage 1995 - 2027 -0.88% S:\Accounting\Budget\2027 Budget\Water\ Water UB Budget - 2027 FINAL.xlsx WS-2 Waupun Utilities 2027 Budget - Water Water Usage - Actual 2021 through July 2026 and 2027 Budget Month 2021 2022 2023 2024 2025 2026 3 YR AVERAGE 2026 Budge t 2027 Budget January 17,213 18,272 18,790 19,598 18,706 18,016 18,773 18,766 18,016 February 16,014 17,239 17,077 19,332 17,024 17,000 17,785 17,073 16,971 March 17,389 19,492 18,337 20,306 18,703 17,830 18,946 18,795 17,815 April 17,331 17,343 18,308 19,156 17,513 17,581 18,083 17,514 17,565 May 19,771 20,565 22,040 21,230 20,042 21,438 20,903 20,212 21,270 June 21,663 19,984 22,355 19,725 19,764 20,631 20,040 19,658 20,401 July 19,281 20,431 21,757 21,332 20,783 23,122 21,746 20,517 22,574 August 19,496 21,211 21,356 21,417 19,708 - 20,827 21,411 19,631 September 17,693 19,563 19,625 20,355 17,987 - 19,322 20,324 18,072 October 17,445 19,204 19,462 19,891 18,743 - 19,365 19,799 18,558 November 17,287 18,414 19,687 18,064 17,354 - 18,368 18,078 17,367 December 18,144 19,196 19,739 18,185 18,075 - 18,666 18,235 18,040 Total 218,727 230,913 238,534 238,591 224,402 135,618 232,827 230,382 226,280 % Change -0.40% 5.57% 3.30% 0.02% -5.95% 27 Bud. Vs '25 Act 0.84% Month 2021 2022 2023 2024 2025 2026 3 YR AVERAGE 2026 Budge t 2027 Budget January 11,105 10,824 10,692 10,954 10,933 10,936 10,941 10,933 10,936 February 10,014 9,507 9,591 9,972 9,793 9,626 9,797 9,793 9,626 March 10,785 10,363 10,552 10,891 10,739 10,680 10,770 10,739 10,680 April 10,808 10,391 10,563 10,701 10,691 10,479 10,624 10,691 10,479 May 12,216 12,100 12,486 12,093 12,178 12,560 12,277 12,178 12,560 June 13,115 11,859 12,955 11,853 12,021 12,098 11,991 12,021 12,098 July 11,919 11,984 12,582 11,957 12,200 12,873 12,343 12,200 12,873 August 11,598 11,564 11,908 11,885 11,569 - 11,787 11,885 11,569 September 10,774 10,479 11,038 11,333 10,770 - 11,047 11,333 10,770 October 10,777 10,851 10,956 10,922 11,108 - 10,995 10,922 11,108 November 10,537 10,445 10,751 10,500 10,751 - 10,667 10,500 10,751 December 10,832 10,990 11,120 11,073 11,111 - 11,101 11,073 11,111 Total 134,480 131,357 135,194 134,134 133,864 79,252 134,341 134,268 134,561 % Change -2.01% -2.32% 2.92% -0.78% -0.20% 27 Bud. Vs '25 Act 0.52% Total Residential S:\Accounting\Budget\2027 Budget\Water\ Water UB Budget - 2027 FINAL.xlsx WS-3, Page 1 of 3 Waupun Utilities 2027 Budget - Water Water Usage - Actual 2021 through July 2026 and 2027 Budget Month 2021 2022 2023 2024 2025 2026 3 YR AVERAGE 2026 Budge t 2027 Budget January 2,376 2,493 2,710 2,547 2,575 2,487 2,536 2,575 2,487 February 2,123 2,375 2,300 2,392 2,362 2,244 2,333 2,362 2,244 March 2,313 2,421 2,356 2,474 2,728 2,330 2,511 2,728 2,330 April 2,282 2,468 2,681 2,423 2,620 2,422 2,488 2,620 2,422 May 2,459 2,721 2,674 2,442 2,599 2,521 2,521 2,599 2,521 June 2,596 2,402 2,604 2,413 2,588 2,450 2,484 2,588 2,450 July 2,708 2,436 2,589 2,470 2,652 2,781 2,634 2,652 2,781 August 2,738 2,544 2,471 2,612 2,573 - 2,552 2,612 2,573 September 2,538 2,564 2,660 2,669 2,588 - 2,639 2,669 2,588 October 2,587 2,621 2,600 2,898 2,555 - 2,684 2,898 2,555 November 2,458 2,665 2,500 2,665 2,577 - 2,581 2,665 2,577 December 2,486 3,051 2,544 2,617 2,464 - 2,542 2,617 2,464 Total 29,664 30,761 30,690 30,622 30,881 17,235 30,504 31,585 29,992 % Change 3.40% 3.70% -0.23% -0.22% 0.85% 27 Bud. Vs '25 Act -2.88% Month 2021 2022 2023 2024 2025 2026 3 YR AVERAGE 2026 Budge t 2027 Budget January 2,357 2,847 3,050 2,797 3,461 3,148 3,135 3,461 3,148 February 2,575 2,953 3,072 3,007 2,853 3,480 3,113 2,853 3,480 March 2,740 2,887 2,991 2,732 2,959 3,414 3,035 2,959 3,414 April 2,675 2,860 2,713 2,880 2,799 3,081 2,920 2,799 3,081 May 3,021 3,224 3,189 3,225 3,202 3,745 3,391 3,202 3,745 June 3,232 3,289 3,283 3,157 3,051 3,436 3,215 3,051 3,436 July 2,943 3,427 3,039 3,352 3,496 3,991 3,613 3,496 3,991 August 2,958 3,341 3,115 3,382 3,529 - 3,342 3,382 3,529 September 2,816 3,068 2,904 3,348 3,195 - 3,149 3,348 3,195 October 2,701 3,214 2,933 3,301 3,371 - 3,202 3,301 3,371 November 2,592 2,948 2,866 2,641 2,870 - 2,792 2,641 2,870 December 2,610 2,916 2,674 2,883 3,195 - 2,917 2,883 3,195 Total 33,220 36,973 35,830 36,705 37,981 24,295 37,824 37,376 40,455 % Change 5.30% 11.30% -3.09% 2.44% 3.48% 27 Bud. Vs '25 Act 6.51% Multi- Family Commercial S:\Accounting\Budget\2027 Budget\Water\ Water UB Budget - 2027 FINAL.xlsx WS-3, Page 2 of 3 Waupun Utilities 2027 Budget - Water Water Usage - Actual 2021 through July 2026 and 2027 Budget Month 2021 2022 2023 2024 2025 2026 3 YR AVERAGE 2026 Budge t 2027 Budget January 1,071 1,658 1,819 2,792 1,313 979 1,695 1,313 979 February 937 2,004 1,740 3,467 1,656 1,180 2,101 1,656 1,180 March 1,188 3,362 1,979 3,750 1,956 993 2,233 1,956 993 April 1,154 1,150 2,004 2,731 1,021 1,174 1,642 1,021 1,174 May 1,191 1,485 2,413 2,342 1,114 1,321 1,592 1,114 1,321 June 1,874 1,789 2,630 1,667 1,186 1,525 1,459 1,186 1,525 July 1,051 1,853 2,630 2,859 1,231 1,706 1,932 1,231 1,706 August 1,599 3,083 2,806 2,662 955 - 2,141 2,662 955 September 971 2,604 2,411 2,228 867 - 1,835 2,228 867 October 891 2,066 2,478 2,159 878 - 1,838 2,159 878 November 1,343 1,918 3,135 1,843 751 - 1,910 1,843 751 December 1,790 1,855 2,974 1,281 874 - 1,710 1,281 874 Total 15,060 24,827 29,019 29,781 13,802 8,878 22,088 19,650 13,203 % Change -12.33% 64.86% 16.88% 2.63% -53.66% 27 Bud. Vs '25 Act -4.34% Month 2021 2022 2023 2024 2025 2026 3 YR AVERAGE 2026 Budge t 2027 Budget January 304 450 519 508 424 466 466 484 466 February 365 400 374 494 360 470 441 409 441 March 363 459 458 459 321 413 398 413 398 April 412 474 347 421 382 425 409 383 409 May 884 1,035 1,279 1,128 949 1,291 1,123 1,119 1,123 June 846 645 882 635 918 1,122 892 812 892 July 660 731 917 694 1,204 1,771 1,223 938 1,223 August 603 679 1,056 876 1,082 - 1,005 870 1,005 September 594 848 612 777 567 - 652 746 652 October 489 452 495 611 831 - 646 519 646 November 357 437 435 415 405 - 418 429 418 December 426 384 427 331 431 - 396 381 396 Total 6,303 6,994 7,802 7,349 7,874 5,958 8,069 7,503 8,069 % Change 27.18% 10.97% 11.54% -5.80% 7.14% 27 Bud. Vs '25 Act 2.47% Public Authority Industrial S:\Accounting\Budget\2027 Budget\Water\ Water UB Budget - 2027 FINAL.xlsx WS-3, Page 3 of 3 Waupun Utilities 2027 Budget - Water Expenses - Actual 2016 through Actual 2025 Account Actual Actual Actual Actual Actual Actual Actual Actual Actual Ac tual Number 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Source of Supply 601 Supervision 18 $ 188 $ 351 $ 299 $ 18 $ 364 $ 130 $ 195 $ 544 $ - $ 611 Structures - - - - - - - 798 - - 614 Wells 55,163 2,828 51,590 242 44,648 522 31,868 990 4,826 2,419 Pumping 620 Supervision and engineering - - - - - - - 623 Power for pumping 83,551 85,070 93,540 87,127 79,429 79,203 89,708 80,846 74,531 78,901 624 Pumping labor 1,200 560 312 511 356 1,095 612 1,782 13,515 11,303 626 Miscellaneous 117 353 15 136 - 1,584 18 - 36 - 631 Structures 79 - 605 - - - 878 297 25 - 633 Pumping equipment 695 4,314 315 844 - 492 526 2,825 3,318 - Water Treatment 640 Supervision and engineering 39,693 41,680 43,521 45,966 53,046 43,973 50,432 63,275 98,385 112,265 641 Chemicals 34,578 31,968 32,564 31,603 23,834 29,280 33,877 44,776 36,751 44,397 642 Operation labor 108,142 112,705 98,270 82,966 83,072 85,851 94,030 91,879 102,192 170,390 643 Miscellaneous 1,597 1,999 1,253 1,583 1,881 2,779 1,721 1,781 1,548 1,621 651 Structures 150 - 4,434 - - - - - - 322 652 Maintenance of treatment equipment 99,814 7,818 5,100 12,865 8,273 201 502 1,635 196,920 25,951 Transmission and Distribution 662 Transmission and distribution lines 4,385 3,338 13,378 3,912 6,162 5,387 9,871 21,946 6,947 13,347 663 Meter 4,442 3,364 2,613 4,966 4,629 3,875 4,240 4,001 4,543 5,428 664 Customer Installations - 26,041 22,896 22,896 29,527 27,024 27,024 27,672 27,672 27,048 665 Miscellaneous expenses 1,845 52 4,612 16,448 22,185 18,328 22,754 19,552 28,258 28,847 671 Structures - - - - - - - - - - 672 Distribution reservoirs 31,808 35,090 35,087 40,375 44,160 38,822 38,856 43,092 52,405 43,092 673 Transmission and distribution mains 68,682 129,196 120,500 112,065 64,382 90,317 99,669 72,409 50,258 48,830 675 Services 51,817 74,611 60,271 44,340 66,285 63,927 30,578 44,114 41,056 50,083 676 Meters 8,954 2,834 2,070 4,096 1,891 3,886 1,383 3,193 1,919 1,884 677 Hydrants 18,700 31,899 41,972 16,468 10,819 9,181 14,997 5,425 15,406 17,168 Customer Accounts 901 Supervision 25,350 26,605 25,402 27,180 16,793 13,775 13,840 13,397 15,078 16,352 902 Meter reading labor 1,948 3,794 3,858 4,912 5,606 6,319 7,050 7,713 8,468 8,531 903 Accounting and collecting labor 71,382 73,241 78,662 82,453 87,884 81,476 87,397 86,966 102,763 87,105 904 Uncollectible accounts 87 522 269 110 - 12 - - - 105 Administrative and General 920 Salaries 21,971 24,396 24,155 24,841 46,631 48,294 52,232 53,743 56,934 62,205 921 Office supplies 43,011 39,690 41,044 40,271 40,490 41,197 43,231 46,615 49,171 51,073 923 Outside services employed 46,498 29,543 25,173 21,560 27,501 43,743 48,691 41,888 69,164 23,257 924 Property insurance 9,743 10,973 10,703 13,103 14,432 15,048 16,130 15,525 17,602 16,579 925 Injuries and damages 4,802 8,400 3,315 5,684 5,191 6,337 6,024 10,682 8,580 9,554 926 Employee pensions and benefits 126,717 118,546 100,910 108,216 109,930 109,277 117,099 124,538 134,366 158,637 928 Regulatory commission - 25 - - - - - - - - 930 Miscellaneous 553 543 543 543 770 696 855 3,509 543 1,091 932 Maintenance of general plant 15,924 12,187 13,671 32,434 19,723 22,519 22,678 22,831 62,261 40,085 TOTAL OPERATION AND MAINTENANCE 983,416 944,373 962,974 891,015 919,548 894,784 968,901 959,890 1,285,985 1,157,870 403 Depreciation 542,960 555,740 540,154 536,069 578,406 576,974 543,807 569,126 549,014 545,506 408 Taxes 361,989 359,116 384,455 380,293 379,130 361,737 347,557 336,766 336,686 399,234 TOTAL OPERATING EXPENSES 1,888,365$ 1,859,229 $ 1,887,583 $ 1,807,377 $ 1,877,084 $ 1,833,495 $ 1,860,265 $ 1,865,782 $ 2,171,685 $ 2,102,610 $ $ Change (from prior year) (3,476)$ (29,136) $ 28,354 $ (80,206) $ 69,707 $ (43,589) $ 26,770 $ 5,517 $ 305,903$ (69,075) $ % Change (from prior year) -0.18% -1.54% 1.53% -4.25% 3.86% -2.32% 1.46% 0.30% 16.40% -3.18% S:\Accounting\Budget\2027 Budget\Water\ Water UB Budget - 2027 FINAL.xlsx WS-4 WAUPUN UTILITIES 2027 Budget - Sewer TABLE OF CONTENTS Description Attachment Management Information n/a C a s h F l o w SB-1 O p e r a t i n g I n c o m e SB-2 Expenses S B - 3 Plant Additions and Construction S B - 4 Plant Additions and Construction Explanation SB-5 WAUPUN UTILITIES 2027 Budget - Sewer MANAGEMENT INFORMATION Page 1 of 2 This section of the budget document presents detailed information related to the 2027 sewer utility budget. As presented in Attachment SB-1, we forecasted a budget surplus of $265,610 based on sources of cash and uses of cash of $4,425,134 and $4,159,524, respectively. SOURCES OF CASH The 2027 sewer budget sources of cash distribution are presented in the graph above. The sources of cash include a five-percent rate increase for fixed and usages rates in addition to a separate increase in the fixed charge for major contributing industries. Metered revenue makes up 92% of sewer sources of cash generated from operations in 2027. Miscellaneous fees are amounts billed to State of Wisconsin Prison, Dodge Correctional Institution, Burke Center and other high strength users for Lab/Sampling fees to cover costs associated with sampling and analyzing their waste streams. Trucked-in-waste continues to serve as a rate subsidy to all general customers and is forecasted to decrease from prior years due to the new ABNR processes at the WWTP. Biomass sales are not anticipated in 2027 until the biological processes are optimized. Attachment SB-2 presents a comparison of 2027 budgeted revenues to the forecasted revenues from the Test Year 2025 rate analysis approved in 2024 (the last full rate case year). The schedule provides insight into the adequacy and progress of the rate increases implemented since April 2020, including the 2027 rate increase. Sewer rates will be reviewed at least every two years to determine the adequacy of rate recovery. Residential 28% Commercial 11% Industrial  1% Public Authority 51% Trucked‐In Waste 4% Miscellaneous 4% Equip.Repl. Funds 0% Investment Income 1% 2027 Sewer Budget ‐ Sources of Cash  WAUPUN UTILITIES 2027 Budget - Sewer MANAGEMENT INFORMATION Page 2 of 2 Attachment SB-2 indicates budgeted 2027 revenues are higher than Test Year 2025 forecasts with the inclusion of the 2027 sewer rate increase. Revenues and operating income would have fallen short had the 2027 increase not been implemented. Overall, operating revenues are forecasted to be $310,221 or 8.3% higher than the Test Year 2025 rate design with the inclusion of the 2027 increase. USES OF CASH A use of cash distribution is presented below. Operation and maintenance expenses comprise 56% of total cash requirements in 2027 including newer operating costs associated with the ABNR processes. Plant and construction outflows consist routine equipment replacements at the wastewater treatment plant and cured in place pipe line for the sewer collection system. Debt service includes annual payments associated with the 2020/2021 USDA Revenue. The utility will continue to fund the revenue bond required reserve account and begin funding an equipment replacement account for select ABNR infrastructure. SUGGESTED VIEWING ORDER The sewer budget schedules are divided into two sections, sewer budget and sewer budget supplemental schedules. Focus your attention on budget schedules to obtain specific knowledge of proposed 2027 operations, while supplemental budget schedules present management rationale supporting proposed 2027 operations. Operation and  Maintenance 56% Depreciation on  Meters 1% Debt Service 22% Debt Reserve  Funding 2% Equip. Repl.  Funding 6% Plant and  Construction 13% 2027 Sewer Budget ‐ Uses of Cash  Waupun Utilities 2027 Budget - Sewer Cash Flow - Budget to TY 2025 Comparison TY 2025 2027 Revenue Budget Requirement $ Difference Sources of Cash Total Operating Revenues 4,385,134 $ 4,033,561 $ 351,573 $ Equipment replacement funds - - - Sale of Equipment - - - Investment Income 40,000 40,000 - Total Sources of Cash 4,425,134 4,073,561 351,573 Uses of Cash Total Operation and Maintenance Expenses 2,344,900 2,304,079 40,821 Debt Service 2020/21 USDA Bonds 896,961 896,982 (22) Debt reserve account 90,000 90,000 - Depreciation on meters 32,500 32,500 - USDA Equipment Replacement Account Funding (A) 250,000 250,000 - Vehicle Replacement Funding - - n/a Plant Additions and Construction 545,163 500,000 45,163 Total Uses of Cash 4,159,524 4,073,561 85,963 Cash Applied to / (Used From) Sewer Reserves 265,610$ - $ 265,610$ (A) This fund is required by the USDA as a condition of obtaining the 2020/21 Sewer Revenue Bonds. The amounts being set aside annually will be used to fund future replacements of specific ABNR short-lived assets. SB-1 Waupun Utilities 2027 Budget - Sewer Operating Income - Budget to TY 25 Comparison TY 2025 Account 2027 Revenue Numbe r Budget Requirement $ Difference % Difference OPERATING REVENUES Wastewater Revenues 722.1 Residential 1,242,229 $ 1,175,350 $ 66,879 $ 5.69% 722.2 Commercial 494,105 457,155 36,950 8.08% 722.3 Industrial 58,227 33,530 24,697 73.66% 722.4 Public authorit y 2,260,761 2,079,066 181,695 8.74% Total Metered Revenue 4,055,322 3,745,101 310,221 8.28% Other 722 Sale of equipment - - - 0.00% 725 Other sewerage services 172,900 133,500 39,400 29.51% 731 Forfeited discounts 3,600 3,800 (200) -5.26% 735 Miscellaneous operating revenues 153,312 151,160 2,152 1.42% Total Operating Revenues 4,385,134 4,033,561 351,573 8.72% OPERATING EXPENSES Operation 820 Supervision and labor 126,474 146,400 (19,926) -13.61% 821 Power for pumping 435,506 361,206 74,300 20.57% 823 Chemicals 211,124 262,000 (50,876) -19.42% 827 Operating supplies 69,968 81,452 (11,484) -14.10% 828 Laboratory labor 72,814 74,663 (1,849) -2.48% 829 Laboratory supplies 39,024 51,046 (12,022) -23.55% Total Operating 954,910 976,767 (21,857) -2.24% Maintenance 831 Sewage collection system 179,712 143,452 36,260 25.28% 832 Pumping equipment 8,943 7,902 1,041 13.17% 833 Treatment plant equipment 233,591 241,008 (7,417) -3.08% 834 General plant 189,597 177,610 11,987 6.75% Total Maintenance 611,843 569,972 41,871 7.35% Customer Accounts Expenses 840 Accounting and collecting 152,262 154,080 (1,818) -1.18% 842 Meter reading 9,191 8,675 516 5.95% Total Customer Accounts 161,453 162,755 (1,302) -0.80% Administrative and General Expenses 850 General office salaries 79,218 67,470 11,748 17.41% 851 General office supplies 86,263 91,860 (5,597) -6.09% 852 Outside services 80,523 90,738 (10,214) -11.26% 853 Property insurance 69,580 62,272 7,308 11.74% 854 Employee pensions and benefits 244,992 247,005 (2,013) -0.81% 856 Miscellaneous general 56,117 35,240 20,877 59.24% Total Administrative and General 616,694 594,585 22,109 3.72% Total Operation and Maintenance Expense 2,344,900 2,304,079 40,821 1.77% 403 Depreciation 1,814,329 1,781,463 32,866 1.84% TOTAL EXPENSES 4,159,229 4,085,542 73,687 1.80% OPERATING INCOME 225,906$ (51,981) $ 277,886 $ -534.59% SB-2 Waupun Utilities 2027 Budget - Sewer Expenses Account Actual Actual Actual YTD Budget Budget Number 2023 2024 2025 7/31/2026 2026 2027 B udget Notes / Source 820 Supervision and labor 133,683 $ 125,073 $ 123,830 $ 127,529 $ 42,119 $ 62,390 $ 126,474 $ Separate Analysis 821 Power for pumping 235,989 294,880 376,247 302,372 256,970 386,626 435,506 Separate Analysis - Add'l greenhouse lighting 823 Chemicals 213,743 105,693 173,834 164,423 88,211 238,100 211,124 Separate Analysis 827 Operating supplies 37,447 33,375 40,242 37,021 38,296 83,900 69,968 Separate Analysis 828 Laboratory labor 62,053 70,312 69,449 67,271 40,814 68,964 72,814 Annualized YTD 7/26 with inflation 829 Laboratory supplies 30,851 48,890 39,915 39,885 22,101 44,642 39,024 Annualized YTD 7/26 with inflation Total Operating 713,766 678,223 823,517 738,502 488,512 884,622 954,910 831 Sewage collection system 149,839 165,869 152,933 156,214 97,052 161,204 179,712 Annualized YTD 7/26 with inflation + 15% of Utility Tech 832 Pumping equipment 9,823 11,052 6,488 9,121 5,031 6,617 8,943 Annualized YTD 7/26 with inflation 833 Treatment plant and equipment 157,926 174,098 226,666 186,230 102,553 256,832 233,591 Annualized YTD 7/ 26 with inflation 834 General plant 177,181 212,830 162,212 184,074 99,356 178,042 189,597 3 yr. avg.with inflation Total Maintenance 494,769 563,849 548,299 535,639 303,992 602,695 611,843 840 Accounting and collecting 138,497 149,154 136,037 141,229 85,675 140,273 152,262 Annualized YTD 7/26 with inflation 842 Meter reading 7,108 7,863 7,886 7,619 5,514 9,109 9,191 WPPI provided estimates for 2026 Total Customer Accounts 145,605 157,017 143,923 148,848 91,189 149,382 161,453 850 Administrative and general salaries 55,211 57,855 66,452 59,839 41,671 74,337 79,218 Separate analysis 851 General office supplies 73,078 63,879 75,495 70,817 48,855 65,644 86,263 Annualized YTD 7/26 with inflation 852 Outside services 37,409 75,460 91,568 68,146 42,366 54,115 80,523 Separate analysis 853 Insurance 41,286 60,404 58,620 53,437 37,069 66,843 69,580 Separate analysis 854 Employee pensions and benefits 247,747 231,993 241,057 240,266 128,325 257,649 244,992 Separate Analysis, excludes GASB 68 & 75 856 Miscellaneous general 35,177 72,167 56,105 54,483 25,152 46,646 56,117 3 yr. avg.with inflation Total Administrative and General 489,908 561,758 589,297 546,988 323,438 565,235 616,694 Total Operation and Maintenance 1,844,048 1,960,847 2,105,036 1,969,977 1,207,130 2,201,934 2,344,900 403 Depreciation 715,815 1,043,800 1,393,140 1,050,918 1,057,038 1,775,815 1,814,329 Separate analysis TOTAL OPERATING EXPENSES 2,559,863$ 3,004,647 $ 3,498,176 $ 3,020,895 $ 2,264,168 $ 3,977,749 $ 4,159,229 $ Operating Expenses Maintenance Expenses Customer Accounts Expenses Administrative and General Expenses 3 yr. Average SB-3 Waupun Utilities 2027 Budget - Sewer Plant Additions and Construction Proposed Budget Plant Additions: Item Building Utility Allocation Replace WWTP Feeder Breakers entrie plant 275,000 $ Replace Raw Sludge Pipeline Digester Bldg #80 17,500 Final Clarifier Launder Covers Clarifiers Final 27,500 Automatic Transfer Switch (SCADA Integration) Generator 40,000 MCC-A Transformer Replacement Pump & Blower Bldg. 10,000 WWTP Samplers (2) Collection 25,000 Pick-up Truck Replacment - 1/2 ton (Unit #146) WWTP Bldg (S-50%,W-50%) 22,500 Floor Scrubbing Machine WWTP Bldg (S-50%,W-50%) 2,500 Office Admin Upgrades (E-40%, W-30%,S-30%) 34,163 Office Server Upgrade (E-40%, W-30%,S-30%) 6,000 Total Plant Additions 460,163$ Construction: Sewer main CIPP lining 85,000 Total Plant Additions and Construction 545,163$ ER - Denotes Plant Addition is eligible to be funded through Equipment Replacement fund reserves SB-4 Waupun Sewer Utility Plant and Construction Schedule Explanation 2027 Budget S B - 5 PLANT ADDITIONS Wastewater Treatment Plant Equipment Replacements Various equipment replacements are necessary at the wastewater treatment facilities including; feeder breaker replacements ($275,000), raw sewage pipeline replacement ($17,500), MCC-A transformer replacement ($10,000), final clarifier launder covers ($27,500) and various sampler replacements ($25,000). Automatic Transfer Switch This budget item totaling $40,000 will allow for SCADA integration with the new stand-by generator. Administrative Building Replacements (Shared between all Utilities) These budget items will replace aging assets at the Utility’s main administrative building and includes the following; office carpeting & painting ($19,270), security upgrades ($5,600), conference room upgrades ($9,300) and replacement of aging server ($6,000). Vehicle Replacement This budget item includes the replacement of a ½ ton pick-up truck and will be split between the water & sewer utilities with the sewer allocation being $22,500. Floor Scrubbing Maching This budget item includes the sewer utilities $2,500 portion to purchase a floor scrubbing machine to be used at both the water and sewer treatment facilities. This capital item will be split 1/2 between the two utilities. CONSTRUCTION Cure-In-Place Pipe Lining This budget item includes $85,000 to complete Cure-In-Place pipe lining. WAUPUN UTILITIES 2027 Budget - Sewer Supplemental Schedules TABLE OF CONTENTS Description Attachment Management Information n/a 2027 Consumer Analysis S S - 1 Sewer Usage Comparison by Customer Class SS-2 1995 through 2025, and Budget 2027 Monthly Sewer Consumption Comparison SS-3 2021 through July 2026 and Budget 2027 Historical Expenses – 2016 through 2025 S S - 4 Sewer Revenue Analysis – Loadings S S - 5 2021 through July 2026 and Budget 2027 WAUPUN UTILITIES 2027 Sewer Budget – Supplemental Schedules MANAGEMENT INFORMATION Page 1 of 3 This section of the budget document presents supplemental schedules that support the proposed 2027 sewer budget. FORECASTED REVENUES Sales figures in the 2027 budget are based on the latest 12 months of usage data, adjusted for extreme weather or known increases/decreased in customer usage. The graph above presents monthly sewer sales for 2022 through July 2026, as well as forecasted 2027 sales. The yellow bar represents 2027 sales and shows that forecasted sales are adjusted for extreme weather and other events that affect wastewater discharge including changes in customer usage patterns. Attachments SS-2 and SS-3 present the basis for forecasted sewer sales. Attachment SS-2 presents actual usage by customer class from 1995 through 2025 and forecasted 2027. Forecasted 2027 sales are relatively similar to 2025. The following graph presents annual sales by customer class for 2016 through 2025, as well as forecasted 2027 sales. Residential sales remain similar to prior years while Commercial and Industrial sales are forecasted to increase slightly. Public Authority sales are forecasted to continue to be stable in 2027 after the volitivity experienced in 2020 and 2021 from the three correctional facility customers. Consumption from Public Authority customers continues to be lower than historical experiences with this trend forecasted indefinitely into the future. Forecasted 2027 residential sales are 1.3% lower than actual 2016 sales.  ‐  5,000,000  10,000,000  15,000,000  20,000,000  25,000,000  30,000,000  35,000,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Gallons Months Sewer Sales by Month ‐ Annual Comparison  2022 2023 2024 2025 2026 2027 Budget WAUPUN UTILITIES 2027 Sewer Budget – Supplemental Schedules MANAGEMENT INFORMATION Page 2 of 3 Public authority revenues can be volatile due to changes made within the correctional facilities operations as shown above. Flows and loadings from the correctional facilities have fluctuated over the last ten years with significant reductions in 2020. Forecasted 2027 sales are based on the actual 12 months’ sales ending July 2026. Forecasted 2027 loading sales are also based upon the most recent 12 months of sales ending July 2026. The following graph provides a history of customer numbers by customer class.  ‐  5,000,000  10,000,000  15,000,000  20,000,000  25,000,000  30,000,000  35,000,000 C u b i c F e e t Year 2027 Sewer Budget ‐ Metered Sales History Residential Commercial Industrial Public Authority 50% 55% 60% 65% 70% 75% 80% 85% 90% 95% 100% 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 % o f T o t a l Year Sewer Customers by Customer Class Public Authority Industrial Commercial Residential WAUPUN UTILITIES 2027 Sewer Budget – Supplemental Schedules MANAGEMENT INFORMATION Page 3 of 3 The following graph provides a history of sales by customer class. The previous graphs illustrate differences between the makeup of total customer numbers and sales by customer class. The residential class contains on average 89% of total customers but accounts for only 31% of total sales. The public authority class contains less than 1% of total customers but accounts for 51% of total sales, due to correctional facility flows and loadings. HISTORICAL EXPENSES Attachment SS-4 presents actual operating expenses from 2016 through 2025. This schedule provides historical trends for each operation and maintenance expense, providing a basis for our forecast. 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 % o f T o t a l Year Sewer Sales by Customer Class Public Authority Industrial Commercial Residential Waupun Utilities 2027 Budget - Sewer Consumer Analysis - Total Volume Charges: Per 100 Residential Commercial Industrial Public Authority Total Cubic Ft. Units Amount Units Amount Units Amount Units Amount Units Amoun t City Limits 6.05 $ 133,992 810,652 $ 68,338 413,445 $ 9,052 54,765 $ 226,233 1,368,712 $ 437,615 2,647,573 $ BOD 0.75 $ - - 7,980 5,985 - - 84,604 63,453 92,584 69,438 SS 0.58 $ - - 5,028 2,916 - - 219,736 127,447 224,764 130,363 Phos 45.64 $ - - 24 1,095 - - 253 11,547 277 12,642 SUBTOTALS 133,992 810,652 81,370 423,442 9,052 54,765 530,826 1,571,159 755,240 2,860,017 Meter Charges: ** Average Annual Average Annual Average Annual Average Annual Average Annual Per Billing Meters Revenues Meters Revenues Meters Revenues Meters Reve nues Meters Revenues 5/8" (10) 11.72 $ 35,816 419,764 2,372 27,800 24 281 88 1,031 38,300 448,876 3/4" (20) 11.72 $ 990 11,603 264 3,094 12 141 8 94 1,274 14,931 1" (30) 17.63 $ 12 212 624 11,001 12 212 92 1,622 740 13,046 1-1/2" (40) 27.48$ - - 726 19,950 - - 98 2,693 824 22,644 2" (50) 39.29 $ - - 204 8,015 72 2,829 32 1,257 308 12,101 3" (60) 66.87 $ - - 12 802 - - 48 3,210 60 4,012 4" (70) 106.26 $ - - - - - - 12 1,275 12 1,275 6" 204.74 $ - - - - - - - - - - 8" 322.91 $ - - - - - - - - - - Burke 2,703.53 $ - - - - - - 12 32,442 12 32,442 DCI 26,915.74 $ - - - - - - 12 322,989 12 322,989 WCI 26,915.74 $ - - - - - - 12 322,989 12 322,989 SUBTOTALS 36,818 431,578 4,202 70,663 120 3,462 414 689,602 41,554 1,195,306 Total Revenues per Analysis 1,242,229 $ 494,105 $ 58,227$ 2,260,761 $ 4,055,322$ S:\Accounting\Budget\2027 Budget\Sewer\ Sewer UB Budget - 2027 FINAL.xlsx SS-1 Waupun Utilities 2027 Budget - Sewer Usage Comparison by Customer Class - Sales in Cubic Feet from 1995 through 2025 Year Residential Commercial Industrial Public Authority Total Sewer Usage Change in Sewer Usage 1995 16,409,579 4, 824,260 2, 230,525 17, 424,910 40,889,274 1996 16,443,205 5, 025,870 2, 004,977 21, 643,393 45,117,445 10.34% 1997 16,273,716 5, 477,700 2, 597,830 21, 304,577 45,653,823 1.19% 1998 16,661,513 5, 721,610 2, 703,644 19, 371,386 44,458,153 -2.62% 1999 16,657,527 5, 737,373 2, 564,233 21, 490,337 46,449,470 4.48% 2000 16,671,003 5, 865,512 2, 434,011 19, 112,905 44,083,431 -5.09% 2001 16,501,436 6, 105,438 1, 551,221 21, 060,402 45,218,497 2.57% 2002 16,608,100 6, 015,600 1, 650,800 22, 641,600 46,916,100 3.75% 2003 16,538,200 5, 868,400 1, 545,400 21, 857,400 45,809,400 -2.36% 2004 16,263,300 5, 918,200 1, 758,000 22, 042,000 45,981,500 0.38% 2005 16,470,600 5, 775,900 2, 101,400 22, 543,000 46,890,900 1.98% 2006 15,857,700 5, 867,100 1, 923,400 22, 475,100 46,123,300 -1.64% 2007 15,812,900 5, 888,000 1, 481,400 23, 147,800 46,330,100 0.45% 2008 14,962,800 5, 637,400 1, 145,800 24, 989,500 46,735,500 0.88% 2009 14,587,100 5, 428,900 707,500 24, 472,300 45,195,800 -3.29% 2010 14,673,400 5, 281,300 301,600 24, 781,500 45,037,800 -0.35% 2011 14,390,100 5, 202,300 449,200 21, 043,600 41,085,200 -8.78% 2012 14,449,000 5, 272,800 768,400 23, 245,300 43,735,500 6.45% 2013 14,135,400 5, 079,000 748,800 23, 944,800 43,908,000 0.39% 2014 13,473,100 5, 305,900 848,700 25, 228,400 44,856,100 2.16% 2015 13,235,500 5, 291,200 838,700 25, 674,800 45,040,200 0.41% 2016 13,143,100 5, 146,300 870,400 27, 505,200 46,665,000 3.61% 2017 13,072,200 5, 264,500 961,800 26, 031,100 45,329,600 -2.86% 2018 13,197,500 5, 937,000 684,500 28, 043,700 47,862,700 5.59% 2019 13,605,700 5, 796,600 633,300 30, 286,700 50,322,300 5.14% 2020 13,674,500 5, 465,300 392,500 27, 628,600 47,160,900 -6.28% 2021 13,396,000 5, 899,000 290,400 20, 691,200 40,276,600 -14.60% 2022 13,086,300 6, 202,100 366,300 19, 847,700 39,502,400 -1.92% 2023 13,459,200 6, 477,900 497,100 24, 183,200 44,617,400 12.95% 2024 13,358,700 6, 651,600 472,100 24, 336,300 44,818,700 0.45% 2025 13,330,900 6, 703,100 615,200 22, 335,500 42,984,700 -4.09% 2027 13,399,200 6,833,800 905,200 22,623,340 43,761,540 1.81% Average Change in Usage from 1995 - 2025 0.31% S:\Accounting\Budget\2027 Budget\Sewer\ Sewer UB Budget - 2027 FINAL.xlsx SS-2 WAUPUN UTILITIES 2027 Budget - Sewer Sewer Usage - Actual 2021 through July 2026 and 2027 Budget 2021 2022 2023 2024 2025 2026 3 YR AVERAGE 2026 Budget 2027 Budget January 33,756 29,297 35,553 36,045 36,087 37,504 35,238 35,022 35,312 February 32,413 28,638 34,042 35,398 33,497 36,460 34,011 33,062 34,497 March 32,553 27,557 35,370 39,909 34,645 34,484 34,745 34,627 34,990 April 33,236 31,684 37,303 36,985 37,070 38,814 36,626 35,659 36,864 May 34,910 33,111 38,472 38,120 38,215 40,049 37,784 36,807 38,679 June 36,909 35,259 40,398 39,111 36,873 38,622 38,024 37,545 38,585 July 35,413 35,395 38,851 42,300 36,660 40,348 39,106 38,319 40,449 August 35,927 35,790 38,992 38,943 35,931 - 37,448 38,495 37,334 September 33,877 34,414 38,045 36,946 34,990 - 36,126 37,075 35,842 October 32,987 34,119 36,588 34,973 35,872 - 35,319 35,697 35,423 November 31,146 34,640 36,409 34,491 34,378 - 34,503 34,643 34,686 December 29,639 35,120 36,151 34,966 35,629 - 34,552 34,631 3 4 , 9 5 4 Totals 402,766 395,024 446,174 448,187 429,847 266,281 433,480 431,580 437,615 % Change -14.60% -1.92% 12.95% 0.45% -4.09% 27 Bud. Vs '25 Act 1.81% 2021 2022 2023 2024 2025 2026 3 YR AVERAGE 2026 Budget 2027 Budget January 11,075 10,799 10,663 10,927 10,904 10,909 10,913 10,904 10,909 February 9,988 9,486 9,568 9,949 9,768 9,603 9,773 9,768 9,603 March 10,759 10,341 10,523 10,864 10,711 10,655 10,743 10,711 10,655 April 10,773 10,358 10,528 10,665 10,656 10,447 10,589 10,656 10,447 May 12,127 12,041 12,380 12,041 12,073 12,478 12,197 12,073 12,478 June 13,034 11,788 12,871 11,808 11,974 12,018 11,933 11,974 12,018 July 11,870 11,916 12,511 11,898 12,137 12,796 12,277 12,137 12,796 August 11,558 11,519 11,829 11,825 11,512 - 11,722 11,825 11,512 September 10,716 10,438 10,986 11,223 10,710 - 10,973 11,223 10,710 October 10,744 10,807 10,919 10,871 11,061 - 10,950 10,871 11,061 November 10,511 10,410 10,724 10,471 10,721 - 10,639 10,471 10,721 December 10,805 10,960 11,090 11,045 11,082 - 11,072 11,045 1 1 , 0 8 2 Totals 133,960 130,863 134,592 133,587 133,309 78,906 133,783 133,658 133,992 % Change -2.04% -2.31% 2.85% -0.75% -0.21% 27 Bud. Vs '25 Act 0.51% TOTAL RESIDENTIAL S:\Accounting\Budget\2027 Budget\Sewer\ Sewer UB Budget - 2027 FINAL.xlsx SS-3, Page 1 of 3 WAUPUN UTILITIES 2027 Budget - Sewer Sewer Usage - Actual 2021 through July 2026 and 2027 Budget 2021 2022 2023 2024 2025 2026 3 YR AVERAGE 2026 Budget 2027 Budget January 4,566 4,927 5,336 5,303 5,931 5,503 5,579 5,931 5,503 February 4,548 4,971 4,990 5,359 5,114 5,604 5,359 5,114 5,604 March 4,879 4,907 5,309 5,170 5,630 5,468 5,423 5,630 5,468 April 4,724 4,925 5,331 5,240 5,323 5,357 5,307 5,323 5,357 May 5,104 5,372 5,708 5,567 5,605 6,099 5,757 5,605 6,099 June 5,380 5,081 5,647 5,458 5,471 5,681 5,537 5,471 5,681 July 5,217 5,322 5,514 5,733 5,909 6,578 6,073 5,909 6,578 August 5,241 5,339 5,493 5,930 5,874 - 5,766 5,930 5,874 September 4,914 5,126 5,475 5,942 5,579 - 5,665 5,942 5,579 October 4,894 5,339 5,473 6,122 5,763 - 5,786 6,122 5,763 November 4,769 5,169 5,324 5,263 5,314 - 5,300 5,263 5,314 December 4,754 5,543 5,179 5,429 5,518 - 5,375 5,429 5 , 5 1 8 Totals 58,990 62,021 64,779 66,516 67,031 40,290 66,927 67,669 6 8 , 3 3 8 % Change 7.94% 5.14% 4.45% 2.68% 0.77% 27 Bud. Vs '25 Act 1.95% 2021 2022 2023 2024 2025 2026 3 YR AVERAGE 2026 Budget 2027 Budget January 202 291 284 410 454 664 509 454 664 February 173 223 277 420 436 1,046 634 436 1,046 March 263 304 355 419 457 871 582 457 871 April 226 302 324 435 483 955 624 483 955 May 255 356 370 434 563 907 635 563 907 June 259 378 485 353 484 916 584 484 916 July 188 243 417 377 500 918 598 500 918 August 259 298 525 383 435 - 448 383 435 September 304 329 452 391 520 - 454 391 520 October 314 351 617 399 532 - 516 399 532 November 219 302 482 383 563 - 476 383 563 December 242 286 383 317 725 - 475 317 7 2 5 Totals 2,904 3,663 4,971 4,721 6,152 6,277 6,536 5,250 9 , 0 5 2 % Change -26.01% 26.14% 35.71% -5.03% 30.31% 27 Bud. Vs '25 Act 47.14% COMMERCIAL INDUSTRIAL S:\Accounting\Budget\2027 Budget\Sewer\ Sewer UB Budget - 2027 FINAL.xlsx SS-3, Page 2 of 3 WAUPUN UTILITIES 2027 Budget - Sewer Sewer Usage - Actual 2021 through July 2026 and 2027 Budget 2021 2022 2023 2024 2025 2026 5 Yr Average 2026 Budget 2027 Budget January 17,913 13,280 19,270 19,405 18,798 20,428 18,236 17,733 18,236 February 17,704 13,958 19,207 19,670 18,179 20,207 18,244 17,744 18,244 March 16,652 12,005 19,183 23,456 17,847 17,490 17,996 17,829 17,996 April 17,513 16,099 21,120 20,645 20,608 22,055 20,105 19,197 20,105 May 17,424 15,342 20,014 20,078 19,974 20,565 19,195 18,566 19,195 June 18,236 18,012 21,395 21,492 18,944 20,007 19,970 19,616 19,970 July 18,138 17,914 20,409 24,292 18,114 20,056 20,157 19,773 20,157 August 18,869 18,634 21,145 20,805 18,110 - 19,513 20,357 19,513 September 17,943 18,521 21,132 19,390 18,181 - 19,033 19,519 19,033 October 17,035 17,622 19,579 17,581 18,516 - 18,067 18,305 18,067 November 15,647 18,759 19,879 18,374 17,780 - 18,088 18,526 18,088 December 13,838 18,331 19,499 18,175 18,304 - 17,629 17,840 1 7 , 6 2 9 Totals 206,912 198,477 241,832 243,363 223,355 140,808 226,233 225,003 226,233 % Change -25.11% -4.08% 21.84% 0.63% -8.22% 27 Bud. Vs '25 Act 1.29% PUBLIC AUTHORITY S:\Accounting\Budget\2027 Budget\Sewer\ Sewer UB Budget - 2027 FINAL.xlsx SS-3, Page 3 of 3 Waupun Utilities 2027 Budget - Sewer Expenses - Actual 2016 through Actual 2025 Account Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Number 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 820 Supervision and labor 91,697 $ 93,629 $ 98,361 $ 107,487$ 122,468$ 145,777$ 143,891$ 133,683$ 125,073$ 123,830$ 821 Power for pumping 138,941 143,564 134,856 129,997 128,442 117,187 152,566 235,989 294,880 376,247 823 Chemicals 76,548 90,073 121,338 129,033 84,168 97,094 130,475 213,743 105,693 173,834 827 Operating supplies 27,238 27,356 24,313 23,189 21,993 20,446 37,458 37,447 33,375 40,242 828 Laboratory labor 39,100 39,083 44,804 53,580 59,714 57,625 53,440 62,053 70,312 69,449 829 Laboratory supplies 13,037 15,040 19,983 22,361 20,245 22,224 18,177 30,851 48,890 39,915 Total Operating 386,561 408,745 443,655 465,647 437,030 460,353 536,007 713,766 678,223 823,517 831 Sewage collection system 148,395 142,483 137,857 125,032 125,032 138,748 156,735 149,839 165,869 152,933 832 Pumping equipment 2,815 2,478 6,064 5,090 3,783 8,123 8,350 9,823 11,052 6,488 833 Treatment plant equipment 181,839 184,767 216,064 164,379 152,730 400,867 154,026 157,926 174,098 226,666 834 General plant 107,375 96,977 79,296 104,992 128,485 97,548 128,558 177,181 212,830 162,212 Total Maintenance 440,424 426,705 439,281 399,493 410,030 645,286 447,669 494,769 563,849 548,299 840 Accounting and collecting 148,697 138,992 145,207 150,907 146,015 133,509 137,612 138,497 149,154 136,037 842 Meter reading 1,537 3,165 3,762 4,356 4,968 5,728 6,334 7,108 7,863 7,886 Total Customer Accounts 150,234 142,157 148,969 155,263 150,983 139,237 143,946 145,605 157,017 143,923 850 General office salaries 22,387 23,638 24,004 25,540 47,692 48,763 53,293 55,211 57,855 66,452 851 General office supplies 50,803 45,631 47,824 54,929 49,945 52,853 54,240 73,078 63,879 75,495 852 Outside services 33,025 41,208 81,316 45,021 74,991 55,054 43,521 37,409 75,460 91,568 853 Property insurance 25,762 29,816 24,406 28,025 30,264 34,954 34,207 41,286 60,404 58,620 854 Employee pensions and benefits 204,027 199,070 177,039 181,423 192,887 217,462 223,666 247,747 231,993 241,057 856 Miscellaneous general 19,550 21,199 26,706 45,434 36,245 34,871 32,594 35,177 72,167 56,105 Total Administrative and General 355,554 360,562 381,295 380,372 432,024 443,957 441,521 489,908 561,758 589,297 Total Operation and Maintenance 1,332,773 1,338,169 1,413,200 1,400,775 1,430,067 1,688,833 1,569,143 1,844,048 1,960,847 2,105,036 403 Depreciation 701,196 681,643 666,644 668,644 700,653 708,481 700,497 715,815 1,043,800 1,393,140 TOTAL OPERATING EXPENSES 2,033,969$ 2,019,812 $ 2,079,844 $ 2,069,419 $ 2,130,720 $ 2,397,314 $ 2,269,640 $ 2,559,863 $ 3,004,647 $ 3,498,176 $ Operating Expenses Maintenance Expenses Customer Accounts Expenses Administrative and General Expenses S:\Accounting\Budget\2027 Budget\Sewer\ Sewer UB Budget - 2027 FINAL.xlsx SS-4 Waupun Utilities 2027 Budget - Sewer Loadings - Forecasted 2027 2021 2022 2023 2024 2025 YTD 2026 BOD SS Phos BOD SS Phos BOD SS Phos BOD SS Phos BOD SS Phos BOD SS Phos January 4,723 2,121 - 10,551 28,858 103 15,257 29,873 113 14,121 26,223 87 6,201 7,085 11 4,542 11,401 9 February 5,497 3,594 - 13,545 26,714 198 11,447 22,393 109 7,949 15,550 20 5,696 14,831 39 5,506 11,530 6 March 4,533 4,767 - 5,936 12,789 18 7,794 18,811 50 7,561 17,827 64 4,763 7,437 11 8,041 16,235 17 April 3,298 4,464 1 9,876 25,654 168 12,427 18,973 78 7,290 15,941 72 5,358 15,892 50 5,799 22,662 44 May 6,424 8,085 - 8,971 22,095 117 20,107 29,619 247 10,940 33,016 103 6,550 22,628 37 8,618 24,528 19 June 9,795 13,126 10 8,835 14,368 - 11,497 14,748 24 6,328 16,456 11 10,812 19,172 68 5,508 15,727 8 July 9,256 16,139 15 6,685 23,198 7 7,013 9,305 9 6,987 18,588 41 7,948 18,915 49 10,178 20,966 69 August 9,065 11,543 24 11,854 25,577 167 7,857 16,909 9 5,723 19,023 23 13,293 23,541 23 - - - September 4,122 7,945 7 11,037 26,234 36 8,774 14,270 9 8,683 21,530 108 8,463 21,052 12 - - - October 6,476 10,900 4 6,751 19,857 8 9,915 15,424 16 6,294 24,044 15 8,974 21,465 57 - - - November 9,004 14,538 85 7,214 21,701 45 19,171 39,405 181 4,510 15,442 11 6,710 19,611 6 - - - December 13,221 29,572 213 23,347 31,052 244 21,315 39,189 280 4,685 7,773 36 6,952 16,046 7 - - - 85,414 126,794 359 124,602 278,097 1,111 152,574 268,919 1,125 91,071 231,413 591 91,720 207,675 370 48,192 123,049 172 Change from PY 45.88% 119.33% 209.47% 22.45% -3.30% 1.26% -40.31% -13.95% -47.47% 0.71% -10.26% -37.39% Average 2027 Forecasted BOD SS Phos BOD SS Phos Large customer shut-downs due to COVID January 9,233 17,594 54 4,542 11,401 9 Last 12 months February 8,273 15,769 62 5,506 11,530 6 Last 12 months Started Billing 6 commercial customers for loadings beginning April 2023 March 6,438 12,978 27 8,041 16,235 17 Last 12 months April 7,341 17,264 69 5,799 22,662 44 Last 12 months May 10,268 23,329 87 8,618 24,528 19 Last 12 months June 8,796 15,600 20 5,508 15,727 8 Last 12 months July 8,011 17,852 32 10,178 20,966 69 Last 12 months August 9,558 19,319 49 13,293 23,541 23 Last 12 months September 8,216 18,206 34 8,463 21,052 12 Last 12 months October 7,682 18,338 20 8,974 21,465 57 Last 12 months November 9,322 22,139 66 6,710 19,611 6 Last 12 months December 13,904 24,726 156 6,952 16,046 7 Last 12 months Total 107,043 223,113 676 92,584 224,764 277 Change from Last 12 months -13.51% 0.74% -59.00% S:\Accounting\Budget\2027 Budget\Sewer\ Sewer UB Budget - 2027 FINAL.xlsx SS-5 WAUPUN UTILITIES 2027 Budget Appendices This budget package includes three appendices. A review and description of each follows. Appendix A – Equipment Replacement Schedule This schedule provides a listing of all Waupun Utilities transportation and power- operated equipment, its original cost, recommended replacement year, and forecasted replacement cost. Appendix B – Projected Debt Service Schedules These schedules provide a projected debt service summary including the 2019 Refunding Electric and Water Revenue Bonds, 2019 Electric and Water Refunding Revenue Bonds, the Sewer Utility 2020/2021 USDA Sewer Revenue Bonds and the anticipated 2026 Electric and Water Revenue Bonds with a debt service graph. Appendix C - Cash Position Summary These schedules provide a summary of unrestricted cash and investments from January 2016 through September 2026 and the equivalent months of operation and maintenance expenses as of September 2026. Cash set aside for restricted or designed purposes such as debt service and equipment replacement funding is NOT included in this historical summary. Appendix D – Five-Year Capital Plan – Electric, Water & Sewer Utilities These schedules provide a capital planning forecast for each utility from 2027 to 2031. Waupun Utilities Vehicle Replacement Schedule Forecasted Replacement Cost/Year As of September 30, 2026 Unit # Description Year Original Cost Useful Life 2027 2028 2029 2030 20 31 2032-2036 Total 1 Chevrolet Equinox 2019 21,359 $ 10 - - - - 34,800 69,600 3 Chevrolet 2500 Pickup 2017 32,068 10 - - - 43,100 - - 43,100 5 Caterpiller Tractor / Backhoe (2024) 2024 176,000 10 - - - - - 218,800 218,800 6 Chev Silverado 2500 2017 35,000 10 - - - - - 50,000 50,000 10 Mack Tandem Dump 2003 32,500 20 - - 180,000 - - - 180,000 11 Chevrolet 1500 Pickup 2019 27,036 10 - - - - - 44,000 44,000 12 Kabota UTV w/ blower attachments 2021 28,501 10 - - - - 46,400 92,800 14 Trencher 1989 26,903 25 - - - - - - - 15 John Deere Mower/Snowblower 2014 25,245 10 - - - - - 41,100 41,100 16B Forklift - LIUGONG 2026 36,700 15 - - - - - - - 17 Chevrolet 1500 Pickup 2019 27,036 10 - - - - - 44,000 44,000 18 Chevrolet 2500 Pickup 2016 35,884 10 - - - - 44,600 89,200 19 SCAG Zero Turn Lawnmower 2021 10,400 8 - 14,700 - - - 14,700 23 Vactor 2100i 2021 430,000 15 - - - - - 669,900 669,900 22 Valve Turner 2020 33,086 20 - - - - - - - 25 Altec Backyard Machine 2020 81,730 12 - - - - 160,000 160,000 320,000 25A Trailer for Altec Backyard Machine 2020 10,214 12 - - - - - - - 27 New Holland Backhoe (2018 Used) 2021 83,500 20 - - - - - 150,800 150,800 28 Sterling Dump Truck 2004 75,283 20 - - - - - 136,000 136,000 33 Caterpillar Backhoe 2003 93,400 20 - - - - - - - 147 GMC Pickup 2500 2007 27,254 n/a - - - - - - - 149 GMC Pickup - Small Dump 2007 47,718 15 85,000 - - - - - 85,000 150 International Line Truck 2009 178,888 20 - - - - - 400,000 400,000 152 Woods Puller-Tensioner 2012 40,850 15 - - - - - - - 154 Chevrolet Colorado Pickup 2012 16,132 10 - - - - - - - 155 Chevrolet Silverado Pickup 2012 18,938 15 - - 36,500 - - - 36,500 156 Ford F550 Altec Bucket Truck 2017 139,900 8 - 280,000 - - - - 280,000 157 Altec Bucket Truck - 60' 2025 321,333 20 - - - - - - - 165 Fork Lift (WWTP) 2024 33,100 10 - - - - - 44,500 44,500 166 Scissors Lift (WWTP) 2024 15,028 10 - - - - - 20,200 20,200 170 Chevrolet Silverado Pickup - 1/2 Ton 2026 45,659 10 - - - - - - - 171 Chevy Silverado 2500 Utility-Body Service Tr u 2026 70,354 10 - - - - - - - 172 Chevy Silverado 2500 Utility-Body Service Tr u 2026 70,364 10 - - - - - - - 173 Chevy Pick-Up - 1/2 Ton (Replaces #146) 2027 45,000 10 45,000 - - - - - 45,000 2,443,129$ 130,000 $ 280,000 $ 231,200 $ 43,100 $ 160,000 $ 2,105,100$ 3,075,200 $ NOTES: Appendix A Waupun Utilities Long-Term Debt Total Debt Service from 2027 through 2061 ESTIMATE D Date Electric Water Sewer Total 2027 292,638.89 896,960.58 1,189,599.47 2028 569,375.00 896,830.08 1,466,205.08 2029 572,750.00 896,819.20 1,469,569.20 2030 570,500.00 896,826.20 1,467,326.20 2031 572,625.00 896,651.08 1,469,276.08 2032 569,125.00 896,593.27 1,465,718.27 2033 570,000.00 896,551.02 1,466,551.02 2034 570,125.00 896,722.01 1,466,847.01 2035 569,500.00 896,506.26 1,466,006.26 2036 573,000.00 896,404.39 1,469,404.39 2037 570,625.00 896,414.07 1,467,039.07 2038 572,375.00 896,334.13 1,468,709.13 2039 568,250.00 896,264.01 1,464,514.01 2040 568,250.00 896,202.57 1,464,452.57 2041 572,125.00 896,248.06 1,468,373.06 2042 569,875.00 896,199.31 1,466,074.31 2043 571,500.00 896,255.19 1,467,755.19 2044 571,875.00 896,115.13 1,467,990.13 2045 571,000.00 896,078.57 1,467,078.57 2046 568,875.00 895,944.38 1,464,819.38 2047 896,010.83 896,010.83 2048 895,876.71 895,876.71 2049 895,940.88 895,940.88 2050 895,702.81 895,702.81 2051 895,761.32 895,761.32 2052 895,813.52 895,813.52 2053 895,659.39 895,659.39 2054 895,598.38 895,598.38 2055 895,528.82 895,528.82 2056 895,548.94 895,548.94 2057 895,457.57 895,457.57 2058 895,354.13 895,354.13 2059 895,237.50 895,237.50 2060 - - 895,305.38 895,305.38 2061 - - 161,805.00 161,805.00 Total 11,134,388.89$ - $ 30,629,520.69$ 41,763,909.58$ Appendix B  $‐  $200,000  $400,000  $600,000  $800,000  $1,000,000  $1,200,000  $1,400,000  $1,600,000 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 Year Waupun Utilities ‐ Annual Debt Service  2027 through 2037 Electric Water Sewer Total Waupun Utilities Cash and Investment Position January 2020 through September 2026 Cash Position: Month Electric Water Sewer Total Jan-20 1,881,997 911,351 1, 591,637 4, 384,985 Feb-20 1,912,396 766,389 1, 470,117 4, 148,901 Mar-20 1,771,562 904,428 1, 347,843 4, 023,833 Apr-20 1,912,385 1, 118,359 1, 264,129 4, 294,873 May-20 1,915,748 1, 183,623 1, 041,175 4, 140,546 Jun-20 1,975,371 1, 229,059 996,026 4, 200,456 Jul-20 1,932,888 1, 279,648 845,325 4, 057,861 Aug-20 1,915,325 1, 329,101 833,464 4, 077,890 Sep-20 1,969,824 1, 423,810 2, 626,495 6, 020,129 Oct-20 2,064,412 1, 487,482 2, 629,138 6, 181,033 Nov-20 2,078,055 1, 555,612 2, 638,713 6, 272,380 Dec-20 2,294,257 1, 621,374 2, 529,614 6, 445,244 Jan-21 2,342,428 1, 670,412 2, 492,723 6, 505,563 Feb-21 2,342,026 1, 734,296 2, 420,244 6, 496,566 Mar-21 2,378,999 1, 636,765 2, 253,670 6, 269,434 Apr-21 2,476,001 1, 723,929 2, 383,263 6, 583,192 May-21 2,581,726 1, 774,615 2, 272,886 6, 629,227 Jun-21 2,630,733 1, 914,883 2, 253,851 6, 799,467 Jul-21 2,583,405 1, 932,615 2, 307,910 6, 823,930 Aug-21 2,446,386 1, 942,714 2, 004,810 6, 393,910 Sep-21 2,573,880 1, 752,173 1, 760,853 6, 086,906 Oct-21 2,664,349 1, 797,392 1, 712,964 6, 174,705 Nov-21 2,710,623 1, 841,951 1, 425,916 5, 978,491 Dec-21 2,720,911 1, 845,476 1, 342,096 5, 908,482 Jan-22 2,886,466 1, 875,383 1, 321,537 6, 083,386 Feb-22 2,966,744 1, 942,863 1, 272,838 6, 182,445 Mar-22 3,063,988 2, 012,692 1, 279,922 6, 356,602 Apr-22 3,102,237 2, 104,760 1, 227,508 6, 434,505 May-22 3,108,032 2, 127,528 1, 118,279 6, 353,839 Jun-22 3,057,244 2, 229,558 1, 332,870 6, 619,671 Jul-22 3,092,505 2, 283,508 1, 082,218 6, 458,231 Aug-22 2,933,461 2, 121,389 892,175 5, 947,025 Sep-22 3,116,724 1, 987,329 790,640 5, 894,693 Oct-22 3,192,110 2, 000,073 721,740 5, 913,922 Nov-22 3,331,233 1, 808,250 772,977 5, 912,459 Dec-22 3,291,440 1, 887,433 774,805 5, 953,678 Jan-23 3,291,364 1, 946,547 720,792 5, 958,703 Feb-23 3,324,257 2, 012,159 923,000 6, 259,417 Mar-23 3,326,370 2, 085,798 908,839 6, 321,007 Apr-23 3,360,734 2, 151,026 904,211 6, 415,972 May-23 3,321,757 2, 233,609 865,708 6, 421,074 Jun-23 3,188,060 2, 323,132 939,843 6, 451,035 Jul-23 3,841,652 2, 409,040 1, 025,481 7, 276,174 Aug-23 3,655,033 2, 479,718 1, 089,620 7, 224,372 Sep-23 3,907,310 2, 534,894 1, 118,332 7, 560,536 Oct-23 3,908,479 2, 620,051 1, 094,142 7, 622,673 Nov-23 4,030,162 2, 712,554 1, 144,417 7, 887,133 Dec-23 4,081,125 2, 841,540 1, 194,611 8, 117,276 Appendix C Page 1 of 2 Waupun Utilities Cash and Investment Position January 2020 through September 2026 Cash Position: Month Electric Water Sewer Total Jan-24 4,054,961 2, 892,656 1, 087,297 8, 034,914 Feb-24 4,014,265 2, 991,811 1, 284,613 8, 290,688 Mar-24 4,120,557 2, 914,545 1, 177,366 8, 212,468 Apr-24 4,287,848 2, 876,420 1, 189,162 8, 353,430 May-24 4,260,627 2, 958,010 1, 231,786 8, 450,423 Jun-24 4,248,648 3, 053,455 1, 258,974 8, 561,076 Jul-24 4,215,915 3, 128,204 1, 192,900 8, 537,019 Aug-24 4,331,395 3, 097,649 1, 163,675 8, 592,719 Sep-24 4,500,852 3, 146,027 1, 385,277 9, 032,157 Oct-24 4,493,809 3, 241,372 1, 382,071 9, 117,251 Nov-24 4,487,261 3, 314,698 1, 458,828 9, 260,788 Dec-24 4,463,764 3, 367,110 1, 455,820 9, 286,693 Jan-25 4,537,193 3, 377,336 1, 342,884 9, 257,412 Feb-25 4,633,497 3, 456,010 1, 363,738 9, 453,245 Mar-25 4,822,133 3, 500,817 1, 356,382 9, 679,331 Apr-25 4,891,893 3, 588,791 1, 420,790 9, 901,474 May-25 4,753,764 3, 626,368 1, 462,311 9, 842,443 Jun-25 4,893,475 3, 738,641 1, 321,654 9, 953,770 Jul-25 4,586,545 3, 445,373 1, 237,728 9, 269,646 Aug-25 4,573,686 3, 436,237 1, 270,063 9, 279,986 Sep-25 4,774,042 3, 498,044 1, 242,126 9, 514,212 Oct-25 4,722,581 3, 587,288 1, 419,038 9, 728,907 Nov-25 4,721,591 3, 621,383 1, 503,582 9, 846,556 Dec-25 5,059,789 3, 600,974 1, 654,985 10,315,748 Jan-26 5,060,681 3, 579,944 1, 564,352 10,204,978 Feb-26 5,105,495 3, 611,729 1, 620,850 10,338,074 Mar-26 5,293,405 3, 650,595 1, 729,774 10,673,774 Apr-26 5,289,520 3, 730,168 1, 833,598 10,853,285 May-26 5,363,300 3, 784,859 1, 880,472 11,028,631 Jun-26 5,378,693 3, 809,974 1, 931,736 11,120,403 Jul-26 5,424,286 3, 891,571 2, 011,436 11,327,293 Aug-26 5,464,902 3, 808,810 2, 160,236 11,433,948 Sep-26 5,286,066 3, 628,170 2, 047,454 10,961,690 Months of O&M + Taxes (2027 Budget) 5.15 24.93 10.48 6 . 6 0 GOAL = 3 - 6 Months S:\Accounting\Budget\2027 Budget\Appendices\ Cash Position - Jan 20 thru Sept 26.xlsx Appendix C Page 2 of 2 Appendix C Page 2 of 2  $‐  $500,000  $1,000,000  $1,500,000  $2,000,000  $2,500,000  $3,000,000  $3,500,000  $4,000,000  $4,500,000  $5,000,000  $5,500,000  $6,000,000  $6,500,000  $7,000,000  $7,500,000  $8,000,000  $8,500,000  $9,000,000  $9,500,000  $10,000,000  $10,500,000  $11,000,000  $11,500,000  $12,000,000  $12,500,000 Jan‐20 Mar‐20 May‐20 Jul‐20 Sep‐20 Nov‐20 Jan‐21 Mar‐21 May‐21 Jul‐21 Sep‐21 Nov‐21 Jan‐22 Mar‐22 May‐22 Jul‐22 Sep‐22 Nov‐22 Jan‐23

Text truncated. Open the original for the full document.

Source: City of Waupun website. First collected Nov 8, 2026.