RecordWell Data

Meeting Agenda and Packet

Village of Whitefish Bay · Milwaukee County · meeting of Nov 9, 2026 · Agenda packets

Open the original document More from Village of Whitefish Bay

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Village of Whitefish Bay, Wisconsin Public Works Committee Meeting Agenda Monday, November 9, 2026 at 5:30 pm In Person Meeting - Village Hall - 2nd Floor Board Room As an alternative to attending in-person, the public may access this meeting of the Public Works Committee by phone or by computer. Please note that those participating remotely will not have an opportunity to provide public comment. The phone number is: +1 312 626 6799. The Zoom Meeting code is: 832 7883 7748 and the Passcode is: 784164. https://us06web.zoom.us/j/83278837748?pwd=ZFFCS1Mza2Qvd09VaHkzOFBpWVgwUT09 AGENDA 1. Call to Order 2. Review and Approve Minutes of October 12, 2026 Public Works Committee Meeting 3. Discussion/Recommendations regarding the Lake Michigan Storm Sewer Outfall Remediation Project Design 4. Discussion/Updates regarding the MMSD Private Property Inflow and Infiltration & LSL Replacement Project 5. Discussion/Approval regarding the 2028 Watermain and Lead Service Line Replacement Program 6. Department Status Report and Project Updates (See attached packet) Cc: Village Board, Village Manager, Public Works Superintendent, Department Heads, Village Attorney Posted: 11/6/2026 Note: It is possible that members and/or possibly a quorum of members of other governmental bodies of the municipality may be in attendance at the above-stated meeting to gather information; action will not be taken by any governmental body at the above-stated meeting other than the governmental body specifically referred to above in the notice. Public Works Committee Minutes Monday, October 12, 2026, at 5:30 p.m. 1. Call to Order: Chairperson Serebin called the meeting to order at 5:30 p.m. Present: President Buckley, Trustee Haller, James Zess, Ben McGillicuddy, Chairperson Serebin Also Present: Matthew Collins – Public Works Director, Anna Christopherson – Assistant Village Manager, Maxine Miller – Staff Engineer, Patrick McCarthy – Public Works Superintendent, and Mustafa Emir, CJ Beyer and Andrew Ashley of Clark Dietz 2. Review and Approve Minutes of September 14, 2026 Public Works Committee Meeting PRESIDENT BUCKLEY MOVED TO APPROVE THE MINUTES, SECONDED BY TRUSTEE HALLER. MOTION CARRIED 5-0. 3. Discussion/Recommendation Regarding the Storm and Sanitary Sewer Improvement Study Director Collins introduced the item, noting the study arose from the 2025 southeastern Wisconsin storms, including the thousand-year storm, and follows the Village's practice of developing infrastructure roadmaps integrated into the Capital Improvement Program. Director Collins emphasized that the study was a collaborative effort across the department — engineering, wet weather response and operations, and long-term planning. CJ Beyer of Clark Dietz presented the study highlights. The modeling drew on existing XPSWMM models, Village and MMSD system data, and rainfall data, using a conservative 6-hour, 10-year design storm in lieu of the ordinance standard of a 24- hour, 10-year storm. Risk was assessed by basin using a 7-foot basement-backup assumption rather than tied to any particular historical storm. Reviewing the MMSD interceptor system, the consultants found no reason to believe the regional interceptor was a primary contributor to localized basement backups, noting MMSD data showed freeboard remaining during recent events, including the August 2025 storm of approximately eight inches. On the sanitary side, the risk map incorporates prior improvements — the Fairmont Relief Sewer, Palisades lift station, and lining and I/I programs — and identifies the center of the Village as a hot spot, consistent with 2015–2016 memos. Committee members questioned this finding based on their experience of the 2010 and 2025 storms, when the most significant backups occurred south of Hampton Avenue. The consultants explained that the assessment is uniform and math-based rather than relative: prior southern improvements have reduced risk there, elevating the central Village's relative risk, and a pipe can be hydraulically fragile even where damage has not yet occurred. Staff added that reported-backup data was too scattered to serve as an equitable basis for capital decisions, so recommendations are grounded in hydraulic flow and elevation data. The study identifies three relief sewers in the central Village — in south-to-north order, Henry Clay, Birch, and Lake View each conveying flow directly to the MMSD line, with the Henry Clay project recommended first if a single project is pursued. Similar relief sewers installed in Bayside and the City of Milwaukee have produced favorable results. Regarding interconnections and operations, of approximately 20 historically listed sanitary/storm interconnections, field verification found 14 remain active, concentrated on the north side. The study recommends installing or repairing backflow preventers where freeboard between the two systems is shallow, establishing an annual inspection and maintenance program, and addressing five or six of these as projects within the next year. The Village currently has one level sensor and one flow monitor; the study recommends an alarm at the priority risk area, flow monitoring at the second priority area, and use of the wet weather response standard operating procedure included as a report appendix, with an additional monitor to be considered in a future capital improvement. On the storm sewer side, the Village has seven basins — four draining to Lake Michigan and three to the river. Key findings include inlet sizing and spacing (inlets needed approximately every 300 feet on long blocks), non-standard gooseneck inlets to be fixed when encountered on projects, and six local low points, including the Wilshire and Beaumont areas. The Lancaster storm sewer, which was built but stopped short of its outfall at a 42-inch sanitary sewer and was partly filled with concrete, is recommended for completion with a siphon to leverage the pipe already in the ground. For the Wilshire triangle in the southeast corner — where the storm sewer runs between homes — the study presents options of an approximately $750,000 relief storm sewer or approximately $1.2 million in storm water controls at the Bartlett green space, with the relief sewer recommended first given resident attachment to the green space and concerns about the historic railroad corridor there. Committee members identified the Wilshire triangle as the Village's number one priority, citing August 2025 flooding of front yards and basements, and concluded the Village has reached a tipping point where storm drainage should be prioritized because resident impacts there now exceed those of the priority sanitary areas. Staff agreed the Village need not shift entirely but can stagger storm and sanitary projects holistically. The report's recommendations section carries cost estimates for the items above — all preliminary concepts with no design or engineering completed. Director of Public Works Director Collins outlined next steps in two parts: operational items, including wet weather SOPs ready by next season and bypass/backflow preventer work within the next year funded within existing utility budgets; and capital items, with all recommendations entering the CIP process — presentations beginning in 2027 for the 2028–29 borrowing, Village Board conversations beginning around June, design engineering in fall/winter, and construction in 2028. The Committee also discussed the report's value as a consolidated record of prior consultant work (approximately two terabytes from nearly a dozen consultants), with staff identifying GIS as the long-term repository for future boards. MR. ZESS MOVED TO RECOMMEND TO THE VILLAGE BOARD TO ACCEPT THE STORM AND SANITARY SEWER IMPROVEMENT STUDY, SECONDED BY TRUSTEE HALLER. MOTION CARRIED 5-0. 4. Department Status Report and Project Updates Director Collins reported that the contractor was rough grading Devon, with utility adjustments occurring this week; the base course and binder coat are planned for Thursday and the topcoat for Saturday, although he characterized that schedule as optimistic based on-site conditions. Several areas with compromised, soft soil still require excavation and remediation. If the contractor addresses those areas, the project could be fully paved by Saturday; more realistically, completion is expected within approximately the next eight days. 5. Adjournment PRESIDENT BUCKLEY MOVED TO ADJOURN AT 7:18 P.M., SECONDED BY TRSUTEE HALLER. MOTION PASSED 5-0. Respectfully submitted, Anna Christopherson Assistant Village Manager Village of Whitefish Bay Public Works Department 155 W. Fairmount Ave  Whitefish Bay, Wisconsin 53217  (414) 962-6690  Fax (414) 967-1391 Mathew Collins, Director of Public Works November 9, 2026 Memo to: Chairperson Serebin and Village of Whitefish Bay Public Works Committee From: Matthew Collins, Director of Public Works Re: Storm Sewer Outfall Rehabilitation Design Review On February 17, 2025, the Village Board approved the contract for Mid City Corporation to inspect three of the Lake Michigan outfalls and contiguous manholes, document existing conditions, and complete inspection reports including repair suggestions and cost estimates. In April, 2025, Mid City performed the inspections of all accessible stormwater outfalls that discharge into Lake Michigan with the exception of LM4 that has recently been rehabilitated. Mid City completed the analysis and presented their findings within a report to the Public Works Committee on October 13th, 2025. The final report guided the Village with prioritizing critical storm water utility maintenance and rehabilitation projects and capital budget planning. The Village Board adopted a 6-year Capital Improvement Plan (CIP) that includes $200,000 in the 2026 budget for storm sewer manhole lining and repairs. Some of the available CIP funds were leveraged to for the Village Board to approve engineering services to allow for professional engineering services to complete design, field survey, utility easements, environmental impacts/permits, and bid assistance for LM#1 rehabilitation as well as safety grate installations at LM#1 and LM#3. Ruekert Mielke has completed their preliminary design scope of the LM#1 outfall and the LM#3 safety grates including evaluating rehabilitation options for LM#1. Within the scope of services, Ruekert Mielke reviewed alternative techniques to rehabilitate the outfall and apron of LM#1. To date, village staff and engineers have completed the preliminary site review, met with impacted residents, and evaluated rehabilitation alternatives including construction access and costs. LM#1 rehabilitation includes the following recommendations: - Temporary and Permanent Easements - Cured-in-Place Pipe (CIPP) Lining - Geopolymer Manhole Lining - Outfall Structure Replacement Alternative rehabilitation activities may be considered including: - Klode Park Beach Stabilization (assist with construction access to the north) - CIPP Lining – Drop Manhole west to Lake Drive MCC made recommendations to install a safety grate to the LM#3 outfall to prevent unwarranted access to the outfall. Due to long- term monitoring and maintenance required to keep the grate clear of debris, accessibility would be a requirement for DPW staff to routinely access the outfall. The only way to access the LM#3 outfall is through Silver Spring Park where no formal access path exists and substantial erosion makes it difficult to traverse the site. Based on concerns with access, village staff and Ruekert Mielke recommend placing warning signage on the outfall, but not to install safety grates at this time. Village staff and Ruekert Mielke are seeking recommendations from the Public Works Committee to narrow the scope of work to LM#1 and LM#3. Once the Public Works Committee agrees on the scope of construction activities, the design team will present the final recommendations to the Village Board prior to finalizing design, easement documents, and budget estimates. It is anticipated that the final plans, specifications, and easements will be completed by late 2027 with construction planned for 2028. Final project budget estimates will be included within the 2028 – 2033 Capital Improvement Plan Storm Utility budget recommendations that will be reviewed and adopted by the Village Board in 2027. Refer to attached presentation for a complete overview of the proposed project scope and budg et estimates. Village Staff Recommends to the Public Works Committee: To recommend to the Village Board the proposed design and construction scope of the LM#1 storm sewer outfall. VILLAGE OF WHITEFISH BAY STORM SEWER REHABILITATION PROJECT UPDATE 11/9/2026 • Review recommendations from July 2025 Inspection Report • LM1 Storm Sewer Rehabilitation • Easement Acquisition • Alternative Overview & Cost Estimates • Recommended Alternative • LM3 Outfall Safety Grate • Project Schedule & Next Steps Overview Recommendations from July 2025 Inspection Report LM1 Repair/replace approximately 50-feet of 48” storm sewer tunnel immediately west of outfall structure Repair outfall structure LM1 LM3 Install safety grate at outfall structureLM3 LM1 Storm Sewer & Outfall Structure • LM1 storm sewer and outfall is located on private property north of Klode Park • Outfall structure is in failure • A drop manhole structure is located mid-yard along the property line between 5960 & 6000 N. Shore Drive • Structure is in fair to good condition • 84-feet deep • 48” storm sewer tunnel condition: • 50-feet immediately west of outfall structure is in failure • Severe deterioration • Missing sections • Radial and longitudinal cracks • Remaining pipe to mid-yard manhole is in fair condition: • Ground water infiltration • Minor cracks • Pipe from drop manhole to manhole in intersection of Lake Drive and Montclaire Avenue: • Ground water infiltration • No significant structural deficiencies noted LM1 Storm Sewer Easements • No recorded easements for the properties adjacent to the LM1 storm sewer and outfall have been located • 9/15/2026 - Letters sent to property owners of 5960 & 6000 N. Shore Drive to provide project information and request meeting to discuss proposed easements • 10/2/2026 - Met with residents to discuss project and proposed easements • Property owners expressed interest in having work completed comprehensively to minimize future risk of the storm sewer failing & impacts to the properties • Proposed easements to acquire include: • Permanent Storm Sewer Easement on 6000 N. Shore Drive • Temporary Construction Easement on 5960 N. Shore Drive • Permanent Access Easement on 5960 N. Shore Drive along the beach LM1 Storm Sewer Easements LM1 Storm Sewer Rehabilitation Alternatives Overview & Cost Estimates • Outfall Structure Replacement • Klode Park Beach Stabilization • LM1 Storm Sewer Rehabilitation Alternatives • Slipline & Open-cut replacement • Geopolymer Mortar Lining & Open-cut replacement • Hand-mined Tunnel Pipe Installation • Cured-in-Place Pipe (CIPP) Lining • Drop Manhole Rehabilitation • Geopolymer Manhole Lining • Fiberglass Insert Manhole Lining • Recommended Alternative LM1 Outfall Structure Replacement • Outfall structure is in failure and cannot be rehabilitated due to: • Degradation of concrete • Exposure of reinforcing steel • Replacement of outfall structure will largely be in kind * All estimated costs expressed in 2028 dollars Item No. Item Description Unit Quantity Unit Price Cost 1 Mobilization and Access L.S. 1 80,000$ 80,000$ 2 Remove and Replace Cast-in-Place Outfall Structure L.S. 1 108,000$ 108,000$ 3 Klode Park Path Restoration S.Y. 500 100$ 50,000$ 4 Erosion Control L.S. 1 32,500$ 32,500$ 270,500$ 68,500$ 339,000$ LM1 Outfall Structure Replacement Subtotal Engineering, Administration, Legal, & Construction Contingency (25%, Rounded) Total Estimated Rehabilitation Costs LM1 Outfall Structure Replacement • Construction access to be from Klode Park • Permanent access easement from Klode Park to outfall to be acquired from 5960 N. Shore Drive • Construction access within Klode Park proposed to include permanent beach stabilization (5:1 slope between jetties) Item No. Item Description Unit Quantity Unit Price Cost 1 Heavy Riprap TON 1400 85$ 119,000$ 2 Fine Sand TON 550 55$ 30,250$ 149,250$ 37,750$ 187,000$ Klode Park Beach Stabilization Subtotal Engineering, Administration, Legal, & Construction Contingency (25%, Rounded) Total Estimated Rehabilitation Costs LM1 Storm Sewer Rehabilitation Geopolymer Mortar Lining & Open-cut Replacement • Geopolymer mortar sprayed onto pipe to provide: • Structural support • Corrosion resistance • 3-inch-thick mortar layer would be required to provide required structural support resulting in a 42-inch Diameter pipe • Existing deficiencies in the pipe would require open-cut replacement of 50-feet immediately west of LM1 outfall structure • Pipe needs to be clean and dry to be able to apply mortar • Minimal work footprint: • Excavation at drop manhole would not be required Advantages • Minimal work footprint at drop manhole Disadvantages • Reduced hydraulic capacity of pipe • Increased efforts needed to have pipe clean and dry Item No. Item Description Unit Quantity Unit Price Cost 1 Mobilization and Access L.S. 1 80,000$ 80,000$ 2 Remove and Replace 48-inch CL V Storm Sewer L.F. 50 1,300$ 65,000$ 3 Cast-in-Place Pipe Encasement L.F. 50 850$ 42,500$ 4 Geopolymer Mortar L.F. 270 1,000$ 270,000$ 5 Temporary Bypass Pumping L.S. 1 50,000$ 50,000$ 507,500$ 127,500$ 635,000$ Subtotal Engineering, Administration, Legal, & Construction Contingency (25%, Rounded) Total Estimated Rehabilitation Costs Geopolymer Mortar Lining LM1 Storm Sewer Rehabilitation Slipline & Open-cut Replacement • Fiberglass reinforced polymer mortar (FRPM) pipe installed within the existing pipe and the annular space would be grouted • Existing deficiencies in the pipe would require open-cut replacement of 50- feet immediately west of LM1 outfall structure • Anticipated that a 41-inch Diameter pipe would need to be installed • Minimal work footprint: • Excavation at drop manhole would be required to remove casting and brick chimney section Advantages • Minimal work footprint at drop manhole Disadvantages • Reduced hydraulic capacity of pipe Item No. Item Description Unit Quantity Unit Price Cost 1 Mobilization and Access L.S. 1 80,000$ 80,000$ 2 Remove and Replace 48-inch CL V Storm Sewer L.F. 50 1,300$ 65,000$ 3 Cast-in-Place Pipe Encasement L.F. 50 850$ 42,500$ 4 41-inch FRPM Pipe (Slip Line) L.F. 270 1,600$ 432,000$ 5 Cementitious Grouting of Annular Space C.Y. 30 540$ 16,200$ 6 Temporary Bypass Pumping L.S. 1 26,500$ 26,500$ 662,200$ 165,800$ 828,000$ Engineering, Administration, Legal, & Construction Contingency (25%, Rounded) Total Estimated Rehabilitation Costs Slipline with FRPM Pipe Subtotal LM1 Storm Sewer Replacement Hand-Mined Tunneling • Full replacement of the pipe from the outfall to the drop manhole by hand- mined tunneling due to depth • A vertical shaft would need to be excavated at the drop manhole to connect the new pipe • Substantially longer construction duration compared to other alternatives Advantages • Full pipe replacement Disadvantages • Cost • Large construction footprint and disruption to properties • Construction duration Item No. Item Description Unit Quantity Unit Price Cost 1 Mobilization and Access L.S. 1 270,000$ 270,000$ 2 Hand-mining 48-inch RCP CL V Storm Sewer L.F. 270 5,900$ 1,593,000$ 3 Temporary Bypass Pumping L.S. 1 26,500$ 26,500$ 1,889,500$ 472,500$ 2,362,000$ Hand-Mined Tunnel Subtotal Engineering, Administration, Legal, & Construction Contingency (25%, Rounded) Total Estimated Rehabilitation Costs • LM1 Storm Sewer Rehabilitation Cured-in-Place Pipe (CIPP) Lining – Drop Manhole to Outfall • Liner saturated with resin is inserted, inflated, & cured within the existing pipe • 1.5-inch-thick liner would be required to provide required structural support resulting in a 45-inch Diameter pipe • 50-feet immediately west of LM1 outfall structure would not need to be replaced • Minimal work footprint: • Excavation at drop manhole would be required to remove casting and brick chimney section Advantages • Cost • Minimal work footprint at drop manhole Disadvantages • Slightly reduced hydraulic capacity Item No. Item Description Unit Quantity Unit Price Cost 1 Mobilization and Access L.S. 1 53,000$ 53,000$ 2 48-inch Storm Sewer CIPP Lining L.F. 270 1,300$ 351,000$ 3 Temporary Bypass Pumping L.S. 1 26,500$ 26,500$ 430,500$ 108,500$ 539,000$ Cured-in-Place Pipe (CIPP) Lining (Outfall to Drop Manhole) Subtotal Engineering, Administration, Legal, & Construction Contingency (25%, Rounded) Total Estimated Rehabilitation Costs LM1 Storm Sewer Rehabilitation Cured-in-Place Pipe (CIPP) Lining – Drop Manhole to Lake/Montclaire Intersection • CIPP lining from drop manhole to manhole in the Lake/Montclaire intersection • No significant structural deficiencies noted in pipe presently • Current groundwater infiltration may exacerbate future structural issues • Long-term & comprehensive solution • Economy of scale • Time value of money • Contractor is mobilized • Acquisition of temporary construction easements & restoration • Additional CIPP bid as Mandatory Alternate Item No. Item Description Unit Quantity Unit Price Cost 1 48-inch Storm Sewer CIPP Lining L.F. 720 675$ 486,000$ 486,000$ 122,000$ 608,000$ Cured-in-Place Pipe (CIPP) Lining (Drop Manhole to Lake/Montclaire Manhole) Subtotal Engineering, Administration, Legal, & Construction Contingency (25%, Rounded) Total Estimated Rehabilitation Costs LM1 Storm Sewer Drop Manhole Rehabilitation • Drop manhole is in fair to good condition • Long-term & comprehensive solution • Rehabilitation of manhole can be completed by: • Geopolymer lining • Installation of fiberglass inserts (sliplining) Item No. Item Description Unit Quantity Unit Price Cost 1 Mobilization and Access L.S. 1 10,800$ 10,800$ 2 72-inch Geopolymer Manhole Lining V.F. 90 530$ 47,700$ 3 Temporary Bypass Pumping L.S. 1 26,500$ 26,500$ 85,000$ 22,000$ 107,000$ Geopolymer Manhole Lining Subtotal Engineering, Administration, Legal, & Construction Contingency (25%, Rounded) Total Estimated Rehabilitation Costs Item No. Item Description Unit Quantity Unit Price Cost 1 Mobilization and Access L.S. 1 53,000$ 53,000$ 2 72-inch Fiberglass Insert Manhole Lining V.F. 90 970$ 87,300$ 3 Temporary Bypass Pumping L.S. 1 26,500$ 26,500$ 166,800$ 42,200$ 209,000$ Engineering, Administration, Legal, & Construction Contingency (25%, Rounded) Total Estimated Rehabilitation Costs Subtotal Fiberglass Insert Manhole Lining LM1 Storm Sewer & Outfall Recommended Alternative Item Description Cost LM1 Outfall Structure Replacement 270,500$ Klode Park Beach Stabilization 149,250$ Cured-in-Place Pipe (CIPP) Lining (Outfall to Drop Manhole) 430,500$ Cured-in-Place Pipe (CIPP) Lining (Drop Manhole to Lake/Montclaire Manhole) 486,000$ Geopolymer Manhole Lining 85,000$ Subtotal 1,421,250$ Construction Contingency (10%, Rounded) 143,500$ Engineering, Administration, Legal (15%, Rounded) 215,250$ Total Estimated Rehabilitation Costs 1,780,000$ LM1 Storm Sewer and Outfall Recommended Alternative LM3 Outfall • LM3 storm sewer outfall is located north of Silver Spring Park • LM3 Outfall structure in good condition • Wooded path present from the maintained park area east towards the outfall structure • 20-foot vertical drop in grade just above the outfall structure LM3 Outfall • Installation of a safety grate would: • Prevent persons from accessing the storm sewer • Require long-term monitoring & maintenance • Access improvements needed to install and maintain the safety grate • Current recommendation is to not install the safety grate • Warning signage may be added in the future Project Schedule & Next Steps 11/9/2026 Update to Public Works Committee 12/31/2026 Biddable Plans & Specifications Completed 2027 Easement Acquisition and Permitting Late 2027 Bidding 8 weeks 2028 Construction Questions? Village of Whitefish Bay Public Works Department 155 W. Fairmount Ave  Whitefish Bay, Wisconsin 53217  (414) 962-6690  Fax (414) 967-1391 Mathew Collins, Director of Public Works November 9, 2026 Memo to: Chairperson Serebin and Village of Whitefish Bay Public Works Committee From: Matthew Collins, Director of Public Works Re: Private Property Infiltration and Inflow (PPII) Project Updates In May, 2025, the Public Works Committee and Village Board approved new Private Property Infiltration and Inflow (PPII) Reduction Program guidelines for homeowners to participate with the MMSD program. Within Priority Area #1, there are over 100 properties that have been identified with public and private lead service lines (LSLs) . The program had 63 properties originally sign up to participate with the joint PPII/LSL program with 30 completed in 2026. Of the 63 properties, nine homeowners later declined to move into construction. The original goal of the 2026 program was to complete a total of 33 properties based on available MMSD and Water Utility funds available. A lottery system was used to select the properties for participation in the 2026 PPII program. Properties that signed up for the program that were not completed in 2026 were placed on the waitlist and are considered turnkey construction in 2027 since design has already been completed. In October, the Village was notified by MMSD that $500,000 in construction funds will be awarded to continue efforts with the PPII program to replace sanitary sewer laterals. The funding will allow for approximately 20 properties to be completed in 2027. The Village adopted the the 2026 – 2031 Capital Improvement Plan that supported the funding to replace lead service lines in conjunction with the PPII program. The total funding for the public LSL replacement for 2026 -2027 is $420,000. The anticipated cost of the 2026 LSL replacements is $275,000 leaving a remaining balance of $145,000 for the replacement of public LSLs in 2027. This would allow for approximately 17 properties to have their LSLs replaced if construction and engineering services do not exceed $8,500 per public LSL replacement. Given that there are 22 properties that remain on the waiting list that have been fully designed, it is recommended to complete the remaining waitlist properties in 2027. There will likely be residents that choose to dropout of the program, so the total number of replacements will be close to the available budgets. Once all properties have been completed that have shown a willingness to participate with the program, village staff will evaluate the program to make further recommendations to the Public Works Committee and Village Board on future PPII programs beyond 2027. Once MMSD finalizes the 2027 Funding Agreement, village staff will make formal recommendations to the Village Board for the 2027 PPII program. Informational Only – No Action Required by the Public Works Committee Village of Whitefish Bay MMSD Sanitary Lateral Program and Lead Water Service Line Replacements Whitefish Bay Public Works Committee Meeting: November 9 th , 2026 AGENDA 2 › Quick Recap of Program Goals – 2025 Design (Completed) – 2026 Construction (Ongoing / Wrapping Up) – 2027 Construction (Future) › Lessons Learned › Funding › Open Discussion / Next Steps PROGRAM OVERVIEW Program Goals: › General: – Replace 70 LSLs & 70 Sanitary Laterals. • 2026: 35 Replacements • 2027: 35 Replacements › Village: – Replace lead water services lines. › MMSD: – Remove Inflow and Infiltration (I&I) from private sanitary sewer laterals. › Homeowner: – Remove Lead Water Service Lines.. – New Sanitary Sewer Lateral. 3 Program Criteria: › Must Be: – Located within project area – Willing to participate › Must Have: – Private Lead Water Service – Public Lead Water Service – I&I present in Sanitary Lateral 2025 DESIGN OVERVIEW 4 2026 CONSTRUCTION OVERVIEW 5 2026 CONSTRUCTION: STATUS 6 # Address (Constructed 2026 Project) 1 4610 N Idlewild Ave 2 4768 N C umberland Blvd 3 4753 N Larkin St 4 4616 N Sheffield Ave 5 1606 E C umberland Blvd 6 4630 N Morris Blvd 7 1550 E C umberland Blvd 8 4616 N Bartlett Ave 9 1628 E C umberland Blvd 10 4624 N Newhall St 11 4633 N Larkin St 12 4664 N Morris Blvd 13 4765 N Woodburn St 14 1700 E C umberland Blvd 15 4750 N Larkin St 16 4759 N Larkin St 17 4792 N Ardmore Ave 18 4610 N Morris Blvd 19 1100 E C ourtland Pl 20 4620 N Newhall St 21 4621 N Bartlett Ave 22 1107 E C ourtland Pl 23 4614 N Morris Blvd 24 4634 N Woodruff Ave 25 4798 N Ardmore Ave 26 4651 N Larkin St 27 4615 N Newhall St 28 4617 N Morris Blvd 29 4613 N Morris Blvd 30 4744 N Larkin St 31 4633 N Morris Blvd 32 4737 N Larkin St Address (Drop Out 2026 Project) 1 4791 N Woodburn St 2 1221 E C ourtland Pl 3 4627 N Bartlett Ave 4 4633 N Bartlett Ave 5 4782 N C umberland Blvd 6 4786 N Ardmore Ave 7 4629 N Marlborough Dr 8 1584 E C umberland Blvd 9 4611 N Newhall St Address (2027 Project - On Waitlist) 1 4626 N Bartlett Ave 2 1614 E C umberland Blvd 3 4643 N Wildwood Ave 4 4632 N Bartlett Ave 5 4777 N Woodburn St 6 4722 N Ardmore Ave 7 4658 N Morris Blvd 8 4659 N Ardmore Ave 9 4700 N Sheffield Ave 10 4767 N Larkin St 11 4626 N Larkin St 12 4617 N Larkin St 13 4657 N Woodburn St 14 4627 N Larkin St 15 4746 N C umberland Blvd 16 4732 N C umberland Blvd 17 4620 N Bartlett 18 4758 N Larkin St 19 4610 - 4612 N Larkin St 20 4610 N Newhall St 21 4659 N Morris Blvd 22 4628 N Newhall St 2026 Construction: 32 Homes Completed (Varying Scopes of Work) 2026 Construction: 9 Homes Dropped out Residents on the Waitlist: 22 Homes 2026 CONSTRUCTION: PHOTOS 7 2026 CONSTRUCTION: PHOTOS 8 2026 CONSTRUCTION: PHOTOS 9 2026 CONSTRUCTIONL: LESSONS LEARNED 10 › Lessons Learned: Homeowner – Finished basements – Separated sanitary and water services – Electrical grounding • Plastic vs. Copper Water Services – Internal plumbing needs › Lessons Learned: Village / MMSD – Lead service line cost share with Homeowner (PSC) – Road impacts – Tree impacts – LSL Records › Steps Forward – Pre-Construciton Home Visits • Verifying Records and Home Impacts – Continue to Improve Bidding Documents FUNDING OVERVIEW 11 ORIGINAL BUDGET 2025 2026 2027 BUDGET TOTAL # OF HOMES BUDGET COST PER EACH HOME WHITEFISH BAY $0 $210,000 $210,000 $420,000 70 $6,000 MMSD $222,500 $929,455 $500,000 $1,651,955 70 $23,599 HOMEOWNER $0 $210,000 $210,000 $420,000 70 $6,000 2027 BUDGET BUDGET COST PER EACH HOME # OF HOMES 2027 GOAL WHITEFISH BAY $145,000 $8,500 17.1 20 MMSD $500,000 $25,000 20.0 20 HOMEOWNER $210,000 $8,000 26.3 20 2026 ENGINEERING CONSTRUCTION ALL IN (TO DATE) TOTAL # OF H OMES COST PER EACH HOME REMAINING BUDGET (+/-) WHITEFISH BAY $30,000 $245,000 $275,000 26 $10,600 $145,0 00 MMSD $124,900 $700,000 $824,900 30 $27,500 $500,000 HOMEOWNER $22,000 $50,000 $72,000 26 $2,800 $210,000 NEXT STEPS / OPEN DISCUSSION 12 › Original Goal: Replace 70 LSLs/Sanitary Laterals. – Engaged over 100+ Homes – 63 Participants › 2026 Original Goal: 35 Replacements – MMSD Funded: 33 Sanitary Laterals – 2026 Completed: 30 Sanitary Laterals – 2026 Completed: 26 Lead Water Services › 2027 Original Goal: 35 Replacements – MMSD Funded: 20 Sanitary Laterals – Complete the waitlist homes: 22 Homes Currently – Revised Goal: 20 Sanitary Laterals & 20 Lead Service Lines › Final Anticipated Program: Replace 50 LSLs/Sanitary Laterals. › 2028+ Goals: – Revisit Future Sanitary Lateral Program Goals • Leverage Village Capital Projects? • Village’s LSL Replacement # per year? • Standalone MMSD Projects? – Continue Engaging MMSD for Funding Opportunities https://arcg.is/115C04 Project Website Village of Whitefish Bay Public Works Department 155 W. Fairmount Ave  Whitefish Bay, Wisconsin 53217  (414) 962-6690  Fax (414) 967-1391 Mathew Collins, Director of Public Works 1 | Page Memo to: Chairperson Serebin and Village of Whitefish Bay Public Works Committee From: Maxine Miller, Staff Engineer Re: 2028 Watermain, Water Service Line Replacement Proposed Project Locations Starting in 2028, the Village will be mandated to replace 188 lead water service lines annually to meet EPA and DNR Lead and Copper Rule Improvement (LCRI) requirements. To meet this obligation while continuing to improve the Village's water distribution system and roadway infrastructure, village staff conducted a comprehensive evaluation of roadway segments throughout the community to identify the most suitable locations for coordinated watermain replacement, water service line replacement, and street resurfacing projects. DPW staff reviewed Village maps, historical infrastructure records, and roadway data. Several factors were considered as part of the evaluation, including: • Number of confirmed public and private lead water service lines connected to each watermain • Street condition • Age and material of existing watermains • Frequency and dates of watermain breaks • Overall project constructability and coordination of infrastructure improvements Based on this evaluation, staff identified the following two roadway segments as the highest priorities for the 2028 construction program: • N. Kent Avenue: E. Devon Street to E. Lakeview Avenue • N. Cumberland Boulevard: N. Lake Drive to E. Hampton Road By 2028, the pavement condition of these roadway segments is projected to have an average rating of approximately 4 to 5 on the 10-point PASER pavement rating scale, further supporting the coordination of underground utility improvements with street resurfacing. Upon completion of the watermain and LSL replacements, each street will be fully resurfaced. The proposed project areas provide an opportunity to replace a significant number of lead water service lines while coordinating improvements with the planned watermain and roadway work. The following table summarizes the existing water service line inventory within the proposed project limits: 2 | Page Water Service Line Classification Number of Properties Non-Lead service line on public and private 12 Lead service line on public side only 29 Lead service line on private side only 12 Lead service lines on both public and private sides 145 Total lead service lines to be replaced 186 Total properties served within project area 198 The proposed 2028 project would result in the replacement of approximately 1.08 miles of watermain and 186 lead service lines. In addition, the Village typically replaces an average of 25 resident-initiated or service line breaks annually outside of watermain replacement project limits. Together, these efforts would allow the Village to achieve its annual requirement of 188 lead service line replacements in 2028. Prior to construction, DPW staff will conduct a comprehensive inspection of existing utility infrastructure within the proposed project limits and complete any necessary repairs to minimize future disruptions and avoid unnecessary roadway restoration. Additional project coordination and evaluations will include: • Sanitary Sewer Infrastructure: Continue annual sanitary sewer inspections and identify opportunities for necessary repairs and lining. • Stormwater and Flooding: Review the Village's stormwater and sanitary sewer studies and flood risk assessment to identify recommendations applicable to the proposed project areas. • Pedestrian and Bicycle Facilities: Review the Village's pedestrian and bicycle study to identify potential improvements or recommendations that can be incorporated into the projects. • Geotechnical Investigation: Obtain geotechnical samples to evaluate existing subsurface soil and pavement conditions and assist with determining appropriate roadway reconstruction and resurfacing methods. These evaluations will help ensure that the proposed projects address not only immediate water infrastructure needs but also other long-term infrastructure and transportation priorities within the project areas. Refer to attached map for the proposed 2028 watermain and LSL program area. Village Staff Recommends to the Public Works Committee: To recommend approval of the proposed 2028 project locations for the annual watermain and LSL replacement program area. 2028 Watermain Replacement and Street Resurfacing Map Watermain Replacement, Water Service Line Replacements, and Street Resurfacing Street Resurfacing Only DRAFT Village of Whitefish Bay Public Works Department 155 W. Fairmount Ave  Whitefish Bay, Wisconsin 53217  (414) 962-6690  Fax (414) 967-1391 Mathew Collins, Director of Public Works 1 | P a g e Public Works Committee Status Report for November 2026 Note: New status updates are in red text. 5111 N. Lydell Ave. Public Works Site: • Project Budget: $590,000 • Engineer/Contract: Sigma/$29,800 • Current Phase: Rezoning & Environmental Assessment • Target Completion: Winter, 2025/2026 Project Overview: Sigma had completed a Phase I and Phase II report for the Department of Public Works (DPW) site located at 5111 N. Lydell located in Glendale. The purpose of documents included a Focused Environmental Site Assessment (ESA) a condensed Property Condition Assessment (PCA), site survey, existing building repair planning, design development of salt storage facility, and site planning/civil engineering, and municipal interviews to determine the feasibility of shared use within neighboring communities. Sigma is currently under contract to assist with the Phase II Environmental Site Assessment (ESA) and undergo a rezoning application with the City of Glendale to receive approvals for the proposed facility site plan construction activities. The Phase II ESA has been completed by Sigma. Based on the results of the report, it will be necessary to notify the results with the DNR that will likely trigger further site investigations and potential soil remediation efforts. The Village Board approved the MOU with the City of Glendale and Village of Shorewood on 5/4/26 for the planning, development, and shared use of a salt storage facility. The timeline for the shared salt storage facility includes design and construction contracts by July to be considered by the Village Board with final completion of the facility by December, 2026. The Phase II Environmental Site Assessment (ESA) activities were completed in summer/fall 2025 which included the advancement of soil borings, installation of temporary groundwater monitoring wells, and the collection of soil and groundwater samples. The Phase II activities were completed to evaluate the potential presence of impacted soil and groundwater at the Site based on Recognized Environmental Conditions (RECs) identified within a Focused Phase I ESA completed in 2023. Considering the detected impacts, Sigma 2 | P a g e recommended the preparation of a release notification in accordance with the Wisconsin Hazardous Substance Spill Law. The existing cold storage/salt storage facility located at 5111 N. Lydell had an existing roof analysis completed to develop potential roof system options. The inspection and core samples were taken to evaluate options for roof maintenance and found that the roof will require a full replacement due to saturated decking below the existing roof membrane. Design is anticipated to be completed in fall with bidding to occur late 2026. Construction is planned for 2027. Glendale is currently constructing a new salt storage facility with capacity for Whitefish Bay and Shorewood. All three municipalities entered into an agreement to have a shared salt storage facility to help with future storage and operational needs. DPW met with Glendale and Shorewood to review salt loading and operating procedures in October. The new salt storage facility is expected to be completed in December, 2026. DPW will deplete the salt from the current 5111 N. Lydell site during the winter of 26-27 and then transition to Glendale in 27-28. Phase II Environmental Site Assessment (ESA) activities were completed in summer/fall 2025 which included the advancement of soil borings, installation of temporary groundwater monitoring wells, and the collection of soil and groundwater samples. The Phase II activities were completed to evaluate the potential presence of impacted soil and groundwater at the Site based on Recognized Environmental Conditions (RECs) identified within a Focused Phase I ESA completed in 2023. Based on review of the results of the Phase II ESA soil and groundwater analytical results the Village prepared and submitted a release notification in accordance with the Wisconsin Hazardous Substance Spill Law. Next steps will include site and field investigation activities per DNR requirements. Ash Tree Replacement, Planting & Treatment Annual Program • Project Budget: $215,000 • Engineer/Contract: Wachtel Tree Science/$35,000 • EAB Removal/Planting Contractor M&M Tree Care/146,304 • EAB Injection Contractor Crawford Tree & Landscape Services/$28,256 • Current Phase: Construction • Target Completion: Summer, 2026 Project Overview: In 2010, the Village’s street trees consisted of 47% ash. As of 2022, the ash tree population was reduced to 24% due to the Village’s adopted annual ash tree replacement and treatment program. This program aids in the incremental replacement and diversification of street trees to limit the risk of the EAB and impact of future tree diseases. At the end of 2026, the Village will have 1,565 remaining ash trees, roughly 18% total street tree population. In July, 2024, the Village adopted a policy to reduce the total ash tree population to 10% by the end of 2031. The Village is on target to meet this objective with the removal and replacement of 105 ash trees per year. 3 | P a g e The Village has five years of removals remaining meet the 10% ash tree population goal. A total of 1,040 ash trees will remain in the Village and will continue to be treated to the end of the ash trees natural lifespan. This amounts to a remaining 525 trees to be removed at 105 trees per year as in past practice. Based on these known goals, it was determined to best align the EAB treatment program with the removal program. Currently, the Village treats ash trees once every three years. This is still the recommended treatment schedule from the Village’s arborist consultants. Village staff worked alongside arborist/consultants to proactively identify 525 ash trees that will be part of the next five year removal plan. Based on research and past practice, consultants are comfortable with removing these 525 trees from the EAB treatment program and will no longer be selected for insecticide treatments. These trees have been previously treated and the insecticide will support tree health until the planned removal occurs over the five year period. In the 2026 program year, the Village will reduce the treatment from 248 ash trees. This is an estimated cost savings of $18,710 in treatments in 2026. Over the next five years, it is anticipated that the Village will save $83,000 - $97,000 in treatments with the removal of the 525 ash trees from the EAB treatment program. The 2026 street tree replacements will be funded through the MMSD program’s remaining grant funds. Due to lower than expected bid results from the 2025 program, the Village was able to leverage $72,000 from this grant to fund the 2026 street tree replacements. All ash tree replacements have been planted per plan. Fall tree replacements are set to replace approximately 70 street trees as well as new trees donated by the Little League at Craig Counsell Park will start in early November. Plantings are expected to be completed by mid-December. Bicycle and Pedestrian Safety Improvements • Project Budget: $35,000 – 2026 Roadway Safety Funds • Project Budget (Construction): $200,000 • Contractor N/A • Current Phase: Temporary & Permanent Improvements • Target Completion: 2026 The Village Board accepted the Bicycle and Pedestrian Safety Study on April 7, 2025 that includes • Public Involvement & Findings • Data Collection & Findings • Safety Analysis • Recommendations o Short-Term & Long-Term Street Improvement Recommendations o Traffic Calming Policy Recommendations o Law Enforcement Recommendations 4 | P a g e o Street Lighting Evaluation • Bicycle & Safety Education Program Recommendations • Funding Options Village staff created a webpage for residents to review the Study and ongoing projects: https://www.wfbvillage.gov/435/7262/Village-Wide-Bike-Pedestrian-Safety-Stud In addition to the permanent improvements, the Public Works Committee gave village staff the recommendation on additional temporary traffic calming locations. These locations were chosen based on the Safe School Zone TAP grant project: The following projects are planned for 2026: 1. Safe School Zone Signage Improvements (2026 – 2027) a. JCC School Zone Area Complete including updated signs and new dynamic speed feedback signage b. Lake Drive – Replace/modernize existing overhead school zone signs (Richards Elementary School) – New overhead signs ordered. 2. Safe School Zone Intersection Improvements (Design in 2026: Construction 2027) a. 90% design complete. Construction administrative services approved by the Village Board on 10/5/26. Project on schedule to be constructed in 2027. 3. Lake Drive and Beaumont: RRFB, curb extensions, and pedestrian refuge on Lake Drive a. Feature substantially complete. 4. Silver Spring Dr. & Hollywood Ave.: Curb Extension & Pedestrian Median a. Feature substantially complete. 5. Silver Spring Dr. & Consaul Pl./Diversey Blvd.: New traffic signals a. New curb ramps substantially complete. New electrical conduits, utilities, and signal cabinet will be ready for new traffic signal installation. Light poles that will be used with the traffic signals have been ordered but have a long lead-time for delivery. Signals are expected to be installed in late November, 2026. 6. Marlborough & Colfax: Permanent traffic calming installations a. 7Complete. 7. Santa Monica and Belle: Temporary Traffic Calming per proposed Safe School Zone design a. Temporary delineators installed 8. Santa Monia and Day: Temporary Traffic Calming per proposed Safe School Zone design a. Temporary delineators installed 9. Hampton and Ardmore: Temporary Traffic Calming per proposed Safe School Zone design a. Temporary delineators installed 10. Traffic Calming Policy: Draft a traffic calming policy for response to resident requests Whitefish Bay participated with Milwaukee County’s Safe Streets for All grant that was submitted in May. Whitefish Bay requested a total of $2,000,000 in project funding (80/20 split) for Lake Drive gateway/traffic calming features as outlined in the Village Wide Bicycle & Pedestrian Safety Study 5 | P a g e (page 53). Milwaukee County applied for a total of $25,000,000 in funding requests as part of the grant application. The Village’s consultant, raSmith developed concepts and budget estimates for each of the proposed project locations that were presented to the Public Works Committee on June 8th for comments, feedback, and recommendations. These concepts and budget estimates will be used to further apply for grant funding as well as utilized to develop demonstration sites to evaluate the effects of the features temporarily prior to final design or implementation. Hampton & Santa Monica Intersection Traffic Signal Replacement & Safety Improvements: • Project Budget: $1,543,487 • Designer/Contract: Strand/$186,360.93 • Contractor/Contract: TBD • Current Phase: Design Contracts • Target Completion: Design, 2026 – Construction, 2028 Project Overview: The Village has applied for and received Highway Safety Improvement Program 90% funding from the Wisconsin Department of Transportation (WisDOT) for complete intersection traffic signal replacement and safety improvements within the intersection of Hampton and Santa Monica. The intersection has experienced a history of severe crashes. Nine crashes have occurred at this intersection in the five-year period from 2019 through 2023, including one involving a pedestrian. Traffic signal poles have also been struck four times as well as the Village median sign struck two times in the past five years. There are many contributing factors to the frequency and severity of the crashes, including the lack of protected left-turning movements, older traffic signal equipment, no signal heads present over the northbound and southbound lanes, and signal poles being in the medians on the north and south legs. For pedestrians, there are no high-visibility crosswalks and the curb ramps are not up to ADA standards. WisDOT HSIP funding was granted based on the high accident rate at this intersection as well as age of current infrastructure and other safety factors. The project scope will include updates to traffic signals, including new poles to provide signal heads with retro-reflective back plates over each approach lane, install new controller/cabinet, install new video vehicle detection, install audible push buttons, install new emergency vehicle preemption, and replace all conduit/wiring/pull boxes. It is also proposed to add left-turn protection to all left-turn movements via new left-turn signal heads. Signal heads with flashing yellow capabilities are requested because they can operate in protected-only mode, as proposed, but offer more flexibility for accommodating future travel demands and incorporating features like adaptive protected phasing for pedestrians. Geometric improvements include pavement repair, friction treatment via concrete grooving, and curb bumpouts (where feasible) with ADA compliant curb ramps and high-visibility crosswalks. 6 | P a g e The intersection of Hampton and Santa Monica border the Village of Whitefish Bay and the City of Milwaukee municipal boundaries. Seventy-five percent of the intersection is within the Village and twenty-five percent (southwest corner) is within the City of Milwaukee. The Village and the City have a MOU that that agreed to terms of design, construction, maintenance, and cost share. The updated MOU allows for the Village and the City to work together to modernize the intersection and allow both municipalities to cost share the HSIP grant. Village staff received final authorization for expenditures from WisDOT to start on the design phase of the intersection improvement project. Village staff drafted and submitted a Request for Proposals (RPF) to qualified design firms on September 30th. RFPs are due on Friday, October 24th and will then be evaluated and ranked prior to making recommendations to the Public Works Committee, Village Board, and WisDOT. Once a firm is approved, design work will kickoff in late 2025 and is expected to continue throughout 2026. The Village Board approved the draft design and engineering services agreement to Strand Associates on February 2nd. The final agreement has been signed by WisDOT allowing for design work to begin. Strand gathered traffic counts in April including the installation of temporary cameras within the intersection. Survey activities occurred the week of April 13 – 17. The design kick-off meeting was on April 17th to further review design goals with the municipal stakeholders (City of Milwaukee, WisDOT, and Village). The Operational Planning Meeting was conducted in May with all necessary stakeholders. A Public Information Meeting occurred on Wednesday, June 24th from 5 – 7pm at the Whitefish Bay Library. Representatives from the Whitefish Bay Department of Public Works and the engineering design consultant were available to discuss the proposed project and address any questions or concerns. Project-related sketches and three concepts were displayed at the meeting. Strand Associates presented the three concepts and public input during the July Public Works Committee meeting Draft concepts were presented to the Village Board on 8/31/26. Board comments and stakeholder feedback will be evaluated to develop final design recommendations. Real estate meetings for temporary limited construction easements started in October and will continue through 2027. Klode Park Warming House Redevelopment: • Project Budget: $1,500,000 • Designer/Contract: TBD • Contractor/Contract: TBD • Current Phase: Request for Proposals • Target Completion: Design, 2026 – Construction, 2027 7 | P a g e Project Overview: On August 7th, 2023, the Village Board and Public Works Committee adopted the 2024 - 2028 Comprehensive Outdoor Recreation Plan (CORP). The CORP created the framework for the Village to develop a strategic plan to optimize outdoor park and recreation spaces which was then integrated into the Village Board’s adopted 2026 – 2031 Capital Improvement Plan (CIP). These guiding policy documents are used to aid in the strategic planning and prioritization of public infrastructure projects. As part of the CIP public meetings held in 2025, the Village Board made the request to include $1.5 million into the 2027 budget to support improvements to the Klode Park Warming House. The existing Klode Park warming shelter functions as a year-round facility that includes two single stall restrooms and a small gathering place. The facility is heated to accommodate for winter activities including ice skating when weather allows. Based on the goal to construct the warming house in 2027, there is a need to start design in 2026. Village staff created a Request for Proposals (RFP) with submissions due on March 27th, 2026. After village staff reviews and ranks the RFP submissions, the final recommended design firm proposal will be presented to the Public Works Committee and Village Board in April, 2026. Meetings with key stakeholders occurred with neighbors as well as a Focus Group with representatives attending from the Village Board and Civic Foundation. Two a additional public meetings included a Kids Charrette and an Open House Public Meeting. These meetings helped the design team build the framework on the three concepts based on the vision, goals, challenges, and opportunities for the warming house and band shelter. These concepts were then shared with the public to create a survey to gain additional feedback and opinions to narrow the direction of the proposed new warming house and band shelter/pavilion. The Village Board reviewed public survey comments and feedback to narrow the Klode Park warming house design to one concept. The project concepts were presented to the Architectural Review Commission on 10/15/26 and approved on 11/5/26. Village staff met with stakeholders on 11/2 to review the site plans and verify special events and recreational activities layouts. The design team will transition to design development with final plans presented to the Village Board on November 16th. The anticipated construction documents are planned to be completed by mid- December. Library Boiler Replacement: • Project Budget: $240,000 • Engineer/Bid Assistance Clark Dietz/$31,600 • Contractor: Southport Mechanical, LLC/$199,249 • Current Phase: Construction • Target Completion: Fall, 2026 8 | P a g e Project Overview: The Library boilers were installed in 1999 with numerous repairs required over the years, but the system runs inefficiently and is at the end of its useful life. The risk of not replacing the boilers will result in higher expenses for emergency repairs or necessary emergency replacements. A project design kick-off meeting occurred on January 15th to review existing mechanical equipment and controls to start on design scope of the boiler replacement project. A focus will be on energy efficiency with the design and specifications of a new boiler system to continue to reduce energy costs. The project was awarded to Southport Mechanical with contracts anticipated to be completed in early June. The boiler replacement project is substantially complete. Boiler startup and training occurred on 9/9/26. Final punch list items are ongoing. Lead Service Line Replacement Development Plan: • Project Budget: $50,000 • Engineer/Contract: City Water, LLC/$40,500 • Current Phase: Study • Target Completion: 2025/2026 Project Overview: The Village along with all US municipalities are required by the US EPA to submit a Lead Service Line Replacement Plan (LSLRP) in accordance with Lead and Copper Rule (LCR) revisions. On October 30th, 2024, the EPA finalized the Lead and Copper Rule Improvements (LCRI). These updates were shared and presented during the Village’s Open House event held on 12/2/24. Residents can review lead service line information on the Village’s webpage: https://wfbvillage.gov/439/Lead-Service-Line- Replacement-Project City Water was hired by the Village to create a material inventory of water mains, services, and private laterals to comply with the LSLRP deadline of October, 16 2024. The current project scope by City Water will include a development plan for replacements of lead service lines (LSL), assist in development of a customer outreach program, identify potential private funding sources, identify and recommend any ordinance changes, develop standards for replacement/construction, prioritize replacement of LSLs, and develop investigation protocols and procedures in the event of a sample result above the action lead level. The North Shore Water Commission is responsible for the coordination of lead and copper sample collections used for regulatory compliance. In addition, the Commission manages and monitors a corrosion control inhibitor called orthophosphate to reduce the amount of lead and copper that can leach from pipes and plumbing materials owned by member municipalities and their property owners. Over the years, the Commission has participated in a number of research projects to optimize corrosion control. In 2022, the Commission 9 | P a g e completed its latest corrosion control optimization study and was authorized by WDNR to implement the recommendations from that study. As a result, the Commission increased the level of its corrosion inhibitor from 1 part per million (ppm) to 3 ppm. After the study officially concluded, plant staff monitored water quality, and the monitoring showed, and continues to show, that 3.0 ppm of orthophosphate effectively reduces lead and copper corrosion. The Village continues to be in compliance with all lead and copper levels. Additional details can be reviewed as part of the 2025 Annual Water Quality Report. City Water is contracted to assist the Village with the following consultation services: o Service Line Inventory – Completed (2024 & 2025) https://www.wfbvillage.gov/DocumentCenter/View/3004/Lead-Line-Inventory- o Customer Outreach ▪ Community webpage - https://wfbvillage.gov/439/Lead-Service-Line- Replacement-Project ▪ Utility Policies/standards – Ongoing ▪ Assistance with ordinance changes – Completed. On August 10, 2026 the Village approved Ordinance No. 1929 establishing a private lead service line replacement program and establishing a financing program ▪ How to identify a lead service line –New webpage & Contact Us page (above) ▪ Customer Notification Letters – Completed • Annual lead service line material mailings • Anticipated new sampling procedures o Financial Plan ▪ Private/Public Options – Completed – 10-year loan program adopted by Village Board as part of the service line replacement special charge program. ▪ Lead Service Line Replacement Plan – Completed. Updates will occur annually to determine locations of 1-mile of watermain and LSL replacement areas. o Standards for replacement/construction – PPII & LSL replacements ongoing for 2026. Design for the 2027 watermain & LSL replacements are 90% complete with bidding set for November, 2026. o Sampling ▪ Investigation protocols and procedures – Site monitoring plan for 2026 was approved by the DNR. Test kits are sent out to select residents bi-annually (2x per year). o Final reports Questions regarding the subject of lead service lines can also be emailed at: leadquestions@wfbvillage.gov The DNR has posted a Lead Service Line Replacement Outreach Funding grant for communities to apply for financial support to aid in community outreach and education. The Village of Whitefish Bay and Shorewood have mutually desired goals on community outreach and education. The management team met with the North Shore Health 10 | P a g e Department to collaborate on a shared full-time dedicated case manager to be a front line representative to assist each Village with outreach initiatives along with GIS/online educational features. This grant was awarded in fall, 2025 with additional funding in approved in 2026. Village staff worked with a student intern paid through UW-Milwaukee to review archive building permits to confirm/update a batch of water utility material records (lead service lines). This assisted with improved accuracy of the Village’s lead service line inventory and aid in future planned water main replacement projects. The next step in the process is to evaluate data to prioritize a water main replacement program. Village staff annually evaluate road condition ratings, lead service line inventories, water main break data, and water main age to determine project priority areas. Village staff and the health department specialist are working to develop standard operating procedures and the review of archive documents to ensure that service line identification and record keeping is compliant with EPA/DNR guidelines. This will also assist with building the foundation for GIS recordkeeping and the development of the LSL community dashboard that is planned to rollout in 2026. Village staff along with the NSHD Environmental Specialist have continued to work on integrating the Village’s GIS as the main platform for service line records and inventory. Continuous improvements have been made to the record system to improve the accuracy of historic archives, construction documents, and future replacements. North Shore Water Commission Basin #5 Repair Project • Project Budget $904,109 • Current Phase: Design • Engineer/Contract: SEH/$118,481 • Contactor: J.H. Hassinger, Inc/$1,035,495 • Target Completion: 2026 Project Overview: The Village is part owner of the North Shore Water Commission (NSWC) along with the City of Glendale and Village of Fox Point. The three municipalities share financial responsibilities and oversight of the NSWC based on percentage of water usage rates (Whitefish Bay owns approximately 31.5% share of the NSWC). The NSWC plant operates a water treatment plant (WTP) in Glendale and is generally considered a conventional surface water treatment plant. As part of the treatment processes, there are five (5) below grade flocculation and sedimentation basins. Basins No. 1-3 were built as part of the original plant construction project in 1962 and Basins No. 4 & 5 were built as part of the plant expansion project in 1972. In 2018, NSWC staff identified equipment failures in Basin No. 5 and it was subsequently removed from service. In 2023, NSWC commissioned Baxter 11 | P a g e & Woodman to prepare a preliminary engineering report (PER) to identify necessary improvements bring the basin back into service. The long term vision for the WTP is to operate Basin No. 5, rehabilitate Basin No. 4, and abandon Basins No. 1-3 based on the current needs of the communities. The NSWC approved the engineering proposal by Short Elliott Hendrickson Inc. (SEH) in the amount of $118,481 for design services for the Basin No. 5 Repair Project. Whitefish Bay’s financial responsibility through the Water Utility will be approximately $35,550 based on water utilization rates. Design will continue throughout 2024 with final design anticipated to be completed by spring, 2025. Basin #5 bids were open on 9/30/25 with four bidders submitting for this project. The low bidder was awarded to J.H. Hassinger, Inc. in the amount of $1,035,495. The project is within the Village’s portion of allocated 2025 budget. Due to change orders, supply chain, and custom fabrication, the project completion is now anticipated to be early 2027. Private Property Infiltration & Inflow & Lead Service Line Replacement: • Project Budget: $1,571,955 • Current Phase: Construction • Engineer/Contract: Clark-Dietz/$441,650 • Design Completion: Fall, 2026 • Contractor/Contract: Mid City Corporation • Target Completion: 2026 Project Overview: MMSD has established the Private Property Infiltration and Inflow (PPII) Reduction Program to provide guidelines, requirements, and a funding structure to allow for local municipalities to participate in a joint effort to reduce stormwater from entering into the wastewater collection and treatment utilities. It has been found that during wet weather events, infiltration and inflow (I&I) into privately owned sewer laterals contributes to the risk of sewer overflows. The reduction of clear water flows into the sanitary sewer system has greatly assisted in reducing and eliminating sewer basement backups in a previously identified prioritized area of the Village. The MMSD PPII Program was implemented in 2010 utilizing monies set aside from property tax levy capital budget revenues paid into the MMSD from each of the 28 MMSD municipalities. Those allocated monies could then only be used for clear water removal work on the private side of the sanitary sewer system. From 2017-2019, the Village was able to complete 303 private property sanitary sewer lateral linings under this program out of the 407 applicants. As part of the annual PPII program, the Village has worked with MMSD representatives in 2024 to realign best practices with the construction methods used to manage private property laterals. Due to MMSD’s concerns of Cure in Place Pipe (CIPP) construction methods, the Village and MMSD agreed that CIPP will not be an accepted construction activity for future projects. The Village approved the use of the 2024 - 2025 PPII funding to 12 | P a g e design for full private sanitary lateral replacements based on existing data of high I&I areas within the Village. The Village was awarded funding resources to educate residents of the PPII program, develop design/specifications, and cost estimates for a total of 70 homes to have their lateral replaced. The project area will continue to focus on Priority Area #1 located on the southern section of the Village’s municipal boundary as shown on the WWPF Metersheds. There are over 200 residents that are within this area that would qualify for the program of which, 28 properties have signed up to participate with the new program. A Public Information Meeting (PIM) occurred on Wednesday, June 11th. Eligible properties (108 within Priority Area #1) had until June 27th, 2025 to sign a Right of Entry (ROE) agreement showing interest in the program. The Village received a total of 42 ROE applications with the goal of receiving 70 participants. Televising of the sanitary sewer laterals has been completed with the 42 properties to qualify these residents for the program and will transition these properties to final design and construction documents. The Village applied for MMSD competitive funding on 9/2 to financially support the construction of all 42 properties in 2026. MMSD approved the final funding agreement to support 33 of the 42 properties to participate in the PPII/LSL program. A lottery system was used to qualify the 33 property owners. 30 properties completed in 2026 with final restoration and punch list items remaining. MMSD notified the Village of $500,000 in PPII funding for 2027 sanitary sewer replacements. Roadway Rehabilitation Program: • Project Budget: $ 700,741 • Current Phase: Construction • Engineer/Contract: Clark-Dietz/$6,500 • Contractor/Contract: LaLonde Contractors/$630,095 • Target Completion: 2026 The resurfacing of Devon Street and Bay Ridge Avenue was initially planned to be a standard asphalt mill and overlay project. However, during storm sewer repair in anticipation of the resurfacing program, it was discovered that the asphalt on Devon Street does not have an adequate subbase. The existing road surface was installed directly on soil. A standard mill and overlay project on a modern roadway would typically resurface the road pavement utilizing the support from the existing subsurface. In addition to the lack of proper road subbase, the soil in the project area experiences a notable amount of natural groundwater drainage; Village staff have observed groundwater surfacing through cracks in the pavement. The improper ground water drainage, compiled with the freeze-thaw cycles in Wisconsin’s winter conditions, exacerbates the pavement’s cracking. To provide an adequate drainage 13 | P a g e route for groundwater, the project must account for the addition of modern drain tile, which will extend the useful life of the road. The project was awarded to LaLonde Contractors to complete the roadway rehabilitation project on Devon and Bay Ridge in 2026. The contractor is required to be substantially complete with the project by November 6th with final completion by November 20th with 45 calendar days to complete from formal notice to proceed. Devon and Bay Ridge projects are substantially compete. Final walkthroughs occurred in late October to identify punchlist items that need to be completed prior to final payments. Sanitary Sewer Main Lining: • Project Budget: $ 515,000 • Current Phase: Construction • Engineer/Contract: Clark-Dietz/$33,000 • Contractor/Contract: Visu-Sewer/$247,094.50 • Target Completion: 2026 The Village conveys sanitary sewer through over 37 miles of mainline and 920 manhole structures. This sewer is transported to Milwaukee Metro Sewerage District (MMSD) for treatment via the Milwaukee Interceptor Sewer (MIS). The Village sanitary sewer mainlines, ranging from 8” to 36” in diameter, are routinely televised using a crawler camera which identify needed repairs to sanitary lines typically through cure in place pipe technologies. This is an annual program to ensure the Village owned sanitary sewer mains and manholes are maintained to reduce risk of basement backups to residents. Currently, 64% of the Village’s sanitary mains are lined with 36% unlined. The 2026 project includes a proposed 1.3 miles of 8” pipe to be lined in 2026. This project will combine the borrowed funds from 2025 and 2026 for a larger area of lining since this was not completed in 2025. The Village Board approved the contract to Visu-Sewer during the February 2nd meeting. Visu-Sewer has started to complete onsite fieldwork in preparation for the lining program. Construction is anticipated to start in mid-December. Based on available budgets, Village staff has increased the amount of sanitary sewer main lining to occur during this program year. Approximately 2 miles of sanitary sewer main will be lined this season. School Zone Safety Improvement Project: • Project Budget: $822,000 • Current Phase: Design • Engineer/Contract: raSmith/$140,030.76 • Design Completion: November 2026 14 | P a g e • Contractor/Contract: TBD • Target Completion: 2027 Project Overview: The Village was awarded a WisDOT Transportation Alternatives Program (TAP) grant with the intent of updating the signing as well as implementing numerous other safety enhancements for all eight school zones. The goal is to substantially reduce the crash risk for walking or bicycle riding within these high pedestrian traffic areas. The Village received and signed the State/Municipal Agreement (SMA) TAP grant to proceed with implementing the project. The TAP grant will cover up to 80% of design and construction costs for this project. WisDOT has authorized $61,600 in design funding for this project and the Village budgeted $15,400 for the 20% cost share within the 2025 budget. The Public Works Committee and Village Board voted to award the consultant project contract to raSmith to assist with design/engineering of five school zone areas: o Santa Monica & Belle – Bump out/intersection improvements (Richards Elementary School) o Santa Monica & Day - Bump out/intersection improvements (Richards Elementary School) o Beaumont & Santa Monica – Intersection improvements per 2024 Beaumont TADI Traffic Study (St. Monica School) o Ardmore & Hampton – Bump out/intersection improvements (Cumberland Elementary School) The Village hosted a kickoff Operational Planning Meeting with internal stakeholders on 7/31/25 to review project goals and outcomes. A Public Involvement Meeting occurred on October 22nd from 5pm – 7pm at the Whitefish Bay Public Library. The Village and design team compiled feedback from residents on the proposed improvements and shared input with the Public Works Committee. These proposed improvements were further discussed with the Public Works Committee in November to give designers direction on project construction scope. Short-term traffic cones and delineators were installed on Santa Monica & Belle, Santa Monica & Day, and Ardmore & Hampton. These features will be part of the traffic calming temporary improvement zones that reflect the Bicycle and Pedestrian Safety Study recommendations. These features are planned to be staged until the permanent features are constructed during the 2027 construction season. Final plans will be completed by November with bidding schedule for early January. Construction is anticipated to occur in June when school is out of session. 15 | P a g e Sendik’s Re-Development Public Improvements: • Project Budget: $2,764,405 • Current Phase: Bidding • Engineer/Contract: Clark Dietz/$422,100 • Contractor/Contract: TBD • Target Completion: 2027 Project Overview: On October 6, 2025, the Village Board approved Ordinance No. 1918 to rezone the necessary parcels to a Planned Development District (PDD) for the construction and funding requirements for the Sendik’s Redevelopment project. In addition to the proposed private redevelopment, there are a number of public improvements as part of the project scope aimed at addressing utility improvements, traffic, and pedestrian safety. The Village’s engineering services contractor, Clark Dietz alongside village staff presented these proposed improvements during the August Village Board meeting as well as final design recommendations approved by the Village Board on September 15th, 2025. Clark Dietz, with assistance of village staff and the Sendik’s team have worked to develop construction documents and specifications that are now finalized. Sendik’s has integrated these public improvement design documents into a bid package that will be solicited to qualified contractors to perform these activities during the 2026 construction season. Major construction activities are now substantially complete. Contractors are working on final punchlist tasks including signage, bike racks, pavers, and the village monument sign. The traffic signals for Consaul Pl. and Silver Spring Dr. are planned to be installed in early December. Sidewalk Replacement Program: • Project Budget: $175,000 • Current Phase: Construction • Engineer/Contract: Staff Engineer • Contractor/Contract: Forward Contractors/$90,304 • Target Completion: Fall, 2026 Project Overview: DPW annually rotates within seven quadrants to replace sidewalk panels that are at the end of their expected useful life. Sidewalk improvements include replacement of sidewalks that pose a hazard, terrace grading in areas to improve drainage and reduce icing, and ADA compliant ramp additions. In addition to panel replacement within the proposed project area, residents submitted requests to have DPW staff review the need to replace unsafe sections of sidewalk anywhere within the Village limits. The annual sidewalk program contract was awarded to Forward Contractors. The sidewalk replacement program is substantially complete with final improvements to Klode Park multiuse path and the Police Department sidewalk planned for November. 16 | P a g e Storm and Sanitary Sewer Improvement Planning: • Project Budget: $50,000 • Current Phase: Contract Approvals • Engineer/Contract: Clark-Dietz/$50,000 • Design Completion: Summer, 2026 Project Overview: The Village recorded 9.2” of rainfall during the storm event on August 9th – 10th which was categorized as a 1,000-year flood event (.01% chance of occurring in any given year). As part of the Village’s response, efforts will be made to evaluate the last event's data, past storm/sanitary studies, historical records, GIS data and research to make stormwater and sanitary sewer improvement recommendations in 2026. After the recommendations are presented and prioritized by the Board, the project scope will transition efforts on project design and engineering in 2027 to determine the financial impact and recommendations for future CIP borrows. Village staff worked with the village engineer to scope the planning efforts to be conducted in 2026 including: • Flow Monitoring/Metering/Bypass Pumping – Standard Operating Procedures • Sanitary and Strom Sewer Performance Evaluation • Relief Sewer Needs Evaluation (Basin 6) • Existing SSO bypass Improvement Recommendations The Clark Dietz project proposal was approved by the Village Board in March, 2026. The Study’s kickoff meeting occurred on April 17th with the project scope anticipated to be completed in four months. The final report and recommendations to be presented to the Village Board. Clark Dietz started to review historic archives and conduct field investigations as part of the report’s scope. Field staff and engineers completed site visits to known storm/sanitary bypass locations to verify measurements on 6/2 & 6/3. Village staff and Clark Dietz met on June 26th to evaluate the data and field reports to start planning for recommendations to be presented to the Village Board. The draft report is under review by Village staff with the final draft report to be presented to the Public Works Committee in October. The draft report was presented to the Public Works Committee and accepted by the Village Board on 10/26/26. Storm Sewer Outfall Rehabilitation Planning: • Project Budget: $400,000 (2026 & 2027 CIP) • Current Phase: Design Contract Review • Engineer/Contract: Ruekert Mielke/$82,801 • Design Completion: Fall, 2026 • Contractor/Contract: TBD 17 | P a g e • Target Completion: TBD Project Overview: On February 17, 2025, the Village Board approved the contract for Mid City Corporation that includes the review of as-built drawings, inspection of the remaining four Lake Michigan outfalls and contiguous manholes, document existing conditions, and complete inspection reports including repair suggestions and cost estimates. In April, 2025, Mid City performed the inspections of all accessible stormwater outfalls that discharge into Lake Michigan with the exception of LM4 that has recently been rehabilitated. As part of the inspections, Mid City has completed their analysis, documentation of findings, recommendations, budget estimates, and project priorities within the report. The final report will be used to guide the Village with future projects and capital budget planning to maintain these critical features. Village staff utilized the Mid City Report’s recommendations to transition to further guide design and engineering for the necessary repairs to Lake Michigan #1 (LM1) outfall as well as safety grate outfall installations. Village staff have evaluated the recommendations with specialized engineers that have experience with unique storm sewer projects in similar size and scope. Ruekert Mielke was awarded the design service agreement by the Village Board. Design and survey activities will continue through spring and summer with anticipated design completion by fall, 2026. This project is funded with the “Storm Sewer Main & Manhole Repair/Lining CIP” budget. Future storm sewer outfall and main repair recommendations will be included within the 2026-2027 CIP as well as future priorities within the next 6-year CIP outlook. Draft reports and recommendations were presented to village staff for review. Final recommendations include Cure in Place Pipe rehabilitation of the LM#1 outfall. Conceptual reports and recommendations were presented to the homeowners on 10/2/26 who are directly impacted with construction activities to gain their input prior to presenting final recommendations to the Public Works Committee. Village staff and consultants are starting to draft both temporary construction easements and permanent utility easements as part of the project scope. Watermain/LSL Replacement: • Project Budget: $4,610,000 • Current Phase: Design • Engineer/Contract: Clark Dietz/$276,775 • Design Completion: November 2026 • Contractor/Contract: TBD • Target Completion: 2027 Project Overview: The Village is responsible for the management of 47 miles of watermain with 86% of all watermains determined to be 80 years or older. The life cycle of a watermain is 80 - 100 years. There is a need to increase the replacement rate of ageing mains within the next 40 years. As 18 | P a g e part of this goal, the Village will undergo a minimum of 1-mile of watermain replacement annually which will also replace public and private lead service lines (LSL) within the project area. The watermain and lead service line replacement will allow the Village to comply with EPA's Lead and Copper Rule Improvements (LCRI). In addition to the proposed watermain/LSL design/construction activities, storm sewer and sanitary sewer inspections will be completed by village staff and engineers during design to determine if additional repairs and/or improvements should be incorporated within the project scope. This will also assist with managing these project areas holistically to be proactive with necessary utility maintenance. After examining these factors, the Village has approved the 2026-2026 watermain & LSL project areas on N Hollywood Avenue, from E Henry Clay Street to E Hampton Road, and N Shoreland Avenue, from 6135 N Shoreland Ave to E Lakeview Avenue. This project will also include an estimated 145 lead service line replacements. Bidding is scheduled to occur in December, 2026. Design is currently at 90%. A planned Public Information Meeting occurred on 9/24/26 with residents located within the project area. The overall feedback was positive, and residents were engaged with questions and given feedback and contacts to better serve them during construction. Residents can find project updates under the new watermain/LSL construction webpage: https://storymaps.arcgis.com/stories/b60931c8dd74439f8d9026653b3c184c A new Public facing dashboard was completed for all residents to quickly determine their service line material. Refer to link to the new water service line dashboard: https://v- whitefishbay.maps.arcgis.com/apps/dashboards/30c445a5df784e91920de7d277c38eeb# Project plans and design were submitted and approved by the DNR. Village staff applied for the Safe Drinking Water Loan Program (SDWLP) funding for a low interest loan for the watermain and public service line as well as the lead service line (Public & Private). On October 22, 2026, the DNR released the SDWLP Lead Service Line Replacement Funding List, in which Whitefish Bay did not receive any of its requested funding. Funding was prioritized using the Priority Evaluation and Ranking Formula (PERF), which considers factors such as the number of lead service lines, income levels, population under age five, lead sampling results, system optimization, and whether the project will eliminate all remaining lead service lines. Higher scores increase the likelihood of funding, with Whitefish Bay receiving a score of 72 compared to the median of 93. DNR has postponed implementation of the Environmental Loans Process Improvements (ELPI) until SFY 2029, maintaining the existing application process for SFY 2028 and extending the ITA/PERF submission deadline to January 15, 2027. This is unlikely to impact Whitefish Bay’s standing for SFY 2028 funding, as the existing ranking criteria will remain unchanged.

Source: Village of Whitefish Bay website. First collected Nov 9, 2026.