Packet
Village of Cottage Grove · Dane County · meeting of Nov 11, 2026 · Agenda packets
Open the original document More from Village of Cottage Grove
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
VILLAGE OF COTTAGE GROVE
NOTICE OF PUBLIC MEETING
Utility Commission
Wednesday, November 11, 2026
5:00 p.m.
This meeting will take place as a hybrid meeting both virtually via Zoom and in person at Village
Hall at 221 E. Cottage Grove Road. If you are utilizing Zoom, please join the meeting from your
computer, tablet or smartphone by visiting https://us06web.zoom.us/j/85433498218?
pwd=m2zZMn7ZPxnJX5qM1WQrPPfHFbr3XF.1. You can also participate via phone by dialing 1
312 626 6799 and use Meeting ID 854 3349 8218# When asked for your Participant ID, just press
#, when asked for the Passcode enter 221.You may also choose to participate by providing public
comment prior to the meeting via email to Village Clerk Lisa Kalata: lkalata@village.cottage-
grove.wi.us. If this is a teleconference, virtual or hybrid meeting, please review the Village of
Cottage Grove’s policy.
Call To Order
Determination Of Quorum And That The Agenda Was Properly Posted
PUBLIC APPEARANCES-Public's Opportunity To Speak
Discuss And Consider The Minutes Of The Utility Commission Meeting On October 14,
2026.
10-14-26 UTILITY COMMISSION MINUTES.PDF
Discuss And Consider Approval Of Vouchers
BILLS LIST.PDF
New Business
Discuss And Consider Adoption Of The 2027 Stormwater Utility Budget Including
Establishing Monthly ERU Rate.
2027 PROPOSED STORMWATER BUDGET.PDF
Discuss And Consider Stormwater Credit Policy.
STORMWATER CREDIT POLICY.NOVEMBER 2026.PDF
Discuss And Consider Creation Of Stormwater Credit Application.
STORMWATER UTILITY CREDIT APPLICATION - COTTAGE GROVE.PDF
Discuss And Consider The Sewer Replacement Fund.
SEWER EQUIPMENT REPLACEMENT FUND_2027..PDF
Director's And Engineering Report
UTILITY DIRECTORS REPORT 11112026.PDF
EXECUTIVE SUMMARY 2026.10.PDF
Future Agenda Items
Adjournment
This agenda has been prepared by Staff and approved by the by the Chair of the Utility
Commission for use at the meeting as listed above. Any item on the agenda is subject to final
action. Notice: Persons needing special accommodation should call 608 -839-4704 at least 24
hours prior to the meeting. It is possible that members of and possibly a quorum of members of
other governmental bodies may attend the above stated meeting to gather information; no action
will be taken by any governmental body at the above-stated meeting other than the governmental
body specifically referred to above in this notice.
1.
2.
3.
4.
Documents:
5.
Documents:
6.
6.I.
Documents:
6.II.
Documents:
6.III.
Documents:
6.IV.
Documents:
7.
Documents:
8.
9.
VILLAGE OF COTTAGE GROVE
NOTICE OF PUBLIC MEETING
Utility Commission
Wednesday, November 11, 2026
5:00 p.m.
This meeting will take place as a hybrid meeting both virtually via Zoom and in person at Village
Hall at 221 E. Cottage Grove Road. If you are utilizing Zoom, please join the meeting from your
computer, tablet or smartphone by visiting https://us06web.zoom.us/j/85433498218?
pwd=m2zZMn7ZPxnJX5qM1WQrPPfHFbr3XF.1. You can also participate via phone by dialing 1
312 626 6799 and use Meeting ID 854 3349 8218# When asked for your Participant ID, just press
#, when asked for the Passcode enter 221.You may also choose to participate by providing public
comment prior to the meeting via email to Village Clerk Lisa Kalata: lkalata@village.cottage-
grove.wi.us. If this is a teleconference, virtual or hybrid meeting, please review the Village of
Cottage Grove’s policy.
Call To Order
Determination Of Quorum And That The Agenda Was Properly Posted
PUBLIC APPEARANCES-Public's Opportunity To Speak
Discuss And Consider The Minutes Of The Utility Commission Meeting On October 14,
2026.
10-14-26 UTILITY COMMISSION MINUTES.PDF
Discuss And Consider Approval Of Vouchers
BILLS LIST.PDF
New Business
Discuss And Consider Adoption Of The 2027 Stormwater Utility Budget Including
Establishing Monthly ERU Rate.
2027 PROPOSED STORMWATER BUDGET.PDF
Discuss And Consider Stormwater Credit Policy.
STORMWATER CREDIT POLICY.NOVEMBER 2026.PDF
Discuss And Consider Creation Of Stormwater Credit Application.
STORMWATER UTILITY CREDIT APPLICATION - COTTAGE GROVE.PDF
Discuss And Consider The Sewer Replacement Fund.
SEWER EQUIPMENT REPLACEMENT FUND_2027..PDF
Director's And Engineering Report
UTILITY DIRECTORS REPORT 11112026.PDF
EXECUTIVE SUMMARY 2026.10.PDF
Future Agenda Items
Adjournment
This agenda has been prepared by Staff and approved by the by the Chair of the Utility
Commission for use at the meeting as listed above. Any item on the agenda is subject to final
action. Notice: Persons needing special accommodation should call 608 -839-4704 at least 24
hours prior to the meeting. It is possible that members of and possibly a quorum of members of
other governmental bodies may attend the above stated meeting to gather information; no action
will be taken by any governmental body at the above-stated meeting other than the governmental
body specifically referred to above in this notice.
1.
2.
3.
4.
Documents:
5.
Documents:
6.
6.I.
Documents:
6.II.
Documents:
6.III.
Documents:
6.IV.
Documents:
7.
Documents:
8.
9.
VILLAGE OF COTTAGE GROVE
UTIITY COMMISSION
Wednesday, October 14, 2026
MINUTES
1. Call to order
Rogers called the Utility Commission meeting to order at 5:00 pm. This was a hybrid meeting.
2. Determination of quorum and that the agenda was properly posted.
It was determined there was a quorum present, and that the agenda was properly posted. Commission members
present were Charlie Rogers, Chris Stoa, Jon Russell, Joanna Williams and Mike Hackel. Staff members present
were Director of Public Works and Utilities Kyela O’Loughlin, Village Engineer Josh Straka, and Village Clerk Lisa
Kalata..
3. PUBLIC APPEARANCES -Alex Jushchyshyn
4. Discuss and Consider the Minutes of The Utility Commission Meeting on September 16, 2026.
Motion by Williams to approve September 16, 2026, meeting minutes, seconded by Hackel. Motion carried with
a voice vote 5-0-0.
5. Discuss and Consider Approval of Vouchers.
Motion by Rogers to approve the vouchers as presented, seconded by Russell. Motion carried with a voice vote
of 5-0-0.
6. New Business
6.I. Discuss and consider additional soil evaluation for utility construction for the 2027 reconstruction
projects on Ollie Street and Main Street.
Motion by Rogers to approve the additional soil evaluation for utility construction for the 2027 reconstruction
projects on Ollie Street and Main Street as presented, seconded by Hackel. Motion carried with a voice vote of 5-
0-0.
7. Director’s and Engineering Report
O’Loughlin gave a brief overview of the report.
8. Future agenda items.- Stormwater Utility budget.
9. Adjournment
Motion by Stoa to adjourn at 5:16 p.m., seconded by Williams. Motion carried with a voice vote of 5-0-0.
Lisa Kalata, Village Clerk
Village of Cottage Grove
Approved:
These minutes represent the general subject matter discussed in this meeting but do not reflect a verbatim documentation of the
subjects and conversations that took place.
VILLAGE OF COTTAGE GROVE Payment Approval Report - A pproval Rpt for Utility Comm with only Utility Accts Page: 1
Report dates: 10/9/2026-11/5/2026 Nov 05, 2026 09:52AM
Report Criteria:
Detail report.
Invoices with totals above $0.00 included.
Paid and unpaid invoices included.
[Report].GL Account and Title = "60000000000"-"60199999999"
Vendor Vendor Name Invoice Number Description Invoice D ate Net Amount Paid Date Paid Voided
Invoice Amount
600-18311
87 Dane County Treasurer COT0926 Well 2 11/03/2026 110.8 1 110.81 11/03/2026
6791 Strand Associates Inc 0244664 Well 2 Design 11/03/ 2026 14,917.10 14,917.10 11/03/2026
Total 600-18311: 15,027.91 15,027.91
600-21900
7414 Parisi Construction LLC 250054-006 Gaston Rd-CTH TT Watermain 10/20/2026 25,930.37 25,930.37 10/20/2026
Total 600-21900: 25,930.37 25,930.37
600-37300
7261 Vital Signs Inc 26489 Logo Signs for Sweeper 11/03 /2026 48.00 48.00 11/03/2026
Total 600-37300: 48.00 48.00
600-39501
6791 Strand Associates Inc 0244619 Gaston/TT Water Mai n Looping 11/03/2026 916.70 916.70 11/03/2026
Total 600-39501: 916.70 916.70
600-39509
6481 CGC Inc 75654 Main, Ollie, Vilas Engineering Wor 10/20/2026 3,916.18 3,916.18 10/20/2026
6791 Strand Associates Inc 0244620 Ollie St Reconstruc tion 11/03/2026 6,436.64 6,436.64 11/03/2026
6791 Strand Associates Inc 0245117 CTH N/Main Reconstr uction 11/03/2026 4,387.40 4,387.40 11/03/2026
Total 600-39509: 14,740.22 14,740.22
600-60602-340
6807 SJE LLC CD99639332 TopView Support 10/20/2026 445.0 0 445.00 10/20/2026
Total 600-60602-340: 445.00 445.00
600-60605-340
243 ADS Mechanical 32179 Well 3-4 HVAC Maintenance 10/2 0/2026 450.00 450.00 10/20/2026
Total 600-60605-340: 450.00 450.00
600-60622-340
31 Alliant Energy/WPL 31-102026W Wells & Water Towers 1 0/20/2026 6,779.71 6,779.71 10/20/2026
Total 600-60622-340: 6,779.71 6,779.71
600-60631-210
6121 Hawkins Inc 7600189 Chemicals 11/03/2026 864.09 864. 09 11/03/2026
Total 600-60631-210: 864.09 864.09
600-60632-340
6373 WI State Laboratory of Hygiene 30053697 Water Tes ting 10/20/2026 1,804.00 1,804.00 10/20/2026
6373 WI State Laboratory of Hygiene 30053697 Fluoride 1 0/20/2026 31.00 31.00 10/20/2026
VILLAGE OF COTTAGE GROVE Payment Approval Report - A pproval Rpt for Utility Comm with only Utility Accts Page: 2
Report dates: 10/9/2026-11/5/2026 Nov 05, 2026 09:52AM
Vendor Vendor Name Invoice Number Description Invoice D ate Net Amount Paid Date Paid Voided
Invoice Amount
Total 600-60632-340: 1,835.00 1,835.00
600-60650-340
243 ADS Mechanical 32179 Tower 2 HVAC Maintenance 10/20 /2026 112.50 112.50 10/20/2026
Total 600-60650-340: 112.50 112.50
600-60651-340
219 Homburg Equipment Inc 16184 Pick-Up Charge 11/03/20 26 100.00 100.00 11/03/2026
Total 600-60651-340: 100.00 100.00
600-60654-340
150 USA Blue Book INV01202035 Hydrant Parts 11/03/2026 6 92.90 692.90 11/03/2026
150 USA Blue Book INV01202286 Hydrant Supplies 11/03/20 26 307.80 307.80 11/03/2026
Total 600-60654-340: 1,000.70 1,000.70
600-60903-340
4260 WCMA 2026 WCMA S Women's Leadership Seminar Sm 11/03/2026 57.75 57.75 11/03/2026
Total 600-60903-340: 57.75 57.75
600-60920-340
31 Alliant Energy/WPL 31-102026MB Municipal Buildings 1 0/20/2026 185.60 185.60 10/20/2026
6480 Cintas 4285300920 Mats at MSB 11/03/2026 16.65 16.65 11/03/2026
6480 Cintas 4285300987 Mats at Village Hall 10/20/2026 1 1.61 11.61 10/20/2026
212 Gordon Flesch Co Inc IN15811897 Copier Contract Ch arges 11/03/2026 35.60 35.60 11/03/2026
12 Quill LLC 5089993 Office Supplies 11/03/2026 11.00 11. 00 11/03/2026
4260 WCMA 2026 WCMA S Women's Leadership Seminar Cu 11/03/2026 31.25 31.25 11/03/2026
Total 600-60920-340: 291.71 291.71
600-60923-210
366 Axley Brynelson LLP 1076877 Utility Connection Leg al Support 10/20/2026 104.00 104.00 10/20/2026
4995 Ehlers & Associates Inc INV108536 2027 FMP Update 10/20/2026 2,250.00 2,250.00 10/20/2026
4995 Ehlers & Associates Inc INV108772 Water LRCFA 10/2 0/2026 3,750.00 3,750.00 10/20/2026
6906 Johnson Block & Company Inc 539486 October Manage d Services 10/20/2026 2,330.25 2,330.25 10/20/2026
4428 Stafford Rosenbaum LLP 219286 General Legal 11/03/ 2026 2,555.48 2,555.48 11/03/2026
6791 Strand Associates Inc 0244614 General Engineering Support 11/03/2026 1,089.17 1,089.17 11/03/2026
6791 Strand Associates Inc 0244615 Utility Support - Water Quality Ass 11/03/2026 2,148.13 2,148.13 11/03/2026
Total 600-60923-210: 14,227.03 14,227.03
600-60930-340
2688 Ace Hardware 170024-09 Ace September Charges 10/20 /2026 23.98 23.98 10/20/2026
Total 600-60930-340: 23.98 23.98
600-60933-380
6883 Halron Lubricants Inc 1776067-00 Vehicle Maintena nce 10/20/2026 127.74 127.74 10/20/2026
6883 Halron Lubricants Inc 1778887-00 Antifreeze 11/03/ 2026 4.36 4.36 11/03/2026
6883 Halron Lubricants Inc 1779489-00 Vehicle Maintena nce 11/03/2026 42.73 42.73 11/03/2026
6883 Halron Lubricants Inc 1780716-00 Antifreeze Retur n 11/03/2026 4.36- 4.36- 11/03/2026
6883 Halron Lubricants Inc 1780846-00 Drum Return 11/03 /2026 3.00- 3.00- 11/03/2026
4261 Lakeside International LLC 8341711P Fleet Mainten ance 10/20/2026 224.01 224.01 10/20/2026
VILLAGE OF COTTAGE GROVE Payment Approval Report - A pproval Rpt for Utility Comm with only Utility Accts Page: 3
Report dates: 10/9/2026-11/5/2026 Nov 05, 2026 09:52AM
Vendor Vendor Name Invoice Number Description Invoice D ate Net Amount Paid Date Paid Voided
Invoice Amount
4261 Lakeside International LLC 8341906P Fleet Mainten ance 10/20/2026 216.29 216.29 10/20/2026
7481 Madison Spring Inc 6077 Fleet Maintenance 11/03/20 26 253.29 253.29 10/20/2026
5921 Mid-State Equipment P12711 Fleet Maintenance 11/03 /2026 43.59 43.59 11/03/2026
167 Napa Auto Parts 066253 Fleet Maintenance 10/20/2026 153.59 153.59 10/09/2026
167 Napa Auto Parts 066390 Fleet Maintenance 10/20/2026 5.38 5.38 10/09/2026
167 Napa Auto Parts 068501 Fleet Maintenance Supplies 1 0/20/2026 23.25 23.25 10/20/2026
7459 Truck Country of Wisconsin Inc R20114358:01 DOT I nspection 11/03/2026 17.85 17.85 11/03/2026
7459 Truck Country of Wisconsin Inc R201145009:0 DOT Inspection 11/03/2026 17.85 17.85 11/03/2026
7459 Truck Country of Wisconsin Inc R201145276:0 DOT Inspection & Repair 11/03/2026 54.93 54.93 11/03/20 26
7459 Truck Country of Wisconsin Inc R201145325:0 DOT Inspection 11/03/2026 17.85 17.85 11/03/2026
7459 Truck Country of Wisconsin Inc R201145373:0 DOT Inspection 11/03/2026 17.85 17.85 11/03/2026
Total 600-60933-380: 1,213.20 1,213.20
600-60933-385
3 Landmark Services Cooperative 3-102026 September Fue l 10/20/2026 353.94 353.94 10/20/2026
Total 600-60933-385: 353.94 353.94
600-60935-340
2688 Ace Hardware 170024-09 Ace September Charges 10/20 /2026 34.84 34.84 10/20/2026
243 ADS Mechanical 32177 Police Dept HVAC Maintenance 1 0/20/2026 101.25 101.25 10/20/2026
243 ADS Mechanical 32178 Public Works HVAC Maintenance 10/20/2026 244.50 244.50 10/20/2026
243 ADS Mechanical 32180 MSB HVAC Maintenance 10/20/202 6 96.00 96.00 10/20/2026
243 ADS Mechanical 32181 Fitness Area HVAC Maintenance 10/20/2026 34.50 34.50 10/20/2026
243 ADS Mechanical 32187 Village Hall HVAC Maintenance 10/20/2026 129.00 129.00 10/20/2026
243 ADS Mechanical 32188 MSB HVAC Maintenance 10/20/202 6 63.00 63.00 10/20/2026
33 Badger Welding Supplies Inc 3958446 Monthly Cylinde r Lease 10/20/2026 2.40 2.40 10/20/2026
6480 Cintas 5366035507 First Aid Kit at MSB 10/20/2026 2 8.22 28.22 10/20/2026
6480 Cintas 5366035508 First Aid Kit at Village Hall 10 /20/2026 5.92 5.92 10/20/2026
5220 Crystal Cleaners Inc 35300 September Cleaning at MSB 10/20/2026 90.30 90.30 10/20/2026
5220 Crystal Cleaners Inc 35302 September Cleaning at Village Hal 10/20/2026 64.00 64.00 10/20/2026
4458 OReilly Auto Parts 4331-137136 Shop Supplies 10/20 /2026 2.25 2.25 10/20/2026
4458 OReilly Auto Parts 4331-137170 Shop Supplies 10/20 /2026 9.45 9.45 10/20/2026
Total 600-60935-340: 905.63 905.63
601-37300
7261 Vital Signs Inc 26489 Logo Signs for Sweeper 11/03 /2026 48.00 48.00 11/03/2026
Total 601-37300: 48.00 48.00
601-39500
6481 CGC Inc 75654 Main, Ollie, Vilas Engineering Wor 10/20/2026 3,916.17 3,916.17 10/20/2026
6791 Strand Associates Inc 0244620 Ollie St Reconstruc tion 11/03/2026 6,436.64 6,436.64 11/03/2026
6791 Strand Associates Inc 0245117 CTH N/Main Reconstr uction 11/03/2026 4,113.19 4,113.19 11/03/2026
Total 601-39500: 14,466.00 14,466.00
601-60821-221
31 Alliant Energy/WPL 31-102026LS Lift Stations 10/20/2 026 3,170.69 3,170.69 10/20/2026
Total 601-60821-221: 3,170.69 3,170.69
601-60822-222
37 Madison Metro Sewerage Dist INV-000059 Quarter 3/20 26 - Sewer Service 11/03/2026 283,626.36 283,626.36 11/ 03/2026
VILLAGE OF COTTAGE GROVE Payment Approval Report - A pproval Rpt for Utility Comm with only Utility Accts Page: 4
Report dates: 10/9/2026-11/5/2026 Nov 05, 2026 09:52AM
Vendor Vendor Name Invoice Number Description Invoice D ate Net Amount Paid Date Paid Voided
Invoice Amount
Total 601-60822-222: 283,626.36 283,626.36
601-60828-385
3 Landmark Services Cooperative 3-102026 September Fue l 10/20/2026 353.94 353.94 10/20/2026
Total 601-60828-385: 353.94 353.94
601-60831-340
6791 Strand Associates Inc 0245118 Vilas Sanitary Sewe r Crossing 11/03/2026 4,583.36 4,583.36 11/03/2026
Total 601-60831-340: 4,583.36 4,583.36
601-60832-340
6807 SJE LLC CD99639332 TopView Support 10/20/2026 445.0 0 445.00 10/20/2026
Total 601-60832-340: 445.00 445.00
601-60834-340
2688 Ace Hardware 170024-09 Ace September Charges 10/20 /2026 34.84 34.84 10/20/2026
243 ADS Mechanical 32177 Police Dept HVAC Maintenance 1 0/20/2026 101.25 101.25 10/20/2026
243 ADS Mechanical 32178 Public Works HVAC Maintenance 10/20/2026 244.50 244.50 10/20/2026
243 ADS Mechanical 32179 110 S Main St Lift Station Mainten 10/20/2026 100.00 100.00 10/20/2026
243 ADS Mechanical 32180 MSB HVAC Maintenance 10/20/202 6 96.00 96.00 10/20/2026
243 ADS Mechanical 32181 Fitness Area HVAC Maintenance 10/20/2026 34.50 34.50 10/20/2026
243 ADS Mechanical 32186 4195 Vilas Rd Lift Station HVAC 10/20/2026 750.00 750.00 10/20/2026
243 ADS Mechanical 32187 Village Hall HVAC Maintenance 10/20/2026 129.00 129.00 10/20/2026
243 ADS Mechanical 32188 MSB HVAC Maintenance 10/20/202 6 63.00 63.00 10/20/2026
33 Badger Welding Supplies Inc 3958446 Monthly Cylinde r Lease 10/20/2026 2.40 2.40 10/20/2026
5220 Crystal Cleaners Inc 35300 September Cleaning at MSB 10/20/2026 90.30 90.30 10/20/2026
5220 Crystal Cleaners Inc 35302 September Cleaning at Village Hal 10/20/2026 64.00 64.00 10/20/2026
6883 Halron Lubricants Inc 1776067-00 Vehicle Maintena nce 10/20/2026 127.74 127.74 10/20/2026
6883 Halron Lubricants Inc 1778887-00 Antifreeze 11/03/ 2026 4.36 4.36 11/03/2026
6883 Halron Lubricants Inc 1779489-00 Vehicle Maintena nce 11/03/2026 42.73 42.73 11/03/2026
6883 Halron Lubricants Inc 1780716-00 Antifreeze Retur n 11/03/2026 4.36- 4.36- 11/03/2026
6883 Halron Lubricants Inc 1780846-00 Drum Return 11/03 /2026 3.00- 3.00- 11/03/2026
4261 Lakeside International LLC 8341711P Fleet Mainten ance 10/20/2026 224.01 224.01 10/20/2026
4261 Lakeside International LLC 8341906P Fleet Mainten ance 10/20/2026 216.29 216.29 10/20/2026
7481 Madison Spring Inc 6077 Fleet Maintenance 11/03/20 26 253.29 253.29 10/20/2026
5921 Mid-State Equipment P12711 Fleet Maintenance 11/03 /2026 43.59 43.59 11/03/2026
167 Napa Auto Parts 066253 Fleet Maintenance 10/20/2026 153.59 153.59 10/09/2026
167 Napa Auto Parts 066390 Fleet Maintenance 10/20/2026 5.38 5.38 10/09/2026
167 Napa Auto Parts 068501 Fleet Maintenance Supplies 1 0/20/2026 23.25 23.25 10/20/2026
4458 OReilly Auto Parts 4331-137136 Shop Supplies 10/20 /2026 2.25 2.25 10/20/2026
4458 OReilly Auto Parts 4331-137170 Shop Supplies 10/20 /2026 9.45 9.45 10/20/2026
7459 Truck Country of Wisconsin Inc R20114358:01 DOT I nspection 11/03/2026 17.85 17.85 11/03/2026
7459 Truck Country of Wisconsin Inc R201145009:0 DOT Inspection 11/03/2026 17.85 17.85 11/03/2026
7459 Truck Country of Wisconsin Inc R201145276:0 DOT Inspection & Repair 11/03/2026 54.93 54.93 11/03/20 26
7459 Truck Country of Wisconsin Inc R201145325:0 DOT Inspection 11/03/2026 17.85 17.85 11/03/2026
7459 Truck Country of Wisconsin Inc R201145373:0 DOT Inspection 11/03/2026 17.85 17.85 11/03/2026
Total 601-60834-340: 2,934.69 2,934.69
601-60850-340
31 Alliant Energy/WPL 31-102026MB Municipal Buildings 1 0/20/2026 185.60 185.60 10/20/2026
6480 Cintas 4285300920 Mats at MSB 11/03/2026 16.65 16.65 11/03/2026
6480 Cintas 4285300987 Mats at Village Hall 10/20/2026 1 1.61 11.61 10/20/2026
VILLAGE OF COTTAGE GROVE Payment Approval Report - A pproval Rpt for Utility Comm with only Utility Accts Page: 5
Report dates: 10/9/2026-11/5/2026 Nov 05, 2026 09:52AM
Vendor Vendor Name Invoice Number Description Invoice D ate Net Amount Paid Date Paid Voided
Invoice Amount
6480 Cintas 5366035507 First Aid Kit at MSB 10/20/2026 2 8.22 28.22 10/20/2026
6480 Cintas 5366035508 First Aid Kit at Village Hall 10 /20/2026 5.92 5.92 10/20/2026
212 Gordon Flesch Co Inc IN15811897 Copier Contract Ch arges 11/03/2026 35.60 35.60 11/03/2026
12 Quill LLC 5089993 Office Supplies 11/03/2026 11.00 11. 00 11/03/2026
4260 WCMA 2026 WCMA S Women's Leadership Seminar Cu 11/03/2026 31.25 31.25 11/03/2026
4260 WCMA 2026 WCMA S Women's Leadership Seminar Sm 11/03/2026 57.75 57.75 11/03/2026
Total 601-60850-340: 383.60 383.60
601-60852-210
366 Axley Brynelson LLP 1076877 Utility Connection Leg al Support 10/20/2026 104.00 104.00 10/20/2026
4995 Ehlers & Associates Inc INV108536 2027 FMP Update 10/20/2026 2,250.00 2,250.00 10/20/2026
4995 Ehlers & Associates Inc INV108772 Sewer LRCFA 10/2 0/2026 3,750.00 3,750.00 10/20/2026
6906 Johnson Block & Company Inc 539486 October Manage d Services 10/20/2026 2,330.25 2,330.25 10/20/2026
4428 Stafford Rosenbaum LLP 219286 General Legal 11/03/ 2026 2,555.48 2,555.48 11/03/2026
6791 Strand Associates Inc 0244614 General Engineering Support 11/03/2026 1,089.17 1,089.17 11/03/2026
Total 601-60852-210: 12,078.90 12,078.90
Grand Totals: 407,413.98 407,413.98
Dated: ________________________________ ______________________
Mayor: ________________________________ ______________________
City Council: __________________________________ ____________________
______________________________________________________
______________________________________________________
______________________________________________________
______________________________________________________
______________________________________________________
City Recorder: ____________________________________ _________________
Report Criteria:
Detail report.
Invoices with totals above $0.00 included.
Paid and unpaid invoices included.
[Report].GL Account and Title = "60000000000"-"60199999999"
Village of Cottage Grove, WI
2027 Budget Request
Meeting Date: November 11, 2026
Memo Date: November 3, 2026
To: Utility Commission
From: Kyela O’Loughlin - Director of Public Works and Utilities
Cameron Sawyer – Assistant Administrator/Finance Director
Subject: 2027 Budget Request - Stormwater
Revenues:
User Fees ($764,688) – At $8.90 per ERU we are estimating to collect $764,688 of revenue to support
stormwater operations. This includes a reduction of revenue based on the proposed credit policy. Of the
monthly fee $1.58 would go towards fixed base costs, $4.25 goes towards operating and maintenance,
and $3.07 goes towards current and future capital reinvestment.
Penalty Revenue ($1,500) – Using historical data from water and sewer billing we estimated the
anticipated $1,500 in additional revenue from delinquent payments.
Interest Income ($15,000) – Estimating based on current/projected interest rates.
Expenses:
Transportation expenses ($9,500) – Fuel for street sweeper and proportionate share of other shared
equipment. Estimated based on diesel prices above $6.00 throughout 2027.
Maintenance of collection system ($300,000) – Of the total budget $50,000 would be to address
current minor stormwater maintenance. The remaining $250,000 would be saved for a future
stormwater pond dredging project, which is considered a major maintenance. It is estimated it will take
approx. 4 years to save up for a stormwater pond dredging project at an estimated cost of $1,000,000.
Major maintenance cost such as dredging are not considered capital projects and therefore not
captured through depreciation.
Maintenance of general plant equipment ($10,000) – New brooms and parts for the street sweeper as
needed and proportionate share of other shared equipment.
Administrative and general ($168,789) – Wages and benefits related to street sweeping, maintaining
stormwater facilities, administrative oversight, regulatory and compliance fees and general supplies.
Outside services employed ($37,200) – GIS, technology support, annual audit, engineering support,
legal fees, utility locates, and long-term cash flow analysis.
Depreciation ($265,000) – Recovery based on useful life of stormwater infrastructure. Most stormwater
infrastructure useful life is 40 years and the street sweeper is estimated to be between 5-7 years.
Accounting for depreciation recapture will limit need to borrow for capital projects. No rate of return
was built into the stormwater ERU rate. PSC ROI for Water is 6.50% and UC ROI for Sewer is 2.50%.
Storm Utility
Proposed Budget
2027
Account No Title Budget
Operating Revenue
User Fees
602-46324-000 Stormwater Fees 764,688
Total User Fees 764,688
Other
602-46321-000 Penalty Revenue 1,500
Total Other 1,500
Operating Revenue Total 766,188
Operating Expenses
Operation and maintenance
Transportation expenses
602-53440-385 Equipment/Veh Fuel 9,500
Total Transportation expenses 9,500
Maintenance of collection system
602-53440-360 Operating and Supplies - collection system 300,000
Total maintenance of collection system 300,000
Maintenance of general plant equipment
602-53440-370 Gen plt mt bld/eq operating 10,000
Total of general plan equipment 10,000
Administrative and general salaries
602-53440-110 Salaries 35,430
602-53440-115 Wages 32,472
602-53440-116 Overtime 1,745
602-53440-151 FICA 5,325
602-53440-152 Retirement 5,044
602-53440-153 Dental Insurance 1,288
602-53440-154 Health Insurance 13,242
602-53440-155 Life Insurance 243
602-53440-340 Operating and Supplies 52,000
602-53440-350 Stormwater regulatory fees 22,000
168,789
Outside services employed
602-53440-140 Utility commission Per Diem 500
602-53440-210 Professional Services 31,000
602-53440-510 Property and Liability Ins 3,400
602-53440-511 Workers Compensation Ins 2,300
Total Outside services employed 37,200
Total Operation and maintenance 525,489
Depreciation and amortization
Deprecation
602-53440-540 Depreciation Expense 265,000
Total Deprecation 265,000
Operating Expenses 790,489
Operating Income (Loss) (24,301)
Nonoperating Revenue (Expense)
602-48110-000 Interest on investments 15,000
602-58200-622 Interest on debt -
602-58200-000 Debt issuance costs -
Total Nonoperating Revenue (Expense) 15,000
Contributions and transfers
602-46423-000 Contributions for Construction -
Total Contributions and transfers -
Net Income (9,301)
1
Department of Public Works and Utilities
DRAFT NOVEMBER 2026
2026
Stormwater Utility Credit Policy
POLICY, GUIDELINES, AND PROCEDURE
PREPARED BY: KYELA O'LOUGHLIN, PE – PUBLIC WORKS AND UTILITIES DIRECTOR
2
Table of Contents
Introduction ..................................................................................................................... 3
1. Overview of Stormwater Utility .................................................................................... 3
2. Stormwater Utility Rate Structure ................................................................................ 4
3. Corrections, Adjustments, Credits, and Exemptions ................................................... 5
A. Corrections ........................................................................................................... 5
B. Adjustments .......................................................................................................... 6
C. Credits .................................................................................................................. 6
1.0 Definition ....................................................................................................... 6
2.0 Fee Credit Criteria ......................................................................................... 7
3.0 Maximum Credit ............................................................................................ 9
4.0 Application of Credits .................................................................................... 9
D. Exemptions ......................................................................................................... 11
E. Right of Access ................................................................................................... 11
F. Appeals .............................................................................................................. 11
4. Application Procedures and Requirements ............................................................... 12
A. Correction Applications ....................................................................................... 12
B. Adjustment Applications ..................................................................................... 13
C. Credit Applications .............................................................................................. 13
3
Introduction
On October 20, 2026, the Cottage Grove Village Board adopted an ordinance creating a
Stormwater Utility. In establishing the stormwater utility, the Village recognized that
certain properties may have less impact on stormwater utility costs than others in a
similar rate class, either because of structural or non-structural stormwater management
practices property owners have implemented on-site. As a result, the Village has
developed a Stormwater Credit System to provide owners of such properties with the
opportunity to apply for stormwater utility credits. This document summarizes policies
and procedures for determining eligibility for stormwater utility credits.
1. Overview of Stormwater Utility
The Village of Cottage Grove currently owns and maintains an extensive network
of streets, storm sewers, d rainage structures such as inlets and manholes,
greenways, and detention basins. Much of the existing drainage system is
aging and in need of repair. In addition, increasing emphasis by the United States
Environmental Protection Agency (USEPA) and Wisconsin Department of Natural
Resources (WDNR) on impacts of stormwater runoff-borne pollutants on waters
of the state has increased, and will likely continue to increase, local administrative
and construction costs.
To provide a means of funding needed maintenance and improvements to the
Village’s stormwater management system, the Village has created a stormwater
utility. The fee structure for the stormwater utility is based on the amount of
“impervious area” on a land parcel. Impervious areas are areas where the amount
of seepage into the ground is restricted because of the presence of hard surfaces
such as rooftops, parking lots, or driveways. Because seepage is limited, a higher
proportion of rainfall or snowmelt drains from the land parcel to the Village’s
drainage system than would on from a parcel having a vegetative cover. As a
result, the cost of constructing and maintaining the Village’s drainage system is
typically higher downstream from areas with a greater amount of impervious areas.
Under the Village’s stormwater utility, a property owner having a greater amount of
impervious area will typically pay a proportionally higher fee than a property owner
with a lower amount of impervious area because the impact of their land use on the
stormwater system is greater. For example, a commercial establishment having eight
times the amount of impervious area of a typical residential property would pay a
user fee eight times higher than that of a residential property owner.
Responsibilities of the stormwater utility include the following:
A. Develop and administer programs and practices to reduce sediment, heavy
4
metals, pesticides, nutrients, bacteria, and oxygen-demanding organic waste from
pollutant “source areas” that have been recognized as a cause of water quality
degradation in the Village’s creeks, drainage ways, and other water resources.
These programs and practices are necessary for compliance with mandated EPA
and DNR nonpoint source pollution control rules and local stormwater
management and erosion control ordinances.
B. Fund and administer stormwater management operation and maintenance
activities. Activities include cleaning and routine repair of ditches, detention basins,
greenways, storm sewers, catch basins, manholes, streambanks and associated
facilities, street swee ping, leaf collection, and construction of stormwater
treatment, detention, and conveyance facilities serving a public purpose.
C. Respond to customer billing and service inquiries.
2. Stormwater Utility Rate Structure
Stormwater service charges are based on Equivalent Runoff Units (ERU). One ERU
equals the average impervious area on a typical residential property. Single- family
residential parcels are billed upon a three- tiered approach. In Cottage Grove, one ERU
is eq uivalent to approximately 4,065 square feet of impervious area. The fee for
nonresidential parcels is based on the number of ERUs. The number of ERUs is
estimated by dividing the total estimated impervious area on the parcel by the typical
residential impervious area. Appropriate credits will be provided to nonresidential parcels
that do not fully utilize Village stormwater management facilities.
Cottage Grove’s Stormwater Utility rate structure includes the following customer rate
classes:
1. Residential–single family unit - Tier 1 less than 3,650 SF of impervious surface and
would equal to .9 ERU.
2. Residential–single family unit - Tier 2 is between 3,650 – 5,100 SF of impervious
surface and equal to 1 ERU
3. Residential–single family unit - Tier 3 is greater than 5,100 SF of im pervious
surface and would equal to 1.25 ERU.
4. Residential–duplex: 0.67 ERU multiplied by each dwelling unit.
5. Residential–multifamily: (including apartments greater than or equal to 3 Units,
Condominiums, and Mobile Homes). The charge per unit shall be calculated by
dividing the number of ERUs calculated for the entire property by the number of
units existing on the property
6. Nonresidential–one ERU times a factor obtained by dividing the total impervious
area of the property by the square footage equivalent for one ERU. Such
5
impervious area shall be determined based upon the best information reasonably
available. The result shall be rounded to the nearest one-tenth (0.1). The minimum
charges for any nonresidential parcel shall be equal to the rate for one (1.0) ERU,
unless it contains no impervious surface.
7. Undeveloped–no stormwater charge shall be assigned to undeveloped land.
The stormwater user fee for each rate class includes three distinct components:
a. Base Component: The base component includes the Stormwater Utility’s
estimated annual administrative and management costs, water quality costs, and
other miscellaneous costs.
b. Operation and Maintenance (O&M) Component: The O&M component includes
the utility’s estimated annual operation and maintenance costs for the Village’s
stormwater management system, including storm sewer and detention basin
maintenance, street sweeping, and other operational components.
c. Capital and Debt Service Component: This includes capital costs and debt service
payments for the Village’s stormwater management system.
The rate for each ERU is determined by dividing the total revenue that must be generated
for the stormwater system by the total number of ERUs within the utility district.
3. Corrections, Adjustments, Credits, and
Exemptions
The Village recognizes that certain properties may have less impact on stormwater utility
costs than others in a similar rate class, primarily because of structural and non-structural
stormwater management practices property owners have implemented on- site.
Modifications to stormwater utility fees will be considered through corrections or credits,
as described in this section.
A. Corrections
A customer may apply for a correction if the customer believes the impervious area
calculation used for the ERU designation on the subject property is incorrect. To be
eligible for a Correction, the customer must provide the Stormwater Utility with site-
specific information specified in Section 5.0.
6
B. Adjustments
An adjustment is defined as a modification to a customer’s stormwater utility fee to reflect
site specific runoff characteristics that are substantially different from those attributed to
the base billing unit. An adjustment may be applicable if a customer in the nonresidential
or multifamily residential classes believes a portion of the subject property has significant
surface area that is not being served by Village owned infrastructure. This means that all
or a portion of the customer’s property does not directly or indirectly discharge to any
natural or manmade stormwater conveyance, storage, or treatment facility owned or
maintained in any way by the Stormwater Utility. To be eligible for an adjustment, the
property owner cannot have any past due taxes, fines, charges, or assessments, and the
discharge from the property must not be in violation of any environmental code or federal,
state, or local surface water drainage requirements.
Adjustments shall be applied only to the capital and debt service and operation and
maintenance components of the stormwater utility fee and a maximum adjustment of 50
percent shall be applied. Properties qualifying for an adjustment are still responsible for
the base component. An adjustment can be applied if the applicant demonstrates the
property is regulated by a separate municipal Stormwater Discharge Permit (WPDES).
An adjustment need only be applied for once, but can be reviewed if the property is
redeveloped or re-graded.
An adjustment shall also be reviewed if lands become annexed to the Village whereby
portions of the property that are receiving a stormwater utility fee adjustment becomes
served by Village infrastructure. This may result in a change to the adjustment for the
affected property.
C. Credits
1.0 Definition
A credit is defined as a percentage reduction applied to the operation and
maintenance and capital and debt service components of a customer’s
stormwater utility fee based on existence of an approved on-site stormwater
management practice or facility that reduces the rate or volume of stormwater or
sediment discharge to facilities owned or maintained by the Stormwater Utility. A
credit may be applicable if a customer in the nonresidential or multifamily
residential classes has constructed a detention basin, infiltration basin, or similar
facility that reduces impacts of stormwater runoff from the customer’s property to
the Village’s stormwater management system. This credit policy does not apply
to single family residential or duplex parcels. To be eligible for credit, all practices
7
must comply with the design, operation, and maintenance requirements of all the
applicable ordinances and codes of the Village of Cottage Grove, State or
Federal Permitting, and this Manual. Application procedures and requirements for
these credits are outlined in Section 5. To be eligible for the maximum credit, the
applicant must demonstrate that the facility is sized and designed in accordance
with Wisconsin Department of Natural Resources Conservation Practice
Standards.
2.0 Fee Credit Criteria
a. Peak Flow Reduction Credit: This credit is based on the
reduction of post-development peak flow for the specified rain event
(see below). An applicant must demonstrate that runoff from the land
parcel is released at a lower rate than without storm water
management. To determine the amount of credit, the “post -site
development” peak flow with no management will be compared to
the “post -site development” peak flow with management. The
percentage change will then be multiplied by the number of ERUs
“served” by the stormwater management facility and divided by two
(2). All calculations shall use the 10-year, 24-hour, MSE 4 distribution
rainstorm of 4.09 inches and SCS curve number hydrology. To be
eligible for the maximum credit, the applicant must demonstrate that
the facility is sized and designed in accordance with Wisconsin
Department of Natural Resources Conservation Practice Standards.
For example, the owner of a 30- acre nonresidential property having
an impervious area of 9.332 acres (100 ERUs) applies for a credit
based on the presence of a detention basin that reduces the 10-year
peak flow rate from the site from 20 cfs to 16 cfs (20.0 percent peak
flow reduction). This peak flow reduction is then divided by two,
yielding a peak flow reduction percentage of 10.0 percent.
20 cfs - 16 cfs) = 4.0 cfs →(4.0 cfs ÷ 20.0 cfs) × 100% = 20.0%
20.0% ÷ 2 = 10.0%
The detention basin serves an on-site impervious area of 4.666
acres (50 ERUs) of the total 9.332 acres of impervious area (100
ERUs) present on the site. The owner would then be eligible for a
credit of 5.0 ERUs to the operation and maintenance and capital
and debt service components of the stormwater utility fee, based on
multiplying 10.0 percent times the number of ERUs “served” by the
facility (50 ERUs times 10.0 percent). The property owner would
8
still be responsible for the full number of ERUs for the base
component.
(4.666 acres x 43,560 square feet) ÷ (4,065 square feet/ERU) = 50.0
ERUs
50.0 ERUs × 10.0% = 5.0 ERUs
b. Stormwater Quality Credit: This credit may be granted for parcels
that provide a quantifiable stormwater quality benefit through
implementation of approved Best Management Practices (BMP) for
treatment of stormwater runoff to capture nonpoint source pollutants.
The percent reduction in pollutant loading realized by a stormwater
BMP correlates to the percent stormwater quality credit to be applied.
For instance, a wet detention pond constructed to the DNR technical
standard achieves by design an 80 percent reduction in TSS. This
pollutant reduction is then divided by tw o, yielding a stormwater
quality credit reduction percentage of 40.0 percent. The following
credits will be considered:
i. Provision of a permanent pool designed in conformance with
Wisconsin Department of Natural Resources Conservation
Practice Standard 1001 to capture sediment and other
pollutants. This practice will be eligible for up to a 40 percent
credit applied to the number of ERUs “served” by the facility.
ii. Infiltration Basins, Infiltration Strips, or bioretention systems
will be eligible for up to a 30 percent credit applied to the
number of ERUs “served” by the facility. To be eligible for the
maximum credit, the applicant must demonstrate that the
facility is sized and designed in accordance with Wisconsin
Department of Natural Resources Conservation Practice
Standards.
iii. Manufactured devices designed to remove sediment from
stormwater runoff (e.g. “Stormceptor,” “Vortechs ,”
“Downstream Defender,” etc.) will be eligible for up to a 25
percent credit applied to the number of ERUs “served” by the
facility. The maximum number of ERUs subject to credit will
be capped with consideration of the maximum capacity of
each unit, per manufacturer’s specifications. For example, if
the device specified is designed to serve a maximum area of
1 acre (43,560 square feet) of impervious area, the maximum
ERU credit allowable is 2.7 ERUs (43,560 square feet divided
by 4,065 square feet per ERU times 25 percent).
9
(1.0 acre x 43,560 square feet) ÷ (4,065 square feet/ERU) =
10.7 ERUs
10.7 ERUs × 25.0% = 2.7 ERUs
iv. Provision of measures to trap oil and grease using oil/water
separators, replaceable inlet inserts, or other approved
practices will be eligible for up to a 15 percent credit applied
to the number of ERUs “served” by the practice.
3.0 Maximum Credit
The maximum aggregate credit to the operation/maintenance and
capital/debt service components of the Storm Water Service Charge of any
individual property is 50 percent of its gross calculated ERUs after
adjustments, regardless of how many individual credi ts for which the
property qualifies. Developments must conform to all applicable ordinances
and standards of the Village of Cottage Grove to be credit eligible. In the
event the Village needs additional improvements to meet TSS or TMDL
permit requirements, credits may be considered for areas already receiving
an adjustment.
4.0 Application of Credits
The total credit applied to a site will be the sum of individual credits applied
for. For example, an applicant may be eligible for both a peak flow reduction
credit and a water quality credit for a wet detention basin that provides both
peak flow reduction and water quality benefits to the Village. Likewise, if
different portions of a site are served by different stormwater facilities, the
total amount of credit is additive up to the maximum credit specified below.
The following example summarizes the possible use of additive credits.
A 30-acre nonresidential property having a total impervious area of 9.332
acres (100 ERUs) is located near the crest of a hill within the Village Limits.
The westerly 2.333 acres of impervious area (25 ERUs) drains to a
detention basin without a wet pool located on the west side of the property
that reduces peak flow for the 10- year storm by 37.5 percent, and the
easterly 4.666 acres of impervious area (50 ERUs) drains to a detention
basin on the east side of the property having a permanent wet pool
designed in accordance with Wisconsin Department of Natural Resources
10
technical standards that reduces peak flow for the 10- year storm by 20
percent. Dividing the peak flow reduction ratios for the west and east
detention basin yields final peak reduction ratios of 18.8 and 10.0 percent,
respectively. The ERU credits for the west and east basin is 4.7 and 5.0
ERUs, respectively.
West Basin
(2.333 acres x 43,560 square feet) ÷ (4,065 square feet/ERU) = 25.0
ERUs
25.0 ERUs × 18.8% = 4.7 ERUs
East Basin
(4.666 acres x 43,560 square feet) ÷ (4,065 square feet/ERU) = 50.0
ERUs
50.0 ERUs × 10.0% = 5.0 ERUs
1.333 acres of impervious area (14.3 ERUs) drains from the site directly to a storm
sewer owned and maintained by the stormwater utility without being treated by a
stormwater measure and the remaining 1.0 acres of the site directly drains to a
Town owned drainage ditch outside the jurisdiction of the stormwater utility. The
following adjustments and credits would apply:
c. The site would be eligible for a 50 percent adjustment of (-5.4 ERU’s)
because 1.0 acres of impervious area does not drain to a stormwater
facility owned or maintained by the stormwater utility.
(1.0 acre x 43,560 square feet) ÷ (4,065 square feet/ERU) = 10.7
ERUs
10.7 ERUs × 50.0% = 5.4 ERUs
d. The site would be eligible for a peak flow reduction credit of 9.7 ERUs
(4.7 ERUs to the west pond plus 5.0 ERUs to the east pond).
e. The site would be eligible for a water quality credit of 20.0 ERUs
based on the presence of a wet pool serving 50 ERUs (40 percent
Credit).
11
(4.666 acres x 43,560 square feet) ÷ (4,065 square feet/ERU) = 50.0
ERUs
50.0 ERUs × 40.0% = 20.0 ERUs
Based on these individual adjustments and credits, the operation/maintenance and
capital/debt service components of the stormwater utility fee would be reduced by
a total of 35.1 ERUs. Of this reduction, 5.4 ERUs is considered an adjustment, and
29.7 ERUs is considered a credit. Since the number of credited ERUs (29.7) after
adjustments is less than 50 percent of the gross number of ERUs on the site after
adjustments (47.3), the entire credit applies.
A sample worksheet depicting this calculation is included as Attachment 1.
D. Exemptions
Properties that are exempt from property taxes are not exempt from the stormwater utility
fee. Public right -of-way and railroad right -of-way is considered part of the Village’s
stormwater conveyance system and is therefore exempt. No other exemptions from
stormwater utility fees will be considered.
E. Right of Access
Prior to receiving a credit or exemption, the Director or designee shall be allowed access
to the property to determine the amount of credit or exemption to be granted. No credit
shall be considered for any “natural” features, including but not limited to, wetlands,
streams and creeks, floodplains, or water impoundment o f any kind in existence prior to
the passage of the stormwater utility ordinance.
F. Appeals
If the applicant believes special circumstances exist for their property that warrants
greater credits or adjustments than outlined in this policy they may submit an application
to be considered on a case by case basis as outlined in Cottage Grove Ordinance Chapter
312-105.
12
4. Application Procedures and Requirements
The Stormwater Utility will accept applications from property owners requesting
consideration for corrections, adjustments and credits. Applications may be obtained from
the Public Works and Utilities Director. A correction, adjustment or credit application will
not be considered complete and will not be processed unless accompanied by the
application fee and all appropriate forms and information as required in this manual. It is
the intent of the Stormwater Utility to process applications within thirty (30) calendar days
of submittal of the complete and correct application package. Billing adjustments required
to implement credits shall be applied to the following year’s rate following the customer’s
submittal of a complete application except for during 2027 where the adjustment will be
retroactive. Adjustments shall be made by crediting the customer’s storm water service
charge until any overpayment has been fully repaid. A pending application for credit shall
not constitute a valid reason for non- payment of the current Storm Water Utility Fees. In
the case of new development, Storm Water Utility F ees and the associated credits
detailed herein do not apply until construction is complete and verified by the Stormwater
Utility.
Upon receipt of the application, the Village will check application forms for completeness
and accuracy. If the application is found to be complete, accurate, and eligible for credit,
a letter will be sent to the applicant notifying approval of the credit. If deficiencies are
found during the review, a deficiency letter will be sent to the applicant’s contact person.
Upon receipt of additional information from the applicant, the review will resume and be
completed within thirty (30) calendar days of receipt of the additional information. If an
application is denied, a letter explaining the reasons for the denial will be provided to the
applicant. The applicant has the right to appeal this decision, in accordance with the
procedures outlined in the Village of Cottage Grove Stormwater Utility Ordinance.
Submittal requirements for Correction, Adjustment and Credit Applications are described
below.
A. Correction Applications
The completed Stormwater Utility Correction application must include a $100.00
application fee and plat of survey certified by a Wisconsin- Registered Land Surveyor, or
as-built construction site plan certified by a Wisconsin Professional Engineer or
Professional Hydrologist, indicating the following:
1. Property location.
2. Layout of impervious surface areas on the property.
13
3. A calculation or impervious area (in square feet) for each delineated
drainage area on the property.
The $100 application will be refunded to the property owner if the correction is found to
be warranted. The application fee may be adjusted by resolution of the Utility Commission
without amending this policy.
B. Adjustment Applications
The completed Stormwater Utility Fee Adjustment application must include a $200.00
application fee and plat of survey certified by a Wisconsin-Registered Land Surveyor, or
as-built construction site plan certified by a Wisconsin Professional Engineer or
Professional Hydrologist, indicating the following:
1. Property location.
2. Drainage basin divides on the property.
3. Layout of impervious surface areas on the property.
4. Layout of the drainage system on the property, including location and
elevations of natural and man-made features.
5. Sufficient topographic data or elevations to verify general drainage patterns
across the property.
6. A calculation of impervious area (in square feet) for each delineated
drainage area on the property.
The $200 application will be refunded to the property owner if the adjustment is found to
be warranted. The application fee may be adjusted by resolution of the Utility Commission
without amending this policy.
C. Credit Applications
The completed Peak Flow Control and Water Quality Credit application must include a
$200.00 application fee (The application fee may be adjusted by resolution of the Utility
Commission without amending this policy) and the following information:
1. Credit Policy Startup: The Village requires non- residential properties
seeking a stormwater utility credit to submit an annual application, along
with all supporting documentation, certified by a Wisconsin Professional
Engineer, by October 1 each year. No non -residential credits would be
granted during the first year of the program. However, beginning in 2028,
eligible credits may be applied retroactively to January 1, 2027, provided
the property owner submitted a complete credit application by the October
1, 2027 deadline and the qualifying stormwater management facility was in
operation for the entirety of 2027.
14
2. Maintenance information: Any agreements or contracts for inspection
and/or maintenance are required to be disclosed as part of the application.
Indicate the schedule for major maintenance that will be performed and how
many times per year basic maintenance (such as erosion control and/or
mowing) activities are performed. In order to maintain the credit, the
property owners shall provide the Village with inspection reports by October
1st of every subsequent year certified by a Wisconsin Professional Engineer
that the BMP is operating as intended . If a property owner fails to file
required inspection reports or if a Village inspection finds the s ystem not
meeting the conditions set forth, the Village will send a letter informing the
property owner of the required action to avoid revocation of the credits. If
the property owner fails to take the required action, the credits will be
revoked until the situation is corrected. No retroactive credits will be given
during the lapse period. Credits will be restored on the effective date of the
submittal of the property owner’s acceptable response.
3. Technical information (certified by a Wisconsin Professional Engineer):
a. Site plan(s) at a scale of 1”=100’ or larger (i.e. 1”=50’ or 1”=20’ etc.)
appropriate to display the following information clearly:
i. Locations, dimensions, and characteristics of all drainage
patterns and storm water management facilities.
ii. Location of all impervious surfaces including, but not limited
to: structures, parking, and driveways.
iii. Soils.
iv. Site topography.
v. Details of detention facility outlet structure(s).
vi. Diagram of watershed routing to the detention facility(s).
vii. As built construction drawings verifying the storm water
management structural information.
b. Summary of runoff peak flow calculations for the 10- year, 24-hour
rain event, by watershed, including the following:
i. Existing flow rates.
ii. Postdevelopment flow rates without management.
Postdevelopment flow rates with management.
c. Calculations (and factors used for calculations) performed to
determine existing, postdeveloped "managed", and postdeveloped
"unmanaged" peak flow control including, but not limited to the
following:
15
i. Time of concentration(s).
ii. Curve number(s).
iii. Watershed areas.
iv. Watershed routing.
v. Engineered designs for all structural flow control
management practices. Stage-storage-discharge tables or
curves for the detention facility(ies).
vi. Tailwater impacts, if any.
4. Statement of Certification: The owner shall sign a statement certifying that
information is correct and acknowledging that the credit determination will
be based on information provided. A later determination that the application
information was inaccurate may result in loss of credit. NOTE: Property
owners are encouraged to apply for flow control credits on new
developments as part of the Village’s normal development plan review
procedures. The credits, as well as the Storm Water Service Charges, do
not go into effect until the construction is complete or upon granting of
conditional occupancy. Credits will not be in effect until as -built data have
been submitted for new storm water management facilities.
01-01-2027
STORM WATER UTILITY
CREDIT REQUEST APPLICATION FORM
All completed application forms, application fee (where applicable) and supporting documentation shall be submitted to:
Village of Cottage Grove, Attention: Public Works and Utilities Director
221 East Cottage Grove Road, Cottage Grove, WI 53527
Property Owner Information
Name: ______________________________________________________________________________________
Property Address: _____________________________________________________________________________
Utility Billing Address: ________________________________________________________________________
E-mail: ________________________________________ Phone: ___________________________________
Property Information
Parcel No. Utility Account No.
Credit Requested (check all that apply):
Credit for Peak Flow Reduction Credit for Water Quality
(Refer to the Stormwater Credit Policy Manual for required supporting documentation)
Submittal Description (Provide complete description of proposed credit(s) requested, attach additional pages as
necessary)
I certify that the attached information is accurate to the best of my knowledge and that I have the authority to make such a
request for this property. I agree to provide the Village of Cottage Grove with corrected information should there be any changes
made to the information provided herein. I further authorize the Village of Cottage Grove to access the property identified for
credit in this application.
Signature: Name:
(Printed)
Date:
VILLAGE OF COTTAGE GROVE USE (Do not write in shaded area)
Credit Submitted (Check all that apply) Approved Credit
(Yes or No) (%)
□ Credit for Peak Flow Reduction _____________ _____________
□ Credit for Water Quality _____________ _____________
Date Written Notification Letter Sent to Applicant: ______________
Date Adjustment Submitted to Billing: ________________________
Approved By: ___________________________ Signature: _______________________
Title: __________________________________ Date: ___________________________
COTTAGE GROVE SEWER UTILITY
Replacement Fund
Estimated
Lifespan
2027
Replacement
Cost
Annual
Contribution
Previous
Expenditure
Year
Anticipated
Expenditure
Year
Sewer Equipment
Vactor Truck 20 545,000.00$ 27,250.00$ 2024 2044
Portable Pump - Godwin Trash Pump 20 75,000.00$ 3,750.00$ 2009 2030
110 S. Main Lift Station
Pump and Motor Replacement - Pump 1 20 25,000.00$ 1,250.00$ 2018 2038
Pump and Motor Replacement - Pump 2 20 25,000.00$ 1,250.00$ 2018 2038
Pump and Motor Replacement - Pump 3 20 25,000.00$ 1,250.00$ 2018 2038
Impeller Replacement - Pump 1 6 10,000.00$ 1,666.67$ 2023 2029
Impeller Replacement - Pump 2 6 10,000.00$ 1,666.67$ 2023 2029
Impeller Replacement - Pump 3 6 10,000.00$ 1,666.67$ 2023 2029
VFD Replacement - Pump 1 15 25,000.00$ 1,666.67$ 2018 2033
VFD Replacement - Pump 2 15 25,000.00$ 1,666.67$ 2018 2033
VFD Replacement - Pump 3 15 25,000.00$ 1,666.67$ 2018 2033
Mag Meter 20 20,000.00$ 1,000.00$ 2018 2038
Grinder Replacement - Muffin Monster 10 30,000.00$ 3,000.00$ 2018 2028
Generator 30 75,000.00$ 2,500.00$ 2000 2030
Vilas Rd. Lift Station
Pump Rehabilitation - Pump 1 20 20,000.00$ 1,000.00$ 2008 2028
Pump Rehabilitation - Pump 2 20 20,000.00$ 1,000.00$ 2008 2028
Pump Rehabilitation - Pump 3 20 20,000.00$ 1,000.00$ 2008 2030
Pump Rehabilitation - Pump 4 20 20,000.00$ 1,000.00$ 2008 2030
Pump Replacement - Pump 1 40 70,000.00$ 1,750.00$ 2008 2048
Pump Replacement - Pump 2 40 70,000.00$ 1,750.00$ 2008 2048
Pump Replacement - Pump 3 40 70,000.00$ 1,750.00$ 2008 2050
Pump Replacement - Pump 4 40 70,000.00$ 1,750.00$ 2008 2050
Motor Replacement - Pump 1 20 50,000.00$ 2,500.00$ 2008 2028
Motor Replacement - Pump 2 20 50,000.00$ 2,500.00$ 2008 2028
Motor Replacement - Pump 3 20 50,000.00$ 2,500.00$ 2008 2028
Motor Replacement - Pump 4 20 50,000.00$ 2,500.00$ 2008 2028
VFD Replacement - Pump 1 20 25,000.00$ 1,250.00$ 2008 2029
VFD Replacement - Pump 2 20 25,000.00$ 1,250.00$ 2008 2029
VFD Replacement - Pump 3 20 25,000.00$ 1,250.00$ 2008 2029
VFD Replacement - Pump 4 15 25,000.00$ 1,666.67$ 2008 2029
Mag Meter 20 20,000.00$ 1,000.00$ 2008 2028
Generator 30 125,000.00$ 4,166.67$ 2008 2038
Trillium Lift Station
Pump and Motor Replacement - Pump 1 20 25,000.00$ 1,250.00$ 1990 2026*
Pump and Motor Replacement - Pump 2 20 25,000.00$ 1,250.00$ 1991 2026*
Impeller Replacement - Pump 1 6 10,000.00$ 1,666.67$ 2000 2028
Impeller Replacement - Pump 2 6 10,000.00$ 1,666.67$ 2000 2028
*Planned replacements are currently deferred and original replacement was scheduled for 2023.
Business Park Lift Station
Pump and Motor Replacement - Pump 1 20 25,000.00$ 1,250.00$ 2003 2027
Pump and Motor Replacement - Pump 2 20 25,000.00$ 1,250.00$ 2003 2029
Add Pump and Motor 3 10 25,000.00$ 2,500.00$ 2038
Impeller Replacement - Pump 1 6 10,000.00$ 1,666.67$ 2023 2029
Impeller Replacement - Pump 2 6 10,000.00$ 1,666.67$ 2023 2029
Generator 30 75,000.00$ 2,500.00$ 2003 2033
Shady Grove Lift Station
Pump and Motor Replacement - Pump 1
Pump and Motor Replacement - Pump 2 20 25,000.00$ 1,250.00$ 2022 2042
Impeller Replacement - Pump 1 6 10,000.00$ 1,666.67$ 2022 2028
Impeller Replacement - Pump 2 6 10,000.00$ 1,666.67$ 2022 2028
VFD Replacement - Pump 1 15 25,000.00$ 1,666.67$ 2022 2037
VFD Replacement - Pump 2 15 25,000.00$ 1,666.67$ 2022 2037
Generator 30 75,000.00$ 2,500.00$ 2022 2052
Westlawn Lift Station
Pump and Motor Replacement - Pump 1 20 25,000.00$ 1,250.00$ 2025 2045
Pump and Motor Replacement - Pump 2 20 25,000.00$ 1,250.00$ 2025 2045
Impeller Replacement - Pump 1 6 10,000.00$ 1,666.67$ 2025 2031
Impeller Replacement - Pump 2 6 10,000.00$ 1,666.67$ 2025 2031
VFD Replacement - Pump 1 15 25,000.00$ 1,666.67$ 2025 2040
VFD Replacement - Pump 2 15 25,000.00$ 1,666.67$ 2025 2040
Generator 30 75,000.00$ 2,500.00$ 2025 2055
SCADA Controls/Electronics
Lift Station sites (6; rotating) 5 10,000.00$ 2,000.00$ 2025 2030
123,583.33$ per yr contribution
Director Report
Discolored Water Concerns from Residents
Utility staff have continued to be proactive in responding to discolored water concerns from
residents. As previously communicated, current discoloration at time of contacting the Utility has
been isolated incidents, including a main break, service being located at a dead end, and a condo
building testing their fire suppression system. Timely reporting allows staff to investigate
conditions more effectively and respond to concerns as accurately as possible. Weekly updates
are being provided to the Utility Commission and Village Board and can be found on the
Village’s website.
Fall Hydrant Flushing
Staff began the fall fire hydrant flushing at the end of September and completed the fall flushing
at the end of October. Staff are focusing on dead-end locations and areas with lower usage as it
relates to the location of the main.
Frontier Communication – Village-Wide Project
Frontier Communications has submitted various right-of-way permits to complete a fiber internet
installation within the Village. Their design incorporates both underground an overhead facilities
thought the Village limits. Due to the resources needed for utility locates for this Village-wide
project, Frontier and their team has agreed to reimburse the Village for using a 3
rd party company
to complete the village public infrastructure locates on our behalf. GLS will be completing these
locates on behalf of the Village and Frontier began in June.
Sanitary Sewer Televising
The remaining sanitary sewer easement locations were televised mid-October. This provided
televising records of all locations that are known to be clay or concrete pipe to help plan for the
2028 Sewer Lining Project.
Security Grant Update
Staff completed the grant application for submission by October 30
th. The Commission will be
updated in December on award status and potential next steps.
Water Education
As directed by the Village Board at the September 21
st meeting, I am reaching out to a variety of
Utility Commission
Director and Engineering Monthly Report –
November 11, 2026
Kyela O’Loughlin P.E., Public Works and Utilities Director
different sources, including engineers, DNR, and Rural Water, to inquire about doing a
presentation or providing additional information about our aquifer and water quality in Dane
County. I am currently in talks with the Wisconsin Geological and Natural History Survey
Department from UW-Madison to determine a presentation time.
Water Main Break – Dentaria Drive
On October 18
th, there was a water main break near an existing break. That Sunday afternoon,
staff secured a local contractor who has assisted the Water Utility in the past to complete the
repair. Water service to the affected block was temporarily interrupted from approximately 2:00
p.m. to 4:00 p.m. while crews completed the necessary work. This section of water main did not
have a break in 2024, had one break in 2025, and now it is two breaks in 2026. After the earlier
break in 2026, it was recommended to include this water main to be replaced as part of the 2028
Streets project.
Engineering Report
HeyDay Cottage Grove
All public utilities have been installed since the end of 2025. A final walk through and punch list
was completed mid-October for the utilities within the development in easements and the
contractor is working on the punch list items.
Juniper Fields Development
The developer is working to finalize the remaining items needed prior to mass grading efforts for
the first phase of the project, which is anticipated to begin in early November, followed by utility
installation.
Well No. 2 Rehabilitation
Well No. 2 is officially offline. The well rehabilitation portion began the week of August 3
rd with
the removal of the well head for rehab and maintenance. Findorff and their team mobilized the
week of August 24th and the Well building was demolished the week of September 7th. Attached
is an Executive Summary for the project through the end of October provided by Findorff.
Paving the Donna Street patch is scheduled for mid-November and then the contractor will
demobilize until spring.
Gaston Road – CTH TT Water Main Looping
The project is substantially completed, and all punch list items have been addressed. The final
pay application with the remaining retainage was paid in October.
2027 Construction Projects – S. Main Street and Ollie Street Reconstruction
Strand has started preliminary design for both the reconstruction projects for next year. A Public
Information Meeting was held for both projects on November 5th. Probe Technologies is
tentatively scheduled for early December to complete the geoprobe additional soil investigation
as discussed in October.
EXECUTIVE SUMMARY
Well #2 Replacement
PROVIDED BY FINDORFF
Concrete foundation wall pour.
10.28.2026
Building Foundation, CMU Walls and Electrical
The new building foundation has come together quickly.
Crews are onsite focusing on sequencing and safety for the
project. We have successfully completed the foundation
walls and finished interior slab.
Our plumbing and electrical crews have been working on
underground utility feeds for the new devices and
equipment within the building.
Next steps: building / finish CMU walls around the new
building and patch the roadway pavement for Donna Street
by the middle of November. Once completed we will be
underway with demobilization and site security for the
winter months until starting Phase 2 in April of 2027.
////////////////////////////205 Donna Street• Cottage Grove, WI ////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
Questions?
Project Manager: Joe Clough / 608-316-9417 /
Interior CMU wall construction underway.
Plumbing and Electrical utilities located underneath the finished interior
slab.
Water covers about 71% of the Earths Surface and approximately 97% of that is made up of Salt Water
Oceans. Fresh water makes up only about 3% of the planets total water supply. Of freshwater
sources, less than 1% makes up water found in streams, rivers, lakes and the atmosphere.
Water dissolves more substances than any other liquid.
Source: Village of Cottage Grove website. First collected Nov 8, 2026.