Common Council Agenda - Special Meeting
Call To Order
Roll Call
Final Resolution Authorizing Public Improvement And Levying Special Assessments
Against Benefitted Property In The City Of Lodi, Wisconsin (Hwy 60)
RESOLUTION 26-78 AUTHORIZING PUBLIC IMPROVEMENTS AND LEVYING
SPECIAL ASSESSMENTS (HWY 60).PDF
FINAL ASSESSMENT REPORT - 2026 DOWNTOWN IMPROVEMENTS.PDF
Final Resolution Authorizing Public Improvement And Levying Special Assessments
Against Benefitted Property In The City Of Lodi, Wisconsin (Fair St)
RESOLUTION 26-79 AUTHORIZING PUBLIC IMPROVEMENTS AND LEVYING
SPECIAL ASSESSMENTS (FAIR ST).PDF
Adjourn
Posted:_________________
By:_____________________
Members: Mayor Marx, Alder Crow, Alder Flanagan, Alder Kutz, Alder Heller, Alder Ripp, Alder Stevenson
(President)
Agendas may change up to 24 hours prior to the commencement of the meeting. Reasonable
accommodations for persons with disabilities may be made in advance by calling City Hall at 608 -592-
3247.
PLEASE TAKE NOTICE: There will be a City of Lodi
Common Council meeting Thursday, November 5, 2026 at
4:00 pm in the City Hall Council Room, 130 South Main
Street, Lodi, WI.
Meeting Link: https://events.gcc.teams.microsoft.com/event/1cdcac95-a58b-47a9-bf44-
52f4c95b9aec@b47e60e2-f56b-4da2-a329-4ba078adf6b9?
source=copyLinkOneEventsShareDialog
1.
2.
3.
Documents:
4.
Documents:
5.
G:\00\00080\00080103\SPECIAL ASSESSMENTS\00080103 FINAL RESOLUTION.DOC
RESOLUTION 26- 78
FINAL RESOLUTION AUTHORIZING PUBLIC IMPROVEMENT AND
LEVYING SPECIAL ASSESSMENTS AGAINST BENEFITTED PROPERTY
IN THE CITY OF LODI , WISCONSIN (HWY 60)
WHEREAS, the Common Council of the City of Lodi, Wi sconsin, held a public hearing at the Council
Chambers in the City Hall building at 5 :3 0 p.m. on the 9 th day of September , 202 6 , for the purpose of
hearing all interested persons concerning the preliminary resolution and report of the City Engineer on the
proposed public improvements consisting of reconstructing Highway 60 , including sanitary sewer, water
main, and storm sewer improvements, 4-inch and 6-inch concrete sidewalk, and concrete curb & gutter
construction. P reliminary assessments against benefited property , and heard all persons who desired to
speak at the hearing;
NOW, THEREFORE, BE IT RESOLVED, the Common Council of the City of Lodi, Wisconsin,
determines as follows:
0. The final report of the City Engineer, a copy of which is attached hereto and incorporated
herein as if fully set forth herein, including the plans and specifications and assessments set forth therein,
is adopted and approved.
1. The City Engineer advertised for bids and construction of the improvements were
completed in accordance with the report hereby adopted.
2. Payment for the improvements shall be made by assessing 50% of the total cost of the 4-
inch and 6-inch sidewalk and concrete curb & gutter to the property benefited as indicated in the report .
3. Assessments shown on the report represent an exercise of the police power and have been
determined on a reasonable basis and are hereby confirmed.
4. Assessments for all projects included in the report are hereby combined as a single
assessment but any interested property owner may object to each assessment separately or all assessments
jointly for any purpose.
5. Assessments shall be due within 30 days of billing date. Assessments may be paid in cash
or in four (4) annual installments to the City Clerk. Installments shall be placed on the next tax roll after
the due date for collection and shall bear interest at the rate of 5.0 % per annum on the unpaid balance
from January 1 of the year following the levy .
6. The City Clerk shall publish this resolution as a Class 1 notice under ch. 985, Stats., in
the assessment district and mail a copy of this resolution and a statement of the final assessment against
the benefited property together with notice of installment payment privileges to every property owner
whose name appears on the assessment roll whose post office address is known or can with reasonable
diligence be ascertained.
Dated ______________________ Signed ____________________________________
Thomas Marx , Mayor
Published ___________________
Attest _____________________________________
Arissa Watkins, City Clerk
TOWN & COUNTRY ENGINEERING, INC.
Madison ⧫ Rhinelander ⧫ Kenosha ⧫ Platteville
6264 Nesbitt Road • Madison, WI 53719 • (608) 273-3350 • tce@tcengineers.net
FINAL
ASSESSMENT REPORT
2026 DOWNTOWN IMPROVEMENTS
STH 60
(Plans and Specifications under separate cover are available at the
Office of the City Clerk and are a part of this report)
City of Lodi, Wisconsin
October 2026
TABLE OF CONTENTS
SECTION I - SUMMARY OF THE PROJECT
BASIS FOR ASSESSMENTS
SECTION II - PROJECT COSTS AND ASSESSMENTS
SECTION I
SUMMARY OF THE PROJECT
BASIS FOR ASSESSMENTS
SUMMARY OF THE PROJECT
The work covered by this assessment report is the 2026 Downtown Improvements on
Lodi Street (STH 60) in the City of Lodi.
The work include s sanitary sewer, water main, and storm sewer improvements, 4 -inch
and 6-inch concrete sidewalk, and concrete curb & gutter construction. Per the City of
Lodi assessment policy, sidewalk (both 4 -inch and 6 -inch) and curb & gutter was
assessed to the property owners at no more than 50% of the actual unit cost for
construction of those items, including t he work items necessary to blend new sidewalk
and curb & gutter to the existing yards and driveways.
The plans, specifications and bidding documents which cover this work are under
separate cover and are available at City Hall.
The benefited properties are shown on the following pages.
BASIS FOR ASSESSMENTS
The assessable cost of all the curb & gutter, sidewalk, and all restoration (blending)
between the sidewalks was added up and assessed to the property served by that section
of sidewalk. A linear foot basis for curb & gutter and sidewalk assessments is a commonly
recognized method for determining sidewalk benefits to adjacent properties . These
benefits include drainage, appearance and longevity of adjacent surfaces sidewalk within
intersections that are not assessed to any property.
Curb & gutter is considered a direct benefit to adjacent properties because it provides for
efficient drainage of runoff onto street right-of-way, without ditches which are troublesome
to mow, particularly during wet periods. It avoids “rutting” of wheel p aths from vehicles
which may park on the street frontages during wet soil conditions and the ponding areas
which result from such wheel ruts. It provides a clean, visually pleasing line of
demarcation between the traveled portion of the street and adjacent vegetated areas.
Assessments are made on a proportional front foot basis for curb & gutter. On this basis,
the total cost of all the curb & gutter and all restoration (blending) behind the curb & gutter,
including the curb radii at intersections, was add ed up and divided among the benefited
properties in proportion to the percent of each property’s benefited front footage as
compared to the total front footage of all benefited parcels. This is a fair and reasonable
method of assessment because curb & gutter could be designed and located to minimize
costs to, and physically blend with, any individual property, to the detriment of other
properties. Spreading all costs within a single project area over the entire benefited
frontage promotes the location and d esign of curb & gutter in the best interests of the
general public welfare as opposed to the welfare of any individual property owner. A
lineal foot basis for curb & gutter assessments is a commonly recognized method for
determining curb & gutter benefits to adjacent properties, such benefits being drainage,
appearance and longevity of adjacent surfaces.
The City of Lodi assessment policy is that 50% of the costs of sidewalk and curb & gutter
are charged to the property owners abutting the improvements on the basis of front
footage. Two-sided lots are assessed for 50% of the side which is greater in length. Storm
sewer and drainage swales and appurtenances are not assessed.
Assessments for sidewalk and curb & gutter are made for 50% of the cost for excavation,
new concrete sidewalk, base course beneath the sidewalk, and restoration of all adjacent
vegetated (where applicable and paved areas which must be disturbed to properly blend
the sidewalk to existing features. The City of Lodi policy is to use 4 -inch-thick sidewalk
in pedestrian areas and 6-inch-thick sidewalk in vehicle areas (across driveways). All curb
& gutter will be 30-inch wide new concrete.
In some areas residents may have chosen to also replace additional sidewalk and
driveways. These areas were only reconstructed at the homeowner’s request and 100%
of the associated costs will be assessed to that particular property owner.
Final assessable amounts were determined by inspecting the project once construction
was completed and determining exactly the quantities of 4-inch sidewalk, 6-inch sidewalk
and curb & gutter installed. The assessable improvements are being constructed as a
part of a street and utilities improvements project. Plans and specifications for the project
are available at City Hall.
The assessable costs, benefited properties ,and final assessments are found in Section
II.
SECTION II
PROJECT COSTS AND FINAL ASSESSMENTS
(using bid prices and final measured quantities)
4" Concrete Sidewalk - Sample cost for 100 linear feet (assumes 5-foot width)
UNIT SUBTOTAL
ITEM COST COST
Excavation for New 4" Sidewalk* 15.4 cu. yds. $0.00 $0.00
New 4" Sidewalk 500 sq. ft. $5.56 $2,780.00
18.56 tons $17.20 $319.28
Topsoil Restoration, including 44.4 sq. yds. $30.00 $1,333.33
Seeding, Fertilizing, & Mulching
SUBTOTAL $4,432.61
CONTINGENCY @ 10% $443.26
ENGINEERING @ 13% $576.24
TOTAL $5,452.11
Total Assessable Length: 100.00 feet
Total Assessable Costs: $2,726.06 (50%)
Note: The total of the assessments will differ slightly due to rounding
Cost per foot of sidewalk: $27.2606 / foot
ASSESSABLE COSTS
2026 Downtown Improvements - Lodi Street
City of Lodi, Wisconsin
October 2026
NUMBER OF UNITS
3/4" Crushed Aggregate Base Course Under Sidewalk
Page 1 of 2
6" Concrete Driveways - Sample cost for 100 linear feet (assumes 5-foot width)
UNIT SUBTOTAL
ITEM COST COST
Excavation for New Concrete Driveway * 21.6 cu. yds. $0.00 $0.00
6" Concrete Driveway Pavement 500 sq. ft. $6.36 $3,180.00
24.75 tons $17.20 $425.70
SUBTOTAL $3,605.70
CONTINGENCY @ 10% $360.57
ENGINEERING @ 13% $468.74
TOTAL $4,435.01
Total Assessable Area: 100.00 sq. ft.
Total Assessable Costs: $2,217.51 (50%)
Note: The total of the assessments will differ slightly due to rounding
Cost per square foot of conc. drive: $22.1751 / sq. foot
Curb & Gutter - Sample cost for 100 lineal feet
UNIT SUBTOTAL
ITEM COST COST
Excavation for Curb & Gutter 18.5 cu. yds. $0.00 $0.00
New 30" Concrete Curb & Gutter 100 Lin. Ft. $26.49 $2,649.00
4.95 tons $17.20 $85.14
SUBTOTAL $2,734.14
CONTINGENCY @ 10% $273.41
ENGINEERING @ 13% $355.44
TOTAL $3,362.99
Total Assessable Area: 100.00 sq. ft.
Total Assessable Costs: $1,681.50 (50%)
Note: The total of the assessments will differ slightly due to rounding
Cost per square foot of Curb & Gutter: $16.8150 / sq. foot
NUMBER OF UNITS
3/4" Crushed Aggregate Base Course Under Curb & Gutter
Excavation for sidewalks and driveways is computed for the area directly beneath those surfaces.
NUMBER OF UNITS
3/4" Crushed Aggregate Base Course Under Sidewalk
Page 2 of 2
OWNER FRONTAGE DESCRIPTION PARCEL
NUMBER
FEET OF
FRONTAGE
PERCENT
OF TOTALLodi Street, Northwest Side
ASSOCIATED BANK OF LODI Lot 1, CSM 1086-5-78; also part of vacated Portage St 11246-74 116.00 10.12%
433 MAIN STREET
GREEN BAY, WI 54301
(for 102 N MAIN ST)
JT PETROLEUM LLC 11246-46 89.76 7.83%
10908 W MEQUON STREET
MEQUON, WI 53092
(for 101 N MAIN ST)
NATHAN M. GINDT 11246-45 33.00 2.88%
404 CLARK STREET
LODI, WI 53555
(for 108 LODI ST)
11246-44 22.00 1.92%
130 S MAIN ST, W10996 COUNTY ROAD J
LODI, WI 53555
(for 11246-44)
Lot 1, CSM 1176-5S-168 1126-40 110.00 9.60%
130 S MAIN ST
LODI, WI 53555
(for 11246-40)
I, the undersigned, do hereby state that it is my judgment that the properties listed below will benefit from, and will not be damaged by sidewalk, curb & gutter and driveway
construction on Lodi Street (STH 60) from Water Street (STH 60) to Main Street (STH 113) in the City of Lodi, Wisconsin.
Benefited Properties
Lot 2, CSM 1176-5S-168CITY OF LODI (1/2), M&D PROPERTIES LODI LLC
(1/2)
CITY OF LODI
Prt Lot 14, Blk 3, McClouds Add, Comm SE cor Lot 14, Blk 3, McCloud's
Add, Wly on south line 33', Nly to North line, Ely 18', Sly 27', Ely 15', S to
beg
ALL OF LOT 15 & S 39 FT OF LOT 16-BLK 3-MCCLOUD'S 1ST ADD;
Benefited Properties - Page 1 of 3
OWNER FRONTAGE DESCRIPTION PARCEL
NUMBER
FEET OF
FRONTAGE
PERCENT
OF TOTALCLAY INVESTMENTS LLC 11246-39 106.00 9.25%
N1841 RYAN ROAD
LODI, WI 53555
(for 138 LODI ST)
MARTY J. MISKULIN 11246-38 59.00 5.15%
142 LODI ST
LODI, WI 53555
Lodi Street, Southeast Side
RYAN A. AND STEPHANIE L. MAYER 11246-247.02 150.00 13.09%
205 LODI STREET
LODI, WI 53555
139 LODI COMMERCIAL LLC 11246-273 122.00 10.65%
1124 QUINN DRIVE
WAUNAKEE, WI 53597
(for 139 LODI ST)
IT FLOATS LLC Outlot 173, Revised & Consolidated Plat of Lodi 11246-388 43.00 3.75%
N225 FERRY VIEW CIRCLE
LODI, WI 53555
(for 129 LODI ST)
PKA PROPERTIES LLC 11246-387 45.00 3.93%
W11404 HIGH POINT ROAD
LODI, WI 53555
(for 125 LODI ST)
DKM INVESTMENTS LLC 11246-386 29.00 2.53%
W 11308 RED CEDAR DRIVE
LODI, WI 53555
(for 119 LODI ST)
Part of Lots 4-6, Blk 7, Lodi Addition No 1; also part of Outlot 170,
Revised & Consolidated Plat of Lodi
Prt OL62 & OL171, Revised & Consolidated Plat of Lodi, Comm E1/4
cor Sec 27, S89-03-57W 1422.87', S 682.24' to SE r/w Lodi St & POB,
N50-34-12E 25.97', S39-28-56E 39.78', N49-16-08E 4.26', S39-37-56E
65.56', S52-13-42W .83', S39-25-48E 16.78', S50-34-12W 29.67', N39-
25-48W 122' to POB
Lots 4 & 5, also Lots 9 & 10 Exc strip 98' front&rear off W end Lots 9
& 10, Blk 1, Lodi Add #1; ALSO Prt 98' strip off W end Lots 9 & 10, Blk
1, Lodi Add #1 described as, Comm in south boundary Lot 9 85' from
SW cor, Nly 27-1/2' to center of walk, Ely 27' to stone wall, Sly parallel
with Ely line to south boundary Lot 9, Wly along boundary to POB
Lot 10, Blk 3, McClouds Add; Exc 7' off E side thereof
7 FT OFF E SIDE LOT 10-ALL OF LOT 11 & W1/2 OF LOT 12-BLK 3-
MCCLOUD'S 1ST ADD;
Outlot 172, and W 3' of Outlot 171,Revised & Consolidated Plat of Lodi
Benefited Properties - Page 2 of 3
OWNER FRONTAGE DESCRIPTION PARCEL
NUMBER
FEET OF
FRONTAGE
PERCENT
OF TOTALTWO BLACK DOGS LLC Lot 2, CSM 6239-45-91 11246-351.03 78.00 6.81%
N2166 OKEE BAY COURT
LODI, WI 53555
(for 109 LODI ST)
KISMET DEVELOPMENT LLC 11246-352 34.00 2.97%
669 OAK RIDGE ROAD
OREGON, WI 53575
(for 103 LODI ST & 106 S MAIN ST)
SCREWBALL INVESTMENTS LLC 11246-353 109.00 9.51%
207 W MAIN STREET
WAUNAKEE, WI 53597
(for 105 S MAIN ST)
TOTALS 1145.76 100.00%
Outlot 64, Revised & Consolidated Plat of Lodi
Prt Outlot 69, Revised & Consolidated Plat of Lodi, Comm E1/4 cor
Sec 27, S88-46-26W 1576.93', S29-56-56E 574.38', S31-47-23E
62.49' to POB, S29-55-12E 60', N60-04-48E 110', N29-55-12W 60',
S60-04-48W 110' to POB
Christian Reid, P.E.
Benefited Properties - Page 3 of 3
Owner Tax Parcel Parcel
Frontage
Curb &
Gutter
Assessable
Length (ft.)
Corner Lot?
(Y/N)
Long Side?
(Y/N)
Assessable
Curb &
Gutter Cost
($16.82/L.F.)
4" Sidewalk
Assessable
Area (L.F.)
Assessable
4" Sidewalk
Cost
($27.26/L.F.)
6" Sidewalk
Assessable
Area (L.F.)
Assessable 6"
Sidewalk Cost
($22.18/L.F.)
Total
Assessable
Cost
Lodi Street, Northwest Side
ASSOCIATED BANK OF LODI 11246-74 116.00 0 Y N $0.00 0 $0.00 0 $0.00 $0.00
433 MAIN STREET
GREEN BAY, WI 54301
(for 102 N MAIN ST)
JT PETROLEUM LLC 11246-46 89.76 89.76 Y N $1,509.31 39.76 $1,083.88 50 $1,108.75 $3,701.94
10908 W MEQUON STREET
MEQUON, WI 53092
(for 101 N MAIN ST)
NATHAN M. GINDT 11246-45 33.00 33 N $554.89 33 $899.60 0 $0.00 $1,454.49
404 CLARK STREET
LODI, WI 53555
(for 108 LODI ST)
11246-44 22.00 22 N $369.93 0 $0.00 22 $487.85 $857.78
130 S MAIN ST, W10996 COUNTY ROAD J
LODI, WI 53555
(for 11246-44)
130 S MAIN ST 1126-40 110.00 110 N $1,849.65 110 $2,998.66 0 $0.00 $4,848.31
LODI, WI 53555
(for 11246-40)
Final Assessments
2026 Downtown Improvements - Lodi Street
I, the undersigned, do hereby state that it is my judgment that the properties listed below will benefit from, and will not be damaged by sidewalk, curb & gutter and driveway construction on Lodi Street
(STH 60) from Water Street (STH 60) to Main Street (STH 113) in the City of Lodi, Wisconsin.
CITY OF LODI (1/2), M&D PROPERTIES LODI
LLC (1/2)
Owner Tax Parcel Parcel
Frontage
Curb &
Gutter
Assessable
Length (ft.)
Corner Lot?
(Y/N)
Long Side?
(Y/N)
Assessable
Curb &
Gutter Cost
($16.82/L.F.)
4" Sidewalk
Assessable
Area (L.F.)
Assessable
4" Sidewalk
Cost
($27.26/L.F.)
6" Sidewalk
Assessable
Area (L.F.)
Assessable 6"
Sidewalk Cost
($22.18/L.F.)
Total
Assessable
Cost
CLAY INVESTMENTS LLC 11246-39 106.00 106 N $1,782.39 90 $2,453.45 16 $354.80 $4,590.64
N1841 RYAN ROAD
LODI, WI 53555
(for 138 LODI ST)
MARTY J. MISKULIN 11246-38 59.00 34 N $571.71 34 $926.86 0 $0.00 $1,498.57
142 LODI ST
LODI, WI 53555
Lodi Street, Southeast Side
RYAN A. AND STEPHANIE L. MAYER 11246-247.02 150.00 0 Y Y $0.00 0 $0.00 0 $0.00 $0.00
205 LODI STREET
LODI, WI 53555
139 LODI COMMERCIAL LLC 11246-273 122.00 100 Y Y $1,681.50 56.00 $1,526.59 70 $1,551.59 $4,759.68
1124 QUINN DRIVE
WAUNAKEE, WI 53597
(for 139/141. LODI ST)
IT FLOATS LLC 11246-388 43.00 43 N $723.04 43 $1,172.20 0 $0.00 $1,895.25
N225 FERRY VIEW CIRCLE
LODI, WI 53555
(for 129 LODI ST)
PKA PROPERTIES LLC 11246-387 45.00 45 N $756.67 45 $1,226.72 0 $0.00 $1,983.40
W11404 HIGH POINT ROAD
LODI, WI 53555
(for 125 LODI ST)
Owner Tax Parcel Parcel
Frontage
Curb &
Gutter
Assessable
Length (ft.)
Corner Lot?
(Y/N)
Long Side?
(Y/N)
Assessable
Curb &
Gutter Cost
($16.82/L.F.)
4" Sidewalk
Assessable
Area (L.F.)
Assessable
4" Sidewalk
Cost
($27.26/L.F.)
6" Sidewalk
Assessable
Area (L.F.)
Assessable 6"
Sidewalk Cost
($22.18/L.F.)
Total
Assessable
Cost
DKM INVESTMENTS LLC 11246-386 29.00 29 N $487.63 29 $790.56 0 $0.00 $1,278.19
W 11308 RED CEDAR DRIVE
LODI, WI 53555
(for 119 LODI ST)
TWO BLACK DOGS LLC 11246-351.03 78.00 78 N $1,311.57 78 $2,126.32 0 $0.00 $3,437.89
N2166 OKEE BAY COURT
LODI, WI 53555
(for 109 LODI ST)
KISMET DEVELOPMENT LLC 11246-352 34.00 34 Y N $571.71 34 $926.86 0 $0.00 $1,498.57
669 OAK RIDGE ROAD
OREGON, WI 53575
(for 103 LODI ST & 106 S MAIN ST)
SCREWBALL INVESTMENTS LLC 11246-353 109.00 0 Y Y $0.00 0 $0.00 0 $0.00 $0.00
207 W MAIN STREET
WAUNAKEE, WI 53597
(for 105 S MAIN ST)
TOTALS $12,170.00 $16,131.70 $3,502.99 $31,804.69
G:\00\00080\00080103\SPECIAL ASSESSMENTS\00080103 FINAL RESOLUTION.DOC
RESOLUTION 26- 79
FINAL RESOLUTION AUTHORIZING PUBLIC IMPROVEMENT AND
LEVYING SPECIAL ASSESSMENTS AGAINST BENEFITTED PROPERTY
IN THE CITY OF LODI , WISCONSIN (FAIR ST)
WHEREAS, the Common Council of the City of Lodi, Wi sconsin, held a public hearing at the Council
Chambers in the City Hall building at 5 :3 0 p.m. on the 9 th day of September , 202 6 , for the purpose of
hearing all interested persons concerning the preliminary resolution and report of the City Engineer on the
proposed public improvements consisting of reconstructing Fair St , including sanitary sewer, water main,
and storm sewer improvements, 4-inch and 6-inch concrete sidewalk, concrete curb & gutter construction,
parking lot improvements, asphalt trail, and retaining wall construction. P reliminary assessments against
benefited property , and heard all persons who desired to speak at the hearing;
NOW, THEREFORE, BE IT RESOLVED, the Common Council of the City of Lodi, Wisconsin,
determines as follows:
0. The final report of the City Engineer, a copy of which is attached hereto and incorporated
herein as if fully set forth herein, including the plans and specifications and assessments set forth therein,
is adopted and approved.
1. The City Engineer advertised for bids and construction of the improvements were
completed in accordance with the report hereby adopted.
2. Payment for the improvements shall be made by assessing 50% of the total cost of the 4-
inch and 6-inch sidewalk and concrete curb & gutter to the property benefited as indicated in the report .
3. Assessments shown on the report represent an exercise of the police power and have been
determined on a reasonable basis and are hereby confirmed.
4. Assessments for all projects included in the report are hereby combined as a single
assessment but any interested property owner may object to each assessment separately or all assessments
jointly for any purpose.
5. Assessments shall be due within 30 days of billing date. Assessments may be paid in cash
or in four (4) annual installments to the City Clerk. Installments shall be placed on the next tax roll after
the due date for collection and shall bear interest at the rate of 5.0 % per annum on the unpaid balance
from January 1 of the year following the levy .
6. The City Clerk shall publish this resolution as a Class 1 notice under ch. 985, Stats., in
the assessment district and mail a copy of this resolution and a statement of the final assessment against
the benefited property together with notice of installment payment privileges to every property owner
whose name appears on the assessment roll whose post office address is known or can with reasonable
diligence be ascertained.
Dated ______________________ Signed ____________________________________
Thomas Marx , Mayor
Published ___________________
Attest _____________________________________
Arissa Watkins, City Clerk
Source: City of Lodi website. First collected Nov 9, 2026.