RecordWell Data

Packet

City of Lodi · Columbia County · meeting of Nov 5, 2026 · Agenda packets

Open the original document More from City of Lodi

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Common Council Agenda - Special Meeting Call To Order Roll Call Final Resolution Authorizing Public Improvement And Levying Special Assessments Against Benefitted Property In The City Of Lodi, Wisconsin (Hwy 60) RESOLUTION 26-78 AUTHORIZING PUBLIC IMPROVEMENTS AND LEVYING SPECIAL ASSESSMENTS (HWY 60).PDF FINAL ASSESSMENT REPORT - 2026 DOWNTOWN IMPROVEMENTS.PDF Final Resolution Authorizing Public Improvement And Levying Special Assessments Against Benefitted Property In The City Of Lodi, Wisconsin (Fair St) RESOLUTION 26-79 AUTHORIZING PUBLIC IMPROVEMENTS AND LEVYING SPECIAL ASSESSMENTS (FAIR ST).PDF FINAL ASSESSMENT REPORT - 2026 STREET AND UTILITY IMPROVEMENTS FAIR STREET.PDF Adjourn Posted:_________________ By:_____________________ Members: Mayor Marx, Alder Crow, Alder Flanagan, Alder Kutz, Alder Heller, Alder Ripp, Alder Stevenson (President) Agendas may change up to 24 hours prior to the commencement of the meeting. Reasonable accommodations for persons with disabilities may be made in advance by calling City Hall at 608 -592- 3247. PLEASE TAKE NOTICE: There will be a City of Lodi Common Council meeting Thursday, November 5, 2026 at 4:00 pm in the City Hall Council Room, 130 South Main Street, Lodi, WI. Meeting Link: https://events.gcc.teams.microsoft.com/event/1cdcac95-a58b-47a9-bf44- 52f4c95b9aec@b47e60e2-f56b-4da2-a329-4ba078adf6b9? source=copyLinkOneEventsShareDialog 1. 2. 3. Documents: 4. Documents: 5. G:\00\00080\00080103\SPECIAL ASSESSMENTS\00080103 FINAL RESOLUTION.DOC RESOLUTION 26- 78 FINAL RESOLUTION AUTHORIZING PUBLIC IMPROVEMENT AND LEVYING SPECIAL ASSESSMENTS AGAINST BENEFITTED PROPERTY IN THE CITY OF LODI , WISCONSIN (HWY 60) WHEREAS, the Common Council of the City of Lodi, Wi sconsin, held a public hearing at the Council Chambers in the City Hall building at 5 :3 0 p.m. on the 9 th day of September , 202 6 , for the purpose of hearing all interested persons concerning the preliminary resolution and report of the City Engineer on the proposed public improvements consisting of reconstructing Highway 60 , including sanitary sewer, water main, and storm sewer improvements, 4-inch and 6-inch concrete sidewalk, and concrete curb & gutter construction. P reliminary assessments against benefited property , and heard all persons who desired to speak at the hearing; NOW, THEREFORE, BE IT RESOLVED, the Common Council of the City of Lodi, Wisconsin, determines as follows: 0. The final report of the City Engineer, a copy of which is attached hereto and incorporated herein as if fully set forth herein, including the plans and specifications and assessments set forth therein, is adopted and approved. 1. The City Engineer advertised for bids and construction of the improvements were completed in accordance with the report hereby adopted. 2. Payment for the improvements shall be made by assessing 50% of the total cost of the 4- inch and 6-inch sidewalk and concrete curb & gutter to the property benefited as indicated in the report . 3. Assessments shown on the report represent an exercise of the police power and have been determined on a reasonable basis and are hereby confirmed. 4. Assessments for all projects included in the report are hereby combined as a single assessment but any interested property owner may object to each assessment separately or all assessments jointly for any purpose. 5. Assessments shall be due within 30 days of billing date. Assessments may be paid in cash or in four (4) annual installments to the City Clerk. Installments shall be placed on the next tax roll after the due date for collection and shall bear interest at the rate of 5.0 % per annum on the unpaid balance from January 1 of the year following the levy . 6. The City Clerk shall publish this resolution as a Class 1 notice under ch. 985, Stats., in the assessment district and mail a copy of this resolution and a statement of the final assessment against the benefited property together with notice of installment payment privileges to every property owner whose name appears on the assessment roll whose post office address is known or can with reasonable diligence be ascertained. Dated ______________________ Signed ____________________________________ Thomas Marx , Mayor Published ___________________ Attest _____________________________________ Arissa Watkins, City Clerk TOWN & COUNTRY ENGINEERING, INC. Madison ⧫ Rhinelander ⧫ Kenosha ⧫ Platteville 6264 Nesbitt Road • Madison, WI 53719 • (608) 273-3350 • tce@tcengineers.net FINAL ASSESSMENT REPORT 2026 DOWNTOWN IMPROVEMENTS STH 60 (Plans and Specifications under separate cover are available at the Office of the City Clerk and are a part of this report) City of Lodi, Wisconsin October 2026 TABLE OF CONTENTS SECTION I - SUMMARY OF THE PROJECT BASIS FOR ASSESSMENTS SECTION II - PROJECT COSTS AND ASSESSMENTS SECTION I SUMMARY OF THE PROJECT BASIS FOR ASSESSMENTS SUMMARY OF THE PROJECT The work covered by this assessment report is the 2026 Downtown Improvements on Lodi Street (STH 60) in the City of Lodi. The work include s sanitary sewer, water main, and storm sewer improvements, 4 -inch and 6-inch concrete sidewalk, and concrete curb & gutter construction. Per the City of Lodi assessment policy, sidewalk (both 4 -inch and 6 -inch) and curb & gutter was assessed to the property owners at no more than 50% of the actual unit cost for construction of those items, including t he work items necessary to blend new sidewalk and curb & gutter to the existing yards and driveways. The plans, specifications and bidding documents which cover this work are under separate cover and are available at City Hall. The benefited properties are shown on the following pages. BASIS FOR ASSESSMENTS The assessable cost of all the curb & gutter, sidewalk, and all restoration (blending) between the sidewalks was added up and assessed to the property served by that section of sidewalk. A linear foot basis for curb & gutter and sidewalk assessments is a commonly recognized method for determining sidewalk benefits to adjacent properties . These benefits include drainage, appearance and longevity of adjacent surfaces sidewalk within intersections that are not assessed to any property. Curb & gutter is considered a direct benefit to adjacent properties because it provides for efficient drainage of runoff onto street right-of-way, without ditches which are troublesome to mow, particularly during wet periods. It avoids “rutting” of wheel p aths from vehicles which may park on the street frontages during wet soil conditions and the ponding areas which result from such wheel ruts. It provides a clean, visually pleasing line of demarcation between the traveled portion of the street and adjacent vegetated areas. Assessments are made on a proportional front foot basis for curb & gutter. On this basis, the total cost of all the curb & gutter and all restoration (blending) behind the curb & gutter, including the curb radii at intersections, was add ed up and divided among the benefited properties in proportion to the percent of each property’s benefited front footage as compared to the total front footage of all benefited parcels. This is a fair and reasonable method of assessment because curb & gutter could be designed and located to minimize costs to, and physically blend with, any individual property, to the detriment of other properties. Spreading all costs within a single project area over the entire benefited frontage promotes the location and d esign of curb & gutter in the best interests of the general public welfare as opposed to the welfare of any individual property owner. A lineal foot basis for curb & gutter assessments is a commonly recognized method for determining curb & gutter benefits to adjacent properties, such benefits being drainage, appearance and longevity of adjacent surfaces. The City of Lodi assessment policy is that 50% of the costs of sidewalk and curb & gutter are charged to the property owners abutting the improvements on the basis of front footage. Two-sided lots are assessed for 50% of the side which is greater in length. Storm sewer and drainage swales and appurtenances are not assessed. Assessments for sidewalk and curb & gutter are made for 50% of the cost for excavation, new concrete sidewalk, base course beneath the sidewalk, and restoration of all adjacent vegetated (where applicable and paved areas which must be disturbed to properly blend the sidewalk to existing features. The City of Lodi policy is to use 4 -inch-thick sidewalk in pedestrian areas and 6-inch-thick sidewalk in vehicle areas (across driveways). All curb & gutter will be 30-inch wide new concrete. In some areas residents may have chosen to also replace additional sidewalk and driveways. These areas were only reconstructed at the homeowner’s request and 100% of the associated costs will be assessed to that particular property owner. Final assessable amounts were determined by inspecting the project once construction was completed and determining exactly the quantities of 4-inch sidewalk, 6-inch sidewalk and curb & gutter installed. The assessable improvements are being constructed as a part of a street and utilities improvements project. Plans and specifications for the project are available at City Hall. The assessable costs, benefited properties ,and final assessments are found in Section II. SECTION II PROJECT COSTS AND FINAL ASSESSMENTS (using bid prices and final measured quantities) 4" Concrete Sidewalk - Sample cost for 100 linear feet (assumes 5-foot width) UNIT SUBTOTAL ITEM COST COST Excavation for New 4" Sidewalk* 15.4 cu. yds. $0.00 $0.00 New 4" Sidewalk 500 sq. ft. $5.56 $2,780.00 18.56 tons $17.20 $319.28 Topsoil Restoration, including 44.4 sq. yds. $30.00 $1,333.33 Seeding, Fertilizing, & Mulching SUBTOTAL $4,432.61 CONTINGENCY @ 10% $443.26 ENGINEERING @ 13% $576.24 TOTAL $5,452.11 Total Assessable Length: 100.00 feet Total Assessable Costs: $2,726.06 (50%) Note: The total of the assessments will differ slightly due to rounding Cost per foot of sidewalk: $27.2606 / foot ASSESSABLE COSTS 2026 Downtown Improvements - Lodi Street City of Lodi, Wisconsin October 2026 NUMBER OF UNITS 3/4" Crushed Aggregate Base Course Under Sidewalk Page 1 of 2 6" Concrete Driveways - Sample cost for 100 linear feet (assumes 5-foot width) UNIT SUBTOTAL ITEM COST COST Excavation for New Concrete Driveway * 21.6 cu. yds. $0.00 $0.00 6" Concrete Driveway Pavement 500 sq. ft. $6.36 $3,180.00 24.75 tons $17.20 $425.70 SUBTOTAL $3,605.70 CONTINGENCY @ 10% $360.57 ENGINEERING @ 13% $468.74 TOTAL $4,435.01 Total Assessable Area: 100.00 sq. ft. Total Assessable Costs: $2,217.51 (50%) Note: The total of the assessments will differ slightly due to rounding Cost per square foot of conc. drive: $22.1751 / sq. foot Curb & Gutter - Sample cost for 100 lineal feet UNIT SUBTOTAL ITEM COST COST Excavation for Curb & Gutter 18.5 cu. yds. $0.00 $0.00 New 30" Concrete Curb & Gutter 100 Lin. Ft. $26.49 $2,649.00 4.95 tons $17.20 $85.14 SUBTOTAL $2,734.14 CONTINGENCY @ 10% $273.41 ENGINEERING @ 13% $355.44 TOTAL $3,362.99 Total Assessable Area: 100.00 sq. ft. Total Assessable Costs: $1,681.50 (50%) Note: The total of the assessments will differ slightly due to rounding Cost per square foot of Curb & Gutter: $16.8150 / sq. foot NUMBER OF UNITS 3/4" Crushed Aggregate Base Course Under Curb & Gutter Excavation for sidewalks and driveways is computed for the area directly beneath those surfaces. NUMBER OF UNITS 3/4" Crushed Aggregate Base Course Under Sidewalk Page 2 of 2 OWNER FRONTAGE DESCRIPTION PARCEL NUMBER FEET OF FRONTAGE PERCENT OF TOTALLodi Street, Northwest Side ASSOCIATED BANK OF LODI Lot 1, CSM 1086-5-78; also part of vacated Portage St 11246-74 116.00 10.12% 433 MAIN STREET GREEN BAY, WI 54301 (for 102 N MAIN ST) JT PETROLEUM LLC 11246-46 89.76 7.83% 10908 W MEQUON STREET MEQUON, WI 53092 (for 101 N MAIN ST) NATHAN M. GINDT 11246-45 33.00 2.88% 404 CLARK STREET LODI, WI 53555 (for 108 LODI ST) 11246-44 22.00 1.92% 130 S MAIN ST, W10996 COUNTY ROAD J LODI, WI 53555 (for 11246-44) Lot 1, CSM 1176-5S-168 1126-40 110.00 9.60% 130 S MAIN ST LODI, WI 53555 (for 11246-40) I, the undersigned, do hereby state that it is my judgment that the properties listed below will benefit from, and will not be damaged by sidewalk, curb & gutter and driveway construction on Lodi Street (STH 60) from Water Street (STH 60) to Main Street (STH 113) in the City of Lodi, Wisconsin. Benefited Properties Lot 2, CSM 1176-5S-168CITY OF LODI (1/2), M&D PROPERTIES LODI LLC (1/2) CITY OF LODI Prt Lot 14, Blk 3, McClouds Add, Comm SE cor Lot 14, Blk 3, McCloud's Add, Wly on south line 33', Nly to North line, Ely 18', Sly 27', Ely 15', S to beg ALL OF LOT 15 & S 39 FT OF LOT 16-BLK 3-MCCLOUD'S 1ST ADD; Benefited Properties - Page 1 of 3 OWNER FRONTAGE DESCRIPTION PARCEL NUMBER FEET OF FRONTAGE PERCENT OF TOTALCLAY INVESTMENTS LLC 11246-39 106.00 9.25% N1841 RYAN ROAD LODI, WI 53555 (for 138 LODI ST) MARTY J. MISKULIN 11246-38 59.00 5.15% 142 LODI ST LODI, WI 53555 Lodi Street, Southeast Side RYAN A. AND STEPHANIE L. MAYER 11246-247.02 150.00 13.09% 205 LODI STREET LODI, WI 53555 139 LODI COMMERCIAL LLC 11246-273 122.00 10.65% 1124 QUINN DRIVE WAUNAKEE, WI 53597 (for 139 LODI ST) IT FLOATS LLC Outlot 173, Revised & Consolidated Plat of Lodi 11246-388 43.00 3.75% N225 FERRY VIEW CIRCLE LODI, WI 53555 (for 129 LODI ST) PKA PROPERTIES LLC 11246-387 45.00 3.93% W11404 HIGH POINT ROAD LODI, WI 53555 (for 125 LODI ST) DKM INVESTMENTS LLC 11246-386 29.00 2.53% W 11308 RED CEDAR DRIVE LODI, WI 53555 (for 119 LODI ST) Part of Lots 4-6, Blk 7, Lodi Addition No 1; also part of Outlot 170, Revised & Consolidated Plat of Lodi Prt OL62 & OL171, Revised & Consolidated Plat of Lodi, Comm E1/4 cor Sec 27, S89-03-57W 1422.87', S 682.24' to SE r/w Lodi St & POB, N50-34-12E 25.97', S39-28-56E 39.78', N49-16-08E 4.26', S39-37-56E 65.56', S52-13-42W .83', S39-25-48E 16.78', S50-34-12W 29.67', N39- 25-48W 122' to POB Lots 4 & 5, also Lots 9 & 10 Exc strip 98' front&rear off W end Lots 9 & 10, Blk 1, Lodi Add #1; ALSO Prt 98' strip off W end Lots 9 & 10, Blk 1, Lodi Add #1 described as, Comm in south boundary Lot 9 85' from SW cor, Nly 27-1/2' to center of walk, Ely 27' to stone wall, Sly parallel with Ely line to south boundary Lot 9, Wly along boundary to POB Lot 10, Blk 3, McClouds Add; Exc 7' off E side thereof 7 FT OFF E SIDE LOT 10-ALL OF LOT 11 & W1/2 OF LOT 12-BLK 3- MCCLOUD'S 1ST ADD; Outlot 172, and W 3' of Outlot 171,Revised & Consolidated Plat of Lodi Benefited Properties - Page 2 of 3 OWNER FRONTAGE DESCRIPTION PARCEL NUMBER FEET OF FRONTAGE PERCENT OF TOTALTWO BLACK DOGS LLC Lot 2, CSM 6239-45-91 11246-351.03 78.00 6.81% N2166 OKEE BAY COURT LODI, WI 53555 (for 109 LODI ST) KISMET DEVELOPMENT LLC 11246-352 34.00 2.97% 669 OAK RIDGE ROAD OREGON, WI 53575 (for 103 LODI ST & 106 S MAIN ST) SCREWBALL INVESTMENTS LLC 11246-353 109.00 9.51% 207 W MAIN STREET WAUNAKEE, WI 53597 (for 105 S MAIN ST) TOTALS 1145.76 100.00% Outlot 64, Revised & Consolidated Plat of Lodi Prt Outlot 69, Revised & Consolidated Plat of Lodi, Comm E1/4 cor Sec 27, S88-46-26W 1576.93', S29-56-56E 574.38', S31-47-23E 62.49' to POB, S29-55-12E 60', N60-04-48E 110', N29-55-12W 60', S60-04-48W 110' to POB Christian Reid, P.E. Benefited Properties - Page 3 of 3 Owner Tax Parcel Parcel Frontage Curb & Gutter Assessable Length (ft.) Corner Lot? (Y/N) Long Side? (Y/N) Assessable Curb & Gutter Cost ($16.82/L.F.) 4" Sidewalk Assessable Area (L.F.) Assessable 4" Sidewalk Cost ($27.26/L.F.) 6" Sidewalk Assessable Area (L.F.) Assessable 6" Sidewalk Cost ($22.18/L.F.) Total Assessable Cost Lodi Street, Northwest Side ASSOCIATED BANK OF LODI 11246-74 116.00 0 Y N $0.00 0 $0.00 0 $0.00 $0.00 433 MAIN STREET GREEN BAY, WI 54301 (for 102 N MAIN ST) JT PETROLEUM LLC 11246-46 89.76 89.76 Y N $1,509.31 39.76 $1,083.88 50 $1,108.75 $3,701.94 10908 W MEQUON STREET MEQUON, WI 53092 (for 101 N MAIN ST) NATHAN M. GINDT 11246-45 33.00 33 N $554.89 33 $899.60 0 $0.00 $1,454.49 404 CLARK STREET LODI, WI 53555 (for 108 LODI ST) 11246-44 22.00 22 N $369.93 0 $0.00 22 $487.85 $857.78 130 S MAIN ST, W10996 COUNTY ROAD J LODI, WI 53555 (for 11246-44) 130 S MAIN ST 1126-40 110.00 110 N $1,849.65 110 $2,998.66 0 $0.00 $4,848.31 LODI, WI 53555 (for 11246-40) Final Assessments 2026 Downtown Improvements - Lodi Street I, the undersigned, do hereby state that it is my judgment that the properties listed below will benefit from, and will not be damaged by sidewalk, curb & gutter and driveway construction on Lodi Street (STH 60) from Water Street (STH 60) to Main Street (STH 113) in the City of Lodi, Wisconsin. CITY OF LODI (1/2), M&D PROPERTIES LODI LLC (1/2) Owner Tax Parcel Parcel Frontage Curb & Gutter Assessable Length (ft.) Corner Lot? (Y/N) Long Side? (Y/N) Assessable Curb & Gutter Cost ($16.82/L.F.) 4" Sidewalk Assessable Area (L.F.) Assessable 4" Sidewalk Cost ($27.26/L.F.) 6" Sidewalk Assessable Area (L.F.) Assessable 6" Sidewalk Cost ($22.18/L.F.) Total Assessable Cost CLAY INVESTMENTS LLC 11246-39 106.00 106 N $1,782.39 90 $2,453.45 16 $354.80 $4,590.64 N1841 RYAN ROAD LODI, WI 53555 (for 138 LODI ST) MARTY J. MISKULIN 11246-38 59.00 34 N $571.71 34 $926.86 0 $0.00 $1,498.57 142 LODI ST LODI, WI 53555 Lodi Street, Southeast Side RYAN A. AND STEPHANIE L. MAYER 11246-247.02 150.00 0 Y Y $0.00 0 $0.00 0 $0.00 $0.00 205 LODI STREET LODI, WI 53555 139 LODI COMMERCIAL LLC 11246-273 122.00 100 Y Y $1,681.50 56.00 $1,526.59 70 $1,551.59 $4,759.68 1124 QUINN DRIVE WAUNAKEE, WI 53597 (for 139/141. LODI ST) IT FLOATS LLC 11246-388 43.00 43 N $723.04 43 $1,172.20 0 $0.00 $1,895.25 N225 FERRY VIEW CIRCLE LODI, WI 53555 (for 129 LODI ST) PKA PROPERTIES LLC 11246-387 45.00 45 N $756.67 45 $1,226.72 0 $0.00 $1,983.40 W11404 HIGH POINT ROAD LODI, WI 53555 (for 125 LODI ST) Owner Tax Parcel Parcel Frontage Curb & Gutter Assessable Length (ft.) Corner Lot? (Y/N) Long Side? (Y/N) Assessable Curb & Gutter Cost ($16.82/L.F.) 4" Sidewalk Assessable Area (L.F.) Assessable 4" Sidewalk Cost ($27.26/L.F.) 6" Sidewalk Assessable Area (L.F.) Assessable 6" Sidewalk Cost ($22.18/L.F.) Total Assessable Cost DKM INVESTMENTS LLC 11246-386 29.00 29 N $487.63 29 $790.56 0 $0.00 $1,278.19 W 11308 RED CEDAR DRIVE LODI, WI 53555 (for 119 LODI ST) TWO BLACK DOGS LLC 11246-351.03 78.00 78 N $1,311.57 78 $2,126.32 0 $0.00 $3,437.89 N2166 OKEE BAY COURT LODI, WI 53555 (for 109 LODI ST) KISMET DEVELOPMENT LLC 11246-352 34.00 34 Y N $571.71 34 $926.86 0 $0.00 $1,498.57 669 OAK RIDGE ROAD OREGON, WI 53575 (for 103 LODI ST & 106 S MAIN ST) SCREWBALL INVESTMENTS LLC 11246-353 109.00 0 Y Y $0.00 0 $0.00 0 $0.00 $0.00 207 W MAIN STREET WAUNAKEE, WI 53597 (for 105 S MAIN ST) TOTALS $12,170.00 $16,131.70 $3,502.99 $31,804.69 G:\00\00080\00080103\SPECIAL ASSESSMENTS\00080103 FINAL RESOLUTION.DOC RESOLUTION 26- 79 FINAL RESOLUTION AUTHORIZING PUBLIC IMPROVEMENT AND LEVYING SPECIAL ASSESSMENTS AGAINST BENEFITTED PROPERTY IN THE CITY OF LODI , WISCONSIN (FAIR ST) WHEREAS, the Common Council of the City of Lodi, Wi sconsin, held a public hearing at the Council Chambers in the City Hall building at 5 :3 0 p.m. on the 9 th day of September , 202 6 , for the purpose of hearing all interested persons concerning the preliminary resolution and report of the City Engineer on the proposed public improvements consisting of reconstructing Fair St , including sanitary sewer, water main, and storm sewer improvements, 4-inch and 6-inch concrete sidewalk, concrete curb & gutter construction, parking lot improvements, asphalt trail, and retaining wall construction. P reliminary assessments against benefited property , and heard all persons who desired to speak at the hearing; NOW, THEREFORE, BE IT RESOLVED, the Common Council of the City of Lodi, Wisconsin, determines as follows: 0. The final report of the City Engineer, a copy of which is attached hereto and incorporated herein as if fully set forth herein, including the plans and specifications and assessments set forth therein, is adopted and approved. 1. The City Engineer advertised for bids and construction of the improvements were completed in accordance with the report hereby adopted. 2. Payment for the improvements shall be made by assessing 50% of the total cost of the 4- inch and 6-inch sidewalk and concrete curb & gutter to the property benefited as indicated in the report . 3. Assessments shown on the report represent an exercise of the police power and have been determined on a reasonable basis and are hereby confirmed. 4. Assessments for all projects included in the report are hereby combined as a single assessment but any interested property owner may object to each assessment separately or all assessments jointly for any purpose. 5. Assessments shall be due within 30 days of billing date. Assessments may be paid in cash or in four (4) annual installments to the City Clerk. Installments shall be placed on the next tax roll after the due date for collection and shall bear interest at the rate of 5.0 % per annum on the unpaid balance from January 1 of the year following the levy . 6. The City Clerk shall publish this resolution as a Class 1 notice under ch. 985, Stats., in the assessment district and mail a copy of this resolution and a statement of the final assessment against the benefited property together with notice of installment payment privileges to every property owner whose name appears on the assessment roll whose post office address is known or can with reasonable diligence be ascertained. Dated ______________________ Signed ____________________________________ Thomas Marx , Mayor Published ___________________ Attest _____________________________________ Arissa Watkins, City Clerk TOWN & COUNTRY ENGINEERING, INC. Madison ⧫ Rhinelander ⧫ Kenosha ⧫ Platteville 6264 Nesbitt Road • Madison, WI 53719 • (608) 273-3350 • tce@tcengineers.net FINAL ASSESSMENT REPORT 2026 STREET & UTILITY IMPROVEMENTS Fair Street (Plans and Specifications under separate cover are available at the Office of the City Clerk and are a part of this report) City of Lodi, Wisconsin November 2026 TABLE OF CONTENTS SECTION I - SUMMARY OF THE PROJECT BASIS FOR ASSESSMENTS SECTION II - PROJECT COSTS AND ASSESSMENTS SECTION I SUMMARY OF THE PROJECT BASIS FOR ASSESSMENTS SUMMARY OF THE PROJECT The work covered by this assessment report is the 2026 Street and Utility Improvements on Fair Street in the City of Lodi. The work include d sanitary sewer, water main, and storm sewer improvements, 4-inch and 6 -inch concrete sidewalk, concrete curb & gutter construction , parking lot improvements, asphalt trail, and retaining wall construction . Per the City of Lodi assessment policy, sidewalk (both 4-inch and 6-inch) and curb & gutter were assessed to the property owners at no more than 50% of the actual unit cost for construction of those items, including the work items necessary to blend new sidewalk and curb & gutter to the existing yards and driveways. The plans, specifications and bidding documents which cover this work are under separate cover and are available at City Hall. The benefited properties are shown on the following pages. BASIS FOR ASSESSMENTS The assessable cost of all the curb and gutter, sidewalk, and all restoration (blending) between the sidewalks was added up and assessed to the property served by that section of sidewalk. A linear foot basis for cub & gutter and a square foot basis for sidewalk assessments is a commonly recognized method for determining benefits to adjacent properties, such benefits being drainage, appearance, and longevity of adjacent surfaces sidewalk within intersections are not assessed to any property. Curb & gutter is considered a direct benefit to adjacent properties because it provides for efficient drainage of runoff onto street right-of-way, without ditches which are troublesome to mow, particularly during wet periods. It avoids “rutting” of wheel p aths from vehicles which may park on the street frontages during wet soil conditions and the ponding areas which result from such wheel ruts. It provides a clean, visually pleasing line of demarcation between the traveled portion of the street and adjacent vegetated areas. Assessments are made on a proportional front foot basis for curb & gutter. On this basis, the total cost of all the curb & gutter and all restoration (blending) behind the curb & gutter, including the curb radii at intersections, was add ed up and divided among the benefited properties in proportion to the percent of each property’s benefited front footage as compared to the total front footage of all benefited parcels. This is a fair and reasonable method of assessment because curb & gutter could be designed and located to minimize costs to, and physically blend with, any individual property, to the detriment of other properties. Spreading all costs within a single project area over the entire benefited frontage promotes the location and d esign of curb & gutter in the best interests of the general public welfare as opposed to the welfare of any individual property owner. A lineal foot basis for curb & gutter assessments is a commonly recognized method for determining curb & gutter benefits to adjacent properties, such benefits being drainag e, appearance and longevity of adjacent surfaces. All curb & gutter is 30-inch wide new concrete. Assessments for curb & gutter and sidewalk are made for 50% of the cost for excavation, new concrete sidewalk, base course beneath the sidewalk, and restoration of all adjacent vegetated and paved areas which must be disturbed to properly blend the sidewalk to existing features. The City of Lodi polic y is to use 4 -inch-thick sidewalk in pedestrian areas and 6-inch-thick sidewalk in vehicle areas (across driveways). The City of Lodi assessment policy is that 50% of the costs of sidewalk and curb & gutter will be charged to the property owners abutting the improvements on the basis of front footage. Two-sided lots are assessed for 50% of the side which is greater in length. Storm sewer and drainage swales and appurtenances are not assessed. Final assessable amounts were determined by inspecting the project once construction was complete and determined exactly the quantities of 4 -inch sidewalk, 6-inch sidewalk and curb & gutter installed. The assessable improvements were constructed as a part of a street and utilities improvements project. Plans and specifications for the project are available at City Hall. The assessable final cost calculations benefited properties and final estimates are shown in Section II. SECTION II PROJECT COSTS AND FINAL ASSESSMENTS (using bid prices and planned quantities) 4" Concrete Sidewalk - Final Cost for 500 linear feet (assumes 5 ft. width) UNIT SUBTOTAL ITEM COST COST Excavation for New 4" Sidewalk* 15.4 cu. yds. $0.00 $0.00 New 4" Sidewalk 500 sq. ft. $5.56 $2,780.00 18.56 tons $15.50 $287.72 Topsoil Restoration, including 44.4 sq. yds. $5.50 $244.44 Seeding, Fertilizing, & Mulching SUBTOTAL $3,312.16 CONTINGENCY @ 10% $331.22 ENGINEERING @ 13% $430.58 TOTAL $4,073.96 Total Assessable Length: 500.00 Square feet Total Assessable Costs: $2,036.98 (50%) Note: The total of the assessments will differ slightly due to rounding Cost per sqaure foot of sidewalk: $4.0740 / foot ASSESSABLE COSTS 2026 STREET UTILITY AND STREET IMPROVEMENTS - Fair Street City of Lodi, Wisconsin November 2026 NUMBER OF UNITS 3/4" Crushed Aggregate Base Course Under Sidewalk Page 1 of 2 6" Concrete Driveways - Final Cost for 100 square feet UNIT SUBTOTAL ITEM COST COST Excavation for New Concrete Driveway * 21.6 cu. yds. $0.00 $0.00 6" Concrete Driveway Pavement 500 sq. ft. $6.06 $3,030.00 24.75 tons $15.50 $383.63 Topsoil Restoration, including 0.0 sq. yds. $5.50 $0.00 Seeding, Fertilizing, & Mulching SUBTOTAL $3,413.63 CONTINGENCY @ 10% $341.36 ENGINEERING @ 13% $443.77 TOTAL $4,198.76 Total Assessable Area: 500.00 sq. ft. Total Assessable Costs: $2,099.38 (50%) Note: The total of the assessments will differ slightly due to rounding Cost per square foot of conc. drive: $4.1988 / sq. foot Curb & Gutter - Final Cost for 100 Lineal feet UNIT SUBTOTAL ITEM COST COST Excavation for Curb & Gutter 18.5 cu. yds. $0.00 $0.00 New 30" Concrete Curb & Gutter 100 Lin. Ft. $20.35 $2,035.00 4.95 tons $15.50 $76.73 Topsoil Restoration, including 33.3 sq. yds. $5.50 $183.33 Seeding, Fertilizing, & Mulching SUBTOTAL $2,295.06 CONTINGENCY @ 10% $229.51 ENGINEERING @ 13% $298.36 TOTAL $2,822.92 Total Assessable Length: 100.00 Lineal Feet Total Assessable Costs: $1,411.46 (50%) Note: The total of the assessments will differ slightly due to rounding Cost per square foot of Curb & Gutter: $14.1146 /Lin. Ft. NUMBER OF UNITS 3/4" Crushed Aggregate Base Course Under Curb & Gutter Excavation for sidewalks and driveways is computed for the area directly beneath those surfaces. NUMBER OF UNITS 3/4" Crushed Aggregate Base Course Under Sidewalk Page 2 of 2 OWNER FRONTAGE DESCRIPTION PARCEL NUMBER FEET OF FRONTAGE PERCENT OF TOTAL Fair Street, East Side CITY OF LODI Part of Outlot 134, Revised & Consolidated Plat of Lodi 11246-143 123.87 2.17% 130 S MAIN STREET LODI, WI 53555 (for 401 FAIR STREET) DUANE H. AND RHONDA L. STOLTENBERG  11246-140 49.57 0.87% 202 MILLSTON AVENUE LODI, WI 53555 (for 202 MILLSTON AVENUE) CITY OF LODI LT 1 CS#3319-22-55 11246-139.01 151.69 2.66% 130 S MAIN STREET LODI, WI 53555 (for 501 FAIR STREET) 11246-138 378.04 6.63% 521 FAIR STREET LODI, WI 53555 (for 521 AND 515 FAIR STREET) 11246-137 92.00 1.61% 521 FAIR STREET LODI, WI 53555 (for 11246-137) Benefited Properties Part of Outlots 133 & 134, Revised & Consolidated Plat of Lodi Outlot 130, Revised & Consolidated Plat of Lodi; also part of OL 132 as per V103-240 BLESSED TRINITY CONGREGATION, COLUMBIA/DANE COUTY, WI INC. BLESSED TRINITY CONGREGATION, COLUMBIA/DANE COUTY, WI INC. Outlot 128, Revised & Consolidated Plat of Lodi; exc 10' strip off E end; exc pcl comm at pt on SLY mgn Pond St, 92' from E ln of Outlot 128; SELY at right angles 60'; SWLY at right agnles in straight line to Fair St; NWLY alg Fair St to Pond St; th alg Pond St to POB I, the undersigned, do hereby state that it is my judgment that the properties listed below will benefit from, and will not be damaged by curb & gutter, sidewalk and driveway construction on Fair Street from Spring Creek to Northernly city of Lodi municpal limit in the City of Lodi, Wisconsin. Benefited Properties - Page 1 of 3 OWNER FRONTAGE DESCRIPTION PARCEL NUMBER FEET OF FRONTAGE PERCENT OF TOTAL MERCY DENTAL PROPERTIES LLC Lot 1, CSM 1283-6-45 11246-137.A 60.00 1.05% 2921 LANDMARK PLACE SUITE 420 MADISON, WI 53713 (for 204 POND STREET) RUSSEL J. AND HANNAH M. BUSH 11246-129 137.73 2.41% 205 POND STREET LODI, WI 53555 (for 205 POND STREET) TESSA R. WINGERS 11246-130 59.97 1.05% 612 FAIR STREET LODI, WI 53555 (for 612 FAIR STREET) JAMES F. AND JACKIE R. STEIGER 11246-128 86.76 1.52% 616 FAIR STREET LODI, WI 53555 (for 616 FAIR STREET) CHARLES B. PHIPPS Lot 1, CSM 456-2-231 11246-126 90.00 1.58% 620 FAIR STREET LODI, WI 53555 (for 620 FAIR STREET) MICHAEL J. AND DANIEL A. BENISH 11246-127 108.69 1.91% W11085 COUNTY ROAD V LODI, WI 53555 (for 624 FAIR STREET) Part of OL 121, Revised & Consolidated Plat, V Lodi, now C Lodi, described as follows: Comm at the SW cor of said OL at junction of ELY mar of Fair St and NLY mar of Pond St; NELY alg mar of Pond St 6 rods; NWLY on a ln par with Fair St to the NWLY ln of said OL 121; SWLY alg NWLY ln of said OL 121 to the ELY mar of Fair St; SELY to POB. Exc land described in V211-221 Part of OL 121, Revised & Consolidated Plat of V Lodi, now C Lodi, described as follows: Comm at the NW cor of said OL 121 on the mar of Fair St; SELY alg the mar of Fair St, 60'; thence at right angles par with the S ln of OL 121 of the W ln of land described in V229-211; NWLY alg said last mentioned ln to the N ln of OL 121; SWLY alg NLY ln of said OL to POB. Outlot 120 and part of Outlot 117, Revised & Conslidated Plat of Lodi, desc as follows: beg on E ln Fair St at SW corn OL 119; th SLY 86.7' to SW cor of OL 120; ELY at right angles 140'; NLY at right angles 71.85'; WLY 141.55' to POB Outlot 118, Revised & Consolidated Plat of Lodi; being pcl in NW1/4 of NE1/4, 4 rods N/S and 8 rods long E/W lying E of Fair St and S of Elizabeth St; also pcl adj, being part of Outlot 119, Revised & Consolidated Plat of Lodi; com SW cor OL 118; ELY to SE cor; S 1 rod and 11' 7"; WLY to pt on marg Fair St, 2 rods and 3' 4" S of POB; NLY alg Fair St to POB Benefited Properties - Page 2 of 3 OWNER FRONTAGE DESCRIPTION PARCEL NUMBER FEET OF FRONTAGE PERCENT OF TOTAL WAYNE J. KARLS 144.57 2.53% 201 ELIZABETH STREET LODI, WI 53555 (for 201 ELIZABETH STREET) LODI AGRICULTURAL FAIR INC. Outlot 106, Revised & Consolidated Plat of Lodi 11246-115 756.62 13.26% PO BOX 302 LODI, WI 53555 (for 700 FAIR STREET) LODI AGRICULTURAL FAIR INC. 11246-2005 21.10 0.37% PO BOX 302 LODI, WI 53555 (for 11246-2005) PAUL A. GROVER AND JANEEN A. MEYER-GROVER 11246-195.H 187.77 3.29% 710 FAIR STREET LODI, WI 53555 (for 710 FAIR STREET) Fair Street, West Side LEE TRUST DATED 3/22/1995 11246-195.I 767.70 13.46% C/O STEVE AND SHEILA VAN LANKVELT 709 FAIR STREET LODI, WI 53555 (for 709 FAIR STREET) CITY OF LODI 11246-116.01 2488.00 43.62% 130 S MAIN STREET LODI, WI 53555 (for 510 , 610, and 710 FAIR STREET) TOTALS 5704.08 100.00% PRT SW 1/4 SE 1/4, COM E MGN FAIR ST & S LN S.22, E64 RDS 11 LNKS N12 RDS W TO E LN HWY S TO POB, see exceptions 178 FT ON FAIR STREET. LOC SW1/4 SE1/4 COM 20' N S LN S22 IN C/L FAIR ST E240' N178 W TO C/L, S TO BEG. ASSR. (N1304 FAIR) Christian Reid, P.E. PRT E 1/2 SESW & W 1/2 SWSE; ALL THAT PRT OF PCL BTWN SPRING CR & C/L OF FAIR ST; COM SW COR E1/2 SE SW; N716' E TO C/L FAIR ST; S19 E TO S LN S.22; W TO POB. ANNEXED INTO THE CITY OF LODI 5-6-86 S-2 6 Outlots 107-110, 131 & 153, Revised & Consolidated Plat of Lodi (Goeres Park), see exceptions Part of Outlot 114, Revised & Consolidated Plat of Lodi; 64 sq rods off W end lying W and being bounded on E by ln running N & S through sd lot at right angles to Elizabeth St and far enough E from Fair St to set off 64 sq rods Benefited Properties - Page 3 of 3 Owner Tax Parcel Parcel Frontage Curb & Gutter Assessable Length (ft.) Corner Lot? (Y/N) Long Side? (Y/N) Assessable Curb & Gutter Cost ($14.11/L.F.) 4" Sidewalk Assessable Area (sqft.) Assessable 4" Sidewalk Cost ($4.07/Sq. Ft.) 6" Sidewalk Assessable Area (sqft.) Assessable 6" Sidewalk Cost ($4.20/Sq. Ft.) Total Assessable Cost Fair Street, East Side CITY OF LODI 11246-143 123.87 18.3 N $258.30 123.3 $502.32 0.0 $0.00 $760.62 130 S MAIN STREET LODI, WI 53555 (for 401 FAIR STREET) DUANE H. AND RHONDA L. STOLTENBERG 11246-140 49.57 0.0 Y N $0.00 0.0 $0.00 0.0 $0.00 $0.00 202 MILLSTON AVENUE LODI, WI 53555 (for 202 MILLSTON AVENUE) CITY OF LODI 11246-139.01 151.69 114.0 Y N $1,609.07 83.0 $338.14 0.0 $0.00 $1,947.20 130 S MAIN STREET LODI, WI 53555 (for 501 FAIR STREET) BLESSED TRINITY CONGREGATION, COLUMBIA/DANE COUTY, WI INC.11246-138 378.04 378.0 N $5,335.89 154.1 $627.67 0.0 $0.00 $5,963.57 521 FAIR STREET LODI, WI 53555 (for 521 AND 515 FAIR STREET) BLESSED TRINITY CONGREGATION, COLUMBIA/DANE COUTY, WI INC.11246-137 92.00 92.0 N $1,298.54 0.0 $0.00 0.0 $0.00 $1,298.54 521 FAIR STREET LODI, WI 53555 (for 11246-137) Final Assessments 2026 STREET UTILITY AND STREET IMPROVEMENTS - Fair Street I, the undersigned, do hereby state that it is my judgment that the properties listed below will benefit from, and will not be damaged by curb & gutter, sidewalk and driveway construction on Fair Street from Spring Creek to Northernly city of Lodi municpal limit in the City of Lodi, Wisconsin. 2024 Street and Utility Improvements Page 1 of 3 Owner Tax Parcel Parcel Frontage Curb & Gutter Assessable Length (ft.) Corner Lot? (Y/N) Long Side? (Y/N) Assessable Curb & Gutter Cost ($14.11/L.F.) 4" Sidewalk Assessable Area (sqft.) Assessable 4" Sidewalk Cost ($4.07/Sq. Ft.) 6" Sidewalk Assessable Area (sqft.) Assessable 6" Sidewalk Cost ($4.20/Sq. Ft.) Total Assessable Cost MERCY DENTAL PROPERTIES LLC 11246-137.A 60.00 60.0 Y Y $846.88 107.7 $438.77 0.0 $0.00 $1,285.64 2921 LANDMARK PLACE SUITE 420 MADISON, WI 53713 (for 204 POND STREET) RUSSEL J. AND HANNAH M. BUSH 11246-129 137.73 137.7 Y Y $1,944.01 196.7 $801.35 86.6 $363.61 $3,108.97 205 POND STREET LODI, WI 53555 (for 205 POND STREET) TESSA R. WINGERS 11246-130 59.97 60.0 N $846.45 61.9 $252.18 0.0 $0.00 $1,098.63 612 FAIR STREET LODI, WI 53555 (for 612 FAIR STREET) JAMES F. AND JACKIE R. STEIGER 11246-128 86.76 86.8 N $1,224.58 73.6 $299.84 0.0 $0.00 $1,524.43 616 FAIR STREET LODI, WI 53555 (for 616 FAIR STREET) CHARLES B. PHIPPS 11246-126 90.00 90.0 N $1,270.32 106.5 $433.88 0.0 $0.00 $1,704.19 620 FAIR STREET LODI, WI 53555 (for 620 FAIR STREET) MICHAEL J. AND DANIEL A. BENISH 11246-127 108.69 108.7 Y N $1,534.12 97.3 $396.40 0.0 $0.00 $1,930.51 W11085 COUNTY ROAD V LODI, WI 53555 (for 624 FAIR STREET) WAYNE J. KARLS 11246-122 144.57 144.6 Y Y $2,040.55 95.5 $389.06 0.0 $0.00 $2,429.61 201 ELIZABETH STREET LODI, WI 53555 (for 201 ELIZABETH STREET) 2024 Street and Utility Improvements Page 2 of 3 Owner Tax Parcel Parcel Frontage Curb & Gutter Assessable Length (ft.) Corner Lot? (Y/N) Long Side? (Y/N) Assessable Curb & Gutter Cost ($14.11/L.F.) 4" Sidewalk Assessable Area (sqft.) Assessable 4" Sidewalk Cost ($4.07/Sq. Ft.) 6" Sidewalk Assessable Area (sqft.) Assessable 6" Sidewalk Cost ($4.20/Sq. Ft.) Total Assessable Cost LODI AGRICULTURAL FAIR INC. 11246-115 756.62 517.2 N $7,300.08 425.1 $1,731.84 0.0 $0.00 $9,031.92 PO BOX 302 LODI, WI 53555 (for 700 FAIR STREET) LODI AGRICULTURAL FAIR INC. 11246-2005 21.10 0.0 N $0.00 0.0 $0.00 0.0 $0.00 $0.00 PO BOX 302 LODI, WI 53555 (for 11246-2005) PAUL A. GROVER AND JANEEN A. MEYER-GROVER11246-195.H 187.77 0.0 N $0.00 0.0 $0.00 440.7 $1,850.40 $1,850.40 710 FAIR STREET LODI, WI 53555 (for 710 FAIR STREET) Fair Street, West Side LEE TRUST DATED 3/22/1995 11246-195.I 767.70 0.0 N $0.00 0.0 $0.00 0.0 $0.00 $0.00 C/O STEVE AND SHEILA VAN LANKVELT 709 FAIR STREET LODI, WI 53555 (for 709 FAIR STREET) CITY OF LODI 11246-116.01 2488.00 1783.3 Y Y $25,170.60 6767.7 $27,571.24 38.6 $162.07 $52,903.91 130 S MAIN STREET LODI, WI 53555 (for 510 AND 610 FAIR STREET) TOTALS $3,590.56 $50,679.39 $33,782.68 $2,376.08 $86,838.14 2024 Street and Utility Improvements Page 3 of 3

Source: City of Lodi website. First collected Nov 9, 2026.