November 10, 2026 Plan Packet
City of Burlington · Racine County · meeting of Nov 10, 2026 · Agenda packets
Open the original document More from City of Burlington
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
PLAN COMMISSION AGENDA
Tuesday, November 10, 2026 at 6:30 p.m.
Common Council Chambers | 224 East Jefferson Street
www.burlington-wi.gov
Or Join via Zoom:
https://us02web.zoom.us/s/82127844977?pwd=ZC84QWt4Z0tFL1hGKzRMUmQ2Mm5QZz09
Webinar ID: 821 2784 4977 | Password: 441655
Telephone Dial: US: (312) 626-6799
Mayor Jon Schultz, Chairman
Shad Branen, Aldermanic Representative
Bill Smitz, Aldermanic Representative
Jenny Amborn, Commissioner
Robert Kordus, Commissioner
Brad Lois, Commissioner
Karl McKillip, Commissioner
1. CALL TO ORDER / ROLL CALL
2. APPROVAL OF MINUTES
A. To approve the October 13, 2026 Plan Commission Meeting Minutes.
3. LETTERS AND COMMUNICATIONS: None
4. CITIZEN COMMENTS:
Comments are limited to three (3) minutes; must address items not listed on the agenda; are
limited to issues that have an impact on the City of Burlington, and that the Plan Commission
may address at a future meeting. An exception to the three (3) minute limit may be made at the
discretion of the mayor. The mayor may place time limits on individual comments as he or she
deems necessary.
5. OLD BUSINESS: None
6. NEW BUSINESS
A. Continuation of a Public Hearing and Consideration of a Conditional Use Permit located at
7148 McHenry Street for use as a sand and gravel quarry, subject to The Lakota Group's
memorandum to the Plan Commission.
7. ADJOURNMENT
1 of 60
Note: If you are disabled and have accessibility needs or need information interpreted for you, please
call the City Clerk’s Office at 262-342-1161 at least 24 hours prior to the meeting.
2 of 60
PLAN COMMISSION ITEM NUMBER 2A
DATE: November 10, 2026
SUBJECT: To approve the October 13, 2026 Plan Commission Meeting Minutes.
SUBMITTED BY: Kristine Anderson, Administrative Assistant
PROJECT/SCOPE:
The attached minutes are from the October 13, 2026 Plan Commission meeting.
ZONING:
N/A
TIMING/IMPLEMENTATION:
This item is scheduled for final consideration at the November 10, 2026 Plan Commission meeting.
Attachments
Plan Minutes
3 of 60
PLAN COMMISSION MINUTES
Jon Schultz, Mayor
Tuesday, October 13, 2026
1. CALL TO ORDER / ROLL CALL
Mayor Jon Schultz called the Plan Commission meeting to order at 6:30 pm. Roll call: Aldermen
Shad Branen and Bill Smitz; Commissioners Jenny Amborn; Robert Kordus; Brad Lois; and Karl
McKillip were present. Also present, Megan Watkins, Assistant City Administrator/Zoning
Administrator; Andy Cross, City Planner; and Ronnie Mason, Fire Inspector.
2. APPROVAL OF MINUTES
A. Commissioner McKillip moved, and Commission Lois seconded to approve the minutes of
September 8, 2026.
All were in favor and the motion carried.
3. LETTERS AND COMMUNICATIONS: None
4. CITIZEN COMMENTS: None
5. OLD BUSINESS
A. Consideration and recommendation to the Common Council of a Certified Survey Map
(CSM) for property located at 2281 Browns Lake Drive to subdivide the rear lot, subject
to The Lakota Group's and Kapur & Associates' memorandums to the Plan Commission.
This item was tabled pending review of the maintenance agreement.
Mayor Schultz opened this item for further discussion.
Commissioner Lois stated that he had spoken with John Hotvedt, general counsel for Bear Real
Estate Group, who authored the maintenance agreement and that it made sense to create a
new lot.
Alderman Branen asked for more details regarding the agreement. Commissioner Lois
explained that when Bear Real Estate Group developed the subdivision and owned the
monastery property, they petitioned for a rezone while considering apartments on the site. As
part of the subdivision construction, the developer created a maintenance agreement covering
the entire area to protect and preserve it. Commissioner Lois stated that his primary concern at
the previous meeting had been the creation of a new parcel zoned for multifamily use, but
knowing the maintenance agreement runs in perpetuity relieved that concern. Commissioner
Lois further clarified that the maintenance agreement specifically prohibits the construction of
new buildings on the parcel, while permitting the maintenance, addition, and replacement of
religious artifacts and features in the grotto area.
4 of 60
religious artifacts and features in the grotto area.
Alderman Branen asked whether the maintenance agreement would supersede potential
development given the multifamily zoning, and Commissioner Lois confirmed that it does.
Commissioner Lois moved, and Commissioner McKillip seconded to recommend approval of the
Certified Survey Map to subdivide the rear parcel, subject to The Lakota Group's and Kapur &
Associates' memorandums.
All were in favor and the motion carried.
6. NEW BUSINESS
A. Public Hearing and Consideration of a Conditional Use Permit located at 656 McHenry
Street, subject to The Lakota Group's memorandum to the Plan Commission.
Mayor Jon Schultz opened the Public Hearing at 6:35 PM.
Andy Cross, City Planner, presented a request for a Conditional Use Permit for a U-Haul truck
rental facility at the Quick Mart Mobile gas station, a 2.5-acre property. The property owner is
working with U-Haul to store rental trucks on spare space on the site. The site plan shows four
trucks of varying sizes, with two displayed prominently along McHenry Street and two at the
rear. Mr. Cross stated the site has ample customer parking and that staff had no off-street
parking concerns. Staff recommended one condition, limiting the number of vehicles to four as
shown on the plan. Any expansion would require the applicant to return to the Commission to
amend the permit. Mr. Cross added that no signage was part of the request, and any signage
request would go through a separate permit process.
Alderman Branen asked why the cap was four. Mr. Cross replied that it reflected the applicant's
petition. In response to further questions, Megan Watkins, Assistant City Administrator/Zoning
Administrator, stated that the applicant does not currently have trucks on the property and had
applied after receiving a violation notice. Ms. Watkins mentioned that the BP station is allowed
two trucks and the Pine Street/Market Street location is allowed three.
Alderman Branen questioned how the number of trucks is controlled. Maxwell Milison,
representing U-Haul, explained that U-Haul's system tracks equipment at each location. Once a
location nears the cap, drop-offs are flagged, and drop-offs are turned off when the limit is
reached. Alderman Smitz asked about truck size restrictions. Mr. Cross replied that size had
been a concern at smaller, constrained sites, but it is less of a concern at this large site. Mr.
Cross nonetheless advised the owner to avoid limiting site navigability.
Ronnie Mason, Fire Inspector, raised a fire-safety concern about a hydrant near the northwest
corner of the property on McHenry Street. Mr. Mason explained that fire apparatus uses that
hydrant to fill tenders during major fires in the Town of Burlington and loops through the parking
lot to avoid turning around on McHenry Street. Mr. Milison stated that the largest vehicle
displayed at the front would be a 15-foot truck. Mr. Cross recommended an additional condition
limiting trucks parked along the west property line to 15 feet in length, and Mr. Milison confirmed
this was satisfactory.
Commissioner Lois moved, and Commissioner Amborn seconded to close the Public Hearing at
6:43 pm.
All were in favor and the motion carried.
Alderman Branen moved, and Alderman Smitz seconded to approve the Conditional Use Permit
for U-Haul truck rentals, subject to the conditions that the total number of vehicles be limited to
5 of 60
four and that the space by the fire hydrant on the west side be limited to a vehicle of no more
than 15 feet in length.
All were in favor and the motion carried.
B. Public Hearing and Consideration of a Conditional Use Permit and Site Plan application
located at 950 Milwaukee Avenue, subject to The Lakota Group's and Kapur &
Associates' memorandum to the Plan Commission.
Mayor Schultz opened the Public Hearing at 6:45 PM.
Commissioner Lois recused himself since he was the broker on the transaction.
Commissioner McKillip also recused himself because of an affiliation with the matter. Both left
the table and sat in the audience.
Mr. Cross presented a drive-through-only Dunkin' Donuts of just over 1,000 square feet with no
indoor seating. The Conditional Use Permit is for the drive-through itself, which lets the
Commission review circulation and negative impacts on adjacent properties. The plan provides
vehicle queuing well in excess of the seven required by code. It also provides a pass-through
lane, so vehicles can enter and exit without joining the drive-through lane. The site is an infill
property between an automobile service business to the south and the Pizza Ranch restaurant.
Access is from a private frontage road on Milwaukee Avenue, which is covered by a recorded
access easement. The rear of the property is at a lower elevation and will remain unimproved.
Mr. Cross explained that the building is clad and hardi-board which carries heavy Dunkin'
branding and has a blacked-out door and windows on the Milwaukee Avenue elevation. A
landscaping plan was included. Mr. Cross stated that the signage had not been reviewed for
code compliance, would not be approved at this meeting, and must go through a separate sign
permit process. Mr. Cross identified two code conflicts in the original plan. The parking lot was
built to the property line without the required 8-foot setback for lots with more than five vehicle
spaces. Also, the 11-space row on the south line lacked a required tree island. The architect
submitted revised plans at the meeting that address both points. Staff had not yet reviewed
them, and the landscape plan will need revision to show buffering along the setback. Mr. Cross
stressed that the Commission was under no obligation to approve plans it was seeing for the
first time.
Regarding parking, Mr. Cross explained that the code sets no standard for drive-through-only
coffee use, so the Commission designates the requirement on staff's recommendation. The
original plan showed 15 spaces. The revised plan shows nine spaces plus a loading space,
which staff considered adequate given a maximum of five or six staff members on site and no
indoor dining. Mr. Cross noted that the applicant had submitted a narrative supporting that nine
spaces are sufficient for the business operation. Mr. Cross suggested that the grass area at the
rear should not be used for outdoor seating, given the limited parking.
Alderman Branen asked how the two pickup windows work. Dino Kellikidis, owner's
representative, explained that the first window serves orders that can be paid for and picked up
immediately. Customers with larger orders are directed to pull up to the second window, where
an already-paid order is handed off. The extra parking spaces beyond staff needs are for
owners and Dunkin' corporate representatives conducting internal checks, not for customers.
Alderman Branen asked how long construction would take and if the property was already
acquired. Mr. Kellikidis responded that construction and opening would take seven to eight
months from permitting, which is anticipated in March or April. The property will be acquired
after tonight's approval.
6 of 60
Commissioner Amborn moved, and Commissioner Kordus seconded to close the Public
Hearing at 7:00 pm.
All were in favor and the motion carried.
Alderman Branen questioned if the revision could be approved at staff level. Mr. Cross replied
yes, and the lighting and parking requirements are good. Mr. Cross added that the parking
requirements with nine spaces proposed should be part of the motion. Mr. Mason stated that he
glanced at the plans and it looked good.
Commissioner Kordus moved, and Alderman Smitz seconded to approve the Conditional Use
Permit and Site Plan based on the revised plans submitted at the October 13, 2026 meeting
with the consideration of designating nine parking spaces, subject to staff's final review and
approval of the submitted site plan, and noting that signage is not approved as part of this action
and shall be subject to a separate sign permitting process.
All were in favor and the motion carried.
Mayor Schultz announced that Commissioners Lois and McKilliip rejoined the meeting.
C. Public Hearing and Consideration of a Conditional Use Permit located at 7148 McHenry
Street, subject to The Lakota Group's memorandum to the Plan Commission.
Mayor Schultz opened the Public Hearing at 7:05 PM.
Commissioner Kordus recused himself and sat in the audience.
Mr. Cross presented a request for a Conditional Use Permit for sand and gravel quarrying on an
approximately 164-acre tract of land. The property was recently annexed into the city and had
previously operated under a 2020 Racine County Conditional Use Permit with 41 conditions.
Staff carried over the 33 conditions relating to operations, nuisances, and inspections. Eight
conditions were omitted because they were regarding county fees and administrative actions
that do not fit the city's framework. The property is zoned Q-1, in which all uses are conditional.
Mr. Cross clarified that the proposed hours of operation are 7:00 am to 5:00 pm, Monday
through Friday and 7:00 am to noon on Saturday, with no Sunday operations. These hours
appear on page 2 of the applicant's narrative and should be corrected on the application form.
Robert Kordus, owner, confirmed the hours. Alderman Smitz noted that the narrative allows
maintenance and repairs outside those hours. Mr. Kordus explained that this allows mechanics
and employees to repair equipment such as a generator or crusher after 5:00 pm so that it is
ready by 7:00 am.
Mr. Cross noted that the application lacked a site plan and a lighting plan. A site plan was
submitted in the past week and is in the packet, but staff had not reviewed it. It shows structures
not mentioned in the application, including a single-family residence. Mr. Kordus explained that
two single-family houses stand outside the mining area and existed when the land was
purchased. One is occupied and one is vacant. A barn and a smaller barn are not used for the
business. There is also a portable 8 x 8-foot wooden scale house and two old fieldstone well
houses. Mr. Kordus also stated that there is no exterior lighting for the mining operation, only
residential lights and motion lights for security cameras. Mr. Cross noted that the phasing plan
in the application shows the quarry being extracted and reclaimed in phases over 20 to 25
years. Mr. Cross stated that he preferred time to complete a formal review and report to the
Commission.
In response to a question from Mayor Schultz, Mr. Cross stated that the quarry may continue to
operate under the previous conditions until the Commission acts. Mr. Cross explained that the
operation was allowed to continue through annexation, with the understanding that the owner
7 of 60
operation was allowed to continue through annexation, with the understanding that the owner
would apply for a city permit.
The Commission asked about past complaints. Mayor Schultz said the county had documented
about four complaints. These concerned noise and engine braking, contamination, and gravel
tracked onto the highway during a rain event. Ms. Watkins stated these matters are addressed
in the conditions, which are consistent with those of other quarries in the city. Mr. Cross
commented that condition 28 requires compliance with the zoning code, including nuisance
provisions. Condition 31 requires Commission approval of site plan changes, and violations can
result in revocation. Mr. Cross said the city has no standing requirement for periodic renewal,
though a condition for periodic review could be imposed. Ms. Watkins noted that a return review
has been used in the past for new or intensive uses. Ms. Watkins reported that the City
Administrator, City Engineer, Fire Chief, police, and herself visited the site that day, found it
quiet and clean, and took baseline photos. Mayor Schultz said he had no interest in relaxing the
county's conditions. Mr. Mason asked about inspectable structures for later reference. Carina
Walters, City Administrator, asked that residents submit time-stamped photos and audio or
video with complaints so that staff can act on data collected.
During the public hearing, the Commission heard the following comments:
Paul Thompson lives in Walworth County near the county line and has lived in the area
since 1965. Mr. Thompson said his family previously owned the property. Mr. Thompson
stated neither he nor the neighbors on Thompson Road have complaints, since occasional
equipment noise "is progress".
Michael Warren, 7220 McHenry Street, thanked the Commission for retaining the
county's conditions. Mr. Warren was concerned the operator may later seek to expand, for
example, by moving an asphalt plant onto the site. Mr. Warren said he emailed a
complaint about repeated engine braking on Saturday and that trucks were operating until
about 1:00 pm, past the noon limit, and trucks starting before 7 am. Mr. Warren
questioned the expectation that residents would document every instance and suggested
the city monitor the site itself. Mr. Warren asked whether the driveway was annexed, and
Ms. Watkins confirmed that it was. Mr. Warren urged the city to be ready to enforce its
ordinance against engine braking on city property.
Marshall Newholm, 7626 McKinney Street, reported numerous complaints. Mr. Newholm
stated runoff from the quarry driveway and parking areas drains onto his land and affects
his foliage and oak trees. Mr. Newholm said the 100-foot setback and a 2-to-1 berm slope
are not adequate and asked that the operation move back to the tree line. Mr.
Newholm also reported trucks speeding down the driveway.
Commissioner McKillip moved, and Commissioner Amborn seconded to close the Public
Hearing at 7:44 pm.
All were in favor and the motion carried.
Mayor Schultz recommended tabling the item because of the number of steps staff and the
applicant must complete, including the site plan, lighting plan, and staff review. Mr. Cross
proposed continuing the item to the November 10th Plan Commission agenda, stating that staff
would communicate deadlines promptly to the applicant. The Commission preferred a specific
date over an indefinite tabling.
Commissioner McKillip moved, and Alderman Smitz seconded to continue discussions for the
Conditional Use Permit to the November 10, 2026 Plan Commission meeting.
All were in favor and the motion carried.
7. ADJOURNMENT
8 of 60
7. ADJOURNMENT
Commissioner Lois moved, and Alderman Smitz seconded to adjourn the meeting at 7:46 pm.
All were in favor and the motion carried.
Minutes respectfully submitted by:
Kristine Anderson
Administrative Assistant
City of Burlington
9 of 60
PLAN COMMISSION ITEM NUMBER 6A
DATE: November 10, 2026
SUBJECT: Continuation of a Public Hearing and Consideration of a Conditional Use Permit located at
7148 McHenry Street for use as a sand and gravel quarry.
SUBMITTED BY: Andy Cross, The Lakota Group, City Planner
PROJECT/SCOPE:
A continuation of a Public Hearing and Consideration of a Conditional Use Permit from Robert Kordus
of Asphalt Contractors for property located at 7148 McHenry Street for a sand and gravel quarry. A few
items were pending from the October 13, 2026 Plan Commission meeting, such as a Site Plan
indicating where buildings are on the property, lighting plan, and staff review. Please see the November
10, 2026 memorandum from The Lakota Group for an update on the outstanding items.
Please see the recap of the original submittal below:
A 164-acre tract of land was recently annexed into the City of Burlington at the property owner's
request. Located south of Burlington on McHenry Street, the land is used for sand and gravel quarrying
by Asphalt Contractors, Inc. Formerly in the Town of Burlington, the site received a Conditional Use
Permit from Racine County in 2020 to operate the quarrying business. Now that the property has been
annexed, a Conditional Use Permit (CUP) from the City of Burlington will be required to continue
operation. The site is comprised of two parcels, each about 80 acres in area. There are similar
quarrying and extraction land uses on nearby tracts of land. The phasing plan for extraction operations
and a reclamation plan that describes how the land will be "reclaimed" and remediated after extraction
operations are complete have been submitted, which are required.
Racine County issued a CUP for this operation in 2020. It has been approved every two years since
then, and includes a list of 41 conditions the business must comply with. The Racine County permit is
no longer valid, as the property is now under the City of Burlington's zoning jurisdiction. However, many
of the conditions remain relevant and should be carried into any Conditional Use Permit approved by
the City of Burlington, which is listed in The Lakota Group's memorandum dated October 13, 2026,
pages 3–5. The sand and gravel quarrying operation is an appropriate land use and is consistent with
the intent of the Q-1, Quarrying / Extractive zoning district.
ZONING:
The property is zoned Q-1, Quarrying and Extractive District.
TIMING/IMPLEMENTATION:
This item is for final consideration at the November 10, 2026 Plan Commission meeting.
Attachments
Lakota Report
Attachment 1_Lakota October 2026 Report
Conditional Use Permit Application
Residential Units Narrative
Site Plan
Reclamation Plan
10 of 60
PLAN COMMISSION MEMORANDUM
TO: PLAN COMMISSION, City of Burlington
Megan Watkins, Assistant City Administrator/Zoning Administrator
City of Burlington
FROM: Andy Cross, AICP, Senior Planner, The Lakota Group
DATE: November 10, 2026
SUBJECT: Conditional Use Permit for Sand & Gravel Quarrying – Continued from 10/13/26
ADDRESS: 7148 McHenry Street
ZONING: Q-1 Quarrying and Extractive District
APPLICANT: Asphalt Contractors, Inc., Union Grove, WI
Application Summary
A 164-acre tract of land was recently annexed into
the City of Burlington at the property owner’s
request. Located south of Burlington on McHenry
Street, the land is used for sand and gravel
quarrying by Asphalt Contractors, Inc. Formerly in
the Town of Burlington, the site received a
Conditional Use Permit from Racine County in
2020 to operate the quarrying business. Now that
the property has been annexed, a Conditional Use
Permit from the City of Burlington will be required
to continue operation.
The zoning map in Figure 1 shows the property in
a red outline at the bottom of the image.
Properties to the north are also used for quarrying
and extraction. They share the Q-1 zoning district
identified in the gray color.
Previous Consideration
Figure 1: Zoning Map Showing Newly-
Annexed Site
11 of 60
Page 2
The Plan Commission opened the public hearing for this item at the October 13, 2026 meeting.
Following testimony from the public and discussion with the applicant, the Commission voted
to continue the hearing to allow time for the following:
1) Submittal of a Site Plan for the quarry operation
2) Submittal of a Lighting Plan
3) Information about residential units on the property
Staff have received additional documentation from the applicant. Details and analysis are
provided below.
Lighting Plan
There is no exterior lighting at the quarry associated with the business operations. No lighting
plan is required. If exterior lighting is required in the future, proper documentation will be
submitted as part of the building permit process.
Site Plan
The applicants provided a 13-page plan set that includes a site plan, grading plans, phasing plan
for the quarry, and other information. The materials are dated 2020 and the Commission may
wish to inquire if anything substantive has changed since these plans were originally created.
The Site Plan appears on pages 5 and 6 in the plan set. Key features identified on the Plan
include:
Two existing houses
o One is shown in the northeast corner of the property, the other in the southwest
corner
o Both are in undisturbed areas where quarrying and extraction will not take place
3-acre stockpile area
Two ponds
Wetland area
Truck Scale
Wash pond
The plan notes that the stockpile area and wash pond will relocate as extraction work moves
with each phase.
Phasing Plan
Page 7 of the plan set is a Phasing Plan identifying ten areas where extraction will take place on
the property. Work begins on the north end of the site and progresses southward.
Residential Structures
12 of 60
Page 3
Documentation provided by the applicants indicates there are three residential structures on
the property:
1) Farmhouse duplex (2 units)
2) Apartment building (unit count undetermined)
a. Based on the documentation, the Apartment Building appears to be located
close to the Farmhouse duplex. It is not identified on the Site Plan.
3) Single-family Ranch house (1 unit)
The Farmhouse duplex building is fully-occupied and a photo is included in the
documentation. Operators of the quarry maintain the property and intend to continue its
operation as an established residence.
Application materials indicate the Apartment Building was formerly a duplex and is
undergoing renovation currently. No plans or building permits have been submitted to the
City at this point.
The Single-Family Ranch house was constructed in the 1990’s and was occupied when the
applicants took control of the quarry property. While a photo is included in the
documentation submitted by the applicant, a note indicates the “enhanced image is
illustrative” and conditions should be verified on site.
Residential land uses are not permitted in the Q-1 Quarrying and Extractive Zoning District. The
existing structures may continue to operate as legal non-conforming land uses. The Conditional
Use Permit should acknowledge any residential structures on the property and include
conditions on their operation and expansion.
Existing Conditional Use Permit & Conditions
The Commission may recall that the previous Conditional Use Permit issued for the quarry by
Racine County included a list of 41 conditions the business needed to comply with. 33 of these
were carried over as conditions recommended by staff for the current Conditional Use Permit
by the City of Burlington. For reference, they can be reviewed in Attachment 1, which is the
complete staff report as presented at the October 13, 2026 public hearing.
One condition was modified at the October 13 meeting relating to hours of operation. It now
reads as follows:
- The permitted hours of operation for this facility are 7:00 am to 5:00 pm Monday
through Friday and 7:00 AM to 12:00 PM on Saturdays. No operations will take place on
Sunday.
All other conditions remain the same. As noted at the previous public hearing, the applicant
complied with all these conditions when issued the Conditional Use Permit from Racine County
and has indicated that compliance will continue under the City of Burlington’s Permit.
Recommended Conditions
13 of 60
Page 4
1) Staff have identified the conditions in place under the operation’s previous Conditional
Use Permit with Racine County. These should be carried over to the City of Burlington’s
Conditional Use Permit.
2) The Commission may wish to have the Site Plan revised to reflect the location of all
three residential properties identified in the new materials submitted by the applicants,
as well as any other substantive changes since the Site Plan was drawn in 2020.
3) The Commission is asked to consider conditions relating the residential land uses on the
quarry property. At a minimum, the Conditional Use Permit (CUP) should acknowledge
them, allow their continued use (if appropriate), and clarify that these legal non-
conforming land uses cannot expand without amending the CUP.
Staff Recommendation & Findings
Staff recommends the Plan Commission discuss and deliberate on the proposed Conditional
Use Permit and reference the following findings:
A) The sand and gravel quarrying operation as proposed by the applicant in the application
dated 9/4/26, is an appropriate land use at the proposed location at 7148 McHenry
Street and is in accordance with the purpose and intent of the Zoning Code.
B) The proposed land use is consistent with the intent of the Q-1 Quarrying / Extractive
zoning district because this is continuation of an existing quarry, provides maximum
protection to the natural environment, and provides for the restoration of the area in a
manner that will not deteriorate the natural environment when operations cease.
SAMPLE MOTIONS
These are provided for the Commission’s reference to assist in the deliberation and discussion
on this item. They are not intended to act as a staff recommendation or suggest a specific
course of action. These motions can be modified as needed to accurately address the
Commission’s preferred actions on this application.
“I make a motion to approve the Conditional Use Permit to allow a “sand and gravel
quarrying” operation at 7148 McHenry Street consistent with the application dated
9/4/2026.”
o “with the following conditions…”
“I make a motion to continue the discussion on the Conditional Use Permit for 7148
McHenry Street to the next agenda of the Plan Commission.”
14 of 60
Attachment 1
- Staff Report from 10/13/26 Plan Commission Meeting -
15 of 60
73
16 of 60
74
17 of 60
Recommended Conditions of Approval from the Racine County CUP:
1. Failure to comply with the terms and conditions stated herein could result in the issuance of citation(s)
and/or revocation of this permit.
2. These conditions bind and are applicable to the Property Owner, Applicant, and agents of the Property
Owner (collectively referred to herein as "Property Owner" - Asphalt Contractors) with respect to the uses
on the Property.
3. This extraction operation and reclamation must be conducted in accordance with the previously approved
plans and amendments.
4. The permitted hours of operation for this facility are 7:00 am to 4:00 pm Monday through Friday.
Maintenance and repairs may occur outside of the aforementioned operating hours.
5. Signage shall be installed around the property warning of the mining activity and be spaced no more than
250-feet apart.
6. Noise levels measured at the property lines must never exceed 68 decibels.
7. The hazardous fluid storage areas must be surrounded by a berm as specified in application submittal
material under the “SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN.” Said berm must be of
sufficient height, and width to hold and contain the capacity of all hazardous fluids located in said area.
The containment berm shall be lined with an approved impermeable surface.
8. The project must continue in accordance with the controlling restoration plan. All stockpiles of
overburden and topsoil must be protected from soil erosion. Stockpiles must have side slopes of 2: 1 or
flatter and must be seeded to prevent soil erosion.
9. Surface water runoff from the construction site must be contained within the constructed area and
directed to the sediment ponds. Sediment or other contaminants must not enter the wetlands/floodplain.
All restoration work must comply with the controlling restoration plan.
10. All overburden and topsoil from this site must remain on site and be used for restoration. A minimum of
three (3) inches of topsoil should be spread over the finished restored land if there is adequate material.
Finished side slopes of the restored areas must be 3:1 or flatter to maintain a vegetative condition. The
temporary seeding of the stockpiles must be a mixture of grasses at a rate of five (5) pounds per 1,000
square feet of perennial rye grass, ten (10) pounds of smooth brome and ten (10) pounds of tall grass.
These stockpiles must remain until used to restore the land being mined.
11. All areas restored must be graded in accordance· with the approved restoration plan, must be covered
with a minimum of three (3) inches of topsoil, fertilized and permanently seeded o r sodded by September
15 of the same year in which the finished grading is completed. Should the finished grading be completed
after September 15 all disturbed areas must be temporarily seeded and/or mulched immediately upon
completion of the finished grading, with permanent seeding to be completed by June 15 of the following
year.
12. The existing wetlands shall not be disturbed. Silt fence may be needed around the perimeter of the
wetland to keep sediment from filling the wetland.
13. The owner is responsible for the control and/or cutting of noxious weeds in compliance with City of
Burlington regulations.
14. No well is approved by this action. Such an additional water source will require the further review and
approval by the City of Burlington.
15. The applicant shall continue the annual evaluation of monitoring data to identify actual groundwater
conditions compared to those that are anticipated and provide copies of evaluation to the City of
Burlington. In addition, the pit operator must investigate any reported problems with water supply wells
75
18 of 60
for grou
ndwater uses within 1,000-feet of the quarry limits. If it is determined that the mining operation is
responsible for a well problem, the well must be repaired or replaced as necessary by the pit operator
provided the well is:
a) Located within the well protection area (1,000 feet of the boundary of this quarry).
b) The owner of an existing well allows the representatives of the pit operator to inspect and
test the well prior to excavation; or
c) The owner of any new well drilled during the excavation notify the applicant at the time of
the drilling thereof and allows the applicant to inspect the same to determine its condition.
16. The washing pond(s) must be constructed in a manner that prevents any of the wash water from entering
the wetlands.
17. Dust control must be established as detailed in the submitted “ FUGITIVE DUST CONTROL PLAN.” Airborne
particulate matter shall not exceed Wisconsin State Administrative Code Regulations.
18. Access road must be 24 feet minimum width. Haul access road must be provided with a gate that can be
locked whenever the quarry is not in operation.
19. The applicant is responsible for ensuring that all truck drivers strictly obey all posted speed limits and all
traffic laws. This includes coming to a full stop before entering the public roadway. The quarry driveways
shall have a speed limit of no more than 25 miles per hour. Should this office receive substantial
complaints that such laws are being broken, the City of Burlington reserves the right to revoke this permit
of noncompliance.
20. All haul roads throughout the entire pit must be maintained in an all -weather, dust free condition. When
applying treatment to any access road surface, the pit operator must make every effort to avoid the
spread of this treatment material onto the public roadway. Should such material and/or soil material be
spread, carried, and\or spilled onto the public roadway, the pit operator must act to mitigate the
problem. The haul roads must be provided with gates that can be locked whenever the quarry is not
operation.
21. No "jake-braking" by haul trucks is allowed except under emergency circumstances.
22. No staging of trucks is allowed on CTH P and the 24-foot wide drive from CTH P to the entrance of the
quarry.
23. No blasting is permitted on this property as part of this approval. No explosives shall be used or stored on
this property.
24. The City of Burlington reserves the right to require a complete set of elevations, including bottom of pit
grades, within 60 days’ notice. These elevations must be taken by a registered land surveyor or a
professional engineer. This operation shall not occur below the grades shown on the submitted
restoration plan.
25. The final restoration of this site includes a ½-acre and a 10-acre freshwater pond. The ponds must comply
with all applicable Wisconsin Department of Natural Resources and United States Army Corps of
Engineers recommendations or requirements. The site operator must retain on the site an amount of
topsoil and overburden that is an ample amount to cover all the disturbed area outside the ponds with a
minimum of 6-inches of subsoil and a minimum of 6 inches of topsoil. The side slopes of the proposed
pond must be sloped, covered with soil, and seeded to prevent excessive soil erosion until all phases of
this quarry are completed. A 75-foot grassed buffer planted with prairie grasses or native plantings shall
be established around the perimeter of the pond, with the remaining land put back in agricultural
production.
76
19 of 60
26. Ample amoun
ts of topsoil to complete reclamation as approved will remain on the site always. If it is
determined by the City of Burlington that, at any time, the amount of topsoil on site is not sufficient to
accomplish reclamation as approved, then the financial assurance will be adjusted to cover the deficiency.
27. The applicant must provide this office with an as-built survey when restoration is completed.
28. The applicant must comply with the provisions of Chapter 315 (Zoning Code) of the City of Burlington
Municipal Code.
29. The applicant must allow City of Burlington employees full and unlimited access to the project site at a
reasonable time to investigate the project’s construction, operation, or maintenance.
30. The applicant is responsible for obtaining all necessary federal, state, and local permits, approvals, and
licenses. The applicant is required to comply with all applicable local, state, and federal regulations.
31. No additions, deletions, or changes may be made to the project, site plan, or these conditions without
prior approval from the City of Burlington. All addition deletion, and/or change requests must be
submitted to the City Administrator’s office in writing.
32. It is the property owner’s responsibility to inform any subsequent owner or operator of these conditions.
33. The applicant must furnish the necessary sureties which will enable the City to perform the restoration of
the site in the event of default by the applicant as required in Section 315 -34(G)(2).
The applicant complied with all these conditions when issued the Conditional Use Permit from
Racine County and has indicated that compliance will continue under the City of Burlington’s
Permit.
Zoni
ng Code & Land Use Analysis
Section 315-34 of the Zoning Code establishes the Q-1 Quarrying / Extractive zoning district.
The district is intended to “provide for the orderly continuation or restoration of existing
quarries or other extractive and related operations and to provide for the location in
approximate places of new extractive operations that provide maximum protection to the
natural environment. This district further provides for the restoration of quarries in a manner
that will not deteriorate the natural environment.”
All land uses in the Q-1 zoning district are conditional and relate to nonmetallic mining,
quarrying, and extraction of materials. “Sand and gravel quarrying” is identified in the list of
allowable uses.
Special Regulations
Section 315-34 establishes two special regulations for quarrying / extractive land uses:
1) Conditional Use Permit Application with the following:
a. Plat of survey of the proposed site and a description of operational methods
b. List of equipment, machinery, and structures to be used
c. Source, quantity, and disposition of water to be used
d. Topographic map showing site contours, trees, and access roads
e. Depth of all existing and proposed excavations
f. Restoration Plan
77
20 of 60
2) Restoration Plan, fees, and sureties to complete the restoration plan if needed.
The application materials provide much of this information. There is a detailed Reclamation
(Restoration) Plan, a project narrative with information about the quarrying operation, and a
phasing plan identifying where extraction activities will take place.
Missing Items
City staff are working with the applicant to provide two remaining items:
1) Plat of survey / Site plan identifying all structures on the site, setbacks, storage areas,
parking areas, and other key features.
2) Lighting Plan
a. This is required by Section 315-34 and must identify all exterior lighting fixtures
on the property, including information on the specific luminaires, mounting
heights, and fixture locations.
Conditional Uses
Section 315-130 of the Zoning Code establishes standards for Conditional Use Permits. It allows
the Plan Commission to authorize the Zoning Administrator to issue a Conditional Use Permit
provided the following:
1) The proposed land use is in “accordance with the purpose and intent of this chapter” and
2) The proposed use is “found to be not hazardous, harmful, offensive, or otherwise
adverse to the environment or the value of the neighborhood or the community.”
The purpose and intent of the Zoning Code, established in Sections 315-3 and 315-4, is to
“promote the comfort, health, safety, morals, prosperity, aesthetics, and general welfare of the
City of Burlington, Wisconsin” and “regulate and restrict the use of all structures, lands and
waters” by placing controls on density, parking and loading, lot coverage and building heights,
land uses, and design, among other things.
Recommended Conditions
Staff have identified the conditions in place under the operation’s previous Conditional Use
Permit with Racine County. These should be carried over to the City of Burlington’s Conditional
Use Permit.
Staff also asks the Commission to require the submittal of the missing application materials
identified in this staff report.
Staff Recommendation
Staff recommends the Plan Commission discuss and deliberate on the proposed Conditional
Use Permit and reference the following findings:
78
21 of 60
A) The sand and gravel quarrying operation as proposed by the applicant in the application
dated 9/4/26, is an appropriate land use at the proposed location at 7148 McHenry
Street and is in accordance with the purpose and intent of the Zoning Code.
B) The proposed land use is consistent with the intent of the Q-1 Quarrying / Extractive
zoning district because this is continuation of an existing quarry, provides maximum
protection to the natural environment, and provides for the restoration of the area in a
manner that will not deteriorate the natural environment when operations cease.
SAMPLE MOTIONS
These are provided for the Commission’s reference to assist in the deliberation and discussion on
this item. They are not intended to act as a staff recommendation or suggest a specific course
of action. These motions can be modified as needed to accurately address the Commission’s
preferred actions on this application.
• “I make a motion to approve the Conditional Use Permit to allow a “sand and gravel quarrying”
operation at 7148 McHenry Street consistent with the application dated 9/4/2026.”
o “with the following conditions…”
• “I make a motion to continue the discussion on the Conditional Use Permit for 7148 McHenry
Street to the next agenda of the Plan Commission.”
79
22 of 60
PLAN COMMISSION ITEM NUMBER 6C
DATE: October 13, 2026
SUBJECT: Public Hearing and Consideration of a Conditional Use Permit located at 7148 McHenry
Street.
SUBMITTED BY: Andy Cross, The Lakota Group, City Planner
PROJECT/SCOPE:
A Public Hearing and Consideration of a Conditional Use Permit from Robert Kordus of Asphalt
Contractors for property located at 7148 McHenry Street. A 164-acre tract of land was recently annexed
into the City of Burlington at the property owner's request. Located south of Burlington on McHenry
Street, the land is used for sand and gravel quarrying by Asphalt Contractors, Inc. Formerly in the Town
of Burlington, the site received a Conditional Use Permit from Racine County in 2020 to operate the
quarrying business. Now that the property has been annexed, a Conditional Use Permit (CUP) from the
City of Burlington will be required to continue operation. The site is comprised of two parcels, each
about 80 acres in area. There are similar quarrying and extraction land uses on nearby tracts of land.
The phasing plan for extraction operations and a reclamation plan that describes how the land will be
"reclaimed" and remediated after extraction operations are complete have been submitted, which are
required.
Racine County issued a CUP for this operation in 2020. It has been approved every two years since
then, and includes a list of 41 conditions the business must comply with. The Racine County permit is
no longer valid, as the property is now under the City of Burlington's zoning jurisdiction. However, many
of the conditions remain relevant and should be carried into any Conditional Use Permit approved by
the City of Burlington, which is listed in The Lakota Group's memorandum dated October 13, 2026,
pages 3–5. The sand and gravel quarrying operation is an appropriate land use and is consistent with
the intent of the Q-1, Quarrying / Extractive zoning district.
Staff have identified the conditions in place under the operator's previous CUP with Racine County.
These should be carried over to the City of Burlington's CUP. Staff also asks the Commission to require
the submittal of the missing application materials.
ZONING:
The property is zoned Q-1, Quarrying and Extractive District.
TIMING/IMPLEMENTATION:
This item is for final consideration at the October 13, 2026 Plan Commission meeting.
Attachments
Lakota's memo
Public Hearing Notice
7148 McHenry application/survey
Gravel Pit property marking
72
23 of 60
THE PLAN COMMISSION IN AND FOR THE CITY OF BURLINGTON
Notice of Hearing on
Proposed Conditional Use Permit
M-4, Manufacturing District
TO WHOM IT MAY CONCERN:
NOTICE is hereby given that the Plan Commission of the City of Burlington, Racine
County, Wisconsin, will conduct a hearing to discuss the proposed Conditional Use Permit
for:
Owner: Asphalt Contractors Inc. – Robert Kordus
Applicant: Asphalt Contractors Inc.
Location: 7148 McHenry Street
Zoning: M-4, Manufacturing District
Use: To allow for non-metallic mining operations
NOTICE IS FURTHER GIVEN that a hearing on the above-mentioned Conditional Use
Permit will be held by the City Plan Commission via Zoom meetings.
TUESDAY, OCTOBER 13, 2026 DURING THE MEETING OF THE PLAN
COMMISSION SCHEDULED TO BEGIN AT 6:30 P.M. OR SHORTLY
THEREAFTER
This meeting will be conducted remotely at:
Remote Meeting Log in information:
Webinar link: https://zoom.us/join
Webinar ID: 821 2784 4977
Password: 441655
Phone: (312) 626-6799
To consider the above Conditional Use Permit and to hear persons in support thereof or
opposition thereto.
CITY OF BURLINGTON
PLAN COMMISSION
Dated at Burlington, Wisconsin, 21st day of September, 2026.
Diahnn Halbach, City Clerk
Published in the Burlington Standard Press
September 24th and October 1st, 2026
80
24 of 60
81
25 of 60
82
26 of 60
83
27 of 60
85
28 of 60
..... /JIii/ii
ASPHALT
CONTRACTORS INC
Grading-Paving-Sealing-Striping
Tel (262)878-4678 Fax (262)878-5411 www.asphaltinc.com
Narrative
Proiect Description
The proposal is to continue operating a sand and gravel operation on a former campground
west of the Highway P and Fish Hatchery Road intersection. The existing paved driveway to the
site does provide truck access to Highway P. The gravel mining will include removal of the soil
overburden, crushing, screening, and stockpiling of sand gravel, trucking, and site reclamation.
A primary use will be to make specialized crushed products unique to producing asphalt mixes.
Operation Methods
Refer to attached operation plan that shows the phased operatf ons and final reclamation. The
entrance is asphalt and will be maintained asphalt to provide access to the street.
The area for equipment storage and stockpiles has been established. Washing ponds are
already in existence. Once sufficient room is available at the bottom of the pit, the existing
washing ponds will be relocated. When there is enough room at the bottom of the pit, the
washing ponds will be moved to the bottom of the pit. Silt removed from the ponds will be
deposited into the finished slopes at the perimeter of the pit.
During each phase topsoil and clay which averages two to three feet thick, will be placed in
separate soil berms in various areas of the pit. Soil berms will also continue along the south and
east side.
As the phases are excavated, soil removed ahead of the excavation will be used to reclaim area·s
in a previous phase that is shaped for reclamation. We are currently working in Phase Two (2)
and applying to move into Phase Three (3).
As the perimeter of the pit is excavated we will accept clean fill from outside sources to
increase the depth of soil on the slopes to help stabilize the slope. There will be no concrete or
asphalt recycling activities taking place on this property. We are currently monitoring the site to
ensure that we are keeping the site free of trash and debris.
Operations Equipment
1
86
29 of 60
87
30 of 60
88
31 of 60
89
32 of 60
90
33 of 60
PROPERTY RETENTION | RESIDENTIAL DOCUMENTATION
Existing Residential Structures
7148 McHenry Street, Burlington, Wisconsin
This exhibit summarizes the background, existing residential use, current tenancy information, planned retention, and
maintenance of the three residential buildings identified by Asphalt Contractors, Inc. (ACI). Building location references
and digitally enhanced exterior views are included on the following pages.
PURPOSE OF REQUEST
ACI proposes retaining the existing residences rather than demolishing them. According to ACI, the buildings were
already used for residential tenancy when the property was purchased. Keeping them allows continued use of existing
housing, including employee-family housing, and supports ongoing maintenance and reinvestment in the property
instead of unnecessary demolition.
RESIDENTIAL BUILDING SUMMARY
SITE ID STRUCTURE UNITS PRESENT USE / STATUS
B-01 Farmhouse duplex 2 Two employee households
B-02 Apartment building 2* Renovation in progress
B-03 Single-family ranch 1 Established rental use
* The apartment building is described in ACI's source notes as a preexisting duplex. Its final approved unit layout and current occupancy should
be confirmed.
DOCUMENTATION NOTES
Construction years: approximately 1940 for the farmhouse and apartment building; 1990s for the ranch, based on owner
estimates, not verified records.
Sale / tenancy: the materials describe past or ongoing rental use, but no sale plan or final post-renovation lease terms.
Site plan: see the labeled aerial on page 2; no official plan provided.
Images: edited for presentation; not current-condition documentation.
EXISTING RESIDENTIAL STRUCTURES • OWNER-SUPPLIED BACKGROUND 1 / 5
34 of 60
ASPHALT CONTRACTORS, INC.
7148 MCHENRY STREET | BURLINGTON, WISCONSIN
Exhibit A | Building Location Reference
Building identifiers used throughout this exhibit are shown below. These aerial photographs are for location reference; they are not a
boundary survey, scaled site plan, or confirmation of dwelling-unit approvals.
EXISTING FARMSTEAD AERIAL
B-02
B-01
RANCH AERIAL INSET
B-03
SITE-PLAN LEGEND
B-01 Farmhouse duplex
Units F-1 and F-2
B-02 Apartment building
A-1 and A-2; layout to confirm
B-03 Single-family ranch
Unit R-1
For the formal site-plan submission: mark these same building IDs and unit designations
on the official scaled plan. Relative positions shown above should be checked against
that plan before filing.
EXISTING RESIDENTIAL STRUCTURES • OWNER-SUPPLIED BACKGROUND 2 / 5
35 of 60
ASPHALT CONTRACTORS, INC.
7148 MCHENRY STREET | BURLINGTON, WISCONSIN
Farmhouse Duplex B-01
Existing two-unit residential building
BUILDING FACTS
APPROXIMATE CONSTRUCTION
Circa 1940 (ACI estimate; not verified)
EXISTING CONFIGURATION
Two residential units; in place before ACI
acquired the property
TENANCY
Two ACI employees and their respective families
currently reside in the building
SITE PLAN DESIGNATION
B-01; separate unit labels F-1 and F-2
BACKGROUND AND REASON FOR RETENTION
The farmhouse was already in residential duplex use when ACI acquired the property, with an established tenant history and
mailing address information. ACI has continued this use. Retention preserves two established dwellings and housing currently
used by employee families.
ONGOING CONDITION AND MAINTENANCE
ACI reports regular improvements to maintain the building as a rental. The building has an exterior stair and porch area visible in
the photograph. Continued maintenance will address ordinary repairs, exterior upkeep, and tenant-related needs as they arise.
DWELLING UNIT AND OCCUPANCY REFERENCE
F-1 Employee household / family residence
F-2 Employee household / family residence
Occupant names, individual mailing designations, certificates and exact construction records were not supplied for this exhibit.
EXISTING RESIDENTIAL STRUCTURES • OWNER-SUPPLIED BACKGROUND 3 / 5
36 of 60
ASPHALT CONTRACTORS, INC.
7148 MCHENRY STREET | BURLINGTON, WISCONSIN
Apartment Building B-02
Existing residential building | renovation underway
BUILDING FACTS
APPROXIMATE CONSTRUCTION
Circa 1940 (ACI estimate; not verified)
PRIOR CONFIGURATION
Described in ACI notes as a duplex with prior
tenants and mailing address(es)
CURRENT CONDITION / USE
Renovations in progress; occupancy information
not supplied
SITE PLAN DESIGNATION
B-02; A-1 / A-2 (to verify)
BACKGROUND AND REASON FOR RETENTION
ACI reports that this structure was established for residential use before its acquisition, rather than a newly proposed residential
building. Keeping the structure would preserve an existing residential improvement while allowing renovations to be completed
instead of removing the building.
PROSPECTIVE TENANCY AND MAINTENANCE
The property is currently undergoing renovation. ACI proposes retaining it for residential rental after the renovation; the final
tenancy arrangements and any required municipal approvals remain to be confirmed. Ongoing upkeep would include the deck,
access stairs, exterior, grounds, and ordinary repairs as needed.
DWELLING UNIT AND OCCUPANCY REFERENCE
A-1 Renovation underway; tenancy not yet documented
A-2 Renovation underway; tenancy not yet documented
The A-1/A-2 labels are identification placeholders, not verification of the number of lawful dwelling units. ACI should verify the approved
layout and occupancy before submission.
EXISTING RESIDENTIAL STRUCTURES • OWNER-SUPPLIED BACKGROUND 4 / 5
37 of 60
ASPHALT CONTRACTORS, INC.
7148 MCHENRY STREET | BURLINGTON, WISCONSIN
Single-Family Ranch B-03
Existing single-family rental residence
BUILDING FACTS
APPROXIMATE CONSTRUCTION
1990s (ACI estimate; not verified)
EXISTING CONFIGURATION
Single-family house with attached garage
RENTAL HISTORY
Occupied by tenants before ACI purchased the
property; ACI reports continued rental use
SITE PLAN DESIGNATION
B-03; Unit R-1
BACKGROUND AND REASON FOR RETENTION
The ranch residence was already present, occupied, and associated with a mailing address when ACI acquired the property. ACI
has maintained the house as a single-family rental. Retaining the home allows a longstanding residential use to continue and
avoids removing an existing housing improvement.
ONGOING CONDITION AND MAINTENANCE
ACI reports making regular improvements as part of its rental-property maintenance. Future upkeep will address building
components, the attached garage, driveway and surrounding grounds as needed. The enhanced image is illustrative; physical
conditions should be verified on site.
DWELLING UNIT AND OCCUPANCY REFERENCE
R-1 Single-family rental; current tenant status to confirm
No definitive build year, recent professional property-condition report, or individual tenancy documentation was supplied. These items should
be provided if specifically required by the reviewing authority.
EXISTING RESIDENTIAL STRUCTURES • OWNER-SUPPLIED BACKGROUND 5 / 5
38 of 60
39 of 60
40 of 60
41 of 60
42 of 60
43 of 60
44 of 60
45 of 60
46 of 60
47 of 60
48 of 60
49 of 60
50 of 60
51 of 60
52 of 60
53 of 60
54 of 60
55 of 60
56 of 60
57 of 60
58 of 60
59 of 60
60 of 60
Source: City of Burlington website. First collected Nov 9, 2026.