RecordWell Data

Public Works & Utility Committee Meeting Packet 11/09/2026, at 4:30 p.m.

Village of Weston · Marathon County · meeting of Nov 9, 2026 · Agenda packets

Open the original document More from Village of Weston

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

VILLAGE OF WESTON, MARATHON COUNTY, WISCONSIN OFFICIAL MEETING AGENDA OF THE PUBLIC WORKS & UTILITY COMMITTEE Public Works & Utility Meeting – Agenda 11/9/26 Prepared by: Michael Wodalski, Public Works Director The following items were listed on the agenda in the Village Clerk’s Office, in accordance with Chapter 2 of the Village’s Municipal Code and will be ready for your consideration at the next regular meeting of the Public Works Committee which has been scheduled for MONDAY, November 9, 2026, @ 4:30 P.M., in the Board Room, at the Weston Municipal Center 4747 Camp Phillips Rd. Wisconsin State Statutes require all agendas for Committee, Commission, or Board meetings be posted in final form, 24 hours prior to the meeting. Any posted agenda is subject to change up until 24 hours prior to the date and time of the meeting. Join Zoom Meeting by Computer Join Meeting by Phone: https://zoom.us/j/5445915099 +1 312 626 6799 Meeting ID: 544 591 5099 AGENDA ITEMS 1. Meeting called to order by Public Works & Utility Committee Chair Zeyghami 2. Pledge of Allegiance to the Flag 3. Welcome, introductions and acknowledgement of guests. 4. Roll Call by Recording Secretary - Public Works Committee: Hooshang Zeyghami {C}, Luis Lopes-Serrao {VC}, Tom Hubbard, Roy Mumper, Joe Jordan 5. PUBLIC COMMENTS MINUTES AND ACKNOWLEDGEMENTS 6. Approval of 10/12/26 Public Works & Utility Committee Minutes 7. Acknowledge October 2026 Water and Sewer Permits PRESENTATIONS 8. In-Pipe I & I Study Presentation STAFF REPORTS 9. CIP Update 10. Street Operations Update A quorum of members from other Village governmental bodies (boards, commissions, and committees) might attend the above-noticed meeting to gather information. Should a quorum of other government bodies be present at this meeting it would constitute a meeting pursuant to State ex rel. Badke v. Greendale Village Bd., 173 Wis.2d 553,494 N.W.2d 408 (1993). No official actions other than those of the Public Works Committee shall take place. VILLAGE OF WESTON, MARATHON COUNTY, WISCONSIN OFFICIAL MEETING AGENDA OF THE PUBLIC WORKS & UTILITY COMMITTEE Public Works & Utility Meeting – Agenda 11/9/26 Prepared by: Michael Wodalski, Public Works Director 11. Utility Operations Update POLICY DISCUSSIONS AND RECOMMENDATIONS 12. 2027 Sanitary Sewer Rate Options 13. Sidewalk Snow Removal Policy 14. CR-X and Sternberg Ave Pedestrian Design Contract 15. Draft BUS 51 Storm Pond Construction Intergovernmental Agreement 16. Draft Ross Ave – River Bend to Pauls – Intergovernmental Agreement FUTURE ITEMS 17. Next meeting date(s): a) Monday, December 14, 2026 @ 4:30 p.m. Regular Meeting b) Monday, January 11, 2026 @ 4:30 p.m. Regular Meeting 18. Topics for future meetings a) Watermain Replacement 19. Remarks from Staff 20. Remarks from Committee members. 21. Announcements. ADJOURNMENT Valerie Parker updated @ 10/14/2026 1:39 PM Page 1 Mtg_BOT_261019_Consent_Minutes_PW261012W261012 Village of Weston, Wisconsin OFFICIAL PROCEEDINGS OF THE VILLAGE PUBLIC WORKS & UTILITY COMMITTEE MEETING held on Monday, October 12, 2026, at 4:30 p.m., in the Board Room, at 4747 Camp Phillips Road AGENDA ITEMS 1. Meeting called to order by Public Works & Utility Committee Chair and Village Trustee Hooshang Zeyghami at 4:30 p.m. 2. Pledge of Allegiance to the Flag 3. Welcome, introductions and acknowledgement of guests 4. Roll Call of Village Public Works & Utility Committee (PW) by Secretary Parker. Roll call indicated 4 PW members present. Member Present Zeyghami, Hooshang {Chair} YES Lopes-Serrao, Luis {Vice Chair} YES Hubbard, Tom EXCUSED Jordan, Joe YES Mumper, Roy YES Village Staff in attendance, in-person: Gebert, Wodalski, Maguire, Swenson, Blarek, Dolan, and Parker Village Staff in attendance, via Zoom: Clayton Huerth Other Village Representatives in attendance, in-person: None. Other Village Representatives in attendance, via Zoom: Village Trustees, Lisa Beck, and Katrina Clark. Audience Members in attendance, in-person: There were no audience members present, in-person. Audience Members in attendance, via Zoom: There were 2 audience members present, via Zoom. 5. Public Comments [0:1:27 Zoom Meeting Recording] Wodalski explained an email request he received, which he emailed out, from a resident whose side yard is on Fuller Street. He stated this can be a future agenda item where we revisit the sidewalk and snowplowing policy is. He stated with a residential sidewalk, we don’t typically plow those except in a few rare occasions, where there is no boulevard and we plow snow directly onto the sidewalk. Zeyghami stated this could be added to an agenda for discussion. MINUTES AND ACKNOWLEDGEMENTS 6. Approval of 09/14/2026 Public Works & Utility Committee Minutes. [0:02:44 Zoom Recording] Motion by Mumper, second by Jordan: to approve the 09/14/2026 PW meeting minutes. Yes Vote: 4 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS Zeyghami, Hooshang {Chair} YES Lopes-Serrao, Luis {Vice Chair} YES Hubbard, Tom ----- Member (PC) Voting Valerie Parker updated @ 10/14/2026 1:39 PM Page 2 Mtg_BOT_261019_Consent_Minutes_PW261012W261012 Jordan, Joe YES Mumper, Roy YES 7. Acknowledge September 2026 Water and Sewer Permits [0:03:00 Zoom Meeting Recording] Motion by Jordan, second by Mumper, to acknowledge September 2026 Water and Sewer Permits. Yes Vote: 4 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS Zeyghami, Hooshang {Chair} YES Lopes-Serrao, Luis {Vice Chair} YES Hubbard, Tom ----- Jordan, Joe YES Mumper, Roy YES STAFF REPORTS 8. CIP Update [0:03:16 Zoom Meeting Recording] Wodalski pointed out that Parker is taking meeting minutes tonight, as Stacy Gilmeister had resigned from the Village of Weston and has taken a position with a new employer. He stated we are actively recruiting for a new Utility Clerk. He stated later this week there are a few scheduled interviews and they are hoping to have the position filled by the next meeting. Wodalski then went through his report. 9. Street Operations Update [0:16:35 Zoom Meeting Recording] Blarek went through his report. Mumper commented that when staff is spraying paint, even though latex, the staff may need some kind of respiratory protection. 10. Utility Operations Update [0:26:38 Zoom Meeting Recording] Swenson went through his report. POLICY DISCUSSIONS AND RECOMMENDATIONS 11. Business 51 Reconstruction – Neupert Ave Pedestrian Crossing [0:33:24 Zoom Meeting Recording] Dolan explained the report in the packet. There was discussion on safety concerns with pedestrians crossing over Business 51. Wodalski explained that that State considers this a perpetuation project, where it keeps the same geometry. If we want to change anything then there is the cost difference for the municipality. It was brought up that the pedestrian beacons are necessary to aid in the crosswalks. Wodalski brought up the new bike and pedestrian evaluation process that is under development, and the State is going to reach out to their central office at DOT to see if this would be a project that would fit under that. Member (PC) Voting Valerie Parker updated @ 10/14/2026 1:39 PM Page 3 Mtg_BOT_261019_Consent_Minutes_PW261012W261012 Mumper would like to see this be presented to the Community Life and Public Safety (CLPS) Committee Motion by Mumper, second by Jordan, to move to proceed forward with addressing this and a good idea to add this, and also to bring this before the CLPS Committee. Yes Vote: 4 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS Zeyghami, Hooshang {Chair} YES Lopes-Serrao, Luis {Vice Chair} YES Hubbard, Tom ----- Jordan, Joe YES Mumper, Roy YES 12. Proclamation recognizing Crash Responders Safety Week from November 2 – 6, 2026. [0:42:58 Zoom Meeting Recording] Gebert summarized the report explaining that WisDOT’s Traffic Incident Management Enhancement (TIME) program is asking all municipalities to recognize the Federal Highway Administration’s Crash Responder Safety Week (Nov. 2 – 6). Wodalski pointed out that their website offers a slideshow. Motion by Mumper, second by __, to recommend approval of Proclamation 2026-002 recognizing crash responder safety week, November 2 – 6. Yes Vote: 4 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS Zeyghami, Hooshang {Chair} YES Lopes-Serrao, Luis {Vice Chair} YES Hubbard, Tom ----- Jordan, Joe YES Mumper, Roy YES 13. 2027 Sanitary Sewer Rate Options [0:44:45 Zoom Recording] Wodalski explained his report, pointing out that if we keep our vac truck sale, how we will probably break even. He stated since we won’t have a large truck to sell every year, we would need to increase our rates to offset the increase in proposed increased fees from RMMSD. Wodalski explained the historical rate increases from RMMSD and how these are set on a year by year basis (not projected out long-term). Other rate calculation options were discussed. After further discussion it was agreed that Wodalski will bring back a couple of expense trends and bills from the past few years and project out 2026 from RMMSD as well and bring the chart back (with a G & H scenario). 14. Sanitary Sewer I & I Study Results [1:10:35 Zoom Recording] Member (PC) Voting Member (PC) Voting Valerie Parker updated @ 10/14/2026 1:39 PM Page 4 Mtg_BOT_261019_Consent_Minutes_PW261012W261012 Swenson gave an overview of the report from In-Pipe Technologies who performed an I & I study. Swenson explained that while the data collection portion is done, they are still working on getting us the full report yet. Swenson will follow up at the next meeting for presentation. Motion by Lopes-Serrao, second by Mumper, to acknowledge the Sanitary Sewer I & I Study Results. Yes Vote: 4 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS Zeyghami, Hooshang {Chair} YES Lopes-Serrao, Luis {Vice Chair} YES Hubbard, Tom ----- Jordan, Joe YES Mumper, Roy YES 15. Potential Utility Easement from Executive Ct to Kramer Ln [1:22:44 Zoom Recording] Wodalski explained that the property owner of 7209 Executive Court owns this property on the northeast corner of the cul-de-sac as well as the property that fronts Kramer Lane. This owner is looking to purchase a 30-33-foot strip of land from his neighbor to the north. He stated a thought was to use this area as a spot to loop our water main out to Kramer Lane in the future and asked if the Committee would want to have a utility easement reserved and work with the owner at the time of the sale or wait. He stated it would be a permanent easement. After some discussion it was agreed to have staff investigate this work. Motion by Mumper, second by Lopes-Serrao, to recommend that staff analyze the potential cost of an easement and bring back to subsequent action at a later meeting. Yes Vote: 4 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS Zeyghami, Hooshang {Chair} YES Lopes-Serrao, Luis {Vice Chair} YES Hubbard, Tom ----- Jordan, Joe YES Mumper, Roy YES 16. Engineering Design Contract for Volkman St (Bus 51 to McIntyre Ave) [1:25:27 Zoom Recording] Wodalski provided a summary of his report, explaining that the ask is for the $22,500 on the Business 51 to McIntyre section of Volkman. Motion by Mumper, second by Jordan, to approve having Becher Hoppe design the infrastructure work on Volkman St, between Business 51 and McIntyre, in the amount of $22,500. Yes Vote: 4 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS Member (PC) Voting Member (PC) Voting Valerie Parker updated @ 10/14/2026 1:39 PM Page 5 Mtg_BOT_261019_Consent_Minutes_PW261012W261012 Zeyghami, Hooshang {Chair} YES Lopes-Serrao, Luis {Vice Chair} YES Hubbard, Tom ----- Jordan, Joe YES Mumper, Roy YES 17. BUS 51 Storm Pond Construction Services Contract [1:27:40 Zoom Recording] Wodalski explained his report on this topic, and how we are working with Rothschild and Schofield on this project. He explained the cost sharing amongst the municipalities. He stated the proposal is to continue working with Stand Associates to oversee the construction work also continue assistance with the administration of the clean water fund loan. There was some discussion on the potential for a municipality to back out, which then everyone else would pick up. Motion by Lopes-Serrao, second by Mumper, to recommend the Village Board approve the contract amendment with Strand Associates for construction and clean water fund loan oversight for the WisDOT Storm Pond Project in the amount of $92,800, contingent on approval from our partner communities. Yes Vote: 4 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS Zeyghami, Hooshang {Chair} YES Lopes-Serrao, Luis {Vice Chair} YES Hubbard, Tom ----- Jordan, Joe YES Mumper, Roy YES 18. Draft 2027 Street Maintenance Plan [1:30:40 Zoom Recording] Wodalski commented on budget being set and how he and Blarek have been working on what streets to look at for 2027 and get bid packets out earlier. He then explained some of the projects we are looking at. Motion by Mumper, second by Jordan, to recommend the Village Board approve the 2027 Street Maintenance Plan as presented. Yes Vote: 4 No Votes: 0 Abstain: 0 Not Voting: 1 Result: PASS Zeyghami, Hooshang {Chair} YES Lopes-Serrao, Luis {Vice Chair} YES Hubbard, Tom ----- Jordan, Joe YES Mumper, Roy YES FUTURE ITEMS [1:34:23 Zoom Recording] 19. Next meeting date(s): a. Monday, November 9, 2026 @4:30 pm Regular Meeting b. Monday, December 14, 2026 @ 4:30pm Regular Meeting Member (PC) Voting Member (PC) Voting Member (PC) Voting Valerie Parker updated @ 10/14/2026 1:39 PM Page 6 Mtg_BOT_261019_Consent_Minutes_PW261012W261012 20. Topics for future meetings a. Watermain Replacement Wodalski stated we are working with MSA to get surveys back this fall, and hoping for an update for next month. 21. Remarks from Staff a. Wednesday, October 14, 2026 @ 5:30pm – Ross Ave (River Bend Rd to Pauls Ave) Public Information Meeting b. Wednesday, October 21, 2026 @ 4:00p m – Pints, Plows, & Smart Salting Policies Event Wodalski summarized the two October events. Gebert commented on the Farmer’s Market survey. She also pointed out the “Spooky Map” that we are doing to engage families and to let the public know where participating neighborhoods are for trick-of-treating along with seeing creative decorations. Swenson recognized Gilmeister for her great efforts she did for the Village. 22. Remarks from Committee Members Mumper commented that the presentation on utility cost was well done. 23. Announcements ADJOURNMENT Motion by Jordan, second by Mumper: to adjourn at 6:07 p.m. Hooshang Zeyghami, Village Trustee and Public Works & Utility Committee Chair Michael Wodalski, Public Works Director Valerie Parker, Recording Secretary From: jjjhrj111@aol.com To: Michael Wodalski Subject: Snow Plowing by Village of Weston Date: Tuesday, October 6, 2026 3:24:29 PM Hi Michael & Board of Trustees, my Husband & I are requesting that the Village plows the snow from Ross Avenue to High Ridge Circle on the West side of our home. I have had a number of discussions with Michael on the matter, however was told he needed to present to the Board. John & I live at 5700 High Ridge Circle & have been residents in the Village for 30 plus years. In addition, I ran a business in Weston for over 34 years, We have no sidewalk in the front of our home currently. Michael tells us we are required to plow the sidewalk. We never had a side walk for over 30 years on Fuller. I plowed this past Winter, as my Husband John has been disabled for over 40 plus years. This is not a safe situation, nor happy about it. Our road High Ridge Circle in one of the last roads to be plowed. Ross & Fuller is plowed early morning. I try to get the sidewalk cleared early morning , before packed down from people walking. To accomplish this, my choices are if not plowed go onto the black top road on High Ridge & plow down to Fuller. If High Ridge plowed, pull blower backwards down High Ridge to Fuller as can't run blower due to gravel. . This intersection has a stop sign on High Ridge where all the traffic from subdivision comes through. If our home faced Fuller , I could understand it would be our responsibility, Our home & the Anderson's are the only ones that do not face Fuller, everyone else does. I would like to know why the Village plows the sidewalk on Mesker Street? I have saw them plow numerous times Mesker Street that intersects with Lee Avenue. This is the exact situation as we have, duplex faces Lee Avenue. Why are the owner's & business's not responsible? My business was located on Schofield Avenue & this was also plowed by the Village , We are hoping you would review this matter & consider plowing this section of sidewalk. The Village plows all along Ross Avenue behind our subdivision BUT stops at Fuller Street. Looking forward to hearing back from you on this situation, Sincerely, Holly & John Jorgensen Date From 10/1/2026 and Date To 10/31/2026 and Template Meter Permits Issued Issue DatePermit Address Contractor Permit # ValuationOwner Name FeesParcel IDTemplate Finished Sq Ft Project Sq Ft Village of Weston 202601736 4504 Cedar Avenue, WESTON HUSKI PLUMBING & HEATING 10/27/2026192280816309 42 SURVIVOR'S TRUST $600.00Meter 0 506 Village of Weston Permits Valuation Village of Weston Permits Fees Village of Weston Permits Issued 1 $600 Village of Weston Permits Finished SqFt 0 Village of Weston Permits Project SqFt 1Total Permits Issued Total Permits Fees Total Permits Valuation $600 Total Finished Sq Ft Total Project Sq Ft 0 Date From 10/1/2026 and Date To 10/31/2026 and Template Lateral Permits Issued Issue DatePermit Address Contractor Permit # ValuationOwner Name FeesParcel IDTemplate Finished Sq Ft Project Sq Ft Village of Weston 202601639 5700 Quartz Trail Road, WESTON Timber Ridge Builders LLC. 10/12/2026192280822201 59 TIMBER RIDGE BUILDERS LLC $50.00Lateral 0 503 202601640 5706 Quartz Trail Road, WESTON Timber Ridge Builders LLC. 10/12/2026192280822201 60 TIMBER RIDGE BUILDERS LLC $50.00Lateral 0 503 202601641 5712 Quartz Trail Road, WESTON Timber Ridge Builders LLC. 10/12/2026192280822201 61 TIMBER RIDGE BUILDERS LLC $50.00Lateral 0 503 202601642 5716 Quartz Trail Road, WESTON Timber Ridge Builders LLC. 10/12/2026192280822201 62 TIMBER RIDGE BUILDERS LLC $50.00Lateral 0 503 202601632 3509 Ross Avenue, WESTON Steve's Plumbing and Heating 10/09/2026192280817100 73 TEREK HARTEAU $5,340 $40.00Lateral 0 503 Village of Weston Permits Valuation Village of Weston Permits Fees Village of Weston Permits Issued 5 $240 $5,340 Village of Weston Permits Finished SqFt 0 Village of Weston Permits Project SqFt 5Total Permits Issued Total Permits Fees Total Permits Valuation $240 $5,340 Total Finished Sq Ft Total Project Sq Ft 0 REQUEST FOR CONSIDERATION REQUEST FOR CONSIDERATION PAGES 1 OF 7 Public Mtg/Date: Public Works Committee – 10/12/2026 Description: Capital Improvement Plan Update From: Michael Wodalski, Director of Public Works Question: Solely an update on project status Background Current Capital Improvement Plan Projects Below is an update on the status of the various Capital Improvement Plan Projects that are ongoing. - Street Projects: 1. Weston Ave (CR-X to CR-J):  East Construction Phase: 100% Complete  West Construction Phase 100% Complete  West Construction Phase 2 – Substantially Complete  Consultant: AECOM  Contractor: Integrity Grading and Excavating Working on getting final assessments calculated. 2. Schofield Ave (Normandy Ave to Birch St): $2,652,390 in Grant Funds  Total Project Cost ~$7,668,000  Construction Year: 2025 – Substantially Complete  Consultant: Clark Dietz  Contractor: Haas Nearly wrapped up and will work on Special Assessments this fall. Trerweiler will come back in spring of 2027 to repair/replace any remaining concrete approaches and slabs that need to be replaced. 3. Alderson St and Jelinek Ave Intersection:  Estimated Project Cost ~ $1,080,000  Construction Year: 2026  Consultant: Village / MSA  Contractor: Haas This project is complete. REQUEST FOR CONSIDERATION REQUEST FOR CONSIDERATION PAGES 2 OF 7 Figure 1: Aerial View of Alderson and Jelinek Intersection 4. Bloedel Ave:  Estimated Project Cost ~ $1,920,000  Construction Year: 2026  Consultant: Village  Contractor: Francis Melvin REQUEST FOR CONSIDERATION REQUEST FOR CONSIDERATION PAGES 3 OF 7 Project is substantially completed. Figure 2: Bloedel Ave looking west towards Cherry St. 5. Concord Ave and Bayberry St:  Construction Year: 2026  Consultant: Village  Contractor: Haas This project is nearing completion. Binder layer of asphalt has been paved and the contractor is currently working on adjusting watervalves and manholes. Final paving should be the week of 11/9. Concrete work will continue into the week of 10/12 and asphalt work is anticipated to start likely later the week of 10/19. Figure 3: Concord Ave just west of CR-X looking west. Concrete shoulder started on 10/7. REQUEST FOR CONSIDERATION REQUEST FOR CONSIDERATION PAGES 4 OF 7 6. Ross Ave (Metro Dr/Pine St to Alderson St): $2,634,977 in Grant Funds  Total Project Cost Estimate ~ $4,271,800  Consultant: Becher Hoppe  Anticipate Construction in 2027 per DOT agreement Design work is ongoing. ROW acquisition is the main task right now. Project is slated for bidding early next year. 7. Ross Ave (River Bend to Pauls): $2,211,598 in Grant Funds  Estimated Project Cost ~ $4,986,600  Construction Year: ~2028  Consultant: Becher Hoppe Working with the Town on the agreement. I have a draft in the November packet for Public Works 8. Fuller St Reconstruction:  Total Project Cost ~ $4,239,000  Construction Year: 2025 – Substantially Complete  Consultant: Becher Hoppe  Contractor: Francis Melvin There is punch-list work yet to be completed this fall. 9. Ross Ave and CR-X Intersection: $2,352,000 in Grant Funds  Estimated Project Cost ~ $2,952,000  Construction Year: ~2028  Consultant: SEH Design work is progressing. There is a proposal from SEH for a separate design contract for the Sternberg intersection. 10. Business 51 (Volkman St to Schofield Ave):  Construction Year: 2029/30  Consultant: Becher Hoppe Becher Hoppe has submitted the 30% plans to the DOT. There is an item in the packet about adding a crosswalk at Neupert Ave. 11. Business 51/STH 29 Storm Pond:  Construction Year: 2026/27  Consultant: Strand I am working with the DNR and Strand to get our Clean Water Fund Loan put together. The goal was to bid this project over winter and have it start next year. There is an Intergovernmental Agreement in the packet for the REQUEST FOR CONSIDERATION REQUEST FOR CONSIDERATION PAGES 5 OF 7 construction of the pond. This agreement then would supersede the existing agreement for design of the pond. 12. Ferge, Post and Delonay:  Construction Year: 2027  Design Engineer: Village Ike has begun preliminary design work. American Engineering and Testing will be out in the next week or so gathering soil borings. 13. Howland Ave:  Construction Year: 2027  Design Engineer: Village Ike has begun preliminary design work. American Engineering and Testing will be out in the next week or so gathering soil borings. - Utility Projects: 1. Well 4 PFAS Treatment:  Construction Cost: $2,821,651 • Principal Forgiveness Amount: $1,790,743.00 • Net Loan Amount: $767,460.00  Construction Year: 2025 – Substantially Complete  Consultant: AECOM  Contractor: August Winter The GAC Tanks have been installed and water has been pumping to the system as of 10/24/2025. Working on getting this project closed out as all items have now been completed. 2. Well 3 Iron, Manganese and PFAS Treatment:  Construction Cost: $4,576,735 • Principal Forgiveness Amount: $3,012,992.00 • Net Loan Amount: $1,291,283.00  Construction Year: 2026  Consultant: AECOM  Contractor: 8Pine Construction has started on the addition to the treatment plant for iron and manganese removal. Substantial Completion is anticipated in April 2027. 3. Cedar Creek Interceptor Access Road:  Construction: Anticipate TBD  Consultant: Mi-Tech/TBD Will be working on easements. REQUEST FOR CONSIDERATION REQUEST FOR CONSIDERATION PAGES 6 OF 7 4. Bellewood Ave Watermain Replacement:  Construction Year: 2026  Consultant: Village/MTS  Contractor: No bids were received on this project. It appears Rothschild will be postponing the repaving of Bellewood to next year so we can rebid the project and replace the watermain next year instead. 5. Military Road:  Construction Year: 2026  Consultant: MSA  Contractor: Steen Construction Project is complete. - Subdivision Projects: 1. Hinner Springs:  Construction Year: 2026  Developer: Timber Ridge Builders Timber Ridge Builders are proposing an additional phase within the Hinner Springs Subdivision to extend several more lots along Green Pastures and are also looking to create 2 lots off of Birch St between Birchwood Highlands and Green Pastures. 2. Green Tree Acres:  Construction Years: 2025-TBD  Developer: Green Tree Builders Green tree will be starting Phase 3 work this fall/winter. They did encounter some rock that they will need to blast in order to get the sanitary sewer installed at the correct depth. 3. Granite Ridge Subdivision:  Construction: 2026 - TBD  Developer: Timber Ridge Builders Timber Ridge has completed the infrastructure within Phase 1 of the subdivision. If home sales go well, we anticipate seeing Phase 2 work starting in spring. Attached Docs: Committee Action: N/A Fiscal Impact: Recommendation: REQUEST FOR CONSIDERATION REQUEST FOR CONSIDERATION PAGES 7 OF 7 Recommended Language for Official Action No Action is needed, solely a discussion item. Or, Something else _____________________________________________________________________ Additional action: STAFF REPORT STREET SUPERINTENDENT REPORT PAGES 1 OF 11 Public Mtg/Date: Public Works Committee – 11/9/2026 Description: Street Operations Update From: Forrest Blarek, Street Superintendent Question: Solely an update on project status Background Current Street Operations Project: • DPW installed a storm sewer next to the number 7-8 well and disc golf course. They also did the grading around the building for better drainage. STAFF REPORT STREET SUPERINTENDENT REPORT PAGES 2 OF 11 • Crew memebers did some cleaning out and structuring of the outfall pipe at the end of Cathy St. • The area needed to be redefined as a basin to let debris separate from the water. • The outfall pipes flow line was also fixed as the concrete was deterating. • Not pictured: The shop made a trash guard for this outfall to help catch debris and also stop kids from going into the structure which the neighbors that live next to this said they saw kids playing in the pipe. This guard is in place. STAFF REPORT STREET SUPERINTENDENT REPORT PAGES 3 OF 11 • DPW along with RC Pavers did the overlay of the North bound East lane stretch of Heeren St from Shorey Ave to Harney Ave. • RC Pavers was contracted with their paver and roller to pave this section and for the Village to haul the asphalt which in turn saved money for this project. • Pictured on the bottom is a cross culvert on Harney Ave which needed replacement and since that section of road was getting paved DPW staff replaced it and included it with the overlay project. STAFF REPORT STREET SUPERINTENDENT REPORT PAGES 4 OF 11 • DPW shouldered streets. • Staff coordinated the time frame to get projects wrapped up before the yard waste pick up was scheduled and the weather cooperated. STAFF REPORT STREET SUPERINTENDENT REPORT PAGES 5 OF 11 • DPW crew did the restoration work on a water valve that was replaced on the corner of Corozalla Dr and Mesker St. • Crew poured back the concrete curb and did the topsoil and seeding in this area. STAFF REPORT STREET SUPERINTENDENT REPORT PAGES 6 OF 11 • Fall curbside yard waste pick up started up. • This task requires a minimum of 4 DPW staff members. • There are 2 operators to run the 2 vac trucks and 2 operators for the brush collection which requires an end loader and a dump truck. • The 2 vac trucks are averaging 10 loads each per day and the capacity of these boxes are 20 cubic yards. Depending on the route and area we are in, we do use nearby Village properties for dump sites such as Kennedy Park for quicker turnaround times to help us try to stay on schedule. These sites get cleaned up on later dates and when staff members are freed up. STAFF REPORT STREET SUPERINTENDENT REPORT PAGES 7 OF 11 • Pictured is Shirely Ave which the Village DPW crew reconstructed which was completed in July. • RC Pavers was contracted to do the paving of this project. • This combination of in-house labor and contracted services provides the Village with a practical approach to managing road construction projects. It allows the Village to maximize its existing resources, reduce the need for additional equipment investments, and still obtain professional paving services to complete the project. STAFF REPORT STREET SUPERINTENDENT REPORT PAGES 8 OF 11 STAFF REPORT STREET SUPERINTENDENT REPORT PAGES 9 OF 11 Fleet & Equipment Maintenance Update Pictured from left to right: First Picture: Unit 24 Unit 24, the John Deere grader, is currently being prepared for the winter season. The wheels have been removed for sandblasting and repainting, and new tires will be installed on the rear drive axle once that work is complete. Minor rust repairs are also being performed on the door jams and rear section of the machine. Several mechanical repairs have been completed, including the replacement of worn tie rod ends. During service, excessive copper filings were found in the turntable fluid. The turntable was disassembled, thoroughly cleaned, and inspected to ensure all components were in good condition. The unit has also received complete service and inspection. Once work is finished, the snow wing will be installed, so the grader is ready for winter operations. Second Picture: Unit 81 Street sweeper Unit 81 is undergoing routine maintenance to keep it in service and operating reliably. As shown in the photo, the unit is receiving a new center broom, one new curb broom, and new rubber curtains. These replacements will improve sweeping performance during operation. The bottom pictures: Units 961, 962(Leaf Vacs), 60, and 29 (Truck Units)– Leaf Vac Operations The leaf vac fleet continues to receive extensive daily maintenance to ensure reliable operation throughout the collection season. Each truck and leaf vac combination receives STAFF REPORT STREET SUPERINTENDENT REPORT PAGES 10 OF 11 approximately two labor hours of preventive maintenance every day per unit. Daily maintenance tasks include: • Washing the radiators on both the leaf vac and truck. • Performing a general inspection of each unit to identify potential issues. • Greasing components and checking engine oil and coolant levels on both the truck and leaf vac. • Cleaning or replacing engine air filters and cab air filters as needed. • Thoroughly washing both units, with special attention given to cleaning the exhaust screens on the leaf vac. • Refueling all units. Overall, the leaf vac fleet has experienced only minor mechanical issues this season. One unit required replacement of the PTO engagement module, while another required a new safety switch after a malfunction. Unit 60 also required an air conditioning system recharge. Despite these repairs, the Leaf vacs performed well during the fall leaf collection season. Additional Work Completed • Unit 25(quad axel): Replaced a faulty air brake valve. • Unit 202 (1-Ton Truck): Completed service and inspection, installed new tires, washed the truck, and applied undercoating. • Unit 9(Tandem plow truck): Completed winter preparation, including all scheduled maintenance and inspections. • Front-End Loader Plows: Completed preseason service and maintenance to ensure readiness for winter operations. • Cathy Drive Culvert: Fabricated a new culvert grate. • Fall Surplus Auction: Continued preparation of equipment and materials for the upcoming surplus auction. STAFF REPORT STREET SUPERINTENDENT REPORT PAGES 11 OF 11 In addition to routine fleet maintenance, the shop has remained focused on winter equipment preparation, Fall clean-up maintenance and surplus asset Auction. + UTILITY REPORT FOR OCTOBER 2026 1. Superintendent Comments a. Water  Well 2 replace chlorine pump feed line  Well 5 dehumidifier maintenance  Well 6 dehumidifier maintenance  Well 7/8 Fluoride pump maintenance  Treatment Plant replace filt er bags prior to PFAS system  Business Park Tower full dr ain down interior cleaning  Completed multiple fire flow tests that were requested  Fixed hydrant that had a broken nozzle (Photo in report).  Cleared all of our non-draining hydrants in preparation for winter  Conducted our annual large meter testing  Cleaned out valve stacks noted after flushing operations were completed  Lead and Copper confirmation subm itted to DNR. Letters going to residents asap.  Operators assisted with utilit y requests on Bloedel, Concord and Military Projects.  Unidirectional Watermain flushi ng operations were completed.  Numerous lateral inspections wer e completed. (Photo in report).  Meter Card maint enance continued.  Private Well sampling collected. LATERAL INSPECTION(S) DAMAGED HYDRANT b. Sewer  Heritage Hills Lift Station replaced check valve  River Park Lift Station ATS troubleshooting  Pointe List Station pump maintenance  Well 7/8 Lift Station pump maintenance  I&I Study final report received . IN-PIPE presentation at Nov. Public Works Meeting.  Sanitary Sewer jetting operations completed  Clean, collect pH Probe data also re-calibrated probes.  Clean bad spots.  Lift Station Cleaning fo r fall was completed.  Lift Station(s) standby gener ator general maintenance.  Lift Station(s) standby generat or battery maintenance conducted.  Lift Station(s) pump f ilters cleaned/replaced. c. Diggers Hotline Locates  Village Utility Operators mark ed approximately 198 locates. Many communication installations, project planning as well as upgrades to WPS gas lines. d. Work Orders  Village Utility Operators comp leted 22 Work Orders. The majority of work orders were for various water meter installations, meter communication issues, lateral inspections and water quality responses. e. Contract Work/Activi ties Completed/Upcoming  Permanent PFAS project for Well #3/Treatment Plant ongoing.  Entered Monthly we ll data to DNR.  Street/Subdivision Projects: Gr een Tree Acres ongoing, Grantie Ridge ongoing, Bloedel Ave. Reconstruction and Concord/Bayberry Reconstruction.  Business Park Tower exterior cleaning and interior cleaning completed.  Valve Exercising program continues during flushing.  Water main flushing completed.  Sanitary Sewer jetting completed.  Lift Station cleaning for fall completed. 2. Customers Added New customers added during the month. *A new customer includes new connections and change in residences Type No. of Customers Residential Single Family/Condo's 43 Multi Family 2 Commercial/Industrial 8 Total 53 3. Water Pumped in 1,000s of gallons (Last 4 Months) The Well #3 (Offline since 2022) portion of Treatment Plant project ongoing. Alta Verde (#1) Kerry (#2) Mesker (#3) Sternberg (#4) Bloedel (#5) July Total - 22,778 - 23,721 - Peak - 863 - 1,119 - August Total 15 20,393 - 23,107 22 Peak 15 949 - 923 22 September Total - 23,986 - 18,761 - Peak - 947 - 765 - October Total - 22,864 - 15,429 - Peak - 871 - 617 - 15 90,021 - 81,018 22 Rippling Creek (#6) Well #7 Well #8 TOTALS July Total 9,371 14,896 15,024 85,790 Peak 505 678 682 481 August Total 9,512 14,785 15,875 83,709 Peak 415 617 957 487 September Total 2,949 11,803 11,815 69,314 Peak 268 482 496 370 October Total 5,914 9,133 9,129 62,469 Peak 293 478 565 353 27,746 50,617 51,843 Total gal X 1000 301,282 Total gal X 1000 (Less Foremost) 211,261 4. Wastewater Flows (Last 4 Months) Rib Mountain Metropolitan Sewerage District Flow Charge Totals. Bus. 51 Flow (X1000) Cedar Creek Flow (X1000) Total Flow Charge (X1000) July Total 18,772 15,128 33,900 August Total 17,569 14,547 32,116 September Total 17,916 13,914 31,830 October Total 21,137 16,619 37,756 75,394 60,208 135,602 5. Lift Station Hours Summary of Lift Station Hours for last two months. Lift Station Hours 2026 Harlyn Fox St. Mesker/Jelinek Kathleen E.C. River Month Pump 1 Pump 2 Pump 1 Pump 2 Pump 1 Pump 2 Pump 3 Pump 1 Pump 2 Pump 1 Pump 2 Sep 68.5 72 56.5 54.7 51.7 53.2 53.6 3.8 3.1 40.1 40.5 Oct 64.6 65.1 53.8 51.8 50.9 53.2 52.9 5.8 3.9 40 40.1 2026 Tanya/Tricia Progress Way Pointe Park Terrace Ryan St. Month Pump 1 Pump 2 Pump 1 Pump 2 Pump 1 Pump 2 Pump 1 Pump 2 Pump 1 Pump 2 Pump 3 Sep 40 31.7 4.6 4.8 22.9 36.3 7.8 18.2 25.1 41.1 38.8 Oct 37 31 4.27 5.5 27.8 50.2 9.1 21.6 24.3 40.1 37.8 2026 Heritage Hills Ross Ave. Mesker/Colleen Trotzer Month Pump 1 Pump 2 Pump 1 Pump 2 Pump 1 Pump 2 Pump 1 Pump 2 Sep 17.6 17.8 26.3 26.5 119 124.1 0.6 0.6 Oct 19.6 18.9 24.4 24.6 110.8 113.3 0.5 0.3 REQUEST FOR CONSIDERATION REQUEST FOR CONSIDERATION PAGES 1 OF 7 Public Mtg/Date: Public Works Committee – 10/12/2026 Description: Sanitary Sewer Rate Increase From: Michael Wodalski, PE - Director of Public Works Josh Swenson – Utility Superintendent Question: Should the Public Works Committee recommend the Village Board increase the sanitary sewer utility rates? Background I have the information from the October 12, 2026 Public Works Meeting below. Following that meeting I was asked to look at creating two other options. - Option G which is an average cost between Option D (Break Even) and Option F (Next Community). Option G provides a total Revenue of $2,451,473 and a net income of $160,132. - Option H is an average of Options D, E and F. (Option E was the average cost of surrounding communities in 2026). With Option H, total revenue goes to $2,417,788 and net income of $113,083. I have an updated table below showing these two additional options: Scenario Total Revenue Total Expenses Net Income A $3,141,684 $3,925,000 - $783,316 B $3,402,768 $3,925,000 -$522,232 C $3,533,762 $3,925,000 -$391,238 D $3,926,746 $3,925,000 $1,746 E $3,948,840 $3,925,000 $23,840 H $4,038,083 $3,925,000 $113,083 G $4,085,132 $3,925,000 $160,132 F $4,243,518 $3,925,000 $318,518 Since last meeting, I also found out that the City of Stevens Point will be changing their sanitary sewer rates starting in 2027, which will put their 2027 rate between Rothschild and Mosinee. I believe this shows all of our communities are seeing increased costs and eventually rates will need to be adjusted to keep up. The City of Merrill also has a smaller increased planned for 2027. I’ve updated the regional comparisons on the next page to show where the proposed options are in relation to the updated information from the neighboring communities. REQUEST FOR CONSIDERATION REQUEST FOR CONSIDERATION PAGES 2 OF 7 $- $20.00 $40.00 $60.00 $80.00 $100.00 $120.00 $140.00 $160.00 Central WI Sewer Quarterly Utility Rates based on a 12,000 gallon bill (updated 11/3/26) REQUEST FOR CONSIDERATION REQUEST FOR CONSIDERATION PAGES 3 OF 7 After the October Public Works Meeting I was also asked to take a look at the historic costs from RMMSD. Below is a table from 2014 through the projected 2027 budget. Since 2014, total increase is nearly $1.4 Million and since 2023, increase is a little over $700,000. The major Capital/Debt costs started in 2024, which was an immediate $430,000 increase for Weston in 2024. $- $500,000 $1,000,000 $1,500,000 $2,000,000 $2,500,000 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026* 2027** RMMSD Operating and Capital Costs (2014 - 2027) Operating Capital REQUEST FOR CONSIDERATION REQUEST FOR CONSIDERATION PAGES 4 OF 7 Looking at the graph in the previous page you can see in the 2014 through 2018 timeframe there was some yearly variation in the RMMSD costs, but an increase one year didn’t necessarily mean an increase the following year. We then saw a larger increase in 201, but then a decrease again in 2020 and 2021. Once we got to 2024 though the thought was lets wait to see if 2025 or 2026 brings about a decrease similar to what we had seen historically, but that does not appear to be the case moving forward and we inevitably need to make a change to rates to account for the increased costs to the sanitary sewer utility. PUBLIC WORKS 10/12/2026 Meeting Information The Village of Weston’s Sanitary Sewer Utility Rates were last increased in January of 2025. This adjustment was made due to the sewer utility running at a deficit and trying to break even from the increase in costs from the Rib Mountain Metropolitan Sewerage District (RMMSD) fees which are related to their treatment plant construction project. Roughly 90% of the Village’s wastewater flows to and is treated by RMMSD thus, when the bills from RMMSD go up, the Village’s sanitary sewer costs go up. At the end of 2025, the Sanitary Sewer Utility operated at a loss of $440,571 for the year. For 2026, the Sanitary Sewer Utility as of the end of August is at a positive $96,201, however the Village did sell our older Sewer Vac Truck in March of 2026 for $352,500, thus without that sale, the sewer utility is operating at a loss of $256,299. Heading to year end, we’re projecting we’ll be likely around a loss of $400,000 if we remove the sale of the old vac truck. Since we don’t have a vac truck to sell every year we will need to increase the sewer rates to offset the increase in fees from RMMSD. The Village received RMMSD’s preliminary 2027 budget, which forecasts an additional $100,000 in costs for the Village of Weston Sanitary Sewer. As I look at projecting out to next year I looked at 5 potential options to see what the potential revenue and expenses would be. I have the options laid out below. To make the calculations I used the following assumptions: - Projected 2027 expenses = $3,925,000 - Total number of equivalent meters (3/4-inch meters) = 8,048 (2026 YTD count) - Total 1,000s of gallons of sewer billed = 374,270.60 (this was the 2025 actual) - Estimated Non-Operating Revenue = $325,000 Sanitary sewer bills are calculated off of a base fee which is determined by the size of the meter serving the property. Then there is a consumption fee which is calculated based on every 1,000 gallons of water used. REQUEST FOR CONSIDERATION REQUEST FOR CONSIDERATION PAGES 5 OF 7 There are many different options to adjust the sewer rate, but for preliminary analysis I moved forward with 5 scenarios which are: A) Do Nothing (-$783,316) – This scenario does not adjust current rates and was more for seeing what the projected deficit for 2027 would be if the rate does not change. B) 33% Recovery (-$522,232) – This would be a 3-step approach to breaking even where we’d recover 33% of the deficit in 2027 and then recover another third in 2028 and the last third in 2029 where then revenues would match expenses. C) Half Recovery (-$391,238) – This would be a 2-step approach to breaking even where we’d look to recover 50% of the deficit in 2027 and then revaluate for 2028 with likely a second increase to cover the remaining 50%. D) Break Even ($1,746) – this was the rates we’d need to charge to have the sewer utility break even in 2027. The goal of this would be to have revenues match expenses in 2027. E) Average Rates for Area Communities ($23,840) – This scenario put our rates at the average for the area communities for 2027. Overall, this scenario is a little more than the break even scenario, but does project a slight positive net income. F) Compare to the next highest community above break even ($318,518) – If we wanted to have some positive net income in 2027, but didn’t want to change our positioning with our neighboring communities at a break even point. This scenario would leave us just under a quarterly cost for the Village of Kronenwetter. A table of those scenarios is shown below: Scenario Total Revenue Total Expenses Net Income A $3,141,684 $3,925,000 - $783,316 B $3,402,768 $3,925,000 -$522,232 C $3,533,762 $3,925,000 -$391,238 D $3,926,746 $3,925,000 $1,746 E $3,948,840 $3,925,000 $23,840 F $4,243,518 $3,925,000 $318,518 When looking at neighboring communities in Central Wisconsin, and assuming an average residential property uses 12,000 gallons of water a quarter, the bill for a Weston Utility customer is currently $89.25, which is the 3 rd lowest in the area out of 11 communities. If we look at a stepped approach, Weston would still be the 3rd lowest community in 2027. If we wanted to get to a break-even point, Weston would move to the 5th lowest community or (5 of 11). The last scenario shows what an approximate rate would be for Weston if we got close to the 6 th community, but still stayed slightly REQUEST FOR CONSIDERATION REQUEST FOR CONSIDERATION PAGES 6 OF 7 under. That scenario has a positive net income over $318,000. The figures below show this data in a tabular and graphical format. Table 1: Central WI Sanitary Sewer Rates as of 9/15/26 $- $20.00 $40.00 $60.00 $80.00 $100.00 $120.00 $140.00 $160.00 Central WI Sewer Quarterly Utility Rates based on a 12,000 gallon bill (updated 9/15/26) REQUEST FOR CONSIDERATION REQUEST FOR CONSIDERATION PAGES 7 OF 7 There are many different combinations we can make, but I’d like to get this discussion started here so we can look at where we want to be by the end of 2027. We’ve been using up fund balance the last several years running at a deficit and should look at breaking even at a minimum in the near future as it’s not sustainable to keep the rates where they are currently. Staff is looking for guidance on the scenarios and other opinions the committee may have. Rib Mountain does have a separate sewer charge for industrial users, which is a higher rate than residential and commercial users. That is another option we could look at, but is not as common. Attached Docs: - See above tables and graphs - Scenario Calculations __________ ____________________________________________________________ Committee Action: - Public Works previously recommended an increase in 2024 Fiscal Impact: - Sewer utility is projected to have a deficit of $783,316 in 2027. _______________ ____________________________________________________________________________ Recommendation: Staff recommends moving forward with a rate increase for 2027 and is looking for feedback from the Committee on how best to move forward. A breakeven increase would raise a residential quarterly bill by $25.07. Recommended Language for Official Action I Move to _______________________ . Or, Something else ____________________________________________________________________ Additional action: Weston Sewer Utility 11/04/26 2027 Financial Projections Projected Total Expenses for 2027 3,925,000$ 325,000$ 3,600,000$ 1,113,753$ 2,486,247$ 1,702,931$ (Based on 2025 flow) Units Billed in (1000's of gallons) = 374,270.6 @ $4.55 (783,316.0) Shortfall Estimated 2027 Base Charge Revenues with $0.00/1000 Increase Base charges increased ±0% Customer count as of 12/31/25 Meter Size Rate/Qtr. Base Charge Ratio (multiple of 5/8") Number of Meters Equivalent Meters Total Annual Charges 5/8" / 3/4" $34.65 1.0 5,859 5,859.0 812,057 $ 1" $103.43 3.0 147 441.0 60,817 $ 1 1/2" $206.85 6.0 136 816.0 112,526$ 2" $344.40 10.0 40 400.0 55,104 $ 3" $791.70 23.0 12 276.0 38,002 $ 4" $1,411.20 41.0 4 164.0 22,579 $ 6" $3,166.80 92.0 1 92.0 12,667$ Totals 6,199.0 8,048.0 1,113,753$ Revenue Excess/(Shortfall) (783,316)$ Increase in Base Rate Needed (%) 70.33% Increase in total equivalent meters needed 5,652 Increase in volume charges to meet total revenue target 31.51% Average Residential Bill (48,000 gallons per year) Base Charge 34.65$ Volume Charge 54.60$ Total 89.25$ 0.00% Projected Non-operating (Other) Income Required Operating Revenue from metered sales = Estimated Revenue from Base Charges Required Revenue from Volume Charges = Estimated Revenue from Volume Charges = Revenue Excess (Shortfall) from metered sales = 2027 Estimate: Option A - Do Nothing % Change from '26 Weston Sewer Utility 11/04/26 2027 Financial Projections Projected Total Expenses for 2027 3,925,000$ 325,000$ 3,600,000$ 1,225,128$ 2,374,872$ 1,852,640$ (Based on 2025 flow) Units Billed in (1000's of gallons) = 374,270.6 @ $4.95 (522,232.5) Shortfall Estimated 2027 Base Charge Revenues with $0.40/1000 Increase Base charges increased ±10% Customer count as of 12/31/25 Meter Size Rate/Qtr. Base Charge Ratio (multiple of 5/8") Number of Meters Equivalent Meters Total Annual Charges 5/8" / 3/4" $38.12 1.0 5,859 5,859.0 893,263 $ 1" $113.77 3.0 147 441.0 66,899$ 1 1/2" $227.54 6.0 136 816.0 123,779$ 2" $378.84 10.0 40 400.0 60,614$ 3" $870.87 23.0 12 276.0 41,802$ 4" $1,552.32 41.0 4 164.0 24,837$ 6" $3,483.48 92.0 1 92.0 13,934$ Totals 6,199.0 8,048.0 1,225,128$ Revenue Excess/(Shortfall) (522,232)$ Increase in Base Rate Needed (%) 42.63% Increase in total equivalent meters needed 3,425 Increase in volume charges to meet total revenue target 21.99% Average Residential Bill (48,000 gallons per year) Base Charge 38.12$ Volume Charge 59.40$ Total 97.52$ 9.26% Projected Non-operating (Other) Income Required Operating Revenue from metered sales = Estimated Revenue from Base Charges Required Revenue from Volume Charges = Estimated Revenue from Volume Charges = Revenue Excess (Shortfall) from metered sales = 2027 Estimate: Option B - 33% Recovery % Change from '26 Weston Sewer Utility 11/04/26 2027 Financial Projections Projected Total Expenses for 2027 3,925,000$ 325,000$ 3,600,000$ 1,225,128$ 2,374,872$ 1,983,634$ (Based on 2025 flow) Units Billed in (1000's of gallons) = 374,270.6 @ $5.30 (391,237.8) Shortfall Estimated 2027 Base Charge Revenues with $0.75/1000 Increase Base charges increased ±10% Customer count as of 12/31/25 Meter Size Rate/Qtr. Base Charge Ratio (multiple of 5/8") Number of Meters Equivalent Meters Total Annual Charges 5/8" / 3/4" $38.12 1.0 5,859 5,859.0 893,263 $ 1" $113.77 3.0 147 441.0 66,899$ 1 1/2" $227.54 6.0 136 816.0 123,779$ 2" $378.84 10.0 40 400.0 60,614$ 3" $870.87 23.0 12 276.0 41,802$ 4" $1,552.32 41.0 4 164.0 24,837$ 6" $3,483.48 92.0 1 92.0 13,934$ Totals 6,199.0 8,048.0 1,225,128$ Revenue Excess/(Shortfall) (391,238)$ Increase in Base Rate Needed (%) 31.93% Increase in total equivalent meters needed 2,566 Increase in volume charges to meet total revenue target 16.47% Average Residential Bill (48,000 gallons per year) Base Charge 38.12$ Volume Charge 63.60$ Total 101.72$ 13.97% Projected Non-operating (Other) Income Required Operating Revenue from metered sales = Estimated Revenue from Base Charges Required Revenue from Volume Charges = Estimated Revenue from Volume Charges = Revenue Excess (Shortfall) from metered sales = 2027 Estimate: Option C - Half Recovery % Change from '26 Weston Sewer Utility 11/04/26 2027 Financial Projections Projected Total Expenses for 2027 3,925,000$ 325,000$ 3,600,000$ 1,225,128$ 2,374,872$ 2,376,618$ (Based on 2025 flow) Units Billed in (1000's of gallons) = 374,270.6 @ $6.35 1,746.4 Excess Estimated 2027 Base Charge Revenues with $1.80/1000 Increase Base charges increased ±10% Customer count as of 12/31/25 Meter Size Rate/Qtr. Base Charge Ratio (multiple of 5/8") Number of Meters Equivalent Meters Total Annual Charges 5/8" / 3/4" $38.12 1.0 5,859 5,859.0 893,263 $ 1" $113.77 3.0 147 441.0 66,899 $ 1 1/2" $227.54 6.0 136 816.0 123,779$ 2" $378.84 10.0 40 400.0 60,614 $ 3" $870.87 23.0 12 276.0 41,802 $ 4" $1,552.32 41.0 4 164.0 24,837 $ 6" $3,483.48 92.0 1 92.0 13,934$ Totals 6,199.0 8,048.0 1,225,128$ Revenue Excess/(Shortfall) 1,746$ Increase in Base Rate Needed (%) -0.14% Increase in total equivalent meters needed (11) Increase in volume charges to meet total revenue target -0.07% Average Residential Bill (48,000 gallons per year) Base Charge 38.12$ Volume Charge 76.20$ Total 114.32$ 28.08% Projected Non-operating (Other) Income Required Operating Revenue from metered sales = Estimated Revenue from Base Charges Required Revenue from Volume Charges = Estimated Revenue from Volume Charges = Revenue Excess (Shortfall) from metered sales = 2027 Estimate: Option D - Break Even % Change from '26 Weston Sewer Utility 11/04/26 2027 Financial Projections Projected Total Expenses for 2027 3,925,000$ 325,000$ 3,600,000$ 1,269,678$ 2,330,322$ 2,354,162$ (Based on 2025 flow) Units Billed in (1000's of gallons) = 374,270.6 @ $6.29 23,840.3 Excess Estimated 2027 Base Charge Revenues with $1.74/1000 Increase Base charges increased ±14% Customer count as of 12/31/25 Meter Size Rate/Qtr. Base Charge Ratio (multiple of 5/8") Number of Meters Equivalent Meters Total Annual Charges 5/8" / 3/4" $39.50 1.0 5,859 5,859.0 925,745 $ 1" $117.91 3.0 147 441.0 69,331$ 1 1/2" $235.81 6.0 136 816.0 128,280$ 2" $392.62 10.0 40 400.0 62,819$ 3" $902.54 23.0 12 276.0 43,322$ 4" $1,608.77 41.0 4 164.0 25,740$ 6" $3,610.15 92.0 1 92.0 14,441$ Totals 6,199.0 8,048.0 1,269,678$ Revenue Excess/(Shortfall) 23,840$ Increase in Base Rate Needed (%) -1.88% Increase in total equivalent meters needed (151) Increase in volume charges to meet total revenue target -1.02% Average Residential Bill (48,000 gallons per year) Base Charge 39.50$ Volume Charge 75.48$ Total 114.98$ 28.83% Required Operating Revenue from metered sales = 2027 Estimate: Option E - Average in Area Estimated Revenue from Volume Charges = Projected Non-operating (Other) Income Estimated Revenue from Base Charges Required Revenue from Volume Charges = Revenue Excess (Shortfall) from metered sales = % Change from '26 Weston Sewer Utility 11/04/26 2027 Financial Projections Projected Total Expenses for 2027 3,925,000$ 325,000$ 3,600,000$ 1,392,191$ 2,207,809$ 2,526,327$ (Based on 2025 flow) Units Billed in (1000's of gallons) = 374,270.6 @ $6.75 318,517.5 Excess Estimated 2027 Base Charge Revenues with $2.20/1000 Increase Base charges increased ±25% Customer count as of 12/31/25 Meter Size Rate/Qtr. Base Charge Ratio (multiple of 5/8") Number of Meters Equivalent Meters Total Annual Charges 5/8" / 3/4" $43.31 1.0 5,859 5,859.0 1,015,072$ 1" $129.29 3.0 147 441.0 76,021$ 1 1/2" $258.56 6.0 136 816.0 140,658$ 2" $430.50 10.0 40 400.0 68,880$ 3" $989.63 23.0 12 276.0 47,502$ 4" $1,764.00 41.0 4 164.0 28,224$ 6" $3,958.50 92.0 1 92.0 15,834$ Totals 6,199.0 8,048.0 1,392,191$ Revenue Excess/(Shortfall) 318,518$ Increase in Base Rate Needed (%) -22.88% Increase in total equivalent meters needed (1,838) Increase in volume charges to meet total revenue target -14.43% Average Residential Bill (48,000 gallons per year) Base Charge 43.31$ Volume Charge 81.00$ Total 124.31$ 39.29% Required Revenue from Volume Charges = Required Operating Revenue from metered sales = 2027 Estimate: Option F - Next Community Estimated Revenue from Volume Charges = Projected Non-operating (Other) Income Estimated Revenue from Base Charges Revenue Excess (Shortfall) from metered sales = % Change from '26 Weston Sewer Utility 11/04/26 2027 Financial Projections Projected Total Expenses for 2027 3,925,000$ 325,000$ 3,600,000$ 1,308,659$ 2,291,341$ 2,451,473$ (Based on 2025 flow) Units Billed in (1000's of gallons) = 374,270.6 @ $6.55 160,132.0 Excess Estimated 2027 Base Charge Revenues with $2.00/1000 Increase Base charges increased ±17.5% Customer count as of 12/31/25 Meter Size Rate/Qtr. Base Charge Ratio (multiple of 5/8") Number of Meters Equivalent Meters Total Annual Charges 5/8" / 3/4" $40.71 1.0 5,859 5,859.0 954,167 $ 1" $121.53 3.0 147 441.0 71,460$ 1 1/2" $243.05 6.0 136 816.0 132,219$ 2" $404.67 10.0 40 400.0 64,747$ 3" $930.25 23.0 12 276.0 44,652$ 4" $1,658.16 41.0 4 164.0 26,531$ 6" $3,720.99 92.0 1 92.0 14,884$ Totals 6,199.0 8,048.0 1,308,659$ Revenue Excess/(Shortfall) 160,132$ Increase in Base Rate Needed (%) -12.24% Increase in total equivalent meters needed (983) Increase in volume charges to meet total revenue target -6.99% Average Residential Bill (48,000 gallons per year) Base Charge 40.71$ Volume Charge 78.60$ Total 119.31$ 33.68% Revenue Excess (Shortfall) from metered sales = % Change from '26 2027 Estimate: Option G - Avg of Break Even and Next Community Projected Non-operating (Other) Income Required Operating Revenue from metered sales = Estimated Revenue from Base Charges Required Revenue from Volume Charges = Estimated Revenue from Volume Charges = Weston Sewer Utility 11/04/26 2027 Financial Projections Projected Total Expenses for 2027 3,925,000$ 325,000$ 3,600,000$ 1,295,294$ 2,304,706$ 2,417,788$ (Based on 2025 flow) Units Billed in (1000's of gallons) = 374,270.6 @ $6.46 113,082.6 Excess Estimated 2027 Base Charge Revenues with $1.91/1000 Increase Base charges increased ±16.3% Customer count as of 12/31/25 Meter Size Rate/Qtr. Base Charge Ratio (multiple of 5/8") Number of Meters Equivalent Meters Total Annual Charges 5/8" / 3/4" $40.30 1.0 5,859 5,859.0 944,423 $ 1" $120.29 3.0 147 441.0 70,730 $ 1 1/2" $240.57 6.0 136 816.0 130,868$ 2" $400.54 10.0 40 400.0 64,086 $ 3" $920.75 23.0 12 276.0 44,196 $ 4" $1,641.23 41.0 4 164.0 26,260 $ 6" $3,682.99 92.0 1 92.0 14,732$ Totals 6,199.0 8,048.0 1,295,294$ Revenue Excess/(Shortfall) 113,083$ Increase in Base Rate Needed (%) -8.73% Increase in total equivalent meters needed (702) Increase in volume charges to meet total revenue target -4.91% Average Residential Bill (48,000 gallons per year) Base Charge 40.30$ Volume Charge 77.52$ Total 117.82$ 32.01% Estimated Revenue from Volume Charges = Revenue Excess (Shortfall) from metered sales = % Change from '26 2027 Estimate: Option H - Avg of Break Even, Avgs. and Next Community Projected Non-operating (Other) Income Required Operating Revenue from metered sales = Estimated Revenue from Base Charges Required Revenue from Volume Charges = REQUEST FOR CONSIDERATION REQUEST FOR CONSIDERATION PAGES 1 OF 2 Public Mtg/Date: Public Works Committee – 11/9/2026 Description: Sidewalk Snow Removal Policy From: Michael Wodalski, PE - Director of Public Works Question: Does the Public Works Committee see a need to make changes to the current sidewalk snow removal policy? Background The Village of Weston adopted the attached Snow and Ice Control Policy in 2014 and have been utilizing those guidelines since then to dictate the Village’s Snow and Ice Response. It’s a small section, but within the policy it mentions which sidewalks and multi-use paths the Village will maintain. In reviewing the document, there are areas that we need to add as new multi-use paths have been added and as a general guideline, the Village does remove snow from multi-use paths. The sidewalks listed within the policy include: - Schofield Ave from Ryan St to BUS 51 - BUS 51 from Jelinek Ave to Schofield Ave - Camp Phillips/CR-X from Howland Ave to Northwestern Ave The above are streets along arterial roadways with multiple lanes of travel and narrow boulevards. Due to that, there is more snow accumulation along those sidewalks and the Village has historically committed to removing snow along those major routes. Additionally, sidewalk adjacent to Village owned land such as Kennedy Park and the Public Safety Building are noted as the Village is the adjacent property owner. There are also two areas in the Village where there is no boulevard which is on Birch St near Sternberg Ave and then on Mesker St from Schofield Ave to Lee St. In those two cases, the Village will also clear snow as the sidewalk is the entire windrow of snow off of the plow. I have the map of the sidewalks and paths cleared by the Village attached as well. Our Municipal Ordinance (Sec. 70.112 Cleaning of Sidewalks) is attached and specifies, “The owner of property or party in possession of the property abutting on any sidewalk shall, without notice and at all times, keep such abutting sidewalk clean and free from debris, dirt, sweepings, obstructions and clear of snow and ice … “ As we have begun to install sidewalks within reconstructed roads, snow removal on sidewalks comes up as a question. Attached is a letter from a homeowner whose side yard is Fuller St and had sidewalk installed in 2025. I have held the position with the resident that the resident is responsible for removal of snow on their sidewalk. REQUEST FOR CONSIDERATION REQUEST FOR CONSIDERATION PAGES 2 OF 2 In reviewing the policy, I believe it still meets the intent of the Village’s capabilities for snow and ice removal, but we should look at updating the information as there have been some changes over the past 12 years as far as where exactly the routes go and the addition of more multi-use paths. If there are any other changes the Committee would like to see please let me know. Attached Docs: - Snow and Ice Policy from 2014 - Map of sidewalks and paths currently plowed by the Village - Email from resident along Fuller St regarding Village removing snow from the sidewalk ______________________________________________________________________ Committee Action: - Topic has been discussed previously Fiscal Impact: - TBD, if the Village is to take on more sidewalks that would equate to more staff time and possibly more equipment _______________ ___________________________________________________________ Recommendation: - Staff recommends updating the policy to reflect current roads and routes. Then is seeking any additional feedback the committee may have. Recommended Language for Official Action I move to ______________________________ ____________________________________________________________________ Additional action: Sec 70.112 Cleaning Of Sidewalks The owner of property or the party in possession of the property abutting on any sidewalk shall, without notice and at all times, keep such abutting sidewalk clean and free from debris, dirt, sweepings, obstructions and clear of snow and ice and shall not deposit or place any sweepings or debris or other foreign matter upon the sidewalk, or in the street. Snow and ice shall be removed within 48 hours. If any owner shall fail or neglect to keep any sidewalk free of debris, dirt, sweepings, obstructions, snow or ice, the Village may proceed to clear such sidewalk and shall charge the expense, as defined by the Village Board in the village schedule of fees, thereof as a special tax against the premises to be collected as other taxes on real estate. The Village may, but shall not be required to, give notice to the owners of the property before providing for the Village to clear such walks. (Code 1982, § 8.05, Ord. of 5-24-2007) HISTORY Amended by Ord. Chapter 79 Cleaning of Sidewalks Sec 70.112 on 5/24/2007 Amended by Ord. 15-027 on 11/18/2015 From: jjjhrj111@aol.com To: Michael Wodalski Subject: Snow Plowing by Village of Weston Date: Tuesday, October 6, 2026 3:24:29 PM Hi Michael & Board of Trustees, my Husband & I are requesting that the Village plows the snow from Ross Avenue to High Ridge Circle on the West side of our home. I have had a number of discussions with Michael on the matter, however was told he needed to present to the Board. John & I live at 5700 High Ridge Circle & have been residents in the Village for 30 plus years. In addition, I ran a business in Weston for over 34 years, We have no sidewalk in the front of our home currently. Michael tells us we are required to plow the sidewalk. We never had a side walk for over 30 years on Fuller. I plowed this past Winter, as my Husband John has been disabled for over 40 plus years. This is not a safe situation, nor happy about it. Our road High Ridge Circle in one of the last roads to be plowed. Ross & Fuller is plowed early morning. I try to get the sidewalk cleared early morning , before packed down from people walking. To accomplish this, my choices are if not plowed go onto the black top road on High Ridge & plow down to Fuller. If High Ridge plowed, pull blower backwards down High Ridge to Fuller as can't run blower due to gravel. . This intersection has a stop sign on High Ridge where all the traffic from subdivision comes through. If our home faced Fuller , I could understand it would be our responsibility, Our home & the Anderson's are the only ones that do not face Fuller, everyone else does. I would like to know why the Village plows the sidewalk on Mesker Street? I have saw them plow numerous times Mesker Street that intersects with Lee Avenue. This is the exact situation as we have, duplex faces Lee Avenue. Why are the owner's & business's not responsible? My business was located on Schofield Avenue & this was also plowed by the Village , We are hoping you would review this matter & consider plowing this section of sidewalk. The Village plows all along Ross Avenue behind our subdivision BUT stops at Fuller Street. Looking forward to hearing back from you on this situation, Sincerely, Holly & John Jorgensen Lizzard Sidewalk Snow Removal Map Date: Adoption Date (Village): N/A Map by the Village of Weston Public Works, Utilities, & Technology Services Department 12/13/2022 Village of Weston Marathon County, Wisconsin ä ä JARP ST BROOK CT X ALAN LN ¬«29 MERIDIAN AV SANDY LN £¤51 £¤51 FULLER ST ¬«29 BARCLAY WAY X CAM P PHILLIPS RD RIVER BEND RD SCHOFIELD AV SCHOFIELD AV WESTON AV COMMUNITY CENTER DR BIRCH ST ROSS AV M ESKER ST ALDERSON ST VOLKM AN ST µ 0 0.5 10.25 Miles Legend ä Lift Station Needing Lizard Lizard (Sidewalk Removal) Road Centerlines Village OF WESTON SNOW AND ICE CONTROL POLICY Keith Donner, P.E. Michael Wodalski, P.E. Director of Public Works Deputy Director of Public Works March 3, 2014 Revised: Revised: INTRODUCTION Due to its geographic location, the Village of Weston is subject to freezing rain, ice and snow anytime during the fall, winter, and spring months; a.k.a. winter precipitation events. Normally, winter storms can be expected during the months of November thru April. The Village of Weston's Public Works Department is responsible for keeping vehicular and pedestrian traffic moving safely on the Village of Weston’s approximately 260 lane miles of streets, as well as the approximate 30 lane miles of streets in the Town of Weston which the Village is currently contracted to maintain. The purpose of this policy is to articulate the procedures and policies for the maintenance of public areas in response to winter precipitation events which create snow and ice related conditions in the Village of Weston. This policy replaces all prior written or unwritten policies regarding winter precipitation response and/or snow and ice control. This policy does not affect or override existing ordinances or laws pertaining to sidewalks, parking, or other public areas. The reference to winter precipitation events is meant to interchangeably apply to snow and ice control as it is used in this policy or elsewhere in related documents. The intent of establishing a snow and ice control policy is to provide a uniform understanding of the priorities and procedures used to respond to winter precipitation events which create snow and ice related conditions. Each winter precipitation event presents unique challenges and since there is always the potential for unforeseen circumstances, such as equipment breakdowns and infinitely variable environmental conditions, the time required to reach completion for each winter precipitation event will also vary. It is not possible, nor is it the intent, for this policy to prescribe, in advance, time constraints within which a level of completeness is to be achieved by the Department in response to any particular winter precipitation event or the resulting snow and ice conditions. WINTER PRECIPITATION/SNOW AND ICE CONTROL RESPONSIBILITY The Village of Weston Public Works Department is responsible for approximately 290 lane miles of streets in the Village and Town of Weston plus other public areas during winter precipitation events. The Department has divided the Village into six areas or six plowing routes for assigning response resources. Each of the six areas contains a mixture of highest priority (priority A Routes) plowing and sanding/salting routes and other lower priority Village streets. Marathon County is responsible for the maintenance of the main travel lanes of CTH X/Camp Phillips Road, CTH J, CTH N, and Business Highway 51 within the corporate limits of the Village and Town of Weston. EVENT RESPONSE STRATEGY The allocation of resources and tactics employed by the Department in responding to a winter precipitation event and the overall time taken to respond to an event is dependent on many factors that vary for each event. As with any response to an event involving unpredictable conditions there is judgment applied to the allocation of resources. However, the prioritization for responding to a winter precipitation event is further described in this policy. Planning and preparing for each snow and ice control project is made difficult by the uniqueness of each storm. No two storms are ever identical. Factors such as rate of snowfall, moisture content, accumulation, temperature, time of day and wind velocity determine the uniqueness of each storm. The Village’s snow and ice control program must be definite enough in nature to establish systematic procedures for responding to any snow and ice control event, while being flexible enough to accommodate the unique aspects of each storm. Many factors affect the impact of a storm on the community. During most storms the greater the snow accumulation the greater the problems, particularly in areas where snow must eventually be hauled away. A storm during high traffic times is more difficult to clear than the same storm during a weekend. High winds will cause streets to fill up quickly again with drifted snow requiring additional effort on the part of the Public Works Department. The temperature at the time of a storm will also affect conditions. Snow falling on warm pavement will disappear with little effort. But, a moderate storm, along with a prolonged sub- freezing period, will greatly increase the required removal effort. Also, light, dry snows handle more easily than heavy, wet snows. Receiving and analyzing weather information is probably the most critical link for a successful snow and ice control program. Making a decision at the correct time is vital to the success or failure of the total operation. At the present time, the Public Works Department depends on television forecasts and internet weather service to help with storm control decisions. Determination of the Need for Response The Street Operations Crew Leader assigned to the on-call responsibility is designated by the Director of Public Works as the first responder for a winter precipitation event. This first responder is given the authority to determine the proper allocation of resources to a snow and ice control event. The Village President or Village Administrator may also direct the Public Works Department to commence winter maintenance operations. Allocation of resources decisions will involve judgment as to whether to respond, when to respond, and what level of effort is needed. Dependent on the conditions resulting from a winter precipitation event, the response of the Public Works Department varies. Not every winter precipitation event presents the same conditions, or requires identical response. Generally some type of response will be necessary if streets become snow covered and/or slippery. To assist in making the judgments as to strategy to use in a particular event, the first responder should rely on current weather conditions, weather forecasts, and reports from local law enforcement patrol officers. Factors to be considered include type and amount of precipitation (current and forecast), air temperature (current and forecast), pavement temperature, humidity, wind, and time of day. Determination of Resource Allocation The intensity of response required for snow and ice control is dependent on the amount of precipitation which occurs. To help the public better understand how resources are allocated streets are given prioritization, or hierarchy, for clearance, and precipitation events are categorized. Prioritization of Response Guidelines for prioritizing the allocation of resources have been established in advance of event response. Not every street is viewed or treated the same way. Plow routes include a mixture and balance of streets with different levels of priority for clearance. Plow routes also may vary in size dependent on available resources. Priority A - streets are Village and Town thoroughfare streets which are those streets in the urbanized area classified system and other local streets of significance due to their role in providing access to St. Clare’s Hospital, schools, and commercial districts. Included are all or parts of the following streets: Village of Weston: Alderson St Alta Verde St Barbican Ave Bayberry St Birch St Callon Ave Commerce Dr Community Center Dr Concord Ave Corozalla Ave Cranberry Blvd Eau Claire Ave Enterprise Way Foothill Ave Fox St Fuller St Franciscan Way Highland Ave Heeren St. Howland Ave Isaiah St Janice Ave Jelinek St Machmueller St McIntyre St Mesker St Ministry Pkwy Neupert Ave Normandy St Old Costa Rd Progress Way Quentin St River Bend Rd Ross Ave Ryan St. Sandy Ln Schofield Ave Shorey Ave Sternberg Ave Stone Ridge Dr Teagan Ln Volkman St Von Kanel St Weston Ave Westview Blvd Woodland Dr Town of Weston: Gusman Rd Hawthorne Ln River Rd Ross Ave Kramer Ln Kersten Rd Lester St Priority B – streets are the remaining Village and Town streets which are lesser-traveled collector and residential streets. Priority C - streets and public spaces include cul-de-sacs, public sidewalks, parking lots, wells, sewage pumping stations, and parks maintained by the Department of Public Works. These streets are normally treated only after priority one and two streets are satisfactorily completed or have sufficient resources available and/or assigned to address. The prioritization of streets been determined in such a manner that most residences are no more than four blocks from a Priority A street. Event Categorization Level 1 – is the occurrence of a snowfall of up to 1 ¼ inches. For a Level 1 event only Priority A streets will be cleared or otherwise treated. Level 2 – is the occurrence of a snowfall of between 1 ¼ to 3 inches. For a Level 2 event, Priority A and Priority B streets will be cleared or otherwise treated during unscheduled time. Priority C areas will only be cleared or otherwise treated during normally scheduled work periods and after precipitation has ceased. Level 3 – is the occurrence of a snowfall of greater than 3 inches in depth. For a Level 3 event, clearance or other treatment is required regardless of the timing of the event. Response levels may vary depending on whether the snowfall is combined with freezing and icing conditions which would make the public ways difficult to travel. Precipitation other than accumulating snow, such as freezing rain, will require the exercise of judgment as to the necessary treatment(s) to apply, if any, such as salt, sand, etc. EMERGENCY SERVICES CONSIDERATIONS During snow and ice conditions, emergency calls from the Police and Fire Departments regarding accidents, medical or other emergency situations are given top priority for whatever assets are needed to support their emergency response efforts. Public Works Department personnel do not respond to unverified "emergency" requests direct from the public. Public Works employees will not pull or tow stranded motorists, but will notify the proper authorities that can be of assistance. OTHER CONSIDERATIONS Any complaints regarding snow and ice control measures shall be forwarded to the Public Works Department during normal work hours of 7:30 a.m. to 5:00p.m. on weekdays. Phone number: (715) 359-6114. A map showing priority routes is available at the office of the Director of Public Works located in the Municipal Center. The Village will not salt, sand or plow private property and cannot shovel out ridges in driveways caused by the snowplows. Snow removal from driveways and sidewalks is the property owners' responsibility. MAILBOXES Operators are instructed to be cautious around mailboxes. In most cases a properly installed mailbox will permit a snowplow to clear the snow underneath it. Most cases of damaged mailboxes are caused by heavy snow hitting the box. Payment for the replacement of mailboxes by the Village of Weston shall be limited to a $25.00 payment. Payment shall be made upon confirmation by the Public Works Director or his designee that the mailbox was actually hit or damaged by a snow plow and upon receipt of an invoice from the property owner as proof that a replacement mailbox was purchased. The Village of Weston will not supply mailboxes or posts. Owners are responsible for installation of replacement mailboxes. Village employees will not replace mailboxes. PERSONNEL AVAILABLE FOR WINTER MAINTENANCE OPERATIONS All full time employees of the Street, Parks and Utilities Departments are expected to be available from November 1st to April 1st to assist in snow and ice removal operations, subject to departmental policies on paid time off. Employees who know that they will be unable to respond to a snow emergency shall make the Director of Public Works, or the street operations first responder aware of the situation so that any necessary modifications in resource acquisition and allocation can be anticipated. OVERTIME POLICY The determination of when to use overtime in the removal of snow or ice shall be made by one of the following: Director of Public Works or Street Dept. Supervisor Village Administrator Village President The need for overtime will be dependent on the severity of a storm. Maintenance of most Priority C areas shall not require overtime, or unscheduled work. The following degree of maintenance may require overtime: Priority A: Streets should be kept passable at all times if possible. Priority B: Streets should be open to travel by plowing, salting or sanding within 12 hours after a storm. In the following sections the time allotted for removal of a storm shall include Saturdays, Sundays or holidays which may require overtime. EQUIPMENT AVAILABLE FOR WINTER MAINTENANCE OPERATIONS 6 - Trucks with plows, wings and spreaders. 2 - End loaders (with a plow option) 1 - Motor Grader 4 - One-Ton trucks w/plows 1 – Pickup truck with a plow 1 – Multi-purpose tractor with snow blower attachment. PLOWING Plowing consists of moving snow to either side of a street or public area after which it may be loaded and trucked to a remote area. Plowing should be accomplished according to designated routes and priorities. Clearance Goals Priority A Streets: Two lanes of traffic open within 4 hours of response start and thereafter. Priority B Streets: Two lanes of traffic open within 12 hours after a storm ends and thereafter. Priority C Streets: Open to travel within 24 hours after a storm ends and thereafter. In severe weather conditions where there is danger to operators or it is not practical or cost effective to Continue plowing; snow and ice control operations may be suspended. PRIVATE PLOWING No snow or ice removed from private property shall be deposited in any public way or areas expected to be cleared by personnel from the Village of Weston. This would include any of the following, which are prohibited:  Pushing snow or ice across a street or walk.  Depositing snow or ice on a public way, where expected to be maintained for pedestrian or vehicular traffic.  The blowing of snow or ice onto vehicle or pedestrian travel areas. Any of the above are dangerous and could cause injury or accidents. Violation of any of the above may result in a forfeiture action against the property owner, resulting in a fine. Removal may also be made by the Village, through notification of the property owner, with a penalty plus actual removal costs being assessed against the property. SALTING Salting shall provide placement of sodium chloride upon a snow or ice surface to remove accumulation when temperatures are below freezing. Salt shall be used only when absolutely necessary as determined by the Director of Public Works or his designee in areas of high volume traffic or dangerous conditions (most salt is applied at hills, curves and intersections). Salt may have adverse side effects on the environment and shall be used with this in mind. Salt is not effective below a certain temperature (20°F) adjusted by the amount of available sunlight. With favorable temperatures, salt can be used to melt up to 2" of snow and will prevent the bonding of compacted snow to pavements resulting in cleaner plowing jobs. Due to the expense the Village will not apply salt to lesser traveled collector and residential streets, unless severe icing requires its use. SALT AND SAND MIXTURE Sanding is done to provide a traction surface on packed snow or ice and shall be applied only in areas of high traffic movement or unsafe areas as determined by the Director of Public Works or his designee. Since the salt/sand mixture contains only 5-15% salt, to keep the sand from freezing, sanding is not done to try and melt snow or ice. Sanding of streets can cause a buildup of sand in storm sewers and points of discharge, which could require additional maintenance or environmental concerns. Therefore sand shall only be used as absolutely needed. Sand and salt mixture is available to Village residents at the Village garage. SNOW REMOVAL The existing snow disposal operations include the use of a front-end loader or a snow blower to load snow into dump trucks. Snow is hauled to various sites throughout the Village. Snow is removed from areas as needed and as time allows throughout the winter. Snow is removed in order to create room for future snow storage throughout the winter and in the spring time snow removal helps reduce the amount of snow melt and associated flooding experienced in a specific area. PARKING: For the purpose of this section parking is defined to mean permitting a vehicle to remain unattended, but shall not include the temporary stopping of a vehicle by a doctor on an emergency call, police, fire or other emergency vehicles, or business vehicles being used for normal delivery or pickups. WINTER PARKING REGULATIONS: Sec. 82.107 (a) Village of Weston, Code of Ordinances. When signs have been erected at or reasonably near the village limits as provided in Wis. Stats. § 349.13, no person shall park any vehicle for a period of time longer than 30 minutes between the hours of 2:00 a.m. and 6:00 a.m. of any day, from October 31 to May 1, except physicians or surgeons, when parking is reasonably necessary on emergency calls. SNOW EMERGENCY A snow emergency shall exist whenever there shall be an accumulation of four (4) or more inches of snow during a twenty-four (24) hour period and such accumulation interferes with the safe and efficient movement of traffic or impairs the ability of emergency vehicles to travel safely over the streets of the Village of Weston. Such emergency shall continue in effect for 24 hours after snow has ceased to fall, or until such time as the snow has been removed from the streets or highways within the Village, or until the Director of Public Works or his designee rescind the snow emergency. DECLARATION OF SNOW EMERGENCY: Sec. 82.107 (C)(1) Village of Weston, Code of Ordinances. A snow emergency may be declared to exist by the Director of Public Works or his designee, or by the Chief of Police by giving notice to the news media. A declaration shall be a service aid only and not a duty on the part of said officials. SNOW EMERGENCY PARKING REGULATIONS: Sec. 82.107 (C) Village of Weston, Code of Ordinances. After notice is given, during the period of such snow removal emergency as so declared, no vehicle shall be parked, stopped or left standing on any public street or alley within the village. Approved by the Weston Village Board on: Month Date, 2014 SNOW PLOWING PRIORITY ROUTES Subject to mechanical condition of equipment, snow plowing of Priority A streets are currently assigned as follows: ROUTE 9 TRUCK #9 Jelinek Ave from BUS 51 to Birch St Normandy St from Schofield Ave to Jelinek Ave Volkman St from STH 29 to Priebe St Alderson St from STH 29 to Schofield Ave Birch St from Community Center Dr to Schofield Ave Community Center Drive from Birch to CTH X Barbican Ave from CTH X to Von Kanel St Neupert Ave from BUS 51 to Alderson St ROUTE 10 TRUCK #10 Ross Ave from Metro Center Dr to Kramer Rd Kramer Rd from Ross to Kersten Kersten from Kramer to CTH N Northwestern Ave from CTH X to City of Wausau Alderson St from Ross Ave to Mallard Ct Eau Claire Ave from Alderson to CTH X Bayberry from Ross to Concord Concord Ave from Bayberry to CTH X ROUTE 17 TRUCK #17 Schofield Ave (Entire length with trucks 29 & 69) Sternberg Ave from Birch to Mesker St Mesker St from Ross to Schofield Ave Janice from Mesker to Fuller Fuller from Ross to Schofield Ave Corozalla from Ross to Mesker Fox St from Norma to Schofield Ave ROUTE 29 TRUCK #29 Schofield Ave (Entire length with trucks 17 & 69) Weston Ave from CTH X to Ringle Line Shorey Ave from CTH X to Ryan St Ryan St from Shorey Ave to Schofield Ave Howland Ave from CTH X to Woodland Dr Woodland Dr. from Howland Ave to Shorey Ave Heeren St from Nick to Weston Ave??? Progress Way Commerce Drive Enterprise Way Zinser St from Schofield Ave to STH 29 ROUTE 60 TRUCK #60 Alderson St from Shorey Ave to Howland Ave Weston Ave from Birch St to CTH X Hospital Area between STH 29 and Weston Ave(Ministry Pky, Cranberry Blvd, Stone Ridge Dr., Westview Blvd, Franciscan Way, Birch St) East Jelinek from CTH X to Municipal St Mesker St from Schofield Ave to E Jelinek Von Kanel from Barbican to E Jelinek ROUTE 69 TRUCK #69 Schofield Ave (Entire length with trucks 17 & 29) Sandy Ln from Ross Ave to Canoe St Canoe St from Sandy Lane to Termini Isaiah St from Sandy Ln to Walleye Dr. Walleye from Isiah to Creel Creel from Walleye to Quentin Quentin from Portage to Kramer Portage from Canoe to Quentin Michael Dr from Alex to Cheryl ASSIGNED PLOWING ROUTES ROUTE 1 TRUCK #9 All streets: East of Volkman St., North of STH 29, South of Schofield Ave and West of Birch St. Community Center Dr. and Barbican Ave are also part of the route. ROUTE 2 TRUCK #10 All streets including Ross Avenue North of Ross Avenue and West of the Eau Claire River, all streets off of Northwestern Avenue, and all roads in the Town of Weston North of Gusman Rd. All streets within the Powers Subdivision are part of this route as well. ROUTE 3 TRUCK #17 All streets located between Ross Ave and Schofield Ave from the Western Village Border to and including streets from Fuller St to the Eau Claire River. ROUTE 4 TRUCK #29 All streets south of STH 29 and East of Camp Phillips Road/CTH X. As well as all streets South of Schofield Ave and East of Municipal Street. ROUTE 5 TRUCK #60 All streets South of STH 29 and West of Camp Phillips Road/CTH X. As well as all streets between Schofield Ave and STH 29 from Birch St to Municipal St, excluding Community Center Dr. and Barbican Ave. ROUTE 6 TRUCK #69 All Village Streets located North of the Eau Claire River except for the Powers Subdivision, and all Town Roads south of Gusman Rd. Additionally all Village Streets East of Fuller St. and North of Schofield Ave. Drivers will not deviate from their assigned routes until that route is completed or ordered to do otherwise by the Director of Public Works, Street Superintendent or the Village Administrator. Upon completion of their assigned routes drivers will check in with the Director of Public Works or the Street Superintendent for assignment to help in another area. No driver is excused from duty until the DPW or Street Superintendent is notified and all streets are cleared. VILLAGE MAINTAINED SIDEWALKS and MULTI-USE PATHS  Schofield Ave: Ryan St to BUS 51  BUS 51: Jelinek Ave to Schofield Ave.  Camp Phillips/CTH X: Howland Ave to Northwestern Ave  Birch St: Weston Ave to Community Center Dr.  Weston Ave: Camp Phillips/CTH X to Birch St.  Kennedy Park: (Bounded by Alderson St, Neupert Ave, Alta Verde St, and Jelinek Ave)  Public Safety Building: (Mesker St) REQUEST FOR CONSIDERATION REQUEST FOR CONSIDERATION PAGES 1 OF 2 Public Mtg/Date: Public Works Committee – 11/9/2026 Description: CR-X and Sternberg Ave Intersection Engineering Design Services From: Michael Wodalski, Director of Public Works Question: Does the Public Works Committee Recommend the Village Board approve an Engineering Design Contract with SEH for the CR-X and Sternberg Ave intersection in an amount of $43,500? Background The Village has partnered with the Marathon County Highway Department to reconstruct CR-X and the Ross Ave intersection from Sternberg Ave to north of Concord Ave. The project limits at Sternberg Ave were just north of the Sternberg intersection and the main part of the project is the Ross Ave and CR-X intersection improvements. This project currently has an STP-Urban grant through the Wisconsin Department of Transportation (WDOT) in the amount of $2,352,000. The Village then submitted a Transportation Alternatives Project (TAP) grant to the WDOT for improvements to the Sternberg Ave and CR-X intersection as part of the Weston Elementary School Safe Routes to School Plan. The Village was informed in September 2026 that we did not receive the TAP grant funding for this project. Weston can still proceed with the intersection improvements as part of the CR-X project, just all associated costs will be the Village’s. The purpose of the intersection improvements at Sternberg Ave is to improve access to the school and crossing of CR-X at this location. The design would create a refuge island on the roadway and also provide warning lights. The design proposal is from SEH who is the design engineer currently hired for the CR-X and Ross Ave project. SEH would continue the design south of Sternberg to tie into the new roadway project. There is some additional cost on the front end to have this design included with the current WisDOT funded project, however, there should be substantial construction savings by having this project included right away. If this intersection improvement is not included as part of the upcoming project in 2028, it would like wait until the section of CR-X is reconstructed between Schofield Ave and Sternberg Ave which currently does not have a timeline. This intersection improvement has been identified in the following plans: - Village of Weston Comprehensive Plan - Weston Elementary School Safe Routes to School Plan - Village of Weston Bicycle and Pedestrian Plan - Wausau MPO Bike and Pedestrian Plan Attached Docs: - Proposal from SEH - Safe Routes to School Plan REQUEST FOR CONSIDERATION REQUEST FOR CONSIDERATION PAGES 2 OF 2 Committee Action: - Committee previously approved the ongoing efforts for the CR-X and Ross Ave Project Fiscal Impact: - Design is $43,500, construction cost is likely around $200,000 _______________ ___________________________________________________________ Recommendation: Staff recommends awarding the contract to SEH to incorporate the Sternberg Ave intersection improvements into the CR-X and Ross Ave Project slated for construction in 2028 Recommended Language for Official Action I Move to recommend ___________________. Or, Something else ____________________________________________________________________ Additional action: Short Elliott Hendrickson Inc. Letter Agreement - 1 Village of Weston Affirmative Action, Equal Opportunity Employer (Rev. 05.29.25) Agreement for Professional Services This Agreement is effective as of November 1, 2026, between Village of Weston (Client) and Short Elliott Hendrickson Inc. (Consultant). This Agreement authorizes and describes the scope, schedule, and payment conditions for Consultant’s work on the Project described as: CTH X and Sternberg Ave Client’s Authorized Representative: Michael Wodalski Address: 4747 Camp Phillips Rd, Weston, Wisconsin 54476, United States Telephone: 715-359-6114 Email: mwodalski@westonwi.gov Project Manager: Brett Hollister Address: 10 North Bridge Street, Chippewa Falls, Wisconsin 54729 Telephone: 715.720.6253 Email: bhollister@sehinc.com Scope: The Basic Services to be provided by Consultant as set forth herein are provided subject to the attached General Conditions of the Agreement for Professional Services (General Conditions Rev. 01.01.26), which is incorporated by reference herein and subject to Exhibits attached to this Agreement. Consultant will update the roadway design and supporting documentation to extend the project limits south of the CTH X/Sternberg Ave intersection and reconfigure the intersection to incorporate pedestrian accommodations identified in the safe routes to school evaluation. Services include report updates, environmental documentation, agency coordination, survey, plat preparation, roadway and drainage design, and RRFB plans described below. Attached exhibit depicts proposed work. 1) Reports a. Design Study Report (DSR): Update design details to reflect the extended project limits and intersection reconfiguration. b. Stormwater Drainage Water Quality Report: Update design details to reflect the extended project limits and intersection reconfiguration. 2) Environmental Documentation a. Categorical Exclusion Checklist i. Update the environmental document to capture the extended project limits and intersection reconfiguration. b. Hazardous Materials i. Update hazardous materials documentation to address the extended project limits and intersection reconfiguration. c. Section 106 Documentation i. Update the screening (DT1030 form) and full evaluation (DT 1635 form) to address the extended project limits and intersection reconfiguration, and submit both to the WisDOT Cultural Resources Team for approval. 3) Agency Coordination a. Update outside-agency screening tools to address the extended project limits and intersection reconfiguration. 4) Survey a. Perform topographic survey within the extended project limits and intersection reconfiguration area. Short Elliott Hendrickson Inc. Letter Agreement - 2 Village of Weston (Rev. 05.29.25) 5) Plat a. Prepare one additional Transportation Project Plat (TPP) sheet for parcels affected by the extended project limits and intersection reconfiguration. b. Order title reports and necessary title updates to support preparation of the TPP. 6) Design a. Revise the roadway design for the extended project limits and reconfigure the CTH X/Sternberg Ave intersection to accommodate a uniform widened median, shifted equally to west and east. b. Design a raised pedestrian refuge island on the north leg of the intersection. c. Design four additional curb ramps. d. Evaluate and revise detour concepts to reflect the extended project limits and intersection reconfiguration. e. Design storm sewer modifications at the intersection, including relocation of four inlets and associated storm sewer pipe. 7) Rectangular Rapid Flashing Beacon (RRFB) a. Design and prepare plan sheets for one wired RRFB located along the north leg of CTH X . Schedule: 1) The schedule of this project will follow and is tied to the WisDOT project 6659-02-01. Payment: The lump sum fee is $43,500.00 including expenses and equipment. The payment method, basis, frequency and other special conditions are set forth in attached Exhibit A-2. This Agreement for Professional Services, attached General Conditions, Exhibits and any Attachments (collectively referred to as the “Agreement”) supersedes all prior contemporaneous oral or written agreements and represents the entire understanding between Client and Consultant with respect to the services to be provided by Consultant hereunder. In the event of a conflict between the documents, this document and the attached General Conditions shall take precedence over all other Exhibits unless noted below under “Other Terms and Conditions” . The Agreement for Professional Services and the General Conditions (including scope, schedule, fee and signatures) shall take precedence over attached Exhibits. This Agreement may not be amended except by written agreement signed by the authorized representatives of each party. Other Terms and Conditions: Other or additional terms contrary to the General Conditions that apply solely to this project as specifically agreed to by signature of the Parties and set forth herein: None. Short Elliott Hendrickson Inc. Village of Weston By: [[DocuSignSignature_1]] By: [[DocuSignSignature_2]] Full Name: [[DocuSignFullName_1]] Full Name: [[DocuSignFullName_2]] Title: [[DocuSignText_Signer1_Text1]] Title: [[DocuSignText_Signer2_Text1]] Short Elliott Hendrickson Inc. Letter Agreement - 3 Village of Weston (Rev. 05.29.25) Exhibit A-2 Payments to Consultant for Services and Expenses Using the Lump Sum Basis Option The Agreement for Professional Services is amended and supplemented to include the following agreement of the parties: A. Lump Sum Basis Option The Client and Consultant select the Lump Sum Basis for Payment for services provided by Consultant. During the course of providing its services, Consultant shall be paid monthly based on Consultant’s estimate of the percentage of the work completed. Necessary expenses and equipment are provided as a part of Consultant’s services and are included in the initial Lump Sum amount for the agreed upon Scope of Work. Total payments to Consultant for work covered by the Lump Sum Agreement shall not exceed the Lump Sum amount without written authorization from the Client. The Lump Sum amount includes compensation for Consultant’s services and the services of Consultant’s Consultants, if any for the agreed upon Scope of Work. Appropriate amounts have been incorporated in the initial Lump Sum to account for labor, overhead, profit, expenses and equipment charges. The Client agrees to pay for other additional services, equipment, and expenses that may become necessary by amendment to complete Consultant’s services at their normal charge out rates as published by Consultant or as available commercially. B. Expenses Not Included in the Lump Sum The following items involve expenditures made by Consultant employees or professional consultants on behalf of the Client and shall be paid for as described in this Agreement 1. Expense of overtime work requiring higher than regular rates, if authorized in advance by the Client. 2. Other special expenses required in connection with the Project. 3. The cost of special consultants or technical services as required. The cost of subconsultant services shall include actual expenditure plus 10% markup for the cost of administration and insurance. The Client shall pay Consultant monthly for expenses not included in the Lump Sum amount. Short Elliott Hendrickson Inc. Letter Agreement - 4 Village of Weston (Rev. 05.29.25) Short Elliott Hendrickson Inc. Letter Agreement - 5 Village of Weston (Rev. 05.29.25) COUNTY X (CAMP PHILLIPS RD) STERNBERG AV STERNBERG AV COUNTY X (CAMP PHILLIPS RD) WISDOT/CADDS SHEET 42EHWY:COUNTY:X:\KO\M\MARAC\176840\4-PRELIM-DSGN-RPTS\C3D\00000000\DSGN\EDGELINE\PAVT_TAPER ON SOUTH END 6-FT.DWGFILE NAME : 10/8/2026 7:29 AMPLOT DATE :PLOT BY :DEAN STODOLA 2 PROJECT NO: PLOT NAME : 2 SHEET PLOT SCALE :1 IN:40 FT6659-02-01CTH XMARATHON6-FT LANE SHIFT (NORTHBOUND AND SOUTHBOUND)LAYOUT NAME - Plan 1 IN 40 FT Physical Recommendations : 0 860 1,720430 Feet This map is neither a legally recorded map nor a survey and is not intended to be used as one. This drawing is a compilation of records, information and data used for reference purposes only. NCWRPC is not responsible for any inaccuracies herein contained. Source: WI DNR, WisDOT, NCWRPC, Village of Weston 210 McClellan St., Suite 210, Wausau, WI 54403 715-849-5510 - staff@ncwrpc.org - www.ncwrpc.org North Central Wisconsin Regional Planning Commission Prepared By: NCWRPC Map 6A Weston Elementary Legend Weston Elementary U.S. Highway State Highway Main Roads Local Roads 15 MPH School Speed Limit (Includes Higher Fine Zone) Sidewalk Bike Lanes Recommendations Proposed Sidewalk "ÿX TOWERRIDGE PL HORIZON CT FLORLANA LN JANICE AV E JELINEK AV SCHOFIELD AV ARROW ST WESTFAIR AV STERNBERG AV SCHMUTZLER ST ACRE AVZADRA ST GORDON ST RANDYJAY ST CEDAR AV BIRCHWOOD LN LEE AV JELINEK AV RIDGE POINT CIR MESKER ST ROSE ST KNAACK AV HOLLY AV BAYINGTON AV QUIRTSANN DR WALNUT ST SCOTT ST DJ LN KENNEDY AV DEERST CARTER AV AUGUSTINE AV VON KANEL ST ABITZST BIRCH ST LEDUC ST GLAD ST WEILAND AV SUNSET STS TIMBER ST COROZALLA DR LINDA ST FOXRUN LN EAU CLAIRE AV JEAN ELLEN ST W RAYBELLE DR MOUNT VIEW AV ASPEN ST RUDOLPHDR PRAIRIE ST NORMA AV FELCH DR CAMP PHILLIPS RD CONCORD AV E RAYBELLE DR BERNARD AV ROSS AVBARCLAY WAY WESTON PINES LN WINDING RIDGE WAY S GORDON ST EDWARD ST HORIZON CT W RAYBELLE DR FLORLANA LN ROSS AV RIVERFRONT PL JEAN ELLEN ST COLLEEN AV STERNBERG AV E JELINEK AV SUNSET ST SCHOFIELD AV VON KANEL STACRE AV ZADRA ST WEILAND AV GORDON ST CEDAR AV BIRC HWO O D L N RODNEY ST LEE AVHOLLY AV S TIMBER ST KIRK ST RAEJAMES ST JELINEK AV KENNEDY AV ROSE ST KNAACK AV BAYINGTON AV N KRUEGER AV S KRUEGER AV Q UIR TSANN DR COROZALLA DR RICHFLEX ST HICKORY ST WALNUT ST DJLN DEER ST WESTFAIR AV CARTER AV ABITZ ST BIRCH ST LEDUC ST GLAD ST MESKER ST ARROW ST E BERNARD AV CRESTWOOD DR FOX RUNLN EAU CLAIRE AV MOUNT VIEW AV AUGUSTINE AV ASPEN ST RUDOLPH DR PRAIRIE ST NORMA AV FELCH DR CAMP PHILLIPS RD JANICE AV CONCORD AV LINDAST SCOTTST E RAYBELLE DR BERNARD AV Camp Phillips Rd & Ross Ave Intersection Continue painting existing high visibility crosswalks and Stop lines as is. Re-paint regular crosswalks as high visibility crosswalks, and move Stop lines for re-painted crosswalks to same distance as existing high visibility crosswalks. * * Camp Phillips Rd Paint "SCHOOL X-ING" at least 150-feet in advance of the Sternberg Ave school crosswalk. Add Higher Fines signs to School Zone signs. Install School Zone Ends and Speed Limit signs on the same post at the end of School Zone. Paint "shark teeth" yield triangles 30-feet in advance of Sternberg Ave school crosswalk; and install Yield To Pedestrians School paddle sign on road centerline at "shark teeth". * * * * Camp Phillips Rd Add a pair of double sided Rectangular Rapid Flash Beacons (RRFBs), or Pedestrian Hybrid Beacons, School Crossing signs on the north side of Sternberg Ave school crosswalk, and possibly add a pedestrian refuge island, and possibly reduce curb radii on all 4 corners. At Sternberg Ave intersection, re-paint all crosswalks and Stop lines exactly the same as the high visibility crosswalks and Stop lines at Ross Ave and Camp Phillips Rd. Install a second street light on southeast corner of Sternberg Ave & Camp Phillips Rd, facing west. * * * See Chapter 3 for all recommendations. Weston Elementary Safe Routes To School REQUEST FOR CONSIDERATION REQUEST FOR CONSIDERATION PAGES 1 OF 2 Public Mtg/Date: Public Works – 11/9/2026 Description: Intergovernmental Agreement with the Village of Rothschild and City of Schofield for construction of the WisDOT Storm Water Pond From: Michael Wodalski, PE - Director of Public Works Question: Should the Public Works Committee Recommend the Village Board Approve the Agreement with the Village of Rothschild and City of Schofield for the construction of the WisDOT Storm Water Pond? Background Rothschild, Schofield and Weston are all regulated by the Wisconsin Department of Natural Resources (WDNR) for storm water discharges within the Wisconsin River Basin. As part of our permit requirements, our communities need to reduce the amount of phosphorus entering the waters of the State. All three communities have worked with Strand Associates to model their storm water systems and have identified the Business 51 and State Highway 29 Interchange (WDOT Pond) location to be an ideal location for a storm water basin as it catches the most upstream storm water and would provide treatment prior to discharging to the Wisconsin River just to the west of the interchange. In October of 2024 our communities entered into an Intergovernmental Agreement for design of a storm water pond. After design, the next step is to move forward with construction of the pond. To date the communities have received one grant in the amount of $150,000 to be used towards the project. Additionally, the Village of Weston is in the process of submitting a Clean Water Fund Loan application to the Department of Natural Resources (DNR) to obtain a low interest loan for the project. As noted above the pond project is a requirement of the DNR’s requirements for Total Phosphorus removal within the Wisconsin River Basin. As part of the DNR process for compliance, the Village of Weston needed to submit an Implementation Plan outlining how Weston was going to meet the Phosphorus removal requirements. The first major project was this storm pond which was projected to be in service in 2026 and remove 122.4 pounds of phosphorus. Through the design phase and now with DNR concurrence, the storm water model is showing the pond will remove 225.8 pounds of phosphorus which is just over 100 pounds more than initially estimated. Based on the more detailed modeling throughout the design, the attached agreement is allocating costs based on the pounds of phosphorus being removed by the pond. This comes out to be: - 89.78% WESTON (225.8 lbs) - 8.75% ROTHSCHILD (22.0 lbs) - 1.47% SCHOFIELD (3.7 lbs) REQUEST FOR CONSIDERATION REQUEST FOR CONSIDERATION PAGES 2 OF 2 This agreement is for the construction of the pond and will supersede the existing agreement for design. Attached Docs: - Draft Agreement for Construction - Previously approved Design Agreement - Pond Description and preliminary Design - Village of Weston Implementation Plan Documents ______________________________________________________________________ Committee Action: - Committee has previously endorsed the project Fiscal Impact: - The project has a total estimated cost of ~$3,000,000 _______________ ___________________________________________________________ Recommendation: Staff recommends approving the agreement. Recommended Language for Official Action I Move to Recommend the Village Board approve the agreement with the Village of Rothschild and City of Schofield for the construction of the WisDOT Storm Water Pond. Or, Something else ____________________________________________________________________ Additional action: Page 1 of 3 INTERGOVERNMENTAL AGREEMENT BETWEEN THE VILLAGES OF ROTHSCHILD AND WESTON AND CITY OF SCHOFIELD MARATHON COUNTY, WI THIS AGREEMENT dated this _______day of _____ 2026, is by and between the VILLAGE OF ROTHSCHILD, a Wisconsin municipal corporation of Marathon County, Wisconsin (herein "ROTHSCHILD"), the VILLAGE OF WESTON, a Wisconsin municipal corporation of Marathon County, Wisconsin (herein " WESTON") and the CITY OF SCHOFIELD, a Wisconsin municipal corporation of Marathon County, Wisconsin (herein "SCHOFIELD"), collectively referred to herein as “the MUNICIPALITIES” or singularly “the MUNICIPALITY”. Recitals WHEREAS, the MUNICIPALITIES enter into this Agreement pursuant to the authority of Wis. Stat. §66.0301; WHEREAS, the MUNICIPALITIES are categorized as Municipal Separate Storm Sewer System (MS4) Communities and hold a Wisconsin Pollutant Discharge Elimination System (WPDES) Permit; and WHEREAS, the MUNICIPALITIES are located within the Wisconsin River Basin Total Maximum Daily Load (TMDL) compliance area; and WHEREAS, the MUNICIPALITIES are subject to the Total Suspended Solids (TSS) and Total Phosphorus (TP) wasteload allocations included in the Wisconsin River Basin TMDL; and WHEREAS, pursuant to Section 66.0301 of the Wisconsin Statutes, the parties hereto have agreed to an intergovernmental contract for the purpose of jointly participating in the WisDOT Right-of-Way Detention Basin Construction project by providing for a plan for project administration and oversight, the sharing of costs and expenses associated with the project and providing for a mechanism for billing and payment of project costs. NOW, THEREFORE, upon the foregoing premise and in consideration of the mutual covenants hereinafter set forth, and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the parties hereby mutually agree as follows: 1. The construction of the WisDOT Right-of-Way Detention Basin will take place by the end of th e year 202 8 as long as the MUNICIPALITIES enter into this construction agreement . The scope of the construction project consists of the Page 2 of 3 following: a. Construction and construction oversite of an approximate 2.25 Acre stormwater basin located within the Business 51/STH 29 interchange, b. Connection and redirection of any storm water conveyance pipe within the vicinity of the pond. 2. The MUNICIPALITIES have previously agreed to contract with Strand Associates for engineering design services and agree to retain Strand Associates for Construction Engineering Services for a contract price of . 3. For purposes of establishing the method of assigning costs to each community, the cost apportionment for construction is based on the calculated pounds of Total Phosphorus (TP) proportionally removed from the proposed basin and is estimated as follows: a. 89.78% WESTON (225.8 lbs) b. 8.75% ROTHSCHILD (22.0 lbs) c. 1.47% SCHOFIELD (3.7 lbs) 4. Construction will commence once an agreed upon final design as well as a cost estimate for the project is determined. 5. WESTON will fill the role of project manager to include the following duties: a. Administration of the engineering services and construction contract to include approvals of payments and accounting of all costs associated with the project. b. Submittal and administration of a Clean Water Fund Loan (CWFL) for the project. c. WESTON will invoice ROTHSCHILD and SCHOFIELD for their net share of invoices for work completed within one (1) month of receiving invoices from the Contractor and/or Engineer. ROTHSCHILD and SCHOFIELD shall pay WESTON within thirty (30) days of receipt. Any balances carried beyond 30 days shall accrue interest at the rate of five percent (5%) per month retroactive to the billing date until paid in full. Each of the parties hereto shall have full and complete access t o the other party’s records of project costs for verification purposes if needed. 6. The recitals contained in the preamble to this agreement shall be and hereby are incorporated as part of the agreement between the parties. Construction on the project will com mence no later than July 1, 202 7 and shall be completed by October 29, 2028. Each of the parties shall cooperate fully with one another and extend their respective best efforts in completing the project in an expeditious and Page 3 of 3 timely manner. 7. This agreement represents the entire agreement between the parties and shall not be amended, changed, or modified except by written agreement signed by each of the parties hereto. 8. Each party warrants and represents to each other that the execution of this Agreement by their respective officers or agents has been duly authorized and that this Agreement, when fully executed, constitutes a valid, binding and legally enforceable obligation upon the parties. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be signed as of the date and year first above written. VILLAGE OF ROTHSCHILD VILLAGE OF WESTON By: _______________________ By: ____________________________ Dan Helgeson, President Mark Maloney, President Attest: _______________________ Attest: ____________________________ Elizabeth Felkner, Clerk Pamela Brehm, Clerk CITY OF SCHOFIELD By: ____________________________________ Kregg Hoehn, Mayor Attest: _____________________________________ Lisa Quinn, Clerk/Treasurer THIS INSTRUMENT WAS DRAFTED BY: Michael Wodalski, P.E., Director of Public Works Village of Weston 4747 Camp Phillips Rd Weston, WI 54476 Village of Weston, Wisconsin Stormwater Quality Management Plan Update Section 5–Alternatives Analysis Prepared by Strand Associates, Inc. 5-5 R:\MAD\Documents\Reports\Archive\2022\Weston, WI\SQMP.1858.003.JJG.Aug\Report\S5.docx\100322 1. Dry Detention Basin to Wet Detention Basin Conversion All dry detention basins in the Village were evaluated to see whether a conversion to a wet pond is warranted. The majority of the dry ponds were shown to get a substantial TP reduction as they were modeled as grass swales per recent WDNR guidance. There were very few dry ponds with a TP reduction less than 60 percent and the ones that were, had a very low pollutant loading. Therefore, it is not recommended to pursue dry detention to wet detention basin conversion in the Village with the current inventory of dry ponds a s the cost benefit is not in the Village’s favor. 2. Inclusion of Privately-Owned BMPs As shown in Table 4.05 -2, all the privately -owned BMPs on record have a long -term maintenance agreement in place with the Village. As a result, these privately-owned BMPs were included in the Village’s Existing Conditions modeling analysis. It is recommended the Village continue to obtain long-term maintenance agreements with all private owners of BMPs so the Village can take credit for the cumulative pollutant reduction performance. 3. WisDOT Right-of-Way (ROW) Wet Detention Basin A wet detention basin is proposed to be located in the WisDOT ROW enclosed by the STH 29 entrance ramp off East Grand Avenue. This land is not currently owned by the Village; therefore, leasing the land or an easement would need to be approved to construct the pond, or an intermunicipal agreement with WisDOT, Rothschild, Schofield, and the Village to construct on WisDOT lands. The cost of leasing or purchasing the land was not included in the OPCC. The proposed pond is also near wetlands so a wetland delineation would be recommended before design. There is approximately a 1,031 -acre upstream drainage area that consists of a large mix of developed land use. Approximately 70.4 percent of the drainage area is coming from Village of Weston land (727 acres) while 27.9 percent is from the Village of Rothschild (287.3 acres) and 1.7 percent is from the City of Schofield (17.3 acres). Figure J-1 in Appendix K shows the location of the proposed wet detention basin (4H:1V side slopes were used in the preliminary layout of the pond). The cost of a clay liner is included in this alternative. It is recommended that geotechnical investigation be completed during design of wet detention basins to determine the need for and cost of a clay liner. The proposed wet pond would have a permanent wet pool of approximately 2. 3 acres. The WisDOT ROW wet detention basin provides additional treatment to 24 upstream drainage basins in R each 154 . The wet detention basin is modeled to achieve a 43.6 percent TP reduction for upstream lands draining to it. This section of Highway 51 is scheduled for reconstruction in 2025, which would be an opportunity to install a BMP here in collaboration with WisDOT. Path: S:\MAD\1800--1899\1858\003\Drawings\GIS\Figures\Alternatives\WisDOT ROW Wet Pond 11x17.mxd User: mirandah Date: 2/4/2022 Time: 2:12:00 PM FIGURE J-1 1858.003 ALTERNATIVE WISDOT ROW WET POND STORMWATER QUALITY MANAGEMENT PLAN UPDATE VILLAGE OF WESTON MARATHON COUNTY, WISCONSIN #* #* #* #* & & & & & & & & & & & & & && & !. !. !. WR-4 WR-6 (E-STH) WR-5 WR-2 WR-5.1 WR-1 (E-RIP) 1180 1182 1184 1186 1188 1190 1192 1194 1198 1196 1212 1179 11781181 1177 1200 1176 1175 1202 1174 1210 1208 1173 1206 1172 1204 1171 1170 1169 1168 1167 1165 1164 1163 1162 1166.5 1165.5 1161.5 1214 1190 1178 1184 1206 1190 1182 1180 1180 1178 1184 1188 1180 1194 1176 1172 1180 1190 1180 1180 1178 1178 1174 1180 1180 1180 1176 1186 1182 1178 1178 1192 1178 1178 1186 1184 1178 1182 1212 1178 1180 1170 1172 1178 1178 1214 1178 1178 1208 1180 1180 1178 1174 1186 1180 1208 1210 1184 1180 1210 1184 1180 1180 1180 1180 1180 1186 1188 1176 1180 1180 1182 1192 1190 1178 1182 1182 1194 1184 1186 1178 1180 1178 1210 1180 1190 1200 1210 1170 1180 1180 1180 1180 1180 1210 1190 1210 1180 1180 1190 1210 1180 1180 1180 1180 1180 1180 1180 1190 1180 1180 1180 1180 Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community, Esri, HERE, Garmin, (c) OpenStreetMap contributors !( !( 217 LW-9243 LW-18 (E-RIP) 204 LW-2 243 LW-18 (E-RIP) 114 US ECR-8C 201 US LW-1 209 LW-3 115 ECR-8D 200 LW-1 210 LW-4 212 LW-6 213 LW-7 203 LW-1B 226 LW-12 207 LW-2B (INT) 116 US ECR-8D 218 US LW-9 202 LW-1A 205 US LW-2 211 LW-5 219 LW-9A 220 LW-9B 221 LW-9C WR-4 WR-6 WR-6 EXCLUDE OF WR-4 WR154-201 ECF290-608 ECR155-309 WR154-2011 ECR155-331 WR154-210 ECR155-3095 WR154-2015 CC263-499 WR154-219 ECR155-3097 ECR155-310 WR154-213 WR154-212 WR154-2127 WR154-2014 CC263-425 WR154-2132 CC263-423 ECR155-3104 ECR155-330 ECR155-333 WR154-211 ECR155-3301 CC263-422 ECR155-3321 WR154-2133 WR154-20151 WR154-2124 WR154-209 ECF290-6089 CC263-424 CC263-420 WR154-20112 WR154-206 CC263-493 CC263-492 WR154-202 ECF290-6083 WR154-2013 CC263-419 CC263-494 ECF290-6082 ECR155-3102 CC263-421 WR154-20153 WR154-20152 ECF290-6087 WR154-2126 ECR155-3303 WR154-2121 WR154-2101 CC263-491 ECF290-6086 WR154-218 WR154-2021 WR154-2125 WR154-2091 CC263-84231 ECR155-3209 WR154-208 WR154-2131 ECR155-3094 ECR155-3302 ECR155-3311 ECR155-332 WR154-20154 ECF290-6085 ECF290-6081 CC263-426 ECF290-60714 ECR155-3304 ECF290-6081 ECR155-3106ECR155-3096 WR154-203 WR154-207 WR154-2123 ECR155-33011 ECF290-60713 ECR155-3331 WR154-2012 CC263-416 ECF290-60831 ECR155-3105 CC263-4201 WR154-2122 WR154-82134 ECF290-60712 ECR155-3107 ECF290-6084 CC263-84241 CC263-400 ECF290-60841 ECF290-6088 ECR155-3098 WR154-20161 WR154-2016 ECF290-6081 ECR155-3093 ECR155-3101 CC263-417 CC-4 WR-1 (E-RIP) CC-8 WR-11 WR-6 (E-STH) CC-2 CC-10 CC-13 WR-22 CC-12 WS-1 (E-LU & O MS4) CC-9 (E-RIP) CC-11 WR-4 WR-7 (E-RIP) WR-19 WR-10 WS-3 WS-4 WR-12 CC-3 CC-5 WR-21 WR-2 WR-14 (E-STH) CC-6 WR-9 CC-1 WR-20 WS-2 WR-8 (E-STH) CC-7 WR-5 CC-14 CC-14 WR-16 (E-STH) WR-13 Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community 0 50 10025 Feet / Legend !. Proposed Manhole Proposed Storm Sewer Storm Sewer Removal & WaterValve #* Hydrant WaterMain !. SanitaryStructures SanitaryMain Weston Basins Schofield Basins Rothschild Basins WI_Wetlands Floodplain !. Storm Manholes Storm Sewer Index Intermediate TOTAL DRAINAGE AREA=1031.0 ACRES LOCATION MAP 30 LF OF 60" RCP SLOPE: 4.9% WET POND NWL: 1166.5 2.26 ACRES STRAND SURVEY/WISDOT PLANS RIM: UNKNOWN/APPROX. 1177.00 60" W & E IE; UNKNOWN/1162.99 STRAND SURVEY/WISDOT PLANS RIM: 1170.77/APPROX. 1170.00 72" W& 60" E IE: W1163.82 E1164.87/1163.73 STRAND SURVEY/WISDOT PLANS RIM: UNKNOWN/APPROX. 1180.00 60" IE: UNKNOWN/1170.3 18" NE IE:UNKNOWN/APPROX 1172.00 STRAND SURVEY/WISDOT PLANS RIM: 1175.68/ APPROX. 1176 18" IE: UNKNOWN/APPROX. 1172.5 STRAND SURVEY/ WISDOT PLANS RIM: 1179.66/UNKNOWN 54" NE IE: 1167.60/ UNKNOWN 54" SW IE: 1167.59/ UNKNOWN STRAND SURVEY/ WISDOT PLANS RIM: 1180.14/1177.95 54" NE IE: 1167.23/1165.29 54" SW IE: 1167.18/1165.29 STRAND SURVEY/WISDOT RIM:1189.25/1189.00 60" IE: UNKNOWN/1175.55 18" ENDWALL PROPOSED MANHOLE RIM: 1174 IE: 1165.04 WET POND LOCATION 162 LF 36" RCP SLOPE: 0.4% DIVERSION MANHOLE 60" ENDWALL OUTLET STRUCTURE 36" ENDWALL 54 LF 18" RCP SLOPE: 2.0% 57 LF 60" RCP SLOPE: 2.0% PROPOSED MANHOLE RIM: 1178 IE: 1167.58 PROPOSED MANHOLE RIM: 1182 IE: 1167.64 Village of Weston, Wisconsin Stormwater Quality Management Plan Update Section 7–Conclusions and Recommendations Prepared by Strand Associates, Inc. 7-2 R:\MAD\Documents\Reports\Archive\2022\Weston, WI\SQMP.1858.003.JJG.Aug\Report\S7.doc\100322 8. Update the Village’s storm sewer system map on an annual basis. 9. Submit an annual report to WDNR documenting and tracking permit-related activities. 10. Maintain stormwater BMPs according to the Maintenanc e and Inspection of Stormwater Management Facilities document provided in Appendices G and H of the Village ’s Erosion Control and Stormwater Management Reference Guide and Policy. 11. Leverage funds from the SWU and grants for design and construction of the necessary improvements. 12. In the next stormwater quality model ing update, in clude all work completed since the WDNR approval of existing conditions modeling in 2022. Update the Village’s TP Leaf Credit Analysis to reflect changes in Village practices and any revisions made to the WDNR’s Interim Municipal Phosphorus Reduction Credi t for Leaf Management Programs guidance by that time. 7.03 IMPLEMENTATION PLAN Tables 6.04 -1 and 7.03 -1 include a breakdown of Alternative 1 for TMDL compliance (and further described in Sections 5.04 and 5.10 and Tab le 5.04 -1) includi ng the cost of each component, the implementation schedule, and applicable funding source, if applicable. This includes continuing to administer the existing stormwater program while incorporating recommendations, herein. Over time, the Village should consider other opportunities for TP reductions as they arise including consideration of components of Alternatives 1, 2, or 3 if they make sense for the Village. If the Village needs to consider additional measures to achieve TMDL compliance in the future, req uiring 80 percent TP reduction for new development could be considered. Village of Weston, Wisconsin Stormwater Quality Management Plan Update Section 7–Conclusions and Recommendations Prepared by Strand Associates, Inc. 7-3 R:\MAD\Documents\Reports\Archive\2022\Weston, WI\SQMP.1858.003.JJG.Aug\Report\S7.doc\100322 Table 7.03-1 TMDL Implementations Plan–Pounds TP 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 2047 2048 WQT 19.4 38.9 58.3 77.8 97.2 116.7 136.1 155.5 175.0 194.4 213.9 233.3 252.7 272.2 291.6 311.1 330.5 350.0 369.4 388.8 WisDOT ROW WP 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 122.4 Camp Phillips Road WP 51.7 51.7 51.7 51.7 51.7 51.7 51.7 51.7 51.7 51.7 51.7 51.7 51.7 51.7 51.7 51.7 51.7 51.7 51.7 Zinser Street and Callon Avenue WP 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 Ross Avenue and Birch Street WP 27.6 27.6 27.6 27.6 27.6 27.6 27.6 27.6 27.6 27.6 27.6 Enhanced Street Sweeping 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 8.9 TP Leaf Credit 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 11.72 Redevelopment at 40% TSS Reduction 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 Total 0.0 21.0 21.0 21.0 143.4 143.4 143.4 162.9 234.0 253.4 272.9 292.3 334.8 354.2 373.7 393.1 440.2 459.6 479.1 498.5 517.9 537.4 556.8 576.3 595.7 615.2 634.6 Cumulative Village Wide % TP Reduction 48.4% 49.1% 49.1% 49.1% 53.0% 53.0% 53.0% 53.6% 55.9% 56.5% 57.1% 57.7% 59.1% 59.7% 60.3% 60.9% 62.4% 63.1% 63.7% 64.3% 64.9% 65.5% 66.2% 66.8% 67.4% 68.0% 68.6% % Closure of TP Reduction Gap 0.0% 3.3% 3.3% 3.3% 22.6% 22.6% 22.6% 25.7% 36.9% 40.0% 43.1% 46.1% 52.8% 55.9% 59.0% 62.1% 69.5% 72.6% 75.6% 78.7% 81.8% 84.8% 87.9% 91.0% 94.0% 97.1% 100.2% Village of Weston, Wisconsin Stormwater Quality Management Plan Update Section 7–Conclusions and Recommendations Prepared by Strand Associates, Inc. 7-4 R:\MAD\Documents\Reports\Archive\2022\Weston, WI\SQMP.1858.003.JJG.Aug\Report\S7.doc\100322 7.04 PROGRAM FUNDING OPTIONS Possible funding sources fo r implementation of ac tivities required for compli ance with the sto rmwater permit are described herein. A. Grants Some of the more popular WDNR grant programs include the UNPS and Stormwater , Healthy Lakes and River s, Surf ace Water Restoration, Managemen t Plan I mplementation, Surface Water Planning, Comprehensive Manage ment Planning for Lakes and Watersheds , and Municipal Flood Control grant programs . The WDNR UNPS Grant is the most appropriate for impl ementing stormwater quality BMP s recommended in this plan. 50 percent of the design and construct ion of a stormwater qu ality BMP could be covered by the grant program should the Village be successful in obtaining a grant. Land acquisition is also fun ded through th is gran t program . The remaining percent age would b e covered b y Village funds. Scoring cri teria dictates that if the Village were to pay a higher perce ntage, then the score of t he grant application would increase, potentially increasing the od ds of grant aw ard. The C lean W ater Fund (CWF) administered thro ugh the WDN R is also a fu nding o ption w ith current funding pr oviding a 30 percent principal forgiven ess loan and a 70 percent low interest loan. The principal forgiveness loan is received thro ugh a competit ive pro cess. An I ntent to Apply (ITA) a nd Priority Evaluation Review Form ( PERF) f orm wou ld nee d to be submitte d to the WDNR. B. Fees Fees are anoth er common means of funding stormwater management improvements. Fees are charges for services rendered. Many municipalities (including the Village) recover costs of constructing, designing, reviewing, and inspecting new developments through fees assessed to developers. Impact fees and special assessments transfer the cost of infrastructure impr ovements neede d for p rivate development directly to d evelopers o r property owners. User f ees recove r co sts ov er the life of a project. An increasingly common type of u ser fee related to stor mwater management is a n SWU. Formation of stormwater utilities enab les municipalities t o r ecover costs of stormwater ma nagement improvements based on the amount of stormwater “generated” by a land use. The Village has a SWU. The Village may want to use modified SWU rates to assist in funding the implementation of this plan. C. Bonds Large capital improvement projects such as major storm sewers or det ention facilities may be funded through bonds or grants. Bon ds are a mecha nism to b orrow capital for a project and distribute repayment over the life span of the project. A po pular local bonding p rogram is the Clean Water Fund Program ( CWFP). This is one of the subsidi zed loan progr ams in cluded in WDNR’s Environmental Improvement Fund ( EIF). The CW F provi des loans to municipalities for wast ewater treatment and urban stormwater projects. This progra m has historically been use d extensively for WWTP construction. Recent prog ram modifications allow f unds to be used for storm water ma nagement improvements. Village of Weston, Wisconsin Stormwater Quality Management Plan Update Section 7–Conclusions and Recommendations Prepared by Strand Associates, Inc. 7-5 R:\MAD\Documents\Reports\Archive\2022\Weston, WI\SQMP.1858.003.JJG.Aug\Report\S7.doc\100322 Most CWF projects receive a subsidized i nterest rate of 55 percent, 65 percent, or 70 percent of th e EIF market interest rate. CWF wastewater projects that meet certain criteria may be eligibl e to receive Hardship Financial Assistance, which may be in the form of a lower interest rate loan or include a grant. 7.05 POLICIES AND PRACTICES A. General As in a ny typ ical community, localized drainage issues commonl y arise that m ay affect a limite d number of areas. These issues may be c aused by a deficiency in a d rainage facility, a maintenance issue, or alterations of property during maintenance or construction projects. It is recom mended the Village develop a uniform policy for addressing localized drainage issues and maintain a rec ord of wher e these issues have occurred. This policy should e stablish the procedure to be followed in resolving future draina ge issues in the Village. This will ensure that future i ssues are addressed in an equitable and timely manner and locations of recurring problem areas can be identified for future planning purposes. B. Recommended Policy This section includes a recommended policy for addressing drainage issues which should be reviewed by the Village and, if appropriate, adopted as a formal policy. 1. Problem Identification and Drainage Evaluation a. After receiving a verbal or written complaint from a resident, the resi dent should be provided a Drai nage Evaluat ion Form (Appendix N). The reside nt should complete Parts A, B, and C of the form and return it to the Village. b. Within 30 calendar days of receivi ng the form with completed Parts A, B, and C, a Village representative will inspect the location and revie w the informat ion submitted by the resident. The Village representative will complete Part D of the form based upon this review. c. The Village representative will make a recommendation in Part E of the form regarding ac tion to be taken (if any) to allevi ate or mitigat e the problem. Decision-making criteria will be clearly stated. d. A copy of the comp leted D rainage Evaluation Form will be returned to the resident. Additional copies will be maintained by the Village and the form and complaint loca tion will be i ncorporated into the Village’s Geographical Information System database for future an alysis of drainage problem area trends. Village of Weston, Wisconsin Stormwater Quality Management Plan Update Section 7–Conclusions and Recommendations Prepared by Strand Associates, Inc. 7-6 R:\MAD\Documents\Reports\Archive\2022\Weston, WI\SQMP.1858.003.JJG.Aug\Report\S7.doc\100322 2. Village Authority The Village authority in addressing individual drainage iss ues should be determin ed on a case-by-case basis. Before the Village takes corrective action, the ownersh ip of the p roperties causing the problem and be ing damaged should be verified. Where the Village has easement rights and the issue involves the obstruc tion of a natural wate rcourse (under Section 88.90 of the WAC), the Village can move to correct the probl em. If the drainage issue re sults from an activity that is not located on a Village property or ROW, does not violate a Village ordinance, or does not involve obstruction of a natural watercourse, the Village may be without ju risdiction to act. 3. Determination of Village Responsibility In cases where it is d etermined, the Village can take corrective a ction to address the drainage deficiency, the following steps should be taken: a. Alternative solutions to the identified pro blem should be developed a nd incorporated into the Village stormwater management plan. b. Opinions of probable engineering and construction costs of individual projects should be prepared. c. As part of the annua l bu dget process, projects to be construct ed each year should be selected based upon priority ranking and funding availability. 7.06 CONCLUSION The purpose of this plan has been to provide the Village with a WPDES permit-compliant SQMP. The Village should use this report to guide its stormwa ter permit compliance eff orts. Funding of the stormwater pr ogram is a t the discretion of t he Village. At this time, it appears that the most economical way to i mplemen t a stormwater program is to leverage SWU funds in addition to applying for WDNR UNPS and SW grants and other ap plicable grants for th e recommended alternativ e stormwater BMP component s r equired to close the TP reduction gap and maintain pe rmit co mpliance. REQUEST FOR CONSIDERATION REQUEST FOR CONSIDERATION PAGES 1 OF 2 Public Mtg/Date: Public Works Committee – 11/9/2026 Description: Intergovernmental Agreement with the Town of Weston for the reconstruction of Ross Ave from River Bend Rd/Powers St to Pauls Ave From: Michael Wodalski, PE - Director of Public Works Question: Should the Public Works Committee Recommend approving an Intergovernmental Agreement with the Town of Weston for the reconstruction of Ross Ave from River Bend Rd/Powers St to Pauls Ave? Background Since 2019, the Village and Town have been working together on the reconstruction of Ross Ave from River Bend Rd to Pauls Ave. In 2023 the two communities submitted a Wisconsin Department of Transportation (WisDOT) Surface Transportation Program – Urban (STP-U) grant and successfully obtained a grant to reconstruct Ross Ave from River Bend Rd to Pauls Ave for a grant amount of $2,211,598. The grant is intended to fund 75% of the project costs with the remaining costs then split between the Village and Town of Weston. The attached Intergovernmental Agreement lays out the proportionate share of costs for the project to each community and also goes through how water and sewer costs will be the responsibility of the Village. We also discuss the possibility of future annexations and how those costs would be handled if land currently in the Town is annexed into the Village before the Town’s debt payments are fully paid. Based on the WisDOT agreement for the project, this project is currently programmed for reconstruction in 2028. Staff recommends moving forward with the Intergovernmental Agreement Attached Docs: Draft Agreement and Project Estimate ______________________________________________________________________ Committee Action: Project was previously endorsed and engineering contract with Becher Hoppe has been approved. Fiscal Impact: Villages estimated cost are shown on the attached estimate. Overall Village cost is around $2.96 Million of which $2.2 Million is estimated as utility costs and the remainder general fund costs _______________ ___________________________________________________________ Recommendation: Staff recommendation is to approve the Intergovernmental Agreement with the Town of Weston for the reconstruction of Ross Ave from River Bend Rd to Pauls Ave. REQUEST FOR CONSIDERATION REQUEST FOR CONSIDERATION PAGES 2 OF 2 Recommended Language for Official Action I Move to Recommend the Village Board approve the Intergovernmental Agreement with the Town of Weston for the reconstruction of Ross Ave from River Bend Rd to Pauls Ave. Or, Something else _____________________________________________________________________ Additional action: Page 1 of 4 INTERGOVERNMENTAL AGREEMENT THIS AGREEMENT dated this _______day of ______ 202_, is by and between the VILLAGE OF WESTON, a Wisconsin municipal corporation of Marathon County, Wisconsin (herein " VILLAGE") and the TOWN OF WESTON, a Wisconsin municipal corporation of Marathon County, Wisconsin (herein " TOWN"), (collectively referred to herein as “the Municipalities” or singularly “the Municipality”). WHEREAS, Ross Avenue from River Bend Road east approximately 0.1 miles is a sixty- six (66) foot wide right -of-way (ROW), the entire ROW is located in the VILLAGE, from 0.1 miles east of River Bend Rd, for 0.12 miles to Kramer Ln there is a sixty-six (66) foot wide ROW, the northern 33 feet of which is located in the TOWN and the southern 33 feet of which is located in the VILLAGE , for 0.13 miles to Kramer Ln there is a sixty -six (66) foot wide ROW of which all ROW is located in the VILLAGE, and then for 0.25 miles to Kramer Ln there is a sixty-six (66) foot ROW of which the northern 33 feet is located in TOWN and the southern 33 f eet is located in VILLAGE . North from the Kramer Ln and Ross Avenue intersection for 0.25 miles, a sixty-six (66) foot wide ROW exists entirely in the TOWN. For 0.25 miles north of Quentin St to Paul’s Ave, a sixty -six (66) foot wide ROW exists with the western 33 feet located in the VILLAGE and the eastern 33 feet in the TOWN; and WHEREAS, that part of Ross Avenue described above is in need of reconstruction, including the installation of storm sewer and/or culverts, street reconstruction including installation of driveway approaches, and off pavement bicycle and pedestrian accommodations with landscaping and restoration; and WHEREAS, pursuant to Section 66.0301 of the Wisconsin Statutes, the Municipalities hereto have agreed to an intergovernmental contract for the purpose of jointly participating in the Ross Avenue reconstruction project by providing for a plan for project administration and oversight, the furnishing of labor and equipment, the sharing of costs and expenses associated with the project and providing for a mechanism for billing and payment of project costs; and WHEREAS, the Municipalities partnered in applying for the Wisconsin Department of Transportation (WisDOT) Surface Transportation Program – Urban (STP-U) grant for the 2024-2029 award cycle; and WHEREAS, a State Municipal Agreement with the WisDOT was signed between the VILLAGE and State in August 2024. The agreement allocates $2,211,598 in federal funding for the joint Ross Ave Project. This project has Project ID of 6999- 13-04 and is scheduled for construction in State Fiscal Year 2028. Page 2 of 4 NOW, THEREFORE, upon the foregoing premise and in consideration of the mutual covenants hereinafter set forth, and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the parties hereby mutually agree as follows: 1. The reconstruction of Ross Avenue from River Bend Rd on the west end to Paul’s Ave on the north is planned to take place in the year 202 8. The scope of the project is currently assumed to be the following: a. A 30-foot wide asphalt pavement with 11-foot drive lanes and a 4-foot paved shoulder, b. Four inches of asphalt pavement, c. Roundabout at the intersection of Ross Ave and Kramer Ln, d. A 10 -foot multi -use path adjacent to Ross Ave with 2 inches of asphalt pavement, e. Storm sewer, culverts or ditching to drain the street and the surrounding area draining to or through the street. f. The VILLAGE will be extending sanitary sewer and water mains as part of the project to benefit property within the VILLAGE. The TOWN and VILLAGE agree to work cooperatively as to the method of cost recovery for sanitary sewer and water mains which benefit property within the TOWN. Cost recovery by the VILLAGE for property within the TOWN may require an annexation agreement(s), special assessment agreements , development agreements, or other legally binding documents which allow the VILLAGE to recover its assessable costs. 2. An estimate of the project construction costs, titled "Estimated Costs for Street Reconstruction “Preliminary,” reflecting the proposed apportionment of the costs to the VILLAGE and TOWN is attached hereto and made a part hereof as if fully set forth herein at length and marked Exhibit "A ". The preliminary construction cost estimate less the water and sewer utility infrastructure is $2,183,364.86 with the estimated responsibility being $1,075,858.22 for TOWN and $1,107,506.65 for VILLAGE. For purposes of establishing the method of assigning costs to each community, the construction cost apportionment is estimated as follows: a. Street construction costs for the Ross Avenue main line will be split 50.7% to VILLAGE and 49.3% to TOW N. If property abutting the street right -of- way should be added or detached from either governmental unit’s jurisdiction after the date of this agreement and prior to project completion, the cost split for local matching funding shall be adjusted to reflect apportionment of total costs on the basis of street frontage within each governmental unit. Page 3 of 4 i. If there are annexations from TOWN to VILLAGE after construction, and the TOWN is still paying off debt proceeds, the VILLAGE will reimburse the TOWN for the proportionate share of any debt payment related to the portion of roadway no longer within the TOWN’s jurisdiction. b. Driveway transition and paving costs will be apportioned to the community in which the benefitting property is located. c. Storm sewer/drainage costs will be apportioned at the same ratio of Street costs. d. Sanitary Sewer and Water Utility costs will be 100% the responsibility of the VILLAGE. 3. The breakdown of detailed costs will also be used to determine the apportionment of administration, overhead, engineering and other project delivery costs o n the project. The preliminary estimate of Engineering Design is $345,750.00 with the apportionment of responsibility being determined as described in Item 2, above. Construction Engineering costs based on the requirements in the STP -U application were estimated by WisDOT to be $514,935 and will be apportioned as described in Item 2, above. 4. The municipalities will be receiving grant funds through the Wisconsin Department of Transportation’s STP- U Program. Those funds total $2,211,598 and will be used first to pay for the Participating Costs (Street and Drainage). The remainder of the costs known as the Local Share will then be each Municipalities expense on the basis of the proportionate costs of construction, excluding sanitary sewer and water improvements. a. Based on Project Costs, Grant funds will be split proportionally with the TOWN receiving $1,090,317.81 and the VILLAGE receiving $1,121,280.19. b. The Net Project Costs are estimated to be $325,713.35 for the TOWN and $2,963,849.22 for the VILLAGE 5. VILLAGE will fill the role of project manager to include the following duties: a. Selection and hiring of an engineer to perform design and bidding services for the project. b. Advertising for bids, in accordance with Section 66.0901 of the Wisconsin Statutes, and execution of a contract for the subject public works improvements. c. Administration of the public works contract to include approvals of payments Page 4 of 4 and accounting of all costs associated with the project d. Selection and hiring of an engineer to perform construction inspection, oversight of the contract, and preparation of record drawings for the subject public works improvements. 6. Each party to this agreement shall be responsible for conducting its own special assessment process for the project, if applicable. 7. The recitals contained in the preamble to this agreement shall be and hereby are incorporated as part of the agreement between the parties. Construction on the project is based on WisDOT grant funding and is expected to be a 202 8 year construction. Each of the parties shall cooperate fully with one another and extend their respective best efforts in completing the project in an expeditious and timely manner. 8. This agreement represents the entire agreement between the parties and shall not be amended, changed, or modified except by written agreement signed by each of the parties hereto. 9. Each party warrants and represents to each other that the execution of this Agreement by their respective officers or agents has been duly authorized and that this Agreement, when fully executed, constitutes a valid, binding and legally enforceable obligation upon the parties. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be signed as of the date and year first above written. VILLAGE OF WESTON TOWN OF WESTON By: _______________________ By: ____________________________ Mark Maloney, its President Dave Phelps, its Chairman Attest: _______________________ Attest: ____________________________ Pamela Brehm, its Clerk Robin Huempfner, its Clerk/Treasurer THIS INSTRUMENT WAS DRAFTED BY: Michael Wodalski, P.E., Director of Public Works and Utilities Village of Weston 4747 Camp Phillips Rd Weston, WI 54476 11/4/2026 Item Estimated Unit Number Item Description Units Quantity Price 100 Sanitary Sewer 104 PVC Sanitary Sewer, 8 inch L.F. 3300.00 $75.00 $247,500.00 - $0.00 3,300.00 $247,500.00 105 PVC Sanitary Sewer, 10 inch L.F. 4625.00 $90.00 $416,250.00 - $0.00 4,625.00 $416,250.00 106 Sanitary Manhole, 48 inch EA. 20.00 $7,500.00 $150,000.00 - $0.00 20.00 $150,000.00 107 Manhole Frame and Cover (R1550A(1040)-5080) EA. 20.00 $825.00 $16,500.00 - $0.00 20.00 $16,500.00 108 PVC Wye, 8 inch x 4 inch EA. 16.00 $175.00 $2,800.00 - $0.00 16.00 $2,800.00 109 PVC Wye, 8 inch x 6 inch EA. $175.00 $0.00 - $0.00 0.00 $0.00 110 PVC Wye, 10 inch x 6 inch EA. 2.00 $175.00 $350.00 - $0.00 2.00 $350.00 111 Sanitary Sewer Lateral, 6 inch EA. $90.00 $0.00 - $0.00 0.00 $0.00 112 Sanitary Sewer Lateral, 4 inch L.F. 720.00 $85.00 $61,200.00 - $0.00 720.00 $61,200.00 113 Lateral Connection & Adjustment EA. 18.00 $250.00 $4,500.00 - $0.00 18.00 $4,500.00 114 Mobilization - Sanitary LS 1.00 $25,000.00 $25,000.00 - $0.00 1.00 $25,000.00 115 Television Inspection LF 7925.00 $2.00 $15,850.00 - $0.00 7,925.00 $15,850.00 Sanitary Sewer Subtotal $939,950.00 $0.00 $939,950.00 200 Water 202 Hydrant, Waterous 8' Bury - Yellow EA. 11.00 $8,500.00 $93,500.00 - $0.00 11.00 $93,500.00 207 Mobilization - Water LS 1.00 $25,000.00 $25,000.00 - $0.00 1.00 $25,000.00 208 Connect to Existing (8-inch) EA. 1.00 $2,000.00 $2,000.00 - $0.00 1.00 $2,000.00 209 Connect to Existing (12-inch) EA. 1.00 $3,500.00 $3,500.00 - $0.00 1.00 $3,500.00 210 Ductile Iron Watermain, 6 inch - Thickness Class 50 L.F. 440.00 $70.00 $30,800.00 - $0.00 440.00 $30,800.00 211 Ductile Iron Watermain, 8 inch - Thickness Class 50 L.F. $90.00 $0.00 - $0.00 0.00 $0.00 212 Ductile Iron Watermain, 12 inch L.F. 5950.00 $100.00 $595,000.00 - $0.00 5,950.00 $595,000.00 213 Gate Valve, 6 inch EA. 11.00 $2,500.00 $27,500.00 $0.00 11.00 $27,500.00 214 Gate Valve, 8 inch EA. $3,000.00 $0.00 - $0.00 0.00 $0.00 215 Gate Valve, 12 inch EA. 13.00 $4,500.00 $58,500.00 - $0.00 13.00 $58,500.00 216 Ductile Iron Tee, 10 X 10 x 8 EA. $645.00 $0.00 - $0.00 0.00 $0.00 217 Ductile Iron Tee, 12 X 12 x 6 EA. 11.00 $1,000.00 $11,000.00 - $0.00 11.00 $11,000.00 218 Ductile Iron Tee, 12 X 12 x 12 EA. 3.00 $1,250.00 $3,750.00 - $0.00 3.00 $3,750.00 221 12" Ductile Iron Fittings EA. 24.00 $2,120.00 $50,880.00 - $0.00 24.00 $50,880.00 222 Rigid Insulation Board, 4-Inch S.F. $2.50 $0.00 - $0.00 0.00 $0.00 223 Plug (12") EA. 2.00 $1,000.00 $2,000.00 - $0.00 2.00 $2,000.00 224 Plug (8") EA. $115.00 $0.00 - $0.00 0.00 $0.00 225 Water service Group, 1 inch EA. 18.00 $2,500.00 $45,000.00 - $0.00 18.00 $45,000.00 226 Copper Water Service, 1 inch L.F. 720.00 $75.00 $54,000.00 - $0.00 720.00 $54,000.00 Water Subtotal $1,002,430.00 $0.00 $1,002,430.00 300 Storm Sewer 301 Culvert Pipe LF 300.00 $200.00 $60,000.00 147.83 $29,565.14 152.17 $30,434.86 Storm Sewer Total $60,000.00 $29,565.14 $30,434.86 Total Project Cost Quantity Cost Quantity Cost EXHIBIT A Estimated Costs for Street Reconstruction "PRELIMINARY" Ross Ave (River Bend to Pauls) 30 foot pavement, 4" thick Total Project Cost TOWN Costs VILLAGE Costs 261104 Ross ave estimate revised 11/4/2026 Item Estimated Unit Number Item Description Units Quantity Price Total Project Cost Quantity Cost Quantity Cost EXHIBIT A Estimated Costs for Street Reconstruction "PRELIMINARY" Ross Ave (River Bend to Pauls) 30 foot pavement, 4" thick Total Project Cost TOWN Costs VILLAGE Costs 400 Street Reconstruction 401 Remove Existing Pavement SY 15,386.67 $5.00 $76,933.33 7,581.82 $37,909.08 7,804.85 $39,024.25 402 Mobilization - Streets LS 1.00 $25,000.00 $25,000.00 0.49 $12,318.81 0.51 $12,681.19 403 Crushed Aggregate Base Course CY 6,444.44 $25.00 $161,111.11 3,175.52 $79,387.88 3,268.93 $81,723.23 404 Asphalt Pavement Binder TN 2,900.00 $85.00 $246,500.00 1,428.98 $121,463.46 1,471.02 $125,036.54 405 Asphalt Pavement Surface TN 1,740.00 $85.00 $147,900.00 857.39 $72,878.08 882.61 $75,021.92 406 Shoulders SY - $13.00 $0.00 - $0.00 0.00 $0.00 407 Pavement Marking LF 23,080.00 $2.00 $46,160.00 11,372.72 $22,745.45 11,707.28 $23,414.55 408 Traffic Control LS 1.00 $15,000.00 $15,000.00 0.49 $7,391.29 0.51 $7,608.71 409 Permanent Signs EA. 10.00 $200.00 $2,000.00 4.93 $985.50 5.07 $1,014.50 410 ROUNDABOUT LS 1.00 $600,000.00 $600,000.00 0.49 $295,651.42 0.51 $304,348.58 Street Reconstruction Subtotal $1,320,604.44 $650,730.97 $669,873.47 500 Curb and Gutter 502 24" Concrete Shoulder L.F. 11,540.00 $18.00 $207,720.00 5,686.36 $102,354.52 5,853.64 $105,365.48 505 Crushed Aggregate Base Course CY 854.81 $25.00 $21,370.37 421.21 $10,530.30 433.60 $10,840.07 Curb and Gutter Subtotal $229,090.37 $112,884.82 $116,205.55 600 Sidewalk and Driveways 601 Asphalt Multi-Use Path, 10-foot SY 6,411.11 $13.00 $83,344.44 3,159.09 $41,068.17 3,252.02 $42,276.27 602 Crushed Agg Base Course, 8 Inch CY 1,709.63 $30.00 $51,288.89 842.42 $25,272.72 867.21 $26,016.17 Sidewalk and Driveways Subtotal $134,633.33 $66,340.89 $68,292.44 700 Landscaping and Mobilization 701 Topsoil, Seed, Fertilizer & Mulch SY 19,233.33 $7.50 $144,250.00 9,477.27 $71,079.53 9,756.06 $73,170.47 703 Silt Fence LS 1.00 $10,000.00 $10,000.00 0.49 $4,927.52 0.51 $5,072.48 Landscaping and Mobilization Subtotal $154,250.00 $76,007.05 $78,242.95 Street and Drainage Subtotal 1,898,578.14 $ 935,528.89$ 963,049.26$ Street/Drainage Contingency (15%) 284,786.72 $ 140,329.33 $ 144,457.39 $ Total Participating (Street/Drainage) Cost 2,183,364.86 $ 1,075,858.22 $ 1,107,506.65 $ Water and Sewer Utility Subtotal 1,942,380.00 $ - $ $1,942,380.00 Water/Sewer Contingency (15%) 291,357.00 $ - $ 291,357.00 $ Total Non Participating (Water/Sewer) Cost 2,233,737.00 $ - $ $2,233,737.00 Design Engineering Costs 345,750.00 $ 86,437.50 $ 259,312.50 $ Construction Engineering Costs (from STP Application) 514,935.00 $ 253,735.44 $ 484,573.26 $ Total Project Costs 4,932,036.86 $ 1,416,031.16 $ 4,085,129.41 $ Grant Funds (Split 50.7% Village/49.3% Town) Per ROW Frontage 2,211,598.00$ 1,090,317.81 $ 1,121,280.19 $ Net Project Costs with Grant Funds 2,720,438.86 $ $325,713.35 2,963,849.22 $ TOWN Costs VILLAGE Costs 261104 Ross ave estimate revised March 13, 2024 Jordan Kelbley Planning Supervisor WisDOT NC Region 1681 Second Ave. South Wisconsin Rapids, WI 54495 -4768 WAUSAU MPO NEW ALLOCATION OF SURFACE TRANSPORTATION BLOCK GRANT (STP-URBAN) FUNDS FOR 2025-2029 At their March 12, 2024 meeting, the Marathon County Metropolitan Planning Commission (Wausau MPO) reviewed the funding for the ranked projects submitted for the Surface Transportation Block Grant (STBG) funds assigned to the Wausau Group. The Commission allocated funds based on new estimates of the available funds presented by WisDOT. This new amount reflected a larger amount of $4,563,598 for years 2025-2029. The Planning Commission reviewed its top project applications within the MPO area with the number one ranked project now to be awarded funds based on a 75% federal share and a 25% local share, with the second ranked project receiving the remaining Federal funds for a 70%/30% federal /local split . The projects are ranked as: #1 – Ross Avenue from River Bend Road to Paul’s Avenue in the Village of Weston and Town of Weston. This project was identified to receive $2,211,598 of the allocation. #2 – Camp Phillips Road (County Road X) and Ross Avenue intersection. This project wa s identified to receive $2,352,000 of the allocation. The communities understand that the STBG funds available for this period will be capped at the amounts set and will be defined and identified in the project agreement with the WisDOT. If you need any additional information or have comments, please let me know. David Mack Wausau MPO Director Cc Dave Meurett - WisDOT Evan Maves - WisDOT James Griesbach – Marathon County Michael Wodalski – Village of Weston Milt Olson – Town of Weston

Source: Village of Weston website. First collected Nov 9, 2026.