PORTAGE COUNTY
MEETING AGENDA
HIGHWAY COMMITTEE
PORTAGE COUNTY ANNEX
CONFERENCE ROOM 5
1462 STRONGS AVENUE
STEVENS POINT, WI 54481
Tuesday, August 18, 2026 3:30 PM
REMOTE ATTENDANCE & COMMENT
To attend this meeting by telephone : dial 1-872-242-7813, after dialing the number you will then be asked to enter in a
meeting number. Use the following meeting number: 510 292 667, then press #
To attend this meeting by video: Join the Meeting Now
Page 1 of 2
CALL TO ORDER
Committee Members enter Per Diem and Mileage
CORRESPONDENCE
1. National Association of County Engineers Executive Committee Update
2. WisDOT Letter regarding WIS 22 Pavement Resurfacing Project Schedule Update
3. WisDOT Letter regarding CTH A Local Small Structure Improvement Program application
4. WisDOT Letter regarding CTH E Local Small Structure Improvement Program application
PRESENTATIONS
REPORTS
5. Special Meeting Attendance Reports (Portage County Ordinance 3.1.47 & 3.1.48)
6. Commissioner’s Report
PUBLIC NOTICE
Members of the public who wish to address the Committee on specific agenda items must register their request at this time,
with such comments subject to the public comment ordinance and the reasonable control of the Committee Chair as set forth
in Robert’s Rules of Order.
APPROVAL OF MINUTES
7. Approval of July 21,2026 Minutes
DISCUSSION/POSSIBLE ACTION
8. Discussion and Possible Action on Resolution Revising and Updating Portage County Ordinance 2.13.1 Establishment
of Speed Zones
9. Discussion and Possible Action on 2026-19PC Bid – Curb & Gutter, Concrete Surface Drain Project
10. Discussion and Possible Action on 2026-21PC Bid – Quad Axle Body Build
11. Discussion and Possible Action on 2026-22PC – Snow and Ice Equipment Installation
12. Discussion and Possible Action on 2027 Equipment Purchase – Snow and Ice Equipment
Page 1 of 44
Highway Committee Meeting Agenda August 18, 2026
Page 2 of 2
13. Discussion and Possible Action on Resolution to Portage County Ordinance Chapter 2 Public Peace and Order,
Section 2.28 Regulation of Boating Upon Bear Creek
14. Discussion and Possible Action on CTH R (STH 54 to CTH B) Relocation Order and Plat
15. Discussion on 2027 Highway Department Budgets
NEXT MEETING DATE
ADJOURNMENT
Notice: Any person who has special needs and plans on attending this meeting in-person or remotely should contact the Facilities at 715-
346-1598 as soon as possible to ensure that reasonable accommodations can be made.
Notice: Remote comment by the public during the meeting will be at the discretion of the Chair.
Notice: A quorum of the Portage County Board of Supervisors, or any committee thereof, may be present at this meeting.
Page 2 of 44
1
Check, Nathan
From: Dan Ketelsen <dketelsen@countyengineers.org>
Sent: Monday, July 27, 2026 9:17 AM
To: Check, Nathan
Subject: NACE News - July 2026 Edition - V2
Caution! This message was sent from outside your organization.
Due to a formatting issue, July NACE News is
being reissued. We're sorry for the
inconvenience.
NACE Executive Committee Update
By: Matt Machado, PE, LS, NACE Secretary / Treasurer,
Deputy CEO, Director of Community Development &
Infrastructure, Santa Cruz County, CA
The History of Fuel Taxes—and What It Means for Cou nties
For counties across the country, maintaining local roads and
bridges isn’t optional—it’s essential to public saf ety, economic
vitality, and day-to-day mobility. Counties maintain more than
40% of the nation’s roads and bridges, often while managing
substantial deferred maintenance.
That’s why understanding the history of federal and state fuel
taxes is so important for county engineers and transportation
leaders. The fuel-tax model helped build America’s highway
Page 3 of 44
2
system—but its design also created predictable fund ing
challenges over time, especially as inflation and vehicle
efficiency changed what “per-gallon” revenue can co ver.
Federal fuel taxes: A system that hasn’t kept pace with inflation.
The first federal gasoline tax was created on June 6,
1932 through the Revenue Act of 1932, starting at 1 cent per
gallon during the Great Depression.
Key federal milestones include:
• 1932 – 1 cent (President Herbert Hoover): emergency
budget balancing
• 1956 – 3.1 cent increase (President Dwight Eisenhow er):
helped finance the Interstate era
• 1983 – 5 cent increase (President Ronald Reagan):
aimed at repairing national transportation assets
• 1990 – 5 cent increase (President George H.W. Bush) :
included deficit reduction/infrastructure funding
• 1993 – 4.3 cent increase (President Bill Clinton):
dedicated infrastructure funding response
The core issue is that the federal gas tax is not indexed to
inflation. Since 1993, it has lost roughly 60% of its purchasing
power—meaning the revenue counties rely on for syst em
preservation buys far less today than it did decades ago.
To match the purchasing power of 1993, the fuel tax would need
to be over $0.50 per gallon rather than the current rate of $0.184
per gallon.
State fuel taxes: growth, then “funding drift” with time.
Fuel taxes spread quickly at the state level in the early 20th
century. By the 1930s, states were already collecting meaningful
per-gallon revenue to support highways.
Page 4 of 44
3
However, as with the federal tax, many state fuel tax structures
struggled to keep pace with:
• rising construction and maintenance costs
• changing vehicle fuel economy
shifting vehicle technology (including electrification)
California as a case study: how counties feel the impacts
California’s fuel-tax evolution illustrates what happens when
revenue mechanisms lag behind real costs—and how ta rgeted
policy changes can help, but not solve everything.
Key California milestones
• 1923: first state gas tax at 2 cents per gallon
• 1940s–1980s: incremental increases as the highway
system expanded (reaching 9 cents by 1983)
• 1990s: hikes pushed the rate to 18 cents by 1994 for
more than a decade
• 2010 “Fuel Tax Swap”: reduced the sales tax portion on
gasoline while shifting toward a variable excise structure
• 2017 SB 1 (Road Repair and Accountability Act): added
a 12-cent increase and introduced annual inflation
adjustments
Today’s result (and its significance)
California’s state excise tax is now 63.4 cents per gallon —
the highest in the nation.
This matters for county engineers because when state revenue
is stable, counties can better plan capital projects and lifecycle
maintenance. When it isn’t, deferred maintenance grows—and
that creates cascading costs for local jurisdictions.
Fuel taxes aren’t the only charges counties consider—but they’re
foundational.
Page 5 of 44
4
California’s roadway maintenance funding is transitioning from
traditional, gas-tax-based revenues to user-based models and
targeted state investments. The future relies on inflation-adjusted
fuel taxes, localized sales tax measures, expanded Zero-
Emission Vehicle (ZEV) fees, and pilot programs aimed at
replacing gas taxes with a permanent Road Charge. Because
electric vehicles do not pay gas taxes, California enforces annual
registration surcharges (up to $165 depending on the vehicle) to
ensure drivers contribute to infrastructure wear and
tear. California has moved past pilot phases toward evaluating a
permanent statewide Road Charge system. This would tax
drivers based on vehicle miles traveled (VMT) rather than fuel
consumed, protecting the revenue stream as gas-powered cars
are phased out, or as fuel efficient cars continue to improve.
And for counties—especially those not capturing the same
revenue streams as the state or federal government—
predictable transportation funding is directly tied to asset
condition, staffing, and delivery capacity.
A reliable funding system must match today’s realities. Whether
the question is pavement preservation cycles, bridge deck
rehabilitation, storm-related drainage improvements, or ADA and
safety upgrades, counties face the same challenge:
The per-gallon fuel tax model has lagged (historically) behind:
• inflation and construction cost escalation
• changes in fuel consumption (efficiency, market shifts)
• evolving vehicle technology and future revenue risk
Counties need to band together to support solutions that help
local governments:
• maintain transportation assets in a state of good repair
• plan multi-year capital programs confidently
Page 6 of 44
5
• protect public safety without forcing constant emergency
repairs
Updating the system is a county infrastructure issue. The history
of federal and state fuel taxes shows why today’s funding can fall
short — especially when revenue mechanisms don’t
automatically respond to inflation and evolving travel patterns.
To meet county infrastructure needs, the funding system must
better align with the lifecycle realities of roads and bridges.
NACE Updates
NACE President Pam Dingman presents the NACE Update at the National
Association of Counties Annual Conference in New Orleans.
NACE Communties
Page 7 of 44
Page 8 of 44
Page 9 of 44
July 31, 2026
Nathan Check
County of Portage
800 Plover Road
Plover, WI 54467
RE: LSSIP Application – Structure V490134
Dear Nathan Check:
Thank you for your interest in the Wisconsin Department of Transportation (WisDOT) Local Small
Structure Improvement Program (LSSIP). Project applications were reviewed and ranked according
to the LSSIP Guidelines prior to making final recommendations to the WisDOT Secretary. At this time,
your proposed project for V490134 has not been approved to receive funding.
The application process for the new LSSIP program was highly competitive. WisDOT initially received
430 eligible applications for statewide considerati on, for a total state share request of $
133.7 million
in LSSIP funds. Ultimately, WisDOT was able to award 101 projects and approximately $30 million in
LSSIP state share funding this program cycle.
We encourage your community to maintain the interest and momentum that led to your LSSIP
application submission. WisDOT remains committed to building relationships with external
stakeholders to improve Wisconsin’s transportation infrastructure, and the Department encourages all
eligible applicants to apply for available funding under existing local aid programs.
If you have further questions regarding LSSIP, please contact the LSSIP Program Manager, Izzy
Schultze, at (608) 267-6843 or email izzy.schultze@dot.wi.gov.
Sincerely,
Izzy Schultze
WisDOT LSSIP Statewide Program Manager
Wisconsin Department of Transportation
Off
ice of the Administrator
Division of Transportation Investment Management
4822 Madison Yards Way, S603
Madison, WI 53705
Justin Shell, Administrator
Angela Adams, Deputy Administrator
wisconsindot.gov
Telephone: (608) 266-0255
Email: DOTDTIMAO@dot.wi.gov
Page 10 of 44
July 31, 2026
Nathan Check
County of Portage
800 Plover Road
Plover, WI 54467
RE: LSSIP Application – Structure V490122
Dear Nathan Check:
Thank you for your interest in the Wisconsin Department of Transportation (WisDOT) Local Small
Structure Improvement Program (LSSIP). Project applications were reviewed and ranked according
to the LSSIP Guidelines prior to making final recommendations to the WisDOT Secretary. At this time,
your proposed project for V490122 has not been approved to receive funding.
The application process for the new LSSIP program was highly competitive. WisDOT initially received
430 eligible applications for statewide considerati on, for a total state share request of $
133.7 million
in LSSIP funds. Ultimately, WisDOT was able to award 101 projects and approximately $30 million in
LSSIP state share funding this program cycle.
We encourage your community to maintain the interest and momentum that led to your LSSIP
application submission. WisDOT remains committed to building relationships with external
stakeholders to improve Wisconsin’s transportation infrastructure, and the Department encourages all
eligible applicants to apply for available funding under existing local aid programs.
If you have further questions regarding LSSIP, please contact the LSSIP Program Manager, Izzy
Schultze, at (608) 267-6843 or email izzy.schultze@dot.wi.gov.
Sincerely,
Izzy Schultze
WisDOT LSSIP Statewide Program Manager
Wisconsin Department of Transportation
Off
ice of the Administrator
Division of Transportation Investment Management
4822 Madison Yards Way, S603
Madison, WI 53705
Justin Shell, Administrator
Angela Adams, Deputy Administrator
wisconsindot.gov
Telephone: (608) 266-0255
Email: DOTDTIMAO@dot.wi.gov
Page 11 of 44
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
Date: August 12, 2026
To: Highway Committee
From: Nathan Check, P.E.
Subject: Commissioner’s Report
Please see below for a number of Highway Department Updates.
Staffing – All full-time positions are filled. A c ivil technician candidate accepted an offer and
took the pre-employment testing but was a no-call, no-show during his first scheduled day of
work. We have not had any other seasonal laborer applicants as of the past two months.
Training – Three to four supervisors and foreman will be att ending the WCHA Leadership
Development conference in October. Also, please mark your calendar for our annual Roadeo
Training event which will be held on October 20 th . Committee members are welcome to attend
for all or part of the day.
Operations – The second round of mowing on the County system is nearly complete. State
crews have been assisting on our bridge maintenance list for cleaning, concrete repairs, and crack
sealing.
The CTH D project continues to progress with the lower layer of paving complete for the first
phase. The second phase has been pulverized and spot grading areas are nearly complete. The
one parcel acquisition is completed and the large culvert installation is scheduled for the end of
August/beginning of August. All chispealed roads are swept and centerline is painted.
County crews also completed the Town of Dewey culvert aid project on Park Road this past
month.
Budget – Below is the 2026 budget analysis through July 18, 2026.
Winter maintenance is at 60% of the overall budget which is tracking lower than last year and is
still in the typical range for this time of year.
General maintenance is at 60% of the overall budget which is tracking approximately 10%
higher than typical. This is primarily due to the additional ice storm clean-up. Staff has
provided all Highway data to Emergency Management and Finance for their submittal to the
Wisconsin Disaster Fund to attempt to be reimbursed for a portion of those costs.
Page 12 of 44
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
Construction – Through last week, the CTH D constru ction costs were under $983k which is
tracking under budget for the progress made. Paving costs are averaging approximately $65/ton
which is under our Highway Department estimate of $70/ton. The final asphalt surface and
shouldering of the first phase is scheduled to be completed in the next two weeks. Paving of the
lower layer for Phase 2 is also scheduled in the next two weeks.
Chipsealing – All major costs are entered for the c hipsealing season and are approximately
$1.03M which is $120k under budget.
The Machinery Operation budget is still tracking with higher revenues resulting in a current
surplus of $236k.
Below is a summary of the net surplus/loss through the year.
January + $15k July +$236k
February +$261k
March +$233k
April +$333k
May +$280k
June +$242k
The DOT Routine Maintenance Agreement is tracking within 5% of the budgeted costs for
winter and general maintenance activities. The overall budget is tracking higher as our January
invoice includes our billing for radio, storage reimbursement, and winter readiness charges.
Projects
-Safe Streets for All(SS4A) Grant – The Portage Cou nty Bicycle and Pedestrian Plan and
Comprehensive Safety Action Plan are on the next County Board meeting for adoption.
-WisDOT Structure 6’-20’ Program – Please refer to the letters in correspondence.
Unfortunately, the CTH E structure of the Wisconsin River and the CTH A structure over Spring
Creek were not selected for funding. Future funding of the program is unknown until the next
state budget. Staff is evaluating options of other funding sources.
-CTH R(STH 54 to CTH B) –The Design Study Report i s completed and accepted by the
consultant. The final plat and relocation order is scheduled for committee action at this meeting.
Construction is scheduled for 2028 for this project as part of the WisDOT STP-Urban Program.
-CTH II Bear Creek Bridge – Final design has been submitted to WisDOT for review and has
been accepted. The proposed dual culverts will be replaced with a slab span bridge which will
Page 13 of 44
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
increase the capacity and allow us to fully remove and eliminate the two failing smaller culverts
to the south. WisDOT and WDNR have reviewed and concurred with this option . Construction
is set for 2027 for this project with is part of the WisDOT STP-Bridge Program. There is a
resolution for a boating restriction ordinance on this meeting’s agenda for consideration.
-CTH HH and Hoover Development – A preconstruction meeting was held by the Contractor
with planned work within the CTH HH right-of-way scheduled for later this fall.
-Highway Addition and Renovation – No updates. The project is still waiting final close-out and
payment to Miron as there are some HVAC issues still unresolved.
-WCHA Updates – The WCHA Executive Committee contin ues to work on a number of
WisDOT issues which include management of the STP-Rural project awards, Trans 206 re-
write(this is the LRIP administrative code), Trans 276 policy updates(oversize/overweight
regulations), and the future of the Local Small Structure Inspection and future funding options.
In addition, the WisDOT has forwarded a formal 13.10 state budget request to ask the state
legislature for additional funding due to the severe winter and spring weather.
-WisDOT Surface Transportation Program 2026-2031 Cycle –No new updates. Staff has applied
for STP-Rural funding for CTH A(STH 161 to CTH Z) roadway and Local Bridge funding CTH
O bridge rehabilitation. WisDOT’s initial plan was to release project selections in the Spring but
they have delayed this notice until late Summer.
New Updates
-WisDOT Construction Projects – WisDOT has multiple construction projects starting this
spring. Additional information will be posted to their website:
https://projects.511wi.gov/region/north-central/
-WIS 13 (2nd Street North to County P) - Wood and Portage counties – Pavement
replacement project with full closure and detour.
-WIS 54 (26 Street to County B) - Wood and Portage counties – Concrete joint repair
project with single lane closures.
-Standing Rocks Road(Custer Rd to Townline Rd, Town of Stockton) -Reconditioning
project funded under STP-Local. Road closed to through traffic with access to the park
maintained.
-Request for Proposals(RFP) – CTH A(CTH Z to STH 66 ) – Staff has worked with
Purchasing to issue a RFP for the design of this STP-Rural project which is scheduled for
construction in 2029.
Page 14 of 44
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
-2027 Bridge Culvert Aid – Notices and applications to the Towns have been sent out last
month for consideration in the 2027 budget. Applications are due August 21 st .
-McDill Dam Fence – There has been communication over the past year regarding the fence
along the McDill dam and CTH HH sidewalk in the Village of Whiting between the McDill Lake
District, City of Stevens Point, Village of Whiting, and the Highway Department. There are
sections of fence missing and others in need of repair. Based on the Highway Department’s and
Corp Counsel’s review of the past agreements, we do not believe that the fence is in the County’s
responsibility. Staff has sent a letter to all parties and requested a meeting. The Lake District
representative has asked that the meeting be deferred until a new representative is elected for
their group.
-CTH HH/Bremmer Street Intersection – Due to concerns from the increased traffic being
rerouted due to the Bus 51 project, staff has received calls from the owner and a tenant for the
office building along Bremmer Street at the McDill Pond. This intersection was analyzed
previously due to sight distance concerns and the intersection was ultimately converted to a
Right Turn only intersection. There are increased concerns with speed which staff has forwarded
onto the Sheriff’s office and also gather speed data for the area. The date was collected for both
weekday and weekend traffic and we found decent compliance with the posted speed limit with
an 85th percentile speed of under 39 mph(means that 85% of traffic is going under 39 mph) and
the average speed of just over 35 mph. The department also updated the additional flagging over
the intersection warning sign. More discussions are likely as we continue to evaluate the
intersection.
-Next Meeting Date – The next regularly scheduled meeting would be September 15
th .
If you have any questions on any of the items, please feel free to call or email.
Thank you.
Attachments: None
Page 15 of 44
PORTAGE COUNTY
MEETING MINUTES
HIGHWAY COMMITTEE
PORTAGE COUNTY ANNEX
CONFERENCE ROOMS 1 & 2
1462 STRONGS AVENUE
STEVENS POINT, WI 54481
Tuesday, July 21, 2026 3:30 PM
REMOTE ATTENDANCE & COMMENT
To attend this meeting by telephone : dial 1-872-242-7813, after dialing the number you will then be asked to enter in a
meeting number. Use the following meeting number: 694 554 049, then press #
To attend this meeting by video: Join the meeting now
Page 1 of 2
CALL TO ORDER
Committee Members enter Per Diem and Mileage
The Highway Committee was called to order by Member M. Jacowski at 3:30 p.m.
Members Present: Vice Chair S. Cieslewicz (remote), Member M. Jacowski, Member S. Potocki, Member S. Fritz
Members Excused: Chair D. Ladick
Others Attending: Nathan Check, Kristen Hancock, Corey Giese, Lucas Meddaugh, Anthony Dallman, Dorothy Czysen, Jim Czysen,
Leonard Hintz, Dave Wilz, Lori Shroda, Maurice King, Paul Cieslewicz
CORRESPONDENCE
1. National Association of Counties Transportation Funding Brief
Update Only
2. US Army Corp of Engineers Stream Credit Release Letter
Update Only
PRESENTATIONS
REPORTS
3. Special Meeting Attendance Reports (Portage County Ordinance 3.1.47 & 3.1.48)
4. Commissioner’s Report
Update Only
PUBLIC NOTICE
Members of the public who wish to address the Committee on specific agenda items must register their request at this time,
with such comments subject to the public comment ordinance and the reasonable control of the Committee Chair as set forth
in Robert’s Rules of Order.
APPROVAL OF MINUTES
5. Approval of May 19, 2026 Minutes
A motion was made by Member S. Potocki, seconded by Member S. Fritz to approve the May 19, 2026 Minutes. Motion carried by
unanimous vote.
DISCUSSION/POSSIBLE ACTION
6. Discussion and Possible Action on CTH Y(STH 66 to Dewey Drive) Preliminary Speed Study Results
Page 16 of 44
Highway Committee Meeting Minutes July 21, 2026
Page 2 of 2
A motion was made by Member S. Fritz, seconded by Member S. Potocki to extend the 45-mph speed limit north to a point 1,200 feet
north of Sharonwood Lane. Motion carried by unanimous vote.
7. Discussion and Possible Action on CTH KK(Timberline Road to CTH A) Preliminary Speed Study Results
A motion was made by Vice Chair S. Cieslewicz, seconded by Member S. Fritz to:
• Adjust the 55-mph speed zone southern limit, to end at a point 480 feet north of Timberline Court
• Establish a 45-mph speed zone from a point 480 feet north of Timberline Court to a point 575 feet north of the CTH B / Western
Way / Wilson Street Intersection
• Retain the existing 35-mph zone through the intersection with CTH B / Western Way / Wilson Street
• Establish a 45-mph zone from a point beginning 1,020ft south of the intersection with CTH B / Western Way / Wilson Street to the
intersection with CTH A
Motion carried by unanimous vote.
8. Discussion and Possible Action on Rumble Strip Installation on CTH N east of CTH BB, Town of Buena Vista
No Action Taken
9. Discussion and Possible Action on CTH E(CTH HH – Dam Road) Project Budget Amendment Request
A motion was made by Member S. Fritz, seconded by Member S. Potocki to approve the CTH E(CTH HH – Dam Road) Project
Budget Amendment Request. Motion carried by unanimous vote.
10. Discussion and Possible Action on Contract with Terra Ventures for Professional Real Estate Services for CTH R
Project
A motion was made by Member S. Potocki, seconded by Member S. Fritz to approve contract with Terra Ventures for Professional
Real Estate Services for CTH R Project . Motion carried by unanimous vote.
11. Discussion and Possible Action on 2027 Equipment Purchase – Underbody Plows
A motion was made by Member M.Jacowski, seconded by Member S. Potocki to approve 2027 Equipment Purchase – Underbody
Plows. Motion carried by unanimous vote.
NEXT MEETING DATE
Tuesday, August 18, 2026 - 3:30pm
ADJOURNMENT
Adjourned at 4:12 p.m.
Page 17 of 44
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
Date: August 11, 2026
To: Highway Committee
From: Nathan Check, P.E.
Subject: Discussion and Possible Action on Resolution Revising and Updating County
Ordinance 2.13.1, Establishment of Speed Zones
Background:
Wisconsin Statute 349.11 allows local authorities with respect to highways under their
jurisdiction to modify speed restrictions upon the basis of an engineering and traffic investigation
The resolution and proposed ordinance revisions are attached for the three speed zone areas
previously approved by the Highway Committee.
Analysis
The Committee has previously approved the changes to three county highways which are below.
-County Trunk Highway Y , Towns of Hull and Sharon. Forty-five miles per hour from the
junction of STH 66 northerly a distance of 1.35 miles to a point 1,200 feet north of Sharonwood
Lane
--County Trunk Highway DB, Town of Dewey. Forty-five miles per hour from the junction of
Interstate 39 northbound ramps northwesterly a distance of 1.3 miles to the Marathon County
Line.
- County Trunk Highway KK, Town and Village of Amherst. Forty-five miles per hour from a
point 480 feet north of Timberline Court southeasterly to a point 575’ north of CTH B/Western
Way/Wilson Street intersection.
-County Trunk Highway KK, Town and Village of Amherst. Thirty-five miles per hour from a
point 575’ north CTH B/Western Way/Wilson Street intersection southeasterly to a point 1,020
f eet south of the intersection with CTH B /Western Way / Wilson Street
- County Trunk Highway KK, Town and Village of Amherst. Forty-five miles per hour from a
point 1,020 feet south of the intersection with CTH B /Western Way / Wilson Street southeasterly
a distance of 1.55 miles to the junction of County Trunk Highway A.
Fiscal Impact:
There is no fiscal impact for these changes. The speed limit signs will be updated as part of the
general maintenance signing activities.
Recommendation:
Staff recommends approval of the ordinance revisions and corresponding Resolution.
approval.
Attachments: Resolution
Ordinance Revisions
Page 18 of 44
Created: 2025-10-02 11:53:56 [EST]
(Supp. No. 6)
Page 1 of 5
2.13.1 Establishment of Speed Limits.
A traffic and engineering investigation having been made on the following described highways, the maximum
permissible speeds at which vehicles may operate on said highways, which speeds are hereby established as
reasonable subject to the approval of the State Highway Commission, shall be as set forth below upon the erection
of standard signs giving notice thereof, all in Portage County Wisconsin:
(1) County Trunk Highway A, Village of Almond. Twent y-five miles per hour from the junction of County
Trunk Highway J northerly a distance of 0.44 miles to a point 420 feet north of the junction of Mill
Street.
(2) County Trunk Highway A, Village of Almond. Thirt y-five miles per hour from a point 685 feet north of
the junction of Mill Street northerly a distance of 0.2 miles to the junction of Second Avenue.
(3) County Trunk Highway A, Town of Amherst. Forty- five miles per hour from a point 540 feet west of the
junction of the USH 10 Eastbound Ramp northerly a distance of 0.24 miles to the junction of County
Trunk Highway KK/Western Way.
(4) County Trunk Highway B, Village of Plover. Thirt y-five miles per hour from the junction of Business
Highway "51" a/k/a Post Road easterly for a distance of 1.3 miles to the junction of Interstate 39
northbound ramps.
(5) County Trunk Highway B, Village of Plover. Forty -five miles per hour from the junction of Interstate 39
northbound ramps easterly for a distance of 1.7 miles to a point 1,584 feet east of Kennedy Avenue.
(6) County Trunk Highway B Town of Stockton. Forty- five miles per hour from a point 1,450 feet west of
the junction of County Trunk Highway J easterly a distance of 0.55 miles to a point 1,610 feet east of
the junction of County Trunk Highway J.
(7) County Trunk Highway B/Western Way, Town of Amh erst. Forty-five miles per hour from a point 715
feet west of the junction of Mill Road easterly 1.1 miles to the junction of County Trunk Highway KK.
(8) County Trunk Highway B, Town of Amherst. Forty- five miles per hour from the junction of County
Trunk Highway KK northerly a distance of 1.63 miles to the junction of a point 1,830 feet east of the
junction of McKinley Street.
(9) County Trunk Highway D, Village of Almond. Thirt y-five miles per hour from a point 140 feet west of
Elm Street easterly a distance of 0.25 miles to a point 450 feet west of the junction of Church Street.
(10) County Trunk Highway D, Village of Almond. Twen ty-five miles per hour from a point 450 feet west of
the junction of Church Street easterly a distance of 0.67 miles to a point 1,570 feet east of the junction
of Fourth Street.
(11) County Trunk Highway D, Village of Almond. Thir ty-five miles per hour from a point 560 feet east of the
junction of Fourth Street easterly a distance of 0.19 miles.
(12) County Trunk Highway D, Towns of Stockton, Amh erst, Buena Vista, and Lanark. Forty-five miles per
hour from the junction of County Trunk Highway J easterly a distance of 7.8 miles to the junction with
County Trunk Highway A.
(13) County Trunk Highway E, Towns of Linwood and C arson. Forty-five miles per hour from the junction
with County Trunk Highway C northerly for a distance of 1.16 miles to the junction of County Trunk
Highway HH.
(14) County Trunk Highway E, Town of Eau Pleine. Tw enty-five miles per hour from a point 870 feet east of
Bridge Road easterly and southerly a distance of 0.57 miles to a point 220 feet south of DuBay Colony
Road.
Page 19 of 44
Created: 2025-10-02 11:53:56 [EST]
(Supp. No. 6)
Page 2 of 5
(15) County Trunk Highway G, Village of Junction Cit y. Twenty-five miles per hour from the junction of
County Trunk Highway P northerly a distance of 0.53 miles to a point 110 feet north of North Limits
Road.
(16) County Trunk Highway I, Town of Sharon. Forty- five miles per hour from the junction with County
Trunk Highway Z northerly a distance of 2.75 miles to the junction of Stoney Hill Drive.
(17) County Trunk Highway J, Village of Almond. Thir ty-five miles per hour from a point 1,980 feet south of
the junction of County Trunk Highway D northerly a distance of 0.18 miles.
(18) County Trunk Highway J, Village of Almond. Twen ty-five miles per hour from a point 1,060 feet south of
the junction County Trunk Highway D northerly a distance of 0.80 miles to a point 685 feet north of the
junction of Mill Street.
(19) County Trunk Highway J, Village of Almond. Thir ty-five miles per hour from a point 685 feet north of
the junction of Mill Street northerly a distance of 0.2 miles to the junction of Second Avenue.
(20) County Trunk Highway J, Town of Stockton. Fort y-five miles per hour from the junction of County Trunk
Highway B northerly 1,060 feet.
(21) County Trunk Highway J, Town of Stockton. Twen ty-five miles per hour from a point 1,060 feet north of
the junction of County Trunk Highway B northerly a distance of 0.3 miles to a point 2,640 feet north of
the junction of County Trunk Highway B.
(22) County Trunk Highway J, Town of Stockton. Fort y-five miles per hour from a point 2,640 feet north of
the junction of County Trunk Highway B northerly a distance of 0.55 miles to a point 300 feet north of
the junction of Fourth Avenue.
(23) County Trunk Highway J, Town of Stockton. Fort y-five miles per hour a point 320 feet south of Old 18
Road northerly a distance of 1.32 miles to a point 1,740 feet north of Custer Square.
(24) County Trunk Highway K, Town of Stockton. Fort y-five miles per hour from the junction of County
Trunk Highway D northerly a distance of 2.15 miles to the junction of County Trunk Highway B.
(25) County Trunk Highway K, Town of Stockton. Thir ty-five miles per hour from the junction of USH 10
northerly a distance of 0.45 miles to the junction of Esker Road/Kisting Lane.
(26) County Trunk Highway K, Towns of Stockton and Sharon. Forty-five miles per hour from the junction of
Esker Road/Kisting Lane northerly 3.4 miles to a point 700 feet south of John's Lane.
(27) County Trunk Highway K, Town of Sharon. Thirty -five miles per hour from a point 700 feet south of
John's Lane northerly a distance of 0.49 miles to the junction of County Trunk Highway Z.
(28) County Trunk Highway K, Town of Sharon. Thirty -five miles per hour from the junction County Trunk
Highway Z northerly a distance .35 miles to the junction of STH 66.
(29) County Trunk Highway M, Town of Carson. Thirty -five miles per hour from a point 440 feet east of the
junction of North Oak Road easterly a distance of 0.41 miles to the junction of Arts Lane.
(30) County Trunk Highway P, Village of Junction Cit y. Thirty-five miles per hour from a point 295 feet west
of Kramer Avenue easterly a distance of 0.29 miles to a point 520 feet west of County Trunk Highway
G.
(31) County Trunk Highway P, Village of Junction Cit y. Twenty-five miles per hour from a point 520 feet west
of the junction of County Trunk Highway G easterly a distance of 0.85 miles to a point 350 feet east of
Tyler Road.
(32) County Trunk Highway Q, Town of Amherst. Forty -five miles per hour from the junction of County
Trunk Highway D northerly a distance of 3.2 miles to the junction of County Trunk Highway B.
Page 20 of 44
Created: 2025-10-02 11:53:56 [EST]
(Supp. No. 6)
Page 3 of 5
(33) County Trunk Highway Q, Village of Amherst Junc tion. Twenty-five miles per hour from the junction of
Main Street westerly and northerly to the junction of County Trunk Highway KK.
(34) County Trunk Highway Q, Village of Nelsonville. Thirty miles per hour from the junction of County
Trunk Highway SS (west) northerly a distance of 0.64 miles to a point 1,710 feet south of the junction
of STH 161.
(35) County Trunk Highway Q, Village of Nelsonville. Forty-five miles per hour from a point 1,710 feet south
of the junction of STH 161 northerly a distance of 0.32 miles to the junction of STH 161.
(36) County Trunk Highway R, Village and Town of Plo ver. Forty-five miles per hour from the junction of STH
54 northerly for a distance of 2.6 miles to a point 250 feet north of Black Oak Drive.
(37) County Trunk Highway R, Village of Plover. Fort y miles per hour from a point 250 feet north of the
junction of Black Oak Drive northerly for a distance of 2.45 miles to the junction of County Trunk
Highway HH.
(38) County Trunk Highway R, City of Stevens Point. Forty-five miles per hour from the junction of County
Trunk Highway HH northerly for a distance of 1.2 miles to a point 280 feet south of the junction of
Elmwood Road.
(39) County Trunk Highway R, City of Stevens Point. Thirty-five miles per hour from a point 280 feet south of
the junction of Elmwood Road northerly for a distance of 0.6 miles to its intersection of USH 10.
(40) County Trunk Highway U, Town of Grant. Forty-f ive miles per hour from the junction with County Trunk
Highway W, Town Line Road northerly a distance of 1.25 miles to a point 300 feet north of the junction
of Ruby Avenue.
(41) County Trunk Highway U, Town of Grant. Thirty- five miles per hour from a point 300 feet north of Ruby
Avenue northerly a distance of 0.5 miles to the junction with South Park Road.
(42) County Trunk Highway U, Town of Grant. Forty-f ive miles per hour from the junction of South Park
Road northerly a distance of 0.75 miles to the junction of County Trunk Highway FF/County Trunk
Highway W(West).
(43) County Trunk Highway V, Town of Amherst. Forty- five miles per hour from the junction of County
Trunk Highway A/B easterly a distance 2.1 miles to the function of County Trunk Highway T.
(44) County Trunk Highway W, Town of Pine Grove. Th irty-five miles per hour from a point 720 feet north of
the junction of Central Sands/Saddle Sore Lane southerly and easterly a distance of 1.12 miles to the
junction of Isherwood Road.
(45) County Trunk Highway W, Town of Pine Grove. Fo rty-five miles per hour from the junction of
Isherwood Road easterly a distance of 1.36 miles.
(46) County Trunk Highway Y, Town of Hull and Sharon. Forty-five miles per hour from the junction of STH
66 northerly a distance of 1.35 0.56 miles to a point 1,200 feet north of Sharonwood Lane .
(47) County Trunk Highway Z, Town of Sharon. Thirty -five miles per hour from the junction of STH 66
southerly and easterly for a distance of 1.00 mile to a point 120 feet east of the junction of Edgewood
Road.
(48) County Trunk Highway Z, Town of Sharon. Forty- five miles per hour from a point 120 feet east of the
junction of Edgewood Road easterly for a distance of 0.39 miles.
(49) County Trunk Highway FF, Town of Grant. Forty- five miles per hour from the junction of County Trunk
Highway U easterly a distance of 1.91 miles to a point 500 feet east of the junction of 95th Street.
Page 21 of 44
Created: 2025-10-02 11:53:56 [EST]
(Supp. No. 6)
Page 4 of 5
(50) County Trunk Highway HH, Town of Carson. Forty -five miles per hour from the junction of County
Trunk Highway HH/P northerly a distance of 0.28 miles to a point 765 feet south of the junction of USH
10 Eastbound Ramps.
(51) County Trunk Highway HH, City of Stevens Point . Thirty-five miles per hour from a point 1,530 feet
west of the junction of West Harding Avenue easterly for a distance of 0.24 miles to a point 245 feet
west of the junction of West Harding Avenue.
(52) County Trunk Highway HH, City of Stevens Point . Twenty-five miles per hour from a point 245 feet west
of the junction of West Harding Avenue easterly for a distance of 0.25 miles to the Junction of STH
66/Clark Street.
(53) County Trunk Highway HH, City of Stevens Point . Forty-five miles per hour from the junction of STH 66
easterly for a distance of 1.41 miles to a point 2,450 feet east of the junction of West River Drive.
(54) County Trunk Highway HH, City of Stevens Point and Village of Whiting. Thirty-five miles per hour from
a point 2,450 feet east of the junction of West River Drive easterly for distance of 1.98 miles to the
junction of Business Highway "51" a/k/a Post Road.
(55) County Trunk Highway HH, Village of Whiting. Tw enty-five miles per hour from the junction of Business
Highway "51" a/k/a Post Road easterly for a distance of 0.8 miles to a point 560 feet east of the
junction of Feltz Avenue.
(56) County Trunk Highway HH, Village of Whiting and City of Stevens Point. Thirty-five miles per hour from
a point 560 feet east of the junction of Feltz Avenue easterly a distance of 1.74 miles to a point 475
feet east of the junction of Venture Drive.
(57) County Trunk Highway HH, City of Stevens Point . Forty-five miles per hour from a point 475 feet east of
the junction of Venture Drive easterly a distance of 0.39 miles to a point 900 feet east of Badger
Avenue.
(59) County Trunk Highway KK, Town and Village of Am herst. Thirty-five miles per hour from a point 800
feet south of Timberline Court southeasterly a distance of 1.55 miles to the junction of County Trunk
Highway A. 575’ north CTH B/Western Way/Wilson Street intersection southeasterly to a point 1,020
feet south of the intersection with CTH B /Western Way / Wilson Street.
(59) County Trunk Highway MM, Town of New Hope. For ty-five miles per hour from a point 300 feet east of
the junction of Taylor Road easterly a distance 0.45 miles to a point 300 feet west of the junction of
Sunset Lake Road.
(60) County Trunk Highway PP, Town of Linwood. Fift y miles per hour from the Wood County Line easterly
to 900 feet northwest of Mill Creek Road.
(61) County Trunk Highway PP, Town of Linwood. Fort y-five miles per hour from a point 900 feet northwest
of Mill Creek Road easterly a distance of 1.0 mile to the junction of STH 66.
(62) County Trunk Highway QQ, Town of Stockton. For ty-five miles per hour from the junction of USH 10
northerly a distance of 1.34 miles to the junction of Rolling Hills Road.
(63) County Trunk Highway SS, Village of Nelsonville . Twenty-five miles per hour from the junction of High
Street southerly and easterly a distance of 2,515 feet.
(64) County Trunk Highway SS, Village of Nelsonville . Twenty-five miles per hour from the junction of
County Trunk Highway Q westerly a distance of 1,960 feet.
(65) County Trunk Highway WW, Town of Grant. Thirty -five miles per hour from the junction of County
Trunk Highway U easterly 0.6 miles to a point 0.25 miles west of the junction of 90th Street.
Page 22 of 44
Created: 2025-10-02 11:53:56 [EST]
(Supp. No. 6)
Page 5 of 5
(66) County Trunk Highway WW, Town of Grant. Forty- five miles per hour from a point 0.25 miles west of
the junction of 90th Street easterly a distance of 3.25 miles to the junction of County Trunk Highway F.
(67) County Trunk Highway DB, Town of Dewey. Forty-five miles per hour from the junction of Interstate 39
northbound ramps northwesterly a distance of 1.3 miles to the Marathon County Line.
(68) County Trunk Highway KK, Town and Village of Am herst. Forty-five miles per hour from a point 480 feet
north of Timberline Court southeasterly to a point 575’ north of CTH B/Western Way/Wilson Street
intersection.
(69) County Trunk Highway KK, Town and Village of Amherst. Forty-five miles per hour from a point 1,020
feet south of the intersection with CTH B /Western Way / Wilson Street southeasterly a distance of
1.55 miles to the junction of County Trunk Highway A.
Page 23 of 44
RESOLUTION NO. _____________
TO: THE HONORABLE CHAIRMAN AND MEMBERS OF THE PORTAGE COUNTY
BOARD OF SUPERVISORS:
RE: REVISING AND UPDATING PORTAGE COUNTY ORDINANCE 2.13.1
ESTABLISHMENT OF SPEED ZONES
WHEREAS, Wisconsin Statute 349.11 allows local authorities with respect to highways under
their jurisdiction to modify speed restrictions upon the basis of an engineering and traffic investigation;
and
WHEREAS, traffic and engineering investigations have been made on the following described
highways: County Trunk Highway DB in the Town of Dewey, CTH Y in the Towns of Hull and Sharon,
and CTH KK in the Town and Village of Amherst; and
WHEREAS, the maximum permissible speed at which vehicles may be operated on said highway
which speed is herewith established as reasonably and safe pursuant to Wisconsin Statute 346.57 and
349.11, shall be set forth herein, subject to the erection of standard signs given notice thereof; and
FISCAL NOTE: Funds for the replacement signs have already been allocated, budgeted and
approved as part of the 2026 county maintenance budgets and adopted by the county board. A budget
adjustment is not needed; and
NOW, THEREFORE, BE IT RESOLVED, by the Portage County Board of Supervisors that the
following speed zones are established for the following County Trunk Highways:
-County Trunk Highway Y, Towns of Hull and Sharon. Forty-five miles per hour from the
junction of STH 66 northerly a distance of 1.35 miles to a point 1,200 feet north of Sharonwood
Lane
--County Trunk Highway DB, Town of Dewey. Forty-five miles per hour from the junction of
Interstate 39 northbound ramps northwesterly a distance of 1.3 miles to the Marathon County
Line.
- County Trunk Highway KK, Town and Village of Amherst. Forty-five miles per hour from a
point 480 feet north of Timberline Court southeasterly to a point 575’ north of CTH B/Western
Way/Wilson Street intersection.
-County Trunk Highway KK, Town and Village of Amherst. Thirty-five miles per hour from a
point 575’ north CTH B/Western Way/Wilson Street intersection southeasterly to a point 1,020
feet south of the intersection with CTH B /Western Way / Wilson Street
- County Trunk Highway KK, Town and Village of Amherst. Forty-five miles per hour from a
point 1,020 feet south of the intersection with CTH B /Western Way / Wilson Street southeasterly
a distance of 1.55 miles to the junction of County Trunk Highway A.
BE IT FURTHER RESOLVED, the Portage County Board of Supervisors hereby approves,
adopts, and enacts the attached amendment to the Portage County Code of Ordinances 2.13.1
Establishment of Speed Zones; and
BE IT FURTHER RESOLVED, that the foregoing revisions to the Portage County Code of
Ordinances be posted to the world wide web from the County’s website, along with written paper format
to remain available in the County Clerk’s office.
DATED THIS 15
TH DAY OF SEPTEMBER 2026
Page 24 of 44
RESPECTFULLY SUBMITTED
PORTAGE COUNTY HIGHWAY COMMITTEE
Date: Augst 18, 2026
______________ ____________
Dave Ladick(Chair) Steve Cieslewicz (Vice Chair)
____________ ____________
Stan Potocki Matt Jacowski
_____________
Steve Fritz
Page 25 of 44
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
Date: August 11, 2026
To: Highway Committee
From: Nathan Check, P.E.
Subject: Discussion and Possible Action on 2026-19PC Bid – C urb & Gutter, Concrete Surface
Drain Project
Background:
Highway staff had worked with the Purchasing Department to issue a Request for Bids for curb
& gutter and concrete surface drains for the CTH D project. The work consists of 960 feet of
concrete curb & gutter and 2 CY of concrete surface drains.
Analysis:
Three bids were received and are summarized below.
1. Concrete Creations of WI, Inc. Ringle WI $35,000. 00
2. Chippewa Concrete Services, Inc. Chippewa Falls, WI $35,426.48
3. Norcon Corp. Schofield, WI $51,210.00
After the bid opening, the low bidder notified the Purchasing Department that they would not be
able to meet the project timelines required in the contract.
Fiscal Impact:
There are adequate funds in the CTH D construction budge to complete this work.
Recommendation:
Staff recommends the contract award to Chippewa Concrete Services, Inc.as they are the next
lowest bid that is able to complete the project within the project timelines.
Attachments: None
Page 26 of 44
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
Date: August 11, 2026
To: Highway Committee
From: Nathan Check, P.E.
Subject: Discussion and Possible Action on 2026-21PC Bid – Q uad Axle Body Build
Background:
Highway staff had worked with the Purchasing Department to issue a Request for Bids for the
quad axle dump truck body build for our 2027 chassis.
Analysis:
Two bids were received and are summarized below.
1. Stainless & Repair, Inc. Marshfield, WI $54,735. 00
2. Upfit Works, LLC Green Bay, WI $59,976.00
For reference, Stainless & Repair pricing in 2024 was $53,775.00 for this same type of build.
Fiscal Impact:
The 2027 equipment budget will include $245,000 for the new quad axle dump truck which will
adequately cover the chassis and build costs.
Recommendation:
Staff recommends the award to Stainless & Repair, Inc. They have completed this work as well
as our patrol truck builds at a high quality in the past.
Attachments: None
Page 27 of 44
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
Date: August 11, 2026
To: Highway Committee
From: Nathan Check, P.E.
Subject: Discussion and Possible Action on 2026-22PC Bid – S now and Ice Equipment
Installation
Background:
Highway staff had worked with the Purchasing Department to issue a Request for Bids for the
the snow and ice equipment installation for our 2027 chassis.
Analysis:
One bid was received and is summarized below.
1. Stainless & Repair, Inc. Marshfield, WI $342,000.0 0 base bid ($171,000/truck)
$16,130.00 for increased anti-ice capability
For reference, Stainless & Repair pricing per truck in 2026 was $171,991.00 for this same type
of base build. In 2024 and 2025, the pricing was between $161k to $164k per truck.
Fiscal Impact:
The 2027 equipment budget will include $440,000 per truck for the new patrol trucks which will
cover the chassis and build costs.
Recommendation:
Staff recommends the award to Stainless & Repair, Inc. They have completed this work at a
high quality in the past.
Attachments: None
Page 28 of 44
Portage County 800 Plover Road
Highway Department Plover, WI 54467
Nathan Check, PE Phone: 715-345-5355
Commissioner Fax: 715-345-5356
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patr ol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assista nt Patrol Manager – Bob Lang
Finance Office Supervisor – Stacy Zerby Financia l Associate III – Kristen Hancock
Date: August 11, 2026
To: Highway Committee
From: Nathan Check, P.E.
Subject: Discussion and Possible Action on 2027 Equipment Purchase – Snow and Ice
Equipment
Background:
Since 2014, the Department has been approved for single source purchasing through Burke for
our snow and ice equipment for our patrol trucks. This equipment has been purchased directly
from Burke versus the past practice of including it as equipment specified in our patrol truck
build bids for two main reasons:
1. Cost-savings through the direct purchase with no additional mark-up or sales tax
2. Separating the snow and ice equipment into separ ate contracts allow for
additional vendors to bid on the build contracts
3. Build-time and issue response times for the snow and ice equipment have
improved through the direct contact.
Over the years, costs have continued to increase and staff has researched other possible vendors.
As stated in last year’s memo, the Highway Department would be completing a full review as
part of the 2027 builds to evaluate other vendors as well. One vendor with comparable products
and positive reference checks was Universal Truck who has also supplied our underbodies in the
past. They also have pricing through a Minnesota DOT state contract.
Analysis:
Pricing for the equipment was compared between the two vendors and are summarized below.
1. Universal $106,326.00
2. Burke $137,933.13
For comparison, last year’s price from Burke was $104,595.00 for similar equipment.
Fiscal Impact:
The 2027 equipment budget will include $440,000 per truck for the new patrol trucks which will
cover the chassis, equipment, and build costs.
The two plow chassis and their equipment will be included in next year’s Machinery budget but
it is prudent to lock these prices in now to avoid any large equipment price increases or
surcharges.
Page 29 of 44
Portage County 800 Plover Road
Highway Department Plover, WI 54467
Nathan Check, PE Phone: 715-345-5355
Commissioner Fax: 715-345-5356
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patr ol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assista nt Patrol Manager – Bob Lang
Finance Office Supervisor – Stacy Zerby Financia l Associate III – Kristen Hancock
Recommendation:
Staff recommends that the Committee review and approve the purchase of the snow and ice
equipment from Universal. In addition to the $106,326.00, Universal will also mount the
underbodies that we have committed to purchasing from them and this cost will be reduced from
the truck build contract. The total contract with Universal would then total $11.806.00.
Attachments: None
Page 30 of 44
Portage County 800 Plover Road
Highway Department Plover, WI 54467
Nathan Check, PE Phone: 715-345-5355
Commissioner Fax: 715-345-5356
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patr ol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assista nt Patrol Manager – Bob Lang
Finance Office Supervisor – Stacy Zerby Financia l Associate III – Kristen Hancock
Date: August 11, 2026
To: Highway Committee
From: Nathan Check, P.E.
Subject: Discussion and Possible Action on Resolution to Portage County Ordinance Chapter 2
Public Peace and Order, Section 2.28 Regulation of Boating Upon Bear Creek
Background:
The CTH II bridge over Bear Creek located north of CTH PP in the Town of Linwood is
scheduled to be replaced in 2027 as part of the Wisconsin Department of Transportation’s(DOT)
Local Bridge Improvement Assistance Program.
As part of the agency and environmental
coordination for the project, the Wisconsin Department of Natural Resources(DNR) is requiring
boating restrictions under the bridge during construction due to safety concerns
Analysis:
Wisconsin state law allows counties, towns, villages, cities, public inland lake protection and
rehabilitation districts and town sanitary districts to enact local boating regulations in the interest
of public health, safety or welfare, which includes the public’s interest in preserving the state’s
natural resources. State boating law provides a general framework for regulation, but it is up to
the governing entity to provide regulations tailored to local conditions.
The DNR provides a template ordinance to utilize for these types of projects and it is attached. It
is a similar ordinance which was utilized during the 2019 CTH A bridge over the Tomorrow
River project.
While Bear Creek has less recreational traffic than the Tomorrow River, it does provide for an
extra level of safety to pass the ordinance and restrict boat traffic during construction.
Fiscal Impact:
There is no fiscal impact on the County for passing the ordinance.
Recommendation:
Staff recommends that the Committee review and approve the attached resolution and ordinance.
Attachments: Resolution
Ordinance 2.28
Page 31 of 44
2.29 REGULATION OF BOATING UPON BEAR CREEK
2.29.1 - Applicability and Enforcement. The provisions of this Ordinance shall apply to the waters of Bear
Creek. This chapter shall be enforced by the officers of Portage County.
2.29.2 - Intent. The intent of this ordinance is to provide safe and healthful conditions for the enjoyment
of aquatic recreation consistent with public rights and interests and the capability of the water resources.
2.29.3 - State Boating and Safety Laws Adopted. State boating laws as found in Wis. Stats. §§ 30. 50 –
30.71 are adopted by reference.
2.29.4 - Penalties. Wisconsin state boating penalties as found in Wis. Stats. § 30.80 and deposits
established in the Uniform Deposit and Bail Schedule established by the Wisconsin Judicial Conferences,
are hereby adopted by reference and all references to fines amended to forfeitures and all references to
imprisonment deleted.
2.29.5 - Severability. The provisions of this ordinance shall be deemed se verable and it is expressly
declared that Portage County would have passed the other provisions of this ordinance irrespective of
whether or not one or more provisions may be declared invalid. If any provision of this ordinance or the
application to any person or circumstances is held invalid, the remainder of the ordinance and the
application of such provisions to other persons or circumstances shall not be affected.
2.29.6 - Boat Restriction Area. No person shall operate a motorboat or nommotoriz ed boat, as defined
in Wis. Stats. §§ 30.50(6) and 30.50(7) on the waters of Bear Creek within the right of way at the crossing
of County Highway II during the bridge construction project. The boat restriction area will be in pla ce
from April 1, 2027 to October 31, 2027.
2.29.7 - Posting Requirements. Portage County shall place and maintain a synopsis of this ordinance at all
public access points within the jurisdiction of the County pursuant to the requirements of Wis. Admin.
Code § NR 5.15.
2.29.8 - Effective Date. This ordinance shall take effect on April 1, 2027.
2.29.9 - Sunset Date. This ordinance will therefore sunset at midnight on October 31, 2027 unless
otherwise amended, rescinded, or extended by future action by the Portage County Board of
Supervisors.
Page 32 of 44
RESOLUTION NO. _____________
TO: THE HONORABLE CHAI AND MEMBERS OF THE PORTAGE COUNTY BOARD OF
SUPERVISORS:
RE: REVISION TO PORTAGE COUNTY ORDINANCE CHAPTER 2 PUBLIC PEACE AND
ORDER, CREATING SECTION 2.29 REGULATION OF BOATING UPON BEAR CREEK
WHEREAS, the CTH II bridge over Bear Creek located north of CTH PP in the Town of
Linwood is scheduled to be replaced in 2027 as part of the Wisconsin Department of Transportation’s
Local Bridge Improvement Assistance Program; and
WHEREAS, as part of the agency and environmental coordination for the project, the Wisconsin
Department of Natural Resources is requiring boating restrictions under the bridge during construction
due to safety concerns; and
WHEREAS, state law allows counties, towns, villages, cities, public inland lake protection and
rehabilitation districts and town sanitary districts to enact local boating regulations in the interest of
public health, safety or welfare, which includes the public’s interest in preserving the state’s natural
resources. State boating law provides a general framework for regulation, but it is up to the governing
entity to provide regulations tailored to local conditions; and
WHEREAS, the authority to enact local regulation is found in Wis. Stats. Chapter 30, sections
30.77(2) and 30.77(3) (Local Regulation of Boating), and Wis. Stats. Chapter 33; and
WHEREAS, based on the foregoing, this purpose of this resolution is to approve Portage County
Code of Ordinances Section 2.29 Regulation of Boating Upon Bear Creek, as set forth in the attachment.
FISCAL NOTE: There are no fiscal obligations for the county associated with this resolution.
NOW, THEREFORE, BE IT RESOLVED that the Portage County Board of Supervisors hereby
approves, adopts, and enacts the attached revision to the Portage County Code of Ordinances by creating
the attached Section 2.29 Regulation of Boating Upon Bear Creek.
DATED THIS 15
th DAY OF September, 2026
RESPECTFULLY SUBMITTED,
HIGHWAY COMMITTEE
Date: August 18, 2026
______________ ______________
Dave Ladick - Chair Steve Cieslewicz - Vice Chair
____________ ____________
Stan Potocki Matt Jacowski
_____________
Steve Fritz
Page 33 of 44
Portage County 800 Plover Road
Highway Department Plover, WI 54467
Nathan Check, PE Phone: 715-345-5355
Commissioner Fax: 715-345-5356
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patr ol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assista nt Patrol Manager – Bob Lang
Finance Office Supervisor – Stacy Zerby Financia l Associate III – Kristen Hancock
Date: August 11, 2026
To: Highway Committee
From: Nathan Check, P.E.
Subject: Discussion and Possible Action on Resolution to CTH R(STH 54 to CTH B)
Relocation Order and Plat
Background:
Attached is the final plat and relocation order for the CTH R reconstruction project planned for
2028.
Analysis:
The project will require fee and temporary limited easement acquisitions from 12 parcels plus 9
release of utility rights.
Fiscal Impact:
While there is not fee for the plat and relocation order, there will be costs associated with the
actual acquisition. As mentioned in last months memo regarding the acquisition consultant, the
local costs for the CTH R project which include real esteate will be covered by the Village of
Plover per the Memorandum of Understanding(MOU) and Jurisdictional Transfer
Agreement(JTA) for the CTH R corridor. These costs will be billed back to the Village upon the
County receiving the invoicing.
Recommendation:
Staff recommends that the Committee review and approve the attached relocation order and plat.
Attachments: CTH R Relocation Order
CTH R Plat
Page 34 of 44
RELOCATION ORDER
RE1708 01/2023
Project ID
6808-03-00
Road name
CTH R
Highway
STH 54 – USH 10
STH 54 to CTH B
County
Portage
Right of way plat date
Plat sheet number(s)
4.01-4.07
Previously approved Relocation Order date
N/A
Description of termini of project:
Beginning at a point 58.255 feet north and 602.571 feet west of the Southeast corner of Section 35, T23N, R8E; thence
northerly 2.008 miles to a point 195.070 feet south and 62.722 feet east of the Northeast corner of Section 26, T23N,
R8E;
Begin Coordinate:
Y = 167168.386
X = 182192.662
End Coordinate:
Y = 177461.337
X = 182843.707
To properly establish, layout, widen, enlarge, extend, construct, reconstruct, improve, or maintain a portion of the highway
designated above, it is necessary to relocate or change and acquire certain lands or interests in lands as shown on the
right of way plat for the above project.
To effect this change, pursuant to authority granted under Sections 83.07 and 83.08, Wisconsin Statutes, Portage County
orders that:
1. The said highway is laid out and established to the lines and widths as shown on the plat.
2. The required lands or interests in lands as show n on the plat shall be acquired by in the name of Portage County,
pursuant to the provisions of Section 84.09(1) or (2), Wisconsin Statutes.
3. This order supersedes and amends any previous or der issued by the Agency.
Approving Authority Date
Print Name
Page 35 of 44
Little
Plover
R.
PLOVER
B
Arnott
54
Plover
51
BUS
R
151
153
TOMORROW
R/W PROJECT NUMBER
PLOT NAME : X:\PT\P\PORTH\185422\4-PRELIM-DSGN-RPTS\CIVIL 3D-CTH R\RW\DWG\040101-RP.DWGFILE NAME :8/11/2026 2:52 PMPLOT DATE :PLOT BY :SEH
FEDERAL PROJECT NUMBER
SHEET
NUMBER
TOTAL
SHEETS
PLAT OF RIGHT OF WAY REQUIRED FOR
LAYOUT
SCALE0
TOTAL NET LENGTH OF CENTERLINE =
CONSTRUCTION PROJECT NUMBER
ACCEPTED FOR
DATE:
(Signature)
COUNTY
REVISION DATE
OFPORTAGE
6808-03-00
STH 54 - USH 10
STH 54 TO CTH B
CTH RPORTAGE COUNTY
4.01 7
1.0 MILES
2.008 MILES
6808-03-70
THIS PLAT IS A GRAPHIC REPRESENTATION AND IS FOR
REFERENCE PURPOSES ONLY. DEEDS MUST BE CHECKED TO
DETERMINE PROPERTY BOUNDARIES AND ACCESS RIGHTS.
CONVENTIONAL SYMBOLS
W
SECTION LINE
QUARTER LINE
SIXTEENTH LINE
NEW REFERENCE LINE
NEW R/W LINE
CORPORATE LIMITS
UNDERGROUND FACILITY
NEW R/W (FEE OR HE)
(HATCHING VARIES BY OWNER)
(COMMUNICATIONS, ELECTRIC, ETC)
EXISTING R/W OR HE LINE
PROPERTY LINE
R/W MONUMENT
TRNON-MONUMENTED
R/W POINT
FOUND IRON PINIP
(TYPE)
P.L.
SIGNOFF-PREMISE
SIGN
SIGN
SIGN
EASEMENT AREA
(PERMANENT LIMITED OR
RESTRICTED DEVELOPMENT)
BUILDING
TRANSMISSION STRUCTURES
ELECTRIC POLE
TELEPHONE POLE
PEDESTAL (LABEL TYPE)
(TV, TEL, ELEC, ETC.)
COMPENSABLE NON-COMPENSABLE
ACCESS RESTRICTED BY ACQUISITION
NO ACCESS (BY STATUTORY AUTHORITY)
ACCESS RESTRICTED (BY PREVIOUS
PROJECT OR CONTROL)
BRIDGE
PARCEL NUMBERUTILITY NUMBER2540
SIXTEENTH CORNER MONUMENT
#1-25
NW
TEMPORARY LIMITED
EASEMENT AREA
LOT, TIE & OTHER
MINOR LINES
GEODETIC SURVEY MONUMENT
SECTION
CORNER
SYMBOL
TO BE REMOVED
SECTION
CORNER
MONUMENT
(TO BE SET)
(1-INCH UNLESS NOTED)
SLOPE INTERCEPT
25 26
24 23
9
18
PARALLEL OFFSETS
NO ACCESS (NEW HIGHWAY)
CULVERT
CONVENTIONAL UTILITY SYMBOLS
W
G
T
OH
E
TV
FO
SAN
SS
WATER
GAS
TELEPHONE
OVERHEAD TRANSMISSION LINES
ELECTRIC
CABLE TELEVISION
FIBER OPTIC
SANITARY SEWER
STORM SEWER
ELECTRIC TOWER
ACCESS RIGHTSAR
ACRESAC
AHEADAH
ALUMINUMALUM
AND OTHERSET AL
BACKBK
BLOCKBLK
CENTERLINEC/L
CERTIFIED SURVEY MAPCSM
CONCRETECONC
COUNTYCO
COUNTY TRUNK HIGHWAY CTH
DISTANCEDIST
CORNERCOR
DOCUMENT NUMBERDOC
EASEMENT EASE
EXISTINGEX
GAS VALVEGV
GRID NORTHGN
HIGHWAY EASEMENTHE
IDENTIFICATIONID
LAND CONTRACTLC
LEFTLT
MONUMENTMON
NATIONAL GEODETIC SURVEY NGS
NUMBERNO
OUTLOTOL
PAGEP
POINT OF TANGENCYPT
PERMANENT LIMITED PLE
EASEMENT
POINT OF BEGINNINGPOB
POINT OF CURVATUREPC
POINT OF COMPOUND CURVE PCC
POINT OF INTERSECTIONPI
PROPERTY LINEPL
RECORDED AS(100')
REEL / IMAGER/I
REFERENCE LINER/L
REMAININGREM
RESTRICTIVE DEVELOPMENT RDE
EASEMENT
RIGHTRT
RIGHT OF WAYR/W
SECTIONSEC
SEPTIC VENTSEPV
SQUARE FEETSF
STATE TRUNK HIGHWAYSTH
STATIONSTA
TELEPHONE PEDESTALTP
TEMPORARY LIMITED TLE
EASEMENT
TRANSPORTATION PROJECT PLAT TPP
UNITED STATES HIGHWAY USH
VOLUMEV
CONVENTIONAL ABBREVIATIONS
CURVE DATA ABBREVIATIONS
/DELTA
LONG CHORDLCH
LONG CHORD BEARINGLCB
RADIUSR
DEGREE OF CURVED
CENTRAL ANGLE
LENGTH OF CURVEL
TANGENTT
DIRECTION AHEADDA
DIRECTION BACKDB
(Date) (Signature)
Original Plat Prepared by
END RELOCATION
STA 206+00.00
BEGIN RELOCATION
STA 100+00.00
Y = 167168.386
X = 182192.662
195.070 FEET SOUTH AND
62.722 FEET EAST OF THE
NORTHEAST CORNER OF
SECTION 26, T23N, R8E
58.255 FEET NORTH AND
602.571 FEET WEST OF THE
SOUTHEAST CORNER OF
SECTION 35, T23N, R8E
Y = 177461.337
X = 182843.707
R 8 E
T 23 N
POSITIONS SHOWN ON THIS PLAT ARE WISCONSIN COORDINATE REFERENCE SYSTEM COORDINATES (WISCRS), PORTAGE COUNTY , NAD83 (2011) IN US SURVEY FEET.
VALUES SHOWN ARE GRID COORDINATES, GRID BEARINGS, AND GRID DISTANCES. GRID DISTANCES MAY BE USED AS GROUND DISTANCES.
ALL NEW RIGHT-OF-WAY AND PERMANENT EASEMENT MONUMENTS WILL BE TYPE 2 MONUMENTS (TYPICALLY 34" X 24" IRON REBARS), UNLESS OTHERWISE NOTED, AND WILL
BE PLACED PRIOR TO THE COMPLETION OF THE PROJECT.
ALL RIGHT-OF-WAY LINES DEPICTED IN THE NON-ACQUISITION AREAS ARE INTENDED TO RE-ESTABLISH EXISTING RIGHT-OF-WAY LINES AS DETERMINED FROM PREVIOUS
PROJECTS, OTHER RECORDED DOCUMENTS, CENTERLINE OF EXISTING PAVEMENTS AND/OR EXISTING OCCUPATIONAL LINES..
RIGHT-OF-WAY BOUNDARIES ARE DEFINED WITH COURSES OF THE PERIMETER OF THE HIGHWAY LANDS REFERENCED TO THE U.S. PUBLIC LAND SURVEY SYSTEM OR OTHER
"SURVEYS OF PUBLIC RECORD".
DIMENSIONING FOR THE NEW MEASURED RIGHT-OF-WAY IS ALONG AND PERPENDICULAR TO NEW REFERENCE LINES.
A PERMANENT LIMITED EASEMENT (PLE) IS A RIGHT FOR CONSTRUCTION AND MAINTENANCE PURPOSES, AS DEFINED HEREIN, INCLUDING THE RIGHT TO OPERATE NECESSARY
EQUIPMENT THEREON AND THE RIGHT OF INGRESS AND EGRESS, AS LONG AS REQUIRED FOR SUCH PUBLIC PURPOSE, INCLUDING THE RIGHT TO PRESERVE, PROTECT, REMOVE,
OR PLANT THEREON ANY VEGETATION THAT THE HIGHWAY AUTHORITIES MAY DEEM DESIRABLE, BUT WITHOUT PREJUDICE TO THE OWNER'S RIGHTS TO MAKE OR CONSTRUCT
IMPROVEMENTS ON SAID LANDS OR TO FLATTEN THE SLOPES, PROVIDING SAID ACTIVITIES WILL NOT IMPAIR OR OTHERWISE ADVERSELY AFFECT THE HIGHWAY FACILITIES.
A TEMPORARY LIMITED EASEMENT (TLE) IS A RIGHT FOR CONSTRUCTION PURPOSES, AS DEFINED HEREIN, INCLUDING THE RIGHT TO OPERATE NECESSARY EQUIPMENT THEREON, THE
RIGHT OF INGRESS AND EGRESS, AS LONG AS REQUIRED FOR SUCH PUBLIC PURPOSE, INCLUDING THE RIGHT TO PRESERVE, PROTECT, REMOVE, OR PLANT THEREON ANY VEGETATION THAT
THE HIGHWAY AUTHORITIES MAY DEEM DESIRABLE. ALL (TLEs) ON THIS PLAT EXPIRE AT THE COMPLETION OF THE CONSTRUCTION PROJECT FOR WHICH THIS INSTRUMENT IS GIVEN.
PROPERTY LINES SHOWN ON THIS PLAT FOR PROPERTIES BEING IMPACTED ARE DRAWN FROM DATA DERIVED FROM FILED/RECORDED MAPS AND DOCUMENTS OF PUBLIC RECORD. THIS
PLAT MAY NOT BE A TRUE REPRESENTATION OF EXISTING PROPERTY LINES, EXCLUDING RIGHT-OF-WAY, AND SHOULD NOT BE USED AS A SUBSTITUTE FOR AN ACCURATE FIELD SURVEY.
FOR THE CURRENT ACCESS/DRIVEWAY INFORMATION, CONTACT THE PORTAGE COUNTY HIGHWAY DEPARTMENT.
PARCEL AND UTILITY IDENTIFICATION NUMBERS MAY NOT POINT TO ALL AREAS OF ACQUISITION, AS NOTED ON THE DETAIL PAGES.
INFORMATION FOR THE BASIS OF EXISTING HIGHWAY RIGHT-OF-WAY POINTS OF REFERENCE AND ACCESS CONTROL ARE LISTED ON THE DETAIL PAGES.
NOTES:
T 22 N
R 9 E
8/11/2026
Page 36 of 44
WISDOT/CADDS SHEET 75GRID FACTOR EHWY:COUNTY:CONSTRUCTION PROJECT NUMBERSTATE R/W PROJECT NUMBERDATEREVISION DATE0SCALE, FEETPS&EPLOT NAME : FILE NAME :8/11/2026 2:53 PMPLOT DATE :PLOT BY :SEH
44
PLAT SHEET SHEET X:\PT\P\PORTH\185422\4-prelim-dsgn-rpts\Civil 3D-CTH R\RW\DWG\040101-rp.dwg
PARCELNUMBERSHEETNUMBER OWNER(S)INTERESTREQUIREDTLEACRES24.04DUSTIN KARCHESKIFEE / TLE0.05-0.050.0334.04HEIDI A MANCHESKIFEE / TLE0.02-0.020.0154.04JON J HAMERSKIFEE / TLE1.38-1.380.0764.04RODNEY A & MELISSA J VEZINAFEE / TLE0.02-0.020.0174.04KELLY D & KARLA J AMBLEFEE / TLE0.01-0.010.01134.05MARY A HAMERSKI SURVIVORS TRUSTFEE / TLE0.01-0.010.40
SCHEDULE OF LANDS & INTERESTS REQUIREDOWNER'S NAMES ARE SHOWN FOR REFERENCE PURPOSES ONLY AND ARE SUBJECTTO CHANGE PRIOR TO TRANSFER OF LAND INTERESTS TO THE COUNTY.NEWEXISTINGTOTALR/W ACRESREQUIRED
CTH RPORTAGE6808-03-706808-03-00NTS 4.028-11-26N/A
144.05CTY R INVESTMENT LLCFEE / TLE1.44-1.440.05154.05MARLENE DUDAFEE / TLE0.31-0.310.08164.07DEL MONTE FOODS CORPORATION II INCTLE---0.07174.06GALE M & PAUL R KIRBYTLE---0.02214.07JAMES & ANGELA DINKINSTLE---0.02224.07SANKEY ACRES LLCTLE---0.14504.04, 4.05, 4.07AT&T - COMMUNICATIONSRELEASE OF RIGHTS514.04, 4.05, 4.07WISCONSIN PUBLIC SERVICE - GASRELEASE OF RIGHTS524.04XCEL ENERGY - ELECTRICRELEASE OF RIGHTS-- - -544.04, 4.05, 4.07WISCONSIN PUBLIC SERVICE - ELECTRICRELEASE OF RIGHTS564.05, 4.07VILLAGE OF PLOVER - WATERRELEASE OF RIGHTS574.06, 4.07AMHERST TELEPHONE CO - COMMUNICATIONSRELEASE OF RIGHTS584.07VILLAGE OF PLOVER - SANITARY SEWERRELEASE OF RIGHTS614.05SPECTRUM - COMMUNICATIONSRELEASE OF RIGHTS
Page 37 of 44
100
105110115120125130135110R/L= N00°13'43"W
207
175180185190195200205
SEPV140145150155160165170
WISDOT/CADDS SHEET 75GRID FACTOR EHWY:COUNTY:CONSTRUCTION PROJECT NUMBERSTATE R/W PROJECT NUMBERDATEREVISION DATE0SCALE, FEETPS&EPLOT NAME : FILE NAME :8/11/2026 2:53 PMPLOT DATE :PLOT BY :SEH
44
PLAT SHEET SHEET X:\PT\P\PORTH\185422\4-prelim-dsgn-rpts\Civil 3D-CTH R\RW\DWG\040101-rp.dwg
SE-SEBEGIN RELOCATIONSTA 100+00.00
CTH R /EISENHOWER AVE
SECTION 35
CTH RPORTAGE6808-03-706808-03-00NTS 4.038-11-26N/A SW-SWSECTION 36
NE-SESECTION 35
SE-NESECTION 35
NW-SWSECTION 36
NE-SESECTION 26NW-SWSECTION 25
SW-NWSECTION 36
SE-SESECTION 26SW-SWSECTION 25
NE-SESECTION 26NW-SWSECTION 25
NE-NESECTION 26NW-NWSECTION 25
SW-NWSECTION 25
23 6 7 135
1514 17
2122
513 13
16
SW-NWSECTION 36SE-NESECTION 35
NW-NWSECTION 36NE-NESECTION 35
SE-NESECTION 26END RELOCATIONSTA 206+00.00
PLPLPLPL
PLPLPLPLPL
PLPLPL
PLPLPL
PL
PL
PLPLPLPLPLPLPLPL
PLPL
PLPL
PLPL PL PLPLPLPL
PL
PL PLPLPL PLPL PLPL
PL PL PL PLPLPLPLPLPLPLPL
PL
PL PL PLPLPLPLPL PLPL
PLPL
TOWN
VILLAGE
OFVILLAGEOFPLOVEROFPLOVER
OFPLOVER
TR35362123N8E TR2625353623N8E
TR2324262523N8E
TR353623N8E
TR262523N8E
CTH R /EISENHOWER AVE
CTH R /EISENHOWER AVE
JACKS DRBARBARA'S LNBEES LN
PLEASANT DR
TORREY PINES WAY
CLEARVIEW CT
SHADY DRGREEN PASTURES TRAIL
STH 54
CTH B /PLOVER RD
MATCHLINESTA 137+00
MATCHLINESTA 137+00 MATCHLINESTA 172+00
MATCHLINESTA 172+00 22
PL
VILLAGEOFPLOVER
TOWNOFPLOVERTOWNOFPLOVERPLPL
PL
PLPLPLPLPL
JUNEBERRY RDPEAR LN
BONNIE LN
PL
Page 38 of 44
WELLWELL 111GUYGUYGUY
GUYGUY
(?)FO(?)FO
(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO
(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO
(?)FO(?)FO
(?)T(?)T(?)T(?)FO(?)FO(?)FO
(?)FO
(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO
(?)FO
(?)FO
(?)FO
(?)FO
(?)FO
(?)FO
(?)FO
(?)FO
(?)FO
(?)FO
(?)FO
(?)FO
(?)FO
(?)FO
(?)FO
(?)FO
(?)FO
(?)FO
(?)FO
(?)FO
(?)FO
(?)FO
E
E
(?)G(?)G(?)G(?)G
OH
E
E E E E E E E E E E E E E E EEE EFO FO
G
G G G G G G G G G G G G G GG
OH
OH
OHOH
OH4265IP
4263IP
4261IP 4260IP 4259IP 4258IP 4257IP 4253IP 4252IP4251IP
100
105
110 115 120 125 130
R/L= N44°08'10"E
R/L= N66°49'20"E
PI STA = 100+91.31Y = 167209.363X = 182274.262D = 1°54'35"T = 91.31'L = 182.56'R = 3000.00'PC STA = 100+00.00PT STA = 101+82.56RTDELTA = 3°29'12"PI STA = 103+46.82Y = 167309.948X = 182509.196D = 11°27'33"T = 100.30'L = 197.97'R = 500.00'PC STA = 102+46.52PT STA = 104+44.49LTDELTA = 22°41'09"PI STA = 106+07.94Y = 167499.242X = 182692.867D = 4°39'29"T = 66.88'L = 133.63'R = 1230.00'PC STA = 105+41.06PT STA = 106+74.69LTDELTA = 6°13'29"PI STA = 107+78.40Y = 167633.830X = 182797.684D = 19°05'55"T = 103.71'L = 199.70'R = 300.00'PC STA = 106+74.69PT STA = 108+74.39LTDELTA = 38°08'24"
301303304305306 307308309310
311312325326100
103104105 106107108109
113114115116117118121122
120 119313
302
R/L= N00°13'43"W
PI 100+91.31
PI 103+46.82
PI 106+07.94102
PI 107+78.40
4256IP4255IP
112
110R/L= N00°13'43"W
PC 102+46.52
PC 105+41.06
PT 101+82.56
PT 104+44.49
PT 108+74.39
PCC 106+74.69
300
101
TLE STATION & OFFSET TABLEPOINT300301302303304305306307308309310311312313
STATION106+08.00106+54.61106+74.79106+52.00106+65.78107+68.10108+13.14120+13.12120+19.38120+85.42120+92.22128+44.28127+90.00110+92.00
OFFSET30.32' LT33.00' LT57.00' LT82.00' LT105.00' LT125.00' LT66.00' LT84.00' LT133.00' LT127.00' LT75.00' LT160.00' RT50.00' RT34.00' RT
R/W STATION & OFFSET TABLEPOINT100101102103104105106107108109110111112113114115116117118119120121122
STATION107+04.33106+72.64106+50.00106+95.15107+92.13108+50.00119+90.00120+19.64120+85.70121+09.00128+70.92128+71.85128+76.19128+43.21128+22.00119+57.00110+92.00110+92.00110+24.00110+24.00107+52.14107+42.66108+04.71
OFFSET46.96' RT0.00' RT27.33' LT75.00' LT77.00' LT40.50' LT48.52' LT94.00' LT85.00' LT49.27' LT54.07' LT0.00' RT127.38' RT128.50' RT50.00' RT50.00' RT50.00' RT23.14' RT23.57' RT34.00' RT63.79' RT59.59' RT0.00' RT
(?)FO(?)FO
EEFO
G130
WISDOT/CADDS SHEET 75GRID FACTOR EHWY:COUNTY:CONSTRUCTION PROJECT NUMBERSTATE R/W PROJECT NUMBERDATEREVISION DATE 0SCALE, FEET PS&EPLOT NAME : FILE NAME : 8/11/2026 2:53 PMPLOT DATE :PLOT BY :SEH
44
PLAT SHEET SHEET X:\PT\P\PORTH\185422\4-prelim-dsgn-rpts\Civil 3D-CTH R\RW\DWG\040101-rp.dwg
SE-SETOWN
PL
SECTION 35
CTH RPORTAGE6808-03-706808-03-004.048-11-26N/A 200100
CTH R / EISENHOWER AVE
BEE'S LNBARBARA'SLN JACK'S DRBONNIE LNSTH 54
STH 54
PRAIRIE DR
SHADY DR
OF
PLOVER
PL PLPLPLPL
PL
PL
PLPL
PL
PL
PL
PL
PLPL
PL
PL
PLPLPLPLPL
2 3 6 7
5
PL
TR35362123N8E
TR353623N8E
FOUND MONUMENTSDESCRIPTIONXYPOINT4265167305.101182317.5331" IP4263167395.969182548.0522" IP4261167902.180182754.0961" IP4260168102.284182751.9481" IP4259168291.961182749.9221" IP4258168482.063182748.1364257168672.125182746.3894256168882.175182744.5764255168948.026182743.2514253169318.072182739.4154252169517.959182737.2474251169557.988182737.038
1" IP1" IP1" IP LEANING1" IP1" IP1 1/4" IP1 1/4" IP
SW-SWSECTION 36
SEE SHEET 4.05
NW-SWSECTION 36
NE-SESECTION 35
FOUND HARRISON MONY= 167110.131X= 182795.2334298
50COMPUTED POSITIONFROM TIESSTA 128+71.14, 21.07' LTY= 169734.180X= 182768.237110'
66'
66' 66'
PRAINWOOD ESTATESDOC 333177
36
35
34
33 32 31 30 29 28 27
16 15 141312
OL 2
SECTION LINEAPPROXIMATE SECTION LINEAPPROXIMATE SIXTEENTH LINE
APPROXIMATEQUARTER LINE
B
B
BB B B B B B B BB BBBB B
B B
DUSTINKARCHESKIHEIDI AMANCHESKI RODNEY A &MELISSA JVEZINAKELLY D &KARLA J AMBLE
JON J HAMERSKI
PLPL
FEE 0.05 AC
TLE 0.02 ACTLE 0.01 ACTLE 0.01 AC TLE 0.01 ACTLE 0.01 AC
TLE SLOPES 0.05 AC
FEE 0.02 AC
FEE 0.06 AC FEE 1.32 ACTLE 0.02 AC
FEE 0.02 ACFEE 0.01 AC
SLOPEINTERCEPTS
BEGIN RELOCATIONSTA 100+00.00Y = 167168.386X = 182192.662
POSITIONS SHOWN ON THIS PLAT ARE WISCONSIN COORDINATE REFERENCE SYSTEMCOORDINATES (WISCRS), PORTAGE COUNTY, NAD83 (2011), IN U.S. SURVEY FEET.VALUES SHOWN ARE GRID COORDINATES, GRID BEARINGS, AND GRID DISTANCES.GRID DISTANCES MAY BE USED AS GROUND DISTANCES.FOUND MONUMENTS INFORMATION SHOWN REPRESENTS TYPE AND LOCATION OFEXISTING MONUMENTS WITHOUT OPINION AS TO THEIR VALIDITY AND USE AS APROPERTY CORNER.FOR THE CURRENT ACCESS/DRIVEWAY INFORMATION, CONTACT THE PORTAGECOUNTY HIGHWAY DEPARTMENT.ALL NEW RIGHT-0F-WAY MONUMENTS WILL BE TYPE 2 (TYPICALLY 3/4" X 24" IRONREBARS), UNLESS OTHERWISE NOTED, AND WILL BE PLACED PRIOR TO THECOMPLETION OF THE PROJECT.ALL TLE'S ARE FOR SLOPE GRADING PURPOSES, UNLESS OTHERWISE NOTED.
58'
OL 3 OL 3
73'
66'89' PL PL
PLPLPL
PLPL25 26 11
66'
AT&TDOC. 11526150 AT&TDOC. 31487250 AT&TDOC. 31487250
AT&TDOC. 315513, 45008150WI PUBLIC SERVICECORP. - GASDOC. 50626351 XCEL ENERGY -ELECTRICDOC. 25016552
AT&TDOC. 315513, 45008150WI PUBLIC SERVICECORP. - GASDOC. 50626351XCEL ENERGY -ELECTRICDOC. 25016552
54
66'
180'
PL
ROAD NAMEBASIS OF EXISTING R/WYEAR1978PRAINWOOD ESTATES PLATCTH R / EISENHOWER RD/ BARBARA'S LN / JACK'SDR / SHADY DRCTH R / EISENHOWER RDWI STATUTE 82.31(2)1989PLAT OF RW PLOVER-WAUPACA CTY LINESTH 54
SIGN SIGN
Page 39 of 44
BORE111
MHWVS
WVMWVMWVM
(?)FO
(?)FO
(?)FO
(?)FO
(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO
SANSANWW
E EE E E E E E E E E E E E E E E E E E EE E E E E E E E
E E E FO FOFOFO FO FO FO FO FO FO FOFOFO FO FO FO FO FO FO FO FOFOFOFO
FO
FOG G G G G G GG G G G G G G G G G G G G
OH
OH
OH
OH
OH
OH
SEPV4251IP
4245IP4241IP
4269IP
130 135 140 145 150 155
311312325326 327328329330 331 332333334335336337
338339340341 358359113114 133130131
135136 134R/L= N00°13'43"W 4271IP4268IP4267IP4244IP4242IP4246IP4247IP
132
112
R/L= N00°06'30"ER/L= N00°13'43"W
4270IP
140137138139 PI 154+89.54
R/W STATION & OFFSET TABLEPOINT130131132133134135136137138139140
STATION154+21.00154+55.60154+88.60154+89.79154+92.34154+58.92141+83.58141+81.86141+81.62141+80.92154+21.09
OFFSET60.79' LT96.00' LT96.41' LT0.00' RT63.97' RT65.11' RT68.47' RT8.47' RT0.00' RT24.52' LT27.79' LT
TLE STATION & OFFSET TABLEPOINT325326327328329330331332333334335336337338339340341
STATION128+74.00128+84.00136+90.00136+90.00137+15.00137+15.00144+70.00152+25.00153+85.00154+27.10154+47.74154+44.00154+55.24154+61.86154+43.00151+59.00149+92.00
OFFSET54.08' LT59.00' LT68.00' LT72.00' LT72.00' LT68.00' LT64.14' LT60.28' LT60.70' LT67.00' LT88.00' LT115.00' LT198.00' LT150.00' RT78.00' RT80.00' RT66.34' RT
(?)FO(?)FOE EEEG G4251IP 110
MHWVMWVMWVM(?)FO
(?)FO
SANSANWWE EFOFOFO
FO
FO
G1554271IPR/L= N00°06'30"E
4270IP
PI 154+89.54
WISDOT/CADDS SHEET 75GRID FACTOR EHWY:COUNTY:CONSTRUCTION PROJECT NUMBERSTATE R/W PROJECT NUMBERDATEREVISION DATE 0SCALE, FEET PS&EPLOT NAME : FILE NAME : 8/11/2026 2:54 PMPLOT DATE :PLOT BY :SEH
44
PLAT SHEET SHEET X:\PT\P\PORTH\185422\4-prelim-dsgn-rpts\Civil 3D-CTH R\RW\DWG\040101-rp.dwgCTH RPORTAGE6808-03-706808-03-004.058-11-26N/A 200100
CTH R / EISENHOWER AVE
SHADY DRGREEN PASTURES TRLPLEASANT DR
SE-NESECTION 35SW-NWSECTION 36
NE-NESECTION 35NW-NWSECTION 36
LOT 1CSM 11077V 51, P57DOC 838791LOT 1CSM 8806V 36, P 36 A&B,DOC 671932
FOUND MONUMENTSDESCRIPTIONXYPOINT4241170544.022182871.2511 1/4" REBAR4242171044.116182792.2643/4" REBAR4244171634.079182788.7083/4" REBAR4245170477.964182870.9251 1/4" REBAR4246170462.862182856.3931 1/4" REBAR4247170342.321182857.1721" IP4267172092.873182785.7024268172320.675182784.2134271172388.511182848.0471" IP3/4" REBAR LEANING1" IP
TR353623N8E
TR2625353623N8E 4249FOUND HARRISON MONSTA 154+88.84, 27.97' LTY= 172351.836X= 182750.896
APPROXIMATEQUARTER LINE APPROXIMATE SIXTEENTH LINEAPPROXIMATE SECTION LINE
PL PL
PLPLPL
PL
PL
PLPL PLPLPL
PL
PLPL
PL PL PL PLPL PL PL
PL
HARVEST ACRESDOC 89192052 5453 HARVEST ACRESFIRST ADDITIONDOC 910626
13
14 1597969594939291
126'
66'
66'
66' 66'
66'
PLPLPLPLPLPLPL
PL
PLPLPLPL PL
MORNINGSTAR LN66' BB
SECTION LINE
MARY A HAMERSKISURVIVORS TRUST
CTY RINVESTMENT LLCMARLENE DUDA
TLE SLOPES 0.37 AC FEE 0.01 AC
TLE 0.08 ACFEE 1.44 ACFEE 0.31 ACTLE 0.05 AC
SLOPEINTERCEPTS
50COMPUTED POSITIONFROM TIESSTA 128+71.14, 21.07' LTY= 169734.180X= 182768.237
POSITIONS SHOWN ON THIS PLAT ARE WISCONSIN COORDINATE REFERENCE SYSTEM COORDINATES (WISCRS),PORTAGE COUNTY, NAD83 (2011), IN U.S. SURVEY FEET. VALUES SHOWN ARE GRID COORDINATES, GRID BEARINGS,AND GRID DISTANCES. GRID DISTANCES MAY BE USED AS GROUND DISTANCES.FOUND MONUMENTS INFORMATION SHOWN REPRESENTS TYPE AND LOCATION OF EXISTING MONUMENTSWITHOUT OPINION AS TO THEIR VALIDITY AND USE AS A PROPERTY CORNER.FOR THE CURRENT ACCESS/DRIVEWAY INFORMATION, CONTACT THE PORTAGE COUNTY HIGHWAY DEPARTMENT.ALL NEW RIGHT-0F-WAY MONUMENTS WILL BE TYPE 2 (TYPICALLY 3/4" X 24" IRON REBARS), UNLESS OTHERWISENOTED, AND WILL BE PLACED PRIOR TO THE COMPLETION OF THE PROJECT.ALL TLE'S ARE FOR SLOPE GRADING PURPOSES, UNLESS OTHERWISE NOTED.
PL
TLE 0.01 AC
TLE 0.02 AC
PL
PL
88'PLLOT 1CSM 837V 3, P 195,DOC 309119
PLPL
VILLAGEOF
PLOVER
13MARY A HAMERSKISURVIVORS TRUST
AT&TDOC. 315513, 45008150 AT&TDOC. 315513, 45008150 WISCONSIN PUBLIC SERVICE- ELECTRICDOC. 85546554
WISCONSIN PUBLIC SERVICE- ELECTRICDOC. 88611054 VILLAGE OF PLOVER - WATERDOC. 90558756
51
61 61
57 Y= 172352.645X= 182778.864
4251169557.988182737.0381 1/4" IP
51
54
25'WISCONSIN PUBLICSERVICE EASEMENT
SEE SHEET 4.04
SEE SHEET 4.06
ROAD NAMEBASIS OF EXISTING R/WYEAR2022HARVEST ACRES PLATCTH R / EISENHOWER RD/ SHADY DR
CTH RWI STATUTE 82.31(2)
2025HARVEST ACRES 1ST ADDCTH R / EISENHOWER RD/ GREEN PASTURES TRL2005CSM 8806, V. 36, P. 36 A&B, DOC. 671932CTH R / EISENHOWER RD2018CSM 11077,V. 51, P. 57, DOC. 838791CTH R / EISENHOWER RD1975CSM 837, V. 3, P. 195, DOC. 309119CTH R / EISENHOWER RD/ PLEASANT DR
PLEASANT DR
VARIES
40'RESERVED BUT NOTDEDICATED PERCSM 562,DOC. 296938
Page 40 of 44
SEPV
MH
MH
MH
MH
MH
MH
WVS
WVMWVMWVM WVMWVMWVM WVM WVMWVMWVMWVM
(?)FO
(?)FO
(?)FO
(?)FO
(?)FO
SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANW W W W W W W W W W W W W W W W W
WE E E E E E E E E E E E E E E E E EFO FOFO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FOFOFO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FOFOFO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FOFO
FO
FO FO FO FO FOG
G
G G G G G G G G G G G G G G G G G
OHOHOHOHOHOHOHOH
SEPV
4269IP
4279IP
4248IP
4281IP 4282IP4278IP155 160 165 170 175 1804272IP
333334335336337
338339 357358359133130131
1351344271IP4268IP132R/L= N00°06'30"ER/L= N00°13'43"W 4284IP4277IP4276IP4275IP4274IP4273IP160161
4270IP
4283IP4280IP
140PI 154+89.54
R/W STATION & OFFSET TABLEPOINT160161STATION157+09.00157+09.00OFFSET27.34' LT0.00' RTTLE STATION & OFFSET TABLEPOINT357358359STATION157+09.00156+50.00155+25.80OFFSET69.66' RT75.00' RT75.00' RT
MHWVSWEFO FOFOFOFOGG
SEPV
4269IP
15542714268IPR/L= N00°13'43"W
WISDOT/CADDS SHEET 75GRID FACTOR EHWY:COUNTY:CONSTRUCTION PROJECT NUMBERSTATE R/W PROJECT NUMBERDATEREVISION DATE 0SCALE, FEET PS&EPLOT NAME : FILE NAME : 8/11/2026 2:55 PMPLOT DATE :PLOT BY :SEH
44
PLAT SHEET SHEET X:\PT\P\PORTH\185422\4-prelim-dsgn-rpts\Civil 3D-CTH R\RW\DWG\040101-rp.dwgCTH RPORTAGE6808-03-706808-03-004.068-11-26N/A 200100
CTH R / EISENHOWER AVEPLEASANT DR
PLEASANT DR
AUGUSTA CTTORREY PINES WAY
PEAR LNJUNEBERRY RDSE-SESECTION 26
SW-SWSECTION 25
NW-SWSECTION 25NE-SESECTION 26
LOT 1CSM 011809DOC 900319LOT 2CSM 011809DOC 900319
GREEN TREE FARM PLAT
OUTLOT 1 CSM 9042V 37, P 122 & ADOC 686281
VILLAGE WOODPOINTE
31 25
20 1 2 3
FOUND MONUMENTSDESCRIPTIONXYPOINT4268172320.675182784.2134248173564.017182723.6753/4" REBAR LEANING1" IPROAD NAMEBASIS OF EXISTING R/WYEAR2016VILLAGE WOOD POINTE PLATCTH R / EISENHOWER RD,TORREY PINES WAY
CTH RWI STATUTE 82.31(2)
2016VILLAGE WOOD POINTE 1ST ADDCTH R / EISENHOWER RD2026GREEN TREE FARM PLATCTH R / EISENHOWER RD,PEAR LN4269172330.515183058.9193/4" REBAR4270172396.627183057.8053/4" REBAR4271172388.511182848.0471" IP4272172575.285182848.9841" IP4273172753.341182849.7271" IP4274172871.780182850.3331" IP4275172925.441182850.6531" REBAR4276173234.018182851.8933/4" REBAR4277173299.936182852.4723/4" REBAR4278173300.013182880.6671 1/4" REBAR4279173445.820182853.0243/4" REBAR4280173605.878182853.6833/4" REBAR4281173680.319182854.2163/4" REBAR4282174090.263182856.0263/4" REBAR W/ CAP4283174342.627182857.1683/4" REBAR W/ CAP4284175004.879182860.3121" IP
TR2625353623N8E
TR262523N8E 51COUNTY COORDSSTA 181+38.33, 20.41' RTY= 175001.469X= 182763.454
VILLAGE WOODPOINTE 1ST ADDITION
282930 19
CSM 11023, V. 51,P. 3, DOC. 834041CSM 9042, V. 37,P. 122-122A, DOC. 686281CSM 011809, DOC. 900319201720062023CTH R / EISENHOWER RDCTH R / EISENHOWER RDCTH R / EISENHOWER RD
272625242322212019 181766'
66'
130'
66'
66'
66'
130'
BB B B B B BB B BAPPROXIMATE SECTION LINE
SECTION LINE
APPROXIMATE SIXTEENTH LINE
APPROXIMATE SIXTEENTH LINE
APPROXIMATE QUARTER LINE
PL
PLPLPL PLPL
PL
PL
PL
PL PL PL PL
PLPLPLPLPL PLPL
PLPLPL PLPLPL
PL
PL PL PL PL
PL
PLPL PL17GALE M &PAUL R KIRBY27 CSM 11023V 51, P 3DOC 834041TRANS 233RESTRICTIONS APPLY
PLE PERDOCUMENT #922998TLE PER DOCUMENT #922998
TLE SLOPES 0.02 AC
SLOPEINTERCEPTS
4249FOUND HARRISON MONSTA 154+88.84, 27.97' LTY= 172351.836X= 182750.896
POSITIONS SHOWN ON THIS PLAT ARE WISCONSIN COORDINATE REFERENCE SYSTEM COORDINATES (WISCRS),PORTAGE COUNTY, NAD83 (2011), IN U.S. SURVEY FEET. VALUES SHOWN ARE GRID COORDINATES, GRID BEARINGS,AND GRID DISTANCES. GRID DISTANCES MAY BE USED AS GROUND DISTANCES.FOUND MONUMENTS INFORMATION SHOWN REPRESENTS TYPE AND LOCATION OF EXISTING MONUMENTSWITHOUT OPINION AS TO THEIR VALIDITY AND USE AS A PROPERTY CORNER.FOR THE CURRENT ACCESS/DRIVEWAY INFORMATION, CONTACT THE PORTAGE COUNTY HIGHWAY DEPARTMENT.ALL NEW RIGHT-0F-WAY MONUMENTS WILL BE TYPE 2 (TYPICALLY 3/4" X 24" IRON REBARS), UNLESS OTHERWISENOTED, AND WILL BE PLACED PRIOR TO THE COMPLETION OF THE PROJECT.ALL TLE'S ARE FOR SLOPE GRADING PURPOSES, UNLESS OTHERWISE NOTED.
PLTOWNOFPLOVERVILLAGE
OF PLOVER
28 3940414243444546
PL
PL PLPL
PLPLPL PL
LOT 1CSM 7651V 28, P 131 & A,DOC 586762
2001CSM 7651, V. 28, P. 131 & A, DOC. 586762CTH R / EISENHOWER RD
181716 4243233 34 PLPL PLPL PL
AMHERST TELEPHONE CO.DOC. 827082, 827252, 81877957
LIMITED PERMANENT EASEMENTAGREEMENT DOC. 9247982026CTH R / EISENHOWER RD,PLEASANT DR
Y= 172352.645X= 182778.864
USGS MONITORING WELLSEE SHEET 4.05 SEE SHEET 4.07
Page 41 of 44
GUYGUYWELL
ELELELELELGUYGUYWVM
MH
MH
MH
MH
MH
MHWVM
WVM
WVMWVM WVMWVMWVMWVM WVM WVM
E
(?)FO(?)FO(?)FO(?)FO
(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO(?)FO E E
E
E E EE E E
E
EE
GGGGG
SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANW W W W W W W W W W W W W W WE
EE E E E E EFO FO FO FO FO FO FO FO FO FO FO FO FO FO FOFO FO FO FO FO FO FO FO FO FO FO FO FO FO FOFO FO FO FO FO FO FO FO FO FO FO FO FO FOG G
G G G G G G G G G G G G G G G
OHOHOHOHOHOHOHOH4286IP
207
185 190 195 200 205370371372373374
375376377378379380381382383
384385
386 400401R/L= N04°05'35"ER/L= N01°27'31"ER/L= N00°21'50"E
PI 192+52.82Y = 176115.919X = 182785.972
PI 198+91.49Y = 176752.967X = 182831.557
PI 202+91.98Y = 177153.324X = 182841.751
4284IP 4288IPR/L= N00°06'30"E 4289IP4290IP4285IP4287IP
EP 207+95.36Y= 177656.696X= 182844.947
TLE STATION & OFFSET TABLEPOINT370371372373374375376377378379380381382383384385386
STATION195+77.00196+05.00197+47.00198+99.00199+21.00205+60.00204+81.00203+92.00201+50.00196+17.00196+05.00194+73.00194+73.00183+90.00183+53.07183+02.82182+78.00
OFFSET69.31' LT79.00' LT92.00' LT97.00' LT90.11' LT59.98' RT73.00' RT73.00' RT48.80' RT59.68' RT70.00' RT70.00' RT67.72' RT77.77' RT159.00' RT153.00' RT77.25' RT
R/W STATION & OFFSET TABLEPOINT400401STATION205+60.00205+60.00OFFSET64.02' LT0.00' RT
WISDOT/CADDS SHEET 75GRID FACTOR EHWY:COUNTY:CONSTRUCTION PROJECT NUMBERSTATE R/W PROJECT NUMBERDATEREVISION DATE 0SCALE, FEET PS&EPLOT NAME : FILE NAME : 8/11/2026 2:55 PMPLOT DATE :PLOT BY :SEH
44
PLAT SHEET SHEET X:\PT\P\PORTH\185422\4-prelim-dsgn-rpts\Civil 3D-CTH R\RW\DWG\040101-rp.dwgCTH RPORTAGE6808-03-706808-03-004.078-11-26N/A 200100
CTH R / EISENHOWER AVE
CLEARVIEW CT
CTH R
SE-NESECTION 26SW-NWSECTION 25
NW-NWSECTION 25NE-NESECTION 26
16
HOMESTEAD FOREST
LOT 1 CSM 9022V. 37, P. 102DOC. 684814 LOT 1 CSM 9022V. 37, P.102DOC. 684814
FOUND MONUMENTSDESCRIPTIONXYPOINT1" REBAR1" IPROAD NAMEBASIS OF EXISTING R/WYEAR2009HOMESTEAD FOREST PLATCTH R / EISENHOWER RDCTH RWI STATUTE 82.31(2)2006CSM 9022, V.37, P. 102, DOC. 684814CTH R / EISENHOWER RD1" IP1 1/4" REBAR3/4" REBAR LEANING3/4" REBAR3/4" REBAR
4284175004.879182860.312
TR262523N8E
TR2324262523N8E 4291FOUND X IN CONCRETESTA 207+92.63, 63.96' LTY= 177656.407X= 182780.985
428542864287428842894290175162.983182861.295175371.096182862.780175213.416182861.647176416.051182869.415177082.689182888.874177232.411182902.103
21 22
16
130'
50'
157'PL PL
PL
PL PL
PL
PLPL
PL
PL
PL
APPROXIMATE QUARTER LINE
APPROXIMATE SIXTEENTH LINEAPPROXIMATE SECTION LINESECTION LINE
155'
22JAMESDINKINSSANKEYACRES LLC SANKEY ACRES LLC
DEL MONTE FOODSCORPORATION II INCTLE 0.07 AC
TLE 0.02 ACTLE 0.04 AC
TLE 0.02 AC
SLOPEINTERCEPTS
51COUNTY COORDSSTA 181+38.33, 20.41' RTY= 175001.469X= 182763.454
TLE 0.08 AC
POSITIONS SHOWN ON THIS PLAT ARE WISCONSIN COORDINATE REFERENCE SYSTEM COORDINATES (WISCRS),PORTAGE COUNTY, NAD83 (2011), IN U.S. SURVEY FEET. VALUES SHOWN ARE GRID COORDINATES, GRID BEARINGS,AND GRID DISTANCES. GRID DISTANCES MAY BE USED AS GROUND DISTANCES.FOUND MONUMENTS INFORMATION SHOWN REPRESENTS TYPE AND LOCATION OF EXISTING MONUMENTSWITHOUT OPINION AS TO THEIR VALIDITY AND USE AS A PROPERTY CORNER.FOR THE CURRENT ACCESS/DRIVEWAY INFORMATION, CONTACT THE PORTAGE COUNTY HIGHWAY DEPARTMENT.ALL NEW RIGHT-0F-WAY MONUMENTS WILL BE TYPE 2 (TYPICALLY 3/4" X 24" IRON REBARS), UNLESS OTHERWISENOTED, AND WILL BE PLACED PRIOR TO THE COMPLETION OF THE PROJECT.ALL TLE'S ARE FOR SLOPE GRADING PURPOSES, UNLESS OTHERWISE NOTED.
TOWNOF
PLOVER
254
PLPLPL
VILLAGE OF PLOVER - WATERDOC. 693223, 71029556 VILLAGE OF PLOVER - SANITARYDOC. 693223, 71029558
AT&TDOC. 693619, 703247, 42543150
575451 5754 575458
VILLAGEOF
PLOVER
END RELOCATIONSTA 206+00.00Y = 177461.337X = 182843.707SEE SHEET 4.06
CTH B / PLOVER RD
149'CTH B / PLOVER RD
Page 42 of 44
Portage County 800 Plover Road
Highway Department Plover, WI 54467
Nathan Check, PE Phone: 715-345-5355
Commissioner Fax: 715-345-5356
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patr ol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assista nt Patrol Manager – Bob Lang
Finance Office Supervisor – Stacy Zerby Financia l Associate III – Kristen Hancock
Date: August 12, 2026
To: Highway Committee
From: Nathan Check, P.E.
Subject: Discussion on 2027 Highway Department Budget
Background:
The budget guidelines have been issued and the Highway Department has its budget hearing
scheduled with Finance and the County Executive on August 27
th . The Highway budget is still
a work in progress as final allocations for insurance and other items have not been finalized but
attached is a high-level overview of the major accounts.
Analysis and Fiscal Impact:
Special Revenue Summary – Below is a summary of the overall anticipated bud get request for
Special Revenue(County road/bridge related work).
- Staffing –Wages are anticipated to be increased by 3% plus a step for all employees per
the budget guidelines. We will also continue to add funding for CDL training in the event
we need to hire a new employee without one, or we will begin to start sending employees
with Class B CDL’s to get their Class A CDL’s.
- 2027 Preservation – Work includes approximately 51 miles of crackfilling, chipsealing,
and wedging. Pavement repairs such as wedging, overlays, and bridge maintenance will
also be budgeted.
- 2027 Construction and Paving –. The original plan f or the next reconditioning and
resurfacing project for 2027 would be CTH T(CTH B to STH 161). This may change if
CTH A(STH 161 to CTH Z) is not selected in the WisDOT Surface Transportation
Program-Rural. Staff had submitted the application for CTH A last October which would
complete the entire corridor between STH 161 and STH 66 as the northern portion was
selected for STP funds and will be constructed in 2029.
Additional paving projects may include an overlay on CTH D from I39 to CTH J which
would also include paved shoulders.
Structures are also being evaluated as both CTH E and CTH A structures have not been
selected for funding under the WisDOT’s initial Local Small Structure program.
- 2027 Design – The budget includes design funds for the CTH T corridor and multiple
carried over local share design costs for the STP projects-CTH R and CTH A..
- Wetland project – Funds will be accounted for in a separate County account.
Page 43 of 44
Portage County 800 Plover Road
Highway Department Plover, WI 54467
Nathan Check, PE Phone: 715-345-5355
Commissioner Fax: 715-345-5356
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patr ol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assista nt Patrol Manager – Bob Lang
Finance Office Supervisor – Stacy Zerby Financia l Associate III – Kristen Hancock
- 2027 General and Winter Maintenance– General mainte nance is expected to increase
slightly for wages, equipment, and material inflation.
- Vehicle Registration Fee – 2027 is scheduled to be a borrowing year for the improvement
program and the $1.74M of revenue from the fee would be saved and reserved for 2028
projects.
- Revenues –
o Tax Levy – Estimated as flat from 2026.
o General Transportation Aids(GTA) – Estimated flat f rom 2026.
o Debt– Estimate will be provided as projects are fin alized.
o Carryover – There are carryover funds that will not be expended in 2026 include
the CTH O bridge and CTH A and R STP designs
o Grants – We estimated approximately $369,000 of Cou nty Highway Improvement
Program-Discretionary funding to help offset the costs of the CTH T project. In
addition to the CTH A(STH 161 to CTH Z) project application, we are also
waiting to hear from WisDOT on our Local Bridge Assistance application for the
CTH O overlay project.
- Bridge/Culvert Aid – Applications from towns are du e August 21 st which will be brought
to the September Committee meeting for approval.
Enterprise Summary – The Machinery Operations budget is projected to have small increases to
the expenses for labor and parts which would be offset by the DOT equipment rates. The 2027
equipment purchases will be brought to a future meeting for approval.
Recommendation:
Staff recommends that the Committee provide input on the budget. As final allocations are
received and budget details are entered, staff will provide additional information for the
Committee.