RecordWell Data

Packet

Village of Cottage Grove · Dane County · meeting of Nov 11, 2026 · Agenda packets

Open the original document More from Village of Cottage Grove

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

VILLAGE OF COTTAGE GROVE NOTICE OF PUBLIC MEETING Public Works, Properties & Sustainability Committee Wednesday, November 11, 2026 5:30 p.m. This meeting will take place as a hybrid meeting both virtually via Zoom and in person at Village Hall at 221 E. Cottage Grove Road. If you are utilizing Zoom, please join the meeting from your computer, tablet or smartphone by visiting https://us06web.zoom.us/j/81667308771? pwd=NzL458EUYau7KdOkEcyt4z8fwsNoCp.1. You can also participate via phone by dialing 1 312 626 6799 and use Meeting ID 816 6730 8771# When asked for your Participant ID, just press #, when asked for the Passcode enter 221.You may also choose to participate by providing public comment prior to the meeting via email to Village Clerk Lisa Kalata: lkalata@village.cottage- grove.wi.us. If this is a teleconference, virtual or hybrid meeting, please review the Village of Cottage Grove’s policy. Call Meeting To Order Determination Of Quorum And That The Agenda Was Properly Posted PUBLIC APPEARANCES-Public's Opportunity To Speak Discuss And Consider The Minutes Of The Public Works, Properties & Sustainability Committee Meeting Of October 14, 2026. 10-14-26 PW MINUTES.PDF Unfinished Business Discuss The Recommendation To Village Board The Traffic Control And Residential Traffic Calming Policy And Application. RESIDENTIAL TRAFFIC CALMING POLICY.NOVEMBER.PDF RESIDENTIAL TRAFFIC CONCERN AND TRAFFIC CALMING REQUEST APPLICATION.PDF Consider The Recommendation To Village Board The Traffic Control And Residential Traffic Calming Policy And Application. New Business Discuss The Recommendation To Village Board For Approval Of The Purchase And Installation Of Four In-Vehicle Radios For The Public Works Fleet. ADDITIONAL FLEET RADIOS MEMO.PDF Consider The Recommendation To Village Board For Approval Of The Purchase And Installation Of Four In-Vehicle Radios For The Public Works Fleet. Discuss Future Planning For The Intersection Of Bonnie Road And Progress Drive. PROGRESS AND BONNIE_ FUTURE PLANNING.PDF Director's And Engineering Report PW DIRECTORS REPORT. 11112026.PDF Adjournment This agenda has been prepared by Staff and approved by the Chair of the Public Works, Properties & Sustainability Committee for use at the meeting as listed above. Any item on the agenda is subject to final action. Notice: Persons needing special accommodation should call 608 -839-4704 at least 24 hours prior to the meeting. It is possible that members of and possibly a quorum of members of other governmental bodies may attend the above stated meeting to gather information; no action will be taken by any governmental body at the above-stated meeting other than the governmental body specifically referred to above in this notice. 1. 2. 3. 4. Documents: 5. a. Documents: a.i. 6. a. Documents: a.i. b. Documents: 7. Documents: 8. VILLAGE OF COTTAGE GROVE NOTICE OF PUBLIC MEETING Public Works, Properties & Sustainability Committee Wednesday, November 11, 2026 5:30 p.m. This meeting will take place as a hybrid meeting both virtually via Zoom and in person at Village Hall at 221 E. Cottage Grove Road. If you are utilizing Zoom, please join the meeting from your computer, tablet or smartphone by visiting https://us06web.zoom.us/j/81667308771? pwd=NzL458EUYau7KdOkEcyt4z8fwsNoCp.1. You can also participate via phone by dialing 1 312 626 6799 and use Meeting ID 816 6730 8771# When asked for your Participant ID, just press #, when asked for the Passcode enter 221.You may also choose to participate by providing public comment prior to the meeting via email to Village Clerk Lisa Kalata: lkalata@village.cottage- grove.wi.us. If this is a teleconference, virtual or hybrid meeting, please review the Village of Cottage Grove’s policy. Call Meeting To Order Determination Of Quorum And That The Agenda Was Properly Posted PUBLIC APPEARANCES-Public's Opportunity To Speak Discuss And Consider The Minutes Of The Public Works, Properties & Sustainability Committee Meeting Of October 14, 2026. 10-14-26 PW MINUTES.PDF Unfinished Business Discuss The Recommendation To Village Board The Traffic Control And Residential Traffic Calming Policy And Application. RESIDENTIAL TRAFFIC CALMING POLICY.NOVEMBER.PDF RESIDENTIAL TRAFFIC CONCERN AND TRAFFIC CALMING REQUEST APPLICATION.PDF Consider The Recommendation To Village Board The Traffic Control And Residential Traffic Calming Policy And Application. New Business Discuss The Recommendation To Village Board For Approval Of The Purchase And Installation Of Four In-Vehicle Radios For The Public Works Fleet. ADDITIONAL FLEET RADIOS MEMO.PDF Consider The Recommendation To Village Board For Approval Of The Purchase And Installation Of Four In-Vehicle Radios For The Public Works Fleet. Discuss Future Planning For The Intersection Of Bonnie Road And Progress Drive. PROGRESS AND BONNIE_ FUTURE PLANNING.PDF Director's And Engineering Report PW DIRECTORS REPORT. 11112026.PDF Adjournment This agenda has been prepared by Staff and approved by the Chair of the Public Works, Properties & Sustainability Committee for use at the meeting as listed above. Any item on the agenda is subject to final action. Notice: Persons needing special accommodation should call 608 -839-4704 at least 24 hours prior to the meeting. It is possible that members of and possibly a quorum of members of other governmental bodies may attend the above stated meeting to gather information; no action will be taken by any governmental body at the above-stated meeting other than the governmental body specifically referred to above in this notice. 1. 2. 3. 4. Documents: 5. a. Documents: a.i. 6. a. Documents: a.i. b. Documents: 7. Documents: 8. VILLAGE OF COTTAGE GROVE Public Works, Properties & Sustainability Committee Wednesday, October 14, 2026 MINUTES 1. Call to order Stoa called the Public Works, Properties & Sustainability Committee meeting to order at 5:31 pm. This was a hybrid meeting. 2. Determination of quorum and that the agenda was properly posted. It was noted that a quorum was present, and that the agenda was properly posted. Committee members were Chris Stoa, Paula Severson, Nick Hess, Cassie Mordini, Mike Hackel, Jim Elmore and Andy Eberhardt. Staff members present were Public Works & Utilities Director Kyela O’Loughlin, and Clerk Lisa Kalata. 3. PUBLIC APPEARANCES -None 4. Discuss and consider the Minutes from the Public Works, Properties & Sustainability Committee Meeting of September 16, 2026. Motion by Hess to approve September 16, 2026, meeting minutes, seconded by Hackel. Motion carried with a voice vote of 7-0-0. 5. Unfinished Business a. Discuss the recommendation to Village Board for the Agreement For Services with GRAEF regarding the Active Transportation Plan. a.i. Consider the recommendation to Village Board for the Agreement For Services with GRAEF regarding the Active Transportation Plan. Motion by Hess to recommend approval of the agreement for services with GRAEF regarding the Active Transportation Plan, seconded by Severson. Motion carried with a voice vote of 7-0-0. 6. New Business a. Discuss Message Board Request. a.i. Consider Message Board Request. Motion by Hackel to approve the message board request, seconded by Eberhardt. Motion carried with a voice vote of 7-0-0. b. Discuss existing and potential future permanent digital sign. Staff direction was to get costs on a digital sign for future discussion and budgets. 7. Director's and Engineering Report O’Loughlin gave a brief overview of the Director’s and Engineering reports. 8. Adjournment Motion by Hackel to adjourn at 5:48 p.m., seconded by Elmore. Motion carried with a voice vote of 7-0-0. Lisa Kalata, Village Clerk Village of Cottage Grove Approved: These minutes represent the general subject discussed in this meeting but do not reflect a verbatim documentation of the subjects and conversations that took place. 1 Department of Public Works DRAFT NOVEMBER 2026 2026 Traffic Control and Residential Traffic Calming Policy POLICY, GUIDELINES, AND PROCEDURE PREPARED BY: KYELA O'LOUGHLIN, PE – PUBLIC WORKS AND UTILITIES DIRECTOR 2 Table of Contents Introduction .................................................................................................................. 3 1. Purpose ................................................................................................................... 3 2. Glossary of Terms .................................................................................................... 4 3. Policy Principles ....................................................................................................... 6 3.1 Reliability and Long-Term Stewardship ................................................................ 6 3.2 Cost-Effective Use of Public Resources............................................................... 7 3.3 Customer-Focused Service ................................................................................. 7 3.4 Public Service and Community Well-Being .......................................................... 7 3.5 Data-Driven Evaluation ....................................................................................... 7 3.6 Balanced Mobility ................................................................................................ 7 3.7 Equity and Consistency ....................................................................................... 7 4. Applicability .............................................................................................................. 7 5. Stop Sign Installation and Evaluation ........................................................................ 8 6. Residential Traffic Calming Measures ....................................................................... 8 7. Minimum Requirements for Review .......................................................................... 9 8. Evaluation Methodology ......................................................................................... 10 9. Prioritization Framework ......................................................................................... 10 10. Request and Evaluation Process .......................................................................... 11 10.1 Request Submission ....................................................................................... 11 10.2 Initial Screening .............................................................................................. 11 10.3 Data Collection ............................................................................................... 11 10.4 Technical Evaluation ....................................................................................... 11 10.5 Recommendation Development ...................................................................... 11 10.6 Community Engagement ................................................................................. 11 11. Installation, Maintenance, and Monitoring ............................................................. 12 12. Periodic Review and Removal .............................................................................. 12 13. Documentation ..................................................................................................... 12 3 Introduction The Village of Cottage Grove Public Works and Utilities Department is responsible for maintaining safe, functional, and cost-effective residential streets. As the community continues to grow, managing vehicles and improving safety for pedestrians, bicyclists, and motorists has become increasingly important. This policy establishes a clear, consistent, and data-driven process for evaluating neighborhood traffic concerns. It outlines how residents may request traffic calming, how the Village reviews and prioritizes locations, and how recommendations move through committee and Village Board review. The policy supports transparency, fiscal responsibility, and long-term stewardship of the Village transportation system. 1. Purpose The Village of Cottage Grove is committed to providing a transportation system that promotes the safe, efficient, and orderly movement of people throughout the community. Public roadways serve many functions, including access to homes and businesses, emergency response, school transportation, recreational travel, and pedestrian and bicycle activity. As the Village continues to grow and develop, traffic patterns and transportation needs evolve, creating new opportunities and challenges related to roadway safety, neighborhood livability, and traffic operations. The purpose of this policy is to establish a comprehensive, objective, and transparent framework for evaluating traffic control concerns and residential traffic calming requests on Village-owned roadways. The policy provides community members, Village staff, and Village Trustees with a clearly defined process for identifying, evaluating, prioritizing, and addressing traffic-related concerns using accepted engineering principles and transportation planning practices. This policy recognizes that concerns regarding speeding, pedestrian safety, bicycle safety, intersection operations, and neighborhood quality of life are important community issues. At the same time, traffic control measures and traffic calming improvements must be evaluated carefully to ensure that they provide measurable safety benefits, are consistent with accepted engineering practices, and do not create unintended impacts elsewhere in the transportation system. Transportation decisions made under this policy will be based upon objective information, engineering judgment, roadway characteristics, crash history, operational considerations, and community input. Through this balanced approach, the Village seeks to improve public safety while maintaining roadway functionality, emergency access, fiscal responsibility, and equitable treatment of all neighborhoods. 4 2. Glossary of Terms 2.1 85th-Percentile Speed The speed at or below which 85% of motorists are traveling during a traffic speed study. 2.2 Arterial Street A roadway designed to carry larger volumes of traffic between neighborhoods, commercial areas, and regional destinations. Arterial streets emphasize mobility rather than direct property access. Arterial streets include Cottage Grove Road and Main Street. 2.3 Bicycle Activity The presence, frequency, and patterns of bicycle travel within a corridor or at a specific location. 2.4 Collector Street A roadway that gathers and distributes traffic between local residential streets and arterial roadways while also providing access to adjoining properties. 2.5 Cut-Through Traffic Traffic utilizing a neighborhood street as an alternative route to avoid congestion, delays, or traffic controls on higher classification roadways. 2.6 Data-Driven Evaluation A review process that relies on objective information such as traffic counts, speed studies, crash history, roadway conditions, and field observations. 2.7 Emergency Access The ability of police, fire, emergency medical services, and public works personnel to travel efficiently through the roadway network. 2.8 Engineering Judgment The application of professional transportation engineering knowledge, experience, and accepted practices in evaluating roadway conditions and traffic concerns. 2.9 Engineering Measure A physical roadway improvement or design feature intended to influence traffic behavior, improve safety, or manage traffic operations. 5 2.10 Engineering Study A documented analysis of traffic conditions utilizing traffic data, field observations, crash history, and accepted engineering principles. 2.11 Local Street A roadway intended primarily to provide direct access to adjacent properties rather than facilitate through traffic movement. 2.12 Near-Miss An incident in which a collision was narrowly avoided but did not result in a reported crash. 2.13 Pedestrian Activity The presence, frequency, and movement characteristics of people walking within a corridor or at a specific location. 2.14 Posted Speed Limit The legally established speed limit displayed through regulatory signage. 2.15 Priority Ranking The categorization of locations based on established evaluation criteria to assist in determining implementation priority. 2.16 Public Works Department The Village department responsible for administering this policy and maintaining transportation infrastructure within Village jurisdiction. 2.17 Speed Awareness Sign A temporary or permanent electronic sign that displays a driver's speed to encourage voluntary compliance with posted speed limits. 2.18 Stop Sign A regulatory traffic control device requiring motorists to come to a complete stop and yield the right-of-way before proceeding. 2.19 Traffic Calming The use of education, enforcement, engineering, and operational strategies intended to reduce speeding, discourage cut-through traffic, and improve neighborhood safety. 6 2.20 Traffic Circle A circular roadway improvement intended to reduce vehicle speeds and improve intersection operations. 2.21 Traffic Control Device Any sign, signal, pavement marking, or device placed on or adjacent to a roadway to regulate, warn, or guide traffic. 2.22 Traffic Count A measurement of vehicle, bicycle, and/or pedestrian activity over a specified period. 2.23 Traffic Volume The total number of vehicles using a roadway during a specified period of time. 2.24 Village The Village of Cottage Grove, Wisconsin. 2.25 Vulnerable Road User A roadway user with greater exposure to injury in a traffic crash, including pedestrians, bicyclists, wheelchair users, children, and older adults. 2.26 WMUTCD The Wisconsin Manual on Uniform Traffic Control Devices. 3. Policy Principles The Village recognizes that effective transportation management requires balancing safety, accessibility, mobility, operational efficiency, and fiscal responsibility. 3.1 Reliability and Long-Term Stewardship Transportation infrastructure represents a significant public investment. Traffic control devices and traffic calming measures should be selected and implemented in a manner that promotes long-term system reliability and sustainability. Consideration will be given to maintenance requirements, lifecycle costs, future roadway improvements, and compatibility with existing infrastructure. 7 3.2 Cost-Effective Use of Public Resources The Village has a responsibility to utilize public funds efficiently. Traffic improvements should provide measurable public benefits while balancing installation costs, maintenance obligations, and long-term operational impacts. 3.3 Customer-Focused Service Residents are often the first to identify evolving traffic concerns within their neighborhoods. The Village is committed to maintaining a transparent and responsive process for evaluating requests and communicating findings. 3.4 Public Service and Community Well-Being Transportation decisions should promote safety, accessibility, and quality of life while considering the needs of motorists, pedestrians, bicyclists, children, older adults, and persons with disabilities. 3.5 Data-Driven Evaluation Traffic concerns will be evaluated using objective information whenever practical. Decisions should be based on measured conditions rather than perception alone. 3.6 Balanced Mobility Traffic calming measures should improve safety without creating unreasonable impacts to emergency services, school transportation, snow removal operations, public transit, or neighboring roadways. Unreasonable impacts may include significant degradation of service levels, excessive operational costs, substantial traffic diversion, impaired emergency access, or other effects that outweigh the anticipated safety benefits. 3.7 Equity and Consistency All traffic concerns should be evaluated using consistent procedures and objective criteria to ensure fair and equitable treatment throughout the Village. 4. Applicability This policy applies to Village-owned and maintained roadways and establishes the criteria and procedures used to evaluate traffic control concerns and residential traffic calming requests. Traffic calming measures may be considered on local and collector streets where speeding, pedestrian concerns, bicycle concerns, or other documented safety issues are present. The policy generally applies to residential streets with posted speed limits of 25 miles per hour or less. 8 Roadways classified as arterial streets, private roads, or streets maintained by another governmental agency are generally not eligible under this policy unless specifically authorized through a construction project, an intergovernmental agreement or other formal arrangement. Common concerns eligible for review include recurring speeding, pedestrian safety issues, bicycle safety concerns, school-zone safety concerns, crash history, sight- distance concerns, near-miss incidents, and requests for stop sign evaluation. 5. Stop Sign Installation and Evaluation The Village recognizes that stop signs are among the most frequently requested traffic control devices. However, stop signs are intended to assign right-of-way at intersections and improve safety by reducing conflict points. Stop signs are not intended to function as traffic calming devices or speed control measures. The installation, modification, or removal of stop signs should be guided by engineering judgment and accepted traffic engineering practices. Evaluations will consider roadway classification, traffic volumes, vehicle speeds, intersection geometry, sight distance, crash history, pedestrian activity, bicycle activity, nearby schools and parks, and overall safety conditions. Minor-road stop control may be appropriate where a lower-volume roadway intersects a higher-volume roadway and right-of-way assignment is necessary. Stop control may also be appropriate where visibility restrictions, crash patterns, or other documented safety concerns support additional traffic control. Multi-way stop control, also called an all-way stop, may be considered where traffic volumes, crash history, pedestrian activity, or restricted sight distance support installation. Any recommendation for all-way stop control should be supported by engineering review and accepted traffic control guidance. Requests for stop signs based solely on perceived speeding, isolated incidents, or neighborhood preference may not warrant installation where engineering judgement and accepted traffic engineering practices does not support additional stop control. 6. Residential Traffic Calming Measures Traffic calming consists of educational, enforcement, operational, and physical roadway measures intended to improve safety and reduce undesirable traffic behaviors. The Village recognizes that no single traffic calming measure is appropriate in every situation and that successful programs often involve multiple complementary strategies. 9 Educational measures may include neighborhood outreach efforts, public safety campaigns, and speed awareness programs intended to improve voluntary compliance with traffic laws. Enforcement measures may be utilized in coordination with law enforcement and can include directed patrols, portable speed feedback trailers, targeted enforcement operations, and other activities intended to address documented traffic violations. Engineering measures may be considered when data demonstrates a continuing traffic concern. Examples may include speed humps, speed tables, curb extensions, traffic circles, median islands, roadway narrowing treatments, pavement marking modifications, mini-roundabouts, and pedestrian refuge treatments. Temporary or pilot projects may be installed when appropriate to evaluate effectiveness before a permanent improvement is considered. Temporary or pilot projects will be evaluated by the Public Works and Utilities Director, or their designee, discussed during Public Works, Properties, and Sustainability Committee meetings, and referred to the Village Board for consideration to implement up to a certain fiscal amount. 7. Minimum Requirements for Review To ensure that Village resources are focused on locations demonstrating documented need and community interest, requests for traffic calming must satisfy minimum submission requirements. A request should include the following: 1. Completed application 2. Description of the traffic concern. Clearly describe how the concern affects safety, mobility, accessibility, or neighborhood quality of life. 3. Identification of the affected roadway 4. Contact information for a neighborhood representative. 5. Optional: Signatures from adjacent households located within the affected area indicating support for the traffic concern can be provided and are encouraged. Submission of a request does not guarantee implementation of traffic calming measures or traffic control modifications. All requests remain subject to engineering evaluation, prioritization, available funding, and staff resources. The Village may also initiate traffic evaluations independently based upon crash history, police observations, roadway conditions, or other identified safety concerns. 10 8. Evaluation Methodology Traffic concerns will be evaluated through a structured and objective process intended to ensure consistency and transparency in decision-making. The Village may collect information related to vehicle speeds, traffic volumes, crash history, roadway geometry, parking conditions, pedestrian activity, bicycle activity, land uses, and visibility limitations. Field observations may also be conducted to better understand traffic operations and roadway user behavior. The evaluation process will consider both quantitative and qualitative information. Engineering judgment may be used to interpret collected data and identify feasible solutions that address observed conditions. Recommendations will balance potential safety benefits with cost, operational impacts, maintenance obligations, emergency response considerations, and community input. Where practical, the Village will seek to identify solutions that address the underlying cause of a traffic concern rather than merely responding to observed symptoms. 9. Prioritization Framework The Village recognizes that available staff time and funding are limited. Accordingly, requests will be prioritized to ensure that locations exhibiting the greatest demonstrated need receive appropriate consideration. Priority rankings should consider the severity of speeding, traffic volumes, crash history, pedestrian activity, bicycle activity, school proximity, infrastructure condition, and implementation feasibility. High-priority locations typically include those exhibiting significant speeding concerns, documented crash patterns, substantial pedestrian activity, vulnerable roadway users, or safety concerns affecting schools and parks. Medium-priority locations generally demonstrate measurable concerns that warrant future attention but do not present the same level of urgency. Low-priority locations typically include those where available data indicates limited safety concerns or where conditions do not support immediate intervention. Priority rankings may be adjusted periodically as new information becomes available or projects are completed. 11 10. Request and Evaluation Process The Village will utilize a standardized process for evaluating traffic concerns. 10.1 Request Submission Residents may submit a traffic concern request using Village-provided application to the Public Works and Utilities Director. 10.2 Initial Screening The Public Works and Utilities Director, in conjunction with the Village’s Engineering Consultant and Chief of Police, are responsible for reviewing submissions to confirm eligibility, roadway jurisdiction, and completeness. Submissions will be reported to the Public Works, Properties, and Sustainability Committee at the meeting following a submission. 10.3 Data Collection Village Staff may conduct speed studies, traffic counts, crash history reviews, field observations, and other assessments necessary to evaluate existing conditions, as time and resources allow. Typical data collection timeline is approximately 60 days. 10.4 Technical Evaluation Collected information will be analyzed to determine whether a documented traffic concern exists and whether corrective measures may be warranted. 10.5 Recommendation Development The Public Works and Utilities Director may prepare a recommendation identifying existing conditions, proposed improvements, potential benefits, operational impacts, maintenance considerations, and estimated costs. The proposed recommendation would then be discussed at a Public Works, Properties, and Sustainability Committee meeting and also potentially at a Law Enforcement Committee (LEC) meeting for review and recommendation to Village Board. The applicant will be made aware in advance of the date, time, and location of the meeting(s) when the request will be discussed. Meetings are held both in person and a virtual hybrid option. 10.6 Community Engagement Where appropriate, residents may be provided with an opportunity to offer feedback through surveys, meetings, notices, or other public engagement activities. 12 11. Installation, Maintenance, and Monitoring Traffic control devices and traffic calming measures may be installed in accordance with applicable engineering standards, manufacturer recommendations, and Village design practices once approved through the proper approval channels. Following installation, the Village may monitor locations to determine whether improvements are functioning as intended. Monitoring may include traffic counts, speed studies, crash reviews, field observations, or resident feedback. The Village is responsible for maintaining installed improvements in a condition that supports their intended function and may modify improvements if unforeseen operational or safety concerns arise. 12. Periodic Review and Removal Traffic conditions evolve as development occurs, travel patterns change, and roadway networks mature. Therefore, installed traffic control devices and traffic calming measures may be reviewed periodically to determine whether they remain appropriate and effective. The Village may modify, replace, upgrade, or remove existing improvements when engineering analysis indicates that conditions have changed, treatment is no longer effective, maintenance costs have become excessive, or alternative solutions would better address identified concerns. Any significant modification should consider updated traffic data, engineering judgment, operational impacts, and community considerations. 13. Documentation The Village will maintain records associated with traffic control and residential traffic calming activities to support transparency, consistency, and informed decision-making. Documentation may include requests submitted by residents, traffic counts, speed studies, crash analyses, engineering evaluations, field observations, public engagement materials, recommendations, installation records, maintenance activities, and post- implementation monitoring data. These records will support future evaluations, assist in project prioritization, preserve institutional knowledge, and facilitate the effective long-term management of the Village transportation system. Residential Traffic Concern & Traffic Calming Request Application Section 1: Request Information Applicant Name________________________________________________ Applicant’s Street Address _______________________________________ Applicant’s Phone Number________________________________________ Applicant’s Email Address ________________________________________ Date of Submission _____________________________________________ Section 2: Location of Concern Street Name(s) or Area to be Evaluated: _______________________________________ Limits of Concerned Area: __________________________________________________ Roadway within Village jurisdiction? ☐ Yes ☐ No ☐ Unsure Section 3: Type of Traffic Concern ☐ Vehicle speeding ☐ Cut-through traffic ☐ Pedestrian safety concern ☐ Bicycle safety concern ☐ School-related safety concern ☐ Park-related safety concern ☐ Stop sign evaluation ☐ Crash history ☐ Near-miss incidents ☐ Accessibility concern ☐ Other: __________ Section 4: Describe the Concern Description: ________________________________________________________________________ ________________________________________________________________________ Section 5: Observed Conditions When does the problem occur? __________________________________ How long has the issue existed? _______________________________ Section 6: Safety Information Observed crashes? ☐ Yes ☐ No Near misses? ☐ Yes ☐ No Additional details: __________________________________________ Section 7: Supporting Documentation ☐ Photos ☐ Videos ☐ Maps ☐ Written Statements ☐ Other Section 8: Applicant Acknowledgment Signature: ____________________ Date: ____________________ Section 9: Opportunity to show Neighborhood Support # Name Address Signature 1 2 3 4 5 6 7 General Instructions: • Submit the completed application and supporting documentation to the Public Works & Utilities Director, Kyela O’Loughlin, PE, at koloughlin@villageofcottagegrove.gov The Village of Cottage Grove, WI Staff Report Memo Date: November 11, 2026 To: Public Works, Properties, and Sustainability Committee From: Kyela O’Loughlin, P.E., Public Works and Utilities Director Jason Anderson, Street Superintendent Subject: Additional Fleet Radios Overview The Village’s two oldest plow trucks, the street sweeper, and the Director’s vehicle currently do not have in-vehicle radios and rely on handheld units for communication. Although the two oldest plow trucks are identified in the Fleet Replacement Schedule, equipping the entire snow and maintenance fleet with in-vehicle radios will improve operational efficiency, communication reliability, and employee safety. In addition, the radios can be removed and reinstalled in future replacement vehicles, allowing the Village to retain the investment over time. This investment will improve communication capabilities across the fleet while enhancing operational efficiency and employee safety during snow operations and other Public Works activities, including an emergency situations. Recommendation Public Works, Properties, and Sustainability Committee recommend approval to the Village Board of a $20,000 for the purchase and installation of four in-vehicle radios for the Public Works fleet. Funding for this purchase will be provided through savings realized from 2026 fleet purchases. Trustee Memo Meeting Date: 11/11/2026 Memo Date: 11/2/2026 To: Public Works, Properties, and Sustainability Committee From: Committee Chair Chris Stoa Subject: Future Planning: Intersection of Progress Dr and Bonnie Rd Background/Overview In 2025, the majority of Bonnie Rd was repaved. At the time, the Public Works Committee held off on making a decision on what to do with the intersection of Progress Dr and Bonnie because we wanted to see what the intersection might look like after the police station project was designed/completed. Additionally, through the Capital Prioritization Process, the Village Board moved up repaving Progress Dr to 2028. It seems prudent to begin to plan for what that intersection might look like before we plan for the reconstruction of Progress Dr. Below is an image of the intersection (with the police station project overlaid). Information I believe that the intersection needs to be shrunk. While recognizing that some trucks do need to navigate it, it is a treacherous intersection for pedestrians, and the wide turn radius causes cars to drive fast when turning. It has been nice seeing people driving a little slower in the area with the (temporary) addition of construction vehicles that are parked on the sides of Bonnie. Still, I believe we should shrink it. Trustee Memo We should start with a pilot paint project to see how it could work. Below is an image showing how simple a pilot could be, allowing us to test out a smaller turn radius: This pilot project will allow us to identify what we’d like the radius to be while still allowing larger trucks to turn. By observing trucks turning (as well as paint wear), we can better understand how tight we can make the turn radius while still allowing trucks to navigate the roads. For the long term, I would like to make the smaller radius permanent. This will lower crossing distances for pedestrians, and slow vehicle traffic instead of allowing cars to take this turn at fairly high speeds. Additionally, lowering the curb radius will reclaim some space on the northeast corner. This would be a perfect opportunity to build something like a veterans memorial, honoring those from Cottage Grove who served in our Armed Forces. What the ultimate layout, look, cost, and funding source of a memorial would look like would ultimately be up to the Village Board, but we can prepare the land for hosting something like this when Progress is repaved. Below is a very rough layout of what a revamped intersection could look like: Trustee Memo Trustee Request/Recommendation Discuss the future of the Bonnie Road/Progress Drive intersection. Director Report MG School Start – Weald Bridge/Taylor/Main Street Intersection Since school began, the Police Department and I have been monitoring traffic flows along Main Street and at the Main Street/Weald Bridge/Taylor intersection. Traffic has significantly improved with communications that have been coordinated between the MG School District and the Village. Parents are encouraged to queue in the “parking lane” along Main Street. This allows for traffic to flow along Main Street. Additionally, traffic patterns have continued to change as we are only seeing a handful of cars queuing on Weald Bridge. The detour route for the CTH BB bridge closure has created additional backups at times on Taylor Street. Once this project has been completed the intersection will continue to be monitored closely. 2027 Traffic Study Following the approval of the budget on November 16 th, I will be signing the 2027 Traffic Study Agreement with GRAEF. Salt Wise Training Public Works staff attended the Salt Wise Training at the end of October. This event was partnered by Dane County Highway Department and provided staff with an opportunity to learn additional best practices in snow and ice control and see a variety of winter maintenance equipment. Engineering Report Quarry Ridge – Phase D The contractor is working through the punch list for the last phase of construction. Village staff have contacted Developer to complete the eastern extension of School Road to meet the requirements of the Developer’s Agreement for Phase C. Amazon Facility The contractor has completed the public utility construction at the Amazon Facility on-site. Off- site improvements on CTH TT and CTH N have been substantially completed and all lanes on CTH TT and CTH N are open to traffic. Additional information can be found on the Village’s website. The contractor is working through remaining punch list items. Public Works, Properties, & Sustainability Committee Director and Engineering Monthly Report – November 11, 2026 HeyDay Cottage Grove The multi-use path was constructed along the HeyDay property in June and construction of the off-site improvements, including turn lanes on Buss Road have been completed. The traffic light improvements at Buss Road and Cottage Grove Road were completed in September. A final walk through and punch list was completed mid-October within the development, and the contractor is working on the punch list items. Juniper Fields Development The developer is working to finalize the remaining items needed prior to mass grading efforts for the first phase of the project, which is anticipated to begin in early November, followed by utility installation. 2026 Street and Pedestrian Improvements Project The project is substantially completed, and all punch list items have been addressed. The final pay application with the remaining retainage is anticipated in the upcoming weeks. Stormwater Utility Feasibility Study The 2027 Stormwater Utility Budget will be discussed at the 5pm Utility Commission Meeting on November 11 th. 2027 Construction Projects – S. Main Street and Ollie Street Reconstruction Strand has started preliminary design for both the reconstruction projects for next year. A Public Information Meeting will be held for both projects on November 5 th. Sustainability Report Below are totals for the MSB Solar and Bakken Park Shelter Solar month by month for 2024 through September 2026. In total, at MSB, the total Alliant invoices have equated to $39,670 and solar production has saved the Village $4,955, approximately 12% over the last 3 years. At Bakken Park, the total Alliant invoices have equated to $1887 and solar production has saved the Village $138, approximately 7%. Alliant - 200 Progress Drive Solar Dates Parallel Generation Bill Amount Production (MWh) 1/11/2024-2/12/2024 -21.92 1371.98 0.93 2/12/24-3/11/24 -203.30 934.70 8.07 3/11/2024-4/10/2024 -183.39 979.84 9.91 4/10/2024-5/9/2024 -199.76 793.10 9.53 5/9/2024-6/13/2024 -315.08 998.15 12.5 6/13/2024-7/11/2024 -220.72 1038.11 12.9 7/11/2024-8/13/2024 -259.47 1133.87 13.8 8/13/2024-9/12/2024 -194.00 1171.92 12.2 9/12/2024-10/10/2024 -118.80 944.30 10.7 10/10/2024-11/8/2024 -73.39 870.72 8.04 11/8/2024-12/10/2024 -26.66 1175.02 3.94 12/10/2024-1/13/2025 -4.07 1424.57 2.74 Total: $ (1,820.56) $ 12,836.28 105.26 Alliant - 200 Progress Drive Solar Dates Parallel Generation Bill Amount Production (MWh) 1/13/2025-2/11/2025 -51.86 1601.02 5.46 2/11/2025-3/11/2025 -59.41 1580.42 4.89 3/11/2025-4/10/2025 -69.22 1262.64 7.33 4/10/2025-5/12/2025 0.37 1429.72 4.58 5/12/2025-6/10/2025 1221.86 4.23 6/10/2025-7/11/2025 9.68 1779.44 4.22 7/11/2025-8/11/2025 -138.87 1421.87 6.54 8/11/2025-9/10/2025 -233.35 1029.54 13.1 9/10/2025-10/09/2025 -136.87 1036.88 11.2 10/9/2025-11/10/2025 -91.18 1131.58 7.9 11/10/2025-12/10/2025 -22.19 1577.41 4.4 12/10/2025-1/12/2026 -5.26 1879.98 1.39 Total: $ (798.16) $ 16,952.36 75.24 *2025 had invoicing amounts updated in May on Alliant’s billing side. Alliant - 200 Progress Drive Solar Dates Parallel Generation Bill Amount Production (MWh) 1/12/2026-2/10/2026 -30.23 1513.34 2.92 2/10/2026-3/10/2026 -105.51 1139.29 6.65 3/10/2026-4/10/2026 -35.41 1218.97 6.06 4/10/2026-5/12/2026 -275.74 909.2 9.33 5/12/2026-6/10/2026 -360.21 820.69 14.8 6/10/2026-7/10/2026 -580.63 993.05 13.8 7/10/2026-8/12/2026 -484.85 1162.77 14.9 8/12/2026-9/11/2026 -339.35 1127.59 12 9/11/2026-10/12/2026 -125.78 1001.73 8.22 October November December Total: $ (2,337.71) $ 9,886.63 88.68 Alliant - Bakken Park Solar Dates Parallel Generation Bill Amount Production (MWh) 1/11/2024-2/12/2024 0.00 48.77 0 2/12/2024-3/12/2024 -9.04 7.79 0.34 3/12/2024-4/11/2024 -9.66 7.72 0.76 4/11/2024-5/10/2024 -5.10 12.06 0.97 5/10/2024-6/12/2024 -13.85 4.98 1.21 6/12/2024-7/11/2024 0.00 323.39 1.21 7/11/2024-8/12/2024 -0.91 18.41 1.29 8/12/2024-9/12/2024 0.00 41.73 1.13 9/12/2024-10/11/2024 0.00 104.87 0.99 10/11/2024-11/11/2024 0.00 112.56 0.77 11/11/2024-12/11/2024 0.00 71.15 0.3 12/11/2024-1/13/2025 0.00 53.32 0.21 Total: $ (38.56) $ 806.75 9.18 Alliant - Bakken Park Solar Dates Parallel Generation Bill Amount Production (MWh) 1/13/2025-2/12/2025 -2.74 15.22 0.42 2/12/2025-3/12/2025 -2.65 14.11 0.3 3/12/2025-4/11/2025 -0.31 0.85 4/11/2025-5/12/2025 -13.52 3.82 0.98 5/12/2025-6/11/2025 -9.80 9.8 1.21 6/11/2025-7/14/2025 0.00 53.47 1.26 7/14/2025-8/12/2025 -5.74 10.78 1.25 8/12/2025-9/11/2025 0.00 48.88 1.13 9/11/2025-10/10/2025 0.00 102.49 0.95 10/10/2025-11/11/2025 0.00 158.46 0.65 11/11/2025-12/11/2025 0.00 107.64 0.35 12/11/2025-1/13/2026 0.00 58.24 0.11 Total $ (34.45) $ 582.60 9.46 Alliant - Bakken Park Solar Dates: Parallel Generation Bill Amount Production (MWh) 1/13/2026-2/11/2026 0.00 34.38 0.28 2/11/2026-3/11/2026 -9.83 12.39 0.52 3/11/2026-4/10/2026 -10.55 13.26 0.79 4/10/2026-5/12/2026 -14.85 10.44 1 6/10/2026-7/10/2026 -18.08 15.83 1.35 5/12/2026-6/10/2026 -7.27 5.5 1.22 7/10/2026-8/12/2026 -5.91 20.46 1.33 8/12/2026-9/11/2026 0.00 200.49 0.36 9/11/2026-10/12/2026 0.00 185.71 0.25 October November December Total: $ (66.49) $ 498.46 $ 7.10

Source: Village of Cottage Grove website. First collected Nov 8, 2026.