Board of Public Works & Capital Assets Regular Meeting Agenda (PDF)
City of Oak Creek · Milwaukee County · meeting of Nov 10, 2026 · Agendas
Open the original document More from City of Oak Creek
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
BOARD OF PUBLIC WORKS AND CAPITAL ASSETS
November 10, 2026
9:00 A.M.
Common Council Chambers
8040 S. 6th Street
Oak Creek, WI 53154
(414) 766-7000
Robert Cigale
Curtis Czarnecki
Kenneth Gehl
Chris Guzikowski
Lisa Marshall
Fredrick Siepert- Alternate
aNDREW
The City’s Vision
Oak Creek: A dynamic regional leader driving the future of the south shore.
1. Call Meeting to Order.
2. Roll Call.
3. Approval of Minutes – 10/13/2026
4. Informational: Review of Common Council actions related to Public Works & Capital Assets.
GENERAL GOVERNMENT CAPITAL ASSETS
5. Motion: Consider a motion to recommend road improvement projects to be advertised for public
bid for construction in 2027 to the Common Council for approval.
PUBLIC WORKS & UTILITIES
6. Motion: Consider a motion to approve the Utility water and sewer capital improvement budgets
for 2027.
7. Motion: Consider a motion to approve the Utility vouchers in the amount of $582,095.07.
8. Informational: Administrative and Operations reports.
TRAFFIC & SAFETY
N/A
Adjournment.
Dated on this 5th day of November 2026.
1
Public Notice
Upon reasonable notice, a good faith effort will be made to accommodate the needs of disabled individuals through sign language interpreters or
other auxiliary aid at no cost to the individual to participate in public meetings. Due to the difficulty in finding interpreters, requests should be made
as far in advance as possible, preferably a minimum of 48 hours. For additional information or to request this service, contact the Oak Creek City
Clerk at 414-766-7000, by fax at 414-766-7976, or by writing to 8040 S. 6 th Street, Oak Creek, Wisconsin 53154.
It is possible that members of and possibly a quorum of members of other governmental bodies of the municipality may attend the above-stated
meeting to gather information; no action will be taken by any governmental body at the above-stated meeting other than the governmental body
specifically referred to above in this notice.
2
BOARD OF PUBLIC WORKS AND CAPITAL ASSETS
October 13, 2026
9:00 A.M.
Common Council Conference Room
8040 S. 6th Street
Oak Creek, WI 53154
(414) 766-7000
Robert Cigale
Curtis Czarnecki
Kenneth Gehl
Chris Guzikowski
Lisa Marshall
Fredrick Siepert- Alternate
aNDREW
The City’s Vision
Oak Creek: A dynamic regional leader driving the future of the south shore.
1. Call Meeting to Order.
Alderman Chris Guzikowski called the meeting to order at 9:00 AM.
2. Roll Call.
All Board Members were present.
Also present: Director of Utilities Brian Johnston, Assistant City Administrator/Engineer Matthew
Sullivan, Deputy City Administrator/Finance Officer Max Gagin, Finance and Accounting Manager
Kristina Strmsek, Interim Public Works Director Kevin Archambeau, City Attorney Melissa Karls,
Assistant Administrative Services Director Carrie Wittlieff, Accounts Payable Clerk Nicole Butler,
and Administrative Service Assistant Zach Solomon.
3. Approval of Minutes – 09/08/2026
Alderperson Gehl made a motion to approve the minutes of September 8, 2026, seconded by
Board Member Cigale. Roll call vote: All aye. Motion carried.
4. Informational: Review of Common Council actions related to Public Works & Capital Assets.
Deputy City Administrator/Finance Officer Gagin reported that Common Council approved the bid
award for the Abendschein Beer Garden project in an amount slightly over $1.5 million. The bid
amount was slightly over the project budget but generally consistent with anticipated costs.
GENERAL GOVERNMENT CAPITAL ASSETS
N/A
PUBLIC WORKS & UTILITIES
5. Motion: Consider a motion to approve the purchase of a Salt Dogg Portable Anti-Ice complete
system sprayer at a cost of $22,113.68.
Interim Public Works Director Archambeau explained that the additional portable anti-ice sprayer
will improve pretreatment capacity, provide equipment backup, and support salt-use reduction.
3
Alderperson Marshall made a motion to approve the purchase of a Salt Dogg Portable Anti-Ice
complete system sprayer at a cost of $22,113.68, seconded by Board Member Cigale. Roll call
vote: All aye. Motion carried.
6. Motion: Consider a motion to approve change order No. 1 in the amount of $2,121.00 to CD
Smith Construction, Inc. for the removal of a tree. (Project No. 22118) (4 th Aldermanic District)
Director of Utilities Johnston reported that removal of the tree is necessary to provide construction
access for the Underground Facilities Rehabilitation Project.
Alderperson Marshall made a motion to approve Change Order No. 1 in the amount of $2,121.00
to CD Smith Construction, Inc. for the removal of a tree, seconded by Board Member Cigale. Roll
call vote: All aye. Motion carried.
7. Motion: Consider a motion to authorize the Utility Engineer to enter into a professional service
agreement with raSmith based on a cost to not exceed $30,420.00 for the design of the Ryan
Road & Howell Avenue Water Main Abandonment and to amend the 2026 Capital Improvement
Budget by $30,420.00. (3rd Aldermanic District)
Director of Utilities Johnston explained that the design work is needed to coordinate water-main
abandonment and related improvements before the planned Wisconsin Department of
Transportation roadway project.
Alderperson Gehl made a motion to authorize the Utility Engineer to enter into a professional
service agreement with raSmith based on a cost to not exceed $30,420.00 for the design of the
Ryan Road & Howell Avenue Water Main Abandonment and to amend the 2026 Capital
Improvement Budget by $30,420.00, seconded by Board Member Siepert. Roll call vote: All aye.
Motion carried.
8. Motion: Consider a motion to approve the Utility vouchers in the amount of $2,258,538.49.
Director of Utilities Johnston noted that the vouchers included a substantial payment associated
with the Underground Facilities Rehabilitation Project.
Alderperson Marshall made a motion to approve the Utility vouchers in the amount of
$2,258,538.49, seconded by Board Member Cigale. Roll call vote: All aye. Motion carried.
9. Motion: Consider a motion to approve the 2027 Operating Budget for the Oak Creek Water and
Sewer Utility.
Director Johnston and Deputy City Administrator/Finance Officer Gagin presented the proposed
2027 Operating Budget for the Oak Creek Water and Sewer Utility. The Board discussed staffing
needs, capital-project impacts, and future rate considerations.
Alderperson Gehl made a motion to approve the 2027 Operating Budget for the Oak Creek Water
and Sewer Utility, seconded by Board Member Czarnecki. Roll call vote: All aye. Motion carried.
4
10. Informational: Administrative and Operations reports.
Director Johnston provided an update on the Underground Facilities Rehabilitation Project,
including project mobilization, pile-driving preparation, water-quality monitoring, and contingency
planning. He also reported that new Chemtrac water-quality monitoring equipment had been
installed at the Water Treatment Plant and was being integrated into the SCADA system.
TRAFFIC & SAFETY
N/A
Adjournment.
Alderperson Marshall made a motion to adjourn, seconded by Board Member Czarnecki. Roll call vote: All
aye. Motion carried.
Dated on this 15th day of September 2026.
Public Notice
Upon reasonable notice, a good faith effort will be made to accommodate the needs of disabled
individuals through sign language interpreters or other auxiliary aid at no cost to the individual to
participate in public meetings. Due to the difficulty in finding interpreters, requests should be made as far
in advance as possible, preferably a minimum of 48 hours. For additional information or to request this
service, contact the Oak Creek City Clerk at 414-766-7000, by fax at 414-766-7976, or by writing to 8040
S. 6th Street, Oak Creek, Wisconsin 53154.
It is possible that members of and possibly a quorum of members of other governmental bodies of the
municipality may attend the above-stated meeting to gather information; no action will be taken by any
governmental body at the above-stated meeting other than the governmental body specifically referred to
above in this notice.
5
Bid Structure Street Name From To District Length (ft)
Width (FT)Edge of
Pavement to Edge of
Pavement
Functional
Classification
Existing
Pavement
Type
2025 Paser
Rating Proposed Improvement Cost
E. Pendragon Ct. W. Termini S. Delaine Dr. 1 370 24 Local Asphalt 3 Reconstruct $216,000
E. Excalibur Ct. S. Delaine Dr. E. Termini 1 422 24 Local Asphalt 3 Reconstruct $235,500
E. Jennifer Ln./E. Jennifer CT. S. Cindy Ln. S. Jennifer Ln. 5 317 28 Local Concrete 4 3" HMA Overlay; Base Patching $113,000
S. Jennifer Ln. E. Jennifer Ln. E. Cindy Ln. 5 581 28 Local Concrete 5 3" HMA Overlay; Base Patching $336,000
E. Stone Gate Dr. S. Shepard Ave. E. Termini 3 1435 24 Local Asphalt 4 Mill and Overlay, Base Patching $145,500
Elizabeth Dr. E. Melody Dr. E. Stonegate Dr. 3 350 24 Local Asphalt 5 Mill and Overlay, Base Patching $46,000
Lizanne Dr. E. Melody Dr. E. Stonegate Dr. 3 580 24 Local Asphalt 5 Mill and Overlay, Base Patching $67,000
E. Melody Dr. Elizabeth Dr. Lizanne Dr. 3 415 24 Local Asphalt 5 Mill and Overlay, Base Patching $52,000
S. Lenox Ave E. Montana Ave. E. Marquette Ave 1 317 24 Local Asphalt 4 2.5" Mill and Overlay $160,000
S. Logan Ave E. Marquette Ave. E. Milwaukee Ave. 1 687 28 Local Concrete 3,4 3" HMA Overlay, Concrete Base Patching $461,500
E. Milwaukee Ave. S. Lenox Ave. S. Logan Ave. 1 423 28 Local Concrete 4 3" HMA Overlay, Concrete Base Patching $277,500
E. Elm Rd S. Shepard Ave. S. McGraw Dr 5 1479 48 Collector Concrete 4 3" HMA Overlay, Concrete Base Patching $1,288,500
Judith Place W. Oakwood Rd Northern Termini 5 Local Asphalt 4 Real Estate Acquisition $115,000
6th St W. Drexel Ave. W. Marquette Ave. 1 2157 48 Collector Asphalt 5 Resurfacing $446,500
S. Ash Street E. Chestnut Dr. S. Juniper Dr. 1 1056 28 Local Concrete 5 3" HMA Overlay or Reconstruct $601,000
Drexel Railroad Crossing 150' W. of Crossing 150' E. of Crossing 1 300 48 Arterial Concrete 7 Pavement Repairs $140,000
$4,701,000
Alternate 1 S. Delaine Dr. S. Crane Dr. N. Termini 1 1800 24 Local Asphalt 4 Reconstruct $1,030,000
Alternate 2 E. Elm Rd S. Mcgraw Dr S. Nicholson Rd 5 1214 48 Local Concrete 5 3" HMA Overlay, Concrete Base Patching $1,077,000
Alternate 3 Ryan Road ( Old Ryan) RR Crossing Approx. 150' W. of Crossing Approx. 150' E. of Crossing 3, 4 300 24 Local Asphalt 4 Profile Mill and Overlay $65,000
Alternate 4 2100 E. Elm Road RR Crossing Approx. 150' W. of Crossing Approx. 150' E. of Crossing 5 300 24 Collector Asphalt 5 Profile Mill and Overlay $65,000
Alternate 5 E. Milwaukee Ave. S. Logan Ave S. Clement Ave 1 360 28 Local Concrete 5 3" HMA Overlay; Base Patching $248,000
2027 Road Improvement Recommendations
Base Bid Total
Base Bid
8
9
10
11
12
13
14
Water Sewer Total Source for estimate
Operating Activities:
Operating income (loss) per budget 2,365,768$ (94,200)$ 2,271,568$ Operating Budget
Adjustments to reconcile operating income
to net cash provided by operating activities:
Depreciation per budget 3,063,400 687,100 3,750,500 Operating Budget
Net Cash Provided By Operating Activities: 5,429,168 592,900 6,022,068
Capital and Related Financing Activities:
Acquisition and construction of capital assets - CO (27,920,660) (498,159) (28,418,819) Capital Budget
Acquisition and construction of capital assets - New (4,206,500) (1,753,000) (5,959,500) Capital Budget
Special assessment proceeds 31,000 1,500 32,500 Updated to be closer to Tax Roll
Interfund loan payment - principal (298,095) 298,095 - Interfund loan schedule
Interfund loan payment - interest (23,000) 23,000 - Interfund loan schedule
Debt payment - principal (1,237,805) - (1,237,805) Debt Schedule
Debt payment - interest (228,700) - (228,700) Debt Schedule
Net Cash Provided By Capital and Related
Financing Activities (33,883,761) (1,928,563) (35,812,324)
Investing Activities:
Interest received 1,391,000 361,900 1,752,900 Est on 2024 through September
Net Cash Provided By Investing Activities 1,391,000 361,900 1,752,900
NET CHANGE IN CASH (27,063,593)$ (973,763)$ (28,037,356)$
Unrestricted Cash - Beginning of Year:
Cash Balance as of 9/30/2026:
Checking 4,915,038 3,720,485 8,635,523$
LGIP 32,637,890 6,308,114 38,946,004
Less: Restricted cash (1,652,954) (1,652,954)
Less: CMAR sewer equip replacement account (1,235,366) (1,235,366)
Less: Dec. 1, 2026 debt payment due (463,055) (463,055)
Less: Dec. 15, 2026 interfund loan payment due (331,978) 331,978 -
Less: Pollution at treatment plant site (350,000) - (350,000) Cash still needs to be paid out for this
Unrestricted Cash - Beginning of Year 34,754,941 9,125,212 43,880,153
Unrestricted Cash - End of Year 7,691,348 8,151,449 15,842,797
Less: Reserve balance to maintain (5,056,216) (2,995,850) (8,052,066) Operating Budget
Unreserved Cash - End of Year 2,635,132$ 5,155,599$ 7,790,731$
OAK CREEK WATER AND SEWER UTILITY
Forecasted Statement of Cash Flows
For the Year Ending December 31, 2027
16
# Project Total Water Sewer
Distribution Replacement of Two Utility Vehicles 100,000.00 70,000.00 30,000.00
Meter Exchange Program 600,000.00 600,000.00
Replacement of 1985 Skid Loader 100,000.00 75,000.00 25,000.00
Hydrant Refinishing 35,000.00 35,000.00
Excavaton Safety 30,000.00 21,000.00 9,000.00
HQ Building Repairs 150,000.00 105,000.00 45,000.00
Water Storage Structure Maintenance 40,000.00 40,000.00
Subtotal 1,055,000.00$ 946,000.00$ 109,000.00$
Treatment Plant Replace Hot Water Supply Pumps 22,500.00 22,500.00
Lowlift VFD Drives 39,000.00 39,000.00
Orchard Way High Zone Pump Isolation Valves 60,000.00 60,000.00
Painting Backwash Tower 70,000.00 70,000.00
Subtotal 191,500.00$ 191,500.00$ -$
Projects Replacement of Trimble GPS 38,000.00 19,000.00 19,000.00
Security Improvements 250,000.00 190,000.00 60,000.00
Remote Station PLC Improvements 250,000.00 190,000.00 60,000.00
Remote Station Radio Replacements 75,000.00 50,000.00 25,000.00
Oak Lane Water Main Looping 200,000.00 200,000.00
Ryan and Howell Water Lateral Replacement and Main Abandonment 325,000.00 325,000.00
13th Street Oakwood - Puetz Hydrant Relocation and Manhole Adjusting 150,000.00 120,000.00 30,000.00
Chicago Road County Line to Forest Hill Water Relay 2,000,000.00 1,500,000.00 500,000.00
Wake Forest Court and Wake Forest Drive Water Main Relay - Design 50,000.00 50,000.00
S. Howell Avenue Roadway Patches 150,000.00 150,000.00
Water Quality Monitors 150,000.00 150,000.00
DIP Condition Assessment 125,000.00 125,000.00
MMSD MIS Drop Manhole 450,000.00 450,000.00
27th Street Sanitary Sewer 500,000.00 500,000.00
Subtotal 4,713,000.00$ 3,069,000.00$ 1,644,000.00$
TOTAL 5,959,500.00$ 4,206,500.00$ 1,753,000.00$
Year Total Water Sewer
2026 5,812,900.00 5,138,650.00 674,250.00
2025 3,395,144.00 2,511,600.00 883,544.00
2024 12,377,000.00 11,298,500.00 1,078,500.00
2023 8,443,658.50 7,338,604.85 1,105,053.65
2022 3,713,500.00 2,908,100.00 805,400.00
WATER & SEWER UTILITY
2027 CAPITAL BUDGET
Five Year History
17
AMOUNT
TOTAL REMAINING
PROJECT DESCRIPTION BUDGETED AS OF 10/31/2026 WATER SEWER
22118 Underground Facilities Rehabilitation (2016, 2017, 2018, 2020, 2022, 2023, 2024, 2026) 30,000,000.00 26,192,853.60 26,192,853.60 -
23109 HVAC Replacement WTP (2023, 2024, 2025) 1,200,000.00 172,349.83 172,349.83 -
25103 Root Ctrl Treatmnt - Lrg Diameter Pipes (2025, 2026) 80,000.00 61,977.00 - 61,977.00
25105 Hydrant Refinishing (2025, 2026) 50,000.00 12,505.00 12,505.00 -
25108 Filter Console Controller Replacements (2025) 50,000.00 4,419.77 4,419.77 -
25116 Lakeview Dr & Mona Ct Water Main Rplcmnt (2025) 700,000.00 150,741.47 150,741.47 -
26103 Meter Reading Fixed Network 100,000.00 41,590.00 31,192.50 10,397.50
26104 Meter Exchange Program 262,000.00 (28,939.66) (28,939.66) -
26108 Reline Chlorine Bulk Tanks 40,000.00 40,000.00 40,000.00 -
26111 Large Sump Pump Replacement 37,000.00 22,785.00 22,785.00 -
26113 E. Marquette Avenue Water Relay 1,000,000.00 952,882.58 952,882.58 -
26115 Sanitary System Map Upgrade 150,000.00 125,803.92 - 125,803.92
26116 Various Dead End Hydrant Installations 250,000.00 219,870.36 219,870.36 -
26117 Water Quality Monitors 150,000.00 150,000.00 150,000.00 -
26118 Sanitary Sewer Rehabilitation 300,000.00 299,980.10 - 299,980.10
TOTAL PROJECTS IN PROGRESS BUDGET 34,369,000.00 28,418,818.97 27,920,660.45 498,158.52
2027 CAPITAL BUDGET
PROJECTS IN PROGRESS
18
2027 CAPITAL IMPROVEMENT/EQUIPMENT PROGRAM (CIP/CEP)
2027 City of Oak Creek Annual Budget
Department:
Water & Sewer Utility (Distribution)
Contact Person:
Darrin Allard
Request Title:
Replacement of two utility vehicles.
General Description:
Replace two vehicles that are used by distribution and the treatment plant.
Justification and Intent:
One vehicle is a 2014 model year that is used by the treatment plant for testing. The other one is a 2015 model
pickup used by distribution. We try to follow a 12-year replacement cycle on our fleet vehicles.
Description of Alternatives:
Let the vehicles keep getting older and in need of more repairs
Description of Disposal, if Applicable:
The vehicles will either be traded in or sold at auction.
Impact on other Projects:
None
Cost Analysis: (Quotes, estimates, breakdown of potential cost and how you arrived here)
Based on current market pricing, $100,000 should cover the purchase of two vehicles and the equipment
needed to use them in the field.
Annual Impact on Operating Budget: (Will we have an additional reoccurring operating cost?)
None
19
2027 CAPITAL IMPROVEMENT/EQUIPMENT PROGRAM (CIP/CEP)
2027 City of Oak Creek Annual Budget
Department:
Water & Sewer Utility (Distribution)
Contact Person:
Darrin Allard
Request Title:
Replacement water meters for our exchange program
General Description:
Water meters are replaced as scheduled
Justification and Intent:
We would like to get the Badger meters replaced with Neptune meters as soon as possible.
Description of Alternatives:
None per the PSC. Meters are required to be replaced on a 20-year cycle.
Description of Disposal, if Applicable:
Old meters are torn apart and scrapped
Impact on other Projects:
None
Cost Analysis: (Quotes, estimates, breakdown of potential cost and how you arrived here)
$600,000 for 1500-5/8 meters, 20-1” meters, 60-1.5” meters, 80-2” meters and meter end points
Annual Impact on Operating Budget: (Will we have an additional reoccurring operating cost?)
None
20
2027 CAPITAL IMPROVEMENT/EQUIPMENT PROGRAM (CIP/CEP)
2027 City of Oak Creek Annual Budget
Department:
Water & Sewer Utility (Distribution)
Contact Person:
Darrin Allard
Request Title:
Replacement of 1985 skid loader
General Description:
We would like to replace our skid steer with a more practical and useful compact loader. This will aide in yard
cleanup, restoration, and would be able to load our dump trucks.
Justification and Intent:
To replace the 1985 Case 185 skid steer that was purchased new. The skid steer is unable to load our small
dump truck safely and can’t reach to load our big dump truck. It is also unable to move our spoil piles. We also
need to trailer it everywhere we need to take it.
Description of Alternatives:
Keep utilizing the 40+ year old skid steer the best we can
Description of Disposal, if Applicable:
Tractor will be sold at auction
Impact on other Projects:
None
Cost Analysis: (Quotes, estimates, breakdown of potential cost and how you arrived here)
$100,000 with accessories.
Annual Impact on Operating Budget: (Will we have an additional reoccurring operating cost?)
None
21
22
23
2027 CAPITAL IMPROVEMENT/EQUIPMENT PROGRAM (CIP/CEP)
2027 City of Oak Creek Annual Budget
Department:
Water & Sewer Utility (Distribution)
Contact Person:
Darrin Allard
Request Title:
Hydrant refinishing
General Description:
Many hydrants on main roads are starting to rust from the amount of salt that they are exposed to. The best way
to refinish them is to sandblast, prime, and paint them.
Justification and Intent:
These typically need more work than we are equipped to do.
Description of Alternatives:
Keep putting paint on them to mask the rust and help prevent corrosion.
Description of Disposal, if Applicable:
N/A
Impact on other Projects:
None
Cost Analysis: (Quotes, estimates, breakdown of potential cost and how you arrived here)
$35,000 to refinish hydrants along main roads.
Annual Impact on Operating Budget: (Will we have an additional reoccurring operating cost?)
None
24
2027 CAPITAL IMPROVEMENT/EQUIPMENT PROGRAM (CIP/CEP)
2027 City of Oak Creek Annual Budget
Department:
Water & Sewer Utility (Distribution)
Contact Person:
Darrin Allard, Distribution Manager
Request Title:
Excavation Safety
General Description:
We are looking to add a larger road plate to be able to cover a bigger area on excavations in the roadway. We
are also looking to add a trench box that has end walls to give 4 sides of safety in an excavation.
Justification and Intent:
One road plate could take the place of two getting rid of a seam in the middle. A trench box with end walls will
make excavations safer from end wall cave ins.
Description of Alternatives:
Keep using the equipment we have. We have purchased engineered plywood that we use as makeshift end
walls.
Description of Disposal, if Applicable:
N/A
Impact on other Projects:
None
Cost Analysis: (Quotes, estimates, breakdown of potential cost and how you arrived here)
$30,000 should cover the cost of this new equipment for us.
Annual Impact on Operating Budget: (Will we have an additional reoccurring operating cost?)
None
25
26
2027 CAPITAL IMPROVEMENT/EQUIPMENT PROGRAM (CIP/CEP)
2027 City of Oak Creek Annual Budget
Department:
Water & Sewer Utility (Distribution)
Contact Person:
Darrin Allard, Distribution Manager
Request Title:
Headquarters Building Repairs
General Description:
The boilers that run our heating system need replacement. There will need to also be some building control
upgrades. Also, all three-exterior walk-thru doors to the garage need to be replaced.
Justification and Intent:
The boilers have been requiring major maintenance and the doors are rotted out.
Description of Alternatives:
Keep pouring money into the boilers. Keep allowing the natural daylight through the door frames.
Description of Disposal, if Applicable:
N/A
Impact on other Projects:
None
Cost Analysis: (Quotes, estimates, breakdown of potential cost and how you arrived here)
$150,000 should cover the cost of this new equipment for us.
Annual Impact on Operating Budget: (Will we have an additional reoccurring operating cost?)
None
27
28
29
30
31
32
2027 CAPITAL IMPROVEMENT/EQUIPMENT PROGRAM (CIP/CEP)
2027 City of Oak Creek Annual Budget
Department:
Water & Sewer Utility (Distribution)
Contact Person:
Darrin Allard, Distribution Manager
Request Title:
Water Storage Structure Maintenance
General Description:
Both water towers could use an exterior cleaning. The reservoir also requires an exterior cleaning along with
having a safety rail added to the roof.
Justification and Intent:
The tanks haven’t had the exterior cleaned in many years and they look dirty. The addition of the safety rail is
needed to be able to access the center of the reservoir.
Description of Alternatives:
Let them stay dirty. Climbing to the center of the reservoir without a safety cable is a safety issue and should be
addressed.
Description of Disposal, if Applicable:
N/A
Impact on other Projects:
None
Cost Analysis: (Quotes, estimates, breakdown of potential cost and how you arrived here)
$40,000 should cover the cost of the maintenance.
Annual Impact on Operating Budget: (Will we have an additional reoccurring operating cost?)
None
33
2027 CAPITAL IMPROVEMENT/EQUIPMENT PROGRAM (CIP/CEP)
2027 City of Oak Creek Annual Budget
Department:
Water & Sewer Utility (Engineering)
Contact Person:
Ashley Kiepczynski, Utility Engineer
Request Title:
GPS Survey Equipment
General Description:
Purchase a Trimble R980 Base GPS and TSC510 Data Collector
Justification and Intent:
The Utility uses the equipment for the location of existing mains, fiber and street lighting, as requested through
Diggers Hotline. The current equipment utilized to locate existing utilities was purchased in 2013 and uses a
local base station at the headquarters. In order to get a signal, a repeater must be used to get a signal from the
headquarters. The new GPS unit would eliminate the additional piece of equipment and would utilize
Wisconsin Continuously Operating Reference Station Network (WISCORS), a network of permanent reference
stations that the State maintains to permit the precise positioning and control in the field. The City, Utility, and
State started utilizing WISCORS a few years ago.
Description of Alternatives:
The Utility can continue to use the existing equipment and put off the purchase of a new GPS.
Description of Disposal, if Applicable:
Currently there are no discounts for the return of the old equipment. We intend to keep the unit as a backup.
Impact on other Projects:
N/A
Cost Analysis: (Quotes, estimates, breakdown of potential cost and how you arrived here)
The request is for the approval of the $38,000 expenditure. Seiler provided a quote for the equipment.
Annual Impact on Operating Budget: (Will we have an additional reoccurring operating cost?)
At this time there are no reoccurring costs for the WISCORS or Trimble fees. There is a possibility of a WISCORS
yearly fee for the service in the future.
34
35
36
2027 CAPITAL IMPROVEMENT/EQUIPMENT PROGRAM (CIP/CEP)
2027 City of Oak Creek Annual Budget
Department:
Water & Sewer Utility (Plant & HQ)
Contact Person:
Brian Johnston, Director of Utilities
Request Title:
Security and Access Control Replacement
General Description:
Design and replacement of the security system at the treatment plant and headquarters
Justification and Intent:
The software for the existing C cure system is outdated and is not upgradable to the new windows format. We
will need to evaluate the software and compatibility with the City’s security system. This will impact the
treatment plant, headquarters and remote stations with card readers. It is currently unknown if the software
upgrade will impact the existing card readers throughout the system. This may impact the remote stations with
card readers and video surveillance systems as well. The newest components in the system were installed in
2010.
Description of Alternatives:
N/A
Description of Disposal, if Applicable:
N/A
Impact on other Projects:
None
Cost Analysis: (Quotes, estimates, breakdown of potential cost and how you arrived here)
The design and replacement of the security system is estimated at $250,000. Project 19017 will be closed out
with $225,979.83 remaining in funding to be used towards this project.
Annual Impact on Operating Budget: (Will we have an additional reoccurring operating cost?)
None
37
2027 CAPITAL IMPROVEMENT/EQUIPMENT PROGRAM (CIP/CEP)
2027 City of Oak Creek Annual Budget
Department:
Water & Sewer Utility (Engineering)
Contact Person:
Brian Johnston, Director of Utilities
Request Title:
Remote station PLC Replacement
General Description:
Design and replacement of the existing programable logic controllers (PLC) in the remote stations
Justification and Intent:
The existing PLC units were installed in the late 1990’s and are well past their useful life. We have had several
component failures in the recent years. The water treatment plant replaced the PLC’s in 2025. We are now
looking at the replacement of the PLC’s in the remote stations. This involves Orchard Way Reservoir, three
pump stations, two water towers, two sanitary lift stations, two storm lift stations, and four-meter pits. This
will update the hardware that is no longer supported by the manufacturer.
Description of Alternatives:
N/A
Description of Disposal, if Applicable:
N/A
Impact on other Projects:
None
Cost Analysis: (Quotes, estimates, breakdown of potential cost and how you arrived here)
The design and replacement of the PLC’s at the remote stations is estimated at $250,000. Project 23114 will be
closed with a remaining budget of $149,606.32 to be used towards funding this project.
Annual Impact on Operating Budget: (Will we have an additional reoccurring operating cost?)
No impact to the operation budget
38
2027 CAPITAL IMPROVEMENT/EQUIPMENT PROGRAM (CIP/CEP)
2027 City of Oak Creek Annual Budget
Department:
Water & Sewer Utility (Engineering)
Contact Person:
Brian Johnston, Director of Utilities
Request Title:
Remote station radio replacement
General Description:
Design and replacement of the existing radios in the remote stations.
Justification and Intent:
The remote stations use radio waves to send information from the station back to the water treatment plant.
These radios allow the treatment plant operators to control the functions of the equipment at the stations and
gather data on system operations at the stations. The stations include Sycamore tower, Howell tower,
Treatment Plant, 22nd Street Booster Station, Police Department, Janat Drive Booster Station, Orchard Way
Reservoir, Headquarters, Rawson meter, Drexel meter, Puetz meter, Ryan meter and Franklin tower. This gives
the operator run time on pumps, tower elevation, chlorine residual, and turbidity at the stations. They also
allow access control and support the video surveillance system. The existing AirMux radios were installed
around 2013 and some of the CalAmp radios were installed in 2005. We have had several failures of the radio
equipment due to age. This system and the communication it facilitates is critical to the utility operations. Even
with the construction of fiber optic cable to some of the facilities, the radio system will be required as an online
redundant path. The existing units software is not compatible with the new radio units. The replacement will
provide reliable communication with the remote stations and the treatment plant.
Description of Alternatives:
N/A
Description of Disposal, if Applicable:
N/A
Impact on other Projects:
None
Cost Analysis: (Quotes, estimates, breakdown of potential cost and how you arrived here)
The design and replacement of the radios at the remote stations is estimated at $75,000. Project 23115 will be
closed out with a remaining budget of $73,583.15 that will be used towards funding this project.
Annual Impact on Operating Budget: (Will we have an additional reoccurring operating cost?)
No impact to the operation budget
39
2027 CAPITAL IMPROVEMENT/EQUIPMENT PROGRAM (CIP/CEP)
2027 City of Oak Creek Annual Budget
Department:
Water & Sewer Utility (Engineering)
Contact Person:
Ashley Kiepczynski, Utility Engineer
Request Title:
Oak Lane Water Main Looping Design and Construction
General Description:
Install 575 LF of 8-inch water main to complete water loop on E. Oak Lane
Justification and Intent:
The project will loop the 8-inch water main 575 LF, within City property, from the east end of E. Oak Lane to S.
Shepard Avenue. The current layout has four homes on a dead-end line with no hydrant after their laterals for
flushing of the main, in addition to several homes on the line that is not looped. This will improve water quality
to the residents and fire protection in the area.
Description of Alternatives:
N/A
Description of Disposal, if Applicable:
N/A
Impact on other Projects:
N/A
Cost Analysis: (Quotes, estimates, breakdown of potential cost and how you arrived here)
The design and construction of the water main looping project is $200,000.
Annual Impact on Operating Budget: (Will we have an additional reoccurring operating cost?)
No impact to the operating budget.
40
41
2027 CAPITAL IMPROVEMENT/EQUIPMENT PROGRAM (CIP/CEP)
2027 City of Oak Creek Annual Budget
Department:
Water & Sewer Utility (Engineering)
Contact Person:
Ashley Kiepczynski, Utility Engineer
Request Title:
Ryan Road and Howell Avenue Water Main Abandonment
General Description:
Abandon 130-ft of 30-inch DIP and 250-ft of 8-Inch DIP at the intersection of Ryan Road and Howell Avenue
Justification and Intent:
This project will abandon 130-ft of 30-inch ductile iron water main within the intersection and abandon 250-ft
of 8-inch ductile iron water main along the south side of E. Ryan Road. As part of the water main abandonment,
one water lateral (9502 S. Howell Ave.) will be impacted and is proposed to be relocated to a parallel water
main along the north side of E. Ryan Road. By abandoning portions of the water main within the intersection,
the water quality will be improved for the property located at the SE quadrant of the intersection and there will
be reduced maintenance costs for the Utility.
The work is anticipated to be completed prior to WisDOT’s road improvement project along S. Howell Avenue
and E. Ryan Road, anticipated to begin in spring 2027.
Description of Alternatives:
N/A
Description of Disposal, if Applicable:
N/A
Impact on other Projects:
N/A
Cost Analysis: (Quotes, estimates, breakdown of potential cost and how you arrived here)
The design of the water main abandonment and lateral relocation project was approved in 2026 and
construction of the project is $325,000.
Annual Impact on Operating Budget: (Will we have an additional reoccurring operating cost?)
No impact to the operating budget.
42
43
2027 CAPITAL IMPROVEMENT/EQUIPMENT PROGRAM (CIP/CEP)
2027 City of Oak Creek Annual Budget
Department:
Water & Sewer Utility (Engineering)
Contact Person:
Ashley Kiepczynski, Utility Engineer
Request Title:
S. 13th Street – Oakwood Road to Puetz Road Water and Sanitary Improvements
General Description:
Abandon 75-ft of 8-inch DIP, relocate hydrant, and adjust existing valves and sanitary sewer manholes
Justification and Intent:
Milwaukee County has a pavement replacement project scheduled for construction along S. 13th Street from
Oakwood Road to Puetz Road in 2028. Impacts to existing utilities are minimal. There is a 75-ft segment of
existing water main along Oakwood Road, at the intersection with S. 13 th Street, that will be abandoned, and one
hydrant to be relocated. This work will be completed prior to Milwaukee County’s project.
Additionally, adjustments and reconstructs of the existing valves and sanitary sewer manholes are required and
will be included with Milwaukee County's roadway reconstruction project. Utility will be responsible for 100%
of the costs.
Description of Alternatives:
N/A
Description of Disposal, if Applicable:
N/A
Impact on other Projects:
N/A
Cost Analysis: (Quotes, estimates, breakdown of potential cost and how you arrived here)
The design and construction of the project is $150,000.
Annual Impact on Operating Budget: (Will we have an additional reoccurring operating cost?)
No impact to the operating budget.
44
45
2027 CAPITAL IMPROVEMENT/EQUIPMENT PROGRAM (CIP/CEP)
2027 City of Oak Creek Annual Budget
Department:
Water & Sewer Utility (Engineering)
Contact Person:
Ashley Kiepczynski, Utility Engineer
Request Title:
S. Chicago Road – County Line to Forest Hill Water and Sanitary Improvements
General Description:
Relay water main and sanitary sewer, install sanitary manholes, relocate hydrants, and adjust existing valves,
water manholes, and sanitary sewer manholes
Justification and Intent:
The project will relay 16-inch and 20-inch DIP pipe from 1979. The main has experienced several breaks, and a
recent condition assessment identified multiple segments as being in poor or critical condition. The project also
includes the relocation of 3 hydrants and a section of 8-inch sanitary sewer main.
WisDOT has scheduled a pavement replacement project to start construction in 2029 along S. Chicago from
County Line road to Forest Hill Avenue and the utility work will be completed in advance of the project.
Adjustments and reconstructs of the existing valves, water manholes, and sanitary sewer manholes are required
and will be included with WisDOT’s roadway reconstruction project. The Utility will be responsible for 100% of
the costs.
Description of Alternatives:
N/A
Description of Disposal, if Applicable:
N/A
Impact on other Projects:
N/A
Cost Analysis: (Quotes, estimates, breakdown of potential cost and how you arrived here)
The design and construction of the project is $2,000,000.
Annual Impact on Operating Budget: (Will we have an additional reoccurring operating cost?)
No impact to the operating budget.
46
PIA-Global
Page 78 of 254S. Chicago Road transmission main, Oak Creek WI ·p-CAT Sonic condition assessment v3_0_0
OC-01
86964 to 91209 (crew labels V1 to H1)
weakest segment
Poor
66 ft
of segments Poor or
worse
0.2222 in
weakest segment,
52.9% of Class 52, at
73.99 ft
8 yrs
shortest segment life
0.296 in
section wall, 71% of
Class 52
334 ft
20-inch laid 1979,
chainage 0–345
On this section
1 hydrant valve, 2 reducers, 2 tees, 1 valve,
counting the fittings at the stations at
each end.
Branches
30-inch DIP branch at 83 ft
6-inch DIP hydrant lateral at 345 ft
Repairs and construction on record
repair clamp at 75 ft, April 1, 1993
City notes, October 28, and our reply
"Aerial doesn't match" (173 ft)
The maps draw the main on the
City's GIS line. It passes through the
City's GPS positions of the valves,
hydrants and fittings on the main, so
it is close to where the main lies; the
line of the main on the as-built
drawings is also drawn on this
page's map for comparison.
Budget range, 334 ft
Open-cut replacement $55k–$152k;
structural CIPP $73k–$130k (pipe or liner
item only, 2026 dollars; see Rehabilitation
options).
Site photographs here
none with a location on this section
47
PIA-Global
Page 79 of 254S. Chicago Road transmission main, Oak Creek WI ·p-CAT Sonic condition assessment v3_0_0
OC-02
91209 to 91208 (crew labels H1 to H2)
weakest segment
Critical
463 ft
of segments Poor or
worse
0.1912 in
weakest segment,
45.5% of Class 52, at
345.30 ft
2 yrs
shortest segment life
0.227 in
section wall, 54% of
Class 52
463 ft
20-inch laid 1979,
chainage 345–793
On this section
2 bends, 2 hydrant valves, 1 sleeve, 3 tees, 1
valve, counting the fittings at the stations
at each end.
Branches
6-inch DIP hydrant lateral at 793 ft
Repairs and construction on record
construction sleeve at 438 ft
Budget range, 463 ft
Open-cut replacement $77k–$211k;
structural CIPP $101k–$181k (pipe or liner
item only, 2026 dollars; see Rehabilitation
options).
Site photographs here
none with a location on this section
48
PIA-Global
Page 80 of 254S. Chicago Road transmission main, Oak Creek WI ·p-CAT Sonic condition assessment v3_0_0
OC-03
91208 to 91216 (crew labels H2 to H3)
weakest segment
Poor
103 ft
of segments Poor or
worse
0.2335 in
weakest segment,
55.6% of Class 52, at
1,092.70 ft
9 yrs
shortest segment life
0.286 in
section wall, 68% of
Class 52
308 ft
20-inch laid 1979,
chainage 793–1,099
On this section
1 hydrant valve, 2 tees, counting the fittings
at the stations at each end.
Branches
12-inch DIP branch at 1,099 ft
Repairs and construction on record
none on the City's records
City notes, October 28, and our reply
"H3-91216 off 12" PVC main. Does this
impact soundings?" (1,070 ft)
Yes. The signal comes to the sensor
at 91216 through the 12-inch PVC
branch and the hydrant lead, and
that path is taken into the timing of
OC-03 and OC-04 (Other
observations).
"Hwy 100" marked at the 1,100 ft tick
of the OC-03 profile (meaning to
confirm) (1,099 ft)
WI 100 (W. Ryan Road) crosses the
main at about 1,099 ft, by hydrant
91216, where the mark is; we read it
as that crossing, to be confirmed
with the City.
Site photographs here
none with a location on this section
49
PIA-Global
Page 81 of 254S. Chicago Road transmission main, Oak Creek WI ·p-CAT Sonic condition assessment v3_0_0
Budget range, 308 ft
Open-cut replacement $51k–$140k;
structural CIPP $67k–$120k (pipe or liner
item only, 2026 dollars; see Rehabilitation
options).
50
PIA-Global
Page 82 of 254S. Chicago Road transmission main, Oak Creek WI ·p-CAT Sonic condition assessment v3_0_0
OC-04
91216 to 91207DD (crew labels H3 to H4)
weakest segment
Critical
12 ft
of segments Poor or
worse
0.1627 in
weakest segment,
38.7% of Class 52, at
1,245.48 ft
under 1 year
shortest segment life
0.286 in
section wall, 68% of
Class 52
152 ft
20-inch laid 1979,
chainage 1,099–1,252
On this section
1 hydrant valve, 2 tees, counting the fittings
at the stations at each end.
Branches
6-inch DIP hydrant lateral at 1,252 ft
Repairs and construction on record
none on the City's records
Budget range, 152 ft
Open-cut replacement $25k–$69k;
structural CIPP $33k–$59k (pipe or liner
item only, 2026 dollars; see Rehabilitation
options).
Site photographs here
none with a location on this section
51
PIA-Global
Page 83 of 254S. Chicago Road transmission main, Oak Creek WI ·p-CAT Sonic condition assessment v3_0_0
OC-05
91207DD to 91206 (crew labels H4 to H5)
weakest segment
Fair
0 ft
of segments Poor or
worse
0.3024 in
weakest segment,
72.0% of Class 52, at
1,310.92 ft
38 yrs
shortest segment life
0.320 in
section wall, 76% of
Class 52
317 ft
20-inch laid 1979,
chainage 1,252–1,566
On this section
2 hydrant valves, 3 tees, counting the
fittings at the stations at each end.
Branches
6-inch DIP hydrant lateral at 1,566 ft
Repairs and construction on record
none on the City's records
Budget range, 317 ft
Open-cut replacement $53k–$145k;
structural CIPP $69k–$124k (pipe or liner
item only, 2026 dollars; see Rehabilitation
options).
Site photographs here
none with a location on this section
52
PIA-Global
Page 84 of 254S. Chicago Road transmission main, Oak Creek WI ·p-CAT Sonic condition assessment v3_0_0
OC-06
91206 to 91202 (crew labels H5 to H6)
weakest segment
Fair
0 ft
of segments Poor or
worse
0.3227 in
weakest segment,
76.8% of Class 52, at
1,679.69 ft
52 yrs
shortest segment life
0.340 in
section wall, 81% of
Class 52
443 ft
20-inch laid 1979,
chainage 1,566–2,009
On this section
2 hydrant valves, 2 sleeves, 5 tees, 2 valves,
counting the fittings at the stations at
each end.
Branches
8-inch DIP branch at 1,964 ft
8-inch DIP branch at 1,972 ft
6-inch DIP hydrant lateral at 2,009 ft
Repairs and construction on record
valve cut-in at 1,945 ft, August 15,
2017
valve cut-in at 2,000 ft, August 15,
2017
Budget range, 443 ft
Open-cut replacement $74k–$202k;
structural CIPP $97k–$173k (pipe or liner
item only, 2026 dollars; see Rehabilitation
options).
Site photographs here
IMG_2689.HEI
C
IMG_2690.HEI
C
IMG_2691.HEIC
53
PIA-Global
Page 85 of 254S. Chicago Road transmission main, Oak Creek WI ·p-CAT Sonic condition assessment v3_0_0
OC-07
91202 to 91201 (crew labels H6 to H7)
weakest segment
Poor
436 ft
of segments Poor or
worse
0.2176 in
weakest segment,
51.8% of Class 52, at
2,267.21 ft
7 yrs
shortest segment life
0.231 in
section wall, 55% of
Class 52
436 ft
20-inch laid 1979,
chainage 2,009–2,448
On this section
1 air vent, 2 hydrant valves, 3 tees, counting
the fittings at the stations at each end.
Branches
6-inch DIP hydrant lateral at 2,448 ft
Repairs and construction on record
none on the City's records
Budget range, 436 ft
Open-cut replacement $72k–$199k;
structural CIPP $95k–$170k (pipe or liner
item only, 2026 dollars; see Rehabilitation
options).
Site photographs here
IMG_2689.HEI
C
IMG_2690.HEI
C
IMG_2691.HEIC
54
PIA-Global
Page 86 of 254S. Chicago Road transmission main, Oak Creek WI ·p-CAT Sonic condition assessment v3_0_0
OC-08
91201 to 91818DD (crew labels H7 to H8)
weakest segment
Fair
0 ft
of segments Poor or
worse
0.2796 in
weakest segment,
66.6% of Class 52, at
2,447.50 ft
28 yrs
shortest segment life
0.323 in
section wall, 77% of
Class 52
404 ft
20-inch laid 1979,
chainage 2,448–2,854
On this section
2 hydrant valves, 5 tees, 1 valve, counting
the fittings at the stations at each end.
Branches
12-inch DIP branch at 2,790 ft
12-inch DIP branch at 2,821 ft
6-inch DIP hydrant lateral at 2,854 ft
Repairs and construction on record
none on the City's records
Budget range, 404 ft
Open-cut replacement $67k–$184k;
structural CIPP $88k–$158k (pipe or liner
item only, 2026 dollars; see Rehabilitation
options).
Site photographs here
IMG_2700.HEI
C
IMG_2701.HEIC
IMG_2702.HEI
C
55
PIA-Global
Page 87 of 254S. Chicago Road transmission main, Oak Creek WI ·p-CAT Sonic condition assessment v3_0_0
OC-09
91818DD to 91817 (crew labels H8 to 91817)
weakest segment
Critical
361 ft
of segments Poor or
worse
0.2073 in
weakest segment,
49.4% of Class 52, at
2,932.29 ft
6 yrs
shortest segment life
0.256 in
section wall, 61% of
Class 52
500 ft
20-inch laid 1979,
chainage 2,854–3,353
On this section
1 air vent, 2 hydrant valves, 3 tees, counting
the fittings at the stations at each end.
Branches
6-inch DIP hydrant lateral at 3,353 ft
Repairs and construction on record
repair clamp at 3,322 ft, January 17,
2025
repair clamp at 3,324 ft, January 11,
2025
Budget range, 500 ft
Open-cut replacement $83k–$228k;
structural CIPP $109k–$195k (pipe or liner
item only, 2026 dollars; see Rehabilitation
options).
Site photographs here
IMG_2701.HEIC
IMG_2702.HEI
C
56
PIA-Global
Page 88 of 254S. Chicago Road transmission main, Oak Creek WI ·p-CAT Sonic condition assessment v3_0_0
OC-10
91817 to 91815
weakest segment
Critical
515 ft
of segments Poor or
worse
0.1156 in
weakest segment,
27.5% of Class 52, at
3,591.26 ft
under 1 year
shortest segment life
0.237 in
section wall, 56% of
Class 52
735 ft
20-inch laid 1979,
chainage 3,353–4,089
On this section
3 hydrant valves, 7 tees, counting the
fittings at the stations at each end.
Branches
6-inch DIP hydrant lateral at 3,721 ft
8-inch DIP branch at 4,029 ft
6-inch DIP hydrant lateral at 4,089 ft
Repairs and construction on record
repair clamp at 3,376 ft, January 9,
2025
City notes, October 28, and our reply
X on the map just south of hydrant
91817 (the 1-9-25 repair clamp)
(3,361 ft)
Shown as the repair clamp of
January 9, 2025, 23 ft south of
hydrant 91817.
Budget range, 735 ft
Open-cut replacement $122k–$335k;
structural CIPP $160k–$287k (pipe or liner
item only, 2026 dollars; see Rehabilitation
options).
Site photographs here
IMG_2706.HEI
C
IMG_2707.HEI
C
57
PIA-Global
Page 89 of 254S. Chicago Road transmission main, Oak Creek WI ·p-CAT Sonic condition assessment v3_0_0
OC-11
91815 to 91704
weakest segment
Poor
115 ft
of segments Poor or
worse
0.2463 in
weakest segment,
58.6% of Class 52, at
4,088.80 ft
12 yrs
shortest segment life
0.280 in
section wall, 67% of
Class 52
315 ft
20-inch laid 1979,
chainage 4,089–4,403
On this section
1 air vent, 2 hydrant valves, 3 tees, counting
the fittings at the stations at each end.
Branches
6-inch DIP branch at 4,296 ft
6-inch DIP hydrant lateral at 4,403 ft
Repairs and construction on record
none on the City's records
Budget range, 315 ft
Open-cut replacement $52k–$144k;
structural CIPP $69k–$123k (pipe or liner
item only, 2026 dollars; see Rehabilitation
options).
Site photographs here
IMG_20260901
_232950_289.
jpg
IMG_20260901
_233007_063.
jpg
IMG_2708.HEI
C
58
PIA-Global
Page 90 of 254S. Chicago Road transmission main, Oak Creek WI ·p-CAT Sonic condition assessment v3_0_0
OC-12
91704 to 91703
weakest segment
Poor
102 ft
of segments Poor or
worse
0.2378 in
weakest segment,
56.6% of Class 52, at
4,474.32 ft
11 yrs
shortest segment life
0.282 in
section wall, 67% of
Class 52
270 ft
20-inch laid 1979,
chainage 4,403–4,670
On this section
2 hydrant valves, 2 tees, counting the
fittings at the stations at each end.
Branches
6-inch DIP hydrant lateral at 4,670 ft
Repairs and construction on record
none on the City's records
Budget range, 270 ft
Open-cut replacement $45k–$123k;
structural CIPP $59k–$105k (pipe or liner
item only, 2026 dollars; see Rehabilitation
options).
Site photographs here
IMG_20260901
_232950_289.
jpg
IMG_20260901
_233007_063.
jpg
IMG_20260901
_235411_557.j
pg
59
PIA-Global
Page 91 of 254S. Chicago Road transmission main, Oak Creek WI ·p-CAT Sonic condition assessment v3_0_0
OC-13
91703 to 91702
weakest segment
Fair
0 ft
of segments Poor or
worse
0.2908 in
weakest segment,
69.2% of Class 52, at
4,747.78 ft
33 yrs
shortest segment life
0.301 in
section wall, 72% of
Class 52
500 ft
20-inch laid 1979,
chainage 4,670–5,165
On this section
1 bend, 2 hydrant valves, 1 sleeve, 5 tees, 1
valve, counting the fittings at the stations
at each end.
Branches
8-inch DIP branch at 4,703 ft
8-inch DIP branch at 4,708 ft
6-inch DIP hydrant lateral at 5,165 ft
Repairs and construction on record
construction sleeve at 4,796 ft
Budget range, 500 ft
Open-cut replacement $83k–$228k;
structural CIPP $109k–$195k (pipe or liner
item only, 2026 dollars; see Rehabilitation
options).
Site photographs here
IMG_20260901
_235411_557.j
pg
IMG_20260901
_235451_610.j
pg
IMG_2026090
2_000742_70
0.jpg
60
PIA-Global
Page 92 of 254S. Chicago Road transmission main, Oak Creek WI ·p-CAT Sonic condition assessment v3_0_0
OC-14
91702 to 91701
weakest segment
Poor
72 ft
of segments Poor or
worse
0.2241 in
weakest segment,
53.3% of Class 52, at
5,165.30 ft
8 yrs
shortest segment life
0.304 in
section wall, 72% of
Class 52
404 ft
20-inch laid 1979,
chainage 5,165–5,570
On this section
2 hydrant valves, 3 tees, counting the
fittings at the stations at each end.
Branches
6-inch DIP hydrant lateral at 5,570 ft
Repairs and construction on record
none on the City's records
Budget range, 404 ft
Open-cut replacement $67k–$184k;
structural CIPP $88k–$157k (pipe or liner
item only, 2026 dollars; see Rehabilitation
options).
Site photographs here
IMG_2026090
2_000742_70
0.jpg
IMG_2026090
2_001114_950.j
pg
IMG_2026090
2_001225_924
.jpg
61
PIA-Global
Page 93 of 254S. Chicago Road transmission main, Oak Creek WI ·p-CAT Sonic condition assessment v3_0_0
OC-15
91701 to V96202 (crew labels 91701 to V2)
weakest segment
Poor
23 ft
of segments Poor or
worse
0.2447 in
weakest segment,
58.3% of Class 52, at
5,570.20 ft
11 yrs
shortest segment life
0.277 in
section wall, 66% of
Class 52
80 ft
20-inch laid 1979,
chainage 5,570–5,650
On this section
1 hydrant valve, 1 reducer, 4 tees, 2 valves,
counting the fittings at the stations at
each end.
Branches
12-inch DIP branch at 5,610 ft
12-inch DIP branch at 5,614 ft
20-inch DIP branch at 5,627 ft
Repairs and construction on record
none on the City's records
City notes, October 28, and our reply
Trench patch south of Oakwood Rd:
"road patch to east of water, just
road work" (5,634 ft)
Not a repair to the main; the site
photograph is captioned as road
work off the main.
Budget range, 80 ft
Open-cut replacement $13k–$36k;
structural CIPP $17k–$31k (pipe or liner item
only, 2026 dollars; see Rehabilitation
options).
Site photographs here
IMG_2026090
2_002155_243
.jpg
IMG_2026090
2_002254_68
3.jpg
IMG_2713.HEIC
62
PIA-Global
Page 94 of 254S. Chicago Road transmission main, Oak Creek WI ·p-CAT Sonic condition assessment v3_0_0
OC-16
V96202 to 96201DD (crew labels V2 to 96201DD)
weakest segment
Poor
162 ft
of segments Poor or
worse
0.2450 in
weakest segment,
61.2% of Class 52, at
5,661.62 ft
15 yrs
shortest segment life
0.257 in
section wall, 64% of
Class 52
245 ft
16-inch laid 1979,
chainage 5,650–5,894
On this section
1 air vent, 1 hydrant valve, 2 tees, 1 valve,
counting the fittings at the stations at
each end.
Branches
6-inch DIP hydrant lateral at 5,894 ft
Repairs and construction on record
none on the City's records
Budget range, 245 ft
Open-cut replacement $41k–$112k;
structural CIPP $53k–$96k (pipe or liner
item only, 2026 dollars; see Rehabilitation
options).
Site photographs here
IMG_2719.HEIC
IMG_2720.HEI
C
IMG_2721.HEIC
63
PIA-Global
Page 95 of 254S. Chicago Road transmission main, Oak Creek WI ·p-CAT Sonic condition assessment v3_0_0
OC-17
96201DD to 96202
weakest segment
Poor
18 ft
of segments Poor or
worse
0.2480 in
weakest segment,
62.0% of Class 52, at
5,942.47 ft
16 yrs
shortest segment life
0.303 in
section wall, 76% of
Class 52
362 ft
16-inch laid 1979,
chainage 5,894–6,257
On this section
2 hydrant valves, 3 tees, counting the
fittings at the stations at each end.
Branches
6-inch DIP hydrant lateral at 6,257 ft
Repairs and construction on record
repair clamp at 5,954 ft, January 13,
2016
repair clamp at 6,158 ft, October 3,
2013
Budget range, 362 ft
Open-cut replacement $60k–$165k;
structural CIPP $79k–$141k (pipe or liner
item only, 2026 dollars; see Rehabilitation
options).
Site photographs here
IMG_2026090
2_003104_00
4.jpg
IMG_2721.HEIC
IMG_2722.HEI
C
64
PIA-Global
Page 96 of 254S. Chicago Road transmission main, Oak Creek WI ·p-CAT Sonic condition assessment v3_0_0
OC-18
96202 to 96204
weakest segment
Poor
12 ft
of segments Poor or
worse
0.2475 in
weakest segment,
61.9% of Class 52, at
6,256.90 ft
16 yrs
shortest segment life
0.286 in
section wall, 72% of
Class 52
348 ft
16-inch laid 1979,
chainage 6,257–6,601
On this section
2 hydrant valves, 4 tees, counting the
fittings at the stations at each end.
Branches
8-inch DIP branch at 6,290 ft
6-inch DIP hydrant lateral at 6,601 ft
Repairs and construction on record
none on the City's records
Budget range, 348 ft
Open-cut replacement $58k–$159k;
structural CIPP $76k–$136k (pipe or liner
item only, 2026 dollars; see Rehabilitation
options).
Site photographs here
IMG_2026090
2_003104_00
4.jpg
IMG_2026090
2_003736_52
3.jpg
IMG_2026090
2_003820_02
5.jpg
65
PIA-Global
Page 97 of 254S. Chicago Road transmission main, Oak Creek WI ·p-CAT Sonic condition assessment v3_0_0
OC-19
96204 to 96220
weakest segment
Good
0 ft
of segments Poor or
worse
0.3212 in
weakest segment,
80.3% of Class 52, at
6,775.57 ft
68 yrs
shortest segment life
0.333 in
section wall, 83% of
Class 52
364 ft
16-inch laid 1979,
chainage 6,601–6,968
On this section
2 air vents, 2 bends, 1 hydrant valve, 1
sleeve, 3 tees, 1 valve, counting the fittings
at the stations at each end.
Branches
6-inch DIP branch at 6,968 ft
Repairs and construction on record
valve cut-in at 6,792 ft, January 13,
2016
Budget range, 364 ft
Open-cut replacement $61k–$166k;
structural CIPP $79k–$142k (pipe or liner
item only, 2026 dollars; see Rehabilitation
options).
Site photographs here
IMG_2026090
2_003736_52
3.jpg
IMG_2026090
2_003820_02
5.jpg
IMG_2026090
2_005537_83
9.jpg
66
PIA-Global
Page 98 of 254S. Chicago Road transmission main, Oak Creek WI ·p-CAT Sonic condition assessment v3_0_0
OC-20
96220 to 96205
weakest segment
Fair
0 ft
of segments Poor or
worse
0.2644 in
weakest segment,
66.1% of Class 52, at
7,141.50 ft
28 yrs
shortest segment life
0.280 in
section wall, 70% of
Class 52
388 ft
16-inch laid 1979,
chainage 6,968–7,356
On this section
1 hydrant valve, 3 tees, counting the fittings
at the stations at each end.
Branches
6-inch DIP hydrant lateral at 7,356 ft
Repairs and construction on record
none on the City's records
City notes, October 28, and our reply
Station label 96225 corrected to
96205 (7,357 ft)
The station is hydrant 96205 in this
report; the recording file names
keep the crew's label.
Budget range, 388 ft
Open-cut replacement $64k–$177k;
structural CIPP $85k–$151k (pipe or liner
item only, 2026 dollars; see Rehabilitation
options).
Site photographs here
IMG_2026090
2_005537_83
9.jpg
IMG_2026090
2_011745_530.
jpg
IMG_2728.HEI
C
67
PIA-Global
Page 99 of 254S. Chicago Road transmission main, Oak Creek WI ·p-CAT Sonic condition assessment v3_0_0
OC-21
96205 to 96206
weakest segment
Critical
403 ft
of segments Poor or
worse
0.1671 in
weakest segment,
41.8% of Class 52, at
7,626.97 ft
1 yrs
shortest segment life
0.211 in
section wall, 53% of
Class 52
403 ft
16-inch laid 1979,
chainage 7,356–7,759
On this section
4 bends, 2 hydrant valves, 4 tees, counting
the fittings at the stations at each end.
Branches
8-inch DIP branch at 7,756 ft
6-inch DIP hydrant lateral at 7,759 ft
Repairs and construction on record
repair clamp at 7,621 ft, June 16, 2016
City notes, October 28, and our reply
"aerial doesn't match up" (7,558 ft)
The maps draw the main on the
City's GIS line. It passes through the
City's GPS positions of the valves,
hydrants and fittings on the main, so
it is close to where the main lies; the
line of the main on the as-built
drawings is also drawn on this
page's map for comparison.
Budget range, 403 ft
Open-cut replacement $67k–$184k;
structural CIPP $88k–$157k (pipe or liner
item only, 2026 dollars; see Rehabilitation
options).
Site photographs here
IMG_2026090
2_011745_530.
jpg
IMG_2026090
2_013154_038.
jpg
IMG_2726.HEI
C
68
PIA-Global
Page 100 of 254S. Chicago Road transmission main, Oak Creek WI ·p-CAT Sonic condition assessment v3_0_0
OC-22
96206 to 96701
weakest segment
Poor
826 ft
of segments Poor or
worse
0.2023 in
weakest segment,
50.6% of Class 52, at
8,231.13 ft
7 yrs
shortest segment life
0.226 in
section wall, 56% of
Class 52
832 ft
16-inch laid 1979 and
1992, chainage 7,759–
8,591
On this section
2 bends, 2 hydrant valves, 1 sleeve, 5 tees, 1
valve, counting the fittings at the stations
at each end.
Branches
12-inch DIP branch at 8,266 ft
12-inch DIP branch at 8,271 ft
6-inch DIP hydrant lateral at 8,591 ft
Repairs and construction on record
construction sleeve at 8,366 ft
City notes, October 28, and our reply
Line on the profile between "11-15-
79" and "8-24-92" (the 1979 / 1992
change), about 8,280 ft (8,280 ft)
The change is taken at about 8,351 ft,
midway between the contract joint
on the as-built drawings (about
8,335 ft) and the City's construction
sleeve (8,366 ft); to be confirmed
with the City.
Budget range, 832 ft
Open-cut replacement $138k–$379k;
structural CIPP $181k–$324k (pipe or liner
item only, 2026 dollars; see Rehabilitation
options).
Site photographs here
IMG_2026090
2_013154_038.
jpg
IMG_2026090
2_014951_887.
jpg
69
PIA-Global
Page 101 of 254S. Chicago Road transmission main, Oak Creek WI ·p-CAT Sonic condition assessment v3_0_0
OC-23
96701 to 96702
weakest segment
Fair
0 ft
of segments Poor or
worse
0.2950 in
weakest segment,
73.7% of Class 52, at
8,931.90 ft
32 yrs
shortest segment life
0.334 in
section wall, 83% of
Class 52
556 ft
16-inch laid 1992,
chainage 8,591–9,147
On this section
2 hydrant valves, 2 tees, 1 valve, counting
the fittings at the stations at each end.
Branches
6-inch DIP hydrant lateral at 9,147 ft
Repairs and construction on record
none on the City's records
Budget range, 556 ft
Open-cut replacement $92k–$254k;
structural CIPP $121k–$217k (pipe or liner
item only, 2026 dollars; see Rehabilitation
options).
Site photographs here
IMG_2026090
2_022429_84
7.jpg
IMG_2026090
2_022528_60
7.jpg
70
PIA-Global
Page 102 of 254S. Chicago Road transmission main, Oak Creek WI ·p-CAT Sonic condition assessment v3_0_0
OC-24
96702 to 96703DD
weakest segment
Good
0 ft
of segments Poor or
worse
0.3209 in
weakest segment,
80.2% of Class 52, at
9,147.20 ft
61 yrs
shortest segment life
0.340 in
section wall, 85% of
Class 52
679 ft
16-inch laid 1992,
chainage 9,147–9,855
On this section
4 bends, 2 hydrant valves, 2 tees, counting
the fittings at the stations at each end.
Branches
6-inch DIP hydrant lateral at 9,855 ft
Repairs and construction on record
none on the City's records
City notes, October 28, and our reply
"linework and aerial don't match"
(9,501 ft)
The maps draw the main on the
City's GIS line. It passes through the
City's GPS positions of the valves,
hydrants and fittings on the main, so
it is close to where the main lies; the
line of the main on the as-built
drawings is also drawn on this
page's map for comparison. Along
the GIS line OC-24 is 29 ft longer
than the pipe on the as-built
drawings; the report uses the
drawings' pipe length.
Site photographs here
IMG_2026090
2_022429_84
7.jpg
IMG_2026090
2_022831_052
.jpg
IMG_2026090
2_023046_95
6.jpg
71
PIA-Global
Page 103 of 254S. Chicago Road transmission main, Oak Creek WI ·p-CAT Sonic condition assessment v3_0_0
Budget range, 679 ft
Open-cut replacement $113k–$310k;
structural CIPP $148k–$265k (pipe or liner
item only, 2026 dollars; see Rehabilitation
options).
72
PIA-Global
Page 104 of 254S. Chicago Road transmission main, Oak Creek WI ·p-CAT Sonic condition assessment v3_0_0
OC-25
96703DD to 96704
weakest segment
Fair
0 ft
of segments Poor or
worse
0.2785 in
weakest segment,
69.6% of Class 52, at
9,855.00 ft
25 yrs
shortest segment life
0.325 in
section wall, 81% of
Class 52
620 ft
16-inch laid 1992,
chainage 9,855–10,475
On this section
2 hydrant valves, 2 tees, 1 valve, counting
the fittings at the stations at each end.
Branches
6-inch DIP hydrant lateral at 10,475 ft
Repairs and construction on record
none on the City's records
Budget range, 620 ft
Open-cut replacement $103k–$283k;
structural CIPP $135k–$242k (pipe or liner
item only, 2026 dollars; see Rehabilitation
options).
Site photographs here
IMG_2026090
2_023046_95
6.jpg
IMG_2026090
2_024851_087
.jpg
73
PIA-Global
Page 105 of 254S. Chicago Road transmission main, Oak Creek WI ·p-CAT Sonic condition assessment v3_0_0
OC-26
96704 to 96705
weakest segment
Poor
90 ft
of segments Poor or
worse
0.2348 in
weakest segment,
58.7% of Class 52, at
10,601.52 ft
9 yrs
shortest segment life
0.311 in
section wall, 78% of
Class 52
628 ft
16-inch laid 1992,
chainage 10,475–11,099
On this section
1 hydrant valve, 1 sleeve, 2 tees, 1 valve,
counting the fittings at the stations at
each end.
Branches
12-inch DIP branch at 11,099 ft
Repairs and construction on record
valve cut-in at 10,888 ft, December 11,
2013
City notes, October 28, and our reply
"aerial doesn't match" (10,787 ft)
The maps draw the main on the
City's GIS line. It passes through the
City's GPS positions of the valves,
hydrants and fittings on the main, so
it is close to where the main lies; the
line of the main on the as-built
drawings is also drawn on this
page's map for comparison.
Budget range, 628 ft
Open-cut replacement $104k–$286k;
structural CIPP $137k–$245k (pipe or liner
item only, 2026 dollars; see Rehabilitation
options).
Site photographs here
IMG_2026090
2_024851_087
.jpg
IMG_2026090
2_030510_94
2.jpg
IMG_2026090
2_035055_49
7.jpg
74
75
76
2027 CAPITAL IMPROVEMENT/EQUIPMENT PROGRAM (CIP/CEP)
2027 City of Oak Creek Annual Budget
Department:
Water & Sewer Utility (Engineering)
Contact Person:
Ashley Kiepczynski, Utility Engineer
Request Title:
Wake Forest Court and Wake Forest Drive Water Main Relay Design
General Description:
Relay 930 LF of the 1966 8-inch DIP along Wake Forest Drive and 160 LF of 1966 6-inch DIP along Wake Forest
Court
Justification and Intent:
This project will replace 930 LF of the 1966 8-inch DIP with 8-inch PVC water main along S. Wake Forest Drive
and will replace 160 LF of the 1966 6-inch DIP with 8-inch PVC along W. Wake Forest Court. The water laterals
from the main to the curb stops will also be replaced. This project will improve flow by addressing mineral
build-up and by upsizing the existing 6-inch water main to the Utility’s standard 8-inch main for residential
areas.
Description of Alternatives:
N/A
Description of Disposal, if Applicable:
N/A
Impact on other Projects:
N/A
Cost Analysis: (Quotes, estimates, breakdown of potential cost and how you arrived here)
The design of the water main relay project is $50,000.
Annual Impact on Operating Budget: (Will we have an additional reoccurring operating cost?)
No impact to the operating budget.
77
78
2027 CAPITAL IMPROVEMENT/EQUIPMENT PROGRAM (CIP/CEP)
2027 City of Oak Creek Annual Budget
Department:
Water & Sewer Utility (Engineering)
Contact Person:
Ashley Kiepczynski, Utility Engineer
Request Title:
S. Howell Avenue Roadway Patches
General Description:
Reimburse WisDOT’s contractor to repair areas that have settled from the Utility’s Howell Avenue water main
relay project
Justification and Intent:
The Wisconsin Department of Transportation (WisDOT) plans to rehabilitate S. Howell Avenue in 2027. In
December 2025, the Common Council approved Resolution No. 12642‑121625, authorizing the State Municipal
Financial Agreement (SMFA) for the State‑Let Highway Project. Under this agreement, the City is responsible for
100% of the non‑participating costs, totaling $247,000. These municipal costs will cover repairs to areas that
have settled due to the Utility’s Howell Avenue water main relay project and past water main breaks. The unit
prices from the project bid have lowered this amount to $116,000
Description of Alternatives:
N/A
Description of Disposal, if Applicable:
N/A
Impact on other Projects:
N/A
Cost Analysis: (Quotes, estimates, breakdown of potential cost and how you arrived here)
The construction of the pavement repairs is $150,000.
Annual Impact on Operating Budget: (Will we have an additional reoccurring operating cost?)
No impact to the operating budget.
79
2027 CAPITAL IMPROVEMENT/EQUIPMENT PROGRAM (CIP/CEP)
2027 City of Oak Creek Annual Budget
Department:
Water & Sewer Utility (Engineering)
Contact Person:
Ashley Kiepczynski, Utility Engineer
Request Title:
Water Quality Monitors
General Description:
Installing water quality monitors throughout the water system to continuously test the water
Justification and Intent:
Install water quality monitors at various locations in the water system to monitor the water parameters in the
distribution system.
Description of Alternatives:
N/A
Description of Disposal, if Applicable:
N/A
Impact on other Projects:
N/A
Cost Analysis: (Quotes, estimates, breakdown of potential cost and how you arrived here)
The design and construction of the monitoring project is $150,000.
Annual Impact on Operating Budget: (Will we have an additional reoccurring operating cost?)
No impact to the operating budget.
80
81
2027 CAPITAL IMPROVEMENT/EQUIPMENT PROGRAM (CIP/CEP)
2027 City of Oak Creek Annual Budget
Department:
Water & Sewer Utility (Engineering)
Contact Person:
Ashley Kiepczynski, Utility Engineer
Request Title:
Large DIP Pipeline Condition Assessment
General Description:
Perform a pipeline condition assessment and leak detection to evaluate the existing 20’’ and 24’’ DIP along E.
Puetz Road and S. 10th Street.
Justification and Intent:
The project will perform a pipeline condition assessment and leak detection evaluation of the existing 20-inch
and 24-inch ductile iron water mains along E. Puetz Road from Nicholson Road to S. Chicago Road and along S.
10th Street from W. Drexel Avenue to W. Rawson Avenue. This assessment will provide critical information on
pipeline condition, remaining wall thickness, and the presence of active leaks to support asset management and
future capital planning.
The Utility previously completed a successful pipeline condition and leak detection assessment along S. Chicago
Road and intends to utilize the same technology. The p-CAT sonic technology is a non-invasive assessment
method that evaluates pipeline condition by measuring remaining pipe wall thickness and identifying active
leaks without excavation or service disruption.
The results will help the Utility identify deteriorated pipe segments, prioritize future projects, reduce the risk of
unexpected failures, and improve the reliability of the water distribution system.
Description of Alternatives:
N/A
Description of Disposal, if Applicable:
N/A
Impact on other Projects:
N/A
Cost Analysis: (Quotes, estimates, breakdown of potential cost and how you arrived here)
The condition assessment project is $125,000.
Annual Impact on Operating Budget: (Will we have an additional reoccurring operating cost?)
No impact to the operating budget.
82
83
2027 CAPITAL IMPROVEMENT/EQUIPMENT PROGRAM (CIP/CEP)
2027 City of Oak Creek Annual Budget
Department:
Water & Sewer Utility (Engineering)
Contact Person:
Ashley Kiepczynski, Utility Engineer
Request Title:
MMSD Drop Manhole Structure
General Description:
MMDS is installing a drop manhole structure to serve Oak Creek
Justification and Intent:
The Milwaukee Metropolitan Sewerage District (MMSD) is extending their Metropolitan Interceptor Sewer
(MIS) along S. 27th Street from W. Oakwood Road to the south county line. The sewer system will provide
gravity sewer service to the communities of Oak Creek and Franklin. An Intergovernmental Cooperation
Agreement with MMSD was approved by Common Council on December 2, 2025 for MMSD's contractor, Super
Excavators, to install a drop manhole to serve Oak Creek Properties. Under the agreement, the Utility is
responsible for 22% of the cost of the shaft and the drop manhole structure, and will be reimbursed through
special assessment.
Description of Alternatives:
N/A
Description of Disposal, if Applicable:
N/A
Impact on other Projects:
Allow future development along S. 27th Street between the south county line and W. Oakwood Road.
Cost Analysis: (Quotes, estimates, breakdown of potential cost and how you arrived here)
The construction of the drop manhole structure is $450,000 and will be reimbursed through special assessment.
Annual Impact on Operating Budget: (Will we have an additional reoccurring operating cost?)
No impact to the operating budget.
84
2027 CAPITAL IMPROVEMENT/EQUIPMENT PROGRAM (CIP/CEP)
2027 City of Oak Creek Annual Budget
Department:
Water & Sewer Utility (Engineering)
Contact Person:
Ashley Kiepczynski, Utility Engineer
Request Title:
S. 27th Street Sanitary Sewer
General Description:
Install 245 LF of 18-inch sanitary sewer main and a manhole along the east side of S. 27 th Street
Justification and Intent:
The contractor that will be installing the sanitary sewer main for the Buc-ee's development will be installing
245 LF of 18-inch RCP sanitary sewer main from the Buc-ee's development to the north side of W. Elm Road to
serve the two properties located at the NE quadrant of S. 27th Street and W. Elm Road. The City will fund the
installation of the sanitary sewer main and manhole to serve the two properties and will be reimbursed through
special assessment.
Description of Alternatives:
N/A
Description of Disposal, if Applicable:
N/A
Impact on other Projects:
Allow future development for the two parcels located within the NE Quadrant of S. 27 th Street and W. Elm Road.
Cost Analysis: (Quotes, estimates, breakdown of potential cost and how you arrived here)
The construction of the sanitary sewer main and manhole is $500,000 and will be reimbursed through special
assessment.
Annual Impact on Operating Budget: (Will we have an additional reoccurring operating cost?)
No impact to the operating budget.
85
86
2027 CAPITAL IMPROVEMENT/EQUIPMENT PROGRAM (CIP/CEP)
2027 City of Oak Creek Annual Budget
Department:
Water & Sewer Utility (Plant)
Contact Person:
Mike Robe, Plant Manager
Request Title:
Replace Hot Water Supply Pumps (3)
General Description:
Replace the hot water supply pumps in boiler room
Justification and Intent:
These pumps were installed in 2012 and the volute mounting surface is wearing away and no longer seals with the
factory gasket. Extra amounts of silicone sealant are needed to achieve leak free operation. The current pumps are
obsolete and are only supplied by Bell and Gosset to maintain the proper lay length. Price is for all 3 pumps.
Description of Alternatives:
N/A
Description of Disposal, if Applicable:
N/A
Impact on other Projects:
None
Cost Analysis: (Quotes, estimates, breakdown of potential cost and how you arrived here)
The replacement cost of the 3 pumps is $22,500.
Annual Impact on Operating Budget: (Will we have an additional reoccurring operating cost?)
No impact to the operation budget
87
2027 CAPITAL IMPROVEMENT/EQUIPMENT PROGRAM (CIP/CEP)
2027 City of Oak Creek Annual Budget
Department:
Water & Sewer Utility (Plant)
Contact Person:
Mike Robe, Plant Manager
Request Title:
Lowlift VFD Drives
General Description:
Replace the variable frequency drives at the lowlift.
Justification and Intent:
These drives were installed in 2015, new keypads installed in 2022, and have exceeded their life expectancy.
These drives are integral to our raw water pumping operation. If these drives fail, the pumps will be inoperable
until repaired. In addition to the age of the drive itself, the displays are fading and increasingly hard to read.
The current drives are discontinued and the new Yaskawa drives offer the easiest path for programming.
Description of Alternatives:
N/A
Description of Disposal, if Applicable:
N/A
Impact on other Projects:
None
Cost Analysis: (Quotes, estimates, breakdown of potential cost and how you arrived here)
The replacement cost of the lowlift VFD drives is $39,000.
Annual Impact on Operating Budget: (Will we have an additional reoccurring operating cost?)
No impact to the operation budget
88
2027 CAPITAL IMPROVEMENT/EQUIPMENT PROGRAM (CIP/CEP)
2027 City of Oak Creek Annual Budget
Department:
Water & Sewer Utility (Plant)
Contact Person:
Mike Robe, Plant Manager
Request Title:
Orchard Way High Zone Pump Isolation Valves
General Description:
Replace the isolation valves that control the high zone pumps at the Orchard Way Booster Station
Justification and Intent:
These valves are original equipment and have worn down internally and no longer hold tight. An attempt to
adjust the valves was made in 2025 without success. Without being able to isolate these pumps it is extremely
difficult to work on these pumps without shutting down the entire station.
Description of Alternatives:
N/A
Description of Disposal, if Applicable:
N/A
Impact on other Projects:
None
Cost Analysis: (Quotes, estimates, breakdown of potential cost and how you arrived here)
The replacement of the isolation valves at Orchard Way High Zone pumping is $60,000.
Annual Impact on Operating Budget: (Will we have an additional reoccurring operating cost?)
No impact to the operation budget
89
2027 CAPITAL IMPROVEMENT/EQUIPMENT PROGRAM (CIP/CEP)
2027 City of Oak Creek Annual Budget
Department:
Water & Sewer Utility (Plant)
Contact Person:
Mike Robe, Plant Manager
Request Title:
Painting Backwash Tower
General Description:
Repaint the backwash water tower at the water treatment plant
Justification and Intent:
The tower was last painted in 2009 and needs new paint and repair of a few breaches in the paint and coating.
Description of Alternatives:
N/A
Description of Disposal, if Applicable:
N/A
Impact on other Projects:
None
Cost Analysis: (Quotes, estimates, breakdown of potential cost and how you arrived here)
The painting of the backwash tower is $70,000.
Annual Impact on Operating Budget: (Will we have an additional reoccurring operating cost?)
No impact to the operation budget
90
INVOICE NUMBER DESCRIPTION DISTRIBUTIONS\AMOUNTS AMOUNT
VENDOR NAME: ABT MAILCOM
56715 PROCESSING OF TAX ROLL LETTERS 08-30-00-90302 930.76 1,329.66
09-30-00-84002 398.90
56753 PROCESSING OF BILLING-OCTOBER 2026 08-30-00-90302 520.30 743.28
09-30-00-84002 222.98
TOTAL VENDOR ABT MAILCOM 2,072.94
VENDOR NAME: ADAPTOR, INC.
73708 VALVE BOX PARTS 08-28-00-67302 1,092.84 1,092.84
TOTAL VENDOR ADAPTOR, INC. 1,092.84
VENDOR NAME: ADVANCE LANDSCAPE CE
1029 RESTORATION 08-28-00-67302 406.93 406.93
TOTAL VENDOR ADVANCE LANDSCAPE CE 406.93
VENDOR NAME: ALSCO
IMIL2259600 RUG/MOP SERVICE 08-28-00-66202 47.87 59.84
09-29-00-82702 11.97
IMIL2254384 RUG/MOP SERVICE 08-28-00-66202 54.29 67.86
09-29-00-82702 13.57
IMIL2256128 RUG/COVERALL SERVICE 08-28-00-66202 138.59 173.24
09-29-00-82702 34.65
IMIL2256128-CRD RUG/COVERALL SERVICE-CREDIT 08-28-00-66202 (90.72) (113.40)
09-29-00-82702 (22.68)
IMIL2257857 RUG/MOP SERVICE 08-28-00-66202 54.29 67.86
09-29-00-82702 13.57
IMIL2257861 RUG/MOP SERVICE 08-26-00-62602 80.00 160.00
08-27-00-64302 80.00
IMIL2254389 RUG/MOP SERVICE 08-26-00-62602 80.00 160.00
92
08-27-00-64302 80.00
TOTAL VENDOR ALSCO 575.40
VENDOR NAME: AMAZON
2026-11-MR COPY PAPER 08-31-00-92102 49.99 49.99
2026-11-MR BATTERIES, SEALANT 08-26-00-62602 24.29 48.58
08-27-00-64302 24.29
2026-11-MR FIRST AID SUPPLIES 08-26-00-62602 2.72 5.44
08-27-00-64302 2.72
2026-11-MR EAR PROTECTION FOR REQUIRED HARD HELMETS 08-26-00-62602 80.25 160.50
08-27-00-64302 80.25
2026-11-MR HAND TOWELS, CLEANING SUPPLIES 08-26-00-62602 59.40 118.79
08-27-00-64302 59.39
2026-11-MR LATEX GLOVES 08-26-00-62602 12.37 24.73
08-27-00-64302 12.36
2026-11-MR 100ML VOLUMETRIC PIPETTE 08-27-00-64202 12.22 12.22
2026-11-DN POWER CORDS 08-31-00-92102 8.11 11.58
09-31-00-85102 3.47
2026-11-MR LAB SUPPLIES, MISCELLANEOUS SUPPLIES 08-27-00-64202 198.95 250.95
08-26-00-62602 26.00
08-27-00-64302 26.00
2026-11-MR SANDPAPER 08-26-00-62602 31.14 62.28
08-27-00-64302 31.14
2026-11-MR PAINTERS TAPE 08-26-00-62602 12.35 24.69
08-27-00-64302 12.34
2026-11-MR GREASE GUN 08-26-00-62602 19.99 39.98
08-27-00-64302 19.99
2026-11-MR VOLTAGE MULTIMETER 08-26-00-62602 72.04 144.08
08-27-00-64302 72.04
2026-11-MR WATER FILTER 08-26-00-62602 16.28 32.56
08-27-00-64302 16.28
93
2026-11-MR AIR FILTER 08-26-00-62602 42.74 85.48
08-27-00-64302 42.74
2026-11-MR FURNACE FILTERS 08-26-00-62602 49.92 99.83
08-27-00-64302 49.91
2026-11-DN COMPUTER MOUSE, BARCODE SCANNER 08-31-00-92102 63.73 91.04
09-31-00-85102 27.31
2026-11-MR TONER 08-31-00-92102 266.77 266.77
2026-11-DA SAFETY GLOVES 08-28-00-66202 46.57 66.53
09-29-00-82702 19.96
2026-11-DA SHOP TOOLS 08-28-00-66202 111.44 159.20
09-29-00-82702 47.76
TOTAL VENDOR AMAZON 1,755.22
VENDOR NAME: AMERICAN WATERWORKS
SO322571 MEMBERSHIP 1/1-12/31/27 08-31-00-93002 2,847.00 2,847.00
TOTAL VENDOR AMERICAN WATERWORKS 2,847.00
VENDOR NAME: BADGER METER MANUFAC
80256445 BEACON MOBILE HOSTING-OCTOBER 2026 08-31-00-92302 476.72 681.03
09-31-00-85202 204.31
80253087 PRESSURE DATA LOGGER SUBSCRIPTION THRU AUGUST 2027 08-31-00-92302 420.00 600.00
09-31-00-85202 180.00
TOTAL VENDOR BADGER METER MANUFAC 1,281.03
VENDOR NAME: BATTERIES PLUS, LLC
P95522576 BATTERIES-TOWER UPS 08-28-00-66102 93.51 93.51
TOTAL VENDOR BATTERIES PLUS, LLC 93.51
VENDOR NAME: BEST WESTERN
2026-11-MR REFUND SALES TAX-WIAWWA EXPENSES 08-31-00-92602 (44.27) (63.24)
09-31-00-85402 (18.97)
94
2026-11-MR REFUND SALES TAX-WIAWWA EXPENSES 08-31-00-92602 (22.13) (31.62)
09-31-00-85402 (9.49)
TOTAL VENDOR BEST WESTERN (94.86)
VENDOR NAME: BOARDMAN & CLARK
324652 WHOLESALE CONTRACT WORK 08-31-00-92302 1,221.00 1,221.00
TOTAL VENDOR BOARDMAN & CLARK 1,221.00
VENDOR NAME: CDM SMITH
90274852 GENERAL SERVICES 08-31-00-92302 3,565.00 3,565.00
TOTAL VENDOR CDM SMITH 3,565.00
VENDOR NAME: CH2M
C9X43301-022 UNDERGROUND FACILITIES REHAB 08-01-00-22118 165,508.44 165,508.44
TOTAL VENDOR CH2M 165,508.44
VENDOR NAME: CORE & MAIN LP
Z735664 LOW LIFT FIBER LINE LOCATOR 08-28-00-66202 157.34 224.77
09-29-00-82702 67.43
TOTAL VENDOR CORE & MAIN LP 224.77
VENDOR NAME: DIGGER'S HOT LINE
261061601 DIGGERS HOTLINE TICKETS-OCTOBER 2026 08-28-00-66222 258.52 1,034.10
08-33-00-41622 517.05
09-29-00-82022 258.53
TOTAL VENDOR DIGGER'S HOT LINE 1,034.10
VENDOR NAME: DOORMASTER GARAGE DO
39409 MAIN GARAGE DOOR EXIT REPAIR 08-28-00-67802 2,567.95 3,668.50
09-31-00-83402 1,100.55
TOTAL VENDOR DOORMASTER GARAGE DO 3,668.50
95
VENDOR NAME: E2E
2026-11-BJ REMOTE STATION RADIO REPLACEMENT-CIP 23115 08-01-00-23115 203.27 290.38
09-01-00-23115 87.11
TOTAL VENDOR E2E 290.38
VENDOR NAME: EJ EQUIPMENT, INC.
P23694 SEWER CAMERA WHEEL SPACERS 09-29-00-82702 333.82 333.82
P56053 CAMERA REPAIR 09-29-00-82702 28.81 28.81
TOTAL VENDOR EJ EQUIPMENT, INC. 362.63
VENDOR NAME: ENTERPRISE RENTAL CAR
2026-11-DA WEFTEC EXPENSES 08-31-00-92602 227.77 325.38
09-31-00-85402 97.61
TOTAL VENDOR ENTERPRISE RENTAL CAR 325.38
VENDOR NAME: FARM & FLEET
2026-11-MR HAMMER DRILL, LITHIUM BATTERY 08-26-00-62602 114.50 229.00
08-27-00-64302 114.50
TOTAL VENDOR FARM & FLEET 229.00
VENDOR NAME: FASTPARK MKE
2026-11-BJ WEFTEC PARKING 08-31-00-92602 38.53 55.04
09-31-00-85402 16.51
2026-11-DA WEFTEC PARKING 08-31-00-92602 32.75 46.78
09-31-00-85402 14.03
TOTAL VENDOR FASTPARK MKE 101.82
VENDOR NAME: FERGUSON WATERWORKS
484138 2026 METER EXCHANGE PROGRAM-CIP 26104 (WE ENERGIES) 08-01-00-26104 14,775.00 14,775.00
484138-1 METER ENDPOINT 08-00-00-34600 170.00 170.00
96
TOTAL VENDOR FERGUSON WATERWORKS 14,945.00
VENDOR NAME: GFL ENVIRONMENTAL
U80000517549 PLANT DUMPSTER-NOVEMBER 2026 08-31-00-92302 96.86 96.86
U80000515903 PLANT DUMPSTER-CARBON BAG REMOVAL 08-31-00-92302 766.30 766.30
TOTAL VENDOR GFL ENVIRONMENTAL 863.16
VENDOR NAME: GOLDEN CORRAL
2026-11-DA WWOA EXPENSES 08-31-00-92602 20.66 29.52
09-31-00-85402 8.86
TOTAL VENDOR GOLDEN CORRAL 29.52
VENDOR NAME: GRAINGER
9122720775 RUST REMOVER 08-26-00-62602 146.28 292.55
08-27-00-64302 146.27
9119441377 CFE-EAST SAMPLE PUMP REPLACEMENT 08-27-00-65202 1,856.97 1,856.97
9112053518 WATER LATERAL TOOLS 08-28-00-67502 135.10 135.10
9106302434 RAW WATER SAMPLE PUMP 08-27-00-65202 2,013.53 2,013.53
TOTAL VENDOR GRAINGER 4,298.15
VENDOR NAME: GREEN BAY
2026-11-DA WWOA EXPENSES 08-31-00-92602 27.12 38.75
09-31-00-85402 11.63
TOTAL VENDOR GREEN BAY 38.75
VENDOR NAME: HOH WATER TECHNOLOGY
739178 BOILER SUPPLIES 08-26-00-63102 262.76 525.52
08-27-00-65102 262.76
TOTAL VENDOR HOH WATER TECHNOLOGY 525.52
VENDOR NAME: HOTEL NORTHLAND
97
2026-11-DA WWOA EXPENSES-PIER 08-31-00-92602 375.90 537.00
09-31-00-85402 161.10
2026-11-DA WWOA EXPENSES-POULTER 08-31-00-92602 375.90 537.00
09-31-00-85402 161.10
2026-11-DA WWOA EXPENSES 08-31-00-92602 32.26 46.09
09-31-00-85402 13.83
2026-11-DA WWOA EXPENSES 08-31-00-92602 32.26 46.09
09-31-00-85402 13.83
TOTAL VENDOR HOTEL NORTHLAND 1,166.18
VENDOR NAME: HYDRITE
2026000070802 CHLORINE-PLANT USE 08-00-00-15400 7,035.60 7,035.60
TOTAL VENDOR HYDRITE 7,035.60
VENDOR NAME: INDELCO PLASTIC CORP
INV0652714 PVC SUPPLIES 08-26-00-62602 60.39 120.78
08-27-00-64302 60.39
TOTAL VENDOR INDELCO PLASTIC CORP 120.78
VENDOR NAME: KWIK TRIP EXTENDED N
NP71319267 TRUCK FLEET GAS 08-34-00-93302 2,987.62 2,987.62
TOTAL VENDOR KWIK TRIP EXTENDED N 2,987.62
VENDOR NAME: LINCOLN CONTRACTORS SUPPLY
K17159 CONCRETE TOOLS 08-28-00-66202 90.99 129.99
09-29-00-82702 39.00
K16329 4" TRASH PUMP HOSE PART-26107 CIP 08-01-00-26107 60.13 80.17
09-01-00-26107 20.04
TOTAL VENDOR LINCOLN CONTRACTORS SUPPLY 210.16
VENDOR NAME: LYFT
98
2026-11-DA WEFTEC EXPENSES 08-31-00-92602 39.90 57.00
09-31-00-85402 17.10
TOTAL VENDOR LYFT 57.00
VENDOR NAME: M.E. SIMPSON CO., INC.
47177 LARGE DIP PIPELINE CONDITION ASSESSMENT-CIP 26119 08-01-00-26119 113,520.00 113,520.00
TOTAL VENDOR M.E. SIMPSON CO., INC. 113,520.00
VENDOR NAME: MAUGHAN, RYAN
2026-10 JURY DUTY TRANSPORTATION REIMB 08-34-00-91402 9.00 9.00
TOTAL VENDOR MAUGHAN, RYAN 9.00
VENDOR NAME: MCMASTER-CARR
74449963 LOWER KATHABAR PARTS 08-26-00-63302 38.83 71.65
08-27-00-65202 32.82
73433366 WATER LINE CONNECTORS 08-26-00-62602 44.75 89.50
08-27-00-64302 44.75
73468602 CHEMTRAC INSTALL 08-27-00-65202 113.28 113.28
73470256 WATER LINE CONNECTORS 08-26-00-62602 21.01 42.01
08-27-00-64302 21.00
73650646 CREDIT-CHEMTRAC INSTALL 08-27-00-65202 (113.28) (113.28)
TOTAL VENDOR MCMASTER-CARR 203.16
VENDOR NAME: MEDIVAN, INC.
26760 HEARING & FIT TESTS 08-31-00-92302 605.50 865.00
09-31-00-85202 259.50
TOTAL VENDOR MEDIVAN, INC. 865.00
VENDOR NAME: MENARDS
2026-23549 METER SUPPLIES 08-00-00-34600 54.52 54.52
2026-23377 SHOP SUPPLIES 08-28-00-66202 494.02 705.74
99
09-29-00-82702 211.72
2026-23051 MISCELLANEOUS SUPPLIES-ANALYZER PROJECT 08-26-00-62602 20.31 40.61
08-27-00-64302 20.30
2026-23186 SHOP SUPPLIES 08-28-00-66202 27.94 39.92
09-29-00-82702 11.98
2026-23103 TURBIDITY SAMPLE PUMP 08-27-00-65202 59.69 59.69
2026-22168 PARTICLE COUNTER INSTALL 08-27-00-65202 28.03 28.03
TOTAL VENDOR MENARDS 928.51
VENDOR NAME: MILWAUKEE BURGER CO.
2026-11-DA WWOA EXPENSES 08-31-00-92602 31.58 45.11
09-31-00-85402 13.53
TOTAL VENDOR MILWAUKEE BURGER CO. 45.11
VENDOR NAME: MILWAUKEE METRO. SEW
1003824 METRO BILL 09-25-00-82502 59,702.41 59,702.41
TOTAL VENDOR MILWAUKEE METRO. SEW 59,702.41
VENDOR NAME: NORTHERN LAKE SERVIC
2619599 WATER TESTS-AMMONIA 08-27-00-64202 23.80 23.80
2618987 WATER TESTS-QUARTERLY DBP'S 08-27-00-64202 569.34 569.34
2618371 WATER TESTS-NON CONTACT COOLING WATER 08-27-00-64202 74.54 74.54
2618415 WATER TESTS-PFAS 08-27-00-64202 275.00 275.00
2619680 WATER TESTS-MONTHLY TOCS 08-27-00-64202 101.72 101.72
TOTAL VENDOR NORTHERN LAKE SERVIC 1,044.40
VENDOR NAME: OAK CREEK WATER & SEWER UTILITY
2026-11 UTILITY'S METRO BILL 08-27-00-64202 13,873.51 13,873.51
TOTAL VENDOR OAK CREEK WATER & SEWER UTILITY 13,873.51
VENDOR NAME: PARKING MANAGEMENT SERVICES
100
2026-11-DA WEFTEC EXPENSES 08-31-00-92602 8.29 11.84
09-31-00-85402 3.55
TOTAL VENDOR PARKING MANAGEMENT SERVICES 11.84
VENDOR NAME: PARKING.COM
2026-11-DA WEFTEC EXPENSES 08-31-00-92602 4.72 6.75
09-31-00-85402 2.03
TOTAL VENDOR PARKING.COM 6.75
VENDOR NAME: PAYMENT SERVICES NETWORK INC
331789 PSN MONTHLY CHARGES-OCTOBER 2026 08-31-00-93002 146.51 209.30
09-31-00-85602 62.79
TOTAL VENDOR PAYMENT SERVICES NETWORK INC 209.30
VENDOR NAME: PREMIUM WATERS, INC.
363547909 DISTILLED WATER-PLANT 08-27-00-64202 37.96 37.96
TOTAL VENDOR PREMIUM WATERS, INC. 37.96
VENDOR NAME: PROFESSIONAL SERVICE INDUSTRIES
INV01050566 ABANDONING WATER MONITORING WELLS AT WTP 08-27-00-64202 1,125.00 2,250.00
08-27-00-64302 1,125.00
TOTAL VENDOR PROFESSIONAL SERVICE INDUSTRIES 2,250.00
VENDOR NAME: R.A. SMITH NATIONAL
198891 LUCY MEADOWS SANITARY SEWER 09-01-00-24054 800.00 800.00
198892 CREEK TWO 08-01-00-22058 8,984.00 8,984.00
TOTAL VENDOR R.A. SMITH NATIONAL 9,784.00
VENDOR NAME: RIVCRETE READY MIX LLC
629286 RESTORATION 08-28-00-67302 1,094.00 1,094.00
TOTAL VENDOR RIVCRETE READY MIX LLC 1,094.00
101
VENDOR NAME: ROBE, MICHAEL
2026-10 UTILITY ISSUED CLOTHING 08-31-00-92602 157.54 157.54
TOTAL VENDOR ROBE, MICHAEL 157.54
VENDOR NAME: RYAN ROAD MOBILE
2026-11-MR ICE 08-27-00-64202 11.98 11.98
TOTAL VENDOR RYAN ROAD MOBILE 11.98
VENDOR NAME: SHERWIN INDUSTRIES
SC056288 ASPHALT REPAIR 08-28-00-67302 522.58 522.58
TOTAL VENDOR SHERWIN INDUSTRIES 522.58
VENDOR NAME: STEVEN REMBALSKI
2026-10 CUSTOMER REIMBURSEMENT 08-00-00-46110 17,300.00 17,300.00
TOTAL VENDOR STEVEN REMBALSKI 17,300.00
VENDOR NAME: STRAND ASSOCIATES
244550 CELL TOWER REVIEW 08-31-00-92302 1,046.04 1,046.04
TOTAL VENDOR STRAND ASSOCIATES 1,046.04
VENDOR NAME: SUPERIOR CHEMICAL LLC
452165 HAND SOAP 08-26-00-62602 115.10 230.20
08-27-00-64302 115.10
TOTAL VENDOR SUPERIOR CHEMICAL LLC 230.20
VENDOR NAME: SUPERIOR LIFTING SPECIALISTS, INC
38745 TRENCH BOX LIFTING SUPPLIES 08-28-00-66202 1,950.25 2,786.07
09-29-00-82702 835.82
TOTAL VENDOR SUPERIOR LIFTING SPECIALISTS, INC 2,786.07
102
VENDOR NAME: T-MOBILE
2026-11-NB PHONE/INTERNET CHARGES 08-31-00-92102 47.16 67.37
09-31-00-85102 20.21
TOTAL VENDOR T-MOBILE 67.37
VENDOR NAME: UBER
2026-11-BJ WEFTEC EXPENSES 08-31-00-92602 9.78 13.97
09-31-00-85402 4.19
2026-11-BJ WEFTEC EXPENSES 08-31-00-92602 11.18 15.97
09-31-00-85402 4.79
TOTAL VENDOR UBER 29.94
VENDOR NAME: USA BLUE BOOK
INV01187391 LAB SUPPLIES 08-27-00-64202 67.44 67.44
TOTAL VENDOR USA BLUE BOOK 67.44
VENDOR NAME: VIRGIL HAMMON III
2026-10 CUSTOMER REIMB 08-00-00-46110 1,292.32 1,292.32
TOTAL VENDOR VIRGIL HAMMON III 1,292.32
VENDOR NAME: WE ENERGIES
2026.11.05-E GAS/ELECTRIC BILLS 08-26-00-62302 6,221.43 7,953.52
08-26-00-62602 27.94
08-28-00-66102 28.50
08-28-00-66502 376.20
08-31-00-92102 376.20
09-26-00-82102 170.85
09-29-00-82702 376.20
09-31-00-85102 376.20
2026.11.20-G GAS/ELECTRIC BILLS 08-26-00-62602 671.25 1,600.75
08-27-00-64302 804.78
103
08-28-00-66502 31.18
08-31-00-92102 31.18
09-29-00-82702 31.18
09-31-00-85102 31.18
TOTAL VENDOR WE ENERGIES 9,554.27
VENDOR NAME: WI DEPT OF NATURAL R
2026-11-MR LICENSE RENEWAL-ANAYA 08-31-00-92602 45.90 45.90
TOTAL VENDOR WI DEPT OF NATURAL R 45.90
VENDOR NAME: WIAWWA
2026-11-NB 2026 FINANCE WEBINAR 08-31-00-92602 66.50 95.00
09-31-00-85402 28.50
TOTAL VENDOR WIAWWA 95.00
VENDOR NAME: WILLIAM/REID
116431 WATER QUALITY MONITORS-CIP 26117 08-01-00-26117 126,465.00 126,465.00
TOTAL VENDOR WILLIAM/REID 126,465.00
GRAND TOTAL: 582,095.07
104
ENGINEERING/INSPECTION- Matthew Sullivan
Key Highlights:
Development activity remains active, with continued progress on the OCFSD
Natatorium, Buc-ee’s, B1 Building, Derse, and Oaks at 8100 projects;
Several subdivision developments are reaching key milestones, including completed
public infrastructure at Millwood Glen, anticipated November completion of Lucy
Meadow infrastructure, and an anticipated November construction start for Garden
Medley following approval of its development agreement;
City infrastructure and capital projects continue to advance, with the 2026 Road
Improvement Projects substantially complete, Costco-related improvements along S.
27th Street and at I-94/Drexel Avenue anticipated to be completed in November, and
design underway for the Civic Center Administrative Services Area Build-Out.
Developer Project Updates
Active Construction:
Ramp improvements at IH 41 required for Costco and The Prairie continue to be on
schedule with substantial completion date of November 20;
The OCFSD Natatorium, Buc-ee’s, and B1 Building (Drexel and Main Street) projects
continue to move forward;
Oaks at 8100 has begun final public infrastructure work and anticipates completing in
November;
Millwood Glen Subdivision construction is completed, and their first building permit
will be issued in November;
Lucy Meadow public infrastructure construction anticipated completion in November;
Hey Day Phase II, has been delayed with developers- re-evaluating feasibility in
Spring. Demo of homes on Puetz will still take place.
Garden Medley (Milwaukee County) Development Agreement has been approved, and
construction is anticipated to begin in November.
Engineering Department Updates
Design Projects:
North Bluff Stabilization and Lake Vista North Park Improvements are progressing;
2027 Road Improvement Projects alternatives will be discussed with BOPWACA and
Common Council in November;
Keuny Architects have begun designing the Administrative Services Area Build-Out in
the Civic Center.
105
Construction Projects:
2026 Road Improvement Projects are substantially completed with punch list items
remaining;
Improvements along S. 27th Street and I94/Drexel Avenue Interstate for Costco are
scheduled to be completed in November;
MMSD’s Oak Creek Southwest MIS Extension continues to progress;
We Energies’ LNG Turbine project continues to progress;
Fire Station #3 Sprinkler System Rehabilitation will begin this November.
PUBLIC WORKS — Kevin Archambeau (Interim Director)
Streets Division will continue patching potholes and finishing up roadside mowing for
the year. The sweeper will be out daily; plow routes will be checked for road surface
obstructions and be repaired with tar or manhole protection rings. The DTS holiday
tree will be harvested in the third week of November and City-wide holiday
decorations will be installed. The Department will attend the annual winter
plow/maintenance training event to be held at the Public Works building. The Division
will also be preparing plow equipment, installing spreaders, calibrating the brine and
salt systems, and installing snow fence where needed;
Parks staff will switch summer equipment to winter equipment marking all plow areas,
add infield mix to the ball diamonds, aerating sports fields, trimming park trees, and
conducting routine maintenance on building rentals;
The Forestry crew will be closing out Fall tree planting and bucket pruning. DTS will
continue with Fall cut back along with bushes, shrubs, and flowers in City areas;
Fleet staff will be winterizing mower equipment, servicing the new med unit and fire
engine, and finish prepping snow equipment for winter;
The Street Light Maintenance Division will continue replacing HPS light fixtures with
LED and repairing/replacing knocked down light poles. Additionally, the Division will be
inspecting manholes and pole bases for any damaged wires to be replaced to prevent
future failures;
The Sign Shop will begin decorating for the holidays at DTS and assisting with
November 3 elections;
No special events in November.
106
WATER & SEWER UTILITY — Brian Johnston
Underground Facilities Rehabilitation Project (UFR): C.D. Smith continues work on
the UFR project. Michels has mobilized to the site and successfully completed test-pile
installation for the chlorine contact tank (CCT). Importantly, the testing did not
increase turbidity in the existing CCT. Staff installed a mobile turbidity meter in the
tank to monitor any effects from pile driving, and test-pile conditions will continue to
be observed for the next two weeks. The project shoring plan is being finalized; once
approved, crews will begin shoring activities before excavation. Staff also continue to
develop emergency-response procedures and project contingency plans;
Neptune Meter Replacement Program: Distribution staff continue performing meter
exchanges, with 306 of 9,674 meters replaced to-date. Staff also worked with the
MPR team to document an in-home meter exchange for a future program story. Thank
you to Taryn Knezevic and Nicole Butler for allowing staff to use their homes for this
effort. At the current planned pace, the City-wide meter replacement program is
expected to take approximately six to seven years to complete;
Chemtrac Analyzer Installation: Treatment plant staff completed installation of new
Chemtrac analyzers in the treatment plant laboratory. The analyzers will provide
continuous monitoring of UV254, pH, temperature, dissolved oxygen, free chlorine,
and particle count for raw water and tap water sampling. UV254 is new to the
treatment plant to monitor the dissolved organic carbon, natural organic matter, and
disinfection byproduct precursors in real time. It will also monitor the UV absorption in
the water in the near future. They will also monitor free chlorine, pH, and temperature
in filter effluent, settled effluent east, and settled effluent west. Staff coordinated with
the Chemtrac team to complete final analyzer connections. Jacobs also assisted with
integrating the new instruments into the SCADA system so data can be recorded and
trended. A separate analyzer was installed at the Orchard Way Reservoir to monitor
UV254, pH, temperature, and free chlorine. This was a substantially larger and more
complex project than initially anticipated. To maintain continuous monitoring during
installation, the existing monitors had to be removed from the laboratory wall and
placed on a temporary stand. Staff also removed two laboratory bookcases to create
the space needed for the new analyzer equipment.
107
ADMINISTRATIVE OPERATIONS
October 2026
Workload:
Other administrative tasks included the following:
Added 0 customer accounts for the month.
Billed 963 water customers and 986 sewer customers.
Gallons Billed (in thousands):
YTD YTD YTD YTD YTD
2026 2025 2024 2023 2022 Average
Residential 351,197 333,282 330,369 355,571 341,934 342,471
Commercial 481,412 456,207 443,401 448,237 422,193 450,290
Industrial 408,221 435,863 609,047 566,214 519,602 507,789
Public Authority 11,359 10,351 10,821 15,180 13,942 12,331
Wholesale 1,249,153 1,220,877 1,202,165 1,248,327 1,150,080 1,214,120
Total 2,501,342 2,456,580 2,595,803 2,633,529 2,447,751 2,527,001
% Change to Prior Year 1.8% -5.4% -1.4% 7.6% N/A
% Change to Average -1.0% -2.8% 2.7% 4.2% -3.1%
New Customers:
YTD YTD YTD YTD YTD
2026 2025 2024 2023 2022 Average
Residential 20 4 30 58 24 27.2
Commercial 7 5 29 13 13 13.4
Industrial 0 0 0 0 0 -
Public Authority 0 0 1 0 0 0.2
Wholesale 0 0 0 0 0 -
Total 27 9 60 71 37 40.8
108
ENGINEERING OPERATIONS
October 2026
HVAC Replacement at WTP
Southport is continuing to address punch list items.
Underground Facilities Rehab at WTP
Test piles were successfully completed for the chlorine contact tank (CCT) in October. Production pile
driving for the CCT is anticipated to begin and continue through November.
E. Marquette Avenue Water Relay
The design of the E. Marquette Ave. and S. Lenox Ave. water relay project was completed in October.
The plans will be advertised November 4th with a bid opening on November 20th. The work will be
completed in advance of the 2027 Road Improvement Project.
E. Lakeview Drive and S. Mona Court Water Relay
Water main installation along E. Lakeview Drive and S. Mona Court was completed in August and final
adjustments were completed in October. Final payment to Zignego is anticipated in November.
Ryan Road & Howell Avenue Lateral Relay
Engineering is working with raSmith on the design of the project. Plans were sent to WisDOT, MCTS,
and Utilities for their review in October. The project is anticipated to be bid in January with
construction completed prior to WisDOT’s road improvement project in 2027.
Air Release Replacements & Hydrant Relocation
The preconstruction meeting was held for the project in October. UPI is anticipated to begin
construction in November.
Developer Projects
Oaks at 8100 – Punch list items remain.
Lucy Meadows – Punchlist items remain.
Almeg – DNR and MMSD approvals, developer to schedule an additional preconstruction
meeting since there will likely be a new contractor.
Buc-ee’s –MMSD and WDNR approvals, waiting for WisDOT permit.
The Prairie – Ongoing coordination with developer on design.
Millwood Glen Phase 1– Punch list items remain.
Millwood Glen Phase 2 – Sanitary sewer main and water main plans were submitted by
developer in September.
Garden Medley Estates – Water main plans were sent to WDNR in August and sanitary sewer
plans were sent to MMSD in September.
Hey Day Phase 2 –Water main construction is on hold along with construction of the
development.
Creek Two – Water main construction was completed in September. Punch list items remain.
109
DISTRIBUTION & COLLECTION OPERATIONS
October 2026
Water Main Breaks:
On October 28 th, we repaired a main break on W. Marquette Ave. right before 6 th St. The leak
was next to a valve so we were preparing to replace the valve. This required coordination with
nearby businesses. We ended up not having to take the businesses out of water to make the
repair.
Water Lateral Repairs:
On October 29th, we excavated to find a missing curb stop for 185 W. Rainbow Ridge. We ended
up finding it further down the main from where we thought. This was needed to perform
maintenance inside the building. There are several more to find in Springbrook Cercle that were
damaged after installation.
Hydrant Repairs/Maintenance:
Semi-annual and quarterly dead-end hydrants were flushed. We also did the remaining annual
hydrants that were within construction zones.
Valve Repairs:
No valves were repaired in the month of October.
Sewer Repairs/Maintenance:
Workers continued with sewer cleaning and televising.
Miscellaneous:
We have extended an offer to fill the vacant Utility Service Worker position. The new employee
is scheduled to start on November 17th.
Utility Workers Pier and Poulter attended the WWOA Conference in Green Bay.
Out of Service:
There are currently eight fire hydrants out of service in need of repair. There are currently 38
valves jammed open in need of repair.
110
JOB DESCRIPTION JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTALS GOALS
Meters
Meter Exchanges 5 41 7 1 28 9 40 7 135 144 417 600
Cross Connection Inspections 5 7 4 1 3 2 5 9 133 145 314 300
Non-Residential Inspections 9 12 36 92 37 15 39 13 48 70 371 375
Water
Annual Hydrant Flushing - - - 82 - - 1,904 202 - 60 2,248 2,150
Semi-annual Flushing 6 - - 100 - - 7 - 105 218 2x104 (208)
Quarterly Flushing 54 - - 55 - - 54 3 - 60 226 4x57 (228)
Flush Emergency Connections - - - - Due - - - - - - 3
Watermain Crossings 72 - - - - - - - - - 72 72
Operate Valves - - - - 124 516 151 208 - - 999 1,000
Hydrant Painting - - - - - 255 14 - 73 - 342 150
Cathodic Protection Tests - - - - - - - - - - - 11
Check Remote Water Mains - - - - - - - - - - - 40
Sewer
Clean Sewers 31,025 43,883 25,134 1,307 7,235 2,100 - 16,206 10,579 14,345 151,814 151,229
Camera Sewers - 8,161 18,610 6,119 7,885 6,011 - 7,627 8,304 2,828 65,545 55,929
Check Problem Sewers 2 2 121 - - 132 8 - 31 124 420 492
Check Remote Sewer Mains - - - - - - - - - - - 51
Admin
Tier II Report Done 1/0/1900
MMSD Annual CMOM Report 1/0/1900 DONE
DNR eCMAR DONE
DNR River Crossing Stations DONE
Cross Connection Survey Done
Revised 1/4/21 JF T:\Distribution Goals.xlsx
DISTRIBUTION GOALS 2026
111
PLANT OPERATIONS
October 2026
PUMPAGE REPORT 2026 2025 % Change 5 Year %
Monthly Pumpage 249,610,000 248,590,000 +0.4 -3.1
Monthly Average Day 8,051,935 8,019,032 +0.4 -3.7
Monthly Peak Day (10/18)9,460,000 (10/1)10,480,000 -9.7 -19.2
Yearly Pumpage 2,626,710,000 2,567,190,000 +2.3 +0.8
Yearly Average Day 8,640,493 8,454,967 +2.2 +0.9
Yearly Peak Day (7/15)13,970,000 (6/23)12,380,000 +12.8 +3.9
West Zone Pumpage 112,980,000 115,610,000 -2.3 +4.0
West Zone Yearly Total 1,202,320,000 1,168,250,000 +2.9 +4.8
WATER QUALITY REPORT Raw Water Finished Water
Average Free Chlorine 1.58 mg/l
Total Chlorine 1.77 mg/l
Average Alkalinity 109.9 mg/l 110.9 mg/l
Average pH 8.29 8.14
Average Fluoride 0.15 mg/l 0.77 mg/l
Average Turbidity 1.47 NTU 0.04 NTU
High Temperature High 63.9 F Low 54.0 F
Hardness 154 mg/l 154 mg/l
Preventative Maintenance Tasks: Staff completed 167 preventative maintenance tasks and 2
safety sessions during the month.
Work Orders: Staff completed 11 work orders during the month. Some of the tasks include
installing a temporary sample line from the combined filter effluent line, cleaning filter walls,
commissioning of new lab analyzers, and replacing flush valve in men’s room.
Plant: Operators worked closely with Chemtrac factory reps and the computer programmer to get
the new lab analyzers operational. CIVMIC was onsite to provide safety training for all operators.
112
2001
1553
1 501 1001 1501 2001
Tasks
Preventative Maintenance
Completed
Yearly
24
20
18 19 20 21 22 23 24 25
Tasks
Safety
Completed
Yearly
113
Source: City of Oak Creek website. First collected Nov 9, 2026.