6:00 p.m. Regular Meeting of the Plan Commission
Village of Weston · Marathon County · meeting of Nov 9, 2026 · Agendas
Open the original document More from Village of Weston
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Village of Weston, Wisconsin
Meeting of the PLAN COMMISSION
During the 30th legislative session of the elected
Board of Trustees (2026 – 2027)
Monday, November 9, 2026, at 6:00 P.M.
Packet Prepared By: Jennifer H iggins, Director of Planning & Development
Village of Weston, Wisconsin
MEETING NOTICE
Meeting of: PLAN COMMISSION
Commissioners: Lopes-Serrao {c}, Zeyghami {vc}, Cronin, Diesen, Guerndt, Jordan, Mumper
Staff: Jennifer Higgins, Director of Planning & Development
Audrey Webster, Assistant Planner
Date/Time: Monday, November 9, 2026, 6:00 p.m.
Location: Weston Municipal Center (4747 Camp Phillips Road) – Board Room
Agenda: The agenda packet will be sent out at least 3 days prior to the meeting.
Attendance: All Village officials are encouraged to attend. Commissioners, Committee
members, Department Directors, and guests, please indicate if you will, or
will not, be attending so we may determine in advance if there will be a
quorum by sending an RSVP to the assigned Administrative Support
person:
RSVP: Valerie Parker, Plan Commission Secretary
(715) 241-2613
vparker@westonwi.gov
Questions: Jennifer Higgins, Director of Planning & Development
(715) 241-2638
jhiggins@westonwi.gov
This notice was posted at the Municipal Center, 4747 Camp Phillips Road, Weston and was e-
mailed to local media outlets (Print, TV, and Radio) on 11/02/2026.
A quorum of members from other Village governmental bodies (boards, commissions, and committees) may attend the above-noticed meeting in order
to gather information. No actions will be taken by any other board, commission, or committee of the Village, aside from the Village Plan Commission.
Should a quorum of other government bodies be present, this would constitute a meeting pursuant to State ex rel. Badke v. Greendale Village Bd., 173
Wis.2d 553,494 N.W.2d 408 (1993).
Wisconsin State Statutes require all agendas for Committee, Commission, or Board meetings be posted in final form, 24 hours prior to the meeting. Any
posted agenda is subject to change up to 24 hours prior to the date and time of the meeting. All final agendas will be posted on the Village’s website at
www.westonwi.gov and a hard copy posted at the Village Municipal Center.
Any person who has a qualifying disability, as defined by the Americans with Disabilities Act, that requires the meeting or the materials to be in an
accessible location or format, must contact the Weston Clerk’s Department, by 12 noon, the Friday prior to the meeting, so any necessary arrangements
can be made to accommodate each request.
VILLAGE OF WESTON, MARATHON COUNTY, WISCONSIN
REGULAR MEETING AGENDA OF THE PLAN COMMISSION
Weston Municipal Center - Board Room
4747 Camp Phillips Road, Weston, WI 54476
Regular Plan Commission Meeting Agenda, November 9, 2026
Prepared by Jennifer Higgins, Director of Planning and Development
Monday, November 9, 2026, at 6:00 p.m.
Remote Participation & Public Comment Instructions
Members of the Plan Commission, applicants, and members of the public may participate remotely by Zoom or telephone.
Members of the public may provide comments in advance using the Public Comment Form or may participate live as
described below.
Join Zoom Meeting by Computer:
https://zoom.us/j/5445915099
Join Zoom Meeting by Phone:
+1 312 626 6799 US (Chicago)
Meeting ID: 544 591 5099
Public Comment:
Members of the public who wish to speak during the meeting—either during the Public Comment period or a specific hearing—
may do so in one of two ways:
1. Submit a Public Comment Form in advance: Complete the Public Comment form (external web link) and submit it to the
Clerk before the start of the meeting.
2. Participate live via Zoom or telephone: Join the meeting using one of the methods above. Zoom participants may
use the “Raise Hand” feature to be recognized by the Chair. Telephone participants may press *9 to raise their hand.
Please note: The public-comment period is an opportunity to provide information or viewpoints to the Commission; it is not
intended for debate or extended dialogue with commissioners.
1. Call to Order – Roll Call & Declaration of Quorum
• Plan Commission – Lopes-Serrao {C}, Zeyghami {VC}, Cronin, Diesen, Guerndt,
Jordan, Mumper
2. Public comment on Village matters not scheduled for a public hearing on this
agenda.
3. Receive written communications and allow commissioners to disclose potential
conflicts of interest or recusals.
a.
4. Consider approval of the minutes of October 12, 2026, Plan Commission meeting.
5. C
onduct a public hearing and consider action on Project No. 20260386, a request by
Ganster Construction LLC for a Conditional Use Permit to establish a Light Industrial
– Contractor Shop/Contractor Operations use in the B-3 (General Business) District,
within the WHP-A Wellhead Protection Area Zone A Overlay District, at 5900 Mesker
Street.
a. Open the public hearing
b. Receive the staff presentation
c. Receive the applicant presentation
d. Receive public testimony
e. Close the public hearing
VILLAGE OF WESTON, MARATHON COUNTY, WISCONSIN
REGULAR MEETING AGENDA OF THE PLAN COMMISSION
Weston Municipal Center - Board Room
4747 Camp Phillips Road, Weston, WI 54476
Regular Plan Commission Meeting Agenda, November 9, 2026
Prepared by Jennifer Higgins, Director of Planning and Development
f. Discuss whether a refuse and recycling enclosure should be required as a
condition of approval
g. Discuss and consider action on the request
6. Discussion and recommendation to Board regarding Project No. 20260390, a
request to approve the Carter Avenue Condominium Plat, Declaration, and Bylaws,
for 3404 and 3406 Carter Avenue.
7. Discussion and possible direction regarding Conditional Use Permit (CUP) tracking,
ongoing compliance monitoring, and existing and potential revocation provisions,
including insurance-related requirements.
8. Receive the October 2026 report of staff-approved Certified Survey Maps and site
plans.
9. Receive the October 2026 building permit report.
10. Receive 2026 Housing Affordability Report
11. R
eceive the Planning and Development Department monthly project update report.
a. Update on USSAM, 3107 Concord Avenue – CUP No. 20240072
b. Update on Tommy Car Wash, 1611 Schofield Avenue – CUP No. 20191300
c. Update on Mountain Bay Metro PD, 3600 Community Center Drive Site Plan –
Project # 20260116
12. Approve the 2027 Plan Commission Meeting Schedule.
13. Announcements & Commissioner Remarks
a. S
haping Weston’s Tomorrow: Public Comprehensive Plan Workshop –
Thursday, November 12, 2026, 5:00 p.m. – 7:00 p.m.
14. F
uture Agenda Items or Staff Referrals
15. Next Meeting Dates
a. Regular Meeting: Monday, December 14, 2026, at 6:00 p.m.
b. Regular Meeting: Monday, January 11, 2027, at 6:00 p.m.
16. Consider a motion to adjourn.
VILLAGE OF WESTON, MARATHON COUNTY, WISCONSIN
REGULAR MEETING AGENDA OF THE PLAN COMMISSION
Weston Municipal Center - Board Room
4747 Camp Phillips Road, Weston, WI 54476
Regular Plan Commission Meeting Agenda, November 9, 2026
Prepared by Jennifer Higgins, Director of Planning and Development
A quorum of members of another Village board, commission, or committee may attend this meeting to gather information. If a
quorum of another governmental body is present, the gathering may constitute a meeting of that body under State ex rel. Badke v.
Greendale Village Board, 173 Wis. 2d 553, 494 N.W.2d 408 (1993). No action will be taken by any governmental body other than the
Plan Commission.
In accordance with Title II of the Americans with Disabilities Act, the Village of Weston does not discriminate against qualified
individuals with disabilities in its services, programs, or activities. To request assistance or a reasonable accommodation to
participate in this meeting, contact the Village Clerk at 715-359-6114 or clerks@westonwi.gov. Please submit requests at least 72
hours before the meeting. The Village will make a good-faith effort to accommodate requests received less than 72 hours before the
meeting.
This agenda was posted at the Weston Municipal Center and on the Village website and was transmitted to media partners on
November 4, 2026. Questions may be directed to the Planning and Development Department at 715-241-2613 or
plandev@westonwi.gov.
Valerie Parker updated @ 10/14/2026 10:53 AM Page 1 Mtg_BOT_261019_Consent_Minutes_PC261012.docx61012
Village of Weston, Wisconsin
OFFICIAL PROCEEDINGS OF THE VILLAGE PLAN COMMISSION MEETING
held on Monday, October 12, 2026, at 6:00 p.m., in the Board Room, at 4747 Camp Phillips Road
AGENDA ITEMS.
1. Meeting called to order by Plan Commission Vice Chair and Village Trustee Hooshang Zeyghami at 6:12 p.m.
Roll Call of Village Plan Commission (PC) by Secretary Parker. 6:12
Roll call indicated 6 PC members present.
Member Present
Lopes-Serrao, Luis {Chair} EXCUSED
Zeyghami, Hooshang {Vice Chair} YES
Cronin, Steve YES
Diesen, Dave YES
Guerndt, Gary YES - Online
Jordan, Joe YES
Mumper, Roy YES
Village Staff in attendance, in-person: Gebert, Higgins, Wodalski, Hunt, Maguire, Webster, Meverden, and Parker
Village Staff in attendance, via Zoom: None
Other Village Representatives in attendance, in-person: SAFER Fire Marshall, Christiansen
Other Village Representatives in attendance, via Zoom: Village Trustees, Lisa Beck and Katrina Clark
Audience Members in attendance, in-person: There were 5 audience members present, in-person.
Audience Members in attendance, via Zoom: There were 4 audience members present, via Zoom.
2. Public Comment on Village matters not scheduled for a public hearing on this agenda. [0:00:52 Zoom Recording]
Jim Pinsonneault, 5002 Arrow Street, was present and commented on how he feels the Village and the Planning &
Development Department have been reactive versus proactive on projects (referring to Agenda Item #6) . He feels there
are possibly safety concerns if an unfinished project is not ADA compliant and the building potentially being occupied.
Jake Wildeck, 9508 Sandhill Drive, was present online and verified that the Commission received his written comment.
3. Receive written communications and allow commissioners to disclose potential conflicts of interest or recusals.
[0:4:35 Zoom Meeting Recording]
a. Email from Jacob Wildeck regarding USSAM, 3107 Concord Avenue – CUP No. 20240072
It was acknowledged that Wildeck’s submitted email was included in the meeting packet as written comment, regarding
the USSAM property.
4. Consider approval of the minutes from the September 14, 2026, Plan Commission meeting. [0:05:30 Zoom
Recording]
Motion by Diesen, second by Jordan: to approve the September 14, 2026, PC meeting minutes.
Yes Vote: 6 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS
Member (PC) Voting
Lopes-Serrao, Luis {Chair} -----
Zeyghami, Hooshang {Vice Chair} YES
Cronin, Steve YES
Diesen, Dave YES
Valerie Parker updated @ 10/14/2026 10:53 AM Page 2 Mtg_BOT_261019_Consent_Minutes_PC261012.docx61012
5. Conduct a public hearing and consider action on Project No. 20260333, a request by U.S. Venture, Inc., for a
Conditional Use permit to operate a freight terminal and mass transportation depot in the LI (Limited Industrial)
District and to approve the motor freight terminal use within the WHP-A (Wellhead Protection Area) Overlay District,
at 6002 Saxon Avenue [0:05:52 Zoom Meeting Recording]
a. Open the public hearing
Zeyghami opened the public hearing at 6:19 p.m.
b. Receive the staff presentation
Higgins explained the applicant is requesting a Conditional Use Permit (CUP) to operate a freight terminal and mass
transportation depot in the LI Zoning District, and Wellhead Protection (WHP-A) Overlay District. She stated that per the
zoning code, this use type requires a CUP in the LI Zoning District and in the WHP-A Overlay District, a freight terminal
also requires a CUP. She stated that staff has been working with them to get the necessary documents and
environmental assessment from their engineering firm. She stated we just received the environmental assessment
today, where staff has not had a chance to fully review it yet, but initial review by Wodalski is showing no issues with
this proposed use here. She stated this document is listed as a condition in the approval.
She then summarized her report that is within the meeting packet, pointing out the suggested 14 conditions within the
draft Conditional Use Permit report.
Mumper questioned this being a non-paved site, and how when looking on Google maps, he could see a previous
business tracking dirt and gravel out onto the roadway. Higgins stated since this is an existing site, they are not required
to pave the site. If they were redoing the parking lot, we would make them come into conformance.
c. Receive the applicant presentation
James Fenlon with US Venture and US Auto Force, 222 W College Avenue, Appleton, stated how they currently operate a
similar facility in Rib Mountain and are now relocating their facility here. He stated they have 7 employees, and about 9
months out of the year, two 53-foot semis bring in tire products into the site, that are then transloaded to 7 different
delivery vehicles that then deliver product to retailers across northwest Wisconsin. He stated they have been a tire
distributor for 50 years.
Mumper questioned if there is any kind of preventative measure they would take in preventing tracking dirt or gravel
on to road. Fenlon answered that they are a family-owned company, headquartered in Appleton, and they are very
cognizant of the communities they operate in, and if it were to be an issue after they open and are operating, they
would work with staff on a reasonable solution.
It was clarified that Saxon Avenue was just repaved in 2025.
d. Receive public testimony
Brian Pendleton, 5305 Fuller Street, was present with questions. He stated how when Fuller Street was reconstructed
last year, how a path was placed in front of his house and how there are e-bikes and e-scooters that travel fast
(appearing to not pay attention to driveways and intersections) past his house throughout the day. He is concerned
that one of these riders is going to get hit, or hit somebody, as they are not paying attention. He asked what time the
Guerndt, Gary YES
Jordan, Joe YES
Mumper, Roy YES
Valerie Parker updated @ 10/14/2026 10:53 AM Page 3 Mtg_BOT_261019_Consent_Minutes_PC261012.docx61012
delivery vehicles are operating in and out of there for public safety reasons and for noise concern reasons, as he goes to
bed at 7pm and wakes up at 3am. He is concerned about the disturbance in his sleep. He also asked what all they will
be delivering (antifreeze, oils, car parts)? How will issues be taken care of if there is any leakage, as this is within the
wellhead.
It was discussed as far as traffic, currently there are only two businesses along Saxon, which are D&L Signs and
Badgerland Dairy Distributor.
Pinsonneault spoke in support of this project. He stated he purchases tires from this distributor and he feels it is a good
fit for this area. He explained how the smaller delivery trucks deliver the tire order to his business and other local
automotive repair businesses.
Fenlon stated that their inbound transfer semis arrive around 1am, with outbound delivery vehicles departing during the
early morning hours, after the retail locations are open and can receive the delivery (around 7am). He stated that if the
delivery truck has to travel further, then they may start earlier, such as 6am.
Fenlon stated that 99.9% of what they distribute are tires, however; they do deliver some tire-related parts (valve stems,
tubes, etc.).
e. Close the public hearing
Zeyghami closed the hearing at 6:34 p.m.
f. Discuss and consider action on the request
Higgins confirmed to Cronin that there is no long-term storage of tires here. Essentially, tires are trucked in, sorted, and
then distributed out. She stated how they will not be utilizing the docks here. The building will primarily be for
restrooms for employees, storage of things like handcarts needed to move items around, etc.
Cronin questioned Condition #6 which states “No more than one inbound transfer trailer may remain onsite at any one
time. No tractors may remain parked onsite after the trailer is dropped.”, asking what the purpose of that condition is,
and stated that he would like to remove that condition.
Guerndt commented on if truck traffic is muddying up road from that site, as far as potentially impacting the storm
sewer, as the storm sewer is down the hill from this site. Wodalski verified that stormwater will run from that site
directly to the storm sewer, and how it flows directly into the floodplain. Wodalski stated if this is an issue, we could
require a tracking pad be installed. Guerndt questioned Fenlon if they would be willing to add a tracking pad. Fenlon
stated he would work with staff to take care of that if it becomes an issue.
Higgins pointed out the draft Determination, stating how PC can use the suggestions by staff or they can provide their
own responses.
PC then went through and answered the Determination as follows:
1. Yes
2. Yes (no adverse impact)
3. Yes
4. Yes
5. Yes
Higgins explained the four PC action options that staff has provided, and clarifying that staff is recommending Option #1,
subject to completion of the WHP-A review by Wodalski. She stated PC can remove or add any conditions. She stated
Valerie Parker updated @ 10/14/2026 10:53 AM Page 4 Mtg_BOT_261019_Consent_Minutes_PC261012.docx61012
that staff would like to be able to work with the applicant to get that assessment document, which will get recorded
with the CUP.
Motion by Guerndt, to approve Project No. 20260333, per Action Option #1, also adding in there to work with the
Village on the storm water and debris/solids that would be tracked out on to the road. There was no second, so the
motion failed.
Motion by Cronin, second by Jordan, to approve Project No. 20260333, as is, with the proposed addition of striking out
condition #D. Diesen questioned adding the language about tracking debris/gravel onto the road.
Motion by Mumper, second by Diesen, to amend the motion to include a condition of the applicant working with
Wodalski on a solution for any tracking of dirt/gravel on to the roadway.
Motion on the amendment – all ayes.
Motion on original motion – all ayes.
Motion by Cronin, second by Jordan, to approve Project No. 20260333, in accordance with Action Option No. 1 and
based on the findings contained in the Determination, subject to the conditions outlined in the staff report, with
Condition No. 6 removed and an additional condition requiring the applicant to work with the Village Engineer to
implement an appropriate solution if dirt, gravel, debris, or other material from the site is tracked onto Saxon Avenue.
Motion as amended passed unanimously.
Yes Vote: 6 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS
6. Conduct a public hearing and consider action on Project No. 20230129, a request by BUG Properties, LLC, to
amend Conditional Use Permit No, 20230129, by extending the deadline for completion of required site
improvements at 6406 Schofield Avenue [0:39:28 Zoom Meeting Recording]
a. Open the public hearing
Zeyghami opened the public hearing at 6:52 p.m.
b. Receive the staff presentation
Higgins summarized her staff report and how Bruce Guss, of BUG Properties, has now requested an extension to
complete the site by September 30, 2027.
Maguire went through in more detail on the items that need to be completed yet, as noted in the staff report, which
followed meetings and phone call discussions that took place with Guss.
Member (PC) Voting
Lopes-Serrao, Luis {Chair} -----
Zeyghami, Hooshang {Vice Chair} YES
Cronin, Steve YES
Diesen, Dave YES
Guerndt, Gary YES
Jordan, Joe YES
Mumper, Roy YES
Valerie Parker updated @ 10/14/2026 10:53 AM Page 5 Mtg_BOT_261019_Consent_Minutes_PC261012.docx61012
Guerndt explained how this overall project had become much larger than what was originally anticipated, and how Guss
has stuck way more money into it than he thought he would. He is just asking for an extension so that he can come up
with more funding to finish this.
Part of his reasoning for not pouring concrete yet, is that he is in the process of purchasing the adjacent Auto Select
building.
c. Receive the applicant presentation
None
d. Receive public testimony
Pinsonneault commented on how the project so far is looking great, but how the project expired last year and
questioned just how much longer the Village will let this go.
e. Close the public hearing
Zeyghami closed the hearing at 7:03 p.m.
f. Discuss and consider action on the request
Diesen stated he does not support giving the applicant an extension. He stated how it appears the applicant has ignored
our messages and has not showed any interest in keeping the project moving forward and now wants another year. He
feels it is time for the Village to enforce the issue to move the project along.
Jordan questioned the progress and remaining issues. Maguire stated how the electrical corrections have been
completed, and how most everything remaining with the building is accessibility. He stated there is still questions on
the HVAC which is tied to the occupancy. He stated as far as plumbing that has to do with a private well that is on the
property which has an expired permit (from 2019).
Maguire stated the office is not currently being used. He stated there is stuff inside building which has not been being
used. He stated that from what he can tell, anyone he has seen there has been outside of the structure.
Maguire commented on how entire project is way over budget (versus the insurance payout). Jordan asked if we
removed the requirement of concrete, leaving work to handicap accessibility, how that should be completed well within
a year. Maguire pointed out the extensive areas of missing concrete.
Jordan stated that he would be inclined to remove some of the concrete requirements to make this a shorter period of
time for Guss to be able to get into compliance with the mechanical issues.
Bruce Guss joined the meeting, via Zoom, at 7:13pm. He did not speak as the public comment portion of the agenda
was already over.
Cronin commented that if we reduced the concrete requirement how we would be setting a precedent for future
projects. Cronin stated how it is not the PC or staff’s responsibility to babysit the project and the owner, and how we do
not have time to constantly check in to see where the owner is at.
Higgins stated Exhibit B, in the packet, is the original approved site plan, and how PC had already given some
concessions on that approval. She stated there is a cross-access easement with Clearview for the driveway and parking
area.
Cronin suggested we offer a staggered deadline, where everything but the concrete is completed by a certain date and
give a longer extension on the concrete.
Valerie Parker updated @ 10/14/2026 10:53 AM Page 6 Mtg_BOT_261019_Consent_Minutes_PC261012.docx61012
Maguire stated if Guss gets everything lined, most of the items could be done within 1 month.
Cronin stated we could give Guss until the end of year to complete other outstanding items.
Mumper was concerned about the deadline, as far as the upcoming holidays which may make things difficult for both
the applicant and staff.
Higgins explained again the amendment is for a completion extension, and how staff just needs some direction, as
currently Guss is not in compliance. She stated either we need to pull his approvals and go through the whole hearing
process to revoke his CUP (with the assistance/direction of our attorney) or offer an extension.
The PC went through the Determination:
1. Yes
2. Yes
3. Yes
4. Yes
5. Yes
Motion by Cronin, second by Mumper, to recommend approving the amendment to the Conditional Use Permit No.
20230129, for BUG Properties, LLC, extending the deadline to complete the remaining approved site improvements, at
6406 Schofield Avenue, to November 30, 2026, for all items excluding the concrete, and extending the deadline
September 30, 2027 to complete the concrete, based on the findings contained in the Determination, and subject to
the 7 conditions outlined in the report, with all other terms and conditions of the Conditinal Use Permit No. 20230129,
the Development Agreement, and the approved site plan remaining in full force and effect. Diesen voted nay.
Yes Vote: 5 No Votes: 1 Abstain: 0 Not Voting: 1 Result: PASS
7. Review and consider action on Project No. 20260308, a Special Exception Sign Permit request for Turf MDs at 5605
Mesker Street [1:20:57 Zoom Meeting Recording]
Webster summarized her report in the packet. She clarified that this 20-foot-tall sign was put in back in 1996, when
there was only a 5-foot setback. Now the setback is equal to the height of the sign.
She explained that because they are placing a new sign cabinet, they are required to meet the code or request the
special exception, and that the sign post is 15 feet short of the setback.
Higgins stated if they would have used the existing curved sign cabinet, then they would not need to go through this
process, but since they switched it out, they are now required to meet current sign code regulations.
Motion by Mumper, second by Guerndt, to recommend approval of Project No. 20260308.
Member (PC) Voting
Lopes-Serrao, Luis {Chair} -----
Zeyghami, Hooshang {Vice Chair} YES
Cronin, Steve YES
Diesen, Dave NO
Guerndt, Gary YES
Jordan, Joe YES
Mumper, Roy YES
Valerie Parker updated @ 10/14/2026 10:53 AM Page 7 Mtg_BOT_261019_Consent_Minutes_PC261012.docx61012
Yes Vote: 6 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS
8. Receive an informational report regarding proposed modifications to the approved site plan for the Mountain Bay
Metro Police Department, Project No. 20260116, at 3600 Community Center Drive. No action will be taken. [1:25:00
Zoom Meeting Recording]
Higgins summarized her staff report, stating following the recent ground-breaking ceremony, it was found that the gas
line easement and the physical location of the gas line do not match. Proposed site plan modifications were just shared
with Village staff, so we were not able to do a full review quite yet. She stated that staff does not initially see any issues
with the proposed changes. She stated that staff is asking PC and BOT for their support of a conditional authorization
for an early start permit to allow for the construction of the footings and foundation. She stated when the final
amended site plan is fully reviewed, staff will share with PC and BOT in November for formal approval.
Hunt commented their contractor, 8-Pine is here. He stated that since gas line did not line up with easement, they now
are working with TC Energy to get things cleared up and for the easement to get re-written. He stated the building is the
same just moved over. He stated the parking is primary what changed.
There was discussion on the actual pipeline location and whether there could be any financial compensation by TC
Energy for the additional work that will be needed in planning, etc.
Motion by Cronin, second by Guerndt: to acknowledge the potential amendments to the previously approved site
plan for the Mountain Bay Metro Police Department and Municipal Court facility, at 3600 Community Center Drive;
direct staff to continue technical review and coordination; and recommend to the Board of Trustees that staff be
authorized to issue an early-start permit limited to footings and foundation, only after staff verifies that the proposed
building location meets all applicable setback requirements and confirms that all other applicable Code, plan,
submittal, and approval requirements have been satisfied, with setback verification, anticipated shortly after the Plan
Commission meeting, and if possible, before the October 19, 2026 Board meeting, and with the final amended Site
Plan package returning to the Plan Commission and Board of Trustees for formal approval in November 2026.
Yes Vote: 6 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS
9. Receive September 2026 report of staff-approved
Certified Survey Maps and Site Plans.
10. Receive the September 2026 building permit report
[1:37:33 Zoom Meeting Recording]
Motion by Cronin, second by Mumper: to acknowledge agenda Items #9. & 10
Member (PC) Voting
Lopes-Serrao, Luis {Chair} -----
Zeyghami, Hooshang {Vice Chair} YES
Cronin, Steve YES
Diesen, Dave YES
Guerndt, Gary YES
Jordan, Joe YES
Mumper, Roy YES
Member (PC) Voting
Lopes-Serrao, Luis {Chair} -----
Zeyghami, Hooshang {Vice Chair} YES
Cronin, Steve YES
Diesen, Dave YES
Guerndt, Gary YES
Jordan, Joe YES
Mumper, Roy YES
Valerie Parker updated @ 10/14/2026 10:53 AM Page 8 Mtg_BOT_261019_Consent_Minutes_PC261012.docx61012
Yes Vote: 6 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS
11. Receive the Planning & Development Department monthly project update report. [1:38:00 Zoom Meeting
Recording]
Higgins referred to her monthly report in the packet.
a. Update on USSAM, 3107 Concord Avenue – CUP No. 20240072
Higgins stated that USSAM has hired a surveyor and staff hopes to have something for the Commission next month to
review.
b. Update on Tommy Car Wash, 1611 Schofield Avenue – CUP No. 20191300
Wodalski stated that they submitted a copy of their video (film) tank inspection; however, the tank was still partially
filled during the filming so a request has been made for a new film to be taken once the tank is empty. Wodalski is
anticipating receiving this next month. It was also explained they are still working with Tommy Car Wash corporate to
obtain the certificate of insurance.
Higgins stated she now has a local contact that she is working with, who has to work with their corporate headquarters
on this.
Mumper commented on insurance lapse, and how anytime this is within 30 days of occurring, the Village should be
notified. He stated that anytime we get notified that insurance is going to lapse, it needs to be brought to Committee
the next month where we can discuss revoking the operating permit. The members agreed that with this being in the
Wellhead, the Village should receive a 30-day notice of insurance cancellation.
12. Announcements & Commissioner Remarks [1:44:57 Zoom Recording]
Diesen stated that he needs to be excused from the November 12
th event. Guerndt has to be excused also. It was
pointed out that this is just an open house event for the public.
13. Future Agenda Items or Staff Referrals [1:45:29 Zoom Recording]
Cronin brought up about the determination that we go through during the CUP hearings and if they are necessary, as
they are redundant. Higgins explained the Commission is required to provide written findings and these questions in
the determination come right from the zoning code on what needs to be met prior to issuance of the CUP.
Mumper stated that it should be clear on that future agenda item that there should be an automatic provision for
termination of a conditional use permit if the certificate of insurance has expired, particularly within the wellhead. He
would like to see this as a discussion item on a future agenda.
14. Next Meeting Dates
Member (PC) Voting
Lopes-Serrao, Luis {Chair} -----
Zeyghami, Hooshang {Vice Chair} YES
Cronin, Steve YES
Diesen, Dave YES
Guerndt, Gary YES
Jordan, Joe YES
Mumper, Roy YES
Valerie Parker updated @ 10/14/2026 10:53 AM Page 9 Mtg_BOT_261019_Consent_Minutes_PC261012.docx61012
a. Regular Meeting: Monday, November 9, 2026, at 6:00 p.m.
b. Regular Meeting: Monday, December 14, 2026, at 6:00 p.m.
15. Consider a motion to adjourn
Motion by Diesen, second by Mumper: to adjourn at 8:05 p.m.
Hooshang Zeyghami, Village Trustee and Plan Commission Vice Chair
Jennifer Higgins, Director of Planning & Development
Valerie Parker, Recording Secretary
REQUEST FOR CONSIDERATION
VILLAGE OF WESTON
4747 CAMP PHILLIPS ROAD
Public Mtg/Date: Plan Commission, November 9, 2026
Description: Conduct a public hearing and consider action on Project No. 20260386, a
request by Ganster Construction LLC for a Conditional Use Permit to
establish a Light Industrial – Contractor Shop/Contractor Operations use in
the B-3 (General Business) District, within the WHP-A Wellhead Protection
Area Zone A Overlay District, at 5900 Mesker Street.
From: Jennifer Higgins, Planning & Development Director/Zoning Administrator
Question: Should the Plan Commission approve Conditional Use Permit No. 20260386
for Ganster Construction LLC to establish a Light Industrial – Contractor
Shop/Contractor Operations use at 5900 Mesker Street? If so, should a
refuse and recycling enclosure be required?
BACKGROUND
Ganster Construction LLC, represented by Cody Ganster, is requesting a Conditional Use Permit to
occupy the existing building of approximately 15,000 square feet at 5900 Mesker Street (Parcel 192-
2808-164-0135; 1.01 acres) for a contractor operation. The C ounty parcel record lists Lab Income
Trust and related Larry A. Busse trust/individual interests as the property owner. The property is
zoned B-3 General Business, is within the WHP-A Wellhead Protection Area Zone A Overlay District,
and is designated Mixed or Flex Commercial/Industrial on the Future Land Use Map. Staff classifies
the use as Light Industrial under §94.4.08(1), which is a conditional use in the B -
3 district under
Figure 94.3.05. No residentially zoned property is adjacent to the site.
The building would serve as the employee reporting and dispatch point and provide indoor storage
for company trucks, trailers, construction equipment, tools, and materials, with accessory office and
billing activity. The applicant has about 13 employees and receives package deliveries about twice a
week. No retail sales, customer area, outdoor contractor yard, or outdoor material storage is
proposed, and there will be no changes to the building footprint or parking lot. The existing lot has 17
spaces plus 1
accessible stall, for a total of 18 spaces (19 if the south stall nearest the street is
usable), which exceeds the 13-space minimum. Staff recommends limiting routine operations to 5:00
a.m. to 10:00 p.m., keeping heavy vehicles, trailers, equipment, and materials indoors, and prohibiting
onsite fueling and unapproved storage of fuel, chemicals, or other regulated substances within the
WHP-A overlay.
The principal site issue is refuse and recycling storage. The property does not have a refuse and
recycling enclosure and has never had one. Dumpsters are placed on a concrete pad in the front
parking lot at the southeast corner of the building, which is t he same location the previous business
used. On November 3, 2026, SAFER Fire Marshal Martin Christiansen confirmed that SAFER has
no concerns with this location because the building is concrete and metal with no overhang. Exterior
containers remain subject
to §94.12.06(2) and Municipal Code §66.115, so the Plan Commission
must decide under Condition 9 whether an enclosure is required. If an enclosure is required, the
applicant would need to submit an enclosure site plan, meet accessory structure setbacks, keep the
enclosure at least 10 feet from buildings, and obtain the refuse hauler's sign-off on the location.
REQUEST FOR CONSIDERATION
VILLAGE OF WESTON
4747 CAMP PHILLIPS ROAD
A separate sign permit application has been filed, and the CUP does not approve any signage. Before
the use begins, the applicant must obtain a certificate of occupancy and complete the occupancy
inspection with SAFER Fire Department and the Building Inspector. Notice of the public hearing was
published on October 26 and November 2, 2026, and mailed to property owners within 300 feet. Staff
finds that the §94.16.06(8) CUP criteria are satisfied, subject to the recommended conditions.
Attached Docs: Public Hearing Notice; Notice of Public Hearing; Zoning Map; Staff Analysis;
Draft Conditional Use Permit #20260386 with Exhibit A – Site Plan, Exhibit B
– Approved Operational Description, Exhibit C – Commercial Refuse and
Recycling Plan, Exhibit D – Plan Commission Written Determination, and
Exhibit E – Certified Plan Commission Action/Minutes Excerpt; Conditional
Use Permit Determination
Committee Action: Pending. The Plan Commission will hold the public hearing and take action
on November 9, 2026.
Fiscal Impact: None. The request reuses an existing developed site that is already served
by streets and utilities, and no public improvements are proposed.
Recommendation: Staff recommends approval of Conditional Use Permit No. 20260386 for
Ganster Construction LLC at 5900 Mesker Street, based on the findings in
the staff analysis and subject to the recommended conditions of approval.
The Plan Commission must also choose a refuse and recycling option under
Condition 9.
RECOMMENDED LANGUAGE FOR OFFICIAL ACTION
Move to approve Conditional Use Permit No. 20260386 for Ganster Construction LLC to establish a
Light Industrial contractor shop/contractor operations use at 5900 Mesker Street, based on the
findings contained in the staff analysis and subject to the recommended conditions of approval, with
refuse and recycling Option [(a)/(b)/(c)] selected under Condition 9, and with authorization for the
Zoning Administrator to make non-substantive corrections and finalize the recorded Conditional Use
Permit document.
ADDITIONAL ACTION: Choose a refuse and recycling option under Condition 9: (a) leave the
dumpsters in their current location without an enclosure; (b) require an
enclosure and set a completion timeframe; or (c) store containers inside
except on collection day. After approval, the Chair and Zoning Administrator
will sign the CUP for recording.
PUBLIC HEARING NOTICE - CONDITIONAL USE PERMIT
Property Address: 5900 Mesker Street, Weston, WI 54476
Applicant: Ganster Construction LLC, represented by Cody Ganster
Property Owners Listed in County Parcel Record: Lab Income Trust (U/A 8-22-2013); Busse,
Larry A (individually); Larry A Busse Revocable Trust (U/A 1-26-1995); Busse, Larry A (TTEE)
Tax Parcel ID: 192 2808 164 0135
Project Number: 20260386
Legal Description (abbreviated county parcel description): WESTON COMMERCIAL PARK PT
OF LOT 5 BLK 2 - LOT 1 CSM #10355 / V42 P178 / DOC #1144885. Located in the SW¼ of the SE¼
of Section 16, Township 28 North, Range 8 East, Village of Weston, Marathon County, Wisconsin.
County Record Caveat: The county parcel record flags description errors in Documents #1919224
and #1919233 requiring correction and directs readers to the recorded document for a complete legal
description.
The Village of Weston Plan Commission will hold a public hearing to consider a request from Ganster
Construction LLC for a Conditional Use Permit to allow Light Industrial – Contractor
Shop/Contractor Operations for the property located at 5900 Mesker Street.
The property is zoned B-3 (General Business) and is located within the WHP-A (Wellhead
Protection Area Zone A) Overlay District. The property is 1.01 acres and is identified as PIN 192
2808 1640135.
The proposed use is a Light Industrial – Contractor Shop/Contractor Operations use that
includes indoor storage of company trucks, trailers, and equipment; accessory administrative and
billing office space; and employee parking.
The Conditional Use Permit is required because the proposed Light Industrial – Contractor
Shop/Contractor Operations use requires conditional use approval in the B-3 (General Business)
zoning district. The property is also located within the Village’s Wellhead Protection Area Zone A.
The Village will review the proposed activities to determine whether additional approvals or
environmental documentation are required under the applicable Wellhead Protection regulations.
PUBLIC HEARING INFORMATION
Date: Monday, November 9, 2026
Time: 6:00 p.m.
Location: Weston Municipal Center Board Room
4747 Camp Phillips Road, Weston, WI
The purpose of the public hearing is to receive comments from interested residents and property
owners regarding the proposed Light Industrial – Contractor Shop/Contractor Operations before
the Plan Commission considers action on the request.
REVIEW PROJECT MATERIALS
Additional information regarding this application may be obtained from the Village of Weston Planning
& Development Department at 4747 Camp Phillips Road, Weston, Wisconsin, during regular
business hours.
Application materials, site plans, and supporting documents are also available for review in person at
the Planning & Development Department during normal business hours (Monday through Friday, 8:00
a.m. to 4:30 p.m.).
SUBMIT COMMENTS
Residents who wish to provide comments may attend the public hearing or submit written comments
to the Planning & Development Department prior to the meeting. Written comments to be included in
the meeting packet should be submitted no later than noon on Wednesday, November 4, 2026.
Written comments received after the packet deadline and before the hearing will be provided to the
Plan Commission for consideration at the meeting.
For additional information, please contact the Village of Weston Planning & Development Department
at (715) 241-2613 or plandev@westonwi.gov.
NOTICE TO ADJACENT PROPERTY OWNERS AND MUNICIPALITIES
In accordance with Wis. Stat. § 62.23(7)(d)2 and Weston Zoning Ordinance Chapter 94, notice of this
public hearing will be mailed to property owners within 300 feet of the affected parcel and to any
adjacent municipality within 1,000 feet.
VILLAGE OF WESTON
NOTICE OF PUBLIC HEARING
The Village of Weston Plan Commission will hold a public hearing on Monday, November 9, 2026, at
6:00 p.m., at the Weston Municipal Center, Board Room, 4747 Camp Phillips Road, Weston,
Wisconsin, to consider the following request:
Project Number 20260386: Ganster Construction LLC, represented by Cody Ganster, requests a
Conditional Use Permit for a Light Industrial – Contractor Shop/Contractor Operations use at
5900 Mesker Street, parcel 192-2808-164-0135. The proposal includes indoor storage of company
trucks, trailers, and equipment; accessory administrative and billing office space; and employee
parking. Ownership listing: Lab Income Trust (U/A 8-22-2013); Busse, Larry A (individually); Larry A
Busse Revocable Trust (U/A 1-26-1995); Busse, Larry A (TTEE). The property is zoned B-3 General
Business and lies within Wellhead Protection Area Zone A, where additional approvals or
environmental documentation may be required.
Interested persons may attend and be heard or submit written comments to the Village of Weston
Planning & Development Department before the hearing. Application information is available from the
department at 4747 Camp Phillips Road during regular business hours.
Dated this 22
nd day of October, 2026.
Valerie Parker, Commission Clerk
Run: October 26, 2026 and November 2, 2026.
Village of Weston | Planning & Development
Ganster Construction CUP No. 20260386 | 1
VILLAGE OF WESTON | PLANNING & DEVELOPMENT
STAFF ANALYSIS
Conditional Use Permit No. 20260386
Ganster Construction LLC | 5900 Mesker Street
Item Project Information
Applicant Ganster Construction LLC
Property address 5900 Mesker Street, Weston, WI 54476
Parcel number 192-2808-164-0135
Property owner County parcel record lists Lab Income Trust and related Larry A. Busse trust/individual interests
Zoning B-3 General Business District
Overlay WHP-A Wellhead Protection Area Zone A
Future Land Use Mixed or Flex Commercial/Industrial
Requested use Light Industrial, consisting of contractor shop/contractor operations
Hearing date November 9, 2026
Executive Summary
Ganster Construction LLC requests a Conditional Use Permit to occupy an existing approximately 15,000-square-
foot building for a contractor operation. The property would function primarily as an employee reporting and
dispatch point and as indoor storage for company trucks, trailers, construction equipment, tools, and materials.
Accessory office and billing activity would occur in the building. The applicant identifies approximately 13 employees
and occasional package deliveries.
Staff classifies the proposed use as Light Industrial under §94.4.08(1). Figure 94.3.05 identifies Light Industrial as a
conditional use in the B-3 General Business District. The proposal can satisfy the Conditional Use Permit criteria if
the operation remains substantially as represented, heavier trucks, trailers, equipment, tools, and construction
materials remain indoors, and the applicant completes the occupancy requirements. The property is an existing
developed site, and no changes to the building footprint or existing parking lot are proposed.
Staff recommendation: Approve CUP No. 20260386 subject to the conditions in Section 10 of this analysis. The
principal site issue is refuse and recycling storage. There is no refuse and recycling enclosure on the property, and
there has never been one at this location. Dumpsters are currently placed on a concrete pad in the parking lot in
front of the building, at the southeast corner, per the submitted site plan. On November 3, 2026, SAFER Fire Marshal
Martin Christiansen confirmed that SAFER has no concerns with this location because the building is concrete and
metal with no overhang. The remaining question is for the Plan Commission to determine whether an enclosure
should be constructed.
1. Request and Existing Conditions
The subject property is an existing developed commercial/industrial site at 5900 Mesker Street. The parcel is zoned
B-3 General Business District and lies within the WHP-A Wellhead Protection Area Zone A Overlay District. The
Comprehensive Plan Future Land Use designation is Mixed or Flex Commercial/Industrial. No residentially zon
ed
p
roperty is directly adjacent to the site.
The application does not propose a new building, a site expansion, or changes to the existing parking lot. The
principal land-use question is whether the proposed contractor operation is appropriate within the existing building
Village of Weston | Planning & Development
Ganster Construction CUP No. 20260386 | 2
and site, and what conditions are necessary to ensure the use remains compatible with the B-3 district, nearby
properties, the Wellhead Protection Overlay, and the Comprehensive Plan.
2. Proposed Operation
• Employees report to the property, transfer to company vehicles, leave for off-site construction work, and return
company vehicles at the end of the workday.
• The building is used for indoor storage of company vehicles, trailers, construction equipment, tools, and
materials, together with accessory office and billing functions.
• The operational plan identifies approximately 13 employees and package deliveries approximately twice per
week.
• No retail sales, customer seating area, outdoor contractor yard, or outdoor construction-material storage is
proposed.
• Licensed employee vehicles and company passenger cars or pickup trucks may remain outdoors in approved
parking spaces. Heavy-duty service trucks, straight trucks, utility trailers, construction equipment, tools, and
materials should remain inside except during active loading or unloading.
• The operational plan does not establish fixed hours. Staff recommends reasonable operating limits while
preserving occasional emergency or weather-response activity.
3. Land Use Classification and District Allowance
Section 94.4.08(1) defines Light Industrial to include industrial facilities, manufacturing operations, and contractor
shops where operations are conducted entirely within an enclosed building, except for fully screened outdoor
storage and loading operations. Light Industrial facilities may not create nuisance conditions such as odor, noise,
heat, vibration, or radiation detectable at the property line and may not pose a significant safety hazard.
Under Figure 94.3.05, Light Industrial is a conditional use in the B-3 General Business District. The proposed
contractor storage and dispatch operation therefore may be approved at this location only through the Conditional
Use Permit process. The use is not being reviewed as a general office or warehousing use because those activities
are accessory to the principal contractor operation.
Staff finds the Light Industrial classification appropriate. The principal compatibility factor is that the operational
activity, heavy vehicles, trailers, equipment, tools, and construction materials will be contained within the building,
while outdoor activity will be limited to parking of employee vehicles and company passenger cars or pickup trucks
and short-duration loading or unloading.
4. Zoning Code Compliance Matrix
Topic Code Standard Status Staff Finding / Action
Use allowance §94.3.05;
§94.4.08(1)
Light Industrial is conditional in B-3;
contractor shops must comply with the
Light Industrial standards.
Meets with CUP Approve only the submitted indoor contractor
storage/dispatch use.
Enclosed operations §94.4.08(1) Operations must occur inside, except
screened outdoor storage and loading.
Meets with
condition
Heavy trucks, trailers, equipment, tools, and
materials remain indoors. Cars and pickup
trucks may use approved outdoor spaces.
Nuisance standards §94.4.08(1); Art. 12
No odor, noise, heat, vibration, radiation,
glare, dust, or similar nuisance at the
property line.
Meets with
condition
Limit idling and prohibit outdoor repair,
fabrication, washing, or similar operational
activity.
Loading/front yard §94.4.08(1)(3);
§94.12.10
No loading, unloading, or storage in the
minimum required front yard.
Meets with
condition
Loading occurs inside the building or in
existing on-site areas outside the minimum
required front yard.
Parking quantity §94.4.08(1)(8) One space for each employee on the largest
work shift.
Meets (13
required; 18–19
existing)
Existing lot has 17 spaces plus 1 accessible
(handicapped) stall, for 18 total, or 19 if the
south stall nearest the street is usable. Staff
Village of Weston | Planning & Development
Ganster Construction CUP No. 20260386 | 3
Topic Code Standard Status Staff Finding / Action
will determine this at final occupancy
inspection. The 18 spaces exceed the 13-
space minimum and leave room for outdoor
company car/pickup parking.
Parking/circulation §94.12.09
Parking and traffic areas must meet
dimensional, access, surfacing, drainage,
curb/gutter, lighting, and circulation
standards.
Existing; no
changes proposed
Existing parking lot, stalls, access, and
circulation remain unchanged. No new site
plan is required.
Landscaping/buffering §94.11.02;
§94.4.08(1)(4)
General landscaping applies; Light
Industrial bufferyard applies where abutting
residential zoning.
No residential
buffer triggered
No residentially zoned parcel is adjacent.
Maintain other applicable landscaping.
Refuse/recycling §94.12.06(2); Ch.
66, §66.115
Exterior containers require a compliant
enclosure.
Plan Commission
determination
No enclosure exists or has ever existed on
site. Dumpsters are placed on a concrete pad
in the front parking lot at the southeast corner
of the building per the site plan. SAFER Fire
Marshal confirmed 11/3/26 that SAFER has no
concerns with this location (concrete and
metal building, no overhang). Plan
Commission to determine whether an
enclosure must be constructed. With an
enclosure: site plan required, accessory
structure setbacks, 10 ft from buildings, and
hauler sign-off on location.
Exterior lighting §94.12.11;
§94.12.09
Lighting must be shielded, avoid spillover,
and safely serve parking/circulation areas.
Verify at
inspection/plan
review
Existing or proposed fixtures must meet code;
new fixtures require staff review.
Wellhead protection WHP-A overlay
requirements
Activities must not create an unacceptable
groundwater-contamination risk.
Meets with
conditions
No onsite fueling or unapproved storage of
fuel, waste oil, chemicals, hazardous
materials, or regulated substances.
Signs Art. 13; §94.13.02 New or altered signage requires applicable
review and permits.
Separate review
pending CUP
approval
No sign approval is included in the CUP. A
separate sign permit application has been
filed.
Occupancy §94.16.10
New tenant/use requires certificate of
occupancy and compliance with building
and fire requirements.
Pending SAFER Fire Department and Building Inspector
will inspect through the occupancy process.
CUP criteria §94.16.06(8)
Decision supported by substantial
evidence; conditions must be related,
reasonable, and measurable.
Meets with
conditions
Adopt the findings and conditions in this
report.
5. Parking, Circulation, and Loading
The Light Industrial use standard requires one off-street parking space for each employee on the largest work shift.
With 13 employees, the application must provide at least 13 employee spaces. Additional approved spaces are
necessary for any company passenger cars or pickup trucks parked outdoors.
The property is an existing developed site with an established parking lot. The applicant is not proposing changes to
the parking lot, stalls, drive aisles, access, or building footprint. The existing lot provides 17 parking spaces plus 1
accessible (handicapped) parking stall, for a total of 18 spaces, or 19 if the stall on the south side closest to the
street can be used. That exceeds the 13-space minimum and leaves 5 to 6 spaces for company passenger cars or
pickup trucks parked outdoors.
Because no physical changes to the site are proposed, staff is not requiring a new site plan. Parking, circulation, and
loading will continue in the existing configuration. Any future change to the parking layout, access, or loading area
would require Zoning Administrator and/or Plan Commission review.
Village of Weston | Planning & Development
Ganster Construction CUP No. 20260386 | 4
6. Wellhead Protection and Environmental Considerations
Because the property is within WHP-A, the approval should clearly distinguish an indoor contractor storage and
dispatch operation from vehicle maintenance, fueling, chemical storage, waste-fluid handling, or other activities
with greater groundwater risk. The CUP should not provide blanket authorization for those additional activities.
Staff recommends prohibiting onsite fueling and unapproved storage of gasoline, diesel fuel, waste oil, chemicals,
hazardous materials, or other regulated substances. Any vehicle or equipment servicing must be limited to activity
separately determined by the Public Works Director to comply with the Wellhead Protection requirements.
Expansion into regular repair, maintenance, washing, fabrication, or similar activity should require further Village
review.
7. Refuse, Lighting, Landscaping, and Occupancy
The principal site issue is refuse and recycling storage. There is no refuse and recycling enclosure on the property,
and there has never been one at this location. The submitted site plan shows a garbage dumpster and recycling cart
placed on a concrete pad in the parking lot in front of the building, at the southeast corner, in the same location used
by the previous business. Staff asked SAFER Fire Department to review this arrangement. On November 3, 2026,
SAFER Fire Marshal Martin Christiansen advised Planning Technician Valerie Parker that SAFER has no concerns with
the dumpsters located by the building because it is a concrete and metal building with no overhang. SAFER fire-
separation concerns with the current location have therefore been resolved. Exterior containers remain subject to
§94.12.06(2) and Municipal Code Chapter 66, §66.115, including the applicable enclosure requirement, and the Plan
Commission will need to determine whether an enclosure should be constructed as part of this CUP. If the Plan
Commission requires an enclosure, the applicant would need to submit a site plan for the enclosure, the enclosure
would need to meet the applicable accessory structure setbacks and maintain at least 10 feet of separation from
buildings, and the applicant's refuse hauler would need to sign off on its location. CUP approval should not be read
as approval of the current dumpster location without an enclosure unless the Plan Commission specifically decides
so.
No residentially zoned property is adjacent; therefore, the residential bufferyard standard specific to Light Industrial
uses is not triggered. Existing and otherwise-required landscaping remains subject to applicable code requirements
and should be maintained.
SAFER Fire Department and the Building Inspector will evaluate fire, life-safety, building-code, occupancy-
classification, and fire-suppression requirements through the occupancy-inspection process. The CUP should
require successful completion of that process before the use begins, or compliance with any written correction
schedule authorized by the applicable inspector.
8. Comprehensive Plan Consistency
The property is designated Mixed or Flex Commercial/Industrial on the Future Land Use Map. That designation
supports a compatible mix of commercial and light-industrial employment uses. The proposed indoor contractor
storage and dispatch operation is consistent with the designation when outdoor activity and off-site impacts are
controlled.
Plan Goal / Policy Direction Staff Analysis
Land Use Goal, §3.2 Promote sustainable development that adds
jobs, products, services, value, and beauty.
The proposal reuses an existing building for a 13-employee contractor
operation. Site, refuse, parking, and appearance conditions protect the
“value and beauty” component.
Land Use Objective 1,
§3.3(1)
Establish an efficient land-use pattern that
enhances the Village’s image.
Reuse of an existing developed, utility-served property is efficient;
refuse/recycling and site-maintenance conditions protect community
appearance.
Land Use Policy 1, §3.4(1) Maintain consistency among the Conditional approval applies the B-3 allowance, Light Industrial
Village of Weston | Planning & Development
Ganster Construction CUP No. 20260386 | 5
Plan Goal / Policy Direction Staff Analysis
Comprehensive Plan, zoning ordinance, and
land-use decisions.
standards, and CUP criteria to the Mixed or Flex Commercial/Industrial
designation.
Land Use Policy 3, §3.4(3) Encourage compatible transitions and
buffering to minimize conflicts.
Indoor storage, nuisance limits, loading controls, lighting standards, and
vehicle-storage limits reduce conflicts with nearby properties.
Land Use Policy 4, §3.4(4) Use the Plan and zoning ordinance to guide
development quality.
The recommended measurable conditions address parking, circulation,
refuse, lighting, loading, environmental protection, and site
maintenance.
Future Land Use
implementation, §3.5.1
Use the Future Land Use Map and related
policies for CUP and redevelopment decisions.
The Mixed or Flex Commercial/Industrial designation accommodates
the proposed low-impact contractor operation when conditioned for
compatibility.
Comprehensive Plan finding: The proposed conditional use is consistent with the Comprehensive Plan because it
is an employment-supporting, low-impact contractor storage and dispatch use within an existing developed property
designated Mixed or Flex Commercial/Industrial. The recommended conditions are necessary to maintain
compatibility and development quality.
9. Conditional Use Permit Review Criteria
§94.16.06(8) Criterion Staff Finding
Consistency with plans and
ordinances
Satisfied with conditions. The Mixed or Flex Commercial/Industrial designation supports compatible
commercial and light-industrial employment uses. Light Industrial is allowable in B-3 by CUP, and the
conditions implement the applicable operational and site standards.
Adverse impacts
Satisfied with conditions. The indoor nature of the operation, limited customer activity, controlled
outdoor vehicle parking, and restrictions on nuisance-producing and groundwater-risk activities avoid
substantial or undue adverse impacts.
Consistency of land uses, intensity,
and impacts
Satisfied with conditions. The use occupies an existing building and is limited to storage, dispatch, and
accessory office functions. Heavy vehicles, trailers, equipment, tools, and materials remain indoors.
Adequacy of public facilities and
services
Satisfied. The property is already developed and served by existing streets and utilities. Building and fire
requirements will be addressed through occupancy inspection.
Public benefit compared with adverse
impacts
Satisfied with conditions. Productive reuse, employment, and business activity outweigh the limited
potential impacts because those impacts are addressed through measurable conditions.
10. Recommended Conditions of Approval
1. Approved use and plans. Approval is limited to the Ganster Construction LLC contractor operation described in
the accepted application and operational plan: indoor storage of company construction equipment, tools,
materials, trucks, and trailers; employee reporting and dispatch; accessory administrative and billing activity; and
incidental package deliveries. No retail sales, customer service area, fabrication, regular vehicle/equipment
repair, or other principal use is approved unless separately authorized.
2. Operational intensity. The use may employ up to 13 employees on the largest work shift. A change that causes
required parking to exceed approved capacity or materially changes traffic, hours, noise, or site impacts requires
prior Zoning Administrator review and any additional approval determined necessary.
3. Hours. Routine employee arrival, dispatch, vehicle return, loading, and unloading shall occur between 5:00 a.m.
and 10:00 p.m. Activity outside those hours is limited to occasional emergency or weather-related construction
response and shall comply with all performance standards.
4. Indoor storage and outdoor vehicles. All construction materials, equipment, tools, utility trailers, heavy-duty
service trucks, straight trucks, and operational activities shall be contained within the building except during
active loading or unloading. Licensed and operable employee vehicles and company passenger cars or pickup
Village of Weston | Planning & Development
Ganster Construction CUP No. 20260386 | 6
trucks may be parked outdoors in approved spaces. No exterior storage of construction equipment, trailers,
pallets, materials, debris, fluids, or inoperable vehicles is permitted.
5. Performance standards. No noise, odor, dust, smoke, vibration, heat, glare, or similar operational impact may
violate §94.4.08(1) or Article 12. Vehicle idling shall be limited to the time reasonably necessary for safe operation
and dispatch.
6. Existing site conditions. Approval is based on the existing site layout. No changes to the building footprint,
parking lot, stalls, drive aisles, or access are proposed or approved. The existing parking lot provides 17 spaces
plus 1 accessible (handicapped) stall, for a total of 18 spaces, or 19 if the stall on the south side closest to the
street can be used.
7. Parking and circulation. At least 13 off-street employee spaces shall be provided and maintained. Parking,
outdoor passenger-car/pickup parking, drive aisles, and loading areas shall remain on-site and unobstructed in
the existing parking lot. Parking in fire lanes, landscape areas, or the public right-of-way is prohibited.
8. Loading. Loading and unloading shall occur inside the building or in existing on-site areas outside the minimum
required front yard, and shall not block parking, emergency access, circulation, or the public right-of-way.
9. Refuse and recycling (Plan Commission determination). There is no existing refuse and recycling enclosure on
the property. SAFER Fire Department reviewed the existing dumpster location on the concrete pad at the
southeast corner of the building and, on November 3, 2026, confirmed it has no concerns with that location. The
Plan Commission shall determine which of the following applies: (a) if the dumpsters are allowed without an
enclosure, refuse and recycling containers shall remain in the existing location on the concrete pad at the
southeast corner of the building as shown on the submitted site plan and reviewed by SAFER Fire Department,
and any relocation shall require Zoning Administrator and SAFER Fire Department review; (b) if an enclosure is
required, the applicant shall submit a site plan for the enclosure for Zoning Administrator approval, and the
enclosure shall meet §94.12.06(2) and Municipal Code Chapter 66, §66.115, meet the applicable accessory
structure setbacks, maintain at least 10 feet of separation from buildings, include written sign-off from the
applicant's refuse hauler on the location, be completed within a timeframe set by the Plan Commission, and keep
the gate closed except during collection or authorized access; or (c) refuse and recycling containers shall be
stored inside the building except on collection day. Until the Plan Commission's determination is met, containers
shall not block parking, drive aisles, or emergency access.
10. Lighting. Exterior lighting shall comply with §§94.12.09 and 94.12.11. Fixtures shall be directed and shielded to
prevent glare or spillover onto adjoining property and rights-of-way. New fixtures require staff review before
installation.
11. Landscaping and maintenance. Applicable landscaping shall be maintained. The property shall remain free of
accumulated debris, construction waste, and unapproved outdoor storage.
12. Wellhead protection. No onsite fueling or unapproved storage of gasoline, diesel fuel, waste oil, chemicals,
hazardous materials, or other regulated substances is permitted. Any vehicle/equipment maintenance, washing,
fluid handling, or similar activity requires prior written determination of compliance with the WHP-A requirements
and any additional approval required by the Zoning Administrator and/or Public Works Director.
13. Signs. No sign is approved through this CUP. New or modified signage shall comply with Article 13 and receive all
required permits before installation.
14. Occupancy inspection. Before commencing the use, the applicant shall obtain the required certificate of
occupancy and complete occupancy inspection. SAFER Fire Department and the Building Inspector shall identify
required fire, life-safety, building-code, occupancy-classification, or fire-suppression corrections. Required
corrections and approvals shall be completed before occupancy or within a written compliance schedule
authorized by the applicable inspector.
Village of Weston | Planning & Development
Ganster Construction CUP No. 20260386 | 7
15. Material changes. A material change in the approved use, tenant area, employee count, outdoor vehicle types or
quantity, outdoor activity, parking layout, loading location, refuse location, or existing site layout requires prior
written review by the Zoning Administrator and may require amendment of the CUP.
16. General compliance and enforcement. The property owner and operator shall comply with the approved plans,
this CUP, Chapter 94, and all applicable Village, county, state, and federal requirements. Violations are subject to
§94.16.19 and other remedies authorized by §94.16.06.
11. Staff Recommendation and Suggested Motion
Recommendation: Staff recommends approval of Conditional Use Permit No. 20260386 for Ganster Construction
LLC at 5900 Mesker Street, based on the findings in this report and subject to the conditions listed in Section 10.
Suggested motion: Move to approve Conditional Use Permit No. 20260386 for Ganster Construction LLC to
establish a Light Industrial contractor shop/contractor operations use at 5900 Mesker Street, based on the findings
contained in the staff analysis and subject to the recommended conditions of approval, with authorization for the
Zoning Administrator to make non-substantive corrections and finalize the recorded CUP document.
Item for Plan Commission Determination
• Refuse and recycling enclosure. The site has no enclosure and has never had one. Dumpsters are currently
placed on a concrete pad in the parking lot in front of the building, at the southeast corner, per the submitted site
plan. SAFER Fire Marshal Martin Christiansen confirmed on November 3, 2026 that SAFER has no concerns with
this location because the building is concrete and metal with no overhang. The Plan Commission must still
determine whether an enclosure should be constructed. If an enclosure is required, a site plan for the enclosure
is needed, it must meet accessory structure setbacks and be at least 10 feet from buildings, and the hauler must
sign off on its location (see Condition 9).
Materials Reviewed
• Conditional Use Permit and zoning permit application materials
• Operational Plan
• Supplemental Review Criteria responses
• Site Plan and Site Use exhibits
• Commercial Refuse and Recycling Plan
• SAFER Fire Marshal Martin Christiansen email to Valerie Parker regarding dumpster location, November 3, 2026
• Real Estate Tax Parcel record
• Village of Weston Chapter 94 Zoning, as amended through November 17, 2025
• Village of Weston Comprehensive Plan, including the Future Land Use Map and Chapter 3 Land Use goals and
policies
VILLAGE OF WESTON, MARATHON COUNTY, WI
CONDITIONAL USE PERMIT # 20260386
This CONDITIONAL USE PERMIT is approved this 9th day of November , 2026 by the PLAN COMMISSION of the
VILLAGE OF WESTON, to Ganster Construction LLC, as applicant/operator, with LAB Income Trust (U/A 8-22-2013);
Larry A. Busse, individually; and the Larry A. Busse Revocable Trust (U/A 1-26-1995), Larry A. Busse, Trustee, as property
owner.
WHEREAS, Ganster Construction LLC has applied for a Conditional Use Permit to operate a Light Industrial use,
consisting of a contractor shop/contractor operations, within the existing building at 5900 Mesker Street in the Village of
Weston; and
WHEREAS, the subject property is legally described as follows:
Lot 1 of Certified Survey Map No. 10355, recorded in Volume 42 of Certified Survey Maps, Page 178, as Document
No. 1144885, being part of Lot 5, Block 2, Weston Commercial Park, located in the SW 1/4 of the SE 1/4 of Section
16, Township 28 North, Range 8 East, Village of Weston, Marathon County, Wisconsin. (PIN 192 2808 164 0135);
and
WHEREAS, the property is zoned B -3 General Business, in which Light Industrial is a Conditional Use pursuant
to Figure 94.3.05 and Section 94.4.08(1) of the Village of Weston Municipal Code; and
WHEREAS, the subject property is located within the WHP-A Wellhead Protection Area Zone A Overlay District,
and the approved use is subject to the applicable Wellhead Protection Area requirements; and
WHEREAS, a petition for a Conditional Use Permit has been duly filed, reviewed by Village staff, noticed in
accordance with applicable law, and considered by the Plan Commission following a public hearing held on November 9,
2026; and
WHEREAS, after review of the application, supporting materials, testimony received at the public hearing, the
Village Comprehensive Plan, and the applicable provisions of Chapter 94 of the Village Code, the Plan Commission finds
that:
A. The proposed Light Industrial contractor shop/contractor operations use is consistent with the intent and purpose
of the B-3 General Business Zoning District and the Village of Weston Comprehensive Plan, including the Mixed
or Flex Commercial/Industrial Future Land Use designation;
B. The proposed use is conditionally permitted in the B-3 General Business District under Figure 94.3.05 and shall
comply with the applicable performance standards for Light Industrial uses in Section 94.4.08(1);
C. Subject to the conditions of this Conditional Use Permit, the proposed use will not result in a substantial or undue
adverse impact on nearby property, the character of the neighborhood, traffic, public rights-of-way, public health,
safety, or general welfare; and
D. The property is an existing developed site served by existing streets, access, and public utilities and services
adequate for the proposed use, subject to compliance with all applicable Village requirements and completion
of the required occupancy inspection; and
E. The Plan Commission's approval of this Conditional Use Permit is subject to the conditions contained herein,
including the condition precedent to commencement of the use established by Condition 14; and
WHEREAS, the conditional use shall not commence until the required certificate of occupancy has been obtained
and the SAFER Fire Department and Building Inspector have completed the occupancy inspection, with any required
corrections completed before occupancy or within a written compliance schedule authorized by the applicable inspector;
and
WHEREAS, upon discontinuance of the approved conditional use for a period exceeding three hundred sixty -five
(365) consecutive days, this Conditional Use Permit shall automatically become null and void. The burden of proof shall be
upon Ganster Construction LLC to demonstrate that the conditional use has remained in operation during such period; and
WHEREAS, this Conditional Use Permit is granted solely to Ganster Construction LLC and is limited to the
contractor shop/contractor operations use described in the approved operational plan (Exhibit B). This Conditional Use
Permit does not run with the land and shall not be transferred or assigned to any other business, operator, or use. Any other
business or operator seeking to establish a conditional use at the property, or any operation not consistent with Exhibit B,
shall require a new or amended Conditional Use Permit approved by the Plan Commission. This Conditional Use Permit
shall terminate when Ganster Construction LLC ceases to operate the approved u se at the property, subject to the
discontinuance provision above, or when it is modified or revoked in accordance with the Village of Weston Municipal
Code.
NOW, THEREFORE, BE IT RESOLVED, the PLAN COMMISSION of the Village of Weston, Marathon County,
Wisconsin, hereby grants Conditional Use Permit No. 20260386 authorizing a Light Industrial use, consisting of a contractor
shop/contractor operations, as defined in Section 94.4.08(1 ) of the Village of Weston Municipal Code, subject to the
following conditions:
1. The approved use is limited to the Ganster Construction LLC contractor shop/contractor operations use under
Section 94.4.08(1), as described in the approved operational plan (Exhibit B): indoor storage of company
construction equipment, tools, materials, t rucks, and trailers; employee reporting and dispatch; accessory
administrative and billing activity; and incidental package deliveries. No retail sales, customer service area,
fabrication, regular vehicle or equipment repair, or other principal use is approved unless separately authorized.
2. The use may employ up to thirteen (13) employees on the largest work shift. A change that causes required parking
to exceed approved capacity or materially changes traffic, hours, noise, or site impacts requires prior Zoning
Administrator review and any additional approval determined necessary.
3. Routine employee arrival, dispatch, vehicle return, loading, and unloading shall occur between 5:00 a.m. and 10:00
p.m. Activity outside those hours is limited to occasional emergency or weather-related construction response and
shall comply with all applicable performance standards.
4. All construction materials, equipment, tools, utility trailers, heavy -duty service trucks, straight trucks, and
operational activities shall be contained within the building except during active loading or unloading. Licensed
and operable employee vehicles and company passenger cars or pickup trucks may be parked outdoors in approved
spaces. No exterior storage of construction equipment, trailers, pallets, materials, debris, fluids, or inoperable
vehicles is permitted.
5. No noise, odor, dust, smoke, vibration, heat, glare, or similar operational impact may violate Section 94.4.08(1) or
Article 12 of the Village of Weston Zoning Code. Vehicle idling shall be limited to the time reasonably necessary
for safe operation and dispatch. No outdoor repair, fabrication, washing, or similar operational activity is permitted.
6. The submitted site plan shall be incorporated into this Conditional Use Permit as Exhibit A. Approval is based on
the existing site layout. No changes to the building footprint, parking lot, stalls, drive aisles, or access are proposed
or approved. The existing parking lot provides seventeen (17) spaces plus one (1) accessible stall, for a total of
eighteen (18) spaces, or nineteen (19) if the stall on the south side closest to the street is determined usable at final
occupancy inspection. Incorporation of the site plan does not constitute construction- plan approval, authorize
construction, or waive any separately required permits or approvals.
7. At least thirteen (13) off -street employee parking spaces shall be provided and maintained. Parking, outdoor
passenger-car and pickup-truck parking, drive aisles, and loading areas shall remain on-site and unobstructed within
the existing parking lot. Parking in fire lanes, landscape areas, or the public right-of-way is prohibited.
8. Loading and unloading shall occur inside the building or in existing on- site areas outside the minimum required
front yard, and shall not block parking, emergency access, circulation, or the public right-of-way.
9. Refuse and recycling containers shall be managed in accordance with the Commercial Refuse and Recycling Plan
(Exhibit C) and the Plan Commission's determination as follows. The SAFER Fire Department reviewed the
existing dumpster location on the concrete pad at the southeast corner of the building and, on November 3, 2026,
confirmed it has no concerns with that location. [PLAN COMMISSION TO SELECT ONE OPTION; DELETE
THE OTHERS BEFORE RECORDING] (a) if dumpsters are allowed without an enclosure, refuse and recycling
containers shall remain in the existing location on the concrete pad at the southeast corner of the building as shown
on the submitted site plan (Exhibit A) and reviewed by the SAFER Fire Department, and any relocation shall require
Zoning Administrator and SAFER Fire Department review; (b) if an enclosure is required, the applicant shall submit
a site plan for the enclosure for Zoning Administrator approval, and the enclosure shall comply with Section
94.12.06(2) and Municipal Code Chapter 66, Section 66.115, meet the applicable access ory structure setbacks,
maintain at least ten (10) feet of separation from buildings, include written sign -off from the applicant's refuse
hauler on the location, be completed within a timeframe set by the Plan Commission, and keep the gate closed
except during collection or authorized access; or (c) refuse and recycling containers shall be stored inside the
building except on collection day. Until the Plan Commission's determination is met, containers shall not block
parking, drive aisles, or emergency access.
10. Exterior lighting shall comply with Sections 94.12.09 and 94.12.11. Fixtures shall be directed and shielded to
prevent glare or spillover onto adjoining property and rights -of-way. New fixtures require staff review before
installation.
11. Applicable landscaping shall be maintained. The property shall remain free of accumulated debris, construction
waste, and unapproved outdoor storage.
12. No onsite fueling or unapproved storage of gasoline, diesel fuel, waste oil, chemicals, hazardous materials, or other
regulated substances is permitted. Any vehicle or equipment maintenance, washing, fluid handling, or similar
activity requires prior written determination of compliance with the WHP-A Wellhead Protection Area requirements
and any additional approval required by the Zoning Administrator and/or Director of Public Works.
13. No sign is approved through this Conditional Use Permit. New or modified signage shall comply with Article 13 of
the Village of Weston Zoning Code and receive all required permits before installation.
14. Before commencing the use, the applicant shall obtain the required certificate of occupancy under Section 94.16.10
and complete the occupancy inspection. The SAFER Fire Department and Building Inspector shall identify any
required fire, life -safety, buildi ng-code, occupancy- classification, or fire- suppression corrections. Required
corrections and approvals shall be completed before occupancy or within a written compliance schedule authorized
by the applicable inspector.
15. A material change in the approved use, tenant area, employee count, outdoor vehicle types or quantity, outdoor
activity, parking layout, loading location, refuse location, or existing site layout requires prior written review by the
Zoning Administrator and, where required, Plan Commission approval of an amended or new Conditional Use
Permit.
16. The property owner and operator shall comply with the approved plans, this Conditional Use Permit, Chapter 94,
and all applicable Village, Marathon County, State of Wisconsin, and federal requirements. This Conditional Use
Permit does not waive any other required permit, approval, inspection, or review. Violations are subject to Section
94.16.19 and other remedies authorized by Section 94.16.06.
Except as specifically modified herein, all uses permitted within the B- 3 General Business Zoning District shall remain
permitted. The conditions of this Conditional Use Permit and Exhibits A through C establish the approved use, operational
limitations, site-use areas, and refuse and recycling requirements. Exhibit D documents the Plan Commission's written
findings supporting approval, and Exhibit E documents the Plan Commission's action. Exhibits D and E are included as part
of the official record of approval but shall not be construed to impose requirements beyond those expressly stated in the
conditions of this Conditional Use Permit and Exhibits A through C.
Violation of any condition of this Conditional Use Permit may result in enforcement action or revocation of this Conditional
Use Permit in accordance with the Village of Weston Municipal Code.
Dated this 9th day of November, 2026
WESTON PLAN COMMISSION
By:
Luis Lopes Serrao, its Chair
ATTEST:
Jennifer L. Higgins, Zoning Administrator
STATE OF WISCONSIN)
) ss.
COUNTY OF MARATHON)
Personally, came before this _______ day of November 2026, the above-named Luis Lopes Serrao, Chair,
and Jennifer L. Higgins, Zoning Administrator, to me known to be the persons who execute the foregoing
instrument and acknowledge the same.
Notary Public
My Commission expires on _____________________.
THIS INSTRUMENT DRAFTED BY:
Jennifer Higgins, Village of Weston
Director, Planning and Development
Weston, WI 54476
EXHIBIT A – SITE PLAN
Project: 20260386
Applicant/Operator: Ganster Construction LLC
Property Owner: LAB Income Trust (U/A 8-22-2013); Larry A. Busse, individually; Larry A. Busse
Revocable Trust (U/A 1-26-1995), Larry A. Busse, Trustee
Location: 5900 Mesker Street, Weston, WI 54476
Parcel: 192 2808 164 0135
Zoning District: B-3 – General Business
Overlay District: WHP-A – Wellhead Protection Area Zone A
Purpose
Approved site plan establishing the existing site layout, parking, circulation, loading, and site-use areas for the
Light Industrial contractor shop/contractor operations use at 5900 Mesker Street. No changes to the building
footprint, parking lot, stalls, drive aisles, or access are approved. The site plan is incorporated into and made a
part of this Conditional Use Permit as Exhibit A. Incorporation of the site plan does not constitute construction-
plan approval or waive any separately required permits or approvals.
Approved Documents
Site Plan and Site Use exhibits – Ganster Construction LLC, 5900 Mesker Street, dated [insert date]
This exhibit is incorporated into and made a part of Conditional Use Permit #20260386.
Received 10/30/26
EXHIBIT B – APPROVED OPERATIONAL DESCRIPTION
Project: 20260386
Applicant/Operator: Ganster Construction LLC
Property Owner: LAB Income Trust (U/A 8-22-2013); Larry A. Busse, individually; Larry A. Busse
Revocable Trust (U/A 1-26-1995), Larry A. Busse, Trustee
Location: 5900 Mesker Street, Weston, WI 54476
Parcel: 192 2808 164 0135
Zoning District: B-3 – General Business
Overlay District: WHP-A – Wellhead Protection Area Zone A
Purpose
Approved operational description for the Light Industrial contractor shop/contractor operations use at 5900
Mesker Street.
Operational Description
Ganster Construction LLC will occupy the existing approximately 15,000-square-foot building as an employee
reporting and dispatch point and for indoor storage of company trucks, trailers, construction equipment, tools,
and materials. Employees report to the property, transfer to company vehicles, leave for off-site construction
work, and return company vehicles at the end of the workday. Accessory office and billing activity will occur
within the building. The operation includes approximately thirteen (13) employees, with package deliveries
approximately twice per week. Licensed employee vehicles and company passenger cars or pickup trucks may
remain outdoors in approved parking spaces within the existing parking lot. Heavy-duty service trucks, straight
trucks, utility trailers, construction equipment, tools, and materials shall remain inside the building except
during active loading or unloading. The facility will not include retail sales, a customer seating area, an outdoor
contractor yard, outdoor construction-material storage, fabrication, onsite fueling, or regular vehicle or
equipment repair. No changes to the building footprint or existing parking lot are proposed. Any future
expansion or material modification of the approved operation shall require review under the Conditional Use
Permit and applicable zoning requirements.
This exhibit is incorporated into and made a part of Conditional Use Permit #20260386.
EXHIBIT C – COMMERCIAL REFUSE AND RECYCLING PLAN
Project: 20260386
Applicant/Operator: Ganster Construction LLC
Property Owner: LAB Income Trust (U/A 8-22-2013); Larry A. Busse, individually; Larry A. Busse
Revocable Trust (U/A 1-26-1995), Larry A. Busse, Trustee
Location: 5900 Mesker Street, Weston, WI 54476
Parcel: 192 2808 164 0135
Zoning District: B-3 – General Business
Overlay District: WHP-A – Wellhead Protection Area Zone A
Purpose
The Commercial Refuse and Recycling Plan submitted with the application, as modified by the Plan
Commission's determination under Condition 9, is incorporated into and made a part of this Conditional Use
Permit as Exhibit C. If the Plan Commission requires a refuse and recycling enclosure, the enclosure site plan
approved by the Zoning Administrator, including written sign-off from the applicant's refuse hauler on the
location, shall be incorporated as part of this Exhibit C upon approval and shall control the location and design
of the enclosure.
Approved Document
Commercial Refuse and Recycling Plan – Ganster Construction LLC, 5900 Mesker Street; and, if required
under Condition 9, the refuse and recycling enclosure site plan approved by the Zoning Administrator.
This exhibit is incorporated into and made a part of Conditional Use Permit #20260386.
EXHIBIT D – PLAN COMMISSION WRITTEN
DETERMINATION DATED NOVEMBER 9, 2026
Project: 20260386
Applicant/Operator: Ganster Construction LLC
Property Owner: LAB Income Trust (U/A 8-22-2013); Larry A. Busse, individually; Larry A. Busse
Revocable Trust (U/A 1-26-1995), Larry A. Busse, Trustee
Location: 5900 Mesker Street, Weston, WI 54476
Parcel: 192 2808 164 0135
Zoning District: B-3 – General Business
Overlay District: WHP-A – Wellhead Protection Area Zone A
Purpose
The Conditional Use Permit Determination completed and approved by the Village of Weston Plan Commission
on November 9, 2026, documenting the Plan Commission's findings regarding the Conditional Use Permit
application, including the applicable conditional-use approval criteria under Section 94.16.06(8) and the basis
for approval of the Light Industrial contractor shop/contractor operations use.
Approved Document
Conditional Use Permit Determination by the Village of Weston Plan Commission, dated November 9, 2026.
This Exhibit D is incorporated into and made a part of Conditional Use Permit #20260386.
Application for Conditional Use Permit
CONDITIONAL PERMIT DETERMINATION
BY THE VILLAGE OF WESTON PLAN COMMISSION
Application/Petition No.: 20260386 Hearing Date: November 9, 2026
Applicant: Ganster Construction LLC
Location: 5900 Mesker Street, Weston, WI 54476
Description: Conditional Use Permit for Ganster Construction LLC to establish a Light Industrial use,
consisting of a contractor shop/contractor operations (indoor equipment storage and
employee dispatch), in the B-3 General Business District and within the WHP-A Wellhead
Protection Area Zone A Overlay District at 5900 Mesker Street.
Property Owner:
Parcel ID:
Property Area:
Lab Income Trust (Larry A. Busse)
192 2808 164 0135
1.01 acres (approximately 43,996 square feet); existing building approximately 15,000
square feet
The Department of Planning and Development of the Village of Weston, pursuant to the Village of Weston Zoning Code,
Article 16 Procedures and Administration, Section 94.16.06 Conditional Use Permits, hereby makes the following findings
and evaluation to the Village of Weston Plan Commission:
GENERAL INFORMATION:
Zoning: B-3 General Business; WHP-A Wellhead Protection Area Zone A Overlay
Definition:
94.2.02
B-3 General Business . The B -3 district accommodates a wide range of commercial uses, along with
compatible wholesale, light industrial and outdoor storage and display uses. Development within this
district is served by public sanitary sewer and water services. This district is intended for mapping (i)
along major highway corridors; (ii) outside of the Village’s neighborhood areas; and (iii) in areas planned
for commercial uses, and occasionally in areas planned for industrial uses , within the Comprehensive
Plan. (Predecessor district: B-3 General Commercial). Light Industrial is listed as a conditional use in the
B-3 district under Figure 94.3.05.
Sec 94.4.08 Industrial Land Use Types
(1) Light Industrial.
Light Industrial includes industrial facilities, manufacturing operations, and contractor shops at which all operations
are conducted entirely within an enclosed building, except for fully screened outdoor storage and loading operations.
Light Industrial facilities may not create nuisance conditions such as odor, noise, heat, vibration, or radiation
detectable at the property line, and may not pose a significant safety hazard.
Applicable Performance Standards (summarized):
1. All operations shall be conducted entirely within an enclosed building, except for fully screened outdoor
storage and loading operations.
2. No odor, noise, heat, vibration, radiation, or similar nuisance shall be detectable at the property line, and the
use shall not pose a significant safety hazard.
3. Section 94.4.08(1)(3): Loading, unloading, and storage areas shall not be located in the minimum required
front yard.
4. Section 94.4.08(1)(4): A bufferyard shall be provided along property borders abutting residentially zoned
property.
5. Section 94.4.08(1)(8): Minimum Required Off-Street Parking: one space for each employee on the largest
work shift.
The applicable performance standards have been reviewed and are addressed through the approved operational
layout and conditions of this Conditional Use Permit.
DETERMINATION (To be completed by the Plan Commission):
1. Is t he proposed conditional use consistent with the Comprehensive Plan, this Chapter, and all other plans,
programs, and ordinances adopted by the Village?
Applicant Response: Yes, we follow all rules and regulations of the Village of Weston.
Staff Analysis: Satisfied with conditions. See the Comprehensive Plan Consistency discussion in the Staff Analysis
in the meeting packet. The property is designated Mixed or Flex Commercial/Industrial on the Future Land Use
Map, which supports compatible commercial and light -industrial employment uses. Light Industrial (contractor
shop) is a conditional use in the B -3 district under Figure 94.3.05 and Section 94.4.08(1), and the recommended
conditions implement the applicable operational, site, and WHP-A standards. The use is reviewed as a contractor
operation; office and storage activities are accessory to that principal use.
Plan Commission Finding:
2. The proposed conditional use, in its proposed location and as depicted on the required site plan, will not result
in a substantial or undue adverse impact on nearby property, the character of the neighborhood,
environmental factors, traffic factors, parking, public improvements, public property or rights-of-way, or other
matters affecting the public health, safety, or general welfare, either as they now exist or as they may in the
future be developed as a result of the implementation of the provisions of this Chapter, the Comprehensive
Plan, or all other plans, programs, and ordinances adopted by the Village.
Applicant Response: No, we will not impact other businesses nearby, as no one does what we do. We will have
very little traffic, as our employees park in the a.m. and then don’t return until p.m.
Staff Analysis: Satisfied with conditions. The operation is primarily indoor equipment storage and employee
dispatch, with traffic concentrated at morning departure and end -of-
day return and package deliveries
approximately twice per week. No customer activity, outdoor co ntractor yard, or outdoor material storage is
proposed. Controlled outdoor vehicle parking, nuisance and idling limits, and restrictions on fueling, chemical
storage, and similar groundwater- risk activities within the WHP -A overlay avoid substantial or und ue adverse
impacts. The site has no refuse and recycling enclosure . Dumpsters are placed on a concrete pad in the parking
lot at the southeast corner of the building, and on November 3, 2026, SAFER Fire Marshal Martin Christiansen
confirmed that SAFER has no concerns with this location because the building is concrete and metal with no
overhang. The Plan Commission will need to determine whether an enclosure is required (see Condition (i)).
Plan Commission Finding:
3. Does the proposed conditional use maintain the desired consistency of land uses, land use intensities, and land
use impacts as related to the environs of the subject property?
Applicant Response: Yes, as it will only be used for storage for our equipment. No drilling or construction will take
place. We will not be doing anything to the land or building.
Staff Analysis: Satisfied with conditions. The use occupies an existing approximately 15,000-square-foot building
with approximately 13 employees and is limited to storage, dispatch, and accessory office functions. No changes
to the building footprint or parking lot are proposed. Heavy-duty trucks, trailers, equipment, tools, and materials
will remain indoors, and no residentially zoned property is adjacent to the site.
Plan Commission Finding:
4.
Is the proposed conditional use located in an area that will be adequately served by, and will not impose an
undue burden on, any of the improvements, facilities, utilities, or services provided by public agencies serving
the subject property?
Applicant Response: No, we will not be a burden to the facilities and utilities. There will be no improvements
done, as we are just renting and using the building for storage.
Staff Analysis: Satisfied. The property is already developed and served by existing streets and public utilities, and
no new public improvements are proposed. The existing lot provides 17 parking spaces plus 1 accessible stall (18
total, or 19 if the south stall nearest t he street is usable), exceeding the 13 -space minimum. Building, fire, and
life-safety requirements will be addressed by SAFER Fire Department and the Building Inspector through the
occupancy inspection process.
Plan Commission Finding:
5.
Do the potential public benefits of the proposed conditional use outweigh potential adverse impacts of the
proposed conditional use, after taking into consideration the applicant’s proposal and any requirements
recommended by the applicant to ameliorate such impacts.
Applicant Response: Yes, public benefits outweigh any impacts. We will use the shop solely for storage of
equipment. Supports local businesses by improving infrastructure that improves communication.
Staff Analysis: Satisfied with conditions. Productive reuse of an existing building, local employment, and business
activity outweigh the limited potential impacts of the use, because those impacts are addressed through
measurable conditions on indoor storage, outdoor vehicles, hours, nuisance, refuse, lighting, wellhead protection,
and occupancy.
Plan Commission Finding:
BACKGROUND INFORMATION:
Ganster Construction LLC is requesting a Conditional Use Permit to occupy an existing approximately 15,000-square-
foot building at 5900 Mesker Street for a contractor operation, classified as Light Industrial under Section 94.4.08(1).
The 1.01-acre parcel is described in the County record as Lot 1, CSM #10355, being part of Lot 5, Block 2, Weston
Commercial Park, in the SW 1/4 of the SE 1/4, Section 16, T28N, R8E. The property is zoned B-3 – General Business, is
located within the WHP-A – Wellhead Protection Area Zone A Overlay District, and is designated Mixed or Flex
Commercial/Industrial on the Future Land Use Map. The County parcel record lists Lab Income Trust and related Larry
A. Busse trust/individual interests as the property owner. No residentially zoned property is directly adjacent to the
site.
The application materials, including the October 1, 2026 Operational Plan, describe the building as storage for
company equipment and an employee reporting point. Employees arrive in the morning, pick up a company truck,
leave for off-site work, and return at the end of the day to drop off the truck. The operation runs five days per week
with no set hours, has approximately 13 employees, and receives package deliveries approximately twice per week.
Accessory office and billing activity would occur in the building. No retail sales, customer seating area, outdoor
contractor yard, or outdoor storage is proposed. Refuse service is provided by Harter’s, with a dumpster located in
front of the building to the left of the garage door and a rolling cart for recycling. The submitted site plan shows the
dumpster and recycling cart on a concrete pad in the parking lot at the southeast corner of the building, the same
location used by the previous business. On November 3, 2026, SAFER Fire Marshal Martin Christiansen advised
Planning Technician Valerie Parker that SAFER has no concerns with the dumpsters at this location because the
building is concrete and metal with no overhang.
CURRENT PROPERTY CONDITIONS:
The subject property is an existing developed commercial/industrial site with an approximately 15,000 -square-foot
building and an established paved parking lot providing 17 parking spaces plus 1 accessible stall (18 total, or 19 if the south
stall nearest the street is usable). There is no refuse and recycling enclosure on the property, and there has never been
one at this location. Dumpsters are currently placed on a concrete pad in the parking lot in front of the building, at the
southeast corner, per the submitted site plan; SAFER Fire Department has confirmed it has no concerns with this location.
No changes to the building footprint, parking lot, stalls, drive aisles, or access are proposed with the CUP application.
REQUIRED FINDINGS
Based on staff review and the applicable standards of Section 94.4. 08(1), the following findings are provided for Plan
Commission consideration:
• Land use classification and district consistency. The proposed operation is appropriately classified as Light
Industrial under Section 94.4.08(1), which includes contractor shops where operations are conducted within an
enclosed building. Under Figure 94.3.05, Light Industrial is a conditional use in the B-3 – General Business
District. Office and storage activities are accessory to the principal contractor operation, so the use is not
reviewed as a general office or warehousing use.
• Enclosed operations. Section 94.4.08(1) requires operations to be conducted inside, except for fully screened
outdoor storage and loading. Heavy-duty service trucks, straight trucks, utility trailers, construction equipment,
tools, and materials will remain indoors except during active loading or unloading. Licensed employee vehicles
and company passenger cars or pickup trucks may be parked outdoors in approved spaces.
• Nuisance standards. No odor, noise, heat, vibration, radiation, glare, dust, or similar nuisance may be detectable
at the property line under Section 94.4.08(1) and Article 12. The conditions limit idling and prohibit outdoor
repair, fabrication, washing, or similar operational activity.
• Required front yard and loading. Sections 94.4.08(1)(3) and 94.12.10 prohibit loading, unloading, and storage in
the minimum required front yard. Loading will occur inside the building or in existing on-site areas outside the
minimum required front yard.
• Off-street parking. Section 94.4.08(1)(8) requires one space for each employee on the largest work shift. With
13 employees, 13 spaces are required. The existing lot provides 17 spaces plus 1 accessible stall, for 18 total (or
19 if the south stall nearest the street is usable, to be determined at final occupancy inspection), leaving room
for outdoor company car and pickup parking. Parking and circulation remain in the existing configuration under
Section 94.12.09, and no new site plan is required.
• Residential bufferyard. No residentially zoned parcel is adjacent; therefore, the Light Industrial bufferyard
requirement under Section 94.4.08(1)(4) is not triggered. Other applicable landscaping under Section 94.11.02
must be maintained.
• Refuse and recycling. Exterior containers are subject to Section 94.12.06(2) and Municipal Code Chapter 66,
Section 66.115. No enclosure exists or has ever existed on site. The dumpsters are placed on a concrete pad in
the front parking lot at the southeast corner of the building per the submitted site plan. On November 3, 2026,
SAFER Fire Marshal Martin Christiansen confirmed that SAFER has no concerns with this location because the
building is concrete and metal with no overhang. The Plan Commission will need to determine whether an
enclosure must be constructed.
• WHP-A groundwater protection. Because the property lies within the WHP-A – Wellhead Protection Area Zone
A Overlay District, the approval is limited to indoor contractor storage and dispatch and does not authorize
onsite fueling or unapproved storage of fuel, waste oil, chemicals, hazardous materials, or other regulated
substances. Any vehicle or equipment maintenance, washing, or fluid handling requires prior written
determination of WHP-A compliance.
• Lighting, signs, and occupancy. Exterior lighting must comply with Sections 94.12.09 and 94.12.11. No sign is
approved through this CUP; a separate sign permit application has been filed under Article 13. A certificate of
occupancy and inspection by SAFER Fire Department and the Building Inspector are required under Section
94.16.10 before the use begins.
• Overall finding. Subject to the proposed CUP conditions and continued compliance with the Section 94.4.08(1)
standards, staff finds that the proposed use is compatible with the existing developed site, will be adequately
served by existing access and public services, and is not expected to create a substantial or undue adverse
impact on nearby property, traffic, parking, the public right-of-way, groundwater, or the public health, safety,
and general welfare.
ANALYSIS
Staff reviewed the proposed use, the zoning permit application, the October 1, 2026 Operational Plan, the Supplemental
Review Criteria responses, the Site Plan and Site Use exhibits, the Commercial Refuse and Recycling Plan, the November
3, 2026 email from SAFER Fire Marshal Martin Christiansen to Valerie Parker regarding the dumpster location, and the
parcel record. The proposed operation is appropriately classified as Light Industrial under Section 94.4.08(1) because its
principal function is a contractor shop used for indoor storage of company vehicles, trailers, equipment, tools, and
materials, together with employee reporting and dispatch. Accessory office and billing activity may occur only as
subordinate to the approved contractor operation.
Specifically:
• Scale and intensity. The operation has approximately 13 employees, operates five days per week, and receives
package deliveries approximately twice per week. Activity is concentrated at morning departure and end-of-day
vehicle return. This limited intensity is compatible with the existing developed site, subject to continued
compliance with the approved operational limits.
• Indoor storage and outdoor vehicles. The applicant proposes no outdoor storage. Heavy-duty trucks, trailers,
equipment, tools, and materials should remain inside except during active loading or unloading. Outdoor
parking should be limited to employee vehicles and company passenger cars or pickup trucks in approved
spaces.
• Hours. The Operational Plan does not establish fixed hours. Staff recommends limiting routine arrival, dispatch,
vehicle return, loading, and unloading to 5:00 a.m. to 10:00 p.m., while allowing occasional emergency or
weather-related response.
• Parking and circulation. The existing lot provides 18 spaces (or 19 if the south stall nearest the street is usable),
exceeding the 13-space requirement and leaving 5 to 6 spaces for company passenger cars or pickup trucks.
Because no physical site changes are proposed, staff is not requiring a new site plan. Any future change to the
parking layout, access, or loading area would require Zoning Administrator and/or Plan Commission review.
• Refuse and recycling. This is the principal site issue. There is no enclosure on the property, and there has never
been one at this location. The submitted site plan shows the dumpster and recycling cart on a concrete pad in
the parking lot in front of the building, at the southeast corner, in the same location used by the previous
business. Staff asked SAFER Fire Department to review this arrangement, and on November 3, 2026, SAFER Fire
Marshal Martin Christiansen advised that SAFER has no concerns with the dumpsters located by the building
because it is a concrete and metal building with no overhang. SAFER fire-separation concerns with the current
location have therefore been resolved. Exterior containers remain subject to Section 94.12.06(2) and Municipal
Code Chapter 66, Section 66.115, and the Plan Commission will need to determine whether an enclosure should
be constructed. If an enclosure is required, the applicant must submit a site plan for the enclosure, meet
accessory structure setbacks, maintain at least 10 feet of separation from buildings, and provide refuse hauler
sign-off on the location. CUP approval should not be read as approval of the current dumpster location without
an enclosure unless the Plan Commission specifically decides so.
• WHP-A review. The approval should clearly distinguish an indoor contractor storage and dispatch operation
from vehicle maintenance, fueling, chemical storage, waste-fluid handling, or other activities with greater
groundwater risk. Any vehicle or equipment servicing must be limited to activity separately determined by the
Director of Public Works to comply with the Wellhead Protection requirements.
• Occupancy. SAFER Fire Department and the Building Inspector will evaluate fire, life-safety, building-code,
occupancy-classification, and fire-suppression requirements through the occupancy inspection process, which
must be completed before the use begins or under a written correction schedule authorized by the applicable
inspector.
Based on the submitted materials, staff finds that the proposed contractor operation can satisfy Section 94.4. 08(1) and
the general Conditional Use Permit approval criteria of Section 94.16.06(8) if it is operated substantially as represented,
heavier trucks, trailers, equipment, tools, and materials remain indoors, the Plan Commission’s refuse and recycling
determination is satisfied, and the occupancy requirements are completed. The accepted application and Operational Plan
should be incorporated as the approved description of the use.
PLAN COMMISSION ACTION OPTIONS FOR NOVEMBER 9, 2026:
1) Approve the Conditional Use Permit with conditions. Approve Conditional Use Permit Project # 20260386 for
Ganster Construction LLC to establish a Light Industrial contractor shop/contractor operations use at 5900 Mesker
Street pursuant to Section 94.4.08(1) of the Village of Weston Zoning Code, subject to the following conditions:
The site has no existing refuse and recycling enclosure, and dumpsters are currently placed on a concrete pad in
the front parking lot at the southeast corner of the building per the submitted site plan. On November 3, 2026,
SAFER Fire Marshal Martin Christiansen confirmed that SAFER has no concerns with this location because the
building is concrete and metal with no overhang. The Plan Commission must determine under Condition (i )
whether a refuse and recycling enclosure is required as part of this Conditional Use Permit.
a. Approved use and plans. Approval is limited to the Ganster Construction LLC contractor operation
described in the accepted application and Operational Plan: indoor storage of company construction
equipment, tools, materials, trucks, and trailers; employee reporting and dispatch; accessory
administrative and billing activity; and incidental package deliveries. No retail sales, customer service area,
fabrication, regular vehicle/equipment repair, or other principal use is approved unless separately
authorized.
b. Operational intensity. The use may employ up to 13 employees on the largest work shift. A change that
causes required parking to exceed approved capacity or materially changes traffic, hours, noise, or site
impacts requires prior Zoning Administrator review and any additional approval determined necessary.
c. Hours. Routine employee arrival, dispatch, vehicle return, loading, and unloading shall occur between
5:00 a.m. and 10:00 p.m. Activity outside those hours is limited to occasional emergency or weather-
related construction response and shall comply with all performance standards.
d. Indoor storage and outdoor vehicles. All construction materials, equipment, tools, utility trailers, heavy-
duty service trucks, straight trucks, and operational activities shall be contained within the building except
during active loading or unloading. Licensed and operable employee vehicles and company passenger cars
or pickup trucks may be parked outdoors in approved spaces. No exterior storage of construction
equipment, trailers, pallets, materials, debris, fluids, or inoperable vehicles is permitted.
e. Performance standards. No noise, odor, dust, smoke, vibration, heat, glare, or similar operational impact
may violate Section 94.4.08(1) or Article 12. Vehicle idling shall be limited to the time reasonably
necessary for safe operation and dispatch.
f. Existing site conditions. Approval is based on the existing site layout. No changes to the building footprint,
parking lot, stalls, drive aisles, or access are proposed or approved. The existing parking lot provides 17
spaces plus 1 accessible stall, for a total of 18 spaces, or 19 if the stall on the south side closest to the
street can be used.
g. Parking and circulation. At least 13 off-street employee spaces shall be provided and maintained. Parking,
outdoor passenger -car/pickup parking, drive aisles, and loading areas shall remain on -site and
unobstructed in the existing parking lot. Parking in fire lanes, landscape areas, or the public right -of-way
is prohibited.
h. Loading. Loading and unloading shall occur inside the building or in existing on -site areas outside the
minimum required front yard, and shall not block parking, emergency access, circulation, or the public
right-of-way.
i. Refuse and recycling (Plan Commission determination) . There is no existing refuse and recycling
enclosure on the property. SAFER Fire Department reviewed the existing dumpster location on the
concrete pad at the southeast corner of the building and, on November 3, 2026, confirmed it has no
concerns with that location. The Plan Commission shall determine which of the following applies: (1) if
the dumpsters are allowed without an enclosure, refuse and recycling containers shall remain in the
existing location on the concrete pad at the southeast corner of the building as shown on the submitted
site plan and reviewed by SAFER Fire Department, and any relocation shall require Zoning Administrator
and SAFER Fire Department review ; (2) if an enclosure is required, the applicant shall submit a site plan
for the enclosure for Zoning Administrator approval, and the enclosure shall meet Section 94.12.06(2) and
Municipal Code Chapter 66, Section 66.115, meet the applicable accessory structure setbacks, maintain
at least 10 feet of separation from buildings, include written sign -off from the applicant’s refuse hauler
on the location, be completed within a timeframe set by the Plan Commission, and keep the gate closed
except during collection or authorized access; or (3) refuse and recycling containers shall be stored inside
the building except on collection day. Until the Plan Commission’s determination is met, containers shall
not block parking, drive aisles, or emergency access.
j. Lighting. Exterior lighting shall comply with Sections 94.12.09 and 94.12.11. Fixtures shall be directed and
shielded to prevent glare or spillover onto adjoining property and rights-of-way. New fixtures require staff
review before installation.
k. Landscaping and maintenance. Applicable landscaping shall be maintained. The property shall remain
free of accumulated debris, construction waste, and unapproved outdoor storage.
l. Wellhead protection. No onsite fueling or unapproved storage of gasoline, diesel fuel, waste oil,
chemicals, hazardous materials, or other regulated substances is permitted. Any vehicle/equipment
maintenance, washing, fluid handling, or similar activity requires prior written determination of
compliance with the WHP -A requirements and any additional approval required by the Zoning
Administrator and/or Director of Public Works.
m. Signs. No sign is approved through this CUP. New or modified signage shall comply with Article 13 and
receive all required permits before installation.
n. Occupancy inspection. Before commencing the use, the applicant shall obtain the required certificate of
occupancy and complete occupancy inspection. SAFER Fire Department and the Building Inspector shall
identify required fire, life-safety, building-code, occupancy-classification, or fire-suppression corrections.
Required corrections and approvals shall be completed before occupancy or within a written compliance
schedule authorized by the applicable inspector.
o. Material changes. A material change in the approved use, tenant area, employee count, outdoor vehicle
types or quantity, outdoor activity, parking layout, loading location, refuse location, or existing site layout
requires prior written review by the Zoning Administrator and may require amendment of the CUP.
p. General compliance and enforcement. The property owner and operator shall comply with the approved
plans, this CUP, Chapter 94, and all applicable Village, Marathon County, State of Wisconsin, and federal
requirements. This CUP does not waive any other required permit, approval, inspection, or review.
Violations are subject to Section 94.16.19 and other remedies authorized by Section 94.16.06.
2) Approve with modified conditions. Approve the CUP with the conditions above as modified by the Plan
Commission, including any specific determination on the refuse and recycling enclosure, hours of operation, or
outdoor vehicle parking.
3) Defer action. Defer final action after the public hearing to allow the applicant to submit additional information
requested by the Plan Commission, such as a revised refuse and recycling location or enclosure site plan. Staff
would return the matter to the Plan Commission with the final Conditional Use Permit and proposed conditions
once the requested information is received.
4) Deny the Conditional Use Permit. State the specific findings and reasons supporting denial based on the
applicable Conditional Use Permit criteria and ordinance requirements.
FINAL PLAN COMMISSION DETERMINATION
The Plan Commission, having conducted the public hearing on November 9, 2026, reviewed the application, staff analysis,
submitted plans and operational materials, public testimony, and applicable provisions of the Village of Weston Zoning
Code, hereby:
☐ APPROVES the Conditional Use Permit in accordance with Action Option No. ___ and based on the findings contained
in this Determination, subject to the conditions outlined herein, as amended by the Plan Commission.
☐ DEFERS action pending submittal of the additional information identified by the Plan Commission.
☐ DENIES the Conditional Use Permit for the reasons stated below.
Motion:
Vote:
Additional Conditions/Amendments:
Plan Commission Chair: ______________________________________________ Date: ___________________
Commission Clerk: __________________________________________________ Date: ___________________
EXHIBIT E – CERTIFIED PLAN COMMISSION ACTION /
MINUTES EXCERPT DATED NOVEMBER 9, 2026
Project: 20260386
Conditional Use Permit – 5900 Mesker Street
Plan Commission Meeting: November 9, 2026
Action Taken:
The Village of Weston Plan Commission conducted the required public hearing and took action on Conditional
Use Permit Project #20260386 for Ganster Construction LLC to establish a Light Industrial contractor
shop/contractor operations use at 5900 Mesker Street pursuant to Figure 94.3.05 and Section 94.4.08(1) of the
Village of Weston Zoning Code.
Motion: Motion by [______], second by [______], to approve Project No. 20260386, based on the findings
contained in the Determination and subject to the recommended conditions of approval, with refuse and
recycling Option [(a)/(b)/(c)] selected under Condition 9, and with authorization for the Zoning Administrator
to make non-substantive corrections and finalize the recorded Conditional Use Permit document. [Insert any
amendments and motion result.]
Vote: Yes: __; No: __; Abstain: __; Not Voting: __. Result: ____.
Cert
ified Excerpt:
This exhibit is a true and correct excerpt of the official minutes of the Village of Weston Plan Commission
meeting held on November 9, 2026, relating to Project #20260386.
REQUEST FOR CONSIDERATION
VILLAGE OF WESTON
4747 CAMP PHILLIPS ROAD
Public Mtg/Date: Plan Commission, November 9, 2026
Description: Discussion and recommendation to Board regarding Project No. 20260390,
a request to approve the Carter Avenue Condominium Plat, Declaration,
and Bylaws, for 3404 and 3406 Carter Avenue.
From: Jennifer Higgins, Planning & Development Director/Zoning Administrator
Question: Should the Plan Commission recommend that the Village Board conditionally
approve the Carter Avenue Condominium Plat and associated condominium
documents converting the existing two- family residence at 3404 and 3406
Carter Avenue into a two-unit residential condominium?
BACKGROUND
The applicants propose to convert the existing two-family residence at 3404 and 3406 Carter Avenue
into a two- unit, non-expandable residential condominium. The plat covers part of Lot 4 of Pete &
Stan’s Addition. Unit 1 (3404 Carter Avenue) and Unit 2 (3406 Carter Avenue) each contain 1,727
square feet of living area, and each unit is assigned a 50 percent interest in the common elements
and one vote in the Carter Av enue Condominiums Association, Inc., which will have a two- member
board with one director representing each unit. The Declaration assigns the land, foundations,
structural framing, party wall, roof, exterior wall assemblies, shared utilities, drainage, and shared
irrigation system as common elements . Driveways, yards, and unit -specific exterior areas are
intended to be limited common elements, subject to clear identification and assignment in the
Declaration and consistent graphic depiction on the condominium plat where feasible.
Zoning (Chapter 94). The property is zoned 2F Two Family Residential, where a two- family
residence is a permitted use. The condominium changes the form of ownership only; no new units,
footprint changes, or access changes are proposed. Staff will confirm the existing driveway access
remains compliant with Chapter 71 and off-street parking with Chapter 94. The 12-foot by 20- foot
shed serving Unit 1 was recently relocated under Residential Accessory Building Permit No.
202601721, and Residential Electrical Permit No. 202601722 was issued for service to the shed;
required inspections under both permits must be confirmed. The fence is being relocated to the west
property line. The final plat must show the shed’s actual location, dimensions, and setbacks and the
fence’s completed location. If the shed is for the exclusive use of Unit 1, the Declaration must assign
it as a limited common element of Unit 1.
Condominium ownership does not legalize any existing
nonconformity.
Subdivision Ordinance (Chapter 74). The plat substantially complies with Section 74.3.04 and Wis.
Stat. § 703.11, subject to the shed and fence corrections and final surveyor and staff review. The
main deficiencies are in the Declaration, which does not yet meet Section 74.1.04(5 ): it makes
reserves optional rather than establishing a mandatory escrow account, lacks a clear voluntary
termination provision, and does not require Village Board consent before amendment or termination.
The dispute- resolution process is generally compliant. The Declaration also needs a Village
certification page, blank fields must be completed, and required easements must be recorded by
separate instrument and referenced on the plat (Section 74.6.14).
REQUEST FOR CONSIDERATION
VILLAGE OF WESTON
4747 CAMP PHILLIPS ROAD
Comprehensive Plan. The proposal is generally consistent with the 2024 Comprehensive Plan
(adopted December 16, 2024), with no identified land- use conflict. The property is designated
Moderate Density Village Residential on the Future Land Use Map, and the proposal is consistent
with that designation. It retains an existing residential use, expands ownership choice without new
infrastructure demand, reuses existing streets and utilities, and does not create a material traffic
increase. Full consistency depends on the condominium documents meeting the mandatory Chapter
74 pro
tections, particularly escrow funding, voluntary termination, and Village consent over
amendments.
Attached Docs: Staff Report – Carter Avenue Condominiums; Carter Avenue Condominium
Plat (Vreeland Associates, Inc., dated September 14, 2026); Declaration of
Condominium of Carter Avenue Condominiums; Bylaws of Carter Avenue
Condominiums Association, Inc.
Committee Action: Plan Commission recommendation to the Village Board.
Fiscal Impact: None to the Village. No new public infrastructure is proposed. The
applicants are responsible for all required fees and reimbursement of
Village consultant costs.
Recommendation: Staff recommends conditional approval, subject to the following conditions:
1. Final approval by the Zoning Administrator, Director of Public Works, and
other reviewing departments as applicable.
2. Revision of the Declaration and Bylaws to fully comply with Section
74.1.04(5), including mandatory escrow funding, voluntary termination, and
Village Board consent before modification or termination of the required
provisions, and addition of a Village certification page to the Declaration for
execution by the Village.
3. Revision of the final condominium plat to accurately reflect existing
physical conditions, including the actual location, dimensions, and setbacks
of the relocated shed,
the fence in its completed location along the west
property line, driveways, parking areas, and the units, buildings, and physical
common elements to the extent required by Wis. Stat. § 703.11. The
Declaration shall clearly identify the common and limited common elements,
assign limited common elements to the applicable unit, and establish the
associated use, access, maintenance, repair, replacement, and cost
responsibilities. The final plat and Declaration shall be consistent with one
another.
4. Final plat compliance with Wis. Stat. § 703.11 and all practical submittal
requirements under Sections 74.3.01 and 74.3.04.
5.
Preparation, approval, and recording of all required access, utility,
drainage, irrigation, and maintenance easements by separate instrument,
with appropriate references on the condominium plat.
6. Correction of all drafting blanks and inconsistencies in the Declaration,
Bylaws, and plat before execution.
7. Payment of all required fees and reimbursement of Village consultant
costs.
REQUEST FOR CONSIDERATION
VILLAGE OF WESTON
4747 CAMP PHILLIPS ROAD
8. Recording of the approved condominium plat and all associated
documents concurrently with the Marathon County Register of Deeds,
followed by delivery of recorded copies to the Village within 30 days.
9. No representation is made by this approval regarding private title,
mortgage priority, tax treatment, building- code compliance, or enforceability
of private provisions not required or approved by the Village.
RECOMMENDED LANGUAGE FOR OFFICIAL ACTION
Motion to recommend conditional approval to the Village Board of Project No. 20260390, the Carter
Avenue Condominium Plat and associated Declaration and Bylaws for 3404 and 3406 Carter Avenue,
subject to the conditions identified in the Planning and Development Department staff report,
including final compliance with Chapters 71, 74, and 94 of the Weston Municipal Code, Wis. Stat. ch.
703, the Village of Weston Comprehensive Plan, and final review and approval by Village staff.
ADDITIONAL ACTION: Village Board approval of the condominium plat and Declaration. The plat
and all associated documents must be approved and recorded before any
permits tied to the condominium reconfiguration are issued (Sections
74.8.02–.03).
VILLAGE OF WESTON | PLANNING & DEVELOPMENT
Carter Avenue Condominiums | Project No. 20260390 | Staff Report
STAFF REPORT
Carter Avenue Condominiums
3404 and 3406 Carter Avenue | Condominium Plat Review
Report Item Information
Project No. 20260390
Applicant / Declarants John S. Sondelski and Julie A. Mayer
Surveyor Dustin M. Vreeland, PLS, Vreeland Associates, Inc.
Request Approval of a two-unit residential condominium plat and associated Declaration and Bylaws
Existing development Existing two-family residential building with two dwelling units
Zoning / Future land use 2F Two Family Residential / Moderate Density Village Residential
Applicable review Municipal Code Chapters 71, 74, and 94; Wis. Stat. ch. 703; 2024 Comprehensive Plan
Staff recommendation Conditional approval, subject to correction of the Chapter 74 condominium-document
deficiencies, plat revisions, and completion of technical review conditions listed below
EXECUTIVE SUMMARY
The proposal converts the existing two-family residence at 3404 and 3406 Carter Avenue into a two-
unit, non-expandable residential condominium. The condominium form of ownership does not, by itself,
change the existing land use, dwelling-unit count, building footprint, access pattern, or demand on public
facilities. The land-use concept is therefore generally consistent with the residential character of the site and
with Comprehensive Plan policies that support a range of housing choices and reinvestment in existing
developed neighborhoods.
The primary issues are within the condominium documents, with limited corrections needed on the
plat. Section 74.1.04(5) requires every condominium to include: (1) a dispute-resolution mechanism for
common and limited common elements; (2) a mandatory, sufficiently funded escrow account; (3) a voluntary
termination provision; and (4) a declaration of easements, restrictions, covenants and conditions approved by
the Village Board and recorded. These provisions must also require Village Board consent before modification
or termination. The submitted Declaration contains a detailed maintenance and protective-work process, but it
does not establish the required mandatory escrow account, does not clearly state a voluntary termination
procedure, and does not reserve Village Board consent over modification or termination. In fact, the Declaration
states that reserves may be maintained but are not required, which conflicts with the mandatory escrow
requirement.
BACKGROUND AND PROPOSAL
• The plat covers part of Lot 4 of Pete & Stan’s Addition in the Village of Weston and identifies two
condominium units associated with the existing attached two-family building.
• Unit 1 is addressed as 3404 Carter Avenue and Unit 2 as 3406 Carter Avenue.
• The proposed condominium is non-expandable and assigns each unit a 50 percent interest in the common
elements and one vote in the association.
• T he submitted Declaration assigns the land, foundations, structural framing, party wall, roof, exterior wall
assemblies, shared utilities, drainage, and shared irrigation system as common elements. Driveways,
yards, and unit-specific exterior areas are intended to be limited common elements, subject to clear
identification and assignment in the Declaration and consistent graphic depiction on the condominium plat
where feasible.
• The proposal establishes the Carter Avenue Condominiums Association, Inc., with a two-member board,
one director representing each unit.
CHAPTER 74 SUBDIVISION ORDINANCE REVIEW
Code provision Staff finding Status / required action
74.1.04(1)-(2):
Jurisdiction and
compliance
A condominium development requires
Village approval and must comply with
Chapter 74, Chapter 94, the
Comprehensive Plan, Wis. Stat. ch. 703,
and other applicable law.
Conditionally compliant
VILLAGE OF WESTON | PLANNING & DEVELOPMENT
Carter Avenue Condominiums | Project No. 20260390 | Staff Report
74.1.04(5)(a): Dispute
resolution
The Declaration provides emergency work,
necessary protective work, qualified
opinions, independent technical review, cost
allocation, notice, and enforcement
procedures.
Generally compliant; retain in final documents
74.1.04(5)(b): Mandatory
escrow
The Declaration states reserves may be
maintained but are not required. No
mandatory escrow account or minimum
funding mechanism is established.
Not compliant. Revise Declaration and Bylaws to
establish a mandatory escrow/reserve account with
a defined funding method adequate for common
and limited common element obligations.
74.1.04(5)(c): Voluntary
termination
The documents address casualty and a
decision not to rebuild, but do not clearly
provide a general voluntary termination
process.
Not compliant. Add a voluntary termination
provision consistent with Wis. Stat. ch. 703.
74.1.04(5): Village Board
consent
The documents generally allow amendment
by both unit owners and do not require
Village Board consent before modification
or termination of the required Chapter 74
provisions.
Not compliant. Add language requiring prior written
Village Board consent before amendment, repeal,
or termination of the required provisions.
74.1.04(5)(d):
Declaration / covenants
A detailed Declaration has been submitted
and is intended for recording.
Conditionally compliant, subject to Village Board
approval and correction of blanks and deficiencies.
The Declaration must include a Village certification
page for execution by the Village.
74.3.01: Combined
condominium review
A condominium plat conforming to Wis.
Stat. § 703.11 substitutes for the preliminary
plat; preliminary and final review stages are
combined as practical.
Applicable review procedure
74.3.04: Plat contents
The submitted plat shows the condominium
name, property boundaries, unit layout,
building footprint, physical common areas,
survey information, legal description,
surveyor certification, and Village approval
block. Revisions are needed to show the
relocated shed and the completed fence
location (see Chapter 94, Accessory
structures and yards).
Substantially compliant, subject to the identified
corrections and final surveyor and staff review.
74.6.13: Condominium
building site
The proposal uses an existing developed
residential site and does not create a new
street or conventional zoning lot.
No apparent conflict
74.6.14(3)-(5):
Easements
Easements associated with condominium
developments must be conveyed by
separate recorded instrument, referenced
on the plat; utility and drainage easements
must meet Village standards.
Confirm all existing and proposed access, utility,
drainage, and shared-service easements; record
separate instruments and reference them on the
final plat.
74.7.02: Public facilities
and services
No new dwelling units or new public
infrastructure are proposed. Existing public
access and utilities serve the developed
site.
No additional capacity concern identified, subject to
Public Works confirmation.
74.8.02-.03: Recording
before permits
The condominium plat and required
documents must be approved and recorded
before permits tied to the condominium
reconfiguration are issued.
Condition of approval
CHAPTER 94 ZONING ORDINANCE REVIEW
Zoning district. The property is zoned 2F Two Family Residential. The 2F District is intended to accommodate
two-family residences, including duplexes and two-flats, and the existing two-family residential use is permitted
in the district. The condominium conversion changes the ownership form but does not change the existing land
use.
Chapter 94 topic Staff analysis
Allowable use A two-family residence is a permitted use in the 2F and MF districts. The condominium
changes ownership form, not the existing two-family land use.
VILLAGE OF WESTON | PLANNING & DEVELOPMENT
Carter Avenue Condominiums | Project No. 20260390 | Staff Report
Density / intensity / bulk
Because no new dwelling unit, principal-building footprint, or exterior building addition is
proposed, the condominium conversion does not create a new density or principal-
building bulk issue. Shed and fence locations are addressed under Accessory
structures and yards.
Site plan review
Single-family detached and two-family residence structures are generally exempt from
site plan approval under Section 94.3.03(10)(a). The condominium review remains
subject to Chapter 74.
Building and site design No exterior construction or remodeling is proposed. Future exterior alterations remain
subject to applicable zoning, building, and condominium approvals.
Parking and access
The plat depicts separate driveways serving each unit. Confirm that the existing
driveway access remains compliant with Chapter 71, Street Access Control, that off-
street parking remains compliant with Chapter 94, and that no exclusive-use
designation interferes with required access.
Accessory structures and yards
The existing 12-foot by 20-foot shed serving 3404 Carter Avenue / Unit 1 was recently
relocated. Residential Accessory Building Permit No. 202601721 was issued for the
shed, with required 6-foot setbacks and site and final inspections. Residential Electrical
Permit No. 202601722 was issued for electrical service to the shed. The final
condominium plat must show the shed’s actual post-relocation location, dimensions,
and setbacks. If the shed is intended for the exclusive use of Unit 1, the Declaration
shall identify and assign the shed or the area containing it as a limited common element
associated with Unit 1 and establish applicable maintenance, repair, replacement, and
cost responsibilities. The fence is being relocated to the west property line, and its final
surveyed location must be shown on the revised plat. Future improvements remain
subject to Chapter 94 and applicable permit requirements regardless of condominium
limited-common-element boundaries.
Nonconforming conditions
Condominium ownership does not legalize an existing zoning nonconformity. Any lawful
nonconforming structure or site remains subject to Article 15. Approval should not be
construed as approving an unidentified zoning violation.
Restrictive covenants
Village enforcement is limited unless a restriction reflects a code requirement or
expressly provides an enforcement role approved by the Village Board. Required
Chapter 74 protections should expressly run in favor of the Village and require Board
consent before amendment.
COMPREHENSIVE PLAN CONSISTENCY
Overall finding: Generally consistent, with no identified land-use conflict, subject to the conditions of
approval. Weston’s current Comprehensive Plan was adopted December 16, 2024. The official plan structure
includes land use, housing, transportation, community facilities and utilities, natural resources, and
implementation. Chapter 74 requires condominium plats to comply with the Comprehensive Plan, and Chapter
94 is intended to implement it through zoning.
Plan consideration Consistency finding
Future land use and neighborhood
character
The property is designated Moderate Density Village Residential on the Future Land
Use Map. The proposal retains an existing two-family residential building and
residential use. It does not introduce a higher-intensity use, additional units, or a new
building form. Staff finds the proposal consistent with this designation.
Housing choice and ownership
opportunity
The condominium creates two separately conveyable ownership interests from an
existing duplex. This expands ownership choice without requiring greenfield
development or adding infrastructure demand.
Efficient use of existing
development and utilities
The project reuses an existing building and established public street and utility
network. No extensions or new municipal facilities are proposed.
Transportation and access Existing access to Carter Avenue is retained. The proposal does not create a new
street, additional dwelling units, or a material traffic increase.
Neighborhood compatibility
The physical development remains unchanged. Clear allocation and maintenance of
common and limited common elements will help preserve appearance, property
condition, drainage, and long-term compatibility.
Implementation / ordinance
consistency
The proposal cannot be found fully consistent until the condominium documents
satisfy the mandatory Chapter 74 protections, particularly escrow funding, voluntary
termination, and Village consent over amendments. These conditions align private
governance with the Village’s long-term land-use and property-maintenance
objectives.
VILLAGE OF WESTON | PLANNING & DEVELOPMENT
Carter Avenue Condominiums | Project No. 20260390 | Staff Report
KEY ISSUES REQUIRING CORRECTION BEFORE RECORDING
• Replace the optional-reserve language with a mandatory escrow/reserve account provision. The documents
should identify the account custodian, permissible uses, required owner contributions, periodic review,
replenishment after expenditures, and a funding approach reasonably related to anticipated common-
element obligations.
• Add a clear voluntary termination provision consistent with Wis. Stat. ch. 703 and requiring prior written
Village Board consent.
• Add a clause stating that the dispute-resolution, escrow/reserve, voluntary termination,
declaration/covenant, easement, maintenance, and Village-enforcement provisions required by Chapter 74
may not be amended, repealed, or terminated without prior written Village Board consent.
• Add a Village certification page to the Declaration for execution by the Village.
• C omplete all blank fields, including the legal description, resident-agent address, association mailing
address, execution dates, and signature/certification information.
• Revise the condominium plat to accurately depict the units, buildings, driveways, patios, exterior
mechanical areas, and physical common elements to the extent required by Wis. Stat. § 703.11. Revise the
Declaration to clearly identify the common and limited common elements, assign limited common elements
to the applicable unit, and establish use, access, maintenance, repair, replacement, and cost
responsibilities. The final plat and Declaration shall be consistent with one another.
• Revise the final condominium plat to show the actual post-relocation location of the 12-foot by 20-foot shed
serving 3404 Carter Avenue / Unit 1, including its dimensions and 6-foot setbacks, and the fence in its final
location along the west property line based on the completed field condition after Countryside Fence
completes the correction. Confirm completion of the required site and final inspections under Residential
Accessory Building Permit No. 202601721 and applicable inspections under Residential Electrical Permit
No. 202601722.
• P repare and record separate easement instruments required by Section 74.6.14(3), and reference the
recording information or instrument on the final plat. Confirm access for shared utilities, drainage, irrigation,
maintenance, repair, and replacement.
• Confirm existing principal-building setbacks, parking, access, utility service, and any lawful nonconforming
conditions before the Village executes the approval certificate.
• C oordinate final Declaration and Bylaws language so the priority, voting, deadlock, payment authority,
maintenance, and enforcement provisions do not conflict.
• Provide final clean copies of the Declaration, Bylaws, articles of incorporation, plat, easement instruments,
and any mortgagee consent for staff review before recording.
RECOMMENDED ACTION
Staff recommends that the Plan Commission recommend and the Village Board conditionally approve
Project No. 20260390, the Carter Avenue Condominium Plat and associated Declaration and Bylaws,
subject to the following conditions:
1. Final approval by the Zoning Administrator, Director of Public Works, and other reviewing departments as
applicable.
2. Revision of the Declaration and Bylaws to fully comply with Section 74.1.04(5), including mandatory escrow
funding, voluntary termination, and Village Board consent before modification or termination of the required
provisions, and addition of a Village certification page to the Declaration for execution by the Village.
3. Revision of the final condominium plat to accurately reflect existing physical conditions, including the actual
location, dimensions, and setbacks of the relocated shed, the fence in its completed location along the west
property line, driveways, parking areas, and the units, buildings, and physical common elements to the
extent required by Wis. Stat. § 703.11. The Declaration shall clearly identify the common and limited
common elements, assign limited common elements to the applicable unit, and establish the associated use,
access, maintenance, repair, replacement, and cost responsibilities. The final plat and Declaration shall be
consistent with one another.
4. Final plat compliance with Wis. Stat. § 703.11 and all practical submittal requirements under Sections
74.3.01 and 74.3.04.
5. Preparation, approval, and recording of all required access, utility, drainage, irrigation, and maintenance
easements by separate instrument, with appropriate references on the condominium plat.
VILLAGE OF WESTON | PLANNING & DEVELOPMENT
Carter Avenue Condominiums | Project No. 20260390 | Staff Report
6. Correction of all drafting blanks and inconsistencies in the Declaration, Bylaws, and plat before execution.
7. Payment of all required fees and reimbursement of Village consultant costs.
8. Recording of the approved condominium plat and all associated documents concurrently with the Marathon
County Register of Deeds, followed by delivery of recorded copies to the Village within 30 days.
9. No representation is made by this approval regarding private title, mortgage priority, tax treatment, building-
code compliance, or enforceability of private provisions not required or approved by the Village.
SUGGESTED MOTION
Motion to recommend conditional approval to the Village Board of Project No. 20260390, the Carter Avenue
Condominium Plat and associated Declaration and Bylaws for 3404 and 3406 Carter Avenue, subject to the
conditions identified in the Planning and Development Department staff report, including final compliance with
Chapters 71, 74, and 94 of the Weston Municipal Code, Wis. Stat. ch. 703, the Village of Weston
Comprehensive Plan, and final review and approval by Village staff.
DOCUMENTS REVIEWED
• Carter Avenue Condominium Plat, prepared by Vreeland Associates, Inc., dated September 14, 2026.
• Declaration of Condominium of Carter Avenue Condominiums.
• Bylaws of Carter Avenue Condominiums Association, Inc.
• Village of Weston Municipal Code, Chapter 71, Street Access Control.
• V illage of Weston Municipal Code, Chapter 74, Subdivision Regulations, amended February 16, 2026.
• Village of Weston Municipal Code, Chapter 94, Zoning Ordinance, last amended November 17, 2025.
• Village of Weston Comprehensive Plan, Volumes 1 and 2, adopted December 16, 2024.
Prepared by: Jennifer Higgins, Director of Planning & Development / Zoning Administrator
Staff Report | November 4, 2026
1
DECLARATION OF CONDOMINIUM
OF
CARTER AVENUE CONDOMINIUMS
John S. Sondelski and Julie A. Mayer (collectively, the “Declarant”) own the real property
described on Exhibit A (the “Land”). Declarant executes this Declaration of Condominium (this
“Declaration”) to create a two-unit residential condominium under Chapter 703 of the
Wisconsin Statutes.
1. CREATION OF CONDOMINIUM
1.1 Submission. Declarant submits the Land; the building and other improvements
located on the Land; and all easements, rights, and appurtenances benefiting
the Land (collectively, the “Property”) to condominium ownership under
Chapter 703 of the Wisconsin Statutes (the “Act”). The condominium created by
this Declaration is known as Carter Avenue Condominiums (the
“Condominium”).
1.2 Effective Date. The Condominium is created when this Declaration and the
condominium plat for the Condominium (the “Condominium Plat”) are
recorded with the Register of Deeds for Marathon County, Wisconsin.
1.3 Address. The addresses of the Condominium are 3404 Carter Avenue and 3406
Carter Avenue, Village of Weston, Wisconsin. Unit 1 has the street address 3404
Carter Avenue, and Unit 2 has the street address 3406 Carter Avenue.
1.4 Small Condominium. The Condominium is a small condominium under the
Act. The Condominium elects to be governed by Wis. Stat. § 703.365(2)(b)
through (e), (3), (4), (5), (7), and (8). The Condominium does not elect to be
governed by Wis. Stat. § 703.365(6).
1.5 Non-Expandable. The Condominium is non-expandable. Declarant does not
reserve a right to add land, units, or other improvements to the Condominium.
1.6 Binding Effect. This Declaration runs with the Land and binds Declarant, the
Association, each Unit Owner, and each person claiming through any of them.
2. LAND, PLAT, AND UNITS
2.1 Land and Plat. The legal description of the Land is attached as Exhibit A. The
Condominium Plat is recorded concurrently with this Declaration and is
incorporated into this Declaration by reference.
2.2 Units. The Condominium consists of Unit 1 and Unit 2 as identified on the
Condominium Plat (each, a “Unit” and together, the “Units”). Each Unit,
2
together with its appurtenant interest in the Common Elements, is separate real
property. “Unit Owner” means the record owner of a Unit and includes a land
contract vendee after the Association receives written notice of the land
contract.
2.3 Unit Boundaries. Unless the Condominium Plat expressly provides otherwise,
each Unit is bounded by the interior unfinished surfaces of its perimeter walls,
floor, and ceiling or, where no structural ceiling separates the Unit from the roof,
the underside of the roof framing. At the wall separating the Units, the Unit
boundary is the surface of the wall facing the Unit. Each boundary plane extends
to its intersection with the other boundary planes. The Condominium Plat
controls the location and configuration of each Unit.
2.4 Parts of a Unit. A Unit includes its interior finishes and nonstructural
components, fixtures, appliances, cabinets, interior doors, utility lines serving
only that Unit from the point at which they branch from a shared system, and
equipment and systems serving only that Unit. Heating, ventilation, air-
conditioning, plumbing, electrical, and similar equipment serving only one Unit
are part of that Unit if located within its boundaries and are Limited Common
Elements appurtenant to that Unit if located outside its boundaries.
2.5 Excluded Components. Foundations, structural framing and other load-
bearing components, the wall separating the Units, roof and roof structure,
exterior wall assemblies, siding, and any utility line, equipment, or system
serving both Units are Common Elements regardless of location. Windows,
exterior doors and frames, garage doors and operating equipment, and other
components assigned to a Unit Owner under Section 6 remain part of the
Common Elements unless the Condominium Plat identifies them as part of a
Unit, but the assigned Unit Owner has the maintenance obligation stated in
Section 6.
2.6 Allocation Rule. If the Condominium Plat and this Declaration do not clearly
allocate a component, a structural component or system serving both Units is a
Common Element, and a nonstructural component serving only one Unit is part
of that Unit or a Limited Common Element appurtenant to that Unit, according
to its location and function.
3. COMMON ELEMENTS AND LIMITED COMMON ELEMENTS
3.1 Common Elements. “Common Elements” means every part of the
Condominium other than the Units. The Common Elements include the Land;
foundations; structural framing; the wall separating the Units; roof and roof
3
structure; exterior wall assemblies and siding; shared utility, drainage, irrigation,
and mechanical systems; and improvements intended to serve both Units. A
portion of the Land designated as a Limited Common Element remains a
Common Element subject to the exclusive-use rights stated in this Declaration
and shown on the Condominium Plat.
3.2 Limited Common Elements.
(a) “Limited Common Elements” means portions of the Common
Elements reserved for the exclusive use of one Unit. The Limited
Common Elements appurtenant to each Unit are those expressly
designated and allocated on the Condominium Plat or in this
Declaration.
(b) Subject to confirmation and designation on the final Condominium Plat:
(1) the driveway serving Unit 1 is a Limited Common Element
appurtenant to Unit 1;
(2) the driveway serving Unit 2 is a Limited Common Element
appurtenant to Unit 2; and
(3) the yard and other exterior areas designated on the
Condominium Plat for the exclusive use of a Unit are Limited
Common Elements appurtenant to that Unit.
(c) A porch, patio, deck, step, walkway, shed, fence, or similar improvement
is not a Limited Common Element unless it is included within or
allocated to a Limited Common Element on the Condominium Plat. A
fixture designed to serve only one Unit and located contiguous to that
Unit is a Limited Common Element appurtenant to that Unit to the extent
provided by the Act. Exterior mechanical equipment serving only one
Unit is a Limited Common Element appurtenant to that Unit.
3.3 Nature of Right. A Limited Common Element remains commonly owned. Its
designation gives the benefited Unit an exclusive right of use, not separate
ownership. No exclusive-use right arises by prior use, convenience,
acquiescence, implication, or the placement of an improvement unless the
Condominium Plat or this Declaration allocates that right to the Unit.
3.4 Reallocation. A Limited Common Element may be reallocated only by a
recorded amendment executed and approved as required by the Act.
4. PERCENTAGE INTERESTS AND VOTES
4
4.1 Percentage Interests. A Unit’s “Percentage Interest” means its percentage
share of ownership in the Common Elements. Each Unit’s Percentage Interest is
50%. A Unit’s Percentage Interest is appurtenant to that Unit and may not be
conveyed, encumbered, or transferred separately from it.
4.2 Votes. Each Unit has one vote. If more than one person owns a Unit, those
persons collectively exercise that Unit’s vote as provided in the Association’s
bylaws, as amended from time to time (the “Bylaws”) and the Act.
5. ASSOCIATION
5.1 Association. The Condominium is administered by the Carter Avenue
Condominiums Association, Inc. (the “Association”), a Wisconsin nonstock
corporation. Each Unit Owner is automatically a member of the Association
while owning a Unit.
5.2 Authority. The Association may administer the Condominium, maintain and
insure the Common Elements, adopt budgets, levy and collect assessments,
contract for services, adopt and enforce rules, enter Units and Limited Common
Elements as authorized by this Declaration, and exercise the powers granted by
the Act, this Declaration, and the Bylaws.
5.3 Board and Bylaws. The Association acts through its board of directors (the
“Board”). The Board’s composition and procedures are governed by the Bylaws
and the small-condominium provisions elected in Section 1.4. For purposes of
Board representation under Wis. Stat. § 703.365(3)(c), an individual designated
by an entity Unit Owner in accordance with the Bylaws is the representative of
that Unit and may serve as the director representing that Unit.
5.4 Rules and Regulations. The Board may adopt reasonable rules and regulations
governing use of the Condominium (the “Rules”). The Rules may regulate day-
to-day conduct but may not reallocate ownership, exclusive-use rights,
maintenance duties, payment obligations, voting rights, or other permanent
rights established by the Act, this Declaration, or the Bylaws.
6. MAINTENANCE, REPAIR, AND REPLACEMENT
6.1 Association Responsibilities. The Association shall maintain, repair, and
replace the Common Elements, except components assigned to a Unit Owner
under Section 6.2. The Association’s responsibilities include foundations;
structural framing; the wall separating the Units; roof and roof structure; exterior
wall assemblies and siding; shared gutters and downspouts; shared drainage
5
facilities; portions of driveways not allocated as Limited Common Elements;
and utility, irrigation, mechanical, and other systems serving both Units.
6.2 Unit Owner Responsibilities. Each Unit Owner shall maintain, repair, and
replace: (i) the Unit; (ii) utility lines, equipment, and systems serving only that
Unit; (iii) the Limited Common Elements appurtenant to that Unit, including any
driveway, yard, porch, patio, deck, step, walkway, shed, fence, or similar area or
improvement allocated to that Unit; (iv) windows and window assemblies
serving that Unit; (v) exterior doors and frames serving that Unit; (vi) garage
doors and operating equipment serving that Unit; and (vii) exterior mechanical
equipment serving only that Unit. A Unit Owner shall keep owner-maintained
exterior components in safe condition and reasonably consistent with the
building’s appearance. A Unit Owner’s responsibility for a yard includes ordinary
mowing, landscaping, weed control, leaf removal, and similar routine care. A
Unit Owner’s responsibility for a driveway, walkway, step, or other exterior
access area includes ordinary snow and ice removal.
6.3 Owner-Caused Damage. A Unit Owner shall pay the cost to clean, maintain,
repair, replace, or restore any part of the Condominium damaged by an act or
omission of that Unit Owner or the Unit Owner’s tenants, occupants, guests,
contractors, or invitees, or by an alteration made for that Unit. Available
insurance proceeds reduce the amount payable by the Unit Owner.
6.4 Failure to Perform. If a Unit Owner fails to perform work required by this
Declaration, either director may give that Unit Owner written notice describing
the failure and allowing at least 10 days to cure. The notice may allow less time
if delay threatens personal safety, property, required insurance, utility service,
or compliance with a governmental order. If the Unit Owner does not timely
cure, the Association may enter the Unit or Limited Common Element as
reasonably necessary, perform the work, and assess against that Unit the cost
of the work and reasonable access, contractor, and administrative costs. The
work must be approved by the Board or otherwise authorized as Emergency
Work or Necessary Protective Work under this Declaration.
6.5 Emergency Work. A director may authorize work without prior Board approval if
delay would create an imminent risk of personal injury or significant property
damage. The director shall notify the other director as soon as practicable and
shall limit the work to what is reasonably necessary to stabilize or address the
emergency. Cost allocation follows Sections 6.1 through 6.3.
6.6 Necessary Protective Work. If the Board does not approve proposed work and
a Unit Owner reasonably believes the work is necessary to protect personal
6
safety, structural integrity, weather resistance, compliance with law, insurance
required by the Act or the Condominium Documents, or continued utility
service, that Unit Owner may use the procedure in this Section. The Unit Owner
shall obtain a written opinion from a contractor, engineer, architect, insurance
professional, or governmental authority qualified for the condition at issue. The
opinion shall identify the condition, explain why work is necessary, and describe
a technically reasonable scope and estimated cost. The Unit Owner shall deliver
the opinion and any proposed contract or estimate to the other Unit Owner. The
other Unit Owner has 10 days after delivery to approve the work or deliver a
contrary written opinion from a person similarly qualified for the condition at
issue. A contrary opinion may propose an alternative and shall explain why the
proposed alternative adequately addresses the condition. If the initiating
opinion identifies a shorter response period reasonably necessary based on the
condition, that shorter period applies, but it must allow a reasonable
opportunity to respond under the circumstances. If the other Unit Owner does
not timely respond, the work described in the initiating opinion is authorized
without further Board action. This Section does not limit authority to perform
Emergency Work under Section 6.5. Work authorized under this Section is
“Necessary Protective Work.”
6.7 Conflicting Opinions. If the qualified opinions conflict, including as to whether
a proposed alternative adequately addresses the condition, the persons who
issued them shall select an independent person qualified for the condition at
issue. If they do not agree within 5 days after delivery of the contrary opinion,
either Unit Owner may ask the presiding judge of the circuit court for the county
where the Condominium is located to appoint the independent person. The
court is requested only to appoint the independent person, not to decide the
underlying matter. The independent person shall determine whether the
condition objectively requires work, the technically reasonable scope and
method, the reasonable estimated cost, and whether a proposed alternative
adequately addresses the condition. That technical determination is binding for
purposes of authorizing the work. It is not arbitration and does not finally
determine negligence, breach, legal causation, insurance coverage, statutory
rights, or ultimate liability. The procedures in Sections 6.6 through 6.9 are
contractual work-authorization procedures and do not constitute an election
under Wis. Stat. § 703.365(6) or an agreement to arbitrate under that
subsection. The Association shall pay the independent person’s cost as a
Common Expense. A party may seek temporary injunctive relief before
7
completion of this process if necessary to prevent personal injury or significant
property damage.
6.8 Limited Agency and Work Limits. For work authorized under Sections 6.6 and
6.7, the initiating Unit Owner is the Association’s limited agent solely to obtain
and administer that work. If the estimated cost exceeds $10,000, the initiating
Unit Owner shall obtain at least 2 reasonably comparable bids unless the
qualified person states that doing so would create unreasonable delay or
comparable contractors are not reasonably available. The initiating Unit Owner
shall select a reasonably qualified contractor on commercially reasonable
terms, considering price, scope, qualifications, availability, warranty, and other
relevant factors. The initiating Unit Owner may execute a contract in the
Association’s name and approve reasonably necessary change orders caused
by unforeseen conditions, but the total authorized cost may not exceed 110% of
the approved estimate without renewed notice under Section 6.6 or approval by
the independent person. Except to the extent separately authorized under the
Condominium Documents, this limited agency does not authorize the initiating
Unit Owner to borrow money, refinance debt, or pledge Association assets. This
limited agency does not itself authorize the initiating Unit Owner to withdraw or
disburse Association funds. Association funds may be disbursed only as
otherwise authorized by the Bylaws. This limited agency does not authorize
unrelated work, discretionary improvements or betterments, or a material
change in design or appearance. The Association and both Unit Owners are
bound only to the extent the contract and change orders comply with this
Section. The initiating Unit Owner shall promptly provide the contract, change
orders, invoices, and payment records to the other Unit Owner.
6.9 Cost of Necessary Protective Work. Necessary Protective Work is
provisionally allocated equally between the Units unless the work concerns a
component assigned to one Unit Owner, exclusively benefits one Unit, or is
required because of an act or omission attributable to one Unit. The initiating
Unit Owner shall deliver an allocation statement applying those rules and may
rely on undisputed facts and the independent person’s technical findings. The
provisional allocation does not finally determine negligence, breach, legal
causation, insurance coverage, or ultimate liability. Each provisionally allocated
share constitutes an assessment without further Board action and is due 15
days after delivery of the applicable invoice and allocation statement. A Unit
Owner may challenge the allocation under applicable law, but the challenge
does not stay the work or payment obligation absent an injunction. A final
8
agreement or judgment shall be implemented through an additional
assessment, credit, or refund.
7. SHARED IRRIGATION SYSTEM
7.1 Shared Irrigation System. The existing irrigation system serving both Units,
including its control panel, supply lines, valves, sprinkler heads, and other
components serving both Units, is a Common Element (the “Shared Irrigation
System”). The Association shall operate, maintain, repair, replace, activate,
and winterize the Shared Irrigation System.
7.2 Access. Each Unit Owner shall provide reasonable access to the Shared
Irrigation System as necessary for its operation, maintenance, repair,
replacement, activation, or winterization. A Unit Owner may not disconnect,
alter, or interfere with the Shared Irrigation System without Board approval.
7.3 Costs.
(a) The costs of operating, maintaining, repairing, replacing, activating, and
winterizing the Shared Irrigation System are Common Expenses
allocated equally between the Units, except for a cost attributable to an
act or omission of one Unit Owner or an alteration made for one Unit.
(b) If water used by the Shared Irrigation System is separately measured, the
related water and sewer charges are Common Expenses allocated
equally between the Units. If the water is supplied through a meter
serving one Unit and is not separately measured, the Association shall
reimburse that Unit Owner for the portion of the charges reasonably
attributable to the Shared Irrigation System. If that amount cannot be
determined from available billing or usage information, the Unit Owners
shall allocate the charges using a reasonable estimate.
7.4 Discontinuance. The Board may discontinue all or part of the Shared Irrigation
System if continued operation is unlawful, physically impracticable, or not
reasonably economical.
8. EASEMENTS AND ENTRY
8.1 General Easements. Each Unit and the Common Elements have reciprocal
easements for support, utilities, drainage, irrigation, access, maintenance,
repair, replacement, and compliance with governmental requirements as
reasonably necessary for their intended use. These easements include
reasonable access to operate, winterize, maintain, repair, and replace the
Shared Irrigation System. This Section does not create rights in property outside
9
the Condominium. Any easement required over neighboring property must be
separately created and recorded.
8.2 Use of Common Elements. Each Unit Owner may use the Common Elements
for their intended purposes without unreasonably interfering with the rights of
the other Unit Owner. Limited Common Elements may be used only by the Unit
to which they are allocated.
8.3 Entry. The Association may enter a Unit or Limited Common Element at
reasonable times on at least 24 hours’ notice to inspect or perform work
authorized by the Condominium Documents, including work involving structural
components, shared utilities, drainage facilities, or the Shared Irrigation
System. No advance notice is required in an emergency, but the Association
shall notify the Unit Owner as soon as practicable. The Association shall
minimize disruption and repair physical damage caused by entry. The
responsible Unit Owner shall reimburse the Association if entry was required
because of that Unit Owner’s failure or responsibility.
8.4 Encroachments. If construction, settlement, shifting, repair, or replacement
causes a part of a Unit or Common Element to encroach on another Unit or the
Common Elements, an easement exists for the encroachment and its
maintenance while the condition exists, unless the encroachment results from
an unauthorized intentional alteration. This Section does not authorize or create
an easement for an improvement that encroaches on property outside the
Condominium.
9. ALTERATIONS
9.1 Interior Alterations. A Unit Owner may alter the interior of the Unit without
approval if the work does not affect structural components, shared systems,
drainage, another Unit, the exterior appearance, or compliance with law.
9.2 Approval Required. A Unit Owner shall obtain Board approval before work
affects a Common Element, structural component, shared utility or mechanical
system, the Shared Irrigation System, drainage pattern, or exterior appearance.
Board approval is not required for maintenance, repair, or replacement required
under Section 6.2 if the work: (i) does not affect a structural component, shared
system, irrigation system, or drainage pattern; (ii) does not materially change
the exterior appearance; and (iii) uses a replacement substantially equivalent in
function and appearance. The Board may require plans, permits, contractor
credentials, and proof of insurance for work requiring approval. The Board may
not unreasonably withhold approval if the proposed work complies with law,
10
does not materially increase shared costs, does not impair the structure or
shared systems, preserves reasonable exterior consistency, and does not
materially interfere with the other Unit. The Unit Owner shall pay any increased
shared cost resulting from the work.
9.3 Responsibility. The Unit Owner performing an alteration shall pay all costs,
repair resulting damage, pay any increased maintenance or repair cost resulting
from the alteration, and cause the property of the Association and the other Unit
Owner to remain free of construction liens arising from the work. Approval does
not transfer maintenance responsibility to the Association.
10. USE AND LEASING
10.1 Residential Use. Each Unit may be used only for residential purposes and
lawful activities incidental to residential occupancy. A home occupation or
business is permitted only if it complies with applicable zoning, licensing, and
other governmental requirements; preserves the residential character of the
property; and does not create unreasonable traffic, noise, odor, parking
demand, or other interference.
10.2 Nuisance and Compliance. No Unit Owner or occupant may use the
Condominium unlawfully or create a nuisance or unreasonable interference
with the use of the other Unit or the Common Elements.
10.3 Leasing.
(a) A Unit Owner may lease the entire Unit under a written lease having an
initial term of at least 12 consecutive months. A lease may not cover less
than the entire Unit. Each lease entered into after this Declaration is
recorded shall require the tenant and occupants to comply with the
Condominium Documents. The Unit Owner remains responsible for their
conduct.
(b) This Section does not require the termination, amendment, or extension
of a lease or tenancy existing when this Declaration is recorded. A new
lease or affirmative renewal entered into after that date must comply
with this Section, except to the extent applicable law requires otherwise.
A month-to-month continuation arising under an existing lease or
applicable law is not a new lease or affirmative renewal.
11. INSURANCE
11.1 Association Insurance. The Association shall maintain property insurance
covering the Common Elements and each Unit as originally constructed against
11
fire and other hazards for not less than the full replacement value of the
property insured. For this purpose, “originally constructed” means the
improvements existing when this Declaration is recorded, excluding personal
property and any improvement, betterment, or upgrade later installed by a Unit
Owner. The coverage shall be written in the Association’s name as trustee for
the Unit Owners according to their Percentage Interests. The Association shall
also maintain liability insurance covering claims commonly insured against
arising from the Common Elements. The Board shall determine other coverage
terms after consultation with a qualified insurance professional.
11.2 Unit Owner Insurance. Each Unit Owner shall maintain property insurance
covering personal property, improvements and upgrades, and property not
covered by the Association’s policy, together with personal liability insurance.
Each Unit Owner shall provide evidence of coverage upon request.
11.3 Premiums and Deductibles. Association insurance premiums and deductibles
are Common Expenses. The Association may assess all or part of a deductible
and any uninsured repair cost against one Unit to the extent the loss results
from an act or omission of that Unit Owner or the Unit Owner’s tenants,
occupants, guests, contractors, or invitees, an alteration made for that Unit, or
a failure to maintain a component assigned to that Unit Owner. Insurance
proceeds reduce the amount assessed, but payment by the Association’s
insurer does not eliminate responsibility otherwise imposed by this Declaration,
subject to Section 10.5 and applicable law and policy terms.
11.4 Claims and Proceeds. The Association shall adjust claims under Association
policies and hold and apply insurance proceeds as trustee. Proceeds shall first
be applied to required repair or reconstruction. A Unit Owner or mortgagee may
receive proceeds only if the Condominium is not rebuilt as permitted by the Act
or a surplus remains after required repair or reconstruction. Insurance proceeds
reduce assessments for the insured work.
11.5 Subrogation. The Association and each Unit Owner waive claims against each
other for property loss only to the extent the loss is actually paid by applicable
property insurance. The waiver does not apply to a deductible, uninsured loss,
intentional misconduct, or breach of an express maintenance obligation. Each
property policy shall include a waiver of subrogation consistent with this Section
to the extent available on commercially reasonable terms.
12. CASUALTY AND CONDEMNATION
12
12.1 Repair. After casualty, the Association shall repair or reconstruct insured
Common Elements and originally constructed Unit components unless repair is
prohibited by law or both Unit Owners elect not to rebuild as permitted by the
Act. Each Unit Owner shall repair portions for which that Unit Owner is
responsible.
12.2 Funding Deficiency. The Association may levy a special assessment to cover a
deficiency between insurance proceeds and the cost of required repair or
reconstruction. The assessment is allocated equally unless this Declaration
assigns the cost to one Unit.
12.3 Decision Not to Rebuild. If the Condominium is damaged to an extent for which
available insurance proceeds are insufficient and both Unit Owners approve in
writing a decision not to repair or reconstruct, the Association and Unit Owners
shall proceed with any partition, removal, sale, or other disposition permitted by
the Act. Net sale proceeds, insurance proceeds, and other funds shall be
distributed according to the Percentage Interests and the priority of interests in
each Unit, as required by the Act.
12.4 Condemnation. A taking or conveyance in lieu of condemnation, restoration of
the property, and allocation of the award are governed by the Act. The
Association shall apply the portion of an award attributable to Common
Elements to restoration when restoration is required by the Act.
13. COMMON EXPENSES AND ASSESSMENTS
13.1 Common Expenses. “Common Expenses” means expenses lawfully incurred
by the Association to administer, maintain, repair, replace, insure, or operate
the Condominium. Common Expenses are allocated equally between the Units
unless this Declaration assigns an expense to one Unit. Common Expenses
include costs of the Shared Irrigation System and water or sewer charges
attributable to that system as provided in Section 6.10. Routine maintenance of
a Limited Common Element is not a Common Expense unless this Declaration
assigns that maintenance to the Association.
13.2 Assessments. The Association may levy regular assessments and special
assessments for Common Expenses. A cost that this Declaration assigns to one
Unit, and each Unit’s share of emergency work or Necessary Protective Work
properly authorized under Sections 6.5 through 6.9, constitutes an assessment
without further Board action. Unless this Declaration states another due date,
such an assessment is due 15 days after the Association or authorized Unit
13
Owner delivers an invoice and allocation statement. No Unit Owner may avoid
an assessment by nonuse, vacancy, or abandonment.
13.3 Payment and Collection. Assessments are due on the date set by the Board or
Bylaws. Delinquent amounts bear interest at the rate stated in the Bylaws, not
exceeding the lawful maximum, and include actual collection costs and
reasonable attorneys’ fees to the extent permitted by law. The Association has
the lien and enforcement rights provided by the Act and may seek a money
judgment without waiving its lien rights.
13.4 Reserves. The Association may maintain reserves for future Common Expenses
but is not required to do so. The Condominium does not elect to be governed by
Wis. Stat. § 703.163. The Declarant or Association may later elect to be
governed by that statute only in the manner provided by the Act.
14. ENFORCEMENT
14.1 Enforcement Rights. Declarant, while owning a Unit; the Association; and any
Unit Owner may enforce the Condominium Documents by injunction, damages,
or any other lawful remedy.
14.2 Notice and Cure. Before filing an enforcement action based on a violation of
the Condominium Documents, the enforcing party shall give written notice
describing the violation and allow 10 days to cure. No notice or cure period is
required for an emergency, a continuing threat to safety or property, a violation
that cannot reasonably be cured, or a request for temporary injunctive relief.
This Section does not apply to the filing of a statement of condominium lien or
an action to collect unpaid assessments or enforce a condominium lien. When
Wis. Stat. § 703.245 applies, a party shall also comply with that statute, and a
notice that contains the information required by both this Section and the
statute may satisfy both requirements. Nothing in this Declaration waives,
modifies, or replaces a notice, negotiation, or other pre-suit procedure required
by applicable law.
14.3 Costs. If the Association or a Unit Owner substantially prevails in an action to
enforce an express obligation under the Condominium Documents, the non-
prevailing party shall pay the prevailing party’s reasonable attorneys’ fees and
costs to the extent permitted by law. This Section does not apply to a good-faith
dispute over a discretionary Board decision.
14.4 Responsibility for Others. A Unit Owner is responsible for violations by the Unit
Owner’s tenants, occupants, guests, contractors, and invitees.
14
15. AMENDMENTS
15.1 General. Except as otherwise provided by the Act, this Declaration may be
amended only with the written consent of both Unit Owners and any other
approval required by the Act. An amendment is effective only when recorded.
15.2 Declarant Amendments and Corrections. Before Declarant conveys the first
Unit, Declarant may amend this Declaration as permitted by the Act. A
correction instrument may be recorded only as permitted by the Act.
16. GENERAL PROVISIONS
16.1 Priority. The Condominium Documents are subject to the Act and shall be
interpreted consistently with one another whenever practicable. If a conflict
cannot be reconciled, the Act controls, followed by this Declaration, the
Condominium Plat, the articles of incorporation, the Bylaws, and the Rules, in
that order. The Condominium Plat controls the physical location, dimensions,
and configuration of the property depicted on it.
16.2 No Partition. No Unit Owner may partition the Common Elements except as
permitted by the Act.
16.3 Notices. Except to the extent applicable law or another provision of the
Condominium Documents requires a different method, recipient, or timing, a
notice under this Declaration must be in writing and delivered personally, by
nationally recognized overnight service, by U.S. mail, or electronically to an
address designated by the recipient. A provision governing a particular notice
controls over this Section. Personal and electronic delivery are effective when
delivered or transmitted, absent a notice of non-delivery. Mail is effective 3 days
after deposit, postage prepaid.
16.4 No Waiver. A failure or delay in enforcement does not waive a later or
continuing violation.
16.5 Severability. If a provision is unenforceable, the remaining provisions remain
effective. The invalid provision shall be enforced to the maximum extent
permitted by law if doing so preserves its essential purpose.
16.6 Governing Law. Wisconsin law governs this Declaration.
16.7 Resident Agent. The resident agent under Wis. Stat. § 703.23 and the
Association’s registered agent is John Sondelski, whose address is [RESIDENT
AGENT ADDRESS]. The Association may change the agent as permitted by law.
15
16.8 Condominium Documents. “Condominium Documents” means this
Declaration, the Condominium Plat, the Association’s articles of incorporation
and Bylaws, and rules validly adopted by the Board.
[SIGNATURE PAGE FOLLOWS]
16
SIGNATURE PAGE
Declarant executes this Declaration on [DATE].
DECLARANT:
________________________________
John S. Sondelski
________________________________
Julie A. Mayer
STATE OF WISCONSIN
COUNTY OF MARATHON
This instrument was acknowledged before me on October ___, 2026 by John S. Sondelski and
Julie A. Mayer.
__________________________________________
Notary Public, State of Wisconsin
My commission: __________________________
17
CONSENT OF MORTGAGEE
CoVantage Credit Union, as the holder of a first mortgage or equivalent security interest in the
Property, executes and consents to this Declaration as required by Wis. Stat. § 703.09(1c) and
agrees that its interest in the Property is subject to this Declaration.
MORTGAGEE:
CoVantage Credit Union
By: ________________________________
Name: ________________________________
Title: ________________________________
STATE OF WISCONSIN
COUNTY OF MARATHON
This instrument was acknowledged before me on October ___, 2026 by [NAME], as [TITLE] of
CoVantage Credit Union.
__________________________________________
Notary Public, State of Wisconsin
My commission: __________________________
A-1
EXHIBIT A
Legal Description
[Insert legal description]
B-1
EXHIBIT B
Condominium Plat
(Attached on next page)
1
BYLAWS
OF
CARTER AVENUE CONDOMINIUMS ASSOCIATION, INC.
These Bylaws govern the administration and operation of Carter Avenue Condominiums, a two-unit
residential condominium created under Chapter 703 of the Wisconsin Statutes.
1. GENERAL PROVISIONS
1.1 Defined Terms. A capitalized term not defined in these Bylaws has the
meaning, if any, assigned to it in the Declaration or the Act. The following terms
have the meanings set forth below:
(a) “Act” means Chapter 703 of the Wisconsin Statutes, as amended.
(b) “Articles” means the Association’s articles of incorporation, as
amended.
(c) “Association” means Carter Avenue Condominiums Association, Inc., a
Wisconsin nonstock corporation.
(d) “Board” means the Association’s board of directors.
(e) “Common Expenses” means expenses lawfully incurred by the
Association to administer, maintain, repair, replace, insure, or operate
the Condominium.
(f) “Common Surplus” means Association funds remaining after payment
of, or provision for, Common Expenses and other Association
obligations.
(g) “Condominium” means Carter Avenue Condominiums, the two-unit
residential condominium created by the Declaration.
(h) “
Condominium Documents” means the Declaration, Condominium Plat,
Articles, these Bylaws, and Rules validly adopted by the Board.
(i) “Condominium Plat” means the condominium plat for the
Condominium recorded with the Register of Deeds for Marathon County,
Wisconsin, as amended.
(j) “Declaration” means the Declaration of Condominium for Carter
Avenue Condominiums, as amended.
(k) “
Emergency Work” means work authorized without prior Board approval
under the emergency-work provisions of the Declaration.
(l) “Necessary Protective Work” means work authorized as Necessary
Protective Work under the Declaration.
2
(m) “Rules” means rules and regulations validly adopted by the Board
governing the day-to-day use and operation of the Condominium.
(n) “Unit Owner” means the record owner of a Unit and includes a land-
contract vendee after the Association receives written notice of the land
contract.
(o) “Unit Representative” has the meaning stated in Section 2.4.
1.2 Association. The Association’s mailing address is [ASSOCIATION MAILING
ADDRESS]. The Board may change the address by notifying each Unit Owner.
1.3 Small Condominium Administration. The Condominium is governed by Wis.
Stat. § 703.365(2)(b) through (e), (3), (4), (5), (7), and (8), as elected in the
Declaration. The Condominium has not elected to be governed by Wis. Stat. §
703.365(6). All aspects of the Association’s management, operation, and duties
are delegated to the Board, subject to the Act, the Declaration, and matters
expressly requiring Unit Owner approval.
1.4 Priority and Construction. The Condominium Documents shall be interpreted
consistently with one another whenever practicable. If a conflict cannot be
reconciled, the Act controls, followed by the Declaration, the Condominium
Plat, the Articles, these Bylaws, and the Rules, in that order. The Condominium
Plat controls the physical location, dimensions, and configuration of the
property depicted on it. These Bylaws supplement rather than duplicate the
Declaration and do not limit authority granted by the Declaration for Emergency
Work or Necessary Protective Work. A reference to a statute includes its
successor provision.
2. UNIT OWNERS AND VOTING
2.1 Membership. Membership in the Association begins when a person becomes a
Unit Owner and automatically terminates when the person ceases to be a Unit
Owner. Membership is appurtenant to the Unit and may not be transferred
separately from it.
2.2 Votes and Required Approval. Each Unit has one vote. An action requiring a
vote of Unit Owners requires the affirmative vote or written consent of at least
75% of the Unit votes, or any greater approval required by the Act or Declaration.
Because the Condominium has two Units, such action requires both Unit votes
unless the Act expressly provides otherwise.
2.3 Multiple Owners of a Unit. If more than one person owns a Unit, the co-owners
shall deliver a written designation of the person authorized to cast the Unit’s
3
vote and select its director. The designation must be signed by all co-owners
and remains effective until the earliest of: (i) replacement by another
designation signed by all co-owners; (ii) a transfer that changes the persons
comprising the Unit Owner; (iii) the designated person’s death, incapacity,
resignation, or loss of authority; or (iv) written revocation signed by all co-
owners. If no designation is effective, a vote or director selection for that Unit is
valid only if all co-owners agree in writing or participate without objection.
2.4 Entity Owners. If a Unit Owner is an entity, the entity shall designate an
individual as its “Unit Representative” by written certificate delivered to the
Association. The certificate shall state that the individual is authorized under the
entity’s governing documents to cast the Unit’s vote, select or replace the Unit’s
director, receive notices, and otherwise act for the entity in Association matters.
The entity remains the Unit Owner. For purposes of Board representation under
Wis. Stat. § 703.365(3)(c), the Unit Representative is the representative of that
Unit and may serve as the director representing that Unit. A replacement
designation is effective when delivered to the Association.
2.5 No Voting Suspension. A Unit Owner’s voting rights may not be suspended
because of delinquency, a recorded condominium lien, or an alleged violation.
3. MEETINGS OF UNIT OWNERS
3.1 Annual Meeting. The Association shall hold an annual meeting during the first
four months of each calendar year. The annual meeting may occur together with
a quarterly Board meeting if the notice and minutes separately identify the
action taken in each capacity.
3.2 Special Meetings. Either director or either Unit Owner may call a special
meeting. The person calling the meeting shall deliver the notice required by
Section 3.3.
3.3 Notice. Notice shall be given at least five days before a meeting in a manner
best calculated to assure actual notice to the owners of both Units. The notice
shall state the date, time, purpose, and location of the meeting or, if remote
participation is permitted, the information necessary to participate remotely.
Notice may be delivered personally, by U.S. mail, nationally recognized
overnight service, or electronically to an address designated by the recipient. A
statutory requirement for a different method, recipient, or timing controls.
3.4 Remote Participation. A Unit Owner may participate by telephone,
videoconference, or another method through which all participants can hear or
4
contemporaneously communicate with each other. Remote participation
constitutes presence.
3.5 Quorum. Owners entitled to cast both Unit votes constitute a quorum. If a
quorum is not present, no action may be taken except adjournment. An
adjourned meeting requires new notice unless both Unit Owners waive notice.
3.6 Presiding Officer; Minutes; Vote Count. The President presides. If the
President is unavailable, the Secretary/Treasurer presides. The
Secretary/Treasurer keeps the minutes and counts votes. If an officer cannot
serve, the participating Unit Owners may appoint another person for the
meeting.
3.7 Written Consent. Any action may be taken without a meeting by written
consent signed by the Unit Owners holding the votes required to approve it. The
consent shall describe the action and be filed with the Association records.
3.8 Waiver of Notice. A Unit Owner may waive notice in writing. Participation
without timely objection also waives notice, except when the participation is
solely to object that the meeting was not lawfully called.
3.9 Statutory Meeting Provisions. Wis. Stat. § 703.15(4)(b) through (d) apply only to
the extent expressly restated in these Bylaws. No proxy is permitted unless both
Unit Owners agree in writing for the particular meeting.
4. BOARD OF DIRECTORS
4.1 Composition. The Board consists of two directors, one representing each Unit.
If one or more individuals own a Unit, the director shall be selected by and from
among the owners of that Unit. If an entity owns a Unit, its Unit Representative
designated under Section 2.4 may serve as the director representing that Unit.
4.2 Selection, Term, and Removal. The owners of each Unit may select or replace
that Unit’s director at any time by written notice complying with Section 2.3 or
2.4. A director serves until the director is replaced, resigns, dies, becomes
incapacitated, or ceases to be qualified. Only the owners of the represented
Unit may remove that director.
4.3 Vacancy or Temporary Inability to Act. A vacancy shall be filled by the owners
of the represented Unit. Until a vacancy is filled, or while the other director is
temporarily unable to act, the available director may preserve Association
property and records, pay previously approved or recurring obligations, comply
with legal filing and notice requirements, administer and collect assessments
that are already due, and authorize Emergency Work under the Declaration. The
5
available director may not take other discretionary Board action requiring both
directors.
4.4 Powers and Duties. The Board has all authority necessary to manage and
operate the Association, including authority to adopt budgets; levy
assessments; maintain, repair, replace, and insure the portions of the
Condominium assigned to the Association under the Declaration; collect
amounts owed; maintain records and bank accounts; contract for goods and
services; adopt and enforce Rules; adjust insurance claims; and exercise
powers granted by the Act, Declaration, Articles, or these Bylaws.
4.5 Board Approval and Quorum. Both directors constitute a quorum. Board action
requires the affirmative vote or written consent of at least 75% of the Board and
therefore requires both directors, except for authority expressly granted to one
director or Unit Owner by the Declaration or these Bylaws. A failure to approve
discretionary action does not expand either director’s authority.
4.6 Quarterly Meetings. The Board shall meet at least quarterly. A meeting may be
brief and may occur together with a Unit Owner meeting if the notice and
minutes distinguish the two capacities. The Board shall review, as applicable,
finances, unpaid assessments, insurance, maintenance, contracts, and
compliance matters.
4.7 Calling and Notice of Board Meetings. Either director may call a Board
meeting. Unless both directors waive notice, at least three days’ notice shall
state the date, time, principal matters expected to be considered, and the
location of the meeting or, if remote participation is permitted, the information
necessary to participate remotely. No notice is required for an emergency
meeting concerning Emergency Work under the Declaration.
4.8 Remote Participation and Written Consent. A director may participate
remotely under Section 3.4. Board action may be taken without a meeting by
written consent signed by the directors whose votes are required. The consent
shall be filed with the minutes.
4.9 Compensation and Reimbursement. Directors serve without compensation
unless both Unit Owners approve otherwise in writing. The Association shall
reimburse reasonable, documented expenses properly incurred on its behalf.
4.10 Manager and Professionals. The Board may retain a manager, accountant,
attorney, insurance professional, contractor, engineer, architect, or other
professional. Retention does not relieve the Board of a duty that applicable law
does not permit it to delegate.
6
4.11 Deadlock. Except for Emergency Work, Necessary Protective Work, ministerial
action under Section 4.3, and other authority expressly granted without further
Board approval, a failure of both directors to approve a matter means the matter
is not approved. No officer, director, or Unit Owner may treat silence, delay, or
deadlock as authorization.
5. OFFICERS
5.1 Officers and Holdover. The officers are a President and a Secretary/Treasurer.
The initial directors shall elect the initial officers at the Association’s
organizational meeting or by written consent. Afterward, the Board elects
officers annually at or after the annual meeting. Each officer continues in office
until a successor is elected or until the officer resigns, is removed, dies,
becomes incapacitated, or ceases to be qualified. A person may hold more than
one office but may not act as both President and Secretary/Treasurer when
executing the same instrument.
5.2 President. The President presides at meetings, coordinates implementation of
approved action, and signs instruments authorized by the Condominium
Documents.
5.3 Secretary/Treasurer. The Secretary/Treasurer maintains minutes, notices,
contracts, insurance and financial records; receives and deposits funds; pays
authorized obligations; prepares or coordinates budgets and reports; and
performs other duties assigned by the Board.
5.4 Removal, Vacancy, and Temporary Inability to Act. The Board may remove an
officer and elect a replacement. Removal from office does not remove the
person as a director. Until an officer vacancy is filled, or while an officer is
temporarily unable to act, the other officer may perform required ministerial
duties but gains no additional discretionary authority.
6. FINANCES, BUDGETS, AND ASSESSMENTS
6.1 Fiscal Year. The fiscal year is the calendar year unless the Board determines
otherwise.
6.2 Annual Budget. The Board shall annually adopt and distribute a budget stating
the information required by the Act, including anticipated Common Expenses,
other anticipated expenditures, funds held for future expenditures, Common
Surpluses, nonassessment income, and proposed assessments.
6.3 Budget Deadlock. If the Board does not adopt a new annual budget before the
start of a fiscal year, the prior year’s regular assessments continue as interim
7
assessments until the Board adopts a new budget. The Board remains obligated
to adopt and distribute the annual budget required by the Act. Continuation of
interim assessments does not constitute adoption of an annual budget,
authorize an increase in assessments, or authorize a new discretionary
expenditure. Nondiscretionary obligations and expenses otherwise authorized
by the Declaration or these Bylaws remain payable.
6.4 Regular Assessments. The Board shall levy regular assessments sufficient to
fund the budget. Unless the Board specifies another schedule, regular
assessments are due in equal quarterly installments on January 1, April 1, July 1,
and October 1.
6.5 Special and Unit-Specific Assessments. The Board may levy special
assessments and assessments against a specific Unit as authorized by the
Declaration and Act. An amount that becomes an assessment without further
Board action under the Declaration may be administered and collected without
further Board approval.
6.6 Application of Payments. Unless applicable law requires otherwise, payments
are applied first to actual collection costs and attorneys’ fees, then interest,
then the oldest unpaid principal assessment. The Association shall provide
reasonable account statements.
6.7 Delinquency and Collection. An unpaid assessment bears interest from its due
date at 12% per year or the highest lawful rate, whichever is less. The
Association may pursue all remedies available under the Act and Declaration.
Either officer may administer and collect an assessment that has been validly
levied or that has become due without further Board action under the
Declaration. The President, Secretary/Treasurer, or an agent authorized by the
Board may sign, verify, file, enforce, and satisfy a statement of condominium
lien for that assessment. Foreclosure and other collection action remain
subject to statutory notices and deadlines.
6.8 Payoff Statements. The President, Secretary/Treasurer, or authorized manager
shall provide payoff and unpaid-assessment statements within the time
required by the Act. The Association may charge only a fee permitted and
established in the manner required by the Act.
6.9 Bank Accounts. Association funds shall be maintained in accounts in the
Association’s name and may not be commingled with a Unit Owner’s funds.
Deposits shall be made promptly. Funds may be invested only in prudent,
readily valued instruments consistent with their intended use.
8
6.10 Payment Authority. Either officer may authorize payment of an obligation
validly incurred under the Declaration, these Bylaws, or prior Board approval,
including a budgeted or recurring obligation and an obligation arising from
Emergency Work or Necessary Protective Work authorized under the
Declaration. No further Board approval is required to pay an invoice for
Emergency Work or Necessary Protective Work if the invoice and supporting
materials required by the Declaration have been delivered. This payment
authority does not authorize entering into a contract, incurring a new obligation,
or making a discretionary expenditure that has not otherwise been approved or
authorized.
6.11 Financial Reports and Common Surplus. At least annually, the
Secretary/Treasurer shall provide each Unit Owner a report showing income,
expenses, account balances, unpaid assessments, and reserves. Common
Surplus shall be credited or used as permitted by the Act and determined by the
Board. No distribution may impair payment of known obligations.
7. CONTRACTS, BORROWING, AND PROPERTY
7.1 Contracts. A contract requires both directors’ approval unless the Declaration
or these Bylaws expressly authorize the contract without further Board action.
Approval of a budget authorizes payment of obligations included in the budget
but does not, by itself, authorize a new contract unless the budget identifies the
contract or service with reasonable specificity. A contract authorized under the
Declaration’s Emergency Work or Necessary Protective Work provisions is valid
as provided there without further Board action.
7.2 Borrowing. The Association may borrow money, refinance debt, grant a security
interest, or pledge Association assets only with both Unit Owners’ written
approval. Nothing in this Section limits an assessment lien or other remedy
arising under the Act or the Condominium Documents.
7.3 Real and Personal Property. The Association may acquire, encumber, or
convey real property, or grant an easement through Common Elements, only
with both Unit Owners’ written approval and any approval required by the Act.
The Board may acquire, replace, or dispose of personal property in the ordinary
course if within an approved budget or otherwise approved by both directors.
7.4 Execution. The President or Secretary/Treasurer may execute an instrument
after the required approval. An instrument affecting real property shall be
executed and recorded as required by law.
9
8. RECORDS AND INFORMATION
8.1 Required Records and Retention. The Association shall maintain the records
required by the Act. Minutes and records of action without a meeting shall be
kept for at least six years. The Declaration, Condominium Plat, Articles, Bylaws,
Rules, and other permanent condominium documents shall be kept
permanently. Financial statements, bank statements, insurance policies,
contracts, invoices, expense records, and other financial records shall be kept
for at least six years, and contract bids shall be kept for at least three years.
8.2 Inspection and Copying. A Unit Owner may inspect and copy records as
provided by the Act. The Unit Owner may select a business day by giving at least
10 business days’ written notice, except when the Act provides a different
procedure. The Association may withhold privileged material, personnel
records, another Unit Owner’s violation or account records, and other records
excluded by law, and may redact account numbers. Copy charges may not
exceed the amount permitted by the Act.
8.3 Electronic Records. Records may be maintained electronically if reproducible
in legible form. Electronic signatures and communications may be used to the
extent permitted by law.
8.4 Owner Roster and Information. The Association shall maintain a current roster
of Unit Owners. Each Unit Owner shall provide a current mailing address and
may designate an electronic address. Each Unit Owner shall promptly report a
change in ownership, authorized representative, tenant contact, and emergency
contact information.
9. INSURANCE ADMINISTRATION
9.1 Policies. The Board shall obtain and administer the insurance required by the
Declaration and Act. Each Unit Owner shall maintain the owner coverage
required by the Declaration and provide evidence upon request.
9.2 Claims. The Board may report and adjust Association claims, retain
professionals, take immediate protective measures as authorized by the
Declaration, and apply proceeds as required by the Declaration and Act. This
authority does not displace authority for Emergency Work or Necessary
Protective Work.
9.3 Coverage Information. The Association shall make current certificates or
summaries of Association coverage reasonably available. Each Unit Owner
10
remains responsible for confirming individual coverage with the owner’s
insurance professional.
10. LEASING AND OCCUPANCY ADMINISTRATION
10.1 Compliance. Leases and tenancies must comply with the Declaration and Act.
Receipt of a lease does not constitute approval or waiver of a violation.
10.2 Documents and Contacts. Before a new tenant occupies a Unit, the Unit
Owner shall provide the tenant with the Condominium Documents as required
by applicable law and shall provide the Association with the tenant’s name,
contact information, occupancy date, and the Unit Owner’s current contact
information. The Association may request a copy of the rental agreement only
when reasonably necessary to verify compliance with the Declaration or
applicable law. The Unit Owner remains responsible for tenants and occupants.
11. RULES, VIOLATIONS, AND FINES
11.1 Rules. The Board may adopt reasonable Rules governing day-to-day use and
operation. Rules may not amend the Declaration; reallocate ownership,
exclusive-use rights, maintenance duties, payment obligations, voting rights, or
other permanent rights; or conflict with the Act, Declaration, Condominium Plat,
Articles, or these Bylaws.
11.2 Notice and Opportunity to Respond. Before imposing a fine, the Association
shall give the responsible Unit Owner written notice describing the alleged
violation and proposed fine and a reasonable opportunity to respond. If a tenant
is involved, the Association shall provide any notice required by law.
11.3 Fines and Other Remedies. The Board may impose reasonable fines under a
schedule adopted in the Rules. A fine requires the approval ordinarily required
for Board action and therefore may not be imposed unilaterally by the other
Unit’s director. A fine is an assessment to the extent permitted by the Act. The
inability to approve a fine does not limit any other remedy available under the
Declaration or law.
11.4 Continuing Violations. A continuing violation may be treated as a separate
violation for each reasonable period stated in the Rules after any cure period,
but aggregate fines must remain reasonable in relation to the violation and
resulting harm.
11.5 Protected Rights. The Association and its Rules shall comply with applicable
federal, state, and local law, including laws protecting lawful flag and political-
sign displays.
11
12. INDEMNIFICATION AND LIABILITY
12.1 Indemnification. The Association shall indemnify directors and officers to the
extent required by Chapter 181 of the Wisconsin Statutes and may provide
additional indemnification to the extent permitted by law. No provision of these
Bylaws requires indemnification for conduct for which indemnification is
prohibited by law.
12.2 Reliance. A director or officer may rely in good faith on Association records and
on information, opinions, reports, or statements from a person reasonably
believed competent in the matter.
12.3 No Personal Liability. A Unit Owner, director, or officer is not personally liable
for an Association obligation solely because of ownership or service, except as
provided by law, the Declaration, these Bylaws, or a separate written
undertaking.
13. AMENDMENTS AND GENERAL PROVISIONS
13.1 Amendments. Except as otherwise provided by the Act, these Bylaws may be
amended by the affirmative vote or written consent of at least 75% of the Unit
votes. Because the Condominium has two Units, an amendment requires both
Unit votes unless the Act expressly provides otherwise. The Association shall
promptly deliver each approved amendment to each Unit Owner.
13.2 Notices. Except when applicable law requires another method, recipient, or
timing, a notice may be delivered personally, by nationally recognized overnight
service, by U.S. mail, or electronically to a designated address. Personal and
electronic delivery are effective when delivered or transmitted absent notice of
nondelivery. Mail is effective three days after deposit, postage prepaid.
13.3 Severability. If a provision is unenforceable, the remaining provisions remain
effective. The invalid provision shall be enforced to the maximum extent
permitted by law if doing so preserves its essential purpose.
13.4 No Waiver. A failure or delay in enforcement does not waive a later or
continuing violation.
13.5 Governing Law. Wisconsin law governs these Bylaws.
12
CERTIFICATION
The undersigned certifies that the Board of Directors adopted these Bylaws effective [DATE],
and that these Bylaws remain in effect as of the date below.
Carter Avenue Condominiums Association, Inc.
___________________________
Name: [SIGNER’S NAME]
Title: President
Dated [SIGNING DATE]
VILLAGE OF WESTON | PLANNING & DEVELOPMENT
Conditional Use Permit Tracking, Compliance Monitoring
& Revocation Review
PLAN COMMISSION DISCUSSION MEMORANDUM
Meeting: November 9, 2026
Prepared by: Jennifer Higgins, Director of Planning & Development / Zoning Administrator
Subject: Proposed CUP tracking improvements, ongoing compliance monitoring, and
review of revocation provisions.
Executive Summary
Following recent requests for improved follow-up, staff proposes a phased approach to
tracking Conditional Use Permit (CUP) conditions so recurring requirements and
unfinished obligations remain visible through completion. Evolve already supports project
checklist reminders, and position-based assignment would place CUP follow-up in the
Zoning Administrator’s workflow to improve continuity during staff transitions.
• Build on work underway: Use the existing follow-up folder, planned annual
reminder letters, GIS coordination with Nate Crowe, and the salt storage shed
inspection program. The first summer inspections are complete; winter inspections
are planned, with twice-yearly inspections intended going forward.
• Track obligations individually: Develop a CUP inventory and condition log linked to
source records and Evolve reminders, identifying responsible positions, deadlines,
review results, and next actions. Begin with known recurring and time-sensitive
obligations while historical records are cataloged.
• Match implementation to capacity: Historical review would use a summer 2027
intern if available, or possible Parker/Webster assistance as workloads permit. Both
startup and ongoing monitoring require staff time; proposed schedules and
reporting remain subject to available capacity.
• Separate tracking from legal action: Use existing enforcement and revocation
authority where applicable. The requested discussion of automatic revocation for
expired insurance documentation is a separate policy question requiring Village
Attorney review before any additional provision is considered.
Requested Commission direction: Support the phased tracking approach, provide
feedback on priorities and proposed oversight, and identify whether staff should return
with attorney-reviewed insurance-related policy options. This memorandum does not
amend existing CUPs, impose new conditions, or determine compliance in an individual
case.
1. Purpose and Background
At the October 12, 2026 Plan Commission meeting, discussion was requested regarding
Conditional Use Permit (CUP) tracking and annual compliance follow-up following the
Tommy’s Car Wash matter. A similar tracking concern was raised at the October 19, 2026
Board meeting. The central question is how the Village can consistently identify upcoming
requirements, follow up when information is missing, and document completion rather
than rely on a complaint or a later project review to bring an item back to staff’s attention.
The Village previously maintained a spreadsheet identifying CUPs and variances and the
purposes for which they were granted. That separate inventory was not maintained
consistently as the department transitioned to EnerGov and later Evolve. Existing permit
and project records remain important sources, but a project record alone does not provide
a complete schedule of future compliance obligations. This proposal restores a usable
inventory while adding condition-level deadlines, assigned follow-up, and documented
verification.
2. Work Underway and Planned
• Follow-up folder established: Staff has started a dedicated folder for CUPs with
known follow-up requirements. This is an initial working collection, not yet a
complete inventory of all CUPs or outstanding conditions.
• Annual reminder letter planned: Staff intends to develop a standard letter for
distribution at the beginning of each year to permit holders with recurring
requirements. Each letter would identify the requirements and deadlines applicable
to that specific CUP .
• GIS coordination underway: Staff is working with Nate Crowe to develop a GIS
layer identifying properties where CUPs have been issued. The layer would help staff
locate approvals and connect property information to the supporting records.
• Historical inventory planned: Staff plans to use a summer 2027 intern to review
past CUP records and catalog them in a database or spreadsheet, subject to intern
availability and project scope. If an intern is not available, Valerie Parker and/or
Audrey Webster could assist with developing the inventory as time and existing
workloads allow. This would be potential assistance, not a commitment of
additional staff capacity. Staff review would be needed before relying on the entries
for compliance determinations.
Salt storage shed inspection program established: The Village developed a salt storage
shed inspection program earlier in 2026. Roman Maguire and Michael Wodalski completed
the first summer inspections during summer 2026 and will conduct another round during
the winter operating months. Going forward, the plan is to inspect the CUP properties
covered by this program twice each year—once during the summer and once during winter
operations.
3. Proposed Tracking Framework
One inventory, with a separate line for each follow-up obligation. A master CUP
inventory would identify the approval and property. A linked condition log would identify
each recurring submittal, expiration date, inspection, or one-time completion requirement.
A single CUP may have several obligations with different due dates; marking the overall
project “complete” should not remove those continuing requirements from monitoring.
• CUP identification: CUP/project number, property address, parcel number(s),
approved use, approval date, amendments, recording information, owner/operator
contact, and location of the controlling documents.
• Condition detail: Exact condition reference, required action or document,
frequency, applicable due date or expiration date, and source used to establish that
date. Unclear requirements would be flagged for review rather than assigned an
assumed deadline.
• Follow-up control: Responsible position and backup coverage, Evolve
project/checklist reference, reminder dates, next action, next follow-up date, and
any response or outside dependency. CUP follow-up reminders would be routed to
the Zoning Administrator position rather than tied solely to an individual employee.
• Verification: Date received, staff reviewer, review result, supporting record location,
date verified, and next recurring due date.
• Separate status fields: Approval history, completeness of the historical record
review, and status of each compliance item. An unknown or unreviewed record
would not be labeled compliant or in violation without verification.
Records and systems: The spreadsheet would serve as the working inventory and follow-
up index, not a replacement for the approved CUP , amendments, recorded documents, or
official project records. Evolve already allows a checklist reminder to be placed within a
project and displayed in the responsible party’s workflow. Reviews are now tied to a
position rather than an individual, allowing CUP follow-up reminders to be assigned to the
Zoning Administrator position and displayed in that position’s workflow. The GIS layer
would identify locations and link to records, but would not by itself certify compliance or
establish permit validity.
Continuity during staff transitions: Based on the department’s current understanding,
the Tommy’s Car Wash follow-up had been assigned to an individual who subsequently left
Village employment, and the item was not reassigned to remaining staff. This points to a
handoff gap rather than an absence of reminder capability. Position-based routing is
intended to address that gap, but periodic workflow review and confirmation of
responsibility during staffing transitions would remain important safeguards.
Existing long-term reminder: An Evolve checklist reminder is already established for the
future expiration of the Eau Claire River Mining operation CUP. This provides an existing
example of using Evolve to retain a long-term follow-up obligation. The applicable approval
documents remain the source for the actual expiration date and whether any renewal
process is available.
4. Annual Compliance and Follow-Up Process
1. Confirm the requirement. Review the approved CUP and amendments, confirm
current contacts, and enter each obligation and its actual deadline. Prioritize known
recurring requirements, insurance expirations, environmental protection conditions,
and approaching completion deadlines.
2. Send the beginning-of-year reminder. Identify the CUP , property, applicable
condition numbers, required documents or actions, individual due dates,
submission instructions, and department contact. The letter would remind the
recipient of existing obligations; it would not create an annual renewal requirement
for every CUP or change an approved deadline.
3. Schedule date-specific follow-up. Place project checklist reminders in Evolve and
assign them to the Zoning Administrator position so they appear in that position’s
workflow. Advance reminders, such as 60 and 30 days before a known expiration or
deadline, are proposed where practical and subject to available staff capacity. A
January letter alone would not address insurance or other obligations that expire
later in the year.
4. Review what is submitted. Save the documents in the official record and verify that
they address the applicable condition. Record receipt separately from acceptance.
Missing or incomplete information would remain open with a dated follow-up.
5. Address overdue items promptly. Flag missed deadlines for Zoning Administrator
review, document contact and the required next action, and determine appropriate
notice or referral under the applicable CUP and procedures. The reminder schedule
would not create an automatic grace period or authorize an extension.
6. Close the occurrence, not the recurring obligation. After staff verification,
document completion of that year’s item and enter the next due date. For one-time
improvements, retain the inspection or other evidence supporting closeout while
continuing to monitor any remaining conditions.
Proposed routine oversight: Subject to available staff capacity, staff proposes a monthly
review of upcoming and overdue CUP items in the Zoning Administrator’s Evolve workflow,
with time-sensitive matters addressed sooner as needed. Open actions would be carried
into department project monitoring and weekly recap reporting with a responsible position,
next action, and due date. This review and reporting schedule is proposed for Commission
discussion, not an established service commitment. Backup coverage, periodic
reconciliation between Evolve reminders and the condition log, and confirmation of
workflow responsibility during staffing transitions would reduce dependence on one
person’s calendar or memory. Permit holders remain responsible for meeting existing
conditions whether or not a reminder is received.
5. Phased Implementation and Historical Review
The following dates are proposed planning targets, not firm commitments. Implementation
scope, review frequency, and reporting expectations would need to be matched to
available staff time and existing department priorities.
PROPOSED
TIMING
DELIVERABLE / CHECKPOINT
November–
December
2026
Establish the inventory and condition-log format; enter known follow-
up CUPs; assign staff ownership and backup; verify deadlines; prepare
the standard reminder letter and initial GIS fields.
January 2027 Send the first annual reminders for identified recurring requirements
and schedule date-specific follow-ups. Do not wait for the historical
inventory to begin monitoring known obligations.
Ongoing in
2027
Review upcoming and overdue items monthly. Add new CUPs and
amendments when approved; verify completion requirements before
closing the development phase; retain continuing conditions in active
monitoring.
Summer 2027,
subject to
staffing
Have an intern catalog historical CUPs and related amendments,
match parcels, identify recurring and unfinished conditions, and flag
missing or unclear records for staff review. If an intern is unavailable,
Parker and/or Webster could assist as workloads permit; the scope
and schedule would depend on available staff time.
Following staff
validation
Reconcile verified entries with GIS and project records; report
inventory progress, unresolved record gaps, and recommended next
steps to the Plan Commission.
The historical review would distinguish original approvals from later amendments and
would not assume that an old CUP remains active, has terminated, or is compliant based
only on a database status. Missing documents, uncertain applicability, and conflicting
records would be referred to staff. The initial priority would be CUPs; rebuilding a separate
variance inventory could follow as capacity allows. Intern assistance would support
research and data entry, not final compliance determinations. The total historical workload
and any additional software or staffing costs have not yet been established.
Staff capacity and ongoing workload: The Director has concerns about the staff time
needed both to develop the inventory and to sustain monitoring alongside current
workloads. Historical research, condition verification, data entry, GIS coordination,
reminder letters, document review, inspections, and follow-up would require initial and
recurring staff time. Intern or staff assistance with inventory creation would not eliminate
the ongoing monitoring responsibility. The program should be phased around known
recurring and time-sensitive obligations, with the broader historical review advancing as
capacity allows. Staff time requirements have not yet been quantified; the scope,
schedule, and reporting expectations may need adjustment or additional resources if the
work cannot be accommodated within current workloads.
6. Policy Questions for Commission Discussion
Reason for this discussion. The October 12, 2026 Plan Commission meeting minutes
reflect a request to discuss an automatic-revocation provision when a required insurance
certificate expires, particularly within the wellhead protection area. That request is the
reason automatic revocation is addressed in this memorandum alongside the proposed
tracking improvements. The discussion below distinguishes existing revocation authority
from any additional provision the Commission may wish to consider; no additional
automatic-revocation provision is being adopted through this memorandum.
Existing enforcement and revocation authority. Section 94.16.06(11), Penalties,
Revocation, or Modification of an Approved Conditional Use Permit, provides that
violations of an approved CUP are subject to Section 94.16.19. For the two-year
development and commencement trigger, it states: “All buildings and other improvements
authorized by the conditional use permit have not been developed, and the conditional use
has not commenced operation, within two years of final site plan approval, unless the
Commission or Committee has extended this period by request of the applicant, based on
reasons beyond the reasonable control of the applicant. ” Automatic revocation also
applies when an initially operational conditional use has been discontinued for more than
one year; the permit holder or operator bears the burden of conclusively demonstrating
operation during that period.
Separately, Section 94.16.06(11) allows the Plan Commission or Extraterritorial Zoning
Committee to revoke or modify a CUP upon determining that the use, operation, and/or
associated improvements do not comply with the chapter, including the criteria in
subsection (8), and/or the approved CUP , including associated plans or conditions. The
Commission, Committee, or Zoning Administrator may commence proceedings. Those
proceedings must follow subsections (5) and (6), with an appeal available under
subsection (7).
Application to compliance tracking. The proposed process would help staff identify
potential noncompliance and bring it forward for review under existing authority. A
workflow reminder or database status is an administrative tracking tool, not a legal
determination of permit status. Staff would review the applicable ordinance provisions and
approval documents, with Village Attorney guidance as appropriate, before communicating
a determination or initiating proceedings. Expiration of an insurance certificate is not
expressly listed as an automatic-revocation trigger in Section 94.16.06(11). Missing
documentation, expired documentation, and a confirmed lapse in required coverage
should be documented distinctly. Staff should review the applicable CUP conditions and
ordinance procedures with the Village Attorney before recommending enforcement action
in an individual case. Any proposed additional automatic-revocation trigger would be a
separate, attorney-reviewed policy question, not a prerequisite to improving tracking or
using existing authority.
• Does the Commission support beginning with known recurring and unfinished CUP
conditions while the broader historical inventory is built?
• Does the Commission support proposed beginning-of-year reminder letters
supplemented by expiration-specific reminders and documented monthly staff
review, with implementation matched to available staff capacity?
• Would a proposed quarterly exception report be useful, identifying items due soon,
overdue items, unresolved documentation, and matters needing Commission
attention, with urgent issues brought forward sooner? Quarterly reporting has not
been adopted and would be subject to available staff capacity.
• Does the Commission support a capacity-based implementation schedule,
recognizing that inventory development and ongoing monitoring require staff time
and that expanded scope or reporting may require reprioritization or additional
resources?
• Should staff return with Village Attorney guidance on applying existing enforcement
and revocation procedures to insurance-related noncompliance and, separately,
any proposed additional automatic-revocation trigger or changes to future CUP
conditions?
7. Staff Recommendation and Suggested Direction
Staff recommends proceeding with the phased tracking improvements described above,
beginning with known obligations rather than waiting for completion of the historical
review, with implementation paced to available staff capacity and existing department
priorities. The goal is a practical process in which each follow-up condition has a clear
source, responsible staff owner, due date, documented review, and next action. GIS and
the historical spreadsheet would improve access to information; consistent follow-up and
verification would provide the compliance control. The implementation update should
identify staff time demands and any adjustments to scope, schedule, or resources needed
to sustain the program.
Suggested direction for discussion: Support staff’s phased development of a CUP
inventory and condition-level tracking process, annual and date-specific reminders, GIS
coordination, and a staff-validated historical review, with scope and timing matched to
available staff capacity; request a proposed implementation update in the first quarter of
2027, subject to available staff capacity, addressing progress, workload, and resource
needs; support bringing potential noncompliance forward for review under existing
authority in Sections 94.16.06(11) and 94.16.19 and the applicable CUP; and request
separate attorney-reviewed options before considering any additional automatic-
revocation trigger or other changes to permit consequences. This discussion would not
amend any existing CUP , impose new conditions, or determine compliance in an individual
case.
VILLAGE OF WESTON, WISCONSIN
AGENDA ITEM COVER SHEET / REQUEST FOR CONSIDERATION
DESCRIPTION: October/November Staff-approved Certified Survey Maps and Site Plans.
FROM: Jennifer Higgins, Director of Planning & Development
Valerie Parker, Planning Technician
FOR REVIEW BY: Plan Commission, 11/09/2026
POLICY QUESTION: Should the PC acknowledge the staff approvals as submitted by the
Department?
ISSUE-IN-BRIEF: October/November Staff-approved Certified Survey Maps and Site Plans.
FISCAL IMPACT: TBD.
GUIDANCE: Director of Planning & Development recommends the PC acknowledge
the report and place on file.
PRIOR REVIEW: No previous public review.
REQUEST: Acknowledge and place on file.
☐ Is there an additional briefer with this agenda item?
☐ Are there additional documents which have been attached to this report?
List of CSM’s and Site Plans Approved by Staff Since the last PC Meeting:
Certified Survey Maps –
None.
Site Plans –
None.
**To view any of the above-approved projects (CSM’s & Site Plans), visit:
https://evolvepublic.infovisionsoftware.com/weston/, under the PROJECT heading, select PROJECT
SEARCH. You can then search any of the above projects by name, address, or date range.**
VILLAGE OF WESTON, WISCONSIN
AGENDA ITEM COVER SHEET / REQUEST FOR CONSIDERATION
DE
SCRIPTION: Report re: October 2026 Building Permits
F
ROM: Roman Maguire, Building Inspector
Travis Meverden, Building Inspector
FO
R REVIEW BY: Plan Commission, 11/09/2026
Board of Trustees, 11/16/2026
P
OLICY QUESTION: Should the PC & BOT acknowledge the October 2026 building
permits issued as submitted by the Department?
I
SSUE-IN-BRIEF: Monthly report from the Planning & Development Department – Building
Inspections Division.
F
ISCAL IMPACT: $ 41,448,033 in permit valuation
$263,173 in permit fees
1,265 total permits issued (1,221 Village, 22 Town, 22 Rothschild)
(YTD as of 10/31/26)
Month of October 2026 Permits Issued.
Village of Weston - 129
Town of Weston - 2
Village of Rothschild - 2
$9,937 received in permit fees.
$1,761,880 in permit valuation
G
UIDANCE: Inspectors recommend the PC & BOT acknowledge the report and place
on file.
P
RIOR REVIEW: No previous public review.
R
EQUEST: Acknowledge and place on file.
☐ Is there an additional briefer with this agenda item?
☒ Are there additional documents which have been attached to this report?
October 2026 Building Permits
Date From 10/01/2026 and Date To 10/31/2026
Permits Issued
Issue DatePermit Address Contractor Permit # ValuationOwner Name FeesParcel IDTemplate Finished
Sq Ft
Project
Sq Ft
Town of Weston
202601611 158871 TOWNLINE
RD, WESTON
10/02/2026082280804209
77
LORI L PROPERTIES LLC $2,000 $85.00Electrical 10 702
202601710 227665 Camp Phillips
Road, WESTON
Bcm/North
Central
Mechanical
10/21/2026082280804309
89
DAVID BALLARD $2,400 $75.00Electrical 10 702
Town of Weston Permits Valuation
Town of Weston Permits Fees
Town of Weston Permits Issued 2
$160
$4,400
Town of Weston Permits Finished SqFt
20 Town of Weston Permits Project SqFt
Village of Rothschild
202601701 1802 Hemlock Avenue,
ROTHSCHILD
Knight Barry
Title - QTax
10/19/2026176280819410
73
CAMERON SKABROUD $15.00Special
Assessment
0 911
202601672 1807 Cedar Creek
Drive, ROTHSCHILD
Avenue Title 10/19/2026176280831110
03
PAUL HOFFMAN $15.00Special
Assessment
0 911
Village of Rothschild Permits Valuation
Village of Rothschild Permits Fees
Village of Rothschild Permits Issued 2
$30
Village of Rothschild Permits Finished SqFt
0 Village of Rothschild Permits Project SqFt
Village of Weston
Date From 10/01/2026 and Date To 10/31/2026
Permits Issued
Issue DatePermit Address Contractor Permit # ValuationOwner Name FeesParcel IDTemplate Finished
Sq Ft
Project
Sq Ft
202601614 5107 Aspen Street,
WESTON
Schultz
Property
Management
LLC
10/02/2026192280817100
30
ATLAS II LLC $500 $0.00Accessory 0 101
202601721 3404 Carter Avenue,
WESTON
10/24/2026192280817400
68
JOHN SONDELSKI $10,000 $64.00Accessory 0 101
202601742 10005 Schofield
Avenue, WESTON
LCC Telecom
Services on
behalf of
T-Mobile
10/28/2026192280824109
92
VIRGIL AND BETTY
KUFAHL IRREVOCABLE
TRUST
$75,000 $200.00Cell Tower 0 220
202601725 3806 Schofield Avenue,
WESTON
PDM
Construction
10/26/2026192280817408
70
3910 SCHOFIELD
AVENUE LLC
$0 $0.00Commercial
Accessory
160 203
202601726 3910 Schofield Avenue,
WESTON
PDM
Construction
10/26/2026192280817408
70
3910 SCHOFIELD
AVENUE LLC
$0 $0.00Commercial
Accessory
160 203
202601727 4002 Schofield Avenue,
WESTON
PDM
Construction
10/26/2026192280817408
70
3910 SCHOFIELD
AVENUE LLC
$0 $0.00Commercial
Accessory
160 203
202601728 4020 Schofield Avenue,
WESTON
PDM
Construction
10/26/2026192280817408
70
3910 SCHOFIELD
AVENUE LLC
$0 $0.00Commercial
Accessory
90 203
202601747 8325 MAPLEFIELD
WAY, WESTON
Double J
Construction
LLC
10/30/2026192280829100
76
BENJAMIN LASKA $20,000 $100.00Deck 0 103
202601637 5602 Rock Rapids
Drive, WESTON
Landart 10/09/2026192280809402
34
THERESA SPRANGER $25,000 $100.00Deck 0 103
202601723 6211 VOLKMAN ST,
WESTON
Backcountry
Investments
LLC
10/25/2026 $5,000 $100.00Deck 0 206
202601733 4234 Howland Avenue,
WESTON
James and
Judith Loula
Irrevocable
Trust
10/26/2026 $2,000 $75.00Driveway 0 111
202601617 7810 Kostuck Lane,
WESTON
Jeremy Voigt
Construction
10/02/2026192280814200
08
RICK CVEYKUS $8,000 $75.00Driveway 0 111
202601624 No Address 10/05/2026082280805109
83
POPLAR RANCH LLC $12,000 $75.00Driveway 0 111
202601635 7810 Kostuck Lane,
WESTON
Jeremy Voigt
Construction
10/09/2026192280814200
08
RICK CVEYKUS $100.00Early Start 0 115
202601745 3600 Community
Center Drive, WESTON
8 PINE INC 10/29/2026192280820100
35
MOUNTAIN BAY
METROPOLITAN POLICE
DEPARTMENT
$0.00Early Start
Commercial
0 215
202601732 6203 Isaiah Street,
WESTON
10/26/2026192280810201
39
GREZENSKI REVOCABLE
TRUST
$500 $75.00Electrical 10 702
Date From 10/01/2026 and Date To 10/31/2026
Permits Issued
Issue DatePermit Address Contractor Permit # ValuationOwner Name FeesParcel IDTemplate Finished
Sq Ft
Project
Sq Ft
202601633 3004 Antelope Drive,
WESTON
10/09/2026192280810202
06
GREGORY WOLKEN $850 $75.00Electrical 500 702
202601702 5402 Zadra Street,
WESTON
10/19/2026192280816309
59
JOSEPH GARDNER $1,000 $75.00Electrical 1,000 702
202601722 3404 Carter Avenue,
WESTON
10/24/2026192280817400
68
JOHN SONDELSKI $1,400 $75.00Electrical 240 702
202601645 6806 Lang Lane,
WESTON
Sillars
Hardscape &
Remodeling
10/13/2026 $2,500 $75.00Electrical 10 702
202601606 4311 Schofield Avenue,
WESTON
Disher Electric
Inc.
10/02/2026192280816309
43
ILLINOIS AVENUE
HOUSING LLC
$2,600 $75.00Electrical 5 702
202601607 4311 Schofield Avenue,
WESTON
Disher Electric
Inc.
10/02/2026192280816309
43
ILLINOIS AVENUE
HOUSING LLC
$2,600 $75.00Electrical 5 702
202601608 4311 Schofield Avenue,
WESTON
Disher Electric
Inc.
10/02/2026192280816309
43
ILLINOIS AVENUE
HOUSING LLC
$2,600 $75.00Electrical 5 702
202601609 4311 Schofield Avenue,
WESTON
Disher Electric
Inc.
10/02/2026192280816309
43
ILLINOIS AVENUE
HOUSING LLC
$2,600 $75.00Electrical 5 702
202601605 4311 Schofield Avenue,
WESTON
Disher Electric
Inc.
10/02/2026192280816309
43
ILLINOIS AVENUE
HOUSING LLC
$13,000 $75.00Electrical 5 702
202601703 6703 Ryan Street,
WESTON
Newton
Electric Corp
10/19/2026192280822109
68
BATES HOLDINGS LLP $1 $504.00Electrical
Comm
8,400 700
202601657 6414 Schofield Avenue,
WESTON
V Star
Services LLC
10/15/2026 $1,100 $200.00Electrical
Comm
10 700
202601604 5815 Alta Verde Street,
WESTON
10/01/2026192280818409
77
VILLAGE OF WESTON $2,000 $0.00Electrical
Comm
600 700
202601663 6215 VOLKMAN ST,
WESTON
10/16/2026192280819209
92
C&C PROPERTY
HOLDING LLC
$13,600 $280.06Electrical
Comm
2,546 700
202601627 4002 Schofield Avenue,
WESTON
SEIFERT
ELECTRIC
INC
10/06/2026192280817408
70
3910 SCHOFIELD
AVENUE LLC
$48,500 $587.62Electrical
Comm
5,342 700
202601714 3002 Hampton Avenue,
WESTON
10/21/2026192280808200
49
MAINENG THAO $75.00Excavation 0 300
202601715 3004 Hampton Avenue,
WESTON
10/21/2026192280808200
49
MAINENG THAO $75.00Excavation 0 300
202601631 5703 MARY LN,
WESTON
Wisconsin
Public Service
10/09/2026192280822201
18
KEVIN TOWLE $75.00Excavation 0 300
202601662 2402 Bloedel Avenue,
WESTON
TDS Telecom 10/16/2026192280818402
51
JOHN SCHLAEFER $75.00Excavation 0 300
202601708 2230 Radtke Avenue,
WESTON
WISCONSIN
PUBLIC
SERVICE
10/20/2026 $75.00Excavation 0 300
Date From 10/01/2026 and Date To 10/31/2026
Permits Issued
Issue DatePermit Address Contractor Permit # ValuationOwner Name FeesParcel IDTemplate Finished
Sq Ft
Project
Sq Ft
202601707 3710 Sternberg
Avenue, WESTON
Wisconsin
Public Service
10/20/2026192280817100
09
STEVEN DUNN $75.00Excavation 0 300
202601709 2405 Schofield Avenue,
WESTON
Pearce
Services
10/20/2026192280818402
50
ABBYBANK $75.00Excavation 0 300
202601717 3600 Community
Center Drive, WESTON
Wisconsin
Public Service
10/23/2026 $0.00Excavation 0 300
202601719 6806 Lang Lane,
WESTON
WISCONSIN
PUBLIC
SERVICE
10/23/2026192280815409
90
JASON SILLARS $75.00Excavation 0 300
202601634 8025 Birch Street,
WESTON
WISCONSIN
PUBLIC
SERVICE
10/09/2026192280829100
31
BIRCHWOOD
HIGHLANDSII LLC
$75.00Excavation 0 300
202601636 2106 Bloedel Avenue,
WESTON
TDS Telecom 10/09/2026192280818402
26
PETER ZASTROW $75.00Excavation 0 300
202601652 7607 Ryan Amy Drive,
WESTON
10/14/2026 $4,067 $40.00Fence 0 108
202601643 2606 Schofield Avenue,
WESTON
Weston Ace
Hardware
10/13/2026192280817309
37
BALSAM LLC $2,000 $100.00Fence
Commercial
0 208
202601621 8103 Weston Avenue,
WESTON
PGA Inc 10/05/2026192280826109
98
CRANE MEADOWS LLC $55,400 $100.00HVAC 0 600
202601616 8000 Commerce Drive,
WESTON
Erv Smith
Services, Inc.
10/02/2026192280823400
12
JIM GREENHECK
ENTERPRISES LLC
$504,000 $100.00HVAC 0 600
202601741 3114 Rudolph Drive,
WESTON
MALBRIT
MECHANICAL
INC.
10/28/2026192280808300
44
JEFFREY WILKE $8,690 $50.00HVAC Res 0 604
202601748 6300 Birch Street,
WESTON
Merrill Sheet
Metal
10/31/2026192280820109
96
MHWI COLONIAL
GARDENS OF WESTON
LLC
$11,642 $50.00HVAC Res 0 604
202601639 5700 Quartz Trail
Road, WESTON
Timber Ridge
Builders LLC.
10/12/2026192280822201
59
TIMBER RIDGE BUILDERS
LLC
$50.00Lateral 0 503
202601640 5706 Quartz Trail
Road, WESTON
Timber Ridge
Builders LLC.
10/12/2026192280822201
60
TIMBER RIDGE BUILDERS
LLC
$50.00Lateral 0 503
202601641 5712 Quartz Trail
Road, WESTON
Timber Ridge
Builders LLC.
10/12/2026192280822201
61
TIMBER RIDGE BUILDERS
LLC
$50.00Lateral 0 503
202601642 5716 Quartz Trail
Road, WESTON
Timber Ridge
Builders LLC.
10/12/2026192280822201
62
TIMBER RIDGE BUILDERS
LLC
$50.00Lateral 0 503
202601632 3509 Ross Avenue,
WESTON
Steve's
Plumbing and
Heating
10/09/2026192280817100
73
TEREK HARTEAU $5,340 $40.00Lateral 0 503
Date From 10/01/2026 and Date To 10/31/2026
Permits Issued
Issue DatePermit Address Contractor Permit # ValuationOwner Name FeesParcel IDTemplate Finished
Sq Ft
Project
Sq Ft
202601736 4504 Cedar Avenue,
WESTON
HUSKI
PLUMBING &
HEATING
10/27/2026192280816309
42
SURVIVOR'S TRUST $600.00Meter 0 506
202601610 6411 VOLKMAN ST,
WESTON
Lauren
Exteriors
10/02/2026192280819209
99
TERRI ZASTROW $1,300 $60.00Minor Home
Improvemen
t
0 901
202601669 5902 Lawndale Street,
WESTON
Lauren
Exteriors
10/18/2026192280818401
87
GARRETT KISLOW $7,000 $60.00Minor Home
Improvemen
t
0 901
202601654 5207 Scott Street,
WESTON
Prestige
Roofing LLC
10/15/2026192280816101
26
PATRICK SCHLOEMER $7,566 $60.00Minor Home
Improvemen
t
0 901
202601670 1811 El Segundo
Avenue, WESTON
Lauren
Exteriors
10/18/2026192280819100
66
EMILY HOWLAND $7,957 $60.00Minor Home
Improvemen
t
0 901
202601622 1421 Everest Avenue,
WESTON
Lauren
Exteriors
10/05/2026192280819200
02
TILLMAN VENTURES LLC $9,150 $60.00Minor Home
Improvemen
t
0 901
202601623 3109 Sandgate Court,
WESTON
Lauren
Exteriors
10/05/2026192280829300
50
MARC LEVY $9,350 $60.00Minor Home
Improvemen
t
0 901
202601730 5502 Scott Street,
WESTON
Prestige
Roofing LLC
10/26/2026192280816400
37
ZACHARIAH WHIPPLE $10,000 $60.00Minor Home
Improvemen
t
0 901
202601661 1728 MONTEREY AVE,
WESTON
Lauren
Exteriors
10/15/2026 $10,250 $60.00Minor Home
Improvemen
t
0 901
202601731 6303 Canoe Street,
WESTON
Prestige
Roofing LLC
10/26/2026192280810202
42
TYLER WIPPERFURTH $12,509 $60.00Minor Home
Improvemen
t
0 901
202601668 9910 Woodland Drive,
WESTON
Lauren
Exteriors
10/18/2026192280833209
91
MARK OLSON $13,956 $60.00Minor Home
Improvemen
t
0 901
202601625 3207 Portage Street,
WESTON
Prestige
Roofing LLC
10/05/2026192280810202
45
DAVID KELL $14,611 $60.00Minor Home
Improvemen
t
0 901
202601628 5308 Gordon Street,
WESTON
BADGER
ROOFING OF
WI
10/07/2026192280817409
62
MARY MARQUARDT $15,000 $60.00Minor Home
Improvemen
t
0 901
Date From 10/01/2026 and Date To 10/31/2026
Permits Issued
Issue DatePermit Address Contractor Permit # ValuationOwner Name FeesParcel IDTemplate Finished
Sq Ft
Project
Sq Ft
202601671 6202 Lawndale Street,
WESTON
Lauren
Exteriors
10/18/2026192280819100
40
PAUL WIRTH $15,083 $60.00Minor Home
Improvemen
t
0 901
202601618 6211 Camp Phillips
Road, WESTON
10/02/2026192280821200
06
SAMUEL RHEINSCHMIDT $17,000 $60.00Minor Home
Improvemen
t
0 901
202601720 5611 Camp Phillips
Road, WESTON
10/23/2026192280816309
87
HUNDER LLC $23,173 $60.00Minor Home
Improvemen
t
0 901
202601712 1811 Laguna Avenue,
WESTON
A RITE
CONSTRUCTI
ON AND
ROOFIN
10/21/2026192280819100
88
JEHN REVOCABLE
TRUST
$24,934 $135.00Minor Home
Improvemen
t
0 901
202601711 6203 Alta Verde Street,
WESTON
A RITE
CONSTRUCTI
ON AND
ROOFIN
10/21/2026192280819100
63
ROBERT PAGEL $25,958 $60.00Minor Home
Improvemen
t
0 901
202601729 6807 TROTZER LN,
WESTON
A RITE
CONSTRUCTI
ON AND
ROOFIN
10/26/2026192280815409
94
DONALD PRICE $27,138 $60.00Minor Home
Improvemen
t
0 901
202601665 5803 Pine Park Street,
WESTON
Brazen
Roofing &
Restoration
LLC
10/16/2026192280818409
71
LAURA SIEBERT $31,000 $60.00Minor Home
Improvemen
t
0 901
202601743 6105 Babl Lane,
WESTON
FEEL GOOD
CARPENTRY
& DESIGN
10/28/2026192280815201
63
MAHM FAMILY LLP $32,000 $60.00Minor Home
Improvemen
t
0 901
202601660 6215 VOLKMAN ST,
WESTON
C&C Services,
LLC
10/15/2026192280819209
92
C&C PROPERTY
HOLDING LLC
$150.00Occupancy 0 750
202601629 7205 Stone Ridge
Drive, WESTON
Bank First,
N.A.
10/07/2026192280820409
61
PEOPLES STATE BANK $150.00Occupancy 0 750
202601718 6002 Saxon Avenue,
WESTON
U.S. Venture
Inc.
10/23/2026192280815309
87
COPPERCRAFT
ENTERPRISES LLC
$150.00Occupancy 0 750
202601615 5107 Aspen Street,
WESTON
HUSKI
PLUMBING &
HEATING
10/02/2026192280817100
30
ATLAS II LLC $6,000 $100.00Plumbing 0 501
202601619 9603 Anastasia Drive,
WESTON
CHARLIES
HARDWARE
10/05/2026192280834209
70
PAUL REIFENRATH $900 $50.00Plumbing 0 502
Date From 10/01/2026 and Date To 10/31/2026
Permits Issued
Issue DatePermit Address Contractor Permit # ValuationOwner Name FeesParcel IDTemplate Finished
Sq Ft
Project
Sq Ft
202601667 6210 Randy Jay Street,
WESTON
Wausau
Plumbing
Plus LLC
10/16/2026192280821200
13
RYAN JAEGER $2,000 $50.00Plumbing 0 502
202601735 5411 VON KANEL ST,
WESTON
Steve's
Plumbing and
Heating
10/27/2026192280816400
22
WAYNE OLSON $10,519 $50.00Plumbing 0 502
202601746 4006 Sternberg
Avenue, WESTON
American
Shower
Company LLc
10/30/2026192280817100
15
DON WEBBER $10,860 $50.00Plumbing 0 502
202601613 5810 Weston Avenue,
WESTON
France
Service, LLC,
DBA France
Sales &
Service, Inc
10/02/2026192280822309
81
ANDREW WALDVOGEL $12,850 $50.00Plumbing 0 502
202601620 4002 Schofield Avenue,
WESTON
Stainless
Specialists Inc
10/05/2026192280817408
70
3910 SCHOFIELD
AVENUE LLC
$38,301 $200.00Plumbing
Com
0 500
202601612 5815 Alta Verde Street,
WESTON
10/02/2026192280818409
77
VILLAGE OF WESTON $128,446 $0.00Pool 0 213
202601734 8956 Hinner Springs
Drive, WESTON
10/27/2026 $17,250 $60.00Pool
Residential
0 113
202601724 4107 OAK TER,
WESTON
10/26/2026192280810301
10
SCOTT KLUGE $50.00Resurface 0 112
202601644 5607 Jamar Street,
WESTON
KK
Investments
10/13/2026K&K Investments $6,600 $100.00Roof
Commercial
1,950 205
202601744 5502 Sternberg
Avenue, WESTON
10/29/2026192280816409
89
RICHARD BENDER
RENTALS LLC
$358,285 $100.00Roof
Commercial
71,657 205
202601664 5503 Schofield Avenue,
WESTON
10/16/2026192280816401
50
T & A HOFFMANN LLC $0 $80.00Sign 0 400
202601653 5605 MESKER ST,
WESTON
Finishing
Touch Signs
10/15/2026192280816409
94
T&A HOFFMANN LLC $3,500 $176.00Sign 0 400
202601651 6205 Alderson Street,
WESTON
Graphic
House, Inc.
10/14/2026192280820209
74
MOUNT OLIVE
LUTHERANCHURCH
$3,544 $125.00Sign 0 400
202601704 6106 Canoe Street,
WESTON
Knight Barry
Title - QTax
10/19/2026 $40.00Special
Assessment
0 910
202601699 8705 Hinner Springs
Drive, WESTON
County Land
and Title Co.
10/19/2026192280829400
27
JONATHON PLISCH $40.00Special
Assessment
0 910
202601691 5707 Hidden River
Court, WESTON
Avenue Title 10/19/2026192280815200
87
KATHY NOET $40.00Special
Assessment
0 910
202601692 4603 Camp Phillips
Road, WESTON
Avenue Title 10/19/2026192280816209
59
RICHARD BENDER
RENTALS LLC
$40.00Special
Assessment
0 910
Date From 10/01/2026 and Date To 10/31/2026
Permits Issued
Issue DatePermit Address Contractor Permit # ValuationOwner Name FeesParcel IDTemplate Finished
Sq Ft
Project
Sq Ft
202601693 3909 Concord Avenue,
WESTON
Avenue Title 10/19/2026192280817109
73
RICHARD BENDER
RENTALS LLC
$40.00Special
Assessment
0 910
202601630 1503 NEUPERT AVE,
WESTON
Knight Barry
Title - QTax
10/07/2026192280818300
90
M F T LLC $40.00Special
Assessment
0 910
202601695 1925 Schofield Avenue,
WESTON
Avenue Title 10/19/2026192280818409
95
THEODORE PYKE $40.00Special
Assessment
0 910
202601700 2403 Country Creek
Lane, WESTON
County Land
and Title Co.
10/19/2026192280832200
95
MARLA DAY $40.00Special
Assessment
0 910
202601694 No Address Avenue Title 10/19/2026 $40.00Special
Assessment
0 910
202601705 5503 Rae James
Street, WESTON
GOWEY
ABSTRACT &
TITLE
COMPANY
INC
10/19/2026192280816301
30
KENNETH MACIAZ $40.00Special
Assessment
0 910
202601626 3903 Pat Street,
WESTON
Knight Barry
Title - QTax
10/05/2026192280810300
19
CHERYL LARSON $40.00Special
Assessment
0 910
202601648 7611 Callon Avenue,
WESTON
RUNKEL
ABSTRACT
10/13/2026192280823209
91
JOHN PRICHARD $40.00Special
Assessment
0 910
202601697 6109 Quentin Street,
WESTON
County Land
and Title Co.
10/19/2026192280810201
21
RAYMOND MATSCHE $40.00Special
Assessment
0 910
202601655 2602 Country Creek
Lane, WESTON
GOWEY
ABSTRACT &
TITLE
COMPANY
INC
10/15/2026192280832201
30
ANTHONY MCINTOSH $40.00Special
Assessment
0 910
202601685 4601 Camp Phillips
Road, WESTON
Avenue Title 10/19/2026192280816209
60
RICHARD BENDER
RENTALS LLC
$40.00Special
Assessment
0 910
202601686 4603 Camp Phillips
Road, WESTON
Avenue Title 10/19/2026192280816209
59
RICHARD BENDER
RENTALS LLC
$40.00Special
Assessment
0 910
202601687 5502 Sternberg
Avenue, WESTON
Avenue Title 10/19/2026192280816409
89
RICHARD BENDER
RENTALS LLC
$40.00Special
Assessment
0 910
202601688 5407 Westfair Avenue,
WESTON
Avenue Title 10/19/2026192280816401
31
RICHARD BENDER
RENTALS LLC
$40.00Special
Assessment
0 910
202601689 5409 Westfair Avenue,
WESTON
Avenue Title 10/19/2026192280816401
32
RICHARD BENDER
RENTALS LLC
$40.00Special
Assessment
0 910
202601706 3304 TAPPE DR,
WESTON
GOWEY
ABSTRACT &
TITLE
COMPANY
INC
10/19/2026192280810202
81
MARK WORTHAM $40.00Special
Assessment
0 910
Date From 10/01/2026 and Date To 10/31/2026
Permits Issued
Issue DatePermit Address Contractor Permit # ValuationOwner Name FeesParcel IDTemplate Finished
Sq Ft
Project
Sq Ft
202601696 6807 North Apache
Lane, WESTON
County Land
and Title Co.
10/19/2026192280815100
55
MARK AND DEBORAH
FREEBERG REVOCABLE
TRUST OF 2023
$40.00Special
Assessment
0 910
202601647 3808 Powers Street,
WESTON
RUNKEL
ABSTRACT
10/13/2026192280810300
08
SCOTT GRUENING $40.00Special
Assessment
0 910
202601698 4906 Quirt Sann Drive,
WESTON
County Land
and Title Co.
10/19/2026192280817200
49
STEPHEN HILL $40.00Special
Assessment
0 910
202601649 5303 Colleen Avenue,
WESTON
RUNKEL
ABSTRACT
10/13/2026192280816100
73
CHRISTOPHER OLSON $40.00Special
Assessment
0 910
202601690 5510 NORMANDY ST,
WESTON
Avenue Title 10/19/2026192280818300
14
DUCLANOT CHARLES $40.00Special
Assessment
0 910
202601675 9407 MEADOW
CREEK LN, WESTON
Avenue Title 10/19/2026192280832201
05
JUSTIN KREUSER $40.00Special
Assessment
0 910
202601676 5108 VON KANEL ST,
WESTON
Avenue Title 10/19/2026192280816200
42
JACKSON JALOWITZ $40.00Special
Assessment
0 910
202601677 3804 Green Pastures
Lane, WESTON
Avenue Title 10/19/2026192280829101
21
TIMBER RIDGE BUILDERS
LLC
$40.00Special
Assessment
0 910
202601674 6109 Babl Lane,
WESTON
Avenue Title 10/19/2026192280815201
61
MARJORIE CARSELLO $40.00Special
Assessment
0 910
202601673 4112 River Bend Road,
WESTON
Avenue Title 10/19/2026192280810301
17
DAVID LOYKO $40.00Special
Assessment
0 910
202601678 5706 Quartz Trail
Road, WESTON
Avenue Title 10/19/2026192280822201
60
TIMBER RIDGE BUILDERS
LLC
$40.00Special
Assessment
0 910
202601679 3812 Green Pastures
Lane, WESTON
Avenue Title 10/19/2026192280829101
22
TIMBER RIDGE BUILDERS
LLC
$40.00Special
Assessment
0 910
202601680 3308 Amanda Drive,
WESTON
Avenue Title 10/19/2026192280810201
73
MARC SACIA $40.00Special
Assessment
0 910
202601681 4611 Holly Avenue,
WESTON
Avenue Title 10/19/2026192280816301
72
RYAN NIEMUTH $40.00Special
Assessment
0 910
202601682 3506 Green Pastures
Lane, WESTON
Avenue Title 10/19/2026192280829100
97
TIMBER RIDGE BUILDERS
LLC
$40.00Special
Assessment
0 910
202601683 3404 Caesars Court,
WESTON
Avenue Title 10/19/2026192280832202
17
THERESA THOMAS $40.00Special
Assessment
0 910
202601684 5705 Gordon Street,
WESTON
Avenue Title 10/19/2026192280817409
55
JEFFREY ROSENOW $40.00Special
Assessment
0 910
202601666 8404 Birch Street,
WESTON
10/16/2026192280829209
94
LAWRENCE ZIMMERMAN $60.00Well
Resinspecti
on
0 312
Date From 10/01/2026 and Date To 10/31/2026
Permits Issued
Issue DatePermit Address Contractor Permit # ValuationOwner Name FeesParcel IDTemplate Finished
Sq Ft
Project
Sq Ft
Village of Weston Permits Valuation
Village of Weston Permits Fees
Village of Weston Permits Issued 129
$9,747
$1,757,480
Village of Weston Permits Finished SqFt
92,860 Village of Weston Permits Project SqFt
133Total Permits Issued
Total Permits Fees
Total Permits Valuation
$9,937
$1,761,880
Total Finished Sq Ft
Total Project Sq Ft 92,880
VILLAGE OF WESTON, MARATHON COUNTY, WISCONSIN
4747 CAMP PHILLIPS ROAD, WESTON, WI 54476
REQUEST FOR CONSIDERATION
VILLAGE OF WESTON
4747 CAMP PHILLIPS ROAD, WESTON, WI 54476
Public Mtg/Date: Plan Commission – November 9, 2025
Description: Acknowledge 2019-2026 Village of Weston Housing
Affordability Report as required by Wisconsin Act 243.
From: Jennifer Higgins, Director of Planning & Development
Audrey Webster, Assistant Planner
Question: Should the Plan Commission Acknowledge the 2019 - 2026
Village of Weston Housing Affordability Reports as prepared
by the NCWRPC & staff and required by Wisconsin Act 243?
Background
In 2018, the Wisconsin State Legislature approved new legislation that requires
villages and cities of 10,000 population or more to provide , prepare and post a
“Housing Affordability Report” to report on development activity and analyze the impact
of their residential development regulations on the cost of developing new housing.
This report must be placed on our website and updated annually per WI state statutes.
We have created a separate webpage on our website for these Housing Affordability
Reports. https://westonwi.gov/954/Housing-Affordability-Report
The original report was completed in 2019 and updated in 2020 & 2021 by the
RPC. Due to short staffing in 2022 & 2023 these updates were missed. Earlier
this year we worked with the RPC to update the Report and put it in a format that
could easily be updat ed by staff each year. This new report completed by the
RPC fills the 2022 through 2026 gap we had and also includes 2019 – 2021 data.
Going forward staff will be able to update this document easily with new data.
Attached Docs: 2026 Village of Weston Housing Affordability Report
Committee
Action:
Fiscal Impact: TBD
Recommendation: Staff recommends acknowledgement.
Recommended Language for Official Action
VILLAGE OF WESTON, MARATHON COUNTY, WISCONSIN
4747 CAMP PHILLIPS ROAD, WESTON, WI 54476
REQUEST FOR CONSIDERATION
VILLAGE OF WESTON
4747 CAMP PHILLIPS ROAD, WESTON, WI 54476
I move to acknowledge the 2026 Village of Weston Housing Affordability Report
as presented by staff.
Additional action: Acknowledgment by BOT at 11/16/2026 meeting
Post on Village Website (Staff) - completed
To: Plan Commission
From: Jennifer Higgins, Director of Planning & Development/Zoning Administrator
Date: November 4, 2026
Re: Planning & Development Project Updates
COMMUNITY & LONG RANGE PLANNING
Comprehensive Plan Update
The Comprehensive Plan Update continues with MDRoffers Consulting. The young-adult
questionnaire closed September 18. At the September 28 joint Village Board and Plan
Commission Steering Committee meeting, participants reviewed stakeholder and
intergovernmental interview results, young-adult questionnaire findings, alternative vision
statements, preliminary goals and initiatives, and priorities for the updated Vision &
Directions volume. The initial 2026 community survey received 681 responses. Steering
Committee homework results showed strong support for the alternative draft vision
statement. MDRoffers Consulting has provided a draft workshop presentation and
annotated agenda, and staff is reviewing refinements to the Community Development
Concept Map. The “Shaping Weston’s Tomorrow” public workshop will be held November
12, 2026, from 5:00– 7:00 p.m. to present the draft vision, goals, and initiatives for each
plan element and gather public input.
Housing Affordability Report
Audrey Webster is finishing compiling the Housing Affordability Report, and staff is waiting
on an updated map from Nate Crowe to complete the document. The report will be
presented to the Plan Commission for acknowledgement at the November 9 meeting and
is expected to be posted on the Village website later this week.
Housing & Planning Education
I attended the Wisconsin Chapter of the American Planning Association Annual
Conference on October 8 and 9. Sessions addressed sign ordinance modernization, data
centers, renewable energy, housing strategy, zoning for fiscal health, and youth
engagement. Staff recaps were prepared to support potential follow -up on Village policy
and the Chapter 94 update.
DEPARTMENT INITIATIVES
Commercial Building Inspection Program
The Department continues preparing to provide commercial building inspection services
in-house, including required certification and implementation steps. Additional updates
will be provided as specific certifications, implementation timing, and any remaining
staffing, ordinance, contract, or State approval requirements are confirmed.
Zoning Ordinance Update
Staff continues a comprehensive review of Chapter 94 to improve clarity, eliminate
outdated provisions, and simplify administration while maintaining the intent of the
regulations. Several ordinance amendments are currently being drafted and are
anticipated to come before the Plan Commission in the coming months as individual
sections are prepared for review.
Department Process Improvements
Staff continued Evolve implementation and user -account setup; developed and refined
standard operating procedures; improved packet-readiness and delegated-task tracking;
established a more formal Development Review Team agenda and follow -up process;
completed the Bluebeam approval/stamp SOP; and continued work on standardized
public-hearing posting procedures, future posting locations, and certificate- report fields
within Evolve. In October, staff also prepared a phased CUP tracking and compliance-
monitoring proposal for Plan Commission discussion; moved toward position- based
Evolve reminders and review routing; removed inactive Evolve users and reassigned
Private Well and Utility Special Assessment reviews to active staff; corrected CSM upload
requirements and restored GIS/address project display; developed a Community Living
Arrangement application, staff -review checklist, and supporting GIS layer; and began
developing the 2027 planning and zoning fee schedule.
ZONING & LAND USE REVIEWS
CUP Compliance Follow-Up – USSAM, 3107 Concord Avenue
At its September 14 meeting, the Plan Commission directed Staff to bring the CUP
compliance matter back for a public hearing and further review. Because the original CUP
site plan does not contain sufficient dimensions to objectively establish the location of the
approved green-space area in relation to the southern property line, Staff requested on
September 15 that USSAM provide an updated site plan or boundary/improvement
survey by October 5. The certified letter transmitting this request was refused on
September 18 and returned to the Village. However, the request was also sent by email,
and the owner responded to that email, confirming he was notified of the request. In his
September 23 response, the owner reported that the surveyor had marked the property
corner pins and expected to finalize the work within a few days. On October 12, USSAM’s
attorney, Sean Griffin of West & Dunn, advised that his office was preparing a submission
that may help resolve the matter. As of the preparation of this report, the Village has not
received the survey, site plan, or the submission referenced by counsel. On November 2,
Staff requested a status update from the owner and an anticipated submission date; no
response had been received at the time this report was prepared. The public hearing has
not been scheduled pending receipt of the requested information.
Direction Requested: Based on the September correspondence, the survey work was
expected to be completed approximately one month ago. Staff requests direction from
the Plan Commission on how to proceed if the requested information is not received within
the next few weeks. Options include (1) establishing a firm submission deadline, after
which Staff would schedule the public hearing for the next available meeting using the
information currently available; (2) directing Staff to proceed with scheduling the public
hearing now; or (3) continuing to allow additional time for the survey and submission to
be completed.
CUP Compliance Follow-Up – Tommy’s Express
Staff continues to work with the property owner/operator to address the outstanding CUP
compliance requirements. On September 23, Tommy’s Express provided pumping and
service records from its septic providers, along with video of the tank walls taken following
the September 22 pumping. The operator also committed to generating inspection reports
each time the tanks are pumped and providing video annually goi ng forward. After
reviewing the footage, the Director of Public Works requested additional footage showing
the entire interior of the underground sediment tanks, including the bottom of the
tanks, with the tanks empty during the inspection. On October 28, the operator advised
that its septic contractor is out of the area until early November and is scheduled to re-
pump the tanks and obtain the requested footage on November 8 or 9. Staff anticipates
receiving the updated tank inspection documentation early the week of November 9.
The required Certificate of Environmental Insurance providing $1,000,000 in
environmental coverage has been received, and environmental policy information was
provided on October 21. Staff will track the certificate for renewal.
If the updated inspection documentation is received before the meeting, Staff will provide
the Plan Commission with a verbal update. Otherwise, Staff will review the documentation
with the Director of Public Works upon receipt and report the results at a future meeting.
Current Intake and Technical Reviews
Current intake and technical review work includes the Jahnke/Stromberg CSM at
3704/3706 River Meadow Drive, which was returned to the applicant on October 21 for
missing information and an unpermitted accessory structure; the 3210 Norma Avenue
CSM concept; the Dombrowski/Hoffman CSM (Project 20260056), which was reopened
after it was not recorded within six months of its March 31 approval; revised Coca-Cola
sign materials for 7707 Schofield Avenue; the Cecil Street vacation inquiry, for which a
preliminary surveyor sketch was reviewed at the October 29 Development Review
Team meeting; the Brecke accessory dwelling unit review; and a Town zoning map
amendment that went to Marathon County ERC review on November 3. Staff is
completing past project completeness reviews, written determinations, and
interdepartmental routing as applicable.
DEVELOPMENT REVIEW & FUTURE PROJECTS
Prospective Retail Redevelopment – 1919 Schofield Avenue
Staff continues to coordinate with Village Administration, Public Works, and a prospective
developer regarding the potential retail redevelopment of 1919 Schofield Avenue. A pre-
application meeting with Village staff is scheduled for November 5 to review the concept,
project timeline, and approval process. No formal development application has been
submitted.
Retail Big-Box Development – STH 29 / County Road X Interchange Area
Staff met with a local developer in late summer regarding a potential retail big- box
development in the southeast quadrant of the STH 29/County Road X interchange area.
The discussion was preliminary and focused on the potential development concept and
applicable planning and zoning considerations. The developer has since acquired
additional property adjacent to the site to the east . In October, the Village received a
special assessment request associated with the anticipated sale of that property. Staff
anticipates receiving a preliminary development layout. No formal application has been
submitted.
Manufactured Home Community Expansion Inquiry
In August, the owner of an existing manufactured home community inquired about
removing existing storage units within the community and creating three additional
manufactured home sites. Under Chapter 94, adding sites is considered an expansion of
an existing Manufactured Home Community and requires site plan approval, including
delineated sites of at least 5,000 square feet and 50 feet in width and compliance with
the performance standards in Section 94.4.02(4). Staff provided the owner with the review
process and met with the owner's representatives at a pre-application meeting on August
17. Approval from the Wisconsin Department of Safety and Professional Services (DSPS)
will also be required before the Village issues building permits for any new sites. N o site
plan or formal application has been submitted.
Future Data Center Regulations
Staff has begun preliminary research into zoning regulations and development standards
applicable to large- scale data centers , including potential land-use, infrastructure,
environmental, and community impacts. The topic was also discussed at one of the
Comprehensive Plan Steering Committee meetings. Staff completed a municipal survey
on data center planning earlier this week for Marathon County Land Cons ervation
Planning & Zoning as they are looking at a county-wide ordinance and identified the need
for future coordination with the Town within the extraterritorial zoning area. The draft
Comprehensive Plan economic development initiatives propose supporting industrial
growth while restricting hyperscale data center projects.
On October 8, I attended the APA -WI Annual Conference session “From Dairyland to
Dataland: Zoning Considerations and Plan Review for Data Centers.” The central
recommendation was to define data centers as a land use but regulate their impacts
through objective, measurable standards rather than creating a separate zoning district
or relying on project-specific conditions. Impacts highlighted for local regulation included
noise (particularly low-frequency noise), lighting, heat generation, stormwater, impervious
surface, screening and landscaping, utility and infrastructure demand, and constructi on-
related community impacts. Presenters stressed that standards should be enforceable
through property-line measurements, approved site plans, agency records, or required
applicant reports, with clearly specified measurement methods. The session also
recommended building administrative flexibility into the code, such as alternative
compliance and limited administrative adjustments, so that variances are reserved for
true hardship cases. These lessons will inform staff’s ongoing Chapter 94 review of
industrial districts and performance standards. No formal policy recommendation has
been advanced. Any future ordinance proposal would be presented to the Plan
Commission and Village Board through the normal review process.
MAJOR DEVELOPMENT PROJECTS
COMMERCIAL DEVELOPMENT
Project Status
U.S. Venture –
6002 Saxon
Avenue
The Plan Commission approved the CUP on October 12, removing
Condition 6 and adding a condition addressing tracked dirt and
debris. An occupancy inspection on October 20 identified corrections
that must be completed before the zoning permit is issued. The
executed CUP has been recorded at Marathon County Register of
Deeds.
Fabick CAT –
9601 Christie Ln
Corrections Outstanding: A site inspection was completed
October 1. Outstanding items include accessible parking signposts
and an updated photometric plan.
Weston Mini-Maxi
Storage Two buildings remain under construction.
C-Tech
(Technology Dr.)
Corrections Outstanding: A site inspection was completed
October 1. Outstanding items include completion of the exterior
façade, accessible parking spaces, and the building address.
C-Tech
(Commerce Dr.)
Under Construction: A 42,500-square-foot showroom is under
construction. They are no requesting some modifications to the site
plan for driveways and refuse and recycling enclosures which will
result in a site plan amendment and additional staff time on review.
Project Status
Wausau Supply Final completion inspection pending.
Norcon Outstanding site improvements remain before project close-out.
Brokaw Credit
Union
Exterior remodel and addition under construction. The updated
lighting plan has been received and confirmed.
Badgerland
Industries Building addition under construction.
Beyond the Office
Door
Corrections Outstanding: A site inspection was completed
October 1. Several required street trees and an accessible parking
signpost remain outstanding.
TA Hoffman
Warehouse Suites
Corrections Outstanding: A site inspection was completed
October 1. Outstanding items include required street trees and
fencing for the refuse and recycling enclosure.
BUG Properties
The Plan Commission approved the CUP amendment on October
12. All non -concrete site improvements must be completed by
November 30, 2026, and concrete improvements by September 30,
2027. Staff will verify completion of the November 30 items. Building
and trade-permit corrections are being administered separately. The
amended CUP has been recorded with Marathon County Register of
Deeds.
Central Wisconsin
Powersports Final project completion inspection needed.
Kwik Trip Construction nearing completion. Final project completion inspection
needed.
Mountain Bay
Metro Police
Department
Groundbreaking occurred September 10. Staff is awaiting a revised
site plan. Crossings of the TC Energy/ANR pipeline easement have
not yet been resolved, so the parking lot layout may still need
adjustment. The building location will not change and meets
requirements, so the conditional early-start permit for footings and
foundation was issued the last week of October. Staff will bring the
final site plan to the Plan Commission for approval once it is ready.
No timeline has been established.
Hardwood
Flooring by RJB Building addition under construction.
Precision Body &
Frame Building addition under construction.
Tesla
Supercharger Awaiting revised plans from applicant.
Project Status
Camp Phillips
Condominium
Signed documents were released. Staff is awaiting the recorded plat
and condo documents to close the project.
RESIDENTIAL DEVELOPMENT
Project Status
Green Tree Acres
The Phase 3 letter of credit was received October 6. Phase 3 building
permits may now be issued. Homes remain under construction in
Phases 1 and 2.
Granite Ridge
The final plat has been recorded, and Phase 1 infrastructure is
complete. Initial building permits have been submitted and may now
be issued following receipt of the Phase 1 letter-of-credit security on
September 24.
Bull Junior View
The amended final plat was approved, released for signatures, and
recorded September 29. A copy of the recorded plat has been
received for the project file. The Dev eloper has since identified a
street-name error on the plat (Alexandra Drive should read
Alexandria Drive). An Affidavit of Correction has been recorded at
Marathon County Register of Deeds and the County is working to
update in GIS.
Hinner Springs
Second Addition
Homes under construction. The small street extension has not begun
and we are still waiting for the Development Agreement to be signed
for the project.
RECENTLY COMPLETED/CLOSED PROJECTS
The following projects have recently reached completion or are no longer active
development projects and therefore will be removed from the recurring project list as
appropriate:
• Burger King – Final site inspection completed; Certificates of Occupancy and Site
Completion issued. The project is complete.
• Dombeck CSM (ETZ – Ringle) – Signed and recorded October 6. Project closed.
• 3836 Muskie Drive (Project 20260013) – Occupancy surcharge released October
26. Project closed.
• Turf MDs, 5605 Mesker Street – Special exception sign permit recommended by
the Plan Commission October 12.
• 6215 Volkman Street – Zoning permit and determination issued October 15. The
project is now monitoring only.
UPCOMING DEPARTMENT WORK
• Complete November 9 Plan Commission follow -up and December packet
preparation.
• Hold the November 12 Comprehensive Plan public workshop and compile
participant input.
• Bring 2027 fee schedule updates to Finance/HR and Board for approval.
• Verify completion of the BUG Properties site improvements due November 30.
• Begin Phase 1 of CUP tracking (inventory and condition log), subject to Plan
Commission direction.
• Follow up on recording of the Dombrowski/Hoffman CSM.
• Meverden and Webster to complete outstanding pre- 2025 project closeouts and
follow-up letters.
• Continue Evolve workflow, reporting, and SOP improvements.
• Follow up on public-hearing posting locations and website-posting procedures.
• Potential manufactured-home community expansion, if filed.
• Potential Camp Phillips Road/Weston Avenue development proposals, if filed.
• Complete the 2027 Department Work Plan and 2026 performance- review and
goal-setting work.
UPCOMING PLAN COMMISSION WORK
Staff anticipates bringing the following items before the Plan Commission during the
coming months:
• Continued Comprehensive Plan work, including results of the November 12 public
workshop and joint committee review of the draft Vision & Directions volume this
winter.
• USSAM CUP public hearing after receipt and staff review of the completed survey
and site plan.
• Mountain Bay Metro Police Department final site plan approval once the revised
site plan is received; no timeline has been established.
• 3210 Norma Avenue CSM, if filed.
• CUP tracking and compliance- monitoring follow-up, based on Plan Commission
direction.
• Chapter 94 Zoning Ordinance amendments as individual sections are prepared for
review.
• Cecil Street vacation request, if filed.
• Additional commercial, residential, CSM, CUP, and special-exception applications
received through the normal review process.
2027 Schedule of the
Village of Weston Plan Commission (PC) and
Joint Town & Village of Weston Extraterritorial Zoning (ETZ) Committee
*ETZ Committee meets as needed, on the below dates and times.
Meeting Date
(6:00 p.m.)
Hearing Notice
Publication Deadline
January 11, 2027 December 23, 2026
February 8, 2027 January 21, 2027
March 8, 2027 February 18, 2027
April 12, 2027 March 25, 2027
May 10, 2027 April 22, 2027
June 14, 2027 May 27, 2027
July 12, 2027 June 24, 2027
August 9, 2027 July 22, 2027
September 13, 2027 August 26, 2027
October 11, 2027 September 23, 2027
November 8, 2027 October 21, 2027
December 13, 2027 November 24, 2027
Shaping Weston’s Tomorrow Community Workshop
Village of Weston Municipal Center
November 12, 2026 5:00PM - 7:00PM
Please join us for an interactive
Community Workshop to help
shape the future of the Village.
This is an opportunity to discuss
what you value most about our
community, identify challenges
and opportunities, and help
create a shared vision for the
future.
Source: Village of Weston website. First collected Nov 9, 2026.