Packet
Village of Cottage Grove · Dane County · meeting of Nov 11, 2026 · Agenda packets
Open the original document More from Village of Cottage Grove
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
VILLAGE OF COTTAGE GROVE
NOTICE OF PUBLIC MEETING
Public Works, Properties & Sustainability Committee
Wednesday, November 11, 2026
5:30 p.m.
This meeting will take place as a hybrid meeting both virtually via Zoom and in person at Village
Hall at 221 E. Cottage Grove Road. If you are utilizing Zoom, please join the meeting from your
computer, tablet or smartphone by visiting https://us06web.zoom.us/j/81667308771?
pwd=NzL458EUYau7KdOkEcyt4z8fwsNoCp.1. You can also participate via phone by dialing 1 312
626 6799 and use Meeting ID 816 6730 8771# When asked for your Participant ID, just press #,
when asked for the Passcode enter 221.You may also choose to participate by providing public
comment prior to the meeting via email to Village Clerk Lisa Kalata: lkalata@village.cottage-
grove.wi.us. If this is a teleconference, virtual or hybrid meeting, please review the Village of
Cottage Grove’s policy.
Call Meeting To Order
Determination Of Quorum And That The Agenda Was Properly Posted
PUBLIC APPEARANCES-Public's Opportunity To Speak
Discuss And Consider The Minutes Of The Public Works, Properties & Sustainability
Committee Meeting Of October 14, 2026.
10-14-26 PW MINUTES.PDF
Unfinished Business
Discuss The Recommendation To Village Board The Traffic Control And Residential
Traffic Calming Policy And Application.
RESIDENTIAL TRAFFIC CALMING POLICY.NOVEMBER.PDF
RESIDENTIAL TRAFFIC CONCERN AND TRAFFIC CALMING REQUEST
APPLICATION.PDF
Consider The Recommendation To Village Board The Traffic Control And Residential
Traffic Calming Policy And Application.
New Business
Discuss The Recommendation To Village Board For Approval Of The Purchase And
Installation Of Four In-Vehicle Radios For The Public Works Fleet.
ADDITIONAL FLEET RADIOS MEMO.PDF
Consider The Recommendation To Village Board For Approval Of The Purchase And
Installation Of Four In-Vehicle Radios For The Public Works Fleet.
Discuss Future Planning For The Intersection Of Bonnie Road And Progress Drive.
PROGRESS AND BONNIE_ FUTURE PLANNING.PDF
Director's And Engineering Report
PW DIRECTORS REPORT. 11112026.PDF
Adjournment
This agenda has been prepared by Staff and approved by the Chair of the Public Works, Properties
& Sustainability Committee for use at the meeting as listed above. Any item on the agenda is
subject to final action. Notice: Persons needing special accommodation should call 608 -839-4704
at least 24 hours prior to the meeting. It is possible that members of and possibly a quorum of
members of other governmental bodies may attend the above stated meeting to gather information;
no action will be taken by any governmental body at the above-stated meeting other than the
governmental body specifically referred to above in this notice.
1.
2.
3.
4.
Documents:
5.
a.
Documents:
a.i.
6.
a.
Documents:
a.i.
b.
Documents:
7.
Documents:
8.
VILLAGE OF COTTAGE GROVE
NOTICE OF PUBLIC MEETING
Public Works, Properties & Sustainability Committee
Wednesday, November 11, 2026
5:30 p.m.
This meeting will take place as a hybrid meeting both virtually via Zoom and in person at Village
Hall at 221 E. Cottage Grove Road. If you are utilizing Zoom, please join the meeting from your
computer, tablet or smartphone by visiting https://us06web.zoom.us/j/81667308771?
pwd=NzL458EUYau7KdOkEcyt4z8fwsNoCp.1. You can also participate via phone by dialing 1 312
626 6799 and use Meeting ID 816 6730 8771# When asked for your Participant ID, just press #,
when asked for the Passcode enter 221.You may also choose to participate by providing public
comment prior to the meeting via email to Village Clerk Lisa Kalata: lkalata@village.cottage-
grove.wi.us. If this is a teleconference, virtual or hybrid meeting, please review the Village of
Cottage Grove’s policy.
Call Meeting To Order
Determination Of Quorum And That The Agenda Was Properly Posted
PUBLIC APPEARANCES-Public's Opportunity To Speak
Discuss And Consider The Minutes Of The Public Works, Properties & Sustainability
Committee Meeting Of October 14, 2026.
10-14-26 PW MINUTES.PDF
Unfinished Business
Discuss The Recommendation To Village Board The Traffic Control And Residential
Traffic Calming Policy And Application.
RESIDENTIAL TRAFFIC CALMING POLICY.NOVEMBER.PDF
RESIDENTIAL TRAFFIC CONCERN AND TRAFFIC CALMING REQUEST
APPLICATION.PDF
Consider The Recommendation To Village Board The Traffic Control And Residential
Traffic Calming Policy And Application.
New Business
Discuss The Recommendation To Village Board For Approval Of The Purchase And
Installation Of Four In-Vehicle Radios For The Public Works Fleet.
ADDITIONAL FLEET RADIOS MEMO.PDF
Consider The Recommendation To Village Board For Approval Of The Purchase And
Installation Of Four In-Vehicle Radios For The Public Works Fleet.
Discuss Future Planning For The Intersection Of Bonnie Road And Progress Drive.
PROGRESS AND BONNIE_ FUTURE PLANNING.PDF
Director's And Engineering Report
PW DIRECTORS REPORT. 11112026.PDF
Adjournment
This agenda has been prepared by Staff and approved by the Chair of the Public Works, Properties
& Sustainability Committee for use at the meeting as listed above. Any item on the agenda is
subject to final action. Notice: Persons needing special accommodation should call 608 -839-4704
at least 24 hours prior to the meeting. It is possible that members of and possibly a quorum of
members of other governmental bodies may attend the above stated meeting to gather information;
no action will be taken by any governmental body at the above-stated meeting other than the
governmental body specifically referred to above in this notice.
1.
2.
3.
4.
Documents:
5.
a.
Documents:
a.i.
6.
a.
Documents:
a.i.
b.
Documents:
7.
Documents:
8.
VILLAGE OF COTTAGE GROVE
Public Works, Properties & Sustainability Committee
Wednesday, October 14, 2026
MINUTES
1. Call to order
Stoa called the Public Works, Properties & Sustainability Committee meeting to order at 5:31 pm. This was a
hybrid meeting.
2. Determination of quorum and that the agenda was properly posted.
It was noted that a quorum was present, and that the agenda was properly posted. Committee members were
Chris Stoa, Paula Severson, Nick Hess, Cassie Mordini, Mike Hackel, Jim Elmore and Andy Eberhardt. Staff
members present were Public Works & Utilities Director Kyela O’Loughlin, and Clerk Lisa Kalata.
3. PUBLIC APPEARANCES -None
4. Discuss and consider the Minutes from the Public Works, Properties & Sustainability Committee Meeting
of September 16, 2026.
Motion by Hess to approve September 16, 2026, meeting minutes, seconded by Hackel. Motion carried with a
voice vote of 7-0-0.
5. Unfinished Business
a. Discuss the recommendation to Village Board for the Agreement For Services with GRAEF regarding
the Active Transportation Plan.
a.i. Consider the recommendation to Village Board for the Agreement For Services with GRAEF regarding
the Active Transportation Plan.
Motion by Hess to recommend approval of the agreement for services with GRAEF regarding the Active
Transportation Plan, seconded by Severson. Motion carried with a voice vote of 7-0-0.
6. New Business
a. Discuss Message Board Request.
a.i. Consider Message Board Request.
Motion by Hackel to approve the message board request, seconded by Eberhardt. Motion carried with a voice
vote of 7-0-0.
b. Discuss existing and potential future permanent digital sign.
Staff direction was to get costs on a digital sign for future discussion and budgets.
7. Director's and Engineering Report
O’Loughlin gave a brief overview of the Director’s and Engineering reports.
8. Adjournment
Motion by Hackel to adjourn at 5:48 p.m., seconded by Elmore. Motion carried with a voice vote of 7-0-0.
Lisa Kalata, Village Clerk
Village of Cottage Grove
Approved:
These minutes represent the general subject discussed in this meeting but do not reflect a verbatim documentation of the subjects and
conversations that took place.
1
Department of Public Works
DRAFT NOVEMBER 2026
2026
Traffic Control and Residential Traffic
Calming Policy
POLICY, GUIDELINES, AND PROCEDURE
PREPARED BY: KYELA O'LOUGHLIN, PE – PUBLIC WORKS AND UTILITIES DIRECTOR
2
Table of Contents
Introduction .................................................................................................................. 3
1. Purpose ................................................................................................................... 3
2. Glossary of Terms .................................................................................................... 4
3. Policy Principles ....................................................................................................... 6
3.1 Reliability and Long-Term Stewardship ................................................................ 6
3.2 Cost-Effective Use of Public Resources............................................................... 7
3.3 Customer-Focused Service ................................................................................. 7
3.4 Public Service and Community Well-Being .......................................................... 7
3.5 Data-Driven Evaluation ....................................................................................... 7
3.6 Balanced Mobility ................................................................................................ 7
3.7 Equity and Consistency ....................................................................................... 7
4. Applicability .............................................................................................................. 7
5. Stop Sign Installation and Evaluation ........................................................................ 8
6. Residential Traffic Calming Measures ....................................................................... 8
7. Minimum Requirements for Review .......................................................................... 9
8. Evaluation Methodology ......................................................................................... 10
9. Prioritization Framework ......................................................................................... 10
10. Request and Evaluation Process .......................................................................... 11
10.1 Request Submission ....................................................................................... 11
10.2 Initial Screening .............................................................................................. 11
10.3 Data Collection ............................................................................................... 11
10.4 Technical Evaluation ....................................................................................... 11
10.5 Recommendation Development ...................................................................... 11
10.6 Community Engagement ................................................................................. 11
11. Installation, Maintenance, and Monitoring ............................................................. 12
12. Periodic Review and Removal .............................................................................. 12
13. Documentation ..................................................................................................... 12
3
Introduction
The Village of Cottage Grove Public Works and Utilities Department is responsible for
maintaining safe, functional, and cost-effective residential streets. As the community
continues to grow, managing vehicles and improving safety for pedestrians, bicyclists,
and motorists has become increasingly important.
This policy establishes a clear, consistent, and data-driven process for evaluating
neighborhood traffic concerns. It outlines how residents may request traffic calming,
how the Village reviews and prioritizes locations, and how recommendations move
through committee and Village Board review. The policy supports transparency, fiscal
responsibility, and long-term stewardship of the Village transportation system.
1. Purpose
The Village of Cottage Grove is committed to providing a transportation system that
promotes the safe, efficient, and orderly movement of people throughout the community.
Public roadways serve many functions, including access to homes and businesses,
emergency response, school transportation, recreational travel, and pedestrian and
bicycle activity. As the Village continues to grow and develop, traffic patterns and
transportation needs evolve, creating new opportunities and challenges related to
roadway safety, neighborhood livability, and traffic operations.
The purpose of this policy is to establish a comprehensive, objective, and transparent
framework for evaluating traffic control concerns and residential traffic calming requests
on Village-owned roadways. The policy provides community members, Village staff, and
Village Trustees with a clearly defined process for identifying, evaluating, prioritizing,
and addressing traffic-related concerns using accepted engineering principles and
transportation planning practices.
This policy recognizes that concerns regarding speeding, pedestrian safety, bicycle
safety, intersection operations, and neighborhood quality of life are important community
issues. At the same time, traffic control measures and traffic calming improvements
must be evaluated carefully to ensure that they provide measurable safety benefits, are
consistent with accepted engineering practices, and do not create unintended impacts
elsewhere in the transportation system.
Transportation decisions made under this policy will be based upon objective
information, engineering judgment, roadway characteristics, crash history, operational
considerations, and community input. Through this balanced approach, the
Village seeks to improve public safety while maintaining roadway functionality,
emergency access, fiscal responsibility, and equitable treatment of all neighborhoods.
4
2. Glossary of Terms
2.1 85th-Percentile Speed
The speed at or below which 85% of motorists are traveling during a traffic speed study.
2.2 Arterial Street
A roadway designed to carry larger volumes of traffic between neighborhoods,
commercial areas, and regional destinations. Arterial streets emphasize mobility rather
than direct property access. Arterial streets include Cottage Grove Road and Main
Street.
2.3 Bicycle Activity
The presence, frequency, and patterns of bicycle travel within a corridor or at a specific
location.
2.4 Collector Street
A roadway that gathers and distributes traffic between local residential streets and
arterial roadways while also providing access to adjoining properties.
2.5 Cut-Through Traffic
Traffic utilizing a neighborhood street as an alternative route to avoid congestion,
delays, or traffic controls on higher classification roadways.
2.6 Data-Driven Evaluation
A review process that relies on objective information such as traffic counts, speed
studies, crash history, roadway conditions, and field observations.
2.7 Emergency Access
The ability of police, fire, emergency medical services, and public works personnel to
travel efficiently through the roadway network.
2.8 Engineering Judgment
The application of professional transportation engineering knowledge, experience, and
accepted practices in evaluating roadway conditions and traffic concerns.
2.9 Engineering Measure
A physical roadway improvement or design feature intended to influence traffic behavior,
improve safety, or manage traffic operations.
5
2.10 Engineering Study
A documented analysis of traffic conditions utilizing traffic data, field observations, crash
history, and accepted engineering principles.
2.11 Local Street
A roadway intended primarily to provide direct access to adjacent properties rather
than facilitate through traffic movement.
2.12 Near-Miss
An incident in which a collision was narrowly avoided but did not result in a reported
crash.
2.13 Pedestrian Activity
The presence, frequency, and movement characteristics of people walking within a
corridor or at a specific location.
2.14 Posted Speed Limit
The legally established speed limit displayed through regulatory signage.
2.15 Priority Ranking
The categorization of locations based on established evaluation criteria to assist in
determining implementation priority.
2.16 Public Works Department
The Village department responsible for administering this policy and maintaining
transportation infrastructure within Village jurisdiction.
2.17 Speed Awareness Sign
A temporary or permanent electronic sign that displays a driver's speed to encourage
voluntary compliance with posted speed limits.
2.18 Stop Sign
A regulatory traffic control device requiring motorists to come to a complete stop and
yield the right-of-way before proceeding.
2.19 Traffic Calming
The use of education, enforcement, engineering, and operational strategies intended to
reduce speeding, discourage cut-through traffic, and improve neighborhood safety.
6
2.20 Traffic Circle
A circular roadway improvement intended to reduce vehicle speeds and improve
intersection operations.
2.21 Traffic Control Device
Any sign, signal, pavement marking, or device placed on or adjacent to a roadway to
regulate, warn, or guide traffic.
2.22 Traffic Count
A measurement of vehicle, bicycle, and/or pedestrian activity over a specified period.
2.23 Traffic Volume
The total number of vehicles using a roadway during a specified period of time.
2.24 Village
The Village of Cottage Grove, Wisconsin.
2.25 Vulnerable Road User
A roadway user with greater exposure to injury in a traffic crash, including pedestrians,
bicyclists, wheelchair users, children, and older adults.
2.26 WMUTCD
The Wisconsin Manual on Uniform Traffic Control Devices.
3. Policy Principles
The Village recognizes that effective transportation management requires balancing
safety, accessibility, mobility, operational efficiency, and fiscal responsibility.
3.1 Reliability and Long-Term Stewardship
Transportation infrastructure represents a significant public investment. Traffic control
devices and traffic calming measures should be selected and implemented in a manner
that promotes long-term system reliability and sustainability. Consideration will be given
to maintenance requirements, lifecycle costs, future roadway improvements, and
compatibility with existing infrastructure.
7
3.2 Cost-Effective Use of Public Resources
The Village has a responsibility to utilize public funds efficiently. Traffic improvements
should provide measurable public benefits while balancing installation costs,
maintenance obligations, and long-term operational impacts.
3.3 Customer-Focused Service
Residents are often the first to identify evolving traffic concerns within their
neighborhoods. The Village is committed to maintaining a transparent and responsive
process for evaluating requests and communicating findings.
3.4 Public Service and Community Well-Being
Transportation decisions should promote safety, accessibility, and quality of life while
considering the needs of motorists, pedestrians, bicyclists, children, older adults, and
persons with disabilities.
3.5 Data-Driven Evaluation
Traffic concerns will be evaluated using objective information whenever practical.
Decisions should be based on measured conditions rather than perception alone.
3.6 Balanced Mobility
Traffic calming measures should improve safety without creating unreasonable impacts
to emergency services, school transportation, snow removal operations, public transit,
or neighboring roadways. Unreasonable impacts may include significant degradation of
service levels, excessive operational costs, substantial traffic diversion, impaired
emergency access, or other effects that outweigh the anticipated safety benefits.
3.7 Equity and Consistency
All traffic concerns should be evaluated using consistent procedures and objective
criteria to ensure fair and equitable treatment throughout the Village.
4. Applicability
This policy applies to Village-owned and maintained roadways and establishes the
criteria and procedures used to evaluate traffic control concerns and residential traffic
calming requests.
Traffic calming measures may be considered on local and collector streets where
speeding, pedestrian concerns, bicycle concerns, or other documented safety issues
are present. The policy generally applies to residential streets with posted speed limits
of 25 miles per hour or less.
8
Roadways classified as arterial streets, private roads, or streets maintained by another
governmental agency are generally not eligible under this policy unless specifically
authorized through a construction project, an intergovernmental agreement or other
formal arrangement.
Common concerns eligible for review include recurring speeding, pedestrian safety
issues, bicycle safety concerns, school-zone safety concerns, crash history, sight-
distance concerns, near-miss incidents, and requests for stop sign evaluation.
5. Stop Sign Installation and Evaluation
The Village recognizes that stop signs are among the most frequently requested traffic
control devices. However, stop signs are intended to assign right-of-way at intersections
and improve safety by reducing conflict points. Stop signs are not intended to function
as traffic calming devices or speed control measures.
The installation, modification, or removal of stop signs should be guided by engineering
judgment and accepted traffic engineering practices. Evaluations will consider roadway
classification, traffic volumes, vehicle speeds, intersection geometry, sight distance,
crash history, pedestrian activity, bicycle activity, nearby schools and parks, and overall
safety conditions.
Minor-road stop control may be appropriate where a lower-volume roadway intersects a
higher-volume roadway and right-of-way assignment is necessary. Stop control may
also be appropriate where visibility restrictions, crash patterns, or other documented
safety concerns support additional traffic control.
Multi-way stop control, also called an all-way stop, may be considered where traffic
volumes, crash history, pedestrian activity, or restricted sight distance support
installation. Any recommendation for all-way stop control should be supported by
engineering review and accepted traffic control guidance.
Requests for stop signs based solely on perceived speeding, isolated incidents, or
neighborhood preference may not warrant installation where engineering judgement
and accepted traffic engineering practices does not support additional stop control.
6. Residential Traffic Calming Measures
Traffic calming consists of educational, enforcement, operational, and physical roadway
measures intended to improve safety and reduce undesirable traffic behaviors. The
Village recognizes that no single traffic calming measure is appropriate
in every situation and that successful programs often involve multiple complementary
strategies.
9
Educational measures may include neighborhood outreach efforts, public safety
campaigns, and speed awareness programs intended to improve voluntary compliance
with traffic laws.
Enforcement measures may be utilized in coordination with law enforcement and can
include directed patrols, portable speed feedback trailers, targeted enforcement
operations, and other activities intended to address documented traffic violations.
Engineering measures may be considered when data demonstrates a continuing traffic
concern. Examples may include speed humps, speed tables, curb extensions, traffic
circles, median islands, roadway narrowing treatments, pavement marking
modifications, mini-roundabouts, and pedestrian refuge treatments.
Temporary or pilot projects may be installed when appropriate to evaluate effectiveness
before a permanent improvement is considered. Temporary or pilot projects will be
evaluated by the Public Works and Utilities Director, or their designee, discussed during
Public Works, Properties, and Sustainability Committee meetings, and referred to the
Village Board for consideration to implement up to a certain fiscal amount.
7. Minimum Requirements for Review
To ensure that Village resources are focused on locations demonstrating documented
need and community interest, requests for traffic calming must satisfy minimum
submission requirements.
A request should include the following:
1. Completed application
2. Description of the traffic concern. Clearly describe how the concern affects
safety, mobility, accessibility, or neighborhood quality of life.
3. Identification of the affected roadway
4. Contact information for a neighborhood representative.
5. Optional: Signatures from adjacent households located within the affected area
indicating support for the traffic concern can be provided and are encouraged.
Submission of a request does not guarantee implementation of traffic calming
measures or traffic control modifications. All requests remain subject to engineering
evaluation, prioritization, available funding, and staff resources.
The Village may also initiate traffic evaluations independently based upon crash history,
police observations, roadway conditions, or other identified safety concerns.
10
8. Evaluation Methodology
Traffic concerns will be evaluated through a structured and objective process intended
to ensure consistency and transparency in decision-making.
The Village may collect information related to vehicle speeds, traffic volumes, crash
history, roadway geometry, parking conditions, pedestrian activity, bicycle activity, land
uses, and visibility limitations. Field observations may also be conducted to better
understand traffic operations and roadway user behavior.
The evaluation process will consider both quantitative and qualitative information.
Engineering judgment may be used to interpret collected data and identify feasible
solutions that address observed conditions.
Recommendations will balance potential safety benefits with cost, operational impacts,
maintenance obligations, emergency response considerations, and community
input. Where practical, the Village will seek to identify solutions that address the
underlying cause of a traffic concern rather than merely responding to observed
symptoms.
9. Prioritization Framework
The Village recognizes that available staff time and funding are limited. Accordingly,
requests will be prioritized to ensure that locations exhibiting the greatest demonstrated
need receive appropriate consideration.
Priority rankings should consider the severity of speeding, traffic volumes, crash history,
pedestrian activity, bicycle activity, school proximity, infrastructure condition, and
implementation feasibility.
High-priority locations typically include those exhibiting significant speeding concerns,
documented crash patterns, substantial pedestrian activity, vulnerable roadway users,
or safety concerns affecting schools and parks.
Medium-priority locations generally demonstrate measurable concerns that warrant
future attention but do not present the same level of urgency.
Low-priority locations typically include those where available data indicates limited
safety concerns or where conditions do not support immediate intervention.
Priority rankings may be adjusted periodically as new information becomes available or
projects are completed.
11
10. Request and Evaluation Process
The Village will utilize a standardized process for evaluating traffic concerns.
10.1 Request Submission
Residents may submit a traffic concern request using Village-provided application to the
Public Works and Utilities Director.
10.2 Initial Screening
The Public Works and Utilities Director, in conjunction with the Village’s Engineering
Consultant and Chief of Police, are responsible for reviewing submissions to confirm
eligibility, roadway jurisdiction, and completeness. Submissions will be reported to the
Public Works, Properties, and Sustainability Committee at the meeting following a
submission.
10.3 Data Collection
Village Staff may conduct speed studies, traffic counts, crash history reviews, field
observations, and other assessments necessary to evaluate existing conditions, as time
and resources allow. Typical data collection timeline is approximately 60 days.
10.4 Technical Evaluation
Collected information will be analyzed to determine whether a documented traffic
concern exists and whether corrective measures may be warranted.
10.5 Recommendation Development
The Public Works and Utilities Director may prepare a recommendation identifying
existing conditions, proposed improvements, potential benefits, operational impacts,
maintenance considerations, and estimated costs. The proposed recommendation
would then be discussed at a Public Works, Properties, and Sustainability Committee
meeting and also potentially at a Law Enforcement Committee (LEC) meeting for review
and recommendation to Village Board.
The applicant will be made aware in advance of the date, time, and location of the
meeting(s) when the request will be discussed. Meetings are held both in person and a
virtual hybrid option.
10.6 Community Engagement
Where appropriate, residents may be provided with an opportunity to offer feedback
through surveys, meetings, notices, or other public engagement activities.
12
11. Installation, Maintenance, and Monitoring
Traffic control devices and traffic calming measures may be installed in accordance
with applicable engineering standards, manufacturer recommendations, and Village
design practices once approved through the proper approval channels.
Following installation, the Village may monitor locations to determine whether
improvements are functioning as intended. Monitoring may include traffic counts, speed
studies, crash reviews, field observations, or resident feedback.
The Village is responsible for maintaining installed improvements in a condition that
supports their intended function and may modify improvements if unforeseen
operational or safety concerns arise.
12. Periodic Review and Removal
Traffic conditions evolve as development occurs, travel patterns change, and roadway
networks mature. Therefore, installed traffic control devices and traffic calming
measures may be reviewed periodically to determine whether they remain
appropriate and effective.
The Village may modify, replace, upgrade, or remove existing improvements when
engineering analysis indicates that conditions have changed, treatment is no longer
effective, maintenance costs have become excessive, or alternative solutions would
better address identified concerns.
Any significant modification should consider updated traffic data, engineering judgment,
operational impacts, and community considerations.
13. Documentation
The Village will maintain records associated with traffic control and residential traffic
calming activities to support transparency, consistency, and informed decision-making.
Documentation may include requests submitted by residents, traffic counts, speed
studies, crash analyses, engineering evaluations, field observations, public engagement
materials, recommendations, installation records, maintenance activities, and post-
implementation monitoring data.
These records will support future evaluations, assist in project prioritization, preserve
institutional knowledge, and facilitate the effective long-term management of the Village
transportation system.
Residential Traffic Concern & Traffic Calming Request
Application
Section 1: Request Information
Applicant Name________________________________________________
Applicant’s Street Address _______________________________________
Applicant’s Phone Number________________________________________
Applicant’s Email Address ________________________________________
Date of Submission _____________________________________________
Section 2: Location of Concern
Street Name(s) or Area to be Evaluated: _______________________________________
Limits of Concerned Area: __________________________________________________
Roadway within Village jurisdiction? ☐ Yes ☐ No ☐ Unsure
Section 3: Type of Traffic Concern
☐ Vehicle speeding ☐ Cut-through traffic ☐ Pedestrian safety concern ☐ Bicycle safety concern
☐ School-related safety concern ☐ Park-related safety concern ☐ Stop sign evaluation
☐ Crash history ☐ Near-miss incidents ☐ Accessibility concern ☐ Other: __________
Section 4: Describe the Concern
Description:
________________________________________________________________________
________________________________________________________________________
Section 5: Observed Conditions
When does the problem occur? __________________________________
How long has the issue existed? _______________________________
Section 6: Safety Information
Observed crashes? ☐ Yes ☐ No
Near misses? ☐ Yes ☐ No
Additional details: __________________________________________
Section 7: Supporting Documentation
☐ Photos ☐ Videos ☐ Maps ☐ Written Statements ☐ Other
Section 8: Applicant Acknowledgment
Signature: ____________________ Date: ____________________
Section 9: Opportunity to show Neighborhood Support
# Name Address Signature
1
2
3
4
5
6
7
General Instructions:
• Submit the completed application and supporting documentation to the Public Works & Utilities
Director, Kyela O’Loughlin, PE, at koloughlin@villageofcottagegrove.gov
The Village of Cottage Grove, WI
Staff Report
Memo Date: November 11, 2026
To: Public Works, Properties, and Sustainability Committee
From: Kyela O’Loughlin, P.E., Public Works and Utilities Director
Jason Anderson, Street Superintendent
Subject: Additional Fleet Radios
Overview
The Village’s two oldest plow trucks, the street sweeper, and the Director’s vehicle currently do not have in-vehicle
radios and rely on handheld units for communication.
Although the two oldest plow trucks are identified in the Fleet Replacement Schedule, equipping the entire snow and
maintenance fleet with in-vehicle radios will improve operational efficiency, communication reliability, and employee
safety. In addition, the radios can be removed and reinstalled in future replacement vehicles, allowing the Village to
retain the investment over time.
This investment will improve communication capabilities across the fleet while enhancing operational efficiency and
employee safety during snow operations and other Public Works activities, including an emergency situations.
Recommendation
Public Works, Properties, and Sustainability Committee recommend approval to the Village Board of a $20,000 for the
purchase and installation of four in-vehicle radios for the Public Works fleet. Funding for this purchase will be provided
through savings realized from 2026 fleet purchases.
Trustee Memo
Meeting Date: 11/11/2026 Memo Date: 11/2/2026 To: Public Works, Properties, and Sustainability Committee From: Committee Chair Chris Stoa Subject: Future Planning: Intersection of Progress Dr and Bonnie Rd
Background/Overview
In
2025,
the
majority
of
Bonnie
Rd
was
repaved.
At
the
time,
the
Public
Works
Committee
held
off
on
making
a
decision
on
what
to
do
with
the
intersection
of
Progress
Dr
and
Bonnie
because
we
wanted
to
see
what
the
intersection
might
look
like
after
the
police
station
project
was
designed/completed.
Additionally, through the Capital Prioritization Process, the Village Board moved up repaving
Progress
Dr
to
2028.
It
seems
prudent
to
begin
to
plan
for
what
that
intersection
might
look
like
before
we
plan
for
the
reconstruction
of
Progress
Dr.
Below is an image of the intersection (with the police station project overlaid).
Information
I
believe
that
the
intersection
needs
to
be
shrunk.
While
recognizing
that
some
trucks
do
need
to
navigate
it,
it
is
a
treacherous
intersection
for
pedestrians,
and
the
wide
turn
radius
causes
cars
to
drive
fast
when
turning.
It
has
been
nice
seeing
people
driving
a
little
slower
in
the
area
with
the
(temporary)
addition
of
construction
vehicles
that
are
parked
on
the
sides
of
Bonnie.
Still,
I
believe
we
should
shrink
it.
Trustee Memo
We should start with a pilot paint project to see how it could work. Below is an image showing
how
simple
a
pilot
could
be,
allowing
us
to
test
out
a
smaller
turn
radius:
This pilot project will allow us to identify what we’d like the radius to be while still allowing larger
trucks
to
turn.
By
observing
trucks
turning
(as
well
as
paint
wear),
we
can
better
understand
how
tight
we
can
make
the
turn
radius
while
still
allowing
trucks
to
navigate
the
roads.
For the long term, I would like to make the smaller radius permanent. This will lower crossing
distances
for
pedestrians,
and
slow
vehicle
traffic
instead
of
allowing
cars
to
take
this
turn
at
fairly
high
speeds.
Additionally, lowering the curb radius will reclaim some space on the northeast corner. This
would
be
a
perfect
opportunity
to
build
something
like
a
veterans
memorial,
honoring
those
from
Cottage
Grove
who
served
in
our
Armed
Forces.
What
the
ultimate
layout,
look,
cost,
and
funding
source
of
a
memorial
would
look
like
would
ultimately
be
up
to
the
Village
Board,
but
we
can
prepare
the
land
for
hosting
something
like
this
when
Progress
is
repaved.
Below
is
a
very
rough
layout
of
what
a
revamped
intersection
could
look
like:
Trustee Memo
Trustee Request/Recommendation
Discuss the future of the Bonnie Road/Progress Drive intersection.
Director Report
MG School Start – Weald Bridge/Taylor/Main Street Intersection
Since school began, the Police Department and I have been monitoring traffic flows along Main
Street and at the Main Street/Weald Bridge/Taylor intersection. Traffic has significantly
improved with communications that have been coordinated between the MG School District and
the Village. Parents are encouraged to queue in the “parking lane” along Main Street. This allows
for traffic to flow along Main Street. Additionally, traffic patterns have continued to change as
we are only seeing a handful of cars queuing on Weald Bridge. The detour route for the CTH BB
bridge closure has created additional backups at times on Taylor Street. Once this project has
been completed the intersection will continue to be monitored closely.
2027 Traffic Study
Following the approval of the budget on November 16
th, I will be signing the 2027 Traffic Study
Agreement with GRAEF.
Salt Wise Training
Public Works staff attended the Salt Wise Training at the end of October. This event was
partnered by Dane County Highway Department and provided staff with an opportunity to learn
additional best practices in snow and ice control and see a variety of winter maintenance
equipment.
Engineering Report
Quarry Ridge – Phase D
The contractor is working through the punch list for the last phase of construction. Village staff
have contacted Developer to complete the eastern extension of School Road to meet the
requirements of the Developer’s Agreement for Phase C.
Amazon Facility
The contractor has completed the public utility construction at the Amazon Facility on-site. Off-
site improvements on CTH TT and CTH N have been substantially completed and all lanes on
CTH TT and CTH N are open to traffic. Additional information can be found on the Village’s
website. The contractor is working through remaining punch list items.
Public Works, Properties, &
Sustainability Committee
Director and Engineering Monthly Report –
November 11, 2026
HeyDay Cottage Grove
The multi-use path was constructed along the HeyDay property in June and construction of the
off-site improvements, including turn lanes on Buss Road have been completed. The traffic light
improvements at Buss Road and Cottage Grove Road were completed in September. A final
walk through and punch list was completed mid-October within the development, and the
contractor is working on the punch list items.
Juniper Fields Development
The developer is working to finalize the remaining items needed prior to mass grading efforts for
the first phase of the project, which is anticipated to begin in early November, followed by utility
installation.
2026 Street and Pedestrian Improvements Project
The project is substantially completed, and all punch list items have been addressed. The final
pay application with the remaining retainage is anticipated in the upcoming weeks.
Stormwater Utility Feasibility Study
The 2027 Stormwater Utility Budget will be discussed at the 5pm Utility Commission Meeting
on November 11
th.
2027 Construction Projects – S. Main Street and Ollie Street Reconstruction
Strand has started preliminary design for both the reconstruction projects for next year. A Public
Information Meeting will be held for both projects on November 5
th.
Sustainability Report
Below are totals for the MSB Solar and Bakken Park Shelter Solar month by month for 2024
through September 2026. In total, at MSB, the total Alliant invoices have equated to $39,670 and
solar production has saved the Village $4,955, approximately 12% over the last 3 years. At
Bakken Park, the total Alliant invoices have equated to $1887 and solar production has saved the
Village $138, approximately 7%.
Alliant - 200 Progress Drive Solar
Dates Parallel Generation Bill Amount
Production
(MWh)
1/11/2024-2/12/2024 -21.92 1371.98 0.93
2/12/24-3/11/24 -203.30 934.70 8.07
3/11/2024-4/10/2024 -183.39 979.84 9.91
4/10/2024-5/9/2024 -199.76 793.10 9.53
5/9/2024-6/13/2024 -315.08 998.15 12.5
6/13/2024-7/11/2024 -220.72 1038.11 12.9
7/11/2024-8/13/2024 -259.47 1133.87 13.8
8/13/2024-9/12/2024 -194.00 1171.92 12.2
9/12/2024-10/10/2024 -118.80 944.30 10.7
10/10/2024-11/8/2024 -73.39 870.72 8.04
11/8/2024-12/10/2024 -26.66 1175.02 3.94
12/10/2024-1/13/2025 -4.07 1424.57 2.74
Total: $ (1,820.56) $ 12,836.28 105.26
Alliant - 200 Progress Drive Solar
Dates Parallel Generation Bill Amount
Production
(MWh)
1/13/2025-2/11/2025 -51.86 1601.02 5.46
2/11/2025-3/11/2025 -59.41 1580.42 4.89
3/11/2025-4/10/2025 -69.22 1262.64 7.33
4/10/2025-5/12/2025 0.37 1429.72 4.58
5/12/2025-6/10/2025 1221.86 4.23
6/10/2025-7/11/2025 9.68 1779.44 4.22
7/11/2025-8/11/2025 -138.87 1421.87 6.54
8/11/2025-9/10/2025 -233.35 1029.54 13.1
9/10/2025-10/09/2025 -136.87 1036.88 11.2
10/9/2025-11/10/2025 -91.18 1131.58 7.9
11/10/2025-12/10/2025 -22.19 1577.41 4.4
12/10/2025-1/12/2026 -5.26 1879.98 1.39
Total: $ (798.16) $ 16,952.36 75.24
*2025 had invoicing amounts updated in May on Alliant’s billing side.
Alliant - 200 Progress Drive Solar
Dates Parallel Generation Bill Amount Production (MWh)
1/12/2026-2/10/2026 -30.23 1513.34 2.92
2/10/2026-3/10/2026 -105.51 1139.29 6.65
3/10/2026-4/10/2026 -35.41 1218.97 6.06
4/10/2026-5/12/2026 -275.74 909.2 9.33
5/12/2026-6/10/2026 -360.21 820.69 14.8
6/10/2026-7/10/2026 -580.63 993.05 13.8
7/10/2026-8/12/2026 -484.85 1162.77 14.9
8/12/2026-9/11/2026 -339.35 1127.59 12
9/11/2026-10/12/2026 -125.78 1001.73 8.22
October
November
December
Total: $ (2,337.71) $ 9,886.63 88.68
Alliant - Bakken Park Solar
Dates Parallel Generation Bill Amount
Production
(MWh)
1/11/2024-2/12/2024 0.00 48.77 0
2/12/2024-3/12/2024 -9.04 7.79 0.34
3/12/2024-4/11/2024 -9.66 7.72 0.76
4/11/2024-5/10/2024 -5.10 12.06 0.97
5/10/2024-6/12/2024 -13.85 4.98 1.21
6/12/2024-7/11/2024 0.00 323.39 1.21
7/11/2024-8/12/2024 -0.91 18.41 1.29
8/12/2024-9/12/2024 0.00 41.73 1.13
9/12/2024-10/11/2024 0.00 104.87 0.99
10/11/2024-11/11/2024 0.00 112.56 0.77
11/11/2024-12/11/2024 0.00 71.15 0.3
12/11/2024-1/13/2025 0.00 53.32 0.21
Total: $ (38.56) $ 806.75 9.18
Alliant - Bakken Park Solar
Dates Parallel Generation Bill Amount
Production
(MWh)
1/13/2025-2/12/2025 -2.74 15.22 0.42
2/12/2025-3/12/2025 -2.65 14.11 0.3
3/12/2025-4/11/2025 -0.31 0.85
4/11/2025-5/12/2025 -13.52 3.82 0.98
5/12/2025-6/11/2025 -9.80 9.8 1.21
6/11/2025-7/14/2025 0.00 53.47 1.26
7/14/2025-8/12/2025 -5.74 10.78 1.25
8/12/2025-9/11/2025 0.00 48.88 1.13
9/11/2025-10/10/2025 0.00 102.49 0.95
10/10/2025-11/11/2025 0.00 158.46 0.65
11/11/2025-12/11/2025 0.00 107.64 0.35
12/11/2025-1/13/2026 0.00 58.24 0.11
Total $ (34.45) $ 582.60 9.46
Alliant - Bakken Park Solar
Dates: Parallel Generation Bill Amount Production (MWh)
1/13/2026-2/11/2026 0.00 34.38 0.28
2/11/2026-3/11/2026 -9.83 12.39 0.52
3/11/2026-4/10/2026 -10.55 13.26 0.79
4/10/2026-5/12/2026 -14.85 10.44 1
6/10/2026-7/10/2026 -18.08 15.83 1.35
5/12/2026-6/10/2026 -7.27 5.5 1.22
7/10/2026-8/12/2026 -5.91 20.46 1.33
8/12/2026-9/11/2026 0.00 200.49 0.36
9/11/2026-10/12/2026 0.00 185.71 0.25
October
November
December
Total: $ (66.49) $ 498.46 $ 7.10
Source: Village of Cottage Grove website. First collected Nov 8, 2026.