RecordWell Data

Capital Improvement Plan Workshop — Agenda Packet

City of Menasha · Winnebago County · Common Council · meeting of Nov 2, 2026 · Agenda packets

Open the original document More from City of Menasha

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

A Quorum of the Administration Committee, Board of Public Works, Personnel Committee, Plan Commission, Redevelopment Authority, and other City bodies may attend this meeting, though no official action of these bodies will be taken. COMMON COUNCIL WORKSHOP CAPITAL IMPROVEMENT PLAN (CIP) AGENDA Monday, November 2, 2026 at 4:30 PM First Floor Conference Rooms 100 Main Street, Menasha, WI A. Call to Order B. Pledge of Allegiance C. Roll Call D. Public Comments on Any Matter of Concern to the City (5 minute time limit for each person) E. Discussion Items 1. 2027 - 2031 Capital Improvement Plan (CIP) F. Adjournment MEETING NOTICE November 2, 2026 Common Council Meeting – 6:00 PM Committee Meetings to Follow "Menasha is committed to its diverse population. Our Non-English speaking population and those with disabilities are invited to contact the Menasha City Clerk at 967-3603 24-hours in advance of the meeting for the City to arrange special accommodations." Page 1 of 34 2027 Capital Improvement Plan Page 2 of 34 AGENDA Parks & Recreation Community Development Neenah-Menasha Fire Rescue Police Department Clerk’s Office Public Works Page 3 of 34 PARKS & RECREATION CITY OF MENASHA Page 4 of 34 PARKS & REC | 2026 https://www.istockphoto.com/photo/asian-waitress-wear- protective-face-mask-scan-customer-temperature-by- thermometer-gm1226131871-361155825 • Jefferson Park • Completion of Jefferson Park Boat Launch • Aquatic Facility Concept Design & Capital Campaign Planning Study • Canal Commons • Opened new park with extension of walking trails along waterfront • Pleasants Park • Installation of new playground in cooperation with MJSD • Clovis Grove Tennis Courts • Secured $200k grant from USTA to help support funding of fully reconstructed and expanded tennis courts; Shared funding w/ MJSD • Began construction in August • Trestle Trail (Year 2 of Project) • Replaced railing posts and cables on Trestle • High Cliff Connection • Continued progress on design of Woodlands West Segment (Kernan Ave to Lake Park Rd) - construction to begin in 2028 Page 5 of 34 PARKS & REC | WHAT’S AHEAD Project 2027 2028 2029 Total Est. Cost Funding Sources Clovis Grove Tennis Court Reconstruction $168,000 $735,000 USTA Grant, MJSD, City Trestle Trail Rehab $25,000 $25,000 $25,000 $50,000/year City and Fox Crossing High Cliff Connection $250,000 $400,000 $1.5M in 2028 and 2029 for construction – 2 segments City, Harrison, CFFVR, Donations, Grants Lawson Canal/Banta Point Greenspace $10,000 $350,000 2027-$20k (design) 2028-$350k (construction) City, possible grants Page 6 of 34 PARKS & REC | WHAT’S AHEAD Project 2027 2028 2029 Estimated Total Cost Funding Sources Smith Park Concept Plan $25,000 $25,000 City Smith Park Playground $450,000 $625,000 City, Donations Smith Park Bridge Replacement $25,000 $125,000 Hart Park Skatepark $25,000 $250,000 $1,500,000 City, Grants, Donations ReForest Menasha $25,000 TBD TBD $350,000 City, Grants, Donations Aquatic Facility $1,300,000 $3,500,000 $3,500,000 $18,000,000 City, Donations Page 7 of 34 COMMUNITY DEVELOPMENT CITY OF MENASHA Page 8 of 34 COMMUNITY DEVELOPMENT 2027 Projects • Downtown Gateways $50,000 • Broad Street Bicycle Boulevard $25,000 • Lawson Canal Fill $200,000 Page 9 of 34 NEENAH-MENASHA FIRE RESCUE CITY OF MENASHA Page 10 of 34 N-M FIRE RESCUE 2027-2031 Capital Plan Year Amount in Menasha CIP 2027 $1,019,578 2028 $109,242 2029 $577,514 2030 $281,138 2031 $334,220 Five-year total $2,321,692 Amounts shown in the October 27, 2026, Menasha CIP worksheet. 2027 includes $865,040 for the aerial. Page 11 of 34 N-M FIRE RESCUE 2027 Capital Project Amount in Menasha CIP SCBA air compressor $70,000 Mobile hoist $31,456 Personal protective equipment $29,490 Aerial Apparatus $865,040 Equipment replacement program $23,592 Annual total $1,019,578 PPE moved from Operating Budget, Aerial Apparatus is contractually obligated Page 12 of 34 N-M FIRE RESCUE 2028 Capital Project Amount in Menasha CIP Station 36 air compressor $15,000 Station 35 air compressor $15,000 Heavy duty rescue vehicle: equipment and upfitting $24,194 Personal protective equipment $29,490 Equipment replacement program $25,558 Annual total $109,242 Heavy duty rescue vehicle: equipment and upfitting…Vehicle was prepaid when ordered, remainder is for equipment. Page 13 of 34 N-M FIRE RESCUE 2029 Capital Project Amount in Menasha CIP Tool room updates $29,000 Engine 35 replacement $491,500 Personal protective equipment $29,490 Equipment replacement program $27,524 Annual total $577,514 Source: 2027–2031 CIP by Department, October 27, 2026. Page 14 of 34 N-M FIRE RESCUE 2030 Capital Project Amount in Menasha CIP Equipment trailer and tow vehicle $78,640 Inspector vehicles (2) and command vehicle (1) $141,552 Personal protective equipment $31,456 Equipment replacement program $29,490 Annual total $281,138 Source: 2027–2031 CIP by Department, October 27, 2026. Page 15 of 34 N-M FIRE RESCUE 2031 Capital Project Amount in Menasha CIP SCBA replacement $196,600 Command vehicles (2) $74,708 Personal protective equipment $31,456 Equipment replacement program $31,456 Annual total $334,220 Source: 2027–2031 CIP by Department, October 27, 2026. Page 16 of 34 Questions? Thank you for your continued support of Neenah-Menasha Fire Rescue. Fire Chief Travis J. Teesch Page 17 of 34 POLICE DEPARTMENT CITY OF MENASHA Page 18 of 34 POLICE DEPARTMENT • Traffic Camera Network Expansion • Police Vehicle Replacement • Police Portable Radio Replacement • Ejector Pit Upgrade • Police Mobile Radio Purchase • Garage Floor Epoxy 2026 Capital Improvement Accomplishments Page 19 of 34 POLICE DEPARTMENT •PD Building Radio Signal Booster                                           $37,600 •Police Vehicle Replacement                                                    $210,000 •Police Body Camera & In-Car Video Replacement                  $130,000 •Traffic Camera Network                                                           $14,000 •Portable Radios                                                                       $27,800 •Patrol Rifle Replacement                                                         $6,900 •TASER Replacement                                                               $10,000 •Building Study                                                                          $18,500 2027 Page 20 of 34 POLICE DEPARTMENT •PD Building Radio Signal Booster (Phase 3 if needed)               $27,300             •Police Vehicle Replacement                                                        $309,000 •Police Body Camera & In-Car Video Contract                             $130,000 •Traffic Camera Network                                                               $25,000 •Portable Radios                                                                           $27,800 •Patrol Rifle Replacement                                                             $6,900 •TASER Replacement                                                                   $25,000 •Meridian Traffic Barricades                                                          $58,000 •PD Security Cameras                                                                  $30,000 2028 Page 21 of 34 POLICE DEPARTMENT • Police Vehicle Replacement                                                        $315,000 •  Police Body Camera & In-Car Video Contract                             $130,000 •  Traffic Camera Network                                                               $25,000 •  Portable Radios                                                                           $26,500 •  Patrol Rifle Replacement                                                             $6,900 •  TASER Replacement                                                                   $25,000 2029 Page 22 of 34 POLICE DEPARTMENT • Police Vehicle Replacement                                                        $298,000 •  Police Body Camera & In-Car Video Contract                             $130,000 •  Traffic Camera Network                                                               $25,000 •  Portable Radios                                                                           $26,500 •  Patrol Rifle Replacement                                                             $6,900 •  TASER Replacement                                                                   $25,000 2030 Page 23 of 34 POLICE DEPARTMENT • Police Vehicle Replacement                                                        $298,000 •  Police Body Camera & In-Car Video Contract                             $130,000 •  Traffic Camera Network                                                               $25,000 •  Portable Radios                                                                           $26,500 •  Patrol Rifle Replacement                                                             $6,900 •  TASER Replacement                                                                   $25,000 2031 Page 24 of 34 CLERK’S OFFICE CITY OF MENASHA Page 25 of 34 Clerk’s Office | 2027 https://www.istockphoto.com/photo/asian-waitress-wear- protective-face-mask-scan-customer-temperature-by- thermometer-gm1226131871-361155825 • Current Badger Book Background: • Purchased in 2022 • Implementation during the February 21, 2023, Spring Primary Election • Five-year estimated lifespan for hardware • Hardware-related issues in January 2026 and in August 2026 • Timeline: • Use current Badger Book computers through 2027 Elections (February [if needed] and April) • Purchase toward end of 2027 (WEC to potentially make changes during “off-season”) • Implementation in early 2028, leading up to Presidential Election in on November 7, 2028 Page 26 of 34 Clerk’s Office | 2029 • New tabulators to be purchased by Winnebago County in late 2028 • Current tabulators will have been in use for approximately 15 years • City of Menasha must use the equipment that Winnebago County purchases • Winnebago County will invoice the City of Menasha in early 2029 for the cost of the new tabulators Page 27 of 34 PUBLIC WORKS CITY OF MENASHA Page 28 of 34 PUBLIC WORKS | 2027 Street / Utility Construction • WIS 114 / Plank Rd (Manitowoc St – Melissa St)  $414K *Utility Construction Only, Street Construction in 2028 • Brighton Dr (Bridge – Terminus) $569K • Butte des Morts Dr (Lakecrest Dr – Tayco St)  $146K • Lakecrest Dr (7th St – Edgewater Dr) $142K • First Addition to Lake Park Heights (Winnipeg St, Lotus Tr, Madi Ct, Tana Ln) $547K • WIS 114 / Washington St (Fox River – Canal) $70K *Railroad Crossing Removal • Beck St (Valley Rd – W Palisades Dr)  $7K *Joint Project with Fox Crossing • Pavement Replacement Program $101K *Street, Sidewalk, Curb & Gutter • Pavement Preservation Program $110K *Chip Sealing & Crack Sealing Page 29 of 34 PUBLIC WORKS | 2027 Other Construction • Appleton Rd / 7th St Pedestrian Beacons $15K • Lake Park Villas Spillway $200K Engineering • WIS 114 / Plank Rd (Manitowoc St – Melissa St)  $124K *Design & Real Estate • WIS 114 / Washington St / Tayco St (Nicolet Blvd – 3 rd St) $10K • Pleasants Park Stormwater Facility $50K • Fox River / South Shore Sanitary Sewer $125K Page 30 of 34 PUBLIC WORKS | 2027 Planning Projects • WIS 47 / Appleton Rd (9th St – CTH AP/Midway Rd)  $8K • R-11-26 Sewer System Evaluation $60K Equipment • #0022 Dump Truck – Snow Package  $188K • #0033 Dump Truck – Snow Package  $188K • #0017 Plow & Wing $60K • #3010 Utility Truck $75K • #0002 Pickup Truck (Operations) $54K • #2001 Pickup Truck (Engineering) $55K Page 31 of 34 PUBLIC WORKS | 2028+ Major Future Projects • WIS 114 / Plank Rd (Manitowoc St – Oneida St)  $145K – 2028 • Fox River / South Shore Sanitary Sewer $2.5M – 2028 • Earl St (Airport Rd – Midway Rd)  $1.5M – 2029 • Pleasants Park Stormwater Facility $1.6M – 2029 • Nicolet Blvd (Washington St – Ahnaip St)  $3.7M – 2030 • Airport Rd / Eugene St (Appleton Rd – Meadowview Dr)  $823K – 2030  • Garfield Ave (Lawson St – Washington St)  $2.0M – 2031 • London St (9th St – Airport Rd) $863K – 2031 Major Equipment • Sanitation Truck $460K – 2028 • Jet Vac Truck $850K – 2029 • Sanitation Truck $400K – 2030 Page 32 of 34 PUBLIC WORKS STREET CONSTRUCTION RATE PROJECTS BY CENTERLINE MILAGE 2022 2023 2024 2025 2026 2027 Average 1.3 mi 0.6 mi 2.2 mi 1.6 mi 0.6 mi 1.1 mi 1.2 mi 61 YEARS REPLACEMENT RATE 1.2 MI AVERAGE CONSTRUCTION 75 MI TOTAL STREET NETWORK 1.1 MI PROPOSED CONSTRUCTION Page 33 of 34 Page 34 of 34

Source: City of Menasha website. First collected Nov 9, 2026.