RecordWell Data

Public Works Committee — Agenda packet

Village of Hortonville · Outagamie County · Public Works Committee · meeting of Nov 5, 2026 · Agenda packets

Open the original document More from Village of Hortonville

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

VILLAGE OF HORTONVILLE AGENDA OF THE PUBLIC WORKS COMMITTEE November 5th, 2026, 5:00 P.M. Municipal Service Center 531 N Nash St. AGENDA 1. Call to Order 2. Preregistered Citizens to be heard. – LIMIT 5 MINUTES A. State name and address B. Comments to be limited to 5 minutes C. Pursuant to WI Statutes 19.83(2) and 19.84(2), The Board’s role is to listen to public comments, and not to ask questions, discuss, or take action regarding pre-registered citizens’ comments. 3. Approval of 6-18-26 minutes 4. Discussion on snow and ice removal on downtown sidewalks 5. Discussion on Public Works CIP equipment 6. Any other topics for future discussion 7. Comments and suggestions from citizens present 8. Adjourn Requests from people with disabilities who need assistance to participate in this meeting or hearing should be made to the Village Administration Office at 779-6011 with as much advance notice as possible. Posted: November 3rd, 2026 Jane Booth, WCMC Clerk-Treasurer VILLAGE OF HORTONVILLE MINUTES OF THE PUBLIC WORKS COMMITTEE June 18, 2026, 5:00 P.M. Municipal Service Center 531 N Nash St. MEETING MINUTES Chairperson Jim Moeller called the meeting to order at 4:59 p.m. in the Community Center at 531 N. Nash St., Hortonville, Wisconsin. Members present: President Jeanne Bellile, Trustees Jim Moeller, Julie Arendt Vanden Heuvel, Dalton Davis, and Therese Abitz Members excused: Officials/Staff present: Administrator Nathan Treadwell, Director of Public Works Aaron Steber and Utility Clerk Kaytlin Hooyman 1. Call to Order 2. Preregistered Citizens to be heard. – LIMIT 5 MINUTES A. State name and address B. Comments to be limited to 5 minutes C. Pursuant to WI Statutes 19.83(2) and 19.84(2), The Board’s role is to listen to public comments, and not to ask questions, discuss, or take action regarding pre-registered citizens’ comments. 3. Approval of 3-5-26 minutes Public Works Meeting Minutes a. Trustee Arendt Vanden Heuvel asked to change wench to wrench b. Motion Trustee Moeller & Trustee Arendt Vanden Heuvel to approve March 5, 2026, minutes. Unanimous voice vote motion carried. 4. Discussion on Snow Removal Operations a. Trustee Arendt Vanden Heuvel requested that they update everyone since the board had acquired new members since March 2026. Trustee Moeller stated that we would have the trail and Administrator Treadwell stated that it would be an excellent opportunity to test our equipment. Trustee Arendt Vanden Heuvel stated that Veteran’s Park is included as well. Administrator Treadwell agreed but defined that it was not a large part of the Veteran’s Park. Trustee Arendt Vanden Heuvel asked what the priority of snow removal was. Director of Public Works Steber answered with downtown being the priority with the trail being the second. Trustee Moeller inquired that it was about 40-50 ft stretch and is questioning if it is warranted to buy for such a short stretch. Trustee Arendt Vanden Heuvel pointed out that the equipment would have multiple uses and moved the conversation to looking at the snow removal processes of surrounding municipalities such as Greenville. She would like Hortonville to put in place a snow removal policy in the future as well. Director Steber stated that with the East side of town being pushed back with construction timelines, we can table this and wait until 2027 budget. Trustee Arendt Vanden Heuvel asked about a gator versus a UTV, and which would have more uses. Public Works Employee Hunter Gruenwald informed everyone that they currently hand salt and time is getting to be a concern. If they had a gator, it would have the attachment option of a larger salter. Trustee Arendt Vanden Heuvel added that a gator would be safer as well than what is currently being used and hand salting. Hunter Gruenwald agreed, adding that gator’s have better lighting. Trustee Arendt Vanden Heuvel asked where the money for this purchase was coming from again and Director Steber stated that $60,000 was dedicated from the Public Works for this year 2026. 5. Discussion on Public Works 2006 F150 a. Director of Public Works Steber started out by saying that they received an additional quote for the truck and it costs roughly the same amount as the previous quote to fix the transmission. This has moved up in priority as if an additional truck broke down the Public Works Department would be in trouble equipment wise. He went on to state that the sale of the 2006 Ford and bucket truck would assist in the purchase of a new vehicle with a new plow. This would help the Public Works Department be more efficient as we are down to 2 trucks with 7 guys. The new truck would also assist with locates and we could get rid of other equipment that is no longer needed. Eventually a lift trailer would be a good purchase as well. Trustee Arendt Vanden Heuvel asked if the last truck purchase was that of a Dodge. Public Works Employee Hunter Gruenwald stated that the quote they received was for a Dodge due to it being historically easier to fix and maintain. Trustee Arendt Vanden Heuvel asked why the quote was for a red Dodge to which Hunter Gruenwald replied that was just for image purposes and a different color is available in stock. Trustee Moeller asked if we could get multiple quotes instead of just the one for the Dodge. Trustee Arendt Vanden Heuvel also asked for a quote on a white vehicle for identification purchase as the Village could stay uniform. Trustee Moeller asked about the benefits of a UTV versus a new F150 versus a new Chevy Silverado. Plows exist for light duty trucks as well. Administrator Treadwell pointed out that Public Works would not be taking a vehicle down the sidewalks of Main Street. Trustee Moeller questioned the size of an UTV versus a vehicle as they are similar in widths. He also questioned whether this would leave the Public Works Employees still having to hand salt multiple locations. Director Steber stated that they would be salting with the gator. Trustee Arendt Vanden Heuvel asked for additional quotes besides the single quote on the Dodge. Hunter Gruenwald replied that he would take care of that request. Trustee Arendt Vanden Heuvel questioned how the spreadsheet worked that they were pulling the vehicle information from. Administrator Treadwell stated that it is a spreadsheet that lists all vehicles available for purchase. Trustee Moeller asked again about a lighter truck than an F150 or Dodge. Director Steber reminded everyone that we need a plow, reason being if we are down to one truck with a plow this would cause a huge workload. Trustee Arendt Vanden Heuvel asked for access to the spreadsheet to view it herself. Director Steber said he would send it over. Administrator Treadwell advised that they followed the same process as they did for the Police Department. President Bellile asked if we currently use all the trucks we already have in inventory. Trustee Moeller added in asking if we utilize them everyday as well. Hunter Gruenwald informed both that all current vehicles in inventory are used daily except the old squad car, as it is left up by the Municipal Building for Administration use and the bucket truck. We in fact have one employee without a truck. Trustee Arendt Vanden Heuvel stated that the bucket truck is in fact unsafe as well. Trustee Davis inquired about how many plows we currently have in inventory and Director Steber stated that we currently have two. Trustee Moeller asked what time frame in hours it currently takes the Public Works to plow now, Hunter Gruenwald said 4-5 hours. Trustee Abitz stated that in the past business owners on Main Street have shoveled their section of the sidewalk and salted as well. Trustee Arendt Vanden Heuvel questioned if she was suggesting that business owners do their own shoveling and salting by a designated time. Administrator Treadwell said that we are unable to set a designated time due to when businesses have their opening hours set. Trustee Arendt Vanden Heuvel asked which option was easier for everyone, business owners or Public Works Employees? Hunter Gruenwald stated that our current process is a good process but that they currently clear the areas early to avoid traffic abundance. Trustee Abitz stated that business owners still are taking care of it and inquired about having salt buckets placed on Main Street and Hunter Gruenwald reminded that the salt clumps when left out. Trustee Abitz asked if when the construction is finished if the sidewalks would be scraped better. Hunter Gruenwald replied with hopes of improvement. Trustee Arendt Vanden Heuvel stated that she would like DPW Employees to continue to take care of snow removal. Trustee Abitz asked if DPW Employees would be circling back if business owners chose to shovel after Main Street had been cleared the first time as it is not being completed as good as it has been in the past requiring business owners to shovel after DPW Employees. Director Steber informed everyone that we have had warm winters which cause freezing then thawing and refreezing making it difficult for DPW Employees to scrape down to the sidewalk entirely. President Bellile encouraged to make it through this winter and hopefully next will be better with the new construction completion. Trustee Arendt Vanden Heuvel added that we can learn from this next year and downtown as well. Administrator Treadwell also added saying that different types of snowfall require different efforts of clean-up. Trustee Moeller switched the topic and stated that all the information was confusing and he would like to see additional quotes requesting that vehicles be grouped by use or by season. Trustee Arendt Vanden Heuvel reminded that all the data was there but that it may just be in a different format and suggested that it could be sent digitally so Trustee Moeller could alter it to fit his personal needs. Director Steber asked if everyone was in favor of selling the surplus and the bucket truck as well. Trustee Arendt Vanden Heuvel stated if it was not posted to Facebook on a personal page due to it causing confusion in the Village. Trustee Davis inquired if the bucket truck was worth fixing and Administrator Treadwell stated that it had been fixed multiple times and it is now past repair with cost effectiveness. Trustee Arendt Vanden Heuvel also added that it has been on the repair list for over 10 years and has been red tagged for some time now. Trustee Arendt Vanden Heuvel then started to wrap up the conversation by requesting a snow removal policy. Trustee Abitz asked if we could just photocopy Greenville’s and Trustee Arendt Vanden Heuvel stated no but that it was a great starting point. 6. Discussion on Public Works/Utility Truck Replacement a. Included in the above conversation 7. Discussion on purchase of Trail Snow Removal Equipment a. Included in the above conversation 8. Any other topics for future discussion a. May revisit all topics discussed above b. Trustee Arendt Vanden Heuvel asked to discuss a potential snow removal process 9. Comments and suggestions from citizens present a. Public Works Employee Hunter Gruenwald added that a bigger truck would help support a larger salter as well if need be. Trustee Moeller stated that he was not opposed to any of the discussion but that he would rather have some time to better understand everything. Administrator Treadwell offered the opportunity for anyone to tour/visit the Public Works Department/Water Treatment Plant for further understanding and use/view of all equipment in inventory. Administrator Treadwell further encouraged everyone to take the time to tour/visit at least once. If interested, reach out to Director of Public Works Steber to set up a time. 10. Adjourn a. Motion Trustee Davis & Trustee Arendt Vanden Heuvel to adjourn. Unanimous voice vote, motion carried. The Public Works Committee adjourned at 5:50 p.m. Minutes Submitted by, Kaytlin Hooyman Public Works Clerk Quotation Number: JL2063046 Quote Sent Date: Oct 07, 2026 Expiration Date: Nov 06, 2026 Prepared By: Joe Lowney Phone: 920-538-0504 Email: jlowney22@hotmail.com Customer Village of Hortonville Phone: 6122967348 Contact Aaron Steber Phone: 6122967348 Email: dpw@vohortonville.com Dealer Spiegelberg Implement, Inc., Weyauwega, WI Item Name Item Number Quantity Total Bobcat UW56 M1225 1 67,513.82 Standard Equipment: Adjustable Vinyl Seats All-Wheel Steer Automatically Activated Glow Plugs Auxiliary Hydraulics Variable Flow with dual direction detent Beverage Holders Bob-Tach Boom Float Cargo Box Support Cruise Control Speed Management Enclosed Cab with HVAC Dual Port USB charger Lower Engine Guard Limited Slip Transaxle Engine and Hydraulic Monitor with Shutdown Front LED Work Lights Full-time Four-Wheel Drive Machine Warranty: 12 Months, unlimited hours Bobcat Engine Warranty: Additional 12 Months or total of 2000 hours after initial 12 month warranty Horsepower Management Roll Over Protective Structure (ROPS) . Meets Requirements of SAE-J1040 & ISO 3471 Falling Object Protective Structure (FOPS) . Meets Requirements of SAE-J1043 & ISO3449, Level I Dome Light Hydraulic Dump Box Instrumentation: Standard 5" Display with Keyless Start, Engine Temperature and Fuel Gauges, Hour meter, RPM and Warning Indicators. Includes maintenance interval notification, fault display, job codes, quick start, and security lockouts. Joystick, Manually Controlled with Lift Arm Float Lift Arm Support Parking Brake, automatic Power Steering with Tilt Steering Wheel Radiator Screen Rear Receiver Hitch Seat Belts, Shoulder Harness Spark Arrestor Muffler Suspension, 4-wheel independent Toolcat Interlock Control System (TICS) Two-Speed Transmission Attachment Control M1225-R08-C02 1 229.91 Heavy Duty Battery M1225-R07-C02 1 94.30 Deluxe Road Package M1225-P01-C01 1 2,655.22 Deluxe Road Package includes: Backup Alarm, Turn Signals, Flashers, Tail Lights, Brake Lights, Rear view mirror, Side Mirrors, Horn, Rear work lights, and headlights Engine Block Heater M1225-A01-C02 1 130.93 High Flow Package M1225-R03-C02 1 1,773.00 Interior Trim M1225-A01-C04 1 184.70 Power Bob-Tach M1225-R14-C03 1 1,033.41 Radio Option M1225-R15-C02 1 484.75 Rear View Camera M1225-R20-C01 1 321.87 Traction Control M1225-R16-C02 1 568.92 29 X 10.5 Trac Tire M1225-R05-C04 1 587.62 74" Standard Duty Bucket 7272768 1 1,250.78 2.5K Standard Duty Pallet Fork Frame 7297499 1 479.10 42" 2.5k Standard Duty Pallet Fork Teeth 7308798 1 363.41 68" Angle Broom 7337703 1 6,657.44 Snow Blower 32X74 M7045 1 7,255.29 MOTOR PACKAGE 130CC (22-28 gpm) M7045-R01-C03 SP13 Sand and Salt Spreader 7453395 6415.53 Box Stake Pocket 7190021 Government Rebate: US Q4 2026 1 4,300.00 - 4,300.00 Total for Bobcat UW56 93,700.00 Quote Total 93,700.00 Customer Acceptance: Quotation Number: JL2063046 Purchase Order: ___________________________________ Authorized Signature: Print: _______________________________ Sign: _____________________________________________________________ Date:_____________ Email:________________________________________________________ Tax Exempt: Y ▢ / N ▢ W9614 State Highway 96 P.O. Box 170 920-779-4311 From the desk of: Shorty Miller Construction Equipment Sales Consultant Dale, Wisconsin 54931 shorty.miller@servicemotor.com Cell: 920-585-1346 www.servicemotor.com 10/12/2026 Village of Hortonville 531 N. Ash Street Hortonville WI. 54944 Listed below are the spcifications and pricing on the equipment we discussed. Land Pride AP-SBL2574 Working Width : 74" Hitch: Universal Quick Attach Main Housing Material: 10 Gauge Side Plate Material: 3/16" Impeller Diameter: 74 24" Impeller Housing Depth: 74 8" Impeller Blades: 4 Auger Diameter: 74: 16" Auger Paddles: 4 Chute Opening at Base: 74 10" Chute Rotation: Sprocket Type; Hydraulic Chute Deflector Operation: Hydraulic Motors: ; 20-26 GPM; 27- 30-60 Hydraulic HP Skid Shoes: Outer, Adjustable & Replaceable Case Drain Standard AP-SBL2574-11-20-32-40-50 1062# $ 12,041 25 SERIES SNOW BLOWER, 20-26 GPM MOTOR, SMALL FF COUPLERS, 14 PIN WIRING HARNESS, CASE DRAIN COUPLERS, OUTER SKID SHOES MSRP $ 12,041.00 Dealer prep $330.00 Total $12,371.00 Less discount ($1,855.00) Sell Price $9,815.00 W9614 State Highway 96 P.O. Box 170 920-779-4311 From the desk of: Shorty Miller Construction Equipment Sales Consultant Dale, Wisconsin 54931 shorty.miller@servicemotor.com Cell: 920-585-1346 www.servicemotor.com Land Pride AP-SBL2584 snow blower Working Width :84" Hitch: Universal Quick Attach Main Housing Material: 10 Gauge Side Plate Material: 3/16" Impeller Diameter: 84: 24" Impeller Housing Depth:84: 8" Impeller Blades: 4 Auger Diameter: 84: 16" Auger Paddles: 4 Chute Opening at Base: 84: 10" Chute Rotation: Sprocket Type; Hydraulic Chute Deflector Operation: Hydraulic Hydraulic motor 27-33 GPM 30-60 Hydraulic HP Skid Shoes: Outer, Adjustable & Replaceable * Case Drain Standard SMC sell price $10,315.00 Land Pride AP-SBL3084 snow blower Working Width: 84” Hitch: Universal Quick Attach Main Housing Material: 10 Gauge Side Plate Material: 1/4” Impeller: 26” Diameter x 6-1/2” Deep Impeller Blades: 5 Auger: 16” Diameter, Serrated Chute Opening at Base: 10” Chute Rotation: Sprocket Type; Hydraulic Chute Deflector Operation: Hydraulic Optional Fold-Over Chute Standard Bolt-on Wings Hydraulic motor 27-33 GPM Skid Shoes: Outer, Bolt-on, Adjustable & Replaceable SMC sell price $12,932.00 Land Pride AP-SBL3584 Working Width: 84” Hitch: Universal Quick Attach High-Flow 34-41 GPM Motor Main Housing Material: 10 Gauge Side Plate Material: 1/4” W9614 State Highway 96 P.O. Box 170 920-779-4311 From the desk of: Shorty Miller Construction Equipment Sales Consultant Dale, Wisconsin 54931 shorty.miller@servicemotor.com Cell: 920-585-1346 www.servicemotor.com Impeller: 26” Diameter x 6-1/2” Deep Impeller Blades: 5 Auger: 16” Diameter, Serrated Chute Opening at Base: 10” Chute Rotation: Sprocket Type; Hydraulic Chute Deflector Operation: Hydraulic Standard Bolt-on Wings Skid Shoes: Outer, Bolt-on, Adjustable & Replaceable * Case Drain Standard SMC sell price $12,657.00 Erskine SB360X-96-32-43 snow blower Working Width: 96” Hitch: Universal Quick Attach High-Flow 32-42 GPM Motor Main Housing Material: 10 Gauge Side Plate Material: 1/4” Impeller: 24” Diameter Impeller Blades: 4 Auger: 17” Diameter, serrated Chute Rotation: Sprocket Type; Hydraulic Chute Deflector Operation: Hydraulic Skid Shoes: Outer, Bolt-on, Adjustable & Replaceable SMC sell price $13,530.00 Case SV280 Rubber tire skid steer 74HP FPT diesel engine 2800 pound lift capacity E-H controls Cab with heat, air conditioning Cloth Air ride seat W9614 State Highway 96 P.O. Box 170 920-779-4311 From the desk of: Shorty Miller Construction Equipment Sales Consultant Dale, Wisconsin 54931 shorty.miller@servicemotor.com Cell: 920-585-1346 www.servicemotor.com E-H cab LCD display Reverse camera Standard flow auxiliary hydraulics (24.2 GPM) High Flow auxiliary hydraulics (37.2 GPM) Hydraulic quick coupler for loader attachments DEMO door Rear Object Detection Yellow warning light on cab 78” HD dirt bucket with bolt on cutting edge 12 x 16.5 severe duty tires Discount sell price $62,950.00 Trade in Kubota SSV75 ($32,950.00) Trade price $30,000.00 If you have any questions, feel free to contact me. Thank you Make it a great day Above prices are good for 14 days. Tow-Behind Truck Loader

Source: Village of Hortonville website. First collected Nov 8, 2026.