RecordWell Data

November 10, 2026 Plan Packet

City of Burlington · Racine County · meeting of Nov 10, 2026 · Agenda packets

Open the original document More from City of Burlington

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

PLAN COMMISSION AGENDA Tuesday, November 10, 2026 at 6:30 p.m. Common Council Chambers | 224 East Jefferson Street www.burlington-wi.gov Or Join via Zoom: https://us02web.zoom.us/s/82127844977?pwd=ZC84QWt4Z0tFL1hGKzRMUmQ2Mm5QZz09 Webinar ID: 821 2784 4977 | Password: 441655 Telephone Dial: US: (312) 626-6799 Mayor Jon Schultz, Chairman Shad Branen, Aldermanic Representative Bill Smitz, Aldermanic Representative Jenny Amborn, Commissioner Robert Kordus, Commissioner Brad Lois, Commissioner Karl McKillip, Commissioner 1. CALL TO ORDER / ROLL CALL 2. APPROVAL OF MINUTES A. To approve the October 13, 2026 Plan Commission Meeting Minutes. 3. LETTERS AND COMMUNICATIONS: None 4. CITIZEN COMMENTS: Comments are limited to three (3) minutes; must address items not listed on the agenda; are limited to issues that have an impact on the City of Burlington, and that the Plan Commission may address at a future meeting. An exception to the three (3) minute limit may be made at the discretion of the mayor. The mayor may place time limits on individual comments as he or she deems necessary. 5. OLD BUSINESS: None 6. NEW BUSINESS A. Continuation of a Public Hearing and Consideration of a Conditional Use Permit located at 7148 McHenry Street for use as a sand and gravel quarry, subject to The Lakota Group's memorandum to the Plan Commission. 7. ADJOURNMENT 1 of 60 Note: If you are disabled and have accessibility needs or need information interpreted for you, please call the City Clerk’s Office at 262-342-1161 at least 24 hours prior to the meeting. 2 of 60 PLAN COMMISSION ITEM NUMBER 2A DATE: November 10, 2026 SUBJECT: To approve the October 13, 2026 Plan Commission Meeting Minutes. SUBMITTED BY: Kristine Anderson, Administrative Assistant PROJECT/SCOPE: The attached minutes are from the October 13, 2026 Plan Commission meeting. ZONING: N/A TIMING/IMPLEMENTATION: This item is scheduled for final consideration at the November 10, 2026 Plan Commission meeting. Attachments Plan Minutes 3 of 60 PLAN COMMISSION MINUTES Jon Schultz, Mayor Tuesday, October 13, 2026 1. CALL TO ORDER / ROLL CALL Mayor Jon Schultz called the Plan Commission meeting to order at 6:30 pm. Roll call: Aldermen Shad Branen and Bill Smitz; Commissioners Jenny Amborn; Robert Kordus; Brad Lois; and Karl McKillip were present. Also present, Megan Watkins, Assistant City Administrator/Zoning Administrator; Andy Cross, City Planner; and Ronnie Mason, Fire Inspector. 2. APPROVAL OF MINUTES A. Commissioner McKillip moved, and Commission Lois seconded to approve the minutes of September 8, 2026. All were in favor and the motion carried. 3. LETTERS AND COMMUNICATIONS: None 4. CITIZEN COMMENTS: None 5. OLD BUSINESS A. Consideration and recommendation to the Common Council of a Certified Survey Map (CSM) for property located at 2281 Browns Lake Drive to subdivide the rear lot, subject to The Lakota Group's and Kapur & Associates' memorandums to the Plan Commission. This item was tabled pending review of the maintenance agreement. Mayor Schultz opened this item for further discussion. Commissioner Lois stated that he had spoken with John Hotvedt, general counsel for Bear Real Estate Group, who authored the maintenance agreement and that it made sense to create a new lot. Alderman Branen asked for more details regarding the agreement. Commissioner Lois explained that when Bear Real Estate Group developed the subdivision and owned the monastery property, they petitioned for a rezone while considering apartments on the site. As part of the subdivision construction, the developer created a maintenance agreement covering the entire area to protect and preserve it. Commissioner Lois stated that his primary concern at the previous meeting had been the creation of a new parcel zoned for multifamily use, but knowing the maintenance agreement runs in perpetuity relieved that concern. Commissioner Lois further clarified that the maintenance agreement specifically prohibits the construction of new buildings on the parcel, while permitting the maintenance, addition, and replacement of religious artifacts and features in the grotto area. 4 of 60 religious artifacts and features in the grotto area. Alderman Branen asked whether the maintenance agreement would supersede potential development given the multifamily zoning, and Commissioner Lois confirmed that it does. Commissioner Lois moved, and Commissioner McKillip seconded to recommend approval of the Certified Survey Map to subdivide the rear parcel, subject to The Lakota Group's and Kapur & Associates' memorandums. All were in favor and the motion carried.   6. NEW BUSINESS   A. Public Hearing and Consideration of a Conditional Use Permit located at 656 McHenry Street, subject to The Lakota Group's memorandum to the Plan Commission. Mayor Jon Schultz opened the Public Hearing at 6:35 PM. Andy Cross, City Planner, presented a request for a Conditional Use Permit for a U-Haul truck rental facility at the Quick Mart Mobile gas station, a 2.5-acre property. The property owner is working with U-Haul to store rental trucks on spare space on the site. The site plan shows four trucks of varying sizes, with two displayed prominently along McHenry Street and two at the rear. Mr. Cross stated the site has ample customer parking and that staff had no off-street parking concerns. Staff recommended one condition, limiting the number of vehicles to four as shown on the plan. Any expansion would require the applicant to return to the Commission to amend the permit. Mr. Cross added that no signage was part of the request, and any signage request would go through a separate permit process. Alderman Branen asked why the cap was four. Mr. Cross replied that it reflected the applicant's petition. In response to further questions, Megan Watkins, Assistant City Administrator/Zoning Administrator, stated that the applicant does not currently have trucks on the property and had applied after receiving a violation notice. Ms. Watkins mentioned that the BP station is allowed two trucks and the Pine Street/Market Street location is allowed three. Alderman Branen questioned how the number of trucks is controlled. Maxwell Milison, representing U-Haul, explained that U-Haul's system tracks equipment at each location. Once a location nears the cap, drop-offs are flagged, and drop-offs are turned off when the limit is reached. Alderman Smitz asked about truck size restrictions. Mr. Cross replied that size had been a concern at smaller, constrained sites, but it is less of a concern at this large site. Mr. Cross nonetheless advised the owner to avoid limiting site navigability. Ronnie Mason, Fire Inspector, raised a fire-safety concern about a hydrant near the northwest corner of the property on McHenry Street. Mr. Mason explained that fire apparatus uses that hydrant to fill tenders during major fires in the Town of Burlington and loops through the parking lot to avoid turning around on McHenry Street. Mr. Milison stated that the largest vehicle displayed at the front would be a 15-foot truck. Mr. Cross recommended an additional condition limiting trucks parked along the west property line to 15 feet in length, and Mr. Milison confirmed this was satisfactory. Commissioner Lois moved, and Commissioner Amborn seconded to close the Public Hearing at 6:43 pm. All were in favor and the motion carried. Alderman Branen moved, and Alderman Smitz seconded to approve the Conditional Use Permit for U-Haul truck rentals, subject to the conditions that the total number of vehicles be limited to 5 of 60 four and that the space by the fire hydrant on the west side be limited to a vehicle of no more than 15 feet in length. All were in favor and the motion carried.   B. Public Hearing and Consideration of a Conditional Use Permit and Site Plan application located at 950 Milwaukee Avenue, subject to The Lakota Group's and Kapur & Associates' memorandum to the Plan Commission. Mayor Schultz opened the Public Hearing at 6:45 PM. Commissioner Lois recused himself since he was the broker on the transaction. Commissioner McKillip also recused himself because of an affiliation with the matter. Both left the table and sat in the audience. Mr. Cross presented a drive-through-only Dunkin' Donuts of just over 1,000 square feet with no indoor seating. The Conditional Use Permit is for the drive-through itself, which lets the Commission review circulation and negative impacts on adjacent properties. The plan provides vehicle queuing well in excess of the seven required by code. It also provides a pass-through lane, so vehicles can enter and exit without joining the drive-through lane. The site is an infill property between an automobile service business to the south and the Pizza Ranch restaurant. Access is from a private frontage road on Milwaukee Avenue, which is covered by a recorded access easement. The rear of the property is at a lower elevation and will remain unimproved. Mr. Cross explained that the building is clad and hardi-board which carries heavy Dunkin' branding and has a blacked-out door and windows on the Milwaukee Avenue elevation. A landscaping plan was included. Mr. Cross stated that the signage had not been reviewed for code compliance, would not be approved at this meeting, and must go through a separate sign permit process. Mr. Cross identified two code conflicts in the original plan. The parking lot was built to the property line without the required 8-foot setback for lots with more than five vehicle spaces. Also, the 11-space row on the south line lacked a required tree island. The architect submitted revised plans at the meeting that address both points. Staff had not yet reviewed them, and the landscape plan will need revision to show buffering along the setback. Mr. Cross stressed that the Commission was under no obligation to approve plans it was seeing for the first time. Regarding parking, Mr. Cross explained that the code sets no standard for drive-through-only coffee use, so the Commission designates the requirement on staff's recommendation. The original plan showed 15 spaces. The revised plan shows nine spaces plus a loading space, which staff considered adequate given a maximum of five or six staff members on site and no indoor dining. Mr. Cross noted that the applicant had submitted a narrative supporting that nine spaces are sufficient for the business operation. Mr. Cross suggested that the grass area at the rear should not be used for outdoor seating, given the limited parking. Alderman Branen asked how the two pickup windows work. Dino Kellikidis, owner's representative, explained that the first window serves orders that can be paid for and picked up immediately. Customers with larger orders are directed to pull up to the second window, where an already-paid order is handed off. The extra parking spaces beyond staff needs are for owners and Dunkin' corporate representatives conducting internal checks, not for customers. Alderman Branen asked how long construction would take and if the property was already acquired. Mr. Kellikidis responded that construction and opening would take seven to eight months from permitting, which is anticipated in March or April. The property will be acquired after tonight's approval. 6 of 60 Commissioner Amborn moved, and Commissioner Kordus seconded to close the Public Hearing at 7:00 pm. All were in favor and the motion carried. Alderman Branen questioned if the revision could be approved at staff level. Mr. Cross replied yes, and the lighting and parking requirements are good. Mr. Cross added that the parking requirements with nine spaces proposed should be part of the motion. Mr. Mason stated that he glanced at the plans and it looked good. Commissioner Kordus moved, and Alderman Smitz seconded to approve the Conditional Use Permit and Site Plan based on the revised plans submitted at the October 13, 2026 meeting with the consideration of designating nine parking spaces, subject to staff's final review and approval of the submitted site plan, and noting that signage is not approved as part of this action and shall be subject to a separate sign permitting process. All were in favor and the motion carried. Mayor Schultz announced that Commissioners Lois and McKilliip rejoined the meeting. C. Public Hearing and Consideration of a Conditional Use Permit located at 7148 McHenry Street, subject to The Lakota Group's memorandum to the Plan Commission. Mayor Schultz opened the Public Hearing at 7:05 PM. Commissioner Kordus recused himself and sat in the audience. Mr. Cross presented a request for a Conditional Use Permit for sand and gravel quarrying on an approximately 164-acre tract of land. The property was recently annexed into the city and had previously operated under a 2020 Racine County Conditional Use Permit with 41 conditions. Staff carried over the 33 conditions relating to operations, nuisances, and inspections. Eight conditions were omitted because they were regarding county fees and administrative actions that do not fit the city's framework. The property is zoned Q-1, in which all uses are conditional. Mr. Cross clarified that the proposed hours of operation are 7:00 am to 5:00 pm, Monday through Friday and 7:00 am to noon on Saturday, with no Sunday operations. These hours appear on page 2 of the applicant's narrative and should be corrected on the application form. Robert Kordus, owner, confirmed the hours. Alderman Smitz noted that the narrative allows maintenance and repairs outside those hours. Mr. Kordus explained that this allows mechanics and employees to repair equipment such as a generator or crusher after 5:00 pm so that it is ready by 7:00 am. Mr. Cross noted that the application lacked a site plan and a lighting plan. A site plan was submitted in the past week and is in the packet, but staff had not reviewed it. It shows structures not mentioned in the application, including a single-family residence. Mr. Kordus explained that two single-family houses stand outside the mining area and existed when the land was purchased. One is occupied and one is vacant. A barn and a smaller barn are not used for the business. There is also a portable 8 x 8-foot wooden scale house and two old fieldstone well houses. Mr. Kordus also stated that there is no exterior lighting for the mining operation, only residential lights and motion lights for security cameras. Mr. Cross noted that the phasing plan in the application shows the quarry being extracted and reclaimed in phases over 20 to 25 years. Mr. Cross stated that he preferred time to complete a formal review and report to the Commission. In response to a question from Mayor Schultz, Mr. Cross stated that the quarry may continue to operate under the previous conditions until the Commission acts. Mr. Cross explained that the operation was allowed to continue through annexation, with the understanding that the owner 7 of 60 operation was allowed to continue through annexation, with the understanding that the owner would apply for a city permit. The Commission asked about past complaints. Mayor Schultz said the county had documented about four complaints. These concerned noise and engine braking, contamination, and gravel tracked onto the highway during a rain event. Ms. Watkins stated these matters are addressed in the conditions, which are consistent with those of other quarries in the city. Mr. Cross commented that condition 28 requires compliance with the zoning code, including nuisance provisions. Condition 31 requires Commission approval of site plan changes, and violations can result in revocation. Mr. Cross said the city has no standing requirement for periodic renewal, though a condition for periodic review could be imposed. Ms. Watkins noted that a return review has been used in the past for new or intensive uses. Ms. Watkins reported that the City Administrator, City Engineer, Fire Chief, police, and herself visited the site that day, found it quiet and clean, and took baseline photos. Mayor Schultz said he had no interest in relaxing the county's conditions. Mr. Mason asked about inspectable structures for later reference. Carina Walters, City Administrator, asked that residents submit time-stamped photos and audio or video with complaints so that staff can act on data collected. During the public hearing, the Commission heard the following comments: Paul Thompson lives in Walworth County near the county line and has lived in the area since 1965. Mr. Thompson said his family previously owned the property. Mr. Thompson stated neither he nor the neighbors on Thompson Road have complaints, since occasional equipment noise "is progress". Michael Warren, 7220 McHenry Street, thanked the Commission for retaining the county's conditions. Mr. Warren was concerned the operator may later seek to expand, for example, by moving an asphalt plant onto the site. Mr. Warren said he emailed a complaint about repeated engine braking on Saturday and that trucks were operating until about 1:00 pm, past the noon limit, and trucks starting before 7 am. Mr. Warren questioned the expectation that residents would document every instance and suggested the city monitor the site itself. Mr. Warren asked whether the driveway was annexed, and Ms. Watkins confirmed that it was. Mr. Warren urged the city to be ready to enforce its ordinance against engine braking on city property. Marshall Newholm, 7626 McKinney Street, reported numerous complaints. Mr. Newholm stated runoff from the quarry driveway and parking areas drains onto his land and affects his foliage and oak trees. Mr. Newholm said the 100-foot setback and a 2-to-1 berm slope are not adequate and asked that the operation move back to the tree line. Mr. Newholm also reported trucks speeding down the driveway. Commissioner McKillip moved, and Commissioner Amborn seconded to close the Public Hearing at 7:44 pm. All were in favor and the motion carried. Mayor Schultz recommended tabling the item because of the number of steps staff and the applicant must complete, including the site plan, lighting plan, and staff review. Mr. Cross proposed continuing the item to the November 10th Plan Commission agenda, stating that staff would communicate deadlines promptly to the applicant. The Commission preferred a specific date over an indefinite tabling. Commissioner McKillip moved, and Alderman Smitz seconded to continue discussions for the Conditional Use Permit to the November 10, 2026 Plan Commission meeting. All were in favor and the motion carried. 7. ADJOURNMENT 8 of 60 7. ADJOURNMENT Commissioner Lois moved, and Alderman Smitz seconded to adjourn the meeting at 7:46 pm. All were in favor and the motion carried. Minutes respectfully submitted by: Kristine Anderson Administrative Assistant City of Burlington 9 of 60 PLAN COMMISSION ITEM NUMBER 6A DATE: November 10, 2026 SUBJECT: Continuation of a Public Hearing and Consideration of a Conditional Use Permit located at 7148 McHenry Street for use as a sand and gravel quarry. SUBMITTED BY: Andy Cross, The Lakota Group, City Planner PROJECT/SCOPE: A continuation of a Public Hearing and Consideration of a Conditional Use Permit from Robert Kordus of Asphalt Contractors for property located at 7148 McHenry Street for a sand and gravel quarry. A few items were pending from the October 13, 2026 Plan Commission meeting, such as a Site Plan indicating where buildings are on the property, lighting plan, and staff review. Please see the November 10, 2026 memorandum from The Lakota Group for an update on the outstanding items. Please see the recap of the original submittal below: A 164-acre tract of land was recently annexed into the City of Burlington at the property owner's request. Located south of Burlington on McHenry Street, the land is used for sand and gravel quarrying by Asphalt Contractors, Inc. Formerly in the Town of Burlington, the site received a Conditional Use Permit from Racine County in 2020 to operate the quarrying business. Now that the property has been annexed, a Conditional Use Permit (CUP) from the City of Burlington will be required to continue operation. The site is comprised of two parcels, each about 80 acres in area. There are similar quarrying and extraction land uses on nearby tracts of land. The phasing plan for extraction operations and a reclamation plan that describes how the land will be "reclaimed" and remediated after extraction operations are complete have been submitted, which are required. Racine County issued a CUP for this operation in 2020. It has been approved every two years since then, and includes a list of 41 conditions the business must comply with. The Racine County permit is no longer valid, as the property is now under the City of Burlington's zoning jurisdiction. However, many of the conditions remain relevant and should be carried into any Conditional Use Permit approved by the City of Burlington, which is listed in The Lakota Group's memorandum dated October 13, 2026, pages 3–5. The sand and gravel quarrying operation is an appropriate land use and is consistent with the intent of the Q-1, Quarrying / Extractive zoning district. ZONING: The property is zoned Q-1, Quarrying and Extractive District. TIMING/IMPLEMENTATION: This item is for final consideration at the November 10, 2026 Plan Commission meeting. Attachments Lakota Report Attachment 1_Lakota October 2026 Report Conditional Use Permit Application Residential Units Narrative Site Plan Reclamation Plan 10 of 60 PLAN COMMISSION MEMORANDUM TO: PLAN COMMISSION, City of Burlington Megan Watkins, Assistant City Administrator/Zoning Administrator City of Burlington FROM: Andy Cross, AICP, Senior Planner, The Lakota Group DATE: November 10, 2026 SUBJECT: Conditional Use Permit for Sand & Gravel Quarrying – Continued from 10/13/26 ADDRESS: 7148 McHenry Street ZONING: Q-1 Quarrying and Extractive District APPLICANT: Asphalt Contractors, Inc., Union Grove, WI Application Summary A 164-acre tract of land was recently annexed into the City of Burlington at the property owner’s request. Located south of Burlington on McHenry Street, the land is used for sand and gravel quarrying by Asphalt Contractors, Inc. Formerly in the Town of Burlington, the site received a Conditional Use Permit from Racine County in 2020 to operate the quarrying business. Now that the property has been annexed, a Conditional Use Permit from the City of Burlington will be required to continue operation. The zoning map in Figure 1 shows the property in a red outline at the bottom of the image. Properties to the north are also used for quarrying and extraction. They share the Q-1 zoning district identified in the gray color. Previous Consideration Figure 1: Zoning Map Showing Newly- Annexed Site 11 of 60 Page 2 The Plan Commission opened the public hearing for this item at the October 13, 2026 meeting. Following testimony from the public and discussion with the applicant, the Commission voted to continue the hearing to allow time for the following: 1) Submittal of a Site Plan for the quarry operation 2) Submittal of a Lighting Plan 3) Information about residential units on the property Staff have received additional documentation from the applicant. Details and analysis are provided below. Lighting Plan There is no exterior lighting at the quarry associated with the business operations. No lighting plan is required. If exterior lighting is required in the future, proper documentation will be submitted as part of the building permit process. Site Plan The applicants provided a 13-page plan set that includes a site plan, grading plans, phasing plan for the quarry, and other information. The materials are dated 2020 and the Commission may wish to inquire if anything substantive has changed since these plans were originally created. The Site Plan appears on pages 5 and 6 in the plan set. Key features identified on the Plan include:  Two existing houses o One is shown in the northeast corner of the property, the other in the southwest corner o Both are in undisturbed areas where quarrying and extraction will not take place  3-acre stockpile area  Two ponds  Wetland area  Truck Scale  Wash pond The plan notes that the stockpile area and wash pond will relocate as extraction work moves with each phase. Phasing Plan Page 7 of the plan set is a Phasing Plan identifying ten areas where extraction will take place on the property. Work begins on the north end of the site and progresses southward. Residential Structures 12 of 60 Page 3 Documentation provided by the applicants indicates there are three residential structures on the property: 1) Farmhouse duplex (2 units) 2) Apartment building (unit count undetermined) a. Based on the documentation, the Apartment Building appears to be located close to the Farmhouse duplex. It is not identified on the Site Plan. 3) Single-family Ranch house (1 unit) The Farmhouse duplex building is fully-occupied and a photo is included in the documentation. Operators of the quarry maintain the property and intend to continue its operation as an established residence. Application materials indicate the Apartment Building was formerly a duplex and is undergoing renovation currently. No plans or building permits have been submitted to the City at this point. The Single-Family Ranch house was constructed in the 1990’s and was occupied when the applicants took control of the quarry property. While a photo is included in the documentation submitted by the applicant, a note indicates the “enhanced image is illustrative” and conditions should be verified on site. Residential land uses are not permitted in the Q-1 Quarrying and Extractive Zoning District. The existing structures may continue to operate as legal non-conforming land uses. The Conditional Use Permit should acknowledge any residential structures on the property and include conditions on their operation and expansion. Existing Conditional Use Permit & Conditions The Commission may recall that the previous Conditional Use Permit issued for the quarry by Racine County included a list of 41 conditions the business needed to comply with. 33 of these were carried over as conditions recommended by staff for the current Conditional Use Permit by the City of Burlington. For reference, they can be reviewed in Attachment 1, which is the complete staff report as presented at the October 13, 2026 public hearing. One condition was modified at the October 13 meeting relating to hours of operation. It now reads as follows: - The permitted hours of operation for this facility are 7:00 am to 5:00 pm Monday through Friday and 7:00 AM to 12:00 PM on Saturdays. No operations will take place on Sunday. All other conditions remain the same. As noted at the previous public hearing, the applicant complied with all these conditions when issued the Conditional Use Permit from Racine County and has indicated that compliance will continue under the City of Burlington’s Permit. Recommended Conditions 13 of 60 Page 4 1) Staff have identified the conditions in place under the operation’s previous Conditional Use Permit with Racine County. These should be carried over to the City of Burlington’s Conditional Use Permit. 2) The Commission may wish to have the Site Plan revised to reflect the location of all three residential properties identified in the new materials submitted by the applicants, as well as any other substantive changes since the Site Plan was drawn in 2020. 3) The Commission is asked to consider conditions relating the residential land uses on the quarry property. At a minimum, the Conditional Use Permit (CUP) should acknowledge them, allow their continued use (if appropriate), and clarify that these legal non- conforming land uses cannot expand without amending the CUP. Staff Recommendation & Findings Staff recommends the Plan Commission discuss and deliberate on the proposed Conditional Use Permit and reference the following findings: A) The sand and gravel quarrying operation as proposed by the applicant in the application dated 9/4/26, is an appropriate land use at the proposed location at 7148 McHenry Street and is in accordance with the purpose and intent of the Zoning Code. B) The proposed land use is consistent with the intent of the Q-1 Quarrying / Extractive zoning district because this is continuation of an existing quarry, provides maximum protection to the natural environment, and provides for the restoration of the area in a manner that will not deteriorate the natural environment when operations cease. SAMPLE MOTIONS These are provided for the Commission’s reference to assist in the deliberation and discussion on this item. They are not intended to act as a staff recommendation or suggest a specific course of action. These motions can be modified as needed to accurately address the Commission’s preferred actions on this application.  “I make a motion to approve the Conditional Use Permit to allow a “sand and gravel quarrying” operation at 7148 McHenry Street consistent with the application dated 9/4/2026.” o “with the following conditions…”  “I make a motion to continue the discussion on the Conditional Use Permit for 7148 McHenry Street to the next agenda of the Plan Commission.” 14 of 60 Attachment 1 - Staff Report from 10/13/26 Plan Commission Meeting - 15 of 60 73 16 of 60 74 17 of 60 Recommended Conditions of Approval from the Racine County CUP: 1. Failure to comply with the terms and conditions stated herein could result in the issuance of citation(s) and/or revocation of this permit. 2. These conditions bind and are applicable to the Property Owner, Applicant, and agents of the Property Owner (collectively referred to herein as "Property Owner" - Asphalt Contractors) with respect to the uses on the Property. 3. This extraction operation and reclamation must be conducted in accordance with the previously approved plans and amendments. 4. The permitted hours of operation for this facility are 7:00 am to 4:00 pm Monday through Friday. Maintenance and repairs may occur outside of the aforementioned operating hours. 5. Signage shall be installed around the property warning of the mining activity and be spaced no more than 250-feet apart. 6. Noise levels measured at the property lines must never exceed 68 decibels. 7. The hazardous fluid storage areas must be surrounded by a berm as specified in application submittal material under the “SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN.” Said berm must be of sufficient height, and width to hold and contain the capacity of all hazardous fluids located in said area. The containment berm shall be lined with an approved impermeable surface. 8. The project must continue in accordance with the controlling restoration plan. All stockpiles of overburden and topsoil must be protected from soil erosion. Stockpiles must have side slopes of 2: 1 or flatter and must be seeded to prevent soil erosion. 9. Surface water runoff from the construction site must be contained within the constructed area and directed to the sediment ponds. Sediment or other contaminants must not enter the wetlands/floodplain. All restoration work must comply with the controlling restoration plan. 10. All overburden and topsoil from this site must remain on site and be used for restoration. A minimum of three (3) inches of topsoil should be spread over the finished restored land if there is adequate material. Finished side slopes of the restored areas must be 3:1 or flatter to maintain a vegetative condition. The temporary seeding of the stockpiles must be a mixture of grasses at a rate of five (5) pounds per 1,000 square feet of perennial rye grass, ten (10) pounds of smooth brome and ten (10) pounds of tall grass. These stockpiles must remain until used to restore the land being mined. 11. All areas restored must be graded in accordance· with the approved restoration plan, must be covered with a minimum of three (3) inches of topsoil, fertilized and permanently seeded o r sodded by September 15 of the same year in which the finished grading is completed. Should the finished grading be completed after September 15 all disturbed areas must be temporarily seeded and/or mulched immediately upon completion of the finished grading, with permanent seeding to be completed by June 15 of the following year. 12. The existing wetlands shall not be disturbed. Silt fence may be needed around the perimeter of the wetland to keep sediment from filling the wetland. 13. The owner is responsible for the control and/or cutting of noxious weeds in compliance with City of Burlington regulations. 14. No well is approved by this action. Such an additional water source will require the further review and approval by the City of Burlington. 15. The applicant shall continue the annual evaluation of monitoring data to identify actual groundwater conditions compared to those that are anticipated and provide copies of evaluation to the City of Burlington. In addition, the pit operator must investigate any reported problems with water supply wells 75 18 of 60 for grou ndwater uses within 1,000-feet of the quarry limits. If it is determined that the mining operation is responsible for a well problem, the well must be repaired or replaced as necessary by the pit operator provided the well is: a) Located within the well protection area (1,000 feet of the boundary of this quarry). b) The owner of an existing well allows the representatives of the pit operator to inspect and test the well prior to excavation; or c) The owner of any new well drilled during the excavation notify the applicant at the time of the drilling thereof and allows the applicant to inspect the same to determine its condition. 16. The washing pond(s) must be constructed in a manner that prevents any of the wash water from entering the wetlands. 17. Dust control must be established as detailed in the submitted “ FUGITIVE DUST CONTROL PLAN.” Airborne particulate matter shall not exceed Wisconsin State Administrative Code Regulations. 18. Access road must be 24 feet minimum width. Haul access road must be provided with a gate that can be locked whenever the quarry is not in operation. 19. The applicant is responsible for ensuring that all truck drivers strictly obey all posted speed limits and all traffic laws. This includes coming to a full stop before entering the public roadway. The quarry driveways shall have a speed limit of no more than 25 miles per hour. Should this office receive substantial complaints that such laws are being broken, the City of Burlington reserves the right to revoke this permit of noncompliance. 20. All haul roads throughout the entire pit must be maintained in an all -weather, dust free condition. When applying treatment to any access road surface, the pit operator must make every effort to avoid the spread of this treatment material onto the public roadway. Should such material and/or soil material be spread, carried, and\or spilled onto the public roadway, the pit operator must act to mitigate the problem. The haul roads must be provided with gates that can be locked whenever the quarry is not operation. 21. No "jake-braking" by haul trucks is allowed except under emergency circumstances. 22. No staging of trucks is allowed on CTH P and the 24-foot wide drive from CTH P to the entrance of the quarry. 23. No blasting is permitted on this property as part of this approval. No explosives shall be used or stored on this property. 24. The City of Burlington reserves the right to require a complete set of elevations, including bottom of pit grades, within 60 days’ notice. These elevations must be taken by a registered land surveyor or a professional engineer. This operation shall not occur below the grades shown on the submitted restoration plan. 25. The final restoration of this site includes a ½-acre and a 10-acre freshwater pond. The ponds must comply with all applicable Wisconsin Department of Natural Resources and United States Army Corps of Engineers recommendations or requirements. The site operator must retain on the site an amount of topsoil and overburden that is an ample amount to cover all the disturbed area outside the ponds with a minimum of 6-inches of subsoil and a minimum of 6 inches of topsoil. The side slopes of the proposed pond must be sloped, covered with soil, and seeded to prevent excessive soil erosion until all phases of this quarry are completed. A 75-foot grassed buffer planted with prairie grasses or native plantings shall be established around the perimeter of the pond, with the remaining land put back in agricultural production. 76 19 of 60 26. Ample amoun ts of topsoil to complete reclamation as approved will remain on the site always. If it is determined by the City of Burlington that, at any time, the amount of topsoil on site is not sufficient to accomplish reclamation as approved, then the financial assurance will be adjusted to cover the deficiency. 27. The applicant must provide this office with an as-built survey when restoration is completed. 28. The applicant must comply with the provisions of Chapter 315 (Zoning Code) of the City of Burlington Municipal Code. 29. The applicant must allow City of Burlington employees full and unlimited access to the project site at a reasonable time to investigate the project’s construction, operation, or maintenance. 30. The applicant is responsible for obtaining all necessary federal, state, and local permits, approvals, and licenses. The applicant is required to comply with all applicable local, state, and federal regulations. 31. No additions, deletions, or changes may be made to the project, site plan, or these conditions without prior approval from the City of Burlington. All addition deletion, and/or change requests must be submitted to the City Administrator’s office in writing. 32. It is the property owner’s responsibility to inform any subsequent owner or operator of these conditions. 33. The applicant must furnish the necessary sureties which will enable the City to perform the restoration of the site in the event of default by the applicant as required in Section 315 -34(G)(2). The applicant complied with all these conditions when issued the Conditional Use Permit from Racine County and has indicated that compliance will continue under the City of Burlington’s Permit. Zoni ng Code & Land Use Analysis Section 315-34 of the Zoning Code establishes the Q-1 Quarrying / Extractive zoning district. The district is intended to “provide for the orderly continuation or restoration of existing quarries or other extractive and related operations and to provide for the location in approximate places of new extractive operations that provide maximum protection to the natural environment. This district further provides for the restoration of quarries in a manner that will not deteriorate the natural environment.” All land uses in the Q-1 zoning district are conditional and relate to nonmetallic mining, quarrying, and extraction of materials. “Sand and gravel quarrying” is identified in the list of allowable uses. Special Regulations Section 315-34 establishes two special regulations for quarrying / extractive land uses: 1) Conditional Use Permit Application with the following: a. Plat of survey of the proposed site and a description of operational methods b. List of equipment, machinery, and structures to be used c. Source, quantity, and disposition of water to be used d. Topographic map showing site contours, trees, and access roads e. Depth of all existing and proposed excavations f. Restoration Plan 77 20 of 60 2) Restoration Plan, fees, and sureties to complete the restoration plan if needed. The application materials provide much of this information. There is a detailed Reclamation (Restoration) Plan, a project narrative with information about the quarrying operation, and a phasing plan identifying where extraction activities will take place. Missing Items City staff are working with the applicant to provide two remaining items: 1) Plat of survey / Site plan identifying all structures on the site, setbacks, storage areas, parking areas, and other key features. 2) Lighting Plan a. This is required by Section 315-34 and must identify all exterior lighting fixtures on the property, including information on the specific luminaires, mounting heights, and fixture locations. Conditional Uses Section 315-130 of the Zoning Code establishes standards for Conditional Use Permits. It allows the Plan Commission to authorize the Zoning Administrator to issue a Conditional Use Permit provided the following: 1) The proposed land use is in “accordance with the purpose and intent of this chapter” and 2) The proposed use is “found to be not hazardous, harmful, offensive, or otherwise adverse to the environment or the value of the neighborhood or the community.” The purpose and intent of the Zoning Code, established in Sections 315-3 and 315-4, is to “promote the comfort, health, safety, morals, prosperity, aesthetics, and general welfare of the City of Burlington, Wisconsin” and “regulate and restrict the use of all structures, lands and waters” by placing controls on density, parking and loading, lot coverage and building heights, land uses, and design, among other things. Recommended Conditions Staff have identified the conditions in place under the operation’s previous Conditional Use Permit with Racine County. These should be carried over to the City of Burlington’s Conditional Use Permit. Staff also asks the Commission to require the submittal of the missing application materials identified in this staff report. Staff Recommendation Staff recommends the Plan Commission discuss and deliberate on the proposed Conditional Use Permit and reference the following findings: 78 21 of 60 A) The sand and gravel quarrying operation as proposed by the applicant in the application dated 9/4/26, is an appropriate land use at the proposed location at 7148 McHenry Street and is in accordance with the purpose and intent of the Zoning Code. B) The proposed land use is consistent with the intent of the Q-1 Quarrying / Extractive zoning district because this is continuation of an existing quarry, provides maximum protection to the natural environment, and provides for the restoration of the area in a manner that will not deteriorate the natural environment when operations cease. SAMPLE MOTIONS These are provided for the Commission’s reference to assist in the deliberation and discussion on this item. They are not intended to act as a staff recommendation or suggest a specific course of action. These motions can be modified as needed to accurately address the Commission’s preferred actions on this application. • “I make a motion to approve the Conditional Use Permit to allow a “sand and gravel quarrying” operation at 7148 McHenry Street consistent with the application dated 9/4/2026.” o “with the following conditions…” • “I make a motion to continue the discussion on the Conditional Use Permit for 7148 McHenry Street to the next agenda of the Plan Commission.” 79 22 of 60 PLAN COMMISSION ITEM NUMBER 6C DATE: October 13, 2026 SUBJECT: Public Hearing and Consideration of a Conditional Use Permit located at 7148 McHenry Street. SUBMITTED BY: Andy Cross, The Lakota Group, City Planner PROJECT/SCOPE: A Public Hearing and Consideration of a Conditional Use Permit from Robert Kordus of Asphalt Contractors for property located at 7148 McHenry Street. A 164-acre tract of land was recently annexed into the City of Burlington at the property owner's request. Located south of Burlington on McHenry Street, the land is used for sand and gravel quarrying by Asphalt Contractors, Inc. Formerly in the Town of Burlington, the site received a Conditional Use Permit from Racine County in 2020 to operate the quarrying business. Now that the property has been annexed, a Conditional Use Permit (CUP) from the City of Burlington will be required to continue operation. The site is comprised of two parcels, each about 80 acres in area. There are similar quarrying and extraction land uses on nearby tracts of land. The phasing plan for extraction operations and a reclamation plan that describes how the land will be "reclaimed" and remediated after extraction operations are complete have been submitted, which are required. Racine County issued a CUP for this operation in 2020. It has been approved every two years since then, and includes a list of 41 conditions the business must comply with. The Racine County permit is no longer valid, as the property is now under the City of Burlington's zoning jurisdiction. However, many of the conditions remain relevant and should be carried into any Conditional Use Permit approved by the City of Burlington, which is listed in The Lakota Group's memorandum dated October 13, 2026, pages 3–5. The sand and gravel quarrying operation is an appropriate land use and is consistent with the intent of the Q-1, Quarrying / Extractive zoning district. Staff have identified the conditions in place under the operator's previous CUP with Racine County. These should be carried over to the City of Burlington's CUP. Staff also asks the Commission to require the submittal of the missing application materials. ZONING: The property is zoned Q-1, Quarrying and Extractive District. TIMING/IMPLEMENTATION: This item is for final consideration at the October 13, 2026 Plan Commission meeting. Attachments Lakota's memo Public Hearing Notice 7148 McHenry application/survey Gravel Pit property marking 72 23 of 60 THE PLAN COMMISSION IN AND FOR THE CITY OF BURLINGTON Notice of Hearing on Proposed Conditional Use Permit M-4, Manufacturing District TO WHOM IT MAY CONCERN: NOTICE is hereby given that the Plan Commission of the City of Burlington, Racine County, Wisconsin, will conduct a hearing to discuss the proposed Conditional Use Permit for: Owner: Asphalt Contractors Inc. – Robert Kordus Applicant: Asphalt Contractors Inc. Location: 7148 McHenry Street Zoning: M-4, Manufacturing District Use: To allow for non-metallic mining operations NOTICE IS FURTHER GIVEN that a hearing on the above-mentioned Conditional Use Permit will be held by the City Plan Commission via Zoom meetings. TUESDAY, OCTOBER 13, 2026 DURING THE MEETING OF THE PLAN COMMISSION SCHEDULED TO BEGIN AT 6:30 P.M. OR SHORTLY THEREAFTER This meeting will be conducted remotely at: Remote Meeting Log in information: Webinar link: https://zoom.us/join Webinar ID: 821 2784 4977 Password: 441655 Phone: (312) 626-6799 To consider the above Conditional Use Permit and to hear persons in support thereof or opposition thereto. CITY OF BURLINGTON PLAN COMMISSION Dated at Burlington, Wisconsin, 21st day of September, 2026. Diahnn Halbach, City Clerk Published in the Burlington Standard Press September 24th and October 1st, 2026 80 24 of 60 81 25 of 60 82 26 of 60 83 27 of 60 85 28 of 60 ..... /JIii/ii ASPHALT CONTRACTORS INC Grading-Paving-Sealing-Striping Tel (262)878-4678 Fax (262)878-5411 www.asphaltinc.com Narrative Proiect Description The proposal is to continue operating a sand and gravel operation on a former campground west of the Highway P and Fish Hatchery Road intersection. The existing paved driveway to the site does provide truck access to Highway P. The gravel mining will include removal of the soil overburden, crushing, screening, and stockpiling of sand gravel, trucking, and site reclamation. A primary use will be to make specialized crushed products unique to producing asphalt mixes. Operation Methods Refer to attached operation plan that shows the phased operatf ons and final reclamation. The entrance is asphalt and will be maintained asphalt to provide access to the street. The area for equipment storage and stockpiles has been established. Washing ponds are already in existence. Once sufficient room is available at the bottom of the pit, the existing washing ponds will be relocated. When there is enough room at the bottom of the pit, the washing ponds will be moved to the bottom of the pit. Silt removed from the ponds will be deposited into the finished slopes at the perimeter of the pit. During each phase topsoil and clay which averages two to three feet thick, will be placed in separate soil berms in various areas of the pit. Soil berms will also continue along the south and east side. As the phases are excavated, soil removed ahead of the excavation will be used to reclaim area·s in a previous phase that is shaped for reclamation. We are currently working in Phase Two (2) and applying to move into Phase Three (3). As the perimeter of the pit is excavated we will accept clean fill from outside sources to increase the depth of soil on the slopes to help stabilize the slope. There will be no concrete or asphalt recycling activities taking place on this property. We are currently monitoring the site to ensure that we are keeping the site free of trash and debris. Operations Equipment 1 86 29 of 60 87 30 of 60 88 31 of 60 89 32 of 60 90 33 of 60 PROPERTY RETENTION | RESIDENTIAL DOCUMENTATION Existing Residential Structures 7148 McHenry Street, Burlington, Wisconsin This exhibit summarizes the background, existing residential use, current tenancy information, planned retention, and maintenance of the three residential buildings identified by Asphalt Contractors, Inc. (ACI). Building location references and digitally enhanced exterior views are included on the following pages. PURPOSE OF REQUEST ACI proposes retaining the existing residences rather than demolishing them. According to ACI, the buildings were already used for residential tenancy when the property was purchased. Keeping them allows continued use of existing housing, including employee-family housing, and supports ongoing maintenance and reinvestment in the property instead of unnecessary demolition. RESIDENTIAL BUILDING SUMMARY SITE ID STRUCTURE UNITS PRESENT USE / STATUS B-01 Farmhouse duplex 2 Two employee households B-02 Apartment building 2* Renovation in progress B-03 Single-family ranch 1 Established rental use * The apartment building is described in ACI's source notes as a preexisting duplex. Its final approved unit layout and current occupancy should be confirmed. DOCUMENTATION NOTES Construction years: approximately 1940 for the farmhouse and apartment building; 1990s for the ranch, based on owner estimates, not verified records. Sale / tenancy: the materials describe past or ongoing rental use, but no sale plan or final post-renovation lease terms. Site plan: see the labeled aerial on page 2; no official plan provided. Images: edited for presentation; not current-condition documentation. EXISTING RESIDENTIAL STRUCTURES • OWNER-SUPPLIED BACKGROUND 1 / 5 34 of 60 ASPHALT CONTRACTORS, INC. 7148 MCHENRY STREET | BURLINGTON, WISCONSIN Exhibit A | Building Location Reference Building identifiers used throughout this exhibit are shown below. These aerial photographs are for location reference; they are not a boundary survey, scaled site plan, or confirmation of dwelling-unit approvals. EXISTING FARMSTEAD AERIAL B-02 B-01 RANCH AERIAL INSET B-03 SITE-PLAN LEGEND B-01 Farmhouse duplex Units F-1 and F-2 B-02 Apartment building A-1 and A-2; layout to confirm B-03 Single-family ranch Unit R-1 For the formal site-plan submission: mark these same building IDs and unit designations on the official scaled plan. Relative positions shown above should be checked against that plan before filing. EXISTING RESIDENTIAL STRUCTURES • OWNER-SUPPLIED BACKGROUND 2 / 5 35 of 60 ASPHALT CONTRACTORS, INC. 7148 MCHENRY STREET | BURLINGTON, WISCONSIN Farmhouse Duplex B-01 Existing two-unit residential building BUILDING FACTS APPROXIMATE CONSTRUCTION Circa 1940 (ACI estimate; not verified) EXISTING CONFIGURATION Two residential units; in place before ACI acquired the property TENANCY Two ACI employees and their respective families currently reside in the building SITE PLAN DESIGNATION B-01; separate unit labels F-1 and F-2 BACKGROUND AND REASON FOR RETENTION The farmhouse was already in residential duplex use when ACI acquired the property, with an established tenant history and mailing address information. ACI has continued this use. Retention preserves two established dwellings and housing currently used by employee families. ONGOING CONDITION AND MAINTENANCE ACI reports regular improvements to maintain the building as a rental. The building has an exterior stair and porch area visible in the photograph. Continued maintenance will address ordinary repairs, exterior upkeep, and tenant-related needs as they arise. DWELLING UNIT AND OCCUPANCY REFERENCE F-1 Employee household / family residence F-2 Employee household / family residence Occupant names, individual mailing designations, certificates and exact construction records were not supplied for this exhibit. EXISTING RESIDENTIAL STRUCTURES • OWNER-SUPPLIED BACKGROUND 3 / 5 36 of 60 ASPHALT CONTRACTORS, INC. 7148 MCHENRY STREET | BURLINGTON, WISCONSIN Apartment Building B-02 Existing residential building | renovation underway BUILDING FACTS APPROXIMATE CONSTRUCTION Circa 1940 (ACI estimate; not verified) PRIOR CONFIGURATION Described in ACI notes as a duplex with prior tenants and mailing address(es) CURRENT CONDITION / USE Renovations in progress; occupancy information not supplied SITE PLAN DESIGNATION B-02; A-1 / A-2 (to verify) BACKGROUND AND REASON FOR RETENTION ACI reports that this structure was established for residential use before its acquisition, rather than a newly proposed residential building. Keeping the structure would preserve an existing residential improvement while allowing renovations to be completed instead of removing the building. PROSPECTIVE TENANCY AND MAINTENANCE The property is currently undergoing renovation. ACI proposes retaining it for residential rental after the renovation; the final tenancy arrangements and any required municipal approvals remain to be confirmed. Ongoing upkeep would include the deck, access stairs, exterior, grounds, and ordinary repairs as needed. DWELLING UNIT AND OCCUPANCY REFERENCE A-1 Renovation underway; tenancy not yet documented A-2 Renovation underway; tenancy not yet documented The A-1/A-2 labels are identification placeholders, not verification of the number of lawful dwelling units. ACI should verify the approved layout and occupancy before submission. EXISTING RESIDENTIAL STRUCTURES • OWNER-SUPPLIED BACKGROUND 4 / 5 37 of 60 ASPHALT CONTRACTORS, INC. 7148 MCHENRY STREET | BURLINGTON, WISCONSIN Single-Family Ranch B-03 Existing single-family rental residence BUILDING FACTS APPROXIMATE CONSTRUCTION 1990s (ACI estimate; not verified) EXISTING CONFIGURATION Single-family house with attached garage RENTAL HISTORY Occupied by tenants before ACI purchased the property; ACI reports continued rental use SITE PLAN DESIGNATION B-03; Unit R-1 BACKGROUND AND REASON FOR RETENTION The ranch residence was already present, occupied, and associated with a mailing address when ACI acquired the property. ACI has maintained the house as a single-family rental. Retaining the home allows a longstanding residential use to continue and avoids removing an existing housing improvement. ONGOING CONDITION AND MAINTENANCE ACI reports making regular improvements as part of its rental-property maintenance. Future upkeep will address building components, the attached garage, driveway and surrounding grounds as needed. The enhanced image is illustrative; physical conditions should be verified on site. DWELLING UNIT AND OCCUPANCY REFERENCE R-1 Single-family rental; current tenant status to confirm No definitive build year, recent professional property-condition report, or individual tenancy documentation was supplied. These items should be provided if specifically required by the reviewing authority. EXISTING RESIDENTIAL STRUCTURES • OWNER-SUPPLIED BACKGROUND 5 / 5 38 of 60 39 of 60 40 of 60 41 of 60 42 of 60 43 of 60 44 of 60 45 of 60 46 of 60 47 of 60 48 of 60 49 of 60 50 of 60 51 of 60 52 of 60 53 of 60 54 of 60 55 of 60 56 of 60 57 of 60 58 of 60 59 of 60 60 of 60

Source: City of Burlington website. First collected Nov 9, 2026.