VILLAGE OF WESTON, MARATHON COUNTY, WISCONSIN
OFFICIAL MEETING AGENDA OF THE PUBLIC WORKS & UTILITY COMMITTEE
Public Works & Utility Meeting – Agenda 11/9/26
Prepared by: Michael Wodalski, Public Works Director
The following items were listed on the agenda in the Village Clerk’s Office, in accordance with Chapter
2 of the Village’s Municipal Code and will be ready for your consideration at the next regular meeting of
the Public Works Committee which has been scheduled for MONDAY, November 9, 2026, @ 4:30 P.M.,
in the Board Room, at the Weston Municipal Center 4747 Camp Phillips Rd.
Wisconsin State Statutes require all agendas for Committee, Commission, or Board meetings be posted
in final form, 24 hours prior to the meeting. Any posted agenda is subject to change up until 24 hours
prior to the date and time of the meeting.
Join Zoom Meeting by Computer Join Meeting by Phone:
https://zoom.us/j/5445915099 +1 312 626 6799
Meeting ID: 544 591 5099
AGENDA ITEMS
1. Meeting called to order by Public Works & Utility Committee Chair Zeyghami
2. Pledge of Allegiance to the Flag
3. Welcome, introductions and acknowledgement of guests.
4. Roll Call by Recording Secretary
- Public Works Committee: Hooshang Zeyghami {C}, Luis Lopes-Serrao
{VC}, Tom Hubbard, Roy Mumper, Joe Jordan
5. PUBLIC COMMENTS
MINUTES AND ACKNOWLEDGEMENTS
6. Approval of 10/12/26 Public Works & Utility Committee Minutes
7. Acknowledge October 2026 Water and Sewer Permits
PRESENTATIONS
8. In-Pipe I & I Study Presentation
STAFF REPORTS
9. CIP Update
10. Street Operations Update
A quorum of members from other Village governmental bodies (boards, commissions, and committees)
might attend the above-noticed meeting to gather information. Should a quorum of other government bodies
be present at this meeting it would constitute a meeting pursuant to State ex rel. Badke v. Greendale Village
Bd., 173 Wis.2d 553,494 N.W.2d 408 (1993). No official actions other than those of the Public Works
Committee shall take place.
VILLAGE OF WESTON, MARATHON COUNTY, WISCONSIN
OFFICIAL MEETING AGENDA OF THE PUBLIC WORKS & UTILITY COMMITTEE
Public Works & Utility Meeting – Agenda 11/9/26
Prepared by: Michael Wodalski, Public Works Director
11. Utility Operations Update
POLICY DISCUSSIONS AND RECOMMENDATIONS
12. 2027 Sanitary Sewer Rate Options
13. Sidewalk Snow Removal Policy
14. CR-X and Sternberg Ave Pedestrian Design Contract
15. Draft BUS 51 Storm Pond Construction Intergovernmental Agreement
16. Draft Ross Ave – River Bend to Pauls – Intergovernmental Agreement
FUTURE ITEMS
17. Next meeting date(s):
a) Monday, December 14, 2026 @ 4:30 p.m. Regular Meeting
b) Monday, January 11, 2026 @ 4:30 p.m. Regular Meeting
18. Topics for future meetings
a) Watermain Replacement
19. Remarks from Staff
20. Remarks from Committee members.
21. Announcements.
ADJOURNMENT
Valerie Parker updated @ 10/14/2026 1:39 PM Page 1 Mtg_BOT_261019_Consent_Minutes_PW261012W261012
Village of Weston, Wisconsin
OFFICIAL PROCEEDINGS OF THE VILLAGE PUBLIC WORKS & UTILITY COMMITTEE MEETING
held on Monday, October 12, 2026, at 4:30 p.m., in the Board Room, at 4747 Camp Phillips Road
AGENDA ITEMS
1. Meeting called to order by Public Works & Utility Committee Chair and Village Trustee Hooshang Zeyghami at
4:30 p.m.
2. Pledge of Allegiance to the Flag
3. Welcome, introductions and acknowledgement of guests
4. Roll Call of Village Public Works & Utility Committee (PW) by Secretary Parker.
Roll call indicated 4 PW members present.
Member Present
Zeyghami, Hooshang {Chair} YES
Lopes-Serrao, Luis {Vice Chair} YES
Hubbard, Tom EXCUSED
Jordan, Joe YES
Mumper, Roy YES
Village Staff in attendance, in-person: Gebert, Wodalski, Maguire, Swenson, Blarek, Dolan, and Parker
Village Staff in attendance, via Zoom: Clayton Huerth
Other Village Representatives in attendance, in-person: None.
Other Village Representatives in attendance, via Zoom: Village Trustees, Lisa Beck, and Katrina Clark.
Audience Members in attendance, in-person: There were no audience members present, in-person.
Audience Members in attendance, via Zoom: There were 2 audience members present, via Zoom.
5. Public Comments [0:1:27 Zoom Meeting Recording]
Wodalski explained an email request he received, which he emailed out, from a resident whose side yard is on Fuller
Street. He stated this can be a future agenda item where we revisit the sidewalk and snowplowing policy is. He stated
with a residential sidewalk, we don’t typically plow those except in a few rare occasions, where there is no boulevard
and we plow snow directly onto the sidewalk. Zeyghami stated this could be added to an agenda for discussion.
MINUTES AND ACKNOWLEDGEMENTS
6. Approval of 09/14/2026 Public Works & Utility Committee Minutes. [0:02:44 Zoom Recording]
Motion by Mumper, second by Jordan: to approve the 09/14/2026 PW meeting minutes.
Yes Vote: 4 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS
Zeyghami, Hooshang {Chair} YES
Lopes-Serrao, Luis {Vice Chair} YES
Hubbard, Tom -----
Member (PC) Voting
Valerie Parker updated @ 10/14/2026 1:39 PM Page 2 Mtg_BOT_261019_Consent_Minutes_PW261012W261012
Jordan, Joe YES
Mumper, Roy YES
7. Acknowledge September 2026 Water and Sewer Permits [0:03:00 Zoom Meeting Recording]
Motion by Jordan, second by Mumper, to acknowledge September 2026 Water and Sewer Permits.
Yes Vote: 4 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS
Zeyghami, Hooshang {Chair} YES
Lopes-Serrao, Luis {Vice Chair} YES
Hubbard, Tom -----
Jordan, Joe YES
Mumper, Roy YES
STAFF REPORTS
8. CIP Update [0:03:16 Zoom Meeting Recording]
Wodalski pointed out that Parker is taking meeting minutes tonight, as Stacy Gilmeister had resigned from the Village of
Weston and has taken a position with a new employer. He stated we are actively recruiting for a new Utility Clerk. He
stated later this week there are a few scheduled interviews and they are hoping to have the position filled by the next
meeting.
Wodalski then went through his report.
9. Street Operations Update [0:16:35 Zoom Meeting Recording]
Blarek went through his report.
Mumper commented that when staff is spraying paint, even though latex, the staff may need some kind of respiratory
protection.
10. Utility Operations Update [0:26:38 Zoom Meeting Recording]
Swenson went through his report.
POLICY DISCUSSIONS AND RECOMMENDATIONS
11. Business 51 Reconstruction – Neupert Ave Pedestrian Crossing [0:33:24 Zoom Meeting Recording]
Dolan explained the report in the packet.
There was discussion on safety concerns with pedestrians crossing over Business 51.
Wodalski explained that that State considers this a perpetuation project, where it keeps the same geometry. If we want
to change anything then there is the cost difference for the municipality.
It was brought up that the pedestrian beacons are necessary to aid in the crosswalks.
Wodalski brought up the new bike and pedestrian evaluation process that is under development, and the State is going
to reach out to their central office at DOT to see if this would be a project that would fit under that.
Member (PC) Voting
Valerie Parker updated @ 10/14/2026 1:39 PM Page 3 Mtg_BOT_261019_Consent_Minutes_PW261012W261012
Mumper would like to see this be presented to the Community Life and Public Safety (CLPS) Committee
Motion by Mumper, second by Jordan, to move to proceed forward with addressing this and a good idea to add this,
and also to bring this before the CLPS Committee.
Yes Vote: 4 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS
Zeyghami, Hooshang {Chair} YES
Lopes-Serrao, Luis {Vice Chair} YES
Hubbard, Tom -----
Jordan, Joe YES
Mumper, Roy YES
12. Proclamation recognizing Crash Responders Safety Week from November 2 – 6, 2026. [0:42:58 Zoom Meeting
Recording]
Gebert summarized the report explaining that WisDOT’s Traffic Incident Management Enhancement (TIME) program is
asking all municipalities to recognize the Federal Highway Administration’s Crash Responder Safety Week (Nov. 2 – 6).
Wodalski pointed out that their website offers a slideshow.
Motion by Mumper, second by __, to recommend approval of Proclamation 2026-002 recognizing crash responder
safety week, November 2 – 6.
Yes Vote: 4 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS
Zeyghami, Hooshang {Chair} YES
Lopes-Serrao, Luis {Vice Chair} YES
Hubbard, Tom -----
Jordan, Joe YES
Mumper, Roy YES
13. 2027 Sanitary Sewer Rate Options [0:44:45 Zoom Recording]
Wodalski explained his report, pointing out that if we keep our vac truck sale, how we will probably break even. He
stated since we won’t have a large truck to sell every year, we would need to increase our rates to offset the increase in
proposed increased fees from RMMSD.
Wodalski explained the historical rate increases from RMMSD and how these are set on a year by year basis (not
projected out long-term). Other rate calculation options were discussed.
After further discussion it was agreed that Wodalski will bring back a couple of expense trends and bills from the past
few years and project out 2026 from RMMSD as well and bring the chart back (with a G & H scenario).
14. Sanitary Sewer I & I Study Results [1:10:35 Zoom Recording]
Member (PC) Voting
Member (PC) Voting
Valerie Parker updated @ 10/14/2026 1:39 PM Page 4 Mtg_BOT_261019_Consent_Minutes_PW261012W261012
Swenson gave an overview of the report from In-Pipe Technologies who performed an I & I study.
Swenson explained that while the data collection portion is done, they are still working on getting us the full report yet.
Swenson will follow up at the next meeting for presentation.
Motion by Lopes-Serrao, second by Mumper, to acknowledge the Sanitary Sewer I & I Study Results.
Yes Vote: 4 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS
Zeyghami, Hooshang {Chair} YES
Lopes-Serrao, Luis {Vice Chair} YES
Hubbard, Tom -----
Jordan, Joe YES
Mumper, Roy YES
15. Potential Utility Easement from Executive Ct to Kramer Ln [1:22:44 Zoom Recording]
Wodalski explained that the property owner of 7209 Executive Court owns this property on the northeast corner of the
cul-de-sac as well as the property that fronts Kramer Lane. This owner is looking to purchase a 30-33-foot strip of land
from his neighbor to the north. He stated a thought was to use this area as a spot to loop our water main out to Kramer
Lane in the future and asked if the Committee would want to have a utility easement reserved and work with the owner
at the time of the sale or wait. He stated it would be a permanent easement.
After some discussion it was agreed to have staff investigate this work.
Motion by Mumper, second by Lopes-Serrao, to recommend that staff analyze the potential cost of an easement and
bring back to subsequent action at a later meeting.
Yes Vote: 4 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS
Zeyghami, Hooshang {Chair} YES
Lopes-Serrao, Luis {Vice Chair} YES
Hubbard, Tom -----
Jordan, Joe YES
Mumper, Roy YES
16. Engineering Design Contract for Volkman St (Bus 51 to McIntyre Ave) [1:25:27 Zoom Recording]
Wodalski provided a summary of his report, explaining that the ask is for the $22,500 on the Business 51 to McIntyre
section of Volkman.
Motion by Mumper, second by Jordan, to approve having Becher Hoppe design the infrastructure work on Volkman St,
between Business 51 and McIntyre, in the amount of $22,500.
Yes Vote: 4 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS
Member (PC) Voting
Member (PC) Voting
Valerie Parker updated @ 10/14/2026 1:39 PM Page 5 Mtg_BOT_261019_Consent_Minutes_PW261012W261012
Zeyghami, Hooshang {Chair} YES
Lopes-Serrao, Luis {Vice Chair} YES
Hubbard, Tom -----
Jordan, Joe YES
Mumper, Roy YES
17. BUS 51 Storm Pond Construction Services Contract [1:27:40 Zoom Recording]
Wodalski explained his report on this topic, and how we are working with Rothschild and Schofield on this project. He
explained the cost sharing amongst the municipalities. He stated the proposal is to continue working with Stand
Associates to oversee the construction work also continue assistance with the administration of the clean water fund
loan.
There was some discussion on the potential for a municipality to back out, which then everyone else would pick up.
Motion by Lopes-Serrao, second by Mumper, to recommend the Village Board approve the contract amendment with
Strand Associates for construction and clean water fund loan oversight for the WisDOT Storm Pond Project in the
amount of $92,800, contingent on approval from our partner communities.
Yes Vote: 4 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS
Zeyghami, Hooshang {Chair} YES
Lopes-Serrao, Luis {Vice Chair} YES
Hubbard, Tom -----
Jordan, Joe YES
Mumper, Roy YES
18. Draft 2027 Street Maintenance Plan [1:30:40 Zoom Recording]
Wodalski commented on budget being set and how he and Blarek have been working on what streets to look at for 2027
and get bid packets out earlier. He then explained some of the projects we are looking at.
Motion by Mumper, second by Jordan, to recommend the Village Board approve the 2027 Street Maintenance Plan as
presented.
Yes Vote: 4 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS
Zeyghami, Hooshang {Chair} YES
Lopes-Serrao, Luis {Vice Chair} YES
Hubbard, Tom -----
Jordan, Joe YES
Mumper, Roy YES
FUTURE ITEMS [1:34:23 Zoom Recording]
19. Next meeting date(s):
a. Monday, November 9, 2026 @4:30 pm Regular Meeting
b. Monday, December 14, 2026 @ 4:30pm Regular Meeting
Member (PC) Voting
Member (PC) Voting
Member (PC) Voting
Valerie Parker updated @ 10/14/2026 1:39 PM Page 6 Mtg_BOT_261019_Consent_Minutes_PW261012W261012
20. Topics for future meetings
a. Watermain Replacement
Wodalski stated we are working with MSA to get surveys back this fall, and hoping for an update for next month.
21. Remarks from Staff
a. Wednesday, October 14, 2026 @ 5:30pm – Ross Ave (River Bend Rd to Pauls Ave) Public Information Meeting
b. Wednesday, October 21, 2026 @ 4:00p m – Pints, Plows, & Smart Salting Policies Event
Wodalski summarized the two October events.
Gebert commented on the Farmer’s Market survey. She also pointed out the “Spooky Map” that we are doing to
engage families and to let the public know where participating neighborhoods are for trick-of-treating along with seeing
creative decorations.
Swenson recognized Gilmeister for her great efforts she did for the Village.
22. Remarks from Committee Members
Mumper commented that the presentation on utility cost was well done.
23. Announcements
ADJOURNMENT
Motion by Jordan, second by Mumper: to adjourn at 6:07 p.m.
Hooshang Zeyghami, Village Trustee and Public Works & Utility Committee Chair
Michael Wodalski, Public Works Director
Valerie Parker, Recording Secretary
From: jjjhrj111@aol.com
To: Michael Wodalski
Subject: Snow Plowing by Village of Weston
Date: Tuesday, October 6, 2026 3:24:29 PM
Hi Michael & Board of Trustees, my Husband & I are requesting that the Village plows the
snow from Ross Avenue to High Ridge Circle on the West side of our home. I have had a
number of discussions with Michael on the matter, however was told he needed to present to
the Board. John & I live at 5700 High Ridge Circle & have been residents in the Village for 30
plus years. In addition, I ran a business in Weston for over 34 years, We have no sidewalk in
the front of our home currently. Michael tells us we are required to plow the sidewalk. We
never had a side walk for over 30 years on Fuller.
I plowed this past Winter, as my Husband John has been disabled for over 40 plus years. This
is not a safe situation, nor happy about it. Our road High Ridge Circle in one of the last roads
to be plowed. Ross & Fuller is plowed early morning. I try to get the sidewalk cleared early
morning , before packed down from people walking. To accomplish this, my choices are if not
plowed go onto the black top road on High Ridge & plow down to Fuller. If High Ridge
plowed, pull blower backwards down High Ridge to Fuller as can't run blower due to gravel. .
This intersection has a stop sign on High Ridge where all the traffic from subdivision comes
through. If our home faced Fuller , I could understand it would be our responsibility, Our
home & the Anderson's are the only ones that do not face Fuller, everyone else does.
I would like to know why the Village plows the sidewalk on Mesker Street? I have saw them
plow numerous times Mesker Street that intersects with Lee Avenue. This is the exact
situation as we have, duplex faces Lee Avenue. Why are the owner's & business's not
responsible? My business was located on Schofield Avenue & this was also plowed by the
Village ,
We are hoping you would review this matter & consider plowing this section of sidewalk. The
Village plows all along Ross Avenue behind our subdivision BUT stops at Fuller Street.
Looking forward to hearing back from you on this situation,
Sincerely, Holly & John Jorgensen
Date From 10/1/2026 and Date To 10/31/2026 and Template Meter
Permits Issued
Issue DatePermit Address Contractor Permit # ValuationOwner Name FeesParcel IDTemplate Finished
Sq Ft
Project
Sq Ft
Village of Weston
202601736 4504 Cedar Avenue,
WESTON
HUSKI
PLUMBING &
HEATING
10/27/2026192280816309
42
SURVIVOR'S TRUST $600.00Meter 0 506
Village of Weston Permits Valuation
Village of Weston Permits Fees
Village of Weston Permits Issued 1
$600
Village of Weston Permits Finished SqFt
0 Village of Weston Permits Project SqFt
1Total Permits Issued
Total Permits Fees
Total Permits Valuation
$600
Total Finished Sq Ft
Total Project Sq Ft 0
Date From 10/1/2026 and Date To 10/31/2026 and Template Lateral
Permits Issued
Issue DatePermit Address Contractor Permit # ValuationOwner Name FeesParcel IDTemplate Finished
Sq Ft
Project
Sq Ft
Village of Weston
202601639 5700 Quartz Trail
Road, WESTON
Timber Ridge
Builders LLC.
10/12/2026192280822201
59
TIMBER RIDGE BUILDERS
LLC
$50.00Lateral 0 503
202601640 5706 Quartz Trail
Road, WESTON
Timber Ridge
Builders LLC.
10/12/2026192280822201
60
TIMBER RIDGE BUILDERS
LLC
$50.00Lateral 0 503
202601641 5712 Quartz Trail
Road, WESTON
Timber Ridge
Builders LLC.
10/12/2026192280822201
61
TIMBER RIDGE BUILDERS
LLC
$50.00Lateral 0 503
202601642 5716 Quartz Trail
Road, WESTON
Timber Ridge
Builders LLC.
10/12/2026192280822201
62
TIMBER RIDGE BUILDERS
LLC
$50.00Lateral 0 503
202601632 3509 Ross Avenue,
WESTON
Steve's
Plumbing and
Heating
10/09/2026192280817100
73
TEREK HARTEAU $5,340 $40.00Lateral 0 503
Village of Weston Permits Valuation
Village of Weston Permits Fees
Village of Weston Permits Issued 5
$240
$5,340
Village of Weston Permits Finished SqFt
0 Village of Weston Permits Project SqFt
5Total Permits Issued
Total Permits Fees
Total Permits Valuation
$240
$5,340
Total Finished Sq Ft
Total Project Sq Ft 0
REQUEST FOR CONSIDERATION
REQUEST FOR CONSIDERATION
PAGES 1 OF 7
Public Mtg/Date:
Public Works Committee – 10/12/2026
Description:
Capital Improvement Plan Update
From:
Michael Wodalski, Director of Public Works
Question:
Solely an update on project status
Background
Current Capital Improvement Plan Projects
Below is an update on the status of the various Capital Improvement Plan Projects that
are ongoing.
- Street Projects:
1. Weston Ave (CR-X to CR-J):
East Construction Phase: 100% Complete
West Construction Phase 100% Complete
West Construction Phase 2 – Substantially Complete
Consultant: AECOM
Contractor: Integrity Grading and Excavating
Working on getting final assessments calculated.
2. Schofield Ave (Normandy Ave to Birch St): $2,652,390 in Grant Funds
Total Project Cost ~$7,668,000
Construction Year: 2025 – Substantially Complete
Consultant: Clark Dietz
Contractor: Haas
Nearly wrapped up and will work on Special Assessments this fall.
Trerweiler will come back in spring of 2027 to repair/replace any remaining
concrete approaches and slabs that need to be replaced.
3. Alderson St and Jelinek Ave Intersection:
Estimated Project Cost ~ $1,080,000
Construction Year: 2026
Consultant: Village / MSA
Contractor: Haas
This project is complete.
REQUEST FOR CONSIDERATION
REQUEST FOR CONSIDERATION
PAGES 2 OF 7
Figure 1: Aerial View of Alderson and Jelinek Intersection
4. Bloedel Ave:
Estimated Project Cost ~ $1,920,000
Construction Year: 2026
Consultant: Village
Contractor: Francis Melvin
REQUEST FOR CONSIDERATION
REQUEST FOR CONSIDERATION
PAGES 3 OF 7
Project is substantially completed.
Figure 2: Bloedel Ave looking west towards Cherry St.
5. Concord Ave and Bayberry St:
Construction Year: 2026
Consultant: Village
Contractor: Haas
This project is nearing
completion. Binder layer
of asphalt has been
paved and the contractor
is currently working on
adjusting watervalves
and manholes. Final
paving should be the
week of 11/9.
Concrete work will
continue into the week of
10/12 and asphalt work is
anticipated to start likely later the week of 10/19.
Figure 3: Concord Ave just west of CR-X looking west. Concrete
shoulder started on 10/7.
REQUEST FOR CONSIDERATION
REQUEST FOR CONSIDERATION
PAGES 4 OF 7
6. Ross Ave (Metro Dr/Pine St to Alderson St): $2,634,977 in Grant Funds
Total Project Cost Estimate ~ $4,271,800
Consultant: Becher Hoppe
Anticipate Construction in 2027 per DOT agreement
Design work is ongoing. ROW acquisition is the main task right now.
Project is slated for bidding early next year.
7. Ross Ave (River Bend to Pauls): $2,211,598 in Grant Funds
Estimated Project Cost ~ $4,986,600
Construction Year: ~2028
Consultant: Becher Hoppe
Working with the Town on the agreement. I have a draft in the November
packet for Public Works
8. Fuller St Reconstruction:
Total Project Cost ~ $4,239,000
Construction Year: 2025 – Substantially Complete
Consultant: Becher Hoppe
Contractor: Francis Melvin
There is punch-list work yet to be completed this fall.
9. Ross Ave and CR-X Intersection: $2,352,000 in Grant Funds
Estimated Project Cost ~ $2,952,000
Construction Year: ~2028
Consultant: SEH
Design work is progressing. There is a proposal from SEH for a separate
design contract for the Sternberg intersection.
10. Business 51 (Volkman St to Schofield Ave):
Construction Year: 2029/30
Consultant: Becher Hoppe
Becher Hoppe has submitted the 30% plans to the DOT. There is an item
in the packet about adding a crosswalk at Neupert Ave.
11. Business 51/STH 29 Storm Pond:
Construction Year: 2026/27
Consultant: Strand
I am working with the DNR and Strand to get our Clean Water Fund Loan
put together. The goal was to bid this project over winter and have it start
next year. There is an Intergovernmental Agreement in the packet for the
REQUEST FOR CONSIDERATION
REQUEST FOR CONSIDERATION
PAGES 5 OF 7
construction of the pond. This agreement then would supersede the
existing agreement for design of the pond.
12. Ferge, Post and Delonay:
Construction Year: 2027
Design Engineer: Village
Ike has begun preliminary design work. American Engineering and
Testing will be out in the next week or so gathering soil borings.
13. Howland Ave:
Construction Year: 2027
Design Engineer: Village
Ike has begun preliminary design work. American Engineering and
Testing will be out in the next week or so gathering soil borings.
- Utility Projects:
1. Well 4 PFAS Treatment:
Construction Cost: $2,821,651
• Principal Forgiveness Amount: $1,790,743.00
• Net Loan Amount: $767,460.00
Construction Year: 2025 – Substantially Complete
Consultant: AECOM
Contractor: August Winter
The GAC Tanks have been installed and water has been pumping to the
system as of 10/24/2025. Working on getting this project closed out as all
items have now been completed.
2. Well 3 Iron, Manganese and PFAS Treatment:
Construction Cost: $4,576,735
• Principal Forgiveness Amount: $3,012,992.00
• Net Loan Amount: $1,291,283.00
Construction Year: 2026
Consultant: AECOM
Contractor: 8Pine
Construction has started on the addition to the treatment plant for iron and
manganese removal. Substantial Completion is anticipated in April 2027.
3. Cedar Creek Interceptor Access Road:
Construction: Anticipate TBD
Consultant: Mi-Tech/TBD
Will be working on easements.
REQUEST FOR CONSIDERATION
REQUEST FOR CONSIDERATION
PAGES 6 OF 7
4. Bellewood Ave Watermain Replacement:
Construction Year: 2026
Consultant: Village/MTS
Contractor:
No bids were received on this project. It appears Rothschild will be
postponing the repaving of Bellewood to next year so we can rebid the
project and replace the watermain next year instead.
5. Military Road:
Construction Year: 2026
Consultant: MSA
Contractor: Steen Construction
Project is complete.
- Subdivision Projects:
1. Hinner Springs:
Construction Year: 2026
Developer: Timber Ridge Builders
Timber Ridge Builders are proposing an additional phase within the Hinner
Springs Subdivision to extend several more lots along Green Pastures
and are also looking to create 2 lots off of Birch St between Birchwood
Highlands and Green Pastures.
2. Green Tree Acres:
Construction Years: 2025-TBD
Developer: Green Tree Builders
Green tree will be starting Phase 3 work this fall/winter. They did
encounter some rock that they will need to blast in order to get the
sanitary sewer installed at the correct depth.
3. Granite Ridge Subdivision:
Construction: 2026 - TBD
Developer: Timber Ridge Builders
Timber Ridge has completed the infrastructure within Phase 1 of the
subdivision. If home sales go well, we anticipate seeing Phase 2 work
starting in spring.
Attached Docs:
Committee Action: N/A
Fiscal Impact:
Recommendation:
REQUEST FOR CONSIDERATION
REQUEST FOR CONSIDERATION
PAGES 7 OF 7
Recommended Language for Official Action
No Action is needed, solely a discussion item.
Or, Something else
_____________________________________________________________________
Additional action:
STAFF REPORT
STREET SUPERINTENDENT REPORT
PAGES 1 OF 11
Public
Mtg/Date:
Public Works Committee – 11/9/2026
Description: Street Operations Update
From: Forrest Blarek, Street Superintendent
Question: Solely an update on project status
Background
Current Street Operations Project:
• DPW installed a storm sewer next to the number 7-8 well and
disc golf course. They also did the grading around the
building for better drainage.
STAFF REPORT
STREET SUPERINTENDENT REPORT
PAGES 2 OF 11
• Crew memebers did some cleaning out and structuring of
the outfall pipe at the end of Cathy St.
• The area needed to be redefined as a basin to let debris
separate from the water.
• The outfall pipes flow line was also fixed as the concrete was
deterating.
• Not pictured: The shop made a trash guard for this outfall to
help catch debris and also stop kids from going into the
structure which the neighbors that live next to this said they
saw kids playing in the pipe. This guard is in place.
STAFF REPORT
STREET SUPERINTENDENT REPORT
PAGES 3 OF 11
• DPW along with RC Pavers did the
overlay of the North bound East lane
stretch of Heeren St from Shorey Ave to
Harney Ave.
• RC Pavers was contracted with
their paver and roller to pave this
section and for the Village to haul the
asphalt which in turn saved money for
this project.
• Pictured on the bottom is a cross
culvert on Harney Ave which needed
replacement and since that section of
road was getting paved DPW staff
replaced it and included it with the overlay project.
STAFF REPORT
STREET SUPERINTENDENT REPORT
PAGES 4 OF 11
• DPW shouldered streets.
• Staff coordinated the time frame to get projects wrapped up
before the yard waste pick up was scheduled and the
weather cooperated.
STAFF REPORT
STREET SUPERINTENDENT REPORT
PAGES 5 OF 11
• DPW crew did the restoration work on a water valve that was
replaced on the corner of Corozalla Dr and Mesker St.
• Crew poured back the concrete curb and did the topsoil and
seeding in this area.
STAFF REPORT
STREET SUPERINTENDENT REPORT
PAGES 6 OF 11
• Fall curbside yard waste pick up started up.
• This task requires a minimum of 4 DPW staff
members.
• There are 2 operators to run the 2 vac trucks
and 2 operators for the brush collection which
requires an end loader and a dump truck.
• The 2 vac trucks are averaging 10 loads each
per day and the capacity of these boxes are 20
cubic yards. Depending on the route and area
we are in, we do use nearby Village properties
for dump sites such as Kennedy Park for quicker
turnaround times to help us try to stay on schedule. These
sites get cleaned up on later dates and when staff members
are freed up.
STAFF REPORT
STREET SUPERINTENDENT REPORT
PAGES 7 OF 11
• Pictured is Shirely Ave which the Village DPW crew
reconstructed which was completed in July.
• RC Pavers was contracted to do the paving of this project.
• This combination of in-house labor and contracted services
provides the Village with a practical approach to managing
road construction projects. It allows the Village to maximize
its existing resources, reduce the need for additional
equipment investments, and still obtain professional paving
services to complete the project.
STAFF REPORT
STREET SUPERINTENDENT REPORT
PAGES 8 OF 11
STAFF REPORT
STREET SUPERINTENDENT REPORT
PAGES 9 OF 11
Fleet & Equipment Maintenance Update
Pictured from left to right:
First Picture: Unit 24
Unit 24, the John Deere grader, is currently being prepared for the
winter season. The wheels have been removed for sandblasting
and repainting, and new tires will be installed on the rear drive
axle once that work is complete. Minor rust repairs are also being
performed on the door jams and rear section of the machine.
Several mechanical repairs have been completed, including the
replacement of worn tie rod ends. During service, excessive
copper filings were found in the turntable fluid. The turntable was
disassembled, thoroughly cleaned, and inspected to ensure all
components were in good condition.
The unit has also received complete service and inspection. Once
work is finished, the snow wing will be installed, so the grader is
ready for winter operations.
Second Picture: Unit 81 Street sweeper
Unit 81 is undergoing routine maintenance to keep it in service
and operating reliably. As shown in the photo, the unit is receiving
a new center broom, one new curb broom, and new rubber
curtains. These replacements will improve sweeping performance
during operation.
The bottom pictures:
Units 961, 962(Leaf Vacs), 60, and 29 (Truck Units)– Leaf Vac
Operations
The leaf vac fleet continues to receive extensive daily
maintenance to ensure reliable operation throughout the
collection season. Each truck and leaf vac combination receives
STAFF REPORT
STREET SUPERINTENDENT REPORT
PAGES 10 OF 11
approximately two labor hours of preventive maintenance every
day per unit.
Daily maintenance tasks include:
• Washing the radiators on both the leaf vac and truck.
• Performing a general inspection of each unit to identify
potential issues.
• Greasing components and checking engine oil and coolant
levels on both the truck and leaf vac.
• Cleaning or replacing engine air filters and cab air filters as
needed.
• Thoroughly washing both units, with special attention given
to cleaning the exhaust screens on the leaf vac.
• Refueling all units.
Overall, the leaf vac fleet has experienced only minor mechanical
issues this season. One unit required replacement of the PTO
engagement module, while another required a new safety switch
after a malfunction. Unit 60 also required an air conditioning
system recharge. Despite these repairs, the Leaf vacs performed
well during the fall leaf collection season.
Additional Work Completed
• Unit 25(quad axel): Replaced a faulty air brake valve.
• Unit 202 (1-Ton Truck): Completed service and inspection,
installed new tires, washed the truck, and applied
undercoating.
• Unit 9(Tandem plow truck): Completed winter preparation,
including all scheduled maintenance and inspections.
• Front-End Loader Plows: Completed preseason service and
maintenance to ensure readiness for winter operations.
• Cathy Drive Culvert: Fabricated a new culvert grate.
• Fall Surplus Auction: Continued preparation of equipment
and materials for the upcoming surplus auction.
STAFF REPORT
STREET SUPERINTENDENT REPORT
PAGES 11 OF 11
In addition to routine fleet maintenance, the shop has remained
focused on winter equipment preparation, Fall clean-up
maintenance and surplus asset Auction. +
UTILITY REPORT FOR
OCTOBER 2026
1. Superintendent Comments
a. Water
Well 2 replace chlorine pump feed line
Well 5 dehumidifier maintenance
Well 6 dehumidifier maintenance
Well 7/8 Fluoride pump maintenance
Treatment Plant replace filt er bags prior to PFAS system
Business Park Tower full dr ain down interior cleaning
Completed multiple fire flow tests that were requested
Fixed hydrant that had a broken nozzle (Photo in report).
Cleared all of our non-draining hydrants in preparation for winter
Conducted our annual large meter testing
Cleaned out valve stacks noted after flushing operations were completed
Lead and Copper confirmation subm itted to DNR. Letters going to residents asap.
Operators assisted with utilit y requests on Bloedel, Concord and Military Projects.
Unidirectional Watermain flushi ng operations were completed.
Numerous lateral inspections wer e completed. (Photo in report).
Meter Card maint enance continued.
Private Well sampling collected.
LATERAL INSPECTION(S)
DAMAGED HYDRANT
b. Sewer
Heritage Hills Lift Station replaced check valve
River Park Lift Station ATS troubleshooting
Pointe List Station pump maintenance
Well 7/8 Lift Station pump maintenance
I&I Study final report received . IN-PIPE presentation at Nov. Public Works Meeting.
Sanitary Sewer jetting operations completed
Clean, collect pH Probe data also re-calibrated probes.
Clean bad spots.
Lift Station Cleaning fo r fall was completed.
Lift Station(s) standby gener ator general maintenance.
Lift Station(s) standby generat or battery maintenance conducted.
Lift Station(s) pump f ilters cleaned/replaced.
c. Diggers Hotline Locates
Village Utility Operators mark ed approximately 198 locates. Many communication
installations, project planning as well as upgrades to WPS gas lines.
d. Work Orders
Village Utility Operators comp leted 22 Work Orders. The majority of work orders were for
various water meter installations, meter communication issues, lateral inspections and
water quality responses.
e. Contract Work/Activi ties Completed/Upcoming
Permanent PFAS project for Well #3/Treatment Plant ongoing.
Entered Monthly we ll data to DNR.
Street/Subdivision Projects: Gr een Tree Acres ongoing, Grantie Ridge ongoing, Bloedel
Ave. Reconstruction and Concord/Bayberry Reconstruction.
Business Park Tower exterior cleaning and interior cleaning completed.
Valve Exercising program continues during flushing.
Water main flushing completed.
Sanitary Sewer jetting completed.
Lift Station cleaning for fall completed.
2. Customers Added
New customers added during the month.
*A new customer includes new connections and change in residences
Type No. of Customers
Residential Single Family/Condo's 43
Multi Family 2
Commercial/Industrial 8
Total 53
3. Water Pumped in 1,000s of gallons (Last 4 Months)
The Well #3 (Offline since 2022) portion of Treatment Plant project ongoing.
Alta Verde (#1) Kerry (#2) Mesker (#3) Sternberg (#4) Bloedel (#5)
July
Total - 22,778 - 23,721 -
Peak - 863 - 1,119 -
August
Total 15 20,393 - 23,107 22
Peak 15 949 - 923 22
September
Total - 23,986 - 18,761 -
Peak - 947 - 765 -
October
Total - 22,864 - 15,429 -
Peak - 871 - 617 -
15 90,021 - 81,018 22
Rippling Creek (#6) Well #7 Well #8 TOTALS
July
Total 9,371 14,896 15,024 85,790
Peak 505 678 682 481
August
Total 9,512 14,785 15,875 83,709
Peak 415 617 957 487
September
Total 2,949 11,803 11,815 69,314
Peak 268 482 496 370
October
Total 5,914 9,133 9,129 62,469
Peak 293 478 565 353
27,746 50,617 51,843
Total gal X 1000 301,282
Total gal X 1000
(Less Foremost) 211,261
4. Wastewater Flows (Last 4 Months)
Rib Mountain Metropolitan Sewerage District Flow Charge Totals.
Bus. 51 Flow
(X1000)
Cedar Creek Flow
(X1000)
Total Flow Charge
(X1000)
July
Total 18,772 15,128 33,900
August
Total 17,569 14,547 32,116
September
Total 17,916 13,914 31,830
October
Total 21,137 16,619 37,756
75,394 60,208 135,602
5. Lift Station Hours
Summary of Lift Station Hours for last two months.
Lift Station Hours
2026 Harlyn Fox St. Mesker/Jelinek Kathleen E.C. River
Month Pump
1
Pump
2
Pump
1
Pump
2
Pump
1
Pump
2
Pump
3
Pump
1
Pump
2
Pump
1
Pump
2
Sep 68.5 72 56.5 54.7 51.7 53.2 53.6 3.8 3.1 40.1 40.5
Oct 64.6 65.1 53.8 51.8 50.9 53.2 52.9 5.8 3.9 40 40.1
2026 Tanya/Tricia Progress Way Pointe Park Terrace Ryan St.
Month Pump
1
Pump
2
Pump
1
Pump
2
Pump
1
Pump
2
Pump
1
Pump
2
Pump
1
Pump
2
Pump
3
Sep 40 31.7 4.6 4.8 22.9 36.3 7.8 18.2 25.1 41.1 38.8
Oct 37 31 4.27 5.5 27.8 50.2 9.1 21.6 24.3 40.1 37.8
2026 Heritage Hills Ross Ave. Mesker/Colleen Trotzer
Month Pump
1
Pump
2
Pump
1
Pump
2
Pump
1
Pump
2
Pump
1
Pump
2
Sep 17.6 17.8 26.3 26.5 119 124.1 0.6 0.6
Oct 19.6 18.9 24.4 24.6 110.8 113.3 0.5 0.3
REQUEST FOR CONSIDERATION
REQUEST FOR CONSIDERATION
PAGES 1 OF 7
Public Mtg/Date:
Public Works Committee – 10/12/2026
Description:
Sanitary Sewer Rate Increase
From:
Michael Wodalski, PE - Director of Public Works
Josh Swenson – Utility Superintendent
Question: Should the Public Works Committee recommend the
Village Board increase the sanitary sewer utility rates?
Background
I have the information from the October 12, 2026 Public Works Meeting below.
Following that meeting I was asked to look at creating two other options.
- Option G which is an average cost between Option D (Break Even) and Option F
(Next Community). Option G provides a total Revenue of $2,451,473 and a net
income of $160,132.
- Option H is an average of Options D, E and F. (Option E was the average cost
of surrounding communities in 2026). With Option H, total revenue goes to
$2,417,788 and net income of $113,083.
I have an updated table below showing these two additional options:
Scenario Total Revenue Total Expenses Net Income
A $3,141,684 $3,925,000 - $783,316
B $3,402,768 $3,925,000 -$522,232
C $3,533,762 $3,925,000 -$391,238
D $3,926,746 $3,925,000 $1,746
E $3,948,840 $3,925,000 $23,840
H $4,038,083 $3,925,000 $113,083
G $4,085,132 $3,925,000 $160,132
F $4,243,518 $3,925,000 $318,518
Since last meeting, I also found out that the City of Stevens Point will be changing their
sanitary sewer rates starting in 2027, which will put their 2027 rate between Rothschild
and Mosinee. I believe this shows all of our communities are seeing increased costs
and eventually rates will need to be adjusted to keep up. The City of Merrill also has a
smaller increased planned for 2027. I’ve updated the regional comparisons on the next
page to show where the proposed options are in relation to the updated information
from the neighboring communities.
REQUEST FOR CONSIDERATION
REQUEST FOR CONSIDERATION
PAGES 2 OF 7
$-
$20.00
$40.00
$60.00
$80.00
$100.00
$120.00
$140.00
$160.00
Central WI Sewer Quarterly Utility Rates
based on a 12,000 gallon bill
(updated 11/3/26)
REQUEST FOR CONSIDERATION
REQUEST FOR CONSIDERATION
PAGES 3 OF 7
After the October Public Works Meeting I was also asked to take a look at the historic
costs from RMMSD. Below is a table from 2014 through the projected 2027 budget.
Since 2014, total increase is nearly $1.4 Million and since 2023, increase is a little over
$700,000. The major Capital/Debt costs started in 2024, which was an immediate
$430,000 increase for Weston in 2024.
$-
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026* 2027**
RMMSD Operating and Capital Costs (2014 - 2027)
Operating Capital
REQUEST FOR CONSIDERATION
REQUEST FOR CONSIDERATION
PAGES 4 OF 7
Looking at the graph in the previous page you can see in the 2014 through 2018
timeframe there was some yearly variation in the RMMSD costs, but an increase one
year didn’t necessarily mean an increase the following year. We then saw a larger
increase in 201, but then a decrease again in 2020 and 2021. Once we got to 2024
though the thought was lets wait to see if 2025 or 2026 brings about a decrease similar
to what we had seen historically, but that does not appear to be the case moving
forward and we inevitably need to make a change to rates to account for the increased
costs to the sanitary sewer utility.
PUBLIC WORKS 10/12/2026 Meeting Information
The Village of Weston’s Sanitary Sewer Utility Rates were last increased in January of
2025. This adjustment was made due to the sewer utility running at a deficit and trying
to break even from the increase in costs from the Rib Mountain Metropolitan Sewerage
District (RMMSD) fees which are related to their treatment plant construction project.
Roughly 90% of the Village’s wastewater flows to and is treated by RMMSD thus, when
the bills from RMMSD go up, the Village’s sanitary sewer costs go up.
At the end of 2025, the Sanitary Sewer Utility operated at a loss of $440,571 for the
year. For 2026, the Sanitary Sewer Utility as of the end of August is at a positive
$96,201, however the Village did sell our older Sewer Vac Truck in March of 2026 for
$352,500, thus without that sale, the sewer utility is operating at a loss of $256,299.
Heading to year end, we’re projecting we’ll be likely around a loss of $400,000 if we
remove the sale of the old vac truck. Since we don’t have a vac truck to sell every year
we will need to increase the sewer rates to offset the increase in fees from RMMSD.
The Village received RMMSD’s preliminary 2027 budget, which forecasts an additional
$100,000 in costs for the Village of Weston Sanitary Sewer.
As I look at projecting out to next year I looked at 5 potential options to see what the
potential revenue and expenses would be. I have the options laid out below. To make
the calculations I used the following assumptions:
- Projected 2027 expenses = $3,925,000
- Total number of equivalent meters (3/4-inch meters) = 8,048 (2026 YTD count)
- Total 1,000s of gallons of sewer billed = 374,270.60 (this was the 2025 actual)
- Estimated Non-Operating Revenue = $325,000
Sanitary sewer bills are calculated off of a base fee which is determined by the size of
the meter serving the property. Then there is a consumption fee which is calculated
based on every 1,000 gallons of water used.
REQUEST FOR CONSIDERATION
REQUEST FOR CONSIDERATION
PAGES 5 OF 7
There are many different options to adjust the sewer rate, but for preliminary analysis I
moved forward with 5 scenarios which are:
A) Do Nothing (-$783,316) – This scenario does not adjust current rates and was
more for seeing what the projected deficit for 2027 would be if the rate does not
change.
B) 33% Recovery (-$522,232) – This would be a 3-step approach to breaking even
where we’d recover 33% of the deficit in 2027 and then recover another third in
2028 and the last third in 2029 where then revenues would match expenses.
C) Half Recovery (-$391,238) – This would be a 2-step approach to breaking even
where we’d look to recover 50% of the deficit in 2027 and then revaluate for 2028
with likely a second increase to cover the remaining 50%.
D) Break Even ($1,746) – this was the rates we’d need to charge to have the sewer
utility break even in 2027. The goal of this would be to have revenues match
expenses in 2027.
E) Average Rates for Area Communities ($23,840) – This scenario put our rates at
the average for the area communities for 2027. Overall, this scenario is a little
more than the break even scenario, but does project a slight positive net income.
F) Compare to the next highest community above break even ($318,518) – If we
wanted to have some positive net income in 2027, but didn’t want to change our
positioning with our neighboring communities at a break even point. This
scenario would leave us just under a quarterly cost for the Village of
Kronenwetter.
A table of those scenarios is shown below:
Scenario Total Revenue Total Expenses Net Income
A $3,141,684 $3,925,000 - $783,316
B $3,402,768 $3,925,000 -$522,232
C $3,533,762 $3,925,000 -$391,238
D $3,926,746 $3,925,000 $1,746
E $3,948,840 $3,925,000 $23,840
F $4,243,518 $3,925,000 $318,518
When looking at neighboring communities in Central Wisconsin, and assuming an
average residential property uses 12,000 gallons of water a quarter, the bill for a
Weston Utility customer is currently $89.25, which is the 3
rd lowest in the area out of 11
communities. If we look at a stepped approach, Weston would still be the 3rd lowest
community in 2027. If we wanted to get to a break-even point, Weston would move to
the 5th lowest community or (5 of 11). The last scenario shows what an approximate
rate would be for Weston if we got close to the 6
th community, but still stayed slightly
REQUEST FOR CONSIDERATION
REQUEST FOR CONSIDERATION
PAGES 6 OF 7
under. That scenario has a positive net income over $318,000. The figures below
show this data in a tabular and graphical format.
Table 1: Central WI Sanitary Sewer Rates as of 9/15/26
$-
$20.00
$40.00
$60.00
$80.00
$100.00
$120.00
$140.00
$160.00
Central WI Sewer Quarterly Utility Rates
based on a 12,000 gallon bill
(updated 9/15/26)
REQUEST FOR CONSIDERATION
REQUEST FOR CONSIDERATION
PAGES 7 OF 7
There are many different combinations we can make, but I’d like to get this discussion
started here so we can look at where we want to be by the end of 2027. We’ve been
using up fund balance the last several years running at a deficit and should look at
breaking even at a minimum in the near future as it’s not sustainable to keep the rates
where they are currently.
Staff is looking for guidance on the scenarios and other opinions the committee may
have. Rib Mountain does have a separate sewer charge for industrial users, which is a
higher rate than residential and commercial users. That is another option we could look
at, but is not as common.
Attached Docs: - See above tables and graphs
- Scenario Calculations
__________ ____________________________________________________________
Committee Action: - Public Works previously recommended an increase in 2024
Fiscal Impact: - Sewer utility is projected to have a deficit of $783,316 in
2027.
_______________ ____________________________________________________________________________
Recommendation: Staff recommends moving forward with a rate increase for
2027 and is looking for feedback from the Committee on how
best to move forward. A breakeven increase would raise a
residential quarterly bill by $25.07.
Recommended Language for Official Action
I Move to _______________________ .
Or, Something else
____________________________________________________________________
Additional action:
Weston Sewer Utility 11/04/26
2027 Financial Projections
Projected Total Expenses for 2027 3,925,000$
325,000$
3,600,000$
1,113,753$
2,486,247$
1,702,931$ (Based on 2025 flow)
Units Billed in (1000's of gallons) = 374,270.6 @ $4.55
(783,316.0) Shortfall
Estimated 2027 Base Charge Revenues with $0.00/1000 Increase
Base charges increased ±0%
Customer count as of 12/31/25
Meter Size Rate/Qtr.
Base Charge Ratio
(multiple of 5/8") Number of Meters Equivalent Meters Total Annual Charges
5/8" / 3/4" $34.65 1.0 5,859 5,859.0 812,057 $
1" $103.43 3.0 147 441.0 60,817 $
1 1/2" $206.85 6.0 136 816.0 112,526$
2" $344.40 10.0 40 400.0 55,104 $
3" $791.70 23.0 12 276.0 38,002 $
4" $1,411.20 41.0 4 164.0 22,579 $
6" $3,166.80 92.0 1 92.0 12,667$
Totals 6,199.0 8,048.0 1,113,753$
Revenue Excess/(Shortfall) (783,316)$
Increase in Base Rate Needed (%) 70.33%
Increase in total equivalent meters needed 5,652
Increase in volume charges to meet total revenue target 31.51%
Average Residential Bill (48,000 gallons per year)
Base Charge 34.65$
Volume Charge 54.60$
Total 89.25$
0.00%
Projected Non-operating (Other) Income
Required Operating Revenue from metered sales =
Estimated Revenue from Base Charges
Required Revenue from Volume Charges =
Estimated Revenue from Volume Charges =
Revenue Excess (Shortfall) from metered sales =
2027 Estimate: Option A - Do Nothing
% Change from '26
Weston Sewer Utility 11/04/26
2027 Financial Projections
Projected Total Expenses for 2027 3,925,000$
325,000$
3,600,000$
1,225,128$
2,374,872$
1,852,640$ (Based on 2025 flow)
Units Billed in (1000's of gallons) = 374,270.6 @ $4.95
(522,232.5) Shortfall
Estimated 2027 Base Charge Revenues with $0.40/1000 Increase
Base charges increased ±10%
Customer count as of 12/31/25
Meter Size Rate/Qtr.
Base Charge Ratio
(multiple of 5/8") Number of Meters Equivalent Meters Total Annual Charges
5/8" / 3/4" $38.12 1.0 5,859 5,859.0 893,263 $
1" $113.77 3.0 147 441.0 66,899$
1 1/2" $227.54 6.0 136 816.0 123,779$
2" $378.84 10.0 40 400.0 60,614$
3" $870.87 23.0 12 276.0 41,802$
4" $1,552.32 41.0 4 164.0 24,837$
6" $3,483.48 92.0 1 92.0 13,934$
Totals 6,199.0 8,048.0 1,225,128$
Revenue Excess/(Shortfall) (522,232)$
Increase in Base Rate Needed (%) 42.63%
Increase in total equivalent meters needed 3,425
Increase in volume charges to meet total revenue target 21.99%
Average Residential Bill (48,000 gallons per year)
Base Charge 38.12$
Volume Charge 59.40$
Total 97.52$
9.26%
Projected Non-operating (Other) Income
Required Operating Revenue from metered sales =
Estimated Revenue from Base Charges
Required Revenue from Volume Charges =
Estimated Revenue from Volume Charges =
Revenue Excess (Shortfall) from metered sales =
2027 Estimate: Option B - 33% Recovery
% Change from '26
Weston Sewer Utility 11/04/26
2027 Financial Projections
Projected Total Expenses for 2027 3,925,000$
325,000$
3,600,000$
1,225,128$
2,374,872$
1,983,634$ (Based on 2025 flow)
Units Billed in (1000's of gallons) = 374,270.6 @ $5.30
(391,237.8) Shortfall
Estimated 2027 Base Charge Revenues with $0.75/1000 Increase
Base charges increased ±10%
Customer count as of 12/31/25
Meter Size Rate/Qtr.
Base Charge Ratio
(multiple of 5/8") Number of Meters Equivalent Meters Total Annual Charges
5/8" / 3/4" $38.12 1.0 5,859 5,859.0 893,263 $
1" $113.77 3.0 147 441.0 66,899$
1 1/2" $227.54 6.0 136 816.0 123,779$
2" $378.84 10.0 40 400.0 60,614$
3" $870.87 23.0 12 276.0 41,802$
4" $1,552.32 41.0 4 164.0 24,837$
6" $3,483.48 92.0 1 92.0 13,934$
Totals 6,199.0 8,048.0 1,225,128$
Revenue Excess/(Shortfall) (391,238)$
Increase in Base Rate Needed (%) 31.93%
Increase in total equivalent meters needed 2,566
Increase in volume charges to meet total revenue target 16.47%
Average Residential Bill (48,000 gallons per year)
Base Charge 38.12$
Volume Charge 63.60$
Total 101.72$
13.97%
Projected Non-operating (Other) Income
Required Operating Revenue from metered sales =
Estimated Revenue from Base Charges
Required Revenue from Volume Charges =
Estimated Revenue from Volume Charges =
Revenue Excess (Shortfall) from metered sales =
2027 Estimate: Option C - Half Recovery
% Change from '26
Weston Sewer Utility 11/04/26
2027 Financial Projections
Projected Total Expenses for 2027 3,925,000$
325,000$
3,600,000$
1,225,128$
2,374,872$
2,376,618$ (Based on 2025 flow)
Units Billed in (1000's of gallons) = 374,270.6 @ $6.35
1,746.4 Excess
Estimated 2027 Base Charge Revenues with $1.80/1000 Increase
Base charges increased ±10%
Customer count as of 12/31/25
Meter Size Rate/Qtr.
Base Charge Ratio
(multiple of 5/8") Number of Meters Equivalent Meters Total Annual Charges
5/8" / 3/4" $38.12 1.0 5,859 5,859.0 893,263 $
1" $113.77 3.0 147 441.0 66,899 $
1 1/2" $227.54 6.0 136 816.0 123,779$
2" $378.84 10.0 40 400.0 60,614 $
3" $870.87 23.0 12 276.0 41,802 $
4" $1,552.32 41.0 4 164.0 24,837 $
6" $3,483.48 92.0 1 92.0 13,934$
Totals 6,199.0 8,048.0 1,225,128$
Revenue Excess/(Shortfall) 1,746$
Increase in Base Rate Needed (%) -0.14%
Increase in total equivalent meters needed (11)
Increase in volume charges to meet total revenue target -0.07%
Average Residential Bill (48,000 gallons per year)
Base Charge 38.12$
Volume Charge 76.20$
Total 114.32$
28.08%
Projected Non-operating (Other) Income
Required Operating Revenue from metered sales =
Estimated Revenue from Base Charges
Required Revenue from Volume Charges =
Estimated Revenue from Volume Charges =
Revenue Excess (Shortfall) from metered sales =
2027 Estimate: Option D - Break Even
% Change from '26
Weston Sewer Utility 11/04/26
2027 Financial Projections
Projected Total Expenses for 2027 3,925,000$
325,000$
3,600,000$
1,269,678$
2,330,322$
2,354,162$ (Based on 2025 flow)
Units Billed in (1000's of gallons) = 374,270.6 @ $6.29
23,840.3 Excess
Estimated 2027 Base Charge Revenues with $1.74/1000 Increase
Base charges increased ±14%
Customer count as of 12/31/25
Meter Size Rate/Qtr.
Base Charge Ratio
(multiple of 5/8") Number of Meters Equivalent Meters Total Annual Charges
5/8" / 3/4" $39.50 1.0 5,859 5,859.0 925,745 $
1" $117.91 3.0 147 441.0 69,331$
1 1/2" $235.81 6.0 136 816.0 128,280$
2" $392.62 10.0 40 400.0 62,819$
3" $902.54 23.0 12 276.0 43,322$
4" $1,608.77 41.0 4 164.0 25,740$
6" $3,610.15 92.0 1 92.0 14,441$
Totals 6,199.0 8,048.0 1,269,678$
Revenue Excess/(Shortfall) 23,840$
Increase in Base Rate Needed (%) -1.88%
Increase in total equivalent meters needed (151)
Increase in volume charges to meet total revenue target -1.02%
Average Residential Bill (48,000 gallons per year)
Base Charge 39.50$
Volume Charge 75.48$
Total 114.98$
28.83%
Required Operating Revenue from metered sales =
2027 Estimate: Option E - Average in Area
Estimated Revenue from Volume Charges =
Projected Non-operating (Other) Income
Estimated Revenue from Base Charges
Required Revenue from Volume Charges =
Revenue Excess (Shortfall) from metered sales =
% Change from '26
Weston Sewer Utility 11/04/26
2027 Financial Projections
Projected Total Expenses for 2027 3,925,000$
325,000$
3,600,000$
1,392,191$
2,207,809$
2,526,327$ (Based on 2025 flow)
Units Billed in (1000's of gallons) = 374,270.6 @ $6.75
318,517.5 Excess
Estimated 2027 Base Charge Revenues with $2.20/1000 Increase
Base charges increased ±25%
Customer count as of 12/31/25
Meter Size Rate/Qtr.
Base Charge Ratio
(multiple of 5/8") Number of Meters Equivalent Meters Total Annual Charges
5/8" / 3/4" $43.31 1.0 5,859 5,859.0 1,015,072$
1" $129.29 3.0 147 441.0 76,021$
1 1/2" $258.56 6.0 136 816.0 140,658$
2" $430.50 10.0 40 400.0 68,880$
3" $989.63 23.0 12 276.0 47,502$
4" $1,764.00 41.0 4 164.0 28,224$
6" $3,958.50 92.0 1 92.0 15,834$
Totals 6,199.0 8,048.0 1,392,191$
Revenue Excess/(Shortfall) 318,518$
Increase in Base Rate Needed (%) -22.88%
Increase in total equivalent meters needed (1,838)
Increase in volume charges to meet total revenue target -14.43%
Average Residential Bill (48,000 gallons per year)
Base Charge 43.31$
Volume Charge 81.00$
Total 124.31$
39.29%
Required Revenue from Volume Charges =
Required Operating Revenue from metered sales =
2027 Estimate: Option F - Next Community
Estimated Revenue from Volume Charges =
Projected Non-operating (Other) Income
Estimated Revenue from Base Charges
Revenue Excess (Shortfall) from metered sales =
% Change from '26
Weston Sewer Utility 11/04/26
2027 Financial Projections
Projected Total Expenses for 2027 3,925,000$
325,000$
3,600,000$
1,308,659$
2,291,341$
2,451,473$ (Based on 2025 flow)
Units Billed in (1000's of gallons) = 374,270.6 @ $6.55
160,132.0 Excess
Estimated 2027 Base Charge Revenues with $2.00/1000 Increase
Base charges increased ±17.5%
Customer count as of 12/31/25
Meter Size Rate/Qtr.
Base Charge Ratio
(multiple of 5/8") Number of Meters Equivalent Meters Total Annual Charges
5/8" / 3/4" $40.71 1.0 5,859 5,859.0 954,167 $
1" $121.53 3.0 147 441.0 71,460$
1 1/2" $243.05 6.0 136 816.0 132,219$
2" $404.67 10.0 40 400.0 64,747$
3" $930.25 23.0 12 276.0 44,652$
4" $1,658.16 41.0 4 164.0 26,531$
6" $3,720.99 92.0 1 92.0 14,884$
Totals 6,199.0 8,048.0 1,308,659$
Revenue Excess/(Shortfall) 160,132$
Increase in Base Rate Needed (%) -12.24%
Increase in total equivalent meters needed (983)
Increase in volume charges to meet total revenue target -6.99%
Average Residential Bill (48,000 gallons per year)
Base Charge 40.71$
Volume Charge 78.60$
Total 119.31$
33.68%
Revenue Excess (Shortfall) from metered sales =
% Change from '26
2027 Estimate: Option G - Avg of Break Even and Next Community
Projected Non-operating (Other) Income
Required Operating Revenue from metered sales =
Estimated Revenue from Base Charges
Required Revenue from Volume Charges =
Estimated Revenue from Volume Charges =
Weston Sewer Utility 11/04/26
2027 Financial Projections
Projected Total Expenses for 2027 3,925,000$
325,000$
3,600,000$
1,295,294$
2,304,706$
2,417,788$ (Based on 2025 flow)
Units Billed in (1000's of gallons) = 374,270.6 @ $6.46
113,082.6 Excess
Estimated 2027 Base Charge Revenues with $1.91/1000 Increase
Base charges increased ±16.3%
Customer count as of 12/31/25
Meter Size Rate/Qtr.
Base Charge Ratio
(multiple of 5/8") Number of Meters Equivalent Meters Total Annual Charges
5/8" / 3/4" $40.30 1.0 5,859 5,859.0 944,423 $
1" $120.29 3.0 147 441.0 70,730 $
1 1/2" $240.57 6.0 136 816.0 130,868$
2" $400.54 10.0 40 400.0 64,086 $
3" $920.75 23.0 12 276.0 44,196 $
4" $1,641.23 41.0 4 164.0 26,260 $
6" $3,682.99 92.0 1 92.0 14,732$
Totals 6,199.0 8,048.0 1,295,294$
Revenue Excess/(Shortfall) 113,083$
Increase in Base Rate Needed (%) -8.73%
Increase in total equivalent meters needed (702)
Increase in volume charges to meet total revenue target -4.91%
Average Residential Bill (48,000 gallons per year)
Base Charge 40.30$
Volume Charge 77.52$
Total 117.82$
32.01%
Estimated Revenue from Volume Charges =
Revenue Excess (Shortfall) from metered sales =
% Change from '26
2027 Estimate: Option H - Avg of Break Even, Avgs. and Next Community
Projected Non-operating (Other) Income
Required Operating Revenue from metered sales =
Estimated Revenue from Base Charges
Required Revenue from Volume Charges =
REQUEST FOR CONSIDERATION
REQUEST FOR CONSIDERATION
PAGES 1 OF 2
Public Mtg/Date:
Public Works Committee – 11/9/2026
Description:
Sidewalk Snow Removal Policy
From:
Michael Wodalski, PE - Director of Public Works
Question: Does the Public Works Committee see a need to make
changes to the current sidewalk snow removal policy?
Background
The Village of Weston adopted the attached Snow and Ice Control Policy in 2014 and
have been utilizing those guidelines since then to dictate the Village’s Snow and Ice
Response.
It’s a small section, but within the policy it mentions which sidewalks and multi-use
paths the Village will maintain. In reviewing the document, there are areas that we need
to add as new multi-use paths have been added and as a general guideline, the Village
does remove snow from multi-use paths.
The sidewalks listed within the policy include:
- Schofield Ave from Ryan St to BUS 51
- BUS 51 from Jelinek Ave to Schofield Ave
- Camp Phillips/CR-X from Howland Ave to Northwestern Ave
The above are streets along arterial roadways with multiple lanes of travel and narrow
boulevards. Due to that, there is more snow accumulation along those sidewalks and
the Village has historically committed to removing snow along those major routes.
Additionally, sidewalk adjacent to Village owned land such as Kennedy Park and the
Public Safety Building are noted as the Village is the adjacent property owner. There
are also two areas in the Village where there is no boulevard which is on Birch St near
Sternberg Ave and then on Mesker St from Schofield Ave to Lee St. In those two
cases, the Village will also clear snow as the sidewalk is the entire windrow of snow off
of the plow.
I have the map of the sidewalks and paths cleared by the Village attached as well.
Our Municipal Ordinance (Sec. 70.112 Cleaning of Sidewalks) is attached and specifies,
“The owner of property or party in possession of the property abutting on any sidewalk
shall, without notice and at all times, keep such abutting sidewalk clean and free from
debris, dirt, sweepings, obstructions and clear of snow and ice … “
As we have begun to install sidewalks within reconstructed roads, snow removal on
sidewalks comes up as a question. Attached is a letter from a homeowner whose side
yard is Fuller St and had sidewalk installed in 2025. I have held the position with the
resident that the resident is responsible for removal of snow on their sidewalk.
REQUEST FOR CONSIDERATION
REQUEST FOR CONSIDERATION
PAGES 2 OF 2
In reviewing the policy, I believe it still meets the intent of the Village’s capabilities for
snow and ice removal, but we should look at updating the information as there have
been some changes over the past 12 years as far as where exactly the routes go and
the addition of more multi-use paths.
If there are any other changes the Committee would like to see please let me know.
Attached Docs: - Snow and Ice Policy from 2014
- Map of sidewalks and paths currently plowed by the Village
- Email from resident along Fuller St regarding Village
removing snow from the sidewalk
______________________________________________________________________
Committee Action: - Topic has been discussed previously
Fiscal Impact: - TBD, if the Village is to take on more sidewalks that would
equate to more staff time and possibly more equipment
_______________ ___________________________________________________________
Recommendation: - Staff recommends updating the policy to reflect current
roads and routes. Then is seeking any additional feedback
the committee may have.
Recommended Language for Official Action
I move to ______________________________
____________________________________________________________________
Additional action:
Sec 70.112 Cleaning Of Sidewalks
The owner of property or the party in possession of the property abutting on any sidewalk shall, without
notice and at all times, keep such abutting sidewalk clean and free from debris, dirt, sweepings,
obstructions and clear of snow and ice and shall not deposit or place any sweepings or debris or other
foreign matter upon the sidewalk, or in the street. Snow and ice shall be removed within 48 hours. If
any owner shall fail or neglect to keep any sidewalk free of debris, dirt, sweepings, obstructions, snow
or ice, the Village may proceed to clear such sidewalk and shall charge the expense, as defined by the
Village Board in the village schedule of fees, thereof as a special tax against the premises to be
collected as other taxes on real estate. The Village may, but shall not be required to, give notice to the
owners of the property before providing for the Village to clear such walks.
(Code 1982, § 8.05, Ord. of 5-24-2007)
HISTORY
Amended by Ord. Chapter 79 Cleaning of Sidewalks Sec 70.112 on 5/24/2007
Amended by Ord. 15-027 on 11/18/2015
From: jjjhrj111@aol.com
To: Michael Wodalski
Subject: Snow Plowing by Village of Weston
Date: Tuesday, October 6, 2026 3:24:29 PM
Hi Michael & Board of Trustees, my Husband & I are requesting that the Village plows the
snow from Ross Avenue to High Ridge Circle on the West side of our home. I have had a
number of discussions with Michael on the matter, however was told he needed to present to
the Board. John & I live at 5700 High Ridge Circle & have been residents in the Village for 30
plus years. In addition, I ran a business in Weston for over 34 years, We have no sidewalk in
the front of our home currently. Michael tells us we are required to plow the sidewalk. We
never had a side walk for over 30 years on Fuller.
I plowed this past Winter, as my Husband John has been disabled for over 40 plus years. This
is not a safe situation, nor happy about it. Our road High Ridge Circle in one of the last roads
to be plowed. Ross & Fuller is plowed early morning. I try to get the sidewalk cleared early
morning , before packed down from people walking. To accomplish this, my choices are if not
plowed go onto the black top road on High Ridge & plow down to Fuller. If High Ridge
plowed, pull blower backwards down High Ridge to Fuller as can't run blower due to gravel. .
This intersection has a stop sign on High Ridge where all the traffic from subdivision comes
through. If our home faced Fuller , I could understand it would be our responsibility, Our
home & the Anderson's are the only ones that do not face Fuller, everyone else does.
I would like to know why the Village plows the sidewalk on Mesker Street? I have saw them
plow numerous times Mesker Street that intersects with Lee Avenue. This is the exact
situation as we have, duplex faces Lee Avenue. Why are the owner's & business's not
responsible? My business was located on Schofield Avenue & this was also plowed by the
Village ,
We are hoping you would review this matter & consider plowing this section of sidewalk. The
Village plows all along Ross Avenue behind our subdivision BUT stops at Fuller Street.
Looking forward to hearing back from you on this situation,
Sincerely, Holly & John Jorgensen
Lizzard Sidewalk
Snow Removal
Map Date:
Adoption Date (Village): N/A
Map by the Village of Weston Public Works, Utilities,
& Technology Services Department
12/13/2022
Village of Weston
Marathon County, Wisconsin
ä ä
JARP ST
BROOK CT
X
ALAN LN
¬«29
MERIDIAN AV
SANDY LN
£¤51
£¤51
FULLER ST
¬«29
BARCLAY WAY
X
CAM
P PHILLIPS RD
RIVER BEND RD
SCHOFIELD AV
SCHOFIELD AV
WESTON AV
COMMUNITY CENTER DR
BIRCH ST
ROSS AV
M
ESKER ST
ALDERSON ST
VOLKM
AN ST
µ
0 0.5 10.25 Miles
Legend
ä Lift Station Needing Lizard
Lizard (Sidewalk Removal)
Road Centerlines
Village OF WESTON
SNOW AND ICE CONTROL POLICY
Keith Donner, P.E. Michael Wodalski, P.E.
Director of Public Works Deputy Director of Public Works
March 3, 2014
Revised:
Revised:
INTRODUCTION
Due to its geographic location, the Village of Weston is subject to freezing rain, ice and snow anytime during the fall,
winter, and spring months; a.k.a. winter precipitation events. Normally, winter storms can be expected during the
months of November thru April. The Village of Weston's Public Works Department is responsible for keeping
vehicular and pedestrian traffic moving safely on the Village of Weston’s approximately 260 lane miles of streets, as
well as the approximate 30 lane miles of streets in the Town of Weston which the Village is currently contracted to
maintain.
The purpose of this policy is to articulate the procedures and policies for the maintenance of public areas in response
to winter precipitation events which create snow and ice related conditions in the Village of Weston. This policy
replaces all prior written or unwritten policies regarding winter precipitation response and/or snow and ice control.
This policy does not affect or override existing ordinances or laws pertaining to sidewalks, parking, or other public
areas. The reference to winter precipitation events is meant to interchangeably apply to snow and ice control as it is
used in this policy or elsewhere in related documents.
The intent of establishing a snow and ice control policy is to provide a uniform understanding of the priorities and
procedures used to respond to winter precipitation events which create snow and ice related conditions. Each winter
precipitation event presents unique challenges and since there is always the potential for unforeseen circumstances,
such as equipment breakdowns and infinitely variable environmental conditions, the time required to reach
completion for each winter precipitation event will also vary. It is not possible, nor is it the intent, for this policy to
prescribe, in advance, time constraints within which a level of completeness is to be achieved by the Department in
response to any particular winter precipitation event or the resulting snow and ice conditions.
WINTER PRECIPITATION/SNOW AND ICE CONTROL RESPONSIBILITY
The Village of Weston Public Works Department is responsible for approximately 290 lane miles of streets in the
Village and Town of Weston plus other public areas during winter precipitation events. The Department has divided
the Village into six areas or six plowing routes for assigning response resources. Each of the six areas contains a
mixture of highest priority (priority A Routes) plowing and sanding/salting routes and other lower priority Village
streets. Marathon County is responsible for the maintenance of the main travel lanes of CTH X/Camp Phillips Road,
CTH J, CTH N, and Business Highway 51 within the corporate limits of the Village and Town of Weston.
EVENT RESPONSE STRATEGY
The allocation of resources and tactics employed by the Department in responding to a winter precipitation event and
the overall time taken to respond to an event is dependent on many factors that vary for each event. As with any
response to an event involving unpredictable conditions there is judgment applied to the allocation of resources.
However, the prioritization for responding to a winter precipitation event is further described in this policy.
Planning and preparing for each snow and ice control project is made difficult by the uniqueness of each storm. No
two storms are ever identical. Factors such as rate of snowfall, moisture content, accumulation, temperature, time of
day and wind velocity determine the uniqueness of each storm. The Village’s snow and ice control program must be
definite enough in nature to establish systematic procedures for responding to any snow and ice control event, while
being flexible enough to accommodate the unique aspects of each storm. Many factors affect the impact of a storm
on the community.
During most storms the greater the snow accumulation the greater the problems, particularly in areas where snow
must eventually be hauled away. A storm during high traffic times is more difficult to clear than the same storm
during a weekend. High winds will cause streets to fill up quickly again with drifted snow requiring additional effort
on the part of the Public Works Department. The temperature at the time of a storm will also affect conditions. Snow
falling on warm pavement will disappear with little effort. But, a moderate storm, along with a prolonged sub-
freezing period, will greatly increase the required removal effort. Also, light, dry snows handle more easily than
heavy, wet snows.
Receiving and analyzing weather information is probably the most critical link for a successful snow and ice control
program. Making a decision at the correct time is vital to the success or failure of the total operation. At the present
time, the Public Works Department depends on television forecasts and internet weather service to help with storm
control decisions.
Determination of the Need for Response
The Street Operations Crew Leader assigned to the on-call responsibility is designated by the Director of Public
Works as the first responder for a winter precipitation event. This first responder is given the authority to
determine the proper allocation of resources to a snow and ice control event. The Village President or Village
Administrator may also direct the Public Works Department to commence winter maintenance operations.
Allocation of resources decisions will involve judgment as to whether to respond, when to respond, and what
level of effort is needed.
Dependent on the conditions resulting from a winter precipitation event, the response of the Public Works
Department varies. Not every winter precipitation event presents the same conditions, or requires identical
response. Generally some type of response will be necessary if streets become snow covered and/or slippery.
To assist in making the judgments as to strategy to use in a particular event, the first responder should rely on
current weather conditions, weather forecasts, and reports from local law enforcement patrol officers. Factors to
be considered include type and amount of precipitation (current and forecast), air temperature (current and
forecast), pavement temperature, humidity, wind, and time of day.
Determination of Resource Allocation
The intensity of response required for snow and ice control is dependent on the amount of precipitation which
occurs. To help the public better understand how resources are allocated streets are given prioritization, or
hierarchy, for clearance, and precipitation events are categorized.
Prioritization of Response
Guidelines for prioritizing the allocation of resources have been established in advance of event response.
Not every street is viewed or treated the same way. Plow routes include a mixture and balance of streets with
different levels of priority for clearance. Plow routes also may vary in size dependent on available resources.
Priority A - streets are Village and Town thoroughfare streets which are those streets in the urbanized area
classified system and other local streets of significance due to their role in providing access to St. Clare’s
Hospital, schools, and commercial districts. Included are all or parts of the following streets:
Village of Weston:
Alderson St Alta Verde St Barbican Ave Bayberry St Birch St Callon Ave
Commerce Dr Community
Center Dr
Concord Ave Corozalla Ave Cranberry Blvd Eau Claire Ave
Enterprise Way Foothill Ave Fox St Fuller St Franciscan Way Highland Ave
Heeren St. Howland Ave Isaiah St Janice Ave Jelinek St Machmueller St
McIntyre St Mesker St Ministry Pkwy Neupert Ave Normandy St Old Costa Rd
Progress Way Quentin St River Bend Rd Ross Ave Ryan St. Sandy Ln
Schofield Ave Shorey Ave Sternberg Ave Stone Ridge Dr Teagan Ln Volkman St
Von Kanel St Weston Ave Westview Blvd Woodland Dr
Town of Weston:
Gusman Rd Hawthorne Ln River Rd Ross Ave Kramer Ln Kersten Rd
Lester St
Priority B – streets are the remaining Village and Town streets which are lesser-traveled collector and residential
streets.
Priority C - streets and public spaces include cul-de-sacs, public sidewalks, parking lots, wells, sewage pumping
stations, and parks maintained by the Department of Public Works. These streets are normally treated only after
priority one and two streets are satisfactorily completed or have sufficient resources available and/or assigned to
address.
The prioritization of streets been determined in such a manner that most residences are no more than four
blocks from a Priority A street.
Event Categorization
Level 1 – is the occurrence of a snowfall of up to 1 ¼ inches. For a Level 1 event only Priority A streets will be
cleared or otherwise treated.
Level 2 – is the occurrence of a snowfall of between 1 ¼ to 3 inches. For a Level 2 event, Priority A and
Priority B streets will be cleared or otherwise treated during unscheduled time. Priority C areas will only be
cleared or otherwise treated during normally scheduled work periods and after precipitation has ceased.
Level 3 – is the occurrence of a snowfall of greater than 3 inches in depth. For a Level 3 event, clearance or
other treatment is required regardless of the timing of the event.
Response levels may vary depending on whether the snowfall is combined with freezing and icing conditions
which would make the public ways difficult to travel.
Precipitation other than accumulating snow, such as freezing rain, will require the exercise of judgment as to
the necessary treatment(s) to apply, if any, such as salt, sand, etc.
EMERGENCY SERVICES CONSIDERATIONS
During snow and ice conditions, emergency calls from the Police and Fire Departments regarding accidents, medical
or other emergency situations are given top priority for whatever assets are needed to support their emergency
response efforts. Public Works Department personnel do not respond to unverified "emergency" requests
direct from the public. Public Works employees will not pull or tow stranded motorists, but will notify the
proper authorities that can be of assistance.
OTHER CONSIDERATIONS
Any complaints regarding snow and ice control measures shall be forwarded to the Public Works Department during
normal work hours of 7:30 a.m. to 5:00p.m. on weekdays. Phone number: (715) 359-6114.
A map showing priority routes is available at the office of the Director of Public Works located in the Municipal
Center.
The Village will not salt, sand or plow private property and cannot shovel out ridges in driveways caused by the
snowplows. Snow removal from driveways and sidewalks is the property owners' responsibility.
MAILBOXES
Operators are instructed to be cautious around mailboxes. In most cases a properly installed mailbox will permit a
snowplow to clear the snow underneath it. Most cases of damaged mailboxes are caused by heavy snow hitting the
box. Payment for the replacement of mailboxes by the Village of Weston shall be limited to a $25.00 payment.
Payment shall be made upon confirmation by the Public Works Director or his designee that the mailbox was
actually hit or damaged by a snow plow and upon receipt of an invoice from the property owner as proof that a
replacement mailbox was purchased. The Village of Weston will not supply mailboxes or posts. Owners are
responsible for installation of replacement mailboxes. Village employees will not replace mailboxes.
PERSONNEL AVAILABLE FOR WINTER MAINTENANCE OPERATIONS
All full time employees of the Street, Parks and Utilities Departments are expected to be available from November
1st to April 1st to assist in snow and ice removal operations, subject to departmental policies on paid time off.
Employees who know that they will be unable to respond to a snow emergency shall make the Director of Public
Works, or the street operations first responder aware of the situation so that any necessary modifications in resource
acquisition and allocation can be anticipated.
OVERTIME POLICY
The determination of when to use overtime in the removal of snow or ice shall be made by one of the following:
Director of Public Works or Street Dept. Supervisor
Village Administrator
Village President
The need for overtime will be dependent on the severity of a storm. Maintenance of most Priority C areas shall not
require overtime, or unscheduled work. The following degree of maintenance may require overtime:
Priority A: Streets should be kept passable at all times if possible.
Priority B: Streets should be open to travel by plowing, salting or sanding within 12 hours after a storm.
In the following sections the time allotted for removal of a storm shall include Saturdays, Sundays or holidays which
may require overtime.
EQUIPMENT AVAILABLE FOR WINTER MAINTENANCE OPERATIONS
6 - Trucks with plows, wings and spreaders.
2 - End loaders (with a plow option)
1 - Motor Grader
4 - One-Ton trucks w/plows
1 – Pickup truck with a plow
1 – Multi-purpose tractor with snow blower attachment.
PLOWING
Plowing consists of moving snow to either side of a street or public area after which it may be loaded and trucked to
a remote area. Plowing should be accomplished according to designated routes and priorities.
Clearance Goals
Priority A Streets: Two lanes of traffic open within 4 hours of response start and thereafter.
Priority B Streets: Two lanes of traffic open within 12 hours after a storm ends and thereafter.
Priority C Streets: Open to travel within 24 hours after a storm ends and thereafter.
In severe weather conditions where there is danger to operators or it is not practical or cost effective to
Continue plowing; snow and ice control operations may be suspended.
PRIVATE PLOWING
No snow or ice removed from private property shall be deposited in any public way or areas expected to be cleared
by personnel from the Village of Weston. This would include any of the following, which are prohibited:
Pushing snow or ice across a street or walk.
Depositing snow or ice on a public way, where expected to be maintained for pedestrian or vehicular traffic.
The blowing of snow or ice onto vehicle or pedestrian travel areas.
Any of the above are dangerous and could cause injury or accidents. Violation of any of the above may result in a
forfeiture action against the property owner, resulting in a fine. Removal may also be made by the Village, through
notification of the property owner, with a penalty plus actual removal costs being assessed against the property.
SALTING
Salting shall provide placement of sodium chloride upon a snow or ice surface to remove accumulation when
temperatures are below freezing. Salt shall be used only when absolutely necessary as determined by the Director of
Public Works or his designee in areas of high volume traffic or dangerous conditions (most salt is applied at hills,
curves and intersections). Salt may have adverse side effects on the environment and shall be used with this in mind.
Salt is not effective below a certain temperature (20°F) adjusted by the amount of available sunlight. With favorable
temperatures, salt can be used to melt up to 2" of snow and will prevent the bonding of compacted snow to
pavements resulting in cleaner plowing jobs. Due to the expense the Village will not apply salt to lesser traveled
collector and residential streets, unless severe icing requires its use.
SALT AND SAND MIXTURE
Sanding is done to provide a traction surface on packed snow or ice and shall be applied only in areas of high traffic
movement or unsafe areas as determined by the Director of Public Works or his designee. Since the salt/sand mixture
contains only 5-15% salt, to keep the sand from freezing, sanding is not done to try and melt snow or ice. Sanding of
streets can cause a buildup of sand in storm sewers and points of discharge, which could require additional
maintenance or environmental concerns. Therefore sand shall only be used as absolutely needed. Sand and salt
mixture is available to Village residents at the Village garage.
SNOW REMOVAL
The existing snow disposal operations include the use of a front-end loader or a snow blower to load snow into dump
trucks. Snow is hauled to various sites throughout the Village. Snow is removed from areas as needed and as time
allows throughout the winter. Snow is removed in order to create room for future snow storage throughout the winter
and in the spring time snow removal helps reduce the amount of snow melt and associated flooding experienced in a
specific area.
PARKING:
For the purpose of this section parking is defined to mean permitting a vehicle to remain unattended, but shall not
include the temporary stopping of a vehicle by a doctor on an emergency call, police, fire or other emergency
vehicles, or business vehicles being used for normal delivery or pickups.
WINTER PARKING REGULATIONS:
Sec. 82.107 (a) Village of Weston, Code of Ordinances.
When signs have been erected at or reasonably near the village limits as provided in Wis. Stats. § 349.13, no person
shall park any vehicle for a period of time longer than 30
minutes between the hours of 2:00 a.m. and 6:00 a.m. of any day, from October 31 to May 1, except physicians or
surgeons, when parking is reasonably necessary on emergency calls.
SNOW EMERGENCY
A snow emergency shall exist whenever there shall be an accumulation of four (4) or more inches of snow during a
twenty-four (24) hour period and such accumulation interferes with the safe and efficient movement of traffic or
impairs the ability of emergency vehicles to travel safely over the streets of the Village of Weston. Such emergency
shall continue in effect for 24 hours after snow has ceased to fall, or until such time as the snow has been removed
from the streets or highways within the Village, or until the Director of Public Works or his designee rescind the
snow emergency.
DECLARATION OF SNOW EMERGENCY:
Sec. 82.107 (C)(1) Village of Weston, Code of Ordinances.
A snow emergency may be declared to exist by the Director of Public Works or his designee, or by the Chief of
Police by giving notice to the news media. A declaration shall be a service aid only and not a duty on the part of said
officials.
SNOW EMERGENCY PARKING REGULATIONS:
Sec. 82.107 (C) Village of Weston, Code of Ordinances.
After notice is given, during the period of such snow removal emergency as so declared, no vehicle shall be parked,
stopped or left standing on any public street or alley within the village.
Approved by the Weston Village Board on: Month Date, 2014
SNOW PLOWING PRIORITY ROUTES
Subject to mechanical condition of equipment, snow plowing of Priority A streets are currently assigned as
follows:
ROUTE 9 TRUCK #9
Jelinek Ave from BUS 51 to Birch St Normandy St from Schofield Ave to Jelinek Ave
Volkman St from STH 29 to Priebe St Alderson St from STH 29 to Schofield Ave
Birch St from Community Center Dr to Schofield Ave Community Center Drive from Birch to CTH X
Barbican Ave from CTH X to Von Kanel St Neupert Ave from BUS 51 to Alderson St
ROUTE 10 TRUCK #10
Ross Ave from Metro Center Dr to Kramer Rd Kramer Rd from Ross to Kersten
Kersten from Kramer to CTH N Northwestern Ave from CTH X to City of Wausau
Alderson St from Ross Ave to Mallard Ct Eau Claire Ave from Alderson to CTH X
Bayberry from Ross to Concord Concord Ave from Bayberry to CTH X
ROUTE 17 TRUCK #17
Schofield Ave (Entire length with trucks 29 & 69) Sternberg Ave from Birch to Mesker St
Mesker St from Ross to Schofield Ave Janice from Mesker to Fuller
Fuller from Ross to Schofield Ave Corozalla from Ross to Mesker
Fox St from Norma to Schofield Ave
ROUTE 29 TRUCK #29
Schofield Ave (Entire length with trucks 17 & 69) Weston Ave from CTH X to Ringle Line
Shorey Ave from CTH X to Ryan St Ryan St from Shorey Ave to Schofield Ave
Howland Ave from CTH X to Woodland Dr Woodland Dr. from Howland Ave to Shorey Ave
Heeren St from Nick to Weston Ave??? Progress Way
Commerce Drive Enterprise Way
Zinser St from Schofield Ave to STH 29
ROUTE 60 TRUCK #60
Alderson St from Shorey Ave to Howland Ave Weston Ave from Birch St to CTH X
Hospital Area between STH 29 and Weston
Ave(Ministry Pky, Cranberry Blvd, Stone Ridge Dr.,
Westview Blvd, Franciscan Way, Birch St)
East Jelinek from CTH X to Municipal St
Mesker St from Schofield Ave to E Jelinek
Von Kanel from Barbican to E Jelinek
ROUTE 69 TRUCK #69
Schofield Ave (Entire length with trucks 17 & 29) Sandy Ln from Ross Ave to Canoe St
Canoe St from Sandy Lane to Termini Isaiah St from Sandy Ln to Walleye Dr.
Walleye from Isiah to Creel Creel from Walleye to Quentin
Quentin from Portage to Kramer Portage from Canoe to Quentin
Michael Dr from Alex to Cheryl
ASSIGNED PLOWING ROUTES
ROUTE 1 TRUCK #9
All streets: East of Volkman St., North of STH 29, South of Schofield Ave and West of Birch St. Community Center
Dr. and Barbican Ave are also part of the route.
ROUTE 2 TRUCK #10
All streets including Ross Avenue North of Ross Avenue and West of the Eau Claire River, all streets off of
Northwestern Avenue, and all roads in the Town of Weston North of Gusman Rd. All streets within the Powers
Subdivision are part of this route as well.
ROUTE 3 TRUCK #17
All streets located between Ross Ave and Schofield Ave from the Western Village Border to and including streets
from Fuller St to the Eau Claire River.
ROUTE 4 TRUCK #29
All streets south of STH 29 and East of Camp Phillips Road/CTH X. As well as all streets South of Schofield Ave
and East of Municipal Street.
ROUTE 5 TRUCK #60
All streets South of STH 29 and West of Camp Phillips Road/CTH X. As well as all streets between Schofield Ave
and STH 29 from Birch St to Municipal St, excluding Community Center Dr. and Barbican Ave.
ROUTE 6 TRUCK #69
All Village Streets located North of the Eau Claire River except for the Powers Subdivision, and all Town Roads
south of Gusman Rd. Additionally all Village Streets East of Fuller St. and North of Schofield Ave.
Drivers will not deviate from their assigned routes until that route is completed or ordered to do otherwise by the
Director of Public Works, Street Superintendent or the Village Administrator. Upon completion of their assigned
routes drivers will check in with the Director of Public Works or the Street Superintendent for assignment to help in
another area. No driver is excused from duty until the DPW or Street Superintendent is notified and all streets are
cleared.
VILLAGE MAINTAINED SIDEWALKS and MULTI-USE PATHS
Schofield Ave: Ryan St to BUS 51
BUS 51: Jelinek Ave to Schofield Ave.
Camp Phillips/CTH X: Howland Ave to Northwestern Ave
Birch St: Weston Ave to Community Center Dr.
Weston Ave: Camp Phillips/CTH X to Birch St.
Kennedy Park: (Bounded by Alderson St, Neupert Ave, Alta Verde St, and Jelinek Ave)
Public Safety Building: (Mesker St)
REQUEST FOR CONSIDERATION
REQUEST FOR CONSIDERATION
PAGES 1 OF 2
Public Mtg/Date:
Public Works Committee – 11/9/2026
Description:
CR-X and Sternberg Ave Intersection Engineering
Design Services
From:
Michael Wodalski, Director of Public Works
Question: Does the Public Works Committee Recommend the
Village Board approve an Engineering Design Contract
with SEH for the CR-X and Sternberg Ave intersection
in an amount of $43,500?
Background
The Village has partnered with the Marathon County Highway Department to reconstruct CR-X
and the Ross Ave intersection from Sternberg Ave to north of Concord Ave. The project limits
at Sternberg Ave were just north of the Sternberg intersection and the main part of the project is
the Ross Ave and CR-X intersection improvements. This project currently has an STP-Urban
grant through the Wisconsin Department of Transportation (WDOT) in the amount of
$2,352,000.
The Village then submitted a Transportation Alternatives Project (TAP) grant to the WDOT for
improvements to the Sternberg Ave and CR-X intersection as part of the Weston Elementary
School Safe Routes to School Plan. The Village was informed in September 2026 that we did
not receive the TAP grant funding for this project.
Weston can still proceed with the intersection improvements as part of the CR-X project, just all
associated costs will be the Village’s. The purpose of the intersection improvements at
Sternberg Ave is to improve access to the school and crossing of CR-X at this location. The
design would create a refuge island on the roadway and also provide warning lights. The
design proposal is from SEH who is the design engineer currently hired for the CR-X and Ross
Ave project.
SEH would continue the design south of Sternberg to tie into the new roadway project. There is
some additional cost on the front end to have this design included with the current WisDOT
funded project, however, there should be substantial construction savings by having this project
included right away. If this intersection improvement is not included as part of the upcoming
project in 2028, it would like wait until the section of CR-X is reconstructed between Schofield
Ave and Sternberg Ave which currently does not have a timeline.
This intersection improvement has been identified in the following plans:
- Village of Weston Comprehensive Plan
- Weston Elementary School Safe Routes to School Plan
- Village of Weston Bicycle and Pedestrian Plan
- Wausau MPO Bike and Pedestrian Plan
Attached Docs: - Proposal from SEH
- Safe Routes to School Plan
REQUEST FOR CONSIDERATION
REQUEST FOR CONSIDERATION
PAGES 2 OF 2
Committee Action: - Committee previously approved the ongoing efforts for the
CR-X and Ross Ave Project
Fiscal Impact: - Design is $43,500, construction cost is likely around
$200,000
_______________ ___________________________________________________________
Recommendation: Staff recommends awarding the contract to SEH to
incorporate the Sternberg Ave intersection improvements into
the CR-X and Ross Ave Project slated for construction in 2028
Recommended Language for Official Action
I Move to recommend ___________________.
Or, Something else
____________________________________________________________________
Additional action:
Short Elliott Hendrickson Inc. Letter Agreement - 1 Village of Weston
Affirmative Action, Equal Opportunity Employer (Rev. 05.29.25)
Agreement for Professional Services
This Agreement is effective as of November 1, 2026, between Village of Weston (Client) and Short Elliott
Hendrickson Inc. (Consultant).
This Agreement authorizes and describes the scope, schedule, and payment conditions for Consultant’s work on
the Project described as: CTH X and Sternberg Ave
Client’s Authorized Representative: Michael Wodalski
Address: 4747 Camp Phillips Rd, Weston, Wisconsin 54476, United States
Telephone: 715-359-6114 Email: mwodalski@westonwi.gov
Project Manager: Brett Hollister
Address: 10 North Bridge Street, Chippewa Falls, Wisconsin 54729
Telephone: 715.720.6253 Email: bhollister@sehinc.com
Scope: The Basic Services to be provided by Consultant as set forth herein are provided subject to the attached
General Conditions of the Agreement for Professional Services (General Conditions Rev. 01.01.26), which is
incorporated by reference herein and subject to Exhibits attached to this Agreement.
Consultant will update the roadway design and supporting documentation to extend the project limits south of the
CTH X/Sternberg Ave intersection and reconfigure the intersection to incorporate pedestrian accommodations
identified in the safe routes to school evaluation. Services include report updates, environmental documentation,
agency coordination, survey, plat preparation, roadway and drainage design, and RRFB plans described below.
Attached exhibit depicts proposed work.
1) Reports
a. Design Study Report (DSR): Update design details to reflect the extended project limits and
intersection reconfiguration.
b. Stormwater Drainage Water Quality Report: Update design details to reflect the extended project
limits and intersection reconfiguration.
2) Environmental Documentation
a. Categorical Exclusion Checklist
i. Update the environmental document to capture the extended project limits and
intersection reconfiguration.
b. Hazardous Materials
i. Update hazardous materials documentation to address the extended project limits and
intersection reconfiguration.
c. Section 106 Documentation
i. Update the screening (DT1030 form) and full evaluation (DT 1635 form) to address the
extended project limits and intersection reconfiguration, and submit both to the WisDOT
Cultural Resources Team for approval.
3) Agency Coordination
a. Update outside-agency screening tools to address the extended project limits and intersection
reconfiguration.
4) Survey
a. Perform topographic survey within the extended project limits and intersection reconfiguration
area.
Short Elliott Hendrickson Inc. Letter Agreement - 2 Village of Weston
(Rev. 05.29.25)
5) Plat
a. Prepare one additional Transportation Project Plat (TPP) sheet for parcels affected by the
extended project limits and intersection reconfiguration.
b. Order title reports and necessary title updates to support preparation of the TPP.
6) Design
a. Revise the roadway design for the extended project limits and reconfigure the CTH X/Sternberg
Ave intersection to accommodate a uniform widened median, shifted equally to west and east.
b. Design a raised pedestrian refuge island on the north leg of the intersection.
c. Design four additional curb ramps.
d. Evaluate and revise detour concepts to reflect the extended project limits and intersection
reconfiguration.
e. Design storm sewer modifications at the intersection, including relocation of four inlets and
associated storm sewer pipe.
7) Rectangular Rapid Flashing Beacon (RRFB)
a. Design and prepare plan sheets for one wired RRFB located along the north leg of CTH X .
Schedule:
1) The schedule of this project will follow and is tied to the WisDOT project 6659-02-01.
Payment:
The lump sum fee is $43,500.00 including expenses and equipment. The payment method, basis, frequency and
other special conditions are set forth in attached Exhibit A-2.
This Agreement for Professional Services, attached General Conditions, Exhibits and any Attachments
(collectively referred to as the “Agreement”) supersedes all prior contemporaneous oral or written agreements and
represents the entire understanding between Client and Consultant with respect to the services to be provided by
Consultant hereunder. In the event of a conflict between the documents, this document and the attached General
Conditions shall take precedence over all other Exhibits unless noted below under “Other Terms and Conditions” .
The Agreement for Professional Services and the General Conditions (including scope, schedule, fee and
signatures) shall take precedence over attached Exhibits. This Agreement may not be amended except by written
agreement signed by the authorized representatives of each party.
Other Terms and Conditions: Other or additional terms contrary to the General Conditions that apply solely to
this project as specifically agreed to by signature of the Parties and set forth herein: None.
Short Elliott Hendrickson Inc. Village of Weston
By: [[DocuSignSignature_1]] By: [[DocuSignSignature_2]]
Full Name: [[DocuSignFullName_1]] Full Name: [[DocuSignFullName_2]]
Title: [[DocuSignText_Signer1_Text1]] Title: [[DocuSignText_Signer2_Text1]]
Short Elliott Hendrickson Inc. Letter Agreement - 3 Village of Weston
(Rev. 05.29.25)
Exhibit A-2
Payments to Consultant for Services and Expenses Using the Lump Sum Basis Option
The Agreement for Professional Services is amended and supplemented to include the following
agreement of the parties:
A. Lump Sum Basis Option
The Client and Consultant select the Lump Sum Basis for Payment for services provided by Consultant.
During the course of providing its services, Consultant shall be paid monthly based on Consultant’s
estimate of the percentage of the work completed. Necessary expenses and equipment are provided as a
part of Consultant’s services and are included in the initial Lump Sum amount for the agreed upon
Scope of Work. Total payments to Consultant for work covered by the Lump Sum Agreement shall not
exceed the Lump Sum amount without written authorization from the Client.
The Lump Sum amount includes compensation for Consultant’s services and the services of
Consultant’s Consultants, if any for the agreed upon Scope of Work. Appropriate amounts have been
incorporated in the initial Lump Sum to account for labor, overhead, profit, expenses and equipment
charges. The Client agrees to pay for other additional services, equipment, and expenses that may
become necessary by amendment to complete Consultant’s services at their normal charge out rates as
published by Consultant or as available commercially.
B. Expenses Not Included in the Lump Sum
The following items involve expenditures made by Consultant employees or professional consultants on
behalf of the Client and shall be paid for as described in this Agreement
1. Expense of overtime work requiring higher than regular rates, if authorized in advance by the Client.
2. Other special expenses required in connection with the Project.
3. The cost of special consultants or technical services as required. The cost of subconsultant services
shall include actual expenditure plus 10% markup for the cost of administration and insurance.
The Client shall pay Consultant monthly for expenses not included in the Lump Sum amount.
Short Elliott Hendrickson Inc. Letter Agreement - 4 Village of Weston
(Rev. 05.29.25)
Short Elliott Hendrickson Inc. Letter Agreement - 5 Village of Weston
(Rev. 05.29.25)
COUNTY X (CAMP PHILLIPS RD)
STERNBERG AV
STERNBERG AV
COUNTY X (CAMP PHILLIPS RD)
WISDOT/CADDS SHEET 42EHWY:COUNTY:X:\KO\M\MARAC\176840\4-PRELIM-DSGN-RPTS\C3D\00000000\DSGN\EDGELINE\PAVT_TAPER ON SOUTH END 6-FT.DWGFILE NAME : 10/8/2026 7:29 AMPLOT DATE :PLOT BY :DEAN STODOLA
2
PROJECT NO: PLOT NAME :
2
SHEET PLOT SCALE :1 IN:40 FT6659-02-01CTH XMARATHON6-FT LANE SHIFT (NORTHBOUND AND SOUTHBOUND)LAYOUT NAME - Plan 1 IN 40 FT
Physical
Recommendations
:
0 860 1,720430
Feet
This map is neither a legally recorded map nor a survey
and is not intended to be used as one. This drawing is
a compilation of records, information and data used for
reference purposes only. NCWRPC is not responsible for
any inaccuracies herein contained.
Source: WI DNR, WisDOT, NCWRPC, Village of Weston
210 McClellan St., Suite 210, Wausau, WI 54403
715-849-5510 - staff@ncwrpc.org - www.ncwrpc.org
North Central
Wisconsin Regional
Planning Commission
Prepared By:
NCWRPC
Map 6A
Weston Elementary
Legend
Weston Elementary
U.S. Highway
State Highway
Main Roads
Local Roads
15 MPH School Speed Limit
(Includes Higher Fine Zone)
Sidewalk
Bike Lanes
Recommendations
Proposed Sidewalk
"ÿX
TOWERRIDGE PL
HORIZON
CT
FLORLANA
LN
JANICE AV
E JELINEK AV
SCHOFIELD AV
ARROW ST
WESTFAIR
AV
STERNBERG AV
SCHMUTZLER
ST
ACRE
AVZADRA ST
GORDON ST
RANDYJAY ST
CEDAR AV
BIRCHWOOD
LN
LEE AV
JELINEK AV
RIDGE
POINT
CIR
MESKER ST
ROSE
ST
KNAACK
AV
HOLLY
AV
BAYINGTON
AV
QUIRTSANN DR
WALNUT
ST SCOTT ST
DJ
LN
KENNEDY AV
DEERST
CARTER
AV
AUGUSTINE AV
VON
KANEL ST
ABITZST
BIRCH ST
LEDUC
ST
GLAD ST
WEILAND
AV SUNSET STS TIMBER ST
COROZALLA DR
LINDA ST
FOXRUN LN
EAU
CLAIRE AV
JEAN
ELLEN ST
W RAYBELLE DR
MOUNT
VIEW AV
ASPEN ST
RUDOLPHDR
PRAIRIE ST
NORMA
AV
FELCH DR
CAMP
PHILLIPS RD
CONCORD AV
E RAYBELLE DR
BERNARD
AV
ROSS AVBARCLAY
WAY
WESTON
PINES LN
WINDING
RIDGE WAY
S GORDON
ST
EDWARD ST
HORIZON
CT
W RAYBELLE
DR
FLORLANA
LN
ROSS AV
RIVERFRONT PL
JEAN ELLEN ST
COLLEEN
AV
STERNBERG AV
E JELINEK AV
SUNSET ST
SCHOFIELD AV
VON KANEL STACRE AV
ZADRA ST
WEILAND AV
GORDON ST
CEDAR AV
BIRC
HWO
O
D L
N
RODNEY ST
LEE AVHOLLY AV
S TIMBER ST
KIRK ST
RAEJAMES ST
JELINEK
AV
KENNEDY AV
ROSE ST
KNAACK
AV
BAYINGTON
AV
N KRUEGER
AV
S KRUEGER AV
Q
UIR
TSANN DR
COROZALLA DR
RICHFLEX ST
HICKORY ST
WALNUT ST
DJLN
DEER ST
WESTFAIR AV
CARTER AV
ABITZ ST
BIRCH
ST
LEDUC ST
GLAD ST
MESKER ST
ARROW ST
E BERNARD AV
CRESTWOOD DR
FOX RUNLN
EAU CLAIRE AV
MOUNT VIEW AV
AUGUSTINE AV
ASPEN ST
RUDOLPH DR
PRAIRIE
ST
NORMA AV
FELCH DR
CAMP PHILLIPS RD
JANICE AV
CONCORD AV
LINDAST
SCOTTST
E RAYBELLE DR
BERNARD AV
Camp Phillips Rd & Ross Ave Intersection
Continue painting existing high visibility crosswalks and Stop lines as is.
Re-paint regular crosswalks as high visibility crosswalks, and move Stop lines for
re-painted crosswalks to same distance as existing high visibility crosswalks.
*
*
Camp Phillips Rd
Paint "SCHOOL X-ING" at least 150-feet in advance of the Sternberg Ave
school crosswalk.
Add Higher Fines signs to School Zone signs.
Install School Zone Ends and Speed Limit signs on the same post at the
end of School Zone.
Paint "shark teeth" yield triangles 30-feet in advance of Sternberg Ave
school crosswalk; and install Yield To Pedestrians School paddle sign on
road centerline at "shark teeth".
*
*
*
*
Camp Phillips Rd
Add a pair of double sided Rectangular Rapid Flash Beacons
(RRFBs), or Pedestrian Hybrid Beacons, School Crossing
signs on the north side of Sternberg Ave school crosswalk,
and possibly add a pedestrian refuge island, and possibly
reduce curb radii on all 4 corners.
At Sternberg Ave intersection, re-paint all crosswalks
and Stop lines exactly the same as the high visibility crosswalks
and Stop lines at Ross Ave and Camp Phillips Rd.
Install a second street light on southeast corner of Sternberg
Ave & Camp Phillips Rd, facing west.
*
*
*
See Chapter 3 for
all recommendations.
Weston Elementary
Safe Routes To School
REQUEST FOR CONSIDERATION
REQUEST FOR CONSIDERATION
PAGES 1 OF 2
Public Mtg/Date:
Public Works – 11/9/2026
Description:
Intergovernmental Agreement with the Village of
Rothschild and City of Schofield for construction of
the WisDOT Storm Water Pond
From:
Michael Wodalski, PE - Director of Public Works
Question: Should the Public Works Committee Recommend the
Village Board Approve the Agreement with the Village
of Rothschild and City of Schofield for the
construction of the WisDOT Storm Water Pond?
Background
Rothschild, Schofield and Weston are all regulated by the Wisconsin Department of
Natural Resources (WDNR) for storm water discharges within the Wisconsin River
Basin. As part of our permit requirements, our communities need to reduce the amount
of phosphorus entering the waters of the State. All three communities have worked with
Strand Associates to model their storm water systems and have identified the Business
51 and State Highway 29 Interchange (WDOT Pond) location to be an ideal location for
a storm water basin as it catches the most upstream storm water and would provide
treatment prior to discharging to the Wisconsin River just to the west of the interchange.
In October of 2024 our communities entered into an Intergovernmental Agreement for
design of a storm water pond. After design, the next step is to move forward with
construction of the pond. To date the communities have received one grant in the
amount of $150,000 to be used towards the project. Additionally, the Village of Weston
is in the process of submitting a Clean Water Fund Loan application to the Department
of Natural Resources (DNR) to obtain a low interest loan for the project.
As noted above the pond project is a requirement of the DNR’s requirements for Total
Phosphorus removal within the Wisconsin River Basin. As part of the DNR process for
compliance, the Village of Weston needed to submit an Implementation Plan outlining
how Weston was going to meet the Phosphorus removal requirements. The first major
project was this storm pond which was projected to be in service in 2026 and remove
122.4 pounds of phosphorus. Through the design phase and now with DNR
concurrence, the storm water model is showing the pond will remove 225.8 pounds of
phosphorus which is just over 100 pounds more than initially estimated.
Based on the more detailed modeling throughout the design, the attached agreement is
allocating costs based on the pounds of phosphorus being removed by the pond. This
comes out to be:
- 89.78% WESTON (225.8 lbs)
- 8.75% ROTHSCHILD (22.0 lbs)
- 1.47% SCHOFIELD (3.7 lbs)
REQUEST FOR CONSIDERATION
REQUEST FOR CONSIDERATION
PAGES 2 OF 2
This agreement is for the construction of the pond and will supersede the existing
agreement for design.
Attached Docs: - Draft Agreement for Construction
- Previously approved Design Agreement
- Pond Description and preliminary Design
- Village of Weston Implementation Plan Documents
______________________________________________________________________
Committee Action: - Committee has previously endorsed the project
Fiscal Impact: - The project has a total estimated cost of ~$3,000,000
_______________ ___________________________________________________________
Recommendation: Staff recommends approving the agreement.
Recommended Language for Official Action
I Move to Recommend the Village Board approve the agreement with the Village
of Rothschild and City of Schofield for the construction of the WisDOT Storm
Water Pond.
Or, Something else
____________________________________________________________________
Additional action:
Page 1 of 3
INTERGOVERNMENTAL AGREEMENT
BETWEEN THE VILLAGES OF ROTHSCHILD AND WESTON AND CITY OF
SCHOFIELD
MARATHON COUNTY, WI
THIS AGREEMENT dated this _______day of _____ 2026, is by and between the
VILLAGE OF ROTHSCHILD, a Wisconsin municipal corporation of Marathon County,
Wisconsin (herein "ROTHSCHILD"), the VILLAGE OF WESTON, a Wisconsin municipal
corporation of Marathon County, Wisconsin (herein " WESTON") and the CITY OF
SCHOFIELD, a Wisconsin municipal corporation of Marathon County, Wisconsin (herein
"SCHOFIELD"), collectively referred to herein as “the MUNICIPALITIES” or singularly “the
MUNICIPALITY”.
Recitals
WHEREAS, the MUNICIPALITIES enter into this Agreement pursuant to the authority of
Wis. Stat. §66.0301;
WHEREAS, the MUNICIPALITIES are categorized as Municipal Separate Storm Sewer
System (MS4) Communities and hold a Wisconsin Pollutant Discharge Elimination
System (WPDES) Permit; and
WHEREAS, the MUNICIPALITIES are located within the Wisconsin River Basin Total
Maximum Daily Load (TMDL) compliance area; and
WHEREAS, the MUNICIPALITIES are subject to the Total Suspended Solids (TSS) and
Total Phosphorus (TP) wasteload allocations included in the Wisconsin River Basin
TMDL; and
WHEREAS, pursuant to Section 66.0301 of the Wisconsin Statutes, the parties hereto
have agreed to an intergovernmental contract for the purpose of jointly participating in the
WisDOT Right-of-Way Detention Basin Construction project by providing for a plan for
project administration and oversight, the sharing of costs and expenses associated with
the project and providing for a mechanism for billing and payment of project costs.
NOW, THEREFORE, upon the foregoing premise and in consideration of the mutual
covenants hereinafter set forth, and other good and valuable consideration, the receipt
and sufficiency of which is hereby acknowledged, the parties hereby mutually agree as
follows:
1. The construction of the WisDOT Right-of-Way Detention Basin will take place by
the end of th e year 202 8 as long as the MUNICIPALITIES enter into this
construction agreement . The scope of the construction project consists of the
Page 2 of 3
following:
a. Construction and construction oversite of an approximate 2.25 Acre
stormwater basin located within the Business 51/STH 29 interchange,
b. Connection and redirection of any storm water conveyance pipe within the
vicinity of the pond.
2. The MUNICIPALITIES have previously agreed to contract with Strand Associates
for engineering design services and agree to retain Strand Associates for
Construction Engineering Services for a contract price of .
3. For purposes of establishing the method of assigning costs to each community,
the cost apportionment for construction is based on the calculated pounds of Total
Phosphorus (TP) proportionally removed from the proposed basin and is estimated
as follows:
a. 89.78% WESTON (225.8 lbs)
b. 8.75% ROTHSCHILD (22.0 lbs)
c. 1.47% SCHOFIELD (3.7 lbs)
4. Construction will commence once an agreed upon final design as well as a cost
estimate for the project is determined.
5. WESTON will fill the role of project manager to include the following duties:
a. Administration of the engineering services and construction contract to
include approvals of payments and accounting of all costs associated with
the project.
b. Submittal and administration of a Clean Water Fund Loan (CWFL) for the
project.
c. WESTON will invoice ROTHSCHILD and SCHOFIELD for their net share
of invoices for work completed within one (1) month of receiving invoices
from the Contractor and/or Engineer. ROTHSCHILD and SCHOFIELD shall
pay WESTON within thirty (30) days of receipt. Any balances carried
beyond 30 days shall accrue interest at the rate of five percent (5%) per
month retroactive to the billing date until paid in full. Each of the parties
hereto shall have full and complete access t o the other party’s records of
project costs for verification purposes if needed.
6. The recitals contained in the preamble to this agreement shall be and hereby are
incorporated as part of the agreement between the parties. Construction on the
project will com mence no later than July 1, 202 7 and shall be completed by
October 29, 2028. Each of the parties shall cooperate fully with one another and
extend their respective best efforts in completing the project in an expeditious and
Page 3 of 3
timely manner.
7. This agreement represents the entire agreement between the parties and shall not
be amended, changed, or modified except by written agreement signed by each
of the parties hereto.
8. Each party warrants and represents to each other that the execution of this
Agreement by their respective officers or agents has been duly authorized and that
this Agreement, when fully executed, constitutes a valid, binding and legally
enforceable obligation upon the parties.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be signed
as of the date and year first above written.
VILLAGE OF ROTHSCHILD VILLAGE OF WESTON
By: _______________________ By: ____________________________
Dan Helgeson, President Mark Maloney, President
Attest: _______________________ Attest: ____________________________
Elizabeth Felkner, Clerk Pamela Brehm, Clerk
CITY OF SCHOFIELD
By: ____________________________________
Kregg Hoehn, Mayor
Attest: _____________________________________
Lisa Quinn, Clerk/Treasurer
THIS INSTRUMENT WAS DRAFTED BY:
Michael Wodalski, P.E.,
Director of Public Works
Village of Weston
4747 Camp Phillips Rd
Weston, WI 54476
Village of Weston, Wisconsin
Stormwater Quality Management Plan Update Section 5–Alternatives Analysis
Prepared by Strand Associates, Inc. 5-5
R:\MAD\Documents\Reports\Archive\2022\Weston, WI\SQMP.1858.003.JJG.Aug\Report\S5.docx\100322
1. Dry Detention Basin to Wet Detention Basin Conversion
All dry detention basins in the Village were evaluated to see whether a conversion to a
wet pond is warranted. The majority of the dry ponds were shown to get a substantial TP
reduction as they were modeled as grass swales per recent WDNR guidance. There were
very few dry ponds with a TP reduction less than 60 percent and the ones that were, had
a very low pollutant loading. Therefore, it is not recommended to pursue dry detention to
wet detention basin conversion in the Village with the current inventory of dry ponds a s
the cost benefit is not in the Village’s favor.
2. Inclusion of Privately-Owned BMPs
As shown in Table 4.05 -2, all the privately -owned BMPs on record have a long -term
maintenance agreement in place with the Village. As a result, these privately-owned BMPs
were included in the Village’s Existing Conditions modeling analysis. It is recommended
the Village continue to obtain long-term maintenance agreements with all private owners
of BMPs so the Village can take credit for the cumulative pollutant reduction performance.
3. WisDOT Right-of-Way (ROW) Wet Detention Basin
A wet detention basin is proposed to be located in the WisDOT ROW enclosed by the
STH 29 entrance ramp off East Grand Avenue. This land is not currently owned by the
Village; therefore, leasing the land or an easement would need to be approved to construct
the pond, or an intermunicipal agreement with WisDOT, Rothschild, Schofield, and the
Village to construct on WisDOT lands. The cost of leasing or purchasing the land was not
included in the OPCC. The proposed pond is also near wetlands so a wetland delineation
would be recommended before design. There is approximately a 1,031 -acre upstream
drainage area that consists of a large mix of developed land use. Approximately
70.4 percent of the drainage area is coming from Village of Weston land (727 acres) while
27.9 percent is from the Village of Rothschild (287.3 acres) and 1.7 percent is from the
City of Schofield (17.3 acres). Figure J-1 in Appendix K shows the location of the proposed
wet detention basin (4H:1V side slopes were used in the preliminary layout of the pond).
The cost of a clay liner is included in this alternative. It is recommended that geotechnical
investigation be completed during design of wet detention basins to determine the need
for and cost of a clay liner.
The proposed wet pond would have a permanent wet pool of approximately 2. 3 acres.
The WisDOT ROW wet detention basin provides additional treatment to 24 upstream
drainage basins in R each 154 . The wet detention basin is modeled to achieve a
43.6 percent TP reduction for upstream lands draining to it.
This section of Highway 51 is scheduled for reconstruction in 2025, which would be an
opportunity to install a BMP here in collaboration with WisDOT.
Path: S:\MAD\1800--1899\1858\003\Drawings\GIS\Figures\Alternatives\WisDOT ROW Wet Pond 11x17.mxd User: mirandah Date: 2/4/2022 Time: 2:12:00 PM
FIGURE J-1
1858.003
ALTERNATIVE WISDOT ROW WET POND
STORMWATER QUALITY MANAGEMENT PLAN UPDATE
VILLAGE OF WESTON
MARATHON COUNTY, WISCONSIN
#*
#*
#*
#*
&
&
&
&
&
& &
&
&
&
&
&
&
&&
&
!.
!.
!.
WR-4
WR-6
(E-STH)
WR-5
WR-2
WR-5.1
WR-1
(E-RIP)
1180
1182
1184
1186
1188
1190
1192
1194
1198
1196
1212
1179 11781181
1177
1200
1176
1175
1202
1174
1210
1208
1173
1206
1172
1204
1171
1170
1169
1168
1167
1165
1164
1163
1162
1166.5
1165.5
1161.5
1214
1190
1178
1184
1206
1190
1182
1180
1180
1178
1184
1188
1180
1194
1176
1172
1180
1190
1180
1180
1178
1178
1174
1180
1180
1180
1176
1186
1182
1178
1178
1192
1178
1178
1186
1184
1178
1182
1212
1178
1180
1170
1172
1178
1178
1214
1178
1178
1208
1180
1180
1178
1174
1186
1180
1208
1210
1184
1180
1210
1184
1180
1180
1180
1180
1180
1186
1188
1176
1180
1180
1182
1192
1190
1178
1182
1182
1194
1184
1186
1178
1180
1178
1210
1180
1190
1200
1210
1170
1180
1180
1180
1180
1180
1210
1190
1210
1180
1180
1190
1210
1180
1180
1180
1180
1180
1180
1180
1190
1180
1180
1180
1180
Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID,
IGN, and the GIS User Community, Esri, HERE, Garmin, (c) OpenStreetMap contributors
!(
!(
217
LW-9243
LW-18 (E-RIP)
204
LW-2
243
LW-18 (E-RIP)
114
US ECR-8C
201
US LW-1
209
LW-3
115
ECR-8D
200
LW-1
210
LW-4
212
LW-6
213
LW-7
203
LW-1B
226
LW-12
207
LW-2B (INT)
116
US ECR-8D
218
US LW-9
202
LW-1A
205
US LW-2
211
LW-5
219
LW-9A
220
LW-9B
221
LW-9C
WR-4
WR-6
WR-6
EXCLUDE OF WR-4
WR154-201
ECF290-608
ECR155-309
WR154-2011
ECR155-331
WR154-210
ECR155-3095
WR154-2015
CC263-499
WR154-219
ECR155-3097
ECR155-310
WR154-213
WR154-212
WR154-2127
WR154-2014
CC263-425
WR154-2132
CC263-423
ECR155-3104
ECR155-330
ECR155-333
WR154-211
ECR155-3301
CC263-422
ECR155-3321
WR154-2133
WR154-20151
WR154-2124
WR154-209
ECF290-6089
CC263-424
CC263-420
WR154-20112
WR154-206
CC263-493
CC263-492
WR154-202
ECF290-6083
WR154-2013
CC263-419 CC263-494
ECF290-6082
ECR155-3102
CC263-421
WR154-20153
WR154-20152
ECF290-6087
WR154-2126
ECR155-3303
WR154-2121
WR154-2101
CC263-491
ECF290-6086
WR154-218
WR154-2021
WR154-2125
WR154-2091
CC263-84231
ECR155-3209
WR154-208
WR154-2131
ECR155-3094
ECR155-3302 ECR155-3311
ECR155-332
WR154-20154
ECF290-6085
ECF290-6081
CC263-426
ECF290-60714
ECR155-3304
ECF290-6081
ECR155-3106ECR155-3096
WR154-203
WR154-207
WR154-2123
ECR155-33011
ECF290-60713
ECR155-3331
WR154-2012
CC263-416
ECF290-60831
ECR155-3105
CC263-4201
WR154-2122
WR154-82134
ECF290-60712
ECR155-3107
ECF290-6084
CC263-84241
CC263-400
ECF290-60841
ECF290-6088
ECR155-3098
WR154-20161
WR154-2016
ECF290-6081 ECR155-3093 ECR155-3101
CC263-417
CC-4
WR-1
(E-RIP)
CC-8
WR-11
WR-6
(E-STH)
CC-2
CC-10
CC-13
WR-22
CC-12
WS-1
(E-LU & O MS4)
CC-9
(E-RIP)
CC-11
WR-4
WR-7
(E-RIP)
WR-19
WR-10
WS-3
WS-4
WR-12
CC-3
CC-5
WR-21
WR-2
WR-14
(E-STH)
CC-6
WR-9
CC-1
WR-20
WS-2
WR-8
(E-STH)
CC-7
WR-5
CC-14
CC-14
WR-16
(E-STH)
WR-13
Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus
DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
0 50 10025
Feet
/
Legend
!. Proposed Manhole
Proposed Storm Sewer
Storm Sewer Removal
& WaterValve
#* Hydrant
WaterMain
!. SanitaryStructures
SanitaryMain
Weston Basins
Schofield Basins
Rothschild Basins
WI_Wetlands
Floodplain
!. Storm Manholes
Storm Sewer
Index
Intermediate
TOTAL DRAINAGE AREA=1031.0 ACRES
LOCATION MAP
30 LF OF 60" RCP
SLOPE: 4.9%
WET POND
NWL: 1166.5
2.26 ACRES
STRAND SURVEY/WISDOT PLANS
RIM: UNKNOWN/APPROX. 1177.00
60" W & E IE; UNKNOWN/1162.99
STRAND SURVEY/WISDOT PLANS
RIM: 1170.77/APPROX. 1170.00
72" W& 60" E IE: W1163.82 E1164.87/1163.73 STRAND SURVEY/WISDOT PLANS
RIM: UNKNOWN/APPROX. 1180.00
60" IE: UNKNOWN/1170.3
18" NE IE:UNKNOWN/APPROX 1172.00
STRAND SURVEY/WISDOT PLANS
RIM: 1175.68/ APPROX. 1176
18" IE: UNKNOWN/APPROX. 1172.5
STRAND SURVEY/ WISDOT PLANS
RIM: 1179.66/UNKNOWN
54" NE IE: 1167.60/ UNKNOWN
54" SW IE: 1167.59/ UNKNOWN
STRAND SURVEY/ WISDOT PLANS
RIM: 1180.14/1177.95
54" NE IE: 1167.23/1165.29
54" SW IE: 1167.18/1165.29
STRAND SURVEY/WISDOT
RIM:1189.25/1189.00
60" IE: UNKNOWN/1175.55
18" ENDWALL
PROPOSED MANHOLE
RIM: 1174
IE: 1165.04
WET POND LOCATION
162 LF 36" RCP
SLOPE: 0.4%
DIVERSION MANHOLE
60" ENDWALL
OUTLET STRUCTURE
36" ENDWALL
54 LF 18" RCP
SLOPE: 2.0%
57 LF 60" RCP
SLOPE: 2.0%
PROPOSED MANHOLE
RIM: 1178
IE: 1167.58
PROPOSED MANHOLE
RIM: 1182
IE: 1167.64
Village of Weston, Wisconsin
Stormwater Quality Management Plan Update Section 7–Conclusions and Recommendations
Prepared by Strand Associates, Inc. 7-2
R:\MAD\Documents\Reports\Archive\2022\Weston, WI\SQMP.1858.003.JJG.Aug\Report\S7.doc\100322
8. Update the Village’s storm sewer system map on an annual basis.
9. Submit an annual report to WDNR documenting and tracking permit-related activities.
10. Maintain stormwater BMPs according to the Maintenanc e and Inspection of Stormwater
Management Facilities document provided in Appendices G and H of the Village ’s
Erosion Control and Stormwater Management Reference Guide and Policy.
11. Leverage funds from the SWU and grants for design and construction of the necessary
improvements.
12. In the next stormwater quality model ing update, in clude all work completed since the
WDNR approval of existing conditions modeling in 2022. Update the Village’s TP Leaf
Credit Analysis to reflect changes in Village practices and any revisions made to the
WDNR’s Interim Municipal Phosphorus Reduction Credi t for Leaf Management
Programs guidance by that time.
7.03 IMPLEMENTATION PLAN
Tables 6.04 -1 and 7.03 -1 include a breakdown of Alternative 1 for TMDL compliance (and further
described in Sections 5.04 and 5.10 and Tab le 5.04 -1) includi ng the cost of each component, the
implementation schedule, and applicable funding source, if applicable. This includes continuing to
administer the existing stormwater program while incorporating recommendations, herein. Over time,
the Village should consider other opportunities for TP reductions as they arise including consideration
of components of Alternatives 1, 2, or 3 if they make sense for the Village. If the Village needs to
consider additional measures to achieve TMDL compliance in the future, req uiring 80 percent TP
reduction for new development could be considered.
Village of Weston, Wisconsin
Stormwater Quality Management Plan Update Section 7–Conclusions and Recommendations
Prepared by Strand Associates, Inc. 7-3
R:\MAD\Documents\Reports\Archive\2022\Weston, WI\SQMP.1858.003.JJG.Aug\Report\S7.doc\100322
Table 7.03-1 TMDL Implementations Plan–Pounds TP
2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 2047 2048
WQT 19.4 38.9 58.3 77.8 97.2 116.7 136.1 155.5 175.0 194.4 213.9 233.3 252.7 272.2 291.6 311.1 330.5 350.0 369.4 388.8
WisDOT ROW WP 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4
Camp Phillips Road WP 51.7 51.7 51.7 51.7 51.7 51.7 51.7 51.7 51.7 51.7 51.7 51.7 51.7 51.7 51.7 51.7 51.7 51.7 51.7
Zinser Street and Callon Avenue WP 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0
Ross Avenue and Birch Street WP 27.6 27.6 27.6 27.6 27.6 27.6 27.6 27.6 27.6 27.6 27.6
Enhanced Street Sweeping 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9
TP Leaf Credit 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72
Redevelopment at 40% TSS Reduction 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4
Total 0.0 21.0 21.0 21.0 143.4 143.4 143.4 162.9 234.0 253.4 272.9 292.3 334.8 354.2 373.7 393.1 440.2 459.6 479.1 498.5 517.9 537.4 556.8 576.3 595.7 615.2 634.6
Cumulative Village Wide % TP Reduction 48.4% 49.1% 49.1% 49.1% 53.0% 53.0% 53.0% 53.6% 55.9% 56.5% 57.1% 57.7% 59.1% 59.7% 60.3% 60.9% 62.4% 63.1% 63.7% 64.3% 64.9% 65.5% 66.2% 66.8% 67.4% 68.0% 68.6%
% Closure of TP Reduction Gap 0.0% 3.3% 3.3% 3.3% 22.6% 22.6% 22.6% 25.7% 36.9% 40.0% 43.1% 46.1% 52.8% 55.9% 59.0% 62.1% 69.5% 72.6% 75.6% 78.7% 81.8% 84.8% 87.9% 91.0% 94.0% 97.1% 100.2%
Village of Weston, Wisconsin
Stormwater Quality Management Plan Update Section 7–Conclusions and Recommendations
Prepared by Strand Associates, Inc. 7-4
R:\MAD\Documents\Reports\Archive\2022\Weston, WI\SQMP.1858.003.JJG.Aug\Report\S7.doc\100322
7.04 PROGRAM FUNDING OPTIONS
Possible funding sources fo r implementation of ac tivities required for compli ance with the sto rmwater
permit are described herein.
A. Grants
Some of the more popular WDNR grant programs include the UNPS and Stormwater ,
Healthy Lakes and River s, Surf ace Water Restoration, Managemen t Plan I mplementation, Surface
Water Planning, Comprehensive Manage ment Planning for Lakes and Watersheds , and Municipal
Flood Control grant programs . The WDNR UNPS Grant is the most appropriate for impl ementing
stormwater quality BMP s recommended in this plan. 50 percent of the design and construct ion of a
stormwater qu ality BMP could be covered by the grant program should the Village be successful in
obtaining a grant. Land acquisition is also fun ded through th is gran t program . The remaining
percent age would b e covered b y Village funds. Scoring cri teria dictates that if the Village were to
pay a higher perce ntage, then the score of t he grant application would increase, potentially
increasing the od ds of grant aw ard.
The C lean W ater Fund (CWF) administered thro ugh the WDN R is also a fu nding o ption w ith
current funding pr oviding a 30 percent principal forgiven ess loan and a 70 percent low interest
loan. The principal forgiveness loan is received thro ugh a competit ive pro cess. An I ntent to
Apply (ITA) a nd Priority Evaluation Review Form ( PERF) f orm wou ld nee d to be submitte d to the
WDNR.
B. Fees
Fees are anoth er common means of funding stormwater management improvements. Fees are
charges for services rendered. Many municipalities (including the Village) recover costs of constructing,
designing, reviewing, and inspecting new developments through fees assessed to developers. Impact
fees and special assessments transfer the cost of infrastructure impr ovements neede d for p rivate
development directly to d evelopers o r property owners. User f ees recove r co sts ov er the life of a
project. An increasingly common type of u ser fee related to stor mwater management is a n SWU.
Formation of stormwater utilities enab les municipalities t o r ecover costs of stormwater ma nagement
improvements based on the amount of stormwater “generated” by a land use. The Village has a SWU.
The Village may want to use modified SWU rates to assist in funding the implementation of this plan.
C. Bonds
Large capital improvement projects such as major storm sewers or det ention facilities may be funded
through bonds or grants. Bon ds are a mecha nism to b orrow capital for a project and distribute
repayment over the life span of the project. A po pular local bonding p rogram is the Clean Water Fund
Program ( CWFP). This is one of the subsidi zed loan progr ams in cluded in WDNR’s Environmental
Improvement Fund ( EIF). The CW F provi des loans to municipalities for wast ewater treatment and
urban stormwater projects. This progra m has historically been use d extensively for WWTP
construction. Recent prog ram modifications allow f unds to be used for storm water ma nagement
improvements.
Village of Weston, Wisconsin
Stormwater Quality Management Plan Update Section 7–Conclusions and Recommendations
Prepared by Strand Associates, Inc. 7-5
R:\MAD\Documents\Reports\Archive\2022\Weston, WI\SQMP.1858.003.JJG.Aug\Report\S7.doc\100322
Most CWF projects receive a subsidized i nterest rate of 55 percent, 65 percent, or 70 percent of th e
EIF market interest rate. CWF wastewater projects that meet certain criteria may be eligibl e to receive
Hardship Financial Assistance, which may be in the form of a lower interest rate loan or include a grant.
7.05 POLICIES AND PRACTICES
A. General
As in a ny typ ical community, localized drainage issues commonl y arise that m ay affect a limite d
number of areas. These issues may be c aused by a deficiency in a d rainage facility, a maintenance
issue, or alterations of property during maintenance or construction projects.
It is recom mended the Village develop a uniform policy for addressing localized drainage issues and
maintain a rec ord of wher e these issues have occurred. This policy should e stablish the procedure to
be followed in resolving future draina ge issues in the Village. This will ensure that future i ssues are
addressed in an equitable and timely manner and locations of recurring problem areas can be identified
for future planning purposes.
B. Recommended Policy
This section includes a recommended policy for addressing drainage issues which should be reviewed
by the Village and, if appropriate, adopted as a formal policy.
1. Problem Identification and Drainage Evaluation
a. After receiving a verbal or written complaint from a resident, the resi dent should
be provided a Drai nage Evaluat ion Form (Appendix N). The reside nt should
complete Parts A, B, and C of the form and return it to the Village.
b. Within 30 calendar days of receivi ng the form with completed Parts A, B, and C,
a Village representative will inspect the location and revie w the informat ion
submitted by the resident. The Village representative will complete Part D of the
form based upon this review.
c. The Village representative will make a recommendation in Part E of the form
regarding ac tion to be taken (if any) to allevi ate or mitigat e the problem.
Decision-making criteria will be clearly stated.
d. A copy of the comp leted D rainage Evaluation Form will be returned to the
resident. Additional copies will be maintained by the Village and the form and
complaint loca tion will be i ncorporated into the Village’s
Geographical Information System database for future an alysis of drainage
problem area trends.
Village of Weston, Wisconsin
Stormwater Quality Management Plan Update Section 7–Conclusions and Recommendations
Prepared by Strand Associates, Inc. 7-6
R:\MAD\Documents\Reports\Archive\2022\Weston, WI\SQMP.1858.003.JJG.Aug\Report\S7.doc\100322
2. Village Authority
The Village authority in addressing individual drainage iss ues should be determin ed on a
case-by-case basis. Before the Village takes corrective action, the ownersh ip of the p roperties
causing the problem and be ing damaged should be verified. Where the Village has easement
rights and the issue involves the obstruc tion of a natural wate rcourse (under Section 88.90 of
the WAC), the Village can move to correct the probl em. If the drainage issue re sults from an
activity that is not located on a Village property or ROW, does not violate a Village ordinance, or
does not involve obstruction of a natural watercourse, the Village may be without ju risdiction to
act.
3. Determination of Village Responsibility
In cases where it is d etermined, the Village can take corrective a ction to address the drainage
deficiency, the following steps should be taken:
a. Alternative solutions to the identified pro blem should be developed a nd
incorporated into the Village stormwater management plan.
b. Opinions of probable engineering and construction costs of individual projects
should be prepared.
c. As part of the annua l bu dget process, projects to be construct ed each year
should be selected based upon priority ranking and funding availability.
7.06 CONCLUSION
The purpose of this plan has been to provide the Village with a WPDES permit-compliant SQMP.
The Village should use this report to guide its stormwa ter permit compliance eff orts.
Funding of the stormwater pr ogram is a t the discretion of t he Village. At this time, it appears that
the most economical way to i mplemen t a stormwater program is to leverage SWU funds in
addition to applying for WDNR UNPS and SW grants and other ap plicable grants for th e
recommended alternativ e stormwater BMP component s r equired to close the TP reduction gap
and maintain pe rmit co mpliance.
REQUEST FOR CONSIDERATION
REQUEST FOR CONSIDERATION
PAGES 1 OF 2
Public Mtg/Date:
Public Works Committee – 11/9/2026
Description:
Intergovernmental Agreement with the Town of
Weston for the reconstruction of Ross Ave from River
Bend Rd/Powers St to Pauls Ave
From:
Michael Wodalski, PE - Director of Public Works
Question:
Should the Public Works Committee Recommend
approving an Intergovernmental Agreement with the
Town of Weston for the reconstruction of Ross Ave
from River Bend Rd/Powers St to Pauls Ave?
Background
Since 2019, the Village and Town have been working together on the reconstruction of
Ross Ave from River Bend Rd to Pauls Ave. In 2023 the two communities submitted a
Wisconsin Department of Transportation (WisDOT) Surface Transportation Program –
Urban (STP-U) grant and successfully obtained a grant to reconstruct Ross Ave from
River Bend Rd to Pauls Ave for a grant amount of $2,211,598. The grant is intended to
fund 75% of the project costs with the remaining costs then split between the Village
and Town of Weston.
The attached Intergovernmental Agreement lays out the proportionate share of costs for
the project to each community and also goes through how water and sewer costs will be
the responsibility of the Village. We also discuss the possibility of future annexations
and how those costs would be handled if land currently in the Town is annexed into the
Village before the Town’s debt payments are fully paid.
Based on the WisDOT agreement for the project, this project is currently programmed
for reconstruction in 2028.
Staff recommends moving forward with the Intergovernmental Agreement
Attached Docs: Draft Agreement and Project Estimate
______________________________________________________________________
Committee Action: Project was previously endorsed and engineering contract
with Becher Hoppe has been approved.
Fiscal Impact: Villages estimated cost are shown on the attached
estimate. Overall Village cost is around $2.96 Million of
which $2.2 Million is estimated as utility costs and the
remainder general fund costs
_______________ ___________________________________________________________
Recommendation: Staff recommendation is to approve the Intergovernmental
Agreement with the Town of Weston for the reconstruction
of Ross Ave from River Bend Rd to Pauls Ave.
REQUEST FOR CONSIDERATION
REQUEST FOR CONSIDERATION
PAGES 2 OF 2
Recommended Language for Official Action
I Move to Recommend the Village Board approve the Intergovernmental
Agreement with the Town of Weston for the reconstruction of Ross Ave from
River Bend Rd to Pauls Ave.
Or, Something else
_____________________________________________________________________
Additional action:
Page 1 of 4
INTERGOVERNMENTAL AGREEMENT
THIS AGREEMENT dated this _______day of ______ 202_, is by and between the
VILLAGE OF WESTON, a Wisconsin municipal corporation of Marathon County,
Wisconsin (herein " VILLAGE") and the TOWN OF WESTON, a Wisconsin municipal
corporation of Marathon County, Wisconsin (herein " TOWN"), (collectively referred to
herein as “the Municipalities” or singularly “the Municipality”).
WHEREAS, Ross Avenue from River Bend Road east approximately 0.1 miles is a sixty-
six (66) foot wide right -of-way (ROW), the entire ROW is located in the VILLAGE, from
0.1 miles east of River Bend Rd, for 0.12 miles to Kramer Ln there is a sixty-six (66) foot
wide ROW, the northern 33 feet of which is located in the TOWN and the southern 33
feet of which is located in the VILLAGE , for 0.13 miles to Kramer Ln there is a sixty -six
(66) foot wide ROW of which all ROW is located in the VILLAGE, and then for 0.25 miles
to Kramer Ln there is a sixty-six (66) foot ROW of which the northern 33 feet is located in
TOWN and the southern 33 f eet is located in VILLAGE . North from the Kramer Ln and
Ross Avenue intersection for 0.25 miles, a sixty-six (66) foot wide ROW exists entirely in
the TOWN. For 0.25 miles north of Quentin St to Paul’s Ave, a sixty -six (66) foot wide
ROW exists with the western 33 feet located in the VILLAGE and the eastern 33 feet in
the TOWN; and
WHEREAS, that part of Ross Avenue described above is in need of reconstruction,
including the installation of storm sewer and/or culverts, street reconstruction including
installation of driveway approaches, and off pavement bicycle and pedestrian
accommodations with landscaping and restoration; and
WHEREAS, pursuant to Section 66.0301 of the Wisconsin Statutes, the Municipalities
hereto have agreed to an intergovernmental contract for the purpose of jointly
participating in the Ross Avenue reconstruction project by providing for a plan for project
administration and oversight, the furnishing of labor and equipment, the sharing of costs
and expenses associated with the project and providing for a mechanism for billing and
payment of project costs; and
WHEREAS, the Municipalities partnered in applying for the Wisconsin Department of
Transportation (WisDOT) Surface Transportation Program – Urban (STP-U) grant for the
2024-2029 award cycle; and
WHEREAS, a State Municipal Agreement with the WisDOT was signed between the
VILLAGE and State in August 2024. The agreement allocates $2,211,598 in federal
funding for the joint Ross Ave Project. This project has Project ID of 6999- 13-04 and is
scheduled for construction in State Fiscal Year 2028.
Page 2 of 4
NOW, THEREFORE, upon the foregoing premise and in consideration of the mutual
covenants hereinafter set forth, and other good and valuable consideration, the receipt
and sufficiency of which is hereby acknowledged, the parties hereby mutually agree as
follows:
1. The reconstruction of Ross Avenue from River Bend Rd on the west end to Paul’s
Ave on the north is planned to take place in the year 202 8. The scope of the
project is currently assumed to be the following:
a. A 30-foot wide asphalt pavement with 11-foot drive lanes and a 4-foot paved
shoulder,
b. Four inches of asphalt pavement,
c. Roundabout at the intersection of Ross Ave and Kramer Ln,
d. A 10 -foot multi -use path adjacent to Ross Ave with 2 inches of asphalt
pavement,
e. Storm sewer, culverts or ditching to drain the street and the surrounding
area draining to or through the street.
f. The VILLAGE will be extending sanitary sewer and water mains as part of
the project to benefit property within the VILLAGE. The TOWN and
VILLAGE agree to work cooperatively as to the method of cost recovery for
sanitary sewer and water mains which benefit property within the TOWN.
Cost recovery by the VILLAGE for property within the TOWN may require
an annexation agreement(s), special assessment agreements ,
development agreements, or other legally binding documents which allow
the VILLAGE to recover its assessable costs.
2. An estimate of the project construction costs, titled "Estimated Costs for Street
Reconstruction “Preliminary,” reflecting the proposed apportionment of the costs
to the VILLAGE and TOWN is attached hereto and made a part hereof as if fully
set forth herein at length and marked Exhibit "A ". The preliminary construction
cost estimate less the water and sewer utility infrastructure is $2,183,364.86 with
the estimated responsibility being $1,075,858.22 for TOWN and $1,107,506.65 for
VILLAGE.
For purposes of establishing the method of assigning costs to each community,
the construction cost apportionment is estimated as follows:
a. Street construction costs for the Ross Avenue main line will be split 50.7%
to VILLAGE and 49.3% to TOW N. If property abutting the street right -of-
way should be added or detached from either governmental unit’s
jurisdiction after the date of this agreement and prior to project completion,
the cost split for local matching funding shall be adjusted to reflect
apportionment of total costs on the basis of street frontage within each
governmental unit.
Page 3 of 4
i. If there are annexations from TOWN to VILLAGE after construction,
and the TOWN is still paying off debt proceeds, the VILLAGE will
reimburse the TOWN for the proportionate share of any debt
payment related to the portion of roadway no longer within the
TOWN’s jurisdiction.
b. Driveway transition and paving costs will be apportioned to the community
in which the benefitting property is located.
c. Storm sewer/drainage costs will be apportioned at the same ratio of Street
costs.
d. Sanitary Sewer and Water Utility costs will be 100% the responsibility of the
VILLAGE.
3. The breakdown of detailed costs will also be used to determine the apportionment
of administration, overhead, engineering and other project delivery costs o n the
project. The preliminary estimate of Engineering Design is $345,750.00 with the
apportionment of responsibility being determined as described in Item 2, above.
Construction Engineering costs based on the requirements in the STP -U
application were estimated by WisDOT to be $514,935 and will be apportioned as
described in Item 2, above.
4. The municipalities will be receiving grant funds through the Wisconsin Department
of Transportation’s STP- U Program. Those funds total $2,211,598 and will be
used first to pay for the Participating Costs (Street and Drainage). The remainder
of the costs known as the Local Share will then be each Municipalities expense on
the basis of the proportionate costs of construction, excluding sanitary sewer and
water improvements.
a. Based on Project Costs, Grant funds will be split proportionally with the
TOWN receiving $1,090,317.81 and the VILLAGE receiving $1,121,280.19.
b. The Net Project Costs are estimated to be $325,713.35 for the TOWN and
$2,963,849.22 for the VILLAGE
5. VILLAGE will fill the role of project manager to include the following duties:
a. Selection and hiring of an engineer to perform design and bidding services
for the project.
b. Advertising for bids, in accordance with Section 66.0901 of the Wisconsin
Statutes, and execution of a contract for the subject public works
improvements.
c. Administration of the public works contract to include approvals of payments
Page 4 of 4
and accounting of all costs associated with the project
d. Selection and hiring of an engineer to perform construction inspection,
oversight of the contract, and preparation of record drawings for the subject
public works improvements.
6. Each party to this agreement shall be responsible for conducting its own special
assessment process for the project, if applicable.
7. The recitals contained in the preamble to this agreement shall be and hereby are
incorporated as part of the agreement between the parties. Construction on the
project is based on WisDOT grant funding and is expected to be a 202 8 year
construction. Each of the parties shall cooperate fully with one another and extend
their respective best efforts in completing the project in an expeditious and timely
manner.
8. This agreement represents the entire agreement between the parties and shall not
be amended, changed, or modified except by written agreement signed by each
of the parties hereto.
9. Each party warrants and represents to each other that the execution of this
Agreement by their respective officers or agents has been duly authorized and that
this Agreement, when fully executed, constitutes a valid, binding and legally
enforceable obligation upon the parties.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be signed
as of the date and year first above written.
VILLAGE OF WESTON TOWN OF WESTON
By: _______________________ By: ____________________________
Mark Maloney, its President Dave Phelps, its Chairman
Attest: _______________________ Attest: ____________________________
Pamela Brehm, its Clerk Robin Huempfner, its Clerk/Treasurer
THIS INSTRUMENT WAS DRAFTED BY:
Michael Wodalski, P.E.,
Director of Public Works and Utilities
Village of Weston
4747 Camp Phillips Rd
Weston, WI 54476
11/4/2026
Item Estimated Unit
Number Item Description Units Quantity Price
100 Sanitary Sewer
104 PVC Sanitary Sewer, 8 inch L.F. 3300.00 $75.00 $247,500.00 - $0.00 3,300.00 $247,500.00
105 PVC Sanitary Sewer, 10 inch L.F. 4625.00 $90.00 $416,250.00 - $0.00 4,625.00 $416,250.00
106 Sanitary Manhole, 48 inch EA. 20.00 $7,500.00 $150,000.00 - $0.00 20.00 $150,000.00
107 Manhole Frame and Cover
(R1550A(1040)-5080) EA. 20.00 $825.00 $16,500.00 - $0.00 20.00 $16,500.00
108 PVC Wye, 8 inch x 4 inch EA. 16.00 $175.00 $2,800.00 - $0.00 16.00 $2,800.00
109 PVC Wye, 8 inch x 6 inch EA. $175.00 $0.00 - $0.00 0.00 $0.00
110 PVC Wye, 10 inch x 6 inch EA. 2.00 $175.00 $350.00 - $0.00 2.00 $350.00
111 Sanitary Sewer Lateral, 6 inch EA. $90.00 $0.00 - $0.00 0.00 $0.00
112 Sanitary Sewer Lateral, 4 inch L.F. 720.00 $85.00 $61,200.00 - $0.00 720.00 $61,200.00
113 Lateral Connection & Adjustment EA. 18.00 $250.00 $4,500.00 - $0.00 18.00 $4,500.00
114 Mobilization - Sanitary LS 1.00 $25,000.00 $25,000.00 - $0.00 1.00 $25,000.00
115 Television Inspection LF 7925.00 $2.00 $15,850.00 - $0.00 7,925.00 $15,850.00
Sanitary Sewer Subtotal $939,950.00 $0.00 $939,950.00
200 Water
202 Hydrant, Waterous 8' Bury - Yellow EA. 11.00 $8,500.00 $93,500.00 - $0.00 11.00 $93,500.00
207 Mobilization - Water LS 1.00 $25,000.00 $25,000.00 - $0.00 1.00 $25,000.00
208 Connect to Existing (8-inch) EA. 1.00 $2,000.00 $2,000.00 - $0.00 1.00 $2,000.00
209 Connect to Existing (12-inch) EA. 1.00 $3,500.00 $3,500.00 - $0.00 1.00 $3,500.00
210 Ductile Iron Watermain, 6 inch -
Thickness Class 50 L.F. 440.00 $70.00 $30,800.00 - $0.00 440.00 $30,800.00
211 Ductile Iron Watermain, 8 inch -
Thickness Class 50 L.F. $90.00 $0.00 - $0.00 0.00 $0.00
212 Ductile Iron Watermain, 12 inch L.F. 5950.00 $100.00 $595,000.00 - $0.00 5,950.00 $595,000.00
213 Gate Valve, 6 inch EA. 11.00 $2,500.00 $27,500.00 $0.00 11.00 $27,500.00
214 Gate Valve, 8 inch EA. $3,000.00 $0.00 - $0.00 0.00 $0.00
215 Gate Valve, 12 inch EA. 13.00 $4,500.00 $58,500.00 - $0.00 13.00 $58,500.00
216 Ductile Iron Tee, 10 X 10 x 8 EA. $645.00 $0.00 - $0.00 0.00 $0.00
217 Ductile Iron Tee, 12 X 12 x 6 EA. 11.00 $1,000.00 $11,000.00 - $0.00 11.00 $11,000.00
218 Ductile Iron Tee, 12 X 12 x 12 EA. 3.00 $1,250.00 $3,750.00 - $0.00 3.00 $3,750.00
221 12" Ductile Iron Fittings EA. 24.00 $2,120.00 $50,880.00 - $0.00 24.00 $50,880.00
222 Rigid Insulation Board, 4-Inch S.F. $2.50 $0.00 - $0.00 0.00 $0.00
223 Plug (12") EA. 2.00 $1,000.00 $2,000.00 - $0.00 2.00 $2,000.00
224 Plug (8") EA. $115.00 $0.00 - $0.00 0.00 $0.00
225 Water service Group, 1 inch EA. 18.00 $2,500.00 $45,000.00 - $0.00 18.00 $45,000.00
226 Copper Water Service, 1 inch L.F. 720.00 $75.00 $54,000.00 - $0.00 720.00 $54,000.00
Water Subtotal $1,002,430.00 $0.00 $1,002,430.00
300 Storm Sewer
301 Culvert Pipe LF 300.00 $200.00 $60,000.00 147.83 $29,565.14 152.17 $30,434.86
Storm Sewer Total $60,000.00 $29,565.14 $30,434.86
Total Project Cost Quantity Cost Quantity Cost
EXHIBIT A
Estimated Costs for Street Reconstruction "PRELIMINARY"
Ross Ave (River Bend to Pauls)
30 foot pavement, 4" thick
Total Project Cost TOWN Costs VILLAGE Costs
261104 Ross ave estimate revised
11/4/2026
Item Estimated Unit
Number Item Description Units Quantity Price Total Project Cost Quantity Cost Quantity Cost
EXHIBIT A
Estimated Costs for Street Reconstruction "PRELIMINARY"
Ross Ave (River Bend to Pauls)
30 foot pavement, 4" thick
Total Project Cost TOWN Costs VILLAGE Costs
400 Street Reconstruction
401 Remove Existing Pavement SY 15,386.67 $5.00 $76,933.33 7,581.82 $37,909.08 7,804.85 $39,024.25
402 Mobilization - Streets LS 1.00 $25,000.00 $25,000.00 0.49 $12,318.81 0.51 $12,681.19
403 Crushed Aggregate Base Course CY 6,444.44 $25.00 $161,111.11 3,175.52 $79,387.88 3,268.93 $81,723.23
404 Asphalt Pavement Binder TN 2,900.00 $85.00 $246,500.00 1,428.98 $121,463.46 1,471.02 $125,036.54
405 Asphalt Pavement Surface TN 1,740.00 $85.00 $147,900.00 857.39 $72,878.08 882.61 $75,021.92
406 Shoulders SY - $13.00 $0.00 - $0.00 0.00 $0.00
407 Pavement Marking LF 23,080.00 $2.00 $46,160.00 11,372.72 $22,745.45 11,707.28 $23,414.55
408 Traffic Control LS 1.00 $15,000.00 $15,000.00 0.49 $7,391.29 0.51 $7,608.71
409 Permanent Signs EA. 10.00 $200.00 $2,000.00 4.93 $985.50 5.07 $1,014.50
410 ROUNDABOUT LS 1.00 $600,000.00 $600,000.00 0.49 $295,651.42 0.51 $304,348.58
Street Reconstruction Subtotal $1,320,604.44 $650,730.97 $669,873.47
500 Curb and Gutter
502 24" Concrete Shoulder L.F. 11,540.00 $18.00 $207,720.00 5,686.36 $102,354.52 5,853.64 $105,365.48
505 Crushed Aggregate Base Course CY 854.81 $25.00 $21,370.37 421.21 $10,530.30 433.60 $10,840.07
Curb and Gutter Subtotal $229,090.37 $112,884.82 $116,205.55
600 Sidewalk and Driveways
601 Asphalt Multi-Use Path, 10-foot SY 6,411.11 $13.00 $83,344.44 3,159.09 $41,068.17 3,252.02 $42,276.27
602 Crushed Agg Base Course, 8 Inch CY 1,709.63 $30.00 $51,288.89 842.42 $25,272.72 867.21 $26,016.17
Sidewalk and Driveways Subtotal $134,633.33 $66,340.89 $68,292.44
700 Landscaping and Mobilization
701 Topsoil, Seed, Fertilizer & Mulch SY 19,233.33 $7.50 $144,250.00 9,477.27 $71,079.53 9,756.06 $73,170.47
703 Silt Fence LS 1.00 $10,000.00 $10,000.00 0.49 $4,927.52 0.51 $5,072.48
Landscaping and Mobilization Subtotal $154,250.00 $76,007.05 $78,242.95
Street and Drainage Subtotal 1,898,578.14 $ 935,528.89$ 963,049.26$
Street/Drainage Contingency (15%) 284,786.72 $ 140,329.33 $ 144,457.39 $
Total Participating (Street/Drainage) Cost 2,183,364.86 $ 1,075,858.22 $ 1,107,506.65 $
Water and Sewer Utility Subtotal 1,942,380.00 $ - $ $1,942,380.00
Water/Sewer Contingency (15%) 291,357.00 $ - $ 291,357.00 $
Total Non Participating (Water/Sewer) Cost 2,233,737.00 $ - $ $2,233,737.00
Design Engineering Costs 345,750.00 $ 86,437.50 $ 259,312.50 $
Construction Engineering Costs (from STP Application) 514,935.00 $ 253,735.44 $ 484,573.26 $
Total Project Costs 4,932,036.86 $ 1,416,031.16 $ 4,085,129.41 $
Grant Funds (Split 50.7% Village/49.3% Town) Per ROW Frontage 2,211,598.00$ 1,090,317.81 $ 1,121,280.19 $
Net Project Costs with Grant Funds 2,720,438.86 $ $325,713.35 2,963,849.22 $
TOWN Costs VILLAGE Costs
261104 Ross ave estimate revised
March 13, 2024
Jordan Kelbley
Planning Supervisor
WisDOT NC Region
1681 Second Ave. South
Wisconsin Rapids, WI 54495 -4768
WAUSAU MPO NEW ALLOCATION OF SURFACE TRANSPORTATION BLOCK GRANT (STP-URBAN) FUNDS
FOR 2025-2029
At their March 12, 2024 meeting, the Marathon County Metropolitan Planning Commission (Wausau
MPO) reviewed the funding for the ranked projects submitted for the Surface Transportation Block Grant
(STBG) funds assigned to the Wausau Group. The Commission allocated funds based on new estimates of
the available funds presented by WisDOT. This new amount reflected a larger amount of $4,563,598 for
years 2025-2029.
The Planning Commission reviewed its top project applications within the MPO area with the number one
ranked project now to be awarded funds based on a 75% federal share and a 25% local share, with the
second ranked project receiving the remaining Federal funds for a 70%/30% federal /local split . The
projects are ranked as:
#1 – Ross Avenue from River Bend Road to Paul’s Avenue in the Village of Weston and Town of Weston.
This project was identified to receive $2,211,598 of the allocation.
#2 – Camp Phillips Road (County Road X) and Ross Avenue intersection. This project wa s identified to
receive $2,352,000 of the allocation.
The communities understand that the STBG funds available for this period will be capped at the amounts
set and will be defined and identified in the project agreement with the WisDOT.
If you need any additional information or have comments, please let me know.
David Mack
Wausau MPO Director
Cc Dave Meurett - WisDOT
Evan Maves - WisDOT
James Griesbach – Marathon County
Michael Wodalski – Village of Weston
Milt Olson – Town of Weston